dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Majandus- ja Kommunikatsiooniministeerium
Sissetulev kiriAvalik

Kiri

Majandus- ja Kommunikatsiooniministeerium · 13. juuli 2022
Viit
24.1-6/2022/4628-1
Registreeritud
13. juuli 2022
Dokumendi liik
Sissetulev kiri
Adressaat
Energy Charter Secretariat
Saabumis/saatmisviis
tavapost
Funktsioon
24.1 EL ja rahvusvahelise koostöö korraldamine
Sari
24.1-6/S Rahvusvahelise koostöö korraldamisega seotud kirjavahetus (Arhiiviväärtuslik)
Toimik
24.1-6/2022
Vastutaja
Anastassia Batulin (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Energeetika ja maavarade valdkond, Energeetikaosakond)
Lahendamise tähtaeg
12. august 2022

Failid

  • 📎24.1-6 2022 4628-1 13072022 Kiri.pdf373 KB

Sisu (failidest)

3 INTERNATIONAL ENERGY CHARTER SECRETARY GENERAL Brussels, 28 June 2022 SG/22/E/0255 H.E. Mr. Taavi Aas Minister of Economic Affairs and Infrastructure Republic of Estonia Sub/ect: Public communication explaining the main chanes contained in the agreement in principle Dear Minister, As you know, the Ad-Hoc Meeting of the Energy Charter Conference took place in Brussels on 24 June 2022. On this occasion, the Energy Charter Conference approved an historical and unprecedented agreernent which is not only Paris Agreement compatible, but which will allow, based on the principles of UNFCCC, differentiated but common responsibility to accelerate the energy transition and reinforce the affordable energy resources for all. You will find attached the Public communication explaining the main changes contained in the agreement in principle on the modernisation of the ECT. Please accept, dear Minister, the assurances of my highest consideration. Yours sincerely, IMUNW(ATSPOONM1MStEER1UM 13. 074 2022 1 ‘ ENERGY CHARTER SECRETARIAT Boulevard de la Woluwe, 46 8-1200 Brussels, Beigium Mali: [email protected] Web: www.energycharter.or Phone: +32 2 775 98 10 • COMMON RULES FOR GLOBAL ENERGY SECURIfl’ Fax: +322 775 98 13 ENERGY CHARTER SECRETARIAT CCDEC 2022 lOGEN Brussels, 24 June 2022 Related documents: Room Document 1 DECISION OF THE ENERGY CHARTER CONFERENCE Subject: Public Communication expialning the main changes contained in the agreement in principle The Energy Charter Conference at its Ad be Mecting held on 24 June 2022 approved the attached Public Communication explaining the main changes contained in the agreement in principle on the modemisation of the ECT. Keywords: Modernisation, Agreement in Principle Finalisation ofthe negotiations on the Modernisation ofthe Energy Charter Treaty Brussels 24 June 2022 The Contracting Parties of the Energy Charter Treaty (ECT) have today reached an agreement in principle, thus concluding the negotiations for a modernised ECT. After the completion of an editorial and legal review, the draft text will be communicated to the Contracting Parties by 22 August 2022 for adoption by the Energy Charter Conference on 22November2022. Thereafter, the modemisedECTwillenterinto force 90 days after the ratification by three-fourths of the Contracting Parties. The agreement in princip le is without prejudice regarding its final assessment by the Contracting Parties. How the Agreement in Principle was reached In November 2017, the Energy Charter Conference confirmed in Ashgabat, Turkmenistan, the launching ofa discussion on the potential modernisation of the ECT. After consultations in early 2018, Contracting Parties agreed to address a specific list of topics (CCDEC2O 18 1 8). In Autumn 2019, the Conference approved (CCDEC2O19 08) some suggested policy options for each of the agreed topics and the mandate for the Modemisation Group to conciude negotiations expeditiously (CCDEC2O 19 10). After the formal start of the negotiationsin July 2020, the Modernisation Group held 15 rounds of negotiations, 12 of which were held via videoconference, 2 in hybnd mode and one in person due to pandemic-related travel restrictions (for public summaries of each round see Summary of the main achievements of the negotiations Pending the completion of an editorial and legal review of the text, the following summary presents, in a non-exbaustive manner, the main outcome of the negotiations but does not by any means constitute a legal text. Once the final text for the modernisation of the ECT is confirmed by the conference on 22 November 2022 (see above), it will be immediately published. 1. Definitions Regarding the meaning of “Charter” (Articie 1(1) ECT), it was decided to include a reference to the 2015 International Energy Charter. Under the topic “Definition of Economic Activity in the Energy Sector”, negotiations focused on the scope of the modernised ECT in terms of business activities and so urces of energy covered. The definition is now extended to cover the capture, uti lisatio n and storage of carbon dioxide (CCUS) in order to decarbonise the energy systems. The revised provisions now envisage how investments in different sources of energy will be protected under the ECT against the backdrop of dean energy goals of Contracting Parties. The result of these intense discussions builds on three pillars: Pilar 1: Updated list of Energy Materials and Products Some Energy Materials and Products are introduced and covered by the investment protection provisions, such as: • Hydrogen; • Anhydrous Ammonia; • Biomass; • Biogas; and • Synthetic fuels. Additional Energy-Related Equipment is introduced and covered by the trade provisions, such as wool, rock-wool and similar mineral wools;and Multiple walled insulating units of glass. Pilar 2: Flexibility A novel “flexibility mechanism” allows Contracting Parties, based on a Conference decision, to exclude investment protection for fossil fuels in their territories, considering their individual energy security and climate goals. For example, the EU and the UK have opted to carve-out fossil fuel related investments from investment protection under the ECT, inciuding for existing investments after 10 years from the entry into force of the relevant provisions and for new investments made after 15 August 2023 as of that date with limited exceptions. The envisaged exclusions will not, as a matter of principle, affect investment protection in the territory of other Contracting Parties, unless they opt to apply them vis-å-vis investors from the aforementioned Contracting Parties reciprocally. Pilar 3: Review mechanism Five years after the entry into force of the modernised ECT and thereafter at intervals of five years, or on an earlier date as determined by the Charter Conference, the list of Energy Materials and Products covered under the ECT as well as the application of the Flexibility Mechanism will be reviewed. This will give Contracting Parties the possibility to react to technological as well as political developments. 2. Investment Protection Definition of Investment: In order to be coveid by the Treaty, an investment must, inter alia, explicitly be made oracquired in accordance with the applicable laws’ of the host Contracting Party, and fulfil an indicative list of characteristics, such as the commitment of capital, the expectation of gain orprofit, a certain duration orthe assumption of risk. The new definition excludes the coverage of judicial and administrative decisions and arbitral awards as weil as limits the coverage of claims to money and credit arising solely from commercial transactions for the sale of goods and services. Spccific public debt instruments are excluded from the coverage of the dispute settlement provisions. Definition of Investor: The new provision excludes the coverage of individuals who hold the nationality, or are permanent residents, of the host Contracting Party at the time of making an Investment. It is now moreover necessary to meet the requirement of substantial business activities by demonstrating the circumstances from the indicative list inciuded in the Treaty (such as physical presence, employment of staff, tumover generation or payment of taxes in the Area of a host Contracting Party). Clarification of ‘most constant protection and security’: It is clarified that this provision concerns the physical security of Investors and Investments. Transfers related to investments: An exception for serious balance-of-payments difficulties is introduced, together with a specific provision for the safeguard measures in case of serious difficulties in the operation of the economic and monetary union of the European Union or in monetary and exchange rate policies of other Contracting Parties. Definition of Fair and Eguitable Treatment: To increase legal certainty, the new article providing for fair and equitable treatment’ under the ECT will provide for a list that designates certain measures or series of measures that constitute a violation of this protection standard. Among such measures or series of measures, the new provision specifies the frustration of Investor’s legitimate expectations and it describes circumstances that give rise to Investor’s legitimate expectations and the conditions under which legitimate expectations may be considered. Definition of Indirect Expropriation: The new provision clarifies the notion of ‘Direct Expropriation’ and further introduces a definition of ‘Indirect Expropriation’ together with a list of factors that are required to be considered for the determination of the existence of an indirect expropriation in each case (such as economic impact and character of the measure). As a general rule, non-discriminatory measures that are adopted to protect legitimate policy objectives, such as public health, safety and the environment (inciuding with respect to climate change mitigation and adaptation), do not constitute indirect expropriation. ‘The modemised ECT clarifies that the dom estic law of a Contracting Party shall not be part of the applicable law and may only be consideredas a maner of fact. Dcnial of benefits: To ensure effectiveness of the provision, the Treaty envisages the timeline for invoking the denial-of-benefits clause, inciuding possibility to invoke it after the commencement of an arbitral procceding. The denial-of-benefits c lau se will not be subject to an advance formal notification. The new provision clarifies the situations when the protection to an Investment may be denied, notably for maintenance of international peace and security, inciuding the protection of human rights. MFN clause: For greater legal certainty, it is clarified that the most-favoured-nation treatment clause shall not extend to dispute settlement procedures in other international agreements and the substantivc provisions in other international agreements in and of themselves do not constitute “treatment” to be accorded under this clause. Right to regulate: Additional wording in the preambie and throughout the Treaty are introduced to reiterate and strengthen the right of Contracting Parties to regulate within their territories. For legal certainty, a new stand-alone articie on the right to regulate is introduced in Part III of the Treaty to reaffirm the Contracting Parties’ right to regulate vis-a-vis Investments and Investors in the interest of legitimate public policy obj ec t iv es. Such objectives may inciude the protection of the environment, inciuding climate change mitigation and adaptation, protection of public health, safety or public morals. A new structure is introduced in provisions on the exceptions from the Treaty to complement the existing general exceptions building on the provisions of GATT and GATS and clarify a possibility of taking measures for the maintenance of international peace and security. Umbrella clause: Only a breach of specific written commitments through the exercise of govemmental authority will be covered. 3. Dispute Settlement Transparency. The UNCITRAL Rules on Transparency in Treaty-based Investor-State arbitration of 1 April 2014 will apply to arbitral proceedings in disputes between Investors and Contracting Parties with furthcr additions envisaged in the Treaty. A greater transparency is introduced in dispute settlement procedures for disputes b etw een the Contracting Parties ensuring that procedural documents in such disputes are pub licly available and that the hearings may be publicly accessible. Frivolous claims. To ensure efficiency of arbitral proceedings and reduce the costs of litigation, mechanisms are established for (i) dismissal of claims that are manifestly without legal merits as a matter of substance orjurisdiction at the outset of proceedings and (ii) expedited dismissal of claims unfounded as a matter of law on merits. A sp ecial provision is envisaged for dismissal of claims submitted as a result of investment restructuring for the sole purpose of submitting a claim under the Treaty. Security for costs. A new provision is introduced giving a Contracting Party the possibility to request a claimant to post secunty for costs in certain cases, such as risks of not honouring an adverse decision on costs. Third-party fundmg. The new provision will require both disputing parties to disclose information on a third party fmancing its litigation costs. Valuation of damages. The new provision clarifies that an arbitral award may provide for monetary damages or restitution in case of expropriation. Monetary damages are limited to the loss suffered by an Investor and may not inciude punitive damages. As a general rule, the costs of the proceedings and other reasonable costs shall be bome by the unsuccessful party to the disputc. 4. Transit Some general principles are introduced with respect to: • facilitation of transparent and non-discriminatory access to existing and future Energy Transport Facilities; • circumstances when the access couldbe denied, in which case the reasons should be duly substantiated; • capacity allocation mechanisms and congestion management procedures for Energy Transport Facilities; • the objective, transparent and non-discriminatory application of tariffs required for access to or the use of Energy Transport Facilities for transit purposes, as well as the methodologies used for their calculation. For transit of natural gas and oj!, the definitions of “Access to Energy Transport Facilities” and “Available Capacity” were introduced. Furthermore, the transit provisions were updated with reference to virtual flows and international swap operations, which could be used by Contracting Parties to organise thcir energy systems. 5. Sustainable development and corporate social responsibiity Contracting Parties recognised the urgent nced to effectively combat climate change. A number of provisions were introduced that reaffirm the respective rights and obligations of the Contracting Parties under multilateral environmental and labour agrcements, such as the UNFCCC, the Paris Agreement and ILO fundamental conventions, as relevant for the cnergy sector. They also reiterated their commitment to promoting international trade and investment in the energy sector in a manner that would contribute to the objectives of sustainable development and responsible business practices. Moreover, the Contracting Parties shall not encourage international trade and investment in energy by lowering their respective environmental and labour protection laws and standards. The Contracting Parties will promotc adheince to international standards and principles of responsible business conduct among the Investors operating within their Areas. The new provisions on sustainable development and corporate social responsibility further clarify and strengthen the provisions on environmental impact assessment of energy investment projects in accordance with respective laws and regulations of Contracting Parties ensuring higher level of environmental protection and wider public participation. The Contracting Parties reaffirmed their commitment to dean energy transition, promotion of low-carbon technologies in energy trade and investment, and cooperation in implementing climate change-related policies, where appropriate. A dedicated dispute settlement mechanism will be applicable to disputes between the Contracting Parties regarding the interpretation and application of the new provisions on sustainable development. Such dispute settlement mechanism will inciude a possibility to refer the matter to a conciliator. 6. Regional Economic Integration Organisation (REIO) An article has been introduced that clarifies that Articles 7 (Transit), 26 (Investment dispute settlement), 27 (disputes between Contracting Parties), 29 (trade with non -WTO members) shall not apply among Contracting Parties that are members of the same Regional Economic Integration Organisation in their mutual relations. Currently, the European Union is the only REIO Contracting Party. 7. Obsolete provisions The ECT will also be modernised by the removal ofprovisions and Annexes that either are no longer applicable duc to their transitional nature and updating some references (e.g. in relation to the European Communities). 8. Pre-investment It was decided to remove the obligationto negotiate the supplementary treaty to provide protection to pre-investment (current Article 10.4), while keeping the existing vo luntary (Article 10.6) and best endeavour (Articles 10.2 and 10.5) provisions regarding pre investment as well as the obligation to notify the Secretariat of any discriminatory measure applied to pre-investment (Articie 10.9).
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel