dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Rahandusministeerium
Sissetulev kiriAvalik

Letter

Rahandusministeerium · 7. november 2023
Viit
9.2-6.1/6761
Registreeritud
7. november 2023
Dokumendi liik
Sissetulev kiri
Adressaat
European Commission
Saabumis/saatmisviis
e-post
Funktsioon
9.2 VÄLISABI JA EUROOPA LIIDU TOETUSTE PROGRAMMIDE KORRALDAMINE
Sari
9.2-6.1 Taasterahastu (RRF) planeerimine ja rakendamine
Toimik
9.2-6.1
Vastutaja
Triin Tomingas (Rahandusministeerium, Kantsleri vastutusvaldkond, Eelarvepoliitika valdkond, Riigieelarve osakond, Välisvahendite talitus)

Failid

  • 📎OA_EN_annexe_acte_autonome_cp_part1_v2.pdf1231 KB

Sisu (failidest)

1 2 ANNEX II Recovery and Resilience Facility First modification to the Operational arrangements between the European Commission and Estonia [The modification to the Operational Arrangements shall enter into force on the date of receipt of the European Commission’s agreement in writing.] This modification to the Operational Arrangements is made by and between the European Union, represented by the European Commission, hereinafter referred to as “the Commission” and Estonia, represented by the Minister of Finance, Hereinafter referred to as “the Member State”, hereinafter jointly referred to as the “Parties” and each of them a “Party” The Parties have agreed the following: Operational Arrangements of 22 March 2022 between the European Commission and Estonia are modified as follows: (1) Recital 2 is replaced by the following: 3 In accordance with Article 18(1) of the RRF Regulation, Estonia submitted to the Commission a recovery and resilience plan (the “RRP”). By virtue of Council Implementing Decision of 16 June 2023 on the approval of the assessment of the recovery and resilience plan for Estonia (ST 9367/23 INIT; ST 9367/23 ADD 1), (the “Council Implementing Decision”) the Council approved the assessment of the RRP and determined a financial contribution of EUR 953 184 800 linked to the satisfactory fulfilment of milestones and targets (2) In Section 3: Timeline for payment requests (a) The table for Financial Contribution is replaced by the following: Financial Contribution Expected date of submission of Amount payment request (quarter and year) Payment request for the First EUR 142 977 720 Q2 2023 Instalment Payment request for the EUR 142 977 720 Q2 2023 Second Instalment Payment request for the EUR 142 977 720 Q4 2023 Third Instalment Payment request for the EUR 142 977 720 Q4 2024 Fourth Instalment Payment request for the Fifth EUR 142 977 720 Q3 2025 Instalment Payment request for the Sixth EUR 142 977 720 Q2 2026 Instalment Payment request for the EUR 95 318 480 Q3 2026 Seventh Instalment (3) “Annex I: Milestones, Targets and Related Indicators” is replaced by the following Annex I. (4) “Annex II: Arrangements and Timetable for Monitoring” is replaced by the following Annex II. 4 Annex I Milestones, Targets and Related Indicators Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Summary document duly justifying A call for proposals to support the digital how the milestone (including all the transformation of businesses, together with the constitutive elements) was award criteria, shall be published by the Ministry satisfactorily fulfilled. of Economic Affairs and Communications. This document shall include as an The evaluation criteria and the conditions for annex a copy of the publication of granting support shall be defined on the basis of the call for proposals demonstrating an analysis of the needs of Estonian companies alignment with the requirements of and the expected impact of the measure. the description of the milestone and, Eligibility criteria shall also ensure that the Ministry of in particular, containing the selected projects comply with the ‘Do no 1.1 Digital Call for proposals Publication of the Economic selection criteria that ensure significant harm’ Technical Guidance 1 transformation Milestone with award criteria notice of the call Q2 2022 Affairs and compliance with the ‘Do no (2021/C58/01) through the use of an exclusion in enterprises and award conditions for proposals Communications significant harm’ Technical list and the requirement of compliance with the Guidance (2021/C58/01), as relevant EU and national environmental specified in the CID Annex. legislation. Summary document duly justifying Number of enterprises to which grants shall be how the target (including all the awarded by the Ministry of Economic Affairs and constitutive elements) was Communications to support their digital Number of Ministry of 1.1 Digital satisfactorily fulfilled. transformation in accordance with the call for enterprises Economic 2 transformation Target Award of grants 0 110 Q4 2023 This document shall include as an proposals. being awarded a Affairs and in enterprises annex the award contracts showing grant Communications that the supported investments comply with the terms of reference. Summary document duly justifying Number of enterprises to which grants shall be Number of Ministry of how the target (including all the awarded by the Ministry of Economic Affairs and 1.1 Digital enterprises Economic constitutive elements) was Communications to support their digital 3 transformation Target Award of grants 110 230 Q4 2025 being awarded a Affairs and satisfactorily fulfilled. transformation in accordance with the call for in enterprises grant Communications This document shall include as an proposals. annex the award contracts showing 5 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation that the supported investments comply with the terms of reference, in addition to those already submitted under Target 2. For the Summary document duly justifying The work on the adoption of international purposes of how the milestone (including all the standards and best practices for the use of these constitutive elements) was digital technologies in construction and the operational satisfactorily fulfilled. management of buildings shall be led and co- arrangements, This document shall include as an ordinated by the Ministry of Economic Affairs Adoption of the Ministry of annex the following documentary and Communications, with the introduction of a international Adoption of 1.2 Economic evidence: construction data classification system, the standards and best international Ministry of 4 Development Milestone Q4 2024 Affairs and a) copy of the secondary legislation creation of a publicly available database for practices for the use standards and best Climate of e-construction Communications introducing a construction data construction materials and construction products of digital technologies practices shall be classification system; and the introduction of building information in construction understood as b) certificate of completion of the modelling in the field of property maintenance. denoting database and the link to the Ministry of database. Climate Summary document duly justifying The public services provided for in the e- how the milestone (including all the construction development plan shall be constitutive elements) was developed, operational and made public on the satisfactorily fulfilled. e-construction platform. Training material shall Entry into service This document shall include as an also be made available to users. of interfaces annex the following documentary This includes services related to the built 1.2 Availability of public between the e- evidence: environment – such as building and planning Ministry of 5 Development Milestone services on the e- construction Q4 2025 a) the e-construction development permits, building registry (logbook), and the Climate of e-construction construction platform platform and the plan; renovation passport. related public b) for each of the services provided services on the e-construction platform, a description of the corresponding services accessible and a summary of the training material (both with the corresponding web links). Summary document duly justifying Number of completed projects for development how the target (including all the and/or implementation of digital construction 1.2 Completion of Number of constitutive elements) was tools and prototypes of innovative digital Ministry of 6 Development Target development and projects 0 102 Q4 2025 satisfactorily fulfilled. solutions drawing on the e-construction platform. Climate of e-construction prototyping projects completed This document shall include as an annex a list of projects, each with a short description of the project, and 6 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation its contribution to the development of digital e-construction services, as well as a reference to the project web page with an approved project final report. Summary document duly justifying Number of projects developing an eFTI platform 1.3 eFTI (electronic how the target (including all the which have received a positive grant decision. Ministry of Development Freight Transport Number of constitutive elements) was Economic 7 of digital Target Information) projects 0 5 Q2 2023 satisfactorily fulfilled. Affairs and waybills platforms launched This document shall include as an Communications services development annex the grant decisions for each of the projects launched. Summary document duly justifying Number of projects enabling transport and how the target (including all the logistics operators to be connected to eFTI 1.3 constitutive elements) was platforms and use eCMR which have received a eCMR (electronic Ministry of Development Number of satisfactorily fulfilled. positive grant decision. Consignment Note) Economic 8 of digital Target projects 0 200 Q4 2024 This document shall include as an interface Affairs and waybills launched annex a list of the projects developments Communications services launched, each with the date of the launch and a reference number of the grant decision. Summary document duly justifying Number of eFTI and eCMR projects completed, how the target (including all the contributing to the deployment of digital waybills. 1.3 Ministry of constitutive elements) was Development Number of Total number of Economic satisfactorily fulfilled. 9 of digital Target projects 0 205 Q4 2025 projects completed Affairs and This document shall include as an waybills completed Communications annex a list of the projects, each services with a reference number of the completion report. Summary document duly justifying An external body shall analyse the impact of the Adoption of ex- how the milestone (including all the support measure on the road freight transport 1.3 post evaluation constitutive elements) was sector and deliver an evaluation report, which Ex-post evaluation of Ministry of Development report by the satisfactorily fulfilled. shall be adopted by the Ministry of Economic the development and Economic 10 of digital Milestone Ministry of Q2 2026 This document shall include as an Affairs and Communications. deployment of the Affairs and waybills Economic Affairs annex the copy of the ex-post digital waybills Communications services and evaluation report adopted by the Communications Ministry and a corresponding web link. 7 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Copy of the publication in the The secondary legislation necessary for the Official Journal (or in the public application and allocation of support shall enter information system of the Ministry of into force. The conditions for support shall be Education) of the secondary established through a ministerial decree, which legislation and reference to the shall be coordinated with the Ministry of Finance Entry into force of 1.4 Skills relevant provisions indicating the and the State Shared Service Centre. secondary legislation reform for the Entry into force of Ministry of entry into force, accompanied by a The ministerial decree shall consist of the setting out the terms 11 digital Milestone secondary Q2 2022 Education & document duly justifying how the following elements: of support for the transformation legislation Research milestone (including all the - objective of the measure, development of of businesses constitutive elements) was - description of supported activities, digital skills satisfactorily fulfilled - beneficiaries and target groups, - conditions for implementation, - eligible costs and used simplifications , - conditions for payments, - conditions for reporting and monitoring. Summary document duly justifying Number of people enrolled in training activities how the target (including all the supported under this measure, consisting of 1.4 Skills constitutive elements) was awareness-raising for SME managers, and reform for the Ministry of satisfactorily fulfilled. upskilling and retraining for ICT specialists. A Enrolment in training Number of 12 digital Target 0 500 Q4 2023 Education & This document shall include as an minimum of 35% of participants enrolled in activities participants transformation Research annex an anonymised list of these training activities shall be women. of businesses participants, indicating for each their gender and the name of the training they have been enrolled for. Summary document duly justifying Number of people having completed their how the target (including all the training course through the training activities 1.4 Skills constitutive elements) was supported under this measure, including reform for the Ministry of satisfactorily fulfilled. awareness-raising for SME managers, and Completion of Number of 13 digital Target 0 2000 Q2 2026 Education & This document shall include as an upskilling and retraining for ICT specialists. A training activities participants transformation Research annex an anonymised list of the minimum of 35% of participants having of businesses individual certificates showing which completed these training activities shall be of the training courses to improve women. digital skills were completed. Summary document duly justifying Number of upskilling and retraining modules Number of how the target (including all the developed with detailed training content, 1.4 Skills curricula constitutive elements) was structure and training materials to provide reform for the Number of new registered in Ministry of satisfactorily fulfilled. training related to digital skills. New curricula 14 digital Target upskilling and Estonia’s Adult 0 5 Q4 2024 Education & This document shall include as an developed for these modules shall be registered transformation retraining modules training Research annex, for each of the 5 upskilling in Estonia’s Adult training information system. of businesses information and retraining modules, a summary system of the training, its contribution to improving digital skills, including its 8 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation content (copy of curricula) , and the corresponding web link. Summary document duly justifying Number of established qualification standards how the target (including all the for ICT specialists from the national register of constitutive elements) was qualification standards which have been Number of satisfactorily fulfilled, in particular analysed and adapted as and if needed. 1.4 Skills Review of qualification describing the analysis and reform for the Ministry of qualification standards adaptations made to the 15 digital Target 0 5 Q4 2024 Education & standards for ICT analysed and qualification standards. transformation Research specialists. adapted as and This document shall include as an of businesses if needed annex a list of renewed qualification standards and link to the website, where the renewed qualification standards are published. A summary document duly justifying The preparatory tasks needed to draw up export how the milestone (including all the strategies shall be completed. These tasks constitutive elements) was include: satisfactorily fulfilled. - an analysis of which external markets are This document shall include as an important to develop strategies, annex the following documentary - an analysis of the interests of businesses, 1.5 Supporting the evidence: - a mapping of the needs of exporting competitiveness of a) the analysis of the interests of enterprises to increase their competitiveness on enterprises in Preparation of the businesses; export markets, Completion of Ministry of 16 foreign markets Milestone development of Q2 2022 b) the mapping of needs of the ranking of the needs. preparatory tasks Foreign Affairs strategies exporting enterprises and their 1.5.1 Country and ranking; regional strategies c) justification for the selection of external markets for which strategies are to be drawn up based on the aforementioned analysis, mapping and ranking of interests/needs and the value added to be achieved. Summary document duly justifying Tenders for drawing up strategies and product 1.5 Supporting the how the milestone (including all the packages with a view to obtaining detailed competitiveness of Procurement of Signature of Ministry of constitutive elements) was market information on foreign markets shall be 17 enterprises in Milestone Q2 2024 studies contracts Foreign Affairs satisfactorily fulfilled. carried out by the Ministry of Foreign Affairs. foreign markets This document shall include as an The corresponding contracts shall be signed. annex a copy of the publication of 9 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation 1.5.1 Country and the call for tenders demonstrating regional strategies alignment with the requirements of the description of the milestone and the list of the contracts signed containing references to the selection criteria. In the context of Summary document duly justifying Number of national and/or regional export this measure, how the target (including all the strategies which shall be developed. These “proactive smart constitutive elements) was strategies shall contain comprehensive analyses advice for satisfactorily fulfilled, including an and provide proactive smart advice for companies” explanation of how the pro-active companies entering and operating in foreign shall mean smart advice has been achieved. markets. enhanced digital This document shall include as an experience for annex a copy of each strategy and enterprises the corresponding web link. seeking to enter or establish themselves in overseas 1.5 Supporting the markets. An competitiveness of enhanced digital enterprises in Number of country Number of Ministry of experience 18 foreign markets Target and regional export strategies 0 13 Q2 2026 Foreign Affairs means a digital strategies published environment 1.5.1 Country and accessible to all regional strategies registered enterprises to a) compare their export capacity with the demand in export markets, b) check entry requirements into strategic markets and c) the availability of support. 10 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation 1.5 Supporting A summary document duly justifying A preparatory analysis allowing the definition of the how the milestone (including all the the content and the locations of the business competitiveness of constitutive elements) was centres shall be prepared by the Ministry of enterprises satisfactorily fulfilled. Foreign Affairs. The analysis shall reveal where Preparatory analysis in foreign Delivery of a This document shall include as an to set up business centres to increase demand to define the content Ministry of 19 markets Milestone preparatory Q2 2022 annex the analytical report enabling for Estonian-made products and services in and the locations of Foreign Affairs analysis the selection of content and export markets. business centres 1.5.2 Innovative locations including the business corresponding value added for centres in key export to be achieved. export markets A summary document duly justifying Number of business centres opened by the how the target (including all the Ministry of Foreign Affairs to support companies 1.5 Supporting constitutive elements) was in entering and operating in important export the satisfactorily fulfilled. markets, as well as to help them to promote competitiveness of This document shall include as an Estonian-made products and services in a way enterprises annex a list of the business centres that takes into account the specificities of local in foreign Number of Number of business Ministry of opened with links to their web business environment and culture. 20 markets Target business 0 7 Q2 2026 centres opened Foreign Affairs presence or (if any) recent activities, centres information on physical premises 1.5.2 Innovative and employees, as well as any Key business Performance Indicators or other centres in key numerical targets to be achieved by export markets the business centres in the medium term. A summary document duly justifying Based on an analysis, the Ministry of Foreign how the milestone (including all the Affairs shall select global digital mission constitutive elements) was destinations and impact groups to increase the 1.5 Supporting the satisfactorily fulfilled. added value of Estonian digital services exports, competitiveness of This document shall include as an increase the export capacity of Estonian Decisions on the enterprises in Setting-up of impact annex the following documentary companies, among which ICT companies in composition of the foreign markets groups and selection evidence: particular, and attract additional foreign impact groups and Ministry of 21 Milestone of destinations for Q2 2022 a) list of global digital mission investments for innovation. the destinations of Foreign Affairs 1.5.3 Global e- global digital destinations the global digital export impact missions b) explanation of the selection of missions groups and virtual impact groups, expert profiles and stages mission destinations, including the selection criteria, the underlying analysis and the expected value added. 