RAIL BALTICA INFRASTRUCTURE
MANAGEMENT MODEL IMPLEMENTATION
Annual Progress Report No. 1
January 2021 – December 2021
Rail Baltica Infrastructure Management Model Implementation
Annual Progress Report No. 1 | January 2021 – December 2021
CONTENTS
BACKGROUND .......................................................................................................................................................... 3
PROGRESS OVERVIEW ........................................................................................................................................... 4
Action Plan overview .......................................................................................................................................... 4
Action Plan implementation - progress to date ...................................................................................... 5
CONCLUSION AND OUTLOOK ........................................................................................................................... 9
CONTACTS ............................................................................................................................................................... 10
Page 2 of 10
Rail Baltica Infrastructure Management Model Implementation
Annual Progress Report No. 1 | January 2021 – December 2021
BACKGROUND
Rail Baltica is a European Flagship Infrastructure project of common interest with the goal of
advancing the integration of the Baltic States into the trans-European transport network via a
new fully electrified, ERTMS-equipped 1435mm gauge double-track fast conventional railway
line and related infrastructure. Rail Baltica is a major missing link on the North Sea – Baltic
TEN-T Core Network Corridor and is expected to play a crucial role in ensuring the functioning
of this corridor with an interoperable and efficient connection of the Baltic States with Poland
and on to Finland, as well as multimodal connections between sea, rail and road transport.
In January 2017 the Baltic States have concluded an Intergovernmental Agreement on the
development of the Rail Baltica railway connection and have undertaken the commitment to
take coordinated approach concerning the future access to Rail Baltica railway infrastructure
and services, including levying of charges for the use of railway infrastructure, allocation of
railway infrastructure capacity and traffic management. It was also agreed that the most
effective and feasible infrastructure management model, with a view but not limited to the
aspects mentioned above, shall be determined and achieved in a joint and timely manner to
build confidence and achieve continuous engagement of institutional partners and contribute
to the long-term feasibility of project.
Recognizing the importance of a timely and informed selection of the infrastructure
management model for Rail Baltica, in 2019 the project stakeholders have undertaken joint
actions to address this topic and determine the feasible optimum solution.
It has been mutually shared that Rail Baltica is more than just a railway. The goal is to maximize
benefits for the society by creating a well-integrated economic corridor. Thus, the objective of
the Baltic States is to enable modal shift towards sustainable mobility in the Baltic region and
thus maximize passenger and freight flows on Rail Baltica. Rail Baltica shall result in an efficient
infrastructure that ensures the long-term socio-economic return on the European and national
investment, also contributing to the strategic priorities of the European Union, such as the
European Green Deal or the Single European Railway Area.
Key role in maximizing the socio-economic benefits will be played by the railway undertakings
- passenger and freight train operators and mobility and logistics service providers. In
consideration of the above, the defined underlying objective of the Rail Baltica infrastructure
management model is to curtail the administrative burden and provide equal, non-
discriminatory and easy access to infrastructure and its service facilities.
The identification of these common targets has allowed to shape and conceptually define the
Rail Baltica infrastructure management model as:
An integrated decision-making arrangement based on well-coordinated functions for
pricing, charging, capacity allocation, safety and traffic management, with emphasis on
common charging scheme with shared definitions, common capacity allocation
framework with harmonized rules and methodology, common network statement,
enhanced cooperation of national regulatory bodies and safety authorities and a seamless
railway operation with Poland.
Page 3 of 10
Rail Baltica Infrastructure Management Model Implementation
Annual Progress Report No. 1 | January 2021 – December 2021
During 2020, the Baltic States have taken the decisions to appoint entities responsible for the
Rail Baltica infrastructure management model development (AB “LTG Infra” in Lithuania, SIA
“Eiropas Dzelzceļa līnijas” in Latvia, OÜ “Rail Baltic Estonia” in Estonia) and pursuing further the
implementation of the defined Rail Baltica infrastructure management model.
On 6 November 2020, the 26th Baltic Council welcomed the decisions of the Baltic States to
designate the infrastructure managers (entities for the development of the infrastructure
management model) of Rail Baltica infrastructure and expressed the expectation for workable
and optimal solutions in continuing the development of the Rail Baltica infrastructure
management model.
On 21 December 2020, the Prime Ministers of the Baltic States have recognized the progress
achieved on the topic of Rail Baltica infrastructure management and encouraged to produce
an action plan for further development of the commonly agreed Rail Baltica infrastructure
management model.
To achieve these tasks, AB “LTG Infra”, SIA “Eiropas Dzelzceļa līnijas”, OÜ “Rail Baltic Estonia”
have agreed to work together and established a dedicated cooperation format – Expert
Working Group – with the role to develop and execute the Action Plan for Rail Baltica
infrastructure management model implementation, subject to approval by responsible
ministries of Latvia, Lithuania and Estonia (the “Action Plan”).
Action Plan has been developed in February 2021, following with the presentation and
endorsement in the dedicated inter-governmental governance structure of the Rail Baltica
project – the Rail Baltica Task Force – on 23 March 2021.
This report is dedicated to Action Plan implementation progress in 2021.
PROGRESS OVERVIEW
Action Plan overview
Management of railway infrastructure and the activities of rail transport in the European Union
operate under the framework provided by the European Union law.
In consideration of the applicable requirements and the overall scope of the railway
infrastructure management functionality, as well as the role and legal obligations of a railway
infrastructure manager, the following key topics have been identified as the areas of relevance
for the implementation of the Rail Baltica infrastructure management model and achieving the
objectives pertaining to it:
Page 4 of 10
Rail Baltica Infrastructure Management Model Implementation
Annual Progress Report No. 1 | January 2021 – December 2021
1 Unified performance framework
2 Uniform interface with railway undertakings
3 Common charging principles
4 Common capacity allocation
5 Cooperation that is extended beyond the railway infrastructure managers
6 Common safety management
7 Common external strategy
8 Extended cooperation beyond the Baltic States
9 Traffic management
10 Service facilities
11 Infrastructure maintenance strategy
12 Horizontal measures
The identified 12 (twelve) topics, divided into more specific actions with their implementation
timeline, covering the period up until the Rail Baltica railway operational phase, form the
Action Plan.
Action Plan implementation - progress to date
In total 45 meetings of the Expert Working Group have been held during 2021 for analyzing
the identified topics, with the key outcomes and results summarized below:
Page 5 of 10
Rail Baltica Infrastructure Management Model Implementation
Annual Progress Report No. 1 | January 2021 – December 2021
Unified performance framework
Railways Key Performance Indicators (KPIs) are vital to monitoring the performance of the
Infrastructure Manager (hereinafter – IM). They are credible, easily measurable and can serve as
a relevant metric that helps to monitor the performance of railway infrastructure. First set of KPI’s
was identified for the entire Rail Baltica railway line in the Baltic States based on a KPI Catalogue
which has been developed by the Platform of Rail Infrastructure Managers in Europe (hereinafter
– PRIME), describing the selected KPIs in a structured and prioritized way following the concept
1 of the balanced scorecard. As well the proposals of the Rail Baltica Infrastructure Management
study (Atkins 2019) have contributed to develop first set of the KPIs.
An overall approach to the Rail Baltica Global Project performance level has been set under the
Reliability, Availability Maintainability (hereinafter – RAM) documentation for Rail Baltica. Relevant
RAM targets have been set under Rail Baltica Design Guidelines for the whole Rail Baltica system,
which includes the development, operation and maintenance of infrastructure and rolling stock.
The most effective way to measure the system performance based on availability are delays and
cancelled runs. In principle, all the deviations from agreed performance level are not tolerable
and it’s expected that IMs will ensure the RAM targets on everyday operation.
