dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Maanteeamet
Väljaminev kiriAvalik

Letter

Maanteeamet · 26. mai 2020
Viit
14-1/20-0558/25084-1
Registreeritud
26. mai 2020
Dokumendi liik
Väljaminev kiri
Adressaat
Interreg Central Baltic, Interreg Central Baltic
Saabumis/saatmisviis
vastutaja Outlook' ist saatmine
Funktsioon
14 Euroopa Liidu struktuurivahenditest ja muudest välisabi fondidest finantseeritud projektide haldamine
Sari
14-1 EL struktuurifondide ja muudest välisabi fondidest finantseeritud projektide korraldamise dokumendid (va tee-ehituse ja remondi toimikud)
Toimik
14-1/20-0558
Vastutaja
Kristjan Duubas (MA, Strateegilise planeerimise teenistus, Taristu arendamise osakond, Projekteerimisnõuete ja liikluskorralduse arendustalitus)

Failid

  • 📎Letter to Central Baltic Program CB891.docx35 KB

Sisu (failidest)

-864235 -144145 0 0 delta_recipientPersonName_1 \* MERGEFORMAT Merike Niitenpõld delta_recipientName_1 \* MERGEFORMAT Interreg Central Baltic Ratapihankatu 36, Turku Finland Your Ref: delta_senderRegDate \* MERGEFORMAT 26.05.2020 Our Ref: delta_regDateTime \* MERGEFORMAT 26.05.2020 No delta_regNumber \* MERGEFORMAT 14-1/20-0558/25084-1 delta_docName \* MERGEFORMAT Letter to Central Baltic Program CB891 Thank You for your letter dated 27.02.2020. Hereby Maanteeamet as lead partner replies with answers to CB questions with explanations describing corrections and the minor changes in project application. To approve on a waiting list the project SMART E263/E77 in Priority 3, SO 3.1 with a maximum ERDF co-financing of 2 207 656,33 EUR with the following conditions and technical corrections: 1. Present the planned time saving on the corridor in minutes. Corrected: Time savings in minutes added in application form fields “Project summary” and in “Project main results” 2. Closure period must be applied correctly Corrected: Project closure period is corrected, all activities are marked to end August 2022 3. Clarify staff costs calculation methods and salary levels in partner organisations. Corrected: Both organizations have corrected their salary inputs. Lead partner shall have two project members to whom staff cost will be declared: Lead partner Project Manager (fix rate, 50% of workload) and Technical Project Manager (fix rate, 50% of workload). Project partner, Latvian State Roads shall have one Project Coordinator (fix rate, 100% of workload) with declared staff cost. Both organizations have their inhouse project teams covering all responsibilities for smooth project implementation. 4. Preparation cost must be added to the project budget, and description of activities added in the Preparation WP. Corrected: Both partners have included the preparation cost sums and description of preparation activities. 5. Only one staff member costs are planned for both partners. Confirm that all other functions and responsibilities will be covered by the partner organisations. Corrected: Lead partner has corrected staff member list - lead partner shall have two project members to whom staff cost will be declared: Lead partner Project Manager (fix rate, 50% of workload) and Technical Project Manager (fix rate, 50% of workload). Project partner, Latvian State Roads shall have one Project Coordinator (fix rate, 100% of workload) with declared staff cost. Hereby we confirm that all project activities are supported by our inhouse experts for smooth and professional project deployment. In the addition we list below the descriptions of the minor changes made in application in waiting phase to adjust the budget for the most coherent input. Total budget sums for Lead partner and for Partner remain exactly same. The contribution sums remain also exactly same and they are in the limit of delivered contribution letters. EE changes 1. Staff cost was reduced due another set of project members take part and late start, sums shifted to A.T1.3; 2. Preliminary design cost A.T1.3 is increased 30 000€ due latest similar procurements inputs; 3. Cost of preliminary works A.I1.2 is reduced and shifted to A.T1.3 4. Informative billboard cost is increased LV changes 1. Staff cost is specified due late start of the project and closing period. 2. Cost of preliminary work is increased With best regards, Kristjan Duubas ITS Development Manager +372 delta_ownerPhone \* MERGEFORMAT 5034639
Allikas: Maanteeamet dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel