ESTONIA LATVIA LITHUANIA www.tgsbaltic.com
Saatja: Magnus Brogaard Larsen <
[email protected]>
Saadetud: 30.08.2022 19:43
Adressaat: MKM info <
[email protected]>
Koopia: Timo Tatar <
[email protected]>; Jaanus Uiga <
[email protected]>;
Regina Rass <
[email protected]>; Liis Kilk <
[email protected]>; Kristi
Talving <
[email protected]>; Liina Roosimägi
<
[email protected]>; Megan Alieh Mahdi <
[email protected]>
Teema: CIP Comments on draft Estonian Offshore Wind Legislation
Lugupeetavad
Esitan hoonestusloa taotleja CI NMF Estonia Sea I OÜ nimel arvamuse ja
küsimused majandus- ja taristuministri määruse „Konkureerivate
hoonestusloa taotluste hindamise tingimused ja kord, hoonestusloa
menetluse konkursi korras algatamise kord ja enampakkumise alghinna
määramise metoodika" eelnõu kohta.
Vajadusel oleme valmis oma ettepanekuid selgitama täiendavalt, sh
suuliselt.
Austusega
Magnus Brogaard Larsen
------------ English version ---------------------
Dear Madams/Sirs,
On behalf of the applicant for a building permit, CI NMF Estonia Sea I
OÜ, I hereby submit comments on the draft Regulation of the Minister of
Economic Affairs and Infrastructure on the conditions and procedure for
the assessment of competing applications for a building permit, the
procedure for initiating the building permit procedure by competitive
tendering and the methodology for determining the starting price of the
auction.
If necessary, we are ready to clarify our proposals further.
Best regards,
Magnus Brogaard Larsen
_________________________________________
Magnus Brogaard Larsen
Director
Copenhagen Infrastructure Partners
Amerika Plads 29
DK-2100 Copenhagen Ø
Denmark
E-mail:
Mobile: +45 2027 3609
Main: +45 7070 5151
Web:
This e-mail is from Copenhagen Infrastructure Partners I K/S (CVR-no.
34729069), Copenhagen Infrastructure Partners II P/S (CVR-no. 35682775)
and/or Copenhagen Infrastructure Partners P/S (CVR-no. 37994006) all
domiciled Amerika Plads 29, DK-2100 Copenhagen Ø, Denmark.
This e-mail and any attached files may contain confidential information.
If you are not the intended recipient, please notify us immediately and
return the e-mail without copying, distributing or disclosing any of its
contents.
The sender does not accept liability for any errors or omissions in the
contents of this e-mail which may arise as a result of the transmission.
CONFIDNETIAL
Application overview Estonia
July 2022
Only the right/intended addressees are allowed to access and read this document. This document may contain confidential
information and shall not be disclosed to any third party, referred to or published without CIP’s prior written approval.
CONFIDNETIAL
Overview of current applications within Estonia’s wind energy development and
innovation areas as of 08.07.2022
Number of areas to publish if current applications for areas are not merged – See next pages for suggestion of alternative project-sized approach
29 31
30 32
33 34
35
6 7 36
5 8
4 13
3 37 38 39
11 12 14 16
40 41 44 Example of area
2 10
that developers will
9 15 have to reapply for
42 43
1
17 19
18
22
23 24
20
26 27
• Currently 21 applications in the Ministry of Environment’s GIS-viewer
25 (xgis.maaamet.ee), where 17 applications have overlaps and 4 have
21 none
‒ Not including CIP’s and other future applications
• 17 applications with overlaps result in 40 areas where resubmittal is
required due to overlaps
28 • In total 44 areas across offshore wind zone with 7GW capacity equals
an average project size of 159 MW
Outcome
Outside • Time and resource intensive process for CPTRA if not altered
of MSP
• Uncertainty of achieving an area of feasible size will likely decrease
developer interest and result in lack of competition for areas and sub-
optimal allocation of Estonian offshore wind zones
2
CONFIDNETIAL
Overview of areas in Estonia with +1GW capacity
A total of 8 areas with sizes accommodating +1 GW
29 31
30 32
33 34 8
35
6 7 36
5 8 7
4 13
3 37 38 39
11 12 14 16
4 40 41 44 Example of area
2 10
1 that developers will
9 15 have to reapply for
2 3 43
42
1
17 19
18 5
22
23 24
20 6
26 27
• Areas clustered based on existing applications avoiding to splitting them
25 up but requiring applicants to cluster their applications to some degree
21
Outcome
• Achieving project-sized areas allow developers to apply for areas which
can stand alone, which is expected to:
28 ‒ Increase applicants per area i.e. competition
‒ Ensure smooth and fast development of Estonian offshore wind
Pros: Scale advantages and lower LCoEs + Allocation of all areas
Cons: +1 GW-sized areas could potentially disable local developers to
obtain areas alone. Local and international developers could combine
local expertise with offshore wind experience and financial capability