dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Rahandusministeerium
Väljaminev kiriAvalik

Follow-up of ARM

Rahandusministeerium · 16. jaanuar 2023
Viit
9.2-4.3/14-20/01/330-1
Registreeritud
16. jaanuar 2023
Dokumendi liik
Väljaminev kiri
Adressaat
European Commission
Saabumis/saatmisviis
Muu infosüsteem
Funktsioon
9.2 VÄLISABI JA EUROOPA LIIDU TOETUSTE PROGRAMMIDE KORRALDAMINE
Sari
9.2-4.3/14-20/01 Struktuurivahendite programmi 2014-2020 kirjavahetus
Toimik
9.2-4.3/14-20/01/2023
Vastutaja
Kairi Nisamedtinov (Rahandusministeerium, Kantsleri vastutusvaldkond, Eelarvepoliitika valdkond, Riigieelarve osakond, Välisvahendite talitus)

Failid

  • 📎9.2-4.314-2001330-1 16.01.2023 Väljaminev kiri.asice772 KB

Sisu (failidest)

Selection criteria and the methodology for post-2020 in EE Compared to the 2014-2020 period, there has been no substantive change in the concept of what is meant by selection criteria and the methodology and the role of the Monitoring committee (MC) has remained the same in the CPR. Therefore, we plan to continue with current, well-functioning practice. Estonian Monitoring committee (MC) approves selection criteria and methodology in accordance with Article 40(2)(a) of Regulation (EU) 2021/1060 (2021-2027 CPR) and Article 73 (1), ensuring full compliance with the Regulation. In the regulations of the terms for granting support on the intervention level the same selection criteria and methodology is used, what has been already approved in MC and those criteria and methodology can be fulfilled or specified according to specifics of the field of the interventions. Therefore, the criteria and methodology on the intervention level can be clarifying, but not going beyond the criteria and methodology approved in the MC. Thus in the context of the CPR, it is not a case where new criteria would be created at the intervention level or criteria and methodology are changed contrary to CPR art 40. According to internal legal framework of Estonia, the responsibility for preparing and adopting legal acts of the terms for granting support from EU funds rests with the relevant ministry and those regulations of the terms for granting support are prepared in co-operation with stakeholders, including also some members of the MC or using sub-committees depending on the specific field and best coordination practice established by the ministry for stakeholder engagement. Discussions in the preparation process of draft legislation of the terms for granting support involve also selection criteria and methodology and whether they need to be specified for the particular intervention. Updated drafts are shared usually multiple times in preparation process with stakeholders and other parties involved via sub-committees or other co-operation format. As the draft is mature, it will be sent to the official public consultation that is usually 10-15 days and again- all the stakeholders, including members of MC can have a say including on selection criteria and methodology in a transparent and effective way. Public consultation of draft legislation of the terms for granting support is done in public online platform called EIS and this is a co-decision approach- the comments and feedback given by other ministries and by stakeholders is considered within the same, joint process. Description of the approval process in EIS The IT-solution System (EIS - https://eelnoud.valitsus.ee) is a public online platform where documents are coordinated between institutions, submitted to the government and the parliament, and public consultation takes place. In addition to national documents, drafts of European Union legislation and other documents related to the decision-making process of the European Union are also available in the EIS. Through the EIS, anyone, including social partners and stakeholders can monitor the processing of drafts, find documents on the platform using a search, participate in public consultations and submit comments on the documents under consultation/approval process. EIS is managed by the Government Office of Estonia and drafts intended for public consultation can be obtained, for example, here: https://eelnoud.valitsus.ee/main#D1dKaE2P Using the EIS is easy, the instructions are available to everyone and can be found here: https://eelnoud.valitsus.ee/abi.html. Although the EIS enables the search of all documents that have been and are being coordinated, reading the instructions shows that it is also possible to request notifications based on the relevant keywords. EIS is a well-known working environment for many and all partners who want to be involved are actively using it. Coordination of drafts is governed by the regulation of the Government of the Republic, which states the following about involvement: Relevant interest groups are involved in the preparation of a draft or other issue in accordance with the good practice of involvement, which is approved by the Government of the Republic. The good practice of involvement is published on the website of the Government of the Republic. Coordination is process regulated by Article 6. Article 8 regulates also very clearly the consideration of proposals submitted during coordination and the resolution of disagreements, where it is stated as follows: The draft and other documents necessary for the preparation of the issue are corrected based on the proposals submitted during coordination. The coordination process in the EIS is simple and familiar to ministries, stakeholders, umbrella organizations, journalists, etc. The consultation/approval process is carried out using the following steps: 1) The representatives of the ministries upload the legislation that is under consultation/approval. Those whose feedback must be asked for, are marked separately (and an official letter is also sent to them, so it´s not possible that the uploading of the draft will not be noticed). EIS allows you to mark designated ministries, stakeholders, umbrella organizations and other institutions as official coordinators (including members of MC). For example, the Ministry of Culture has just uploaded materials where feedback is also requested from the Union of Cities and Towns, who is also a member of the MC (e.g. here: https://eelnoud.valitsus.ee/main/mount/docList/babc7055-8e84-446c-8e2a-e2c3d1d9cdb8 2) A deadline is also set for coordination process. Usually, it´s 10 working days but it can be changed by agreement with the ministry. 3) The feedback is submitted to the responsible ministry by an official e-mail but is available to all parties, since it is uploaded to the EIS. It is also possible to add public comments on EIS platform. 4) Via EIS it is possible for the parties to: give the approval without comments; give the approval with comments; give the approval only if the changes mentioned in the comments are made; not to approve the documents. In all the cases, all the answers and their rationale are public and will be uploaded to EIS. An example is available here: https://eelnoud.valitsus.ee/main/mount/docList/356e34d6-79ce-4dc2-b66d-aa7e3617ddfb As you can see, each coordinator's response is also publicly visible. 5) At the end of the coordination process, the ministry responsible for the draft will prepare a table of comments, where there is a precise explanation/answer for each comment. For example, how the drafts were changed or supplemented according to the comment. Kommentaarid meetme määruse eelnõule_17112022.docx It is possible to guarantee a notification to European Commission and to members of MC (an e-mail to one dedicated address with the link to the particular consultation page with access to the files) as soon as the public consultation starts for all the regulations of the terms for granting support of CP 2021- 2027 interventions (including the ones listed in EC risk-assessment), enabling members of MC to give feedback to the draft legislation, including to be against the selection criteria and methodology described in the draft or to other elements of the regulation. Ministry responsible for the draft will prepare a table of comments, where there is a precise explanation/answer for each comment. For example, how the drafts were changed or supplemented according to the comments. In any case, according to the publicly given or direct feedback, also by the Commission or members of MC, draft legislation is being modified and improved before it is enforced. If any of other ministry or the majority of the members of the monitoring committee do not approve the draft as it is (including selection criteria and methodology), the draft is not accepted and is withdrawn by the responsible ministry and as the draft is renewed according to the feedback it will be sent to the new consultation round. For the sake of formal certainty, this procedure can be added to the rules of procedure of the MC as soon we have agreed with Commission using this approach. Establishing duplicate, parallel procedures creates unnecessary administrative burden for stakeholders and administration and provides no added-value. Instead- this existing transparent and effective coordination with MC, which ensures the compliance with CPR Art 71 (1) and Art 40 (2) (a), enables to concentrate not only on formal approval of the selection criteria and methodology, but on substantive cooperation for preparing the interventions and regulations of the terms for granting support. We consulted about this case also with stakeholders and according to the feedback we received the procedure described above is considered as a best practise for engaging MC to the preparation of draft legislation of the terms for granting support, including validating selection criteria and methodology. As shadow-MC2021-2027 approved selection criteria and methodology in May 2022 and as compared to previous period, the concept of selection criteria and the methodology and the role of the Monitoring committee (MC) has remained the same in the CPR, we have already started with some of 2021-2027 interventions based on the criteria and methodology approved by MC. Information about the calls already open with relevant links is available on: https://rtk.ee/2021-2027-meetmepohised- oigusaktid. In co-operation with Government Office of Estonia and other ministries we´ll make sure as soon as possible, that in case of next regulations of the terms for granting support of CP 2021-2027 interventions (including the ones listed in EC risk-assessment) that will be prepared, a notification is sent to European Commission and to members of MC (an e-mail to one dedicated address with the link to the particular consultation page with access to the files) as soon as the public consultation starts. However, we would like to emphasize that both the Commission and MC already have access to all the drafts currently in EIS. European Commission [email protected] 16.12.2022 REGIO.D.4/EO/(202 Follow-up of the Annual Review 2)9701578 Meeting on December 6, 2022 16.01.2023 Our ref. No Dear Mr Andreas von Busch Thank you for the fruitful Annual Review Meeting (ARM) and for the ARM minutes, also for all questions and comments. You can find answers to the questions raised at the ARM and comments to the minutes of the meeting in Annex I. Annex II provides an overview of Estonian process for selection criteria and methodology If you require any further information, please do not hesitate to contact us. Yours sincerely, (signed digitally) Triin Tomingas Head of Foreign Funds Unit /*Encl. Annex I Follow-up Annex I Estonian process for selection criteria and methodology Kairi Nisamedtinov +372 611 3096 [email protected] Suur-Ameerika 1 / 10122 Tallinn / Estonia / +372 611 3558 / [email protected] www.rahandusministeerium.ee / Reg. code: 70000272 1. Comments on the minutes There is one comment on the minutes. Page 5: IT platform for all draft legislation - eis.ee; the correct address is https://eelnoud.valitsus.ee/. 2. Ukrainian war refugees and ESF support Most of the interventions aimed at helping war refugees started in spring-summer 2022. This means that the latest project reports will not be available until January 2023. They are usually presented in late January-February. Below is a small overview of the ongoing activities and projects where refugees can receive assistance and interventions where they can enter. Interventions have also been mentioned, where aim is to support local government workers so they can help more efficiently war refugees. The Ministry of Social Affairs has confirmed that they add refugees throughout their various interventions, without making major changes in projects or legal acts, because there is no need to. 1) Ministry of Education and Research, sub-measure 1.6.2 Providing adults high-quality and relevant continuing education and retraining. The refugee crisis that arose in the spring led to the need to provide further training to the beneficiaries of temporary protection and they were added as a new target group. Unfortunately, the ability of educational institutions to offer training in Ukrainian or Russian is limited. The construction courses planned by the Tallinn Lasnamäe Mechanics School can be given as positive examples (there is a shortage of labour in the field and the target group can find a job after the training). 2) Ministry of Social Affairs, sub-measure 2.2.1 Welfare services for elderly, people with special needs and those with coping difficulties and their family members to support their employment. The refugees were added as one target group of intervention. The purpose of the grant is to support the integration of beneficiaries into Estonian society. Call for proposals was opened in July and closed in December 2022. All available budget is covered with application. Applicants were local governments and the total EU support for projects is 1.4 million euros. 3) Ministry of Social Affairs, sub-measure 3.1.1 Development, implementation and provision of labour market services and respective support services for the target group of the work- ability support reform, in order to maintain a job or find a new job. The project of the Social Insurance Board “Enabling the use of technical aid”. As of March 2022, the need for counselling for persons fleeing war has been added to the usual regular counselling on aid equipment. For this purpose, work processes were developed in cooperation with Social Insurance Board own crisis team and service providers in order to ensure rapid and needs-based availability of aid and initial knowledge of the possibilities of the Estonian state for refugees who need aid. 4) Ministry of Social Affairs, sub-measure 3.1.2 Activities supporting employers and employees to enhance working conditions. Labour Inspectorate updated their homepage. The most important new topic on the Working Life Portal is “Ukraine War Refugees and Employment Relations”, which contains several newsletters (Labour Inspectorate’s newsletter, Human trafficking information for refugees and their helpers, Working in Estonia —home from work healthy, Say “no” to the envelope salary!). The information is available in Ukrainian. 5) Ministry of Social Affairs, sub-measure 16.1.1 Providing labour market services. The intervention “My first job in Estonia”: since the number of people with temporary protection started increase from March of 2022, the provision of the service began to grow exponentially. Due to the high number of Ukrainian war refugees and their readiness to move to the labour market and the willingness of employers to recruit, a new measure to support work for beneficiaries of international protection was launched and implemented from June 2022. 3. Whether the ESF funding could facilitate bringing additional teachers/support specialists to the schools (could be from amongst Ukrainian refugees)? Yes, ESF funds are already being used to facilitate bringing additional teachers to the schools. Due to the war in Ukraine, there are many refugee children in our educational institutions. Some Ukrainian refugee teachers and support specialist are already working with refugee children in our education institution. They usually have temporary contracts because they do not meet our qualification requirements. We have planned special measures from ESF, state budget and Swiss-Estonian cooperation programme for those teachers and support specialists who would like to meet the qualification requirements and work in our education system with a permanent contract. We offer them Estonian language training and professional development courses to help them meet our qualification requirements. We also need to focus on our in-service teachers and school leaders, who need to ensure that refugee children can continue their education in Estonia. ESF funding is used to prepare them for teaching in a multicultural and multilingual environment.
Allikas: Rahandusministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel