dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Konkurentsiamet
Sissetulev kiriAvalik

Sissetulev kiri

Konkurentsiamet · 26. mai 2021
Viit
7-25/20-0151-261-31
Registreeritud
26. mai 2021
Dokumendi liik
Sissetulev kiri
Adressaat
Litgrid AB
Saabumis/saatmisviis
e-post
Funktsioon
7 Energiavaldkond
Sari
7-25 Elektrienergia võrgueeskirjade menetluste toimikud
Toimik
7-25/20-0151
Vastutaja
Karin Maria Lehtmets (Konkurentsiamet, Regulatsiooniteenistus, Energiaturgude osakond)
Lahendamise tähtaeg
25. juuni 2021

Failid

  • 📎E-kiri.pdf667 KB
  • 📎image003.jpg
  • 📎Power market manipulation 20210526.pdf171 KB

Sisu (failidest)

Saatja: Viktorija Čepytė <[email protected]> Saadetud: 25.05.2021 17:16 Adressaat: <[email protected]>; Konkurentsiamet <[email protected]>; <[email protected]>; <[email protected]>; <[email protected]> Koopia: Egidijus Bargaila <[email protected]>; Rimantas Redecki <[email protected]>; Donatas Matelionis <[email protected]> Teema: REGARDING THE POWER MARKET MANIPULATION IN THE BALTIC STATES DUE TO ARTIFICIALLY EXAGGERATED MAXIMUM NTC TRADE CAPACITIES IN LRI AND LRE AREAS SET BY AUGSTSPRIEGUMA TĪKLS AS Manused: image003.jpg; Power market manipulation 20210526.pdf Tähelepanu! Tegemist on välisvõrgust saabunud kirjaga. Tundmatu saatja korral palume linke ja faile mitte avada. Dear all, We write to inform you, that AST continues to use of the unenforceable 2020 Baltic Capacity Calculation Methodology with Russia and knowingly excessive NTC declarations from Russia to Latvia cause illegal utilization of Lithuanian infrastructure and influence market results despite the claim from LITGRID on 11th of May 2021. Please refer to the attached file for more details. Best regards, Viktorija Čepytė Senior engineer Schedule planning group System reliability division Litgrid AB Viršuliškių skg. 99B, LT-05131 Vilnius Tel. +370 707 02065 Mob. +370 696 02077 [email protected] www.litgrid.eu Šis el. laiškas skirtas tik jo adresatui. Šio el. laiško ir bet kokių jo priedų turinys gali būti konfidenciali informacija ir jos panaudojimas ar atskleidimas yra ribojamas. Jeigu Jūs nesate adresatas ar gavote šį el. laišką įvykus klaidai, Jūs neturite teisės šio el. laiško ar jo priedų atskleisti kitiems asmenims, kopijuoti ar kitaip platinti. Apie gautą el. laišką prašome nedelsiant informuoti siuntėją ir sunaikinti šį el. laišką ir bet kokius jo priedus, neišsaugant kopijų ir neatskleidžiant jo turinio. This e-mail is for the exclusive use of the intended recipient. The contents of this e-mail and any attachments may be confidential and are privileged or otherwise protected from disclosure. If you are not an intended recipient or you have received this e-mail mistakenly, you are hereby notified that any disclosure, copying or distribution of this information is strictly prohibited. Kindly inform the sender about this e- mail and delete the document and any attachment without retaining copies or disclosing its contents. E-mail recipients: Council of the Public Utilities Commission of the Republic of Latvia Unijas St. 45, Riga, 1039, Latvia E-mail: [email protected] Competition Authority of the Republic of Estonia Tatari St. 39, Tallinn, 10134, Estonia E-mail: [email protected] National Energy Regulatory Council of the Republic of Lithuania Verkių St. 25C-1, Vilnius, 08223, Lithuania E-mail: [email protected] Augstsprieguma tīkls AS Address: 86 Darzciema str., Rīga, LV-1073, Latvia E-mail: [email protected] Elering AS Kadaka Road 42, 12915 Tallinn E-mail: [email protected] REGARDING: THE POWER MARKET MANIPULATION IN THE BALTIC STATES DUE TO ARTIFICIALLY EXAGGERATED MAXIMUM NTC TRADE CAPACITIES IN LRI AND LRE AREAS SET BY AUGSTSPRIEGUMA TĪKLS AS We write to inform you, that AST continues to use of the unenforceable 2020 Baltic Capacity Calculation Methodology with Russia and knowingly excessive NTC declarations from Russia to Latvia cause illegal utilization of Lithuanian infrastructure and influence market results despite the claim from LITGRID on 11th of May 2021. Detailed information for coming day is provided in the table below. AST provided NTC of RU>LV exceed Planned physical NTC RU>LV maximum interconnection capacity utilziation of BY-LT LV and LT bidding LV congestion provided by AST RU>LV allocated Hours of RU>LV interconection zone price income on LV-LT Date to Day ahead flow (CET) (320 MW maximum interconnection due to the trade difference interconnection market capacity was declared by AST) from RU to LV MW MW % MWh/h MW Eur/MW kEur 00-01 700 380 119 700 360 37.16 41.879 01-02 700 380 119 700 358 32.19 36.278 02-03 700 380 119 700 358 30.27 34.114 03-04 700 380 119 700 357 29.68 33.449 04-05 700 380 119 700 361 21.08 23.757 05-06 700 380 119 700 356 06-07 700 380 119 100 51 07-08 700 380 119 100 50 08-09 700 380 119 100 50 09-10 700 380 119 100 51 2021.05.26 10-11 700 380 119 100 49 11-12 590 270 84 100 48 12-13 700 380 119 100 48 13-14 700 380 119 100 48 14-15 700 380 119 700 361 15-16 700 380 119 700 363 16-17 700 380 119 700 363 3.11 3.505 17-18 700 380 119 700 355 8.30 9.354 18-19 700 380 119 100 51 19-20 700 380 119 100 51 20-21 700 380 119 700 362 49.10 55.336 21-22 700 380 119 700 362 44.54 50.197 22-23 700 380 119 700 356 46.56 52.473 23-24 700 380 119 627.5 324 9.87 11.123 Average 695 375 118 447 229 28.35 Total 351.466
Allikas: Konkurentsiamet dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel