Sotsiaalministeerium · 8. oktoober 2020
Sisu (failidest)
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
EUROPEAN COMMISSION
Consumers, Health, Agriculture and Food Executive Agency
(CHAFEA)
The Director
GRANT AGREEMENT
NUMBER 951202 — Best-ReMaP
This Agreement (‘the Agreement’) is between the following parties:
on the one part,
the Consumers, Health, Agriculture and Food Executive Agency (CHAFEA) ('the Agency'), under
the powers delegated by the European Commission ('the Commission'), represented for the purposes
of signature of this Agreement by Véronique WASBAUER, Director, or his/her duly authorised
representative,
and
on the other part,
1. ‘the coordinator’:
NACIONALNI INSTITUT ZA JAVNO ZDRAVJE (NIJZ), established in TRUBARJEVA CESTA
2, LJUBLJANA 1000, Slovenia, VAT number: SI44724535, represented for the purposes of signing
the Agreement by Director, Milan Krek
and the following other beneficiaries, if they sign their ‘Accession Form’ (see Annex 3 and Article 40):
2. BUNDESMINISTERIUM FUER ARBEIT, SOZIALES, GESUNDHEIT UND
KONSUMENTENSCHUTZ (BMASGK), established in Radetzkystrasse 2, WIEN 1030, Austria,
3. SCIENSANO (SCIENSANO), established in JULIETTE WYTSMANSTRAAT 14, ELSENE
1050, Belgium, VAT number: BE0693876830,
4. MINISTRY OF CIVIL AFFAIRS (MCA), established in Trg Bosne i Hercegovine 1,
SARAJEVO 71000, Bosnia and Herzegovina,
5. NATSIONALEN CENTAR PO OBSHTESTVENO ZDRAVE I ANALIZI (NCPHA),
established in ACAD IVAN GESHOV BLVD 15, SOFIA 1431, Bulgaria, VAT number:
BG176094665,
6. HRVATSKI ZAVOD ZA JAVNO ZDRAVSTVO (CIPH), established in ROCKEFELLEROVA
7, ZAGREB 10000, Croatia, VAT number: HR75297532041,
7. Ministry of Health of the Republic of Cyprus (MoH CY), established in 1 Prodromou Street &
17 Chilonos Street 1 & 17, Nicosia 1448, Cyprus,
1
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
8. FODEVARESTYRELSEN (DVFA), established in STATIONSPARKEN 31, GLOSTRUP 2600,
Denmark, VAT number: DK62534516,
9. SOTSIAALMINISTEERIUM (MoSA), established in Suur-Ameerika 1, TALLINN 10122,
Estonia,
10. TERVEYDEN JA HYVINVOINNIN LAITOS (THL), established in MANNERHEIMINTIE
166, HELSINKI 00271, Finland, VAT number: FI22295006,
11. AGENCE NATIONALE DE LA SECURITE SANITAIRE DE L ALIMENTATION DE L
ENVIRONNEMENT ET DU TRAVAIL (ANSES), established in 14 RUE PIERRE ET MARIE
CURIE, MAISONS ALFORT 94700, France, VAT number: FR54130012024,
12. MAX RUBNER INSTITUT BUNDESFORSCHUNGSINSTITUT FUR ERNAEHRUNG
UND LEBENSMITTEL (MRI), established in HAID UND NEU STRASSE 9, KARLSRUHE
76131, Germany, VAT number: DE811393840,
13. INSTITOUTON YGEIAS TOU PAIDIOU (ICH), established in THIVON KAI LIVADIAS,
ATHINA 11527, Greece, VAT number: EL090073098,
14. SEMMELWEIS EGYETEM (SU), established in ULLOI UTCA 26, BUDAPEST 1085,
Hungary, VAT number: HU15329808,
15. DEPARTMENT OF HEALTH (DoH), established in Block 1, Miesian Plaza, 50 – 58 Lower
Baggot Street, Dublin D02 XW14, Ireland,
16. ISTITUTO SUPERIORE DI SANITA (ISS), established in Viale Regina Elena 299, ROMA
00161, Italy, VAT number: IT03657731000,
17. SLIMIBU PROFILAKSES UN KONTROLES CENTRS (CDPC), established in Duntes 22,
Riga LV1005, Latvia, VAT number: 90009756700,
18. LIETUVOS RESPUBLIKOS SVEIKATOS APSAUGOS MINISTERIJA (LR SAM),
established in VILNIAUS G 33, VILNIUS LT 01506, Lithuania,
19. Ministry for Health - Government of Malta (MFH), established in Palazzo Castellania,
Merchants Street 15, Valletta VLT 200, Malta, VAT number: MT12979127,
20. RIJKSINSTITUUT VOOR VOLKSGEZONDHEID EN MILIEU (RIVM), established
in Antonie Van Leeuwenhoeklaan 9, BILTHOVEN 3721 MA, Netherlands, VAT number:
NL821772302B01,
21. SLASKI UNIWERSYTET MEDYCZNY W KATOWICACH (SUM), established in UL.
PONIATOWSKIEGO 15, KATOWICE 40 055, Poland, VAT number: PL6340005301,
22. MINISTERIO DA SAUDE - REPUBLICA PORTUGUESA (DGS), established in Av. João
Crisóstomo, 9, LISBOA 1049-062, Portugal,
23. INSTITUTUL NATIONAL DE SANATATE PUBLICA (NIPH), established in STR DR
LEONTE 1-3 SECTOR 5, BUCURESTI 050463, Romania,
24. INSTITUT ZA ZASTITU ZDRAVLJA SRBIJEDR MILAN JOVANOVIC BATUT (IPHS),
established in DR SUBOTICA STREET 5, BEOGRAD 11000, Serbia, VAT number: RS102000930,
2
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
Unless otherwise specified, references to ‘beneficiary’ or ‘beneficiaries’ include the coordinator.
The parties referred to above have agreed to enter into the Agreement under the terms and conditions
below.
By signing the Agreement or the Accession Form, the beneficiaries accept the grant and agree to
implement it under their own responsibility and in accordance with the Agreement, with all the
obligations and conditions it sets out.
The Agreement is composed of:
Terms and Conditions
Annex 1 Description of the action
Annex 2 Estimated budget for the action
Annex 2a Not applicable
Annex 3 Accession Forms
Annex 4 Model for the financial statements
Annex 5 Model for the certificate on the financial statements (CFS)
3
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
TERMS AND CONDITIONS
TABLE OF CONTENTS
CHAPTER 1 GENERAL................................................................................................................................................9
ARTICLE 1 — SUBJECT OF THE AGREEMENT.........................................................................................9
CHAPTER 2 ACTION................................................................................................................................................... 9
ARTICLE 2 — ACTION TO BE IMPLEMENTED.........................................................................................9
ARTICLE 3 — DURATION AND STARTING DATE OF THE ACTION......................................................9
ARTICLE 4 — ESTIMATED BUDGET AND BUDGET TRANSFERS........................................................ 9
4.1 Estimated budget.................................................................................................................................. 9
4.2 Budget transfers....................................................................................................................................9
CHAPTER 3 GRANT.....................................................................................................................................................9
ARTICLE 5 — GRANT AMOUNT, FORM OF GRANT, REIMBURSEMENT RATE AND FORMS OF
COSTS..............................................................................................................................................9
5.1 Maximum grant amount....................................................................................................................... 9
5.2 Form of grant, reimbursement rate and forms of costs....................................................................... 9
5.3 Final grant amount — Calculation.....................................................................................................10
5.4 Revised final grant amount — Calculation....................................................................................... 11
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS................................................................................12
6.1 General conditions for costs to be eligible........................................................................................ 12
6.2 Specific conditions for costs to be eligible........................................................................................12
6.3 Conditions for costs of affiliated entities to be eligible.....................................................................15
6.4 Ineligible costs....................................................................................................................................15
6.5 Consequences of declaration of ineligible costs................................................................................ 16
CHAPTER 4 RIGHTS AND OBLIGATIONS OF THE PARTIES........................................................................ 16
SECTION 1 RIGHTS AND OBLIGATIONS RELATED TO IMPLEMENTING THE ACTION................ 16
ARTICLE 7 — GENERAL OBLIGATION TO PROPERLY IMPLEMENT THE ACTION.........................16
7.1 General obligation to properly implement the action........................................................................ 16
7.2 Consequences of non-compliance...................................................................................................... 16
ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD PARTIES INVOLVED IN THE
ACTION.........................................................................................................................................17
ARTICLE 8a — IMPLEMENTATION OF ACTION TASKS BY BENEFICIARIES NOT RECEIVING EU
FUNDING...................................................................................................................................... 17
ARTICLE 9 — PURCHASE OF GOODS, WORKS OR SERVICES............................................................17
9.1 Rules for purchasing goods, works or services................................................................................. 17
4
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
9.2 Consequences of non-compliance...................................................................................................... 17
ARTICLE 10 — IMPLEMENTATION OF ACTION TASKS BY SUBCONTRACTORS............................18
10.1 Rules for subcontracting action tasks.............................................................................................. 18
10.2 Consequences of non-compliance.................................................................................................... 18
ARTICLE 11 — IMPLEMENTATION OF ACTION TASKS BY AFFILIATED ENTITIES........................18
11.1 Rules for calling upon affiliated entities to implement part of the action........................................19
11.2 Consequences of non-compliance.................................................................................................... 20
ARTICLE 11a — FINANCIAL SUPPORT TO THIRD PARTIES.................................................................20
SECTION 2 RIGHTS AND OBLIGATIONS RELATED TO THE GRANT ADMINISTRATION.............. 20
ARTICLE 12 — GENERAL OBLIGATION TO INFORM............................................................................20
12.1 General obligation to provide information upon request.................................................................20
12.2 Obligation to keep information up to date and to inform about events and circumstances likely to
affect the Agreement........................................................................................................................20
12.3 Consequences of non-compliance.................................................................................................... 20
ARTICLE 13 — KEEPING RECORDS — SUPPORTING DOCUMENTATION.........................................21
13.1 Obligation to keep records and other supporting documentation.................................................... 21
13.2 Consequences of non-compliance.................................................................................................... 22
ARTICLE 14 — SUBMISSION OF DELIVERABLES................................................................................. 22
14.1 Obligation to submit deliverables.................................................................................................... 22
14.2 Consequences of non-compliance.................................................................................................... 22
ARTICLE 15 — REPORTING — PAYMENT REQUESTS.......................................................................... 22
15.1 Obligation to submit reports............................................................................................................ 22
15.2 Reporting periods............................................................................................................................. 22
15.2a Request(s) for further pre-financing payment(s)............................................................................22
15.3 Periodic reports — Requests for interim payments.........................................................................22
15.4 Final report — Request for payment of the balance....................................................................... 24
15.5 Information on cumulative expenditure incurred.............................................................................24
15.6 Currency for financial statements and conversion into euro........................................................... 24
15.7 Language of reports..........................................................................................................................25
15.8 Consequences of non-compliance.................................................................................................... 25
ARTICLE 16 — PAYMENTS AND PAYMENT ARRANGEMENTS...........................................................25
16.1 Payments to be made....................................................................................................................... 25
16.2 Pre-financing payment — Amount .................................................................................................25
16.3 Interim payments — Amount — Calculation..................................................................................25
16.4 Payment of the balance — Amount — Calculation........................................................................ 26
5
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
16.5 Notification of amounts due.............................................................................................................27
16.6 Currency for payments..................................................................................................................... 27
16.7 Payments to the coordinator — Distribution to the beneficiaries....................................................27
16.8 Bank account for payments..............................................................................................................27
16.9 Costs of payment transfers...............................................................................................................27
16.10 Date of payment............................................................................................................................. 28
16.11 Consequences of non-compliance.................................................................................................. 28
ARTICLE 17 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF
FINDINGS..................................................................................................................................... 28
17.1 Checks, reviews and audits by the Agency and the Commission....................................................28
17.2 Investigations by the European Anti-Fraud Office (OLAF)............................................................30
17.3 Checks and audits by the European Court of Auditors (ECA)........................................................30
17.4 Checks, reviews, audits and investigations for international organisations..................................... 31
17.5 Consequences of findings in checks, reviews, audits and investigations — Extension of
findings............................................................................................................................................. 31
17.6 Consequences of non-compliance.................................................................................................... 32
ARTICLE 18 — EVALUATION OF THE IMPACT OF THE ACTION....................................................... 32
18.1 Right to evaluate the impact of the action.......................................................................................32
18.2 Consequences of non-compliance.................................................................................................... 33
SECTION 3 OTHER RIGHTS AND OBLIGATIONS.......................................................................................33
ARTICLE 19 — PRE-EXISTING RIGHTS AND OWNERSHIP OF THE RESULTS (INCLUDING
INTELLECTUAL AND INDUSTRIAL PROPERTY RIGHTS)................................................. 33
19.1 Pre-existing rights and access rights to pre-existing rights............................................................. 33
19.2 Ownership of results and rights of use............................................................................................ 33
19.3 Consequences of non-compliance.................................................................................................... 33
ARTICLE 20 — CONFLICT OF INTERESTS.............................................................................................. 34
20.1 Obligation to avoid a conflict of interests....................................................................................... 34
20.2 Consequences of non-compliance.................................................................................................... 34
ARTICLE 21 — CONFIDENTIALITY...........................................................................................................34
21.1 General obligation to maintain confidentiality................................................................................ 34
21.2 Consequences of non-compliance.................................................................................................... 34
ARTICLE 22 — PROMOTING THE ACTION — VISIBILITY OF EU FUNDING....................................34
22.1 Communication activities by the beneficiaries................................................................................ 34
22.2 Communication activities by the Agency and the Commission...................................................... 35
22.3 Consequences of non-compliance.................................................................................................... 36
ARTICLE 23 — PROCESSING OF PERSONAL DATA...............................................................................36
6
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
23.1 Processing of personal data by the Agency and the Commission................................................... 36
23.2 Processing of personal data by the beneficiaries............................................................................. 37
23.3 Consequences of non-compliance.................................................................................................... 37
ARTICLE 24 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE AGENCY....................37
CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES....................................... 37
ARTICLE 25 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES............................37
25.1 Roles and responsibilities towards the Agency............................................................................... 37
25.2 Internal division of roles and responsibilities.................................................................................. 38
25.3 Internal arrangements between beneficiaries — Consortium agreement.........................................38
CHAPTER 6 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY — SANCTIONS
— DAMAGES — SUSPENSION — TERMINATION — FORCE MAJEURE................................ 39
SECTION 1 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY —
SANCTIONS.............................................................................................................................................. 39
ARTICLE 26 — REJECTION OF INELIGIBLE COSTS.............................................................................. 39
26.1 Conditions......................................................................................................................................... 39
26.2 Ineligible costs to be rejected — Calculation — Procedure............................................................39
26.3 Effects............................................................................................................................................... 39
ARTICLE 27 — REDUCTION OF THE GRANT......................................................................................... 40
27.1 Conditions......................................................................................................................................... 40
27.2 Amount to be reduced — Calculation — Procedure.......................................................................40
27.3 Effects............................................................................................................................................... 41
ARTICLE 28 — RECOVERY OF UNDUE AMOUNTS............................................................................... 41
28.1 Amount to be recovered — Calculation — Procedure....................................................................41
ARTICLE 29 — ADMINISTRATIVE SANCTIONS..................................................................................... 43
SECTION 2 LIABILITY FOR DAMAGES.........................................................................................................43
ARTICLE 30 — LIABILITY FOR DAMAGES.............................................................................................43
30.1 Liability of the Agency.................................................................................................................... 43
30.2 Liability of the beneficiaries............................................................................................................ 43
SECTION 3 SUSPENSION AND TERMINATION............................................................................................43
ARTICLE 31 — SUSPENSION OF PAYMENT DEADLINE....................................................................... 43
31.1 Conditions......................................................................................................................................... 44
31.2 Procedure.......................................................................................................................................... 44
ARTICLE 32 — SUSPENSION OF PAYMENTS.......................................................................................... 44
32.1 Conditions......................................................................................................................................... 44
32.2 Procedure.......................................................................................................................................... 45
ARTICLE 33 — SUSPENSION OF THE ACTION IMPLEMENTATION................................................... 45
7
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
33.1 Suspension of the action implementation, by the beneficiaries.......................................................45
33.2 Suspension of the action implementation, by the Agency...............................................................46
ARTICLE 34 — TERMINATION OF THE AGREEMENT OR OF THE PARTICIPATION OF ONE OR
MORE BENEFICIARIES..............................................................................................................47
34.1 Termination of the Agreement, by the beneficiaries........................................................................47
34.2 Termination of the participation of one or more beneficiaries, by the beneficiaries........................47
34.3 Termination of the Agreement or of the participation of one or more beneficiaries, by the
Agency..............................................................................................................................................49
SECTION 4 FORCE MAJEURE.......................................................................................................................... 51
ARTICLE 35 — FORCE MAJEURE.............................................................................................................. 51
CHAPTER 7 FINAL PROVISIONS...........................................................................................................................52
ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES...............................................................52
36.1 Form and means of communication.................................................................................................52
36.2 Date of communication.................................................................................................................... 52
36.3 Addresses for communication.......................................................................................................... 53
ARTICLE 37 — INTERPRETATION OF THE AGREEMENT.....................................................................53
37.1 Precedence of the Terms and Conditions over the Annexes............................................................53
37.2 Privileges and immunities................................................................................................................ 53
ARTICLE 38 — CALCULATION OF PERIODS, DATES AND DEADLINES........................................... 53
ARTICLE 39 — AMENDMENTS TO THE AGREEMENT......................................................................... 54
39.1 Conditions......................................................................................................................................... 54
39.2 Procedure.......................................................................................................................................... 54
ARTICLE 40 — ACCESSION TO THE AGREEMENT............................................................................... 54
40.1 Accession of the beneficiaries mentioned in the preamble..............................................................54
40.2 Addition of new beneficiaries.......................................................................................................... 55
ARTICLE 41 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES.............................................. 55
41.1 Applicable law..................................................................................................................................55
41.2 Dispute settlement............................................................................................................................ 55
ARTICLE 42 — ENTRY INTO FORCE OF THE AGREEMENT................................................................ 56
8
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
CHAPTER 1 GENERAL
ARTICLE 1 — SUBJECT OF THE AGREEMENT
This Agreement sets out the rights and obligations and the terms and conditions applicable to the grant
awarded to the beneficiaries for implementing the action set out in Chapter 2.
CHAPTER 2 ACTION
ARTICLE 2 — ACTION TO BE IMPLEMENTED
The grant is awarded for the action entitled ‘Joint Action on Implementation of Validated Best
Practices in Nutrition — Best-ReMaP’ (‘action’), as described in Annex 1.
ARTICLE 3 — DURATION AND STARTING DATE OF THE ACTION
The duration of the action will be 36 months as of 01/10/2020 (‘starting date of the action’).
ARTICLE 4 — ESTIMATED BUDGET AND BUDGET TRANSFERS
4.1 Estimated budget
The ‘estimated budget’ for the action is set out in Annex 2.
It contains the estimated eligible costs and the forms of costs, broken down by beneficiary (and
affiliated entity) and budget category (see Articles 5, 6 and 11).
4.2 Budget transfers
The estimated budget breakdown indicated in Annex 2 may be adjusted — without an amendment
(see Article 39) — by transfers of amounts between beneficiaries, budget categories and/or forms of
costs set out in Annex 2, if the action is implemented as described in Annex 1.
However, the beneficiaries may not add costs relating to subcontracts not provided for in Annex 1,
unless such additional subcontracts are approved by an amendment or in accordance with Article 10.
CHAPTER 3 GRANT
ARTICLE 5 — GRANT AMOUNT, FORM OF GRANT, REIMBURSEMENT RATE AND
FORMS OF COSTS
5.1 Maximum grant amount
The ‘maximum grant amount’ is EUR 6 000 000.00 (six million EURO).
5.2 Form of grant, reimbursement rate and forms of costs
9
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
The grant reimburses 80% of the action's eligible costs (see Article 6) (‘reimbursement of eligible
costs grant’) (see Annex 2).
The estimated eligible costs of the action are EUR 7 500 000.00 (seven million five hundred thousand
EURO).
Eligible costs (see Article 6) must be declared under the following forms ('forms of costs' or 'costs
forms'):
(a) for direct personnel costs: as actually incurred costs (actual costs);
(b) for direct costs of subcontracting: as actually incurred costs (actual costs);
(c) for other direct costs: as actually incurred costs (actual costs);
(d) for indirect costs: on the basis of a flat-rate applied as set out in Article 6.2.D (‘flat-rate costs’);
5.3 Final grant amount — Calculation
The ‘final grant amount’ depends on the actual extent to which the action is implemented in
accordance with the Agreement’s terms and conditions.
This amount is calculated by the Agency — when the payment of the balance is made — in the
following steps:
Step 1 – Application of the reimbursement rate to the eligible costs
Step 2 – Limit to the maximum grant amount
Step 3 – Reduction due to the no-profit rule
Step 4 – Reduction due to substantial errors, irregularities or fraud or serious breach of obligations
5.3.1 Step 1 — Application of the reimbursement rate to the eligible costs
The reimbursement rate (see Article 5.2) is applied to the eligible costs (actual costs and flat-rate costs;
see Article 6) declared by the beneficiaries and affiliated entities (see Article 15) and approved by
the Agency (see Article 16).
5.3.2 Step 2 — Limit to the maximum grant amount
If the amount obtained following Step 1 is higher than the maximum grant amount set out in
Article 5.1, it will be limited to the latter.
5.3.3 Step 3 — Reduction due to the no-profit rule
The grant must not produce a profit.
‘Profit’ means the surplus of the amount obtained following Steps 1 and 2 plus the action’s total
receipts, over the action’s total eligible costs.
The ‘action’s total eligible costs’ are the consolidated total eligible costs approved by the Agency.
10
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
The ‘action’s total receipts’ are the consolidated total receipts generated during its duration (see
Article 3).
The following are considered receipts:
(a) income generated by the action;
(b) financial contributions given by third parties to the beneficiary or to an affiliated entity
specifically to be used for costs that are eligible under the action.
The following are however not considered receipts:
(a) financial contributions by third parties, if they may be used to cover costs other than the eligible
costs (see Article 6);
(b) financial contributions by third parties with no obligation to repay any amount unused at the
end of the period set out in Article 3.
If there is a profit, it will be deducted in proportion to the final rate of reimbursement of the eligible
actual costs approved by the Agency (as compared to the amount calculated following Steps 1 and 2).
5.3.4 Step 4 — Reduction due to substantial errors, irregularities or fraud or serious breach
of obligations
If the grant is reduced (see Article 27), the Agency will calculate the reduced grant amount by
deducting the amount of the reduction (calculated in proportion to the seriousness of the errors,
irregularities or fraud or breach of obligations, in accordance with Article 27.2) from the maximum
grant amount set out in Article 5.1.
The final grant amount will be the lower of the following two:
- the amount obtained following Steps 1 to 3 or
- the reduced grant amount following Step 4.
5.4 Revised final grant amount — Calculation
If — after the payment of the balance (in particular, after checks, reviews, audits or investigations;
see Article 17) — the Agency rejects costs (see Article 26) or reduces the grant (see Article 27), it
will calculate the ‘revised final grant amount’ for the action or for the beneficiary concerned.
This amount is calculated by the Agency on the basis of the findings, as follows:
- in case of rejection of costs: by applying the reimbursement rate to the revised eligible costs
approved by the Agency for the beneficiary concerned;
- in case of reduction of the grant: by deducting the amount of the reduction (calculated in
proportion to the seriousness of the errors, irregularities or fraud or breach of obligations, in
accordance with Article 27.2) from the maximum grant amount set out in Article 5.1 or from the
maximum EU contribution indicated for the beneficiary in the estimated budget (see Annex 2).
In case of rejection of costs and reduction of the grant, the revised final grant amount will be the
lower of the two amounts above.
11
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS
6.1 General conditions for costs to be eligible
‘Eligible costs’ are costs that meet the following criteria:
(a) for actual costs:
(i) they must be actually incurred by the beneficiary;
(ii) they must be incurred in the period set out in Article 3, with the exception of costs relating
to the submission of the periodic report for the last reporting period and the final report
(see Article 15);
(iii) they must be indicated in the estimated budget set out in Annex 2;
(iv) they must be incurred in connection with the action as described in Annex 1 and necessary
for its implementation;
(v) they must be identifiable and verifiable, in particular recorded in the beneficiary’s accounts
in accordance with the accounting standards applicable in the country where the beneficiary
is established and with the beneficiary’s usual cost accounting practices;
(vi) they must comply with the applicable national law on taxes, labour and social security, and
(vii) they must be reasonable, justified and must comply with the principle of sound financial
management, in particular regarding economy and efficiency;
(b) for unit costs: not applicable;
(c) for flat-rate costs:
(i) they must be calculated by applying the flat-rate set out in Annex 2, and
(ii) the costs (actual costs) to which the flat-rate is applied must comply with the conditions for
eligibility set out in this Article.
(d) for lump sum costs: not applicable;
6.2 Specific conditions for costs to be eligible
Costs are eligible if they comply with the general conditions (see above) and the specific conditions
set out below, for each of the following budget categories:
A. direct personnel costs;
B. direct costs of subcontracting;
C. other direct costs;
D. indirect costs;
‘Direct costs’ are costs that are directly linked to the action implementation and can therefore be
attributed to it directly. They must not include any indirect costs (see Point D below).
12
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
‘Indirect costs’ are costs that are not directly linked to the action implementation and therefore cannot
be attributed directly to it.
A. Direct personnel costs
Types of eligible personnel costs
A.1 Personnel costs are eligible if they are related to personnel working for the beneficiary under an
employment contract (or equivalent appointing act) and assigned to the action (‘costs for employees
(or equivalent)’). They must be limited to salaries, social security contributions, taxes and other
costs included in the remuneration, if they arise from national law or the employment contract (or
equivalent appointing act).
They may also include additional remuneration for personnel assigned to the action (including
payments on the basis of supplementary contracts regardless of their nature), if:
(a) it is part of the beneficiary’s usual remuneration practices and is paid in a consistent manner
whenever the same kind of work or expertise is required;
(b) the criteria used to calculate the supplementary payments are objective and generally applied
by the beneficiary, regardless of the source of funding used.
A.2 The costs for natural persons working under a direct contract with the beneficiary other than
an employment contract or seconded by a third party against payment are eligible personnel costs,
if:
(a) the person works under the beneficiary’s instructions and, unless otherwise agreed with the
beneficiary, on the beneficiary’s premises;
(b) the result of the work carried out belongs to the beneficiary, and
(c) the costs are not significantly different from those for personnel performing similar tasks under
an employment contract with the beneficiary.
Calculation
Personnel costs must be calculated by the beneficiaries as follows:
- for persons working exclusively on the action:
{monthly rate for the person
multiplied by
number of actual months worked on the action}.
The months declared for these persons may not be declared for any other EU or Euratom grant.
The ‘monthly rate’ is calculated as follows:
{annual personnel costs for the person
divided by
12}
13
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
using the personnel costs for each full financial year covered by the reporting period concerned.
If a financial year is not closed at the end of the reporting period, the beneficiaries must use the
monthly rate of the last closed financial year available.
- for all other persons:
{daily rate for the person
multiplied by
number of actual days worked on the action (rounded up or down to the nearest half-day)}.
The number of actual days declared for a person must be identifiable and verifiable (see
Article 13).
The total number of days declared in EU or Euratom grants, for a person for a year, cannot be
higher than the annual productive days used for the calculations of the daily rate. Therefore,
the maximum number of days that can be declared for the grant are:
{number of annual productive days for the year (see below)
minus
total number of days declared by the beneficiary, for that person for that year, for other EU or Euratom
grants}.
The ‘daily rate’ is calculated as follows:
{annual personnel costs for the person
divided by
number of individual annual productive days}
using the personnel costs and the number of annual productive days for each full financial
year covered by the reporting period concerned. If a financial year is not closed at the end of
the reporting period, the beneficiaries must use the daily rate of the last closed financial year
available.
The ‘number of individual annual productive days’ is the total actual days worked by the person
in the year. It may not include holidays and other absences (such as sick leave, maternity leave,
special leave, etc). However, it may include overtime and time spent in meetings, trainings and
other similar activities.
B. Direct costs of subcontracting (including related duties, taxes and charges, such as non-
deductible value added tax (VAT) paid by beneficiaries that are not public bodies acting as public
authority) are eligible if the conditions in Article 10.1.1 are met.
C. Other direct costs
C.1 Travel costs and related subsistence allowances (including related duties, taxes and charges,
such as non-deductible value added tax (VAT) paid by beneficiaries that are not public bodies acting
as public authority) are eligible if they are in line with the beneficiary’s usual practices on travel.
C.2 The depreciation costs of equipment, infrastructure or other assets (new or second-hand)
as recorded in the beneficiary’s accounts are eligible, if they were purchased in accordance
14
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
with Article 9.1.1 and written off in accordance with international accounting standards and the
beneficiary’s usual accounting practices.
The costs of renting or leasing equipment, infrastructure or other assets (including related duties,
taxes and charges, such as non-deductible value added tax (VAT) paid by beneficiaries that are not
public bodies acting as public authority) are also eligible, if they do not exceed the depreciation costs
of similar equipment, infrastructure or assets and do not include any financing fees.
The only portion of the costs that will be taken into account is that which corresponds to the duration
of the action and rate of actual use for the purposes of the action.
C.3 Costs of other goods and services (including related duties, taxes and charges, such as non-
deductible value added tax (VAT) paid by beneficiaries that are not public bodies acting as public
authority) are eligible, if they are purchased specifically for the action and in accordance with
Article 9.1.1.
Such goods and services include, for instance, consumables and supplies, dissemination, protection
of results, certificates on the financial statements (if they are required by the Agreement), translations
and publications.
D. Indirect costs
Indirect costs are eligible if they are declared on the basis of the flat-rate of 7% of the eligible direct
costs (see Article 5.2 and Points A to C above).
Beneficiaries receiving an operating grant1 financed by the EU or Euratom budget cannot declare
indirect costs for the period covered by the operating grant.
6.3 Conditions for costs of affiliated entities to be eligible
Costs incurred by affiliated entities are eligible if they fulfil — mutatis mutandis — the general and
specific conditions for eligibility set out in this Article (Article 6.1 and 6.2) and Article 11.1.1.
6.4 Ineligible costs
‘Ineligible costs’ are:
(a) costs that do not comply with the conditions set out above (Article 6.1 to 6.3), in particular:
(i) costs related to return on capital;
(ii) debt and debt service charges;
(iii) provisions for future losses or debts;
(iv) interest owed;
1 For the definition, see Article 121(1)(b) of Regulation (EU, Euratom) No 966/2012 of the European Parliament and
of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing
Council Regulation (EC, Euratom) No 1605/2002 (OJ L 218, 26.10.2012, p.1) (‘Financial Regulation No 966/2012’):
‘operating grant’ means direct financial contribution, by way of donation, from the budget in order to finance the
functioning of a body which pursues an aim of general EU interest or has an objective forming part of and supporting
an EU policy.
15
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
(v) doubtful debts;
(vi) currency exchange losses;
(vii) bank costs charged by the beneficiary’s bank for transfers from the Agency;
(viii) excessive or reckless expenditure;
(ix) deductible VAT;
(x) costs incurred during suspension of the implementation of the action (see Article 33);
(xi) in-kind contributions provided by third parties;
(b) costs declared under another EU or Euratom grant (including grants awarded by a Member
State and financed by the EU or Euratom budget and grants awarded by bodies other than the
Agency for the purpose of implementing the EU or Euratom budget); in particular, indirect
costs if the beneficiary is already receiving an operating grant financed by the EU or Euratom
budget in the same period;
(c) costs for staff of a national (or local) administration, for activities that are part of the
administration’s normal activities (i.e. not undertaken only because of the grant);
(d) costs (especially travel and subsistence costs) for staff or representatives of EU institutions,
bodies or agencies.
6.5 Consequences of declaration of ineligible costs
Declared costs that are ineligible will be rejected (see Article 26).
This may also lead to any of the other measures described in Chapter 6.
CHAPTER 4 RIGHTS AND OBLIGATIONS OF THE PARTIES
SECTION 1 RIGHTS AND OBLIGATIONS RELATED TO IMPLEMENTING THE
ACTION
ARTICLE 7 — GENERAL OBLIGATION TO PROPERLY IMPLEMENT THE ACTION
7.1 General obligation to properly implement the action
The beneficiaries must implement the action as described in Annex 1 and in compliance with the
provisions of the Agreement and all legal obligations under applicable EU, international and national
law.
7.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
16
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD PARTIES
INVOLVED IN THE ACTION
The beneficiaries must have the appropriate resources to implement the action.
If it is necessary to implement the action, the beneficiaries may:
- purchase goods, works and services (see Article 9);
- call upon subcontractors to implement action tasks described in Annex 1 (see Article 10);
- call upon affiliated entities to implement action tasks described in Annex 1 (see Article 11).
In these cases, the beneficiaries retain sole responsibility towards the Agency and the other
beneficiaries for implementing the action.
ARTICLE 8a — IMPLEMENTATION OF ACTION TASKS BY BENEFICIARIES NOT
RECEIVING EU FUNDING
Not applicable
ARTICLE 9 — PURCHASE OF GOODS, WORKS OR SERVICES
9.1 Rules for purchasing goods, works or services
9.1.1 If necessary to implement the action, the beneficiaries may purchase goods, works or services.
The beneficiaries must make such purchases ensuring the best value for money or, if appropriate, the
lowest price. In doing so, they must avoid any conflict of interests (see Article 20).
The beneficiaries must ensure that the Agency, the Commission, the European Court of Auditors
(ECA) and the European Anti-fraud Office (OLAF) can exercise their rights under Articles 17 and
18 also towards their contractors.
9.1.2 Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC2 (or
2014/24/EU3) or ‘contracting entities’ within the meaning of Directive 2004/17/EC4 (or 2014/25/EU5)
must comply with the applicable national law on public procurement.
9.2 Consequences of non-compliance
2 Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of
procedures for the award of public work contracts, public supply contracts and public service contracts (OJ L 134,
30.04.2004, p. 114).
3 Directive 2014/24/EU of the European Parliament and of the Council of 26 February 2014 on public procurement and
repealing Directive 2004/18/EC (OJ L 94, 28.3.2014, p. 65).
4 Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the procurement
procedures of entities operating in the water, energy, transport and postal services sectors (OJ L 134, 30.04.2004, p. 1).
5 Directive 2014/25/EU of the European Parliament and of the Council of 26 February 2014 on procurement by entities
operating in the water, energy, transport and postal services sectors and repealing Directive 2004/17/EC (OJ L 94,
28.3.2014, p. 243).
17
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
If a beneficiary breaches any of its obligations under Article 9.1.1, the costs related to the contract
concerned will be ineligible (see Article 6) and will be rejected (see Article 26).
If a beneficiary breaches any of its obligations under Article 9.1.2, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 10 — IMPLEMENTATION OF ACTION TASKS BY SUBCONTRACTORS
10.1 Rules for subcontracting action tasks
10.1.1 If necessary to implement the action, the beneficiaries may award subcontracts covering the
implementation of certain action tasks described in Annex 1.
Subcontracting may cover only a limited part of the action.
The beneficiaries must award the subcontracts ensuring the best value for money or, if appropriate,
the lowest price. In doing so, they must avoid any conflict of interests (see Article 20).
The tasks to be implemented and the estimated cost for each subcontract must be set out in Annex
1 and the total estimated costs of subcontracting per beneficiary must be set out in Annex 2. The
Agency may however approve subcontracts not set out in Annex 1 and 2 without amendment (see
Article 39), if:
- they are specifically justified in the periodic technical report and
- they do not entail changes to the Agreement which would call into question the decision
awarding the grant or breach the principle of equal treatment of applicants.
The beneficiaries must ensure that the Agency, the Commission, the European Court of Auditors
(ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 17 and
18 also towards their subcontractors.
10.1.2 The beneficiaries must ensure that their obligations under Articles 20, 21, 22 and 30 also apply
to the subcontractors.
Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC (or
2014/24/EU) or ‘contracting entities’ within the meaning of Directive 2004/17/EC (or 2014/25/EU)
must comply with the applicable national law on public procurement.
10.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under Article 10.1.1, the costs related to the subcontract
concerned will be ineligible (see Article 6) and will be rejected (see Article 26).
If a beneficiary breaches any of its obligations under Article 10.1.2, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 11 — IMPLEMENTATION OF ACTION TASKS BY AFFILIATED ENTITIES
18
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
11.1 Rules for calling upon affiliated entities to implement part of the action
11.1.1 The following 'affiliated entities'6 may implement the action tasks attributed to them in
Annex 1:
- GESUNDHEIT OSTERREICH GMBH (GOeG), affiliated or linked to BMASGK
- OSTERREICHISCHE AGENTUR FUR GESUNDHEIT UND ERNAHRUNGSSICHERHEIT
GMBH (AGES), affiliated or linked to BMASGK
- ZAVOD ZA JAVNO ZDRAVSTVO FEDERACIJEBOSNE I HERCEGOVINE (PHI-FBH),
affiliated or linked to MCA
- JZU INSTITUT ZA JAVNO ZDRAVSTVO REPUBLIKE SRPSKE (PHI-RS), affiliated or
linked to MCA
- KOBENHAVNS KOMMUNE (CPH-MUN), affiliated or linked to DVFA
- TERVISE ARENGU INSTITUUT (NIHD), affiliated or linked to MoSA
- MINISTERE DES AFFAIRES SOCIALES ET DE LA SANTE (MoH-FR), affiliated or linked
to ANSES
- AGENCE NATIONALE DE SANTE PUBLIQUE (SPF), affiliated or linked to ANSES
- ORSZAGOS GYOGYSZERESZETI ES ELELMEZES-EGESZSEGUGYI INTEZET (NIPN),
affiliated or linked to SU
- UNIVERSITY COLLEGE CORK - NATIONAL UNIVERSITY OF IRELAND, CORK
(CHDR), affiliated or linked to DoH
- FOOD SAFETY AUTHORITY OF IRELAND (FSAI), affiliated or linked to DoH
- UNIVERSIDADE DO PORTO (FCNAUP), affiliated or linked to DGS
The affiliated entities may declare as eligible the costs they incur for implementing the action tasks
in accordance with Article 6.3.
The beneficiaries must ensure that the Agency, the Commission, the European Court of Auditors
(ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 17 and
18 also towards their affiliated entities.
11.1.2 The beneficiaries must ensure that their obligations under Articles 13, 15, 20, 21 and 22 also
apply to their affiliated entities.
6 For the definition, see Article 122 of the Financial Regulation (EU, Euratom) No 966/2012: entities affiliated to the
beneficiary are:
(a) entities that form a ‘sole beneficiary’ (i.e. where an entity is formed of several entities that satisfy the criteria for
being awarded a grant, including where the entity is specifically established for the purpose of implementing
an action to be financed by a grant);
(b) entities that satisfy the eligibility criteria and that do not fall within one of the situations referred to in Article
131(4) and that have a link with the beneficiary, in particular a legal or capital link, which is neither limited to
the action nor established for the sole purpose of its implementation.
19
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
11.2 Consequences of non-compliance
If any obligation under Article 11.1.1 is breached, the costs of the affiliated entity will be ineligible
(see Article 6) and will be rejected (see Article 26).
If any obligation under Article 11.1.2 is breached, the grant may be reduced (see Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 11a — FINANCIAL SUPPORT TO THIRD PARTIES
Not applicable
SECTION 2 RIGHTS AND OBLIGATIONS RELATED TO THE GRANT
ADMINISTRATION
ARTICLE 12 — GENERAL OBLIGATION TO INFORM
12.1 General obligation to provide information upon request
The beneficiaries must provide — during implementation of the action or afterwards and in accordance
with Article 25.2 — any information requested in order to verify eligibility of the costs, proper
implementation of the action and compliance with any other obligation under the Agreement.
12.2 Obligation to keep information up to date and to inform about events and
circumstances likely to affect the Agreement
Each beneficiary must keep information stored in the Participant Portal Beneficiary Register (via
the electronic exchange system; see Article 36) up to date, in particular, its name, address, legal
representatives, legal form and organisation type.
Each beneficiary must immediately inform the coordinator — which must immediately inform the
Agency and the other beneficiaries — of any of the following:
(a) events which are likely to affect significantly or delay the implementation of the action or the
EU’s financial interests, in particular:
(i) changes in its legal, financial, technical, organisational or ownership situation or those
of its affiliated entities and
(ii) changes in the name, address, legal form, organisation type of its affiliated entities;
(b) circumstances affecting:
(i) the decision to award the grant or
(ii) compliance with requirements under the Agreement.
12.3 Consequences of non-compliance
20
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 13 — KEEPING RECORDS — SUPPORTING DOCUMENTATION
13.1 Obligation to keep records and other supporting documentation
The beneficiaries must — for a period of five years after the payment of the balance — keep records
and other supporting documentation, in order to prove the proper implementation of the action and
the costs they declare as eligible.
They must make them available upon request (see Article 12) or in the context of checks, reviews,
audits or investigations (see Article 17).
If there are on-going checks, reviews, audits, investigations, litigation or other pursuits of claims under
the Agreement (including the extension of findings; see Article 17), the beneficiaries must keep the
records and other supporting documentation until the end of these procedures.
The beneficiaries must keep the original documents. Digital and digitalised documents are considered
originals if they are authorised by the applicable national law. The Agency may accept non-original
documents if it considers that they offer a comparable level of assurance.
13.1.1 Records and other supporting documentation on the technical implementation
The beneficiaries must keep records and other supporting documentation on the technical
implementation of the action, in line with the accepted standards in the respective field.
13.1.2 Records and other documentation to support the costs declared
The beneficiaries must keep the records and documentation supporting the costs declared, in particular
the following:
(a) for actual costs: adequate records and other supporting documentation to prove the costs
declared, such as contracts, subcontracts, invoices and accounting records. In addition, the
beneficiaries’ usual cost accounting practices and internal control procedures must enable direct
reconciliation between the amounts declared, the amounts recorded in their accounts and the
amounts stated in the supporting documentation;
(b) for unit costs: not applicable;
(c) for flat-rate costs: adequate records and other supporting documentation to prove the eligibility
of the costs to which the flat-rate is applied. The beneficiaries do not need to identify the costs
covered or provide supporting documentation (such as accounting statements) to prove the
amount declared at a flat-rate;
(d) for lump sum costs: not applicable;
In addition, for personnel costs (declared as actual costs), the beneficiaries must keep time records
for the number of days declared. The time records must be in writing and approved by the persons
working on the action and their supervisors, at least monthly. In the absence of reliable time records
21
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
of the days worked on the action, the Agency may accept alternative evidence supporting the number
of days declared, if it considers that it offers an adequate level of assurance.
As an exception, for persons working exclusively on the action, there is no need to keep time records,
if the beneficiary signs a declaration confirming that the persons concerned have worked exclusively
on the action.
For costs declared by affiliated entities (see Article 11), it is the beneficiary that must keep the originals
of the financial statements and the certificates on the financial statements of its affiliated entities.
13.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, costs insufficiently substantiated
will be ineligible (see Article 6) and will be rejected (see Article 26), and the grant may be reduced
(see Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 14 — SUBMISSION OF DELIVERABLES
14.1 Obligation to submit deliverables
The coordinator must submit the ‘deliverables’ identified in Annex 1, in accordance with the timing
and conditions set out in it.
14.2 Consequences of non-compliance
If the coordinator breaches any of its obligations under this Article, the Agency may apply any of the
measures described in Chapter 6.
ARTICLE 15 — REPORTING — PAYMENT REQUESTS
15.1 Obligation to submit reports
The coordinator must submit to the Agency (see Article 36) the technical and financial report(s) set
out in this Article. These reports include request(s) for payment and must be drawn up using the forms
and templates provided in the electronic exchange system (see Article 36).
15.2 Reporting periods
The action is divided into the following ‘reporting periods’:
- RP1: from month 1 to month 18
- RP2: from month 19 to month 36
15.2a Request(s) for further pre-financing payment(s)
Not applicable
15.3 Periodic reports — Requests for interim payments
22
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
The coordinator must submit a periodic report within 60 days following the end of each reporting
period.
The periodic report must include the following:
(a) a ‘periodic technical report’ containing:
(i) an explanation of the work carried out by the beneficiaries;
(ii) an overview of the progress towards the objectives of the action, including milestones
and deliverables identified in Annex 1.
This report must include explanations justifying the differences between work expected
to be carried out in accordance with Annex 1 and that actually carried out;
(iii) a summary for publication by the Agency;
(iv) the answers to the ‘questionnaire’: covering issues related to the action implementation
and its impact;
(b) a ‘periodic financial report’ containing:
(i) an ‘individual financial statement’ (see Annex 4) from each beneficiary and from each
affiliated entity, for the reporting period concerned.
The individual financial statement must detail the eligible costs (actual costs and flat-rate
costs; see Article 6) for each budget category (see Annex 2).
The beneficiaries and affiliated entities must declare all eligible costs, even if — for
actual costs and flat-rate costs — they exceed the amounts indicated in the estimated
budget (see Annex 2). Amounts which are not declared in the individual financial
statement will not be taken into account by the Agency.
If an individual financial statement is not submitted for a reporting period, it may be
included in the periodic financial report for the next reporting period.
The individual financial statements of the last reporting period must also detail the
receipts of the action (see Article 5.3.3).
Each beneficiary and each affiliated entity must certify that:
- the information provided is full, reliable and true;
- the costs declared are eligible (see Article 6);
- the costs can be substantiated by adequate records and supporting documentation
(see Article 13) that will be produced upon request (see Article 12) or in the context
of checks, reviews, audits and investigations (see Article 17), and
- for the last reporting period: that all the receipts have been declared (see
Article 5.3.3);
(ii) an explanation of the use of resources and the information on subcontracting (see
23
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
Article 10) from each beneficiary and from each affiliated entity, for the reporting period
concerned;
(iii) not applicable;
(iv) a ‘periodic summary financial statement’, created automatically by the electronic
exchange system, consolidating the individual financial statements for the reporting
period concerned and including — except for the last reporting period — the request
for interim payment;
(v) a ‘certificate on the financial statements’ (drawn up in accordance with Annex 5) for
each beneficiary and for each affiliated entity, if:
- the (cumulative) amount of EU contribution it requests as reimbursement of actual
costs (and for which no certificate has yet been submitted) is EUR 150 000 or
more and
- the maximum EU contribution indicated, for that beneficiary or affiliated entity,
in the estimated budget (see Annex 2) as reimbursement of actual costs is
EUR 200 000 or more.
15.4 Final report — Request for payment of the balance
In addition to the periodic report for the last reporting period, the coordinator must submit the final
report within 60 days following the end of the last reporting period.
The final report must include the following:
(a) a ‘final technical report’ with a summary for publication containing:
(i) an overview of the results and their dissemination;
(ii) the conclusions on the action and
(iii) the impact of the action;
(b) a ‘final financial report’ containing a ‘final summary financial statement’, created
automatically by the electronic exchange system, consolidating the individual financial
statements for all reporting periods and including the request for payment of the balance.
15.5 Information on cumulative expenditure incurred
Not applicable
15.6 Currency for financial statements and conversion into euro
Financial statements must be drafted in euro.
Beneficiaries and affiliated entities with accounting established in a currency other than the euro
must convert the costs recorded in their accounts into euro at the average of the daily exchange
rates published in the C series of the Official Journal of the European Union, calculated over the
corresponding reporting period.
24
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
If no daily euro exchange rate is published in the Official Journal of the European Union for the
currency in question, they must be converted at the average of the monthly accounting rates published
on the Commission’s website, calculated over the corresponding reporting period.
Beneficiaries and affiliated entities with accounting established in euro must convert costs incurred
in another currency into euro according to their usual accounting practices.
15.7 Language of reports
All report(s) (including financial statements) must be submitted in the language of the Agreement.
15.8 Consequences of non-compliance
If the report(s) submitted do not comply with this Article, the Agency may suspend the payment
deadline (see Article 31) and apply any of the other measures described in Chapter 6.
If the coordinator breaches its obligation to submit the report(s) and if it fails to comply with this
obligation within 30 days following a written reminder, the Agency may terminate the Agreement
(see Article 34) or apply any of the other measures described in Chapter 6.
ARTICLE 16 — PAYMENTS AND PAYMENT ARRANGEMENTS
16.1 Payments to be made
The following payments will be made to the coordinator:
- a pre-financing payment;
- one or more interim payments, on the basis of the request(s) for interim payment (see
Article 15), and
- one payment of the balance, on the basis of the request for payment of the balance (see
Article 15).
16.2 Pre-financing payment — Amount
The aim of the pre-financing is to provide the beneficiaries with a float.
It remains the property of the EU until the payment of the balance.
The amount of the pre-financing payment will be EUR 3 000 000.00 (three million EURO).
The Agency will — except if Article 32 applies — make the pre-financing payment to the coordinator
within 30 days, either from the entry into force of the Agreement (see Article 42) or from 10 days
before the starting date of the action (see Article 3) , whichever is the latest.
16.3 Interim payments — Amount — Calculation
Interim payments reimburse the eligible costs incurred for the implementation of the action during
the corresponding reporting periods.
25
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
The Agency will pay to the coordinator the amount due as interim payment within 90 days from
receiving the periodic report (see Article 15.3), except if Articles 31 or 32 apply.
Payment is subject to the approval of the periodic report. Its approval does not imply recognition of
compliance, authenticity, completeness or correctness of its content.
The amount due as interim payment is calculated by the Agency in the following steps:
Step 1 – Application of the reimbursement rate
Step 2 – Limit to 90% of the maximum grant amount
16.3.1 Step 1 — Application of the reimbursement rate
The reimbursement rate (see Article 5.2) is applied to the eligible costs (actual costs and flat-rate costs;
see Article 6) declared by the beneficiaries and the affiliated entities (see Article 15) and approved by
the Agency (see above) for the concerned reporting period.
16.3.2 Step 2 — Limit to 90% of the maximum grant amount
The total amount of pre-financing and interim payments must not exceed 90% of the maximum grant
amount set out in Article 5.1. The maximum amount for the interim payment will be calculated as
follows:
{90% of the maximum grant amount (see Article 5.1)
minus
{pre-financing and previous interim payments}}.
16.4 Payment of the balance — Amount — Calculation
The payment of the balance reimburses the remaining part of the eligible costs incurred by the
beneficiaries for the implementation of the action.
If the total amount of earlier payments is greater than the final grant amount (see Article 5.3), the
payment of the balance takes the form of a recovery (see Article 28).
If the total amount of earlier payments is lower than the final grant amount, the Agency will pay the
balance within 90 days from receiving the final report (see Article 15.4), except if Articles 31 or 32
apply.
Payment is subject to the approval of the final report. Its approval does not imply recognition of
compliance, authenticity, completeness or correctness of its content.
The amount due as the balance is calculated by the Agency by deducting the total amount of pre-
financing and interim payments (if any) already made, from the final grant amount determined in
accordance with Article 5.3:
{final grant amount (see Article 5.3)
minus
{pre-financing and interim payments (if any) made}}.
26
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
If the balance is positive, it will be paid to the coordinator.
The amount to be paid may however be offset — without the beneficiaries’ consent — against any
other amount owed by a beneficiary to the Agency, the Commission or another executive agency
(under the EU or Euratom budget), up to the maximum EU contribution indicated, for that beneficiary,
in the estimated budget (see Annex 2).
If the balance is negative, it will be recovered from the coordinator (see Article 28).
16.5 Notification of amounts due
When making payments, the Agency will formally notify to the coordinator the amount due,
specifying that it concerns an interim payment or the payment of the balance.
For the payment of the balance, the notification will also specify the final grant amount.
In the case of reduction of the grant or recovery of undue amounts, the notification will be preceded
by the contradictory procedure set out in Articles 27 and 28.
16.6 Currency for payments
The Agency will make all payments in euro.
16.7 Payments to the coordinator — Distribution to the beneficiaries
Payments will be made to the coordinator.
Payments to the coordinator will discharge the Agency from its payment obligation.
The coordinator must distribute the payments between the beneficiaries without unjustified delay.
Pre-financing may however be distributed only:
(a) if 90% of the beneficiaries have acceded to the Agreement (see Article 40) and
(b) to beneficiaries that have acceded to the Agreement (see Article 40).
16.8 Bank account for payments
All payments will be made to the following bank account:
Name of bank: BANK OF SLOVENIA
Full name of the account holder: NATIONAL INSTITUTE OF PUBLIC HEALTH
Full account number (including bank codes):
IBAN code: SI56011006000043188
16.9 Costs of payment transfers
The cost of the payment transfers is borne as follows:
- the Agency bears the cost of transfers charged by its bank;
- the beneficiary bears the cost of transfers charged by its bank;
27
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
- the party causing a repetition of a transfer bears all costs of the repeated transfer.
16.10 Date of payment
Payments by the Agency are considered to have been carried out on the date when they are debited
to its account.
16.11 Consequences of non-compliance
16.11.1 If the Agency does not pay within the payment deadlines (see above), the beneficiaries are
entitled to late-payment interest at the rate applied by the European Central Bank (ECB) for its main
refinancing operations in euros (‘reference rate’), plus three and a half points. The reference rate is
the rate in force on the first day of the month in which the payment deadline expires, as published in
the C series of the Official Journal of the European Union.
If the late-payment interest is lower than or equal to EUR 200, it will be paid to the coordinator only
upon request submitted within two months of receiving the late payment.
Late-payment interest is not due if all beneficiaries are EU Member States (including regional and
local government authorities or other public bodies acting on behalf of a Member State for the purpose
of this Agreement).
Suspension of the payment deadline or payments (see Articles 31 and 32) will not be considered as
late payment.
Late-payment interest covers the period running from the day following the due date for payment (see
above), up to and including the date of payment.
Late-payment interest is not considered for the purposes of calculating the final grant amount.
16.11.2 If the coordinator breaches any of its obligations under this Article, the grant may be reduced
(see Article 27) and the Agreement or the participation of the coordinator may be terminated (see
Article 34).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 17 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION
OF FINDINGS
17.1 Checks, reviews and audits by the Agency and the Commission
17.1.1 Right to carry out checks
The Agency or the Commission will — during the implementation of the action or afterwards — check
the proper implementation of the action and compliance with the obligations under the Agreement,
including assessing deliverables and reports.
For this purpose, the Agency or the Commission may be assisted by external persons or bodies.
The Agency or the Commission may also request additional information in accordance with Article 12.
The Agency or the Commission may request beneficiaries to provide such information to it directly.
28
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
17.1.2 Right to carry out reviews
The Agency or the Commission may — during the implementation of the action or afterwards —
carry out reviews on the proper implementation of the action (including assessment of deliverables
and reports) and compliance with the obligations under the Agreement.
Reviews may be started up to five years after the payment of the balance. They will be formally
notified to the coordinator or beneficiary concerned and will be considered to have started on the date
of the formal notification.
If the review is carried out on a third party (see Articles 9 to 11a), the beneficiary concerned must
inform the third party.
The Agency or the Commission may carry out reviews directly (using its own staff) or indirectly (using
external persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned
of the identity of the external persons or bodies. They have the right to object to the appointment on
grounds of commercial confidentiality.
The coordinator or beneficiary concerned must provide — within the deadline requested — any
information and data in addition to deliverables and reports already submitted (including information
on the use of resources). The Agency or the Commission may request beneficiaries to provide such
information to it directly.
The coordinator or beneficiary concerned may be requested to participate in meetings, including with
external experts.
For on-the-spot reviews, the beneficiaries must allow access to their sites and premises, including to
external persons or bodies, and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
On the basis of the review findings, a ‘review report’ will be drawn up.
The Agency or the Commission will formally notify the review report to the coordinator or beneficiary
concerned, which has 30 days to formally notify observations (‘contradictory review procedure’).
Reviews (including review reports) are in the language of the Agreement.
17.1.3 Right to carry out audits
The Agency or the Commission may — during the implementation of the action or afterwards —
carry out audits on the proper implementation of the action and compliance with the obligations under
the Agreement.
Audits may be started up to five years after the payment of the balance. They will be formally
notified to the coordinator or beneficiary concerned and will be considered to have started on the date
of the formal notification.
29
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
If the audit is carried out on a third party (see Articles 9 to 11a), the beneficiary concerned must inform
the third party.
The Agency or the Commission may carry out audits directly (using its own staff) or indirectly (using
external persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned
of the identity of the external persons or bodies. They have the right to object to the appointment on
grounds of commercial confidentiality.
The coordinator or beneficiary concerned must provide — within the deadline requested — any
information (including complete accounts, individual salary statements or other personal data) to
verify compliance with the Agreement. The Agency or the Commission may request beneficiaries to
provide such information to it directly.
For on-the-spot audits, the beneficiaries must allow access to their sites and premises, including to
external persons or bodies, and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
On the basis of the audit findings, a ‘draft audit report’ will be drawn up.
The Agency or the Commission will formally notify the draft audit report to the coordinator or
beneficiary concerned, which has 30 days to formally notify observations (‘contradictory audit
procedure’). This period may be extended by the Agency or the Commission in justified cases.
The ‘final audit report’ will take into account observations by the coordinator or beneficiary
concerned. The report will be formally notified to it.
Audits (including audit reports) are in the language of the Agreement.
The Agency or the Commission may also access the beneficiaries’ statutory records for the periodical
assessment of flat-rate amounts.
17.2 Investigations by the European Anti-Fraud Office (OLAF)
Under Regulations No 883/20137 and No 2185/968 (and in accordance with their provisions and
procedures), the European Anti-Fraud Office (OLAF) may — at any moment during implementation
of the action or afterwards — carry out investigations, including on-the-spot checks and inspections,
to establish whether there has been fraud, corruption or any other illegal activity affecting the financial
interests of the EU.
17.3 Checks and audits by the European Court of Auditors (ECA)
Under Article 287 of the Treaty on the Functioning of the European Union (TFEU) and Article 161 of
7 Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013
concerning investigations conducted by the European Anti-Fraud Office (OLAF) and repealing Regulation (EC)
No 1073/1999 of the European Parliament and of the Council and Council Regulation (Euratom) No 1074/1999 (OJ
L 232, 18.09.2013, p. 1).
8 Council Regulation (Euratom, EC) No 2185/1996 of 11 November 1996 concerning on-the-spot checks and inspections
carried out by the Commission in order to protect the European Communities' financial interests against fraud and other
irregularities (OJ L 292, 15.11.1996, p. 2).
30
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
the Financial Regulation No 966/20129, the European Court of Auditors (ECA) may — at any moment
during implementation of the action or afterwards — carry out audits.
The ECA has the right of access for the purpose of checks and audits.
17.4 Checks, reviews, audits and investigations for international organisations
Not applicable
17.5 Consequences of findings in checks, reviews, audits and investigations — Extension of
findings
17.5.1 Findings in this grant
Findings in checks, reviews, audits or investigations carried out in the context of this grant may lead
to the rejection of ineligible costs (see Article 26), reduction of the grant (see Article 27), recovery of
undue amounts (see Article 28) or to any of the other measures described in Chapter 6.
Rejection of costs or reduction of the grant after the payment of the balance will lead to a revised final
grant amount (see Article 5.4).
Findings in checks, reviews, audits or investigations may lead to a request for amendment for the
modification of Annex 1 (see Article 39).
Checks, reviews, audits or investigations that find systemic or recurrent errors, irregularities, fraud or
breach of obligations may also lead to consequences in other EU or Euratom grants awarded under
similar conditions (‘extension of findings from this grant to other grants’).
Moreover, findings arising from an OLAF investigation may lead to criminal prosecution under
national law.
17.5.2 Findings in other grants
The Agency or the Commission may extend findings from other grants to this grant (‘extension of
findings from other grants to this grant’), if:
(a) the beneficiary concerned is found, in other EU or Euratom grants awarded under similar
conditions, to have committed systemic or recurrent errors, irregularities, fraud or breach of
obligations that have a material impact on this grant and
(b) those findings are formally notified to the beneficiary concerned — together with the list of
grants affected by the findings — no later than five years after the payment of the balance
of this grant.
The extension of findings may lead to the rejection of costs (see Article 26), reduction of the grant
(see Article 27), recovery of undue amounts (see Article 28), suspension of payments (see Article 32),
suspension of the action implementation (see Article 33) or termination (see Article 34).
9 Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on the
financial rules applicable to the general budget of the Union and repealing Council Regulation (EC, Euratom) No
1605/2002 (OJ L 298, 26.10.2012, p. 1).
31
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
17.5.3 Procedure
The Agency or the Commission will formally notify the beneficiary concerned the systemic or
recurrent errors and its intention to extend these audit findings, together with the list of grants affected.
17.5.3.1 If the findings concern eligibility of costs: the formal notification will include:
(a) an invitation to submit observations on the list of grants affected by the findings;
(b) the request to submit revised financial statements for all grants affected;
(c) the correction rate for extrapolation established by the Agency or the Commission on
the basis of the systemic or recurrent errors, to calculate the amounts to be rejected, if the
beneficiary concerned:
(i) considers that the submission of revised financial statements is not possible or practicable
or
(ii) does not submit revised financial statements.
The beneficiary concerned has 90 days from receiving notification to submit observations, revised
financial statements or to propose a duly substantiated alternative correction method. This period
may be extended by the Agency or the Commission in justified cases.
The Agency or the Commission may then start a rejection procedure in accordance with Article 26,
either on the basis of the revised financial statements, the alternative method or the correction rate
announced.
17.5.3.2 If the findings concern substantial errors, irregularities or fraud or serious breach of
obligations: the formal notification will include:
(a) an invitation to submit observations on the list of grants affected by the findings and
(b) the flat-rate the Agency or the Commission intends to apply according to the principle of
proportionality.
The beneficiary concerned has 90 days from receiving notification to submit observations or to
propose a duly substantiated alternative flat-rate.
The Agency or the Commission may then start a reduction procedure in accordance with Article 27,
either on the basis of the alternative flat-rate or the flat-rate announced.
17.6 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, any insufficiently substantiated costs
will be ineligible (see Article 6) and will be rejected (see Article 26).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 18 — EVALUATION OF THE IMPACT OF THE ACTION
18.1 Right to evaluate the impact of the action
32
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
The Agency or the Commission may carry out interim and final evaluations of the impact of the action
measured against the objective of the EU programme.
Evaluations may be started during implementation of the action and up to five years after the
payment of the balance. The evaluation is considered to start on the date of the formal notification
to the coordinator or beneficiaries.
The Agency or the Commission may make these evaluations directly (using its own staff) or indirectly
(using external bodies or persons it has authorised to do so).
The coordinator or beneficiaries must provide any information relevant to evaluate the impact of the
action, including information in electronic format.
18.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the Agency may apply the measures
described in Chapter 6.
SECTION 3 OTHER RIGHTS AND OBLIGATIONS
ARTICLE 19 — PRE-EXISTING RIGHTS AND OWNERSHIP OF THE RESULTS
(INCLUDING INTELLECTUAL AND INDUSTRIAL PROPERTY
RIGHTS)
19.1 Pre-existing rights and access rights to pre-existing rights
Where industrial and intellectual property rights (including rights of third parties) exist prior to the
Agreement, the beneficiaries must establish a list of these pre-existing industrial and intellectual
property rights, specifying the owner and any persons that have a right of use.
The coordinator must — before starting the action — submit this list to the Agency.
Each beneficiary must give the other beneficiaries and their affiliated entities access to any pre-existing
industrial and intellectual property rights needed for the implementation of the action and compliance
with the obligations under the Agreement.
19.2 Ownership of results and rights of use
The results of the action (including the reports and other documents relating to it) are owned by the
beneficiaries.
The beneficiaries must give the Agency and the Commission the right to use the results for their
communication activities under Article 22.
19.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
Such a breach may also lead to any of the other measures described in Chapter 6.
33
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
ARTICLE 20 — CONFLICT OF INTERESTS
20.1 Obligation to avoid a conflict of interests
The beneficiaries must take all measures to prevent any situation where the impartial and objective
implementation of the action is compromised for reasons involving economic interest, political or
national affinity, family or emotional ties or any other shared interest (‘conflict of interests’).
They must formally notify to the Agency without delay any situation constituting or likely to lead to
a conflict of interests and immediately take all the necessary steps to rectify this situation.
The Agency may verify that the measures taken are appropriate and may require additional measures
to be taken by a specified deadline.
20.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27) and the Agreement or participation of the beneficiary may be terminated (see Article 34).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 21 — CONFIDENTIALITY
21.1 General obligation to maintain confidentiality
During implementation of the action and for five years after the payment of the balance, the parties
must keep confidential any data, documents or other material (in any form) that is identified as
confidential at the time it is disclosed (‘confidential information’).
They may use confidential information to implement the Agreement.
The confidentiality obligations no longer apply if:
(a) the disclosing party agrees to release the other party;
(b) the information becomes generally and publicly available, without breaching any
confidentiality obligation;
(c) the disclosure of the confidential information is required by EU or national law.
21.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 22 — PROMOTING THE ACTION — VISIBILITY OF EU FUNDING
22.1 Communication activities by the beneficiaries
22.1.1 General obligation to promote the action and its results
34
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
The beneficiaries must promote the action and its results.
22.1.2 Information on EU funding — Obligation and right to use the EU emblem
Unless the Agency requests or agrees otherwise, any communication activity related to the action
(including at conferences, seminars, in information material, such as brochures, leaflets, posters,
presentations, etc., in electronic form, via social media, etc.) and any infrastructure, equipment or
major results funded by the grant must:
- display the EU emblem and
- include the following text:
“This [insert appropriate description, e.g. report, publication, conference, infrastructure, equipment, insert
type of result, etc.] was funded by the European Union’s Health Programme (2014-2020).”
When displayed in association with another logo, the EU emblem must have appropriate prominence.
For the purposes of their obligations under this Article, the beneficiaries may use the EU emblem
without first obtaining approval from the Agency.
This does not, however, give them the right to exclusive use.
Moreover, they may not appropriate the EU emblem or any similar trademark or logo, either by
registration or by any other means.
22.1.3 Disclaimer excluding Agency and Commission responsibility
Any communication activity related to the action must indicate the following disclaimer:
"The content of this [insert appropriate description, e.g. report, publication, conference, etc.] represents
the views of the author only and is his/her sole responsibility; it cannot be considered to reflect the views
of the European Commission and/or the Consumers, Health, Agriculture and Food Executive Agency
(CHAFEA) or any other body of the European Union. The European Commission and the Agency do not
accept any responsibility for use that may be made of the information it contains.”
22.2 Communication activities by the Agency and the Commission
22.2.1 Right to use the beneficiaries’ materials, documents or information
The Agency and the Commission may use information relating to the action, documents notably
summaries for publication and public deliverables as well as any other material, such as pictures or
audio-visual material received from any beneficiary (including in electronic form).
This does not change the confidentiality obligations in Article 21, which still apply.
The right to use the beneficiary’s materials, documents and information includes:
(a) use for its own purposes (in particular, making them available to persons working for the
Agency, the Commission or any other EU institution, body, office or agency or body or
institutions in EU Member States; and copying or reproducing them in whole or in part, in
unlimited numbers);
(b) distribution to the public (in particular, publication as hard copies and in electronic or digital
format, publication on the internet, as a downloadable or non-downloadable file, broadcasting
35
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
by any channel, public display or presentation, communicating through press information
services, or inclusion in widely accessible databases or indexes);
(c) editing or redrafting for communication and publicising activities (including shortening,
summarising, inserting other elements (such as meta-data, legends, other graphic, visual, audio
or text elements), extracting parts (e.g. audio or video files), dividing into parts, use in a
compilation);
(d) translation;
(e) giving access in response to individual requests under Regulation No 1049/200110, without
the right to reproduce or exploit;
(f) storage in paper, electronic or other form;
(g) archiving, in line with applicable document-management rules, and
(h) the right to authorise third parties to act on its behalf or sub-license the modes of use set out
in Points (b), (c), (d) and (f) to third parties if needed for the communication and publicising
activities of the Agency or the Commission.
If the right of use is subject to rights of a third party (including personnel of the beneficiary), the
beneficiary must ensure that it complies with its obligations under this Agreement (in particular, by
obtaining the necessary approval from the third parties concerned).
Where applicable (and if provided by the beneficiaries), the Agency or the Commission will insert
the following information:
“© – [year] – [name of the copyright owner]. All rights reserved. Licensed to the Consumers, Health,
Agriculture and Food Executive Agency (CHAFEA) and the European Union (EU) under conditions.”
22.3 Consequences of non-compliance
If the beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 23 — PROCESSING OF PERSONAL DATA
23.1 Processing of personal data by the Agency and the Commission
Any personal data under the Agreement will be processed by the Agency or the Commission under
Regulation No 23/200111 and according to the ‘notifications of the processing operations’ to the Data
Protection Officer (DPO) of the Agency or the Commission (publicly accessible in the DPO register).
Such data will be processed by the ‘data controller’ of the Agency or the Commission, for the
10 Regulation (EC) No 1049/2001 of the European Parliament and of the Council of 30 May 2001 regarding public access
to European Parliament, Council and Commission documents, OJ L 145, 31.5.2001, p. 43.
11 Regulation (EC) No 45/2001 of the European Parliament and of the Council of 18 December 2000 on the protection
of individuals with regard to the processing of personal data by the Community institutions and bodies and on the free
movement of such data (OJ L 8, 12.01.2001, p. 1).
36
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
purposes of implementing, managing and monitoring the Agreement or protecting the financial
interests of the EU or Euratom (including checks, reviews, audits and investigations; see Article 17).
The persons whose personal data are processed have the right to access and correct their own personal
data. For this purpose, they must send any queries about the processing of their personal data to the data
controller, via the contact point indicated in the privacy statement(s) on the Agency and Commission
websites.
They also have the right to have recourse at any time to the European Data Protection Supervisor
(EDPS).
23.2 Processing of personal data by the beneficiaries
The beneficiaries must process personal data under the Agreement in compliance with applicable EU
and national law on data protection (including authorisations or notification requirements).
The beneficiaries may grant their personnel access only to data that is strictly necessary for
implementing, managing and monitoring the Agreement.
The beneficiaries must inform the personnel whose personal data are collected and processed by the
Agency or the Commission. For this purpose, they must provide them with the privacy statement(s)
(see above), before transmitting their data to the Agency or the Commission.
23.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under Article 23.2, the Agency may apply any of the
measures described in Chapter 6.
ARTICLE 24 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE AGENCY
The beneficiaries may not assign any of their claims for payment against the Agency to any third
party, except if approved by the Agency on the basis of a reasoned, written request by the coordinator
(on behalf of the beneficiary concerned).
If the Agency has not accepted the assignment or the terms of it are not observed, the assignment
will have no effect on it.
In no circumstances will an assignment release the beneficiaries from their obligations towards the
Agency.
CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES
ARTICLE 25 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES
25.1 Roles and responsibilities towards the Agency
The beneficiaries have full responsibility for implementing the action and complying with the
Agreement.
The beneficiaries are jointly and severally liable for the technical implementation of the action as
37
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
described in Annex 1. If a beneficiary fails to implement its part of the action, the other beneficiaries
become responsible for implementing this part (without being entitled to any additional EU funding
for doing so), unless the Agency expressly relieves them of this obligation.
The financial responsibility of each beneficiary is governed by Articles 28, 29 and 30.
25.2 Internal division of roles and responsibilities
The internal roles and responsibilities of the beneficiaries are divided as follows:
(a) Each beneficiary must:
(i) keep information stored in the Participant Portal Beneficiary Register (via the electronic
exchange system) up to date (see Article 12);
(ii) inform the coordinator immediately of any events or circumstances likely to affect
significantly or delay the implementation of the action (see Article 12);
(iii) submit to the coordinator in good time:
- individual financial statements for itself and its affiliated entities and, if required,
certificates on the financial statements (see Article 15);
- the data needed to draw up the technical reports (see Article 15);
- any other documents or information required by the Agency or the Commission
under the Agreement, unless the Agreement requires the beneficiary to submit this
information directly.
(b) The coordinator must:
(i) monitor that the action is implemented properly (see Article 7);
(ii) act as the intermediary for all communications between the beneficiaries and the Agency
(in particular, providing the Agency with the information described in Article 12), unless
the Agreement specifies otherwise;
(iii) provide a pre-financing guarantee if requested by the Agency (see Article 16.2);
(iv) request and review any documents or information required by the Agency and verify
their completeness and correctness before passing them on to the Agency;
(v) submit the deliverables and reports to the Agency (see Articles 14 and 15);
(vi) ensure that all payments are made to the other beneficiaries without unjustified delay
(see Article 16).
The coordinator may not subcontract the above-mentioned tasks.
25.3 Internal arrangements between beneficiaries — Consortium agreement
The beneficiaries must have internal arrangements regarding their operation and co-ordination to
38
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
ensure that the action is implemented properly. These internal arrangements must be set out in a written
‘consortium agreement’ between the beneficiaries, which may cover:
- internal organisation of the consortium;
- management of access to the electronic exchange system;
- distribution of EU funding;
- additional rules on rights and obligations related to pre-existing rights and results (see
Article 19);
- settlement of internal disputes;
- liability, indemnification and confidentiality arrangements between the beneficiaries.
The consortium agreement must not contain any provision contrary to the Agreement.
CHAPTER 6 REJECTION OF COSTS — REDUCTION OF THE GRANT —
RECOVERY — SANCTIONS — DAMAGES — SUSPENSION —
TERMINATION — FORCE MAJEURE
SECTION 1 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY
— SANCTIONS
ARTICLE 26 — REJECTION OF INELIGIBLE COSTS
26.1 Conditions
The Agency will — at the time of an interim payment, at the payment of the balance or afterwards
— reject any costs which are ineligible (see Article 6), in particular following checks, reviews, audits
or investigations (see Article 17).
The rejection may also be based on the extension of findings from other grants to this grant (see
Article 17.5.2).
26.2 Ineligible costs to be rejected — Calculation — Procedure
Ineligible costs will be rejected in full.
If the rejection of costs does not lead to a recovery (see Article 28), the Agency will formally notify
the coordinator or beneficiary concerned of the rejection of costs, the amounts and the reasons why
(if applicable, together with the notification of amounts due; see Article 16.5). The coordinator or
beneficiary concerned may — within 30 days of receiving notification — formally notify the Agency
of its disagreement and the reasons why.
If the rejection of costs leads to a recovery, the Agency will follow the contradictory procedure with
pre-information letter set out in Article 28.
26.3 Effects
39
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
If the Agency rejects costs at the time of an interim payment or the payment of the balance, it will
deduct them from the total eligible costs declared, for the action, in the periodic or final summary
financial statement (see Article 15.3 and 15.4). It will then calculate the interim payment or payment
of the balance as set out in Article 16.3 or 16.4.
If the Agency — after an interim payment but before the payment of the balance — rejects costs
declared in a periodic summary financial statement, it will deduct them from the costs declared in the
next periodic summary financial statement or final summary financial statement. It will then calculate
the interim payment or payment of the balance as set out in Article 16.3 or 16.4.
If the Agency rejects costs after the payment of the balance, it will deduct the amount rejected from
the total eligible costs declared, by the beneficiary, in the final summary financial statement. It will
then calculate the revised final grant amount as set out in Article 5.4. If the revised final grant amount
is lower than the final grant amount, the Agency will recover the difference (see Article 28).
ARTICLE 27 — REDUCTION OF THE GRANT
27.1 Conditions
The Agency may — at the payment of the balance or afterwards — reduce the grant, if:
(a) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under the Agreement or during the award procedure
(including improper implementation of the action, submission of false information,
failure to provide required information, breach of ethical principles) or
(b) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed — in other EU or Euratom grants awarded to it under similar conditions —
systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a
material impact on this grant (extension of findings from other grants to this grant; see
Article 17.5.2).
27.2 Amount to be reduced — Calculation — Procedure
The amount of the reduction will be proportionate to the seriousness of the errors, irregularities or
fraud or breach of obligations.
Before reduction of the grant, the Agency will formally notify a ‘pre-information letter’ to the
coordinator or beneficiary concerned:
- informing it of its intention to reduce the grant, the amount it intends to reduce and the reasons
why and
- inviting it to submit observations within 30 days of receiving notification.
If the Agency does not receive any observations or decides to pursue reduction despite the observations
it has received, it will formally notify confirmation of the reduction (if applicable, together with the
notification of amounts due; see Article 16).
40
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
27.3 Effects
If the Agency reduces the grant at the time of the payment of the balance, it will calculate the
reduced grant amount for the action and then determine the amount due as payment of the balance
(see Article 5.3.4 and 16.4).
If the Agency reduces the grant after the payment of the balance, it will calculate the revised final
grant amount for the action or for the beneficiary concerned (see Article 5.4). If the revised final grant
amount is lower than the final grant amount, the Agency will recover the difference (see Article 28).
ARTICLE 28 — RECOVERY OF UNDUE AMOUNTS
28.1 Amount to be recovered — Calculation — Procedure
The Agency will — at the payment of the balance or afterwards — claim back any amount that
was paid but is not due under the Agreement.
The coordinator is fully liable for repaying debts of the consortium (under the Agreement) even if it
has not been the final recipient of those amounts.
In addition, the beneficiaries (including the coordinator) are jointly and severally liable for repaying
any unpaid debts under the Agreement (due by the consortium or any beneficiary, including late-
payment interest) — up to the maximum EU contribution indicated, for each beneficiary, in the
estimated budget (as last amended; see Annex 2).
Undue amounts paid by the Agency for costs declared by an affiliated entity will be considered as
amounts unduly paid to the beneficiary.
28.1.1 Recovery at payment of the balance
If the payment of the balance takes the form of a recovery (see Article 16.4), the Agency will formally
notify a ‘pre-information letter’ to the coordinator:
- informing it of its intention to recover, the amount due as the balance and the reasons why and
- inviting the coordinator to submit observations within 30 days of receiving notification.
If no observations are submitted or the Agency decides to pursue recovery despite the observations
it has received, it will confirm the amount to be recovered and formally notify to the coordinator a
debit note with the terms and the date for payment (together with the notification of amounts due;
see Article 16.5).
If payment is not made by the date specified in the debit note, the Agency or the Commission will
recover the amount:
(a) by ‘offsetting’ it — without the coordinator’s consent — against any amounts owed to the
coordinator by the Agency, Commission or another executive agency (from the EU or Euratom
budget).
In exceptional circumstances, to safeguard the EU’s financial interests, the Agency may offset
before the payment date specified in the debit note;
41
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
(b) not applicable;
(c) by holding the other beneficiaries jointly and severally liable — up to the maximum EU
contribution indicated, for each beneficiary, in the estimated budget (as last amended; see
Annex 2)
(d) by taking legal action (see Article 41) or by adopting an enforceable decision under
Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the
Financial Regulation No 966/2012.
If payment is not made by the date in the debit note, the amount to be recovered (see above) will be
increased by late-payment interest at the rate set out in Article 16.11, from the day following the
payment date in the debit note, up to and including the date the Agency or the Commission receives
full payment of the amount.
Partial payments will be first credited against expenses, charges and late-payment interest and then
against the principal.
Bank charges incurred in the recovery process will be borne by the beneficiary, unless Directive
2007/64/EC applies.
28.1.2 Recovery of amounts after payment of the balance
If — after the payment of the balance — the Agency revised the final grant amount for the action or
for the beneficiary concerned (see Article 5.4), due to a rejection of costs or reduction of the grant, and
the revised final grant amount is lower than the final grant amount (see Article 5.3), the Agency will:
- if the rejection or reduction does not concern a specific beneficiary or its affiliated entities:
claim back the difference from the coordinator (even if it has not been the final recipient of
the amount in question)
or
- otherwise: claim back the difference from the beneficiary concerned.
The Agency will formally notify a pre-information letter to the coordinator or beneficiary concerned:
- informing it of its intention to recover, the amount to be repaid and the reasons why and
- inviting it to submit observations within 30 days of receiving notification.
If no observations are submitted or the Agency decides to pursue recovery despite the observations
it has received, it will confirm the amount to be recovered and formally notify to the coordinator or
beneficiary concerned a debit note. This note will also specify the terms and the date for payment.
If payment is not made by the date specified in the debit note, the Agency or the Commission will
recover the amount:
(a) by ‘offsetting’ it — without the coordinator’s or beneficiary’s consent — against any amounts
owed to the coordinator or beneficiary by the Agency, Commission or another executive agency
(from the EU or Euratom budget).
42
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
In exceptional circumstances, to safeguard the EU’s financial interests, the Agency may offset
before the payment date specified in the debit note;
(b) by holding the other beneficiaries jointly and severally liable, up to the maximum EU
contribution indicated, for each beneficiary, in the estimated budget (as last amended; see
Annex 2)
(c) by taking legal action (see Article 41) or by adopting an enforceable decision under
Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the
Financial Regulation No 966/2012.
If payment is not made by the date in the debit note, the amount to be recovered (see above) will be
increased by late-payment interest at the rate set out in Article 16.11, from the day following the date
for payment in the debit note, up to and including the date the Agency or the Commission receives
full payment of the amount.
Partial payments will be first credited against expenses, charges and late-payment interest and then
against the principal.
Bank charges incurred in the recovery process will be borne by the beneficiary, unless Directive
2007/64/EC applies.
ARTICLE 29 — ADMINISTRATIVE SANCTIONS
In addition to contractual measures, the Agency or the Commission may also adopt administrative
sanctions under Articles 106 and 131(4) of the Financial Regulation No 966/2012 (i.e. exclusion from
future procurement contracts, grants and expert contracts and/or financial penalties).
SECTION 2 LIABILITY FOR DAMAGES
ARTICLE 30 — LIABILITY FOR DAMAGES
30.1 Liability of the Agency
The Agency cannot be held liable for any damage caused to the beneficiaries or to third parties as a
consequence of implementing the Agreement, including for gross negligence.
The Agency cannot be held liable for any damage caused by any of the beneficiaries or third parties
involved in the action, as a consequence of implementing the Agreement.
30.2 Liability of the beneficiaries
Except in case of force majeure (see Article 35), the beneficiaries must compensate the Agency for
any damage it sustains as a result of the implementation of the action or because the action was not
implemented in full compliance with the Agreement.
SECTION 3 SUSPENSION AND TERMINATION
ARTICLE 31 — SUSPENSION OF PAYMENT DEADLINE
43
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
31.1 Conditions
The Agency may — at any moment — suspend the payment deadline (see Article 16.2 to 16.4) if a
request for payment (see Article 15) cannot be approved because:
(a) it does not comply with the provisions of the Agreement (see Article 15);
(b) the technical or financial report(s) have not been submitted or are not complete or additional
information is needed, or
(c) there is doubt about the eligibility of the costs declared in the financial statements and additional
checks, reviews, audits or investigations are necessary.
31.2 Procedure
The Agency will formally notify the coordinator of the suspension and the reasons why.
The suspension will take effect the day notification is sent by the Agency (see Article 36).
If the conditions for suspending the payment deadline are no longer met, the suspension will be lifted
— and the remaining period will resume.
If the suspension exceeds two months, the coordinator may request the Agency if the suspension will
continue.
If the payment deadline has been suspended due to the non-compliance of the technical or financial
report(s) (see Article 15) and the revised report or statement is not submitted or was submitted but
is also rejected, the Agency may also terminate the Agreement or the participation of the beneficiary
(see Article 34.3.1(i)).
ARTICLE 32 — SUSPENSION OF PAYMENTS
32.1 Conditions
The Agency may — at any moment — suspend payments, in whole or in part for one or more
beneficiaries, if:
(a) a beneficiary (or a natural person who has the power to represent or take decision on its behalf)
has committed or is suspected of having committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during the award procedure
(including improper implementation of the action, submission of false information,
failure to provide required information, breach of ethical principles) or
(b) a beneficiary (or a natural person who has the power to represent or take decision on its behalf)
has committed — in other EU or Euratom grants awarded to it under similar conditions —
systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a
material impact on this grant (extension of findings from other grants to this grant; see
Article 17.5.2).
44
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
If payments are suspended for one or more beneficiaries, the Agency will make partial payment(s)
for the part(s) not suspended. If suspension concerns the payment of the balance, the payment (or
recovery) of the amount(s) concerned after suspension is lifted will be considered to be the payment
that closes the action.
32.2 Procedure
Before suspending payments, the Agency will formally notify the coordinator or beneficiary
concerned:
- informing it of its intention to suspend payments and the reasons why and
- inviting it to submit observations within 30 days of receiving notification.
If the Agency does not receive observations or decides to pursue the procedure despite the observations
it has received, it will formally notify confirmation of the suspension. Otherwise, it will formally
notify that the suspension procedure is not continued.
The suspension will take effect the day the confirmation notification is sent by the Agency.
If the conditions for resuming payments are met, the suspension will be lifted. The Agency will
formally notify the coordinator or beneficiary concerned.
During the suspension, the periodic report(s) for all reporting periods except the last one (see
Article 15.3) must not contain any individual financial statement(s) from the beneficiary concerned
and its affiliated entities. The coordinator must include them in the next periodic report after the
suspension is lifted or — if suspension is not lifted before the end of the action — in the last periodic
report.
The beneficiaries may suspend implementation of the action (see Article 33.1) or terminate the
Agreement or the participation of the beneficiary concerned (see Article 34.1 and 34.2).
ARTICLE 33 — SUSPENSION OF THE ACTION IMPLEMENTATION
33.1 Suspension of the action implementation, by the beneficiaries
33.1.1 Conditions
The beneficiaries may suspend implementation of the action or any part of it, if exceptional
circumstances — in particular force majeure (see Article 35) — make implementation impossible or
excessively difficult.
33.1.2 Procedure
The coordinator must immediately formally notify to the Agency the suspension (see Article 36),
stating:
- the reasons why and
- the expected date of resumption.
The suspension will take effect the day this notification is received by the Agency.
45
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
Once circumstances allow for implementation to resume, the coordinator must immediately formally
notify the Agency and request an amendment of the Agreement, to set the date on which the action
will be resumed, extend the duration of the action and make other changes necessary to adapt the action
to the new situation (see Article 39) — unless the Agreement or the participation of a beneficiary has
been terminated (see Article 34).
The suspension will be lifted with effect from the resumption date set out in the amendment. This
date may be before the date on which the amendment enters into force.
Costs incurred during suspension of the action implementation are not eligible (see Article 6).
33.2 Suspension of the action implementation, by the Agency
33.2.1 Conditions
The Agency may suspend implementation of the action or any part of it, if:
(a) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed or is suspected of having committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during the award procedure
(including improper implementation of the action, submission of false declaration, failure
to provide required information, breach of ethical principles) or
(b) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed — in other EU or Euratom grants awarded to it under similar conditions —
systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a
material impact on this grant (extension of findings from other grants to this grant; see
Article 17.5.2).
33.2.2 Procedure
Before suspending implementation of the action, the Agency will formally notify the coordinator or
beneficiary concerned:
- informing it of its intention to suspend the implementation and the reasons why and
- inviting it to submit observations within 30 days of receiving notification.
If the Agency does not receive observations or decides to pursue the procedure despite the observations
it has received, it will formally notify confirmation of the suspension. Otherwise, it will formally
notify that the procedure is not continued.
The suspension will take effect five days after confirmation notification is received (or on a later date
specified in the notification).
It will be lifted if the conditions for resuming implementation of the action are met.
The coordinator or beneficiary concerned will be formally notified of the lifting and the Agreement
will be amended, to set the date on which the action will be resumed, extend the duration of the action
46
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
and make other changes necessary to adapt the action to the new situation (see Article 39) — unless
the Agreement has already been terminated (see Article 34).
The suspension will be lifted with effect from the resumption date set out in the amendment. This date
may be before the date on which the amendment enters into force.
Costs incurred during suspension are not eligible (see Article 6).
The beneficiaries may not claim damages due to suspension by the Agency (see Article 30).
Suspension of the action implementation does not affect the Agency’s right to terminate the Agreement
or participation of a beneficiary (see Article 34), reduce the grant or recover amounts unduly paid
(see Articles 27 and 28).
ARTICLE 34 — TERMINATION OF THE AGREEMENT OR OF THE PARTICIPATION
OF ONE OR MORE BENEFICIARIES
34.1 Termination of the Agreement, by the beneficiaries
34.1.1 Conditions and procedure
The beneficiaries may terminate the Agreement.
The coordinator must formally notify termination to the Agency (see Article 36), stating:
- the reasons why and
- the date the termination will take effect. This date must be after the notification.
If no reasons are given or if the Agency considers the reasons do not justify termination, the Agreement
will be considered to have been ‘terminated improperly’.
The termination will take effect on the day specified in the notification.
34.1.2 Effects
The coordinator must — within 60 days from when termination takes effect — submit a periodic report
(for the open reporting period until termination; see Article 15.3) and the final report (see Article 15.4).
If the Agency does not receive the report(s) within the deadline (see above), only costs which are
included in an approved periodic report will be taken into account.
The Agency will calculate the final grant amount (see Article 5.3) and the balance (see Article 16.4)
on the basis of the report(s) submitted. Only costs incurred until termination are eligible (see Article 6).
Costs relating to contracts due for execution only after termination are not eligible.
Improper termination may lead to a reduction of the grant (see Article 27).
After termination, the beneficiaries’ obligations (in particular, Articles 15, 17, 18, 19, 20, 21, 22, 24,
26, 27 and 28) continue to apply.
34.2 Termination of the participation of one or more beneficiaries, by the beneficiaries
47
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
34.2.1 Conditions and procedure
The participation of one or more beneficiaries may be terminated by the coordinator, on request of
the beneficiary concerned or on behalf of the other beneficiaries.
The coordinator must formally notify termination to the Agency (see Article 36) and inform the
beneficiary concerned.
If the coordinator’s participation is terminated without its agreement, the formal notification must be
done by another beneficiary (acting on behalf of the other beneficiaries).
The notification must include:
- the reasons why;
- the opinion of the beneficiary concerned (or proof that this opinion has been requested in
writing);
- the date the termination takes effect. This date must be after the notification, and
- a request for amendment (see Article 39), with a proposal for reallocation of the tasks and the
estimated budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the
addition of one or more new beneficiaries (see Article 40). If termination takes effect after the
period set out in Article 3, no request for amendment must be included, unless the beneficiary
concerned is the coordinator. In this case, the request for amendment must propose a new
coordinator.
If this information is not given or if the Agency considers that the reasons do not justify termination,
the participation will be considered to have been terminated improperly.
The termination will take effect on the day specified in the notification.
34.2.2 Effects
The beneficiary concerned must submit to the coordinator:
(i) a technical report and
(ii) a financial statement covering the period from the end of the last reporting period to the date
when termination takes effect.
This information must be included by the coordinator in the periodic report for the next reporting
period (see Article 15.3).
If the request for amendment is rejected by the Agency (because it calls into question the decision
awarding the grant or breaches the principle of equal treatment of applicants), the Agreement may be
terminated according to Article 34.3.1(c).
If the request for amendment is accepted by the Agency, the Agreement is amended to introduce the
necessary changes (see Article 39).
Improper termination may lead to a reduction of the grant (see Article 27) or termination of the
Agreement (see Article 34).
48
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
After termination, the concerned beneficiary’s obligations (in particular Articles 15, 17, 18, 19, 21,
22, 24, 26, 27 and 28) continue to apply.
34.3 Termination of the Agreement or of the participation of one or more beneficiaries, by
the Agency
34.3.1 Conditions
The Agency may terminate the Agreement or the participation of one or more beneficiaries, if:
(a) one or more beneficiaries do not accede to the Agreement (see Article 40);
(b) a change to their legal, financial, technical, organisational or ownership situation (or those of
its affiliated entities) is likely to substantially affect or delay the implementation of the action
or calls into question the decision to award the grant;
(c) following termination of participation for one or more beneficiaries (see above), the necessary
changes to the Agreement would call into question the decision awarding the grant or breach
the principle of equal treatment of applicants (see Article 39);
(d) implementation of the action is prevented by force majeure (see Article 35) or suspended by
the coordinator (see Article 33.1) and either:
(i) resumption is impossible, or
(ii) the necessary changes to the Agreement would call into question the decision awarding
the grant or breach the principle of equal treatment of applicants;
(e) a beneficiary is declared bankrupt, being wound up, having its affairs administered by the
courts, has entered into an arrangement with creditors, has suspended business activities, or
is subject to any other similar proceedings or procedures under national law;
(f) a beneficiary (or a natural person who has the power to represent or take decisions on its
behalf) has been found guilty of professional misconduct, proven by any means;
(g) a beneficiary does not comply with the applicable national law on taxes and social security;
(h) a beneficiary (or a natural person who has the power to represent or take decisions on its
behalf) has committed fraud, corruption, or is involved in a criminal organisation, money
laundering or any other illegal activity;
(i) a beneficiary (or a natural person who has the power to represent or take decisions on its
behalf) has committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under the Agreement or during the award procedure
(including improper implementation of the action, submission of false information,
failure to provide required information, breach of ethical principles);
(j) a beneficiary (or a natural person who has the power to represent or take decisions on its
behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions
— systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have
49
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
a material impact on this grant (extension of findings from other grants to this grant; see
Article 17.5.2);
(k) despite a specific request by the Agency, a beneficiary does not request — through the
coordinator — an amendment to the Agreement to end the participation of one of its affiliated
entities that is in one of the situations under points (e), (f), (g), (h), (i) or (j) and to reallocate
its tasks
34.3.2 Procedure
Before terminating the Agreement or participation of one or more beneficiaries, the Agency will
formally notify the coordinator or beneficiary concerned:
- informing it of its intention to terminate and the reasons why and
- inviting it, within 30 days of receiving notification, to submit observations and — in case of
Point (i.ii) above — to inform the Agency of the measures to ensure compliance with the
obligations under the Agreement.
If the Agency does not receive observations or decides to pursue the procedure despite the observations
it has received, it will formally notify to the coordinator or beneficiary concerned confirmation of
the termination and the date it will take effect. Otherwise, it will formally notify that the procedure
is not continued.
The termination will take effect:
- for terminations under Points (b), (c), (e), (g), (i.ii) and (k) above: on the day specified in the
notification of the confirmation (see above);
- for terminations under Points (a), (d), (f), (h), (i.i) and (j) above: on the day after the notification
of the confirmation is received.
34.3.3 Effects
(a) for termination of the Agreement:
The coordinator must — within 60 days from when termination takes effect — submit a periodic
report (for the last open reporting period until termination; see Article 15.3) and a final report
(see Article 15.4).
If the Agreement is terminated for breach of the obligation to submit reports (see Articles 15.8
and 34.3.1(i)), the coordinator may not submit any reports after termination.
If the Agency does not receive the report(s) within the deadline (see above), only costs which
are included in an approved periodic report will be taken into account.
The Agency will calculate the final grant amount (see Article 5.3) and the balance (see
Article 16.4) on the basis of the report(s) submitted. Only costs incurred until termination
takes effect are eligible (see Article 6). Costs relating to contracts due for execution only after
termination are not eligible.
This does not affect the Agency’s right to reduce the grant (see Article 27) or to impose
administrative sanctions (Article 29).
50
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
The beneficiaries may not claim damages due to termination by the Agency (see Article 30).
After termination, the beneficiaries’ obligations (in particular Articles 15, 17, 18, 19, 21, 22,
24, 26, 27 and 28) continue to apply.
(b) for termination of the participation of one or more beneficiaries:
The coordinator must — within 60 days from when termination takes effect — submit a request
for amendment (see Article 39), with a proposal for reallocation of the tasks and estimated
budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the addition of
one or more new beneficiaries (see Article 40). If termination is notified after the period set out
in Article 3, no request for amendment must be submitted unless the beneficiary concerned is
the coordinator. In this case the request for amendment must propose a new coordinator.
The beneficiary concerned must submit to the coordinator:
(i) a technical report and
(ii) a financial statement covering the period from the end of the last reporting period to the
date when termination takes effect.
This information must be included by the coordinator in periodic report for the next reporting
period (see Article 15.3).
If the request for amendment is rejected by the Agency (because it calls into question the
decision awarding the grant or breaches the principle of equal treatment of applicants), the
Agreement may be terminated according to Article 34.3.1(c).
If the request for amendment is accepted by the Agency, the Agreement is amended to
introduce the necessary changes (see Article 39).
After termination, the concerned beneficiary’s obligations (in particular Articles 15, 17, 18, 19,
20, 21, 22, 24, 26, 27 and 28) continue to apply.
SECTION 4 FORCE MAJEURE
ARTICLE 35 — FORCE MAJEURE
‘Force majeure’ means any situation or event that:
- prevents either party from fulfilling their obligations under the Agreement,
- was unforeseeable, exceptional situation and beyond the parties’ control,
- was not due to error or negligence on their part (or on the part of third parties involved in the
action), and
- proves to be inevitable in spite of exercising all due diligence.
The following cannot be invoked as force majeure:
51
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
- any default of a service, defect in equipment or material or delays in making them available,
unless they stem directly from a relevant case of force majeure,
- labour disputes or strikes, or
- financial difficulties.
Any situation constituting force majeure must be formally notified to the other party without delay,
stating the nature, likely duration and foreseeable effects.
The parties must immediately take all the necessary steps to limit any damage due to force majeure
and do their best to resume implementation of the action as soon as possible.
The party prevented by force majeure from fulfilling its obligations under the Agreement cannot be
considered in breach of them.
CHAPTER 7 FINAL PROVISIONS
ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES
36.1 Form and means of communication
Communication under the Agreement (information, requests, submissions, 'formal notifications', etc.)
must:
- be made in writing and
- bear the number of the Agreement.
Until the payment of the balance: all communication must be made through the electronic exchange
system and using the forms and templates provided there.
After the payment of the balance: formal notifications must be made by registered post with proof
of delivery (‘formal notification on paper’).
Communications in the electronic exchange system must be made by persons authorised according to
the Participant Portal Terms & Conditions. For naming the authorised persons, each beneficiary must
have designated — before the signature of this Agreement — a ‘legal entity appointed representative
(LEAR)’. The role and tasks of the LEAR are stipulated in his/her appointment letter (see Participant
Portal Terms & Conditions).
If the electronic exchange system is temporarily unavailable, instructions will be given on the Agency
and Commission websites.
36.2 Date of communication
Communications are considered to have been made when they are sent by the sending party (i.e. on
the date and time they are sent through the electronic exchange system).
Formal notifications through the electronic exchange system are considered to have been made when
they are received by the receiving party (i.e. on the date and time of acceptance by the receiving party,
52
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
as indicated by the time stamp). A formal notification that has not been accepted within 10 days after
sending is considered to have been accepted.
Formal notifications on paper sent by registered post with proof of delivery (only after the payment
of the balance) are considered to have been made on either:
- the delivery date registered by the postal service or
- the deadline for collection at the post office.
If the electronic exchange system is temporarily unavailable, the sending party cannot be considered
in breach of its obligation to send a communication within a specified deadline.
36.3 Addresses for communication
The electronic exchange system must be accessed via the following URL:
https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/myarea/projects
The Agency will formally notify the coordinator and beneficiaries in advance any changes to this URL.
Formal notifications on paper (only after the payment of the balance) addressed to the Agency must
be sent to the following address:
Consumers, Health, Agriculture and Food Executive Agency (CHAFEA)
Health and Food Safety Unit Health and Food Safety Unit
Drosbach Building
L-2920 Luxembourg
Formal notifications on paper (only after the payment of the balance) addressed to the beneficiaries
must be sent to their legal address as specified in the Participant Portal Beneficiary Register.
ARTICLE 37 — INTERPRETATION OF THE AGREEMENT
37.1 Precedence of the Terms and Conditions over the Annexes
The provisions in the Terms and Conditions of the Agreement take precedence over its Annexes.
Annex 2 takes precedence over Annex 1.
37.2 Privileges and immunities
Not applicable
ARTICLE 38 — CALCULATION OF PERIODS, DATES AND DEADLINES
In accordance with Regulation No 1182/7112, periods expressed in days, months or years are calculated
from the moment the triggering event occurs.
12 Regulation (EEC, Euratom) No 1182/71 of the Council of 3 June 1971 determining the rules applicable to periods, dates
and time-limits (OJ L 124, 8/6/1971, p. 1).
53
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
The day during which that event occurs is not considered as falling within the period.
ARTICLE 39 — AMENDMENTS TO THE AGREEMENT
39.1 Conditions
The Agreement may be amended, unless the amendment entails changes to the Agreement which
would call into question the decision awarding the grant or breach the principle of equal treatment
of applicants.
Amendments may be requested by any of the parties.
39.2 Procedure
The party requesting an amendment must submit a request for amendment signed in the electronic
exchange system (see Article 36).
The coordinator submits and receives requests for amendment on behalf of the beneficiaries (see
Annex 3).
If a change of coordinator is requested without its agreement, the submission must be done by another
beneficiary (acting on behalf of the other beneficiaries).
The request for amendment must include:
- the reasons why;
- the appropriate supporting documents, and
- for a change of coordinator without its agreement: the opinion of the coordinator (or proof that
this opinion has been requested in writing).
The Agency may request additional information.
If the party receiving the request agrees, it must sign the amendment in the electronic exchange system
within 45 days of receiving notification (or any additional information the Agency has requested). If
it does not agree, it must formally notify its disagreement within the same deadline. The deadline may
be extended, if necessary for the assessment of the request. If no notification is received within the
deadline, the request is considered to have been rejected.
An amendment enters into force on the day of the signature of the receiving party.
An amendment takes effect on the date agreed by the parties or, in the absence of such an agreement,
on the date on which the amendment enters into force.
ARTICLE 40 — ACCESSION TO THE AGREEMENT
40.1 Accession of the beneficiaries mentioned in the preamble
The other beneficiaries must accede to the Agreement by signing the Accession Form (see Annex 3) in
the electronic exchange system (see Article 36) within 30 days after its entry into force (see Article 42).
54
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
They will assume the rights and obligations under the Agreement with effect from the date of its entry
into force (see Article 42).
If a beneficiary does not accede to the Agreement within the above deadline, the coordinator must
— within 30 days — request an amendment to make any changes necessary to ensure proper
implementation of the action. This does not affect the Agency's right to terminate the Agreement (see
Article 34).
40.2 Addition of new beneficiaries
In justified cases, the beneficiaries may request the addition of a new beneficiary.
For this purpose, the coordinator must submit a request for amendment in accordance with Article 39.
It must include an Accession Form (see Annex 3) signed by the new beneficiary in the electronic
exchange system (see Article 36).
New beneficiaries must assume the rights and obligations under the Agreement with effect from the
date of their accession specified in the Accession Form (see Annex 3).
ARTICLE 41 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES
41.1 Applicable law
The Agreement is governed by the applicable EU law, supplemented if necessary by the law of
Belgium.
41.2 Dispute settlement
If a dispute concerning the interpretation, application or validity of the Agreement cannot be settled
amicably, the General Court — or, on appeal, the Court of Justice of the European Union — has sole
jurisdiction. Such actions must be brought under Article 272 of the Treaty on the Functioning of the
EU (TFEU).
As an exception, if such a dispute is between the Agency and ‘MINISTRY OF CIVIL AFFAIRS’,
‘INSTITUT ZA ZASTITU ZDRAVLJA SRBIJEDR MILAN JOVANOVIC BATUT’, the competent
Belgian courts have sole jurisdiction.
If a dispute concerns administrative sanctions, offsetting or an enforceable decision under
Article 79(2) of the Financial Regulation No 966/2012 and Article 299 TFEU (see Articles 28, 29 and
30), the beneficiaries must bring action before the General Court — or, on appeal, the Court of Justice
of the European Union — under Article 263 TFEU. Actions against enforceable decisions must be
brought against the Commission (not against the Agency).
55
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
Associated with documentCHAFEA MGA — Multi:-v2.1
Ref. Ares(2020)4587976 03/09/2020
ARTICLE 42 — ENTRY INTO FORCE OF THE AGREEMENT
The Agreement will enter into force on the day of signature by the Agency or the coordinator,
depending on which is later.
SIGNATURES
For the coordinator For the Agency
[--TGSMark#signature-948891346_75_210--] [--TGSMark#signature-service_75_210--]
Milan Krek with ECAS id n003bif0 signed in the Participant Portal Signed by Veronique WASBAUER with ECAS id wasbave as an
on 04/09/2020 at 14:04:57 (transaction id SigId-20817-eJ57YpAYd authorised representative on 04-09-2020 16:07:01 (transaction id
3ot2BzZrfgExmzc5Bzl7ZdWnTKuzzqSJaKvKAtzJNPtfzIIVRbCkiEkBv SigId-21748-73Kmlf5Mzml5AB2gY9E2bGOWYbx80nPDZJQCultxtUQ9
aDFrzJyDzZUJ4aNjtMQhUsm-rS0vSrmBGYC8zfwLQLD1Ks-C88T5u nHTzo6RfsRCwcuPUQcLggJcaitmhiIiizPLPTsvm2zK-
lb30gzI4PWstva46BbUrMvHcsISoESJNE9jFWlDzzW3dZinQpKYFXX rS0vSrmBGYC8zfwLQLD1Ks-rTHzwUokxy8X52XB5oqgABzg3nQJQssbf
J2PleuCwtreiphzoVcYJb1UqzRt). Timestamp by third party at xM1DmcBkZJN2zYhq9b3CuL0stckkFztwbyIpWasOEnQPFkXNOj4evG)
2020.09.04 15:05:03 CEST 2020.09.04 16:07:06 CEST
56
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
EUROPEAN COMMISSION
Consumers, Health, Agriculture and Food Executive Agency
(CHAFEA)
The Director
ANNEX 1 (part A)
Project
NUMBER — 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Table of Contents
1.1. The project summary................................................................................................................................. 3
1.2. The list of beneficiaries..............................................................................................................................4
1.3. Workplan Tables - Detailed implementation..............................................................................................6
1.3.1. WT1 List of work packages........................................................................................................... 6
1.3.2. WT2 List of deliverables................................................................................................................ 7
1.3.3. WT3 Work package descriptions................................................................................................. 10
Work package 1......................................................................................................................... 10
Work package 2......................................................................................................................... 14
Work package 3......................................................................................................................... 20
Work package 4......................................................................................................................... 23
Work package 5......................................................................................................................... 28
Work package 6......................................................................................................................... 33
Work package 7......................................................................................................................... 39
1.3.4. WT4 List of milestones................................................................................................................ 44
1.3.5. WT5 Critical Implementation risks and mitigation actions........................................................... 47
1.3.6 WT6 Summary of project effort in person-months........................................................................51
1.3.7. WT7 Tentative schedule of project reviews.................................................................................53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1.1. The project summary
Project Number 1 951202 Project Acronym 2 Best-ReMaP
One form per project
General information
Project title 3
Joint Action on Implementation of Validated Best Practices in Nutrition
Starting date 4 01/10/2020
Duration in months 5 36
Call (part) identifier 6 HP-JA-2019
JA-01-2019
Topic
Joint Action on implementation of validated best practices (in Nutrition)
Fixed EC Keywords
Food reformulation and monitoring, nutritional composition data, HFSS foods, food
Free keywords marketing exposure and power, digital marketing, AVMSD, food procurement in public
sector, food catalogue,menu quality
Abstract 7
The main focus of the Best-ReMaP Joint Action will be on adapting, replicating and implementing effective health
interventions, based on practices that have been proven to work in the areas of food reformulation, framing of food
marketing and public procurement of healthy food in public settings, thus contributing to increased offer of healthier
options of processed foods (by reducing salt, sugar and fat from the processed foods) available in EU (super)markets.
The JA will implement a European Standardised Monitoring system for the reformulation of processed foods. The JA
aims to deliver a harmonised EU approach to reducing unhealthy (digital) food marketing to children and adolescents
and to use already developed tools for harmonised monitoring of (digital) marketing. A prototype catalogue of food
will be tested in the public procurement procedure to contribute to the higher quality of menus by assuring transparent
quality of the procured foods within public institutions. Building on this work, the JA will support implementation,
transfer and integration of the results, outcomes and recommendations of the Best-ReMaP JA into national and EU-
level policies. Throughout the JA processes, the participatory engagement of EU and national stakeholders in the field
will be prioritised.
Page 3 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1.2. List of Beneficiaries
Project Number 1 951202 Project Acronym 2 Best-ReMaP
List of Beneficiaries
Project Project
No Name Short name Country entry exit
month8 month
NACIONALNI INSTITUT ZA JAVNO
1 NIJZ Slovenia 1 36
ZDRAVJE
BUNDESMINISTERIUM FUER ARBEIT,
2 SOZIALES, GESUNDHEIT UND BMASGK Austria 1 36
KONSUMENTENSCHUTZ
3 SCIENSANO SCIENSANO Belgium 1 36
Bosnia and
4 MINISTRY OF CIVIL AFFAIRS MCA 1 36
Herzegovina
NATSIONALEN CENTAR PO
5 NCPHA Bulgaria 1 36
OBSHTESTVENO ZDRAVE I ANALIZI
HRVATSKI ZAVOD ZA JAVNO
6 CIPH Croatia 1 36
ZDRAVSTVO
7 Ministry of Health of the Republic of Cyprus MoH CY Cyprus 1 36
8 FODEVARESTYRELSEN DVFA Denmark 1 36
9 SOTSIAALMINISTEERIUM MoSA Estonia 1 36
TERVEYDEN JA HYVINVOINNIN
10 THL Finland 1 36
LAITOS
AGENCE NATIONALE DE LA SECURITE
11 SANITAIRE DE L ALIMENTATION DE L ANSES France 1 36
ENVIRONNEMENT ET DU TRAVAIL
MAX RUBNER INSTITUT
12 BUNDESFORSCHUNGSINSTITUT FUR MRI Germany 1 36
ERNAEHRUNG UND LEBENSMITTEL
13 INSTITOUTON YGEIAS TOU PAIDIOU ICH Greece 1 36
14 SEMMELWEIS EGYETEM SU Hungary 1 36
15 DEPARTMENT OF HEALTH DoH Ireland 1 36
16 ISTITUTO SUPERIORE DI SANITA ISS Italy 1 36
SLIMIBU PROFILAKSES UN
17 CDPC Latvia 1 36
KONTROLES CENTRS
LIETUVOS RESPUBLIKOS SVEIKATOS
18 LR SAM Lithuania 1 36
APSAUGOS MINISTERIJA
19 Ministry for Health - Government of Malta MFH Malta 1 36
RIJKSINSTITUUT VOOR
20 RIVM Netherlands 1 36
VOLKSGEZONDHEID EN MILIEU
SLASKI UNIWERSYTET MEDYCZNY W
21 SUM Poland 1 36
KATOWICACH
MINISTERIO DA SAUDE - REPUBLICA
22 DGS Portugal 1 36
PORTUGUESA
Page 4 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1.2. List of Beneficiaries
Project Project
No Name Short name Country entry exit
month8 month
INSTITUTUL NATIONAL DE SANATATE
23 NIPH Romania 1 36
PUBLICA
INSTITUT ZA ZASTITU ZDRAVLJA
24 IPHS Serbia 1 36
SRBIJEDR MILAN JOVANOVIC BATUT
Page 5 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1.3. Workplan Tables - Detailed implementation
1.3.1. WT1 List of work packages
WP Person- Start End
WP Title Lead beneficiary10
Number9 months11 month12 month13
WP1 Coordination 1 - NIJZ 138.00 1 36
WP2 Dissemination 14 - SU 113.00 1 36
WP3 Evaluation 10 - THL 88.00 1 36
Sustainability and Integration in
WP4 16 - ISS 85.00 1 36
National Policies
EU Harmonised Reformulation and
WP5 11 - ANSES 426.50 1 36
processed food monitoring
Best practices in reducing marketing
WP6 of unhealthy food products to 15 - DoH 291.50 1 36
children and adolescents
Public procurement of food in public
WP7 1 - NIJZ 271.25 1 36
institutions –a pilot EU approach
Total 1 413.25
Page 6 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1.3.2. WT2 list of deliverables
Due
Deliverable WP Dissemination
Deliverable Title Lead beneficiary Type 15 Date (in
Number14 number9 level16
months)17
D1.1 Meeting minutes
D1.1 WP1 1 - NIJZ Report Public 12
of the PDMF meetings
D1.2 Meeting minutes
D1.2 WP1 1 - NIJZ Report Public 24
of the PDMF meetings
D1.3 Meeting minutes
D1.3 WP1 1 - NIJZ Report Public 36
of the PDMF meetings
MD.2.1 Introductory
D2.1 WP2 14 - SU Report Public 3
leaflet
Websites,
D2.2 MD.2.2 Website WP2 14 - SU patents Public 3
filling, etc.
D2.3 Dissemination
D2.3 WP2 14 - SU Report Public 4
strategy
MD2.4 Mid-term report
D2.4 WP2 14 - SU Report Public 18
on Dissemination
Websites,
D2.5 Promotional
D2.5 WP2 14 - SU patents Public 36
movies completed
filling, etc.
MD2.6 Layman version
D2.6 WP2 14 - SU Report Public 36
of the final report
MD2.7 Final report on
D2.7 WP2 14 - SU Report Public 36
Dissemination
D3.1 Evaluation
D3.1 WP3 10 - THL Report Public 5
strategy
MD2.3 Mid-term report
D3.2 WP3 10 - THL Report Public 18
on Evaluation
MD3.3 Final
D3.3 WP3 10 - THL Report Public 36
Evaluation report
D4.1 Documents
D4.1 retrieved in the desk WP4 16 - ISS Report Public 6
research
MD4.2 Integration
and sustainability
plan (Report on
D4.2 WP4 16 - ISS Report Public 36
sustainability and
integration in national
policies)
D4.3 Briefs of the four
D4.3 WP4 16 - ISS Report Public 36
policy dialogues
D5.1 Development of
the Guidelines for an
D5.1 WP5 11 - ANSES Report Public 9
European harmonised
and sustainable
Page 7 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Due
Deliverable WP Dissemination
Deliverable Title Lead beneficiary Type15 Date (in
Number14 number9 level16
months)17
monitoring system of
the processed food
supply, consultation/
temporary report
D5.2 Final Guidelines
for an European
harmonised and
D5.2 WP5 11 - ANSES Report Public 30
sustainable monitoring
system of the processed
food supply
D5.3 Report on
reformulation
monitoring: monitoring
implementation,
D5.3 WP5 11 - ANSES Report Public 36
reformulation
comparisons and
reformulation impacts
on nutrient intakes
D6.1 An EU
harmonised approach
using the WHO nutrient
D6.1 profile model for WP6 15 - DoH Report Public 9
the identification of
foods not permitted for
marketing to children
D6.2 Technical
D6.2 guidance for codes of WP6 15 - DoH Report Public 18
practice
D6.3 Report on Pilot
EU–wide harmonised
and comprehensive
monitoring protocol
D6.3 WP6 15 - DoH Report Public 32
for unhealthy food
marketing to children,
with a particular focus
on digital marketing
D6.4 A harmonised EU
Framework for Action
on reducing unhealthy
D6.4 WP6 15 - DoH Report Public 36
food marketing to
children, within the
scope of HLG-N&PA
D7.1 Overview/
applicative situation
D7.1 analyses of the existing WP7 1 - NIJZ Report Public 7
EU and national
legislation
D7.1 Knowledge
D7.2 WP7 1 - NIJZ Other Public 22
transfer training(s)
Page 8 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Due
Deliverable WP Dissemination
Deliverable Title Lead beneficiary Type15 Date (in
Number14 number9 level16
months)17
D7.3 Pilot Catalogue of
D7.3 WP7 1 - NIJZ Demonstrator Public 32
foods
D7.4 EU harmonised
D7.4 WP7 1 - NIJZ Report Public 36
Framework for Action
Page 9 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1.3.3. WT3 Work package descriptions
Work package number 9 WP1 Lead beneficiary 10 1 - NIJZ
Work package title Coordination
Start month 1 End month 36
Objectives
The main objective of the Coordination Work Package is to ensure that the Joint Action meets the stipulations set out in
the Grant Agreement with the Executive Agency, as well as the general and specific objectives set out in this proposal.
Detailed objectives include:
- To set up, manage and implement a Joint Action management structure with specific working groups and set up a
meeting structure for these groups (roles and responsibilities of working groups and a corresponding meeting schedule),
- To define and implement regular communications channels and methods with all WP Leaders and working groups in
order to assess the implementation of the JA and to identify any deviations in a timely manner,
- To set up, manage and implement the legal, financial and administrative management of the JA,
- To ensure the scientific coordination of the JA, including systematic monitoring of the appropriateness and
effectiveness of all planned activities, ensuring timely completion of JA deliverables, including monitoring of
deliverables/milestones, according to the work plan set out in Annex 1b of the GA and subsequent coordination
documents.
Description of work and role of partners
WP1 - Coordination [Months: 1-36]
NIJZ, BMASGK, SCIENSANO, MCA, NCPHA, CIPH, MoH CY, DVFA, MoSA, THL, ANSES, MRI, ICH, SU,
DoH, ISS, CDPC, LR SAM, MFH, RIVM, SUM, DGS, NIPH, IPHS
WP 1 will manage the Joint Action on a daily basis, ensuring that work on all WPs is progressing according to the
terms set out in the Grant Agreement. A detailed Project Policy will be produced at the beginning of the JA, to be
confirmed by the Steering Committee, describing all of the detailed working methods of the JA, including management
and tracking tools. The scope and remit of each working group will be defined in detail, along with a meeting schedule
and working methods for each working group. This Project Policy will form an integral annex to the Best-ReMaP
Consortium Agreement, ensuring that it is adhered to by all JA partners. The Project Policy will serve as a one-stop,
clear, easy to understand, yet comprehensive document for all the JA partners, setting out in operational terms the
working methods and means used which will be used to achieve the objectives set out in the Grant Agreement.
The below three tasks are a brief summary of the tasks which will be defined in depth within the Best-ReMaP Project
Policy and are as follows:
Task 1.1. Joint Action Management and Meeting Structure
Task Leader: NIJZ + All Associated Partners
The Management and Meeting Structure for the JA will consist of a:
• Project Management Team (PMT) as an internal working group of administrative, financial and scientific support
within NIJZ. The team will be comprised of the Scientific Coordinator, Project Manager, Financial Officer, Secretariat,
Communications Officer, Legal Officer and researchers. The team will meet face to face at least once per week to discuss
daily management issues. The PMT will act as liaison between all Associated Partners and CHAFEA. Key documents
to be produced include: Project Policy, Financial Policy, Consortium Agreement, Interim and Final Reports.
• Joint Action Steering Committee (SC) as the main oversight committee of the Joint Action. The SC will be comprised
of the WP Leaders, PMT, and representatives of the European Commission as observers. The SC will be supported by
academic experts from relevant scientific fields, such as agri-food chain, national level public food procurement, experts
with specific knowledge on child legislation, as well as experts on health inequalities. The SC will meet at least six
times during the course of the JA and will hold meetings back to back with other events where SC members are already
present. The objective of the SC will be to monitor the overall progress of the JA and accept action plans on specific
issues, where needed. The SC will discuss all issues, which bear on the implementation of the JA, both in the realm of
scientific issues as well as administrative issues. The SC will be regularly updated and consulted on: the progress of
the JA and its WPs, activities of the coordinator at policy level, synergies and activities carried out by the horizontal
WPs 1-4, timely preparation of interim and final reports, as well as regular updating on financial expenditure of the JA
by WPs and individual partners, where problematic. Since there is a wide remit of issues, both scientific and technical,
Page 10 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
within the scope of the SC working group, regular web conferences will be scheduled in order to discuss and resolve
current issues (web conferences once monthly or according to need).
• General Assembly (GA) meetings consisting of representatives of all Associated Partners and the PMT, with
Collaborating Partners and possibly other related projects and initiatives invited. The meetings will be held to discuss
progress on JA objectives with the entire Associated Partner consortium. Workshops on financial reporting will also
be part of specific meetings prior to the submission of the interim and final reports. Four GA meetings will be held
over the course of the JA.
• Policy decision making forum (PDMF) as a policy advisory board to the JA, consisting of the representatives of DG
Santé, DG-Agri, DG Connect, DG Research, DG JRC , other relevant DGs, representatives of EU Agencies and bodies
such as EFSA and ERGA, representatives of the EU Parliament, representatives of the current Presidencies, WP Leaders
will be informed on the JA progress and proposals of the institutionalised / legislative solutions. There are three PDMF
meetings planned within the JA. This forum will act in synergy with the horizontal WPs and particularly WPs 4-7. WP
1 will be responsible for coordinating and preparing the meeting documents for the PDMF. Depending on the nature
of the proposals, meeting documents and agenda topics, the PDMF will be asked to provide critical feedback on the
feasibility of implementation at national and EU level, with a view to the achievement of the Best-ReMaP outcome
indicators as set out in the GA. Policy briefs with EU stakeholders will be produced in order to capitalise on the work
of the PDMF and expedite implementation, this will be done in conjunction with WP 2 and 4 (responsible for Policy
briefs production). Specific working methods will be defined in the Project Policy.
• In order to fully exploit the policy potential of both events, WP 1 will oversee the coordination of two key conferences
within the JA, in close cooperation with WP 2. A Mid-term Conference will be organised within the Slovene presidency
of the EU Council, with participation of all Associated Partners and the PMT, representatives of different relevant
sectors, other interested EU and national stakeholders, representatives of other related projects (i.e. STOP, CO-CREATE)
and initiatives, to present the potentials of the JA actions to the members of the PDMF and other interested EU and MS
policy decision makers. The Final Conference, to be held in M36, will bring together all partners and JA stakeholders
to discuss the final outputs of the JA and sustainability and implementation of project outcomes.
Task 1.2. Joint Action Communications Structure
Task Leader: NIJZ + All Associated Partners
The PMT will communicate with the WP Leaders, Associated and Collaborating Partners via a variety of methods.
These include, but are not limited to: e-mail, telephone, tele-, web- and videoconference, face to face meetings. Emphasis
will be put on regular bilateral web-conferences between the PMT and individual WPs, as well as online SC meetings.
The PMT will collaborate with WP 2 to include up to date news on the JA website, newsletters and closed section for
Associated Partners (intranet). The intranet is foreseen as a closed space for Associated Partners and an online document
repository.
Task 1.3. Joint Action Reporting and Financial Management Structure
Task Leader: NIJZ + All Associated Partners
The JA will be managed through the preparation of two detailed work plans entitled the Best-ReMaP Financial Policy
and the Best-ReMaP Project Policy (already described in the introduction). Both documents have been referred to
in Section 9.3. (Processes and Artefacts) of the Best-ReMaP Proposal. These documents will serve as key manuals/
reference documents for all management and coordination procedures within the JA and will form annexes to the
Consortium Agreement.
The PMT will manage the submission of the Interim and Final Technical and Financial Reports for the JA, as well as
the continuous reporting requirement on the Participant Portal. In addition to the mandatory reporting requirements, we
will require Associated Partners to submit regular six-month financial reports, in order to effectively monitor financial
expenditure. The proven project management system for financial reporting, 4pm, will be used to compile all financial
reports and track expenditure. A Best-ReMaP Financial Policy document will be produced as a one-stop reference
document for all financial management issues for all of the JA partners, with FAQ, reporting procedures, deadlines
and detailed instructions on key reporting issues such as timesheets, monthly costs, reporting of costs within the 4pm
platform, etc.
The complementary Best-ReMaP Project Policy will serve as a guide/reference document for all JA partners on how
to track deliverables, milestones, submit interim/final reports, organise events, hold working groups meetings, etc.
A detailed GANTT chart, including all formal milestones and deliverables and additional internal milestones and
deliverables, will be produced in order to track these key documents/events. Internal milestones and internal deliverables
will be identified for all Work Packages as an addition to the obligatory milestones from the Grant Agreement. Internal
milestones and deliverables will not only serve the Project Management Team to plan and track the progress of the Work
Packages more closely, but will also help Work Packages to stay on track for deadlines.
Page 11 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Participation per Partner
Partner number and short name WP1 effort
1 - NIJZ 103.00
2 - BMASGK 2.00
3 - SCIENSANO 1.00
4 - MCA 2.00
5 - NCPHA 1.00
6 - CIPH 1.00
7 - MoH CY 1.00
8 - DVFA 1.50
9 - MoSA 1.50
10 - THL 2.00
11 - ANSES 3.00
12 - MRI 1.00
13 - ICH 1.00
14 - SU 2.50
15 - DoH 3.00
16 - ISS 2.00
17 - CDPC 1.00
18 - LR SAM 1.00
19 - MFH 1.00
20 - RIVM 1.00
21 - SUM 1.00
22 - DGS 2.50
23 - NIPH 1.00
24 - IPHS 1.00
Total 138.00
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
D1.1 Meeting minutes of
D1.1 1 - NIJZ Report Public 12
the PDMF meetings
D1.2 Meeting minutes of
D1.2 1 - NIJZ Report Public 24
the PDMF meetings
D1.3 Meeting minutes of
D1.3 1 - NIJZ Report Public 36
the PDMF meetings
Page 12 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Description of deliverables
D1.1 Meeting minutes of the PDMF meetings (M12)
D1.2 Meeting minutes of the PDMF meetings (M24)
D1.3 Meeting minutes of the PDMF meetings (M36)
D1.1 : D1.1 Meeting minutes of the PDMF meetings [12]
Minuted discussions and conclusions of the policy decision making forum
D1.2 : D1.2 Meeting minutes of the PDMF meetings [24]
Minuted discussions and conclusions of the policy decision making forum
D1.3 : D1.3 Meeting minutes of the PDMF meetings [36]
Minuted discussions and conclusions of the policy decision making forum
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
M 1.1 Best-ReMaP Kick-off Best-ReMaP Kick-off
MS1 1 - NIJZ 1
Meeting – SC, GA Meeting – SC, GA
M 1.2 Finalised Best-ReMaP
Finalised Best-ReMaP Project
MS2 Project Policy and Financial 1 - NIJZ 4
Policy and Financial Policy
Policy work plans
M 1.3 Signature of Best- Signature of Best-ReMaP
MS3 1 - NIJZ 6
ReMaP consortium agreement consortium agreement
M 1.4 Mid-term conference Mid-term conference
MS4 1 - NIJZ 14
executed executed
M1.5 Delivery of the Interim
MS5 1 - NIJZ 18 Interim Report
Report
M1.6 Final conference
MS6 1 - NIJZ 36 Final conference executed
executed
MS7 M1.7 Final Report 1 - NIJZ 36 Delivery of Final Report
Page 13 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Work package number 9 WP2 Lead beneficiary 10 14 - SU
Work package title Dissemination
Start month 1 End month 36
Objectives
The overall objective of WP2 is to facilitate coherent, effective and sustainable external and internal communication
of the Joint Action and to ensure that its objectives, activities, results and deliverables are known to the stakeholders
and the wider audience of the action.
Description of work and role of partners
WP2 - Dissemination [Months: 1-36]
SU, NIJZ, BMASGK, SCIENSANO, MCA, NCPHA, CIPH, MoH CY, DVFA, MoSA, THL, ANSES, MRI, ICH,
DoH, ISS, CDPC, LR SAM, MFH, RIVM, SUM, DGS, NIPH, IPHS
Task group 2.1. Strategic Documents
Task Leader: SU + All Associated Partners
Task 2.1.1 Stakeholder mapping and analysis
In collaboration with WP 4-7, WP 2 will identify and group stakeholders in a JA stakeholder map. While all core
work packages are expected to contribute to this exercise, it is worth to emphasize the central role of WP4 in the
process, where WP4 is in charge of recommending the integration of the results of the JA into national policies, also
by the mean of mapping the policy decision making stakeholders at the EU and national levels. On the other hand,
WP2 is complementary carrying out a stakeholder mapping exercise of a wide range of the food and nutrition relevant
stakeholders at the EU level and in the participating member states. WP2 will integrate the results of the joint efforts
of both work packages into the JA’s stakeholder map.
In addition, WP2 will also use a few already existing stakeholder maps and recommendations of other EU projects,
primarily the JANPA, STOP and the CO-CREATE projects. While carrying out this task, a legal expert will be involved
by WP2 in order to ensure that GDPR rules are fully respected throughout the process.
Besides analysing and integrating all the above-mentioned stakeholder maps, WP2 will also explore potential new target
groups that are specific to the Best-ReMaP JA.
In the beginning of the project, an online survey will be distributed to all JA partners, upgrading the STOP project
approach , to enable the JA consortium the translation of the research knowledge linked to the stakeholder’s engagement
in the policy practice. Qualitative and quantitative stakeholder analysis will be conducted across core WPs and will
involve all the project partners and where relevant, other stakeholders. The results of the mapping will be reflected in
the Dissemination Strategy, including a minimum of 80 – or ideally 100-120 – stakeholders at the EU level.
Task 2.1.2 Dissemination strategy
The dissemination strategy is to be based on the stakeholder map and the communication strategy (below). This report
is to specify the dissemination aims and objectives, detailed activity planning, identification of the target groups,
dissemination channels, the timing of the dissemination actions and the visibility of European Union co- funding, as
well as the description on JA internal (including intranet, in line with the WP1 activities) and overall communication.
WP2 will first build a communication strategy by collecting the JA’s core messages. Discussions will be held with each
core WP in order to define the WP’s core messages, the timing of their publications and their key target audiences. Then
the results will be matched with the relevant stakeholders identified during the stakeholder mapping as well as with the
most suitable communication channels
The dissemination strategy will provide a strategy for internal and external communication and stakeholder involvement.
The document will also include the descriptions of the dissemination channels related to the specific target groups, see
table of Communication channels and audiences in Task 2.2.
This document will present how all the stakeholders will get involved in the dissemination activities especially at national
level but also at European/international level, based also on the STOP stakeholder sustainability plan (M4).
The dissemination strategy aims to ensure sustainable project results: integrating past actions, it will build on information
from the previous JANPA JA and integrate it into its own website and other communication. To sustain Best-ReMaP
results for the period after the end of the JA, the strategy will foresee that its website is kept accessible and online long-
term, and that Best-ReMaP JA results are integrated within other websites/platforms as well.
Task 2.1.3 Dissemination reports
Page 14 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
WP 2 will produce two reports covering the dissemination activities of the Joint Action for the JA interim and final
reports (M20, M36). This will be a data analytics driven analysis to answer the key questions related to online
communication channels: Which content resonates most with the audience? Who are the followers of the news/
information presented by the JA? Reports will feed in to the evaluation activities of WP 3.
Task 2.1.4 Standardised visual identity
The communication of Best-ReMaP achievements across all communication channels will be based on a standardised
visual identity. The basic visual identity includes the logo and overall house style (e.g. Word templates for reports, PPT
templates, logo variations), described in the Joint Action Corporate design manual. The action will ensure the use of
the co-funding logos and relevant disclaimers in any of the resulting products of the JA. Where possible, the visual
identity will build on the visual precedent of the previous JA in the field and actions related to the HLG on Nutrition
and Physical Activity. (M4)
Task group 2.2 Communication channels & Contents Task
Task Leader: SU + All Associated Partners
This JA will produce information/messages for the professional stakeholders as well as for the wider public who will
be addressed through the channels described under Task 2.2.
Core WPs and their target groups
(final target groups to be specified during the first six months of the project)
WP5: Reformulation and processed food monitoring
Targeted professional group: National or European organisations interested in analysing the food offer available for
the population, and measuring the impact of public health policy interventions, including also medical and nutritionist
organizations.
Targeted lay audiences: Nutrition conscious lay audiences.
WP6: Best practices in the field of marketing of unhealthy food products to children and adolescents
Targeted professional groups: Ministries of health and wide range of national and international stakeholders with
an interest in legislation concerning marketing of food to children, including also relevant medical and nutritionist
organizations.
Targeted lay audiences: Lay audiences conscious about the impact of food marketing to children.
WP7: Public procurement of food in public in Institutions – a pilot EU approach
Targeted professional groups:
● Local and national government bodies managing public procurement of food to public institutions.
● National and local health, nutritionist and education professionals.
● Food procuring public institutions and (local) food providers in agri-food chain.
Targeted lay audiences:
● Those receiving nutrition at public institutions and their relatives especially parents of students.
● Food suppliers.
Communication channels and audiences:
Professional audiences:
Website
Social media
Newsletters
PR campaigns
Online informative videos, content- specific for certain audiences
Webinars
Stakeholder forum events
Lay audiences:
Website
Social media
PR campaigns
Promotional movie I
Promotional movie II
Leaflet for school-aged children
Task 2.2.1 BEST-REMAP website
Page 15 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Development of a website based on discussions with Editorial Board members. This website will provide JA and WP
level information on all activities within the JA. It will also feature a dedicated page for events as well as the newsletters
(M3). From M6 onwards the website will target a minimum of 200 page views per month. Reports are to be based on
Google Analytics.
2.2.2 Newsletters
Five online newsletters will be dedicated to the professional stakeholders. Topics: developments in core WPs, including
latest published reports as well as opportunities to join events and share tasks of the action. WP leaders will be regularly
invited to submit relevant information to WP2 for these newsletters, that is offered to the professional stakeholder
network of the project. (from M6 onwards).
Task 2.2.3 Local stakeholder forum events
Local stakeholder forum events will be organized as the mandatory activity of the JA Associated Partners. Each partner
is to organize one or two such events. Forum organisers will receive methodological support to prepare and run these
events. Forum events can be local, regional or national, depending on the preference and local context. The events are
envisaged as small to midsize events, with around 20-70 people (based on country and financial capacity, local aims).
Task 2.2.4 Social media
A dedicated public Facebook page will be used to reach both the professional and lay audiences (see task 2.2 for detailed
information on target audiences). The calendar of posts for this channel would include two posts per month between
M3 and M12, then one post per week between M13 and M36.
In order to effectively promote the materials posted on Facebook, a portion of the budget will be used for targeted
promotions. This is essential to get more followers for our page and to deliver our messages effectively, as organic
growth on Facebook is extremely low these days. We aim to get at least 500 followers for JA Facebook page in the first
year, and should be on track for 1,500 followers by the end of the JA.
Besides the targeted promotions, a minimum of 7 multipliers will be engaged to repost the project content on a regular
basis. These multipliers are typically European NGOs who are active in the health sector.
In addition to this, it is also important to engage at least 3 influencers. Nowadays there are niche influencers in virtually
all industries and nutrition especially is an increasingly important topic for European families, so there are bound to be
many influencers in this sphere. We would primarily focus on the so called ‘micro-influencers’ as they seem to be more
effective in having an impact on their audiences compared to the so called ‘macro-influencers’.
While completing the social media activities described above, we would strongly rely on the analytical methods of
behavioural economics, as it provides valuable ideas about why people do what they do, and how we can influence their
actions. We aim to utilize this information for delivering our messages in the most effective way that’s possible to our
various target groups, and to lead our audiences to the right thinking and right choices when it comes to nutrition e.g. by
using nudges in our posts, and finding the best time and format for posting, when it comes to the different target groups.
Furthermore, we find it crucially important to address not only adults, but also the younger generations. This requires
communication methods that are different from the traditional ones and can reach and gain the attention of children.
Therefore, we will prepare two short promotional films, out of which one will be specifically prepared for school-aged
children. It will be animation based, 2-3 minutes long and it will potentially address the elements of the healthy diet.
Both films will then be promoted through the project’s social media channels, by using a portion of the promotion
budget as well as the multipliers and influencers engaged. The films will be uploaded to the JA’s YouTube channel and
distributed to all of the EU member states’ public schools through the respective countries’ Ministries of Health and/or
Education. With regards to the film prepared for children, we would prefer to make it completely animation based or
with a limited amount of text only, so it could be easily translated into all EU languages. The film will be brought to the
attention of schools across Europe and it will be recommended that it is showcased as a part of nature, health or sports
classes. A professional framework for a discussion about the film’s content will also be provided to the teachers.
Task 2.2.5 Press releases based PR campaign
In cooperation with the core WPs, we are to lead national and EU-level PR campaigns based on 7 rounds of
communication. The first one is to take place in M3, and then every 4 months from year 2 of the project. The final
content and schedule of these 7 rounds of communication has to be discussed with and accepted by the respective WPs.
These PR materials will be disseminated by WP2 via European media, such as: Euronews, Politico, Euractiv etc. PR
materials and support for the national PR campaigns will be provided by WP2 and sent to project partners. Partners at
the national level will have the opportunity to translate the materials to local language and promote it in national media.
Task 2.2.6 Webinars
Minimum one webinar per core WP will be organised to disseminate WP results. Target audiences and main messages
will be defined according to the dissemination strategy and adapted to the needs of the individual core WPs. Target for
minimum number of participants per webinar is 25 people.
Page 16 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Task 2.2.7 General communication materials
• Introductory leaflet: a piece of informational material intended for both the professional and general public target
audience. The contents will include the core information about the JA’s overall mission, the description of the different
WP’s and the intended outcomes. The leaflet’s purpose is to promote the JA with easy-to-understand details (M3).
• Leaflet for families: A leaflet specifically prepared for school-aged children that will consist of a maximum of 2-3
pages and explain the project’s messages that are most relevant for them (what foods are healthy and which are not, what
happens when you eat unhealthy food, etc.). To make it appealing to and understandable for children, the information
will be presented in a cartoon form and will build on the messages and content of the film mentioned in Task 2.5.5. This
will be an online available downloadable material and could also be distributed in select schools across Europe (M9).
• General PPT presentation on the JA: A general PPT presentation for utilisation by stakeholders and partners, in English
and available for translation to national languages. The contents and aims of the presentation will be similar to the
introductory leaflet but in a PPT format (M6 with on-going updates in M20).
• Layman project report: The Layman report is intended for the general public. This succinct and easy to understand
report will provide a general and brief overview of the JA, the mission of the various WP’s and the outcomes in
layman terminology. It will include the summary of the project’s scope and objectives, description of the methodology,
presentation of the JA outputs and outcomes and transferability of results (M36).
Task 2.2.8 Internal communication - Intranet
Internal communication will serve to harmonise dissemination activities amongst the JA partners, including participation
in Joint Action level events. A dedicated internal space for JA partners, i.e. repository will be provided. At least 70%
percent of the project partners should become users of the JA intranet.
By carrying out the above mentioned tasks under Task 2.2 WP2 will facilitate coherent, effective and sustainable external
and internal communication of the Joint Action and it will ensure that its objectives, activities, results and deliverables
are known to the stakeholders and the wider audience of the action.
Participation per Partner
Partner number and short name WP2 effort
1 - NIJZ 9.00
2 - BMASGK 2.00
3 - SCIENSANO 1.00
4 - MCA 2.00
5 - NCPHA 1.00
6 - CIPH 1.00
7 - MoH CY 1.00
8 - DVFA 1.50
9 - MoSA 1.50
10 - THL 2.00
11 - ANSES 3.00
12 - MRI 1.00
13 - ICH 1.00
14 - SU 71.50
15 - DoH 3.00
16 - ISS 2.00
17 - CDPC 1.00
18 - LR SAM 1.00
19 - MFH 1.00
Page 17 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Partner number and short name WP2 effort
20 - RIVM 1.00
21 - SUM 1.00
22 - DGS 2.50
23 - NIPH 1.00
24 - IPHS 1.00
Total 113.00
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in
Number14
months)17
MD.2.1 Introductory
D2.1 14 - SU Report Public 3
leaflet
Websites,
D2.2 MD.2.2 Website 14 - SU patents Public 3
filling, etc.
D2.3 Dissemination
D2.3 14 - SU Report Public 4
strategy
MD2.4 Mid-term report
D2.4 14 - SU Report Public 18
on Dissemination
Websites,
D2.5 Promotional movies
D2.5 14 - SU patents Public 36
completed
filling, etc.
MD2.6 Layman version
D2.6 14 - SU Report Public 36
of the final report
MD2.7 Final report on
D2.7 14 - SU Report Public 36
Dissemination
Description of deliverables
MD 2.1 Introductory leaflets (M 3)
MD 2.2 Website (M 3)
D 2.3 Dissemination strategy (M4)
MD 2.4 Mid-term report on Dissemination (M 20)
D 2.5 Promotional movies completed (M36)
MD 2.6 Layman version of the final report (M 36)
MD 2.7 Final report on Dissemination (M 36)
D2.1 : MD.2.1 Introductory leaflet [3]
This is a publication with core project information to promote the JA with easy-to-understand details.
D2.2 : MD.2.2 Website [3]
This website will provide project and WP level information on all activities of the project. It will also feature a
dedicated page for events and well as the newsletters.
D2.3 : D2.3 Dissemination strategy [4]
Page 18 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Strategy specifies the dissemination aims and objectives, detailed activity planning, identification of the target groups,
dissemination channels, the timing of the dissemination actions and the visibility of European Union co- funding, as
well as the description of JA
D2.4 : MD2.4 Mid-term report on Dissemination [18]
Data analytics driven analysis to answer the key communications questions: Who are the followers of the news/
information presented by the project? Which content resonates with the audience?
D2.5 : D2.5 Promotional movies completed [36]
Two short promotional films, out of which one will be specifically prepared for school-aged children. It will be
animation based, 2-3 minutes long and it will address the elements of the healthy diet.
D2.6 : MD2.6 Layman version of the final report [36]
This is a short, 4 pages version of the final report with infographic, written for the wide public as a target group.
D2.7 : MD2.7 Final report on Dissemination [36]
Data analytics driven analysis, making the final evaluation of the communication activities.
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
MS8 M2.1 6th Newsletter issued 14 - SU 35 6th Newsletter issued
M2.2 Webinars to disseminate Webinars to disseminate WP
MS9 14 - SU 36
WP results completed results completed
Page 19 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Work package number 9 WP3 Lead beneficiary 10 10 - THL
Work package title Evaluation
Start month 1 End month 36
Objectives
The general objective of this WP is to ensure that JA is implemented as planned and that it accomplishes the objectives
as defined in the Grant Agreement. Therefore, it aims to:
1. Develop the evaluation strategy, the methodology, and necessary tools to carry out a systematic and continuous
monitoring of processes, outputs and outcomes
2. Supervise the time schedule and work progress related to the evaluation.
3. Support the JA by monitoring the progress of the work packages in relation to the given Joint Action timetables, and
if necessary, intervene and recommend corrective activities.
4. Coordinate and carry out the evaluation according to the plan, and prepare and publish interim evaluation report and
final evaluation report.
Description of work and role of partners
WP3 - Evaluation [Months: 1-36]
THL, NIJZ, BMASGK, SCIENSANO, MCA, NCPHA, CIPH, MoH CY, DVFA, MoSA, ANSES, MRI, ICH, SU,
DoH, ISS, CDPC, LR SAM, MFH, RIVM, SUM, DGS, NIPH, IPHS
Work Package 3 (WP3) is responsible for evaluation of the Joint Action. Continuous evaluation is an instrument to
ensure the achievement of the proposed objectives. The focus is on evaluation strategies which are practical and ongoing,
and which involve all the Work Packages in order to support them in their work and in achieving their objectives. The
WP3 will work in close collaboration with the WP1, as well as the Steering Committee of the JA.
The evaluation will have two major components; monitoring of the implementation and the impact of the
implementation. For both aims, a set of indicators with supporting data collection methods will be finalised. The data
collection methods will include self-administrated online questionnaires, interviews with WP leaders, as well as an
external review to provide a stakeholder assessment of the JA implementation, quality and impact.
The evaluation will be based on both internal self-assessments of the activities and impacts, as well as on an
external evaluation. The external evaluation will be subcontracted to non-participating institutions with expertise of JA
evaluation. The external evaluators will advise will advise on the evaluation strategy and peer-review all WP3 activities
and reports, providing independent feedback to ensure the validity of WP3 assessment.
Task 3.1: Monitoring and Evaluation strategy
Task Leader: THL+ All Associated Partners
1. To develop the overall evaluation strategy and plan for the activities in the JA, so that any potential problems or
delays and their causes in relation to the plan can be identified early on and corrective measures can be implemented.
The strategy will be developed together with the work package leaders, in order to determine which parts of the WPs
evaluation should be focused on. The strategy will outline the overall evaluation plan with detailed methodology for data
collection and analyses. Data collection will include a number of online questionnaires for the WP leaders. Evaluation
will cover both the horizontal (Management and Dissemination) and the vertical WPs. The draft evaluation strategy
will be developed during the early stage of the JA. (M3)
2. Finalization of the evaluation plan: At this stage, details of the evaluation process including details on methodology,
tools, data-collection, indicators, processes and deadlines will be finalized. Support material for the necessary data
collection (interviews, questionnaires etc.) will also be finalized at this stage.
The subcontracted external evaluators will contribute to the development and finalization of the evaluation strategy.
(M5)
Task 3.2: Continuous and interim evaluation
Task Leader: THL+ All Associated Partners
3. Implementation of the evaluation includes systematic evaluation of the timeline, processes, quality and outcomes
of the work. Reporting of these and recommendations about any potential corrective actions will be done periodically
within the JA timeline (e.g. Joint Action working group meetings and Steering Committee meetings), and in the Mid-
term Evaluation Report (M20).
Page 20 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Continuous evaluation will be based on self-assessment of the WP activities. Data collection methods will be put into
place to gather the required information for monitoring and evaluation. This will include surveys to assess progress
within the individual WPs concerning implementation, feasibility and quality of the work, as well as satisfaction with
the JA overall progress and activities. Special focus within the continuous evaluation will be on the monitoring and
management of the anticipated risks and the contingency planning and implementation throughout the JA within the
individual WPs, especially in the new Covid-19 pandemic. Any possible modifications and refinements in the evaluation
plan and processes will be done based on the experiences of the evaluation activities during the early stages of the JA.
The interim report will also include a critical review of the evaluation strategy based on the experiences during
preparation of the interim report. Based on this review, a revision will be made to the evaluation strategy, if needed.
The subcontracted external evaluators will contribute to the data collection, reporting and reviewing the Mid-term
evaluation report (M20).
Task 3.3: Final evaluation report
Task Leader: THL+ All Associated Partners
Upon the completion of the Joint Action, WP3 will be responsible for publishing an overall evaluation report of
its activities and achievements. The final evaluation report will include a critical review of the activities, processes,
achievements and results of all the work packages in relation to the overall objectives of the JA. Joint action partners will
be invited to self-evaluate their own work and assess the results of it in relation to the joint action deliverables. (M36)
In addition to the internal evaluation which is mainly based on a critical review of self-assessment of the JA activities,
feasibility, efficacy and results, the subcontracted external evaluators will be involved in drafting the final evaluation
report. The aim of this is to include an independent review from the stakeholders on the relevance and effectiveness
of the JA. (M36)
Participation per Partner
Partner number and short name WP3 effort
1 - NIJZ 5.00
2 - BMASGK 2.00
3 - SCIENSANO 1.00
4 - MCA 2.00
5 - NCPHA 1.00
6 - CIPH 1.00
7 - MoH CY 1.00
8 - DVFA 1.50
9 - MoSA 1.50
10 - THL 50.00
11 - ANSES 3.00
12 - MRI 1.00
13 - ICH 1.00
14 - SU 2.50
15 - DoH 3.00
16 - ISS 2.00
17 - CDPC 1.00
18 - LR SAM 1.00
19 - MFH 1.00
20 - RIVM 1.00
Page 21 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Partner number and short name WP3 effort
21 - SUM 1.00
22 - DGS 2.50
23 - NIPH 1.00
24 - IPHS 1.00
Total 88.00
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
D3.1 D3.1 Evaluation strategy 10 - THL Report Public 5
MD2.3 Mid-term report
D3.2 10 - THL Report Public 18
on Evaluation
MD3.3 Final Evaluation
D3.3 10 - THL Report Public 36
report
Description of deliverables
D3.1 Evaluation strategy (M 5)
MD3.2 Mid-term report on Evaluation (M 20)
MD3.3 Final Evaluation report (M 36)
D3.1 : D3.1 Evaluation strategy [5]
Preparation and publication of the evaluation strategy
D3.2 : MD2.3 Mid-term report on Evaluation [18]
Report on the progress, processes and outcomes, and recommendations for the remaining work period.
D3.3 : MD3.3 Final Evaluation report [36]
The final evaluation report outlining the central outcomes and conclusions related to the objectives.
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
M3.1 Selection of external Selection of external
MS10 10 - THL 1
evaluators evaluators
M3.2 First meeting with the First meeting with the
MS11 10 - THL 4
external evaluators external evaluators
M3.3 Completed outcome Completed outcome
MS12 evaluation with external 10 - THL 36 evaluation with external
evaluators evaluators
Page 22 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Work package number 9 WP4 Lead beneficiary 10 16 - ISS
Work package title Sustainability and Integration in National Policies
Start month 1 End month 36
Objectives
The aim of the WP 4 is to foster the transfer and integration of the results and outcomes of the core WPs into national
and European policies. Therefore, this WP will strongly collaborate with the core WPs; and the outcomes regarding
food reformulation, food marketing and advertising to children and adolescents and public procurement will be brought
for discussion to the High Level Group on Nutrition and Physical Activity (HLG). The coordinator of the JA and the
WP4 leader will report regularly to the HLG about the results of the JA. In addition, each core technical WP will
have a corresponding subgroup of HLG (reformulation already existing, procurement and marketing to be constituted),
working in line with the three corresponding Framework on Action documents (defined in WPs 5, 6 and 7). These
subgroups will be supported by EU external experts and will discuss specifically the translation of the outcomes into
the public health initiatives.
Steering Group on Prevention and Promotion will also be regularly informed about the progress of actions.
Then, the outcomes will be channelled into a series of events (as indicated in Tasks 4.2, 4.3. and 4.4.), both at European
level and MS level. These events will primarily involve policy decision makers, but in a second round will allow for a
public health driven dialogs and will include also a wide range of stakeholders from different societal spheres, including
also private sector stakeholders, such as food producers and retailers.
To pave the way for the policy decision maker’s discussions, we will first prepare a ‘Draft Integration and sustainability
plan (Report on sustainability and integration in national policies)’.
The following step will be policy decision making stakeholder mapping in each country. This information will be
completed with a list of relevant policies and infrastructures identified in the core WPs for each participating country
and at European level taking into account the differences in the legislative and policy context.
Next, representatives of European Institution and Member states will set up policy dialogues on the legislative and
policy opportunities identifying the next steps. Discussions will run both at national and European level to facilitate
experience sharing within and between different countries. The meeting outcomes, with the policies that the MS will
commit to transfer into their national guidelines and normative, will be summarized in briefs.
Joint activities in increasing the governance mechanisms of core work packages will be merged in WP4, such and Joint
Research Centre food database, possible Council Conclusions and possible Food systems indicator in the European
Semester.
The EU-added value of this JA will be supporting the EC and the MSs in attempt modifying the obesogenic food
environment and making the healthy food options more accessible to European children and adolescents and their
caregivers, as EU citizen.
Description of work and role of partners
WP4 - Sustainability and Integration in National Policies [Months: 1-36]
ISS, NIJZ, BMASGK, SCIENSANO, MCA, NCPHA, CIPH, MoH CY, DVFA, MoSA, THL, ANSES, MRI, ICH,
SU, DoH, CDPC, LR SAM, MFH, RIVM, SUM, DGS, NIPH, IPHS
Task 4.1 Building on the outcomes of other JAs and initiatives
Task Leader: ISS + All Associated Partners
This task will build on the knowledge and outcomes of previous and ongoing European initiatives and key strategic
documents, to give the present JA a solid base. The initiatives and documents that will be considered, among others, are:
1. the final recommendations of the Joint Action on Nutrition and Physical Activity (JANPA),
2. existing reports summarizing the EU Semester processes and options regarding sustainability and SDGs,
3. the conclusions of the meetings of the High-Level Group on Nutrition and Physical Activity and of the Steering
Group on Prevention and Promotion,
4. the indications of the “Farm to fork” strategy of the European Commission,
5. EU Cancer beating plan
6. the Presidencies’ Council conclusions and the roadmaps of the European Presidencies (e.g. use of the Austrian
Presidency Food system roadmap, Dutch roadmap on reformulation) and options for a new Childhood Obesity Action
Plan,
Page 23 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
6.the guidelines and options regarding the European Structural Support Services for potential support to Member States
beyond the Best-ReMaP Joint Action,
7. New postCovid-19 Europe4Health plan and relevant others.
The methodology of this task will include desk research to identify facilitating and hindering factors for the sustainability
of the project (annexed in Integration and sustainability plan). This desk search will be carried out on the official websites
of the EU institutions and the MS, the dissemination websites of the JAs and the archives of the scientific peer-reviewed
literature. The initial search keywords will be: food indicators, EU semester process, childhood obesity prevention, food
environment, policy.
The executive abstracts of the retrieved documents will be read and if the content is considered within the scope of the
research and of the appropriate quality level and checked for the possible conflicts of interest. The relevant information
will be extracted using a form predisposed at the start of the activity of the task. The paper selection and the information
extraction will be carried out independently by two researchers. The above-mentioned documents will also be analysed
in order to study the priorities already set and policies already discussed or under consideration at national and European
level. At the moment, it is not possible to foresee what and how many documents will result from the search.
The activity of the task will be completed with at least 9 semi-structured interviews (3 for each core WP) with experts to
understand what actions make an initiative sustainable. The experts will be picked up among representatives from DG
Nutrition of WHO Europe, DG Santé of the EC, JRC and colleagues that are leading or have led the WP on sustainability
of other JAs and European projects and possible other relevant experts. Also, policy decision makers from MS will be
interviewed to understand what the national decision makers expect from this JA.
The subcontractor will contribute to identifying and analysing pertinent key EU processes and tools, help identify the
experts to interview, with additional focus on equity and sustainability.
Task 4.2 Policy decision makers level stakeholder mapping
Task Leader: ISS+ All Associated Partners
This task will mainly identify EU policy decision makers and the stakeholders via welfare mix (public and private,
formal and non-formal, profit and non-profit), linked to the activities of WP5, WP6 and WP7. In this task, the mapping
will be focused on governmental and institutional stakeholders (annexed in Integration and sustainability plan). The list
will act as a pool of participants for the policy dialogue events in Task 4.4. The work will be performed in alignment
with the WP10 of the H2020 project STOP and also with the INFORMAS network. For each stakeholder, its network,
the level of activity and area of interest will be described.
The modality of engagement of the MSs decision makers and stakeholders, that will be in common with the STOP
project, will be described in detail, so it will represent a sustainability best practice to be replicate in the next JA.
Alongside this, an Advisory Board in the form of the Policy Decision Makers Forum, including representatives of
the European Parliament, European Commission (i.e. DG SANTE, DG Research and Innovation, DG AGRI, DG
Connect…) established in Task 1.1, will facilitate the policy decision making level stakeholder involvement in the
process.
A subcontractor will contribute to identifying the groups of relevant stakeholders at EU and national levels, especially in
food procurement area, exploring its network and subsequently identifying their level of influence and level of interest.
Task 4.3 Actions on EU and national policies
Task Leader: ISS + All Associated Partners
The first step of the integration of relevant policies is the discussion to the High Level Group on Nutrition and Physical
Activity (HLG). The coordinator of the JA and the WP4 leader will report regularly to the HLG about the results
of the JA. With the representatives of the MSs in the HLG, it will decide what policies resulted from the JA to be
implemented in the MS. To inform policy decision makers in that process and to allow for discussion, ‘Draft Integration
and sustainability plan’ will be prepared as the first step. The outputs of the meeting with the HLG will be discussed
among WP leaders, the JA coordinator, the sustainability WP leader and the subcontractor, to assess the options and
make recommendations on the modality to transfer the results into EU and national policies.
Finally, the results will be then feed into the ‘Final Integration and sustainability plan’ that will summarize the proposed
policies and the modality to change existing measures at European and MS level. The Report and the possibilities for
implementation will be discussed during the Policy dialogue briefs at task 4.4 and within the scope of the HLG. Steering
Group on Prevention and Promotion will be informed about the JA developments, too.
Task 4.4 Series of Policy dialogues
Task Leader: ISS + All Associated Partners
A series of stakeholder meetings, with the focus on policy decision makers, will be at the core of WP4. These events will
allow policy decision makers to transfer the outcomes of the core WPs into their national and EU policies and legislation
and the modality, therefore ensuring the sustainability of the JA results. Guidelines, guidance and recommendations by
public health authorities, legislative acts, etc. will be prepared through the discussion with the national decision makers,
Page 24 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
policy makers and other stakeholders. There will be four policy dialogue briefs in total; a plenary dialogue with EU-
level policy makers and other relevant stakeholders, including food producers and retailers will take place by M34. The
EU regions level will also be included through three regional policy dialogues (Scandinavian/Northern, Mediterranean
and Central European regions) from M 28-33, which all the EU MSs will be invited to.
The tentative agenda of these events, to be replicated for all the edition is: 1) Presentation of the outcomes of the JA and
the policies to be implemented – Description of the Report on Integration (Best-ReMaP Coordinator and WP leaders); 2)
Current situation in the EU/MS involved in Policy Dialogue brief (MS representatives); 3) The stakeholders engagement;
4) Amendments to 5) Reporting from the MSs to on the policies to be transferred into their national recommendation,
guidelines and normative.
At the end of each Policy Dialogue, a brief with the relevant conclusions for each MS will be made available and
circulated.
The aim of the final plenary event is to present information on the conclusions of the JA and to submit the proposal for
recommendations to the closest upcoming Council for Council Conclusions, if taken further by the actual presidency
member state.
The coordinator of the JA and the WP4 leader will report regularly to the HLG about the results of the JA. In addition,
each core technical WP will have a corresponding subgroup of HLG (reformulation already existing, procurement and
marketing to be constituted), working in line with the three corresponding Framework on Action documents (defined in
WPs 5, 6 and 7). These subgroups will be supported by EU external experts and will discuss specifically the translation
of the outcomes into the public health initiatives.
Activities in Task 4.4. will be supplemented with those of Task 2.2.4 Local Stakeholder Forums, promoting uptake at
national level.
A subcontractor will facilitate setting the objectives with the Member States representatives and EU stakeholders
participating to the Policy Dialogue events and will produce short policy briefs with Member States based on Best-
ReMaP JA outcomes, to inform the participating stakeholders of what has been achieved up to date in order to build
on, rather than replicate, existing work.
Task 4.5 Food information database
Task Leader: NIJZ, ANSES + All Associated Partners
Linking the results of the core WPs, a food information database with working title JRC food database will be developed.
This database will include also the pre-existing results of the EUREMO project and JANPA and will be further upgraded
with the JA Best-ReMaP inputs. The JRC will host the data in its open access Data Catalogue and will also develop
the database in a more user-friendly manner by developing a visualisation tool (with features similar to that of ECIS
- https://ecis.jrc.ec.europa.eu/). The JRC food database will offer to the Member States a long-lasting tool to regularly
report the national data to the JRC food database and to explore the data and make it available to researchers and public
policy advisors for the national policies and legislation. A sustainable system (with national policy encouragements or
European indicators) to keep expanding the dataset by the Member States after the conclusion of the activities of Best-
ReMaP will be defined.
WP4 will synthesize the policies, mainly monitoring of reformulation (WP5) and of reducing (digital) food marketing
to children (WP6) and public food procurement (WP7), by exploring and developing the options to use JRC database
as the source of the above mentioned information. JRC food database will be checked for the possibility of comparing
with the EFSA food intake database, which includes socio-economic data of food intake.
Food systems indicators will be possibly developed and the data for that indicator will rely on the new JRC food database.
Participation per Partner
Partner number and short name WP4 effort
1 - NIJZ 13.50
2 - BMASGK 2.00
3 - SCIENSANO 1.00
4 - MCA 2.00
5 - NCPHA 1.00
6 - CIPH 1.00
7 - MoH CY 1.00
Page 25 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Partner number and short name WP4 effort
8 - DVFA 1.50
9 - MoSA 1.50
10 - THL 2.00
11 - ANSES 3.50
12 - MRI 1.00
13 - ICH 1.00
14 - SU 2.50
15 - DoH 3.00
16 - ISS 38.00
17 - CDPC 1.00
18 - LR SAM 1.00
19 - MFH 1.00
20 - RIVM 1.00
21 - SUM 1.00
22 - DGS 2.50
23 - NIPH 1.00
24 - IPHS 1.00
Total 85.00
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
D4.1 Documents
D4.1 retrieved in the desk 16 - ISS Report Public 6
research
MD4.2 Integration
and sustainability plan
D4.2 (Report on sustainability 16 - ISS Report Public 36
and integration in
national policies)
D4.3 Briefs of the four
D4.3 16 - ISS Report Public 36
policy dialogues
Description of deliverables
D 4.1 Documents retrieved in the desk research (M6)
MD 4.2 Integration and sustainability plan (Report on sustainability and integration in national policies) (M36)
D 4.3 Briefs of the four policy dialogues (M36)
D4.1 : D4.1 Documents retrieved in the desk research [6]
Summary of the conclusions and recommendations of relevant documents, websites and scientific literature, dealing
with the factors related to the sustainability of a project.
Page 26 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
D4.2 : MD4.2 Integration and sustainability plan (Report on sustainability and integration in national policies) [36]
This report will include a proposed plan describing which results will be further developed, consolidated and
integrated into policies and national plan and by which organization(s) it would be done.
D4.3 : D4.3 Briefs of the four policy dialogues [36]
Briefs summarizing the results of the discussion with EU and MSs during the policy dialogues and the commitments
by the MSs.
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
M4.1 At least 6 semi-
At least 6 semi-structured
structured interviews have
MS13 16 - ISS 12 interviews have been carried
been carried out in relation to
out in relation to Task 4.1
Task 4.1
M4.1 At least 3 semi- At least 3 semi-structured
structured interviews have interviews have been
MS14 16 - ISS 18
been implemented in relation implemented in relation to
to Task 4.1 Task 4.1
M4.3 JRC implements food JRC implements food
MS15 16 - ISS 34
database database
M4.4 Policy dialogues
MS16 16 - ISS 36 Policy dialogues completed
completed
Page 27 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Work package number 9 WP5 Lead beneficiary 10 11 - ANSES
Work package title EU Harmonised Reformulation and processed food monitoring
Start month 1 End month 36
Objectives
The aim of this work package is to share and to promote, in the different countries participating in the work package,
the best practices on how to implement a European sustainable monitoring system for processed food reformulation.
The use of these best practices will contribute to a standardised monitoring system at the European level to facilitate
comparisons and to encourage the improvement of the nutritional quality of the European food supply, especially for
children. The identification of the best reformulations of processed food, by analysing the trend assessment between
consecutive snapshots, stimulates food providers for the improvement of the nutritional quality of their processed
products and creates a virtuous circle at the European level, for the improvement of the food supply.
According to the JANPA methodology, the nutritional composition, ingredients and portion size of processed foods,
provided on labels with the European Regulation N°1169/2011 (proteins, carbohydrates, salt, sugars, fats, saturated
fats and energy) will be collected and standardised. The processed food monitoring consists of the collection, encoding
and analyses of these nutritional data with several snapshots over time. This processed food monitoring will allow
the identification of the best reformulations, the evaluation of reformulation initiatives and their impacts on nutrient
intakes of consumers according to socio-economic parameters. A focus will also be made on children. The encoding of
ingredients could also contribute to the European sustainable food products.
The sustainability of this harmonised monitoring system at the European level will be studied with European actors (JRC,
DG SANTE, High level group) and encouraged. Harmonised sustainable Framework for Action on reformulation is
already established as the subgroup of the HLG. HLG itself could be supported by external expert group on reformulation
and it will be used as a governance mechanism in this WP, linked with WP4 (in task 4.1).
Description of work and role of partners
WP5 - EU Harmonised Reformulation and processed food monitoring [Months: 1-36]
ANSES, NIJZ, BMASGK, SCIENSANO, MCA, NCPHA, CIPH, MoH CY, DVFA, MoSA, THL, MRI, ICH, SU,
DoH, ISS, MFH, RIVM, SUM, DGS, NIPH
Task 5.1: Optimization of the European harmonised processed food supply monitoring Task leader: ANSES,
Participating partners: AGES, SCIENSANO, MCA, PHI-FBH, PHI-RS, NCPHA, DFVA, NIHD, MoSA, THL, MRI,
ICH, NIPN, FSAI, MFH, RIVM, NIJZ
Collaborating partner: EFSA, ICF
Task 5.1.1: Prioritization of the processed food categories.
Task 5.1.1.1: The harmonized EFSA food intake comprehensive database (representative of the national food
consumption habits) will be used to assess the contribution of each food group to the total nutrient intakes (fat, saturated
fat, sugars, salt) for each country. The 10 or 20 biggest contributors (especially for children), for all countries, will make
up the European priority processed food groups to include in the monitoring. According to the data available in the
EFSA database, socio economic parameters (education level for example) will be included in the analyses to consider
vulnerable populations and inequalities. (Deliverable D5.1).
Task 5.1.1.2: The list of the European priority processed food groups will be validated with a consultation of each
country (Deliverable 5.1). A good correspondence with the processed foods already collected with the EUREMO project
will be ensured (the 10-20 food groups will be one part of the food list of the EUREMO project).
Task 5.1.2: Improving efficiency and sustainability of monitoring efforts
Subtask leader: SCIENSANO, participating partners: ANSES, AGES, THL, ICH, FSAI, MFH, RIVM Collaborating
partner: ICF
New digital sources of data (crowdsourcing, open databases, Foodswitchor GS1) and new technologies (photos and text
extraction) will be explored within this task. In particular, the representativeness and the reliability of these new sources
and technologies will be tested and analysed.
The following activities are planned:
• A comparison between traditional approaches to monitoring and crowdsourcing for key food supply indicators. The
Open Food Facts database will be used and for countries with sufficient data, compared to traditional monitoring
approaches (either already existing data, or data collected through EUREMO or through task 5.3 and/or
5.4 in the current project)
Page 28 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
• A comparison between traditional approaches to monitoring and web scraping for key food supply indicators. Only
countries which have already web scraping in place will be included and these data will be compared to traditional
monitoring approaches (either already existing data, or data collected through EUREMO or through task 5.3 and/or
5.4 in this JA)
• A comparison between traditional approaches to monitoring and GS1 for key food supply indicators. Only countries
which are already using GS1 data will be included and these data will be compared to traditional monitoring approaches
(either already existing data, or data collected through EUREMO or through task 5.3 and/or 5.4 in the current project)
• Within the EUREMO project the feasibility of text extraction for ingredients and nutrients from pictures of food
packaging will already be tested. A more elaborated pilot study could be conducted if the first tests are promising.
The comparison of the different sources of data will constitute a specific part of the deliverable D5.2.
Task 5.2: MS Assistance for the Food reformulation monitoring
Task Leader: ANSES. Participating partners: MoH-FR, ISS, AGES, SCIENSANO, MCA, PHI-FBH, PHI-RS, NCPHA,
CIPH, DFVA, NIHD, MoSA, THL, MRI, ICH, NIPN, FSAI, MFH, RIVM, SUM, DGS,
NIPH, NIJZ, Collaborating partners: EFSA, JRC, DG Sante
Task 5.2.1: Organization of one workshop to disseminate the first snapshot results and to promote JANPA methodology.
All volunteer countries interested in the reformulation monitoring will profit from the experience of countries already
engaged.
Task 5.2.2: Analyses of the pre-existing data and harmonization to the JANPA/Oqali methodology in order to include
volunteer countries in the second snapshot (batch 1 or 2 according to the work to do for the harmonization to the JANPA
methodology). All countries
with data already available at the branded level could standardize and harmonize their data to the Oqali/JANPA
classification, to make them compatible with the JANPA methodology and a second snapshot. A double check with
ANSES will be necessary. Knowledge on food science and food composition will be required for the execution of the
task.
Task 5.2.3: Elaboration of technical guidelines for monitoring of the processed food supply and reformulation
(Deliverable 5.1). The guidelines will describe precisely the definition and the scope of the processed food pertinent
to be included in a reformulation monitoring system (Task 5.1.1), the optimization of the reformulation monitoring
(Task5.1.2 and the monitoring methodology. The Guidelines will help countries to implement a monitoring system over
time, to assess the reformulations and their impacts on nutrient intakes. We will experiment with the guidelines test
them during the first snapshot (Task 5.3.1).
Task 5.2.4: Linked to the WP 4, encourage MS to implement first or second snapshot (national action plan) and start
developing an open European database with working title JRC Food database. To assure the sustainability of the
reformulation monitoring at the European level, such as common tools (JRC food database, common food quality
indicators), will be discussed and key European actors will be approached (Commission, EFSA, JRC). European food
system indicator will be proposed, the same for recommendations (Deliverable 5.2).
Task 5.2.5: Organization of one workshop of restitution with stakeholders (at European level) so that each country could
present own national initiatives. The appropriation of these results by the countries, the food providers and the European
Commission, is an essential point to include in WP 4, as a subsequent step to proceed after the end of the Best-ReMaP JA.
Task 5.3: Extension of the first European Snapshot of the nutritional quality of the processed food
Task Leader: ANSES. Participating partners: MCA, PHI-FBH, PHI-RS, CIPH, MoH CY, FSAI, SUM
The first European Snapshot of the nutritional quality of the processed food will be extended with volunteer countries,
complementing the food offer monitoring already implemented by the JANPA and EC-funded (EUREMO) projects.
Task 5.3.1: According to the JANPA Methodology and for the 5 priority food groups, volunteer countries (those which
have not yet been involved to reformulation monitoring activities JANPA or EUREMO) have to collect (taking product
pictures) and encode the nutritional data provided on labels of processed food. A preparatory training will be organized
by ANSES to present and explain the methodology. The food classification guidelines previously written (Task 2.3)
will be experimented with and adjusted if needed. Knowledge on food science will be requested for executing this task.
Task 5.3.2: According to the JANPA Methodology, involved countries have to produce statistics by JANPA/Oqali
subcategories of products. A webinar organized by ANSES, will explain the methodology. Knowledge on statistics will
be requested for executing this task. A report by each MS will be included in the deliverable D5.3 and some of these
statistics could be presented at the final workshop (Task 2.5).
Task 5.4: Implementation of the second European Snapshot of the nutritional quality of the processed food
Task Leader: ANSES. Participating partners: AGES, SCIENSANO, NCPHA, DFVA, NIHD, THL, MRI, ICH, NIPN,
ISS, MFH, DGS, NIPH, NIJZ
Page 29 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
According to the JANPA Methodology and for the 5 priority food groups, volunteer countries have to collect and
encode the nutritional data provided on labels of processed food and make a link between products collected in the first
and/or the second snapshot (products added, removed, reformulated or identical). Knowledge on food science will be
requested for executing this task. A batch1 for countries with data already available will be implemented in 2021-2022.
For countries for which the first snapshot is operated by EUREMO in 2019-2020, a batch2 will be implemented in
2022-2023 to maintain a three-year interval between two consecutive snapshots.
Task 5.4.1: Batch1 of second snapshot for some volunteer countries with a first snapshot already available and
compatible with the JANPA methodology (JANPA1, others countries with first snapshot available). A preparatory
training will be organized by ANSES to present and explain the methodology and the food classification. Guidelines
previously written (Task 2.3) will be experimented with and adjusted if needed.
Task 5.4.2: Batch2 of second snapshot for some volunteer countries with a first snapshot covered by EUREMO project.
A preparatory training will be organized by ANSES to present and explain the methodology and the food classification.
Guidelines previously written (Task 2.3) will be used.
Task 5.5: Trend assessment of the nutritional quality of the processed food
Task Leader: ANSES. Participating partners: AGES, SCIENSANO, NIHD, MoSA, MRI, NIPN, FSAI, RIVM, NIPH,
Collaborating partner: EFSA
Task 5.5.1: Trend assessment of the nutritional quality of the processed food, for countries and food categories for which
old data (collected during EUREMO project for example) and new food composition data (collected during the Batch
1 of the second snapshot) are available. Each country participating in task 5.4.1 could assess the nutritional quality
evolutions and identify best reformulations, based on the nutrient mean values of subcategories of products. Knowledge
on statistics will be requested for executing this task. A report by each MS will be included in the deliverable D5.3.
Task 5.5.2: Nutrient intakes changes due to the processed food reformulation, using the comprehensive database of
EFSA (limited to MS included in the batch1 of second snapshot, for which old and new data of food composition are
available at the M25). To assess the impact on nutrient intakes (fats, saturated fats, sugars, salt) of adults and children, it
will be necessary to link nutritional composition data (JANPA/ Oqali classification of processed food) and consumption
data (Food Ex2 classification of the EFSA comprehensive database). Then, the nutrient intakes will be estimated, using
nutritional composition data issued from the first and second snapshot respectively (Results of Task 5.1), to assess
the impact of reformulations on nutrient intakes. According to the data available in the EFSA database, the impact of
reformulation on nutrient intakes according to socio-economic status will also be studied to assess the reformulation
impacts on social inequalities. A focus will also be made on children.
Task 5.5.3: European comparisons of the processed food reformulations, based on JANPA indicators: Impacts of the
processed food reformulations and the food supply turnover (limited to MS included in the batch1 of second snapshot).
Based on the results of the Task 5.1, some comparisons of reformulations or of turnover of products, could be made
between countries. The added value of Best-ReMaP is the future possibility, for the first time in a number of countries
at the EU level, to assess the impacts of reformulation activities on nutrients intakes in children.
Participation per Partner
Partner number and short name WP5 effort
1 - NIJZ 17.00
2 - BMASGK 17.00
3 - SCIENSANO 28.00
4 - MCA 14.50
5 - NCPHA 14.00
6 - CIPH 14.00
7 - MoH CY 12.00
8 - DVFA 12.00
9 - MoSA 23.00
10 - THL 15.00
Page 30 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Partner number and short name WP5 effort
11 - ANSES 97.00
12 - MRI 23.00
13 - ICH 17.00
14 - SU 19.00
15 - DoH 23.00
16 - ISS 13.00
19 - MFH 17.00
20 - RIVM 7.00
21 - SUM 13.00
22 - DGS 14.00
23 - NIPH 17.00
Total 426.50
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in
Number14
months)17
D5.1 Development of
the Guidelines for an
European harmonised
and sustainable
D5.1 11 - ANSES Report Public 9
monitoring system of the
processed food supply,
consultation/ temporary
report
D5.2 Final Guidelines for
an European harmonised
D5.2 and sustainable 11 - ANSES Report Public 30
monitoring system of the
processed food supply
D5.3 Report on
reformulation
monitoring: monitoring
implementation,
D5.3 11 - ANSES Report Public 36
reformulation
comparisons and
reformulation impacts on
nutrient intakes
Description of deliverables
D5.1 Development of the Guidelines for an European harmonised and sustainable monitoring system of the processed
food supply, consultation/temporary report (M9)
D5.2 Final Guidelines for a European harmonised and sustainable monitoring system of the processed food supply
(M30)
Page 31 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
D5.3 Report on reformulation monitoring: monitoring implementation, reformulation comparisons and reformulation
impacts on nutrient intakes (M36)
D5.1 : D5.1 Development of the Guidelines for an European harmonised and sustainable monitoring system of the
processed food supply, consultation/ temporary report [9]
This report will help countries to implement and maintain a reformulation monitoring system. The methodology will
be explained with the standardised subcategories of products to apply for an adequate reformulation monitoring. This
document will be tested during the snapshot implementations.
D5.2 : D5.2 Final Guidelines for an European harmonised and sustainable monitoring system of the processed food
supply [30]
Final guidelines will help European countries to implement and maintain a reformulation monitoring system with the
reformulation monitoring methodology, the priority processed food groups to monitor, the best sources of data or best
technologies to use for the data collection, the conditions for a sustainable European monitoring.
D5.3 : D5.3 Report on reformulation monitoring: monitoring implementation, reformulation comparisons and
reformulation impacts on nutrient intakes [36]
This report will provide best practices at the European level, in terms of reformulations with theirs impacts of nutrient
intakes
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
M5.1 Dissemination
Dissemination workshop on
MS17 workshop on 1st snapshot 11 - ANSES 1
1st snapshot results
results
M5.2 List of the priority food List of the priority food
MS18 11 - ANSES 9
groups groups
M5.3 Launch of the first Launch of the first snapshot
MS19 11 - ANSES 10
snapshot and guideline test and guideline test
M5.4 Launch of the batch 1 of Launch of the batch 1 of the
MS20 11 - ANSES 14
the second snapshot second snapshot
M5.5 Launch of the batch 2 of Launch of the batch 2 of the
MS21 11 - ANSES 22
the second snapshot second snapshot
M5.6 Preparatory trainings
Preparatory trainings for data
MS22 for data collection and 11 - ANSES 22
collection and encoding
encoding
Page 32 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Work package number 9 WP6 Lead beneficiary 10 15 - DoH
Best practices in reducing marketing of unhealthy food products to children and
Work package title
adolescents
Start month 1 End month 36
Objectives
The objective of WP 6 is to explore, develop and share, within participating countries, the best practices on how to
implement effective policies to reduce marketing of unhealthy food products (food and non-alcoholic beverages) to
children (up to 18 years). Harmonized monitoring and implementation tools will be developed, together with an EU
Framework for Action on Best Practises that can be implemented across participating MS via the EU High Level Group
on Nutrition and Physical Activity, so that MS can adapt and replicate and report progress annually.
Steering Group on Prevention and Promotion will also be informed on the developments.
The EU Framework for Action will focus on implementation and monitoring actions that are transferrable across MSs
including codes of practice, designed protocols and tools to monitor unhealthy food marketing to children and inform
compliance with the Framework, together with a key focus on digital marketing. The approaches to reducing unhealthy
food marketing to children will be considered using a health inequalities lens to guard against no widening of the socio-
economic gap.
Work Package 6, together with WP5 and WP7, has at its core changing the European food environment by reducing
marketing unhealthy food products to children, to help halt and reduce the increase in childhood obesity as outlined
in the EU Childhood Obesity Action Plan. Achieving this will contribute towards a healthier EU workforce in future
generations.
Specific objectives of WP 6 are the following:
To support the establishment of the HLG-NPA subgroup on reducing marketing foods to children, supported by external
expert group (composed of the key health EU, WHO and other sectors experts in the field of reducing marketing of
unhealthy foods to children) and MS national intersectoral working groups with key stakeholders and experts in the field
of reducing marketing of unhealthy foods to children. A national intersectoral working group with key stakeholders on
marketing unhealthy food products to children from the health and other sectors are foreseen in participating countries.
To share and test best practices of implemented actions to reduce unhealthy food marketing to children at the EU level
and reduce children to the marketing of high fat, salt and sugar (HFSS) foods.
To harmonise the EU MSs approach in transposition of the new Audio-Visual Media Services Directive (AVMSD).
To develop a code of practices to reduce marketing of unhealthy food to children.
To develop, test and adapt protocols to monitor unhealthy food marketing to children with a particular focus on digital
marketing and within an approach to address health inequalities.
To deliver an EU Framework for Action of implementable best practices to reduce unhealthy food marketing to children.
This EU Framework will provide guidance for policy implementation at national level to support the adoption of the
best practices across EU MS, with recommendations for further EU and national measures.
Description of work and role of partners
WP6 - Best practices in reducing marketing of unhealthy food products to children and adolescents [Months:
1-36]
DoH, NIJZ, BMASGK, SCIENSANO, MCA, NCPHA, CIPH, MoH CY, MoSA, THL, ANSES, ICH, CDPC, LR
SAM, DGS, NIPH, IPHS
Task 6.1: Establishment of the EU Expert Group and national intersectoral working groups.
Task Leader: DoH, Ireland and DGS, Portugal., Participating partners: ICH, SCIENSANO, BMASGK, CDPC, MCA,
PHI-FBH, PHI-RS, NIPH, NIJZ, CHDR, MoH CY, CIPH, MoSA, NIHD, THL, LR SAM
Collaborating partners: WHO, OECD, JRC
An EU Expert Group will be established which will support a sub group of the EU HLG on Nutrition and Physical
Activity. Expert group will be composed of the key EU and WHO health experts and other sectoral experts in the
field of reducing marketing of unhealthy foods to children, linked with WP4. Other sectors will include DG AGRI,
DG CONNECT, DG Internal Market, Industry, Entrepreneurship and SMEs and others. Leading experts on digital
marketing and social inequalities will also be included as well as representatives from the JRC, WHO, OECD and MS
with experiences of implementation actions in this area.
Page 33 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
The EU Expert Group of HLG-NPA subgroup will identify effective actions on the best practices to reduce unhealthy
food marketing to children, in particular, MSs experiences on digital marketing. The recommendations from this EU
Expert Group will provide EU added value for the development of WP tasks on transposing the new AVMSD and on
the developing an EU harmonised and comprehensive monitoring protocol for reducing unhealthy food marketing to
children.
A national intersectoral working group will be established in participating MSs. The main tasks of each national
intersectoral working group will be to analyse and discuss the adaptation of the transposition of the new AVMSD
and the implementation of the EU harmonised monitoring protocol for reducing unhealthy food marketing to children.
Successful MS actions will form the basis for the EU Framework for Action on reducing unhealthy food marketing
to children, a key deliverable for this WP. The intersectoral working group will have public health as its core agenda.
Regular meetings, at least twice a year, will be convened and the outcome presented at the national stakeholder
workshops, linked with WP 2.
The EU Expert Group will support and guide the national intersectoral working groups in the implementation of each
task of this WP, allowing participating MSs to test or pilot protocols and tools. MSs will feed back important data to the
EU Expert Group to support the development of the EU Framework for Action on reducing unhealthy food marketing
to children.
The EU framework on reducing marketing of unhealthy food products to children of HLG-NPA can be taken forward
by MS following the end of the Joint Action and regular reporting on progress will be through the EU HLG on Nutrition
and Physical Activity.
Task 6.2: Mapping of existing regulations and legislation in EU MS
Task Leader: DoH and DGS, Participating partners: ICH, BMASGK, SPF, MOH-FR, IPHS, NIPH, CHDR, MoH CY,
CIPH, THL, LR SAM
Collaborating partners: JRC, WHO (WHO European Marketing Network on reducing marketing pressure to children)
Task 6.2.1. Mapping of existing regulations and legislation in EU MS, linked with WP4, taking into consideration the UN
Convention on the Rights of the Child. This task will deliver a comprehensive mapping of the existing legislation in EU
MS related to reducing unhealthy food marketing to children. The collection of up-to-date data and the information from
in-depth interviews with the national focal points for food marketing to children will provide further recommendations
and additional variables, if relevant, to the JRC report “Food and non-alcoholic beverage marketing to children and
adolescents”. This task will be conducted to complement the work of the WHO European Action Network on Reducing
Marketing Pressure on Children, a network that is led by Portugal. A workshop will be organized to present the state-
of-the-art evidence as well as best practices identified at EU level (examples: Ireland, Slovenia and Portugal).
Task 6.2.2. Mapping of existing evidence on the exposure extent and nature of children to marketing of HFSS using
the WHO Europe nutrient profile model. A selected overview of the existing data on the extent and nature of food
marketing to children will be prepared, linking with research groups and EU projects working in this area, such as data
obtained by WHO expert groups, CHRODIS Joint Action; the EU Study on the exposure of children to linear, non-
linear and online marketing of foods high in fat, salt or sugar; the JRC review on marketing practices (Food and non-
alcoholic beverage marketing to children and adolescents) as well as data obtained by INFORMAS protocol and other
appropriate EU projects such as STOP project.
Task 6.3: Implementation of the transposition of the new Audio-visual Media Services Directive (AVMSD)
Task Leader: DoH, DGS and NIJZ, Participating partners: ICH, CDPC, SPF, MOH-FR, NIPH, NIJZ, CHDR, MoH CY,
CIPH, MoSA, NIHD, THL, LR SAM
Collaborating partner: WHO
Task 6.3.1. Harmonisation of the EU MSs approach based on the transposition of the new AVMSD to national contexts
The recent revision of the AVMSD encourages the EU MS to develop self and co-regulatory codes of practice regarding
inappropriate audio-visual commercial communications to reduce children’s exposure to unhealthy food. EU MS have
to transpose the AVMSD into national legislation. In the WP6, an EU harmonised protocol with recommendations for
that transposition of the AVMSD will be developed and will include a proposal for an EU harmonised nutrient profile
model, based on the WHO nutrient profile model (as identified in the AVMSD) will be developed, tested or piloted by
the participating MSs. The EU harmonised nutrient profile model will be used to identify foods which may and may
not be marketed to children. to
The model may also be used for codes of practice on reducing the marketing of unhealthy food to children
Task 6.3.1.1 Develop the guidance for an EU harmonised nutrient profile model for the identification of foods not
permitted to be marketed to children.
The development of the EU harmonised nutrient profile model for the identification of foods not permitted to be
marketed to children will be based on the WHO Europe nutrient profile model, with national adaptations if required. The
country experiences of Slovenia and Portugal in the adaptation of the WHO Europe Nutrient Profile Model to national
Page 34 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
contexts will provide peer support in the testing of this model in the participating MS. A workshop led by Portugal and
Slovenia will be organized for the MS to share their experiences on using the WHO nutrient profiling model.
Task 6.3.2 Support the national stakeholder dialogues in the implementation process of the AVMSD. Information
collected by the STOP project, which identifies the positions of different stakeholder groups towards the marketing of
unhealthy foods to children and possible measures for consideration will be used to inform this process. A workshop
to guide the interested MSs will be organized to present these country experiences and the data obtained by the STOP
project and other sources. The aim of this task will be to provide stakeholder understanding and support to the AVMSD
implementation process in terms of reducing unhealthy food marketing to children.
Task 6.4: Development of an EU-wide harmonised and comprehensive monitoring protocol for reducing unhealthy food
marketing to children.
Task Leader: DoH and THL, Participating partners: ICH, SCIENSANO, BMASGK, SPF, IPHS, CDPC, MCA, PHI-
FBH, PHI-RS, MOH-FR, NIPH, NIJZ, CHDR, MoH CY, NCPHA, CIPH, THL, DGS
Collaborating partners: WHO, OECD
Task 6.4.1. Review existing protocols to monitor unhealthy food marketing to children. This task will review existing
protocols to monitor the marketing of unhealthy food to children. These include the Nordic monitoring protocol
(Monitoring Food Marketing to Children – a joint Nordic monitoring protocol for marketing of foods and beverages
high in fat, salt and sugar (HFSS) towards children and young people); the INFORMAS approach; and the WHO
CLICK Monitoring framework – Monitoring and Restricting Digital Marketing of Unhealthy Products to Children and
Adolescents.
Task 6.4.2 Protocols and identification of sources of data for each participating MS will be explored and reported. The
JRC food database will support the monitoring protocol for reducing unhealthy food marketing to children by providing
the data on food restricted for marketing.
Task 6.4.3. Develop a proposal for an EU wide optimal protocol drawing on features of the above-mentioned protocols
with recommendations for the EU level and national implementation. The main objective of this task is to develop a
comprehensive approach to monitor marketing of unhealthy food to children. This comprehensive approach will take
into account the different channels that are used for marketing activities and will be based on the existing protocols in
this field, as described in 6.4.1.
The EU harmonised monitoring protocol for unhealthy food marketing to children and adolescents will be tested in
the participating MSs. The leaders of this task, as well as, some of the participating partners already have experience
with these monitoring tools. A pilot studies to test the CLICK tool are planned within the scope of WHO activities in
Slovenia, Finland and Portugal and the learnings will be shared with other MSs
Task 6.4.4 Knowledge capacity building among MS, to implement the monitoring protocol. A Workshop will be
organized to provide assistance to participating EU MS in the implementation of the EU harmonised monitoring protocol
for reducing unhealthy food marketing to children. This workshop will be led by the Nordic colleagues who developed
the Nordic monitoring protocol and will have the support of the WHO.
An EU WHO recognised subcontractor will work on tasks 6.4 and 6.5 and will support the development and
implementation of the monitoring protocols and support their implementation in the broader EU context. Traditional
media as well as digital media will be addressed and media literacy of children evaluated where possible. The
subcontractor will support the development of the codes of practice in the interested MS. The subcontractor will be
subcontracted by one of the Irish Affiliated Entities.
Task 6.5 Guidance for regulatory and voluntary codes of practice.
Task Leader: DoH, DGS, Participating partners: ICH, SCIENSANO, BMASGK, SPF, IPHS, MCA, PHI-FBH, PHI-
RS, MOH-FR, CHDR, FCNAUP, MoH CY, MoSA, NIHD, THL, LR SAM
Collaborating partner: JRC
Task 6.5.1. Develop guidance for codes of practice on reducing unhealthy food marketing to children. Regulatory codes
from Ireland, Slovenia and Portugal on broadcast media will be reviewed and used as guidance for participating MSs.
The JRC toolkit will be included as Technical guidance in form of a checklist of the main aspects to be covered in codes
of practice and an inventory of specific actions will be developed. The guidance will use the WHO NPM to identify
unhealthy foods that should not be advertised to children.
Task 6.5.2. Member States assistance for the implementation of codes of practice for non-broadcast media and
advertising of food and non-alcoholic beverages, including sponsorship and retail product placement and other practices.
A workshop led by Ireland who has developed Codes on these will be organized to help participating MSs develop
and implement codes of practice to reduce unhealthy food marketing to children. The goal will be to have participating
MSs integrate relevant best practises into their national policies to reduce marketing of unhealthy foods to children.
A guidance document that can be used for the food industry EU-wide will be prepared, together with an outline on
governance and monitoring. A document to encourage food companies and partner organisations to sign up to the Codes
will be developed and a register of signatories will be maintained and published by the national monitoring bodies.
Page 35 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Task 6.6 Adaptation of the monitoring tools to address health inequalities
Task Leader: DGS; Participating partners: ICH, SCIENSANO, IPHS, NIPH, FCNAUP, NIJZ, MoH CY, CIPH, THL
Collaborating partner: WHO
Task 6.6.1 Review of the health impact assessment of interventions to reduce unhealthy food marketing to children,
describing the effectiveness of interventions and approaches differentiated by socio-economic variables. Portugal will
lead on reviewing a health impact assessment to inform and validate such adaptations of interventions to reduce
marketing of unhealthy food to children. A review of the literature will be conducted on the impact and efficiency of
current policies and actions with a focus on health inequalities. Given the lack of evidence available on the effectiveness
of interventions to tackle social inequalities, as shown by the EU Health Equity Pilot Project, interviews with experts
will be performed.
Task 6.6.2 Adaptation of the monitoring tools to address health inequalities will be reviewed. The main goal will be
to help ensure that implementing these tools will not increase the health gap between advantaged and disadvantaged
communities. This task will use experiences from previous Joint Actions, MS experiences and EU projects in this field
(JAHEE JA and EU Health Equity Pilot Project (HEPP)). Systematic reviews of interventions to promote healthy eating
to identify whether impacts differ by socioeconomic position will be examined. A report on building social movements
to address health inequalities in the area of reducing the marketing of unhealthy food to children will be produced.
Task 6.7 EU harmonised Framework for Action on reducing unhealthy food marketing to children
The successfully identified protocols for the implementation of effective policies to reduce unhealthy food marketing
to children will be consolidated in an EU Framework for action that intend to be transferred across EU MS through the
EU High Level Group on Nutrition and Physical Activity. This Framework for Action will provide guidance for policy
implementation measures across the EU MS and will allow for regular updating through the EU HLG following the
end of this Joint Action facilitating ongoing sustainability.
Participation per Partner
Partner number and short name WP6 effort
1 - NIJZ 23.00
2 - BMASGK 9.00
3 - SCIENSANO 12.00
4 - MCA 14.00
5 - NCPHA 3.50
6 - CIPH 14.00
7 - MoH CY 18.00
9 - MoSA 4.00
10 - THL 20.00
11 - ANSES 20.00
13 - ICH 20.00
15 - DoH 30.00
17 - CDPC 19.00
18 - LR SAM 4.00
22 - DGS 63.00
23 - NIPH 13.00
24 - IPHS 5.00
Total 291.50
Page 36 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
D6.1 An EU harmonised
approach using the WHO
nutrient profile model
D6.1 15 - DoH Report Public 9
for the identification of
foods not permitted for
marketing to children
D6.2 Technical guidance
D6.2 15 - DoH Report Public 18
for codes of practice
D6.3 Report on Pilot
EU–wide harmonised
and comprehensive
monitoring protocol
D6.3 15 - DoH Report Public 32
for unhealthy food
marketing to children,
with a particular focus on
digital marketing
D6.4 A harmonised EU
Framework for Action on
reducing unhealthy food
D6.4 15 - DoH Report Public 36
marketing to children,
within the scope of HLG-
N&PA
Description of deliverables
D6.1 An EU harmonised approach using the WHO nutrient profile model for the identification of foods not permitted
for marketing to children (M9)
D6.2 Technical Guidance for codes of practice (M18)
D6.3 Report on pilot EU-wide harmonised and comprehensive monitoring protocol for unhealthy food marketing to
children, with a particular focus on digital marketing (M32)
D6.4 A harmonised EU Framework for Action on reducing unhealthy food marketing to children, within the scope of
HLG-N&PA (M36)
D6.1 : D6.1 An EU harmonised approach using the WHO nutrient profile model for the identification of foods not
permitted for marketing to children [9]
The nutrient profile model will help EU MS to have a harmonized approach and it will be tested in some participant
MS.
D6.2 : D6.2 Technical guidance for codes of practice [18]
These guidelines will help EU MS in developing codes of practices to control food marketing to children
D6.3 : D6.3 Report on Pilot EU–wide harmonised and comprehensive monitoring protocol for unhealthy food
marketing to children, with a particular focus on digital marketing [32]
The monitoring protocol for unhealthy food marketing to children will be tested and piloted in several participant MS.
This report will provide best-practices for all EU MS on how to monitor unhealthy food marketing to children.
D6.4 : D6.4 A harmonised EU Framework for Action on reducing unhealthy food marketing to children, within the
scope of HLG-N&PA [36]
The EU harmonised Framework for Action on reducing food marketing to children will help all EU MS to implement
a strategy to reduce food marketing to children
Page 37 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
M6.1 Establishment of the EU Establishment of the EU
MS23 Expert Group and national 15 - DoH 6 Expert Group and national
intersectoral working group intersectoral working group
M6.2 A workshop on how A workshop on how to use,
to use, adapt and implement adapt and implement the EU
MS24 15 - DoH 9
the EU harmonised nutrient harmonised nutrient profile
profile model organised model organised
M6.3 Regulation and Regulation and legislation
MS25 15 - DoH 12
legislation mapping report mapping report
M6.4 A workshop on how A workshop on how to
to implement codes of implement codes of practices
MS26 practices to reduce unhealthy 15 - DoH 18 to reduce unhealthy food
food marketing to children marketing to children
organised organised
M6.5 A workshop to A workshop to implement
implement the EU protocol the EU protocol to monitor
MS27 15 - DoH 20
to monitor food marketing to food marketing to children
children organised organised
Page 38 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Work package number 9 WP7 Lead beneficiary 10 1 - NIJZ
Work package title Public procurement of food in public institutions –a pilot EU approach
Start month 1 End month 36
Objectives
The overall objective of WP 7 is to contribute to the higher quality of menus, by assuring transparent quality of the
procured foods, in the (selected) public institutions in the interested MS, and in the long-term, at the national/regional
levels and at the EU level. WP7 activities contribute to the Best-ReMaP long-term overall objective to improve food
choices for children, thus adding to increased healthy life years at the MS and EU level.
Specific objectives of the WP 7 are as following:
To support the establishment of the intersectoral working group for the public procurement of foods in public institutions,
in the participating MS,
To increase the understanding, knowledge and skills regarding public procurement of food/food products in selected
public institutions,
To enable more choice of quality food stuffs for balanced menus in selected public institutions, from at least one type
of public institution (types of public institutions: kindergartens, schools, retirement homes, hospitals), by piloting the
Catalogue of foods in the public procurement procedure,
To recommend further institutionalised implementation of the public procurement procedures for foods, based on quality
standards, in EU MS.
Description of work and role of partners
WP7 - Public procurement of food in public institutions –a pilot EU approach [Months: 1-36]
NIJZ, BMASGK, MCA, NCPHA, DVFA, THL, ICH, SU, MFH, SUM
Task 7.1 EU AND NATIONAL LEGISLATIVE FRAME AND INTERSECTORAL COOPERATION
Task Leader: NIJZ, Participating partners: BMASGK, GOeG, MCA, PHI-FBH, PHI-RS, NCPHA, CPH-MUN, THL,
ICH, SU, MFH, SUM
Task 7.1.1 Overview/applicative situation analyses of the existing EU and national legislation will be prepared, related
to public procurements of foods and recommendations for possible improvements to achieve higher quality menu in
public institutions, based on the Maltese Presidency, JRC report and good practices in the involved MS. Each MS checks
its own part of the legislation, linked to the public procurement and identifies the need for legislative amendments, based
on the outcomes of the national workshops on procurement (task 7.1.3). When all the countries perform an overview
and about the information regarding individual situations in the MS has been compiled, then this data could be grouped
into classifications around procurement and differing school provision/policy contexts.
7.1.2 Relevant sectors and stakeholders for the WP activities, linked with WP2 and WP4, will be identified and the
key motivating drivers/benefits for other sectors to participate will be defined. An EU Expert Group will be established
which will support a sub group of the EU HLG on Nutrition and Physical Activity on public food procurements. Expert
group will be composed of the key EU and WHO health experts and other sectoral experts in the field of public food
procurements in public settings, linked with WP4. Other sectors will include DG AGRI, DG Internal Market, Industry,
Entrepreneurship and SMEs and possible others.
The national/regional inter-sectoral public procurements working group (WG) will be defined and established in each
of the participating MSs, with at least one meeting per year (minimum three overall) and one national workshop per
participating MS. The WG will prepare (1) an indicative overview of the extent of the public procurements, in the
national currency, for all kinds of public institutions at the national/regional level; (2) an overview of the transposed EU
legislation on public procurements and green procurements in the national context (3) an exploratory position on the
possible introduction of the exemption in the national/regional legislative public procurements context, all three points
based on the template prepared with the support of the experiences of a selected WP 7 subcontractor in the field.
One of the major tasks of the inter-sectoral group will be the identification and definition of the institutionalized
sustainable approach – identification of the national/regional/local focal point for the public procurements in public
settings, responsible for the processes and procedures and sustainability of the Catalogue of foods, with definition of
the intersectoral governance and competences, based on the good practice examples.
7.1.3 Organization of a national meeting/workshop on procurement, to define the state of art and plan future steps/define
the process. The workshop will address the following topics:
(1) presentation of the EU legislation in food procurements and green procurements, the Maltese Presidency outcomes
and JRC report, the Slovene legislative solutions in the EU legislative context;
Page 39 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(2) presentation of the state of the art in visited Member States, including non-legal practices; MS status report;
(3) initial presentation of the good practice from Slovenia, other best practices (BPs);
(4) identification of the similarities and differences among different national contexts, relevant for the visited MS;
Preparation of the activity plans for action for the individual MS will be based on the workshop outcomes and will be
supported by a selected WP 7 subcontractor in the field.
7.1.4 National/regional/local focal points (FP) at the national institution(s) will be identified, for the institutionalized
coordination and implementation of the public food procuring activities, linked to the work of WP4. The EU added
value will be exploring the possibility of the national/regional focal points for each participating MS. In year two, the
questionnaire to identify national focal points and to initiate the network will be composed and forwarded to participating
MSs. In case of COVID-19 situation, national/regional/local focal points will be identified through Go to meeting
application (webinar).
Task 7.2 PARTICIPATING INSTITUTIONS AND KNOWLEDGE BUILDING
Task Leader: NIJZ, Participating partners: BMASGK, GOeG, MCA, PHI-FBH, PHI-RS, NCPHA, CPH-MUN, THL,
ICH, SU, MFH
Task 7.2.1 Among all the types of public institutions that procure food at the national/regional levels in the participating
MS (such as kindergartens, schools, retirement homes, hospitals), one or more type(s) of public institutions will be
selected for participation in the action, and within the selected institution type(s), individual institutions (at least five)
will be selected for the implementation of the action.
Task 7.2.2 Knowledge building, knowledge sharing and knowledge transfer in EU MS regarding food procurements
will be provided, developed and implemented by support of a selected WP 7 subcontractor in the field.
Knowledge transfer training(s) workshops (WS) in Slovenia and possibly elsewhere would consist of the following
topics:
- legislative context,
- situation analyses and needs assessment in the specified national /regional public institutions;
- Catalogue of foods and its use in public procurements,
- Composition of the food public template procurement tender.
Three-days training sessions will be organized in year 2, including training of at least two experts for the categorization
and implementation of the categorization of food products, using the piloted tool (Slovene and other adapted tools). An
intensive three full days training is foreseen for all participating countries, including approximately 10 participants per
training. Training materials will be prepared, with the inputs from the field, provided by a selected subcontractor: (1)
development of the training materials based on good practices experiences; (2) testing of the training materials and tools
at the trainings; (3) finalization of the training materials, with the defined training protocol end evaluation templates.
Task 7.3 PILOT PROCUREMENT TOOL AND JOINT PUBLIC TENDER
Task Leader: NIJZ, Participating partners: BMASGK, GoeG, MCA, PHI-FBH, PHI-RS, NCPHA, CPH-MUN, THL,
ICH, SU, MFH
Task 7.3.1 Overview of the available tools in the participating MS will be prepared, with recommendations for
development of the joint pilot English-language Catalogue for selected food groups, with possible adaptation of the
available tools, including the Slovene »Catalogue of foods«.
Task 7.3.2 The national/regional/local pilot study will be developed and implemented, based on the task 7.3.1. outcomes.
A Pilot English-language Catalogue of food products, for selected food groups (minimum one selected food group,
harmonized in the participating MS), will be designed jointly with a selected subcontractor, bringing in practical
experiences from the field work:
(1) food groups for the implementation of the pilot study will be selected, harmonized for all the participating countries
(1st priority – milk and milk products; 2nd priority – bread and bakery products; 3rd priority – meat and meat products);
(2) national or regional market analysis of the harmonized selected food groups will be conducted, to compose at least
one national/regional list(s) of food products, available on the market, relevant for public settings;
nationally specific and approved quality criteria are to be added to the food products on the list (e.g. use of the green
procurement regulation as supportive element to define the procuring distance; labels, allergens, nutritional value, place
of origin, certificates, ...)
to simplify and harmonize the process, Slovenia will provide computerized pilot (prototype) list(s) of relevant food
products, to be translated in the national languages and upgraded; national teams will check the list(s) and supplement
them with the nationally available food products;
(3) national teams will create the national Pilot Catalogues of food products (selected list) and check the produced
catalogue with the national food providers
(4) testing and piloting of the Catalogue of the selected foods, while building the ownership of the MS (exploring the
national/regional specific situation and searching for the specific approaches and solutions)
Page 40 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(5) development of the procurement testing tender and templates, based on the Slovene and other best practices and
JRC work;
Task 7.3.3 Joint execution of public tender, with the implementation practically organized by the selected subcontractor,
with harmonized timing among all the participating MS - one testing public tender executed, for up to three priority
food groups; comparative testing of the Catalogue of foods in participating MS – to demonstrate the functioning of the
Catalogue of foods within different MS and highlight the possible linkages.
The Catalogue of foods contains database with generic or more specific data for different food groups. The generic
database includes all previously known food titles in menus (such as full-fat cottage cheese), subcategories and product
types, which will be then later in the process replaced by the products of choice, entering the menus. When the public
tender is composed,
Task 7.3.4 Development of the approach towards the EU market analysis with the aim to compose the joint EU list of
food products, where relevant, based on the participating MS lists (as mentioned above), with support of a potential
procurement officers network. Joint EU list of food products will be embedded in JRC food database. This will enable
transparent overview of food products and their traceability.
Austria will subcontract external expertise in order to participate in Tasks 7.2 and 7.3, to develop and implement joint
public tender.
Task 7.4 PUBLIC FOOD PROCUREMENTS EVALUATION CRITERIA
Task Leader: NIJZ, Participating partners: BMASGK, GoeG, MCA, PHI-FBH, PHI-RS, NCPHA, CPH-MUN, THL,
ICH, SU
Development of the evaluation criteria, based on the practical experiences and good practices from the field - with the
inputs from the MS, based on the national specificities:
- MS to explore the existing criteria at the national level and develop the national criteria, for the executed public tender;
- comparison of the different criteria in the MS;
- draft recommendation for the harmonization of the criteria at the EU level, with complete digitalization and
transparency, for further steps and potential new funding mechanisms to support implementation of JA outcomes.
Task 7.5 CASE STUDIES
Task Leader: NIJZ, Participating partners: BMASGK, GoeG, MCA, PHI-FBH, PHI-RS, CPH-MUN, THL, ICH, SU
Task 7.5.1. Comparison analyses -case studies (M30 - M36):
- template to describe the process and experiences from the individual MS;
- comparative analyses;
- draft recommendation for the harmonized approach at the EU level, for future steps and projects to be submitted for
funding, all in consultation with a selected subcontractor to develop practical innovative solutions.
Task 7.6 EU harmonised Framework for Action on food procurements in public settings
The successfully developed and implemented pilot protocol for the implementation of public procurement of foods in
public settings will be consolidated in a EU Framework for action for public procurements of foods in public settings
that intend to be transferred across EU MS through the EU High Level Group on Nutrition and Physical Activity. This
Framework for Action will provide guidance for policy implementation measures across the EU MS and will allow for
regular updating through the EU HLG following the end of this Joint Action facilitating ongoing sustainability.
Task 7.7 RECOMMENDATIONS FOR SUSTAINABLE POLICY DEVELOPMENT
Task Leader: NIJZ and ISS, Participating partners: BMASGK, GoeG, MCA, PHI-FBH, PHI-RS, CPH-MUN, THL,
ICH, SU
Task 7.6.1 A roundtable will be organized to present the employed good practices and the pilot approach and provide
the feedback from the MS, possibly at ministerial level, and the European Commission.
Task 7.6.2 Recommendations for further developments of the approach will be provided in line with WP 4, to support
the effective institutionalized implementation of the results and the MS and EU level use. This may be done with a view
of potentially creating a network of public procurement officers.
Sustainability plan for HLG Framework for food procurements work plan will be prepared.
Participation per Partner
Partner number and short name WP7 effort
1 - NIJZ 67.25
2 - BMASGK 27.50
Page 41 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Partner number and short name WP7 effort
4 - MCA 30.00
5 - NCPHA 6.00
8 - DVFA 30.00
10 - THL 30.00
13 - ICH 24.50
14 - SU 30.00
19 - MFH 12.00
21 - SUM 14.00
Total 271.25
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in
Number14
months)17
D7.1 Overview/
applicative situation
D7.1 analyses of the existing 1 - NIJZ Report Public 7
EU and national
legislation
D7.1 Knowledge transfer
D7.2 1 - NIJZ Other Public 22
training(s)
D7.3 Pilot Catalogue of
D7.3 1 - NIJZ Demonstrator Public 32
foods
D7.4 EU harmonised
D7.4 1 - NIJZ Report Public 36
Framework for Action
Description of deliverables
D7.1 Overview/applicative situation analyses of the existing EU and national legislation (M7)
D7.2 Knowledge transfer training(s) (M22)
D7.3 Pilot Catalogue of foods (M32)
D7.4 EU harmonised Framework for Action (M36)
D7.1 : D7.1 Overview/ applicative situation analyses of the existing EU and national legislation [7]
This overview will bring the insights in national legislative frame and sectoral capacities, including identified points
of possible improvements.
D7.2 : D7.1 Knowledge transfer training(s) [22]
Training(s) will involve at least two experts for categorization of food products and implementation of the piloted tool
D7.3 : D7.3 Pilot Catalogue of foods [32]
Pilot Catalogue(s) of food products (selected list) will be tested and piloted in one testing public tender
D7.4 : D7.4 EU harmonised Framework for Action [36]
This Framework for Action will identify key elements of the comprehensive approach towards high quality public
procurements of foods in public settings.
Page 42 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
M7.1 Applicative situation
Applicative situation analyses
analyses with initial
with initial recommendations
recommendations for possible
MS28 1 - NIJZ 7 for possible improvements
improvements for food public
for food public procurement
procurement procedures
procedures prepared
prepared
M7.2 Selection of the public Selection of the public
MS29 institutions type(s) for 1 - NIJZ 15 institutions type(s) for
participation participation
M7.3 Inter-sectoral public Inter-sectoral public
MS30 procurements working group 1 - NIJZ 16 procurements working group
workshop(s) workshop(s)
M7.4 Pilot protocol
MS31 1 - NIJZ 26 Pilot protocol development
development
M7.5 Execution of a joint Execution of a joint public
MS32 1 - NIJZ 30
public tender tender
M7.6 Procurement evaluation Procurement evaluation
MS33 1 - NIJZ 34
criteria criteria
Page 43 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1.3.4. WT4 List of milestones
Due
Milestone WP
Milestone title Lead beneficiary Date (in Means of verification
number18 number9
months)17
M 1.1 Best-ReMaP
Best-ReMaP Kick-off
MS1 Kick-off Meeting – SC, WP1 1 - NIJZ 1
Meeting – SC, GA
GA
M 1.2 Finalised Best-
ReMaP Project Policy Finalised Best-ReMaP Project
MS2 WP1 1 - NIJZ 4
and Financial Policy Policy and Financial Policy
work plans
M 1.3 Signature
Signature of Best-ReMaP
MS3 of Best-ReMaP WP1 1 - NIJZ 6
consortium agreement
consortium agreement
M 1.4 Mid-term Mid-term conference
MS4 WP1 1 - NIJZ 14
conference executed executed
M1.5 Delivery of the
MS5 WP1 1 - NIJZ 18 Interim Report
Interim Report
M1.6 Final conference
MS6 WP1 1 - NIJZ 36 Final conference executed
executed
MS7 M1.7 Final Report WP1 1 - NIJZ 36 Delivery of Final Report
M2.1 6th Newsletter
MS8 WP2 14 - SU 35 6th Newsletter issued
issued
M2.2 Webinars to
Webinars to disseminate WP
MS9 disseminate WP results WP2 14 - SU 36
results completed
completed
M3.1 Selection of Selection of external
MS10 WP3 10 - THL 1
external evaluators evaluators
M3.2 First meeting
First meeting with the
MS11 with the external WP3 10 - THL 4
external evaluators
evaluators
M3.3 Completed Completed outcome
MS12 outcome evaluation WP3 10 - THL 36 evaluation with external
with external evaluators evaluators
M4.1 At least 6 semi-
At least 6 semi-structured
structured interviews
MS13 WP4 16 - ISS 12 interviews have been carried
have been carried out in
out in relation to Task 4.1
relation to Task 4.1
M4.1 At least 3 semi- At least 3 semi-structured
structured interviews interviews have been
MS14 WP4 16 - ISS 18
have been implemented implemented in relation to
in relation to Task 4.1 Task 4.1
M4.3 JRC implements JRC implements food
MS15 WP4 16 - ISS 34
food database database
M4.4 Policy dialogues
MS16 WP4 16 - ISS 36 Policy dialogues completed
completed
Page 44 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Due
Milestone WP
Milestone title Lead beneficiary Date (in Means of verification
number18 number9
months)17
M5.1 Dissemination
Dissemination workshop on
MS17 workshop on 1st WP5 11 - ANSES 1
1st snapshot results
snapshot results
M5.2 List of the List of the priority food
MS18 WP5 11 - ANSES 9
priority food groups groups
M5.3 Launch of the
Launch of the first snapshot
MS19 first snapshot and WP5 11 - ANSES 10
and guideline test
guideline test
M5.4 Launch of the
Launch of the batch 1 of the
MS20 batch 1 of the second WP5 11 - ANSES 14
second snapshot
snapshot
M5.5 Launch of the
Launch of the batch 2 of the
MS21 batch 2 of the second WP5 11 - ANSES 22
second snapshot
snapshot
M5.6 Preparatory
Preparatory trainings for data
MS22 trainings for data WP5 11 - ANSES 22
collection and encoding
collection and encoding
M6.1 Establishment
of the EU Expert Establishment of the EU
MS23 Group and national WP6 15 - DoH 6 Expert Group and national
intersectoral working intersectoral working group
group
M6.2 A workshop on
A workshop on how to use,
how to use, adapt and
adapt and implement the EU
MS24 implement the EU WP6 15 - DoH 9
harmonised nutrient profile
harmonised nutrient
model organised
profile model organised
M6.3 Regulation and
Regulation and legislation
MS25 legislation mapping WP6 15 - DoH 12
mapping report
report
M6.4 A workshop
A workshop on how to
on how to implement
implement codes of practices
codes of practices to
MS26 WP6 15 - DoH 18 to reduce unhealthy food
reduce unhealthy food
marketing to children
marketing to children
organised
organised
M6.5 A workshop to
A workshop to implement
implement the EU
the EU protocol to monitor
MS27 protocol to monitor WP6 15 - DoH 20
food marketing to children
food marketing to
organised
children organised
M7.1 Applicative
Applicative situation analyses
situation analyses
with initial recommendations
with initial
MS28 WP7 1 - NIJZ 7 for possible improvements
recommendations for
for food public procurement
possible improvements
procedures prepared
for food public
Page 45 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Due
Milestone WP
Milestone title Lead beneficiary Date (in Means of verification
number18 number9
months)17
procurement
procedures prepared
M7.2 Selection of Selection of the public
MS29 the public institutions WP7 1 - NIJZ 15 institutions type(s) for
type(s) for participation participation
M7.3 Inter-sectoral
Inter-sectoral public
public procurements
MS30 WP7 1 - NIJZ 16 procurements working group
working group
workshop(s)
workshop(s)
M7.4 Pilot protocol
MS31 WP7 1 - NIJZ 26 Pilot protocol development
development
M7.5 Execution of a Execution of a joint public
MS32 WP7 1 - NIJZ 30
joint public tender tender
M7.6 Procurement Procurement evaluation
MS33 WP7 1 - NIJZ 34
evaluation criteria criteria
Page 46 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1.3.5. WT5 Critical Implementation risks and mitigation actions
Risk
Description of risk WP Number Proposed risk-mitigation measures
number
AVOID: WP 1 will work together with WP 3 to
WP 1 - mgmt. and meeting evaluate the mgmt. and meeting structure through
1 structure do not fulfil the WP1 regular surveys throughout the entire duration of
anticipated objectives. the JA and adapt structures, meeting schedules if
necessary.
WP 1 – Associated AVOID: A detailed mailing list of contact persons
Partners could be passive will be put in place with at least 5+ contact
in communication with the persons per organisation, ensuring that someone
2 Project Management Team WP1 is always on hand to answer important requests.
(PMT), could offer little The PMT will communicate with partners through
feedback and not respond to various comm. channels (telephone, face to face
important requests. meetings along with e-mail).
AVOID: Preparation for the interim and financial
reports will begin at least 2 months before
WP 1 – Associated Partners
the reporting deadline. Reporting workshops
and WPL will not submit
will be organised to educate the partners about
3 necessary reporting materials WP1
preparation of the reports. Templates will be
on time for the interim and
prepared to minimize the amount of work per
financial reports.
partner. Bilateral webinars will be organised for
reporting instructions.
AVOID: Regular 6 monthly reports will be
gathered by the PMT to monitor financial
WP 1 – Associated Partners expenditure and propose redistribution of budgets
will not adhere to planned if necessary. Bilateral communication will be
4 WP1
budget and will under or over held between the PMT and individual partners
spend. regarding expenditure, partner specific feedback
will be given on budgets following every 6 month
report.
AVOID: Deliverables will be tracked by each
WPL and by the PMT, who will discuss the status
WP 1 – Associated Partners of all planned deliverables in the reporting period
will not fulfil their planned at SC meetings. 1 month prior to the delivery
obligations, will not deliver of the milestone/deliverable the PMT will be in
5 WP1
planned outputs, or will do touch with the WP about the status, helping to
so with significant delay, find a solution if a delay is expected. Real-time
changes to consortium. consortium changes will be monitored for possible
amendments, tasks will then be re-shifted between
partners.
AVOID: The JA faces a volatile situation
regarding potential future waves of the COVID-19
epidemic in the EU. Care will be taken by
the PMT and WPL to adhere to the meeting
schedule, replacing face to face meeting with
WP 1 – COVID-19 epidemic
online meetings throughout all WPs, if travel
6 to impact successful WP1
restrictions are in place. Careful monitoring
implementation of the JA
will be carried out in conjunction with WP 4
to monitor the feasibility of implementation of
proposed measures in food policy in order to
offset any potential non-uptake/compliance within
MS, in event of economic recession/restructuring
Page 47 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Risk
Description of risk WP Number Proposed risk-mitigation measures
number
of funds for priority funding to COVID-19
measures.
WP2 - Some core topics
of the JA may prove to be
highly sensitive and even
political issues, especially AVOID: The content of such communication
food reformulation and food as well as the communication channels will be
7 WP2
marketing that may draw a under tight control to avoid any potential clash of
wide spectrum of feedback interests on social media.
from the industrial and
healthcare stakeholders as
well as the lay audience.
AVOID: Local Stakeholder Forums have
WP2 - Associated Partners
been planned as a mandatory activity for each
will not be active in
Competent Authority, with budgets allocated
8 disseminating Best - ReMaP WP2
for this activity. Partners will be encouraged to
content in local and national
organise these at each GA meeting and by e-mail
networks.
communication.
WP2 - Partners may not AVOID: The Dissemination Team will be in
be active in notifying constant contact with the PMT and WPLs and will
9 Dissemination Team of WP2 attend key meetings in order to proactively follow
content for the newsletter and WP developments, which will be communicated
website update. by various channels.
AVOID: Different events will be tailored to
different groups of stakeholders in order to
WP 2- Specific stakeholders
efficiently promote their inclusion. Each WP will
may be unsatisfied with their
10 WP2 include their own stakeholders in working groups.
level of inclusion in the JA or
Stakeholders can attend PDMF or national Local
with developments in WP.
Stakeholder Forums to discuss specific issues
face-to-face.
WP 2 – The successful
distribution of the 2
promotional movies to public AVOID: Ministries will be contacted well in
schools in the EU member advance. Person(s) with the right network and
11 WP2
states is dependent on the position will be identified and involved in the
support of the countries’ distribution of the films.
Ministries of Health and/or
Education.
AVOID: Many partners in the JA are experienced
in JA-work and therefore familiar with the
WP3 – The partners are not evaluation procedures. WP-leaders are involved
keen to participate in data with the evaluation work together with the
12 WP3
collection necessary for the WP3, and thereby increasing the likelihood of
evaluation. acceptance and motivation to participate in the
work related to the evaluation. Regular reminders
will be made.
REDUCE: The workflow related to the evaluation
WP3 - Changes in key
is created and documented so that all the
13 personnel involved in the WP3
information related to the evaluation are readily
evaluation.
available within THL. It is the responsibility of
Page 48 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Risk
Description of risk WP Number Proposed risk-mitigation measures
number
THL to recruit suitable replacements in the event
of changes in the personnel.
AVOID: The organization leading the WP3, THL,
is also participating in the work of WP5, WP6
and WP7. To minimize the risk of possible bias,
the key personnel at THL participating in the
WP3 - Conflict of interest
14 WP3 work of WP3 (including the WP3 leader) are not
related to the evaluation.
participating in the work of the other WPs. In
addition, an external evaluation will be conducted
by subcontracting two independent external
evaluators.
WP4 - Low participation by REDUCE: Sending timely invitation for the
policy makers and decision events with a letter explaining the JA and
15 makers from Member States WP4 the relevance of the policies to be transferred
at the Policy Dialogue Upgrading the invitation through direct phone
Events. calls, reminders, personal contacts
REDUCE: Define with European actors (High
WP4- Low sustainable Level Group, JRC, DG santé, possible Food
impact of Best-ReMaP system indicators in EU semester) a European
16 WP4
outcomes on National governance for Nutrition and a European
Policies Healthy food supply for children to assure real
improvements on national nutrition policies.
WP4 – Delayed finalization
of the first version of the
“Considerations for Member REDUCE: Definition of intermediate steps in the
17 WP4
States on How to Integrate drafting of the report with time due
the Best-ReMaP Outcomes
into National Policies”.
WP4 - Not enough
REDUCE: Frequent contacts with the other WP
18 collaboration with the leaders WP4
leaders via call conference and e-mail
of the core WPs
SHARE: In link with the WP4, prioritise
involvement of national decision-makers,
WP5 - Implementation of European Commission, CHAFEA, JRC. Several
19 WP5
tools not sustainable. meetings, conferences and workshops are planned
during the JA to address sustainability. The JRC
food database must be available for the EU MS.
AVOID: The participants of the JA are well
informed and many involved in other European
WP5 – Lack of synergy
projects, this will be monitored at SC and GA
between Best-ReMaP and
meetings. The JRC food database must be
20 other European projects & WP5
compatible with the JANPA methodology and
bodies (EUREMO, OMS,
the Oqali food classification. Data produced
JRC).
during the Euremo must be available (M24) and
compatible with the Oqali food classification.
AVOID: Evidence based policy making strategies
WP6 – AVMSD transposition
to coherently raise interest of relevant sectors to
21 not a priority at the national WP6
participate; engagement with national regulators;
level
WHO supportive role employed.
Page 49 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Risk
Description of risk WP Number Proposed risk-mitigation measures
number
MITIGATE: Digital marketing is a new
WP6 – Monitoring of digital
phenomenon; additional developing evidence will
marketing rather unknown,
22 WP6 be studied. Experiences of non-EU countries and
demanding and very complex
WHO taken on board; internal development of
issue
measurement of follow up approaches
WP7 – Lack of common
understanding of the action AVOID: Additional efforts will be put into the
23 and knowledge on the WP7 trainings and workshops, WP leaders will consider
legislative requirements additional webinars with the individual MS.
among different sectors
AVOID: The activity and the training are to be
WP7 – Lack of interest to explored, developed and implemented and the
24 join the activities and the WP7 interest raised among MS participants through
training. timely engagement, promotion and inclusion in
WP tasks.
MITIGATE: Types of the engaged institutions will
WP7 - Selection of the be additionally explored and defined, taking into
25 WP7
institutions type. account national structures and context so as to be
better employed
MITIGATE: Procurement officers participating
WP7 - Identification of the in the JA should explicitly support individual MS
26 WP7
institutionalized focal point. in finding the institutionalized approach in the
national/regional context.
Page 50 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1.3.6. WT6 Summary of project effort in person-months
Total Person/Months
WP1 WP2 WP3 WP4 WP5 WP6 WP7
per Participant
1 - NIJZ 103 9 5 13.50 17 23 67.25 237.75
2 - BMASGK 2 2 2 2 17 9 27.50 61.50
· GOeG 0 0 0 0 0 0 0 0
· AGES 0 0 0 0 0 0 0 0
3 - SCIENSANO 1 1 1 1 28 12 0 44
4 - MCA 2 2 2 2 14.50 14 30 66.50
· PHI-FBH 0 0 0 0 0 0 0 0
· PHI-RS 0 0 0 0 0 0 0 0
5 - NCPHA 1 1 1 1 14 3.50 6 27.50
6 - CIPH 1 1 1 1 14 14 0 32
7 - MoH CY 1 1 1 1 12 18 0 34
8 - DVFA 1.50 1.50 1.50 1.50 12 0 30 48
· CPH-MUN 0 0 0 0 0 0 0 0
9 - MoSA 1.50 1.50 1.50 1.50 23 4 0 33
· NIHD 0 0 0 0 0 0 0 0
10 - THL 2 2 50 2 15 20 30 121
11 - ANSES 3 3 3 3.50 97 20 0 129.50
· MoH-FR 0 0 0 0 0 0 0 0
· SPF 0 0 0 0 0 0 0 0
12 - MRI 1 1 1 1 23 0 0 27
13 - ICH 1 1 1 1 17 20 24.50 65.50
14 - SU 2.50 71.50 2.50 2.50 19 0 30 128
· NIPN 0 0 0 0 0 0 0 0
Page 51 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Total Person/Months
WP1 WP2 WP3 WP4 WP5 WP6 WP7
per Participant
15 - DoH 3 3 3 3 23 30 0 65
· CHDR 0 0 0 0 0 0 0 0
· FSAI 0 0 0 0 0 0 0 0
16 - ISS 2 2 2 38 13 0 0 57
17 - CDPC 1 1 1 1 0 19 0 23
18 - LR SAM 1 1 1 1 0 4 0 8
19 - MFH 1 1 1 1 17 0 12 33
20 - RIVM 1 1 1 1 7 0 0 11
21 - SUM 1 1 1 1 13 0 14 31
22 - DGS 2.50 2.50 2.50 2.50 14 63 0 87
· FCNAUP 0 0 0 0 0 0 0 0
23 - NIPH 1 1 1 1 17 13 0 34
24 - IPHS 1 1 1 1 0 5 0 9
Total Person/Months 138 113 88 85 426.50 291.50 271.25 1413.25
Page 52 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1.3.7. WT7 Tentative schedule of project reviews
Review Tentative Planned venue
Comments, if any
number 19 timing of review
RV1 18 Luxembourg/ Remote Meetings To review the interim report
Page 53 of 53
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1. Project number
The project number has been assigned by the Commission as the unique identifier for your project. It cannot be
changed. The project number should appear on each page of the grant agreement preparation documents (part A
and part B) to prevent errors during its handling.
2. Project acronym
Use the project acronym as given in the submitted proposal. It can generally not be changed. The same acronym should
appear on each page of the grant agreement preparation documents (part A and part B) to prevent errors during its
handling.
3. Project title
Use the title (preferably no longer than 200 characters) as indicated in the submitted proposal. Minor corrections are
possible if agreed during the preparation of the grant agreement.
4. Starting date
Unless a specific (fixed) starting date is duly justified and agreed upon during the preparation of the Grant Agreement,
the project will start on the first day of the month following the entry into force of the Grant Agreement (NB : entry into
force = signature by the Agency). Please note that if a fixed starting date is used, you will be required to provide a written
justification.
5. Duration
Insert the duration of the project in full months.
6. Call (part) identifier
The Call (part) identifier is the reference number given in the call or part of the call you were addressing, as indicated
in the publication of the call in the Official Journal of the European Union. You have to use the identifier given by the
Commission in the letter inviting to prepare the grant agreement.
7. Abstract
8. Project Entry Month
The month at which the participant joined the consortium, month 1 marking the start date of the project, and all other start
dates being relative to this start date.
9. Work Package number
Work package number: WP1, WP2, WP3, ..., WPn
10. Lead beneficiary
This must be one of the beneficiaries in the grant (not a third party) - Number of the beneficiary leading the work in this
work package
11. Person-months per work package
The total number of person-months allocated to each work package.
12. Start month
Relative start date for the work in the specific work packages, month 1 marking the start date of the project, and all other
start dates being relative to this start date.
13. End month
Relative end date, month 1 marking the start date of the project, and all end dates being relative to this start date.
14. Deliverable number
Deliverable numbers: D1 - Dn
15. Type
Please indicate the type of the deliverable using one of the following codes:
R Document, report
DEM Demonstrator, pilot, prototype
DEC Websites, patent fillings, videos, etc.
OTHER
ETHICS Ethics requirement
ORDP Open Research Data Pilot
DATA data sets, microdata, etc.
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
16. Dissemination level
Please indicate the dissemination level using one of the following codes:
PU Public
CO Confidential, only for members of the consortium (including the Commission Services)
EU-RES Classified Information: RESTREINT UE (Commission Decision 2005/444/EC)
EU-CON Classified Information: CONFIDENTIEL UE (Commission Decision 2005/444/EC)
EU-SEC Classified Information: SECRET UE (Commission Decision 2005/444/EC)
17. Delivery date for Deliverable
Month in which the deliverables will be available, month 1 marking the start date of the project, and all delivery dates
being relative to this start date.
18. Milestone number
Milestone number:MS1, MS2, ..., MSn
19. Review number
Review number: RV1, RV2, ..., RVn
20. Installation Number
Number progressively the installations of a same infrastructure. An installation is a part of an infrastructure that could be
used independently from the rest.
21. Installation country
Code of the country where the installation is located or IO if the access provider (the beneficiary or linked third party) is
an international organization, an ERIC or a similar legal entity.
22. Type of access
VA if virtual access,
TA-uc if trans-national access with access costs declared on the basis of unit cost,
TA-ac if trans-national access with access costs declared as actual costs, and
TA-cb if trans-national access with access costs declared as a combination of actual costs and costs on the basis of
unit cost.
23. Access costs
Cost of the access provided under the project. For virtual access fill only the second column. For trans-national access
fill one of the two columns or both according to the way access costs are declared. Trans-national access costs on the
basis of unit cost will result from the unit cost by the quantity of access to be provided.
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
EUROPEAN COMMISSION
CONSUMERS, HEALTH, AGRICULTURE AND FOOD EXECUTIVE AGENCY
Health and Food Safety Unit
Proposal template
Joint Action Grants (HP-JA)
3rd EU Health Programme
This template is aligned with the Open PM² Methodology of the European
Commission
Find out more about Open PM² here
Date: 09/07/2020 1 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
HISTORY OF CHANGES
Version Publication date Changes
1.0 30 October 2019 First draft for submission
1.1 5 November 2019 Final draft for submission – amended budgets of IE, PT, WP 6 description and
Collaborating Partners added
1.2 25 February 2020 Second draft for submission:
Correction of the List of applicants for Latvia (pg. 5)
Addition of additional text in Chapter 1. Problem analysis including evidence
base on nutrition characteristics and on nutrition status, based on HBSC
comparative data (pg. 6-10)
Addition of upgraded text in section 2.2. Specific Objective(s) of the Project
on the S (specific) and T (timely) components of the SMART criteria (pg. 10-
15)
Addition of additional text in Chapter 3. Stakeholder – target groups on
public health population and contribution of retail labelling (pg. 15-16)
Addition of additional text in section 4.2. Added Value on inequalities and
avoidance of duplication of other existing actions at EU level and on food
systems indicator (pg. 18)
Addition of additional text in section 4.4. Context of the project work on
different delivery systems for school food, procurement and obesity among
Europe countries (pg. 19-23)
Addition of additional text in Chapter 5. Methods and means on JRC Food
database and correction of a research method (pg. 23-24)
Table correction in section 7.1 Overview of Work Packages (WPs) on WP2
description (pg. 25)
WP1 includes additional text on JA Steering Committee (SC) and on expertize
on agri-food chain and addition of deliverable D1.3 (pg. 25-27)
WP2 includes rewritten work description of all activities, specifics,
deliverables and milestones (pg. 27-32)
WP3 includes correction of milestones M3.1 and M3.2 (pg. 35)
WP4 includes additional text on Food information database T4.5 – including
inequalities and sustainable system to keep expanding the dataset by the
MSs (pg. 37-38)
WP5 includes additional text on Overall objectives, Prioritization of the
processed food categories – including inequalities, Trend assessment of the
nutritional quality of the processed food and deliverable D5.2 (pg. 38-42)
WP6 includes additional text on Establishment of the EU oversight working
group and national intersectoral working group, Transposition of the new
Audio-visual Media Services Directive (AVMSD), Development of an EU-wide
harmonised and comprehensive monitoring protocol for unhealthy food
marketing to children and adolescents, Adaptation of the monitoring tools
to address health inequalities, deliverables D6.1-D6.5 and milestones M6.1-
M6.4. Also word harmonization was replaced with harmonisation (pg. 42-
47)
WP7 includes additional text on EU and national legislative frame and
intersectoral cooperation (pg. 47-50)
Revision of Timetable and Milestones in section 7.3, according to new
deliverables/milestones definitions (pg. 51-52)
Revision of Deliverables in Chapter 8 according to new deliverables
definitions (pg. 53-55)
Replaced pie charts with new values in section 10.1 (corrected % of person
month distribution per WP and % of costs per budget category (pg. 71-72)
Correction of Types of subcontracting in the Best-ReMaP JA table and
addition of detailed sub-contracting table in section 10.1 (pg. 72-77)
Re-calculation of person months per Associated Partners in light of their
inclusions in WP(s) 1-7 (section 10.2. Summary of Effort, pg. 78)
All partners - specified number of PM's per each staff member in category A
Direct personnel cost (section 10.4, pg. 79-136)
All partners - added number of participants for each event in category C.3
Other goods and services (section 10.4, pg. 79-136)
All partners - itemized costs for category C.1 Travel (section 10.4, pg.79-136)
All partners - itemized costs for category C.3 Other goods and services
(section 10.4, pg. 79-136)
Date: 09/07/2020 2 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Partner 1 NIJZ - adjusted PM for WP2, WP4 and WP7; adjusted Monthly
costs; reduced costs for WP7 subcontracting; added cost for WP6
subcontracting; reduced costs in category C.1 Travel; adjusted costs in
category C.3 Other goods and services (section 10.4, pg. 79-82)
Partner 2 BMASGK - adjusted costs in category C.1 Travel (section 10.4, pg.
82-85)
Partner 6 CIPH and 13 ICH - cent equalisation in the line Total estimated
eligible costs (section 10.4, pg. 104, 132)
Partner 11 ANSES and MoH-FR - costs for organization of Final conference
moved from competent authority (ANSES) to affiliated entity (MoH-FR), the
same costs moved from category C.3 Other costs to category B Direct cost
of subcontracting (section 10.4, pg. 105-108)
Partner 14 SU - 8.000,00€ moved from category C. Other costs to category B
Direct cost of subcontracting; costs for the organization of 2 events moved
from SU to NIPN, accordingly also redistributed PM from SU to NIPN; added
budget for Subcontracting (section 10.4, pg. 113-116)
Partner 17 CDPC - cost for WP6 - expert consultation about Nutrition Profile
and EU-wide harmonised and comprehensive monitoring protocol for food
marketing moved from category C.3 Other costs to category B Direct cost of
subcontracting (section 10.4, pg. 122-123)
Partner 21 SUM - cost for reimbursement for external participants for WP7
national meeting moved from category C.3 Other costs to category C.1
Travel (section 10.4, pg. 128-130)
Partner 22 DGS - cost for research and technical support moved from
category B Direct cost of subcontracting to category A Direct personnel costs
(section 10.4, pg. 130-131)
Partner 23 NIPH - removed cost for printing and for subcontracting (section
10.4, pg. 133-134)
Addition of three collaborating stakeholders in Chapter 14 (pg. 138-139)
1.3 11 June 2020 Third draft for submission:
Standardized name of the project (Best-ReMaP) throughout the whole
document
Correction of the List of applicants for Latvia and addition of affiliated entity
in Austria (pg. 6)
Addition of additional text in Chapter 1. Problem analysis including evidence
base on COVID-19 situation regarding it’s impacts on obesity and Farm to
fork strategy (pg. 11)
Addition of additional text in section 2.1 General Objectives of the project
(pg. 12)
Upgrade of the process, output and outcome indicators in section 2.2.
Specific Objective(s) of the Project (pg. 12-16)
Addition of additional text on addressing the orientations of the newly
adopted Farm to Fork Strategy in section 4.1 Contribution to the Annual
Work Plan (pg. 18-19)
Addition of additional text in section 4.2. Added Value on JRC food database,
role of WP2 and WP4 regarding stakeholders and on supporting the optimal
function of the immune system in protection against the Covid-19 disease
(pg. 19-20)
Addition of additional text in Chapter 5. Methods and means on JRC food
database (pg. 25-26)
Table correction in section 7.1 Overview of Work Packages (WPs) on WP5
and WP6 title (pg. 27)
WP1 includes additional text on WP1 management, EU added value and
deliverables (pg. 28-31)
WP2 includes additional text on dissemination strategy, EU added value and
correction of deliverables and milestones (pg. 31-36)
WP3 includes upgrade of deliverables and milestones and additional text on
EU added value and general objectives (pg. 37-39)
WP4 includes additional text on objectives, on HLG on nutrition and physical
activity (HLG-N&PA) sustainability actions, JRC food database, EU added
value and correction of deliverables and milestones (pg. 39-43)
WP5 includes additional text on sustainability plan at the HLG-N&PA level,
including already established EU Framework for Action for food
reformulation, JRC food database, EU added value and correction of
deliverables and milestones (pg. 44-47)
WP6 includes additional text on objectives, sustainability plan for HLG-N&PA
EU Framework for Action for reducing marketing foods for children, JRC food
Date: 09/07/2020 3 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
database, EU added value and correction of deliverables and milestones (pg.
48-53)
WP7 includes additional text on national/regional/local focal points,
sustainability plan for HLG-N&PA Framework for action for food
procurements, EU added value and correction of deliverables (pg. 54-58)
Revision of Timetable and Milestones in section 7.3, according to new
deliverables/milestones definitions (pg. 59-60)
Revision of Deliverables in Chapter 8 according to new deliverables
definitions (pg. 61-63)
Addition of additional text in section 9.3. Processes & Artefacts on avoidance
of duplication of documents, Project and Financial policy (pg. 65)
Correction of Capacity of the staff to carry out the project for Austria, Latvia
and Netherlands (pg. 66-74).
Upgrade of the Risk Analyses and Treatment (section 9.6), in line with the
new Covid-19 situation and upgrade of the WP6 content risks (pg. 75-79)
Replaced pie charts with new values in section 10.1 (corrected % of person
month distribution per WP and % of costs per budget category (pg. 80-81)
Correction of detailed sub-contracting table in section 10.1 (pg. 82-86)
Addition of the staff effort of affiliated entities in the table Summary of Effort
(section 10.2, pg. 87) and under all WPs (section 7.2, pg. 28, 31, 37, 39, 44,
48, 54)
Partner 1 NIJZ - adjusted costs in category C.3 Other goods and services
(section 10.4, pg. 88-91)
Addition of Detailed budget for new affiliated entity of BMASGK (GOeG) (pg.
94-95)
Partner 4.2 PHI-RS, 14 SU and 15.2 CHDR - cent equalisation in the lines (D)
Indirect costs and Total estimated eligible costs (section 10.4, pg. 100-101,
122-123, 129-130)
Addition of one affiliated entity in Chapter 11 on Previous and current grants
relevant to the programme (pg. 146)
Addition of one affiliated entity in Chapter 12 on Current applications
relevant to the programme (pg. 147)
1.4 9 July 2020 Fourth draft for submission:
Addition of the reference regarding the key characteristics of the school food
policy in EU MS (pg. 11), additional text on possible higher exposure to on-
line marketing during covid-19 (pg.12) and explanation of the CEAP
abbreviation regarding Farm to fork strategy (pg. 12)
Correction of the number of partners from European country eligible for the
EU Health programme in section 4.3 Pertinence of Geographic Coverage (pg.
22)
Clarification of the Policy briefs in WP1 (pg. 31) and WP4 (pg. 44)
WP1 includes upgrade of deliverables and milestones (pg. 32)
WP2 includes clarification regarding Newsletters production, addition of the
production month of the leaflet for families, upgrade of deliverables and
milestones (pg. 33-38)
WP4 includes additional clarification text on Framework on Action, series of
events, preparation of a Draft Integration and sustainability plan, additional
text on desk research, upgrade of deliverables and milestones (pg. 41-45)
WP5 includes upgrade of deliverables and milestones (pg. 49)
WP6 includes upgrade of deliverables and milestones (pg. 55)
WP7 includes upgrade of deliverables and milestones (pg. 60)
Revision of Timetable and Milestones in section 7.3, according to new
deliverables/milestones definitions (pg. 61-63)
Revision of Deliverables in Chapter 8 according to new deliverables
definitions (pg. 64-67)
Correction of Capacity of the staff to carry out the project for France (pg.
74).
Correction of detailed sub-contracting table in section 10.1 (pg. 87-91)
Addition of the justification of subcontracting costs for partners: 1 NIJZ (pg.
93, 94), 15.2 CHDR (pg. 133), 16 ISS (pg. 134), 17 CDPC (pg. 136) in section
10.4 Detailed budget
Adjusted costs in categories C.1 Travel and C.3 Other goods and services in
section 10.4 Detailed budget – partners: 1 NIJZ (pg. 94, 95), 3 SCIENSANO
(pg. 100, 101, 8.2 CPH-MUN (pg. 113), 10 THL (pg. 117-119), 11 ANSES (pg.
120), 14 SU (pg. 127, 128),15.2 CHDR (pg. 133, 134), 16 ISS (pg. 135, 136) –
added costs for audit
Date: 09/07/2020 4 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Replaced pie chart with new values in section 10.1 (corrected % of costs per
budget category (pg. 85, 86)
Correction of the country and city of one of the collaborating stakeholders
in chapter 14 (pg. 151)
Date: 09/07/2020 5 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
TABLE OF CONTENTS
COVER PAGE .............................................................................................................................7
Title of Proposal ....................................................................................................................... 7
List of Applicants ...................................................................................................................... 7
1 PROBLEM ANALYSIS INCLUDING EVIDENCE BASE ................................................................8
2 GOALS AND OBJECTIVES OF THE PROJECT ......................................................................... 13
2.1 General Objectives of the Project .................................................................................. 13
2.2 Specific Objective(s) of the Project ................................................................................ 13
3 STAKEHOLDER - TARGET GROUPS ..................................................................................... 18
4 POLITICAL RELEVANCE ...................................................................................................... 19
4.1 Contribution to the Annual Work Plan .......................................................................... 19
4.2 Added Value................................................................................................................... 20
4.3 Pertinence of Geographic Coverage .............................................................................. 22
4.4 Context of the project work ........................................................................................... 22
5 METHODS AND MEANS ..................................................................................................... 26
6 EXPECTED OUTCOMES AND BENEFITS OF THE PROJECT .................................................... 27
7 WORK PACKAGES .............................................................................................................. 28
7.1 Overview of Work Packages (WPs) ................................................................................ 28
7.2 Work Packages (WP) Description .................................................................................. 29
7.3 Timetable and Milestones ............................................................................................. 61
8 DELIVERABLES ................................................................................................................... 64
9 PROJECT MANAGEMENT ................................................................................................... 68
9.1 Methods......................................................................................................................... 68
9.2 Governance, Roles, Responsibilities .............................................................................. 69
9.3 Processes & Artefacts .................................................................................................... 69
9.4 Quality & Capacity of the Partnership ........................................................................... 70
9.5 Capacity of the staff to carry out the project ................................................................ 71
9.6 Risk Analysis and Treatment .......................................................................................... 80
9.7 Financial management................................................................................................... 84
10 BUDGET ............................................................................................................................ 85
10.1 Content description and justification ............................................................................ 85
10.2 Summary of Effort.......................................................................................................... 92
10.3 Third-Party Contributions .............................................................................................. 93
10.4 Detailed Budget ............................................................................................................. 93
11 PREVIOUS AND CURRENT GRANTS RELEVANT TO THE PROGRAMME ............................. 150
12 CURRENT APPLICATIONS RELEVANT TO THE PROGRAMME ............................................ 151
13 EXCEPTIONAL UTILITY ..................................................................................................... 151
14 COLLABORATING STAKEHOLDERS ................................................................................... 151
Date: 09/07/2020 6 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
COVER PAGE
Title of Proposal
Joint Action on implementation of validated best practices on nutrition (JA Best–ReMaP)
List of Applicants
APPLICANT NO* APPLICANT ORGANISATION NAME COUNTRY
1
The National Institute of Public Health Slovenia
(COORDINATOR)
The Federal Ministry
2 Republic of Labour, Social Affairs, Health and Consumer Austria
Protection
2.1 The Austrian Agency for Health and Food Safety Austria
2.2 The Austrian National Public Health Institute Austria
3 SCIENSANO Belgium
Bosnia and
4 The Ministry of Civil Affairs of Bosnia and Herzegovina
Herzegovina
Institute of Public Health of Federation of Bosnia and Bosnia and
4.1
Herzegovina Herzegovina
Bosnia and
4.2. Public Health Institute of Republic of Srpska
Herzegovina
5 The National Centre of Public Health and Analyses Bulgaria
6 Croatian Institute of Public Health Croatia
7 Ministry of Health Cyprus
8 The Danish Veterinary and Food Administration Denmark
8.1 Copenhagen Municipality Denmark
9 Ministry of Social Affairs of Estonia Estonia
9.1 The National Institute for Health Development Estonia
10 The Finish Institute for Health and Welfare Finland
French Agency for Food, Environmental and Occupational
11 France
Health Safety
11.1 Santé publique France France
11.2 Ministry of Health of France France
Max Rubner-Institut, Federal Research Institute of
12 Germany
Nutrition and Food
13 Institute of Child Health Greece
14 Semmelweis University Hungary
14.1 The National Institute of Pharmacy and Nutrition Hungary
15 Department of Health Ireland
15.1 The Food Safety Authority Ireland
15.2 The Centre for Health & Diet Research Ireland
16 Istituto Superiore di Sanita’ Italy
17 The Centre for Disease Prevention and Control Latvia
18 Ministry of Health of Lithuania Lithuania
Public Health Regulation Department,
19 Malta
Ministry for Health, Malta
The National Institute for Public Health and the
20 Netherlands
Environment
21 The Medical University of Silesia Poland
22 Directorate-General of Health Portugal
22.1 The Faculty of Nutrition and Food Sciences Portugal
23 The National Institute of Public Health Romania
Institute of Public Health of Serbia "dr Milan Jovanović
24 Serbia
Batut"
Date: 09/07/2020 7 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1 PROBLEM ANALYSIS INCLUDING EVIDENCE BASE
Childhood obesity is a global public health problem in Europe and worldwide. According to the
European Commission, in 2017 around 15% of children and adolescents were overweight in the
European Union and about 5% were obese1. In their Childhood Obesity Surveillance Initiative
(COSI 2015-2017), the WHO reported that the most obese and overweight children come from
southern Europe, while the least obese 6-9 year-olds are in northern Europe2. In high-income
countries, there is more obesity among children with lower socioeconomic status.
Obesity in childhood is the result of an interaction between the various complex factors
associated with genetics, family and the local community, as well as the educational and wider
social environment in which the child and his/her caregivers make decisions regarding nutrition.
Eating behaviour is a very complex societal practice, influenced by a number of facilitating and
inhibitory factors for healthy choices at the structural and individual level. The structure-agency
dilemma in eating practices was explored by a number of authors from different disciplines,
identifying important structural influence of the eating environment on the individual choices,
cumulating in Swinburne’s et all logical framework of obesogenic environment in 19993.
Every culture selectively defines what is edible and acceptable and what not4. Food choice is
value driven, based in the social values of the individual society5 and the cultural dimension of
eating behaviour was described by Massimo Montanari, starting with the descriptive and
interpretative analysis of the south – north differences in eating behaviours in Medieval Europe,
describing more vegetable oriented diets in South and more meat oriented diets in North
Europe6, and describing food as culture7. Socio psychological dimension of eating behaviour was
described by authors like Lupton8 in extenso.
One of the earlier descriptions of the background rationale for nutrition practices in different
EU regions was provided in 19999, arguing that socioeconomic factors, such as education and
income, are the most important drivers for food choices in 15 EU MS, at the same time
identifying lack of time for food preparation and changing taste of the foods at the market as
the most important inhibitory drivers for healthy food choices.
The most common cause of childhood obesity is a positive energy balance due to increased
caloric intake and reduced caloric expenditure10. There is increasing evidence of epigenetic
factors that can cause hereditary changes in adiposity. Influences in early childhood are broad
and complex and could lead to a difference in normal gut microbiome - possibly due to maternal
obesity and high consumption of high fat, sugar and salt foods (HFSS). This thereby affects
inflammation, nutrient absorption and different immune system development in the infant11,12.
All of these factors contribute to a vicious cycle and impact the obesity outcomes of the child.
Obesity in children affects the functioning of the entire body: it affects the endocrine,
gastrointestinal, respiratory, cardiovascular and musculoskeletal systems, impairs quality of life
in childhood and shortens healthy life years and life expectancy. The severity of associated
1 https://ec.europa.eu/jrc/en/publication/public-procurement-food-health-technical-report-school-setting
2 http://www.euro.who.int/__data/assets/pdf_file/0006/372426/WH14_COSI_factsheets_v2.pdf?ua=1
3 https://www.ncbi.nlm.nih.gov/pubmed/10600438
4 Breadsworth A and Keil T, Sociology on the Menu: An Invitation to the Study of Food and Society, Routledge 1997
5 Lang T and Haesman M, 2004. Food wars: The global battle for mouths, minds and markets. London: Sterling: VA
6 Montanari M, The culture of food, 1994, Wiley and sons
7 Montanari M, Food is culture (2006, Columbia University Press)
8 Lupton D. 1996. Food, the body and the self. London: Sage
9 Kearny JM, McElhone S. 1999. Perveived barriers in trying to eat healthier – results of pan-EU consumer attitudinal survey- BJ Nutr, 81; S2: S133-S137
10 Kumar S, Kelly AS. Review of Childhood Obesity: From Epidemiology, Etiology, and Comorbidities to Clinical Assessment and Treatment. Mayo Clin
Proc. 2017;92(2):251-65.
11 Brown CL, Halvorson EE, Cohen GM, Lazorick S, Skelton JA. Addressing Childhood Obesity: Opportunities for Prevention. Pediatr Clin North Am.
2015;62(5):1241-61.
12 Gurnani M, Birken C, Hamilton J. Childhood Obesity: Causes, Consequences, and Management. Pediatr Clin North Am. 2015;62(4):821-40.
Date: 09/07/2020 8 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
diseases is significantly increased in the case of morbid obesity13. Adolescents who were obese
in childhood are at increased risk of developing metabolic syndrome with all health
consequences and cancer. As childhood obesity predicts obesity in adulthood, the increasing
prevalence of childhood obesity means an increasing incidence of obesity in adulthood with
related diseases and complications14.
Psychosocial consequences of childhood obesity are also very common, and include low self-
esteem, anxiety, depression and a lower health-related quality of life. Children with obesity are
more likely to be victims of discrimination and peer harassment; they are more likely to have
difficulty concentrating and completing homework. Overweight also negatively impacts
educational outcomes, as children with a healthy weight are 13% more likely to report good
performance in schools. Therefore, childhood obesity is a strong predictor of adult obesity, with
serious health and economic consequences15.
According to the OECD16, overweight and its associated chronic diseases such as diabetes,
cardiovascular diseases and cancer reduce life expectancy in OECD countries by 2.7 years on
average. 8.4% of the health budget of OECD countries will be spent to treat the consequences
of overweight over the next thirty years. At that baseline, overweight reduces employment and
workers’ productivity. The impact can be quantified as equivalent to a reduction in the
workforce of 54 million people per year across the 52 countries analysed, also including the
EU28. The economic losses include the costs of medical care, the costs of lost or decreased
productivity, lost working days, mortality and permanent disability, but also the wider socio-
economic impact of obesity (e.g. increased social transfers and loss of income due to
absenteeism and sick leave). These effects combined, overweight reduces GDP by 3.3% on
average in both OECD countries and EU28 Member States.
There are three major policies which could influence children’s food choices: food reformulation
activities, actions to reduce harmful food marketing to children and quality based food public
procurements. Obesogenic environments stimulate the consumption of excess calories through
HFSS foods. Therefore, activities aimed at reformulating foods into healthier alternatives are the
first crucial step in improving the food supply for children. It is also of concern that in recent
years the ongoing formulation of toddler foods is bringing a new wave of HFSS foods, which will
cause the need for further reformulation of foods for this age group, as this is a crucial period
for the development of taste and subsequent nutritional preferences of children17, 18, 19.
Harmonised EU monitoring of the reformulation actions was addressed as one of the key
approaches in creating healthier options as easier healthy food options for children and their
caregivers- “what gets measured gets done”. Supported by the EU AP on childhood obesity20,
access to an improved and healthier food offer in (super)markets, local producers and markets,
restaurants and other retailers (and schools) must be made easier.
There is unequivocal evidence that childhood obesity is influenced by marketing of foods and
non-alcoholic beverages high in saturated fat, salt and/or free sugars (HFSS)21. Furthermore,
there is convincing evidence that HFSS marketing in traditional media has detrimental effects on
children’s eating and eating-related behaviour, and early studies suggest that HFSS marketing in
13 Kumar S, Kelly AS. Review of Childhood Obesity: From Epidemiology, Etiology, and Comorbidities to Clinical Assessment and Treatment. Mayo Clin
Proc. 2017;92(2):251-65.
14 Kelsey MM, Zaepfel A, Bjornstad P, Nadeau KJ. Age-related consequences of childhood obesity. Gerontology. 2014;60(3):222-8.
15 https://www.unicef.org/media/60806/file/SOWC-2019.pdf
16 https://www.oecd.org/health/health-systems/Heavy-burden-of-obesity-Policy-Brief-2019.pdf
17 https://ec.europa.eu/jrc/sites/jrcsh/files/processed_cereal_baby_food_online.pdf
18http://www.euro.who.int/__data/assets/pdf_file/0003/406452/CLEAN_Commercial-foods_03July_disclaimer_LV.pdf?ua=1
19 http://www.euro.who.int/__data/assets/pdf_file/0004/406453/Ending_Final_3June2019.pdf?ua=1
20https://ec.europa.eu/health/sites/health/files/nutrition_physical_activity/docs/childhoodobesity_actionplan_2014_2020_en.pdf
21http://www.efad.org/media/1664/tackling-food-marketing-children-digital-world-trans-disciplinary-perspectives-en.pdf
Date: 09/07/2020 9 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
digital media has similar effects. The aim of digital HFSS marketing is to engage children in
emotional, entertaining experiences and to encourage them to share these experiences with
their friends. The major platforms give preference to less overt, longer-viewed advertisements,
thus bypassing any media literacy children might have and amplifying the power of practices in
traditional media. According to the WHO Commission on ending childhood obesity, efforts must
be made to ensure that children everywhere are protected against the impact of marketing and
given the opportunity to grow and develop in an enabling food environment — one that fosters
and encourages healthy dietary choices and promotes the maintenance of healthy weight22.
As children spend almost a third of their day in kindergarten or school and consume a large part
of their daily energy intake in educational environments, the types of environments present are
important factors in the development of childhood obesity. Strong evidence of the importance
of access to healthy and balanced nutrition in schools for children's health is available, and a
nutritionally regulated school environment is associated with a lower risk of childhood obesity,
which can also be facilitated by a transparent and quality-oriented procurement system. At an
estimated €82 billion, the European social food service market is sizeable in both reach and
force. Progressive and targeted public procurement of food for health can reward food business
operators who provide nutritionally balanced meals and food products, prompting innovation,
food reformulation and social responsibility to achieve better diets and positively impact public
health23. According to the EU AP on childhood obesity, action such as use of nutritional criteria
in food service procurement should be required in schools and kindergartens24; such action can
also be used in hospitals and residential homes.
The school setting is one of the most important of the supportive environments for healthy
nutrition for children and adolescent. EU MS have explored the possible actions in schools
settings extensively since the adoption of the EU AP on Childhood Obesity in 201425. »School
food and nutrition in Europe: policies, interventions and their impact« workshop26 was held in
2014, during the adoption process of the Council conclusions of the Greek presidency27,
comprehensively discussing SFP in EU and identifying key leverages for improvement. Public
procurements of foods were jointly identified for the first time as the key issue in a number of
MS, taken over by the HLG in 2015 and by Maltese presidency in 2017, including extensive
preparatory process led by Malta in 2016. Council conclusions of the Maltese presidency have
put public procurements of foods in school and other public settings high on the policy agenda,
followed by the search for good practices in that area among MS in the frame of the HLG on
nutrition and since 2017 in SGPP (Steering group on prevention and promotion). By the end of
2018, three major good practices for joint implementation in the area of nutrition were selected,
public procurements of foods in public settings for children among them. In 2019, EC launched
the JA Best practices in nutrition call.
Regarding school feeding programmes, all 27 EU Member States as well as UK, Norway and
Switzerland have acknowledged the important contribution of school food to child health and
development by providing either voluntary guidelines or mandatory regulations of what foods
and drinks may/should be served in the school setting28. The descriptive survey of European
school food policies was conducted in 2014 and the JRC, DG Santé and MS have worked together
to meet the needs of European policy makers and public health researchers alike, to help policy
22 https://apps.who.int/iris/bitstream/handle/10665/44416/9789241500210_eng.pdf?sequence=1
23 https://ec.europa.eu/jrc/en/publication/public-procurement-food-health-technical-report-school-setting
24https://ec.europa.eu/health/sites/health/files/nutrition_physical_activity/docs/childhoodobesity_actionplan_2014_2020_en.pdf
25https://ec.europa.eu/health/sites/health/files/nutrition_physical_activity/docs/childhoodobesity_actionplan_2014_2020_en.pdf
26http://www.aecosan.msssi.gob.es/AECOSAN/docs/documentos/nutricion/observatorio/school_food_policy_workshop_report.pdf
27 https://www.consilium.europa.eu/media/28049/143285.pdf
28 https://publications.jrc.ec.europa.eu/repository/bitstream/JRC90452/lbna26651enn.pdf
Date: 09/07/2020 10 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
makers facilitate exchange of experiences and support researchers in assessing impact on public
health.
The key characteristics of the SFP in EU MS are: (1) all 30 countries29 have a SFP in place; 34 SFP
documents (Belgium has separate policies for Flanders and Wallonia and the UK has separate
policies for England, Northern Ireland, Scotland and Wales); (2) there is an almost even split
between voluntary guidelines and obligatory standards across the 34 SFP considered; (3) despite
differences in history and extent of providing food at school, the primary SFP aims are common
to most MS: to improve child nutrition (97% of all policies), to teach healthy diet and lifestyle
habits (94%), and to reduce or prevent childhood obesity (88%); (3) not all SFP consider
evaluation: 59% define outcome measures, the top five being food provision in school (56%),
take up of school meals (35%), nutrition of children (29%), food consumption at school (24%),
and financial viability of services (15%); (4) most SFP (>90%) employ food-based standards to
ensure balanced menus; this is followed by portion size guidance (76%) and nutrient-based
standards for lunch (68%) and other mealtimes (56%) (5) lunch and snacks appear as the most
common focus at almost 90% of SFP (6) 65-82% of SFP set restrictions on beverages available or
recommended to school children, the majority supporting (free) access to fresh drinking water
and specifically limiting or banning (sugar-sweetened) soft drinks (6) sweet treats and savoury
snacks are restricted in 59-79% of SFP, ranging from being allowed occasionally to complete
bans; (7) energy and fat intakes are the most commonly referred to items in energy/nutrient-
based standards for lunch at 65% and 59%, respectively; (8) vending machine offers are
restricted in 53% of SFP; measures reach from (more) healthful options being recommended/
promoted, to offers being in line with healthy eating guidance/standards, to (certain)
unhealthful foods/drinks not allowed in vending machines, to vending machines not existing on
or being banned from school premises; (9) 65% of SFP stipulate training requirements of school
catering staff; (10) food marketing limitations apply in 76% of SFP, with four SFP restricting the
marketing of foods and drinks high in sugar, fat or salt; 17 SFP specifying generic marketing
restrictions; and five SFP setting restrictions for both.
Therefore, early childhood obesity prevention should be a public health priority. Measures to
prevent childhood obesity, which affect society, politics and the environment, have the greatest
potential to produce the desired effect. Policy interventions can address economic, social and
communication factors and can be targeted at the level of society (state law, industry-level
improvements, social marketing), populations (regional rules) or the local community and
families in the community approach. Stakeholders are to be participatory engaged in the
processes, from all spheres of the society: formal and non-formal, public and private, profit and
non-profit. The power of individual stakeholders has to be considered, as in the case of private
actors, where globalisation is substantially shaping food options and choices: 77% of processed
food sales worldwide are controlled by just 100 large companies30.
Healthy nutrition for children has been prioritised by a number of guiding documents in the past
decade and in recent years. One of the most important documents in this field is the EU Action
Plan on childhood obesity 2014 - 202031, where reformulation, marketing foods to children and
public procurements actions are covered by areas 2 (Promote healthier environments, especially
in schools and pre-schools), 3 (make the healthy option the easier option) and 4 (Restrict
marketing and advertising to children). Another key document is the WHO Commission on
ending childhood obesity report32, which defines promotion of the intake of healthy foods, early
29
https://publications.jrc.ec.europa.eu/repository/bitstream/JRC90452/lbna26651enn.pdf
30 https://www.unicef.org/media/60806/file/SOWC-2019.pdf
31https://ec.europa.eu/health/sites/health/files/nutrition_physical_activity/docs/childhoodobesity_actionplan_2014_2020_en.pdf
32https://apps.who.int/iris/bitstream/handle/10665/259349/WHO-NMH-PND-ECHO-17.1-
eng.pdf;jsessionid=5B569DC6F8BA3A4C99980433DBCC9799?sequence=1
Date: 09/07/2020 11 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
childhood diet and health and nutrition of the school-aged children as the upmost priority,
among six key areas of action.
As to the outcomes of such measures - according to the OECD33, public health actions to promote
healthier lifestyles have a positive impact on population health and are an excellent investment
for countries. Up to 76,000 cases of chronic diseases per year can be avoided across 36 OECD
countries by implementing different public health interventions to provide information, increase
the availability of healthy options and to regulate or restrict unhealthy choices. Furthermore,
for every $1 invested in tackling overweight, up to $5.6 will be returned in economic benefits.
All in all, health budgets for all the 36 countries included in the study could save up to $26 billion
(adjusted for differences in purchasing power across countries) by 2050, by implementing
promotion and prevention actions.
The present situation in mid-2020 regarding the COVID-19 pandemic poses a huge risk for a
global economic crisis, which is expected to disproportionately affect the most vulnerable
populations. Those populations already bear a greater risk of obesity- coupled together, we can
expect to see an increase in the already existing obesity pandemic in the future. In some
countries, because of the measures to stop the spread of COVID-19, there are/will be impacts
on mobility and also possible higher exposure to on-line marketing. Enforced psychical inactivity
even for shorter periods of time increases the risk of metabolic diseases. The need for self-
isolation leads to relying on processed food with a longer shelf life (instead of fresh food
products) and canned food, which increases the possibility of increased weight if this persists
over a longer period of time34.
In general, for optimal support of the immune system, the diet of a child and adolescent should
be balanced, varied and adapted to the individual's nutritional status, nutritional needs, based
mainly on the level of physical activity, and health status. For that reason, the circumstances
surrounding the COVID 19 pandemic merit that all unbalanced diets should be avoided, as this
might downgrade the optimal functioning of the immune system 35
The Farm to Fork Strategy36 explains that current food consumption patterns are unsustainable
from both health and environmental points of view. While in the EU, average intakes of energy,
red meat, salt, sugars and fats continue to exceed recommendations, consumption of whole-
grain cereals, fruit and vegetables, legumes and nuts is insufficient. The Farm to Fork Strategy29
is a new comprehensive approach to how Europeans value food sustainability. It is an
opportunity to improve lifestyles, health, and the environment. The creation of a favourable
food environment that makes it easier to choose healthy and sustainable diets will benefit
consumers' health and quality of life, and reduce health-related costs for society. Furthermore,
European Commission will seek commitments from food companies and organisations to take
concrete actions on health and sustainability, focussing in particular on: reformulating food
products in line with guidelines for healthy, sustainable diets; reducing their environmental
footprint and energy consumption by becoming more energy efficient; adapting marketing and
advertising strategies taking into account the needs of the most vulnerable; ensuring that food
price campaigns do not undermine citizens' perception of the value of food; and reducing
packaging in line with the new CEAP (Circular Economy Action Plan)37. JA Best-ReMaP is
supporting the implementation of the key guidelines within the Farm to Fork strategy.
33 https://www.oecd.org/health/health-systems/Heavy-burden-of-obesity-Policy-Brief-2019.pdf
34 https://www.worldobesity.org/news/statement-coronavirus-covid-19-obesity
35https://www.nijz.si/sites/www.nijz.si/files/uploaded/priporocila_za_starejse_v_casu_epidemije_nove_virusne_bolezni_covid19.pdf
36 https://ec.europa.eu/food/sites/food/files/safety/docs/f2f_action-plan_2020_strategy-info_en.pdf
37
Communication from the Commission to the European Parliament, the Council, the European Economic and Social Committee and the Committee
of the Regions – A new Circular Economy Action Plan For a cleaner and more competitive Europe, COM/2020/98 final.
Date: 09/07/2020 12 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
2 GOALS AND OBJECTIVES OF THE PROJECT
2.1 General Objectives of the Project
The main focus of the Best-ReMaP Joint Action (JA Best-ReMaP or JA) will be on adapting,
replicating and implementing effective health interventions, based on practices that have been
proven to work in the areas of food reformulation, reducing food marketing to children and
public procurement of healthy food in public settings, thus contributing to increased offer of
healthier options of processed foods (by reducing salt, sugar and fat from the processed foods)
available in EU (super)markets. The JA will implement a European Standardised Monitoring
system for the reformulation of processed foods. The JA aims to deliver a harmonised EU
approach to reducing unhealthy (digital) food marketing to children and adolescents and to use
already developed tools for harmonised monitoring of (digital) marketing. A Pilot Catalogue of
food will be tested in the public procurement procedure to contribute to the higher quality of
menus by assuring transparent quality of the procured foods within public institutions. Building
on this work, the JA will support implementation, transfer and integration of the results,
outcomes and recommendations of the Best-ReMaP JA into national and EU-level policies, by
using the EC mechanism of High level group on nutrition and physical activity (HLG-N&PA) and
its frameworks, one already existing Framework on food reformulation and two new established
frameworks, Framework on reducing marketing to children and Framework on food
procurements in public settings. Throughout the JA processes, the participatory engagement of
EU and national stakeholders in the field will be prioritised.
2.2 Specific Objective(s) of the Project
Specific
Specific Objective Title and Description
Objective ID
To support implementation, transfer and integration of the results and
1
outcomes of the Best-ReMaP JA into national and EU-level policies
Process Indicator(s) Target value
Desk research of previous and ongoing
At least 10 strategic documents analysed in the
European initiatives and key strategic
desk research, carried out on the official websites
documents in the area of JA Best-
of the EU institutions and the MSs, from M1 and
ReMaP conducted, focused on
completed by M 12
sustainability issues and previous work
Semi-structured interviews on the
topic of food reformulation, food 9 semi-structured interviews carried out from M 6
marketing and public procurement of to M 12
foods with experts in relevant fields.
Policy dialogues with key stakeholders 1 x Mediterranean dialogue
and policymakers 1x Central European dialogue
1x Scandinavian/Northern dialogue
1 x EU policy dialogue,
from M 20 to M34
Output Indicator(s) Target value
Policy decision makers stakeholder Comprehensive list of Policy decision makers
mapping finalised stakeholders’ organizations and position prepared
from M 1 to M 12
Policy dialogue briefs arising from
policymaker dialogues with MS,
4 policy briefs, arising from policy makers dialogs,
outlining key issues discussed on the
from M 26 to M 36
topic of food reformulation, food
marketing and public procurement of
Date: 09/07/2020 13 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
foods, along with key findings and
recommendations.
Long-standing, sustainable Joint The JRC food database, with inputs for at least 5
Research Centre38 (JRC) food database food groups in the database, from M 6 to M 36
to be upgraded and implemented by
Member States
Report on integration and Report to be circulated to targeted decision making
sustainability in EU and national stakeholders in relevant sectors at EU and national
policies – outlining key levels, in 27 +2 MSs, from M 32 to M 36
recommendations for Steering Group
on prevention and promotion, High
Level Group on Nutrition & Psychical
Activity and MSs, for uptake of JA
findings
Outcome/Impact Indicator(s) Target value
Annual reporting meetings with High
Level Group on Nutrition & Psychical
Activity with updating presentations Two annual reporting meetings with High Level
and final reporting meeting with High Group, by M12 and M24
Level Group on Nutrition & Psychical One final reporting meeting with High Level Group,
Activity, followed by a structured with overview of the implementation plans in MSs
response of the MSs on how they plan for the next 5 year period, by M36
to approach the implementation of
the proposed JA Best-ReMaP actions
Development and proposal of the Food system indicators in the EU semester,
Food system indicator, for inclusion to developed and proposed, by M 36
the EU semester, possibly linked to the
presidency to EU.
Specific
Objective Specific Objective Title and Description
ID
To implement a European Standardised Monitoring system for the
2 reformulation of processed food
Process Indicator(s) Target value
Identification of the priority processed Analyse of the food groups contributors to the
food groups for a European monitoring nutrient intakes, for all the WP5 participants from
of the food supply the EFSA comprehensive database.
Definition of at least 5 priority processed food
groups, by M9
Training courses (workshops) on 6 training courses organised for MS, by M25
European Standardised Monitoring
system for the reformulation of
processed food organised for Member
States
38
https://ec.europa.eu/info/departments/joint-research-centre_en
Date: 09/07/2020 14 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Implementation of the European snapshot implementations covering 5 food groups
snapshot of the nutritional quality of in 19 countries, by M36
processed food
Workshops on key issues on European 1x first snapshot workshop with countries
Standardised Monitoring system for 1x EU stakeholder workshop with countries, by M36
the reformulation of processed food to
provide key stakeholder coordination
Output Indicator(s) Target value
- European Guidelines on reformulation European Guidelines on reformulation monitoring
monitoring, based on processed food to define:
supply - The monitoring methodology
- The priority processed food groups to be
included
- The best sources of data or best technologies
to use for the data collection
- The conditions for a sustainable European
monitoring,
by M30
- Number of first and second Snapshots At least 5 food groups covered in 20 countries,
on nutritional quality of the processed according to the same European standardised
food realised and number of food monitoring methodology, from M 10 to M 34
groups covered: data collected,
encoded and analysed, according to
the JANPA methodology
- First European analysis of the trend 1 Report on reformulation monitoring
assessment of the nutritional quality implementation and on the trend assessment of the
of the processed food and their nutritional quality and their impact on nutrient
impacts on nutrients intakes of intakes (fats, saturated fats, sugars, salt, only for
consumers. countries with old and new food composition data),
to promote best practices on reformulation at the
European level, by M36
Outcome/Impact Indicator(s) Target value
Implementation of a European European standardised Monitoring system for
Standardised Monitoring system for processed food monitoring implemented in 20 MS
the reformulation of processed food, and at European level, by M36
according to the Oqali/JANPA
methodology.
Promotion of the food reformulation Presentation of the impacts of food reformation
policy at the European level, by policy on nutrient intakes of consumers, based on
presenting the impact of JRC food database, especially for children, to the
reformulations on nutrient intakes High Level Group on Nutrition & Psychical Activity,
by M36 and dissemination of the results to a wide
range of stakeholders, by M36
Date: 09/07/2020 15 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Specific
Specific Objective Title and Description
Objective ID
To deliver a harmonised EU approach to reduce marketing of unhealthy food
3 products to children and adolescents and to use piloted tools for harmonised
monitoring of marketing
Process Indicator(s) Target value
Establishment of the subgroup of the 3 meetings of subgroup of High Level Group on
High Level Group on Nutrition & Nutrition & Psychical Activity held, from M6 to
Psychical Activity, supported by EU M34, with at least 5 interested MSs included in High
external expert group on (digital) Level Group on Nutrition & Psychical Activity
marketing. subgroup
National intersectoral working groups 2 meetings of national working groups held in
on (digital) marketing established participating MSs, per MS, from M9 to M32
Testing/piloting of the Nutrient Profile At least 3 Member States pilot Nutrient Profile
Model, based on WHO Nutrient Profile Model, based on WHO Nutrient Profile Model, from
Model, in implementation of the M1 to M28
revised Audio-visual Media Services
Directive (AVMSD)
Workshop on guiding principles for At least 10 participating MSs will be attending the
participating MSs on the workshop, by M 34
implementation process of the AVMSD
Output Indicator(s) Target value
Report on the mapping exercises 1 Mapping of MSs existing regulations in regards to
performed on food marketing to UN Convention on the Rights of the Child, from M3
children to M 13
Guidance for the adaptation of the 1 guidance document by M12
WHO Nutrient Profile Model to the
national contexts
EU pilot protocol to monitor food 1 EU pilot protocol, based on existing tools and MSs
marketing to children, based on inputs, from M6 to M34
existing tools and MSs inputs
Guidelines for codes of practices to 3 MSs cases of regulatory codes included and used
control food marketing to children as input for guidelines, from M13 to M31
Outcome/Impact Indicator(s) Target value
Harmonised MS approach in At least 3 MS involved in the harmonisation
transposition of AVMSD, with focus to process, from M4 to M32
nutrition public health guidelines for
children and nutrient profile as defined
in AVMSD within the national contexts
Harmonised EU monitoring protocol for EU monitoring protocol for food marketing to
food marketing to children and children and adolescents adapted in at least 5
adolescents with recommendations Member States, by M36
developed and available for MSs
EU harmonised Framework for Action Framework for action established by High Level
on reducing food marketing to children Group on Nutrition & Psychical Activity, by M18
Date: 09/07/2020 16 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Specific
Specific Objective Title and Description
Objective ID
To build knowledge in public procurement of food through development
4 and testing of the pilot Catalogue of food in the joint public procurement
procedure
Process Indicator(s) Target value
National workshop on public food
procurements to define the state of art
(situation analyses) in public food 1 national workshop per participating MS by M18
procurements and plan future steps/
define the process at the MSs level.
Knowledge building training Two knowledge building training workshops
workshops implemented organised for participating MSs, from M18 to M24
Policy level roundtable on sustainable
public food procurement policy 1 report with policy recommendations by M35
development
Output Indicator(s) Target value
Applicative situation analyses with
initial recommendations for food public 1 situation analysis, for at least 5 MS, from M1 to
procurement procedures, for M6
participating MSs
Training materials prepared, based on 1 package of training material for participating MSs,
the good practices, with the defined by M24
training protocol end evaluation
templates
Questionnaire for participating MSs 1 questionnaire on national/ regional/local public
prepared, to explore identified (food) procurement focal points for participating
national/ regional/local public (food) MSs, from M24-M30
procurement focal points
Joint template implementation of one At least 5 MSs involved in the implementation of
public tender, for one food group, in one public tender, from M25 to M30
piloting MS
Template/questionnaire to describe 1 template to be applied to each MS by M30
the process and experiences from the
individual MSs in implementing public
food procurement actions
Outcome/Impact Indicator(s) Target value
National/regional focal point (or 1 network of national focal points for public food
national specific alternative) for the procurements per MS (at least 5 in total,
public food procurements in public participating in the implemented public tender
settings identified from M7 to M18)
EU harmonized framework for Action Framework for Action, established by High Level
on public procurements of foods. Group on Nutrition & Psychical Activity, by M18
Date: 09/07/2020 17 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
3 STAKEHOLDER - TARGET GROUPS
A broad consortium of national and EU level stakeholders will be cooperating with the Best-
ReMaP JA. Moving on from just the “usual suspects”, we will employ different methodologies
for identification of a broad range of relevant stakeholders and stakeholder groups. We will build
on the previous efforts of the JANPA JA39, on the research stakeholders knowledge transfer from
the H2020 STOP project40,41 and possibly on H2020 CO-CREATE project stakeholders network.
Qualitative and quantitative stakeholder analyses will be conducted across the project partners
and where relevant, other stakeholders. The results of the analysis will be reflected in the
Dissemination Strategy. In collaboration, WPs 2, 4 and 5 - 7 will be identifying, updating and
grouping stakeholders, composing a comprehensive list of stakeholder’s organizations. In
addition, the analysis will explore new target groups, specific to the Best-ReMaP JA. Specific
target groups will be defined during the stakeholder mapping process coordinated by WP2 in
cooperation with the coordinator and the leaders of other work packages, especially WP4, as
defined in the Dissemination Strategy.
We anticipate the following target audiences and multipliers:
(1) the primary target group are the policy decision makers from national (and regional)
governments, since they take final decisions about the outcomes to be transferred and
implemented into policies and decide on how to embed the new or revised policies in the
normative/legislative framework;
(2) the secondary target group is twofold: (a) stakeholders: the food producers and retail sector
(as the societal mechanism, organising the offer of foods to consumers in the form of shops and
supermarkets)- although private-sector stakeholders will not have any role in the decision-
making process of this JA, they need to be informed, giving them a venue in which to discuss the
proposed measures in food reformulation, public procurement and advertising of the food
products for children; (b) right holders: (grand)parents and youth organisations, especially
interested in improving the obesogenic environments to include more information and choices
for healthy nutrition.
(3) the tertiary target group includes a) civil society in general, academia and professional
organisations and other organisations and bodies interested in the JA outputs and results, as
well as the b) general public or individual lay persons, for example (grand) parents who are
aware of the impact of food marketed to their children, or children and adolescents, being
targeted by marketing or receiving meals at organisations where food is purchased via public
procurements.
Children and adolescents will be the indirect end users of the policy measure outcomes,
produced by JA Best-ReMaP. JA Best-ReMaP is using the definition of the child as defined by
UNICEF, which stipulates that children are all individuals aged 0-19. As children and to major
extent adolescents do not usually operate as independent consumers, (grand)parents or other
caregivers in the general population are thus also a part of the target audience of the JA.
The Dissemination Strategy will define the dissemination aims and objectives. Joint Action
messages will be delivered to a wide range of audiences, stakeholders and right holders, as
foreseen via the Best-ReMaP website, newsletters, forum events, press releases, webinars,
general communication materials (leaflet, PPT, layman version of the final report) and with
special attention via social media and promotional video material. Media representatives will be
39 http://www.janpa.eu/about/project.asp
40 http://www.stopchildobesity.eu/what-is-stop/
41 http://www.stopchildobesity.eu/the-stop-shareholders-conference-16-september-2019/
Date: 09/07/2020 18 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
identified and engaged with separately, with special focus to their unique professional interests.
JA partners will be encouraged to disseminate to all three above-described target groups.
The personal contact information of stakeholders will be collected and stored only with the
explicit consent of stakeholders with a full consideration of the relevant GDPR stipulations. In
practice, this information will be collected only for communication on the JA, namely to send
out newsletters and notifications on events, deliverables and milestones.
4 POLITICAL RELEVANCE
4.1 Contribution to the Annual Work Plan
The Best-ReMaP JA proposes actions to address objective 3.1 of the 2019 Annual work
programme, that is increasing the offer of healthier options of processed food and/or reducing
salt, sugar and saturated fat from the processed food available in EU (super)markets42. Best-
ReMaP is also directly addressing the orientations of the newly adopted Farm to Fork strategy,
which is focussing in particular on reformulation of food products in line with guidelines for
healthy and sustainable diets; and adapting marketing and advertising strategies taking into
account the needs of the most vulnerable. Indirectly is addressing public procurements of foods,
while encouraging ensuring that food price campaigns do not undermine citizens' perception of
the value of food.
Through the period of 3 years, JA Best-ReMaP will implement three best practices, selected in a
transparent process by the SGPP (Steering Group on Promotion and Prevention) and HLG on
nutrition and physical activity. The process was supported by the JRC, through organising the
Marketplace workshop on nutrition and physical activity best practices43.
Following the Member States’ decision at the SGPP, the three best practices selected for
implementation in the area of prevention are as following:
(1) on establishing standardised reformulation and processed food monitoring system based on
the successful French/Joint Action on Nutrition and Physical Activity model (supporting the EU
Framework for national reformulation initiatives) 44, (2) on the framing of marketing aimed at
children of foods and beverages high in fats, sugars or salt 45,46; and (3) on public procurements
of food for health in public institutions (primarily kindergartens and schools)47.
Work on the monitoring system for reformulation initiatives will be based not only on the JANPA
WP5 results but also on the EUREMO (EU wide implementation of the reformulation monitoring)
snapshot in 16 EU MS, the majority of them participating in Best-ReMaP. Similarly, work on the
framing of marketing aimed at children of foods and beverages high in fats, sugars or salt will
not be based only on the MS good practices but will incorporate also the results of the Study on
the exposure of children to linear, non-linear and online marketing of foods high in fat, salt or
sugar. Both projects are funded by the EU Health Programme (Annual Work Programme 2018),
based on the recommendations of the MS, in the scope of the HLG on Nutrition and Physical
activity and SGPP.
The JA will focus on equity in general and in addition specifically in WP 6 and aims to build on
the Health Equity Pilot Project (HEPP) Scientific report on evidence based interventions to
reduce socio-economic inequalities in diet and physical activity48 and outcomes49.
Policy development in the areas of reformulation and marketing and in stakeholders
identification and engagement will seek to identify and exploit synergies and knowledge transfer
42https://ec.europa.eu/chafea/health/bookshelf/legal-documents/documents/awp-2019-annexes_en.pdf
43 https://ec.europa.eu/health/non_communicable_diseases/events/ev_20180315_en
44https://ec.europa.eu/health/sites/health/files/major_chronic_diseases/docs/ev_20180315_co01_en.pdf
45https://ec.europa.eu/health/sites/health/files/major_chronic_diseases/docs/ev_20180315_co11a_en.pdf
46https://ec.europa.eu/health/sites/health/files/major_chronic_diseases/docs/ev_20180315_co11b_en.pdf
47https://ec.europa.eu/health/sites/health/files/major_chronic_diseases/docs/ev_20180315_co12_en.pdf
48 https://ec.europa.eu/health/sites/health/files/social_determinants/docs/hepp_screport_intro_en.pdf
49 https://ec.europa.eu/health/social_determinants/projects/ep_funded_projects_en#fragment1
Date: 09/07/2020 19 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
with the H2020 STOP project50 (respective WP4, WP9 and WP10 of STOP). Stakeholder networks
and policy indicator work is also linked with the STOP-INFORMAS initiative51, which is translated
in the EU context via the JPI-HDHL PEN project52. NIJZ, who will act as the Best-ReMaP
coordinator, is also the STOP WP10 leader and involved in the STOP-PEN work, together with
three other MS (Finland, Latvia, Portugal) also participating in Best-ReMaP.
4.2 Added Value
Childhood overweight and its associated chronic diseases have a negative impact on societies
and the economy in EU Member States. One of the annual work programme 2019 priority areas,
implementing the Third Programme of the Union’s action in the field of health (2014-2020)
established under Regulation (EU) No 282/2014, is the Promotion of health and prevention of
non-communicable diseases. The Joint Action on implementation of validated best practices in
nutrition (Reformulation, Marketing and public Procurements – Best-ReMaP JA) addresses this
priority, as set by the Steering group on prevention and promotion, with support of the HLG on
nutrition.
As public health actions to promote healthier lifestyles have proven positive impacts on children
and population health and are an excellent investment for countries, the added value of the
Best-ReMaP JA is demonstrated in the following points:
1. Best-ReMaP will implement the actions recognised and framed by the MS in the EU
Action Plan on Childhood Obesity 2014 - 202053, based on the Greek Council
conclusions on nutrition and health; it represents the follow up to the JANPA JA, which
was implemented based on the same EU AP and thus assures the sustainable
implementation of the joint efforts of the EU MS in improving the obesity status of
children and adolescents in the EU, based on the transparently selected best practices;
2. In the area of reformulation, the work already started in the HLG (reformulation
framework and annexes), being supported by the Dutch presidency reformulation
roadmap, followed by innovative JANPA approach (based on 3 testing countries) and
further on by EUREMO (16 MS engaged in the snapshot) projects on the reformulation
monitoring; the process will be extended to new countries (altogether 21 EU MS will be
implementing standardised EU monitoring protocol which will be one of the major
sustainable impacts of the Joint Action);
3. for the first time at the European level, a list of priority food groups for the
reformulation monitoring will be defined jointly by all the engaged MS; a second
snapshot of the nutritional quality of the processed food will be implemented to assess
the trend and impacts of reformulation on nutrient intakes of the first time at the EU
level;
4. In the area of food marketing, a harmonised transposition process of the AVMSD is
foreseen for the interested MS, linked to ERGA and based on the WHO nutrition profile;
MS will jointly develop the food marketing evaluation protocols, based on the Nordic
monitoring protocol54 and on other developed (digital) marketing monitoring tools, or
alternately decide to develop rationale and guidance for the voluntary/co-regulatory
codes of practices;
5. Public procurement of foods in public institutions was identified as the priority area by
MS at the HLG meeting in Ispra in 2015, and was taken on board by the Maltese
presidency55; Slovene and other good practices (as for instance Strength2Food project)
50 http://www.stopchildobesity.eu/
51 https://www.informas.org/
52 https://www.jpi-pen.eu/summary.html
53https://ec.europa.eu/health/sites/health/files/nutrition_physical_activity/docs/childhoodobesity_actionplan_2014_2020_en.pdf
54 http://norden.diva-portal.org/smash/get/diva2:1183357/FULLTEXT02.pdf
55https://ec.europa.eu/jrc/en/publication/public-procurement-food-health-technical-report-school-setting
Date: 09/07/2020 20 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
will be upgraded and tested in the interested MS to support a more harmonised
implementation of the Procurement legislation; recommendations will be prepared to
support the improvement of the quality of the procured foods in public institutions,
preferably schools and kindergartens; identification of the national focal points or
alternatives will provide for the sustainability of the action;
6. Composition of the sustainable food information database with working title JRC food
database) is foreseen, based at JRC in Ispra, to capture the inputs from all three Best-
ReMaP core work packages;
7. Stakeholder work within Best-ReMaP is foreseen to be combined with the other
stakeholder initiatives in nutrition, based at the EU and national levels; MS will be able
to address common issues linked to food-processing multinationals jointly and more
effectively than tackling these issues alone; the midterm Best-ReMaP conference is
foreseen to be organised within the Slovene presidency in Ljubljana, jointly with the
STOP stakeholders third conference, leveraging synergies within the same subject area
funded by different EU mechanisms;
8. Addressing the dimension of health inequalities is the JA Best-ReMaP cross-cutting
topic, with high priority in the participating MS; a food systems indicator is envisaged
in EU Semester process and will also be linked to the equity dimension.
9. To support the optimal function of the immune system in protection against the Covid-
19 disease, foods in the diets of children and adolescent should be of high quality and
nutritional value. The self-isolation periods could decrease the availability of fresh food
products and lead to replacement with processed food items with longer shelf lives.
Actions to increase the availability of healthier processed foods options on the market
are especially valuable in the Covid-19 situation. The consumption of the processed
HFSS foods increases the possibility of increased weight in children and adolescent if
pandemic situation persists for a longer period of time, while increasing the risk of
metabolic diseases, especially in vulnerable populations.
EU Member States have made substantial progress in implementing policies to tackle unhealthy
diets in previous years. Building on these achievements, the JA Best-ReMaP will contribute to
the children health outcomes from the short-, medium- and long term perspectives (prevention
of chronic diseases via prevention of obesity by changing obesogenic environments). The JA
gives participating MS an opportunity to harmonise and implement EU legislation56,57 and to
(re-)define sectoral policies influencing childhood obesity while impacting nutritional habits via
healthier food offer at the common EU market.
A summary of how the Best-ReMaP JA avoids possible duplications with actions at the EU level:
The Horizon 2020 consortium of the STOP project will collaborate with the JA Best-ReMaP,
where the whole range of stakeholder mapping from all societal fields was conducted and all
the existing initiatives at the EU level have been analysed. The same stakeholder network will
be approached in both projects and a joint conference within the scope of the Slovene
presidency to the EU will be organized to upgrade and capitalise on the possible synergies.
Possibly, a third, CO-CREATE Horizon 2020 project consortium will also act in collaboration.
Governmental, Member States initiatives are linked via the competent authorities in the
individual MS, via HLG on nutrition and via SGPP. The three good practices that are to be
implemented in the JA Best-ReMaP were selected in a robust process in the MS governed
mechanisms and structures. WP4 will focus to the sustainable policy mechanisms and will
concentrate mainly to the policy decision making EU stakeholders, complementary to WP2. In
addition, it will contribute to the identification of the stakeholders that are relevant for the
public health driven policy making processes in the participating countries, linked to the
56 https://ec.europa.eu/info/policies/public-procurement_en
57 http://data.consilium.europa.eu/doc/document/PE-33-2018-INIT/en/pdf
Date: 09/07/2020 21 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
activities of WP5, WP6 and WP7. The work will be benefiting from the WP10 of the H2020 STOP
project.
4.3 Pertinence of Geographic Coverage
The Best-ReMaP JA will have a very broad geographical coverage and will include Associated
Partners from 24 European countries eligible for the EU Health Programme.
The sustainability action of the present JA will involve the majority of the EU Member States,
key European political and technical institutions in the field of health and several European
networks of public health institutions. Moreover, an alignment with other current EU-funded
projects will be ensured. The southeast European potential candidate/accession countries are
also included in the JA (Bosnia and Herzegovina, Serbia), who both currently operate outside of
the EU food environment.
Map showing countries participating in the Best-ReMaP JA with
Associated Partners, marked in green.
4.4 Context of the project work
The relationship between human beings and food is very complex, diverse and culturally
sensitive. Individual and group relationships with food and the value and cultural connotations
attributed to food and eating habits vary amongst Member States.
On one hand, social representations of foods and foodstuffs could be considered as predictors
of consumer behaviours. On the other, the complex obesogenic environment substantially
influences individual food choices. Policies that influence obesogenic environments in individual
Member States are less effective than joint EU policies because of the cross border marketing
influences, widespread trade of highly processed food products and the EU food flows in the
framework of public procurement.
Findings from the Global Burden of Disease Study 2017 show that leading risk factors changed
considerably between the years 1990 and 2017. In 1990, the leading risk factors for early death
and disability (number of all-ages DALYs) were child wasting, short gestation for birth weight,
and low birth weight for gestation. In 2017, they were high blood pressure, smoking and high
blood sugar. This systematic analysis is based on more data than ever before and includes 46,749
sources used for the analysis of risk factors affecting health. Study includes also global, regional,
and national comparative risk assessment of 84 behavioural, environmental and occupational,
and metabolic risks or clusters of risks for 195 countries and territories and how risks change
according to level of development and includes a more accurate method of estimating smoking
Date: 09/07/2020 22 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
risk58. Figure 1 shows leading risk factors causing early death and disability, by gender. In 2017
they were high blood pressure, smoking, and high blood sugar.
Figure 1: Leading risk factors causing early death and disability, by gender in 2017
Most obese or overweight children now live in developing countries, where the rate of increase
has been much higher than that in developed countries and regions. The reason for this is
because of changes in dietary practices and increasingly sedentary lifestyles 59. Young people in
Europe are intensely affected, with evidence that up to one in three boys and one in five girls
aged 6–9 years is now obese 60. Prevalence is generally higher in southern European countries61.
The most recent HBSC (2013/2014) survey was conducted in 42 countries across Europe. The
report shows the latest trends in eating behaviours, obesity, physical activity and sedentary
behaviour from the HBSC study and socioeconomic inequalities across the WHO European
Region and highlights gender. Trends have previously been reported separately62,63,64,65, while
this report brings together for the first time HBSC data on obesity and obesity-related
behaviours to review the latest evidence and consider the range and complexity of factors
influencing childhood obesity66.
Across all 27 countries and regions in 2014, the mean prevalence of obesity was 4%, with the
lowest observed level among 15-year-olds girls in Ukraine (0.7%) and the highest among boys of
11 in the former Yugoslav Republic of Macedonia (14%). Among 11-year-olds, the prevalence
was greater than 10% for boys in four countries (Croatia, Greece, Portugal and the former
Yugoslav Republic of Macedonia), but only two (Greece and Italy) had a prevalence of more than
5% for girls. In the Netherlands and Norway were found the lowest levels of obesity66.
In the vast majority of countries and regions and across all survey years, obesity prevalence was
higher among younger than older adolescents and generally was higher in boys. These patterns
reflect those observed for overweight, with higher rates among boys and younger adolescents.
Across all HBSC countries and regions, the average prevalence of overweight and obesity
(combined) was 19%, with the highest levels mainly in southern European countries. In 2014,
levels of obesity were higher among lower-affluence adolescents in 16 countries and regions.
Patterns of social inequality among boys and girls have been shown in ten (Belgium, Denmark,
Germany, Iceland, Italy, Luxembourg, Slovenia, Spain, Sweden and Switzerland) countries.
Inequalities in obesity were observed among boys only in Latvia, the Netherlands and Slovakia,
58 Institute for Health Metrics and Evaluation (IHME). Findings from the Global Burden of Disease Study 2017. Seattle, WA: IHME, 2018.
http://www.healthdata.org/sites/default/files/files/policy_report/2019/GBD_2017_Booklet.pdf
59 Gupta N, Goel K, Shah P, Misra A. Childhood obesity in developing countries: epidemiology, determinants and prevention. Endocr Rev. 2012;33(1):48–
70.
60 Wijnhoven TMA, van Raaij JMA, Spinelli A, Starc G, Hassapidou M, Spiroski I et al. WHO European Childhood Obesity Surveillance Initiative: body
mass index and level of overweight among 6–9-year-old children from school year 2007/2008 to school year 2009/2010. BMC Public Health
2014; 14:806.
61 Ahrens W, Pigeot I, Pohlabein H, De Henauw S, Lissner L, Molnar D et al. on behalf of the IDEFICS consortium. Prevalence of overweight and obesity
in European children below the age of 10. Int J Obes. 2014;38: S99–107.
62 Vereecken C, Pedersen TP, Ojala K, Krolner R, Dzielska A, Ahluwalia N et al. Fruit and vegetable consumption trends among adolescents from 2002
to 2010 in 33 countries. Eur J Pub Health 2015;25(Suppl. 2): S16–9.
63 Ahluwalia N, Dalmasso P, Rasmussen M, Lipsky L, Currie C, Haug E et al. Trends in overweight prevalence among 11-, 13- and 15 year-olds in 25
countries in Europe, Canada and USA from 2002 to 2010. Eur J Public Health 2015;25(Suppl. 2):28–32.
64 . Bucksch J, Sigmundova D, Hamrik Z, Troped PJ, Melkevik O, Ahluwalia N et al. International trends in adolescent screen-time behaviours from 2002–
2010. J Adol Health 2016;58(4); 417–25.
65 Kalman M, Inchley J, Sigmundova D, Iannotti RJ, Tynjälä JA, Hamrik Z et al. Secular trends in moderate-to-vigorous physical activity in 32 countries
from 2002 to 2010: a cross-national perspective. Eur J Public Health 2015;25(Suppl. 2):37–40.
66 http://www.euro.who.int/__data/assets/pdf_file/0019/339211/WHO_ObesityReport_2017_v3.pdf?ua=1
Date: 09/07/2020 23 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
and among girls only in Estonia, Finland and Portugal. No countries or regions showed a
significantly higher prevalence of obesity among higher-affluence adolescents66.
Trends over time shows that prevalence of obesity has increased in 16 of the 27 countries and
regions between 2002 and 2014. While a significant increase in obesity was seen in one or more
age and gender groups, only a few countries (Estonia, Latvia, Poland and the Russian Federation)
showed a consistent pattern of a significant increase in one or both genders in all three age
groups. These countries had a relatively low prevalence in 2002. A significant decrease in obesity
among 13-year-old boys showed one country – Norway. Trends in Spain varied by age and
gender, such that a significant increase was observed among 13- and 15-year-old girls but
decreased prevalence was seen in girls aged 11; there was no change for boys. The remaining
countries and regions showed relatively stable obesity prevalence between 2002 and 201466.
An important contributor to overweight and obesity among children and adolescents are poor
eating habits. Young people across Europe consume high levels of fast food and sugar-
sweetened beverages and spend less time eating meals with family than was the case for
previous generations67. While several countries and regions have shown an increase in vegetable
and fruit consumption in recent years, a large proportion of adolescents still do not meet the
current dietary recommendation of five portions daily68. As young people move through
adolescence, healthy eating becomes less common, with decreasing consumption of fruit and
vegetables and higher consumption of sweets and soft drinks 69. Intake of free sugars, especially
through sugar-sweetened beverages, is a concern in relation to overweight and obesity as it
contributes to increased overall energy intake. Consumption of products high in free sugars may
also reduce intake of healthier less energy- and more nutrient-dense options 70.
The HBSC study measure important indicators of a healthy diet, such as fruit and vegetable
consumption, and common elements of young people’s food culture, including sweets (candy
or chocolate) and sugary soft drinks (one type of sugar-sweetened beverage). In the year of
2014, only around a third (38%) of adolescents aged 11, 13 and 15 years from 40 countries and
regions in Europe reported consuming fruit daily, while 3% claimed to never eat fruit. In Armenia
(57%), Albania (51%) and Belgium (French) (49%) was the Daily fruit consumption the highest,
and lowest in Sweden (27%), Latvia (26%) and Finland (24%). It was significantly lower in boys
(34%) than girls (42%) and decreased with age (44%, 37% and 33% in 11-, 13- and 15-year-olds
respectively). Daily fruit consumption in 2014 was over 10 percentage points higher among
adolescents from higher affluence families compared to those with lower affluence, a finding
that was consistent across countries and regions66.
Thirty-six % of adolescents aged 11, 13 and 15 years reported consuming vegetables daily in
across all 40 countries, but 5% claimed never to eat vegetables. In Belgium (French) (56%),
Belgium (Flemish) (54%) and Ukraine (53%) was the highest proportion of adolescents
consuming vegetables daily, and lowest in Spain (23%) and Estonia (24%). Daily vegetable intake
among boys (32%) was lower than for girls (39%) and decreased between the ages of 11 and 15
(from 38% to 34%). A higher proportion of adolescents from higher-affluence families reported
daily vegetable consumption in almost all countries and regions, with an overall difference of
around 10 percentage points66.
Trends over time shows that across Europe, a very small yet statistically significant increase in
daily fruit consumption (from 34% to 37%) was seen between 2002 and 2014. The largest
increase had Ukraine, from 25% to 47%, with half the change occurring since 2010. There was
67 Duffey KJ, Huybrechts I, Mouratidou T, Libuda L, Kersting M, De Vriendt T et al. Beverage consumption among
European adolescents in the HELENA study. Eur J Clin Nutr. 2012;66(2):244–52.
68 Vereecken C, Pedersen TP, Ojala K, Krolner R, Dzielska A, Ahluwalia N et al. Fruit and vegetable consumption trends
among adolescents from 2002 to 2010 in 33 countries. Eur J Pub Health 2015;25(Suppl. 2):S16–9.
69 Inchley J, Currie D, Young T, Samdal O, Torsheim T, Augustson L et al., editors. Growing up unequal: gender and
socioeconomic differences in young people’s health and well-being. Health Behaviour in School-aged Children
(HBSC) study: international report from the 2013/2014 survey. Copenhagen: WHO Regional Office for Europe; 2016
(Health Policy for Children and Adolescents, No. 7 (http://www.euro.who.int/__data/assets/pdf_file/0003/303438/HSBC-No.7-Growing-up-unequal-
Full-Report.pdf, accessed 27 January 2020).
70 Guideline: sugar intake for adults and children. Geneva: World Health Organization; 2016
(https://apps.who.int/iris/bitstream/handle/10665/149782/9789241549028_eng.pdf;jsessionid=B98F42646D9ACA0B192B29718601D90F?seq
uence=1, accessed 27 January 2020).
Date: 09/07/2020 24 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
also a significant increase among 11-, 13- and 15-year-old boys and girls in a further seven
countries and regions (Austria, Belgium (French), Denmark, Lithuania, the Russian Federation,
Switzerland and United Kingdom (England)). An additional seven (Estonia, Iceland, Ireland,
Latvia, the Netherlands, Norway and Slovakia) showed improvements in fruit consumption in
both genders, but increases were not statistically significant within all age groups. Daily fruit
consumption remained unchanged for boys and girls in four countries (Croatia, Slovenia, Spain
and Sweden) between 2002 and 2014. Significant decreases were observed in boys and girls in
five countries (Greece, Israel, Malta, Poland and Portugal). Findings from the remaining
countries and regions were mixed within the age and gender groups. Overall, across 36 countries
and regions in Europe, there was a small but significant increase in daily vegetable intake, from
30% in 2002 to 35% in 2014. The largest increases in vegetable intake over time, of around 15
percentage points, reported adolescents in Denmark, Hungary and Malta. A few countries and
regions (Belgium (Flemish), Czech Republic, France, Portugal, the Russian Federation and
Slovenia) showed no change in consumption over time, and a minority a decrease over time in
both genders (Germany and Poland) or in boys only (Latvia and Lithuania). The largest decreases
in daily vegetable consumption (of seven percentage points) reported Germany and Poland 66.
Nineteen per cent of adolescents aged 11, 13 and 15 years from 40 countries and regions in
Europe reported daily consumption of sugared soft drinks in 2014, while 11% claimed never to
drink them. In Malta (37%), Belgium (French) (36%) and Bulgaria (34%) was the highest
proportion of adolescents consuming soft drinks daily, and lowest in Finland (3%), Iceland (5%)
and Greece (5%). Daily intake was marginally higher in boys (21%) than girls (17%) and in older
age groups (20% of 13- and 15-year-olds, compared to 16% of 11-year-olds). Overall, young
people from higher-affluence families were less likely to drink sugared soft drinks every day than
those with lower affluence. This was not consistent across all countries and regions. In 2014,
approximately one quarter (26%) of adolescents reported eating sweets (including chocolates)
daily, with only 4% never eating sweets. The proportion reporting daily sweets consumption
varied considerably between countries and regions and was highest in Armenia (53%), Bulgaria
(44%) and Belgium (French) (40%), and lowest in Iceland (3%), Finland (3%) and Sweden (4%).
Daily consumption was lower among boys (24%) than girls (27%) and slightly lower for 11-year-
olds (24%) compared to those of 13 and 15 (27% and 26% respectively)66.
Adolescents from higher-affluence families were more likely than those of lower affluence to
eat sweets daily in around a third of countries and regions. The association was significant for
boys and girls in Latvia, the Republic of Moldova, the Russian Federation and Ukraine. The
opposite association was found in only two countries: boys and girls in Hungary and girls in
Slovakia from lower-affluence families were more likely to eat sweets daily66.
Trends over time shows, that daily soft-drinks consumption, reported by adolescents across 32
European countries and regions, decreased from 29% in 2002 to 18% in 2014. A decline was
observed in almost all countries and regions and among boys and girls, but no significant change
in consumption over time was seen for either gender in France and Luxembourg, for girls in
Belgium (French), Malta and Poland, and for boys in Hungary and Lithuania. Countries with the
greatest overall decreases (>20 percentage points) were Ireland, Israel, Slovenia, United
Kingdom (England) and United Kingdom (Scotland). No country reported a significant increase
in daily soft-drinks consumption among boys and girls across all three age groups in any of the
survey years. Overall, between 2002 and 2014, there was a small but significant decrease in daily
consumption of sweets among European adolescents. The proportion of adolescents who ate
sweets every day decreased from 30% in 2002 to 24% in 2014. There was a significant decrease
in eating sweets daily across this time period in 29 of 36 countries and regions. The decrease in
most was seen in both genders, but was significant only among boys in five and girls in one. The
largest decreases (>20 percentage points) had Malta (32%) and Ireland (24%). Daily sweet
consumption increased among boys and girls in Austria and the Russian Federation, and for girls
only in Switzerland66.
The WHO European Childhood Obesity Surveillance Initiative (COSI) factsheet shows the
prevalence of severe obesity in school-aged children from 21 countries participating in the first
Date: 09/07/2020 25 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
three rounds of COSI (2007/2008 – 2009/2010 – 2012/2013). Severe obesity in children is
defined by WHO using reference growth curves. Results from 636,933 children (323,648 boys
and 313,285 girls) indicate that the prevalence of severe obesity varied greatly among countries,
and was highest in Southern Europe. Severe obesity prevalence ranged from 1.0% in Swedish
and Moldovan children, to 5.5% in Maltese children. In many countries, one in four obese
children was severely obese. The prevalence of severe obesity was generally higher among boys
compared to girls. The trend between 2007 and 2013 and the analysis by child’s age did not
show a clear pattern. Severe obesity was more common among children with a lower maternal
education level71.
Changes over time - since COSI started in 2007, 12 countries have participated in at least 3
rounds of data collection. A significant decrease in the prevalence of both overweight and
obesity was recorded in Greece, Italy, Portugal and Slovenia. A decreasing tendency was also
observed in Ireland and Spain. Belgium, Czech and Norway have stable prevalence; whereas the
picture is less definite in Bulgaria, Latvia and Lithuania. An increasing tendency in obesity was
observed among Latvian girls and Bulgarian boys. A similar pattern has been recorded among
Lithuanian boys for both overweight and obesity72.
The dialogue we foresee within the JA between the scientific and stakeholder community, above
all the policy decision makers from all the Member States, will ensure that the culture, the
traditions and the specific customs (also including religious and ethical aspects) of each Country
and/or Region will be taken in account in transferring the JA outputs into outcomes and policies.
5 METHODS AND MEANS
The Best-ReMaP JA will focus on the following methods:
1. Literature review: This method will be used as a research method in all cases where
exploration of the up-to-date literature will be necessary to provide an insight into the
most recent developments in the JA subject areas; expert groups will be created in order
to provide a broad base for the review and also for the sound assessment of the results.
2. Expert panels: In addition to analyses and literature reviews, there will be also be
additional assessments of the results through extensive consultation within expert
panels with involvement of additional experts, when necessary.
3. Training and knowledge and best practice transfer workshops will be developed to
bringing together experts and stakeholder groups. Special attention will be paid to the
translation of the developed materials in different languages to facilitate national use.
4. Interviews (semi- structured): This method will be used to gather information from
experts and from national focal points/national inter-sectoral working groups in the
nutrition field to better understand what makes an initiative sustainable and
implementable.
5. Local stakeholder forums will be organised as a cost-effective means of engaging a
substantial number of different stakeholders in the EU, from a vast majority of the
national environments, providing for a local/national/regional focus.
6. Policy dialogues will be employed as a forum for discussions for policymakers and other
stakeholders, in order to discuss JA developments, challenging policy issues and
recommendations at the strategic level.
7. Implementing novel approaches for testing and piloting of various theoretical models
and best practices in real-life applications at regional and national level will be
employed, especially in the area of marketing and public procurement.
71 http://www.euro.who.int/__data/assets/pdf_file/0019/400654/COSI-Severe-Obesity-FS-ENG-LowRes.pdf?ua=1
72 http://www.euro.who.int/__data/assets/pdf_file/0006/372426/WH14_COSI_factsheets_v2.pdf?ua=1
Date: 09/07/2020 26 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
8. Snapshots: Snapshots, according to the JANPA Methodology and for the 5 priority food
groups, entail that volunteer countries collect data on food products by taking product
pictures and encoding nutritional data provided on labels of processed food. A
preparatory training will be organised to present and explain the methodology and the
food classification Guidelines for all participants.
9. JRC food database, will be explored for the possibility of comparing it with the EFSA
food intake database, which includes socio-economic data of food intake.
10. Use of the EU governance mechanisms in HiAP approach, in different forms and
modalities of action, such as the High-Level Group on Nutrition and Physical Activity,
Steering Group on Prevention and Promotion and indicators of European Semester
process
Wherever possible and based on past experience, the Best-ReMaP JA will strive to use already
existing evidence bases in the area of food, nutrition, stakeholder engagement and health within
an “all policies approach”, as the foundation for further work and outputs rather than
conducting new exercises in evidence building.
WP(s) will be linked through JRC Food database at the national and EU levels, ensuring all core
WP(s) 5 – 7 will operate with comparable set of food parameters (ingredients and nutritional
intake).
6 EXPECTED OUTCOMES AND BENEFITS OF THE PROJECT
The Best-ReMaP JA aims to achieve several significant outcomes, giving the Member States an
opportunity to set evidence-based policies on childhood nutrition:
- Changing the food environment for children in Europe by providing the first/second
monitoring snapshot for food reformulation in the interested participating Member
States, assuring the Member States two snapshots within a reasonable timeframe in
order to also assess trends in food reformulation. Best reformulation practices with high
impacts on nutrient intakes will be identified by Member States, contributing to a
decrease in the salt, sugar and fat contents of processed food and on nutrient intakes of
consumers. Member States will be encouraged to maintain sustainable monitoring of
food reformulation over time.
- Reducing the impact of harmful marketing of foods to children in the EU by harmonising
policies to tackle childhood obesity across the EU Member States: (1) by a harmonised
MS approach in transposition of AVMSD to national contexts; (2) harmonised use of the
WHO Europe nutrient profile model in the MS; (3) providing harmonised (digital)
marketing monitoring protocols, based on the WHO CLICK tool and Nordic monitoring
protocol.
- Improving the quality of menus in the kitchens of public institutions by ensuring
transparent higher quality of the procured foods, while jointly implementing one public
tender, for one food group, in the (selected) piloting public institutions in the interested
MS, and in the long-term, at the national/regional levels and at the EU level.
- Production of the Food Information Database with working title “JRC food database”,
which will ensure the sustainability of data collection on food reformulation at the EU
and national levels and of monitoring trends in food reformulation; if feasible the JRC
food database might also be used for the public procurement quality criteria and for
profiling foods that are eligible for marketing to children.
- Building on the networks of stakeholders in the field of nutrition at national and EU
level, while enabling a number of dialogues and opportunities to share, learn and
comment on the policy implementation processes.
Date: 09/07/2020 27 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
7 WORK PACKAGES
7.1 Overview of Work Packages (WPs)
WP No. WP Title WP Description
Actions undertaken to manage the project
WP 1 Coordination of the action and to make sure that it is implemented as
planned
Actions for ensuring that the results and
deliverables of the project will be promoted
to all of the identified target groups: including
professional audiences (e.g. policy makers,
public health specialists, local and national
WP 2 Dissemination of the action
government representatives, dietitians,
industry representatives) as well as lay (child
and adult) audiences by the means of PR and
social media platforms as well as marketing
materials.
Actions undertaken to verify if the project is
WP 3 Evaluation of the action being implemented as planned and reaches
the objectives
Actions undertaken for the potential
Sustainability and integration integration in EU and national policies, with
WP 4
in national policies the aim to provide sustainability of the
recommended policy actions.
Actions undertaken for improvement of the
EU Harmonised
nutritional quality of the food offer, via
WP 5 Reformulation and processed
monitoring of food reformulation, to improve
food monitoring
the nutrient intakes of consumers
Best practices in reducing Actions undertaken to develop, pilot or
marketing of unhealthy food implement effective policies to reduce the
WP 6
products to children and pressure of marketing of unhealthy food
adolescents products to children and adolescents
Actions undertaken to contribute to higher
Public procurement of food in
quality menus, by assuring transparent quality
WP 7 public institutions – a pilot EU
of the procured foods within the selected
approach
public institutions in the interested MS
Date: 09/07/2020 28 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
7.2 Work Packages (WP) Description
WP No. 1
WP Title Coordination
Starting
M1 Ending month M36
month
Leading
NIJZ
Applicant
Applicants
1 2 2.1 2.2 3 4 4.1 4.2 5
No.
Applicants BMAS SCIENS NCP
NIJZ AGES GOeG MCA PHI-FBH PHI-RS
Acronym GK ANO HA
Person
103 1 0,5 0,5 1 1 0,5 0,5 1
Months
Applicants
6 7 8 8.1 9 9.1 10 11 11.1
No.
Applicants MoH CPH-
CIPH DVFA MoSA NIHD THL ANSES SPF
Acronym CY MUN
Person
1 1 1 0,5 1 0,5 2 2 0,5
Months
Applicants
11.2 12 13 14 14.1 15 15.1 15.2 16
No.
Applicants MoH
MRI ICH SU NIPN DoH FSAI CHDR ISS
Acronym -FR
Person
0,5 1 1 2 0,5 2 0,5 0,5 2
Months
Applicants
17 18 19 20 21 22 22.1 23 24
No.
Applicants LR
CDPC MFH RIVM SUM DGS FCNAUP NIPH IPHS
Acronym SAM
Person
1 1 1 1 1 2 0,5 1 1
Months
Objectives
The main objective of the Coordination Work Package is to ensure that the Joint Action meets
the stipulations set out in the Grant Agreement with the Executive Agency, as well as the
general and specific objectives set out in this proposal.
Detailed objectives include:
- To set up, manage and implement a Joint Action management structure with
specific working groups and set up a meeting structure for these groups (roles and
responsibilities of working groups and a corresponding meeting schedule),
- To define and implement regular communications channels and methods with all
WP Leaders and working groups in order to assess the implementation of the JA and
to identify any deviations in a timely manner,
- To set up, manage and implement the legal, financial and administrative management
of the JA,
- To ensure the scientific coordination of the JA, including systematic monitoring of
the appropriateness and effectiveness of all planned activities, ensuring timely
completion of JA deliverables, including monitoring of deliverables/milestones,
according to the work plan set out in Annex 1b of the GA and subsequent
coordination documents.
WP 1 will manage the Joint Action on a daily basis, ensuring that work on all WPs is progressing
according to the terms set out in the Grant Agreement. A detailed Project Policy will be
produced at the beginning of the JA, to be confirmed by the Steering Committee, describing
all of the detailed working methods of the JA, including management and tracking tools. The
Date: 09/07/2020 29 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
scope and remit of each working group will be defined in detail, along with a meeting schedule
and working methods for each working group. This Project Policy will form an integral annex
to the Best-ReMaP Consortium Agreement, ensuring that it is adhered to by all JA partners.
The Project Policy will serve as a one-stop, clear, easy to understand, yet comprehensive
document for all the JA partners, setting out in operational terms the working methods and
means used which will be used to achieve the objectives set out in the Grant Agreement.
The below three tasks are a brief summary of the tasks which will be defined in depth within
the Best-ReMaP Project Policy and are as follows:
Task 1.1. Joint Action Management and Meeting Structure
Task Leader: NIJZ + All Associated Partners
The Management and Meeting Structure for the JA will consist of a:
Project Management Team (PMT) as an internal working group of administrative,
financial and scientific support within NIJZ. The team will be comprised of the
Scientific Coordinator, Project Manager, Financial Officer, Secretariat,
Communications Officer, Legal Officer and researchers. The team will meet face to
face at least once per week to discuss daily management issues. The PMT will act as
liaison between all Associated Partners and CHAFEA. Key documents to be produced
include: Project Policy, Financial Policy, Consortium Agreement, Interim and Final
Reports.
Joint Action Steering Committee (SC) as the main oversight committee of the Joint
Action. The SC will be comprised of the WP Leaders, PMT, and representatives of the
European Commission as observers. The SC will be supported by academic experts
from relevant scientific fields, such as agri-food chain, national level public food
procurement, experts with specific knowledge on child legislation, as well as experts
on health inequalities. The SC will meet at least six times during the course of the JA
and will hold meetings back to back with other events where SC members are already
present. The objective of the SC will be to monitor the overall progress of the JA and
accept action plans on specific issues, where needed. The SC will discuss all issues,
which bear on the implementation of the JA, both in the realm of scientific issues as
well as administrative issues. The SC will be regularly updated and consulted on: the
progress of the JA and its WPs, activities of the coordinator at policy level, synergies
and activities carried out by the horizontal WPs 1-4, timely preparation of interim and
final reports, as well as regular updating on financial expenditure of the JA by WPs
and individual partners, where problematic. Since there is a wide remit of issues, both
scientific and technical, within the scope of the SC working group, regular web
conferences will be scheduled in order to discuss and resolve current issues (web
conferences once monthly or according to need).
General Assembly (GA) meetings consisting of representatives of all Associated
Partners and the PMT, with Collaborating Partners and possibly other related projects
and initiatives invited. The meetings will be held to discuss progress on JA objectives
with the entire Associated Partner consortium. Workshops on financial reporting will
also be part of specific meetings prior to the submission of the interim and final
reports. Four GA meetings will be held over the course of the JA.
Policy decision making forum (PDMF) as a policy advisory board to the JA, consisting
of the representatives of DG Santé, DG-Agri, DG Connect, DG Research, DG JRC , other
relevant DGs, representatives of EU Agencies and bodies such as EFSA and ERGA,
representatives of the EU Parliament, representatives of the current Presidencies, WP
Leaders will be informed on the JA progress and proposals of the institutionalised /
legislative solutions. There are three PDMF meetings planned within the JA. This
forum will act in synergy with the horizontal WPs and particularly WPs 4-7. WP 1 will
be responsible for coordinating and preparing the meeting documents for the PDMF.
Depending on the nature of the proposals, meeting documents and agenda topics,
the PDMF will be asked to provide critical feedback on the feasibility of
Date: 09/07/2020 30 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
implementation at national and EU level, with a view to the achievement of the Best-
ReMaP outcome indicators as set out in the GA. Policy briefs with EU stakeholders
will be produced in order to capitalise on the work of the PDMF and expedite
implementation, this will be done in conjunction with WP 2 and 4 (responsible for
Policy briefs production). Specific working methods will be defined in the Project
Policy.
In order to fully exploit the policy potential of both events, WP 1 will oversee the
coordination of two key conferences within the JA, in close cooperation with WP 2. A
Mid-term Conference will be organised within the Slovene presidency of the EU
Council, with participation of all Associated Partners and the PMT, representatives of
different relevant sectors, other interested EU and national stakeholders,
representatives of other related projects (i.e. STOP, CO-CREATE) and initiatives, to
present the potentials of the JA actions to the members of the PDMF and other
interested EU and MS policy decision makers. The Final Conference, to be held in
M36, will bring together all partners and JA stakeholders to discuss the final outputs
of the JA and sustainability and implementation of project outcomes.
Task 1.2. Joint Action Communications Structure
Task Leader: NIJZ + All Associated Partners
The PMT will communicate with the WP Leaders, Associated and Collaborating Partners via a
variety of methods. These include, but are not limited to: e-mail, telephone, tele-, web- and
videoconference, face to face meetings. Emphasis will be put on regular bilateral web-
conferences between the PMT and individual WPs, as well as online SC meetings. The PMT
will collaborate with WP 2 to include up to date news on the JA website, newsletters and
closed section for Associated Partners (intranet). The intranet is foreseen as a closed space
for Associated Partners and an online document repository.
Task 1.3. Joint Action Reporting and Financial Management Structure
Task Leader: NIJZ + All Associated Partners
The JA will be managed through the preparation of two detailed work plans entitled the Best-
ReMaP Financial Policy and the Best-ReMaP Project Policy (already described in the
introduction). Both documents have been referred to in Section 9.3. (Processes and Artefacts)
of the Best-ReMaP Proposal. These documents will serve as key manuals/reference
documents for all management and coordination procedures within the JA and will form
annexes to the Consortium Agreement.
The PMT will manage the submission of the Interim and Final Technical and Financial Reports
for the JA, as well as the continuous reporting requirement on the Participant Portal. In
addition to the mandatory reporting requirements, we will require Associated Partners to
submit regular six-month financial reports, in order to effectively monitor financial
expenditure. The proven project management system for financial reporting, 4pm, will be
used to compile all financial reports and track expenditure. A Best-ReMaP Financial Policy
document will be produced as a one-stop reference document for all financial management
issues for all of the JA partners, with FAQ, reporting procedures, deadlines and detailed
instructions on key reporting issues such as timesheets, monthly costs, reporting of costs
within the 4pm platform, etc.
The complementary Best-ReMaP Project Policy will serve as a guide/reference document for
all JA partners on how to track deliverables, milestones, submit interim/final reports, organise
events, hold working groups meetings, etc. A detailed GANTT chart, including all formal
milestones and deliverables and additional internal milestones and deliverables, will be
produced in order to track these key documents/events. Internal milestones and internal
deliverables will be identified for all Work Packages as an addition to the obligatory
milestones from the Grant Agreement. Internal milestones and deliverables will not only
Date: 09/07/2020 31 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
serve the Project Management Team to plan and track the progress of the Work Packages
more closely, but will also help Work Packages to stay on track for deadlines.
Deliverables linked to this WP
D1.1 Meeting minutes of the PDMF meetings (M12)
D1.2 Meeting minutes of the PDMF meetings (M24)
D1.3 Meeting minutes of the PDMF meetings (M36)
Milestones to be reached by this WP
M1.1 Best-ReMaP Kick-off Meeting – SC, GA (M 1)
M1.2 Finalised Best-ReMaP Project Policy and Financial Policy work plans (M 4)
M1.3 Signature of Best-ReMaP consortium agreement (M 6)
M1.4 Mid-term conference executed (M 14)
M1.5 Interim Report (M20)
M1.6 Final conference executed (M 36)
M1.7 Final Report (M36)
Date: 09/07/2020 32 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
WP No. 2
WP Title Dissemination
Starting month M1 Ending month M36
Leading Applicant SU
Applicant
1 2 2.1 2.2 3 4 4.1 4.2 5
s No.
Applicant
BMAS SCIENS PHI-
s NIJZ AGES GOeG MCA PHI-RS NCPHA
GK ANO FBH
Acronym
Person
9 1 0,5 0,5 1 1 0,5 0,5 1
Months
Applicant
6 7 8 8.1 9 9.1 10 11 11.1
s No.
Applicant
MoH CPH-
s CIPH DVFA MoSA NIHD THL ANSES SPF
CY MUN
Acronym
Person
1 1 1 0,5 1 0,5 2 2 0,5
Months
Applicant
11.2 12 13 14 14.1 15 15.1 15.2 16
s No.
Applicant
MoH-
s MRI ICH SU NIPN DoH FSAI CHDR ISS
FR
Acronym
Person
0,5 1 1 67 4,5 2 0,5 0,5 2
Months
Applicant
17 18 19 20 21 22 22.1 23 24
s No.
Applicant
LR FCNA
s CDPC MFH RIVM SUM DGS NIPH IPHS
SAM UP
Acronym
Person
1 1 1 1 1 2 0,5 1 1
Months
Objectives
The overall objective of WP2 is to facilitate coherent, effective and sustainable external and
internal communication of the Joint Action and to ensure that its objectives, activities, results
and deliverables are known to the stakeholders and the wider audience of the action.
Description of work
Task group 2.1. Strategic Documents
Task Leader: SU + All Associated Partners
Task 2.1.1 Stakeholder mapping and analysis
In collaboration with WP 4-7, WP 2 will identify and group stakeholders in a JA stakeholder
map. While all core work packages are expected to contribute to this exercise, it is worth to
emphasize the central role of WP4 in the process, where WP4 is in charge of recommending
the integration of the results of the JA into national policies, also by the mean of mapping the
policy decision making stakeholders at the EU and national levels. On the other hand, WP2 is
complementary carrying out a stakeholder mapping exercise of a wide range of the food and
nutrition relevant stakeholders at the EU level and in the participating member states. WP2
will integrate the results of the joint efforts of both work packages into the JA’s stakeholder
map.
In addition, WP2 will also use a few already existing stakeholder maps and recommendations
of other EU projects, primarily the JANPA, STOP and the CO-CREATE projects. While carrying
Date: 09/07/2020 33 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
out this task, a legal expert will be involved by WP2 in order to ensure that GDPR rules are
fully respected throughout the process.
Besides analysing and integrating all the above-mentioned stakeholder maps, WP2 will also
explore potential new target groups that are specific to the Best-ReMaP JA.
In the beginning of the project, an online survey will be distributed to all JA partners,
upgrading the STOP project approach73, to enable the JA consortium the translation of the
research knowledge linked to the stakeholder’s engagement in the policy practice. Qualitative
and quantitative stakeholder analysis will be conducted across core WPs and will involve all
the project partners and where relevant, other stakeholders. The results of the mapping will
be reflected in the Dissemination Strategy, including a minimum of 80 – or ideally 100-120 –
stakeholders at the EU level.
Task 2.1.2 Dissemination strategy
The dissemination strategy is to be based on the stakeholder map and the communication
strategy (below). This report is to specify the dissemination aims and objectives, detailed
activity planning, identification of the target groups, dissemination channels, the timing of the
dissemination actions and the visibility of European Union co- funding, as well as the
description on JA internal (including intranet, in line with the WP1 activities) and overall
communication.
WP2 will first build a communication strategy by collecting the JA’s core messages.
Discussions will be held with each core WP in order to define the WP’s core messages, the
timing of their publications and their key target audiences. Then the results will be matched
with the relevant stakeholders identified during the stakeholder mapping as well as with the
most suitable communication channels
The dissemination strategy will provide a strategy for internal and external communication
and stakeholder involvement. The document will also include the descriptions of the
dissemination channels related to the specific target groups, see table of Communication
channels and audiences in Task 2.2.
This document will present how all the stakeholders will get involved in the dissemination
activities especially at national level but also at European/international level, based also on
the STOP stakeholder sustainability plan (M4).
The dissemination strategy aims to ensure sustainable project results: integrating past
actions, it will build on information from the previous JANPA JA and integrate it into its own
website and other communication. To sustain Best-ReMaP results for the period after the end
of the JA, the strategy will foresee that its website is kept accessible and online long-term,
and that Best-ReMaP JA results are integrated within other websites/platforms as well.
Task 2.1.3 Dissemination reports
WP 2 will produce two reports covering the dissemination activities of the Joint Action for the
JA interim and final reports (M20, M36). This will be a data analytics driven analysis to answer
the key questions related to online communication channels: Which content resonates most
with the audience? Who are the followers of the news/information presented by the JA?
Reports will feed in to the evaluation activities of WP 3.
Task 2.1.4 Standardised visual identity
The communication of Best-ReMaP achievements across all communication channels will be
based on a standardised visual identity. The basic visual identity includes the logo and overall
house style (e.g. Word templates for reports, PPT templates, logo variations), described in the
Joint Action Corporate design manual. The action will ensure the use of the co-funding logos
and relevant disclaimers in any of the resulting products of the JA. Where possible, the visual
73
http://www.stopchildobesity.eu/results/
Date: 09/07/2020 34 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
identity will build on the visual precedent of the previous JA in the field and actions related to
the HLG on Nutrition and Physical Activity. (M4)
Task group 2.2 Communication channels & Contents Task
Task Leader: SU + All Associated Partners
This JA will produce information/messages for the professional stakeholders as well as for the
wider public who will be addressed through the channels described under Task 2.2.
Core WPs and their target groups
(final target groups to be specified during the first six months of the project)
WP name Targeted professional groups Targeted lay
audiences
WP5: Reformulation National or European organisations Nutrition conscious
and processed food interested in analysing the food offer lay audiences.
monitoring available for the population, and
measuring the impact of public health
policy interventions, including also
medical and nutritionist organizations.
WP6: Best practices in Ministries of health and wide range of Lay audiences
the field of marketing national and international conscious about the
of unhealthy food stakeholders with an interest in impact of food
products to children legislation concerning marketing of marketing to children.
and adolescents food to children, including also
relevant medical and nutritionist
organizations.
WP7:Public ● Local and national government ● Those receiving
procurement of food bodies managing public nutrition at public
in public in procurement of food to public institutions and
Institutions – a pilot their relatives
institutions.
EU approach especially parents
● National and local health, of students.
nutritionist and education ● Food suppliers.
professionals.
● Food procuring public institutions
and (local) food providers in agri-
food chain.
Communication channels and audiences
Communication channel Professional Lay
audiences audiences
Website x x
Social media x x
Newsletters x
Date: 09/07/2020 35 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
PR campaigns x x
Online informative videos, content- specific for x
certain audiences
Promotional movie I x
Promotional movie II x
Webinars x
Stakeholder forum events x
Leaflet for school-aged children x
Task 2.2.1 BEST-REMAP website
Development of a website based on discussions with Editorial Board members. This website
will provide JA and WP level information on all activities within the JA. It will also feature a
dedicated page for events as well as the newsletters (M3). From M6 onwards the website will
target a minimum of 200 page views per month. Reports are to be based on Google Analytics.
2.2.2 Newsletters
Five online newsletters will be dedicated to the professional stakeholders. Topics:
developments in core WPs, including latest published reports as well as opportunities to join
events and share tasks of the action. WP leaders will be regularly invited to submit relevant
information to WP2 for these newsletters, that is offered to the professional stakeholder
network of the project. (from M6 onwards).
Task 2.2.3 Local stakeholder forum events
Local stakeholder forum events will be organized as the mandatory activity of the JA
Associated Partners. Each partner is to organize one or two such events. Forum organisers
will receive methodological support to prepare and run these events. Forum events can be
local, regional or national, depending on the preference and local context. The events are
envisaged as small to midsize events, with around 20-70 people (based on country and
financial capacity, local aims).
Task 2.2.4 Social media
A dedicated public Facebook page will be used to reach both the professional and lay
audiences (see task 2.2 for detailed information on target audiences). The calendar of posts
for this channel would include two posts per month between M3 and M12, then one post per
week between M13 and M36.
In order to effectively promote the materials posted on Facebook, a portion of the budget will
be used for targeted promotions. This is essential to get more followers for our page and to
deliver our messages effectively, as organic growth on Facebook is extremely low these days.
We aim to get at least 500 followers for JA Facebook page in the first year, and should be on
track for 1,500 followers by the end of the JA.
Besides the targeted promotions, a minimum of 7 multipliers will be engaged to repost the
project content on a regular basis. These multipliers are typically European NGOs who are
active in the health sector.
In addition to this, it is also important to engage at least 3 influencers. Nowadays there are
niche influencers in virtually all industries and nutrition especially is an increasingly important
topic for European families, so there are bound to be many influencers in this sphere. We
Date: 09/07/2020 36 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
would primarily focus on the so called ‘micro-influencers’ as they seem to be more effective
in having an impact on their audiences compared to the so called ‘macro-influencers’.
While completing the social media activities described above, we would strongly rely on the
analytical methods of behavioural economics, as it provides valuable ideas about why people
do what they do, and how we can influence their actions. We aim to utilize this information
for delivering our messages in the most effective way that’s possible to our various target
groups, and to lead our audiences to the right thinking and right choices when it comes to
nutrition e.g. by using nudges in our posts, and finding the best time and format for posting,
when it comes to the different target groups.
Furthermore, we find it crucially important to address not only adults, but also the younger
generations. This requires communication methods that are different from the traditional
ones and can reach and gain the attention of children. Therefore, we will prepare two short
promotional films, out of which one will be specifically prepared for school-aged children. It
will be animation based, 2-3 minutes long and it will potentially address the elements of the
healthy diet. Both films will then be promoted through the project’s social media channels, by
using a portion of the promotion budget as well as the multipliers and influencers engaged.
The films will be uploaded to the JA’s YouTube channel and distributed to all of the EU member
states’ public schools through the respective countries’ Ministries of Health and/or Education.
With regards to the film prepared for children, we would prefer to make it completely
animation based or with a limited amount of text only, so it could be easily translated into all
EU languages. The film will be brought to the attention of schools across Europe and it will be
recommended that it is showcased as a part of nature, health or sports classes. A professional
framework for a discussion about the film’s content will also be provided to the teachers.
Task 2.2.5 Press releases based PR campaign
In cooperation with the core WPs, we are to lead national and EU-level PR campaigns based
on 7 rounds of communication. The first one is to take place in M3, and then every 4 months
from year 2 of the project. The final content and schedule of these 7 rounds of communication
has to be discussed with and accepted by the respective WPs.
These PR materials will be disseminated by WP2 via European media, such as: Euronews,
Politico, Euractiv etc. PR materials and support for the national PR campaigns will be provided
by WP2 and sent to project partners. Partners at the national level will have the opportunity
to translate the materials to local language and promote it in national media.
Task 2.2.6 Webinars
Minimum one webinar per core WP will be organised to disseminate WP results. Target
audiences and main messages will be defined according to the dissemination strategy and
adapted to the needs of the individual core WPs. Target for minimum number of participants
per webinar is 25 people.
Task 2.2.7 General communication materials
Introductory leaflet: a piece of informational material intended for both the
professional and general public target audience. The contents will include the core
information about the JA’s overall mission, the description of the different WP’s and
the intended outcomes. The leaflet’s purpose is to promote the JA with easy-to-
understand details (M3).
Leaflet for families: A leaflet specifically prepared for school-aged children that will
consist of a maximum of 2-3 pages and explain the project’s messages that are most
relevant for them (what foods are healthy and which are not, what happens when
you eat unhealthy food, etc.). To make it appealing to and understandable for
children, the information will be presented in a cartoon form and will build on the
messages and content of the film mentioned in Task 2.5.5. This will be an online
Date: 09/07/2020 37 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
available downloadable material and could also be distributed in select schools across
Europe (M9).
General PPT presentation on the JA: A general PPT presentation for utilisation by
stakeholders and partners, in English and available for translation to national
languages. The contents and aims of the presentation will be similar to the
introductory leaflet but in a PPT format (M6 with on-going updates in M20).
Layman project report: The Layman report is intended for the general public. This
succinct and easy to understand report will provide a general and brief overview of
the JA, the mission of the various WP’s and the outcomes in layman terminology. It
will include the summary of the project’s scope and objectives, description of the
methodology, presentation of the JA outputs and outcomes and transferability of
results (M36).
Task 2.2.8 Internal communication - Intranet
Internal communication will serve to harmonise dissemination activities amongst the JA
partners, including participation in Joint Action level events. A dedicated internal space for JA
partners, i.e. repository will be provided. At least 70% percent of the project partners should
become users of the JA intranet.
By carrying out the above mentioned tasks under Task 2.2 WP2 will facilitate coherent,
effective and sustainable external and internal communication of the Joint Action and it will
ensure that its objectives, activities, results and deliverables are known to the stakeholders
and the wider audience of the action.
Deliverables linked to this WP
MD 2.1 Introductory leaflets (M 3)
MD 2.2 Website (M 3)
D 2.3 Dissemination strategy (M4)
MD 2.4 Mid-term report on Dissemination (M 20)
D 2.5 Promotional movies completed (M36)
MD 2.6 Layman version of the final report (M 36)
MD 2.7 Final report on Dissemination (M 36)
Milestones to be reached by this WP
M 2.1 6th Newsletter issued (M 35)
M 2.2 Webinars to disseminate WP results completed (M 36)
Date: 09/07/2020 38 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
WP No. 3
WP Title Evaluation
Starting month M1 Ending month M36
Leading Applicant THL
Applicants
1 2 2.1 2.2 3 4 4.1 4.2 5
No.
Applicants BMAS SCIENS PHI-
NIJZ AGES GOeG MCA PHI-RS NCPHA
Acronym GK ANO FBH
Person
5 1 0,5 0,5 1 1 0,5 0,5 1
Months
Applicants
6 7 8 8.1 9 9.1 10 11 11.1
No.
Applicants MoH CPH-
CIPH DVFA MoSA NIHD THL ANSES SPF
Acronym CY MUN
Person
1 1 1 0,5 1 0,5 50 2 0,5
Months
Applicants
11.2 12 13 14 14.1 15 15.1 15.2 16
No.
Applicants MoH
MRI ICH SU NIPN DoH FSAI CHDR ISS
Acronym -FR
Person
0,5 1 1 2 0,5 2 0,5 0,5 2
Months
Applicants
17 18 19 20 21 22 22.1 23 24
No.
Applicants LR FCNA
CDPC MFH RIVM SUM DGS NIPH IPHS
Acronym SAM UP
Person
1 1 1 1 1 2 0,5 1 1
Months
Objectives
The general objective of this WP is to ensure that JA is implemented as planned and that it
accomplishes the objectives as defined in the Grant Agreement. Therefore, it aims to:
1. Develop the evaluation strategy, the methodology, and necessary tools to carry
out a systematic and continuous monitoring of processes, outputs and outcomes
2. Supervise the time schedule and work progress related to the evaluation.
3. Support the JA by monitoring the progress of the work packages in relation to the
given Joint Action timetables, and if necessary, intervene and recommend
corrective activities.
4. Coordinate and carry out the evaluation according to the plan, and prepare and
publish interim evaluation report and final evaluation report.
Description of work
Work Package 3 (WP3) is responsible for evaluation of the Joint Action. Continuous evaluation
is an instrument to ensure the achievement of the proposed objectives. The focus is on
evaluation strategies which are practical and ongoing, and which involve all the Work
Packages in order to support them in their work and in achieving their objectives. The WP3
will work in close collaboration with the WP1, as well as the Steering Committee of the JA.
The evaluation will have two major components; monitoring of the implementation and the
impact of the implementation. For both aims, a set of indicators with supporting data
collection methods will be finalised. The data collection methods will include self-
administrated online questionnaires, interviews with WP leaders, as well as an external
review to provide a stakeholder assessment of the JA implementation, quality and impact.
Date: 09/07/2020 39 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
The evaluation will be based on both internal self-assessments of the activities and impacts,
as well as on an external evaluation. The external evaluation will be subcontracted to non-
participating institutions with expertise of JA evaluation. The external evaluators will advise
will advise on the evaluation strategy and peer-review all WP3 activities and reports,
providing independent feedback to ensure the validity of WP3 assessment.
Task 3.1: Monitoring and Evaluation strategy
Task Leader: THL+ All Associated Partners
1. To develop the overall evaluation strategy and plan for the activities in the JA, so that any
potential problems or delays and their causes in relation to the plan can be identified early on
and corrective measures can be implemented. The strategy will be developed together with
the work package leaders, in order to determine which parts of the WPs evaluation should be
focused on. The strategy will outline the overall evaluation plan with detailed methodology
for data collection and analyses. Data collection will include a number of online
questionnaires for the WP leaders. Evaluation will cover both the horizontal (Management
and Dissemination) and the vertical WPs. The draft evaluation strategy will be developed
during the early stage of the JA. (M3)
2. Finalization of the evaluation plan: At this stage, details of the evaluation process including
details on methodology, tools, data-collection, indicators, processes and deadlines will be
finalized. Support material for the necessary data collection (interviews, questionnaires etc.)
will also be finalized at this stage.
The subcontracted external evaluators will contribute to the development and finalization of
the evaluation strategy. (M5)
Task 3.2: Continuous and interim evaluation
Task Leader: THL+ All Associated Partners
3. Implementation of the evaluation includes systematic evaluation of the timeline, processes,
quality and outcomes of the work. Reporting of these and recommendations about any
potential corrective actions will be done periodically within the JA timeline (e.g. Joint Action
working group meetings and Steering Committee meetings), and in the Mid-term Evaluation
Report (M20).
Continuous evaluation will be based on self-assessment of the WP activities. Data collection
methods will be put into place to gather the required information for monitoring and
evaluation. This will include surveys to assess progress within the individual WPs concerning
implementation, feasibility and quality of the work, as well as satisfaction with the JA overall
progress and activities. Special focus within the continuous evaluation will be on the
monitoring and management of the anticipated risks and the contingency planning and
implementation throughout the JA within the individual WPs, especially in the new Covid-19
pandemic. Any possible modifications and refinements in the evaluation plan and processes
will be done based on the experiences of the evaluation activities during the early stages of
the JA.
The interim report will also include a critical review of the evaluation strategy based on the
experiences during preparation of the interim report. Based on this review, a revision will be
made to the evaluation strategy, if needed.
The subcontracted external evaluators will contribute to the data collection, reporting and
reviewing the Mid-term evaluation report (M20).
Task 3.3: Final evaluation report
Task Leader: THL+ All Associated Partners
Upon the completion of the Joint Action, WP3 will be responsible for publishing an overall
evaluation report of its activities and achievements. The final evaluation report will include a
critical review of the activities, processes, achievements and results of all the work packages
in relation to the overall objectives of the JA. Joint action partners will be invited to self-
Date: 09/07/2020 40 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
evaluate their own work and assess the results of it in relation to the joint action deliverables.
(M36)
In addition to the internal evaluation which is mainly based on a critical review of self-
assessment of the JA activities, feasibility, efficacy and results, the subcontracted external
evaluators will be involved in drafting the final evaluation report. The aim of this is to include
an independent review from the stakeholders on the relevance and effectiveness of the JA.
(M36)
Deliverables linked to this WP
D3.1 Evaluation strategy (M 5)
MD3.2 Mid-term report on Evaluation (M 20)
MD3.3 Final Evaluation report (M 36)
Milestones to be reached by this WP
M3.1 Selection of external evaluators (M 1)
M3.2 First meeting with the external evaluators (M 4)
M3.3 Completed outcome evaluation with external evaluators (M 36)
WP No. 4
WP Title Sustainability and Integration in National Policies
Starting
M1 Ending month M36
month
Leading
ISS
Applicant
Applicants
1 2 2.1 2.2 3 4 4.1 4.2 5
No.
Applicants BMAS SCIENS PHI-
NIJZ AGES GOeG MCA PHI-RS NCPHA
Acronym GK ANO FBH
Person
13,5 1 0,5 0,5 1 1 0,5 0,5 1
Months
Applicants
6 7 8 8.1 9 9.1 10 11 11.1
No.
Applicants MoH CPH-
CIPH DVFA MoSA NIHD THL ANSES SPF
Acronym CY MUN
Person
1 1 1 0,5 1 0,5 2 2 0,5
Months
Applicants
11.2 12 13 14 14.1 15 15.1 15.2 16
No.
Applicants MoH
MRI ICH SU NIPN DoH FSAI CHDR ISS
Acronym -FR
Person
1 1 1 2 0,5 2 0,5 0,5 38
Months
Applicants
17 18 19 20 21 22 22.1 23 24
No.
Applicants LR FCNA
CDPC MFH RIVM SUM DGS NIPH IPHS
Acronym SAM UP
Person
1 1 1 1 1 2 0,5 1 1
Months
Objectives
The aim of the WP 4 is to foster the transfer and integration of the results and outcomes of
the core WPs into national and European policies. Therefore, this WP will strongly collaborate
with the core WPs; and the outcomes regarding food reformulation, food marketing and
advertising to children and adolescents and public procurement will be brought for discussion
to the High Level Group on Nutrition and Physical Activity (HLG). The coordinator of the JA
Date: 09/07/2020 41 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
and the WP4 leader will report regularly to the HLG about the results of the JA. In addition,
each core technical WP will have a corresponding subgroup of HLG (reformulation already
existing, procurement and marketing to be constituted), working in line with the three
corresponding Framework on Action documents (defined in WPs 5, 6 and 7). These subgroups
will be supported by EU external experts and will discuss specifically the translation of the
outcomes into the public health initiatives.
Steering Group on Prevention and Promotion will also be regularly informed about the
progress of actions.
Then, the outcomes will be channelled into a series of events (as indicated in Tasks 4.2, 4.3.
and 4.4.), both at European level and MS level. These events will primarily involve policy
decision makers, but in a second round will allow for a public health driven dialogs and will
include also a wide range of stakeholders from different societal spheres, including also
private sector stakeholders, such as food producers and retailers.
To pave the way for the policy decision maker’s discussions, we will first prepare a ‘Draft
Integration and sustainability plan (Report on sustainability and integration in national
policies) 74’.
The following step will be policy decision making stakeholder mapping in each country. This
information will be completed with a list of relevant policies and infrastructures identified in
the core WPs for each participating country and at European level taking into account the
differences in the legislative and policy context.
Next, representatives of European Institution and Member states will set up policy dialogues
on the legislative and policy opportunities identifying the next steps. Discussions will run both
at national and European level to facilitate experience sharing within and between different
countries. The meeting outcomes, with the policies that the MS will commit to transfer into
their national guidelines and normative, will be summarized in briefs.
Joint activities in increasing the governance mechanisms of core work packages will be
merged in WP4, such and Joint Research Centre food database, possible Council Conclusions
and possible Food systems indicator in the European Semester.
The EU-added value of this JA will be supporting the EC and the MSs in attempt modifying the
obesogenic food environment and making the healthy food options more accessible to
European children and adolescents and their caregivers, as EU citizen.
Description of work
Task 4.1 Building on the outcomes of other JAs and initiatives
Task Leader: ISS + All Associated Partners
This task will build on the knowledge and outcomes of previous and ongoing European
initiatives and key strategic documents, to give the present JA a solid base. The initiatives and
documents that will be considered, among others, are:
1. the final recommendations of the Joint Action on Nutrition and Physical Activity (JANPA),
2. existing reports summarizing the EU Semester processes and options regarding
sustainability and SDGs,
3. the conclusions of the meetings of the High-Level Group on Nutrition and Physical Activity
and of the Steering Group on Prevention and Promotion,
4. the indications of the “Farm to fork” strategy of the European Commission,
5. EU Cancer beating plan
6. the Presidencies’ Council conclusions and the roadmaps of the European Presidencies (e.g.
use of the Austrian Presidency Food system roadmap, Dutch roadmap on reformulation) and
options for a new Childhood Obesity Action Plan,
74 CHAFEA_3HP_JA-_Proposal-Template-v2
Date: 09/07/2020 42 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
6.the guidelines and options regarding the European Structural Support Services for potential
support to Member States beyond the Best-ReMaP Joint Action,
7. New postCovid-19 Europe4Health plan and relevant others.
The methodology of this task will include desk research to identify facilitating and hindering
factors for the sustainability of the project (annexed in Integration and sustainability plan).
This desk search will be carried out on the official websites of the EU institutions and the MS,
the dissemination websites of the JAs and the archives of the scientific peer-reviewed
literature. The initial search keywords will be: food indicators, EU semester process, childhood
obesity prevention, food environment, policy.
The executive abstracts of the retrieved documents will be read and if the content is
considered within the scope of the research and of the appropriate quality level and checked
for the possible conflicts of interest. The relevant information will be extracted using a form
predisposed at the start of the activity of the task. The paper selection and the information
extraction will be carried out independently by two researchers. The above-mentioned
documents will also be analysed in order to study the priorities already set and policies
already discussed or under consideration at national and European level. At the moment, it is
not possible to foresee what and how many documents will result from the search.
The activity of the task will be completed with at least 9 semi-structured interviews (3 for
each core WP) with experts to understand what actions make an initiative sustainable. The
experts will be picked up among representatives from DG Nutrition of WHO Europe, DG Santé
of the EC, JRC and colleagues that are leading or have led the WP on sustainability of other
JAs and European projects and possible other relevant experts. Also, policy decision makers
from MS will be interviewed to understand what the national decision makers expect from
this JA.
The subcontractor will contribute to identifying and analysing pertinent key EU processes and
tools, help identify the experts to interview, with additional focus on equity and sustainability.
Task 4.2 Policy decision makers level stakeholder mapping
Task Leader: ISS+ All Associated Partners
This task will mainly identify EU policy decision makers and the stakeholders via welfare mix
(public and private, formal and non-formal, profit and non-profit), linked to the activities of
WP5, WP6 and WP7. In this task, the mapping will be focused on governmental and
institutional stakeholders (annexed in Integration and sustainability plan). The list will act as
a pool of participants for the policy dialogue events in Task 4.4. The work will be performed
in alignment with the WP10 of the H2020 project STOP and also with the INFORMAS network.
For each stakeholder, its network, the level of activity and area of interest will be described.
The modality of engagement of the MSs decision makers and stakeholders, that will be in
common with the STOP project, will be described in detail, so it will represent a sustainability
best practice to be replicate in the next JA.
Alongside this, an Advisory Board in the form of the Policy Decision Makers Forum, including
representatives of the European Parliament, European Commission (i.e. DG SANTE, DG
Research and Innovation, DG AGRI, DG Connect…) established in Task 1.1, will facilitate the
policy decision making level stakeholder involvement in the process.
A subcontractor will contribute to identifying the groups of relevant stakeholders at EU and
national levels, especially in food procurement area, exploring its network and subsequently
identifying their level of influence and level of interest.
Date: 09/07/2020 43 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Task 4.3 Actions on EU and national policies
Task Leader: ISS + All Associated Partners
The first step of the integration of relevant policies is the discussion to the High Level Group
on Nutrition and Physical Activity (HLG). The coordinator of the JA and the WP4 leader will
report regularly to the HLG about the results of the JA. With the representatives of the MSs
in the HLG, it will decide what policies resulted from the JA to be implemented in the MS. To
inform policy decision makers in that process and to allow for discussion, ‘Draft Integration
and sustainability plan’ will be prepared as the first step. The outputs of the meeting with
the HLG will be discussed among WP leaders, the JA coordinator, the sustainability WP leader
and the subcontractor, to assess the options and make recommendations on the modality to
transfer the results into EU and national policies.
Finally, the results will be then feed into the ‘Final Integration and sustainability plan’ that
will summarize the proposed policies and the modality to change existing measures at
European and MS level. The Report and the possibilities for implementation will be discussed
during the Policy dialogue briefs at task 4.4 and within the scope of the HLG. Steering Group
on Prevention and Promotion will be informed about the JA developments, too.
Task 4.4 Series of Policy dialogues
Task Leader: ISS + All Associated Partners
A series of stakeholder meetings, with the focus on policy decision makers, will be at the core
of WP4. These events will allow policy decision makers to transfer the outcomes of the core
WPs into their national and EU policies and legislation and the modality, therefore ensuring
the sustainability of the JA results. Guidelines, guidance and recommendations by public
health authorities, legislative acts, etc. will be prepared through the discussion with the
national decision makers, policy makers and other stakeholders. There will be four policy
dialogue briefs in total; a plenary dialogue with EU-level policy makers and other relevant
stakeholders, including food producers and retailers will take place by M34. The EU regions
level will also be included through three regional policy dialogues (Scandinavian/Northern,
Mediterranean and Central European regions) from M 28-33, which all the EU MSs will be
invited to.
The tentative agenda of these events, to be replicated for all the edition is: 1) Presentation of
the outcomes of the JA and the policies to be implemented – Description of the Report on
Integration (Best-ReMaP Coordinator and WP leaders); 2) Current situation in the EU/MS
involved in Policy Dialogue brief (MS representatives); 3) The stakeholders engagement; 4)
Amendments to 5) Reporting from the MSs to on the policies to be transferred into their
national recommendation, guidelines and normative.
At the end of each Policy Dialogue, a brief with the relevant conclusions for each MS will be
made available and circulated.
The aim of the final plenary event is to present information on the conclusions of the JA and
to submit the proposal for recommendations to the closest upcoming Council for Council
Conclusions, if taken further by the actual presidency member state.
The coordinator of the JA and the WP4 leader will report regularly to the HLG about the results
of the JA. In addition, each core technical WP will have a corresponding subgroup of HLG
(reformulation already existing, procurement and marketing to be constituted), working in
line with the three corresponding Framework on Action documents (defined in WPs 5, 6 and
Date: 09/07/2020 44 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
7). These subgroups will be supported by EU external experts and will discuss specifically the
translation of the outcomes into the public health initiatives.
Activities in Task 4.4. will be supplemented with those of Task 2.2.4 Local Stakeholder Forums,
promoting uptake at national level.
A subcontractor will facilitate setting the objectives with the Member States representatives
and EU stakeholders participating to the Policy Dialogue events and will produce short policy
briefs with Member States based on Best-ReMaP JA outcomes, to inform the participating
stakeholders of what has been achieved up to date in order to build on, rather than replicate,
existing work.
Task 4.5 Food information database
Task Leader: NIJZ, ANSES + All Associated Partners
Linking the results of the core WPs, a food information database with working title JRC food
database will be developed. This database will include also the pre-existing results of the
EUREMO project and JANPA and will be further upgraded with the JA Best-ReMaP inputs. The
JRC will host the data in its open access Data Catalogue and will also develop the database in
a more user-friendly manner by developing a visualisation tool (with features similar to that
of ECIS - https://ecis.jrc.ec.europa.eu/). The JRC food database will offer to the Member
States a long-lasting tool to regularly report the national data to the JRC food database and
to explore the data and make it available to researchers and public policy advisors for the
national policies and legislation. A sustainable system (with national policy encouragements
or European indicators) to keep expanding the dataset by the Member States after the
conclusion of the activities of Best-ReMaP will be defined.
WP4 will synthesize the policies, mainly monitoring of reformulation (WP5) and of
reducing (digital) food marketing to children (WP6) and public food procurement (WP7),
by exploring and developing the options to use JRC database as the source of the above
mentioned information. JRC food database will be checked for the possibility of
comparing with the EFSA food intake database, which includes socio-economic data of
food intake.
Food systems indicators will be possibly developed and the data for that indicator will
rely on the new JRC food database.
Deliverables linked to this WP
D 4.1 Documents retrieved in the desk research (M6)
MD 4.2 Integration and sustainability plan (Report on sustainability and integration in national
policies) (M36)
D 4.3 Briefs of the four policy dialogues (M36)
Milestones to be reached by this WP
M4.1 At least 6 semi-structured interviews have been carried out for Task 4.1 (M12)
M4.2 At least 3 semi-structured interviews have been implemented in relation to Task 4.1
(M18)
M 4.3 JRC implements food database (M34)
M 4.4 Four Policy dialogues completed (M36)
Date: 09/07/2020 45 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
WP No. 5
WP Title EU Harmonised Reformulation and processed food monitoring
Starting month M1 Ending month M36
Leading Applicant ANSES
Applicants
1 2.1 3 4 4.1 4.2 5 6 7
No.
Applicants SCIENS PHI- PHI- MoH
NIJZ AGES MCA NCPHA CIPH
Acronym ANO FBH RS CY
Person
17 17 28 0,5 7 7 14 14 12
Months
Applicants
8 9 9.1 10 11 11.2 12 13 14.1
No.
Applicants DVF MoS MoH NIP
NIHD THL ANSES MRI ICH
Acronym A A -FR N
Person
12 1 22 15 96,5 0,5 23 17 19
Months
Applicants
15 15.1 16 19 20 21 22 22.1 23
No.
Applicants Do
FSAI ISS MFH RIVM SUM DGS FCNAUP NIPH
Acronym H
Person
1 22 13 17 7 13 7 7 17
Months
Objectives
The aim of this work package is to share and to promote, in the different countries
participating in the work package, the best practices on how to implement a European
sustainable monitoring system for processed food reformulation.
The use of these best practices will contribute to a standardised monitoring system at the
European level to facilitate comparisons and to encourage the improvement of the nutritional
quality of the European food supply, especially for children. The identification of the best
reformulations of processed food, by analysing the trend assessment between consecutive
snapshots, stimulates food providers for the improvement of the nutritional quality of their
processed products and creates a virtuous circle at the European level, for the improvement
of the food supply.
According to the JANPA methodology, the nutritional composition, ingredients and portion
size of processed foods, provided on labels with the European Regulation N°1169/2011
(proteins, carbohydrates, salt, sugars, fats, saturated fats and energy) will be collected and
standardised. The processed food monitoring consists of the collection, encoding and
analyses of these nutritional data with several snapshots over time. This processed food
monitoring will allow the identification of the best reformulations, the evaluation of
reformulation initiatives and their impacts on nutrient intakes of consumers according to
socio-economic parameters. A focus will also be made on children. The encoding of
ingredients could also contribute to the European sustainable food products.
The sustainability of this harmonised monitoring system at the European level will be studied
with European actors (JRC, DG SANTE, High level group) and encouraged. Harmonised
sustainable Framework for Action on reformulation is already established as the subgroup of
the HLG. HLG itself could be supported by external expert group on reformulation and it will
be used as a governance mechanism in this WP, linked with WP4 (in task 4.1).
Description of work
Task 5.1: Optimization of the European harmonised processed food supply monitoring
Task leader: ANSES, Participating partners: AGES, SCIENSANO, MCA, PHI-FBH, PHI-RS, NCPHA,
DFVA, NIHD, MoSA, THL, MRI, ICH, NIPN, FSAI, MFH, RIVM, NIJZ
Collaborating partner: EFSA, ICF
Task 5.1.1: Prioritization of the processed food categories.
Date: 09/07/2020 46 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Task 5.1.1.1: The harmonized EFSA food intake comprehensive database (representative of
the national food consumption habits) will be used to assess the contribution of each food
group to the total nutrient intakes (fat, saturated fat, sugars, salt) for each country. The 10 or
20 biggest contributors (especially for children), for all countries, will make up the European
priority processed food groups to include in the monitoring. According to the data available
in the EFSA database, socio economic parameters (education level for example) will be
included in the analyses to consider vulnerable populations and inequalities. (Deliverable
D5.1).
Task 5.1.1.2: The list of the European priority processed food groups will be validated with a
consultation of each country (Deliverable 5.1). A good correspondence with the processed
foods already collected with the EUREMO project will be ensured (the 10-20 food groups will
be one part of the food list of the EUREMO project).
Task 5.1.2: Improving efficiency and sustainability of monitoring efforts
Subtask leader: SCIENSANO, participating partners: ANSES, AGES, THL, ICH, FSAI, MFH, RIVM
Collaborating partner: ICF
New digital sources of data (crowdsourcing, open databases, Foodswitchor GS1) and new
technologies (photos and text extraction) will be explored within this task. In particular, the
representativeness and the reliability of these new sources and technologies will be tested
and analysed.
The following activities are planned:
A comparison between traditional approaches to monitoring and crowdsourcing for
key food supply indicators. The Open Food Facts database will be used and for
countries with sufficient data, compared to traditional monitoring approaches (either
already existing data, or data collected through EUREMO or through task 5.3 and/or
5.4 in the current project)
A comparison between traditional approaches to monitoring and web scraping for
key food supply indicators. Only countries which have already web scraping in place
will be included and these data will be compared to traditional monitoring
approaches (either already existing data, or data collected through EUREMO or
through task 5.3 and/or 5.4 in this JA)
A comparison between traditional approaches to monitoring and GS1 for key food
supply indicators. Only countries which are already using GS1 data will be included
and these data will be compared to traditional monitoring approaches (either already
existing data, or data collected through EUREMO or through task 5.3 and/or 5.4 in the
current project)
Within the EUREMO project the feasibility of text extraction for ingredients and
nutrients from pictures of food packaging will already be tested. A more elaborated
pilot study could be conducted if the first tests are promising.
The comparison of the different sources of data will constitute a specific part of the
deliverable D5.2.
Task 5.2: MS Assistance for the Food reformulation monitoring
Task Leader: ANSES. Participating partners: MoH-FR, ISS, AGES, SCIENSANO, MCA, PHI-FBH,
PHI-RS, NCPHA, CIPH, DFVA, NIHD, MoSA, THL, MRI, ICH, NIPN, FSAI, MFH, RIVM, SUM, DGS,
NIPH, NIJZ, Collaborating partners: EFSA, JRC, DG Sante
Task 5.2.1: Organization of one workshop to disseminate the first snapshot results and to
promote JANPA methodology. All volunteer countries interested in the reformulation
monitoring will profit from the experience of countries already engaged.
Task 5.2.2: Analyses of the pre-existing data and harmonization to the JANPA/Oqali
methodology in order to include volunteer countries in the second snapshot (batch 1 or 2
according to the work to do for the harmonization to the JANPA methodology). All countries
with data already available at the branded level could standardize and harmonize their data
Date: 09/07/2020 47 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
to the Oqali/JANPA classification, to make them compatible with the JANPA methodology and
a second snapshot. A double check with ANSES will be necessary. Knowledge on food science
and food composition will be required for the execution of the task.
Task 5.2.3: Elaboration of technical guidelines for monitoring of the processed food supply
and reformulation (Deliverable 5.1). The guidelines will describe precisely the definition and
the scope of the processed food pertinent to be included in a reformulation monitoring
system (Task 5.1.1), the optimization of the reformulation monitoring (Task5.1.2 and the
monitoring methodology. The Guidelines will help countries to implement a monitoring
system over time, to assess the reformulations and their impacts on nutrient intakes. We will
experiment with the guidelines test them during the first snapshot (Task 5.3.1).
Task 5.2.4: Linked to the WP 4, encourage MS to implement first or second snapshot (national
action plan) and start developing an open European database with working title JRC Food
database. To assure the sustainability of the reformulation monitoring at the European level,
such as common tools (JRC food database, common food quality indicators), will be discussed
and key European actors will be approached (Commission, EFSA, JRC). European food system
indicator will be proposed, the same for recommendations (Deliverable 5.2).
Task 5.2.5: Organization of one workshop of restitution with stakeholders (at European level)
so that each country could present own national initiatives. The appropriation of these results
by the countries, the food providers and the European Commission, is an essential point to
include in WP 4, as a subsequent step to proceed after the end of the Best-ReMaP JA.
Task 5.3: Extension of the first European Snapshot of the nutritional quality of the processed
food
Task Leader: ANSES. Participating partners: MCA, PHI-FBH, PHI-RS, CIPH, MoH CY, FSAI, SUM
The first European Snapshot of the nutritional quality of the processed food will be extended
with volunteer countries, complementing the food offer monitoring already implemented by
the JANPA and EC-funded (EUREMO) projects.
Task 5.3.1: According to the JANPA Methodology and for the 5 priority food groups, volunteer
countries (those which have not yet been involved to reformulation monitoring activities
JANPA or EUREMO) have to collect (taking product pictures) and encode the nutritional data
provided on labels of processed food. A preparatory training will be organized by ANSES to
present and explain the methodology. The food classification guidelines previously written
(Task 2.3) will be experimented with and adjusted if needed. Knowledge on food science will
be requested for executing this task.
Task 5.3.2: According to the JANPA Methodology, involved countries have to produce
statistics by JANPA/Oqali subcategories of products. A webinar organized by ANSES, will
explain the methodology. Knowledge on statistics will be requested for executing this task. A
report by each MS will be included in the deliverable D5.3 and some of these statistics could
be presented at the final workshop (Task 2.5).
Task 5.4: Implementation of the second European Snapshot of the nutritional quality of the
processed food
Task Leader: ANSES. Participating partners: AGES, SCIENSANO, NCPHA, DFVA, NIHD, THL, MRI,
ICH, NIPN, ISS, MFH, DGS, NIPH, NIJZ
According to the JANPA Methodology and for the 5 priority food groups, volunteer countries
have to collect and encode the nutritional data provided on labels of processed food and
make a link between products collected in the first and/or the second snapshot (products
added, removed, reformulated or identical). Knowledge on food science will be requested for
executing this task. A batch1 for countries with data already available will be implemented in
2021-2022. For countries for which the first snapshot is operated by EUREMO in 2019-2020,
a batch2 will be implemented in 2022-2023 to maintain a three-year interval between two
consecutive snapshots.
Date: 09/07/2020 48 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Task 5.4.1: Batch1 of second snapshot for some volunteer countries with a first snapshot
already available and compatible with the JANPA methodology (JANPA1, others countries
with first snapshot available). A preparatory training will be organized by ANSES to present
and explain the methodology and the food classification. Guidelines previously written (Task
2.3) will be experimented with and adjusted if needed.
Task 5.4.2: Batch2 of second snapshot for some volunteer countries with a first snapshot
covered by EUREMO project. A preparatory training will be organized by ANSES to present
and explain the methodology and the food classification. Guidelines previously written (Task
2.3) will be used.
Task 5.5: Trend assessment of the nutritional quality of the processed food
Task Leader: ANSES. Participating partners: AGES, SCIENSANO, NIHD, MoSA, MRI, NIPN, FSAI,
RIVM, NIPH, Collaborating partner: EFSA
Task 5.5.1: Trend assessment of the nutritional quality of the processed food, for countries
and food categories for which old data (collected during EUREMO project for example) and
new food composition data (collected during the Batch 1 of the second snapshot) are
available. Each country participating in task 5.4.1 could assess the nutritional quality
evolutions and identify best reformulations, based on the nutrient mean values of
subcategories of products. Knowledge on statistics will be requested for executing this task.
A report by each MS will be included in the deliverable D5.3.
Task 5.5.2: Nutrient intakes changes due to the processed food reformulation, using the
comprehensive database of EFSA (limited to MS included in the batch1 of second snapshot,
for which old and new data of food composition are available at the M25). To assess the
impact on nutrient intakes (fats, saturated fats, sugars, salt) of adults and children, it will be
necessary to link nutritional composition data (JANPA/ Oqali classification of processed food)
and consumption data (Food Ex2 classification of the EFSA comprehensive database). Then,
the nutrient intakes will be estimated, using nutritional composition data issued from the first
and second snapshot respectively (Results of Task 5.1), to assess the impact of reformulations
on nutrient intakes. According to the data available in the EFSA database, the impact of
reformulation on nutrient intakes according to socio-economic status will also be studied to
assess the reformulation impacts on social inequalities. A focus will also be made on children.
Task 5.5.3: European comparisons of the processed food reformulations, based on JANPA
indicators: Impacts of the processed food reformulations and the food supply turnover
(limited to MS included in the batch1 of second snapshot). Based on the results of the Task
5.1, some comparisons of reformulations or of turnover of products, could be made between
countries. The added value of Best-ReMaP is the future possibility, for the first time in a
number of countries at the EU level, to assess the impacts of reformulation activities on
nutrients intakes in children.
Deliverables linked to this WP
D5.1 Development of the Guidelines for an European harmonised and sustainable
monitoring system of the processed food supply, consultation/temporary report (M9)
D5.2 Final Guidelines for a European harmonised and sustainable monitoring system of the
processed food supply (M30)
D5.3 Report on reformulation monitoring: monitoring implementation, reformulation
comparisons and reformulation impacts on nutrient intakes (M36)
Milestones to be reached by this WP
M5.1 Dissemination workshop on 1st snapshot results (M1)
M5.2 List of the priority food groups (M9)
M5.3 Launch of the first snapshot and guideline test (M10)
M5.4 Launch of the batch 1 of the second snapshot (M14)
M5.5 Launch of the batch 2 of the second snapshot (M22)
M5.6 Preparatory trainings for data collection and encoding (M22)
Date: 09/07/2020 49 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
WP No. 6
Best practices in reducing marketing of unhealthy food products
WP Title
to children and adolescents
Starting month M1 Ending month M36
Leading Applicant DoH and DGS
Applicants
1 2 3 4 4.1 4.2 5 6
No.
Applicants
NIJZ BMASGK SCIENSANO MCA PHI-FBH PHI-RS NCPHA CIPH
Acronym
Person
23 9 12 2 6 6 3,5 14
Months
Applicants
7 9 9.1 10 11 11.1 11.2 13
No.
Applicants MoH
MoSA NIHD THL ANSES SPF MoH-FR ICH
Acronym CY
Person
18 2 2 20 11 8 1 20
Months
Applicants
15 15.2 17 18 22 22.1 23 24
No.
Applicants LR
DoH CHDR CDPC DGS FCNAUP NIPH IPHS
Acronym SAM
Person
11 19 19 4 60,5 2,5 13 5
Months
Objectives
The objective of WP 6 is to explore, develop and share, within participating countries, the
best practices on how to implement effective policies to reduce marketing of unhealthy
food products (food and non-alcoholic beverages) to children (up to 18 years). Harmonized
monitoring and implementation tools will be developed, together with an EU Framework
for Action on Best Practises that can be implemented across participating MS via the EU
High Level Group on Nutrition and Physical Activity, so that MS can adapt and replicate and
report progress annually.
Steering Group on Prevention and Promotion will also be informed on the developments.
The EU Framework for Action will focus on implementation and monitoring actions that are
transferrable across MSs including codes of practice, designed protocols and tools to monitor
unhealthy food marketing to children and inform compliance with the Framework, together
with a key focus on digital marketing. The approaches to reducing unhealthy food marketing
to children will be considered using a health inequalities lens to guard against no widening of
the socio-economic gap.
Work Package 6, together with WP5 and WP7, has at its core changing the European food
environment by reducing marketing unhealthy food products to children, to help halt and
reduce the increase in childhood obesity as outlined in the EU Childhood Obesity Action Plan.
Achieving this will contribute towards a healthier EU workforce in future generations.
Specific objectives of WP 6 are the following:
To support the establishment of the HLG-NPA subgroup on reducing marketing foods to
children, supported by external expert group (composed of the key health EU, WHO and other
sectors experts in the field of reducing marketing of unhealthy foods to children) and MS
national intersectoral working groups with key stakeholders and experts in the field of
reducing marketing of unhealthy foods to children. A national intersectoral working group
with key stakeholders on marketing unhealthy food products to children from the health and
other sectors are foreseen in participating countries.
Date: 09/07/2020 50 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
To share and test best practices of implemented actions to reduce unhealthy food marketing
to children at the EU level and reduce children to the marketing of high fat, salt and sugar
(HFSS) foods.
To harmonise the EU MSs approach in transposition of the new Audio-Visual Media Services
Directive (AVMSD).
To develop a code of practices to reduce marketing of unhealthy food to children.
To develop, test and adapt protocols to monitor unhealthy food marketing to children with a
particular focus on digital marketing and within an approach to address health inequalities.
To deliver an EU Framework for Action of implementable best practices to reduce unhealthy
food marketing to children. This EU Framework will provide guidance for policy
implementation at national level to support the adoption of the best practices across EU MS,
with recommendations for further EU and national measures.
Description of work
Task 6.1: Establishment of the EU Expert Group and national intersectoral working groups.
Task Leader: DoH, Ireland and DGS, Portugal., Participating partners: ICH, SCIENSANO,
BMASGK, CDPC, MCA, PHI-FBH, PHI-RS, NIPH, NIJZ, CHDR, MoH CY, CIPH, MoSA, NIHD, THL,
LR SAM
Collaborating partners: WHO, OECD, JRC
An EU Expert Group will be established which will support a sub group of the EU HLG on
Nutrition and Physical Activity. Expert group will be composed of the key EU and WHO health
experts and other sectoral experts in the field of reducing marketing of unhealthy foods to
children, linked with WP4. Other sectors will include DG AGRI, DG CONNECT, DG Internal
Market, Industry, Entrepreneurship and SMEs and others. Leading experts on digital
marketing and social inequalities will also be included as well as representatives from the JRC,
WHO, OECD and MS with experiences of implementation actions in this area.
The EU Expert Group of HLG-NPA subgroup will identify effective actions on the best practices
to reduce unhealthy food marketing to children, in particular, MSs experiences on digital
marketing. The recommendations from this EU Expert Group will provide EU added value for
the development of WP tasks on transposing the new AVMSD and on the developing an EU
harmonised and comprehensive monitoring protocol for reducing unhealthy food marketing
to children.
A national intersectoral working group will be established in participating MSs. The main tasks
of each national intersectoral working group will be to analyse and discuss the adaptation of
the transposition of the new AVMSD and the implementation of the EU harmonised
monitoring protocol for reducing unhealthy food marketing to children. Successful MS actions
will form the basis for the EU Framework for Action on reducing unhealthy food marketing to
children, a key deliverable for this WP. The intersectoral working group will have public health
as its core agenda. Regular meetings, at least twice a year, will be convened and the outcome
presented at the national stakeholder workshops, linked with WP 2.
The EU Expert Group will support and guide the national intersectoral working groups in the
implementation of each task of this WP, allowing participating MSs to test or pilot protocols
and tools. MSs will feed back important data to the EU Expert Group to support the
development of the EU Framework for Action on reducing unhealthy food marketing to
children.
Date: 09/07/2020 51 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
The EU framework on reducing marketing of unhealthy food products to children of HLG-NPA
can be taken forward by MS following the end of the Joint Action and regular reporting on
progress will be through the EU HLG on Nutrition and Physical Activity.
Task 6.2: Mapping of existing regulations and legislation in EU MS
Task Leader: DoH and DGS, Participating partners: ICH, BMASGK, SPF, MOH-FR, IPHS, NIPH,
CHDR, MoH CY, CIPH, THL, LR SAM
Collaborating partners: JRC, WHO (WHO European Marketing Network on reducing marketing
pressure to children)
Task 6.2.1. Mapping of existing regulations and legislation in EU MS, linked with WP4, taking
into consideration the UN Convention on the Rights of the Child. This task will deliver a
comprehensive mapping of the existing legislation in EU MS related to reducing unhealthy
food marketing to children. The collection of up-to-date data and the information from in-
depth interviews with the national focal points for food marketing to children will provide
further recommendations and additional variables, if relevant, to the JRC report “Food and
non-alcoholic beverage marketing to children and adolescents”. This task will be conducted
to complement the work of the WHO European Action Network on Reducing Marketing
Pressure on Children, a network that is led by Portugal. A workshop will be organized to
present the state-of-the-art evidence as well as best practices identified at EU level (examples:
Ireland, Slovenia and Portugal).
Task 6.2.2. Mapping of existing evidence on the exposure extent and nature of children to
marketing of HFSS using the WHO Europe nutrient profile model. A selected overview of the
existing data on the extent and nature of food marketing to children will be prepared, linking
with research groups and EU projects working in this area, such as data obtained by WHO
expert groups, CHRODIS Joint Action; the EU Study on the exposure of children to linear, non-
linear and online marketing of foods high in fat, salt or sugar; the JRC review on marketing
practices (Food and non-alcoholic beverage marketing to children and adolescents) as well as
data obtained by INFORMAS protocol and other appropriate EU projects such as STOP project.
Task 6.3: Implementation of the transposition of the new Audio-visual Media Services
Directive (AVMSD)
Task Leader: DoH, DGS and NIJZ, Participating partners: ICH, CDPC, SPF, MOH-FR, NIPH, NIJZ,
CHDR, MoH CY, CIPH, MoSA, NIHD, THL, LR SAM
Collaborating partner: WHO
Task 6.3.1. Harmonisation of the EU MSs approach based on the transposition of the new
AVMSD to national contexts The recent revision of the AVMSD encourages the EU MS to
develop self and co-regulatory codes of practice regarding inappropriate audio-visual
commercial communications to reduce children’s exposure to unhealthy food. EU MS have to
transpose the AVMSD into national legislation. In the WP6, an EU harmonised protocol with
recommendations for that transposition of the AVMSD will be developed and will include a
proposal for an EU harmonised nutrient profile model, based on the WHO nutrient profile
model (as identified in the AVMSD) will be developed, tested or piloted by the participating
MSs. The EU harmonised nutrient profile model will be used to identify foods which may and
may not be marketed to children. to
The model may also be used for codes of practice on reducing the marketing of unhealthy
food to children
Task 6.3.1.1 Develop the guidance for an EU harmonised nutrient profile model for the
identification of foods not permitted to be marketed to children.
Date: 09/07/2020 52 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
The development of the EU harmonised nutrient profile model for the identification of foods
not permitted to be marketed to children will be based on the WHO Europe nutrient profile
model, with national adaptations if required. The country experiences of Slovenia and
Portugal in the adaptation of the WHO Europe Nutrient Profile Model to national contexts
will provide peer support in the testing of this model in the participating MS. A workshop led
by Portugal and Slovenia will be organized for the MS to share their experiences on using the
WHO nutrient profiling model.
Task 6.3.2 Support the national stakeholder dialogues in the implementation process of the
AVMSD. Information collected by the STOP project, which identifies the positions of different
stakeholder groups towards the marketing of unhealthy foods to children and possible
measures for consideration will be used to inform this process. A workshop to guide the
interested MSs will be organized to present these country experiences and the data obtained
by the STOP project and other sources. The aim of this task will be to provide stakeholder
understanding and support to the AVMSD implementation process in terms of reducing
unhealthy food marketing to children.
Task 6.4: Development of an EU-wide harmonised and comprehensive monitoring protocol
for reducing unhealthy food marketing to children.
Task Leader: DoH and THL, Participating partners: ICH, SCIENSANO, BMASGK, SPF, IPHS, CDPC,
MCA, PHI-FBH, PHI-RS, MOH-FR, NIPH, NIJZ, CHDR, MoH CY, NCPHA, CIPH, THL, DGS
Collaborating partners: WHO, OECD
Task 6.4.1. Review existing protocols to monitor unhealthy food marketing to children. This
task will review existing protocols to monitor the marketing of unhealthy food to children.
These include the Nordic monitoring protocol (Monitoring Food Marketing to Children – a
joint Nordic monitoring protocol for marketing of foods and beverages high in fat, salt and
sugar (HFSS) towards children and young people); the INFORMAS approach; and the WHO
CLICK Monitoring framework – Monitoring and Restricting Digital Marketing of Unhealthy
Products to Children and Adolescents.
Task 6.4.2 Protocols and identification of sources of data for each participating MS will be
explored and reported. The JRC food database will support the monitoring protocol for
reducing unhealthy food marketing to children by providing the data on food restricted for
marketing.
Task 6.4.3. Develop a proposal for an EU wide optimal protocol drawing on features of the
above-mentioned protocols with recommendations for the EU level and national
implementation. The main objective of this task is to develop a comprehensive approach to
monitor marketing of unhealthy food to children. This comprehensive approach will take into
account the different channels that are used for marketing activities and will be based on the
existing protocols in this field, as described in 6.4.1.
The EU harmonised monitoring protocol for unhealthy food marketing to children and
adolescents will be tested in the participating MSs. The leaders of this task, as well as, some
of the participating partners already have experience with these monitoring tools. A pilot
studies to test the CLICK tool are planned within the scope of WHO activities in Slovenia,
Finland and Portugal and the learnings will be shared with other MSs
Task 6.4.4 Knowledge capacity building among MS, to implement the monitoring protocol. A
Workshop will be organized to provide assistance to participating EU MS in the
implementation of the EU harmonised monitoring protocol for reducing unhealthy food
Date: 09/07/2020 53 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
marketing to children. This workshop will be led by the Nordic colleagues who developed the
Nordic monitoring protocol and will have the support of the WHO.
An EU WHO recognised subcontractor will work on tasks 6.4 and 6.5 and will support the
development and implementation of the monitoring protocols and support their
implementation in the broader EU context. Traditional media as well as digital media will be
addressed and media literacy of children evaluated where possible. The subcontractor will
support the development of the codes of practice in the interested MS. The subcontractor will
be subcontracted by one of the Irish Affiliated Entities.
Task 6.5 Guidance for regulatory and voluntary codes of practice.
Task Leader: DoH, DGS, Participating partners: ICH, SCIENSANO, BMASGK, SPF, IPHS, MCA,
PHI-FBH, PHI-RS, MOH-FR, CHDR, FCNAUP, MoH CY, MoSA, NIHD, THL, LR SAM
Collaborating partner: JRC
Task 6.5.1. Develop guidance for codes of practice on reducing unhealthy food marketing to
children. Regulatory codes from Ireland, Slovenia and Portugal on broadcast media will be
reviewed and used as guidance for participating MSs. The JRC toolkit will be included as
Technical guidance in form of a checklist of the main aspects to be covered in codes of practice
and an inventory of specific actions will be developed. The guidance will use the WHO NPM
to identify unhealthy foods that should not be advertised to children.
Task 6.5.2. Member States assistance for the implementation of codes of practice for non-
broadcast media and advertising of food and non-alcoholic beverages, including sponsorship
and retail product placement and other practices. A workshop led by Ireland who has
developed Codes on these will be organized to help participating MSs develop and implement
codes of practice to reduce unhealthy food marketing to children. The goal will be to have
participating MSs integrate relevant best practises into their national policies to reduce
marketing of unhealthy foods to children. A guidance document that can be used for the food
industry EU-wide will be prepared, together with an outline on governance and monitoring.
A document to encourage food companies and partner organisations to sign up to the Codes
will be developed and a register of signatories will be maintained and published by the
national monitoring bodies.
Task 6.6 Adaptation of the monitoring tools to address health inequalities
Task Leader: DGS; Participating partners: ICH, SCIENSANO, IPHS, NIPH, FCNAUP, NIJZ, MoH
CY, CIPH, THL
Collaborating partner: WHO
Task 6.6.1 Review of the health impact assessment of interventions to reduce unhealthy food
marketing to children, describing the effectiveness of interventions and approaches
differentiated by socio-economic variables. Portugal will lead on reviewing a health impact
assessment to inform and validate such adaptations of interventions to reduce marketing of
unhealthy food to children. A review of the literature will be conducted on the impact and
efficiency of current policies and actions with a focus on health inequalities. Given the lack of
evidence available on the effectiveness of interventions to tackle social inequalities, as shown
by the EU Health Equity Pilot Project, interviews with experts will be performed.
Task 6.6.2 Adaptation of the monitoring tools to address health inequalities will be reviewed.
The main goal will be to help ensure that implementing these tools will not increase the health
gap between advantaged and disadvantaged communities. This task will use experiences
from previous Joint Actions, MS experiences and EU projects in this field (JAHEE JA and EU
Health Equity Pilot Project (HEPP)). Systematic reviews of interventions to promote healthy
Date: 09/07/2020 54 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
eating to identify whether impacts differ by socioeconomic position will be examined. A
report on building social movements to address health inequalities in the area of reducing the
marketing of unhealthy food to children will be produced.
Task 6.7 EU harmonised Framework for Action on reducing unhealthy food marketing to
children
The successfully identified protocols for the implementation of effective policies to reduce
unhealthy food marketing to children will be consolidated in an EU Framework for action that
intend to be transferred across EU MS through the EU High Level Group on Nutrition and
Physical Activity. This Framework for Action will provide guidance for policy implementation
measures across the EU MS and will allow for regular updating through the EU HLG following
the end of this Joint Action facilitating ongoing sustainability.
Deliverables linked to this WP
D6.1 An EU harmonised approach using the WHO nutrient profile model for the identification
of foods not permitted for marketing to children (M9)
D6.2 Technical Guidance for codes of practice (M18)
D6.3 Report on pilot EU-wide harmonised and comprehensive monitoring protocol for
unhealthy food marketing to children, with a particular focus on digital marketing (M32)
D6.4 A harmonised EU Framework for Action on reducing unhealthy food marketing to
children, within the scope of HLG-N&PA (M36)
Milestones to be reached by this WP
M6.1 Establishment of the EU Expert Group and national intersectoral working group (M6)
M6.2 A workshop on how to use, adapt and implement the EU harmonised nutrient profile
model organised (M9)
M6.3 Regulation and legislation mapping report (M12)
M6.4 A workshop on how to implement codes of practice to reduce unhealthy food marketing
to children organised (M18)
M6.5 A workshop to implement the EU protocol to monitor food marketing to children
organised (M20)
Date: 09/07/2020 55 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
WP No. 7
Public procurement of food in public institutions –a pilot EU
WP Title
approach
Starting month 1 Ending month 36
Leading Applicant NIJZ
Applicants
1 2 2.2 4 4.1 4.2 5 8.1
No.
Applicants PHI- CPH-
NIJZ BMASGK GOeG MCA PHI-RS NCPHA
Acronym FBH MUN
Person
67,25 10 17,5 6 12 12 6 30
Months
Applicants
10 13 14.1 19 21
No.
Applicants
THL ICH NIPN MFH SUM
Acronym
Person
30 24,5 30 12 14
Months
Objectives
The overall objective of WP 7 is to contribute to the higher quality of menus, by assuring
transparent quality of the procured foods, in the (selected) public institutions in the
interested MS, and in the long-term, at the national/regional levels and at the EU level. WP7
activities contribute to the Best-ReMaP long-term overall objective to improve food choices
for children, thus adding to increased healthy life years at the MS and EU level.
Specific objectives of the WP 7 are as following:
To support the establishment of the intersectoral working group for the public procurement
of foods in public institutions, in the participating MS,
To increase the understanding, knowledge and skills regarding public procurement of
food/food products in selected public institutions,
To enable more choice of quality food stuffs for balanced menus in selected public
institutions, from at least one type of public institution (types of public institutions:
kindergartens, schools, retirement homes, hospitals), by piloting the Catalogue of foods in
the public procurement procedure,
To recommend further institutionalised implementation of the public procurement
procedures for foods, based on quality standards, in EU MS.
Description of work
Task 7.1 EU AND NATIONAL LEGISLATIVE FRAME AND INTERSECTORAL COOPERATION
Task Leader: NIJZ, Participating partners: BMASGK, GOeG, MCA, PHI-FBH, PHI-RS, NCPHA,
CPH-MUN, THL, ICH, SU, MFH, SUM
Task 7.1.1 Overview/applicative situation analyses of the existing EU and national legislation
will be prepared, related to public procurements of foods and recommendations for possible
improvements to achieve higher quality menu in public institutions, based on the Maltese
Presidency, JRC report and good practices in the involved MS. Each MS checks its own part
of the legislation, linked to the public procurement and identifies the need for legislative
amendments, based on the outcomes of the national workshops on procurement (task
7.1.3). When all the countries perform an overview and about the information regarding
Date: 09/07/2020 56 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
individual situations in the MS has been compiled, then this data could be grouped into
classifications around procurement and differing school provision/policy contexts.
7.1.2 Relevant sectors and stakeholders for the WP activities, linked with WP2 and WP4, will
be identified and the key motivating drivers/benefits for other sectors to participate will be
defined. An EU Expert Group will be established which will support a sub group of the EU
HLG on Nutrition and Physical Activity on public food procurements. Expert group will be
composed of the key EU and WHO health experts and other sectoral experts in the field of
public food procurements in public settings, linked with WP4. Other sectors will include DG
AGRI, DG Internal Market, Industry, Entrepreneurship and SMEs and possible others.
The national/regional inter-sectoral public procurements working group (WG) will be
defined and established in each of the participating MSs, with at least one meeting per year
(minimum three overall) and one national workshop per participating MS. The WG will
prepare (1) an indicative overview of the extent of the public procurements, in the national
currency, for all kinds of public institutions at the national/regional level; (2) an overview of
the transposed EU legislation on public procurements and green procurements in the
national context (3) an exploratory position on the possible introduction of the exemption
in the national/regional legislative public procurements context, all three points based on
the template prepared with the support of the experiences of a selected WP 7 subcontractor
in the field.
One of the major tasks of the inter-sectoral group will be the identification and definition of
the institutionalized sustainable approach – identification of the national/regional/local
focal point for the public procurements in public settings, responsible for the processes and
procedures and sustainability of the Catalogue of foods, with definition of the intersectoral
governance and competences, based on the good practice examples.
7.1.3 Organization of a national meeting/workshop on procurement, to define the state of
art and plan future steps/define the process. The workshop will address the following topics:
(1) presentation of the EU legislation in food procurements and green procurements, the
Maltese Presidency outcomes and JRC report, the Slovene legislative solutions in the EU
legislative context;
(2) presentation of the state of the art in visited Member States, including non-legal
practices; MS status report;
(3) initial presentation of the good practice from Slovenia, other best practices (BPs);
(4) identification of the similarities and differences among different national contexts,
relevant for the visited MS;
Preparation of the activity plans for action for the individual MS will be based on the
workshop outcomes and will be supported by a selected WP 7 subcontractor in the field.
7.1.4 National/regional/local focal points (FP) at the national institution(s) will be identified,
for the institutionalized coordination and implementation of the public food procuring
activities, linked to the work of WP4. The EU added value will be exploring the possibility of
the national/regional focal points for each participating MS. In year two, the questionnaire
to identify national focal points and to initiate the network will be composed and forwarded
to participating MSs. In case of COVID-19 situation, national/regional/local focal points will
be identified through Go to meeting application (webinar).
Task 7.2 PARTICIPATING INSTITUTIONS AND KNOWLEDGE BUILDING
Task Leader: NIJZ, Participating partners: BMASGK, GOeG, MCA, PHI-FBH, PHI-RS, NCPHA,
CPH-MUN, THL, ICH, SU, MFH
Task 7.2.1 Among all the types of public institutions that procure food at the
national/regional levels in the participating MS (such as kindergartens, schools, retirement
homes, hospitals), one or more type(s) of public institutions will be selected for participation
Date: 09/07/2020 57 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
in the action, and within the selected institution type(s), individual institutions (at least five)
will be selected for the implementation of the action.
Task 7.2.2 Knowledge building, knowledge sharing and knowledge transfer in EU MS
regarding food procurements will be provided, developed and implemented by support of
a selected WP 7 subcontractor in the field.
Knowledge transfer training(s) workshops (WS) in Slovenia and possibly elsewhere would
consist of the following topics:
- legislative context,
- situation analyses and needs assessment in the specified national /regional public
institutions;
- Catalogue of foods and its use in public procurements,
- Composition of the food public template procurement tender.
Three-days training sessions will be organized in year 2, including training of at least two
experts for the categorization and implementation of the categorization of food products,
using the piloted tool (Slovene and other adapted tools). An intensive three full days training
is foreseen for all participating countries, including approximately 10 participants per
training. Training materials will be prepared, with the inputs from the field, provided by a
selected subcontractor: (1) development of the training materials based on good practices
experiences; (2) testing of the training materials and tools at the trainings; (3) finalization of
the training materials, with the defined training protocol end evaluation templates.
Task 7.3 PILOT PROCUREMENT TOOL AND JOINT PUBLIC TENDER
Task Leader: NIJZ, Participating partners: BMASGK, GoeG, MCA, PHI-FBH, PHI-RS, NCPHA,
CPH-MUN, THL, ICH, SU, MFH
Task 7.3.1 Overview of the available tools in the participating MS will be prepared, with
recommendations for development of the joint pilot English-language Catalogue for
selected food groups, with possible adaptation of the available tools, including the Slovene
»Catalogue of foods«.
Task 7.3.2 The national/regional/local pilot study will be developed and implemented,
based on the task 7.3.1. outcomes. A Pilot English-language Catalogue of food products, for
selected food groups (minimum one selected food group, harmonized in the participating
MS), will be designed jointly with a selected subcontractor, bringing in practical experiences
from the field work:
(1) food groups for the implementation of the pilot study will be selected, harmonized
for all the participating countries (1st priority – milk and milk products; 2nd
priority – bread and bakery products; 3rd priority – meat and meat products);
(2) national or regional market analysis of the harmonized selected food groups will
be conducted, to compose at least one national/regional list(s) of food products,
available on the market, relevant for public settings;
nationally specific and approved quality criteria are to be added to the food
products on the list (e.g. use of the green procurement regulation as supportive
element to define the procuring distance; labels, allergens, nutritional value, place
of origin, certificates, ...)
to simplify and harmonize the process, Slovenia will provide computerized pilot
(prototype) list(s) of relevant food products, to be translated in the national
languages and upgraded; national teams will check the list(s) and supplement them
with the nationally available food products;
(3) national teams will create the national Pilot Catalogues of food products (selected
list) and check the produced catalogue with the national food providers
(4) testing and piloting of the Catalogue of the selected foods, while building the
ownership of the MS (exploring the national/regional specific situation and
searching for the specific approaches and solutions)
Date: 09/07/2020 58 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(5) development of the procurement testing tender and templates, based on the
Slovene and other best practices and JRC work;
Task 7.3.3 Joint execution of public tender, with the implementation practically organized
by the selected subcontractor, with harmonized timing among all the participating MS - one
testing public tender executed, for up to three priority food groups; comparative testing of
the Catalogue of foods in participating MS – to demonstrate the functioning of the Catalogue
of foods within different MS and highlight the possible linkages.
The Catalogue of foods contains database with generic or more specific data for different
food groups. The generic database includes all previously known food titles in menus (such
as full-fat cottage cheese), subcategories and product types, which will be then later in the
process replaced by the products of choice, entering the menus. When the public tender is
composed,
Task 7.3.4 Development of the approach towards the EU market analysis with the aim to
compose the joint EU list of food products, where relevant, based on the participating MS
lists (as mentioned above), with support of a potential procurement officers network. Joint
EU list of food products will be embedded in JRC food database. This will enable transparent
overview of food products and their traceability.
Austria will subcontract external expertise in order to participate in Tasks 7.2 and 7.3, to
develop and implement joint public tender.
Task 7.4 PUBLIC FOOD PROCUREMENTS EVALUATION CRITERIA
Task Leader: NIJZ, Participating partners: BMASGK, GoeG, MCA, PHI-FBH, PHI-RS, NCPHA,
CPH-MUN, THL, ICH, SU
Development of the evaluation criteria, based on the practical experiences and good
practices from the field - with the inputs from the MS, based on the national specificities:
- MS to explore the existing criteria at the national level and develop the national
criteria, for the executed public tender;
- comparison of the different criteria in the MS;
- draft recommendation for the harmonization of the criteria at the EU level, with
complete digitalization and transparency, for further steps and potential new
funding mechanisms to support implementation of JA outcomes.
Task 7.5 CASE STUDIES
Task Leader: NIJZ, Participating partners: BMASGK, GoeG, MCA, PHI-FBH, PHI-RS, CPH-MUN,
THL, ICH, SU
Task 7.5.1. Comparison analyses -case studies (M30 - M36):
- template to describe the process and experiences from the individual MS;
- comparative analyses;
- draft recommendation for the harmonized approach at the EU level, for future steps
and projects to be submitted for funding, all in consultation with a selected
subcontractor to develop practical innovative solutions.
Task 7.6 EU harmonised Framework for Action on food procurements in public settings
The successfully developed and implemented pilot protocol for the implementation of
public procurement of foods in public settings will be consolidated in a EU Framework for
action for public procurements of foods in public settings that intend to be transferred
across EU MS through the EU High Level Group on Nutrition and Physical Activity. This
Framework for Action will provide guidance for policy implementation measures across the
EU MS and will allow for regular updating through the EU HLG following the end of this Joint
Action facilitating ongoing sustainability.
Date: 09/07/2020 59 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Task 7.7 RECOMMENDATIONS FOR SUSTAINABLE POLICY DEVELOPMENT
Task Leader: NIJZ and ISS, Participating partners: BMASGK, GoeG, MCA, PHI-FBH, PHI-RS,
CPH-MUN, THL, ICH, SU
Task 7.6.1 A roundtable will be organized to present the employed good practices and the
pilot approach and provide the feedback from the MS, possibly at ministerial level, and the
European Commission.
Task 7.6.2 Recommendations for further developments of the approach will be provided in
line with WP 4, to support the effective institutionalized implementation of the results and
the MS and EU level use. This may be done with a view of potentially creating a network of
public procurement officers.
Sustainability plan for HLG Framework for food procurements work plan will be prepared.
Deliverables linked to this WP
D7.1 Overview/applicative situation analyses of the existing EU and national legislation (M7)
D7.2 Knowledge transfer training(s) (M22)
D7.3 Pilot Catalogue of foods (M32)
D7.4 EU harmonised Framework for Action (M36)
Milestones to be reached by this WP
M7.1 Selection of the public institutions type(s) for participation (M15)
M7.2 Inter-sectoral public procurements working group workshop(s) (M16)
M7.3 Pilot protocol development (M26)
M7.4 Execution of a joint public tender (M30)
M7.5 Procurement evaluation criteria (M34)
Date: 09/07/2020 60 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
7.3 Timetable and Milestones
A detailed GANTT chart will be produced by WP 1 to track all milestones and deliverables set out
in the GA, as well as track additional milestones and deliverables internally agreed upon
between the WP Leaders and WP 1. This GANTT chart will be produced by M 2 and will form an
integral part of the Best-ReMaP Project Policy. A summary of the milestones and deliverables as
set out in the GA are visualised in the table below.
WP 1 WP 2 WP 3 WP 4 WP 5 WP 6 WP 7
M1 M 1.1 M 3.1 M 5.1
M2
M3 MD 2.1/ MD 2.2
M4 M 1.2 D 2.3 M 3.2
M5 D 3.1
M6 M 1.3 D 4.1 M 6.1
M7 D 7.1/ M 7.1
M8
M9 D 5.1 / M 5.2 D 6.1/ M 6.2
M 10 M 5.3
M 11
M 12 D 1.1 M 4.1 M 6.3
M 13
M 14 M 1.4 M 5.4
M 15 M 7.2
M 16 M 7.3
M 17
M 18 M 4.2 D 6.2/ M 6.4
M 19
M 20 M 1.5 MD 2.4 MD 3.2 M 6.5
M 21
M 22 M 5.5 / M 5.6 D 7.2
M 23
M 24 D 1.2
M 25
M 26 M 7.4
M 27
M 28
M 29
M 30 D 5.2 M 7.5
M 31
M 32 D 6.3 D 7.3
M 33 D 2.3
M 34 M 4.3 M 7.6
M 35 M 2.1
M 36 D 1.3 D 2.5 MD 3.3 MD 4.2 D 5.3 D 6.4 D 7.4
M 1.6 MD 2.6 M 3.3 D 4.3
M 1.7 MD 2.7 M 4.4
M 2.2
LEGEND
NIJZ ISS SU TLH ANSES DoH and DSG
Date: 09/07/2020 61 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Estimated
Milestone Lead WP
Milestone name Date of
no. Partner Number
Delivery
M 1.1 Best-ReMaP Kick-off Meeting – SC, GA NIJZ WP1 M1
Finalised Best-ReMaP Project Policy and
M 1.2 NIJZ WP1 M4
Financial Policy work plans
Signature of Best-ReMaP consortium
M 1.3 NIJZ WP1 M6
agreement
M 1.4 Mid-term conference executed NIJZ WP1 M14
M 1.5 Interim Report NIJZ WP1 M20
M 1.6 Final conference executed NIJZ WP1 M36
M 1.7 Final Report NIJZ WP1 M36
M 2.1 6th Newsletter issued SU WP2 M35
Webinars to disseminate WP results
M 2.2 SU WP2 M36
completed
M 3.1 Selection of external evaluators THL WP3 M1
M 3.2 First meeting with the external evaluators THL WP3 M4
Completed outcome evaluation with
M 3.3 THL WP3 M36
external evaluators
At least 6 semi-structured interviews have
M 4.1 ISS WP4 M12
been carried out in relation to Task 4.1
At least 3 semi-structured interviews have
M 4.2 been implemented in relation to Task 4.1 ISS WP4 M18
M 4.3 JRC implements food database ISS WP4 M34
M 4.4 Policy dialogues completed ISS WP4 M36
Dissemination workshop on 1st snapshot
M 5.1 ANSES WP5 M1
results
M 5.2 List of the priority food groups ANSES WP5 M9
Launch of the first snapshot and guideline
M 5.3 ANSES WP5 M10
test
Launch of the batch 1 of the second
M 5.4 ANSES WP5 M14
snapshot
Launch of the batch 2 of the second
M 5.5 ANSES WP5 M22
snapshot
Preparatory trainings for data collection
M 5.6 ANSES WP5 M22
and encoding
Establishment of the EU Expert Group and
M 6.1 DoH, DGS WP6 M6
national intersectoral working group
A workshop on how to use, adapt and
M 6.2 implement the EU harmonised nutrient DoH, DGS WP6 M9
profile model organised
M 6.3 Regulation and legislation mapping report DoH, DGS WP6 M12
A workshop on how to implement codes
M 6.4 of practices to reduce unhealthy food DoH, DGS WP6 M18
marketing to children organised
Date: 09/07/2020 62 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
A workshop to implement the EU protocol
M 6.5 to monitor food marketing to children DoH, THL WP6 M20
organised
Applicative situation analyses with initial
recommendations for possible
M 7.1 NIJZ WP7 M7
improvements for food public
procurement procedures prepared
Selection of the public institutions type(s)
M 7.2 NIJZ WP7 M15
for participation
Inter-sectoral public procurements
M 7.3 NIJZ WP7 M16
working group workshop(s)
M 7.4 Pilot protocol development NIJZ WP7 M 26
M 7.5 Execution of a joint public tender NIJZ WP7 M30
M 7.6 Procurement evaluation criteria NIJZ WP7 M 34
Date: 09/07/2020 63 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
8 DELIVERABLES
Leadin Deliv
Dissem
Deliverable Deliverable WP g ery
Content Specification ination
No. Name No. Applic Mon
Level
ant th
Deliverables (D), Administrative Deliverables (ADs) & Mandatory Deliverables (MDs)
Meeting
Minuted discussions and
minutes of
D1.1 WP1 NIJZ conclusions of the policy PU M12
the PDMF
decision making forum
meetings
Meeting
Minuted discussions and
minutes of
D1.2 WP1 NIJZ conclusions of the policy PU M24
the PDMF
decision making forum
meetings
Meeting
Minuted discussions and
minutes of
D1.3 WP1 NIJZ conclusions of the policy PU M36
the PDMF
decision making forum
meetings
This is a publication with core
Introductory project information to
MD2.1 WP2 SU PU M3
leaflet promote the JA with easy-to-
understand details
This website will provide
project and WP level
information on all activities of PU
MD2.2 Website WP2 SU the project. It will also (and M3
feature a dedicated page for CO)
events and well as the
newsletters.
Strategy specifies the
dissemination aims and
objectives, detailed activity
planning, identification of the
Dissemination target groups, dissemination
D2.3 WP2 SU PU M4
strategy channels, the timing of the
dissemination actions and the
visibility of European Union
co- funding, as well as the
description of JA
Data analytics driven analysis
to answer the key
communications questions:
Mid-term
Who are the followers of the
MD2.4 report on WP2 SU PU M20
news/information presented
Dissemination
by the project? Which
content resonates with the
audience?
Two short promotional films,
out of which one will be
Promotional
specifically prepared for M
D2.5 movies WP2 SU PU
school-aged children. It will 36
completed
be animation based, 2-3
minutes long and it will
Date: 09/07/2020 64 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
address the elements of the
healthy diet.
This is a short, 4 pages
Layman version of the final report
MD2.6 version of the WP2 SU with infographic, written for PU M36
final report the wide public as a target
group.
Final report Data analytics driven analysis,
MD2.7 on WP2 SU making the final evaluation of PU M36
Dissemination the communication activities.
Evaluation Preparation and publication
D3.1 WP3 THL PU M5
strategy of the evaluation strategy
Report on the progress,
Mid-term
processes and outcomes, and
MD3.2 report on WP3 THL PU M20
recommendations for the
Evaluation
remaining work period.
The final evaluation report
Final
outlining the central
MD3.3 Evaluation WP3 THL PU M36
outcomes and conclusions
report
related to the objectives.
Summary of the conclusions
and recommendations of
Documents
relevant documents, websites
retrieved in
D4.1 WP4 ISS and scientific literature, PU M6
the desk
dealing with the factors
research
related to the sustainability
of a project.
Integration
and This report will include a
sustainability proposed plan describing
plan (Report which results will be further
on developed, consolidated and
MD4.2 WP4 ISS PU M36
sustainability integrated into policies and
and national plan and by which
integration in organization(s) it would be
national done.
policies)
Briefs summarizing the
Briefs of the results of the discussion with
D4.3 four policy WP4 ISS EU and MSs during the policy PU M36
dialogues dialogues and the
commitments by the MSs.
Development
This report will help countries
of the
to implement and maintain a
Guidelines for
reformulation monitoring
an European
system. The methodology will
harmonised
be explained with the
and
D5.1 WP5 ANSES standardised subcategories of PU M9
sustainable
products to apply for an
monitoring
adequate reformulation
system of the
monitoring. This document
processed
will be tested during the
food supply,
snapshot implementations.
consultation/
Date: 09/07/2020 65 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
temporary
report
Final guidelines will help
European countries to
implement and maintain a
Final reformulation monitoring
Guidelines for system with the
an European reformulation monitoring
harmonised methodology, the priority
and processed food groups to
D5.2 WP5 ANSES PU M30
sustainable monitor, the best sources of
monitoring data or best technologies to
system of the use for the data collection,
processed the conditions for a
food supply sustainable European
monitoring.
Report on
reformulation
monitoring:
monitoring
implementati This report will provide best
on, practices at the European
D5.3 reformulation WP5 ANSES level, in terms of PU M36
comparisons reformulations with theirs
and impacts of nutrient intakes
reformulation
impacts on
nutrient
intakes
An EU
harmonised
approach
using the
The nutrient profile model
WHO nutrient
will help EU MS to have a
profile model DoH,
D6.1 WP6 harmonized approach and it PU M9
for the DGS
will be tested in some
identification
participant MS.
of foods not
permitted for
marketing to
children
Technical These guidelines will help EU
guidance for DoH, MS in developing codes of
D6.2 WP6 PU M18
codes of DGS practices to control food
practice marketing to children
Report on The monitoring protocol for
Pilot EU–wide unhealthy food marketing to
harmonised children will be tested and
and DoH, piloted in several participant
D6.3 WP6 PU M32
comprehensiv DGS MS. This report will provide
e monitoring best-practices for all EU MS
protocol for on how to monitor unhealthy
unhealthy food marketing to children.
Date: 09/07/2020 66 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
food
marketing to
children, with
a particular
focus on
digital
marketing
A harmonised
EU
Framework
The EU harmonised
for Action on
Framework for Action on
reducing
reducing food marketing to
unhealthy DoH,
D6.4 WP6 children will help all EU MS to PU M36
food THL
implement a strategy to
marketing to
reduce food marketing to
children,
children
within the
scope of HLG-
N&PA
Overview/
applicative
This overview will bring the
situation
insights in national legislative
analyses of
D7.1 WP7 NIJZ frame and sectoral capacities, PU M7
the existing
including identified points of
EU and
possible improvements.
national
legislation
Training(s) will involve at
Knowledge least two experts for
D7.2 transfer WP7 NIJZ categorization of food PU M22
training(s) products and implementation
of the piloted tool
Pilot Catalogue(s) of food
Pilot
products (selected list) will be
D7.3 Catalogue of WP7 NIJZ PU M32
tested and piloted in one
foods
testing public tender
This Framework for Action will
EU identify key elements of the
harmonised comprehensive approach M
D7.4 WP7 NIJZ towards high quality public PU
Framework 36
for Action procurements of foods in
public settings.
Date: 09/07/2020 67 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
9 PROJECT MANAGEMENT
9.1 Methods
The Best-ReMaP JA will be led using traditional project management approaches supplemented
through extensive experience of coordinating other JAs and novel software solutions for project
management. We will manage the JA through an experienced operational team at NIJZ (Project
Management Team) dealing with day to day coordination of the JA, supplemented by a close
team of WP Leaders and Associated Partners, and finally Collaborating Partners and other key
stakeholders. Our overall aim will be to track progress of JA milestones and deliverables in real-
time, anticipating risks and providing mitigation measures, while closely monitoring financial
expenditure and tasks as set out formally in the Grant Agreement. We will additionally use our
extensive experience in having coordinated four other Joint Actions to implement additional
proven project management measures, such as the introduction of additional six-month
financial progress reports, workshops on financial reporting, regular bi-lateral web conferences
between WP 1 and other WPs, close contact with CHAFEA and other EC bodies for regular
updating, establishing early contacts with synergistic projects and JAs at EU level to boost added
value, etc.
Date: 09/07/2020 68 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
9.2 Governance, Roles, Responsibilities
The below diagram demonstrates the project management structure, which reflects the
governance structure of the Best-ReMaP JA and links between individual Work Packages,
management bodies and Collaborating Partners. A project management structure will be
established to manage the JA. The management will consist of several tiers, with interconnected
bodies acting horizontally to the foundational management structure of the PMT, SC and GA.
The central role of the WP4 is highlighted and links between the three core WPs 5 – 7 are
indicated:
9.3 Processes & Artefacts
Several management processes will run in parallel during the Best-ReMaP JA. The main focus
will be on risk management – we will closely monitor the risks through the close operational
coordination between WP 1 and 3, as well as with the JA Steering Committee of WP Leaders and
key stakeholders. Outstanding issues will be resolved during regular webinars, as well as face to
face meetings and daily e-mail correspondence. We will aim to foresee issues in advance in order
to avoid large scale problems (for example, financial reporting will be held every 6 months as an
internal report in order to closely monitor expenditure and compare deliverables vs. funds
used).
In order to avoid duplication of documents and key messages being scattered throughout
various email communications between the PMT and partners, WP 1 will produce several
comprehensive documents that will serve as reference manuals for partners in the JA. The key
project management documents we anticipate producing are:
- Project Policy – key reference manual for all Associated Partners outlining key concepts,
processes, management structure including project bodies, participants, meeting
structure and provisional schedule, inclusion of collaborating partners, reimbursement
schemes, visibility of EU co-funding, disclaimer texts, etc. In essence, the Project Policy
Date: 09/07/2020 69 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
will serve as a one-stop document for all partners, detailing all obligations and working
methods within the JA in a clear, easy to use format and serve as an operational guide
for all partners.
- Financial Policy – key financial manual for all Associated Partners outlining in detail all
rules regarding JA expenditure, with in-depth information on all cost categories, the
specific Best-ReMaP budget, eligible costs, formulae for calculation of costs, necessary
supporting documentation, financial reporting deadlines, internal reporting procedures,
instructions on how to use the 4pm financial management reporting platform. Similarly,
as above, the Financial Policy will serve as a one-stop document for all partners,
particularly financial officers, detailing all obligations and working methods within the
JA in a clear, easy to use format and serve as an operational guide for all staff working
on compiling the financial reports for the JA.
- Consortium Agreement – key legal document to be signed by all Associated Partners
outlining mutual roles, responsibilities and obligations of all parties to the Agreement,
building upon the stipulations of the Grant Agreement.
- Supplementary documents from WP 2 and 3 connected to project management
processes, such as the Dissemination Strategy and Evaluation Strategy.
9.4 Quality & Capacity of the Partnership
The Best-ReMaP JA consortium consists of 24 countries, 22 EU MSs and two accession countries
(Bosna and Herzegovina, Serbia). The consortium is (1) based on the HLG on nutrition member
states actions, expertise and experiences, (2) framed within the scope and objectives of the EU
Action Plan on Childhood, Obesity, (3) defined by the reformulation frameworks set by the HLG,
(4) recommended by the previous JANPA JA and (5) elaborated on the MS best practices in
nutrition results. The consortium members consist of ministries of health (8), national agencies
(5) or institutes of public health (14), prominent universities (3) or other institutions (2) in the
participating Member States. Partners also cover regional levels and one of the partners is
included due to the implementation needs at local level. The HLG on nutrition is the catalyst of
all the actions, linking partners, expertise and policy environments. Thus, the activities planned
in the Best-ReMaP JA will be carried out by a high-quality, experienced and varied consortium
of partners from across Europe.
The majority of the WP Leader institutions already have experience in past Joint Actions (France,
Ireland and Finland being the leads in JANPA, Hungary being the lead in JANPA and CHRODIS+,
Italy leading JAHEE, Slovenia coordinating three JAs on cancer and one on patient registries and
taking WP leads in several other JAs). They will build upon their previous experiences of partner
and task management, making for a very efficient team of WP Leaders from the very onset of
the JA. The same applies to the Project Management Team, a group of individuals at NIJZ who
have extensive experience in coordination of Joint Actions, as well as experience in intercultural
project management and management of stakeholder expectation and involvement.
The focus of the JA will be on implementation and sustainability of the selected good practices:
(1) France is leading its good practice on reformulation, (2) Ireland and Portugal are leading their
good practice on restricting marketing to children and (3) Slovenia is leading its good practice
on public procurements of food.
Date: 09/07/2020 70 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
9.5 Capacity of the staff to carry out the project
SLOVENIA: The National Institute of Public Health (NIJZ) (Nacionalni inštitut za javno zdravje)
is the central Slovene institution for public health practice, research and education. Its academic
staff work on various tasks covering the areas of epidemiology of communicable and non-
communicable diseases, health promotion, health protection, health system research and
national coordination of preventive programmes in primary health care. The main function of
NIJZ is to provide research in the field of health, protect and increase the level of health of the
population by raising the awareness of population and carrying out other preventive measures.
NIJZ is organised as one central unit with nine regional offices and employs over 500 staff
members. NIJZ has successfully coordinated and participated in various international projects.
NIJZ has also taken on the role of coordinator in four prominent EU-funded Joint Actions: EPAAC
– European Partnership for Action Against Cancer, PARENT – Cross-border Patients’ Registries
Initiative, CANCON – Development of a European Guide on Quality Improvement in
Comprehensive Cancer Control and the still running iPAAC – Roadmap on Implementation and
Sustainability of Cancer Control Actions. NIJZ has an experienced and dedicated Project
Management department that will take on the operational aspects of managing the JA. A fully
operational and experienced Project Management Team will be in place from the beginning of
the JA, covering financial management, administrative support, project management, legal
support, communications support and scientific coordination. Key staff: Mojca Gabrijelčič
Blenkuš- senior adviser, medical doctor, specialist of public health, PhD in social sciences;
involved in health in all policies approaches at different levels, social determinants of health and
health equity; special interest in health promotion in nutrition, physical activity, obesity. Urška
Blaznik - senior researcher at NIJZ, active in the field of reformulation for the last ten years,
member of the Working group for the implementation of the National action plan for salt
reduction, active member of the national research program group Nutrition and Public Health.
Tina Lipušček – head of project management and research at NIJZ, acted as project manager of
the EPAAC and CANCON JAs, project manager of iPAAC JA, 10 years’ experience in EU project
management. Karmen Hribar – will act as deputy Project Manager, two years’ experience as
iPAAC secretariat and project manager. Tanja Mežnar – four years of experience in financial
management of EU projects, experience with financial auditing of EU projects. Natalija Rozman
- Master’s Degree in Sanitary engineering, previous experience with nutrition policy projects.
Ingrid Sotlar- Bachelor’s Degree in Sanitary engineering, previous experience with nutrition
policy projects. Petra Kravos - Bachelor's Degree in Dietetics, previous experience with NIJZ
nutrition policy tasks. Monika Robnik - Master’s Degree in Sanitary engineering, previous
experience with nutrition policy projects.
AUSTRIA: The Federal Ministry of Labour, Social Affairs, Health and Consumer Protection
(BMASGK) is the competent authority in Austria. It is among other things responsible for the
general healthcare system as well as the field of public health, food, medical and veterinary law
(division IX). Unit IX/A/8 is responsible for mother, child, gender health and nutrition. Key staff:
Priv. Doz. Mag. Dr.in Karin SCHINDLER, PhD in Nutrition Sciences, Head of Unit IX/A/8, PhD in
management of HIV/AIDS patients, habilitation in metabolism, senior researcher with 20 years
of experience in treatment, research, policy development and implementation in the field of
HIV/AIDS, obesity, diabetes, age and disease related malnutrition. Mag. Judith BENEDICS,
Nutrition Scientist, Technical Officer, Researcher. 10 years of experience in the field of nutrition
of different age groups and 5 years of experience in public administration and project
management. Adelheid Weber, MSc, Bakk. In Nutrition Sciencies, Technical Officer, Researcher,
Master of Science with specialization in Public Health and Nutrition, 4 years of experience in
public administration and project management. Affiliated entity: The Austrian Agency for
Health and Food Safety (AGES) supports the management of the federal ministries and the two
federal agencies subordinated to it in questions relating to public health, animal health, food
safety, medical and drug safety, food security and consumer protection along the food chain by
providing professional and independent scientific expertise. Key staff: Dr. Alexandra Wolf-
Spitzer, PhD - head of Department for Nutrition and Prevention (AGES), senior expert in public
health nutrition, 7 years of experience in research, implementation and evaluation of public
Date: 09/07/2020 71 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
health nutrition programs. Dr. Bettina Meidlinger, PhD in Public Health, researcher in nutrition,
14 years of experience. Christian Luipersbeck, BSc, junior researcher in nutrition and web
developer for the national monitoring system "Food in the Spotlight", 2 years of experience. The
Austrian National Public Health Institute (GOeG) is a public non- profit limited liability company
fully owned by the Federal State of Austria with strong competencies in health care planning,
health economics, public health and health promotion. One task ist the professional support in
reaching the Austrian Health Targets where nutrition is also tackled. Gabriele Antony, BA MA –
sociologist, researcher at the Department “Health & Society”. She has 7 years’ experiences in
research and implementation public health strategies and health- in-all-policies processes to
promote health for all people in Austria, 3 years’ experience in nutrition-related processes.
Carina Marbler, BA MA – Health manager in tourism, researcher at the Department “Health &
Society”. She has 4 years’ experience in research and implementation public health strategies
and health- in-all-policies processes, 3 years’ experience in nutrition-related processes. Mag.
Rita Kichler Nutrition Scientist, Health Promotion Professional at the Division „Austrian Health
Promotion Foundation “. She is expert for nutrition in the National Committee of Nutrition (NEK)
and in other specific committees of nutrition and has 22years of experience regarding project
management and project counselling in the field of health promotion and nutrition.
BELGIUM: SCIENSANO is a federal research institute and a scientific reference in the field of
public health in Belgium. The Institute supports health policy and policy-making through
research, monitoring, analyses and expert advice. The Institute builds on more than 100 years
of scientific expertise of the former Veterinary and Agrochemical Research Centre (CODA-
CERVA) and the ex-Scientific Institute of Public Health (WIV-ISP). Key staff: Dr Stefanie
Vandevijvere is a bioscience engineer with a degree of Doctor in Public Health, senior Scientist
in Public Health Nutrition, Food and Nutrition Policy and Nutritional Epidemiology.
BOSNIA AND HERZEGOVINA: The Ministry of Civil Affairs of Bosnia and Herzegovina (MCA) - is
state-level institution responsible for carrying out tasks and discharging duties, which are within
the competence of Bosnia and Herzegovina and relate to defining basic principles, coordinating
activities and harmonizing plans of the Entity authorities and defining a strategy at the
international level in the field of health care. Key Staff: Draženka Malićbegović, Project
Coordinator, university degree in medicine and a specialization in paediatrics. 25 years + of
professional experience in managing and coordination of the various international healthcare
Projects. Ivana Trifković, Senior Researcher, university degree in economics and extensive
experience in tendering and public procurement procedures. Zorica Rulj, Researcher, university
degree in journalism, public relations specialist with 25 years + experience in organizing media
events. Vedrana Janjetović-Čojo, Researcher, university degree in economics, responsible for
following the implementation of the Projects in health sector in BiH. Affiliated entities: Institute
of Public Health of Federation of Bosnia and Herzegovina (PHI- FBH) - is a state owned public
health institution based in Sarajevo, Bosnia and Herzegovina. Under the framework defined by
the Law on Health Care of Federation of Bosnia and Herzegovina, through its Service for
Epidemiology, Service for the Promotion of Health and Education, Service for Hygiene Health
Ecology and Nutrition, Service for Social Medicine and Organization, Service for Health Statistics,
Centre for Radiation Protection and Centre for Health Management, Institute performs wide
range of public health as well as educational, promotional, scientific and research activities. Key
staff: Aida Filipović Hadžiomeragić, Senior Researcher, medical doctor, specialist in hygiene
holding PHD in nutrition and is Federal Ministry of Health nutrition counterpart in collaboration
with the WHO, experience in nutrition and public health research related to school children and
in projects coordination, researcher (TBD) - to support activities under WP 5 and WP7. Public
Health Institute of Republic of Srpska (PHI-RS) - is a public health institution, registered in
accordance with the Republic of Srpska’s Law on Health Care. The Law provides a legal mandate
for the Institute to provide services related to epidemiology, hygiene, ecology, microbiology and
social medicine. The Institute works under direct jurisdiction of the Ministry of Health and Social
Welfare. Key staff: Dragana Stojisavljević, Senior Researcher, medical doctor, specialist in
hygiene, assistant professor on Medical Faculty University in Banja Luka, Republic of Srpska
Ministry of Health nutrition counterpart in collaboration with the WHO, experience in nutrition
Date: 09/07/2020 72 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
and public health research related to school children and in coordination of WHO and UN funded
projects (UNICEF, UNDP), researcher (TBD) - to support activities under WP 5 and WP7.
BULGARIA: The National Centre of Public Health and Analyses (NCPHA) is a scientific, expert
and consultative body within the Ministry of Health, Bulgaria. NCPHA is a structure within the
national healthcare system and carries out activities for protecting public health, promoting
health and preventing diseases, providing information for healthcare management. Key staff: 2
senior researchers (Medical doctors -1 Professor- Vesselka Duleva and 1 Associate professor
Lalka Rangelova in Nutrition and dietetics) with years of experience in development and
implementation of national food and nutrition policy; 5 researchers with academic degrees
(medical doctor – Stanimira Stavreva, biochemist – Evelina Aceva, social pedagogies – Zornica
Duneva, statisticians – Daniela Bojilova, engineer – Ivelina Dicheva) and 1 junior researcher
(chemists – Tania Petrova) with long experience oriented to applying science in the field of
nutrition and public health.
CROATIA: Croatian Institute of Public Health (CIPH) is a central public health institute in the
Republic of Croatia and it deals with public health, health promotion and education, disease
prevention, microbiology, environmental health, school medicine, mental health care and
addiction prevention. Its main tasks are to plan, promote and implement measures for the
enhancement of population health and reduction of health problems. Key staff: Maja Lang
Morović, master of education with a background in early childhood development and special
education, 12 years of professional experience in early childhood development, child health
promotion and childhood obesity prevention. Lea Pollak, master in Nutrition with a PhD in the
same field, 17 years of professional experience in food supplements and biologically active
substances, national expert/member in the European Working Group for Novel Food of
European Commission and scientific expert in the EFSA for the Novel Food area. Andrea Adanić
Pajić, master of nutrition and expert for Scientific opinion of novel food for Initial Risk
Assessment, involved in the analyses, consulting, development, revision of labels and
legislations related to food supplements, PARNUT/FSG, nutrition, and health claims, fortified
foods, and novel foods. Bojana Raičković, master of psychology and a project manager, 3 years’
experience in project management, project assessment, planning, monitoring and evaluation,
financial management, budgeting and reporting to international partners.
CYPRUS: Ministry of Health Cyprus (MoH CY) (Υπουργείο Υγείας της Κύπρου) is the main
responsible institution for the prevention and protection of public health in Cyprus. Its mission
is the continuous improvement of health of the Cyprus population, through disease prevention
and the provision of high level health care to the population of Cyprus. Key staff: Eliza Markidou,
MSc BSc RDel, Nutrition Coordinator MOH, she will be supported by 1 dietitian as part time and
will proceed in getting a junior researcher of the project.
DENMARK: The Danish Veterinary and Food Administration (DVFA), which is part of the
Ministry of Environment and Food of Denmark, is an expert authority with responsibility for
promoting healthy nutrition in the Danish population. The mission of DVFA is to promote safety,
health and quality from farm to table. DVFA have the task of disseminating scientifically based
knowledge to promote healthy eating habits and prevent lifestyle diseases and premature death
caused by unhealthy eating habits. Key staff: 1 special adviser, experience with public and policy
administration and process consultancy and experience from the European level. 1 academic
officer, experience with public and policy administration and reformulation and monitoring. 1
financial manager, experience with budgeting in large scale projects. Affiliated Entity:
Copenhagen Municipality (CPH-MUN) is responsible for the wellbeing of the citizens of
Copenhagen. Key staff: Betina Bergmann Madsen, senior food procurement officer, expert in
writing public procurement, experience in public and policy administration and process
consultancy and experience from the European level in many different project, expert helping
writing the newly published GPP criteria on Food and Catering, and elected to be a part of GD
GROWs Public Procurement stakeholder group. 1 academic officer, (TBD) experience with
developing criteria for tenders, - specifically writing the specifications on quality and
Date: 09/07/2020 73 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
sustainability for public procurement. Carsten Friis Toft, financial manager, experience with
budgeting in large scale projects.
ESTONIA: Ministry of Social Affairs of Estonia (MoSA) is responsible for developing strategies
and coordinates the implementation of policies in the field of health. Its competencies include
the leading role in coordination of public health policies, prevention of no communicable
diseases and development of respective strategies. Key staff: Sille Pihlak (RN) – Chief Specialist
of the Public Health Department of the MoSA of Estonia. Main competences include
coordination of policies and strategies in the field of nutrition and physical activity, 4 years of
experience in the field of nutrition. Affiliated entity: The National Institute for Health
Development (NIHD) is a government established research and development body collecting,
connecting and providing reliable national information from a multitude of sources, related to
the health of the Estonian population. Main areas of activity are evaluation and assessment of
population health and health determinants, health promotion, organization of public health
services and social services, consultations on and influence of health policy. Key staff: Haidi
Kanamäe (MsC) – Head of the Nutrition and Exercise Unit of Centre for Health Risks Prevention
of NIHD, 2 years’ experience in the field of nutrition, 17 years’ experience in the field of food
safety. Analyst (tbd) of the Department of Nutrition Research of NIHD, involved in surveys
related to nutrition and health behaviour related to development of Estonian diet database.
Person (tbd) will be act as project coordinator.
FINLAND: The Finnish Institute for Health and Welfare (THL) studies, monitors, and develops
measures to promote the well-being and health of the population in Finland. THL is an
independent expert agency working under the Ministry of Social Affairs and Health. THL gathers
and produces information based on research and register data and provides expertise and
solutions to support decision-making. THL has participated in number of Joint Actions in the past
(e.g. CHRODIS, CHRODIS+, JANPA). Key staff: Research Professor Markku Peltonen, PhD, 20
years + of experience in health promotion and public health with main interest related to
lifestyle factors in non-communicable diseases, experience in evaluation of large scale research
and implementation projects. Adjunct professor Jaana Lindström, PhD, research manager and
team leader in THL, over 25 years of experience in projects related to chronic disease prevention.
Adjunct professor Liisa Valsta, PhD, research manager and team leader in THL, 30 years of
research experience in the field of dietary interventions, public health nutrition and dietary
assessment methods, expert in food composition data. Dr. Susanna Raulio, PhD, years of
experience in public health nutrition, in nutrition surveys and nutritional environments at
workplaces, schools, expertise in cooperation with food catering services and in nutrition policy.
Senior researcher Heli Kuusipalo, MSc (Nutrition), MA, policy expert specialized in early
nutrition (maternal and child health) and a member of several working groups that give
guidelines, recommendations and implementation actions, over 12-year experience in
international projects and has participated JANPA as a team leader. Development manager Päivi
Mäki, MSc (Health sciences), coordinator of a Nordic Childhood Obesity Prevention Network
(Promokids) and a primary investigator of the WHO’s COSI in Finland research, participates also
in a EU Horizon Science and Technology in childhood Obesity Policy (STOP) project.
FRANCE: French Agency for Food, Environmental and Occupational Health Safety (ANSES) is a
public organization of an administrative nature, which undertakes monitoring, expert appraisal,
research and reference missions and implements independent, multi-disciplinary scientific
expertise. Its principal mission is to contribute to the protection of human health with respect
to the environment, the workplace and food. Key staff: Karine Vin, leader of the WP on
reformulation of JANPA. Jean-Luc Volatier, senior statistician, Deputy Director of the Risk
Assessment Department, working in the field of dietary exposure and quantitative risk
assessment since 1993. Julie Gauvreau, responsible of the Oqali project since 2012 (Anses),
contributor to the JANPA and Euremo implementation. Affiliated entities: Santé publique
France (SPF) is the French national public health agency, a governmental institution reporting
to the Ministry of Health. Created in 2016, SPF brings together the French Institute for Public
Health Surveillance (InVS), the National Institute for Prevention and Health Education, and the
Date: 09/07/2020 74 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Health Emergency Preparedness and Response Agency. Key staff: Anne-Juliette Serry is the
head of the Nutrition and Physical Activity Unit at SPF, coordinates the prevention programme
of the Agency, an expert in social marketing and communication. Hélène Escalon, PhD on health
economics, works on nutrition and physical activity and on food marketing, Doriane Fuchs works
on public health and international affairs, at SPF follows the nutrition- and physical activity-
related developments. The French Ministry of Solidarity and Health (MoH-FR) leads across
health, social affairs, solidarity and social cohesion by leading national policies and legislation,
providing the cohesion by leading ambition to meet current and future challenges, putting
health and solidarity at the heart of government. Within the MoH, the Directorate General for
Health (DGH) is responsible for the elaboration of Public Health policies, disease prevention and
health promotion. Key staff: International Affairs Advisor / nutrition: Mrs Roxane Berjaoui,
Public Health medical doctor, International Affairs advisor at the MoH, involved in an
international program and network on nutritional labelling, in national collaboration on physical
activity. Nutrition expert: Mr. Michel Chauliac, Public Health medical doctor in charge of the
French National nutrition and Health Programme at the MoH level, French representative at the
HLG on nutrition and physical activity at EU DG Santé level, was the technical coordinator of the
JANPA 2015-2017.
GERMANY: The Max Rubner-Institut (MRI), the Federal Research Institute of Nutrition and
Food, advises the Federal Ministry of Food and Agriculture (BMEL) in the area of consumer
health protection in the nutrition sector. With different scientific focuses, the quality rating of
foodstuffs in terms of nutritional physiology and health, food safety and bioprocess engineering
as well as the research on nutritional behaviour is investigated in the nine departments of the
MRI. Key staff: Prof. Dr. Ingrid Hoffmann, nutritionist with main research interest in the effects
of different dietary regimens on health, environment and society, in nutritional behaviour,
modelling of complex nutrition aspects, nutrition epidemiology, nutrition and sustainability,
head of the Department of Nutritional Behaviour at the MRI, Federal Research Institute for
Nutrition and Food, responsible for the National Nutrition Monitoring, National Food
Composition Data Base and Product Monitoring. Irmela Demuth, a nutritionist and a Research
Associate at the Department of Nutritional Behaviour, 3 years of experience in the field of
reformulation of processed foods, contributed to the setup of a baseline database and is now
responsible for developing and implementing the German Product Monitoring of processed
food.
GREECE: The Institute of Child Health (ICH) carries out applied research and educational
activities in special fields of child health and has experience in European projects as coordinator
and as a partner. The Department of Developmental and Social Pediatrics (DDSP) works on
developmental pediatrics and the development of evidence-based national protocols for
pediatric primary care, including prevention and the promotion of child health. Key staff: Dr.
Ioanna Antoniadou, MD Pediatrician, Director of DDSP, 35 years of experience in social and
developmental pediatrics, participating in national committees regarding the promotion of child
health and the national dietary guidelines. Dr. Adamantia Xekalaki, MD Pediatrician, works on
the development of good practices on pediatric primary care and participates in health
education and health promotion activities. Dr. Venetia Vraila, MD Pediatrician, works on the
national initiative of breastfeeding promotion and has years of experience in research. DDSP will
collaborate with Dr. Mary Yannakoulia (Associate Professor of Nutrition and Eating behavior)
and Dr. Meropi Kontogianni (Assistant Professor of Clinical Nutrition). Both are related to
human nutrition and are the representatives of Greece in the High Level Group of Nutrition and
Physical Activity (EU) and members of the Nation (Greek) Nutrition Policy Committee,
experience in issues related to food reformulation, food procurement and marketing of foods
to children.
HUNGARY: Semmelweis University (SU) is the medical university of Budapest, the capital of
Hungary, with over 240 years of tradition of medical treatment, education and clinical &
preclinical research, supported by its 5 faculties, 27 clinics and theoretical institutions. Beside
the education activities, the institute is involved in or is leading numerous international and
Date: 09/07/2020 75 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
national research and development projects including EU Joint Actions. Key staff: Albert Zoltan
Aszalos, MA in Economics, MPhil in Law, Executive MBA and MSc in Data Science, experience in
the management and communications of the Health Workforce and the Chronic Diseases EU
Joint Actions, EIT Health projects and in health workforce. Zoltan Csipke, born and raised in the
US, PhD from the UK. Eva Csecsodi, MA in International Relations and European Studies, 7 years’
professional experience in the fields of international communication and project management.
Affiliated entity: National Institute of Pharmacy and Nutrition (NIPN) with the Directorate
General of Food and Nutrition Science is an institute working in the field of nutrition under the
Hungarian Ministry of Human Capacities carrying out scientific research, professional-
methodological, educational tasks. Its main research focus is conducting national diet,
nutritional status and school nutrition surveys, data from these are key inputs to policy making.
Key staff: Edit Feigl- dietitian, Deputy Head of Division of Food and Nutrition, 30 years of
experience in public catering. Andrea Zentai -Head of Department of Nutritional Epidemiology,
15 years of experience in public catering and public health. Márta Bakacs- epidemiologist, 25
years of experience in Public Health Nutrition and dietary surveys. Anita Varga -dietitian and
nutritionist, Deputy Head of Department of Applied Nutrition, experience in public catering,
food- and nutrition related surveys. Eszter Sarkadi-Nagy biologist, PhD in Nutrition, senior
nutrition consultant, with experience in diet and nutritional status surveys.
IRELAND: The Department of Health's (DoH) mission is to improve the health and wellbeing of
people in Ireland by delivering high quality health services and getting best value from health
system resources. Key staff: Ursula O’Dwyer- Dietitian, Health Promotion Policy Advisor in
Health and Wellbeing in the DoH, 30 years’ experience as Nutrition Policy Advisor/ Health
Promotion Advisor with the Department, Irish Representative on the EU HLG on Nutrition and
Physical Activity. Seamus O’Reilly – an Assistant Principle in Health and Wellbeing in the DoH, is
an experienced civil servant. Affiliated entities: The Centre for Health & Diet Research (CHDR)
was established in 2008 with funding from the Irish Health Research Board and is now regarded
as the leading centre in transdisciplinary research in diet, physical activity and nutrition across
the life-course in Ireland. Key staff: Dr Ivan J Perry -Professor of Public health at University
College Cork (UCC)–PhD in Epidemiology, over 20 years’ experience of cardiovascular disease
and nutritional epidemiology. Dr Janas Harrington -Senior Lecturer in Public Health Nutrition,
UCC - PhD in Public Health Nutrition, 10+ years of experience in Public health nutrition. Prof
Kevin Balanda- UCC and Institute of Public health in Ireland–PhD in mathematical modelling,
over 20 year of experience of chronic disease modelling and research translation, set up Ireland’s
Obesity Observatory and led Ireland’s contribution to the EU JANPA project on the lifetime costs
of obesity. The Food Safety Authority of Ireland (FSAI) was established in 1999, under the aegis
of the Minister for Health, as the national competent authority for food safety and food law. Key
staff: Senior Researcher-Dr Mary Flynn– Registered Dietitian, PhD in Nutrition, Professor of
Nutrition at Ulster University and Chief Specialist Public Health Nutrition at FSAI, 25 years’
leadership experience in public health programs, staff and student management. Researcher –
Ms Oonagh Lyons – BSc. Physiology, MSc. Human Nutrition, Technical Executive Public Health
Nutrition at FSAI, advanced statistical analysis training, 5 years’ experience in public health,
nutrition-related food legislation and Codex. Junior Researchers– early career graduates and
undergraduates (in third year of BSc in Nutrition) awarded one-year work placements with the
Public Health Nutrition team at FSAI following a competitive process involving Irish Universities.
ITALY: The mission of Istituto Superiore di Sanità - Italian National Institute of Health (ISS) is to
promote the scientific research in Italy and to provide technical and scientific support to the
National Health System. Key staff: Marco Silano, MD Pediatrician, Senior Investigator and Head
of the Department of Human Nutrition and Health, member of several Working Groups at Italian
Ministry of Health, that address public health issues, such as breastfeeding, weaning and celiac
disease diagnosis, member of the Management Board of the JPI-HDHL and Principle Investigator
at ISS for H2020-funded project STOP and FOOD. Olimpia Vincentini, Bachelor in Biology and
PhD in Human Nutrition is currently, a researcher at the Department of Food Safety, Nutrition
and Veterinary Public Health-ISS, involved in FOOD project and H2020-funded project
SEAFOODTOMORROW. Stefano Lorenzetti, Bachelor in Biology and in Human Nutrition, a
Date: 09/07/2020 76 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
researcher at the Department of Food Safety, Nutrition and Veterinary Public Health - ISS,
involved in H2020-funded project SEAFOODTOMORROW and was involved in LIFE-EDESIA
project.
LATVIA: The Centre for Disease Prevention and Control (CDPC) is the Ministry of Health's direct
administrative authority in the country to implement national public health policy in the field of
epidemiological safety and disease prevention. CDCP has also taken part in prominent EU-
funded Joint Actions: EPAAC, ORPHANET, EUROSTAT, JANPA, MH-NB, HA-REACT, EU-JAV,
INFACT. Key staff: Iveta Pudule-MD, MSc health promotion research, over 36 years’ experience
in public health research; 16-year experience in EU projects, among them EURO-PREVOB funded
under 6FP - Coordination Action linking science and policy-making to tackle obesity in Europe,
project coordinator in Latvia; member of Latvian Diet and nutritionist association. Lāsma Piķele–
Nutritionist (B.Nutrition), MSc. Business management, 5 years plus of experience in
governmental sector as senior officer and senior expert on nutrition at the Ministry of Health,
member of several governmental working groups and commissions.
LITHUANIA: Ministry of Health of Lithuania (LR SAM). Overall responsibility for general
supervision of the entire health system is held by the ministry of health (MoH). The MoH is
strongly involved in drafting legal acts and issuing regulation for the health sector. It also runs
health care facilities and public health institutions and has the overall responsibility of health
system performance. The main aims of the MoH are the development, organization,
coordination and control over the implementation of state policy in four fields: individual health
care, public health, pharmaceutical activities and health insurance. Key staff: Ieva
Gudanavičienė -chief specialist of Health Promotion Division of Ministry of Health of Lithuania,
responsible for healthy nutrition legislation for society, organises, coordinates and monitors the
implementation of healthy nutrition policy for children and adults and organised collective
groups, breastfeed babies, infants and young children's complementary food, 15-year
experience in area of healthy nutrition and food safety.
MALTA: Ministry for Health (Ministeru tas-Saħħa) (MFH) is the Ministry responsible for Health
in Malta. The main roles of the Ministry are to direct health policy and the delivery of healthcare
services as well as health protection and regulation. The Public Health Regulation Department
is the main entity responsible for public health in Malta, with the responsibility of safeguarding
public health, licencing, monitoring and inspecting the provision of healthcare services with
respect to quality and safety. Key staff: Prof. Charmaine Gauci – is a consultant in Public Health
Medicine, 3 years’ experience in Superintendent of Public Health, has been the Director of the
Health Promotion and Disease Prevention Directorate, Associate Professor at the University of
Malta, PhD Degree in communicable disease epidemiology and has participated in a number of
research and EU projects and Joint Actions. Dr Maya Podesta- a Public Health Medicine
Specialist, has worked on a number of EU and research projects, 5 years of experience working
on communicable and non-communicable diseases. Dr Elaine Lautier- a Public Health Medicine
Specialist, involved in a number of EU projects covering various areas and is part of the Strategy
Development and Implementation Unit. Ms Charlene Vassallo- a Scientific Officer at the Health
Promotion and Disease Prevention Directorate, most of her work is related to the area of Heathy
Eating, involved in the National Food Consumption survey and numerous EU and research
projects including JANPA the Euremo project amongst many others.
NETHERLANDS: The National Institute for Public Health and the Environment (RIVM) has been
promoting public health and safeguarding a healthy environment for more than 100 years. RIVM
has a central role in infectious disease control and national prevention and population screening
programs and conduct independent (scientific) research in the field of Public Health, Health
Services, Environmental Safety and Security. Key staff: Dr. Marieke AH Hendriksen - interim
head of the department of Nutrition and Health, with 12 years’ experience in research on
nutrition and health.Dr Ivon EJ Milder -works at the RIVM as a project leader at projects on
nutrition, healthy lifestyle and prevention of overweight, project leader of Monitoring of Food
reformulation in the Netherlands at the RIVM and co-director at WHO and involved in the WHO
ESAN collaborating centre Nutrition and in the EUREMO project. Dr Elisabeth HM Temme-
Date: 09/07/2020 77 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
senior scientist at RIVM, experience as a project leader of complex and multidisciplinary projects
with many stakeholders, developed the food reformulation monitor in the Netherlands, co-
director at WHO cc Nutrition, involved in projects funded by the EU, such as JRC/WHO “Nitrogen
and food project” and SEAFOODtomorrow.
POLAND: The Medical University of Silesia (SUM) is the largest medical school in Poland. SUM
carries out active international cooperation within “Lifelong Learning Programme” and has
entered into many partnership agreements with medical universities and research centres
worldwide. The School of Health Sciences was established in 2002 as one of the schools of the
Medical University of Silesia and provides opportunities to study public health and dietetics at
the bachelor’s and master’s levels and PhD studies as well. In the field of research school’s
employees conduct numerous research projects in areas such as: epidemiology, environmental
health, biostatistics, health promotion, health policy and politics, health economics, health care
management, and nutrition. Key staff: Elżbieta Grochowska-Niedworok-Associate Professor/
Dean of School of Health Sciences in Bytom - researcher, public health and dietetics (community-
based health promotion; nutrition and physical activity; over 30 years’ experience in research),
Katarzyna Brukało- PhD-researcher, public health and dietetics (health policy, food and
alimentary policy, health and social inequalities; 7 years’ experience in research).
PORTUGAL: Directorate-General of Health (Direção-Geral da Saúde) (DGS) mission is to
regulate, guide and coordinate activities to promote health and disease prevention, defining the
technical conditions for providing adequate health care, plan and program the national policy
for quality in the health system and ensure the development and implementation the National
Health Plan and also the coordination of international relations of the Ministry of Health. Key
staff: Dr. Maria João Gregório – Invited Assistant Professor of Nutrition Policy at the Universities
of Porto, PhD in Food Consumption Sciences and Nutrition, Director of the Portuguese National
Program for Healthy Eating Promotion, 10 years’ experience in research in the field of nutrition.
Affiliated entity: The Faculty of Nutrition and Food Sciences (FCNAUP) is the only Portuguese
public university institution totally devoted to Human Nutrition. The Faculty participates in other
EU funded research projects, such as: ANEMOS, ENHR II, PRO GREENS, EPHE. Key staff: Dr. Pedro
Graça –Invited Associate Professor of Nutrition Policy at the Universities of Porto, PhD in Human
Nutrition, Dean of FCNAUP, was the Director of the Portuguese National Program for Healthy
Eating Promotion between 2012-2018, 20 years’ experience in research in the field of nutrition.
ROMANIA: The National Institute of Public Health Romania (NIPH) is the methodological and
technical adviser of the Ministry of Health in the area of public health. It participates in the
development of public health polices and the coordination and implementation of national
public health programmes such as health promotion, national cancer screening programmes,
vaccination, communicable diseases, community health. Key staff: Dr Alexandra Cucu –
Associate Professor, MD, PhD, Department of Specific Sciences at “Carol Davila” University of
Medicine Bucharest - Faculty of Midwives and nursing, Director of the National Centre for Health
Status Evaluation and Health Promotion, 25 years’+ experience in: Health promotion activities,
Public health policies, strategies, normative acts elaboration, Quantitative and qualitative
research activities, Regulation impact assessment, Health impact assessment, Health
information system planning and development, Project management etc. Dr. Corina Zugravu -
MD, PhD, an associate professor of food hygiene and nutrition at the University of Medicine
Carol Davila from Bucharest and is a senior advisor in the field of nutrition at the National
Institute of Public Health, 29 years of experience in public health nutrition, food safety and
security, health promotion and food reformulation. 3 Senior Public Health and Management
specialists - MD, with more than 10 years of experience in public health, health promotion and
education for health, and health policy.
SERBIA: Institute of Public Health of Serbia "Dr Milan Jovanović Batut" (IPHS) (Institut za javno
zdravlje Srbije “Dr Milan Jovanovic Batut”) is a national expert institution for public health, which
provides advice, support and guidance for the Serbian government and conducts independent
research on issues related to public health in Serbia. Main areas of activity are: analysis, planning
and organization of health care, information with biostatistics, health promotion, control and
Date: 09/07/2020 78 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
disease prevention, hygiene and human ecology and microbiology. Key staff: Verica Jovanovic,
MD, PhD, Primarius, Associate Professor, Acting Director of the Institute of Public Health of
Serbia, specialist in social medicine, Master in Health Services Management, PhD in Public
Health, Head of Cancer Screening office, 20 years of experience in Public Health and Project
Management. Milena Vasic, DMD, PhD, Associate Professor, Head of Department for
International Coordination and Project Management, specialist in social medicine, Master in
Health Services Management, MSc and PhD in Social Medicine, 20 years + of experience in Public
Health. Jelena Gudelj Rakic, MD, MSc and PhD in nutrition, specialist in hygiene, Head of Centre
for Health Promotion, 20 years of experience in research and projects related to public health,
in particular nutrition, food safety, non-communicable diseases, health promotion and
education. Dr Biljana Kilibarda, DMD, PhD, is public health expert with 20 years of experience
in health promotion. Her activities comprise of research including general population surveys,
monitoring and coordination of projects/activities and campaigns focused on leading risk factors
for non-communicable diseases.
Date: 09/07/2020 79 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
9.6 Risk Analysis and Treatment
RISK LIKELI- PROPOSED RISK TREATMENT AND
ID IMPACT
TITLE/DESCRIPTION HOOD CONTINGENCY PLAN
AVOID: WP 1 will work together with
WP 3 to evaluate the mgmt. and
WP 1 - mgmt. and
meeting structure through regular
meeting structure do
R1 2 3 surveys throughout the entire
not fulfil the anticipated
duration of the JA and adapt
objectives.
structures, meeting schedules if
necessary.
AVOID: A detailed mailing list of
WP 1 – Associated
contact persons will be put in place
Partners could be
with at least 5+ contact persons per
passive in
organisation, ensuring that someone
communication with the
is always on hand to answer
R2 Project Management 3 3
important requests. The PMT will
Team (PMT), could offer
communicate with partners through
little feedback and not
various comm. channels (telephone,
respond to important
face to face meetings along with e-
requests.
mail).
AVOID: Preparation for the interim
and financial reports will begin at
WP 1 – Associated least 2 months before the reporting
Partners and WPL will deadline. Reporting workshops will
not submit necessary be organised to educate the partners
R3 3 3
reporting materials on about preparation of the reports.
time for the interim and Templates will be prepared to
financial reports. minimize the amount of work per
partner. Bilateral webinars will be
organised for reporting instructions.
AVOID: Regular 6 monthly reports will
be gathered by the PMT to monitor
financial expenditure and propose
WP 1 – Associated
redistribution of budgets if necessary.
Partners will not adhere
Bilateral communication will be held
R4 to planned budget and 3 4
between the PMT and individual
will under or over
partners regarding expenditure,
spend.
partner specific feedback will be given
on budgets following every 6 month
report.
AVOID: Deliverables will be tracked by
each WPL and by the PMT, who will
discuss the status of all planned
WP 1 – Associated
deliverables in the reporting period at
Partners will not fulfil
SC meetings. 1 month prior to the
their planned
delivery of the milestone/deliverable
obligations, will not
R5 2 5 the PMT will be in touch with the WP
deliver planned outputs,
about the status, helping to find a
or will do so with
solution if a delay is expected. Real-
significant delay,
time consortium changes will be
changes to consortium.
monitored for possible amendments,
tasks will then be re-shifted between
partners.
Date: 09/07/2020 80 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
AVOID: The JA faces a volatile
situation regarding potential future
waves of the COVID-19 epidemic in
the EU. Care will be taken by the PMT
and WPL to adhere to the meeting
schedule, replacing face to face
meeting with online meetings
WP 1 – COVID-19 throughout all WPs, if travel
epidemic to impact restrictions are in place. Careful
R6 successful 3 5 monitoring will be carried out in
implementation of the conjunction with WP 4 to monitor the
JA feasibility of implementation of
proposed measures in food policy in
order to offset any potential non-
uptake/compliance within MS, in
event of economic
recession/restructuring of funds for
priority funding to COVID-19
measures.
WP2 - Some core topics
of the JA may prove to
be highly sensitive and
even political issues,
AVOID: The content of such
especially food
communication as well as the
reformulation and food
communication channels will be
R7 marketing that may 3 3
under tight control to avoid any
draw a wide spectrum
potential clash of interests on social
of feedback from the
media.
industrial and
healthcare stakeholders
as well as the lay
audience.
AVOID: Local Stakeholder Forums
have been planned as a mandatory
WP2 - Associated
activity for each Competent
Partners will not be
Authority, with budgets allocated for
active in disseminating
R8 4 2 this activity. Partners will be
Best - ReMaP content in
encouraged to organise these at each
local and national
GA meeting and by e-mail
networks.
communication.
AVOID: The Dissemination Team will
WP2 - Partners may not
be in constant contact with the PMT
be active in notifying
and WPLs and will attend key
Dissemination Team of
R9 3 4 meetings in order to proactively
content for the
follow WP developments, which will
newsletter and website
be communicated by various
update.
channels.
AVOID: Different events will be
WP 2- Specific
tailored to different groups of
stakeholders may be
stakeholders in order to efficiently
unsatisfied with their
R10 3 3 promote their inclusion. Each WP will
level of inclusion in the
include their own stakeholders in
JA or with
working groups. Stakeholders can
developments in WP.
attend PDMF or national Local
Date: 09/07/2020 81 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Stakeholder Forums to discuss
specific issues face-to-face.
WP 2 – The successful
distribution of the 2
promotional movies to
AVOID: Ministries will be contacted
public schools in the EU
well in advance. Person(s) with the
member states is
R11 3 4 right network and position will be
dependent on the
identified and involved in the
support of the
distribution of the films.
countries’ Ministries of
Health and/or
Education.
AVOID: Many partners in the JA are
experienced in JA-work and therefore
WP3 – The partners are familiar with the evaluation
not keen to participate procedures. WP-leaders are involved
in data collection with the evaluation work together
R12 3 4
necessary for the with the WP3, and thereby increasing
evaluation. the likelihood of acceptance and
motivation to participate in the work
related to the evaluation. Regular
reminders will be made.
REDUCE: The workflow related to the
WP3 - Changes in evaluation is created and
key personnel documented so that all the
involved in the information related to the evaluation
R13 4 3
evaluation. are readily available within THL. It is
the responsibility of THL to recruit
suitable replacements in the event of
changes in the personnel.
AVOID: The organization leading the
WP3, THL, is also participating in the
work of WP5, WP6 and WP7. To
WP3 - Conflict of minimize the risk of possible bias, the
interest related to key personnel at THL participating in
R14 the evaluation. 2 4 the work of WP3 (including the WP3
leader) are not participating in the
work of the other WPs. In addition, an
external evaluation will be conducted
by subcontracting two independent
external evaluators.
REDUCE: Sending timely invitation for
WP4 - Low participation the events with a letter explaining the
by policy makers and JA and the relevance of the policies to
R15 decision makers from 3 4 be transferred
Member States at the Upgrading the invitation through
Policy Dialogue Events. direct phone calls, reminders,
personal contacts
REDUCE: Define with European actors
WP4- Low sustainable (High Level Group, JRC, DG santé,
impact of Best-ReMaP possible Food system indicators in EU
R16 4 4
outcomes on National semester) a European governance for
Policies Nutrition and a European Healthy
food supply for children to assure real
Date: 09/07/2020 82 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
improvements on national nutrition
policies.
WP4 – Delayed
finalization of the first
version of the
REDUCE: Definition of intermediate
“Considerations for
R17 1 4 steps in the drafting of the report with
Member States on How
time due
to Integrate the Best-
ReMaP Outcomes into
National Policies”.
WP4 - Not enough REDUCE: Frequent contacts with the
R18 collaboration with the 2 3 other WP leaders via call conference
leaders of the core WPs and e-mail
AVOID: Should another COVID-19 or
WP 4 – COVID-19
another epidemic happen in the EU,
epidemic to impact
WP4 will have a contingency plan for
R19 successful 3 5
moving all dialogues, events
implementation of the
dialogues and meetings to online
WP4
platforms.
SHARE: In link with the WP4, prioritise
involvement of national decision-
makers, European Commission,
WP5 - Implementation CHAFEA, JRC. Several meetings,
R20 3 4
of tools not sustainable. conferences and workshops are
planned during the JA to address
sustainability. The JRC food database
must be available for the EU MS.
AVOID: The participants of the JA are
well informed and many involved in
other European projects, this will be
monitored at SC and GA meetings.
WP5 – Lack of synergy
The JRC food database must be
between Best-ReMaP
compatible with the JANPA
R21 and other European 2 3
methodology and the Oqali food
projects & bodies
classification.
(EUREMO, OMS, JRC).
Data produced during the Euremo
must be available (M24) and
compatible with the Oqali food
classification.
AVOID: Evidence based policy making
WP6 – AVMSD
strategies to coherently raise interest
transposition not a
R22 3 5 of relevant sectors to participate;
priority at the national
engagement with national regulators;
level
WHO supportive role employed.
MITIGATE: Digital marketing is a new
phenomenon; additional developing
WP6 – Monitoring of
evidence will be studied. Experiences
digital marketing rather
R23 of non-EU countries and WHO taken
unknown, demanding
on board; internal development of
and very complex issue
measurement of follow up
approaches
WP7 – Lack of common
Additional efforts will be put into the
R24 understanding of the 2
trainings and workshops, WP leaders
action and knowledge
Date: 09/07/2020 83 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
on the legislative will consider additional webinars with
requirements among the individual MS.
different sectors
The activity and the training are to be
explored, developed and
WP7 – Lack of interest
implemented and the interest raised
R25 to join the activities and 1 4
among MS participants through
the training.
timely engagement, promotion and
inclusion in WP tasks.
Types of the engaged institutions will
be additionally explored and defined,
WP7 - Selection of the
R26 2 4 taking into account national
institutions type.
structures and context so as to be
better employed
Procurement officers participating in
WP7 - Identification of the JA should explicitly support
R27 the institutionalized 2 5 individual MS in finding the
focal point. institutionalized approach in the
national/regional context.
9.7 Financial management
The financial management of the JA will be undertaken by the Project Management Team,
specifically the dedicated Financial Officer. The entire Project Management Team has extensive
experience in financial management and has successfully coordinated four large-scale Joint
Actions, spanning a nine-year period. The Financial Officer is well acquainted with the rules and
regulations of the funding mechanism and has experience in management of Joint Action and
partner budgets. We will use dedicated project management software (4pm), which NIJZ has
modified for the purposes of the specific projects we are coordinating. We will be requiring all
partners to fill in timesheets and upload their financial documents (invoices, salary slips, proof
of travel costs, etc.) to the system. Such a method ensures greater transparency, is more
efficient and has already been used and is well-tested by NIJZ for other projects, including Joint
Actions. In this way, we will be able to have a greater overview of the partner budgets and
expenditure according to the planned budget. In order to monitor expenditure, we will require
partners to submit a financial progress report every six months. These reports will be carefully
reviewed, with specific recommendations/action points to be issued for each partner based on
their expenditure/quality of reporting. We will communicate with partners via e-mail, telephone
and webinars (series of bilateral webinars between the Project Management Team and the
financial officers of the partner institutions will be organised around key financial reporting
milestones, such as the interim and final reports). Additionally, each General Assembly meeting
gathering the Associated Partners will have at least one agenda point dedicated to financial
management. We foresee workshops on financial reporting to be held within a minimum of two
General Assembly meetings (including an FAQ portion based on our own extensive experience
and interactive session for Q&A on specific issues). Financial reporting will also be covered in
the partnership Consortium Agreement. The Project Management Team will act as liaison on
financial management between the partners and CHAFEA, whom we will notify if there are
significant deviations from the planned budgets or partnership structure. If necessary, we will
propose amendments to the Grant Agreement based on a specific need that is currently
unforeseen.
Date: 09/07/2020 84 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
10 BUDGET
10.1 Content description and justification
The budget for the Best-ReMaP JA was built on realistic cost planning for all budget categories,
including staff, travel, subcontracting, equipment and other costs. The budget tables included in
this proposal are only the summary tables – the framework for the included tables is a detailed
Excel spreadsheet with one sheet per partner, including all detailed costs itemised per category,
including names of staff, specific travel costs, specific descriptions for other costs, etc. In order
to compile the overall budget, the WP Leaders were requested to provide an estimate of staff
effort (minimal and ideal) in person months per partner in their WP, per task. The partners were
asked to provide person month costs for three staff categories – junior researcher, researcher
and senior researcher (correlates to usual person month cost per personnel ranking). A
comprehensive list of WP meetings was compiled to realistically calculate the budget for travel
costs and anticipate synergies. The coordination team compiled each partner budget from the
gathered data and asked for feedback and modifications to the budget tables. The coordination
team made sure that the costs were justified based on the proposed tasks to be executed per
partner.
Since the initial proposed budget was too high, the coordination team had to reduce the budget
to the appropriate amount. This was done through streamlining budgets for WP Leaders and
ensuring that partners received a fair percentage of EU co-funding based on their involvement
in specific tasks within the proposal. A final cross-check was done to ensure that all partners had
the necessary costs planned in their budgets for the tasks mentioned in the proposal. Daily
communication occurred between WP Leaders, individual partners and the coordination team
to ensure that the budget planning would be on track and accurate. The entire planning process
for the JA budget was coordinated over a four-month period.
The two pie charts below represent PM distribution per WP and budget per cost category. As
can be seen, the PM per WPs are fairly evenly distributed. The majority of the budget will be
incurred for personnel costs, with just under 14% for other costs (travel, subsistence, equipment
and other goods and services) and slightly over 6% for subcontracting (for expertise in three key
fields, as detailed below).
Date: 09/07/2020 85 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Just over 6% of the overall Best-ReMaP budget is planned for subcontracting. The cost is spread
across 8 individual partners – specific tasks within WPs where subcontractors are foreseen are
mentioned in the WP descriptions in italics. The planned subcontracting can be divided into
three broad types of specified services:
Types of subcontracting in the Best-ReMaP JA
Detailed stakeholder analysis (SI - WP 4), Analyses of EU policy with
Expert Input, regards to equity and sustainability (IT – WP 4), , expert
Analyses consultation about Nutrition Profile and EU-wide harmonised and
comprehensive monitoring protocol for food marketing (LV – WP 6)
Implementation of workshop results in national contexts (IE- WP
Piloting and
6), implementation of pilot food catalogue in other Member States
implementation
(SI – WP 7), legal expertise for public tender (AT – WP 7)
Key Support to Production of promotional video (HU – WP 2), external evaluation
Horizontal Activities (FI – WP 3), Organization of Final conference (FR – WP 1)
Date: 09/07/2020 86 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
DETAILED SUB-CONTRACTING DESCRIPTION BY PARTNER
AND THEIR AFFILIATED
NIJZ
Subcontracting for tasks within the entire JA (1 subcontractor):
Specific expertise on health equity in complex obesogenic food environment, relevant for
food reformulation, and especially for reducing food (digital) marketing and public
procurements of foods will be delivered to support JA Best-ReMaP foreseen policy
recommendations, providing proportional universalism in those recommendations and thus
leaving no-one behind.
The food environment is one of the most important socio-economic upstream determinants
of health and wellbeing of children in EU and worldwide. Health equity issues are the
overarching theme of the Joint Action Best-ReMaP. Different aspects of food equity are
highlighted in relevant content work packages 5, 6, and 7. At the same time, WP4 and WP2
will address health equity within the evidence based sustainable policy frame and with
regard to different JA target audiences. In spite of the fact that more and more evidence on
food as a driver of equity is available, disaggregated by social class and education, there are
areas of research where little if anything is known about the impact of food environmental
determinants on health equity, such as equity dimension of digital marketing of foods to
children and food public procurements impact on health equity in children. Consortium
partners are capable to deliver the already available evidence but would have to be
supported with specific expertise on the equity dimension, connecting specific food issues
and health equity, as was pointed out by proposal evaluators.
Subcontracting in WP4 (1 subcontractor):
Data on a wide range of stakeholders, active in the field of childhood obesity, highlighting
the topics of food reformulation and food marketing, are already available from different
running initiatives. As part of the JA Best-ReMaP project, we would like to update and
upgrade those already available data and perform a more detailed analysis of stakeholders,
interested and relevant for the area of public procurements of foods. Based on the already
developed and upgraded methodologies and experience gained in the past, the analysis will
include:
- Support in the identification of the key stakeholders in the area of public food
procurements;
- Descriptive analysis of a stakeholder network, relevant for public procurements of
foods.
- Analysis of network structure (including clustering of stakeholders according to
network structure) and formation of stakeholder alliances according to the context
of operation and attitude to specific topics in JA Best-ReMaP (for the analysis of
network structure, the application of block modelling techniques is expected).
Subcontracting in WP7 (1 subcontractor):
Selected subcontractor will:
- Prepare and provide training materials: development of the training materials
based on good practices experiences; testing of the training materials and tools
at the trainings; finalization of the training materials, with the defined training
protocol end evaluation templates.
- Design a Pilot English-language Catalogue of food products, for selected food
groups (minimum one selected food group, harmonized in the participating
MS).
- Practically organize Joint execution of public tender with harmonized timing
among all the participating MS.
Date: 09/07/2020 87 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
- Provide the connection with the selected stakeholders in the intersectoral group
and share knowledge and implementation insights at the intersectoral groups
meetings in the interested member states; together with the importance of
multidisciplinary competence;
- Enable market analysis in its entirety, updated by the individual interested
member states
- Provide template of a pilot version of a Food Catalogue, based on EU and national
legislative.
- Provide key implementation concepts, relevant for high quality food
procurements processes, as the input to the template formulation, for the
snapshot of the current state in the interested member states
- Enable Foodex 1 and 2 categorizations in the pilot Food Catalogues, tailored to
national manufacturers practices;
- Contribute in formulation of the case study template, with specific
implementation insights, and contribute in interpretation of the results
BMASGK
Subcontracting in WP7 (1 subcontractor):
Public Procurement of foods in Austria is done by public bodies in many different
ways. School food procurement can be done by the single school, the community or
the region for example. Hospitals do their procurement for every organisation (e.g.
a single hospital, an organisation with more hospitals or the community or the
region).
Austria has a procurement agency which also does procurements for public
institutions like Ministries.
Consequently, as the Austrian Ministry of Health do not have the competence and
capacity to test a procurement tool, we will have to find an organisation (the
subcontractor) which would do this work within Best-ReMaP. This organisation, as
it will be additional work load for them, will need funding. Subcontracting will be
needed for practical field work (development, adaptation, testing of any tool which
should facilitate the procurement in public institutions, as defined in WP7 of the
proposal).
THL
Subcontracting in WP3 (2 subcontractors):
It is the responsibility of the WP3 which is coordinated by THL, to develop and
coordinate the activities related to the evaluation. Most of the work related to the
evaluation will include contributions from both THL and all the partners who are
participating in the JA. Therefore, this part of the work related to the evaluation is
at least partly considered to be internal evaluation (i.e. the partners conducting the
work of the JA will also contribute to the evaluation).
In addition to this, as described in the application, there will be an external
evaluation. This means we will need to have organizations or persons not directly
linked to the JA, to conduct part of the evaluation work. As per definition of
"external" evaluation, these need to be organizations or persons who are not
participating to the actual substance work of the JA. The need of external evaluators
stems from the fact the only this way we can ensure completely objective review of
the activities and results of the JA. The external evaluation contributes to the overall
evaluation of the implemented activities and their impacts according to the
evaluation plan.
Date: 09/07/2020 88 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Accordingly, in order to cover the costs related to the work of the two external
evaluators, subcontracting of 2 person months has been budgeted as
subcontracting. It is not a question about the JA not having the expertise
themselves, but the requirement of external evaluators (which cannot be part of
the JA) which requires subcontracting.
MoH-FR
Subcontracting in WP5 (1 subcontractor):
According to the usual practice of the communication department of the French Ministry of
Health (MoH-FR), the logistic organization of the communication events is taken in charge
by a subcontractor chosen for a period of several years by a specific public procurement
procedure.
MoH-FR subcontracting costs will include catering (coffee breaks, lunches and dinners,
conference room cleaning and security, technical assistance in the conference amphitheatre
of the Ministry, hostesses and cloakroom for approx. 250 persons, travel and
accommodation for non-Best-ReMaP participants, organized by the Ministry's travel agency,
printing and shipment of communication materials, possibly simultaneous translation.
SU
Subcontracting in WP2:
Specialised film studio to achieve the highest possible project impact (1
subcontractor)
Semmelweis University is the largest medical university of Hungary based in Budapest, the
capital city. The university participates in a wide range of national and international projects,
and in quite a few it also undertakes the role of leading or contributing to the
communications activities. The university employs a range of specialists to support this
work, including communications experts, social media (Facebook) campaign specialists,
visual graphic designers, etc. to support the ongoing operation of communication activities.
Preparation of project promotion films are not regular activities for the university, therefore
the university does not have a film studio where all the experts needed for a quality film
would be employed. On those occasions when films are needed, the film making is
subcontracted through a tendering process to a film agency which is most suited for the
task, for the preparation of e.g. animation, or documentary or social media films. This
ensures that a film with the best visual contents and the highest impact will be prepared, to
reach the maximum number of audiences, which is key for the success of the
communication activity of the project. This practice is also in line with our current
communications activities as leader of the communications work package of the Chrodis
Plus JA (2017-2020).
Subcontracting Facebook campaign advertisement costs (1 subcontractor)
Facebook campaigns are a highly influential part of WP2's communication strategy in the
Best-ReMaP project. Without these paid campaigns WP2 would not be able to promote the
results of the project effectively. However, payment for Facebook campaigns are possible
only by a credit card, and there is no option to pay via bank transfer.
Semmelweis University is a public institution and its internal regulations do not allow
payments by credit card. Therefore, WP2's only option is to pay for these campaign through
a subcontractor, by paying them for the campaign costs. The selection of the most suitable
subcontractor for this task will happen via tendering as per local laws and the university's
internal regulations.
Date: 09/07/2020 89 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
CHDR
Subcontracting in WP6 (1 subcontractor):
The first priority of WP6, is to provide effective and sustainable marketing practices
to be integrated into national policies in interested EU MS. This is to protect the
health of European children, one of the most important assets in the future EU.
One of the biggest threats to children's nutritional health is the monumental
increase in digital marketing, where advertisers and sponsored bloggers have
increasing access to our children (children are defined up to 18 years of age). This
important area was identified at the early EU MS planning meetings WP6 as a key
priority for MS and this is reflected by the fact that 18 MS are participating in this
WP.
In order to achieve this priority, it is important that we work with an expert with
digital marketing expertise, who is recognized as a credible European leader in this
field. Ireland and Portugal, Joint leaders of WP6, have needed to go outside their
own countries to find an expert at the cutting edge of digital media with such
expertise. We will identify one of the top experts with WHO and EU (Nordic
countries and Ireland) experience of at least 10 years in digital marketing field and
recruit them to participate in WP 6.
An EU WHO recognised subcontractor will work on tasks 6.4 and 6.5 and will support
the development and implementation of the monitoring protocols and support their
implementation in the broader EU context. Traditional media as well as digital
media will be addressed and media literacy of children evaluated where possible.
The subcontractor will support the development of the codes of practice in the
interested MS. The subcontractor will be subcontracted by one of the Irish Affiliated
Entities
ISS
Subcontracting in WP4 (1 subcontractor):
The subcontractor will contribute to identifying and analysing pertinent key EU processes
and tools, with additional focus on equity and sustainability. A subcontractor will facilitate
setting the objectives with the Member States representatives and EU stakeholders
participating to the Policy Dialogue events and will produce short policy briefs with Member
States based on Best-ReMaP JA outcomes, to inform the participating stakeholders of what
has been achieved up to date in order to build on, rather than replicate, existing work.
More detailed description of the task:
- Contribution to the drafting of the ‘Integration and sustainability plan’, with emphasis in
analysing pertinent key EU intersectoral processes and tools, relevant to nutrition, helping
undertake interviews and feed relevant information into the roadmap and the report.
- Conducting ongoing monitoring of the EU processes and timely inform JA Best-ReMaP on
relevant policy developments. Subcontractor will also help channel JA Best-ReMaP outputs
and learnings towards relevant EU-level initiatives and consultations, and, when possible,
similar activities at national-level.
- To carry out these activities, a wide and close monitoring of the key EU processes is
required. Institutions from Member States might not have the required knowledge to
identify the EU processes and tools and collect the relevant information, especially in the
present Covid-19 situation where policies at the EU level are rapidly changing and adapting,
giving far higher importance to public health as ever before.
- Supporting the stakeholder mapping activity in the following: identification of most
relevant stakeholders at the EU level, including non-traditional actors, that may be less
aware but who nevertheless work in sectors affecting health and nutrition; detailed
mapping to ensure the longevity and sustainability of the Action, as stakeholders will be able
to continue the collaboration and exchange information after the Action concludes;
Date: 09/07/2020 90 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
development of the matrix of influencers, according to the identified stakeholders level of
influence and level of interest.
- Supporting the establishment of a group of experts to assess the results of the analysis of
the relevant EU policies. An existing network of non-traditional, but key and relevant
stakeholders in the private sector and experts on the EU policies is required to perform the
above-mentioned activities.
- Production of short policy briefs with Member States based on Best-ReMaP JA outcomes,
to inform the participating stakeholders of what has been achieved up to date in order to
build on, rather than replicate, existing work.
- Implementation of the long-standing dissemination of the JA recommendations at the EU
and national levels, via recognized EU dissemination channels.
CDPC
Subcontracting in WP6 (1 subcontractor):
The Centre for Disease Prevention and Control (CDPC) of Latvia goals are to implement
national public health policy in the field of epidemiological safety and disease prevention,
to ensure the implementation and coordination of health promotion policies – according to
that there are not such professionals (for example, food technologist, marketing specialist,
researcher) in the staff of, so CDPC will have to involve freelancers from other institutions,
organizations.
For example, in Latvia, the organization that is responsible for transposition of the AVMSD
is the Ministry of Culture, so to make them interested in Best-ReMaP Project, Latvia will
involve a specialist from the Ministry of Culture, as well as the specialists of food
technologies and researchers will be involved from University of Agriculture of Latvia. They
will be involved in the JA through a legal subcontract, according to national law of public
procurement.
Date: 09/07/2020 91 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
10.2 Summary of Effort
Applicant No. Total
and Short Person
Name WP1 WP2 WP3 WP4 WP5 WP6 WP7 Months
1 NIJZ 103 9 5 13,5 17 23 67,25 237,75
2 BMASGK 1 1 1 1 / 9 10 23
2.1 AGES 0,5 0,5 0,5 0,5 17 / / 19
2.2 GOeG 0,5 0,5 0,5 0,5 / / 17,5 19,5
3 SCIENSANO 1 1 1 1 28 12 / 44
4 MCA 1 1 1 1 0,5 2 6 12,5
4.1 PHI-FBH 0,5 0,5 0,5 0,5 7 6 12 27
4.2 PHI-RS 0,5 0,5 0,5 0,5 7 6 12 27
5 NCPHA 1 1 1 1 14 3,5 6 27,5
6 CIPH 1 1 1 1 14 14 / 32
7 MoH CY 1 1 1 1 12 18 / 34
8 DVFA 1 1 1 1 12 / / 16
8.1 CPH-MUN 0,5 0,5 0,5 0,5 / / 30 32
9 MoSA 1 1 1 1 1 2 / 7
9.1 NIHD 0,5 0,5 0,5 0,5 22 2 / 26
10 THL 2 2 50 2 15 20 30 121
11 ANSES 2 2 2 2 96,5 11 / 115,5
11.1 SPF 0,5 0,5 0,5 0,5 / 8 / 10
11.2 MoH-FR 0,5 0,5 0,5 1 0,5 1 / 4
12 MRI 1 1 1 1 23 / / 27
13 ICH 1 1 1 1 17 20 24,5 65,5
14 SU 2 67 2 2 / / / 73
14.1 NIPN 0,5 4,5 0,5 0,5 19 / 30 55
15 DoH 2 2 2 2 1 11 / 20
15.1 FSAI 0,5 0,5 0,5 0,5 22 / / 24
15.2 CHDR 0,5 0,5 0,5 0,5 / 19 / 21
16 ISS 2 2 2 38 13 / / 57
17 CDPC 1 1 1 1 / 19 / 23
18 LR SAM 1 1 1 1 / 4 / 8
19 MFH 1 1 1 1 17 / 12 33
20 RIVM 1 1 1 1 7 / / 11
21 SUM 1 1 1 1 13 / 14 31
22 DGS 2 2 2 2 7 60,5 / 75,5
22.1 FCNAUP 0,5 0,5 0,5 0,5 7 2,5 / 11,5
23 NIPH 1 1 1 1 17 13 / 34
24 IPHS 1 1 1 1 / 5 / 9
Total Person 138 113 88 85 426,5 291,5 271,25 1.413,25
Months
Date: 09/07/2020 92 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
10.3 Third-Party Contributions
The Best-ReMaP JA does not foresee any third-party contributions.
10.4 Detailed Budget
Applicant No. & Short Name 01 NIJZ
(If affiliated entity: Affiliated to
which Applicant number/Short
name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 5.000,00 18 90.000,00
Researcher 4.100,00 9 36.900,00
Project manager 3.200,00 12 38.400,00
Communication officer 3.100,00 9 27.900,00
Legal officer 2.500,00 12 30.000,00
Financial officer 2.500,00 36 90.000,00
Secretariat 2.200,00 36 79.200,00
Junior researcher 2.000,00 16,75 33.500,00
Junior researcher 2.000,00 23 46.000,00
Junior researcher 2.000,00 21 42.000,00
Junior researcher 2.000,00 9 18.000,00
Junior researcher 2.000,00 36 72.000,00
Total person Total Costs (€)
month for (A)
237,75 603.900,00
Justification
Person-month per WP (237,75 PM):
WP1: 103 PM, WP2: 9 PM, WP3: 5 PM, WP4: 13,5 PM, WP5:
17 PM, WP6: 23 PM, WP7: 67,25 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
140.000,00 Subcontract with external experts for work on
WP7
External expertise on public procurement is
needed by WP 7 for achievement of all tasks.
The external expertise will allow for adequate
knowledge transfer, development of training
materials, implementation of Pilot Catalogue of
foods and joint public tender. Expertise on
public procurement of food is essential in order
for the JA to build upon existing knowledge and
outputs.
Food procurement good practices in public
institutions are developed and implemented in
direct contacts with individual entities in
private sector.
Public health institutions are not participating
in development and implementation of such
good practices as they might be exposed to
possible conflicts of interests.
For that reason, best practice in the field will be
selected for subcontracting, bringing in the
Date: 09/07/2020 93 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
knowledge and expertise of engagement with
private sector at the umbrella level, while
taking control over the possible conflicts of
interest.
20.000,00 Stakeholder analysis upgrade
A subcontractor will contribute to identifying
the groups of relevant stakeholders at EU and
national levels, especially in food procurement
area, exploring its network and subsequently
identifying their level of influence and level of
interest.
10.000,00 Inequalities
Specific expertise on health equity in complex
obesogenic food environment, relevant for
food reformulation, and especially for food
(digital) marketing and public procurements of
foods will be delivered to support JA Best-
ReMaP foreseen policy recommendations,
providing proportional universalism in those
recommendations and thus leaving no-one
behind.
Total Costs (€) of (B) 170.000,00
(C) Other direct costs
(C.1) Travel Costs (€) Justification
6.588,00 WP1: Policy decision making forum (3
meetings; 1 day; 3 persons).
7.552,00 WP1: 2nd GA + 3th SC (2 days; 8 persons).
7.680,00 WP1: 3rd GA + 5th SC (2 days; 8 persons).
2.816,00 WP1: 6th SC (1 day; 4 persons).
4.000,00 WP1: Final Conference + 4th GA + 7th SC (2
days; 8 persons).
8.920,00 WP1: 1st Conference reimbursement (5
persons).
12.000,00 WP1: Reimbursement for external experts
for SC meetings (3-4 persons).
245,00 WP2: Final meeting (0,5 day; 2 persons).
10.000,00 WP2: Dissemination of the Coordination of
JA.
888,00 WP3: 1st Working group meeting with
external evaluators (2 days; 2 persons).
1.976,00 WP3: 2nd Working group meeting with
external evaluators (2 days; 2 persons).
245,00 WP3: Final meeting (0,5 day; 2 persons).
960,00 WP4: Policy dialogue with Member States
stakeholders (Mediterranean and Balkan
Region) (2 days; 1 person).
950,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 1 person).
988,00 WP4: Policy dialogue with Member States
stakeholders (Scandinavian and Eastern
European Region) (2 days; 1 person).
464,00 WP4: Policy dialogue with EU stakeholders
(2 days; 1 person).
Date: 09/07/2020 94 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
245,00 WP4: Final meeting (0,5 day; 2 persons).
348,00 WP5: 2nd meeting (0,5 day; 3 persons).
366,00 WP5: 3rd meeting (0,5 day; 3 persons).
345,00 WP5: 5th meeting (0,5 day; 3 persons).
690,00 WP5: Training second snapshot (1 day; 3
persons).
690,00 WP5: Training (1 day; 3 persons).
735,00 WP5: Final workshop (1 day; 3 persons).
1.816,00 WP6: Workshop to support MS in the
transposition of AVMSD (1 day; 2 persons).
2.016,00 WP6: Meeting 1 of the EU oversight WG (2
days; 2 persons).
1.408,00 WP6: Meeting 2 of the EU oversight WG (1
day; 2 persons).
1.464,00 WP6: Meeting 3 of the EU oversight WG (1
day; 2 persons).
1.952,00 WP6: Meeting 4 of the EU oversight WG (2
days; 2 persons).
1.976,00 WP6: Workshop regarding the EU-wide
harmonised and comprehensive monitoring
protocol (2 days; 2 persons).
245,00 WP6: Final meeting (0,5 day; 2 persons).
17.128,00 WP7: National meeting (9 meetings; 2 days;
2 persons).
3.345,00 WP7: 1st meeting (3 days; 3 persons).
2.700,00 WP7: 3rd meeting (2 days; 3 persons).
2.215,00 WP7: Reimbursement for external
procurement officer (2 meetings; 3 days; 1
person).
(C.2) Equipment Costs (€) Justification
5.250,00 Laptop computer (4x)
Monitor (5x)
(C.3) Other goods and services Costs (€) Justification
12.554,77 Promotional material (1 roll-up; badges,
pens, folders, notebooks, tote bags…-1000
units/each).
12.500,00 Organisation of 1st Conference (200
participants) and 4th SC (20 participants) in
Ljubljana (venue and catering).
4.500,00 Organisation of 3 Policy decision making
forums in Brussels (25 participants/meeting;
catering).
26.226,00 Rental of 4PM financial project management
software (support and modification;
728,50€/month).
3.000,00 Conference registration fees
(500€/conference).
1.000,00 Organisation of 2 Local stakeholder events
in Ljubljana (50 participants/meeting;
catering).
200,00 Organisation of Policy decision makers local
event in Ljubljana (20 participants; catering).
Date: 09/07/2020 95 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
500,00 Organisation of WP7 inter-sectoral group
meeting in Ljubljana (25 participants; venue
and catering).
1.500,00 Organisation of WP7 national meeting (30
participants; venue and catering).
2.000,00 Organisation of WP7 2nd meeting (25
participants; venue and catering).
1.000,00 Translation of training material (WP7; 35
pages).
5.000,00 Purchase of food groups (WP5).
6.000,00 Audit.
Total Costs (€) of (C) 187.186,77
(D) Indirect Costs Total Costs
(€)
(Max. 7% on A, B and C) 67.276,07
Total estimated eligible costs 1.028.362,84
Applicant No. & Short Name 02 BMASGK
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 7.597,23 5 37.986,15
Researcher 6.226,68 8 49.813,44
Researcher 6.226,68 10 62.266,80
Total person Total Costs (€)
month for (A)
23 150.066,39
Justification
Person-month per WP (23 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP6: 9 PM,
WP7: 10 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
15.000,00 External expertise in Task 7.2
External expertise is required in order for
Austria to participate in the joint public tender
which is key to the implementation of Tasks 7.2
and 7.3.
Total Costs (€) of (B) 15.000,00
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
Date: 09/07/2020 96 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
20,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders
(2 days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
718,50 WP6: Kick-off meeting (0,5 day; 1 person).
1.008,00 WP6: Meeting 1 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Meeting 2 of the EU oversight WG (1
day; 1 person).
732,00 WP6: Meeting 3 of the EU oversight WG (1
day; 1 person).
976,00 WP6: Meeting 4 of the EU oversight WG (2
days; 1 person).
1.008,00 WP6: Workshop regarding guidance for
codes of practices (2 days; 1 person).
622,50 WP6: Final meeting (0,5 day; 1 person).
118,50 WP7: Kick-off meeting (0,5 day; 1 person).
20,00 WP7: Inter-sectoral group meeting (1 day; 1
person).
20,00 WP7: National meeting (2 days; 1 person).
1.115,00 WP7: 1st meeting (3 days; 1 person).
680,00 WP7: 2nd meeting (1 day; 1 person).
1.040,00 WP7: Workshop (3 days; 1 person).
900,00 WP7: 3rd meeting (2 days; 1 person).
2.215,00 WP7: Reimbursement for external
procurement officer (2 meetings; 3 days; 1
person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and Costs (€) Justification
services
2.000,00 Organisation of WP7 inter-sectoral group
meeting (30 participants; venue and
catering).
2.000,00 Organisation of WP7 national meeting (50
participants; venue and catering).
1.000,00 Translation of training material (WP7; 35
pages).
Total Costs (€) of (C) 23.412,50
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 13.193,52
Total estimated eligible costs 201.672,41
Applicant No. & Short Name AGES
Date: 09/07/2020 97 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(If affiliated entity: Affiliated 02 BMASGK
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 8.140,00 5 40.700,00
Researcher 6.120,00 7 42.840,00
Junior researcher 4.120,00 7 28.840,00
Total person Total Costs (€)
month for (A)
19 112.380,00
Justification
Person-month per WP (19 PM):
WP1: 0,5 PM, WP2: 0,5 PM, WP3: 0,5 PM, WP4: 0,5 PM, WP5:
17 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1
day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
20,00 WP4: Policy decision makers local event (0,5
day; 1 person).
20,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
837,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
237,00 WP5: Training data analyses (1 day; 1
person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
172,00 WP5: 3rd meeting (0,5 day; 1 person).
590,00 WP5: 4th meeting (0,5 day; 1 person).
615,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training second snapshot (1 day; 1
person).
Date: 09/07/2020 98 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
230,00 WP5: Training (1 day; 1 person).
745,00 WP5: Final workshop (1 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organization of Policy dialogue with
Member States stakeholders (Middle
European Region) (30 participants; venue
and catering).
2.000,00 Organisation of 2 Local stakeholder events
(50 participants/meeting; venue and
catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
Total Costs (€) of (C) 19.103,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 9.203,81
Total estimated eligible costs 140.686,81
Applicant No. & Short Name GOeG
(If affiliated entity: Affiliated 02 BMASGK
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Expert 8.499,72 2 16.999,44
Researcher 6.866,57 7 48.065,99
Researcher 5.931,43 10,5 62.280,02
Total person Total Costs (€)
month for (A)
19,5 127.345,45
Justification
Person-month per WP (19,5 PM):
WP1: 0,5 PM, WP2: 0,5 PM, WP3: 0,5 PM, WP4: 0,5 PM, WP7:
17,5 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
Date: 09/07/2020 99 / 151 Doc. Version: <v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
20,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
Total Costs (€) of (C) 5.571,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 9.304,15
Total estimated eligible costs 142.220,60
Applicant No. & Short Name 03 SCIENSANO
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 8.663,32 30 259.899,60
Researcher 6.632,32 14 92.852,48
Total person Total Costs (€)
month for (A)
44 352.752,08
Justification
Person-month per WP (44 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP5: 28 PM,
WP6: 12 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
40,00 WP2: Local stakeholder event (2 events; 1
day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
Date: 09/07/2020 100 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
950,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 1 person).
20,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
20,00 WP5: 2nd meeting (0,5 day; 1 person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training second snapshot (1 day; 1
person).
230,00 WP5: Training (1 day; 1 person).
245,00 WP5: Final workshop (1 day; 1 person).
1.008,00 WP6: Meeting 1 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Meeting 2 of the EU oversight WG (1
day; 1 person).
20,00 WP6: Meeting 3 of the EU oversight WG (1
day; 1 person).
976,00 WP6: Meeting 4 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Workshop to support MS in the
transposition of AVMSD (1 day; 1 person).
988,00 WP6: Workshop regarding the EU-wide
harmonised and comprehensive monitoring
protocol (2 days; 1 person).
1.008,00 WP6: Workshop regarding guidance for
codes of practices (2 days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
5.759,00 Reimbursement for travel to meetings for
WP1, WP2, WP3 and WP4 for FOD Health Ms
Laurence Doughan
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
1.000,00 Organisation of 2 Local stakeholder events
(50 participants/meeting; venue and
catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
500,00 Organisation of 2nd WP5 meeting (30
participants; venue and catering).
2.000,00 Purchase of food groups (WP5).
522,00 Organisation of Meeting 3 of the EU
oversight WG (24 participants; venue and
catering).
10.000,00 Licence to use GS1.
20.000,00 Licence for the Euremo web application.
6.000,00 Audit.
Total Costs (€) of (C) 57.695,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 28.731,30
Date: 09/07/2020 101 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Total estimated eligible costs 439.178,38
Applicant No. & Short Name 04 MCA
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 1.973,00 4,5 8.878,50
Researcher 1.479,00 6 8.874,00
Junior researcher 1.232,00 1 1.232,00
Junior researcher 1.040,00 1 1.040,00
Total person Total Costs (€)
month for (A)
12,5 20.024,50
Justification
Person-month per WP (12,5 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP5: 0,5
PM, WP6: 2 PM, WP7: 6 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
460,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
40,00 WP2: Local stakeholder event (2 events; 1
day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
20,00 WP4: Policy decision makers local event (0,5
day; 1 person).
960,00 WP4: Policy dialogue with Member States
stakeholders (Mediterranean and Balkan
Region) (2 days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
500,00 WP5: 2nd meeting (0,5 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
1.008,00 WP6: Meeting 1 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Meeting 2 of the EU oversight WG (1
day; 1 person).
Date: 09/07/2020 102 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
732,00 WP6: Meeting 3 of the EU oversight WG (1
day; 1 person).
976,00 WP6: Meeting 4 of the EU oversight WG (2
days; 1 person).
988,00 WP6: Workshop regarding the EU-wide
harmonised and comprehensive monitoring
protocol (2 days; 1 person).
1.008,00 WP6: Workshop regarding guidance for
codes of practices (2 days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
118,50 WP7: Kick-off meeting (0,5 day; 1 person).
20,00 WP7: Inter-sectoral group meeting (1 day; 1
person).
20,00 WP7: National meeting (2 days; 1 person).
1.115,00 WP7: 1st meeting (3 days; 1 person).
180,00 WP7: 2nd meeting (1 day; 1 person).
640,00 WP7: Workshop (3 days; 1 person).
1.175,00 WP7: Reimbursement for external
procurement officer (2 meetings; 3 days; 1
person).
(C.2) Equipment Costs (€) Justification
210,00 Notebook
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organisation of 2 Local stakeholder events
(50 participants/meeting; venue and
catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
2.000,00 Organisation of WP7 inter-sectoral group
meeting (25 participants; venue and
catering).
2.000,00 Organisation of WP7 national meeting (30
participants; venue and catering).
2.000,00 Organisation of WP7 3rd meeting (25
participants; venue and catering).
1.000,00 Translation of training material (WP7; 35
pages).
Total Costs (€) of (C) 30.370,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 3.527,62
Total estimated eligible costs 53.922,12
Applicant No. & Short Name PHI-FBH
(If affiliated entity: Affiliated 04 MCA
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 1.783,00 20 35.660,00
Date: 09/07/2020 103 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Researcher 1.500,00 7 10.500,00
Total person Total Costs (€)
month for (A)
27 46.160,00
Justification
Person-month per WP (27 PM):
WP1: 0,5 PM, WP2: 0,5 PM, WP3: 0,5 PM, WP4: 0,5 PM, WP5:
7 PM, WP6: 6 PM, WP7: 12 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
460,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
960,00 WP4: Policy dialogue with Member States
stakeholders (Mediterranean and Balkan
Region) (2 days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
232,00 WP5: Training first snapshot (1 day; 1
person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
180,00 WP5: Training (1 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
245,00 WP5: Final workshop (1 day; 1 person).
118,50 WP7: Kick-off meeting (0,5 day; 1 person).
20,00 WP7: Inter-sectoral group meeting (1 day; 1
person).
20,00 WP7: National meeting (2 days; 1 person).
1.115,00 WP7: 1st meeting (3 days; 1 person).
180,00 WP7: 2nd meeting (1 day; 1 person).
640,00 WP7: Workshop (3 days; 1 person).
(C.2) Equipment Costs (€) Justification
478,00 Notebook
(C.3) Other goods and services Costs (€) Justification
Total Costs (€) of (C) 10.519,50
Date: 09/07/2020 104 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 3.967,57
Total estimated eligible costs 60.647,07
Applicant No. & Short Name PHI-RS
(If affiliated entity: Affiliated 04 MCA
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 1.587,00 20 31.740,00
Researcher 1.500,00 7 10.500,00
Total person Total Costs (€)
month for (A)
27 42.240,00
Justification
Person-month per WP (27 PM):
WP1: 0,5 PM, WP2: 0,5 PM, WP3: 0,5 PM, WP4: 0,5 PM, WP5:
7 PM, WP6: 6 PM, WP7: 12 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
460,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
960,00 WP4: Policy dialogue with Member States
stakeholders (Mediterranean and Balkan
Region) (2 days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
232,00 WP5: Training first snapshot (1 day; 1
person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
Date: 09/07/2020 105 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
180,00 WP5: Training (1 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
245,00 WP5: Final workshop (1 day; 1 person).
118,50 WP7: Kick-off meeting (0,5 day; 1 person).
20,00 WP7: Inter-sectoral group meeting (1 day; 1
person).
20,00 WP7: National meeting (2 days; 1 person).
1.115,00 WP7: 1st meeting (3 days; 1 person).
180,00 WP7: 2nd meeting (1 day; 1 person).
640,00 WP7: Workshop (3 days; 1 person).
(C.2) Equipment Costs (€) Justification
478,00 Notebook
(C.3) Other goods and services Costs (€) Justification
Total Costs (€) of (C) 10.519,50
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 3.693,17
Total estimated eligible costs 56.452,67
Applicant No. & Short Name 05 NCPHA
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 1.221,69 9,25 11.300,63
Senior researcher 1.221,69 9 10.995,21
Researcher 910,81 2,5 2.277,02
Researcher 910,81 1,5 1.366,21
Researcher 910,81 1,5 1.366,21
Researcher 910,81 1,5 1.366,21
Researcher 902,06 1,25 1.127,57
Junior researcher 845,63 1 845,63
Total person Total Costs (€)
month for (A)
27,5 30.644,69
Justification
Person-month per WP (27,5 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP5: 14 PM,
WP6: 3,5 PM, WP7: 6 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
Date: 09/07/2020 106 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1
day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
988,00 WP4: Policy dialogue with Member States
stakeholders (Scandinavian and Eastern
European Region) (2 days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
232,00 WP5: Training first snapshot (1 day; 1
person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
180,00 WP5: Training (1 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training second snapshot (1 day; 1
person).
245,00 WP5: Final workshop (1 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
1.008,00 WP6: Meeting 1 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Meeting 2 of the EU oversight WG (1
day; 1 person).
732,00 WP6: Meeting 3 of the EU oversight WG (1
day; 1 person).
976,00 WP6: Meeting 4 of the EU oversight WG (2
days; 1 person).
988,00 WP6: Workshop regarding the EU-wide
harmonised and comprehensive monitoring
protocol (2 days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
118,50 WP7: Kick-off meeting (0,5 day; 1 person).
20,00 WP7: Inter-sectoral group meeting (1 day; 1
person).
20,00 WP7: National meeting (2 days; 1 person).
1.115,00 WP7: 1st meeting (3 days; 1 person).
180,00 WP7: 2nd meeting (1 day; 1 person).
1.040,00 WP7: Workshop (3 days; 1 person).
900,00 WP7: 3rd meeting (2 days; 1 person).
2.215,00 WP7: Reimbursement for external
procurement officer (2 meetings; 3 days; 1
person).
Date: 09/07/2020 107 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organisation of 2 Local stakeholder events
(50 participants/meeting; venue and
catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
2.000,00 Organisation of WP7 inter-sectoral group
meeting (25 participants; venue and
catering).
2.000,00 Organisation of WP7 national meeting (30
participants; venue and catering).
1.000,00 Translation of training material (WP7; 35
pages).
Total Costs (€) of (C) 32.067,50
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 4.389,85
Total estimated eligible costs 67.102,04
Applicant No. & Short Name 06 CIPH
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 3.378,05 7 23.646,33
Researcher 1.912,76 17 32.516,94
Junior researcher 1.551,32 7 10.859,21
Junior researcher 1.487,87 1 1.487,87
Total person Total Costs (€)
month for (A)
32 68.510,34
Justification
Person-month per WP (32 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP5: 14 PM,
WP6: 14 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
460,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
Date: 09/07/2020 108 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
718,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1
day; 1 person).
622,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
960,00 WP4: Policy dialogue with Member States
stakeholders (Mediterranean and Balkan
Region) (2 days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
837,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
232,00 WP5: Training first snapshot (1 day; 1
person).
622,00 WP5: 3rd meeting (0,5 day; 1 person).
190,00 WP5: 4th meeting (0,5 day; 1 person).
180,00 WP5: Training (1 day; 1 person).
615,00 WP5: 5th meeting (0,5 day; 1 person).
745,00 WP5: Final workshop (1 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
704,00 WP6: Workshop to support MS in the
transposition of AVMSD (2 days; 1 person).
988,00 WP6: Workshop regarding the EU-wide
harmonised and comprehensive monitoring
protocol (2 days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organisation of 2 Local stakeholder events
(50 participants/meeting; venue and
catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
Total Costs (€) of (C) 21.385,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 6.292,67
Total estimated eligible costs 96.188,01
Applicant No. & Short Name 07 MoH CY
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Date: 09/07/2020 109 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 3.000,00 6 18.000,00
Researcher 2.000,00 28 56.000,00
Total person Total Costs (€)
month for (A)
34 74.000,00
Justification
Person-month per WP (34 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP5: 12 PM,
WP6: 18 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.174,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
1.144,00 WP1: 2nd GA (2 days; 1 person).
1.060,00 WP1: 1st Conference (2 days; 1 person).
1.160,00 WP1: 3rd GA (2 days; 1 person).
1.190,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1
day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
20,00 WP4: Policy decision makers local event (0,5
day; 1 person).
1.160,00 WP4: Policy dialogue with Member States
stakeholders (Mediterranean and Balkan
Region) (2 days; 1 person).
1.164,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
816,00 WP5: 2nd meeting (0,5 day; 1 person).
232,00 WP5: Training first snapshot (1 day; 1
person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
180,00 WP5: Training (1 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training (1 day; 1 person).
945,00 WP5: Final workshop (1 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
Date: 09/07/2020 110 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1.208,00 WP6: Meeting 1 of the EU oversight WG (2
days; 1 person).
904,00 WP6: Meeting 2 of the EU oversight WG (1
day; 1 person).
932,00 WP6: Meeting 3 of the EU oversight WG (1
day; 1 person).
20,00 WP6: Meeting 4 of the EU oversight WG (2
days; 1 person).
904,00 WP6: Workshop to support MS in the
transposition of AVMSD (2 days; 1 person).
1.188,00 WP6: Workshop regarding the EU-wide
harmonised and comprehensive monitoring
protocol (2 days; 1 person).
1.208,00 WP6: Workshop regarding guidance for
codes of practices (2 days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organisation of 2 Local stakeholder events
(50 participants/meeting; venue and
catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
2.000,00 Organisation of Meeting 4 of the EU
oversight WG (24 participants; venue and
catering).
Total Costs (€) of (C) 27.607,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 7.112,49
Total estimated eligible costs 108.719,49
Applicant No. & Short Name 08 DVFA
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 9.174,15 2,25 20.641,83
Financial Project Officer 9.174,15 0,5 4.587,08
Researcher 8.047,50 13,25 106.629,38
Total person Total Costs (€)
month for (A)
16 131.858,29
Justification
Person-month per WP (16 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP5: 12 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Date: 09/07/2020 111 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1
day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
988,00 WP4: Policy dialogue with Member States
stakeholders (Scandinavian and Eastern
European Region) (2 days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training second snapshot (1 day; 1
person).
245,00 WP5: Final workshop (1 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organisation of 2 Local stakeholder events
(50 participants/meeting; venue and
catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
Total Costs (€) of (C) 16.398,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 10.377,94
Total estimated eligible costs 158.634,23
Applicant No. & Short Name CPH-MUN
Date: 09/07/2020 112 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(If affiliated entity: Affiliated 08 DVFA
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 9.174,15 9 82.567,35
Financial Project Officer 9.174,15 0,25 2.293,54
Researcher 8.047,50 22,75 183.080,62
Total person Total Costs (€)
month for (A)
32 267.941,51
Justification
Person-month per WP (32 PM):
WP1: 0,5 PM, WP2: 0,5 PM, WP3: 0,5 PM, WP4: 0,5 PM, WP7:
30 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
122,50 WP2: Final meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
988,00 WP4: Policy dialogue with Member States
stakeholders (Scandinavian and Eastern
European Region) (2 days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
40,00 WP7: Inter-sectoral group meeting (1 day; 2
persons).
8.384,00 WP7: National meeting (9 meetings; 2 days;
1 person).
1.115,00 WP7: 1st meeting (3 days; 1 person).
180,00 WP7: 2nd meeting (1 day; 1 person).
1.040,00 WP7: Workshop (3 days; 1 person).
900,00 WP7: 3rd meeting (2 days; 1 person).
2.215,00 WP7: Reimbursement for external
procurement officer (2 meetings; 3 days; 1
person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
1.306,50 Organisation of WP7 inter-sectoral group
meeting (25 participants; venue and
catering).
2.000,00 Organisation of WP7 national meeting (30
participants; venue and catering).
Date: 09/07/2020 113 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1.000,00 Translation of training material (WP7; 35
pages).
3.000,00 Audit.
Total Costs (€) of (C) 26.290,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 20.596,21
Total estimated eligible costs 314.827,72
Applicant No. & Short Name 09 MoSA
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 2.676,00 7 18.732,00
Total person Total Costs (€)
month for (A)
7 18.732,00
Justification
Person-month per WP (7 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP5: 1 PM,
WP6: 2 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1
day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
588,00 WP4: Policy dialogue with Member States
stakeholders (Scandinavian and Eastern
European Region) (2 days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
Date: 09/07/2020 114 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
237,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
237,00 WP5: Training data analyses (1 day; 1
person).
500,00 WP5: 2nd meeting (0,5 day; 1 person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training second snapshot (1 day; 1
person).
230,00 WP5: Training (1 day; 1 person).
245,00 WP5: Final workshop (1 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
1.008,00 WP6: Meeting 1 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Meeting 2 of the EU oversight WG (1
day; 1 person).
732,00 WP6: Meeting 3 of the EU oversight WG (1
day; 1 person).
976,00 WP6: Meeting 4 of the EU oversight WG (2
days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organisation of 2 Local stakeholder events
(40 participants/meeting; venue and
catering).
200,00 Organisation of Policy decision makers local
event (10 participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
Total Costs (€) of (C) 20.010,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 2.711,94
Total estimated eligible costs 41.453,94
Applicant No. & Short Name NIHD
(If affiliated entity: Affiliated 09 MoSA
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 2.435,00 14 34.090,00
Researcher 2.007,00 5 10.035,00
Researcher 1.873,00 7 13.111,00
Total person Total Costs (€)
month for (A)
26 57.236,00
Justification
Person-month per WP (26 PM):
Date: 09/07/2020 115 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
WP1: 0,5 PM, WP2: 0,5 PM, WP3: 0,5 PM, WP4: 0,5 PM, WP5:
22 PM, WP6: 2 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
588,00 WP4: Policy dialogue with Member States
stakeholders (Scandinavian and Eastern
European Region) (2 days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
237,00 WP5: Training data analyses (1 day; 1
person).
500,00 WP5: 2nd meeting (0,5 day; 1 person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training second snapshot (1 day; 1
person).
230,00 WP5: Training (1 day; 1 person).
245,00 WP5: Final workshop (1 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
704,00 WP6: Workshop to support MS in the
transposition of AVMSD (2 days; 1 person).
1.008,00 WP6: Workshop regarding guidance for
codes of practices (2 days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
Total Costs (€) of (C) 10.098,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 4.713,38
Total estimated eligible costs 72.047,38
Date: 09/07/2020 116 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Applicant No. & Short Name 10 THL
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 9.964,84 5 49.824,20
Researcher 6.531,24 36 235.124,64
Researcher 5.920,00 26 153.920,00
Researcher 5.920,00 23 136.160,00
Researcher 5.920,00 11 65.120,00
Researcher 5.920,00 4 23.680,00
Junior researcher 4.297,72 12 51.572,64
Junior researcher 4.144,00 4 16.576,00
Total person Total Costs (€)
month for (A)
121 731.977,48
Justification
Person-month per WP (121 PM):
WP1: 2 PM, WP2: 2 PM, WP3: 50 PM, WP4: 2 PM, WP5: 15
PM, WP6: 20 PM, WP7: 30 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
20.000,00 External evaluators for tasks in WP 3
External evaluation will be key to all the tasks
within WP 3. Selected external evaluators will
support the evaluation strategy and its
implementation, through key checks of the
interim and final evaluation reports.
Total Costs (€) of (B) 20.000,00
(C) Other direct costs
(C.1) Travel Costs (€) Justification
2.196,00 WP1: Policy decision making forum (3
meetings; 1 day; 1 person).
944,00 WP1: 2nd GA + 3th SC (2 days; 1 person).
860,00 WP1: 1st Conference + 4th SC (2 days; 1
person).
960,00 WP1: 3rd GA + 5th SC (2 days; 1 person).
704,00 WP1: 6th SC (1 day; 1 person).
990,00 WP1: Final Conference + 4th GA + 7th SC (2
days; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1
day; 1 person).
122,5,00 WP2: Final meeting (0,5 day; 1 person).
444,00 WP3: 1st Working group meeting with
external evaluators (2 days; 1 person).
20,00 WP3: 2nd Working group meeting with
external evaluators (2 days; 1 person).
245,00 WP3: Final meeting (0,5 day; 1 person).
Date: 09/07/2020 117 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
20,00 WP4: Policy dialogue with Member States
stakeholders (Scandinavian and Eastern
European Region) (2 days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
622,50 WP4: Final meeting (0,5 day; 1 person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
232,00 WP5: Training first snapshot (1 day; 1
person).
622,00 WP5: 3rd meeting (0,5 day; 1 person).
590,00 WP5: 4th meeting (0,5 day; 1 person).
180,00 WP5: Training (1 day; 1 person).
615,00 WP5: 5th meeting (0,5 day; 1 person).
745,00 WP5: Final workshop (1 day; 1 person).
1.008,00 WP6: Meeting 1 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Meeting 2 of the EU oversight WG (1
day; 1 person).
732,00 WP6: Meeting 3 of the EU oversight WG (1
day; 1 person).
976,00 WP6: Meeting 4 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Workshop to support MS in the
transposition of AVMSD (1 day; 1 person).
20,00 WP6: Workshop regarding the EU-wide
harmonised and comprehensive monitoring
protocol (2 days; 1 person).
1.008,00 WP6: Workshop regarding guidance for
codes of practices (2 days; 1 person).
622,50 WP6: Final meeting (0,5 day; 1 person).
20,00 WP7: Inter-sectoral group meeting (2 days; 1
person).
20,00 WP7: National meeting (2 days; 1 person).
1.115,00 WP7: 1st meeting (3 days; 1 person).
680,00 WP7: 2nd meeting (1 day; 1 person).
1.040,00 WP7: Workshop (3 days; 1 person).
900,00 WP7: 3rd meeting (2 days; 1 person).
2.215,00 WP7: Reimbursement for external
procurement officer (2 meetings; 3 days; 1
person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organisation of 2 Local stakeholder events
(50 participants/meeting; venue and
catering).
3.000,00 License fee for software for web surveys.
1.500,00 Organisation of 1st Working group meeting
with external evaluators (6 participants;
venue and catering).
1.500,00 Organisation of 2nd Working group meeting
with external evaluators (6 participants;
venue and catering).
Date: 09/07/2020 118 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
2.000,00 Organisation of Policy dialogue with
Member States stakeholders (Scandinavian
and Eastern European Region) (30
participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
2.000,00 Organisation of Workshop regarding the EU-
wide harmonised and comprehensive
monitoring protocol (24 participants; venue
and catering).
1.000,00 Organisation of WP7 inter-sectoral group
meeting (25 participants; venue and
catering).
1.940,50 Organisation of WP7 national meeting (30
participants; venue and catering).
1.000,00 Translation of training material (WP7; 35
pages).
6.000,00 Audit.
Total Costs (€) of (C) 51.514,50
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 56.244,44
Total estimated eligible costs 859.736,42
Applicant No. & Short Name 11 ANSES
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 11.330,22 2 22.660,44
Senior researcher 11.330,22 1,5 16.995,33
Senior researcher 7.475,00 10,5 78.487,50
Researcher 6.890,00 3,5 24.115,00
Researcher 6.820,00 3 20.460,00
Researcher 6.405,00 4 25.620,00
Researcher 4.600,00 36 165.600,00
Researcher 4.600,00 15 69.000,00
Junior researcher 3.900,00 4 15.600,00
Junior researcher 3.500,00 36 126.000,00
Total person Total Costs (€)
month for (A)
115,5 564.538,26
Justification
Person-month per WP (115,5 PM):
WP1: 2 PM, WP2: 2 PM, WP3: 2 PM, WP4: 2 PM, WP5: 96,5
PM, WP6: 11 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Date: 09/07/2020 119 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
2.196,00 WP1: Policy decision making forum (3
meetings; 1 day; 1 person).
944,00 WP1: 2nd GA + 3th SC (2 days; 1 person).
860,00 WP1: 1st Conference + 4th SC (2 days; 1
person).
960,00 WP1: 3rd GA + 5th SC (2 days; 1 person).
704,00 WP1: 6th SC (1 day; 1 person).
40,00 WP1: Final Conference + 4th GA + 7th SC (2
days; 2 persons).
40,00 WP2: Local stakeholder event (2 events; 1
day; 1 person).
20,00 WP2: Final meeting (0,5 day; 1 person).
1.900,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 2 persons).
464,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
40,00 WP4: Final meeting (0,5 day; 2 persons).
732,00 WP5: 2nd meeting (0,5 day; 2 persons).
464,00 WP5: Training first snapshot (1 day; 2
persons).
744,00 WP5: 3rd meeting (0,5 day; 2 persons).
488,00 WP5: Training second snapshot (1 day; 2
persons).
680,00 WP5: 4th meeting (0,5 day; 2 persons).
360,00 WP5: Training (1 day; 2 persons).
730,00 WP5: 5th meeting (0,5 day; 2 persons).
460,00 WP5: Training second snapshot (1 day; 2
persons).
460,00 WP5: Training (1 day; 2 persons).
40,00 WP5: Final workshop (1 day; 2 persons).
704,00 WP6: Workshop to support MS in the
transposition of AVMSD (1 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
6.388,50 Organisation of WP5 Final workshop (150
participants; venue and catering).
6.000,00 Audit.
Total Costs (€) of (C) 26.418,50
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 41.366,97
Total estimated eligible costs 632.323,73
Applicant No. & Short Name SPF
Date: 09/07/2020 120 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(If affiliated entity: Affiliated 11 ANSES
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 7.793,00 2,5 19.482,50
Senior researcher 6.694,00 3 20.082,00
Researcher 4.300,00 4,5 19.350,00
Total person Total Costs (€)
month for (A)
10,00 58.914,50
Justification
Person-month per WP (10 PM):
WP1: 0,5 PM, WP2: 0,5 PM, WP3: 0,5 PM, WP4: 0,5 PM, WP6:
8 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
20,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
20,00 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
950,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 1 person).
20,00 WP4: Final meeting (0,5 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
704,00 WP6: Workshop to support MS in the
transposition of AVMSD (2 days; 1 person).
40,00 WP6: Final meeting (0,5 day; 2 persons).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
Total Costs (€) of (C) 6.066,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 4.548,64
Total estimated eligible costs 69.529,14
Date: 09/07/2020 121 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Applicant No. & Short Name MoH-FR
(If affiliated entity: Affiliated to 11 ANSES
which Applicant number/Short
name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
International/EU affairs advisor 8.000,00 0,5 4.000,00
International affairs advisor 8.000,00 1 8.000,00
Head of MAEI 8.000,00 1 8.000,00
EA Nutrition expert 8.000,00 1,5 12.000,00
Total person Total Costs (€)
month for (A)
4 32.000,00
Justification
Person-month per WP (4 PM):
WP1: 0,5 PM, WP2: 0,5 PM, WP3: 0,5 PM, WP4: 1 PM, WP5:
0,5 PM, WP6: 1 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
40.000,00 Organisation of Final Conference (250
participants), 4th GA (50 participants) and 7th
SC (20 participants) in Paris (venue and
catering).
Total Costs (€) of (B) 40.000,00
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
20,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
20,00 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
950,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 1 person).
20,00 WP4: Final meeting (0,5 day; 1 person).
837,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
237,00 WP5: Training data analyses (1 day; 1
person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
232,00 WP5: Training first snapshot (1 day; 1
person).
622,00 WP5: 3rd meeting (0,5 day; 1 person).
244,00 WP5: Training second snapshot (1 day; 1
person).
Date: 09/07/2020 122 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
590,00 WP5: 4th meeting (0,5 day; 1 person).
180,00 WP5: Training (1 day; 1 person).
615,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training second snapshot (1 day; 1
person).
230,00 WP5: Training (1 day; 1 person).
20,00 WP5: Final workshop (1 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
704,00 WP6: Workshop to support MS in the
transposition of AVMSD (2 days; 1 person).
20,00 WP6: Final meeting (0,5 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
3.000,00 Organisation of individual WP Final meetings
(WP2, WP3, WP4 - 36 participants, WP6 - 22
participants; venue and catering).
2.000,00 Organisation of 2 Local stakeholder events
(50 participants/meeting; venue and
catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
Total Costs (€) of (C) 15.899,00
(D) Indirect Costs Total Costs
(€)
(Max. 7% on A, B and C) 6.152,93
Total estimated eligible costs 94.051,93
Applicant No. & Short Name 12 MRI
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 5.546,00 8 44.368,00
Researcher 3.245,00 19 61.655,00
Total person Total Costs (€)
month for (A)
27 106.023,00
Justification
Person-month per WP (27 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP5: 23 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
Date: 09/07/2020 123 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(C) Other direct costs
(C.1) Travel Costs (€) Justification
692,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
915,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
80,00 WP2: Local stakeholder event (2 events; 1
day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
950,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 1 person).
941,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
237,00 WP5: Training data analyses (1 day; 1
person).
593,00 WP5: 2nd meeting (0,5 day; 1 person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
244,00 WP5: Training second snapshot (1 day; 1
person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training (1 day; 1 person).
245,00 WP5: Final workshop (1 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
200,00 Organisation of Policy decision makers local
event (10 participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
4.500,00 WP5 - FoodCASE - hosting costs.
2.500,00 WP5 – Publications (Open Access).
300,00 WP5 - Promotional material (flyers - 1.500
units).
Total Costs (€) of (C) 21.678,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 8.939,07
Total estimated eligible costs 136.640,07
Applicant No. & Short Name 13 ICH
Date: 09/07/2020 124 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 3.292,83 4 13.171,32
Senior researcher 3.031,71 3 9.095,12
Senior researcher 2.855,77 2,5 7.139,43
Researcher 2.088,07 14 29.232,98
Researcher 1.878,02 6 11.268,14
Junior researcher 1.365,66 19 25.947,54
Junior researcher 1.365,66 17 23.216,22
Total person Total Costs (€)
month for (A)
65,5 119.070,75
Justification
Person-month per WP (65,5 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP5: 17 PM,
WP6: 20 PM, WP7: 24,5 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1
day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
960,00 WP4: Policy dialogue with Member States
stakeholders (Mediterranean and Balkan
European Region) (2 days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders
(2 days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
Date: 09/07/2020 125 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
230,00 WP5: Training second snapshot (1 day; 1
person).
245,00 WP5: Final workshop (1 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
1.008,00 WP6: Meeting 1 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Meeting 2 of the EU oversight WG (1
day; 1 person).
732,00 WP6: Meeting 3 of the EU oversight WG (1
day; 1 person).
976,00 WP6: Meeting 4 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Workshop to support MS in the
transposition of AVMSD (1 day; 1 person).
988,00 WP6: Workshop regarding the EU-wide
harmonised and comprehensive monitoring
protocol (2 days; 1 person).
1.008,00 WP6: Workshop regarding guidance for
codes of practices (2 days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
118,50 WP7: Kick-off meeting (0,5 day; 1 person).
20,00 WP7: Inter-sectoral group meeting (2 days;
1 person).
20,00 WP7: National meeting (2 days; 1 person).
1.115,00 WP7: 1st meeting (3 days; 1 person).
180,00 WP7: 2nd meeting (1 day; 1 person).
1.040,00 WP7: Workshop (3 days; 1 person).
900,00 WP7: 3rd meeting (2 days; 1 person).
2.215,00 WP7: Reimbursement for external
procurement officer (2 meetings; 3 days; 1
person).
(C.2) Equipment Costs (€) Justification
1.000,00 Laptop
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organisation of 2 Local stakeholder events
(50 participants/meeting; venue and
catering).
200,00 Organisation of Policy decision makers local
event (25 participants; venue and catering).
2.500,00 Purchase of food groups (WP5).
625,00 Organisation of WP7 inter-sectoral group
meeting (30 participants; venue and
catering).
1.100,00 Organisation of WP7 national meeting (30
participants; venue and catering).
1.000,00 Translation of training material (WP7; 35
pages).
Total Costs (€) of (C) 29.564,50
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 10.404,47
Total estimated eligible costs 159.039,72
Date: 09/07/2020 126 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Applicant No. & Short Name 14 SU
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 4.837,00 14 67.718,00
Content manager 4.837,00 10 48.370,00
Communications coordinator 3.564,00 34 121.176,00
IT specialist 3.564,00 6 21.384,00
Social media specialist 3.564,00 7 24.948,00
Designer 2.546,00 2 5.092,00
Total person Total Costs (€)
month for (A)
73 288.688,00
Justification
Person-month per WP (73 PM):
WP1: 2 PM, WP2: 67 PM, WP3: 2 PM, WP4: 2 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
25.000,00 Best-ReMaP promotion and related marketing
costs
External audio-visual experts will be
subcontracted in order to produce two
promotional videos on Best-ReMaP.
28.000,00 Best-ReMaP social media communication costs
Facebook campaigns are a highly influential part
of WP2's communication strategy in the Best-
ReMaP project. Without these paid campaigns
WP2 would not be able to promote the results
of the project effectively.
Total Costs (€) of (B) 53.000,00
(C) Other direct costs
(C.1) Travel Costs (€) Justification
2.196,00 WP1: Policy decision making forum (3
meetings; 1 day; 1 person).
20,00 WP1: 2nd GA + 3th SC (2 days; 1 person).
860,00 WP1: 1st Conference + 4th SC (2 days; 1
person).
960,00 WP1: 3rd GA + 5th SC (2 days; 1 person).
704,00 WP1: 6th SC (1 day; 1 person).
990,00 WP1: Final Conference + 4th GA + 7th SC (2
days; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
950,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 1 person).
464,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
245,00 WP5: Final workshop (1 day; 1 person).
Date: 09/07/2020 127 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(C.2) Equipment Costs (€) Justification
1.200,00 High-resolution camera and video recorder
(C.3) Other goods and services Costs (€) Justification
2.985,00 Organisation of 2nd GA (50 participants) and
3rd SC (20 participants) (venue and
catering).
2.000,00 Promotional material (the roll-ups (6 units),
flyers, posters (20 units) etc.).
900,00 Organisation of 3rd WP5 meeting (30
participants; venue and catering).
900,00 Organisation of Training second snapshot (6
participants; venue and catering).
6.000,00 Audit.
Total Costs (€) of (C) 21.741,50
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 25.440,07
Total estimated eligible costs 388.869,57
Applicant No. & Short Name NIPN
(If affiliated entity: Affiliated 14 SU
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 4.673,00 12 56.076,00
Senior researcher 4.673,00 4 18.692,00
Researcher 2.207,00 3 6.621,00
Researcher 2.207,00 7 15.449,00
Researcher 2.207,00 3 6.621,00
Researcher 2.207,00 2 4.414,00
Researcher 2.207,00 7 15.449,00
Researcher 2.207,00 6 13.242,00
Researcher 2.207,00 3 6.621,00
Researcher 2.207,00 3 6.621,00
Junior researcher 2.136,00 5 10.680,00
Total person Total Costs (€)
month for (A)
55 160.486,00
Justification
Person-month per WP (55 PM):
WP1: 0,5 PM, WP2: 4,5 PM, WP3: 0,5 PM, WP4: 0,5 PM, WP 5:
19 PM, WP7: 30 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
Date: 09/07/2020 128 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
20,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1
day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
950,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
20,00 WP5: 3rd meeting (0,5 day; 1 person).
20,00 WP5: Training second snapshot (1 day; 1
person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training (1 day; 1 person).
245,00 WP5: Final workshop (1 day; 1 person).
118,50 WP7: Kick-off meeting (0,5 day; 1 person).
20,00 WP7: Inter-sectoral group meeting (2 days; 1
person).
20,00 WP7: National meeting (2 days; 1 person).
1.115,00 WP7: 1st meeting (3 days; 1 person).
180,00 WP7: 2nd meeting (1 day; 1 person).
1.040,00 WP7: Workshop (3 days; 1 person).
900,00 WP7: 3rd meeting (2 days; 1 person).
2.215,00 WP7: Reimbursement for external
procurement officer (2 meetings; 3 days; 1
person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organisation of 2 Local stakeholder events
(25 participants/meeting; venue and
catering).
200,00 Organisation of Policy decision makers local
event (10 participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
2.000,00 Organisation of WP7 inter-sectoral group
meeting (25 participants; venue and
catering).
Date: 09/07/2020 129 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
2.000,00 Organisation of WP7 national meeting (30
participants; venue and catering).
1.000,00 Translation of training material (WP7; 35
pages).
Total Costs (€) of (C) 24.998,50
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 12.983,92
Total estimated eligible costs 198.468,42
Applicant No. & Short Name 15 DoH
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 7.788,67 19 147.984,73
Senior researcher 6.166,66 1 6.166,66
Total person Total Costs (€)
month for (A)
20 154.151,39
Justification
Person-month per WP (20 PM):
WP1: 2 PM, WP2: 2 PM, WP3: 2 PM, WP4: 2 PM, WP5: 1 PM,
WP6: 11 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA + 1st SC (2
days; 1 person).
2.196,00 WP1: Policy decision making forum (3
meetings; 1 day; 1 person).
944,00 WP1: 2nd GA + 3th SC (2 days; 1 person).
860,00 WP1: 1st Conference + 4th SC (2 days; 1
person).
960,00 WP1: 3rd GA + 5th SC (2 days; 1 person).
704,00 WP1: 6th SC (1 day; 1 person).
990,00 WP1: Final Conference + 4th GA + 7th SC (2
days; 1 person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1
day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
Date: 09/07/2020 130 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
950,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 1 person).
464,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
237,00 WP5: Training data analyses (1 day; 1
person).
116,00 WP5: 2nd meeting (0,5 day; 1 person).
232,00 WP5: Training first snapshot (1 day; 1
person).
622,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
180,00 WP5: Training (1 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training (1 day; 1 person).
245,00 WP5: Final workshop (1 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
20,00 WP6: Meeting 1 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Meeting 2 of the EU oversight WG (1
day; 1 person).
732,00 WP6: Meeting 3 of the EU oversight WG (1
day; 1 person).
976,00 WP6: Meeting 4 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Workshop to support MS in the
transposition of AVMSD (1 day; 1 person).
988,00 WP6: Workshop regarding the EU-wide
harmonised and comprehensive monitoring
protocol (2 days; 1 person).
20,00 WP6: Workshop regarding guidance for
codes of practices (2 days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
1.875,00 Organisation of 2 Local stakeholder events
(60 participants/meeting; venue and
catering).
200,00 Organisation of Policy decision makers local
event (40 participants; venue and catering).
2.886,00 Organisation of Meeting 1 of the EU
oversight WG (24 participants; venue and
catering).
3.276,00 Organisation of Workshop regarding
guidance for codes of practices (24
participants; venue and catering).
Total Costs (€) of (C) 24.831,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 12.528,77
Date: 09/07/2020 131 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Total estimated eligible costs 191.511,16
Applicant No. & Short Name FSAI
(If affiliated entity: Affiliated 15 DoH
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 11.368,66 5 56.843,32
Researcher 4.417,51 4 17.670,03
Junior researcher 2.677,97 6 16.067,81
Junior researcher 2.677,97 6 16.067,81
Junior researcher 2.677,97 3 8.033,91
Total person Total Costs (€)
month for (A)
24 114.682,88
Justification
Person-month per WP (24 PM):
WP1: 0,5 PM, WP2: 0,5 PM, WP3: 0,5 PM, WP4: 0,5 PM, WP5:
22 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
950,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day;
1 person).
237,00 WP5: Training data analyses (1 day; 1
person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
Date: 09/07/2020 132 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
232,00 WP5: Training first snapshot (1 day; 1
person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
180,00 WP5: Training (1 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training (1 day; 1 person).
245,00 WP5: Final workshop (1 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
5.000,00 Purchase of food groups (WP5).
Total Costs (€) of (C) 13.805,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 8.994,15
Total estimated eligible costs 137.482,03
Applicant No. & Short Name CHDR
(If affiliated entity: Affiliated 15 DoH
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-
month
Senior researcher 17.101,24 4 68.404,96
Researcher 9.224,46 4 36.897,84
Project Management Officer 8.550,00 2,5 21.375,00
Junior researcher 4.674,19 10,5 49.079,00
Total person Total Costs (€) for (A)
month
21 175.756,80
Justification
Person-month per WP (21 PM):
WP1: 0,5 PM, WP2: 0,5 PM, WP3: 0,5 PM, WP4: 0,5 PM, WP6:
19 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
External expertise for key tasks in WP 6
An EU WHO recognised subcontractor will work on
85.000,00 tasks 6.4 and 6.5 and will support the development
and implementation of the monitoring protocols
and support their implementation in the broader
EU context. Traditional media as well as digital
media will be addressed and media literacy of
children evaluated where possible. The
subcontractor will support the development of the
codes of practice in the interested MS.
Total Costs (€) of (B) 85.000,00
(C) Other direct costs
Date: 09/07/2020 133 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(C.1) Travel Costs (€) Justification
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
950,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2 days;
1 person).
988,00 WP6: Workshop regarding the EU-wide
harmonised and comprehensive monitoring
protocol (2 days; 1 person).
20,00 WP6: Workshop regarding guidance for codes of
practices (2 days; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and Costs (€) Justification
services
2.038,00 Audit.
Total Costs (€) of (C) 7.750,00
(D) Indirect Costs Total Costs
(€)
(Max. 7% on A, B and C) 18.795,48
Total estimated eligible costs 287.302,28
Applicant No. & Short Name 16 ISS
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 6.700,00 24 160.800,00
Researcher 5.022,31 10 50.223,10
Researcher 4.850,00 23 111.550,00
Total person Total Costs (€) for
month (A)
57 322.573,10
Justification
Person-month per WP (57 PM):
WP1: 2 PM, WP2: 2 PM, WP3: 2 PM, WP4: 38 PM, WP5: 13 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
91.000,00 External expertise for tasks within WP 4
The subcontractor will contribute to identifying
and analysing pertinent key EU processes and
tools, with additional focus on equity and
sustainability. A subcontractor will facilitate
setting the objectives with the Member States
representatives and EU stakeholders
participating to the Policy Dialogue events and
Date: 09/07/2020 134 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
will produce short policy briefs with Member
States based on Best-ReMaP JA outcomes, to
inform the participating stakeholders of what has
been achieved up to date in order to build on,
rather than replicate, existing work.
Total Costs (€) of (B) 91.000,00
(C) Other direct costs
(C.1) Travel Costs (€) Justification
2.196,00 WP1: Policy decision making forum (3
meetings; 1 day; 1 person).
944,00 WP1: 2nd GA + 3th SC (2 days; 1 person).
860,00 WP1: 1st Conference + 4th SC (2 days; 1
person).
20,00 WP1: 3rd GA + 5th SC (2 days; 1 person).
704,00 WP1: 6th SC (1 day; 1 person).
990,00 WP1: Final Conference + 4th GA + 7th SC (2
days; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1 day;
1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
20,00 WP4: Policy dialogue with Member States
stakeholders (Mediterranean and Balkan
Region) (2 days; 1 person).
950,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 1 person).
988,00 WP4: Policy dialogue with Member States
stakeholders (Scandinavian and Eastern
European Region) (2 days; 1 person).
464,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
10.320,00 Reimbursement for HLG on nutrition members
(1st Conference; 2 days; 12 participants).
11.760,00 Reimbursement for HLG on nutrition members
(Policy dialogues; 2 days; 12 participants).
116,00 WP5: 2nd meeting (0,5 day; 1 person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
20,00 WP5: 5th meeting (0,5 day; 1 person).
20,00 WP5: Training second snapshot (1 day; 1
person).
245,00 WP5: Final workshop (1 day; 1 person).
(C.2) Equipment Costs (€) Justification
2.600,00 Notebook (2x)
(C.3) Other goods and services Costs (€) Justification
1.766,50 Organisation of 3rd GA (50 participants) and
5th SC (20 participants) (venue and catering).
1.600,00 Organisation of 2 Local stakeholder events (50
participants/meeting; venue and catering).
200,00 Organisation of Policy decision makers local
event (10 participants; venue and catering).
Date: 09/07/2020 135 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
1.800,00 Organisation of Policy dialogue with Member
States stakeholders (Mediterranean and
Balkan Region) (20 participants; venue and
catering).
1.500,00 Organisation of Policy dialogue with EU
stakeholders (15 participants; venue and
catering).
500,00 Organisation of 5th WP5 meeting (30
participants; venue and catering).
500,00 Organisation of Training second snapshot (18
participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
6.000,00 Audit.
Total Costs (€) of (C) 52.703,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 32.639,33
Total estimated eligible costs 498.915,43
Applicant No. & Short Name 17 CDPC
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 1.841,42 8 14.731,37
Senior researcher 1.501,78 7,2 10.812,84
Researcher 1.486,88 1 1.486,88
Junior researcher 1.059,62 6,8 7.205,40
Total person Total Costs (€) for
month (A)
23 34.236,49
Justification
Person-month per WP (23 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP6: 19 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
2.417,70 WP6 - expert consultation about Nutrition Profile
and EU-wide harmonised and comprehensive
monitoring protocol for reducing unhealthy food
marketing to children.
Total Costs (€) of (B) 2.417,70
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
Date: 09/07/2020 136 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
718,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1 day;
1 person).
622,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
988,00 WP4: Policy dialogue with Member States
stakeholders (Scandinavian and Eastern
European Region) (2 days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
1.008,00 WP6: Meeting 1 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Meeting 2 of the EU oversight WG (1
day; 1 person).
732,00 WP6: Meeting 3 of the EU oversight WG (1
day; 1 person).
976,00 WP6: Meeting 4 of the EU oversight WG (2
days; 1 person).
988,00 WP6: Workshop regarding the EU-wide
harmonised and comprehensive monitoring
protocol (2 days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
1.735,00 Organisation of 2 Local stakeholder events (35
participants/meeting; venue and catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
Total Costs (€) of (C) 15.227,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 3.631,68
Total estimated eligible costs 55.512,87
Applicant No. & Short Name 18 LR SAM
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 1.574,30 8 12.594,40
Total person Total Costs (€) for
month (A)
8 12.594,40
Date: 09/07/2020 137 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Justification
Person-month per WP (8 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP6: 4 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1 day;
1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
988,00 WP4: Policy dialogue with Member States
stakeholders (Scandinavian and Eastern
European Region) (2 days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
1.008,00 WP6: Meeting 1 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Meeting 2 of the EU oversight WG (1
day; 1 person).
732,00 WP6: Meeting 3 of the EU oversight WG (1
day; 1 person).
976,00 WP6: Meeting 4 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Workshop to support MS in the
transposition of AVMSD (1 day; 1 person).
1.008,00 WP6: Workshop regarding guidance for codes
of practices (2 days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organisation of 2 Local stakeholder events (40
participants/meeting; venue and catering).
200,00 Organisation of Policy decision makers local
event (15 participants; venue and catering).
Total Costs (€) of (C) 15.116,00
(D) Indirect Costs Total Costs (€)
Date: 09/07/2020 138 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(Max. 7% on A, B and C) 1.939,73
Total estimated eligible costs 29.650,13
Applicant No. & Short Name 19 MFH
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 8.085,00 4 32.340,00
Researcher 5.800,00 15 87.000,00
Researcher 5.800,00 4 23.200,00
Junior researcher 2.830,00 5 14.150,00
Junior researcher 2.775,00 5 13.875,00
Total person Total Costs (€) for
month (A)
33 170.565,00
Justification
Person-month per WP (33 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP5: 17 PM,
WP7: 12 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1 day;
1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
960,00 WP4: Policy dialogue with Member States
stakeholders (Mediterranean and Balkan
European Region) (2 days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day; 1
person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
Date: 09/07/2020 139 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training second snapshot (1 day; 1
person).
245,00 WP5: Final workshop (1 day; 1 person).
118,50 WP7: Kick-off meeting (0,5 day; 1 person).
20,00 WP7: Inter-sectoral group meeting (2 days; 1
person).
20,00 WP7: National meeting (2 days; 1 person).
180,00 WP7: 2nd meeting (1 day; 1 person).
1.040,00 WP7: Workshop (3 days; 1 person).
900,00 WP7: 3rd meeting (2 days; 1 person).
1.160,00 WP7: Reimbursement for external
procurement officer (2 meetings; 3 days; 1
person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organisation of 2 Local stakeholder events (50
participants/meeting; venue and catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
2.000,00 Organisation of WP7 inter-sectoral group
meeting (25 participants; venue and catering).
2.000,00 Organisation of WP7 national meeting (30
participants; venue and catering).
4.000,00 Organisation of WP7 1st meeting (30
participants; venue and catering).
1.000,00 Translation of training material (WP7; 35
pages).
Total Costs (€) of (C) 28.808,50
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 13.956,15
Total estimated eligible costs 213.329,65
Applicant No. & Short Name 20 RIVM
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 10.466,00 0,95 9.942,70
Senior researcher 9.502,00 2,95 28.030,90
Senior researcher 8.352,00 4,4 36.748,80
Researcher 7.465,00 0,5 3.732,50
Junior researcher 6.532,00 1 6.532,00
Research dietition 5.883,00 1 5.883,00
Project assistant 4.263,00 0,2 852,60
Date: 09/07/2020 140 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Total person Total Costs (€) for
month (A)
11 91.722,50
Justification
Person-month per WP (11 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP5: 7 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1 day;
1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
950,00 WP4: Policy dialogue with Member States
stakeholders (Middle European Region) (2
days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day; 1
person).
237,00 WP5: Training data analyses (1 day; 1 person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
244,00 WP5: Training second snapshot (1 day; 1
person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training (1 day; 1 person).
245,00 WP5: Final workshop (1 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
800,00 Organisation of 2 Local stakeholder events (50
participants/meeting; venue and catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
Total Costs (€) of (C) 10.641,00
(D) Indirect Costs Total Costs (€)
Date: 09/07/2020 141 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
(Max. 7% on A, B and C) 7.165,45
Total estimated eligible costs 109.528,95
Applicant No. & Short Name 21 SUM
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 2.800,00 13 36.400,00
Researcher 1.200,00 18 21.600,00
Total person Total Costs (€) for
month (A)
31 58.000,00
Justification
Person-month per WP (31 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP5: 13 PM,
WP7: 14 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1 day;
1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
988,00 WP4: Policy dialogue with Member States
stakeholders (Scandinavian and Eastern
European Region) (2 days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day; 1
person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
232,00 WP5: Training first snapshot (1 day; 1 person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
180,00 WP5: Training (1 day; 1 person).
Date: 09/07/2020 142 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
115,00 WP5: 5th meeting (0,5 day; 1 person).
245,00 WP5: Final workshop (1 day; 1 person).
118,50 WP7: Kick-off meeting (0,5 day; 1 person).
20,00 WP7: Inter-sectoral group meeting (2 days; 1
person).
20,00 WP7: National meeting (2 days; 1 person).
1.115,00 WP7: 1st meeting (3 days; 1 person).
180,00 WP7: 2nd meeting (1 day; 1 person).
1.040,00 WP7: Workshop (3 days; 1 person).
900,00 WP7: 3rd meeting (2 days; 1 person).
2.215,00 WP7: Reimbursement for external
procurement officer (2 meetings; 3 days; 1
person).
6.000,00 WP7: Reimbursement for external participants
(WP7 national meeting; 3 days; 20 persons)
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organisation of 2 Local stakeholder events (50
participants/meeting; venue and catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
2.000,00 Organisation of WP7 inter-sectoral group
meeting (25 participants; venue and catering).
2.000,00 Organisation of WP7 national meeting (30
participants; venue and catering).
1.000,00 Translation of training material (WP7; 35
pages).
1.000,00 Publication (WP7; 6.000-8.000 words).
Total Costs (€) of (C) 34.188,50
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 6.453,20
Total estimated eligible costs 98.641,70
Applicant No. & Short Name 22 DGS
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Communication expert 3.898,24 13,3 51.846,59
Researcher 2.237,59 11,2 25.061,01
Researcher 1.900,00 10 19.000,00
Researcher 1.900,00 10 19.900,00
Technical expert 1.664,91 14 23.308,74
Technical expert 1.201,48 8,5 10.212,58
Financial expert 1.201,48 8,5 10.212,58
Total person Total Costs (€) for
month (A)
Date: 09/07/2020 143 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
75,5 158.641,50
Justification
Person-month per WP (75,5 PM):
WP1: 2 PM, WP2: 2 PM, WP3: 2 PM, WP4: 2 PM, WP5: 7 PM,
WP6: 60,5 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA + 1st SC (2
days; 1 person).
2.196,00 WP1: Policy decision making forum (3
meetings; 1 day; 1 person).
20,00 WP1: 2nd GA + 3th SC (2 days; 1 person).
860,00 WP1: 1st Conference + 4th SC (2 days; 1
person).
960,00 WP1: 3rd GA + 5th SC (2 days; 1 person).
500,00 WP1: 6th SC (1 day; 1 person).
990,00 WP1: Final Conference + 4th GA + 7th SC (2
days; 1 person).
718,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1 day;
1 person).
622,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
30,00 WP4: Policy decision makers local event (0,5
day; 1 person).
960,00 WP4: Policy dialogue with Member States
stakeholders (Mediterranean and Balkan
Region) (2 days; 1 person).
464,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
837,00 WP5: Initial workshop + 1st meeting (1 day; 1
person).
116,00 WP5: 2nd meeting (0,5 day; 1 person).
622,00 WP5: 3rd meeting (0,5 day; 1 person).
590,00 WP5: 4th meeting (0,5 day; 1 person).
615,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training second snapshot (1 day; 1
person).
745,00 WP5: Final workshop (1 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
1.008,00 WP6: Meeting 1 of the EU oversight WG (2
days; 1 person).
20,00 WP6: Meeting 2 of the EU oversight WG (1
day; 1 person).
Date: 09/07/2020 144 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
732,00 WP6: Meeting 3 of the EU oversight WG (1
day; 1 person).
976,00 WP6: Meeting 4 of the EU oversight WG (2
days; 1 person).
20,00 WP6: Workshop to support MS in the
transposition of AVMSD (1 day; 1 person).
988,00 WP6: Workshop regarding the EU-wide
harmonised and comprehensive monitoring
protocol (2 days; 1 person).
1.008,00 WP6: Workshop regarding guidance for codes
of practices (2 days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organisation of 6th SC (20 participants; venue
and catering).
2.000,00 Organisation of 2 Local stakeholder events (50
participants/meeting; venue and catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
2.000,00 Organisation of Meeting 2 of the EU oversight
WG (24 participants; venue and catering).
2.000,00 Organisation of Workshop to support MS in
the transposition of AVMSD (24 participants;
venue and catering).
Total Costs (€) of (C) 31.865,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 13.335,46
Total estimated eligible costs 203.841,96
Applicant No. & Short Name FCNAUP
(If affiliated entity: Affiliated 22 DGS
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Research fellowship 1.124,70 4 4.498,80
Research fellowship 1.124,70 7,5 8.435,25
Total person Total Costs (€) for
month (A)
11,5 12.934,05
Justification
Person-month per WP (11,5 PM):
WP1: 0,5 PM, WP2: 0,5 PM, WP3: 0,5 PM, WP4: 0,5 PM, WP 5:
7 PM, WP6: 2,5 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Date: 09/07/2020 145 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
20,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
960,00 WP4: Policy dialogue with Member States
stakeholders (Mediterranean and Balkan
Region) (2 days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day; 1
person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training second snapshot (1 day; 1
person).
245,00 WP5: Final workshop (1 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
20,00 WP6: Workshop to support MS in the
transposition of AVMSD (1 day; 1 person).
1.008,00 WP6: Workshop regarding guidance for codes
of practices (2 days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
Total Costs (€) of (C) 8.511,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 1.501,15
Total estimated eligible costs 22.946,20
Date: 09/07/2020 146 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Applicant No. & Short Name 23 NIPH
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior specialist 3.157,90 11 34.736,85
Junior specialist 1.684,21 20,6 34.694,74
Administrative specialist 1.473,68 1,8 2.652,63
Legal specialist 1.473,68 0,6 884,21
Total person Total Costs (€) for
month (A)
34 72.968,43
Justification
Person-month per WP (34 PM):
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP 5: 17 PM,
WP6: 13 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1 day;
1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
988,00 WP4: Policy dialogue with Member States
stakeholders (Scandinavian and Eastern
European Region) (2 days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
237,00 WP5: Initial workshop + 1st meeting (1 day; 1
person).
616,00 WP5: 2nd meeting (0,5 day; 1 person).
Date: 09/07/2020 147 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
122,00 WP5: 3rd meeting (0,5 day; 1 person).
90,00 WP5: 4th meeting (0,5 day; 1 person).
115,00 WP5: 5th meeting (0,5 day; 1 person).
230,00 WP5: Training second snapshot (1 day; 1
person).
230,00 WP5: Training (1 day; 1 person).
245,00 WP5: Final workshop (1 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
1.008,00 WP6: Meeting 1 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Meeting 2 of the EU oversight WG (1
day; 1 person).
732,00 WP6: Meeting 3 of the EU oversight WG (1
day; 1 person).
976,00 WP6: Meeting 4 of the EU oversight WG (2
days; 1 person).
704,00 WP6: Workshop to support MS in the
transposition of AVMSD (1 day; 1 person).
988,00 WP6: Workshop regarding the EU-wide
harmonised and comprehensive monitoring
protocol (2 days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
600,00 Organisation of 2 Local stakeholder events (50
participants/meeting; venue and catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
5.000,00 Purchase of food groups (WP5).
Total Costs (€) of (C) 20.581,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 6.548,46
Total estimated eligible costs 100.097,89
Applicant No. & Short Name 24 IPHS
(If affiliated entity: Affiliated
to which Applicant
number/Short name)
(A) Direct personnel costs
Staff function Monthly Cost Estimated Sum Cost (€)
Person-month
Senior researcher 2.300,00 1 2.300,00
Researcher 2.000,00 4,6 9.200,00
Researcher 1.980,00 1 1.980,00
Researcher 1.980,00 1,6 3.168,00
Financial/accounting officer 1.100,00 0,8 880,00
Total person Total Costs (€) for
month (A)
9 17.528,00
Justification
Person-month per WP (9 PM):
Date: 09/07/2020 148 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
WP1: 1 PM, WP2: 1 PM, WP3: 1 PM, WP4: 1 PM, WP6: 5 PM
(B) Direct costs of sub- Costs (€) Task(s)/Justification
contracting
Total Costs (€) of (B)
(C) Other direct costs
(C.1) Travel Costs (€) Justification
1.074,00 WP1: Kick-off meeting + 1st GA (2 days; 1
person).
944,00 WP1: 2nd GA (2 days; 1 person).
860,00 WP1: 1st Conference (2 days; 1 person).
960,00 WP1: 3rd GA (2 days; 1 person).
990,00 WP1: Final Conference + 4th GA (2 days; 1
person).
118,50 WP2: Kick-off meeting (0,5 day; 1 person).
40,00 WP2: Local stakeholder event (2 events; 1 day;
1 person).
122,50 WP2: Final meeting (0,5 day; 1 person).
118,50 WP3: Kick-off meeting (0,5 day; 1 person).
122,50 WP3: Final meeting (0,5 day; 1 person).
118,50 WP4: Kick-off meeting (0,5 day; 1 person).
960,00 WP4: Policy dialogue with Member States
stakeholders (Mediterranean and Balkan
Region) (2 days; 1 person).
964,00 WP4: Policy dialogue with EU stakeholders (2
days; 1 person).
122,50 WP4: Final meeting (0,5 day; 1 person).
118,50 WP6: Kick-off meeting (0,5 day; 1 person).
988,00 WP6: Workshop regarding the EU-wide
harmonised and comprehensive monitoring
protocol (2 days; 1 person).
122,50 WP6: Final meeting (0,5 day; 1 person).
(C.2) Equipment Costs (€) Justification
(C.3) Other goods and services Costs (€) Justification
2.000,00 Organisation of 2 Local stakeholder events (50
participants/meeting; venue and catering).
200,00 Organisation of Policy decision makers local
event (20 participants; venue and catering).
Total Costs (€) of (C) 10.944,00
(D) Indirect Costs Total Costs (€)
(Max. 7% on A, B and C) 1.993,04
Total estimated eligible costs 30.465,04
Date: 09/07/2020 149 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
11 PREVIOUS AND CURRENT GRANTS RELEVANT TO THE PROGRAMME
PREVIOUS AND CURRENT GRANTS RELEVANT TO 3HP
JANPA, EUREMO, CHRODIS +, ADVANTAGE, CANCON, eHAction, EU-JAV,
NIJZ
Healthy Gateways, InfAct, INTEGRATE, iPAAC, JAHEE, SHARP
BMASGK JANPA
AGES JANPA
GOeG InfAct, JAMRAI, JAseHN, eHAction
SCIENSANO ADVANTAGE, EMERGE, INFACT, IPAAC, JANPA, JARC
MCA EU-JAV, Healthy GateWays, InfAct, JAHEE, SHARP JA, WholEUGrain
PHI-FBH EU-JAV, Healthy GateWays, JAHEE,
iPAAC, JAHEE, JANPA, CHRODIS, RARHA, CANCON, ADVANTAGE, JATC,
NCPHA
CHRODIS PLUS
IMOVE+, HA-REACT, EMERGE, JANPA, SHARP JA, INTEGRATE, CHRODIS+,
CIPH
JAMRAI, EU-JAV, InfAct, iPAAC, JARC, EUnetHTA, Healthy Gateways
iPAAC, JAHEE, Healthy GateWays, eHAction, EUnetHTA JA 3 ,ADVANTAGE,
MoH CY
JAMS, JARC, CHRODIS+, EU-JAMRAI, InfAct
DVFA WholEUGrain
MoSA SHARP JA, EHaction, InfAct, EE-PCY
NIHD JANPA, JAHEE, INTEGRATE, HA-REACT
THL JANPA, CHRODIS-PLUS, CHRODIS
ANSES EU-JAMRAI, EU-JANPA, JATC, Euremo, SPIDNET
ADVANTAGE, EU-InFact, E U-SHARP, EU-JAMRAI, EU-SAFECARE, EU- MyPeBS,
SPF
HBM4EU, SPIDNET
ADVANTAGE, EU-InFact, EU-JAHEE, EU-JAV, E U-SHARP, EU-JAMRAI, EU-
MoH-FR
CHRODIS+, EU-JANPA, SPIDNET
SU EUNetHTA, JATC, CHRODIS PLUS, INTEGRATE, JAseHN, eHaction
NIPN JANPA
DoH iPAAC
CHDR DEDIPAC, JANPA
ISS JANPA, STOP, CHRODIS-JA
CDPC MH-WB, JANPA, RD-Action, HA- REACT, EU-JAV, InfAct
EU-JAV, IPAAC, JAHEE, INFACT, Healthy GateWays, eHAction, JAMRAI, GAPP,
EUNETHTA JA 3, JARC, ADVANTAGE, TRANSPOSE, CHRODIS PLUS, INTEGRATE,
MFH
JATC, SHARP, CARE (PROJECT), SH-CAPAC, OPEN, VISTART, ARTHIQS, JAseHN,
RD-ACTION, HA-REACT, JANPA
SHARP JA, EU-JAV, JAHEE, Healthy GateWays, iPAAC, InfAct, JATC, CHRODIS-
RIVM PLUS, EU-JAMRAI, EU-JAMRAI, ADVANTAGE, EMERGE, BRIDGE Health,
CHRODIS-JA
SUM JANPA, JAHEE
CHRODIS+, JATC, INTEGRATE, INFACT, JAHEE, JAV, iPAAC, EU Healthy
IPHS
GateWays, eHAction, SHARP
Date: 09/07/2020 150 / 151 Doc. Version:
<v.1.4>
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
12 CURRENT APPLICATIONS RELEVANT TO THE PROGRAMME
CURRENT APPLICATIONS in 3HP
NIJZ, BMASGK, GOeG, SCIENSANO, MCA, NCPHA,
JA-01-2019 Joint Action on CIPH, MoH CY, DVFA, MoSA, THL, ANSES, MRI, ICH,
implementation of validated best SU, DoH, ISS, CDPC, LR SAM, MFH, RIVM, SUM, DGS,
practices NIPH, IPHS, AGES, PHI-FBH, PHI-RS, CPH-MUN, NIHD,
SPF, MoH-FR, NIPN, FSAI, CHDR, FCNAUP
JA-02-2019 Joint Action to
strengthen health preparedness and NIJZ, CIPH, RIVM, LR SAM, IPHS, MFH, ANSES, MCA,
response to biological and chemical PHI-FBH
terror attacks
JA-03-2019 Joint Action on
NIJZ, CIPH, RIVM, LR SAM, SU, IPHS, MFH, MoSA,
implementation of digitally enabled
MCA, PHI-RS
integrated person-centred care
13 EXCEPTIONAL UTILITY
The Best-ReMaP Joint Action fulfils the criteria for EU co-funding of 80% due to exceptional
utility:
- 74% of total budget allocated to staff costs,
- 41% of the JA budget is allocated to lower-income Member States (gross national
income per inhabitant less than 90% of the Union average) - SI, BG, HR, CY, EE, GR, HU,
LV, LT, MT, PL, PO, RO plus RS, BA.
14 COLLABORATING STAKEHOLDERS
INSTITUTION CONTACT PERSON COUNTRY & CITY
ERGA Michal Hradicky Brussels, Belgium
JRC Jan Wollgast Ispra, Italy
WHO João Breda Moscow, Russia
OECD Michele Cecchini Paris, France
UNICEF Jo Jewell Brussels, Belgium
SCIENCE AND TECHNOLOGY
IN CHILDHOOD OBESITY Franco Sassi London, UK
POLICY (STOP)
DEPARTMENT OF HEALTH
Amy Smullen United Kingdom, London
AND SOCIAL CARE
NORWEGIAN DIRECTORATE
Henriette Øien Norway, Oslo
OF HEALTH
BELGIAN FEDERAL PUBLIC
Laurence Doughan Belgium, Brussels
SERVICE OF PUBLIC HEALTH
MINISTRY OF HEALTH OF
Hana Wijntjes Slovak Republic, Bratislava
THE SLOVAK REPUBLIC
https://co-create.interreg-
CO - CREATE Oslo, Norway
med.eu/special-pages/contact/
ICF Julien Etienne London, UK
AESAN Marta García Solano Madrid, Spain
Date: 09/07/2020 151 / 151 Doc. Version:
<v.1.4>
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
ESTIMATED BUDGET FOR THE ACTION Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Estimated eligible1 costs (per budget category) EU contribution Action's estimated receipts
Financial
B. Direct D. Indirect Reimbursement Maximum EU Maximum Income contributions
A. Direct C. Other Action’s
costs of Total costs generated given by third
personnel costs direct costs costs2 rate %3 contribution4 grant amount5 total receipts
subcontracting by the action parties to the
beneficiaries
A.1 Employees C.1 Travel
(or equivalent)
C.2 Equipment
A.2 Natural
persons under C.3 Other goods
direct contract and services
and seconded
persons
Cost form6 Actual Actual Actual Flat-rate7 7%
d=
a b c e = a+b+c+d f g=e*f h i j k=i+j
0.07 * (a+b+c)
1. NIJZ 603 900.00 170 000.00 187 186.77 67 276.07 1 028 362.84 80.00 822 690.27 822 690.27 0.00 0.00 0.00
2. BMASGK 150 066.39 15 000.00 23 412.50 13 193.52 201 672.41 80.00 161 337.93 161 337.93 0.00 0.00 0.00
- AGES 112 380.00 0.00 19 103.00 9 203.81 140 686.81 80.00 112 549.45 112 549.45 0.00 0.00 0.00
- GOeG 127 345.45 0.00 5 571.00 9 304.15 142 220.60 80.00 113 776.48 113 776.48 0.00 0.00 0.00
Σ beneficiary 389 791.84 15 000.00 48 086.50 31 701.48 484 579.82 387 663.86 387 663.86 0.00 0.00 0.00
3. SCIENSANO 352 752.08 0.00 57 695.00 28 731.30 439 178.38 80.00 351 342.70 351 342.70 0.00 0.00 0.00
4. MCA 20 024.50 0.00 30 370.00 3 527.62 53 922.12 80.00 43 137.70 43 137.70 0.00 0.00 0.00
- PHI-FBH 46 160.00 0.00 10 519.50 3 967.57 60 647.07 80.00 48 517.66 48 517.66 0.00 0.00 0.00
- PHI-RS 42 240.00 0.00 10 519.50 3 693.17 56 452.67 80.00 45 162.14 45 162.14 0.00 0.00 0.00
Σ beneficiary 108 424.50 0.00 51 409.00 11 188.36 171 021.86 136 817.50 136 817.50 0.00 0.00 0.00
5. NCPHA 30 644.69 0.00 32 067.50 4 389.85 67 102.04 80.00 53 681.63 53 681.63 0.00 0.00 0.00
6. CIPH 68 510.34 0.00 21 385.00 6 292.67 96 188.01 80.00 76 950.41 76 950.41 0.00 0.00 0.00
7. MoH CY 74 000.00 0.00 27 607.00 7 112.49 108 719.49 80.00 86 975.59 86 975.59 0.00 0.00 0.00
8. DVFA 131 858.29 0.00 16 398.00 10 377.94 158 634.23 80.00 126 907.38 126 907.38 0.00 0.00 0.00
- CPH-MUN 267 941.51 0.00 26 290.00 20 596.21 314 827.72 80.00 251 862.18 251 862.18 0.00 0.00 0.00
Σ beneficiary 399 799.80 0.00 42 688.00 30 974.15 473 461.95 378 769.56 378 769.56 0.00 0.00 0.00
Page 1 of 4
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
ESTIMATED BUDGET FOR THE ACTION Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Estimated eligible1 costs (per budget category) EU contribution Action's estimated receipts
Financial
B. Direct D. Indirect Reimbursement Maximum EU Maximum Income contributions
A. Direct C. Other Action’s
costs of Total costs generated given by third
personnel costs direct costs costs2 rate %3 contribution4 grant amount5 total receipts
subcontracting by the action parties to the
beneficiaries
A.1 Employees C.1 Travel
(or equivalent)
C.2 Equipment
A.2 Natural
persons under C.3 Other goods
direct contract and services
and seconded
persons
Cost form6 Actual Actual Actual Flat-rate7 7%
d=
a b c e = a+b+c+d f g=e*f h i j k=i+j
0.07 * (a+b+c)
9. MoSA 18 732.00 0.00 20 010.00 2 711.94 41 453.94 80.00 33 163.15 33 163.15 0.00 0.00 0.00
- NIHD 57 236.00 0.00 10 098.00 4 713.38 72 047.38 80.00 57 637.90 57 637.90 0.00 0.00 0.00
Σ beneficiary 75 968.00 0.00 30 108.00 7 425.32 113 501.32 90 801.05 90 801.05 0.00 0.00 0.00
10. THL 731 977.48 20 000.00 51 514.50 56 244.44 859 736.42 80.00 687 789.14 687 789.14 0.00 0.00 0.00
11. ANSES 564 538.26 0.00 26 418.50 41 366.97 632 323.73 80.00 505 858.98 505 858.98 0.00 0.00 0.00
- SPF 58 914.50 0.00 6 066.00 4 548.64 69 529.14 80.00 55 623.31 55 623.31 0.00 0.00 0.00
- MoH-FR 32 000.00 40 000.00 15 899.00 6 152.93 94 051.93 80.00 75 241.54 75 241.54 0.00 0.00 0.00
Σ beneficiary 655 452.76 40 000.00 48 383.50 52 068.54 795 904.80 636 723.83 636 723.83 0.00 0.00 0.00
12. MRI 106 023.00 0.00 21 678.00 8 939.07 136 640.07 80.00 109 312.06 109 312.06 0.00 0.00 0.00
13. ICH 119 070.75 0.00 29 564.50 10 404.47 159 039.72 80.00 127 231.78 127 231.78 0.00 0.00 0.00
14. SU 288 688.00 53 000.00 21 741.50 25 440.07 388 869.57 80.00 311 095.66 311 095.66 0.00 0.00 0.00
- NIPN 160 486.00 0.00 24 998.50 12 983.92 198 468.42 80.00 158 774.74 158 774.74 0.00 0.00 0.00
Σ beneficiary 449 174.00 53 000.00 46 740.00 38 423.99 587 337.99 469 870.40 469 870.40 0.00 0.00 0.00
15. DoH 154 151.39 0.00 24 831.00 12 528.77 191 511.16 80.00 153 208.93 153 208.93 0.00 0.00 0.00
- FSAI 114 682.88 0.00 13 805.00 8 994.15 137 482.03 80.00 109 985.62 109 985.62 0.00 0.00 0.00
- CHDR 175 756.80 85 000.00 7 750.00 18 795.48 287 302.28 80.00 229 841.82 229 841.82 0.00 0.00 0.00
Σ beneficiary 444 591.07 85 000.00 46 386.00 40 318.40 616 295.47 493 036.37 493 036.37 0.00 0.00 0.00
Page 2 of 4
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
ESTIMATED BUDGET FOR THE ACTION Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Estimated eligible1 costs (per budget category) EU contribution Action's estimated receipts
Financial
B. Direct D. Indirect Reimbursement Maximum EU Maximum Income contributions
A. Direct C. Other Action’s
costs of Total costs generated given by third
personnel costs direct costs costs2 rate %3 contribution4 grant amount5 total receipts
subcontracting by the action parties to the
beneficiaries
A.1 Employees C.1 Travel
(or equivalent)
C.2 Equipment
A.2 Natural
persons under C.3 Other goods
direct contract and services
and seconded
persons
Cost form6 Actual Actual Actual Flat-rate7 7%
d=
a b c e = a+b+c+d f g=e*f h i j k=i+j
0.07 * (a+b+c)
16. ISS 322 573.10 91 000.00 52 703.00 32 639.33 498 915.43 80.00 399 132.34 399 132.34 0.00 0.00 0.00
17. CDPC 34 236.49 2 417.70 15 227.00 3 631.68 55 512.87 80.00 44 410.30 44 410.30 0.00 0.00 0.00
18. LR SAM 12 594.40 0.00 15 116.00 1 939.73 29 650.13 80.00 23 720.10 23 720.10 0.00 0.00 0.00
19. MFH 170 565.00 0.00 28 808.50 13 956.15 213 329.65 80.00 170 663.72 170 663.72 0.00 0.00 0.00
20. RIVM 91 722.50 0.00 10 641.00 7 165.45 109 528.95 80.00 87 623.16 87 623.16 0.00 0.00 0.00
21. SUM 58 000.00 0.00 34 188.50 6 453.20 98 641.70 80.00 78 913.36 78 913.36 0.00 0.00 0.00
22. DGS 158 641.50 0.00 31 865.00 13 335.46 203 841.96 80.00 163 073.57 163 073.57 0.00 0.00 0.00
- FCNAUP 12 934.05 0.00 8 511.00 1 501.15 22 946.20 80.00 18 356.96 18 356.96 0.00 0.00 0.00
Σ beneficiary 171 575.55 0.00 40 376.00 14 836.61 226 788.16 181 430.53 181 430.53 0.00 0.00 0.00
23. NIPH 72 968.43 0.00 20 581.00 6 548.46 100 097.89 80.00 80 078.31 80 078.31 0.00 0.00 0.00
24. IPHS 17 528.00 0.00 10 944.00 1 993.04 30 465.04 80.00 24 372.03 24 372.03 0.00 0.00 0.00
Σ consortium 5 561 843.78 476 417.70 971 084.27 490 654.25 7 500 000.00 80.007 6 000 000.00 6 000 000.00 0.00 0.00 0.00
1 See Article 6 for the eligibility conditions.
2 The indirect costs claimed must be free of any amounts covered by an operating grant (received under any EU or Euratom funding programme). A beneficiary that receives an operating grant during the action's duration
cannot claim any indirect costs for the year(s)/reporting period(s) covered by the operating grant (see Article 6.2.D).
3 See Article 5.2 for the reimbursement rate.
4 This is the theoretical amount of the EU contribution, if the reimbursement rate is applied to all the budgeted costs. This theoretical amount is capped by the 'maximum grant amount'.
Page 3 of 4
Grant Agreement number: 951202 — Best-ReMaP — HP-JA-2019
ESTIMATED BUDGET FOR THE ACTION Associated with document Ref. Ares(2020)4587976 - 03/09/2020
5 The 'maximum grant amount' is the maximum grant amount decided by the Agency. It normally corresponds to the requested grant, but may be lower.
6 See Article 5 for the cost forms.
7 Flat rate : 7% of eligible direct costs.
Page 4 of 4
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
BUNDESMINISTERIUM FUER ARBEIT, SOZIALES, GESUNDHEIT UND
KONSUMENTENSCHUTZ (BMASGK), established in Radetzkystrasse 2, WIEN 1030, Austria,
(‘the beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘2’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-999467243_75_210--]
Karin SCHINDLER with ECAS id nshindka signed in the Participant
Portal on 17/09/2020 at 09:01:03 (transaction id SigId-82782-wHMK1
7AmPWgjfmikZLnzdE7ls9zKbzGUQg3YM3GrdLHmY1psNwhG2Ezo0rj
dzqTTafsuhNbC3Ob3dnzojAetBO30-jpJZscgsw0KXrgu252HNQS-vyw
WOeFwD0ddHs3BXA0iaj2TbKujTuM4xxkY11j1ZxpaA1HIk9yzSx8rslPi
osQg8IuxMMZdsd7D4oUf6Q4XWu). Timestamp by third party at
2020.09.17 10:01:09 CEST
1
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SCIENSANO (SCIENSANO), established in JULIETTE WYTSMANSTRAAT 14, ELSENE 1050,
Belgium, VAT number: BE0693876830, (‘the beneficiary’), represented for the purpose of signing
this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘3’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-906160809_75_210--]
Christian Léonard with ECAS id n0033s99 signed in the Participant
Portal on 08/09/2020 at 15:20:43 (transaction id SigId-13448-NsLFIb3
MgFDbeVyUpovYF11zzSdGUuu12p9QMzxciRP6JktrzPOezQYyxwZmpa
jWOfDgSayhlzWofT2kfDqR6smG-jpJZscgsw0KXrgu252HNQS-2SfZdDG
W6bzZ3YQ90zMtZ9lhEmmGMmNbLZR0zexOrBEA2JHnKf0vh5sb9mtv
unXR0HMbJZ9QWbA87mGziicOOIu). Timestamp by third party at
2020.09.08 16:20:51 CEST
2
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTRY OF CIVIL AFFAIRS (MCA), established in Trg Bosne i Hercegovine 1, SARAJEVO
71000, Bosnia and Herzegovina, (‘the beneficiary’), represented for the purpose of signing this
Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘4’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-998728588_75_210--]
Mirna Pavlović with ECAS id n003dye7 signed in the Participant
Portal on 18/09/2020 at 12:25:48 (transaction id SigId-96051-FTlCfeD
kYznROZ2zvBTMrWxzupgTYfzqpURqhv9e9IyoNpSwzjFpbhs6zRtgUb
FoZvBzyeu5KNo2G3Bn5JzQEzH8W-jpJZscgsw0KXrgu252HNQS-cMJA
CeH1y0YHHQxZiUFXLhiZG3OWFXSXAESVWsPUBNb4MX3DhPnc2tBe
aEdR1CAdIRrL7043tEwzICTGPq4w98). Timestamp by third party at
2020.09.18 13:25:55 CEST
3
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
NATSIONALEN CENTAR PO OBSHTESTVENO ZDRAVE I ANALIZI (NCPHA), established
in ACAD IVAN GESHOV BLVD 15, SOFIA 1431, Bulgaria, VAT number: BG176094665, (‘the
beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘5’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-986300754_75_210--]
Plamen DIMITROV with ECAS id ndimipam signed in the Participant
Portal on 09/09/2020 at 11:49:19 (transaction id SigId-21021-gNxnB
8pwiPOLtzNO01Nxa8uSNPtXQScmLzYdGE5ox3g8azKh1jreyM5x46A
N3MoDYG8rfwx4yImotZmEaohpbVG-jpJZscgsw0KXrgu252HNQS-Q8
viSjs0WRZ9R30coeL1bpBq8TlPk9Rb8M3qy9o8gzU1HNeGSOrztToHX
CRM2efzZAj3YiQMxuhtFa3oUskua9G). Timestamp by third party at
2020.09.09 12:49:29 CEST
4
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
HRVATSKI ZAVOD ZA JAVNO ZDRAVSTVO (CIPH), established in ROCKEFELLEROVA 7,
ZAGREB 10000, Croatia, VAT number: HR75297532041, (‘the beneficiary’), represented for the
purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘6’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-998128255_75_210--]
Krunoslav Capak with ECAS id n003ph9b signed in the Participant
Portal on 11/09/2020 at 11:42:41 (transaction id SigId-41110-hxh55
zUyxSLRWalHvWQLTxGtbJN02I0Xgu7ZgjwDI06wbQ2M46O90McxBx
MVZwlQkT2H2Lax7qNlv6llTwc4X8-jpJZscgsw0KXrgu252HNQS-E2CF
ob2BfBBWhwf422FzPCD5Oo457YuekBwsbTvRcdpL2WO4ng7rVxXn
zxRZWugiAiSjft2LFbqr18Jn1zPH21G). Timestamp by third party at
2020.09.11 12:42:48 CEST
5
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
Ministry of Health of the Republic of Cyprus (MoH CY), established in 1 Prodromou Street &
17 Chilonos Street 1 & 17, Nicosia 1448, Cyprus, (‘the beneficiary’), represented for the purpose of
signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘7’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-994267946_75_210--]
Olga KALAKOUTA with ECAS id nkalakoo signed in the Participant
Portal on 16/09/2020 at 13:32:10 (transaction id SigId-75369-uSNtJW
3UQrVE5zzmLdQzYwJ3AGM2zLOzyXxTVf6ja1VDXSWeUCEcSnMJdtl2L
97eazOkN4koVkymjgtbjK8n8mJG-jpJZscgsw0KXrgu252HNQS-JWzoah
Btx7Zt7sWPwu4XdU1d5AXf3OS1rLib5X4O88N8aNlo6VPW24XLE160
GqnxB13n3D6mG9FzdhAeytDsY2). Timestamp by third party at
2020.09.16 14:32:20 CEST
6
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
FODEVARESTYRELSEN (DVFA), established in STATIONSPARKEN 31, GLOSTRUP 2600,
Denmark, VAT number: DK62534516, (‘the beneficiary’), represented for the purpose of signing this
Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘8’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-900755775_75_210--]
Lene Breum LARSEN with ECAS id nlaleneb signed in the Participant
Portal on 09/09/2020 at 07:34:30 (transaction id SigId-17152-HQhbQ
zc1QzITty67mYP6m19tcE211pkLZzPTc4R0DmFDvAEOtzq2XCmzIYNe
wy3UMy39E4ofMFGbU9tHpzRDTNYG-jpJZscgsw0KXrgu252HNQS-8z
st0wzKzjFvhqp2zZsr1T5nTjjsbdbvPmyy1SYyh2RIZOZlBBEuWRTW6Su
oJiaybadOLN7I0QUDaynGJyW0P8K). Timestamp by third party at
2020.09.09 08:34:37 CEST
7
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SOTSIAALMINISTEERIUM (MoSA), established in Suur-Ameerika 1, TALLINN 10122, Estonia,
(‘the beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘9’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-998429731_75_210--]
Marika PRISKE with ECAS id nprmaika signed in the Participant
Portal on 18/09/2020 at 09:16:53 (transaction id SigId-92900-yjqm
42QBVRY67WoX8VnsTduf0WvXJKrSeSBS82hQFDyJXxPTRvXpv54S3
9gtO7zjpZ31QMznsirCDUsNutuzh00-jpJZscgsw0KXrgu252HNQS-Lz
RTsyzR5kEtaGd8FbeZo9MtDRT4EzKhxInsutczd0ZtBzs85U8nI9RtRy
X6zLj9PzkjGMbQzRrKgB2tzr909VZjG). Timestamp by third party at
2020.09.18 10:16:58 CEST
8
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
TERVEYDEN JA HYVINVOINNIN LAITOS (THL), established in MANNERHEIMINTIE 166,
HELSINKI 00271, Finland, VAT number: FI22295006, (‘the beneficiary’), represented for the
purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘10’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-996697893_75_210--]
Markku Tervahauta with ECAS id n002iyzh signed in the Participant
Portal on 10/09/2020 at 06:31:36 (transaction id SigId-27203-6fszkd0
qczqzvb54q1yfVEIEBOrxTwuzkf8RLdzU0mSDfh0W8VVwqgZQcXhxzz
pzVHEj6CBZpdRqQ3eZVmcAxzaDm-jpJZscgsw0KXrgu252HNQS-OUh
mWoLUBBfmAlBzeMKVg0C4tkIfAW1omUqavLzODzVAlkF4k1ykwSCO
TEaUQX8i78frLGSD8FnVb2sjrjo4DR0). Timestamp by third party at
2020.09.10 07:31:48 CEST
9
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
AGENCE NATIONALE DE LA SECURITE SANITAIRE DE L ALIMENTATION DE L
ENVIRONNEMENT ET DU TRAVAIL (ANSES), established in 14 RUE PIERRE ET MARIE
CURIE, MAISONS ALFORT 94700, France, VAT number: FR54130012024, (‘the beneficiary’),
represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘11’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-983552356_75_210--]
Roger GENET with ECAS id nmortuma signed in the Participant
Portal on 17/09/2020 at 13:13:14 (transaction id SigId-86288-m4GBD
vOgRtOaM6wGgUW83A3iZQ0TTbkU1nwzXeoxo0d8zNfjih3NRSPIFSJ
XgDUSmzbhErSa3kdKrrdLuzHmwwy-jpJZscgsw0KXrgu252HNQS-Lu5
ryA9zgfw02d8FpGoSHn45qXzNkS7o2K3W7wwMmiN8zsnObTIEsh44
CV8zvppJ5gkFEp4KFPWVbB3CjUzJH24). Timestamp by third party at
2020.09.17 14:13:21 CEST
10
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MAX RUBNER INSTITUT BUNDESFORSCHUNGSINSTITUT FUR ERNAEHRUNG UND
LEBENSMITTEL (MRI), established in HAID UND NEU STRASSE 9, KARLSRUHE 76131,
Germany, VAT number: DE811393840, (‘the beneficiary’), represented for the purpose of signing this
Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘12’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-998318084_75_210--]
Pablo Steinberg with ECAS id n002uzcy signed in the Participant
Portal on 04/09/2020 at 17:34:53 (transaction id SigId-23087-twowII
V6LRs5kv55pQNzGpZ8RFyhPMMOdA14CJInxLBoc1dVnTain5U2Uhh
We2wFVOd5zLb0CweFfQzxHvM8yN0-rS0vSrmBGYC8zfwLQLD1Ks-W
rfEenApzVcJOMyqeCx9GTkqvx8bzM9LpzwDMoZ8XpDWfLzjlvqCiw9O
SGAXqZXAHEsZc7Fwje8Duf4weVsco0G). Timestamp by third party at
2020.09.04 18:35:00 CEST
11
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
INSTITOUTON YGEIAS TOU PAIDIOU (ICH), established in THIVON KAI LIVADIAS,
ATHINA 11527, Greece, VAT number: EL090073098, (‘the beneficiary’), represented for the purpose
of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘13’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-998867977_75_210--]
CHRISTINA KANAKA GANTENBEIN with ECAS id n00432h1 signed in
the Participant Portal on 18/09/2020 at 06:54:32 (transaction id SigId-
91403-qeSJAux3w38OwO6jE7ljMRCf1Ej4Olb3811R18Tj1f3ZUhPq1LM7
hRqjCOCXANDOUokP1oXpnkLgDBzvZkzPuY-
jpJZscgsw0KXrgu252HNQS-zVMocCo5LSXu3kmBJu8qgaurDFOsSyvOj8
AgIt6IjPQk07bjRsCSCGtwdnRA4tcKQ1TmlALXoK3WBvzPzVPrG50).
Timestamp by third party at
2020.09.18 07:54:38 CEST
12
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SEMMELWEIS EGYETEM (SU), established in ULLOI UTCA 26, BUDAPEST 1085, Hungary,
VAT number: HU15329808, (‘the beneficiary’), represented for the purpose of signing this Accession
Form by the undersigned,
hereby agrees
to become beneficiary No (‘14’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-999860675_75_210--]
Béla Dr. Merkely with ECAS id n002coer signed in the Participant
Portal on 18/09/2020 at 13:01:56 (transaction id SigId-96586-mMrQ6
Nn3Z1BqiBdIk2pdb7NURbHxiph38L2yYI2X42dP9XchVDnA9Y0HIIP4
H865aVTVpeOasRRc81k5IwU3TG-jpJZscgsw0KXrgu252HNQS-A9bFW
TpEoGWyyk6swkHMPHGL92OKd9kKDzXcwCUwajcDQahKfseewGMY
qs3f487IIqlfQVzkeGEk3OeaWCHREK). Timestamp by third party at
2020.09.18 15:02:10 CEST
13
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
DEPARTMENT OF HEALTH (DoH), established in Block 1, Miesian Plaza, 50 – 58 Lower Baggot
Street, Dublin D02 XW14, Ireland, (‘the beneficiary’), represented for the purpose of signing this
Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘15’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-972459824_75_210--]
Seamus O'Reilly with ECAS id n002x6eg signed in the Participant
Portal on 09/09/2020 at 18:06:30 (transaction id SigId-26069-nVDo
Ny3Ie5EiJbRnhIvW67THjCfRZNQYReeGFT0TFzy0bivczjJ8j7YzR4g4aa
oMcMftQVRRMtxQuzt9k7oCzmQ-jpJZscgsw0KXrgu252HNQS-YpYvtL
dMYbQkoUXpwzWgMwnAiJxmjCXjxzZIhNIihSDCbm8zam95DdSPqJC
zRKCEhM8zzvhzMghyRf8Z1CLh3T4q). Timestamp by third party at
2020.09.09 19:06:36 CEST
14
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
ISTITUTO SUPERIORE DI SANITA (ISS), established in Viale Regina Elena 299, ROMA 00161,
Italy, VAT number: IT03657731000, (‘the beneficiary’), represented for the purpose of signing this
Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘16’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-999978821_75_210--]
Silvio Brusaferro with ECAS id n002ocza signed in the Participant
Portal on 09/09/2020 at 08:27:55 (transaction id SigId-17777-Fgizl1
htK0oCpcQzyaLDRzWWir4NM1xjMRzpcEI2aWaUYowEM8qv2sRuOd
c7fAVb4RqKDjT2krSztsf42KtXvlw-jpJZscgsw0KXrgu252HNQS-9Nqw
bN9Hzty9w3gnNdL79tp0yRJdqzW6VnHBj0sb9zR0SqUqA9Sqomrfg8
aNx6L3rgJnskLRcyTHqNJB6zYQmja). Timestamp by third party at
2020.09.09 09:28:08 CEST
15
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SLIMIBU PROFILAKSES UN KONTROLES CENTRS (CDPC), established in Duntes 22, Riga
LV1005, Latvia, VAT number: 90009756700, (‘the beneficiary’), represented for the purpose of
signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘17’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-952714019_75_210--]
Iveta GAVARE with ECAS id ngavariv signed in the Participant
Portal on 07/09/2020 at 06:08:55 (transaction id SigId-825-erTBK5
ptzYI0HyYLbGwahUq3ffRSeu5bRqVWEqGBzIY2vSzqKbknzr60sUNS
4zYAzlhVVfW3h8zNN8r0q2OW5xNO-rS0vSrmBGYCrECthJBlyHy-TG
KgBSk95b6i3G2g4vGVlhQiD55tyzivczS66dgjmF1jktzwzkxYkPy1QoF
v0ot33LTbUNBJ7933vBegTlmS9Ce). Timestamp by third party at
2020.09.07 07:09:02 CEST
16
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
LIETUVOS RESPUBLIKOS SVEIKATOS APSAUGOS MINISTERIJA (LR SAM),
established in VILNIAUS G 33, VILNIUS LT 01506, Lithuania, (‘the beneficiary’), represented for
the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘18’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-933839468_75_210--]
Ieva GUDANAVICIENE with ECAS id ngudanie signed in the Participant
Portal on 07/09/2020 at 13:36:11 (transaction id SigId-346-xfxxUzUr0
bzr2DhKTOlDiCsNunKSBZBpBGcJt7zgSj2DasJDa8Onq3vvzx2CD2DoG
a3ygTvzR6DZxzzfeL5A1zbP-jpJZscgsw0KXrgu252HNQS-wkVtNWJJpQH
PB1WigJ3QTKEXY8czZDclmPzo7rJF99hzh9TEBOi1kyEPX9M0jdKRVQJB
tmjJDoPPE6sNDLeAGpm). Timestamp by third party at
2020.09.07 14:36:20 CEST
17
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
Ministry for Health - Government of Malta (MFH), established in Palazzo Castellania, Merchants
Street 15, Valletta VLT 200, Malta, VAT number: MT12979127, (‘the beneficiary’), represented for
the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘19’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-974144423_75_210--]
Joseph RAPA with ECAS id nraparjo signed in the Participant Portal
on 23/09/2020 at 10:48:11 (transaction id SigId-351-Ooe3E4KsgGTf
IvF7o3jmjAI7lYoPLx3mUCNkQhv6VPO0unrZvJxwwt7lGZ3MtkS6xhq
1NAA0AzucBgOQdFSvuu-rS0vSrmBGYC2bZfUddDmpq-ptl7SKdAc
M4zLIuJrpVGRb476WLmZN4cOynW7F25esdXLKzjk8zxOsrdH4MSR
7fCaa7vYHAjzzM4fPmAFIEt5rS). Timestamp by third party at
2020.09.23 11:48:17 CEST
18
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
RIJKSINSTITUUT VOOR VOLKSGEZONDHEID EN MILIEU (RIVM), established in
Antonie Van Leeuwenhoeklaan 9, BILTHOVEN 3721 MA, Netherlands, VAT number:
NL821772302B01, (‘the beneficiary’), represented for the purpose of signing this Accession Form
by the undersigned,
hereby agrees
to become beneficiary No (‘20’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-999991431_75_210--]
Johannes Brug with ECAS id n002chro signed in the Participant
Portal on 04/09/2020 at 15:47:04 (transaction id SigId-22275-zgNZY
r1AyVDJ401DngzzN6Nh9KukgxxesH3Quny19zbIlR7zi8zh7ONgqn5ci
pYavli0BS8q3dqJv0TcwAYlbeXW-rS0vSrmBGYC8zfwLQLD1Ks-9zfKEI
zravnerLXaPuLo5ErGQGzViQG8dKzzgLg8x98uHzkXkOEmLV67MAh
XvJHRuzNGXoZbVzIYpySes4vzWGxzy). Timestamp by third party at
2020.09.04 16:47:09 CEST
19
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SLASKI UNIWERSYTET MEDYCZNY W KATOWICACH (SUM), established in UL.
PONIATOWSKIEGO 15, KATOWICE 40 055, Poland, VAT number: PL6340005301, (‘the
beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘21’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-998399952_75_210--]
tomasz szczepanski with ECAS id n0038qfe signed in the Participant
Portal on 08/09/2020 at 11:37:50 (transaction id SigId-9600-0L2VWzv
Ye6UuUECkQxDUqzzeMT0PEfB1Q7aZ1aS2bAGaONGvjBF93WzYNX0
zpv7NX3Pav4BGr5eal2F1NHTiLWv-jpJZscgsw0KXrgu252HNQS-4F1uC
Qw7Ynibq9StxnaUwRyOovEk5YswvtZwzwD0xiNSevzXugcQynda73ys
9rqb1yCUPGLQQRFUD9fzMuDQJg0). Timestamp by third party at
2020.09.08 12:38:01 CEST
20
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTERIO DA SAUDE - REPUBLICA PORTUGUESA (DGS), established in Av. João
Crisóstomo, 9, LISBOA 1049-062, Portugal, (‘the beneficiary’), represented for the purpose of
signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘22’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-986364095_75_210--]
Graça Freitas with ECAS id n0020y7u signed in the Participant
Portal on 10/09/2020 at 12:15:35 (transaction id SigId-31715-upFb
DEKJ6H64grszqIPxp9XMpA8WF7xd5C4hZ8B54OWkXS7EhYBIA4kh
7FanBntwx3s7zrYa5qfzHd5uO3QrCsW-jpJZscgsw0KXrgu252HNQS-
sFEcszTNyzTrFpF56bap3M5emtzzjXlGigXLiit4yd5iqOWTzZpA7eEof
gbsyIrtsG0RdaAZfeweYKBOVukdnNF). Timestamp by third party at
2020.09.10 13:15:47 CEST
21
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
INSTITUTUL NATIONAL DE SANATATE PUBLICA (NIPH), established in STR DR LEONTE
1-3 SECTOR 5, BUCURESTI 050463, Romania, (‘the beneficiary’), represented for the purpose of
signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘23’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-985926237_75_210--]
Alexandra CUCU with ECAS id ncucuale signed in the Participant
Portal on 16/09/2020 at 13:54:49 (transaction id SigId-75848-82Mc2
jksqcsJSCzH7nEHVsTLcQR7ICvsb7nszpKmtKrlbek6WhFgAWo7lORHr
sZGQ29ZDKeozPzRY6csnIazuwzW-jpJZscgsw0KXrgu252HNQS-hrguz
t6GQryZEeSJe1Xwo3NmMo0ZlpkxZzkCxbRtkVMo1IW8uFELSFv9Lzu
n4kPt5zXUfzgmpTNKlCjXj7zlYFOG). Timestamp by third party at
2020.09.16 14:57:55 CEST
22
Grant Agreement number: 951202 — Best-ReMaP
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
INSTITUT ZA ZASTITU ZDRAVLJA SRBIJEDR MILAN JOVANOVIC BATUT (IPHS),
established in DR SUBOTICA STREET 5, BEOGRAD 11000, Serbia, VAT number: RS102000930,
(‘the beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘24’)
in Grant Agreement No 951202 (‘the Grant Agreement’)
between NACIONALNI INSTITUT ZA JAVNO ZDRAVJE and the Consumers, Health, Agriculture
and Food Executive Agency (CHAFEA) ('the Agency'), under the powers delegated by the European
Commission ('the Commission'),
for the action entitled Joint Action on Implementation of Validated Best Practices in Nutrition (Best-
ReMaP).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-941063349_75_210--]
Verica JOVANOVIC with ECAS id njovveri signed in the Participant
Portal on 07/09/2020 at 13:52:57 (transaction id SigId-603-PwcaekA
MFHDON37KzzIYdd7a3afUIVpzaznrxdE1mKYB8dVoE9UkfzNYNyrlB
MAZBkhk1m5GnNPRUnrFrJfPAwR-jpJZscgsw0KXrgu252HNQS-Cx3u
7309GHYNTrhBPb6R7KXx9LpqeVRvdEhwd7rzefmFdYkzLmWzzHZH
zlMxodT8IfKxX0IAZxMfh8qNngLlV66). Timestamp by third party at
2020.09.07 14:53:03 CEST
23
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
i print format A4
MODEL ANNEX 4 CHAFEA MGA — MULTI
landscape
FINANCIAL STATEMENT FOR [BENEFICIARY [name]/AFFILIATED ENTITY [name]] FOR REPORTING PERIOD [reporting period]
1 Receipts EU contribution
Eligible costs (per budget category)
Financial
contributions Reimburseme Maximum EU
A. Direct personnel B. Direct costs of C. Other direct 2 Income generated Requested EU
D. Indirect costs Total costs given by third Total receipts 3 4
costs subcontracting costs by the action nt rate % constribution contribution
parties to the
beneficiaries
A.1 Employees (or
C.1 Travel
equivalent)
A.2 Natural persons
C.2 Equipment
under direct contract
and seconded persons
C.3 Other goods and
services
6
5 Actual Actual Actual Flat-rate
Cost form
7%
d= e=
a b c f g h= f + g i j k
0,07 * (a + b + c) a+ b + c + d
[short name beneficiary
/ affiliated entity]
The beneficiary/affiliated entity hereby confirms that:
The information provided is complete, reliable and true.
The costs declared are eligible (see Article 6).
The costs can be substantiated by adequate records and supporting documentation that will be produced upon request or in the context of checks, reviews, audits and investigations (see Articles 12, 13 and 17).
For the last reporting period: that all the receipts have been declared (see Article 5.3.3).
i Please declare all eligible costs, even if they exceed the amounts indicated in the estimated budget (see Annex 2). Only amounts that were declared in your individual financial
statements can be taken into account lateron, in order to replace other costs that are found to be ineligible.
1
See Article 6 for the eligibility conditions.
2
The indirect costs claimed must be free of any amounts covered by an operating grant (received under any EU or Euratom funding programme). A beneficiary that receives an operating grant during the duration of the action cannot
claim any indirect costs for the year(s) covered by the operating grant (see Article 6.2.D).
3
See Article 5.2 for the reimbursement rate
4
This is the theoretical amount of EU contribution that the system calculates automatically (by multiplying the reimbursement rate by the total costs declared). The amount you request (in the column 'requested EU contribution') may
have to be less.
5
See Article 5 for the cost forms.
6
Flat rate : 7% of eligible direct costs.
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
ANNEX 5
MODEL FOR THE CERTIFICATE ON THE FINANCIAL STATEMENT (CFS)
This document sets out:
- the objectives and scope of the independent report of factual findings on costs declared
under a EU grant agreement financed under the Health Programme (2014-2020) or
Consumer Programme (2014-2020) and
- a model for the certificate on the financial statement (CFS).
1. Background and subject matter
[OPTION 1 for actions with one RP and NO interim payments: Within 60 days of the end of
the reporting period, the coordinator must submit to the Commission a final report, which
should include (among other documents and unless otherwise specified in Article 15 of the
Grant Agreement) a certified financial statement (CFS; see proposed model below) for each
beneficiary and (if applicable) each affiliated entity, if:
- it requests an EU contribution of EUR 150 000 or more as reimbursement of actual
costs and
- the maximum EU contribution indicated for that beneficiary/affiliated entity in the
estimated budget (see Annex 2) as reimbursement of actual costs is EUR 200 000 or
more.]
[OPTION 2 for actions with several RPs and interim payments: Within 60 days of the end
of each reporting period, the coordinator must submit to the Commission a periodic report,
which should include (among other documents and unless otherwise specified in Article 15 of
the Grant Agreement) a certified financial statement (CFS; see proposed model below) for
each beneficiary and (if applicable) each affiliated entity, if:
- the cumulative amount of EU contribution the beneficiary/affiliated entity requests as
reimbursement of actual costs is EUR 150 000 or more and
- the maximum EU contribution indicated for that beneficiary/affiliated entity in the
estimated budget (see Annex 2) as reimbursement of actual costs is EUR 200 000 or
more.
The CFS must be submitted every time the cumulative amount of payments requested (i.e.
including in previous financial statements) reaches the threshold (i.e. a first certificate once
the cumulative amount reaches 150 000, a second certificate once it reaches 300 000, a third
certificate once it reaches 450 000, etc.).
Once the threshold is reached, the CFS must cover all reporting periods for which no
certificate has yet been submitted.]
1
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
The beneficiary must provide the CFS for itself and, if applicable, for its affiliated entity(ies).
The purpose of the audit on which the CFS is based is to give the Agency ‘reasonable
assurance’1 that costs declared as eligible costs under the grant (and, if relevant, receipts
generated in the course of the action) are being claimed by the beneficiary in accordance with
the relevant legal and financial provisions of the Grant Agreement.
The scope of the audit is limited to the verification of eligible costs included in the CFS. The
audit must be conducted in line with point 3 below.
Certifying auditors must carry out the audits in compliance with generally accepted audit
standards and indicate which standards they have applied. They must bear in mind that, to
establish a CFS, they must carry out a compliance audit and not a normal statutory audit. The
eligibility criteria in the Grant Agreement always override normal accounting practices.
The beneficiary and the auditor are expected to address any questions on factual data or
detailed calculations before the financial statement and the accompanying certificate are
submitted. It is also recommended that the beneficiary take into account the auditor’s
preliminary comments and suggestions in order to avoid a qualified opinion or reduce the
scope of the qualifications.
Since the certificate is the main source of assurance for cost claims and payments, it will be
easier to consider amounts as eligible if a non-qualified certificate is provided.
The submission of a certificate does not affect the Agency’s right to carry out its own
assessment or audits. Neither does the reimbursement of costs covered by a certificate
preclude the Agency or the Commission, the European Anti-Fraud Office or the European
Court of Auditors from carrying out checks, reviews, audits and investigations in accordance
with Article 17 of the Grant Agreement.
The Agency expects the certificates to be issued by auditors according to the highest
professional standards.
2. Auditors who may deliver a certificate
The beneficiary is free to choose a qualified external auditor, including its usual external
auditor, provided that:
- the external auditor is independent from the beneficiary and
- the provisions of Directive 2006/43/EC2 are complied with.
1
This means a high degree of confidence.
2
Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of
annual accounts and consolidated accounts or similar national regulations (OJ L 157, 9.6.2006, p. 87).
2
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Independence is one of the qualities that permit the auditor to apply unbiased judgement and
objective consideration to established facts to arrive at an opinion or a decision. It also means
that the auditor works without direction or interference of any kind from the beneficiary.
Auditors are considered as providing services to the beneficiary/affiliated entity under a
purchase contract within the meaning of Article 9 of the Grant Agreement. This means that
the costs of the CFS may normally be declared as costs incurred for the action, if the cost
eligibility rules set out in Articles 6 and 9.1.1 of the Grant Agreement are fulfilled (especially:
best value for money and no conflict of interests; see also below eligibility of costs of other
goods and services). Where the beneficiary/affiliated entity uses its usual external auditor, it is
presumed that they already have an agreement that complies with these provisions and there is
no obligation to find new bids. Where the beneficiary/affiliated entity uses an external auditor
who is not their usual external auditor, it must select an auditor following the rules set out in
Article 9.1.1.
Public bodies can choose an external auditor or a competent public officer. In the latter case,
the auditor’s independence is usually defined as independence from the audited beneficiary
‘in fact and in appearance’. A preliminary condition is that this officer was not involved in
any way in drawing up the financial statements. Relevant national authorities establish the
legal capacity of the officer to carry out audits of that specific public body. The certificate
should refer to this appointment.
3. Audit methodology and expected results
3.1 Verification of eligibility of the costs declared
The auditor must conduct its verification on the basis of inquiry and analysis,
(re)computation, comparison, other accuracy checks, observation, inspection of records and
documents and by interviewing the beneficiary (and the persons working for it).
The auditor must examine the following documentation:
the Grant Agreement and any amendments to it;
the periodical and/or final report(s);
for personnel costs
o salary slips;
o time sheets;
o contracts of employment;
o other documents (e.g. personnel accounts, social security legislation, invoices,
receipts, etc.);
o proofs of payment;
for subcontracting
o the call for tender;
o tenders (if applicable);
o justification for the choice of subcontractor;
o contracts with subcontractors;
o invoices;
o declarations by the beneficiary;
o proofs of payment;
3
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
o other documents: e.g. national rules on public tendering if applicable, EU
Directives, etc.;
for travel and subsistence costs
o the beneficiary’s internal rules on travel;
o transport invoices and tickets (if applicable);
o declarations by the beneficiary;
o other documents (proofs of attendance such as minutes of meetings, reports,
etc.);
o proofs of payment;
for equipment costs
o invoices;
o delivery slips / certificates of first use;
o proofs of payment;
o depreciation method of calculation;
for costs of other goods and services
o invoices;
o proofs of payment; and
o other relevant accounting documents.
General eligibility rules
The auditor must verify that the costs declared comply with the general eligibility rules set out
in Article 6.1 of the Grant Agreement.
In particular, the costs must:
be actually incurred;
be linked to the subject of the Grant Agreement and indicated in the beneficiary's
estimated budget (i.e. the latest version of Annex 2);
be necessary to implement the action which is the subject of the grant;
be reasonable and justified, and comply with the requirements of sound financial
management, in particular as regards economy and efficiency;3
have been incurred during the action, as defined in Article 3 of the Grant Agreement
(with the exception of the invoice for the audit certificate and costs relating to the
submission of the final report);
not be covered by another EU or Euratom grant (see below ineligible costs);
be identifiable, verifiable and, in particular, recorded in the beneficiary's accounting
records and determined according to the applicable accounting standards of the
country where it is established and its usual cost-accounting practices;
comply with the requirements of applicable national laws on taxes, labour and social
security;
be in accordance with the provisions of the Grant Agreement (see, in particular,
Articles 6 and 9-11a) and
have been converted to euro at the rate laid down in Article 15.6 of the Grant
Agreement:
3
To be assessed in particular on the basis of the procurement and selection procedures for service providers.
4
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
o for beneficiaries with accounts established in a currency other than the euro:
Costs incurred in another currency must be converted into euros at the average
of the daily exchange rates published in the C series of the EU Official Journal
determined over the corresponding reporting period.
If no daily euro exchange rate is published in the EU Official Journal for the
currency in question, the rate used must be the average of the monthly
accounting rate established by the Commission and published on its website;
o for beneficiaries with accounts established in euro:
Costs incurred in another currency should be converted into euros applying the
beneficiary’s usual accounting practice.
The auditor must verify whether expenditure includes VAT and, if so, verify that the
beneficiary:
- cannot recover the VAT (this must be supported by a statement from the competent
body) and
- is not a public body acting as a public authority.
The auditor should base his/her audit approach on the confidence level following a review of
the beneficiary's internal control system. When using sampling, the auditor should indicate
and justify the sampling size.
Specific eligibility rules
In addition, the auditor must verify that the costs declared comply with the specific cost
eligibility rules set out in Article 6.2 and Articles 9.1.1, 10.1.1, 11.1.1, 11a.1.1 and 11a.2.1 of
the Grant Agreement.
Personnel costs
The auditor must verify that:
personnel costs have been charged and paid in respect of the actual time devoted by
the beneficiary’s personnel to implementing the action (justified on the basis of time
sheets or other relevant time-recording system);
personnel costs were calculated on the basis of annual gross salary, wages or fees (plus
obligatory social charges, but excluding any other costs) specified in an employment
or other type of contract, not exceeding the average rates corresponding to the
beneficiary’s usual policy on remuneration;
the work was carried out during the period of implementation of the action, as defined
in Article 3 the Grant Agreement and
the personnel costs are not covered by another EU or Euratom grant (see below
ineligible costs);
for additional remunerations: the 2 conditions set out in Article 6.2.A.1 are met (i.e.
that it is part of the beneficiary’s usual remuneration practices and is paid in a
consistent manner whenever the same kind of work or expertise is required and that
the criteria used to calculate the supplementary payments are objective and generally
applied by the beneficiary, regardless of the source of funding used);
for in-house consultants: the 3 conditions set out in Article 6.2.A.2 of the Grant
Agreement are met (i.e. that the in-house consultant works under the beneficiary’s
5
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
instructions, that the result of the work carried out belongs to the beneficiary, and that
the costs are not significantly different from those for personnel performing similar
tasks under an employment contract).
The auditor should have assurance that the management and accounting system ensures
proper allocation of the personnel costs to various activities carried out by the beneficiary and
funded by various donors.
Subcontracting costs
The auditor must verify that:
the subcontracting complies with best value for money (or lowest price) and that there
was no conflict of interests;
the subcontracting was necessary to implement the action for which the grant is
requested;
the subcontracting was provided for in Annex 1 and Annex 2 or agreed to by the
Agency at a later stage;
the subcontracting is supported by accounting documents in accordance with national
accounting law
public bodies have complied with the national rules on public procurement.
Travel and subsistence costs
The auditor must verify that travel and subsistence costs:
have been charged and paid in accordance with the beneficiary's internal rules or usual
practices;
are not covered by another EU or Euratom grant (see below ineligible costs);
were incurred for travels linked to action tasks set out in Annex 1 of the Grant
Agreement.
Equipment costs
The auditor must verify that:
the equipment is purchased, rented or leased at normal market prices;
public bodies have complied with the national rules on public procurement;
the equipment is written off, depreciation has been calculated according to the tax and
accounting rules applicable to the beneficiary and only the portion of the depreciation
corresponding to the duration of the action has been declared and
the costs are not covered by another EU or Euratom grant (see below ineligible costs).
Costs of other goods and services
The auditor must verify that:
the purchase complies with best value for money (or lowest price) and that there was
no conflict of interests;
public bodies have complied with the national rules on public procurement;
the costs are not covered by another EU or Euratom grant (see below ineligible costs).
6
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Ineligible costs
The auditor must verify that the beneficiary has not declared any costs that are ineligible
under Article 6.4 of the Grant Agreement:
costs relating to return on capital;
debt and debt service charges;
provisions for future losses or debts;
interest owed;
doubtful debts;
currency exchange losses;
bank costs charged by the beneficiary’s bank for transfers from the Agency;
excessive or reckless expenditure;
deductible VAT;
VAT incurred by a public body acting as a public authority;
costs incurred during suspension of the implementation of the action;
in-kind contributions from third parties;
costs declared under other EU or Euratom grants (including those awarded by a
Member State and financed by the EU or Euratom budget or awarded by bodies other
than the Agency for the purpose of implementing the EU or Euratom budget); in
particular, indirect costs if the beneficiary is already receiving an operating grant
financed by the EU or Euratom budget in the same period;
costs incurred for permanent staff of a national administration for activities that are
part of its normal activities (i.e. not undertaken only because of the grant);
costs incurred for staff or representatives of EU institutions, bodies or agencies.
3.2 Verification of receipts
The auditor must verify that the beneficiary has declared receipts within the meaning of
Article 5.3.3 of the Grant Agreement, i.e.:
income generated by the action (e.g. from the sale of products, services and
publications, conference fees) and
financial contributions given by third parties, specifically to be used for costs that are
eligible under the action.
3.3 Verification of the beneficiary’s accounting system
The auditor must verify that:
the accounting system (analytical or other suitable internal system) makes it possible
to identify sources of financing for the action and related expenses incurred during
the contractual period and
expenses/income under the grant have been recorded systematically using a
numbering system that distinguishes them from expenses/income for other projects.
7
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
Certificate on the financial statement (CFS)
To
[Beneficiary/affiliated entity’s full name
address]
We, [full name of the audit firm/organisation], established in [full address/city/country],
represented for signature of this audit certificate by [name and function of an authorised
representative],
hereby certify
that:
1. We have conducted an audit relating to the costs declared in the financial statement of
[name of beneficiary/affiliated entity] (the [‘beneficiary’][‘affiliated entity’]), to which
this audit certificate is attached and which is to be presented to the Consumers, Health,
Agriculture and Food Executive Agency under Grant Agreement No [insert number] —
[insert acronym], covering costs for the following reporting period(s): [insert reporting
period(s)].
2. We confirm that our audit was carried out in accordance with generally accepted
auditing standards in compliance with ethical rules and on the basis of the provisions of
the Grant Agreement and its Annexes (and in particular the audit methodology
described in Annex 5).
3. The financial statement was examined and all necessary tests of [all][[X]%] of the
supporting documentation and accounting records were carried out in order to obtain
reasonable assurance that, in our opinion and on the basis of our audit
total costs of EUR [insert number] ([insert amount in words]) are eligible, i.e.:
actual;
determined in accordance with the [beneficiary’s][affiliated entity’s]
accounting principles;
incurred during the period referred to in Article 3 of the Grant Agreement;
recorded in the [beneficiary’s][affiliated entity’s] accounts (at the date of this
audit certificate);
comply with the specific eligibility rules in Article 6.2 of the Grant Agreement;
do not contain costs that are ineligible under Article 6.4 of the Grant
Agreement, in particular:
costs relating to return on capital;
debt and debt service charges;
provisions for future losses or debts;
interest owed;
doubtful debts;
currency exchange losses;
8
Associated with document Ref. Ares(2020)4587976 - 03/09/2020
bank costs charged by the [beneficiary’s][affiliated entity’s] bank for
transfers from the Agency;
excessive or reckless expenditure;
deductible VAT;
VAT incurred by a public body acting as a public authority;
costs incurred during suspension of the implementation of the action;
in-kind contributions provided by third parties;
costs declared under other EU or Euratom grants (including those
awarded by a Member State and financed by the EU or Euratom budget
or awarded by bodies other than the Agency for the purpose of
implementing the EU or Euratom budget); in particular, indirect costs if
the [beneficiary][affiliated entity] is already receiving an operating
grant financed by the EU or Euratom budget in the same period;
costs incurred for permanent staff of a national administration, for
activities that are part of its normal activities (i.e. not undertaken only
because of the grant);
costs incurred for staff or representatives of EU institutions, bodies or
agencies;
[are claimed according to the euro conversion rate referred to in Article 15.6 of
the Grant Agreement;]
total receipts of EUR [insert number] ([insert amount in words]) have been declared
under Article 5.3.3 of the Grant Agreement and
the [beneficiary’s][affiliated entity’s] accounting procedures are in compliance with
the accounting rules of the state in which it is established and permit direct
reconciliation of the costs incurred for the implementation of the action covered by the
EU grant with the overall statement of accounts relating to its overall activity.
[However, our audit opinion is qualified for:
costs of EUR [insert number]
receipts of EUR [insert number]
which in our opinion do not comply with the applicable rules.]
4. We are qualified/authorised to deliver this audit certificate [(for additional information,
see appendix to this certificate)].
5. The [beneficiary][affiliated entity] paid a price of EUR [insert number]) (including VAT
of EUR [insert number]) for this audit certificate. [OPTION 1: These costs are eligible
(i.e. incurred within 60 days of the end of the action referred to in Article 3 of the Grant
Agreement) and included in the financial statement.][OPTION 2: These costs were not
included in the financial statement.]
Date, signature and stamp
9
Digitally sealed by the European Commission
Date: 2020.09.03 15:55:14 CEST
This electronic receipt is a digitally signed version of the document submitted by your
organisation. Both the content of the document and a set of metadata have been digitally
sealed.
This digital signature mechanism, using a public-private key pair mechanism, uniquely
binds this eReceipt to the modules of the Funding & Tenders Portal of the European
Commission, to the transaction for which it was generated and ensures its full integrity.
Therefore a complete digitally signed trail of the transaction is available both for your
organisation and for the issuer of the eReceipt.
Any attempt to modify the content will lead to a break of the integrity of the electronic
signature, which can be verified at any time by clicking on the eReceipt validation
symbol.
More info about eReceipts can be found in the FAQ page of the Funding & Tenders
Portal.
(https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/support/faq)
Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. +32 22991111