Estonian EU external border programme
2014-2020
Project No: ER15
Project full name: Improvement of housing energy
performance level of public buildings
through introducing innovative technologies
and solutions in Estonia and
Pskov region
Project acronym: SaveSmart
Project Partner Name (LP/PP): Tartu Regional Energy Agency
(Lead Partner)
Thematic objective: TO 6 Environmental protection, climate
change mitigation and adaptation
Audit No: EVP-7/2022
Final audit report
29/11/2022
SUMMARY OF AUDIT RESULTS
Audit outcome:
Based on the audit work performed, the auditors have obtained reasonable assurance that the
expenditure declared is in all material aspects legal and regular and in compliance with the programme
rules.
Audit opinion1:
➢ no findings.
The project audit has been carried out in compliance with the International Standards for the Professional Practice
of Internal Auditing.
We wish to thank the auditee for the assistance and cooperation provided during the audit.
We confirm that the final audit report consists of six (6) pages.
1
Significant findings are those that have or may have a financial impact (i.e. ineligible expenditure). Non-significant findings are those that have no financial
impact but whose correction will help the beneficiary to lower risks while implementing the project.
2
TABLE OF CONTENTS
SUMMARY OF AUDIT RESULTS .............................................................................................................................. 2
TABLE OF CONTENTS ............................................................................................................................................ 3
PART A .................................................................................................................................................................. 4
1. AUDIT OBJECT AND AUDITED EXPENSES ..................................................................................................... 4
2. LIMITATIONS ......................................................................................................................................... 5
PART B .................................................................................................................................................................. 6
AUDIT FINDINGS ...................................................................................................................................... 6
3
PART A
1. Audit object and audited expenses
1.1 GENERAL INFORMATION ABOUT THE AUDIT
Project name: Improvement of housing energy performance level of public
buildings through introducing innovative technologies and
solutions in Estonia and Pskov region
Project acronym: SaveSmart
Project number: ER15
Strategic and thematic objective: TO 6 Environmental protection, climate change mitigation and
adaptation
Beneficiary audited (LP/PP): Tartu Regional Energy Agency (Lead Partner)
Contact person of the beneficiary: Ms. Nele Ivask
Date of subsidy contract: 28/05/2019
Audit scope and period: 01/07/2021 – 30/06/2022
1.2 INFORMATION ABOUT THE AUDIT
Basis: - Agreement on financing and implementation of Cross-
Border Cooperation Programme “Estonia-Russia” 2014-
2020.
- Audit Authority’s work plan for 2022.
Objective: To provide an audit opinion that:
- the operation was selected in accordance with the
selection criteria for the cross-border programme.
- the expenditure declared to the participating nations and
the Commission corresponds to the accounting records
and that the required supporting documentation
demonstrates an adequate audit trail.
- for expenditure declared to the participating nations and
the Commission, outputs and results underpinning
payments to the beneficiary have been delivered.
Person carrying out the audit: Mart Pechter, advisor of the Financial Control Department
Audit duration: 13/09/2022 – 29/11/2022
Methodology: Audit manual of the Estonia-Russia Programme
Audit procedures performed at the During the on-the-spot check, interviews were conducted with
beneficiary audited: the persons involved in project implementation and
analysis/evaluation was made of the following:
- project’s actual implementation.
4
- documentation related to project implementation.
- eligibility of costs.
- arrangement of book-keeping related to the project.
- existence of co-financing.
- use of the logos.
Sampling methodology (if applicable, then - population size.
information shall be provided by the Audit
- sampling steps or method.
Authority):
- sample size before and after expansion (if applicable) and
final audited total amount.
1.3 AUDITED EXPENSES
Total amount of certified expenses subject Report 3.1
to auditors’ opinion based on cost
Period 3 01.06.2020 - 30.11.2020
documents:
€16 577.92
Size of the sample (EUR; %)2: €16 577.92, 100%
Ineligible expenditure identified (EUR): amount
National
EU Private sector
public Total
contribution contribution
contribution
Ineligible amount (EUR): 0.00 0.00 0.00 0.00
Ineligible amount outside the audit scope 0.00 0.00 0.00 0.00
(EUR):
Error rate (%)3: 0.00%
2. Limitations
The audit procedures were carried out in compliance with internationally accepted auditing standards4 and the audit
report was prepared using the principles of independence and objectivity.
Auditors conclude that all data presented during the audit and other oral and written information made available
during the audit presents a true and fair view of the activities performed during the project implementation and are
sufficient to provide an opinion about the project. In case of additional information that was not provided or was not
known to auditors, the conclusions reached by auditors might have been different.
2 If a sample was not used for auditing, the size of the sample is the total population in euros and the share of audited expenses to total population is 100%.
3
Share of ineligible expenses to audited expenses (%). If a sample was used for auditing, the share of ineligible expenses to the sample size shall be used.
4 The International Professional Practices Framework (IPPF) of the Institute of Internal Auditors.
5
PART B
AUDIT FINDINGS
1. Use of funding as intended
The funding has been used in material aspects in the intended manner, in a reasonable and efficient way and in
accordance with the objectives and requirements laid down in the subsidy contract and the programme manual.
2. Accuracy of book-keeping records
The book-keeping records for the project are in all material aspects in compliance with the current legislation.
3. Amount and timing of funding
The granting of funding has in all material aspects been made available in the amount foreseen and on time, and the
co-financing has been guaranteed.
4. Carrying out of public procurements
The beneficiary has in all material aspects carried out public procurements in compliance with the current legislation.
5. Granting of state aid
The project does not involve state aid.
6. Communication and publicity
When informing and disclosing the use of funding, the beneficiary has in all material aspects followed the current
legislation.
We confirm that the final audit report has six (6) pages.
Audit manager: Audit supervisor:
Name Mart Pechter Name Kaur Siruli
Profession Advisor Profession Head of Department
Tallinn, 29/11/2022
6
Hr Martin Kikas
Tartu Regiooni Energiaagentuur Meie 30.11.2022 nr 10-5/9469-1
[email protected]
Auditi lõpparuande edastamine
Austatud härra direktor
Edastame Teile projekti „SaveSmart“ (nr ER15) partneri Tartu Regiooni Energiaagentuur
projektiauditi lõpparuande.
Täname Teid auditi jooksul üles näidatud abi ja koostöö eest.
Lugupidamisega
(allkirjastatud digitaalselt)
Kaur Siruli
Finantskontrolli osakonna juhataja
Auditeeriva asutuse juht
Lisa: Auditi lõpparuanne kuuel (6) leheküljel
Sama:
Pr Imbi Uusjärv, Riigi Tugiteenuste Keskus (
[email protected])
Pr Ege Ello, Riigi Tugiteenuste Keskus (
[email protected])
Mart Pechter 611 3152
[email protected]
Suur-Ameerika 1 / 10122 Tallinn / 611 3558 /
[email protected] / www.rahandusministeerium.ee
registrikood 70000272