Uniform interface with railway undertakings
Backbone of the Rail Baltica success will be the way how railway undertaking may access this
network. Our approach is to develop uniform interface for processing any applicant or railway
undertaking interactions to the infrastructure manager. These interactions may be related to the
minimum access package, service facilities and other services. Such uniform interface can be best
realized through a one-stop-shop or single contact point platform, which can be implemented as
a virtual, IT based, physical or other organisational solution. The main principle set for the uniform
interface is that the railway undertakings and other applicants will have just one entry point to
2 apply for the access to Rail Baltica railway infrastructure.
In addition, for the foreseen uniform way of the Rail Baltica line operations, a single network
statement (or other document, such as common information book) can be the best way how to
provide the necessary information concerning the services of the Rail Baltica line and the
conditions for access to them.
The preparation of such document will be continued further as soon as the relevant information
will be ready, with common requirements set out in the EU legislation, as well as harmonised
templates introduced by the RailNetEurope association facilitating this task.
Page 6 of 10
Rail Baltica Infrastructure Management Model Implementation
Annual Progress Report No. 1 | January 2021 – December 2021
Common charging principles
The activity of track access charging (TAC) includes the determination and collection of
charges for the use of Rail Baltica railway infrastructure. This is one of the essential functions of
the infrastructure manager, for which specific independence reqirements are set in the EU
legislation.
Following the main goal of having a common charging setup to the entire Rail Baltica railway
3 line, the initial step was to agree on the key principles for Rail Baltica TAC system, which have
been defined as:
• Setting the track access charge at the costs directly incurred by the train service should
not resolve to the IM either a net financial loss or a net financial gain;
• The IM is not allowed to recover the cost of investment in an asset where it is not
obliged to repay that cost;
• The IM includes in the calculation of its direct costs only costs that it can objectively
and robustly demonstrate that they are triggered directly by the operation of the train
service.
Common capacity allocation
The essence of allocation of infrastructure capacity is to provide the interested applicants the
possibility to schedule train paths on the Rail Baltica railway line for a certain period. This is one
of the essential functions of the infrastructure manager, for which specific independence
reqirements are set in the EU legislation.
In order to enable efficient allocation of infrastructure capacity on the Rail Baltica railway line,
the appropriate capacity allocation framework (procedures, principles and criteria) will have to
4 be put in place, ensuring at least the following:
• cover the main elements of the capacity allocation functionality, such as procedures,
deadlines, list of priorities on congested infrastructure, dispute resolution procedure,
publication, deadlines;
• consider the particularities of the traffic planning on the Rail Baltica line;
• provide the applicants with the possibility to apply to a one-stop-shop.
The implementation of capacity allocation framework on the Rail Baltica line will also require
enhanced cooperation between relevant regulatory bodies of the Baltic States, specifically
concerning the dispute resolution and supervision of rail services market.
Cooperation that is extended beyond the railway
5 infrastructure managers
Topic to be addressed in further stages of Rail Baltica infrastructure management model
implementation.
Common safety management
6
Topic to be addressed in further stages of Rail Baltica infrastructure management model
implementation.
Page 7 of 10
Rail Baltica Infrastructure Management Model Implementation
Annual Progress Report No. 1 | January 2021 – December 2021
Common external strategy
7
Topic to be addressed in further stages of Rail Baltica infrastructure management model
implementation.
Extended cooperation beyond the Baltic States
• Polish railway infrastructure manager has been invited to join dedicated cooperation format
of Rail Baltica infrastructure managers, for coordination of seamless cross-border operations
not only within the Baltic States, but also further along the North Sea-Baltic Corridor;
8
• Consultations conducted with existing organizations and cooperation platforms of the
European rail infrastructure managers, to learn about the ongoing as well as planned EU-
wide initiatives for cross-border operations, and to assess their relevance for Rail Baltica;
• Latvian and Estonian designated bodies joined PRIME platform as observers this year.
