dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Sotsiaalministeerium
Muu lepingAvalik

Leping

Sotsiaalministeerium · 18. märts 2021
Viit
2-2.1/1372-1
Registreeritud
18. märts 2021
Dokumendi liik
Muu leping
Funktsioon
2 Välisabi ja struktuuritoetuste rakendamine
Sari
2-2.1 Välisabi vahenditest rahastatavate projektide lepingud koos aktidega
Toimik
2-2.1
Vastutaja
Kaily Susi (Sotsiaalministeerium, Kantsleri vastutusvaldkond, Terviseala asekantsleri vastutusvaldkond, Tervisesüsteemi arendamise osakond)

Failid

  • 📎Grant Agreement-101018346-TaSHI (3).pdf4062 KB

Sisu (failidest)

Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 EUROPEAN COMMISSION Consumers, Health, Agriculture and Food Executive Agency (CHAFEA) The Director GRANT AGREEMENT NUMBER 101018346 — TaSHI This Agreement (‘the Agreement’) is between the following parties: on the one part, the Consumers, Health, Agriculture and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European Commission ('the Commission'), represented for the purposes of signature of this Agreement by Véronique WASBAUER, Director, or his/her duly authorised representative, and on the other part, 1. ‘the coordinator’: SEMMELWEIS EGYETEM (SU), established in ULLOI UTCA 26, BUDAPEST 1085, Hungary, VAT number: HU15329808, represented for the purposes of signing the Agreement by rector of SU, Béla Dr. Merkely and the following other beneficiaries, if they sign their ‘Accession Form’ (see Annex 3 and Article 40): 2. AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI (AGE.NA.S), established in VIA PUGLIE 23, ROMA 00187, Italy, 3. STICHTING NEDERLANDS INSTITUUT VOOR ONDERZOEK VAN DE GEZONDHEIDSZORG (NIVEL), established in OTTERSTRAAT 118-124, UTRECHT 3500 BN, Netherlands, VAT number: NL007077191B01, 4. LIETUVOS RESPUBLIKOS SVEIKATOS APSAUGOS MINISTERIJA (MOH-LT), established in VILNIAUS G 33, VILNIUS LT 01506, Lithuania, 5. SOTSIAALMINISTEERIUM (SM-EE), established in Suur-Ameerika 1, TALLINN 10122, Estonia, 6. UNIVERSITETET I SOROST-NORGE (USN), established in KJOLNES RING 56, PORSGRUNN 3918, Norway, VAT number: NO911770709MVA, 1 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 7. ISTITUTO REGIONALE PER IL SUPPORTOALLAE POLITICHE DELLA LOMBARDIA (POLIS-LOMBARDIA) (PoliS-Lombardia), established in VIA TORQUATO TARAMELLI 12/F, MILANO 20124, Italy, VAT number: IT07221390961, Unless otherwise specified, references to ‘beneficiary’ or ‘beneficiaries’ include the coordinator. The parties referred to above have agreed to enter into the Agreement under the terms and conditions below. By signing the Agreement or the Accession Form, the beneficiaries accept the grant and agree to implement it under their own responsibility and in accordance with the Agreement, with all the obligations and conditions it sets out. The Agreement is composed of: Terms and Conditions Annex 1 Description of the action Annex 2 Estimated budget for the action Annex 2a Not applicable Annex 3 Accession Forms Annex 4 Model for the financial statements Annex 5 Model for the certificate on the financial statements (CFS) 2 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 TERMS AND CONDITIONS TABLE OF CONTENTS CHAPTER 1 GENERAL................................................................................................................................................8 ARTICLE 1 — SUBJECT OF THE AGREEMENT.........................................................................................8 CHAPTER 2 ACTION................................................................................................................................................... 8 ARTICLE 2 — ACTION TO BE IMPLEMENTED.........................................................................................8 ARTICLE 3 — DURATION AND STARTING DATE OF THE ACTION......................................................8 ARTICLE 4 — ESTIMATED BUDGET AND BUDGET TRANSFERS........................................................ 8 4.1 Estimated budget.................................................................................................................................. 8 4.2 Budget transfers....................................................................................................................................8 CHAPTER 3 GRANT.....................................................................................................................................................8 ARTICLE 5 — GRANT AMOUNT, FORM OF GRANT, REIMBURSEMENT RATE AND FORMS OF COSTS..............................................................................................................................................8 5.1 Maximum grant amount....................................................................................................................... 8 5.2 Form of grant, reimbursement rate and forms of costs....................................................................... 8 5.3 Final grant amount — Calculation...................................................................................................... 9 5.4 Revised final grant amount — Calculation....................................................................................... 10 ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS................................................................................11 6.1 General conditions for costs to be eligible........................................................................................ 11 6.2 Specific conditions for costs to be eligible........................................................................................11 6.3 Conditions for costs of affiliated entities to be eligible.....................................................................14 6.4 Ineligible costs....................................................................................................................................14 6.5 Consequences of declaration of ineligible costs................................................................................ 15 CHAPTER 4 RIGHTS AND OBLIGATIONS OF THE PARTIES........................................................................ 15 SECTION 1 RIGHTS AND OBLIGATIONS RELATED TO IMPLEMENTING THE ACTION................ 15 ARTICLE 7 — GENERAL OBLIGATION TO PROPERLY IMPLEMENT THE ACTION.........................15 7.1 General obligation to properly implement the action........................................................................ 15 7.2 Consequences of non-compliance...................................................................................................... 15 ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD PARTIES INVOLVED IN THE ACTION.........................................................................................................................................16 ARTICLE 8a — IMPLEMENTATION OF ACTION TASKS BY BENEFICIARIES NOT RECEIVING EU FUNDING...................................................................................................................................... 16 ARTICLE 9 — PURCHASE OF GOODS, WORKS OR SERVICES............................................................16 9.1 Rules for purchasing goods, works or services................................................................................. 16 3 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 9.2 Consequences of non-compliance...................................................................................................... 16 ARTICLE 10 — IMPLEMENTATION OF ACTION TASKS BY SUBCONTRACTORS............................17 10.1 Rules for subcontracting action tasks.............................................................................................. 17 10.2 Consequences of non-compliance.................................................................................................... 17 ARTICLE 11 — IMPLEMENTATION OF ACTION TASKS BY AFFILIATED ENTITIES........................17 ARTICLE 11a — FINANCIAL SUPPORT TO THIRD PARTIES.................................................................18 SECTION 2 RIGHTS AND OBLIGATIONS RELATED TO THE GRANT ADMINISTRATION.............. 18 ARTICLE 12 — GENERAL OBLIGATION TO INFORM............................................................................18 12.1 General obligation to provide information upon request.................................................................18 12.2 Obligation to keep information up to date and to inform about events and circumstances likely to affect the Agreement........................................................................................................................18 12.3 Consequences of non-compliance.................................................................................................... 18 ARTICLE 13 — KEEPING RECORDS — SUPPORTING DOCUMENTATION.........................................18 13.1 Obligation to keep records and other supporting documentation.................................................... 18 13.2 Consequences of non-compliance.................................................................................................... 19 ARTICLE 14 — SUBMISSION OF DELIVERABLES................................................................................. 20 14.1 Obligation to submit deliverables.................................................................................................... 20 14.2 Consequences of non-compliance.................................................................................................... 20 ARTICLE 15 — REPORTING — PAYMENT REQUESTS.......................................................................... 20 15.1 Obligation to submit reports............................................................................................................ 20 15.2 Reporting periods............................................................................................................................. 20 15.2a Request(s) for further pre-financing payment(s)............................................................................20 15.3 Periodic reports — Requests for interim payments.........................................................................20 15.4 Final report — Request for payment of the balance....................................................................... 22 15.5 Information on cumulative expenditure incurred.............................................................................22 15.6 Currency for financial statements and conversion into euro........................................................... 22 15.7 Language of reports..........................................................................................................................22 15.8 Consequences of non-compliance.................................................................................................... 22 ARTICLE 16 — PAYMENTS AND PAYMENT ARRANGEMENTS...........................................................23 16.1 Payments to be made....................................................................................................................... 23 16.2 Pre-financing payment — Amount .................................................................................................23 16.3 Interim payments — Amount — Calculation..................................................................................23 16.4 Payment of the balance — Amount — Calculation........................................................................ 24 16.5 Notification of amounts due.............................................................................................................24 16.6 Currency for payments..................................................................................................................... 25 4 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 16.7 Payments to the coordinator — Distribution to the beneficiaries....................................................25 16.8 Bank account for payments..............................................................................................................25 16.9 Costs of payment transfers...............................................................................................................25 16.10 Date of payment............................................................................................................................. 25 16.11 Consequences of non-compliance.................................................................................................. 25 ARTICLE 17 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF FINDINGS..................................................................................................................................... 26 17.1 Checks, reviews and audits by the Agency and the Commission....................................................26 17.2 Investigations by the European Anti-Fraud Office (OLAF)............................................................28 17.3 Checks and audits by the European Court of Auditors (ECA)........................................................28 17.4 Checks, reviews, audits and investigations for international organisations..................................... 28 17.5 Consequences of findings in checks, reviews, audits and investigations — Extension of findings............................................................................................................................................. 28 17.6 Consequences of non-compliance.................................................................................................... 30 ARTICLE 18 — EVALUATION OF THE IMPACT OF THE ACTION....................................................... 30 18.1 Right to evaluate the impact of the action.......................................................................................30 18.2 Consequences of non-compliance.................................................................................................... 30 SECTION 3 OTHER RIGHTS AND OBLIGATIONS.......................................................................................31 ARTICLE 19 — PRE-EXISTING RIGHTS AND OWNERSHIP OF THE RESULTS (INCLUDING INTELLECTUAL AND INDUSTRIAL PROPERTY RIGHTS)................................................. 31 19.1 Pre-existing rights and access rights to pre-existing rights............................................................. 31 19.2 Ownership of results and rights of use............................................................................................ 31 19.3 Consequences of non-compliance.................................................................................................... 31 ARTICLE 20 — CONFLICT OF INTERESTS.............................................................................................. 31 20.1 Obligation to avoid a conflict of interests....................................................................................... 31 20.2 Consequences of non-compliance.................................................................................................... 31 ARTICLE 21 — CONFIDENTIALITY...........................................................................................................32 21.1 General obligation to maintain confidentiality................................................................................ 32 21.2 Consequences of non-compliance.................................................................................................... 32 ARTICLE 22 — PROMOTING THE ACTION — VISIBILITY OF EU FUNDING....................................32 22.1 Communication activities by the beneficiaries................................................................................ 32 22.2 Communication activities by the Agency and the Commission...................................................... 33 22.3 Consequences of non-compliance.................................................................................................... 34 ARTICLE 23 — PROCESSING OF PERSONAL DATA...............................................................................34 23.1 Processing of personal data by the Agency and the Commission................................................... 34 23.2 Processing of personal data by the beneficiaries............................................................................. 34 5 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 23.3 Consequences of non-compliance.................................................................................................... 35 ARTICLE 24 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE AGENCY....................35 CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES....................................... 35 ARTICLE 25 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES............................35 25.1 Roles and responsibilities towards the Agency............................................................................... 35 25.2 Internal division of roles and responsibilities.................................................................................. 35 25.3 Internal arrangements between beneficiaries — Consortium agreement.........................................36 CHAPTER 6 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY — SANCTIONS — DAMAGES — SUSPENSION — TERMINATION — FORCE MAJEURE................................ 37 SECTION 1 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY — SANCTIONS.............................................................................................................................................. 37 ARTICLE 26 — REJECTION OF INELIGIBLE COSTS.............................................................................. 37 26.1 Conditions......................................................................................................................................... 37 26.2 Ineligible costs to be rejected — Calculation — Procedure............................................................37 26.3 Effects............................................................................................................................................... 37 ARTICLE 27 — REDUCTION OF THE GRANT......................................................................................... 38 27.1 Conditions......................................................................................................................................... 38 27.2 Amount to be reduced — Calculation — Procedure.......................................................................38 27.3 Effects............................................................................................................................................... 38 ARTICLE 28 — RECOVERY OF UNDUE AMOUNTS............................................................................... 39 28.1 Amount to be recovered — Calculation — Procedure....................................................................39 ARTICLE 29 — ADMINISTRATIVE SANCTIONS..................................................................................... 41 SECTION 2 LIABILITY FOR DAMAGES.........................................................................................................41 ARTICLE 30 — LIABILITY FOR DAMAGES.............................................................................................41 30.1 Liability of the Agency.................................................................................................................... 41 30.2 Liability of the beneficiaries............................................................................................................ 41 SECTION 3 SUSPENSION AND TERMINATION............................................................................................41 ARTICLE 31 — SUSPENSION OF PAYMENT DEADLINE....................................................................... 41 31.1 Conditions......................................................................................................................................... 41 31.2 Procedure.......................................................................................................................................... 42 ARTICLE 32 — SUSPENSION OF PAYMENTS.......................................................................................... 42 32.1 Conditions......................................................................................................................................... 42 32.2 Procedure.......................................................................................................................................... 42 ARTICLE 33 — SUSPENSION OF THE ACTION IMPLEMENTATION................................................... 43 33.1 Suspension of the action implementation, by the beneficiaries.......................................................43 33.2 Suspension of the action implementation, by the Agency...............................................................43 6 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 ARTICLE 34 — TERMINATION OF THE AGREEMENT OR OF THE PARTICIPATION OF ONE OR MORE BENEFICIARIES..............................................................................................................45 34.1 Termination of the Agreement, by the beneficiaries........................................................................45 34.2 Termination of the participation of one or more beneficiaries, by the beneficiaries........................45 34.3 Termination of the Agreement or of the participation of one or more beneficiaries, by the Agency..............................................................................................................................................46 SECTION 4 FORCE MAJEURE.......................................................................................................................... 49 ARTICLE 35 — FORCE MAJEURE.............................................................................................................. 49 CHAPTER 7 FINAL PROVISIONS...........................................................................................................................50 ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES...............................................................50 36.1 Form and means of communication.................................................................................................50 36.2 Date of communication.................................................................................................................... 50 36.3 Addresses for communication.......................................................................................................... 50 ARTICLE 37 — INTERPRETATION OF THE AGREEMENT.....................................................................51 37.1 Precedence of the Terms and Conditions over the Annexes............................................................51 37.2 Privileges and immunities................................................................................................................ 51 ARTICLE 38 — CALCULATION OF PERIODS, DATES AND DEADLINES........................................... 51 ARTICLE 39 — AMENDMENTS TO THE AGREEMENT......................................................................... 51 39.1 Conditions......................................................................................................................................... 51 39.2 Procedure.......................................................................................................................................... 51 ARTICLE 40 — ACCESSION TO THE AGREEMENT............................................................................... 52 40.1 Accession of the beneficiaries mentioned in the preamble..............................................................52 40.2 Addition of new beneficiaries.......................................................................................................... 52 ARTICLE 41 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES.............................................. 53 41.1 Applicable law..................................................................................................................................53 41.2 Dispute settlement............................................................................................................................ 53 ARTICLE 42 — ENTRY INTO FORCE OF THE AGREEMENT................................................................ 53 7 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 CHAPTER 1 GENERAL ARTICLE 1 — SUBJECT OF THE AGREEMENT This Agreement sets out the rights and obligations and the terms and conditions applicable to the grant awarded to the beneficiaries for implementing the action set out in Chapter 2. CHAPTER 2 ACTION ARTICLE 2 — ACTION TO BE IMPLEMENTED The grant is awarded for the action entitled ‘Empowering EU health policies on Task SHIfting — TaSHI’ (‘action’), as described in Annex 1. ARTICLE 3 — DURATION AND STARTING DATE OF THE ACTION The duration of the action will be 36 months as of 01/04/2021 (‘starting date of the action’). ARTICLE 4 — ESTIMATED BUDGET AND BUDGET TRANSFERS 4.1 Estimated budget The ‘estimated budget’ for the action is set out in Annex 2. It contains the estimated eligible costs and the forms of costs, broken down by beneficiary and budget category (see Articles 5, 6). 4.2 Budget transfers The estimated budget breakdown indicated in Annex 2 may be adjusted — without an amendment (see Article 39) — by transfers of amounts between beneficiaries, budget categories and/or forms of costs set out in Annex 2, if the action is implemented as described in Annex 1. However, the beneficiaries may not add costs relating to subcontracts not provided for in Annex 1, unless such additional subcontracts are approved by an amendment or in accordance with Article 10. CHAPTER 3 GRANT ARTICLE 5 — GRANT AMOUNT, FORM OF GRANT, REIMBURSEMENT RATE AND FORMS OF COSTS 5.1 Maximum grant amount The ‘maximum grant amount’ is EUR 389 668.00 (three hundred and eighty nine thousand six hundred and sixty eight EURO). 5.2 Form of grant, reimbursement rate and forms of costs 8 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 The grant reimburses 60% of the action's eligible costs (see Article 6) (‘reimbursement of eligible costs grant’) (see Annex 2). The estimated eligible costs of the action are EUR 649 448.27 (six hundred and forty nine thousand four hundred and forty eight EURO and twenty seven eurocents). Eligible costs (see Article 6) must be declared under the following forms ('forms of costs' or 'costs forms'): (a) for direct personnel costs: as actually incurred costs (actual costs); (b) for direct costs of subcontracting: as actually incurred costs (actual costs); (c) for other direct costs: as actually incurred costs (actual costs); (d) for indirect costs: on the basis of a flat-rate applied as set out in Article 6.2.D (‘flat-rate costs’); 5.3 Final grant amount — Calculation The ‘final grant amount’ depends on the actual extent to which the action is implemented in accordance with the Agreement’s terms and conditions. This amount is calculated by the Agency — when the payment of the balance is made — in the following steps: Step 1 – Application of the reimbursement rate to the eligible costs Step 2 – Limit to the maximum grant amount Step 3 – Reduction due to the no-profit rule Step 4 – Reduction due to substantial errors, irregularities or fraud or serious breach of obligations 5.3.1 Step 1 — Application of the reimbursement rate to the eligible costs The reimbursement rate (see Article 5.2) is applied to the eligible costs (actual costs and flat-rate costs; see Article 6) declared by the beneficiaries (see Article 15) and approved by the Agency (see Article 16). 5.3.2 Step 2 — Limit to the maximum grant amount If the amount obtained following Step 1 is higher than the maximum grant amount set out in Article 5.1, it will be limited to the latter. 5.3.3 Step 3 — Reduction due to the no-profit rule The grant must not produce a profit. ‘Profit’ means the surplus of the amount obtained following Steps 1 and 2 plus the action’s total receipts, over the action’s total eligible costs. The ‘action’s total eligible costs’ are the consolidated total eligible costs approved by the Agency. 9 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 The ‘action’s total receipts’ are the consolidated total receipts generated during its duration (see Article 3). The following are considered receipts: (a) income generated by the action; (b) financial contributions given by third parties to the beneficiary specifically to be used for costs that are eligible under the action. The following are however not considered receipts: (a) financial contributions by third parties, if they may be used to cover costs other than the eligible costs (see Article 6); (b) financial contributions by third parties with no obligation to repay any amount unused at the end of the period set out in Article 3. If there is a profit, it will be deducted in proportion to the final rate of reimbursement of the eligible actual costs approved by the Agency (as compared to the amount calculated following Steps 1 and 2). 5.3.4 Step 4 — Reduction due to substantial errors, irregularities or fraud or serious breach of obligations If the grant is reduced (see Article 27), the Agency will calculate the reduced grant amount by deducting the amount of the reduction (calculated in proportion to the seriousness of the errors, irregularities or fraud or breach of obligations, in accordance with Article 27.2) from the maximum grant amount set out in Article 5.1. The final grant amount will be the lower of the following two: - the amount obtained following Steps 1 to 3 or - the reduced grant amount following Step 4. 5.4 Revised final grant amount — Calculation If — after the payment of the balance (in particular, after checks, reviews, audits or investigations; see Article 17) — the Agency rejects costs (see Article 26) or reduces the grant (see Article 27), it will calculate the ‘revised final grant amount’ for the action or for the beneficiary concerned. This amount is calculated by the Agency on the basis of the findings, as follows: - in case of rejection of costs: by applying the reimbursement rate to the revised eligible costs approved by the Agency for the beneficiary concerned; - in case of reduction of the grant: by deducting the amount of the reduction (calculated in proportion to the seriousness of the errors, irregularities or fraud or breach of obligations, in accordance with Article 27.2) from the maximum grant amount set out in Article 5.1 or from the maximum EU contribution indicated for the beneficiary in the estimated budget (see Annex 2). In case of rejection of costs and reduction of the grant, the revised final grant amount will be the lower of the two amounts above. 10 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS 6.1 General conditions for costs to be eligible ‘Eligible costs’ are costs that meet the following criteria: (a) for actual costs: (i) they must be actually incurred by the beneficiary; (ii) they must be incurred in the period set out in Article 3, with the exception of costs relating to the submission of the periodic report for the last reporting period and the final report (see Article 15); (iii) they must be indicated in the estimated budget set out in Annex 2; (iv) they must be incurred in connection with the action as described in Annex 1 and necessary for its implementation; (v) they must be identifiable and verifiable, in particular recorded in the beneficiary’s accounts in accordance with the accounting standards applicable in the country where the beneficiary is established and with the beneficiary’s usual cost accounting practices; (vi) they must comply with the applicable national law on taxes, labour and social security, and (vii) they must be reasonable, justified and must comply with the principle of sound financial management, in particular regarding economy and efficiency; (b) for unit costs: not applicable; (c) for flat-rate costs: (i) they must be calculated by applying the flat-rate set out in Annex 2, and (ii) the costs (actual costs) to which the flat-rate is applied must comply with the conditions for eligibility set out in this Article. (d) for lump sum costs: not applicable; 6.2 Specific conditions for costs to be eligible Costs are eligible if they comply with the general conditions (see above) and the specific conditions set out below, for each of the following budget categories: A. direct personnel costs; B. direct costs of subcontracting; C. other direct costs; D. indirect costs; ‘Direct costs’ are costs that are directly linked to the action implementation and can therefore be attributed to it directly. They must not include any indirect costs (see Point D below). 11 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 ‘Indirect costs’ are costs that are not directly linked to the action implementation and therefore cannot be attributed directly to it. A. Direct personnel costs Types of eligible personnel costs A.1 Personnel costs are eligible if they are related to personnel working for the beneficiary under an employment contract (or equivalent appointing act) and assigned to the action (‘costs for employees (or equivalent)’). They must be limited to salaries, social security contributions, taxes and other costs included in the remuneration, if they arise from national law or the employment contract (or equivalent appointing act). They may also include additional remuneration for personnel assigned to the action (including payments on the basis of supplementary contracts regardless of their nature), if: (a) it is part of the beneficiary’s usual remuneration practices and is paid in a consistent manner whenever the same kind of work or expertise is required; (b) the criteria used to calculate the supplementary payments are objective and generally applied by the beneficiary, regardless of the source of funding used. A.2 The costs for natural persons working under a direct contract with the beneficiary other than an employment contract or seconded by a third party against payment are eligible personnel costs, if: (a) the person works under the beneficiary’s instructions and, unless otherwise agreed with the beneficiary, on the beneficiary’s premises; (b) the result of the work carried out belongs to the beneficiary, and (c) the costs are not significantly different from those for personnel performing similar tasks under an employment contract with the beneficiary. Calculation Personnel costs must be calculated by the beneficiaries as follows: - for persons working exclusively on the action: {monthly rate for the person multiplied by number of actual months worked on the action}. The months declared for these persons may not be declared for any other EU or Euratom grant. The ‘monthly rate’ is calculated as follows: {annual personnel costs for the person divided by 12} 12 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 using the personnel costs for each full financial year covered by the reporting period concerned. If a financial year is not closed at the end of the reporting period, the beneficiaries must use the monthly rate of the last closed financial year available. - for all other persons: {daily rate for the person multiplied by number of actual days worked on the action (rounded up or down to the nearest half-day)}. The number of actual days declared for a person must be identifiable and verifiable (see Article 13). The total number of days declared in EU or Euratom grants, for a person for a year, cannot be higher than the annual productive days used for the calculations of the daily rate. Therefore, the maximum number of days that can be declared for the grant are: {number of annual productive days for the year (see below) minus total number of days declared by the beneficiary, for that person for that year, for other EU or Euratom grants}. The ‘daily rate’ is calculated as follows: {annual personnel costs for the person divided by number of individual annual productive days} using the personnel costs and the number of annual productive days for each full financial year covered by the reporting period concerned. If a financial year is not closed at the end of the reporting period, the beneficiaries must use the daily rate of the last closed financial year available. The ‘number of individual annual productive days’ is the total actual days worked by the person in the year. It may not include holidays and other absences (such as sick leave, maternity leave, special leave, etc). However, it may include overtime and time spent in meetings, trainings and other similar activities. B. Direct costs of subcontracting (including related duties, taxes and charges, such as non- deductible value added tax (VAT) paid by beneficiaries that are not public bodies acting as public authority) are eligible if the conditions in Article 10.1.1 are met. C. Other direct costs C.1 Travel costs and related subsistence allowances (including related duties, taxes and charges, such as non-deductible value added tax (VAT) paid by beneficiaries that are not public bodies acting as public authority) are eligible if they are in line with the beneficiary’s usual practices on travel. C.2 The depreciation costs of equipment, infrastructure or other assets (new or second-hand) as recorded in the beneficiary’s accounts are eligible, if they were purchased in accordance 13 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 with Article 9.1.1 and written off in accordance with international accounting standards and the beneficiary’s usual accounting practices. The costs of renting or leasing equipment, infrastructure or other assets (including related duties, taxes and charges, such as non-deductible value added tax (VAT) paid by beneficiaries that are not public bodies acting as public authority) are also eligible, if they do not exceed the depreciation costs of similar equipment, infrastructure or assets and do not include any financing fees. The only portion of the costs that will be taken into account is that which corresponds to the duration of the action and rate of actual use for the purposes of the action. C.3 Costs of other goods and services (including related duties, taxes and charges, such as non- deductible value added tax (VAT) paid by beneficiaries that are not public bodies acting as public authority) are eligible, if they are purchased specifically for the action and in accordance with Article 9.1.1. Such goods and services include, for instance, consumables and supplies, dissemination, protection of results, certificates on the financial statements (if they are required by the Agreement), translations and publications. D. Indirect costs Indirect costs are eligible if they are declared on the basis of the flat-rate of 7% of the eligible direct costs (see Article 5.2 and Points A to C above). Beneficiaries receiving an operating grant1 financed by the EU or Euratom budget cannot declare indirect costs for the period covered by the operating grant. 6.3 Conditions for costs of affiliated entities to be eligible not applicable 6.4 Ineligible costs ‘Ineligible costs’ are: (a) costs that do not comply with the conditions set out above (Article 6.1 to 6.3), in particular: (i) costs related to return on capital; (ii) debt and debt service charges; (iii) provisions for future losses or debts; (iv) interest owed; 1 For the definition, see Article 121(1)(b) of Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing Council Regulation (EC, Euratom) No 1605/2002 (OJ L 218, 26.10.2012, p.1) (‘Financial Regulation No 966/2012’): ‘operating grant’ means direct financial contribution, by way of donation, from the budget in order to finance the functioning of a body which pursues an aim of general EU interest or has an objective forming part of and supporting an EU policy. 14 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 (v) doubtful debts; (vi) currency exchange losses; (vii) bank costs charged by the beneficiary’s bank for transfers from the Agency; (viii) excessive or reckless expenditure; (ix) deductible VAT; (x) costs incurred during suspension of the implementation of the action (see Article 33); (xi) in-kind contributions provided by third parties; (b) costs declared under another EU or Euratom grant (including grants awarded by a Member State and financed by the EU or Euratom budget and grants awarded by bodies other than the Agency for the purpose of implementing the EU or Euratom budget); in particular, indirect costs if the beneficiary is already receiving an operating grant financed by the EU or Euratom budget in the same period; (c) costs for staff of a national (or local) administration, for activities that are part of the administration’s normal activities (i.e. not undertaken only because of the grant); (d) costs (especially travel and subsistence costs) for staff or representatives of EU institutions, bodies or agencies. 6.5 Consequences of declaration of ineligible costs Declared costs that are ineligible will be rejected (see Article 26). This may also lead to any of the other measures described in Chapter 6. CHAPTER 4 RIGHTS AND OBLIGATIONS OF THE PARTIES SECTION 1 RIGHTS AND OBLIGATIONS RELATED TO IMPLEMENTING THE ACTION ARTICLE 7 — GENERAL OBLIGATION TO PROPERLY IMPLEMENT THE ACTION 7.1 General obligation to properly implement the action The beneficiaries must implement the action as described in Annex 1 and in compliance with the provisions of the Agreement and all legal obligations under applicable EU, international and national law. 7.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 27). 15 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD PARTIES INVOLVED IN THE ACTION The beneficiaries must have the appropriate resources to implement the action. If it is necessary to implement the action, the beneficiaries may: - purchase goods, works and services (see Article 9); - call upon subcontractors to implement action tasks described in Annex 1 (see Article 10); - call upon affiliated entities to implement action tasks described in Annex 1 (see Article 11). In these cases, the beneficiaries retain sole responsibility towards the Agency and the other beneficiaries for implementing the action. ARTICLE 8a — IMPLEMENTATION OF ACTION TASKS BY BENEFICIARIES NOT RECEIVING EU FUNDING Not applicable ARTICLE 9 — PURCHASE OF GOODS, WORKS OR SERVICES 9.1 Rules for purchasing goods, works or services 9.1.1 If necessary to implement the action, the beneficiaries may purchase goods, works or services. The beneficiaries must make such purchases ensuring the best value for money or, if appropriate, the lowest price. In doing so, they must avoid any conflict of interests (see Article 20). The beneficiaries must ensure that the Agency, the Commission, the European Court of Auditors (ECA) and the European Anti-fraud Office (OLAF) can exercise their rights under Articles 17 and 18 also towards their contractors. 9.1.2 Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC2 (or 2014/24/EU3) or ‘contracting entities’ within the meaning of Directive 2004/17/EC4 (or 2014/25/EU5) must comply with the applicable national law on public procurement. 9.2 Consequences of non-compliance 2 Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public work contracts, public supply contracts and public service contracts (OJ L 134, 30.04.2004, p. 114). 3 Directive 2014/24/EU of the European Parliament and of the Council of 26 February 2014 on public procurement and repealing Directive 2004/18/EC (OJ L 94, 28.3.2014, p. 65). 4 Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the procurement procedures of entities operating in the water, energy, transport and postal services sectors (OJ L 134, 30.04.2004, p. 1). 5 Directive 2014/25/EU of the European Parliament and of the Council of 26 February 2014 on procurement by entities operating in the water, energy, transport and postal services sectors and repealing Directive 2004/17/EC (OJ L 94, 28.3.2014, p. 243). 16 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 If a beneficiary breaches any of its obligations under Article 9.1.1, the costs related to the contract concerned will be ineligible (see Article 6) and will be rejected (see Article 26). If a beneficiary breaches any of its obligations under Article 9.1.2, the grant may be reduced (see Article 27). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 10 — IMPLEMENTATION OF ACTION TASKS BY SUBCONTRACTORS 10.1 Rules for subcontracting action tasks 10.1.1 If necessary to implement the action, the beneficiaries may award subcontracts covering the implementation of certain action tasks described in Annex 1. Subcontracting may cover only a limited part of the action. The beneficiaries must award the subcontracts ensuring the best value for money or, if appropriate, the lowest price. In doing so, they must avoid any conflict of interests (see Article 20). The tasks to be implemented and the estimated cost for each subcontract must be set out in Annex 1 and the total estimated costs of subcontracting per beneficiary must be set out in Annex 2. The Agency may however approve subcontracts not set out in Annex 1 and 2 without amendment (see Article 39), if: - they are specifically justified in the periodic technical report and - they do not entail changes to the Agreement which would call into question the decision awarding the grant or breach the principle of equal treatment of applicants. The beneficiaries must ensure that the Agency, the Commission, the European Court of Auditors (ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 17 and 18 also towards their subcontractors. 10.1.2 The beneficiaries must ensure that their obligations under Articles 20, 21, 22 and 30 also apply to the subcontractors. Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC (or 2014/24/EU) or ‘contracting entities’ within the meaning of Directive 2004/17/EC (or 2014/25/EU) must comply with the applicable national law on public procurement. 10.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under Article 10.1.1, the costs related to the subcontract concerned will be ineligible (see Article 6) and will be rejected (see Article 26). If a beneficiary breaches any of its obligations under Article 10.1.2, the grant may be reduced (see Article 27). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 11 — IMPLEMENTATION OF ACTION TASKS BY AFFILIATED ENTITIES 17 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 Not applicable ARTICLE 11a — FINANCIAL SUPPORT TO THIRD PARTIES Not applicable SECTION 2 RIGHTS AND OBLIGATIONS RELATED TO THE GRANT ADMINISTRATION ARTICLE 12 — GENERAL OBLIGATION TO INFORM 12.1 General obligation to provide information upon request The beneficiaries must provide — during implementation of the action or afterwards and in accordance with Article 25.2 — any information requested in order to verify eligibility of the costs, proper implementation of the action and compliance with any other obligation under the Agreement. 12.2 Obligation to keep information up to date and to inform about events and circumstances likely to affect the Agreement Each beneficiary must keep information stored in the Participant Portal Beneficiary Register (via the electronic exchange system; see Article 36) up to date, in particular, its name, address, legal representatives, legal form and organisation type. Each beneficiary must immediately inform the coordinator — which must immediately inform the Agency and the other beneficiaries — of any of the following: (a) events which are likely to affect significantly or delay the implementation of the action or the EU’s financial interests, in particular: (i) changes in its legal, financial, technical, organisational or ownership situation (b) circumstances affecting: (i) the decision to award the grant or (ii) compliance with requirements under the Agreement. 12.3 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 27). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 13 — KEEPING RECORDS — SUPPORTING DOCUMENTATION 13.1 Obligation to keep records and other supporting documentation The beneficiaries must — for a period of five years after the payment of the balance — keep records 18 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 and other supporting documentation, in order to prove the proper implementation of the action and the costs they declare as eligible. They must make them available upon request (see Article 12) or in the context of checks, reviews, audits or investigations (see Article 17). If there are on-going checks, reviews, audits, investigations, litigation or other pursuits of claims under the Agreement (including the extension of findings; see Article 17), the beneficiaries must keep the records and other supporting documentation until the end of these procedures. The beneficiaries must keep the original documents. Digital and digitalised documents are considered originals if they are authorised by the applicable national law. The Agency may accept non-original documents if it considers that they offer a comparable level of assurance. 13.1.1 Records and other supporting documentation on the technical implementation The beneficiaries must keep records and other supporting documentation on the technical implementation of the action, in line with the accepted standards in the respective field. 13.1.2 Records and other documentation to support the costs declared The beneficiaries must keep the records and documentation supporting the costs declared, in particular the following: (a) for actual costs: adequate records and other supporting documentation to prove the costs declared, such as contracts, subcontracts, invoices and accounting records. In addition, the beneficiaries’ usual cost accounting practices and internal control procedures must enable direct reconciliation between the amounts declared, the amounts recorded in their accounts and the amounts stated in the supporting documentation; (b) for unit costs: not applicable; (c) for flat-rate costs: adequate records and other supporting documentation to prove the eligibility of the costs to which the flat-rate is applied. The beneficiaries do not need to identify the costs covered or provide supporting documentation (such as accounting statements) to prove the amount declared at a flat-rate; (d) for lump sum costs: not applicable; In addition, for personnel costs (declared as actual costs), the beneficiaries must keep time records for the number of days declared. The time records must be in writing and approved by the persons working on the action and their supervisors, at least monthly. In the absence of reliable time records of the days worked on the action, the Agency may accept alternative evidence supporting the number of days declared, if it considers that it offers an adequate level of assurance. As an exception, for persons working exclusively on the action, there is no need to keep time records, if the beneficiary signs a declaration confirming that the persons concerned have worked exclusively on the action. 13.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, costs insufficiently substantiated 19 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 will be ineligible (see Article 6) and will be rejected (see Article 26), and the grant may be reduced (see Article 27). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 14 — SUBMISSION OF DELIVERABLES 14.1 Obligation to submit deliverables The coordinator must submit the ‘deliverables’ identified in Annex 1, in accordance with the timing and conditions set out in it. 14.2 Consequences of non-compliance If the coordinator breaches any of its obligations under this Article, the Agency may apply any of the measures described in Chapter 6. ARTICLE 15 — REPORTING — PAYMENT REQUESTS 15.1 Obligation to submit reports The coordinator must submit to the Agency (see Article 36) the technical and financial report(s) set out in this Article. These reports include request(s) for payment and must be drawn up using the forms and templates provided in the electronic exchange system (see Article 36). 15.2 Reporting periods The action is divided into the following ‘reporting periods’: - RP1: from month 1 to month 18 - RP2: from month 19 to month 36 15.2a Request(s) for further pre-financing payment(s) Not applicable 15.3 Periodic reports — Requests for interim payments The coordinator must submit a periodic report within 60 days following the end of each reporting period. The periodic report must include the following: (a) a ‘periodic technical report’ containing: (i) an explanation of the work carried out by the beneficiaries; (ii) an overview of the progress towards the objectives of the action, including milestones and deliverables identified in Annex 1. This report must include explanations justifying the differences between work expected to be carried out in accordance with Annex 1 and that actually carried out; 20 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 (iii) a summary for publication by the Agency; (iv) the answers to the ‘questionnaire’: covering issues related to the action implementation and its impact; (b) a ‘periodic financial report’ containing: (i) an ‘individual financial statement’ (see Annex 4) from each beneficiary, for the reporting period concerned. The individual financial statement must detail the eligible costs (actual costs and flat-rate costs; see Article 6) for each budget category (see Annex 2). The beneficiaries must declare all eligible costs, even if — for actual costs and flat- rate costs — they exceed the amounts indicated in the estimated budget (see Annex 2). Amounts which are not declared in the individual financial statement will not be taken into account by the Agency. If an individual financial statement is not submitted for a reporting period, it may be included in the periodic financial report for the next reporting period. The individual financial statements of the last reporting period must also detail the receipts of the action (see Article 5.3.3). Each beneficiary must certify that: - the information provided is full, reliable and true; - the costs declared are eligible (see Article 6); - the costs can be substantiated by adequate records and supporting documentation (see Article 13) that will be produced upon request (see Article 12) or in the context of checks, reviews, audits and investigations (see Article 17), and - for the last reporting period: that all the receipts have been declared (see Article 5.3.3); (ii) an explanation of the use of resources and the information on subcontracting (see Article 10) from each beneficiary, for the reporting period concerned; (iii) not applicable; (iv) a ‘periodic summary financial statement’, created automatically by the electronic exchange system, consolidating the individual financial statements for the reporting period concerned and including — except for the last reporting period — the request for interim payment; (v) a ‘certificate on the financial statements’ (drawn up in accordance with Annex 5) for each beneficiary, if: - the (cumulative) amount of EU contribution it requests as reimbursement of actual 21 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 costs (and for which no certificate has yet been submitted) is EUR 150 000 or more and - the maximum EU contribution indicated, for that beneficiary, in the estimated budget (see Annex 2) as reimbursement of actual costs is EUR 200 000 or more. 15.4 Final report — Request for payment of the balance In addition to the periodic report for the last reporting period, the coordinator must submit the final report within 60 days following the end of the last reporting period. The final report must include the following: (a) a ‘final technical report’ with a summary for publication containing: (i) an overview of the results and their dissemination; (ii) the conclusions on the action and (iii) the impact of the action; (b) a ‘final financial report’ containing a ‘final summary financial statement’, created automatically by the electronic exchange system, consolidating the individual financial statements for all reporting periods and including the request for payment of the balance. 15.5 Information on cumulative expenditure incurred Not applicable 15.6 Currency for financial statements and conversion into euro Financial statements must be drafted in euro. Beneficiaries with accounting established in a currency other than the euro must convert the costs recorded in their accounts into euro at the average of the daily exchange rates published in the C series of the Official Journal of the European Union, calculated over the corresponding reporting period. If no daily euro exchange rate is published in the Official Journal of the European Union for the currency in question, they must be converted at the average of the monthly accounting rates published on the Commission’s website, calculated over the corresponding reporting period. Beneficiaries with accounting established in euro must convert costs incurred in another currency into euro according to their usual accounting practices. 15.7 Language of reports All report(s) (including financial statements) must be submitted in the language of the Agreement. 15.8 Consequences of non-compliance If the report(s) submitted do not comply with this Article, the Agency may suspend the payment deadline (see Article 31) and apply any of the other measures described in Chapter 6. 22 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 If the coordinator breaches its obligation to submit the report(s) and if it fails to comply with this obligation within 30 days following a written reminder, the Agency may terminate the Agreement (see Article 34) or apply any of the other measures described in Chapter 6. ARTICLE 16 — PAYMENTS AND PAYMENT ARRANGEMENTS 16.1 Payments to be made The following payments will be made to the coordinator: - a pre-financing payment; - one or more interim payments, on the basis of the request(s) for interim payment (see Article 15), and - one payment of the balance, on the basis of the request for payment of the balance (see Article 15). 16.2 Pre-financing payment — Amount The aim of the pre-financing is to provide the beneficiaries with a float. It remains the property of the EU until the payment of the balance. The amount of the pre-financing payment will be EUR 194 834.00 (one hundred and ninety four thousand eight hundred and thirty four EURO). The Agency will — except if Article 32 applies — make the pre-financing payment to the coordinator within 30 days, either from the entry into force of the Agreement (see Article 42) or from 10 days before the starting date of the action (see Article 3) , whichever is the latest. 16.3 Interim payments — Amount — Calculation Interim payments reimburse the eligible costs incurred for the implementation of the action during the corresponding reporting periods. The Agency will pay to the coordinator the amount due as interim payment within 90 days from receiving the periodic report (see Article 15.3), except if Articles 31 or 32 apply. Payment is subject to the approval of the periodic report. Its approval does not imply recognition of compliance, authenticity, completeness or correctness of its content. The amount due as interim payment is calculated by the Agency in the following steps: Step 1 – Application of the reimbursement rate Step 2 – Limit to 90% of the maximum grant amount 16.3.1 Step 1 — Application of the reimbursement rate The reimbursement rate (see Article 5.2) is applied to the eligible costs (actual costs and flat-rate costs; see Article 6) declared by the beneficiaries (see Article 15) and approved by the Agency (see above) for the concerned reporting period. 23 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 16.3.2 Step 2 — Limit to 90% of the maximum grant amount The total amount of pre-financing and interim payments must not exceed 90% of the maximum grant amount set out in Article 5.1. The maximum amount for the interim payment will be calculated as follows: {90% of the maximum grant amount (see Article 5.1) minus {pre-financing and previous interim payments}}. 16.4 Payment of the balance — Amount — Calculation The payment of the balance reimburses the remaining part of the eligible costs incurred by the beneficiaries for the implementation of the action. If the total amount of earlier payments is greater than the final grant amount (see Article 5.3), the payment of the balance takes the form of a recovery (see Article 28). If the total amount of earlier payments is lower than the final grant amount, the Agency will pay the balance within 90 days from receiving the final report (see Article 15.4), except if Articles 31 or 32 apply. Payment is subject to the approval of the final report. Its approval does not imply recognition of compliance, authenticity, completeness or correctness of its content. The amount due as the balance is calculated by the Agency by deducting the total amount of pre- financing and interim payments (if any) already made, from the final grant amount determined in accordance with Article 5.3: {final grant amount (see Article 5.3) minus {pre-financing and interim payments (if any) made}}. If the balance is positive, it will be paid to the coordinator. The amount to be paid may however be offset — without the beneficiaries’ consent — against any other amount owed by a beneficiary to the Agency, the Commission or another executive agency (under the EU or Euratom budget), up to the maximum EU contribution indicated, for that beneficiary, in the estimated budget (see Annex 2). If the balance is negative, it will be recovered from the coordinator (see Article 28). 16.5 Notification of amounts due When making payments, the Agency will formally notify to the coordinator the amount due, specifying that it concerns an interim payment or the payment of the balance. For the payment of the balance, the notification will also specify the final grant amount. 24 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 In the case of reduction of the grant or recovery of undue amounts, the notification will be preceded by the contradictory procedure set out in Articles 27 and 28. 16.6 Currency for payments The Agency will make all payments in euro. 16.7 Payments to the coordinator — Distribution to the beneficiaries Payments will be made to the coordinator. Payments to the coordinator will discharge the Agency from its payment obligation. The coordinator must distribute the payments between the beneficiaries without unjustified delay. Pre-financing may however be distributed only: (a) if 90% of the beneficiaries have acceded to the Agreement (see Article 40) and (b) to beneficiaries that have acceded to the Agreement (see Article 40). 16.8 Bank account for payments All payments will be made to the following bank account: Name of bank: HUNGARIAN STATE TREASURY Full name of the account holder: SEMMELWEIS EGYETEM Full account number (including bank codes): IBAN code: HU51100320000028281900000000 16.9 Costs of payment transfers The cost of the payment transfers is borne as follows: - the Agency bears the cost of transfers charged by its bank; - the beneficiary bears the cost of transfers charged by its bank; - the party causing a repetition of a transfer bears all costs of the repeated transfer. 16.10 Date of payment Payments by the Agency are considered to have been carried out on the date when they are debited to its account. 16.11 Consequences of non-compliance 16.11.1 If the Agency does not pay within the payment deadlines (see above), the beneficiaries are entitled to late-payment interest at the rate applied by the European Central Bank (ECB) for its main refinancing operations in euros (‘reference rate’), plus three and a half points. The reference rate is the rate in force on the first day of the month in which the payment deadline expires, as published in the C series of the Official Journal of the European Union. 25 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 If the late-payment interest is lower than or equal to EUR 200, it will be paid to the coordinator only upon request submitted within two months of receiving the late payment. Late-payment interest is not due if all beneficiaries are EU Member States (including regional and local government authorities or other public bodies acting on behalf of a Member State for the purpose of this Agreement). Suspension of the payment deadline or payments (see Articles 31 and 32) will not be considered as late payment. Late-payment interest covers the period running from the day following the due date for payment (see above), up to and including the date of payment. Late-payment interest is not considered for the purposes of calculating the final grant amount. 16.11.2 If the coordinator breaches any of its obligations under this Article, the grant may be reduced (see Article 27) and the Agreement or the participation of the coordinator may be terminated (see Article 34). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 17 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF FINDINGS 17.1 Checks, reviews and audits by the Agency and the Commission 17.1.1 Right to carry out checks The Agency or the Commission will — during the implementation of the action or afterwards — check the proper implementation of the action and compliance with the obligations under the Agreement, including assessing deliverables and reports. For this purpose, the Agency or the Commission may be assisted by external persons or bodies. The Agency or the Commission may also request additional information in accordance with Article 12. The Agency or the Commission may request beneficiaries to provide such information to it directly. Information provided must be accurate, precise and complete and in the format requested, including electronic format. 17.1.2 Right to carry out reviews The Agency or the Commission may — during the implementation of the action or afterwards — carry out reviews on the proper implementation of the action (including assessment of deliverables and reports) and compliance with the obligations under the Agreement. Reviews may be started up to five years after the payment of the balance. They will be formally notified to the coordinator or beneficiary concerned and will be considered to have started on the date of the formal notification. If the review is carried out on a third party (see Articles 9 to 11a), the beneficiary concerned must inform the third party. 26 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 The Agency or the Commission may carry out reviews directly (using its own staff) or indirectly (using external persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned of the identity of the external persons or bodies. They have the right to object to the appointment on grounds of commercial confidentiality. The coordinator or beneficiary concerned must provide — within the deadline requested — any information and data in addition to deliverables and reports already submitted (including information on the use of resources). The Agency or the Commission may request beneficiaries to provide such information to it directly. The coordinator or beneficiary concerned may be requested to participate in meetings, including with external experts. For on-the-spot reviews, the beneficiaries must allow access to their sites and premises, including to external persons or bodies, and must ensure that information requested is readily available. Information provided must be accurate, precise and complete and in the format requested, including electronic format. On the basis of the review findings, a ‘review report’ will be drawn up. The Agency or the Commission will formally notify the review report to the coordinator or beneficiary concerned, which has 30 days to formally notify observations (‘contradictory review procedure’). Reviews (including review reports) are in the language of the Agreement. 17.1.3 Right to carry out audits The Agency or the Commission may — during the implementation of the action or afterwards — carry out audits on the proper implementation of the action and compliance with the obligations under the Agreement. Audits may be started up to five years after the payment of the balance. They will be formally notified to the coordinator or beneficiary concerned and will be considered to have started on the date of the formal notification. If the audit is carried out on a third party (see Articles 9 to 11a), the beneficiary concerned must inform the third party. The Agency or the Commission may carry out audits directly (using its own staff) or indirectly (using external persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned of the identity of the external persons or bodies. They have the right to object to the appointment on grounds of commercial confidentiality. The coordinator or beneficiary concerned must provide — within the deadline requested — any information (including complete accounts, individual salary statements or other personal data) to verify compliance with the Agreement. The Agency or the Commission may request beneficiaries to provide such information to it directly. For on-the-spot audits, the beneficiaries must allow access to their sites and premises, including to external persons or bodies, and must ensure that information requested is readily available. 27 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 Information provided must be accurate, precise and complete and in the format requested, including electronic format. On the basis of the audit findings, a ‘draft audit report’ will be drawn up. The Agency or the Commission will formally notify the draft audit report to the coordinator or beneficiary concerned, which has 30 days to formally notify observations (‘contradictory audit procedure’). This period may be extended by the Agency or the Commission in justified cases. The ‘final audit report’ will take into account observations by the coordinator or beneficiary concerned. The report will be formally notified to it. Audits (including audit reports) are in the language of the Agreement. The Agency or the Commission may also access the beneficiaries’ statutory records for the periodical assessment of flat-rate amounts. 17.2 Investigations by the European Anti-Fraud Office (OLAF) Under Regulations No 883/20137 and No 2185/968 (and in accordance with their provisions and procedures), the European Anti-Fraud Office (OLAF) may — at any moment during implementation of the action or afterwards — carry out investigations, including on-the-spot checks and inspections, to establish whether there has been fraud, corruption or any other illegal activity affecting the financial interests of the EU. 17.3 Checks and audits by the European Court of Auditors (ECA) Under Article 287 of the Treaty on the Functioning of the European Union (TFEU) and Article 161 of the Financial Regulation No 966/20129, the European Court of Auditors (ECA) may — at any moment during implementation of the action or afterwards — carry out audits. The ECA has the right of access for the purpose of checks and audits. 17.4 Checks, reviews, audits and investigations for international organisations Not applicable 17.5 Consequences of findings in checks, reviews, audits and investigations — Extension of findings 17.5.1 Findings in this grant 7 Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013 concerning investigations conducted by the European Anti-Fraud Office (OLAF) and repealing Regulation (EC) No 1073/1999 of the European Parliament and of the Council and Council Regulation (Euratom) No 1074/1999 (OJ L 232, 18.09.2013, p. 1). 8 Council Regulation (Euratom, EC) No 2185/1996 of 11 November 1996 concerning on-the-spot checks and inspections carried out by the Commission in order to protect the European Communities' financial interests against fraud and other irregularities (OJ L 292, 15.11.1996, p. 2). 9 Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing Council Regulation (EC, Euratom) No 1605/2002 (OJ L 298, 26.10.2012, p. 1). 28 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 Findings in checks, reviews, audits or investigations carried out in the context of this grant may lead to the rejection of ineligible costs (see Article 26), reduction of the grant (see Article 27), recovery of undue amounts (see Article 28) or to any of the other measures described in Chapter 6. Rejection of costs or reduction of the grant after the payment of the balance will lead to a revised final grant amount (see Article 5.4). Findings in checks, reviews, audits or investigations may lead to a request for amendment for the modification of Annex 1 (see Article 39). Checks, reviews, audits or investigations that find systemic or recurrent errors, irregularities, fraud or breach of obligations may also lead to consequences in other EU or Euratom grants awarded under similar conditions (‘extension of findings from this grant to other grants’). Moreover, findings arising from an OLAF investigation may lead to criminal prosecution under national law. 17.5.2 Findings in other grants The Agency or the Commission may extend findings from other grants to this grant (‘extension of findings from other grants to this grant’), if: (a) the beneficiary concerned is found, in other EU or Euratom grants awarded under similar conditions, to have committed systemic or recurrent errors, irregularities, fraud or breach of obligations that have a material impact on this grant and (b) those findings are formally notified to the beneficiary concerned — together with the list of grants affected by the findings — no later than five years after the payment of the balance of this grant. The extension of findings may lead to the rejection of costs (see Article 26), reduction of the grant (see Article 27), recovery of undue amounts (see Article 28), suspension of payments (see Article 32), suspension of the action implementation (see Article 33) or termination (see Article 34). 17.5.3 Procedure The Agency or the Commission will formally notify the beneficiary concerned the systemic or recurrent errors and its intention to extend these audit findings, together with the list of grants affected. 17.5.3.1 If the findings concern eligibility of costs: the formal notification will include: (a) an invitation to submit observations on the list of grants affected by the findings; (b) the request to submit revised financial statements for all grants affected; (c) the correction rate for extrapolation established by the Agency or the Commission on the basis of the systemic or recurrent errors, to calculate the amounts to be rejected, if the beneficiary concerned: (i) considers that the submission of revised financial statements is not possible or practicable or (ii) does not submit revised financial statements. 29 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 The beneficiary concerned has 90 days from receiving notification to submit observations, revised financial statements or to propose a duly substantiated alternative correction method. This period may be extended by the Agency or the Commission in justified cases. The Agency or the Commission may then start a rejection procedure in accordance with Article 26, either on the basis of the revised financial statements, the alternative method or the correction rate announced. 17.5.3.2 If the findings concern substantial errors, irregularities or fraud or serious breach of obligations: the formal notification will include: (a) an invitation to submit observations on the list of grants affected by the findings and (b) the flat-rate the Agency or the Commission intends to apply according to the principle of proportionality. The beneficiary concerned has 90 days from receiving notification to submit observations or to propose a duly substantiated alternative flat-rate. The Agency or the Commission may then start a reduction procedure in accordance with Article 27, either on the basis of the alternative flat-rate or the flat-rate announced. 17.6 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, any insufficiently substantiated costs will be ineligible (see Article 6) and will be rejected (see Article 26). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 18 — EVALUATION OF THE IMPACT OF THE ACTION 18.1 Right to evaluate the impact of the action The Agency or the Commission may carry out interim and final evaluations of the impact of the action measured against the objective of the EU programme. Evaluations may be started during implementation of the action and up to five years after the payment of the balance. The evaluation is considered to start on the date of the formal notification to the coordinator or beneficiaries. The Agency or the Commission may make these evaluations directly (using its own staff) or indirectly (using external bodies or persons it has authorised to do so). The coordinator or beneficiaries must provide any information relevant to evaluate the impact of the action, including information in electronic format. 18.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the Agency may apply the measures described in Chapter 6. 30 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 SECTION 3 OTHER RIGHTS AND OBLIGATIONS ARTICLE 19 — PRE-EXISTING RIGHTS AND OWNERSHIP OF THE RESULTS (INCLUDING INTELLECTUAL AND INDUSTRIAL PROPERTY RIGHTS) 19.1 Pre-existing rights and access rights to pre-existing rights Where industrial and intellectual property rights (including rights of third parties) exist prior to the Agreement, the beneficiaries must establish a list of these pre-existing industrial and intellectual property rights, specifying the owner and any persons that have a right of use. The coordinator must — before starting the action — submit this list to the Agency. Each beneficiary must give the other beneficiaries access to any pre-existing industrial and intellectual property rights needed for the implementation of the action and compliance with the obligations under the Agreement. 19.2 Ownership of results and rights of use The results of the action (including the reports and other documents relating to it) are owned by the beneficiaries. The beneficiaries must give the Agency and the Commission the right to use the results for their communication activities under Article 22. 19.3 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 27). Such a breach may also lead to any of the other measures described in Chapter 6. ARTICLE 20 — CONFLICT OF INTERESTS 20.1 Obligation to avoid a conflict of interests The beneficiaries must take all measures to prevent any situation where the impartial and objective implementation of the action is compromised for reasons involving economic interest, political or national affinity, family or emotional ties or any other shared interest (‘conflict of interests’). They must formally notify to the Agency without delay any situation constituting or likely to lead to a conflict of interests and immediately take all the necessary steps to rectify this situation. The Agency may verify that the measures taken are appropriate and may require additional measures to be taken by a specified deadline. 20.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 27) and the Agreement or participation of the beneficiary may be terminated (see Article 34). 31 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 21 — CONFIDENTIALITY 21.1 General obligation to maintain confidentiality During implementation of the action and for five years after the payment of the balance, the parties must keep confidential any data, documents or other material (in any form) that is identified as confidential at the time it is disclosed (‘confidential information’). They may use confidential information to implement the Agreement. The confidentiality obligations no longer apply if: (a) the disclosing party agrees to release the other party; (b) the information becomes generally and publicly available, without breaching any confidentiality obligation; (c) the disclosure of the confidential information is required by EU or national law. 21.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 27). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 22 — PROMOTING THE ACTION — VISIBILITY OF EU FUNDING 22.1 Communication activities by the beneficiaries 22.1.1 General obligation to promote the action and its results The beneficiaries must promote the action and its results. 22.1.2 Information on EU funding — Obligation and right to use the EU emblem Unless the Agency requests or agrees otherwise, any communication activity related to the action (including at conferences, seminars, in information material, such as brochures, leaflets, posters, presentations, etc., in electronic form, via social media, etc.) and any infrastructure, equipment or major results funded by the grant must: - display the EU emblem and - include the following text: “This [insert appropriate description, e.g. report, publication, conference, infrastructure, equipment, insert type of result, etc.] was funded by the European Union’s Health Programme (2014-2020).” When displayed in association with another logo, the EU emblem must have appropriate prominence. 32 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 For the purposes of their obligations under this Article, the beneficiaries may use the EU emblem without first obtaining approval from the Agency. This does not, however, give them the right to exclusive use. Moreover, they may not appropriate the EU emblem or any similar trademark or logo, either by registration or by any other means. 22.1.3 Disclaimer excluding Agency and Commission responsibility Any communication activity related to the action must indicate the following disclaimer: "The content of this [insert appropriate description, e.g. report, publication, conference, etc.] represents the views of the author only and is his/her sole responsibility; it cannot be considered to reflect the views of the European Commission and/or the Consumers, Health, Agriculture and Food Executive Agency (CHAFEA) or any other body of the European Union. The European Commission and the Agency do not accept any responsibility for use that may be made of the information it contains.” 22.2 Communication activities by the Agency and the Commission 22.2.1 Right to use the beneficiaries’ materials, documents or information The Agency and the Commission may use information relating to the action, documents notably summaries for publication and public deliverables as well as any other material, such as pictures or audio-visual material received from any beneficiary (including in electronic form). This does not change the confidentiality obligations in Article 21, which still apply. The right to use the beneficiary’s materials, documents and information includes: (a) use for its own purposes (in particular, making them available to persons working for the Agency, the Commission or any other EU institution, body, office or agency or body or institutions in EU Member States; and copying or reproducing them in whole or in part, in unlimited numbers); (b) distribution to the public (in particular, publication as hard copies and in electronic or digital format, publication on the internet, as a downloadable or non-downloadable file, broadcasting by any channel, public display or presentation, communicating through press information services, or inclusion in widely accessible databases or indexes); (c) editing or redrafting for communication and publicising activities (including shortening, summarising, inserting other elements (such as meta-data, legends, other graphic, visual, audio or text elements), extracting parts (e.g. audio or video files), dividing into parts, use in a compilation); (d) translation; (e) giving access in response to individual requests under Regulation No 1049/200110, without the right to reproduce or exploit; 10 Regulation (EC) No 1049/2001 of the European Parliament and of the Council of 30 May 2001 regarding public access to European Parliament, Council and Commission documents, OJ L 145, 31.5.2001, p. 43. 33 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 (f) storage in paper, electronic or other form; (g) archiving, in line with applicable document-management rules, and (h) the right to authorise third parties to act on its behalf or sub-license the modes of use set out in Points (b), (c), (d) and (f) to third parties if needed for the communication and publicising activities of the Agency or the Commission. If the right of use is subject to rights of a third party (including personnel of the beneficiary), the beneficiary must ensure that it complies with its obligations under this Agreement (in particular, by obtaining the necessary approval from the third parties concerned). Where applicable (and if provided by the beneficiaries), the Agency or the Commission will insert the following information: “© – [year] – [name of the copyright owner]. All rights reserved. Licensed to the Consumers, Health, Agriculture and Food Executive Agency (CHAFEA) and the European Union (EU) under conditions.” 22.3 Consequences of non-compliance If the beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 27). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 23 — PROCESSING OF PERSONAL DATA 23.1 Processing of personal data by the Agency and the Commission Any personal data under the Agreement will be processed by the Agency or the Commission under Regulation No 23/200111 and according to the ‘notifications of the processing operations’ to the Data Protection Officer (DPO) of the Agency or the Commission (publicly accessible in the DPO register). Such data will be processed by the ‘data controller’ of the Agency or the Commission, for the purposes of implementing, managing and monitoring the Agreement or protecting the financial interests of the EU or Euratom (including checks, reviews, audits and investigations; see Article 17). The persons whose personal data are processed have the right to access and correct their own personal data. For this purpose, they must send any queries about the processing of their personal data to the data controller, via the contact point indicated in the privacy statement(s) on the Agency and Commission websites. They also have the right to have recourse at any time to the European Data Protection Supervisor (EDPS). 23.2 Processing of personal data by the beneficiaries 11 Regulation (EC) No 45/2001 of the European Parliament and of the Council of 18 December 2000 on the protection of individuals with regard to the processing of personal data by the Community institutions and bodies and on the free movement of such data (OJ L 8, 12.01.2001, p. 1). 34 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 The beneficiaries must process personal data under the Agreement in compliance with applicable EU and national law on data protection (including authorisations or notification requirements). The beneficiaries may grant their personnel access only to data that is strictly necessary for implementing, managing and monitoring the Agreement. The beneficiaries must inform the personnel whose personal data are collected and processed by the Agency or the Commission. For this purpose, they must provide them with the privacy statement(s) (see above), before transmitting their data to the Agency or the Commission. 23.3 Consequences of non-compliance If a beneficiary breaches any of its obligations under Article 23.2, the Agency may apply any of the measures described in Chapter 6. ARTICLE 24 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE AGENCY The beneficiaries may not assign any of their claims for payment against the Agency to any third party, except if approved by the Agency on the basis of a reasoned, written request by the coordinator (on behalf of the beneficiary concerned). If the Agency has not accepted the assignment or the terms of it are not observed, the assignment will have no effect on it. In no circumstances will an assignment release the beneficiaries from their obligations towards the Agency. CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES ARTICLE 25 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES 25.1 Roles and responsibilities towards the Agency The beneficiaries have full responsibility for implementing the action and complying with the Agreement. The beneficiaries are jointly and severally liable for the technical implementation of the action as described in Annex 1. If a beneficiary fails to implement its part of the action, the other beneficiaries become responsible for implementing this part (without being entitled to any additional EU funding for doing so), unless the Agency expressly relieves them of this obligation. The financial responsibility of each beneficiary is governed by Articles 28, 29 and 30. 25.2 Internal division of roles and responsibilities The internal roles and responsibilities of the beneficiaries are divided as follows: (a) Each beneficiary must: 35 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 (i) keep information stored in the Participant Portal Beneficiary Register (via the electronic exchange system) up to date (see Article 12); (ii) inform the coordinator immediately of any events or circumstances likely to affect significantly or delay the implementation of the action (see Article 12); (iii) submit to the coordinator in good time: - individual financial statements for itself and, if required, certificates on the financial statements (see Article 15); - the data needed to draw up the technical reports (see Article 15); - any other documents or information required by the Agency or the Commission under the Agreement, unless the Agreement requires the beneficiary to submit this information directly. (b) The coordinator must: (i) monitor that the action is implemented properly (see Article 7); (ii) act as the intermediary for all communications between the beneficiaries and the Agency (in particular, providing the Agency with the information described in Article 12), unless the Agreement specifies otherwise; (iii) provide a pre-financing guarantee if requested by the Agency (see Article 16.2); (iv) request and review any documents or information required by the Agency and verify their completeness and correctness before passing them on to the Agency; (v) submit the deliverables and reports to the Agency (see Articles 14 and 15); (vi) ensure that all payments are made to the other beneficiaries without unjustified delay (see Article 16). The coordinator may not subcontract the above-mentioned tasks. 25.3 Internal arrangements between beneficiaries — Consortium agreement The beneficiaries must have internal arrangements regarding their operation and co-ordination to ensure that the action is implemented properly. These internal arrangements must be set out in a written ‘consortium agreement’ between the beneficiaries, which may cover: - internal organisation of the consortium; - management of access to the electronic exchange system; - distribution of EU funding; - additional rules on rights and obligations related to pre-existing rights and results (see Article 19); 36 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 - settlement of internal disputes; - liability, indemnification and confidentiality arrangements between the beneficiaries. The consortium agreement must not contain any provision contrary to the Agreement. CHAPTER 6 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY — SANCTIONS — DAMAGES — SUSPENSION — TERMINATION — FORCE MAJEURE SECTION 1 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY — SANCTIONS ARTICLE 26 — REJECTION OF INELIGIBLE COSTS 26.1 Conditions The Agency will — at the time of an interim payment, at the payment of the balance or afterwards — reject any costs which are ineligible (see Article 6), in particular following checks, reviews, audits or investigations (see Article 17). The rejection may also be based on the extension of findings from other grants to this grant (see Article 17.5.2). 26.2 Ineligible costs to be rejected — Calculation — Procedure Ineligible costs will be rejected in full. If the rejection of costs does not lead to a recovery (see Article 28), the Agency will formally notify the coordinator or beneficiary concerned of the rejection of costs, the amounts and the reasons why (if applicable, together with the notification of amounts due; see Article 16.5). The coordinator or beneficiary concerned may — within 30 days of receiving notification — formally notify the Agency of its disagreement and the reasons why. If the rejection of costs leads to a recovery, the Agency will follow the contradictory procedure with pre-information letter set out in Article 28. 26.3 Effects If the Agency rejects costs at the time of an interim payment or the payment of the balance, it will deduct them from the total eligible costs declared, for the action, in the periodic or final summary financial statement (see Article 15.3 and 15.4). It will then calculate the interim payment or payment of the balance as set out in Article 16.3 or 16.4. If the Agency — after an interim payment but before the payment of the balance — rejects costs declared in a periodic summary financial statement, it will deduct them from the costs declared in the next periodic summary financial statement or final summary financial statement. It will then calculate the interim payment or payment of the balance as set out in Article 16.3 or 16.4. If the Agency rejects costs after the payment of the balance, it will deduct the amount rejected from 37 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 the total eligible costs declared, by the beneficiary, in the final summary financial statement. It will then calculate the revised final grant amount as set out in Article 5.4. If the revised final grant amount is lower than the final grant amount, the Agency will recover the difference (see Article 28). ARTICLE 27 — REDUCTION OF THE GRANT 27.1 Conditions The Agency may — at the payment of the balance or afterwards — reduce the grant, if: (a) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed: (i) substantial errors, irregularities or fraud or (ii) serious breach of obligations under the Agreement or during the award procedure (including improper implementation of the action, submission of false information, failure to provide required information, breach of ethical principles) or (b) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (extension of findings from other grants to this grant; see Article 17.5.2). 27.2 Amount to be reduced — Calculation — Procedure The amount of the reduction will be proportionate to the seriousness of the errors, irregularities or fraud or breach of obligations. Before reduction of the grant, the Agency will formally notify a ‘pre-information letter’ to the coordinator or beneficiary concerned: - informing it of its intention to reduce the grant, the amount it intends to reduce and the reasons why and - inviting it to submit observations within 30 days of receiving notification. If the Agency does not receive any observations or decides to pursue reduction despite the observations it has received, it will formally notify confirmation of the reduction (if applicable, together with the notification of amounts due; see Article 16). 27.3 Effects If the Agency reduces the grant at the time of the payment of the balance, it will calculate the reduced grant amount for the action and then determine the amount due as payment of the balance (see Article 5.3.4 and 16.4). If the Agency reduces the grant after the payment of the balance, it will calculate the revised final grant amount for the action or for the beneficiary concerned (see Article 5.4). If the revised final grant amount is lower than the final grant amount, the Agency will recover the difference (see Article 28). 38 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 ARTICLE 28 — RECOVERY OF UNDUE AMOUNTS 28.1 Amount to be recovered — Calculation — Procedure The Agency will — at the payment of the balance or afterwards — claim back any amount that was paid but is not due under the Agreement. The coordinator is fully liable for repaying debts of the consortium (under the Agreement) even if it has not been the final recipient of those amounts. In addition, the beneficiaries (including the coordinator) are jointly and severally liable for repaying any unpaid debts under the Agreement (due by the consortium or any beneficiary, including late- payment interest) — up to the maximum EU contribution indicated, for each beneficiary, in the estimated budget (as last amended; see Annex 2). 28.1.1 Recovery at payment of the balance If the payment of the balance takes the form of a recovery (see Article 16.4), the Agency will formally notify a ‘pre-information letter’ to the coordinator: - informing it of its intention to recover, the amount due as the balance and the reasons why and - inviting the coordinator to submit observations within 30 days of receiving notification. If no observations are submitted or the Agency decides to pursue recovery despite the observations it has received, it will confirm the amount to be recovered and formally notify to the coordinator a debit note with the terms and the date for payment (together with the notification of amounts due; see Article 16.5). If payment is not made by the date specified in the debit note, the Agency or the Commission will recover the amount: (a) by ‘offsetting’ it — without the coordinator’s consent — against any amounts owed to the coordinator by the Agency, Commission or another executive agency (from the EU or Euratom budget). In exceptional circumstances, to safeguard the EU’s financial interests, the Agency may offset before the payment date specified in the debit note; (b) not applicable; (c) by holding the other beneficiaries jointly and severally liable — up to the maximum EU contribution indicated, for each beneficiary, in the estimated budget (as last amended; see Annex 2) (d) by taking legal action (see Article 41) or by adopting an enforceable decision under Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the Financial Regulation No 966/2012. If payment is not made by the date in the debit note, the amount to be recovered (see above) will be increased by late-payment interest at the rate set out in Article 16.11, from the day following the 39 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 payment date in the debit note, up to and including the date the Agency or the Commission receives full payment of the amount. Partial payments will be first credited against expenses, charges and late-payment interest and then against the principal. Bank charges incurred in the recovery process will be borne by the beneficiary, unless Directive 2007/64/EC applies. 28.1.2 Recovery of amounts after payment of the balance If — after the payment of the balance — the Agency revised the final grant amount for the action or for the beneficiary concerned (see Article 5.4), due to a rejection of costs or reduction of the grant, and the revised final grant amount is lower than the final grant amount (see Article 5.3), the Agency will: - if the rejection or reduction does not concern a specific beneficiary : claim back the difference from the coordinator (even if it has not been the final recipient of the amount in question) or - otherwise: claim back the difference from the beneficiary concerned. The Agency will formally notify a pre-information letter to the coordinator or beneficiary concerned: - informing it of its intention to recover, the amount to be repaid and the reasons why and - inviting it to submit observations within 30 days of receiving notification. If no observations are submitted or the Agency decides to pursue recovery despite the observations it has received, it will confirm the amount to be recovered and formally notify to the coordinator or beneficiary concerned a debit note. This note will also specify the terms and the date for payment. If payment is not made by the date specified in the debit note, the Agency or the Commission will recover the amount: (a) by ‘offsetting’ it — without the coordinator’s or beneficiary’s consent — against any amounts owed to the coordinator or beneficiary by the Agency, Commission or another executive agency (from the EU or Euratom budget). In exceptional circumstances, to safeguard the EU’s financial interests, the Agency may offset before the payment date specified in the debit note; (b) by holding the other beneficiaries jointly and severally liable, up to the maximum EU contribution indicated, for each beneficiary, in the estimated budget (as last amended; see Annex 2) (c) by taking legal action (see Article 41) or by adopting an enforceable decision under Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the Financial Regulation No 966/2012. If payment is not made by the date in the debit note, the amount to be recovered (see above) will be increased by late-payment interest at the rate set out in Article 16.11, from the day following the date 40 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 for payment in the debit note, up to and including the date the Agency or the Commission receives full payment of the amount. Partial payments will be first credited against expenses, charges and late-payment interest and then against the principal. Bank charges incurred in the recovery process will be borne by the beneficiary, unless Directive 2007/64/EC applies. ARTICLE 29 — ADMINISTRATIVE SANCTIONS In addition to contractual measures, the Agency or the Commission may also adopt administrative sanctions under Articles 106 and 131(4) of the Financial Regulation No 966/2012 (i.e. exclusion from future procurement contracts, grants and expert contracts and/or financial penalties). SECTION 2 LIABILITY FOR DAMAGES ARTICLE 30 — LIABILITY FOR DAMAGES 30.1 Liability of the Agency The Agency cannot be held liable for any damage caused to the beneficiaries or to third parties as a consequence of implementing the Agreement, including for gross negligence. The Agency cannot be held liable for any damage caused by any of the beneficiaries or third parties involved in the action, as a consequence of implementing the Agreement. 30.2 Liability of the beneficiaries Except in case of force majeure (see Article 35), the beneficiaries must compensate the Agency for any damage it sustains as a result of the implementation of the action or because the action was not implemented in full compliance with the Agreement. SECTION 3 SUSPENSION AND TERMINATION ARTICLE 31 — SUSPENSION OF PAYMENT DEADLINE 31.1 Conditions The Agency may — at any moment — suspend the payment deadline (see Article 16.2 to 16.4) if a request for payment (see Article 15) cannot be approved because: (a) it does not comply with the provisions of the Agreement (see Article 15); (b) the technical or financial report(s) have not been submitted or are not complete or additional information is needed, or (c) there is doubt about the eligibility of the costs declared in the financial statements and additional checks, reviews, audits or investigations are necessary. 41 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 31.2 Procedure The Agency will formally notify the coordinator of the suspension and the reasons why. The suspension will take effect the day notification is sent by the Agency (see Article 36). If the conditions for suspending the payment deadline are no longer met, the suspension will be lifted — and the remaining period will resume. If the suspension exceeds two months, the coordinator may request the Agency if the suspension will continue. If the payment deadline has been suspended due to the non-compliance of the technical or financial report(s) (see Article 15) and the revised report or statement is not submitted or was submitted but is also rejected, the Agency may also terminate the Agreement or the participation of the beneficiary (see Article 34.3.1(i)). ARTICLE 32 — SUSPENSION OF PAYMENTS 32.1 Conditions The Agency may — at any moment — suspend payments, in whole or in part for one or more beneficiaries, if: (a) a beneficiary (or a natural person who has the power to represent or take decision on its behalf) has committed or is suspected of having committed: (i) substantial errors, irregularities or fraud or (ii) serious breach of obligations under this Agreement or during the award procedure (including improper implementation of the action, submission of false information, failure to provide required information, breach of ethical principles) or (b) a beneficiary (or a natural person who has the power to represent or take decision on its behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (extension of findings from other grants to this grant; see Article 17.5.2). If payments are suspended for one or more beneficiaries, the Agency will make partial payment(s) for the part(s) not suspended. If suspension concerns the payment of the balance, the payment (or recovery) of the amount(s) concerned after suspension is lifted will be considered to be the payment that closes the action. 32.2 Procedure Before suspending payments, the Agency will formally notify the coordinator or beneficiary concerned: - informing it of its intention to suspend payments and the reasons why and - inviting it to submit observations within 30 days of receiving notification. 42 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 If the Agency does not receive observations or decides to pursue the procedure despite the observations it has received, it will formally notify confirmation of the suspension. Otherwise, it will formally notify that the suspension procedure is not continued. The suspension will take effect the day the confirmation notification is sent by the Agency. If the conditions for resuming payments are met, the suspension will be lifted. The Agency will formally notify the coordinator or beneficiary concerned. During the suspension, the periodic report(s) for all reporting periods except the last one (see Article 15.3) must not contain any individual financial statement(s) from the beneficiary concerned. The coordinator must include them in the next periodic report after the suspension is lifted or — if suspension is not lifted before the end of the action — in the last periodic report. The beneficiaries may suspend implementation of the action (see Article 33.1) or terminate the Agreement or the participation of the beneficiary concerned (see Article 34.1 and 34.2). ARTICLE 33 — SUSPENSION OF THE ACTION IMPLEMENTATION 33.1 Suspension of the action implementation, by the beneficiaries 33.1.1 Conditions The beneficiaries may suspend implementation of the action or any part of it, if exceptional circumstances — in particular force majeure (see Article 35) — make implementation impossible or excessively difficult. 33.1.2 Procedure The coordinator must immediately formally notify to the Agency the suspension (see Article 36), stating: - the reasons why and - the expected date of resumption. The suspension will take effect the day this notification is received by the Agency. Once circumstances allow for implementation to resume, the coordinator must immediately formally notify the Agency and request an amendment of the Agreement, to set the date on which the action will be resumed, extend the duration of the action and make other changes necessary to adapt the action to the new situation (see Article 39) — unless the Agreement or the participation of a beneficiary has been terminated (see Article 34). The suspension will be lifted with effect from the resumption date set out in the amendment. This date may be before the date on which the amendment enters into force. Costs incurred during suspension of the action implementation are not eligible (see Article 6). 33.2 Suspension of the action implementation, by the Agency 33.2.1 Conditions 43 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 The Agency may suspend implementation of the action or any part of it, if: (a) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed or is suspected of having committed: (i) substantial errors, irregularities or fraud or (ii) serious breach of obligations under this Agreement or during the award procedure (including improper implementation of the action, submission of false declaration, failure to provide required information, breach of ethical principles) or (b) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (extension of findings from other grants to this grant; see Article 17.5.2). 33.2.2 Procedure Before suspending implementation of the action, the Agency will formally notify the coordinator or beneficiary concerned: - informing it of its intention to suspend the implementation and the reasons why and - inviting it to submit observations within 30 days of receiving notification. If the Agency does not receive observations or decides to pursue the procedure despite the observations it has received, it will formally notify confirmation of the suspension. Otherwise, it will formally notify that the procedure is not continued. The suspension will take effect five days after confirmation notification is received (or on a later date specified in the notification). It will be lifted if the conditions for resuming implementation of the action are met. The coordinator or beneficiary concerned will be formally notified of the lifting and the Agreement will be amended, to set the date on which the action will be resumed, extend the duration of the action and make other changes necessary to adapt the action to the new situation (see Article 39) — unless the Agreement has already been terminated (see Article 34). The suspension will be lifted with effect from the resumption date set out in the amendment. This date may be before the date on which the amendment enters into force. Costs incurred during suspension are not eligible (see Article 6). The beneficiaries may not claim damages due to suspension by the Agency (see Article 30). Suspension of the action implementation does not affect the Agency’s right to terminate the Agreement or participation of a beneficiary (see Article 34), reduce the grant or recover amounts unduly paid (see Articles 27 and 28). 44 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 ARTICLE 34 — TERMINATION OF THE AGREEMENT OR OF THE PARTICIPATION OF ONE OR MORE BENEFICIARIES 34.1 Termination of the Agreement, by the beneficiaries 34.1.1 Conditions and procedure The beneficiaries may terminate the Agreement. The coordinator must formally notify termination to the Agency (see Article 36), stating: - the reasons why and - the date the termination will take effect. This date must be after the notification. If no reasons are given or if the Agency considers the reasons do not justify termination, the Agreement will be considered to have been ‘terminated improperly’. The termination will take effect on the day specified in the notification. 34.1.2 Effects The coordinator must — within 60 days from when termination takes effect — submit a periodic report (for the open reporting period until termination; see Article 15.3) and the final report (see Article 15.4). If the Agency does not receive the report(s) within the deadline (see above), only costs which are included in an approved periodic report will be taken into account. The Agency will calculate the final grant amount (see Article 5.3) and the balance (see Article 16.4) on the basis of the report(s) submitted. Only costs incurred until termination are eligible (see Article 6). Costs relating to contracts due for execution only after termination are not eligible. Improper termination may lead to a reduction of the grant (see Article 27). After termination, the beneficiaries’ obligations (in particular, Articles 15, 17, 18, 19, 20, 21, 22, 24, 26, 27 and 28) continue to apply. 34.2 Termination of the participation of one or more beneficiaries, by the beneficiaries 34.2.1 Conditions and procedure The participation of one or more beneficiaries may be terminated by the coordinator, on request of the beneficiary concerned or on behalf of the other beneficiaries. The coordinator must formally notify termination to the Agency (see Article 36) and inform the beneficiary concerned. If the coordinator’s participation is terminated without its agreement, the formal notification must be done by another beneficiary (acting on behalf of the other beneficiaries). The notification must include: - the reasons why; 45 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 - the opinion of the beneficiary concerned (or proof that this opinion has been requested in writing); - the date the termination takes effect. This date must be after the notification, and - a request for amendment (see Article 39), with a proposal for reallocation of the tasks and the estimated budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the addition of one or more new beneficiaries (see Article 40). If termination takes effect after the period set out in Article 3, no request for amendment must be included, unless the beneficiary concerned is the coordinator. In this case, the request for amendment must propose a new coordinator. If this information is not given or if the Agency considers that the reasons do not justify termination, the participation will be considered to have been terminated improperly. The termination will take effect on the day specified in the notification. 34.2.2 Effects The beneficiary concerned must submit to the coordinator: (i) a technical report and (ii) a financial statement covering the period from the end of the last reporting period to the date when termination takes effect. This information must be included by the coordinator in the periodic report for the next reporting period (see Article 15.3). If the request for amendment is rejected by the Agency (because it calls into question the decision awarding the grant or breaches the principle of equal treatment of applicants), the Agreement may be terminated according to Article 34.3.1(c). If the request for amendment is accepted by the Agency, the Agreement is amended to introduce the necessary changes (see Article 39). Improper termination may lead to a reduction of the grant (see Article 27) or termination of the Agreement (see Article 34). After termination, the concerned beneficiary’s obligations (in particular Articles 15, 17, 18, 19, 21, 22, 24, 26, 27 and 28) continue to apply. 34.3 Termination of the Agreement or of the participation of one or more beneficiaries, by the Agency 34.3.1 Conditions The Agency may terminate the Agreement or the participation of one or more beneficiaries, if: (a) one or more beneficiaries do not accede to the Agreement (see Article 40); (b) a change to their legal, financial, technical, organisational or ownership situation is likely to 46 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 substantially affect or delay the implementation of the action or calls into question the decision to award the grant; (c) following termination of participation for one or more beneficiaries (see above), the necessary changes to the Agreement would call into question the decision awarding the grant or breach the principle of equal treatment of applicants (see Article 39); (d) implementation of the action is prevented by force majeure (see Article 35) or suspended by the coordinator (see Article 33.1) and either: (i) resumption is impossible, or (ii) the necessary changes to the Agreement would call into question the decision awarding the grant or breach the principle of equal treatment of applicants; (e) a beneficiary is declared bankrupt, being wound up, having its affairs administered by the courts, has entered into an arrangement with creditors, has suspended business activities, or is subject to any other similar proceedings or procedures under national law; (f) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has been found guilty of professional misconduct, proven by any means; (g) a beneficiary does not comply with the applicable national law on taxes and social security; (h) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed fraud, corruption, or is involved in a criminal organisation, money laundering or any other illegal activity; (i) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed: (i) substantial errors, irregularities or fraud or (ii) serious breach of obligations under the Agreement or during the award procedure (including improper implementation of the action, submission of false information, failure to provide required information, breach of ethical principles); (j) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (extension of findings from other grants to this grant; see Article 17.5.2); (k) not applicable 34.3.2 Procedure Before terminating the Agreement or participation of one or more beneficiaries, the Agency will formally notify the coordinator or beneficiary concerned: - informing it of its intention to terminate and the reasons why and - inviting it, within 30 days of receiving notification, to submit observations and — in case of 47 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 Point (i.ii) above — to inform the Agency of the measures to ensure compliance with the obligations under the Agreement. If the Agency does not receive observations or decides to pursue the procedure despite the observations it has received, it will formally notify to the coordinator or beneficiary concerned confirmation of the termination and the date it will take effect. Otherwise, it will formally notify that the procedure is not continued. The termination will take effect: - for terminations under Points (b), (c), (e), (g), (i.ii) and (k) above: on the day specified in the notification of the confirmation (see above); - for terminations under Points (a), (d), (f), (h), (i.i) and (j) above: on the day after the notification of the confirmation is received. 34.3.3 Effects (a) for termination of the Agreement: The coordinator must — within 60 days from when termination takes effect — submit a periodic report (for the last open reporting period until termination; see Article 15.3) and a final report (see Article 15.4). If the Agreement is terminated for breach of the obligation to submit reports (see Articles 15.8 and 34.3.1(i)), the coordinator may not submit any reports after termination. If the Agency does not receive the report(s) within the deadline (see above), only costs which are included in an approved periodic report will be taken into account. The Agency will calculate the final grant amount (see Article 5.3) and the balance (see Article 16.4) on the basis of the report(s) submitted. Only costs incurred until termination takes effect are eligible (see Article 6). Costs relating to contracts due for execution only after termination are not eligible. This does not affect the Agency’s right to reduce the grant (see Article 27) or to impose administrative sanctions (Article 29). The beneficiaries may not claim damages due to termination by the Agency (see Article 30). After termination, the beneficiaries’ obligations (in particular Articles 15, 17, 18, 19, 21, 22, 24, 26, 27 and 28) continue to apply. (b) for termination of the participation of one or more beneficiaries: The coordinator must — within 60 days from when termination takes effect — submit a request for amendment (see Article 39), with a proposal for reallocation of the tasks and estimated budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the addition of one or more new beneficiaries (see Article 40). If termination is notified after the period set out in Article 3, no request for amendment must be submitted unless the beneficiary concerned is the coordinator. In this case the request for amendment must propose a new coordinator. The beneficiary concerned must submit to the coordinator: 48 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 (i) a technical report and (ii) a financial statement covering the period from the end of the last reporting period to the date when termination takes effect. This information must be included by the coordinator in periodic report for the next reporting period (see Article 15.3). If the request for amendment is rejected by the Agency (because it calls into question the decision awarding the grant or breaches the principle of equal treatment of applicants), the Agreement may be terminated according to Article 34.3.1(c). If the request for amendment is accepted by the Agency, the Agreement is amended to introduce the necessary changes (see Article 39). After termination, the concerned beneficiary’s obligations (in particular Articles 15, 17, 18, 19, 20, 21, 22, 24, 26, 27 and 28) continue to apply. SECTION 4 FORCE MAJEURE ARTICLE 35 — FORCE MAJEURE ‘Force majeure’ means any situation or event that: - prevents either party from fulfilling their obligations under the Agreement, - was unforeseeable, exceptional situation and beyond the parties’ control, - was not due to error or negligence on their part (or on the part of third parties involved in the action), and - proves to be inevitable in spite of exercising all due diligence. The following cannot be invoked as force majeure: - any default of a service, defect in equipment or material or delays in making them available, unless they stem directly from a relevant case of force majeure, - labour disputes or strikes, or - financial difficulties. Any situation constituting force majeure must be formally notified to the other party without delay, stating the nature, likely duration and foreseeable effects. The parties must immediately take all the necessary steps to limit any damage due to force majeure and do their best to resume implementation of the action as soon as possible. The party prevented by force majeure from fulfilling its obligations under the Agreement cannot be considered in breach of them. 49 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 CHAPTER 7 FINAL PROVISIONS ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES 36.1 Form and means of communication Communication under the Agreement (information, requests, submissions, 'formal notifications', etc.) must: - be made in writing and - bear the number of the Agreement. Until the payment of the balance: all communication must be made through the electronic exchange system and using the forms and templates provided there. After the payment of the balance: formal notifications must be made by registered post with proof of delivery (‘formal notification on paper’). Communications in the electronic exchange system must be made by persons authorised according to the Participant Portal Terms & Conditions. For naming the authorised persons, each beneficiary must have designated — before the signature of this Agreement — a ‘legal entity appointed representative (LEAR)’. The role and tasks of the LEAR are stipulated in his/her appointment letter (see Participant Portal Terms & Conditions). If the electronic exchange system is temporarily unavailable, instructions will be given on the Agency and Commission websites. 36.2 Date of communication Communications are considered to have been made when they are sent by the sending party (i.e. on the date and time they are sent through the electronic exchange system). Formal notifications through the electronic exchange system are considered to have been made when they are received by the receiving party (i.e. on the date and time of acceptance by the receiving party, as indicated by the time stamp). A formal notification that has not been accepted within 10 days after sending is considered to have been accepted. Formal notifications on paper sent by registered post with proof of delivery (only after the payment of the balance) are considered to have been made on either: - the delivery date registered by the postal service or - the deadline for collection at the post office. If the electronic exchange system is temporarily unavailable, the sending party cannot be considered in breach of its obligation to send a communication within a specified deadline. 36.3 Addresses for communication The electronic exchange system must be accessed via the following URL: 50 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/myarea/projects The Agency will formally notify the coordinator and beneficiaries in advance any changes to this URL. Formal notifications on paper (only after the payment of the balance) addressed to the Agency must be sent to the following address: Consumers, Health, Agriculture and Food Executive Agency (CHAFEA) Health and Food Safety Unit Health and Food Safety Unit Drosbach Building L-2920 Luxembourg Formal notifications on paper (only after the payment of the balance) addressed to the beneficiaries must be sent to their legal address as specified in the Participant Portal Beneficiary Register. ARTICLE 37 — INTERPRETATION OF THE AGREEMENT 37.1 Precedence of the Terms and Conditions over the Annexes The provisions in the Terms and Conditions of the Agreement take precedence over its Annexes. Annex 2 takes precedence over Annex 1. 37.2 Privileges and immunities Not applicable ARTICLE 38 — CALCULATION OF PERIODS, DATES AND DEADLINES In accordance with Regulation No 1182/7112, periods expressed in days, months or years are calculated from the moment the triggering event occurs. The day during which that event occurs is not considered as falling within the period. ARTICLE 39 — AMENDMENTS TO THE AGREEMENT 39.1 Conditions The Agreement may be amended, unless the amendment entails changes to the Agreement which would call into question the decision awarding the grant or breach the principle of equal treatment of applicants. Amendments may be requested by any of the parties. 39.2 Procedure The party requesting an amendment must submit a request for amendment signed in the electronic exchange system (see Article 36). 12 Regulation (EEC, Euratom) No 1182/71 of the Council of 3 June 1971 determining the rules applicable to periods, dates and time-limits (OJ L 124, 8/6/1971, p. 1). 51 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 The coordinator submits and receives requests for amendment on behalf of the beneficiaries (see Annex 3). If a change of coordinator is requested without its agreement, the submission must be done by another beneficiary (acting on behalf of the other beneficiaries). The request for amendment must include: - the reasons why; - the appropriate supporting documents, and - for a change of coordinator without its agreement: the opinion of the coordinator (or proof that this opinion has been requested in writing). The Agency may request additional information. If the party receiving the request agrees, it must sign the amendment in the electronic exchange system within 45 days of receiving notification (or any additional information the Agency has requested). If it does not agree, it must formally notify its disagreement within the same deadline. The deadline may be extended, if necessary for the assessment of the request. If no notification is received within the deadline, the request is considered to have been rejected. An amendment enters into force on the day of the signature of the receiving party. An amendment takes effect on the date agreed by the parties or, in the absence of such an agreement, on the date on which the amendment enters into force. ARTICLE 40 — ACCESSION TO THE AGREEMENT 40.1 Accession of the beneficiaries mentioned in the preamble The other beneficiaries must accede to the Agreement by signing the Accession Form (see Annex 3) in the electronic exchange system (see Article 36) within 30 days after its entry into force (see Article 42). They will assume the rights and obligations under the Agreement with effect from the date of its entry into force (see Article 42). If a beneficiary does not accede to the Agreement within the above deadline, the coordinator must — within 30 days — request an amendment to make any changes necessary to ensure proper implementation of the action. This does not affect the Agency's right to terminate the Agreement (see Article 34). 40.2 Addition of new beneficiaries In justified cases, the beneficiaries may request the addition of a new beneficiary. For this purpose, the coordinator must submit a request for amendment in accordance with Article 39. It must include an Accession Form (see Annex 3) signed by the new beneficiary in the electronic exchange system (see Article 36). 52 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 Associated with documentCHAFEA MGA — Multi:-v2.1 Ref. Ares(2021)1431961 23/02/2021 New beneficiaries must assume the rights and obligations under the Agreement with effect from the date of their accession specified in the Accession Form (see Annex 3). ARTICLE 41 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES 41.1 Applicable law The Agreement is governed by the applicable EU law, supplemented if necessary by the law of Belgium. 41.2 Dispute settlement If a dispute concerning the interpretation, application or validity of the Agreement cannot be settled amicably, the General Court — or, on appeal, the Court of Justice of the European Union — has sole jurisdiction. Such actions must be brought under Article 272 of the Treaty on the Functioning of the EU (TFEU). As an exception, if such a dispute is between the Agency and ‘UNIVERSITETET I SOROST- NORGE’, the competent Belgian courts have sole jurisdiction. If a dispute concerns administrative sanctions, offsetting or an enforceable decision under Article 79(2) of the Financial Regulation No 966/2012 and Article 299 TFEU (see Articles 28, 29 and 30), the beneficiaries must bring action before the General Court — or, on appeal, the Court of Justice of the European Union — under Article 263 TFEU. Actions against enforceable decisions must be brought against the Commission (not against the Agency). ARTICLE 42 — ENTRY INTO FORCE OF THE AGREEMENT The Agreement will enter into force on the day of signature by the Agency or the coordinator, depending on which is later. SIGNATURES For the coordinator For the Agency [--TGSMark#signature-999860675_75_210--] [--TGSMark#signature-service_75_210--] Béla Dr. Merkely with ECAS id n002coer signed in the Participant Signed by Veronique WASBAUER with ECAS id wasbave as an Portal on 26/02/2021 at 08:40:14 (transaction id SigId-80957-7Ai0Q authorised representative on 26-02-2021 11:47:24 (transaction id n11ok8blTrSisY2AnGrEs7NJiVsWWko3pWLQ7S14KLdFvua1jbEelKXF SigId-84113-IwPkNQ5F7lMFZKhNl5X5pgBwzzQBBsHISiuJHua9rzoYD 7mmaYHqBgwwJcAN1Gzc6cGrNO-rS0vSrmBGYCg3FMBs87Zim-zOB X1TNcWHMfSMoqolwzxaf3yPKdaPmx7uqe8vMu09e9i- Lpw9s6ZMJnUUkm6BsJKIpHiXOYHRyEX6WhDw9iczLzvCeNLicO0Ezs rS0vSrmBGYCg3FMBs87Zim-aFvyDg4xD40Es3L9HIAuDsAkh8pOT6R DY9uUCLd0OpzgI11dEhpFPPIiWk7cv). Timestamp by third party at 3GRZPPfzwsSgBTAl5fjMso3Z2EN7a80FcXjcJFrUwga08CiNYGmLheS) 2021.02.26 08:40:20 CET 2021.02.26 11:47:29 CET 53 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 EUROPEAN COMMISSION Consumers, Health, Agriculture and Food Executive Agency (CHAFEA) The Director ANNEX 1 (part A) Project NUMBER — 101018346 — TaSHI Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Table of Contents 1.1. The project summary................................................................................................................................. 3 1.2. The list of beneficiaries..............................................................................................................................4 1.3. Workplan Tables - Detailed implementation..............................................................................................5 1.3.1. WT1 List of work packages........................................................................................................... 5 1.3.2. WT2 List of deliverables................................................................................................................ 6 1.3.3. WT3 Work package descriptions................................................................................................... 8 Work package 1........................................................................................................................... 8 Work package 2......................................................................................................................... 10 Work package 3......................................................................................................................... 15 Work package 4......................................................................................................................... 19 Work package 5......................................................................................................................... 24 1.3.4. WT4 List of milestones................................................................................................................ 30 1.3.5. WT5 Critical Implementation risks and mitigation actions........................................................... 35 1.3.6 WT6 Summary of project effort in person-months........................................................................37 1.3.7. WT7 Tentative schedule of project reviews.................................................................................38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 1.1. The project summary Project Number 1 101018346 Project Acronym 2 TaSHI One form per project General information Project title 3 Empowering EU health policies on Task SHIfting Starting date 4 01/04/2021 Duration in months 5 36 Call (part) identifier 6 HP-PJ-2020-2 PJ-01-2020-3 Topic Support to reforms in health workforce field - Initiatives on task-shifting (Heading 1.2.1.1 of the AWP 2020) Fixed EC Keywords health workforce planning, health policy, optimizing care provision, skill-mix, digital Free keywords transformation, sustainable task shifting practices Abstract 7 Health workforce planning systems show a high variety of maturity in the EU. Member States tend to focus on diverse aspects of managing health workforces and health policy focuses on optimising the operation of health systems by various measures. Initiatives on task shifting can contribute to more effective organisation of care and human resources for health management at different levels, so committing to improve efficient and sustainable health systems in innovative ways.The main objectives of the TaSHI project are to provide a novel understanding and up- to-date knowledge on task shifting and on transferability and uptake of good practices in implementation. TaSHI applies different methods of analyses in order to provide added value on the concept, notion, and implementation of task shifting at EU-, national- and regional levels. TaSHI performs pilots at five implementation sites to gather evidence and data on the different types of task shifting (e.g. working time re-allocation, re-considered scope of practices in primary care, mental health care, radiology and ophthalmology, benefiting from telemedicine and digital health).TaSHI aims to facilitate dialogues and knowledge exchanges between the relevant stakeholders. Strengthening governance and stakeholder engagement for transferring and upscaling task shifting practices plays a crucial role in policy-making supporting health reforms for workforce development, as well as in enhancing cultural sensitivity, flexibility, readiness, and organizational adaptation to task shifting.TaSHI delivers a collection of good practices, useful tools and methods, a guidebook on task shifting supporting the real-life implementation, case studies on the pilots’ experiences, practical training materials and curriculum, and a set of recommendations. The deliverables on tangible solutions and practical products support EU MS at policy and organisational level to initiate and implement their own actions tailored to the local settings. Page 3 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 1.2. List of Beneficiaries Project Number 1 101018346 Project Acronym 2 TaSHI List of Beneficiaries Project Project No Name Short name Country entry exit month8 month 1 SEMMELWEIS EGYETEM SU Hungary 1 36 AGENZIA NAZIONALE PER I SERVIZI 2 AGE.NA.S Italy 1 36 SANITARI REGIONALI STICHTING NEDERLANDS INSTITUUT 3 VOOR ONDERZOEK VAN DE NIVEL Netherlands 1 36 GEZONDHEIDSZORG LIETUVOS RESPUBLIKOS SVEIKATOS 4 MOH-LT Lithuania 1 36 APSAUGOS MINISTERIJA 5 SOTSIAALMINISTEERIUM SM-EE Estonia 1 36 6 UNIVERSITETET I SOROST-NORGE USN Norway 1 36 ISTITUTO REGIONALE PER IL 7 SUPPORTOALLAE POLITICHE DELLA PoliS-Lombardia Italy 1 36 LOMBARDIA (POLIS-LOMBARDIA) Page 4 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 1.3. Workplan Tables - Detailed implementation 1.3.1. WT1 List of work packages WP Person- Start End WP Title Lead beneficiary10 Number9 months11 month12 month13 Project management and WP1 1 - SU 23.06 1 36 coordination of the project WP2 Dissemination and Communication 1 - SU 20.30 1 36 WP3 Evaluation 3 - NIVEL 10.20 1 36 Preparation - Knowledge WP4 6 - USN 20.78 4 30 management WP5 Implementation 2 - AGE.NA.S 40.71 4 36 Total 115.05 Page 5 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 1.3.2. WT2 list of deliverables Due Deliverable WP Dissemination Deliverable Title Lead beneficiary Type 15 Date (in Number14 number9 level16 months)17 Confidential, only for members of the consortium D1.1 Inception report WP1 1 - SU Report 3 (including the Commission Services) Dissemination and D2.1 WP2 1 - SU Report Public 3 communication plan Initial leaflet and roll- D2.2 WP2 1 - SU Report Public 3 up Websites, D2.3 Website WP2 1 - SU patents Public 3 filling, etc. Mid-term dissemination D2.4 and communication WP2 1 - SU Report Public 18 report Report on Stakeholder D2.5 management and event WP2 1 - SU Report Public 30 execution Dissemination and D2.6 WP2 1 - SU Report Public 36 communication report End of project booklet D2.7 WP2 1 - SU Report Public 36 for the public Confidential, Evaluation strategy only for members and plan: approaches, of the consortium D3.1 WP3 3 - NIVEL Report 3 materials, methods, (including the tools and requirements Commission Services) Mid-term evaluation D3.2 WP3 3 - NIVEL Report Public 18 report D3.3 Evaluation report WP3 3 - NIVEL Report Public 36 Collection of useful D4.1 tools and practices in WP4 6 - USN Report Public 6 task shifting Confidential, Pilot materials only for members of the practical of the consortium D4.2 WP4 6 - USN Report 15 training materials and (including the curriculum Commission Services) Practical training D4.3 materials and WP4 6 - USN Report Public 30 curriculum Page 6 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Due Deliverable WP Dissemination Deliverable Title Lead beneficiary Type15 Date (in Number14 number9 level16 months)17 Case studies of D5.1 WP5 2 - AGE.NA.S Report Public 20 implementation sites Guidebook of task D5.2 WP5 2 - AGE.NA.S Report Public 30 shifting Set of recommendations D5.3 WP5 2 - AGE.NA.S Report Public 36 for task shifting actions Page 7 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 1.3.3. WT3 Work package descriptions Work package number 9 WP1 Lead beneficiary 10 1 - SU Work package title Project management and coordination of the project Start month 1 End month 36 Objectives This WP of Project Management and Coordination executes the daily management of the TaSHI project and will provide overall planning, facilitate collaboration and follow up actions. The main objective is to achieve the goals set by the call and to design performance leading to a specific and successful outcome. Description of work and role of partners WP1 - Project management and coordination of the project [Months: 1-36] SU, AGE.NA.S, NIVEL, MOH-LT, SM-EE, USN, PoliS-Lombardia Description of work A detailed gantt chart involves the scheduled work of this WP, based on a monthly breakdown. This WP is responsible for delivering the milestones and deliverables of TaSHI on scheduled time to other WPs and to Chafea/EC. Besides monitoring reporting, this WP coordinates expansively the work of the partners, partners cooperations, follows deadlines in the project, and provides dispute resolution if necessary. WP1 is also responsible for the communication on behalf of the TaSHI Consortium with Chafea/EC. Planned actions in internal communication and documentation: -Creating a common mailing list to reach the operative members of each WP -Creating a common repository for the online work -Monthly electronic WP leader meetings -Bi- and multilateral meetings - on demand -Final meeting in Rome Communication towards Chafea/EC: -Audio/online progress meetings with Chafea/EC - one audio meeting per project year -Personal progress meetings, to be discussed Participation per Partner Partner number and short name WP1 effort 1 - SU 20.10 2 - AGE.NA.S 0.35 3 - NIVEL 0.35 4 - MOH-LT 0.78 5 - SM-EE 0.78 6 - USN 0.35 7 - PoliS-Lombardia 0.35 Total 23.06 Page 8 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 List of deliverables Due Deliverable Deliverable Title Lead beneficiary Type 15 Dissemination level 16 Date (in Number14 months)17 Confidential, only for members of the D1.1 Inception report 1 - SU Report consortium (including 3 the Commission Services) Description of deliverables D1 - Inception Report - This deliverable is a plan of actions and timeline for conducting the project and detailed explanation of the whole project work. (M3) D1.1 : Inception report [3] This deliverable is the a workplan of actions and timeline for conducting the project and detailed explanation of the whole project work. Details will be discussed and agreed in the Kick-off meeting (Milestone 1). Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) First official meeting with the project team, Chafea and the European Commission. Discussion about the MS1 Kick-off meeting 1 - SU 1 implementation of the project, agreement of the final workplan will be summarized in the Inception report D1. Draft Inception Report summarizes the TaSHI MS2 Draft Inception Report 1 - SU 2 workplan discussed and agreed at the Kick-off meeting. Draft Progess Report is the first draft summarizing the progess of workplan implemented by TaSHI during MS3 Draft Progress Report 1 - SU 17 the fist half of the project duration. Draft reports ensure keeping the timing planned for evaluation before delivery. Draft Final Report is the first draft summarizing the progess of workplan implemented by TaSHI during the whole MS4 Draft Final Report 1 - SU 34 project duration. Draft reports ensure keeping the timing planned for evaluation before delivery. Page 9 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Work package number 9 WP2 Lead beneficiary 10 1 - SU Work package title Dissemination and Communication Start month 1 End month 36 Objectives Well designed communication and dissemination strategy and plan have an important role in the whole duration of the project, as they strongly support the achievement of the general and specific objectives. WP2 contributes to provide all relevant information to the network of stakeholders, interested bodies and further beneficiaries. In this WP our primary goal is to have a complex, efficient dissemination activity reaching out to relevant networks in HWF development through a number of channels. We aim to provide them with up-to-date information based on a communication schedule designed in detail, at the same time provide platforms for interaction (e.g. at the specific “Health Workforce” forum). An essential part of this WP2 is to map the stakeholders and to engage them into an active community facilitating knowledge transfer and exchange of experiences and evidence. Given the significant proportion of online platforms and activities WP2 dissemination will reach all EU MS with a variety of communication channels, as well as facilitating policy dialogue and reaching the 27 Member States and beyond. Description of work and role of partners WP2 - Dissemination and Communication [Months: 1-36] SU, AGE.NA.S, NIVEL, MOH-LT, SM-EE, USN, PoliS-Lombardia The dissemination and communication activity involves a number of activities, such as creation of dissemination materials (e.g. leaflet, booklet), presentation of the TaSHI project and its activities in the various channels (e.g. website, newsletters), as well as controlling and regulating the consistency of presentation of all materials for the public about the TaSHI project. Step 1 - Preparation of the Communication and dissemination strategy and plan, setting up and designing the TaSHI dissemination (M1-M3) The first activities of the TaSHI project will focus on the preparation of the Communication and dissemination strategy and plan, which contains various elements. Design of the website, outlook of the newsletters, visual identity and dissemination materials (e.g. TaSHI project leaflet), templates will follow defined publicity guidelines with a house style and logo besides the mandatory elements. Figure 3 shows the logo proposals for the project. The WP leader has a possibility to run project websites under the university’s umbrella, therefore a long term availability is guaranteed. The WP leader is currently hosting the healthworkforce.eu website with the archive page of the Joint Action on European Health Workforce Planning and Forecasting. The TaSHI website can be linked to the abovementioned website, thereby ensuring a better visibility of the project. In addition, this would also ensure a long-term sustainability of the website. We are engaged to be active in the online space especially in the times of the COVID-19 pandemic, therefore we place a significant emphasis on our visibility utilizing the means provided by the internet. We aim to define the relevant target groups we want to reach and their preferred online communication channels and then we can create a more precise plan in order to engage the highest possible number of stakeholders. The Communication and dissemination strategy and plan will also list the TaSHI project deliverables and publishable materials on a timeline and plan their effective dissemination by target groups (e.g. the laymen report of the project or other WP deliverables). Among the objectives of the project, we emphasized the importance of sharing the experiences and practices, the potential aim for upscaling the pilot implementation experiences, therefore to provide a high visibility, accessibility and availability of the results and outputs are crucial. Step 2 - Activating channels for dissemination and communication (M3-M36) In the second phase of preparation of the Communication and dissemination strategy and plan, a stakeholder mapping and target audience identification will be applied. As described in the Stakeholders section in section 3 above, the main types of the stakeholders have been already identified, however a more detailed mapping by using the tool of stakeholder coverage evaluation from the “Toolkit on HWF planning ” - designed by the Joint Action on European Health Workforce Planning and Forecasting - will support this exercise. The dissemination and communication WP aims to engage stakeholders in order to increase the impact of the TaSHI project through the channels listed below. Seven different communication channels are planned to be utilized for dissemination (to be further specified in the Communication and dissemination strategy and plan). This activity also requires network management and animation, as well as online event planning. One of the main information sharing platforms will be the newly designed TaSHI project website. We will also include the websites of the Consortium partners in order to have a wider outreach to the relevant target groups. The presentation Page 10 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 of the TaSHI project will be strictly determined by the publicity guidelines. Partners will be asked to contribute to increased visibility, e.g. to post the selected messages on their websites, newsletters and social media platforms, publish short news/videos of the TaSHI project on the related websites, youtube channels, which will be also controlled and coordinated by WP2. We will set the optimal number of posts placed on the different channels keeping the balance of giving important and interesting information at the same time not overwhelming our target audience. TaSHI newsletters will be released every four month - in total nine editions during the project - in order to keep the stakeholders updated and active, and provide information sharing to a wider audience of subscribers. To disseminate actions of the partners of the consortium we will post brief articles in the partner’s newsletters. The content of the newsletters will be created and coordinated by the editorial team of WP2, following the pre-defined structure. TaSHI is planning to use the EU Health Policy Platform, where the WP leader is currently moderating the SEPEN designated group on “Health Workforce”. Management of virtual exchanges of the stakeholders through the EU Health Policy Platform, and the organisation of webinars and online policy dialogues would highly support the widespread visibility and accessibility of TaSHI outputs and results. On this platform, joint webinars with the other funded projects in the related topics could be executed. An event plan will be prepared on maximising the synergies of the parallel running projects. Personal appearance: Currently, the online appearance is preferred due to the travel restrictions caused by COVID-19. In the upcoming time, this situation might change, therefore we consider face-to-face events as well in our dissemination and communication WP. In case our partners will attend conferences/events in the duration of this project we would use the opportunity to spread the information about our work, use the opportunity of networking, attracting more experts and stakeholders of this field. At the same time personal meetings will give the opportunity to learn and gain new information, which could support the work of this partnership. Flyers and hand out materials will be provided by WP2 for personal meetings on demand. Step 3 - Interim evaluation (M15-M18) Since the TaSHI project runs for 36 months we intend to carry out an interim evaluation of dissemination and communication activities. We aim to carry out a quick satisfaction survey among the stakeholders engaged towards TaSHI (e.g. website visitors, newsletter subscribers, EU HPP webinar participants). This task will support the development of methods and tools utilized in the project. Participation per Partner Partner number and short name WP2 effort 1 - SU 18.54 2 - AGE.NA.S 0.21 3 - NIVEL 0.21 4 - MOH-LT 0.46 5 - SM-EE 0.46 6 - USN 0.21 7 - PoliS-Lombardia 0.21 Total 20.30 List of deliverables Due Deliverable Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in Number14 months)17 Dissemination and D2.1 1 - SU Report Public 3 communication plan D2.2 Initial leaflet and roll-up 1 - SU Report Public 3 Page 11 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 List of deliverables Due Deliverable Deliverable Title Lead beneficiary Type 15 Dissemination level 16 Date (in Number14 months)17 Websites, D2.3 Website 1 - SU patents Public 3 filling, etc. Mid-term dissemination D2.4 and communication 1 - SU Report Public 18 report Report on Stakeholder D2.5 management and event 1 - SU Report Public 30 execution Dissemination and D2.6 1 - SU Report Public 36 communication report End of project booklet D2.7 1 - SU Report Public 36 for the public Description of deliverables D2 - Dissemination and communication plan - This plan will include the design of the website, outlook of the newsletters, dissemination materials (e.g. TaSHI project leaflet), templates will follow defined publicity guidelines with a house style and logo besides the mandatory elements. (M3) D3 - Initial leaflet and roll-up - These printed materials will include the main information about the project and will support online and personal presentations.(M3) D4 - Website - The newly designed website will be one of the main information sharing platforms of the project. The website will be user friendly, nicely displayed and regularly updated. (M3) D5 - Mid -term dissemination and communication report - This report discusses the results of the interim evaluation and communication of TaSHI (Milestone 7). It summarizes experiences and changes in the plan - if necessary - for the second part of the project in terms of dissemination and communication activities. (M18) D6 - Report on Stakeholder management and event execution - In this report Milestone 8 (Draft report on Stakeholder management and event execution) will be updated and complemented including all the progress carried out by M30 D7 - Dissemination and communication report - Report summarising the achieved results of the communication and dissemination activities carried out during the project. It discusses the developemnt of work and updates information of deliverables prepared in WP2 (D2-D6). (M36) D8 - End of project booklet for the public - This deliverable will be a brief summary of the project achievements for the public (10 pages Laymen report) (M36) D2.1 : Dissemination and communication plan [3] This plan will include the publicity guideleines and visual identity of TaSHI (e.g. house style and logo, design of the website, outlook of the newsletters and of dissemination materials, templates, website draft, leaflet (D3-4). In addition, it will summarize the communication and dissemination plan including stakeholder/target audience map and channels tailored to various target audiences. D2.2 : Initial leaflet and roll-up [3] These printed materials will include the main information about the project and will support online and personal presentations. D2.3 : Website [3] The newly designed website will be one of the main information sharing platforms of the TaSHI project. The TaSHI website will be user friendly, nicely displayed and continuously updated during the whole project duration. D2.4 : Mid-term dissemination and communication report [18] Page 12 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 This report discusses the results of the interim evaluation and communication of TaSHI (Milestone 7). It summarizes experiences and changes in the plan - if necessary - for the second part of the project in terms of dissemination and communication activities. D2.5 : Report on Stakeholder management and event execution [30] This deliverable will summarize the communication and dissemination activities carried out continuously during M3-M30, including details on the dissemination products and stakeholder management: TaSHI website, TaSHI newsletters, Articles, short posts on EU HPP specific “Health Workforce” forum, Social media sites (linkedin, facebook, twitter), Partners websites and newsletters, Partners Youtube channels, Webinars/Joint webinars with related projects/online events, Rollup and leaflet, promotion material production. In this report Milestone 8 (Draft report on Stakeholder management and event execution in M5) will be updated and complemented including all the progress carried out by M30. D2.6 : Dissemination and communication report [36] Report summarising the achieved results of the communication and dissemination activities carried out during the project. It discusses the developemnt of work and updates information of deliverables prepared in WP2 (D2-D6). D2.7 : End of project booklet for the public [36] This deliverable will be a brief summary of the project achievements for the public (10 pages Laymen report). Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) Development of the visual identity refers to dissemination related materials such as project logo, templates for internal and public documents, Publicity guidelines, house MS5 1 - SU 3 leaflet and newsletter style and logo format, etc. All guidelines regarding dissemination and communication will be defined at the beginning of the project in order to design the project image. This plan will cover all aspects of the webinars, Webinar series, event events. The planned timing, MS6 1 - SU 4 execution plan invitation process, promotion/ publicity, execution and followup activities. In order to to improve all the communication and dissemination tools we will carry out an interim Interim evaluation evaluation survey between MS7 of dissemination and 1 - SU 18 month 15-18. Target audience communication of TaSHI of TaSHI will be asked to rate the quality and quantity of the information published on our communication channels. Page 13 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) This milestone refers to the first version of the Draft report on Stakeholder stakeholder analysis and the MS8 management and event 1 - SU 5 dissemination channels and execution networks, and refers to the plan of the webinars, events as well. Page 14 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Work package number 9 WP3 Lead beneficiary 10 3 - NIVEL Work package title Evaluation Start month 1 End month 36 Objectives Work Package 3 maintains two objectives: 1) to verify if the project is being implemented as planned and 2) to verify if the defined objectives are reached. Continuous improvement of the TaSHI project is the overarching goal. An evaluation strategy will be designed that is based on the methods for the evaluation, the indicators and measures of verification. The indicators are directly linked with the specific objectives, deliverables and milestones and explain how they will be measured. This WP will be executed in parallel with the project itself, while taking a position as an independent evaluator and counsellor within the consortium. Description of work and role of partners WP3 - Evaluation [Months: 1-36] NIVEL, SU, AGE.NA.S, MOH-LT, SM-EE, USN, PoliS-Lombardia Step 1 - Develop an evaluation strategy and plan (M1-M3) This Work Package concerns an ‘internal evaluation’, coordinated by Nivel that will conduct a systematic appraisal of the quality of the actions of the project. The Nivel team will be supported in its evaluation tasks by representatives from a number of relevant organisations that will be recruited for the ‘TaSHI Advisory Board’. Aimed members of this are already approached (with positive response from, among others, WHO Regional Office for Europe). The ‘TaSHI Advisory Board’ will consist of a minimum of five members from 5 different organisations. Involvement of health professional organizations into “TaSHI Advisory Board” ensures the strong connection with providers as well (e.g. European Hospital Federation, European Forum for Primary Care, European Patients’ Forum, European Federation of Nurses Associations, European Specialist Nurse Organisation, The Standing Committee of European Doctors, Council of European Dentists, Pharmaceutical Group of the European Union, etc.). The ‘Tashi Advisory Board’ will take into account a good representation of EU regions and countries along with the countries in the Consortium. They are invited to join two to three online meetings per year, depending on the planning of all projects deliverables and milestones. An evaluation strategy and plan will be developed directly at the start of the project and be delivered in M3. The plan will define when the project tasks are being delivered efficiently and effectively (in terms of processes and products) based on predefined indicators. This is to assess whether the aims of the project have been met but also how these have been achieved – and how this can be improved during the project. The plan will be aligned with all the deliverables of the Project (see section 8) and the milestone planned between these deliverables. The evaluation plan will provide an overview of: ● The specific objectives, deliverables and milestones to be evaluated (as described in the respective Work Packages); ● The indicators relevant to evaluate the objectives, deliverables and milestones (including the process, output and outcome indicators as defined in section 2); ● Data that is needed to feed these indicators, taking into account different data sources such as milestones, documents, reports, minutes, presentations, feedback reports, et cetera’ ● Ways the evaluation will be executed with the relevant consortium members and the support of “TaSHI Advisory Board” as external experts outside the consortium; ● Evaluation instruments applied, in terms of quality standards from an scientific perspective as well as assessment standards form a policy and practical perspective (due to the variation of the deliverables and milestones, there will be no standard format for assessment); ● Planning of the evaluation, as this WP will run along the total project and align with all the deliverables, milestones as well as the planned division of tasks and responsibilities between the Consortium partners; ● The risks, barriers and facilitators encountered during the project, and conclusions to be drawn; ● Ways the results of the evaluation are fed back to the responsible Work Package leaders and all other partners of the consortium. The evaluation plan needs to be agreed upon by all Consortium Members, including the quantitative and qualitative indicators that will be applied and used. As mentioned before, the list of deliverables and milestones as described in the respective Work Packages and section 8 in this proposal will be the starting point of the content of the evaluation and strategy plan. Step 2 - Executing of the evaluation plan (M3-36) Page 15 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 As it is pre-defined which partner is responsible for which deliverable and task, this/these person(s) will be the main subject to the evaluation as the milestone approaches (as planned and presented in section 8). I.e., the relevant partner is requested to submit the planned deliverable and milestone two to three weeks ahead of its deadline. This pre- deliverable/milestone will be reviewed by the Nivel team leading of this Work Packages, consulting the other consortium partners if necessary, and (if applicable or useful) the members from the “TaSHI Advisory Board”. The results from this consultation and review will be summarized and suggested changes will be discussed with the responsible Work Package leader(S). Next, the relevant partner will submit the adjusted deliverable, that will be re-evaluated by the Nivel team as leaders of this Work Package in order to consider it final and in adjustment of the deliverable/milestone deadline. A key evaluation task is to monitor, assure and support that the pre-defined deadlines of all the deliverables and milestones (as described in the WPs and section 8) are met. Next to this process evaluation, the key task is to evaluate the content of the deliverables and milestones, as outputs in itself, but also as outcomes in relation to the total project and its specific goals. Therefore, subject to this evaluation is that each deliverable and milestone of the WPs is aligned with each other and the process indicators as defined earlier in section 2 by the specific goals of the Project being: Ad 1: Added value at EU-, national- and regional levels ● Suggestion of changes in legal and policy environment to provide incentives to remove legal and other barriers to the recruitment and retention of healthcare workforce in underserved areas; ● Providing good practices for introduction of task-shifting – patient safety / HS performance; ● Providing recommendations on impact of new skills, including digital tools, disease prevention, risk detection; provide aid in the reskilling of HWF; as well as future HWF. Ad 2: New knowledge on task shifting processes ● Identification and analysis of the concept and implementation of task shifting; ● Providing an update on existing tools to incorporate task shifting processes; ● Mitigate the effects of changing skill-mixes and competencies – across sectors and occupational groups. Ad 3: Dissemination and exchange of knowledge on task shifting processes ● Implementing strategies and identifying best practices, facilitating the exchange of these concepts; ● Contribution to the EU HWF network, specific “Health Workforce” forum, dissemination of knowledge; ● Organizing seminars and thematic workshops to ensure joint reflection and enhancing knowledge and lessons learnt. Ad 4: Progress towards the implementation of task shifting processes for the HWF ● Development of practical guidelines for the public authorities and healthcare providers which will serve as operational tools supporting their healthcare workforce policies in relation to challenges in these fields; ● Provide practical training and education materials; ● Developing curricula for digital, interpersonal, and management skills for physicians, nurses, pharmacists, and other HWF; ● Provide recommendations for future HWF skills to aid better adaptation to new developments; provide aid in the upskilling of nurses, including digital skills, with the involvement of IT specialists. During its execution, the evaluation will analyse the backgrounds and reasons for any deviation from the deadline and/ or quality indicators applied. This is to act on any discrepancy or possible delay, and take ‘corrective measures’ into place when necessary. The monitoring of the compliance of the deliverables and milestones of this project, against the standards set in the quality checklists, will be communicated and discussed within the consortium during the evaluation meetings that will be planned. Due to the situation of COVID-19, the evaluation meetings will take place mostly online, and additionally face to face in combination with the consortium meetings that are already planned. The meetings will be planned, prepared and organised by the Nivel team, with the relevant Work Packages leader(s) responsible for the specific deliverables or milestones to be discussed. As mentioned above, the draft deliverables and milestones are requested by the evaluation team before two to three weeks ahead of the relevant deadline(s). Comments and feedback is provided in-text of the deliverables and milestones, and discussed in person during the meetings. Meeting records and minutes are being kept and exchanged for verification. These records are also exchanged with the Project Management Team. The (online) meetings with the “TaSHI Advisory Board” take place two to three times per year, discussing sets of deliverables and milestones in alignment with the Project planning. The Nivel team will plan, prepare and lead these meetings as well, including records and minutes taking. In each meeting of this Board, a member of the Project Management Team will participate, as well as one or two WP leaders relevant for the sets of deliverables and milestones at the agenda. Step 3 - Update of D7 with Sustainability plan M33 In addition to the evaluation strategy and plan, a sustainability plan will be included. This product will enable upscaling exercise in the EU and provide sustainability for task shifting implementations beyond the project timeframe. Special attention from the Evaluation WP 3 will be dedicated to the lessons learned from the Project, its planning, process and results. Page 16 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Participation per Partner Partner number and short name WP3 effort 1 - SU 0.78 2 - AGE.NA.S 0.35 3 - NIVEL 6.81 4 - MOH-LT 0.78 5 - SM-EE 0.78 6 - USN 0.35 7 - PoliS-Lombardia 0.35 Total 10.20 List of deliverables Due Deliverable Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in Number14 months)17 Confidential, only Evaluation strategy for members of the and plan: approaches, D3.1 3 - NIVEL Report consortium (including 3 materials, methods, tools the Commission and requirements Services) Mid-term evaluation D3.2 3 - NIVEL Report Public 18 report D3.3 Evaluation report 3 - NIVEL Report Public 36 Description of deliverables D9 - Evaluation strategy & plan: approaches, materials, methods, tools and requirements This deliverable will define when the project tasks are being delivered efficiently and effectively (in terms of processes and products) based on predefined indicators (M3). D10 - Mid-term evaluation report - This report will summarize the key findings in terms of the evaluation activities in the first half of the project. It summarizes experiences and changes in the plan - if necessary - for the second part of the project in terms of evaluation activities. (M18) D11 - Evaluation report - This report will summarize the key findings of the evaluation activities during the whole project, including sustainability plan (Milestone 10). (M36) D3.1 : Evaluation strategy and plan: approaches, materials, methods, tools and requirements [3] This deliverable will define when the project tasks are being delivered efficiently and effectively (in terms of processes and products) based on predefined indicators. D3.2 : Mid-term evaluation report [18] This report will summarize the key findings in terms of the evaluation activities in the first half of the project. It summarizes experiences and changes in the plan - if necessary - for the second part of the project in terms of evaluation activities. D3.3 : Evaluation report [36] This report will summarize the key findings of the evaluation activities during the whole project, including sustainability plan (Milestone 10). Page 17 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) This milestone is the first draft of the Evaluation strategy & plan including information on approaches, materials, methods, tools and requirements to be used First draft of Evaluation in WP3. This draft will list MS9 3 - NIVEL 2 strategy & plan and predefine indicators for efficient and effective delivery of products and processes for the whole duration of the project, as well as to define the "TaSHI Advisory Board". This Evaluation strategy & plan will be updated with information on the progress in WP3, including for example the efficient and effective delivery of products and processes, the outcomes of the activities of the "TaSHI Update of D9 with a Advisory Board". Based on MS10 3 - NIVEL 33 Sustainability plan the results and outcomes of TaSHI achieved duting the project duration, this updated report will attach a sustainability plan discussing the recommendations for the future, as well as the utilization of TaSHI in the future. Page 18 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Work package number 9 WP4 Lead beneficiary 10 6 - USN Work package title Preparation - Knowledge management Start month 4 End month 30 Objectives The main objective of WP4 is 1) to explore and map existing practices in task shifting, 2) to gather evidence on concepts and practice of implementation and 3) to develop a curriculum and training for task shifting, which are enabled particularly by digital skills for healthcare professionals. Description of work and role of partners WP4 - Preparation - Knowledge management [Months: 4-30] USN, SU, AGE.NA.S, NIVEL, PoliS-Lombardia Description of work Step 1 - Desk research: Collection of existing good practices in Task shifting (M3-M6) ● EU projects screening - exploring EU funded projects, concepts, tools and outcomes - grey literature ● Academic systematic literature review (e.g. books, research projects, guidelines, academic papers, survey, reports etc.) - inclusion criteria and exact keywords to be defined: geographic coverage EU-EEA, time of the last decade etc. ● Interviewing key informants in the frames of webinars or online thematic workshops, round tables - using WP2 webinars and networking events for focus-group interviews and stakeholder engagement These activities will address the current need for curriculum development as the impact of the rapid transformation of medicine and healthcare management. The emerging trends call for a change in education and types of training. These will address the following: 1) Interprofessional training and collaborative practice bringing a new approach to learning and sharing (integration and more committed HWF). 2) Acquiring transversal skills - upskilling and upscaling HWF (knowledge, skills and competency sharing), developing capabilities on digital health, leadership and management, good governance - assessment and evaluation. 3) Disruptive change and resiliency - technology & organizational adaptation, organizational reforms, supportive working environments and supportive organisational culture, leading to improved working conditions in the different levels of care) 4) Enhancing cultural sensitivity, flexibility and readiness - acquiring transversal skills (OECD 2018 ), flexibility for skill-mix, interprofessional teams and collaborative practice in the rapidly changing times, we can identify different levels of roles and responsibilities (health policy, organisational and individual) that facilitate avoiding of working in silos (attitude and behavioural). Mapping of existing practices will serve as an indicator of possible cultural differences and barriers on task shifting across MS. The notion of task shifting is a relatively new concept, therefore a thorough overview of the situation in all of the MS is needed to map the existing barriers or possible obstacles of the implementation of task shifting among HWF. Step 2 - Establishing education guidelines and developing practical training materials and curriculum (M6-M30) One of the key components of task shifting is identifying effective and efcient training methods for training para- professionals and upskilling the HWF. Indeed, a growing number of countries have initiated direct training strategies to facilitate task shifting processes. The so-called Just-In-Time Training method for example provides an effective strategy for the rapid upskilling of health professionals, by focusing on only the most necessary training and knowledge specific professionals are in need of for the carrying out of specific tasks, thereby facilitating task shifting options and competent service delivery (McQuillin et al., 2019 ). With this WP, we want to ensure that health professionals across the consortium are entitled to a coherent and quality- assured educational program, where they acquire competence and achieve the learning outcomes in digital skills. We want to ensure cohesive teaching and the use of digital learning-promoting forms of assessment that reinforce in-depth learning and critical thinking. The WP will lead to building new knowledge and further development of the professional environment where pedagogical and didactic issues will be addressed, which will be discussed and further developed. Page 19 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 The new training for task shifting will consist of modules which will cover and promote some of the transversal skills (OECD 2018 Feasibility Study on Health Workforce Skills Assessment) , cultural sensitivity, flexibility and readiness of the HWF: ● Ethics and professional standards - reflect on and deal with ethical issues in its service performance. ● Inclusion and equality - regardless of gender, ethnicity, religion and outlook on life, disability, sexual orientation, gender identity, gender expression and age, so that the candidate contributes to ensuring equal services for all groups in society. ● Communication and guidance skills that enable the candidate to understand and interact with users, patients and relatives. Furthermore, the curriculum will enable us to guide users, patients and relatives and relevant personnel who are in learning, mastering and changing processes. ● Interaction and interdisciplinary education - both interdisciplinary, interprofessional, cross-sectoral and across companies and levels, and initiate such interaction. ● Public health - to understand the connections between health, education, work and living conditions, and can apply this in their service, both to individuals and groups in society, to contribute to good public health and work inclusion. ● Knowledge-based practice - acquire new knowledge and make professional assessments, decisions and actions in line with knowledge-based practice. ● Innovation - knowledge of new thinking and innovation processes and contribution to service innovation and systematic and quality-improving work processes. ● Management and Leadership - learning to adapt the skills to lead effectively across geographies and culture, shared decision making and health system awareness, change management, and adaptive problem solving skills, and ● Digital expertise - providing digital competence and assistance in the development of and usage of suitable technology at both individual, organizational and system level. For the development and design of online education, we will use the “Knowledge, Process, Practice (KPP) model” . The model provides a concise map of how the educational features relate to each other and form a complete learning sequence; a module or a programme. We will carry out a systematic literature review of learning and assessment methods in online-education in healthcare which will feed into the three learning areas: knowledge, process and practice. Knowledge is suitable for self-directed online learning and self-assessment. Moreover, a systematic approach allows for blended learning. Formative assessment allows provision of links to additional learning (resource database) when required. Process takes the learner from assessment of existing and new knowledge to the application of knowledge in clinical practice. We will apply a specific professional cognitive process (cases) in the learning to facilitate scaffolding of new knowledge. Formative assessment will provide expert feedback and encourage further reflection when needed. Practice provides the opportunity to compare new knowledge with current professional practice. We will develop learning activities that generate opportunity for discussion. Participation per Partner Partner number and short name WP4 effort 1 - SU 7.73 2 - AGE.NA.S 2.06 3 - NIVEL 2.06 6 - USN 6.87 7 - PoliS-Lombardia 2.06 Total 20.78 Page 20 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 List of deliverables Due Deliverable Deliverable Title Lead beneficiary Type 15 Dissemination level 16 Date (in Number14 months)17 Collection of useful tools D4.1 and practices in task 6 - USN Report Public 6 shifting Confidential, only Pilot materials of for members of the D4.2 the practical training 6 - USN Report consortium (including 15 materials and curriculum the Commission Services) Practical training D4.3 6 - USN Report Public 30 materials and curriculum Description of deliverables D12 - Collection of useful tools and practices in task shifting - This deliverable will involve a desk research on: EU projects screening; academic systematic literature review; interviewing key informants in the frames of webinars or online thematic workshops. The report will build on Milestone 11-12. (M6) D13 - Pilot materials of the practical training materials and curriculum - Draft of the new training for task shifting (consisting of modules which will cover and promote some of the transversal skills, cultural sensitivity, flexibility and readiness of the HWF). This deliverable summarizes the draft curricula and training materials (Milestone 13 and 14). (M15) D14 - Practical training materials and curriculum - This new training for task shifting will consist of modules which will cover and promote some of the transversal skills, cultural sensitivity, flexibility and readiness of the HWF. This deliverable summarizes the draft curricula and training materials (Milestone 13 and 14 in M15), and incorporates the results and lessons of the pilot implementations (carried out by WP5). (M30) D4.1 : Collection of useful tools and practices in task shifting [6] This deliverable will involve a desk research on: EU projects screening; academic systematic literature review; interviewing key informants in the frames of webinars or online thematic workshops. The report will build on Milestone 11-12. D4.2 : Pilot materials of the practical training materials and curriculum [15] Draft of the new training for task shifting (consisting of modules which will cover and promote some of the transversal skills, cultural sensitivity, flexibility and readiness of the HWF). This deliverable summarizes the draft curricula and training materials (Milestone 13 and 14). D4.3 : Practical training materials and curriculum [30] This new training for task shifting will consist of modules which will cover and promote some of the transversal skills, cultural sensitivity, flexibility and readiness of the HWF. This deliverable summarizes the draft curricula and training materials (Milestone 13 and 14 in M15), and incorporates the results and lessons of the pilot implementations (carried out by WP5). Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) WP4 will carry out a desk Use of LOVU- methodology research to explore and map MS11 on how to collect evidence 6 - USN 4 existing practices in task and execute literature review shifting, and then establish education guidelines and Page 21 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) develop practical training materials and curriculum. The LOVU method enables in addition to the KPP educational model, a platform and repository of learning resources to apply to achieve specific learning outcomes. Findings of the desk research and the excercise of gathering evidence on concepts and practices will enable WP4 to prepare a collection of Findings of the desk research MS12 6 - USN 6 useful tools and materials. & analysing concepts Findings also serve as an input for M14, the practical training material that will be tested by WP5 during the pilot implementations. WP4 aims to develop a curriculum and training for task shifting, which are enabled particularly by digital skills for healthcare professionals. For the development and design Curricula digital (including of online education, the MS13 digital, interpersonal and 6 - USN 15 “Knowledge, Process, management skills) Practice (KPP) model” will be used. The model provides a concise map of how the educational features relate to each other and form a complete learning sequence; a module or a programme. Based on the previous milestones (M11, M12, M13), Developing pilot practical WP4 intends to develop MS14 6 - USN 15 training materials practical training materials to be utilized and tested in WP5 pilots. This milestone ensures that the experiences of all pilots are incorporated into Revised final version of the the training materials and MS15 practical training materials 6 - USN 30 curriculum on task shifting. and curriculum After realizing the pilot implementations coordinated by WP5, the experiences, Page 22 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) lessons learnt and conclusions will be included in D9. Page 23 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Work package number 9 WP5 Lead beneficiary 10 2 - AGE.NA.S Work package title Implementation Start month 4 End month 36 Objectives 1. Support implementers in a mix-match approach to blend objectives and activities related to core features from different task shifting tools and practices described by WP4. 2. Describe processes and results of the task shifting initiatives performed during the pilot exercise. 3. Support the exchange of knowledge and experiences of implementation by implementers including webinars and online thematic workshops. 4. Identify general principles and individual characteristics of successful implementation of task shifting initiatives in each pilot site. 5. Support the implementers to facilitate the sustainability of the practice by strategy and plans for actions at local/ regional/national level. 6. Generate set of recommendations and guidance for uptake of the pilot task shifting initiatives with new knowledge and understanding, based on the results of implementation. Description of work and role of partners WP5 - Implementation [Months: 4-36] AGE.NA.S, SU, NIVEL, MOH-LT, SM-EE, USN, PoliS-Lombardia The WP5 will manage the implementations of task shifting initiatives in 5 EU countries: Italy, The Netherlands, Norway, Lithuania, and Estonia. All of the implementation sites will involve health care providers, participating with a wide variety of processes and system features. The implementation activities stand for the carrying out of task shifting and task sharing processes on the five implementation sites. The pilot projects will focus on the implementation of some good practices selected by WP4, using the step-wise approach suggested by the Calderdale framework (Smith, R., & Duffy, J. Developing a competent and flexible workforce using the Calderdale Framework). The Calderdale is based on a system-wide approach, in which those seeking change engage with stakeholders, identify and draw on existing best practices, address governance issues, develop staffing and commit to sustainability. A common seven-step implementation strategy will be used in the 5 pilot sites. This seven-step methodology is inspired by the Calderdale Framework recommended for task shifting project implementation by the Expert Panel on effective ways of investing in Health (EXPH) of the EU Commission (2019 Task shifting and health system design). It has been defined to be appropriate from the scientific point of view, applicable considering data availability and feasible according to the project´s timeline and resources. The pilots do not intend to use the Calderdale tools. In addition, a common methodology on evaluating pilots will enable the Consortium to extract the experiences and findings of the 5 pilots into various deliverables on 1) Case studies of implementation sites, 2) Guidebook of task shifting, and 3) Set of recommendations for task shifting actions. When preparing the implementation plan, a common methodology sets out 7 phases. 1. Awareness raising phase The objective of this phase is to: ● describe the scope of intervention of the pilot project, identifying key actors at managerial level who can help to guide the implementation process and incorporate the process within the service/organisation; ● involve the stakeholders identified allowing them to reflect and identify the most appropriate areas to intervene with the framework; ● build and share the pilot project Action Plan with the identified stakeholders. Creating and sharing a vision of the pilot project with the stakeholders will help reduce confusion and anxiety among the staff involved about the process and potential changes. The Power Interest Matrix stakeholder analysis (Adapted from Mendelow, A.L. Environmental Scanning - The Impact of the Stakeholder Concept", ICIS 1981 Proceedings, 20 ) will be used to identify the stakeholders to be involved during this first phase. The Power Interest matrix, is a simple tool that helps categorize project stakeholders with increasing power and interest in the project. This tool helps to select and involve key stakeholders, who can implement or stop your project. In turn, this tool helps in defining stakeholder priorities. Implementing partners will perform this first phase by M4. 2. Service analysis Page 24 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 In this phase, implementers will have to describe the service object of the task shifting project, identifying "who does what" in the current setting, potential barriers to change and enablers. In this phase, potential ideas for change to meet patients' needs arising from the stakeholders involved will also be analysed taking into account the inputs provided by WP4. Implementing partners will perform this first phase from M5 to M6. 3. Task analysis At this stage, in each pilot project stakeholders will discuss and agree on the risks and mitigation of these risks when considering a different worker performing a specific job or function. A complete decision table will then be produced for each task/function indicating the risks and mitigations needed. Implementing partners will perform this first phase from M7 to M12. 4. Competency identification In this fourth phase, based on the analysis of the service (phase 2) of the tasks (phase 3), the implementers, together with their stakeholders, will identify a set of skills needed to deliver the service and the tasks analysed. For the activities foreseen in this phase, reference will be made to the competence framework proposed by the OECD (2018 Feasibility Study on Health Workforce Skills Assessment). The OECD conceptual framework proposes to analyse skills requirements in the health employment sector, including some proposed definitions of key terms. The concepts build on the OECD’s Program for International Assessment of Adult Competencies (PIAAC), which undertakes surveys of adult populations for their literacy skills understood as the interest, attitude and ability of individuals to appropriately use socio-cultural tools, including digital technology and communication tools, to access, manage, integrate and evaluate information, construct new knowledge, and communicate with others. Rather than defining the skills associated with particular categories of health workers, the OECD conceptual framework, by identifying the common functions and the skills associated with these functions by patient profiles, makes the process independent of the assignment of skills to any specific category of workers. Implementing partners will perform this first phase from M13 to M18. 5. Supporting systems To ensure that robust governance mechanisms are in place to support new ways of working and new roles, WP5 will at this stage analyse the governance systems in the pilot sites to support new ways of working and new roles. Implementing partners will perform this first phase from M15 to M18. 6. Training The objective of this phase is to ensure that all staff are trained in a manner appropriate to their role and the needs of patients It will be important at this stage to clarify the issues of accountability and accountability from both a clinical and governance perspective. WP4 will provide implementers with good practices to use to train staff involved in the task shifting initiative. Implementing partners will perform this first phase from M19 to M24. 7. Sustainability In this last phase, WP5, to ensure efficient use of the new roles, will assess the benefits of workforce development and manage the barriers to implementation at each pilot site. In addition, at each pilot site, in view of the sustainability of the system, forecasts of HWF needs will be updated, including in the existing HWF planning system in the implementing country the task shifting initiatives tested in the pilot project. Implementing partners will perform this first phase from M24 to M30. Brief description on pilots’ scopes Lithuania - HWF working time allocation pilot In order to solve the current challenges, Lithuania needs to free up time of the HWF towards direct service provision to the patients, granting higher share of service hours towards result-oriented activities. Due to the complexity of current practice routines there is no fact-based understanding of working hour consumption within primary care (GP and mental health) to free up time of health personnel by reducing wasted time slots or delegation of routine tasks to innovative eHealth solutions, or delegation of routine tasks towards lower skilled HWF with proper service quality control. Current policy making processes require regular assessment of HWF working time allocation during the working time, and the legal process in order to eliminate wasted time and provide a higher share of services. Having such a tool, processes in the national health care system would be able to provide higher hours of HWF service hours without increasing the burden to medical staff, without additional costs or high material investment and with improved job satisfaction of HWF, higher satisfaction of patients to actual increases of service provision time. In case of success of the project, it’s expected to eliminate at least 10% of HWF wasted working time and shifting at least 10% of working time towards technology or by enhancing the role of lower level specialist in service provisions. Overall improvement in 20% of service provisions at the country level will improve access to the quality health care Page 25 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 services and overall job satisfaction of HWF. The financial outcome and savings are not calculated, but this is obvious of 20% cost saving of the healthcare system. Estonia - Reconsidering work routines of different levels of care provision pilot There are at least two potential topics, where TaSHI project may have a direct impact on policy development during the project period: 1) Bringing mental health nurses from hospital level special care to primary care centres. Providing mental health care at a lower health care level might reduce pressure on psychiatric care and allows faster professional help for those in need of mental health care services. 2) Shifting tasks from radiologists and radiology nurses to radiographers. A brand new Master level program (https:// www.nooruse.ee/radiography) was opened as part of the collaboration of several medical schools of the Baltics, Finland and Ireland. Estonian legislation and work routines in hospitals need to be changed to allow the health system to fully use the acquired skills of the radiographers. On the other hand, Estonia has been a pioneer in developing e-health services, including task-shifting-to-digital solutions. Country’s experience – both success stories and negative practice – can offer lessons for other countries planning to shift tasks from health workers or patients to digital processes and solutions. Therefore, an experience sharing, knowledge transfer and expertise exchange can serve the objectives of the other implementation pilots in WP5, also add to the deliverables on tools and practices, and additionally it can contribute to the mapping exercise and education guide in WP4. Polis Lombardia - Increasing collaboration of health professions in primary care pilot The intention is to primarily focus on task-shifting between GPs, nurses, and social workers (and also digital task shifting), and to explore the possibility whether task-shifting can play a key-role in enhancing primary care services. Indeed, Polis-Lombardia is organizing an innovative training course for primary care nurses in collaboration with the regional government, and both local and national Orders of Nurses and Physicians. This course involves two classes of 25 alumni (both GPs and nurses) for 78 hours of frontal learning and 300 hours of internship (only for nurses). The main goals are to increase collaboration between nurses and GPs, to identify where task shifting is possible, and to enhance digital skills. After assessing and evaluating this course we aim to reach more than 3000 healthcare professionals per year in the Lombardy region. During the assessment and evaluation, we aim to gain better perspectives on task-shifting experiences in Lombardy and Italy, so plan to interview local and national professional associations’ coordinators as well. Based on the experience of the first edition of the course and the conclusions of the interviews, Polis Lombardia will implement the Calderdale framework and further methods and tools as proposed in WP4-WP5 in order to improve the next editions of training courses. Norway - Supportive telemedicine pilots In Norway, two pilot implementation topics are foreseen in the frame of the TaSHI project. One is focusing on video consultation in wound care and the other one on teleradiography with paramedic CT in rural areas. Both pilots are demonstrating the task shifting enabled by telemedicine/video consultation/digital solutions. The first pilot aims to introduce video consultation for patients and provide digital wound care. In order to initiate such a telemedicine project, upskilling the workforce with the necessary skills is the first priority. The pilot will elaborate the skill needs of the multidisciplinary teams in wound care clinics and design a curriculum and education guidance for managing video consultations. During the second pilot, we aim to gather experience of the multidisciplinary team on their skill needs and experiences of the tasks executed remotely. This practice will enable supporting early diagnosis of stroke in rural areas without the appropriate medical equipment. The Netherlands - Task shifting in the field of ophthalmology For the TaSHI project, regional projects, current practices in the Netherlands will be monitored in which ophthalmologists and optometrists collaborate. In one ongoing project in the region of Twente, ophthalmologists and optometrists work together in optics shops, causing that the number of referrals has decreased considerably. GPs tend to refer patients to optometrists instead of the ophthalmologists, thus the workload of the different professionals and patients pathway are modified. Also in the region of Rotterdam, cooperation and task shifting practices between ophthalmologists and optometrists can be monitored for the TaSHI project. Both regional projects provide an opportunity to explore the main features, advantages and obstacles in task-shifting practices. The collected information, data and experiences of these practices can contribute to better understanding of task-shifting between health professions. Participation per Partner Page 26 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Partner number and short name WP5 effort 1 - SU 3.09 2 - AGE.NA.S 6.18 3 - NIVEL 3.78 4 - MOH-LT 11.59 5 - SM-EE 8.51 6 - USN 3.78 7 - PoliS-Lombardia 3.78 Total 40.71 List of deliverables Due Deliverable Deliverable Title Lead beneficiary Type 15 Dissemination level 16 Date (in Number14 months)17 Case studies of D5.1 2 - AGE.NA.S Report Public 20 implementation sites Guidebook of task D5.2 2 - AGE.NA.S Report Public 30 shifting Set of recommendations D5.3 2 - AGE.NA.S Report Public 36 for task shifting actions Description of deliverables D15 - Case studies of implementation sites - The Consortium will extract the experiences and findings of the 5 pilots into various deliverables. One of these outputs will be the case studies of implementation sites. (M20) D16 - Guidebook of task shifting -This deliverable will summarize the guidelines and lessons learned based on the exercises carried out in this WP. In this guidebook the Consortium will involve the findings of the 5 pilot projects. (M30) D17 - Set of recommendations for task shifting actions - This deliverable will involve the good practices, results and conclusions gained through the execution of the pilot projects with the aim of strengthening the knowledge on task shifting. (M36) D5.1 : Case studies of implementation sites [20] The Consortium will extract the experiences and findings of the 5 pilots into various deliverables. One of these outputs will be the case studies of implementation sites. D5.2 : Guidebook of task shifting [30] This deliverable will summarize the guidelines and lessons learned based on the exercises carried out in this WP. In this guidebook the Consortium will involve the findings of the 5 pilot projects. D5.3 : Set of recommendations for task shifting actions [36] This deliverable will involve the good practices, results and conclusions gained through the execution of the pilot projects with the aim of strengthening the knowledge on task shifting. Page 27 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) The preparation of the "Needs analysis and implementation plan" will start in month 4 and is defined as a continuous activity in paralell to the first pahes of implementation, e.g., awareness raising, service Needs analysis and and task analysis. It will build MS16 2 - AGE.NA.S 12 implementation plan on the WP4 milestones and gather the evidence from the implementation sites. In the first year of the project (M1-M12), all essential input will be collected in order to conduct the pilots efficiently by the stepwise approach. The findings of the 5 pilot projects will be discussed and MS17 Implementation lessons 2 - AGE.NA.S 24 lessons from them will be concluded. This milestone aims to start drafting D11. The findings of the 5 pilot projects will be MS18 Implementation report 2 - AGE.NA.S 24 summarized and the content of the D11 guidebook will be prepared along the results of the 5 pilots. M19 is a continuing activity, which aims to synthesize the evidence gathered during Synthesizing evidence, the 5 implementation pilots. MS19 developing practical 2 - AGE.NA.S 29 In month 29, the milestone guidelines will result in the practical guidelines on task shifting, and these guidelines will be channeled into D11. M20 is a continuing activity, which aims to select good practices, methods and tools gathered during the 5 Selecting good practices, implementation pilots. In MS20 2 - AGE.NA.S 29 methods and tools month 29, the milestone will result in a collection of good practices, methods and tools on task shifting, which will be channeled into D11. This is the first draft of D12, MS21 Draft list of recommendation 2 - AGE.NA.S 32 a set of recommendations for task shifting actions based Page 28 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) on the results, conclusions, lessons and outcomes of the 5 implementation pilots. Page 29 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 1.3.4. WT4 List of milestones Due Milestone WP Milestone title Lead beneficiary Date (in Means of verification number18 number9 months)17 First official meeting with the project team, Chafea and the European Commission. Discussion about the MS1 Kick-off meeting WP1 1 - SU 1 implementation of the project, agreement of the final workplan will be summarized in the Inception report D1. Draft Inception Report summarizes the TaSHI MS2 Draft Inception Report WP1 1 - SU 2 workplan discussed and agreed at the Kick-off meeting. Draft Progess Report is the first draft summarizing the progess of workplan implemented by TaSHI MS3 Draft Progress Report WP1 1 - SU 17 during the fist half of the project duration. Draft reports ensure keeping the timing planned for evaluation before delivery. Draft Final Report is the first draft summarizing the progess of workplan implemented by TaSHI during the whole MS4 Draft Final Report WP1 1 - SU 34 project duration. Draft reports ensure keeping the timing planned for evaluation before delivery. Development of the visual identity refers to dissemination related materials such as project logo, templates for internal and public documents, Publicity guidelines, MS5 WP2 1 - SU 3 leaflet and newsletter house style and logo format, etc. All guidelines regarding dissemination and communication will be defined at the beginning of the project in order to design the project image. This plan will cover all aspects of the webinars, Webinar series, event events. The planned timing, MS6 WP2 1 - SU 4 execution plan invitation process, promotion/ publicity, execution and followup activities. Page 30 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Due Milestone WP Milestone title Lead beneficiary Date (in Means of verification number18 number9 months)17 In order to to improve all the communication and dissemination tools we Interim evaluation will carry out an interim of dissemination and evaluation survey between MS7 WP2 1 - SU 18 communication of month 15-18. Target audience TaSHI of TaSHI will be asked to rate the quality and quantity of the information published on our communication channels. This milestone refers to the first version of the Draft report on stakeholder analysis and the Stakeholder MS8 WP2 1 - SU 5 dissemination channels and management and event networks, and refers to the execution plan of the webinars, events as well. This milestone is the first draft of the Evaluation strategy & plan including information on approaches, materials, methods, tools and requirements to be used First draft of in WP3. This draft will list MS9 Evaluation strategy & WP3 3 - NIVEL 2 and predefine indicators plan for efficient and effective delivery of products and processes for the whole duration of the project, as well as to define the "TaSHI Advisory Board". This Evaluation strategy & plan will be updated with information on the progress in WP3, including for example the efficient and effective delivery of products and processes, the outcomes of the activities of the "TaSHI Update of D9 with a Advisory Board". Based on MS10 WP3 3 - NIVEL 33 Sustainability plan the results and outcomes of TaSHI achieved duting the project duration, this updated report will attach a sustainability plan discussing the recommendations for the future, as well as the utilization of TaSHI in the future. Use of LOVU- WP4 will carry out a desk MS11 methodology on how WP4 6 - USN 4 research to explore and map to collect evidence existing practices in task Page 31 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Due Milestone WP Milestone title Lead beneficiary Date (in Means of verification number18 number9 months)17 shifting, and then establish education guidelines and develop practical training materials and curriculum. and execute literature The LOVU method enables review in addition to the KPP educational model, a platform and repository of learning resources to apply to achieve specific learning outcomes. Findings of the desk research and the excercise of gathering evidence on concepts and practices will enable WP4 Findings of the desk to prepare a collection of MS12 research & analysing WP4 6 - USN 6 useful tools and materials. concepts Findings also serve as an input for M14, the practical training material that will be tested by WP5 during the pilot implementations. WP4 aims to develop a curriculum and training for task shifting, which are enabled particularly by digital skills for healthcare professionals. For the Curricula digital development and design (including digital, of online education, the MS13 WP4 6 - USN 15 interpersonal and “Knowledge, Process, management skills) Practice (KPP) model” will be used. The model provides a concise map of how the educational features relate to each other and form a complete learning sequence; a module or a programme. Based on the previous milestones (M11, M12, M13), Developing pilot WP4 intends to develop MS14 practical training WP4 6 - USN 15 practical training materials to materials be utilized and tested in WP5 pilots. This milestone ensures that the experiences of all Revised final version pilots are incorporated into of the practical the training materials and MS15 WP4 6 - USN 30 training materials and curriculum on task shifting. curriculum After realizing the pilot implementations coordinated by WP5, the experiences, Page 32 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Due Milestone WP Milestone title Lead beneficiary Date (in Means of verification number18 number9 months)17 lessons learnt and conclusions will be included in D9. The preparation of the "Needs analysis and implementation plan" will start in month 4 and is defined as a continuous activity in paralell to the first pahes of implementation, e.g., awareness raising, service Needs analysis and and task analysis. It will build MS16 WP5 2 - AGE.NA.S 12 implementation plan on the WP4 milestones and gather the evidence from the implementation sites. In the first year of the project (M1-M12), all essential input will be collected in order to conduct the pilots efficiently by the stepwise approach. The findings of the 5 pilot projects will be discussed and MS17 Implementation lessons WP5 2 - AGE.NA.S 24 lessons from them will be concluded. This milestone aims to start drafting D11. The findings of the 5 pilot projects will be MS18 Implementation report WP5 2 - AGE.NA.S 24 summarized and the content of the D11 guidebook will be prepared along the results of the 5 pilots. M19 is a continuing activity, which aims to synthesize the evidence gathered during Synthesizing evidence, the 5 implementation pilots. MS19 developing practical WP5 2 - AGE.NA.S 29 In month 29, the milestone guidelines will result in the practical guidelines on task shifting, and these guidelines will be channeled into D11. M20 is a continuing activity, which aims to select good practices, methods and tools gathered during the 5 Selecting good implementation pilots. In MS20 practices, methods and WP5 2 - AGE.NA.S 29 month 29, the milestone will tools result in a collection of good practices, methods and tools on task shifting, which will be channeled into D11. This is the first draft of D12, Draft list of MS21 WP5 2 - AGE.NA.S 32 a set of recommendations for recommendation task shifting actions based Page 33 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Due Milestone WP Milestone title Lead beneficiary Date (in Means of verification number18 number9 months)17 on the results, conclusions, lessons and outcomes of the 5 implementation pilots. Page 34 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 1.3.5. WT5 Critical Implementation risks and mitigation actions Risk Description of risk WP Number Proposed risk-mitigation measures number Strict control and monitoring of work schedule, intensive supervision on production of deliverables/milestones. Enable support for 1 Delays in project progress WP1 partners in case of need. Frequent reminders and regular WP leaders meeting supports time management. Milestones for draft reports and careful planning of deliverables and internal evaluation enable CHAFEA does not accept the 2 WP1 the consortium to produce good quality reports. periodic and final reports Continuous communication with Chafea/EC will aim to avoid misunderstandings on requirements. Continuous communication between WP2 and WP3; regular revision of target groups and Lack of reaching 3 WP2 communication channels work, utilisation of stakeholders the consortium networks from other European projects. Lack of professional content WP2 team continuously collects content from the 4 for the newsletter and WP2 other WPs, and the experts, stakeholders engaged. website Grounded decision on topics, focus on new Low participation in 5 WP2 emerging topics and crucial topics of HWF field; webinars/ online events adequate preparation and invitation process. Using and mobilising the extended personal Lack of reaching and network of the consortium, improve incentives 6 committing members of the WP3 for academics and researchers to participate ‘TaSHI Advisory Board’ by offering publication and presentation opportunities. Clear communication of the evaluation plan, its requirements and criteria, with all consortium Poor quality of the materials 7 WP3 members and WP leaders in particular. Prompt in evaluation feedback on the materials and deliverables to improve quality before publication. Clear communication of the evaluation plan, its requirements and deadlines, with all consortium Delays in delivering reports 8 WP3 members and WP leaders in particular. Prompt and materials for evaluation feedback and ‘early warning system’ for important publication and delivery deadlines. Together with the local partners, attempt to find lecturers and trainers who are known to be more Low interest of lecturers and positive and keen on teaching new methods. 9 WP4 trainers Benefits of participation in an internationally recognized team and project can be also emphasised. Re-analyse framework conditions (e.g. available Large difference in course infrastructure, digital support, etc.) and adjust 10 WP4 outcomes outcomes to identified system based differences, consider upscalability. Page 35 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Risk Description of risk WP Number Proposed risk-mitigation measures number WP4 will carry out desk research and explore different angles and perspectives of the available Lack of or too specific evidence: academic literature, EU project 11 methods, tools and practices WP4 reports, on-site experiences, key informant data. in task shifting Stakeholders can be approached in a targeted way, if specificity of task shifting practices need to be further explored. The stakeholder analysis performed with two goals: 1) in WP2 dissemination and 2) in WP5 pilots. Agile stakeholder management of a wide target audience as well as interactive dialogue in pilots enable improved stakeholder engagement. 12 Low stakeholder engagement WP5 Within the first step of the Calderdale framework implementation as well as the stakeholder involvement plan on the other 6 steps of the framework will mitigate the probability to have a low stakeholder involvement. The use of the Calderdale framework as Lack of or too specific stepwise approach to task shifting initiatives 13 WP5 priorities and goals for pilots implementations will assure to have an adequate action plan in each pilot site. Barriers and obstacles will be identified in the first step of the pilot studies together with Too many barriers and the identification of ways to overcome them. 14 obstacles to pilot task WP5 Governance mechanisms and sustainability shifting initiatives actions will be discussed and agreed in step 5 and 7 respectively. The HWF planning tools currently used by the 5 implementation countries are already known by the WP5 leader from previous projects study (see SEPEN and Joint Action on European Health No progress on updating 15 WP5 Workforce Planning and Forecasting). This HWF planning tools knowledge enables the WP5 leader to anticipate the potential changes needed to include the task shifting initiatives into the specific HWF planning tools of each implementer. Not adequately addressing Assuming prevalence of the risk and taking cultural differences upon deliberate actions to prevent such outcomes. If 16 providing education WP4 necessary, control the risk by taking adequate guidelines and developing measures to minimize or eliminate its impact. practical training materials. There is an uncertanity in organising personal meeting as planned. In case of travels In case of travelling restrictions, meetings will be 17 WP1 are officially not allowed, organised online. Travel budget will be revised. travel plans need to be revised. Page 36 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 1.3.6. WT6 Summary of project effort in person-months WP1 WP2 WP3 WP4 WP5 Total Person/Months per Participant 1 - SU 20.10 18.54 0.78 7.73 3.09 50.24 2 - AGE.NA.S 0.35 0.21 0.35 2.06 6.18 9.15 3 - NIVEL 0.35 0.21 6.81 2.06 3.78 13.21 4 - MOH-LT 0.78 0.46 0.78 0 11.59 13.61 5 - SM-EE 0.78 0.46 0.78 0 8.51 10.53 6 - USN 0.35 0.21 0.35 6.87 3.78 11.56 7 - PoliS-Lombardia 0.35 0.21 0.35 2.06 3.78 6.75 Total Person/Months 23.06 20.30 10.20 20.78 40.71 115.05 Page 37 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 1.3.7. WT7 Tentative schedule of project reviews No project reviews indicated Page 38 of 38 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 1. Project number The project number has been assigned by the Commission as the unique identifier for your project. It cannot be changed. The project number should appear on each page of the grant agreement preparation documents (part A and part B) to prevent errors during its handling. 2. Project acronym Use the project acronym as given in the submitted proposal. It can generally not be changed. The same acronym should appear on each page of the grant agreement preparation documents (part A and part B) to prevent errors during its handling. 3. Project title Use the title (preferably no longer than 200 characters) as indicated in the submitted proposal. Minor corrections are possible if agreed during the preparation of the grant agreement. 4. Starting date Unless a specific (fixed) starting date is duly justified and agreed upon during the preparation of the Grant Agreement, the project will start on the first day of the month following the entry into force of the Grant Agreement (NB : entry into force = signature by the Agency). Please note that if a fixed starting date is used, you will be required to provide a written justification. 5. Duration Insert the duration of the project in full months. 6. Call (part) identifier The Call (part) identifier is the reference number given in the call or part of the call you were addressing, as indicated in the publication of the call in the Official Journal of the European Union. You have to use the identifier given by the Commission in the letter inviting to prepare the grant agreement. 7. Abstract 8. Project Entry Month The month at which the participant joined the consortium, month 1 marking the start date of the project, and all other start dates being relative to this start date. 9. Work Package number Work package number: WP1, WP2, WP3, ..., WPn 10. Lead beneficiary This must be one of the beneficiaries in the grant (not a third party) - Number of the beneficiary leading the work in this work package 11. Person-months per work package The total number of person-months allocated to each work package. 12. Start month Relative start date for the work in the specific work packages, month 1 marking the start date of the project, and all other start dates being relative to this start date. 13. End month Relative end date, month 1 marking the start date of the project, and all end dates being relative to this start date. 14. Deliverable number Deliverable numbers: D1 - Dn 15. Type Please indicate the type of the deliverable using one of the following codes: R Document, report DEM Demonstrator, pilot, prototype DEC Websites, patent fillings, videos, etc. OTHER ETHICS Ethics requirement ORDP Open Research Data Pilot DATA data sets, microdata, etc. Associated with document Ref. Ares(2021)1431961 - 23/02/2021 16. Dissemination level Please indicate the dissemination level using one of the following codes: PU Public CO Confidential, only for members of the consortium (including the Commission Services) EU-RES Classified Information: RESTREINT UE (Commission Decision 2005/444/EC) EU-CON Classified Information: CONFIDENTIEL UE (Commission Decision 2005/444/EC) EU-SEC Classified Information: SECRET UE (Commission Decision 2005/444/EC) 17. Delivery date for Deliverable Month in which the deliverables will be available, month 1 marking the start date of the project, and all delivery dates being relative to this start date. 18. Milestone number Milestone number:MS1, MS2, ..., MSn 19. Review number Review number: RV1, RV2, ..., RVn 20. Installation Number Number progressively the installations of a same infrastructure. An installation is a part of an infrastructure that could be used independently from the rest. 21. Installation country Code of the country where the installation is located or IO if the access provider (the beneficiary or linked third party) is an international organization, an ERIC or a similar legal entity. 22. Type of access TA-uc if trans-national access with access costs declared on the basis of unit cost, TA-ac if trans-national access with access costs declared as actual costs, and TA-cb if trans-national access with access costs declared as a combination of actual costs and costs on the basis of unit cost, VA-uc if virtual access with access costs declared on the basis of unit cost, VA-ac if virtual access with access costs declared as actual costs, and VA-cb if virtual access with access costs declared as a combination of actual costs and costs on the basis of unit cost. 23. Access costs Cost of the access provided under the project. For virtual access fill only the second column. For trans-national access fill one of the two columns or both according to the way access costs are declared. Trans-national access costs on the basis of unit cost will result from the unit cost by the quantity of access to be provided. TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Annex 1 to the Grant Agreement (Empowering EU health policies on Task SHIfting) Chafea – 3rd Health Programme Multi-beneficiary Project Grant (HP-PJ, HP-JA) TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 2. PART B History of changes Remark Response Change “However, impact of these TaSHI consortium considers Additional lines were inserted activities to the challenge of some points of the proposal into the proposal to better task shifting at panEuropean that already provide some clarify the EU level level might not be high.” information, how we plan to foster the uptake of the pilot - general objectives implementations and facilitate - specific objectives the exchange at EU level. We - context of the project “There is a risk that added value work at EU level in the field of public put the emphasis of transferability highlighted in - expected outcomes health will be limited to our proposal at several and benefits of the participant countries. The project project fulfils the requirement sections, e.g. at the “Added value” section. All the sections - WP2 and WP3 of geographical coverage, but description on very little beyond as there is were revised and completed. stakeholder nothing in the approach or management and the method that by design takes “TaSHI Advisory Board” the project (or its learnings) outside the partner countries. However there is mention of European wide dissemination in the WP3 evaluation plan with little detail provided.” “One important aspect of Our proposal pointed out some A paragraph on change change management in this aspects of cultural sensitivity management was inserted to area is differences in cultural already, because it has crucial the section of “Context of contexts. Task-shifting has importance in managing WPs”. In addition, WP different barriers, and one of change. The mapping exercise descriptions contain further the more prominent are planned in WP4 will contribute details. probably the tradition and to reveal the significance of this culture of different barrier as well. Taking cultural professional roles in each context and sensitivity in health system. There is no account is an essential part of discussion of this.” the project as we aim to increase HWF responsiveness and resiliency. Important mission of TaSHI is to improve cultural sensitivity and openness of HWF to more effective organisation of work and developed working environments (e.g. multiprofessional teamwork, interprofessional education, collaborative practice etc.). The 1 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 mapping exercise and training modules will also deal with the cultural sensitivity. By providing clear guidelines on implementation of task shifting, and the targeted training modules, the various outcomes of the project can also serve as solutions for such cultural differences and barriers. “Problem analysis Including The proposal highlights We added information on evidence base contains a very different solutions and aspects previous project experiences thorough review of literature from already existing literature (e.g. SEPEN tender) to the and the concept of task- on how the emerging problems introduction and to the context sharing. However, it can be and challenges can be of the project work. considered more a literature mitigated by the various Implementation pilots were review of the concept than a processes of task shifting, more thoroughly described. problem identification and sharing and skill-mixes. analysis. It includes important Previous projects concerning aspect (e.g. the distinction task- system challenges have already SHARING, co-creation by underlined the benefits of patients, digitalisation, etc.), digital health solutions in but does not link it clearly to healthcare management and which problem it can solve, organization (e.g. SEPEN only implicitly links it to HR mapping study, SEPEN challenges”. workshop 5 outcomes, WHO recommendations on digital health). “The project appears a bit too The overall knowledge sharing A paragraphs and some ambitious in its intent to can serve a wide variety of explanation were inserted to address a wide variety of task settings, outlines, and solutions the section of “Context of shifting challenges in different for task shifting. Exchanging WPs”. settings and on different good practices, case studies, healthcare issues, by providing methods and tools can be guidelines, curricula and beneficial for EU MS, as they pilots.” can learn the latest information and evidence and can utilize them by adjusting to their own needs. TaSHI aims to provide and support the continuous dialogue on the issue by various communication channels and dissemination products and activities (newsletters, webinars, dialogue on the EU HPP “Health Workforce” forum), and facilitate co- creation of different actors. Training and education 2 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 materials are useful in curriculum development of any level or type of training programmes. TaSHI aims to provide a deliverable that benefits upskilling and upscaling the HWF and enable and foster capacity building as well. “A more thorough description With regards to the Calderdale Some changes were made in of the Calderdale framework Framework, the proposal refers the methods section as well as would have been beneficial, as to the EU study on “Task the respective WP descriptions. it would provide an Shifting and Health System understanding of whether the Design” (2019) and declares a applicant's team has step-wise approach suggested Particularly in WP4, we listed understood it and has a plan of by the Framework. TaSHI the means and methods to be how to apply it.” outlines the intended use of a used during the different 7-step approach in detail, and activities, e.g. Use of LOVU- the possible steps of methodology or the “For WP4, the section 7.1 implementation without the “Knowledge, Process, Practice Overview of Work Packages usage of the Calderdale tools. (KPP) model”. In addition, WP5 (WPs) does not add enough TaSHI intends to carry out includes a description of the methodological description.” different pilot implementations Calderdale Framework set by a common framework stepwise approach to be used and a stepwise approach by the implementation pilots. inspired by the Calderdale Further descriptions on these framework. methods were added directly to the proposal text. More extended methodological description was inserted in the “Methods and means” section. “For WP5, it is not clear from The implementation stands for No changes, since the 7 phases the proposal if implementation the carrying out of task shifting of implementation - covering means following task-sharing and task sharing processes on phases of design through the given implementation sites. situation analysis (e.g. on the five "implementation Implementation means actually awareness raising, service and sites", or actually designing and designing and implementing task analysis) and phases of implementing task-shifting task-shifting pilot projects by executing the concrete actions projects.” using a stepwise approach. (e.g. competency identification, supporting systems, training and sustaining) at the implementation sites – are described in WP5. “Some of the concepts The TaSHI consortium has been Few lines were added to the proposed have clear innovative highly involved in EU level Specific objectives and Means nature and have been activities focussing on various and methods highlighting the 3 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 successfully implemented in angles of HWF issues in the last new tools and the novelty of some partner countries. decades. Therefore, all the expected solutions. Technical complementarity is evolution of the HWF field, Deliverables and milestones present, but there is a risk that including strategies for more were also revised and slightly the collaboration will limit effective care provision and reformulated accordingly. experience sharing, not HRH management and planning creation of something new.” are widely known. Improvements and action plans in the field of strategic HWF management and planning might take time but information exchange and knowledge sharing always plays a facilitator role. The TaSHI consortium intends to continue the exchanges and collaboration of various stakeholders in the policy dialogue on HWF development. The EU study on “Task Shifting and Health System Design” 2019 also highlights conclusions and recommendations on task shifting, which have been considered during the preparation of the TaSHI proposal. “The WP3 evaluation approach All of the EU MS will The description of the “TaSHI is very general. This is however continuously be kept informed Advisory Board” was extended mitigated to some extent in the through our existing networks, in the proposal text. WP description section.” a particular attention could be dedicated to the “TaSHI Advisory Board” set by WP3 for evaluation, which members play a crucial role of key actors, informants at the international level. This international “TaSHI Advisory Board” will be installed within WP3, that will take into account a good representation of EU regions and countries next to the countries in the Consortium, and additionally will ensure to engage the target audience of healthcare providers via the involvement of health professional organizations. 4 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 “The dissemination strategy The EU-wide dissemination of Some examples form the pilot and plan includes different knowledge is covered as part of sites were added to the context channels of communication WP2 Dissemination and of implementation sites. with no particular focus on Communication. Stakeholder different target audiences and analysis and management is various stakeholders” part of the activities of WP2. Section 5 Methods and means details the table of different communications channels, purpose, frequency, method and duration of the communication that is foreseen. “The proposal has not When preparing the proposal Some explanation was inserted adequately described partners discussed plans for the into the Budget section. management capacity to pilots. For example, partners of conduct this task within the Estonia and Lithuania time-frame of the project, participated in the national which will be very tight for such exchanges in SEPEN tender and a complex task. Possibly received targeted guidance on mitigating this risk is that the improvements of HWF project partners have already planning – coordinated by identified the types of care and AGENAS-, which resulted in their respective very detailed situation analysis clinics/departments during the of the current HWF challenges preparation of the proposal, at national level. These are new which supports a successful evidences from 2020, which implementation.” could be further developed and used in TaSHI. “The proposal presents a Experience of previous projects No changes, as 9.4 Quality & partnership of different (e.g. the JAEUHWF, SEPEN Joint Capacity of the Partnership backgrounds (academia, Tender) proved the section highlights the essential research, public effectiveness and feasibility of nature of reaching all target administration, and health reaching out to and involving groups and stakeholders, as authority). This is well justified different stakeholder groups in well as experiences from relative to the design of the order to reach the most previous projects. project but also a challenge in successful outcome and results. management as very different Stakeholder involvement and business cycles will need to engagement is a crucial step in align.” any kind of implementation, which is included in TaSHI WP2, WP3 and WP5 pilots’ first phase. “Nevertheless, the involvement The TaSHI consortium itself has Section 3 on Stakeholders and of healthcare providers in the no healthcare provider among target groups was extended, as consortium is limited and its the partners, however the well as the description of the enhancement would have strong links towards healthcare “TaSHI Advisory Board” with strengthened the partnership.” providers is secured (see for the potential stakeholders to example the case of Lithuania be involved (e.g. European or Estonia, where ministries Hospital Federation, European 5 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 responsible for operation can Forum for Primary Care, have a significant influence on European Patients’ Forum, reorganizing and optimising European Federation of Nurses care, or on implementing Associations, European healthcare reforms, or AGENAS Specialist Nurse Organisation, in Italy that is responsible for The Standing Committee of monitoring the health system European Doctors, Council of and contributing to enhance European Dentists, system performance). Pharmaceutical Group of the European Union, European Health Management Association, etc.). These EU- level, international umbrella organizations can easily reach the relevant national actors for different tasks. “Financial management is SU will provide a part time In the detailed budget sheet SU stated to be run by full time financial officer for TaSHI. provided different categories of financial officer. There are only staff costs. researchers in the salary list but apparently the person will be provided by the SU.” “In overall budget is relevant to TaSHI team provided a more Budgeting principles were the objectives of the proposal. detailed paragraph for the added to section 10. Division of the budget among budget section. cost items is valuable information. But the proposal does not describe any other budgeting principles.” “Clarification is needed for the The status of PoliS-Lombardia is statement. "Not all the unique in the TaSHI project, as beneficiaries have the same they requested no EU division of national and EU contribution for their contribution, as PoliS- participation, and they Lombardia resigned from its EU resigned their share, which contribution, so the share of were distributed among other partners has been partners. Supporting increased to 66 % EU documents were submitted to contribution." Chafea in order to accept this division of budget. “The cost per month for the Indeed. These are the salary In the detailed budget sheet researcher of AGENZIA levels declared by partners. NIVEL and AGENAS provided a NAZIONALE and NIVEL is on the more detailed breakdown of high side.” different categories of staff costs. 6 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 “At the Summary of the Effort it WP leaders usually receive No changes. is still not clear why SU is extra person days for increased receiving 50.5 Total Person tasks in WPs they manage. Months out of 115 in total for Semmelweis University is the the project. These person Consortium leader, WP leader months are mainly dedicated to of two WPs of the 5 WPs (WP1 WP1 and WP2 that includes and WP2 - and also co-lead in management, dissemination WP4). WP1 and WP2 are and communication. At the horizontal WPs with same time the non-personnel continuous activities related costs for evaluation and throughout the whole duration dissemination receives very of the project mostly executed little budget (less than 1.5%) by the WP leader with a according to budget moderate contribution of other description.” partners. Furthermore, half of the milestones and deliverables will be completed and delivered by SU. Regarding the non-personnel costs, we modified the budget accordingly and delegated travel budget for the closing conference to be organized in Rome. Avoiding duplications TaSHI team checked all details Deliverables and the timetable including the information of the were revised and reconsidered, tables filled automatically in small changes were the platform implemented throughout the proposal. The proposal has not Semmelweis University will The explanation was added to adequately described coordinate the work and 2.8 Project management management capacity. planned activities in all WPs, structure and ensure the adequate infrastructure (e.g.: internal communication and monitoring platform) for fulfilling the workplan and quality delivery in the given timeframe. The pilots do not intend to use The Calderdale framework was The clarification was added to the Calderdale tools’. developed by a team work in 2.5 Methods and means 2011, the Effective Workforce Solutions Ltd. Then, in the following years was successfully used in different health care settings in change management project regarding task shifting, multidisciplinary team building, skill mix design, etc. The framework proposes a stepwise approach that TaSHI 7 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 will replicate in the different pilot sites, adopting a flexible implementation perspective, meaning that, based on the needs of each pilot site, TaSHI will go more in depth in specific steps of the framework. The original Calderdale Framework proposes also, for each step of the implementation path, some tools to support the implementers. But those specific tools are protected by copyright and can be used only by the Calderdale Framework Practitioners. 5 new deliverables added WP2: D5 - Mid-term dissemination and communication report (M18) D7 - Dissemination and communication report (M36) WP3: D10 - Mid-term evaluation report (M18) D11 - Evaluation report (M36) WP4: D13 - Pilot materials of the practical training materials and curriculum (M15) 8 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Table of contents History of changes .................................................................................................................................. 1 2.1. Problem analysis including evidence base ................................................................................... 10 2.2. Goals and objectives of the Project .............................................................................................. 16 2.2.1 General Objectives of the Project .................................................................................... 16 2.2.2 Specific Objective(s) of the Project .................................................................................. 17 2.3. Stakeholder - Target groups .......................................................................................................... 19 2.4. Political Relevance ......................................................................................................................... 21 2.4.1. Contribution to the Annual Work Plan ............................................................................ 22 2.4.2. Added value ...................................................................................................................... 24 2.4.3. Pertinence of geographical coverage ............................................................................... 27 2.4.4. Context of the project work ............................................................................................. 27 2.5. Methods and means ...................................................................................................................... 32 2.6. Expected outcomes and benefits of the project........................................................................... 38 2.7. Gantt Chart .................................................................................................................................... 41 2.8. Project management ..................................................................................................................... 42 2.8.1. Methods ............................................................................................................................. 42 2.8.2. Governance, Roles, Responsibilities.................................................................................. 42 8.2.3. Processes & Artefacts ........................................................................................................ 43 2.8.4. Quality& Capacity of the partnership ............................................................................... 44 2.8.5. Capacity of the staff ........................................................................................................... 47 2.8.6. Financial management ..................................................................................................... 49 2.9. Budget ............................................................................................................................................ 50 2.9.1. Content description and justification .............................................................................. 50 2.9.2. Detailed budget ................................................................................................................ 51 9 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 2.1. Problem analysis including evidence base Towards health system sustainability Policy making in the EU has focussed on the sustainable development goals and the universal health coverage (SDGs and UHC) for a long time, which contributes to the sustainability of health systems. The EU sets its priorities and actions, and ensures implementation of various programmes that support developing and strengthening the health systems in Member States (MS). Health systems do not operate in isolation, but several factors influence their efficiency and efficacy in the cross-border arena of the internal market. Among the key functions of health systems, e.g. service delivery, financing, governance and resources, the appropriate distribution and allocation of human resources is essential (Thomas et al., 20201). Health workforces need to be planned carefully in various health systems, and efficient management of care could contribute to optimising care pathways, understanding diverse emerging workforce issues and future trends (McKee et al., 20202). Health workforce planning Health workforce (HWF) planning aims to ensure the right number of healthcare personnel, with the right skills at the right time and in the right place (European Commission, 20123). This exercise is indeed challenging, because of the complexity of the planning processes and data requirements to design appropriate tools for projection models (Kovacs et al., 20164). Previous international studies called attention to the shortages and uneven distribution, as well as skills mismatches and new emerging roles of health workforces in several MS (Buchan et al., 20145, European Commission, 20126,European 1 Thomas, S., Sagan, A., Larkin, J., Cylus, J., Figueras, J., Karanikolos, M. (2020). Strengthening health - systems resilience. Policy Brief 36. Retrieved from: https://apps.who.int/iris/bitstream/handle/10665/332441/Policy-brief%2036-1997-8073- eng.pdf 2 McKee, M., Mercur, S., Edwards, N., Nolte, E. (2020). The Changing Role of the Hospital in European Health Systems. European Observatory of on Health Systems and Policies. Retrieved from: https://www.euro.who.int/__data/assets/pdf_file/0010/448048/Changing-role-of-hospitals-eng.pdf 3 European Commission. (2012). EU level Collaboration on Forecasting Health Workforce Needs, Workforce Planning and Health Workforce Trends – A Feasibility Study. Final Report. Retrieved from: https://ec.europa.eu/health/sites/health/files/workforce/docs/health_workforce_study_2012_report_en.pdf 4 Kovacs, E., Girasek, E., Kovács, R., Aszalos, Z., Eke, E., Cserháti, Z., Ragány, K. (2016). Report on Health Workforce Planning Data. Joint Action on Health Workforce Planning and Forecasting. Retrieved from: http://healthworkforce.eu/archive/ 5 Buchan, J., Wismar, M., Glinos, I.A., Bremner, J. (2014). Health Professional Mobility in a Changing Europe. New dynamics, mobile individuals and diverse responses (Eds.), Vol. 2. Observatory Study Series. Retrieved from: https://www.euro.who.int/__data/assets/pdf_file/0006/248343/Health-Professional-Mobility-in-a-Changing-Europe.pdf 6 European Commission. (2012). EU level Collaboration on Forecasting Health Workforce Needs, Workforce Planning and Health Workforce Trends – A Feasibility Study. Final Report. Retrieved from: https://ec.europa.eu/health/sites/health/files/workforce/docs/health_workforce_study_2012_report_en.pdf 10 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Commission, 20197, Joint Action Final Guide, 20168, Bond et al., 20179, OECD, 201810, Wismar et al., 201111). The Companion Report (2019) published as part of the State of Health in the EU Country Health Profiles defined task shifting as a predominant example of skill-mix innovations with great potentials among the HWF, especially by enhancing the roles of nurses and pharmacists (European Commission, 201912). The MUNROS project identified significant changes regarding the altering roles of health professionals in all EU MS studied, with the most significant changes identified in the Netherlands, England and Scotland (Maier et al., 201813). The project reflected upon the growing prevalence of the specialised and advanced roles of nurses and health care assistants, and identified specialised roles of physicians, as well as extended and more independent roles of nurses. The study highlighted the digital and technological development of health care and the need for more generic competencies as the main drivers of changes in these professions. The latest EU-level mapping study by the SEPEN tender (2020) also highlighted that many MS still reported on the shortage or lack of HWF or access to care and a significant decrease in supply. Some Member States are facing significant shortages of health professionals, and reported severe geographical imbalances with regards to accessibility of care (e.g. Estonia, Hungary, Italy or Lithuania) (SEPEN, 202014). In addition, SEPEN results concerning system challenges have already underlined the benefits of digital health solutions in healthcare management and organization (e.g. SEPEN mapping study, SEPEN workshop 5 outcomes). On the other hand, an increased demand from the population has been recognised so far by several previous studies (Joint Action - Chrodis 2014-2017 and Chrodis Plus 2017-202015). The ageing trend of the European population poses some challenges towards EU health systems, as it increases the need for long-term care, treatment of chronic conditions, and managing multi-morbidity (Kingston et al., 201816). New 7 European Commission. (2019). State of Health in the EU: shift to prevention and primary care is the most important trend across countries. Press release. Retrieved from: https://ec.europa.eu/commission/presscorner/api/files/document/print/en/ip_19_6336/IP_19_6336_EN.pdf 8 Joint Action on Health Workforce Planning and Forecasting. (2016). Final Guide of the Joint Action on Health Workforce Planning and Forecasting. Retrieved from: http://healthworkforce.eu/wp- content/uploads/2016/11/WP2_FINAL_GUIDE_final_version.pdf 9 Bond, C., Bruhn, H., de Bont, A., van Exel, J., Busse, R., Sutton, M., Elliott, R. (2017). The iMpact on practice, oUtcomes and costs of New roles for health pROfeSsionals: a study protocol for MUNROS. BMJ Open, 6, 010511 . Retrieved from: https://bmjopen.bmj.com/content/6/4/e010511 10 OECD (2018), Feasibility Study On Health Workforce Skills Assessment - Supporting health workers achieve person- centred care. Retrieved from: https://www.oecd.org/health/health-systems/Feasibility-Study-On-Health-Workforce-Skills- Assessment-Feb2018.pdf 11 Wismar, M., Maier, C.B., Glinos, I.A., Dussault, G., Figueras, J. (2011). Health Professional Mobility and Health Systems - Evidence from 17 European countries. (Eds.). Observatory Study Series. Retrieved from: https://www.euro.who.int/__data/assets/pdf_file/0017/152324/Health-Professional-Mobility-Health-Systems.pdf?ua=1 12 European Commission. (2019). State of Health in the EU: shift to prevention and primary care is the most important trend across countries. Press release. Retrieved from: https://ec.europa.eu/commission/presscorner/api/files/document/print/en/ip_19_6336/IP_19_6336_EN.pdf 13 Maier, C.B., Köppen, J., Busse, R.; MUNROS team. (2018). Task shifting between physicians and nurses in acute care hospitals: cross-sectional study in nine countries. Hum Resour Health, 16(1), 24. doi:10.1186/s12960-018-0285-9 14 SEPEN. (2020). Mapping national health workforce planning and policy in the EU. Presented at the SEPEN webinar of July 24. Retrieved from: http://healthworkforce.eu/wp-content/uploads/2020/07/SEPEN_Webinar_24July_Final.pdf 15 Chrodis Plus Joint Action (2017-2020). Website: http://chrodis.eu/ 16 Kingston, A., Robinson, L., Booth, H., Knapp, M., Jagger, C.; MODEM project. (2018). Projections of multi-morbidity in the older population in England to 2035: estimates from the Population Ageing and Care Simulation (PACSim) model. Age Ageing, 47(3), 374-380. doi:10.1093/ageing/afx201 11 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 treatments, new models of care, new medicines, and even new expanded roles of health professionals represent a new type of needs from patients, clients and citizens. The roles and responsibilities of health professionals have changed significantly in the last few decades, therefore their transitions needs to be managed effectively (McKee et al., 202017). Rapid adaptation and resilience - with or without COVID-19 HWF planning and system performance monitoring aimed to analyse data, anticipate changes and find drivers for sustainability and cost effectiveness in the long run. In the different phases of situational analysis, planning, implementation, monitoring and evaluation, several different actions from the fields of leadership, stewardship, finance, education and policy can be executed (WHO, 201018, WHO, 201619). While improving HWFs and system components, better health services and better health outcomes are expected as the main goals. The recently evolving models comprise new approaches and solutions with significant potentials, such as the paradigm shift towards integrated care, home-based care, patient empowerment, self-care management and patient-centered provision system, and last but not least, the adoption of digital health solutions. The current models of healthcare are not resilient enough to completely and adequately address the emerging challenges posed by higher demand for health services, shortages of health personnel, available fiscal space, and particularly the occurrence of emergency risks (e.g. COVID-19). In the case of an emergency situation (e.g. COVID-19), embracing flexibility is a key. Health policy recommendations aimed to strengthen the health systems response to the COVID-19 outbreak, and one particular area ensuring sufficient workforce capacity and allocation of human resources became the center of attention in each of the EU MS (COVID response monitor20). The latest issues and dialogues determine a new attitude, namely, that HWF planning should not focus solely on workforce quantity, but quality, and secondly a more strategic approach is needed to combat emerging challenges, e.g. global pandemic situations. Task shifting Task shifting per definition consists of delegation of tasks, and sharing roles within health professions, different groups of health professionals, also shifts to patients or to machines (European Commission, 201921). The multiple types of task shifting and sharing - as bidirectional phenomena - tend to focus on 17 McKee, M., Mercur, S., Edwards, N., Nolte, E. (2020). The Changing Role of the Hospital in European Health Systems. European Observatory of on Health Systems and Policies. Retrieved from: https://www.euro.who.int/__data/assets/pdf_file/0010/448048/Changing-role-of-hospitals-eng.pdf 18 World Health Organization. (2010). WHO HRH Action Framework. Retrieved from: https://www.who.int/hrh/tools/en/ 19 World Health Organization. (2016). Global strategy on human resources for health: Workforce 2030. World Health Organization. Retrieved from: https://apps.who.int/iris/bitstream/handle/10665/250368/9789241511131- eng.pdf?sequence=1 20 World Health Organization, European Commission, & European Observatory of Health Systems and Policies. (2020). COVID-19 Health System Response Monitor. Retrieved from: https://www.covid19healthsystem.org/mainpage.aspx 21 European Commission. (2019). Task Shifting and Health System Design - Report of the EXPH. Luxembourg: Publications Office of the European Union. Retrieved from: https://ec.europa.eu/health/sites/health/files/expert_panel/docs/023_taskshifting_en.pdf 12 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 enhancement, supervision-mentoring, substitution-delegation and innovation (McKee et al., 202022; WHO, 200623). FIGURE 1 - Multiple types of task shifting - adapted from WHO, 2006 & McKee, 2020 Nowadays, task shifting processes are apparently utilised in numerous care sectors, including primary care (Nuttal, 201824) mental health care (Martínez-González et al., 201525), and acute hospital care (Maier et al., 201826; Maier et al., 201827). With regards to professional groups, task shifting is mostly utilised in the nursing (Maier, 201528), pharmacy (Jebara et al., 201829), and midwifery (Dawson et al., 201530) professions. Task shifting between nurses and GPs in primary care is highly prevalent in some 22 McKee, M., Mercur, S., Edwards, N., Nolte, E. (2020). The Changing Role of the Hospital in European Health Systems. European Observatory of on Health Systems and Policies. Retrieved from: https://www.euro.who.int/__data/assets/pdf_file/0010/448048/Changing-role-of-hospitals-eng.pdf 23 World Health Organization. (2006). Task shifting to tackle health worker shortages. HIV/AIDS Programme; strengthening health services to fight HIV/AIDS. Retrieved from: https://www.who.int/healthsystems/task_shifting_booklet.pdf 24 Nuttall, D. (2018). Nurse prescribing in primary care: a metasynthesis of the literature. Primary health care research & development, 19(1), 7–22. https://doi.org/10.1017/S1463423617000500 25 Martínez-González, N.A., Tandjung, R., Djalali, S., & Rosemann, T. (2015). The impact of physician-nurse task shifting in primary care on the course of disease: a systematic review. Hum Resour Health, 13, 55. Published 2015 Jul 7. doi:10.1186/s12960-015-0049-8 26 Maier, C.B., Köppen, J., Busse, R.; MUNROS team. (2018). Task shifting between physicians and nurses in acute care hospitals: cross-sectional study in nine countries. Hum Resour Health, 16(1), 24. doi:10.1186/s12960-018-0285-9 27 Maier, C.B., Batenburg, R., Birch, S., Zander, B., Elliott, R., & Busse, R. (2018). Health workforce planning: which countries include nurse practitioners and physician assistants and to what effect? Health Policy, 122(10):1085-92. 28 Maier, C.B. (2015). The role of governance in implementing task-shifting from physicians to nurses in advanced roles in Europe, U.S., Canada, New Zealand and Australia. Health Policy, 119(12),1627-1635. doi:10.1016/j.healthpol.2015.09.002 29 Jebara, T., Cunningham, S., MacLure, K., Awaisu, A., Pallivalapila, A., & Stewart, D. (2018). Stakeholders' views and experiences of pharmacist prescribing: a systematic review. Br J Clin Pharmacol, 84(9), 1883-1905. doi:10.1111/bcp.13624 30 Dawson, A.J., Nkowane, A.M., & Whelan, A. (2015). Approaches to improving the contribution of the nursing and midwifery workforce to increasing universal access to primary health care for vulnerable populations: a systematic review. Hum Resour Health, 13, 97. doi:10.1186/s12960-015-0096-1 13 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 countries (Maier et al. 201731, Karimi-Shahanjarini et al., 201932; van der Biezen et al., 201733), while task shifting in the surgical or radiography professions have also been effectively implemented in some countries (Anthony et al., 201934; Bhanbhro et al., 201135; du Plessis & Pitcher, 201536). The so-called non-medical prescribing also serves as an effective way to increase the quality of health service delivery by extending the roles of health professionals and allowing medical prescribing for example in primary care settings (Graham-Clarke et al., 201837). Moreover, the enhanced roles of the so-called Advanced Practice Nurse (APN) are highly prevalent in the Netherlands, England, or Scotland, increasing the quality and effectiveness of care by expanding nurses’ scope-of-practice (Lovink et al., 201938; Lovink et al., 201939; Maier et al., 201840; SEPEN, 202041). In general, the potentials in and significant importance of task shifting and sharing processes are unquestionable. The contemporary literature indicates that task shifting can increase the size of the HWF, thereby providing a way to tackle HWF shortages and geographical imbalances, as well as the significant challenges and overburdening of the HWF. Task shifting can increase the efforts of moving towards a more integrated and patient centered health care. Task shifting has a key role in achieving a well-functioning health system, but it is also posing challenges related to the consequent change in current practices and organisation of care. For this reason, well-structured concepts, guidelines, and other supporting tools are required to reduce the negative impact of the altering ecosystem, while maximising the benefits in parallel. As an action to address the human resource crisis, transferring or shifting professional tasks to individuals with fewer qualifications and less extensive training, task shifting can serve as an effective 31 Maier, C.L., Aiken, L.H., & Busse, R. (2017). Nurses in advanced roles in primary care: Policy levers for implementation. OECD Health Working Papers, No. 98. OECD Publishing: Paris. https://doi.org/10.1787/a8756593-en. 32 Karimi-Shahanjarini, A., Shakibazadeh, E., Rashidian, A., et al. (2019). Barriers and facilitators to the implementation of doctor-nurse substitution strategies in primary care: a qualitative evidence synthesis. Cochrane Database Syst Rev, 42. 33 van der Biezen, M., Derckx, E., Wensing, M., & Laurant, M. (2017). Factors influencing decision of general practitioners and managers to train and employ a nurse practitioner or physician assistant in primary care: a qualitative study. BMC Fam Pract, 18(1),16. 34 Anthony, B.F., Surgey, A., Hiscock, J., Williams, NH, & Charles, J.M. (2019). General medical services by non- medical health professionals: a systematic quantitative review of economic evaluations in primary care. British Journal of General Practice, 69(682), 304-313. https://doi.org/10.3399/bjgp19X702425 35 Bhanbhro, S., et al. (2011). Assessing the contribution of prescribing in primary care by nurses and professionals allied to medicine: a systematic review of literature. BMC Health Serv Res, 11, 330. 36 du Plessis, J., et al. (2015). Towards task shifting? A comparison of the accuracy of acute trauma-radiograph reporting by medical officers and senior radiographers in an african hospital. Pan African Medical Journal, 21, 308. doi: 10.11604/pamj.2015.21.308.6937 37 Graham-Clarke, E., Rushton, A., Noblet, T., & Marriott, J. (2018). Facilitators and barriers to nonmedical prescribing – A systematic review and thematic synthesis. PLoS ONE, 13(4), 0196471. https://doi.org/10.1371/journal.pone.0196471 38 Lovink, M.H., van Vught, A., Persoon, A., Koopmans, R., Laurant, M.G.H., & Schoonhoven, L. (2019). Skill mix change between physicians, nurse practitioners, physician assistants, and nurses in nursing homes: A qualitative study. Nurs Health Sci, 21(3), 282-90. 39 Lovink, M.H., Laurant, M.G., van Vught, A.J., Maassen, I., Schoonhoven, L., Persoon, A., et al. (2019). Substituting physicians with nurse practitioners, physician assistants or nurses in nursing homes: a realist evaluation case study. BMJ Open, 9(5), 028169. 40 Maier, C.L., Aiken, L.H., & Busse, R. (2017). Nurses in advanced roles in primary care: Policy levers for implementation. OECD Health Working Papers, No. 98. OECD Publishing: Paris. https://doi.org/10.1787/a8756593-en. 41 SEPEN. (2020). Mapping national health workforce planning and policy in EU. Presented at the SEPEN webinar of July 24. Retrieved from: http://healthworkforce.eu/wp-content/uploads/2020/07/SEPEN_Webinar_24July_Final.pdf 14 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 way to tackle the HWF challenges and expand available HWF (WHO, 200642; 200843). Task shifting and task sharing processes can stand as effective ways to mitigate the negative effects of the challenges and the overburdening of the HWF and manage and facilitate a better health care service delivery. Due to the complexity of the issue - such as the healthcare system-specific characteristics, intersectoral nature (e.g. involvement of the education sector, healthcare providers, IT industry), vertical and horizontal change and task shifting processes - a comprehensive and locally customisable framework and tools are needed. Such a framework should pool the currently fragmented approaches existing in MS at different levels (e.g. academia, healthcare providers, governmental institutions, etc.), with an emphasis on the main challenges and benefits observed in MS. Meeting the needs of the patient As chronic conditions have been becoming more frequent, the cumulative population needs for healthcare shows an increasing trend. This requires a different professional-patient relationship, and a new model of care. There is a shared responsibility, because nowadays patients tend to contribute more to their own healthcare, prevention and rehabilitation as well. Patients are more empowered to seek care, make an informed choice about care providers or treatments. Patient empowerment and citizen engagement shows more significant relevance for optimising care and client pathways in health and care sectors. On the other hand, patient empowerment resulted in higher rates of self-care management. Clients tend to dedicate more attention to health prevention, using digital health solutions to monitor for instance their own chronic conditions (see good practices of Chrodis (2015)44). In addition, not only in preventive measures, but higher levels of contribution have become more frequent, as health literacy and digital health literacy of patients and citizens is rapidly emerging (Nutbeam, 200845; Gopal et al., 201946). Patient empowerment in itself can make a positive impact on health service delivery, and provide a more patient-centered and personalised care. A higher proportion of self-care management among patients can have a positive effect on the role of health professionals by providing better patient compliance-concordance and self-monitoring, a more preventive attitude, thereby easing the burden on professionals. Moreover, emphasising the role of e-health, m-health, telemedicine, information and communication technology (ICT), as well as the digitalisation of patient health records can further lessen such burdens. Cutting edge technology and disruptive innovation It is important to mention digitalisation and the exponential growth of accessible information and evidence, which have the potential to bring significant benefits and offer solutions to address HWF- related challenges. However, this opportunity can only be exploited if adequate policies and approaches are adopted in healthcare, social care, and also in the education sector. Co-creation and inter-professional teams are becoming the cornerstone of integrated care, which implies the need to train individuals, with a different perspective and sectoral knowledge, on how to maximise the 42 World Health Organization. (2006). Task shifting to tackle health worker shortages. HIV/AIDS Programme; strengthening health services to fight HIV/AIDS. Retrieved from: https://www.who.int/healthsystems/task_shifting_booklet.pdf 43 World Health Organization. (2008). Task shifting - Global recommendations and guidelines. World Health Organization. Retrieved from: https://www.who.int/healthsystems/TTR-TaskShifting.pdf?ua=1 44 Join Action on Chrodis (2015). Good practices in health promotion & primary prevention of chronic diseases. Summary report. Retrieved from: http://chrodis.eu/wp-content/uploads/2015/09/Summary-Report-CHRODIS-WP5-Task-3_Version- 1.3.pdf 45 Nutbeam, D. (2008). The evolving concept of health literacy. Soc. Sci. Med, 67(12), 2072–2078. 46 Gopal, G., Suter-Crazzolara, C., Toldo, L., & Eberhardt, W. (2019). Digital transformation in healthcare - architectures of present and future information technologies.Clin Chem Lab Med, 57(3), 328-335. doi: 10.1515/cclm-2018-0658. 15 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 productivity level throughout the joint work. As an example, physicians, data experts, and IT professionals (with different sectoral knowledge) should be able to effectively communicate and have a common understanding in order to establish and adopt an Artificial Intelligence-based image interpretation system which supports for instance image screening in diagnostics. From the HWF policy and planning perspective, the above-mentioned issues highlight the necessity for establishing new approaches and the adjustment of current planning models, guidelines, and also the proper legal environment. The new models should consider factors such as the emergence of new professions and career pathways, vanishing professions due to automatisation of jobs, and especially task shifting (McKinsey 201747, 201848). A more holistic, intersectoral approach and cross-planning of workforce stock is required due to the fact that professionals from other sectors (e.g. engineers, data scientists) are taking key roles in the healthcare digitalisation- and digital transformation process. Digital disruption can answer several HWF-related challenges, but it also brings new complex issues which need to be addressed adequately. Digital solutions - such as robotics showing a great potential in surgery (Prete, Pezzolla, et al. 2018, Ren, Cao, et al. 2019)49 50 - should be considered as an additional “actor” in healthcare provision (besides the HWF, the patients and carers), and task shifting initiatives should incorporate them during the definition of the optimal distribution of tasks. It is also inevitable to have a comprehensive and transparent framework, which defines roles and responsibilities, and ensures that task shifting and digital disruption will not jeopardise quality of care and patient safety. 2.2. Goals and objectives of the Project 2.2.1 General Objectives of the Project The HWF in Europe is facing significant challenges due to the ageing population and ageing HWF, shortages and unequal distribution of HWF and resources, the growing demands of better-integrated and patient centred care, as well as the rise of multi-morbidity and non-communicable diseases. Moreover, the increased demand for health services are over-burdening the HWF, putting strains on health care workers. Effective health service delivery requires established and clear guidelines and sources of evidence. Health systems, therefore, need dynamic and resilient HWFs, provided with optimal skill-mix and competencies. Consequently, evidence-based reforms are highly needed to address and tackle the challenges health care systems and the workforce are facing. The General and strategic objectives of the project are the following: 1) Providing added value on the concept, notion, and implementation of task shifting at EU-, national- and regional levels, as well as an update on the existing tools and methods to support and upscale the implementation of task shifting in EU MS. 2) Providing a novel understanding, new and up-to-date knowledge on task shifting and on transferability of existing good practices in implementation. Investigating the feasibility, challenges, benefits and impact of different forms of task shifting through case studies based on hands-on experience from 5 pilot implementation sites. 47 McKinsey Global Institute. (2017). Technology, jobs, and future work. Briefing note prepared for the Fortune Vatican Forum, December 2016. 48 McKinsey Global Institute. (2018). Skill shift automation and the future of the workforce. Discussion paper. 49 Prete, Pezzolla, et al. Robotic Versus Laparoscopic Minimally Invasive Surgery for Rectal Cancer: A Systematic Review and Meta-analysis of Randomized Controlled Trials. Annals of surgery, 2018;267(6) 50 Ren, Cao, et al. Efficacy and reliability of active robotic-assisted total knee arthroplasty compared with conventional total knee arthroplasty: a systematic review and meta-analysis. Postgraduate medical journal, 2019 16 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 3) Disseminating case studies and fostering knowledge sharing and exchange across EU MS on the specific processes and features of task shifting via online events (e.g. webinars, thematic workshops, and presentations). 4) Progressing implementation by facilitating the dialogues and exchanges between the relevant stakeholders, strengthening governance and stakeholder engagement for transferring and upscaling task shifting practices and policies supporting health reforms for HWF development. Enhancing cultural sensitivity, flexibility and readiness, as well as organizational adaptation to task shifting. 2.2.2 Specific Objective(s) of the Project The Specific SMART operational objectives of the project are the following: 1) Mapping practices and developing tools - strengthening the knowledge on task shifting ● Identifying and analysing the concept and implementation of task shifting, and providing an update on existing tools to incorporate task shifting and task sharing processes. ● Providing suggestions of changes in the legal and policy environment to overcome the barriers to the recruitment and retention of healthcare workforce in underserved areas, as well as barriers regarding the implementation of task shifting processes. ● Providing good practices for introduction of task-shifting especially with the consideration of the effects on patient safety and health service performance, and providing recommendations on the impact of new skills, skills for utilising digital solutions, while providing aims regarding the re- and upskilling of the HWF. 2) Provide recommendations on training and upskilling - share and utilise experiences of implementation pilots on task shifting ● Providing recommendations on mitigating the negative effects of changing skill-mixes and competencies across different sectors and occupational groups. ● Providing recommendations for future HWF skills to aid the better adaptation to new developments, and providing guidance for the upskilling of nurses, including digital skills, with the involvement of IT specialists. ● Developing curricula for digital, interpersonal, and management skills for physicians, nurses, pharmacists, and other health personnel, and developing practical guidelines for public authorities and healthcare providers which will serve as operational tools supporting their healthcare workforce policies in relation to challenges in these fields. The curricula will serve as a novel educational tool for training on task shifting and sharing. By providing clear guidelines on the implementation of task shifting, the outcomes of the project can also serve as solutions for tackling cultural differences and barriers. Specific Objectives of the project provide tangible products, practices, tools and recommendations for policy makers and relevant stakeholders for the implementation of task shifting processes. 17 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Specific Specific Objective Title and Description Objective ID 1) Mapping practices and developing tools - strengthening the knowledge on task shifting Process Indicator(s) Target value Set-up and execute “Dissemination and communication 1 strategy by WP2 strategy and plan” by WP2 1 strategy by WP3 Set-up and execute “Evaluation strategy and plan” by WP3 1 plan by WP4 Set up and execute “Research plan” for WP4 - Stage plan for 1 plan by WP5 desk research Set up and execute an “Implementation plan” for pilot sites WP5 - Stage plan for designing pilot phases Output Indicator(s) Target value Number of deliverables/documents: ● Deliverable of Collection of useful tools and 1 report with 5-10 tools and practices in task shifting practices by WP4 ● Deliverable of Case studies of implementation sites 1 report with 5 extended case study ● Deliverable of Guidebook of task shifting descriptions plus annexes by WP5 1 integrated guidebook by WP5 Dissemination products by WP2: ● TaSHI website 1 project website ● TaSHI newsletter 9 newsletter editions ● Articles, short posts on EU HPP specific “Health At least 24 articles, short posts Workforce” forum, Social media sites (linkedin, annually facebook, twitter), Partners websites and At least 3-4 webinars/online events newsletters, Partners Youtube channels annually ● Webinars/Joint webinars with related projects/online events 1 leaflet ● Rollup and leaflet, proportion material production Outcome/Impact Indicator(s) Target value Increased number of improved methods and tools for task Publication of 5-10 methods and shifting tools Increased number of pilots, case studies, initiatives, actions, Publication of 5-10 new case practices on task shifting in the EU studies Increased number of stakeholders informed, engaged, Reaching and involving all 27 MS participated representing all EU Member States and the UK 18 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Specific Specific Objective Title and Description Objective ID 2) Provide recommendations on training and upskilling - share and utilise experiences of implementation pilots on task shifting Process Indicator(s) Target value Design and execute dissemination and communication 1 strategy by WP2 strategy WP2 1 strategy by WP3 Design and execute event plan and execution WP2 Design and execute evaluation strategy by WP3 Output Indicator(s) Target value Number of deliverables/documents: 1 report containing practical training materials and advices on ● Deliverable of Practical training materials and curriculum curriculum ● Deliverable of Set of recommendations for task 1 report with a set of shifting actions recommendations on the EU and country/MS and organisational level Outcome/Impact Indicator(s) Target value Increased number of experts/stakeholders participating in Reaching and involving all 27 MS policy dialogues on task shifting and the UK Increased number of policy recommendations on task 1 set of recommendations shifting 1 curriculum Increased number of education programmes and training materials 2.3. Stakeholder - Target groups This section describes the main stakeholders to be considered as the primary beneficiary of the project outcomes, and the target group to be actively engaged during the stakeholder management conducted by WP2. It is important to highlight that the heterogeneity of the listed stakeholders implies the need for tools/recommendations tailored to the given target group. European institutions and organisations The implementation of initiatives focusing on task shifting should be supported by a top-down approach, hence the European bodies (e.g. European Commission DGs) and the relevant umbrella organisations (e.g. European Hospital Federation, European Forum for Primary Care, European Patients’ Forum, European Federation of Nurses Associations, European Specialist Nurse Organisation, The Standing Committee of European Doctors, Council of European Dentists, Pharmaceutical Group of the European Union, European Health Management Association, etc.) are key target groups of the project. The project will produce evidence-based recommendations on supporting task shifting, which will be disseminated and shared at the EU-level. The uptake of actions might rely on the contribution and activation of these organisations. 19 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Regulators, health workforce planners, and policy makers The national legal environment and policy initiatives are crucial for a successful transformation of current models of healthcare provision, and for the modification of already existing practices, treatment pathways, and work processes. Effective policies are needed in order to reach a sustainable and resilient provision system, and the project aims to engage the key policy actors (ministries of health and education and labour) by leveraging the consortium’s existing networks and further extrapolate it during the project cycle. Regional governing bodies, local municipalities Actors from the meso-level are also considered as target groups in order to reach the highest possible impact and outreach. The need for intersectoral approaches also underlines the importance of engaging and guiding these stakeholders (e.g. regional authorities for healthcare organisation). Educational institutions Undergraduate and postgraduate training institutions are also the main enablers of ensuring the knowledge base and attitudes required for an effective adoption of new roles, competencies, and skill- mix compositions in task shifting. The educational materials and recommendations on the curriculum development - produced during the project cycle - will especially benefit this target group (e.g. universities and colleges with health education, associations of educators and trainers, and NGOs). Institutions providing CPD programmes Another important education-related pillar is the training of the current HWF stock, hence the institutions providing life-long learning and CPD programmes are also considered as key actors and facilitators of change. In addition, on-site training programs (e.g. learning by doing format facilitated by a supervisor) and CPD activities are especially crucial given the constantly changing service provision supported by innovative digital health solutions. Professional associations The involvement of professional associations (e.g. medical or dental chambers, orders for nursing and pharmacists, associations of healthcare managers and/or hospital management, institutes of e-health and digital health solutions etc.) is essential to reach a sustainable and nationally adaptable guide for task shifting implementation. The scalability and impact of the project pilots are also highly dependent on the support of such associations. Healthcare providers, health professionals As healthcare providers (both organisations and individual providers) will be the “end users” of the policies/actions implemented at local, regional, national, or EU-level, it is important that the tools and guidelines are designed with the initial engagement of providers - for example applying co-creation methods during the pilots. The implementation of the project will be carried out on different levels of care (e.g. primary care, hospitals) in each of the implementation countries to secure the adequate involvement of healthcare providers. Patients, clients, citizens The general public is also a key enabler of change. Although the pilots does not include approaches which would explicitly increase the role of patients in disease management (e.g. self-care), the project needs to provide sufficient guidance as patients will be indirectly impacted by the organisational changes. 20 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 2.4. Political Relevance HWF research and policy concluded the crisis of human resources for health (HRH) two decades ago, and several challenges have been addressed in the EU so far. With the enlargement of the EU, health professionals entered different health systems to deliver care, while changing their place of residence. Cross-border movement of the HWF became more significant, which called the attention of the EU internal market to ensure safety and harmonisation of care provision across the EU MS. In 2005 with the EU Directive 2005/36/EC51 on mutual recognition of qualifications listed the basic features of sectoral health professions, facilitating the mobility of the workforces and automatising licencing procedures (Kovacs et al., 201452). During the Belgian and Hungarian Presidency in 2010-2011, the issue of HRH development received growing attention. The EU Feasibility Study53 (2012), and the EU Action Plan for Health Workforce54 in 2012 highlighted the predicted magnitude of HWF shortage for 2020. The Action plan encouraged EU countries to work together to improve HWF planning and forecasting, and to anticipate future skill needs and improve continuous professional development (see also in EC, 2013)55. Therefore, the Joint Action on European Health Workforce Planning and Forecasting between 2013-2016 aimed to strengthen collaboration and advance the issue of workforce planning by elaborating useful tools and collecting methods and good practices from EU MS, engaging the dialogues on related topics e.g. recruitment and retention policies (see also Recruitment and Retention Study, EC 201556). Building on the work undertaken by the Joint Action, the SEPEN Joint Tender “Support for the Health Workforce Planning and Forecasting expert network” aimed to continue to sustain the actions in the field of HWF planning and policies, as well as to foster cross- country collaborations and accelerating exchanges of increasing knowledge. Additionally, WHO dedicates also a high level commitment to HRH development by publishing strategic documents such as the WHO Global Code of Practice on the International Recruitment of Health Personnel (2010)57, the UN High-Level Commission on Health Employment and Economic Growth’s report (2016)58, the WHO Global strategy on human resources for health: Workforce 2030 (2016)59 and the WHO European Framework for action and the Toolkit for a sustainable health workforce in the WHO European Region (2018)60, or also by designating 2020 as the “International Year of the Nurse and the Midwife”. The 51 European Commission. (2005). Directive 2005/36/EC of the European Parliament and of the Council of 7 September 2005 on the recognition of professional qualifications. 2005/36 EC. https://eur- lex.europa.eu/LexUriServ/LexUriServ.do?uri=OJ:L:2005:255:0022:0142:en:PDF 52 Kovacs, E., Schmidt, A.E., Szocska, G., Busse, R., McKee, M., Legido-Quigley, H. (2014). Licensing procedures and registration of medical doctors in the European Union. Clin Med (Lond), 14(3), 229-238. doi:10.7861/clinmedicine.14-3-229. 53 European Commission. (2012). EU level Collaboration on Forecasting Health Workforce Needs, Workforce Planning and Health Workforce Trends – A Feasibility Study. Final Report. Retrieved from: https://ec.europa.eu/health/sites/health/files/workforce/docs/health_workforce_study_2012_report_en.pdf 54 European Commission. (2012). Action Plan for the EU Health Workforce. https://ec.europa.eu/health/sites/health/files/workforce/docs/staff_working_doc_healthcare_workforce_en.pdf 55 European Commission. (2013). Study concerning the review and mapping of continuous professional development and lifelong learning for health professionals in the EU. EAHC/2013/Health/07. https://ec.europa.eu/health/sites/health/files/workforce/docs/cpd_mapping_report_en.pdf 56 European Commission. (2015). Recruitment and Retention of the Health Workforce in Europe. Final Report. https://ec.europa.eu/health/sites/health/files/workforce/docs/2015_healthworkforce_recruitment_retention_frep_en.pdf 57 WHO. (2010). The WHO Global CODE of Practice on the International Recruitment of Health Personnel. https://www.who.int/hrh/migration/code/code_en.pdf?ua=1 58 WHO. (2016). High-level Commission on Health Employment and Economic Growth - Final Report of the Expert Group. https://apps.who.int/iris/bitstream/handle/10665/250040/9789241511285-eng.pdf?sequence=1 59 World Health Organization. (2016). Global strategy on human resources for health: Workforce 2030. World Health Organization. Retrieved from: https://apps.who.int/iris/bitstream/handle/10665/250368/9789241511131- eng.pdf?sequence=1 60 WHO. (2018). The toolkit for a sustainable health workforce in the WHO European Region. https://www.euro.who.int/__data/assets/pdf_file/0004/375547/WH11_TK_text_AW-2.pdf 21 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 constantly growing recognition in nurse leadership, and awareness raising aims to underline the essential contribution of nurses and midwives to care provision and achieving universal health coverage (WHO, 202061). 2.4.1. Contribution to the Annual Work Plan TaSHI addresses the Annual Work Programme 2020 of the 3rd EU Health Programme. The Programme underlines four objectives, among which the third one is to “Contribute to innovative, efficient and sustainable health systems” and it also emphasises explicitly its priority areas of “Health Workforce Planning and Forecasting”. More precisely, TaSHI responds to the call and challenges set by the “Support to reforms in health workforce field - Initiatives on task-shifting (Heading 1.2.1.1 of the AWP 2020)”. In addition, the latest SEPEN (2020) results on the mapping study provide an overview of the main characteristics and a detailed description of the HWF planning systems and policies in the EU (SEPEN, 202062). SEPEN highlighted the current and future challenges of HWF to tackle, which can be stratified into two main categories: 1) policy related issues of shortages of HWF supply and managing serious HWF imbalances including the high outflow of HWF; and 2) newly emerging challenges reported by the MS. These new challenges to be addressed are strengthening primary care and general practice, and the management of preventive and rehabilitation care also seems to be a recent challenge for several MS. Along with these, providing appropriate skill-mix and task shifting in primary care teams seems to be a significant concern in more MS, as well as the quality of care and incorporating digital health solutions and the support of advanced technology into daily scope of practice. HWF and related system challenges How TaSHI addresses the priorities Challenge Imbalances and TaSHI will carry out pilot projects in five implementation sites maldistribution of HWF - addressing task shifting and task sharing as core strategies in monitoring health labour combating HWF shortages and geographical imbalances. By market dynamics (e.g. task shifting and sharing, a cost-effective organisation, rapidly ageing population optimised care provision and services can be achieved and HWF, migration and contributing to higher efficiency, effectiveness and mobility patterns of HWF, sustainable management and planning of HWF. availability of data) WP4 will gather existing practices and collect tools and methods, which could be used in different MS to mitigate unequal distribution of the HWF stock, specialties or accessibility of health services. Task shifting can enable better coverage of services and workforces, even in remote or underserved areas. WP5 will summarise the lessons learned from case studies of the implementation pilots, identify guidelines on common minimum features and conditions for effective task shifting, and emphasise a set of evidence-informed recommendations for policy and organisational levels in order to increase HWF responsiveness and resiliency. TaSHI will deliver tangible and 61 WHO. (2020). State of the world’s nursing 2020. Report. https://www.who.int/publications/i/item/9789240003279 62 SEPEN. (2020). Mapping national health workforce planning and policy in the EU. Presented at the SEPEN webinar of July 24. Retrieved from: http://healthworkforce.eu/wp-content/uploads/2020/07/SEPEN_Webinar_24July_Final.pdf 22 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 validated tools and methods tested by the pilot implementation sites, which are scalable and transferable to diverse settings. TaSHI will provide technical expertise to support the development, implementation and monitoring of good practices, methods, tools, and support peer learning. The outcomes will improve knowledge and evidence on access to care in disadvantaged areas and reorganisation of care delivery. WP2 will provide visibility and dissemination of results to broad target audiences and engage stakeholders in fostering actions of HWF planning and reforms in the HWF field. Higher demand for new TaSHI will continue the investigation of current and future primary care models, challenges of HWF. In addition, TaSHI will aim to explore better-integrated and potential solutions and responses to these challenges at the more patient-centred pilot implementation sites. Important mission of TaSHI is to care, the rise of chronic improve cultural sensitivity and openness of HWF to more diseases, and emergence effective organisation of work and developed working of advanced technology environments (e.g. multiprofessional teamwork, in healthcare interprofessional education, collaborative practice etc.). WP4 will gather existing practices and collect tools and methods, which are already addressing the reorganisation of health systems, devoting a more prominent role for prevention and primary care, while reducing avoidable hospital admissions and providing treatment at the earlier stage of disease progression. In this WP, we will reveal practices linked to technology-enabled integrated care, and select digital health as a key enabler in prioritising patient empowerment, skill-mix optimisation etc. The outcomes of this WP will produce a curriculum on digital content, knowledge, skills and competencies. This will contribute to improved digital skills, tools and digital health solutions in, and strongly emphasise the role of e-health, big data, ICT, and artificial intelligence in reforming healthcare. The importance of interpersonal, management, and leadership skills development will be also reflected in the WP4 activities. WP4 will also formulate conclusions on the prognosed impact of skill-mix changes on the HWF, as well as new and vanishing professions. WP5 will test the collection of tools and methods, as well as the curriculum at the diverse implementation sites. WP5 Guidebook, a new tool will summarise and list all of the crucial components of upskilling and upscaling HWF with digital and more comprehensive transversal skills, and further methods and tools to be used when implementing task shifting at various settings. The set of recommendations will also highlight, by stakeholder types, the main actions, initiatives, roles and responsibilities for further HWF developments. 23 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 WP2 thereby will facilitate communication of results, as well as fostering peer learning e.g. by webinars and online events aiming to enhance knowledge transfer and exchange. Moreover, TaSHI will support health system reforms focusing on workforce policies by updating tools and methods of HWF planning. 2.4.2. Added value Areas – where to achieve Ways - how to achieve EU-added value EU added value Impact on target groups Supporting EU policies and stakeholder engagement - Strengthen free movement of persons and implementation of EU directives, particularly in connection with the 2005/36/EC and 2011/24/EU directives on the cross-border movement of health professionals and patients. These directives enable cross-border movements in obtaining or delivering care, therefore aim to harmonise minimum qualifications and competencies of professionals and care provision standards, as well as conditions for continuity of care within EU MS. TaSHI will work on curriculum and training material development that has some influence on transferable knowledge, skills and competencies of health professionals, therefore facilitating the mobility of knowledge as well. - Support the agenda for new skills and job opportunities, as well as a European contribution towards full employment and equipping people with the right skills for employment (COM (2010/0682 final 23 Nov 2010). Skill development is an essential part of activities in TaSHI, and the project will work towards increasing the employability of well-trained health professionals in Europe by producing useful materials on tools, methods and evidence. - Promote the voluntary uptake of health innovation and e-Health and facilitate cooperation on e-Health in the European Union (Regulation (EU) No 282/2014 of the European Parliament). The five implementation sites will execute pilots with well-defined objectives in task shifting and will utilise e-Health and digital health throughout the implementation. - As one of the main project outcomes, a comprehensive overview will benefit the target groups of the project, comprising recommendations on future skills required for a resilient HWF, as well as the prognosed changes in skill-mixes, and the new and vanishing professions. - TaSHI will facilitate the openness, flexibility, and cultural sensitivity of health professionals, which will better enhance the readiness and resiliency of the HWF. - Develop consultation mechanisms, and provide information for stakeholders and policy makers on topics where task shifting might be crucial. 24 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 - TaSHI also supports informed decision-making and preparation of recommendations at the European level, particularly in health system reforms focusing on workforce policies, access to care in disadvantaged areas and reorganisation of healthcare delivery. - Supporting the sustainability of the HWF by contributing to an effective HWF forecasting and planning at different levels, also keeping HWF planning on the agenda has long-term benefits for sustainability and cost-effective operation. Long-term effect and - Conducting analytical work is necessary to formulate, potential multiplier implement and assess policy projects at local, regional, national, effect, such as replicable, or international levels, towards which the project will transferable and significantly contribute. sustainable activities - Improving knowledge base for formulating and implementing HWF evidence-informed reforms tailored to the national settings enables uptake of actions. - Raising awareness of stakeholders, developing educational materials, and providing training (‘train the trainers’) ultimately supports the improvement of stakeholders’ capacity to use tools and methods, and to execute HWF development. - Providing technical expertise to support the development, implementation and monitoring of good practices, methods, tools - with an emphasis of transferability needs to be a core element of TaSHI and any EU project. The practical deliverables will support organisational (e.g. healthcare providers) and policy levels (e.g. Ministry of Health) in developing and strengthening different types of task shifting in different EU MS, e.g. adoption of digital health solutions to increase HWF productivity. - Presenting tangible, real-world experiences of the implementation sites and providing evidence for other MS/organisations are useful to start fostering task shifting initiatives. As a result of the project, TaSHI can result in a network of stakeholders ready to implement task shifting at various settings, which can also result in a multiplier effect on the long run by achieving transferability and cross-validation of implementation sites with different health system characteristics, and different levels of care. Dissemination and communication ensure the visibility of the TaSHI project at different levels in the EU - internationally, at national and sub-national levels. WP2 disseminates key messages and project deliverables in the topics of task shifting, as a significant strategy for HWF development. The project outputs and messages will be adjusted according to the specific target groups (e.g. use of layman terminology for materials targeting citizens and patients, meeting the needs of the beneficiaries and end-users). WP4 develops evidence-based, fit for purpose curriculum, training materials and practical knowledge on task shifting education and training. By developing a new training for task shifting covering and promoting transversal skills (e.g. 25 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 management and leadership, proficiency level, data protection and interpretation), cultural sensitivity, flexibility and readiness of the HWF, the HWF will be equipped with new knowledge and tools supporting the progressive development of health professionals and the working environment. As digital disruption impacts all levels of care, emphasis will be placed on skills required for an effective digital transformation. The provision of practical training for the implementation sites by WP4 ensures that the education tools are piloted in a real- world setting, enabling further adjustments when the project outputs will be extrapolated to a larger scale (e.g. national level training programme). Furthermore, the utilisation of online training methods will enable broad and sustainable outreach of the training for the HWF and other stakeholders. Achieving economies of scale, starting from the 5 implementation sites as pilots: WP5 is the core WP for planning, executing and evaluating on-site pilot implementations, which ensures and facilitates peer learning and knowledge sharing on existing practices in the EU. The five implementation sites have already emphasised initial needs for improvements, defined some objectives and showed interest towards different types of task shifting initiatives, and some good practices have been identified. The sites will carry out a wide range of activities along with a common methodology and framework of change. This will enable WP5 to gather valuable qualitative data and on-site experiences from different settings. The standardised 7 phases of the implementation ensures the development of the common minimum requirements, conditions, features, benefits and weaknesses of task shifting initiatives. Furthermore, experiences from real-world settings support developments in HWF by updating HWF planning tools, and also the improvement of stakeholders’ capacity to utilise tools and methods in their health reforms. The involvement of five implementation sites with a heterogeneous background - e.g. pilot countries with different health systems, different therapeutic areas and disease patterns, different levels of care - has an added value as it provides a multifaceted experience and also supports the scalability of the findings to other settings. Contribution to - TaSHI develops collaboration, promotes knowledge-transfer and complementarity, peer learning, exchanges good practices and cross-fertilisation of synergy and ideas across reform areas and different sectors. compatibility with - TaSHI avoids duplication with other EU-level actions - facilitating relevant EU and EU synergies with other projects funded under the different specific Member States policies topics of the present call “Support to reforms in health workforce and programmes, field” by e.g. organising joint webinars, or channelling the project including compatibility findings into existing repositories (e.g. EU Platform on Best with the European Practice Exchange) Platform on RD - Strengthening networking activities through the existing registration and the international networks of the consortium, also facilitating intersectoral synergies are further important activities of TaSHI. 26 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 European Platform on This mission supports exploring synergies of activities and Best Practice Exchange benefits from initiatives of various stakeholders engaged in task shifting. WP2 will contribute to a better understanding of task shifting and sharing in the EU, to the dialogue on different types of task shifting in use, and reveal existing good practices in different EU MS. By managing active communication and dissemination, WP2 contributes to the joint progress towards sustainable implementation of task shifting in Europe. 2.4.3. Pertinence of geographical coverage The geographical diversity of the members of the consortium enables a better understanding of disparities of the national- and regional dimensions in Europe. The Consortium partners are representing six of the EU/EEA Member States, including Estonia, Italy, Hungary, Lithuania, the Netherlands, and Norway. With the nationalities of partners from these MS, variations and differences of health care systems can be observed more effectively with regards to the implementation of task shifting. The different structures and compositions of health care systems, as well as the HWF, varying possibilities with regards to financial and human resources, as well as the different policies and regulations are all valuable observational aspects of the processes of task shifting and the implementation of such processes. Moreover, the ageing population, the ageing HWF, the rising needs and demand of primary care and better integrated care, and even the private and public nature of health care are all factors that provide valuable insight with regards to the limitations and possibilities the implementation of task shifting processes can bring about. 2.4.4. Context of the project work The complementarity of the partnership The consortium shows a strong willingness to deliver added value at EU-, national- and regional levels, to gather, disseminate and exchange knowledge on task shifting processes and practices, and to enable progress towards the implementation of task shifting for the HWF. The special value of the project Consortium lies in the practice-based professional partnership of members, as well as the well- established network of organizations with significant professional experience in the development and planning of HWF in various contexts. The above mentioned general and strategic objectives of the project, e.g, mapping practices and preparing recommendations, are high priorities for the Consortium members, and all of the partners can contribute by taking specific roles to reaching the goals effectively during the project duration. The partners from different backgrounds (academia, research, public administration, and health authority) have long-established engagement with their national level stakeholders in the field of HWF development. The involvement of partners as well as relevant stakeholders with various professional backgrounds is necessary for the effective implementation of task shifting processes on the EU level. There are already some existing good practices, for instance on the utilization of e-health solutions for more efficient healthcare in Estonia, digital upskilling and education programmes in Norway and Hungary, and task shifting and sharing processes in the Netherlands. The Netherlands is well-known about the high level of readiness and responsiveness towards the benefits of task shifting, while having extended experiences in the different types of task shifting among different health professional groups. Besides the Netherlands, Estonia and Lithuania incentivise nationwide uptake of new roles of 27 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 nurses, and nurse prescribing is also an extended right and role of public health nurses in Norway, and training for Advanced Practice Nurses is part of the master education in Norway. The master level training for Advanced Practice Nurses was also introduced in Hungary a few years ago. The Consortium members established strong collaborations in the course of previous EU-level actions and projects. For instance, NIVEL from the Netherlands has been involved in the Health Prometheus project, where Semmelweis University was the Work Package leader of data collection in HWF mobility. Further collaboration was strengthened during the Joint Action on European Health Workforce Planning and Forecasting, and the SEPEN Joint Tender. In the latter two EU actions, AGENAS and Semmelweis University played crucial roles in Work Package leading concerning HWF planning data and methodologies. AGENAS carried out feasibility studies and pilot projects in the Joint Action on European Health Workforce Planning and Forecasting in Italy, Portugal, Germany, and Romania, while Semmelweis conducted mapping studies in HWF terminology, mobility and planning data. Currently in SEPEN, AGENAS and Semmelweis University is involved in providing technical support and assistance for EU MS in HWF planning, in which they are providing tailored advice and guidance for Lithuania and Estonia. Partners of Estonia and Lithuania received targeted guidance on improvements of HWF planning in SEPEN, resulting in a detailed situation analysis of the current HWF challenges at the national level. The TaSHI project could mean a continuity of targeted HWF actions, and sustain the collaboration and also monitor the impact of all HWF developments in these partner countries. These examples already show strong engagement and collaboration of consortium members in the field of HWF development, on-site tailored interventions, exchange of expertise and disseminating and facilitating knowledge transfer. Therefore, all partners can identify their specific role and contribution to the TaSHI project to deliver experience and expertise to achieve project objectives. Context of WPs All relevant knowledge, information, and accessible good practices of the EU will be gathered as part of WP4 to consolidate the existing information needed for the effective implementation and utilization of task shifting processes in Member States. The general aim is to provide overarching, clear and coherent guidelines on the process of task shifting, its prospect and possibilities, and the effective utilization of resources for the most successful implementation. The guidelines will provide incentives for the legal and policy environment to overcome barriers and utilize the facilitators of the process of task shifting, as well as tools to incorporate such processes on the sectoral and occupational levels. The WP leaders come from various academic backgrounds with experiences of curriculum, training modules and course design, and development training materials. The project aims to provide a deliverable that benefits upskilling and upscaling the HWF and enable and foster capacity building. Training materials and curriculum are to be considered as prototypes to be used in specific modules of undergraduate or postgraduate academic programmes, or CPD training for professionally active HWF covering a high variety of health professions, (e.g. modules on transversal skills of HWF, effective management and leadership modules, or digital health courses for health professionals). The implementation WP5 of the process of task shifting requires careful and thorough guidance on different levels, including individual-, organizational-, and policy levels. The guidelines will aim to comprise all of these levels, thereby providing maximum knowledge and understanding. The case studies of the implementation sites, as part of WP5, will carry out proposed activities of task shifting to achieve the defined objectives and deliver informative, useful and transferable results. Careful implementation of task shifting and sharing processes will serve with valuable information with regards to implementing future objectives and results into everyday practice. WP5 will be led by a well- experienced partner, who has already consulted and coordinated technical assistance of on-site implementations in HWF development. 28 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 WP3 will aim to evaluate internally, while WP2 will aim to disseminate externally the TaSHI project. The WP3 evaluation will follow a systematic approach, including the definition of the evaluation strategy (initial evaluation plan, and sustainability plan), and WP2 will also follow its dissemination and communication plan in order to foster knowledge exchange and activate dialogue among relevant stakeholders and target groups. Such information and knowledge is vital in order to incorporate task shifting processes into daily practice while ensuring the utmost effectiveness as well as safety of patient care. Furthermore, it is essential that the target audience of the project is aware of the latest developments and active exchanges on the products in the field of task shifting. In the framework of WP3, the project aims to involve experts as “TaSHI Advisory Board” who can serve as key informants in the field and further communication and dissemination activities are conducted as part of WP2 about the most effective ways to reach the various target audiences. With regards to the aspect of change management and the cultural aspects of task shifting processes, The Change Management Process Model by Beckhard and Harris (1987) outlines a seven step process for implementing change. The model outlines the steps an organization needs to go through and navigate in order to transition from its present state to the desired outcome (Beckhard & Harris, 198763; Siegal et al., 199664). The model can serve as a good example on how to tackle and manage the changes task shifting can bring about in the health care provider sectors. Context of implementation pilots In the frame of the TaSHI project, 5 pilot implementation sites from 5 countries will participate with a variety of processes and system features, targeted actions at different levels and addressing different types of task shifting when facing current challenges in health systems and workforces. Partners of Estonia and Lithuania participated in the national exchanges in SEPEN tender and received targeted guidance on improvements of HWF planning – coordinated by AGENAS and Semmelweis-, which resulted in very detailed situation analysis of the current HWF challenges at national level. All partners have also ongoing initiatives linked to overcoming difficulties or maldistribution in care provision, including some practices of task shifting. Lithuania: The Lithuanian healthcare system faces several challenges in terms of HWF: ● Overall high number of service provision and doctor specialists, family physician’s services consumption without clear decrease in the number of amenable death rate; ● Uneven distribution of doctors, nurses in primary care across regions; ● Regional inequalities in service provision and service quality; ● Long waiting times, limited access to doctor specialists and GP’s. On the other hand, Lithuanian HWF structure has one of the highest densities of medical doctors, although the density of nurses is far below the EU and OECD average. This creates additional workloads on medical doctors, limits provision of low threshold health care services, creates high cost of basic service provision, limits access and creates queuing. The education system, payment structure over 63 Beckhard, R. and Harris, R. T. (1987), Organizational Transitions: Managing Complex Change, 2nd ed., Addison-Wesley, Reading, MA. 64 Siegal, W., Church, A.H., Javitch, M., Waclawski, J., Burd, S., Bazigos, M., Yang, T., Anderson‐Rudolph, K., & Burke, W. (1996). Understanding the management of change. Journal of Organizational Change Management, 9, 54-80. 29 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 the years devalues professional education and as a result attraction of nursing studies remains low, additionally retention of nurses to the healthcare system is not meeting country needs. High administrative burden, especially in primary care service provision, low IT skills of staff, creates high work overload for medical doctors and dissatisfaction with the health care system. Estonia: The situation of Estonian HWF can be described through the following bottlenecks: - lack of nurses (the ratio of nurses is 2/3 of EU average); - high proportion of doctors in retirement age (1/5 of working medical doctors are over 65); - unsystematic involvement of allied health professionals. As the country's education system can increase the number of nurses only marginally during following years and will struggle to provide replacement to retiring doctors (e.g family physicians and psychiatrists), the health care system is in need of a serious innovation to increase the quality and availability of the services. Task-shifting has a potential to increase efficiency, quality and accessibility in health care. Learning from positive practices of other countries and being supported by experts, the TaSHI project is expected to support the design and implementation of national HWF policy. Although Estonia has been a pioneer in task-shifting-to-digital solutions, other forms of task shifting may be underused. Strict regulations and organization of health care prohibit flexibility in providing services. Mixing different forms of task-shifting may provide flexible service provision especially in rural areas and enhance significantly service models that link primary care and hospital level health care. PoliS-Lombardia, Italy: PoliS-Lombardia is the regional agency supporting the policy-making actions of the Lombardy region in Italy. PoliS-Lombardia is also in charge of executing the training course for general practitioners (GPs), for hospital medical unit directors, and for hospital general managers. It also provides strategic continuing education for the HWF for the regional government. Lombardy healthcare system stands at the top of the range in Europe and probably is the most advanced in secondary care in Italy (Istat, 201965; PoliS-Lombardia, 201966). Nevertheless, the SARS- CoV-2 pandemic highlighted critical needs regarding organizational aspects mainly in primary care. At the national level, new important legislative initiatives have been established, e.g. a significant number of medical fellowships and 9600 nurses jobs (D.L.34/2020). At the regional level also, Lombardy government aims to seize the opportunity to review the entire healthcare system organization (D.L23/2020). The main goal is to empower the primary care in order to meet the same level of excellence displayed by the secondary care. Norway: In Norway, there are several initiatives for developing healthcare provision with the help of e-health and digital care solutions. For task shifting, two specific areas were selected, where we could maximize the benefits of task shifting to machines and between health professions, and reconsidering scope of practice due to telemedicine. 65 Istat (2019) ‘Bes 2019. Il benessere equo e sostenibile in Italia’. Roma, pp. 1–237. 66 PoliS-Lombardia (2019) ‘Rapporto Lombardia 2019’. Milano, pp. 1-428. 30 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 1) Wound care is typically built up by multidisciplinary teams, where home care nurses in collaboration with the general practitioner (GP) have the primary responsibility for treatment and follow- up of patients with ulcers in collaboration with the specialist health care service (Smith-Strøm et al, 201667). In the absence of access to a multidisciplinary team in the community, it has been shown that not all patients had an assessment of the underlying cause of the ulcer before nurses had to make a decision on local wound care (Smith-Strøm and Thornes, 200868). The pilot is focussing on wound care in the municipal health care system; supported by specialized services from outpatient clinic at the hospital using real-time video- communication. In Norway, only a few nurses in the municipality have formal wound care training, few nurses have experience from working in wound care clinics and the access to medical doctors for advice in wound care may be completely absent. 2) Teleradiography – Remote Computer Tomography for stroke diagnosing in rural areas: A project using telemedicine services in stroke diagnostics have been introduced this year. To have 24/7 service in the rural area is therefore an important issue to get those who are affected by stroke in the rural areas an equal service compared to those, who live in urban areas with easy access to a hospital. The Norwegian guidelines for stroke treatments states that if a patient needs thrombolysis treatment, this has to be started by 4,5 hours after symptoms started. A CT examination is important to decide if the patient is a candidate for thrombolysis (Helsedirektoratet, 201769). When non- radiographic professions are going to use X- ray machines, it will be important to make customized and good training to operate the machines to ensure the quality of the examination. The paramedic staff therefore need procedure training to do a good quality job. Training and regular maintenance of knowledge is an important management tool to facilitate. Cooperation and communication is also important for the radiographers, the paramedics and the junior doctors to ensure the quality of the examination and the treatment. Computer Tomography (CT) examinations are carried out by a radiographer at day time and in afternoons, at nights and weekends by paramedics. The paramedic staff performs the CT procedure using video link to the Ringerike hospital, where a radiographer guides and has remote control of the CT machine. The paramedic staff also conducts a neurological examination of the patient, which procedure is guided by a junior doctor also via video link. This exercise is a type of remote care and consultation and diagnostics is made digitally. The professional team decides about the diagnosis and if a thrombolytic treatment is needed, the paramedic staff will be guided to inject actilyse, and refers the patient to the hospital, located about 3 hours away. The Netherlands: Task shifting and taking over tasks from ophthalmologists shows an emerging practice in the Netherlands, which is due to the diffusion of optometric technology. On the other hand, however, barriers for this type of task-shifting are present and pending. One barrier is omission of a cost-effective tariff for optometrists to offer eye care without a commercial incentive to get the necessary equipment and ICT to purchase. Another barrier is that ophthalmologists see opportunities for task-shifting, but also strive for clear rules on ensuring the quality of ophthalmic care, agreements on legal responsibility, supervision and training. In addition, the domain battle between ophthalmologists and optometrists 67 Smith-Strøm, H., Iversen, M. M., Graue, M., Skeie, S., & Kirkevold, M. (2016). An integrated wound-care pathway, supported by telemedicine, and competent wound management—essential in follow-up care of adults with diabetic foot ulcers. International journal of medical informatics, 94, 59-66. https://pubmed.ncbi.nlm.nih.gov/27573312/ 68 Smith-Strøm, H., & Thornes, I. (2008). Patient Safety regarding Leg Ulcer Treatment in Primary Health Care. Nordic Journal of Nursing Research, 28, 29 - 33. https://www.semanticscholar.org/paper/Patient-Safety-regarding-Leg-Ulcer- Treatment-in-Smith-Str%C3%B8m-Thornes/cd5f014a63ea7992d486e58d76988d9a79627a6d 69 https://www.helsedirektoratet.no/tema/hjerneslag 31 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 is influencing the attention for case mix aggravation and associated financial arrangements are important to motivate ophthalmologists to (further) realize shifting of tasks. In the Netherlands, regional projects are ongoing in task shifting: 1) In the region of Twente, ophthalmologists and optometrists work together in optics shops, causing that the number of referrals has decreased considerably. In almost 80% of the less complex eye care demands, optometrists appear to be able to serve these independently instead of ophthalmologists. Since the start of the pilot, 2,000 people have already been referred by the GPs to the optometrist instead of the ophthalmologist. More than 400 of those patients were referred to the ophthalmologist, but the other 1,600 could be helped by primary care. This is considered as a ‘relief‘ for the ophthalmologists’’ workload and an advantage for the patients’ pathway that can go much faster. 2) Also in the region of Rotterdam, cooperation and task shifting practices between ophthalmologists and optometrists can be monitored for the TaSHI project. Considering the above, successful completion of the TaSHI project on the diverse pilot implementation sites will provide novel solutions, synthesized evidence, tools and methods tested for overcoming and mitigating some HR challenges and barriers by task shifting. 2.5. Methods and means When implementing the project, several methods and means will ensure the optimal and effective execution of activities. The project will benefit from qualitative and quantitative methods as well throughout the whole project duration, which are contributing to more reliable and valid results. The TaSHI project is divided into 5 WPs with a great level of interconnectedness. There are three horizontal WPs on “Project Management and coordination”, “Dissemination and communication” and “Evaluation”. These three WPs continuously feed each other's activities, also highly dependent on the vertical WPs. WP4 is focusing on the preparatory activities of implementation (WP5), and knowledge management. There will be parallel activities and tasks, therefore WP1 and WP leaders will have the responsibility to harmonise the activities relying on each other. Additionally WP1 can support the synergies of the diverse WPs. WP4 will produce deliverables to be used in WP5, and WP5 experiences and deliverables will be evaluated, and then incorporated into revised deliverables of WP4. In WP5, 5 implementation sites will pilot task shifting. These will concentrate on specific types of task shifting during the implementation of their pilots. The pilots will run and gather information based on the common methodology and evaluation, therefore conclusions can be drawn to benefit and upscale further implementations in EU MS. The TaSHI project will be evaluated internally by WP3, and intends to involve an advisory board to ensure external supervision. The messages and results of TaSHI will be disseminated EU-wide by WP2. Communication and continuous stakeholder involvement and engagement will mean a high priority. As the WP leader of WP2 has extended experience on network management and animation, activities e.g. organizing and running webinars and online dialogues will be a crucial part of knowledge sharing and exchanging information and evidence of different stakeholders, target groups. 32 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Overview of work packages WP1 will utilize Project Management methods and tools. In this WP we will involve the guidelines of PM2 Project Management Methodology of the European Commission. This methodology is transferable for a project like this and supports us to effectively coordinate and control the partner’s ongoing activities, monitor deadlines, deliver the planned outputs on time and keep up the working efficiency in the entire lifecycle of the project. WP2 will explore different potential means in communication and dissemination, also including a crucial stakeholder/target group mapping and analysis (see also Lewin force field analysis), which aims to map the different target groups in depth for the broad audience of dissemination. The stakeholder coverage evaluation tool from the Toolkit on Health Workforce Planning (designed by the Joint Action on European Health Workforce Planning and Forecasting) will support this task. The sustainability of the results will be considered here as well. The project will provide a platform for collaboration for HWF experts (potentially on the EU HPP specific “Health Workforce” forum) and foster the dialogue in various topics relating to HWF development. This WP will manage the stakeholders during the project. An interim evaluation will use a satisfaction survey method to increase the quality of dissemination and communication activities based on stakeholders’ feedback. WP2 foresees seven channels to be used during the TaSHI project, considering the synergies of the other funded projects under the specific topics of the call. 33 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Channel type Purpose of the Frequency/D Method of the Date of communication uration communication the activity Continuous information platform for the stakeholders TaSHI project Uploading news, M3-M36 and public of the website Continuous publications, events project, about the related to the project activity of the partners, outputs, events, developments Occasional communication tool Depends Partners websites Posts, short news, for the partner’s main Occasionally on pictures activities, project activities outcomes, events In order to Based on the communicate up-to- TASHI Project communicati date news, information Sendinblue - marketing newsletter on plan, 9 M1-M36 about the project communication software editions status, events, altogether outcomes Partners Share information Depends newsletters about the partner’s Occasionally Brief news on activity in the project activities EU HPP specific “Health EU HPP platform to Articles, short posts, Workforce” keep the stakeholders Continuous M3-M36 forum polls informed. Social media sites (linkedin; Attract attention and facebook, targeted calls for Occasionally Short posts, pictures M1-M36 twitter) actions 34 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 3-4 event Webinars / Joint Sharing experiences annually, webinars with and information by based on the Webinars, thematic related projects/Online online events in webinar workshops, online M1-M36 events synergies with other series, event events projects execution plan Share video Depends Youtube channel Recorded Video recordings, promoting on online events recordings/streamings videos of the project activities Face-to-face meetings Personal Conference Depends with the objective of appearance Occasionally participation, workshop on dissemination and attendance activities networking Rollup and leaflet Support presentations, Main information about production personal Occasionally M3 the project communication WP3 will develop and conduct an evaluation methodology for internal evaluation of the project run and provide indicators, which will measure and assess the impact of the activities carried out by the project. The “TaSHI advisory board” will be set up in order to ensure objective project evaluation and assessment of the impact of different activities. WP4 will use a research methodology, where desk research will employ different methods in order to collect and analyse concepts and implementation practices. The mapping exercise and the collection of good practices will be facilitated by USN and will be done through an academic literature review, EU project screening by using predefined keywords for exploring the most important projects, tools, concepts and previous findings. In addition, key informant interviews and partner’s contributions will result in a list of existing good practices. All partners will be invited to provide examples of the good practices on task shifting from their own experiences along the participatory design method. In addition, further methodology will be applied to establish education guidelines and develop practical training materials and curriculum. The KPP model is a generic educational model designed for continuing health education programs. The model shows how the learning resources, learning and assessment tasks are connected as a complete learning process, i.e. how learning and assessment should take place. Knowledge (K) can be tested and reviewed by self-assessment, reinforced by video resources, and assessed through formative assessment. Process (P) connects new knowledge with prior knowledge, a cognitive or practice-based framework, and can be enhanced through online facilitation or virtual classroom discussion. The learning is assessed formatively. Internships provide practice (P) experience and should be an essential part of shared learning, and is well suited for clinical practice and clinical audit. The assessment can be summative, such as a practice assessment. In essence: identification and processing of new knowledge, use of cognitive frameworks in ‘authentic’ or ‘situated’ learning environments, reflective and collaborative learning promote learning outcome 35 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 and competency by three key learning activity domains: knowledge acquisition (K), knowledge processing (P) and knowledge application in professional practice (P). The LOVU method enables in addition to the educational model, a platform and repository of learning resources to apply to achieve specific learning outcomes. Co-creation and sharing of learning materials related to common learning outcomes are key processes of LOVU methodology. WP5 will also use a complex set of methods for the 5 different implementation sites. There will be a common methodology to set the framework of the pilots and in order to provide some comparability of the diverse actions, and a common evaluation on the pilot results. The scope and the phases of the pilots will follow the same methodology, and then a variability of on-site experiences can add to the currently existing evidence. Inspiration from the Calderdale Framework70 will support the common methodology, e.g. use of Power Interest Matrix stakeholder analysis, OECD Assessment tool etc. The Expert Panel on effective ways of investing in Health (EXPH) of the EU Commission consulted in 2019 on task shifting and health system design recommended that “decisions to engage in task shifting should be planned carefully, taking full account of the implications both for the individuals concerned and for the wider health sector”. Moreover, they suggested one approach capable of guaranteeing those requirements, the Calderdale Framework, stated that “we see the elements contained within it as being important”. The Calderdale Framework (CF) is a 7-step process used to improve the way a healthcare team works. It provides a clear and systematic method for reviewing the team's skill-mix, developing new roles and new ways of working and linking these workforce changes to the redesign of the service to ensure safe and effective patient-centred care. The Calderdale Framework focuses on the workforce elements of a health care model, complementing the model with service redesign. The main principle of the Calderdale Framework is patient-centred care. The final goal of the Calderdale Framework implementation process is to develop a competency-based training program for healthcare professionals that ensures quality and patient safety while maximizing the capacity of the workforce. The Calderdale framework was developed by a team work in 2011, the Effective Workforce Solutions Ltd. Then, in the following years was successfully used in different health care settings in change management project regarding task shifting, multidisciplinary team building, skill mix design, etc. The framework proposes a stepwise approach that TaSHI will replicate in the different pilot sites, adopting a flexible implementation perspective, meaning that, based on the needs of each pilot site, TaSHI will go more in depth in specific steps of the framework. The original Calderdale Framework proposes also, for each step of the implementation path, some tools to support the implementers. But those specific tools are protected by copyright and can be used only by the Calderdale Framework Practitioners. Expected results include: 1) a comprehensive map of the functions and tasks provided by the team to deliver the service, 2) an analysis of the tasks determining whether each of them should be: (a) performed only by the profession(s) currently performing the task, (b) shared to one or more additional professions, or (c) delegated to an allied health care assistant or other support worker, 70 Smith, R., & Duffy, J. Developing a competent and flexible workforce using the Calderdale Framework. Int J Ther Rehabil, 17(5):254–262. https://www.magonlinelibrary.com/doi/abs/10.12968/ijtr.2010.17.5.47844 (https://www.calderdaleframework.com/ ) 36 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 3) instructions on support to provide the training, skills assessment and governance processes necessary to implement a task shifting initiative (sharing of skills or delegated practice) 4) an evaluation and monitoring process to incorporate the new way of working into regular practice. In summary, the successful completion of the TaSHI project will provide novel solutions for overcoming and mitigating some HR challenges and barriers by task shifting. After synthesizing the evidence and the lessons from the implementations, the problems and the solutions might be grouped together to better explore where task shifting could be the optimal solution. Specific Description of methods and means by objectives Objective ID 1) Mapping practices and developing tools - strengthening the knowledge on task shifting Deliverables ● Deliverable of Collection of useful tools and practices in task shifting ● Deliverable of Case studies of implementation sites ● Deliverable of Guidebook of task shifting Activities and tasks - List of methods and means ● Desk research (e.g. screening EU projects) ● Systematic literature review ● Participatory design of a list of existing good practices by consortium partners ● Interviews with key informants (semi-structured or focus-group, or Delphi) ● LOVU framework and KKP model ● Common methodology and evaluation of pilots ● Identification of phases inspired by the Calderdale Framework ● Power Interest Matrix stakeholder analysis ● Assessment by the OECD study Specific Description of methods and means by objectives Objective ID 2) Provide recommendations on training and upskilling - share and utilize experiences of implementation pilots on task shifting Deliverables ● Deliverable of Practical training materials and curriculum ● Deliverable of Set of recommendations for task shifting actions Activities and tasks - List of methods and means ● LOVU framework and KKP model ● Common methodology and evaluation of pilots ● Identification of phases inspired by the Calderdale Framework 37 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 ● Power Interest Matrix stakeholder analysis ● Assessment by the OECD study ● Collecting recommendations - validation by the implementers 2.6. Expected outcomes and benefits of the project The expected outcomes of this project can be differentiated by level (general and specific), type (product and process) and target group (stakeholders). Below, these three ‘dimensions’ are applied to categorize expected outcomes of the project. The expected outcomes will be aligned with the predefined deliverables and milestones as described in the ‘horizontal’ and ‘vertical’ Work Packages of this proposal. As the general expected outcomes of this project we distilled from the Call text the following four objectives: 1. Added value at EU, national and regional levels; 2. New knowledge on task shifting processes; 3. EU-wide dissemination and exchange of knowledge on task shifting processes; 4. Progress towards the implementation of task shifting processes for the HWF. Related to these four objectives, the specific objectives as described in the Call text can be classified as follows: Ad general outcome 1: Added value at EU, national and regional levels: ● Providing good practices for introduction of task-shifting – patient safety / HS performance; ● Providing recommendations on the impact of new skills, including digital tools, disease prevention, risk detection to provide aid in the reskilling of HWF, as well as future HWF. Ad general outcome 2: New knowledge on task shifting processes ● Identification and analysis of the concept and implementation of task shifting; ● Providing an update on existing tools to incorporate task shifting processes; ● Mitigate the effects of changing skill-mixes and competencies across sectors and occupational groups. Ad general outcome 3: Dissemination and exchange of knowledge on task shifting processes ● Implementing strategies and identifying good practices, facilitating the exchange of these concepts; ● Contribution to the EU specific “Health Workforce” forum, EU-wide dissemination of knowledge; ● Organizing seminars and thematic workshops to ensure joint reflection and enhancing knowledge and lessons learnt. Ad general outcome 4: Progress towards the implementation of task shifting processes for the HWF ● Development of practical guidelines for the public authorities and healthcare providers which will serve as the operational tools supporting their healthcare workforce policies in relation to challenges in these fields; ● Provide practical training and education materials; ● Developing curricula for digital, interpersonal, and management skills for physicians, nurses, pharmacists, and other HWF; 38 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 ● Provide recommendations for future HWF skills to aid better adaptation to new developments; provide aid in the upskilling of nurses, including digital skills, with the involvement of IT specialists. With regard to the stakeholders or target groups, these can be linked with the four general objectives as follows: Ad general outcome 1: the authorities and policy makers at the MS, national and regional level can be considered as the main target group. In particular, the alignment between these actors on the different geographical and policy levels is important to include in evaluating this outcome. Ensuring and acknowledging that the policy development and implementation, including that on task shifting processes, is not an exclusive domain for national authorities. Ad general outcome 2: new knowledge on task shifting processes - the current research and policy community in the EU and worldwide can be considered as the main target group. Ad general outcome 3: policy organisations and governing bodies that are responsible for, and research organisations working on task shifting in the EU MS can be considered as the main target group. These organisations are the ‘agents’ to disseminate the outcomes of the project, i.e. the new knowledge. Ad general outcome 4: progress towards the implementation of task shifting processes for the HWF - the health care providers (both professionals and organisations) can be considered as the main target group. Here, patient organisations and citizen representatives are also important target groups. To summarize the expected outcomes and relate it to the deliverables planned in this project on the one hand, and the benefits on the other, the next table is presented: Deliverable Outcome Benefit Increased number of improved Collection of useful tools and methods and tools for task The benefit of these ensure practices in task shifting useful methods and tangible shifting in the EU Case studies of tools for developing HWFs in Increased number of implementation sites EU MS, also increasing pilots/case efficiency and productivity of Guidebook of task shifting studies/initiatives/actions/pra the HWF for the long-term ctices on task shifting in the EU Enabling countries to develop and exchange Increased number of more sophisticated stakeholders and effective engaged/participated in the knowledge on task EU representing more EU MS shifting in the EU The case studies aim to Guidebook as a direct tool to summarize pilot experiences, be utilized for the which can be upscaled to implementation of task broader fields and countries shifting. by diverse stakeholders in the EU Enhanced readiness, flexibility and preparedness of the EU 39 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 HWF is expected in facing challenges and emergency situations Increased cultural sensitivity towards resiliency and organisational adaptation in the EU Increased number of Practical training materials experts/stakeholders The benefits of these enable and curriculum capacity building and participating in policy Set of recommendations for dialogues on task shifting in upskilling of HWFs in the EU task shifting actions the EU Action plans, Increased number of policy recommendations on diverse recommendations on task aspects of task shifting and shifting in the EU HWF development can Increased number of contribute to better coverage education programmes and and distribution of resources training materials in the EU in the EU Supporting health system reforms focusing on workforce policies, access to care in disadvantaged areas and reorganisation of healthcare delivery by case study experiences in the EU Supporting the sustainability of the HWF by contributing to an effective HWF forecasting and planning at different levels by updated HWF planning tools 40 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 2.7. Gantt Chart 41 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 2.8. Project management 2.8.1. Methods Project management and coordination carried out by the Semmelweis University, is in charge of enabling an efficient and supportive working environment for the partners where they are encouraged to perform and collaborate in order to keep the project schedule, produce deliverables and provide quality work. Semmelweis University will coordinate the work and planned activities in all WPs, and ensure the adequate infrastructure (e.g.: internal communication and monitoring platform) for fulfilling the workplan and quality delivery in the given timeframe. An internal interactive repository will be established for the partners in order to support the internal communication in the project. This repository will operate as a central document database/library and follows the different stages of documents and deliverables. This repository will follow data privacy and security regulations and be available only by authorisation with personal username and password for the project partners. 2.8.2. Governance, Roles, Responsibilities Roles and responsibilities are clearly defined for each WP, work package leaders are appointed and each partner agreed with the participation. The internal reporting system will allow the Project coordinator to follow and control the progress of the activities. FIGURE 5 - Governance of TaSHI Consortium Leader The Consortium Leader, acting as the project coordinator, is the highest decision making unit within the consortium. Its main responsibility is to ensure the correct implementation of the contract with the European Commission, and the Consortium Agreement (CA), being the primary contact point for all formal written and verbal communication with the European Commission on behalf of the consortium. The Project coordinator will clearly define roles and responsibilities, agree on deadlines in the Consortium Agreement, and apply a transparent monitoring system in order to follow up the work of the Consortium. Semmelweis will be also responsible for ensuring proper reporting according to reporting guidelines, requirements, and the timely delivery of these reports. Managing the legal, 42 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 contractual, ethical, financial and administrative control of the project with supporting documentation will be within the remit of Semmelweis. The Project coordinator is also responsible for the risk management of the project, which is intended to ensure the production of concrete and high-quality results in line with the project work plan, and ensure that standards and procedures are defined, applied and evaluated. Project support office A project support office is set up at the site of the project coordinator. The project support office consists of the project manager, a project assistant and a financial officer. The primary task of the project support office is to assist the coordinator in the financial, technical and administrative management of the consortium. It will supply advice, prepare documents, obtain information and documents from participants (and other parties). When necessary, the office will be expanded with a legal and/or ethics expert to support the coordinator or an independent third party will be consulted. The financial offices will assist the project coordinator in the budget monitoring and the financial reporting to the EC and will be available to the consortium for questions of a financial/budgetary nature. Work package leaders and other partners’ contribution All Work package leaders and Co-leaders collectively work with the project coordinator in ensuring that the objectives of the project as a whole are met. The appointed WP leaders for each WP, are primarily responsible for the coordination of the work, including the organisation of technical meetings as required, reporting work in progress to the project management at the regular monthly electronic WP Leader Meetings and the Executive Board Meetings every 6th month, preparation and submission of the technical deliverables and reporting (major) changes to the project plan. WP-leaders organise communication and exchange of knowledge and documents regarding their WP with the participant organisations and experts involved. In case of new insights or problems that require alterations in the planning and execution of activities, WP-leaders are responsible for proposing adequate changes within the WP schedule and possible reallocation of responsibilities and reporting it to the Consortium Leader. Problems that cannot be resolved within the WP are reported to the project coordinator, who will undertake appropriate actions to resolve the problem. Partners of the implementation sites will be responsible to report to the respective WP leader. TaSHI Executive Board Executive board meetings will be held every 6th month of the project, as a part of the regular electronic WP Leader meeting. The Executive Board consists of WP Leaders and involves the part time financial officer in charge of the financial management of TaSHI. TaSHI Advisory Board The advisory board plays a crucial role in WP3, the WP responsible for evaluation and quality assurance. The ‘TaSHI Advisory Board’ will consist of a minimum of five members from 5 different organisations, while considering the geographical coverage in the EU as well as the variety of health providers via health professional organizations. They are invited to join two to three online meetings per year, depending on the planning of all projects deliverables and milestones. The external experts will increase and improve the quality of TaSHI deliverables, and WP3 Leader will share the responsibility for ensuring a high quality of the WP deliverables. 8.2.3. Processes & Artefacts Processes for the whole duration of the project are summarised and visualised in a gantt chart, where each WP can check the dueness of the milestones and deliverables of the project. The Project Management organises monthly electronic WP leaders’ meetings, to ensure the progress of the work and handle the emerging issues. This is the most important internal forum to discuss any 43 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 issues within the project that allows the leading partners to oversee the project work and spread the responsibility. Beyond the electronic WP leaders’ meeting, some bi- and/or multilateral online meetings are also needed to improve the efficient work of the consortium. These meetings will be organised by WP leaders based on the project schedule before deliverables/milestones are due, or reporting needs more attention for certain WP or partner. After each meeting the minutes, action points and the urgent tasks of the partners will be summarised in a meeting minutes template and will be uploaded to the project’s meetings folder. In this reporting system project management will verify that the set deadlines will be kept. 2.8.4. Quality& Capacity of the partnership The partnership consists of governmental bodies, research institutes and academia, and healthcare providers, who are active in the field of HRH issues specifically at European and national and regional level. The consortium has a well-established working relationship and extensive knowledge-base from previous international projects, which brings added value from the project partnership perspective. The Project coordinator will drive the overall work plan and support the experts and follow up quality assurance processes that are put in place. The WP leaders will manage their resources and planning and report regularly on their achievements to the Project coordinator. Semmelweis University (SU) is the largest medical university in Hungary. The University has plenty of important experiences in participating in EU funded projects of the Health Programme. The institute Health Services Management Training Centre (HSMTC) is part of the Faculty of Health- and Public Services, and will be the coordinator of the TaSHI project. The HSMTC’s goal is to assist the development of health services in Hungary and on the international level by generating better management knowledge and practice. Through its activities HSMTC aims to generate learning and development opportunities, knowledge and new understanding for those who work on the improvement of healthcare and health services organizations. International cooperation and knowledge transfer has a dominant role in its activities. HSMTC is a member of several international professional organisations, such as the European Health Management Association (EHMA), European Institute of Innovation and Technology (EIT Health) and the European Health Property Network (EUHPN). The Centre has a strong collaboration among others with the World Health Organisation and the World Bank. In the framework of international development and research projects, the Centre is honoured to work together with the leading institutes and professionals of the world. As recent activities, HSMTC is actively involved in several national and international projects in the field of big data, healthcare digitalisation, artificial intelligence (AI) and change management. With regards to HSMTC’s experience in projects related to HWF, HSMTC was responsible for the Health PROMeTHEUS and ECAB FP7 research projects as WP leader; associate partner in the CHRODIS PLUS; partner in the Joint Actions to support the e-health network and for European Health Workforce Planning and Forecasting. Having significant experience in the Human Resources for Health (HRH) field both at national and at international level, HSMTC is currently leading the consortium of the ‘Support for the Health Workforce Planning and Forecasting Expert Network‘ SEPEN joint tender. The key objective of the three-year duration tender is to support and strengthen the cooperation of experts in the field and to disseminate and share the constantly accumulating knowledge. This tender has become an important driver for expertise and knowledge sharing in the HWF field, and it also focuses on collecting research evidence and experience of Member States, and supports improvements and implementation of HWF development in the EU. Semmelweis University is furthermore a WHO Collaboration Centre (WHO CC) in HRH Development. The centre was appointed in 2015 and the WHO CC title re-designated in 2018 for the second 4 years’ 44 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 mandate. The institute is committed to represent the professional program of the WHO in the European Region as well as supporting the professional research and educational tasks in the following main areas: research and publication activities, dissemination and knowledge exchange, professional expertise and guidance, supporting the professional program on the regional and global level, and teaching and training activities, and event organisation. These days for instance, our WHO CC is working together with three other WHO CC’s globally in designing targeted HRH Leadership and Management Training Courses (shorter training and master level programmes). In connection with digital upskilling of the HWF, HSMTC led a consortium with partners of Universidad de Navarra, IESE Business School and E-Group in a summer school programme funded by EIT Health. L-ead Summer School “Leveraging e-health workforce by advanced skills” aims to generate awareness raising and knowledge sharing about changes of healthcare systems in the digital age. With the help of change management and evidence-based policy making, participants will understand the functioning of health systems, the context and rationale of workforce development. HSMTC ran the programme face-to-face in 2019 and online in 2020. The Italian National Agency for Regional Healthcare Services - AGENAS As required by its institutional role, AGENAS is committed to monitor the health system and contribute to enhance its performances. As partner of the Task Shifting proposal, that aims to support EU Member States in designing and implementing their policies related to healthcare workforce task-shifting, can give its contribution through two types of action: A methodological, due to the great experience of AGENAS in relevant European projects as: - Joint Action on European Health Workforce Planning and Forecasting coordinated by Belgium and funded by the third EU Health Programme, brought together knowledge and expertise on HWF from all over Europe. This group of experts, including AGENAS’, has produced Handbooks and Guidelines, describing the most advanced planning methodologies of 7 countries. AGENAS oversaw the pilot- testing in Italy with a feasibility study running in Germany. - SEPEN call for tender Support for the hEalth workforce Planning and forecasting Expert Network: it is a project with the aim to sustain cross-country cooperation and provide support to Member States to increase their knowledge, improve their tools and succeed in achieving a higher effectiveness in HWF planning processes and policy. AGENAS , together with the Italian Ministry of Health, has the role of leader of the Work Package 4; it is engaged in providing support to member states (MS) about, not only a better understanding of available data in their territory, but, above all, HWF planning according to their request. Moreover, AGENAS is part of the SEPEN team which is organizing an online technical workshop entitled “Digital health: what are the implications for supply, demand, monitoring and organisation of health workforce?”. It deals with the impact of the development of digital technologies and information technology on the current and future HWF, it will be characterized by a great interactivity as all the participants will be able to give their contribution in sharing their knowledge and proposing solutions to the problems discussed. - Joint action on implementation of digitally enabled integrated person-centered care - JADECARE whose goal is to reinforce the capacity of health authorities to address all the important aspects of health system transformation successfully, in particular the transition to digitally enabled, integrated, person-centered care to support the best practice transfer from the systems of the “early adopters” to the “next adopters”. AGENAS represents the Competent Authority for Italy and, above all, it is Co- leader of Work Package 4 with the specific role to support “next adopters” of each JA partner for the implementation in their territory of the selected best practices. - A technical, as the task shifting interventions can also materialize in the development of training courses for healthcare personnel, in which AGENAS has acquired a great experience through ECM 45 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 (Educazione Continua in Medicina - Continuing Medical Education): it is a national programme of training activities, active in Italy since 2002. The ECM provides the maintenance of a high level of knowledge related to health theory, practice and communication; it includes training of health staff and regulatory development courses. Moreover, an important role has been recently assigned by the Italian government according to the last Finance Law, as AGENAS has been involved in the “National Observatory for the specialized health training” with the aim to support the National Healthcare System to define the needs of doctors and healthcare professionals. Netherlands Institute for Health Services Research - NIVEL NIVEL, Netherlands institute for health services research, is the national institute for health services research in the Netherlands. More than 150 researchers are active in the multidisciplinary field of health services research that examines how health systems, structures and processes affect access to health care, the quality and costs of health care. HWF research has been conducted by NIVEL since its foundation in 1975, in particular by model development for HWF planning and forecasting. Task shifting and substitution are studied in different health sectors to support policies on an operational, tactical as strategic level. The Ministry of Health of the Republic of Lithuania – MOH-LT The mission of the Ministry is to form and implement health policy that ensures public health, high quality health promotion activities, and rational use of resources - in compliance with the requirements of EU regulations. In addition, the Ministry of Health is responsible for the supervision of healthcare service provision, prevention and control of diseases, and improvement of the population health. In order to achieve the above mentioned goals, the Ministry is taking part in a number of projects also in EU-financed actions and has a deep understanding and vast experience in EU projects. Estonian Ministry of Social Affairs – SM-EE One role of the Ministry of Social Affairs is to plan and implement the health care policy. Health System Development Department (HSDD) is a unit of the Ministry responsible for health care policy development to ensure availability, quality, and safety of health care and guarantee the awareness of and satisfaction with health services among residents. This project is expected to support the design and implementation of national HWF policy as smart task-shifting has a potential to increase efficiency, quality and accessibility in health care. Mixing different forms of task-shifting may support flexible service provision, especially in rural areas and enhance significantly service models that link primary care and hospital level health care. University of South-Eastern Norway - USN The Faculty of Health and Social Science (HS) at the University of South-Eastern Norway includes committed professionals with extensive experience. In addition to professional study programs, we offer a number of master degree programs, including: Anaesthesia and Intensive Care, Preventive Work with Children and Young People, Health Promotion, Midwifery, and Optometry, as well Radiography- and the master course "Justification and skill-mix in radiology". USN also offers a PhD programme in person-centric research. The faculty offers tailor made courses, studies and research in line with society's needs for increased knowledge. The program offering is developed in collaboration with the business community. USN has extensive experience in development of supporting tools – guidelines, scaling up of good practices, creating a platform for policy dialogue to advance regional research. 46 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 The Faculty of Health Sciences develops programs for person-centered and multidisciplinary healthcare with a special focus on primary health care and through digital transformation, which is enabled through the Science Centre for Health and Technology (Science Centre), a cross-faculty and interdisciplinary research centre, hosted by HS. The Science Centre has already established itself as an internationally and regionally preferred partner in the field of (e)health innovation and communication research. It has a real multidisciplinary approach with members coming from different disciplines within health services research. The Science Centre is actively involved in the region, serving as an innovation partner for municipalities, hospitals, small and medium enterprises, and third sector organisations. In addition, the Science Centre educates for person-centred innovation at the intersection of healthcare, digitalisation and technology. The Center's interdisciplinary educational program brings research into practice, and conversely, brings practice into research. The Centre has facilities for testing and simulations of new models of collaboration and service delivery in addition to training facilities for students and practitioners. The Science Centre cooperates with national and international researchers and actors in the primary and specialist health services around research on health services and clinical health care. PoliS-Lombardia PoliS-Lombardia is an agency that supports the policy setting process of the Lombardy region. It provides support for integrated education, training and work policies, in line with the objectives set by the Directorate-General responsible for education, training and work. It is in charge of the training course for general practitioners (GPs), hospital medical unit directors and hospital general managers. It also provides continuing education for the healthcare workforce for the regional government (approximately 80 events per year for 3000 participants). PoliS-Lombardia is doing research activities with the aim of providing scientific support for the definition, implementation, evaluation and monitoring of regional policies. PoliS-Lombardia has substantial experience in the training of healthcare professionals and it is deeply connected to regional and national professional associations Orders, Universities and primary and secondary care. 2.8.5. Capacity of the staff Semmelweis University The Team of Semmelweis University in the TaSHI project will be composed of at least seven experts. The team of the “Human Resources for Health Development Knowledge Centre” of HSMTC has been participating in projects collecting, analysing and reporting HRH-related data for more than twenty years. In addition to research, our institute is consulting with health policy makers in different levels in supporting and planning actions for HWF development and policy. Most members of the team are currently involved in the SEPEN activities of communication and dissemination, which ensures experience in implementing EU funded projects in the specific topic of HWF. Two senior experts, who are highly experienced in the field of HWF research, managing planning and forecasting projects, and have many years of experience in EU level project design and implementation. They will act as project leader and scientific leader of TaSHI. The team will involve furthermore two full time researcher colleagues, one communication expert and one communication assistant, one project coordinator, and one financial officer. The communication expert is leading currently all external communication and dissemination processes of our institute in different projects, and has many years of experience in the PR field and has a communication team. The Italian National Agency for Regional Healthcare Services The AGENAS Team involved in TaSHI, is composed of an expert collaborator and 2 full time permanent employees under the direction of a head of Research and International relations Department office. 47 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 The expert collaborator is a senior project manager, with experience on health care projects at regional, national, EU level and a specific expertise in health care organization and HWF planning and management. The Chief of the office is a Medical Director with a strong experience in Epidemiology of infectious diseases, Emerging infections and revisioning and monitoring of clinical networks and organizational development. Competences of the team dedicated to the Joint Action include long-standing experience in the area of EU and national projects, commitment to enhancing international cooperation and exchanging best practices, research abilities, proficient command of writing and translation in English and other European languages (French, Spanish, German, Portuguese). Specific studies and working experiences include both national and international relations and economics and organization of governmental agencies and enterprises. Netherlands Institute for Health Services Research The head of the project at NIVEL is a leading PhD researcher and Professor in Health Workforce and Organisation Studies at the Radboud University Nijmegen. He will lead WP3. He was coordinator of the EU project ‘Core Competences of Healthcare Assistants in Europe’ (CC4HCA) in 2015-2016, active member of the SEPEN network and (formerly) the Joint Action on European Health Workforce Planning and Forecasting on behalf of the Netherlands. He worked as a scientific consultant for WHO on the development of the National Health Workforce Accounts (NHWA). Currently he is president of the Special Interest Group (SIG) on the Health Workforce of the European Health Management Association (EHMA), and vice-president of the European Public Health Association section (EUPHA) on Health Workforce Research. At NIVEL, he coordinates the development, application and governance of the mathematical HWF planning model for physicians, paramedics and specialized nurses. He is an editorial member of several national and international journals and authored more than 100 papers and reports on health policy, systems, organisation and workforce. The Ministry of Health of the Republic of Lithuania Project leader – Advisor to the Minister of Health of the Republic of Lithuania. Senior expert A – Assistant to the Minister of Health of the Republic of Lithuania. The Assistant works with healthcare workforce planning and forecasting topics. Also, she was working in project No. 08.4.2- ESFA-V-617-01-0001 and was participating in project No. 10.1.2-ESFA-V-916-01-0013, and was working with the Government Strategic Analysis Center on creating the Model for Forecasting the Demand of HWF in 2018. As well, she attended SEPEN workshops in Hungary and Belgium, and coordinated collaboration between the Ministry of Health of the Republic of Lithuania and SEPEN. Senior expert B – General practitioner who works at the Hospital of Lithuanian University of Health Sciences. Senior expert C - Psychiatrist who works at the Hospital of Lithuanian University of Health Sciences. Estonian Ministry of Social Affairs There are two staff members of the Ministry contributing directly to this project. Head of HSDD is an acknowledged health policy expert who has 20+ years of experience in the sector. In this project he will mainly act as an advisor on planning the country's task-shifting case. A senior specialist of the same department who is coordinating HWF policy in the Ministry has over 10 years of experience in the field of health care policy. He has worked as health policy analyst and policy designer, including in collaborations focusing on Estonian HWF policy. His main role in this project will be coordinating 48 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 communication with international team and Estonian partners and coordinating implementation of local task-shifting cases. The key staff members will be supported by other specialists and advisers of the same department (e.g coordinators of primary care, health insurance policy etc), and colleagues from the Smart Development Department (responsible for e-health developments). University of South-Eastern Norway The key team from University of South-Eastern Norway will be lead by a professor of Faculty of Health and Social Sciences, who covers areas of expertise in person-centred communication, how welfare- technology and e-Health can improve healthcare and patient care (including task shifting and new ways of service delivery), and innovation and implementation as well as transformation of services in digital wound care. Other members bring extensive research in person-centred care, co-creating healthcare and digital transformation of healthcare, as well as healthcare management and leadership. Further, expertise and development of curricula in radiography, radiological services in rural areas, as well as extensive expertise in advanced clinical nursing, development of the nursing profession and task shifting processes in radiology. In addition to international collaborations, the team collaborates within a broad regional ecosystem for health innovation and health services research, such as Municipalities, Regional Councils and Networks of Municipalities, The Regional Hospital Trusts, Local Hospitals, Local Medical Centre, Local Companies and Chambers of Commerce and Industry, User and Patient Organizations and Professional Associations, and Research Council of Norway. PoliS Lombardia Director of Academia (PoliS-Lombardia) The director is in charge of the three-year full-time training course for general practitioners (GPs) which involves the participation of approximately 700 trainees per year, along with the training for directors of hospital medical units (four-month training), and hospital general managers (six-months training). He is also in charge of the strategic continuing education for healthcare workforce for the regional government (approximately 80 events per year attended by 3000 participants). His decennial experience in education and regional politics is crucial in the process of reviewing the regional primary healthcare system. Fellow of Academia The fellow is in charge of a project regarding task-shifting in primary healthcare in the Lombardy region. Her qualifications include a background in biotechnology, a PhD in bioethics, and experience in clinical ethics consultation. Her cross-cutting experience in the medical field helped her gain perspective regarding the needs of the healthcare workforce. 2.8.6. Financial management The Coordinator will appoint a part time financial officer to be in charge of the financial management of TaSHI. This officer will be responsible for TaSHI financial reporting and budgetary issues, and will support associated partners in the preparation of their institutions’ reports. Each partner will, in turn, provide a contact person to liaise with the financial officer for all financial matters. In addition, the financial management will be included always as a point in the agenda of all TaSHI Executive Board meetings. The required Interim and Final Financial Reports will serve as a base for the Coordinator and WP leaders to have an overview of the budget and expenditure on a regular basis. The Financial officer will also collect data on expenditures and working time contributions by WP, and partners within them, 49 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 every six months. These data will be returned to WP leaders for adjustment of their activities, plans and budget distributions, as appropriate, adjustments that will be agreed with the governing bodies. There is double control, as the Coordinator monitors the budget execution both by WP and by individual partners. Detailed financial rules will be included in the consortium agreement as standard operation procedures to be agreed among the partners. 2.9. Budget 2.9.1. Content description and justification The consortium of the project is composed of 1 partner as coordinator plus 6 other partners. After the definition and agreement on objectives, purpose and deliverables of horizontal and core WPs and their corresponding tasks, participants indicated their skills and desired contributions to the different tasks, and the corresponding number of PMs they could allocate to the project over its entire duration. Budget distribution in terms of percentage is 90.37% for personnel costs and 3.08% for other direct costs, (including travels and subsistence and other goods and services). The remaining 6.54% are for the indirect costs, calculated, as per CHAFEA rules, to be 7% of the direct costs. When calculating the other direct costs, the consortium preferred to use mainly online communication channels, it is the reason for its low share of the total costs. The status of PoliS-Lombardia is unique in the TaSHI project, as they requested no EU contribution for their participation, and they resigned their share, which were distributed among partners. Not all the beneficiaries have the same division of national and EU contribution, as PoliS-Lombardia resigned of its EU contribution, so the share of other partners has been increased to 66 % EU contribution. 50 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 2.9.2. Detailed budget Applicant No. & Short Name 1. SU (If affiliated entity: Affiliated to which Applicant number/Short name) (A) Direct personnel costs Staff function Monthly Cost Estimated Sum Cost (€) Person-month project manager WP1 3600 15,1 54356,4 financial officer WP1 3200 5,0 16000 communication expert WP2 3600 18,54 66744 researcher WP3 3600 0,78 2804,4 researcher WP4 3600 7,73 27820,8 researcher WP5 3600 3,09 11106 Total person Total Costs (€) for month (A) 50,23 178 832 Justification WP1 and WP2 leader; WP3, WP4 and WP5 participant (B) Direct costs of sub- Costs (€) Task(s)/Justification contracting Total Costs (€) of (B) (C) Other direct costs (C.1) Travel Costs (€) Justification 3000 Travel to kick-off in Brussels and closing conference in Rome. (C.2) Equipment Costs (€) Justification 51 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 (C.3) Other goods and services Costs (€) Justification 1500 Dissemination materials - website, printed materials, publication costs. Total Costs (€) of (C) 4500 (D) Indirect Costs Total Costs (€) (Max. 7% on A, B and C) 12 833,24 Total estimated eligible costs 196 165,24 Applicant No. & Short Name 2. Agenas (If affiliated entity: Affiliated to which Applicant number/Short name) (A) Direct personnel costs Staff function Monthly Cost Estimated Sum Cost (€) Person-month Project Manager 5194 2,34 12133,18 Medical Doctor 11869 4,41 52342,29 Administrative staff 2645 0,4 1058 Researcher 4274 2,0 8548 Total person Total Costs (€) for month (A) 9,15 74 081 Justification Project manager will coordinate all AGENAS activities Medical Doctor will be in charge of coordinate AGENAS scientific activities especially regarding WP4 supported by the Researcher Administrative staff will care monitoring AGENAS expeditures and financial reporting Researcher will support the Medical doctor in the coordination of AGENAS scientific activities (B) Direct costs of sub- Task(s)/Justification contracting 52 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Total Costs (€) of (B) (C) Other direct costs (C.1) Travel Costs (€) Justification 500 Travel to kick-off in Brussels and closing conference in Rome 1000 WP5 travels (C.2) Equipment Costs (€) Justification (C.3) Other goods and services Costs (€) Justification Total Costs (€) of (C) 1500 (D) Indirect Costs Total Costs (€) (Max. 7% on A, B and C) 5 290,67 Total estimated eligible costs 80 871,67 Applicant No. & Short Name 3. NIVEL (If affiliated entity: Affiliated to which Applicant number/Short name) (A) Direct personnel costs Staff function Monthly Cost Estimated Sum Cost (€) Person-month Senior researcher and 8200 6,87 56317,6 coordinator Senior researcher 8000 4,63 37024 Mid level researcher 6800 1,71 11634,8 Total person Total Costs (€) for month (A) 13,21 104 976 Justification Leading WP3, co-leading WP4 and WP5 and contributing to the other WPs. Senior staff takes supervisory and coordinating role. 53 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Mid-level researchers responsible for carrying out work along set lines and directing junior staff in their work. (B) Direct costs of sub- Task(s)/Justification contracting Total Costs (€) of (B) (C) Other direct costs (C.1) Travel Costs (€) Justification 3000 Travel to kick-off in Brussels and closing conference in Rome. 200 WP5 travels (C.2) Equipment Costs (€) Justification (C.3) Other goods and services Costs (€) Justification Total Costs (€) of (C) 3200 (D) Indirect Costs Total Costs (€) (Max. 7% on A, B and C) 7 572,32 Total estimated eligible costs 115 748,32 Applicant No. & Short Name 4. MOH LT (If affiliated entity: Affiliated to which Applicant number/Short name) (A) Direct personnel costs Staff function Monthly Cost Estimated Sum Cost (€) Person-month researcher WP1 3453 0,78 2686,89 researcher WP2 3453 0,46 1602,19 researcher WP3 3453 0,78 2689,89 researcher WP5 3453 11,59 40027,18 54 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Total person Total Costs (€) for month (A) 13,61 47 009 Justification Detailed staff effort per WP (B) Direct costs of sub- Costs (€) Task(s)/Justification contracting Total Costs (€) of (B) (C) Other direct costs (C.1) Travel Costs (€) Justification 3000 Travel to kick-off in Brussels and closing conference in Rome. 200 WP5 travels (C.2) Equipment Costs (€) Justification (C.3) Other goods and services Costs (€) Justification Total Costs (€) of (C) 3200 (D) Indirect Costs Total Costs (€) (Max. 7% on A, B and C) 3 514,63 Total estimated eligible costs 53 723,63 55 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Applicant No. & Short Name 5. SM EE (If affiliated entity: Affiliated to which Applicant number/Short name) (A) Direct personnel costs Staff function Monthly Cost Estimated Sum Cost (€) Person-month researcher WP1 3410 0,78 2656,39 researcher WP2 3410 0,46 1582,24 researcher WP3 3410 0,78 2656,39 researcher WP5 3410 8,51 29008,87 Total person Total Costs (€) for month (A) 10,53 35 904 Justification Detailed staff effort per WP (B) Direct costs of sub- Costs (€) Task(s)/Justification contracting Total Costs (€) of (B) (C) Other direct costs (C.1) Travel Costs (€) Justification 3000 Travel to kick-off in Brussels and closing conference in Rome. 200 WP5 travels (C.2) Equipment Costs (€) Justification (C.3) Other goods and services Costs (€) Justification Total Costs (€) of (C) 3200 (D) Indirect Costs Total Costs (€) 56 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 (Max. 7% on A, B and C) 2 737,28 Total estimated eligible costs 41 841,28 Applicant No. & Short Name 6. USN (If affiliated entity: Affiliated to which Applicant number/Short name) (A) Direct personnel costs Staff function Monthly Cost Estimated Sum Cost (€) Person-month researcher WP1 7927 0,35 2742,74 researcher WP2 7927 0,21 1632,96 researcher WP3 7927 0,35 2742,74 researcher WP4 7927 6,87 54450,56 researcher WP5 7927 3,78 29971,99 Total person Total Costs (€) for month (A) 11,55 91 541 Justification Detailed staff effort per WP (B) Direct costs of sub- Costs (€) Task(s)/Justification contracting Total Costs (€) of (B) (C) Other direct costs (C.1) Travel Costs (€) Justification 3000 Travel to kick-off in Brussels and closing conference in Rome 200 WP5 travels 57 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 (C.2) Equipment Costs (€) Justification (C.3) Other goods and services Costs (€) Justification 500 E-education materials, online tools for material development. Total Costs (€) of (C) 3700 (D) Indirect Costs Total Costs (€) (Max. 7% on A, B and C) 6 666,87 Total estimated eligible costs 101 907,87 Applicant No. & Short Name 7. PoliS-Lombardia (If affiliated entity: Affiliated to which Applicant number/Short name) (A) Direct personnel costs Staff function Monthly Cost Estimated Sum Cost (€) Person-month researcher WP1 8100 0,35 2802,6 researcher WP2 8100 0,21 1668,6 researcher WP3 8100 0,35 2802,6 researcher WP4 8100 2,06 16718,4 researcher WP5 8100 3,78 30626,1 Total person Total Costs (€) for month (A) 6,74 54 618 Justification Detailed staff effort per WP (B) Direct costs of sub- Costs (€) Task(s)/Justification contracting Total Costs (€) of (B) 58 TaSHI - proposal No. 101018346 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 (C) Other direct costs (C.1) Travel Costs (€) Justification 500 Travel to kick-off in Brussels and closing conference in Rome. 200 WP5 travels (C.2) Equipment Costs (€) Justification (C.3) Other goods and services Costs (€) Justification Total Costs (€) of (C) 700 (D) Indirect Costs Total Costs (€) (Max. 7% on A, B and C) 3 872,26 Total estimated eligible costs 59 190,26 59 Grant Agreement number: 101018346 — TaSHI — HP-PJ-2020-2 ESTIMATED BUDGET FOR THE ACTION Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Estimated eligible1 costs (per budget category) EU contribution Action's estimated receipts Financial B. Direct D. Indirect Reimbursement Maximum EU Maximum Income contributions A. Direct C. Other Action’s costs of Total costs generated given by third personnel costs direct costs costs2 rate %3 contribution4 grant amount5 total receipts subcontracting by the action parties to the beneficiaries A.1 Employees C.1 Travel (or equivalent) C.2 Equipment A.2 Natural persons under C.3 Other goods direct contract and services and seconded persons Cost form6 Actual Actual Actual Flat-rate7 7% d= a b c e = a+b+c+d f g=e*f h i j k=i+j 0.07 * (a+b+c) 1. SU 178 832.00 0.00 4 500.00 12 833.24 196 165.24 60.00 117 699.14 129 567.00 0.00 0.00 0.00 2. AGE.NA.S 74 081.00 0.00 1 500.00 5 290.67 80 871.67 60.00 48 523.00 53 375.00 0.00 0.00 0.00 3. NIVEL 104 976.00 0.00 3 200.00 7 572.32 115 748.32 60.00 69 448.99 76 394.00 0.00 0.00 0.00 4. MOH-LT 47 009.00 0.00 3 200.00 3 514.63 53 723.63 60.00 32 234.18 35 458.00 0.00 0.00 0.00 5. SM-EE 35 904.00 0.00 3 200.00 2 737.28 41 841.28 60.00 25 104.77 27 615.00 0.00 0.00 0.00 6. USN 91 541.00 0.00 3 700.00 6 666.87 101 907.87 60.00 61 144.72 67 258.00 0.00 0.00 0.00 7. PoliS- 54 618.00 0.00 700.00 3 872.26 59 190.26 60.00 35 514.16 1.00 0.00 0.00 0.00 Lombardia Σ consortium 586 961.00 0.00 20 000.00 42 487.27 649 448.27 60.007 389 668.96 389 668.00 0.00 0.00 0.00 1 See Article 6 for the eligibility conditions. 2 The indirect costs claimed must be free of any amounts covered by an operating grant (received under any EU or Euratom funding programme). A beneficiary that receives an operating grant during the action's duration cannot claim any indirect costs for the year(s)/reporting period(s) covered by the operating grant (see Article 6.2.D). 3 See Article 5.2 for the reimbursement rate. 4 This is the theoretical amount of the EU contribution, if the reimbursement rate is applied to all the budgeted costs. This theoretical amount is capped by the 'maximum grant amount'. 5 The 'maximum grant amount' is the maximum grant amount decided by the Agency. It normally corresponds to the requested grant, but may be lower. 6 See Article 5 for the cost forms. 7 Flat rate : 7% of eligible direct costs. Page 1 of 1 Grant Agreement number: 101018346 — TaSHI Associated with document Ref. Ares(2021)1431961 - 23/02/2021 ANNEX 3 ACCESSION FORM FOR BENEFICIARIES AGENZIA NAZIONALE PER I SERVIZI SANITARI REGIONALI (AGE.NA.S), established in VIA PUGLIE 23, ROMA 00187, Italy, (‘the beneficiary’), represented for the purpose of signing this Accession Form by the undersigned, hereby agrees to become beneficiary No (‘2’) in Grant Agreement No 101018346 (‘the Grant Agreement’) between SEMMELWEIS EGYETEM and the Consumers, Health, Agriculture and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European Commission ('the Commission'), for the action entitled Empowering EU health policies on Task SHIfting (TaSHI). and mandates the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement, in accordance with Article 39. By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in accordance with the Agreement, with all the obligations and conditions it sets out. SIGNATURE For the beneficiary/new beneficiary/new coordinator [--TGSMark#signature-959886490_75_210--] Giovanni Baglio with ECAS id n005dqdx signed in the Participant Portal on 26/02/2021 at 12:14:02 (transaction id SigId-84688-xmXL NSuIMVC1pbxXQ9MPBO6Izt8CethQlbe9V9ggsNfhHwu9NZfMvp2k5 Thn8ci5QsXiJW6Ep4u2cxuHVwTCMO-rS0vSrmBGYCg3FMBs87Zim-g 8lVzJgIjkl0PYmxnHBkYRBVrTqPVJWtSg5UHOBzcybG7YEJHRV2xKqlco PIzfFLmgZ84zWDcTn9p4eI0ypgXa0). Timestamp by third party at 2021.02.26 12:14:08 CET 1 Grant Agreement number: 101018346 — TaSHI Associated with document Ref. Ares(2021)1431961 - 23/02/2021 ANNEX 3 ACCESSION FORM FOR BENEFICIARIES STICHTING NEDERLANDS INSTITUUT VOOR ONDERZOEK VAN DE GEZONDHEIDSZORG (NIVEL), established in OTTERSTRAAT 118-124, UTRECHT 3500 BN, Netherlands, VAT number: NL007077191B01, (‘the beneficiary’), represented for the purpose of signing this Accession Form by the undersigned, hereby agrees to become beneficiary No (‘3’) in Grant Agreement No 101018346 (‘the Grant Agreement’) between SEMMELWEIS EGYETEM and the Consumers, Health, Agriculture and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European Commission ('the Commission'), for the action entitled Empowering EU health policies on Task SHIfting (TaSHI). and mandates the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement, in accordance with Article 39. By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in accordance with the Agreement, with all the obligations and conditions it sets out. SIGNATURE For the beneficiary/new beneficiary/new coordinator [--TGSMark#signature-998294125_75_210--] Cordula WAGNER with ECAS id nwagncor signed in the Participant Portal on 01/03/2021 at 09:37:30 (transaction id SigId-92574-XEgcA GOztzn7Q3lQM9QelWItnRVROEbOl0iC3nSJJryIjLQBzwR3vDoKzl7Xq LcqjnH2RrdpnedcIJH81wrMRnK-rS0vSrmBGYCg3FMBs87Zim-8mq 89bzUtgwN4mlxsHlIUNmADtZo90dueNgO5pJPMF67DlLqhu16JKpr zH1NAii2YVLTkFrzbzJtczw9JVF36nR). Timestamp by third party at 2021.03.01 09:37:36 CET 2 Grant Agreement number: 101018346 — TaSHI Associated with document Ref. Ares(2021)1431961 - 23/02/2021 ANNEX 3 ACCESSION FORM FOR BENEFICIARIES LIETUVOS RESPUBLIKOS SVEIKATOS APSAUGOS MINISTERIJA (MOH-LT), established in VILNIAUS G 33, VILNIUS LT 01506, Lithuania, (‘the beneficiary’), represented for the purpose of signing this Accession Form by the undersigned, hereby agrees to become beneficiary No (‘4’) in Grant Agreement No 101018346 (‘the Grant Agreement’) between SEMMELWEIS EGYETEM and the Consumers, Health, Agriculture and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European Commission ('the Commission'), for the action entitled Empowering EU health policies on Task SHIfting (TaSHI). and mandates the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement, in accordance with Article 39. By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in accordance with the Agreement, with all the obligations and conditions it sets out. SIGNATURE For the beneficiary/new beneficiary/new coordinator [--TGSMark#signature-933839468_75_210--] Marius Ciurlionis with ECAS id n005qy0i signed in the Participant Portal on 17/03/2021 at 07:17:55 (transaction id SigId-33582-0EMY9j HS1sQRyDrYp1bhkhMCzYhCgCOHRQp5ZfaTqQswDRIztHK14TdB8SS uK7Wfd51EzspUSkcXrW37Xc8Mf5m-jpJZscgsw0KR3zhT7zb0ozG-vH7 GstiDznHzcFVgxDzsxMaLzW1K0NfzpoSPuCyHRdFIBwUhX8fmsxw8l1 Bvos6P6lEk6gUNc0xOPzVEQY0MAdd0). Timestamp by third party at 2021.03.17 07:18:04 CET 3 Grant Agreement number: 101018346 — TaSHI Associated with document Ref. Ares(2021)1431961 - 23/02/2021 ANNEX 3 ACCESSION FORM FOR BENEFICIARIES SOTSIAALMINISTEERIUM (SM-EE), established in Suur-Ameerika 1, TALLINN 10122, Estonia, (‘the beneficiary’), represented for the purpose of signing this Accession Form by the undersigned, hereby agrees to become beneficiary No (‘5’) in Grant Agreement No 101018346 (‘the Grant Agreement’) between SEMMELWEIS EGYETEM and the Consumers, Health, Agriculture and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European Commission ('the Commission'), for the action entitled Empowering EU health policies on Task SHIfting (TaSHI). and mandates the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement, in accordance with Article 39. By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in accordance with the Agreement, with all the obligations and conditions it sets out. SIGNATURE For the beneficiary/new beneficiary/new coordinator [--TGSMark#signature-998429731_75_210--] Marika PRISKE with ECAS id nprmaika signed in the Participant Portal on 18/03/2021 at 10:48:16 (transaction id SigId-48736-8aMY4 xaG4yyx2vMrWTqfg5bAbrvTznzQ4YGm4oxlTuvsEoxlb70ErznWMiI6 1IzVvF0iXAdo4FW0SguLID99vPq-jpJZscgsw0KR3zhT7zb0ozG-LfDNJr q5jTXcmYnSn1kH8VRXzKzormsnhfuRxn3WMFzu5F3TShGgNfrO0RF bPYqzPXZhgAPcxf6wdeWn9upZzzxm). Timestamp by third party at 2021.03.18 10:48:26 CET 4 Grant Agreement number: 101018346 — TaSHI Associated with document Ref. Ares(2021)1431961 - 23/02/2021 ANNEX 3 ACCESSION FORM FOR BENEFICIARIES UNIVERSITETET I SOROST-NORGE (USN), established in KJOLNES RING 56, PORSGRUNN 3918, Norway, VAT number: NO911770709MVA, (‘the beneficiary’), represented for the purpose of signing this Accession Form by the undersigned, hereby agrees to become beneficiary No (‘6’) in Grant Agreement No 101018346 (‘the Grant Agreement’) between SEMMELWEIS EGYETEM and the Consumers, Health, Agriculture and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European Commission ('the Commission'), for the action entitled Empowering EU health policies on Task SHIfting (TaSHI). and mandates the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement, in accordance with Article 39. By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in accordance with the Agreement, with all the obligations and conditions it sets out. SIGNATURE For the beneficiary/new beneficiary/new coordinator [--TGSMark#signature-921767430_75_210--] Pia Cecilie Bing-Jonsson with ECAS id n003s65q signed in the Participant Portal on 26/02/2021 at 12:34:53 (transaction id SigId- 85065-gVsZzt4CZ66gQmCllLu6Avq5HR0QKvv8VzLbYpnO2lKSXvRy3gyh qPZf6aOUrMVGGBW2yht4p1xusB6EmlH7pu- rS0vSrmBGYCg3FMBs87Zim-VOfLsUIK3kLw9wgjXbKXedgXhEU5f31qxF RIMPj2hvcr7SYkqSRrc7O78izNT94Pkq4F5Np0RNBAZYywWMLOQu). Timestamp by third party at 2021.02.26 12:34:59 CET 5 Grant Agreement number: 101018346 — TaSHI Associated with document Ref. Ares(2021)1431961 - 23/02/2021 ANNEX 3 ACCESSION FORM FOR BENEFICIARIES ISTITUTO REGIONALE PER IL SUPPORTOALLAE POLITICHE DELLA LOMBARDIA (POLIS-LOMBARDIA) (PoliS-Lombardia), established in VIA TORQUATO TARAMELLI 12/F, MILANO 20124, Italy, VAT number: IT07221390961, (‘the beneficiary’), represented for the purpose of signing this Accession Form by the undersigned, hereby agrees to become beneficiary No (‘7’) in Grant Agreement No 101018346 (‘the Grant Agreement’) between SEMMELWEIS EGYETEM and the Consumers, Health, Agriculture and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European Commission ('the Commission'), for the action entitled Empowering EU health policies on Task SHIfting (TaSHI). and mandates the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement, in accordance with Article 39. By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in accordance with the Agreement, with all the obligations and conditions it sets out. SIGNATURE For the beneficiary/new beneficiary/new coordinator [--TGSMark#signature-906213480_75_210--] Alessandro Colombo with ECAS id n005epmx signed in the Participant Portal on 03/03/2021 at 15:09:48 (transaction id SigId-122571-9JmkllV p7zPIC0yWyliDJHVbLTGkzMMLK41rBCYgHJEVXIGzQFv3MxDlt5NmkTk7 mx584Pd5ZyEJ4QTSfVjmzg4-rS0vSrmBGYCg3FMBs87Zim-F1DkKa30A4 atdzwFYdKeW9C0zzNfGfbC35QgyN0yBzyQPsGVi2kCNCMbgzgzs2bdm kIEE9zy2ngrzQ9FKn1CzYzWW). Timestamp by third party at 2021.03.03 15:09:53 CET 6 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 i print format A4 MODEL ANNEX 4 CHAFEA MGA — MULTI landscape FINANCIAL STATEMENT FOR [BENEFICIARY [name]/AFFILIATED ENTITY [name]] FOR REPORTING PERIOD [reporting period] 1 Receipts EU contribution Eligible costs (per budget category) Financial contributions Reimburseme Maximum EU A. Direct personnel B. Direct costs of C. Other direct 2 Income generated Requested EU D. Indirect costs Total costs given by third Total receipts 3 4 costs subcontracting costs by the action nt rate % constribution contribution parties to the beneficiaries A.1 Employees (or C.1 Travel equivalent) A.2 Natural persons C.2 Equipment under direct contract and seconded persons C.3 Other goods and services 6 5 Actual Actual Actual Flat-rate Cost form 7% d= e= a b c f g h= f + g i j k 0,07 * (a + b + c) a+ b + c + d [short name beneficiary / affiliated entity] The beneficiary/affiliated entity hereby confirms that: The information provided is complete, reliable and true. The costs declared are eligible (see Article 6). The costs can be substantiated by adequate records and supporting documentation that will be produced upon request or in the context of checks, reviews, audits and investigations (see Articles 12, 13 and 17). For the last reporting period: that all the receipts have been declared (see Article 5.3.3). i Please declare all eligible costs, even if they exceed the amounts indicated in the estimated budget (see Annex 2). Only amounts that were declared in your individual financial statements can be taken into account lateron, in order to replace other costs that are found to be ineligible. 1 See Article 6 for the eligibility conditions. 2 The indirect costs claimed must be free of any amounts covered by an operating grant (received under any EU or Euratom funding programme). A beneficiary that receives an operating grant during the duration of the action cannot claim any indirect costs for the year(s) covered by the operating grant (see Article 6.2.D). 3 See Article 5.2 for the reimbursement rate 4 This is the theoretical amount of EU contribution that the system calculates automatically (by multiplying the reimbursement rate by the total costs declared). The amount you request (in the column 'requested EU contribution') may have to be less. 5 See Article 5 for the cost forms. 6 Flat rate : 7% of eligible direct costs. Associated with document Ref. Ares(2021)1431961 - 23/02/2021 ANNEX 5 MODEL FOR THE CERTIFICATE ON THE FINANCIAL STATEMENT (CFS) This document sets out: - the objectives and scope of the independent report of factual findings on costs declared under a EU grant agreement financed under the Health Programme (2014-2020) or Consumer Programme (2014-2020) and - a model for the certificate on the financial statement (CFS). 1. Background and subject matter [OPTION 1 for actions with one RP and NO interim payments: Within 60 days of the end of the reporting period, the coordinator must submit to the Commission a final report, which should include (among other documents and unless otherwise specified in Article 15 of the Grant Agreement) a certified financial statement (CFS; see proposed model below) for each beneficiary and (if applicable) each affiliated entity, if: - it requests an EU contribution of EUR 150 000 or more as reimbursement of actual costs and - the maximum EU contribution indicated for that beneficiary/affiliated entity in the estimated budget (see Annex 2) as reimbursement of actual costs is EUR 200 000 or more.] [OPTION 2 for actions with several RPs and interim payments: Within 60 days of the end of each reporting period, the coordinator must submit to the Commission a periodic report, which should include (among other documents and unless otherwise specified in Article 15 of the Grant Agreement) a certified financial statement (CFS; see proposed model below) for each beneficiary and (if applicable) each affiliated entity, if: - the cumulative amount of EU contribution the beneficiary/affiliated entity requests as reimbursement of actual costs is EUR 150 000 or more and - the maximum EU contribution indicated for that beneficiary/affiliated entity in the estimated budget (see Annex 2) as reimbursement of actual costs is EUR 200 000 or more. The CFS must be submitted every time the cumulative amount of payments requested (i.e. including in previous financial statements) reaches the threshold (i.e. a first certificate once the cumulative amount reaches 150 000, a second certificate once it reaches 300 000, a third certificate once it reaches 450 000, etc.). Once the threshold is reached, the CFS must cover all reporting periods for which no certificate has yet been submitted.] 1 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 The beneficiary must provide the CFS for itself and, if applicable, for its affiliated entity(ies). The purpose of the audit on which the CFS is based is to give the Agency ‘reasonable assurance’1 that costs declared as eligible costs under the grant (and, if relevant, receipts generated in the course of the action) are being claimed by the beneficiary in accordance with the relevant legal and financial provisions of the Grant Agreement. The scope of the audit is limited to the verification of eligible costs included in the CFS. The audit must be conducted in line with point 3 below. Certifying auditors must carry out the audits in compliance with generally accepted audit standards and indicate which standards they have applied. They must bear in mind that, to establish a CFS, they must carry out a compliance audit and not a normal statutory audit. The eligibility criteria in the Grant Agreement always override normal accounting practices. The beneficiary and the auditor are expected to address any questions on factual data or detailed calculations before the financial statement and the accompanying certificate are submitted. It is also recommended that the beneficiary take into account the auditor’s preliminary comments and suggestions in order to avoid a qualified opinion or reduce the scope of the qualifications. Since the certificate is the main source of assurance for cost claims and payments, it will be easier to consider amounts as eligible if a non-qualified certificate is provided. The submission of a certificate does not affect the Agency’s right to carry out its own assessment or audits. Neither does the reimbursement of costs covered by a certificate preclude the Agency or the Commission, the European Anti-Fraud Office or the European Court of Auditors from carrying out checks, reviews, audits and investigations in accordance with Article 17 of the Grant Agreement. The Agency expects the certificates to be issued by auditors according to the highest professional standards. 2. Auditors who may deliver a certificate The beneficiary is free to choose a qualified external auditor, including its usual external auditor, provided that: - the external auditor is independent from the beneficiary and - the provisions of Directive 2006/43/EC2 are complied with. 1 This means a high degree of confidence. 2 Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of annual accounts and consolidated accounts or similar national regulations (OJ L 157, 9.6.2006, p. 87). 2 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Independence is one of the qualities that permit the auditor to apply unbiased judgement and objective consideration to established facts to arrive at an opinion or a decision. It also means that the auditor works without direction or interference of any kind from the beneficiary. Auditors are considered as providing services to the beneficiary/affiliated entity under a purchase contract within the meaning of Article 9 of the Grant Agreement. This means that the costs of the CFS may normally be declared as costs incurred for the action, if the cost eligibility rules set out in Articles 6 and 9.1.1 of the Grant Agreement are fulfilled (especially: best value for money and no conflict of interests; see also below eligibility of costs of other goods and services). Where the beneficiary/affiliated entity uses its usual external auditor, it is presumed that they already have an agreement that complies with these provisions and there is no obligation to find new bids. Where the beneficiary/affiliated entity uses an external auditor who is not their usual external auditor, it must select an auditor following the rules set out in Article 9.1.1. Public bodies can choose an external auditor or a competent public officer. In the latter case, the auditor’s independence is usually defined as independence from the audited beneficiary ‘in fact and in appearance’. A preliminary condition is that this officer was not involved in any way in drawing up the financial statements. Relevant national authorities establish the legal capacity of the officer to carry out audits of that specific public body. The certificate should refer to this appointment. 3. Audit methodology and expected results 3.1 Verification of eligibility of the costs declared The auditor must conduct its verification on the basis of inquiry and analysis, (re)computation, comparison, other accuracy checks, observation, inspection of records and documents and by interviewing the beneficiary (and the persons working for it). The auditor must examine the following documentation:  the Grant Agreement and any amendments to it;  the periodical and/or final report(s);  for personnel costs o salary slips; o time sheets; o contracts of employment; o other documents (e.g. personnel accounts, social security legislation, invoices, receipts, etc.); o proofs of payment;  for subcontracting o the call for tender; o tenders (if applicable); o justification for the choice of subcontractor; o contracts with subcontractors; o invoices; o declarations by the beneficiary; o proofs of payment; 3 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 o other documents: e.g. national rules on public tendering if applicable, EU Directives, etc.;  for travel and subsistence costs o the beneficiary’s internal rules on travel; o transport invoices and tickets (if applicable); o declarations by the beneficiary; o other documents (proofs of attendance such as minutes of meetings, reports, etc.); o proofs of payment;  for equipment costs o invoices; o delivery slips / certificates of first use; o proofs of payment; o depreciation method of calculation;  for costs of other goods and services o invoices; o proofs of payment; and o other relevant accounting documents. General eligibility rules The auditor must verify that the costs declared comply with the general eligibility rules set out in Article 6.1 of the Grant Agreement. In particular, the costs must:  be actually incurred;  be linked to the subject of the Grant Agreement and indicated in the beneficiary's estimated budget (i.e. the latest version of Annex 2);  be necessary to implement the action which is the subject of the grant;  be reasonable and justified, and comply with the requirements of sound financial management, in particular as regards economy and efficiency;3  have been incurred during the action, as defined in Article 3 of the Grant Agreement (with the exception of the invoice for the audit certificate and costs relating to the submission of the final report);  not be covered by another EU or Euratom grant (see below ineligible costs);  be identifiable, verifiable and, in particular, recorded in the beneficiary's accounting records and determined according to the applicable accounting standards of the country where it is established and its usual cost-accounting practices;  comply with the requirements of applicable national laws on taxes, labour and social security;  be in accordance with the provisions of the Grant Agreement (see, in particular, Articles 6 and 9-11a) and  have been converted to euro at the rate laid down in Article 15.6 of the Grant Agreement: 3 To be assessed in particular on the basis of the procurement and selection procedures for service providers. 4 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 o for beneficiaries with accounts established in a currency other than the euro: Costs incurred in another currency must be converted into euros at the average of the daily exchange rates published in the C series of the EU Official Journal determined over the corresponding reporting period. If no daily euro exchange rate is published in the EU Official Journal for the currency in question, the rate used must be the average of the monthly accounting rate established by the Commission and published on its website; o for beneficiaries with accounts established in euro: Costs incurred in another currency should be converted into euros applying the beneficiary’s usual accounting practice. The auditor must verify whether expenditure includes VAT and, if so, verify that the beneficiary: - cannot recover the VAT (this must be supported by a statement from the competent body) and - is not a public body acting as a public authority. The auditor should base his/her audit approach on the confidence level following a review of the beneficiary's internal control system. When using sampling, the auditor should indicate and justify the sampling size. Specific eligibility rules In addition, the auditor must verify that the costs declared comply with the specific cost eligibility rules set out in Article 6.2 and Articles 9.1.1, 10.1.1, 11.1.1, 11a.1.1 and 11a.2.1 of the Grant Agreement. Personnel costs The auditor must verify that:  personnel costs have been charged and paid in respect of the actual time devoted by the beneficiary’s personnel to implementing the action (justified on the basis of time sheets or other relevant time-recording system);  personnel costs were calculated on the basis of annual gross salary, wages or fees (plus obligatory social charges, but excluding any other costs) specified in an employment or other type of contract, not exceeding the average rates corresponding to the beneficiary’s usual policy on remuneration;  the work was carried out during the period of implementation of the action, as defined in Article 3 the Grant Agreement and  the personnel costs are not covered by another EU or Euratom grant (see below ineligible costs);  for additional remunerations: the 2 conditions set out in Article 6.2.A.1 are met (i.e. that it is part of the beneficiary’s usual remuneration practices and is paid in a consistent manner whenever the same kind of work or expertise is required and that the criteria used to calculate the supplementary payments are objective and generally applied by the beneficiary, regardless of the source of funding used);  for in-house consultants: the 3 conditions set out in Article 6.2.A.2 of the Grant Agreement are met (i.e. that the in-house consultant works under the beneficiary’s 5 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 instructions, that the result of the work carried out belongs to the beneficiary, and that the costs are not significantly different from those for personnel performing similar tasks under an employment contract). The auditor should have assurance that the management and accounting system ensures proper allocation of the personnel costs to various activities carried out by the beneficiary and funded by various donors. Subcontracting costs The auditor must verify that:  the subcontracting complies with best value for money (or lowest price) and that there was no conflict of interests;  the subcontracting was necessary to implement the action for which the grant is requested;  the subcontracting was provided for in Annex 1 and Annex 2 or agreed to by the Agency at a later stage;  the subcontracting is supported by accounting documents in accordance with national accounting law  public bodies have complied with the national rules on public procurement. Travel and subsistence costs The auditor must verify that travel and subsistence costs:  have been charged and paid in accordance with the beneficiary's internal rules or usual practices;  are not covered by another EU or Euratom grant (see below ineligible costs);  were incurred for travels linked to action tasks set out in Annex 1 of the Grant Agreement. Equipment costs The auditor must verify that:  the equipment is purchased, rented or leased at normal market prices;  public bodies have complied with the national rules on public procurement;  the equipment is written off, depreciation has been calculated according to the tax and accounting rules applicable to the beneficiary and only the portion of the depreciation corresponding to the duration of the action has been declared and  the costs are not covered by another EU or Euratom grant (see below ineligible costs). Costs of other goods and services The auditor must verify that:  the purchase complies with best value for money (or lowest price) and that there was no conflict of interests;  public bodies have complied with the national rules on public procurement;  the costs are not covered by another EU or Euratom grant (see below ineligible costs). 6 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Ineligible costs The auditor must verify that the beneficiary has not declared any costs that are ineligible under Article 6.4 of the Grant Agreement:  costs relating to return on capital;  debt and debt service charges;  provisions for future losses or debts;  interest owed;  doubtful debts;  currency exchange losses;  bank costs charged by the beneficiary’s bank for transfers from the Agency;  excessive or reckless expenditure;  deductible VAT;  VAT incurred by a public body acting as a public authority;  costs incurred during suspension of the implementation of the action;  in-kind contributions from third parties;  costs declared under other EU or Euratom grants (including those awarded by a Member State and financed by the EU or Euratom budget or awarded by bodies other than the Agency for the purpose of implementing the EU or Euratom budget); in particular, indirect costs if the beneficiary is already receiving an operating grant financed by the EU or Euratom budget in the same period;  costs incurred for permanent staff of a national administration for activities that are part of its normal activities (i.e. not undertaken only because of the grant);  costs incurred for staff or representatives of EU institutions, bodies or agencies. 3.2 Verification of receipts The auditor must verify that the beneficiary has declared receipts within the meaning of Article 5.3.3 of the Grant Agreement, i.e.:  income generated by the action (e.g. from the sale of products, services and publications, conference fees) and  financial contributions given by third parties, specifically to be used for costs that are eligible under the action. 3.3 Verification of the beneficiary’s accounting system The auditor must verify that:  the accounting system (analytical or other suitable internal system) makes it possible to identify sources of financing for the action and related expenses incurred during the contractual period and  expenses/income under the grant have been recorded systematically using a numbering system that distinguishes them from expenses/income for other projects. 7 Associated with document Ref. Ares(2021)1431961 - 23/02/2021 Certificate on the financial statement (CFS) To [Beneficiary/affiliated entity’s full name address] We, [full name of the audit firm/organisation], established in [full address/city/country], represented for signature of this audit certificate by [name and function of an authorised representative], hereby certify that: 1. We have conducted an audit relating to the costs declared in the financial statement of [name of beneficiary/affiliated entity] (the [‘beneficiary’][‘affiliated entity’]), to which this audit certificate is attached and which is to be presented to the Consumers, Health, Agriculture and Food Executive Agency under Grant Agreement No [insert number] — [insert acronym], covering costs for the following reporting period(s): [insert reporting period(s)]. 2. We confirm that our audit was carried out in accordance with generally accepted auditing standards in compliance with ethical rules and on the basis of the provisions of the Grant Agreement and its Annexes (and in particular the audit methodology described in Annex 5). 3. The financial statement was examined and all necessary tests of [all][[X]%] of the supporting documentation and accounting records were carried out in order to obtain reasonable assurance that, in our opinion and on the basis of our audit  total costs of EUR [insert number] ([insert amount in words]) are eligible, i.e.:  actual;  determined in accordance with the [beneficiary’s][affiliated entity’s] accounting principles;  incurred during the period referred to in Article 3 of the Grant Agreement;  recorded in the [beneficiary’s][affiliated entity’s] accounts (at the date of this audit certificate);  comply with the specific eligibility rules in Article 6.2 of the Grant Agreement;  do not contain costs that are ineligible under Article 6.4 of the Grant Agreement, in particular:  costs relating to return on capital;  debt and debt service charges;  provisions for future losses or debts;  interest owed;  doubtful debts;  currency exchange losses; 8 Associated with document Ref. Ares(2021)1431961 - 23/02/2021  bank costs charged by the [beneficiary’s][affiliated entity’s] bank for transfers from the Agency;  excessive or reckless expenditure;  deductible VAT;  VAT incurred by a public body acting as a public authority;  costs incurred during suspension of the implementation of the action;  in-kind contributions provided by third parties;  costs declared under other EU or Euratom grants (including those awarded by a Member State and financed by the EU or Euratom budget or awarded by bodies other than the Agency for the purpose of implementing the EU or Euratom budget); in particular, indirect costs if the [beneficiary][affiliated entity] is already receiving an operating grant financed by the EU or Euratom budget in the same period;  costs incurred for permanent staff of a national administration, for activities that are part of its normal activities (i.e. not undertaken only because of the grant);  costs incurred for staff or representatives of EU institutions, bodies or agencies;  [are claimed according to the euro conversion rate referred to in Article 15.6 of the Grant Agreement;]  total receipts of EUR [insert number] ([insert amount in words]) have been declared under Article 5.3.3 of the Grant Agreement and  the [beneficiary’s][affiliated entity’s] accounting procedures are in compliance with the accounting rules of the state in which it is established and permit direct reconciliation of the costs incurred for the implementation of the action covered by the EU grant with the overall statement of accounts relating to its overall activity. [However, our audit opinion is qualified for:  costs of EUR [insert number]  receipts of EUR [insert number] which in our opinion do not comply with the applicable rules.] 4. We are qualified/authorised to deliver this audit certificate [(for additional information, see appendix to this certificate)]. 5. The [beneficiary][affiliated entity] paid a price of EUR [insert number]) (including VAT of EUR [insert number]) for this audit certificate. [OPTION 1: These costs are eligible (i.e. incurred within 60 days of the end of the action referred to in Article 3 of the Grant Agreement) and included in the financial statement.][OPTION 2: These costs were not included in the financial statement.] Date, signature and stamp 9 Digitally sealed by the European Commission Date: 2021.02.23 14:36:13 CET This electronic receipt is a digitally signed version of the document submitted by your organisation. Both the content of the document and a set of metadata have been digitally sealed. This digital signature mechanism, using a public-private key pair mechanism, uniquely binds this eReceipt to the modules of the Funding & Tenders Portal of the European Commission, to the transaction for which it was generated and ensures its full integrity. Therefore a complete digitally signed trail of the transaction is available both for your organisation and for the issuer of the eReceipt. Any attempt to modify the content will lead to a break of the integrity of the electronic signature, which can be verified at any time by clicking on the eReceipt validation symbol. More info about eReceipts can be found in the FAQ page of the Funding & Tenders Portal. (https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/support/faq) Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. +32 22991111
Allikas: Sotsiaalministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel