dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Majandus- ja Kommunikatsiooniministeerium
Väljaminev kiriAvalik

Kiri

Majandus- ja Kommunikatsiooniministeerium · 29. detsember 2022
Viit
25-4/22-15-1
Registreeritud
29. detsember 2022
Dokumendi liik
Väljaminev kiri
Adressaat
Keskkonnaamet, RB Rail AS Eesti filiaal
Saabumis/saatmisviis
e-post, DVK
Funktsioon
25 Transpordi arengu korraldamine
Sari
25-4 Raudteetransporditaristu arendamise projektide toimikud
Toimik
25-4/2022
Vastutaja
Andres Lindemann (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Transpordi valdkond)

Failid

  • 📎25-422-15-1 29.12.2022 Väljaminev kiri.asice545 KB

Sisu (failidest)

EU Grants: Environmental Compliance File (CEF-T and CEF-E): V1.0 – 01.09.2021 DECLARATION BY THE COMPETENT AUTHORITY FOR MONITORING NATURA 2000 SITES (To be filled in and signed by the competent Member State authority and uploaded as part of the application — merged into one file together with the environmental compliance questionnaire and the other declaration(s).) COMPETENT AUTHORITY Competent authority: Environmental Board Department: Contact person: Kadri Hänni, Leading Specialist Department of Nature Use Legal address: Keskkonnaamet Roheline tn 64, 80010 Pärnu [email protected] COMPLIANCE DECLARATION Rail Baltica - 1435 mm standard gauge railway line development in Estonia, Latvia and Lithuania (Part VIII) CEF-T-2022-CORECOEN; RBGP Part VIII C (Proposal ID: Name of the project: SEP-210911001) CEF-T-2022-COREGEN; RBGP Part VIII G (Proposal ID: SEP- 210911000) Location: Estonia, Harju County, Rapla County. We hereby confirm that: 1) the project is not likely to have significant effects on a Natura 2000 site and therefore an appropriate assessment as described by Article 6(3) of Directive 92/43/EEC was YES not considered necessary 2) a map at scale of 1:100.000 (or the nearest possible scale) is attached, indicating the YES location of the project as well as the Natura 2000 sites concerned, if any Additional comments Please state the reasons for your decision. Please include the name of the site, reference number, the distance of the project to the nearest Natura 2000 site(s), and justification that the project (either individually or in combination with other projects) is not likely to have significant negative effects on Natura 2000 site(s) (or site(s) intended to be included in the Natura 2000 network). In case of designated sites, refer to the analysis (screening) carried out in view of the site-specific conservation objectives. Attach, if relevant, the administrative decision. The Strategic Environmental Impact Assessment (SEA) was carried out following the national regulatory requirements and EU Directives 2009/147/EC and 92/43/EEC. EU Grants: Environmental Compliance File (CEF-T and CEF-E): V1.0 – 01.09.2021 The Ministry of Environment as the supervisor of SEA has approved the SEA report on 09.08.2017. The approved SEA was a prerequisite to Harju 1, Rapla2 and Pärnu3 county spatial plans forming the development consent for Rail Baltic on Estonian territory. The county spatial plans were adopted with decisions of the minister of public administration from February 12 th and 13th 2018. During SEA it was assessed what direct and indirect impacts the construction of Rail Baltica and its related infrastructure in Estonia will have on the environment, including on specially protected territories designated for the protection of species and habitats under EU Directive 92/43/EEC on the conservation of natural habitats and of wild fauna and flora (sites of Natura 2000 network). According to the approved SEA report the Rail Baltic project is not likely to have