Traffic management
Traffic management functionality:
After analysing of different structural models for the traffic management functionality, the
following main principles have been defined:
• common operational rules;
• operational control centre in each country with common overall line supervision;
• single or interlinked traffic management systems;
• necessary interactions and possible synergies with the existing 1520 mm rail system
These principles shall serve as the initial input for the development and deployment of the Rail
Baltica control-command and signalling sub-system, with further solutions to be detailed and
necessary decisions taken during the Rail Baltica Global Project implementation phase.
9
Operating language:
For the operating language bilingual approach (common language as the preferable option
and the national language for the domestic traffic) with a dominance of common language use
is recommended, and English is recommended as a single language. The traffic controllers and
train drivers must have the necessary level of knowledge of the common language, which can
be reviewed if a reliable automatic translation tool for the traffic control purposes will be
developed and approved for use.
Also, the language use has been defined for the communication between IMs, communication
with passengers at stations, for the internal exchange of information for passengers, for internal
governance of the IM documents, for business communication with railway undertakings and
applicants.
Page 8 of 10
Rail Baltica Infrastructure Management Model Implementation
Annual Progress Report No. 1 | January 2021 – December 2021
Service facilities
Management model for each Rail Baltica service facility will be decided upon by the Baltic
State within whose territory the specific service facility is located.
10
If the co-operation and co-ordination of operations of certain service facilities may be useful in
order to ensure uniformity of services provided at the service facilities – among others in railway
stations and the freight terminals, or to increase the maintenance efficiency of similar
equipment, structures and buildings, the nature of such co-operation and co-ordination shall
be agreed on case-by-case basis.
Infrastructure maintenance strategy
Models for ensuring the maintenance functionality (regular maintenance, renewals, diagnostics)
of the Rail Baltica railway infrastructure were identified. It was established that renewals shall
11
be mostly outsourced and competitively tendered while the diagnostics and regular
maintenance could take a hybrid or inhouse approach, depending on the nature of works and
resources required/available. With such an approach we want to contribute to sustainable
supplier market development in railway sector in the Baltics.
Horizontal measures
• A dedicated working environment and platform for the Rail Baltica infrastructure
management model implementation has been put in place;
• Two-way information flow and alignment ensured between the implementation processes
12
of the Rail Baltica Global Project (development of the infrastructure) and the Rail Baltica
infrastructure management model, including collaboration and dedicated workshops with
the Rail Baltica joint venture RB Rail AS (specifically with regards to Shadow Operator
activities, Reliability, Availability, Maintainability, and Safety documentation preparation,
Safety Management System development, as well as the commercialization of the Rail
Baltica railway line).
CONCLUSION AND OUTLOOK
In 2021 the Expert Working Group has agreed on many important aspects for the
implementation and further designing of the infrastructure management model as presented
in previous chapter.
The key principles agreed towards single network statement, common capacity allocation,
operating rules and traffic management, notably agreeing on common operating
language and language use on and beyond railway operation form the first pilar of an efficient
and integrated railway infrastructure management model.
Page 9 of 10
Rail Baltica Infrastructure Management Model Implementation
Annual Progress Report No. 1 | January 2021 – December 2021
Second pillar – safety and performance has been established by the first set of KPIs to be
developed further as well as will be supported by an integrated infrastructure maintenance
model.
Third pillar – uniform interface with railway undertakings - one entry point to apply for the
access to Rail Baltica railway infrastructure, will be the key to address the railway service
offer to the market (railway undertakings).
With a view to Action plan implementation in 2022, the Expert Working Group will set Core
Topics for the next year’s agenda early 2022. One of the most important steps will be the
involvement of the stakeholders through a series of workshops, notably to discuss with the
market on how the uniform interface, capacity allocation and charging frameworks shall
facilitate maximization of train traffic on the railway line, thus maximizing the benefits of the
Rail Baltica Global Project.
CONTACTS
[email protected] [email protected] [email protected]
Endla 16, Ģenerāļa Radziņa krastmala 9, Geležinkelio g. 2,
10142 LV-1050 02100
Tallinn, Estonia Rīga, Latvia Vilnius, Lithuania
Page 10 of 10