Sotsiaalministeerium · 10. august 2021
Sisu (failidest)
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
EUROPEAN COMMISSION
European Health and Digital Executive Agency
The Director
GRANT AGREEMENT
NUMBER 101035467 — TEHDAS
This Agreement (‘the Agreement’) is between the following parties:
on the one part,
the European Health and Digital Executive Agency (HaDEA) ('the Agency'), under the powers
delegated by the European Commission ('the Commission'), represented for the purposes of
signature of this Agreement by Nicolas KRIEGER, Acting Head of Unit, or his/her duly authorised
representative,
and
on the other part,
1. ‘the coordinator’:
SUOMEN ITSENAISYYDEN JUHLARAHASTO (Sitra), established in ITAMERENKATU
11-13, HELSINKI 00180, Finland, VAT number: FI02021323, represented for the purposes of signing
the Agreement by Heidi Saario
and the following other beneficiaries, if they sign their ‘Accession Form’ (see Annex 3 and Article 40):
2. BUNDESMINISTERIUM FUER SOZIALES, GESUNDHEIT, PFLEGE UND
KONSUMENTENSCHUTZ (ATNA), established in Radetzkystrasse 2, WIEN 1030, Austria,
3. SCIENSANO (Sciensano), established in JULIETTE WYTSMANSTRAAT 14, ELSENE 1050,
Belgium, VAT number: BE0693876830,
4. HRVATSKI ZAVOD ZA ZDRAVSTVENO OSIGURANJE (CHIF), established in
MARGARETSKA 3, ZAGREB 10000, Croatia, VAT number: HR3580261,
5. Ministry of Health of the Republic of Cyprus (MoH-CY), established in 1 Prodromou Street &
17 Chilonos Street 1 & 17, Nicosia 1448, Cyprus,
6. MINISTERSTVO ZDRAVOTNICTVI CESKE REPUBLIKY (MZCR), established in
PALACKEHO NAMESTI 375/4, PRAHA 12801, Czech Republic,
7. REGION MIDTJYLLAND (RM), established in Skottenborg 26, VIBORG 8800, Denmark, VAT
number: DK29190925,
1
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
8. SOTSIAALMINISTEERIUM (MoSA), established in Suur-Ameerika 1, TALLINN 10122,
Estonia,
9. PLATEFORME DES DONNEES DE SANTE (FR-HDH), established in 9 RUE GEORGES
PITARD, Paris 75015, France, VAT number: FR66130003783,
10. BUNDESMINISTERIUM FUER GESUNDHEIT (BMG), established in ROCHUSTRASSE
1, BONN 53123, Germany,
11. DIOIKISI 6IS YGEIONOMIKIS PERIFEREIAS PELOPONNISOU IONION NYSON
IPEIROU KAI DYTIKIS ELLADAS (6th Y. PE.), established in IPATIS 1, PATRAS 26 441,
Greece, VAT number: EL999100797,
12. ORSZAGOS KORHAZI FOIGAZGATOSAG (OKFŐ), established in DIOS AROK 3,
BUDAPEST 1125, Hungary, VAT number: HU15845883,
13. DEPARTMENT OF HEALTH (DoH-IE), established in Block 1, Miesian Plaza, 50 – 58 Lower
Baggot Street, Dublin D02 XW14, Ireland,
14. MINISTERO DELLA SALUTE (MINSAL), established in Via Giorgio Ribotta 5, ROMA
00144, Italy, VAT number: N/A,
15. LIETUVOS RESPUBLIKOS SVEIKATOS APSAUGOS MINISTERIJA (SAM-LT),
established in VILNIAUS G 33, VILNIUS LT 01506, Lithuania,
16. Ministry for Health - Government of Malta (DHIR), established in Palazzo Castellania,
Merchants Street 15, Valletta VLT 200, Malta, VAT number: MT12979127,
17. AGENTIA DE TRANSPLANT (ATRM), established in STRADA TESTEMITEANU 29,
CHISINAU 2025, Moldova,
18. MINISTERIE VAN VOLKSGEZONDHEID, WELZIJN EN SPORT (VWS), established in
PARNASSUSPLEIN 5, DEN HAAG 2500 EJ, Netherlands,
19. THE NORWEGIAN MINISTRY OF HEALTH AND CARE SERVICES (MoH-NO),
established in R6 Teatergata 9, 0030 Oslo 8011, Norway,
20. SPMS - SERVICOS PARTILHADOS DO MINISTERIO DA SAUDE EPE (SPMS),
established in AVENIDA DA REPUBLICA, 61, LISBOA 1050 189, Portugal, VAT number:
PT509540716,
21. INSTITUT ZA ZASTITU ZDRAVLJA SRBIJEDR MILAN JOVANOVIC BATUT (IPHS
"Batut"), established in DR SUBOTICA STREET 5, BEOGRAD 11000, Serbia, VAT number:
RS102000930,
22. NACIONALNI INSTITUT ZA JAVNO ZDRAVJE (NIJZ), established in TRUBARJEVA
CESTA 2, LJUBLJANA 1000, Slovenia, VAT number: SI44724535,
23. INSTITUTO ARAGONES DE CIENCIAS DE LA SALUD (IACS), established in AVENIDA
SAN JUAN BOSCO 13, ZARAGOZA 50009, Spain, VAT number: ESQ5000654C,
24. E-HALSOMYNDIGHETEN (SEHA), established in SANK ERIKSGATAN 117,
STOCKHOLM 118 60, Sweden, VAT number: SE202100655201,
2
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
25. THE NHS CONFEDERATION (NHSC), established in 2ND FLOOR 18 SMITH SQUARE,
LONDON SW1P 3HZ, United Kingdom, VAT number: GB788186860,
Unless otherwise specified, references to ‘beneficiary’ or ‘beneficiaries’ include the coordinator.
The parties referred to above have agreed to enter into the Agreement under the terms and conditions
below.
By signing the Agreement or the Accession Form, the beneficiaries accept the grant and agree to
implement it under their own responsibility and in accordance with the Agreement, with all the
obligations and conditions it sets out.
The Agreement is composed of:
Terms and Conditions
Annex 1 Description of the action
Annex 2 Estimated budget for the action
Annex 2a Not applicable
Annex 3 Accession Forms
Annex 4 Model for the financial statements
Annex 5 Model for the certificate on the financial statements (CFS)
3
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
TERMS AND CONDITIONS
TABLE OF CONTENTS
CHAPTER 1 GENERAL................................................................................................................................................9
ARTICLE 1 — SUBJECT OF THE AGREEMENT.........................................................................................9
CHAPTER 2 ACTION................................................................................................................................................... 9
ARTICLE 2 — ACTION TO BE IMPLEMENTED.........................................................................................9
ARTICLE 3 — DURATION AND STARTING DATE OF THE ACTION......................................................9
ARTICLE 4 — ESTIMATED BUDGET AND BUDGET TRANSFERS........................................................ 9
4.1 Estimated budget.................................................................................................................................. 9
4.2 Budget transfers....................................................................................................................................9
CHAPTER 3 GRANT.....................................................................................................................................................9
ARTICLE 5 — GRANT AMOUNT, FORM OF GRANT, REIMBURSEMENT RATE AND FORMS OF
COSTS..............................................................................................................................................9
5.1 Maximum grant amount....................................................................................................................... 9
5.2 Form of grant, reimbursement rate and forms of costs....................................................................... 9
5.3 Final grant amount — Calculation.....................................................................................................10
5.4 Revised final grant amount — Calculation....................................................................................... 11
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS................................................................................12
6.1 General conditions for costs to be eligible........................................................................................ 12
6.2 Specific conditions for costs to be eligible........................................................................................12
6.3 Conditions for costs of affiliated entities to be eligible.....................................................................15
6.4 Ineligible costs....................................................................................................................................15
6.5 Consequences of declaration of ineligible costs................................................................................ 16
CHAPTER 4 RIGHTS AND OBLIGATIONS OF THE PARTIES........................................................................ 16
SECTION 1 RIGHTS AND OBLIGATIONS RELATED TO IMPLEMENTING THE ACTION................ 16
ARTICLE 7 — GENERAL OBLIGATION TO PROPERLY IMPLEMENT THE ACTION.........................16
7.1 General obligation to properly implement the action........................................................................ 16
7.2 Consequences of non-compliance...................................................................................................... 16
ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD PARTIES INVOLVED IN THE
ACTION.........................................................................................................................................17
ARTICLE 8a — IMPLEMENTATION OF ACTION TASKS BY BENEFICIARIES NOT RECEIVING EU
FUNDING...................................................................................................................................... 17
ARTICLE 9 — PURCHASE OF GOODS, WORKS OR SERVICES............................................................17
9.1 Rules for purchasing goods, works or services................................................................................. 17
4
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
9.2 Consequences of non-compliance...................................................................................................... 17
ARTICLE 10 — IMPLEMENTATION OF ACTION TASKS BY SUBCONTRACTORS............................18
10.1 Rules for subcontracting action tasks.............................................................................................. 18
10.2 Consequences of non-compliance.................................................................................................... 18
ARTICLE 11 — IMPLEMENTATION OF ACTION TASKS BY AFFILIATED ENTITIES........................18
11.1 Rules for calling upon affiliated entities to implement part of the action........................................19
11.2 Consequences of non-compliance.................................................................................................... 20
ARTICLE 11a — FINANCIAL SUPPORT TO THIRD PARTIES.................................................................20
SECTION 2 RIGHTS AND OBLIGATIONS RELATED TO THE GRANT ADMINISTRATION.............. 20
ARTICLE 12 — GENERAL OBLIGATION TO INFORM............................................................................20
12.1 General obligation to provide information upon request.................................................................20
12.2 Obligation to keep information up to date and to inform about events and circumstances likely to
affect the Agreement........................................................................................................................20
12.3 Consequences of non-compliance.................................................................................................... 21
ARTICLE 13 — KEEPING RECORDS — SUPPORTING DOCUMENTATION.........................................21
13.1 Obligation to keep records and other supporting documentation.................................................... 21
13.2 Consequences of non-compliance.................................................................................................... 22
ARTICLE 14 — SUBMISSION OF DELIVERABLES................................................................................. 22
14.1 Obligation to submit deliverables.................................................................................................... 22
14.2 Consequences of non-compliance.................................................................................................... 22
ARTICLE 15 — REPORTING — PAYMENT REQUESTS.......................................................................... 22
15.1 Obligation to submit reports............................................................................................................ 22
15.2 Reporting periods............................................................................................................................. 23
15.2a Request(s) for further pre-financing payment(s)............................................................................23
15.3 Periodic reports — Requests for interim payments.........................................................................23
15.4 Final report — Request for payment of the balance....................................................................... 24
15.5 Information on cumulative expenditure incurred.............................................................................25
15.6 Currency for financial statements and conversion into euro........................................................... 25
15.7 Language of reports..........................................................................................................................25
15.8 Consequences of non-compliance.................................................................................................... 25
ARTICLE 16 — PAYMENTS AND PAYMENT ARRANGEMENTS...........................................................25
16.1 Payments to be made....................................................................................................................... 25
16.2 Pre-financing payment — Amount .................................................................................................25
16.3 Interim payments — Amount — Calculation..................................................................................26
16.4 Payment of the balance — Amount — Calculation........................................................................ 26
5
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
16.5 Notification of amounts due.............................................................................................................27
16.6 Currency for payments..................................................................................................................... 27
16.7 Payments to the coordinator — Distribution to the beneficiaries....................................................27
16.8 Bank account for payments..............................................................................................................28
16.9 Costs of payment transfers...............................................................................................................28
16.10 Date of payment............................................................................................................................. 28
16.11 Consequences of non-compliance.................................................................................................. 28
ARTICLE 17 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF
FINDINGS..................................................................................................................................... 29
17.1 Checks, reviews and audits by the Agency and the Commission....................................................29
17.2 Investigations by the European Anti-Fraud Office (OLAF)............................................................30
17.3 Checks and audits by the European Court of Auditors (ECA)........................................................31
17.4 Checks, reviews, audits and investigations for international organisations..................................... 31
17.5 Consequences of findings in checks, reviews, audits and investigations — Extension of
findings............................................................................................................................................. 31
17.6 Consequences of non-compliance.................................................................................................... 33
ARTICLE 18 — EVALUATION OF THE IMPACT OF THE ACTION....................................................... 33
18.1 Right to evaluate the impact of the action.......................................................................................33
18.2 Consequences of non-compliance.................................................................................................... 33
SECTION 3 OTHER RIGHTS AND OBLIGATIONS.......................................................................................33
ARTICLE 19 — PRE-EXISTING RIGHTS AND OWNERSHIP OF THE RESULTS (INCLUDING
INTELLECTUAL AND INDUSTRIAL PROPERTY RIGHTS)................................................. 33
19.1 Pre-existing rights and access rights to pre-existing rights............................................................. 33
19.2 Ownership of results and rights of use............................................................................................ 34
19.3 Consequences of non-compliance.................................................................................................... 34
ARTICLE 20 — CONFLICT OF INTERESTS.............................................................................................. 34
20.1 Obligation to avoid a conflict of interests....................................................................................... 34
20.2 Consequences of non-compliance.................................................................................................... 34
ARTICLE 21 — CONFIDENTIALITY...........................................................................................................34
21.1 General obligation to maintain confidentiality................................................................................ 34
21.2 Consequences of non-compliance.................................................................................................... 35
ARTICLE 22 — PROMOTING THE ACTION — VISIBILITY OF EU FUNDING....................................35
22.1 Communication activities by the beneficiaries................................................................................ 35
22.2 Communication activities by the Agency and the Commission...................................................... 35
22.3 Consequences of non-compliance.................................................................................................... 36
ARTICLE 23 — PROCESSING OF PERSONAL DATA...............................................................................37
6
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
23.1 Processing of personal data by the Agency and the Commission................................................... 37
23.2 Processing of personal data by the beneficiaries............................................................................. 37
23.3 Consequences of non-compliance.................................................................................................... 37
ARTICLE 24 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE AGENCY....................37
CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES....................................... 38
ARTICLE 25 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES............................38
25.1 Roles and responsibilities towards the Agency............................................................................... 38
25.2 Internal division of roles and responsibilities.................................................................................. 38
25.3 Internal arrangements between beneficiaries — Consortium agreement.........................................39
CHAPTER 6 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY — SANCTIONS
— DAMAGES — SUSPENSION — TERMINATION — FORCE MAJEURE................................ 39
SECTION 1 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY —
SANCTIONS.............................................................................................................................................. 39
ARTICLE 26 — REJECTION OF INELIGIBLE COSTS.............................................................................. 39
26.1 Conditions......................................................................................................................................... 39
26.2 Ineligible costs to be rejected — Calculation — Procedure............................................................40
26.3 Effects............................................................................................................................................... 40
ARTICLE 27 — REDUCTION OF THE GRANT......................................................................................... 40
27.1 Conditions......................................................................................................................................... 40
27.2 Amount to be reduced — Calculation — Procedure.......................................................................41
27.3 Effects............................................................................................................................................... 41
ARTICLE 28 — RECOVERY OF UNDUE AMOUNTS............................................................................... 41
28.1 Amount to be recovered — Calculation — Procedure....................................................................41
ARTICLE 29 — ADMINISTRATIVE SANCTIONS..................................................................................... 43
SECTION 2 LIABILITY FOR DAMAGES.........................................................................................................43
ARTICLE 30 — LIABILITY FOR DAMAGES.............................................................................................43
30.1 Liability of the Agency.................................................................................................................... 43
30.2 Liability of the beneficiaries............................................................................................................ 44
SECTION 3 SUSPENSION AND TERMINATION............................................................................................44
ARTICLE 31 — SUSPENSION OF PAYMENT DEADLINE....................................................................... 44
31.1 Conditions......................................................................................................................................... 44
31.2 Procedure.......................................................................................................................................... 44
ARTICLE 32 — SUSPENSION OF PAYMENTS.......................................................................................... 44
32.1 Conditions......................................................................................................................................... 44
32.2 Procedure.......................................................................................................................................... 45
ARTICLE 33 — SUSPENSION OF THE ACTION IMPLEMENTATION................................................... 45
7
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
33.1 Suspension of the action implementation, by the beneficiaries.......................................................45
33.2 Suspension of the action implementation, by the Agency...............................................................46
ARTICLE 34 — TERMINATION OF THE AGREEMENT OR OF THE PARTICIPATION OF ONE OR
MORE BENEFICIARIES..............................................................................................................47
34.1 Termination of the Agreement, by the beneficiaries........................................................................47
34.2 Termination of the participation of one or more beneficiaries, by the beneficiaries........................48
34.3 Termination of the Agreement or of the participation of one or more beneficiaries, by the
Agency..............................................................................................................................................49
SECTION 4 FORCE MAJEURE.......................................................................................................................... 51
ARTICLE 35 — FORCE MAJEURE.............................................................................................................. 52
CHAPTER 7 FINAL PROVISIONS...........................................................................................................................52
ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES...............................................................52
36.1 Form and means of communication.................................................................................................52
36.2 Date of communication.................................................................................................................... 53
36.3 Addresses for communication.......................................................................................................... 53
ARTICLE 37 — INTERPRETATION OF THE AGREEMENT.....................................................................53
37.1 Precedence of the Terms and Conditions over the Annexes............................................................53
37.2 Privileges and immunities................................................................................................................ 54
ARTICLE 38 — CALCULATION OF PERIODS, DATES AND DEADLINES........................................... 54
ARTICLE 39 — AMENDMENTS TO THE AGREEMENT......................................................................... 54
39.1 Conditions......................................................................................................................................... 54
39.2 Procedure.......................................................................................................................................... 54
ARTICLE 40 — ACCESSION TO THE AGREEMENT............................................................................... 55
40.1 Accession of the beneficiaries mentioned in the preamble..............................................................55
40.2 Addition of new beneficiaries.......................................................................................................... 55
ARTICLE 41 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES.............................................. 55
41.1 Applicable law..................................................................................................................................55
41.2 Dispute settlement............................................................................................................................ 55
ARTICLE 42 — ENTRY INTO FORCE OF THE AGREEMENT................................................................ 56
8
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
CHAPTER 1 GENERAL
ARTICLE 1 — SUBJECT OF THE AGREEMENT
This Agreement sets out the rights and obligations and the terms and conditions applicable to the grant
awarded to the beneficiaries for implementing the action set out in Chapter 2.
CHAPTER 2 ACTION
ARTICLE 2 — ACTION TO BE IMPLEMENTED
The grant is awarded for the action entitled ‘Towards the European Health DAta Space Joint
Action — TEHDAS’ (‘action’), as described in Annex 1.
ARTICLE 3 — DURATION AND STARTING DATE OF THE ACTION
The duration of the action will be 30 months as of 01/02/2021 (‘starting date of the action’).
ARTICLE 4 — ESTIMATED BUDGET AND BUDGET TRANSFERS
4.1 Estimated budget
The ‘estimated budget’ for the action is set out in Annex 2.
It contains the estimated eligible costs and the forms of costs, broken down by beneficiary (and
affiliated entity) and budget category (see Articles 5, 6 and 11).
4.2 Budget transfers
The estimated budget breakdown indicated in Annex 2 may be adjusted — without an amendment
(see Article 39) — by transfers of amounts between beneficiaries, budget categories and/or forms of
costs set out in Annex 2, if the action is implemented as described in Annex 1.
However, the beneficiaries may not add costs relating to subcontracts not provided for in Annex 1,
unless such additional subcontracts are approved by an amendment or in accordance with Article 10.
CHAPTER 3 GRANT
ARTICLE 5 — GRANT AMOUNT, FORM OF GRANT, REIMBURSEMENT RATE AND
FORMS OF COSTS
5.1 Maximum grant amount
The ‘maximum grant amount’ is EUR 2 500 000.00 (two million five hundred thousand EURO).
5.2 Form of grant, reimbursement rate and forms of costs
9
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
The grant reimburses 60% of the action's eligible costs (see Article 6) (‘reimbursement of eligible
costs grant’) (see Annex 2).
The estimated eligible costs of the action are EUR 4 166 666.67 (four million one hundred and sixty
six thousand six hundred and sixty six EURO and sixty seven eurocents).
Eligible costs (see Article 6) must be declared under the following forms ('forms of costs' or 'costs
forms'):
(a) for direct personnel costs: as actually incurred costs (actual costs);
(b) for direct costs of subcontracting: as actually incurred costs (actual costs);
(c) for other direct costs: as actually incurred costs (actual costs);
(d) for indirect costs: on the basis of a flat-rate applied as set out in Article 6.2.D (‘flat-rate costs’);
5.3 Final grant amount — Calculation
The ‘final grant amount’ depends on the actual extent to which the action is implemented in
accordance with the Agreement’s terms and conditions.
This amount is calculated by the Agency — when the payment of the balance is made — in the
following steps:
Step 1 – Application of the reimbursement rate to the eligible costs
Step 2 – Limit to the maximum grant amount
Step 3 – Reduction due to the no-profit rule
Step 4 – Reduction due to substantial errors, irregularities or fraud or serious breach of obligations
5.3.1 Step 1 — Application of the reimbursement rate to the eligible costs
The reimbursement rate (see Article 5.2) is applied to the eligible costs (actual costs and flat-rate costs;
see Article 6) declared by the beneficiaries and affiliated entities (see Article 15) and approved by
the Agency (see Article 16).
5.3.2 Step 2 — Limit to the maximum grant amount
If the amount obtained following Step 1 is higher than the maximum grant amount set out in
Article 5.1, it will be limited to the latter.
5.3.3 Step 3 — Reduction due to the no-profit rule
The grant must not produce a profit.
‘Profit’ means the surplus of the amount obtained following Steps 1 and 2 plus the action’s total
receipts, over the action’s total eligible costs.
The ‘action’s total eligible costs’ are the consolidated total eligible costs approved by the Agency.
10
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
The ‘action’s total receipts’ are the consolidated total receipts generated during its duration (see
Article 3).
The following are considered receipts:
(a) income generated by the action;
(b) financial contributions given by third parties to the beneficiary or to an affiliated entity
specifically to be used for costs that are eligible under the action.
The following are however not considered receipts:
(a) financial contributions by third parties, if they may be used to cover costs other than the eligible
costs (see Article 6);
(b) financial contributions by third parties with no obligation to repay any amount unused at the
end of the period set out in Article 3.
If there is a profit, it will be deducted in proportion to the final rate of reimbursement of the eligible
actual costs approved by the Agency (as compared to the amount calculated following Steps 1 and 2).
5.3.4 Step 4 — Reduction due to substantial errors, irregularities or fraud or serious breach
of obligations
If the grant is reduced (see Article 27), the Agency will calculate the reduced grant amount by
deducting the amount of the reduction (calculated in proportion to the seriousness of the errors,
irregularities or fraud or breach of obligations, in accordance with Article 27.2) from the maximum
grant amount set out in Article 5.1.
The final grant amount will be the lower of the following two:
- the amount obtained following Steps 1 to 3 or
- the reduced grant amount following Step 4.
5.4 Revised final grant amount — Calculation
If — after the payment of the balance (in particular, after checks, reviews, audits or investigations;
see Article 17) — the Agency rejects costs (see Article 26) or reduces the grant (see Article 27), it
will calculate the ‘revised final grant amount’ for the action or for the beneficiary concerned.
This amount is calculated by the Agency on the basis of the findings, as follows:
- in case of rejection of costs: by applying the reimbursement rate to the revised eligible costs
approved by the Agency for the beneficiary concerned;
- in case of reduction of the grant: by deducting the amount of the reduction (calculated in
proportion to the seriousness of the errors, irregularities or fraud or breach of obligations, in
accordance with Article 27.2) from the maximum grant amount set out in Article 5.1 or from the
maximum EU contribution indicated for the beneficiary in the estimated budget (see Annex 2).
In case of rejection of costs and reduction of the grant, the revised final grant amount will be the
lower of the two amounts above.
11
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS
6.1 General conditions for costs to be eligible
‘Eligible costs’ are costs that meet the following criteria:
(a) for actual costs:
(i) they must be actually incurred by the beneficiary;
(ii) they must be incurred in the period set out in Article 3, with the exception of costs relating
to the submission of the periodic report for the last reporting period and the final report
(see Article 15);
(iii) they must be indicated in the estimated budget set out in Annex 2;
(iv) they must be incurred in connection with the action as described in Annex 1 and necessary
for its implementation;
(v) they must be identifiable and verifiable, in particular recorded in the beneficiary’s accounts
in accordance with the accounting standards applicable in the country where the beneficiary
is established and with the beneficiary’s usual cost accounting practices;
(vi) they must comply with the applicable national law on taxes, labour and social security, and
(vii) they must be reasonable, justified and must comply with the principle of sound financial
management, in particular regarding economy and efficiency;
(b) for unit costs: not applicable;
(c) for flat-rate costs:
(i) they must be calculated by applying the flat-rate set out in Annex 2, and
(ii) the costs (actual costs) to which the flat-rate is applied must comply with the conditions for
eligibility set out in this Article.
(d) for lump sum costs: not applicable;
6.2 Specific conditions for costs to be eligible
Costs are eligible if they comply with the general conditions (see above) and the specific conditions
set out below, for each of the following budget categories:
A. direct personnel costs;
B. direct costs of subcontracting;
C. other direct costs;
D. indirect costs;
‘Direct costs’ are costs that are directly linked to the action implementation and can therefore be
attributed to it directly. They must not include any indirect costs (see Point D below).
12
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
‘Indirect costs’ are costs that are not directly linked to the action implementation and therefore cannot
be attributed directly to it.
A. Direct personnel costs
Types of eligible personnel costs
A.1 Personnel costs are eligible if they are related to personnel working for the beneficiary under an
employment contract (or equivalent appointing act) and assigned to the action (‘costs for employees
(or equivalent)’). They must be limited to salaries, social security contributions, taxes and other
costs included in the remuneration, if they arise from national law or the employment contract (or
equivalent appointing act).
They may also include additional remuneration for personnel assigned to the action (including
payments on the basis of supplementary contracts regardless of their nature), if:
(a) it is part of the beneficiary’s usual remuneration practices and is paid in a consistent manner
whenever the same kind of work or expertise is required;
(b) the criteria used to calculate the supplementary payments are objective and generally applied
by the beneficiary, regardless of the source of funding used.
A.2 The costs for natural persons working under a direct contract with the beneficiary other than
an employment contract or seconded by a third party against payment are eligible personnel costs,
if:
(a) the person works under the beneficiary’s instructions and, unless otherwise agreed with the
beneficiary, on the beneficiary’s premises;
(b) the result of the work carried out belongs to the beneficiary, and
(c) the costs are not significantly different from those for personnel performing similar tasks under
an employment contract with the beneficiary.
Calculation
Personnel costs must be calculated by the beneficiaries as follows:
- for persons working exclusively on the action:
{monthly rate for the person
multiplied by
number of actual months worked on the action}.
The months declared for these persons may not be declared for any other EU or Euratom grant.
The ‘monthly rate’ is calculated as follows:
{annual personnel costs for the person
divided by
12}
13
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
using the personnel costs for each full financial year covered by the reporting period concerned.
If a financial year is not closed at the end of the reporting period, the beneficiaries must use the
monthly rate of the last closed financial year available.
- for all other persons:
{daily rate for the person
multiplied by
number of actual days worked on the action (rounded up or down to the nearest half-day)}.
The number of actual days declared for a person must be identifiable and verifiable (see
Article 13).
The total number of days declared in EU or Euratom grants, for a person for a year, cannot be
higher than the annual productive days used for the calculations of the daily rate. Therefore,
the maximum number of days that can be declared for the grant are:
{number of annual productive days for the year (see below)
minus
total number of days declared by the beneficiary, for that person for that year, for other EU or Euratom
grants}.
The ‘daily rate’ is calculated as follows:
{annual personnel costs for the person
divided by
number of individual annual productive days}
using the personnel costs and the number of annual productive days for each full financial
year covered by the reporting period concerned. If a financial year is not closed at the end of
the reporting period, the beneficiaries must use the daily rate of the last closed financial year
available.
The ‘number of individual annual productive days’ is the total actual days worked by the person
in the year. It may not include holidays and other absences (such as sick leave, maternity leave,
special leave, etc). However, it may include overtime and time spent in meetings, trainings and
other similar activities.
B. Direct costs of subcontracting (including related duties, taxes and charges, such as non-
deductible value added tax (VAT) paid by beneficiaries that are not public bodies acting as public
authority) are eligible if the conditions in Article 10.1.1 are met.
C. Other direct costs
C.1 Travel costs and related subsistence allowances (including related duties, taxes and charges,
such as non-deductible value added tax (VAT) paid by beneficiaries that are not public bodies acting
as public authority) are eligible if they are in line with the beneficiary’s usual practices on travel.
C.2 The depreciation costs of equipment, infrastructure or other assets (new or second-hand)
as recorded in the beneficiary’s accounts are eligible, if they were purchased in accordance
14
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
with Article 9.1.1 and written off in accordance with international accounting standards and the
beneficiary’s usual accounting practices.
The costs of renting or leasing equipment, infrastructure or other assets (including related duties,
taxes and charges, such as non-deductible value added tax (VAT) paid by beneficiaries that are not
public bodies acting as public authority) are also eligible, if they do not exceed the depreciation costs
of similar equipment, infrastructure or assets and do not include any financing fees.
The only portion of the costs that will be taken into account is that which corresponds to the duration
of the action and rate of actual use for the purposes of the action.
C.3 Costs of other goods and services (including related duties, taxes and charges, such as non-
deductible value added tax (VAT) paid by beneficiaries that are not public bodies acting as public
authority) are eligible, if they are purchased specifically for the action and in accordance with
Article 9.1.1.
Such goods and services include, for instance, consumables and supplies, dissemination, protection
of results, certificates on the financial statements (if they are required by the Agreement), translations
and publications.
D. Indirect costs
Indirect costs are eligible if they are declared on the basis of the flat-rate of 7% of the eligible direct
costs (see Article 5.2 and Points A to C above).
Beneficiaries receiving an operating grant1 financed by the EU or Euratom budget cannot declare
indirect costs for the period covered by the operating grant.
6.3 Conditions for costs of affiliated entities to be eligible
Costs incurred by affiliated entities are eligible if they fulfil — mutatis mutandis — the general and
specific conditions for eligibility set out in this Article (Article 6.1 and 6.2) and Article 11.1.1.
6.4 Ineligible costs
‘Ineligible costs’ are:
(a) costs that do not comply with the conditions set out above (Article 6.1 to 6.3), in particular:
(i) costs related to return on capital;
(ii) debt and debt service charges;
(iii) provisions for future losses or debts;
(iv) interest owed;
1 For the definition, see Article 121(1)(b) of Regulation (EU, Euratom) No 966/2012 of the European Parliament and
of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing
Council Regulation (EC, Euratom) No 1605/2002 (OJ L 218, 26.10.2012, p.1) (‘Financial Regulation No 966/2012’):
‘operating grant’ means direct financial contribution, by way of donation, from the budget in order to finance the
functioning of a body which pursues an aim of general EU interest or has an objective forming part of and supporting
an EU policy.
15
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
(v) doubtful debts;
(vi) currency exchange losses;
(vii) bank costs charged by the beneficiary’s bank for transfers from the Agency;
(viii) excessive or reckless expenditure;
(ix) deductible VAT;
(x) costs incurred during suspension of the implementation of the action (see Article 33);
(xi) in-kind contributions provided by third parties;
(b) costs declared under another EU or Euratom grant (including grants awarded by a Member
State and financed by the EU or Euratom budget and grants awarded by bodies other than the
Agency for the purpose of implementing the EU or Euratom budget); in particular, indirect
costs if the beneficiary is already receiving an operating grant financed by the EU or Euratom
budget in the same period;
(c) costs for staff of a national (or local) administration, for activities that are part of the
administration’s normal activities (i.e. not undertaken only because of the grant);
(d) costs (especially travel and subsistence costs) for staff or representatives of EU institutions,
bodies or agencies.
6.5 Consequences of declaration of ineligible costs
Declared costs that are ineligible will be rejected (see Article 26).
This may also lead to any of the other measures described in Chapter 6.
CHAPTER 4 RIGHTS AND OBLIGATIONS OF THE PARTIES
SECTION 1 RIGHTS AND OBLIGATIONS RELATED TO IMPLEMENTING THE
ACTION
ARTICLE 7 — GENERAL OBLIGATION TO PROPERLY IMPLEMENT THE ACTION
7.1 General obligation to properly implement the action
The beneficiaries must implement the action as described in Annex 1 and in compliance with the
provisions of the Agreement and all legal obligations under applicable EU, international and national
law.
7.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
16
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD PARTIES
INVOLVED IN THE ACTION
The beneficiaries must have the appropriate resources to implement the action.
If it is necessary to implement the action, the beneficiaries may:
- purchase goods, works and services (see Article 9);
- call upon subcontractors to implement action tasks described in Annex 1 (see Article 10);
- call upon affiliated entities to implement action tasks described in Annex 1 (see Article 11).
In these cases, the beneficiaries retain sole responsibility towards the Agency and the other
beneficiaries for implementing the action.
ARTICLE 8a — IMPLEMENTATION OF ACTION TASKS BY BENEFICIARIES NOT
RECEIVING EU FUNDING
Not applicable
ARTICLE 9 — PURCHASE OF GOODS, WORKS OR SERVICES
9.1 Rules for purchasing goods, works or services
9.1.1 If necessary to implement the action, the beneficiaries may purchase goods, works or services.
The beneficiaries must make such purchases ensuring the best value for money or, if appropriate, the
lowest price. In doing so, they must avoid any conflict of interests (see Article 20).
The beneficiaries must ensure that the Agency, the Commission, the European Court of Auditors
(ECA) and the European Anti-fraud Office (OLAF) can exercise their rights under Articles 17 and
18 also towards their contractors.
9.1.2 Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC2 (or
2014/24/EU3) or ‘contracting entities’ within the meaning of Directive 2004/17/EC4 (or 2014/25/EU5)
must comply with the applicable national law on public procurement.
9.2 Consequences of non-compliance
2 Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of
procedures for the award of public work contracts, public supply contracts and public service contracts (OJ L 134,
30.04.2004, p. 114).
3 Directive 2014/24/EU of the European Parliament and of the Council of 26 February 2014 on public procurement and
repealing Directive 2004/18/EC (OJ L 94, 28.3.2014, p. 65).
4 Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the procurement
procedures of entities operating in the water, energy, transport and postal services sectors (OJ L 134, 30.04.2004, p. 1).
5 Directive 2014/25/EU of the European Parliament and of the Council of 26 February 2014 on procurement by entities
operating in the water, energy, transport and postal services sectors and repealing Directive 2004/17/EC (OJ L 94,
28.3.2014, p. 243).
17
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
If a beneficiary breaches any of its obligations under Article 9.1.1, the costs related to the contract
concerned will be ineligible (see Article 6) and will be rejected (see Article 26).
If a beneficiary breaches any of its obligations under Article 9.1.2, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 10 — IMPLEMENTATION OF ACTION TASKS BY SUBCONTRACTORS
10.1 Rules for subcontracting action tasks
10.1.1 If necessary to implement the action, the beneficiaries may award subcontracts covering the
implementation of certain action tasks described in Annex 1.
Subcontracting may cover only a limited part of the action.
The beneficiaries must award the subcontracts ensuring the best value for money or, if appropriate,
the lowest price. In doing so, they must avoid any conflict of interests (see Article 20).
The tasks to be implemented and the estimated cost for each subcontract must be set out in Annex
1 and the total estimated costs of subcontracting per beneficiary must be set out in Annex 2. The
Agency may however approve subcontracts not set out in Annex 1 and 2 without amendment (see
Article 39), if:
- they are specifically justified in the periodic technical report and
- they do not entail changes to the Agreement which would call into question the decision
awarding the grant or breach the principle of equal treatment of applicants.
The beneficiaries must ensure that the Agency, the Commission, the European Court of Auditors
(ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 17 and
18 also towards their subcontractors.
10.1.2 The beneficiaries must ensure that their obligations under Articles 20, 21, 22 and 30 also apply
to the subcontractors.
Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC (or
2014/24/EU) or ‘contracting entities’ within the meaning of Directive 2004/17/EC (or 2014/25/EU)
must comply with the applicable national law on public procurement.
10.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under Article 10.1.1, the costs related to the subcontract
concerned will be ineligible (see Article 6) and will be rejected (see Article 26).
If a beneficiary breaches any of its obligations under Article 10.1.2, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 11 — IMPLEMENTATION OF ACTION TASKS BY AFFILIATED ENTITIES
18
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
11.1 Rules for calling upon affiliated entities to implement part of the action
11.1.1 The following 'affiliated entities'6 may implement the action tasks attributed to them in
Annex 1:
- TEKNOLOGIAN TUTKIMUSKESKUS VTT OY (VTT), affiliated or linked to Sitra
- TERVEYDEN JA HYVINVOINNIN LAITOS (THL), affiliated or linked to Sitra
- CSC-TIETEEN TIETOTEKNIIKAN KESKUS OY (CSC), affiliated or linked to Sitra
- HRVATSKI ZAVOD ZA JAVNO ZDRAVSTVO (CIPH), affiliated or linked to CHIF
- MIDTJYLLANDS EU KONTOR FORENING (CDEU), affiliated or linked to RM
- UNIVERSITE PAUL SABATIER TOULOUSE III (UT3), affiliated or linked to FR-HDH
- UNIVERSITE D'AIX MARSEILLE (AMU), affiliated or linked to FR-HDH
- INSTITUT NATIONAL DE LA SANTE ET DE LA RECHERCHE MEDICALE (Inserm),
affiliated or linked to FR-HDH
- HOSPICES CIVILS DE LYON (HCL), affiliated or linked to FR-HDH
- AGENCE DU NUMÉRIQUE EN SANTÉ (ANS), affiliated or linked to FR-HDH
- BUNDESINSTITUT FUR ARZNEIMITTEL UND MEDIZINPRODUKTE (FDZ), affiliated or
linked to BMG
- GEMATIK GMBH (GEMATIK), affiliated or linked to BMG
- SEMMELWEIS EGYETEM (SU), affiliated or linked to OKFŐ
- THE HEALTH RESEARCH BOARD (HRB), affiliated or linked to DoH-IE
- STICHTING NATIONAAL ICT INSTITUUT IN DE ZORG (Nictiz), affiliated or linked to
VWS
- DIREKTORAT FOR E-HELSE (E-helse), affiliated or linked to MoH-NO
- FOLKEHELSEINSTITUTTET (FHI), affiliated or linked to MoH-NO
- HELSEDIREKTORATET (Hdir), affiliated or linked to MoH-NO
- FOLKHALSOMYNDIGHETEN (PHAS), affiliated or linked to SEHA
6 For the definition, see Article 122 of the Financial Regulation (EU, Euratom) No 966/2012: entities affiliated to the
beneficiary are:
(a) entities that form a ‘sole beneficiary’ (i.e. where an entity is formed of several entities that satisfy the criteria for
being awarded a grant, including where the entity is specifically established for the purpose of implementing
an action to be financed by a grant);
(b) entities that satisfy the eligibility criteria and that do not fall within one of the situations referred to in Article
131(4) and that have a link with the beneficiary, in particular a legal or capital link, which is neither limited to
the action nor established for the sole purpose of its implementation.
19
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
- SOCIALSTYRELSEN (NBHW), affiliated or linked to SEHA
- GENOME RESEARCH LIMITED (WSI ), affiliated or linked to NHSC
The affiliated entities may declare as eligible the costs they incur for implementing the action tasks
in accordance with Article 6.3.
The beneficiaries must ensure that the Agency, the Commission, the European Court of Auditors
(ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 17 and
18 also towards their affiliated entities.
11.1.2 The beneficiaries must ensure that their obligations under Articles 13, 15, 20, 21 and 22 also
apply to their affiliated entities.
11.2 Consequences of non-compliance
If any obligation under Article 11.1.1 is breached, the costs of the affiliated entity will be ineligible
(see Article 6) and will be rejected (see Article 26).
If any obligation under Article 11.1.2 is breached, the grant may be reduced (see Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 11a — FINANCIAL SUPPORT TO THIRD PARTIES
Not applicable
SECTION 2 RIGHTS AND OBLIGATIONS RELATED TO THE GRANT
ADMINISTRATION
ARTICLE 12 — GENERAL OBLIGATION TO INFORM
12.1 General obligation to provide information upon request
The beneficiaries must provide — during implementation of the action or afterwards and in accordance
with Article 25.2 — any information requested in order to verify eligibility of the costs, proper
implementation of the action and compliance with any other obligation under the Agreement.
12.2 Obligation to keep information up to date and to inform about events and
circumstances likely to affect the Agreement
Each beneficiary must keep information stored in the Participant Portal Beneficiary Register (via
the electronic exchange system; see Article 36) up to date, in particular, its name, address, legal
representatives, legal form and organisation type.
Each beneficiary must immediately inform the coordinator — which must immediately inform the
Agency and the other beneficiaries — of any of the following:
(a) events which are likely to affect significantly or delay the implementation of the action or the
EU’s financial interests, in particular:
20
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
(i) changes in its legal, financial, technical, organisational or ownership situation or those
of its affiliated entities and
(ii) changes in the name, address, legal form, organisation type of its affiliated entities;
(b) circumstances affecting:
(i) the decision to award the grant or
(ii) compliance with requirements under the Agreement.
12.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 13 — KEEPING RECORDS — SUPPORTING DOCUMENTATION
13.1 Obligation to keep records and other supporting documentation
The beneficiaries must — for a period of five years after the payment of the balance — keep records
and other supporting documentation, in order to prove the proper implementation of the action and
the costs they declare as eligible.
They must make them available upon request (see Article 12) or in the context of checks, reviews,
audits or investigations (see Article 17).
If there are on-going checks, reviews, audits, investigations, litigation or other pursuits of claims under
the Agreement (including the extension of findings; see Article 17), the beneficiaries must keep the
records and other supporting documentation until the end of these procedures.
The beneficiaries must keep the original documents. Digital and digitalised documents are considered
originals if they are authorised by the applicable national law. The Agency may accept non-original
documents if it considers that they offer a comparable level of assurance.
13.1.1 Records and other supporting documentation on the technical implementation
The beneficiaries must keep records and other supporting documentation on the technical
implementation of the action, in line with the accepted standards in the respective field.
13.1.2 Records and other documentation to support the costs declared
The beneficiaries must keep the records and documentation supporting the costs declared, in particular
the following:
(a) for actual costs: adequate records and other supporting documentation to prove the costs
declared, such as contracts, subcontracts, invoices and accounting records. In addition, the
beneficiaries’ usual cost accounting practices and internal control procedures must enable direct
21
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
reconciliation between the amounts declared, the amounts recorded in their accounts and the
amounts stated in the supporting documentation;
(b) for unit costs: not applicable;
(c) for flat-rate costs: adequate records and other supporting documentation to prove the eligibility
of the costs to which the flat-rate is applied. The beneficiaries do not need to identify the costs
covered or provide supporting documentation (such as accounting statements) to prove the
amount declared at a flat-rate;
(d) for lump sum costs: not applicable;
In addition, for personnel costs (declared as actual costs), the beneficiaries must keep time records
for the number of days declared. The time records must be in writing and approved by the persons
working on the action and their supervisors, at least monthly. In the absence of reliable time records
of the days worked on the action, the Agency may accept alternative evidence supporting the number
of days declared, if it considers that it offers an adequate level of assurance.
As an exception, for persons working exclusively on the action, there is no need to keep time records,
if the beneficiary signs a declaration confirming that the persons concerned have worked exclusively
on the action.
For costs declared by affiliated entities (see Article 11), it is the beneficiary that must keep the originals
of the financial statements and the certificates on the financial statements of its affiliated entities.
13.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, costs insufficiently substantiated
will be ineligible (see Article 6) and will be rejected (see Article 26), and the grant may be reduced
(see Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 14 — SUBMISSION OF DELIVERABLES
14.1 Obligation to submit deliverables
The coordinator must submit the ‘deliverables’ identified in Annex 1, in accordance with the timing
and conditions set out in it.
14.2 Consequences of non-compliance
If the coordinator breaches any of its obligations under this Article, the Agency may apply any of the
measures described in Chapter 6.
ARTICLE 15 — REPORTING — PAYMENT REQUESTS
15.1 Obligation to submit reports
The coordinator must submit to the Agency (see Article 36) the technical and financial report(s) set
22
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
out in this Article. These reports include request(s) for payment and must be drawn up using the forms
and templates provided in the electronic exchange system (see Article 36).
15.2 Reporting periods
The action is divided into the following ‘reporting periods’:
- RP1: from month 1 to month 15
- RP2: from month 16 to month 30
15.2a Request(s) for further pre-financing payment(s)
Not applicable
15.3 Periodic reports — Requests for interim payments
The coordinator must submit a periodic report within 60 days following the end of each reporting
period.
The periodic report must include the following:
(a) a ‘periodic technical report’ containing:
(i) an explanation of the work carried out by the beneficiaries;
(ii) an overview of the progress towards the objectives of the action, including milestones
and deliverables identified in Annex 1.
This report must include explanations justifying the differences between work expected
to be carried out in accordance with Annex 1 and that actually carried out;
(iii) a summary for publication by the Agency;
(iv) the answers to the ‘questionnaire’: covering issues related to the action implementation
and its impact;
(b) a ‘periodic financial report’ containing:
(i) an ‘individual financial statement’ (see Annex 4) from each beneficiary and from each
affiliated entity, for the reporting period concerned.
The individual financial statement must detail the eligible costs (actual costs and flat-rate
costs; see Article 6) for each budget category (see Annex 2).
The beneficiaries and affiliated entities must declare all eligible costs, even if — for
actual costs and flat-rate costs — they exceed the amounts indicated in the estimated
budget (see Annex 2). Amounts which are not declared in the individual financial
statement will not be taken into account by the Agency.
If an individual financial statement is not submitted for a reporting period, it may be
included in the periodic financial report for the next reporting period.
23
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
The individual financial statements of the last reporting period must also detail the
receipts of the action (see Article 5.3.3).
Each beneficiary and each affiliated entity must certify that:
- the information provided is full, reliable and true;
- the costs declared are eligible (see Article 6);
- the costs can be substantiated by adequate records and supporting documentation
(see Article 13) that will be produced upon request (see Article 12) or in the context
of checks, reviews, audits and investigations (see Article 17), and
- for the last reporting period: that all the receipts have been declared (see
Article 5.3.3);
(ii) an explanation of the use of resources and the information on subcontracting (see
Article 10) from each beneficiary and from each affiliated entity, for the reporting period
concerned;
(iii) not applicable;
(iv) a ‘periodic summary financial statement’, created automatically by the electronic
exchange system, consolidating the individual financial statements for the reporting
period concerned and including — except for the last reporting period — the request
for interim payment;
(v) a ‘certificate on the financial statements’ (drawn up in accordance with Annex 5) for
each beneficiary and for each affiliated entity, if:
- the (cumulative) amount of EU contribution it requests as reimbursement of actual
costs (and for which no certificate has yet been submitted) is EUR 150 000 or
more and
- the maximum EU contribution indicated, for that beneficiary or affiliated entity,
in the estimated budget (see Annex 2) as reimbursement of actual costs is
EUR 200 000 or more.
15.4 Final report — Request for payment of the balance
In addition to the periodic report for the last reporting period, the coordinator must submit the final
report within 60 days following the end of the last reporting period.
The final report must include the following:
(a) a ‘final technical report’ with a summary for publication containing:
(i) an overview of the results and their dissemination;
(ii) the conclusions on the action and
(iii) the impact of the action;
24
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
(b) a ‘final financial report’ containing a ‘final summary financial statement’, created
automatically by the electronic exchange system, consolidating the individual financial
statements for all reporting periods and including the request for payment of the balance.
15.5 Information on cumulative expenditure incurred
Not applicable
15.6 Currency for financial statements and conversion into euro
Financial statements must be drafted in euro.
Beneficiaries and affiliated entities with accounting established in a currency other than the euro
must convert the costs recorded in their accounts into euro at the average of the daily exchange
rates published in the C series of the Official Journal of the European Union, calculated over the
corresponding reporting period.
If no daily euro exchange rate is published in the Official Journal of the European Union for the
currency in question, they must be converted at the average of the monthly accounting rates published
on the Commission’s website, calculated over the corresponding reporting period.
Beneficiaries and affiliated entities with accounting established in euro must convert costs incurred
in another currency into euro according to their usual accounting practices.
15.7 Language of reports
All report(s) (including financial statements) must be submitted in the language of the Agreement.
15.8 Consequences of non-compliance
If the report(s) submitted do not comply with this Article, the Agency may suspend the payment
deadline (see Article 31) and apply any of the other measures described in Chapter 6.
If the coordinator breaches its obligation to submit the report(s) and if it fails to comply with this
obligation within 30 days following a written reminder, the Agency may terminate the Agreement
(see Article 34) or apply any of the other measures described in Chapter 6.
ARTICLE 16 — PAYMENTS AND PAYMENT ARRANGEMENTS
16.1 Payments to be made
The following payments will be made to the coordinator:
- a pre-financing payment;
- one or more interim payments, on the basis of the request(s) for interim payment (see
Article 15), and
- one payment of the balance, on the basis of the request for payment of the balance (see
Article 15).
16.2 Pre-financing payment — Amount
25
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
The aim of the pre-financing is to provide the beneficiaries with a float.
It remains the property of the EU until the payment of the balance.
The amount of the pre-financing payment will be EUR 1 250 000.00 (one million two hundred and
fifty thousand EURO).
The Agency will — except if Article 32 applies — make the pre-financing payment to the coordinator
within 30 days, either from the entry into force of the Agreement (see Article 42) or from 10 days
before the starting date of the action (see Article 3) , whichever is the latest.
16.3 Interim payments — Amount — Calculation
Interim payments reimburse the eligible costs incurred for the implementation of the action during
the corresponding reporting periods.
The Agency will pay to the coordinator the amount due as interim payment within 90 days from
receiving the periodic report (see Article 15.3), except if Articles 31 or 32 apply.
Payment is subject to the approval of the periodic report. Its approval does not imply recognition of
compliance, authenticity, completeness or correctness of its content.
The amount due as interim payment is calculated by the Agency in the following steps:
Step 1 – Application of the reimbursement rate
Step 2 – Limit to 90% of the maximum grant amount
16.3.1 Step 1 — Application of the reimbursement rate
The reimbursement rate (see Article 5.2) is applied to the eligible costs (actual costs and flat-rate costs;
see Article 6) declared by the beneficiaries and the affiliated entities (see Article 15) and approved by
the Agency (see above) for the concerned reporting period.
16.3.2 Step 2 — Limit to 90% of the maximum grant amount
The total amount of pre-financing and interim payments must not exceed 90% of the maximum grant
amount set out in Article 5.1. The maximum amount for the interim payment will be calculated as
follows:
{90% of the maximum grant amount (see Article 5.1)
minus
{pre-financing and previous interim payments}}.
16.4 Payment of the balance — Amount — Calculation
The payment of the balance reimburses the remaining part of the eligible costs incurred by the
beneficiaries for the implementation of the action.
If the total amount of earlier payments is greater than the final grant amount (see Article 5.3), the
payment of the balance takes the form of a recovery (see Article 28).
26
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
If the total amount of earlier payments is lower than the final grant amount, the Agency will pay the
balance within 90 days from receiving the final report (see Article 15.4), except if Articles 31 or 32
apply.
Payment is subject to the approval of the final report. Its approval does not imply recognition of
compliance, authenticity, completeness or correctness of its content.
The amount due as the balance is calculated by the Agency by deducting the total amount of pre-
financing and interim payments (if any) already made, from the final grant amount determined in
accordance with Article 5.3:
{final grant amount (see Article 5.3)
minus
{pre-financing and interim payments (if any) made}}.
If the balance is positive, it will be paid to the coordinator.
The amount to be paid may however be offset — without the beneficiaries’ consent — against any
other amount owed by a beneficiary to the Agency, the Commission or another executive agency
(under the EU or Euratom budget), up to the maximum EU contribution indicated, for that beneficiary,
in the estimated budget (see Annex 2).
If the balance is negative, it will be recovered from the coordinator (see Article 28).
16.5 Notification of amounts due
When making payments, the Agency will formally notify to the coordinator the amount due,
specifying that it concerns an interim payment or the payment of the balance.
For the payment of the balance, the notification will also specify the final grant amount.
In the case of reduction of the grant or recovery of undue amounts, the notification will be preceded
by the contradictory procedure set out in Articles 27 and 28.
16.6 Currency for payments
The Agency will make all payments in euro.
16.7 Payments to the coordinator — Distribution to the beneficiaries
Payments will be made to the coordinator.
Payments to the coordinator will discharge the Agency from its payment obligation.
The coordinator must distribute the payments between the beneficiaries without unjustified delay.
Pre-financing may however be distributed only:
(a) if 90% of the beneficiaries have acceded to the Agreement (see Article 40) and
(b) to beneficiaries that have acceded to the Agreement (see Article 40).
27
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
16.8 Bank account for payments
All payments will be made to the following bank account:
Name of bank: NORDEA BANK FINLAND PLC
Full name of the account holder: SUOMEN ITSENAISYYDEN JUHLARAHA
Full account number (including bank codes):
IBAN code: FI2412793000513180
16.9 Costs of payment transfers
The cost of the payment transfers is borne as follows:
- the Agency bears the cost of transfers charged by its bank;
- the beneficiary bears the cost of transfers charged by its bank;
- the party causing a repetition of a transfer bears all costs of the repeated transfer.
16.10 Date of payment
Payments by the Agency are considered to have been carried out on the date when they are debited
to its account.
16.11 Consequences of non-compliance
16.11.1 If the Agency does not pay within the payment deadlines (see above), the beneficiaries are
entitled to late-payment interest at the rate applied by the European Central Bank (ECB) for its main
refinancing operations in euros (‘reference rate’), plus three and a half points. The reference rate is
the rate in force on the first day of the month in which the payment deadline expires, as published in
the C series of the Official Journal of the European Union.
If the late-payment interest is lower than or equal to EUR 200, it will be paid to the coordinator only
upon request submitted within two months of receiving the late payment.
Late-payment interest is not due if all beneficiaries are EU Member States (including regional and
local government authorities or other public bodies acting on behalf of a Member State for the purpose
of this Agreement).
Suspension of the payment deadline or payments (see Articles 31 and 32) will not be considered as
late payment.
Late-payment interest covers the period running from the day following the due date for payment (see
above), up to and including the date of payment.
Late-payment interest is not considered for the purposes of calculating the final grant amount.
16.11.2 If the coordinator breaches any of its obligations under this Article, the grant may be reduced
(see Article 27) and the Agreement or the participation of the coordinator may be terminated (see
Article 34).
Such breaches may also lead to any of the other measures described in Chapter 6.
28
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
ARTICLE 17 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION
OF FINDINGS
17.1 Checks, reviews and audits by the Agency and the Commission
17.1.1 Right to carry out checks
The Agency or the Commission will — during the implementation of the action or afterwards — check
the proper implementation of the action and compliance with the obligations under the Agreement,
including assessing deliverables and reports.
For this purpose, the Agency or the Commission may be assisted by external persons or bodies.
The Agency or the Commission may also request additional information in accordance with Article 12.
The Agency or the Commission may request beneficiaries to provide such information to it directly.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
17.1.2 Right to carry out reviews
The Agency or the Commission may — during the implementation of the action or afterwards —
carry out reviews on the proper implementation of the action (including assessment of deliverables
and reports) and compliance with the obligations under the Agreement.
Reviews may be started up to five years after the payment of the balance. They will be formally
notified to the coordinator or beneficiary concerned and will be considered to have started on the date
of the formal notification.
If the review is carried out on a third party (see Articles 9 to 11a), the beneficiary concerned must
inform the third party.
The Agency or the Commission may carry out reviews directly (using its own staff) or indirectly (using
external persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned
of the identity of the external persons or bodies. They have the right to object to the appointment on
grounds of commercial confidentiality.
The coordinator or beneficiary concerned must provide — within the deadline requested — any
information and data in addition to deliverables and reports already submitted (including information
on the use of resources). The Agency or the Commission may request beneficiaries to provide such
information to it directly.
The coordinator or beneficiary concerned may be requested to participate in meetings, including with
external experts.
For on-the-spot reviews, the beneficiaries must allow access to their sites and premises, including to
external persons or bodies, and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
On the basis of the review findings, a ‘review report’ will be drawn up.
29
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
The Agency or the Commission will formally notify the review report to the coordinator or beneficiary
concerned, which has 30 days to formally notify observations (‘contradictory review procedure’).
Reviews (including review reports) are in the language of the Agreement.
17.1.3 Right to carry out audits
The Agency or the Commission may — during the implementation of the action or afterwards —
carry out audits on the proper implementation of the action and compliance with the obligations under
the Agreement.
Audits may be started up to five years after the payment of the balance. They will be formally
notified to the coordinator or beneficiary concerned and will be considered to have started on the date
of the formal notification.
If the audit is carried out on a third party (see Articles 9 to 11a), the beneficiary concerned must inform
the third party.
The Agency or the Commission may carry out audits directly (using its own staff) or indirectly (using
external persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned
of the identity of the external persons or bodies. They have the right to object to the appointment on
grounds of commercial confidentiality.
The coordinator or beneficiary concerned must provide — within the deadline requested — any
information (including complete accounts, individual salary statements or other personal data) to
verify compliance with the Agreement. The Agency or the Commission may request beneficiaries to
provide such information to it directly.
For on-the-spot audits, the beneficiaries must allow access to their sites and premises, including to
external persons or bodies, and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
On the basis of the audit findings, a ‘draft audit report’ will be drawn up.
The Agency or the Commission will formally notify the draft audit report to the coordinator or
beneficiary concerned, which has 30 days to formally notify observations (‘contradictory audit
procedure’). This period may be extended by the Agency or the Commission in justified cases.
The ‘final audit report’ will take into account observations by the coordinator or beneficiary
concerned. The report will be formally notified to it.
Audits (including audit reports) are in the language of the Agreement.
The Agency or the Commission may also access the beneficiaries’ statutory records for the periodical
assessment of flat-rate amounts.
17.2 Investigations by the European Anti-Fraud Office (OLAF)
30
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
Under Regulations No 883/20137 and No 2185/968 (and in accordance with their provisions and
procedures), the European Anti-Fraud Office (OLAF) may — at any moment during implementation
of the action or afterwards — carry out investigations, including on-the-spot checks and inspections,
to establish whether there has been fraud, corruption or any other illegal activity affecting the financial
interests of the EU.
17.3 Checks and audits by the European Court of Auditors (ECA)
Under Article 287 of the Treaty on the Functioning of the European Union (TFEU) and Article 161 of
the Financial Regulation No 966/20129, the European Court of Auditors (ECA) may — at any moment
during implementation of the action or afterwards — carry out audits.
The ECA has the right of access for the purpose of checks and audits.
17.4 Checks, reviews, audits and investigations for international organisations
Not applicable
17.5 Consequences of findings in checks, reviews, audits and investigations — Extension of
findings
17.5.1 Findings in this grant
Findings in checks, reviews, audits or investigations carried out in the context of this grant may lead
to the rejection of ineligible costs (see Article 26), reduction of the grant (see Article 27), recovery of
undue amounts (see Article 28) or to any of the other measures described in Chapter 6.
Rejection of costs or reduction of the grant after the payment of the balance will lead to a revised final
grant amount (see Article 5.4).
Findings in checks, reviews, audits or investigations may lead to a request for amendment for the
modification of Annex 1 (see Article 39).
Checks, reviews, audits or investigations that find systemic or recurrent errors, irregularities, fraud or
breach of obligations may also lead to consequences in other EU or Euratom grants awarded under
similar conditions (‘extension of findings from this grant to other grants’).
Moreover, findings arising from an OLAF investigation may lead to criminal prosecution under
national law.
17.5.2 Findings in other grants
7 Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013
concerning investigations conducted by the European Anti-Fraud Office (OLAF) and repealing Regulation (EC)
No 1073/1999 of the European Parliament and of the Council and Council Regulation (Euratom) No 1074/1999 (OJ
L 232, 18.09.2013, p. 1).
8 Council Regulation (Euratom, EC) No 2185/1996 of 11 November 1996 concerning on-the-spot checks and inspections
carried out by the Commission in order to protect the European Communities' financial interests against fraud and other
irregularities (OJ L 292, 15.11.1996, p. 2).
9 Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on the
financial rules applicable to the general budget of the Union and repealing Council Regulation (EC, Euratom) No
1605/2002 (OJ L 298, 26.10.2012, p. 1).
31
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
The Agency or the Commission may extend findings from other grants to this grant (‘extension of
findings from other grants to this grant’), if:
(a) the beneficiary concerned is found, in other EU or Euratom grants awarded under similar
conditions, to have committed systemic or recurrent errors, irregularities, fraud or breach of
obligations that have a material impact on this grant and
(b) those findings are formally notified to the beneficiary concerned — together with the list of
grants affected by the findings — no later than five years after the payment of the balance
of this grant.
The extension of findings may lead to the rejection of costs (see Article 26), reduction of the grant
(see Article 27), recovery of undue amounts (see Article 28), suspension of payments (see Article 32),
suspension of the action implementation (see Article 33) or termination (see Article 34).
17.5.3 Procedure
The Agency or the Commission will formally notify the beneficiary concerned the systemic or
recurrent errors and its intention to extend these audit findings, together with the list of grants affected.
17.5.3.1 If the findings concern eligibility of costs: the formal notification will include:
(a) an invitation to submit observations on the list of grants affected by the findings;
(b) the request to submit revised financial statements for all grants affected;
(c) the correction rate for extrapolation established by the Agency or the Commission on
the basis of the systemic or recurrent errors, to calculate the amounts to be rejected, if the
beneficiary concerned:
(i) considers that the submission of revised financial statements is not possible or practicable
or
(ii) does not submit revised financial statements.
The beneficiary concerned has 90 days from receiving notification to submit observations, revised
financial statements or to propose a duly substantiated alternative correction method. This period
may be extended by the Agency or the Commission in justified cases.
The Agency or the Commission may then start a rejection procedure in accordance with Article 26,
either on the basis of the revised financial statements, the alternative method or the correction rate
announced.
17.5.3.2 If the findings concern substantial errors, irregularities or fraud or serious breach of
obligations: the formal notification will include:
(a) an invitation to submit observations on the list of grants affected by the findings and
(b) the flat-rate the Agency or the Commission intends to apply according to the principle of
proportionality.
The beneficiary concerned has 90 days from receiving notification to submit observations or to
propose a duly substantiated alternative flat-rate.
32
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
The Agency or the Commission may then start a reduction procedure in accordance with Article 27,
either on the basis of the alternative flat-rate or the flat-rate announced.
17.6 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, any insufficiently substantiated costs
will be ineligible (see Article 6) and will be rejected (see Article 26).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 18 — EVALUATION OF THE IMPACT OF THE ACTION
18.1 Right to evaluate the impact of the action
The Agency or the Commission may carry out interim and final evaluations of the impact of the action
measured against the objective of the EU programme.
Evaluations may be started during implementation of the action and up to five years after the
payment of the balance. The evaluation is considered to start on the date of the formal notification
to the coordinator or beneficiaries.
The Agency or the Commission may make these evaluations directly (using its own staff) or indirectly
(using external bodies or persons it has authorised to do so).
The coordinator or beneficiaries must provide any information relevant to evaluate the impact of the
action, including information in electronic format.
18.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the Agency may apply the measures
described in Chapter 6.
SECTION 3 OTHER RIGHTS AND OBLIGATIONS
ARTICLE 19 — PRE-EXISTING RIGHTS AND OWNERSHIP OF THE RESULTS
(INCLUDING INTELLECTUAL AND INDUSTRIAL PROPERTY
RIGHTS)
19.1 Pre-existing rights and access rights to pre-existing rights
Where industrial and intellectual property rights (including rights of third parties) exist prior to the
Agreement, the beneficiaries must establish a list of these pre-existing industrial and intellectual
property rights, specifying the owner and any persons that have a right of use.
The coordinator must — before starting the action — submit this list to the Agency.
Each beneficiary must give the other beneficiaries and their affiliated entities access to any pre-existing
industrial and intellectual property rights needed for the implementation of the action and compliance
with the obligations under the Agreement.
33
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
19.2 Ownership of results and rights of use
The results of the action (including the reports and other documents relating to it) are owned by the
beneficiaries.
The beneficiaries must give the Agency and the Commission the right to use the results for their
communication activities under Article 22.
19.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
Such a breach may also lead to any of the other measures described in Chapter 6.
ARTICLE 20 — CONFLICT OF INTERESTS
20.1 Obligation to avoid a conflict of interests
The beneficiaries must take all measures to prevent any situation where the impartial and objective
implementation of the action is compromised for reasons involving economic interest, political or
national affinity, family or emotional ties or any other shared interest (‘conflict of interests’).
They must formally notify to the Agency without delay any situation constituting or likely to lead to
a conflict of interests and immediately take all the necessary steps to rectify this situation.
The Agency may verify that the measures taken are appropriate and may require additional measures
to be taken by a specified deadline.
20.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27) and the Agreement or participation of the beneficiary may be terminated (see Article 34).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 21 — CONFIDENTIALITY
21.1 General obligation to maintain confidentiality
During implementation of the action and for five years after the payment of the balance, the parties
must keep confidential any data, documents or other material (in any form) that is identified as
confidential at the time it is disclosed (‘confidential information’).
They may use confidential information to implement the Agreement.
The confidentiality obligations no longer apply if:
(a) the disclosing party agrees to release the other party;
(b) the information becomes generally and publicly available, without breaching any
confidentiality obligation;
34
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
(c) the disclosure of the confidential information is required by EU or national law.
21.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 22 — PROMOTING THE ACTION — VISIBILITY OF EU FUNDING
22.1 Communication activities by the beneficiaries
22.1.1 General obligation to promote the action and its results
The beneficiaries must promote the action and its results.
22.1.2 Information on EU funding — Obligation and right to use the EU emblem
Unless the Agency requests or agrees otherwise, any communication activity related to the action
(including at conferences, seminars, in information material, such as brochures, leaflets, posters,
presentations, etc., in electronic form, via social media, etc.) and any infrastructure, equipment or
major results funded by the grant must:
- display the EU emblem and
- include the following text:
“This [insert appropriate description, e.g. report, publication, conference, infrastructure, equipment, insert
type of result, etc.] was funded by the European Union’s Health Programme (2014-2020).”
When displayed in association with another logo, the EU emblem must have appropriate prominence.
For the purposes of their obligations under this Article, the beneficiaries may use the EU emblem
without first obtaining approval from the Agency.
This does not, however, give them the right to exclusive use.
Moreover, they may not appropriate the EU emblem or any similar trademark or logo, either by
registration or by any other means.
22.1.3 Disclaimer excluding Agency and Commission responsibility
Any communication activity related to the action must indicate the following disclaimer:
"The content of this [insert appropriate description, e.g. report, publication, conference, etc.] represents
the views of the author only and is his/her sole responsibility; it cannot be considered to reflect the views
of the European Commission and/or the Consumers, Health, Agriculture and Food Executive Agency
(CHAFEA) or any other body of the European Union. The European Commission and the Agency do not
accept any responsibility for use that may be made of the information it contains.”
22.2 Communication activities by the Agency and the Commission
22.2.1 Right to use the beneficiaries’ materials, documents or information
35
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
The Agency and the Commission may use information relating to the action, documents notably
summaries for publication and public deliverables as well as any other material, such as pictures or
audio-visual material received from any beneficiary (including in electronic form).
This does not change the confidentiality obligations in Article 21, which still apply.
The right to use the beneficiary’s materials, documents and information includes:
(a) use for its own purposes (in particular, making them available to persons working for the
Agency, the Commission or any other EU institution, body, office or agency or body or
institutions in EU Member States; and copying or reproducing them in whole or in part, in
unlimited numbers);
(b) distribution to the public (in particular, publication as hard copies and in electronic or digital
format, publication on the internet, as a downloadable or non-downloadable file, broadcasting
by any channel, public display or presentation, communicating through press information
services, or inclusion in widely accessible databases or indexes);
(c) editing or redrafting for communication and publicising activities (including shortening,
summarising, inserting other elements (such as meta-data, legends, other graphic, visual, audio
or text elements), extracting parts (e.g. audio or video files), dividing into parts, use in a
compilation);
(d) translation;
(e) giving access in response to individual requests under Regulation No 1049/200110, without
the right to reproduce or exploit;
(f) storage in paper, electronic or other form;
(g) archiving, in line with applicable document-management rules, and
(h) the right to authorise third parties to act on its behalf or sub-license the modes of use set out
in Points (b), (c), (d) and (f) to third parties if needed for the communication and publicising
activities of the Agency or the Commission.
If the right of use is subject to rights of a third party (including personnel of the beneficiary), the
beneficiary must ensure that it complies with its obligations under this Agreement (in particular, by
obtaining the necessary approval from the third parties concerned).
Where applicable (and if provided by the beneficiaries), the Agency or the Commission will insert
the following information:
“© – [year] – [name of the copyright owner]. All rights reserved. Licensed to the Consumers, Health,
Agriculture and Food Executive Agency (CHAFEA) and the European Union (EU) under conditions.”
22.3 Consequences of non-compliance
If the beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
10 Regulation (EC) No 1049/2001 of the European Parliament and of the Council of 30 May 2001 regarding public access
to European Parliament, Council and Commission documents, OJ L 145, 31.5.2001, p. 43.
36
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 23 — PROCESSING OF PERSONAL DATA
23.1 Processing of personal data by the Agency and the Commission
Any personal data under the Agreement will be processed by the Agency or the Commission under
Regulation No 23/200111 and according to the ‘notifications of the processing operations’ to the Data
Protection Officer (DPO) of the Agency or the Commission (publicly accessible in the DPO register).
Such data will be processed by the ‘data controller’ of the Agency or the Commission, for the
purposes of implementing, managing and monitoring the Agreement or protecting the financial
interests of the EU or Euratom (including checks, reviews, audits and investigations; see Article 17).
The persons whose personal data are processed have the right to access and correct their own personal
data. For this purpose, they must send any queries about the processing of their personal data to the data
controller, via the contact point indicated in the privacy statement(s) on the Agency and Commission
websites.
They also have the right to have recourse at any time to the European Data Protection Supervisor
(EDPS).
23.2 Processing of personal data by the beneficiaries
The beneficiaries must process personal data under the Agreement in compliance with applicable EU
and national law on data protection (including authorisations or notification requirements).
The beneficiaries may grant their personnel access only to data that is strictly necessary for
implementing, managing and monitoring the Agreement.
The beneficiaries must inform the personnel whose personal data are collected and processed by the
Agency or the Commission. For this purpose, they must provide them with the privacy statement(s)
(see above), before transmitting their data to the Agency or the Commission.
23.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under Article 23.2, the Agency may apply any of the
measures described in Chapter 6.
ARTICLE 24 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE AGENCY
The beneficiaries may not assign any of their claims for payment against the Agency to any third
party, except if approved by the Agency on the basis of a reasoned, written request by the coordinator
(on behalf of the beneficiary concerned).
If the Agency has not accepted the assignment or the terms of it are not observed, the assignment
will have no effect on it.
11 Regulation (EC) No 45/2001 of the European Parliament and of the Council of 18 December 2000 on the protection
of individuals with regard to the processing of personal data by the Community institutions and bodies and on the free
movement of such data (OJ L 8, 12.01.2001, p. 1).
37
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
In no circumstances will an assignment release the beneficiaries from their obligations towards the
Agency.
CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES
ARTICLE 25 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES
25.1 Roles and responsibilities towards the Agency
The beneficiaries have full responsibility for implementing the action and complying with the
Agreement.
The beneficiaries are jointly and severally liable for the technical implementation of the action as
described in Annex 1. If a beneficiary fails to implement its part of the action, the other beneficiaries
become responsible for implementing this part (without being entitled to any additional EU funding
for doing so), unless the Agency expressly relieves them of this obligation.
The financial responsibility of each beneficiary is governed by Articles 28, 29 and 30.
25.2 Internal division of roles and responsibilities
The internal roles and responsibilities of the beneficiaries are divided as follows:
(a) Each beneficiary must:
(i) keep information stored in the Participant Portal Beneficiary Register (via the electronic
exchange system) up to date (see Article 12);
(ii) inform the coordinator immediately of any events or circumstances likely to affect
significantly or delay the implementation of the action (see Article 12);
(iii) submit to the coordinator in good time:
- individual financial statements for itself and its affiliated entities and, if required,
certificates on the financial statements (see Article 15);
- the data needed to draw up the technical reports (see Article 15);
- any other documents or information required by the Agency or the Commission
under the Agreement, unless the Agreement requires the beneficiary to submit this
information directly.
(b) The coordinator must:
(i) monitor that the action is implemented properly (see Article 7);
(ii) act as the intermediary for all communications between the beneficiaries and the Agency
(in particular, providing the Agency with the information described in Article 12), unless
the Agreement specifies otherwise;
(iii) provide a pre-financing guarantee if requested by the Agency (see Article 16.2);
38
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
(iv) request and review any documents or information required by the Agency and verify
their completeness and correctness before passing them on to the Agency;
(v) submit the deliverables and reports to the Agency (see Articles 14 and 15);
(vi) ensure that all payments are made to the other beneficiaries without unjustified delay
(see Article 16).
The coordinator may not subcontract the above-mentioned tasks.
25.3 Internal arrangements between beneficiaries — Consortium agreement
The beneficiaries must have internal arrangements regarding their operation and co-ordination to
ensure that the action is implemented properly. These internal arrangements must be set out in a written
‘consortium agreement’ between the beneficiaries, which may cover:
- internal organisation of the consortium;
- management of access to the electronic exchange system;
- distribution of EU funding;
- additional rules on rights and obligations related to pre-existing rights and results (see
Article 19);
- settlement of internal disputes;
- liability, indemnification and confidentiality arrangements between the beneficiaries.
The consortium agreement must not contain any provision contrary to the Agreement.
CHAPTER 6 REJECTION OF COSTS — REDUCTION OF THE GRANT —
RECOVERY — SANCTIONS — DAMAGES — SUSPENSION —
TERMINATION — FORCE MAJEURE
SECTION 1 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY
— SANCTIONS
ARTICLE 26 — REJECTION OF INELIGIBLE COSTS
26.1 Conditions
The Agency will — at the time of an interim payment, at the payment of the balance or afterwards
— reject any costs which are ineligible (see Article 6), in particular following checks, reviews, audits
or investigations (see Article 17).
The rejection may also be based on the extension of findings from other grants to this grant (see
Article 17.5.2).
39
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
26.2 Ineligible costs to be rejected — Calculation — Procedure
Ineligible costs will be rejected in full.
If the rejection of costs does not lead to a recovery (see Article 28), the Agency will formally notify
the coordinator or beneficiary concerned of the rejection of costs, the amounts and the reasons why
(if applicable, together with the notification of amounts due; see Article 16.5). The coordinator or
beneficiary concerned may — within 30 days of receiving notification — formally notify the Agency
of its disagreement and the reasons why.
If the rejection of costs leads to a recovery, the Agency will follow the contradictory procedure with
pre-information letter set out in Article 28.
26.3 Effects
If the Agency rejects costs at the time of an interim payment or the payment of the balance, it will
deduct them from the total eligible costs declared, for the action, in the periodic or final summary
financial statement (see Article 15.3 and 15.4). It will then calculate the interim payment or payment
of the balance as set out in Article 16.3 or 16.4.
If the Agency — after an interim payment but before the payment of the balance — rejects costs
declared in a periodic summary financial statement, it will deduct them from the costs declared in the
next periodic summary financial statement or final summary financial statement. It will then calculate
the interim payment or payment of the balance as set out in Article 16.3 or 16.4.
If the Agency rejects costs after the payment of the balance, it will deduct the amount rejected from
the total eligible costs declared, by the beneficiary, in the final summary financial statement. It will
then calculate the revised final grant amount as set out in Article 5.4. If the revised final grant amount
is lower than the final grant amount, the Agency will recover the difference (see Article 28).
ARTICLE 27 — REDUCTION OF THE GRANT
27.1 Conditions
The Agency may — at the payment of the balance or afterwards — reduce the grant, if:
(a) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under the Agreement or during the award procedure
(including improper implementation of the action, submission of false information,
failure to provide required information, breach of ethical principles) or
(b) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed — in other EU or Euratom grants awarded to it under similar conditions —
systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a
material impact on this grant (extension of findings from other grants to this grant; see
Article 17.5.2).
40
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
27.2 Amount to be reduced — Calculation — Procedure
The amount of the reduction will be proportionate to the seriousness of the errors, irregularities or
fraud or breach of obligations.
Before reduction of the grant, the Agency will formally notify a ‘pre-information letter’ to the
coordinator or beneficiary concerned:
- informing it of its intention to reduce the grant, the amount it intends to reduce and the reasons
why and
- inviting it to submit observations within 30 days of receiving notification.
If the Agency does not receive any observations or decides to pursue reduction despite the observations
it has received, it will formally notify confirmation of the reduction (if applicable, together with the
notification of amounts due; see Article 16).
27.3 Effects
If the Agency reduces the grant at the time of the payment of the balance, it will calculate the
reduced grant amount for the action and then determine the amount due as payment of the balance
(see Article 5.3.4 and 16.4).
If the Agency reduces the grant after the payment of the balance, it will calculate the revised final
grant amount for the action or for the beneficiary concerned (see Article 5.4). If the revised final grant
amount is lower than the final grant amount, the Agency will recover the difference (see Article 28).
ARTICLE 28 — RECOVERY OF UNDUE AMOUNTS
28.1 Amount to be recovered — Calculation — Procedure
The Agency will — at the payment of the balance or afterwards — claim back any amount that
was paid but is not due under the Agreement.
The coordinator is fully liable for repaying debts of the consortium (under the Agreement) even if it
has not been the final recipient of those amounts.
In addition, the beneficiaries (including the coordinator) are jointly and severally liable for repaying
any unpaid debts under the Agreement (due by the consortium or any beneficiary, including late-
payment interest) — up to the maximum EU contribution indicated, for each beneficiary, in the
estimated budget (as last amended; see Annex 2).
Undue amounts paid by the Agency for costs declared by an affiliated entity will be considered as
amounts unduly paid to the beneficiary.
28.1.1 Recovery at payment of the balance
If the payment of the balance takes the form of a recovery (see Article 16.4), the Agency will formally
notify a ‘pre-information letter’ to the coordinator:
- informing it of its intention to recover, the amount due as the balance and the reasons why and
41
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
- inviting the coordinator to submit observations within 30 days of receiving notification.
If no observations are submitted or the Agency decides to pursue recovery despite the observations
it has received, it will confirm the amount to be recovered and formally notify to the coordinator a
debit note with the terms and the date for payment (together with the notification of amounts due;
see Article 16.5).
If payment is not made by the date specified in the debit note, the Agency or the Commission will
recover the amount:
(a) by ‘offsetting’ it — without the coordinator’s consent — against any amounts owed to the
coordinator by the Agency, Commission or another executive agency (from the EU or Euratom
budget).
In exceptional circumstances, to safeguard the EU’s financial interests, the Agency may offset
before the payment date specified in the debit note;
(b) not applicable;
(c) by holding the other beneficiaries jointly and severally liable — up to the maximum EU
contribution indicated, for each beneficiary, in the estimated budget (as last amended; see
Annex 2)
(d) by taking legal action (see Article 41) or by adopting an enforceable decision under
Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the
Financial Regulation No 966/2012.
If payment is not made by the date in the debit note, the amount to be recovered (see above) will be
increased by late-payment interest at the rate set out in Article 16.11, from the day following the
payment date in the debit note, up to and including the date the Agency or the Commission receives
full payment of the amount.
Partial payments will be first credited against expenses, charges and late-payment interest and then
against the principal.
Bank charges incurred in the recovery process will be borne by the beneficiary, unless Directive
2007/64/EC applies.
28.1.2 Recovery of amounts after payment of the balance
If — after the payment of the balance — the Agency revised the final grant amount for the action or
for the beneficiary concerned (see Article 5.4), due to a rejection of costs or reduction of the grant, and
the revised final grant amount is lower than the final grant amount (see Article 5.3), the Agency will:
- if the rejection or reduction does not concern a specific beneficiary or its affiliated entities:
claim back the difference from the coordinator (even if it has not been the final recipient of
the amount in question)
or
- otherwise: claim back the difference from the beneficiary concerned.
The Agency will formally notify a pre-information letter to the coordinator or beneficiary concerned:
42
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
- informing it of its intention to recover, the amount to be repaid and the reasons why and
- inviting it to submit observations within 30 days of receiving notification.
If no observations are submitted or the Agency decides to pursue recovery despite the observations
it has received, it will confirm the amount to be recovered and formally notify to the coordinator or
beneficiary concerned a debit note. This note will also specify the terms and the date for payment.
If payment is not made by the date specified in the debit note, the Agency or the Commission will
recover the amount:
(a) by ‘offsetting’ it — without the coordinator’s or beneficiary’s consent — against any amounts
owed to the coordinator or beneficiary by the Agency, Commission or another executive agency
(from the EU or Euratom budget).
In exceptional circumstances, to safeguard the EU’s financial interests, the Agency may offset
before the payment date specified in the debit note;
(b) by holding the other beneficiaries jointly and severally liable, up to the maximum EU
contribution indicated, for each beneficiary, in the estimated budget (as last amended; see
Annex 2)
(c) by taking legal action (see Article 41) or by adopting an enforceable decision under
Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the
Financial Regulation No 966/2012.
If payment is not made by the date in the debit note, the amount to be recovered (see above) will be
increased by late-payment interest at the rate set out in Article 16.11, from the day following the date
for payment in the debit note, up to and including the date the Agency or the Commission receives
full payment of the amount.
Partial payments will be first credited against expenses, charges and late-payment interest and then
against the principal.
Bank charges incurred in the recovery process will be borne by the beneficiary, unless Directive
2007/64/EC applies.
ARTICLE 29 — ADMINISTRATIVE SANCTIONS
In addition to contractual measures, the Agency or the Commission may also adopt administrative
sanctions under Articles 106 and 131(4) of the Financial Regulation No 966/2012 (i.e. exclusion from
future procurement contracts, grants and expert contracts and/or financial penalties).
SECTION 2 LIABILITY FOR DAMAGES
ARTICLE 30 — LIABILITY FOR DAMAGES
30.1 Liability of the Agency
The Agency cannot be held liable for any damage caused to the beneficiaries or to third parties as a
consequence of implementing the Agreement, including for gross negligence.
43
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
The Agency cannot be held liable for any damage caused by any of the beneficiaries or third parties
involved in the action, as a consequence of implementing the Agreement.
30.2 Liability of the beneficiaries
Except in case of force majeure (see Article 35), the beneficiaries must compensate the Agency for
any damage it sustains as a result of the implementation of the action or because the action was not
implemented in full compliance with the Agreement.
SECTION 3 SUSPENSION AND TERMINATION
ARTICLE 31 — SUSPENSION OF PAYMENT DEADLINE
31.1 Conditions
The Agency may — at any moment — suspend the payment deadline (see Article 16.2 to 16.4) if a
request for payment (see Article 15) cannot be approved because:
(a) it does not comply with the provisions of the Agreement (see Article 15);
(b) the technical or financial report(s) have not been submitted or are not complete or additional
information is needed, or
(c) there is doubt about the eligibility of the costs declared in the financial statements and additional
checks, reviews, audits or investigations are necessary.
31.2 Procedure
The Agency will formally notify the coordinator of the suspension and the reasons why.
The suspension will take effect the day notification is sent by the Agency (see Article 36).
If the conditions for suspending the payment deadline are no longer met, the suspension will be lifted
— and the remaining period will resume.
If the suspension exceeds two months, the coordinator may request the Agency if the suspension will
continue.
If the payment deadline has been suspended due to the non-compliance of the technical or financial
report(s) (see Article 15) and the revised report or statement is not submitted or was submitted but
is also rejected, the Agency may also terminate the Agreement or the participation of the beneficiary
(see Article 34.3.1(i)).
ARTICLE 32 — SUSPENSION OF PAYMENTS
32.1 Conditions
The Agency may — at any moment — suspend payments, in whole or in part for one or more
beneficiaries, if:
44
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
(a) a beneficiary (or a natural person who has the power to represent or take decision on its behalf)
has committed or is suspected of having committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during the award procedure
(including improper implementation of the action, submission of false information,
failure to provide required information, breach of ethical principles) or
(b) a beneficiary (or a natural person who has the power to represent or take decision on its behalf)
has committed — in other EU or Euratom grants awarded to it under similar conditions —
systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a
material impact on this grant (extension of findings from other grants to this grant; see
Article 17.5.2).
If payments are suspended for one or more beneficiaries, the Agency will make partial payment(s)
for the part(s) not suspended. If suspension concerns the payment of the balance, the payment (or
recovery) of the amount(s) concerned after suspension is lifted will be considered to be the payment
that closes the action.
32.2 Procedure
Before suspending payments, the Agency will formally notify the coordinator or beneficiary
concerned:
- informing it of its intention to suspend payments and the reasons why and
- inviting it to submit observations within 30 days of receiving notification.
If the Agency does not receive observations or decides to pursue the procedure despite the observations
it has received, it will formally notify confirmation of the suspension. Otherwise, it will formally
notify that the suspension procedure is not continued.
The suspension will take effect the day the confirmation notification is sent by the Agency.
If the conditions for resuming payments are met, the suspension will be lifted. The Agency will
formally notify the coordinator or beneficiary concerned.
During the suspension, the periodic report(s) for all reporting periods except the last one (see
Article 15.3) must not contain any individual financial statement(s) from the beneficiary concerned
and its affiliated entities. The coordinator must include them in the next periodic report after the
suspension is lifted or — if suspension is not lifted before the end of the action — in the last periodic
report.
The beneficiaries may suspend implementation of the action (see Article 33.1) or terminate the
Agreement or the participation of the beneficiary concerned (see Article 34.1 and 34.2).
ARTICLE 33 — SUSPENSION OF THE ACTION IMPLEMENTATION
33.1 Suspension of the action implementation, by the beneficiaries
33.1.1 Conditions
45
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
The beneficiaries may suspend implementation of the action or any part of it, if exceptional
circumstances — in particular force majeure (see Article 35) — make implementation impossible or
excessively difficult.
33.1.2 Procedure
The coordinator must immediately formally notify to the Agency the suspension (see Article 36),
stating:
- the reasons why and
- the expected date of resumption.
The suspension will take effect the day this notification is received by the Agency.
Once circumstances allow for implementation to resume, the coordinator must immediately formally
notify the Agency and request an amendment of the Agreement, to set the date on which the action
will be resumed, extend the duration of the action and make other changes necessary to adapt the action
to the new situation (see Article 39) — unless the Agreement or the participation of a beneficiary has
been terminated (see Article 34).
The suspension will be lifted with effect from the resumption date set out in the amendment. This
date may be before the date on which the amendment enters into force.
Costs incurred during suspension of the action implementation are not eligible (see Article 6).
33.2 Suspension of the action implementation, by the Agency
33.2.1 Conditions
The Agency may suspend implementation of the action or any part of it, if:
(a) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed or is suspected of having committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during the award procedure
(including improper implementation of the action, submission of false declaration, failure
to provide required information, breach of ethical principles) or
(b) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed — in other EU or Euratom grants awarded to it under similar conditions —
systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a
material impact on this grant (extension of findings from other grants to this grant; see
Article 17.5.2).
33.2.2 Procedure
Before suspending implementation of the action, the Agency will formally notify the coordinator or
beneficiary concerned:
- informing it of its intention to suspend the implementation and the reasons why and
46
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
- inviting it to submit observations within 30 days of receiving notification.
If the Agency does not receive observations or decides to pursue the procedure despite the observations
it has received, it will formally notify confirmation of the suspension. Otherwise, it will formally
notify that the procedure is not continued.
The suspension will take effect five days after confirmation notification is received (or on a later date
specified in the notification).
It will be lifted if the conditions for resuming implementation of the action are met.
The coordinator or beneficiary concerned will be formally notified of the lifting and the Agreement
will be amended, to set the date on which the action will be resumed, extend the duration of the action
and make other changes necessary to adapt the action to the new situation (see Article 39) — unless
the Agreement has already been terminated (see Article 34).
The suspension will be lifted with effect from the resumption date set out in the amendment. This date
may be before the date on which the amendment enters into force.
Costs incurred during suspension are not eligible (see Article 6).
The beneficiaries may not claim damages due to suspension by the Agency (see Article 30).
Suspension of the action implementation does not affect the Agency’s right to terminate the Agreement
or participation of a beneficiary (see Article 34), reduce the grant or recover amounts unduly paid
(see Articles 27 and 28).
ARTICLE 34 — TERMINATION OF THE AGREEMENT OR OF THE PARTICIPATION
OF ONE OR MORE BENEFICIARIES
34.1 Termination of the Agreement, by the beneficiaries
34.1.1 Conditions and procedure
The beneficiaries may terminate the Agreement.
The coordinator must formally notify termination to the Agency (see Article 36), stating:
- the reasons why and
- the date the termination will take effect. This date must be after the notification.
If no reasons are given or if the Agency considers the reasons do not justify termination, the Agreement
will be considered to have been ‘terminated improperly’.
The termination will take effect on the day specified in the notification.
34.1.2 Effects
The coordinator must — within 60 days from when termination takes effect — submit a periodic report
(for the open reporting period until termination; see Article 15.3) and the final report (see Article 15.4).
47
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
If the Agency does not receive the report(s) within the deadline (see above), only costs which are
included in an approved periodic report will be taken into account.
The Agency will calculate the final grant amount (see Article 5.3) and the balance (see Article 16.4)
on the basis of the report(s) submitted. Only costs incurred until termination are eligible (see Article 6).
Costs relating to contracts due for execution only after termination are not eligible.
Improper termination may lead to a reduction of the grant (see Article 27).
After termination, the beneficiaries’ obligations (in particular, Articles 15, 17, 18, 19, 20, 21, 22, 24,
26, 27 and 28) continue to apply.
34.2 Termination of the participation of one or more beneficiaries, by the beneficiaries
34.2.1 Conditions and procedure
The participation of one or more beneficiaries may be terminated by the coordinator, on request of
the beneficiary concerned or on behalf of the other beneficiaries.
The coordinator must formally notify termination to the Agency (see Article 36) and inform the
beneficiary concerned.
If the coordinator’s participation is terminated without its agreement, the formal notification must be
done by another beneficiary (acting on behalf of the other beneficiaries).
The notification must include:
- the reasons why;
- the opinion of the beneficiary concerned (or proof that this opinion has been requested in
writing);
- the date the termination takes effect. This date must be after the notification, and
- a request for amendment (see Article 39), with a proposal for reallocation of the tasks and the
estimated budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the
addition of one or more new beneficiaries (see Article 40). If termination takes effect after the
period set out in Article 3, no request for amendment must be included, unless the beneficiary
concerned is the coordinator. In this case, the request for amendment must propose a new
coordinator.
If this information is not given or if the Agency considers that the reasons do not justify termination,
the participation will be considered to have been terminated improperly.
The termination will take effect on the day specified in the notification.
34.2.2 Effects
The beneficiary concerned must submit to the coordinator:
(i) a technical report and
48
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
(ii) a financial statement covering the period from the end of the last reporting period to the date
when termination takes effect.
This information must be included by the coordinator in the periodic report for the next reporting
period (see Article 15.3).
If the request for amendment is rejected by the Agency (because it calls into question the decision
awarding the grant or breaches the principle of equal treatment of applicants), the Agreement may be
terminated according to Article 34.3.1(c).
If the request for amendment is accepted by the Agency, the Agreement is amended to introduce the
necessary changes (see Article 39).
Improper termination may lead to a reduction of the grant (see Article 27) or termination of the
Agreement (see Article 34).
After termination, the concerned beneficiary’s obligations (in particular Articles 15, 17, 18, 19, 21,
22, 24, 26, 27 and 28) continue to apply.
34.3 Termination of the Agreement or of the participation of one or more beneficiaries, by
the Agency
34.3.1 Conditions
The Agency may terminate the Agreement or the participation of one or more beneficiaries, if:
(a) one or more beneficiaries do not accede to the Agreement (see Article 40);
(b) a change to their legal, financial, technical, organisational or ownership situation (or those of
its affiliated entities) is likely to substantially affect or delay the implementation of the action
or calls into question the decision to award the grant;
(c) following termination of participation for one or more beneficiaries (see above), the necessary
changes to the Agreement would call into question the decision awarding the grant or breach
the principle of equal treatment of applicants (see Article 39);
(d) implementation of the action is prevented by force majeure (see Article 35) or suspended by
the coordinator (see Article 33.1) and either:
(i) resumption is impossible, or
(ii) the necessary changes to the Agreement would call into question the decision awarding
the grant or breach the principle of equal treatment of applicants;
(e) a beneficiary is declared bankrupt, being wound up, having its affairs administered by the
courts, has entered into an arrangement with creditors, has suspended business activities, or
is subject to any other similar proceedings or procedures under national law;
(f) a beneficiary (or a natural person who has the power to represent or take decisions on its
behalf) has been found guilty of professional misconduct, proven by any means;
(g) a beneficiary does not comply with the applicable national law on taxes and social security;
49
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
(h) a beneficiary (or a natural person who has the power to represent or take decisions on its
behalf) has committed fraud, corruption, or is involved in a criminal organisation, money
laundering or any other illegal activity;
(i) a beneficiary (or a natural person who has the power to represent or take decisions on its
behalf) has committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under the Agreement or during the award procedure
(including improper implementation of the action, submission of false information,
failure to provide required information, breach of ethical principles);
(j) a beneficiary (or a natural person who has the power to represent or take decisions on its
behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions
— systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have
a material impact on this grant (extension of findings from other grants to this grant; see
Article 17.5.2);
(k) despite a specific request by the Agency, a beneficiary does not request — through the
coordinator — an amendment to the Agreement to end the participation of one of its affiliated
entities that is in one of the situations under points (e), (f), (g), (h), (i) or (j) and to reallocate
its tasks
34.3.2 Procedure
Before terminating the Agreement or participation of one or more beneficiaries, the Agency will
formally notify the coordinator or beneficiary concerned:
- informing it of its intention to terminate and the reasons why and
- inviting it, within 30 days of receiving notification, to submit observations and — in case of
Point (i.ii) above — to inform the Agency of the measures to ensure compliance with the
obligations under the Agreement.
If the Agency does not receive observations or decides to pursue the procedure despite the observations
it has received, it will formally notify to the coordinator or beneficiary concerned confirmation of
the termination and the date it will take effect. Otherwise, it will formally notify that the procedure
is not continued.
The termination will take effect:
- for terminations under Points (b), (c), (e), (g), (i.ii) and (k) above: on the day specified in the
notification of the confirmation (see above);
- for terminations under Points (a), (d), (f), (h), (i.i) and (j) above: on the day after the notification
of the confirmation is received.
34.3.3 Effects
(a) for termination of the Agreement:
The coordinator must — within 60 days from when termination takes effect — submit a periodic
50
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
report (for the last open reporting period until termination; see Article 15.3) and a final report
(see Article 15.4).
If the Agreement is terminated for breach of the obligation to submit reports (see Articles 15.8
and 34.3.1(i)), the coordinator may not submit any reports after termination.
If the Agency does not receive the report(s) within the deadline (see above), only costs which
are included in an approved periodic report will be taken into account.
The Agency will calculate the final grant amount (see Article 5.3) and the balance (see
Article 16.4) on the basis of the report(s) submitted. Only costs incurred until termination
takes effect are eligible (see Article 6). Costs relating to contracts due for execution only after
termination are not eligible.
This does not affect the Agency’s right to reduce the grant (see Article 27) or to impose
administrative sanctions (Article 29).
The beneficiaries may not claim damages due to termination by the Agency (see Article 30).
After termination, the beneficiaries’ obligations (in particular Articles 15, 17, 18, 19, 21, 22,
24, 26, 27 and 28) continue to apply.
(b) for termination of the participation of one or more beneficiaries:
The coordinator must — within 60 days from when termination takes effect — submit a request
for amendment (see Article 39), with a proposal for reallocation of the tasks and estimated
budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the addition of
one or more new beneficiaries (see Article 40). If termination is notified after the period set out
in Article 3, no request for amendment must be submitted unless the beneficiary concerned is
the coordinator. In this case the request for amendment must propose a new coordinator.
The beneficiary concerned must submit to the coordinator:
(i) a technical report and
(ii) a financial statement covering the period from the end of the last reporting period to the
date when termination takes effect.
This information must be included by the coordinator in periodic report for the next reporting
period (see Article 15.3).
If the request for amendment is rejected by the Agency (because it calls into question the
decision awarding the grant or breaches the principle of equal treatment of applicants), the
Agreement may be terminated according to Article 34.3.1(c).
If the request for amendment is accepted by the Agency, the Agreement is amended to
introduce the necessary changes (see Article 39).
After termination, the concerned beneficiary’s obligations (in particular Articles 15, 17, 18, 19,
20, 21, 22, 24, 26, 27 and 28) continue to apply.
SECTION 4 FORCE MAJEURE
51
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
ARTICLE 35 — FORCE MAJEURE
‘Force majeure’ means any situation or event that:
- prevents either party from fulfilling their obligations under the Agreement,
- was unforeseeable, exceptional situation and beyond the parties’ control,
- was not due to error or negligence on their part (or on the part of third parties involved in the
action), and
- proves to be inevitable in spite of exercising all due diligence.
The following cannot be invoked as force majeure:
- any default of a service, defect in equipment or material or delays in making them available,
unless they stem directly from a relevant case of force majeure,
- labour disputes or strikes, or
- financial difficulties.
Any situation constituting force majeure must be formally notified to the other party without delay,
stating the nature, likely duration and foreseeable effects.
The parties must immediately take all the necessary steps to limit any damage due to force majeure
and do their best to resume implementation of the action as soon as possible.
The party prevented by force majeure from fulfilling its obligations under the Agreement cannot be
considered in breach of them.
CHAPTER 7 FINAL PROVISIONS
ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES
36.1 Form and means of communication
Communication under the Agreement (information, requests, submissions, 'formal notifications', etc.)
must:
- be made in writing and
- bear the number of the Agreement.
Until the payment of the balance: all communication must be made through the electronic exchange
system and using the forms and templates provided there.
After the payment of the balance: formal notifications must be made by registered post with proof
of delivery (‘formal notification on paper’).
Communications in the electronic exchange system must be made by persons authorised according to
the Participant Portal Terms & Conditions. For naming the authorised persons, each beneficiary must
52
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
have designated — before the signature of this Agreement — a ‘legal entity appointed representative
(LEAR)’. The role and tasks of the LEAR are stipulated in his/her appointment letter (see Participant
Portal Terms & Conditions).
If the electronic exchange system is temporarily unavailable, instructions will be given on the Agency
and Commission websites.
36.2 Date of communication
Communications are considered to have been made when they are sent by the sending party (i.e. on
the date and time they are sent through the electronic exchange system).
Formal notifications through the electronic exchange system are considered to have been made when
they are received by the receiving party (i.e. on the date and time of acceptance by the receiving party,
as indicated by the time stamp). A formal notification that has not been accepted within 10 days after
sending is considered to have been accepted.
Formal notifications on paper sent by registered post with proof of delivery (only after the payment
of the balance) are considered to have been made on either:
- the delivery date registered by the postal service or
- the deadline for collection at the post office.
If the electronic exchange system is temporarily unavailable, the sending party cannot be considered
in breach of its obligation to send a communication within a specified deadline.
36.3 Addresses for communication
The electronic exchange system must be accessed via the following URL:
https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/myarea/projects
The Agency will formally notify the coordinator and beneficiaries in advance any changes to this URL.
Formal notifications on paper (only after the payment of the balance) addressed to the Agency must
be sent to the following address:
European Health and Digital Executive Agency (HADEA)
Health and Food EU4Health/SMP Food
B-1049 Belgium
Formal notifications on paper (only after the payment of the balance) addressed to the beneficiaries
must be sent to their legal address as specified in the Participant Portal Beneficiary Register.
ARTICLE 37 — INTERPRETATION OF THE AGREEMENT
37.1 Precedence of the Terms and Conditions over the Annexes
The provisions in the Terms and Conditions of the Agreement take precedence over its Annexes.
Annex 2 takes precedence over Annex 1.
53
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
37.2 Privileges and immunities
Not applicable
ARTICLE 38 — CALCULATION OF PERIODS, DATES AND DEADLINES
In accordance with Regulation No 1182/7112, periods expressed in days, months or years are calculated
from the moment the triggering event occurs.
The day during which that event occurs is not considered as falling within the period.
ARTICLE 39 — AMENDMENTS TO THE AGREEMENT
39.1 Conditions
The Agreement may be amended, unless the amendment entails changes to the Agreement which
would call into question the decision awarding the grant or breach the principle of equal treatment
of applicants.
Amendments may be requested by any of the parties.
39.2 Procedure
The party requesting an amendment must submit a request for amendment signed in the electronic
exchange system (see Article 36).
The coordinator submits and receives requests for amendment on behalf of the beneficiaries (see
Annex 3).
If a change of coordinator is requested without its agreement, the submission must be done by another
beneficiary (acting on behalf of the other beneficiaries).
The request for amendment must include:
- the reasons why;
- the appropriate supporting documents, and
- for a change of coordinator without its agreement: the opinion of the coordinator (or proof that
this opinion has been requested in writing).
The Agency may request additional information.
If the party receiving the request agrees, it must sign the amendment in the electronic exchange system
within 45 days of receiving notification (or any additional information the Agency has requested). If
it does not agree, it must formally notify its disagreement within the same deadline. The deadline may
be extended, if necessary for the assessment of the request. If no notification is received within the
deadline, the request is considered to have been rejected.
12 Regulation (EEC, Euratom) No 1182/71 of the Council of 3 June 1971 determining the rules applicable to periods, dates
and time-limits (OJ L 124, 8/6/1971, p. 1).
54
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
An amendment enters into force on the day of the signature of the receiving party.
An amendment takes effect on the date agreed by the parties or, in the absence of such an agreement,
on the date on which the amendment enters into force.
ARTICLE 40 — ACCESSION TO THE AGREEMENT
40.1 Accession of the beneficiaries mentioned in the preamble
The other beneficiaries must accede to the Agreement by signing the Accession Form (see Annex 3) in
the electronic exchange system (see Article 36) within 30 days after its entry into force (see Article 42).
They will assume the rights and obligations under the Agreement with effect from the date of its entry
into force (see Article 42).
If a beneficiary does not accede to the Agreement within the above deadline, the coordinator must
— within 30 days — request an amendment to make any changes necessary to ensure proper
implementation of the action. This does not affect the Agency's right to terminate the Agreement (see
Article 34).
40.2 Addition of new beneficiaries
In justified cases, the beneficiaries may request the addition of a new beneficiary.
For this purpose, the coordinator must submit a request for amendment in accordance with Article 39.
It must include an Accession Form (see Annex 3) signed by the new beneficiary in the electronic
exchange system (see Article 36).
New beneficiaries must assume the rights and obligations under the Agreement with effect from the
date of their accession specified in the Accession Form (see Annex 3).
ARTICLE 41 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES
41.1 Applicable law
The Agreement is governed by the applicable EU law, supplemented if necessary by the law of
Belgium.
41.2 Dispute settlement
If a dispute concerning the interpretation, application or validity of the Agreement cannot be settled
amicably, the General Court — or, on appeal, the Court of Justice of the European Union — has sole
jurisdiction. Such actions must be brought under Article 272 of the Treaty on the Functioning of the
EU (TFEU).
As an exception, if such a dispute is between the Agency and ‘AGENTIA DE TRANSPLANT’, ‘THE
NORWEGIAN MINISTRY OF HEALTH AND CARE SERVICES’, ‘INSTITUT ZA ZASTITU
ZDRAVLJA SRBIJEDR MILAN JOVANOVIC BATUT’, the competent Belgian courts have sole
jurisdiction.
If a dispute concerns administrative sanctions, offsetting or an enforceable decision under
55
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2021)4548885 13/07/2021
Article 79(2) of the Financial Regulation No 966/2012 and Article 299 TFEU (see Articles 28, 29 and
30), the beneficiaries must bring action before the General Court — or, on appeal, the Court of Justice
of the European Union — under Article 263 TFEU. Actions against enforceable decisions must be
brought against the Commission (not against the Agency).
ARTICLE 42 — ENTRY INTO FORCE OF THE AGREEMENT
The Agreement will enter into force on the day of signature by the Agency or the coordinator,
depending on which is later.
SIGNATURES
For the coordinator For the Agency
[--TGSMark#signature-906912365_75_210--] [--TGSMark#signature-service_75_210--]
Heidi Saario with ECAS id n00430l4 signed in the Participant Signed by Nicolas KRIEGER with ECAS id kriegni as an authorised
Portal on 14/07/2021 at 08:59:24 (transaction id SigId-65545-TfkfZ representative on 15-07-2021 18:30:55 (transaction id SigId-85875-8
FJROLRcwE7r7xjNiRcSeXwSntzMlpkzaXKlvppuWZxWTZqOaDsIDth rIN7OVPwf5avzwrMp9r65U5MQE6Hzlt3JutzMkGGYXM8IwFIQnxvfnU
nn7rJYzt2pi5TzXNRwVkjnP6laoa-yntOf97TTHqL2QVETsEsmO-VwP P58xxGFzxdoKxgtHNHOazfdJKvtdg5zm-yntOf97TTHqL2QVETsEsmO-
e3BiWtLBEMd4MtiLqEzZFZ87zjSItcC0xQF9Es8kiU3wgbRfWqzlXbf6 BmwSIoFCdPSKo8v1O8Ag9zpGR3J5qUbt9zocTNb0PbzyyVMmAOVE8
dlcNzV8gUYZZcQWcjEmpflm4dVJC). Timestamp by third party at HvbqY9p89qtvDawmb2zZkqNl7Dr750pJ6G)
2021.07.14 09:59:29 CEST 2021.07.15 18:30:59 CEST
56
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
EUROPEAN HEALTH AND DIGITAL EXECUTIVE AGENCY
(HADEA)
HADEA.A – Health and Food
A.02 – EU4Health/SMP Food
ANNEX 1 (part A)
Project
NUMBER — 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Table of Contents
1.1. The project summary................................................................................................................................. 3
1.2. The list of beneficiaries..............................................................................................................................4
1.3. Workplan Tables - Detailed implementation..............................................................................................6
1.3.1. WT1 List of work packages........................................................................................................... 6
1.3.2. WT2 List of deliverables................................................................................................................ 7
1.3.3. WT3 Work package descriptions................................................................................................. 10
Work package 1......................................................................................................................... 10
Work package 2......................................................................................................................... 13
Work package 3......................................................................................................................... 17
Work package 4......................................................................................................................... 20
Work package 5......................................................................................................................... 23
Work package 6......................................................................................................................... 28
Work package 7......................................................................................................................... 31
Work package 8......................................................................................................................... 34
1.3.4. WT4 List of milestones................................................................................................................ 38
1.3.5. WT5 Critical Implementation risks and mitigation actions........................................................... 43
1.3.6 WT6 Summary of project effort in person-months........................................................................45
1.3.7. WT7 Tentative schedule of project reviews.................................................................................47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
1.1. The project summary
Project Number 1 101035467 Project Acronym 2 TEHDAS
One form per project
General information
Project title 3
Towards the European Health DAta Space Joint Action
Starting date 4 01/02/2021
Duration in months 5 30
Call (part) identifier 6 HP-JA-2020-1
JA-04-2020
• Addressing differences in national General Data Protection Regulation (GDPR)
Topic
implementation in the health sector, including the European Health Data Space and the
health data use
Fixed EC Keywords
data quality, eHealth, European Health Data Space, FAIR data, GDPR, governance,
Free keywords
health, health data, health systems, infrastructure, Joint Action, secodary use
Abstract 7
The Joint Action Towards the European Health Data Space (TEHDAS) is a consortium of 26 EU MS and other
countries that work to improve cross-border use of health data for the benefit of citizens’ health, for public health,
research and innovation.TEHDAS builds on earlier EU actions fostering the digital transformation of European health
systems. It contributes to responding to the Member States’ call at the October 2020 European Council to set up
a European Health Data Space and proposed by the von der Leyen Commission.The Joint Action helps Members
States and the Commission in developing and promoting concepts for sharing of data so that in the future Europe,
citizens, communities and companies benefit from a protected and seamless access to health data regardless where
it is stored.TEHDAS will suggest options for an operational framework and governance in order to overcome legal
and technical differences between countries. TEHDAS is grounded on the principles of transparency, trust and citizen
empowerment. It will work on technical and semantic challenges, propose services, architectural and infrastructural
elements required in the European Health Data Space.Citizens increasingly manage their data which requires a
better understanding and a European perspective. To maintain trust in fair and secure data sharing, TEHDAS will
suggest strengthened governance mechanisms for cross-sector use of health data in common data spaces at the EU
and Member State levels.TEHDAS will reach out and engage with many types of stakeholders to reflect their needs
and expectations, explore views on economic issues, and suggest concrete ways to integrate results into the future the
European Health Data Space.
Page 3 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
1.2. List of Beneficiaries
Project Number 1 101035467 Project Acronym 2 TEHDAS
List of Beneficiaries
Project Project
No Name Short name Country entry exit
month8 month
SUOMEN ITSENAISYYDEN
1 Sitra Finland 1 30
JUHLARAHASTO
BUNDESMINISTERIUM FUER
2 SOZIALES, GESUNDHEIT, PFLEGE UND ATNA Austria 1 30
KONSUMENTENSCHUTZ
3 SCIENSANO Sciensano Belgium 1 30
HRVATSKI ZAVOD ZA ZDRAVSTVENO
4 CHIF Croatia 1 30
OSIGURANJE
5 Ministry of Health of the Republic of Cyprus MoH-CY Cyprus 1 30
MINISTERSTVO ZDRAVOTNICTVI
6 MZCR Czech Republic 1 30
CESKE REPUBLIKY
7 REGION MIDTJYLLAND RM Denmark 1 30
8 SOTSIAALMINISTEERIUM MoSA Estonia 1 30
9 PLATEFORME DES DONNEES DE SANTE FR-HDH France 1 30
BUNDESMINISTERIUM FUER
10 BMG Germany 1 30
GESUNDHEIT
DIOIKISI 6IS YGEIONOMIKIS
PERIFEREIAS PELOPONNISOU
11 6th Y. PE. Greece 1 30
IONION NYSON IPEIROU KAI DYTIKIS
ELLADAS
12 ORSZAGOS KORHAZI FOIGAZGATOSAG OKFŐ Hungary 1 30
13 DEPARTMENT OF HEALTH DoH-IE Ireland 1 30
14 MINISTERO DELLA SALUTE MINSAL Italy 1 30
LIETUVOS RESPUBLIKOS SVEIKATOS
15 SAM-LT Lithuania 1 30
APSAUGOS MINISTERIJA
16 Ministry for Health - Government of Malta DHIR Malta 1 30
17 AGENTIA DE TRANSPLANT ATRM Moldova 1 30
MINISTERIE VAN VOLKSGEZONDHEID,
18 VWS Netherlands 1 30
WELZIJN EN SPORT
THE NORWEGIAN MINISTRY OF
19 MoH-NO Norway 1 30
HEALTH AND CARE SERVICES
SPMS - SERVICOS PARTILHADOS DO
20 SPMS Portugal 1 30
MINISTERIO DA SAUDE EPE
INSTITUT ZA ZASTITU ZDRAVLJA
21 IPHS "Batut" Serbia 1 30
SRBIJEDR MILAN JOVANOVIC BATUT
NACIONALNI INSTITUT ZA JAVNO
22 NIJZ Slovenia 1 30
ZDRAVJE
Page 4 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
1.2. List of Beneficiaries
Project Project
No Name Short name Country entry exit
month8 month
INSTITUTO ARAGONES DE CIENCIAS
23 IACS Spain 1 30
DE LA SALUD
24 E-HALSOMYNDIGHETEN SEHA Sweden 1 30
25 THE NHS CONFEDERATION NHSC United Kingdom 1 30
Page 5 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
1.3. Workplan Tables - Detailed implementation
1.3.1. WT1 List of work packages
WP Person- Start End
WP Title Lead beneficiary10
Number9 months11 month12 month13
WP1 Coordination of the project 1 - Sitra 50.00 1 30
WP2 Dissemination of the project 1 - Sitra 23.00 1 30
WP3 Evaluation of the project 20 - SPMS 11.00 1 30
Outreach, engagement and
WP4 3 - Sciensano 59.00 1 27
sustainability
WP5 Sharing data for health 24 - SEHA 109.00 1 24
WP6 Excellence in data quality 23 - IACS 89.25 1 24
WP7 Connecting the dots 23 - IACS 100.50 1 24
WP8 Citizens 9 - FR-HDH 85.50 1 24
Total 527.25
Page 6 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
1.3.2. WT2 list of deliverables
Due
Deliverable WP Dissemination
Deliverable Title Lead beneficiary Type 15 Date (in
Number14 number9 level16
months)17
Confidential,
only for members
D1.1 Project of the consortium
D1.1 WP1 1 - Sitra Report 4
Management Plan (including the
Commission
Services)
Confidential,
only for members
D1.2 Risk Management of the consortium
D1.2 WP1 1 - Sitra Report 4
Plan (including the
Commission
Services)
D1.3 D1.3 Interim report WP1 1 - Sitra Report Public 15
D1.4 D1.4 Final report WP1 1 - Sitra Report Public 30
Confidential,
only for members
MD2.1 Dissemination of the consortium
D2.1 WP2 1 - Sitra Report 4
plan (including the
Commission
Services)
D2.2 MD2.2 Leaflet WP2 1 - Sitra Report Public 4
Websites,
D2.3 MD2.3 Website WP2 1 - Sitra patents Public 3
filing, etc.
MD2.4 Layman
D2.4 version final technical WP2 1 - Sitra Report Public 30
report
Confidential,
only for members
of the consortium
D3.1 MD3.1 Evaluation plan WP3 20 - SPMS Report 5
(including the
Commission
Services)
MD3.2 Interim
D3.2 WP3 20 - SPMS Report Public 16
evaluation report
MD3.3 Final evaluation
D3.3 WP3 20 - SPMS Report Public 30
report
D4.1 D4.1 Country fact sheet WP4 3 - Sciensano Report Public 24
D4.2 Policy and Project
D4.2 WP4 3 - Sciensano Report Public 27
Forum Report
D4.3 D4.3 Sustainability plan WP4 1 - Sitra Report Public 24
D5.1 Report on
D5.1 WP5 3 - Sciensano Report Public 13
secondary use of health
Page 7 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Due
Deliverable WP Dissemination
Deliverable Title Lead beneficiary Type15 Date (in
Number14 number9 level16
months)17
data through European
case studies
D5.2 Guidelines/
Recommendations for
European countries
D5.2 WP5 24 - SEHA Report Public 22
when planning national
legislation on secondary
use of health data
D5.3 Recommendations
for best practices
for EU cross-border
D5.3 exchange including data WP5 9 - FR-HDH Report Public 24
access and data permit
processes in different
national settings
D5.4 Options for
D5.4 governance models for WP5 18 - VWS Report Public 19
the EHDS
D6.1 EHDS data
D6.1 quality assurance WP6 7 - RM Report Public 12
framework
D6.2 EHDS Semantic
D6.2 WP6 23 - IACS Report Public 20
interoperability framework
D7.1 Options for
the minimum set of
D7.1 services for secondary WP7 23 - IACS Report Public 12
use of health data in the
EHDS
D7.2 Options for
the services’ and
services architecture
D7.2 WP7 23 - IACS Report Public 24
and infrastructure for
secondary use of data in
the EHDS
D8.1 Qualitative study
conducted amongst
key stakeholders
(public, private actors,
D8.1 WP8 9 - FR-HDH Report Public 24
and patient / citizen
groups) to assess
citizen’s perception of
health data
D.8.2 Report on
lessons learned
to be applied and
D8.2 recommendations for WP8 12 - OKFŐ Report Public 24
data altruism practices
in the implementation
of construction of
Page 8 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Due
Deliverable WP Dissemination
Deliverable Title Lead beneficiary Type15 Date (in
Number14 number9 level16
months)17
national and European
health data spaces
Page 9 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
1.3.3. WT3 Work package descriptions
Work package number 9 WP1 Lead beneficiary 10 1 - Sitra
Work package title Coordination of the project
Start month 1 End month 30
Objectives
The objective of the WP is the high-quality overall management of the project and the consortium. This includes
establishing of the management structure, procedures, and guidelines for the operations, providing systematic
monitoring of the activities, establishing reporting guidelines, providing technical and financial reporting, and delivering
all necessary reports, including the Interim report and the Final report, administration of the Grant Agreement and the
Consortium Agreement, and general risk and ethics assessment.
The specific objectives are:
O1.1 High quality project management
O1.2 Timely and robust financial management and payments to beneficiaries
O1.3 Proactive control of contractual obligations according to the Grant agreement and Consortium agreements
O1.4 Sound internal communications between WPs and overall, according to the project management structure to keep
participants informed and up to date
O1.5 Close interaction with the European Commission and other EU institutions, agencies, and health policy entities
Description of work and role of partners
WP1 - Coordination of the project [Months: 1-30]
Sitra
Lead: Sitra
WP1 provides the overall project coordination, project management, financial management, and risks and ethics
management. This includes arranging the online and face-to-face (hybrid) meetings, conflict solving, and how
information will be exchanged among participants.
Project leadership: The TEHDAS Joint Action Coordinator will work in close cooperation with the project management
team and WP leaders to implement this project.
Task 1.1 Project coordination
Lead partner: Sitra; Duration: M1-M30
WP1 leader leads the Project Steering Group and coordinates the project. Deliverables and milestones are M1.1, M1.2,
and M1.4.
Task 1.2 Project management
Lead partner: Sitra; Duration: M1-M30
This task includes all processes listed in chapter 9. WP1 is responsible of the monitoring and overall execution of the
project. Deliverables and milestones are D1.1, D1.2, and M1.3.
Task 1.3 Financial management and reporting
Lead partner: Sitra; Duration: M1-M30
The project has specific and clear financial management and reporting rules specified by the operating agency of the
grant. WP1 is responsible on behalf of the whole project to manage the budget, report to the agency on the actual costs
and manage project finances. Deliverables and milestones are D1.3, and D1.4.
Task 1.4 Stakeholder cooperation and representing TEHDAS externally
Lead partner: Sitra, Duration: M1-M30
Where stakeholder engagement is distributed in thematic work packages in focus groups as well as to Work Package 4
with a policy forum and project forum, the TEHDAS joint action needs bilateral engagement with target policy entities
listed in Chapter 3. The most evident relationship is with the European Commission and its’ operating agency Chafea.
WP1 is responsible of those relationships as well as representing TEHDAS externally. A milestone is M1.5.
Page 10 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Participation per Partner
Partner number and short name WP1 effort
1 - Sitra 50.00
Total 50.00
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in
Number14
months)17
Confidential, only
for members of the
D1.1 Project
D1.1 1 - Sitra Report consortium (including 4
Management Plan
the Commission
Services)
Confidential, only
for members of the
D1.2 Risk Management
D1.2 1 - Sitra Report consortium (including 4
Plan
the Commission
Services)
D1.3 D1.3 Interim report 1 - Sitra Report Public 15
D1.4 D1.4 Final report 1 - Sitra Report Public 30
Description of deliverables
D1.1 Project Management Plan (M4)
D1.2 Risk Management Plan (M4)
D1.3 Interim report (M15)
D1.4 Final report (M30)
D1.1 : D1.1 Project Management Plan [4]
Project Management Plan
D1.2 : D1.2 Risk Management Plan [4]
Risk Management Plan
D1.3 : D1.3 Interim report [15]
Interim Report
D1.4 : D1.4 Final report [30]
Final Report
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
MS1 M1.1 Grant Agreement 1 - Sitra 3
MS2 M1.2 Consortium Agreement 1 - Sitra 3
MS3 M1.3 PSO Agreement 1 - Sitra 3
Page 11 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
M1.4 Progress reports to
M1.4 Progress reports to
MS4 1 - Sitra 5 General Assembly (M5, M15,
General Assembly
M27)
M1.5 Stakeholder Forums
MS5 M1.5 Stakeholder Forums 1 - Sitra 9
(M9, M16, M28)
Page 12 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Work package number 9 WP2 Lead beneficiary 10 1 - Sitra
Work package title Dissemination of the project
Start month 1 End month 30
Objectives
The WP creates an identity for the project and provides the key messages to communicate about the project which are
recognisable and deliver the purpose and importance of the work. The WP will make the deliverables and results of the
project well-known among target groups during and beyond the lifetime of the project. The project will be a relevant
stakeholder in the public dialogue regarding the European Health Data Space and especially the future of the secondary
use of health data in Europe.
The specific objectives are:
O2.1 To guarantee well-coordinated and timely communication in each stage of the Joint Action and to maximize the
effective dissemination of the JA’s efforts and results.
O2.2 Create an identity for the project and a shared idea of the key messages (goals & relevance) as basis of
communication.
O2.3 Make the deliverables and results of the project well-known among target groups during and beyond the lifetime
of the project.
Description of work and role of partners
WP2 - Dissemination of the project [Months: 1-30]
Sitra
Lead: Sitra
The basis of the strategic communications plan is to identify the relevant stakeholders as explained in Chapter 3, target
groups and networks and to engage (and build trust) accordingly in collaboration with WP4. For the communication
and dissemination activities to succeed, measurable goals for these activities will be set in the Dissemination Plan
(MD2.1). Effective communications and a shared view of the possibilities of health data is based on dialogue and
engagement between the JA and different stakeholders. WP2 focuses on public dissemination. WP4 focuses on
stakeholder involvement at operational level to share technical, scientific and political expertise within TEHDAS
between policy makers and relevant European initiatives.
To measure the effectiveness and the success of the dissemination activities and the success to reach the goals set in the
beginning of the work, an on-going media analysis on the topic will be conducted as well as systematic social media
monitoring. Also citizen polls can be a relevant tool. A more detailed stakeholder/target group analysis will be conducted
in the beginning of the Joint Action but on a general level at least following groups and channels to reach them can be
identified: Organisations and specialists working for/within TEHDAS Joint Action (Teams working space, webpage of
the JA, quarterly newsletter, materials distributed via email, regular summits, General Assembly & online meetings, etc.)
Stakeholders generating health data, i.a. individuals as citizens and patients, healthcare providers including primary
care, hospitals, healthcare professionals, research organisations, registries, biobanks, companies involved in wellbeing,
health, and health technology industries (main channels through which to reach them: dissemination of related
deliverables via webpage and social media, newsletter, media coverage, final report of the JA)
Stakeholders utilizing health data in the secondary use case, i.a. Health professionals, consulting and management
organizations, health industry (meetings, briefings, webpage, social media, newsletter, media coverage, final report of
the JA)
Stakeholders guarding access to and protecting data, i.a. legislators, policy makers, data permit authorities and decision
makers both on national and European level (meetings, briefings, webpage, newsletter, media coverage, final report
of the JA)
European citizens (identifying and understanding the on-going public debate on health data both on social media
channels and in traditional media, surveys, possible online-seminars etc., in close relation to the work done in WP8)
The Tasks of the WP2 are:
Task 2.1 Plan dissemination activities
Lead partner: Sitra; Duration: M1-M30
Page 13 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Strategic communication including timing of the communication activities with external events such as legal proposals
from the European Commission, EU presidency events and other important external events. TEHDAS work is very
much linked to other activities which take place planned or unplanned regardless of the timeline of our activities. Both
proactive and reactive communications are needed to support TEHDAS and EHDS. A deliverable is MD2.1 Task 2.2
Create and maintain website for the JA
Lead partner: Sitra; Duration:M1-M30
Website is of the first point of contact for stakeholders which are not in the inner circle of TEHDAS. They must serve
wide range of stakeholders and provide up-to-date and accurate information of TEHDAS and EHDS and promote them
and support the overall work. Deliverables are MD2.3 and MD2.4.
Task 2.3 Maintain active presence and dialogue on social media and in other relevant channels
Lead partner: Sitra, Duration: M1-M30
Social media presence is not a task of a single work package or an individual such as communication manager. However,
TEHDAS will have an official social media accounts in selected social media channels as well as social media strategy.
This task is responsible of the social media presence and dialogue and giving guidance to other project participants
on how to engage stakeholders in a dialogue related to EHDS and its targets. Deliverables and milestones are MD2.2,
M2.1 and M2.2.
Task 2.4 Work packages related communications
Lead partner: Sitra; Duration: M1-M30
Thematic WPs have communication needs especially when a deliverable or milestone is completed. This task supports
all WPs in their communication and manages possible public consultation processes on their behalf. Milestones are
M2.4 and M2.5.
Task 2.5 Maintain contacts and direct communication
Lead partner: Sitra, Duration: M1-M30
While social media has replaced newsletters as a main communicational mechanism, newsletters and other targeted
communications still serve a purpose in summarizing the progress for stakeholders which do not follow the project
closely. A contact list of interested stakeholders is also needed to activate stakeholders regarding events and
consultations. Milestone are M2.3 and M2.6.
Task 2.6 Communication reach and tracking
Lead partner: Sitra, Duration: M1-M30
Media and social media coverage are great tools to understand both generic and specialists’ discourse over EHDS.
Understanding how our project is covered and how much visibility targeted communications reach will enable more
efficient communication and possibility to adapt key messages if necessary. A milestone is M2.7.
Participation per Partner
Partner number and short name WP2 effort
1 - Sitra 23.00
Total 23.00
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in
Number14
months)17
Confidential, only
for members of the
MD2.1 Dissemination
D2.1 1 - Sitra Report consortium (including 4
plan
the Commission
Services)
Page 14 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
D2.2 MD2.2 Leaflet 1 - Sitra Report Public 4
Websites,
D2.3 MD2.3 Website 1 - Sitra patents filing, Public 3
etc.
MD2.4 Layman
D2.4 version final technical 1 - Sitra Report Public 30
report
Description of deliverables
MD2.1 Dissemination plan (M4)
MD2.2 Leaflet (M4)
MD2.3 Website (M3)
MD2.4 Layman version final technical report (M30)
D2.1 : MD2.1 Dissemination plan [4]
The Dissemination Plan explains how the project plans to share outcomes with stakeholders, including public
authorities. This dissemination plan includes what will be disseminated, to whom, why, how, and when.
D2.2 : MD2.2 Leaflet [4]
A summary leaflet promoting the project
D2.3 : MD2.3 Website [3]
The TEHDAS website is a dedicated website, summarising the project’s objectives and progress. There can be a
public part and one accessible only to the participants.
D2.4 : MD2.4 Layman version final technical report [30]
The Layman version is the End of project booklet for the public. It is a summary of the outcomes, main results,
achievements, benefits, written for the interested public as a target group.
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
M2.1 Open Call for
MS6 1 - Sitra 2
Stakeholders
M2.2 Quarterly newsletters
MS7 M2.2 Quarterly newsletters 1 - Sitra 3 (M3, M5, M8, M11, M14,
M17, M20, M23)
M2.3 Stakeholder
M2.3 Stakeholder
MS8 1 - Sitra 12 consultations (M12, M16,
consultations
M18)
M2.4 Dissemination reports
MS9 M2.4 Dissemination reports 1 - Sitra 6 (M6, M12, M15, M18, M21,
M24, M27)
Page 15 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
M2.5 Dissemination activity
M2.5 Dissemination activity
MS10 1 - Sitra 3 checks with WPs (M3, M7,
checks with WPs
M11, M15, M19, M23)
M2.6 Stakeholder contact list
MS11 M2.6 Stakeholder contact list 1 - Sitra 3 (M3, M5, M8, M11, M14,
M17, M20, M23, M29)
M2.7 Coverage metrics and
M2.7 Coverage metrics and
MS12 1 - Sitra 3 follow-up (M2, M6, M10,
follow-up
M14, M18, M22, M26, M30)
Page 16 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Work package number 9 WP3 Lead beneficiary 10 20 - SPMS
Work package title Evaluation of the project
Start month 1 End month 30
Objectives
Objectives
The success of this JA depends on the effectiveness in accomplishing defined goals and objectives. The overall aim
of WP 3 is to assess the degree to which the TEHDAS JA achieves its defined objectives and has an impact in the
target groups.
The objectives are:
O3.1 Develop a concise and structured internal evaluation plan with a focus on the general project objectives and the
specific objectives of individual WPs.
The evaluation plan will comprise three distinct components in the evaluation design: process evaluation, output
evaluation, outcome evaluation. It will include a clear description of the methods for evaluation, indicators and measures
of verification based on the specific objectives. This will ensure the adequate framework to assess if the Joint Action
is being implemented as planned and reaches its foreseen objectives.
The internal evaluation plan will describe the rational and design of evaluation activities so that quality assurance of
deliverables is performed by partners that are not involved in the in the specific outputs/deliverables that are being
assessed/evaluated.
Also, to ensure consistency of deliverables and consistency of the quality review process (see Chapter 9.3), every
deliverable to the target group should undergo a common, predefined, quality review checklist (to be provided to
evaluators). The quality review will be incorporated as an integral part of the JA evaluation reports.
Description of work and role of partners
WP3 - Evaluation of the project [Months: 1-30]
SPMS
Lead: SPMS
Task 3.1 Develop the evaluation strategy
Lead partner: SPMS, Duration: M1-M5
The evaluation strategy will describe the rationale of project´s internal evaluation plan and will be developed at the
beginning of the JA, in close collaboration with WP1. The evaluation strategy focus will be in defining a robust
methodology to identify indicators that provide an insight into the extent to which processes, outputs and outcomes
are being realized and meet user’s needs. The evaluation plan will outline evaluation objectives, systematic methods
for collecting and measure evaluation data, what will be evaluated, responsibilities and roles for the evaluation and the
timeline of evaluation activities. A deliverable is MD3.1.
To ensure consistent quality of deliverables this WP will support, in collaboration with WP 1, a quality assurance
framework to ensure every deliverable for the target group will undergo a predefined revision before approval by the
Project Steering Group. To ensure quality in legal or technical aspects, this work may engage external matter experts in
the revision panel. Deliverables and milestones are MD3.2, MD3.3, M3.2 and M3.3.
Task 3.2 Conduct evaluation activities
Lead partner: SPMS, Duration: M5-M24
WP3 will verify and assess how the delivered inputs (i.e. deliverables) of the Action have satisfied the needs and
expectations of the target group and how the JA coordination has achieved MS involvement, dissemination, and
sustainability of project results. The evaluation activities will focus on the main target group but also on the performance
of the WPs delivering input. WP3 will further analyse the impact of the work done by WP4-WP8 on the main priority
areas defined in the JA. Evaluation methods and tools will be defined for data to be collected from WPs, WP leaders
and relevant participants (as applicable) as well as from target group representatives. A milestone is M3.1.
Task 3.3. Analyse evaluation data
Lead partner: SPMS, Duration: M5-M30
Page 17 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
WP3 will collect and analyse data and perform evaluation of the JA at regular intervals. The key deliverables will be
continuously monitored, and results presented in the interim evaluation report and the final evaluation report. The interim
evaluation report will give special attention to deviation from the timeline of the project plan. The final evaluation report
will focus on the registry of milestones and deliverables achievement by each WP, including the quality of outputs. It
will engage stakeholders in the analysis of gathered evidence to justify conclusions and ensure use of lessons learned.
Participation per Partner
Partner number and short name WP3 effort
20 - SPMS 11.00
Total 11.00
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
Confidential, only
for members of the
D3.1 MD3.1 Evaluation plan 20 - SPMS Report consortium (including 5
the Commission
Services)
MD3.2 Interim
D3.2 20 - SPMS Report Public 16
evaluation report
MD3.3 Final evaluation
D3.3 20 - SPMS Report Public 30
report
Description of deliverables
MD3.1 Evaluation plan (M5)
The Evaluation Plan will define the design and timeline of project´s evaluation activities.
MD3.2 Interim evaluation report (M16)
The interim evaluation report will assess the intended outcomes, outputs, and the success indicators in the mid-term.
MD3.3 Final evaluation report (M30)
The final evaluation report will draw on the interim evaluation report to provide the results of the evaluation, with
concluding remarks to the entire JA.
D3.1 : MD3.1 Evaluation plan [5]
The Evaluation Plan will define the design and timeline of project´s evaluation activities, including indicators, data
sources, methods, and stakeholder analysis.
D3.2 : MD3.2 Interim evaluation report [16]
The interim evaluation report will assess the intended outcomes, outputs, and the success indicators in the mid-term.
D3.3 : MD3.3 Final evaluation report [30]
The final evaluation report will draw on the interim evaluation report to provide the results of the evaluation, with
concluding remarks to the entire JA.
Page 18 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
M3.1 Evaluation tools and
MS13 20 - SPMS 9
templates
M3.2 Draft interim evaluation
MS14 20 - SPMS 12
report
M3.3 Draft final evaluation
MS15 20 - SPMS 28
report
Page 19 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Work package number 9 WP4 Lead beneficiary 10 3 - Sciensano
Work package title Outreach, engagement and sustainability
Start month 1 End month 27
Objectives
The aim of this Work Package is, in close collaboration with all Work Packages, to outreach and engage national
and international players, for TEHDAS to reflect their needs and expectations, and to explore views on its economic
sustainability as well as to suggest concrete ways to integrate the results into the future EHDS.
The objectives are:
O4.1 Provide an overview of national health data developments which include a reflection on needs and expectations
at national and international level to allow alignment of TEHDAS’ activities,
O4.2 Create a solid base for regular exchange and support for current and future EHDS activities,
O4.3 Explore views of the value that could be created to share secondary data across Europe and EHDS
O4.4 Propose a sustainability plan with a roadmap for further EHDS implementation.
Description of work and role of partners
WP4 - Outreach, engagement and sustainability [Months: 1-27]
Sciensano, Sitra, MZCR, OKFŐ, DHIR, IPHS "Batut", NIJZ, SEHA
Lead: Sciensano
Task 4.1 Mapping countries expectations through country visits
Lead partner: Sciensano; Partners: MZCR, OKFŐ, DHIR, RS, NIJZ, SEHA, DoH-IE (HRB), OKFŐ (SU) Duration:
M1-M24
Through (virtual) country visits, a mapping is carried out to provide an overview of national health data developments
and statuses, building on the Assessment of the EU Member States’ and other participating countries’ rules on health
data in the light of GDPR report. Some countries have developed national health data hubs others have indicated interest
in developing one. Making use of the diversity in Europe, a selection of countries in different stages of development and
different health systems will be visited. The visits will allow to reflect on needs and expectations at national level and
reflect on how TEHDAS and the EHDS can respond to them. MS/AC authorities and stakeholders will be mobilised and
involved in the process providing an opportunity to exchange views. It will also provide an opportunity to familiarise
TEHDAS to various stakeholders in the field. A subtask will respond to national needs put forward during the mapping
exercise and respond by facilitating short targeted online training courses in collaboration with identified initiatives and
projects in Task 4.2, which serves the capacity building needs in countries. WP leaders will be involved by providing
an overview of what MS/AC authorities can expect from TEHDAS and will be engaged by providing input on what the
mapping tool should include for their WP. Deliverables and milestones D4.1 and M4.1.
Task 4.2 Policy and Project Forum to integrate in national and international landscape
Lead partner: Sciensano; Partners: Sitra, MZCR, DHIR, NIJZ, SEHA, SEHA (PHAS), DoH-IE (HRB). Duration: M1-
M27
To be integrated in the national and international landscape, it is key to engage with national and international
stakeholders and initiatives. Two different levels of interaction are needed: policy level and project level. At policy level,
MS/AC national authorities and international organisations will be engaged through a Political Forum. The progress
of the different WPs will be presented and potential routes for sustainable interaction will be sought. At project level,
connectivity with European initiatives and projects will be sought to build TEHDAS on previous projects. In preparation,
a mapping exercise will be carried out to identify relevant initiatives TEHDAS. This includes, amongst others, BRIDGE
Health, the Joint Action on Health Information (InfAct) PARENT, JASEHN, eHAction, eHDSI, the Health Research and
Innovation Cloud, the European Open Science Cloud and the Population Health Information Research Infrastructure,
the 1+ Million Genomes initiative, ELIXIR, Global Alliance for Genomics and Health GA4GH.org. These initiatives
will be invited to participate to the Project Forum to share relevant outputs, to build on previous findings and to discuss
potential synergies to avoid duplication.
The Fora will bring key initiatives together, build on what has been done and strive towards making outcomes
interoperable. Four Policy and Project Forum will be organised back to back in close collaboration with the WP leaders.
As part of Task 4.2 and building on Task 4.1, this task will explore views on the value of sharing secondary data across
Page 20 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Europe, potentially through an EHDS and ideas how to distribute the value (co-)created through EHDS. One of the
Policy and Project Forum will be used to discuss this topic. The views and experience of MS/AC national authorities
and international projects will be collected. Deliverables and milestones D4.2 and M4.2.
Task 4.3 Sustainability plan
Lead partner: Sitra; Partners: Sciensano, MZCR, OKFŐ, DHIR, OKFŐ (SU); Duration: M1-M24
In close collaboration with WP leaders, this task will develop a sustainability plan which considers also economic needs
in setting up the EHDS; business models of designated agencies will be discussed in WP5. The sustainability plan will
be a pragmatic approach to a roadmap providing recommendations on future implementation of EHDS. It will pay
timely attention to policy proposals on EU data spaces and consider their evolving implementation, if necessary, an
interim version of the plan will be provided.
The sustainability plan will include outputs from each of the WPs including the results from the country visits. Task 4.3
will also map early on which existing data infrastructures can be leveraged on and could be building blocks of EHDS
and assess how they could potentially be linked. Deliverables and milestones D4.3 and M4.3.
Participation per Partner
Partner number and short name WP4 effort
1 - Sitra 8.00
3 - Sciensano 29.00
6 - MZCR 3.00
12 - OKFŐ 2.00
SU 2.00
16 - DHIR 5.00
21 - IPHS "Batut" 1.00
22 - NIJZ 5.00
24 - SEHA 2.00
PHAS 2.00
Total 59.00
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
D4.1 D4.1 Country fact sheet 3 - Sciensano Report Public 24
D4.2 Policy and Project
D4.2 3 - Sciensano Report Public 27
Forum Report
D4.3 D4.3 Sustainability plan 1 - Sitra Report Public 24
Description of deliverables
D4.1 Country fact sheet (M24)
A fact sheet from each country visit will be provided providing an overview of the mapping exercise.
D4.2 Policy and Project Forum Report (M27)
The Policy and Project Forum Report provides the minutes and conclusions of the meetings.
D4.3 Sustainability plan (M24)
Page 21 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
The sustainability plan will provide a pragmatic approach to a roadmap providing recommendations on future
implementation of EHDS. It will provide the outputs of the different WPs and recommendations on how they can be
taken up at national and international level.
D4.1 : D4.1 Country fact sheet [24]
A fact sheet from each country visit will be provided providing an overview of the mapping exercise.
D4.2 : D4.2 Policy and Project Forum Report [27]
The Policy and Project Forum Report provides the minutes and conclusions of the meetings.
D4.3 : D4.3 Sustainability plan [24]
The sustainability plan will provide a pragmatic approach to a roadmap providing recommendations on future
implementation of EHDS. It will provide the outputs of the different WPs and recommendations on how they can be
taken up at national and international level.
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
In close collaboration with
all WPs leaders a template
will be developed for the
country visit mapping tool.
It will provide the key topics
M4.1 Template of mapping that will be mapped through
MS16 tool and Expressions of 3 - Sciensano 6 the exercise and describe
Interest the process for the country
visits. A call for expression
of interest will be launched
to select countries for the
mapping exercise based on
the TEHDAS consortium.
M4.2 Policy and Project M4.2 Policy and Project
MS17 3 - Sciensano 4
Forum Forum (M4, M9, M16, M26)
M4.3 Mapping of the existing
MS18 1 - Sitra 8
infrastructures to build on
Page 22 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Work package number 9 WP5 Lead beneficiary 10 24 - SEHA
Work package title Sharing data for health
Start month 1 End month 24
Objectives
Overall objective is: Setting options for the operational framework and governance models for the exchange and
secondary use of health data between European countries, respecting the principles of transparency, trust, FAIRness*,
citizen empowerment and common good.
Specific objectives are:
O5.1 Define and develop the evidence base for the secondary use of health data in EHDS, user perspectives
O5.2 Enable cross-border exchange and secondary use of health data through guidelines/recommendations for European
countries when planning national legislation.
O5.3 Create guidelines for an organizational framework for cross-border exchange of personal health data based on a
single point of access model connecting centralized as well as decentralized systems in the EHDS and support national
capacity building.
O5.4 Develop options for governance models for the EHDS and support national capacity building.
Description of work and role of partners
WP5 - Sharing data for health [Months: 1-24]
SEHA, Sitra, ATNA, Sciensano, CHIF, MZCR, RM, FR-HDH, 6th Y. PE., OKFŐ, MINSAL, SAM-LT, DHIR, VWS,
MoH-NO, SPMS, IPHS "Batut", NIJZ, IACS , NHSC
SEHA (Lead), VWS (Co-lead)
Task 5.1 Define and develop the evidence base for the secondary use of health data in EHDS, user perspectives
Task lead: Sciensano; Partners: MZCR, 6YPE, SAM-LT, MoH-NO (FHI), SPMS, IPHS “Batut”, NIJZ, IACS, SEHA,
NHSC, DoH-IE (HRB), MoSA, NHSC (WSI), ATRM, MoH-CY; Duration: M1-M13
Task 5.1 aims to define and develop the evidence for secondary use of health data by identifying data sharing practices
across Europe, to provide information to the European Health Data Space and the European Commission’s legislative
proposals.
Task 5.2 Enabling the secondary use of data by aligning the interpretation of GDPR
Task lead: SEHA; Partners: CHIF, MZCR, RM, OKFŐ, MINSAL, SAM-LT, DHIR, VWS, NIJZ, DoH-IE (HRB), CHIF
(CHIP), ATRM, MoSA, MoH-CY, OKFŐ (SU); Duration: M1-M22
This task initiates partially from the analysis of use cases in Task 5.1. to provide a multi-national and eventually Pan-
European health data access permitters'/providers' perspective on the interpretation of GDPR in relation to secondary
use (including cross-border data exchange). It provides permitters' and providers' perspective, and legal interoperability.
Task 5.3 Best practises for EU-cross border sharing of personal health data
Task lead: FR-HDH; Partners: Sitra (THL/Findata), VWS, IACS, FR-HDH (Inserm), FR-HDH (UT3); Duration: M1-
M24
In order to identify best practices for EU-cross border sharing of personal health data (permitters' perspective and
organisational interoperability), the four participating countries in this task offer a variety of solutions suitable for
differing situations and the necessary level of maturity to be considered as a good practice. The subtasks will focus on
the description of steps in accessing individual-level data for national and EU researchers in a selection of centralised
(FIN, FR) and decentralised systems (NL, ES) and the establishment of a framework of a bi- or multilateral partnership
agreement between structures responsible for the secondary use of health data.
Task 5.4 Developing options for governance models for the EHDS
Task lead: VWS; Partners: Sitra, ATNA, Sciensano, CHIF, RM, OKFŐ, MINSAL, MoH-NO, SPMS, IACS, SEHA,
NHSC, CHIF (CHIP), RM (CDEU), BMG, NHSC (WSI), OKFŐ (SU); Duration: M1-M19
This task will provide a synthesis of the other tasks of WP5, resulting in preliminary elements for governance models
at the end of the first iterative cycle.
Page 23 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Participation per Partner
Partner number and short name WP5 effort
1 - Sitra 1.00
THL 3.00
2 - ATNA 2.00
3 - Sciensano 8.00
4 - CHIF 1.20
CIPH 1.80
6 - MZCR 4.00
7 - RM 3.00
CDEU 1.00
9 - FR-HDH 4.75
UT3 2.00
Inserm 4.00
ANS 0.25
11 - 6th Y. PE. 2.00
12 - OKFŐ 2.00
SU 3.00
14 - MINSAL 3.00
15 - SAM-LT 4.00
16 - DHIR 2.00
18 - VWS 15.00
19 - MoH-NO 1.00
FHI 2.00
20 - SPMS 6.00
21 - IPHS "Batut" 1.00
22 - NIJZ 4.00
23 - IACS 8.00
24 - SEHA 16.00
25 - NHSC 3.00
WSI 1.00
Total 109.00
Page 24 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
D5.1 Report on
secondary use of health
D5.1 3 - Sciensano Report Public 13
data through European
case studies
D5.2 Guidelines/
Recommendations for
European countries
D5.2 24 - SEHA Report Public 22
when planning national
legislation on secondary
use of health data
D5.3 Recommendations
for best practices for EU
cross-border exchange
D5.3 9 - FR-HDH Report Public 24
including data access and
data permit processes in
different national settings
D5.4 Options for
D5.4 governance models for 18 - VWS Report Public 19
the EHDS
Description of deliverables
D5.1 Report on secondary use of health data through European case studies (M13)
This deliverable will present best practices identified in European case studies on the secondary use of data to
inform the European Health Data Space. This document will summarise on a multinational level the conclusions the
respective user categories included (scientific researcher and innovator, and policymaker respectively). The document
will also consolidate the analysis results of the literature review, use cases and stakeholder consultation. The use cases
will be presented in an annex to the document.
Task 5.1 aims to define and develop the evidence for secondary use of health data by identifying data sharing
practices across Europe, to provide information to the European Health Data Space and the European Commission’s
legislative proposals.
D5.2 Guidelines/Recommendations for European countries when planning national legislation on secondary use of
health data (M22)
This deliverable is a document presenting basic guidelines/recommendations intended to facilitate the planning (and
implementation) of national legislation on secondary use of health data.
These guidelines/recommendations are in turn based on a documented summary on a multinational level of the
experiences and conclusions of pioneering European countries that already have a national legislation of this kind, in
combination with the needs of other European countries in this respect.
D5.3 Recommendations for best practices for EU cross-border exchange including data access and data permit
processes in different national settings (M24)
In order to identify best practises for EU-cross border sharing of personal health data this deliverable will focus on
the description of steps in accessing individual-level data for national and EU researchers in a selection of centralized
and decentralized systems and the establishment of a framework of a partnership agreement between structures
responsible for the secondary use of health data. On this basis, use cases for cross-border collaborations for the
secondary use of health data in centralized and decentralized systems will be identified. Recommendations for best
practices for EU cross-border exchange including data access / data permit processes in different national settings will
be elaborated and tested in an EU-wide workshop
D5.4 Options for governance models for the EHDS (M19)
Page 25 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
This deliverable is a document presenting well-established options for governance models for the EHDS, taking into
consideration a Pan-European perspective in combination with the best interest of the concerned stakeholders in
general and the citizen.
D5.1 : D5.1 Report on secondary use of health data through European case studies [13]
This deliverable will present best practices identified in European case studies on the secondary use of data to
inform the European Health Data Space. This document will summarise on a multinational level the conclusions the
respective user categories included (scientific researcher and innovator, and policymaker respectively). The document
will also consolidate the analysis results of the literature review, use cases and stakeholder consultation. The use cases
will be presented in an annex to the document.
D5.2 : D5.2 Guidelines/Recommendations for European countries when planning national legislation on secondary
use of health data [22]
This deliverable is a document presenting basic guidelines/recommendations intended to facilitate the planning (and
implementation) of national legislation on secondary use of health data. These guidelines/recommendations are in
turn based on a documented summary on a multinational level of the experiences and conclusions of pioneering
European countries that already have a national legislation of this kind, in combination with the needs of other
European countries in this respect.
D5.3 : D5.3 Recommendations for best practices for EU cross-border exchange including data access and data permit
processes in different national settings [24]
In order to identify best practises for EU-cross border sharing of personal health data this deliverable will focus on
the description of steps in accessing individual-level data for national and EU researchers in a selection of centralized
and decentralized systems and the establishment of a framework of a partnership agreement between structures
responsible for the secondary use of health data. On this basis, use cases for cross-border collaborations for the
secondary use of health data in centralized and decentralized systems will be identified. Recommendations for best
practices for EU cross-border exchange including data access / data permit processes in different national settings will
be elaborated and tested in an EU-wide workshop.
D5.4 : D5.4 Options for governance models for the EHDS [19]
This deliverable is a document presenting well-established options for governance models for the EHDS, taking into
consideration a Pan-European perspective in combination with the best interest of the concerned stakeholders in
general and the citizen.
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
Identify and develop the
use cases to represent the
diversity of research user
groups across Europe. The
data collection will include
and compile information
M5.1 Use cases: Scientific regarding user purposes,
MS19 3 - Sciensano 4
research and innovation requirements, type of data
through an analysis of use
cases, previous relevant
studies, and stakeholder
consultation. This milestone
considers analysis of data on a
spectrum of identifiability.
Identify and develop the
M5.2 Use cases:
use cases to represent the
MS20 Policymaking for public 3 - Sciensano 5
diversity of policy makers
health purposes
across Europe. The data
Page 26 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
collection will include
and compile information
regarding purposes,
requirements, type of
data through an analysis
of relevant case studies,
previous relevant studies,
and stakeholder consultation.
This milestone considers
analysis of data on a spectrum
of identifiability.
Data collection concluded and
M5.3 GDPR interpretations compiled regarding health
in the secondary use of health data access permitters and
MS21 data in different member 9 - FR-HDH 6 providers in the different
states and other participating MS regarding GDPR
countries interpretations based on the
use cases above.
M5.4 Description of steps in
accessing individual-level
data for national and EU
MS22 9 - FR-HDH 12
researchers in a selection
of centralized systems and
decentralized systems
M5.5 Guideline document
for a peer-to- peer and cross-
MS23 9 - FR-HDH 12
border partnership for the
secondary use of health data
M5.6 Compilation of best
practices for EU cross-
border exchange including
MS24 9 - FR-HDH 24
data access and data permit
processes in different national
settings
M5.7 Analysis of health
MS25 specific governance aspects 18 - VWS 5
for an EHDS
M5.8 Analysis of the capacity
of existing EU structures
and options on how the
MS26 governance aspects defined in 18 - VWS 7
M5.7 can be made within the
current structures or with new
structures
Page 27 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Work package number 9 WP6 Lead beneficiary 10 23 - IACS
Work package title Excellence in data quality
Start month 1 End month 24
Objectives
WP6 will be providing solutions for the trustworthy secondary use of health and health care data with a view to fostering
the digital transformation of the European health systems.
This overarching objective will be developed throughout two operational objectives:
O6.1 Developing the EHDS data quality assurance framework for a secondary use of real-world health data.
O6.2 Developing the EHDS Semantic Interoperability framework
From the perspective of information users and data producers, data are deemed of quality if data faithfully depict the
real-world construct that it aims at representing.
For the TEHDAS JA, the real-world construct has to do with the digital transformation of the health systems in
Europe, that must rely on the secondary use of massive data; thus, data routinely collected by multiple data holders
and controllers in multiple sites throughout the European Union. The secondary use of health data, beyond the legal,
governance and ethical questions, has as the main challenge to ensure that data collected and stored for different purposes
is accurate to provide high-quality real-world evidence and by this means, inform national and European decision-
making processes in a trustworthy and timely manner. In addition, the increasing use of sophisticated methodologies
(for example, development of pragmatic trials, the use predictive machine learning or exploratory artificial intelligence
approaches) creates also new demands on data quality.
In that sense, the secondary use of real-world data (RWD) requires a quality assurance framework, but also guidance
on what methods and techniques has been proved reliable to ensure the production of accurate evidence; thus, it will be
needed to explore what methods and techniques allow the mitigation of data incompleteness and missingness, how to
achieve semantic interoperability, how to reach over time data consistency, or conduct unbiased analyses.
Notably, excellence in the secondary use of real-world data should fit-for-purpose; so, data quality must be responsive to
the needs of the different information users. So, policy makers (e.g., in their role of planning and financing), regulators
(e.g., in their legislative role), health technology assessment agencies (e.g., as regulators for the approval of high-value
technologies), insurers (e.g., in the role of services purchasers), providers (e.g., pursuing the delivery of high-quality
services), patients (e.g., as beneficiaries of the health system), citizens (e.g., as active agents for health promotion),
the health industry in Europe (e.g., in their role of producers of high-value goods and services) and researchers (e.g.,
in their role of producers of real-world evidence). WP6 developments will have to be consistent with the architectural
design in WP7 (i.e.., a peer-to-peer federated infrastructure whose nodes are of a different nature (member states, other
participating countries, cross-national institutions, research infrastructures) and with the need of translating the data
quality framework into a legal proposal.
Description of work and role of partners
WP6 - Excellence in data quality [Months: 1-24]
IACS , Sitra, ATNA, Sciensano, MZCR, RM, FR-HDH, OKFŐ, MINSAL, VWS, MoH-NO, SPMS, SEHA
WP6 IACS (Lead), RM (Co-lead)
T6.1 Develop the EHDS Data quality assurance framework (DQAF)
Task leader: RM, Partners: Sitra (THL), ATNA, Sciensano, FR-HDH, OKFŐ, MINSAL, SPMS, IACS, RM (CDEU),
FR-HDH (Inserm), FR-HDH (AMU), DoH-IE (HRB), OKFŐ (SU); MoH-NO (Hdir) Duration: M1-M24
Subtask 6.1.1: Assessment of DQAF good practices.
Partners involved: RM, Sitra (THL), ATNA, Sciensano, FR-HDH, OKFŐ, MINSAL, SPMS, IACS, RM (CDEU), FR-
HDH (Inserm), FR-HDH (AMU), DoH-IE (HRB), OKFŐ (SU).
Subtask 6.1.2 Assessment of existing European legislation.
Partners involved: RM, Sitra (THL), ATNA, Sciensano, FR-HDH, OKFŐ, MINSAL, SPMS, IACS, RM (CDEU), FR-
HDH (Inserm), FR-HDH (AMU), DoH-IE (HRB), OKFŐ (SU).
T6.2 Develop the EHDS Semantic Interoperability Framework
Page 28 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Task leader: IACS, Partners: Sitra (THL), ATNA, RM, FR-HDH, OKFŐ, MINSAL, MoH-NO (E-helse), SPMS, SEHA,
FR-HDH (Inserm), FR-HDH (HCL), FR-HDH (ANS), BMG (Gematik), VWS(Nictiz), OKFŐ (SU), MZCR, E-helse-
NO; Duration: M3-M20
Subtask 6.2.1: Assessment of existing Common Data Models for P2P federated infrastructures.
Partners involved: IACS, Sitra (THL), ATNA, RM, FR-HDH, OKFŐ, MINSAL, MoH-NO (E-helse), SPMS, SEHA,
FR-HDH (Inserm), FR-HDH (HCL), FR-HDH (ANS), BMG (Gematik), VWS(Nictiz), OKFŐ (SU),
Subtask 6.2.2: Development of a EHDS semantic interoperability framework.
Partners involved: IACS, Sitra (THL), ATNA, RM, FR-HDH, OKFŐ, MINSAL, VWS(Nictiz), MoH-NO (E-helse),
SPMS, SEHA, FR-HDH (Inserm), FR-HDH (HCL), FR-HDH (ANS), BMG (Gematik), VWS(Nictiz), OKFŐ (SU),
MZCR
Participation per Partner
Partner number and short name WP6 effort
1 - Sitra 0.00
THL 7.00
2 - ATNA 2.00
3 - Sciensano 2.00
6 - MZCR 1.00
7 - RM 12.00
CDEU 1.00
9 - FR-HDH 1.75
AMU 3.00
Inserm 4.00
HCL 1.50
ANS 0.25
12 - OKFŐ 2.00
SU 2.00
14 - MINSAL 4.00
18 - VWS 0.00
Nictiz 2.00
19 - MoH-NO 0.00
E-helse 2.00
Hdir 2.00
20 - SPMS 7.00
23 - IACS 30.75
24 - SEHA 2.00
Total 89.25
Page 29 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
D6.1 EHDS data quality
D6.1 7 - RM Report Public 12
assurance framework
D6.2 EHDS Semantic
D6.2 23 - IACS Report Public 20
interoperability framework
Description of deliverables
D6.1 EHDS data quality assurance framework (M12, M24).
The deliverable will contain two types of contents: 1) the requisites for the inclusion of data in the EHDS, including
semantic interoperability; among those, the document will identify those features that could be legally bound; and, 2)
guidance on how to get data included in the EHDS, including requisites for data interoperability (i.e., data model and
encoding systems) and recommendations for data quality governance. In Month 24, D6.1 will be upgraded with the
EHDS sematic interoperability framework delivered in Month 20.
D6.2 EHDS Semantic interoperability framework (M20)
The deliverable will propose a semantic interoperability framework for the EHDS including the common data
model for the EHDS. (NB T6.2 links with WP5 as the semantic interoperability framework is a key feature of the
governance of a federated infrastructure. Its deliverable should also link with WP7 as the CDM is the underlying
layer supporting part of the services envisaged).
D6.1 : D6.1 EHDS data quality assurance framework [12]
The deliverable will contain two types of contents: 1) the requisites for the inclusion of data in the EHDS, including
semantic interoperability; among those, the document will identify those features that could be legally bound; and, 2)
guidance on how to get data included in the EHDS, including requisites for data interoperability (i.e., data model and
encoding systems) and recommendations for data quality governance. In Month 24, D6.1 will be upgraded with the
EHDS sematic interoperability framework delivered in Month 20.
D6.2 : D6.2 EHDS Semantic interoperability framework [20]
The deliverable will propose a semantic interoperability framework for the EHDS including the common data
model for the EHDS. (NB T6.2 links with WP5 as the semantic interoperability framework is a key feature of the
governance of a federated infrastructure. Its deliverable should also link with WP7 as the CDM is the underlying
layer supporting part of the services envisaged).
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
M6.1 Identification of those
features that could be legally
MS27 7 - RM 9
bound and provide advice to
the European Commission
M6.2 Identification of
relevant encoding standards
MS28 23 - IACS 12
and data models for semantic
harmonization
Page 30 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Work package number 9 WP7 Lead beneficiary 10 23 - IACS
Work package title Connecting the dots
Start month 1 End month 24
Objectives
This work package will detail the technical options to provide an effective secondary use of health data through the
EHDS. In this way, these solutions represent the technical interoperability elements of the EHDS, according to the
European Interoperability Framework.
The key concept for the envisaged EHDS is a federated peer-to-peer system, that interconnect node of different
typologies (data permit authorities, European level health data providers, research infrastructures, data altruism bodies
etc.). The EHDS nodes will operate regularly in an independent manner, providing services to their users, but as part
of the federation they will be connected. The interconnection will be implemented through a series of specific EHDS
services deployed on to provide federation-wide features, such as: announcement, authentication, data discovery, data
retrieval, data analytics, etc.
Work package deliverables will consist of the catalogue of required and advanced services to be implemented in the
nodes aiming to join the EHDS and the options for the architecture and the infrastructure elements required for an
effective deployment of the services.
WP objectives are:
O7.1 Study existing initiatives on secondary use of health data focusing on the requirements for their deployment
O7.2 Foster the participation of future users of the EHDS and EHDS implementers on MSs, institutions or industry,
to participate in the co-design of the services for secondary use of health data as well to provide architecture and
infrastructure options.
O7.3 Define the options for the EHDS services for secondary use of health data
O7.4 Detail the architecture and infrastructure options of the EHDS services for secondary use of health data, fully
compliant with legal frameworks and with total guarantee of privacy and security.
Description of work and role of partners
WP7 - Connecting the dots [Months: 1-24]
IACS , Sitra, ATNA, Sciensano, MZCR, RM, FR-HDH, OKFŐ, MINSAL, SPMS, SEHA
Lead: IACS
Task 7.1 Technical and operational expertise of existing initiatives of data sharing and secondary use of health and
biomedical data
Task lead: Sitra (CSC) Partners: ATNA, SPMS, IACS, FR-HDH. Duration: M1-M10.
Inquire and gather existing knowledge on public and/or private initiatives on data sharing and the secondary use of
health and biomedical data.
Task 7.2 WP7 Permanent Advisory Group
Task lead: Sitra (VTT), Partners: MINSAL, SPMS, IACS, SEHA, DoH-IE (HRB), SEHA (NBHW), FR-HDH. Duration:
M01-M24.
Task 7.3 Definition of services for secondary use of data within the EHDS
Task lead: IACS. Partners: Sitra (CSC), Sciensano, MZCR, FR-HDH, OKFŐ, MINSAL, OKFŐ (SU) Duration: M01-
M18.
Description of the services to be implemented in the federated nodes that will support the secondary use of health data
within the EHDS, in an incremental manner.
Task 7.4 Options for EHDS architecture and infrastructure of the EHDS services’ deployment
Task lead: IACS. Partners: Sitra (VTT), ATNA, Sciensano, RM, OKFŐ, BMG (FDZ), RM (CDEU), OKFŐ (SU), FR-
HDH. Duration: M09-M24.
To provide specific options for the architecture and the infrastructure that will support the deployment of the EHDS
services among participating nodes.
Participation per Partner
Page 31 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Partner number and short name WP7 effort
1 - Sitra 0.00
VTT 10.00
CSC 9.00
2 - ATNA 3.00
3 - Sciensano 5.00
6 - MZCR 2.00
7 - RM 2.00
CDEU 1.00
9 - FR-HDH 4.00
12 - OKFŐ 3.00
SU 2.00
14 - MINSAL 3.00
20 - SPMS 8.00
23 - IACS 45.50
24 - SEHA 1.00
NBHW 2.00
Total 100.50
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in
Number14
months)17
D7.1 Options for the
minimum set of services
D7.1 23 - IACS Report Public 12
for secondary use of
health data in the EHDS
D7.2 Options for
the services’ and
services architecture
D7.2 23 - IACS Report Public 24
and infrastructure for
secondary use of data in
the EHDS
Description of deliverables
D7.1 Options for the minimum set of services for secondary use of health data in the EHDS (M12)
Document containing the API of services options required to be deployed in MS or other institutions wanting to join
the EHDS federation for the basic operation of the EHDS.
D7.2 Options for the services’ and services architecture and infrastructure for secondary use of data in the EHDS.
(M24)
Document containing the API of the service options for basic and advanced EHDS operation, as well as the
options for the architecture and infrastructure that will sustain the actual deployment of the services in MS or other
institutions wanting to join the EHDS.
Page 32 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
D7.1 : D7.1 Options for the minimum set of services for secondary use of health data in the EHDS [12]
Document containing the API of services options required to be deployed in MS or other institutions wanting to join
the EHDS federation for the basic operation of the EHDS.
D7.2 : D7.2 Options for the services’ and services architecture and infrastructure for secondary use of data in the
EHDS [24]
Document containing the API of the service options for basic and advanced EHDS operation, as well as the
options for the architecture and infrastructure that will sustain the actual deployment of the services in MS or other
institutions wanting to join the EHDS.
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
M7.1 Technical and
operational analysis report
of existing data sharing and/
MS29 1 - Sitra 8 Task Lead: Sitra (CSC)
or secondary use initiatives
in health and biomedical
sciences.
M7.2 Report on EHDS
MS30 1 - Sitra 9 Task Lead: Sitra (VTT)
services users’ expectations.
M7.3 Report on EHDS
architecture and infrastructure
MS31 1 - Sitra 16 Task Lead: Sitra (VTT)
implementers’ expectations /
experiences.
M7.4 Validation report on
the proposed services and
MS32 1 - Sitra 22 Task lead: Sitra (VTT)
architecture and infrastructure
solutions.
M7.5 Catalogue of the EHDS
MS33 services for secondary use of 23 - IACS 10
health data.
M7.6 Report on architecture
and infrastructure options to
MS34 23 - IACS 22
support EHDS services for
secondary use of data.
Page 33 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Work package number 9 WP8 Lead beneficiary 10 9 - FR-HDH
Work package title Citizens
Start month 1 End month 24
Objectives
WP8 will provide evidence for decision-makers and healthcare professionals in the European Union so that they can
more effectively promote the secondary use of health data and the acceptance thereof by citizens. Health data may
indeed contribute to health promotion, disease prevention, fostering healthy lifestyles and development of innovative,
efficient and sustainable health systems – as well as protecting EU citizens from serious cross-border health threats and
facilitating access to high quality, safe healthcare for EU citizens. WP8 will do so by identifying citizen perceptions and
attitudes on health data, ways of engaging citizens around their health data, defining data altruism practices in the EU,
as well as identifying key features, conditions and determinants of integrating health related data captured and shared
by individuals and data altruist organizations, in close alignment with the Data Governance Act. In order to achieve this
goal, WP8 has the following specific objectives:
O8.1 Obtain a better understanding of citizens' perception towards the sharing of their health data in a European
perspective.
O8.2 Improved citizen capacity to engage with data and improve citizen trust in data sharing: identify ways to better
inform citizens better about the use of their health data including data portability and raise awareness, sensitize around
innovation, and promote the role of citizens as actors of innovation. The design and implementation of this objective
will be underpinned by equality and diversity principles.
O8.3 Better understand tools of change management to empower citizens and enable them to become actors of health
data.
O8.4 Improve policymaking and facilitate decisions on which data generated and held by citizens can be used, how and
by whom for the public good and interest (scientific research, public health, sustainable healthcare systems) purposes
in a manner compliant with GDPR.
O8.5 Strengthen the health data governance mechanisms at the EU level and in the Member States and other participating
countries relevant for cross-sector data use and for data use in the common sectoral data spaces, by involving citizens, in
line with the FAIR principles considering the developments and decisions of other health sector-specific stakeholders,
authorities, agencies and care providers or researchers, as well as the input from other TEHDAS work packages (5,6
and 7).
Description of work and role of partners
WP8 - Citizens [Months: 1-24]
FR-HDH, Sitra, Sciensano, CHIF, MZCR, OKFŐ, MoH-NO, NHSC
Leads: FR-HDH, OKFŐ
Task 8.1 Preparatory phase of online consultation in three pilot countries
Task leader: FR-HDH, Partners: Sciensano, NHSC, FR-HDH (UT3), NHSC (WSI); Duration: M1-M10
Preparatory phase of online consultation in three pilot countries, including a pan-European qualitative assessment with
literature review and interviews on stakeholders’ and citizens’ perceptions of health data.
Task 8.2 Conduct online consultation to collect citizens’ perceptions
Task leader: Sciensano; Partners: FR-HDH, FR-HDH (UT3), NHSC, NHSC (WSI) Duration: M1-M17
Conduct online consultation to collect citizens’ perceptions on a set of health-data related affirmations and
questionnaires to be integrated with pedagogical material.
Task 8.3 Develop recommendations for the EHDS to ensure citizen sensitization and engagement with health data
Lead: FR-HDH, Partners: Sciensano, NHSC, NHSC (WSI), FR-HDH (UT3) Duration: M18 - M24
Conduct 1 workshop/ focus groups per country to discuss results and develop recommendations.
T8.4 Overview of national data altruism definitions and systems
Task leader: OKFŐ, Partners: Sitra, CHIF, MZCR, MoH-NO (Hdir), CHIF (CHIP), OKFŐ (SU); Duration M1-M7
Task 8.5 Recommend ways to foster GDPR-compliant data altruism mechanisms for the EHDS
Page 34 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Task leader: OKFŐ; Partners: Sitra, CHIF, NHSC, NHSC (WSI), CHIF (CHIP), OKFŐ (SU), MoH-NO; Duration M8-
M24
Participation per Partner
Partner number and short name WP8 effort
1 - Sitra 5.00
3 - Sciensano 17.50
4 - CHIF 2.80
CIPH 1.20
6 - MZCR 1.00
9 - FR-HDH 17.00
UT3 2.00
12 - OKFŐ 13.00
SU 10.00
19 - MoH-NO 0.00
Hdir 2.00
25 - NHSC 12.00
WSI 2.00
Total 85.50
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in
Number14
months)17
D8.1 Qualitative study
conducted amongst
key stakeholders (public,
D8.1 private actors, and 9 - FR-HDH Report Public 24
patient / citizen groups)
to assess citizen’s
perception of health data
D.8.2 Report on lessons
learned to be applied and
recommendations for
data altruism practices
D8.2 12 - OKFŐ Report Public 24
in the implementation of
construction of national
and European health data
spaces
Description of deliverables
D8.1 Qualitative study conducted amongst key stakeholders (public, private actors, and patient / citizen groups) to
assess citizen’s perception of health data (M24)
Page 35 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
D.8.2 Report on lessons learned to be applied and recommendations for data altruism practices in the implementation
of construction of national and European health data spaces (M24)
D8.1 : D8.1 Qualitative study conducted amongst key stakeholders (public, private actors, and patient / citizen
groups) to assess citizen’s perception of health data [24]
Qualitative study conducted amongst key stakeholders (public, private actors, and patient / citizen groups) to assess
citizen’s perception of health data
D8.2 : D.8.2 Report on lessons learned to be applied and recommendations for data altruism practices in the
implementation of construction of national and European health data spaces [24]
Report on lessons learned to be applied and recommendations for data altruism practices in the implementation of
construction of national and European health data spaces
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
M8.1 Literature review of
citizen’s perception of and
MS35 9 - FR-HDH 10
engagement with health data
in
M8.2 Publication of results
from comparative overview
of citizen’s perception of
MS36 3 - Sciensano 17
and engagement with health
data in selected countries:
Belgium, France, UK
M8.3 Publication of
recommendations the
European Health Data Space
MS37 9 - FR-HDH 24
to ensure citizen sensitization
and engagement with health
data
M8.4 Presentation of a
first set (catalogue) of data
M8.4 Presentation of a
altruism definitions, use
first set (catalogue) of data
cases and findings about
MS38 altruism definitions, use cases 12 - OKFŐ 7
consent and accessibility
and findings about consent
issues (means of verification:
and accessibility issues
catalogue approved by
stakeholders;)
M8.5 Publication of an
overview (prepared to launch
a communication campaign)
about the results of EU-
M8.5 Publication of an
wide multi stakeholder
overview about the results of
workshops, with a special
MS39 EU-wide multi stakeholder 12 - OKFŐ 15
regard to updated definitions,
workshops about data
needs, solutions, experiences,
altruism
and good practices of data
altruism (altruism structures
and functions) for the future
EHDS (means of verification:
Page 36 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
published in TEHDAS
webpage;)
M8.6 Recommendations to
M8.6 Recommendations to
foster GDPR-compliant data
foster GDPR-compliant data
MS40 12 - OKFŐ 16 altruism mechanisms for the
altruism mechanisms for the
EHDS (means of verification:
EHDS
report;)
Page 37 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
1.3.4. WT4 List of milestones
Due
Milestone WP
Milestone title Lead beneficiary Date (in Means of verification
number18 number9
months)17
MS1 M1.1 Grant Agreement WP1 1 - Sitra 3
M1.2 Consortium
MS2 WP1 1 - Sitra 3
Agreement
MS3 M1.3 PSO Agreement WP1 1 - Sitra 3
M1.4 Progress reports to
M1.4 Progress reports
MS4 WP1 1 - Sitra 5 General Assembly (M5, M15,
to General Assembly
M27)
M1.5 Stakeholder M1.5 Stakeholder Forums
MS5 WP1 1 - Sitra 9
Forums (M9, M16, M28)
M2.1 Open Call for
MS6 WP2 1 - Sitra 2
Stakeholders
M2.2 Quarterly newsletters
M2.2 Quarterly
MS7 WP2 1 - Sitra 3 (M3, M5, M8, M11, M14,
newsletters
M17, M20, M23)
M2.3 Stakeholder
M2.3 Stakeholder
MS8 WP2 1 - Sitra 12 consultations (M12, M16,
consultations
M18)
M2.4 Dissemination reports
M2.4 Dissemination
MS9 WP2 1 - Sitra 6 (M6, M12, M15, M18, M21,
reports
M24, M27)
M2.5 Dissemination M2.5 Dissemination activity
MS10 activity checks with WP2 1 - Sitra 3 checks with WPs (M3, M7,
WPs M11, M15, M19, M23)
M2.6 Stakeholder contact list
M2.6 Stakeholder
MS11 WP2 1 - Sitra 3 (M3, M5, M8, M11, M14,
contact list
M17, M20, M23, M29)
M2.7 Coverage metrics and
M2.7 Coverage metrics
MS12 WP2 1 - Sitra 3 follow-up (M2, M6, M10,
and follow-up
M14, M18, M22, M26, M30)
M3.1 Evaluation tools
MS13 WP3 20 - SPMS 9
and templates
M3.2 Draft interim
MS14 WP3 20 - SPMS 12
evaluation report
M3.3 Draft final
MS15 WP3 20 - SPMS 28
evaluation report
In close collaboration with
all WPs leaders a template
will be developed for the
M4.1 Template of country visit mapping tool.
MS16 mapping tool and WP4 3 - Sciensano 6 It will provide the key topics
Expressions of Interest that will be mapped through
the exercise and describe
the process for the country
visits. A call for expression
Page 38 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Due
Milestone WP
Milestone title Lead beneficiary Date (in Means of verification
number18 number9
months)17
of interest will be launched
to select countries for the
mapping exercise based on
the TEHDAS consortium.
M4.2 Policy and M4.2 Policy and Project
MS17 WP4 3 - Sciensano 4
Project Forum Forum (M4, M9, M16, M26)
M4.3 Mapping of the
MS18 existing infrastructures WP4 1 - Sitra 8
to build on
Identify and develop the
use cases to represent the
diversity of research user
groups across Europe. The
data collection will include
and compile information
M5.1 Use cases:
regarding user purposes,
MS19 Scientific research and WP5 3 - Sciensano 4
requirements, type of data
innovation
through an analysis of use
cases, previous relevant
studies, and stakeholder
consultation. This milestone
considers analysis of data on
a spectrum of identifiability.
Identify and develop the
use cases to represent the
diversity of policy makers
across Europe. The data
collection will include
and compile information
M5.2 Use cases: regarding purposes,
MS20 Policymaking for WP5 3 - Sciensano 5 requirements, type of
public health purposes data through an analysis
of relevant case studies,
previous relevant studies,
and stakeholder consultation.
This milestone considers
analysis of data on a spectrum
of identifiability.
M5.3 GDPR Data collection concluded and
interpretations in compiled regarding health
the secondary use of data access permitters and
MS21 health data in different WP5 9 - FR-HDH 6 providers in the different
member states and MS regarding GDPR
other participating interpretations based on the
countries use cases above.
M5.4 Description of
steps in accessing
individual-level
MS22 WP5 9 - FR-HDH 12
data for national
and EU researchers
in a selection of
Page 39 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Due
Milestone WP
Milestone title Lead beneficiary Date (in Means of verification
number18 number9
months)17
centralized systems and
decentralized systems
M5.5 Guideline
document for a peer-to-
peer and cross-border
MS23 WP5 9 - FR-HDH 12
partnership for the
secondary use of health
data
M5.6 Compilation
of best practices for
EU cross-border
exchange including
MS24 WP5 9 - FR-HDH 24
data access and data
permit processes in
different national
settings
M5.7 Analysis
of health specific
MS25 WP5 18 - VWS 5
governance aspects for
an EHDS
M5.8 Analysis of the
capacity of existing EU
structures and options
on how the governance
MS26 WP5 18 - VWS 7
aspects defined in M5.7
can be made within the
current structures or
with new structures
M6.1 Identification
of those features
that could be legally
MS27 WP6 7 - RM 9
bound and provide
advice to the European
Commission
M6.2 Identification
of relevant encoding
MS28 standards and data WP6 23 - IACS 12
models for semantic
harmonization
M7.1 Technical and
operational analysis
report of existing
MS29 data sharing and/ WP7 1 - Sitra 8 Task Lead: Sitra (CSC)
or secondary use
initiatives in health and
biomedical sciences.
M7.2 Report on
MS30 EHDS services users’ WP7 1 - Sitra 9 Task Lead: Sitra (VTT)
expectations.
Page 40 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Due
Milestone WP
Milestone title Lead beneficiary Date (in Means of verification
number18 number9
months)17
M7.3 Report on
EHDS architecture
and infrastructure
MS31 WP7 1 - Sitra 16 Task Lead: Sitra (VTT)
implementers’
expectations /
experiences.
M7.4 Validation
report on the
MS32 proposed services WP7 1 - Sitra 22 Task lead: Sitra (VTT)
and architecture and
infrastructure solutions.
M7.5 Catalogue of
the EHDS services for
MS33 WP7 23 - IACS 10
secondary use of health
data.
M7.6 Report on
architecture and
infrastructure options to
MS34 WP7 23 - IACS 22
support EHDS services
for secondary use of
data.
M8.1 Literature review
of citizen’s perception
MS35 WP8 9 - FR-HDH 10
of and engagement
with health data in
M8.2 Publication
of results from
comparative overview
of citizen’s perception
MS36 WP8 3 - Sciensano 17
of and engagement
with health data in
selected countries:
Belgium, France, UK
M8.3 Publication of
recommendations
the European Health
MS37 Data Space to ensure WP8 9 - FR-HDH 24
citizen sensitization and
engagement with health
data
M8.4 Presentation of a
M8.4 Presentation of
first set (catalogue) of data
a first set (catalogue)
altruism definitions, use
of data altruism
cases and findings about
MS38 definitions, use WP8 12 - OKFŐ 7
consent and accessibility
cases and findings
issues (means of verification:
about consent and
catalogue approved by
accessibility issues
stakeholders;)
M8.5 Publication of M8.5 Publication of an
MS39 WP8 12 - OKFŐ 15
an overview about overview (prepared to launch
Page 41 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Due
Milestone WP
Milestone title Lead beneficiary Date (in Means of verification
number18 number9
months)17
a communication campaign)
about the results of EU-
wide multi stakeholder
workshops, with a special
the results of EU- regard to updated definitions,
wide multi stakeholder needs, solutions, experiences,
workshops about data and good practices of data
altruism altruism (altruism structures
and functions) for the future
EHDS (means of verification:
published in TEHDAS
webpage;)
M8.6
M8.6 Recommendations to
Recommendations
foster GDPR-compliant data
to foster GDPR-
MS40 WP8 12 - OKFŐ 16 altruism mechanisms for the
compliant data altruism
EHDS (means of verification:
mechanisms for the
report;)
EHDS
Page 42 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
1.3.5. WT5 Critical Implementation risks and mitigation actions
Risk
Description of risk WP Number Proposed risk-mitigation measures
number
Effective coordination is ensured by the well-
WP1, WP2, WP3, WP4,
1 Ineffective coordination thought managerial structure and transparent
WP5, WP6, WP7, WP8
procedures.
Ineffective overall Effective management is ensured through good
2 WP1
management PMO office services.
All partners are experienced and motivated to
reach the project objectives. The management
structure is clear, the project deliverables include
Project Management Plan, Risk Management
WP1, WP2, WP3, WP4,
3 Conflicts in the Consortium Plan, and the Dissemination Plan.The Consortium
WP5, WP6, WP7, WP8
Agreement will be comprehensive. Decreasing
R1 and R2 decreases R3. Project partners are
experienced with virtual collaboration and
meetings, effective documenting and sharing.
Ineffective collaboration WP1, WP2, WP3, WP4, Project Steering group meets regularly to mitigate
4
between WPs WP5, WP6, WP7, WP8 this risk.
The coordinator, WP leaders and Task leaders will
Coordination problems WP1, WP2, WP3, WP4,
5 monitor progress and flag problems early enough
within an individual WP WP5, WP6, WP7, WP8
to enable fast mitigation.
Planning within Work Packages has distributed
WP1, WP2, WP3, WP4,
6 Delays with deliverables deliverables along the project lifecycle. Strong
WP5, WP6, WP7, WP8
project management in place.
Subcontracting is in a small role in this
Problems with
7 WP2, WP5, WP8 project. Partners have extensive experience in
subcontracting
subcontracting.
WP1, WP2, WP3, WP4, Reduce: Continuous monitoring of budgeted and
8 Budget overspending
WP5, WP6, WP7, WP8 actual costs.
Change of key staff in the Accept: With 8 WPs it is expected that some
WP1, WP2, WP3, WP4,
9 coordination, WP, and Task exchange of persons will take place. Each CA is
WP5, WP6, WP7, WP8
leaders. advised to make contingency plans for their staff
Accept: New EU regulation is already in process
Change of requirements for for data spaces. WPs are advices to make
deliverables due external WP1, WP2, WP3, WP4, description of deliverables enough generic so that
10
events such as new EU laws, WP5, WP6, WP7, WP8 there is a room for change during the project. If
budgets changes or similar the risk materializes severely changes in contracts
might be needed.
Reduce: One of the main target groups (EC) is
consulted during the planning phase to mitigate
The deliverables will not
WP1, WP2, WP3, WP4, the risk. Participants and their experience are
11 meet the needs of the target
WP5, WP6, WP7, WP8 expected to mitigate this risk towards other
groups
target groups that cannot be consulted during the
planning phase.
WP4 aims to include external parties early on
into the project to assure their involvement,
Lack of consensus with and WP1, WP2, WP3, WP4,
12 strengthening communication and collaboration
between stakeholders WP5, WP6, WP7, WP8
which facilitates consensus. Further discussion
and consensus building happens through the
Page 43 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Risk
Description of risk WP Number Proposed risk-mitigation measures
number
stakeholder forum and WPAGs. Adopting
dialogue methods in communication. Active
stakeholder engagement. Participatory meetings.
Clear communication eg. not using abbreviations.
Page 44 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
1.3.6. WT6 Summary of project effort in person-months
Total Person/Months
WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8
per Participant
1 - Sitra 50 23 0 8 1 0 0 5 87
· VTT 0 0 0 0 0 0 10 0 10
· THL 0 0 0 0 3 7 0 0 10
· CSC 0 0 0 0 0 0 9 0 9
2 - ATNA 0 0 0 0 2 2 3 0 7
3 - Sciensano 0 0 0 29 8 2 5 17.50 61.50
4 - CHIF 0 0 0 0 1.20 0 0 2.80 4
· CIPH 0 0 0 0 1.80 0 0 1.20 3
5 - MoH-CY 0 0 0 0 0 0 0 0 0
6 - MZCR 0 0 0 3 4 1 2 1 11
7 - RM 0 0 0 0 3 12 2 0 17
· CDEU 0 0 0 0 1 1 1 0 3
8 - MoSA 0 0 0 0 0 0 0 0 0
9 - FR-HDH 0 0 0 0 4.75 1.75 4 17 27.50
· UT3 0 0 0 0 2 0 0 2 4
· AMU 0 0 0 0 0 3 0 0 3
· Inserm 0 0 0 0 4 4 0 0 8
· HCL 0 0 0 0 0 1.50 0 0 1.50
· ANS 0 0 0 0 0.25 0.25 0 0 0.50
10 - BMG 0 0 0 0 0 0 0 0 0
· FDZ 0 0 0 0 0 0 0 0 0
· GEMATIK 0 0 0 0 0 0 0 0 0
11 - 6th Y. PE. 0 0 0 0 2 0 0 0 2
Page 45 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Total Person/Months
WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8
per Participant
12 - OKFŐ 0 0 0 2 2 2 3 13 22
· SU 0 0 0 2 3 2 2 10 19
13 - DoH-IE 0 0 0 0 0 0 0 0 0
· HRB 0 0 0 0 0 0 0 0 0
14 - MINSAL 0 0 0 0 3 4 3 0 10
15 - SAM-LT 0 0 0 0 4 0 0 0 4
16 - DHIR 0 0 0 5 2 0 0 0 7
17 - ATRM 0 0 0 0 0 0 0 0 0
18 - VWS 0 0 0 0 15 0 0 0 15
· Nictiz 0 0 0 0 0 2 0 0 2
19 - MoH-NO 0 0 0 0 1 0 0 0 1
· E-helse 0 0 0 0 0 2 0 0 2
· FHI 0 0 0 0 2 0 0 0 2
· Hdir 0 0 0 0 0 2 0 2 4
20 - SPMS 0 0 11 0 6 7 8 0 32
21 - IPHS "Batut" 0 0 0 1 1 0 0 0 2
22 - NIJZ 0 0 0 5 4 0 0 0 9
23 - IACS 0 0 0 0 8 30.75 45.50 0 84.25
24 - SEHA 0 0 0 2 16 2 1 0 21
· PHAS 0 0 0 2 0 0 0 0 2
· NBHW 0 0 0 0 0 0 2 0 2
25 - NHSC 0 0 0 0 3 0 0 12 15
· WSI 0 0 0 0 1 0 0 2 3
Total Person/Months 50 23 11 59 109 89.25 100.50 85.50 527.25
Page 46 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
1.3.7. WT7 Tentative schedule of project reviews
Review Tentative Planned venue
Comments, if any
number 19 timing of review
RV1 15
RV2 30
Page 47 of 47
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
1. Project number
The project number has been assigned by the Commission as the unique identifier for your project. It cannot be
changed. The project number should appear on each page of the grant agreement preparation documents (part A
and part B) to prevent errors during its handling.
2. Project acronym
Use the project acronym as given in the submitted proposal. It can generally not be changed. The same acronym should
appear on each page of the grant agreement preparation documents (part A and part B) to prevent errors during its
handling.
3. Project title
Use the title (preferably no longer than 200 characters) as indicated in the submitted proposal. Minor corrections are
possible if agreed during the preparation of the grant agreement.
4. Starting date
Unless a specific (fixed) starting date is duly justified and agreed upon during the preparation of the Grant Agreement,
the project will start on the first day of the month following the entry into force of the Grant Agreement (NB : entry into
force = signature by the Agency). Please note that if a fixed starting date is used, you will be required to provide a written
justification.
5. Duration
Insert the duration of the project in full months.
6. Call (part) identifier
The Call (part) identifier is the reference number given in the call or part of the call you were addressing, as indicated
in the publication of the call in the Official Journal of the European Union. You have to use the identifier given by the
Commission in the letter inviting to prepare the grant agreement.
7. Abstract
8. Project Entry Month
The month at which the participant joined the consortium, month 1 marking the start date of the project, and all other start
dates being relative to this start date.
9. Work Package number
Work package number: WP1, WP2, WP3, ..., WPn
10. Lead beneficiary
This must be one of the beneficiaries in the grant (not a third party) - Number of the beneficiary leading the work in this
work package
11. Person-months per work package
The total number of person-months allocated to each work package.
12. Start month
Relative start date for the work in the specific work packages, month 1 marking the start date of the project, and all other
start dates being relative to this start date.
13. End month
Relative end date, month 1 marking the start date of the project, and all end dates being relative to this start date.
14. Deliverable number
Deliverable numbers: D1 - Dn
15. Type
Please indicate the type of the deliverable using one of the following codes:
R Document, report
DEM Demonstrator, pilot, prototype
DEC Websites, patent fillings, videos, etc.
OTHER
ETHICS Ethics requirement
ORDP Open Research Data Pilot
DATA data sets, microdata, etc.
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
16. Dissemination level
Please indicate the dissemination level using one of the following codes:
PU Public
CO Confidential, only for members of the consortium (including the Commission Services)
EU-RES Classified Information: RESTREINT UE (Commission Decision 2005/444/EC)
EU-CON Classified Information: CONFIDENTIEL UE (Commission Decision 2005/444/EC)
EU-SEC Classified Information: SECRET UE (Commission Decision 2005/444/EC)
17. Delivery date for Deliverable
Month in which the deliverables will be available, month 1 marking the start date of the project, and all delivery dates
being relative to this start date.
18. Milestone number
Milestone number:MS1, MS2, ..., MSn
19. Review number
Review number: RV1, RV2, ..., RVn
20. Installation Number
Number progressively the installations of a same infrastructure. An installation is a part of an infrastructure that could be
used independently from the rest.
21. Installation country
Code of the country where the installation is located or IO if the access provider (the beneficiary or linked third party) is
an international organization, an ERIC or a similar legal entity.
22. Type of access
TA-uc if trans-national access with access costs declared on the basis of unit cost,
TA-ac if trans-national access with access costs declared as actual costs, and
TA-cb if trans-national access with access costs declared as a combination of actual costs and costs on the basis of
unit cost,
VA-uc if virtual access with access costs declared on the basis of unit cost,
VA-ac if virtual access with access costs declared as actual costs, and
VA-cb if virtual access with access costs declared as a combination of actual costs and costs on the basis of unit
cost.
23. Access costs
Cost of the access provided under the project. For virtual access fill only the second column. For trans-national access
fill one of the two columns or both according to the way access costs are declared. Trans-national access costs on the
basis of unit cost will result from the unit cost by the quantity of access to be provided.
Ref. Ares(2021)3802411 - 10/06/2021
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Joint Action Towards the European Health Data Space
TEHDAS
Proposal ID 101035467
Project Plan
Coordinated by:
Finnish Innovation Fund Sitra
3rd EU Health Programme
Date:
2021-06-09 1 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
This template is aligned with the Open PM² Methodology of the European Commission.
TABLE OF CONTENTS
List of Applicants .................................................................................................................................................... 3
1 PROBLEM ANALYSIS INCLUDING EVIDENCE BASE .............................................................................................. 4
2 GOALS AND OBJECTIVES OF THE PROJECT ......................................................................................................... 8
2.1 General Objectives of the Project .................................................................................................................... 8
2.2 Specific Objectives of the Project .................................................................................................................... 9
3 STAKEHOLDER - TARGET GROUPS ................................................................................................................... 14
4 POLITICAL RELEVANCE ..................................................................................................................................... 15
4.1 Contribution to the Annual Work Plan .......................................................................................................... 15
4.2 Added Value ................................................................................................................................................... 16
4.3 Pertinence of Geographic Coverage .............................................................................................................. 17
4.4 Context of the project work ........................................................................................................................... 18
5 METHODS AND MEANS ................................................................................................................................... 18
6 EXPECTED OUTCOMES ..................................................................................................................................... 19
7 WORK PACKAGES ............................................................................................................................................ 21
7.1 Overview of Work Packages (WPs) ................................................................................................................ 21
7.2 Work Packages (WP) Description ................................................................................................................... 21
7.3 Timetable and Milestones ............................................................................................................................. 51
8 DELIVERABLES ................................................................................................................................................. 54
9 PROJECT MANAGEMENT ................................................................................................................................. 56
9.1 Methods ......................................................................................................................................................... 56
9.2 Governance, Roles, Responsibilities .............................................................................................................. 57
9.3 Processes & Artefacts .................................................................................................................................... 59
9.4 Quality & Capacity of the Partnership ........................................................................................................... 60
9.5 Capacity of the staff to carry out the project................................................................................................. 61
9.6 Risk Analysis and Treatment .......................................................................................................................... 64
9.7 Financial management ................................................................................................................................... 65
10 BUDGET ......................................................................................................................................................... 66
10.1 Content description and justification .......................................................................................................... 66
10.2 Summary of Effort ........................................................................................................................................ 68
10.3 Third-Party Contributions ............................................................................................................................ 69
10.4 Detailed Budget ........................................................................................................................................... 69
11 PREVIOUS AND CURRENT GRANTS RELEVANT TO THE PROGRAMME ............................................................ 97
12 CURRENT APPLICATIONS RELEVANT TO THE PROGRAMME ........................................................................... 97
13 EXCEPTIONAL UTILITY.................................................................................................................................... 97
14 COLLABORATING STAKEHOLDERS ................................................................................................................. 97
Date:
2021-06-09 2 / 82
Doc Version: 1.0
List of Applicants Associated with document Ref. Ares(2021)4548885 - 13/07/2021
# Applicant Organisation Name Acronym Country
1 Suomen itsenäisyyden juhlarahasto / Finnish Innovation Fund Sitra Sitra Finland
2 Bundesministerium für Soziales, Gesundheit, Pflege und ATNA Austria
Konsumentenschutz
3 Sciensano Sciensano Belgium
4 Hrvatski zavod za zdravstveno osiguranje / Croatian Health Insurance CHIF Croatia
Fund
5 Ministry of Health of the Republic of Cyprus MoH-CY Cyprus
6 Ministerstvo zdravotnictvi Ceske republiky MZCR Czechia
7 Region Midtjylland RM Denmark
8 Sotsiaalministeerium / Ministry of Social Affairs MoSA Estonia
9 Plateforme des données de santé / Health Data Hub FR-HDH France
10 Bundesministerium für Gesundheit BMG Germany
11 Dioikisi 6is Ygeionomikis Perifereias Peloponnisou Ionion Nyson 6th Y. PE. Greece
Ipeirou Kai Dytikis Ellades/ Regional 6th Health Administration of
Peloponnese - Ionian Islands Epirus & Western Greece
12 Országos Kórházi Főigazgatóság / National Healthcare Service Center OKFŐ Hungary
13 Department of Health DoH-IE Ireland
14 Ministero della Salute MINSAL Italy
15 Lietuvos Resbublikos Sveikatos Apsaugos Ministerija / Ministry of SAM-LT Lithuania
Health of the Republic of Lithuania
16 Ministry for Health – Government of Malta, Directorate Health DHIR Malta
Information and Research
17 Agentia de Transplant / Transplant Agency of the Republic of ATRM Moldova
Moldova
18 Ministerie van Volksgezondheid, Welzijn en Sport / Ministry of Health, VWS Netherlands
Welfare and Sports, Directorate Information Policy
19 E-helseavdelningen / The Norwegian Ministry of Health and Care MoH-NO Norway
Services
20 SPMS – Serviços Partilhados do Ministério da Saúde Epe / Shared SPMS Portugal
Services of the Ministry of Health, EPE
21 Institute za Zastitu Zoravlja Srbijedr Milan Jovanovic Batut / Institute IPHS Serbia
of Public Health of Republic of Serbia "Dr Milan Jovanovic Batut" “Batut”
22 Nacionalni Institut za Javno Zdravje / National Institute of Public NIJZ Slovenia
Health
23 Instituto Aragonés de Ciencias de la Salud IACS Spain
Date:
2021-06-09 3 / 82
Doc Version: 1.0
24 E-hälsomyndigheten / Swedish eHealth Agency SEHA
Associated with document Ref. Ares(2021)4548885 Sweden
- 13/07/2021
25 The NHS Confederation NHSC UK
Date:
2021-06-09 4 / 82
Doc Version: 1.0
Joint Action Towards the European Health Data Space (TEHDAS) Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Responses to the comments of the European Commission, 9th June 2021
Comment of the European Commission TEHDAS Response Reference to
Chapter in the
proposal
Please request affiliated entity WSI to submit a high quality copy/scan of its A better-quality copy of the signed DoH of WSI received from WSI and sent to
signed DoH – the one which has been submitted is incomplete and illegible. HaDEA.
Since the consortium composition changed as compared to the proposal BG withdrew because of lack of resources due to Covid pandemic. The budget was Chapter 10
(former beneficiary 4 Bulgarian Ministry of Health withdrew), please briefly reallocated to coordination (Sitra - FI): Other goods and services 3000,00 euros
explain/outline the reasoning, and to which beneficiaries its budget was and communication subcontracting 3000,00 euros. Both budget lines support the
reallocated. whole project. In Other goods and services the budget is used for General
Assembly meeting and in Communication the additional budget is used for
tehdas.eu website maintenance.
Table 6 of Section 10.1 - please verify and correct the ‘total funding’ figure Corrected. Chapter 10. Table 6
of EUR 4 166 131.67, it should be EUR 4 166 666.67. of Section 10.1
Table 7 of Section 10.1 - the amount of PMs for WP4 that has been entered There was one PM missing for OKFÖ affiliated entity SU. The Project Plan Person Chapter 10. Table 7
in the system/Annex 1 Part A (58 PMs) does not correspond to the PM Months were correct. The correct PM total is 527.25. It was a typing error. of Section 10.1
figure stated in the table (59 PMs). Therefore, also the overall PM figure in
the system (526.25 PMs) doesn’t correspond to the total PM figure stated in
the table (527.25 PMs) – please verify and correct where appropriate.
Table 9 of Section 10.2 - the PM figures in the table do not correspond to This is due to the same typing error in portal. This has been corrected. The correct Chapter 10. Table 9
those in the system (e.g. the total number of PMs in Annex 1 Part B is number is 527.25. of Section 10.2
527.25, while in the system/ the total number of PMs is 526.25).
The total subcontracting amount mentioned on p.58 (EUR 180 000) does not This error was due to BG withdrawal from the project and the reallocation of their Chapter 10.
correspond to the total subcontracting figure stated in Annex 2 (EUR 183 budget to the coordination team. The error has been corrected.
000) and in other parts of the project plan – please verify and correct where
appropriate.
On p.59 you state that ‘There are no known potential conflicts of interests No third-party contributions. Corrected to “N/A”. Chapter 10, Section
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
in case of third-party contributions’ – please clarify whether you will be 10.3.
receiving any third-party contributions and clearly identify any such
contributions.
Please clarify which entities will provide in-kind contributions (we These countries and organisations have not requested Person Months in the Chapter 10
understand that MoSA, BMG, GEMATIK, FDZ, DoH-IE, HRB, ATRM are project. Their travel expenses have been included. None of their in-kind
concerned), and please also confirm that none of the in-kind contributions contribution has been included in the budget.
have been included in the estimated budget.
Comments regarding the detailed budget – Section 10.4: In the chapter 10.1. in section Other costs we argue that due to Covid pandemic Chapter 10. Section
• travel costs: the travelling budget has been limited. “At minimum, each participating 10.4
for each beneficiary/ affiliated entity budgeting travel costs, please make organization receives 6.000,00 euros travelling budget. That is calculated to
sure to clarify the following: number of persons travelling, number of days, include three yearly general assembly meetings and additional face-to-face
the type and number of events/meetings, and ideally also the destination workshop, altogether 6 meetings with 1.000,00 estimated costs each. Work
(e.g. 2 persons travelling for 3 days to workshop XYZ in Brussels) - it is not Package leaders have additional travelling costs, and the coordinator is expected
sufficient to state ‘additional travel from WP4 and country visits’/ ‘6
to have the most travelling during the project.”
additional meetings as a WP leader’ / ‘3 face-to-face workshops’ /
‘Additional travelling added because of multiple persons involved without It is difficult to estimate travelling, but WP leaders are expected to have face-toface
contribution budget’ etc. Project Steering Group meetings. So far, all such meetings has been virtual. Also
workshops have all been virtual. We have estimated that also face-to-face
workshop will be held, but at the moment it is unclear when and where due to the
pandemic.
Comments regarding the detailed budget – Section 10.4: We have added that the expertise is in health data. Chapter 10. Section
• function descriptions: most beneficiaries/affiliated entities use function 10.4
names such as ‘expert’/ ‘junior expert’/ ‘senior expert’/ ‘senior lead expert’/
‘expert level’ – in each case please provide a few more details on the
function name/description (e.g. expert in the field of…/ expert on…).
Comments regarding the detailed budget – Section 10.4: BG withdrew from the project in March at a time when Associated
WP2 had started working
with document Chapter 10. Section
Ref. Ares(2021)4548885 - 13/07/2021
• Subcontracting: on the communication. All subcontracting from Sitra is planned for WP2. The 10.4
Sitra: please clarify why the subcontracting costs increased by EUR 3000 as creation of the website and further development of it throughout the project
compared to the proposal; Sitra also states that ‘graphic design to create clearly benefitted from the additional 3000,00 euros left from BG. Also the budget
leaflet as well as final report and media reach surveillance will be used for website and communication that serves all WPs was considered equal
subcontracted’ – please bear in mind that the final report must be prepared distribution of the additional budget. We removed mention of final report from
by the coordinator and the other beneficiaries together, since coordination here. It was not planned to subcontract coordination tasks.
tasks cannot be subcontracted; therefore please adapt the text accordingly.
Comments regarding the detailed budget – Section 10.4: This question was asked in the evaluation process and already answered at that Chapter 10. Section
• Subcontracting: time. In WP5 T5.4. the current description is the following: “Task 5.4 is expected 10.4
FR-HDH, VWS, SEHA: these beneficiaries have included ‘legal services/ legal to involve external experts in the field of legal services for specific and focused EU
expertise’ under subcontracting costs – since normally this type of expertise law problems for which in-house legal advice cannot be found.” during the spring
should be found in-house, please clarify what exactly is covered under ‘legal subcontracting for legal advice was used to review a M5.7. document. The actual
services/expertise’ in each case, and how it will be of added value to the document was written by experts in TEHDAS project. The subcontracting was used
relevant tasks. to find potential problems from the text.
Comments regarding the detailed budget – Section 10.4: We copied the description to the budget table. Chapter 10. Section
• Other direct costs: 10.4
Sciensano: please briefly clarify what is covered under ‘Policy and project
forums meetings’ – are these the costs of organising/conducting the
meetings? What kind of meetings are these and how many will be
organised? (it is mentioned in the project plan, but not clarified/specified in
the budget section).
Comments regarding the detailed budget – Section 10.4: Yes. They are costs from organising the workshops. FR-HDH is a task lead in Task Chapter 10. Section
• Other direct costs: 5.3. which includes four partners. There is estimated one workshop between those 10.4
FR-HDH: please briefly clarify what is covered under ‘Workshops in Task 5.3 partners. In the WP8 FR-HDH is a WP leader and for 8.1. one workshop has been
and in WP8, specifically 8.1’ – are these the costs of organising/conducting planned. Each workshop is estimated 2.500,00 euros.
the workshops? What kind of workshops are these and how many will be
organised?
Comments regarding the detailed budget – Section 10.4: SU is an affiliated entity of OKFÖ which is the WP8 leader. Workshops are planned Chapter 10. Section
• Other direct costs: to build deliverables for T8.4 and T8.5. Two workshops have been planned for both 10.4
SU: please briefly clarify what is covered under ‘WP8 Workshops’ – are these with 2.500,00 euros budget for each.
the costs of organising/conducting the workshops? What kind of workshops
are these and how many will be organised?
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Comments regarding the detailed budget – Section 10.4: Yes. The costs are for organising the workshops. IACS is leading WP7 and WP6. The Chapter 10. Section
• Other direct costs: workshops build deliverables of both Work packages. Each WP has a budget of 10.4
IACS: please briefly clarify what is covered under ‘Workshops in WP6 and 7.500,00 euros and planned to have three workshops with a budget of 2.500,00
WP7’ – are these the costs of organising/conducting the workshops? What euros each.
kind of workshops are these and how many will be organised?
Comments regarding the detailed budget – Section 10.4: Yes. The costs are for organising the workshops. SEHA is leading WP5 and with their Chapter 10. Section
• Other direct costs: budget two workshops of 2.500,00 euros each has been planned. 10.4
SEHA: please briefly clarify what is covered under ‘WP5 workshops’ – are
these the costs of organising/conducting the workshops? What kind of
workshops are these and how many will be organised?
Comments regarding the detailed budget – Section 10.4: MoSA is the abbreviation for Estonia’s Competent Authority (CA) used in the Chapter 10. Section
• various inconsistencies: TEHDAS project, its English acronyme. In the organisational profile of the Estonian 10.4
MoSA: please clarify who is is ‘EE’ CA in the EC portal its official name (i.e. from the registered organisational profile
with PIC) is “Sotsiaalministeerium – MSAE” and EE is the country code. Extra
acronyms are now taken away.
Comments regarding the detailed budget – Section 10.4: Corrected. We removed the 0,50 PM from GEMATIK. Chapter 10. Section
• various inconsistencies: 10.4
GEMATIK: the table states that it ‘GEMATIK will contribute to task 6.2 with
0.50 PM’ – however this 0,5 PM has not been recorded in the system, please
verify and correct where appropriate.
Comments regarding the detailed budget – Section 10.4: Corrected. We removed the 0,50 from FDZ. Chapter 10. Section
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
• various inconsistencies: 10.4
FDZ: the table states that it ‘FDZ will contribute to task 7.4 with 0,50 PM’ –
however this 0.5 PM has not been recorded in the system, please verify and
correct where appropriate.
Comments regarding the detailed budget – Section 10.4: Corrected. 19 is correct. We have corrected the number in the system. Chapter 10. Section
• various inconsistencies: 10.4
SU: the table mentions 19 PMs, but the system states 18 PMs – please verify
and correct where appropriate.
Comments regarding the detailed budget – Section 10.4: Corrected. We removed the 3,5 PMs from DoH-IE. Chapter 10. Section
• various inconsistencies: 10.4
DoH-IE: the table mentions 3.5 PMs, but the system states zero PMs – please
verify and correct where appropriate.
Comments regarding the detailed budget – Section 10.4: Corrected. We removed the 3,5 PMs from HRB. Chapter 10. Section
• various inconsistencies: 10.4
HRB: the table states 3.5 PMs, but the system states zero PMs – please verify
and correct where appropriate.
Comments regarding the detailed budget – Section 10.4: Corrected. We removed the 1,5 PMs from ATRM. Chapter 10. Section
• various inconsistencies: 10.4
ATRM: the table states 1.5 PMs, but the system states zero PMs – please
verify and correct where appropriate.
Comments regarding the detailed budget – Section 10.4: Corrected to Director. Chapter 10. Section
• various inconsistencies: 10.4
SPMS: please clarify what is meant by the ‘Directorate’ staff function
Please verify whether beneficiaries Sitra, Sciensano, and IACS will need to Sitra, Sciensano and IACS need to submit CFS according to the Grant Agreement. Chapter 10.
submit a certificate on financial statements (CFS) and if so, please make sure We have modified the Other goods and services of Sitra, Sciensano and IACS to
they budget the CFS and mention it in the detailed budget under ‘Other include CFS costs.
direct costs’.
Comments regarding the detailed budget – Section 10.4: Corrected. Associated with document Ref. Ares(2021)4548885 - 13/07/2021
• various inconsistencies:
Please refer to ‘HaDEA’ instead of ‘Chafea’ where appropriate.
Any changes to names of partners could also be corrected now. Corrected.
Please make sure to reflect all changes and the justifications in the History of This table. Done.
Changes.
Joint Action Towards the European Health Data Space (TEHDAS) Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Responses to the comments in the Evaluation Summary Report and the explanation of changes made
Comment in the Evaluation Summary Report ESR TEHDAS Response Reference to
Chapter in the
proposal
Criterion 1 – Contribution to public health in Europe
1/ It does not provide sufficient details with regard to the specific public The General Objective in Chapter 2 has been edited to express that the Joint Chapter 2
health goals this use [of secondary data] would aim to achieve, and what Action addresses the secondary use of health data. The proposals will not limited
level of secondary data will be the focus of the action. to specific use cases or types secondary use. Further, the text underlines that the
secondary use benefits a wide range of public health goals.
2/ The proposal does not discuss in sufficient details the legislative, Chapter 1 describes the problematics to be solved on the European, Member Chapter 1
organizational, and semantic or ICT options despite evidence showing that States and regional level to share the data and to achieve added value with
these can be used to generate, manage and share valuable data and sharing data. Longg-term impacts and outcomes are discussed in Chapter 6.
information effectively and at reasonable cost. Effectivity and cost effects are hard to evaluate at this stage when the final legal,
organisational and management solutions and models are open and can evaluated
when these solutions are developed by the project.
3/ It also does not adequately highlight the key issues regarding different A short reference to key issues in secondary use of health data in countries in Chapter 1, 5, WP4
stages of development and disparities between health systems in different different stages of development and having health systems in different countries
countries, whether or how these may affect the implementation of this JA is included in Chapter 1. A reference, which underlines the need to take the issue
and how these differences will be mitigated to ensure the achievement of into account in TEHDAS, is added to Chapter 5 and WP4.
the intended results.
Criterion 2 – Technical quality
4/ The evidence on current trends in secondary data is limited and linkages Current status and trends for secondary use of data are described in Chapter 1. Chapter 1
between the state-of-the art in secondary data sharing models and the The project will develop and describe more the options for the future models of
proposal are insufficiently developed. data-sharing in Europe and between the countries and regions, in particular in
WP5, WP6 and WP7.
5/ There are limited details on whether and how this JA will build upon Most of these projects were already mentioned Chapter 5 andwith
Associated 11.document
For those Chapters 5 and 11,
Ref. Ares(2021)4548885 - 13/07/2021
existing initiatives or complement them. In particular, links with very projects, their results relevant to TEHDAS will be described early on in WP4. The WP4
relevant actions such as Infact, BRIDGE, PARENT, JASEHN, eHAction, eHDSI, coordination work will continue in the technical project forum under WP4 and the
have not been discussed in sufficient details. The lack of these linkages and TEHDAS consortium includes many partners, who have been involved in those
discussion raises concerns on the risk of duplication of existing efforts. projects ensuring the knowledge transfer.
6/ It is not sufficiently clear how the JA will achieve the expected outcomes Chapter 6 is modified to show more clearly which outcomes flow directly from Chapter 6
listed in Chapter 6, particularly as it does not explicitly propose means to TEHDAS, and which outcomes may follow from the wider secondary data use if the
measure progress towards such achievements. Joint Action’s proposals are adopted.
7/ Methods and means are described in a general manner, with limited The text is edited to include a specific reference to the relevant Work Packages. Chapter 5
specific references to the tasks and activities included in the WPs.
8a/ The WPs generally lack clear and detailed elaborations of activities, and Work Package descriptions have been checked and adjustments made, e.g., Chapter 7.2
the link between tasks and associated milestones/deliverables is often concerning T5.3, D5.2, M5.3 and WP7 (underlining sub-tasks and their division of
insufficiently developed (e.g. missing link between task 5.2 and D5.2; lack of work). Further, all Work Packages will produce a more detailed work plan at the
clear corresponding activities leading to M5.5, M5.7 and M5.8 etc.). beginning of the project (M01) as a part of the project management, to be
endorsed by the PSG.
8b/ Methods, selection criteria and processes to achieve important results Task T5.4 has been revised to describe more clearly the process to arrive at D5.3 Chapter 7.2.
such as the ‘recommendations for best practices’ (D5.3) or ‘ the and D5.4.
wellestablished options for governance models’ (D 5.4) are not explicitly
spelled out.
9/ Further, it is not sufficiently clear how the countries selected as sources The text has been clarified to show that the four countries represent different ways Chapter 7.2 WP5
of best practices (FIN, FR, NL, ES) will provide a realistic and representative of implementing the secondary use of health data. As the aim is to describe and
status of health systems in the whole of Europe. test good practice, the participating countries must be moderately developed and
willing to work on the topic. A sentence has been added to underline that the
outcome recommendations need to realistic to implemented in different
situations across Europe.
10a/ The logical sequence between process, outputs and outcomes indicators The background and a graph for the intervention logic has been added to Chapter Chapter 2.2
is not always fully consistent, 2.2.
10b/ the rationale for some indicators is not always clear and some outcome The rational and wording for indicators has been reviewed and with
Associated adjusted when
document Chapter 2.2 (and - 13/07/2021
Ref. Ares(2021)4548885
indicators needs restructuring as, in their current formulation, they do not necessary. The details of their practical follow-up will be elaborated in the internal 7.2 work packages)
measure impact; e.g regarding consistency, for O5 the process indicator evaluation plan MD3.1.
’number of country visits ..’ sets a target value of 8, the corresponding
output indicator ‘factsheets’ sets a target of 10; the outcome indicator
'number of stakeholders involved in country visits' sets a target of 4.
Outcome indicators chosen for O1 do not appear to measure the
achievement of ‘options for an operational framework and governance
models‘.
11/ Details regarding the tailoring of interventions, e.g. hospital or Chapter 2.2 has been clarified to show that the main focus of the Joint Action is on Chapter 2.2
territorial/home/residential care are not clearly spelled out. cross-border use of data and any necessary national linkages, not data use at
service provider level.
12/ Insufficient justification is provided as per why the partner tasked with The text for WP3 in Chapter 7.2 was modified to provide a clarification on the issue Chapter 7.2 WP3
evaluation is also involved in other project activities, including QA of raised by the ESR report. WP 3 deals with the project’s internal evaluation and, as
deliverables (resulting in this partner evaluating some of its own work), The such, is coordinated by one of project partners; this ensures sufficient knowledge
plan to deliver the end-of-project evaluation report six months before the of the JA to ensure an adequate evaluation plan. The evaluation rational and design
end of the project is also not sufficiently justified. will describe how the evaluation activities will be carried out and how the selected
indicators will be measured. The text in WP3 is updated to underline that
technically sound evaluation must ensure that quality assurance is performed by
partners that are not involved in the specific deliverables that are being evaluated.
Also, to ensure consistency of deliverables and consistency of the quality review
process every deliverable will undergo a predefined quality review checklist as
described in Chapter 9.6. The dates of evaluation reports delivery have been
reviewed.
13a/ The dissemination plan is lacking in details such as a clear identification These details will be included in the Dissemination Plan (due by M3) but the text Chapter 7.2 WP2,
and breakdown of target groups and products, what will be disseminated to now provides more elements for future planning. The Joint Action does not use Chapter 9.5
who, and how the impact of dissemination activities will be measured. To term communication manager but Communications Lead, in Chapter 9.5.
ensure consistency and efficiency, a dedicated communication manager
should have been envisaged.
13b/ There are no clear provisions for translation, thus raising concerns on Translations are not foreseen as the primary target group is EU policy
Associated withmakers.
documentThe NA
Ref. Ares(2021)4548885 - 13/07/2021
the capacity to effectively disseminate the results of the proposed activities. Consortium agreement will specify English as the working language. Partners are
free to translate the output into their national languages.
However, WP8 will translate the citizen engagement activities into local languages
in participating countries EN, FR, BE
14/ The sustainability plan is also insufficiently detailed; e.g. it is not The text in Task 4.3 has been clarified to show that the sustainability aspects Chapter 7.2 WP4
sufficiently clear how the ‘option for Economics models focused on the included in the Joint Action's work are a business model for governance agencies
sustainability of a EHDS’ as included in the Call’s expected results will be (WP5) and estimating financing needs of the EHDS, which are at the core of the
developed. TEHDAS work. TEHDAS does not include work on economic modelling of the value
of secondary use of data.
Criterion 3 – Management quality
15/ As 43 partners – including affiliated partners - are envisaged to be We have identified this and therefore the coordination is also supported by Project Chapter 9.1, 9.2
involved in at least one activity and will receive some share of the budget, Support Office (PSO) which is described in Chapter 9.2. PSO is not withing the and 9.7
stronger and more elaborated discussion on the financial and management budget of the joint action, but the coordinator covers the costs outside of the
plans would have been useful. The WP on coordination may be light vis-àvis project. With the addition of PSO the coordination efforts can be considered
the share of coordination and management required by the project. sufficient.
16/ The Consortium is presented through the profile of WPs leaders rather The text is edited to show that the responsibility for Coordination and Work Package Chapter 9.5
than through their organization’s affiliation, which may bear the risk of the leadership is with an organisation, which is shortly described in the text.
project's successful implementation be ‘person-dependent’. The description of key staff put at the disposal of TEHDAS is maintained.
17/ The division of work is not clearly explained, with four main partners The coordinator covers 22% of the total workload. While significant for one Chapter 10.1
envisaged to carry out the majority of the work (these 4 main project partner, the coordination is a major task (cf. comment 15) and the Coordinator is
partners together have 334.25 PMs and the rest of the partners jointly have involved also in substance work. The second biggest partner by Person Months is
193 PMs). For a project which aims to consolidate diverging Member States’ ES because they carry the responsibility for two WPs for which they particularly
opinions, this might present an obstacle in terms of satisfaction of the good experience
project aims. The PM distribution follows the same logic as many other European projects where
WP leads have significantly more work than the rest which is reflected in PMs.
However, all partners regardless of their grant allocation have expressed their
strong commitment to be involved in the processing and adoption of the final
deliverables (see also the response to the next evaluation comment).
18/ With regards to the task distribution, the proposal provides insufficient The text on the zero-budget contribution has been clarified in Chapter
Associated 10.4 Ref.
with document to Ares(2021)4548885
Chapter 10.4 - 13/07/2021
justification of why six partners (Moldova, Bulgaria, Serbia, Estonia, Cyprus show that the partners are committing to full input to the adoption of the final
and Ireland) will contribute 0 PM. deliverables. The term "generic participation" (meaning the same) has been
deleted.
19/ The meaning of ‘generic participation’ to WPs by some partners is not See explanation for 18. Chapter 10.4
clearly explained.
20a/ Although a general risk analysis is included, the proposed risk The risk treatment and contingency plan are explained in more detail, including Chapter 9.6
treatment and contingency plan is insufficiently described, e.g. risks such as conflicts within the Consortium.
potential conflicts within the Consortium are missing.
20b/ Additionally, as this project relies so heavily on interaction with This risk has been added to the list of risks. Chapter 9.6,
stakeholders, significant efforts in terms of risk mitigation should have been
included with regard to communication, reaching consensus etc. with all
listed external parties.
21/ While the proposal has reduced to a minimum face-to-face meetings The application process has shown that this (digitally oriented) group can perform Chapter 9.2,
and travel, references to alternative plans are not fully elaborated - for well also online, also in General Assembly type major meetings during the Chapter 10.1 Other
example, the holding of the General Assembly may not be feasible in person planning. Naturally face-to-face meetings will be organised as soon as the COVID costs, WP1
and the possibility of organizing on-line events may be hampered by situation permits. While no major technical shortcomings appeared during the
disparities in technical capacities. planning this will be secured. Textual addition in Chapter 9.2 and changes in 10.1
to show that hybrid and online meetings are a standard practice.
Criterion 3 – Overall and detailed budget
22a/ The total budgetary allocations for dissemination accounts for 4.36% If communication towards stakeholders were done only in WP2 this would be the Chapter 10.1.
of the total project budget. This seems a small amount considering that the case. WP4 is actually the main stakeholder engagement WP. All stakeholder
project is geared towards communication with various stakeholders engagement activities of WP2 and other WPs added up to the total of 24% of the
including health professionals and citizens. budget. It shows that the Joint Action takes stakeholder communication and
engagement seriously. To clarify, this total calculation of 24% has been added to
Chapter 10.1.
22b/ A large portion of external communication is allocated to WP4, but the As both WP2 and WP4 will be instrumental in stakeholder communication
Associated (see
with document Chapter 7.2 WP2 - 13/07/2021
Ref. Ares(2021)4548885
distinction between these two work packages is not sufficiently clear with above), the division of responsibilities has been clarified. The WP4 work focuses and WP4
consequent implications for the budget. on stakeholders as defined in Chapter 3, and WP2 on more general public
communication.
23/ The rationale for the need to subcontract legal expertise is unclear The use of legal subcontracting has been made clearer in the relevant budget Chapter 10.4
(20.000 euros), as this seems to suggest the unlikely case that such expertise tables in Chapter 10.4. The reason for subcontracting is lack of the specific legal budget tables
is unavailable within the consortium. knowledge available in the contracting partners (WP8), or the shortage of legal
resources (WP5).
24/ The role of partner 19, is not fully clear, as some of its allocated work Partner 19 functions as the co-lead for WP5, and contributes to several tasks (T5.1, Chapter 10.4
will be subcontracted and yet, the budget allocated to this partner is one of T5.2 as the Task Lead and T5.4). The contribution is calculated using the same and budget table fo
the highest (EUR 221490) for an involvement of a total of 17PM. equal principles as for all other partners as regards both the estimated volume and Partner 19
the cost level. The contribution of Partner 19 is similar in volume to the
contribution of the other leading partner in WP5.
25/ Experts affiliated to partner 10 will contribute from a minimum of 0.5 The contributions and costs of the Affiliated Entities to Partner 10 are calculated Chapter 10.4
PM to a maximum of 8 PM with an allocated budget of 120.000 euro, which using the same and equal methodology as for all Partners. Those AEs represent budget tables
seems excessive in the absence of appropriate justifications. highly qualified institutes and bring their specific knowledge to WP8. Their specific
tasks have been listed in the budget tables.
26/ The description of events is insufficiently detailed (e.g. expected number A table describing scheduled meetings is added to 10.1. The basic events are Chapter 10.1 Other
of participants; expected duration; envisaged translation etc.). General Assemblies, PSG meetings, various forums and workshops. Arranging costs.
hybrid and virtual meetings is explicitly defined the Consortium Agreement. See
also the response to Evaluation Comment 21.
27/ Role and tasks of affiliated partners are also lacking in details. All Work Packages have reviewed their AE roles and tasks and clarifications were Chapter 7.2 and
made, including a more detailed division of work such as fine-tuning the Chapter 10.4
structuring of the activities by adding subtasks and added the specific activities to budget tables
be performed by each partner on each subtask. For example, Affiliated Entities
engaged in task 8.4, 8.5 and 8.5, based on their expertiseAssociated
and experiences in public
with document Ref. Ares(2021)4548885 - 13/07/2021
engagement and secondary use of data, will contribute to the literature review and
assessment findings of the Study referred to in Chapter 5, and they will take part in
preparing the initial and final set of recommendations to be delivered in D8.2.
Further, in the more detailed work plan for each WP the exact task of each CA and
AE will be detailed.
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
1 PROBLEM ANALYSIS INCLUDING EVIDENCE BASE
Data sharing and the use of data for research, development and innovations is not as widespread
as it could be in the European Union, among its Member States and associated health and
research structures. Health data is underused, especially for the purpose of secondary use. There
are several reasons for underusing health data. Data is difficult to find and to access, with
sometimes long-lasting bureaucratic permit processes. Data is also dispersed within the health
systems, especially patient and health records. Data in many cases is not semantically
interoperable. Concepts, classifications, and definitions vary from one health data system to
another. Data may not be technically available, due to hermetic systems and undefined APIs.
However, health data increases constantly in the ICT-systems of the health care providers, health
professionals and health care systems.
Regulation on the secondary use of health data differs strongly between the EU Member States
and other participating countries, research project teams might obtain data from one national
or local data source, but not in another country or hospital. The use of data may not be
transparent to citizens. No systematic mechanisms are in place for citizens to either give consent
to the use of their data or to “opt out.” In addition, there are many misconceptions and lack of
trust in the use of health data, related to practices of misuse and failing cybersecurity and privacy
issues. As a result, even in times of Covid-19, the practice of “data altruism” or data donation by
citizens is still a rare practice and lacks an EU-wide regulatory framework.
Data exchange between EU countries exists in cross-border social security and health services
related to labour mobility between the EU Member States and other participating countries. It
primarily focuses on the reimbursement of healthcare costs reimbursement. First EU countries
(Croatia, Estonia, Finland, and Portugal) have recently started to exchange data on medications
(electronic prescriptions) and electronic patients records in the form of so-called Patients
Summaries (Croatia, Czech Republic, Luxembourg, Malta, and Portugal). This was made possible
in 2018 when Members of the European Committee for Standardization (CEN)1 approved the
European Standard for Patient Summaries for unplanned cross-border care. Nevertheless, data
exchange and processing may follow various specific national laws making the collection and use
of data non-transparent.
After more than two years since the General Data Protection Regulation (GDPR) has been
implemented, most of the EU Members States have adopted the new principles and adjusted
their national legislation. Still, there is much to do in this matter. One of the concerns is the
individual’s right to the transparency of the utilization of data, including their sharing – also
cross-border – with third parties. The Commission Communication on European Strategy for
Data and the European initiatives for data governance and services suggest a basis for common
legal framework for Europe and Member States.
One of the biggest challenges is to regulate data flow management and health data transfer
between different service providers and re-use of data for secondary purposes. As a result, a
lack of standard interfaces (data interoperability) and procedures (data portability) results in the
fact that data cannot be used in large cross-disciplinary and cross-border research projects. This
challenge occurs both when the data is used for primary purposes (treatment) or secondary
purposes (not for treatment), e.g. knowledge-based management (training of medical staff,
public health management).
1
Draft European standard 17269 ‘The Patient Summary for Unplanned, Cross-border Care’ approved, CEN,
2016. http://www.ehealth-standards.eu/draft-european-standard-17269-the-patientsummary-for-
unplanned-cross-border-care-approved/ Retrieved 2020-10-14
Date: 2021-06-09 4 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
A baseline condition for the exchange and processing of data from different sources is their
interoperability. To date, most attempts in the European Union to create a common framework
for health data in this regard have been long lasting. During last years, the exchange of essential
health data in cross-border healthcare has started. It was recently regulated in the eHealth
Digital Service Infrastructure (eHDSI) and implemented by the Commission and the Member
States through the Connecting Europe Facility (CEF) Programme. The eHDSI allows exchanging
two sets of health data: patient summaries and ePrescriptions.
Still, there is much work to be done to achieve pan-European data interoperability, including
legislative (common interpretations of the GDPR) and technical interoperability (common data
standards) between organisations. Although the eHealth Network, many EU Member States and
other participating countries have recently undertaken initiatives to introduce interoperability
standards, data classifications and definitions, the strategies and adapted solutions vary by
country in Europe. It is essential to perceive the compatibility of data from the three2 angles of
interoperability: foundational, structural (both technical), and semantic. The revised European
eHealth interoperability framework adopted by the eHealth Network in 2015 defines four
aspectsi, legal, organisational, technical and semantic.
The implementation of standards such as HL7, FHIR (Fast Healthcare Interoperability Resources),
ICD-11 or SNOMED CT (Systematized Nomenclature of Medicine Clinical Terms) is still ongoing.
Many systems collecting and processing health data are developed in silos – they are unable to
communicate with other systems.
COVID-19 has stressed health systems capacities. We have learned that the basis for sustainable
health systems is that they are flexible to adapt to changing conditions. Thanks to recent
advances in digital health, citizens under lockdown conditions could use safe teleconsultation
services, obtain electronic prescriptions, and be monitored remotely. Citizens have started using
mobile applications for contact tracing to contribute to fight the COVID-19 pandemic.
The difficulties of sharing data have been acknowledged in many international contexts,
including by the World Health Organization and OECD, leading also to attempts to create
regional solutions. The Nordic countries have sought to solve the lack of interoperability by
developing a vision3 for their cooperation.
Many problems of secondary use of health data remain similar in both advanced and less
advanced European countries, such as ethical issues, consent, cyber security. Some problems
are more pronounced in less advanced countries, such as lack of legal framework, digitalisation
of information systems or shortage of skilled personnel. These problems also limit the ability to
participate in European cross-border data sharing.
However, the experience shows that countries at different economic levels can set up and run
high-quality health information systems if the importance of the use of data is recognised.
Promotion of primary and secondary of data in all countries must combine promoting
recognition of the importance of data, creating a conducive legal environment (the focus of this
Joint Action), as well as investments in infrastructure, methods, and skills. There exists a demand
to develop more advanced methods and models to share the data from service providers,
regional systems, and national systems. Efforts to enable data sharing in the EU
Article 168 of the Treaty (TFEU) requires that the Union respects the responsibilities of the
Member States for the definition of the health policy and organisation and delivery of national
2
https://innovatemedtec.com/digital-health/interoperability
3
A vision of a Nordic secure digital infrastructure for health data: The Nordic Commons.
http://norden.diva-portal.org/smash/record.jsf?pid=diva2%3A1376735&dswid=3079 Retrieved 2020-10-
14.
Date: 2021-06-09 5 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
health services and medical care. The EU health policy and interventions serve to complement
national responses. They aim to protect and improve the health of EU citizens, support the
modernization of health infrastructure, and improve the efficiency of Europe’s health systems
(see for example a discussion on the COVID response 4). 2F
In December 2017, health ministers agreed at the Council of the European Union on the broad
lines of action for digital health. While the Council Conclusions 4 concentrated on the primary
3F
use of health data, ministers urged the Member States and the Commission to implement
citizens' right to have access to their health data, to enable its cross-border exchange and the
availability of comparable and high-quality health data for research and innovation.
In 2018, The European Commission published a Communication 5 enabling the digital 4F
transformation of health and care in the Digital Single Market; empowering citizens and building
a healthier society.6 It outlined three priorities:
− Citizens' secure access to their health data, also across borders - enabling citizens to
access their health data across the EU.
− Better data to advance research, disease prevention and personalised health and care -
allowing researchers and other professionals to pool resources (data, expertise,
computing processing and storage capacities) through shared European data
infrastructures across the EU.
− Citizen empowerment with digital tools for user feedback and person-centric care -
using digital tools to empower people to look after their health, stimulate prevention
and enable feedback and interaction between users and healthcare providers.
The Communication mentioned results of a public consultation 7 that was carried out in
5F
preparation of a Communication, which recognised the need for further work on identifying
important challenges that prevent digital health and care solutions from being adopted across
the EU.
The main findings showed that over 93% of over 1400 respondents to an online questionnaire
believe that “Citizens should be able to manage their own health data”. Furthermore, 83% of all
respondents either agreed or strongly agreed with the statement that “Sharing of health data
could be beneficial to improve treatment, diagnosis and prevention of diseases across the EU".
The overwhelming majority of all respondents (74%) identified improved possibilities for medical
4
Council Conclusions 2017 on digital health under the Estonian Presidency.
https://eurlex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:C:2017:440:0003:0009:EN:PDF
Retrieved 2020-1014.
5
Communications from the Commission to the European Parliament, the Council, the European
Economic and Social Committee and the Committee of the Regions on enabling the digital
transformation of health and care in the Digital Single Market; empowering citizens and building a
healthier society. Brussels, 25.4.2018 COM (2018) 233 final
https://ec.europa.eu/newsroom/dae/document.cfm?doc_id=51628 Retrieved 2020-10-14.
6
Council Conclusions 2017 on digital health under the Estonian Presidency. European Union, 2017.
https://eur-lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:C:2017:440:0003:0009:EN:PDF
Retrieved 2020-10-14.
7
Synopsis Report on a Consultation on Transformation Health and Care in the Digital Single Market.
European Union, Brussels, 2018.
https://ec.europa.eu/health/sites/health/files/ehealth/docs/2018_consultation_dsm_en.pdf
Retrieved 2020-10-14.
Date: 2021-06-09 6 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
research as a reason for supporting cross-border transfer of medical data, which was higher than
for their purpose of their own treatment (68%). Even more respondents (80%)
4
J. Hackenbroich et al. Health sovereignty: How to build a resilient European response to pandemics, June
2020.
https://www.ecfr.eu/publications/summary/health_sovereignty_how_to_build_a_resilient_europe
an_response_to_pandemics Retrieved 2020-10-14.
agreed to share their health data if privacy and security were ensured. One key ambition which
was raised was the shared health resources allowing targeted and faster research, diagnosis, and
treatment.
However, the 2018 Communication was not the starting point for the discussion of health data
in Europe. Before that, Directive on Patients’ Rights in the Cross-Border Healthcare (2011/24/EU)
can be considered a major milestone for cross-border healthcare in Europe. It defined patient
rights in cross-border healthcare, set up the European reference networks (ERN) and the eHealth
Network. These structures brought collaboration to a new level in Europe: The ERNs and cross-
border exchange of ePrescriptions and Patient Summaries is operational. Recent developments
in data analytics, AI, real-world data (RWD) and in general in the secondary use of health data
have brought new requirements for European collaboration.
In the mission letter to Commissioner Kyriakides 8 in September 2019, President of the European
6F
Commission, Ursula von der Leyen reinforced these intentions by raising a European Health Data
Space as one of the priorities in the EU health policy. She wrote that the Commissioner for Health
should work on:
The creation of a European Health Data Space to promote health-data exchange and
support research on new preventive strategies, as well as on treatments, medicines,
medical devices, and outcomes. As part of this, you should ensure citizens have control
over their own personal data.
The use of health data was further discussed at meeting of EU health ministers in December
2019 under the Finnish Presidency of the Council, which noted9 the importance of to make use
of the potential of health and social data for advancing public health, research, and innovation,
and in July 2020 during the German Presidency.
The situation was thoroughly analysed in the Commission Communication on the European
Strategy for Data10, underlining that the EU has everything to play as an important global player
in the data economy of the future. The Communication lays out a vision that “health is an area
where the EU can benefit from the data revolution, increasing the quality of healthcare, while
decreasing costs.” Further, strengthening and extending the use and re-use of health data is
critical for innovation in the healthcare sector. It underlines “a common European health data
space, which is essential for advances in preventing, detecting and curing diseases as well as for
informed, evidence-based decisions to improve the accessibility, effectiveness and sustainability
of the healthcare systems.”
8
Commissioner-designate for Health to Stella Kyriakides, Brussels, 10 September 2019. Retrieved 202010-14.
https://ec.europa.eu/commission/sites/beta-political/files/mission-letter-stella-kyriakides_en.pdf
Retrieved 2020-10-14.
9
https://data.consilium.europa.eu/doc/document/ST-13171-2019-INIT/en/pdf Retrieved 2020-10-14
10
Commission Communication on a European strategy for data: https://eur-
lex.europa.eu/legalcontent/EN/TXT/?qid=1593073685620&uri=CELEX%3A52020DC0066 Retrieved 2020-10-14
Date: 2021-06-09 7 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
This policy formulation process took a decisive step on 1-2 October 2020, when the European
Council11 welcomed “the creation of common European data spaces in strategic sectors, and in
particular invites the Commission to give priority to the health data space, which should be set
up by the end of 2021.”
2 GOALS AND OBJECTIVES OF THE PROJECT
2.1 General Objectives of the Project
While the Council Conclusions in 2017 set up a broad strategy for the European Union to
promote digital transformation in health and care, the European Council adopted a specific call
to set up the European Health Data Space by the end of 2021.
Setting up the Joint Action under the 2020 Work Programme10F13 (Work Programme 2020) of
the Third programme for EU action in the field of health (3rd Health Programme) is a logical step
to implement the ideas in the Conclusions.
The Work Programme 2020 sets the following objectives of the Joint Action:
− Contribute to ensuring the protection and free flow of data in the health sector based on
the examination how Member States and other participating countries have applied the
GDPR rules on processing health data.
− Draft options on the secondary use of health data, including the application of big data
and artificial intelligence in health and long-term care.
− To provide technical support for the development of guidelines on effective methods for
enabling the use of medical information for public health and research.
− Propose options for governance models for data-sharing at EU level, in particular
networking for secondary use.
As the expected result of the Joint Action, the Work Programme underlined the need for a data
governance model for secondary use of health data. The other expected result, a Code of
Conduct for health data processing under Article 40 of the GDPR to be developed by
nongovernmental stakeholders, has been separated to another project. However, the Joint
Action will need to encourage and support this separate process, where stakeholders produce a
code of conduct for health data processing. The Joint Action will need to ensure the link to its
interpretation and use as well as encourage stakeholders to adopt the code.
The Member States, other participating countries and the EU institution have often underlined
the need to ensure that citizens have control over their personal data12.
The policy expectations were elaborated in the annex of the European Health and Digital
Executive Agency HaDEA’s invitation to set up a Joint Action13. The invitation adds to and details
the objectives and expected results.
11
Conclusions of the special meeting of the European Council 1 and 2 October 2020.
https://www.consilium.europa.eu/media/45910/021020-euco-final-conclusions.pdf Retrieved 202010-14.
12
European Data Strategy, Making the EU a role model for a society empowered by data. European Commission,
Brussels, 2019. https://ec.europa.eu/info/strategy/priorities-2019-2024/europe-fitdigital-age/european-
data-strategy Retrieved 2020-10-14.
13
Third programme for EU action in the field of health 2020 work programme, ANNEX to the
Commission Implementing Decision concerning the 2020 work programme in the framework of the
third programme of Union action in the field of health (2014-2020) and the EU’s financial contribution
Date: 2021-06-09 8 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
In particular, on the governance model, the Joint Action should develop proposals and options
for data-sharing, including data governance structures and functions that ensure a fair,
transparent, non-discriminatory, and balanced relationship between the involved parties,
between different Member and other participating countries across Europe. The Joint Action
should develop, explore, and analyse options on data governance, data quality and data
infrastructure, as well as sustainability and ethical models.
Further expectations include support to EU and national authorities as well as the medical
community to agree on interoperability guidelines. These should deal with data quality and a
technical backbone:
− Semantic interoperability guidelines, ways of anonymization and re-use of health data by
adhering to the FAIR principles of being Findable, Accessible, Interoperable and
Reusable; and
− Technical interoperability guidelines to provide a technical backbone for the European
Health Data Space and take advantage of existing infrastructures.
Based on these expectations expressed by the Member States, other participating countries, and
the European Commission, the Joint Action has a broad, policy related General Objective. The
General Objective expresses that a wider secondary use of health data would bring benefits at
individual and community level, as well as for authorities and businesses and such use would
apply to all aspects of public health, such as prevention, diagnostics, and treatment:
“The Joint Action Towards the European Health Data Space (TEHDAS) helps the Members
States and the Commission in developing and promoting concepts necessary for sharing
of data in secondary use for purposes of citizens’ health, public health, as well as health
research & innovation in Europe.”
The goal relevant to the EU is that sharing can take place across national borders:
“In the future Europe, citizens, communities and companies benefit from a protected and
secure access to seamless health data available regardless of where it is stored.” These two
statements form the mission statement of the Joint Action.
The General Objective is translated into the Specific Objectives described in the next section.
2.2 Specific Objectives of the Project
The Joint Action Towards the European Health Data Space has five Specific Objectives:
1. Produce elements and options for an operational framework and governance models
for the exchange and secondary use of health data between European countries,
respecting the principles of transparency, trust, FAIRness, citizen empowerment and a
common good.
2. Provide solutions for the trustworthy secondary use of health and health care data with
a view to fostering the digital transformation of the European health systems.
to the WHO Framework Convention on Tobacco Control, European Commission, Brussels, 28.1.2020
C (2020) 368 final, Brussels, 2020.
https://ec.europa.eu/health/sites/health/files/funding/docs/wp2020_annex_v1_en.pdf Retrieved 2020-10-
14.
Date: 2021-06-09 9 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
3. Provide a catalogue of services to support the secondary use of health data through the
European Health Data Space as well as the architecture and infrastructure options
required for its deployment.
4. Obtain a better understanding of citizens’ relationships with health data and provide a
European perspective to improve citizens’ engagement with data, and trust in, data
sharing while strengthening the health data governance mechanisms for cross-sector
data use and for data use in the common sectoral data spaces at EU level and in the
Member States and other participating countries relevant.
5. Outreach and engage national and international players, to the TEHDAS Joint Action to
reflect their needs and expectations, explore views on its economic sustainability as well
as suggest concrete ways to integrate the results into the future EHDS.
The following graph illustrates the relationships between the General Objective, Specific
Objectives, and Work Packages.
Figure 1 The General and specific objectives, and their relation to the Work Packages
To support the development of a common European health data space, the Joint Action will
propose concepts that apply to any secondary use of data, not limited to specific use cases. This
also applies to types of secondary use, such as anonymous or pseudonymous data. However,
the scope of proposals will focus on cross-border use of data; national linkages are only
addressed when relevant.
The Joint Action has analysed the intervention logic for this project aiming at policy
development. Outcomes from the project will materialise through the implementation of the
Joint Action’s proposals as described in Chapter 7. The intervention logic is presented below.
Date:
2021-06-09 10 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Figure 2 The intervention logic of the Joint Action Towards the European Health Data Space
Based on this intervention logic, the following process, output, and impact/outcome indicators
will be followed in the project (Table 1).
Table 1 Objectives and indicators
# Specific Objective Title and Description
O1 Produce elements and options for an operational framework and governance models for
the exchange and secondary use of health data between European countries, respecting
the principles of transparency, trust, FAIRness*, citizen empowerment and a common good.
FAIR = Findable, Accessible, Interoperable, Reusable
Main responsibility: WP5
Process Indicator(s) Target
value
Relevant surveys conducted 4 (with 60% av. Response rate)
Workshops conducted 4
Relevant major studies analysed 3
Output Indicator(s) Target
value
Number of countries included in the use cases for scientific research and policymaking 10
Number of countries that have described their national designated body as health data access 10
permitter/provider
Number of partnership agreements designed 1
Outcome/Impact Indicator(s) Target
value
Number of countries contributing to recommendations on national legislation 10
Date:
2021-06-09 11 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Number of stakeholder categories involved in entire proposal process (e.g., Patient 7
organizations, Citizen organizations, Healthcare professionals, Healthcare providers, Industry)
Number of Member States and other participating countries contributing to recommendations 4
of best practices
# Specific Objective Title and Description
O2 Provide options for the trustworthy secondary use of health and health data with a view to
fostering the digital transformation of the European health systems.
Main responsibility: WP6
Process Indicator(s) Target value
Main data quality assurance experiences in Europe outreach 80%
Main semantic interoperability experiences in Europe outreach 80%
Output Indicator(s) Target value
Solutions for data quality assurance assessed 100%
Solutions for semantic interoperability assessed 100%
Outcome/Impact Indicator(s) Target value
Data quality assurance framework agreement btw MSs achieved 100%
Relevant research questions (users’ view) covered by the Common Data Model 80%
# Specific Objective Title and Description
O3 Provide a catalogue of services to support the secondary use of health data across
through the EHDS as well as the architecture and infrastructure options required to its
deployment.
Main responsibility: WP7
Process Indicator(s) Target value
Analysis of data sharing initiatives 15
Set up of thematic workshops 4
Output Indicator(s) Target value
Catalogue of services options catalogue 1
Catalogue of architecture options 1
Catalogue of infrastructure options 1
Outcome/Impact Indicator(s) Target value
Number of stakeholders involved in the Users and Implementers Forum 20
Date:
2021-06-09 12 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Number of Member States and other participating countries engaged to follow up the 10
Joint Action developments
# Specific Objective Title and Description
O4 Obtain a better understanding of citizens’ relationships with health data and to provide a
European perspective to improve citizen’s engagement with, and trust in, data sharing and
data portability while strengthening health data governance mechanisms for cross-sector
data use and for data use in the common sectoral data spaces through co-design at EU
level.
Main responsibility: WP8
Process Indicator(s) Target value
Collect international publications on the topic of citizen perception and engagement 60 by M6
Identify and engage health data citizen sensitization initiatives in countries 3 by M6
Number of national and EU-wide multi stakeholder workshops, conferences, events At least 4 (8.1) + 9
on citizen perception of health data and data altruism (8.2) = 13 by M24
Output Indicator(s) Target value
Elaborate a set of practicable recommendations for the EHDS At least 3 by M24
Number of stakeholders (persons) representing national/regional/international 20 by M7, 80 by M24
authorities, organisations and projects/initiatives represented in the events
Number of stakeholders (persons) reached out by newsletters 20 by M7; 80 by M24
Outcome/Impact Indicator(s) Target value
Reaching citizens across all pilot countries through the website and the citizen survey. 50000 EU visitors
5000 respondent
citizens by M17
Initial set of definitions, good practices and use cases of data altruism and altruism 1 set by M7
structures and functions for the future EHDS
Final set of recommendations how to share lessons learned to be applied for the 1 set by M24
GDPR-compliant application of data altruism practices and adopt and harmonize
identified good practices and implement use cases for the construction of national
or European health data space
# Specific Objective Title and Description
O5 Outreach and engage national and international players, to the TEHDAS to reflect their
needs and expectations, explore views on its economic sustainability and suggest
concrete ways to integrate the results in the EHDS.
Main responsibility: WP4
Process Indicator(s) Target value
Number of country visits virtual or face-to-face 8 countries
Date:
2021-06-09 13 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Number of Policy and Project Forum 4 meetings in
total
Output Indicator(s) Target value
Fact sheets describing key needs and expectations reflected in country visits 8 fact
sheets
produced
Policy and Project Forum report with participants view on the value of exchanging 4 meeting
secondary data reports
Sustainability plan describing WPs and which existing data infrastructures can be 1 report
leveraged and remain as a building block of EHDS.
Outcome/Impact Indicator(s) Target value
Number of health information system stakeholders (e.g., Ministry of Health, 4
Statistical Office, National Public Health Institute, Health Insurance fund) engaged stakeholde
per country visit rs per country
Number of MS/AC’s authorities, international organisations, initiatives, and projects Overall average
represented in the fora participation of
2/3 of selected
stakeholders
including 10% of
MS by M9, 50% of
MS by M16 and
90% of MS or
AC by M24
3 STAKEHOLDER - TARGET GROUPS
The stakeholder and target groups for the TEHDAS Joint Action can be divided into the primary
target group of the proposals emanating from the JA, those having direct interest in proposals,
and the actors in the EHDS, in particular as regards the secondary use of data.
The Joint Action will generate proposals for policy measures and their implementation, which
are directed towards health data policy makers in the Member States, other participating
countries and the European Union institutions and bodies. These policy makers in Member
States and other participating countries include ministries and authorities responsible for health,
research, innovation, and data protection. The corresponding bodies in the EU include in
particular the relevant Directorates General in the Commission, the European Parliament, the
European Data Protection Board, the European Medicines Agency, the eHealth Network and the
European Centre for Disease Prevention and Control.
Several groups of actors, stakeholders, will have a direct interest in the proposal but they can
also bring in valuable insights and input the proposals. These stakeholders are traditionally
grouped into citizens and patients, healthcare and healthcare professionals, researchers and
academia, private sector companies, and authorities and regulators. The last group
automatically participates in the work of the Joint Action due to its structure, but the range of
authorities will only be partially covered, mainly through health ministries.
A particular stakeholder group is formed by relevant international organisations, such as the
World Health Organization, OECD, and standardisation organisations. They develop
international data sharing policies, which influence the global environment where the European
Date:
2021-06-09 14 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Health Data Space will operate. The non-EU or third countries will be important partners in
generating data and potentially using the data.
The final stakeholders in the secondary use of data through the European Health Data Space
form a wide spectrum of people and bodies which generate health data, use it in various
secondary use cases, decide on or promote access, protection and use of health data, or have
another interest towards health data. The following non-exhaustive list illustrates this variety:
Stakeholders generating health data:
• Individuals as citizens and patients
• Healthcare providers including primary care, hospitals
• Healthcare professionals
• Research organisations, registries, biobanks
• Companies involved in wellbeing, health, and health technology industries,
Stakeholders utilising health data in the secondary use case:
• Health information systems, analytical services providers and healthcare
managers and professionals
• Research organisations, universities, think tanks, medical charities
• Pharmaceutical, medical devices and other health related industries, those
using
Artificial Intelligence (AI)
• Local and national decision makers, parliamentarians, and councillors
• National governments and authorities in public health, social care, statistics,
Stakeholders guarding access to and protecting data
• Civil society organisations, NGOs
• National health data access and permit authorities
• Data protection authorities and regulators
• Organisations working on standardisation of health data.
The Joint Action will take these stakeholders and target groups into account in the planning of
its work. The wider primary audience will be consulted through the forums in WP 4 and
consultation processes with national and EU bodies. Stakeholder organisations (typically NGOs)
will be involved through the stakeholder consultation process described in Chapter 9. The results
of the work will be promoted among stakeholders through the communication actions in WP 2.
4 POLITICAL RELEVANCE
4.1 Contribution to the Annual Work Plan
The TEHDAS Joint Action addresses directly an issue at the heart of the Third Programme for the
Union’s action in the field of health (2014-2020). The Joint Action is anchored to Thematic
Priority 3.2 "Innovation and e-health" but its results - building blocks of the European Health
Data Space - will contribute to many other Thematic Priorities of the Programme Regulation.
The Annex I to the Programme Regulation lists the main thematic priorities:
• Promote health, prevent diseases, and foster supportive environments for healthy
lifestyles,
• Protect Union citizens from serious cross-border health threats,
• Contribute to innovative, efficient, and sustainable health systems
• Facilitate access to better and safer healthcare for Union citizens
Date:
2021-06-09 15 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
All the four Thematic Priorities underline the need for a health information and knowledge
system, which contributes to evidence-based decision-making (sub-themes 1.6, 2.4, 3.7, 4.6).
The 2020 work programme lists as one of its expected results “a GDPR-compliant data
governance model ... for health(care)-related data”, which is at the heart the JA proposal.
The objectives of the work programme and the guidance given by HaDEA on its implementation
have been described in Chapter 2.1.
The specific part of the 2020 work programme further notes that the Joint Action must build on
the outcomes of the preparatory workshops with the Member States, other participating
countries, and other experts by the Commission. For that purpose, the Commission provided an
advance version of the report on Member States’ rules and systems on processing of health data,
which this proposal considers.
Particular attention has been given to the outcomes of past actions funded by the Health
Programme on related topics and considering of ongoing negotiations of a legislative nature.
4.2 Added Value
The Joint Action Towards the European Health Data Space will support a key objective of the EU,
which is ensuring the seamless flow of health data in the context of the Single Market.
The Joint Action will create EU added value by contributing to the legislative process for creating
the European Health Data Space. The Joint Action will engage the key actors of the process, the
Member States and other participating countries, in the design of elements of the forthcoming
legislative measures and their future implementation. Through the dialogue with the
Commission, the Joint Action will improve both the quality of the future legislation as well as its
practical implement ability.
The Joint Action will bring together actors relevant to secondary use of data in the EU. It will
promote their networking through practical contacts and by suggesting the key criteria and
functions for setting up such a network. One of the main outcomes of the Joint Action is a
suggestion on knowledge-sharing and peer learning networking of the designated bodies in
Member States and other participating countries. Such bodies may grant permits for data use,
promote the use of health data, improve the interoperability of data cross-borders.
The expected effects of the Joint Action are long-term by nature: legislative measures and
implementation bodies suggested will be lasting societal structures in the EU health policy.
The results will have a wide applicability in Member States and other participating countries. The
advice and guidelines produced on use cases and interpretation of the General Data Protection
Regulation (WP5) and on citizen perception of health data and data sharing practices (WP8) can
be replicated in all Member States, other participating countries and regions. The Joint Action
will also collect the best practice available in the EU on the secondary use of data. The proposed
benchmarking and other infrastructure tools will help to assess data quality and interoperability
and develop it further. WP6 and WP7 envisage architecture for the infrastructure and layers of
interoperability (semantic, technical).
The TEHDAS will not operate in a vacuum. It will continue the work carried out by the eHAction
Joint Action and its predecessors and expand its work on secondary use of health data as
foreseen in Article 14 of the Directive on Patients’ Rights in Cross-Border Healthcare.
eHAction’s work on empowering people and patient access and use of data (eHAction WP4) and
innovative use of health data (WP5) will be of relevance to TEHDAS. eHAction worked to develop
a common vision of innovative use of data in healthcare, policy relevant actions on innovative
use of big data and common principles for big data governance. This will be continued and
expanded as part of several TEHDAS work packages.
Date:
2021-06-09 16 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
It will also build on the work from BRIDGE Health and the Joint Action on Health Information
(InfAct). InfAct builds towards the set-up of a research infrastructure for health information in
Europe. Relevant work includes governance and operational structures and discussions held with
policy makers and researchers across Europe to define services needed in relation to secondary
use of data across Europe, assessing and piloting interoperability. InfAct has piloted a distributed
infrastructure standing on the pillar of the European Interoperability Framework and the FAIR
principles, which will be further investigated in TEHDAS.
These projects are examples of the work carried out in the EU on health data and its use, whose
results will be considered in the TEHDAS Joint Action.
Through its nature as preparatory action towards the European Health Data Space, the TEHDAS
Joint Action will create links to and between other projects and initiatives in the field of health
data, such as the COVID-19 Data Portal of the European Commission, 1+Million Genomes
initiative (1+MG), eHealth Digital Service Infrastructure, the European Reference Networks,
European Joint Programme on Rare Diseases (EJP RD), Gaia-X, health-related European Research
Infrastructure Consortiums (such as ELIXIR, EATRIS, ECRIN, BBMIR, Euro-Bioimaging), the
Population Health Information Research Infrastructure (PHIRI) for COVID-19, and the DARWIN
platform suggested by the European Medicines Agency.
This will provide EU-added value in the light of the COVID-19 pandemic and in the preparation
for future health pandemics and other health threats. TEHDAS underlines the need to link
separate data systems, avoid data silos not to focus on single business cases and to consider the
necessary links with other initiatives.
4.3 Pertinence of Geographic Coverage
The TEHDAS Joint Action covers 25 European countries. 21 European Union Member States and
4 other European countries are represented. The EU Member States are Austria, Belgium,
Croatia, Cyprus, Czechia, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Ireland,
Italy, Lithuania, Malta, the Netherlands, Portugal, Slovenia, Spain and Sweden, and the non-EU
countries are Moldova, Norway, Serbia, and the United Kingdom.
The population of these countries is over 458 million people (1 January 2020, Eurostat). The EU
countries cover approximately 83 % of the EU population.
Figure 3 Map of the 25 participating countries in TEHDAS
Date:
2021-06-09 17 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
4.4 Context of the project work
Health systems and health data systems vary between countries and regions, and in particular
the concept of secondary use of health and social data is different. Diverging interpretations of
data protection in EU Member States and other participating countries was one of the underlying
reasons for the Joint Action. The TEHDAS Joint Action will address the needs of countries in
different stages of development for the secondary use of health data and thus seeks to bridge
disparities between health systems.
The secondary use of health data carries great social value through its objectives which focus on
the improvement of health system performance, the promotion of health in line with the
definition set out by the WHO as being a state of complete physical, mental and social well-being
and not merely the absence of disease or infirmity, and better research and innovation capacities
in the EU. The results of the secondary use of health data may also lead to policies and programs
targeting under-privileged groups and minorities, focussing on principles of diversity and equity
in research and policymaking. Creating trust by all stakeholders in the secondary use of health
data is one of the prerequisites for its effectiveness, a key component included in the work of
WP5 on governance and linked with the citizen-centric approach for health data of WP8,
assessing citizens’ perceptions on health data. Ethical, legal, and social issues (ELSI) will be a part
of all work packages.
The TEHDAS Joint Action has important political stakes, as described in Chapters 1 and 2.
Data used in the Joint Action is non-personal, such as descriptions of health data systems and
legislation. There will be no personal or identifiable health data, such as names or contact
information. Strict compliance with the GDPR will be ensured by all WPs of the Joint Action.
5 METHODS AND MEANS
Joint Actions are instruments, enabling the EU Member States and other participating countries
to join forces with the support of the European Commission to design and provide common
solutions to EU-wide technical or policy-related problems, or both. The aim is to strengthen
European cooperation.
The TEHDAS Joint Action offers a way to plan policy and implementation for the sharing of health
data cross-borders in the EU and beyond (WP5), while engaging both Members States and key
stakeholders in the process (WP4). Partners involved in the Joint Action are key influencers of
today’s and tomorrow’s health policy in their respective Member States and other participating
countries, and specifically designed for the Joint Action, thereby ensuring a close link with the
effective policy adoption process both at national and EU-level.
The TEHDAS Joint Action will provide a platform for Member States and other participating
countries to collaborate on policy-related, legal, and organisational questions related to sharing
of health data (WP5). The TEHDAS JA works also on semantic and technical issues (WP6 and
WP7), thus covering all aspects of the European Interoperability Framework13F16, endorsed by
the eHealth Network.
Being primarily a policy-oriented Joint Action, TEHDAS will consider the constantly evolving
policy environment, including legislative and policy guidance from the European Council and the
Council of the EU, the opinions of the European Parliament and the proposals from the
Commission in the field of health, artificial intelligence, and digital policies (Steering Group,
WP5).
The TEHDAS JA will bring together Member States’ and other participating countries’ strong
knowledge, experience, and expectations towards sharing health data across EU borders in a
unique way. Using their strong national networks, skills, capacities and close involvement in
national and EU policy processes, JA partners can produce practicable recommendations for
Date:
2021-06-09 18 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
EUlevel measures. Designated competent authorities of the participating Member States and
other participating countries will form a policy and technical resource to plan for sustainable
solutions and to engage governmental and non-governmental actors in the process of building
the future EHDS. The diversity of participating countries will help to assess proposals regarding
different stages of development and disparities between health systems and take the maturity
in the secondary use of data into account.
The TEHDAS JA will also build on existing achievements and dialogue with similar projects and
activities (mapped in WP4), in which participants have been involved. This includes many
previous Joint Actions and projects, the most relevant of which are described in Annex.
Coordination will reduce overlaps and ensure that the new proposals consider earlier
preparatory work and create links with current projects and processes. As the European Health
Data Space is meant to integrate the complete health data ecosystem, JA partners will have the
capacity to build on existing synergies to prevent data silos. The JA will also assess current best
practices as a background for policy proposals (all Work Packages WP4-WP8).
Finally, the TEHDAS JA will include mechanisms to involve various stakeholders in the process
and identify their expectations, knowledge, and experience in the outputs of the Joint Action
(WP4).
The following governance methods are applied to ensure high-quality outputs:
− The governance of the JA ensures close collaboration between the partners and
implements a coherent review process of all documents produced by the 8 Work
Packages. It ensures that all documents meet the expectations of all Partners.
− When final documents are produced, such as policy papers or guidelines, the JA will
bridge the gap between the different views and explain options considered. Interaction
among partners, supported by the Coordinator, will be essential.
− The project management structure will enable WP Leaders to obtain oversight and
influence the format and structure of deliverables so that they are all aligned.
− A stringent quality control will cover all deliverables, including the content, format, and
language, which needs to be understandable to audiences not familiar with the topic.
− The JA will produce a limited number of deliverables, some of them divided into several
tasks, using “Milestones,” timed to fit the policy process. This also implements a
continuous improvement process of the outputs.
All TEHDAS Work Packages will consider the study on “Assessment of the EU Member States’
rules on health data in the light of GDPR” produced by the EU Health Support Consortium for
the Commission. While the final report was still unpublished at the time of the drafting of this
application, applicants obtained some advance information of the study results. The findings of
this study will be particularly important for WP4, WP5 and WP8.
6 EXPECTED OUTCOMES
The Joint Action will develop concepts and options necessary for efficient secondary use of
health data. These will help to create and adopt through appropriate mechanisms common and
transparent guidelines, principles, regulations, and decision-making should be available for the
secondary use of health data in Europe, the EU Member States and other participating countries.
This will enable better, faster, and easier access to health data for research organizations, policy
makers, heath service developers and health professionals, consulting and management
organisations, health industry and, very importantly, citizens.
Date:
2021-06-09 19 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Shared practices, cooperation and interaction mechanisms between data permit authorities and
data controllers in the Member States and other participating countries will enable to foster an
improved access to health data and across borders.
It is expected that following the adoption of EU-wide legal instruments on secondary use of data,
accompanied by financial support for practical action, benefits of wider secondary use of data
start emerging as described below. However, this will only happen if countries invest in the use
of data and the EU moves swiftly on creating the European Health Data Space to facilitate use of
data across national borders.
The volume of usage of existing health data will have increased and the benefits visible for a
wide number of users, research and innovative development project teams using data for better
health services, evidence-based health care, management and health products and care.
The wealth of health data sources can be used to obtain a better understanding of health
conditions and treatments.
The trust of citizens will have increased towards the use of health data for public interest and
transparency on the usage of personal health data will be improved, especially on the why, what
and who is handling the data.
Opportunities for cost-savings for data-users such as researchers when using digital data sources
and remote access across the EU instead of traditional statistical data collection methods only.
There will be an increased use of health data and better dissemination of European common
rules and guidelines for the secondary use of health data. There will be options to combine
health data with multisectoral data sources. Research focus will be redirected to health
inequalities. There will be a potential to improve disease prevention and early warning
mechanisms thanks to new avenues of data analytics, artificial intelligence, and machine
learning. Artificial intelligence and machine learning will also set a new demand on the quality
of healthcare data, databases, and repositories. 14 4F
There will be increased evidence for health care practices with increased use of health data by
researchers, health care professionals and policy makers. Data-based decision support for health
professionals will increase the quality of care and harmonize health care procedures will
considering key determinants of health.
There will be more insight on how to make health care systems, health care practices and health
management can be more effective thanks to a more effective use of health data.
Public health and health policy makers can plan and monitor their activities more precisely and
more aligned with regional, national, and European data, benchmark their own results more
easily with other structures and develop more effective policies, practices and means.
Health industry players will be able to make effective use of more available health data for the
developments of new innovations and, for example, in different phases of drug and health device
development.
14
Gómez-González, E. and Gómez, E., Artificial Intelligence in Medicine and Healthcare: applications,
availability and societal impact, EUR 30197 EN, Publications Office of the European Union,
Luxembourg, 2020, ISBN 978-92-76-18454-6, doi:10.2760/047666, JRC120214.
Date: 2021-06-09 20 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
7 WORK PACKAGES
7.1 Overview of Work Packages (WPs)
# WP Title WP Description
WP1 Coordination of the project The Work Package ensures the coordination and management of
the project and its implementation as planned.
WP2 Dissemination of the project The Work Package makes available and promotes the results and
deliverables of the project to the target groups and citizens.
WP3 Evaluation of the project The Work Package verifies that the project is being implemented
as planned and reaches the objectives.
WP4 Outreach, engagement and The Work Package engages national and international
sustainability stakeholders by integrating their needs and expectations and
exploring their views on economic sustainability and promotes
the implementation of the Joint Action’s results.
WP5 Sharing data for health The Work Package develops options for a transparent and FAIR
operational framework and governance models for the exchange
and secondary use of health data, based on trust, citizen
empowerment and a common good.
WP6 Excellence in data quality The Work Package provides guidance on data quality assurance,
and solutions for semantic interoperability.
WP7 Connecting the dots The Work Package provides options for the technical
interoperability elements of the EHDS, according to the
European Interoperability Framework.
WP8 Citizens The Work Package seeks to obtain a better understanding of
citizens’ relationship with health data in the EU, to better inform
and sensitize citizens regarding health data and recommends
data altruism practices for the EHDS.
7.2 Work Packages (WP) Description
WP No. WP1
WP Title Coordination of the project
Start M1 Ending month M30
Lead Sitra
Applicant # 1 Acronym Sitra PM 50
Date:
2021-06-09 21 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Objectives
The objective of the WP is the high-quality overall management of the project and the consortium. This
includes establishing of the management structure, procedures, and guidelines for the operations,
providing systematic monitoring of the activities, establishing reporting guidelines, providing technical
and financial reporting, and delivering all necessary reports, including the Interim report and the Final
report, administration of the Grant Agreement and the Consortium Agreement, and general risk and
ethics assessment.
The specific objectives are:
O1.1 High quality project management
O1.2 Timely and robust financial management and payments to beneficiaries
O1.3 Proactive control of contractual obligations according to the Grant agreement and Consortium
agreements
O1.4 Sound internal communications between WPs and overall, according to the project management
structure to keep participants informed and up to date
O1.5 Close interaction with the European Commission and other EU institutions, agencies, and health
policy entities
Description of work
WP1 provides the overall project coordination, project management, financial management, and risks
and ethics management. This includes arranging the online and face-to-face (hybrid) meetings, conflict
solving, and how information will be exchanged among participants.
Project leadership: The TEHDAS Joint Action Coordinator will work in close cooperation with the project
management team and WP leaders to implement this project.
Task 1.1 Project coordination
Lead partner: Sitra; Duration: M1-M30
WP1 leader leads the Project Steering Group and coordinates the project. Deliverables and milestones
are M1.1, M1.2, and M1.4.
Task 1.2 Project management
Lead partner: Sitra; Duration: M1-M30
This task includes all processes listed in chapter 9. WP1 is responsible of the monitoring and overall
execution of the project. Deliverables and milestones are D1.1, D1.2, and M1.3.
Task 1.3 Financial management and reporting
Lead partner: Sitra; Duration: M1-M30
The project has specific and clear financial management and reporting rules specified by the operating
agency of the grant. WP1 is responsible on behalf of the whole project to manage the budget, report to
the agency on the actual costs and manage project finances. Deliverables and milestones are D1.3, and
D1.4.
Task 1.4 Stakeholder cooperation and representing TEHDAS externally
Lead partner: Sitra, Duration: M1-M30
Where stakeholder engagement is distributed in thematic work packages in focus groups as well as to
Work Package 4 with a policy forum and project forum, the TEHDAS joint action needs bilateral
engagement with target policy entities listed in Chapter 3. The most evident relationship is with the
Date:
2021-06-09 22 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
European Commission and its’ operating agency HaDEA. WP1 is responsible of those relationships as
well as representing TEHDAS externally. A milestone is M1.5.
Deliverables (D) linked to this WP
D1.1 Project Management Plan (M4)
D1.2 Risk Management Plan (M4)
D1.3 Interim report (M15)
D1.4 Final report (M30)
Milestones to be reached by this WP
M1.1 Grant Agreement (M3)
M1.2 Consortium Agreement (M3)
M1.3 PSO Agreement (M3)
M1.4 Progress reports to General Assembly (M5, M15, M27)
M1.5 Stakeholder Forums (M9, M16, M28)
WP No. WP2
WP Title Dissemination of the project
Start M1 Ending month M30
Lead Sitra
Applicant # 1 Acronym Sitra PM 23
Objectives
The WP creates an identity for the project and provides the key messages to communicate about the
project which are recognisable and deliver the purpose and importance of the work. The WP will make
the deliverables and results of the project well-known among target groups during and beyond the
lifetime of the project. The project will be a relevant stakeholder in the public dialogue regarding the
European Health Data Space and especially the future of the secondary use of health data in Europe.
The specific objectives are:
O2.1 To guarantee well-coordinated and timely communication in each stage of the Joint Action and to
maximize the effective dissemination of the JA’s efforts and results.
O2.2 Create an identity for the project and a shared idea of the key messages (goals & relevance) as
basis of communication.
O2.3 Make the deliverables and results of the project well-known among target groups during and
beyond the lifetime of the project.
Date:
2021-06-09 23 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Description of work
The basis of the strategic communications plan is to identify the relevant stakeholders as explained in
Chapter 3, target groups and networks and to engage (and build trust) accordingly in collaboration with
WP4. For the communication and dissemination activities to succeed, measurable goals for these
activities will be set in the Dissemination Plan (MD2.1). Effective communications and a shared view of
the possibilities of health data is based on dialogue and engagement between the JA and different
stakeholders. WP2 focuses on public dissemination. WP4 focuses on stakeholder involvement at
operational level to share technical, scientific and political expertise within TEHDAS between policy
makers and relevant European initiatives.
Date:
2021-06-09 24 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
To measure the effectiveness and the success of the dissemination activities and the success to reach
the goals set in the beginning of the work, an on-going media analysis on the topic will be conducted as
well as systematic social media monitoring. Also citizen polls can be a relevant tool. A more detailed
stakeholder/target group analysis will be conducted in the beginning of the Joint Action but on a
general level at least following groups and channels to reach them can be identified:
Organisations and specialists working for/within TEHDAS Joint Action (Teams working space,
webpage of the JA, quarterly newsletter, materials distributed via email, regular summits, General
Assembly & online meetings, etc.)
Stakeholders generating health data, i.e. individuals as citizens and patients, healthcare providers
including primary care, hospitals, healthcare professionals, research organisations, registries, biobanks,
companies involved in wellbeing, health, and health technology industries (main channels through
which to reach them: dissemination of related deliverables via webpage and social media, newsletter,
media coverage, final report of the JA)
Stakeholders utilizing health data in the secondary use case, i.e. Health professionals, consulting and
management organizations, health industry (meetings, briefings, webpage, social media, newsletter,
media coverage, final report of the JA)
Stakeholders guarding access to and protecting data, i.e. legislators, policy makers, data permit
authorities and decision makers both on national and European level (meetings, briefings, webpage,
newsletter, media coverage, final report of the JA)
European citizens (identifying and understanding the on-going public debate on health data both on
social media channels and in traditional media, surveys, possible online-seminars etc., in close relation
to the work done in WP8)
The Tasks of the WP2 are:
Task 2.1 Plan dissemination activities
Lead partner: Sitra; Duration: M1-M30
Strategic communication including timing of the communication activities with external events such as
legal proposals from the European Commission, EU presidency events and other important external
events. TEHDAS work is very much linked to other activities which take place planned or unplanned
regardless of the timeline of our activities. Both proactive and reactive communications are needed to
support TEHDAS and EHDS. A deliverable is MD2.1
Task 2.2 Create and maintain website for the JA
Lead partner: Sitra; Duration:M1-M30
Website is of the first point of contact for stakeholders which are not in the inner circle of TEHDAS.
They must serve wide range of stakeholders and provide up-to-date and accurate information of
TEHDAS and EHDS and promote them and support the overall work. Deliverables are MD2.3 and
MD2.4.
Task 2.3 Maintain active presence and dialogue on social media and in other relevant channels Lead
partner: Sitra, Duration: M1-M30
Social media presence is not a task of a single work package or an individual such as communication
manager. However, TEHDAS will have an official social media accounts in selected social media
channels as well as social media strategy. This task is responsible of the social media presence and
dialogue and giving guidance to other project participants on how to engage stakeholders in a dialogue
related to EHDS and its targets. Deliverables and milestones are MD2.2, M2.1 and M2.2.
Task 2.4 Work packages related communications
Date:
2021-06-09 25 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Lead partner: Sitra; Duration: M1-M30
Thematic WPs have communication needs especially when a deliverable or milestone is completed.
This task supports all WPs in their communication and manages possible public consultation processes
on their behalf. Milestones are M2.4 and M2.5.
Task 2.5 Maintain contacts and direct communication
Lead partner: Sitra, Duration: M1-M30
While social media has replaced newsletters as a main communicational mechanism, newsletters and
other targeted communications still serve a purpose in summarizing the progress for stakeholders
which do not follow the project closely. A contact list of interested stakeholders is also needed to
activate stakeholders regarding events and consultations. Milestone are M2.3 and M2.6.
Task 2.6 Communication reach and tracking
Lead partner: Sitra, Duration: M1-M30
Media and social media coverage are great tools to understand both generic and specialists’ discourse
over EHDS. Understanding how our project is covered and how much visibility targeted
communications reach will enable more efficient communication and possibility to adapt key messages
if necessary. A milestone is M2.7.
Deliverables (D) land Mandatory Deliverables (MD) inked to this WP
MD2.1 Dissemination plan (M4)
MD2.2 Leaflet (M4)
MD2.3 Website (M3)
MD2.4 Layman version final technical report (M30)
Milestones to be reached by this WP
M2.1 Open Call for Stakeholders (M2)
M2.2 Quarterly newsletters (M3, M5, M8, M11, M14, M17, M20, M23)
M2.3 Stakeholder consultations (M12, M16, M18)
M2.4 Dissemination reports (M6, M12, M15, M18, M21, M24, M27)
M2.5 Dissemination activity checks with WPs (M3, M7, M11, M15, M19, M23)
M2.6 Stakeholder contact list (M3, M5, M8, M11, M14, M17, M20, M23, M29)
M2.7 Coverage metrics and follow-up (M2, M6, M10, M14, M18, M22, M26, M30)
WP No. WP3
WP Title Evaluation of the project
Start M1 Ending month M30
Lead SPMS
Applicant # 21 Acronym SPMS PM 11
Date:
2021-06-09 26 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Objectives
The success of this JA depends on the effectiveness in accomplishing defined goals and objectives. The
overall aim of WP 3 is to assess the degree to which the TEHDAS JA achieves its defined objectives and
has an impact in the target groups.
The objectives are:
O3.1 Develop a concise and structured internal evaluation plan with a focus on the general project
objectives and the specific objectives of individual WPs.
The evaluation plan will comprise three distinct components in the evaluation design: process
evaluation, output evaluation, outcome evaluation. It will include a clear description of the methods for
evaluation, indicators and measures of verification based on the specific objectives. This will ensure the
adequate framework to assess if the Joint Action is being implemented as planned and reaches its
foreseen objectives.
The internal evaluation plan will describe the rational and design of evaluation activities so that quality assurance
of deliverables is performed by partners that are not involved in the in the specific outputs/deliverables that are
being assessed/evaluated.
Also, to ensure consistency of deliverables and consistency of the quality review process (see Chapter 9.3), every
deliverable to the target group should undergo a common, predefined, quality review checklist (to be provided
to evaluators). The quality review will be incorporated as an integral part of the JA evaluation reports.
Date:
2021-06-09 27 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Description of work
Task 3.1 Develop the evaluation strategy
Lead partner: SPMS, Duration: M1-M5
The evaluation strategy will describe the rationale of project´s internal evaluation plan and will be
developed at the beginning of the JA, in close collaboration with WP1. The evaluation strategy focus
will be in defining a robust methodology to identify indicators that provide an insight into the extent to
which processes, outputs and outcomes are being realized and meet user’s needs. The evaluation plan
will outline evaluation objectives, systematic methods for collecting and measure evaluation data, what
will be evaluated, responsibilities and roles for the evaluation and the timeline of evaluation activities.
A deliverable is MD3.1.
Task 3.2 Conduct evaluation activities
Lead partner: SPMS, Duration: M5-M24
WP3 will verify and assess how the delivered inputs (i.e. deliverables) of the Action have satisfied the
needs and expectations of the target group and how the JA coordination has achieved MS
involvement, dissemination, and sustainability of project results. The evaluation activities will focus on
the main target group but also on the performance of the WPs delivering input. WP3 will further
analyse the impact of the work done by WP4-WP8 on the main priority areas defined in the JA.
Evaluation methods and tools will be defined for data to be collected from WPs, WP leaders and
relevant participants (as applicable) as well as from target group representatives. A milestone is M3.1.
Task 3.3. Analyse evaluation data
Lead partner: SPMS, Duration: M5-M30
WP3 will collect and analyse data and perform evaluation of the JA at regular intervals. The key
deliverables will be continuously monitored, and results presented in the interim evaluation report and
the final evaluation report. The interim evaluation report will give special attention to deviation from
the timeline of the project plan. The final evaluation report will focus on the registry of milestones and
deliverables achievement by each WP, including the quality of outputs. It will engage stakeholders in
the analysis of gathered evidence to justify conclusions and ensure use of lessons learned.
To ensure consistent quality of deliverables this WP will support, in collaboration with WP 1, a quality
assurance framework to ensure every deliverable for the target group will undergo a predefined
revision before approval by the Project Steering Group. To ensure quality in legal or technical aspects,
this work may engage external matter experts in the revision panel. Deliverables and milestones are
MD3.2, MD3.3, M3.2 and M3.3.
Deliverables (D) and Mandatory Deliverables (MD) linked to this WP MD3.1
Evaluation plan (M5)
The Evaluation Plan will define the design and timeline of project´s evaluation activities. MD3.2
Interim evaluation report (M16)
The interim evaluation report will assess the intended outcomes, outputs, and the success indicators in
the mid-term.
MD3.3 Final evaluation report (M30)
The final evaluation report will draw on the interim evaluation report to provide the results of the
evaluation, with concluding remarks to the entire JA.
Date:
2021-06-09 28 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Milestones to be reached by this WP
M3.1 Evaluation tools and templates (M9)
M3.2 Draft interim evaluation report (M12)
M3.3 Draft final evaluation report (M28)
WP No. WP4
WP Title Outreach, engagement and sustainability
Start M1 Ending month M27
Lead Sciensano
Applicant # 1 3 6 12 16 21 22 24
Acronym Sitra Sciensano MZCR OKFŐ DHIR IPHS NIJZ SEHA
“Batut”
PM 8 29 3 4 5 1 5 4
Objectives
The aim of this Work Package is, in close collaboration with all Work Packages, to outreach and engage
national and international players, for TEHDAS to reflect their needs and expectations, and to explore
views on its economic sustainability as well as to suggest concrete ways to integrate the results into the
future EHDS.
The objectives are:
O4.1 Provide an overview of national health data developments which include a reflection on needs and
expectations at national and international level to allow alignment of TEHDAS’ activities,
O4.2 Create a solid base for regular exchange and support for current and future EHDS activities, O4.3
Explore views of the value that could be created to share secondary data across Europe and EHDS
O4.4 Propose a sustainability plan with a roadmap for further EHDS implementation.
Date:
2021-06-09 29 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Description of work
Task 4.1 Mapping countries expectations through country visits
Lead partner: Sciensano; Partners: MZCR, OKFŐ, DHIR, RS, NIJZ, SEHA, DoH-IE (HRB), OKFŐ (SU)
Duration: M1-M24
Through (virtual) country visits, a mapping is carried out to provide an overview of national health data
developments and statuses, building on the Assessment of the EU Member States’ and other
participating countries’ rules on health data in the light of GDPR report. Some countries have developed
national health data hubs others have indicated interest in developing one. Making use of the diversity
in Europe, a selection of countries in different stages of development and different health systems will
be visited. The visits will allow to reflect on needs and expectations at national level and reflect on how
TEHDAS and the EHDS can respond to them. MS/AC authorities and stakeholders will be mobilised and
involved in the process providing an opportunity to exchange views. It will also provide an opportunity
to familiarise TEHDAS to various stakeholders in the field. A subtask will respond to national needs put
forward during the mapping exercise and respond by facilitating short targeted online training courses
in collaboration with identified initiatives and projects in Task 4.2, which serves the capacity building
needs in countries. WP leaders will be involved by providing an overview of what MS/AC authorities can
expect from TEHDAS and will be engaged by providing input on what the mapping tool should include
for their WP. Deliverables and milestones D4.1 and M4.1.
Task 4.2 Policy and Project Forum to integrate in national and international landscape
Lead partner: Sciensano; Partners: Sitra, MZCR, DHIR, NIJZ, SEHA, SEHA (PHAS), DoH-IE (HRB). Duration:
M1-M27
To be integrated in the national and international landscape, it is key to engage with national and
international stakeholders and initiatives. Two different levels of interaction are needed: policy level
and project level. At policy level, MS/AC national authorities and international organisations will be
engaged through a Political Forum. The progress of the different WPs will be presented and potential
routes for sustainable interaction will be sought. At project level, connectivity with European initiatives
and projects will be sought to build TEHDAS on previous projects. In preparation, a mapping exercise will
be carried out to identify relevant initiatives TEHDAS. This includes, amongst others, BRIDGE
Health, the Joint Action on Health Information (InfAct) PARENT, JASEHN, eHAction, eHDSI, the Health
Research and Innovation Cloud, the European Open Science Cloud and the Population Health
Information Research Infrastructure, the 1+ Million Genomes initiative, ELIXIR, Global Alliance for
Genomics and Health GA4GH.org. These initiatives will be invited to participate to the Project Forum to
share relevant outputs, to build on previous findings and to discuss potential synergies to avoid
duplication.
The Fora will bring key initiatives together, build on what has been done and strive towards making
outcomes interoperable. Four Policy and Project Forum will be organised back to back in close
collaboration with the WP leaders. As part of Task 4.2 and building on Task 4.1, this task will explore
views on the value of sharing secondary data across Europe, potentially through an EHDS and ideas how
to distribute the value (co-)created through EHDS. One of the Policy and Project Forum will be used to
discuss this topic. The views and experience of MS/AC national authorities and international projects
will be collected. Deliverables and milestones D4.2 and M4.2.
Task 4.3 Sustainability plan
Lead partner: Sitra; Partners: Sciensano, MZCR, OKFŐ, DHIR, OKFŐ (SU); Duration: M1-M24
In close collaboration with WP leaders, this task will develop a sustainability plan which considers also
economic needs in setting up the EHDS; business models of designated agencies will be discussed in
WP5. The sustainability plan will be a pragmatic approach to a roadmap providing recommendations on
Date:
2021-06-09 30 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
future implementation of EHDS. It will pay timely attention to policy proposals on EU data spaces and
consider their evolving implementation, if necessary, an interim version of the plan will be provided.
Date:
2021-06-09 31 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
The sustainability plan will include outputs from each of the WPs including the results from the country
visits. Task 4.3 will also map early on which existing data infrastructures can be leveraged on and could
be building blocks of EHDS and assess how they could potentially be linked. Deliverables and milestones
D4.3 and M4.3.
Deliverables linked to this WP
D4.1 Country fact sheet (M24)
A fact sheet from each country visit will be provided providing an overview of the mapping exercise.
D4.2 Policy and Project Forum Report (M27)
The Policy and Project Forum Report provides the minutes and conclusions of the meetings. D4.3
Sustainability plan (M24)
The sustainability plan will provide a pragmatic approach to a roadmap providing recommendations on
future implementation of EHDS. It will provide the outputs of the different WPs and recommendations
on how they can be taken up at national and international level.
Milestones to be reached by this WP
M4.1 Template of mapping tool and Expressions of Interest (M6)
In close collaboration with all WPs leaders a template will be developed for the country visit mapping
tool. It will provide the key topics that will be mapped through the exercise and describe the process for
the country visits. A call for expression of interest will be launched to select countries for the mapping
exercise based on the TEHDAS consortium.
M4.2 Policy and Project Forum (M4, M9, M16, M26)
M4.3 Mapping of the existing infrastructures to build on (M8)
WP No. WP5
WP Title Sharing data for health
Start M1 Ending month M24
Lead SEHA (Lead), VWS (Co-lead)
Applicant # 1 2 3 4 5 6 7 8 9
Acronym Sitra ATNA Sciensan CH MoH- MZC RM MoSA FR-HDH
o IF CY R
PM 4 2 8 3 0 4 4 1 11
Applicant # 10 11 12 13 14 15 16 17
Acronym BMG 6th Y. OKFŐ DoH-IE MINS SAM- DHIR ATRM
PE. AL LT
PM 0,5 2 5 1 3 4 2 1,5
Applicant # 18 19 20 21 22 23 24 25
Acronym VWS MoHNO SPMS IPHS NIJZ IACS SEHA NHSC
“Batut”
Date:
2021-06-09 32 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
PM 15 3 6 1 4 8 16 4
Objectives
Overall objective is: Setting options for the operational framework and governance models for the
exchange and secondary use of health data between European countries, respecting the principles of
transparency, trust, FAIRness*, citizen empowerment and common good.
Specific objectives are:
O5.1 Define and develop the evidence base for the secondary use of health data in EHDS, user
perspectives.
O5.2 Enable cross-border exchange and secondary use of health data through
guidelines/recommendations for European countries when planning national legislation.
O5.3 Create guidelines for an organizational framework for cross-border exchange of personal health
data based on a single point of access model connecting centralized as well as decentralized systems in
the EHDS and support national capacity building.
O5.4 Develop options for governance models for the EHDS and support national capacity building.
Date:
2021-06-09 33 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Description of work
The initial work is based primarily on two overarching perspectives. The first one is the userperspective,
here limited to the scientific researchers’ and the policy-makers’ perspectives. The second perspective is
the one of the data permit authority, however since data permit authorities may not be present as such
in all European countries, we herein name these designated bodies health data access “permitters” and
“providers.” In some European countries, the permitter and provider of health data for secondary use
can be the same body.
The perspectives of the permitters/providers from different countries are compiled to map and
characterize the interpretation of GDPR, and the challenges in the application of policy and regulation.
The analyses of the perspectives feed into the parallel work of forming a governance model for EHDS, by
first defining preliminary elements for this.
The work will be conducted according to an iterative process of two cycles, one cycle per year of the
TEHDAS program. All four tasks will in principle start from the beginning of the programme, and feed
into each other resulting in options for preliminary elements for governance models to be delivered at
the end of the first cycle. These elements will then be tested against the users and the
permitters/providers, followed by a finetuning and anchoring process engaging most of the relevant
stakeholders. Eventually they will be transformed into proposed options for governance models.
The work of WP5 includes regular dialogue with other TEHDAS work packages (e.g. WP4, WP6, WP7),
and the outcome of WP5 will feed into these as well, and in some cases vice versa.
Task 5.1 Define and develop the evidence base for the secondary use of health data in EHDS, user
perspectives
Task lead: Sciensano; Partners: MZCR, 6YPE, SAM-LT, MoH-NO (FHI), SPMS, IPHS “Batut”, NIJZ, IACS,
SEHA, NHSC, DoH-IE (HRB), MoSA, NHSC (WSI), ATRM, MoH-CY; Duration: M1-M13
Task 5.1 aims to define and develop the evidence for secondary use of health data by identifying data
sharing practices across Europe, to provide information to the European Health Data Space and the
European Commission’s legislative proposals. This task involves three steps. Step one is to conduct a
focused literature review to identify the barriers to cross-border sharing of health data for secondary use,
for non-personal health data and personal health data under the GDPR following a rapid review
methodology. Step two is to develop and set the framework for national and cross-border use cases (i.e.
case studies) based on the literature review findings and prioritisation analysis. These use cases will map
pan-European data flows focusing specifically on the user perspective. They will explore the purpose,
requirements and type of data focusing on i) scientific research and innovation and ii) policy making (incl.
regulatory) for public health purposes. In step three, an analysis of the literature review, stakeholder
Date:
2021-06-09 34 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
engagement and use cases will help to identify and to evidence best practices for sharing data between
European countries. The results will be complied as a report (D5.1) with scientific research and innovation
(M5.1) and policy making (M5.2) use cases included as an annex. The task outputs will also inform other
Work Packages, Tasks and Deliverables including Work Package 4 (T4.1) (D4.1) and Work Package 5 (T5.2)
(T5.3) (D5.2) (D5.3) (D5.4).
Task 5.2 Enabling the secondary use of data by aligning the interpretation of GDPR
Task lead: SEHA; Partners: CHIF, MZCR, RM, OKFŐ, MINSAL, SAM-LT, DHIR, VWS, NIJZ, DoH-IE (HRB),
CHIF (CHIP), ATRM, MoSA, MoH-CY, OKFŐ (SU); Duration: M1-M22
This task initiates partially from the analysis of use cases in Task 5.1. to provide a multi-national and
eventually Pan-European health data access permitters'/providers' perspective on the interpretation of
GDPR in relation to secondary use (including cross-border data exchange). It provides permitters' and
providers' perspective, and legal interoperability.
The work includes a mapping of the different national designated bodies having the function as health
data access permitters and/or providers, with the aim of forming the conditions for future multilateral
constructive networking. Information and knowledge from previous studies (e.g. the EUHealthSupport
Study) will be supplemented with necessary surveys and interviews to provide a Pan-European
permitters'/providers’ perspective. This includes economical sustainability aspects in the form of
business models of the different designated bodies (thereby relating e.g. to WP4).
A compilation of collected information will result in Milestone M5.3, thereby displaying a collected
image of the situation in several member states when it comes to regulation and administration of
health data for secondary use. This material will then be further processed and analysed in order to
provide the foundation for the Deliverable 5.2, in the form of a Recommendation/Guidelines for all
concerned European countries when planning national legislation on secondary use of health data.
The outcome of this task will feed mainly into task 5.4, thereby contributing to legal interoperability in
relation to EHDS. Deliverables and milestones are D5.2 and M5.3.
Task 5.3 Best practises for EU-cross border sharing of personal health data
Task lead: FR-HDH; Partners: Sitra (THL/Findata), VWS, IACS, FR-HDH (Inserm), FR-HDH (UT3); Duration:
M1-M24
In order to identify best practices for EU-cross border sharing of personal health data (permitters'
perspective and organisational interoperability), the four participating countries in this task offer a
variety of solutions suitable for differing situations and the necessary level of maturity to be considered
as a good practice. The subtasks will focus on the description of steps in accessing individual-level data
for national and EU researchers in a selection of centralised (FIN, FR) and decentralised systems (NL, ES)
and the establishment of a framework of a bi- or multilateral partnership agreement between structures
responsible for the secondary use of health data. On this basis, use cases for cross-border collaborations
for the secondary use of health data in centralised and decentralised systems will be identified, for
example using the case of rare diseases. Recommendations for best practices for EU cross-border
exchange including data access and data permit processes in different national settings will be
elaborated and tested in an EU-wide workshop, paying attention to be realistic at different levels of
maturity across Europe.
Specific external legal expertise will be needed for the establishment and implementation of the
bilateral partnership agreement. Such expertise requires knowledge of the legal framework cross border
research collaborations and EU law which is not available internally.
Deliverables and milestones are D5.3, M5.4, M5.5., M5.6.
Task 5.4 Developing options for governance models for the EHDS
Task lead: VWS; Partners: Sitra, ATNA, Sciensano, CHIF, RM, OKFŐ, MINSAL, MoH-NO, SPMS, IACS,
SEHA, NHSC, CHIF (CHIP), RM (CDEU), BMG, NHSC (WSI), OKFŐ (SU); Duration: M1-M19
Date:
2021-06-09 35 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
This task will provide a synthesis of the other tasks of WP5, resulting in preliminary elements for
governance models at the end of the first iterative cycle. The preliminary elements consider also
horizontal governance for Data Spaces and clarifies health specific aspects in governance. Eventually, at
the latter part of the second iterative cycle, final options for governance models for the EHDS.
Task 5.4 works towards a deliverable that sets out options for governance models based on federated
collaboration considering both centralised and decentralised solutions. It is a culmination resulting from
an iterative process of selecting and integrating content of the mapping and identification exercises
performed in other tasks under WP 5 (primarily T5.2).
Deliverables and milestones are D5.4, M5.7, M5.8.
Deliverables linked to this WP
D5.1 Report on secondary use of health data through European case studies (M13)
This deliverable will present best practices identified in European case studies on the secondary use of
data to inform the European Health Data Space. This document will summarise on a multinational level
the conclusions the respective user categories included (scientific researcher and innovator, and
policymaker respectively). The document will also consolidate the analysis results of the literature
review, use cases and stakeholder consultation. The use cases will be presented in an annex to the
document.
D5.2 Guidelines/Recommendations for European countries when planning national legislation on
secondary use of health data (M22)
This deliverable is a document presenting basic guidelines/recommendations intended to facilitate the
planning (and implementation) of national legislation on secondary use of health data.
These guidelines/recommendations are in turn based on a documented summary on a multinational
level of the experiences and conclusions of pioneering European countries that already have a national
legislation of this kind, in combination with the needs of other European countries in this respect.
D5.3 Recommendations for best practices for EU cross-border exchange including data access and data
permit processes in different national settings (M24)
In order to identify best practises for EU-cross border sharing of personal health data this deliverable will
focus on the description of steps in accessing individual-level data for national and EU researchers in a
selection of centralized and decentralized systems and the establishment of a framework of a
partnership agreement between structures responsible for the secondary use of health data. On this
basis, use cases for cross-border collaborations for the secondary use of health data in centralized and
decentralized systems will be identified. Recommendations for best practices for EU cross-border
exchange including data access / data permit processes in different national settings will be elaborated
and tested in an EU-wide workshop.
D5.4 Options for governance models for the EHDS (M19)
This deliverable is a document presenting well-established options for governance models for the EHDS,
taking into consideration a Pan-European perspective in combination with the best interest of the
concerned stakeholders in general and the citizen.
Milestones to be reached by this WP
M5.1 Use cases: Scientific research and innovation (M5)
Identify and develop the use cases to represent the diversity of research user groups across Europe. The
data collection will include and compile information regarding user purposes, requirements, type of data
Date:
2021-06-09 36 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
through an analysis of use cases, previous relevant studies, and stakeholder consultation. This milestone
considers analysis of data on a spectrum of identifiability.
M5.2 Use cases: Policymaking for public health purposes (M5)
Identify and develop the use cases to represent the diversity of policy makers across Europe. The data
collection will include and compile information regarding purposes, requirements, type of data through
an analysis of relevant case studies, previous relevant studies, and stakeholder consultation. This
milestone considers analysis of data on a spectrum of identifiability.
M5.3 GDPR interpretations in the secondary use of health data in different member states and other
participating countries (M6)
Data collection concluded and compiled regarding health data access permitters and providers in the
different MS regarding GDPR interpretations based on the use cases above.
M5.4 Description of steps in accessing individual-level data for national and EU researchers in a selection
of centralized systems and decentralized systems (M12)
M5.5 Guideline document for a peer-to- peer and cross-border partnership for the secondary use of
health data (M12)
M5.6 Compilation of best practices for EU cross-border exchange including data access and data permit
processes in different national settings (M24)
M5.7 Analysis of health specific governance aspects for an EHDS (M5)
M5.8 Analysis of the capacity of existing EU structures and options on how the governance aspects
defined in M5.7 can be made within the current structures or with new structures (M7)
WP No. WP6
WP Title Excellence in data quality
Start M1 Ending month M24
Lead IACS (Lead), RM (Co-lead)
Applicant # 1 2 3 5 7 9 12 14 18
Acronym Sitra ATNA Sciensano MoH-CY RM FR-HDH OKFŐ MINSAL VWS
PM 7 2 2 0 13 10,5 4 4 2
Applicant # 19 20 23 24 6
Acronym MoH-NO SPMS IACS SEHA MZCR
PM 4 7 30,75 2 1
Objectives
WP6 will be providing solutions for the trustworthy secondary use of health and health care data with a
view to fostering the digital transformation of the European health systems.
This overarching objective will be developed throughout two operational objectives:
O6.1 Developing the EHDS data quality assurance framework for a secondary use of real-world health
data.
O6.2 Developing the EHDS Semantic Interoperability framework
From the perspective of information users and data producers, data are deemed of quality if data
faithfully depict the real-world construct that it aims at representing.
For the TEHDAS JA, the real-world construct has to do with the digital transformation of the health
systems in Europe, that must rely on the secondary use of massive data; thus, data routinely collected by
Date:
2021-06-09 37 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
multiple data holders and controllers in multiple sites throughout the European Union. The secondary use
of health data, beyond the legal, governance and ethical questions, has as the main challenge to ensure
that data collected and stored for different purposes is accurate to provide high-quality real-world
evidence and by this means, inform national and European decision-making processes in a trustworthy
and timely manner. In addition, the increasing use of sophisticated methodologies (for example,
development of pragmatic trials, the use predictive machine learning or exploratory artificial intelligence
approaches) creates also new demands on data quality.
In that sense, the secondary use of real-world data (RWD) requires a quality assurance framework, but
also guidance on what methods and techniques has been proved reliable to ensure the production of
accurate evidence; thus, it will be needed to explore what methods and techniques allow the mitigation
of data incompleteness and missingness, how to achieve semantic interoperability, how to reach over
time data consistency, or conduct unbiased analyses.
Notably, excellence in the secondary use of real-world data should fit-for-purpose; so, data quality must
be responsive to the needs of the different information users. So, policy makers (e.g., in their role of
planning and financing), regulators (e.g., in their legislative role), health technology assessment agencies
(e.g., as regulators for the approval of high-value technologies), insurers (e.g., in the role of services
purchasers), providers (e.g., pursuing the delivery of high-quality services), patients (e.g., as beneficiaries
of the health system), citizens (e.g., as active agents for health promotion), the health industry in Europe
(e.g., in their role of producers of high-value goods and services) and researchers (e.g., in their role of
producers of real-world evidence). WP6 developments will have to be consistent with the architectural
design in WP7 (i.e.., a peer-to-peer federated infrastructure whose nodes are of a different nature
(member states, other participating countries, cross-national institutions, research infrastructures) and
with the need of translating the data quality framework into a legal proposal.
Description of work
T6.1 Develop the EHDS Data quality assurance framework (DQAF)
Date:
2021-06-09 38 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Task leader: RM, Partners: Sitra (THL), ATNA, Sciensano, FR-HDH, OKFŐ, MINSAL, SPMS, IACS, RM
(CDEU), FR-HDH (Inserm), FR-HDH (AMU), DoH-IE (HRB), OKFŐ (SU); MoH-NO (Hdir) Duration: M1-M24
Subtask 6.1.1: Assessment of DQAF good practices.
Partners involved: RM, Sitra (THL), ATNA, Sciensano, FR-HDH, OKFŐ, MINSAL, SPMS, IACS, RM (CDEU),
FRHDH (Inserm), FR-HDH (AMU), DoH-IE (HRB), OKFŐ (SU).
This task will analyse the implementation of DQAF and data quality policies in the context of P2P
federated infrastructures. Though not exclusively, features to analyse in those experiences will be: the
quality of metadata, anonymization and pseudonymization methods, conditions for the use of synthetic
data, solutions for the treatment of missingness and incompleteness, data heterogeneity, solutions for
the reuse of semi-structured and unstructured data, or methodologies on data visualization and
preanalytic metrics. Special attention will be paid to high-profile methods such as comparative
effectiveness studies, predictive machine learning and deep learning techniques.
Out of this analysis, T6.1 DQAF will detail data entry requisites (dimensions such as accuracy, coherence,
timeliness, consistency and trustfulness), some of them legally bound, and provide recommendations on
data quality governance (e.g., how to include new data sources, how to ex ante check data quality or
when data should be audited).
For the purposes of this task a scoping review on those more relevant DQAF experiences will be carried
out. Secondarily, in-depth interviews will be conducted with the coordinator of such experiences. In
addition, a review on the current legislation of health data quality frameworks will be also conducted.
For the purposes of this task a scoping review on those more relevant DQAF experiences will be carried
out. Secondarily, in-depth interviews will be conducted with the coordinator of such experiences. In
addition, a review on the current legislation of health data quality frameworks will be also conducted.
Subtask 6.1.2 Assessment of existing European legislation.
Partners involved: RM, Sitra (THL), ATNA, Sciensano, FR-HDH, OKFŐ, MINSAL, SPMS, IACS, RM (CDEU),
FRHDH (Inserm), FR-HDH (AMU), DoH-IE (HRB), OKFŐ (SU).
European legislation regulating the use of data models and encoding systems (e.g., INSPIRE) will be
retrieved and analysed. In addition, a scoping review on methodologies for the adequate use of RWD will
shed light on the discovery of quality issues in original datasets; (e.g. outlier values, anomalous
distributions, risk -of multidimensionality, heterogeneity, etc.). Deliverables and milestones referred to
task 6.1 are D6.1 and M6.1
T6.2 Develop the EHDS Semantic Interoperability Framework
Date:
2021-06-09 39 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Task leader: IACS, Partners: Sitra (THL), ATNA, RM, FR-HDH, OKFŐ, MINSAL, MoH-NO (E-helse),
SPMS, SEHA, FR-HDH (Inserm), FR-HDH (HCL), FR-HDH (ANS), BMG (Gematik), VWS(Nictiz), OKFŐ (SU),
MZCR, E-helse-NO; Duration: M3-M20
Inspired by the Refined eHealth European Interoperability Framework (ReEIF) this task will explore
semantic interoperability to harmonize the semantic integration of health data and metadata from any
relevant data source into the EHDS according to FAIR principles. Legal and organizational interoperability
is developed in WP5 and technological interoperability in WP7.
T6.2 is composed of two subtasks to cope with this objective are:
Subtask 6.2.1: Assessment of existing Common Data Models for P2P federated infrastructures.
Partners involved: IACS, Sitra (THL), ATNA, RM, FR-HDH, OKFŐ, MINSAL, MoH-NO (E-helse), SPMS, SEHA,
FR-HDH (Inserm), FR-HDH (HCL), FR-HDH (ANS), BMG (Gematik), VWS(Nictiz), OKFŐ (SU),
A scoping review meant to analyse data models and encoding systems proven suitable for P2P federated
infrastructures (e.g., InSite (EHR4CR, EHR2EDC), TriNetX, OHDSI, EHDEN, INFACT JA, PARENT JA, BBMRI,
ELIXIR, EU Platform for RD registration, ERNJP RD, S); this analysis will map out national and
international standards for semantic harmonization (e.g., SNOMED CT, LOINC, ICD, NOMESCO, CIAP,
ORPHACODES, etc.) and common data models (e.g., OMOP); and, A link with the X-ehealth JA will be
ensured.
Subtask 6.2.2: Development of a EHDS semantic interoperability framework.
Partners involved: IACS, Sitra (THL), ATNA, RM, FR-HDH, OKFŐ, MINSAL, VWS(Nictiz), MoH-NO (E-helse),
SPMS, SEHA, FR-HDH (Inserm), FR-HDH (HCL), FR-HDH (ANS), BMG (Gematik), VWS(Nictiz), OKFŐ (SU),
MZCR
A subtask that aims the development of the EHDS semantic interoperability framework compliant with
FAIR principles and common data model (CDM) in accordance with those data sources available in the
federation for secondary use. A workshop with TEHDAS competent authorities will be conducted to reach
a consensus on the final EHDS common data model. Deliverables and milestones are D6.2 and M6.2.
Deliverables linked to this WP
D6.1 EHDS data quality assurance framework (M12, M24).
The deliverable will contain two types of contents: 1) the requisites for the inclusion of data in the EHDS,
including semantic interoperability; among those, the document will identify those features that could be
legally bound; and 2) guidance on how to get data included in the EHDS, including requisites for data
interoperability (i.e., data model and encoding systems) and recommendations for data quality
governance. In Month 24, D6.1 will be upgraded with the EHDS sematic interoperability framework
delivered in Month 20.
D6.2 EHDS Semantic interoperability framework (M20)
The deliverable will propose a semantic interoperability framework for the EHDS including the common
data model for the EHDS. (NB T6.2 links with WP5 as the semantic interoperability framework is a key
feature of the governance of a federated infrastructure. Its deliverable should also link with WP7 as the
CDM is the underlying layer supporting part of the services envisaged).
Milestones to be reached by this WP
M6.1 Identification of those features that could be legally bound and provide advice to the European
Commission (M9)
M6.2 Identification of relevant encoding standards and data models for semantic harmonization (M12)
WP No. WP7
Date:
2021-06-09 40 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
WP Title Connecting the dots
Start M1 Ending month M24
Lead IACS
Applicant # 1 2 3 5 6 7 9
Acronym Sitra ATNA Sciensano MoH-CY MZCR RM FR-
HDH
PM 19 3 5 0 2 3 1
Applicant # 12 14 19 20 23 24
Acronym OKFŐ MINSAL MoH-NO SPMS IACS SEHA
PM 5 3 3 8 45,5 3
Objectives
This work package will detail the technical options to provide an effective secondary use of health data
through the EHDS. In this way, these solutions represent the technical interoperability elements of the
EHDS, according to the European Interoperability Framework.
The key concept for the envisaged EHDS is a federated peer-to-peer system, that interconnect node of
different typologies (data permit authorities, European level health data providers, research
infrastructures, data altruism bodies etc.). The EHDS nodes will operate regularly in an independent
manner, providing services to their users, but as part of the federation they will be connected. The
interconnection will be implemented through a series of specific EHDS services deployed on to provide
federation-wide features, such as: announcement, authentication, data discovery, data retrieval, data
analytics, etc.
Work package deliverables will consist of the catalogue of required and advanced services to be
implemented in the nodes aiming to join the EHDS and the options for the architecture and the
infrastructure elements required for an effective deployment of the services.
WP objectives are:
O7.1 Study existing initiatives on secondary use of health data focusing on the requirements for their
deployment
O7.2 Foster the participation of future users of the EHDS and EHDS implementers on MSs, institutions
or industry, to participate in the co-design of the services for secondary use of health data as well to
provide architecture and infrastructure options.
O7.3 Define the options for the EHDS services for secondary use of health data.
O7.4 Detail the architecture and infrastructure options of the EHDS services for secondary use of health
data, fully compliant with legal frameworks and with total guarantee of privacy and security.
Date:
2021-06-09 41 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Description of work
Task 7.1 Technical and operational expertise of existing initiatives of data sharing and secondary use of
health and biomedical data
Task lead: Sitra (CSC) Partners: ATNA, SPMS, IACS, FR-HDH. Duration: M1-M10.
Inquire and gather existing knowledge on public and/or private initiatives on data sharing and the
secondary use of health and biomedical data.
Selection of the data sharing initiatives to be analysed. The selection criteria will be to cover a wide
typology of the data sharing initiatives (national data hubs or permit authorities, data sharing
repositories from health services, European Reference Networks, and other regional, national, or supra-
national institutions or initiatives of special interest, etc.). No more than 15 data sharing initiatives are
expected to be analysed. The selection will be coordinated with WP5 Task 4.2 and Task 5.3. Partners
involved: Sitra (CSC), IACS.
Gather specific information for each of data sharing initiatives selected. Technical information elements
to be gathered: services offered, architecture, software solutions and the specific infrastructure
requirements derived for each element (computing, storage, and connectivity). Operational information
gathered: number of sustained users, overall usage, infrastructure providers, etc. Organisational
information gathered: mission, scope, international dimension, etc. Quality of service information
gathered: Use of standards, Provenance, Customer service, Training, etc. Other aspects will be defined
during the Project development. Partners involved: Sitra (CSC), ATNA, SPMS, FR-HDH.
The output of this task will be the technical and operational analysis report with the aforementioned
information. The analysis report will serve to aid in the design of the services to be described in Task 7.3
and to aid in the proposal of architecture and infrastructure options to be described in Task 7.4. A
milestone is M7.1. Partners involved: Sitra (CSC), ATNA, SPMS, IACS, FR-HDH.
Task 7.2 WP7 Permanent Advisory Group
Task lead: Sitra (VTT), Partners: MINSAL, SPMS, IACS, SEHA, DoH-IE (HRB), SEHA (NBHW), FR-HDH.
Duration: M01-M24.
Set up a Work Package permanent Advisory Group, WPAG, to drive the engagement of future users of
the EHDS (researchers, policymakers, etc.) as well as the technical implementers (public or private
companies, institutions, etc.) in the co-design and validation of the services and architecture options.
Partners involved: Sitra (VTT), IACS.
Determining the users and implementers participants of the WPAG that will be later contacted with an
open call as described in chapter 8.2. This activity will be conveyed tightly with WP2 and WP4, to ensure
an effective dissemination of call for participation to potential participants.
Set up of thematic workshops (services, architecture, infrastructure, etc.). During the initial period of the
joint action will be focused on capturing the demands, while during the last period of the joint action will
be focused on validating the options proposed. Due to the uncertainty caused by the Covid-19
pandemics, it is expected that the workshops will be mostly in virtual format, complemented by a
dedicated interaction dashboard in the Joint Action webpage, where users and implementers will provide
their feedback “offline” after the participation in the workshops. Partners Involved: Sitra (VTT), MINSAL,
SPMS, IACS, SEHA, DoH-IE (HRB), SEHA (NBHW), FR-HDH.
This task will produce three different options: 1) a report on EHDS services expectations, to be used as
input for Task 7.3; 2) a report on architecture and infrastructure expectations and experiences, to be
used as input for Task 7.4; and 3) a validation report on the proposed services and architecture and
infrastructure solutions, to be included in the final deliverable of the current WP. Milestones are M7.2,
M7.3 and M7.4. Partners involved: Sitra (VTT), IACS
Task 7.3 Definition of services for secondary use of data within the EHDS
Date:
2021-06-09 42 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Date:
2021-06-09 43 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Task lead: IACS. Partners: Sitra (CSC), Sciensano, MZCR, FR-HDH, OKFŐ, MINSAL, OKFŐ (SU) Duration:
M01-M18.
Description of the services to be implemented in the federated nodes that will support the secondary
use of health data within the EHDS, in an incremental manner. Initial set of services will cover required
features for basic operation (announcement, authentication, data discover, etc.). A second set of services
will cover advanced features (data analytics, data visualization, etc.). Further sets will focus on how to
steer health data resource development (e.g. improving adherence to FAIR principles). This tier scheme
is intended to facilitate the incorporation to the EHDS depending on the level of maturity of the
participating nodes or enabling nodes to join later if the requirements are not met.
Analysis of the services’ requirements from the Joint Action call expectations; WP5 inputs (business
cases, usage patterns, legal and institutional interoperability); the WP6 inputs (data quality framework;
semantic interoperability); WP8 (citizens engagement); and expertise gathered in Task 7.1 and Task 7.2.
Partners Involved: IACS, Sitra (CSC), FR-HDH, OKFŐ, OKFŐ (SU).
Design of the EHDS services for secondary use of the data as an Application Programme Interface (API).
It includes name of the service, input parameters, service outputs and the error codes to audit service
problems. Service validation protocol will be also provided aligned with WP5 options for governance
models, to admit new nodes to the federation. Task 7.2 Forum will be aid in terms of validation and
adjustment on the services design with users, in an iterative manner. Partners Involved: IACS, Sitra
(CSC), FR-HDH, OKFŐ, OKFŐ (SU).
The outputs of this task will be the catalogue of the EHDS services for secondary use of health data,
accurately described as an API, and the services including the tier of complexity categorization. The
catalogue will also include the users and implementers validation suggestions. The catalogue will be
used in Task 7.4 to propose the architecture and infrastructure options and will be included in the final
deliverable of the WP. Deliverables and milestone are D7.1 and M7.5. Partners: IACS, Sitra (CSC),
Sciensano, MZCR, FR-HDH, OKFŐ, MINSAL, OKFŐ (SU).
Task 7.4 Options for EHDS architecture and infrastructure of the EHDS services’ deployment
Task lead: IACS. Partners: Sitra (VTT), ATNA, Sciensano, RM, OKFŐ, BMG (FDZ), RM (CDEU), OKFŐ (SU),
FR-HDH. Duration: M09-M24.
To provide specific options for the architecture and the infrastructure that will support the deployment
of the EHDS services among participating nodes. This task will use as inputs the outputs of three earlier
tasks, especially Task 7.1, about the existing solutions deployed in existing data sharing initiatives, and
the service catalogue described in Task 7.3. This task will also consider specific requirements of the
governance models studied in WP5, data quality elements described in WP6 and citizen engagement
elements analysed in WP8.
Specification of the services designed in Task 7.3. It includes the actors involved (users, data permit
authorities, data holders, etc.) and the interaction flows between them (sequence of actions to provide
a service). Partners involved: IACS, Sitra (VTT), FR-HDH, OKFŐ, OKFŐ (SU).
Description of the options for the specific architecture and infrastructure that will support them. This
includes the technological substrate of the federation including types of nodes expected in the federation
(regular nodes, super nodes, directory nodes, etc.), computational capacities of the nodes,
communication protocols to be used to set up and maintain the connectivity in the federation, storage
capacities of the nodes, networking capacities of the federation, etc. As for the services’ options,
architecture and infrastructure options will be categorized in complexity tiers to ease its adoption.
Description of the options for the software solutions to be used in the federation. Partners involved:
IACS, Sitra (VTT), OKFŐ, OKFŐ (SU).
In close collaboration with WP6, there will be analysed solutions to for data security, data privacy
through pseudonymisation and anonymisation requirements and data administration and management
activities, including the specific elements enablers of the FAIR principles. The software layer will rely
extensively on Connecting Europe Facility (CEF) Building Blocks (eID, eDelivery) and, in all cases, open
Date:
2021-06-09 44 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
standards and open software solutions will be the prime alternative to be proposed. Partners involved:
IACS, Sitra (VTT), OKFŐ, OKFŐ (SU), MoH-NO, BMG (FDZ), RM (CDEU).
This task will also have a direct linkage with implementers via the Task 7.2 Forum, in terms of validation
and adjustment on the architecture and infrastructure options, in an iterative manner.
The outputs of this task will be the architecture and infrastructure options to support EHDS services for
secondary use of data. The architecture and infrastructure options will also include the implementers
validation suggestions. The options will be a fundamental part of the overall WP deliverable.
Deliverables and milestones are D7.2 and M7.6. Partners involved: IACS, Sitra (VTT), ATNA, Sciensano,
RM, OKFŐ, MoH-NO, BMG (FDZ), RM (CDEU), OKFŐ (SU), FR-HDH.
Deliverables (D) linked to this WP
D7.1 Options for the minimum set of services for secondary use of health data in the EHDS (M12)
Document containing the API of services options required to be deployed in MS or other institutions
wanting to join the EHDS federation for the basic operation of the EHDS.
D7.2 Options for the services and services architecture and infrastructure for secondary use of data in
the EHDS. (M24)
Document containing the API of the service options for basic and advanced EHDS operation, as well as
the options for the architecture and infrastructure that will sustain the actual deployment of the
services in MS or other institutions wanting to join the EHDS.
Milestones to be reached by this WP
M7.1 Technical and operational analysis report of existing data sharing and/or secondary use initiatives
in health and biomedical sciences. (M8)
M7.2 Report on EHDS services users’ expectations. (M9)
M7.3 Report on EHDS architecture and infrastructure implementers’ expectations / experiences. (M16)
M7.4 Validation report on the proposed services and architecture and infrastructure solutions. (M22)
M7.5 Catalogue of the EHDS services for secondary use of health data. (M10)
M7.6 Report on architecture and infrastructure options to support EHDS services for secondary use of
data. (M22)
WP No. WP8
WP Title Citizens
Start M1 Ending month M24
Lead FR-HDH, OKFŐ
Applicant # 1 3 4 5 6 9 12 19 25
Acronym Sitra Sciensano CHIF MoH- MZCR FR-HDH OKFŐ MoHNO NHSC
CY
PM 5 17,5 4 0 1 19 23 2 14
Date:
2021-06-09 45 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Objectives
WP8 will provide evidence for decision-makers and healthcare professionals in the European Union so
that they can more effectively promote the secondary use of health data and the acceptance thereof by
citizens. Health data may indeed contribute to health promotion, disease prevention, fostering healthy
lifestyles and development of innovative, efficient and sustainable health systems – as well as protecting
EU citizens from serious cross-border health threats and facilitating access to high quality, safe
healthcare for EU citizens. WP8 will do so by identifying citizen perceptions and attitudes on health
data, ways of engaging citizens around their health data, defining data altruism practices in the EU, as
well as identifying key features, conditions, and determinants of integrating health related data
captured and shared by individuals and data altruist organizations, in close alignment with the Data
Governance Act. In order to achieve this goal, WP8 has the following specific objectives:
O8.1 Obtain a better understanding of citizens' perception towards the sharing of their health data in a
European perspective.
O8.2 Improved citizen capacity to engage with data and improve citizen trust in data sharing: identify
ways to better inform citizens better about the use of their health data including data portability and
raise awareness, sensitize around innovation, and promote the role of citizens as actors of innovation.
The design and implementation of this objective will be underpinned by equality and diversity principles.
O8.3 Better understand tools of change management to empower citizens and enable them to become
actors of health data.
O8.4 Improve policymaking and facilitate decisions on which data generated and held by citizens can be
used, how and by whom for the public good and interest (scientific research, public health, sustainable
healthcare systems) purposes in a manner compliant with GDPR.
O8.5 Strengthen the health data governance mechanisms at the EU level and in the Member States and
other participating countries relevant for cross-sector data use and for data use in the common sectoral
data spaces, by involving citizens, in line with the FAIR principles considering the developments and
decisions of other health sector-specific stakeholders, authorities, agencies and care providers or
researchers, as well as the input from other TEHDAS work packages (5,6 and 7).
Date:
2021-06-09 46 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Description of work
Task 8.1 Preparatory phase of online consultation in three pilot countries
Task leader: FR-HDH, Partners: Sciensano, NHSC, FR-HDH (UT3), NHSC (WSI); Duration: M1-M10
Preparatory phase of online consultation in three pilot countries, including a pan-European qualitative
assessment with literature review and interviews on stakeholders’ and citizens’ perceptions of health
data. Develop common research protocol. Conduct extensive desk research and a comprehensive
literature review on health data perception as well as pedagogical material. Conduct 15-20 interviews by
country with public and private stakeholders of the healthcare system and patient representatives in
pilot countries to assess their experiences / opinions on citizens’ perception of the use of health data.
Conduct detailed interview analysis for each country. Consolidate interview results. Issue summary
report of findings. Develop health-data related affirmations and a questionnaire for consultation forum.
Translate material or each country. A milestone is M8.1.
Task 8.2 Conduct online consultation to collect citizens’ perceptions
Task leader: Sciensano; Partners: FR-HDH, FR-HDH (UT3), NHSC, NHSC (WSI) Duration: M1-M17
Conduct online consultation to collect citizens’ perceptions on a set of health-data related affirmations
and questionnaires to be integrated with pedagogical material. Extract, consolidate and compare results
across countries. - Launch procurement. Design and set up consultation platform, integrating
questionnaires, affirmations, and interactive engagement tools. Plan and conduct communication
campaign in collaboration with WP2 to launch consultation platform and to encourage citizen
Date:
2021-06-09 47 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
participation. Launch and monitor consultation pl platform. Conduct extraction, analysis, consolidation,
and comparison of results. Publish results as part of a communication campaign, at EU and national
levels. A milestone is M8.2.
Task 8.3 Develop recommendations for the EHDS to ensure citizen sensitization and engagement with
health data
Lead: FR-HDH, Partners: Sciensano, NHSC, NHSC (WSI), FR-HDH (UT3) Duration: M18 - M24
Conduct 1 workshop/ focus groups per country to discuss results and develop recommendations.
Consolidate recommendations for each country. Organize one EU-wide multi-stakeholder workshop to
discuss results and develop recommendations for the EHDS (TEHDAS stakeholders, patient associations
etc), as an annex to an existing conference, e.g. HIMSS 2022 or TEHDAS events. Develop draft final
recommendations document for the EHDS. Deliverables and milestones are D8.1 and M8.3.
T8.4 Overview of national data altruism definitions and systems
Task leader: OKFŐ, Partners: Sitra, CHIF, MZCR, MoH-NO (Hdir), CHIF (CHIP), OKFŐ (SU); Duration M1M7
In this task, information and learnings delivered by the Study referred to in Chapter 5, will be integrated
and matched with findings of a literature review carried out by the Member States, and other
participating countries, aiming to map options, use cases and good practices how data altruism can
increase effectiveness of data governance structures and functions of primary and secondary use of
citizens’ health and health-related data across Europe. Identified data types for use cases in altruism:
clinical data (EHR, etc.), research data, consumer data (wearables, mobile health, direct to consumer
genetics/DNA tests). Also, citizen science based on data sharing is possible.
The task will co-operate with task 8.1-8.3 to receive additional information through the interviews,
questionnaire, and survey to assess citizens’ and stakeholders’ perception of the sharing of health data.
The task will provide an initial set of:
• Overview for definitions of data altruism for the future EHDS.
• How data altruism / data altruism bodies need to be considered in EHDS governance (link to
WP5)
• Identification of good practices and risks for implementing data altruism practices and how data
altruism helps health data access points or other health data governance structures involving
citizens.
• Findings how requirements for consent and accessibility are dealt with by different types of data
altruism practices. (incl. identification of potential barriers and opportunities) Milestone is M8.4.
Task 8.5 Recommend ways to foster GDPR-compliant data altruism mechanisms for the EHDS
Task leader: OKFŐ; Partners: Sitra, CHIF, NHSC, NHSC (WSI), CHIF (CHIP), OKFŐ (SU), MoH-NO; Duration
M8-M24
The task will organise EU-wide multi stakeholder online workshops, in the frame of Work Package
Permanent Advisory Group meetings, to discuss new definitions, good practices of data altruism and
altruism structures and functions for the future EHDS. Workshops will be focused on the key use cases.
Results of the workshops will be extracted, analysed, and consolidated by the contributors of the task.
Results will be disseminated as part of an important communication campaign by newsletters, online
conferences, and a winter/summer school event. Experiences and learnings of the communication
campaign will be introduced and taken into consideration in the final report delivered by the task.
The task will provide a final report (D8.2.) including recommendations how to
• share lessons learned to be applied for the GDPR-compliant application of data altruism
practices,
Date:
2021-06-09 48 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
• adopt and harmonize identified good practices and implement use cases for the construction of
national or European health data spaces.
Deliverables and milestones are D8.2, M8.5 and M8.6.
Deliverables (D) linked to this WP
D8.1 Qualitative study conducted amongst key stakeholders (public, private actors, and patient / citizen
groups) to assess citizen’s perception of health data (M24)
D.8.2 Report on lessons learned to be applied and recommendations for data altruism practices in the
implementation of construction of national and European health data spaces (M24)
Milestones to be reached by this WP
M8.1 Literature review of citizen’s perception of and engagement with health data in Europe (M10)
M8.2 Publication of results from comparative overview of citizen’s perception of and engagement with
health data in selected countries: Belgium, France, UK(M17)
M8.3 Publication of recommendations the European Health Data Space to ensure citizen sensitization
and engagement with health data (M24)
M8.4 Presentation of a first set (catalogue) of data altruism definitions, use cases and findings about
consent and accessibility issues (means of verification: catalogue approved by stakeholders;) (M7)
M8.5 Publication of an overview (prepared to launch a communication campaign) about the results of
EU-wide multi stakeholder workshops, with a special regard to updated definitions, needs, solutions,
experiences, and good practices of data altruism (altruism structures and functions) for the future EHDS
(means of verification: published in TEHDAS webpage;) (M15)
M8.6 Recommendations to foster GDPR-compliant data altruism mechanisms for the EHDS (means of
verification: report;) (M16)
Date:
2021-06-09 49 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
7.3 Timetable and Milestones
Table 2 Project timetable as a GANTT chart
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Date: 2021-06-09 42 / 82 Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Table 3 Project milestones
M# WP Leading Acceptance Delivery Month
No. Applicant criteria
M1.1 WP1 Sitra Signed M3
M1.2 WP1 Sitra Signed M3
M1.3 WP1 Sitra Signed M3
M1.4 WP1 Sitra Delivered M5, M15, M27
M1.5 WP1 Sitra Arranged M9, M16, M28
M2.1 WP2 Sitra Arranged M2
M2.2 WP2 Sitra Sent M3, M5, M8, M11, M14, M17, M20, M23
M2.3 WP2 Sitra Arranged M12, M16, M18
M2.4 WP2 Sitra Delivered M6, M12, M15, M18, M21, M24, M27
M2.5 WP2 Sitra Done M3, M7, M11, M15, M19, M23
M2.6 WP2 Sitra Updated M3, M5, M8, M11, M14, M17, M20, M23, M29
M2.7 WP2 Sitra Checked M2, M6, M10, M14, M18, M22, M26, M30
M3.1 WP3 SPMS Delivered M9
M3.2 WP3 SPMS Delivered M12
M3.3 WP3 SPMS Delivered M28
M4.1 WP4 Sciensano Delivered M6
M4.2 WP4 Sciensano Arranged M4, M9, M16, M26
M4.3 WP4 Sitra Delivered M8
M5.1 WP5 Sciensano Delivered M4
M5.2 WP5 Sciensano Delivered M5
M5.3 WP5 SEHA Delivered M6
M5.4 WP5 FR-HDH Delivered M12
M5.5 WP5 FR-HDH Delivered M12
M5.6 WP5 FR-HDH Delivered M24
M5.7 WP5 VWS Delivered M5
M5.8 WP5 VWS Delivered M7
M6.1 WP6 RM Delivered M9
M6.2 WP6 IACS Delivered M12
M7.1 WP7 Sitra Delivered M8
Date: 2021-06-09 53 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
M7.2 WP7 Sitra Delivered M9
M7.3 WP7 Sitra Delivered M16
M7.4 WP7 Sitra Delivered M22
M7.5 WP7 IACS Delivered M10
M7.6 WP7 IACS Delivered M22
M8.1 WP8 FR-HDH Delivered M10
M8.2 WP8 Sciensano Delivered M17
M8.3 WP8 FR-HDH Delivered M24
M8.4 WP8 OKFŐ Delivered M7
M8.5 WP8 OKFŐ Prepared to M15
launch a
communication
champaign
M8.6 WP8 OKFŐ Delivered M16
8 DELIVERABLES
Table 4 Project deliverables and mandatory deliverables
No. WP Lead Deliverable content Disseminati Deliver
No. on Level y
D1.1 WP1 Sitra Project Management Plan CO M4
D1.2 WP1 Sitra Risk Management Plan CO M4
D1.3 WP1 Sitra Interim Report PU M15
D1.4 WP1 Sitra Final Report PU M30
D3.1 WP3 SPMS A document that outlines the design and CO M5
timeline of project´s evaluation activities.
D3.2 WP3 SPMS A report that assesses process, output, and CO M13
outcome indicators in the mid-term.
D3.3 WP3 SPMS A report that provides the results of the JA CO M24
evaluation, with concluding remarks.
D4.1 WP4 Sciensano A fact sheet from each country visit will be PU M24
provided providing an overview of the
mapping exercise.
D4.2 WP4 Sciensano The Policy and Project Forum Report PU M27
provides the minutes and conclusions of
the meetings.
Date: 2021-06-09 54 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
D4.3 WP4 Sitra The sustainability plan will provide a PU M24
pragmatic approach to a roadmap
providing recommendations on future
implementation of EHDS. It will consider
the outputs of the different WPs and
recommend how they can be taken up at
national and international level.
D5.1 WP5 Sciensano This deliverable is a document which PU M13
summarizes on a multinational level the
conclusions regarding the purposes,
requirements, type of data etc of the
respective user categories included
(scientific researcher and innovator, and
policymaker respectively). The use cases
are presented in an annex to the document.
D5.2 WP5 SEHA This deliverable is a document presenting PU M22
basic guidelines/recommendations
intended to facilitate the planning (and
implementation) of national legislation on
secondary use of health data.
D5.3 WP5 FR-HDH This deliverable is a document presenting PU M24
recommendations for best practices for EU
cross-border exchange including data access
/ data permit processes in different national
settings will be elaborated.
D5.4 WP5 VWS This deliverable is a document presenting PU M19
well-established options for governance
models for the EHDS, taking into
consideration a Pan-European perspective
in combination with the best interest of the
concerned stakeholders in general and the
citizen.
D6.1 WP6 RM The deliverable will contain the requisites PU M12,
for the inclusion of data in the EHDS, M24
including semantic interoperability, and the
guidance on how to get data included in
the EHDS, including requisites for data
interoperability and recommendations for
data quality governance.
D6.2 WP6 IACS The deliverable will propose a semantic PU M20
interoperability framework for the EHDS
including the common data model for the
EHDS.
Date: 2021-06-09 55 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
D7.1 WP7 IACS Document containing the API of basic PU M12
services options required to be deployed in
MS or other institutions wanting to join the
EHDS federation for the basic operation of
the EHDS.
D7.2 WP7 IACS Document containing the API of the service PU M24
options for basic and advanced EHDS
operation, as well as the options for the
architecture and infrastructure that will
sustain the actual deployment of the
services in MS or other institutions wanting
to join the EHDS.
D8.1 WP8 FR-HDH Based on the analysis of citizens’ perception PU M24
of health data in three pilot countries, this
deliverable aims to provide
recommendation son how to better
consider and engage citizens in the future
European Health Data Space.
D8.2 WP8 OKFŐ A report that provides the PU M24
recommendations for data altruism
practices.
MD2.1 WP2 Sitra Dissemination plan CO M4
MD2.2 WP2 Sitra A summary leaflet promoting the project PU M4
MD2.3 WP2 Sitra The Project website summarizing the PU (and CO) M3
project objectives and progress.
MD2.4 WP2 Sitra A summary of the outcomes, including main PU M30
results, achievement, benefits. The booklet
is written for the interested public.
MD3.1 WP3 SPMS A plan for the evaluation activities, including CO M5
indicators, data sources, methods, and
stakeholder analysis.
MD3.2 WP3 SPMS Interim evaluation report PU M16
MD3.3 WP3 SPMS Final evaluation report PU M24
9 PROJECT MANAGEMENT
9.1 Methods
The project management in a project such as TEHDAS which involves 25 countries and multiple
organisations within each country requires specific structures and methods. Many of the
traditional project management methodologies nor more recent agile project management are
not suitable for European Joint Actions. JAs are characterised by multiple stakeholders which do
not work full time in project, yet all partners contribute to a wide range of deliverables in
multiple work packages which are each lead by different people in multiple countries.
Date: 2021-06-09 56 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
TEHDAS aims to follow good practises in project management which are widely recognised but
adjusted to the needs of the project. TEHDAS utilizes the European Commission PM2 project
management tools and processes. Where possible the processes are named according to PM2
for clarity. Besides PM2 the TEHDAS project management methods can be identified to fall into
a category of Integrated Project Management (IPM).
IPM is often used in project which is implemented by multiple teams are which depend on each
other and which deliverables are interlinked. This is very much the case in TEHDAS. In TEHDAS
the main project document is this project plan which set the objectives, task, and deliverables
as well as project team and responsibilities. While the plan is commonly agreed the challenge
throughout the project is communication and keeping the direction. The processes described in
chapter 9.3 are key to keep the project focused and reactive to changes.
9.2 Governance, Roles, Responsibilities
Figure 4 TEHDAS Governance General Assembly
General Assembly, GA, is an event where all project beneficiaries meet face to face in a yearly
meeting. GAs will take place on Q2 2021, Q2 2022 and Q2 2023. Additional virtual GAs may be
organized on Q4 2021 and Q4 2022 if needed. During the GAs, all WPs will present their
outcomes and report on the progress. Beside the WPs, the Coordinator will report on overall
progress, budget, and inform of necessary amendments to the budget as well as Consortium
agreement changes.
Project Steering Group
Project Steering Group, PSG, is responsible of aligning different WPs and their activities and
outcomes. PSG is chaired by the Coordinator and it meets regularly on monthly basis. PSG also
meets during GA meetings and twice a year face-to-face (Q1 and Q3). Monthly meetings have a
standard structure where WP leads will inform PSG on the WP progress using progress report
template. Potential risks will be identified and discussed, and actions can be taken in the PSG.
PSG can also make executive decisions on budgetary changes which do not need Consortium
Agreement or Grant Agreement changes and are allowed by HaDEA rules. Such decisions can for
example be transfer of budget from one budget line to another. Work Packages
The work of the Joint Action is done in Work Packages (WPs), which are explained in detail in
Chapter 7 in this document. A WP is a major subdivision of the proposed action and holds a set
Date: 2021-06-09 57 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
of coherent tasks grouped together to facilitate the project management. Each WP has a WP
lead which leads and manages the WP and reports of its progress to the Project Steering Group.
A WP might have more than one lead or a co-lead.
Project Support Office
The Project Support Office (PSO) provides services, which facilitate project management. In this
Joint Action these are simple support functions such as organizing meetings, scheduling
meetings, collecting, analysing, and reporting on project progress, maintaining a central project
data and information repository and monitoring adherence to agreed working methods. The
PSO does not help only the Coordinator but also each WP lead can use the services of the PSO.
The PSO supports in keeping coherent structure and language in the project outputs.
Work Package permanent Advisory Group
The Work Package Permanent Advisory Group, WPAG, is a group consisting of external
stakeholders such as patient organisations or other non-profit NGOs, industry associations,
technical experts, healthcare organisations, university hospitals, other health programme
project representatives or other stakeholder experts. The WPAGs are permanent and started at
the suitable time of the work of the WPs. They are expected to provide knowledge and support
for the WP in the substance work. WPAGs meet on the invitation of the WP lead together with
other WP members in a WP meeting or on a separate meeting. An WPAG member does not have
access to WP working space but a dedicated WPAG working space where WP members and
WPAG members can exchange knowledge and draft deliverables. Besides providing expertise
and knowledge, WPAGs can bring wider acceptance to the WP work as stakeholders are involved
in a dialogue with WP members.
The WPAGs are a means to involve stakeholders in the WP work and are always started on the
decision by the PSG at the suggestion of the WP lead. Not all WPs have a WPAG.
In the beginning of the TEHDAS Joint Action an open call for participation in WPAGs and the
Stakeholder Forum will be launched. Organisations interested in taking part in WPAGs will
choose which WPs they want to contribute to and justify their participation. WP leads will
suggest to the PSG the choice of the organisations based on pre-set criteria. The goal is to give
equal opportunity for participation and to involve wide range of stakeholders in the WPAGs.
WP4 will focus on involving two stakeholder groups: policy makers and international projects
relevant to TEHDAS. The Policy Forum will bring together Ministries of Health and Ministries of
Research to inform them about the plans, progress, and outputs of the project. Input will also
be requested on their views on the added value of having an EHDS and sharing data across
Europe. The Project Forum has similar aims but focusses on existing projects relevant to TEHDAS.
The Project Forum will connect the relevant players to the WPs leads to assure TEHDAS builds
on existing knowledge and expertise. Stakeholder Forum
Stakeholder Forum, SF, is an event where external stakeholders can follow the Joint Action
progress and discuss with the participants on the issues linked to it. The SF takes place after the
General Assembly and is organised by the Coordinator together with WP4. SF is open for any
stakeholders but is limited with capacity and requires registration. The SF is expected to be
organised in Q2/2021, Q2 2022 and Q2 2023. The Coordinator will make a proposal to the PSG
on the composition of the SF based on the open call for interest. Meetings
TEHDAS aims at offering an online participation possibility to all meetings to increase
effectiveness, reduce travel time constraints and broaden participation. Further, many meetings
will be organised online only. The capability of partners to participate online will be paid special
attention.
Meetings will be conducted, and their documentation provided in English.
Date: 2021-06-09 58 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Observers
The Commission, and on invitation other EU institutions and agencies, may participate to
TEHDAS meetings as observers. The observers have a right to speak in the meetings. If an
observer wants to present a specific topic to a meeting it needs to be agreed before the meeting
with the chair of the meeting and added to the agenda of the meeting. The observers do not
have voting rights in TEHDAS meetings, and the participation is not reimbursed from the project
budget. Observers have access to the TEHDAS working space to view the working documents,
meeting minutes and other relevant documents.
9.3 Processes & Artefacts
Processes and Artefact are adjusted from the European Commission PM2 into the needs of the
TEHDAS Joint Action.
The key processes in TEHDAS project management are change management, risk
management, issue management and quality management and acceptance.
Project progress reporting
One of the main challenges in the project which involves such a variety of participants in
multiple counties is to keep track of the project progress and be able to proactively make
changes when needed. The WP1 will follow each WP through PSG meetings where standard
progress reports are required in each meeting. The WP1 will generate a project progress report
based on the WP progress report regularly to communicate the state of the project to all
participants.
The PM2 project progress report is adjusted and used as a template for WP progress reporting.
Change management
Change management for all subjects which related to Grant agreement, Consortium
agreement or project Deliverables are managed centrally within the WP1 Coordination. The
Coordination team monitors the project and can proactively launch change management
process with contract partners depending on the change needed. Changes which fall into WP1
Coordination are called Major changes. Each Major change is managed according to the
change and with the contract partner they relate to.
Minor changes in the project are for example changes in Milestones, responsible person
changes in participating organisations or work method changes which does not have an impact
to Deliverables. Minor changes are launched within WPs and taken into Project Steering group
for approval by the WP leader. PSG keeps track of approved Minor changes in change log.
Risk management
The coordination WP1 keep track of project risks in a risk log. The risk log includes identified risks
and potential response actions. The risk log is revised quarterly in the PSG meetings.
Issue management
Issues are unplanned events that might have project scope, time, cost, quality, risk, or
stakeholder satisfaction impact. Issues are managed according to their severity. Each project
partner can raise Minor issue to WP chair, and they can be managed within the WP meetings
and decisions taken logged to WP meeting minutes.
Major issues are taken to PSG meetings by the WP leaders. Major issues and the decisions
taken will be logged into Issue management log. Each major issue will have a dedicated Issue
number and can therefore be traced and referred through multiple PSG meetings.
Quality management and acceptance of project Milestones and Deliverables
TEHDAS has reporting requirements towards the European Commission. Deliverables will be
submitted for evaluation through EC Funding and Tenders portal. Prior to the submission, each
Date: 2021-06-09 59 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Deliverable will go through an internal quality review process, by a quality review team that
supports WP1 coordination activities, in collaboration with WP 3 project evaluation activities.
It is characterised as following:
1. WP leader submits a Draft Deliverable (DD) to TEHDAS internal quality review team
(QRT). The deadline is PSG -4 weeks. QRT makes a quality review of content
presentation, structure, format, and language of the DD and coherence with other
TEHDAS outputs. The purpose is to ensure consistency of different WP deliverables
and avoid minor problems that hamper PSG content evaluation and challenge project´s
relevance.
2. TEHDAS internal quality review team reports to WP leader the quality review comments,
remarks and requested changes (if applicable). The deadline is PSG -3 weeks.
3. Submission of the modified DD and QRT report to the PSG. Deadline PSG -2 weeks.
4. PSG members written comments/question regarding the DD. Deadline PSG -1 week.
5. Presentation of the DD by the corresponding WP chair in the PSG and followed by
discussion based on the written comments/questions.
6. The PSG Accepts, Accepts with minor changes, Requests major changes, or Rejects the
DD.
• If the DD is accepted with minor changes, the WP leader can revise the DD and
go ahead to process step 7.
• If major changes have been requested the corresponding WP chair can change
the DD and restart the quality review process from point number 3.
• A rejected DD cannot be taken back to PSG. The corresponding WP leader will
need to supply a plan to revise the DD and after the plan has been accepted by
the PSG and executed, a new DD can start the process from quality review
process step 1.
7. After Acceptance, the Deliverable will be submitted to an external evaluation according
to the Grant Agreement.
WP3 evaluation will do internal evaluation of the TEHDAS project as a whole and that process is
described in the evaluation plan.
Documentation and version control
Project documentation is key part of transparency.
Each official entity in TEHDAS which are named in chapter 9.2 have meetings. Official meetings
will have, and agenda and meeting minutes. They are stored in the project space and are
accessible by all participants of the TEHDAS project.
TEHDAS outputs whether Milestones or Deliverables are generated in WPs. Each output will
have multiple drafts. It is in the responsibility of the WP leader to decide which versions of
draft documents are relevant to be saved into the project space. An output shall have internal
log of change history and version history.
TEHDAS will produce documents in English but partners are free to translate them into their
national languages.
9.4 Quality & Capacity of the Partnership
Joint Actions are projects which bring European countries together. Each country which
participates in the EU health programme can appoint a Competent Authority to represent the
country in the Joint Action. In TEHDAS joint action the Competent Authorities vary three main
categories. Health ministries form the biggest category with 13 countries being represented by
their ministry of health. Second category are national health institutions with 8 countries and
the third category is formed by either regional agencies or other type of public bodies.
Date: 2021-06-09 60 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
The Joint Actions are non-competitive projects and designation is done by the ministries of
health in each country. The ministries of health are part of governments which receive their
legitimacy in democratic elections from the people. The designation of a specific institution or
their ability to act on behalf of their country cannot therefore be questioned.
The geographical coverage of participating countries is good with 25 countries. As in the
European Union Member States hold primary responsibility for organising and delivering health
services the JA partnership has 25 separate ways of managing them. That brings diversity to the
project and ensures that the outputs consider wide range of experiences all over Europe.
The designated competent authorities have added national Affiliated Entities in work packages
to bring needed expertise from specific areas of health. There are altogether 23 Affiliated
Entities including hospitals, research centres, institutes of public health and universities. These
organisations bring added value to thematic questions especially on data quality and
infrastructure domains.
9.5 Capacity of the staff to carry out the project
The responsibility of the coordination in the Join Action is with The Finnish Innovation Fund Sitra.
Sitra is an independent public fund under the supervision of the Finnish Parliament. As a fund
directly accountable to the Finnish Parliament, the decision-making processes are tied to
parliamentary systems including a supervisory board consisting of Members of the Parliament.
The health data is becoming more diverse and in the future more and more health data is
generated by individuals using wearables and home diagnostics. Another near-term trend is that
health data is merged with cross-sectoral data for new innovations and services. Sitra has been
in the centre of this change with a project called the fair data economy. Because of both the
sectoral and horizontal data knowledge Sitra is well placed to lead the planning of the European
Health Data Space.
The key resources in the project include the coordinator and work package leaders who form
the Project Steering Group. The following partners have taken the responsibility for these
functions and placed their key staff at the disposal of TEHDAS.
WP1 – Coordination: Sitra
Sitra is a future-oriented public think-do-and-connect tank that promotes sustainable well-being
and Finland's competitiveness. Sitra collaborates with partners from different sectors to
research, trial and implement bold new ideas that shape the future.
The coordinator and the WP1 leader is Markus Kalliola, MSc, from Sitra. He has vast expertise
in health data and project management including European health policy projects in the
European Commission. Markus Kalliola took part in the creation of eHDSI and setting up the
ERNs during 2013-2016 as an official in DG SANTE. From 2017-2020 he has worked in Sitra
related to the secondary use of health data in the ISAACUS-project and horizontal data policies
in the Fair data economy project.
WP2 – Dissemination: Sitra
The Joint Action’s Communications Lead and WP2’s leader is Jukka Vahti, M.A. from Sitra, where
he works as leading expert at the communications and public affairs. He has versatile experience
both in communications and journalism on societal topics. In Sitra Jukka Vahti has worked with
multiple projects in relation to renewing the Finnish healthcare system. He has also been actively
involved in ISAACUS-project on the secondary use of health data and in the IHAN-project that
aims to create the European model of fair data economy. WP3 – Evaluation: SPMS
SPMS is a State-Owned Enterprise with three major functions: the Portuguese Health Ministry
Central Purchasing, the National IT authority, and the Portuguese representative for eHealth
cross-border affairs. SPMS’s purpose is to provide shared services in the area of health and care,
Date: 2021-06-09 61 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
in order to “centralise, optimise and rationalise” the procurement within the Portuguese
National Health System.
WP3 lead is Cátia Sousa Pinto, MD, Public Health Spc. She has expertise in Health Information
Systems and worked as Head of Epidemiology and Surveillance Division in the Portuguese
General Directorate of Health where she coordinated the execution of the real-time mortality
information system in Portugal and implementation of the national electronic infectious
diseases surveillance system based on clinical and laboratory data. She was the national focal
point for ECDC and WHO for public health surveillance. Since 2018, she works at the Advanced
analytics and intelligence Unit at SPMS, Ministry of Health, in secondary use of health data and
AI strategic planning and operation activities. She has previous experience in international
collaboration in several European projects.
WP4 – Outreach, engagement and sustainability: Sciensano
Sciensano is a research institute and the national public health institute of Belgium. Sciensano's
core business is scientific research in the fields of public health, animal health and food safety.
The WP4 lead is Petronille Bogaert, MSc, MPH, PhD candidate. She is Head of the Unit EU Health
Information Systems and president of the EUPHA section on Public Health Monitoring and
Reporting. She has vast knowledge about European health information systems and project
management by coordinating three consecutive projects in health information: BRIDGE Health,
the Joint Action on Health Information (InfAct) and the Population Health Information Research
Infrastructure (PHIRI).
WP5 – Sharing data for health: SEHA and VWS
The Swedish eHealth Agency SEHA aims to contribute to improved health care, care and the
nation's health by pursuing development of a national e-health infrastructure. The activities
focus on promoting public involvement and providing support for professionals and
decisionmakers.
The Ministry of Health, Welfare and Sport is the Dutch Ministry responsible for public health,
health care, quality of life, social work and sport.
WP5 is led by Michel Silvestri from the Swedish eHealth Agency SEHA and Hanneke Landman
from Ministry of Health, Welfare and Sport in the Netherlands.
Michel Silvestri, PhD, has a background as senior lecturer at Karolinska Institutet followed by
clinical healthcare experience at managerial level, as well as policymaking of healthcare and
social care in the Stockholm region. Michel Silvestri, with wide experience of international
collaboration and of the challenges of digital transformation, is head of unit within Strategy and
Coordination of the Swedish eHealth Agency since 2019 where he is also coordinating the
Swedish efforts in the X-eHealth programme.
Hanneke Landman, MSc, is a political scientist with a background in the policy of supervision of
social health care and medical devices. She has been working as a senior policy officer at the
ministry for 4 years. She is currently working on the consent request for the exchange of medical
data and AI.
WP6 – Excellence in data quality: IACS and RM
The Institute for Health Sciences in Aragon (IACS) is the entity that promotes knowledge in
Biomedicine and Health Sciences in Aragon. The IACS carries out its activity with the expectation
of contributing to high quality care in the public health system, supporting innovation, research
of excellence and benchmark training, as well as supporting the creation of wealth and economic
growth.
The WP6 is led by Enrique Bernal-Delgado, MD PhD MPH MHecon, who currently holds the
position of senior scientist in the Institute for Health Sciences in Aragon (IACS). He leads the Data
Date: 2021-06-09 62 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Science for Health Services and Policy Research group, being their research domains of interest
the analysis of unwarranted variation in health care, the comparative effectiveness of health
care interventions and policies, and the methodological developments for an accurate use of
real-world data. With considerable experience in the leadership of national (ATLASVPM,
REDISSEC) and international research initiatives built on RWD (ECHO, ICTUS Net) he is currently
contributing to the development of research infrastructures in Europe to increase capacity in
the secondary use of health data (INFACT JA, PHIRI). See bio here https://orcid.org/0000-
00020961-3298
The WP6 is co-lead by Regional Midtjylland from Denmark.
WP7 - Connecting the dots: IACS
WP7 is led by Juan González-García, PhD, from the Institute for Health Sciences in Aragon (IACS),
Spain. Juan has developed a strong career in data analytics, simulation, and performance
analytics of parallel applications in world-class research centres such as the Barcelona
Supercomputing Center and the IBM T.J Watson Research Center. Currently he is the IACS’
Biocomputing Unit manager where he applies parallel and distributed computing fundamentals
to develop new big-data-based methodologies on real-world data analytics and exploring new
research lines on how using cognitive computing in health systems research, personalized
medicine, and personalized care.
WP8 – Citizens: FR-HDH and OKFŐ
The French Health Data Hub is a public interest group created by law in 2019. It is established
between 56 actors, as set out by ministerial decree, mostly from the public sector. Its vision is
to guarantee a transparent, easy and unified access to health data to improve the quality of care
and patient support.
National Healthcare Service Center (ÁEEK) is the largest supplier and supporter of healthcare
services in Hungary. It possesses ownership rights of state-owned Hungarian hospitals. The
institute provides operations methodology, strong management support and systemic
background to manage hospitals efficiently and perform their ultimate goals: quality, efficiency
and patient focus.
WP8 is led by Louisa Stüwe and Caroline Guillot from the French Health Data Hub (FR-HDH) and
Istvan Csizmadia from the National Healthcare Service Center of Hungary.
Louisa Stüwe, MPA, MPH, is currently in charge of international relations at the FR-HDH. Before
joining the FR-HDH, Louisa has managed strategic projects linked to the health sector, research,
and innovation, both as a consultant or in organizations such as the French Ministry of Health, a
multinational pharmaceutical company and international organizations including the World
Health Organization and the World Bank Group.
Caroline Guillot, PhD, is the FR-HDH’s director for citizen and patient association relations.
Previously, Caroline has conducted and coordinated various research projects and sociological
studies. For five years, she was Head of the Diabetes Lab of the French Diabetes Federation,
enabling patients and partners to co-construct innovations, products and services that respond
to the needs and expectations of diabetic patients and improve their quality of life.
István Csizmadia, MSc in Economics and Health Care Management (male): István leads
international programmes and projects at National Healthcare Service Centre (ÁEEK), Hungary.
He has extensive (30+ years) experience in a) Preparing, planning and managing EU funded
programmes, b) Strategic planning, c) Preparing and submitting applications for EU grant, d)
Implementing and coordinating EU projects, e) Evaluating applications and monitoring projects,
f) Generating and providing support to innovation, cluster, logistic, transport, energy,
environment and health programmes and projects, g) Working with international organizations
e.g. EU COM, EU Council, UN organizations, h) Preparing and implementing bilateral and
Date: 2021-06-09 63 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
multilateral international agreements. Since June 2018 he has been the Work Package leader of
WP5 ‘Innovative use of health data’ in eHAction. Previously he used to be the representative of
Hungary in the Programme Committee of the Third Health Programme 2014-2020 and the
Steering Group on Health Promotion, Disease Prevention and Management of
NonCommunicable Diseases (SGPP), as well as the Head of Subgroup for sharing and analysing
experiences, best practices, to build up success factors for the effective use of Structural Funds
for health investments in the Reflection Process On Modern, Responsive And Sustainable Health
Systems. He has master's degree in Health Management, professional qualification of Health
Care Manager and Economics, professional qualification of transport and logistics.
9.6 Risk Analysis and Treatment
Risks will be analysed and treated by using established methodologies for continuous project
planning, monitoring and control, especially Open Project Management Methodology OpenPM².
The Project has a clear management and reporting structure, and its deliverables include Project
Management Plan, Risk Management Plan, and Dissemination Plan. Project risks are identified,
assessed, approved and reported throughout the project and e.g. all internal disagreements and
internal and external conflicts solved as early as possible. Internal risks are related to project
management, internal communications, and consortium ability and efficiency in dealing with its
tasks and fulfilling its purposes. External risks are related to stakeholders, impacts and changes
in the society.
The Consortium Agreement will ensure that the risks on the legal side within the Consortium are
considerably low.
Table 5 Risks and their treatment
ID Risk Title/Description Likelihood Impact Proposed Risk Treatment and
(1-5) (1-5) contingency plan
R1 Ineffective coordination 2 3 Effective coordination is ensured by the
well-thought managerial structure and
transparent procedures.
R2 Ineffective overall 1 3 Effective management is ensured
management through good PMO office services.
R3 Conflicts in the 2 4 All partners are experienced and
Consortium motivated to reach the project
objectives. The management structure
is clear, the project deliverables include
Project Management Plan, Risk
Management Plan, and the
Dissemination Plan. The Consortium
Agreement will be comprehensive.
Decreasing R1 and R2 decreases R3.
Project partners are experienced with
virtual collaboration and meetings,
effective documenting and sharing.
R4 Ineffective collaboration 2 3 Project Steering group meets regularly
between WPs to mitigate this risk.
R5 Coordination problems 3 2 The coordinator, WP leaders and Task
within an individual WP leaders will monitor progress and flag
problems early enough to enable fast
mitigation.
Date: 2021-06-09 64 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
R6 Delays with deliverables 4 1 Planning within Work Packages has
distributed deliverables along the
project lifecycle. Strong project
management in place.
R7 Problems with 3 2 Subcontracting is in a small role in this
subcontracting project. Partners have extensive
experience in subcontracting.
R8 Budget overspending 1 4 Reduce: Continuous monitoring of
budgeted and actual costs.
R9 Change of key staff in the 5 1 Accept: With 8 WPs it is expected that
coordination, WP, and some exchange of persons will take
Task leaders. place. Each CA is advised to make
contingency plans for their staff.
R10 Change of requirements 5 2 Accept: New EU regulation is already in
for deliverables due process for data spaces. WPs are
external events such as adviced to make description of
new EU laws, budgets deliverables enough generic so that
changes or similar there is a room for change during the
project. If the risk materializes severely
changes in contracts might be needed.
R11 The deliverables will not 2 4 Reduce: One of the main target groups
meet the needs of the (EC) is consulted during the planning
target groups phase to mitigate the risk. Participants
and their experience are expected to
mitigate this risk towards other target
groups that cannot be consulted during
the planning phase.
R12 Lack of consensus with 3 3 WP4 aims to include external parties
and between early on into the project to assure their
stakeholders involvement, strengthening
communication and collaboration which
facilitates consensus.
Further discussion and consensus
building happens through the
stakeholder forum and WPAGs.
Adopting dialogue methods in
communication. Active stakeholder
engagement. Participatory meetings.
Clear communication e.g. not using
abbreviations.
9.7 Financial management
The Finnish Innovation Fund Sitra funds organisations and their projects and has robust routines
for reviewing project progress reports, accounting, and distributing capital according to agreed
budgets. In TEHDAS Joint Action Sitra provides an experienced Financial Officer to the project
Date: 2021-06-09 65 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
management team and will set up routines according to requirements from HaDEA and what
has been agreed in the Grant and Consortium agreements.
As stated in the Consortium agreement each Competent Authority is responsible of their own
and their Affiliated Entities reporting. As Coordinator Sitra will ensure the establishment of a
proper reporting mechanism including the reporting templates, the collection, analysis, and
evaluation of financial data from all project partners, continuous budget planning and budget
monitoring as well as required audit certificates.
In addition to what is required by HaDEA for the reporting periods, Sitra will keep up-to-date
tracking of the expenses and regularly report to the Steering committee as well as to the General
Assembly. In case of any deviations or major financial issues, Sitra will implement appropriate
solutions in accordance with the rules set out in the GA and CA. Sitra will ensure that payments
will be made to CAs according to the TEHDAS budget in this proposal and reports received during
the project according to the payment schedule agreed with HaDEA.
10 BUDGET
10.1 Content description and justification
Overall budget
Building the overall budget was a complex task. The project has 25 Competent Authorities and
multiple Affiliated Entities. Our approach towards the budget was to first agree on the substance
work packages and discuss what were the objectives, tasks, and deliverables. Only after all work
packages had a good picture of what to produce, we started the budget discussion. Firstly, we
estimated roughly how many person months each task would require. Each WP leader was
responsible of their own estimations and gave a range of necessary person months.
As in all European projects a person month costs have a wide cost difference. In our case they
vary between 2115,00 euros to 10.000,00 euros. Depending on which organizations participate
in which Work Package and Task and how the overall participation is split between countries
had an impact to the final amount of person months (PM) for the project. Our initial average
cost estimate was 5.000,00 euros for a PM. After each country had their calculations done the
final average cost was 6.500,00 euros for a PM. This required reductions in person months and
streamlining the work package tasks. The outcome is presented in the table below.
Table 6 Proposed budget and funding.
Item Budget Percentage
Direct costs
Personnel costs 3 377 745,00 81%
Subcontracting 183 000,00 4%
Travel 238 700,00 6%
Other goods and services 94 636,00 2%
Indirect costs 272 585, 67 7%
Total eligible costs 4 166 666,67 100%
Funding
EU Funding 2 500 000,00 60 %
Date: 2021-06-09 66 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Partners’ co-funding 1 666 666,67 40%
Total Funding 4 166 666,67 100%
Distribution of work
The work has been distributed to the different Work Packages as shown in the table below.
The project management is designed to be extremely focused activity with less than 10% of the
total person months. Dissemination WP2 and Outreach, engagement, and sustainability W4
are focused on having dialogue with either wider public (WP2) or more targeted stakeholders
(WP4). Together they are more than 15% of the total budget. As other WPs also contain direct
stakeholder engagement (WP7 19 PMs, WP1 5PMs) and WP8 includes citizen dialogue (44,5
PMs) the whole project could be seen very much focused on outwards rather than inwards.
The total proportion of these activities is 24% of the project budget. This is an intentional use
of budget and entails that building the European Health Data Space cannot happen in closed
group but requires engaging stakeholders broadly.
The main tangible deliverables are created in work packages 5 to 8. The size of the work
package is defined by the tasks as well as interest of participating organisations to get involved
in the work. The largest WP is the WP5 which was also most popular among participants. More
participants mean more coordination efforts as well as more fragmented work. It is also
expected that large WPs require more meetings to come into common conclusions on the
deliverables. For these reasons, the thematic Work Packages are not even in size. Table 7
Person months in work packages
Work package name Effort PM Percentage
WP1 - Coordination 50 9,48%
WP2 - Dissemination 23 4,36%
WP3 - Evaluation 11 2,09%
WP4 – Outreach, engagement and 59 11,19%
sustainability
WP5 – Sharing data for health 109 20,67%
WP6 – Excellence in data quality 89,25 16,93%
WP7 – Connecting the dots 100,5 19,06%
WP8 - Citizens 85,5 16,22%
Total 527,25 100,00%
Other costs
The personnel costs are more than 80% of the total costs.
During the pandemic, all European organizations have learned new working habits and the
creation of this project plan is one example. We have estimated less travelling than usually in
European projects as the project will rely on hybrid and online meetings regardless of the COVID
situation. With the new skills and tools to work remotely we had the courage to limit travelling
to 6% of the total costs. At minimum, each participating organization receives 6.000,00 euros
travelling budget. That is calculated to include three yearly general assembly meetings and
additional face-to-face workshop, altogether 6 meetings with 1.000,00 estimated costs each.
Date: 2021-06-09 67 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Work Package leaders have additional travelling costs, and the coordinator is expected to have
the most travelling during the project.
Table 8 Summary of meetings during the Joint Action (estimate)
Meeting Number of Number Duration Hybrid
meetings of (days) (H) or
participa online
nts (O)
General Assemblies (GA) 5 52 1,5 3H+2O
Project Steering Group (PSG) 24 20 H=1, O=0,5 3H+21O
WP Meetings 30 15 1 5H+25O
WP Workshops 5 20 1,5 H
WP Advisory groups (WPAG) 8 10 0,5 O
Policy Forum meetings 2 52 1 H
Project Forum meetings 2 20 1 H
Stakeholder Forum (SF), linked to GA 3 80 1 H
Subcontracting is also extremely limited. We estimate 4% and 183.000 euros to subcontracting.
When a task is subcontracted it is thoroughly considered. The aim of the work to be delivered is
that it represents the participating organizations and stakeholders which have participated in
the work. Subcontracting is used to tasks where expertise is not within the participants and has
been clearly defined in the detailed budget tables in chapter 10.4.
Other goods and services are 2% and contains mainly yearly General assembly meetings as well
as workshops organized by the Work Packages including facilities, catering, and other costs.
10.2 Summary of Effort
Table 9 Person months per applicant
Applicant WP1 WP2 WP3 WP4 WP5 WP6 WP7 WP8 Total PM
1-Sitra 50 23 0 8 4 7 19 5 116
2-ATNA 0 0 0 0 2 2 3 0 7
3-Sciensano 0 0 0 29 8 2 5 17.5 61,5
4-CHIF 0 0 0 0 3 0 0 4 7
5-MoH-CY 0 0 0 0 0 0 0 0 0
6-MZCR 0 0 0 3 4 1 2 1 11
7-RM 0 0 0 0 4 13 3 0 20
8-MoSA 0 0 0 0 0 0 0 0 0
9-FR-HDH 0 0 0 0 11 10,5 4 19 44,5
10-BMG 0 0 0 0 0 0 0 0 0
Date: 2021-06-09 68 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
11-6YPE 0 0 0 0 2 0 0 0 2
12- OKFŐ 0 0 0 4 5 4 5 23 41
13-DoH-IE 0 0 0 0 0 0 0 0 0
14-MINSAL 0 0 0 0 3 4 3 0 10
15-SAM-LT 0 0 0 0 4 0 0 0 4
16-DHIR 0 0 0 5 2 0 0 0 7
17-ATRM 0 0 0 0 0 0 0 0 0
18-VWS 0 0 0 0 15 2 0 0 17
19-MoH-NO 0 0 0 0 3 4 0 2 9
20-SPMS 0 0 11 0 6 7 8 0 32
21-IPHS “Batut” 0 0 0 1 1 0 0 0 2
22-NIJZ 0 0 0 5 4 0 0 0 9
23-IACS 0 0 0 0 8 30,75 45,5 0 84,25
24-SEHA 0 0 0 4 16 2 3 0 25
25-NHSC 0 0 0 0 4 0 0 14 18
Total PM 50 23 11 59 109 89,25 100,5 85,5 527,25
10.3 Third-Party Contributions
N/A
10.4 Detailed Budget
The detailed budget includes all participating organisations, regardless of their request to the
subsidy for the in-kind work to be carried out.
Some participating organisations have indicated to request no budget for their in-kind
contribution. That means that they will contribute but are not requesting budget from the
project.
Thus, some of the participants have zero in the detailed budget below for contributing to the
work (A) as well as Table 8 above but they still benefit from travel allocation (C). As they
participate in work packages, person months have been indicated in the relevant work package
tables for contribution. Each contribution has a meaning, and everyone bears a responsibility
for a specific task.
Applicant No. & Short Name #1 Suomen itsenäisyyden juhlarahasto / The Finnish Innovation Fund
Sitra (Sitra)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Project lead / coordinator 10.200,00 10 102.000,00
Date: 2021-06-09 69 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Senior lead in the field of 9.800,00 13 127.400,00
health data
Project manager 7.200,00 20 144.000,00
Communication specialist 7.200,00 23 165.600,00
Financial specialist 5.700,00 13 74.100,00
Project assistant 4.050,00 8 32.400,00
Total person Total Costs (€) for (A)
month
87 645.500,00
Justification WP1 and WP2 lead. Task lead in 4.4. Contributor in Tasks 4.2, 5.4,
8.5 and 8.6.
(B) Direct costs of Costs (€) Task(s)/Justification
subcontracting
WP2 website, video 53.000,00 Many communication activities including website
production, graphic design, creation, video streaming in general assembly meetings,
media / social media coverage graphic design to create leaflet and following media
surveillance reach metrics will be subcontracted.
Total Costs (€) of (B) 53.000,00
(C) Other direct costs
(C.1) Travel Costs (€) Justification
40.000,00 The coordination team is estimated to participate
10 events yearly with average of two participants /
meeting. An average cost of 1000 euros per
meeting. The events are WP workshops,
conferences, general assembly meetings as well as
bilateral meetings with key stakeholders including
the European Commission and other European
institutions and agencies.
(C.3) Other goods and services Costs (€) Justification
37.636,00 The costs are related to organising
meetings/conferences. There are three general
assembly meetings and three stakeholder forums.
1.000,00 Certificate on financial statements
Total Costs (€) of (C) 78.636,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 54.399,52
Total estimated eligible costs 831.535,52
Applicant No. & Short Name CSC - IT Center for Science (CSC)
Affiliated to #1 Sitra
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Date: 2021-06-09 70 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Senior expert 6220 9 55.980
Total person month Total Costs (€) for (A)
9 55.980
Justification Participation in Tasks 7.1 and 7.3
Total Costs (€) of (B) 0
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 3.918,6
Total estimated eligible costs 59.898,6
Applicant No. & Short Name Finnish institute for health and welfare (THL)
Affiliated to #1 Sitra
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert 7150 7 50050
Senior Expert 6210 3 18630
Total person month Total Costs (€) for (A)
10 68680
Justification Participation in Tasks 6.1 and 6.2.
THL/Findata participation in Task 5.3
Total Costs (€) of (B) 0
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 4807,60
Total estimated eligible costs 73487,6
Applicant No. & Short Name Technical Research Centre of Finland (VTT)
Affiliated to #1 Sitra
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert 7664 10 76.640
Total person Total Costs (€) for (A)
month
10 76.640
Justification Participation in Tasks 7.2 and Task 7.4
Total Costs (€) of (B) 0
Total Costs (€) of (C) 0
Date: 2021-06-09 71 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 5.364,8
Total estimated eligible costs 82.004,8
Applicant No. & Short Name #2 Bundesministerium für Soziales, Gesundheit, Pflege
und Konsumentenschutz (ATNA)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior level manager in the field of health 9825 3,5 34387,5
data
Expert in the field of health data 6450 3 19350
Project manager 4525 0,5 2262,5
Total person Total Costs (€) for
month (A)
7 56000
Justification Contribution in tasks 5.4, 6.1, 6.2, 7.1 and 7.4
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
6.000,00 3 yearly General assembly meetings, 3
face-to-face workshops during the joint
action.
Total Costs (€) of (C) 6.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 4.340,00
Total estimated eligible costs 66.340,00
Applicant No. & Short Name #3 Sciensano (Sciensano)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Junior scientist in the field of 6.608,20 8.954,00 40,5 20,5 267.631,92
health data 7.822,16 0,5 183.557,00
Senior scientist in the field of 3.911,08
health data
Communication specialist
Total person Total Costs (€) for (A)
month
61,5 455.100,00
Justification Lead of WP4 outreach, engagement and sustainability. Task lead
in 5.4 and 8.3. Contributor in 5.4, 6.1, 6.2, 7.3, 7.4, 8.1 and 8.3
Date: 2021-06-09 72 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
(B) Direct costs of subcontracting Costs (€) Task(s)/Justification
Citizen survey online platform 70.000 Subcontracting for a service provider and ICT support
for the online deliberative platform in task 8.2 to have
citizen dialogue. Costs include a subscription fee
for the backend of the deliberative platform, website
design and technical support.
Total Costs (€) of (B) 70.000
(C) Other direct costs
(C.1) Travel Costs (€) Justification
20.000 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
3 WP leaders’ face-to-face workshops.
Additional travel from WP4 and country visits.
(C.3) Other goods and services Costs (€) Justification
Date: 2021-06-09 73 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
15.000 WP4 Policy and project forums meetings.
Number of meetings: 4 Policy forums and 4
Project Forums.
To be integrated in the national and
international landscape, it is key to engage with
national and international stakeholders and
initiatives. Two different levels of interaction
are needed: policy level and project level. At
policy level, MS/AC national authorities and
international organisations will be engaged
through a Political Forum. The progress of the
different WPs will be presented and potential
routes for sustainable interaction will be sought.
At project level, connectivity with European
initiatives and projects will be sought to build
TEHDAS on previous projects. In preparation, a
mapping exercise will be carried out to identify
relevant initiatives TEHDAS. This includes,
amongst others, BRIDGE Health, the
Joint Action on Health Information (InfAct)
PARENT, JASEHN, eHAction, eHDSI, the
Health Research and Innovation Cloud, the
European Open Science Cloud and the
Population Health Information Research
Infrastructure, the 1+ Million Genomes
initiative, ELIXIR, Global Alliance for Genomics
and Health GA4GH.org. These initiatives will be
invited to participate to the Project Forum to
share relevant outputs, to build on previous
findings and to discuss potential synergies to
avoid duplication.
The Fora will bring key initiatives together, build
on what has been done and strive towards
making outcomes interoperable. Four Policy
and Project Forum will be organised back to
back in close collaboration with the WP leaders.
As part of Task 4.2 and building on Task 4.1, this
task will explore views on the value of sharing
secondary data across Europe, potentially
through an EHDS and ideas how to distribute
the value (co-)created through EHDS. One of the
Policy and Project Forum will be used to
discuss this topic. The views and experience of
MS/AC national authorities and international
projects will be collected.
1.000,00 Certificate on financial statements
Total Costs (€) of (C) 36.000
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 39.277,00
Date: 2021-06-09 74 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Total estimated eligible costs 600.377,00
Applicant No. & Short Name #4 Hrvatski zavod za zdravstveno osiguranje / Croatian Health
Insurance Fund (CHIF)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Lead in the field of health 2.450,00 1 2.450,00
data
Senior Expert in the field of health 2.115,00 3 6.345,00
data
Total person Total Costs (€) for
month (A)
4 8.795,00
Justification Contribution in tasks 5.2, 5.4, 8.4 and 8.5
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
3.000,00 3 yearly General assembly meetings
Total Costs (€) of (C) 3.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 825,65
Total estimated eligible costs 12.620,65
Applicant No. & Short Name Hrvatski zavod za javno zdravstvo / Croatian Institute of Public
Health (CIPH)
Affiliated to #4 CHIF
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of health 3.811,73 0,5 1.905,86
data
Expert in the field of health data 1641,65 2,5 4.104,14
Total person Total Costs (€) for (A)
month
3 6.010,00
Justification Contribution in tasks 5.2, 5.4, 8.4, 8.5
Total Costs (€) of (B) 0
(C.1) Travel Costs (€) Justification
3.000,00 3 yearly General assembly meetings
Total Costs (€) of (C) 3.000,00
(D) Indirect Costs Total Costs (€)
Date: 2021-06-09 75 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
(Max. 7% on A, B and C) 630,70
Total estimated eligible costs 9.640,70
Applicant No. & Short Name #5 Ministry of Health of the Republic of Cyprus (MoH-CY)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Total person Total Costs (€) for (A)
month
Justification WP6, 7 and 8
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
10.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
Additional travelling added because of multiple
persons involved without contribution budget.
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 700,00
Total estimated eligible costs 10.700,00
Applicant No. & Short Name #6 Ministerstvo Zdravotnictvi Ceske Republiky (MZCR)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of health 4.000,00 11 44.000,00
data
Total person Total Costs (€) for (A)
month
11 44.000,00
Justification Contribution in tasks 4.1, 4.2, 4.3, 5.1, 5.2, 6.2, 7.3, 8.4
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
6.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
Total Costs (€) of (C) 6.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 3.500,00
Total estimated eligible costs 53.500,00
Date: 2021-06-09 76 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Applicant No. & Short Name #7 Region Midtjylland / Region of Central Denmark (RM)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Level Manager 9.000,00 4 36.000 80.000
Senior Expert in the field of 8.000 10 19.998
health data Project 6.666 3
Manager
Total person Total Costs (€) for (A)
month
17 136.000
Justification WP 6 co-leader, Contribution in tasks 5.2, 5.4, 7.4
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
6.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
Total Costs (€) of (C) 6.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 9.940,00
Total estimated eligible costs 151.940
Applicant No. & Short Name Central Denmark EU Office (CDEU)
Affiliated to #7 RM
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of health 8.000,00 3 24.000,00
data
Total person Total Costs (€) for (A)
month
3 24.000,00
Justification Participation in Tasks 6.1, 5.4 and 7.4
Total Costs (€) of (B) 0
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 1.680,00
Date: 2021-06-09 77 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Total estimated eligible costs 25.680,00
Applicant No. & Short Name #8 Sotsiaalministeerium / Ministry of Social Affairs (MoSA)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior expert in the field of 0 1 0
health data
Total person Total Costs (€) for (A)
month
1 0
Justification EE will participate with 1 Person Month to WP5 in tasks 5.1 and
5.2. EE is not requesting budget and therefore the total cost is 0
euros.
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
6.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
Total Costs (€) of (C) 6.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 420,00
Total estimated eligible costs 6.420,00
Applicant No. & Short Name #9 Plateforme des données de santé / Health Data Hub (FR-HDH)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of 6.966,00 24,5 170.667,00
health data
Senior Expert in the field of 7.000,00 3 21.000,00
health data
Total person Total Costs (€) for (A)
month
27,5 191.667,00
Justification WP8 Co-leader and task lead of 8.1, Task leader in 5.3,
contribution to tasks 5.3, 6.1, 6.2, 7.3, 7.4, 8.1 and 8.2
(B) Direct costs of subcontracting Costs (€) Task(s)/Justification
Legal and other expertise linked 20.000,00 Task lead in 5.3 which requires specific external EU
to task 5.3 legal and partnership framework expertise
Total Costs (€) of (B) 20.000,00
Date: 2021-06-09 78 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
(C) Other direct costs
(C.1) Travel Costs (€) Justification
12.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
6 additional meetings as a WP leader.
(C.3) Other goods and services Costs (€) Justification
5.000,00 FR-HDH is a task lead in Task 5.3. which includes
four partners. There is estimated one workshop
between those partners. In the WP8 FR-HDH is a
WP leader and for 8.1. one workshop has been
planned. Each workshop is estimated 2.500,00
euros.
Total Costs (€) of (C) 17.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 16.006,69
Total estimated eligible costs 244.673,69
Applicant No. & Short Name Institut national de la santé et de la recherche médicale (Inserm)
Affiliated to #9 FR-HDH
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of 5000 8 40000
health data
Total person Total Costs (€) for
month (A)
8 40000
Justification Participation in Tasks 5.3 (Inserm US 14 rare disease team from
Orphanet) to provide cross-border use case for rare diseases,
significant data quality experience and input for 6.1 (Inserm US
10 Center for Epidemiology on Medical Causes of Death) to
support tasks related to the data quality assurance framework
and work on the semantic interoperability framework for 6.2
(Inserm US 14)
Total Costs (€) of (B) 0
(C) Other direct costs
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 2.800,00
Date: 2021-06-09 79 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Total estimated eligible costs 42.800,00
Applicant No. & Short Name Hospices Civils de Lyon (HCL)
Affiliated to #9 FR-HDH
(A) Direct personnel costs
Staff function Monthly Estimated Sum Cost (€)
Cost Person-month
Senior Expert in the field of 9.170 1.5 13.755
health data
Total person month Total Costs (€) for (A)
1.5 13.755
Justification Participation in Task 6.2 to bring in significant experience and
contribution to data formats, in particular OMOP
Total Costs (€) of (B) 0
(C) Other direct costs
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 962,85
Total estimated eligible costs 14.717,85
Applicant No. & Short Name UNIVERSITE PAUL SABATIER TOULOUSE III (UT3)
Affiliated to #9 FR-HDH
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of 8100 4 32.400
health data
Total person Total Costs (€) for
month (A)
4 32.400
Justification Active participation in setting up the partnership framework
agreement for task 5.3 and in-depth research on existing good
practices in crossborder health data sharing initiatives, 8.1, and
participation in 8.2 and 8.3 defining the questionnaire for the
online consultation
Total Costs (€) of (B) 0
Date: 2021-06-09 80 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 2268,00
Total estimated eligible costs 34.668,00
Applicant No. & Short Name Université Aix-Marseille (AMU)
Affiliated to #9 FR-HDH
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of 9.826 3 29.478
health data
Total person Total Costs (€) for (A)
month
3 29.478
Justification Participation in Task 6.1 for providing experience and direct
contribution to develop data visualisation framework for EHDS
Total Costs (€) of (B) 0
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 2.063,46
Total estimated eligible costs 31.541,46
Applicant No. & Short Name Agence du Numérique en Santé (ANS)
Affiliated to #9 FR-HDH
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of 8400 0.5 4200
health data
Total person Total Costs (€) for (A)
month
0.5 4200
Date: 2021-06-09 81 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Justification Participation in Task 6.2 to provide in depth-experience with for data
interoperability issues and to be a reviewer of all documentation
produced
Total Costs (€) of (B) 0
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs
(€)
(Max. 7% on A, B and C) 294,00
Total estimated eligible costs 4494,00
Applicant No. & Short Name #10 Bundesinstitut für Arzneimittel und Medizinprodukte /
Forschungsdatenzentrum, Bundesinstitut für Arzneimittel und
Medizinprodukte / Bundesministerium für Gesundheit (BMG)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of health 0 0,5 0
data
Total person Total Costs (€) for (A)
month
0,5 0
Justification BMG will contribute to tasks 5.4 with 0,50 PM. BMG has not
requesting budget from the project and therefore the total costs
is 0 euros.
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
4.000,00 3 yearly General assembly meetings, 1 face-
toface workshops during the joint action.
(C.3) Other goods and services Costs (€) Justification
Total Costs (€) of (C) 4.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 280,00
Total estimated eligible costs 4.280,00
Applicant No. & Short Name Forschungsdatenzentrum (FDZ)
Affiliated to #10 - BMG
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of health 0 0 0
data
Date: 2021-06-09 82 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Total person Total Costs (€) for (A)
month
0 0
Justification
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
3.000,00 3 yearly General assembly meetings.
Total Costs (€) of (C) 3.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 210,00
Total estimated eligible costs 3.210,00
Applicant No. & Short Name Gematik, (GEMATIK)
Affiliated to #10 - BMG
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of health 0 0 0
data
Total person Total Costs (€) for (A)
month
0 0
Justification
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
3.000,00 3 yearly General assembly meetings.
Total Costs (€) of (C) 3.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 210,00
Total estimated eligible costs 3.210,00
Applicant No. & Short Name #11 Dioikisi 6is Ygeionomikis Perifereias Peloponnisou Ionion
Nyson Ipeirou Kai Dytikis Ellades / 6th Health Region of
Peloponnese, Ionian Islands, Epirus, and Western Greece (6th Y.
PE.)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Date: 2021-06-09 83 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Senior Expert in the field of health 3.170,00 2 6.340,00
data
Total person Total Costs (€) for (A)
month
2 6.340,00
Justification Contribution in task 5.1
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
6.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
Total Costs (€) of (C) 6.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 863,80
Total estimated eligible costs 13.203,80
Applicant No. & Short Name #12 Országos Kórházi Főigazgatóságot / National Healthcare
Service Center (OKFŐ)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Lead in the field of health 3.700,00 6 22.200,00
data
Senior Expert in the field of health 3.500,00 8 28.000,00
data
Junior Expert in the field of 2.800,00 5 14.000,00
health data
Financial Specialist 2.800,00 3 8.400,00
Total person Total Costs (€) for (A)
month
22 72.600,00
Justification WP 8 Leader, Contributor in tasks 4.1, 4.3, 5.2, 5.4, 6.1, 6.2, 7.3
and 7.4.
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
6.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
6 additional meetings as a WP leader.
(C.3) Other goods and services Costs (€) Justification
Total Costs (€) of (C) 6.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 5.502,00
Date: 2021-06-09 84 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Total estimated eligible costs 84.102,00
Applicant No. & Short Name Semmelweis Egyetem / Semmelweis University, (SU)
Affiliated to #12 - OKFŐ
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Legal Expert 3.675,00 4 14.700,00
Senior Expert in the field of health 3.800,00 6 22.800,00
data
Junior Expert in the field of 2.800,00 6 16.800,00
health data
Financial Specialist 2.800,00 3 8.400,00
Total person Total Costs (€) for (A)
month
19 62.700,00
Justification Contributor in tasks 4.1, 4.3, 5.2, 5.4, 6.1, 6.2, 7.3 and 7.4.
Cooperation with OKFŐ as WP8 leader.
Total Costs (€) of (B) 0
(C) Other direct costs
(C.3) Other goods and services Costs (€) Justification
10.000,00 Workshops for T8.4 and T8.5. Two workshops
has been planned for both Tasks with 2.500,00
euros budget for each workshop.
(C.1) Travel Costs (€) Justification
6.000,00 Yearly general assembly meetings, face-to-face
workshops during the joint action
Total Costs (€) of (C) 16.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 5.509,00
Total estimated eligible costs 84.209,00
Applicant No. & Short Name #13 Department of Health (DoH-IE)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert 0 0 0
Total person Total Costs (€) for (A)
month
0 0
Justification
Total Costs (€) of (B) 0
(C) Other direct costs
Date: 2021-06-09 85 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
(C.1) Travel Costs (€) Justification
3.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 210,00
Total estimated eligible costs 3.210,00
Applicant No. & Short Name Health Research Board (HRB)
Affiliated to #13 – DoH-IE
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of health 0 0 0
data
Total person Total Costs (€) for (A)
month
0 0
Justification
(B) Direct costs of subcontracting Costs (€) Task(s)/Justification
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
3.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
Total Costs (€) of (C) 3.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 210,00
Total estimated eligible costs 3.210,00
Applicant No. & Short Name #14 Ministero della Salute (MINSAL)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of health 7.000,00 10 70.000,00
data
Total person Total Costs (€) for (A)
month
10 70.000,00
Justification Contribution in tasks 5.2, 5.4, 6.1, 6.2, 7.2, 7.3
Total Costs (€) of (B) 0
(C) Other direct costs
Date: 2021-06-09 86 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
(C.1) Travel Costs (€) Justification
6.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
Total Costs (€) of (C) 6.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 5.320,00
Total estimated eligible costs 81.320,00
Applicant No. & Short Name #15 Lietuvos Resbublikos Sveikatos Apsaugos Ministerija / Ministry of
Health of the Republic of Lithuania (SAM-LT)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of 3.200,00 4 12.800,00
health data
Total person Total Costs (€) for (A)
month
4 12.800,00
Justification Contribution in tasks 5.1 and 5.2
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
6.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
Total Costs (€) of (C) 6.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 1.316,00
Total estimated eligible costs 20.116,00
Applicant No. & Short Name #16 Ministry for Health – Government of Malta / Directorate Health
Information and Research - Ministry for Health (DHIR)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of 6.500,00 7 45.500,00
health data
Total person Total Costs (€) for (A)
month
7 45.500,00
Justification Contribution in tasks 4.1, 4.2, 4.3 and 5.2
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
Date: 2021-06-09 87 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
6.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
Total Costs (€) of (C) 6.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 3.605,00
Total estimated eligible costs 55.105,00
Applicant No. & Short Name #17 Agentia de Transplant / Transplant Agency of the Republic of
Moldova (ATRM)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of 0 0 0
health data
Total person Total Costs (€) for (A)
month
0 0
Justification
(B) Direct costs of Costs (€) Task(s)/Justification
subcontracting
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
6.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
Total Costs (€) of (C) 6.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 420,00
Total estimated eligible costs 6.420,00
Applicant No. & Short Name #18 NLNA, Ministerie van Volksgezondheid, Welzijn en Sport /
Welfare and Sports, Directorate Information Policy of the Ministry of
Health (VWS)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of 10.000,00 15 150.000,00
health data
Total person Total Costs (€) for (A)
month
15 150.000,00
Justification WP5 Co-leader, Task Lead for T5.2 and contribution to T5.1, and T5.4.
Date: 2021-06-09 88 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
(B) Direct costs of Costs (€) Task(s)/Justification
subcontracting
Legal expertise 20.000,00 Task 5.4 is expected to involve external experts in
the field of legal services for specific and focused
EU law problems for which in-house legal advice
cannot be found.
Total Costs (€) of (B) 20.000,00
(C) Other direct costs
(C.1) Travel Costs (€) Justification
9.000,00 3 yearly General assembly meetings, 3
faceto-face workshops during the joint
action.
3 additional meetings as a WP leader.
(C.3) Other goods and services Costs (€) Justification
5.000,00 Workshops in WP5. Two workshops with a
budget of 2.500,00 euros each.
Total Costs (€) of (C) 14.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 12.888,00
Total estimated eligible costs 196.880,00
Applicant No. & Short Name Stichting Nationaal ICT Instituut in de Zorg (Nictiz)
Affiliated to #18 VWS
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
(Senior) Expert in the field of 10.000 2 20.000
health data
Total person Total Costs (€) for
month (A)
2 20.000
Justification Nictiz will contribute to Task 6.2
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
3.000,00 3 face-to-face workshops
Total Costs (€) of (C) 3.000,00
(D) Indirect Costs Total Costs (€)
Date: 2021-06-09 89 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
(Max. 7% on A, B and C) 1.610,00
Total estimated eligible costs 24.610,00
Applicant No. & Short Name #19 E-helseavdelningen, The Norwegian Ministry of Health and
Care Services (MoH-NO)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of 8.000,00 1 8.000,00
health data
Total person Total Costs (€) for (A)
month
1 8.000,00
Justification Contribution in tasks 5.4
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
6.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
(C.3) Other goods and services Costs (€) Justification
Total Costs (€) of (C) 6.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 980,00
Total estimated eligible costs 14.980,00
Applicant No. & Short Name Helsedirektoratet / Norwegian Directorate of Health (Hdir)
Affiliated to #19 MoH-NO
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of 8.000,00 4 32.000,00
health data
Total person Total Costs (€) for
month (A)
4 32.000,00
Justification Hdir will contribute to Task 6.1 and 8.4
Total Costs (€) of (B) 0
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs (€)
Date: 2021-06-09 90 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
(Max. 7% on A, B and C) 2.240,00
Total estimated eligible costs 34.240,00
Applicant No. & Short Name Direktorat for e-helse / Norwegian Directorate for eHealth
(Ehelse)
Affiliated to #19 MoH-NO
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of 8.000,00 2 16.000,00
health data
Total person Total Costs (€) for
month (A)
2 16.000,00
Justification E-Helse will contribute to Task 6.2
Total Costs (€) of (B) 0
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 1.120,00
Total estimated eligible costs 17.120,00
Applicant No. & Short Name Folkehelseinstituttet / Norwegian institute for public health (FHI)
Affiliated to #19 MoH-NO
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of 8.000,00 2 16.000,00
health data
Total person Total Costs (€) for
month (A)
2 16.000,00
Justification E-Helse will contribute to Task 5.1
Total Costs (€) of (B) 0
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs (€)
Date: 2021-06-09 91 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
(Max. 7% on A, B and C) 1.120,00
Total estimated eligible costs 17.120,00
Applicant No. & Short Name #20 SPMS – Servicos Partilhados do Ministerio de Saude EPE /
Shared Services of the Ministry of Health, EPE (SPMS)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Director 7.400,00 4,0 29.600,00
Chief of office/Unit coordinator 6.000,00 6,00 36.000,00
eHealth business and technical 4.000,00 22,0 88.000,00
experts
Total person Total Costs (€) for (A)
month
32 153.600,00
Justification WP 3 leader, Contributions in tasks 5.1, 5.4, 6.1, 6.2, 7.1 and 7.2
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
6000,00 Participation in three General
Assembly meetings
Total Costs (€) of (C) 6.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 11172,00
Total estimated eligible costs 170.772,00
Applicant No. & Short Name #21 Institute za Zastitu Zoravlja Srbijedr Milan Jovanovic Batut /
Institute of Public Health of Republic of Serbia "Dr Milan Jovanovic
Batut" (IPHS “Batut”)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of 2.000,00 2 4.000,00
health data
Total person Total Costs (€) for (A)
month
2 4.000,00
Justification Contribution in tasks 4.1 and 5.1
(B) Direct costs of Costs (€) Task(s)/Justification
subcontracting
Total Costs (€) of (B) 0
Date: 2021-06-09 92 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
(C) Other direct costs
(C.1) Travel Costs (€) Justification
6.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
Total Costs (€) of (C) 6.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 700,00
Total estimated eligible costs 10.700,00
Applicant No. & Short Name #22 Nacionalni Institut za Javno Zdravje / National Institute of
Public Health (NIJZ)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of health 4.200,00 9 37.800,00
data
Total person Total Costs (€) for (A)
month
9 37.800,00
Justification Participation in Tasks: 4.1, 4.2, 5.1, 5.2.
(B) Direct costs of subcontracting Costs (€) Task(s)/Justification
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
6.000,00 3 yearly General assembly meetings, 3 face-
toface workshops during the joint action.
Total Costs (€) of (C) 6.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 3.066,00
Total estimated eligible costs 46.866,00
Applicant No. & Short Name #23 Instituto Aragonés de Ciencias de la Salud (IACS)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Data scientist 4.755,00 27 128.385,00
Senior Researcher in the field of 6.300,00 17 107.100,00
health data
Researcher in the field of health 3.400,00 17 57.800,00
data
Biocomputation responsible 5.560,00 5 27.800,00
Date: 2021-06-09 93 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
IACS JA coordinator, Policy 6.910,00 4 27.640,00
transfer coordinator
Innovation Coordinator 6.200,00 2 12.400,00
Project officer 3.500,00 12,25 42.875,00
Total person Total Costs (€) for
month (A)
84,25 404.400,00
Justification Work package leader in WP6 and WP7, Contribution in tasks 5.1,
5.3 and 5.4
(B) Direct costs of subcontracting Costs (€) Task(s)/Justification
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
15.000,00 3 yearly General assembly meetings, 3
faceto-face workshops during the joint
action. As a WP6 and WP7 leader, additional
meetings for both leaders.
(C.3) Other goods and services Costs (€) Justification
14.000,00 Workshops in WP6 and WP7
1.000,00 Certificate on financial services
Total Costs (€) of (C) 30.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 30.408,00
Total estimated eligible costs 464.808,0
0
Applicant No. & Short Name #24 E-hälsomyndigheten / Swedish eHealth Agency (SEHA)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Personmonth
Senior Lead 12.800,00 4 51.200,00
Senior Expert in the field of health 10.500,00 10 105.000,00
data
Project Manager 8.400,00 7 58.800,00
Total person Total Costs (€) for (A)
month
21 215.000,00
Justification WP Leader in WP5, contributor in tasks 4.1, 4.2, 6.2 and 7.2
(B) Direct costs of sub-contracting Costs (€) Task(s)/Justification
Legal expertise 20.000,00 Task 5.2 is expected to have needs for
external legal expertise on international and
Date: 2021-06-09 94 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
EU-specific data regulation due to lack of
inhouse legal resources.
Total Costs (€) of (B) 20.000,00
(C) Other direct costs
(C.1) Travel Costs (€) Justification
12.000,00 3 yearly General assembly meetings, 3
face-to-face workshops during the joint
action.
6 additional meetings as a WP leader.
(C.3) Other goods and services Costs (€) Justification
5.000,00 WP5 workshops. Two workshops planned
with a budget of 2.500,00 euros each.
Total Costs (€) of (C) 17.000,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 17.640,00
Total estimated eligible costs 269.640,00
Applicant No. & Short Name Folkhälsomyndigheten / Public health agency of Sweden (PHAS)
Affiliated to #24 – SEHA
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of health 7.500,00 2 15.000,00
data
Total person Total Costs (€) for (A)
month
2 15.000,00
Justification The PHAS will contribute to tasks 4.2.
Total Costs (€) of (B) 0
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 1.050,00
Total estimated eligible costs 16.050,00
Applicant No. & Short Name Socialstyrelsen / National Board of Health and Welfare (NBHW)
Affiliated to #24 – SEHA
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Date: 2021-06-09 95 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Senior Expert in the field of health 10.000,00 2 20.000,00
data
Total person Total Costs (€) for (A)
month
2 20.000,00
Justification The NBHW will contribute to tasks 7.2.
Total Costs (€) of (B) 0
(C) Other direct costs
Total Costs (€) of (C) 0
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 1.400,00
Total estimated eligible costs 21.400,00
Applicant No. & Short Name #25 The NHS Confederation (NHSC)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of health 7.450,00 4 29.800,00
data
Expert in the field of health data 7.000,00 11 77.000,00
Total person Total Costs (€) for (A)
month
15 106.800,00
Justification The NHSC will lead and coordinate the UK input to WP5 and WP8.
WP5: 5.1, 5.4
WP8: 8.1, 8.2, 8.3 and 8.5
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
4.200,00 3 yearly General assembly meetings
Total Costs (€) of (C) 4.200,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 7.770,00
Total estimated eligible costs 118.770,00
Applicant No. & Short Name Genome Research Limited / Wellcome Sanger Institute (WSI)
(Affiliated to #25 – NHSC
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior Expert in the field of health 7.000 3 21,000.00
data
Date: 2021-06-09 96 / 82
Doc Version: 1.0
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Total person Total Costs (€) for (A)
month
3 21,000.00
Justification Senior UK Expert contributing to WP 5 and WP8.
WP5: 5.1, 5.4
WP8: 8.1, 8.2, 8.3 and 8.5
Total Costs (€) of (B) 0
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.500,00 Participation on two TEHDAS workshops in WP8
Total Costs (€) of (C) 1.500,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 1.575,00
Total estimated eligible costs 24.075,00
11 PREVIOUS AND CURRENT GRANTS RELEVANT TO THE PROGRAMME
According to the guidance received from HaDEA it is not necessary to list all project by the
participants in this section. The participants in this project are mostly Ministries of Health and
public institutions which are very experienced in other EU joint actions, health programme and
H2020 projects. The applicants have been partners in several important EU project such as the
EU Health Programme Joint Action projects ADVANTAGE, CANCON, CHRODIS-PLUS, InfAct,
eHAction, EMERGE, EUnetHTA JA, EU-JAMRAI. EU-JAV, GAPP, HA-REACT, Healthy GateWays,
infACT, INTEGRATE, iPAAC, JAHEE, JAMIE, JAMS, JANPA, JARC, JAseHN, JATC, RD-ACTION, SHARP,
VISTART and X-eHealth.
Annex describes how the most relevant of these projects link to the Joint Action.
12 CURRENT APPLICATIONS RELEVANT TO THE PROGRAMME
N/A
13 EXCEPTIONAL UTILITY
N/A
14 COLLABORATING STAKEHOLDERS
Due to the short timeframe in the preparation phase the partners decided to choose
collaborating stakeholders once the project has started. The Joint Action will publish an open
call on the TEHDAS project website in the beginning of 2021. The open call will ensure equal
opportunity for all stakeholders to express their interest and elaborate their contribution to the
Joint Action. The stakeholders will have an opportunity to choose which WPs they are interested
in and to justify their participation. Contracting collaborating stakeholders at this stage would
have benefitted those who have good contacts to partners and would have not been in keeping
with the objective of engaging stakeholders broadly in the process of building the European
Health Data Space.
i
eHealth Network Refined eHealth European Interoperability Framework. Brussels, 2015.
https://ec.europa.eu/health/sites/health/files/ehealth/docs/ev_20151123_co03_en.pdf Retrieved
2020-10-14.
Date: 2021-06-09 97 / 82
Doc Version: 1.0
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
ESTIMATED BUDGET FOR THE ACTION Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Estimated eligible1 costs (per budget category) EU contribution Action's estimated receipts
Financial
B. Direct D. Indirect Reimbursement Maximum EU Maximum Income contributions
A. Direct C. Other Action’s
costs of Total costs generated given by third
personnel costs direct costs costs2 rate %3 contribution4 grant amount5 total receipts
subcontracting by the action parties to the
beneficiaries
A.1 Employees C.1 Travel
(or equivalent)
C.2 Equipment
A.2 Natural
persons under C.3 Other goods
direct contract and services
and seconded
persons
Cost form6 Actual Actual Actual Flat-rate7 7%
d=
a b c e = a+b+c+d f g=e*f h i j k=i+j
0.07 * (a+b+c)
1. Sitra 645 500.00 53 000.00 78 636.00 54 399.52 831 535.52 60.00 498 921.31 498 921.31 0.00 0.00 0.00
- VTT 76 640.00 0.00 0.00 5 364.80 82 004.80 60.00 49 202.88 49 202.88 0.00 0.00 0.00
- CSC 55 980.00 0.00 0.00 3 918.60 59 898.60 60.00 35 939.16 35 939.16 0.00 0.00 0.00
- THL 68 680.00 0.00 0.00 4 807.60 73 487.60 60.00 44 092.56 44 092.56 0.00 0.00 0.00
Σ beneficiary 846 800.00 53 000.00 78 636.00 68 490.52 1 046 926.52 628 155.91 628 155.91 0.00 0.00 0.00
2. ATNA 56 000.00 0.00 6 000.00 4 340.00 66 340.00 60.00 39 804.00 39 804.00 0.00 0.00 0.00
3. Sciensano 455 100.00 70 000.00 36 000.00 39 277.00 600 377.00 60.00 360 226.20 360 226.20 0.00 0.00 0.00
4. CHIF 8 795.00 0.00 3 000.00 825.65 12 620.65 60.00 7 572.39 7 572.39 0.00 0.00 0.00
- CIPH 6 010.00 0.00 3 000.00 630.70 9 640.70 60.00 5 784.42 5 784.42 0.00 0.00 0.00
Σ beneficiary 14 805.00 0.00 6 000.00 1 456.35 22 261.35 13 356.81 13 356.81 0.00 0.00 0.00
5. MoH-CY 0.00 0.00 10 000.00 700.00 10 700.00 60.00 6 420.00 6 420.00 0.00 0.00 0.00
6. MZCR 44 000.00 0.00 6 000.00 3 500.00 53 500.00 60.00 32 100.00 32 100.00 0.00 0.00 0.00
7. RM 136 000.00 0.00 6 000.00 9 940.00 151 940.00 60.00 91 164.00 91 164.00 0.00 0.00 0.00
- CDEU 24 000.00 0.00 0.00 1 680.00 25 680.00 60.00 15 408.00 15 408.00 0.00 0.00 0.00
Σ beneficiary 160 000.00 0.00 6 000.00 11 620.00 177 620.00 106 572.00 106 572.00 0.00 0.00 0.00
8. MoSA 0.00 0.00 6 000.00 420.00 6 420.00 60.00 3 852.00 3 852.00 0.00 0.00 0.00
Page 1 of 4
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
ESTIMATED BUDGET FOR THE ACTION Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Estimated eligible1 costs (per budget category) EU contribution Action's estimated receipts
Financial
B. Direct D. Indirect Reimbursement Maximum EU Maximum Income contributions
A. Direct C. Other Action’s
costs of Total costs generated given by third
personnel costs direct costs costs2 rate %3 contribution4 grant amount5 total receipts
subcontracting by the action parties to the
beneficiaries
A.1 Employees C.1 Travel
(or equivalent)
C.2 Equipment
A.2 Natural
persons under C.3 Other goods
direct contract and services
and seconded
persons
Cost form6 Actual Actual Actual Flat-rate7 7%
d=
a b c e = a+b+c+d f g=e*f h i j k=i+j
0.07 * (a+b+c)
9. FR-HDH 191 667.00 20 000.00 17 000.00 16 006.69 244 673.69 60.00 146 804.21 146 804.21 0.00 0.00 0.00
- Inserm 40 000.00 0.00 0.00 2 800.00 42 800.00 60.00 25 680.00 25 680.00 0.00 0.00 0.00
- HCL 13 755.00 0.00 0.00 962.85 14 717.85 60.00 8 830.71 8 830.71 0.00 0.00 0.00
- UT3 32 400.00 0.00 0.00 2 268.00 34 668.00 60.00 20 800.80 20 800.80 0.00 0.00 0.00
- AMU 29 478.00 0.00 0.00 2 063.46 31 541.46 60.00 18 924.88 18 924.88 0.00 0.00 0.00
- ANS 4 200.00 0.00 0.00 294.00 4 494.00 60.00 2 696.40 2 696.40 0.00 0.00 0.00
Σ beneficiary 311 500.00 20 000.00 17 000.00 24 395.00 372 895.00 223 737.00 223 737.00 0.00 0.00 0.00
10. BMG 0.00 0.00 4 000.00 280.00 4 280.00 60.00 2 568.00 2 568.00 0.00 0.00 0.00
- GEMATIK 0.00 0.00 3 000.00 210.00 3 210.00 60.00 1 926.00 1 926.00 0.00 0.00 0.00
- FDZ 0.00 0.00 3 000.00 210.00 3 210.00 60.00 1 926.00 1 926.00 0.00 0.00 0.00
Σ beneficiary 0.00 0.00 10 000.00 700.00 10 700.00 6 420.00 6 420.00 0.00 0.00 0.00
11. 6th Y. PE. 6 340.00 0.00 6 000.00 863.80 13 203.80 60.00 7 922.28 7 922.28 0.00 0.00 0.00
12. OKFŐ 72 600.00 0.00 6 000.00 5 502.00 84 102.00 60.00 50 461.20 50 461.20 0.00 0.00 0.00
- SU 62 700.00 0.00 16 000.00 5 509.00 84 209.00 60.00 50 525.40 50 525.40 0.00 0.00 0.00
Σ beneficiary 135 300.00 0.00 22 000.00 11 011.00 168 311.00 100 986.60 100 986.60 0.00 0.00 0.00
13. DoH-IE 0.00 0.00 3 000.00 210.00 3 210.00 60.00 1 926.00 1 926.00 0.00 0.00 0.00
- HRB 0.00 0.00 3 000.00 210.00 3 210.00 60.00 1 926.00 1 926.00 0.00 0.00 0.00
Page 2 of 4
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
ESTIMATED BUDGET FOR THE ACTION Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Estimated eligible1 costs (per budget category) EU contribution Action's estimated receipts
Financial
B. Direct D. Indirect Reimbursement Maximum EU Maximum Income contributions
A. Direct C. Other Action’s
costs of Total costs generated given by third
personnel costs direct costs costs2 rate %3 contribution4 grant amount5 total receipts
subcontracting by the action parties to the
beneficiaries
A.1 Employees C.1 Travel
(or equivalent)
C.2 Equipment
A.2 Natural
persons under C.3 Other goods
direct contract and services
and seconded
persons
Cost form6 Actual Actual Actual Flat-rate7 7%
d=
a b c e = a+b+c+d f g=e*f h i j k=i+j
0.07 * (a+b+c)
Σ beneficiary 0.00 0.00 6 000.00 420.00 6 420.00 3 852.00 3 852.00 0.00 0.00 0.00
14. MINSAL 70 000.00 0.00 6 000.00 5 320.00 81 320.00 60.00 48 792.00 48 792.00 0.00 0.00 0.00
15. SAM-LT 12 800.00 0.00 6 000.00 1 316.00 20 116.00 60.00 12 069.60 12 069.60 0.00 0.00 0.00
16. DHIR 45 500.00 0.00 6 000.00 3 605.00 55 105.00 60.00 33 063.00 33 063.00 0.00 0.00 0.00
17. ATRM 0.00 0.00 6 000.00 420.00 6 420.00 60.00 3 852.00 3 852.00 0.00 0.00 0.00
18. VWS 150 000.00 20 000.00 14 000.00 12 880.00 196 880.00 60.00 118 128.00 118 128.00 0.00 0.00 0.00
- Nictiz 20 000.00 0.00 3 000.00 1 610.00 24 610.00 60.00 14 766.00 14 766.00 0.00 0.00 0.00
Σ beneficiary 170 000.00 20 000.00 17 000.00 14 490.00 221 490.00 132 894.00 132 894.00 0.00 0.00 0.00
19. MoH-NO 8 000.00 0.00 6 000.00 980.00 14 980.00 60.00 8 988.00 8 988.00 0.00 0.00 0.00
- Hdir 32 000.00 0.00 0.00 2 240.00 34 240.00 60.00 20 544.00 20 544.00 0.00 0.00 0.00
- FHI 16 000.00 0.00 0.00 1 120.00 17 120.00 60.00 10 272.00 10 272.00 0.00 0.00 0.00
- E-helse 16 000.00 0.00 0.00 1 120.00 17 120.00 60.00 10 272.00 10 272.00 0.00 0.00 0.00
Σ beneficiary 72 000.00 0.00 6 000.00 5 460.00 83 460.00 50 076.00 50 076.00 0.00 0.00 0.00
20. SPMS 153 600.00 0.00 6 000.00 11 172.00 170 772.00 60.00 102 463.20 102 463.20 0.00 0.00 0.00
21. IPHS "Batut" 4 000.00 0.00 6 000.00 700.00 10 700.00 60.00 6 420.00 6 420.00 0.00 0.00 0.00
22. NIJZ 37 800.00 0.00 6 000.00 3 066.00 46 866.00 60.00 28 119.60 28 119.60 0.00 0.00 0.00
23. IACS 404 400.00 0.00 30 000.00 30 408.00 464 808.00 60.00 278 884.80 278 884.80 0.00 0.00 0.00
Page 3 of 4
Grant Agreement number: 101035467 — TEHDAS — HP-JA-2020 / HP-JA-2020-1
ESTIMATED BUDGET FOR THE ACTION Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Estimated eligible1 costs (per budget category) EU contribution Action's estimated receipts
Financial
B. Direct D. Indirect Reimbursement Maximum EU Maximum Income contributions
A. Direct C. Other Action’s
costs of Total costs generated given by third
personnel costs direct costs costs2 rate %3 contribution4 grant amount5 total receipts
subcontracting by the action parties to the
beneficiaries
A.1 Employees C.1 Travel
(or equivalent)
C.2 Equipment
A.2 Natural
persons under C.3 Other goods
direct contract and services
and seconded
persons
Cost form6 Actual Actual Actual Flat-rate7 7%
d=
a b c e = a+b+c+d f g=e*f h i j k=i+j
0.07 * (a+b+c)
24. SEHA 215 000.00 20 000.00 17 000.00 17 640.00 269 640.00 60.00 161 784.00 161 784.00 0.00 0.00 0.00
- PHAS 15 000.00 0.00 0.00 1 050.00 16 050.00 60.00 9 630.00 9 630.00 0.00 0.00 0.00
- NBHW 20 000.00 0.00 0.00 1 400.00 21 400.00 60.00 12 840.00 12 840.00 0.00 0.00 0.00
Σ beneficiary 250 000.00 20 000.00 17 000.00 20 090.00 307 090.00 184 254.00 184 254.00 0.00 0.00 0.00
25. NHSC 106 800.00 0.00 4 200.00 7 770.00 118 770.00 60.00 71 262.00 71 262.00 0.00 0.00 0.00
- WSI 21 000.00 0.00 1 500.00 1 575.00 24 075.00 60.00 14 445.00 14 445.00 0.00 0.00 0.00
Σ beneficiary 127 800.00 0.00 5 700.00 9 345.00 142 845.00 85 707.00 85 707.00 0.00 0.00 0.00
Σ consortium 3 377 745.00 183 000.00 333 336.00 272 585.67 4 166 666.67 60.007 2 500 000.00 2 500 000.00 0.00 0.00 0.00
1 See Article 6 for the eligibility conditions.
2 The indirect costs claimed must be free of any amounts covered by an operating grant (received under any EU or Euratom funding programme). A beneficiary that receives an operating grant during the action's duration
cannot claim any indirect costs for the year(s)/reporting period(s) covered by the operating grant (see Article 6.2.D).
3 See Article 5.2 for the reimbursement rate.
4 This is the theoretical amount of the EU contribution, if the reimbursement rate is applied to all the budgeted costs. This theoretical amount is capped by the 'maximum grant amount'.
5 The 'maximum grant amount' is the maximum grant amount decided by the Agency. It normally corresponds to the requested grant, but may be lower.
6 See Article 5 for the cost forms.
7 Flat rate : 7% of eligible direct costs.
Page 4 of 4
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
BUNDESMINISTERIUM FUER SOZIALES, GESUNDHEIT, PFLEGE UND
KONSUMENTENSCHUTZ (ATNA), established in Radetzkystrasse 2, WIEN 1030, Austria, (‘the
beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘2’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-999467243_75_210--]
Robert SCHARINGER with ECAS id nshariro signed in the Participant
Portal on 16/07/2021 at 12:43:41 (transaction id SigId-93583-xzKKN
jPPZu92aJOxogFFfAiyEvwFCHhAYcdk6lR4hud3Y8Eze7OLwrk2KQmd
ViIYGOkR2RslG1mR1AznFzQsXiq-yntOf97TTHqL2QVETsEsmO-kVAc
97m1gOA6iRYMA1jADuDv9zxrzO2wo2zu3m0To1hiCs1yh7BtzgZzM
VyzMzHOuOehqylBGFq7xKlFf6BrxZa0). Timestamp by third party at
2021.07.16 13:43:46 CEST
1
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SCIENSANO (Sciensano), established in JULIETTE WYTSMANSTRAAT 14, ELSENE 1050,
Belgium, VAT number: BE0693876830, (‘the beneficiary’), represented for the purpose of signing
this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘3’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-906160809_75_210--]
Herman Van Oyen with ECAS id n0026p8g signed in the Participant
Portal on 20/07/2021 at 11:19:29 (transaction id SigId-9533-gxjWxu
zvqAIRdMYqhNVvezk1dGPiIOGKfVjDP1wJr50qvKa5CauqNbbc7c9hS
9Skg2JCQfhiEzJxEEFn3zyi5s0-rS0vSrmBGYCpb7KrNobvPe-zzWDFHu
ZKefAi4YYX3wr40Zk1FhAEH39ULFAiL3v71tuK4AAmead0L4ziq0RMu
B4BpLVZS8eYWqUG28xk1lCT5W). Timestamp by third party at
2021.07.20 12:19:34 CEST
2
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
HRVATSKI ZAVOD ZA ZDRAVSTVENO OSIGURANJE (CHIF), established in
MARGARETSKA 3, ZAGREB 10000, Croatia, VAT number: HR3580261, (‘the beneficiary’),
represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘4’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-952813541_75_210--]
Lucian Vukelić with ECAS id n00292h5 signed in the Participant
Portal on 29/07/2021 at 08:18:05 (transaction id SigId-66217-Gdar
GkBW66zGFAzgApqyNNbAFzf8QdSEvUitzfi0WGSeLEiKpzfHX4NFYX
h76D8Tf9ygYskAbURQw3rBx9ZBXqH-yntOf97TTHqmetnCnXPXja-K
50lZvPD77fzwXzL8loLgvXzzdTLovSfvH2yyxzVunqd1bpzbIT9Qzs2ht
uTOfszhCAo3IULRtN739vMAjOKo5Rr). Timestamp by third party at
2021.07.29 09:18:10 CEST
3
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
Ministry of Health of the Republic of Cyprus (MoH-CY), established in 1 Prodromou Street &
17 Chilonos Street 1 & 17, Nicosia 1448, Cyprus, (‘the beneficiary’), represented for the purpose of
signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘5’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-994267946_75_210--]
Olga KALAKOUTA with ECAS id nkalakoo signed in the Participant
Portal on 19/07/2021 at 12:35:25 (transaction id SigId-6030-NKjJ4uR
e4hVv66UESvbmBJc8WSrzHezMsBV6A0w0o1wfSf1Gm0FzomxDKvLl
pmzKU8V88CP9Vx2bZF5TiJV1ZvG-jpJZscgsw0K70AXNlOzb60-q1NN
YFzM5zssMMqmegzzshzVDT35oObS7ezYwtQuy1hdwJLfjFejoP9ANJ
oSy4o1MtxcH89p8mX7Dcl7oqqXtKJ0). Timestamp by third party at
2021.07.19 13:35:32 CEST
4
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTERSTVO ZDRAVOTNICTVI CESKE REPUBLIKY (MZCR), established in
PALACKEHO NAMESTI 375/4, PRAHA 12801, Czech Republic, (‘the beneficiary’), represented
for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘6’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-924144512_75_210--]
Martin ZEMAN with ECAS id nzemmrti signed in the Participant
Portal on 25/08/2021 at 07:47:54 (transaction id SigId-76420-WLZwI
TU5ClaZsjzwMHEbrhgag68uuMsyznOh1qyIznPbRhJeDS7LMcnb4ze
AYrDMFG6870Zp4rmXT1f0FcBdl9e-rS0vSrmBGYC4qPWkzdfTt3-AipV
XsE2Ug6zQgxTUPG3sH9Ulhm2NEc6KiWOPWuqNU1bBQaVwy5twHj
46RpJInzYA0g0XqumCJTB4J0AzKvp9JG). Timestamp by third party at
2021.08.25 08:48:04 CEST
5
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
REGION MIDTJYLLAND (RM), established in Skottenborg 26, VIBORG 8800, Denmark, VAT
number: DK29190925, (‘the beneficiary’), represented for the purpose of signing this Accession Form
by the undersigned,
hereby agrees
to become beneficiary No (‘7’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-997381452_75_210--]
Jane Baad Jensen with ECAS id n0064tf2 signed in the Participant
Portal on 09/08/2021 at 06:56:30 (transaction id SigId-6656-LRijT7y
5OHxzTWJ9LczyYjUvBUIM2gvOVB0WL845dxSzX5qYIvglQTCRrYOQI
Y59zOEX9Xdzu64NA86dzNZZstr0-yntOf97TTHqdDioHdsXzeo-1Ozc
dTi17dzTESBdy4ziWKarr20RBzKBOguPfGBYVhbaFktCq0cTllGRSoP
D2LcGkDOHI0aW6RmdSzu8jtsMvl6). Timestamp by third party at
2021.08.09 07:56:37 CEST
6
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SOTSIAALMINISTEERIUM (MoSA), established in Suur-Ameerika 1, TALLINN 10122, Estonia,
(‘the beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘8’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-998429731_75_210--]
Marika PRISKE with ECAS id nprmaika signed in the Participant
Portal on 10/08/2021 at 08:49:11 (transaction id SigId-4931-Odtpx6
4lRPfleBtTg4NMUPv7w9tl3pRTZzGoJlnmfd371lm3zQTd7mFMDcMz
Ilk0YwSFGV3IlKLrSTGV51fUBO0-jpJZscgsw0KI5zvPP5v2mq-k5pIT7i
GtR2624rklGmzzUzdzcqhBn0ycNHtERwhkQ6pNKtcUVerWuYtxNqT
s9c36IeMvBkmaS5zRGx6jPZxxNm). Timestamp by third party at
2021.08.10 09:49:16 CEST
7
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
PLATEFORME DES DONNEES DE SANTE (FR-HDH), established in 9 RUE GEORGES
PITARD, Paris 75015, France, VAT number: FR66130003783, (‘the beneficiary’), represented for the
purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘9’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-895824586_75_210--]
Stephanie Combes with ECAS id n003cp4i signed in the Participant
Portal on 25/07/2021 at 19:01:53 (transaction id SigId-28502-MkxA
WLKPYpdQGXRpdlMaTo5uj3lg5ZAwVP1CFu4KJ85n056EOzMNm17
6IMpYVrltgegYbqKhgjpaB0XWyjrvLK-yntOf97TTHqmetnCnXPXja-lK
xqFb0GLJx3X0IvrjgHJBzJzOZRXZzaR2GkmhF4aSwID7WT3of5VpjBw
pRE6tL1fpp6KebRzqjbhR8TMpzP2N4). Timestamp by third party at
2021.07.25 20:02:02 CEST
8
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
BUNDESMINISTERIUM FUER GESUNDHEIT (BMG), established in ROCHUSTRASSE 1,
BONN 53123, Germany, (‘the beneficiary’), represented for the purpose of signing this Accession
Form by the undersigned,
hereby agrees
to become beneficiary No (‘10’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-998954889_75_210--]
Judith haugwitz with ECAS id n002x29v signed in the Participant
Portal on 23/07/2021 at 08:49:44 (transaction id SigId-19595-T12YR
EXx8UxJ6yafL4bnMpaTWw6zWeoPjEiB79XS68ObkidcxtfLv269Dwjgd
Hwat1HzaEGGZQuMHI8ZgkmM19-yntOf97TTHqmetnCnXPXja-qSMz
mQFr1zmgIFVUkFbBJDXj1R8veBTaN3SvOupYXegnfqSrBZOaYJxuSP5
HO9FWL7rUdTchZLzcIYhbCVO7TlG). Timestamp by third party at
2021.07.23 09:49:49 CEST
9
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
DIOIKISI 6IS YGEIONOMIKIS PERIFEREIAS PELOPONNISOU IONION NYSON
IPEIROU KAI DYTIKIS ELLADAS (6th Y. PE.), established in IPATIS 1, PATRAS 26 441,
Greece, VAT number: EL999100797, (‘the beneficiary’), represented for the purpose of signing this
Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘11’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-915909600_75_210--]
Ioannis Karvelis with ECAS id n003c0n7 signed in the Participant
Portal on 16/07/2021 at 12:58:46 (transaction id SigId-93839-HJHzIT
gS5TQzUHaK8lx2GWwTVMXDCHHmKzOhidkmR0IVyzYIeM4iY59UC
SHsi8BNFPgVkUh72ilcnYfbteGfNZ0-yntOf97TTHqL2QVETsEsmO-M1
q6yVh7UxgxeYYYjgtj0HtmXhDfb3ph8o7fBxv3uf1FsfPsdrQazfAsR8el
1zcw0CzzyQ5OMnFwWfZFWzSXzVn0). Timestamp by third party at
2021.07.16 13:58:51 CEST
10
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
ORSZAGOS KORHAZI FOIGAZGATOSAG (OKFŐ), established in DIOS AROK 3,
BUDAPEST 1125, Hungary, VAT number: HU15845883, (‘the beneficiary’), represented for the
purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘12’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-891516331_75_210--]
Zoltán Jenei with ECAS id n005mzc2 signed in the Participant Portal
on 12/08/2021 at 17:23:05 (transaction id SigId-4663-bWZjb6DCzxo
baoOAKjuW0xL4mj5EZR6CXLRPszT0A20N241MJjMSjGBizgrbQZ7zL
LBfLxVE9zWGI3TQWGSBWaN-rS0vSrmBGYC4qPWkzdfTt3-NDGKG1
lBIUqaX5ctw7CwpztQ1m2tXeX3TApE4xxwzLCXWYpGqAZcjNXEHNS
rZDlGL8lWU3aWQLoWhE8Xt88oo4). Timestamp by third party at
2021.08.12 18:23:12 CEST
11
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
DEPARTMENT OF HEALTH (DoH-IE), established in Block 1, Miesian Plaza, 50 – 58 Lower
Baggot Street, Dublin D02 XW14, Ireland, (‘the beneficiary’), represented for the purpose of signing
this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘13’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-972459824_75_210--]
Alan CAHILL with ECAS id ncahilal signed in the Participant Portal
on 03/08/2021 at 10:31:44 (transaction id SigId-16938-d1FmC9bC
DFxdwVcQcpuAkWREdnl8vSbRaYtfAXhJM2ziV9QQjRRbNrzszT0ajb
GoXqem7lyCrFDs7Wuze1E8vMy-rS0vSrmBGYCf5hdFt0R2zu-mwqB
oIyqEExG0KOsjxSQ0xSRw4LxUTzdndKdAH3ihiFhmBPWfNFgNOqR
AFgCIPlowFbbPsA1is6nCxJxjnmXMO). Timestamp by third party at
2021.08.03 11:31:48 CEST
12
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTERO DELLA SALUTE (MINSAL), established in Via Giorgio Ribotta 5, ROMA 00144,
Italy, VAT number: N/A, (‘the beneficiary’), represented for the purpose of signing this Accession
Form by the undersigned,
hereby agrees
to become beneficiary No (‘14’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-999531942_75_210--]
Giuseppe Viggiano with ECAS id n001zb0n signed in the Participant
Portal on 20/07/2021 at 14:08:52 (transaction id SigId-1080-DscdTz
YRd2IozZm3zKWpGsrO3OZ8c9u7rmYPx3RlNIzjetbvSzoSXuzQmQK4
pSw2J3VUqJ81vK7tdzpCJgn25j7m-yntOf97TTHqmetnCnXPXja-fmvsI
Vf8p7jO13Yu1PyocNhn4pLFn28O7MDHrrK1krTMdAnQFHjcSA7wS
WkQp2VjpzLJXME7l5nd1zwhWRe3US). Timestamp by third party at
2021.07.20 15:08:56 CEST
13
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
LIETUVOS RESPUBLIKOS SVEIKATOS APSAUGOS MINISTERIJA (SAM-LT),
established in VILNIAUS G 33, VILNIUS LT 01506, Lithuania, (‘the beneficiary’), represented for
the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘15’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-933839468_75_210--]
Neringa Viliunaite with ECAS id n002eu0d signed in the Participant
Portal on 20/07/2021 at 07:49:01 (transaction id SigId-6473-y73Ma
Jn7kZOsSCnjztJiidEv5Ys8gQyCbNkdoe8zjjIiBahS2kXzewN3gA8rS7K
VlJiVPgpy08uBB2IRcZQJKVW-rS0vSrmBGYCpb7KrNobvPe-NDXt1LK
zQDYBnvcAKzvqqd9FjLZYMkP3U5lS7t5HoZvzqngXg3mFzx3OczcpG
YOYThuDhrnmmi2EtdH1mG543RO). Timestamp by third party at
2021.07.20 08:49:06 CEST
14
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
Ministry for Health - Government of Malta (DHIR), established in Palazzo Castellania, Merchants
Street 15, Valletta VLT 200, Malta, VAT number: MT12979127, (‘the beneficiary’), represented for
the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘16’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-974144423_75_210--]
Joseph RAPA with ECAS id nraparjo signed in the Participant Portal
on 12/08/2021 at 08:13:40 (transaction id SigId-4590-9XAm5mrHA
QgQrAeDTzWj18yC8UseCzqi3XA5szocqYTPk6Y95u1ozRVMrnKUhp
dSKispzPfuXeyhZSovMN2FEwq-jpJZscgsw0Kn625v6UOd1S-3yFNJ6s
WqutcMLocmHLUET0oQPsKBVKp7gzQn1UZ2NCjZ9UioXCzamQFO
3qYqy5QKanfYBCoINIxghzgTP5TSDG). Timestamp by third party at
2021.08.12 09:13:46 CEST
15
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
AGENTIA DE TRANSPLANT (ATRM), established in STRADA TESTEMITEANU 29,
CHISINAU 2025, Moldova, (‘the beneficiary’), represented for the purpose of signing this Accession
Form by the undersigned,
hereby agrees
to become beneficiary No (‘17’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-973591911_75_210--]
Vladimir Bolocan with ECAS id n006aojs signed in the Participant
Portal on 18/07/2021 at 09:13:01 (transaction id SigId-99056-TqXJCM
V9JPMAzhzeMr9ObzjUYNF3H4iO5V3zuu3cIgRKeqXVj1O4GlzjaJzbc2u
nNh3lZWq8Z3XrcWwKOsH2zrJa-yntOf97TTHqL2QVETsEsmO-obPXN
Bx4RXdzj7M1DyGLiS07eDrPn4wDFQckP7eQKZmcV2IZrK55PZXfhdTs
HF0DbsR5gB3bN2AMhzzkA0fWQn0). Timestamp by third party at
2021.07.18 10:13:08 CEST
16
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTERIE VAN VOLKSGEZONDHEID, WELZIJN EN SPORT (VWS), established in
PARNASSUSPLEIN 5, DEN HAAG 2500 EJ, Netherlands, (‘the beneficiary’), represented for the
purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘18’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-998886601_75_210--]
Ron ROOZENDAAL with ECAS id nroozenr signed in the Participant
Portal on 11/08/2021 at 10:46:04 (transaction id SigId-17223-qmdT
Y6iEIj7jp9vHRHFjuG0h8FOyaTvApt15tcekT1dT5GFPvUpkG1vW0ddi
ws545MYBzN45oa8EiyVDH8zdAn-jpJZscgsw0KI5zvPP5v2mq-jdwoT
EtruSaLVBHagXxeADERDBblzJ24sxpzc7azgcRFqZOtRcspsI6SaSyj3o
hzIaaBJLzfXOtYC1Ijy6G3CUD). Timestamp by third party at
2021.08.11 11:46:12 CEST
17
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
THE NORWEGIAN MINISTRY OF HEALTH AND CARE SERVICES (MoH-NO), established
in R6 Teatergata 9, 0030 Oslo 8011, Norway, (‘the beneficiary’), represented for the purpose of signing
this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘19’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-892752693_75_210--]
Ole T. Andersen with ECAS id n005tk7e signed in the Participant
Portal on 04/08/2021 at 08:54:09 (transaction id SigId-26917-TRjVtW
W4mNzzHIZ68XVAGsJA3ozxNyQh5fIX41GLtdqi0JjIkzYxY5jnxUHJbLn
6A07ztQ3Dis64rua5irYM83zW-rS0vSrmBGYCf5hdFt0R2zu-qzgaiFyO
PxSjoIHZKvWHZB8mMCJzpzXnPRYDjuYWLGLObQLWujf81F410w5M
MNongzgC4ssG7IRKGN4PYmDNlQu). Timestamp by third party at
2021.08.04 09:54:14 CEST
18
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SPMS - SERVICOS PARTILHADOS DO MINISTERIO DA SAUDE EPE (SPMS), established
in AVENIDA DA REPUBLICA, 61, LISBOA 1050 189, Portugal, VAT number: PT509540716, (‘the
beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘20’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-950932323_75_210--]
Luis Goes Pinheiro with ECAS id n006a5hr signed in the Participant
Portal on 12/08/2021 at 14:40:54 (transaction id SigId-2727-LcwihY
C2tJOSVEbyavXHXAbQzOSuVQ5D0vxEZ1uJsXH6zZc6NLEMyRvSsOQ
LRl3dzHcT83GxIa8TmzHUFk2OFzd-rS0vSrmBGYC4qPWkzdfTt3-VYG
U6WE8Zv9iqUFujRf3YYr98CRj1Z1GaoIKoL02Fgw8e6BxFcIBO22TJVa
7LWrDjib82Kr3sXbzgoBwSXUEVm). Timestamp by third party at
2021.08.12 15:41:00 CEST
19
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
INSTITUT ZA ZASTITU ZDRAVLJA SRBIJEDR MILAN JOVANOVIC BATUT (IPHS
"Batut"), established in DR SUBOTICA STREET 5, BEOGRAD 11000, Serbia, VAT number:
RS102000930, (‘the beneficiary’), represented for the purpose of signing this Accession Form by the
undersigned,
hereby agrees
to become beneficiary No (‘21’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-941063349_75_210--]
Verica JOVANOVIC with ECAS id njovveri signed in the Participant
Portal on 16/07/2021 at 07:12:12 (transaction id SigId-88315-K5TMkx
XvChxvRtdzzzLL6IGHEjWnfYHEcScQ2rYd09GxmZYlPntOJtSqOw6EGk0
PkQzpwknPAHrwezOWT8ezsu9W-yntOf97TTHqL2QVETsEsmO-znPfzL
HK9IgbB3ST5fKD55DhWSzjr8yKHXniHHAWML8iSsbx2WXD7LU5ozww
rTgUBvG0ny2p1CE9xUCkRAv05sy). Timestamp by third party at
2021.07.16 08:12:17 CEST
20
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
NACIONALNI INSTITUT ZA JAVNO ZDRAVJE (NIJZ), established in TRUBARJEVA CESTA
2, LJUBLJANA 1000, Slovenia, VAT number: SI44724535, (‘the beneficiary’), represented for the
purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘22’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-948891346_75_210--]
Milan Krek with ECAS id n003bif0 signed in the Participant Portal
on 26/07/2021 at 11:28:30 (transaction id SigId-34919-0p1nJNoep
WKzXFDSwczzrX1vxiUYR61puwFM7nn4LqPTDjBi0wMxVJRBATRW
oXutd0FBcFsyYtyjQv9wAYczzsT-yntOf97TTHqmetnCnXPXja-JCBos
4qYZzP57fVVaJNvwzyA9aoJxPXEy85vznfa7YzLn1WFKMYJhRyZCq5
kaxYXGETfBBzUoCg8sPvFku92MSb). Timestamp by third party at
2021.07.26 12:28:35 CEST
21
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
INSTITUTO ARAGONES DE CIENCIAS DE LA SALUD (IACS), established in AVENIDA
SAN JUAN BOSCO 13, ZARAGOZA 50009, Spain, VAT number: ESQ5000654C, (‘the
beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘23’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-998462032_75_210--]
sandra GARCIA-ARMESTO with ECAS id ngarcisx signed in the
Participant Portal on 16/07/2021 at 12:08:36 (transaction id SigId-
93091-zWLzcNtszkAvDd6RznA5YeW2srD3cbGV3NruNFXcC60f8hRTP8
WRW9nh9425pcZbdg2pzzGF4ZnkzNCGEzJEodKo-
yntOf97TTHqL2QVETsEsmO-kp3cLq3zfoefRYOQ1nzNxzmtZUbUkrwzfe
MK7ryLNfrCYuQruvy8tAKD76Z1k5STn35cPxrLl4kDwD36TzGqk3q).
Timestamp by third party at
2021.07.16 13:08:44 CEST
22
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
E-HALSOMYNDIGHETEN (SEHA), established in SANK ERIKSGATAN 117, STOCKHOLM
118 60, Sweden, VAT number: SE202100655201, (‘the beneficiary’), represented for the purpose of
signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘24’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-933263676_75_210--]
Michele Silvestri with ECAS id n002v8z3 signed in the Participant
Portal on 02/08/2021 at 10:57:16 (transaction id SigId-6075-IosvIX
UNe4cZRaenbr0SnpvS6LjnptHvrzpSNlJFvbXDVyfkAKviP7ru396GbV
aPpPhALCWVGQ8TjQzi9qIPzcm-rS0vSrmBGYCf5hdFt0R2zu-mBRm
BpbbZ2pDh0vfP6q5Lzr3abVF9TJJByBs5NrXtEXMutJgzmedqg8TIop
dtDihenjak2KNiHYhd9pUdpKdXc). Timestamp by third party at
2021.08.02 11:57:22 CEST
23
Grant Agreement number: 101035467 — TEHDAS
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
THE NHS CONFEDERATION (NHSC), established in 2ND FLOOR 18 SMITH SQUARE,
LONDON SW1P 3HZ, United Kingdom, VAT number: GB788186860, (‘the beneficiary’),
represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘25’)
in Grant Agreement No 101035467 (‘the Grant Agreement’)
between SUOMEN ITSENAISYYDEN JUHLARAHASTO and the European Health and Digital
Executive Agency (‘the EU’), represented by the European Commission ('the Commission'),
for the action entitled Towards the European Health DAta Space Joint Action (TEHDAS).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-892794888_75_210--]
Rosie Richards with ECAS id n0045gsf signed in the Participant
Portal on 27/07/2021 at 10:42:41 (transaction id SigId-44495-i0iHhn
3LJmzcSrwVjido2DCOt6M2refjWXg1TRZQgRTWUbFe3WMLOgLFbxO
aYxt9Wvgojp6HR6nF7RodkQYthO-yntOf97TTHqmetnCnXPXja-R15h
b4tIkkZvuNOSea7i2Yd4mQzbxe7OUjAxRMnO0E2ABniVtGj8wac8UTt
bzGvaH6r07d4X7oNXXpABLUjMjh). Timestamp by third party at
2021.07.27 11:42:49 CEST
24
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
i print format A4
MODEL ANNEX 4 CHAFEA MGA — MULTI
landscape
FINANCIAL STATEMENT FOR [BENEFICIARY [name]/AFFILIATED ENTITY [name]] FOR REPORTING PERIOD [reporting period]
1 Receipts EU contribution
Eligible costs (per budget category)
Financial
contributions Reimburseme Maximum EU
A. Direct personnel B. Direct costs of C. Other direct 2 Income generated Requested EU
D. Indirect costs Total costs given by third Total receipts 3 4
costs subcontracting costs by the action nt rate % constribution contribution
parties to the
beneficiaries
A.1 Employees (or
C.1 Travel
equivalent)
A.2 Natural persons
C.2 Equipment
under direct contract
and seconded persons
C.3 Other goods and
services
6
5 Actual Actual Actual Flat-rate
Cost form
7%
d= e=
a b c f g h= f + g i j k
0,07 * (a + b + c) a+ b + c + d
[short name beneficiary
/ affiliated entity]
The beneficiary/affiliated entity hereby confirms that:
The information provided is complete, reliable and true.
The costs declared are eligible (see Article 6).
The costs can be substantiated by adequate records and supporting documentation that will be produced upon request or in the context of checks, reviews, audits and investigations (see Articles 12, 13 and 17).
For the last reporting period: that all the receipts have been declared (see Article 5.3.3).
i Please declare all eligible costs, even if they exceed the amounts indicated in the estimated budget (see Annex 2). Only amounts that were declared in your individual financial
statements can be taken into account lateron, in order to replace other costs that are found to be ineligible.
1
See Article 6 for the eligibility conditions.
2
The indirect costs claimed must be free of any amounts covered by an operating grant (received under any EU or Euratom funding programme). A beneficiary that receives an operating grant during the duration of the action cannot
claim any indirect costs for the year(s) covered by the operating grant (see Article 6.2.D).
3
See Article 5.2 for the reimbursement rate
4
This is the theoretical amount of EU contribution that the system calculates automatically (by multiplying the reimbursement rate by the total costs declared). The amount you request (in the column 'requested EU contribution') may
have to be less.
5
See Article 5 for the cost forms.
6
Flat rate : 7% of eligible direct costs.
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
ANNEX 5
MODEL FOR THE CERTIFICATE ON THE FINANCIAL STATEMENT (CFS)
This document sets out:
- the objectives and scope of the independent report of factual findings on costs declared
under a EU grant agreement financed under the Health Programme (2014-2020) or
Consumer Programme (2014-2020) and
- a model for the certificate on the financial statement (CFS).
1. Background and subject matter
[OPTION 1 for actions with one RP and NO interim payments: Within 60 days of the end of
the reporting period, the coordinator must submit to the Commission a final report, which
should include (among other documents and unless otherwise specified in Article 15 of the
Grant Agreement) a certified financial statement (CFS; see proposed model below) for each
beneficiary and (if applicable) each affiliated entity, if:
- it requests an EU contribution of EUR 150 000 or more as reimbursement of actual
costs and
- the maximum EU contribution indicated for that beneficiary/affiliated entity in the
estimated budget (see Annex 2) as reimbursement of actual costs is EUR 200 000 or
more.]
[OPTION 2 for actions with several RPs and interim payments: Within 60 days of the end
of each reporting period, the coordinator must submit to the Commission a periodic report,
which should include (among other documents and unless otherwise specified in Article 15 of
the Grant Agreement) a certified financial statement (CFS; see proposed model below) for
each beneficiary and (if applicable) each affiliated entity, if:
- the cumulative amount of EU contribution the beneficiary/affiliated entity requests as
reimbursement of actual costs is EUR 150 000 or more and
- the maximum EU contribution indicated for that beneficiary/affiliated entity in the
estimated budget (see Annex 2) as reimbursement of actual costs is EUR 200 000 or
more.
The CFS must be submitted every time the cumulative amount of payments requested (i.e.
including in previous financial statements) reaches the threshold (i.e. a first certificate once
the cumulative amount reaches 150 000, a second certificate once it reaches 300 000, a third
certificate once it reaches 450 000, etc.).
Once the threshold is reached, the CFS must cover all reporting periods for which no
certificate has yet been submitted.]
1
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
The beneficiary must provide the CFS for itself and, if applicable, for its affiliated entity(ies).
The purpose of the audit on which the CFS is based is to give the Agency ‘reasonable
assurance’1 that costs declared as eligible costs under the grant (and, if relevant, receipts
generated in the course of the action) are being claimed by the beneficiary in accordance with
the relevant legal and financial provisions of the Grant Agreement.
The scope of the audit is limited to the verification of eligible costs included in the CFS. The
audit must be conducted in line with point 3 below.
Certifying auditors must carry out the audits in compliance with generally accepted audit
standards and indicate which standards they have applied. They must bear in mind that, to
establish a CFS, they must carry out a compliance audit and not a normal statutory audit. The
eligibility criteria in the Grant Agreement always override normal accounting practices.
The beneficiary and the auditor are expected to address any questions on factual data or
detailed calculations before the financial statement and the accompanying certificate are
submitted. It is also recommended that the beneficiary take into account the auditor’s
preliminary comments and suggestions in order to avoid a qualified opinion or reduce the
scope of the qualifications.
Since the certificate is the main source of assurance for cost claims and payments, it will be
easier to consider amounts as eligible if a non-qualified certificate is provided.
The submission of a certificate does not affect the Agency’s right to carry out its own
assessment or audits. Neither does the reimbursement of costs covered by a certificate
preclude the Agency or the Commission, the European Anti-Fraud Office or the European
Court of Auditors from carrying out checks, reviews, audits and investigations in accordance
with Article 17 of the Grant Agreement.
The Agency expects the certificates to be issued by auditors according to the highest
professional standards.
2. Auditors who may deliver a certificate
The beneficiary is free to choose a qualified external auditor, including its usual external
auditor, provided that:
- the external auditor is independent from the beneficiary and
- the provisions of Directive 2006/43/EC2 are complied with.
1
This means a high degree of confidence.
2
Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of
annual accounts and consolidated accounts or similar national regulations (OJ L 157, 9.6.2006, p. 87).
2
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Independence is one of the qualities that permit the auditor to apply unbiased judgement and
objective consideration to established facts to arrive at an opinion or a decision. It also means
that the auditor works without direction or interference of any kind from the beneficiary.
Auditors are considered as providing services to the beneficiary/affiliated entity under a
purchase contract within the meaning of Article 9 of the Grant Agreement. This means that
the costs of the CFS may normally be declared as costs incurred for the action, if the cost
eligibility rules set out in Articles 6 and 9.1.1 of the Grant Agreement are fulfilled (especially:
best value for money and no conflict of interests; see also below eligibility of costs of other
goods and services). Where the beneficiary/affiliated entity uses its usual external auditor, it is
presumed that they already have an agreement that complies with these provisions and there is
no obligation to find new bids. Where the beneficiary/affiliated entity uses an external auditor
who is not their usual external auditor, it must select an auditor following the rules set out in
Article 9.1.1.
Public bodies can choose an external auditor or a competent public officer. In the latter case,
the auditor’s independence is usually defined as independence from the audited beneficiary
‘in fact and in appearance’. A preliminary condition is that this officer was not involved in
any way in drawing up the financial statements. Relevant national authorities establish the
legal capacity of the officer to carry out audits of that specific public body. The certificate
should refer to this appointment.
3. Audit methodology and expected results
3.1 Verification of eligibility of the costs declared
The auditor must conduct its verification on the basis of inquiry and analysis,
(re)computation, comparison, other accuracy checks, observation, inspection of records and
documents and by interviewing the beneficiary (and the persons working for it).
The auditor must examine the following documentation:
the Grant Agreement and any amendments to it;
the periodical and/or final report(s);
for personnel costs
o salary slips;
o time sheets;
o contracts of employment;
o other documents (e.g. personnel accounts, social security legislation, invoices,
receipts, etc.);
o proofs of payment;
for subcontracting
o the call for tender;
o tenders (if applicable);
o justification for the choice of subcontractor;
o contracts with subcontractors;
o invoices;
o declarations by the beneficiary;
o proofs of payment;
3
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
o other documents: e.g. national rules on public tendering if applicable, EU
Directives, etc.;
for travel and subsistence costs
o the beneficiary’s internal rules on travel;
o transport invoices and tickets (if applicable);
o declarations by the beneficiary;
o other documents (proofs of attendance such as minutes of meetings, reports,
etc.);
o proofs of payment;
for equipment costs
o invoices;
o delivery slips / certificates of first use;
o proofs of payment;
o depreciation method of calculation;
for costs of other goods and services
o invoices;
o proofs of payment; and
o other relevant accounting documents.
General eligibility rules
The auditor must verify that the costs declared comply with the general eligibility rules set out
in Article 6.1 of the Grant Agreement.
In particular, the costs must:
be actually incurred;
be linked to the subject of the Grant Agreement and indicated in the beneficiary's
estimated budget (i.e. the latest version of Annex 2);
be necessary to implement the action which is the subject of the grant;
be reasonable and justified, and comply with the requirements of sound financial
management, in particular as regards economy and efficiency;3
have been incurred during the action, as defined in Article 3 of the Grant Agreement
(with the exception of the invoice for the audit certificate and costs relating to the
submission of the final report);
not be covered by another EU or Euratom grant (see below ineligible costs);
be identifiable, verifiable and, in particular, recorded in the beneficiary's accounting
records and determined according to the applicable accounting standards of the
country where it is established and its usual cost-accounting practices;
comply with the requirements of applicable national laws on taxes, labour and social
security;
be in accordance with the provisions of the Grant Agreement (see, in particular,
Articles 6 and 9-11a) and
have been converted to euro at the rate laid down in Article 15.6 of the Grant
Agreement:
3
To be assessed in particular on the basis of the procurement and selection procedures for service providers.
4
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
o for beneficiaries with accounts established in a currency other than the euro:
Costs incurred in another currency must be converted into euros at the average
of the daily exchange rates published in the C series of the EU Official Journal
determined over the corresponding reporting period.
If no daily euro exchange rate is published in the EU Official Journal for the
currency in question, the rate used must be the average of the monthly
accounting rate established by the Commission and published on its website;
o for beneficiaries with accounts established in euro:
Costs incurred in another currency should be converted into euros applying the
beneficiary’s usual accounting practice.
The auditor must verify whether expenditure includes VAT and, if so, verify that the
beneficiary:
- cannot recover the VAT (this must be supported by a statement from the competent
body) and
- is not a public body acting as a public authority.
The auditor should base his/her audit approach on the confidence level following a review of
the beneficiary's internal control system. When using sampling, the auditor should indicate
and justify the sampling size.
Specific eligibility rules
In addition, the auditor must verify that the costs declared comply with the specific cost
eligibility rules set out in Article 6.2 and Articles 9.1.1, 10.1.1, 11.1.1, 11a.1.1 and 11a.2.1 of
the Grant Agreement.
Personnel costs
The auditor must verify that:
personnel costs have been charged and paid in respect of the actual time devoted by
the beneficiary’s personnel to implementing the action (justified on the basis of time
sheets or other relevant time-recording system);
personnel costs were calculated on the basis of annual gross salary, wages or fees (plus
obligatory social charges, but excluding any other costs) specified in an employment
or other type of contract, not exceeding the average rates corresponding to the
beneficiary’s usual policy on remuneration;
the work was carried out during the period of implementation of the action, as defined
in Article 3 the Grant Agreement and
the personnel costs are not covered by another EU or Euratom grant (see below
ineligible costs);
for additional remunerations: the 2 conditions set out in Article 6.2.A.1 are met (i.e.
that it is part of the beneficiary’s usual remuneration practices and is paid in a
consistent manner whenever the same kind of work or expertise is required and that
the criteria used to calculate the supplementary payments are objective and generally
applied by the beneficiary, regardless of the source of funding used);
for in-house consultants: the 3 conditions set out in Article 6.2.A.2 of the Grant
Agreement are met (i.e. that the in-house consultant works under the beneficiary’s
5
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
instructions, that the result of the work carried out belongs to the beneficiary, and that
the costs are not significantly different from those for personnel performing similar
tasks under an employment contract).
The auditor should have assurance that the management and accounting system ensures
proper allocation of the personnel costs to various activities carried out by the beneficiary and
funded by various donors.
Subcontracting costs
The auditor must verify that:
the subcontracting complies with best value for money (or lowest price) and that there
was no conflict of interests;
the subcontracting was necessary to implement the action for which the grant is
requested;
the subcontracting was provided for in Annex 1 and Annex 2 or agreed to by the
Agency at a later stage;
the subcontracting is supported by accounting documents in accordance with national
accounting law
public bodies have complied with the national rules on public procurement.
Travel and subsistence costs
The auditor must verify that travel and subsistence costs:
have been charged and paid in accordance with the beneficiary's internal rules or usual
practices;
are not covered by another EU or Euratom grant (see below ineligible costs);
were incurred for travels linked to action tasks set out in Annex 1 of the Grant
Agreement.
Equipment costs
The auditor must verify that:
the equipment is purchased, rented or leased at normal market prices;
public bodies have complied with the national rules on public procurement;
the equipment is written off, depreciation has been calculated according to the tax and
accounting rules applicable to the beneficiary and only the portion of the depreciation
corresponding to the duration of the action has been declared and
the costs are not covered by another EU or Euratom grant (see below ineligible costs).
Costs of other goods and services
The auditor must verify that:
the purchase complies with best value for money (or lowest price) and that there was
no conflict of interests;
public bodies have complied with the national rules on public procurement;
the costs are not covered by another EU or Euratom grant (see below ineligible costs).
6
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Ineligible costs
The auditor must verify that the beneficiary has not declared any costs that are ineligible
under Article 6.4 of the Grant Agreement:
costs relating to return on capital;
debt and debt service charges;
provisions for future losses or debts;
interest owed;
doubtful debts;
currency exchange losses;
bank costs charged by the beneficiary’s bank for transfers from the Agency;
excessive or reckless expenditure;
deductible VAT;
VAT incurred by a public body acting as a public authority;
costs incurred during suspension of the implementation of the action;
in-kind contributions from third parties;
costs declared under other EU or Euratom grants (including those awarded by a
Member State and financed by the EU or Euratom budget or awarded by bodies other
than the Agency for the purpose of implementing the EU or Euratom budget); in
particular, indirect costs if the beneficiary is already receiving an operating grant
financed by the EU or Euratom budget in the same period;
costs incurred for permanent staff of a national administration for activities that are
part of its normal activities (i.e. not undertaken only because of the grant);
costs incurred for staff or representatives of EU institutions, bodies or agencies.
3.2 Verification of receipts
The auditor must verify that the beneficiary has declared receipts within the meaning of
Article 5.3.3 of the Grant Agreement, i.e.:
income generated by the action (e.g. from the sale of products, services and
publications, conference fees) and
financial contributions given by third parties, specifically to be used for costs that are
eligible under the action.
3.3 Verification of the beneficiary’s accounting system
The auditor must verify that:
the accounting system (analytical or other suitable internal system) makes it possible
to identify sources of financing for the action and related expenses incurred during
the contractual period and
expenses/income under the grant have been recorded systematically using a
numbering system that distinguishes them from expenses/income for other projects.
7
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
Certificate on the financial statement (CFS)
To
[Beneficiary/affiliated entity’s full name
address]
We, [full name of the audit firm/organisation], established in [full address/city/country],
represented for signature of this audit certificate by [name and function of an authorised
representative],
hereby certify
that:
1. We have conducted an audit relating to the costs declared in the financial statement of
[name of beneficiary/affiliated entity] (the [‘beneficiary’][‘affiliated entity’]), to which
this audit certificate is attached and which is to be presented to the Consumers, Health,
Agriculture and Food Executive Agency under Grant Agreement No [insert number] —
[insert acronym], covering costs for the following reporting period(s): [insert reporting
period(s)].
2. We confirm that our audit was carried out in accordance with generally accepted
auditing standards in compliance with ethical rules and on the basis of the provisions of
the Grant Agreement and its Annexes (and in particular the audit methodology
described in Annex 5).
3. The financial statement was examined and all necessary tests of [all][[X]%] of the
supporting documentation and accounting records were carried out in order to obtain
reasonable assurance that, in our opinion and on the basis of our audit
total costs of EUR [insert number] ([insert amount in words]) are eligible, i.e.:
actual;
determined in accordance with the [beneficiary’s][affiliated entity’s]
accounting principles;
incurred during the period referred to in Article 3 of the Grant Agreement;
recorded in the [beneficiary’s][affiliated entity’s] accounts (at the date of this
audit certificate);
comply with the specific eligibility rules in Article 6.2 of the Grant Agreement;
do not contain costs that are ineligible under Article 6.4 of the Grant
Agreement, in particular:
costs relating to return on capital;
debt and debt service charges;
provisions for future losses or debts;
interest owed;
doubtful debts;
currency exchange losses;
8
Associated with document Ref. Ares(2021)4548885 - 13/07/2021
bank costs charged by the [beneficiary’s][affiliated entity’s] bank for
transfers from the Agency;
excessive or reckless expenditure;
deductible VAT;
VAT incurred by a public body acting as a public authority;
costs incurred during suspension of the implementation of the action;
in-kind contributions provided by third parties;
costs declared under other EU or Euratom grants (including those
awarded by a Member State and financed by the EU or Euratom budget
or awarded by bodies other than the Agency for the purpose of
implementing the EU or Euratom budget); in particular, indirect costs if
the [beneficiary][affiliated entity] is already receiving an operating
grant financed by the EU or Euratom budget in the same period;
costs incurred for permanent staff of a national administration, for
activities that are part of its normal activities (i.e. not undertaken only
because of the grant);
costs incurred for staff or representatives of EU institutions, bodies or
agencies;
[are claimed according to the euro conversion rate referred to in Article 15.6 of
the Grant Agreement;]
total receipts of EUR [insert number] ([insert amount in words]) have been declared
under Article 5.3.3 of the Grant Agreement and
the [beneficiary’s][affiliated entity’s] accounting procedures are in compliance with
the accounting rules of the state in which it is established and permit direct
reconciliation of the costs incurred for the implementation of the action covered by the
EU grant with the overall statement of accounts relating to its overall activity.
[However, our audit opinion is qualified for:
costs of EUR [insert number]
receipts of EUR [insert number]
which in our opinion do not comply with the applicable rules.]
4. We are qualified/authorised to deliver this audit certificate [(for additional information,
see appendix to this certificate)].
5. The [beneficiary][affiliated entity] paid a price of EUR [insert number]) (including VAT
of EUR [insert number]) for this audit certificate. [OPTION 1: These costs are eligible
(i.e. incurred within 60 days of the end of the action referred to in Article 3 of the Grant
Agreement) and included in the financial statement.][OPTION 2: These costs were not
included in the financial statement.]
Date, signature and stamp
9
Digitally sealed by the European Commission
Date: 2021.07.13 23:15:17 CEST
This electronic receipt is a digitally signed version of the document submitted by your
organisation. Both the content of the document and a set of metadata have been digitally
sealed.
This digital signature mechanism, using a public-private key pair mechanism, uniquely
binds this eReceipt to the modules of the Funding & Tenders Portal of the European
Commission, to the transaction for which it was generated and ensures its full integrity.
Therefore a complete digitally signed trail of the transaction is available both for your
organisation and for the issuer of the eReceipt.
Any attempt to modify the content will lead to a break of the integrity of the electronic
signature, which can be verified at any time by clicking on the eReceipt validation
symbol.
More info about eReceipts can be found in the FAQ page of the Funding & Tenders
Portal.
(https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/support/faq)
Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. +32 22991111