negative impact to Natura 2000 sites. *DS1.DPS2 - Construction of substructure and associated elements on the main line 0+000 – 7+200 – Phase 1 The closest Natura 2000 site to the Estonian Rail Baltica main line construction activity “Construction of substructure and associated elements on the main line 0+000 – 7+200 – Phase 1”, is Rabivere natural area (EE0020316) that is situated ~10m from the construction boundary. For this section an environmental impact assessment (EIA “Harju ja Rapla maakonnapiir kuni Hagudini”) has been carried out and approved (approved 05.09.2022). During the EIA process an appropriate Natura 2000 assessment was carried out. The result of the Natura 2000 assessment was that there is no impact on the integrity of the natural area. There are no adverse impacts on the habitat types and species that are conservation objectives due to the proposed activity. For the other construction activities, that are included in the CEF Cohesion and General calls of the Rail Baltica Project, the closest Natura 2000 sites are situated around 1km or greater distance. According to SEA and EIA results and their analysis of impacts, the activities that are included in the CEF Cohesion and Generall calls of the Rail Baltica Project in Estonia do not have negative impact on these Natura 2000 sites. Therefore, an appropriate assessment as described by Article 6(3) of EU Directive 92/43/EEC for these other activities that are included in the CEF Cohesion and Generall calls of Rail Baltica Project in Estonia, was not deemed necessary. Signature of the authorised person Name and function: Rainer Vakra, Director General Date of signature: [date] 1 https://maakonnaplaneering.ee/documents/2845826/18665655/Harju+maakonnaplaneeringu+%E2%80%9ERail+Baltic+ra udtee+trassi+koridori+asukoha+m%C3%A4%C3%A4ramine%E2%80%9C%20kehtestamine.pdf/573f806a-723f-4ed8- 831e-5dedb8ecb670 2 https://maakonnaplaneering.ee/documents/2845826/18665653/Rapla+maakonnaplaneeringu+%E2%80%9ERail+Baltic+r audtee+trassi+koridori+asukoha+m%C3%A4%C3%A4ramine%E2%80%9C%20kehtestamine.pdf/24c262e0-6b7e-4233- 8cd5-f9f330d855bd 3 https://maakonnaplaneering.ee/documents/2845826/18665657/P%C3%A4rnu+maakonnaplaneeringu+%E2%80%9ERail+ Baltic+raudtee+trassi+koridori+asukoha+m%C3%A4%C3%A4ramine%E2%80%9C%20kehtestamine.pdf/b369b855-d433- 4bd0-be51-1f840c3f6f14 EU Grants: Environmental Compliance File (CEF-T and CEF-E): V1.0 – 01.09.2021 Signature and stamp: [signature and stamp] Rainer Vakra Meie 29.12.2022 nr 25-4/22-15-1 Keskkonnaamet [email protected] Narva mnt 7a 15172 Tallinn, Eesti Rail Baltica CEF rahastustaotluse keskkonnalisad Austatud Rainer Vakra Majandus- ja Kommunikatsiooniministeerium (MKM) koos kolme Balti riigi ühisettevõttega RB Rail AS on esitamas järjekordset rahastustaotlust Rail Balticu projekti tegevuste finantseerimiseks Euroopa Ühendamise Rahastust (CEF). Taotluse lisana vajame pädeva asutuse kinnitust Natura 2000 rakendamise osas. Käesolevaga saadame allkirjastamist vajava vormi (käesoleva kirja lisa), taotlusega esitatavate tegevuste kirjeldused on Keskkonnaametile varasemalt edastanud Rail Baltic Estonia OÜ. Palume Keskkonnaametil saata allkirjastatud (koos templiga) toetuskirjad skaneerituna tagasi meile hiljemalt 8. jaanuaril 2023. Vabandame lühikese tähtaja pärast. Lugupidamisega (allkirjastatud digitaalselt) Indrek Gailan transpordi asekantsleri ülesannetes Lisad: Natura_2000_declaration_EE_2022.docx Lisaadressaadid: RB Rail AS Eesti filiaal Andres Lindemann 5844 6406 [email protected] Suur-Ameerika 1 / 10122 Tallinn / 625 6342 / [email protected] / www.mkm.ee Registrikood 70003158
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel