-864235 -144145 0 0 delta_recipientPersonName_1 \* MERGEFORMAT Mr Christian Faure delta_recipientName_1 \* MERGEFORMAT CINEA delta_recipientEmail_1 \* MERGEFORMAT
[email protected] /* Your ref delta_senderRegDate \* MERGEFORMAT {senderRegDate} */ /*n o delta_senderRegNumber \* MERGEFORMAT {senderRegNumber} */ Our ref delta_regDateTime \* MERGEFORMAT 13.10.2025 nr delta_regNumber \* MERGEFORMAT 5.2-1/21-968/17448-1 Final F inancial S tatement 202 3 -202 4 - Action n°– 2018-EE-TM-0029-M - "Dynamic traffic and truck parking management" - Grant Agreement number INEA/CEF/TRAN/M2018/1767529 Dear Mr . Faure Herby, the Estonian Transport Administration submits : The Individual Financial Statement for period from 2023 – 2024 Excel and PDF versions, which is signed and stamped and also certified by M r . Sander Salmu , Deputy Secretary General for Mobility at the Ministry of Climate of Estonia. Consolidated Financial Statement for period 2023 – 2024 Excel and PDF versions, which is signed and stamped. Audit report by Grant Thornton Baltic OÜ in the digitally signed envelope. Final Report Yours sincerely , ( Digitally signed ) delta_signerName \* MERGEFORMAT Priit Sauk Director General Enclosure : Individual financial statement (Excel and PDF versions), Consolidated Financial Statement (Excel and PDF versions) , Certificate Financial Statement and Final Report delta_ownerName \* MERGEFORMAT Janar Künamägi delta_ownerPhone \* MERGEFORMAT 58515235 , delta_ownerEmail \* MERGEFORMAT
[email protected]
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Independent Report of Factual Findings on costs declared under the Connecting Europe
Facility (CEF)
To
Priit Sauk, Director General
Estonian Transport Administration
Valge 4, 11413 Tallinn Estonia
10 October 2025
Dear Mr Priit Sauk,
As agreed under the terms of reference dated 12 September 2025
with Estonian Transport Administration (‘the Beneficiary’),
we
Grant Thornton Baltic OÜ (‘the Auditor’),
established at
Pärnu mnt 22 Tallinn Harjumaa 10141 Estonia,
represented by
Mart Nõmper, partner, sworn auditor,
have carried out the procedures agreed with you regarding the costs declared in the Financial
Statement(s)1 of the Beneficiary concerning the grant agreement INEA/CEF/TRAN/M2018/1767529,
“Dynamic traffic and truck parking management” (“the action”) (‘the Agreement’),
with a total cost declared of EUR 1 712 348,94,
and hereby provide our Independent Report of Factual Findings (‘the Report’) using the
compulsory report format agreed with you.
The Report
Our engagement was carried out in accordance with the terms of reference (‘the ToR’) appended to this
Report. The Report includes the agreed-upon procedures (‘the Procedures’) carried out and the standard
factual findings (‘the Findings’) examined.
The Procedures were carried out solely to assist the Agency in evaluating whether the Beneficiary’s
costs in the accompanying Financial Statement(s) were declared in accordance with the Agreement.
The Agency draws its own conclusions from the Report and any additional information it may require.
The scope of the Procedures was defined by the Agency. Therefore, the Auditor is not responsible for
their suitability or pertinence. Since the Procedures carried out constitute neither an audit nor a review
made in accordance with International Standards on Auditing or International Standards on Review
Engagements, the Auditor does not give a statement of assurance on the Financial Statements.
1
By which the Beneficiary declares costs under the Agreement (see template ‘Model Financial Statement(s)’
in Annex VI to the Agreement).
1
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Had the Auditor carried out additional procedures or an audit of the Beneficiary’s Financial Statements
in accordance with International Standards on Auditing or International Standards on Review
Engagements, other matters might have come to its attention and would have been included in the
Report.
Not applicable Findings
We examined the Financial Statement(s) stated above and considered the following Findings not
applicable:
Findings 9 to12 as “unit costs calculated by the Beneficiary in accordance with its usual cost accounting
practices” is not applied.
Findings 13 to 16 as there were no costs declared for natural persons working with the Beneficiary
under a direct contract other than an employment contract.
Finding 19 as there were no costs declared for employees not working full-time.
Finding 21 and 22 as the Beneficiary did not apply method C.
Finding 24 as Beneficiary did not apply Option I.
Findings 26 to 28 as no personnel costs were declared related to SME owners and natural persons not
receiving a salary.
Findings 29 to 32 as time recording system was not used – all persons were working exclusively for the
action without time records.
Finding 59 as the national law on public procurement transposing the Directives is applicable.
Finding 64 and 65 as no costs for providing financial support to third parties were declared.
Findings 66 to 70 as no travel and subsistence costs were declared.
Finding 72 and 73 as depreciation costs are not declared.
Finding 76 to 80 as no costs related to land and building acquisition were declared.
Findings 81 to 83 as no other direct costs not covered by categories D.1 to D.4 were declared.
Finding 84 as the Beneficiaries accounts are established in euros.
Finding 85 as no costs with other currencies that need converting to euros were declared.
Exceptions
Apart from the exceptions listed below, the Beneficiary provided the Auditor all the documentation and
accounting information needed by the Auditor to carry out the requested Procedures and evaluate the
Findings.
No exceptions
Further Remarks
In addition to reporting on the results of the specific procedures carried out, the Auditor would like to
make the following general remarks:
No remarks
Use of this Report
This Report may be used only for the purpose described in the above objective. It was prepared solely
for the confidential use of the Beneficiary and the Agency, and only to be submitted to the Agency in
connection with the requirements set out in Article II.23.2 of the Agreement. The Report may not be
2
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
used by the Beneficiary or by the Agency for any other purpose, nor may it be distributed to any other
parties.
The Agency may only disclose the Report to authorised parties, in particular to the European Anti-Fraud
Office (OLAF) and the European Court of Auditors.
This Report relates only to the Financial Statement(s) submitted to the Agency by the Beneficiary for
the Agreement. Therefore, it does not extend to any other of the Beneficiary’s Financial Statement(s).
There was no conflict of interest2 between the Auditor and the Beneficiary in establishing this Report.
The total fee paid to the Auditor for providing the Report was EUR 8059,80 (not including EUR 1934,35
of deductible VAT).
We look forward to discussing our Report with you and would be pleased to provide any further
information or assistance.
Grant Thornton Baltic OÜ
Mart Nõmper, partner, sworn auditor
10 October 2025
Signature of the Auditor
Annex 1: Implementation contracts list
Annex 2: Certified Financial Statement sampled transactions
2
A conflict of interest arises when the Auditor's objectivity to establish the certificate is compromised in fact
or in appearance when the Auditor for instance:
- was involved in the preparation of the Financial Statements or in providing consultancy advice on the
related operations or underlying transactions;
- stands to benefit directly should the certificate be accepted;
- has a close relationship with any person representing the beneficiary, the affiliated entity or the
implementing body;
- is a director, trustee or partner of the beneficiary, the affiliated entity or the implementing body; or
- is in any other situation that compromises his or her independence or ability to establish the certificate
impartially.
3
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Agreed-upon procedures to be performed and standard factual findings to be confirmed by the
Auditor
The Agency reserves the right to i) provide the Auditor with additional guidance regarding the
procedures to be followed or the facts to be ascertained and the way in which to present them (this may
include sample coverage and findings) or to ii) change the procedures, by notifying the Beneficiary in
writing. The procedures carried out by the Auditor to confirm the standard factual finding are listed in
the table below.
If this certificate relates to an Affiliated Entity or Implementing Body, any reference here below to ‘the
Beneficiary’ is to be considered as a reference to ‘the Affiliated Entity’ or 'Implementing Body'
respectively.
The ‘result’ column has three different options: ‘C’, ‘E’ and ‘N.A.’:
➢ ‘C’ stands for ‘confirmed’ and means that the Auditor can confirm the ‘standard factual finding’
and, therefore, there is no exception to be reported.
➢ ‘E’ stands for ‘exception’ and means that the Auditor carried out the procedures but cannot
confirm the ‘standard factual finding’, or that the Auditor was not able to carry out a specific
procedure (e.g. because it was impossible to reconcile key information or data were
unavailable),
➢ ‘N.A.’ stands for ‘not applicable’ and means that the Finding did not have to be examined by
the Auditor and the related Procedure(s) did not have to be carried out. The reasons of the non-
application of a certain Finding must be obvious i.e. i) if no cost was declared under a certain
category then the related Finding(s) and Procedure(s) are not applicable; ii) if the condition set
to apply certain Procedure(s) are not met then the related Finding(s) and Procedure(s) are not
applicable. For instance, for ‘beneficiaries with accounts established in a currency other than
the euro’ the Procedure related to ‘beneficiaries with accounts established in euro’ is not
applicable. Similarly, if no additional remuneration is paid, the related Finding(s) and
Procedure(s) for additional remuneration are not applicable.
Sampling Requirements and Reporting of Sampled Transactions
The sampling requirements for each cost category are defined in section A-F of the table below. The
sampled transactions overall must cover at least 10% of the total declared costs on the financial
statement.
If, following the sampling instructions in each section of the table below, an overall financial coverage
of 10% of declared costs is not obtained, additional transactions should be tested to achieve this
minimum financial coverage. The method used to select the additional transactions is at the discretion
of the auditor.
In order for CINEA to identify the sampled transactions, and verify the overall coverage target, the
auditor must provide the sampled transactions from the certified financial statement at Annex 2.
There is no requirement to separately identify transactions sampled under different cost categories.
4
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Result
Ref Procedures Standard factual finding
(C / E / N.A.)
ACTUAL PERSONNEL COSTS AND UNIT COSTS CALCULATED BY THE BENEFICIARY IN ACCORDANCE WITH ITS USUAL
A
COST ACCOUNTING PRACTICE
The Auditor draws a sample of persons whose costs were declared in the Financial Statement(s) to
carry out the procedures indicated in the consecutive points of this section A.
(The sample should be selected randomly so that it is representative. Full coverage is required if
there are fewer than 10 people (including employees, natural persons working under a direct
contract and personnel seconded by a third party), otherwise the sample should have a minimum
of 10 people, or 10% of the total personnel cost declared , whichever number is the highest)
The Auditor sampled 1 people out of the total of 1 people.
A.1 PERSONNEL COSTS
1) The employees i) were directly
For the persons included in the sample and working under an employment contract or equivalent hired by the Beneficiary in
act (general procedures for individual actual personnel costs and personnel costs declared as unit accordance with its national
costs)
legislation or seconded to the
To confirm standard factual findings 1-6 listed in the next column, the Auditor reviewed following beneficiary by a third party
information/documents provided by the Beneficiary: against payment, ii) under the C
o a list of the persons included in the sample indicating the period(s) during which they Beneficiary’s sole technical
worked for the action, their position (classification or category) and type of contract; supervision and responsibility
and iii) remunerated in
o the payslips of the employees included in the sample; accordance with the
Beneficiary’s usual practices.
o reconciliation of the personnel costs declared in the Financial Statement(s) with the
accounting system (project accounting and general ledger) and payroll system;
2) Personnel costs were recorded in
the Beneficiary's C
accounts/payroll system.
5
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Result
Ref Procedures Standard factual finding
(C / E / N.A.)
o information concerning the employment status and employment conditions of personnel
3) Costs were adequately supported
included in the sample, in particular their employment contracts or equivalent; C
and reconciled with the accounts
o the Beneficiary’s usual policy regarding payroll matters (e.g. salary policy, overtime policy, and payroll records.
variable pay);
4) Personnel costs did not contain C
o applicable national law on taxes, labour and social security and any ineligible elements.
o any other document that supports the personnel costs declared. 5) There were no discrepancies
The Auditor also verified the eligibility of all components of the retribution (see Article II.19.1 and between the personnel costs
II.19.2.a) of the Agreement) and recalculated the personnel costs for employees included in the charged to the action and the C
sample. costs recalculated by the
Auditor.
6) The personnel costs declared
were incurred within the
reporting period and free from C
non-eligible costs set out in
Article II.19.4 of the Agreement.
6
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Result
Ref Procedures Standard factual finding
(C / E / N.A.)
Further procedures if ‘additional remuneration’ is paid
7) The amount of additional
To confirm standard factual findings 7-8 listed in the next column, the Auditor: remuneration paid corresponded
o reviewed relevant documents provided by the Beneficiary (legal form, legal/statutory to the Beneficiary’s usual
obligations, the Beneficiary’s usual policy on additional remuneration, criteria used for its remuneration practices and was C
calculation…); consistently paid whenever the
same kind of work or expertise
o recalculated the amount of additional remuneration eligible for the action based on the
was required.
supporting documents received (full-time or part-time work, exclusive or non-exclusive
dedication to the action, etc.) to arrive at the applicable full time equivalent (FTE)/year and
pro-rata rate (see data collected in the course of carrying out the procedures under A.2 8) The criteria used to calculate the
‘Productive hours’ and A.4 ‘Time recording system’). additional remuneration were
applied by the Beneficiary
C
regardless of the source of
funding used.
Additional procedures in case “unit costs calculated by the Beneficiary in accordance with its
usual cost accounting practices” is applied: 9) The personnel costs included in
the Financial Statement were
Apart from carrying out the procedures indicated above to confirm standard factual findings 1-6
calculated in accordance with N.A
and, if applicable, also 7-8, the Auditor carried out following procedures to confirm standard factual
findings 9-12 listed in the next column: the Beneficiary's usual cost
accounting practice.
o obtained a description of the Beneficiary's usual cost accounting practice to calculate unit
costs;
10) The employees were charged N.A
under the correct category.
7
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Result
Ref Procedures Standard factual finding
(C / E / N.A.)
o reviewed whether the Beneficiary's usual cost accounting practice was applied for the
11) Total personnel costs used in
Financial Statements subject of the present CFS;
calculating the unit costs were
o verified the employees included in the sample were charged under the correct category (in consistent with the expenses N.A
accordance with the criteria used by the Beneficiary to establish personnel categories) by recorded in the statutory
reviewing the contract/HR-record or analytical accounting records; accounts.
o verified that there is no difference between the total amount of personnel costs used in
calculating the cost per unit and the total amount of personnel costs recorded in the statutory
accounts; 12) Any estimated or budgeted
o verified whether actual personnel costs were adjusted on the basis of budgeted or estimated element used by the
elements and, if so, verified whether those elements used were relevant for the calculation, Beneficiary in its unit-cost
reasonable and correspond to objective and verifiable information supported by documents; calculation were relevant for N.A
calculating personnel costs and
o verified that unit costs were calculated in accordance with the methodology laid down in
corresponded to objective and
Commission Decision C(2016) 478 of 3.2.2016 on the reimbursement of personnel costs of
verifiable information.
beneficiaries of the Connecting Europe Facility.
13) The natural persons reported to
For natural persons included in the sample and working with the Beneficiary under a direct contract
other than an employment contract, such as consultants. the Beneficiary (worked under
the conditions similar to those
To confirm standard factual findings 13-16 listed in the next column the Auditor reviewed
of an employee: in particular
following information/documents provided by the Beneficiary: N.A
regarding the way the work is
o the contracts, especially the cost, contract duration, work description, place of work, organised, the tasks that are
ownership of the results and reporting obligations to the Beneficiary; performed and the premises
where they are performed).
8
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Result
Ref Procedures Standard factual finding
(C / E / N.A.)
o the employment conditions of staff in the same category to compare costs and;
o any other document that supports the costs declared and its registration (e.g. invoices, 14) The results of work carried out
accounting records, etc.). belong to the Beneficiary N.A
(unless exceptionally agreed
otherwise).
15) Their costs were not
significantly different from
those for staff who perform N.A
similar tasks under an
employment contract with the
Beneficiary.
16) The costs were supported by
audit evidence and registered in N.A
the accounts.
A.2 PRODUCTIVE HOURS
17) The Beneficiary applied
To confirm standard factual findings 17-22 listed in the next column, the Auditor reviewed relevant method
documents, especially national legislation, labour agreements and contracts and time records of the
B: the ‘total number of hours C
persons included in the sample, to verify that:
worked’
9
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Result
Ref Procedures Standard factual finding
(C / E / N.A.)
o the annual productive hours applied were calculated in accordance with one of the methods
18) Productive hours were C
described below;
calculated annually.
o the full-time equivalent (FTEs) ratios for employees not working full-time were correctly
calculated. 19) For employees not working
full-time the full-time N.A
If the Beneficiary applied method B, the Auditor verified that the correctness in which the total equivalent (FTE) ratio was
number of hours worked was calculated and that the contracts specified the annual workable hours. correctly applied.
If the Beneficiary applied method C, the Auditor verified that the ‘annual productive hours’ applied
when calculating the hourly rate were equivalent to at least 90 % of the ‘standard annual workable If the Beneficiary applied
hours’. The Auditor can only do this if the calculation of the standard annual workable hours can
method B.
be supported by records, such as national legislation, labour agreements, and contracts.
20) The calculation of the number
Beneficiary's Productive hours' for persons working full time shall be one of the following of ‘annual workable hours’, C
methods:
overtime and absences was
A. 1720 hours for persons working full time (or corresponding pro-rata for persons not working verifiable based on the
full-time); documents provided by the
B. the total number of hours worked by the person for the beneficiary in the year (this method is Beneficiary.
also referred to as ‘total number of hours worked’ in the next column). The calculation of the
total number of hours worked was done as follows: annual workable hours of the person If the Beneficiary applied
according to the employment contract, applicable labour agreement or national law plus method C.
overtime worked minus absences (such as sick leave or special leave); 21) The calculation of the number
C. the standard number of annual hours generally applied by the beneficiary for its personnel in of ‘standard annual workable N.A
accordance with its usual cost accounting practices (this method is also referred to as ‘total hours’ was verifiable based on
annual productive hours’ in the next column). This number must be at least 90% of the the documents provided by the
standard annual workable hours. Beneficiary.
10
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Result
Ref Procedures Standard factual finding
(C / E / N.A.)
22) The ‘annual productive hours’
'Annual workable hours’ means the period during which the personnel must be working, at the used for calculating the hourly
employer’s disposal and carrying out his/her activity or duties under the employment contract, rate were consistent with the
applicable collective labour agreement or national working time legislation. N.A
usual cost accounting practices
of the Beneficiary and were
equivalent to at least 90 % of
the ‘annual workable hours’.
11
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Result
Ref Procedures Standard factual finding
(C / E / N.A.)
A.3 HOURLY PERSONNEL RATES
23) The Beneficiary applied
I) For unit costs calculated in accordance to the Beneficiary's usual cost accounting practice (unit Option II: Individual hourly
costs): rates were applied
The Auditor:
o reviewed the documentation provided by the Beneficiary, including manuals and internal
guidelines that explain how to calculate hourly rates;
o recalculated the unit costs (hourly rates) of staff included in the sample following the results
of the procedures carried out in A.1 and A.2.
II) For individual hourly rates:
C
The Auditor:
o reviewed the documentation provided by the Beneficiary, including manuals and internal
guidelines that explain how to calculate hourly rates;
o recalculated the hourly rates of staff included in the sample following the results of the
procedures carried out in A.1and A.2.
“Unit costs calculated by the Beneficiary in accordance with its usual cost accounting practices”:
It is calculated by dividing the total amount of personnel costs of the category to which the
employee belongs verified in line with procedure A.1 by the number of FTE and the annual total
productive hours of the same category. calculated by the Beneficiary in accordance with procedure
A.2.
Hourly rate for individual actual personal costs:
12
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Result
Ref Procedures Standard factual finding
(C / E / N.A.)
It is calculated by dividing the total amount of personnel costs of an employee verified in line with For Option I concerning unit costs:
procedure A.1 by the number of annual productive hours verified in line with procedure A.2.
24) The unit costs re-calculated by
the Auditor were the same as N.A
the rates applied by the
Beneficiary.
For Option II concerning individual
hourly rates:
25) The individual rates re-
C
calculated by the Auditor were
the same as the rates applied by
the Beneficiary.
A.4 SME OWNERS AND NATURAL PERSONS NOT RECEIVING A SALARY
26) For SME owners and natural
The Auditor: persons not received a salary,
o verified that the unit per hour worked on the action was calculated in accordance with the the direct personnel costs have N.A
methodology laid down in Commission Decision C(2016)478 of 3 February 2016; been declared based on a unit
costs per hour worked on the
o verified that the total number of hours declared, in a year, for one SME owner not receiving a
action.
salary is not higher than 1 720 hours.
27) The unit costs declared were
calculated in accordance with
“Unit costs for SME owners and natural persons not receiving a salary”:
Commission Decision N.A
The direct personnel costs of SMEs owners not receiving a salary shall be based on a unit cost per C(2016)478
hour worked on the action to be calculated as follows:
13
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Result
Ref Procedures Standard factual finding
(C / E / N.A.)
{Monthly living allowance fixed at EUR 4 650 multiplied by the country-specific correction
28) The total number of hours
coefficient as set out in the Appendix of Commission Decision C(2016)478} divided by 143 hours
declared in a year do not
The value of the work of the SME owners not receiving a salary shall be determined by multiplying exceed 1 720 hours
the unit cost by the number of actual hours worked on the Action. N.A
The standard number of annual productive hours per SME owner is equal to 1 720 hours. The total
number of hours declared, in a year, in EU and Euratom grants for one SME owner not receiving
a salary may not be higher than the standard number of annual productive hours (1 720 hours).
A.5 TIME RECORDING SYSTEM
29) All persons recorded their time
To verify that the time recording system ensures the fulfilment of all minimum requirements and dedicated to the action on a
that the hours declared for the action were correct, accurate and properly authorised and supported daily/ weekly/ monthly basis N.A
by documentation, the Auditor made the following checks for the persons included in the sample
using a paper/computer-
that declare time as worked for the action on the basis of time records:
based system.
o description of the time recording system provided by the Beneficiary (registration,
authorisation, processing in the HR-system); 30) Their time-records were
o its actual implementation; authorised at least monthly by N.A
the project manager or other
o time records were signed at least monthly by the employees (on paper or electronically) and superior.
authorised by the project manager or another manager;
o the hours declared were worked within the reporting period; 31) Hours declared were worked
within the reporting period and
o there were no hours declared as worked for the action if HR-records showed absence due to were consistent with the N.A
holidays or sickness (further cross-checks with travels are carried out in B.1 below) ; presences/absences recorded in
HR-records.
14
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Result
Ref Procedures Standard factual finding
(C / E / N.A.)
o the hours charged to the action matched those in the time recording system.
Only the hours worked on the action can be charged. All working time to be charged should be
recorded throughout the duration of the REPORTING PERIOD, adequately supported by evidence 32) There were no discrepancies
of their reality and reliability (see specific provisions below for persons working exclusively for between the number of hours N.A
the action without time records). charged to the action and the
The time recording system should record all working time including absences and may be paper number of hours recorded.
or electronically based. The time records must be approved by the persons working on the action
and their supervisors, at least monthly. The absence of an adequate time recording system is
considered to be a serious and systematic weakness of internal control.
If the persons are working exclusively for the action and without time records 33) The exclusive dedication is
For the persons selected that worked exclusively for the action without time records, the Auditor supported by a declaration
verified evidence available demonstrating that they were in reality exclusively dedicated to the signed by the Beneficiary’s and C
action and that the Beneficiary signed a declaration confirming that they have worked exclusively by any other evidence
for the action. gathered.
15
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
B AWARDED CONTRACTS NECESSARY FOR THE IMPLEMENTATION OF THE ACTION
B.1 Assessment of the procurement process
The Auditor obtained the detail/breakdown of procured costs and sampled contracts selected
randomly for testing of the applied procurement procedure (full coverage is required if there are
fewer than 5 contracts, otherwise the sample should have a minimum of 5 contracts, or 10% of the
total number of contracts, whichever number is the highest).
In order to select the sample, a full schedule of all contracts awarded relevant to the costs
declaration certified was made available for the Auditor including the name of the Contracting
Authority /Entity, supplier name, subject of the contract, type of procurement procedure applied,
level and means of advertisement (including references to contract notices and contract award
notices or other means), the initial contract value and the aggregate value including all subsequent 34) The required information on all
amendments to the original contract and date of publication of the relevant tender or at least the contracts signed relevant to the
date of the award of the contract if no publication took place. costs declared was provided by C
This schedule should be attached to the CFS as Annex 1 the beneficiary in order to
To confirm standard factual finding 31-59 listed in the next column, the Auditor reviewed the select the sample.
following for the items included in the sample:
B.1.1) THE NATIONAL LAW TRANSPOSING THE EU DIRECTIVES ON PUBLIC
PROCUREMENT PROCEDURES IS APPLICABLE TO THE CONTRACT(S) IN
QUESTION
If this is not applicable, go directly to section B.1.2
From the sampled contracts, the Auditor verified that (35-52):
o the contracted tasks are relevant for the activities (or sub-activities) defined in the Agreement
(Article 1 and Annex I of the Agreement); 35) The contracted works/ services/
o the contracts were not awarded to other Beneficiaries listed in the Agreement (in such cases, supplies were linked to the C
the costs should be declared on an actual cost basis by the co-beneficiary and not as a profit activities covered in the
generating contract between beneficiaries); Agreement.
16
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
o there were signed contracts between the Beneficiary and the contractor;
36) The contracts were not signed C
o there was evidence that the contract was executed by the contractor (i.e. services were with other co- Beneficiaries
provided, works/supply were delivered).
o the procurement procedure used was in compliance with the national law transposing the EU 37) The Beneficiary provided
legal framework (EU Directive(s) on public procurement); original signed contracts with C
the contractor.
o the respective EU public procurement thresholds were not bypassed by artificial contract
splitting by the beneficiary;
38) The Beneficiary provided
(This can be considered by examining the list of all contracts signed (obtained under section adequate evidence that the
B.1.1) above), their value and type of procedure. If the subjects of several contracts are so C
services/ works were provided
closely linked to another one in the cost claim, that they could or should have been tendered
together, and the concerned contracts – usually below EU thresholds - were awarded to the by the contractors.
same contractor(s), the auditor provides a clear explanation of why each contract had to be
considered as separate procurement exercise); 39) The contract(s) in question falls
within the scope of application
o adequate justification is provided on the use of negotiated procedures with or without prior C
call for competition under the national law transposing the relevant EU public procurement of the national law transposing
Directives; the EU Directives on public
procurement procedures.
o Publicity was ensured during the tendering process in line with the national legislation
(contract notice, contract award notice is available or level of publicity is satisfactory if prior
40) No indications of artificial
publication in the Official Journal is not needed).
contractual splitting aimed at
o the deadline for submitting requests to participate/tenders was consistent with the national / avoiding the application of the
European legal framework;
national law transposing the EU
o the procedure was sufficiently transparent and non-discriminatory (the selection and award Directives on public
criteria enabled fair competition and did not unfairly favour any bidder); procurement procedures were C
o the selection and award criteria were predefined in the contract notice / tender specifications observed based on the review
and were not changed during the evaluation process; of the complete contract listing.
o the evaluation was sufficiently documented, with a clear audit trail leading to the selection (When indications are noted
of the contractor recommended by the evaluation process;
the Auditor explains the
reasons provided by the
17
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
o exclusions / rejections during the tender evaluation were compliant with the tender Beneficiary under the caption
specifications and could be validated by the Auditor; "Exceptions" of the Report. The
o the amount, duration and conditions of the contract signed following the award process were Agency will analyse this
consistent with the provisions stipulated in the procurement documents; information to evaluate
In the case of post contract award amendments, the Auditor verified that (60-63): whether these costs might be
accepted as eligible).
o the beneficiary has produced documented technical and legal justification for the amendment,
and its compliance with the requirements of the applicable national law transposing the EU
41) The procurement procedure
Directives on public procurement procedures;
selected was in compliance
o the amendments signed were compliant with national law transposing the EU Directives (a with the national law
strict interpretation of the requirements of the national transposing the Directives is required
transposing the EU Directives
as the use of negotiated procedures without prior call for competition always constitute an
exception and shall be justified under Article 31 of Directive 2004/18/EC or Article 40 of on public procurement
Directive 2014/17/EC by the party seeking to rely on their use) or the amendments are (justification was provided on the C
compliant with Article 72 of Directive 2014/24/EU or Article 89 of Directive 2014/25/EU if use of negotiated procedures with
the national transposing these Directives was applicable to the contract in question;
or without prior call for competition
o amendments do not introduce changes which are materially different in character from the under the national law transposing
conditions of the original contract showing the intention to renegotiate essential terms of the the relevant EU public procurement
contract;
Directives)
o amendments do not introduce conditions which, had they been part of the initial award
procedure, would have allowed for the admission of tenderers other than those initially 42) The conditions for publication
admitted or would have allowed for the acceptance of a tender other than the one initially according to national law
accepted;
transposing the EU law were C
o the scope of the contract has not been extended considerably to encompass services not respected (contract notice /
covered initially; contract award notice where
applicable) .
18
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
o the economic balance of the contract has not changed in favour of the supplier in a manner
43) The deadlines to request
which was not provided for in the terms of the initial procurement documents.
participation, submit tenders, or
o Where the national law transposing Directives 2014/24/EU or 2014/25/EU is applicable and ask for information were
a new contractor replaces the one to which the contract was initially awarded the amendment
compliant with the C
is in line with Article 72(1)(d) of Directive 2014/24/EU or Article 89(1)(d) of Directive
2014/25/EU: there is either (1) an unequivocal review clause or option or , (2) a universal or requirements of the applicable
partial succession of the initial contractor and the new contractor fulfils the criteria for national law transposing the EU
qualitative selection without modifying substantially the contractor or (3) the contracting Directives on public
authority assumes itself the role of the main contractor. procurement.
o Where the national law transposing Directives 2014/24/EU or 2014/25/EU is applicable the 44) The procurement procedures
value of the modification is below the applicable threshold and 10 % of the initial contract applied were transparent and C
value for service and supply contracts and 15% of the initial contract value for works
non-discriminatory.
contracts.
45) The selection and award criteria
were published in the contract
notice / tender specifications.
No changes to the exclusion / C
selection / award criteria were
made after the submission of
tenders.
46) The evaluation was based on
pre-defined criteria. The award
decision was consistent with the
C
results obtained and the contract
was awarded to the best ranked
tender.
19
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
47) In case of tenders
excluded/rejected during the
evaluation process the
exclusion/rejection was
justified and consistent with the C
requirements in the contract
notice / tender specifications
(exclusion, selection and award
criteria).
48) The amount, duration and
conditions of the contract
signed following the award
process were consistent with C
the winning tender and tender
specifications.
49) The contractual amendments
signed were compliant with
national law transposing the
C
relevant EU Directives.
C
50) In case of amendments, the
beneficiary has produced
documented technical and legal
20
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
justification for the
amendment, and its compliance
with the requirements of the
applicable national law
transposing the EU Directives
on public procurement.
51) In case of amendments the
scope of the contract has not
been extended considerably to C
encompass services not
covered initially.
52) In case of amendments the
economic balance of the
contract has not changed in
favour of the supplier in a
C
manner which was not
provided for in the terms of the
initial procurement documents.
21
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
B.1.2) FOR ALL CONTRACTS, THE AUDITOR VERIFIED THAT (57-58):
To confirm standard factual finding 53-59 listed in the next column, the Auditor reviewed the
following for the items included in the sample: 53) The required information on all
o the contracted tasks are relevant for the activities (or sub-activities) defined in the Agreement contracts signed relevant to the
(Article 1 and Annex I of the Agreement); costs declared was provided by C
the beneficiary in order to
o the Beneficiary followed their usual procurement rules;
select the sample.
o supporting documents on the selection and award procedure demonstrate that the selected
contractor offered the best value (or lowest price) according to the criteria defined by the
beneficiary;
54) The contracted works/ services/
o original tenders of all tenderers were reviewed and consistent with the evaluation documents
supplies were linked to the
(entity name / price/submission date) - (Article II.27.2 GA);
activities covered in the C
o the Beneficiary ensured that there was no conflict of interest when selecting and awarding Agreement.
the contract to the contractor.
o the contracts were not awarded to other Beneficiaries listed in the Agreement (in such cases,
the costs should be declared on an actual cost basis by the co-beneficiary and not as a profit
55) The contracts were not signed
generating contract between beneficiaries);
with other co- Beneficiaries C
o there were signed contracts between the Beneficiary and the contractor;
o there was evidence that the contract was executed by the contractor (i.e. services were
provided, works/supply were delivered). 56) The Beneficiary provided
o In the award of the audited contracts, the principle of sound financial management and basic signed contracts with the C
principles of the Treaty of the Functioning of the European Union are respected contractor.
(transparency, equal treatment, non-discrimination).
In case there is a cross-border interest, if an adequate level of publicity has been ensured and 57) The Beneficiary provided
the provisions of Commission Communication 2006/C 179/02 have been respected. adequate evidence that the
C
services/ works were provided
by the contractors.
22
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
58) The principle of sound
financial management and
basic principles of the Treaty C
(transparency, equal treatment,
non-discrimination) are
respected.
59) For Beneficiaries acting as
Contracting Authorities or
Contracting Entities, in case
the national law on public
procurement transposing the
Directives is not or only
partially applicable due to
exceptions provided by the N.A
Directives and there is a cross-
border interest, verify if an
adequate level of publicity has
been ensured in line with
Commission Communication
2006/C 179/02.
B.2 Transaction controls for procurement related costs
60) The costs declared were
In section B.1, the contract award and post contract award process was verified in order to test incurred within the reporting
compliance with Article II.9 of the Grant Agreement. The purpose of this section is to verify if the period and free from non-
costs declared arising from the contracting procedures are eligible in line with Article II.19 of C
eligible costs set out in Article
the grant agreement.
II.19.4 of the Agreement.
23
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
Based on the contracts sampled in section B.1, the Auditor randomly sampled at least 10%
61) The declared costs were
of the total value of costs declared for each procurement procedure selected under section
B.1 in order to verify if the declared costs were incurred in compliance with the grant agreement accounted according to the C
eligibility conditions defined in article II.19 (full coverage is required if there are fewer than 5 Beneficiary's usual accounting
transactions per contract, otherwise the sample should have a minimum of 10% of the total value practice
of costs declared per contract.
62) The declared costs were
covered by the activities in the C
Agreement
63) In the case of contractual C
amendments, the conditions
under B1.1 were respected and
the related costs are considered
eligible.
24
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
C COSTS OF PROVIDING FINANCIAL SUPPORT TO THIRD PARTIES
C.1 The Auditor obtained the detail/breakdown of the costs of providing financial support to
64) Article II.11 applies (Article
third parties and sampled ______ cost items selected randomly (full coverage is required if
there are fewer than 5 items, otherwise the sample should have a minimum of 5 item, or 10% of the 17) and all minimum
total costs declared under this category, whichever number is the highest). conditions were met.
If the possibility to give financial support to third parties is provided for in the Agreement (Article N.A
17 of the Agreement), the Auditor verified that the following minimum conditions were met:
a) the maximum amount of financial support for each third party did not exceed EUR 60 000,
unless it is the primary aim of the action as specified in Annex I of the Agreement;
b) the financial support to third parties was agreed in Annex I of the Agreement and the other
provisions on financial support to third parties included in Annex I were respected (i.e. the
criteria for determining the exact amount of the financial support, the different types of 65) The costs declared were
activity that may receive financial support on the basis of a fixed list, the definition of the incurred within the reporting
persons or categories of persons which may receive financial support, the criteria for giving period and free from non-
the financial support); eligible costs set out in Article
II.19.4 of the Agreement. N.A
c) in case the financial support takes the form of a prize, the financial support to third parties
was given in accordance with the conditions specified in Annex I of the Agreement,
including inter alia the conditions for participation, the award criteria, the amount of the prize
and the payment arrangements.
D OTHER ACTUAL DIRECT COSTS
D.1 COSTS OF TRAVEL AND RELATED SUBSISTENCE ALLOWANCES
66) Costs were incurred, approved
The Auditor obtained the detail/breakdown of travel and subsistence costs and sampled _ and reimbursed in line with the
cost items selected randomly (full coverage is required if there are fewer than 10 items, otherwise N.A
Beneficiary's usual policy for
travels.
25
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
the sample should have a minimum of 5 items, or 10% of the total costs declared under this
67) There was a link between the N.A
category, whichever number is the highest)
trip and the action.
The Auditor inspected the sample and verified that: 68) The supporting documents
were consistent with each other
o travel and subsistence costs were consistent with the Beneficiary's usual policy for travel. In
regarding subject of the trip, N.A
this context, the Beneficiary provided evidence of its normal policy for travel costs (e.g. use
dates, duration and reconciled
of first class tickets, reimbursement by the Beneficiary on the basis of actual costs, a lump
with time records and
sum or per diem) to enable the Auditor to compare the travel costs charged with this policy;
accounting.
o travel costs are correctly identified and allocated to the action (e.g. trips are directly linked to
the action) by reviewing relevant supporting documents such as minutes of meetings,
69) No ineligible costs or excessive
workshops or conferences, their registration in the correct project account, their consistency N.A
or reckless expenditure was
with time records or with the dates/duration of the workshop/conference;
declared.
o no ineligible costs or excessive or reckless expenditure was declared (see Articles II.19.3
and II.19.4 of the Agreement).
70) The costs declared were
incurred within the reporting
period and free from non- N.A
eligible costs set out in Article
II.19.4 of the Agreement.
26
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
D.2 COSTS FOR EQUIPMENT, INFRASTRUCTURE OR OTHER ASSETS
The Auditor obtained the detail/breakdown of equipment, infrastructure and other assets
and sampled 8 cost items selected randomly (full coverage is required if there are fewer than 10
items, otherwise the sample should have a minimum of 5 items, or 10% of the total costs declared
under this category, whichever number is the highest). 71)
In addition to the verifications listed under point B.1.1) (standard findings 34-52) or, if applicable, The full purchase costs are
also under point B.1.2) (standard findings 53-59), the Auditor performed the following: eligible in accordance with C
o If only the depreciation costs are eligible in accordance with Article II.19.2 (c) of the Article II.19.2 (c) of the
Agreement: the Auditor recalculated the depreciation costs and verified that they were in Agreement].
line with the applicable rules in the international accounting standards and the usual
accounting practices of the Beneficiary (e.g. depreciation calculated on the acquisition
value);
o The extent to which the assets were used for the action (as a percentage) was supported by 72) Where only depreciation costs
reliable documentation (e.g. usage overview table); are eligible, the depreciation
method used to charge the asset
o The Auditor verified that no ineligible costs such as deductible VAT, exchange rate losses,
to the action was in line with N.A
excessive or reckless expenditure were declared (see Articles II.19.3 and II.19.4 of the
the applicable rules of the
Agreement);
Beneficiary's country and the
o Costs of contracts for goods, works or services or of subcontracts are considered to be Beneficiary's usual accounting
incurred when the contract or subcontract (or part of it) is executed, i.e. when the goods, policy.
works or services (including studies) are supplied, delivered or provided (see Article II.19.1
73) Where only the depreciation
of the Agreement).
costs are eligible, the amount N.A
charged corresponded to the
actual usage for the action.
27
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
74) Where the full purchase costs
are eligible, the assets
purchased are treated as capital
expenditure in accordance with
the tax and accounting rules C
applicable to the beneficiary,
and are recorded in the fixed
assets account of its balance
sheet.
D.3 COSTS OF SUBCONTRACTING in line with Article II. 10.2
The Auditor obtained the detail/breakdown of subcontracting costs and sampled 10 cost
items selected randomly (full coverage is required if there are fewer than 10 items, otherwise the 75) The use of claimed
sample should have a minimum of 5 items, or 10% of the total costs declared under this category, subcontracting costs was
whichever number is the highest).
foreseen in Annex I for all
For the items included in the sample, in addition to the verifications listed under point B.1.1) sectors of CEF and for CEF
(standard findings 34-52) or, if applicable, also under point B.1.2) (standard findings 53-59), the Telecom the costs were C
Auditor reviewed the following in order to confirm standard factual finding 75 in the next column:
declared in Annex III and the
o the use of subcontractors was foreseen in Annex I or communicated by the coordinator and Financial Statements under the
approved by the Commission (see Article II.10.2 of the Agreement); subcontracting category.
o for Agreements signed under the CEF-Telecom, subcontracting costs were declared in the
subcontracting category of Annex III and the Financial Statement.
D.4 COSTS RELATED TO LAND AND BUILDING ACQUISITION
76) Land / building acquisition
Only applicable for Agreements signed under the CEF-Transport, which specifically provide costs are eligible in accordance
for the eligibility of land and building acquisition. N.A
with Article 15 of the
Agreement.
28
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
The Auditor obtained the detail /breakdown of land and building acquisition costs and
77) Costs were allocated to the
sampled ______ cost items selected randomly (full coverage is required if there are fewer than N.A
10 items, otherwise the sample should have a minimum of 5 items, or 10% of the total costs declared correct action.
under this category, whichever number is the highest).
For the purchase of land included in the sample the Auditor verified that: 78) Costs do not exceed the
o the costs of purchase of land not built on and land built on were eligible in accordance with maximum ceiling as specified N.A
Article 15 of the Agreement and did not exceed 10 % of the total eligible costs of the action; in the Agreement.
o the costs of purchase of derelict sites and purchase of sites formerly in industrial use which
79) Costs were charged in line with
comprise buildings were eligible in accordance with Article 15 of the Agreement and did not
the Beneficiary’s accounting
exceed 15 % of the total eligible costs of the action; N.A
policy and were adequately
o the costs did not exceed the limit agreed upon in the Agreement for operations concerning supported.
environmental conservation (Article 15 of the Agreement);
o they were correctly identified, and allocated to the proper action. 80) The costs declared were
The Auditor verified that no ineligible costs were declared (Articles II.19.3 and II.19.4 of the incurred within the reporting
Agreement). period and free from non- N.A
eligible costs set out in Article
II.19.4 of the Agreement.
D.5 OTHER DIRECT COSTS NOT COVERED BY CATEGORIES D.1-D.4
81) The cost allocation of the
The Auditor obtained the detail/breakdown of other direct costs and sampled ______ cost declared costs was consistent
items selected randomly (full coverage is required if there are fewer than 10 items, otherwise the with the activities performed
sample should have a minimum of 5 items, or 10% of the total costs declared under this category, N.A
and the activities covered by
whichever number is the highest).
the Agreement.
29
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
The Auditor inspected the sample and verified that:
82) The costs declared were
o costs are relevant for the activities (or sub-activities) defined in the Agreement (Article 1 and incurred within the reporting
Annex I of the Agreement); period and free from non-
o the declared costs were allocated to the correct activity (or sub-activity) as defined in the eligible costs set out in Article N.A
Agreement; II.19.4 of the Agreement.
o the declared costs were incurred during the reporting period covered by the cost declaration;
o the declared costs were accounted in line with the beneficiary's usual accounting practice;
o 'The Auditor verified that no ineligible costs such as deductible VAT, exchange rate losses, 83) The declared costs were
excessive or reckless expenditure were declared (see Article II.19.4 of the Agreement) accounted according to the
Beneficiary's usual accounting
practice. N.A
E USE OF EXCHANGE RATES
E.1 a) For Beneficiaries with accounts established in a currency other than euros
84) The exchange rates used to
The Auditor sampled ______ cost items selected randomly and verified that the exchange convert other currencies into
rates used for converting other currencies into euros were in accordance with the following Euros were in accordance with
rules established in the Agreement (full coverage is required if there are fewer than 5 items,
the rules established in the
otherwise the sample should have a minimum of 5 item, or 10% of the total, whichever number is
the highest): Grant Agreement and there was
no difference in the final
N.A
Costs incurred in another currency shall be converted into euro at the average of the daily figures.
exchange rates published in the C series of Official Journal of the European Union
(http://www.ecb.europa.eu/stats/exchange/eurofxref/html/index.en.html ), determined over the
corresponding reporting period.
If no daily euro exchange rate is published in the Official Journal of the European Union for the
currency in question, conversion shall be made at the average of the monthly accounting rates
established by the Commission and published on its website
30
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
(http://ec.europa.eu/budget/contracts_grants/info_contracts/inforeuro/inforeuro_en.cfm ),
determined over the corresponding reporting period.
A guide to currency conversion to euro is available from the CINEA website:
https://ec.europa.eu/inea/sites/inea/files/practical_help_to_the_implementation_of_article_ii_23_4_final.pdf
b) For Beneficiaries with accounts established in euros
85) The Beneficiary applied its
The Auditor sampled ______ cost items selected randomly and verified that the exchange usual accounting practices.
rates used for converting other currencies into euros were in accordance with the following
rules established in the Agreement ( full coverage is required if there are fewer than 5 items,
otherwise the sample should have a minimum of 5 item, or 10% of the total, whichever number is N.A
the highest):
Costs incurred in another currency shall be converted into euro by applying the Beneficiary’s usual
accounting practices.
F COMPLIANCE WITH ELIGIBILITY PERIOD
F1 a) Regardless of their nature, the Auditor samples the 10 earliest dated and 10 latest dated
86) The costs declared were
transactions in the financial statement). If cost items falling into this category have already been
sampled under previous checked, and eligibility verified, the test does not have to be repeated. incurred within the reporting
period and free from non- C
The Auditor inspected the sample and verified that:
eligible costs set out in Article
o the declared costs were incurred during the reporting period covered by the cost declaration; II.19.4 of the Agreement.
o the declared costs were accounted in line with the beneficiary's usual accounting practice;
87) The declared costs were
o 'The Auditor verified that no ineligible costs such as deductible VAT, exchange rate losses,
accounted according to the
excessive or reckless expenditure were declared (see Article II.19.4 of the Agreement)
Beneficiary's usual accounting C
practice.
'cost were incurred' is when the generating event that triggers the costs takes place. It must be
during the action duration.
31
Agreement number: INEA/CEF/TRAN/M2018/1767529
Action number: 2018-EE-TM-0029-M
CEF general model grant agreement: update April 2017
Annex VII: November 2017
If costs are invoiced or paid later than the action completion date (Article 2.2), they are eligible
only if the debt existed already during the action duration (supported by documentary evidence)
and the final cost was known at the moment of the financial report.
Costs of services or equipment supplied to a beneficiary may be invoiced and paid after the end
date of the action if the services or equipment were delivered to the beneficiary during the action
duration. By contrast, costs of services or equipment supplied after the end of the action (or after
GA termination) are not eligible.
32
Terms of Reference for an Independent Report of Factual Findings on costs declared under a Grant Agreement financed under the Connecting Europe Facility ( CEF) This document sets out the ‘ Terms of Reference ( ToR ) ’ under which Estonian Transport Administration (‘the Beneficiary’) agrees to engage Grant Thornton Baltic OÜ (‘the Auditor’) to produce an independent report of factual findings (‘the Report’) concerning the Financial Statement(s) drawn up by the Estonian Transport Administration for the CEF grant agreement INEA/CEF/TRAN/M2018/1767529, "Dynamic traffic and truck parking management" ("the action"), action number 2018-EE-TM-0029-M and duration 01/06/2019 (“the starting date”) until 31/12/202 4 (“the completion date) (‘the Agreement’), and to issue a Certificate on the Financial Statements’ (‘CFS’) referred to in Article II.23.2 of the Agreement based on the compulsory reporting template stipulated by the Commission . The Agreement has been concluded under the Connecting Europe Facility (CEF ) Transport sector between the B eneficiary and the European Climate, Infrastructure and Environment Executive Agency ( C INEA ) (‘the Agency’), under the powers delegated by the European Commission (‘the Commission’ ). The Agency is mentioned as a signatory of the Agreement with the Beneficiary only. The Agency is not a party to this engagement. 1.1 Subject of the engagement The coordinator must submit to the Agency the 8 months following the end of the reporting perio d following the end of the last reporting period which should include, amongst other documents, a CFS for each beneficiary, each Affiliated Entity and Implementing Body, for which a total contribution of EUR 325 000 or more is requested, as reimbursement of actual eligible costs and unit costs calculated on the basis of its usual cost accounting practices (see Article II.23.2 of the Agreement). The CFS must cover all reporting periods of the beneficiary, Affiliated Entity or Implementing Body indicated above. The Beneficiary must submit to the coordinator the CFS covering the total declared costs for itself, its Affiliated Entity( ies ) and its Implementing Body( ies ), if the CFS must be included in the request for interim payment according to Article II.23.2 of the Agreement . The CFS is composed of two separate documents: The Terms of Reference (‘the ToR ’) to be signed by the Beneficiary and the Auditor; The Auditor’s Independent Report of Factual Findings (‘the Report’) to be issued on the Auditor’s letterhead, dated, stamped and signed by the Auditor (or the competent public officer) which includes the agreed-upon procedures (‘the Procedures’) to be performed by the Auditor, and the standard factual findings (‘the Findings’) to be confirmed by the Auditor. If the CFS must be included in the interim report according to Article II.23.2 of the Agreement, the request for interim payment rel ating to the Agreement cannot be made without the CFS. However, the payment for reimbursement of costs covered by the CFS does not preclude the Commission, the Agency , the European Anti-Fraud Office and the European Court of Auditors from carrying out checks, reviews, audits and investigations in accordance with Article II.27 of the Agreement. 1.2 Responsibilities The Beneficiary: must draw up the Financial Statement(s) for the action financed by the Agreement in compliance with the obligations under the Agreement. The Financial Statement(s) must be drawn up according to the Beneficiary’s accounting and book-keeping system and the underlying accounts and records; must send the Financial Statement(s) to the Auditor; is responsible and liable for the accuracy of the Financial Statement(s ); is responsible for the completeness and accuracy of the information provided to enable the Auditor to carry out the Procedures. It must provide the Auditor with a written representation letter supporting these statements. The written representation letter must state the period covered by the statements and must be dated; accepts that the Auditor cannot carry out the Procedures unless it is given full access to the Beneficiary’s staff and accounting as well as any other relevant records and documentation. The Auditor: is qualified to carry out statutory audits of accounting documents in accordance with Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of annual accounts and consolidated accounts, amending Council Directives 78/660/EEC and 83/349/EEC and repealing Council Directive 84/253/EEC or similar national regulations. The Auditor: must be independent from the Beneficiary, in particular, it must not have been involved in preparing the Beneficiary’s Financial Statement(s ) or providing consultancy advice on the related operations and underlying transactions; must plan work so that the Procedures may be carried out and the Findings may be assessed; must adhere to the Procedures laid down and the compulsory report format; must carry out the engagement in accordance with this ToR ; must document matters which are important to support the Report; must base its Report on the evidence gathered; must submit the Report to the Beneficiary . The Agency sets out the Procedures to be carried out by the Auditor. The Auditor is not responsible for their suitability or pertinence. As this engagement is not an assurance engagement, the Auditor does not provide an audit opinion or a statement of assurance. 1.3 Applicable Standards The Auditor must comply with these Terms of Reference and with : the International Standard on Related Services (‘ISRS’) 4400 Engagements to perform Agreed-upon Procedures regarding Financial Information as issued by the International Auditing and Assurance Standards Board (IAASB ); the Code of Ethics for Professional Accountants issued by the International Ethics Standards Board for Accountants (IESBA). Although ISRS 4400 states that independence is not a requirement for engagements to carry out agreed-upon procedures, the Agency requires that the Auditor also complies with the Code’s independence requirements. The Auditor’s Report must state that there is no conflict of interests in establishing this Report between the Auditor and the Beneficiary, and must specify - if the service is invoiced - the total fee paid to the Auditor for providing the Report. 1.4 Reporting The Report must be written in English in accordance with Article 4.3 of the Agreement. Under Article II.27 of the Agreement, the Commission, the Agency, the European Anti-Fraud Office and the Court of Auditors have the right to audit any work that is carried out under the action and for which costs are declared from the European Union budget. This includes work related to this engagement. The Auditor must provide access to all working papers (e.g. recalculation of hourly rates, verification of the time declared for the action) related to this assignment if the Commission, the Agency, the European Anti-Fraud Office or the European Court of Auditors requests them. 1.5 Timing The Report must be provided by 12 O ctober 202 5 . 1.6 Other terms The Beneficiary and the Auditor have signed a contract number 1.3-3/25/12479-2 to agree other specific terms, such as the Auditor’s fees, liability, applicable law, etc. Grant Thornton Baltic OÜ Estonian Transport Administration Represented by Mart Nõmper Partner Represented by Priit Sauk Director General 12 September 202 5 12 September 202 5 Signature of the Auditor /Digitally signed/ Signature of the Beneficiary /Digitally signed/
European
Commission
Innovation and Final report
Networks Executive
Agency (INEA)
Connecting Europe
Facility
1. INFORMATION ON THE ACTION
Grant Agreement
INEA/CEF/TRAN/M2018/1767529
Nº
Action title
"Dynamic traffic and truck parking management"
PCI (if
N/A
applicable)
Author of the report
Name Mr. Janar Künamägi
Position Intelligent Transport Systems Project Manager
Entity Estonian Transport Administration
Telephone Nº +372 585 15 235
E-mail
[email protected]
1
2. IMPLEMENTATION OF THE ACTION
2.1. Overall completion of the Action
Planned Start/End Actual Start/End date Completion2
date1
01/06/2019 31/12/2024 01/06/2019 31/12/2024 100%
2.2. Completion per activity
Title1 Planned Start/End Actual Start/End Complet
date1 date ion
Activity 1
Project management 01/06/2019 31/12/ 01/06/201 31/12/ 100%
2024 9 2024
Milestone Title1 Planned date1 Actual date Reache
no d (Y/N)
1 PM and SG joint meeting 31/12/2019 20/11/2019 Y
No. 1
2 PM and SG joint meeting 30/06/2020 07/05/2020 Y
No. 2
3 PM and SG joint meeting 31/12/2020 17/09/2020 Y
No. 3
1
As specified in the Grant Agreement.
2 The completion of the action and of each activity should be indicated as a percentage.
2
4 PM and SG joint meeting 30/06/2021 02/09/2021 Y
No. 4
5 PM and SG joint meeting 31/12/2021 18/11/2021 Y
No. 5
6 PM and SG joint meeting 30/06/2022 19/05/2022 Y
No. 6
7 PM and SG joint meeting 31/12/2022 13/09/2022 Y
No. 7
8 PM and SG joint meeting 30/06/2023 15/06/2023 Y
No. 8
9 PM and SG joint meeting 31/12/2023 19/12/2023 Y
No. 9
10 PM and SG joint meeting 30/06/2024 14/08/2024 Y
No. 10
Title1 Planned Start/End Actual Start/End Completi
date1 date on
Activity 2
Communication and 01/06/2019 31/12/ 01/06/201 19/09/ 100%
2024 9 2024
dissemination
Milestone Title1 Planned date1 Actual date Reached
no (Y/N)
11 Project opening press / kick 31/12/2019 20/11/2019 Y
off meeting event
12 Project communication plan 31/10/2019 14/10/2019 Y
13 Communication support 31/05/2020 20/04/2020 Y
materials
14 Project finalization press / 31/10/2024 19/09/2024 Y
final meeting event
3
Title1 Planned Start/End Actual Start/End Completi
date1 date on
Activity 3
Transport and ITS study for 01/09/2019 30/09/ 01/09/201 09/09/ 100%
preparation of pilot 1 and 2 2020 9 2020
Milestone Title1 Planned date1 Actual date Reached
no (Y/N)
15 Publication of Tender 31/12/2019 02/12/2019 Y
Transport and ITS study
report
16 Assessment of offers 31/01/2020 10/01/2020 Y
Transport and ITS study
report
17 Contract signed Transport 01/02/2020 23/01/2020 Y
and ITS study report
18 Transport and ITS study 30/06/2020 04/06/2020 Y
interim report
19 Transport and ITS study 30/09/2020 09/09/2020 Y
final report
Title1 Planned Start/End Actual Start/End Completi
date1 date on
Activity 4
Pilot implementation 1: 01/09/2020 31/12/ 22/10/202 01/12/ 100%
dynamic traffic 2023 0 2023
management system in
E265 section km 10-20
Milestone Title1 Planned date1 Actual date Reached
no (Y/N)
20 Publication of tender Pilot 01/10/2020 22/10/2020 Y
4
1
21 Assessment of offers Pilot 1 31/12/2020 04/12/2020 Y
22 Contract signed Pilot 1 31/01/2021 03/01/2021 Y
23 Pilot 1 implemented solution 31/12/2023 01/12/2023 Y
is in operation
Title1 Planned Start/End Actual Start/End Completi
date1 date on
Activity 5
Pilot implementation 2: 01/09/2020 01/06/ 06/05/202 18/10/ 100%
smart (safe and secure) 2024 0 2024
truck parking area in E265
km 1,5
Milestone Title1 Planned date1 Actual date Reached
no (Y/N)
24 Publication of tender Pilot 2 01/10/2020 17/08/2020 Y
25 Delivery of the scoping 31/12/2020 06/05/2020 Y
decision and subsequent
environmental permits
26 Assessment of offers Pilot 2 31/12/2020 22/09/2020 Y
27 Contract signed Pilot 2 31/01/2021 13/10/2020 Y
28 Pilot 2 implemented solution 01/06/2024 18/10/2024 Y
is in operation
5
Title1 Planned Start/End Actual Start/End Completi
date1 date on
Activity 6
Implementation of dynamic 01/05/2021 01/09/ 01/11/202 19/03/ 100%
traffic management system 2024 1 2024
E265 in sections km 0-10
and km 20-30
Milestone Title1 Planned date1 Actual date Reached
no (Y/N)
29 Publication of tender E265 01/11/2021 21/06/2021 Y
km 0-10 and km 20-30
30 Assessment of offers E265 01/02/2022 02/09/2021 Y
km 0-10 and km 20-30
31 Contract signed for E265 30/04/2022 12/10/2021 Y
km 0-10 and km 20-30
32 E265 section solution km 0- 01/09/2024 19/03/2024 Y
10 and km 20-30 is in
operation
6
2.3. Description of the implementation of the Action, including the actual status at the end of
the Action and possible deviations from the planned activities, and, if applicable, compliance
with any relevant specific provisions as indicated in the Annex I of the GA
• 2019
• Activities started: Activities 1-3.
• Milestones completed:
○ PM and SG joint meeting No. 1
○ Project communication plan
○ Publication of Tender Transport and ITS study report
○ Project opening press/kick-off meeting event
• Delays and reasons: PM & SG meetings delayed due to late hiring of the project manager
(September 2019), which also caused a minor delay in the ITS Tender publication.
• Deviations or unforeseen tasks: None.
• 2020
• Activities ongoing/started/completed: Activities 1-2 ongoing; Activities 4-5 started; Activity 3
completed.
• Milestones completed:
○ PM and SG joint meeting No. 2
○ PM and SG joint meeting No. 3
○ Communication support materials
○ Assessment of offers Transport and ITS study report
○ Contract signed Transport and ITS study report
○ Transport and ITS study interim report
○ Transport and ITS study final report
○ Publication of tender Pilot 1
○ Assessment of offers Pilot 1
○ Publication of tender Pilot 2
○ Delivery of the scoping decision and subsequent environmental permits
○ Assessment of offers Pilot 2
○ Contract signed Pilot 2
• Delays and reasons: PM & SG meetings postponed due to cascading delay from 2019. No impact
on Action’s end date. Some milestones completed earlier than planned (e.g. environmental permits).
• Deviations or unforeseen tasks: Beneficiary decided to split Pilot 1 & 2 tenders into two stages
7
(design and building) for greater precision and cost transparency.
• 2021
• Activities ongoing/started/completed: Activities 1, 2, 4, 5 ongoing; Activity 6 started.
• Milestones completed:
○ PM and SG joint meeting No. 4
○ PM and SG joint meeting No. 5
○ Contract signed Pilot 1
○ Publication of tender E265 km 0-10 and km 20-30
○ Assessment of offers E265 km 0-10 and km 20-30
○ Contract signed for E265 km 0-10 and km 20-30
• Delays and reasons: Division of Pilots 1 & 2 into two stages shifted building contracts.
• Deviations or unforeseen tasks: none.
• 2022
• Activities ongoing/started/completed: Activities 1, 2, 4, 5, 6 ongoing.
• Milestones completed: PM & SG meetings (No. 6, No. 7) and partial implementation of Pilot 2.
○ PM and SG joint meeting No. 6
○ PM and SG joint meeting No. 7
• Delays and reasons: Pilot 1 delayed due to contract renegotiation after Ukraine war increased
material prices; Pilot 2 delayed due to operator and equipment installation. PM & SG meetings also
postponed.
• Deviations or unforeseen tasks: Need to contract a private partner to establish parking entry
system for Pilot 2 to meet Bronze-level requirements. Parking access system and operational costs are
outside the Action’s scope.
• 2023
• Activities ongoing/started/completed: Activities 1, 2, 5, 6 ongoing; Activity 4 completed.
• Milestones completed:
○ PM and SG joint meeting No. 8
○ PM and SG joint meeting No. 9
○ Pilot 1 implemented solution is in operation
• Delays and reasons: Pilot 2 acceptance signed in January 2023; parking opened in July 2023 with
8
partial services due to cost increases of entry-system.
• Deviations or unforeseen tasks: The project was initially scheduled for completion in December
2023. However, due to supply chain disruptions caused by the full-scale war in Ukraine, the timeline was
extended to December 2024. To accommodate this change, Beneficiary submitted a request for a one-
year time extension in July 2023, which was approved by Agency with updating remaining milestones.
• 2024
• Activities ongoing/started/completed: Activities 1, 2, 5, 6 completed.
• Milestones completed:
○ PM and SG meeting No. 10
○ Project finalization press / final meeting event
○ Pilot 2 implemented solution is in operation
○ E265 section solution km 0-10 and km 20-30 is in operation
• Delays and reason: Beneficiary opened truck parking area with Bronze-level services in July 2024,
but due to minor outstanding works, Estonian Transport Administration signed final acceptance act with
parking entry system contractor on 18th October 2024. These costs were considered outside the Action's
scope.
• Deviations or unforeseen tasks: None. Project was fully completed as of December 2024.
9
2.4. Conclusions on results of the Action, including the impact of the possible deviation on 1)
the objectives of the action, 2) the completion of the planned activities and 3) the cost-
breakdown
Overall Results
The Action has progressed in line with its objectives. Key studies, pilot implementations, and the dynamic
traffic management system have been launched and brought into operation. Despite some delays in
meetings and implementation phases, the Action remained on track, with major milestones completed
within the Grant Agreement timeframe.
Project budget overview
Year Planned in GA (€) Actual expenses (€)
2019 118,700 12,040.62
2020 180,150 128,586.48
2021 43,250 159,850.44
2022 2,531,050 3,878,759.39
2023 1,144,000 901,518.59
2024 982,850 810,830.35
Total 5,000,000 5,891,585.87
Impact of Deviations
1. On the Objectives of the Action
• All six activities have contributed to the objectives as originally foreseen.
• Delays in PM & SG meetings did not compromise decision-making or coordination, only shifting
timelines.
• The split of Pilots 1 and 2 into design and building stages improved precision, cost control, and
quality of outputs without changing objectives.
• External factors (Ukraine war, cost increases for materials) caused minor postponements, but
the scope and objectives of the Action were fully achieved.
2. On the Completion of Planned Activities
• Studies (Activity 3): Completed successfully in 2020, providing the foundation for subsequent
pilots.
• Pilots 1 and 2: Divided into two stages; design and construction completed, with acceptance
documentation signed. Pilot 1 is in operation since Dec 2023, and Pilot 2 was partially operational
in 2023 and was fully functional in summer of 2024.
• Activity 6: Acceptance document signed in March 2024 and is in operation.
• Project Management & Communication (Activities 1 & 2): Overall, all activities are either
complete or in finalization, with delays absorbed within the project timeline.
10
3. On the Cost Breakdown
• The division of Pilots 1 and 2 into design and building phases improved financial clarity and
enabled more precise budgeting.
• Rising material costs (due to external geopolitical events) increased pressure on budgets;
however, adjustments were made through contract amendments without jeopardizing Action
completion.
• The cost of constructing the truck parking area (Activity 5) ended up being twice as high as
originally estimated at the time of signing the Grant Agreement. However, since all other
activities were completed at lower costs than planned, the overall increase in project expenditure
was limited to just 18% above the original budget.
• The Estonian Transport Administration covered the additional costs using its own budget
resources.
• The additional cost for operating Pilot 2 (operating services) is outside the Action’s budget,
ensuring compliance with cost eligibility rules.
• No significant cost overruns directly threaten the Action’s delivery.
4. Budget execution by Activities
Activity 1 – Project Management
Year Planned in GA (€) Actual expenses (€)
2019 11,000 10,124.06
2020 30,000 28,098.48
2021 18,000 17,527.44
2022 27,000 25,191,48
2023 40,000 48,557.28
2024 94,000 42,949.80
Total 220,000 172,448.54
Activity 2 - Communication and dissemination
Year Planned in GA (€) Actual expenses (€)
2019 1,700 1,916.56
2020 150 0
2021 150 0
2022 150 150
2023 5,000 1,191
2024 22,850 7,531
Total 30,000 10,788.56
Activity 3: Transport and ITS study for preparation of pilot 1 and 2
Year Planned in GA (€) Actual expenses (€)
2019 106,000 0
2020 144,000 100,488.00
2021 0 117,573.00
2022 0 0
2023 0 0
2024 0 0
Total 250,000 218,061.00
11
Activtiy 4: Pilot implementation 1: dynamic traffic management system in E265 section km
10-20
Year Planned in GA (€) Actual expenses (€)
2019 0 0
2020 1,000 0
2021 5,100 5,100
2022 535,900 476,926.94
2023 458,000 352,507.08
2024 0 37,022.04
Total 1,000,000 871,556.06
Activity 5: Pilot implementation 2: smart (safe and secure) truck parking area in E265 km 1,5
Year Planned in GA (€) Actual expenses (€)
2019 0 0
2020 5000 0
2021 5,000 4,610
2022 1,488,000 2,999,308.32
2023 1,000 0
2024 1,000 0
Total 1,500,000 3,003,918.32
Activity 6: Implementation of dynamic traffic management system E265 in sections km 0-10
and km 20-30
Year Planned in GA (€) Actual expenses (€)
2019 0 0
2020 0 0
2021 15,000 15,040
2022 480,000 377,182.65
2023 640,000 499,263.23
2024 865,000 723,327.51
Total 2,000,000 1,614,813.39
Conclusion
The Action’s deviations (delays, splitting of tenders, additional operator requirements) have been
manageable and strategic rather than disruptive. They improved quality and cost control, while external
challenges were mitigated without undermining objectives. The Action remained on track to achieve all
planned results within the Grant Agreement timeframe and budget structure.
12
3. VISIBILITY OF UNION FUNDING
What measures have been taken to publicize the Action, including EU funding (GA II.7.1)?
1) According to the communication plan the project was introduced to public at the kick-off meeting
and with press release in November 2019. Before that the map and logo as visual aid were designed
which are currently with CEF logo published on ETA website. In addition, the project was published
also in social media. Both animated video, project video, final event recording and Transport and
ITS study can be found on ERA's project's page
Est:
https://www.transpordiamet.ee/tallinna-ringtee-e265-its-projekt
https://www.youtube.com/watch?v=OhrOxyenOeo
Eng:
https://www.transpordiamet.ee/en/roads-waterways-airspace/projects/tallinn-ring-road-e265-its-
project
https://www.youtube.com/watch?v=RbxZtE1tn28&t=1s
2) We installed three project information boards: two at both ends of the E265 project section and one
in the safe and secure truck parking area.
3) In every press release and social media post about the project, we indicated the co-funding from the
EU:
Press release about Activities 4 and 6:
• https://transpordiamet.ee/uudised/transpordiamet-toob-nutikad-liikluslahendused-tallinna-
ringteele
Postimees: https://www.postimees.ee/7370732/tallinna-ringteel-muutub-liiklus-2-7-miljoni-euro-
eest-nutikaks,
Pealinn: https://pealinn.ee/2021/10/26/transpordiamet-toob-tallinna-ringteele-nutikad-
liikluslahendused/.
• https://transpordiamet.ee/uudised/tallinna-ringteel-juri-luige-loigul-hakkasid-toole-muutuva-
teabega-liiklusmargid
Logistikauudised: https://www.logistikauudised.ee/uudised/2024/03/01/tallinna-ringteel-juriluige-
loigul-hakkasid-toole-muutuva-teabega-liiklusmargid
Autogeenius: https://auto.geenius.ee/rubriik/uudis/tallinna-ringteel-pandi-viimaks-toole-muutuva-
tebaega-liiklusmargid/
• https://transpordiamet.ee/uudised/tallinna-ringteel-vao-juri-ja-luige-kanama-loikudel-
kaivitati-muutuva-teabega-liiklusmargid
Autogeenius: https://auto.geenius.ee/rubriik/hea-nipp/tallinna-ringteel-kaivitati-uued-muutuva-
teabega-liiklusmargid/
13
Logistikauudised: https://www.logistikauudised.ee/uudised/2024/06/04/tallinna-ringtee-on-kaetud-
muutuva-teabega-liiklusmarkidega
• https://transpordiamet.ee/uudised/tallinna-ringtee-e265-its-projekt-valmib-tervikuna-2024-
aasta-lopuks
Logistikauudised: https://www.logistikauudised.ee/uudised/2024/09/19/tallinna-ringtee-projekt-
valmib-tervikuna-aasta-lopuks
Autonet: https://auto.pub/tallinna-ringtee-muutteabega-liiklusmarkide-projekt-valmib-kaesoleva-
aasta-lopuks/
Social media posts about activities 4 and 6:
https://www.facebook.com/EestiTranspordiamet/posts/pfbid0YDV16FtRtPE4kzr9CbCS5xUDxxQJ19a
7orEykBQa4HFesy1acTgcTd5XAobysoZCl
https://www.facebook.com/EestiTranspordiamet/posts/pfbid023u3ydGgJhAcY4kXkhdPJSwfjg48K4D
ayfoY1RhqpL2ZyHknnt9XGuqzuLEjSuFNcl
https://www.facebook.com/EestiTranspordiamet/posts/pfbid02B6nErUYFhu6DJEwMgA9H36KftZojjD
nuviqTNtRmbgF66c7ku4yK67diDvHWW6dkl
https://www.linkedin.com/posts/transpordiamet_eelmisel-n%C3%A4dalal-paigaldati-tallinna-
activity-7119582237297172480-8DEC?utm_source=share&utm_medium=member_desktop
https://www.linkedin.com/posts/transpordiamet_eelmisel-n%C3%A4dalal-k%C3%BClastasid-
intelligentsete-activity-7056500980305022976-
kufP?utm_source=share&utm_medium=member_desktop
https://www.linkedin.com/posts/transpordiamet_tallinna-ringteel-v%C3%A4oj%C3%BCri-ja-
luigekanama-activity-7203671527127437314-t9tl
https://www.facebook.com/EestiTranspordiamet/posts/pfbid0Yg157fSKU7t45RA3Y8RDcHSJPprwAM
46Zwzd79YLjJ6ZXtqZAe79u8kFbwTTFaa1l
Press release about Activity 5:
• https://transpordiamet.ee/uudised/tallinna-ringtee-aarde-rajatakse-104-kohaline-
veoautode-parkla
Autonet: https://auto.pub/rekajuhid-saavad-104-kohalise-parkla-vao-liiklussolme-juurde/,
Auto24: https://www.auto24.ee/uudised/uudised.php?uid=64807,
Postimees: https://station.ee/#42032604
Ehitusuudised: https://www.ehitusuudised.ee/uudised/2021/11/26/tallinna-ringtee-aarde-
rajatakse-104kohaline-veoautode-parkla,
Logistikauudised: https://www.logistikauudised.ee/uudised/2021/11/26/tallinna-ringtee-aarde-
rajatakse-104kohaline-veoautode-parkla
• https://transpordiamet.ee/uudised/veoautode-jaoks-loodud-venekula-parkla-avatud
Logitikauudised: https://www.logistikauudised.ee/uudised/2023/07/11/venekula-veoautode-parkla-
on-avatud
14
Autogeenius: https://auto.geenius.ee/rubriik/uudis/veoautode-jaoks-loodud-venekula-parkla-on-
avatud/
• https://www.transpordiamet.ee/uudised/venekula-veoautode-parklas-nuudsest-kasutusel-
labipaasususteem
Ehitusuudised: https://www.ehitusuudised.ee/uudised/2024/07/10/tref-nord-ehitas-venekulla-
labipaasususteemiga-veoautode-parkla
Autogeenius: https://auto.geenius.ee/rubriik/uudis/kord-tallinna-ringtee-tasuta-parklas-laks-
karmimaks-sisse-paasevad-vaid-veokid/
Logistikauudised: https://www.logistikauudised.ee/uudised/2024/07/10/venekula-veoautode-
parkla-on-nuud-labipaasususteemiga
Social media posts about activity 5:
https://www.facebook.com/share/p/e9xEYX4n73o13HcD/
https://www.facebook.com/EestiTranspordiamet/posts/892276532937760/
https://www.linkedin.com/posts/transpordiamet_venek%C3%BCla-veoautode-parklas-on-
n%C3%BC%C3%BCdsest-kasutusel-activity-7217053924237725696-JOFd
15
4. OTHER SOURCES OF EUROPEAN UNION FUNDS
If applicable, provide information about other sources of EU funds (CEF, ERDF, Cohesion
Fund, H2020, TEN, EEPR, EIPA, etc.) used for the project of common interest / global
project (e.g. previous or subsequent phases not covered by the Grant Agreement).
N/A
16
5. COMPLIANCE WITH EU LEGISLATION
5.1. Environmental information: overview of environmental aspects, compliance with EU
and national legislation, possible issues during the implementation of the Action and
measures taken.
According to the Grant Agreement the implementation of the Activity 5 is subject to the acquisition of
the necessary environmental permission, which had to be requested and obtained in advance by the
beneficiary.
The environmental permission was declared and signed by Environmental Board on 06/05/2020.
5.2. Where relevant, information on the compliance with EU legislation regarding other
matters (notably public procurement, competition, regulatory matters, etc…).
1) Trafiction OÜ - Design of ITS equipment installation at km 0-30 of Tallinn Ring Road No. 11.
a) Internal reference: 1-9/20/2864-1
b) Date of signature of the contract: 03.01.2021
c) Procurement Procedure at European or National level?: European
d) Procedure: Open
e) Reference of publication(s) in the Official Journal (contract notice): 2020/S 207-504170 of
23.10.2020
f) Reference of publication(s) in the Official Journal (contract award notice): 2021/S 006-009846
of 11.01.2021
g) National law applied transposes Directive 2004 or 2014?: 2014/24/EU
h) National Procurement Register link:
https://riigihanked.riik.ee/rhr-web/#/procurement/2475992/general-info
2) Roadplan OÜ - Construction project for a truck parking lot at km 1.5 of the Tallinn Ring Road,
State Road No. 11
a) Internal reference: 1-9/20/2260-1
17
b) Date of signature of the contract: 14.10.2020
c) Procurement Procedure at European or National level?: European
d) Procedure: Open
e) Reference of publication(s) in the Official Journal (contract notice): 2020/S 160-390183 of
19.08.2020
f) Reference of publication(s) in the Official Journal (contract award notice): 2020/S 217-532457
of 06.11.2020
g) National law applied transposes Directive 2004 or 2014?: 2014/24/EU
h) National Procurement Register link:
https://riigihanked.riik.ee/rhr-web/#/procurement/2218272/general-info
3) Kiirwarren.KL OÜ - Purchase and installation of ITS equipment on State Road No. 11, Tallinn Ring
Road, km 0-30
a) Internal references: 3.2-6/21/2799-1, 3.2-6/21/2800-1
b) Date of signature of the contract: 12/10/2021
c) Procurement Procedure at European or National level?: European
d) Procedure: Open
e) Reference of publication(s) in the Official Journal (contract notice): 2021/S 119-312820 of
22.06.2021
f) Reference of publication(s) in the Official Journal (contract award notice): 2021/S 204-532850
of 20.10.2021
g) National law applied transposes Directive 2004 or 2014?: 2014/24/EU
h) National Procurement Register link:
https://riigihanked.riik.ee/rhr-web/#/procurement/3317816/general-info
4) AS TREF Nord - Construction of a truck parking lot at km 1.5 of Tallinn Ring Road, State Road No.
11
a) Internal reference: 3.2-3/21/2998-1
b) Date of signature of the contract: 15/11/2021
c) Procurement Procedure at European or National level?: National
d) Procedure: Open
e) Reference of publication(s) in the Official Journal (contract notice): Cost was below the EU
threshold.
f) Reference of publication(s) in the Official Journal (contract award notice): Cost was below the
EU threshold.
g) National law applied transposes Directive 2004 or 2014?: 2014/24/EU
h) National Procurement Register link:
https://riigihanked.riik.ee/rhr-web/#/procurement/3580916/general-info
18
5.3. For CEF-Energy only and if applicable: please provide information on any possible
update of the CBCA decision relating to the project
N/A
19
6. EXECUTIVE SUMMARY
For CEF-Energy only, please provide an executive summary for publication and
transmission to interested parties on the results of the activities carried out during the
implementation period in relation to the execution of the Action. It should contain
• a brief description of the Action and of the related activities,
• the duration of the Action and of the related activities and
• the main outcomes of the Action and of the related activities.
N/A
ANNEX: Financial statement
20
Saatja: Janar Künamägi </O=MAJANDUS-TEEDE-SIDEMINISTEERIUM/OU=EXCHANGE ADMINISTRATIVE GROUP (FYDIBOHF23SPDLT)/CN=RECIPIENTS/CN=USERB8C577D8>
Saaja: '
[email protected]', 'DIEZ Jose Maria'
Teema: Final report and financial documents 2023-2024 - Action n°– 2018-EE-TM-0029-M - "Dynamic traffic and truck parking management" - Grant Agreement number INEA/CEF/TRAN/M2018/1767529
Dear Mr. Christian Faure,
On behalf of Mr. Priit Sauk, please find enclosed the digitally signed individual and consolidated financial statements for the period 2023–2024 (in both Excel and PDF formats), the audit report prepared by Grant Thornton Baltic OÜ, and the project’s final report.
Best regards,
Janar Künamägi
Intelligent Transport Systems Project Manager
Traffic Management Centre
+372 5851 5235
www.transpordiamet.ee <http://www.transpordiamet.ee/>