11 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation A summary document duly justifying At least 14 missions shall be carried out by the how the target (including all the global impact groups set up by the Ministry of constitutive elements) was Foreign Affairs to increase the added value of satisfactorily fulfilled. Estonian digital services exports, increase the 1.5 Supporting the This document shall include as an export capacity of Estonian companies, among Number of missions competitiveness of annex the following documentary which ICT companies in particular, and attract carried out by the enterprises in evidence: additional foreign investments for innovation. global impact groups Total of number foreign markets a) list of missions carried out, Estonia shall be represented through ‘virtual and number of major of missions and Ministry of 22 Target 0 29 Q2 2026 including the location and target stages’ in at least 15 events. events in which events carried Foreign Affairs 1.5.3 Global e- audience, any corresponding web Estonia was out export impact links, and mission reports for each represented through groups and virtual of the missions; ‘virtual stages’ stages b) list of virtual stages in business events including their location and target audience, any corresponding web links and a short description of each event. For the A summary document duly justifying The Ministry of the Environment shall reform the Ministry of purposes of how the milestone (including all the existing Working Group on Green Technology Climate these constitutive elements) was (set up in 2020) into the RRP’s Green Transition operational satisfactorily fulfilled. Task Force to coordinate the measures on the Creation of a Green Ministry of arrangements, This document shall include as an green transition of companies, and improve 2.1 Green Transition Task Set up of a task Economic the Ministry of annex the following documentary cooperation and exchange of information among 23 transition of Milestone Force to implement force and working Q4 2021 Affairs and Environment evidence: the public sector, stakeholders and interest enterprises and monitor the groups Communications shall be a) adopted decision on establishing groups. The necessary working groups shall be green transition understood as the RRP’s Green Transition Task set up for specific measures. Ministry of denoting Force Regional Affairs Ministry of b) mandate of the Task Force and and Agriculture Climate of its working groups. For the Summary document duly justifying The Green Transition Task Force shall review Ministry of purposes of how the milestone (including all the the existing Circular Economy activities and Climate these constitutive elements) was different action plans into a single Circular operational satisfactorily fulfilled. Economy Action Plan that will lead the Estonian Adoption of the Ministry of arrangements This document shall include as an transition to Circular Economy. 2.1 Green Circular Economy Circular Economy Economic the sentence annex the copy of the adopted 24 transition of Milestone Action Plan by the Action Plan Q4 2022 Affairs and ‘The Green Circular Economy Action Plan and a enterprises Green Transition adopted Communications Transition Task link to the website where the action Task Force , Ministry of Force shall plan can be accessed. Regional Affairs review the and Agriculture existing Circular Economy 12 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation activities and different action plans into a single Circular Economy Action Plan that will lead the Estonian transition to Circular Economy.’ shall be understood as “The Green Transition Task Force shall review the existing Circular Economy activities and different action plans into a single Circular Economy Action Plan that is expected to lead the Estonian transition to Circular Economy.’ Copy of the publication in the The secondary legislation necessary for the relevant public ministerial application and allocation of support shall enter documentation system of the into force. It shall contain provisions ensuring secondary legislation and reference that any action supported under this measure is Entry into force of Ministry of to the relevant provisions (a) focused on areas contributing to the reduction of 2.2 Green skills to secondary legislation Education & Entry into force of indicating the entry into force and greenhouse gas emissions or the adaptation to support the green setting out the terms Research 25 Milestone secondary Q2 2022 (b) ensuring that any action climate change. transition of of support for the legislation supported under this measure is enterprises development of Ministry of focused on areas contributing to the green skills Climate reduction of greenhouse gas emissions or the adaptation to climate change, accompanied by a document duly justifying how the 13 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation milestone (including all the constitutive elements) was satisfactorily fulfilled. Summary document duly justifying Number of upskilling and retraining modules how the target (including all the developed including detailed training content, constitutive elements) was structure and training materials to provide satisfactorily fulfilled. training related to green skills. 2.2 Green skills to Number of upskilling Ministry of This document shall include as an support the green Number of 26 Target and retraining 0 5 Q4 2024 Education & annex, for each of the upskilling and transition of modules modules Research retraining modules, a summary of enterprises the training, its contribution to improving green skills, including its content, structure, and the list of the training materials developed. Summary document duly justifying Number of people having completed one of the how the target (including all the training courses supported through this constitutive elements) was measure. 2.2 Green skills to People taking part in satisfactorily fulfilled. Ministry of support the green upskilling and Number of This document shall include as an 27 Target 0 2830 Q2 2026 Education & transition of retraining participants annex an anonymised list of the Research enterprises programmes individual certificates proving which of the training courses to improve green competences the certificate holders have completed. Summary document duly justifying A project manager shall be recruited and a how the milestone (including all the broad-based group of stakeholders shall be set constitutive elements) was up to coordinate investment planning and satisfactorily fulfilled. implementation. The role of the project manager This document shall include as an shall be set out to gather information from Ministry of annex the following documentary market participants and design the necessary Establishment of a 2.3 Green Recruitment of a Climate evidence: support measures and procurement. The working group to plan technologies project manager a) work contract concluded with the working group shall be composed of parties 28 Milestone and set up the Q4 2021 development and set up of a Environmental project manager (with personal or involved in the development of entrepreneurship development programme working group Investment sensitive information blacked out); and shall undertake to meet at least three times programme Centre b) a list of members of the working a year to take stock of developments in group with their function; investment-related activities and provide c) meeting schedule of the working recommendations for further action. The working group; group shall draw up provisions related to the d) copy of the document containing selection of actions to be supported under the the plan determining how the development programme in such a way that it is 14 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation selection criteria for actions to be ensured that each action directly contributes supported will be set. either to lowering greenhouse gas emissions or supporting adaptation to climate change. Summary document duly justifying The public procurement processes for at least 5 how the milestone (including all the development clusters shall be completed and constitutive elements) was the contracts shall be awarded to the winning satisfactorily fulfilled. parties. Support measures shall be designed This document shall include as an and their first rounds shall be opened to at least annex the following documentary 10 start-ups. The selection processes shall Contracts signed Ministry of evidence: ensure that each supported action directly 2.3 Green Set up of the Green for all development Climate “Cluster" shall a) contracts signed by the contributes either to lowering greenhouse gas technologies Technologies clusters and be understood contractor and the competent emissions or supporting adaptation to climate 29 Milestone Q2 2024 development Development support measures Environmental and referred to authority for at least 5 development change. programme Programme designed and Investment as “accelerator” clusters; opened Centre b) copy of the publication of the call for proposals for at least to 10 eligible start-ups ensuring that each supported action directly contributes either to lowering greenhouse gas emissions or supporting adaptation to climate change. Summary document duly Number of clusters supported by the justifying how the target development programme. (including all the constitutive Number of Ministry of elements) was satisfactorily clusters “Custer” Climate fulfilled. 2.3 Green supported shall be This document shall include as technologies through the Number of understood 30 Target 0 5 Q2 2026 Environment an annex the certificates of development Green clusters and referred al completion signed by the programme Technology to as Investment contractor and the competent Development "accelerator" Centre authority demonstrating that the Programme cluster developments have been completed and specifying their location. Number of startups Ministry of Summary document duly justifying Number of startups supported by the 2.3 Green supported through Climate how the target (including all the development programme and which have technologies the Green Number of constitutive elements) was received resources from private investors during 31 Target 0 10 Q2 2026 development Technology startups Environmental satisfactorily fulfilled. or after the development programme. programme Development Investment This document shall include as an Programme and Centre annex a list of supported start-ups 15 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation which have received showing for each the name, the private investment registry code in the commercial register, the supported actions and the resources received from private investors; with extracts from the companies’ financial statements showing the resources they have attracted from private investors during or after the development programme. Copy of the publication in the The conditions for granting support shall be Official Journal of the ministerial enacted by a decree of the responsible minister. decree setting out the terms and The requirements set shall include eligibility conditions of grant eligibility, and criteria to ensure that the selected projects reference to the relevant provisions comply with the ‘Do no significant harm’ indicating the entry into force, Technical Guidance (2021/C58/01) by means of accompanied by a document duly an exclusion list and compliance with relevant justifying how the milestone EU and national environmental legislation. The (including all the constitutive selection/eligibility criteria shall specify that the elements) was satisfactorily fulfilled. supported activities and/or enterprises This document shall include as an contribute to a climate-neutral economy, annex the extract of the official resilience and climate change adaptation documents containing the selection including circular economy objectives such as 2.4 Modernisation Entry into force of the criteria that ensure compliance with in-house implementation of circular economy Ministry of of the business ministerial decree Entry into force of the ‘Do no significant harm’ principles, transfer of transport and storage of Economic 32 models in Milestone setting out the terms the ministerial Q2 2022 Technical Guidance (2021/C58/01), companies to new foundations. Affairs and manufacturing and conditions of decree as specified in the CID Annex.In the Communications companies grant eligibility case of ETS installations, this document shall contain the following information: 1) a unique identifier, the name, the location, the Installation ID/Aircraft Operator ID in the European Union Transaction Log (EUTL) as established by Art. 5 of the Commission Regulation (EU) 389/2013; 2) the projected level of GHG emissions per unit of product for awarded projects with activities under the EU ETS; 16 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation 3) brief description of the project and technologies used.In case the projected GHG emissions are not expected to decrease to significantly below benchmark, an explanation of the reasons why this is not possible should be provided. Summary document duly justifying Projects having received a grant disbursement how the target (including all the in accordance with the eligibility conditions set constitutive elements) was out in the call for proposals to introduce satisfactorily fulfilled. business models that support the transition to a This document shall include as an climate-neutral economy, resilience and annex a list of projects having adaptation to climate change, including circular received a grant disbursement economy objectives. showing, for each item, the beneficiaries, the reference number Ministry of of the payment order, the area of 2.4 Modernisation Economic intervention/action supported and a of the business Affairs and brief summary of the expected Number of projects Number of 33 models in Target 0 70 Q4 2025 Communications contribution to the transition to a supported projects manufacturing climate-neutral economy, resilience companies Enterprise and adaptation to climate change, Estonia including circular economy objectives. In the case of ETS installations, this document shall contain the unique identifier, the name, the location, the Installation ID/Aircraft Operator ID in the European Union Transaction Log (EUTL) as established by Art. 5 of the Commission Regulation (EU) 389/2013. Ministry of Summary document duly justifying Call for proposals to support resource-efficient Climate how the milestone (including all the green technologies and the valorisation of bio- constitutive elements) was resources shall be published and open for 2.5 Deployment Publication of the Environmental satisfactorily fulfilled. applications, including eligibility criteria to of resource Publication of call for notice for calls for Investment This document shall include as an ensure that the selected projects comply with 34 Milestone Q2 2022 efficient green proposals for grants proposals for Centre annex a copy of the publication of the ‘Do no significant harm’ Technical Guidance technologies grants the call for proposals demonstrating (2021/C58/01) by means of an exclusion list and Ministry of alignment with the requirements of compliance with relevant EU and national Regional Affairs the description of the milestone and, environmental legislation. The and Agriculture in particular, containing the selection/eligibility criteria shall specify that the 17 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation selection criteria that ensure supported activities and/or enterprises PRIA compliance with the ‘Do no contribute to a climate-neutral economy, significant harm’ Technical resilience and climate change adaptation Guidance (2021/C58/01), as specified in the CID Annex. In the case of ETS installations, this document shall contain the following information: 1) a unique identifier, the name, the location, the Installation ID/Aircraft Operator ID in the European Union Transaction Log (EUTL) as established by Art. 5 of the Commission Regulation (EU) 389/2013; 2) the projected level of GHG emissions per unit of product for awarded projects with activities under the EU ETS; 3) brief description of the project and technologies used.In case the projected GHG emissions are not expected to decrease to significantly below benchmark, an explanation of the reasons why this is not possible should be provided. Ministry of Summary document duly justifying Award of grants to 36 projects selected under Climate how the target (including all the the competitive call for proposals, for green constitutive elements) was technologies, for industrial plants and for Environmental satisfactorily fulfilled. valorisation of bioresources, in compliance with This document shall include as an the terms of reference. 2.5 Deployment Number of projects Investment annex the following documentary of resource awarded grants Number of Centre evidence: 35 Target 0 36 Q4 2023 efficient green following the call for projects a) copy of the decisions awarding technologies proposals Ministry of grants to projects selected ; Regional Affairs b) an explanation of the and Agriculture correspondence of the supported investments to the terms of reference. PRIA 18 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Ministry of Summary document duly justifying Number of completed projects to improve Climate how the milestone (including all the resource efficiency through the enhancement of constitutive elements) was green technologies and bio-resources, on the Environmental satisfactorily fulfilled. This document basis of calls for proposals and established 2.5 Deployment Investment shall include as an annex the final eligibility criteria. of resource Number of projects Number of Centre reports of the projects signed by the 36 Target 0 36 Q2 2026 efficient green completed projects beneficiary and approved by the technologies Ministry of competent authority demonstrating Regional Affairs that the projects have been and Agriculture completed and are in line with the requirements of the target. PRIA Summary document duly justifying A contractual agreement shall be signed how the milestone (including all the between the Ministry of Economic Affairs and constitutive elements) was Communications and SmartCap to manage the satisfactorily fulfilled. Green Fund, which shall contain: This document shall include as an - Investment objectives to invest in enterprises Ministry of annex the contract signed by the and activities contributing to a climate-neutral Economic Ministry of Economic Affairs and economy and to improving resilience to climate Signature of Affairs and Communications and SmartCap to change, including awareness-raising measures, contractual Communications manage the Green Fund - Eligibility criteria for compliance with the ‘Do no agreement between Signature of demonstrating alignment with the significant harm’ Technical Guidance 37 2.6 Green Fund Milestone the Ministry of contractual Q4 2021 SA KredEx/ requirements of the milestone and, (2021/C58/01) of supported beneficiaries Economic Affairs and agreement Enterprise in particular, containing the through the use of sustainability proofing, an Communications and Estonia selection criteria that ensure exclusion list and the requirement of compliance SmartCap compliance with the ‘Do no with the relevant EU and national environmental SmartCap significant harm’ Technical legislation. Guidance (2021/C58/01), as specified in the CID Annex and the relevant Union and national environmental legislation. Summary document duly justifying SmartCap shall adopt the investment policy for how the milestone (including all the the Green Fund, in line with the contractual Ministry of constitutive elements) was agreement signed between the Ministry of Adoption of the Economic satisfactorily fulfilled. Economic Affairs and Communications and Investment policy investment policy Affairs and This document shall include as an SmartCap, including the investment objectives 38 2.6 Green Fund Milestone document adopted Q4 2021 document by Communications annex the adopted investment and the eligibility criteria to ensure compliance by SmartCap SmartCap policy in line with the requirements with the ‘Do no significant harm’ Technical of the milestone and, in particular, Guidance (2021/C58/01) of supported SmartCap containing the selection criteria that beneficiaries under this measure through the ensure compliance with the ‘Do no use of sustainability proofing, the requirement of 19 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation significant harm’ Technical compliance with the relevant EU and national Guidance (2021/C58/01), as environmental legislation, and the requirement specified in the CID Annex. for beneficiaries that derived more than 50% of their revenues during the preceding financial year from activities or assets in the exclusion list to adopt and publish green transition plans. Summary document duly justifying At least EUR 55 million (excluding operating how the target (including all the expenditures) shall be invested by the Green constitutive elements) was Fund in venture capital funds or enterprises in satisfactorily fulfilled. line with the investment policy. This document shall include as an annex a list of investments by the Volume of Ministry of Green Fund showing for each item investments in Volume of Economic the amount invested, the 39 2.6 Green Fund Target venture capital funds invested capital 0 55 000 000 Q4 2024 Affairs and beneficiaries (final recipients of or equity investments (in EUR) Communications funds), the area of in enterprises intervention/action supported and a SmartCap brief description of the expected contribution to a climate-neutral economy and to improving resilience to climate change, including awareness-raising measures. Summary document duly justifying At least EUR 90 million (excluding operating how the target (including all the expenditures) shall be invested by the Green constitutive elements) was Fund in venture capital funds or enterprises in satisfactorily fulfilled. line with the investment policy. This document shall include as an annex a list of investments by the Volume of Ministry of Green Fund in addition to those investments in Volume of Economic under Target 39 showing for each 40 2.6 Green Fund Target venture capital funds invested capital 55 000 000 90 000 000 Q2 2026 Affairs and item the amount invested, the or equity investments (in EUR) Communications beneficiaries, the area of in enterprises intervention/action supported and a SmartCap brief description of the expected contribution to a climate-neutral economy and to improving resilience to climate change, including awareness-raising measures. 20 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Copy of the publication in the Development of project selection criteria, and Official Journal of the ministerial entry into force of the ministerial decree on the decree on the conditions for conditions for granting support for projects granting support for projects related related to integrated green hydrogen to integrated green hydrogen technologies. The terms of reference for this technologies, and reference to the support shall include eligibility criteria that relevant provisions (a) indicating the ensure that the objectives of the selected entry into force and (b) ensuring projects comply with the ‘Do no significant harm’ compliance with the ‘Do no Technical Guidance (2021/C58/01) through the significant harm’ Technical use of an exclusion list and the requirement of Guidance (2021/C58/01), as compliance with the relevant EU and national specified in the CID Annex, environmental legislation. accompanied by a document duly justifying how the milestone (including all the constitutive elements) was satisfactorily fulfilled. 2.7 Creating In the case of ETS installations, this Ministry of opportunities for Entry into force of the document shall contain the following Climate the uptake of ministerial decree Entry into force of information: 41 renewables-based Milestone setting out the terms the ministerial Q4 2022 1) a unique identifier, the name, the Environmental green and conditions for decree location, the Installation ID/Aircraft Investment hydrogen granting support Operator ID in the European Union Centre technologies Transaction Log (EUTL) as established by Art. 5 of the Commission Regulation (EU) 389/2013; 2) the projected level of GHG emissions per unit of product for awarded projects with activities under the EU ETS; 3) brief description of the project and technologies used. In case the projected GHG emissions are not expected to decrease to significantly below benchmark, an explanation of the reasons why this is not possible should be provided. 21 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Summary document duly justifying The necessary equipment for green hydrogen how the milestone (including all the production shall be purchased, installed and put constitutive elements) was in operation by project promoters selected in the satisfactorily fulfilled. call for proposals. This document shall include as an annex the following documentary evidence: a) certificates of completion signed by the contractor and the project 2.7 Creating promoter demonstrating that the Ministry of opportunities for Procurement, equipment has been installed, is Climate the uptake of Technologies and installation and operational and is in line with the 42 renewables-based Milestone equipment for green start of operation Q3 2025 requirements for this measure Environmental green hydrogen production of technologies described in the CID annex; Investment hydrogen and equipment b) a list of equipment showing for Centre technologies each item the type, the reference number and the location; c) in the case of ETS installations, the unique identifier, the name, the location, the Installation ID/Aircraft Operator ID in the European Union Transaction Log (EUTL) as established by Art. 5 of the Commission Regulation (EU) 389/2013; Summary document duly justifying Grants shall be allocated to investments in how the target (including all the renewables based green hydrogen technologies 2.7 Creating constitutive elements) was in line with the investment policy, representing at Grants allocated to Ministry of opportunities for satisfactorily fulfilled. least EUR 49.49 million renewables-based Climate the uptake of This document shall include as an green hydrogen 43 renewables-based Target EUR 0 49 490 000 Q2 2026 annex a list of investments in technologies Environmental green renewables based green hydrogen representing at least Investment hydrogen technologies showing for each item EUR 49.49 million Centre technologies the allocated grant amount, the beneficiaries and the location and a short description of the project. Summary document duly justifying A call for proposals to support investment Ministry of Publication of the how the milestone (including all the projects for the transition of companies from Economic 2.8 Supply security notice for call for constitutive elements) was fossil energy sources to alternative energy 43a Milestone Q4 2023 Affairs and investment support proposals for grants satisfactorily fulfilled. This document supply sources shall be published and open for Communications shall include as an annex a copy of applications, including eligibility criteria to the publication of the call for ensure that the selected projects comply with 22 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation proposals demonstrating alignment the ‘Do no significant harm’ Technical Guidance with the requirements of the (2021/C58/01) by means of requirements description of the milestone and, in related to supported eligible alternative energy particular, containing the selection sources and supported activities as set out in criteria that ensure compliance with the measure description and compliance with the ‘Do no significant harm’ relevant EU and national environmental Technical Guidance (2021/C58/01), legislation. as specified in the CID Annex. In the case of ETS installations, this document shall contain the following information: 1) a unique identifier, the name, the location, the Installation ID/Aircraft Operator ID in the European Union Transaction Log (EUTL) as established by Art. 5 of the Commission Regulation (EU) 389/2013; 2) the projected level of GHG emissions intensity for each relevant sub-installation for awarded projects with activities under the EU ETS; 3) brief description of the project and technologies used. In case the projected GHG emissions are not expected to decrease to significantly below benchmark, an explanation of the reasons why this is not possible should be provided. Summary document duly justifying At least 70 projects awarded support for how the target (including all the investments for the transition of companies from constitutive elements) was fossil energy sources to alternative energy Ministry of satisfactorily fulfilled. This document supply sources. The projects shall be in Number of projects Economic shall include as an annex the compliance with the eligibility criteria set out in 2.8 Supply security Projects 43b Target awarded following 0 70 Q4 2024 Affairs and following documentary evidence: the call for proposals. investment support awarded the call for proposals Communications a) copies of the decisions awarding support to projects b) an explanation of the compliance of the supported projects with the eligibility 23 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation criteria set out in the call for proposals. Summary document duly justifying At least 70 projects supporting the investments how the target (including all the for the transition of companies from fossil constitutive elements) was energy sources to alternative energy supply satisfactorily fulfilled. This document sources shall be completed. The projects shall shall include as an annex copies of be in compliance with the eligibility criteria set Ministry of the final reports of the projects out in the call for proposals. Economic 2.8 Supply security Number of projects Projects submitted through 43c Target 0 70 Q2 2026 Affairs and investment support completed completed https://etoetus.rtk.ee/ and approved Communications by the competent authority demonstrating that the projects have been completed and are in line with the requirements of the target, especially with the eligibility criteria set out in the call for proposals.. Summary document duly justifying Creation of a Data Management Team in how the milestone (including all the Statistics Estonia through the recruitment of constitutive elements) was expert staff tasked with coordinating the data satisfactorily fulfilled. governance framework and supporting other Setting up a data This document shall include as an public authorities. In addition, posts shall be 3.1 Creation and management team in Establishment of Ministry of annex the following documentary created at the Ministry of Economic Affairs and development of a the Statistical Office, the necessary Economic evidence: Communications and at the State Information centre of the Ministry of organisational 44 Milestone Q4 2021 Affairs and a) a copy of the description of the System Agency to carry out development excellence for data Economic Affairs and structure for Communications responsibilities (job description) of projects. By the end of 2021, at least five people governance and Communications and coordinating data the newly recruited employees shall be recruited across the three entities. open data the State Information management across the three entities; System Authority b) details about the newly established teams, such as their composition and when employees were recruited on their new job. Summary document duly justifying Number of completed projects contributing to 3.1 Creation and how the target (including all the ensuring an improved reusability of data from Ministry of development of a constitutive elements) was public institutions, with up-to-date and accurate Completion of data Economic centre of Number of satisfactorily fulfilled. descriptions of databases and datasets. 45 Target quality improvement 0 430 Q2 2025 Affairs and excellence for data projects This document shall include as an projects Communications governance and annex a list of projects showing for open data each item the information about the concerned dataset(s) (typically a 24 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation brief description of the dataset(s), data holder and volume of the data) and the nature of the improvements. Summary document duly justifying The number of datasets made public on the how the target (including all the National Open Data Portal and thus available 3.1 Creation and Ministry of constitutive elements) was from the EU Open Data portal shall be development of a Publication of Number of Economic satisfactorily fulfilled. increased from 707 on 13 August 2021 to 2600. centre of datasets on the 46 Target published 707 2600 Q4 2025 Affairs and This document shall include as an excellence for data national open data datasets Communications annex a list of newly published governance and portal datasets showing for each item the open data date of publication, a short description and a link. Summary document duly justifying Number of citizen life event services and/or how the target (including all the proactive services launched online. constitutive elements) was The corresponding IT solutions enabling the satisfactorily fulfilled. provision of the services shall be operational at 3.2 Development This document shall include as an least in the basic parts of a given service and Ministry of of Launch of personal annex the following documentary are subject to a further development during the Number of Economic event services and life event services evidence: implementation of the measure. 47 Target services which 0 2 Q4 2022 Affairs and proactive digital and/or proactive a) a description of each of the life The selection of concerned services shall be are operational Communications public services for services event services launched online, with based on the development plan for personal life individuals the date of the launch and a link; event and proactive services. b) extract of the relevant parts of the technical specifications of the IT tools and reports of their testing upon development completion. Summary document duly justifying Number of citizen life event services and/or how the target (including all the proactive services launched online. constitutive elements) was The corresponding IT solutions enabling the satisfactorily fulfilled. provision of the services shall be operational at 3.2 Development This document shall include as an least in the basic parts of a given service and Ministry of of annex the following documentary are subject to a further development during the Launch of personal Number of Economic event services and evidence: implementation of the measure. 48 Target event services and services which 2 10 Q4 2025 Affairs and proactive digital a) a description of each of the life The selection of concerned services shall be proactive services are operational Communications public services for event services launched online in based on the development plan for personal life individuals addition to those under target 47, event and proactive services. with the date of the launch and a link; b) extract of the relevant parts of the technical specifications of the IT 25 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation tools and reports of their testing upon development completion. Summary document duly justifying Number of IT development projects contributing how the target (including all the to the implementation of the business event constitutive elements) was services and gateway that have successfully satisfactorily fulfilled. deployed new developments online. These This document shall include as an development projects shall be either directly annex the following documentary related to the development of the digital gateway Number of evidence: for entrepreneurs or to the development of Deployment of IT projects that Ministry of a) a description of the project and business-event services, which additionally 3.3 Development developments have Economic the corresponding developments include the development of various related of event services contributing to the 49 Target successfully 0 1 Q4 2022 Affairs and successfully deployed online, systems for interfacing with the digital gateway. and digital gateway implementation of the deployed new Communications including their contribution to the As a result of each development project, at least for entrepreneurs business event developments implementation of the business a minimally functional IT solution shall be services and gateway online event services and gateway; completed (i.e., the IT solution shall be b) steering group’s protocol stating operational at least in the basic parts for the end the completion of the IT users (entrepreneurs) and shall be able to developments and their testing, and provide feedback for further development needs receipt for key works performed; during the reform implementation period or c) link to the tools, as accessible to afterwards). the users. Summary document duly justifying Number of IT development projects contributing how the target (including all the to the implementation of the business event constitutive elements) was services and gateway that have successfully satisfactorily fulfilled. deployed new developments online. This document shall include as an These development projects shall be either annex the following documentary directly related to the development of the digital Number of Deployment of IT evidence: gateway for entrepreneurs or to the 3.3 Development projects that Ministry of developments a) a description of the projects and development of business-event services, which of have Economic contributing to the the corresponding developments additionally include the development of various 50 event services and Target successfully 1 10 Q4 2025 Affairs and implementation of the successfully deployed online (in related systems for interfacing with the digital digital gateway for deployed new Communications business event addition to those under target 49), gateway. As a result of each development entrepreneurs developments services and gateway including their contribution to the project, at least a minimally functional IT solution online implementation of the business shall be completed (i.e., the IT solution shall be event services and gateway; operational at least in the basic parts for the end b) steering group’s protocol stating users (entrepreneurs) and shall be able to the completion of the IT provide feedback for further development needs developments and their testing, and during the reform implementation period or receipt for key works performed; afterwards). 26 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation c) link to the tools, as accessible to the users. Summary document duly justifying Number of digital public services available how the target (including all the through the platform of the virtual assistant. constitutive elements) was satisfactorily fulfilled. This document shall include as an Number of 3.4 #Bürokratt Ministry of annex the following documentary Access to digital public digital programme Economic evidence: public services services 51 (national virtual Target 0 1 Q2 2022 Affairs and a) a description of the digital public through the virtual accessible assistant platform Communications service accessible through the assistant platform through the and ecosystem) platform of the virtual assistant; virtual assistant b) proof of the access to the service through the virtual assistant; c) a link to the service, as accessible to the users via a browser. Summary document duly justifying Number of service environments in which the how the target (including all the virtual assistant shall be operational. A “service constitutive elements) was environment” refers to a website of public satisfactorily fulfilled. authorities. 3.4 #Bürokratt Introduction of the Ministry of This document shall include as an programme Bürokratt virtual Number of Economic annex: 52 (national virtual Target assistant in digital service 0 18 Q4 2025 Affairs and a) a list of the service environments assistant platform public services environments Communications in which the virtual assistant is and ecosystem) environments operational (with the corresponding web links); b) proof that new service environments are accessible through Bürokratt. Summary document duly justifying Number of digital public services available Number of 3.4 #Bürokratt Ministry of how the target (including all the through the platform of the virtual assistant. Access to digital public digital programme Economic constitutive elements) was public services services 53 (national virtual Target 1 20 Q4 2025 Affairs and satisfactorily fulfilled. through the virtual accessible assistant platform Communications This document shall include as an assistant platform through the and ecosystem) annex for the services addressed in virtual assistant addition to those under target 51: 27 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation a) a description of the digital public services accessible through the platform of the virtual assistant; b) proof of the access to the services through the virtual assistant; c) links to the services, as accessible to the users via a browser. Summary document duly justifying Basic IT services provided/shared centrally shall how the milestone (including all the open for subscription by new users (ministries constitutive elements) was and other authorities). satisfactorily fulfilled. This document shall include as an annex the following documentary 3.5 Opening of shared Ministry of evidence: Reconfiguration of Development of server hosting and Economic a) a description of the organisational basic digital centrally computer 54 Milestone Q3 2022 Affairs and changes carried out to centralise the services and safe delivered/shared IT workstation Communications delivery of basic IT services; transition to cloud base services services to public b) the list and the description of the infrastructure authorities services delivered centrally as a result of these changes; c) certificates of completion of the works for the development of centrally delivered/shared IT base services. Summary document duly justifying Number of information systems for which the how the target (including all the migration to the private cloud infrastructure shall constitutive elements) was be completed. satisfactorily fulfilled. This document shall include as an 3.5 Number of Ministry of annex the following documentary Reconfiguration of Deployment of information Economic evidence: basic digital national private cloud systems 55 Target 0 10 Q4 2023 Affairs and a) certificates of completion signed services and safe infrastructure by migrated to the Communications by the contractor and the competent transition to cloud public authorities national private authority demonstrating that the infrastructure cloud national private cloud is operational; b) a description of the information systems migrated to the national private cloud including the date of completion of the migration. 28 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Summary document duly justifying It shall become possible to host and operate how the milestone (including all the information systems migrated to the private Completion of the 3.5 constitutive elements) was cloud from the data embassy. New hardware extension of the Ministry of Reconfiguration of satisfactorily fulfilled. and licenses shall be acquired and set up for Extension of the national private Economic basic digital This document shall include as an this purpose. 56 Milestone cloud infrastructure to cloud to the Q4 2023 Affairs and services and safe annex proof of the acquisition of the data embassy infrastructure of Communications transition to cloud new hardware and licenses Estonia’s data infrastructure specifically aimed for the extension embassy of the national private cloud to the infrastructure of the data embassy. Summary document duly justifying Number of critical systems migrated to the how the target (including all the National Cloud Data Embassy infrastructure and 3.5 constitutive elements) was platform. Critical systems are systems that are Migration of critical Ministry of Reconfiguration of satisfactorily fulfilled. vital to the state's sustainability. systems to the Economic basic digital Number of This document shall include as an 57 Target national cloud 0 10 Q4 2024 Affairs and services and safe critical systems annex a description of the critical infrastructure of the Communications transition to cloud systems migrated to the national data embassy infrastructure cloud infrastructure of the data embassy, including the certificate of completion of the migration. Summary document duly justifying Number of comprehensive security tests carried 3.5 Ministry of how the target (including all the out by the Information System Authority – the Reconfiguration of Central security Economic constitutive elements) was test results shall be summarised in reports. basic digital testing of public Number of tests 58 Target 0 16 Q4 2024 Affairs and satisfactorily fulfilled. services and safe authorities’ performed Communications This document shall include as an transition to cloud information systems annex the reports summarising infrastructure each of the tests performed. Copy of the publication in the The following steps shall be completed to allow Official Journal for primary the Centre for Strategic Analysis to access and Entry into force of the legislation and the secondary process data relevant to the detection and amendment of the Provision in the legislation, and copy of the prevention of money laundering and terrorist Money Laundering law indicating the amendments to relevant financing: 3.6 Establishing and Terrorist date of entry into administrative acts that are critical (1) an amendment of the Money Laundering and the strategic Financing Prevention force of amended for achieving the objectives Terrorist Financing Prevention Act shall be analysis of money Act and of other Ministry of 59 Milestone act and entry into Q4 2024 described in the milestone and in published in the Riigi Teataja and enter into laundering and legislative, Finance force of other the CID and reference to the force, terrorist financing administrative and legislative, relevant provisions indicating the (2) amendments to the statutes of the relevant in Estonia contractual changes administrative and entry into force, accompanied by a national datasets shall enter into force, needed for the contractual acts document duly justifying how the (3) amendments to the terms and conditions of Centre for Strategic milestone (including all the Financial Intelligence Unit data exchange Analysis constitutive elements) was contracts shall be signed by the contracting satisfactorily fulfilled, with parties. 29 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation appropriate links to the underlying evidence. Summary document duly justifying The development of the ICT system allowing how the milestone (including all the real-time analysis to detect and prevent money constitutive elements) was laundering shall be completed. The system shall satisfactorily fulfilled. be operational and used by the Financial This document shall include as an Intelligence Unit. annex the following documentary Development of the evidence: 3.7 Information new real-time ICT a) certificates of completion signed system for real- analysis system for Delivery of the new by the contractor and the competent time strategic the Centre for ICT system to the Ministry of 60 Milestone Q2 2026 authority demonstrating that the analysis of money Strategic Analysis, Financial Finance project has been completed, is laundering and and delivery to the Intelligence Unit operational and is in line with the terrorist financing Financial Intelligence requirements of the milestone; Unit b) examples of strategic analysis produced by the system and used by the Financial Intelligence Unit or other Law Enforcement Authorities and/or statistics on the functioning of the system. Summary document duly justifying Number of new sites (residential, companies, how the target (including all the establishments) covered by VHCN (and which constitutive elements) was have thus the possibility to get a connection of satisfactorily fulfilled. at least 100 Mbps) thanks to the measure. Ministry of This document shall include as an 3.8 Construction of Rollout of very high Economic annex a list of supported projects very high capacity 61 Target capacity broadband Number of sites 0 4000 Q4 2024 Affairs and showing for each item the broadband network to new sites Communications beneficiaries of the funding, the networks concerned geographical area and the number of sites which have become eligible for Very High Capacity Networks (with a connection of at least 100 Mbps). Ministry of Summary document duly justifying Number of additional sites (residential, 3.8 Construction of Rollout of very high Economic how the target (including all the companies, establishments) covered by VHCN very high capacity 62 Target capacity broadband Number of sites 4000 8097 Q4 2025 Affairs and constitutive elements) was (and which have thus the possibility to get a broadband network to new sites Communications satisfactorily fulfilled. connection of at least 100 Mbps) thanks to the networks measure. 30 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation This document shall include as an annex a list of supported projects showing for each item the beneficiaries of the funding, the concerned geographical area, and the number of sites which have become eligible for Very High Capacity Networks (with a connection of at least 100 Mbps), in addition to those under target 61. Summary document duly justifying Conclusion of a cooperation agreement by SA how the milestone (including all the KredEx/Enterprise Estonia with county constitutive elements) has been development centres by which in each county of The renovation satisfactorily fulfilled. This document Estonia SA KredEx/Enterprise Estonia shall Conclusion of the Conclusion of the advice in shall include as an annex the provide at least one trained specialist in the cooperation cooperation Harjumaa following documentary evidence: county development centre who shall provide agreement stipulating agreement 4.1 Energy county is a) copies of the cooperation advice on renovation. conditions for between SA Ministry of 63 efficiency Milestone Q4 2022 expected to be agreements between SA cooperation between KredEx/ Enterprise Climate promotion provided by the KredEx/Enterprise Estonia and each SA Kredex/Enterprise Estonia and county SA of the 14 county development Estonia and county development KredEx/Enterpri centres; development centres centres se Estonia. b) documentary evidence from SA KredEx/Enterprise Estonia that renovation advice is being provided directly in Harjumaa county. Summary document duly justifying SA KredEx/Enterprise Estonia shall update the Digital tools to how the milestone (including all the Housing homepage to ensure fast, up-to-date facilitate access to constitutive elements) has been and operational information for those interested information on satisfactorily fulfilled. This document in renovation and for applicants. Operational user- 4.1 Energy renovation including shall demonstrate that the Housing Online digital tools shall be made available to friendly renovation Ministry of 64 efficiency Milestone visualising the results Q4 2024 homepage has been updated and allow parties interested in renovation to visualise website and pricing Climate promotion of the renovation and the digital tools as specified in the the possible outcome and calculate the potential models estimating the cost of milestone have been completed and costs with and without support schemes when renovation have are operational and include the link adding the parameters of their building. become operational to the homepage and the digital tools. Summary document duly justifying SA KredEx/Enterprise Estonia shall publish calls Publication of calls 4.2 Support for the how the milestone (including all the for applications aimed at improving the energy for applications for Publication of calls renovation of Ministry of constitutive elements) has been efficiency of residential apartment buildings. The 65 Milestone residential apartment for housing Q2 2022 apartment Climate satisfactorily fulfilled. support shall be differentiated between regions buildings renovation renovation grants buildings on the basis of the value of the real estate, with grants a higher rate of support in regions with low 31 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation This document shall include as an average property value. annex the following documentary Support shall be granted to renovation projects evidence: that achieve an improvement of at least one a) copy of the publication of the call energy efficiency class or, in the case of for applications including the complete renovations, at least the energy technical specifications showing that efficiency class C. The renovations shall the call is in line with the correspond to at least medium-depth requirements of the milestone and renovations representing an average level of of the description of the investment primary energy savings of at least 30% as set in the CID; out in European Commission Recommendation b) a description of the process of (EU) 2019/786. The results shall be certified by obtaining and presenting ex-ante ex-ante and ex-post Energy Performance and ex-post Energy Performance Certificates. Certificates. Summary document duly justifying At least 2 600 dwellings shall be renovated and how the target (including all the achieve an improvement of at least one energy constitutive elements) has been efficiency class or, in the case of complete satisfactorily fulfilled. renovations, at least the energy efficiency class This document shall include as an C. The renovations shall correspond to at least annex the following documentary medium-depth renovations representing an evidence: average level of primary energy savings of at a) aggregated energy performance least 30% as set out in European Commission 4.2 Support for the Dwellings with certificate before and after the Recommendation (EU) 2019/786. The results renovation of Number of Ministry of 66 Target improved energy 0 2600 Q4 2024 renovation action; shall be certified by ex-ante and ex-post Energy apartment dwellings Climate performance b) a list of apartment buildings Performance Certificates. buildings together with the number of dwellings renovated and, for each apartment building, the renovation actions completed, the registration numbers of the energy performance certificates before and after the renovation action, and expected energy saving achieved. Summary document duly justifying Annual emissions of at least 2 200 tons of CO2 how the target (including all the equivalent have been saved. The target shall be constitutive elements) has been measured as the decrease of the greenhouse 4.2 Support for the Estimated annual satisfactorily fulfilled. gas (GHG) emissions as a sum of all the renovation of reduction of tons of Ministry of 67 Target N/A 0 2200 Q2 2026 This document shall include as an renovation projects finished by 2024. The apartment greenhouse gas CO2eq/year Climate annex the following documentary energy efficiency class for each renovated buildings emissions evidence: building shall be measured at the latest in 2025; a) overview of the renovation and their annual greenhouse gas emissions actions carried out; estimated on this basis. The baseline shall refer 32 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation b) aggregated energy performance to the estimated greenhouse gas emissions of certificates before and after the the building prior to renovation. It shall be renovation action to demonstrate assessed if the activities of the support measure gain in energy efficiency class; have been carried out and all the necessary c) a calculation based on the model documents have been submitted by the of SA KredEx/Enterprise Estonia for apartment associations (such as Energy energy consumption demonstrating Performance Certificate, audit). The calculation the decrease of the greenhouse gas of the GHG emission savings result shall be (GHG) emissions as a sum of all the based on the model of SA Kredex/Enterprise renovation projects finished by Estonia for energy consumption and other 2024. relevant data. The results achieved shall be delivered at the end of the supporting activities. Summary document duly justifying SA KredEx/Enterprise Estonia shall publish calls how the milestone (including all the for applications aimed at improving the energy constitutive elements) has been efficiency of private residential buildings. The satisfactorily fulfilled. support shall be differentiated between regions This document shall include as an on the basis of the value of the real estate, with annex the following documentary a higher rate of support in regions with low 4.3 Support for the evidence: a) the selection criteria, average property value. renovation of small Published calls for Ministry of which include regional differentiation Support shall be granted to renovation projects 68 Milestone Publication of calls Q2 2022 residential renovation grant Climate as well the requirement to achieve that achieve an improvement of energy buildings an improvement of energy efficiency efficiency or, in the case of complete or, in the case of complete renovations, at least the energy efficiency class renovations, at least the energy C. The results shall be certified by ex-ante and efficiency class C; ex-post SA KredEx Energy Performance b) the process of obtaining and calculations. presenting ex-ante and ex-post Energy Performance Certificates. Summary document duly justifying At least 80 dwellings shall be renovated, and how the target (including all the achieve an improvement of energy efficiency or, constitutive elements) has been in the case of complete renovations, at least the satisfactorily fulfilled. energy efficiency class C. The results shall be This document shall include as an certified by ex-ante and ex-post KredEx Energy 4.3 Support for the annex a list of dwellings with, for Performance calculations. Dwellings with renovation of small Number of Ministry of each dwelling: 69 Target improved energy 0 80 Q4 2024 residential dwellings Climate a) a unique identifier performance buildings b) the date of completion of the renovation, c) the ex-ante and ex-post KredEx Energy Performance calculation, and if available the reference numbers of the 33 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation energy performance certificates before and after the renovation. Summary document duly justifying At least 900 dwellings shall be renovated and how the target (including all the achieve an improvement of energy efficiency or, constitutive elements) was in the case of complete renovations, at least the satisfactorily fulfilled. energy efficiency class C. The results shall be This document shall include as an certified by ex-ante and ex-post KredEx Energy annex a list of dwellings with, for Performance calculations. each dwelling: a) a unique identifier 4.3 Support for the Dwellings with b) the date of completion of the renovation of small Number of Ministry of 69a Target improved energy 80 900 Q1 2026 renovation residential dwellings Climate performance c) The renovation actions carried buildings out, d) the ex-ante and ex-post KredEx Energy Performance calculation, and if available the reference numbers of the energy performance certificates before and after the renovation. Copy of the Government decision The Government shall adopt a decision on Government decision on investments needed to alleviate making the necessary investments to alleviate 4.4 Boosting the on investments the defence related height the defence related height restrictions on wind Adoption of the green transition in needed to alleviate Ministry of restrictions on wind parks, parks. 70 Milestone decision of the Q2 2021 the energy the defence related Climate accompanied by a document duly Government economy height restrictions on justifying how the milestone wind parks (including all the constitutive elements) was satisfactorily fulfilled. Government decision on the Government decision on initiating the Adoption of the initiation of the preparation process preparation process of the National decision of the of the National Development Plan of Development Plan of the Energy Sector shall be Government on the 4.4 Boosting the the Energy Sector, defining the approved, defining the responsible entity (ies) initiation of the Adoption of the green transition in Ministry of responsible entity(ies) and setting and setting the relevant deadlines. The 71 Milestone preparation process decision of the Q4 2021 the energy Climate the relevant deadlines, and development plan shall address, inter alia, the of the National Government economy reference to the relevant provisions objectives of increasing renewable energy Development Plan of indicating the entry into force, production, energy efficiency and maintaining the Energy Sector, accompanied by a document duly and improving security of supply, as well as the the designation of justifying how the milestone cessation of the use of oil shale for electricity 34 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation those responsible (including all the constitutive production in 2035 and the phasing out of shale and deadlines elements) was satisfactorily fulfilled. oil production by 2040. Summary document duly justifying Guidance materials necessary for facilitating how the target (including all the and incentivising the installation of renewable constitutive elements) has been energy generating installations and energy satisfactorily fulfilled. storage facilities shall be published and relevant Entry into force of the This document shall include as an primary and/or secondary legislation shall enter relevant primary Provision in the annex the following documentary into force to remove the barriers to installation of and/or secondary law indicating the evidence: renewable energy facilities such as streamlining legislation and entry into force of a) if relevant, a copy of the permitting procedures and other relevant publication of 4.4 Boosting the the relevant publication in the Official Journal of identified barriers. guidance material to green transition in primary and/or Ministry of the relevant primary and/or 72 Milestone alleviate the barriers Q4 2024 the energy entry into force of Climate secondary legislation, and reference for the installation of economy secondary to the relevant provisions indicating renewable energy legislation and the entry into force; generating publication of b) if relevant, a copy of the installations and guidance material publication of guidance material energy storage necessary for facilitating and facilities incentivising the installation of renewable energy generating installations and energy storage facilities Copy of the National Development The National Development Plan of the Energy Plan of the Energy Sector as Sector shall be approved by the Government. approved by the Government, The plan shall include the actions related to the accompanied by a document duly phase-out of the use of oil shale for electricity justifying how the milestone production in 2035 and of shale oil production by Adoption of the (including all the constitutive 2040. It shall also include targets for electricity 4.4 Boosting the National elements) was satisfactorily fulfilled, generation capacity to be replaced with green transition in Document adopted Ministry of 73 Milestone Development Plan of Q4 2025 in particular, how the actions and renewable energy. the energy by the Government Climate the Energy Sector by targets included in the plan economy the Government contribute to the phase-out of the use of oil shale for electricity production in 2035 and of shale oil production by 2040 and for electricity generation capacity to be replaced with renewable energy. 35 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation 4.5 Programme Summary document duly justifying A co-financing agreement for electricity network to strengthen the how the milestone (including all the investments shall be concluded between the electricity grid constitutive elements) has been Ministry of Economic Affairs and to increase satisfactorily fulfilled. Communications and Elering AS. The contract Signature of network renewable Signature of a This document shall include as an shall set out the expected results and deadlines. investment energy contract with the Ministry of annex a copy of the co-financing 74 Milestone cofinancing contract Q1 2022 production transmission Climate agreement for electricity network with transmission capacity and system operator investments between the Ministry of system operator adapt to climate Economic Affairs and change (such as Communications and Elering AS protection setting out the expected results and against storms) deadlines. Summary document duly justifying Increase in the capacity of the Estonian how the target (including all the electricity transmission network by at least 310 constitutive elements) was MW. 4.5 Programme satisfactorily fulfilled. to strengthen the This document shall include as an electricity grid annex the following documentary to increase evidence: renewable Additional grid a) certificates of completion signed energy capacity created via Additional grid Ministry of by the contractor and Elering AS 75 Target 0 310 Q2 2026 production investments into the capacity (MW) Climate demonstrating that the projects capacity and transmission network have been completed, are adapt to climate operational and in line with the change (such as requirements of the target; protection b) documents signed by Elering AS against storms) verifying that the grid capacities in the Estonian electricity transmission network have increased by at least 310 MW overall. Summary document duly justifying An open call shall be published by the how the milestone (including all the Environmental Investment Centre to support the constitutive elements) has been grid connection costs of companies producing Publication of a call ““in industrial satisfactorily fulfilled. electricity from renewable sources in industrial 4.6 Programme for proposals for sites” shall be This document shall include as an sites. to boost energy Call for proposals Ministry of 76 Milestone projects boosting Q4 2022 understood as annex a copy of the call for The call shall be based on project selection production in published Climate energy production in “in or near proposals containing the selection criteria and award conditions that ensure that industrial areas industrial sites industrial sites” criteria that ensure compliance with the selected projects comply with the ‘Do no the ‘Do no significant harm’ significant harm’ Technical Guidance Technical Guidance (2021/C58/01), (2021/C58/01) through the use of an exclusion as specified in the CID Annex. list and the requirement of compliance with the 36 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation In the case of ETS installations, this relevant EU and national environmental document shall contain the following legislation. information: 1) a unique identifier, the name, the location, the Installation ID/Aircraft Operator ID in the European Union Transaction Log (EUTL) as established by Art. 5 of the Commission Regulation (EU) 389/2013; 2) the projected level of GHG emissions per unit of product for awarded projects with activities under the EU ETS; 3) brief description of the project and technologies used. In case the projected GHG emissions are not expected to decrease to significantly below benchmark, an explanation of the reasons why this is not possible should be provided. Summary document duly justifying Additional connection capacity for renewable how the target (including all the electricity production in or near industrial sites constitutive elements) was constructed for at least 28 MW. satisfactorily fulfilled. This document shall include as an Additional connection annex certificates of completion 4.6 Programme capacity for signed by the relevant entities i) Connection to boost energy renewable electricity Ministry of demonstrating that the projects 77 Target capacity created 0 28 Q2 2026 production in production in or near Climate have been completed, are (MW) industrial areas industrial sites operational and in line with the connected to the grid requirements of the target; and ii) certifying that additional connection capacity for renewable electricity production in or near industrial sites has been constructed for at least 28 MW. 37 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Summary document duly justifying An open call for proposals shall be published by how the milestone (including all the the Environmental Investment Centre to support constitutive elements) has been energy storage projects. satisfactorily fulfilled. The call shall be based on project selection This document shall include as an criteria and award conditions that ensure that annex a copy of the publication of the selected projects comply with the ‘Do no the call for proposals demonstrating significant harm’ Technical Guidance Publication of a call 4.7 Pilot Energy alignment with the requirements of (2021/C58/01) through the use of an exclusion for proposals for a Call for proposals Ministry of 78 Storage Milestone Q4 2022 the description of the milestone and, list and the requirement of compliance with the pilot energy storage published Climate Programme in particular, containing the relevant EU and national environmental programme selection criteria that ensure legislation. The selection/eligibility criteria shall compliance with the ‘Do no specify that the supported activities and/or significant harm’ Technical enterprises contribute to climate-neutral Guidance (2021/C58/01), as economy, climate resilience and climate change specified in the CID Annex as well adaptation, including circular economy as with provisions on ownership and objectives. operation of storage facilities. Summary document duly justifying The investment support scheme shall result in how the target (including all the the installation of heat storage of at least 35 000 constitutive elements) was m³ in district heating systems. satisfactorily fulfilled. This document shall include as an Additional heat annex certificates of completion 4.7 Pilot Energy storage capacity Capacity Ministry of signed by the relevant entities i) 79 Storage Target 0 35 000 Q2 2026 resulting from installed (m³) Climate demonstrating that the projects Programme investment support have been completed, are operational and in line with the requirements of the target; and ii) certifying installation of heat storage of at least 35 000 m³ in district heating systems. Summary document duly justifying The investment support scheme shall result in how the target (including all the the installation of at least 4 MW of electricity constitutive elements) was storage capacity. satisfactorily fulfilled. Additional electricity 4.7 Pilot Energy This document shall include as an storage capacity Capacity Ministry of 80 Storage Target 0 4 Q2 2026 annex the certificates of completion resulting from installed (MW) Climate Programme signed by the relevant entities: investment support i) demonstrating that the projects have been completed, are operational and in line with the requirements of the target; and 38 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation ii) certifying the installation of at least 4 MW of electricity storage capacity. Summary document duly justifying Contracts signed for the detailed design, air how the milestone (including all the surveillance radar, passive radar constitutive elements) was system/sensors, civil engineering construction satisfactorily fulfilled. works and radar construction works. The This document shall include as an contractors shall be selected on the basis of a annex the following documentary call for tenders. evidence: a) copy of the publication of the call for tenders demonstrating Contractors for the alignment with the 4.8 Boosting radar and passive Ministy of requirements of the 80a offshore wind Milestone radar system/sensors Contracts signed Q4 2024 Defence description of the milestone farms development selected and and the corresponding contracts signed measure; b) the signed contracts for the radar and passive systems certifying the detailed design, air surveillance radar, passive radar system/sensors, civil engineering construction works and radar construction works. Summary document duly justifying The radar and passive radar system/sensors how the milestone (including all the shall be operational. constitutive elements) was satisfactorily fulfilled. 4.8 Boosting Radar and passive This document shall include as an Date of the start of Ministy of 80b offshore wind Milestone radar system/sensors Q1 2026 annex the certificate of completion operations Defence farms development become operational signed by the contractor and the competent authority certifying that the radar and passive systems/sensors are operational. 39 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Summary document duly justifying A Notice issued by the Ministry of Defence and how the milestone (including all the published on its website, stating that the height constitutive elements) was restrictions on offshore wind turbines have been satisfactorily fulfilled. lifted in the Gulf of Riga and Estonian islands of Removal of the This document shall include as an Hiiumaa, Saaremaa and Vormsi. height restriction on annex the copy of the Notice issued 4.8 Boosting offshore wind Ministy of by the Ministry of Defence lifting the 80c offshore wind Milestone turbines in the Gulf of Notice Q1 2026 Defence height restrictions on offshore wind farms development Riga and Estonian turbines in the Gulf of Riga and islands Hiiumaa, Estonian islands Hiiumaa, Saaremaa, Vormsi Saaremaa, Vormsi and the link to the website of the Ministry of Defence where the Notice can be accessed. Summary document duly justifying The Transport and Mobility Development Plan how the milestone (including all the 2021-2035 shall be approved by the constitutive elements) was Government. It shall include the creation of the satisfactorily fulfilled. Tallinn capital region common transport system, This document shall include as an actions to facilitate uptake of local biomethane, 5.1 Deployment of annex the Transport and Mobility actions to develop sustainable and active urban safe, green, Development Plan 2021-2035 as mobility in bigger towns following the logic of Adoption of the Adoption of the competitive, approved by the Government. integrated transport corridors, planning Transport and Transport and needs-based and Ministry of multimodal infrastructure, increasing the 81 Milestone Mobility Development Mobility Q1 2022 sustainable Climate connections, speed and safety of rail, making Plan 2021-2035 by Development Plan transport and the maritime transport sector more competitive the Government 2021-2035 energy and greener and connect it multimodally, infrastructure developing faster and safer road transport. The plan shall include a target to reduce CO2 emissions by 700 000 tons (or 30%) compared to 2018 levels and reach a share of renewables in the energy consumed in the transport sector of 24% by 2035. 40 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Summary document duly justifying The implementation plan shall be approved by how the milestone (including all the the Steering Committee of the Transport and constitutive elements) was Mobility Development Plan 2021-2035. satisfactorily fulfilled. It shall include the creation of the Tallinn capital This document shall include as an region common transport system, actions to annex a copy of the adopted facilitate uptake of local biomethane, actions to 5.1 Deployment of Adoption of the implementation plan. develop sustainable and active urban mobility in safe, green, Implementation Plan bigger towns following the logic of integrated competitive, for green sustainable transport corridors, planning multimodal Adoption of the infrastructure, increasing the connections, speed needs-based and public transport Ministry of 82 Milestone Implementation Q4 2022 and safety of rail, making the maritime transport sustainable development of the Climate Plan sector more competitive, greener and connect it transport and Transport and energy Mobility Development multimodally, developing faster and safer road infrastructure Plan 2021-2035 transport. The implementation plan shall include an annual reporting obligation on the responsible minister to the Government. Summary document duly justifying The implementation of key measures of the how the milestone (including all the Transport and Mobility Development Plan shall constitutive elements) was be completed, including building and extending satisfactorily fulfilled. the electrified railway lines from Tallinn to Tartu This document shall include as an and harmonising the public transport system in annex the following documentary the Tallinn capital region (including common 5.1 Deployment of Implementation of evidence: ticketing and pricing systems). safe, green, several key a) certificate of completion signed competitive, Implementation of measures of the by the contractor and the competent needs-based and Transport and Transport and Ministry of authority demonstrating which 83 Milestone Q2 2026 sustainable Mobility Development Mobility Climate sections of the electrified railway transport and Plan 2021-2035 Development Plan lines from Tallinn to Tartu have energy 2021-2035 been built or extended in line with infrastructure completed the requirements of the milestone; b) a copy of the description of the new common ticketing and pricing system for public transport in the Tallinn capital region (e.g. user guide, passenger information), which has been distributed on paper 41 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation or made available online to users of the Tallinn transport system; c) copies of any arrangements (e.g. contracts, MoU) among the parties involved, i.e. public transport authorities and service providers, on the sharing of costs and revenues etc. Summary document duly justifying The contract for the building of the how the milestone (including all the multifunctional work vessel shall be signed by constitutive elements) was the contractor and the National Fleet satisfactorily fulfilled. (Riigilaevastik). The contract shall include a This document shall include as an specification of the fuel to be used by the vessel annex the contract and its annex in line with ‘Do No Significant Harm’ signed by the contractor and the requirements set out in the description of the 5.2.a Contract signed for Ministry of National Fleet (Riigilaevastik), investment. 84a Multifunctional Milestone Contract signed Q1 2024 building of the vessel Climate containing the specification of the work vessel fuel to be used by the vessel that ensures compliance with the ‘Do no significant harm’ Technical Guidance (2021/C58/01), as specified in the CID Annex. Summary document duly justifying The multifunctional work vessel shall be how the milestone (including all the delivered in line with the description, criteria and constitutive elements) was conditions as set out in the description of the satisfactorily fulfilled. investment, and it shall be accepted by the This document shall include as an National Fleet (Riigilaevastik). annex the following documentary evidence: 5.2.a a) the certificate of completion Vessel delivered Ministry of 85a Multifunctional Milestone Vessel delivered Q2 2026 signed by the contractor and the and accepted Climate work vessel contracting authority, containing evidence that the vessel has been delivered in line with the description, criteria and conditions as set out in the CID Annex; b) the certificate of acceptance by the contracting authority the National Fleet (Riigilaevastik) 42 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation demonstrating that the multifunctional work vessel has been completed, is operational and in line with the requirements of the milestone. Summary document duly justifying Works contracts signed for the following Rail how the milestone (including all the Baltic viaducts: Kangru viaduct, Raudalu constitutive elements) was viaduct, Raku viaduct, Männiku light traffic satisfactorily fulfilled. viaduct and Männiku light traffic tunnel. This document shall include as an annex copies of the contracts signed by the competent authority 5.3.a Construction Works contracts for Works contracts Ministry of and the contractor for the 86a of the Rail Baltic Milestone the construction of Q3 2023 signed Climate construction of the following Rail viaducts Rail Baltic viaducts Baltic viaducts: a) Kangru viaduct, b) Raudalu viaduct, c) Raku viaduct, d) Männiku light traffic viaduct, and e) Männiku light traffic tunnel. Summary document duly justifying The construction of the following Rail Baltic how the target (including all the viaducts has been completed and accepted by constitutive elements) was the contracting authority: Kangru viaduct, satisfactorily fulfilled. Raudalu viaduct, Raku viaduct, Männiku light This document shall include as an traffic viaduct and Männiku light traffic tunnel. annex the certificates of completion signed by the contractor and a 5.3.a Construction Ministry of Number of certificate of acceptance issued by 87a of the Rail Baltic Target Viaducts completed 0 5 Q1 2026 Climate viaducts the contracting authority for viaducts a) Kangru viaduct, b) Raudalu viaduct, c) Raku viaduct, d) Männiku light traffic viaduct and e) Männiku light traffic tunnel Summary document duly justifying Tallinn Urban Planning and Utilities Board shall 5.4 Construction of Completion of the Approval of the Ministry of how the milestone (including all the adopt the design of the tramway construction 89 the Tallinn Old Port Milestone tramway construction Q4 2021 project design Climate constitutive elements) was project. tram line project design satisfactorily fulfilled. 43 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation This document shall include as an annex the certificate of adoption of the project design for the construction of the Tallinn Old Port tramline between Gonsiori street and Põhja Puiestee, issued by the Tallinn Urban Planning and Utilities Board. Summary document duly justifying Works contract concluded between Tallinn how the milestone (including all the Urban Planning and Utilities Board and the constitutive elements) was contractor for the construction of the tramway 5.4 Construction of Contract signed for satisfactorily fulfilled. line between Gonsiori street and Põhja Puiestee Award of works Ministry of 90 the Tallinn Old Port Milestone the construction of Q2 2022 This document shall include as an contract Climate tram line the tramway line annex the signed contract for the construction of the tramway line between Gonsiori street and Põhja Puiestee. Summary document duly justifying The tramway section of 2500 meters in length how the target (including all the shall be completed and put into service in constitutive elements) was accordance with the letter authorisation issued satisfactorily fulfilled. by the City of Tallinn This document shall include as an 5.4 Construction of New tramway line in Meters of Ministry of annex the certificates of completion 91 the Tallinn Old Port Target 0 2500 Q4 2025 operation tramway line Climate signed by the contractor and the tram line competent authority demonstrating that the project has been completed, is operational and is in line with the requirements of the target. Summary document duly justifying An open call for investment by municipalities in how the milestone (including all the bike- and walkways shall be published. constitutive elements) was satisfactorily fulfilled. 5.5 Municipalities’ Publication of the This document shall include as an Ministry of investments in Call for proposals for notice for call for annex the following documentary 92 Milestone Q4 2022 Regional Affairs bike- and grants proposals for evidence: and Agriculture walkways grants a) copy and link to the Regulation of Minister of Public Administration on terms and conditions for measure “Municipalities’ investments in bike- and/or walkways” as published in 44 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation the Official Journal (www.riigiteataja.ee) b) link to website of the state Shared Service Centre (Riigi Tugiteenuste Keskus) to the information of the open call; c) copy of public press release with notice for call for proposal for grants. Summary document duly justifying At least 24 kilometres of bike and walkways how the target (including all the shall be built as a result of the support scheme. constitutive elements) was These shall generally be new ways. In justified 5.5 Municipalities’ Bike- and walkways Ministry of satisfactorily fulfilled, including cases, the reconstruction of existing bike- and investments in Km of bike- and 93 Target infrastructure 0 24 Q4 2025 Regional Affairs extracts from the electronic register walkways shall be allowed, such as if the width bike- and walkways completed and Agriculture “e-toetus” of the certificates of of the existing walkway does not meet the walkways completion (or equivalent evidence) standards, making it impossible for walkers and of the bike- and/or walkways. cyclists to move simultaneously in a safe and non-interference manner. Copy of the publication in the Entry into force of the Government Order which Official Journal of the legislation on shall lay down: the Hospital network development - the list of regional, central, local and 6.1 A Entry into force of the roadmap and reference to the rehabilitation hospitals in order to ensure equal comprehensive Government Order Entry into force of relevant provisions indicating the access to health care services; change in the Ministry of 94 Milestone on the Hospital the Government Q4 2024 entry into force, accompanied by a - the requirements, objectives and steps to be organisation of Social Affairs network development Order summary document duly justifying taken for consolidating the hospital network; health care in roadmap how the milestone (including all the - the necessary investments for the construction, Estonia constitutive elements) was renovation and satisfactorily fulfilled. reprofiling of the hospitals included in the list of hospitals. Summary document duly justifying The Strategic Framework for addressing health how the milestone (including all the workforce shortages shall outline: Approval of the constitutive elements) was - measures on the organisation of health care 6.1 A Strategic satisfactorily fulfilled. services in the different health sectors, in comprehensive Approval of the Framework for This document shall include as an particular specialised care, change in the Strategic Framework addressing health Ministry of 95 Milestone Q4 2022 annex the copy of the adopted - allocation of physical and human resources to organisation of for addressing health workforce Social Affairs Strategic Framework for addressing ensure the provision of health care throughout health care in workforce shortages shortages by the health workforce shortages and a the territory, Estonia Minister of Health link to the website where the - financing, governance and information and Labour Strategic Framework can be exchange mechanisms that ensure performance accessed. throughout the country. 45 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Copy of the publication in the Entry into force of the Decrees of the Minister of Official Journal of the Decrees of Health and Labour which shall improve the the Minister of Health and Labour reimbursement system for doctors and Entry into force of the on (a) amending the reimbursement pharmacists to incentivise the health workforce 6.1 A Decrees of the system for doctors, and (b) to work in remote areas. comprehensive Minister of Health Entry into force of amending the reimbursement change in the and Labour the Decrees of the Ministry of system for pharmacists, and a 96 Milestone Q1 2023 organisation of amending the Minister of Health Social Affairs reference to the relevant provisions health care in reimbursement and Labour indicating the entry into force of the Estonia system for doctors Decrees, accompanied by a and pharmacists summary document duly justifying how the milestone (including all the constitutive elements) was satisfactorily fulfilled. Copy of the publication in the Entry into force of the Decree of the Minister of Official Journal of Health and Labour and the amendment to the Entry into force of the a) the Decree of the Minister of Health Services Organisations Act which shall Decree of the Entry into force of Health and Labour and establish the reimbursement system for nurses 6.1 A Minister of Health the Decree of the b) the amendment to the Health to incentivise them to work in remote areas. This comprehensive and Labour and the Minister of Health Services Organisation Act reimbursement system shall cover general and change in the amendment to the and Labour and of Ministry of establishing the reimbursement advanced practice nurses, in primary health 96a Milestone Q2 2024 organisation of Health Services the amendment to Social Affairs system for nurses and reference to care and hospitals. health care in Organisations Act the Health the relevant provisions indicating Estonia establishing the Services the entry into force, accompanied by reimbursement Organisations Act a summary document duly justifying system for nurses how the milestone (including all the constitutive elements) was satisfactorily fulfilled. Summary document duly justifying The admission of persons to nursing training how the target (including all the has been increased by 5% compared to 2020. 6.1 A Percentage constitutive elements) was comprehensive increase in the satisfactorily fulfilled. change in the Admission to nursing number of Ministry of 97 Target 0 5 Q4 2023 This document shall include as an organisation of training persons Social Affairs annex the (anonymised) annual health care in admitted to admission rolls of nursing training Estonia nursing training providers for the years 2020, 2021, 2022 and 2023. Entry into force of the Entry into force of Copy of the publication in the Entry into force of the Ministerial Regulation 6.1 A Ministerial Regulation the Ministerial Official Journal of the Ministerial amending the agreement between the Ministry comprehensive Ministry of 98 Milestone amending the Regulation and Q2 2026 Regulation on amending the of Social Affairs and the University of Tartu change in the Social Affairs agreement between agreement agreement between the Ministry of which shall lay down the requirements for the organisation of the Ministry of Social between the Social Affairs and the University of gradual increase of admission in certain 46 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation health care in Affairs and the Ministry of Social Tartu and reference to the relevant professions with shortages, in particular general Estonia University of Tartu on Affairs and the provisions indicating the entry into practitioners, psychiatrists, internal diseases. the shortage of University of Tartu force, accompanied by a summary doctors in certain document duly justifying how the specialisations milestone (including all the constitutive elements) was satisfactorily fulfilled. Summary document duly justifying The Riigi Kinnisvara AS (the representative of how the milestone (including all the the Viljandi Haigla) and the contractor shall sign constitutive elements) was a contract for the construction of TERVIKUM, satisfactorily fulfilled. including the installation of the technical building This document shall include as an systems, in particular the technical equipment Signature of the annex a copy of the contract signed for heating, cooling, ventilation, hot water, 6.2.a Ministry of contract for the Signature of the by Riigi Kinnisvara AS (the lighting and electricity production, measurement, 99a Construction of Milestone Q2 2023 Social Affairs construction of contract representative of the Viljandi Haigla) monitoring and control systems and interior TERVIKUM TERVIKUM and the contractor for the works. construction of TERVIKUM including annex(es) containing the technical specifications of the projects proving that it is in line with the requirements of the milestone. Summary document duly justifying The construction of the TERVIKUM, consisting how the milestone (including all the of a general hospital and primary health care constitutive elements) was centre, shall be completed, and the building satisfactorily fulfilled. shall be supplied with the equipment necessary This document shall include as an to make the TERVIKUM operational. annex a copy of the certificates of TERVIKUM Ministry of completion signed by the contractor 6.2.a Construction TERVIKUM 100a Milestone constructed and Q4 2025 Social Affairs and the contracting authority for of TERVIKUM constructed equipped (a) the construction work for TERVIKUM, consisting of a general hospital and primary health care centre and (b) the equipment necessary to make the TERVIKUM operational Entry into force of the Copy of the publication in the Entry into force of legislative amendments which Entry into force of Decree of the Official Journal of the Decree of the shall improve the access to specialised care by legislative 6.3 Strengthening Government, which Ministry of Government on amending the list of extending the use of e-consultation in primary 106 Milestone amendments to the Q3 2020 primary health care amends the list of Social Affairs health care services of the Estonian care allowing patients to be advised by a Decree of the health care services Health Insurance Fund and specialist without having to consult them face-to- Government of the Estonian reference to the relevant provisions face. 47 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Health Insurance indicating the entry into force, Fund on access to accompanied by a summary specialised medical document duly justifying how the care milestone (including all the constitutive elements) was satisfactorily fulfilled. Copy of the publication in the Legislative amendments shall enter into force Entry into force of Official Journal of the Decree of the providing for the financing of fixed costs and amendments to the Government amending the list of services for general practitioners in order to Decree of the health care services of the Estonian increase the allocation of resources to primary Government which Entry into force of Health Insurance Fund and medical practice outside metropolitan areas, amends the list of the legislative 6.3 Strengthening Ministry of reference to the relevant provisions especially in remote areas, and to increase 107 Milestone health care services amendments to the Q1 2021 primary health care Social Affairs indicating the entry into force, patients’ access to diagnostic and screening of the Estonian Decree of the accompanied by a summary services. Health Insurance Government document duly justifying how the Fund on costs and milestone (including all the services of general constitutive elements) was practitioners satisfactorily fulfilled. Copy of the publication in the Entry into force of the amendments to Health Official Journal of the legislation on Services Organisation Act which shall amend amendments to the Health Services the management of the list of patients, ensure Entry into force of Provision in the Organisation Act and reference to continuity of primary care and extend the rights 6.3 Strengthening amendments to the law indicating the Ministry of the relevant provisions indicating of nurses to prescribe medicines to patients. 108 Milestone Q1 2023 primary health care Health Services entry into force of Social Affairs the entry into force, accompanied by Organisation Act the law a summary document duly justifying how the milestone (including all the constitutive elements) was satisfactorily fulfilled. Approval of the Summary document duly justifying Approval of the proposal on the Governance proposal on the how the milestone (including all the Framework and implementation roadmap which eHealth constitutive elements) was shall update the governance framework for Approval of the Governance satisfactorily fulfilled. eHealth and the coordination of the 6.4 Renewal of the eHealth Governance Framework and This document shall include as an development of eHealth services. Ministry of 109 eHealth Milestone Framework and its implementation Q2 2023 annex the copy of the adopted Social Affairs Governance implementation roadmap by the eHealth Governance Framework roadmap Steering and its implementation roadmap Committee of the and a link to the website where the “Eesti tervise IKT Framework and the roadmap can be juhtimise raamistik” accessed. 48 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Link to the website where the Entry into force of the Decree of the Minister of legislation of strengthening the “My Health and Labour which shall define the Entry into force of the First Job” scheme can be accessed characteristics of the scheme and the conditions 6.6 Providing Decree of the Entry into force of Ministry of and reference to the relevant for its implementation, including financing and labour market Minister of Health the Decree of the Economic provisions indicating the entry into target group. The aim of the scheme shall be to 113 measures to Milestone Q1 2022 and Labour to Minister of Health Affairs and force, accompanied by a summary enable young people without work experience or reduce youth strengthen the “My and Labour Communications document duly justifying how the with little work experience to gain work unemployment First Job” scheme milestone (including all the experience and to improve their skills to constitutive elements) was participate in the labour market. satisfactorily fulfilled. Summary document duly justifying The Government shall adopt an amended Youth how the milestone (including all the Guarantee Action Plan to support youth constitutive elements) was employment. This action plan shall 6.6 Providing Adoption of the Ministry of satisfactorily fulfilled. - include measures to improve the skills of labour market reinforced Youth Youth Guarantee Economic This document shall include as an young people, 114 measures to Milestone Guarantee Action Q2 2022 Action Plan Affairs and annex the copy of the adopted - define actions to prevent and address youth reduce youth Plan by the Communications Youth Guarantee Action Plan and a unemployment, including outreach and unemployment Government link to the website where the action prevention of NEET-situation plan can be accessed. - define key parties and their roles of preventing and dealing with youth unemployment. Summary document duly justifying At least 3 178 young people aged 16-29 have how the target (including all the participated in the “My First Job” scheme constitutive elements) was (cumulative number of entrants). satisfactorily fulfilled. This document shall include as an annex the following documentary evidence: Ministry of a) an extract of the register 6.6 Providing Economic containing the identification number Number of young labour market Affairs and of the individual contracts signed people participating Number of 115 measures to Target 0 3178 Q4 2025 Communications between the Unemployment in the “My First Job” participants reduce youth Insurance Fund and the employer scheme unemployment Unemployment proving alignment with the Insurance Fund description of the target in the CID annex; b) an extract of the register containing the individual training reimbursement decisions by the Unemployment Insurance Fund; c) summary of the training, including its content. 49 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Alongside the Copy of the publication in the Entry into force of the amendments to the Act NAIRU/NAWRU, Official Journal of the legislation on which shall lay down a permanent mechanism to other reference the amendments to the activate the extension of the duration of unemployment Unemployment Services and unemployment insurance benefits by 60 days, rates (such as Benefits Act and the Unemployment notably when the registered unemployment rate multi-year Insurance Act and reference to the exceeds the non-accelerating inflation/wage rate moving relevant provisions indicating the of unemployment by a significant margin. The Entry into force of the averages) may entry into force, accompanied by a mechanism of prolongation and the margin, amendments to the 6.7 Extending the Ministry of also be used as summary document duly justifying which shall not be higher than 2%, shall be Unemployment Entry into force of duration of Economic benchmarks for how the milestone (including all the agreed upon in dialogue with the social partners. 116 Milestone Services and the legislative Q2 2023 unemployment Affairs and activating the constitutive elements) was Benefits Act and the amendments insurance benefits Communications extension, satisfactorily fulfilled. Unemployment based on the Insurance Act result of the consultation with social partners as reported under interim step 116.1 in Annex II. Copy of the publication in the Entry into force of legislative amendments to the Official Journal of the legislation on Social Welfare Act which shall lay down the the amendments to the Social concept of long-term care and require local Welfare Act and reference to the authorities to take into account the principle that Entry into force of Entry into force of Ministry of relevant provisions indicating the a person must be able to live as long as 117 6.8 Long-term care Milestone amendments to the legislative Q2 2022 Social Affairs entry into force, accompanied by a possible in his or her home, in his or her usual Social Welfare Act amendments summary document duly justifying environment, with sufficient quality services how the milestone (including all the available. constitutive elements) was satisfactorily fulfilled. Summary document duly justifying The Ministry of Social Affairs shall adopt an how the milestone (including all the Action Plan that provides for the establishment constitutive elements) was of an integrated care model throughout Estonia satisfactorily fulfilled. and the roles and responsibilities of the actors Action Plan on an Adoption of the Ministry of This document shall include as an involved in the future financing model of the 118 6.8 Long-term care Milestone integrated care Q4 2022 Action Plan Social Affairs annex the copy of the adopted system. model Action Plan on an integrated care model and a link to the website where the action plan can be accessed. 50 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Copy of the publication in the The Decree of the Minister of Social Protection Official Journal of the Decree of the shall define the design and characteristics of Minister of Social Protection on the services by local authorities to people with lower design, characteristics and care needs, as well as the conditions of their conditions for the local authorities implementation. In particular, it shall include Entry into force of on how to provide independent investments and development of services by Entry into force of the the decree of the Ministry of living for elderly in supported living local authorities to provide for independent living 119 6.8 Long-term care Milestone decree of the Minister Q4 2024 Minister of Social Social Affairs service and reference to the for older people with lower care needs and of Social Protection Protection relevant provisions indicating the people with disabilities to support independent entry into force, accompanied by a living. summary document duly justifying how the milestone (including all the constitutive elements) was satisfactorily fulfilled. Copy of the publication in the Entry into force of legislative amendments which Official Journal of the Social Welfare shall provide for the modernisation and Act on amendments of the support integration of services for children with higher Entry into force of the system for children with higher care care needs. In particular, legislative needs and reference to the relevant - services in the health, education, social Entry into force of amendments of the Ministry of provisions indicating the entry into protection and employment areas shall be 120 6.8 Long-term care Milestone the legislative Q1 2025 support system for Social Affairs force, accompanied by a summary integrated in order to provide comprehensive amendments children with high document duly justifying how the support for families under care burden, and care needs milestone (including all the - the current support system shall be simplified constitutive elements) was and the assessment of care needs consolidated satisfactorily fulfilled. so that parents have a secure point of contact for initial advice and support. Summary document duly justifying The Plan shall outline the measures to reduce how the milestone (including all the the gender pay gap. constitutive elements) was Adoption of the Ministry of satisfactorily fulfilled. Adoption of the 6.9 Reducing Welfare Development Economic This document shall include as an 121 Milestone Welfare Q1 2024 gender pay gap Plan 2023-2030 by Affairs and annex the copy of the adopted Development Plan the government Communications Welfare Development Plan 2023- 2030 and a link to the website where the Development Plan can be accessed. Summary document duly justifying A prototype of a gender pay gap tool for Developing a Ministry of how the milestone (including all the employers shall be developed with the aim of 6.9 Reducing Digital gender pay prototype of a Economic constitutive elements) was providing them with data and information 122 Milestone Q4 2022 gender pay gap gap tool gender pay gap Affairs and satisfactorily fulfilled. concerning the gender pay gap and its possible tool Communications This document shall include a reasons in their organisations and thereby confirmation by the Ministry of supporting making informed decisions and 51 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Economic Affairs and taking effective action in order to implement the Communication that the prototype of principle of equal pay and to reduce the gender a digital gender pay gap tool has pay gap. been developed and is in line with the requirements of the milestone. Summary document duly justifying The digital gender pay gap tool shall be how the milestone (including all the available to employers with the aim of providing constitutive elements) was them with data and information concerning the satisfactorily fulfilled. gender pay gap and its possible reasons in their Ministry of This document shall include a organisations and thereby supporting making Roll-out of a digital 6.9 Reducing Digital gender pay Economic confirmation by the Ministry of informed decisions and taking effective action in 123 Milestone gender pay gap Q1 2024 gender pay gap gap tool Affairs and Economic Affairs and order to implement the principle of equal pay tool Communications Communication that the digital and to reduce the gender pay gap. gender pay gap tool is operational and has been made available to employers and is in line with the requirements of the milestone. Copy of the publication in the Entry into force of the regulation establishing the Official Journal of the regulation legal framework for the implementation and Entry into force of the establishing the legal framework for monitoring of the recovery and resilience plan of Government the implementation and monitoring Estonia before the first payment request is Regulation on the Ministry of of the RRP and reference to the made. The regulation shall at least define the Monitoring and legal framework for Entry into force of Finance relevant provisions indicating the authorities involved in the implementation of the 124 implementation of Milestone the implementation government Q4 2021 entry into force, accompanied by a recovery and resilience plan of Estonia and their the plan and monitoring of the regulation State Shared summary document duly justifying tasks including the tasks of the Ministry of recovery and Service Centre how the milestone (including all the Finance, the sectoral ministries and the State resilience plan of constitutive elements) was Shared Service Center. Estonia. satisfactorily fulfilled. 52 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Summary document duly justifying A call for proposals shall be published to support how the milestone (including all the local authorities to hire experts or procure constitutive elements) was services aimed at improving administrative satisfactorily fulfilled. This document procedures, including permitting, for wind shall include as an annex thecopy of energy development. 8.1 Facilitating the Publication of the call the publication of the call for Ministry of deployment of for proposals to Publication of the proposals to support local 125 Milestone Q3 2023 Regional Affairs renewable energy support local call for proposals authorities to hire experts or procure and Agriculture sources authorities services aimed at improving administrative procedures, including permitting, for wind energy development. Copy of the publication in the Legislative amendments to streamline Official Journal of the legislative permitting, planning and environmental impact amendments to the laws as assessment processes for wind energy projects specified in the milestone shall enter into force. These shall include description, accompanied by a amending the following laws to the extent Entry into force of the summary document duly justifying necessary: the Building Code, the Water Act, amendments to the how the milestone (including all the the Planning Act, the Environmental Impact 8.1 Facilitating the relevant laws constitutive elements) has been Assessment and Environmental Management deployment of streamlining Entry into force of Ministry of satisfactorily fulfilled. This summary System Act, the Environmental Charges Act and 126 Milestone Q2 2024 renewable energy permitting, planning the amendments Climate document shall include a reference the Forest Act. sources and environmental to the relevant provisions indicating impact assessment the entry into force and to the processes provisions which fulfil the constitutive elements of the milestone, as listed in the description of the milestone and of the corresponding measure in the CID Annex 53 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Copy of the Governmental decision The government shall adopt a decision as specified in the milestone establishing wind energy priority development description, accompanied by a areas. The government shall adopt the decision summary document duly justifying on the basis of a technical report that shall have how the milestone (including all the identified priority development areas with a total constitutive elements) has been estimated potential to produce 1000 MW. satisfactorily fulfilled. This summary 8.1 Facilitating the Governmental document shall duly justify how the deployment of decision establishing Governmental Ministry of 127 Milestone Q3 2024 constitutive elements of the renewable energy priority development decision adopted Climate milestone, as listed in the sources areas for wind energy description of the milestone and of the corresponding measure in the CID Annex. The summary document shall include as an annex a copy of the technical report as specified in the description of the milestone. Summary document duly justifying 20 local authorities shall have received support how the target (including all the on the basis of the call for proposals to hire constitutive elements) was experts or procure services or by use of satisfactorily fulfilled. This document centrally procured services aimed at improving shall include as an annex the administrative procedures, including permitting, following documentary evidence: for wind energy development. (a) list of local authorities supported and the start date of the support; 8.1 Facilitating the (b) at least one copy of the Number of local Ministry of deployment of Support to local signed work contract or 128 Target authorities 0 20 Q1 2025 Regional Affairs renewable energy authorities service contract per one local supported and Agriculture sources authority indicating the assignment in line with the measure description; (c) in case relevant, evidence on the use of centrally procured services aimed at improving administrative procedures, including permitting, for wind energy development. 54 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Summary document duly justifying Signature of the co-financing agreement, for 8.2 Programme to how the milestone (including all the electricity distribution network works, between increase the constitutive elements) was the Ministry of Economic Affairs and Signature of the co- satisfactorily fulfilled. This document Communications and Elering AS for the access of financing agreement shall include as an annex the copy purpose of increasing the capacity of the renewable energy Ministry of 129 Milestone for electricity Signed agreement Q1 2024 of the co-financing agreement electricity distribution network by 160 MW. production to the Climate distribution network signed by the Ministry of Climate electricity works and Elering, as specified in the distribution network milestone description. Summary document duly justifying Electricity distribution network works shall be how the target (including all the completed and result in an increase in the constitutive elements) was capacity of the electricity distribution network by satisfactorily fulfilled. This document 160 MW. shall include as an annex the 8.2 Programme to following documentary evidence: increase the (a) the certificate of completion access of Construction finished signed by the contractor and MW of additional renewable energy and additional 160 Ministry of the contracting authority 130 Target capacity 0 160 Q1 2026 production to the MW capacity Climate confirming that the works available electricity available have been completed and the distribution specification of the target has network been met; (b) independent evidence on the increase in the capacity of the electricity distribution network by 160 MW from renewable sources. Summary document duly justifying Publication of a call for applications for grants to how the milestone (including all the support the uptake of sustainable biomethane in constitutive elements) was line with the Renewable Energy Directive (RED satisfactorily fulfilled. This document II). The call shall contain, among the selection 8.3 Increasing shall include as an annex a copy of criteria, the requirement set out in the Call for applications the published call for application for description of the investment. production and Call for Ministry of for grants to support grants to support the uptake of 131 uptake of Milestone applications Q2 2024 Regional Affairs the uptake of sustainable biomethane, containing sustainable biogas published and Agriculture biomethane the selection criteria that ensure and biomethane compliance with the Renewable Energy Directive and other requirements, as specified in the CID Annex. 55 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Summary document duly justifying The final report on the independent survey how the milestone target (including identifying the necessary regulatory, all the constitutive elements) was organisational and financial interventions to be For the satisfactorily fulfilled. This document initiated and implemented to increase the purposes of shall include as an annex the production and use of sustainable biogas and these following documentary evidence: sustainable biomethane shall be published on operational (a) a copy of the final report on the website of the Ministry of the Environment. 8.3 Increasing Independent survey arrangements, the independent survey The report shall include an estimate of the production and identifying the Publication of the the Ministry of Ministry of including an estimate of the potential for sustainable biogas and sustainable 132 uptake of Milestone necessary regulatory, final report on the Q4 2024 Environment Climate potential for sustainable biomethane as a replacement for natural gas sustainable biogas organizational and survey shall be biogas and sustainable over time on the basis of an analysis of historical and biomethane financial interventions understood as biomethane as a replacement consumption volumes and future demand. denoting for natural gas over time; Ministry of (b) a link to the website of the Climate Ministry of Climate where the final report has been published and where it can be accessed. Summary document duly justifying The government shall approve the action plan how the milestone (including all the for the production and deployment of constitutive elements) was sustainable biogas and sustainable biomethane. satisfactorily fulfilled. This document The action plan shall include a list of legislative shall include as an annex the changes and interventions necessary for following documentary evidence: increasing the production and deployment of a) copy of the decision of the sustainable biogas and sustainable biomethane. 8.3 Increasing Development of an government on the approval of the production and action plan for the Ministry of action plan for the production and 133 uptake of Milestone production and Approved plan Q2 2025 Climate deployment of sustainable biogas sustainable biogas deployment of biogas and sustainable biomethane; and biomethane and biomethane b) a copy of the approved action plan, including a list of legislative changes and interventions necessary for increasing the production and deployment of sustainable biogas and sustainable biomethane. 56 Non-Repayable Support Quantitative indicators Date for Responsibility Related measure Qualitative Further Milestone / (for targets) completion for reporting Seq. N° (reform or Name indicators specification (if Verification mechanism Milestone and target description Target and investment) (for milestones) necessary) Unit Baseline Goal Quarter Year implementation Summary document duly justifying Installed capacity for the production of how the target (including all the sustainable biomethane shall increase by at constitutive elements) was least 4 000 000 cubic metres under the support satisfactorily fulfilled. This document scheme. shall include as an annex the Increase in following documentary evidence: 8.3 Increasing installed a) copy of the documentation of the production and Installation of new production Ministry of biomethane production equipment 134 uptake of Target biomethane capacity of 0 4 000 000 Q2 2026 Regional Affairs installed; this documentation shall sustainable biogas production capacity sustainable and Agriculture either state the production capacity and biomethane biomethane in or enable calculation of the cubic metres production capacity based on the technical parameters of equipment; b) copy the Environmental Investment Centre’s (KIK) control report(s) of the supported project(s). 57 Annex II Arrangements and Timetable for Monitoring # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year 1 1.1. Digital transformation in M Call for proposals with award criteria and Publication of the notice of the call for Q2 2022 enterprises award conditions proposals 2 1.1. Digital transformation in T Award of grants Number of enterprises being 0 110 Q4 2023 enterprises awarded a grant 3.1 1.1. Interim step Award of grants Number of enterprises being 0 180 Q4 2024 awarded a grant 3 1.1. Digital transformation in T Award of grants Number of enterprises being 110 230 Q4 2025 enterprises awarded a grant 4 1.2. Development of e-construction M Adoption of international standards and best Adoption of international standards and Q4 2024 practices for the use of digital technologies in best practices construction 5 1.2. Development of e-construction M Availability of public services on the e- Entry into service of interfaces between the Q4 2025 construction platform e-construction platform and the related public services 6.1 1.2 Interim step Launch of development and prototyping Number of projects launched 0 40 Q4 2023 projects 6 1.2. Development of e-construction T Completion of development and prototyping Number of projects completed 0 102 Q4 2025 projects 7 1.3. Development of digital waybills T eFTI (electronic Freight Transport Information) Number of projects launched 0 5 Q2 2023 services platforms development 8 1.3. Development of digital waybills T eCMR (electronic Consignment Note) interface Number of projects launched 0 200 Q4 2024 services developments 58 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year 9 1.3. Development of digital waybills T Total number of projects completed Number of projects completed 0 205 Q4 2025 services 10 1.3. Development of digital waybills M Ex-post evaluation of the development and Adoption of ex-post evaluation report by Q2 2026 services deployment of the digital waybills the Ministry of Economic Affairs and Communications 11 1.4. Skills reform for the digital M Entry into force of secondary legislation setting Entry into force of secondary legislation Q2 2022 transformation of businesses out the terms of support for the development of digital skills 12 1.4. Skills reform for the digital T Enrolment in training activities Number of participants 0 500 Q4 2023 transformation of businesses 13.1 1.4. Interim step Completion of training activities Number of participants who 0 1000 Q2 2025 shall have completed their training. 13 1.4. Skills reform for the digital T Completion of training activities Number of participants 0 2000 Q2 2026 transformation of businesses 14 1.4. Skills reform for the digital T Number of new upskilling and retraining Number of curricula registered 0 5 Q4 2024 transformation of businesses modules in Estonia’s Adult training information system 15 1.4. Skills reform for the digital T Review of qualification standards for ICT Number of qualification 0 5 Q4 2024 transformation of businesses specialists. standards analysed and adapted as and if needed 16 1.5.1. Supporting the M Preparation of the development of strategies Completion of preparatory tasks Q2 2022 competitiveness of enterprises in foreign markets - Country and regional strategies 17.1 1.5.1 Interim step Launch of procurement Publication of the call for tenders, including Q3 2023 a specification of the value added expected from each study and of how the pro-active smart advice referred to in Target 18 will be achieved. 59 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year 17 1.5.1. Supporting the M Procurement of studies Signature of contracts Q2 2024 competitiveness of enterprises in foreign markets - Country and regional strategies 18 1.5.1. Supporting the T Number of country and regional export Number of strategies 0 13 Q2 2026 competitiveness of enterprises in strategies published foreign markets - Country and regional strategies 19 1.5.2. Supporting the M Preparatory analysis to define the content and Delivery of a preparatory analysis Q2 2022 competitiveness of enterprises in the locations of business centres foreign markets - Innovative business centres in key export markets 20.1 1.5.2. Interim step Number of business centres opened Number of business centres 0 4 Q3 2025 which shall have opened 20 1.5.2. Supporting the T Number of business centres opened Number of business centres 0 7 Q2 2026 competitiveness of enterprises in foreign markets - Innovative business centres in key export markets 21 1.5.3. Supporting the M Setting-up of impact groups and selection of Decisions on the composition of the impact Q2 2022 competitiveness of enterprises in destinations for global digital missions groups and the destinations of the global foreign markets - Global e-export digital missions impact groups and virtual stages 22.1 1.5.3. Interim step Number of expert contracts signed for the Number of contracts signed 0 7 Q2 2024 impact groups/global missions 22 1.5.3. Supporting the T Number of missions carried out by the global Total of number of missions 0 29 Q2 2026 competitiveness of enterprises in impact groups and number of major events in and events carried out foreign markets - Global e-export which Estonia was represented through ‘virtual impact groups and virtual stages stages’ 60 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year 23 2.1. Green transition of enterprises M Creation of a Green Transition Task Force to Set up of a task force and working groups Q4 2021 implement and monitor the green transition 23.1 2.1. Ex-post monitoring Activity report Submission of an activity report on the Q2 2023 outputs and results of the Task Force 23.2 2.1. Ex-post monitoring Activity report Submission of an activity report on the Q2 2025 outputs and results of the Task Force 24 2.1. Green transition of enterprises M Adoption of the Circular Economy Action Plan Circular Economy Action Plan adopted Q4 2022 by the Green Transition Task Force 24.1 2.1. Ex-post monitoring Implementation report Submission of a report on the Q2 2025 implementation of the Circular Economy Action Plan 25 2.2. Green skills to support the M Entry into force of secondary legislation setting Entry into force of secondary legislation Q2 2022 green transition of enterprises out the terms of support for the development of green skills 26 2.2. Green skills to support the T Number of upskilling and retraining modules Number of modules 0 5 Q4 2024 green transition of enterprises 27.1 2.2. Interim step People taking part in upskilling and retraining Number of participants 0 1400 Q2 2025 programmes 27 2.2. Green skills to support the T People taking part in upskilling and retraining Number of participants 0 2830 Q2 2026 green transition of enterprises programmes 28 2.3. Green technology development M Establishment of a working group to plan and Recruitment of a project manager and set Q4 2021 programmes set up the development programme up of a working group 28.1 2.3. Ex-post monitoring Number of stock-taking meetings undertaken Number of stock-taking 0 3 Q4 2022 by the working group, with appropriate activity meetings reports, which shall notably justify the actions selected to be supported 61 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year 29 2.3. Green technology development M Set up of the Green Technologies Contracts signed for all development Q2 2024 programmes Development Programme clusters and support measures designed and opened 30.1 2.3. Interim step Number of clusters supported through the Number of clusters 0 3 Q4 2024 Green Technology Development Programme 30 2.3. Green technology development T Number of clusters supported through the Number of clusters 0 5 Q2 2026 programmes Green Technology Development Programme 31.1 2.3. Interim step Number of startups supported through the Number of startups 0 4 Q4 2024 Green Technology Development Programme 31 2.3. Green technology development T Number of startups supported through the Number of startups 0 10 Q2 2026 programmes Green Technology Development Programme and which have received private investment 32 2.4. Modernisation of the business M Entry into force of the ministerial decree setting Entry into force of the ministerial decree Q2 2022 models in manufacturing companies out the terms and conditions of grant eligibility 33.1 2.4. Interim step Number of projects supported Number of projects 0 20 Q2 2023 33 2.4. Modernisation of the business T Number of projects supported Number of projects 0 70 Q4 2025 models in manufacturing companies 34 2.5. Deployment of resource M Publication of call for proposals for grants Publication of the notice for calls for Q2 2022 efficient green technologies proposals for grants 35 2.5. Deployment of resource T Number of projects awarded grants following 0 36 Q4 2023 Number of projects efficient green technologies the call for proposals 36 2.5. Deployment of resource T Number of projects completed Number of projects 0 36 Q2 2026 efficient green technologies 37 2.6. Green Fund M Signature of contractual agreement between Signature of contractual agreement Q4 2021 the Ministry of Economic Affairs and Communications and SmartCap 62 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year 38 2.6. Green Fund M Adoption of the investment policy document by Investment policy document adopted by Q4 2021 SmartCap SmartCap 39.1 2.6. Interim step Establishment of clear climate selection criteria Selection criteria that ensure that selected Q4 2022 for the Green Fund projects either lower GHG emissions, improve adaptation to climate change or aim to promote other environmental objectives provided in Article 9 of the Taxonomy Regulation 39.2 2.6. Interim step Volume of investments in venture capital funds Volume of invested capital (in 0 27 000 000 Q4 2023 or equity investments in enterprises EUR) 39 2.6. Green Fund T Volume of investments in venture capital funds Volume of invested capital (in 0 Q4 2024 55 000 000 or equity investments in enterprises EUR) 40 2.6. Green Fund T Volume of investments in venture capital funds Volume of invested capital (in 55 000 000 Q2 2026 90 000 000 or equity investments in enterprises EUR) 41 2.7. Creating opportunities for the M Entry into force of the ministerial decree setting Entry into force of the ministerial decree Q4 2022 uptake of renewables-based green out the terms and conditions for granting hydrogen technologies support 42 2.7. Creating opportunities for the M Procurement, installation and start of Q3 2025 Technologies and equipment for green uptake of renewables-based green operation of technologies and equipment hydrogen production hydrogen technologies 43 2.7. Creating opportunities for the T Grants allocated to renewables-based green EUR 0 49 490 000 Q2 2026 uptake of renewables-based green hydrogen technologies representing at least hydrogen technologies EUR 49.49 million 43a 2.8 Supply security investment M Publication of the notice for call for proposals Q4 2023 for grants support 43b 2.8 Supply security investment T Number of projects awarded following the call Projects awarded 0 70 Q4 2024 support for proposals 63 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year 43c 2.8 Supply security investment T 0 70 Q2 2026 Number of projects completed Projects completed support 44 3.1. Creation and development of a M Setting up a data management team in the Establishment of the necessary Q4 2021 centre of excellence for data Statistical Office, the Ministry of Economic organisational structure for coordinating governance and open data Affairs and Communications and the State data management Information System Authority 45 3.1. Creation and development of a T Completion of data quality improvement Number of projects 0 430 Q2 2025 centre of excellence for data projects governance and open data 46 3.1. Creation and development of a T Publication of datasets on the national open Number of published datasets 707 2600 Q4 2025 centre of excellence for data data portal governance and open data 47 3.2. Development of event services T Launch of personal life event services and/or Number of services which are 0 2 Q4 2022 and proactive digital public services proactive services operational for individuals 48 3.2. Development of event services T Launch of personal event services and pro- Number of services which are 2 10 Q4 2025 and proactive digital public services active services operational for individuals 49 3.3. Development of event services T Deployment of IT developments contributing to Number of projects that have 0 1 Q4 2022 and digital gateway for the implementation of the business event successfully deployed new entrepreneurs services and gateway developments online 50.1 3.3. Interim step Deployment of IT developments contributing to Number of projects that have 1 5 Q2 2024 the implementation of the business event successfully deployed new services and gateway developments online 50 3.3. Development of event services T Deployment of IT developments contributing to Number of projects that have 1 10 Q4 2025 and digital gateway for the implementation of the business event successfully deployed new entrepreneurs services and gateway developments online 51 3.4. #Bürokratt programme (national T Access to digital public services through the Number of public digital 0 1 Q2 2022 virtual assistant platform and virtual assistant platform services accessible through ecosystem) the virtual assistant 64 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year 52 3.4. #Bürokratt programme (national T Introduction of the Bürokratt virtual assistant in Number of service 0 18 Q4 2025 virtual assistant platform and digital public services environments environments ecosystem) 53 3.4. #Bürokratt programme (national T Access to digital public services through the Number of public digital 1 20 Q4 2025 virtual assistant platform and virtual assistant platform services accessible through ecosystem) the virtual assistant 54 3.5. Reconfiguration of basic digital M Development of centrally delivered/shared IT Opening of shared server hosting and Q3 2022 services and safe transition to cloud base services computer workstation services to public infrastructure authorities 55 3.5. Reconfiguration of basic digital T Deployment of national private cloud Number of information 0 10 Q4 2023 services and safe transition to cloud infrastructure by public authorities systems migrated to the infrastructure national private cloud 56 3.5. Reconfiguration of basic digital M Extension of the cloud infrastructure to the Completion of the extension of the national Q4 2023 services and safe transition to cloud data embassy private cloud to the infrastructure of infrastructure Estonia’s data embassy 57 3.5. Reconfiguration of basic digital T Migration of critical systems to the national Number of critical systems 0 10 Q4 2024 services and safe transition to cloud cloud infrastructure of the data embassy infrastructure 58 3.5. Reconfiguration of basic digital T Central security testing of public authorities’ Number of tests performed 0 16 Q4 2024 services and safe transition to cloud information systems infrastructure 59.1 3.6. Interim step Drafts of the amendment of the Money Submission to the Commission of draft Q3 2024 Laundering and Terrorist Financing Prevention laws with an explanatory document Act and of other legislative, administrative and contractual changes needed for the Centre for Strategic Analysis 59 3.6. Establishing the strategic M Entry into force of the amendment of the Provision in the law indicating the date of Q4 2024 analysis of money laundering and Money Laundering and Terrorist Financing entry into force of amended act and entry terrorist financing in Estonia Prevention Act and of other legislative, into force of other legislative, administrative and contractual changes administrative and contractual acts needed for the Centre for Strategic Analysis 65 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year 60.1 3.7 Interim step Progress report Submission to the Commission of a Q2 2025 progress report concerning the development of the new ICT system for the Centre for Strategic Analysis 60 3.7. Information system for real-time M Development of the new real-time ICT analysis Delivery of the new ICT system to the Q2 2026 strategic analysis of money system for the Centre for Strategic Analysis, Financial Intelligence Unit laundering and terrorist financing and delivery to the Financial Intelligence Unit 61 3.8. Construction of very high T Rollout of very high capacity broadband Number of sites 0 4000 Q4 2024 capacity broadband networks network to new sites 62.1 3.8. Interim step Rollout of very high capacity broadband Number of sites 4000 6000 Q4 2024 network to new sites 62 3.8. Construction of very high T Rollout of very high capacity broadband Number of sites 4000 8097 Q4 2025 capacity broadband networks network to new sites 63 4.1. Energy efficiency promotion M Conclusion of the cooperation agreement Conclusion of the cooperation agreement Q4 2022 stipulating conditions for cooperation between between SA KredEx/ Enterpise Estonia SA Kredex/Enterprise Estonia and county and county development centers development centers 64 4.1. Energy efficiency promotion M Digital tools to facilitate access to information Operational user-friendly renovation Q4 2024 on renovation including visualising the results website and pricing models of the renovation and estimating the cost of renovation have become operational 65 4.2. Support for the renovation of M Publication of calls for applications for Publication of calls for housing renovation Q2 2022 apartment buildings residential apartment buildings renovation grants grants 66.1 4.2 Interim step Grants awarded for renovation of apartment Number of dwellings for which 0 2600 Q4 2022 buildings a final grant decision has been awarded 66 4.2. Support for the renovation of T Dwellings with improved energy performance Number of dwellings 0 2600 Q4 2024 apartment buildings 66 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year 67 4.2. Support for the renovation of T Estimated annual reduction of greenhouse gas N/A tons of CO2eq/year 0 2200 Q2 2026 apartment buildings emissions 68 4.3. Support for the renovation of M Published calls for renovation grant Publication of calls Q2 2022 small residential buildings 69.1 4.3. Interim step Grants awarded for renovation of small Number of dwellings for which 0 80 Q4 2022 residential buildings a final grant decision has been awarded 69 4.3. Support for the renovation of T Dwellings with improved energy performance Number of dwellings 0 80 Q4 2024 small residential buildings 69a 4.3 Support for the renovation of T Dwellings with improved energy performance Number of dwellings 80 900 Q1 2026 small residential buildings 70 4.4. Boosting the green transition in M Government decision on investments needed Adoption of the decision of the Q2 2021 the energy economy to alleviate the defence related height Government restrictions on wind parks 70.1 4.4. Ex-post monitoring Investments carried out, height restrictions on Submission to the Commission of Q1 2026 wind parks alleviated in accordance with the information on alleviation of defence government decisions related height restrictions on wind parks 71 4.4. Boosting the green transition in M Adoption of the decision of the Government on Adoption of the decision of the Q4 2021 the energy economy the initiation of the preparation process of the Government National Development Plan of the Energy Sector, the designation of those responsible and deadlines 72.1 4.4. Interim step Results of the assessment Submission to the Commission of the Q2 2023 results of the assessment describing the current situation and identifying the changes needed (in the legislation and/or preparation of relevant guidance materials) to alleviate the barriers for the installation of renewable energy generating installations and energy storage facilities 67 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year 72 4.4. Boosting the green transition in M Entry into force of the relevant primary and/or Provision in the law indicating the entry Q4 2024 the energy economy secondary legislation and publication of into force of the relevant primary and/or guidance material to alleviate the barriers for entry into force of secondary legislation the installation of renewable energy generating and publication of guidance material installations and energy storage facilities 73.1 4.4. Interim step Draft Development Plan of the Energy Sector Submission to the Commission of the draft Q4 2024 Development Plan of the Energy Sector 73 4.4. Boosting the green transition in M Adoption of the National Development Plan of Document adopted by the Government Q4 2025 the energy economy the Energy Sector by the Government 73.2 4.4. Ex-post monitoring Progress report Submission to the Commission of a Q4 2026 progress report describing the current situation on the implementation of the National Development Plan of the Energy Sector 74 4.5. Programme to strengthen the M Signature of network investment cofinancing Signature of a contract with the Q1 2022 electricity grid to increase contract with transmission system operator transmission system operator renewable energy production capacity and adapt to climate change (such as protection against storms) 74.1 4.5. Interim step Progress report Submission to the Commission of a Q1 2025 progress report describing the works carried out by the transmission system operator 75 4.5. Programme to strengthen the T Additional grid capacity created via Additional grid capacity (MW) 0 310 Q2 2026 electricity grid to increase investments into the transmission network renewable energy production capacity and adapt to climate change (such as protection against storms) 76 4.6. Programme to boost energy M Publication of a call for proposals for projects Call for proposals published Q4 2022 production in industrial areas boosting energy production in industrial sites 68 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year 76.1 4.6.Interim step Completion of selection of projects Submission to the Commission of the list Q2 2024 and description of projects (inclunding MW to be added to the grid) 77 4.6. Programme to boost energy T Additional connection capacity for renewable Connection capacity created 0 28 Q2 2026 production in industrial areas electricity production in or near industrial sites (MW) connected to the grid 78 4.7. Pilot Energy Storage M Publication of a call for proposals for a pilot Call for proposals published Q4 2022 Programme energy storage programme 78.1 4.7. Interim step Completion of selection of projects Submission to the Commission of the list Q2 2024 and description of projects (solutions) selected for a grant 79 4.7. Pilot Energy Storage T Additional heat storage capacity resulting from Capacity installed (m³) 0 35 000 Q2 2026 Programme investment support 80 4.7. Pilot Energy Storage T Additional electricity storage capacity resulting Capacity installed (MW) 0 4 Q2 2026 Programme from investment support 80a 4.8 Boosting offshore wind farms M Contractors for the radar and passive radar Contracts signed Q4 2024 development system/sensors selected and contracts signed 80b 4.8 Boosting offshore wind farms M Radar and passive radar system/sensors Date of the start of operations Q1 2026 development become operational 80c M Removal of the height restriction on offshore Notice Q1 2026 4.8 Boosting offshore wind farms wind turbines in the Gulf of Riga and Estonian development islands Hiiumaa, Saaremaa, Vormsi 81 5.1. Deploy safe, green, M Adoption of the Transport and Mobility Adoption of the Transport and Mobility Q1 2022 competitive, needs-based and Development Plan 2021-2035 by the Development Plan 2021-2035 sustainable transport and energy Government infrastructure 82 5.1. Deploy safe, green, M Adoption of the Implementation Plan for green Adoption of the Implementation Plan Q4 2022 competitive, needs-based and sustainable public transport development of 69 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year sustainable transport and energy the Transport and Mobility Development Plan infrastructure 2021-2035 83.1 5.1 Interim step Annual report on progress with the Progress report submitted to the Q2 2023 implementation plan for green sustainable Commission public transport development 83.2 5.1 Interim step Annual report on progress with the Progress report submitted to the Q2 2024 implementation plan for green sustainable Commission public transport development 83.3 5.1 Interim step Annual report on progress with the Progress report submitted to the Q2 2025 implementation plan for green sustainable Commission public transport development 83 5.1. Deploy safe, green, M Implementation of Transport and Mobility Implementation of several key measures of Q2 2026 competitive, needs-based and Development Plan 2021-2035 the Transport and Mobility Development sustainable transport and energy Plan 2021-2035 completed infrastructure 84a 5.2.a Multifunctional work vessel M Contract signed for building of the vessel Contract signed Q1 2024 85a 5.2.a Multifunctional work vessel M Vessel delivered Vessel delivered and accepted Q2 2026 86a 5.3.a Construction of the Rail Baltic M Works contracts for the construction of Rail Works contracts signed Q3 2023 viaducts Baltic viaducts 87a 5.3.a Construction of the Rail Baltic T Viaducts completed Number of viaducts 0 5 Q1 2026 viaducts 89 5.4. Construction of the Tallinn Old M Completion of the tramway construction project Approval of the project design Q4 2021 Port tram line design 90 5.4. Construction of the Tallinn Old M Award of works contract Contract signed for the construction of the Q2 2022 Port tram line tramway line 91.1 5.4 Interim step Completion of excavation, utilities diversion Completion of heavy works e.g. Meters of tramway line 0 2500 Q4 2024 excavation, consolidation, piping and other 70 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year key structural elements of the tramline foundation 91 5.4. Construction of the Tallinn Old T New tramway line in operation Metres of tramway line 0 2500 Q4 2025 Port tram line 92 5.5. Municipalities’ investments in M Call for proposals for grants Publication of the notice for call for Q4 2022 bike- and walkways proposals for grants 93.1 5.5 Interim step Decisions on financing applications for bike- Decisions on financing applications Q4 2023 and/or walkways infrastructure adopted 93 5.5. Municipalities’ investments in T Bike- and walkways infrastructure completed Km of bike- and walkways 0 24 Q4 2025 bike- and walkways 94 6.1. A comprehensive change in the M Entry into force of the Government Order on Entry into force of the Government Order Q4 2024 organisation of health care in the Hospital network development roadmap Estonia 95 6.1. A comprehensive change in the M Approval of the Strategic Framework for Approval of the Strategic Framework for Q4 2022 organisation of health care in addressing health workforce shortages addressing health workforce shortages by Estonia the Minister of Health and Labour 95.1 6.1 Ex-post monitoring Progress report Submission of a progress report to the Q2 2025 Commission on the implementation of the actions included in the Strategic Framework addressing health workforce shortages 96 6.1 A comprehensive change in the M Entry into force of the Decrees of the Minister Entry into force of the Decrees of the Q1 2023 organisation of health care in of Health and Labour amending the Minister of Health and Labour Estonia reimbursement system for doctors and pharmacists 96a 6.1. A comprehensive change in the M Entry into force of the Decree of the Minister of Entry into force of the Decree of the Q2 2024 organisation of health care in Health and Labour and the amendment to the Minister of Health and Labour and of the Estonia Health Services Organisations Act establishing amendment to the Health Services the reimbursement system for nurses Organisations Act 71 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year 97 6.1. A comprehensive change in the T Admission to nursing training Percentage increase in the 0 5 Q4 2023 organisation of health care in number of persons admitted to Estonia nursing training 98.1 6.1. Interim step Progress report Submission of a progress report to the Q4 2023 European Commission on the negotiations between the Ministry of Social Affairs and the University of Tartu on the shortage of doctors in certain specialisations 98 6.1. A comprehensive change in the M Entry into force of the Ministerial Regulation Entry into force of the Ministerial Q2 2026 organisation of health care in amending the agreement between the Ministry Regulation and agreement between the Estonia of Social Affairs and the University of Tartu on Ministry of Social Affairs and the University the shortage of doctors in certain of Tartu specialisations 99a 6.2.a Construction of TERVIKUM M Signature of the contract for the construction of Signature of the contract Q2 2023 TERVIKUM 100a 6.2.a Construction of TERVIKUM M TERVIKUM constructed TERVIKUM constructed and equipped Q4 2025 106 6.3. Strengthening primary health M Entry into force of the Decree of the Entry into force of legislative amendments Q3 2020 care Government, which amends the list of health care services of the Estonian Health Insurance Fund on access to specialised medical care 107 6.3. Strengthening primary health M Entry into force of amendments to the Decree Entry into force of the legislative Q1 2021 care of the Government which amends the list of amendments to the Decree of the health care services of the Estonian Health Government Insurance Fund on costs and services of general practitioners 108 6.3. Strengthening primary health M Entry into force of amendments to the Health Provision in the law indicating the entry Q1 2023 care Services Organisation Act into force of the law 109 6.4. Renewal of the eHealth M Approval of the eHealth Governance Approval of the proposal on the eHealth Q2 2023 Governance Framework and its implementation roadmap Governance Framework and implementation roadmap by the Steering 72 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year Committee of the “Eesti tervise IKT juhtimise raamistik” 113 6.6. Providing labour market M Entry into force of the Decree of the Minister of Entry into force of the Decree of the Q1 2022 measures to reduce youth Health and Labour to strengthen the “My First Minister of Health and Labour unemployment Job” scheme 114 6.6. Providing labour market M Youth Guarantee Action Plan Adoption of the reinforced Youth Q2 2022 measures to reduce youth Guarantee Action Plan by the Government unemployment 115.1 6.6. Interim step Number of young people participating in the Number of participants 0 1800 Q4 2023 “My First Job” scheme 115 6.6. Providing labour market T Number of young people participating in the Number of participants 0 3178 Q4 2025 measures to reduce youth “My First Job” scheme unemployment 116.1 6.7 Interim step Report on the results of consultation with social Submission to the Commission of a report Q2 2022 partners on the consultation of social partners on the mechanism of prolongation and the margin to be used. 116.2 6.7 Interim step Draft amendments to the Unemployment Submission to the Commission of the draft Q4 2022 Services and Benefits Act and the amendments Unemployment Insurance Act 116 6.7. Extending the duration of M Entry into force of the amendments to the Entry into force of the legislative Q2 2023 unemployment insurance benefits Unemployment Services and Benefits Act and amendments the Unemployment Insurance Act 117 6.8. Long-term care M Entry into force of amendments to the Social Entry into force of legislative amendments Q2 2022 Welfare Act 118 6.8. Long-term care M Action Plan on an integrated care model Adoption of the Action Plan Q4 2022 118.1 6.8. Ex-post monitoring Progress report Submission to the Commission of a Q4 2025 progress report on the implementation of 73 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year the actions included in the Action Plan on an integrated care model. 119 6.8. Long-term care M Entry into force of the decree of the Minister of Entry into force of the decree of the Q4 2024 Social Protection Minister of Social Protection 120 6.8. Long-term care M Entry into force of the legislative amendments Entry into force of the legislative Q1 2025 of the support system for children with high amendments care needs 121 6.9. Reducing gender pay gap M Adoption of the Welfare Development Plan Adoption of the Welfare Development Plan Q1 2024 2023-2030 by the government 121.1 6.9 Ex-post monitoring Progress report Submission of a progress report on the Q1 2026 implementation of the actions on gender pay gap included in the Welfare development plan 2023-2030 122 6.9. Reducing gender pay gap M Digital gender pay gap tool Developing a prototype of a gender pay Q4 2022 gap tool 123.1 6.9. Interim step Progress report Submission to the Commission of a Q2 2023 progress report on the state of play of rolling out a gender pay gap tool. 123 6.9. Reducing gender pay gap M Digital gender pay gap tool Roll-out of a digital gender pay gap tool Q1 2024 123.2 6.9 Ex-post monitoring Progress report Submission to the Commission of a Q2 2026 progress report on employers’ experience of using of the gender pay gap tool and how it helped them to take effective action in order to implement the principle of equal pay and to reduce the gender pay gap 124 Monitoring and implementation of M Entry into force of the Government Regulation Entry into force of government regulation Q4 2021 the plan on the legal framework for the implementation and monitoring of the recovery and resilience plan of Estonia. 74 # Related measure M/T Name Qualitative indicators Quantitative indicators Date for completion (reform or investment) (for milestones) (for targets) Unit Baseline Goal Q Year 125 8.1 Facilitating the deployment of M Publication of the call for proposals to support Publication of the call for proposals Q3 2023 renewable energy sources local authorities 126 8.1 Facilitating the deployment of M Entry into force of the amendments to the Entry into force of the amendments Q2 2024 renewable energy sources relevant laws streamlining permitting, planning and environmental impact assessment processes 127 8.1 Facilitating the deployment of M Governmental decision establishing priority Governmental decision adopted Q3 2024 renewable energy sources development areas for wind energy 128 8.1 Facilitating the deployment of T Support to local authorities Number of local authorities 0 20 Q1 2025 renewable energy sources supported 129 8.2 Programme to increase the M Signature of the co-financing agreement for Signed agreement Q1 2024 access of renewable energy electricity distribution network works production to the electricity distribution network 130 8.2 Programme to increase the T Construction finished and additional 160 MW MW of additional capacity 0 160 Q1 2026 access of renewable energy capacity available available production to the electricity distribution network 131 8.3 Increasing production and M Call for applications for grants to support the Call for applications published Q2 2024 uptake of sustainable biogas and uptake of biomethane biomethane 132 8.3 Increasing production and M Independent survey identifying the necessary Publication of the final report on the survey Q4 2024 uptake of sustainable biogas and regulatory, organizational and financial biomethane interventions 133 8.3 Increasing production and M Development of an action plan for the Approved plan Q2 2025 uptake of sustainable biogas and production and deployment of biogas and biomethane biomethane 134 8.3 Increasing production and T Installation of new biomethane production Increase in installed production 0 4 000 000 Q2 2026 uptake of sustainable biogas and capacity capacity of sustainable biomethane biomethane in cubic metres 75 76
Allikas: Rahandusministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel