Saatja: Satori Michal Ing. <
[email protected]>
Saatmisaeg: 17. veebruar 2015. a. 16:05
Adressaat: Elsa Lepp
Koopia: Sergei Andrejev (
[email protected]); Sergei Aleksejev (
[email protected]); Janovsk?
Martin Ing.; Miku� Zolt?n Ing.; Vel?�ek Ji?? Ing.; Voz?b Ji??
Teema: RE: Noutekohasuse Tunnistus for J�rve veoalajaam + missing KTA and EP
Manused: protokoll_19214.ddoc; tmp0EA6948F-9912-470B-834B-39CBB36EF547.pdf;
tmp43A1468B-2713-4852-AE34-7DBB37835156.pdf
Dear Ms. Lepp,
I�m sending you in the appendix corrected technical control protocole for J�rve traction substation.
Best regards
Michal Satori
Elektrizace �eleznic Praha, a.s. - Eesti filiaal
Laki 26
12 915 Tallinn
tel.: +372 591 90 028
e-mail:
[email protected]
From: Elsa Lepp [mailto:
[email protected]]
Sent: Tuesday, February 10, 2015 2:44 PM
To: Sergei Andrejev (
[email protected])
Cc: Sergei Aleksejev (
[email protected]); Satori Michal Ing.
Subject: Noutekohasuse Tunnistus for J�rve veoalajaam + missing KTA and EP
Austatud Sergei Andrejev
Tehnilise J�relevalve Ametile on esitatud J�rve veoalajaama elektripaigaldise n�uetekohasuse tunnistus
ja aruanne nr MHV-15-00171. Aruandes olete Teie m�rgitud k�idukorraldajaks.
Vastavalt seadusele annab A-klassi p�devustunnistus �iguse juhtida elektri- ja k�idut�id mis tahes
tehniliste n�itajatega elektripaigaldises (k.a veoalajaamad). Keila veoalajaama puhul on
k�idukorraldajaks Sergei Aleksejev, kellel on olemas ka vastav A-klassi p�devustunnistus.
Siinkohal sooviksime t�psustada, kes on m��ratud vastava p�devusega k�idukorraldajaks J�rve
veoalajaamas?
Lugupidamisega
Elsa Lepp
Raudteeinfrastruktuuri osakonna peaspetsialist
[email protected] | www.tja.ee
Tehnilise J�relevalve Amet
S�le 23A, 10614 Tallinn
From: Satori Michal Ing. [mailto:
[email protected]]
Sent: Monday, February 09, 2015 2:27 PM
To: Elsa Lepp
Cc:
[email protected]; Sergei Andrejev (
[email protected]) (
[email protected]);
Janovsk? Martin Ing.; Miku� Zolt?n Ing.
Subject: Noutekohasuse Tunnistus for J�rve veoalajaam + missing KTA and EP
Dear Ms. Lepp,
we have finished succesfull interconnection of Jarve traction substation and new traction substation was
set into operation on 30.1.2015. All measurements in range of technical control were succesfull and we
obtained Noutekohasuse Tunnistus (pls see appendix) from MHV company on 3.2.2015. We have handed
over missing KTA and EP for time period 8.11.2014 � 30.1.2015 to AS Eesti Raudtee for signing and
obtained them back on Friday. I will send you them per link now.
Could you please check all these documents and give me feedback if all TJA conditions in permit of use
were fulfilled and we could handed over new traction substation to AS Eesti Raudtee?
Thank you
Best regards
Michal Satori
Elektrizace �eleznic Praha, a.s. - Eesti filiaal
Laki 26
12 915 Tallinn
tel.: +372 591 90 028
e-mail:
[email protected]
From: Andres Arman [mailto:
[email protected]]
Sent: Tuesday, February 03, 2015 10:17 AM
To: Vel?�ek Ji?? Ing.
Cc: Vel?�ek Ji?? Ing.
Subject: protokoll_17773.ddoc
Tere,
MHV Elektrikontroll O�
Andres Arman
ekspert
Mob. 50 63 530
[email protected]
www.elektrikontroll.eu