dokumendiregister.ee
Väljaminev kiriAvalik

Järelepärimine

Tarbijakaitse ja Tehnilise Järelevalve Amet · 15. august 2013
Viit
13-1536-002
Registreeritud
15. august 2013
Dokumendi liik
Väljaminev kiri
Adressaat
State railway inspectorate under the Ministry of Transport and communications of Lithuania
Funktsioon
6.3S Raudteeliiklusregistri ja -ehitisregistri dokumendid (2009-2013) (Suletud)
Sari
6.3-6 Ehitisregistriga seonduvad dokumendid (va käskkirjad)
Toimik
13-1536
Vastutaja
TJA Migratsioon (Raudteeinfrastruktuuri osakond)

Failid

Sisu (failidest)

Saatja: Mati Räli </O=MAJANDUS-TEEDE-SIDEMINISTEERIUM/OU=FIRST ADMINISTRATIVE GROUP/CN=RECIPIENTS/CN=MATI.RALI> Saaja: '[email protected]' Teema: About level crossing warning time lengths (Answer to Your 30.07.2013 request) Dear Ms Navickaite. In Estonia are at moment used only level crossing signalling systems with fixed pre-warning area lengths. Calculatuing method of lengths depends from allowed maximum speed on certain track. According our information, Estonian railway undertakers have not planned to use different equipmebnty, however, it can be actual, if ERTMS is applied for some network parts. Actual used train- and trackside devices do nopt fulfill higher requirements for data accuracy which are needed for safety-critical objects like level crossings. If You have additional questions regarding this topic, please do not hesitate to contact us. With kind regards, Mati Räli Estonian Technical Surveillance Authority -----Original Message----- From: [email protected] [mailto:[email protected]] Sent: Tuesday, July 30, 2013 8:36 AM To: TJA - Avalik Subject: Tagasiside kodulehelt First name:: Martyna Surname:: Navickaite Corporate body:: STATE RAILWAY INSPECTORATE UNDER THE MINISTRY OF TRANSPORT AND COMMUNICATIONS Address:: Gelezinio Vilko str. 18A, Vilnius, Lithuania Postal code:: LT-08104 Phone:: Fax:: E-mail:: [email protected] Content:: Dear Sir / Madam, I am writing in order to learn about the system of installing signaling of level crossings in your country. I am keen to know how does the duration of red light signal for level crossing users is calculated. Is there any technology that determines the duration of red light signal that corresponds to factual train speed? At the moment in Lithuania the duration of red light signal is calculated according to the maximum allowed speed of train on the line. Therefore LT NSA is looking for more sophisticated level crossing systems in Europe that would allow to determine the duration of red light signal according to the factual train speed on the line. This would allow for car drivers to spend less time at the level crossings while waiting for passing trains. I look forward to receiving your replay Kind regards quest for information:: by e-mail http://www.tja.ee/index.php?id=11701 | 192.168.4.15
Allikas: Tarbijakaitse ja Tehnilise Järelevalve Amet dokumendiregister →