dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Riigi Kaitseinvesteeringute Keskus
Sissetulev kiriAvalik

Kiri

Riigi Kaitseinvesteeringute Keskus · 25. august 2017
Viit
5-2/17/2436-2
Registreeritud
25. august 2017
Dokumendi liik
Sissetulev kiri
Adressaat
N.R. Energy OÜ
Saabumis/saatmisviis
E-post
Funktsioon
- -
Sari
- -
Toimik
- -

Failid

  • 📎NRE170824365 Tapa VV Vastus kirjale 4-10171007-1.bdoc10151 KB

Sisu (failidest)

Tapa Vallavalitsus Pikk 15 45106 Tapa Lääne-Virumaa Teie 08.08.2017 nr 4-10/17/1007-1 Meie 24.08.2017 nr 365 Koopia: Riigi Kaitseinvesteeringute Keskus Konkurentsiamet Kaugküte Tapa linna kaugküttepiirkonnas Lugupeetud hr Alari Kirt ja hr Andrus Freienthal Vastuseks Teie 08.08.2017 kirjale võime teatada järgmist. Esiteks märgime, et kahetsusväärne on Tapa Vallavalitsuse poolne tegevus, millega viidatakse N.R. Energy Osaühingule, kui vastutustundetule soojatootjale, kes väidetavalt enda kohustusi ei täida. Juhime teie tähelepanu, et hoolimata sellekohase kohustuse puudumisest, on N.R. Energy Osaühing kaasanud Tapa valla esindajad uue hakkepuidukatlamaja rajamise protsessi, et tagada vallale parim võimalik informatsioon tööde kulgemise kohta. Veelgi veidram on see kõik Tapa Vallavalitsuse enda 12.10.2016 kirja nr 4-10/16/1515-2 (Lisa 1) taustal. Samuti on N.R. Energy OÜ tellinud ehitustööd tunnustatud ja pikaajaliselt toiminud ehitajalt AS TREV-2 Grupp, kes kahjuks on tööde käigus osutunud teatud küsimustes ebapädevaks ja/või lohakaks, tuues kaasa katlamaja valmimise ulatusliku venimise (Lisad 2-4). Olukorras, kus N.R. Energy Osaühing on andnud endast parima, et sundida AS-i TREV-2 Grupp enda lepingulisi kohustusi täitma, palume käesolevaga selgitada ja tõendada asjaolusid, millele tuginedes on Tapa Vallavalitsus viidanud N.R. Energy Osaühingule, kui vastutustundetule soojatootjale, kes väidetavalt enda kohustusi ei täida. Palume käsitleda kirja eelmainitud osa teabenõudena, millele ootame vastust hiljemalt viie päeva jooksul. Teie 8. augusti 2017 kirja ülejäänud punktide osas märgime järgnevat. N.R. Energy Osaühing esitas hinnataotluse põlevkiviõli baasil sellepärast, et vastavalt kehtivale korrale saime me esitada hinnataotluse ainult sellelt baasilt, milles me sel ajahetkel kindel olime. Kui hakkpuidu katlamajale on välja antud kasutusluba, esitame me koheselt uue hakkpuidukatlamaja arvestava hinnataotluse. Kuna seda oleme me ka varem kinnitanud, puudub põhjus paanika külvamiseks. Loodame, et see toimub kiiremini kui näiteks katlamaja ehitusloa taotluse menetlemine (28.03.2016-18.05.2016), Konsumi liitumistorustiku kasutusloa menetlemine (23.02.2017-18.05.2017) või veel enam täiendava maaeraldise Üleviste 5 vormistamine (2014-2016). Eksitav on Teie väide, et katlamaja ehituse lõpetamise tähtaja määras tellija ehk N.R. Energy OÜ. Tuletame meelde, et määruseid annavad välja siiski kohaliku omavalitsuse organid. Erasektor tegutseb lepingulistel N.R. Energy OÜ Registrikood 12364776 SWEDBANK AS e-post: [email protected] RTVL003576 KMKR EE101802288 Liivalaia 8, 15040 Tallinn Tel +(372) 336 7777 KST000023 Järve küla, Kohtla vald SWIFT/BIC: HABAEE2X Faks +(372) 337 4057 KSM000019 30331 Ida-Virumaa IBAN: EE122200221024916807 KSJ000014 EESTI alustel, s.t ehituse lõpetamise tähtaeg tulenes töövõtja AS TREV-2 Grupp lepingulisest kinnitusest lõpetada katlamajaga seotud tööd 31.01.2017. Kahjuks töövõtja oma lubadust ei suutnud täita. Hilisemalt saatsime Tapa Vallavalitsusele 15.05.2017 kirjaga nr 233 (Lisa 5) kokkuvõtte katlamaja ehitusprotsessi lõpetamise kohta. Peale seda kujunes välja olukord, kus meil puudus võimalus koostada tööülesanne konkreetse hetke seisuga võimalikele alternatiivsetele tööde teostajatele, kuna AS TREV-2 Grupp oli asunud puuduseid likvideerima ning olukord muutus iga päevaga. Tänaseks on väga suur osa puuduseid töövõtja poolt likvideeritud ja me näeme võimalust vastu tulles avalikkuse huvile allkirjastada töövõtjaga tööde lõplik üleandmise-vastuvõtmise akt koos allesjäänud puuduste nimekirjaga, et alustada kasutusloa taotlemist. Tegelikult on pressing hakkpuidukatlamaja käiku andmiseks teie 08.08.2017 kirjaga nr 4-10/17/1007-1 sarnaselt toimunud Tapa Vallavalitsuse ametnike poolt varemgi. Ainuke erand on olnud hr Alari Kirt, kes on tunnistanud, et katlamaja iga hinnaga käiku andmisest tähtsam on kindlalt funktsioneeriv katlamaja. Veel vastutustundetusest. Tapa linna lõunapoolses osas asuv Kooli katlamaja nagu ka põhjapoolses osas asuv Leina katlamaja on töökorras. Just praegu toimub Leina katlamaja vandalismi tõttu kannatada saanud ühendustorustiku isolatsiooni vahetus ca 100 m ulatuses ja katlamajja paigaldatakse reservpump. Muudest probleemidest Tapal. Veebruaris 2017 pöördus meie poole Tapa linna korteriühistute nimel hr Peeter Lauring tehnilise küsimusega seoses küttevees ilmnenud kütteõliga. Vastava informatsiooni saamise järgselt oli N.R. Energy OÜ hoolsa ettevõtjana probleemi sisu selgumise järgselt koheselt valmis kütteperioodi lõppedes küttesüsteeme puhastama. Pakkusime kütteperioodi järgseks kohtumiseks võimaliku variandina 20. juuli 2017 kell 10.00 (s.h ka Tapa Vallavalitsusele), et koostöös korteriühistute esindajatega läbi arutada konkreetsed võimalikud kitsaskohad, mille alusel oleks võimalik eelneva kütteperioodi põhjal teha parendustegevusi tulevikulahenduste nimel ja leppida kokku täpne tegevuskava (Lisa 12). Üllatavalt olid kohtumiseks kokkulepitud ajal kohal vaid N.R. Energy OÜ esindajad. Positiivne suuline tagasiside kui ka soojatarbijate esindajate võimalikke kitsaskohti käsitlevale koosolekule mitteilmumine tõendab NRE valitud kliendi heaolust lähtuvate parenduslike tegevuskavade tõhusust ning on tõlgendatav selge märgina, et N.R. Energy OÜ ja korteriühistute senise koostöö tulemusena on probleemid lahendatud ning kaotanud oma aktuaalsuse edaspidiseks. Koostööd ja rahulolu kinnitab ka 20.07.2017 ja hilisemate otsesuhtluste käigus korteriühistutelt saadud suuline tagasiside – käesolevaks ajaks on küsimused lahendatud või ei ole neid tegelikult olnudki ning allkirjade kogumine käis kampaania korras. Erilist heameelt valmistab esmakordselt ametlikult meieni jõudev informatsioon, et meid otseselt puudutav asi – Tapa linna kaugküttesüsteemi ja Kaitseväe 1. Jalaväebrigaadi linnakut ühendav kaugküttetrass on juba 01.12.2016 komisjoni poolt vastu võetud ning trass on valmis sihtotstarbeliseks kasutamiseks. Kahjuks küll puudub meil ülevaade, millises ulatuses ja kas üldse arvestati meie poolt ehituse käigus esitatud esmajoones selle ja ka liitumissõlme ohutu ekspluateerimisega seotud märkusi (vt Lisa 6). Arvestama peab asjaoluga, et soojakandja temperatuur pealevoolul ulatub 90 °C-ni, see aga võib kujuneda otseseks ohuks teenindava personali elule, samuti nagu torustiku rajamine maapinnale lähedale (kõigest 40 cm torustiku isolatsiooni ülemisest punktist maapinnani) ja ilma klassikaliste kompensaatoriteta. Mis juhtub siis, kui keegi mõtleb hakata üle torude liiklema rasketehnikaga või nt kündma? N.R. Energy OÜ Registrikood 12364776 SWEDBANK AS e-post: [email protected] RTVL003576 KMKR EE101802288 Liivalaia 8, 15040 Tallinn Tel +(372) 336 7777 KST000023 Järve küla, Kohtla vald SWIFT/BIC: HABAEE2X Faks +(372) 337 4057 KSM000019 30331 Ida-Virumaa IBAN: EE122200221024916807 KSJ000014 EESTI Küll aga teame, et hankel esitatud nõue torustiku isolatsiooni osas vähenes 3. klassilt 2. klassile. See andis küll kokkuhoidu ehituskuludes, suurendas aga soojakadusid rajatise ekspluatatsioonil, mida N.R. Energy Osaühing on sunnitud enda tegevuse korraldamisel arvesse võtma. Sarnane tegevus on N.R. Energy Osaühingule teadaolevalt Tapa valla tegevuses esinenud ka varem, kui kohalike soojustrasside renoveerimisel on kasutatud sisuliselt isolatsioonita torustikku või jäetud osaliselt torustik renoveerimata (Lisa 7). Seetõttu tekkiv suur trassikadu ja torustiku kõrged kulud toovad kaasa vahetu mõju tarbijale müüdavale sooja hinnale, millest meie hinnangul on vaja teavitada Tapa kaugküttepiirkonna tarbijaid. Soojuskadusid suurendab ka soojatorustiku rajamine maapinna lähedale, kogu ulatuses maapinna külmumispiirist kõrgemale. Eeltoodu ja asjaolu, et Tapa vallale makstav soojustrasside rent on ebatavaliselt kõrge, viitab asjaolule, et Tapa Vallavalitsus ei ole valla soojamajanduse korraldamisel lähtunud soojatarbijate huvidest. Sellist järeldust toetavad järgnevad asjaolud:  Kuna N.R. Energy Osaühing on võrguettevõtjaks paljude omavalitsuste territooriumil ning püüame end kursis hoida ka konkurentide/kolleegide juures toimuvaga, siis võime öelda, et tavapraktika olukorras, kus kohalik omavalitsus teostab SA KIK toel investeeringuid kaugküttetorustikesse, on torustike renditasu nullmäär või sümboolne madal tasu. Seda ikka selleks, et selle kohaliku omavalitsuse territooriumi elanike kulude koorem oleks väiksem.  Oleme rendisumma ebatavalisele suurusele ka varem tähelepanu juhtinud (vt nt meie 13.05.2015 kirja nr 64 – Lisa 8), kuid tulemusteta.  Torustik on tegelikkuses rekonstrueeritud osaliselt, jättes soojakaod praktiliselt samale tasemele (vt nt Lisa 7). Kokkuvõtvalt vastused Teie otsestele küsimustele:  Millal esitatakse uue katlamaja kasutusloa taotlus? Kasutusloa taotlus esitatakse koheselt peale katlamaja üleandmist AS TREV-2 Grupi poolt ja selle vastuvõtmist N.R. Energy Osaühingu poolt, mis meie arvates võib toimuda lähipäevadel.  Millal esitatakse Konkurentsiametile Tapa kaugküttepiirkonna hakkepuidukatlamajas toodetud soojuse piirhinna kooskõlastamise taotlus? Tapa kaugküttepiirkonna hakkpuidu katlamaja toimimisega arvestav soojuse piirhinna taotlus esitatakse Konkurentsiametile koheselt peale Üleviste 5 katlamajale kasutusloa saamist.  Millal katsetatakse Kaitseväe 1. Jalaväebrigaadi linnakut varustav kaugküttetrass? Nimetatud kaugküttetrass on meie oletuse kohaselt katsetatud ehituse käigus ega vaja seepärast uuesti katsetamist. Küll aga alustame torustiku täitmist veega, kui torustiku omanik kinnitab, et seda võib ohutult teha. Lisame veel niipalju, et juba 24.03.2017 kirjaga nr 151 (Lisa 9) pärisime võimaluse üle trasside täitmiseks, valla poolt oli vastus äraütlev. Informeerime siinjuures Tapa Vallavalitsust, et peale 07.08.2017 telefoni teel saavutatud kokkulepet toimuvad alates 10. juulist 2017 RKIK-iga otsekonsultatsioonid soojuse müügilepingu sõlmimiseks (Lisa 10). Selle käigus esitas RKIK 15.08.2017 rida nõudmisi, millest enamusega me oleme 16.08.2017 leidnud võimaluse nõustuda. Eelnevalt (Lisa 11) oleme 30.12.2016 kirjaga nr 463 teavitanud Kaitseministeeriumi võrguühenduse valmimisest katlamajas ning 30.12.2016 e-kirjaga kutsusime ostu-müügi läbirääkimistele (vastus puudus). 17.01.2017 kirjaga nr 463 kutsusime Kaitseministeeriumi veelkordselt ostu-müügi N.R. Energy OÜ Registrikood 12364776 SWEDBANK AS e-post: [email protected] RTVL003576 KMKR EE101802288 Liivalaia 8, 15040 Tallinn Tel +(372) 336 7777 KST000023 Järve küla, Kohtla vald SWIFT/BIC: HABAEE2X Faks +(372) 337 4057 KSM000019 30331 Ida-Virumaa IBAN: EE122200221024916807 KSJ000014 EESTI läbirääkimistele ja tarbimist alustama (vastus oli tähtaega edasilükkav). 22.02.2017 teatas RKIK, et nad saavad alustada soojuse tarbimist alles sügisel 2017 algavast kütteperioodist. Sellest sündmusest edasi kuni soojuse müügi läbirääkimisteni toimus RKIK-iga samuti mitmesugune tööalase informatsiooni vahetus. Lugupidamisega /allkirjastatud digitaalselt/ Ahto Tisler Juhatuse liige Lisad: 1. Tapa Vallavalitsuse 12.10.2016 kiri nr 4-10/16/1515-2 2. Tapa katlamaja töökoosoleku protokoll 3. Tapa katlamaja elektriosa puuduste nimekiri 3a. Tapa katlamaja Profibus`i testi järeldus 4. Tapa katlamaja ehituslike puuduste nimekiri 5. NRE 15.05.2017 kiri nr 233 6. Valik NRE märkusi torustiku ehitusel 7. NRE 16.05.2017 kiri nr 238 8. NRE 13.05.2015 kiri nr 64 9. NRE 24.03.2017 kiri nr 151 10. RKIK lepingu kooskõlastus 11. RKIK varasem kirjavahetus 12. NRE 26.07.2017 kiri nr 327 N.R. Energy OÜ Registrikood 12364776 SWEDBANK AS e-post: [email protected] RTVL003576 KMKR EE101802288 Liivalaia 8, 15040 Tallinn Tel +(372) 336 7777 KST000023 Järve küla, Kohtla vald SWIFT/BIC: HABAEE2X Faks +(372) 337 4057 KSM000019 30331 Ida-Virumaa IBAN: EE122200221024916807 KSJ000014 EESTI TAPA VALLAVALITSUS Ahto Tisler Teie: 12.09.2016 nr 245 N.R. Energy OÜ [email protected] Meie: 12.10.2016 nr 4-10/16/1515-2 [email protected] Tapa linna kaugküttepiirkonna soojusmajanduse arengukava aastateks 2014-2026 korrigeerimine Tapa linna kaugküttepiirkonna soojusettevõte N.R. Energy Osaühing on teinud Tapa Vallavalitsusele ettepaneku „Tapa linna kaugküttepiirkonna soojusmajanduse arengukava aastateks 2014 - 2026“ korrigeerimiseks. Tapa Vallavalitsus tunnustab Tapa linna kaugküttepiirkonna soojusettevõtet selle eest, et viimastel aastatel on koostöö kohaliku omavalitsusega muutunud konstruktiivseks ja sisuliseks ning soojusettevõtte on asunud tegutsema selle nimel, et tagada kaugküttepiirkonnas varustuskindel, usaldusväärne, efektiivne ja tarbija vajadustele vastav soojusvarustus. Vabariigi Valitsuse poolt Riigikogule menetlemiseks esitatud kaugkütteseaduse muutmise seaduse eelnõu kohaselt peavad kohalikud omavalitsused, mille kaugküttepiirkonnas tegutseb alla 50GWh tootmismahuga soojusettevõtja või mis soovivad kaugküttepiirkonda luua või muuta, võtma vastu hiljemalt 2017. aasta lõpuks soojusmajanduse arengu kavandamise otsuse, kus nähakse ette kaugkütte võrgupiirkonna vähemalt 10 aasta tulevikuperspektiivi. Hetke seisuga veel ei ole ühtegi konkreetset normatiivakti, mis soojusmajanduse arengukava koostamist reguleeriks. Tapa vallavolikogu, lähtudes elulistest vajadustest ja ennetades lähiajal jõustatavat normatiivakti ning eesmärgiga tagada kaugküttepiirkonnas varustuskindel, usaldusväärne, efektiivne ja tarbija vajadustele vastav soojusvarustus, kinnitas „Tapa linna kaugküttepiirkonna soojusmajanduse arengukava aastateks 2014 - 2026“ septembris 2014. Kaugküttepiirkonna soojusmajanduse arengukava koostamise mõte ei ole iga tegevuse või realiseeritud eesmärgi järel arengukava muutmine või täiendamine. Arengukava seab pikaajalised sihid ehk märgistab tulevikuperspektiivid, mida realiseeritakse aasta-aastalt. Seega arengukava ei ole kuupäevaline tööplaan. Tapa linna kaugküttepiirkonna soojusmajanduse arengukava võeti vastu 12 aastaks ning hetkel ei ole otstarbekas asuda seda korrigeerima. Mõistlik on ellu viia kehtiva arengukava tegevuskava suurimad projektid. Tapa vallavalitsus on hästi informeeritud Tapa linna kaugküttepiirkonna soojusettevõtja arendus- ja parendustegevustega seoses. Pikk 15 Tel 3229 650 IBAN: EE722200001120077103 45106 TAPA, Lääne-Virumaa Faks 3229 651 Swedbank AS Reg nr 75033477 E-post: [email protected] Kood 767 Teie kirjas väljatoodud ettepanekud vajavad loomulikult väga tõsist lähenemist ja mitmekülgset analüüsi. Tapa vallavalitsusel puudub hetkel lõplik kindel teadmine, missugune variant oleks kaugküttesüsteemi tehnilise töö tagamise seisukohalt ja tarbijate jaoks varustuskindlat, efektiivset ning soodsat kaugkütet silmas pidades, parim lahendus. Tapa vald peab olema kindel, et valitud variant oleks parim. Uue momendina saab välja tuua asjaolu, et Tapa Vallavolikogu on alustanud ühinemisläbirääkimisi Tamsalu vallaga. Sellega seoses, juhul, kui võimalik ühinemine teostub, on otstarbekas 2018 aastal välja töötada ühinenud valla uued valdkondlikud arengukavad. Suure tõenäosusega algatatakse „Tapa linna kaugküttepiirkonna soojusmajanduse arengukava aastateks 2014 - 2026“ muutmine kas 2017 sügisel või 2018 aasta algul. Tapa linna kaugküttepiirkonna soojusettevõte N.R. Energy OÜ kaasatakse arengukava muutmise tööprotsessi ning tehakse tihedat koostööd parima tulemuse saavutamiseks. Lugupidamisega /allkirjastatud digitaalselt/ Andrus Freienthal abivallavanem vallavanema ülesannetes 322 9655; 5918 2790 [email protected] 2 ERAKORRALISE KOOSOLEKU Protokoll 25.07.17 Ehitusobjekt: Tapa hakkepuidukatlamaja ehitustööd, Üleviste tn 5, Tapa, L.-Virumaa Koosoleku koht, aeg Ehitusplatsi soojak, Üleviste tn 5, Tapa 25.07.2017. kell 10.30 Leping: 06.06.2016 Osavõtjad: Asutus/ettevõte Osaleja nimi, amet, kontaktandmed Tähis Tellija, esindajad: N.R. Energy OÜ Nikolai Reisman, leping,ja tehn. küsimused 51 09 369 [email protected] NR Ahto Tisler, lepingulised küsimused 5199 1916 [email protected] AT Sven Vallimäe SV Pluvo OÜ Sergei Lištšina hooldusfirma, elekter 52 66 536 SL Tellijaesindaja/OJV: P.P.Ehitusjärelevalve OÜ Rein Kivi, omanikujärelevalve 56 608 207 [email protected] RK Ainar Viires, omanikujärelevalve 56 608 207 [email protected] AV Urmas Tammemäe, omanikujärelevalve 50 38 730 [email protected] UT Meelis Viikmann, omanikujärelevalve 51 57 088 [email protected] MV Töövõtja (Ehitaja): AS TREV-2 Grupp/ OÜ Taskar Lennar Vijar, projektijuht-objektijuht 56 215 071 [email protected] LV Olavi Mägi meeskonna liige 51 991 916 OM Andres Pürg, insenerehituse valdk. juht 51 00 507 [email protected] AP Riiklikult tunnustatud ekspert Mart Poola ekspert 50 30 553 MP Projekteerija OÜ EMP A&I Tarvo Trei juhatuse esimees 506 8248 [email protected] Tr Päevakord: 1. Elektripaigaldise ülevaatuse/kontrolli aruanne 30.03.17 - Sergei Lištšina, Pluvo OÜ, 05.06.17 ülevaatuse järgi 2. Projekteerija ülevaade ehituse puudustest - Tarvo Trei, OÜ EMP A&I kirja Nr. 19 / 29.06.2017 alusel 3. Tellija kokkuvõte, edasine tegevus Koosoleku kutse alus: Ahto Tisler kiri 20.07.2017 nr 325 Sisu: 1. Elektripaigaldis 1. kilbid - tegelikult paigaldatud kilbid ei vasta dokumentides toodud andmetele - kas on fabritseeritud , sh. mõõdistused? Sergei Lištšina Mõõteriist oli taatlemata, siit dokumentide võltsimise kahtlus ? millal saab õiged dokumendid, mille järgi kontrolli teostada? 2. piksekaitse - sama küsimus? 3.kaabliredelid, kaablite paigaldus - puuduvad tootja kinnitused, peate tegema vastavalt tootja juhistele 4. nõrkvoolu- ja Profubus kaablid teiste kaablitega koos lubamatult, tegin sellest täna 10 pilti 5. mõõdistused - on olemas, vormistus ei sobi, täpsustan etteheiteid täna e-kirjaga; parandate, mõõdistame uuesti 6. kaabliteede geodeetiline mõõdistus - puudub - LV: on tehtud, asub Ehitusdokumentatsiooni kaustas Lennar Vijar: Ehitajale on täna kergitatud uusi teemasid, saadame e-kirja neist Nikolai Reisman/ AT: üritaks vähem tegelda kirjavahetusega, rohkem tegeliku tegevusega, et Töö korda saada Ahto Tisler : 1.Elektri-automaatika paigalduste tänased puudused seavad ohtu Katlamaja töö ja soojavarustuse talvel, teemat oleme arutanud ka Vallaga (hr Kirt), mis on ka üheks põhjuseks, et me täna Kasutusluba ei taotle; 2. tehkem Töö korda! meil on juba piisavalt kogemusi läbipõlenud mikroskeemidega, 2 radari läbipõlemine näitab, et tõsiseid puudusi on ka analoogsüsteemis - teame, et läbipõlengud on Ehitaja tööst tingitult 3. küsisime ka pakkumist Pluvo OÜ-lt EL osa korda tegemiseks, parandustööde kogu kulu oleks 65 tuh.+ km euri; 4. anname teile, Trev-2, parandusteks aega 10 tööpäeva alates homsest, seejärel teeme lõpliku otsuse, kuidas edasi 2. Projekteerija 1. piirdeaia postide paigaldus - pole projektikohane - RK: kontrollime pärast Koosoleklut postikinnituse tugevust Tarvo Trei: 2. andusrid pole mahutite juures, kaabliühendus on üle 40 m - ei kooskõlasta töölahendust 3. katus laseb läbi, kruve on hõredalt, lisaks katmata kruviaugud - LV: parandasime, jälgimisel,ootame vihma 4.põrand, laigulisus ja praod - seda Projekt ette ei näe, Boileri ette tuleb vuuk lõigata - LV: seadmed on nihkes Nikolai Reisman/ Ahto Tisler : põrandapraod tuleb sisse lõigata, täita, puhastada pinnad Tarvo Trei: uus katlamaja 5. valgustus - ei vasta Projektile 6.vent.restide tsinkvõrk roostetab - vaja välja vahetada 7. uued praod col.-kivi seintes - 8.tuletõkke pätse Laos Projekt ette ei näe, plekiga katmine pole teostatud ladustamise kõrguseni, 6m - teostada 9. roheline valgusvöö fassaadil lainetab, pole projektikohane - rikub kogu fassaadi, on vaja korda saada 10. betoon sillusriba-pandus roostega määrdunud - vaja korda saada, LV: Ehitajal pole lahendust 11. piksekaitse traat fassaadil ei kulge korrektselt 12. tuhakonteineri läbiviik pole tihe vana katlamaja 13.SBS ülespöörded pole veenvad - LV: on teostatud Projekti järgi, jälgime, lahendame vajadusel, garantiitööna 14. parapetiplekk lainetab - AT:lahendus pole hea; LV: meie paremat teha ei saa 15.galeriiplekk, seinad roostetavad - LV: puhastasime, ei roosteta, aga roostet annab Korsten veel mitu aastat 16.plahvatuspind, väravad, kas ikka toimivad, teostusdokumentatsioonis kinnitust ei leidnud 17. ventillaator, müra töökojaruumis pole Projektikohaselt ( katusel) lahendatud, kuigi db tase on alla saadud 18. Kokkuleppest 15.02.2017 on osa puudusi likvideerimata 19. vent.kasetid pole korduvkasutatavad - LV. tarnija kontaktid on Tellijale antud 20. dokumentatsioonis on puudusi - saadan Tabeli uuesti ülesjäänud märkustega 3. Tellija kokkuvõte Nikolai Reisman/ 1. koolitused pole toimunud täies ulatuses, nõuetekohaselt, oleme teid sellest oma kirjaga 16.06.2017 teavitanud Ahto Tisler : 2.kasutusjuhendeid on puudu, olemasolevates on vaja teha olulisi täiendusi, vaadake 3. täna ülevalolevate puuduste likvideerimiseks on aega 10 päeva, mida muide Ehitaja ise ka välja pakkus, alates 26.07.17 puuduste likvideerimisel lähtuge meie varasemas kirjavahetuses toodust - täna pole me ju midagi lisanud Edasisest Tellija otsustest anname teada jooksvalt Protokolli lisad: 1. Ahto Tisler kiri 20.07.2017 nr 325 2. Elektripaigaldise ülevaatuse/kontrolli aruanne 30.03.17, Pluvo OÜ, 05.06.17 ülevaatuse tulemused 3. Tarvo Trei, OÜ EMP A&I kiri Nr. 19 / 29.06.2017 3 Protokoll: koostas: Rein Kivi kinnitatud, esindajate allkirjad: Tarvo Trei Nikolai Reisman Lennar Vijar Ainar Viires, Ahto Tisler Andres Pürg Urmas Tammemäe Sven Vallimäe Olavi Mägi , Meelis Viikmann Sergei Lištšina Mart Poola / protokoll on allkirjastatud digitaalselt / N.R. Energy OÜ Järve küla, Kohtla vald 30331 Nr.59, 6.04.2017 Tapa katlamaja Profibus`i testi järeldus Uurisime lähemalt Saksa Automaatika OÜ tehtud Profibus kaabelduse testi tulemusi. Saab teha järeldust, et ehitatud ühendused, kasutades Profibus tehnoloogiat, ei vasta nõuetele järgmise põhjusena: 1. Ehitatud võrk ei vasta „Installation Guideline for PROFIBUS-DP/FMS“ dokumendile. 2. Ehitatud võrk ei vasta kvaliteetse PROFIBUS-i ehitamise põhireeglile. 3. Biokatlamaja ehitatud võrk ei vasta järgmistele nõuetele: a. Profibus DP kaablid jooksevad paralleelselt jõukaablitega samas rennis, eraldamata. b. Kõikides kilpides on Profibus DP kaablid kilpi sisenedes varje potensiaaliühtlustus tegemata. c. Kilpide +UV10.1, +UV10.2 ja +UV10.3 potensiaalid ühtlustamata. d. EMC nõuete mittetäitmine on avaldatud graafikutel (fail Tapa 7MV biokütuse katlamaja_katlamaja osa.pdf) märgatavalt järgnevate "Slave"de juures 8, 9, 10. Samuti on seda näha signaali ülemise ja alumise nivoo juures. 4. Õlikatlamaja ehitatud võrk ei vasta järgmistele nõuetele: a. Profibus DP kaablid jooksevad paralleelselt jõukaablitega samas rennis, eraldamata. b. Kõikides kilpides on Profibus DP kaablid kilpi sisenedes varje potensiaaliühtlustus tegemata. c. Kilpide +UV30, +UV31.2 ja +UV31.1 potensiaalid omavahel ühtlustamata. d. Lahendamata on kahe maja vaheline liigpingekaitse. e. EMC nõuete mittetäitmine avaldub tulpdiagrammil (fail Tapa 7MV biokütuse katlamaja_õlikütte katlamaja osa.pdf) lubatust madalama signaalinivoona "slave"del 6, 7, 8. Samuti on see näha graafikutel mitte nelinurksignaalina. On jäänud kontrollimata Profibus kaabli lõppühendused, kuna katlamajad olid töörežiimis. Profibus kaabli ühendused peavad olema teostatud vastavalt tootja nõuetele, kasutades eritööriistad. Ülaltoodud vaadates, saab järeldada, et Profibus võrk vajab kohest parandamist. Omalt poolt soovitame peatuda katlamajade töötamist, kuna nende praegune töö on avariiohtlik. Lugupidamisega, Sergei Lištsina Projektijuht OÜ PLUVO registrikood 10089320 Laki 6a, 10621 Tallinn, Eesti Tel/faks: 660 7008 E-post: [email protected] Kvaliteetse PROFIBUS-i võrgu rajamisel tuleb kinni pidada alljärgnevatest reeglitest. Pange tähele, et siia on kogutud ainult põhireeglid. Tutvuge PI International soovitustega:  PROFIBUS Installation Guideline for Cabling and Assembling  PROFIBUS Installation Guideline for Commissioning  PROFIBUS. Technical Guideline. Installation Guideline for PROFIBUS-DP/FMS  PROFIBUS Recommendation for Cabling and Assembly  PROFIBUS Installation Recommendation for Commissioning Laadige alla viimased soovitused http://www.profibus.com/downloads/ 1. Tuleb kasutada ainult PROFIBUS-i võrkude rajamiseks mõeldud pistikuid. Mõlemad juhtmed ja varjestus peavad olema korralikult ja kindlalt ühendatud. Varje peab olema ühendatud juhtme MÕLEMAS otsast. Sissetulev juhe ühendatakse klemmidega A1 (roheline juhe) ja B1 (punane juhe). Väljuv juhe tuleb ühendada klemmidega A2 (roheline juhe) ja B2 (punane juhe). Pistikus olev lüliti asendis ON termineerib sissetuleva signaali ning A2 ja B2 väljundisse signaali ei edastata. Kui seadmel on PROFIBUS-i võrgu ühendamiseks klemmid, siis varjet EI TOHI kokku keerata ühendamaks otse maandusklemmi alla, vaid tuleb kasutada juhtmega klambrit. Varje kokkukeeramisel te tekitate kõrgsageduse infovahetuse süsteemis induktiivse takistuse. 2. Installatsioonis tuleb kasutada ainult PROFIBUS-i jaoks mõeldud kaableid. Ühes installatsioonis tuleb hoiduda erinevate kaablitüüpide kasutamisest, kuna nende elektrilised omadused on erinevad. 3. Kui kasutate kiuliste soontega kaablit, siis ei tohi kasutada kiirühendusega pistikuid (FastConnect), vaid ainult kruviühendusega. Kruvide alla ühendatavad juhtmed V 2.0.ET, Detsember 2011 Leht 1 (7) peavad olema hülsi sees, kiudusid ei tohi omavahel keerutada (tekitate pooli) ning nad peavad olema hülsiga sama pikad. 4. Tulenevalt EIA-485 liidese elektrilisest võimsusest ei tohi ühes elektrilises segmendis olla üle 32 seadme. Suurema arvu seadmete ühendamiseks tuleb kasutada repiiterit või optilist osa. 5. 32 seadmega elektrilise segmendi pikkus sõltub valitud edastuskiirusest ning ei tohi ületada tabelis toodud pikkusi. Kiirus 9,6K 19,2K 45,45K 93,75K 187,5K 500K 1,5M 3M 6M 12M Pikkus 1200 1200 1200 1200 1000 400 200 100 100 100 (m) 6. Optiliste kaablite maksimaalne pikkus oleneb nende tüübist Pikkus Kaabli tüüp Kiu läbimõõt Lainepikkus kuni 100 m Plastik 980/1000 μm 650 nm kuni 500 m PCF või HCS 200/230 μm 650 nm kuni 3 km Multimode klaas 50/125 μm 860 nm 62.5/125 μm kuni 15 km Single mode klaas 10/125 μm 1300 nm V 2.0.ET, Detsember 2011 Leht 2 (7) 7. Tulenevalt EIA-485 liidese elektrilistest omadustest kahe seadme vahelise PROFIBUS-i kaabli MIINIMUMPIKKUS peab olema 1 m. Kui elektriline segment koosneb ainult kahest seadmest, siis kaabli miinimumpikkus on 2 m. 8. PROFIBUS DP on jadavõrk – kaabel jookseb seadmelt seadmele. Tuleb hoiduda kõrvalviikude kasutamisest. Igal juhul nende kogupikkus ja mahtuvus ei tohi ületada järgnevaid väärtusi: a. kiirus kuni 19,2K – 600 m ja 15 nF b. kiirus 93,75K – 100 m ja 3,0 nF c. kirus 187,5K – 33 m ja 1,0 nF d. kiirus 500K – 20 m ja 0,6 nF e. kiirus 1,5M – 6,6 m ja 0,2 nF f. suuremate kiiruste korral kõrvaliigud (ka programmeerimisseadmete omad) ei ole lubatud 9. Lainepeegelduste vältimiseks PROFIBUS-i elektriline segment peab olema termineeritud MÕLEMAST otsast. Kui võrgu otsas on seadmed, millede toide võib kaduda (näiteks sagedusmuundurid), siis termineerimiseks tuleb kasutada aktiivseid terminaatoreid. Termineerimise kadumine tekitab lainete peegeldust kaabli otstest, peegeldunud signaal interfereerub põhisignaaliga ning tagajärjeks võib olla andmete edastuse katkemine. V 2.0.ET, Detsember 2011 Leht 3 (7) 10. Kõik PROFIBUS-i seadmetega elektrikilbid peavad olema korralikult maandatud. Maandatud peavad olema ka kõik PROFIBUS-i seadmed ja kaablite redelid. 11. PROFIBUS-i seadmetega elektrikilpide vahel paralleelselt elektrilise PROFIBUS-i kaablile peab olema paigaldatud potentsiaali ühtlustamise kaabel. Seda nõuab standard IEC 61000-5-2:1997. Potentsiaali ühtlustamise kaabli ristlõige peab minimaalselt olema 6 mm² vaske, või 16 mm² alumiiniumit, või 50 mm² terast. V 2.0.ET, Detsember 2011 Leht 4 (7) Väga probleemsetes kohtades kasutatakse ka mahtuvusliku maandamist koos repiiteriga. 12. Paralleelselt jooksvate PROFIBUS-i ja muude kaablite minimaalne vahe peab vastama järgmistele nõuetele: a. jõukaablid 60...400 V DC või 25...400 V AC - 10 cm. b. jõukaablid >400 V DC või AC ja telefonikaablid - 20 cm. c. õuest tulevad ning äikese ohuga kaablid - 50 cm. Teatud mööndusega võib sellest nõudest mööda hiilida, kui paigaldate PROFIBUS-i kaabli metallist karbikusse. 13. Hoonetest väljuvate kaablite korral peavad olema kasutatud ülepinge- ja välgukaitsmed. Hoonete vahel on targem kasutada optilist ühendust. Pidage meeles, et repiiter isoleerib segmentida A ja B sooned, varjed on alati koos. V 2.0.ET, Detsember 2011 Leht 5 (7) 14. PROFIBUS-i kaabli varje peab olema maandatud elektrikilpi sisenemise kohas. V 2.0.ET, Detsember 2011 Leht 6 (7) 15. Hoolduse ja testimise eesmärgil peab segmendis olema vähemalt üks programmeerimisseadme liidesega pistik (pildil vasakpoolne). Kui teil tekkib probleeme PROFIBUS-i võrguga või soovite testiga oma võrgu installatsiooni kvaliteeti, siis meeleldi tuleme teile appi. Võrgu kohta saate ka vastava raporti. Koostas Alar Müürisepp sertifitseeritud Siemens S7 programmeerija sertifitseeritud PROFIBUS-i insener sertifitseeritud PROFINET-i insener [email protected] tel. +372 605 2529 GSM +372 506 2357 V 2.0.ET, Detsember 2011 Leht 7 (7) ProfiTrace detailed network report Powered by: 1 General Location: Tapa 7MV biokütuse katlamaja Network name: Katlamaja osa Project details summary: Master Siemens CPU 315­2DP kilbis +UV10. Võrgus koosseisu kuuluvad veel kilbid +UV11, +UV10.1, +UV10.2 ja +UV10.3 (This text is applied by the end­customer but may not be complete. Please refer to section 'Project details' for the complete text) 2 Used tools ProfiCore serial number: 0806406862 ProfiTrace version: V2.9 3 Network properties Transmission speed: 1.5 Mbps Number of Masters: 1 Number of slaves: 8 Cycle time: Min: 3.49 ms, Avg: 4.03 ms, Max: 4.57 ms 4 Conclusion No deviations found Deviations found 5 Remarks summary Profibus DP paigaldis ei vasta nõuetele järgnevatel põhjustel: 1. Profibus DP kaablid jooksevad paraleelselt jõukaablitega samas rennis, eraldamata. 2. Kõikides kilpides on Profibus DP kaablid kilpi sisenedes varje potensiaaliühtlustus tegemata. 3. Kilpide +UV10.1, +UV10.2 ja +UV10.3 potensiaalid ühtlustamata. (This text is applied by the end­customer but may not be complete. Please refer to section 'Remarks' for the complete text) Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 1 / 24 ProfiTrace detailed network report 6 Tested subjects: 6.1 Slaves that have been lost at least one time: None 6.2 Slaves that generated diagnostics while in data exchange: None 6.3 Devices that have caused illegal responses: None 6.4 Device found on reserved address 126: None 6.5 Slaves that caused retries: None 6.6 Slaves that caused syncs: None 6.7 Parameters have been sent to the following slaves: None Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 2 / 24 ProfiTrace detailed network report 7 Project details Master Siemens CPU 315­2DP kilbis +UV10. Võrgus koosseisu kuuluvad veel kilbid +UV11, +UV10.1, +UV10.2 ja +UV10.3 8 Remarks Profibus DP paigaldis ei vasta nõuetele järgnevatel põhjustel: 1. Profibus DP kaablid jooksevad paraleelselt jõukaablitega samas rennis, eraldamata. 2. Kõikides kilpides on Profibus DP kaablid kilpi sisenedes varje potensiaaliühtlustus tegemata. 3. Kilpide +UV10.1, +UV10.2 ja +UV10.3 potensiaalid ühtlustamata. EMC nõuete mittetäitmine avaldub graafikutel märgatavalt järgnevate "Slave"­de juures 8, 9, 10. Samuti on seda näha signaali ülemise ja alumise nivoo juures. Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 3 / 24 ProfiTrace detailed network report 9 Live list 0 1 2 3 4 5 6 7 8 9 0 0 1 2 3 4 5 6 7 8 9 10 10 11 12 13 14 15 16 17 18 19 20 20 21 22 23 24 25 26 27 28 29 30 30 31 32 33 34 35 36 37 38 39 40 40 41 42 43 44 45 46 47 48 49 50 50 51 52 53 54 55 56 57 58 59 60 60 61 62 63 64 65 66 67 68 69 70 70 71 72 73 74 75 76 77 78 79 80 80 81 82 83 84 85 86 87 88 89 90 90 91 92 93 94 95 96 97 98 99 100 100 101 102 103 104 105 106 107 108 109 110 110 111 112 113 114 115 116 117 118 119 120 120 121 122 123 124 125 126 Legend: No activity 1 No activity Device is in data exchange 2 Master station Device is lost 3 Slave station Device has a parameter error Device has a configuration error Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 4 / 24 ProfiTrace detailed network report 10 Address list Address IdentNo Manufacturer Model name GSD name 2 ­ ­ Master ­ 3 ­ ­ Slave ­ 4 ­ ­ Slave ­ 5 ­ ­ Slave ­ 6 ­ ­ Slave ­ 7 ­ ­ Slave ­ 8 ­ ­ Slave ­ 9 ­ ­ Slave ­ 10 ­ ­ Slave ­ Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 5 / 24 ProfiTrace detailed network report 11 Bar graph 11.1 Segment (Segment 1) Segment type: <not set> 11.1.1 Measurement point (Measuring point 1) AB Diff voltage Segment / Measuring point: Segment 1 / Measuring point 1 (1/1): 9.0V 8.0V 7.0V 5.95 6.0V 5.31 5.29 5.32 5.23 5.24 5.19 5.32 4.93 5.0V 4.0V 3.0V 2.0V 1.0V 0.0V 2 3 4 5 6 7 8 9 10 AB Diff stable voltage Segment / Measuring point: Segment 1 / Measuring point 1 (1/1): 9.0V 8.0V 7.0V 5.84 6.0V 5.19 5.00 4.95 4.95 4.95 4.77 4.95 4.58 5.0V 4.0V 3.0V 2.0V 1.0V 0.0V 2 3 4 5 6 7 8 9 10 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 6 / 24 ProfiTrace detailed network report 12 Device details 12.1 Segment (Segment 1) Segment type: <not set> 12.1.1 Measurement point (Measuring point 1) Segment / Measuring point: Segment 1 / Measuring point 1 Address: 2 Device name: Master Device type: Master Channel: <not set> Oscilloscope image of device 2 (AB Diff voltage, Min) : 5­Apr­2017, 10:50:04 Oscilloscope image of device 2 (AB Diff voltage, Max) : 5­Apr­2017, 10:51:08 Oscilloscope image of device 2 (AB Diff voltage, Last) : 5­Apr­2017, 10:52:26 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 7 / 24 ProfiTrace detailed network report Oscilloscope image of device 2 (AB Diff stable voltage, Min) : 5­Apr­2017, 10:46:50 Oscilloscope image of device 2 (AB Diff stable voltage, Max) : 5­Apr­2017, 10:52:23 Oscilloscope image of device 2 (AB Diff stable voltage, Last) : 5­Apr­2017, 10:52:26 Address: 3 Device name: Slave Device type: Slave Channel: <not set> IdentNo: Not available Manufacturer: Not available Model name: Not available I/O length (bytes): 8 In, 3 Out Signal voltage: Min: 5.23 Volt, Max: 5.39 Volt, Last: 5.31 Volt Diag count while DX: 0 Total retry count: 0 Times lost: 0 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 8 / 24 ProfiTrace detailed network report Oscilloscope image of device 3 (AB Diff voltage, Min) : 5­Apr­2017, 10:49:17 Oscilloscope image of device 3 (AB Diff voltage, Max) : 5­Apr­2017, 10:46:30 Oscilloscope image of device 3 (AB Diff voltage, Last) : 5­Apr­2017, 10:52:26 Oscilloscope image of device 3 (AB Diff stable voltage, Min) : 5­Apr­2017, 10:49:17 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 9 / 24 ProfiTrace detailed network report Oscilloscope image of device 3 (AB Diff stable voltage, Max) : 5­Apr­2017, 10:49:46 Oscilloscope image of device 3 (AB Diff stable voltage, Last) : 5­Apr­2017, 10:52:26 Address: 4 Device name: Slave Device type: Slave Channel: <not set> IdentNo: Not available Manufacturer: Not available Model name: Not available I/O length (bytes): 28 In, 28 Out Signal voltage: Min: 5.21 Volt, Max: 5.35 Volt, Last: 5.29 Volt Diag count while DX: 0 Total retry count: 0 Times lost: 0 Oscilloscope image of device 4 (AB Diff voltage, Min) : 5­Apr­2017, 10:41:45 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 10 / 24 ProfiTrace detailed network report Oscilloscope image of device 4 (AB Diff voltage, Max) : 5­Apr­2017, 10:51:50 Oscilloscope image of device 4 (AB Diff voltage, Last) : 5­Apr­2017, 10:52:26 Oscilloscope image of device 4 (AB Diff stable voltage, Min) : 5­Apr­2017, 10:44:56 Oscilloscope image of device 4 (AB Diff stable voltage, Max) : 5­Apr­2017, 10:52:03 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 11 / 24 ProfiTrace detailed network report Oscilloscope image of device 4 (AB Diff stable voltage, Last) : 5­Apr­2017, 10:52:26 Address: 5 Device name: Slave Device type: Slave Channel: <not set> IdentNo: Not available Manufacturer: Not available Model name: Not available I/O length (bytes): 28 In, 28 Out Signal voltage: Min: 5.21 Volt, Max: 5.34 Volt, Last: 5.32 Volt Diag count while DX: 0 Total retry count: 0 Times lost: 0 Oscilloscope image of device 5 (AB Diff voltage, Min) : 5­Apr­2017, 10:43:39 Oscilloscope image of device 5 (AB Diff voltage, Max) : 5­Apr­2017, 10:51:00 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 12 / 24 ProfiTrace detailed network report Oscilloscope image of device 5 (AB Diff voltage, Last) : 5­Apr­2017, 10:52:26 Oscilloscope image of device 5 (AB Diff stable voltage, Min) : 5­Apr­2017, 10:47:25 Oscilloscope image of device 5 (AB Diff stable voltage, Max) : 5­Apr­2017, 10:52:04 Oscilloscope image of device 5 (AB Diff stable voltage, Last) : 5­Apr­2017, 10:52:26 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 13 / 24 ProfiTrace detailed network report Address: 6 Device name: Slave Device type: Slave Channel: <not set> IdentNo: Not available Manufacturer: Not available Model name: Not available I/O length (bytes): 28 In, 28 Out Signal voltage: Min: 5.17 Volt, Max: 5.30 Volt, Last: 5.23 Volt Diag count while DX: 0 Total retry count: 0 Times lost: 0 Oscilloscope image of device 6 (AB Diff voltage, Min) : 5­Apr­2017, 10:45:35 Oscilloscope image of device 6 (AB Diff voltage, Max) : 5­Apr­2017, 10:51:55 Oscilloscope image of device 6 (AB Diff voltage, Last) : 5­Apr­2017, 10:52:26 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 14 / 24 ProfiTrace detailed network report Oscilloscope image of device 6 (AB Diff stable voltage, Min) : 5­Apr­2017, 10:46:50 Oscilloscope image of device 6 (AB Diff stable voltage, Max) : 5­Apr­2017, 10:52:26 Oscilloscope image of device 6 (AB Diff stable voltage, Last) : 5­Apr­2017, 10:52:26 Address: 7 Device name: Slave Device type: Slave Channel: <not set> IdentNo: Not available Manufacturer: Not available Model name: Not available I/O length (bytes): 28 In, 28 Out Signal voltage: Min: 5.19 Volt, Max: 5.33 Volt, Last: 5.24 Volt Diag count while DX: 0 Total retry count: 0 Times lost: 0 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 15 / 24 ProfiTrace detailed network report Oscilloscope image of device 7 (AB Diff voltage, Min) : 5­Apr­2017, 10:46:10 Oscilloscope image of device 7 (AB Diff voltage, Max) : 5­Apr­2017, 10:52:16 Oscilloscope image of device 7 (AB Diff voltage, Last) : 5­Apr­2017, 10:52:26 Oscilloscope image of device 7 (AB Diff stable voltage, Min) : 5­Apr­2017, 10:44:45 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 16 / 24 ProfiTrace detailed network report Oscilloscope image of device 7 (AB Diff stable voltage, Max) : 5­Apr­2017, 10:52:25 Oscilloscope image of device 7 (AB Diff stable voltage, Last) : 5­Apr­2017, 10:52:26 Address: 8 Device name: Slave Device type: Slave Channel: <not set> IdentNo: Not available Manufacturer: Not available Model name: Not available I/O length (bytes): 2 In, 1 Out Signal voltage: Min: 5.15 Volt, Max: 5.29 Volt, Last: 5.19 Volt Diag count while DX: 0 Total retry count: 0 Times lost: 0 Oscilloscope image of device 8 (AB Diff voltage, Min) : 5­Apr­2017, 10:51:28 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 17 / 24 ProfiTrace detailed network report Oscilloscope image of device 8 (AB Diff voltage, Max) : 5­Apr­2017, 10:42:47 Oscilloscope image of device 8 (AB Diff voltage, Last) : 5­Apr­2017, 10:52:26 Oscilloscope image of device 8 (AB Diff stable voltage, Min) : 5­Apr­2017, 10:51:06 Oscilloscope image of device 8 (AB Diff stable voltage, Max) : 5­Apr­2017, 10:51:49 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 18 / 24 ProfiTrace detailed network report Oscilloscope image of device 8 (AB Diff stable voltage, Last) : 5­Apr­2017, 10:52:26 Address: 9 Device name: Slave Device type: Slave Channel: <not set> IdentNo: Not available Manufacturer: Not available Model name: Not available I/O length (bytes): 37 In, 11 Out Signal voltage: Min: 5.24 Volt, Max: 5.38 Volt, Last: 5.32 Volt Diag count while DX: 0 Total retry count: 0 Times lost: 0 Oscilloscope image of device 9 (AB Diff voltage, Min) : 5­Apr­2017, 10:49:27 Oscilloscope image of device 9 (AB Diff voltage, Max) : 5­Apr­2017, 10:49:05 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 19 / 24 ProfiTrace detailed network report Oscilloscope image of device 9 (AB Diff voltage, Last) : 5­Apr­2017, 10:52:26 Oscilloscope image of device 9 (AB Diff stable voltage, Min) : 5­Apr­2017, 10:41:40 Oscilloscope image of device 9 (AB Diff stable voltage, Max) : 5­Apr­2017, 10:51:56 Oscilloscope image of device 9 (AB Diff stable voltage, Last) : 5­Apr­2017, 10:52:26 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 20 / 24 ProfiTrace detailed network report Address: 10 Device name: Slave Device type: Slave Channel: <not set> IdentNo: Not available Manufacturer: Not available Model name: Not available I/O length (bytes): 2 In, 1 Out Signal voltage: Min: 4.90 Volt, Max: 5.03 Volt, Last: 4.93 Volt Diag count while DX: 0 Total retry count: 0 Times lost: 0 Oscilloscope image of device 10 (AB Diff voltage, Min) : 5­Apr­2017, 10:50:54 Oscilloscope image of device 10 (AB Diff voltage, Max) : 5­Apr­2017, 10:51:54 Oscilloscope image of device 10 (AB Diff voltage, Last) : 5­Apr­2017, 10:52:26 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 21 / 24 ProfiTrace detailed network report Oscilloscope image of device 10 (AB Diff stable voltage, Min) : 5­Apr­2017, 10:47:17 Oscilloscope image of device 10 (AB Diff stable voltage, Max) : 5­Apr­2017, 10:42:27 Oscilloscope image of device 10 (AB Diff stable voltage, Last) : 5­Apr­2017, 10:52:26 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 22 / 24 ProfiTrace detailed network report End of report Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 23 / 24 ProfiTrace detailed network report (This page is intentionally left blank) Disclaimer PROCENTEC makes no warranty whatsoever regarding the completeness, quality, or adequacy of this automatically generated document. By using this document, you assume the risk that the content in this document may be inaccurate, incomplete or may not meet your needs and requirements. Because we constantly improve our products, the right is therefore reserved to modify the generated results without prior notice. IN NO EVENT WILL PROCENTEC BE LIABLE FOR ANY DIRECT OR INDIRECT DAMAGES THAT ORIGINATE FROM THE USE OF THIS DOCUMENT. Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:02 Signature: Page 24 / 24 ProfiTrace detailed network report Powered by: 1 General Location: Tapa 7MV biokütuse katlamaja Network name: Õlikatla katlamaja osa Project details summary: Master Siemens CPU 315­2DP kilbis +UV30. Võrgus koosseisu kuuluvad veel kilbid +UV31, +UV31.1. (This text is applied by the end­customer but may not be complete. Please refer to section 'Project details' for the complete text) 2 Used tools ProfiCore serial number: 0806406862 ProfiTrace version: V2.9 3 Network properties Transmission speed: 187.5 kbps Number of Masters: 1 Number of slaves: 6 Cycle time: Min: 26.07 ms, Avg: 29.40 ms, Max: 32.74 ms 4 Conclusion No deviations found Deviations found 5 Remarks summary Profibus DP paigaldis ei vasta nõuetele järgnevatel põhjustel: 1. Profibus DP kaablid jooksevad paraleelselt jõukaablitega samas rennis, eraldamata. 2. Kõikides kilpides on Profibus DP kaablid kilpi sisenedes varje potensiaaliühtlustus tegemata. 3. Kilpide +UV30, +UV31.2 ja +UV31.1 potensiaalid omavahelühtlustamata. (This text is applied by the end­customer but may not be complete. Please refer to section 'Remarks' for the complete text) Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 1 / 20 ProfiTrace detailed network report 6 Tested subjects: 6.1 Slaves that have been lost at least one time: None 6.2 Slaves that generated diagnostics while in data exchange: None 6.3 Devices that have caused illegal responses: None 6.4 Device found on reserved address 126: None 6.5 Slaves that caused retries: None 6.6 Slaves that caused syncs: None 6.7 Parameters have been sent to the following slaves: None Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 2 / 20 ProfiTrace detailed network report 7 Project details Master Siemens CPU 315­2DP kilbis +UV30. Võrgus koosseisu kuuluvad veel kilbid +UV31, +UV31.1. 8 Remarks Profibus DP paigaldis ei vasta nõuetele järgnevatel põhjustel: 1. Profibus DP kaablid jooksevad paraleelselt jõukaablitega samas rennis, eraldamata. 2. Kõikides kilpides on Profibus DP kaablid kilpi sisenedes varje potensiaaliühtlustus tegemata. 3. Kilpide +UV30, +UV31.2 ja +UV31.1 potensiaalid omavahelühtlustamata. Lahendamata on kahe maja vaheline liigpingekaitse EMC nõuete mittetäitmine avaldub tulpdiagrammil lubatust madalama signaalinivoona "slave"­del 6, 7, 8. Samuti on see näha graafikutel mitte nelinurksignaalina. Võrk vajaks kohest parandamist. Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 3 / 20 ProfiTrace detailed network report 9 Live list 0 1 2 3 4 5 6 7 8 9 0 0 1 2 3 4 5 6 7 8 9 10 10 11 12 13 14 15 16 17 18 19 20 20 21 22 23 24 25 26 27 28 29 30 30 31 32 33 34 35 36 37 38 39 40 40 41 42 43 44 45 46 47 48 49 50 50 51 52 53 54 55 56 57 58 59 60 60 61 62 63 64 65 66 67 68 69 70 70 71 72 73 74 75 76 77 78 79 80 80 81 82 83 84 85 86 87 88 89 90 90 91 92 93 94 95 96 97 98 99 100 100 101 102 103 104 105 106 107 108 109 110 110 111 112 113 114 115 116 117 118 119 120 120 121 122 123 124 125 126 Legend: No activity 1 No activity Device is in data exchange 2 Master station Device is lost 3 Slave station Device has a parameter error Device has a configuration error Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 4 / 20 ProfiTrace detailed network report 10 Address list Address IdentNo Manufacturer Model name GSD name 2 ­ ­ Master ­ 3 ­ ­ Slave ­ 4 ­ ­ Slave ­ 5 ­ ­ Slave ­ 6 ­ ­ Slave ­ 7 ­ ­ Slave ­ 8 ­ ­ Slave ­ Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 5 / 20 ProfiTrace detailed network report 11 Bar graph 11.1 Segment (Segment 1) Segment type: <not set> 11.1.1 Measurement point (Measuring point 1) AB Diff voltage Segment / Measuring point: Segment 1 / Measuring point 1 (1/1): 9.0V 8.0V 7.0V 6.06 6.0V 5.45 5.38 5.32 5.15 5.40 5.18 5.0V 4.0V 3.0V 2.0V 1.0V 0.0V 2 3 4 5 6 7 8 AB Diff stable voltage Segment / Measuring point: Segment 1 / Measuring point 1 (1/1): 9.0V 8.0V 7.0V 5.84 6.0V 5.14 5.0V 4.44 4.21 4.0V 3.0V 2.01 1.82 1.96 2.0V 1.0V 0.0V 2 3 4 5 6 7 8 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 6 / 20 ProfiTrace detailed network report 12 Device details 12.1 Segment (Segment 1) Segment type: <not set> 12.1.1 Measurement point (Measuring point 1) Segment / Measuring point: Segment 1 / Measuring point 1 Address: 2 Device name: Master Device type: Master Channel: <not set> Oscilloscope image of device 2 (AB Diff voltage, Min) : 5­Apr­2017, 11:21:13 Oscilloscope image of device 2 (AB Diff voltage, Max) : 5­Apr­2017, 11:19:35 Oscilloscope image of device 2 (AB Diff voltage, Last) : 5­Apr­2017, 11:22:29 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 7 / 20 ProfiTrace detailed network report Oscilloscope image of device 2 (AB Diff stable voltage, Min) : 5­Apr­2017, 11:22:28 Oscilloscope image of device 2 (AB Diff stable voltage, Max) : 5­Apr­2017, 11:14:22 Oscilloscope image of device 2 (AB Diff stable voltage, Last) : 5­Apr­2017, 11:22:29 Address: 3 Device name: Slave Device type: Slave Channel: <not set> IdentNo: Not available Manufacturer: Not available Model name: Not available I/O length (bytes): 7 In, 3 Out Signal voltage: Min: 5.42 Volt, Max: 5.50 Volt, Last: 5.45 Volt Diag count while DX: 0 Total retry count: 0 Times lost: 0 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 8 / 20 ProfiTrace detailed network report Oscilloscope image of device 3 (AB Diff voltage, Min) : 5­Apr­2017, 11:21:16 Oscilloscope image of device 3 (AB Diff voltage, Max) : 5­Apr­2017, 11:20:36 Oscilloscope image of device 3 (AB Diff voltage, Last) : 5­Apr­2017, 11:22:30 Oscilloscope image of device 3 (AB Diff stable voltage, Min) : 5­Apr­2017, 11:14:22 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 9 / 20 ProfiTrace detailed network report Oscilloscope image of device 3 (AB Diff stable voltage, Max) : 5­Apr­2017, 11:19:58 Oscilloscope image of device 3 (AB Diff stable voltage, Last) : 5­Apr­2017, 11:22:30 Address: 4 Device name: Slave Device type: Slave Channel: <not set> IdentNo: Not available Manufacturer: Not available Model name: Not available I/O length (bytes): 80 In, 32 Out Signal voltage: Min: 5.36 Volt, Max: 5.41 Volt, Last: 5.38 Volt Diag count while DX: 0 Total retry count: 0 Times lost: 0 Oscilloscope image of device 4 (AB Diff voltage, Min) : 5­Apr­2017, 11:22:00 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 10 / 20 ProfiTrace detailed network report Oscilloscope image of device 4 (AB Diff voltage, Max) : 5­Apr­2017, 11:14:31 Oscilloscope image of device 4 (AB Diff voltage, Last) : 5­Apr­2017, 11:22:30 Oscilloscope image of device 4 (AB Diff stable voltage, Min) : 5­Apr­2017, 11:20:41 Oscilloscope image of device 4 (AB Diff stable voltage, Max) : 5­Apr­2017, 11:14:28 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 11 / 20 ProfiTrace detailed network report Oscilloscope image of device 4 (AB Diff stable voltage, Last) : 5­Apr­2017, 11:22:30 Address: 5 Device name: Slave Device type: Slave Channel: <not set> IdentNo: Not available Manufacturer: Not available Model name: Not available I/O length (bytes): 9 In, 3 Out Signal voltage: Min: 5.29 Volt, Max: 5.58 Volt, Last: 5.32 Volt Diag count while DX: 0 Total retry count: 0 Times lost: 0 Oscilloscope image of device 5 (AB Diff voltage, Min) : 5­Apr­2017, 11:20:46 Oscilloscope image of device 5 (AB Diff voltage, Max) : 5­Apr­2017, 11:20:28 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 12 / 20 ProfiTrace detailed network report Oscilloscope image of device 5 (AB Diff voltage, Last) : 5­Apr­2017, 11:22:29 Oscilloscope image of device 5 (AB Diff stable voltage, Min) : 5­Apr­2017, 11:21:16 Oscilloscope image of device 5 (AB Diff stable voltage, Max) : 5­Apr­2017, 11:22:28 Oscilloscope image of device 5 (AB Diff stable voltage, Last) : 5­Apr­2017, 11:22:29 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 13 / 20 ProfiTrace detailed network report Address: 6 Device name: Slave Device type: Slave Channel: <not set> IdentNo: Not available Manufacturer: Not available Model name: Not available I/O length (bytes): 80 In, 0 Out Signal voltage: Min: 5.10 Volt, Max: 5.21 Volt, Last: 5.15 Volt Diag count while DX: 0 Total retry count: 0 Times lost: 0 Oscilloscope image of device 6 (AB Diff voltage, Min) : 5­Apr­2017, 11:21:05 Oscilloscope image of device 6 (AB Diff voltage, Max) : 5­Apr­2017, 11:22:05 Oscilloscope image of device 6 (AB Diff voltage, Last) : 5­Apr­2017, 11:22:30 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 14 / 20 ProfiTrace detailed network report Oscilloscope image of device 6 (AB Diff stable voltage, Min) : 5­Apr­2017, 11:14:26 Oscilloscope image of device 6 (AB Diff stable voltage, Max) : 5­Apr­2017, 11:20:46 Oscilloscope image of device 6 (AB Diff stable voltage, Last) : 5­Apr­2017, 11:22:30 Address: 7 Device name: Slave Device type: Slave Channel: <not set> IdentNo: Not available Manufacturer: Not available Model name: Not available I/O length (bytes): 28 In, 0 Out Signal voltage: Min: 5.35 Volt, Max: 5.46 Volt, Last: 5.40 Volt Diag count while DX: 0 Total retry count: 0 Times lost: 0 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 15 / 20 ProfiTrace detailed network report Oscilloscope image of device 7 (AB Diff voltage, Min) : 5­Apr­2017, 11:21:44 Oscilloscope image of device 7 (AB Diff voltage, Max) : 5­Apr­2017, 11:19:51 Oscilloscope image of device 7 (AB Diff voltage, Last) : 5­Apr­2017, 11:22:29 Oscilloscope image of device 7 (AB Diff stable voltage, Min) : 5­Apr­2017, 11:22:28 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 16 / 20 ProfiTrace detailed network report Oscilloscope image of device 7 (AB Diff stable voltage, Max) : 5­Apr­2017, 11:20:50 Oscilloscope image of device 7 (AB Diff stable voltage, Last) : 5­Apr­2017, 11:22:29 Address: 8 Device name: Slave Device type: Slave Channel: <not set> IdentNo: Not available Manufacturer: Not available Model name: Not available I/O length (bytes): 28 In, 40 Out Signal voltage: Min: 5.14 Volt, Max: 5.24 Volt, Last: 5.18 Volt Diag count while DX: 0 Total retry count: 0 Times lost: 0 Oscilloscope image of device 8 (AB Diff voltage, Min) : 5­Apr­2017, 11:21:06 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 17 / 20 ProfiTrace detailed network report Oscilloscope image of device 8 (AB Diff voltage, Max) : 5­Apr­2017, 11:20:13 Oscilloscope image of device 8 (AB Diff voltage, Last) : 5­Apr­2017, 11:22:30 Oscilloscope image of device 8 (AB Diff stable voltage, Min) : 5­Apr­2017, 11:22:19 Oscilloscope image of device 8 (AB Diff stable voltage, Max) : 5­Apr­2017, 11:22:17 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 18 / 20 ProfiTrace detailed network report Oscilloscope image of device 8 (AB Diff stable voltage, Last) : 5­Apr­2017, 11:22:30 Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 19 / 20 ProfiTrace detailed network report End of report Disclaimer PROCENTEC makes no warranty whatsoever regarding the completeness, quality, or adequacy of this automatically generated document. By using this document, you assume the risk that the content in this document may be inaccurate, incomplete or may not meet your needs and requirements. Because we constantly improve our products, the right is therefore reserved to modify the generated results without prior notice. IN NO EVENT WILL PROCENTEC BE LIABLE FOR ANY DIRECT OR INDIRECT DAMAGES THAT ORIGINATE FROM THE USE OF THIS DOCUMENT. Usage of this document is only permitted if the disclaimer on the last page has been accepted. Name: Aldo Kaljumäe Company: Saksa Automaatika OÜ 5.04.2017 11:22 Signature: Page 20 / 20 ® PROCESS FIELD BUS PROFIBUS Technical Guideline Installation Guideline for PROFIBUS-DP/FMS Version 1.0 September 1998 PROFIBUS Guideline, Order No. 2.112 PROFIBUS Guideline, Order No. 2.112 Installation Guideline for PROFIBUS-DP/FMS Version 1.0 September 1998 Published by: PROFIBUS Nutzerorganisation e.V. Haid-und-Neu-Str. 7 D-76131 Karlsruhe Phone: ++ 721 / 96 58 590 Fax: ++ 721 / 96 58 589 e-mail: [email protected] http://www.profibus.com No part of this publication may be reproduced or uitilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from the publisher. © PNO 1998 - Copyright - all rights reserved Printed in Germany Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 Table of Contents 1 Introduction . .................................................................................................................................... 2 2 Planning a PROFIBUS installation . ............................................................................................... 2 2.1 General information ................................................................................................................... 2 2.2 PROFIBUS layer 1 (Physical Layer) .......................................................................................... 3 2.2.1 Choice of PROFIBUS data transfer cable type.................................................................................4 2.2.2 Bus stub lines ...................................................................................................................................5 2.2.3 Bus termination to EN 50170 Volume 2............................................................................................5 2.2.4 Bus connectors and PROFIBUS-DP/FMS interface .........................................................................5 2.2.5 Power supply for the terminating resistors........................................................................................7 3 Cable laying regulations for PROFIBUS ...................................................................................... 8 3.1 Laying of copper cable .............................................................................................................. 8 3.1.1 Laying cables within control cabinets ...............................................................................................8 3.1.2 Laying cables outside of control cabinets.......................................................................................10 3.1.3 Laying cables outside of buildings..................................................................................................10 3.1.4 Potential equalization and screening ..............................................................................................11 3.2 Choice of cables and bus connectors ..................................................................................... 11 3.3 Design of an installation with grounded reference voltage ...................................................... 12 3.4 Design of an installation with non-grounded reference voltage ............................................. 13 3.5 Connecting up a repeater ........................................................................................................ 13 4 Commissioning of PROFIBUS equipment.................................................................................. 14 4.1 Testing the PROFIBUS bus cable and bus connectors........................................................... 14 4.2 Determining the loop resistance .............................................................................................. 17 4.3 Testing for correct bus termination .......................................................................................... 18 4.4 Determining the segment length and cable route.................................................................... 18 4.5 Other test methods .................................................................................................................. 19 5 Equipment report .......................................................................................................................... 20 6 Test and diagnostics equipment................................................................................................. 22 7 Further information ...................................................................................................................... 22 © PNO 1998, Copyright - All Rights Reserved Page 1 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 1 Introduction The information contained in this document applies to PROFIBUS-DP and PROFIBUS-FMS systems. It describes common procedures to follow when specifying a PROFIBUS installation which have proven to be effective in practice. However, it is also necessary to observe the specific installation instructions from the suppliers of the fieldbus devices and to comply with the relevant safety guidelines. This manual does not cover PROFIBUS-PA, which is for intrinsically safe systems. Different guidelines apply to installation in areas subject to explosion hazards. To bridge large distances as well as in wide area applications (galvanic isolation, lightning strikes) the use of fiber optical cables is recommended for data transmission. The following installation guidelines only apply to data transfer using copper cables (RS 485) to EN 50170. Furthermore, operators of PROFIBUS equipment are strongly recommended only to use fieldbus devices and components which have been certified by the PROFIBUS User Organization e.V. (PNO). Certified products have undergone extensive tests carried out by specialists to demonstrate their compliance to the PROFIBUS standard EN 50170 in combination with PROFIBUS devices from other manufacturers. PROFIBUS 1 data transfer is based on the RS 485 standard . The relevant features for use with PROFIBUS-DP/FMS are described in EN 50170 and reflected in the following practical examples. Data transfer using fiber optical cables is also described briefly for the sake of completeness. 2 Planning a PROFIBUS installation In addition to installation and constructional factors which are largely determined by the location of each of the machines and fieldbus devices, when planning the installation it is also necessary to observe the physical regulations for PROFIBUS equipment as described in EN 50170. 2.1 General information Table 2-1, which contains general information on dimensioning a PROFIBUS installation, includes important parameters for plant designers. As described in the PROFIBUS RS485 specification, each bus segment can have a maximum of 32 active devices. In order to be able to connect a larger number of PROFIBUS DP/FMS stations, it is necessary to segment the bus. The segments are then interconnected with repeaters which amplify and refresh the data signals. Repeaters can also be used for galvanic isolation of bus segments or bus sections. Each repeater allows the PROFIBUS system to be extended by an additional bus segment with the maximum admissible cable length and the maximum number of fieldbus devices (see Table 2-1). Repeaters increase the signal propagation times. This should be taken into account during planning. 1 EIA RS 485 = Electrotechnical Association, multi-point interfaces. © PNO 1998, Copyright - All Rights Reserved Page 2 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 Maximum number of stations participating in DP: 126 (addresses from 0 .. 125) the exchange of user data FMS: 127 (addresses from 0 .. 126) Maximum number of stations per segment 32 including repeaters Available data transfer rates in kbit/s 9.6, 19.2, 45.45, 93.75, 187.5, 500, 1500, 3000, 6000, 12000 Max. number of segments in series According to EN 50170, a maximum of 4 repeaters are allowed between any two stations. Dependent on the repeater type and manufacturer, more than 4 repeaters are allowed in some cases. Refer to the manufacturer’s technical specification for details. Table 2-1: General information on planning a PROFIBUS installation M Bus master Segment 1 R S Segment 2 R S S Segment 3 S S Legende: Slave without bus Repeater with bus Slave with bus S termination resistor S termination resistor R termination resistor Repeater without bus R termination resistor Figure 2-1: Segmenting of a PROFIBUS installation Figure 2-1 illustrates the layout and segmenting of an example PROFIBUS installation which uses repeaters. Repeaters with galvanic isolation can be used. 2.2 PROFIBUS layer 1 (Physical Layer) PROFIBUS layer 1 describes the data transmission technology, the pin assignments of the bus connectors and the technical parameters to be complied with. It also contains rules on the design of PROFIBUS-DP/FMS devices with respect to bus physics. © PNO 1998, Copyright - All Rights Reserved Page 3 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 2.2.1 Choice of PROFIBUS data transfer cable type Depending on the application, the user can choose between electrical and optical fiber data transfer cables. The following types of electrical data cables can be used: • Standard bus cable • Standard bus cable with halogen-free sheath (type FRNC) • Cable with PE sheath for use in the food and drug manufacturing industries (it differs from the standard bus cable solely in the cable sheath). • Direct buried cable with additional protective sheath for laying in the ground. • Trailing cable (this is a special cable type which is used where parts of the machine move occasionally or continuously). • Festooned cable. Compared to a trailing cable, a festooned cable has an additional strain relief element. The bus cable is specified in EN 50170 part 8-2 as "Cable Type A", and should comply with the parameters in the following table. Cable Type B, which is also described in EN 50170, is outdated and should no longer be used. Table 2-2 shows the parameters for standard type A bus cables. Parameter Cable type A Characteristic impedance in Ω 135 ... 165 at a frequency of (3...20 MHz) Operating capacity (pF/m) < 30 Loop resistance (Ω/km) < =110 Core diameter (mm) > 0.64 *) Core cross-section (mm²) > 0.34 *) Table 2-2: Bus cable parameters *) The cable cross-sections used should be compatible with the mechanical specifications of the bus interface connector The cable parameters specified for standard Type A bus cables result in the maximum length of each bus segment for the respective data transfer rate shown in Table 2-3. Data transfer rate in 9.6 19.2 45.45 93.75 187.5 500 1500 3000 6000 12 000 kbit/s Max. segment length 1200 1200 1200 1200 1000 400 200 100 100 100 in m Table 2-3: Maximum cable lengths per segment Important: In a PROFIBUS-DP/FMS installation, you must choose a data transfer rate which is supported by all devices connected to the bus. The chosen data transfer rate then determines the maximum segment lengths as shown above. The maximum admissible distance between two bus stations in each PROFIBUS network can be calculated as follows: (NO_REP + 1) * Segment length NO_REP= The maximum number of repeaters connected in series (depends on repeater type). © PNO 1998, Copyright - All Rights Reserved Page 4 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 Example: The repeater manufacturer’s specifications allow nine repeaters to be connected in series. The maximum distance between two bus stations at a data transfer rate of 1500 kbit/s is then as follows: (9 + 1) * 200 m = 2000 m 2.2.2 Bus stub lines The use of passive bus stub lines should be avoided. Programming and diagnostic devices which are attached to the bus e.g. during commissioning are generally connected using their own cable which acts as a bus tap-off cable. In such cases, you should use active bus tap-off devices (e.g. bus terminals, repeaters, active cables etc.). Bustermination Bustermination Diagnostic device Figure 2-2: Connecting a diagnostic device to the bus using an active bus terminal/repeater 2.2.3 Bus termination to EN 50170 Volume 2 In order to minimize cable reflections and ensure a defined noise level on the data lines, the data transfer cable must be terminated at both ends with a terminating resistor combination as follows. VP (pin 6) 390 Ohm B-line (pin 3) 220 Ohm A-line (pin 8) 390 Ohm DGND (pin 5) Figure 2-3: Cable termination of the PROFIBUS cable to EN 50170 (pin numbers for a 9-pin SUB-D connector) 2.2.4 Bus connectors and PROFIBUS-DP/FMS interface A bus connector is used to connect the bus cable to the PROFIBUS device. Bus connectors are available with a variety of protection classes and mechanical designs. The choice of connector is © PNO 1998, Copyright - All Rights Reserved Page 5 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 mainly determined by the space available in the vicinity of the PROFIBUS device (i.e. PC interface, PLC or special fieldbus device). EN 50170 Volume 2 recommends the use of a 9-pin Sub-D connector. Depending on the required protection class and the application of the fieldbus device, other connector designs are also allowed. Table 2-4 shows the pin assignment if a 9-pin Sub-D connector is used: Pin no. Signal Significance 1 Shield Shield/functional ground 2 M24 Ground for +24 V output voltage 3 RxD/TxD-P *) Receive/Transmit data – plus (B wire) 4 CNTR-P Repeater control signal (direction control), RTS signal 5 DGND *) Data ground (reference potential for VP) 6 VP *) Supply voltage - plus (P5V) 7 P24 Output voltage +24 V 8 RxD/TxD-N *) Receive/Transmit data – minus (A wire) 9 CNTR-N Repeater control signal (direction control) *) Signals marked in bold and with an asterisk are mandatory and must be provided. Other signals are optional. Figure 2-4: Pin assignments of a 9-pin Sub-D connector for a fieldbus device All fieldbus devices which use a standard 9-pin Sub-D connector should provide the the VP and DGND signals on the bus connector in addition to the receive and transmit signals. With all other connector types, only the receive and transmit signals need to be connected. Make sure that the connector type used is suitable for the selected baud rate. If optional signals are provided, they must also comply with EN 50170 Volume 2 and they must be correctly described in the respective GSD file. To prevent EMC interference from entering the device, the cable shield should be connected to the 1) functional ground of the device (generally the electrically conductive case). This is done by connecting the cable shield to the metal case of the Sub-D connector and the functional ground over a large area. The bus connector must have a low-impedance connection to the cable shield. The data transfer technology of the serial bus system, which uses a shielded twisted pair data cable, is described in the specification of the interference-immune RS 485 interface standard. To allow correct bus termination, each station must connect the signals DGND and VP (5 V) to pins 5 and 6 of the connector, respectively. The 5 V supply for the terminating resistors (VP) should have a minimum current rating of 10 mA (the current load can increase to 12 mA if a NULL signal is sent through the bus).The current rating should be increased to app. 90 mA if you need to be able to supply other types of devices on the bus such as bus terminals and optical fiber cable drivers. 1) The electrical equipment in a plant is generally connected to a functional ground. It is used to lead away potential equalization and interference currents and to ensure compliance with EMC regulations and should thus be installed with regard to the requirements of high frequency currents. © PNO 1998, Copyright - All Rights Reserved Page 6 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 Due to the capacitive load of the station and the resulting cable reflections, bus connectors should be provided with built-in series inductors as shown below. B AB A Bus connector 390 Ohm (schematic) 220 Ohm Conductive case 390 Ohm Inductors 9-pin male Sub-D connector Pin Nr. 5 3 8 6 Figure 2-5: Bus connector with built-in terminating resistors and series inductors Due to the built-in series inductors in the bus connectors, all bus connectors in the network should be attached to fieldbus devices to ensure that the necessary capacitive load is provided by the device input capacitance. 2.2.5 Power supply for the terminating resistors The active bus termination using a resistor combination avoids signal reflections during data transfer and ensures a defined zero-signal voltage on the data lines when none of the stations on the bus are active. Active termination must be provided at the beginning and end of each RS 485 bus segment. If the bus termination is missing, this can cause errors during data transfer. Problems can also arise if too many bus terminators are fitted since each bus terminator also represents an electrical load and reduces the signal levels and thus the signal-to-noise ratio. Too many or missing bus terminators can also cause intermittent data transfer errors, particularly if the bus segment is operated close to the specified limits for maximum numbers of stations, maximum bus segment length and maximum data transfer rate. The power required by the active bus termination is usually obtained through the bus connector from stations connected to the bus. Alternative measures must be taken if there is no guarantee that the power required by the bus termination is permanently provided while the bus is operating. For example, in a particular installation the station providing the power to the bus termination may need to be repeatedly switched off or removed from the bus for operational reasons. In such cases, the bus termination should use an external power supply or a repeater should be used for bus termination instead. © PNO 1998, Copyright - All Rights Reserved Page 7 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 3 Cable laying regulations for PROFIBUS This chapter aims to promote a general understanding of the requirements to be met during PROFIBUS installation to ensure EMC compliance. In addition, the user is still responsible for observing the valid safety and accident prevention regulations. Furthermore, the following should be read together with the manufacturer-specific guidelines. 3.1 Laying of copper cable Data transfer in PROFIBUS systems is based on a interference-immune symmetrical bus system to the RS 485 specification using shielded twisted pair cable. With correct system installation, small external sources of interference are led to ground through the cable shield without causing interference in the data lines. Interference of this type can largely be avoided with appropriate EMC measures such as EMC-compliant system installation, EMC-compliant cable laying and measures that avoid large ground potential differences. Electromagnetic interference from sources such as switching processes, rectifiers and circuit breakers can cause equipment faults to occur. In addition, overvoltage and lightning strikes can destroy electronic components in fieldbus devices. Correct operation of the plant can then no longer be guaranteed. Particularly for equipment containing frequency inverters (variable speed drives), the manufacturer’s regulations for EMC compliance must be observed for the following components: • Filters, • Chokes, and • Shielding. In addition, electronic starters should be used if fluorescent lamps are installed within control cabinets. The following cable laying instructions apply to shielded twisted pair cables. The cable shield is used to improve the immunity to electromagnetic interference. PROFIBUS cables should be shielded with a combination of both conductive braid and conductive foil. In the following, "shield" refers to both types of shields (braid and foil). A foil shield should not be used on its own, because it is very thin and can easily be damaged. The cable shield must be connected to the functional ground at both ends of the cable by making a large-area connection to a grounded conductive surface. When laying the bus cables, particular care should be taken to ensure that the cable shield (braid shield and foil shield, if available) is connected to the shield grounding clamp over a large area. The two PROFIBUS data lines are designated A and B. There are no regulations on which cable core color should be connected to which of the two data terminals on each fieldbus device; the sole requirement is to ensure that the same core color is connected to the same terminal (A or B) for all stations throughout the entire system (across all stations and bus segments). If the data transfer cable has data wires with red and green insulation, then the following assignment should be used: Data cable wire A - green Data cable wire B - red This rule applies to both the incoming and the outgoing data lines. 3.1.1 Laying cables within control cabinets If a repeater or fieldbus device is installed within a control cabinet, the cable shield of the incoming bus cable should be electrically connected to a grounding rail as close as possible to the cable lead- through using a shield grounding clamp or similar (see Figure 3-1). The cable shield should continue © PNO 1998, Copyright - All Rights Reserved Page 8 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 within the cabinet to the fieldbus device and be connected there in accordance with the manufacturer’s instructions. The following installation guidelines should be observed. Ensure that the case of the device and also the control cabinet in which the fieldbus device is mounted have the same ground potential by providing a large-area metallic contact to ground (use e.g. galvanized steel to ensure a good connection). Grounding rails should not be attached to painted surfaces. If the above measures are observed, electromagnetic interference is diverted through the cable’s shield. screen grounding clamp grounding rail close to cable lead-through cable screen functional ground Figure 3-1: Shield connection of PROFIBUS cable to a conductive surface The following rules should be followed when laying PROFIBUS cables within control cabinets. PROFIBUS cables ... and cables for ... must be laid ... • Bus signals, e.g. PROFIBUS in the same cable loom or cable duct. • Data signals for PC´s, programming devices, printers etc. • Screened analog inputs • Unscreened DC voltages (<= 60V) • Screened process signals (<= 25 V) • Unscreened AC voltages (<= 25V) • Coaxial cables for monitors • DC voltages from 60 V ... 400 V (unscreened) in separate cable looms or cable ducts without • AC voltages from 25V ... 400 V (unscreened) minimum spacing requirements • DC and AC voltages > 400 V (unscreened) in separate cable looms or cable ducts without • Telephone cables minimum spacing requirements • For areas with explosion hazard Table 3-1: Laying cables within control cabinets © PNO 1998, Copyright - All Rights Reserved Page 9 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 3.1.2 Laying cables outside of control cabinets The following rules should be followed when laying PROFIBUS cables outside of control cabinets. PROFIBUS cables ... and cables for... must be laid... • DC and AC voltages > 400 V (unscreened) in separate cable runs spaced at least 10 cm apart. • For areas with explosion hazard • Telephone cables Table 3-2: Laying cables outside of control cabinets All cable ducts should be constructed of electrically conducting material and connected to functional ground at regular intervals. Bus cables should not be subject to mechanical loads which exceed the manufacturer’s specifications. If this cannot be avoided, additional protective measures should be taken, e.g. by laying the cables in a steel pipe or rugged metal duct. The pipe or duct should then be grounded at regular intervals and protected against corrosion. 3.1.3 Laying cables outside of buildings It is recommended to use fiber optic cables for bus installations which are outside of buildings. In the case of bus cables between buildings which are laid in the ground, you should use a special fiber optic cable type which is suitable for this application. Suitable copper cable types can be used if fiber optic cables cannot be used. Observe the admissible minimum and maximum temperature rating for the type of cable used. Potential equalization Lightning protection Plastic pipe Lightning protection Potential equalization Bus cable Functional ground cable Figure 3-2: Laying bus cables outside of buildings In principle, the same rules apply to laying cables outside of buildings as within buildings. However, for outside installation, the cables should be provided with additional protection by laying them inside a suitable plastic pipe. © PNO 1998, Copyright - All Rights Reserved Page 10 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 The transition from external to internal cables should always use an auxiliary terminal block. It is used to interconnect the cable for burial in the ground with the standard bus cable. Lightning arrestors should be installed directly where the cable enters the building. In addition, the auxiliary terminal block should contain appropriate circuits to protect against overvoltages (lightning protection). 3.1.4 Potential equalization and screening The cable screen should be connected to ground at both ends of the cable. The use of fiber optic cable is recommended if problems are experienced with interference. A low impedance potential equalization cable should be used if this is not possible. Situations where interference can present a problem include: • Plant which extends over a large area • Power is fed to the plant from different power sources • Networking extends over several buildings If one of these situation apply, the following should be observed when installing the potential equalization system: • The circuit through which interference signals flow must be closed, and • Each part of the plant must be electrically connected to the potential equalization system/functional ground at as many places as possible. Electrically conducting pipes, parts of machines or supporting structures should be integrated in the potential equalization system. In order to ensure long-term reliability, appropriate measures should be undertaken to protect against corrosion. • The potential equalization cable must be protected against corrosion. • The cross-section of the potential equalization cable should be chosen with regard to the maximum potential equalization currents which can flow. Special care should be taken when installing potential equalization cables to maximize the interference immunity of the data cables. If possible, the potential equalization cable should be laid parallel to and as close as possible to the data cable (preferably in the same plastic pipe). The cable screen should never be used for potential equalization. The potential equalization cable should be finely stranded to ensure that it is also effective at high frequencies as a result of the large surface area. Control cabinet 1 Control cabinet 2 Potential Potential equalization equalization Data transfer cable Figure 3-3: EMC-compliant installation of a plant with grounded reference voltage 3.2 Choice of cables and bus connectors Choice of the appropriate cable and connector types (material, admissible temperature range, protection class, etc.) is dependent on the application. The regularly updated PROFIBUS Product © PNO 1998, Copyright - All Rights Reserved Page 11 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 Catalog which is available from the PROFIBUS User Organization contains details of approved cable and connector types. In order to be able to connect to fieldbus devices during commissioning and diagnostics through the bus (remote function), it is recommended to provide at least one bus connector per bus segment which has an interface for a programming device. Before attaching the bus connectors to the bus cable, installation personnel should get information on the mechanical design and function of the connectors. Generally speaking, the data wires are labeled A and B within the connector. Ensure that the same wire color is connected to the same terminal (A or B) for all stations throughout the entire system, both for incoming and outgoing wires (see section 3.1). The cable shield should be electrically connected to the shield grounding clamp over a large area. The shield grounding clamp should be electrically connected to the connector cover. It is recommended to check the resistance between the shield grounding clamp and the connector cover with an ohmmeter. Terminating resistors must be provided at the beginning and end of each bus segment (and only at these positions). Ensure that the signal wires do not contact the braided shield. The correct method should be used to strip the insulation from a PROFIBUS cable. Ensure that the braided cable shield makes contact over a large area and that the strain relief is fitted correctly. Observe the manufacturer's recommendations. 3.3 Design of an installation with grounded reference voltage Equipment is normally arranged as a grounded system, whereby the ground of the power feed is connected to the functional ground over a large area (Figure 3-4). As shown in Figure 3-3, the shield of the bus cable is connected to the potential equalization system over a large area where it enters the control cabinet. The potential equalization rail is grounded in each control cabinet and connected to the potential equalization rails of the other control cabinets. L1 L2 L3 N PE Fieldbus device M L+ L+ M M L+ Figure 3-4: Schematic diagram of a plant with grounded reference voltage © PNO 1998, Copyright - All Rights Reserved Page 12 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 3.4 Design of an installation with non-grounded reference voltage In exceptional circumstances, equipment can be arranged as a non-grounded system. This can be necessary if high short-circuit currents can occur (induction furnaces, etc.). In a non-grounded system, it is necessary to provide an insulation monitoring device with a voltage limiter (Figure 3-5). The term "non-grounded" is also used if an R/C circuit is fitted between ground and PE. Many devices are fitted with an R/C circuit of this type to improve the interference immunity. This should be considered when choosing the earth-leakage monitor. In addition, the non-grounded arrangement ensures that uncontrolled equalization currents do not destroy devices on the bus. The relevant safety regulations must be observed. L1 L2 L3 N PE Fieldbus device >U M L+ R/C combination in fieldbus device M Load current circuit M Figure 3-5: Schematic diagram of a plant with non-grounded reference voltage 3.5 Connecting up a repeater Choice of the appropriate repeater type is dependent on the application. The regularly updated PROFIBUS Product Guide which is available from the PROFIBUS User Organization contains details of available repeater types. Repeaters are generally supplied with power from an external power source. Repeaters should preferentially be connected as a non-grounded system to allow galvanic isolation between the two bus segments. Observe the manufacturer’s guidelines when installing the repeater. Repeaters should preferably be mounted in control cabinets on a top-hat rail. When mounting on a top- hat rail, additional grounding measures are not normally necessary if the repeater has a contact spring at the rear to ensure electrical contact to the top-hat rail. If this method of mounting is not possible, the repeater should be grounded using a large-area connection to conductive parts of the equipment. An ohmmeter should be used to ensure that the repeater has a low impedance connection to the functional ground. If the repeater is attached to one of the two ends of the segment, terminating resistors must be fitted to avoid cable reflections. © PNO 1998, Copyright - All Rights Reserved Page 13 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 4 Commissioning of PROFIBUS equipment The measurements described below allow you to test an installed network and eliminate the most common errors, such as reversal of the cable polarity, short circuits and incorrectly connected terminating resistors. The measurements should be carried out for each bus segment after installing the PROFIBUS cables and attaching the bus connectors. When laying cables, changes are often made for constructional reasons to the originally intended cable route. The following measurements are intended to document the actual physical route of the cables and the total bus length together with the lengths of each of the sections. When the bus is in operation, terminating resistors should only be fitted at each end of the bus segment. When fitting the bus connectors, the bus terminating resistors at the end of the segment are sometimes forgotten and/or additional terminating resistors are inserted within the segment. During operation, this can cause data errors due to reflections at the non-terminated cable ends and/or due to signal attenuation caused by additional resistors. According to the design of the bus connectors, terminating resistors may be permanently installed or switchable or can be disabled/enabled with jumpers. Furthermore, connectors are available both with and without series inductors. Some connector types disconnect the incoming cables from the outgoing cables when the terminating resistors are inserted. PLEASE NOTE: The following measurements are not designed to determine the cable lengths to 100 % accuracy; rathermore, the intention is solely to test for correct installation of the bus segment with the help of simple test equipment (general purpose AVO meter). The measurements assume that the same cable and connector types are used within each segment. It is recommended to document the measurements and file them for future reference, e.g. by entering the resistance values determine with the method in section 4.4 into the equipment report described in section 5. 4.1 Testing the PROFIBUS bus cable and bus connectors Data errors can occur if the PROFIBUS cable is incorrectly attached to the bus connectors. Such basic errors can be detected and remedied with the simple test method described below. The test method shown schematically in figure 4-1 allows you to detect data wires which are swapped over in the bus connectors. During the test, the bus connectors must not be connected to any PROFIBUS devices. In addition, all bus terminating resistors should be removed or disabled. The tests require two 9 pin female Sub-D test connectors. Test connector 1 is provided with a single pole changeover switch, the moving contact of which is connected to the shield (case) of the test connector. The two fixed contacts are connected to pin 3 (data wire B) and pin 8 (data wire A), respectively. Test connector 2 is used to connect an Ohmmeter to the bus. During the cable tests, the two test connectors 1 and 2 are initially plugged into the two bus connectors at each end of the bus segment. The following tests can be made by taking measurements between the contacts 3 and 8 and the shield of test connector 2 while operating the changeover switch on test connector 1: • Data cable swapped over • Open circuit of one of the data cables • Open circuit of the cable shield • Short circuit between the data cables • Short circuit between the data cables and the cable shield • Additional bus terminating resistors inserted unintentionally © PNO 1998, Copyright - All Rights Reserved Page 14 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 RS 485 segment B A .. 8 Bus connector Bus connector 3 8 3 screen screen Bus connectors of furher stations Test connector 1 Test connector 2 Ohm- meter Figure 4-1: Schematic diagram of testing the PROFIBUS cable Carrying out the tests Configuration A: Set switch of test connector 1 to position 3 (connects pin 3 to the screen). Connect ohmmeter to test connector 2 between pin 3 and the screen. Configuration B: Set switch of test connector 1 to position 8 (connects pin 8 to the screen). Connect ohmmeter to test connector 2 between pin 8 and the screen. Configuration C: Set switch of test connector 1 to position 3 (connects pin 3 to the screen). Connect ohmmeter to test connector 2 between pin 8 and the screen. Configuration D: Switch position of test connector 1 is not important. Connect ohmmeter to test connector 2 between pin 3 and pin 8. Warning: The measured value can be falsified if the ohmmeter connections are touched. © PNO 1998, Copyright - All Rights Reserved Page 15 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 Test 1 Start Configuration A Measured value *) R=x Ohm R < x Ohm R = infinity Data cable and Short circuit between screen OK data cable and screen Data cable A or screen Cable check open circuit or Configuration C R= infinity - Data cable R = x Ohm A and B or Data cable - screen open circuit A and B swapped over Configuration B R = infinity R = x Ohm R < x Ohm - Data cable B or screen - Screen OK - Possible short circuit open circuit - Data cable B OK between data cable B and - Data cable A screen open circuit x) = 110 Ohm/km. Test 2: Same as test 1 except configuration A and configuration B are exchanged, i.e. start with configuration B. © PNO 1998, Copyright - All Rights Reserved Page 16 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 Test 3: Too many bus terminating resistors inserted Start Configuration D Measured value R = 110 Ohm + x Ohm R < 110 Ohm + x Ohm Everything OK Too many terminators In order to assess the measurements you make, it is necessary to know the loop resistance of the bus cable segment. This is dependent on the cable typse used and the installed cable length. The location of a fault can be determined without opening up the bus connectors by unplugging test connector 1 and plugging it into another bus connector which is closer to test connector 2 while carrying out repeated Ohmmeter measurements at test connector 2. 4.2 Determining the loop resistance PROFIBUS cables of type A have a characteristic loop resistance Rs <=110 Ω/km. This value can differ with special cables and in this case the loop resistance should be determined by measuring a known length of cable. This is done by short circuiting the A and B wires at one end of the reference cable and measuring the resistance between these two wires at the other end. Loop resistance (Rs Ω/km) = measured value (Ω) * 1000 m / length of reference cable (m) Short-circuit the wires Ohm A V Figure 4-2: Determining the cable length © PNO 1998, Copyright - All Rights Reserved Page 17 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 4.3 Testing for correct bus termination The bus connectors should be unplugged from all PROFIBUS devices in the segment. Where this is not possible in exceptional cases (e.g. the bus cables are permanently attached to repeaters), the cables must be removed and temporarily connected together to ensure continuation of the incoming and outgoing data wires and shields. Generally speaking, measurements can be made without opening up the bus connectors, although - depending on the bus connector type - this may still be necessary at the two ends of the segment to allow access to the terminating resistors. A voltage measurement is first made at the one end of the segment between the A and B wires to ensure that no voltage is present. If a voltage can be detected, it is likely that an active device (e.g. repeater or PROFIBUS device) is still connected to the bus segment. All active devices must be unplugged from the bus segment during the following resistance measurements! Provided that no voltage is present on the bus, a resistance measurement should be carried out to check whether additional terminating resistors are unintentionally connected to the segment. During this test, the bus terminating resistors must be removed from both ends of the segment Standard bus termination connects a resistor of 220 Ohms between the A and B wires. If the test measurements shows an open circuit between the A and B wires, the cable segment is correctly installed, other possibilities are as follows: Measured value R ≤ 220 Ω: One or more additional terminating resistors are inserted in the segment or there is a short circuit between the A and B wires All connectors must be checked. Measured value R > 220 Ω to < If the segment length is max. 10000 m, one additional 220Ω 330 Ω: terminating resistor is inserted in the segment. The approximate distance X in m of the terminating resistor from the measurement point can then be calculated with X = 1000 * ( R - 220 ) / Rs. All additional terminating resistors should be removed from the bus segment. 4.4 Determining the segment length and cable route In order to determine the cable length, the bus terminating resistors should be removed or disabled (check for open circuit between the A and B wires). Following this, the bus segment is short circuited at one end and the resistance R between the two data wires is measured at all bus connectors and at all additional connectors. The total cable length can be calculated from the resistance measurements at the far end of the segment. The distance between a particular connector within the segment and the short circuit at the other end of the segment and thus the physical route of the bus cable can be calculated from the resistance measurements at that connector. If bus connectors are fitted with built-in series inductors, it is necessary to subtract the resulting series resistance as specified by the manufacturer for each connector between the measurement point and the short circuit. In addition, half of this value should be subtracted for the connector at the measurement point itself. After making these subtractions, the cable length X can be calculated as follows: X = 1000 * R / Rs. © PNO 1998, Copyright - All Rights Reserved Page 18 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 After finishing the measurements, terminating resistors should be correctly inserted again at both ends of the segment and all bus connectors attached to the corresponding PROFIBUS devices and/or the devices must be re-connected. 4.5 Other test methods The PROFIBUS User Organisation e.V. has set up a working group to investigate measuring methods and common faults. The results of this working group can be accessed in the Internet at http://www.profibus.com under FAQ. The following test methods are usually not required if the PROFIBUS segment has been correctly installed. They are mainly needed for additional investigations if problems are encountered with the bus. Accordingly, these methods will only be described briefly. Note: if bus connectors with an additional Sub-D test tap-off are used, ensure that all 9 pins of the test connection are connected up. This is unfortunately not the case for all types of test connectors. Signal voltage measurements at the ends of the segments: Check the DC voltage feed supplied by the two PROFIBUS devices at each end of the bus using a DC- Voltmeter. Logical data traffic with the bus in operation: This test is carried out with a PROFIBUS scope, which consists of software and a plug-in card for a PC or a PCMCIA card. If possible, the test connection to the bus should use an active tap off. Signal waveform with the bus in operation: This test is carried out with a storage oscilloscope. Faults due to reflection or injected interference, direct measurement: This test is carried out with a PROFIBUS cable tester through which the bus is looped. This requires the bus to be interrupted briefly. Measurements are also possible without interrupting the bus by using a short active tap off. Faults due to interference injection during bus operation, indirect measurement: This test is carried out with an electrical field meter or magnetic field meter (Tesla meter) using sensors on the bus cable. Current flow through the shield of the PROFIBUS cable due to potential equalization currents: This measurement is made with the bus in operation using a clip-on ammeter. If possible you should use an ammeter type which measure TRMS to ensure that non-sinusoidal currents and frequencies higher than 50 Hz are also measured (this is particularly relevant if the bus is installed in the vicinity of a frequency inverter). © PNO 1998, Copyright - All Rights Reserved Page 19 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 5 Equipment report It is recommended to make an equipment report for each bus segment similar to the example below to ensure that documentation is available later in case of faults. Plant section: Example equipment Segment no. 1 Data transfer rate 1500 (in kbit/s): Resistance 230 value (pins 3/8) in Ohms Distance in m Address Cable type Connector type Device Symbolic name 70 GER+ 1 SPS Master controller 1 STD 20 GER 4 200B16DI Inputs FLEX 10 GER+ 6 AG95U Slave controller STD 20 Repeater >>>>to segment no. 5 STD 20 GER 8 TR Position transducer measurement Figure 5-1: Equipment report Legend for Figure 5-1 STD: Standard cable from the "xy" company FLEX: Flexible cable GER+: Connector, top entry, with integrated tap-off for programming device GER: Connector, top entry Rep: Repeater You can use the blank report form on the next page to make your own equipment report. © PNO 1998, Copyright - All Rights Reserved Page 20 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 Plant section: Segment no. Data transfer rate (in kbit/s): Resistance value (pins 3/8) in Ohms Distance in m Address Cable type Connector type Device Symbolic name © PNO 1998, Copyright - All Rights Reserved Page 21 Installation Guideline for PROFIBUS-DP/FMS, Version 1.0, September 1998 6 Test and diagnostics equipment The regularly updated PROFIBUS Product Guide which is available from the PROFIBUS User Organization contains details of available test and diagnostics equipment. 7 Further information The GSD (device master data) files required to set up your PROFIBUS network can be downloaded from the Internet at http://www.profibus.com © PNO 1998, Copyright - All Rights Reserved Page 22  Copyright by: PROFIBUS Nutzerorganisation e.V. Haid-und-Neu-Str. 7 D-76131 Karlsruhe Phone: ++ 721 / 96 58 590 Fax: ++ 721 / 96 58 589 e-mail: [email protected] http://www.profibus.com Nr 10 / 02.05.2017 N.R. Energy OÜ Järve küla, Kohtla vald, Ida-Viru maakond Tapa katlamaja projekti autorijärelevalve ülevaatuse akt (teostusdokumentatsioon ja objekti ülevaatus) Kokkuvõte Ehitaja poolt Tellijale tutvumiseks antud Tapa katlamaja (Üleviste 5, 45107 Tapa linn) teostusdokumentatsiooni Autorijärelevalve poolsel ülevaatusel ilmnenud puudustest ja küsitavustest: 1. Arvestades antud elektripaigaldise eripära, tuleb kindlasti teostada ka elektromagnetilise (EMC) ühilduvuse lisakontroll, mida praegu millegipärast tehtud ei ole. Kas nõutav EMC ühilduvus on üldse tagatud? (oluline puudus) 2. Kindlasti tuleb teostada andmesidesüsteemi, sh. avatud üldkaabeldussüsteemi kontrollmõõtmised, vastavalt Eesti standardile EVS-EN 50346:2003+ A1:2007+A2:2009 „Infotehnoloogia – Paigaldatud juhistiku testimine“. Neid olulisi mõõtmisi praegu tehtud ei ole, seega pole selgust, kas nõrkvoolupaigaldis üldse vastab kehtivatele nõuetele. (oluline puudus) 3. ATS-i dokumentatsioon puudulik. Puudub Töövõtja poolt esitatav vastavusdeklaratsioon (sertifikaat) kogu süsteemile, kontrollmõõtmiste protokollid, sh aku tööaeg, süsteemi päevik ja hoolduspäevik. Lähtuda Eesti standardisarjast EVS-EN 54 „Automaatne tulekahjusignalisatsioon“. Lisada. Praegu on seega üleval palju küsimusi, sh. kas süsteem talitleb ikka nõuetekohaselt, kas valitud akude mahtuvus on ikka piisav, jne. (oluline puudus) 4. Ei ole esitatud suitsueemaldussüsteemi nõutavaid dokumente (vastavusdeklaratsioon (sertifikaat) kogu süsteemile, kontrollmõõtmiste protokollid, sh aku tööaeg, süsteemi päevik ja hoolduspäevik), lähtudes Eesti standardist EVS 919:2013 + A1:2014 „Suitsutõrje. Projekteerimine, seadmete paigaldus ja korrashoid“ ning Eesti standardisarjast EVS-EN 12101 „Suitsu ja kuumuse kontrollsüsteemid“. Lisada nõuetekohased dokumendid. Praegu on kahtlus, kas see süsteem ikka nõuetekohaselt talitleb. (oluline puudus) 5. Ei ole esitatud nõuetekohaseid videovalvesüsteemi nõutavaid dokumente (vastavusdeklaratsioon (sertifikaat) kogu süsteemile, kontrollmõõtmiste protokollid, sh andmesidekaablid, süsteemi päevik ja hoolduspäevik), lähtudes Eesti standardisarjast EVS-EN 62676 „Videovalvesüsteemid“. Lisada dokumendid. (ei takista otseselt katlamaja tööd) 6. Ka valvesignalisatsiooni ja läbipääsusüsteemi nõuetekohane teostusdokumentatsioon puudub. Lisada vähemalt vastavusdeklaratsioon (sertifikaat) EMP A&I OÜ Tel/phone +372 660 4676 SEB Pank Lõõtsa 8A C SWIFT/BIC: EEUHEE2X 11415 Tallinn e-mail: [email protected] IBAN: EE051010052028095006 Eesti /Estonia www.empai.ee Reg. nr 10111746 kogu süsteemile, kontrollmõõtmiste protokollid, sh aku tööaeg, süsteemi päevik ja hoolduspäevik, lähtudes Eesti standardisarjast EVS-EN 50131 „Valvesüsteemid“ ja Eesti standardisarjast EVS-EN 60893-11 „Läbipääsusüsteemid“. (ei takista otseselt katlamaja tööd) 7. Ei leidnud ka nõuetekohaseid dokumente UPS-i testimise kohta, samuti kogu katkematu toite süsteemi, kui terviku talitlusnõuete tagamise kohta. Lisada, lähtudes kehtivatest nõuetest, sh. Eesti standardisari EVS-EN 62040 „Katkematu toite süsteemid“. (oluline puudus) 8. Alltöövõtjate nimekirjast puudub firma AGR OÜ, kes ehitustööde päeviku järgi paigaldas 12-13.12.2016. a. veemõõdusõlme. (ei takista otseselt katlamaja tööd) 9. Ehitustööde päeviku leht nr. 187 10.02.2017. a. ei kajasta mitte ühegi märkega seda, et Inspecta viis sellel päeval läbi elektripaigaldise auditit. Seda fakti ei ole ei päeviku tegevuste hulgas ega objektil viibinud alltöövõtjate hulgas. Täpselt sama asi on lehega nr. 172 23.01.2017. a., kui Inspecta aruande järgi tehti katse- ja mõõdistustöid objektil. Jällegi ei ole ühtegi märget ei mõõtetööde ega Inspecta kohalviibimise kohta. (ei takista otseselt katlamaja tööd) 10. On olemas Inspecta poolt tehtud elektripaigalduse kasutuselevõtu audit 10.02.2017. a., mis käsitleb elektripaigaldist kuid ei käsitle piksekaitset, nõrkvoolu ja automaatikat. On olemas ka Elektrikontroll OÜ poolt 12.04.2017. a. tehtud aruanne maanduse kontrollimise kohta. Kuid kumbki neist mõõdistustest ei käsitle piksekaitset ega nõrkvoolu kaabelduse paigaldust ja just selles osas ongi ka projekteerijal suured pretensioonid. Samuti ei käsitle kumbki audit/aruanne tegeliku paigalduse vastavust esialgsele projektile sest võrreldud on paigalduse vastavust teostusjoonisele. See aga ei lähe kokku EMP A&I OÜ poolt koostatud projekti joonistega. (oluline puudus) 11. OÜ Entronik teostusjoonistel puudub igasugune viide reklaamvalgustuse toiteahela väljaehitamise kohta. Seega jooniste järgi seda ühendust ei ole olemas kuigi Ehitaja väitel on õhenduskarbid kaabliredelitel mingites kohtades olemas. (ei takista otseselt katlamaja tööd) 12. Kaetud tööde akt nr. 097 ütleb, et aiapostid betoneeriti alltöövõtja Fagel Automaatika OÜ poolt 500-600 mm sügavustesse ja 250-300 mm läbimõõduga aukudesse. Alusdokumentidena on kasutatud meie projekti joonist AS-3B, mis käsitleb postide asukohti (asendiplaan) kuid postide paigaldussügavus on kirjeldatud TP AR osa seletuskirjas p.2.7.4, mis sätestab: „Posti vundament: h=1,0 m, Ø 0,3 m; 0,071 m³ betoonist - C30/37 XF1“. Seega ilmselgelt ei vasta aiapostide paigaldus projekti nõuetele ning postid logisevad kuna vundament on ettenähtust poole väiksem. (ei takista otseselt katlamaja tööd) 13. Ei ole aru saada kuhu on ühendatud õlipüüduri ja liivapüüduri tasemeandurid. Projekti järgi pidid vastvad kaablid viidama peajaotuskeskusesse. (ei takista otseselt katlamaja tööd) 14. Ehitustööde päeviku alusel on väga raske hinnata (kohati ka võimatu) kasutatud materjalide koguseid (v.a. asfalt ja betoon). See omakorda teeb võimatuks hinnata teatud tööde tegeliku teostamise aega. (ei takista otseselt katlamaja tööd) NB! Käesolevaga esitatud dokumentatsiooni puuduste ja küsitavuste loend ei pruugi olla lõplik. Võivad lisanduda uued või täiendavad märkused, vastavalt Ehitaja poolt täiendava teostusdokumentatsiooni esitamisele. Kokkuvõte 28.04.2017. a. toimunud Autorijärelevalve poolsel Objekti ülevaatusel tehtud mittevastavustest: Uus katlamaja: 1. Uue katlamaja katus laseb vett läbi ja seda nii katlamaja kui hakkepuidu lao osas. Hakkepuidu laos on näha veelombid nt. teljel 9 ja 11. Samuti on näha katuseplekis kruviaugud, mis on tekkinud ilmselt katusepleki ebakorrektse paigaldamise käigus. Katlamaja osas on läbijooksud teljel 7, operaatoriruumis ja katlaruumis. (oluline puudus) 2. Katlaruumi põranda toon on ebaühtlane ning jätab laigulise mulje (nt. hüdrosilindrite ruumi ees ja katlaruumis). Boileri juures on põrandas praod ning katla eest ebakorrektne valujääk. (ei takista otseselt katlamaja tööd) 3. Ehitaja ja Tellija vahelise kokkuleppe järgi pidi Ehitaja katma SW paneelide kahjustatud kohad kleebistega, mida aga ei ole tehtud. (ei takista otseselt katlamaja tööd) 4. Katlamaja valgustus ei ole projektikohane, s.t. nii valgustite tüüp kui paigutus ei vasta EMP A&I OÜ poolt koostatud projektile (katlaruum, WC, duširuum). (ei takista otseselt katlamaja tööd) 5. Osad pistikupesad ja lülitid on praegu nõuetekohaselt markeerimata (nt. operaatoriruumi valgustuse lüliti). (ei takista otseselt katlamaja tööd) 6. Osad häda-/turvavalgustid ei tööta või ei talitlevad mittenõuetekohaselt. (oluline puudus) 7. Ventilatsioonirestides asuva filtri vahetuse võimalus on Ehitaja poolt realiseeritud nii, et kui filtrit vahetada juba mitmendat korda, siis saab paratamatult kahjustada paigaldusliistude viimistluskiht. Projektijärgse tsingitud võrgu asemel kasutatud võrk aga juba roostetab (restpind RP-1.1). (ei takista otseselt katlamaja tööd) 8. Ruumi 07 (pesemisruum) ripplae pealmine osa on tehtud nii, niiskus võib pääseda ülemistesse konstruktsioonidesse. (ei takista otseselt katlamaja tööd) 9. Operaatoriruumi akna väline katteplekk on kinnitatud ebakorrektselt. (ei takista otseselt katlamaja tööd) 10. Torude läbiviigud välisseintest (s.h. korstnatoru) on korrektselt tihendamata. (oluline puudus) 11. Katlamaja telgede D/1-2 vahel on sisesoklis pragu. (oluline puudus) 12. Tapa katlamaja arhitektuurne lahendus näeb ette suurel hulgal puhta betoonpinna eksponeerimist. Vaadates teljel 7 olevat seina hakkepuidu lao poolt on aga ilmne, et see ei vasta oma väljanägemiselt projektis esitatud nõuetele sest raketise tõmbiaugud on täidetud seina üldilmet tugevalt rikkuvalt. Palun ehitajal viimistleda tõmbiaugud nii, et täidis harmoneeruks seinaga, mitte ei oleks sellega tugevas kontrastis. (ei takista otseselt katlamaja tööd) 13. Hoone välisperimeetril olev valgusvöö kate lainetab. (ei takista otseselt katlamaja tööd) 14. Teljel E olev betoonpandus on ehituse käigus määrdunud roostega ning see on vaja kindlasti puhastada. (ei takista otseselt katlamaja tööd) 15. Hoone piksekaitse allaviigud on mitmes kohas teostatud ebakorrektselt. Arvestades hoone väljanägemise olulisust oleks Ehitaja pidanud esteetilistel kaalutlustel fassaadidel kasutama ET osa seletuskirjas p.3.14 „Piksekaitsesüsteem“ äramärgitud varjatud allaviike (isolatsiooniga piksekaitsejuht). (ei takista otseselt katlamaja tööd) 16. Tuhakonteineri ruumi avatud seina osa kohal oleva katuse servaplekk on paigaldatud valesti, s.t. vesi jookseb kattepleki vahele. (oluline puudus) 17. Maanduse läbiviigud katlaruumi põrandast tuleb kõik tihendada elastse mastiksiga. (ei takista otseselt katlamaja tööd) 18. Katlamaja territooriumi jalgvärav on paigaldatud nii, et seda saab avada ka ilma kaardita/võtmeta surudes nt. kruvikeeraja lukukeele ja väravaposti vahele. See ei ole vastuvõetav. (oluline puudus) 19. Parapet teljel 1 on kõver. Parapetiplekk teljel 7 lainetab. (ei takista otseselt katlamaja tööd) 20. Tuhakonveieri läbiviik välisseinast on veekindlalt sulgemata. (oluline puudus) 21. Puudub info kuhu on ühendatud õlipüüduri ja liivapüüduri tasemeandurid. Projekti järgi pidid vastvad kaablid viidama peajaotuskeskusesse. (ei takista otseselt katlamaja tööd) Olemasolev katlamaja: 1. Olemasoleva katlamaja katus laseb läbi, nt. korstna juurest, aga ka mujal. (oluline puudus) 2. Katuse SBS-katte ülespöörded ja ülekatted on kohati nii väikesed, et see ei taga konstruktsioonide kaitset sademete eest. Kohati on aga ülespöörded teostatud ebakorrektselt. Torude galerii üleminekul parapetist on aga OSB-plaat üldse katmata, samuti on katmata osa näha hoone tagaküljel. (oluline puudus) 3. Parapetipleki kinnitused on kohati ebapiisavad/ebakorrektsed. (ei takista otseselt katlamaja tööd) 4. Osad häda-/turvavalgustid ei tööta või ei talitlevad mittenõuetekohaselt. (oluline puudus) 5. Küttetorude galerii kattepleki servad roostetavad kuigi plekk on olnud katusel vaid mõni kuu. Samuti on näha roostet küttegalerii karkassil. (ei takista otseselt katlamaja tööd) 6. Palun ehitaja kinnitust, et olemasoleva katlamaja tõstuksed vastavad plahvatuspinna nõuetele (vt. AR osa seletuskiri p.5.2.2 ja joonis AR-13). (oluline puudus) 7. Luksepa töökoja keevituslaua kohal olev ventilatsioon on väga tugeva müraga. Ventilatsiooni osa seletuskirjas on öeldud, et müratase ruumis ei tohiks ületada 40 dB, kuid praegu on see oluliselt suurem. (ei takista otseselt katlamaja tööd) Üldised märkused ja tähelepanekud: 1. Aiapostide vundamendid ei ole projektikohased. Seetõttu postid loksuvad. (ei takista otseselt katlamaja tööd) Kokkuvõttekss võib öelda, et autorijärelevalve raames tehtud dokumentatsiooni ja objekti ülevaatuse käigus tuvastati palju olulisi puudusi, mis projekteerija hinnangul takistavad katlamaja kasutuselevõtmist. Lisaks tuvastati ka terve rida puudusi, mida võib pidada küll katlamaja tööd otseselt mittetakistavaks kuid mis on ilmselged mittevastavuses projektis sätestatuga, hoone kontseptsiooniga ja/või hea ehitustavaga ning mis seetõttu peavad kuuluma kõrvaldamisele ehitaja poolt enne hoone lõpliku kasutuselevõtmist. Kindlasti soovitame Tellijal teha või lasta teha teostusdokumentatsiooni korralik läbivaatus sest on alust arvata, et meie ülevaatus ei katnud kõiki spetsiifilisi detaile. Lugupidamisega, Tarvo Trei Juhatuse esimees tel. 660 4676; 50 68 248 e-mail: [email protected] Hr Kaupo Kaasik [email protected] Hr Kristjan Õim [email protected] Hr Andrus Freienthal [email protected] [email protected] Hr Mati Kanarik [email protected] Hr Alari Kirt [email protected] Hr Aare Palmsalu [email protected] Meie 15.05.2017 nr NRE170515233 INFORMATSIOON Tapa linna kaugküttepiirkonna soojusmajanduse teemalise koosoleku põhiselt. 18. aprillil 2017 toimunud kolmepoolse nõupidamise infovahetuse põhimõtetest lähtuvalt, annab soojatootja N. R. Energy OÜ alljärgnevalt Tapa katlamaja ehitusprotsessi lõpetamise progressi ülevaate. N. R. Energy OÜ on tellinud ehitise ja ehituse täitedokumentatsiooni puuduste fikseerimiseks ekspertiisi riiklikult tunnustatud ehituseksperdilt hr Ülo Lainsalu’lt (Ehitusekspert OÜ), kes teostas juba esmase objekti ja dokumentatsiooni ülevaatuse 05.05.2017. Ühtlasi N. R. Energy OÜ esitas ehitajale AS TREV-2 Grupp taaskord omaniku järelevalve, projekti autorijärelevalve ja käidukorraldaja andmete põhjal puuduste nimekirja ning andis ehitajale seadusest tulenevalt viimase võimaluse puuduste likvideerimiseks (tähtaeg 25.05.2017). Riiklikult tunnustatud ehituseksperdi ekspertiisi akt loob alused ehitaja initsieeritud tõendamata ebakonstruktiivsete vaidluste lõpetamiseks ning võimaldab N. R. Energy OÜ’l peale ehitajale antud viimase tähtaja möödumist, kaasata täiendavaid alltöövõtjaid nende puuduste likvideerimiseks, mis jäävad AS TREV-2 Grupp poolt kõrvaldamata. Alltöövõtjate valiku protsess on juba alanud. N.R. Energy OÜ Registrikood 12364776 SWEDBANK AS e-post: [email protected] RTVL003576 KMKR EE101802288 Liivalaia 8, 15040 Tallinn tel. +(372) 336 7777 KST000023 Järve küla, Kohtla vald SWIFT/BIC: HABAEE2X fax. +(372) 337 4057 KSM000019 30331 Ida-Virumaa IBAN: EE122200221024916807 KSJ000014 EESTI Kokkuvõtvalt võimaldab välja töötatud lahendus ehitajaga seonduvatest vaidlustest eraldiseisvalt viia katlamaja soojatootmiseks vajalikku valmidusse ning N. R. Energy OÜ on valmis Riigi Kaitseinvesteeringute Keskuse soovil, Tapa sõjaväelinnakut soojusenergiaga varustama juba suvel 2017. Peale puuduste likvideerimist on N. R. Energy OÜ’l hea meel kutsuda Tapa Vallavalitsuse ja Riigi Kaitseinvesteeringute Keskuse esindajaid vastava huvi korral, Euroopa kõige kaasaegsemate lahendustega hakkepuidul töötava katlamaja esitlusele, asukohaga Üleviste tn 5. Lugupidamisega Richard Viies Juhatuse liige N.R. Energy OÜ Registrikood 12364776 SWEDBANK AS e-post: [email protected] RTVL003576 KMKR EE101802288 Liivalaia 8, 15040 Tallinn tel. +(372) 336 7777 KST000023 Järve küla, Kohtla vald SWIFT/BIC: HABAEE2X fax. +(372) 337 4057 KSM000019 30331 Ida-Virumaa IBAN: EE122200221024916807 KSJ000014 EESTI Hr Andrus Freienthal Tapa Vallavalitsus e-post: [email protected] Teie 09.05.2017 Meie 16.05.2017 nr NRE170516238 TEAVITUS Ülesõidu 6 kaugküttetorustiku leke 03.05.2017 hommikul juhtus Tapa linnas kaugküttetorustiku avarii. Torustiku põhjapoolse osa väljalülitamise metoodika abil asuti operatiivselt lokaliseerima lekke asukohta. Kasutatud metoodika võimaldas samal päeval tuvastada lekke asukohas Ülesõidu tn 6 (vt fotod NRE170516236 Lisa 1) ning enamus lekke lokaliseerimiseks välja lülitatud hooneid oli seejärel võimalik uuesti kütmiseks ühendada. Kütteta jäid küttetrassi avariiga otseselt seotud Ülesõidu 6 ja ka läbi selle hoone kaugküttega ühendatud Ülesõidu 6A. Lekke kõrvaldamise käigus asendati läbi korrodeerunud isolatsioonita torud uute eelisoleeritud torudega. Kuivõrd terve trassi lõigu asendamist ei saa pidada tavapäraseks avarii likvideerimistööks, tingis materjalide ja teenuste hanke vajadus lahenduse saavutamiseks pikema ajanormi, mille tõttu Ülesõidu 6 soojaga varustamine muutus võimalikuks 10.05.2017. Kaevetööd lõpetatakse 16.05.2017. Avariiline torustik on Tapa Vesi OÜ omand, mida N. R. Energy OÜ rendib, samas N. R. Energy OÜ’l torustiku kohta dokumentatsioon puudub. Dokumentatsioon on tekkinud olukorras oluline ka seetõttu, et avarii likvideerimiseks trassi avamisel selgus, et purunenud trass ei olnud riigis kehtivate normide kohane. Täpsemalt torustiku lahti kaevamisel, tulid nähtavale isolatsioonita torud, millega oli teostatud hoone ühendus kaugküttetorustiku ja hoone sisendi vahel ning mille ehituse aeg langeb samasse perioodi Tapal SA KIK toetusega rajatud kaugküttetorustiku ehitusega. Eelnev annab aluse küsimusele, kas torustiku kasutamise eest tavapäraste hindadega võrreldes küllaltki kõrge rent, mida soosis ka Konkurentsiamet, on siiski arvutatud korrektselt, eriti kui käesolevaga on leidnud tõendamist asjaolud, et torustik ei ole renoveeritud täies ulatuses või renoveeritud soojatorustik on ehitatud kehtivaid nõudeid ja õigusakte eirates? Sündmuste sisu arvestades on tõenäoline sarnaste normidele mittevastavate lahenduste kasutus ka teiste hoonete ühendamisel, seega ei saa välistada sarnaseid uusi lekkeid. Samuti selgitab selliste isoleerimata torustikulõikude olemasolu, miks ei mahu soojuse kaod torustiku arvutusliku näitaja piiridesse, vaid veelgi enam – ületavad ka õigusaktidega lubatud näitajat 15%. Teadaolevalt Konkurentsiamet lähtub piirhindade kooskõlastamisel otseselt 15% piirmäärast ja kõik seda piirmäära ületavad trassikaod, mille suurust antud olukorras N.R. Energy OÜ võimalust mõjutada ei ole, kaetakse soojatootja rahavoogude arvelt. Ülesõidu 6 lekke kõrvaldamisega seonduvat ei saa hinnata torustike rendi tavapäraseks hoolsuskohustuseks, vaid tegemist on siiski eraldi investeeringuga, arvestatavate ehitusaegsete puuduste likvideerimisel. Võimalikest alternatiividest investeeringu õiglaseks kajastamiseks, tuleks kaaluda kas 1) N.R. Energy OÜ’le väljastada asendatud trassilõigu osas kasutusluba või 2) N.R. Energy OÜ Registrikood 12364776 SWEDBANK AS e-post: [email protected] RTVL003576 KMKR EE101802288 Liivalaia 8, 15040 Tallinn Tel +(372) 336 7777 KST000023 Järve küla, Kohtla vald SWIFT/BIC: HABAEE2X Faks +(372) 337 4057 KSM000019 30331 Ida-Virumaa IBAN: EE122200221024916807 KSJ000014 EESTI kompenseerida N.R. Energy OÜ’le tehtud investeering. Täpne küttetrassi asendamise kulu on võimalik arvutada peale kõigi materjalide ja teenuste kuluarvete N.R. Energy OÜ’ni jõudmist. Lugupidamisega Richard Viies Juhatuse liige N.R. Energy OÜ Registrikood 12364776 SWEDBANK AS e-post: [email protected] RTVL003576 KMKR EE101802288 Liivalaia 8, 15040 Tallinn Tel +(372) 336 7777 KST000023 Järve küla, Kohtla vald SWIFT/BIC: HABAEE2X Faks +(372) 337 4057 KSM000019 30331 Ida-Virumaa IBAN: EE122200221024916807 KSJ000014 EESTI NRE170516236 Lisa1 NRE170516236 Lisa1 Hr Alari Kirt Tapa Vallavalitsus Hr Kaupo Kaasik Meie 24.03.2017 nr 151 Riigi Kaitseinvesteeringute Keskus Torustiku läbipesu ja täitmine Anname teada, et meil on alates esmaspäevast, 27.03.2017 viimane võimalus tasuta testida katla tootja Agro kaasabil kõikide katelde kaskaadlülitust. Kuna esialgse info põhjal soovib kaitsevägi käesoleva aasta mais-juunis sooja ehitatavate hoonete kuivatamiseks, on vajalik täita veega ning pesta läbi kaitseväeni viiv kaugküttetorustik (veelgi parem oleks sama teha ka kaitseväe linnaku territooriumil paikneva kaugküttetorustikuga). Selleks palun kutsuge välja AS Magma esindajad, et vaadata üle kõik sulgeseadmed kaitseväe objektideni. Sõltuvalt kaitseväe linnaku territooriumil paikneva kaugküttetorustiku läbipesuks valmisolekust lülitame töösse kas bypass-sõlme või täidame kogu süsteemi. Torustiku täitmiseks kulub 3-5 ööpäeva. Süsteemi täidame spetsiaalselt ettevalmistatud veega, kuigi jätame lisamata kemikaali. Täidetavast veest võetava analüüsi saadame laborisse, et määrata kindlaks vajalik lisatava kemikaali kogus. Peale seda me üks kord eemaldame selle reostunud vee, et täita torustik uuesti puhta ettevalmistatud soojuskandjaga. Palun teatada lähim võimalik tähtaeg ülaltoodud tööde läbiviimiseks, kas e-posti aadressil [email protected], või minu telefonil +372 5199 1916. Lugupidamisega /allkirjastatud digitaalselt/ Ahto Tisler Juhatuse liige N.R. Energy OÜ Registrikood 12364776 AS Citadele Banka Eesti Filiaal e-post: [email protected] KMKR EE101802288 Roosikrantsi 2, 10119 Tallinn tel +372 336 7777 Järve küla, Kohtla vald SWIFT/BIC: PARXEE22 faks +372 337 4057 30331 Ida-Virumaa IBAN: EE411200001260570081 EESTI Peeter Lauring Tel 5664 8310 e-post: [email protected] Meie 26.07.2017 nr 327 Tapa kütteprobleemide lahendamine Lugupeetud Peeter Lauring Käesoleva aasta veebruaris pöördusite Tapa linna korteriühistute nimel N.R. Energy Osaühingu (edaspidi NRE) poole tehnilise küsimusega seoses küttevees ilmnenud kütteõliga. Vastava informatsioonisaamise järgselt oli NRE hoolsa ettevõtjana probleemi sisu selgumise järgselt koheselt valmis kütteperioodi lõppedes küttesüsteeme puhastama (vt ka meie 09.03.2017 kiri nr 130). Pakkusime kütteperioodi järgseks kohtumiseks võimaliku variandina 20. juuli 2017 kell 10.00 N.R. Energy OÜ kontoris, aadressil Pikk tn 12, Tapa linn (sissepääs hoovi poolt), et koostöös korteriühistute esindajatega läbi arutada konkreetsed võimalikud kitsaskohad, mille alusel oleks võimalik eelneva kütteperioodi põhjal teha parendustegevusi tulevikulahenduste nimel ja leppida kokku täpne tegevuskava. Klientide tagasiside abil saab NRE asuda läbi vaatama soojussõlmesid ja vajadusel puhastama küttesüsteeme. Palusime Teil kinnitada või tagasi lükata NRE poolt pakutud kohtumise aeg või pakkuda välja omapoolne uus aeg (oleme juba teadlikud, et kirjas esines inimlik viga – loomulikult ei saanud tagasiside andmise aeg 10.07.2017 olla varasem kui kirja kirjutamise aeg, tegelikult oli mõeldud 19.07.2017). Kuna koosoleku kutse saanute poolt igasugune tagasiside puudus, siis mõistsime üheselt, et NRE poolt pakutud koht ja aeg on kohtumiseks sobiv (s.h ka Tapa Vallavalitsusele, kuhu samuti oli saadetud sama teatis ning kus ollakse avaliku teenistuse seaduse põhjal kohustatud kõikidele pöördumistele vastama). Mõneti esialgu üllatavalt, olid kohtumiseks kokkulepitud ajal kohal vaid N.R. Energy OÜ-d esindavad ettevõtte omanik Nikolai Reisman, juhatuse liige Ahto Tisler, vanemoperaator Sven Vallimäe. Positiivne suuline tagasiside kui ka soojatarbijate esindajate võimalikke kitsaskohti käsitlevale koosolekule mitteilmumine, tõendab NRE valitud kliendi heaolust lähtuvate parenduslike tegevuskavade tõhusust ning tõlgendatav selge märgina, et N.R. Energy OÜ ja korteriühistute senise koostöö tulemusena on probleemid lahendatud ning kaotanud oma aktuaalsuse edaspidiseks. Koostööd ja rahulolu kinnitab ka 20.07.2017 ja hilisemate otsesuhtluste käigus korteriühistutelt saadud suuline tagasiside – käesolevaks ajaks on küsimused lahendatud. Sellegipoolest N.R. Energy OÜ kliente väärtustava ning vastutustundliku ettevõttena kinnitab, et klientide heaolu nimel oleme meie klientide juures võimalike kaugküttega seonduvate väljakutsete tekkimisel alati huvitatud kliente abistama nii nõu kui ka jõuga. Lugupidamisega /allkirjastatud digitaalselt/ Ahto Tisler Juhatuse liige N.R. Energy OÜ Registrikood 12364776 SWEDBANK AS e-post: [email protected] RTVL003576 KMKR EE101802288 Liivalaia 8, 15040 Tallinn Tel +(372) 336 7777 KST000023 Järve küla, Kohtla vald SWIFT/BIC: HABAEE2X Faks +(372) 337 4057 KSM000019 30331 Ida-Virumaa IBAN: EE122200221024916807 KSJ000014 EESTI
Allikas: Riigi Kaitseinvesteeringute Keskus dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel