dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Terviseamet
MajanduslepingAvalik

Leping

Terviseamet · 8. oktoober 2024
Viit
4.2-3/1196
Registreeritud
8. oktoober 2024
Dokumendi liik
Majandusleping
Funktsioon
4 Vara arvestus ja haldustegevuse korraldamine
Sari
4.2-3 Majandus- ja koostöölepingud
Toimik
4.2-3/2024
Vastutaja
Stella Ilves (TA, Peadirektori vastutusvaldkond, Üldosakond)

Failid

  • 📎Grant Agreement - GAP-101140460.pdf12898 KB

Sisu (failidest)

Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 EUROPEAN HEALTH AND DIGITAL EXECUTIVE AGENCY (HADEA) Director GRANT AGREEMENT Project 101140460 — EU-WISH PREAMBLE This Agreement (‘the Agreement’) is between the following parties: on the one part, the European Health and Digital Executive Agency (HADEA) (‘EU executive agency’ or ‘granting authority’), under the powers delegated by the European Commission (‘European Commission’), and on the other part, 1. ‘the coordinator’: STATENS SERUM INSTITUT (SSI), PIC 999937402, established in ARTILLERIVEJ 5, KOBENHAVN S 2300, Denmark, and the following other beneficiaries, if they sign their ‘accession form’ (see Annex 3 and Article 40): 2. ETHNIKOS ORGANISMOS DIMOSIAS YGEIAS (EODY), PIC 896563726, established in 3-5 AGRAFON ST., ATHENS 15123, Greece, 3. AGES - OSTERREICHISCHE AGENTUR FUR GESUNDHEIT UND ERNAHRUNGSSICHERHEIT GMBH (AGES), PIC 998254743, established in SPARGELFELDSTRASSE 191, WIEN 1220, Austria, 4. SCIENSANO (Sciensano), PIC 906160809, established in JULIETTE WYTSMANSTRAAT 14, ELSENE 1050, Belgium, 5. HRVATSKI ZAVOD ZA JAVNO ZDRAVSTVO (CIPH), PIC 998128255, established in ROCKEFELLEROVA 7, ZAGREB 10000, Croatia, 6. Ministry of Health of the Republic of Cyprus (MPHS-CY), PIC 994267946, established in 1 Prodromou Street & 17 Chilonos Street 1 & 17, Nicosia 1448, Cyprus, 7. STATNI ZDRAVOTNI USTAV (SZU), PIC 999478689, established in Srobarova 48, PRAHA 10 10042, Czechia, 8. TERVISEAMET (HB), PIC 933659727, established in PALDISKI MNT 81, TALLINN 10617, Estonia, 1 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 9. TERVEYDEN JA HYVINVOINNIN LAITOS (THL), PIC 996697893, established in MANNERHEIMINTIE 166, HELSINKI 00271, Finland, 10. MINISTERE DE LA SANTE ET DE LA PREVENTION (DGS-FR), PIC 998887377, established in AVENUE DUQUESNE 14, PARIS CEDEX 75350, France, 11. ROBERT KOCH-INSTITUT (RKI), PIC 999515549, established in Nordufer 20, Berlin 13353, Germany, 12. NEMZETI NEPEGESZSEGUGYI ES GYOGYSZERESZETI KOZPONT (NNGYK), PIC 998706957, established in ALBERT FLORIAN UT 2-6, BUDAPEST 1097, Hungary, 13. HEALTH SERVICE EXECUTIVE HSE (HSE), PIC 993521919, established in LIMETREE AVENUE 2ND FLO OAK HOUSE, NAAS, Ireland, 14. ISTITUTO SUPERIORE DI SANITA (ISS), PIC 999978821, established in Viale Regina Elena 299, ROMA 00161, Italy, 15. SLIMIBU PROFILAKSES UN KONTROLES CENTRS (CDPC), PIC 952714019, established in Duntes 22, Riga LV1005, Latvia, 16. NACIONALINIS VISUOMENES SVEIKATOS CENTRAS PRIE SVEIKATOS APSAUGOS MINISTERIJOS (NVSC-LT), PIC 918030796, established in KALVARIJU 153, VILNIUS LT-08221, Lithuania, 17. LUXEMBOURG INSTITUTE OF SCIENCE AND TECHNOLOGY (LIST), PIC 934320200, established in 5 AVENUE DES HAUTS FOURNEAUX, ESCH SUR ALZETTE 4362, Luxembourg, 18. Ministry for Health - Government of Malta (IDCU), PIC 974144423, established in Palazzo Castellania, Merchants Street 15, Valletta VLT 200, Malta, 19. RIJKSINSTITUUT VOOR VOLKSGEZONDHEID EN MILIEU (RIVM), PIC 999991431, established in Antonie Van Leeuwenhoeklaan 9, BILTHOVEN 3721 MA, Netherlands, 20. FOLKEHELSEINSTITUTTET (NIPH), PIC 999478883, established in LOVISENBERGGATA 8, OSLO 0456, Norway, 21. INSTITUTO NACIONAL DE SAUDE DR. RICARDO JORGE (INSA), PIC 998308190, established in AVENIDA PADRE CRUZ, LISBOA 1649-016, Portugal, 22. INSTITUTUL NATIONAL DE SANATATE PUBLICA (INSP), PIC 985926237, established in STR DR LEONTE 1-3 SECTOR 5, BUCURESTI 050463, Romania, 23. NACIONALNI INSTITUT ZA JAVNO ZDRAVJE (NIJZ), PIC 948891346, established in TRUBARJEVA CESTA 2, LJUBLJANA 1000, Slovenia, 24. INSTITUTO DE SALUD CARLOS III (ISCIII), PIC 999507886, established in MONFORTE DE LEMOS 5, MADRID 28029, Spain, 25. FOLKHALSOMYNDIGHETEN (PHAS), PIC 949789954, established in NOBELS VAG 18, SOLNA 171 82, Sweden, 2 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 26. STATE INSTITUTION PUBLIC HEALTH CENTER OF THE MINISTRY OF HEALTH OF UKRAINE (UPHC), PIC 906650465, established in 41 YAROSLAVSKA STR, KYIV 04071, Ukraine, Unless otherwise specified, references to ‘beneficiary’ or ‘beneficiaries’ include the coordinator and affiliated entities (if any). If only one beneficiary signs the grant agreement (‘mono-beneficiary grant’), all provisions referring to the ‘coordinator’ or the ‘beneficiaries’ will be considered — mutatis mutandis — as referring to the beneficiary. The parties referred to above have agreed to enter into the Agreement. By signing the Agreement and the accession forms, the beneficiaries accept the grant and agree to implement the action under their own responsibility and in accordance with the Agreement, with all the obligations and terms and conditions it sets out. The Agreement is composed of: Preamble Terms and Conditions (including Data Sheet) Annex 1 Description of the action1 Annex 2 Estimated budget for the action Annex 2a Additional information on unit costs and contributions (if applicable) Annex 3 Accession forms (if applicable)2 Annex 3a Declaration on joint and several liability of affiliated entities (if applicable)3 Annex 4 Model for the financial statements Annex 5 Specific rules (if applicable) 1 Template published on Portal Reference Documents. 2 Template published on Portal Reference Documents. 3 Template published on Portal Reference Documents. 3 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 TERMS AND CONDITIONS TABLE OF CONTENTS GRANT AGREEMENT.................................................................................................................................................... 1 PREAMBLE........................................................................................................................................................................1 TERMS AND CONDITIONS...........................................................................................................................................4 DATASHEET...................................................................................................................................................................... 9 CHAPTER 1 GENERAL..............................................................................................................................................17 ARTICLE 1 — SUBJECT OF THE AGREEMENT ..................................................................................... 17 ARTICLE 2 — DEFINITIONS........................................................................................................................17 CHAPTER 2 ACTION................................................................................................................................................. 18 ARTICLE 3 — ACTION................................................................................................................................. 18 ARTICLE 4 — DURATION AND STARTING DATE...................................................................................18 CHAPTER 3 GRANT...................................................................................................................................................18 ARTICLE 5 — GRANT...................................................................................................................................18 5.1 Form of grant......................................................................................................................................18 5.2 Maximum grant amount..................................................................................................................... 19 5.3 Funding rate........................................................................................................................................19 5.4 Estimated budget, budget categories and forms of funding.............................................................. 19 5.5 Budget flexibility................................................................................................................................19 ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS AND CONTRIBUTIONS......................................20 6.1 General eligibility conditions............................................................................................................. 20 6.2 Specific eligibility conditions for each budget category................................................................... 21 6.3 Ineligible costs and contributions...................................................................................................... 25 6.4 Consequences of non-compliance...................................................................................................... 26 CHAPTER 4 GRANT IMPLEMENTATION............................................................................................................ 26 SECTION 1 CONSORTIUM: BENEFICIARIES, AFFILIATED ENTITIES AND OTHER PARTICIPANTS........................................................................................................................................ 26 ARTICLE 7 — BENEFICIARIES................................................................................................................... 26 ARTICLE 8 — AFFILIATED ENTITIES....................................................................................................... 28 ARTICLE 9 — OTHER PARTICIPANTS INVOLVED IN THE ACTION................................................... 31 9.1 Associated partners.............................................................................................................................31 9.2 Third parties giving in-kind contributions to the action.................................................................... 31 9.3 Subcontractors.....................................................................................................................................31 4 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 9.4 Recipients of financial support to third parties..................................................................................32 ARTICLE 10 — PARTICIPANTS WITH SPECIAL STATUS....................................................................... 32 10.1 Non-EU participants......................................................................................................................... 32 10.2 Participants which are international organisations...........................................................................32 10.3 Pillar-assessed participants............................................................................................................... 33 SECTION 2 RULES FOR CARRYING OUT THE ACTION...........................................................................35 ARTICLE 11 — PROPER IMPLEMENTATION OF THE ACTION............................................................ 35 11.1 Obligation to properly implement the action................................................................................... 35 11.2 Consequences of non-compliance.................................................................................................... 35 ARTICLE 12 — CONFLICT OF INTERESTS.............................................................................................. 35 12.1 Conflict of interests.......................................................................................................................... 35 12.2 Consequences of non-compliance.................................................................................................... 36 ARTICLE 13 — CONFIDENTIALITY AND SECURITY............................................................................ 36 13.1 Sensitive information........................................................................................................................36 13.2 Classified information...................................................................................................................... 37 13.3 Consequences of non-compliance.................................................................................................... 37 ARTICLE 14 — ETHICS AND VALUES...................................................................................................... 37 14.1 Ethics.................................................................................................................................................37 14.2 Values................................................................................................................................................ 37 14.3 Consequences of non-compliance.................................................................................................... 37 ARTICLE 15 — DATA PROTECTION.......................................................................................................... 38 15.1 Data processing by the granting authority....................................................................................... 38 15.2 Data processing by the beneficiaries............................................................................................... 38 15.3 Consequences of non-compliance.................................................................................................... 38 ARTICLE 16 — INTELLECTUAL PROPERTY RIGHTS (IPR) — BACKGROUND AND RESULTS — ACCESS RIGHTS AND RIGHTS OF USE................................................................................ 39 16.1 Background and access rights to background..................................................................................39 16.2 Ownership of results.........................................................................................................................39 16.3 Rights of use of the granting authority on materials, documents and information received for policy, information, communication, dissemination and publicity purposes...................................39 16.4 Specific rules on IPR, results and background................................................................................ 40 16.5 Consequences of non-compliance.................................................................................................... 40 ARTICLE 17 — COMMUNICATION, DISSEMINATION AND VISIBILITY............................................ 40 17.1 Communication — Dissemination — Promoting the action........................................................... 40 17.2 Visibility — European flag and funding statement......................................................................... 41 17.3 Quality of information — Disclaimer..............................................................................................41 5 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 17.4 Specific communication, dissemination and visibility rules............................................................42 17.5 Consequences of non-compliance.................................................................................................... 42 ARTICLE 18 — SPECIFIC RULES FOR CARRYING OUT THE ACTION............................................... 42 18.1 Specific rules for carrying out the action........................................................................................ 42 18.2 Consequences of non-compliance.................................................................................................... 42 SECTION 3 GRANT ADMINISTRATION......................................................................................................... 42 ARTICLE 19 — GENERAL INFORMATION OBLIGATIONS.................................................................... 42 19.1 Information requests......................................................................................................................... 42 19.2 Participant Register data updates..................................................................................................... 42 19.3 Information about events and circumstances which impact the action............................................42 19.4 Consequences of non-compliance.................................................................................................... 43 ARTICLE 20 — RECORD-KEEPING............................................................................................................ 43 20.1 Keeping records and supporting documents.................................................................................... 43 20.2 Consequences of non-compliance.................................................................................................... 44 ARTICLE 21 — REPORTING........................................................................................................................ 44 21.1 Continuous reporting........................................................................................................................ 44 21.2 Periodic reporting: Technical reports and financial statements....................................................... 44 21.3 Currency for financial statements and conversion into euros..........................................................45 21.4 Reporting language...........................................................................................................................46 21.5 Consequences of non-compliance.................................................................................................... 46 ARTICLE 22 — PAYMENTS AND RECOVERIES — CALCULATION OF AMOUNTS DUE................. 46 22.1 Payments and payment arrangements.............................................................................................. 46 22.2 Recoveries.........................................................................................................................................46 22.3 Amounts due.....................................................................................................................................47 22.4 Enforced recovery.............................................................................................................................52 22.5 Consequences of non-compliance.................................................................................................... 52 ARTICLE 23 — GUARANTEES....................................................................................................................53 23.1 Prefinancing guarantee..................................................................................................................... 53 23.2 Consequences of non-compliance.................................................................................................... 53 ARTICLE 24 — CERTIFICATES................................................................................................................... 53 24.1 Operational verification report (OVR).............................................................................................54 24.2 Certificate on the financial statements (CFS).................................................................................. 54 24.3 Certificate on the compliance of usual cost accounting practices (CoMUC).................................. 54 24.4 Systems and process audit (SPA).....................................................................................................54 24.5 Consequences of non-compliance.................................................................................................... 54 6 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 ARTICLE 25 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF FINDINGS..................................................................................................................................... 54 25.1 Granting authority checks, reviews and audits................................................................................ 55 25.2 European Commission checks, reviews and audits in grants of other granting authorities..............56 25.3 Access to records for assessing simplified forms of funding.......................................................... 56 25.4 OLAF, EPPO and ECA audits and investigations........................................................................... 56 25.5 Consequences of checks, reviews, audits and investigations — Extension of results of reviews, audits or investigations.................................................................................................................... 57 25.6 Consequences of non-compliance.................................................................................................... 58 ARTICLE 26 — IMPACT EVALUATIONS................................................................................................... 58 26.1 Impact evaluation............................................................................................................................. 58 26.2 Consequences of non-compliance.................................................................................................... 58 CHAPTER 5 CONSEQUENCES OF NON-COMPLIANCE.................................................................................. 59 SECTION 1 REJECTIONS AND GRANT REDUCTION.................................................................................59 ARTICLE 27 — REJECTION OF COSTS AND CONTRIBUTIONS...........................................................59 27.1 Conditions......................................................................................................................................... 59 27.2 Procedure.......................................................................................................................................... 59 27.3 Effects............................................................................................................................................... 59 ARTICLE 28 — GRANT REDUCTION........................................................................................................ 59 28.1 Conditions......................................................................................................................................... 59 28.2 Procedure.......................................................................................................................................... 60 28.3 Effects............................................................................................................................................... 60 SECTION 2 SUSPENSION AND TERMINATION............................................................................................60 ARTICLE 29 — PAYMENT DEADLINE SUSPENSION............................................................................. 60 29.1 Conditions......................................................................................................................................... 60 29.2 Procedure.......................................................................................................................................... 60 ARTICLE 30 — PAYMENT SUSPENSION...................................................................................................61 30.1 Conditions......................................................................................................................................... 61 30.2 Procedure.......................................................................................................................................... 61 ARTICLE 31 — GRANT AGREEMENT SUSPENSION..............................................................................62 31.1 Consortium-requested GA suspension............................................................................................. 62 31.2 EU-initiated GA suspension.............................................................................................................62 ARTICLE 32 — GRANT AGREEMENT OR BENEFICIARY TERMINATION......................................... 63 32.1 Consortium-requested GA termination............................................................................................ 63 32.2 Consortium-requested beneficiary termination................................................................................ 64 32.3 EU-initiated GA or beneficiary termination.................................................................................... 66 7 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 SECTION 3 OTHER CONSEQUENCES: DAMAGES AND ADMINISTRATIVE SANCTIONS............... 69 ARTICLE 33 — DAMAGES...........................................................................................................................69 33.1 Liability of the granting authority....................................................................................................69 33.2 Liability of the beneficiaries............................................................................................................ 69 ARTICLE 34 — ADMINISTRATIVE SANCTIONS AND OTHER MEASURES....................................... 69 SECTION 4 FORCE MAJEURE.......................................................................................................................... 70 ARTICLE 35 — FORCE MAJEURE.............................................................................................................. 70 CHAPTER 6 FINAL PROVISIONS...........................................................................................................................70 ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES...............................................................70 36.1 Forms and means of communication — Electronic management................................................... 70 36.2 Date of communication.................................................................................................................... 70 36.3 Addresses for communication.......................................................................................................... 71 ARTICLE 37 — INTERPRETATION OF THE AGREEMENT.....................................................................71 ARTICLE 38 — CALCULATION OF PERIODS AND DEADLINES..........................................................71 ARTICLE 39 — AMENDMENTS.................................................................................................................. 71 39.1 Conditions......................................................................................................................................... 71 39.2 Procedure.......................................................................................................................................... 72 ARTICLE 40 — ACCESSION AND ADDITION OF NEW BENEFICIARIES........................................... 72 40.1 Accession of the beneficiaries mentioned in the Preamble............................................................. 72 40.2 Addition of new beneficiaries.......................................................................................................... 72 ARTICLE 41 — TRANSFER OF THE AGREEMENT................................................................................. 73 ARTICLE 42 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE GRANTING AUTHORITY.................................................................................................................................73 ARTICLE 43 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES.............................................. 73 43.1 Applicable law..................................................................................................................................73 43.2 Dispute settlement............................................................................................................................ 73 ARTICLE 44 — ENTRY INTO FORCE.........................................................................................................74 8 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 DATA SHEET 1. General data Project summary: Project summary The focus of this joint action, EU-WISH, is to support activities to enhance, extend and consolidate wastewater surveillance for public health. EU-WISH will improve national public health wastewater surveillance capacities by strengthening knowledge exchange and sharing best practices based on scientific evidence. The activities of this joint action will target and bring together relevant structures at national level and will facilitate the integration and complementarity of wastewater surveillance with other surveillance systems with a public health perspective to strengthen preparedness and response to cross border health threats. EU-WISH will help align epidemiological and technical methods for a range of targets for wastewater surveillance. EU-WISH supports the policy priority to strengthen the capability of the European Union for prevention of, preparedness for, and rapid response to, serious cross-border threats to health particularly through supporting data gathering, information exchange and surveillance. It implements the EU4Health Programme’s general objective of protecting people in the Union from serious cross-border threats to health and strengthening the responsiveness of health systems and coordination among the Member States to cope with serious cross-border threats to health. EU-WISH contributes to the achievement of the EU4Health Programme’s general objective of protecting people in the Union from serious cross-border threats to health and strengthening the responsiveness of health systems and coordination among the Member States. EU-WISH is a strong consortium that can contribute to a vision and activities for wastewater surveillance at not only European, but also global level. Keywords: – Wastewater surveillance, infectious diseases, outbreaks, pathogens Project number: 101140460 Project name: EU Wastewater Integrated Surveillance for Public Health Project acronym: EU-WISH Call: EU4H-2023-JA-IBA Topic: EU4H-2023-JA-IBA-02 Type of action: EU4H Project Grants Granting authority: European Health and Digital Executive Agency Grant managed through EU Funding & Tenders Portal: Yes (eGrants) Project starting date: fixed date: 1 November 2023 Project end date: 31 October 2026 Project duration: 36 months Consortium agreement: Yes 2. Participants List of participants: Total Max grant N° Role Short name Legal name Ctry PIC eligible costs amount (BEN and AE) 1 COO SSI STATENS SERUM INSTITUT DK 999937402 1 923 063.92 1 538 451.13 2 BEN EODY ETHNIKOS ORGANISMOS DIMOSIAS YGEIAS EL 896563726 744 993.92 595 995.13 2.1 AE UTH PANEPISTIMIO THESSALIAS EL 986152150 170 457.42 136 365.93 2.2 AE AUTH ARISTOTELIO PANEPISTIMIO THESSALONIKIS EL 999895692 281 737.42 225 389.93 9 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Total Max grant N° Role Short name Legal name Ctry PIC eligible costs amount (BEN and AE) 2.3 AE NKUA ETHNIKO KAI KAPODISTRIAKO PANEPISTIMIO EL 999643007 201 003.25 160 802.59 ATHINON 2.4 AE UoC PANEPISTIMIO KRITIS EL 999588978 86 474.19 69 179.34 2.5 AE UOI PANEPISTIMIO IOANNINON EL 999852818 88 869.92 71 095.93 2.6 AE UPatras PANEPISTIMIO PATRON EL 999894528 85 124.92 68 099.93 3 BEN AGES AGES - OSTERREICHISCHE AGENTUR FUR AT 998254743 527 141.92 421 713.53 GESUNDHEIT UND ERNAHRUNGSSICHERHEIT GMBH 3.1 AE MUI MEDIZINISCHE UNIVERSITAT INNSBRUCK AT 999855437 71 734.94 57 387.94 3.2 AE TU WIEN TECHNISCHE UNIVERSITAET WIEN AT 999979888 48 201.36 38 561.08 4 BEN Sciensano SCIENSANO BE 906160809 815 105.67 652 084.53 5 BEN CIPH HRVATSKI ZAVOD ZA JAVNO ZDRAVSTVO HR 998128255 597 292.08 477 833.65 6 BEN MPHS-CY Ministry of Health of the Republic of Cyprus CY 994267946 62 852.48 50 281.97 6.1 AE UCY UNIVERSITY OF CYPRUS CY 999835843 209 397.93 167 518.33 6.2 AE CING KYPRIAKO IDRYMA EREVNON GIA TI MYIKI CY 999642522 137 694.56 110 155.63 DISTROFIA 6.3 AE MoA-CY MINISTRY OF AGRICULTURE, RURAL CY 999434845 18 299.56 14 639.64 DEVELOPMENT AND ENVIRONMENT OF CYPRUS 7 BEN SZU STATNI ZDRAVOTNI USTAV CZ 999478689 352 095.27 281 676.21 7.1 AE UCT VYSOKA SKOLA CHEMICKO-TECHNOLOGICKA V CZ 999867853 250 637.87 200 510.29 PRAZE 8 BEN HB TERVISEAMET EE 933659727 389 754.78 311 803.81 9 BEN THL TERVEYDEN JA HYVINVOINNIN LAITOS FI 996697893 966 075.18 772 860.13 10 BEN DGS-FR MINISTERE DE LA SANTE ET DE LA PREVENTION FR 998887377 99 034.92 79 227.93 10.1 AE SpFrance AGENCE NATIONALE DE SANTE PUBLIQUE FR 917843489 432 034.55 345 627.63 10.2 AE ANSES AGENCE NATIONALE DE LA SECURITE SANITAIRE FR 983552356 545 493.67 436 394.93 DE L ALIMENTATION DE L ENVIRONNEMENT ET DU TRAVAIL 11 BEN RKI ROBERT KOCH-INSTITUT DE 999515549 541 628.12 433 302.48 11.1 AE UBA UMWELTBUNDESAMT DE 998575910 187 162.26 149 729.80 12 BEN NNGYK NEMZETI NEPEGESZSEGUGYI ES HU 998706957 573 151.92 458 521.53 GYOGYSZERESZETI KOZPONT 13 BEN HSE HEALTH SERVICE EXECUTIVE HSE IE 993521919 176 576.41 141 261.12 13.1 AE UCD UNIVERSITY COLLEGE DUBLIN, NATIONAL IE 999974359 301 414.29 241 131.42 UNIVERSITY OF IRELAND, DUBLIN 13.2 AE UÉ IRISH WATER IE 936928918 70 956.32 56 765.05 14 BEN ISS ISTITUTO SUPERIORE DI SANITA IT 999978821 434 088.30 347 270.63 14.1 AE IT MOH MINISTERO DELLA SALUTE IT 999531942 20 114.93 16 091.93 14.2 AE FBK FONDAZIONE BRUNO KESSLER IT 999625450 83 275.96 66 620.76 14.3 AE RLDGW REGIONE LOMBARDIA IT 999654065 98 038.85 78 431.07 15 BEN CDPC SLIMIBU PROFILAKSES UN KONTROLES CENTRS LV 952714019 81 051.88 64 841.49 15.1 AE BIOR PARTIKAS DROSIBAS, DZIVNIEKU VESELIBAS UN LV 953459367 280 666.89 224 533.50 VIDES ZINATNISKAIS INSTITUTSBIOR 15.2 AE LBMC LATVIJAS BIOMEDICINAS PETIJUMU UN STUDIJU LV 998836646 252 817.46 202 253.96 CENTRS 16 BEN NVSC-LT NACIONALINIS VISUOMENES SVEIKATOS CENTRAS LT 918030796 119 652.75 95 722.19 PRIE SVEIKATOS APSAUGOS MINISTERIJOS 16.1 AE NVSPL-LT NACIONALINE VISUOMENES SVEIKATOS LT 933651094 138 271.82 110 617.45 PRIEZIUROS LABORATORIJA 10 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Total Max grant N° Role Short name Legal name Ctry PIC eligible costs amount (BEN and AE) 17 BEN LIST LUXEMBOURG INSTITUTE OF SCIENCE AND LU 934320200 570 399.52 456 319.60 TECHNOLOGY 17.1 AE LNS LABORATOIRE NATIONAL DE SANTE LU 911247586 198 009.92 158 407.93 18 BEN IDCU Ministry for Health - Government of Malta MT 974144423 666 401.86 533 121.48 19 BEN RIVM RIJKSINSTITUUT VOOR VOLKSGEZONDHEID EN NL 999991431 929 873.60 743 898.87 MILIEU 20 BEN NIPH FOLKEHELSEINSTITUTTET NO 999478883 615 844.39 492 675.50 20.1 AE NVI VETERINAERINSTITUTTET NO 999511378 119 368.56 95 494.84 21 BEN INSA INSTITUTO NACIONAL DE SAUDE DR. RICARDO PT 998308190 271 370.37 217 096.28 JORGE 21.1 AE DGS MINISTERIO DA SAUDE - REPUBLICA PORTUGUESA PT 986364095 129 627.00 103 701.59 21.2 AE AdP VALOR ADP VALOR - SERVIÇOS AMBIENTAIS, S.A. PT 984102346 131 576.35 105 261.07 22 BEN INSP INSTITUTUL NATIONAL DE SANATATE PUBLICA RO 985926237 515 880.60 412 704.47 23 BEN NIJZ NACIONALNI INSTITUT ZA JAVNO ZDRAVJE SI 948891346 498 358.92 398 687.13 23.1 AE NLZOH NACIONALNI LABORATORIJ ZA ZDRAVJE, OKOLJE SI 949131227 101 281.92 81 025.53 IN HRANO 24 BEN ISCIII INSTITUTO DE SALUD CARLOS III ES 999507886 182 821.81 146 257.43 24.1 AE AEMPS AGENCIA ESPANOLA DE MEDICAMENTOS Y ES 999563952 29 202.44 23 361.94 PRODUCTOS SANITARIOS 24.2 AE UB UNIVERSITAT DE BARCELONA ES 999986387 87 918.69 70 334.94 24.3 AE USC UNIVERSIDAD DE SANTIAGO DE COMPOSTELA ES 999829635 77 818.96 62 255.16 24.4 AE USAL UNIVERSIDAD DE SALAMANCA ES 999846610 27 141.02 21 712.81 25 BEN PHAS FOLKHALSOMYNDIGHETEN SE 949789954 519 651.92 415 721.53 25.1 AE SLU SVERIGES LANTBRUKSUNIVERSITET SE 999887350 36 140.32 28 912.25 26 BEN UPHC STATE INSTITUTION PUBLIC HEALTH CENTER OF UA 906650465 567 669.05 454 135.23 THE MINISTRY OF HEALTH OF UKRAINE 27 AP ANA ANA - AEROPORTOS DE PORTUGAL, SA PT 999943222 0.00 0.00 28 AP APA AGENCIA PORTUGUESA DO AMBIENTE IP PT 917950286 0.00 0.00 29 AP CCAES MINISTERIO DE SANIDAD ES 905231452 0.00 0.00 Total 18 739 797.08 14 991 837.10 Coordinator: – STATENS SERUM INSTITUT (SSI) 3. Grant Maximum grant amount, total estimated eligible costs and contributions and funding rate: Total eligible costs Funding rate Maximum grant amount Maximum grant amount (BEN and AE) (%) (Annex 2) (award decision) 18 739 797.08 80 14 991 837.10 14 991 837.10 Grant form: Budget-based Grant mode: Action grant Budget categories/activity types: - A. Personnel costs 11 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 - A.1 Employees, A.2 Natural persons under direct contract, A.3 Seconded persons - A.4 SME owners and natural person beneficiaries - B. Subcontracting costs - C. Purchase costs - C.1 Travel and subsistence - C.2 Equipment - C.3 Other goods, works and services - D. Other cost categories - D.1 Financial support to third parties - E. Indirect costs Cost eligibility options: - Standard supplementary payments - Limitation for subcontracting - Travel and subsistence: - Travel: Unit or Actual costs - Accommodation: Unit or Actual costs - Subsistence: Unit or Actual costs - Equipment: depreciation only - Costs for providing financial support to third parties (actual cost; max amount for each recipient: EUR 0.00) - Indirect cost flat-rate: 7% of the eligible direct costs (categories A-D, except volunteers costs and exempted specific cost categories, if any) - VAT: Yes - Other ineligible costs Budget flexibility: Yes (no flexibility cap) 4. Reporting, payments and recoveries 4.1 Continuous reporting (art 21) Deliverables: see Funding & Tenders Portal Continuous Reporting tool 4.2 Periodic reporting and payments 12 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Reporting and payment schedule (art 21, 22): Reporting Payments Deadline Reporting periods Type Deadline Type (time to pay) RP No Month from Month to 30 days from entry into force/10 days before starting date/ Initial prefinancing financial guarantee (if required) – whichever is the latest 1 1 18 Periodic report 60 days after end Interim payment 90 days from of reporting period receiving periodic report 2 19 36 Periodic report 60 days after end Final payment 90 days from of reporting period receiving periodic report Prefinancing payments and guarantees: Prefinancing payment Prefinancing guarantee Guarantee Type Amount Division per participant amount Prefinancing 1 (initial) 7 495 918.55 n/a 1 - SSI n/a 2 - EODY n/a 2.1 - UTH n/a 2.2 - AUTH n/a 2.3 - NKUA n/a 2.4 - UoC n/a 2.5 - UOI n/a 2.6 - UPatras n/a 3 - AGES n/a 3.1 - MUI n/a 3.2 - TU WIEN n/a 4 - Sciensano n/a 5 - CIPH n/a 6 - MPHS-CY n/a 6.1 - UCY n/a 6.2 - CING n/a 6.3 - MoA-CY n/a 7 - SZU n/a 7.1 - UCT n/a 8 - HB n/a 9 - THL n/a 10 - DGS-FR n/a 10.1 - SpFrance n/a 10.2 - ANSES n/a 11 - RKI n/a 11.1 - UBA n/a 13 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Prefinancing payment Prefinancing guarantee Guarantee Type Amount Division per participant amount 12 - NNGYK n/a 13 - HSE n/a 13.1 - UCD n/a 13.2 - UÉ n/a 14 - ISS n/a 14.1 - IT MOH n/a 14.2 - FBK n/a 14.3 - RLDGW n/a 15 - CDPC n/a 15.1 - BIOR n/a 15.2 - LBMC n/a 16 - NVSC-LT n/a 16.1 - NVSPL-LT n/a 17 - LIST n/a 17.1 - LNS n/a 18 - IDCU n/a 19 - RIVM n/a 20 - NIPH n/a 20.1 - NVI n/a 21 - INSA n/a 21.1 - DGS n/a 21.2 - AdP VALOR n/a 22 - INSP n/a 23 - NIJZ n/a 23.1 - NLZOH n/a 24 - ISCIII n/a 24.1 - AEMPS n/a 24.2 - UB n/a 24.3 - USC n/a 24.4 - USAL n/a 25 - PHAS n/a 25.1 - SLU n/a 26 - UPHC n/a Reporting and payment modalities (art 21, 22): Mutual Insurance Mechanism (MIM): No Restrictions on distribution of initial prefinancing: The prefinancing may be distributed only if the minimum number of beneficiaries set out in the call condititions (if any) have acceded to the Agreement and only to beneficiaries that have acceded. Interim payment ceiling (if any): 90% of the maximum grant amount No-profit rule: Yes 14 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Late payment interest: ECB + 3.5% Bank account for payments: DK2530003100010704 Conversion into euros: Double conversion Reporting language: Language of the Agreement 4.3 Certificates (art 24): Certificates on the financial statements (CFS): Conditions: Schedule: interim/final payment, if threshold is reached Standard threshold (beneficiary-level): - financial statement: requested EU contribution to costs ≥ EUR 325 000.00 4.4 Recoveries (art 22) First-line liability for recoveries: Beneficiary termination: Beneficiary concerned Final payment: Coordinator After final payment: Beneficiary concerned Joint and several liability for enforced recoveries (in case of non-payment): Limited joint and several liability of other beneficiaries — up to the maximum grant amount of the beneficiary Joint and several liability of affiliated entities — n/a 5. Consequences of non-compliance, applicable law & dispute settlement forum Applicable law (art 43): Standard applicable law regime: EU law + law of Belgium Dispute settlement forum (art 43): Standard dispute settlement forum: EU beneficiaries: EU General Court + EU Court of Justice (on appeal) Non-EU beneficiaries: Courts of Brussels, Belgium (unless an international agreement provides for the enforceability of EU court judgements) 6. Other Specific rules (Annex 5): Yes Standard time-limits after project end: Confidentiality (for X years after final payment): 5 15 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Record-keeping (for X years after final payment): 5 (or 3 for grants of not more than EUR 60 000) Reviews (up to X years after final payment): 5 (or 3 for grants of not more than EUR 60 000) Audits (up to X years after final payment): 5 (or 3 for grants of not more than EUR 60 000) Extension of findings from other grants to this grant (no later than X years after final payment): 5 (or 3 for grants of not more than EUR 60 000) Impact evaluation (up to X years after final payment): 5 (or 3 for grants of not more than EUR 60 000) 16 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 CHAPTER 1 GENERAL ARTICLE 1 — SUBJECT OF THE AGREEMENT This Agreement sets out the rights and obligations and terms and conditions applicable to the grant awarded for the implementation of the action set out in Chapter 2. ARTICLE 2 — DEFINITIONS For the purpose of this Agreement, the following definitions apply: Actions — The project which is being funded in the context of this Agreement. Grant — The grant awarded in the context of this Agreement. EU grants — Grants awarded by EU institutions, bodies, offices or agencies (including EU executive agencies, EU regulatory agencies, EDA, joint undertakings, etc.). Participants — Entities participating in the action as beneficiaries, affiliated entities, associated partners, third parties giving in-kind contributions, subcontractors or recipients of financial support to third parties. Beneficiaries (BEN) — The signatories of this Agreement (either directly or through an accession form). Affiliated entities (AE) — Entities affiliated to a beneficiary within the meaning of Article 187 of EU Financial Regulation 2018/10464 which participate in the action with similar rights and obligations as the beneficiaries (obligation to implement action tasks and right to charge costs and claim contributions). Associated partners (AP) — Entities which participate in the action, but without the right to charge costs or claim contributions. Purchases — Contracts for goods, works or services needed to carry out the action (e.g. equipment, consumables and supplies) but which are not part of the action tasks (see Annex 1). Subcontracting — Contracts for goods, works or services that are part of the action tasks (see Annex 1). In-kind contributions — In-kind contributions within the meaning of Article 2(36) of EU Financial 4 For the definition, see Article 187 Regulation (EU, Euratom) 2018/1046 of the European Parliament and of the Council of 18 July 2018 on the financial rules applicable to the general budget of the Union, amending Regulations (EU) No 1296/2013, (EU) No 1301/2013, (EU) No 1303/2013, (EU) No 1304/2013, (EU) No 1309/2013, (EU) No 1316/2013, (EU) No 223/2014, (EU) No 283/2014, and Decision No 541/2014/EU and repealing Regulation (EU, Euratom) No 966/2012 (‘EU Financial Regulation’) (OJ L 193, 30.7.2018, p. 1): “affiliated entities [are]: (a) entities that form a sole beneficiary [(i.e. where an entity is formed of several entities that satisfy the criteria for being awarded a grant, including where the entity is specifically established for the purpose of implementing an action to be financed by a grant)]; (b) entities that satisfy the eligibility criteria and that do not fall within one of the situations referred to in Article 136(1) and 141(1) and that have a link with the beneficiary, in particular a legal or capital link, which is neither limited to the action nor established for the sole purpose of its implementation”. 17 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Regulation 2018/1046, i.e. non-financial resources made available free of charge by third parties. Fraud — Fraud within the meaning of Article 3 of EU Directive 2017/13715 and Article 1 of the Convention on the protection of the European Communities’ financial interests, drawn up by the Council Act of 26 July 19956, as well as any other wrongful or criminal deception intended to result in financial or personal gain. Irregularities — Any type of breach (regulatory or contractual) which could impact the EU financial interests, including irregularities within the meaning of Article 1(2) of EU Regulation 2988/957. Grave professional misconduct — Any type of unacceptable or improper behaviour in exercising one’s profession, especially by employees, including grave professional misconduct within the meaning of Article 136(1)(c) of EU Financial Regulation 2018/1046. Applicable EU, international and national law — Any legal acts or other (binding or non-binding) rules and guidance in the area concerned. Portal — EU Funding & Tenders Portal; electronic portal and exchange system managed by the European Commission and used by itself and other EU institutions, bodies, offices or agencies for the management of their funding programmes (grants, procurements, prizes, etc.). CHAPTER 2 ACTION ARTICLE 3 — ACTION The grant is awarded for the action 101140460 — EU-WISH (‘action’), as described in Annex 1. ARTICLE 4 — DURATION AND STARTING DATE The duration and the starting date of the action are set out in the Data Sheet (see Point 1). CHAPTER 3 GRANT ARTICLE 5 — GRANT 5.1 Form of grant The grant is an action grant8 which takes the form of a budget-based mixed actual cost grant (i.e. a 5 Directive (EU) 2017/1371 of the European Parliament and of the Council of 5 July 2017 on the fight against fraud to the Union’s financial interests by means of criminal law (OJ L 198, 28.7.2017, p. 29). 6 OJ C 316, 27.11.1995, p. 48. 7 Council Regulation (EC, Euratom) No 2988/95 of 18 December 1995 on the protection of the European Communities financial interests (OJ L 312, 23.12.1995, p. 1). 8 For the definition, see Article 180(2)(a) EU Financial Regulation 2018/1046: ‘action grant’ means an EU grant to finance “an action intended to help achieve a Union policy objective”. 18 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 grant based on actual costs incurred, but which may also include other forms of funding, such as unit costs or contributions, flat-rate costs or contributions, lump sum costs or contributions or financing not linked to costs). 5.2 Maximum grant amount The maximum grant amount is set out in the Data Sheet (see Point 3) and in the estimated budget (Annex 2). 5.3 Funding rate The funding rate for costs is 80% of the action’s eligible costs. Contributions are not subject to any funding rate. 5.4 Estimated budget, budget categories and forms of funding The estimated budget for the action is set out in Annex 2. It contains the estimated eligible costs and contributions for the action, broken down by participant and budget category. Annex 2 also shows the types of costs and contributions (forms of funding)9 to be used for each budget category. If unit costs or contributions are used, the details on the calculation will be explained in Annex 2a. 5.5 Budget flexibility The budget breakdown may be adjusted — without an amendment (see Article 39) — by transfers (between participants and budget categories), as long as this does not imply any substantive or important change to the description of the action in Annex 1. However: - changes to the budget category for volunteers (if used) always require an amendment - changes to budget categories with lump sums costs or contributions (if used; including financing not linked to costs) always require an amendment - changes to budget categories with higher funding rates or budget ceilings (if used) always require an amendment - addition of amounts for subcontracts not provided for in Annex 1 either require an amendment or simplified approval in accordance with Article 6.2 - other changes require an amendment or simplified approval, if specifically provided for in Article 6.2 - flexibility caps: not applicable. 9 See Article 125 EU Financial Regulation 2018/1046. 19 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS AND CONTRIBUTIONS In order to be eligible, costs and contributions must meet the eligibility conditions set out in this Article. 6.1 General eligibility conditions The general eligibility conditions are the following: (a) for actual costs: (i) they must be actually incurred by the beneficiary (ii) they must be incurred in the period set out in Article 4 (with the exception of costs relating to the submission of the final periodic report, which may be incurred afterwards; see Article 21) (iii) they must be declared under one of the budget categories set out in Article 6.2 and Annex 2 (iv) they must be incurred in connection with the action as described in Annex 1 and necessary for its implementation (v) they must be identifiable and verifiable, in particular recorded in the beneficiary’s accounts in accordance with the accounting standards applicable in the country where the beneficiary is established and with the beneficiary’s usual cost accounting practices (vi) they must comply with the applicable national law on taxes, labour and social security and (vii) they must be reasonable, justified and must comply with the principle of sound financial management, in particular regarding economy and efficiency (b) for unit costs or contributions (if any): (i) they must be declared under one of the budget categories set out in Article 6.2 and Annex 2 (ii) the units must: - be actually used or produced by the beneficiary in the period set out in Article 4 (with the exception of units relating to the submission of the final periodic report, which may be used or produced afterwards; see Article 21) - be necessary for the implementation of the action and (iii) the number of units must be identifiable and verifiable, in particular supported by records and documentation (see Article 20) (c) for flat-rate costs or contributions (if any): (i) they must be declared under one of the budget categories set out in Article 6.2 and Annex 2 20 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 (ii) the costs or contributions to which the flat-rate is applied must: - be eligible - relate to the period set out in Article 4 (with the exception of costs or contributions relating to the submission of the final periodic report, which may be incurred afterwards; see Article 21) (d) for lump sum costs or contributions (if any): (i) they must be declared under one of the budget categories set out in Article 6.2 and Annex 2 (ii) the work must be properly implemented by the beneficiary in accordance with Annex 1 (iii) the deliverables/outputs must be achieved in the period set out in Article 4 (with the exception of deliverables/outputs relating to the submission of the final periodic report, which may be achieved afterwards; see Article 21) (e) for unit, flat-rate or lump sum costs or contributions according to usual cost accounting practices (if any): (i) they must fulfil the general eligibility conditions for the type of cost concerned (ii) the cost accounting practices must be applied in a consistent manner, based on objective criteria, regardless of the source of funding (f) for financing not linked to costs (if any): the results must be achieved or the conditions must be fulfilled as described in Annex 1. In addition, for direct cost categories (e.g. personnel, travel & subsistence, subcontracting and other direct costs) only costs that are directly linked to the action implementation and can therefore be attributed to it directly are eligible. They must not include any indirect costs (i.e. costs that are only indirectly linked to the action, e.g. via cost drivers). 6.2 Specific eligibility conditions for each budget category For each budget category, the specific eligibility conditions are as follows: Direct costs A. Personnel costs A.1 Costs for employees (or equivalent) are eligible as personnel costs if they fulfil the general eligibility conditions and are related to personnel working for the beneficiary under an employment contract (or equivalent appointing act) and assigned to the action. They must be limited to salaries, social security contributions, taxes and other costs linked to the remuneration, if they arise from national law or the employment contract (or equivalent appointing act) and be calculated on the basis of the costs actually incurred, in accordance with the following method: 21 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 {daily rate for the person multiplied by number of day-equivalents worked on the action (rounded up or down to the nearest half-day)}. The daily rate must be calculated as: {annual personnel costs for the person divided by 215}. The number of day-equivalents declared for a person must be identifiable and verifiable (see Article 20). The total number of day-equivalents declared in EU grants, for a person for a year, cannot be higher than 215. The personnel costs may also include supplementary payments for personnel assigned to the action (including payments on the basis of supplementary contracts regardless of their nature), if: - it is part of the beneficiary’s usual remuneration practices and is paid in a consistent manner whenever the same kind of work or expertise is required - the criteria used to calculate the supplementary payments are objective and generally applied by the beneficiary, regardless of the source of funding used. A.2 and A.3 Costs for natural persons working under a direct contract other than an employment contract and costs for seconded persons by a third party against payment are also eligible as personnel costs, if they are assigned to the action, fulfil the general eligibility conditions and: (a) work under conditions similar to those of an employee (in particular regarding the way the work is organised, the tasks that are performed and the premises where they are performed) and (b) the result of the work belongs to the beneficiary (unless agreed otherwise). They must be calculated on the basis of a rate which corresponds to the costs actually incurred for the direct contract or secondment and must not be significantly different from those for personnel performing similar tasks under an employment contract with the beneficiary. A.4 The work of SME owners for the action (i.e. owners of beneficiaries that are small and medium- sized enterprises10 not receiving a salary) or natural person beneficiaries (i.e. beneficiaries that are natural persons not receiving a salary) may be declared as personnel costs, if they fulfil the general 10 For the definition, see Commission Recommendation 2003/361/EC: micro, small or medium-sized enterprise (SME) are enterprises - engaged in an economic activity, irrespective of their legal form (including, in particular, self- employed persons and family businesses engaged in craft or other activities, and partnerships or associations regularly engaged in an economic activity) and - employing fewer than 250 persons (expressed in ‘annual working units’ as defined in Article 5 of the Recommendation) and which have an annual turnover not exceeding EUR 50 million, and/or an annual balance sheet total not exceeding EUR 43 million. 22 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 eligibility conditions and are calculated as unit costs in accordance with the method set out in Annex 2a. B. Subcontracting costs Subcontracting costs for the action (including related duties, taxes and charges, such as non- deductible or non-refundable value added tax (VAT)) are eligible, if they are calculated on the basis of the costs actually incurred, fulfil the general eligibility conditions and are awarded using the beneficiary’s usual purchasing practices — provided these ensure subcontracts with best value for money (or if appropriate the lowest price) and that there is no conflict of interests (see Article 12). Beneficiaries that are ‘contracting authorities/entities’ within the meaning of the EU Directives on public procurement must also comply with the applicable national law on public procurement. Subcontracting may cover only a limited part of the action. The tasks to be subcontracted and the estimated cost for each subcontract must be set out in Annex 1 and the total estimated costs of subcontracting per beneficiary must be set out in Annex 2 (or may be approved ex post in the periodic report, if the use of subcontracting does not entail changes to the Agreement which would call into question the decision awarding the grant or breach the principle of equal treatment of applicants; ‘simplified approval procedure’). C. Purchase costs Purchase costs for the action (including related duties, taxes and charges, such as non-deductible or non-refundable value added tax (VAT)) are eligible if they fulfil the general eligibility conditions and are bought using the beneficiary’s usual purchasing practices — provided these ensure purchases with best value for money (or if appropriate the lowest price) and that there is no conflict of interests (see Article 12). Beneficiaries that are ‘contracting authorities/entities’ within the meaning of the EU Directives on public procurement must also comply with the applicable national law on public procurement. C.1 Travel and subsistence Purchases for travel, accommodation and subsistence must be calculated as follows: - travel: as unit costs in accordance with the method set out in Annex 2a if covered by Decision C(2021)3511 or otherwise as costs actually incurred and in line with the beneficiary’s usual practices on travel - accommodation: as unit costs in accordance with the method set out in Annex 2a if covered by Decision C(2021)3512 or otherwise as costs actually incurred and in line with the beneficiary’s usual practices on travel - subsistence: as unit costs in accordance with the method set out in Annex 2a if covered by 11 Commission Decision of 12 January 2021 authorising the use of unit costs for travel, accommodation and subsistence costs under an action or work programme under the 2021-2027 multi-annual financial framework (C(2021)35). 12 Commission Decision of 12 January 2021 authorising the use of unit costs for travel, accommodation and subsistence costs under an action or work programme under the 2021-2027 multi-annual financial framework (C(2021)35). 23 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Decision C(2021)3513 or otherwise as costs actually incurred and in line with the beneficiary’s usual practices on travel. C.2 Equipment Purchases of equipment, infrastructure or other assets used for the action must be declared as depreciation costs, calculated on the basis of the costs actually incurred and written off in accordance with international accounting standards and the beneficiary’s usual accounting practices. Only the portion of the costs that corresponds to the rate of actual use for the action during the action duration can be taken into account. Costs for renting or leasing equipment, infrastructure or other assets are also eligible, if they do not exceed the depreciation costs of similar equipment, infrastructure or assets and do not include any financing fees. C.3 Other goods, works and services Purchases of other goods, works and services must be calculated on the basis of the costs actually incurred. Such goods, works and services include, for instance, consumables and supplies, promotion, dissemination, protection of results, translations, publications, certificates and financial guarantees, if required under the Agreement. D. Other cost categories D.1 Financial support to third parties Costs for providing financial support to third parties (in the form of grants, prizes or similar forms of support; if any) are eligible, if and as declared eligible in the call conditions, if they fulfil the general eligibility conditions, are calculated on the basis of the costs actually incurred and the support is implemented in accordance with the conditions set out in Annex 1. These conditions must ensure objective and transparent selection procedures and include at least the following: (a) for grants (or similar): (i) the maximum amount of financial support for each third party (‘recipient’); this amount may not exceed the amount set out in the Data Sheet (see Point 3) or otherwise agreed with the granting authority (ii) the criteria for calculating the exact amount of the financial support (iii) the different types of activity that qualify for financial support, on the basis of a closed list (iv) the persons or categories of persons that will be supported and (v) the criteria and procedures for giving financial support 13 Commission Decision of 12 January 2021 authorising the use of unit costs for travel, accommodation and subsistence costs under an action or work programme under the 2021-2027 multi-annual financial framework (C(2021)35). 24 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 (b) for prizes (or similar): (i) the eligibility and award criteria (ii) the amount of the prize and (iii) the payment arrangements. Indirect costs E. Indirect costs Indirect costs will be reimbursed at the flat-rate of 7% of the eligible direct costs (categories A-D, except volunteers costs and exempted specific cost categories, if any). Contributions Not applicable 6.3 Ineligible costs and contributions The following costs or contributions are ineligible: (a) costs or contributions that do not comply with the conditions set out above (Article 6.1 and 6.2), in particular: (i) costs related to return on capital and dividends paid by a beneficiary (ii) debt and debt service charges (iii) provisions for future losses or debts (iv) interest owed (v) currency exchange losses (vi) bank costs charged by the beneficiary’s bank for transfers from the granting authority (vii) excessive or reckless expenditure (viii) deductible or refundable VAT (including VAT paid by public bodies acting as public authority) (ix) costs incurred or contributions for activities implemented during grant agreement suspension (see Article 31) (x) in-kind contributions by third parties (b) costs or contributions declared under other EU grants (or grants awarded by an EU Member State, non-EU country or other body implementing the EU budget), except for the following cases: (i) Synergy actions: not applicable 25 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 (ii) if the action grant is combined with an operating grant14 running during the same period and the beneficiary can demonstrate that the operating grant does not cover any (direct or indirect) costs of the action grant (c) costs or contributions for staff of a national (or regional/local) administration, for activities that are part of the administration’s normal activities (i.e. not undertaken only because of the grant) (d) costs or contributions (especially travel and subsistence) for staff or representatives of EU institutions, bodies or agencies (e) other : (i) country restrictions for eligible costs: not applicable (ii) costs or contributions declared specifically ineligible in the call conditions. 6.4 Consequences of non-compliance If a beneficiary declares costs or contributions that are ineligible, they will be rejected (see Article 27). This may also lead to other measures described in Chapter 5. CHAPTER 4 GRANT IMPLEMENTATION SECTION 1 CONSORTIUM: BENEFICIARIES, AFFILIATED ENTITIES AND OTHER PARTICIPANTS ARTICLE 7 — BENEFICIARIES The beneficiaries, as signatories of the Agreement, are fully responsible towards the granting authority for implementing it and for complying with all its obligations. They must implement the Agreement to their best abilities, in good faith and in accordance with all the obligations and terms and conditions it sets out. They must have the appropriate resources to implement the action and implement the action under their own responsibility and in accordance with Article 11. If they rely on affiliated entities or other participants (see Articles 8 and 9), they retain sole responsibility towards the granting authority and the other beneficiaries. They are jointly responsible for the technical implementation of the action. If one of the beneficiaries fails to implement their part of the action, the other beneficiaries must ensure that this part is implemented by someone else (without being entitled to an increase of the maximum grant amount and subject to an amendment; see Article 39). The financial responsibility of each beneficiary in case of recoveries is governed by Article 22. 14 For the definition, see Article 180(2)(b) of EU Financial Regulation 2018/1046: ‘operating grant’ means an EU grant to finance “the functioning of a body which has an objective forming part of and supporting an EU policy”. 26 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 The beneficiaries (and their action) must remain eligible under the EU programme funding the grant for the entire duration of the action. Costs and contributions will be eligible only as long as the beneficiary and the action are eligible. The internal roles and responsibilities of the beneficiaries are divided as follows: (a) Each beneficiary must: (i) keep information stored in the Portal Participant Register up to date (see Article 19) (ii) inform the granting authority (and the other beneficiaries) immediately of any events or circumstances likely to affect significantly or delay the implementation of the action (see Article 19) (iii) submit to the coordinator in good time: - the prefinancing guarantees (if required; see Article 23) - the financial statements and certificates on the financial statements (CFS) (if required; see Articles 21 and 24.2 and Data Sheet, Point 4.3) - the contribution to the deliverables and technical reports (see Article 21) - any other documents or information required by the granting authority under the Agreement (iv) submit via the Portal data and information related to the participation of their affiliated entities. (b) The coordinator must: (i) monitor that the action is implemented properly (see Article 11) (ii) act as the intermediary for all communications between the consortium and the granting authority, unless the Agreement or granting authority specifies otherwise, and in particular: - submit the prefinancing guarantees to the granting authority (if any) - request and review any documents or information required and verify their quality and completeness before passing them on to the granting authority - submit the deliverables and reports to the granting authority - inform the granting authority about the payments made to the other beneficiaries (report on the distribution of payments; if required, see Articles 22 and 32) (iii) distribute the payments received from the granting authority to the other beneficiaries without unjustified delay (see Article 22). The coordinator may not delegate or subcontract the above-mentioned tasks to any other beneficiary or third party (including affiliated entities). 27 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 However, coordinators which are public bodies may delegate the tasks set out in Point (b)(ii) last indent and (iii) above to entities with ‘authorisation to administer’ which they have created or which are controlled by or affiliated to them. In this case, the coordinator retains sole responsibility for the payments and for compliance with the obligations under the Agreement. Moreover, coordinators which are ‘sole beneficiaries’15 (or similar, such as European research infrastructure consortia (ERICs)) may delegate the tasks set out in Point (b)(i) to (iii) above to one of their members. The coordinator retains sole responsibility for compliance with the obligations under the Agreement. The beneficiaries must have internal arrangements regarding their operation and co-ordination, to ensure that the action is implemented properly. If required by the granting authority (see Data Sheet, Point 1), these arrangements must be set out in a written consortium agreement between the beneficiaries, covering for instance: - the internal organisation of the consortium - the management of access to the Portal - different distribution keys for the payments and financial responsibilities in case of recoveries (if any) - additional rules on rights and obligations related to background and results (see Article 16) - settlement of internal disputes - liability, indemnification and confidentiality arrangements between the beneficiaries. The internal arrangements must not contain any provision contrary to this Agreement. ARTICLE 8 — AFFILIATED ENTITIES The following entities which are linked to a beneficiary will participate in the action as ‘affiliated entities’: - PANEPISTIMIO THESSALIAS (UTH), PIC 986152150, linked to ETHNIKOS ORGANISMOS DIMOSIAS YGEIAS (EODY) - ARISTOTELIO PANEPISTIMIO THESSALONIKIS (AUTH), PIC 999895692, linked to ETHNIKOS ORGANISMOS DIMOSIAS YGEIAS (EODY) - ETHNIKO KAI KAPODISTRIAKO PANEPISTIMIO ATHINON (NKUA), PIC 999643007, linked to ETHNIKOS ORGANISMOS DIMOSIAS YGEIAS (EODY) - PANEPISTIMIO KRITIS (UoC), PIC 999588978, linked to ETHNIKOS ORGANISMOS DIMOSIAS YGEIAS (EODY) 15 For the definition, see Article 187(2) EU Financial Regulation 2018/1046: “Where several entities satisfy the criteria for being awarded a grant and together form one entity, that entity may be treated as the sole beneficiary, including where it is specifically established for the purpose of implementing the action financed by the grant.” 28 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 - PANEPISTIMIO IOANNINON (UOI), PIC 999852818, linked to ETHNIKOS ORGANISMOS DIMOSIAS YGEIAS (EODY) - PANEPISTIMIO PATRON (UPatras), PIC 999894528, linked to ETHNIKOS ORGANISMOS DIMOSIAS YGEIAS (EODY) - MEDIZINISCHE UNIVERSITAT INNSBRUCK (MUI), PIC 999855437, linked to AGES - OSTERREICHISCHE AGENTUR FUR GESUNDHEIT UND ERNAHRUNGSSICHERHEIT GMBH (AGES) - TECHNISCHE UNIVERSITAET WIEN (TU WIEN), PIC 999979888, linked to AGES - OSTERREICHISCHE AGENTUR FUR GESUNDHEIT UND ERNAHRUNGSSICHERHEIT GMBH (AGES) - UNIVERSITY OF CYPRUS (UCY), PIC 999835843, linked to Ministry of Health of the Republic of Cyprus (MPHS-CY) - KYPRIAKO IDRYMA EREVNON GIA TI MYIKI DISTROFIA (CING), PIC 999642522, linked to Ministry of Health of the Republic of Cyprus (MPHS-CY) - MINISTRY OF AGRICULTURE, RURAL DEVELOPMENT AND ENVIRONMENT OF CYPRUS (MoA-CY), PIC 999434845, linked to Ministry of Health of the Republic of Cyprus (MPHS-CY) - VYSOKA SKOLA CHEMICKO-TECHNOLOGICKA V PRAZE (UCT), PIC 999867853, linked to STATNI ZDRAVOTNI USTAV (SZU) - AGENCE NATIONALE DE SANTE PUBLIQUE (SpFrance), PIC 917843489, linked to MINISTERE DE LA SANTE ET DE LA PREVENTION (DGS-FR) - AGENCE NATIONALE DE LA SECURITE SANITAIRE DE L ALIMENTATION DE L ENVIRONNEMENT ET DU TRAVAIL (ANSES), PIC 983552356, linked to MINISTERE DE LA SANTE ET DE LA PREVENTION (DGS-FR) - UMWELTBUNDESAMT (UBA), PIC 998575910, linked to ROBERT KOCH-INSTITUT (RKI) - UNIVERSITY COLLEGE DUBLIN, NATIONAL UNIVERSITY OF IRELAND, DUBLIN (UCD), PIC 999974359, linked to HEALTH SERVICE EXECUTIVE HSE (HSE) - IRISH WATER (UÉ), PIC 936928918, linked to HEALTH SERVICE EXECUTIVE HSE (HSE) - MINISTERO DELLA SALUTE (IT MOH), PIC 999531942, linked to ISTITUTO SUPERIORE DI SANITA (ISS) - FONDAZIONE BRUNO KESSLER (FBK), PIC 999625450, linked to ISTITUTO SUPERIORE DI SANITA (ISS) - REGIONE LOMBARDIA (RLDGW), PIC 999654065, linked to ISTITUTO SUPERIORE DI SANITA (ISS) - PARTIKAS DROSIBAS, DZIVNIEKU VESELIBAS UN VIDES ZINATNISKAIS 29 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 INSTITUTSBIOR (BIOR), PIC 953459367, linked to SLIMIBU PROFILAKSES UN KONTROLES CENTRS (CDPC) - LATVIJAS BIOMEDICINAS PETIJUMU UN STUDIJU CENTRS (LBMC), PIC 998836646, linked to SLIMIBU PROFILAKSES UN KONTROLES CENTRS (CDPC) - NACIONALINE VISUOMENES SVEIKATOS PRIEZIUROS LABORATORIJA (NVSPL-LT), PIC 933651094, linked to NACIONALINIS VISUOMENES SVEIKATOS CENTRAS PRIE SVEIKATOS APSAUGOS MINISTERIJOS (NVSC-LT) - LABORATOIRE NATIONAL DE SANTE (LNS), PIC 911247586, linked to LUXEMBOURG INSTITUTE OF SCIENCE AND TECHNOLOGY (LIST) - VETERINAERINSTITUTTET (NVI), PIC 999511378, linked to FOLKEHELSEINSTITUTTET (NIPH) - MINISTERIO DA SAUDE - REPUBLICA PORTUGUESA (DGS), PIC 986364095, linked to INSTITUTO NACIONAL DE SAUDE DR. RICARDO JORGE (INSA) - ADP VALOR - SERVIÇOS AMBIENTAIS, S.A. (AdP VALOR), PIC 984102346, linked to INSTITUTO NACIONAL DE SAUDE DR. RICARDO JORGE (INSA) - NACIONALNI LABORATORIJ ZA ZDRAVJE, OKOLJE IN HRANO (NLZOH), PIC 949131227, linked to NACIONALNI INSTITUT ZA JAVNO ZDRAVJE (NIJZ) - AGENCIA ESPANOLA DE MEDICAMENTOS Y PRODUCTOS SANITARIOS (AEMPS), PIC 999563952, linked to INSTITUTO DE SALUD CARLOS III (ISCIII) - UNIVERSITAT DE BARCELONA (UB), PIC 999986387, linked to INSTITUTO DE SALUD CARLOS III (ISCIII) - UNIVERSIDAD DE SANTIAGO DE COMPOSTELA (USC), PIC 999829635, linked to INSTITUTO DE SALUD CARLOS III (ISCIII) - UNIVERSIDAD DE SALAMANCA (USAL), PIC 999846610, linked to INSTITUTO DE SALUD CARLOS III (ISCIII) - SVERIGES LANTBRUKSUNIVERSITET (SLU), PIC 999887350, linked to FOLKHALSOMYNDIGHETEN (PHAS) Affiliated entities can charge costs and contributions to the action under the same conditions as the beneficiaries and must implement the action tasks attributed to them in Annex 1 in accordance with Article 11. Their costs and contributions will be included in Annex 2 and will be taken into account for the calculation of the grant. The beneficiaries must ensure that all their obligations under this Agreement also apply to their affiliated entities. The beneficiaries must ensure that the bodies mentioned in Article 25 (e.g. granting authority, OLAF, Court of Auditors (ECA), etc.) can exercise their rights also towards the affiliated entities. 30 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Breaches by affiliated entities will be handled in the same manner as breaches by beneficiaries. Recovery of undue amounts will be handled through the beneficiaries. If the granting authority requires joint and several liability of affiliated entities (see Data Sheet, Point 4.4), they must sign the declaration set out in Annex 3a and may be held liable in case of enforced recoveries against their beneficiaries (see Article 22.2 and 22.4). ARTICLE 9 — OTHER PARTICIPANTS INVOLVED IN THE ACTION 9.1 Associated partners The following entities which cooperate with a beneficiary will participate in the action as ‘associated partners’: - ANA - AEROPORTOS DE PORTUGAL, SA (ANA), PIC 999943222 - AGENCIA PORTUGUESA DO AMBIENTE IP (APA), PIC 917950286 - MINISTERIO DE SANIDAD (CCAES), PIC 905231452 Associated partners must implement the action tasks attributed to them in Annex 1 in accordance with Article 11. They may not charge costs or contributions to the action and the costs for their tasks are not eligible. The tasks must be set out in Annex 1. The beneficiaries must ensure that their contractual obligations under Articles 11 (proper implementation), 12 (conflict of interests), 13 (confidentiality and security), 14 (ethics), 17.2 (visibility), 18 (specific rules for carrying out action), 19 (information) and 20 (record-keeping) also apply to the associated partners. The beneficiaries must ensure that the bodies mentioned in Article 25 (e.g. granting authority, OLAF, Court of Auditors (ECA), etc.) can exercise their rights also towards the associated partners. 9.2 Third parties giving in-kind contributions to the action Other third parties may give in-kind contributions to the action (i.e. personnel, equipment, other goods, works and services, etc. which are free-of-charge), if necessary for the implementation. Third parties giving in-kind contributions do not implement any action tasks. They may not charge costs or contributions to the action and the costs for the in-kind contributions are not eligible. The third parties and their in-kind contributions should be set out in Annex 1. 9.3 Subcontractors Subcontractors may participate in the action, if necessary for the implementation. Subcontractors must implement their action tasks in accordance with Article 11. The costs for the subcontracted tasks (invoiced price from the subcontractor) are eligible and may be charged by the beneficiaries, under the conditions set out in Article 6. The costs will be included in Annex 2 as part of the beneficiaries’ costs. 31 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 The beneficiaries must ensure that their contractual obligations under Articles 11 (proper implementation), 12 (conflict of interest), 13 (confidentiality and security), 14 (ethics), 17.2 (visibility), 18 (specific rules for carrying out action), 19 (information) and 20 (record-keeping) also apply to the subcontractors. The beneficiaries must ensure that the bodies mentioned in Article 25 (e.g. granting authority, OLAF, Court of Auditors (ECA), etc.) can exercise their rights also towards the subcontractors. 9.4 Recipients of financial support to third parties If the action includes providing financial support to third parties (e.g. grants, prizes or similar forms of support), the beneficiaries must ensure that their contractual obligations under Articles 12 (conflict of interest), 13 (confidentiality and security), 14 (ethics), 17.2 (visibility), 18 (specific rules for carrying out action), 19 (information) and 20 (record-keeping)also apply to the third parties receiving the support (recipients). The beneficiaries must also ensure that the bodies mentioned in Article 25 (e.g. granting authority, OLAF, Court of Auditors (ECA), etc.) can exercise their rights also towards the recipients. ARTICLE 10 — PARTICIPANTS WITH SPECIAL STATUS 10.1 Non-EU participants Participants which are established in a non-EU country (if any) undertake to comply with their obligations under the Agreement and: - to respect general principles (including fundamental rights, values and ethical principles, environmental and labour standards, rules on classified information, intellectual property rights, visibility of funding and protection of personal data) - for the submission of certificates under Article 24: to use qualified external auditors which are independent and comply with comparable standards as those set out in EU Directive 2006/43/EC16 - for the controls under Article 25: to allow for checks, reviews, audits and investigations (including on-the-spot checks, visits and inspections) by the bodies mentioned in that Article (e.g. granting authority, OLAF, Court of Auditors (ECA), etc.). Special rules on dispute settlement apply (see Data Sheet, Point 5). 10.2 Participants which are international organisations Participants which are international organisations (IOs; if any) undertake to comply with their obligations under the Agreement and: - to respect general principles (including fundamental rights, values and ethical principles, environmental and labour standards, rules on classified information, intellectual property rights, visibility of funding and protection of personal data) 16 Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of annual accounts and consolidated accounts or similar national regulations (OJ L 157, 9.6.2006, p. 87). 32 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 - for the submission of certificates under Article 24: to use either independent public officers or external auditors which comply with comparable standards as those set out in EU Directive 2006/43/EC - for the controls under Article 25: to allow for the checks, reviews, audits and investigations by the bodies mentioned in that Article, taking into account the specific agreements concluded by them and the EU (if any). For such participants, nothing in the Agreement will be interpreted as a waiver of their privileges or immunities, as accorded by their constituent documents or international law. Special rules on applicable law and dispute settlement apply (see Article 43 and Data Sheet, Point 5). 10.3 Pillar-assessed participants Pillar-assessed participants (if any) may rely on their own systems, rules and procedures, in so far as they have been positively assessed and do not call into question the decision awarding the grant or breach the principle of equal treatment of applicants or beneficiaries. ‘Pillar-assessment’ means a review by the European Commission on the systems, rules and procedures which participants use for managing EU grants (in particular internal control system, accounting system, external audits, financing of third parties, rules on recovery and exclusion, information on recipients and protection of personal data; see Article 154 EU Financial Regulation 2018/1046). Participants with a positive pillar assessment may rely on their own systems, rules and procedures, in particular for: - record-keeping (Article 20): may be done in accordance with internal standards, rules and procedures - currency conversion for financial statements (Article 21): may be done in accordance with usual accounting practices - guarantees (Article 23): for public law bodies, prefinancing guarantees are not needed - certificates (Article 24): - certificates on the financial statements (CFS): may be provided by their regular internal or external auditors and in accordance with their internal financial regulations and procedures - certificates on usual accounting practices (CoMUC): are not needed if those practices are covered by an ex-ante assessment and use the following specific rules, for: - recoveries (Article 22): in case of financial support to third parties, there will be no recovery if the participant has done everything possible to retrieve the undue amounts from the third party receiving the support (including legal proceedings) and non-recovery is not due to an error or negligence on its part - checks, reviews, audits and investigations by the EU (Article 25): will be conducted taking 33 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 into account the rules and procedures specifically agreed between them and the framework agreement (if any) - impact evaluation (Article 26): will be conducted in accordance with the participant’s internal rules and procedures and the framework agreement (if any) - grant agreement suspension (Article 31): certain costs incurred during grant suspension are eligible (notably, minimum costs necessary for a possible resumption of the action and costs relating to contracts which were entered into before the pre-information letter was received and which could not reasonably be suspended, reallocated or terminated on legal grounds) - grant agreement termination (Article 32): the final grant amount and final payment will be calculated taking into account also costs relating to contracts due for execution only after termination takes effect, if the contract was entered into before the pre-information letter was received and could not reasonably be terminated on legal grounds - liability for damages (Article 33.2): the granting authority must be compensated for damage it sustains as a result of the implementation of the action or because the action was not implemented in full compliance with the Agreement only if the damage is due to an infringement of the participant’s internal rules and procedures or due to a violation of third parties’ rights by the participant or one of its employees or individual for whom the employees are responsible. Participants whose pillar assessment covers procurement and granting procedures may also do purchases, subcontracting and financial support to third parties (Article 6.2) in accordance with their internal rules and procedures for purchases, subcontracting and financial support. Participants whose pillar assessment covers data protection rules may rely on their internal standards, rules and procedures for data protection (Article 15). The participants may however not rely on provisions which would breach the principle of equal treatment of applicants or beneficiaries or call into question the decision awarding the grant, such as in particular: - eligibility (Article 6) - consortium roles and set-up (Articles 7-9) - security and ethics (Articles 13, 14) - IPR (including background and results, access rights and rights of use), communication, dissemination and visibility (Articles 16 and 17) - information obligation (Article 19) - payment, reporting and amendments (Articles 21, 22 and 39) - rejections, reductions, suspensions and terminations (Articles 27, 28, 29-32) If the pillar assessment was subject to remedial measures, reliance on the internal systems, rules and procedures is subject to compliance with those remedial measures. 34 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Participants whose assessment has not yet been updated to cover (the new rules on) data protection may rely on their internal systems, rules and procedures, provided that they ensure that personal data is: - processed lawfully, fairly and in a transparent manner in relation to the data subject - collected for specified, explicit and legitimate purposes and not further processed in a manner that is incompatible with those purposes - adequate, relevant and limited to what is necessary in relation to the purposes for which they are processed - accurate and, where necessary, kept up to date - kept in a form which permits identification of data subjects for no longer than is necessary for the purposes for which the data is processed and - processed in a manner that ensures appropriate security of the personal data. Participants must inform the coordinator without delay of any changes to the systems, rules and procedures that were part of the pillar assessment. The coordinator must immediately inform the granting authority. Pillar-assessed participants that have also concluded a framework agreement with the EU, may moreover — under the same conditions as those above (i.e. not call into question the decision awarding the grant or breach the principle of equal treatment of applicants or beneficiaries) — rely on the provisions set out in that framework agreement. SECTION 2 RULES FOR CARRYING OUT THE ACTION ARTICLE 11 — PROPER IMPLEMENTATION OF THE ACTION 11.1 Obligation to properly implement the action The beneficiaries must implement the action as described in Annex 1 and in compliance with the provisions of the Agreement, the call conditions and all legal obligations under applicable EU, international and national law. 11.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 28). Such breaches may also lead to other measures described in Chapter 5. ARTICLE 12 — CONFLICT OF INTERESTS 12.1 Conflict of interests The beneficiaries must take all measures to prevent any situation where the impartial and objective implementation of the Agreement could be compromised for reasons involving family, emotional life, 35 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 political or national affinity, economic interest or any other direct or indirect interest (‘conflict of interests’). They must formally notify the granting authority without delay of any situation constituting or likely to lead to a conflict of interests and immediately take all the necessary steps to rectify this situation. The granting authority may verify that the measures taken are appropriate and may require additional measures to be taken by a specified deadline. 12.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 28) and the grant or the beneficiary may be terminated (see Article 32). Such breaches may also lead to other measures described in Chapter 5. ARTICLE 13 — CONFIDENTIALITY AND SECURITY 13.1 Sensitive information The parties must keep confidential any data, documents or other material (in any form) that is identified as sensitive in writing (‘sensitive information’) — during the implementation of the action and for at least until the time-limit set out in the Data Sheet (see Point 6). If a beneficiary requests, the granting authority may agree to keep such information confidential for a longer period. Unless otherwise agreed between the parties, they may use sensitive information only to implement the Agreement. The beneficiaries may disclose sensitive information to their personnel or other participants involved in the action only if they: (a) need to know it in order to implement the Agreement and (b) are bound by an obligation of confidentiality. The granting authority may disclose sensitive information to its staff and to other EU institutions and bodies. It may moreover disclose sensitive information to third parties, if: (a) this is necessary to implement the Agreement or safeguard the EU financial interests and (b) the recipients of the information are bound by an obligation of confidentiality. The confidentiality obligations no longer apply if: (a) the disclosing party agrees to release the other party (b) the information becomes publicly available, without breaching any confidentiality obligation (c) the disclosure of the sensitive information is required by EU, international or national law. 36 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Specific confidentiality rules (if any) are set out in Annex 5. 13.2 Classified information The parties must handle classified information in accordance with the applicable EU, international or national law on classified information (in particular, Decision 2015/44417 and its implementing rules). Deliverables which contain classified information must be submitted according to special procedures agreed with the granting authority. Action tasks involving classified information may be subcontracted only after explicit approval (in writing) from the granting authority. Classified information may not be disclosed to any third party (including participants involved in the action implementation) without prior explicit written approval from the granting authority. Specific security rules (if any) are set out in Annex 5. 13.3 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 28). Such breaches may also lead to other measures described in Chapter 5. ARTICLE 14 — ETHICS AND VALUES 14.1 Ethics The action must be carried out in line with the highest ethical standards and the applicable EU, international and national law on ethical principles. Specific ethics rules (if any) are set out in Annex 5. 14.2 Values The beneficiaries must commit to and ensure the respect of basic EU values (such as respect for human dignity, freedom, democracy, equality, the rule of law and human rights, including the rights of minorities). Specific rules on values (if any) are set out in Annex 5. 14.3 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 28). Such breaches may also lead to other measures described in Chapter 5. 17 Commission Decision 2015/444/EC, Euratom of 13 March 2015 on the security rules for protecting EU classified information (OJ L 72, 17.3.2015, p. 53). 37 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 ARTICLE 15 — DATA PROTECTION 15.1 Data processing by the granting authority Any personal data under the Agreement will be processed under the responsibility of the data controller of the granting authority in accordance with and for the purposes set out in the Portal Privacy Statement. For grants where the granting authority is the European Commission, an EU regulatory or executive agency, joint undertaking or other EU body, the processing will be subject to Regulation 2018/172518. 15.2 Data processing by the beneficiaries The beneficiaries must process personal data under the Agreement in compliance with the applicable EU, international and national law on data protection (in particular, Regulation 2016/67919). They must ensure that personal data is: - processed lawfully, fairly and in a transparent manner in relation to the data subjects - collected for specified, explicit and legitimate purposes and not further processed in a manner that is incompatible with those purposes - adequate, relevant and limited to what is necessary in relation to the purposes for which they are processed - accurate and, where necessary, kept up to date - kept in a form which permits identification of data subjects for no longer than is necessary for the purposes for which the data is processed and - processed in a manner that ensures appropriate security of the data. The beneficiaries may grant their personnel access to personal data only if it is strictly necessary for implementing, managing and monitoring the Agreement. The beneficiaries must ensure that the personnel is under a confidentiality obligation. The beneficiaries must inform the persons whose data are transferred to the granting authority and provide them with the Portal Privacy Statement. 15.3 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 28). 18 Regulation (EU) 2018/1725 of the European Parliament and of the Council of 23 October 2018 on the protection of natural persons with regard to the processing of personal data by the Union institutions, bodies, offices and agencies and on the free movement of such data, and repealing Regulation (EC) No 45/2001 and Decision No 1247/2002/EC (OJ L 295, 21.11.2018, p. 39). 19 Regulation (EU) 2016/679 of the European Parliament and of the Council of 27 April 2016 on the protection of natural persons with regard to the processing of personal data and on the free movement of such data, and repealing Directive 95/46/EC (‘GDPR’) (OJ L 119, 4.5.2016, p. 1). 38 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Such breaches may also lead to other measures described in Chapter 5. ARTICLE 16 — INTELLECTUAL PROPERTY RIGHTS (IPR) — BACKGROUND AND RESULTS —ACCESS RIGHTS AND RIGHTS OF USE 16.1 Background and access rights to background The beneficiaries must give each other and the other participants access to the background identified as needed for implementing the action, subject to any specific rules in Annex 5. ‘Background’ means any data, know-how or information — whatever its form or nature (tangible or intangible), including any rights such as intellectual property rights — that is: (a) held by the beneficiaries before they acceded to the Agreement and (b) needed to implement the action or exploit the results. If background is subject to rights of a third party, the beneficiary concerned must ensure that it is able to comply with its obligations under the Agreement. 16.2 Ownership of results The granting authority does not obtain ownership of the results produced under the action. ‘Results’ means any tangible or intangible effect of the action, such as data, know-how or information, whatever its form or nature, whether or not it can be protected, as well as any rights attached to it, including intellectual property rights. 16.3 Rights of use of the granting authority on materials, documents and information received for policy, information, communication, dissemination and publicity purposes The granting authority has the right to use non-sensitive information relating to the action and materials and documents received from the beneficiaries (notably summaries for publication, deliverables, as well as any other material, such as pictures or audio-visual material, in paper or electronic form) for policy, information, communication, dissemination and publicity purposes — during the action or afterwards. The right to use the beneficiaries’ materials, documents and information is granted in the form of a royalty-free, non-exclusive and irrevocable licence, which includes the following rights: (a) use for its own purposes (in particular, making them available to persons working for the granting authority or any other EU service (including institutions, bodies, offices, agencies, etc.) or EU Member State institution or body; copying or reproducing them in whole or in part, in unlimited numbers; and communication through press information services) (b) distribution to the public (in particular, publication as hard copies and in electronic or digital format, publication on the internet, as a downloadable or non-downloadable file, broadcasting by any channel, public display or presentation, communicating through press information services, or inclusion in widely accessible databases or indexes) (c) editing or redrafting (including shortening, summarising, inserting other elements (e.g. 39 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 meta-data, legends, other graphic, visual, audio or text elements), extracting parts (e.g. audio or video files), dividing into parts, use in a compilation) (d) translation (e) storage in paper, electronic or other form (f) archiving, in line with applicable document-management rules (g) the right to authorise third parties to act on its behalf or sub-license to third parties the modes of use set out in Points (b), (c), (d) and (f), if needed for the information, communication and publicity activity of the granting authority (h) processing, analysing, aggregating the materials, documents and information received and producing derivative works. The rights of use are granted for the whole duration of the industrial or intellectual property rights concerned. If materials or documents are subject to moral rights or third party rights (including intellectual property rights or rights of natural persons on their image and voice), the beneficiaries must ensure that they comply with their obligations under this Agreement (in particular, by obtaining the necessary licences and authorisations from the rights holders concerned). Where applicable, the granting authority will insert the following information: “© – [year] – [name of the copyright owner]. All rights reserved. Licensed to the [name of granting authority] under conditions.” 16.4 Specific rules on IPR, results and background Specific rules regarding intellectual property rights, results and background (if any) are set out in Annex 5. 16.5 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 28). Such a breach may also lead to other measures described in Chapter 5. ARTICLE 17 — COMMUNICATION, DISSEMINATION AND VISIBILITY 17.1 Communication — Dissemination — Promoting the action Unless otherwise agreed with the granting authority, the beneficiaries must promote the action and its results by providing targeted information to multiple audiences (including the media and the public), in accordance with Annex 1 and in a strategic, coherent and effective manner. Before engaging in a communication or dissemination activity expected to have a major media impact, the beneficiaries must inform the granting authority. 40 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 17.2 Visibility — European flag and funding statement Unless otherwise agreed with the granting authority, communication activities of the beneficiaries related to the action (including media relations, conferences, seminars, information material, such as brochures, leaflets, posters, presentations, etc., in electronic form, via traditional or social media, etc.), dissemination activities and any infrastructure, equipment, vehicles, supplies or major result funded by the grant must acknowledge EU support and display the European flag (emblem) and funding statement (translated into local languages, where appropriate): The emblem must remain distinct and separate and cannot be modified by adding other visual marks, brands or text. Apart from the emblem, no other visual identity or logo may be used to highlight the EU support. When displayed in association with other logos (e.g. of beneficiaries or sponsors), the emblem must be displayed at least as prominently and visibly as the other logos. For the purposes of their obligations under this Article, the beneficiaries may use the emblem without first obtaining approval from the granting authority. This does not, however, give them the right to exclusive use. Moreover, they may not appropriate the emblem or any similar trademark or logo, either by registration or by any other means. 17.3 Quality of information — Disclaimer Any communication or dissemination activity related to the action must use factually accurate information. Moreover, it must indicate the following disclaimer (translated into local languages where appropriate): 41 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 “Funded by the European Union. Views and opinions expressed are however those of the author(s) only and do not necessarily reflect those of the European Union or [name of the granting authority]. Neither the European Union nor the granting authority can be held responsible for them.” 17.4 Specific communication, dissemination and visibility rules Specific communication, dissemination and visibility rules (if any) are set out in Annex 5. 17.5 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 28). Such breaches may also lead to other measures described in Chapter 5. ARTICLE 18 — SPECIFIC RULES FOR CARRYING OUT THE ACTION 18.1 Specific rules for carrying out the action Specific rules for implementing the action (if any) are set out in Annex 5. 18.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 28). Such a breach may also lead to other measures described in Chapter 5. SECTION 3 GRANT ADMINISTRATION ARTICLE 19 — GENERAL INFORMATION OBLIGATIONS 19.1 Information requests The beneficiaries must provide — during the action or afterwards and in accordance with Article 7 — any information requested in order to verify eligibility of the costs or contributions declared, proper implementation of the action and compliance with the other obligations under the Agreement. The information provided must be accurate, precise and complete and in the format requested, including electronic format. 19.2 Participant Register data updates The beneficiaries must keep — at all times, during the action or afterwards — their information stored in the Portal Participant Register up to date, in particular, their name, address, legal representatives, legal form and organisation type. 19.3 Information about events and circumstances which impact the action The beneficiaries must immediately inform the granting authority (and the other beneficiaries) of any of the following: 42 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 (a) events which are likely to affect or delay the implementation of the action or affect the EU’s financial interests, in particular: (i) changes in their legal, financial, technical, organisational or ownership situation (including changes linked to one of the exclusion grounds listed in the declaration of honour signed before grant signature) (ii) linked action information: not applicable (b) circumstances affecting: (i) the decision to award the grant or (ii) compliance with requirements under the Agreement. 19.4 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 28). Such breaches may also lead to other measures described in Chapter 5. ARTICLE 20 — RECORD-KEEPING 20.1 Keeping records and supporting documents The beneficiaries must — at least until the time-limit set out in the Data Sheet (see Point 6) — keep records and other supporting documents to prove the proper implementation of the action in line with the accepted standards in the respective field (if any). In addition, the beneficiaries must — for the same period — keep the following to justify the amounts declared: (a) for actual costs: adequate records and supporting documents to prove the costs declared (such as contracts, subcontracts, invoices and accounting records); in addition, the beneficiaries’ usual accounting and internal control procedures must enable direct reconciliation between the amounts declared, the amounts recorded in their accounts and the amounts stated in the supporting documents (b) for flat-rate costs and contributions (if any): adequate records and supporting documents to prove the eligibility of the costs or contributions to which the flat-rate is applied (c) for the following simplified costs and contributions: the beneficiaries do not need to keep specific records on the actual costs incurred, but must keep: (i) for unit costs and contributions (if any): adequate records and supporting documents to prove the number of units declared (ii) for lump sum costs and contributions (if any): adequate records and supporting documents to prove proper implementation of the work as described in Annex 1 (iii) for financing not linked to costs (if any): adequate records and supporting documents 43 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 to prove the achievement of the results or the fulfilment of the conditions as described in Annex 1 (d) for unit, flat-rate and lump sum costs and contributions according to usual cost accounting practices (if any): the beneficiaries must keep any adequate records and supporting documents to prove that their cost accounting practices have been applied in a consistent manner, based on objective criteria, regardless of the source of funding, and that they comply with the eligibility conditions set out in Articles 6.1 and 6.2. Moreover, the following is needed for specific budget categories: (e) for personnel costs: time worked for the beneficiary under the action must be supported by declarations signed monthly by the person and their supervisor, unless another reliable time-record system is in place; the granting authority may accept alternative evidence supporting the time worked for the action declared, if it considers that it offers an adequate level of assurance (f) additional record-keeping rules: not applicable The records and supporting documents must be made available upon request (see Article 19) or in the context of checks, reviews, audits or investigations (see Article 25). If there are on-going checks, reviews, audits, investigations, litigation or other pursuits of claims under the Agreement (including the extension of findings; see Article 25), the beneficiaries must keep these records and other supporting documentation until the end of these procedures. The beneficiaries must keep the original documents. Digital and digitalised documents are considered originals if they are authorised by the applicable national law. The granting authority may accept non-original documents if they offer a comparable level of assurance. 20.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, costs or contributions insufficiently substantiated will be ineligible (see Article 6) and will be rejected (see Article 27), and the grant may be reduced (see Article 28). Such breaches may also lead to other measures described in Chapter 5. ARTICLE 21 — REPORTING 21.1 Continuous reporting The beneficiaries must continuously report on the progress of the action (e.g. deliverables, milestones, outputs/outcomes, critical risks, indicators, etc; if any), in the Portal Continuous Reporting tool and in accordance with the timing and conditions it sets out (as agreed with the granting authority). Standardised deliverables (e.g. progress reports not linked to payments, reports on cumulative expenditure, special reports, etc; if any) must be submitted using the templates published on the Portal. 21.2 Periodic reporting: Technical reports and financial statements 44 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 In addition, the beneficiaries must provide reports to request payments, in accordance with the schedule and modalities set out in the Data Sheet (see Point 4.2): - for additional prefinancings (if any): an additional prefinancing report - for interim payments (if any) and the final payment: a periodic report. The prefinancing and periodic reports include a technical and financial part. The technical part includes an overview of the action implementation. It must be prepared using the template available in the Portal Periodic Reporting tool. The financial part of the additional prefinancing report includes a statement on the use of the previous prefinancing payment. The financial part of the periodic report includes: - the financial statements (individual and consolidated; for all beneficiaries/affiliated entities) - the explanation on the use of resources (or detailed cost reporting table, if required) - the certificates on the financial statements (CFS) (if required; see Article 24.2 and Data Sheet, Point 4.3). The financial statements must detail the eligible costs and contributions for each budget category and, for the final payment, also the revenues for the action (see Articles 6 and 22). All eligible costs and contributions incurred should be declared, even if they exceed the amounts indicated in the estimated budget (see Annex 2). Amounts that are not declared in the individual financial statements will not be taken into account by the granting authority. By signing the financial statements (directly in the Portal Periodic Reporting tool), the beneficiaries confirm that: - the information provided is complete, reliable and true - the costs and contributions declared are eligible (see Article 6) - the costs and contributions can be substantiated by adequate records and supporting documents (see Article 20) that will be produced upon request (see Article 19) or in the context of checks, reviews, audits and investigations (see Article 25) - for the final periodic report: all the revenues have been declared (if required; see Article 22). Beneficiaries will have to submit also the financial statements of their affiliated entities (if any). In case of recoveries (see Article 22), beneficiaries will be held responsible also for the financial statements of their affiliated entities. 21.3 Currency for financial statements and conversion into euros The financial statements must be drafted in euro. Beneficiaries with general accounts established in a currency other than the euro must convert the 45 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 costs recorded in their accounts into euro, at the average of the daily exchange rates published in the C series of the Official Journal of the European Union (ECB website), calculated over the corresponding reporting period. If no daily euro exchange rate is published in the Official Journal for the currency in question, they must be converted at the average of the monthly accounting exchange rates published on the European Commission website (InforEuro), calculated over the corresponding reporting period. Beneficiaries with general accounts in euro must convert costs incurred in another currency into euro according to their usual accounting practices. 21.4 Reporting language The reporting must be in the language of the Agreement, unless otherwise agreed with the granting authority (see Data Sheet, Point 4.2). 21.5 Consequences of non-compliance If a report submitted does not comply with this Article, the granting authority may suspend the payment deadline (see Article 29) and apply other measures described in Chapter 5. If the coordinator breaches its reporting obligations, the granting authority may terminate the grant or the coordinator’s participation (see Article 32) or apply other measures described in Chapter 5. ARTICLE 22 — PAYMENTS AND RECOVERIES — CALCULATION OF AMOUNTS DUE 22.1 Payments and payment arrangements Payments will be made in accordance with the schedule and modalities set out in the Data Sheet (see Point 4.2). They will be made in euro to the bank account indicated by the coordinator (see Data Sheet, Point 4.2) and must be distributed without unjustified delay (restrictions may apply to distribution of the initial prefinancing payment; see Data Sheet, Point 4.2). Payments to this bank account will discharge the granting authority from its payment obligation. The cost of payment transfers will be borne as follows: - the granting authority bears the cost of transfers charged by its bank - the beneficiary bears the cost of transfers charged by its bank - the party causing a repetition of a transfer bears all costs of the repeated transfer. Payments by the granting authority will be considered to have been carried out on the date when they are debited to its account. 22.2 Recoveries 46 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Recoveries will be made, if — at beneficiary termination, final payment or afterwards — it turns out that the granting authority has paid too much and needs to recover the amounts undue. The general liability regime for recoveries (first-line liability) is as follows: At final payment, the coordinator will be fully liable for recoveries, even if it has not been the final recipient of the undue amounts. At beneficiary termination or after final payment, recoveries will be made directly against the beneficiaries concerned. Beneficiaries will be fully liable for repaying the debts of their affiliated entities. In case of enforced recoveries (see Article 22.4): - the beneficiaries will be jointly and severally liable for repaying debts of another beneficiary under the Agreement (including late-payment interest), if required by the granting authority (see Data Sheet, Point 4.4) - affiliated entities will be held liable for repaying debts of their beneficiaries under the Agreement (including late-payment interest), if required by the granting authority (see Data Sheet, Point 4.4). 22.3 Amounts due 22.3.1 Prefinancing payments The aim of the prefinancing is to provide the beneficiaries with a float. It remains the property of the EU until the final payment. For initial prefinancings (if any), the amount due, schedule and modalities are set out in the Data Sheet (see Point 4.2). For additional prefinancings (if any), the amount due, schedule and modalities are also set out in the Data Sheet (see Point 4.2). However, if the statement on the use of the previous prefinancing payment shows that less than 70% was used, the amount set out in the Data Sheet will be reduced by the difference between the 70% threshold and the amount used. Prefinancing payments (or parts of them) may be offset (without the beneficiaries’ consent) against amounts owed by a beneficiary to the granting authority — up to the amount due to that beneficiary. For grants where the granting authority is the European Commission or an EU executive agency, offsetting may also be done against amounts owed to other Commission services or executive agencies. Payments will not be made if the payment deadline or payments are suspended (see Articles 29 and 30). 22.3.2 Amount due at beneficiary termination — Recovery In case of beneficiary termination, the granting authority will determine the provisional amount due for the beneficiary concerned. Payments (if any) will be made with the next interim or final payment. The amount due will be calculated in the following step: 47 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Step 1 — Calculation of the total accepted EU contribution Step 1 — Calculation of the total accepted EU contribution The granting authority will first calculate the ‘accepted EU contribution’ for the beneficiary for all reporting periods, by calculating the ‘maximum EU contribution to costs’ (applying the funding rate to the accepted costs of the beneficiary), taking into account requests for a lower contribution to costs and CFS threshold cappings (if any; see Article 24.5) and adding the contributions (accepted unit, flat-rate or lump sum contributions and financing not linked to costs, if any). After that, the granting authority will take into account grant reductions (if any). The resulting amount is the ‘total accepted EU contribution’ for the beneficiary. The balance is then calculated by deducting the payments received (if any; see report on the distribution of payments in Article 32), from the total accepted EU contribution: {total accepted EU contribution for the beneficiary minus {prefinancing and interim payments received (if any)}}. If the balance is positive, the amount will be included in the next interim or final payment to the consortium. If the balance is negative, it will be recovered in accordance with the following procedure: The granting authority will send a pre-information letter to the beneficiary concerned: - formally notifying the intention to recover, the amount due, the amount to be recovered and the reasons why and - requesting observations within 30 days of receiving notification. If no observations are submitted (or the granting authority decides to pursue recovery despite the observations it has received), it will confirm the amount to be recovered and ask this amount to be paid to the coordinator (confirmation letter). The amounts will later on also be taken into account for the next interim or final payment. 22.3.3 Interim payments Interim payments reimburse the eligible costs and contributions claimed for the implementation of the action during the reporting periods (if any). Interim payments (if any) will be made in accordance with the schedule and modalities set out the Data Sheet (see Point 4.2). Payment is subject to the approval of the periodic report. Its approval does not imply recognition of compliance, authenticity, completeness or correctness of its content. The interim payment will be calculated by the granting authority in the following steps: Step 1 — Calculation of the total accepted EU contribution 48 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Step 2 — Limit to the interim payment ceiling Step 1 — Calculation of the total accepted EU contribution The granting authority will calculate the ‘accepted EU contribution’ for the action for the reporting period, by first calculating the ‘maximum EU contribution to costs’ (applying the funding rate to the accepted costs of each beneficiary), taking into account requests for a lower contribution to costs, and CFS threshold cappings (if any; see Article 24.5) and adding the contributions (accepted unit, flat-rate or lump sum contributions and financing not linked to costs, if any). After that, the granting authority will take into account grant reductions from beneficiary termination (if any). The resulting amount is the ‘total accepted EU contribution’. Step 2 — Limit to the interim payment ceiling The resulting amount is then capped to ensure that the total amount of prefinancing and interim payments (if any) does not exceed the interim payment ceiling set out in the Data Sheet (see Point 4.2). Interim payments (or parts of them) may be offset (without the beneficiaries’ consent) against amounts owed by a beneficiary to the granting authority — up to the amount due to that beneficiary. For grants where the granting authority is the European Commission or an EU executive agency, offsetting may also be done against amounts owed to other Commission services or executive agencies. Payments will not be made if the payment deadline or payments are suspended (see Articles 29 and 30). 22.3.4 Final payment — Final grant amount — Revenues and Profit — Recovery The final payment (payment of the balance) reimburses the remaining part of the eligible costs and contributions claimed for the implementation of the action (if any). The final payment will be made in accordance with the schedule and modalities set out in the Data Sheet (see Point 4.2). Payment is subject to the approval of the final periodic report. Its approval does not imply recognition of compliance, authenticity, completeness or correctness of its content. The final grant amount for the action will be calculated in the following steps: Step 1 — Calculation of the total accepted EU contribution Step 2 — Limit to the maximum grant amount Step 3 — Reduction due to the no-profit rule Step 1 — Calculation of the total accepted EU contribution The granting authority will first calculate the ‘accepted EU contribution’ for the action for all reporting periods, by calculating the ‘maximum EU contribution to costs’ (applying the funding rate to the total accepted costs of each beneficiary), taking into account requests for a lower contribution to costs, CFS 49 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 threshold cappings (if any; see Article 24.5) and adding the contributions (accepted unit, flat-rate or lump sum contributions and financing not linked to costs, if any). After that, the granting authority will take into account grant reductions (if any). The resulting amount is the ‘total accepted EU contribution’. Step 2 — Limit to the maximum grant amount If the resulting amount is higher than the maximum grant amount set out in Article 5.2, it will be limited to the latter. Step 3 — Reduction due to the no-profit rule If the no-profit rule is provided for in the Data Sheet (see Point 4.2), the grant must not produce a profit (i.e. surplus of the amount obtained following Step 2 plus the action’s revenues, over the eligible costs and contributions approved by the granting authority). ‘Revenue’ is all income generated by the action, during its duration (see Article 4), for beneficiaries that are profit legal entities. If there is a profit, it will be deducted in proportion to the final rate of reimbursement of the eligible costs approved by the granting authority (as compared to the amount calculated following Steps 1 and 2 minus the contributions). The balance (final payment) is then calculated by deducting the total amount of prefinancing and interim payments already made (if any), from the final grant amount: {final grant amount minus {prefinancing and interim payments made (if any)}}. If the balance is positive, it will be paid to the coordinator. The final payment (or part of it) may be offset (without the beneficiaries’ consent) against amounts owed by a beneficiary to the granting authority — up to the amount due to that beneficiary. For grants where the granting authority is the European Commission or an EU executive agency, offsetting may also be done against amounts owed to other Commission services or executive agencies. Payments will not be made if the payment deadline or payments are suspended (see Articles 29 and 30). If the balance is negative, it will be recovered in accordance with the following procedure: The granting authority will send a pre-information letter to the coordinator: - formally notifying the intention to recover, the final grant amount, the amount to be recovered and the reasons why - requesting observations within 30 days of receiving notification. 50 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 If no observations are submitted (or the granting authority decides to pursue recovery despite the observations it has received), it will confirm the amount to be recovered (confirmation letter), together with a debit note with the terms and date for payment. If payment is not made by the date specified in the debit note, the granting authority will enforce recovery in accordance with Article 22.4. 22.3.5 Audit implementation after final payment — Revised final grant amount — Recovery If — after the final payment (in particular, after checks, reviews, audits or investigations; see Article 25) — the granting authority rejects costs or contributions (see Article 27) or reduces the grant (see Article 28), it will calculate the revised final grant amount for the beneficiary concerned. The beneficiary revised final grant amount will be calculated in the following step: Step 1 — Calculation of the revised total accepted EU contribution Step 1 — Calculation of the revised total accepted EU contribution The granting authority will first calculate the ‘revised accepted EU contribution’ for the beneficiary, by calculating the ‘revised accepted costs’ and ‘revised accepted contributions’. After that, it will take into account grant reductions (if any). The resulting ‘revised total accepted EU contribution’ is the beneficiary revised final grant amount. If the revised final grant amount is lower than the beneficiary’s final grant amount (i.e. its share in the final grant amount for the action), it will be recovered in accordance with the following procedure: The beneficiary final grant amount (i.e. share in the final grant amount for the action) is calculated as follows: {{total accepted EU contribution for the beneficiary divided by total accepted EU contribution for the action} multiplied by final grant amount for the action}. The granting authority will send a pre-information letter to the beneficiary concerned: - formally notifying the intention to recover, the amount to be recovered and the reasons why and - requesting observations within 30 days of receiving notification. If no observations are submitted (or the granting authority decides to pursue recovery despite the observations it has received), it will confirm the amount to be recovered (confirmation letter), together with a debit note with the terms and the date for payment. Recoveries against affiliated entities (if any) will be handled through their beneficiaries. If payment is not made by the date specified in the debit note, the granting authority will enforce recovery in accordance with Article 22.4. 51 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 22.4 Enforced recovery If payment is not made by the date specified in the debit note, the amount due will be recovered: (a) by offsetting the amount — without the coordinator or beneficiary’s consent — against any amounts owed to the coordinator or beneficiary by the granting authority. In exceptional circumstances, to safeguard the EU financial interests, the amount may be offset before the payment date specified in the debit note. For grants where the granting authority is the European Commission or an EU executive agency, debts may also be offset against amounts owed by other Commission services or executive agencies. (b) by drawing on the financial guarantee(s) (if any) (c) by holding other beneficiaries jointly and severally liable (if any; see Data Sheet, Point 4.4) (d) by holding affiliated entities jointly and severally liable (if any, see Data Sheet, Point 4.4) (e) by taking legal action (see Article 43) or, provided that the granting authority is the European Commission or an EU executive agency, by adopting an enforceable decision under Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 100(2) of EU Financial Regulation 2018/1046. The amount to be recovered will be increased by late-payment interest at the rate set out in Article 22.5, from the day following the payment date in the debit note, up to and including the date the full payment is received. Partial payments will be first credited against expenses, charges and late-payment interest and then against the principal. Bank charges incurred in the recovery process will be borne by the beneficiary, unless Directive 2015/236620 applies. For grants where the granting authority is an EU executive agency, enforced recovery by offsetting or enforceable decision will be done by the services of the European Commission (see also Article 43). 22.5 Consequences of non-compliance 22.5.1 If the granting authority does not pay within the payment deadlines (see above), the beneficiaries are entitled to late-payment interest at the rate applied by the European Central Bank (ECB) for its main refinancing operations in euros (‘reference rate’), plus the rate specified in the Data Sheet (Point 4.2). The reference rate is the rate in force on the first day of the month in which the payment deadline expires, as published in the C series of the Official Journal of the European Union. If the late-payment interest is lower than or equal to EUR 200, it will be paid to the coordinator only on request submitted within two months of receiving the late payment. 20 Directive (EU) 2015/2366 of the European Parliament and of the Council of 25 November 2015 on payment services in the internal market, amending Directives 2002/65/EC, 2009/110/EC and 2013/36/EU and Regulation (EU) No 1093/2010, and repealing Directive 2007/64/EC (OJ L 337, 23.12.2015, p. 35). 52 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Late-payment interest is not due if all beneficiaries are EU Member States (including regional and local government authorities or other public bodies acting on behalf of a Member State for the purpose of this Agreement). If payments or the payment deadline are suspended (see Articles 29 and 30), payment will not be considered as late. Late-payment interest covers the period running from the day following the due date for payment (see above), up to and including the date of payment. Late-payment interest is not considered for the purposes of calculating the final grant amount. 22.5.2 If the coordinator breaches any of its obligations under this Article, the grant may be reduced (see Article 28) and the grant or the coordinator may be terminated (see Article 32). Such breaches may also lead to other measures described in Chapter 5. ARTICLE 23 — GUARANTEES 23.1 Prefinancing guarantee If required by the granting authority (see Data Sheet, Point 4.2), the beneficiaries must provide (one or more) prefinancing guarantee(s) in accordance with the timing and the amounts set out in the Data Sheet. The coordinator must submit them to the granting authority in due time before the prefinancing they are linked to. The guarantees must be drawn up using the template published on the Portal and fulfil the following conditions: (a) be provided by a bank or approved financial institution established in the EU or — if requested by the coordinator and accepted by the granting authority — by a third party or a bank or financial institution established outside the EU offering equivalent security (b) the guarantor stands as first-call guarantor and does not require the granting authority to first have recourse against the principal debtor (i.e. the beneficiary concerned) and (c) remain explicitly in force until the final payment and, if the final payment takes the form of a recovery, until five months after the debit note is notified to a beneficiary. They will be released within the following month. 23.2 Consequences of non-compliance If the beneficiaries breach their obligation to provide the prefinancing guarantee, the prefinancing will not be paid. Such breaches may also lead to other measures described in Chapter 5. ARTICLE 24 — CERTIFICATES 53 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 24.1 Operational verification report (OVR) Not applicable 24.2 Certificate on the financial statements (CFS) If required by the granting authority (see Data Sheet, Point 4.3), the beneficiaries must provide certificates on their financial statements (CFS), in accordance with the schedule, threshold and conditions set out in the Data Sheet. The coordinator must submit them as part of the periodic report (see Article 21). The certificates must be drawn up using the template published on the Portal, cover the costs declared on the basis of actual costs and costs according to usual cost accounting practices (if any), and fulfil the following conditions: (a) be provided by a qualified approved external auditor which is independent and complies with Directive 2006/43/EC21 (or for public bodies: by a competent independent public officer) (b) the verification must be carried out according to the highest professional standards to ensure that the financial statements comply with the provisions under the Agreement and that the costs declared are eligible. The certificates will not affect the granting authority's right to carry out its own checks, reviews or audits, nor preclude the European Court of Auditors (ECA), the European Public Prosecutor’s Office (EPPO) or the European Anti-Fraud Office (OLAF) from using their prerogatives for audits and investigations under the Agreement (see Article 25). If the costs (or a part of them) were already audited by the granting authority, these costs do not need to be covered by the certificate and will not be counted for calculating the threshold (if any). 24.3 Certificate on the compliance of usual cost accounting practices (CoMUC) Not applicable 24.4 Systems and process audit (SPA) Not applicable 24.5 Consequences of non-compliance If a beneficiary does not submit a certificate on the financial statements (CFS) or the certificate is rejected, the accepted EU contribution to costs will be capped to reflect the CFS threshold. If a beneficiary breaches any of its other obligations under this Article, the granting authority may apply the measures described in Chapter 5. ARTICLE 25 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF FINDINGS 21 Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of annual accounts and consolidated accounts or similar national regulations (OJ L 157, 9.6.2006, p. 87). 54 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 25.1 Granting authority checks, reviews and audits 25.1.1 Internal checks The granting authority may — during the action or afterwards — check the proper implementation of the action and compliance with the obligations under the Agreement, including assessing costs and contributions, deliverables and reports. 25.1.2 Project reviews The granting authority may carry out reviews on the proper implementation of the action and compliance with the obligations under the Agreement (general project reviews or specific issues reviews). Such project reviews may be started during the implementation of the action and until the time-limit set out in the Data Sheet (see Point 6). They will be formally notified to the coordinator or beneficiary concerned and will be considered to start on the date of the notification. If needed, the granting authority may be assisted by independent, outside experts. If it uses outside experts, the coordinator or beneficiary concerned will be informed and have the right to object on grounds of commercial confidentiality or conflict of interest. The coordinator or beneficiary concerned must cooperate diligently and provide — within the deadline requested — any information and data in addition to deliverables and reports already submitted (including information on the use of resources). The granting authority may request beneficiaries to provide such information to it directly. Sensitive information and documents will be treated in accordance with Article 13. The coordinator or beneficiary concerned may be requested to participate in meetings, including with the outside experts. For on-the-spot visits, the beneficiary concerned must allow access to sites and premises (including to the outside experts) and must ensure that information requested is readily available. Information provided must be accurate, precise and complete and in the format requested, including electronic format. On the basis of the review findings, a project review report will be drawn up. The granting authority will formally notify the project review report to the coordinator or beneficiary concerned, which has 30 days from receiving notification to make observations. Project reviews (including project review reports) will be in the language of the Agreement, unless otherwise agreed with the granting authority (see Data Sheet, Point 4.2). 25.1.3 Audits The granting authority may carry out audits on the proper implementation of the action and compliance with the obligations under the Agreement. Such audits may be started during the implementation of the action and until the time-limit set out in the Data Sheet (see Point 6). They will be formally notified to the beneficiary concerned and will be considered to start on the date of the notification. 55 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 The granting authority may use its own audit service, delegate audits to a centralised service or use external audit firms. If it uses an external firm, the beneficiary concerned will be informed and have the right to object on grounds of commercial confidentiality or conflict of interest. The beneficiary concerned must cooperate diligently and provide — within the deadline requested — any information (including complete accounts, individual salary statements or other personal data) to verify compliance with the Agreement. Sensitive information and documents will be treated in accordance with Article 13. For on-the-spot visits, the beneficiary concerned must allow access to sites and premises (including for the external audit firm) and must ensure that information requested is readily available. Information provided must be accurate, precise and complete and in the format requested, including electronic format. On the basis of the audit findings, a draft audit report will be drawn up. The auditors will formally notify the draft audit report to the beneficiary concerned, which has 30 days from receiving notification to make observations (contradictory audit procedure). The final audit report will take into account observations by the beneficiary concerned and will be formally notified to them. Audits (including audit reports) will be in the language of the Agreement, unless otherwise agreed with the granting authority (see Data Sheet, Point 4.2). 25.2 European Commission checks, reviews and audits in grants of other granting authorities Where the granting authority is not the European Commission, the latter has the same rights of checks, reviews and audits as the granting authority. 25.3 Access to records for assessing simplified forms of funding The beneficiaries must give the European Commission access to their statutory records for the periodic assessment of simplified forms of funding which are used in EU programmes. 25.4 OLAF, EPPO and ECA audits and investigations The following bodies may also carry out checks, reviews, audits and investigations — during the action or afterwards: - the European Anti-Fraud Office (OLAF) under Regulations No 883/201322 and No 2185/9623 - the European Public Prosecutor’s Office (EPPO) under Regulation 2017/1939 22 Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013 concerning investigations conducted by the European Anti-Fraud Office (OLAF) and repealing Regulation (EC) No 1073/1999 of the European Parliament and of the Council and Council Regulation (Euratom) No 1074/1999 (OJ L 248, 18/09/2013, p. 1). 23 Council Regulation (Euratom, EC) No 2185/96 of 11 November 1996 concerning on-the-spot checks and inspections carried out by the Commission in order to protect the European Communities' financial interests against fraud and other irregularities (OJ L 292, 15/11/1996, p. 2). 56 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 - the European Court of Auditors (ECA) under Article 287 of the Treaty on the Functioning of the EU (TFEU) and Article 257 of EU Financial Regulation 2018/1046. If requested by these bodies, the beneficiary concerned must provide full, accurate and complete information in the format requested (including complete accounts, individual salary statements or other personal data, including in electronic format) and allow access to sites and premises for on-the-spot visits or inspections — as provided for under these Regulations. To this end, the beneficiary concerned must keep all relevant information relating to the action, at least until the time-limit set out in the Data Sheet (Point 6) and, in any case, until any ongoing checks, reviews, audits, investigations, litigation or other pursuits of claims have been concluded. 25.5 Consequences of checks, reviews, audits and investigations — Extension of results of reviews, audits or investigations 25.5.1 Consequences of checks, reviews, audits and investigations in this grant Findings in checks, reviews, audits or investigations carried out in the context of this grant may lead to rejections (see Article 27), grant reduction (see Article 28) or other measures described in Chapter 5. Rejections or grant reductions after the final payment will lead to a revised final grant amount (see Article 22). Findings in checks, reviews, audits or investigations during the action implementation may lead to a request for amendment (see Article 39), to change the description of the action set out in Annex 1. Checks, reviews, audits or investigations that find systemic or recurrent errors, irregularities, fraud or breach of obligations in any EU grant may also lead to consequences in other EU grants awarded under similar conditions (‘extension to other grants’). Moreover, findings arising from an OLAF or EPPO investigation may lead to criminal prosecution under national law. 25.5.2 Extension from other grants Results of checks, reviews, audits or investigations in other grants may be extended to this grant, if: (a) the beneficiary concerned is found, in other EU grants awarded under similar conditions, to have committed systemic or recurrent errors, irregularities, fraud or breach of obligations that have a material impact on this grant and (b) those findings are formally notified to the beneficiary concerned — together with the list of grants affected by the findings — within the time-limit for audits set out in the Data Sheet (see Point 6). The granting authority will formally notify the beneficiary concerned of the intention to extend the findings and the list of grants affected. If the extension concerns rejections of costs or contributions: the notification will include: (a) an invitation to submit observations on the list of grants affected by the findings (b) the request to submit revised financial statements for all grants affected 57 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 (c) the correction rate for extrapolation, established on the basis of the systemic or recurrent errors, to calculate the amounts to be rejected, if the beneficiary concerned: (i) considers that the submission of revised financial statements is not possible or practicable or (ii) does not submit revised financial statements. If the extension concerns grant reductions: the notification will include: (a) an invitation to submit observations on the list of grants affected by the findings and (b) the correction rate for extrapolation, established on the basis of the systemic or recurrent errors and the principle of proportionality. The beneficiary concerned has 60 days from receiving notification to submit observations, revised financial statements or to propose a duly substantiated alternative correction method/rate. On the basis of this, the granting authority will analyse the impact and decide on the implementation (i.e. start rejection or grant reduction procedures, either on the basis of the revised financial statements or the announced/alternative method/rate or a mix of those; see Articles 27 and 28). 25.6 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, costs or contributions insufficiently substantiated will be ineligible (see Article 6) and will be rejected (see Article 27), and the grant may be reduced (see Article 28). Such breaches may also lead to other measures described in Chapter 5. ARTICLE 26 — IMPACT EVALUATIONS 26.1 Impact evaluation The granting authority may carry out impact evaluations of the action, measured against the objectives and indicators of the EU programme funding the grant. Such evaluations may be started during implementation of the action and until the time-limit set out in the Data Sheet (see Point 6). They will be formally notified to the coordinator or beneficiaries and will be considered to start on the date of the notification. If needed, the granting authority may be assisted by independent outside experts. The coordinator or beneficiaries must provide any information relevant to evaluate the impact of the action, including information in electronic format. 26.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the granting authority may apply the measures described in Chapter 5. 58 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 CHAPTER 5 CONSEQUENCES OF NON-COMPLIANCE SECTION 1 REJECTIONS AND GRANT REDUCTION ARTICLE 27 — REJECTION OF COSTS AND CONTRIBUTIONS 27.1 Conditions The granting authority will — at beneficiary termination, interim payment, final payment or afterwards — reject any costs or contributions which are ineligible (see Article 6), in particular following checks, reviews, audits or investigations (see Article 25). The rejection may also be based on the extension of findings from other grants to this grant (see Article 25). Ineligible costs or contributions will be rejected. 27.2 Procedure If the rejection does not lead to a recovery, the granting authority will formally notify the coordinator or beneficiary concerned of the rejection, the amounts and the reasons why. The coordinator or beneficiary concerned may — within 30 days of receiving notification — submit observations if it disagrees with the rejection (payment review procedure). If the rejection leads to a recovery, the granting authority will follow the contradictory procedure with pre-information letter set out in Article 22. 27.3 Effects If the granting authority rejects costs or contributions, it will deduct them from the costs or contributions declared and then calculate the amount due (and, if needed, make a recovery; see Article 22). ARTICLE 28 — GRANT REDUCTION 28.1 Conditions The granting authority may — at beneficiary termination, final payment or afterwards — reduce the grant for a beneficiary, if: (a) the beneficiary (or a person having powers of representation, decision-making or control, or person essential for the award/implementation of the grant) has committed: (i) substantial errors, irregularities or fraud or (ii) serious breach of obligations under this Agreement or during its award (including improper implementation of the action, non-compliance with the call conditions, submission of false information, failure to provide required information, breach of ethics or security rules (if applicable), etc.), or (b) the beneficiary (or a person having powers of representation, decision-making or control, or 59 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 person essential for the award/implementation of the grant) has committed — in other EU grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (see Article 25). The amount of the reduction will be calculated for each beneficiary concerned and proportionate to the seriousness and the duration of the errors, irregularities or fraud or breach of obligations, by applying an individual reduction rate to their accepted EU contribution. 28.2 Procedure If the grant reduction does not lead to a recovery, the granting authority will formally notify the coordinator or beneficiary concerned of the reduction, the amount to be reduced and the reasons why. The coordinator or beneficiary concerned may — within 30 days of receiving notification — submit observations if it disagrees with the reduction (payment review procedure). If the grant reduction leads to a recovery, the granting authority will follow the contradictory procedure with pre-information letter set out in Article 22. 28.3 Effects If the granting authority reduces the grant, it will deduct the reduction and then calculate the amount due (and, if needed, make a recovery; see Article 22). SECTION 2 SUSPENSION AND TERMINATION ARTICLE 29 — PAYMENT DEADLINE SUSPENSION 29.1 Conditions The granting authority may — at any moment — suspend the payment deadline if a payment cannot be processed because: (a) the required report (see Article 21) has not been submitted or is not complete or additional information is needed (b) there are doubts about the amount to be paid (e.g. ongoing audit extension procedure, queries about eligibility, need for a grant reduction, etc.) and additional checks, reviews, audits or investigations are necessary, or (c) there are other issues affecting the EU financial interests. 29.2 Procedure The granting authority will formally notify the coordinator of the suspension and the reasons why. The suspension will take effect the day the notification is sent. If the conditions for suspending the payment deadline are no longer met, the suspension will be lifted — and the remaining time to pay (see Data Sheet, Point 4.2) will resume. 60 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 If the suspension exceeds two months, the coordinator may request the granting authority to confirm if the suspension will continue. If the payment deadline has been suspended due to the non-compliance of the report and the revised report is not submitted (or was submitted but is also rejected), the granting authority may also terminate the grant or the participation of the coordinator (see Article 32). ARTICLE 30 — PAYMENT SUSPENSION 30.1 Conditions The granting authority may — at any moment — suspend payments, in whole or in part for one or more beneficiaries, if: (a) a beneficiary (or a person having powers of representation, decision-making or control, or person essential for the award/implementation of the grant) has committed or is suspected of having committed: (i) substantial errors, irregularities or fraud or (ii) serious breach of obligations under this Agreement or during its award (including improper implementation of the action, non-compliance with the call conditions, submission of false information, failure to provide required information, breach of ethics or security rules (if applicable), etc.), or (b) a beneficiary (or a person having powers of representation, decision-making or control, or person essential for the award/implementation of the grant) has committed — in other EU grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant. If payments are suspended for one or more beneficiaries, the granting authority will make partial payment(s) for the part(s) not suspended. If suspension concerns the final payment, the payment (or recovery) of the remaining amount after suspension is lifted will be considered to be the payment that closes the action. 30.2 Procedure Before suspending payments, the granting authority will send a pre-information letter to the beneficiary concerned: - formally notifying the intention to suspend payments and the reasons why and - requesting observations within 30 days of receiving notification. If the granting authority does not receive observations or decides to pursue the procedure despite the observations it has received, it will confirm the suspension (confirmation letter). Otherwise, it will formally notify that the procedure is discontinued. At the end of the suspension procedure, the granting authority will also inform the coordinator. The suspension will take effect the day after the confirmation notification is sent. 61 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 If the conditions for resuming payments are met, the suspension will be lifted. The granting authority will formally notify the beneficiary concerned (and the coordinator) and set the suspension end date. During the suspension, no prefinancing will be paid to the beneficiaries concerned. For interim payments, the periodic reports for all reporting periods except the last one (see Article 21) must not contain any financial statements from the beneficiary concerned (or its affiliated entities). The coordinator must include them in the next periodic report after the suspension is lifted or — if suspension is not lifted before the end of the action — in the last periodic report. ARTICLE 31 — GRANT AGREEMENT SUSPENSION 31.1 Consortium-requested GA suspension 31.1.1 Conditions and procedure The beneficiaries may request the suspension of the grant or any part of it, if exceptional circumstances — in particular force majeure (see Article 35) — make implementation impossible or excessively difficult. The coordinator must submit a request for amendment (see Article 39), with: - the reasons why - the date the suspension takes effect; this date may be before the date of the submission of the amendment request and - the expected date of resumption. The suspension will take effect on the day specified in the amendment. Once circumstances allow for implementation to resume, the coordinator must immediately request another amendment of the Agreement to set the suspension end date, the resumption date (one day after suspension end date), extend the duration and make other changes necessary to adapt the action to the new situation (see Article 39) — unless the grant has been terminated (see Article 32). The suspension will be lifted with effect from the suspension end date set out in the amendment. This date may be before the date of the submission of the amendment request. During the suspension, no prefinancing will be paid. Costs incurred or contributions for activities implemented during grant suspension are not eligible (see Article 6.3). 31.2 EU-initiated GA suspension 31.2.1 Conditions The granting authority may suspend the grant or any part of it, if: (a) a beneficiary (or a person having powers of representation, decision-making or control, or person essential for the award/implementation of the grant) has committed or is suspected of having committed: (i) substantial errors, irregularities or fraud or 62 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 (ii) serious breach of obligations under this Agreement or during its award (including improper implementation of the action, non-compliance with the call conditions, submission of false information, failure to provide required information, breach of ethics or security rules (if applicable), etc.), or (b) a beneficiary (or a person having powers of representation, decision-making or control, or person essential for the award/implementation of the grant) has committed — in other EU grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (c) other: (i) linked action issues: not applicable (ii) additional GA suspension grounds: not applicable. 31.2.2 Procedure Before suspending the grant, the granting authority will send a pre-information letter to the coordinator: - formally notifying the intention to suspend the grant and the reasons why and - requesting observations within 30 days of receiving notification. If the granting authority does not receive observations or decides to pursue the procedure despite the observations it has received, it will confirm the suspension (confirmation letter). Otherwise, it will formally notify that the procedure is discontinued. The suspension will take effect the day after the confirmation notification is sent (or on a later date specified in the notification). Once the conditions for resuming implementation of the action are met, the granting authority will formally notify the coordinator a lifting of suspension letter, in which it will set the suspension end date and invite the coordinator to request an amendment of the Agreement to set the resumption date (one day after suspension end date), extend the duration and make other changes necessary to adapt the action to the new situation (see Article 39) — unless the grant has been terminated (see Article 32). The suspension will be lifted with effect from the suspension end date set out in the lifting of suspension letter. This date may be before the date on which the letter is sent. During the suspension, no prefinancing will be paid. Costs incurred or contributions for activities implemented during suspension are not eligible (see Article 6.3). The beneficiaries may not claim damages due to suspension by the granting authority (see Article 33). Grant suspension does not affect the granting authority’s right to terminate the grant or a beneficiary (see Article 32) or reduce the grant (see Article 28). ARTICLE 32 — GRANT AGREEMENT OR BENEFICIARY TERMINATION 32.1 Consortium-requested GA termination 63 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 32.1.1 Conditions and procedure The beneficiaries may request the termination of the grant. The coordinator must submit a request for amendment (see Article 39), with: - the reasons why - the date the consortium ends work on the action (‘end of work date’) and - the date the termination takes effect (‘termination date’); this date must be after the date of the submission of the amendment request. The termination will take effect on the termination date specified in the amendment. If no reasons are given or if the granting authority considers the reasons do not justify termination, it may consider the grant terminated improperly. 32.1.2 Effects The coordinator must — within 60 days from when termination takes effect — submit a periodic report (for the open reporting period until termination). The granting authority will calculate the final grant amount and final payment on the basis of the report submitted and taking into account the costs incurred and contributions for activities implemented before the end of work date (see Article 22). Costs relating to contracts due for execution only after the end of work are not eligible. If the granting authority does not receive the report within the deadline, only costs and contributions which are included in an approved periodic report will be taken into account (no costs/contributions if no periodic report was ever approved). Improper termination may lead to a grant reduction (see Article 28). After termination, the beneficiaries’ obligations (in particular Articles 13 (confidentiality and security), 16 (IPR), 17 (communication, dissemination and visibility), 21 (reporting), 25 (checks, reviews, audits and investigations), 26 (impact evaluation), 27 (rejections), 28 (grant reduction) and 42 (assignment of claims)) continue to apply. 32.2 Consortium-requested beneficiary termination 32.2.1 Conditions and procedure The coordinator may request the termination of the participation of one or more beneficiaries, on request of the beneficiary concerned or on behalf of the other beneficiaries. The coordinator must submit a request for amendment (see Article 39), with: - the reasons why - the opinion of the beneficiary concerned (or proof that this opinion has been requested in writing) 64 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 - the date the beneficiary ends work on the action (‘end of work date’) - the date the termination takes effect (‘termination date’); this date must be after the date of the submission of the amendment request. If the termination concerns the coordinator and is done without its agreement, the amendment request must be submitted by another beneficiary (acting on behalf of the consortium). The termination will take effect on the termination date specified in the amendment. If no information is given or if the granting authority considers that the reasons do not justify termination, it may consider the beneficiary to have been terminated improperly. 32.2.2 Effects The coordinator must — within 60 days from when termination takes effect — submit: (i) a report on the distribution of payments to the beneficiary concerned (ii) a termination report from the beneficiary concerned, for the open reporting period until termination, containing an overview of the progress of the work, the financial statement, the explanation on the use of resources, and, if applicable, the certificate on the financial statement (CFS; see Articles 21 and 24.2 and Data Sheet, Point 4.3) (iii) a second request for amendment (see Article 39) with other amendments needed (e.g. reallocation of the tasks and the estimated budget of the terminated beneficiary; addition of a new beneficiary to replace the terminated beneficiary; change of coordinator, etc.). The granting authority will calculate the amount due to the beneficiary on the basis of the report submitted and taking into account the costs incurred and contributions for activities implemented before the end of work date (see Article 22). Costs relating to contracts due for execution only after the end of work are not eligible. The information in the termination report must also be included in the periodic report for the next reporting period (see Article 21). If the granting authority does not receive the termination report within the deadline, only costs and contributions which are included in an approved periodic report will be taken into account (no costs/ contributions if no periodic report was ever approved). If the granting authority does not receive the report on the distribution of payments within the deadline, it will consider that: - the coordinator did not distribute any payment to the beneficiary concerned and that - the beneficiary concerned must not repay any amount to the coordinator. If the second request for amendment is accepted by the granting authority, the Agreement is amended to introduce the necessary changes (see Article 39). If the second request for amendment is rejected by the granting authority (because it calls into question the decision awarding the grant or breaches the principle of equal treatment of applicants), the grant may be terminated (see Article 32). 65 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Improper termination may lead to a reduction of the grant (see Article 31) or grant termination (see Article 32). After termination, the concerned beneficiary’s obligations (in particular Articles 13 (confidentiality and security), 16 (IPR), 17 (communication, dissemination and visibility), 21 (reporting), 25 (checks, reviews, audits and investigations), 26 (impact evaluation), 27 (rejections), 28 (grant reduction) and 42 (assignment of claims)) continue to apply. 32.3 EU-initiated GA or beneficiary termination 32.3.1 Conditions The granting authority may terminate the grant or the participation of one or more beneficiaries, if: (a) one or more beneficiaries do not accede to the Agreement (see Article 40) (b) a change to the action or the legal, financial, technical, organisational or ownership situation of a beneficiary is likely to substantially affect the implementation of the action or calls into question the decision to award the grant (including changes linked to one of the exclusion grounds listed in the declaration of honour) (c) following termination of one or more beneficiaries, the necessary changes to the Agreement (and their impact on the action) would call into question the decision awarding the grant or breach the principle of equal treatment of applicants (d) implementation of the action has become impossible or the changes necessary for its continuation would call into question the decision awarding the grant or breach the principle of equal treatment of applicants (e) a beneficiary (or person with unlimited liability for its debts) is subject to bankruptcy proceedings or similar (including insolvency, winding-up, administration by a liquidator or court, arrangement with creditors, suspension of business activities, etc.) (f) a beneficiary (or person with unlimited liability for its debts) is in breach of social security or tax obligations (g) a beneficiary (or person having powers of representation, decision-making or control, or person essential for the award/implementation of the grant) has been found guilty of grave professional misconduct (h) a beneficiary (or person having powers of representation, decision-making or control, or person essential for the award/implementation of the grant) has committed fraud, corruption, or is involved in a criminal organisation, money laundering, terrorism-related crimes (including terrorism financing), child labour or human trafficking (i) a beneficiary (or person having powers of representation, decision-making or control, or person essential for the award/implementation of the grant) was created under a different jurisdiction with the intent to circumvent fiscal, social or other legal obligations in the country of origin (or created another entity with this purpose) (j) a beneficiary (or person having powers of representation, decision-making or control, or person essential for the award/implementation of the grant) has committed: 66 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 (i) substantial errors, irregularities or fraud or (ii) serious breach of obligations under this Agreement or during its award (including improper implementation of the action, non-compliance with the call conditions, submission of false information, failure to provide required information, breach of ethics or security rules (if applicable), etc.) (k) a beneficiary (or person having powers of representation, decision-making or control, or person essential for the award/implementation of the grant) has committed — in other EU grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (extension of findings from other grants to this grant; see Article 25) (l) despite a specific request by the granting authority, a beneficiary does not request — through the coordinator — an amendment to the Agreement to end the participation of one of its affiliated entities or associated partners that is in one of the situations under points (d), (f), (e), (g), (h), (i) or (j) and to reallocate its tasks, or (m) other: (i) linked action issues: not applicable (ii) additional GA termination grounds: not applicable. 32.3.2 Procedure Before terminating the grant or participation of one or more beneficiaries, the granting authority will send a pre-information letter to the coordinator or beneficiary concerned: - formally notifying the intention to terminate and the reasons why and - requesting observations within 30 days of receiving notification. If the granting authority does not receive observations or decides to pursue the procedure despite the observations it has received, it will confirm the termination and the date it will take effect (confirmation letter). Otherwise, it will formally notify that the procedure is discontinued. For beneficiary terminations, the granting authority will — at the end of the procedure — also inform the coordinator. The termination will take effect the day after the confirmation notification is sent (or on a later date specified in the notification; ‘termination date’). 32.3.3 Effects (a) for GA termination: The coordinator must — within 60 days from when termination takes effect — submit a periodic report (for the last open reporting period until termination). The granting authority will calculate the final grant amount and final payment on the basis of the report submitted and taking into account the costs incurred and contributions for activities 67 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 implemented before termination takes effect (see Article 22). Costs relating to contracts due for execution only after termination are not eligible. If the grant is terminated for breach of the obligation to submit reports, the coordinator may not submit any report after termination. If the granting authority does not receive the report within the deadline, only costs and contributions which are included in an approved periodic report will be taken into account (no costs/contributions if no periodic report was ever approved). Termination does not affect the granting authority’s right to reduce the grant (see Article 28) or to impose administrative sanctions (see Article 34). The beneficiaries may not claim damages due to termination by the granting authority (see Article 33). After termination, the beneficiaries’ obligations (in particular Articles 13 (confidentiality and security), 16 (IPR), 17 (communication, dissemination and visibility), 21 (reporting), 25 (checks, reviews, audits and investigations), 26 (impact evaluation), 27 (rejections), 28 (grant reduction) and 42 (assignment of claims)) continue to apply. (b) for beneficiary termination: The coordinator must — within 60 days from when termination takes effect — submit: (i) a report on the distribution of payments to the beneficiary concerned (ii) a termination report from the beneficiary concerned, for the open reporting period until termination, containing an overview of the progress of the work, the financial statement, the explanation on the use of resources, and, if applicable, the certificate on the financial statement (CFS; see Articles 21 and 24.2 and Data Sheet, Point 4.3) (iii) a request for amendment (see Article 39) with any amendments needed (e.g. reallocation of the tasks and the estimated budget of the terminated beneficiary; addition of a new beneficiary to replace the terminated beneficiary; change of coordinator, etc.). The granting authority will calculate the amount due to the beneficiary on the basis of the report submitted and taking into account the costs incurred and contributions for activities implemented before termination takes effect (see Article 22). Costs relating to contracts due for execution only after termination are not eligible. The information in the termination report must also be included in the periodic report for the next reporting period (see Article 21). If the granting authority does not receive the termination report within the deadline, only costs and contributions included in an approved periodic report will be taken into account (no costs/ contributions if no periodic report was ever approved). If the granting authority does not receive the report on the distribution of payments within the deadline, it will consider that: 68 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 - the coordinator did not distribute any payment to the beneficiary concerned and that - the beneficiary concerned must not repay any amount to the coordinator. If the request for amendment is accepted by the granting authority, the Agreement is amended to introduce the necessary changes (see Article 39). If the request for amendment is rejected by the granting authority (because it calls into question the decision awarding the grant or breaches the principle of equal treatment of applicants), the grant may be terminated (see Article 32). After termination, the concerned beneficiary’s obligations (in particular Articles 13 (confidentiality and security), 16 (IPR), 17 (communication, dissemination and visibility), 21 (reporting), 25 (checks, reviews, audits and investigations), 26 (impact evaluation), 27 (rejections), 28 (grant reduction) and 42 (assignment of claims)) continue to apply. SECTION 3 OTHER CONSEQUENCES: DAMAGES AND ADMINISTRATIVE SANCTIONS ARTICLE 33 — DAMAGES 33.1 Liability of the granting authority The granting authority cannot be held liable for any damage caused to the beneficiaries or to third parties as a consequence of the implementation of the Agreement, including for gross negligence. The granting authority cannot be held liable for any damage caused by any of the beneficiaries or other participants involved in the action, as a consequence of the implementation of the Agreement. 33.2 Liability of the beneficiaries The beneficiaries must compensate the granting authority for any damage it sustains as a result of the implementation of the action or because the action was not implemented in full compliance with the Agreement, provided that it was caused by gross negligence or wilful act. The liability does not extend to indirect or consequential losses or similar damage (such as loss of profit, loss of revenue or loss of contracts), provided such damage was not caused by wilful act or by a breach of confidentiality. ARTICLE 34 — ADMINISTRATIVE SANCTIONS AND OTHER MEASURES Nothing in this Agreement may be construed as preventing the adoption of administrative sanctions (i.e. exclusion from EU award procedures and/or financial penalties) or other public law measures, in addition or as an alternative to the contractual measures provided under this Agreement (see, for instance, Articles 135 to 145 EU Financial Regulation 2018/1046 and Articles 4 and 7 of Regulation 2988/9524). 24 Council Regulation (EC, Euratom) No 2988/95 of 18 December 1995 on the protection of the European Communities financial interests (OJ L 312, 23.12.1995, p. 1). 69 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 SECTION 4 FORCE MAJEURE ARTICLE 35 — FORCE MAJEURE A party prevented by force majeure from fulfilling its obligations under the Agreement cannot be considered in breach of them. ‘Force majeure’ means any situation or event that: - prevents either party from fulfilling their obligations under the Agreement, - was unforeseeable, exceptional situation and beyond the parties’ control, - was not due to error or negligence on their part (or on the part of other participants involved in the action), and - proves to be inevitable in spite of exercising all due diligence. Any situation constituting force majeure must be formally notified to the other party without delay, stating the nature, likely duration and foreseeable effects. The parties must immediately take all the necessary steps to limit any damage due to force majeure and do their best to resume implementation of the action as soon as possible. CHAPTER 6 FINAL PROVISIONS ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES 36.1 Forms and means of communication — Electronic management EU grants are managed fully electronically through the EU Funding & Tenders Portal (‘Portal’). All communications must be made electronically through the Portal, in accordance with the Portal Terms and Conditions and using the forms and templates provided there (except if explicitly instructed otherwise by the granting authority). Communications must be made in writing and clearly identify the grant agreement (project number and acronym). Communications must be made by persons authorised according to the Portal Terms and Conditions. For naming the authorised persons, each beneficiary must have designated — before the signature of this Agreement — a ‘legal entity appointed representative (LEAR)’. The role and tasks of the LEAR are stipulated in their appointment letter (see Portal Terms and Conditions). If the electronic exchange system is temporarily unavailable, instructions will be given on the Portal. 36.2 Date of communication The sending date for communications made through the Portal will be the date and time of sending, as indicated by the time logs. 70 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 The receiving date for communications made through the Portal will be the date and time the communication is accessed, as indicated by the time logs. Formal notifications that have not been accessed within 10 days after sending, will be considered to have been accessed (see Portal Terms and Conditions). If a communication is exceptionally made on paper (by e-mail or postal service), general principles apply (i.e. date of sending/receipt). Formal notifications by registered post with proof of delivery will be considered to have been received either on the delivery date registered by the postal service or the deadline for collection at the post office. If the electronic exchange system is temporarily unavailable, the sending party cannot be considered in breach of its obligation to send a communication within a specified deadline. 36.3 Addresses for communication The Portal can be accessed via the Europa website. The address for paper communications to the granting authority (if exceptionally allowed) is the official mailing address indicated on its website. For beneficiaries, it is the legal address specified in the Portal Participant Register. ARTICLE 37 — INTERPRETATION OF THE AGREEMENT The provisions in the Data Sheet take precedence over the rest of the Terms and Conditions of the Agreement. Annex 5 takes precedence over the Terms and Conditions; the Terms and Conditions take precedence over the Annexes other than Annex 5. Annex 2 takes precedence over Annex 1. ARTICLE 38 — CALCULATION OF PERIODS AND DEADLINES In accordance with Regulation No 1182/7125, periods expressed in days, months or years are calculated from the moment the triggering event occurs. The day during which that event occurs is not considered as falling within the period. ‘Days’ means calendar days, not working days. ARTICLE 39 — AMENDMENTS 39.1 Conditions The Agreement may be amended, unless the amendment entails changes to the Agreement which would call into question the decision awarding the grant or breach the principle of equal treatment of applicants. 25 Regulation (EEC, Euratom) No 1182/71 of the Council of 3 June 1971 determining the rules applicable to periods, dates and time-limits (OJ L 124, 8/6/1971, p. 1). 71 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 Amendments may be requested by any of the parties. 39.2 Procedure The party requesting an amendment must submit a request for amendment signed directly in the Portal Amendment tool. The coordinator submits and receives requests for amendment on behalf of the beneficiaries (see Annex 3). If a change of coordinator is requested without its agreement, the submission must be done by another beneficiary (acting on behalf of the other beneficiaries). The request for amendment must include: - the reasons why - the appropriate supporting documents and - for a change of coordinator without its agreement: the opinion of the coordinator (or proof that this opinion has been requested in writing). The granting authority may request additional information. If the party receiving the request agrees, it must sign the amendment in the tool within 45 days of receiving notification (or any additional information the granting authority has requested). If it does not agree, it must formally notify its disagreement within the same deadline. The deadline may be extended, if necessary for the assessment of the request. If no notification is received within the deadline, the request is considered to have been rejected. An amendment enters into force on the day of the signature of the receiving party. An amendment takes effect on the date of entry into force or other date specified in the amendment. ARTICLE 40 — ACCESSION AND ADDITION OF NEW BENEFICIARIES 40.1 Accession of the beneficiaries mentioned in the Preamble The beneficiaries which are not coordinator must accede to the grant by signing the accession form (see Annex 3) directly in the Portal Grant Preparation tool, within 30 days after the entry into force of the Agreement (see Article 44). They will assume the rights and obligations under the Agreement with effect from the date of its entry into force (see Article 44). If a beneficiary does not accede to the grant within the above deadline, the coordinator must — within 30 days — request an amendment (see Article 39) to terminate the beneficiary and make any changes necessary to ensure proper implementation of the action. This does not affect the granting authority’s right to terminate the grant (see Article 32). 40.2 Addition of new beneficiaries In justified cases, the beneficiaries may request the addition of a new beneficiary. 72 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 For this purpose, the coordinator must submit a request for amendment in accordance with Article 39. It must include an accession form (see Annex 3) signed by the new beneficiary directly in the Portal Amendment tool. New beneficiaries will assume the rights and obligations under the Agreement with effect from the date of their accession specified in the accession form (see Annex 3). Additions are also possible in mono-beneficiary grants. ARTICLE 41 — TRANSFER OF THE AGREEMENT In justified cases, the beneficiary of a mono-beneficiary grant may request the transfer of the grant to a new beneficiary, provided that this would not call into question the decision awarding the grant or breach the principle of equal treatment of applicants. The beneficiary must submit a request for amendment (see Article 39), with - the reasons why - the accession form (see Annex 3) signed by the new beneficiary directly in the Portal Amendment tool and - additional supporting documents (if required by the granting authority). The new beneficiary will assume the rights and obligations under the Agreement with effect from the date of accession specified in the accession form (see Annex 3). ARTICLE 42 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE GRANTING AUTHORITY The beneficiaries may not assign any of their claims for payment against the granting authority to any third party, except if expressly approved in writing by the granting authority on the basis of a reasoned, written request by the coordinator (on behalf of the beneficiary concerned). If the granting authority has not accepted the assignment or if the terms of it are not observed, the assignment will have no effect on it. In no circumstances will an assignment release the beneficiaries from their obligations towards the granting authority. ARTICLE 43 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES 43.1 Applicable law The Agreement is governed by the applicable EU law, supplemented if necessary by the law of Belgium. Special rules may apply for beneficiaries which are international organisations (if any; see Data Sheet, Point 5). 43.2 Dispute settlement 73 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA EU4H Ref. Associated with document MGAAres(2023)8598037 — Multi & Mono:-v1.1 14/12/2023 If a dispute concerns the interpretation, application or validity of the Agreement, the parties must bring action before the EU General Court — or, on appeal, the EU Court of Justice — under Article 272 of the Treaty on the Functioning of the EU (TFEU). For non-EU beneficiaries (if any), such disputes must be brought before the courts of Brussels, Belgium — unless an international agreement provides for the enforceability of EU court judgements. For beneficiaries with arbitration as special dispute settlement forum (if any; see Data Sheet, Point 5), the dispute will — in the absence of an amicable settlement — be settled in accordance with the Rules for Arbitration published on the Portal. If a dispute concerns administrative sanctions, offsetting or an enforceable decision under Article 299 TFEU (see Articles 22 and 34), the beneficiaries must bring action before the General Court — or, on appeal, the Court of Justice — under Article 263 TFEU. For grants where the granting authority is an EU executive agency (see Preamble), actions against offsetting and enforceable decisions must be brought against the European Commission (not against the granting authority; see also Article 22). ARTICLE 44 — ENTRY INTO FORCE The Agreement will enter into force on the day of signature by the granting authority or the coordinator, depending on which is later. SIGNATURES For the coordinator For the granting authority [--TGSMark#signature-999937402_75_210--] [--TGSMark#signature-service_75_210--] Pikka Jokelainen with ECAS id n00232dh signed in the Participant Signed by Florina TELEA with ECAS id teleafa as an authorised Portal on 15/12/2023 at 22:12:41 (transaction id SigId-24187-PLuFIW representative on 18-12-2023 11:40:58 (transaction id SigId-34432-p GIhnBISZ4NN0YJbHepI8v6cV04IXVlkImWtXhfb9EcMmAdwiQY7KEUv mThJzb1daVPHiihPLFPT2tGcNzH0ztqBvoOhzLfNQc0XBKLeHOiMTZe WMuP7dwEBGhL4CZ9sg4ccORzK-rS0vSrmBGYCDizzXLry5ezy-GJ8GC 8rLDCnLCicCm5fze5VoPjh2HGwekqKe-rS0vSrmBGYCDizzXLry5ezy-K U71tvDIBaT79LMOHwzs60nogNj43Zk5DcPfTbwxzvmDDlzjFL4OgUD cV93hAkFzgp5Z5jVW3X2PQtdpofzmBPvk6SPJW6hOmzJs6bF0Wr0Az pcDwkq2Pd9yvLRh2ue7simp78fOm). Timestamp by third party at U42yAt4QCRzzgWTLJM6fb4BdW8fXvlAzS) 2023.12.15 22:12:47 CET 2023.12.18 11:41:03 CET 74 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 ANNEX 1 EU4Health Programme (EU4H) Description of the action (DoA) Part A Part B Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DESCRIPTION OF THE ACTION (PART A) COVER PAGE Part A of the Description of the Action (DoA) must be completed directly on the Portal Grant Preparation screens. PROJECT Grant Preparation (General Information screen) — Enter the info. Project number: 101140460 Project name: EU Wastewater Integrated Surveillance for Public Health Project acronym: EU-WISH Call: EU4H-2023-JA-IBA Topic: EU4H-2023-JA-IBA-02 Type of action: EU4H-PJG Service: HADEA/A/01 Project starting date: fixed date: 1 November 2023 Project duration: 36 months TABLE OF CONTENTS Project summary ......................................................................................................................................................3 List of participants .................................................................................................................................................. 3 List of work packages .............................................................................................................................................7 Staff effort ............................................................................................................................................................. 12 List of deliverables ................................................................................................................................................15 List of milestones (outputs/outcomes) .................................................................................................................. 21 List of critical risks ............................................................................................................................................... 23 2 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 PROJECT SUMMARY Project summary Grant Preparation (General Information screen) — Provide an overall description of your project (including context and overall objectives, planned activities and main achievements, and expected results and impacts (on target groups, change procedures, capacities, innovation etc)). This summary should give readers a clear idea of what your project is about. Use the project summary from your proposal. The focus of this joint action, EU-WISH, is to support activities to enhance, extend and consolidate wastewater surveillance for public health. EU-WISH will improve national public health wastewater surveillance capacities by strengthening knowledge exchange and sharing best practices based on scientific evidence. The activities of this joint action will target and bring together relevant structures at national level and will facilitate the integration and complementarity of wastewater surveillance with other surveillance systems with a public health perspective to strengthen preparedness and response to cross border health threats. EU-WISH will help align epidemiological and technical methods for a range of targets for wastewater surveillance. EU-WISH supports the policy priority to strengthen the capability of the European Union for prevention of, preparedness for, and rapid response to, serious cross-border threats to health particularly through supporting data gathering, information exchange and surveillance. It implements the EU4Health Programme’s general objective of protecting people in the Union from serious cross-border threats to health and strengthening the responsiveness of health systems and coordination among the Member States to cope with serious cross-border threats to health. EU-WISH contributes to the achievement of the EU4Health Programme’s general objective of protecting people in the Union from serious cross- border threats to health and strengthening the responsiveness of health systems and coordination among the Member States. EU-WISH is a strong consortium that can contribute to a vision and activities for wastewater surveillance at not only European, but also global level. LIST OF PARTICIPANTS PARTICIPANTS Grant Preparation (Beneficiaries screen) — Enter the info. Number Role Short name Legal name Country PIC 1 COO SSI STATENS SERUM INSTITUT DK 999937402 2 BEN EODY ETHNIKOS ORGANISMOS DIMOSIAS YGEIAS EL 896563726 2.1 AE UTH PANEPISTIMIO THESSALIAS EL 986152150 2.2 AE AUTH ARISTOTELIO PANEPISTIMIO EL 999895692 THESSALONIKIS 2.3 AE NKUA ETHNIKO KAI KAPODISTRIAKO EL 999643007 PANEPISTIMIO ATHINON 2.4 AE UoC PANEPISTIMIO KRITIS EL 999588978 2.5 AE UOI PANEPISTIMIO IOANNINON EL 999852818 2.6 AE UPatras PANEPISTIMIO PATRON EL 999894528 3 BEN AGES AGES - OSTERREICHISCHE AT 998254743 AGENTUR FUR GESUNDHEIT UND ERNAHRUNGSSICHERHEIT GMBH 3.1 AE MUI MEDIZINISCHE UNIVERSITAT INNSBRUCK AT 999855437 3 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 PARTICIPANTS Grant Preparation (Beneficiaries screen) — Enter the info. Number Role Short name Legal name Country PIC 3.2 AE TU WIEN TECHNISCHE UNIVERSITAET WIEN AT 999979888 4 BEN Sciensano SCIENSANO BE 906160809 5 BEN CIPH HRVATSKI ZAVOD ZA JAVNO ZDRAVSTVO HR 998128255 6 BEN MPHS-CY Ministry of Health of the Republic of Cyprus CY 994267946 6.1 AE UCY UNIVERSITY OF CYPRUS CY 999835843 6.2 AE CING KYPRIAKO IDRYMA EREVNON GIA TI MYIKI CY 999642522 DISTROFIA 6.3 AE MoA-CY MINISTRY OF AGRICULTURE, RURAL CY 999434845 DEVELOPMENT AND ENVIRONMENT OF CYPRUS 7 BEN SZU STATNI ZDRAVOTNI USTAV CZ 999478689 7.1 AE UCT VYSOKA SKOLA CHEMICKO- CZ 999867853 TECHNOLOGICKA V PRAZE 8 BEN HB TERVISEAMET EE 933659727 9 BEN THL TERVEYDEN JA HYVINVOINNIN LAITOS FI 996697893 10 BEN DGS-FR MINISTERE DE LA SANTE ET DE LA FR 998887377 PREVENTION 10.1 AE SpFrance AGENCE NATIONALE DE SANTE PUBLIQUE FR 917843489 10.2 AE ANSES AGENCE NATIONALE DE LA SECURITE FR 983552356 SANITAIRE DE L ALIMENTATION DE L ENVIRONNEMENT ET DU TRAVAIL 11 BEN RKI ROBERT KOCH-INSTITUT DE 999515549 11.1 AE UBA UMWELTBUNDESAMT DE 998575910 12 BEN NNGYK NEMZETI NEPEGESZSEGUGYI ES HU 998706957 GYOGYSZERESZETI KOZPONT 13 BEN HSE HEALTH SERVICE EXECUTIVE HSE IE 993521919 13.1 AE UCD UNIVERSITY COLLEGE DUBLIN, NATIONAL IE 999974359 UNIVERSITY OF IRELAND, DUBLIN 13.2 AE UÉ IRISH WATER IE 936928918 14 BEN ISS ISTITUTO SUPERIORE DI SANITA IT 999978821 14.1 AE IT MOH MINISTERO DELLA SALUTE IT 999531942 14.2 AE FBK FONDAZIONE BRUNO KESSLER IT 999625450 14.3 AE RLDGW REGIONE LOMBARDIA IT 999654065 15 BEN CDPC SLIMIBU PROFILAKSES UN KONTROLES LV 952714019 CENTRS 15.1 AE BIOR PARTIKAS DROSIBAS, DZIVNIEKU LV 953459367 VESELIBAS UN VIDES ZINATNISKAIS INSTITUTSBIOR 4 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 PARTICIPANTS Grant Preparation (Beneficiaries screen) — Enter the info. Number Role Short name Legal name Country PIC 15.2 AE LBMC LATVIJAS BIOMEDICINAS PETIJUMU UN LV 998836646 STUDIJU CENTRS 16 BEN NVSC-LT NACIONALINIS VISUOMENES SVEIKATOS LT 918030796 CENTRAS PRIE SVEIKATOS APSAUGOS MINISTERIJOS 16.1 AE NVSPL-LT NACIONALINE VISUOMENES SVEIKATOS LT 933651094 PRIEZIUROS LABORATORIJA 17 BEN LIST LUXEMBOURG INSTITUTE OF SCIENCE AND LU 934320200 TECHNOLOGY 17.1 AE LNS LABORATOIRE NATIONAL DE SANTE LU 911247586 18 BEN IDCU Ministry for Health - Government of Malta MT 974144423 19 BEN RIVM RIJKSINSTITUUT VOOR VOLKSGEZONDHEID NL 999991431 EN MILIEU 20 BEN NIPH FOLKEHELSEINSTITUTTET NO 999478883 20.1 AE NVI VETERINAERINSTITUTTET NO 999511378 21 BEN INSA INSTITUTO NACIONAL DE SAUDE DR. PT 998308190 RICARDO JORGE 21.1 AE DGS MINISTERIO DA SAUDE - REPUBLICA PT 986364095 PORTUGUESA 21.2 AE AdP VALOR ADP VALOR - SERVIÇOS AMBIENTAIS, S.A. PT 984102346 22 BEN INSP INSTITUTUL NATIONAL DE SANATATE RO 985926237 PUBLICA 23 BEN NIJZ NACIONALNI INSTITUT ZA JAVNO ZDRAVJE SI 948891346 23.1 AE NLZOH NACIONALNI LABORATORIJ ZA ZDRAVJE, SI 949131227 OKOLJE IN HRANO 24 BEN ISCIII INSTITUTO DE SALUD CARLOS III ES 999507886 24.1 AE AEMPS AGENCIA ESPANOLA DE MEDICAMENTOS Y ES 999563952 PRODUCTOS SANITARIOS 24.2 AE UB UNIVERSITAT DE BARCELONA ES 999986387 24.3 AE USC UNIVERSIDAD DE SANTIAGO DE ES 999829635 COMPOSTELA 24.4 AE USAL UNIVERSIDAD DE SALAMANCA ES 999846610 25 BEN PHAS FOLKHALSOMYNDIGHETEN SE 949789954 25.1 AE SLU SVERIGES LANTBRUKSUNIVERSITET SE 999887350 26 BEN UPHC STATE INSTITUTION PUBLIC HEALTH UA 906650465 CENTER OF THE MINISTRY OF HEALTH OF UKRAINE 27 AP ANA ANA - AEROPORTOS DE PORTUGAL, SA PT 999943222 28 AP APA AGENCIA PORTUGUESA DO AMBIENTE IP PT 917950286 5 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 PARTICIPANTS Grant Preparation (Beneficiaries screen) — Enter the info. Number Role Short name Legal name Country PIC 29 AP CCAES MINISTERIO DE SANIDAD ES 905231452 6 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 LIST OF WORK PACKAGES Work packages Grant Preparation (Work Packages screen) — Enter the info. Work Work Package name Lead Beneficiary Effort Start End Deliverables Package No (Person- Month Month Months) WP1 Project management and coordination 1 - SSI 345.85 1 36 D1.1 – Data Management Plan D1.2 – EU-WISH: Key Advancements in Wastewater Surveillance in Europe WP2 Communication, Dissemination and Exploitation 17 - LIST 99.40 1 36 D2.1 – Dissemination and Communication plan D2.2 – Technical Guidance for Presenting and Sharing Wastewater Surveillance Data D2.3 – Dissemination Report WP3 Evaluation and Preparedness 2 - EODY 184.45 1 36 D3.1 – Evaluation Report D3.2 – Integration of Wastewater Surveillance in PHPP WP4 Sustainability and capacity building 20 - NIPH 236.85 1 36 D4.1 – EU-WISH Sustainability Report D4.2 – EU-WISH Capacity Building Report WP5 Mapping current actions and future priority targets 9 - THL 534.05 1 36 D5.1 – Wastewater Surveillance State of of wastewater surveillance the Art and Future Priorities in EU Member States WP6 Usage of wastewater surveillance data for public 1 - SSI 518.45 1 36 D6.1 – Technical recommendations for health wastewater surveillance and decision making WP7 Wastewater surveillance technical procedures, 19 - RIVM 840.13 1 36 D7.1 – Best practices regarding the sampling schemes and analysis methods for technical protocols used in wastewater priority targets surveillance 7 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Work package WP1 – Project management and coordination Work Package Number WP1 Lead Beneficiary 1 - SSI Work Package Name Project management and coordination Start Month 1 End Month 36 Objectives Objectives of WP1: To manage and coordinate the work To coordinate the compiling of the main deliverable document D1.2 ‘EU-WISH: Key advancements’ To establish and maintain contacts with stakeholders and maintain a matrix of collaborations and dependencies with other initiatives To draft and update Data Management Plan (DMP) of the project Description WP1 manages the project and is responsible for its progress and that the work adheres to legislation, rules and guidelines. WP1 coordinates the compiling of deliverables and reports and their timely submission and coordinates organisation of project meetings. WP1 works closely with all other WPs and aligns the work to the general objective and Specific Objectives. WP1 addresses Specific Objectives 4, 5 and 6 and supports addressing Specific Objectives 1,2 and 3. Work package WP2 – Communication, Dissemination and Exploitation Work Package Number WP2 Lead Beneficiary 17 - LIST Work Package Name Communication, Dissemination and Exploitation Start Month 1 End Month 36 Objectives Objectives of WP2: To map relevant stakeholders for dissemination, also outside Europe To develop the communication and dissemination plan that will set out the strategy of EU-WISH to maximize the impact of the project, to increase its visibility and to ensure that the project’s outputs will reach the widest audience possible. To organise and prepare the Dissemination Report To assist with dashboards and other IT-platforms for communication of wastewater-based surveillance results. Description WP2 manages the presentation and communication of results. This includes formats for the actual surveillance data that are generated but also scientific results that evolve from EU-WISH. Communication will be targeted at different groups, including scientific/expert audiences, health authorities, national and EU decision makers and the general public. Work package WP3 – Evaluation and Preparedness Work Package Number WP3 Lead Beneficiary 2 - EODY Work Package Name Evaluation and Preparedness Start Month 1 End Month 36 Objectives Objectives of WP3: 8 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 To evaluate the implementation against the workplan. To assess the achievement of the objectives and expected results and the attainment of the KPIs. To assess the effectiveness of wastewater surveillance for public health surveillance and preparedness for the different priority targets and objectives. To develop recommendations and model procedures for the integration of wastewater surveillance into public health preparedness plans with the active engagement of the relevant national, European and International competent authorities. To coordinate and prepare the Evaluation Report. Description WP3 evaluates the implementation and preliminary impact of EU-WISH and assesses the potential for integration of its outputs in public health preparedness plans. The task also aims at assessing the effectiveness of wastewater-based surveillance as a public health decision making tool. Work package WP4 – Sustainability and capacity building Work Package Number WP4 Lead Beneficiary 20 - NIPH Work Package Name Sustainability and capacity building Start Month 1 End Month 36 Objectives Objectives of WP4: Contribute to governance framework to secure the sustainability and financial viability of the wastewater surveillance at national and EU level. Strategy framework for capacity building and capacity building events. Deployment of online training resources to increase surveillance capacities at national and EU level for current and future human health threats. Coordinate and prepare Sustainability Report. Description WP4 aims to develop strategies and procedures for the sustainability of the action based on the development and implementation of 1) a governance framework and sustainability plan and 2) in-person and online training resources to ensure knowledge transfer through one-off investment with long-term benefits and the ability to reach a wide audience, especially those in developing countries. Work package WP5 – Mapping current actions and future priority targets of wastewater surveillance Work Package Number WP5 Lead Beneficiary 9 - THL Work Package Name Mapping current actions and future priority targets of wastewater surveillance Start Month 1 End Month 36 Objectives The objectives of WP5 are to: Conduct a system mapping to identify relevant wastewater surveillance actors and stakeholders and activity levels in each EU MS Co-create region-specific priority lists and groups of the wastewater surveillance targets with justifications Identify the specific surveillance targets for respiratory viruses, antimicrobial resistance (AMR), poliovirus and non- 9 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 poliovirus enteroviruses, emerging pathogens, chemical substances and other health-related biomarkers by scoping reviews Define in collaboration the objective(s) and surveillance schemes for these main groups of targets Describe, for each group of targets, the current implementation status for wastewater surveillance as a part of public health surveillance systems Description beginning of COVID-19 pandemic, an increasing interest and multiple important initiatives have been launched at the EU level and globally towards more comprehensive use of wastewater surveillance for public health action. WP5 will collect the main players in the field with existing experiences and use cases from each EU MS and assess the geographical differences and tentative gaps in current activity levels and priorities in wastewater surveillance targets at the European and global level. WP5 addresses Specific Objectives 1 and 2 and supports addressing Specific Objectives 4 and 5. Work package WP6 – Usage of wastewater surveillance data for public health Work Package Number WP6 Lead Beneficiary 1 - SSI Work Package Name Usage of wastewater surveillance data for public health Start Month 1 End Month 36 Objectives Objectives of WP6 are to develop: guidance for where to take samples, including of entry ports into the EU (such as airports and planes); state of the art recommendations for analysis of data depending on purpose and target; functional and usable analysis components for MS’s to use, containing real data and sample codes; indicators for and descriptions on how to integrate wastewater surveillance into other types of surveillance systems. Description WP 6 focuses on the non-laboratory components of wastewater surveillance; the topics that concern epidemiology and surveillance. WP6 aims to describe and develop knowledge that is theoretically well consolidated but can also be used for practical purposes so that it can support the development of broadly applied wastewater surveillance in Europe, and be applicable in settings where wastewater surveillance is not as yet well established, including in low- and middle- income countries. WP6 will consolidate and develop analysis tools along the directions that MS’s will decide to take, for the different targets. Work package WP7 – Wastewater surveillance technical procedures, sampling schemes and analysis methods for priority targets Work Package Number WP7 Lead Beneficiary 19 - RIVM Work Package Name Wastewater surveillance technical procedures, sampling schemes and analysis methods for priority targets Start Month 1 End Month 36 Objectives Objectives of WP7 are to: assess and evaluate the current technical procedures regarding sampling, transportation and biobanking procedures. assess and evaluate the current technical laboratory procedures of the detection (quantification) of priority targets. assess and evaluate the current technical procedures regarding advanced sequencing techniques and sequence data analysis. Generate and disseminate best practices for each of the above objectives to the MSs. 10 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Organize interlaboratory ring trials as well as on-site training events. Description Wastewater surveillance has great protentional to provide additional information on the circulation of public health threats to aid public health decision making. To strengthen the applicability of wastewater surveillance across the MSs, and ultimately globally, it is important to identify best practices with regard to technical protocols used; and disseminate these clearly defined protocols among the MSs and beyond, so that for example low- and middle-income countries can also benefit from the work done These best practice protocols will cover the most important technical (laboratory) protocols used, and might be used by MSs to help to set up, strengthen or expand wastewater surveillance for various priority targets. WP7 will focus on the technical laboratory procedures related to and used in wastewater surveillance, including for instance, sampling/transport/biobanking, purification and analytical methods for priority targets as well as Next Generation Sequencing (NGS) and Whole Genome Sequencing (WGS) techniques. Interlaboratory ring-trials and on-site training events will be organized. for interested MSs, especially those with less or no experience, to teach them how to work with the defined best practice protocols. 11 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 STAFF EFFORT Staff effort per participant Grant Preparation (Work packages - Effort screen) — Enter the info. Participant WP1 WP2 WP3 WP4 WP5 WP6 WP7 Total Person-Months 1 - SSI 79.00 2.00 3.00 5.00 5.00 52.00 49.00 195.00 2 - EODY 85.00 14.50 83.00 4.00 12.00 23.00 8.00 229.50 2.1 - UTH 1.00 0.50 4.00 1.00 12.00 5.00 23.50 2.2 - AUTH 1.00 0.50 1.00 1.00 22.00 9.00 15.00 49.50 2.3 - NKUA 1.00 0.50 1.00 1.00 10.00 2.00 18.00 33.50 2.4 - UoC 1.00 0.50 1.00 9.00 7.00 10.00 28.50 2.5 - UOI 1.00 0.50 7.00 4.00 2.00 4.00 18.50 2.6 - UPatras 1.00 0.50 1.00 1.00 5.00 5.00 4.00 17.50 3 - AGES 1.00 6.00 2.00 2.00 2.00 39.00 2.00 54.00 3.1 - MUI 3.00 3.00 6.00 3.2 - TU WIEN 0.40 0.30 0.40 0.40 0.20 0.20 3.30 5.20 4 - Sciensano 2.00 2.50 2.50 4.00 12.00 5.00 34.00 62.00 5 - CIPH 1.00 0.50 1.00 1.00 15.00 11.00 52.00 81.50 6 - MPHS-CY 1.00 0.50 1.00 1.00 4.00 4.00 4.00 15.50 6.1 - UCY 1.00 1.00 1.00 1.00 10.50 19.00 11.00 44.50 6.2 - CING 1.00 0.50 1.00 0.90 5.70 9.90 19.00 6.3 - MoA-CY 0.40 0.40 1.00 1.00 2.80 7 - SZU 6.00 3.50 4.00 4.00 5.00 10.00 15.00 47.50 7.1 - UCT 3.00 1.00 1.00 1.00 9.00 9.00 21.50 45.50 12 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Staff effort per participant Grant Preparation (Work packages - Effort screen) — Enter the info. Participant WP1 WP2 WP3 WP4 WP5 WP6 WP7 Total Person-Months 8 - HB 1.00 0.50 1.00 2.00 10.00 4.00 14.00 32.50 9 - THL 1.00 3.50 3.00 6.50 40.00 16.00 38.00 108.00 10 - DGS-FR 14.00 14.00 10.1 - SpFrance 1.00 0.50 1.00 1.00 12.00 48.00 5.00 68.50 10.2 - ANSES 1.15 0.50 1.00 1.00 6.90 7.70 42.55 60.80 11 - RKI 1.00 0.50 12.00 2.00 14.00 16.00 14.00 59.50 11.1 - UBA 14.00 14.00 12 - NNGYK 3.00 2.50 1.00 22.00 21.00 15.00 34.00 98.50 13 - HSE 1.00 1.00 2.00 2.00 2.00 4.00 1.00 13.00 13.1 - UCD 4.00 0.50 1.00 4.00 6.00 3.00 6.00 24.50 13.2 - UÉ 1.00 0.50 0.50 1.00 1.50 4.50 14 - ISS 1.00 0.50 1.00 1.00 5.50 5.50 24.50 39.00 14.1 - IT MOH 0.50 0.25 0.50 0.50 1.75 14.2 - FBK 1.00 3.00 10.00 14.00 14.3 - RLDGW 4.00 2.00 3.00 3.00 12.00 15 - CDPC 4.00 1.50 2.00 3.00 6.50 7.40 24.40 15.1 - BIOR 3.50 1.50 2.00 3.00 8.00 5.00 6.00 29.00 15.2 - LBMC 3.50 1.50 2.00 3.00 4.50 3.50 7.50 25.50 16 - NVSC-LT 2.00 4.50 6.00 6.00 5.00 13.00 0.50 37.00 16.1 - NVSPL-LT 1.00 0.50 1.00 1.00 4.00 12.00 19.50 17 - LIST 1.00 19.00 1.00 10.00 5.00 3.00 9.00 48.00 13 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Staff effort per participant Grant Preparation (Work packages - Effort screen) — Enter the info. Participant WP1 WP2 WP3 WP4 WP5 WP6 WP7 Total Person-Months 17.1 - LNS 0.50 0.50 0.50 0.50 0.50 12.50 15.00 18 - IDCU 5.00 1.00 2.00 3.00 17.00 17.00 45.00 19 - RIVM 2.00 2.00 2.00 20.00 31.25 19.25 37.00 113.50 20 - NIPH 9.00 0.50 6.00 22.00 10.00 7.00 8.00 62.50 20.1 - NVI 0.50 0.30 0.50 4.00 3.38 8.68 21 - INSA 1.75 0.55 0.55 1.05 9.50 10.40 27.00 50.80 21.1 - DGS 0.50 1.50 1.00 1.00 14.60 13.00 31.60 21.2 - AdP VALOR 0.65 1.50 3.00 6.50 5.00 2.00 2.00 20.65 22 - INSP 88.00 5.00 6.00 36.00 42.00 18.00 168.00 363.00 23 - NIJZ 7.00 7.00 5.00 46.00 17.00 82.00 23.1 - NLZOH 0.50 3.00 15.00 18.50 24 - ISCIII 1.00 0.50 1.00 1.50 12.00 3.00 20.00 39.00 24.1 - AEMPS 1.00 0.50 2.00 3.50 24.2 - UB 1.00 0.50 1.00 1.00 3.00 4.00 10.50 24.3 - USC 1.00 0.50 1.00 1.00 4.00 4.00 11.50 24.4 - USAL 1.00 0.50 2.00 2.00 5.50 25 - PHAS 1.00 0.50 1.00 2.00 22.00 20.00 20.00 66.50 25.1 - SLU 2.50 2.50 26 - UPHC 2.00 2.00 2.00 27.00 18.00 31.00 82.00 Total Person-Months 345.85 99.40 184.45 236.85 534.05 518.45 840.13 2759.18 14 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 LIST OF DELIVERABLES Deliverables Grant Preparation (Deliverables screen) — Enter the info. The labels used mean: Public — fully open ( automatically posted online) Sensitive — limited under the conditions of the Grant Agreement EU classified —RESTREINT-UE/EU-RESTRICTED, CONFIDENTIEL-UE/EU-CONFIDENTIAL, SECRET-UE/EU-SECRET under Decision 2015/444 Deliverable Deliverable Name Work Lead Beneficiary Type Dissemination Level Due Date No Package (month) No D1.1 Data Management Plan WP1 1 - SSI R — Document, report PU - Public 6 D1.2 EU-WISH: Key Advancements in WP1 1 - SSI R — Document, report PU - Public 36 Wastewater Surveillance in Europe D2.1 Dissemination and Communication plan WP2 17 - LIST R — Document, report PU - Public 6 D2.2 Technical Guidance for Presenting and WP2 17 - LIST R — Document, report PU - Public 20 Sharing Wastewater Surveillance Data D2.3 Dissemination Report WP2 17 - LIST R — Document, report PU - Public 36 D3.1 Evaluation Report WP3 11 - RKI R — Document, report PU - Public 36 D3.2 Integration of Wastewater Surveillance in WP3 2 - EODY R — Document, report PU - Public 36 PHPP D4.1 EU-WISH Sustainability Report WP4 19 - RIVM R — Document, report PU - Public 34 D4.2 EU-WISH Capacity Building Report WP4 20 - NIPH R — Document, report PU - Public 34 D5.1 Wastewater Surveillance State of the Art and WP5 9 - THL R — Document, report PU - Public 34 Future Priorities in EU Member States D6.1 Technical recommendations for wastewater WP6 1 - SSI R — Document, report PU - Public 36 surveillance and decision making 15 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Deliverables Grant Preparation (Deliverables screen) — Enter the info. The labels used mean: Public — fully open ( automatically posted online) Sensitive — limited under the conditions of the Grant Agreement EU classified —RESTREINT-UE/EU-RESTRICTED, CONFIDENTIEL-UE/EU-CONFIDENTIAL, SECRET-UE/EU-SECRET under Decision 2015/444 Deliverable Deliverable Name Work Lead Beneficiary Type Dissemination Level Due Date No Package (month) No D7.1 Best practices regarding the technical WP7 19 - RIVM R — Document, report PU - Public 34 protocols used in wastewater surveillance 16 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Deliverable D1.1 – Data Management Plan Deliverable Number D1.1 Lead Beneficiary 1 - SSI Deliverable Name Data Management Plan Type R — Document, report Dissemination Level PU - Public Due Date (month) 6 Work Package No WP1 Description EU-WISH DMP provides relevant metadata and information on key data used during EU-WISH - e.g. their availability. Sensitive information is retained at participating institutes. English, pdf. Deliverable D1.2 – EU-WISH: Key Advancements in Wastewater Surveillance in Europe Deliverable Number D1.2 Lead Beneficiary 1 - SSI Deliverable Name EU-WISH: Key Advancements in Wastewater Surveillance in Europe Type R — Document, report Dissemination Level PU - Public Due Date (month) 36 Work Package No WP1 Description This main output from EU-WISH will provide highlights of the achievements and recommendations. English, pdf. Deliverable D2.1 – Dissemination and Communication plan Deliverable Number D2.1 Lead Beneficiary 17 - LIST Deliverable Name Dissemination and Communication plan Type R — Document, report Dissemination Level PU - Public Due Date (month) 6 Work Package No WP2 Description A report that describes the strategy and tools. It sets out the dissemination and communication objectives, key messages, target audiences, communication channels, social media plan, planned budget and relevant indicators for monitoring and evaluation of the project’s dissemination and communication impact. Pdf. English. Deliverable D2.2 – Technical Guidance for Presenting and Sharing Wastewater Surveillance Data Deliverable Number D2.2 Lead Beneficiary 17 - LIST Deliverable Name Technical Guidance for Presenting and Sharing Wastewater Surveillance Data Type R — Document, report Dissemination Level PU - Public Due Date (month) 20 Work Package No WP2 Description 17 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Guidance document presenting how wastewater surveillance data can be efficiently disseminated to different audiences through dashboards. Pdf, English. Deliverable D2.3 – Dissemination Report Deliverable Number D2.3 Lead Beneficiary 17 - LIST Deliverable Name Dissemination Report Type R — Document, report Dissemination Level PU - Public Due Date (month) 36 Work Package No WP2 Description Interim Dissemination Report (M18) and Final Dissemination Report (M36) summarising the communication and dissemination activities of EU-WISH. The interim report focuses on describing the strategy and tools. Pdf, English. Deliverable D3.1 – Evaluation Report Deliverable Number D3.1 Lead Beneficiary 11 - RKI Deliverable Name Evaluation Report Type R — Document, report Dissemination Level PU - Public Due Date (month) 36 Work Package No WP3 Description Interim (M18) and final (M36) Evaluation Report. The interim report serves to confirm the progress, while the final report will compile the publicly publishable results from the evaluation, with concluding remarks on the entire action. Pdf, English Deliverable D3.2 – Integration of Wastewater Surveillance in PHPP Deliverable Number D3.2 Lead Beneficiary 2 - EODY Deliverable Name Integration of Wastewater Surveillance in PHPP Type R — Document, report Dissemination Level PU - Public Due Date (month) 36 Work Package No WP3 Description Report on integration of wastewater surveillance in public health preparedness plans. Pdf, English. Deliverable D4.1 – EU-WISH Sustainability Report Deliverable Number D4.1 Lead Beneficiary 19 - RIVM Deliverable Name EU-WISH Sustainability Report Type R — Document, report Dissemination Level PU - Public Due Date (month) 34 Work Package No WP4 18 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Description Final report on the sustainability aspects of EU-WISH. English, pdf. Deliverable D4.2 – EU-WISH Capacity Building Report Deliverable Number D4.2 Lead Beneficiary 20 - NIPH Deliverable Name EU-WISH Capacity Building Report Type R — Document, report Dissemination Level PU - Public Due Date (month) 34 Work Package No WP4 Description Report on the capacity building activities and future strategy. English, pdf. Deliverable D5.1 – Wastewater Surveillance State of the Art and Future Priorities in EU Member States Deliverable Number D5.1 Lead Beneficiary 9 - THL Deliverable Name Wastewater Surveillance State of the Art and Future Priorities in EU Member States Type R — Document, report Dissemination Level PU - Public Due Date (month) 34 Work Package No WP5 Description Report of current practices including a matrix of the activity levels in all EU countries, future priority list of targets for common implementation of wastewater surveillance in EU, and recommendations to international guidelines. English, pdf. Deliverable D6.1 – Technical recommendations for wastewater surveillance and decision making Deliverable Number D6.1 Lead Beneficiary 1 - SSI Deliverable Name Technical recommendations for wastewater surveillance and decision making Type R — Document, report Dissemination Level PU - Public Due Date (month) 36 Work Package No WP6 Description Document and code, collecting all outputs from the various tasks and subtasks. These outputs will be made available as they are produced and validated. English, pdf. Deliverable D7.1 – Best practices regarding the technical protocols used in wastewater surveillance Deliverable Number D7.1 Lead Beneficiary 19 - RIVM 19 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Deliverable Name Best practices regarding the technical protocols used in wastewater surveillance Type R — Document, report Dissemination Level PU - Public Due Date (month) 34 Work Package No WP7 Description Report describing technical protocols used in wastewater surveillance. Pdf, English 20 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 LIST OF MILESTONES Milestones Grant Preparation (Milestones screen) — Enter the info. Milestone Milestone Name Work Package No Lead Beneficiary Means of Verification Due Date No (month) 1 Kick-off meeting WP1 1 - SSI Kick-off meeting held. 2 2 Advanced draft of D1.2 WP1 1 - SSI Draft circulated. 27 3 Website and social media WP2 1 - SSI Website and social media accounts established 1 4 Project leaflet WP2 1 - SSI Leaflet available for distribution 4 5 Dissemination and communication plan WP2 17 - LIST The plan is available for participants 6 6 Consolidation of an operational stakeholder WP2 17 - LIST Listing available for participants 6 listing for dissemination 7 Workshop about dashboards and other WP2 17 - LIST Workshop held 18 platforms for wastewater surveillance information 8 Survey on self-assessment of success of EU- WP3 11 - RKI Survey distributed 24 WISH start 9 Identification of EU-WISH outputs that could WP3 2 - EODY Input provided to D1.2 26 be integrated in Public Health Preparedness Plans 10 Progress report on sustainability aspects of WP4 19 - RIVM Progress report shared with consortium 22 Governance Framework participants 11 Progress report on capacity building activities WP4 20 - NIPH Progress report shared with consortium 22 participants 12 Survey of wastewater surveillance activities WP5 9 - THL Electronic survey results made available to the 12 in EU consortium participants 13 International workshop WP5 9 - THL Workshop held 24 21 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Milestones Grant Preparation (Milestones screen) — Enter the info. Milestone Milestone Name Work Package No Lead Beneficiary Means of Verification Due Date No (month) 14 Priority setting WP5 9 - THL Updated list of wastewater surveillance priorities 32 made available to the consortium participants 15 Survey report of statistical methods and WP6 3 - AGES Report is made available to the consortium 8 surveillance 16 First draft combined report on sampling WP6 1 - SSI Draft report is made available to the consortium 14 methods 17 Finalisation of guidance document for WP6 1 - SSI Document is made available to the consortium 33 statistical data analysis 18 Electronic survey on protocols conducted WP7 19 - RIVM Survey conducted. 12 19 Inventory of protocols and best practices WP7 19 - RIVM The key results are made available to the 18 consortium participants. 20 Ring trials and on-site training activities WP7 19 - RIVM Key results are made available to the participants 32 organised 21 Evaluation plan WP3 11 - RKI Evaluation plan distributed to WP and Task 6 leaders. 22 Online Training Module WP4 17 - LIST Online training material ready to be used by the 24 project. 22 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 LIST OF CRITICAL RISKS Critical risks & risk management strategy Grant Preparation (Critical Risks screen) — Enter the info. Risk Description Work Package Proposed Mitigation Measures number No(s) 1 Delays in work (likelihood: medium, impact: WP4, WP5, WP6, PMT monitors the progress of work continuously at task level. Support and challenge-solving medium) WP2, WP7, WP3, are offered proactively. The work plan has minimal dependencies, and those identified (e.g., WP1 WP7 depends on input from WP5) were taken into account in the schedule. The participating institutes have skilled staff that can address the challenges. More staff can be allocated to activities as needed. 2 Technical challenges (likelihood: medium, impact: WP4, WP5, WP6, Technical challenges of different levels – from using a shared working platform to laboratory medium) WP2, WP7, WP3, methods for different targets- may delay the work. However, they are considered to be WP1 learning opportunities. The participating institutions have skilled staff that can address the challenges. 3 Loss of key personnel or partners (likelihood: WP4, WP5, WP6, The participating institutes have several staff members with relevant expertise and medium, impact: low) WP2, WP7, WP3, experiences. Replacements and additional staff can be allocated to the project without delays. WP1 4 Cross-border health threat or geopolitical or other WP4, WP5, WP6, The participating institutes, and the consortium as a whole, have several staff members with event that forces partner institutes to shift focus to WP2, WP7, WP3, relevant expertise and experiences. Meetings can be organised as virtual meetings. response actions or makes it not possible to have in- WP1 person meetings (likelihood: medium, impact: low) 5 Cyberattack or other disrupting situation WP4, WP5, WP6, All participating institutes have efficient risk management for possible disrupting situations. (likelihood: medium; impact: low) WP2, WP7, WP3, Backup copies are taken of all key documents, and alternative ways of communication will be WP1 agreed. Cybersecurity of IT solutions is a key focus area, and best solutions will be discussed. Collaboration with EU-HIP will be useful in this. 6 Challenges in interactions with stakeholders and WP4, WP1 The collaboration with stakeholders builds on previous collaborations. Many participating decision-makers, e.g. invited stakeholders decline or institutes have provided support to decision-makers during COVID-19 pandemic and in do not respond (likelihood: low, impact: low) relation to other health threats, and thus the links to key decision-makers are already well established. If needed, alternatives are found to cover the areas of expertise. 7 Challenges in managing the large consortium WP1 The consortium is large but highly motivated to work together, which was demonstrated (likelihood: low, impact: low) during preparation of the proposal. The coordination team is experienced in managing large 23 Project: 101140460 — EU-WISH — EU4H-2023-JA-IBA Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Critical risks & risk management strategy Grant Preparation (Critical Risks screen) — Enter the info. Risk Description Work Package Proposed Mitigation Measures number No(s) projects. Support from HADEA is utilised. Challenges in the management and possible disputes between partners are addressed proactively and actively in a collaborative manner. Consortium Agreement is prepared and signed. 24 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 11 December 2023: Description of the changes made. The proposal addresses the criterion very well, but a The small number of Changes made are small number of shortcomings are present. shortcomings have been described below. addressed. General objective is clear and relevant to the call. No changes needed Specific objectives (SO) are likewise consistent, presented in logical sequence although are described very briefly. All SOs are supported with adequate, specific and quantifiable indicators, referring to the activities in the field of strengthened wastewater surveillance alongside baseline and target values. The connections of the JA with other projects and Proposal text length Details were added. existing European initiatives in the wastewater constraints limited the surveillance are covered only in general terms (e.g. possibility for providing ongoing JA, DURABLE, EU-HIP). However, the additional details. proposal does not provide sufficient and clear details on the complementarity and synergies in order to detect the overlapping efforts between the proposal and other initiatives in the field. The potential to develop a mutual trust and cross The exploration of We specified the border cooperation is significant. However, the specifications and collaboration with specific details are not clearly reflected on some of possibilities for IT- EU-HIP and JRC results, for example, how data sharing IT-platform platform interoperability (DEEP dashboard).in related to wastewater surveillance will cooperate with and data-sharing will be the description. national dashboards and other relevant IT-platforms done as part of the (Task 2.4) since the description of these activities is project. Importantly, there insufficient. will be collaboration with EU-HIP and JRC (DEEP dashboard). Project demonstrates a consistent design and The countries have No changes made structure of WPs. There are sound links between different starting points identified problems and proposed actions. However, due to different level of the proposal has a number of shortcomings related to maturity of their systems, the technical quality of implementation due to the and substantial capacity limited provided information. For example, the building activities will take capability of the laboratories to perform analyses of place to enhance the samples in some countries (i.e., Malta, Ukraine) is not capabilities of countries. clearly described and therefore it remains unclear how analyses of the samples will be fulfilled by the country. The overall methodological approach is appropriate, The overall approach is Description was however, specific methods are not sufficiently focused on collaborating, elaborated. elaborated. For example, how sampling, transporting, sharing, comparing and and analysing of samples as well as sharing the best evaluating. Some details practices among different laboratories and activities of the methodology will will be ensured. It remains not clear what be decided after questionnaires will be applied to identify the discussions with other wastewater surveillance methodologies used by the related projects and different laboratories or how the suitability of targeted HERA at the beginning of sequencing and metagenomics for screening the project. This is wastewater will be evaluated. important to ensure synergies. Moreover, some details can only be finalised after the first results are available from e.g. literature reviews and mapping of 1 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 approaches and sharing experiences. Managerial structures and procedures are generally Key persons to the Description was described however, the mechanisms are not coordination/managemen elaborated. sufficiently clear. The composition of the coordinator t team now have been team is not described in details. A governance is successfully recruited foreseen, yet its operational functioning in the and we are able to consortium is not defined or properly justified. provide more details. A Consortium Agreement is being prepared, where details will be agreed among the participants. The consortium already has a shared online workspace that is actively used. Risk analysis addresses potential risks and suggests Risk analysis and A risk focusing on appropriate mitigation measures. However, the risk management will be managing the large management plan fails to address in details the risks ongoing throughout the consortium was deriving from core WP implementation and large project implementation. added, and the consortium engagement. Technical challenges are The risks related to description of the not adequately addressed either (e.g., risks related to management of a large one related to the cybersecurity of the IT platform are neither project are indeed cybersecurity was specified nor managed). relevant to prepare for, elaborated. and to mention specifically. In relation to the identification of pathogens and For the specific list, EU- The collaboration chemical substances, there is a good alignment with WISH will collaborate with DURABLE and those identified by HERA. Emerging pathogens are with HERA and EU-HIP on this is not clearly defined and listed in the proposal, although DURABLE. The list has now specifically a preliminary list would be expected at this stage. been prepared and is mentioned. available for EU-WISH. Moreover, EU-HIP has collaborated with HERA for a related list for landscape analysis, this is also available for EU- WISH. The activities planned for setting up the wastewater The plans are specified No changes made. surveillances, based on the different identified and finalised at the pathogens and on chemical substances, are very beginning of the project. briefly described. The duration of WPs and tasks as well as the timeline WP timelines were No changes made of the WPs are not convincingly justified, therefore the developed based on judgement of the appropriateness of the timeline is extensive experience not fully credible. with EU project planning and thorough exploration of partner capabilities. Focus was on avoiding dependencies and ensuring sufficient flexibility for final details which are based on outcomes of the work. The impact of the proposal EU-WISH would improve To increase the impact of . Changes have been by further developing activities related to enhancing, the project, the additional made to descriptions 2 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 extending and consolidating national wastewater amount to match the of WP1 and WP3 to surveillance for public health across Europe. total amount of funding describe the available was requested, expanded activities and has been for capacity building allocated.was. SSI, the coordinator, under WP1, will conduct additional networking, knowledge exchange and capacity building workshops targeting EU and international stakeholders, LMIC in particular. EODY, the scientific and technical co-coordinator, will conduct at least one tabletop exercise with EU and international stakeholders to demonstrate the use of the preparedness plans recommendations during an emergency response and will also develop a toolkit for such emergency response tabletop exercises at national level. The overall budget is adequate and related to project Sub-contracting is Clarification of activities. There is a budget asymmetry that is partly needed where partners subcontracting was explained by the roles of partners, with coordinator do not have the added for 4 of the 5 being allocated a substantially higher share of the necessary in-house partners requesting budget (1/10). There is a lack of clarity in details competences to complete it. regarding subcontracting activities, e.g. a certain activities towards subcontractor/IT company is envisaged for activities the project objectives. concerning database-related expertise, which is Some details were not valuable for the proposal. However, the reported available at proposal uncertainty regarding additional possible submission stage. subcontractors is not sufficiently justified: at the proposal stage it is expected that activities for which The coordinating institute subcontracting may be needed are identified clearly. participates also substantially in the technical work. The arrangements regarding the legal and financial Proposal text length No changes made aspects of the project are considered, however a constraints limited the detailed description of financial management is not possibility for providing elaborated. additional details. In general, the consortium demonstrates a very good During and through the Additional staff and complementarity of the necessary interdisciplinary project partners will build experts have been expertise. The project team demonstrates the capacity and added to paragraph capacity to implement the project and displays a underrepresented 2.3 in the proposal. suitable and comprehensive array of different competences will be competences. Yet, some expertise, i.e., gathered and allocated to bioinformaticians is underrepresented. This is a minor the project. shortcoming. The roles of some partners remain unspecified, for Like the other partners in Clearer description example, it is not sufficiently explained how the task 7.2, Regione of all partner roles partner No. 41 (REGIONE LOMBARDIA) will Lombardia will support added to the task activities in developing description. methodological tools to 3 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 contribute to the Task 7.2 “Advanced sequencing identify the laboratory techniques and advanced sequence data analysis”. procedures used for the specific targets and surveying the used wastewater surveillance of methodologies, protocols and technical approaches in the MSs. Problem solving structures and mechanisms are Proposal text length No changes made presented in fairly generic terms, thus the proposal constraints limited the does not sufficiently consider and describe the possibility for providing mechanisms (e.g. consensus, qualified majority) to additional details. solve the disputes between partners both on the routine level and in cases of emerged managerial issues. The target groups are identified. However, a tailored Proposal text length No changes made framework for target audiences and related specific constraints limited the impacts as well as mechanisms for their achievement possibility for providing are not elaborated. additional details. Communication and dissemination strategies provide Proposal text length No changes made a generic outline of efforts that will be implemented on constraints limited the international, national and regional levels exploiting possibility for providing project website, project leaflets and social media. additional details. Target audiences are generally defined, but more explicit details on what are the potential stakeholders in Member states and developing countries, what activities will be conducted and how specifically they will be reached on all three levels are not provided. Relevant details on how interaction with entities involved in wastewater-based epidemiology will be developed are not sufficiently described. Sustainability strategy is generally outlined, providing The details of the No changes made an overview of planned activities by establishing the sustainability strategy Sustainability working Group, mapping national and and engagement regional structures, engaging countries which are not mechanisms of third participating in the JA. However, engagement countries will be specified mechanisms of third countries (non-EU countries) in at the start of the project. JA activities is not sufficiently explained. For the latter, synergies with EU-HIP project are foreseen. Budget increase and specifications The additional budget Detailed budgets was allocated, and all adjusted. €42.000 detailed budgets were additional budget checked and updated for was allocated to the travel costs, and travel unit cost specifications were across all partners as added. well as raising the units for specific partners. A review of the budget showed that one beneficiaries’ request for other goods and services costs was missing from the Tender and Funding Financial Information 4 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 form. Other minor alignments between the detailed budget and the Grant Agreement Data Financial Information were performed. Lastly, the budget for SSI and EODY was increased to reflect the increased activities for capacity building and sustainability of the project. Other changes made The participation in the Participants listed at different tasks under task-level specified. WPs was checked by all participants. Missing Sub-contracting added Aligning detailed budgets Adp Valor and CIPH with part B. subcontracting added in accordance to FO comments. Kick-off meeting elaboration Kick-off meeting has Justification of been changed from M2 to postponing the kick- M3 off meeting added. JRC DEEP dashboard Specific reference to the DEEP dashboard was added Deliverable names A number of deliverable D2.2, D3.2, D4.2, names have been D5.1, D6.1 and D7.1 shortened were given more concise names MS22 Online Training Module New milestone added to WP4 D2.1 D2.1 re-added D2.1 was deleted by mistake, has been re-added Minor text adjustments A number of minor We made on request additions from HADEA High PM rates NIPH, UCD, LIST and Justification for high LNS high income PM rates for high countries. income countries added. TECHNICAL DESCRIPTION (PART B) COVER PAGE 5 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Part B of the Application Form must be downloaded from the Portal Submission System, completed and then assembled and re-uploaded as PDF in the system. Page 1 with the grey IMPORTANT NOTICE box should be deleted before uploading. Note: Please read carefully the conditions set out in the Call document (for open calls: published on the Portal). Pay particular attention to the award criteria; they explain how the application will be evaluated. PROJECT Project name: EU Wastewater Integrated Surveillance for Public Health Project acronym: EU-WISH Coordinator contact: Coordinator: Steen Ethelberg (SSI), Pikka Jokelainen (SSI) TABLE OF CONTENTS TECHNICAL DESCRIPTION (PART B) .......................................................................................................................... 5 COVER PAGE ............................................................................................................................................................. 5 PROJECT SUMMARY ................................................................................................................................................. 7 1. RELEVANCE ........................................................................................................................................................... 8 1.1 Background and general objectives .................................................................................................................... 8 1.2 Needs analysis and specific objectives ............................................................................................................... 9 1.3 Complementarity with other actions and innovation — European added value .................................................. 10 2. QUALITY ............................................................................................................................................................... 11 2.1 Concept and methodology ................................................................................................................................ 11 2.2 Consortium set-up............................................................................................................................................. 14 2.3 Project teams, staff and experts ........................................................................................................................ 23 2.4 Consortium management and decision-making................................................................................................. 39 2.5 Project management, quality assurance and monitoring and evaluation strategy .............................................. 40 2.6 Cost effectiveness and financial management .................................................................................................. 40 2.7 Risk management ............................................................................................................................................. 41 3. IMPACT ................................................................................................................................................................. 42 3.1 Impact and ambition.......................................................................................................................................... 42 3.2 Communication, dissemination and visibility...................................................................................................... 43 3.3 Sustainability and continuation .......................................................................................................................... 44 4. WORKPLAN, WORK PACKAGES, ACTIVITIES, RESOURCES AND TIMING ..................................................... 46 4.1 Work plan ......................................................................................................................................................... 46 4.2 Work packages, activities, resources and timing ............................................................................................... 46 Work Package 1 ............................................................................................................................................... 48 Work Package 2 ............................................................................................................................................... 52 Work Package 3 ............................................................................................................................................... 55 Work Package 4 ............................................................................................................................................... 60 Work Package 5 ............................................................................................................................................... 64 Work Package 6 ............................................................................................................................................... 70 Work Package 7 ............................................................................................................................................... 74 Subcontracting ................................................................................................................................................. 78 Timetable ......................................................................................................................................................... 83 5. OTHER .................................................................................................................................................................. 85 5.1 Ethics ................................................................................................................................................................ 85 5.2 Security............................................................................................................................................................. 85 6. DECLARATIONS ................................................................................................................................................... 85 ANNEXES ..................................................................................................................................................................... 86 #@APP-FORM-EU4H@# #@PRJ-SUM-PS@# [This document is tagged. Do not delete the tags; they are needed for the processing.] 6 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 PROJECT SUMMARY Project summary See Abstract (Application Form Part A). #§PRJ-SUM-PS§# #@REL-EVA-RE@# #@PRJ-OBJ-PO@# 7 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 1. RELEVANCE 1.1 Background and general objectives Background and general objectives Describe the background and rationale of the project. How is the project relevant to the scope of the call? How does the project address the general objectives of the call? What is the project’s contribution to the priorities of the call? One of HERA’s core missions is contributing to the strengthening of health security coordination and collaboration within EU, during both preparedness and crisis times. HERA is responsible for the assessment of health threats and intelligence gathering in the area of medical countermeasures and is building capacities for horizon scanning, foresight, data analysis, market intelligence, sequencing and environmental surveillance - including wastewater surveillance. This is done in close collaboration with Member States, other Commission services and agencies. Wastewater surveillance and related epidemiological assessment has been used during the COVID-19 pandemic as a tool to ensure timely and relevant intelligence gathering, yielding actionable, complementary data. Joint activities have proven useful in this, and EU-WISH will build on and extend those activities. Regular surveillance of wastewaters in combination with other indicators for the management of the COVID-19 pandemic has facilitated decision making and it is especially important in low-testing periods. As a consequence, wastewater surveillance has been included more systematically in the national surveillance strategies for the prevention and control of the COVID-19 pandemic. However, the level of maturity of the detection of the SARS-CoV-2 and its variants in wastewater varies among Member States. EU-WISH is a joint action that supports the policy priority to strengthen the capability of the European Union for prevention of, preparedness for, and rapid response to, serious cross-border threats to health particularly through supporting data gathering, information exchange and surveillance, as well as Health in all policies. It implements the EU4Health Programme’s general objective of protecting people in the Union from serious cross-border threats to health and strengthening the responsiveness of health systems and coordination among the Member States to cope with serious cross-border threats to health (Article 3, point (b) of Regulation (EU) 2021/522) through the specific objectives defined in Article 4, points (a) and (b), of Regulation (EU) 2021/522. EU-WISH is fully aligned with the themes, priorities and objectives of the call (EU4H-2023-JA-IBA-02 — (CP-g-23-18) Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA)). EU-WISH contributes to the achievement of the EU4Health Programme’s general objective of protecting people in the Union from serious cross-border threats to health and strengthening the responsiveness of health systems and coordination among the Member States. The focus of EU-WISH is to support activities to enhance and improve national public health wastewater surveillance capacities by strengthening knowledge exchange and sharing best practices based on scientific evidence. The activities of this joint action will target and bring together relevant structures at national level and will facilitate the integration and complementarity of wastewater surveillance with other surveillance systems with a public health perspective to strengthen preparedness and response to cross border health threats. EU-WISH is a strong consortium that can contribute to a vision and activities for wastewater surveillance at not only European, but also global level. General objective of EU-WISH: EU-WISH supports the participating countries to enhance, extend and consolidate wastewater surveillance for public health 8 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 1.2 Needs analysis and specific objectives Needs analysis and specific objectives Describe how the objectives of the project are based on a sound needs analysis in line with the specific objectives of the call. What issue/challenge/gap does the project aim to address? The objectives should be clear, measureable, realistic and achievable within the duration of the project. For each objective, define appropriate indicators for measuring achievement (including a unit of measurement, baseline value and target value). Needs analysis for EU-WISH was performed based on available information from other initiatives, information of HERA’s priorities, and the expertise and experiences of the consortium members. Specific Objectives were formulated, aligned with the call, and are achievable within the duration of the project. They pave the way for the ambitious overall aim of EU-WISH to be a key contributor to a vision and key activities for wastewater surveillance at national, European and global levels. Conducting the needs analysis highlighted that a large consortium is optimal for addressing the needs – countries can learn a lot from each other. Need 1: Enhancing, extending and consolidating national wastewater surveillance for public health The wastewater surveillance systems of Member States have different level of maturity across related capacities, infrastructures, processes and frameworks, as well as local nuances - however, all countries will benefit from enhancing, extending and consolidating their wastewater surveillance, targeting relevant phases of the workflow processes. Specific Objective 1: Obtain an overview of current key aspects of national wastewater surveillance across the participating countries Specific Objective 2: Enhance, extend and consolidate national wastewater surveillance addressing country-specific needs Specific Objective 3: Improve comparability and interoperability of national wastewater surveillance data to inform decision making Need 2: Collaboration and sharing to avoid duplication of efforts and to ensure synergies Strengthening wastewater surveillance is a useful tool for improving preparedness, and several initiatives at national and international levels are related to wastewater surveillance. Coordinating the improvement of wastewater surveillance as a large consortium is needed to minimize the risk of duplication of efforts and to ensure synergies. Collaboration across partners, across countries, with other projects and initiatives, as well as with HERA and other stakeholders, such as JRC, ECDC and WHO, are crucial to ensure complementarity, alignment, and division of roles anresponsibilities. The experiences and outcomes of EU-WISH will be of interest also to countries that are not part of the consortium, and thus dissemination targeting these countries is important. Collaboration is the key, and coordinated collaboration is the optimal approach. Specific Objective 4: Establish collaborative structures and processes to enable collaboration and sharing of experiences in and among countries included in EU-WISH. Specific Objective 5: Establish collaborative structures and processes with external stakeholders in countries included in EU-WISH, as well as with HERA and relevant EU agencies Specific Objective 6: Create structures for disseminating experiences to support countries that are not part of EU-WISH, including global actors, and low- and middle- income countries Each Specific Objective is related to Key Performance Indicator(s), as presented in Table 1. KPIs will be further and more specifically elaborated during the first months of the project’s implementation. 9 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 TABLE 1. Planned Key Performance Indicators (KPIs) and related Specific Objectives. The achievements and reaching the KPIs will be reported in D1.2. Key Performance Indicators Baseline Target Related Specific Objectives KPI 1 - Number of national wastewater surveillance No data At least 10 1,2 strategies implemented and integrated at national level with other types of surveillance indicating where relevant if these are used to informed decision making KPI 2 - Number of wastewater surveillance strategies No data At least 3 1,2,3 developed to address cross-border health threats specific to priority pathogens or relevant substances KPI 3 - Number of wastewater samples processed in the No data At least 500 2 EU following implementing aligned technical procedures KPI4 - Increase in wastewater surveillance capacity (e.g. Not Measurable 1,2 in samples taken, collection points, parameters applicable increase in at assessed, work force) at country level following the least 50% of implementation of the proposal activities in comparison participating with the number prior implementation countries KPI 5 - Number of sites, local and/or regional Not At least 10 2 laboratories, with increased wastewater surveillance applicable capacity KPI 6 - Number of activities to increase in awareness of Not At least 3 4, 6 wastewater as a surveillance tool as part of the applicable communication activities KPI 7 - Number of national, EU and international relevant Not At least 10 5 authorities and stakeholders engaged applicable KPI 8 - Number of activities carried out that have been Not At least 3 5 opened or shared with low- and middle- income countries applicable and global stakeholders KPI 9 - Dissemination on social media to support Negligible #EU_WISH 6 awareness about EU-WISH and wastewater surveillance social hashtag used media at least 100 attention times #@COM-PLE-CP@# 1.3 Complementarity with other actions and innovation — European added value Complementarity with other actions and innovation Explain how the project builds on the results of past activities carried out in the field and describe its innovative aspects. Explain how the activities are complementary to other activities carried out by other organisations. Illustrate the European dimension of the activities: trans-national dimension of the project; impact/interest for a number of EU countries; possibility to use the results in other countries, potential to develop mutual trust/cross-border cooperation among EU countries, etc. Which countries will benefit from the project (directly and indirectly)? Where will the activities take place? 10 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 EU-WISH is fully aligned with and complements national public health strategies as well as other on-going investments and capacity-building initiatives. The consortium is extremely well placed to ensure this: large consortium, a network of networks. Its European trans-national dimension is very strong. EU-WISH is a joint action that will build on the activities started as part of the HERA incubator and the Commission Recommendation to support a consistent approach to the use of wastewater monitoring to track SARS-CoV-2 and its variants and supported Member States to accelerate the deployment of wastewater surveillance for COVID-19. In addition, DG JRC has initiated, stimulated and coordinated the authorities’ network (national and international level including stakeholders), the development of a dashboard for exchanging of relevant information (DEEP) and organised the testing of samples from super-sites (used to compare and assess wastewaters of residential population vs. transportation hubs) in Lisbon, Madrid, Nicosia, Amsterdam, Frankfurt and Prague. Joint efforts have proven useful in providing insights and understanding how SARS-CoV-2 variants move across borders. Therefore, extending the support programmes set up under the HERA Incubator is essential to strengthen not only the detection and identification of SARS-CoV-2 variants in the Union but to also build on preparedness to other serious cross-border health threats such as those identified by HERA in its health threat prioritisation. EU-WISH will collaborate with HERA and the JRC as well as with other relevant EU and global bodies e.g. the ECDC, the WHO, the UN Environment Programme (UNEP). EU-WISH will provide support to Members States that do not participate in the action as well as global actors and low- and middle-income countries that can benefit from the exchange of experience and lessons learned. In addition, there will be coordination and duplications will be avoided with the EU sewage sentinel system to be established under procurement CP-p-23-20. EU-WISH will facilitate countries to collaborate and coordinate with HERA, and with other countries. While activities will take place largely at country level, a main focus is on sustainability of the collaborations and networks built. It is essential that the work under EU-WISH is carried out in a way that is complementary to national public health strategies as well as other on-going investments and capacity-building initiatives. The consortium is extremely well placed and informed of on-going and planned initiatives and will actively inform them about the EU-WISH. EU-WISH will work closely with other initiatives collaborating with HERA, in particular with DURABLE, that is HERA’s laboratory network, and EU-HIP, that works together with HERA towards interoperability of national IT-systems with HERA’s IT-platform. The close links with these projects is ensured by SSI being the coordinator of EU-HIP and a core partner in DURABLE – the three projects are managed at SSI by a designated team. The three projects have different key focus areas, and there is no overlap. EU-WISH is the only one with focus on wastewater surveillance. DURABLE will maintain a list of priority pathogens that will be useful for targeting the work in EU-WISH; the structure of the list and first update are available when EU-WISH starts. Moreover, a related list compiled in EU-HIP in collaboration with HERA for a landscape analysis will be useful for the EU-WISH. The time plan of EU-WISH was planned to ensure timely contributions to the DURABLE and EU-HIP. DURABLE will be interested in early warning aspects of the work in EU-WISH, and EU-HIP is interested in the interoperability of the data produced. Collaboration with EU-HIP will support the FAIR-principle: data should be interoperable. Major synergies among the three projects are expected, and they can be used as examples of cross-project synergies. Other key projects for collaboration include the UNITED4Surveillance and the upcoming One Health surveillance projects. Also with these, the close links are ensured by SSI being a core participant in already ongoing UNITED4Surveillance and coordinator of one of the upcoming One Health surveillance projects. The projects have different key focus areas, and there are no overlaps. EU-WISH is the only one with focus on wastewater surveillance. UNITED4Surveillance focuses on surveillance based on samples from humans, and the One Health surveillance projects have their main focus on surveillance based on samples from animals. The latter covers also environmental samples, and effluents and wastewater are listed as eligible targets for Disease Y (previously unknown disease in animals), while importance of ensuring avoiding overlap with EU-WISH (referred to as the call ID) is emphasised. Together, EU-WISH, UNITED4Surveillance and the One Health surveillance projects will shape the future of integrated surveillance using complementary approaches – importantly, including wastewater surveillance. #§COM-PLE-CP§# #§PRJ-OBJ-PO§# #§REL-EVA-RE§# #@QUA-LIT-QL@# #@CON-MET-CM@# 2. QUALITY 2.1 Concept and methodology 11 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Concept and methodology Outline the approach and methodology behind the project. Explain why they are the most suitable for achieving the project’s objectives. Collaboration and complementarity: EU-WISH brings together a high number of Member States’ authorities such as public health ministries, health institutes and laboratories and other relevant structures at national, regional and local level that carry out or plan to carry out wastewater surveillance activities. The overall approach has focus on facilitating collaboration across the participating countries and with other initiatives as well as with HERA – this ensures complementarity and enables identifying synergies. EU-WISH builds on the work done earlier and takes into account the different level of maturity of wastewater surveillance in different countries when formulating and sharing best practices for the different priority targets identified in accordance with HERA’s prioritisation and the provisions of the revised Urban Wastewater Directive, EU-WISH actively includes HERA and JRC in the governance structure in order to ensure complementarity with on-going activities in the field. EU-WISH aims at ensuring compliance with existing recommendations and guidance (e.g. the EASA/ECDC guidance, JRC guidance) and progress towards compliance with the requirements to be established as part of the future revision of the Urban Wastewater Treatment Directive. The coordination approaches focus on facilitating collaboration and identifying synergies with other projects and initiatives. Key cross-project collaborations will be established with DURABLE, EU-HIP, UNITED4Surveillance and the upcoming One Health surveillance projects – to provide complementary support to HERA and to develop and shape integrated surveillance using complementary approaches. Strategies and procedures: EU-WISH will contribute to define and extend wastewater surveillance strategies and harmonise procedures by maintaining and extending the current SARS-COV-2 surveillance capacities, including for AMR, vaccine-derived poliovirus variants and emergent pathogens to ensure better preparedness. Wastewater surveillance differs from several other types of surveillance by having complex requirements for epidemiological data analysis and for integration into existing surveillance. Depending on the purpose of surveillance and the target of analysis, very different analytical paths might be taken and a number of factors need to be taken into consideration. EU-WISH uses different approaches, including mapping of current systems supported by questionnaires and conducting literature studies, development of protocols, statistical analysis tools and dashboards, and coordinating ring trials and capacity building. The focus covers the whole chain from sampling and transporting to analysing samples as well as sharing the best practices among different laboratories. Sharing, comparing and evaluation will support identifying the best options for sustainable wastewater surveillance. Collaboration with other projects and HERA will be important in particular for the questionnaires planned – this will build on the positive experience from EU-HIP project where important synergies and good solutions were identified across relevant projects and with HERA. EU-WISH will deliver all the outputs specified in the call: - A list of priority pathogens and substances to be monitored in line with the HERA threat prioritisation, aligned with the work done in DURABLE task 9.1; - Setting up of objectives for the different priority threats identified, e.g. detecting emerging threats, monitoring on-going events, assessing trends; - Definition of strategic sampling location, collection, frequency and transportation responding to the objectives established; - Identification of population/areas to be covered (e.g. communities, transports hubs, etc.); these sampling strategies include so-called super-sites, airports and aircrafts where this is relevant for the priority threat; - Definition of how results will be collected, analysed (including. through metagenomics and next- generation sequencing), interpreted and translated depending on the objectives set up; these will consider international data interoperability and sharing in collaboration with EU-HIP; - Implementation plan for modelling and integration into existing public health surveillance systems, including clinical surveillance; - Capacity building plan and implementation by exchange of experience, networking and training and development of educational materials for integration into (existing) diverse discipline programmed for target audiences (e.g. engineers, physicians, epidemiologists). This will also consider global actors and allow low- and middle- income countries to benefit from the work done; 12 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 - Procedures to submit samples to the EU sentinel system in the context of an emergency. EU-WISH will contribute to define technical procedures for wastewater surveillance, delivering on: - Guidance documents, protocols or the like for the alignment of methods for e.g. detection, normalisation, data visualisation used by Member States to the extent needed; - Plan for the identification and exchange of best practices for various purposes and resource settings as well as capacity building plan and implementation capacity development, exchange of experience, networking and training; these activities will also consider global actors and allow low- and middle- income countries to benefit from the work done; - Guidance documents, white papers or the like for enhancing comparability of data, interoperability of IT platforms, reporting and sharing of data with DEEP; these will consider international data sharing, and will be done in collaboration with EU-HIP; Sustainable governance framework: EU-WISH will contribute to define and establish a sustainable governance framework for wastewater surveillance, including: - Strategy to enhance EU, European and international coordination on wastewater surveillance; - mapping of authorities and stakeholders at EU level and other actors and subsequent engagement. This will include the identification of relevant public health and environmental authorities, institutes and laboratories at country level with the aim to ensure wastewater surveillance integration into other types of surveillance; - interaction and coordination with on-going activities at international level including with the WHO and other global actors supporting and implementing wastewater activities at supranational level, in order to move towards the establishment of a global wastewater surveillance sentinel system; - capacity development, exchange of experience, networking and training. This will also consider global actors and low- and middle- income countries. EU-WISH has focus on sustainability, and will define a sustainability plan, including financial aspects, for the continued implementation beyond the project duration. For ensuring sustainability EU-WISH will develop a governance framework with the engagement of all relevant national, EU and international stakeholders, will conduct a financial analysis of wastewater surveillance implementation, will assess capacity building needs and will develop and implement capacity building material and courses. Communication and FAIR-principle to support achieving impact: EU-WISH has focus on communication and dissemination, following FAIR principle and aiming at impact. EU-WISH will define a communication strategy, including: - Mapping of relevant stakeholders for dissemination (e.g. physicians, decision makers, technicians, engineers) and specifically targeted communication strategies (e.g. newsletter); - Project website and Zenodo community, integration into DEEP, presentation of the project on the participants’ websites, informing on the objectives and results of the project); - Project leaflet (informing on the objectives and results of the project); - A Data Management Plan, a living document describing how the relevant documentation and data generated from the implemented activities will be shared in the public domain in a timely manner; - Dissemination report (Interim report and final report). Identification and mapping of stakeholders relevant for dissemination (national, EU and international) will be implemented in order to best design the dissemination, communication and sustainability activities. A stakeholder database will be created and a strategic dissemination plan will be developed. Traditional and innovative dissemination and communication approaches will be used for increasing EU-WISH’s visibility, raising awareness and communicating the project’s scientific results. Support to MS for creating or further developing national dashboards for wastewater surveillance and aligning them with DEEP and HERA’s IT-Platform (in collaboration with EU-HIP and to the extent that the latter platforms have been developed) will be a central element of the project, ensuring data sharing and effective data visualization, contributing further to the integration of wastewater surveillance with other surveillance approaches. Complementary approaches: In the technical front, surveys will be designed and implemented for mapping current wastewater surveillance systems, choose the priority targets at MS and EU level and obtain information on the state-of-the-art regarding the integration of wastewater surveillance with other surveillance systems. Scoping reviews will also be used. The above will allow the assessment of the level of maturity of wastewater surveillance in each MS and thus the design of appropriate capacity building 13 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 and engagement strategies, the definition of wastewater surveillance objectives for the priority targets identified (including the targets in the HERA prioritisation list, and in collaboration with DURABLE) and the identification of public health success stories involving the integration of wastewater surveillance with other surveillance systems. The latter will lead to the development of recommendations for the effective integration of wastewater surveillance into other surveillance systems, focusing on complementarities and expanding and strengthening implemented systems for monitoring and early warning for future outbreaks of infectious diseases, AMR and other health threats. In addition, to strengthen the applicability of wastewater surveillance across the MSs, and ultimately globally, EU-WISH will identify best practices with regard to technical sampling and laboratory protocols used for the specific targets selected across MS and globally. Questionnaire surveys among MS and literature reviews that encompass the global scene will be conducted. Inter-laboratory ring-trials and on- site training events will be organised to validate the clearly defined protocols selected and test their comparability among different laboratories. Harmonised technical procedures regarding advanced sequencing techniques and sequence data analysis will also be examined for the different targets. The above will lead to improved harmonisation of methods, e.g. for detection, normalization and bioinformatics analysis, and will help MS to set up, strengthen or expand wastewater surveillance for various priority targets. Surveys and scoping reviews will also be used to collect information on current data analysis methods used and the relevant needs of MS. An inventory of suitable statistical methods will be created and harmonised statistical tools and workflows will be developed. Demonstration examples will be designed and shared with MS. The above is expected to improve the robustness and comparability of wastewater surveillance data, which is critical for the integration of the approach into future EU and Global Sentinel Systems and Preparedness Plans. Beyond state-of-the-art: The methodologies used are the state-of-the-art in the field, and the development work will move the state-of-the-art forward. EU-WISH will assess the state of the art and the future priorities and targets of wastewater surveillance, identify, test and recommend best practices, implement capacity building, develop tools for the integration of wastewater surveillance with other surveillance methods and public health preparedness plans and establish a governance framework to ensure the financial viability and sustainability of wastewater surveillance. High quality project design and implementation by an excellent project team: The project design is tailored for the purpose, with focus on ensuring logical framework for the activities as well as high quality of support structures and challenge-solving mechanisms to ensure successful implementation. #§CON-MET-CM§# #@CON-SOR-CS@# 2.2 Consortium set-up Consortium cooperation and division of roles (if applicable) Describe the participants (Beneficiaries, Affiliated Entities and Associated Partners, if any) and explain how they will work together to implement the project. How will they bring together the necessary expertise? How will they complement each other? In what way does each of the participants contribute to the project? Show that each has a valid role and adequate resources to fulfil that role. Note: When building your consortium you should think of organisations that can help you reach objectives and solve problems. The EU-WISH consortium is large and has extensive geographical coverage across Europe: 62 institutes across 26 countries. Each participating institute brings relevant complementary expertise and experiences to the consortium. The consortium has the optimal know-how, qualifications and resources to successfully implement the project, and has demonstrated excellent collaboration during the preparation of the proposal. This action can be best carried out by this kind of consortium of the Member States’ authorities - public health authorities and those dealing with environmental surveillance - as they have the required legal and technical competences and responsibilities to implement the Union policies at national level. The consortium was built with a focus on inclusiveness and taking into account the differences by country. The participating countries and their institutes are listed below. EU-WISH is excellent for its purpose and ready for competent action. AUSTRIA, Austrian Agency for Health and Food Safety (AGES), Beneficiary 14 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 AGES is a public agency with two owners: Ministry of Social Affairs, Health, Consumer Protection and Care + Ministry of Agriculture. AGES is nominated as competent authority for wastewater surveillance. The responsibilities of AGES include to investigate, diagnose and monitor communicable diseases in Austria. We support the authorities in clarifying outbreaks of foodborne diseases and assist them in drinking water testing and bath hygiene. With the business area of Data, Statistics & Risk Assessment AGES was and is involved in several research projects and surveillance programs regarding SARS-CoV- 2 in Austria. AUSTRIA, Medical University of Innsbruck (MUI), Affiliated entity The Medical University of Innsbruck (MUI) is an educational and research institution involved in numerous international education and research programs and networks. The Institute of Legal Medicine at MUI is involved in activities related to wastewater-based epidemiology. It is the reference laboratory for SARS- CoV-2 wastewater monitoring of the Austrian Federal Ministry of Social Affairs, Health, Care and Consumer Protection. Together with AGES, it is responsible for the Austrian SARS-CoV-2 monitoring program. Furthermore, it conducts annual campaigns for monitoring of illicit drugs, pharmaceuticals and other chemicals. The Institute of Legal Medicine is an accredited laboratory (ISO 17025). AUSTRIA, Technical University of Vienna (TU WIEN), Affiliated Entity The Institute of Water Quality and Resource Management/Technical University of Vienna is experienced in wastewater surveillance. It is a permanent partner of AGES/Austria regarding knowledge transfer to Eastern European Countries (incl. Ukraine). Further the institute has in depth knowledge in sampling in aircrafts and measurement of AMR in wastewater. BELGIUM, Public health Institute Belgium, Sciensano (Sciensano), Beneficiary SCIENSANO’s mission is commitment to science and health every day. Sciensano’s strength and uniqueness lie in the holistic and multidisciplinary approach to health, focusing on the One Health concept. Sciensano represents Belgium in various international networks. Since 2020, Sciensano is coordinating the national SARS-CoV-2 wastewater surveillance in Belgium with actions ongoing to extend towards other parameters of public health importance. CROATIA, Croatian Institute of Public Health (CIPH), Beneficiary The CIPH is a central public health institute in the Republic of Croatia. CIPH’s activities include among others epidemiological surveillance, proposition and implementation of preventive and counter-epidemic measures, evaluation of the impact of environmental factors on human health. The Institute functions also as a statistical authority which maintains national public health registries, supervises data storage, and coordinates the work of other health registries. It coordinates the network of regional public health institutes, actively participates in creating health policy and public health regulations and engages in international cooperation to improve public health and welfare. Laboratories of CIPH run the national wastewater surveillance system for SARS-CoV-2 and have also some basic experiences in monitoring wastewater for polio. CIPH actively participates in several Join Actions and other European projects. CYPRUS, Medical and Public Health Services (MPHS CY), Ministry of Health Cyprus, Beneficiary The department of Medical and Public Health Services (MPHS CY) of the Ministry of Health Cyprus has a mission to promote and safeguard the health of the Cypriot population and treatment of diseases. It is the responsible governmental body for the Surveillance and Control of Communicable Diseases in Cyprus covering a wide range of activities, such as the continuous and systematic monitoring, identification, recording and prevention of mandatory notifiable diseases, and timely identification of and response for new and emerging infectious diseases. It has been the main body coordinating surveillance and intervention actions regarding the COVID-19 pandemic and participated in actions with other relevant actors regarding monitoring SARS-CoV-2 and its variants in wastewater. CYPRUS, University of Cyprus (UCY), Affiliated entity UCY is the largest public education/research institution of Cyprus. Thirteen research centres operate at the UCY committed to conducting rigorous and high-calibre research. Nireas-International Water Research Center (Nireas-IWRC) of the UCY is a water research center whose main areas of expertise are the application of wastewater-based epidemiology for the monitoring of genetic markers of pathogens of concern for environmental and public health, such as SARS-CoV-2, antibiotic resistance determinants and clinically-relevant pathogenic bacteria and their epidemiological surveillance. Furthermore, KIOS 15 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Research and Innovation Center of Excellence (KIOS CoE) of the UCY has developed the pandemic management platform, including a platform for COVID-19 wastewater surveillance (PULSE project). CYPRUS, Cyprus Institute of Neurology and Genetics (CING), Affiliated entity CING is a research and academic institution of excellence, which has the largest and most technologically developed research infrastructure in Cyprus and the neighbouring area in its field. The Department of Molecular Virology of the CING is the national reference laboratory for SARS-CoV-2 and for enteroviruses/polioviruses in Cyprus, with profound experience in clinical surveillance and characterization as well environmental surveillance of these viruses in sewages. It provides the Cyprus Ministry of Health support in public health emergencies and outbreak investigation and is a member of the Emerging Viral Diseases-Expert Laboratory Network (EVD-LabNet). CYPRUS, Water Development Department, Ministry of Agriculture, Natural Resources and Environment (WDD), Affiliated entity WDD is the responsible governmental body for water resources management. Its main responsibilities include the implementation of the National Programme of Directive 91/271/EEC regarding urban wastewater treatment, via the planning and construction of relevant wastewater collection and treatment systems, the implementation of the Sewerage Systems Law 1971-2011, and the monitoring of the operation and maintenance of wastewater treatment plants. WDD has participated in the development of a national system for monitoring SARS-CoV-2 and its variants in wastewater, through the PULSE project. CZECH REPUBLIC, Státní zdravotní ústav (SZU), Beneficiary Státní zdravotní ústav (SZU) is the Czech National Institute of Public Health established by the Ministry of Health. The SZU provides essential policy support and is an active partner in national and international research activities. Its responsibility for national wastewater surveillance for SARS-CoV-2 and polio according to the WHO highlights its crucial role in disease detection and prevention. SZU actively participates in European projects such as UNITED4Surveillance, JAMRAI, HERA, One Health EJP. CZECH REPUBLIC, University of Chemistry and Technology Prague (UCT), Affiliated entity UCT is one of the country's largest educational and research institutions focused on technical chemistry, chemical and biochemical technologies, and environmental studies. The Department of water technology and environmental engineering and the Department of Biochemistry and microbiology have a long fruitful cooperation with SZU in the field of wastewater-based epidemiology and wastewater-related microbiology. Together with SZU, UCT is a Czech leader in wastewater surveillance on the presence of SARS-CoV-2 and antibiotic resistant bacteria. DENMARK, Statens Serum Institut (SSI), Coordinator, Beneficiary SSI a public institute with responsibility for disease surveillance and preparedness for infectious threats in Denmark, is the coordinator of EU-WISH. SSI is a diagnostic, research and government advisory institute under the Danish Ministry of Health. SSI runs the Danish wastewater surveillance for SARS- CoV-2. SSI is experienced project coordinator and partner in numerous international networks and consortia related to the topic of EU-WISH: the coordinator or EU-HIP and OH4Surveillance, and a core- partner in DURABLE and in UNITED4Surveillance. ESTONIA, Health Board (HB), Beneficiary HB is government institution operating under the jurisdiction of the Ministry of Social Affairs, with activities in healthcare; infectious disease surveillance, prevention and control; environmental health; chemical safety and medical device safety. Health Board also has a laboratory of communicable diseases that provides reference laboratory service and acts as national laboratory for influenza, poliovirus, measles and rubella viruses under the accreditation of WHO. Health Boards mission is to protect and preserve the health of the population of Estonia, also to support optimal functioning of the health care system. FINLAND, Finnish Institute for Health and Welfare (THL), Beneficiary THL is a governmental research institute and a public health agency with main mission to promote health and welfare in Finland and to provide reliable, evidence-based information for the government, decision- makers and other actors in the social welfare and health sectors. THL has a longstanding and wide expertise on national wastewater surveillance for multiple pathogens, including poliovirus and SARS- CoV-2, and illicit drugs. THL also oversees infectious disease surveillance and registers in Finland, and serves as national IHR and EWRS focal point, as well as the focal point and responsible body on early warning system of EU Drug Agency (EMCDDA/EUDA). 16 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 FRANCE, Ministry of Health, Directorate-General for Health (DGS-FR) Beneficiary French Ministry of Health -Directorate-General for Health and his division for monitoring and health security (VSS) draws up the policy for the prevention, monitoring and management of risks related to emerging and re-emerging diseases and pathogens, including the infectious risks associated with healthcare, as well as the health emergency preparedness and management policy. It organizes health monitoring and vigilance systems. It coordinates their implementation by other ministerial departments, health agencies and regional health agencies. FRANCE, Santé publique France (SpFrance), Affiliated entity The national public health agency SpFrance serves the population in aspects of public health based on scientific knowledge, data and information. SpFrance has a population-based approach with the objective of reducing social health inequalities in all areas of public health: infectious diseases, non-communicable diseases, environmental health and occupational health. The agency safeguards public health through its works in epidemiological monitoring, surveillance, alert and response; and through its scientific expertise in healthcare that allows it to develop evidence-based interventions for prevention. FRANCE, The French Agency for Food, Environmental and Occupational Health & Safety (ANSES), Affiliated entity ANSES is a scientific institution active in the fields of food safety, occupational and environmental health, animal health and wellbeing, and plant health. The Agency is strongly committed to contributing to scientific expertise at the EU and international levels, through its involvement with EU Agencies and committees as well as with international scientific panels set up by organisations such as the WHO, FAO or OECD. The Agency also relies on a network of 9 reference and research laboratories which include the Anses Nancy Laboratory for Hydrology and is responsible reference laboratory for monitoring SARS- CoV-2 in wastewater and sewage sludge. The national monitoring of the SARS-CoV-2 is supported by the SUM'EAU network (microbiological surveillance of wastewater). GERMANY, Robert Koch institute (RKI), Beneficiary RKI is a federal institute subordinated to the Ministry of Health. It’s Germanys central agency for disease surveillance and prevention. Also, it performs application-based biomedical research. Its core tasks are identification, prevention and combatting of human diseases, especially infectious diseases. The RKI produces scientific guidance for health policies, e.g. of the federal ministeries, using scientific research, epidemiological and medical analysis and evaluation of diseases, especially for those of high concern, widespread or high public health importance. RKI constantly assesses and evaluates health risks and will communicate any signals of concern to the Ministery of Health. GERMANY, German Environmental Agency (UBA), Affiliated entity UBA is a federal institute subordinated to the Ministry for the Environment, Nature Conservation, Nuceal Safety and Consumer Protection. Its tasks are to ensure the health and integrity of the environment, protecting air, water and soil from pollutants the the greatest extent possible. This requires that it concerns itself with a broad spectrum of issues, e.g. waste avoidance, climate protection and pesticide approvals. To achieve that, it gathers data concerning the state of the environment, investigates relationships, conducts research in its own labs and makes projections. This knowledge is then used to provide federal bodies with policy advice. Its overarching mission is early detection of environmental risks and threats to assess them and find viable solutions in a timely manner. GREECE, ETHNIKOS ORGANISMOS DIMOSIAS YGEIAS (EODY) (National Public Health Organisation), Scientific and technical Co-coordinator, Beneficiary EODY‘s activities include epidemiological surveillance, risk assessment, scientific consultation, preparedness and response, provision of epidemiological data to authorities, education and training, and public health awareness. It is the national operational centre for planning and implementing public health protection actions and maintaining readiness to respond to emergency health risks. EODY has been the coordinator of the National Wastewater Surveillance Network for SARS-CoV-2. EODY is the scientific and technical co-coordinator of EU-WISH. It has participated in several JAs and participates in SHARP, JAMRAI-II and TERROR. GREECE, University of Thessaly (UTH), Affiliated entity The Laboratory of Hygiene and Epidemiology, Faculty of Medicine at UTH has a strong history of coordinating European projects, joint actions, service contracts and national projects. The Laboratory of Hygiene and Epidemiology is affiliated with the University General Hospital of Larissa as a cross- departmental unit and functions as Peripheral Public Health Laboratory under the National Public Health 17 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Organization of Greece (NPHO). UTH is a WHO Collaborating Centre for the International Health Regulations: points of entry (WHO Reference: GRE-27). GREECE, Aristotle University of Thessaloniki (AUTH), Affiliated entity AUTH is the largest Higher Education Institution in Greece . The Laboratory of Chemical & Environmental Technology of AUTH is a member of the wastewater surveillance network of Greece for SARS CoV-2. Ongoing research activities are focused on SARS CoV-2 variants and influenza virus monitoring mainly related to rationalization of virus load in wastewater, the prediction of unreported cases based on SARS- CoV-2 shedding rate in wastewater and the fate of SARS CoV-2 in sewage systems. GREECE, ETHNIKO KAI KAPODISTRIAKO PANEPISTIMIO ATHINON (NKUA) (National and Kapodistrian University of Athens), Affiliated entity The accredited Laboratory of Analytical Chemistry of NKUA (Trace Analysis and Mass Spectrometry group) develops and applies high-resolution mass spectrometric wide-scope target and non-target workflows, for the determination of emerging contaminants and their transformation products in the environment. NKUA is core member of the NORMAN network and the Cross-Working Group for non- target screening and has ample experience in the analysis of wastewater samples for monitoring of illicit drugs, pharmaceutical, emerging contaminants and lately, for monitoring of SARS-CoV-2. NKUA is currently working on expanding its activities to other pathogens (influenza, RSV) and AMR. GREECE, University of Patras (UPatras), Affiliated entity The University of Patras is one of Greece’s main public Universities. The Department of Public Health, in the Medical School, with the main research interests of Public Health, Epidemiology, Epidemiology of Infectious Diseases, Environmental Health, participates in several European projects. Moreover, the Public Health laboratory participates in epidemiological studies of foodborne, airborne, and waterborne epidemics as well as epidemiological studies on chronic diseases and surveillance studies, and participates in the Greek Wastewater Surveillance Network. It is an accredited laboratory for virus detection in water and food. GREECE, University of Crete (UoC), Affiliated entity The Unit of Food, Water & Environmental Microbiology (FWEM) is in the premises of the School of Medicine, University of Crete. The unit supports research protocols and studies focusing particularly but not exclusively on Environmental Microbiology, Antibiotic Resistance/Susceptibility, Typing/identification of environmental microorganisms, Epidemiology of food and water borne pathogens, Chemical analysis of environmental samples, Proteomic analysis using the MALDI-TOF MS technology and Whole Genome Sequencing of bacteria and viruses included SARS-CoV-2. GREECE, University of Ioannina (UOI), Affiliated entity The Department of Hygiene and Epidemiology (DHE) is part of the School of Medicine at UOI. DHE is one of the National Reference Centres for Environmental Microbiology, a founding member of the Cochrane Centre Greece, and one of its members holds a seat on the Panel for Contaminants in the Food Chain at EFSA. With regards to COVID-19, the Department is leading at the UOI level the COVID- 19 National Seroprevalence Study, is a partner in the National Epidemiological Study of SAR-CoV-2, is PI to the COVID-19 Sewage Ioannina Monitoring Study and holds a seat on the University of Ioannina COVID-19 Preparedness and Response Committee. HUNGARY, Nemzeti Népegészségügyi Központ (NNK), Beneficiary NNK functions as a central authority under the direction of the Minister responsible for public health. NNK performs managing, coordinating, and supervising activities related to public health, epidemiology, health development (health protection, health education, health promotion), and public health administration, as well as supervision of healthcare provision; furthermore on the basis of delegated competence NNK carries out tasks and duties relating to occupational health (workplace hygiene, occupational medicine), exercises and executes private law rights and duties in the field of occupational health. IRELAND, Health Protection Surveillance Centre (HSE), Beneficiary HPSC is Ireland's national competent body for the surveillance of communicable diseases. HPSC is part of the Health Service Executive and strives to protect and improve the health of the Irish population by providing timely information and independent advice, and by carrying out disease surveillance, epidemiological investigation and related research and training. HPSC coordinates the surveillance of approximately 100 notifiable diseases in Ireland, and is a founding partner of the National Wastewater 18 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Surveillance Programme, which has undertaken SARS-CoV-2 wastewater surveillance since May 2021, and PV2 surveillance since February 2023. IRELAND, University College Dublin (UCD), Affiliated Entity UCD is one of Europe's leading research-intensive universities. UCD is home to the National Wastewater Surveillance Laboratory, which carries out wastewater surveillance on behalf of the Health Service Executive in collaboration with the Health Protection Surveillance Centre, the Health Service Executive, the National Virus Reference Laboratory and Uisce Éireann (Irish Water). The National Wastewater Surveillance Programme monitors SARS-CoV-2 and variants. In addition, a range of other viral pathogens are monitored as well as illicit drugs. UCD is also home to the National Virus Reference Laboratory (NVRL), which provides a diagnostic and reference service and is accredited by the Irish National Accreditation Board (INAB). It is noted that the personnel rates in Annex 1 have been calculated in accordance with the University’s internal rules and actual salaries. Evidence may be provided upon request during the project’s implementation. IRELAND, Uisce Éireann (UÉ), Affiliated Entity Incorporated in July 2013 as a company under the Water Services Act 2013, Irish Water, now known as Uisce Éireann (UÉ), brought water and wastewater services of the 31 local authorities together under one national service provider. UÉ is responsible for the operation of all public water and wastewater services including: Management of national water and wastewater assets; Maintenance of the water and wastewater system; Investment and planning; Managing capital projects; and Customer care and billing, as well as for all of the capital investment decisions and implementation of the capital programme delivery across the country. ITALY, Istituto Superiore di Sanità – National Health Institute (ISS), Beneficiary ISS is the main centre for research, control and scientific advice on public health in Italy. ISS cooperates with the Ministry of Health, the Italian Regions and the whole National Health Service in the field of prevention and health promotion. ISS has been involved in international and European research projects for several years, as both partner and leader, and is currently involved in the Joint Actions United4Surveillance and EU-JAMRAI2, in the INF-ACT project (NextGenerationEU), and in the Direct Grant EcoSurv (cross-border pathogens). ISS hosts departments working on human, animal, and environmental health, with a strong vocation towards a One Health approach. Working on environmental surveillance of infectious diseases and wastewater-based epidemiology since the early 2000’s, in 2021 the ISS has been assigned the coordination of SARS-CoV-2 surveillance in wastewater. ITALY, Ministero della Salute – Italian Ministry of Health (IT MOH), Affiliated Entity IT MOH was established in 1958 to implement the provisions of art. 32 of the Italian Constitution: "The Republic protects health as a fundamental right of the individual and in the interest of the community”. IT MOH exercises functions on coordination of the national health system, and protection of human, occupational and veterinary health. IT MOH participation in this JA will ensure compliance to the national strategic objectives for surveillances and institutional interaction with international health organizations. ITALY, Fondazione Bruno Kessler (FBK), Affiliated Entity FBK is a private non-profit organization with the Province of Trento (Italy) as the only stakeholder. Its Center for Health Emergencies, a unit with 25 years of experience in modelling of infectious diseases, is active in computational epidemiology (estimation of risk factors for infection/disease, mathematical models for transmission dynamics, evaluation of the effectiveness of interventions). FBK has been involved in several EU-funded projects on infectious disease modelling (Healthy Sailing, VERDI, FLUMODCONT) and surveillance (MOOD, VESTEC, CIMPLEX, EPIWORK, INF-ACT). ITALY, Regione Lombardia – Region Lombardy, General Directorate for Welfare (RLDGW), Affiliated Entity Region Lombardy is the largest administrative region in Italy. First area in Italy affected by the COVID-19 pandemic, it early recognized the value of wastewater monitoring for epidemiological surveillance, establishing a regional network of laboratories (UniMI-Bicocca, UniMI-Statale, IZS-LER, Istituto Mario Negri, Polytechnic of Milan) on different aspects of wastewater surveillance (AMR, polio, drugs of abuse, etc). RLDGW will contribute to the technical aspects of monitoring as well as on the assessment of the governance requirements to establish wastewater surveillance and to ensure its sustainability. LATVIA, Centre of Disease Prevention and Control (CDPC), Beneficiary CDPC is an institution of direct administration under subordination of the Ministry of Health and has the main role in public health system of Latvia. Aim of CDPC is implement the public health policy, epidemiological safety and disease prevention (incl., surveillance, monitoring and intelligence – predicting 19 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 and evaluating the dynamics of the spread of infectious diseases (incl., SARS-CoV-2)), health care policy, as well as to ensure the implementation and coordination of the health promotion and disease prevention policy, population based public health surveys etc. LATVIA, Institute of Food Safety, Animal Health and Environment "BIOR" (BIOR), Affiliated entity BIOR is a multidirectional scientific institution with a strong background in integrated research in the fields of public health and animal health, food and environmental safety. BIOR provides science and policy feedback to relevant MInistries. BIOR is a leading institution among the Baltic States in terms of laboratory capacity and advanced instrumentation in areas of molecular biology (NGS) and organic mass spectrometry. It plays a leading role in resolving National level crises regarding animal disease outbreaks and environmental contamination cases, as well as in national wastewater monitoring (incl., identification of the presence of SARS-CoV-2 and prediction of outbreaks). LATVIA, Latvian Biomedical Research and Study Centre (LBMC), Affiliated entity LBMC is the leading scientific institute in molecular biology, biomedicine and biotechnology in Latvia. It is a scientific centre performing basic as well as applied research in molecular genetics, genomics and proteomics, immunology, biotechnology, and other scientific areas. The LBMC staff has accumulated considerable experience in the development of new methods for processing and detecting nucleic acid- containing samples and has access to all the necessary infrastructure and research technologies. LMBC is a member of a major SARS-CoV-2 genetic surveillance task force (incl., wastewater monitoring) and provides full genome sequencing of the virus found in patient samples. LITHUANIA, National Public Health Centre under the Ministry of Health (NVSC-LT), Beneficiary NVSC-LT is an institution that e.g. implements state public health policy and consumer rights protection, evaluates and controls the potential risks of services, products, environmental factors and communicable diseases, carries out surveillance of communicable diseases, draws up public health emergency preparedness and management plans, and organizes and evaluates data of wastewater surveillance for SARS-CoV-2. NVSC-LT has a central unit and 10 departments located in 10 counties of Lithuania and carries out activities in all municipalities. LITHUANIA, National Public Health Surveillance Laboratory (NVSPL-LT), Affiliated entity NVSPL-LT carries out chemical and microbiological tests of outdoor and indoor air, sewage, bathing and drinking water, food, non-food products, cosmetics, personal hygiene products, materials and products intended to come into contact with food, biocides, detergents, household chemical products and other. The laboratory performs microbiological, virological, parasitological, immunological, immunoenzymatic, serological, hematological, molecular, general clinical and other clinical-diagnostic tests required for personal and public health care. LUXEMBOURG, Luxembourg Institute of Science and Technology (LIST), Beneficiary The Luxembourg Institute of Science and Technology (LIST) is a mission-driven Research and Technology Organisation (RTO) that develops competitive and market-oriented product/service prototypes for public and private stakeholders. LIST has developed and implemented a wastewater- based epidemiological (WBE) surveillance of SARS-CoV-2 during the onset of the pandemics in Europe. Since then, LIST has further developed WBE in order to include other pathogens and to deal with antimicrobial resistance. The National WBE Observatory (MicrObs) is currently run by LIST. It is noted that the personnel rates in Annex 1 have been calculated in accordance with the Institute’s internal rules and actual salaries. Evidence may be provided upon request during the project’s implementation. LUXEMBOURG, Laboratoire National de Santé (LNS), Affiliated entity LNS is a public establishment operating under the supervision of the Ministry of Health in Luxembourg. It is organised as a multidisciplinary institute which comprises a microbiology department which will be active in the present project. It is noted that the personnel rates in Annex 1 have been calculated in accordance with the Institute’s internal rules and actual salaries. Evidence may be provided upon request during the project’s implementation. MALTA, Infectious Disease Prevention and Control Unit (IDCU), Beneficiary The Infectious Disease Prevention and Control Unit (IDCU), which falls under the remit of the Health Promotion and Disease Prevention Directorate (HPDPD) is the national centre responsible for the surveillance, prevention, and control of infectious diseases in the Maltese islands. The IDCU has experience in various EU-funded projects including the Joint Actions UNITED4Surveillance and COVID- 19 wastewater Testing and Surveillance. NETHERLANDS, Rijksinstituut voor Volkgezondheid en Milieu (RIVM), Beneficiary 20 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 RIVM is the Dutch National Institute for Public Health and the Environment, a governmental research and knowledge institute providing policy support. RIVM performs tasks to safeguard and promote public health and environmental quality, including addressing infectious diseases. The Laboratory for Zoonoses and Environmental Microbiology runs the national wastewater surveillance system for SARS-CoV-2, but also has experience in monitoring wastewater for AMR, polio, Mpox, medicine residues, and currently investigating future opportunities for wastewater monitoring. RIVM is the coordinator of UNITED4surveillance, and actively participates in many other European projects, such as DURABLE, EU-HIP and JAMRAI-II. NORWAY, Norwegian Institute of Public Health (NIPH), Beneficiary NIPH is a government agency under the Ministry of Health and Care Services focusing on provide knowledge, preparedness and infrastructure to protect life and improve public health, both in Norway and globally. According to the Infectious Disease Act, NIPH is responsible for infectious disease surveillance in Norway where it manages several national registries covering infectious diseases, vaccinations, and antimicrobial resistance, and reports internationally, mainly to WHO and ECDC. It is noted that the personnel rates in Annex 1 have been calculated in accordance with the Institute’s internal rules and actual salaries. Evidence may be provided upon request during the project’s implementation. NORWAY, Norwegian Veterinary Institute (NVI), Affiliated entity NVI is a public research institute, under the ownership of the Ministry of Agriculture and Food. NVI’s most important function is preparedness and development of expertise related to preventing and reducing threats to the health of fish, animals, and humans. In EU-WISH, NVI will share the knowledge and experience on AMR, emerging pathogens (i.e., zoonotic disease), chemicals and metagenomics. PORTUGAL, National Institute of Health Doutor Ricardo Jorge (INSA), Beneficiary INSA is a State Laboratory of the health sector, providing the Ministry of Health with data for knowledge- based decision-making. The infrastructure for this project includes core laboratories from the Department of Environmental Health (DEH) - dedicated to the research and surveillance of AMR in clinical and environmental settings and involved in the evaluation of microbiological parameters in hospital wastewaters; and the Department of Infectious Diseases (DID) - through the NRL in AMR and Health Associated Infections (NRL-AMR/HAI) and the Genomics and Bioinformatics Unit, responsible for monitoring the integrity and genetic evolution of SARS-CoV-2 during infection, to support genome-based surveillance and outbreak investigation activities in Portugal. PORTUGAL, Directorate-General of Health (DGS), Affiliated entity DGS is a public body of the Ministry of Health, a national reference in the healthcare field. DGS developed the environmental module on the SINAVE (National Epidemiological Surveillance System) - SINAVEamb, which allows the collection and sharing of data on monitoring wastewater and the issuance of early warnings to the Health Authorities, ensuring the interoperability of SINAVE and APA (Portuguese Environment Agency) platforms, and their connection to the European Commission platform (DEEP). PORTUGAL, AdP VALOR, Affiliated entity AdP VALOR is the company within the Águas de Portugal Group (AdP Group), responsible to centralize a set of services and competences including as R&D and innovation activities. AdP Group specialises in the integrated management of the urban water cycle, including abstraction, distribution, collection, transport, treatment and disposal of urban and industrial wastewaters. The Group is responsible for the management of several thousand WTP and WWTP infrastructures .AdP VALOR lead and participated in several projects and initiatives such as COVIDETECT, SARSCONTROL and the Nationwide Surveillance System of SARS-CoV-2 and its variants in wastewater. PORTUGAL, Portuguese Environment Agency (APA), Associated Partner APA is a public agency belonging to the Ministry of Environment and Climate Action. APA is the State agency whose mission is the integrated management of environmental and sustainability policies. The responsibilities of APA are monitoring, planning and evaluating, licensing and inspection, and is therefore the main environmental regulator in Portugal. Regarding the definition of surveillance strategies and governance framework, the ongoing EU Sewer Sentinel System for SARS-CoV-2 (which led to the creation of the national surveillance system for SARS-CoV-2 and its variants in wastewater), is being coordinated by DGS and the Portuguese Environment Agency - APA). PORTUGAL, Airports of Portugal (ANA), Associated Partner 21 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 ANA is the company responsible for managing 10 airports in Portugal. They will collaborate in the sampling activities of aircrafts/airports in Portugal. ROMANIA, National Institute of Public Health (INSP), Beneficiary INSP is a public institution, subordinated to the Ministry of Health. INSP implements national health programs and coordinates disease prevention activities, control of communicable and non-communicable diseases, and health policies; provides technical assistance, expertise, and methodological guidance; performs public health services; monitors the health of the population and identifies public health problems; ensures the epidemiological surveillance system, as well as early warning and rapid response and participates in information exchange. SLOVENIA, National Institute of Public Health (NIJZ), Beneficiary NIJZ is the central Slovene institution for public health practice, research and education. Its academic staff work on epidemiology of communicable and non-communicable diseases, health promotion, health protection, health system research and coordination of preventive programmes in primary health care. NIJZ provides research in the field of health, and protects and increases the level of health of the population by raising the awareness of population and carrying out other preventive measures. NIJZ currently participates in over 75 Slovene and EU-funded projects and has a coordinator’s role in 6 prominent EU-funded Joint Actions (EPAAC, PARENT CanCon, Best ReMaP, iPAAC and CraNE). SLOVENIA, National Laboratory of Health, Environment and Food (NLZOH), Affiliated entity NLZOH is a public health institute, established under the Decision of the Government of the Republic of Slovenia on Establishing the National Laboratory of Health, Environment and Food. NLZOH is one of the two public health authorities, covering hygienic and ecological health activities, environment protection problems, microbiological, professional health and research activities, and chemical and microbiological analyses of various samples and provides support to the Ministries. NLZOH cooperates in national and international projects. NLZOH's duties are stated in Article 23c of the Health Care Law. SPAIN, Instituto de Salud Carlos III (ISCIII), Beneficiary ISCIII is the main public research entity funding, managing, carrying out biomedical research and providing key services in the life and health sciences. It is responsible for managing Spain's Health Research and Development Strategy. It includes centres such as the National Centre for Microbiology (CNM), the National Centre for Epidemiology (CNE), the National Centre for Environmental Health (CNSA) and different Units, among them the Bioinformatic Unit (BU), all of which can support EU-WISH. BU-ISCIII plays an essential role in the application and development of WGS in the diagnostic, research and public health activities performed by the Reference Laboratories of the ISCIII. SPAIN, Agencia Española de Medicamentos y Productos Sanitarios (AEMPS), Affiliated entity AEMPS is attached to the Ministry of Health responsible for guaranteeing the quality, safety, efficacy and correct information of medicines and medical devices for protection and promotion of human health, animal health and environment. It coordinates the Spanish National Action Plan on Antimicrobial Resistance (NAP-AMR). AEMPS is connected with other European and international organizations and initiatives that address AMR (I.e., AMR One Health Network). AEMPS is also part of EU-JAMRAI 2. SPAIN, Universidad de Barcelona (UB), Affiliated entity UB is a nationally (Ministry of Education) and internationally (EC) acclaimed academic institute of excellence. The Enteric Virus Laboratory of UB (RMP) is devoted to the study of human entericviruses as norovirus, sapovirus, astrovirus, rotavirus and hepatitis A virus. Since the Covid-19 pandemic RMP has co-led,, projects from the Spanish Ministry for the Ecological Transition and Demographic Challenge and the Spanish Ministry of Health for the quantification and NGS characterization of SARS-CoV-2 genomes in 78 wastewater treatment plants. SPAIN, Universidad de Santiago de Compostela (USC), Affiliated entity USC is an institution ranked in the top-10 of Spanish universities. During the period 2014-2020, R&D activities were supported with an average of €60 million/year, including over 200 collaborative and individual actions within H2020. The team involved in this project coordinates the Spanish network of wastewater-based epidemiology ESAR-Net. SPAIN, Universidad de Salamanca (USAL), Affiliated entity 22 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 USAL is the oldest university in Spain and one of the oldest in the world. Research is carried out mainly in renowned research groups that have more than 100 members and belong to all scientific fields. The team participates in the Spanish network of wastewater-based epidemiology ESAR-Net. SPAIN, Centro de Coordinación de Alertas y Emergencias (CCAES), Associated Partner (to be confirmed, not added to participant list at proposal submission stage) The Health Alerts and Emergencies Coordination Center, is a Center dependent on the General Directorate of Public Health, Quality and Innovation (DGSPCI) of the Ministry of Health, Social Services and Equality to coordinate information management and support the response to national or international health alert or emergency situations. To this end, the National Early Warning and Rapid Response System (SIAPR) has been created. The CCAES is the unit responsible for drawing up and developing preparedness and response plans to deal with public health threats. SWEDEN, Public Health Agency of Sweden (PHAS), Beneficiary PHAS has a national responsibility for public health issues and works to ensure good public health. The agency also works to ensure that the population is protected against communicable diseases and other health threats. At PHAS, evaluation of wastewater surveillance for SARS-CoV-2 as a complement to patient sampling is ongoing since 2022. The aim is to develop expertise within the field and to integrate wastewater surveillance into public health surveillance. We are also considering expanding wastewater surveillance to other pathogens, such as influenza and polio. PHAS is part of several European projects, such as UNITED4Surveillance, OH4Surveillance, EU-HIP and JAMRAI-II. SWEDEN, Swedish University of Agricultural Sciences (SLU), Affiliated entity Department of Aquatic Sciences and Assessment: Their research, education and environmental monitoring and assessment is focused on bettering our understanding of environmental changes of inland surface waters, as well as analyses of the underlying causes of any changes. Their research includes environmental pollutants, biodiversity, and ecosystem services. Their accredited laboratories analyze water chemistry, pesticides and biota in lakes and streams. They are also national datahosts for waterchemistry and biological data from lakes and watercourses. Their team have performed wastewater surveillance in Sweden since 2020. UKRAINE, State institution "Public Health Center of the Ministry of Health of Ukraine (UPHC), Beneficiary UPHC is responsible for controlling the sanitary and epidemic situation in the country, preventing diseases, fighting against epidemics, increasing life expectancy, and improving the health of citizens. UPHC conducts research on wastewater samples in Ukraine within the framework of epidemiological surveillance of infectious diseases, in particular, poliomyelitis and cholera agents. Virological laboratories of regional disease control centers study the circulation of enteroviruses, including polioviruses and the causative agent of cholera among the population. Also, as part of the PATH pilot project, UPHC has implemented testing of wastewater for the presence of SARS-CoV-2. 2.3 Project teams, staff and experts Project teams and staff Describe the project teams and how they will work together to implement the project. List the staff included in the project budget (budget category A) by function/profile (e.g. project manager, senior expert/, junior expert, trainers/teachers, technical personnel, administrative personnel etc. — use the same profiles as in the detailed budget table, if any) and describe briefly their tasks. Provide CVs of all key actors (if required). Name and Organisation Role/tasks/professional profile and expertise function Steen Ethelberg, SSI Head of Section of Food & Waterborne and Zoonotic Infections. project Professor at University of Copenhagen. Experienced in coordinator surveillance, outbreak investigations and epidemiological research. Was involved in setting up wastewater surveillance for SARS-CoV-2 in Denmark. Coordinator and WP6 leader. 23 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Pikka SSI Head of Section, Leader of Secretariat for Infectious Disease Jokelainen, Preparedness. DVM, PhD. Coordinator of OH4Surveillance and project EU-HIP, and WP-co-leader in DURABLE and One Health EJP. coordinator Experienced in science-to-policy approaches and One Health. Coordinator and WP1-leader. Jos van Vlerken, SSI Project Manager in the SSI Secretariat for Infectious Disease project manager Preparedness, with project manager role also in EU-HIP for supporting countries to enhance and improve national IT systems in an efficient and coordinated manner, with the objective of obtaining interoperability with HERA’s IT platform. Kristina Træholt SSI Head of Section of Virus Surveillance and Research. PhD, Franck, senior Specialist in Clinical Microbiology, sub-specialization in Clinical expert Virology. Coordinated the initial implementation of wastewater SARS-CoV-2 surveillance in Denmark, responsible for sequencing of SARS-CoV-2 from wastewater. Involved in WP7. Lene Wulff SSI Epidemiologist in the Section of Food & Waterborne and Zoonotic Krogsgaard, Infections. Project leader of the Danish wastewater surveillance senior expert team. Arieh S. Cohen, SSI PhD in analytical chemistry. Head of RnD section at Test Center senior expert Denmark. Leads the team that developed and implemented the SARS-CoV-2 wastewater screening assay currently used in the Danish surveillance program. Other: senior SSI Including the persons named above, the team at SSI is a strong and junior team with optimal complementary expertise and experiences for experts, the work. In addition to high-level expertise in core aspects of the technical and call, the team is strong in administrative and supportive functions administrative as well as communication and dissemination. The team is personnel experienced in coordinating large projects. Anastasia EODY Head of EODY’s Environmental Health Office. Experienced in Koutsolioutsou, Molecular Microbiology and Environmental Health. Initiator and scientific and coordinator of the National Wastewater Surveillance Network for technical the monitoring of SARS-CoV-2 in urban wastewater. National coordinator Contact Point and active participant of EU4S. Initiator and coordinator of EODY’s effort to create a National Environmental Health Observatory. External consultant for the EC’s LIFE program. Scientific and technical cCo-coordinator of EU-WISH. Other: senior EODY Including the key persons named above, the team at EODY and junior together with the teams of its affiliated entities, which are all experts, members of the National Wastewater Surveillance Network, is a technical and strong team with optimal complementary expertise and experience administrative in the fields required for the execution of the work. personnel Elisabete INSA Conducts research on water and sand quality, focused on the Valério, Junior search and evaluation of the effects of biological contaminants Scientist (bacteria, viruses and cyanotoxins) at INSA (“Portuguese NIH”) with the main purpose of safeguarding human health. João Paulo INSA Works in the field of microbial genomics and is the Head of the Gomes, Senior Research Unit of the Department of Infectious Diseases and the Scientist Head of the Genomics and Bioinformatics Unit at INSA. Manuela Caniça, INSA Head of the National Reference Laboratory of Antibiotic Resistance Senior Scientist and Healthcare Associated Infections (NRL-AR/HAI), from Health R&D and Reference Units of the Department of Infectious 24 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Diseases, at National Institute of Health Doutor Ricardo Jorge (INSA). Pedro Pinto DGS Director of the Directorate of Information and Analysis, Directorate- Leite General of Health DGS Tiago Ferrão AdP Valor Innovation Director AdP VALOR, Grupo Águas de Portugal Willemijn RIVM Currently working as a senior environmental scientist, at Lodder, Senior Wastewater Surveillance Department, with many years of Scientist experience at RIVM; Researcher Environmental Microbiology. Work package leader for WP7. Heike Schmitt, RIVM Vast expertise in national and international environmental Senior scientist surveillance Involved in AMR topics in WP5 and WP7. Jerome Lock- RIVM Works as a scientist in infectious diseases, WASH, and Biosecurity. Wah-Hoon, He has 10 years’ experience in laboratory medicine, project scientist management, research, and consultancy. He is specialised in laboratory preparedness and response to high-threat pathogens, including COVID-19, with a focus on environmental surveillance and WASH programmes. Erwin RIVM Works as a senior researcher in wastewater-based epidemiology Nagelkerke, with specialities as a senior statistician, analysis and dissemination senior of WBE results and programming automated data reporting tools, researcher Previously, he worked as University Researcher and Lecturer in statistics and data science. Other: senior RIVM Including the key persons named above, the team at RIVM is a and junior strong team with optimal complementary expertise and experts, experiences for the work. There will be many staff from different technical and departments in RIVM involved in the different aspects of work. administrative personnel Tarja Pitkänen, THL Assoc. Prof. Pitkänen, Chief Specialist in Water Microbiology project manager Laboratory, leads the Finnish wastewater-based surveillance for SARS-CoV-2 and its variants and develops the wastewater surveillance program towards monitoring of multiple pathogens and AMR. She leads WP5 in EU-WISH. Tuija Leino, THL Chief Physician, MD, Dr. Leino is Assist. Prof. of infectious disease senior expert epidemiology, and responsible head for register based infectious disease surveillance in Finland. WP leader in the Joint Action of Integrated surveillance (United4Surveillance). Carita THL Head of the Expert Microbiology Unit with 25 years’ experience in Savolainen- virology and infectious diseases. Dr. Savolainen-Kopra is in charge Kopra, senior of national laboratory-based surveillance of infectious diseases. expert Teemu Gunnar, THL Head of the Forensic Chemistry Unit, lead of the nationwide project manager wastewater-based surveillance for illicit drugs with experience of consulting various countries and presented as keynote speaker in international conferences on the aspects of wastewater surveillance. He leads/co-leads tasks in WP5 and WP7. Other staff: THL THL team consists of experts in environmental microbiology, senior experts, molecular biology and bioinformatics, AMR surveillance, junior experts toxicology, biomarkers, chemical analysis, statisticians in the infection epidemiology and surveillance, virologists specialized on 25 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 and technical influenza, poliovirus and enterovirus surveillance and personnel personnel. for supportive functions. Veronik Hutse, SCIENSANO Currently working as senior scientist on COVID-19 wastewater Senior Scientist surveillance, with almost 20 years of experience as virologist in human diagnostics. Co-leader WP7, involved in WP2, WP3, WP4, WP5, WP6 and WP7 in EU-WISH. Marie SCIENSANO Head of COVID-19 wastewater surveillance at Sciensano, the Lesenfants Belgian public health institute, in Epidemiology of infectious diseases Service. Advisor for Polio wastewater surveillance. Background in chemical bioengineering, water treatment and environment, with more than 10 years' work experience. Having worked as an expert in Environment/Water, for developing countries. She is involved in WP3, WP5 and WP7 and has the lead in WP 5.5 and part of 7.2. Koenraad Van SCIENSANO Head of the service Foodborne pathogens at Sciensano. He and Hoorde his team monitor food safety and contribute to public health policy by an active role in the EU network of national reference laboratories. He leads the laboratorium consortium performing SARS-CoV-2 surveillance in wastewater and is involved in setting up initiatives to extend wastewater surveillance to other microbiological public health parameters such as other pathogens and AMR. He’s mainly involved in WP5, and in WP7 as co-lead. Nancy Roosens SCIENSANO Nancy Roosens is head of the service Transversal activities in Applied Genomics within Sciensano. She is the coordinator of several research projects including the development of molecular biology methods (ddPCR and NGS) and its (bioinformatic) analysis for the detection of SARS-CoV-2 in wastewater. She will be mainly involved in WP7 and co-lead in task 7.3.2 Laura Van SCIENSANO Laura Van Poelvoorde is part of the service Transversal activities Poelvoorde, in Applied Genomics within Sciensano. She is involved in the junior expert development of molecular biology methods (ddPCR and NGS) and its (bioinformatic) analysis for the detection of SARS-CoV-2 in wastewater. Involved in WP7 and lead in task 7.3.2 Lies Gremeaux SCIENSANO Head of unit Illicit drugs. Drug expert and head of the Reitox national focal point for the European Drug Agency. For the past 10 years involved in the drug-related developments on wastewater- based epidemiology, both through the collaborations with the national SCORE research group as well as the coordination of the annual European multi-city wastewater study. She will be involved in WP5 subtask 5.7 and 7.2.5. Other: senior SCIENSANO Including the key persons named above, the team at Sciensano is and junior a strong team with optimal complementary expertise and experts experiences for the work. There will be many staff from different technical and departments in Sciensano involved in the different aspects of administrative work. personnel Jose Antonio NIPH Jose Antonio Baz Lomba works as senior advisor at the department Baz Lomba, of infection control and preparedness at NIPH. PhD in analytical Senior expert chemistry applied in the field of wastewater-based epidemiology, he is part of the Norwegian wastewater surveillance team at NIPH and member of the SCORE Network core team. He leads WP4 in EU-WISH. Elisabeth Henie NIPH Elisabeth Henie Madslien (DVM, PhD) has broad experience within Madslien, project management and research within the fields of cross- Senior expert sectoral health preparedness (CBRN), microbial detection/ 26 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 identification and surveillance. She leads the Norwegian COVID- 19 wastewater surveillance program. Ettore Amato, NIPH PhD in Public Health and graduated under the ECDC Senior expert EPIET/EUPHEM Programme. Experienced in public health surveillance, research and outbreak investigation. He substantially contributed in setting up the pilot wastewater surveillance and its evaluation in Norway. He represents the Norwegian delegation for the WHO Protocol Water and Health, Programme Area 2 which include wastewater surveillance. Karoline NIPH Karoline Bragstad, head of Influenza and other respiratory viruses Bragstad, Senior section at NIPH, PhD and senior scientist. Leading virological expert surveillance for near 15 years and working for public heath surveillance for near 20 years. Responsible for the virus variant detections in the Norwegian wastewater surveillance system with whole genome sequence analysis. Other: senior NIPH Including the key persons named above, the team at NIPH is a and junior strong team with optimal complementary expertise and experts experiences for the work. There will be many staff from different technical and departments in NIPH involved in the different aspects of work. administrative personnel Hannah Joan NVI Senior Scientist, Dr. Med. Vet, food and terrestrial bacteriology, Jørgensen, coordinator of NVI work within zoonotic diseases and One Health. Senior Scientist Anne Margrete NVI Senior Scientist, Dr. Med. Vet. leading the AMR surveillance in Urdahl, Senior veterinary sector, and coordinating activities on AMR at NVI. Long Scientist experience working with zoonoses and One Health. Gunnar NVI Senior Scientist, with responsibility for chemical analyses, Sundstøl toxicology, mycotoxins and risk assessment (including previous Eriksen, Senior risk assessments of wastewater). Scientist Other staff: NVI Including the key persons named above, the team at NVI is a senior and junior strong team with optimal complementary expertise and experts, experiences for the work. There will be many staff from different technical and departments at NVI involved in the different aspects of work. administrative personnel. Ana Cañas, ISCIII Ana Cañas is Director of the National Center for Environmental senior expert Health in Spain. PhD in environmental sciences with a background in environmental toxicology. Experience in monitoring of chemicals (chemical quality) in environmental matrices (air, water, soil) and in large-scale European projects in the field of human biomonitoring and risks from chemical substances. Main project manager in Spain of the European Partnership for the assessment of risks from chemicals (PARC). Other staff: ISCIII Besides the key person named above, ISCIII team will include senior and junior several other researchers with complementary expertise and experts, experience (molecular biologists, microbiologist, bioinformaticians, administrative epidemiologists, chemists, IT specialists, etc.) from different personnel departments/centres of ISCIII. 27 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Ricardo AEMPS Ricardo Carapeto is a veterinarian, Chair of the ERA Carapeto, senior (Enviromental Risk Assessment) Working Party of the Committee expert of Veterinary Medicinal Products (CVMP) of the European Medicines Agency (EMA). He has taught in training activities such as BTSF on the environmental aspects of AMR. Coordinator of the NAP-AMR in the environmental area. Amparo Haro, AEMPS Amparo Haro (PhD) is a molecular biologist by training and expert senior expert in the ERA for diverse kinds of chemicals at the AEMPS and is part of the NAP-AMR in the environmental area. Rosa M. Pintó, UB Professor Rosa M Pintó is the IP of the Enteric Virus Laboratory senior expert of the University of Barcelona, with a long history of research on Environmental Virology and particularly on wastewater based Epidemiology (WBE) coleading projects from the Spanish Ministry for the Ecological Transition and Demographic Challenge (MITERD; VATaR COVID-19) and the Spanish Ministry of Health (MISAN; HEBAR). Background also in surveillance of Enteroviruses, including poliovirus, in some of the WWTPs sampled in the VATaR and SARSAigua. José Benito USC Dr. Quintana is an associate professor at the the Institute for Quintana, senior research on Chemical and Biological Analysis in the University of expert Santiago de Compostela. He coordinates the Spanish Network ESAR-Net (www.esarnet.es) on WBE and the WP on drug use indicators at the Spanish RIAPAd Network (https://riapad.es/). He has a strong record of publications (>140), including many on WBE on illicit drugs, alcohol, tobacco, pharmaceuticals and environmental contaminants, among others Rosario Rodil, USC Dr. Rodil is an associate professor at the the Institute for research senior expert on Chemical and Biological Analysis in the University of Santiago de Compostela. She also participates in the ESAR-Net and RIAPAd networks. She has a strong record of publications (>130), including many on WBE and is now an Editor of the Journal of Environmental Chemical Engineering, in particular to develop the editorial line on “wastewater surveillance”. Rosa Montes, USC Rosa Montes (PhD) is a senior researcher at the Institute for senior expert research on Chemical and Biological Analysis in the University of Santiago de Compostela. She has solid expertise in the analysis of drugs, pharmaceuticals and other emerging contaminants in wastewater and its application in wastewater-based epidemiology (WBE). She is member of the Spanish network ESAR-Net focused on the monitoring of drugs consumption in Spain through wastewater analysis, as well as the RIAPAd network, including integrating WBE with other drug use indicators. Other staff: USC Other junior experts from USC, including PhD students, postdocs, senior and junior research assistants, as well as administrative staff will support the experts, work performed at USC. administrative personnel Neus Latorre- PHAS Neus Latorre-Margalef is a senior expert microbiologist, PhD. Margalef, senior Team leader for the microbiological surveillance of influenza and expert SARS-CoV-2 variants and works actively with the epidemiology team at PHAS. Since 2022 she is involved in setting up the microbiological surveillance of SARS-CoV-2 variants in wastewater. She has broad experience in international collaborations within One Health and EU-funded projects. Anna Ohlson , PHAS Anna Ohlson is a veterinarian, PhD in veterinary epidemiology. senior expert Working as an epidemiologist at the Unit for Coordination and 28 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Surveillance of Seasonal Viruses, with a focus on data and epidemiological analysis of covid-19. Rakel Brodin, PHAS Rakel Brodin, master in epidemiology. Working as an senior expert epidemiologist at the Unit for Coordination and Surveillance of Seasonal Viruses, with a focus on data and epidemiological analysis of covid-19. Helene Botnen, PHAS Analyst at the Unit for zoonoses and antibiotic resistance at PHAS senior expert working mainly with wastewater surveillance. Has a background in ecology and environmental science. MSc in ecosystem management. Carlo Berg, PHAS Bioinformatician, PhD in microbiology with a background in senior expert environmental microbial ecology. Experience in large-scale data analysis and management of high throughput sequencing data. Main project manager of the national project and database GENSAM involving collection, storage and analysis of SARS-CoV- 2 sequencing data from clinical samples on the national level. Cristina Moretti PHAS Senior financial controller who actively work with EU funded Somp, projects. Controls all the eligible cost in accordance to the EU rules administrative and regulations. In charge of budgets and reports. Many years personnel working in the governmental sector. Bachelor's degree in Accounting. Other staff: PHAS Including the key persons named above, the team at PHAS is a senior and junior strong team with optimal complementary expertise and experts experiences for the work. There will be several staff from different technical and departments in PHAS involved in the different aspects of work. administrative personnel. Anna Székely SLU Associate Professor in Biology with a focus on Limnology. The overarching theme of her research career has been aquatic microbial ecology. She initiated the measurement of SARS-CoV-2 in the wastewater of Uppsala in 2020. Marta Kořínková SZU Marta Kořínková is a microbiologist at Centre for Health and the junior expert Environment – laboratory for soil and waste hygiene. She is involved in setting up national wastewater surveillance of SARS- CoV-2, including molecular biology methods. She has experience with culture techniques for phenotypically resistant bacteria isolation from environmental samples. Helena Jiřincová SZU Helena Jiřincová is an expert in respiratory and emerging viruses senior expert in association with public health. She has broad experience with the use of NGS and bioinformatics. She has skills as team leader of national reference laboratory. She has broad experience in international collaborations within EU-funded projects. Other staff: SZU Including the key persons named above, the team at SZU is a senior and junior valuable team with optimal complementary expertise and experts technical experiences for the work. There will be many staff from different and departments in SZU involved in the different aspects of work. administrative personnel Jan Bartáček UCT Jan Bartacek is an expert in wastewater technology (wastewater senior expert treatment and resource recovery) and wastewater-based epidemiology and in the last 4 years, he specializes on the presence of antibiotic resistant genes in wastewater. He is 29 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 experienced in the coordination of both national and international research projects. Other: senior UCT The team of UCT Prague includes both senior and junior and junior researchers from the field of environmental microbiology, virology, experts and environmental biotechnology in general and biological wastewater technical and treatment in particular. The team includes (besides the administrative administrative staff) members of three departments: the personnel Department of Water technology and environmental engineering, Department of microbiology and biotechnology, and Department of Department of biotechnology. Walid MOKNI DGS PharmD, PhD. Deputy Chief to the Emerging Infectious Risk Unit of the General Directorate for Health, Ministry of Health Papa- DGS PHARM D, MSc Epidemiology and health promotion. Ousseynou NGUER Project manager of microbiological surveillance of waste water at the Directorate General of Health since 2023 Tim-Morris DGS LL/M in European Law and MPA in Public Administration, Advisor SCHMIDT for European Affairs to the Director General for Health and National Focal Point for the EU4Health Programme since 2020. Zoe SENTA- DGS PhD in Pharmacotechnical and Biopharmaceutical Sciences. LOYS Project manager for the prevention of epidemic and biological risks within the Health Directorate since 2022. Christophe Anses Member of the Strategic and Programs Department of the CORDEVANT General Direction at Anses, as Senior Scientific Advisor for Food Safety and Emerging Infectious Diseases. Member of the Scientific Steering Board of the OH EJP (deputy) and the Governing Board of the MedVetNet Association, as well as the board of partners Inserm-ANRS | Emerging Infectious Diseases, steering committee EMERGEN consortium (Consortium for surveillance and research on infectious diseases caused by EMERging pathogens through GENomic sequencing), lead of Anses experts involved in the preparation the One Health EU Zoonoses report - EFSA/ECDC, National Contact Point EU Wastewater Surveillance. Benoit Anses Since 2005, he has been working at Anses as the head of the GASSILLOUD water microbiology department, Nancy Laboratory for Hydrology. This department conduct reference and research activities in water microbiology, dealing in particular with the detection and characterization of water-borne pathogens (bacteria, viruses and parasites). Involved in the OH EJP project COVRIN and lead of WHO R&D Blue Print project Persistence and particulate behavior of SARS-COV2 in environmental water matrices. Ali ATOUI Anses Since 2022, he joined the Anses Nancy Laboratory for Hydrology as researcher involved in the behavioral study and the development of analytical protocol of SARS-CoV-2 and other pathogens in wastewater and sludge. He was Professor of Microbiology at the Lebanese University from the period 2008- 2021 where his research interest was the biosynthesis of various mycotoxins and to develop novel approaches for eliminating the risk of mycotoxin contamination of food sources. Damien MOULY SpF PhD, Epidemiologist, Doctor of Pharmacy and Head of Regional Office at the French public health Agency, Santé publique France. Expertise activities in "water and health", and in charge of the national coordination of two projects for the agency: surveillance 30 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 of drinking water-related infectious diseases and wastewater surveillance. Frédéric SpF Epidemiologist PhD and Environmental Health Engineer, his main JOURDAIN areas of interest are infectious disease surveillance, One Health, vector borne diseases. He is the project manager for wastewater based epidemiology at the French public health Agency, Santé publique France. Márta Vargha NNK Her research field: Water hygiene, the chemical and microbiological quality of drinking and bathing waters, and the biotic and abiotic factors influencing this. Water-related infectious and non-infectious diseases and its health effects. Eszter Róka NNK Research field: wastewater-based epidemiology of SARS-CoV-2, influenza A virus, and poliovirus. AMR in surface water, microbiological hygiene of drinking and bathing water, Legionella risk assessment Gábor Kardos NNK MD, MSc, PhD, clinical microbiologist, head of the Department of Microbiology Reference Laboratories. He previously worked for 20 years in a clinical bacteriology laboratory of a tertiary-care center. His research interest includes genomic epidemiology of antibiotic resistance in a One Health context, pharmacoepidemiology of antibiotic resistance, human, and environmental metagenomics. Mario Fafangel, NIJZ Head of Department of research and development in the field of senior expert communicable diseases at the National Institute of Public Health. Also teaching assistant at University of Ljubljana. With colleagues set up wastewater surveillance for SARS-CoV-2 in Slovenia. An Galičič, NIJZ Researcher in the field of environmental health and junior expert communicable diseases at the National Institute of Public Health. Also teaching assistant at University of Ljubljana. With colleagues set up wastewater surveillance for SARS-CoV-2 in Slovenia. Natalija Kranjec, NIJZ Researcher in the field of environmental health and junior expert communicable diseases at the National Institute of Public Health. Involved in the application of advanced analytics and computational techniques. With colleagues set up wastewater surveillance for SARS-CoV-2 in Slovenia. Andrej Steyer, NLZOH Experienced virologist working in the field of enteric and emerging senior expert zoonotic viruses, their evolution and molecular epidemiology. Head of the Public Health Microbiology Department at NLZOH and National Focal Point for Microbiology at ECDC. At NLZOH, he is involved in diagnostics process development and was together with colleagues responsible for setting up the core NGS facility for microbiology surveillance. Despo Fatta- UCY Professor of Environmental Engineering at the University of Cyprus Kassinos, with extensive experience in wastewater-based epidemiology, Professor water quality issues, wastewater treatment and water reuse. She is actively engaged in various national and international activities on wastewater surveillance and monitoring for pathogens of concern to human and environmental health. Georgios UCY Associate Professor of Epidemiology and Public Health at the Nikolopoulos Medical School of the University of Cyprus. He served as member of the National Committees in Cyprus for HIV and HCV, and is currently serving as member of the Scientific Committee advising the Minister of Health of Cyprus on issues related to the COVID-19 pandemic. 31 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Christina CING Christina Christodoulou is the Head of the Department of Molecular Christodoulou, Virology at the Cyprus Institute of Neurology and Genetics. She is Professor an expert in viral infections especially in children. From the beginning of her career in Cyprus, she was engaged in molecular diagnostics of viral infections and responsible at the National level, to identify the viral cause of local epidemics occurring in Cyprus. In parallel, she is carrying out the surveillance of Polio/Enteroviruses not only in clinical samples, but also in wastewater samples and her activities were expanded recently during Sars-CoV2 epidemic. Angeliki Larcou WDD Sanitary Engineer and Coordinator of the Wastewater and Reuse Yiannakou Division of WDD. She coordinates all the wastewater-related activities of WDD. Christos MPHS CY Working at the Unit for Surveillance and Control of Communicable Charalambous Diseases (USCCD) of the department of Medical and Public Health Services, Cyprus (MPHS CY) with research expertise in microbiology, specifically in molecular diagnostics and typing, as well as in national surveillance systems focusing on respiratory viruses. He coordinates the national sentinel surveillance and genomic surveillance systems and recently proposed and coordinated an action regarding wastewater surveillance of SARS- CoV-2 in airports/airplanes in Cyprus. Jurijs CDPC Director of the Department of Risk Analysis and Prevention of Perevoščikovs – Infectious Diseases, He has a doctor of medicine, epidemiology senior expert and occupational hygiene, which is a certificate in public health, over 34 years of professional experience in epidemiological safety and public health, epidemiological surveillance of communicable diseases, prevention and eradication measures, immunization programm, Member of the ECDC Advisory Board, TESSy and EPIS coordinator, EWRS functioning and coordination in the country. Relevant previous projects and activities – EU-JAV, UNITED4Surveillance, RRF 4.1.1.1.i investment. Kate Karolīna CDPC Epidemiologist in the Infectious Disease Surveillance and Tomašūna – Immunisation Unit, Professional bachelor’s degree in health care junior expert and public health specialist qualification, and experience in the field of epidemiological surveillance of the infectious diseases, including the collection and processing of epidemiological data, the planning, organization and implementation the prevention and control measures of infectious diseases. Danija Maļceva CDPC Public health analyst in the Infectious Disease Surveillance and – junior expert Immunisation Unit. Master’s degree in health care in specialization epidemiologist and medicine statistics, and a professional bachelor’s degree in health care and public health specialist qualification, over 3 years of professional experience in the field of epidemiological surveillance of the infectious diseases, including the collection and processing of epidemiological data, the planning, organization and implementation the prevention and control measures of infectious diseases and also the planning and organization of the vaccination processes. Jānis Misiņš – CDPC Head of the Health Statistics Unit at the Department of Research senior expert and Health Statistics, medical doctor and holds a Doctoral Degree from the University of Latvia. He is a Researcher and Assistant Professor in the Faculty of Medicine, University of Latvia, and over 29 years of professional experience in health statistics and research, since 2000 experience in the health statistics working groups of the EC, the WHO, the OECD and the Eurostat as an expert. Relevant previous projects and activities – Euro-Peristat, InfAct, PHIRI, DIPoH, UNITED4Surveillance. 32 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Tatjana Popova CDPC Senior accountant of the Accounting and Finance Unit. She has 33 – administrative years of professional experience in public administration personnel/ accounting and finance, of which at least 22 years in the health project sector and 18 years of work with foreign financial assistance and accountant EU structural funds projects. Inga Selecka – CDPC Master's degree in social sciences in public management and project manager, European affairs, a first-level higher education in pedagogy with a financier vocational teacher qualification, a professional bachelor's degree in food technology, and professional experience in the field of construction, education, employment, science, health and environment of the EU Structural Funds and other EC foreign financial assistance projects as a project author, manager, financier – economist and expert – auditor. Professional experience in public educational institutions of various levels as the head of a structural unit, author of educational programs, lecturer, bachelor's and master’s thesis supervisor and reviewer, professional experience in the field of public procurement and case law. Aivars Bērziņš – BIOR Project manager for the Institute of Food Safety, Animal Health and senior expert, Environment “BIOR”. Director of the Institute “BIOR”. Head of project manager National Reference Laboratory for animal infectious diseases. DVM, PhD, professor. Expertise in epidemiology of infectious diseases, including zoonotic diseases. Olga Valciņa – BIOR Deputy Director for Laboratory Matters. master's degree in senior expert veterinary medicine/ biology/ microbiology. Has over 7 years of professional experience in the prevention of infectious animal diseases, knowledge of the basic principles of diagnosis of infectious diseases, assessment (examination) of diagnostic and control situations, preparation of regulatory documents, supervision, circulation and registration of veterinary medicinal products. Vadims BIOR Dr. Chem. degree in analytical chemistry and over 10 years of Bartkevičs – professional experience in the field of instrumental analysis for senior expert monitoring of pharmaceutically active substances and biomarkers in environmental objects, including wastewater. Head of the Laboratory of Chemistry. Professor of analytical chemistry at the University of Latvia. Expertise in environmental analysis and application of advanced analytical methodologies for wastewater- based epidemiology studies. Jānis Kloviņš – LBMC Head of the Scientific Counciel, he is a highly accomplished ProF. senior expert of Molecular Genetics, who has made significant contributions to the field of genomics. He is renowned for his leadership in establishing the Genome Database of Latvian Population and representing Latvia in various international research organizations. As an expert in molecular epidemiology, Prof. Klovins leads several research projects in this area and has authored over 100 research papers that have been widely cited in the scientific community. In addition to his impressive track record in research, Prof. Klovins has been actively involved in COVID-19 research, where he has played a pivotal role in introducing sequencing-based SARS-CoV- 2 surveillance in Latvia. Dāvids LBMC Deputy Director for the Maintenance of Scientific Infrastructure. Fridmanis – Doctoral degree in molecular biology and extensive experience in senior expert establishing and running the state of the art sequencing facilities at LBMC. Vast experience in NGS based research in various fields of Life Sciences. Leader of scientific group engaged in human microbiome research as well as in studies of soil, microplastic, plant and seed associated microbiome and most important in the context of this proposal – wastewater based epidemiology research. 33 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Līga Vonda – LBMC Deputy Director for Financial and Administrative Matters. She has project manager, a master’s degree in social sciences in education management and financier more than 11 years of professional experience in the field of science management and the EU Structural Funds and other EC financial instruments financial and administrative management. Henry-Michel LIST Head of the Environmental Microbiology Research Group. Water Cauchie scientist with 20+ years of experience in the field of wastewater treatment, monitoring of waterborne pathogens in the water cycle and protection of surface and groundwater. Associate professor at the University of Liège (BE) and Luxembourg (LU) in ecology, water science, microbiology and environmental risk assessment. Leslie Ogorzaly LIST Senior Researcher in charge of the National wastewater-based epidemiological observatory since 2020. She is an aquatic virologist specialised in the fate and transport of enteric viruses along the water cycle. She is mastering culture as well as molecular biology techniques and develops sensors for detecting specifically aquatic viruses. Louise Hock LIST PI specialised in the detection and elimination of antimicrobial- resistant bacteria. She is specialised in the use of bacteriophages to control target bacterial populations in agro-food industry and the environment. She is affiliated to the National wastewater-based epidemiological observatory as far as antimicrobial-resistant bacteria are concerned. Sabrina Deroo LNS Scientific Officer at the Department of Microbiology at LNS. After a PhD in vaccinology, she took the Head of the Immuno-virology Unit at the Centre de Recherche Public - Santé in Luxembourg. Then, she has been project leader and site manager for private companies in the field of cancer therapeutics. Giuseppina La ISS Environmental virologist, experienced in the molecular Rosa characterization and epidemiology of viruses in water environments. She has been focusing on Wastewater-Based Epidemiology for the surveillance of pathogenic human viruses, including SARS-CoV-2, and coordinates the Italian national surveillance program for SARS-CoV-2 and its variants in wastewaters (EU Recommendation 2021/472). Elisabetta ISS Virologist, with experience in detection, quantitation and genetic Suffredini characterization of viruses in food, veterinary and environmental samples. Responsible for the Italian National Reference Laboratory for foodborne viruses and member of EFSA BioHaz panel since 2017. Since the beginning of the COVID-19 pandemics she has been focusing on the surveillance of SARS- CoV-2, coordinating the Italian national surveillance program for SARS-CoV-2 and its variants in wastewaters (EU Recommendation 2021/472). Other staff: ISS Besides the key persons named above, ISS team will include senior and junior several other researchers with complementary expertise and experts, experience (molecular biologists, bioinformaticians, administrative epidemiologists, chemists, engineers, IT specialists, etc.) from personnel different departments/centres of ISS. Pasqualino IT MOH Director of Office 4 at the General Directorate of Health Rossi Prevention, Ministry of Health. Coordinates national health and safety policies and ensures compliance with regulations related to water and air quality, workplace safety, and medical-legal advice; currently public health projects with regions and countries in the 34 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Euro-Mediterranean area, in collaboration with the World Health Organization and the European Commission. Piero Poletti FBK Ph.D. in Mathematics and epidemic modeler. His primary research interest is the investigation of the dynamics of infectious diseases using computational models applied to real-world data with the goal of informing public health decisions. His expertise includes the development, simulation, and analysis of compartmental and agent-based models, the adoption of statistical inference and Bayesian approaches to analyse epidemiological records, and the performance of cost- effectiveness analyses. Authored more than 60 research contributions in peer-reviewed journals. Danilo Cereda RLDGW Medical Doctor, Specialization in Hygiene and Preventive Medicine PhD Public Health. From 2022 Director of Prevention Unit of Lombardy Region. Experience in assessment and management of regional activities concerning Infectious Diseases, Vaccinations and information systems of prevention activities; manager of the infectious disease surveillance system of the Lombardy region. Sebastian Haller RKI Deputy head of the Healthcare-Associated Infections, Surveillance of Antimicrobial Resistance and Consumption unit. He is a medical doctor by training. He also has a Master in Public Health and an MSc in Applied Epidemiology. He is a senior field epidemiologist and graduate of the Postgraduate Training for Applied Epidemiology (PAE) at the RKI. His research focuses on understanding transmission of pathogens in health care settings and burden of infectious diseases. Alexander RKI Biologist and specialist for infectious diseases, biomedicine and Schattschneider laboratory diagnostics. He has hands-on experience in microbiology up to BSL-3 level. He has a history as a data scientist, science consultant and communicator, process developer and process manager. At the RKI, he is part of the waste water surveillance team, helping with implementing this novel technology in public health. Martin Hölzer RKI Bioinformatician by training and specialized in the analysis of high-throughput sequencing data. He has worked with (meta- )genomic and transcriptomic data and analyzed diverse species ranging from viruses, bacteria, and fungi to eukaryotes. He has profound knowledge in the development of bioinformatics tools and computational pipelines using workflow management systems. In this context, he also started to work in the field of wastewater sequencing data analysis with a focus on SARS-CoV- 2 and the detection of mutations and lineages. At the RKI, he is part of the Genome Competence Center (MF1) and team lead of the “Experimental and Bioinformatics Innovations” team. Theodoros AUTH Head of the School of Chemistry at the Aristotle University of Karapantsios Thessaloniki (AUTH), Greece, and coordinatior of the AUTHWBE group, with scientists from 7 different departments. He has coordinated around 66 projects. He is author and co-author in more than 180 publications in peer reviewed Science Journals. He is a co-holder of 4 European patents and 2 Greek patents. Nikolaos NKUA Prof. of Analytical Chemistry, specialized in Environmental Thomaidis Chemistry (>350 papers and 17 book chapters, >12,700 citations, h-62). Active member of the international SCORE network on sewer biomarker analysis for community health assessment 35 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 (COST Action ES1307, 896141) and coordinator of a Marie Skłodowska-Curie Individual Fellowship entitled “NTS- EXPOSURE: The innovative wastewater-based epidemiology approach with the advances of high-resolution mass spectrometry as a complementary bio monitoring tool for assessing the health status of a population”. Nikiforos NKUA Post-doctoral fellow, leading Analytical Chemist in the field of Alygizakis wastewater-based epidemiology and expert in Data Science. Creator of the Digital Sample Freezing Platform (DSFP): a pan- European platform to monitor the occurrence of chemicals in samples, through wide-scope suspect screening, and has the potential to revolutionize chemical monitoring and management. Christos UTH Professor of Hygiene and Epidemiology at the School of Medicine Hadjichristodoul of the University of Thessaly (UTH) in Larissa, Greece. He is the ou Director of the University’s Department of Hygiene and Epidemiology and Director of the Peripheral Public Health Laboratory of Thessaly. He is the Head of the WHO Collaborating Center for the International Health Regulations: points of entry. He is the Coordinator of the ongoing Horizon Europe project HEALTHY SAILING. He was the Coordinator of the EU HEALTHY GATEWAYS Joint Action focused on preparedness and action at points of entry including ports, airports, and ground crossings , and the EU SHIPSAN ACT Joint Action . He was the Project leader of the SHIPSAN TRAINET project, the Scientific Coordinator of the SHIPSAN project. Varvara UTH Associate Professor of Hygiene and Epidemiology at the Mouchtouri Laboratory of Hygiene and Epidemiology, University of Thessaly and currently is the scientific manager of the HEALTHY SAILING HORIZON EUROPE research and innovation project. In the past, she has been the manager of several European projects related to health and hygiene. She has held positions as a technical officer in WHO headquarters (International Health Regulations Capacity Development at points of entry), and as a researcher at the UK Health Protection Agency. She is the principal author of several EU guidelines related to prevention and control of COVID-19 pandemic. Michalis UTH Environmental engineer and a postdoctoral researcher at the Koureas Laboratory of Hygiene and Epidemiology of the University of Thessaly. Experienced in Environmental Health, Environmental Epidemiology, Exposure Assessment and instrumental analysis. Evangelia Ntzani UOI MD, PhD, Professor of Epidemiology and Adjunct Professor of Health Services, Policy and Practice at Brown University School of Public Health, RI, USA. Board-certified pediatrician and community medicine and public health specialist. Member of EFSA CONTAM Panel and the Chair of the SAPEA Working Group on Pesticide Toxicity Assessment. She is a member of the National Wastewater Surveillance Program in Greece, leads the Ioannina Wastewater Surveillance and Seroprevalence studies, and is a member of the COVID-19 Host Genetics Initiative. Eve Robinson HSE Eve Robinson is a Specialist in Public Health Medicine at the Health Protection Surveillance Centre. She is a Member of the Faculty of Public Health Medicine of Ireland (MFPHMI) at the Royal College of Physicians of Ireland. 36 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Wim Meijer UCD Professor of Microbiology, highly experienced in research on water quality, pathogens and animal health. He leads the National Wastewater Surveillance Laboratory and is experienced in participating and leading large scale EU programmes. Michael Carr UCD Senior Clinical Scientist at the National Virus Reference Laboratory. Associate Professor, Global Station for Zoonosis Control, GI-CoRE, Hokkaido University, Japan. Experienced virologist, expert in NGS and advanced sequence analysis Gabriel UCD Clinical bioinformatician at the National Virus Reference Gonzalez Laboratory. Virologist, expert in advanced sequence analysis Eadaoin Joyce Uisce Éireann Responsible for increasing innovation capability across the business and the delivery of strategic R&D for Irish Water to address core business challenges. Eadaoin Joyce represents Uisce Éireann on the Steering Committee of the National Wastewater Surveillance Programme. Algirdas NVSPL-LT Leading clinical and molecular biology scientist of the National Griskevicius Public Health Surveillance Laboratory (reference laboratory in the field of microbiology), ECDC national focal point for microbiology. Andreea INSP Epidemiologist at the National Institute of Public Health-, Romania, Niculcea National Center for Surveillance and Control of Communicable Diseases. Ciprian Ilie INSP Biochemist at the National Institute of Public Health Romania in the Seroepidemiological laboratory. Denisa Janta INSP Epidemiologist at the National Institute of Public Health, Romania, National Center for Surveillance and Control of Communicable Diseases. Hans Peter AGES Head of Dpt. Statistics and Analytical Epidemiology Stüger Karin Weyermair AGES Senior expert in Dpt. Statistics and Analytical Epidemiology Herbert MUI Chief scientific officer of the Austrian reference laboratory for Oberacher SARS-CoV-2 wastewater monitoring (Institute of Legal Medicine, Medical University of Innsbruck) Julia Vierheilig TU WIEN Head of research group “Molecular Microbiology in Sanitary Engineering”- Institute for Water Quality and Resource Management – Technical University of Vienna Paula Vassallo HPDPD Director of the Health Promotion and Disease Prevention Directorate (HPDPD) within the Ministry for Health (MFH) in Malta. Project Lead of the Joint Action EU-WISH in Malta. Tanya Melillo IDCU Head of the Infectious Disease Prevention and Control Unit in Malta. She is a medical doctor and a specialist in Public Health Medicine. Her qualifications include a Master's in Public Health Medicine. She was responsible through participation in an EU project to initiate waste water surveillance on covid19 in Malta since 2022. 37 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Liliana Cuschieri IDCU Medical doctor with a Master's in Public Health Medicine working as a Consultant in Public Health Medicine within the Infectious Disease Prevention and Control Unit, Malta. Anna Psaroulaki UoC Associate Professor of Microbiology/Zoonoses. Lead of: the Unit of Zoonoses & Geographical Medicine; the reference Lab of Rickettsiae & Tick-Borne diseases; and the Lab of Food Water & Environment Microbiology (Medical School of Crete. Head of the Regional Public Health Laboratory of Crete. She has an extended experience in national & international research projects. Member of: ESCMID, ESGLI. Over 135 publications in peer review journals (citations: 3139, h-index: 33) Dimosthenis UoC Post-doc researcher, at the laboratory of Clinical Microbiology and Chochlakis Microbial Pathogenesis. Over 15-year experience in molecular microbiology and epidemiology of water/food/vector borne pathogens. Is engaged on the surveillance of SARS-CoV-2 in wastewater. Over 65 publications with an h index of 18. Other staff of UoC Senior and junior scientists with an expertise on molecular senior and junior microbiology and bioinformatics. The staff belongs to the units of scientists bioinformatics, WGS and NGS and of food, water and environmental microbiology Oksana UPHC Head of the department of epidemiological surveillance at the State Koshalko, institution «Public Health Centre of the Ministry of Health of senior expert Ukraine». Coordinator of infectious disease surveillance at the national level, which includes the development of draft legal acts, informational and advisory support, and coordination of the work of 25 regional disease control and prevention centers. Kateryna UPHC Chief specialist in project management and international Shadura, project cooperation of the State institution «Public Health Centre of the manager Ministry of Health of Ukraine». Nataliia UPHC Chief Specialist in Financial support. Toryanyk, administrative personnel Outside resources (subcontracting, seconded staff, etc) If you do not have all skills/resources in-house, describe how you intend to get them (contributions of members, partner organisations, subcontracting, etc.). If there is subcontracting, please also complete the table in is an section 4. AUSTRIA: AGES will have one subcontractor (Subcontractor 1, IT company) to achieve activities requiring database-related expertise in Task 6.2. SLOVENIA: NIJZ will collaborate with an external subcontractor, referred to as "Subcontractor S6.2 - Modelling and Statistics Expert," to assist in the successful implementation of tasks T6.2 and T6.3. The involvement of this expert is vital in providing specialized expertise in database-related matters and offering advanced statistical guidance to NIJZ. The primary responsibilities of Subcontractor S6.2 for task T6.2 and T6.3 will encompass the following: - Assisting NIJZ in the design and implementation of suitable statistical methods. - Analyzing and interpreting data to derive meaningful insights that aid in decision-making processes for integration of wastewater surveillance data into existing public health surveillance systems 38 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 - Providing extensive knowledge and expertise in data modeling approaches and statistical counseling to enhance the efficiency and accuracy of the identified tasks. - Assisting NIJZ in handling and managing complex database-related tasks. - Collaborating with NIJZ to develop strategies for optimizing data storage, retrieval, and analysis. By having Subcontractor S6.2 as a valuable partner, NIJZ aims to strengthen its capabilities in handling data-related challenges and ensuring the accuracy and reliability of statistical analyses throughout the project's implementation. Subcontracting is not used for management or other core activities. Experts (if applicable) Explain if national and/or international experts will be nominated by national authorities to support the project implementation. Describe the specific professional and technical expertise and experience of each proposed expert and their contribution to the project implementation. Provide CVs (if required). Minimum requirements: • Qualification: A level of education which corresponds to a Bachelor's degree. • Professional experience: At least 4 years of proven experience in XXX • Other skills: ability to work in English (minimum B2 level) Not applicable. 2.4 Consortium management and decision-making Consortium management and decision-making (if applicable) Explain the management structures and decision-making mechanisms within the consortium. Describe how decisions will be taken and how regular and effective communication will be ensured. Describe methods to ensure planning and control. Note: The concept (including organisational structure and decision-making mechanisms) must be adapted to the complexity and scale of the project. The management structures of EU-WISH are tailored for the complexity-level and design of the project. In addition to overall coordination and management, the WP-structure ensures optimal planning and monitoring by the Project Management Team. All participating countries are involved in decision making via their nominated members of the Steering Board. The Stakeholders Committee ensures alignment and dialogue with international organisations. All MS and associated countries are provided the opportunity to be represented in the Sustainability Working Group. The consortium already has a shared online working environment. Consortium Agreement is prepared and signed, and operational aspects of the governance are discussed and decided at the very beginning of the project. The governance structure of EU-WISH has the following key actors: The Coordinator, SSI, acts as the intermediary between the consortium and the Granting Authority. SSI is solely responsible for all financial, administrative and legal obligations for project coordination in accordance with the Grant Agreement and will in no way delegate or subcontract these responsibilities to another party. Experienced coordinators and Project Managers, at SSI, manage the administration in close collaboration with a designated Financial Manager, and supported by a team with complementary expertise and skills. EODY is the scientific and technical co-coordinator, with focus on the project’s technical implementation and scientific excellence, in collaboration with the coordinator SSI. The leading managers of the project from SSI and EODY collaborate closely and have regular meetings; they make up the Project Leadership Team and ensure efficient consortium management and effective project implementation.Steering Board (SB): Representatives from HERA and from each of the participating country will be invited as members of the Steering Board. Steering Board is important for close 39 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 coordination in relation to implementation of national initiatives and other projects the consortium members are part of. Strategic decisions and decisions of any relevant changes in the work are formally made by the Steering Board. The General Assembly (GA): equal to the representatives of the Parties in Steering Board, is the decision-making body of the consortium. The consortium will sign a Consortium Agreement. Stakeholders Committee (SC): Relevant international organisations will be invited to nominate a member to the Stakeholders Committee. The Stakeholders Committee is a forum for dialogue and dissemination, and discussion about needs of e.g. EU-agencies ECDC and EMA. Moreover, global stakeholders will be included, e.g. WHO. HERA is a key member of the committee, and JRC will also be invited to the Stakeholders Committee from the start. Project Management Team (PMT): Project Management Team will consist of the Project Leadership Team and Work Package Leaders and Co-Leaders. Project Management Team oversees the progress of the work and communication within the consortium as well as to Steering Board, Stakeholders Committee and Sustainability Working Group, and if relevant changes are needed, formulates suggestions to the Steering Board and/or General Assembly for decision-making. Each task will also have a nominated Task Leader, who report to the respective work package Leader. Sustainability Working Group (SWG): The SWG will comprise representatives of all Member States and associated countries. The aim of the SWG is to ensure uptake and continuation of EU-WISH solutions across Europe. The representatives from each country can be e.g., from national ministries and/or national institutes of relevance to the work carried out in EU-WISH. The SWG is the forum for sharing experiences and best practices and is intended as the key outreach and communication channel of EU-WISH with Member States and associated countries. The objectives of the SWG are to propose a strategy and plan to involve non-participating countries, both during and beyond the grant duration, and to contribute to establishment of a sustainable governance mechanism. #§CON-SOR-CS§# #@PRJ-MGT-PM@# 2.5 Project management, quality assurance and monitoring and evaluation strategy Project management, quality assurance and monitoring and evaluation strategy Describe the measures planned to ensure that the project implementation is of high quality and completed in time. Describe the methods to ensure good quality, monitoring, planning and control. Describe the evaluation methods and indicators (quantitative and qualitative) to monitor and verify the outreach and coverage of the activities and results (including unit of measurement, baseline and target values). The indicators proposed to measure progress should be relevant, realistic and measurable. PMT oversees the progress of the work. WP1 is responsible of project management, including planning, control and monitoring against the objectives, milestones and deliverables, and ensures that ethical and legal standards are complied to, and that the project implementation is completed in time. Effective, open communication and continuous improvement is supported by regular meetings There will be close collaboration with key stakeholders to minimize risk of conflict, increase clarity and support successful implementation. Effective economic management will be ensured throughout the project. Evaluation of the project is the focus of WP3. KPIs (Table 1) are relevant, realistic and measurable, they are discussed and agreed on at Kick-off meeting, They will be further elaborated according to the specific project needs and objectives during the preparation of the project evaluation plan. They’re used to evaluate project progress over time and in the final report. A survey among project partners will assess adequacy of the project for Member States, quality of project coordination & communication and create an opportunity for feedback. Evaluation is done along the project lifetime. Quarterly meetings per WP assess progress and discuss any needs/support required to produce deliverables and reach milestones. Adjusting to unforeseen circumstances will be strategically supported where necessary to ensure task success and outcome quality. Quality assurance is an inherent part of the work and detailed for the specific activities as applicable. Quality of all deliverables and outputs will be high. The outputs will be in English, and the consortium has native speakers as well as participants with extensive international experience in editorial roles of scientific journals. #§PRJ-MGT-PM§# #@FIN-MGT-FM@# 2.6 Cost effectiveness and financial management 40 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Cost effectiveness and financial management Describe the measures adopted to ensure that the proposed results and objectives will be achieved in the most cost- effective way. Indicate the arrangements adopted for the financial management of the project and, in particular, how the financial resources will be allocated and managed within the consortium. Do NOT compare and justify the costs of each work package, but summarize briefly why your budget is cost effective. The budget is balanced and financial resources are allocated so that each partner has the sufficient and appropriate resources needed for the work planned. The budget allocation took into consideration country- level needs and the resources needed to address them, as well as contribution of the partners to the overarching work packages. It is noted that the budget and time are limited for the size of the consortium and for the ambitious aims of the call. However, no major compromises had to be done when planning the work: the ambition level is high, while the budget is realistic and the feasibility of conducting the work is ensured. The coordinator manages the project budget and ensures timely actions and communication regarding all financial aspects of the project. All partners know the cost eligibility rules well. Best value for money is the main guiding principle for specific budget items. The large consortium is a major benefit for cost effectiveness. Awareness of other ongoing and planned initiatives allows identifying synergies and streamlining the work, resulting in cost-effectiveness by avoidance of duplication of efforts. Sharing of best practices, and possibly resources (platforms, purchases), will contribute to cost-effectiveness. Project meetings will be organised takin benefit of synergies: back-to-back or in parallel. This ensures that the key persons can attend e.g., both the kick-off-meeting and relevant parts of a WP-level workshop, while the number of travels was kept relatively low. Many meetings will be organised online or as hybrid meetings. #§FIN-MGT-FM§# #@RSK-MGT-RM@# 2.7 Risk management Critical risks and risk management strategy Describe critical risks, uncertainties or difficulties related to the implementation of your project, and your measures/strategy for addressing them. Indicate for each risk (in the description) the impact and the likelihood that the risk will materialise (high, medium, low), even after taking into account the mitigating measures. Note: Uncertainties and unexpected events occur in all organisations, even if very well-run. The risk analysis will help you to predict issues that could delay or hinder project activities. A good risk management strategy is essential for good project management. Risk No Description Work Proposed risk-mitigation measures package No 1 Delays in work (likelihood: All PMT monitors the progress of medium, impact: medium) work continuously at task level. Support and challenge-solving are offered proactively. The work plan has minimal dependencies, and those identified (e.g., WP7 depends on input from WP5) were taken into account in the schedule. The participating institutes have skilled staff that can address the challenges. More staff can be allocated to activities as needed. 2 Technical challenges (likelihood: All Technical challenges of different medium, impact: medium) levels – from using a shared working platform to laboratory methods for different targets- may delay the work. However, they are 41 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 considered to be learning opportunities. The participating institutions have skilled staff that can address the challenges. 3 Loss of key personnel or All The participating institutes have partners (likelihood: medium, several staff members with impact: low) relevant expertise and experiences. Replacements and additional staff can be allocated to the project without delays. 4 Cross-border health threat or All The participating institutes, and geopolitical or other event that the consortium as a whole, have forces partner institutes to shift several staff members with focus to response actions or relevant expertise and makes it not possible to have in- experiences. Meetings can be person meetings (likelihood: organised as virtual meetings. medium, impact: low) 5 Cyberattack or other disrupting All All participating institutes have situation (likelihood: medium; efficient risk management for impact: low) possible disrupting situations. Backup copies are taken of all key documents, and alternative ways of communication will be agreed. Cybersecurity of IT solutions is a key focus area, and best solutions will be discussed. Collaboration with EU-HIP will be useful in this. 6 Challenges in interactions with WP1, WP4 The collaboration with stakeholders and decision- stakeholders builds on previous makers, e.g. invited stakeholders collaborations. Many participating decline or do not respond institutes have provided support to (likelihood: low, impact: low) decision-makers during COVID-19 pandemic and in relation to other health threats, and thus the links to key decision-makers are already well established. If needed, alternatives are found to cover the areas of expertise. 7 Challenges in managing the WP1 The consortium is large but highly large consortium (likelihood: low, motivated to work together, which impact: low) was demonstrated during preparation of the proposal. The coordination team is experienced in managing large projects. Support from HADEA is utilised. Challenges in the management are addressed proactively and actively in a collaborative manner. #§RSK-MGT-RM§# #§QUA-LIT-QL§# #@IMP-ACT-IA@# 3. IMPACT 3.1 Impact and ambition 42 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Impact and ambition — Progress beyond the state-of-the-art Define the short, medium and long-term effects of the project. Who are the target groups? How will the target groups benefit concretely from the project and what would change for them? Does the project aim to trigger change/innovation? If so, describe them and the degree of ambition (progress beyond the status quo/state-of-the-art). The main objective of EU-WISH is to support activities, to enhance and improve national public health wastewater surveillance capacities by strengthening knowledge exchange and sharing best practices. Impact at national level is ensured in all participating countries. EU-WISH has an ambitious common goal to contribute to vision of wastewater surveillance in Europe and globally, and the consortium has the critical mass of expertise, capacities and geographical coverage to achieve it. EU-WISH will deliver impactful results. All EU-WISH outputs will finally be assessed and used to design recommendations and algorithms for the integration of wastewater surveillance in Public Health Preparedness Plans for different targets and scenarios, in collaboration with the ECDC NFP for Preparedness and Response, HERA, WHO and other relevant national, EU and international stakeholders. By bringing together MSs authorities (public health ministries, health institutes and/or laboratories) or other relevant structures at national, regional and/or local level and formulating robust harmonised approaches for implementing wastewater surveillance, EU-WISH will increase surveillance capacities at national and EU level and will facilitate the integration and complementarity of wastewater surveillance with other surveillance systems with a clear public health perspective to strengthen preparedness and response to cross border health threats. Key target groups for impact of EU-WISH include: 1. Member States. EU-WISH contributes to building mutual trust and cross-border collaborations. 2. HERA, JRC, ECDC, other EU agencies and structures, and international actors such as WHO. These will be involved e.g. as members of Stakeholders Committee. 3. Other relevant initiatives and projects. EU-WISH will be active in identifying synergies and collaborating, to ensure impact of EU-WISH as well as support achieving impact of other relevant initiatives. 4. Specific professional groups, including from public health, medical, environmental, socioeconomic and technical fields. The work builds on expertise of multidisciplinary groups, all of which have their networks. 5. General public. EU-WISH will be of interest for and will have positive impact on the general public. EU-WISH will contribute to overall increase of awareness and to building trust in work done for better preparedness. Improving preparedness is beneficial for everyone. EU-WISH has impact already. The 26 participating countries have worked together to compile this proposal, and other countries have indicated interest to learn from the outcomes. The involvement of high number of countries and focus on sustainability in the plan (WP4) ensure that the impact will be long-term and sustainable after the funding for the project ends. Expected overall long-term impact of EU-WISH is substantial, and the EU-WISH consortium is optimal for achieving as much as is possible during the project duration towards the ambitious aims. Ultimately, the outcomes of EU-WISH will enhance preparedness and response at EU level. This action will complement international actions on epidemic intelligence and integrated surveillance (by EU-agencies as well as global actors). #§IMP-ACT-IA§# #@COM-DIS-VIS-CDV@# 3.2 Communication, dissemination and visibility Communication, dissemination and visibility of funding Describe the communication and dissemination activities which are planned in order to promote the activities/results and maximise the impact (to whom, which format, how many, etc.). Clarify how you will reach the target groups, relevant stakeholders, policymakers and the general public and explain the choice of the dissemination channels. Describe how the visibility of EU funding will be ensured. A range of communication and dissemination activities are planned to ensure visibility and impact of EU- WISH. A communication and dissemination plan will be developed, to outline the communication and 43 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 dissemination strategy and activities, cover timelines of dissemination activities, internal communication tools, key messages and visual identity, and dissemination channels and networks. Moreover, it is important to identify the categories of the population that could directly benefit from the project, who could be the best advocates and those who could develop resistance to the implementation of the project. This work contributes to the mapping of existing projects and initiatives with similar activities. An overall communication and dissemination strategy will be defined and take into account all Member States and have special focus on stakeholders. The Sustainability working Group (SWG) is intended as the key outreach and communication channel of EU-WISH. Specific details on the potential stakeholders and target audiences and how they will be reached on all relevant levels are finalised at the beginning of the project and included in the project’s Dissemination Plan. Key aspects of communication and dissemination activities are: 1. Webpage for EU-WISH will be established integrated to the institute website of the main coordinating institute, SSI. The webpage will provide general information and link to further resources. Pages briefly presenting the project objectives and results will also be created on the websites of all consortium members. The consortium will also collaborate closely with JRC, in order to disseminate the project’s results through the DEEP platform, as deemed appropriate. A project leaflet will be designed and made available as pdf as wells as printed copies (100 copies). Project hashtag for social media will be introduced at the start of the project. 2. Dissemination efforts will be continuous and will be implemented at national, regional and international levels. Target audiences include Member States, stakeholders and general public. Stakeholder mapping, which will take place at the project’s early stages, will allow a better definition of the relevant target groups as well as a target-group specific design of communication and dissemination activities. A Dissemination report will be compiled. 3. FAIR principle is followed: EU-WISH aims to improve the Findability, Accessibility, Interoperability, and Reuse of digital assets. 4. EU funding is acknowledged in all presentations and communication materials. EU logo will be visible in communication and dissemination of EU-WISH. #§COM-DIS-VIS-CDV§# #@SUS-CON-SC@# 3.3 Sustainability and continuation Sustainability, long-term impact and continuation Describe the follow-up of the project after the EU funding ends. How will the project impact be ensured and sustained? What will need to be done? Which parts of the project should be continued or maintained? How will this be achieved? Which resources will be necessary to continue the project? How will the results be used? Are there any possible synergies/complementarities with other (EU funded) activities that can build on the project results? Sustainability is important and the key specific focus in WP4. The involvement of high number of countries and having focus on sustainability across the project ensures sustainability after the funding for the project ends. Sustainability will be discussed regularly throughout the project lifetime, to ensure that pertinent aspects are an integral part of the activities. Sustainability-promoting recommendations for the continued implementation beyond project duration will be compiled. Sustainability proposals will build on the mapping and analysis of both national and regional structures, and the advancements achieved during the project. Development of viable proposals and recommendations will be carried out in cooperation with a range of stakeholders and in coordination with relevant other international projects. The Sustainability working Group (SWG) is intended as the key outreach and communication channel of EU-WISH with Member States and associated countries. We will work together with national contacts, as well as country representatives appointed to the EU-WISH Steering Board to identify appropriate members for the SWG. Particular efforts will be placed in engaging countries which are not part of the EU-WISH consortium, athrough dissemination and awareness increasing activities as well as through inviting relevant actors into relevant capacity building and networking activities. SWG members will hold a yearly meeting and will be invited to attend project General Assembly meetings. In collaboration among all WPs a specific plan of action for the SWG will be developed at the start of the project, to ensure sustainability and continuation across Member States and associated countries, and support widening of the network after EU-WISH's project duration. 44 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Collaboration with JRC, as a member of the Stakeholder Committee, will be established from the beginning of the project in order to identify synergies, avoid overlapping activities, and enhance the impact and sustainability of the project results. #§SUS-CON-SC§# 45 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 #@WRK-PLA-WP@# 4. WORKPLAN, WORK PACKAGES, ACTIVITIES, RESOURCES AND TIMING 4.1 Work plan Work plan Provide a brief description of the overall structure of the work plan (list of work packages or graphical presentation (Pert chart or similar)). The work is divided into seven work packages (WP), with specific tasks. Many of the activities are done in collaboration across WPs. All key achievements will be collected to the main deliverable D1.2, which will include chapters on DEFINITION OF WASTEWATER SURVEILLANCE STRATEGIES; DEFINITION OF TECHNICAL PROcEdURES; ESTABLISHMENT OF GOVERNANCE FRAMEWORK; COMMUNICATION; and SUSTAINABILITY AND FINANCIAL VIABILITY OF THE WASTEWATER SURVEILLANCE. The WP-structure is designed according to this. 4.2 Work packages, activities, resources and timing WORK PACKAGES Work packages This section concerns a detailed description of the project activities. Group your activities into work packages. A work package means a major sub-division of the project. For each work package, enter an objective (expected outcome) and list the activities, milestones and deliverables that belong to it. The grouping should be logical and guided by identifiable outputs. Projects should normally have a minimum of 2 work packages. WP1 should cover the management and coordination activities (meetings, coordination, project monitoring and evaluation, financial management, progress reports, etc) and all the activities which are cross-cutting and therefore difficult to assign to another specific work package (do not try splitting these activities across different work packages). WP2 and further WPs should be used for the other project activities. You can create as many work packages as needed by copying WP1. For very simple projects, it is possible to use a single work package for the entire project (WP1 with the project acronym as WP name). Work packages covering financial support to third parties ( only allowed if authorised in the Call document) must describe the conditions for implementing the support (for grants: max amounts per third party; criteria for calculating the exact amounts, types of activity that qualify (closed list), persons/categories of persons to be supported and criteria and procedures for giving support; for prizes: eligibility and award criteria, amount of the prize and payment arrangements). Enter each activity/milestone/output/outcome/deliverable only once (under one work package). Ensure consistence with the detailed budget table (if applicable). 46 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Objectives List the specific objectives to which the work package is linked. Activities and division of work (WP description) Provide a concise overview of the work (planned tasks). Be specific and give a short name and number for each task. Show who is participating in each task: Coordinator (COO), Beneficiaries (BEN), Affiliated Entities (AE), Associated Partners (AP), indicating in bold the task leader. Add information on other participants’ involvement in the project e.g. subcontractors, in-kind contributions. Note: In-kind contributions: In-kind contributions for free are cost-neutral, i.e. cannot be declared as cost. Please indicate the in-kind contributions that are provided in the context of the work package. The Coordinator remains fully responsible for the coordination tasks, even if they are delegated to someone else. Coordinator tasks cannot be subcontracted. If there is subcontracting, please also complete the table below. Milestones and deliverables (outputs/outcomes) Milestones are control points in the project that help to chart progress (e.g. completion of a key deliverable allowing the next phase of the work to begin). Use them only for major outputs in complex projects, otherwise leave the section empty. Please limit the number of milestones by work package. Means of verification are how you intend to prove that a milestone has been reached. If appropriate, you can also refer to indicators. Deliverables are project outputs which are submitted to show project progress (any format). Refer only to major outputs. Do not include minor sub-items, internal working papers, meeting minutes, etc. Limit the number of deliverables to max 10-15 for the entire project. You may be asked to further reduce the number during grant preparation. For deliverables such as meetings, events, seminars, trainings, workshops, webinars, conferences, etc., enter each deliverable separately and provide the following in the 'Description' field: invitation, agenda, signed presence list, target group, number of estimated participants, duration of the event, report of the event, training material package, presentations, evaluation report, feedback questionnaire. For deliverables such as manuals, toolkits, guides, reports, leaflets, brochures, training materials etc., add in the ‘Description’ field: format (electronic or printed), language(s), approximate number of pages and estimated number of copies of publications (if any). For each deliverable you will have to indicate a due month by when you commit to upload it in the Portal. The due month of the deliverable cannot be outside the duration of the work package and must be in line with the timeline provided below. Month 1 marks the start of the project and all deadlines should be related to this starting date. The labels used mean: Public — fully open ( automatically posted online on the Project Results platforms) Sensitive — limited under the conditions of the Grant Agreement EU classified — RESTREINT-UE/EU-RESTRICTED, CONFIDENTIEL-UE/EU-CONFIDENTIAL, SECRET-UE/EU-SECRET under Decision 2015/444. For items classified under other rules (e.g. national or international organisation), please select the equivalent EU classification level. 47 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Work Package 1 Work Package 1: Project management and coordination Duration: M1 - M36 Lead Beneficiary: SSI Objectives WP1 manages the project and is responsible for its progress and that the work adheres to legislation, rules and guidelines. W P1 coordinates the compiling of deliverables and reports and their timely submission and coordinates organisation of project meetings. WP1 works closely with all other WPs and aligns the work to the general objective and Specific Objectives. WP1 addresses Specific Objectives 4, 5 and 6 and supports addressing Specific Objectives 1,2 and 3. Objectives of WP1: ▪ To manage and coordinate the work ▪ To coordinate the compiling of the main deliverable document D1.2 ‘EU-WISH: Key advancements’ ▪ To establish and maintain contacts with stakeholders and maintain a matrix of collaborations and dependencies with other initiatives ▪ To draft and update Data Management Plan (DMP) of the project Activities and division of work (WP description) Task No Task Name Description Participants In-kind Contributions (continuous and Subcontracting numbering (Yes/No and which) linked to Name Role WP) (COO, BEN, AE, AP, OTHER) T1.1 Management and coordination Efficient management of the project is achieved by using an SSI, all COO, No online platform for working and by structured regular project BEN, AE, meetings. To ensure timely synergies and to avoid overlap, AP WP1 coordinates the mapping activities of EU-WISH, including mapping of other wastewater surveillance activities that EU-WISH partners are involved in, other relevant larger projects, and stakeholders, in collaboration with other WPs. WP1 coordinates project meetings: Kick-off meeting (M3) and annually One Steering Board meeting, two Stakeholder Committee meetings, One Sustainability Working Group 48 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 (SWG) meeting, and regular meetings with HERA. WP1 will also undertake the organisation of additional networking and capacity building workshops to better engage stakeholders across the EU and globally, targeting LMIC in particular, in order to ensure the project’s sustainability and replicability. WP1 coordinates the compiling of the main deliverable document ‘EU-WISH: Key advancements’. The deliverable will summarize the achievements in relation to KPIs and provide recommendations. It will include the following chapters: DEFINITION OF WASTEWATER SURVEILLANCE STRATEGIES; DEFINITION OF TECHNICAL PRODECURES; ESTABLISHMENT OF GOVERNANCE FRAMEWORK; COMMUNICATION; and SUSTAINABILITY AND FINANCIAL VIABILITY OF THE WASTEWATER SURVEILLANCE. This deliverable will be impactful and of importance to MS, HERA, ECDC and other key stakeholders. T1.2 Coordinating collaboration with Contacts and dialogue with key stakeholders are SSI, all COO, No stakeholders established and maintained. Stakeholder organisations are BEN, AE, asked to nominate representatives to follow EU-WISH and AP participate in the Stakeholders Committee. A matrix for aligning with stakeholders and with other initiatives and projects is developed and maintained, to ensure identifying synergies and addressing dependencies. T1.3 Coordinating data management Data Management Plan (DMP) is drafted and updated. SSI, all COO, No DMP is a living document. Focus is on following and BEN, AE, advocating FAIR principle. AP Milestones and deliverables (outputs/outcomes) Milestone No Milestone Name Work Package Lead Beneficiary Description Due Date Means of Verification (continuous numbering No (month not linked to WP) number) MS1 Kick-off meeting 1 SSI Kick-off meeting held. The kick-off M3 Kick-off meeting held. meeting will be held by third month of the project to allow for preparatory work 49 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 on WP and Task level. In this way, the kick-off meeting will be an opportunity for in person collaboration on topics already prepared in advance through online meetings. The EU-WISH project launch will furthermore be highlighted at selected conferences and events during the first months of the project. MS2 Advanced draft of 1 SSI Advanced draft of D1.2 is circulated for M27 Draft circulated and D1.2 commenting and to be assessed in- shared with depth by HaDEA and HERA, that might HaDEA/HERA. request revisions to incorporate in addition to relevant elements from the last months of the project period. Deliverable No Deliverable Name Work Package Lead Beneficiary Type Dissemination Due Date Description (continuous numbering No Level (month (including format and linked to WP) number) language) D1.1 Data Management 1 SSI R PU M6 EU-WISH DMP provides Plan relevant metadata and information on key data used during EU-WISH - e.g. their availability. Sensitive information is retained at participating institutes. English, pdf. D1.2 EU-WISH: Key 1 SSI R PU M36 This main output from advancements in EU-WISH will provide wastewater highlights of the main surveillance in achievements and Europe recommendations for implementing wastewater surveillance for Public Health in EuropeEnglish, pdf. 50 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Estimated budget — Resources See detailed budget table (annex 1 to Part B). 51 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Work Package 2 Work Package 2: Communication, Dissemination and Exploitation Duration: M1 – M36 Lead Beneficiary: LIST Objectives WP2 manages the presentation and communication of results. This includes formats for the actual surveillance data that are generated but also scientific results that evolve from EU-WISH. Communication will be targeted at different groups, including scientific/expert audiences, health authorities, national and EU decision makers and the general public. Objectives of WP2: ▪ To map relevant stakeholders for dissemination, also outside Europe ▪ To develop the communication and dissemination plan that will set out the strategy of EU-WISH to maximize the impact of the project, to increase its visibility and to ensure that the project’s outputs will reach the widest audience possible. ▪ To organise and prepare the Dissemination Report ▪ To assist with dashboards and other IT-platforms for communication of wastewater-based surveillance results. Activities and division of work (WP description) Task No Task Name Description Participants In-kind (continuou Contributions and s Subcontracting numbering Name Role (COO, BEN, AE, AP, (Yes/No and which) linked to WP) OTHER) T2.1 Development and maintenance of a This task aims at identifying the target audiences for LIST, THL, BEN, COO No stakeholder database for communication and dissemination. It will be interlinked INSA, EODY, dissemination with the mapping by other WPs of existing entities INSP involved in wastewater- based epidemiology (WBE) but will expand it to identify additional key actors to inform and mobilise for a better implementation of UOI AE WBE in Europe and outside Europe. T2.2 Development of communication, dissemination and LIST, NIJZ, SSI, BEN, COO No Development of the dissemination, exploitation plan is compiled. Focus is on FAIR RIVM, AGES, communication and exploitation plan principle and aiming to achieving impact. EODY, INSP for EU-WISH 52 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 T2.3 Project communication and The outreach, communication and dissemination LIST, all COO, BEN, AE, No dissemination activities activities that will take place during the project aim at AP reaching multiple audiences and include gathering and consolidation of information about the project, disseminating the information through the communication channels defined in T2.1, and supporting WP1 in coordinating the scientific output of the project, especially ensuring the Open Access to the project outcomes and an acknowledgement of EU funding in all communication, dissemination and exploitation activities T2.4 Assistance to national dashboards This task aims at supporting and coordinating data LIST, COO, BEN No and other IT platforms disseminating sharing and dissemination from and to the national Sciensano, ISS, wastewater surveillance information dashboards and/or other types of IT platforms. This EODY, SSI, task will moreover aim at liaising partners of EU-WISH RIVM, HPSC and identified stakeholders with the Digital European Exchange Platform (DEEP) for SARS-CoV-2 and its variants in Wastewater, hosted by JRC. Furthermore, DGS, UCD, UB AE the DEEP platform will be included in capacity building activities in the EU-WISH project. This task will also collaborate with the EU-HIP project Milestones and deliverables (outputs/outcomes) Milestone No Milestone Name Work Lead Beneficiary Description Due Date Means of Verification (continuous Package No (month numbering not linked number) to WP) MS3 Website and 2 SSI Setup of project website as sub-page M2 Website and social media accounts social media to SSI webpages, opening social established, media accounts MS4 Project leaflet 2 SSI Project leaflet is ready and available M4 Leaflet available for distribution for distribution. Pdf available for consortium members, 100 printed. 53 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 MS5 Dissemination 2 LIST Dissemination and communication M6 The plan is available for participants and plan is available so that the Task 2.3 communication can start efficiently. plan Consolidation of MS6 an operational 2 LIST A GDPR-compliant listing of M6 Listing available for participants and stakeholder listing stakeholders identified as relevant annexed to D2.1. for dissemination targets for communication and dissemination is consolidated. MS7 Workshop about 2 LIST A workshop dealing with sharing M18 Workshop held dashboards and experience about design and use of other platforms for dashboards and other IT platforms for wastewater the dissemination and information surveillance about wastewater surveillance is information organised. Deliverable No Deliverable Name Work Lead Beneficiary Type Dissemination Due Date Description (continuous Package No Level (month (including format and language) numbering linked to number) WP) D2.1 Dissemination 2 LIST R PU M6 A document that describes the and dissemination and communication Communication strategy and tools. It sets out the plan dissemination and communication objectives, key messages, target audiences, communication channels, social media plan, planned budget and relevant indicators for monitoring and evaluation of the project’s dissemination and communication impact. Pdf. English. 54 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 D2.2 Technical 2 LIST R PU 20 Guidance document presenting guidance for how wastewater surveillance data presenting and can be efficiently disseminated to sharing different audiences through the DG wastewater JRC DEEP and other dashboards. surveillance data Pdf, English. D2.3 Dissemination 2 LIST R PU 36 Interim Dissemination Report (M18) Report and Final Dissemination Report (M36) summarising the communication and dissemination activities of EU-WISH. Pdf, English. Estimated budget — Resources See detailed budget table (annex 1 to Part B). Work Package 3 Work Package 3: Evaluation and Preparedness Duration: M1 – M36 Lead Beneficiary: EODY Objectives WP3 evaluates the implementation and preliminary impact of EU-WISH and assesses the potential for integration of its outputs in public health preparedness plans. The task also aims at assessing the effectiveness of wastewater-based surveillance as a public health decision making tool. Objectives of WP3: ▪ To evaluate the implementation against the workplan. ▪ To assess the achievement of the objectives and expected results and the attainment of the KPIs. 55 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 ▪ To assess the effectiveness of wastewater surveillance for public health surveillance and preparedness for the different priority targets and objectives. ▪ To develop recommendations and model procedures for the integration of wastewater surveillance into public health preparedness plans with the active engagement of the relevant national, European and International competent authorities. ▪ To coordinate and prepare the Evaluation Report. Activities and division of work (WP description) Task No Task Name Description Participants In-kind Contributions (continuou and Subcontracting s (Yes/No and which) numbering Name Role linked to (COO, BEN, WP) AE, AP, OTHER) T3.1 Evaluation of implementation and This task coordinates the evaluation of the progress and RKI, all COO, BEN, No impact effectiveness and includes: monitoring and evaluating the AE, AP timeliness, quality and effectiveness of the project’s implementation against the timeplan,outputs, objectives and expected results; monitoring the compliance with the timeplan foreseen to produce the deliverables and reach the milestones, assessing the achievement of the project’s objectives and expected results, and effectiveness by quantifying the Key Performance Indicators at the project’s beginning and end, and designing and implementing a survey to assess the self- evaluated success of EU-WISH in meeting the expectations and needs of the MS. 56 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 T3.2 Evaluation of the effectiveness of This task evaluates the effectiveness of wastewater EODY, COO, BEN No wastewater surveillance surveillance as a public health surveillance and INSP, preparedness tool. Approaches used include defining the Sciensano, effectiveness attributes (target populations, wastewater THL, LIST, surveillance components, comparison, effectiveness NIPH outcomes); creating an open-access, interactive effectiveness evidence map; piloting a multi-country AE survey on the attributes related to the wastewater UOI, surveillance evaluation; performing a mixed-methods RLDGW evidence synthesis by integration of diverse heterogeneous types of qualitative and quantitative evidence and by consideration of effect modifiers; forming the framework for a cost-effectiveness approach according to the WHO guidance and exploring the uncertainty thereof; proposing an update of the ECDC guidelines for evaluation of surveillance systems integrating wastewater surveillance. T3.3 Integration of wastewater surveillance This task focuses on the development of EODY, NIJZ, BEN, COO No in public health preparedness plans recommendations and procedures for the integration of Sciensano, wastewater surveillance into public health preparedness ISS, RIVM, plans by`; reviewing and assessing the EU-WISH outputs THL, HPSC, and identifying those that may be used in preparedness SSI, LIST, plans, development of recommendations for how these NVSC outputs may be incorporated in public health preparedness plans, evaluation of advantages and disadvantages,anddevelopment of model chapters of UTH, UB, AE preparedness plans per priority pathogen or substance DGS, AdP targeted. Task 3.3 will also conduct at least one tabletop Valor, ,DGS- exercisewith stakeholders (e.g. preparedness NFPs, FR UOI, HERA, WHO, ECDC), in order to demonstrate the use of AUTH the recommendations developed during an emergency response. A toolkit for conducting tabletop exercises at CCAES AP national level will also be developed. 57 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Milestones and deliverables (outputs/outcomes) Milestone No Milestone Name Work Lead Beneficiary Description Due Date Means of Verification (continuous Package No (month numbering not linked number) to WP) MS21 Evaluation plan 3 RKI Internal planning and guidance M6 Evaluation plan distributed to WP document that includes specific and Task leaders and annexed in action level indicators and clearly the evaluation reports defined and measurable KPIs for each of EU- WISH specific objectives. Evaluation plan also includes guidelines and timeplan for the assessment of the specified indicators. It will guide the elaboration of the interim and final evaluation report. MS8 Survey on self- 3 RKI Start of survey on self-assessment of M24 Survey distributed assessment of success of EU-WISH among success of EU- participants WISH start 58 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 MS9 Identification of 3 EODY Completion of the review of EU-WISH M26 Input provided to D1.2 EU-WISH outputs, including on wastewater outputs that surveillance effectiveness, and the could be identification of outputs that could be integrated in integrated in Public Health PHPP Preparedness Plans Deliverable No Deliverable Work Lead Beneficiary Type Dissemination Due Date Description (continuous Name Package No Level (month (including format and language) numbering linked to number) WP) D3.1 Evaluation 3 RKI R PU M36 Interim (M18) and final (M36) Report Evaluation Report. The interim report serves to confirm the progress, while the final report will compile the publicly publishable results from the evaluation, with concluding remarks on the entire action. Pdf, English D3.2 3 EODY R PU M36 Report on how wastewater Integration of surveillance could be best Wastewater integrated of in public health Surveillance in preparedness plans. Pdf, English. PHPP Estimated budget — Resources See detailed budget table (annex 1 to Part B). 59 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Work Package 4 Work Package 4: Sustainability and capacity building Duration: M1 – M36 Lead Beneficiary: NIPH Objectives WP4 aims to develop strategies and procedures for the sustainability of the action based on the development and implementation of 1) a governance framework and sustainability plan and 2) in-person and online training resources to ensure knowledge transfer through one-off investment with long-term benefits and the ability to reach a wide audience, especially those in developing countries. Objectives of WP4: ▪ Contribute to governance framework to secure the sustainability and financial viability of the wastewater surveillance at national and EU level. ▪ Strategy framework for capacity building and capacity building events. ▪ Deployment of online training resources to increase surveillance capacities at national and EU level for current and future human health threats. ▪ Coordinate and prepare Sustainability Report. Activities and division of work (WP description) Task No Task Name Description Participants In-kind Contributions and (continuou Subcontracting s (Yes/No and which) numbering Name Role linked to (COO, WP) BEN, AE, AP, OTHER) T4.1 Sustainability aspects of Governance This task contributes to establishment of a RIVM, THL, SSI, BEN, No Framework sustainable and financially viable governance INSA , NNK , LIST, COO framework that promotes collaboration and HSE , , PHC, ISS, coordination among the international NIPH , EODY, participants of the action and aims to provide INSP; coordinated response to emerging health threats and antimicrobial resistance through the monitoring of wastewater. Focus is on AE strategic work of the SWG to address sustainability aspects and financial viability to 60 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 ensure extended implemented systems for , UPAT , UCD , future health threats. DGS , Adp Valor, DGS-FR T4.2 Sustainability plan and Sustainability Development of a long-term sustainability plan NNK ,RIVM , INSA , BEN, No Report and roadmap for the integration of wastewater UPHC , NVSC-LT , COO surveillance in national policies and improve LIST, NIPH , ISS , cooperation mechanisms between EU EODY, SSI, THL Member states. Considering current situation ,INSP, HSE, and future, the task will focus on a) Identification of current gaps and needs at AdP Valor , DGS , AE both national and international level and b) UPAT , UOC, UCD, assessment of future scenarios for regulatory DGS-FR purposes (i.e., in line with the Proposal for a revised Urban Wastewater Treatment Directive) and preparedness for serious cross All border health threats. For assessing financial viability, focus is on: a) assessing lessons learned and results also from other WPs and tasks to perform a financial analysis to estimate the cost of the different scenarios in the different countries and b) design of a high level business model, including the identification of potential revenues streams and potential funding sources and key donors for the long-term sustainability of a global wastewater sentinel system T4.3 Strategy on capacity building Set up strategy plan, roles, responsibilities, NIPH, LIST , THL , BEN No and roadmap for establishing capacity UPHC , INSA , development, exchange of experience, RIVM, NNK , ISCIII, networking and targeted training activities, NVSC,INSP; HSE, both in-person and digital, with the main goal of supporting global actors and low- and middle-income countries to benefit from the UCD, DGS , Adp AE exchange of experience and lessons learned. Valor, AUTH Existing platforms for dissemination of training materials will be utilized to secure the sustainability of the capacity building and training potential. 61 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 T4.4 Capacity building workshop, pilot The strategy plan developed in T4.3 will be HB, NNK , UPHC , BEN No promising approaches and progress followed to perform two in-person workshops RIVM , INSA , assessment in Portugal and Latvia focused on sharing the NIPH, Sciensano, progress reports with experiences and NVSC, CDPC, lessons learnt from the members of the ISCIII, LIST, NVSC, consortium. These workshops will be a platform to exchange knowledge and experience between all the consortium BIOR, LBMC, UCD, members, with a special focus on supporting Adp Valor AE countries experiencing challenges establishing wastewater surveillance systems. Progress of those countries will be monitored and used as "lessons learned" for low- and middle-income countries outside the EU and also include in the online training resources. T4.5 Establishment and deployment of Development of online training resources LIST, RIVM , NIPH , BEN No online training module based on one-off investment with long-term INSA , Sciensano, benefits and the ability to reach a wide NVSC, NNK , audience, especially those in low- and middle- UPAT, UCD, HSE, income countries. The content of the module ISCIII; will be coming from the final outcome of the different WPs. The potential of different existing platforms to host the online training DGS, Adp Valor, UB resources developed by the project will be AE investigated. Milestones and deliverables (outputs/outcomes) Milestone No Milestone Name Work Lead Beneficiary Description Due Date Means of Verification (continuous numbering Package No (month not linked to WP) number) MS10 Progress report 4 RIVM Progress report on sustainability M22 Progress report shared with on sustainability aspects of Governance Framework consortium participants. To be aspects of and preparation of the international also shared and discussed Governance workshop with main stakeholders, such Framework as HERA, JRC and HaDEA. 62 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Progress report 4 NIPH Progress report on the defined M22 Progress report shared with MS11 on capacity strategy for capacity building, consortium participants building outcomes from workshop 1, status on activities online module and preparation of workshop 2. Online training 4 LIST Online training material to be used for M24 Online training material ready MS22 module training and capacity building. to be used by the project. Deliverable No Deliverable Work Lead Beneficiary Type Dissemination Due Date Description (continuous numbering Name Package No Level (month (including format and language) linked to WP) number) D4.1 EU-WISH 4 RIVM R PU M34 Final report on the Sustainability sustainability aspects of EU- Report WISH. English, pdf. D4.2 EU-WISH 4 NIPH M34 Capacity R PU Report on the capacity building Building Report activities of the project and the future capacity building strategy. The report will also include the link to the online training module. English, pdf. Estimated budget — Resources See detailed budget table (annex 1 to Part B). 63 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Work Package 5 Work Package 5: Mapping current actions and future priority targets of wastewater surveillance Duration: M1 – M36 Lead Beneficiary: THL Objectives Wastewater surveillance of poliovirus and illicit drugs has a longstanding history and existing networks in many parts of the world, including several EU MS. Since beginning of COVID-19 pandemic, an increasing interest and multiple important initiatives have been launched at the EU level and globally towards more comprehensive use of wastewater surveillance for public health action. WP5 will collect the main players in the field with existing experiences and use cases from each EU MS and assess the geographical differences and tentative gaps in current activity levels and priorities in wastewater surveillance targets at the European and global level. WP5 addresses Specific Objectives 1 and 2 and supports addressing Specific Objectives 4 and 5. The objectives of WP5 are to: ▪ Conduct a system mapping to identify relevant wastewater surveillance actors and stakeholders and activity levels in each EU MS ▪ Co-create region-specific priority lists and groups of the wastewater surveillance targets with justifications ▪ Identify the specific surveillance targets for respiratory viruses, antimicrobial resistance (AMR), poliovirus and non-poliovirus enteroviruses, emerging pathogens, chemical substances and other health-related biomarkers by scoping reviews ▪ Define in collaboration the objective(s) and surveillance schemes for these main groups of targets ▪ Describe, for each group of targets, the current implementation status for wastewater surveillance as a part of public health surveillance systems Activities and division of work (WP description) Task No Task Name Description Participants In-kind (continuou Contributions s and numbering Name Role (COO, Subcontracting linked to (Yes/No and WP) BEN, AE, AP, which) OTHER) T5.1 Mapping wastewater Transversal system mapping will cover the following actions in each THL, NIPH, all BEN, No surveillance activity in EU MS, and collect the wastewater surveillance activities for public COO, AE each EU MS health action in EU: i) Identification and analysis of relevant actors, authorities and stakeholders; and BE ISCIII 64 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 ii) An electronic survey will review and collect information on the status of wastewater surveillance activities and prior experiences, existing data sources, and format of data. Further, long-term wastewater surveillance strategies, institutional support and international partnerships will be mapped. The previous questionnaires and survey results from EC Joint Research Centre and JA United4Surveillance will create a basis for this survey. T5.2 Define the targets of The priority setting of wastewater surveillance for pathogens, AMR THL, UCD, all BEN, No wastewater and substances is conducted by: COO, AE surveillance i) co-creation with the task participants and their networks to BE receive the priority target lists from each partner countries with ISCIII justifications steaming from public health action needs, relevant practices and WHO guidance and in line with HERA prioritization in collaboration with DURABLE project; ii) collecting and synthetizing the main outcomes regarding the proposed Urban Wastewater Treatment Directive (UWWD) targets from Tasks 5.3-5.7 with special emphasis on technical feasibility, cost-effectiveness and the epidemiological relevance of inclusion of these groups of targets in the future surveillance programs; and iii) arranging an international workshop to further mapping the priorities at the global level and provide a recommendation of the format by which the results of wastewater surveillance should be reported with aim to deliver relevant and actionable information. Many respiratory viruses have pandemic potential as they can T5.3 Wastewater-based spread rapidly in human communities. In this task: AUTH, RIVM, THL, BEN, No respiratory virus i) scoping review will be conducted; to identify the current actions UPHC, ISS, Sciensano, COO surveillance and the potential wastewater surveillance targets from the various LIST, ISCIII, PHAS, groups of respiratory viruses, including but not limiting to SARS- CIPH, CDPC, INSA, CoV-2 virus and its variants, influenza A/B viruses and their SZU, NIPH, NNK, genotypes and RS-virus; EODY, NIJZ, SSI, INSP , ii) surveillance practices will be screened from literature, among HB, MLT, RKI, consortium partners and online sources; to define wastewater AUTH, SPF, RLDGW, surveillance objectives and surveillance schemes for respiratory NKUA, BIOR, LBMC, AE viruses; and MUI, TU WIEN, UCD, iii) the current implementation status of wastewater surveillance for UB, NVSPL, ANSES, respiratory viruses in public health surveillance systems will be UCY, DGS, summarized, including a description of the ongoing actions; towards utilizing the data for decision-making processes. 65 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 T5.4 Wastewater-based Antimicrobial resistance (AMR) causes a silent pandemic that is LIST, RIVM, THL, ISS, BEN, No AMR surveillance threatening the public health. Wastewater surveillance is a powerful Sciensano, CIPH, CDPC, COO tool to detect the slow trends and emerging threats in AMR spread. INSA, NIJZ, NIPH, RKI, To define the best surveillance strategies for AMR determinants: NNK, EODY, ISCIII, SSI, INSP; HB, MLT i) current wastewater surveillance AMR actions will be mapped and the AMR targets best suitable and with highest public health priority AEMPS, CCAES, will be listed in line with the development and implementation of the RLDGW, BIOR, LBMC, European One-Health Action Plan against Antimicrobial Resistance ANSES, UCD, NVI, UCY, AE and the roadmap on antimicrobial resistance for the WHO UCT Prague, UPAT, European Region 2023–2030; UOC, NVSPL, TU WIEN, UOI ii) objective(s) and surveillance scheme including the sampling points (untreated vs. treated sewage) for identified AMR targets will be aligned and outlined; and iii) cross-links with the existing AMR initiatives and relevant projects such as EU-JAMRAI2 will be created to set-up common integrated efforts. T5.5 Wastewater i) A scoping review will be performed, and the consortium networks Sciensano, THL, UPHC, BEN, No surveillance for utilized to identify current practices and existing gaps in the polio LIST, ISS, PHAS, INSA, COO poliovirus and non- and non-polio enterovirus wastewater surveillance in the EU NIJZ, SZU, RIVM, ISCIII, polio enterovirus member states and other countries; NNK, NIPH, EODY, SSI, INSP; HB, MLT, HSE ii) In defining the objectives and monitoring schemes of the poliovirus surveillance at the European and global level, the appropriate sampling protocols, harmonized existing methods for laboratory analysis as well as the subsequent data analysis and UCD, SPF, ANSES, procedures for reporting will be mapped; and RLDGW, UB, NVSPL, CING, DGS, AE iii) integration of existing wastewater surveillance of poliovirus to other activities will be searched for aligning with WHO GPLN worldwide poliovirus surveillance and environmental surveillance expansion program for poliovirus and with non-polio enterovirus network. To draft a consensus definition for ‘emerging pathogens’ that can T5.6 Wastewater be applied within the framework of the revised Urban Wastewater ISS, RIVM, Sciensano, BEN, No surveillance for Treatment Directive: LIST, PHAS, CDPC, COO emerging pathogens i) a preliminary list of relevant emerging pathogens according to the INSA, NIJZ, THL, SZU, HERA/ECDC/WHO prioritization of cross-border health threats and 66 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 collaboration with DURABLE project, using a consensus definition NIPH, NNK, EODY, SSI, and criteria will be created; INSP; HB, RKI ii) surveillance objectives and approaches for these emerging AE pathogens will be defined; and RLDGW, SPF, ANSES, iii) mapping of the application of wastewater surveillance for BIOR, LBMC, UCD, UCT emerging pathogens in public health surveillance systems, along Prague, UPAT, UOC, with specific examples of how the data could be utilized in public UB, MUI, TU WIEN, health decision-making processes will be conducted. NVSPL, CING, NVI, DGS, T5.7 Chemical (non- A list of chemical substances and metabolites, as well as health- THL, INSA, NIJZ, ISS, BEN No infectious) related biomarkers will be created according to their consideration RIVM, LIST, NIPH, substances, illicit as the most relevant or potentially relevant in future for following ISCIII, EODY, Sciensano, drugs and health- different public health related issues in urban wastewater and to CDPC related biomarkers evaluate possible differences between MS in the surveillance NKUA, AEMPS, MUI, AE priorities. The task will focus on illicit and legal drugs of abuse RLDGW, UCD, USC, including alcohol and nicotine markers, psychoactive USAL, UCY, BIOR, pharmaceuticals, and exposure to chemicals and other human LBMC, CIPH, CRO; NVI, health-related biomarkers. Objectives and approaches for DGS, wastewater surveillance will be defined for the defined list of targets, and potential ways to integrate wastewater results with other monitoring methods and data sources will be identified. Milestones and deliverables (outputs/outcomes) Milestone No Milestone Name Work Lead Description Due Means of Verification (continuous Package Beneficiary Date numbering not No (month linked to WP) number) MS12 Survey of wastewater 5 THL A mapping survey of the current M12 Electronic survey results made available surveillance activities wastewater surveillance activities in each to the consortium participants in EU EU MS is designed, conducted and the survey results delivered MS13 International 5 THL Organization of international workshop for M24 Workshop held workshop EU and non-EU experts with JA partners and relevant stakeholders, in order to achieve knowledge exchange for better 67 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 setting the priority targets for wastewater surveillance. In particular: • The principal aim of this workshop is to reach International partnerships mapped in Task 5.1 to discuss and receive feedback, experiences and plans from elsewhere (outside European Union Member States and EU-WISH consortium members) about the priority setting of wastewater surveillance for pathogens, AMR and substances planned in different regions of Europe • The secondary aim is to further plan the wastewater surveillance priorities at the global level during the international workshop and provide a recommendation of the format by which the results of wastewater surveillance should be reported with aim to deliver relevant and actionable information. MS14 Priority setting 5 THL An updated list of surveillance targets M32 Updated list of wastewater surveillance (endpoints from methods) and priorities made available to the surveillance schemes; Scoping and consortium participants priority setting in participant countries Deliverable No Deliverable Name Work Lead Type Dissemination Level Due Description (continuous Package Beneficiary Date (including format and language) numbering linked No (month to WP) number) D5.1 Wastewater 5 THL R PU M34 Report of current practices including a Surveillance State of matrix of the activity levels in all EU the Art and Future countries, future priority list of targets for Priorities in EU common implementation of wastewater Member States surveillance in EU, and 68 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 recommendations to international guidelines. English, pdf. Estimated budget — Resources See detailed budget table (annex 1 to Part B). 69 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Work Package 6 Work Package 6: Usage of wastewater surveillance data for public health Duration: M1 – M36 Lead Beneficiary: mailto:[email protected] Objectives WP 6 focuses on the non-laboratory components of wastewater surveillance; the topics that concern epidemiology and surveillance. WP6 aims to describe and develop knowledge that is theoretically well consolidated but can also be used for practical purposes so that it can support the development of broadly applied wastewater surveillance in Europe, and be applicable in settings where wastewater surveillance is not as yet well established, including in low- and middle-income countries. WP6 will consolidate and develop analysis tools along the directions that MS’s will decide to take, for the different targets. Objectives of WP6 are to develop: ▪ guidance for where to take samples, including of entry ports into the EU (such as airports and planes); ▪ state of the art recommendations for analysis of data depending on purpose and target; ▪ functional and usable analysis components for MS’s to use, containing real data and sample codes; ▪ indicators for and descriptions on how to integrate wastewater surveillance into other types of surveillance systems. Activities and division of work (WP description) Task No Task Name Description Participants In-kind Contributions and (continuou Subcontracting s (Yes/No and which) numbering Name Role linked to (COO, WP) BEN, AE, AP, OTHER)ut h ISS, SSI, INSA, COO, T6.1 Exploring and designing risk-based The overall aim of this task is to explore and LIST, NIPH, RIVM, BEN No wastewater sampling strategies and develop wastewater surveillance sampling AGES, NIJZ, producing guidelines strategies in cities/metropolitan areas, as well Sciensano, HSE, as in specific settings of special interest such THL, RKI, CIPH, as settlements of populations with low ISCIII, PHAS, vaccination coverage, nursing homes, NVSC, EODY, healthcare facilities, points of entry and means 70 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 of transport. The task will also cover situations NNK, INSP, SpF, such as mass gatherings. The objective is to MPHS, UPHC produce guidelines for designing sampling schemes aiming to support risk-based UTH, AdP Valor, decision making that can be used in routine or DGS-FR, UCY, AE in an ad hoc basis considering the UOC, AUTH, epidemiological situation. RLDGW, NKUA , UCD, UCT-Prague, DGS, TU WIEN; ANSES, LBMC, NLZOH, SpFRANCE, WDD AGES, ISS, SSI, COO, Yes, AUSTRIA, as T6.2 Statistical data analysis This task gives a comprehensive overview of INSA, LIST, NIPH, BEN specified in section 4.4 all analytical steps (sampling, data RIVM, NIJZ, preparation, data analysis, visualization, Sciensano, HSE reporting) considering different targets and/or NVSC, THL, RKI, sampling locations. Further, this task prepares SZU, CIPH, ISCIII, an inventory of suitable statistical methods in PHAS, CDPC, a structured way; covering all procedures and EODY, NNK, INSP; statistical measures/indicators from data HB, UPHC quality checks, data preparation, normalization/standardization; smoothing, UTH, FBK, DGS, prediction, early warning aspects; aggregation SpF, UCD, UCY, of results; dealing with missing values and AUTH, NKUA, AE more. This task will also provide functional UOC, UCT -Prague, and usable analysis components for MS’s to , SpFRANCE, use, and has focus on aspects of data Upatras management (in collaboration with WP1). It will contain real data and sample codes. The task will begin by surveying needs and current status of MS’s. 71 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 T6.3 Integration of wastewater surveillance This task focuses on the practical use of ISS, SSI, INSA, COO, No data into existing public health wastewater surveillance data for public health LIST, NIPH, RIVM, BEN surveillance systems purposes. Through cross-cutting analysis will AGES, NIJZ, identify previous successful applications of the Sciensano, HSE , data for intervention, comparing the NVSC, THL, RKI, approaches undertaken. The task will also SZU, CIPH, focus on 'data for action', i.e. analysing PHAS,CDPC,EODY strategies to the development of reliable , ISCIII , NNK, indicators for public health decision-making. INSP; HB, UPHC Finally, the task aims to evaluate approaches for integrating wastewater data with other surveillance data and interpreting them AUTH, FBK, accordingly (depending on the target and RLDGW, DGS, AE surveillance purpose). SpF, UCD, UCY, BIOR, LMBC, UCT - Prague, UPAT, UOC, UOI, NKUA, , SpFRANCE Milestones and deliverables (outputs/outcomes) Milestone No Milestone Name Work Lead Beneficiary Description Due Date Means of Verification (continuous Package No (month numbering not linked number) to WP) MS15 Survey report of 6 AGES Based on an online survey among the M8 Report is made available to the statistical MS about statistical methods used consortium methods and and problems/needs connected with surveillance wastewater data analysis a report is produced. 6 UTG Description of survey strategies, M14 Draft report is made available MS16 First draft considering purpose and target to the consortium combined report on sampling methods MS17 Finalisation of 6 SSI Document that gives a M33 Document is made available to guidance comprehensive overview on suitable the consortium document for statistical methods for the whole 72 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 statistical data statistical workflow. It is enhanced by analysis a range of demonstration examples. Deliverable No Deliverable Work Lead Beneficiary Type Dissemination Due Date Description (continuous Name Package No Level (month (including format and language) numbering linked to number) WP) D6.1 Technical 6 SSI R PU M36 Document and code, collecting recommendation all outputs from the various s for wastewater tasks and subtasks. These surveillance and outputs will be made available decision making as they are produced and validated. English, pdf. Estimated budget — Resources See detailed budget table (annex 1 to Part B). 73 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Work Package 7 Work Package 7: Wastewater surveillance technical procedures, sampling schemes and analysis methods for priority targets Duration: M1 – M36 Lead Beneficiary: RIVM Objectives Wastewater surveillance has great protentional to provide additional information on the circulation of public health threats to aid public health decision making. To strengthen the applicability of wastewater surveillance across the MSs, and ultimately globally, it is important to identify best practices with regard to technical protocols used; and disseminate these clearly defined protocols among the MSs and beyond, so that for example low- and middle-income countries can also benefit from the work done These best practice protocols will cover the most important technical (laboratory) protocols used, and might be used by MSs to help to set up, strengthen or expand wastewater surveillance for various priority targets. WP7 will focus on the technical laboratory procedures related to and used in wastewater surveillance, including for instance, sampling/transport/biobanking, purification and analytical methods for priority targets as well as Next Generation Sequencing (NGS) and Whole Genome Sequencing (WGS) techniques. Interlaboratory ring-trials and on-site training events will be organized. for interested MSs, especially those with less or no experience, to teach them how to work with the defined best practice protocols. Objectives of WP7 are to: ▪ assess and evaluate the current technical procedures regarding sampling, transportation and biobanking procedures. ▪ assess and evaluate the current technical laboratory procedures of the detection (quantification) of priority targets. ▪ assess and evaluate the current technical procedures regarding advanced sequencing techniques and sequence data analysis. ▪ Generate and disseminate best practices for each of the above objectives to the MSs. ▪ Organize interlaboratory ring trials as well as on-site training events. Activities and division of work (WP description) Task No Task Name Description Participants In-kind Contributions and (continuou Subcontracting s (Yes/No and which) numbering Name Role linked to (COO, BEN, WP) AE, AP, OTHER) T7.1 Evaluation and harmonization of For wastewater surveillance it is important to LIST, ISS, SSI, BEN, COO No sampling, transportation and use good protocols: this task will identify, NIPH, RIVM, NNK, biobanking procedures for target compare and make an inventory of the most Sciensano, THL, pathogens, AMR and chemicals (non- relevant and widely applied sampling, SZU, CIPH, ISCIII, infectious) substances, illicit drugs transportation and biobanking procedures EODY, INSA, and health-related biomarkers (applied for the specific targets). INSP, UCY, HB, 74 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 i) to define the most relevant assessment MLT; AGES, CDPC, criteria for targets in question, based on its IDCU, MPHS; specific characteristics (and the expectations NVSC-LT, of the analytical methods) in the MSs, using an electronic survey. ii) to identify the most appropriate protocols LBMC, CING, and technical approaches for each target used NKUA, UTH, UPAT, AE internationally UOC, MUI, SLU, Terviseamet, TU iii) to disseminate the different procedures (for WIEN, AdP Valor, the different targets) to the MSs BIOR, UCT Prague, UB, RLDWG, UCD, ANSES, USC, UBA, NLZOH, USAL, NVSPL, AUTH, SpFRANCE, Upatras, WDD T7.2 Evaluation and harmonization of This task aims at identifying the laboratory ISS, SSI, LIST, BEN, COO No laboratory procedures procedures used for the specific targets and Sciensano, INSA, includes: NIPH, RIVM, NNK, HSE, THL, SZU, i) a survey will be deployed to identify the used ISCIII, EODY, wastewater surveillance of methodologies, CIPH, RKI, INSP, protocols and technical approaches in the PHAS; HB, MLT; MSs; a questionnaire will be prepared and AGES, IDCU send to laboratories within the EU MSs having established analytical protocols for the detection and quantification of the selected AE targets in wastewater. Laboratories will be ANSES, , NLZOH, questioned about the nature of the NKUA, UCD, implemented analytical procedure by providing NVSPL, CING, the quality controls and the available validation USC, USAL, ,UCY, information according to several topics: the UCT Prague, UPAT, type of sample, the processed and tested UOC, UB, AUTH, volume, the sample handling, if applicable the MUI, NVI, SLU, TU concentration methods, detection and WIEN, UOI, quantification assay; ii) Identification of internationally used protocols and technical approaches by 75 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 performing a comprehensive literature review; and, iii) interlaboratory studies will be performed and on-site training events will be organized for selected priority targets All partners in T7.2 will support activities in developing methodological tools to identify the laboratory procedures used for the specific targets and surveying the used wastewater surveillance methodologies, protocols and technical approaches in the MSs. T7.3 Advanced sequencing techniques and The aim of this task is to evaluate the use of SSI, ISS, INSA, COO, BEN No advanced sequence data analysis sequencing approaches in wastewater LIST, RIVM, surveillance. The task will identify laboratory Sciensano, THL, and data analysis procedures for the SZU, ISCIII, CIPH, sequencing approaches defined in the EODY, RKI, NIPH, subtasks: standardized workflows for PHAS, HB, MLT, reproducible sequencing analyses will be AGES, IDCU developed, along with training on the AE laboratory techniques, bioinformatic analysis NLZOH, UPAT, and possibly on the organization of inter- LBMC, BIOR, laboratory (e.g. in silico) assays. ANSES, SpF, UCD, The task explores the potential of targeted NVSPL, CING, UCT sequencing and metagenomics for screening Prague, UOC, UB, wastewater, detecting and identifying for AUTH, NKUA, NVI, instance pathogens and AMR genes. The use UB, TU WIEN, LNS, and utility of using these approaches will be evaluated, along with the methods and protocols used by MSs, as well as methods described in literature. Milestones and deliverables (outputs/outcomes) Milestone No Milestone Name Work Lead Beneficiary Description Due Date Means of Verification (continuous Package No (month numbering not linked number) to WP) 76 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 MS18 Electronic survey 7 RIVM A survey is conducted among the M12 Survey conducted. on protocols participating MSs to collect technical protocols used in WBS MS19 Inventory of 7 RIVM The available and best practice M18 The key results are made protocols and protocols in wastewater surveillance available to the consortium best practices activities are gathered and participants. disseminated to the participants. MS20 Ring trials and 7 RIVM Interlaboratory studies and on-site M32 Key results are made on-site training training activities are organised. available to the participants activities Deliverable No Deliverable Work Lead Beneficiary Type Dissemination Due Date Description (continuous Name Package No Level (month (including format and language) numbering linked to number) WP) D7.1 Best practices 7 RIVM R PU M34 Guidance document for technical describing technical protocols protocols used in used in wastewater wastewater surveillance. Pdf, English surveillance 77 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Subcontracting Subcontracting Give details on subcontracted project tasks (if any) and explain the reasons why (as opposed to direct implementation by the Beneficiaries/Affiliated Entities). Subcontracting — Subcontracting means the implementation of ‘action tasks’, i.e. specific tasks which are part of the EU grant and are described in Annex 1 of the Grant Agreement. Note: Subcontracting concerns the outsourcing of a part of the project to a party outside the consortium. It is not simply about purchasing goods or services. We normally expect that the participants have sufficient operational capacity to implement the project activities themselves. Subcontracting should therefore be exceptional. Include only subcontracts that comply with the rules (i.e. best value for money and no conflict of interest; no subcontracting of coordinator tasks). Work Package No Subcontract No Subcontract Description Estimated Costs Justification Best-Value-for-Money (continuous Name (including task number and (EUR) (why is subcontracting (how do you intend to numbering linked to (subcontracted BEN/AE to which it is linked) necessary?) ensure it?) WP) action tasks) Subcontractor 1 Given the limited time of WP3 S3.1 Empresa Pública PORTUGAL, AdP, Task 2500 EUR The subcontractor was participation of these entities, das Águas de 3.3, contractor provide identified as the most it would not be efficient to Lisboa, (EPAL) data and feedback efficient pivot to gather essential to the include them in the project the information required confirmation of targets consortium. However, the in the least amount of Consultation to data and knowledge will be time. National needed to contribute to the Wastewater WPs tasks Operators regarding priority targets Subcontractor Given the limited time of WP6 S6.1 2 PORTUGAL, AdP, Task 2500 EUR participation of these entities, The subcontractors were Laboratório de 6.1, contractors are it would not be efficient to identified as the entities S6.1 knowledge holders about that have conducted Analises do include them in the project Instituto appropriate sampling consortium. However the previous works on Superior techniques and statistical data and knowledge will be wastewater analysis, Técnico (IST models for common needed to contribute to the some of them still LAIST) – targets WPs tasks working on this matter sampling (IST) techniques Subcontractor 3 78 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Faculdade de Ciências da Universidade de Lisboa (FCUL) – statistical models WP7 S7.1 Subcontractor PORTUGAL, AdP. Task 10 000 EUR Collection and Subcontractors will be 4, PT company, 7.1 The Subcontractors will transportation of samples selected based on the TBD address sampling for the development of final list of samples and collection and new methods, Pilot locations, based on transportation studies and Ring studies. price. This will need to be address after the list of priority targets has been determined. WP6 S6.1 Subcontractor AUSTRIA, AGES. Task 6.2 40 000 EUR AGES does not have the Selection of 1, IT company The Subcontractor will be relevant expertise for this subcontractors is based instrumental to cover the specific work. The on best-value-for-money. database-related work in company is also This planned Task 6.2. subcontractor of AGES for subcontractor has been database support for the an IT-partner in all national wastewater wastewater-related surveillance and research projects and participant in EU-DEEP programmes since 2020. meetings. 79 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 WP6 S6.2 SLOVENIA, NIJZ 127 200 EUR NIJZ lacks in house NIJZ will follow Subcontra Tasks: T6.2, T6.3 expert for advanced national ctor Modelling and Statistics statistical analysis legislation for 2, Expert will provide and interpretation, tender Modelling his/hers expertise in so we need to hire procedures. An and database-related external expert. open call for Statistics matters and offering Modelling and Expert advanced statistical Statistics Expert guidance. will be published. Modelling and Statistics Expert will be selected on a basis of a transparent procedure which will be launched in order to ensure that an expert with have the proper expertise (detailed terms of references will be prepared. 80 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 WP 6 S 6.3 Subcontractor 1, CROATIA, CIPH, Task 6.2 5.000 EUR CIPH does not have the Selection of a person or The subcontractor will relevant expertise in data subcontractors is based company model epidemiological and modeling on the best value for dealing with analytical data money. CIPH has already data modeling preformed similar type of activities with subcontractors e.g. disinfection by product modeling in drinking water WP7 S 7.1. Subcontractor 2, CROATIA, CIPH, Task 7.2 40.000 EUR CIPH does not have the Selection of IT company and 7.3 The subcontractor relevant expertise for this subcontractors is based will cover the data-base- specific work and has on the best value for related work in tasks in already used a money. CIPH has already WP7 (existing data base subcontractor to develop a had an IT partner as a needs to be upgraded to national database for SARS- subcontractor in previous allow data collection of all CoV-2 waste water research pathogens and chemicals projects related to SARS- that will be part of the CoV-2 project; existing data base is used only for SAR-CoV-2) WP7 S 7.2 Subcontractor 2, CROATIA, CIPH, Tasks 7.2 6.000 EUR CIPH will perform sampling Selection of laboratory and 7.3. The subcontractor for pilot sites; however, in subcontractors is based accredited for will cover sampling issue in certain cases, the on the best value for wastewater occasions when CIPH is not subcontractor will be money. CIPH has already sampling able to cover several events needed for specific used a subcontractor for on the same day or to reach purposes and access to specific sampling specific objects. specific objects and time activities in order to cover events (e.g. when sampling several sites on the same needs to be performed on day or for sampling of the same day at different specific objects. locations) 81 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 WP7 S7.3 External UCY, Cyprus. Task 7.2 . The 5.000,00 EUR The amount has been The selection of the metagenomic subcontracting of allocated for the payment of subcontracting facility will sequencing metagenomic analyses of conduction of analytical be based on best-value-for- facility specific wastewater samples, measurements such as money for the conduction will be instrumental to cover metagenomic sequencing for of metagenomic the database-related work in the improvement of sequencing on the Task 7.2. Evaluation and laboratory methodologies optimum number of harmonization of laboratory and protocols towards the samples towards UCY procedures. full harmonization of UCY laboratory procedure laboratory procedures. evaluation and harmonization. Other issues: Five partners have expressed subcontracting needs. Justifications are provided for four of them above. Subcontracting has been requested for activities for which expertise is not available in house. If subcontracting for the project goes beyond 30% of the total eligible costs, give specific reasons. Subcontracting is not used for management or other core activities. 82 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Timetable Timetable (projects of more than 2 years) Fill in cells in beige to show the duration of activities. Repeat lines/columns as necessary. Note: Use actual calendar years and quarters. In the timeline you should indicate the timing of each activity per WP. You may add additional columns if your project is longer than 6 years. YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 ACTIVITY Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q Q 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Task 1.1 M M D Task 1.2 Task 1.3 D Task 2.1 MD Task 2.2 M Task 2.3 M M D D Task 2.4 M D Task 3.1 M D Task 3.2 Task 3.3 M D Task 4.1 Task 4.2 M D 83 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Task 4.3 M D Task 4.4 Task 4.5 Task 5.1 M D Task 5.2 M M Task 5.3 Task 5.4 Task 5.5 Task 5.6 Task 5.7 Task 6.1 M D Task 6.2 M M Task 6.3 Task 7.1 M D Task 7.2 M Task 7.3 M #§WRK-PLA-WP§# 84 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 #@ETH-ICS-EI@# 5. OTHER 5.1 Ethics Ethics If the Call document contains a section on ethics, describe ethics issues that may arise during the project implementation and the measures you intend to take to solve/avoid them. Among the advantages of wastewater surveillance, is the fact that ethical issues are normally considered to be minor in so far as the analysis is made at the population level and test results cannot be traced back to individuals. GDPR issues rarely applies. For this reason, we have chosen in this proposal not to describe ethical issues at length. However, we are aware that there may be special applications in which wastewater surveillance can be set up in closer proximity to individuals; if it for instance targets individual buildings rather than whole cities. This is not foreseen to be covered by EU-WISH, however should it be, relevant ethical considerations will be made. Wastewater surveillance may contain sensitive information when merged into other, parent, surveillance systems. These will be addressed similar to those of the parent systems. Issues in relation to data storing and sharing will be considered in WP1 and addressed in the Data Management Plan. #§ETH-ICS-EI§# #@SEC-URI-SU@# 5.2 Security Security If the Call document contains a section on security, describe security issues that may arise during the project implementation and the measures you intend to take to solve/avoid them. Indicate if there is need for EU classification of information (Decision 2015/444) or any other specific security measures. Insert text #§SEC-URI-SU§# #@DEC-LAR-DL@# 6. DECLARATIONS Higher funding rate (if applicable) YES/NO Do you fulfil the conditions set out in the Call document for a higher funding rate? YES If YES, explain and provide details. The project is of exceptional utility: the consortium includes more than 14 Member States and more than four of them have GNI per inhabitant less than 90% of the EU average. Double funding Information concerning other EU grants for this project Please note that there is a strict prohibition of double funding from the EU budget (except YES/NO under EU Synergies actions). We confirm that to our best knowledge neither the project as a whole nor any parts of it have YES benefitted from any other EU grant (including EU funding managed by authorities in EU 85 Call: EU4H-2023-JA-IBA-02 — (CP-g-23-18) — Direct grants to Member States’ authorities: to enhance, extend and consolidate wastewater surveillance for public health (HERA) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 EU Grants: Application form (EU4H): V2.0 – 01.06.2022 Member States or other funding bodies, e.g. EU Regional Funds, EU Agricultural Funds, etc). If NO, explain and provide details. We confirm that to our best knowledge neither the project as a whole nor any parts of it are YES (nor will be) submitted for any other EU grant (including EU funding managed by authorities in EU Member States or other funding bodies, e.g. EU Regional Funds, EU Agricultural Funds, etc). If NO, explain and provide details. Financial support to third parties (if applicable) If in your project the maximum amount per third party will be more than the threshold amount set in the Call document, justify and explain why the higher amount is necessary in order to fulfil your project’s objectives. Insert text #§DEC-LAR-DL§# ANNEXES LIST OF ANNEXES Standard Detailed budget table (annex 1 to Part B) — mandatory CVs (annex 2 to Part B) — mandatory, if required in the Call document Annual activity reports (annex 3 to Part B) — mandatory, if required in the Call document List of previous projects (annex 4 to Part B) — mandatory, if required in the Call document Special Other annexes (annex X to Part B) — mandatory, if required in the Call document HISTORY OF CHANGES PUBLICATION VERSION CHANGE DATE 1.0 15.04.2021 Initial version (new MFF). 2.0 01.06.2022 Consolidation, formatting and layout changes. Tags added. 86 CONSOLIDATED COSTS Associated with document Ref. Ares(2023)8598037 - 14/12/2023 PROJECT COSTS A.1 Employees D. Other cost C. Purchase costs A.2 + A.3 Natural categories B. Subcontracting E. Indirect costs persons under direct A.4 SME owners costs D.1 Financial contract and seconded C.1 Travel and C.3 Other goods, persons subsistence C.1 Travel C.1 Accommodation C.1 Subsistence C.2 Equipment works and services support to third Total parties a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 #REFERENCE! SSI TOTAL COSTS PARTICIPANT 1.734.800,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 54.400,00 0,00 125.807,92 1.923.063,92 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) EODY TOTAL COSTS PARTICIPANT 609.700,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 7.500,00 71.000,00 0,00 48.737,92 744.993,92 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) UTH TOTAL COSTS PARTICIPANT 129.250,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 22.000,00 0,00 11.151,42 170.457,42 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) AUTH TOTAL COSTS PARTICIPANT 240.250,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 2.000,00 13.000,00 0,00 18.431,42 281.737,42 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) NKUA TOTAL COSTS PARTICIPANT 159.797,50 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 20.000,00 0,00 13.149,78 201.003,28 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) Upatras TOTAL COSTS PARTICIPANT 57.000,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 1.500,00 13.000,00 0,00 5.568,92 85.124,92 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) UoC TOTAL COSTS PARTICIPANT 61.800,00 0,00 0,00 2.017,00 739,00 665,00 613,00 2.000,00 15.000,00 0,00 5.657,19 86.474,19 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) UOI TOTAL COSTS PARTICIPANT 64.000,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 11.000,00 0,00 5.813,92 88.869,92 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) AGES TOTAL COSTS PARTICIPANT 423.600,00 0,00 40.000,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 21.000,00 0,00 34.485,92 527.141,92 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) MUI TOTAL COSTS PARTICIPANT 49.000,00 0,00 0,00 6.042,00 2.214,00 1.992,00 1.836,00 0,00 12.000,00 0,00 4.692,94 71.734,94 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) TU WIEN TOTAL COSTS PARTICIPANT 29.006,00 0,00 0,00 6.042,00 2.214,00 1.992,00 1.836,00 0,00 10.000,00 0,00 3.153,36 48.201,36 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) Sciensano TOTAL COSTS PARTICIPANT 624.500,00 0,00 0,00 32.281,00 9.963,00 12.118,00 10.200,00 0,00 105.000,00 0,00 53.324,67 815.105,67 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) CIPH TOTAL COSTS PARTICIPANT 228.160,90 0,00 51.000,00 8.056,00 2.952,00 2.656,00 2.448,00 72.000,00 199.000,00 0,00 39.075,19 597.292,09 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) MPHS CY Associated with document Ref. Ares(2023)8598037 - 14/12/2023 TOTAL COSTS PARTICIPANT 45.657,64 0,00 0,00 7.038,00 2.214,00 2.988,00 1.836,00 0,00 6.045,00 0,00 4.111,87 62.852,51 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) UCY TOTAL COSTS PARTICIPANT 179.886,00 0,00 5.000,00 4.360,00 1.476,00 1.660,00 1.224,00 0,00 6.453,00 0,00 13.698,93 209.397,93 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) CING TOTAL COSTS PARTICIPANT 114.194,50 0,00 0,00 7.038,00 2.214,00 2.988,00 1.836,00 0,00 7.454,00 0,00 9.008,09 137.694,59 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) MoA-CY TOTAL COSTS PARTICIPANT 10.064,39 0,00 0,00 7.038,00 2.214,00 2.988,00 1.836,00 0,00 0,00 0,00 1.197,14 18.299,53 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) SZU TOTAL COSTS PARTICIPANT 210.005,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 111.000,00 0,00 23.034,27 352.095,27 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) UCT TOTAL COSTS PARTICIPANT 188.985,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 37.200,00 0,00 16.396,87 250.637,87 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) HB TOTAL COSTS PARTICIPANT 110.200,80 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 246.000,00 0,00 25.497,99 389.754,79 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) THL TOTAL COSTS PARTICIPANT 813.818,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 81.000,00 0,00 63.201,18 966.075,18 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) DGS-FR TOTAL COSTS PARTICIPANT 80.500,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 4.000,00 0,00 6.478,92 99.034,92 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) SpFrance TOTAL COSTS PARTICIPANT 378.714,61 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 17.000,00 0,00 28.263,97 432.034,58 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) ANSES TOTAL COSTS PARTICIPANT 342.584,50 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 9.166,67 150.000,00 0,00 35.686,50 545.493,67 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) RKI TOTAL COSTS PARTICIPANT 492.138,50 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 6.000,00 0,00 35.433,65 541.628,15 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) UBA TOTAL COSTS PARTICIPANT 106.862,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 60.000,00 0,00 12.244,26 187.162,26 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) NNGYK TOTAL COSTS PARTICIPANT 250.600,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 16.000,00 261.000,00 0,00 37.494,92 573.150,92 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) HSE TOTAL COSTS PARTICIPANT 150.968,68 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 6.000,00 0,00 11.551,55 176.576,23 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) UCD TOTAL COSTS PARTICIPANT 267.639,60 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 6.000,00 0,00 19.718,72 301.414,32 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) UÉ TOTAL COSTS PARTICIPANT 52.258,32 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 6.000,00 0,00 4.641,98 70.956,30 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) ISS TOTAL COSTS PARTICIPANT 181.497,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 216.137,00 0,00 28.398,30 434.088,30 (Proposal Step) TOTAL COSTS PARTICIPANT Associated with document Ref. Ares(2023)8598037 - 14/12/2023 0,00 (Grant Preparation Step) IT MOH TOTAL COSTS PARTICIPANT 11.750,00 0,00 0,00 7.049,00 2.583,00 2.324,00 2.142,00 0,00 0,00 0,00 1.315,93 20.114,93 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) FBK TOTAL COSTS PARTICIPANT 69.293,00 0,00 0,00 5.035,00 1.845,00 1.660,00 1.530,00 0,00 3.500,00 0,00 5.447,96 83.275,96 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) RLDGW TOTAL COSTS PARTICIPANT 75.576,09 0,00 0,00 7.049,00 2.583,00 2.324,00 2.142,00 0,00 9.000,00 0,00 6.413,75 98.038,84 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) CDPC TOTAL COSTS PARTICIPANT 59.420,50 0,00 0,00 12.073,00 4.059,00 4.648,00 3.366,00 0,00 4.255,92 0,00 5.302,46 81.051,88 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) BIOR TOTAL COSTS PARTICIPANT 128.979,50 0,00 0,00 3.824,00 1.476,00 1.328,00 1.020,00 0,00 129.502,00 0,00 18.361,42 280.666,92 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) LBMC TOTAL COSTS PARTICIPANT 111.250,00 0,00 0,00 4.028,00 1.476,00 1.328,00 1.224,00 0,00 121.000,00 0,00 16.539,46 252.817,46 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) NVSC-LT TOTAL COSTS PARTICIPANT 103.769,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 0,00 0,00 7.827,75 119.652,75 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) NVSPL-LT TOTAL COSTS PARTICIPANT 46.170,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 75.000,00 0,00 9.045,82 138.271,82 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) LIST TOTAL COSTS PARTICIPANT 504.845,66 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 20.182,00 0,00 37.315,86 570.399,52 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) LNS TOTAL COSTS PARTICIPANT 177.000,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 0,00 0,00 12.953,92 198.009,92 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) IDCU TOTAL COSTS PARTICIPANT 227.749,48 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 24.000,00 363.000,00 0,00 43.596,35 666.401,83 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) RIVM TOTAL COSTS PARTICIPANT 839.984,75 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 21.000,00 0,00 60.832,87 929.873,62 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) NIPH TOTAL COSTS PARTICIPANT 554.499,50 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 13.000,00 0,00 40.288,92 615.844,42 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) NVI TOTAL COSTS PARTICIPANT 104.216,40 0,00 0,00 7.343,00 2.583,00 2.822,00 1.938,00 0,00 0,00 0,00 7.809,16 119.368,56 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) INSA TOTAL COSTS PARTICIPANT 179.102,17 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 6.289,00 60.170,00 0,00 17.753,19 271.370,36 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) DGS TOTAL COSTS PARTICIPANT 105.965,73 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 1.125,00 6.000,00 0,00 8.480,27 129.627,00 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) AdP VALOR TOTAL COSTS PARTICIPANT 95.912,55 0,00 15.000,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 4.000,00 0,00 8.607,83 131.576,38 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) INSP Associated with document Ref. Ares(2023)8598037 - 14/12/2023 TOTAL COSTS PARTICIPANT 399.745,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 23.990,40 50.340,00 0,00 33.749,17 515.880,57 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) NIJZ TOTAL COSTS PARTICIPANT 309.500,00 0,00 127.200,00 8.056,00 2.952,00 2.656,00 2.448,00 4.000,00 17.000,00 0,00 32.602,92 498.358,92 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) NLZOH TOTAL COSTS PARTICIPANT 84.600,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 2.000,00 0,00 6.625,92 101.281,92 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) ISCIII TOTAL COSTS PARTICIPANT 155.812,50 0,00 0,00 7.049,00 2.583,00 2.324,00 2.142,00 0,00 8.000,00 0,00 11.960,34 182.821,84 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) AEMPS TOTAL COSTS PARTICIPANT 16.250,00 0,00 0,00 6.042,00 2.214,00 1.992,00 1.836,00 0,00 5.000,00 0,00 1.910,44 29.202,44 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) UB TOTAL COSTS PARTICIPANT 71.925,00 0,00 0,00 6.042,00 2.214,00 1.992,00 1.836,00 0,00 4.200,00 0,00 5.751,69 87.918,69 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) USC TOTAL COSTS PARTICIPANT 66.700,00 0,00 0,00 4.028,00 1.476,00 1.328,00 1.224,00 0,00 2.000,00 0,00 5.090,96 77.818,96 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) USAL TOTAL COSTS PARTICIPANT 21.144,44 0,00 0,00 3.021,00 1.107,00 996,00 918,00 0,00 1.200,00 0,00 1.775,55 27.140,99 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) PHAS TOTAL COSTS PARTICIPANT 471.600,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 6.000,00 0,00 33.995,92 519.651,92 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) SLU TOTAL COSTS PARTICIPANT 25.720,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 0,00 0,00 2.364,32 36.140,32 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) UPHC TOTAL COSTS PARTICIPANT 296.001,82 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 226.474,00 0,00 37.137,24 567.669,06 (Proposal Step) TOTAL COSTS PARTICIPANT 0,00 (Grant Preparation Step) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 START (DETAILED BUDGET TABLE (AG) — PROPOSAL/GRANT PREPARATION) PROJECT DATA Project number: 101140460 Project acronym: EU-WISH Participant short name: AdP Valor Participant PIC: 984102346 WORK PACKAGES & TRAVELS Index Name Description Number of travels Delete 1 WP1 Description 1 3 2 WP2 Description 2 3 WP3 Description 3 4 WP4 Description 4 5 WP5 Description 5 6 WP6 Description 6 7 WP7 Description 7 a Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 11-12-2023 13:13 Project acronym: EU-WISH Participant short name: AdP Valor Participant PIC: 984102346 ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity) ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR. ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP. ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically. ACTION GRANT BUDGET TABLE (PER PARTICIPANT) PROJECT COSTS A. Personnel costs Costs (actual or unit costs) Time Rate Total Also working for other work ! monthly rates allowed for budgeting because simpler to establish the approximate costs; cost reporting will have (months/other of work on Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities to be done according to MGA (usually daily rates) the action) (monthly/other) WP a b c=a*b WORK PACKAGE 1 WP1 A.1 Employees (or equivalent) Project manager will organise and manage the other Project managers monthly 3.612,00 0,25 903,00 YES. All WP personnel working on WP1 and across WPs. Scientific coordinator, responsible for overall scientific Senior experts/advisors/researchers monthly 7.593,00 0,25 1.898,25 YES, WP4, WP5, WP6, WP7 management of the project for Adp Valor Assistant of scientific coordinator. Financial & administrat. YES, WP2, WP4, WP5, WP6, officer; project administration, monitoring project Administrative personnel monthly 3.342,00 0,15 501,30 WP7 expenses, preparation of financial reports. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 3.302,55 A.2 + A.3 Natural persons under direct contract and seconded persons monthly 0,00 monthly 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 3.302,55 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 WORK PACKAGE 2 WP2 A.1 Employees (or equivalent) Project manager, Contribution in the development of the final report and outreach, communication and dissemination activities that will take place during the Project managers monthly 3.612,00 1,00 3.612,00 YES. All WP project aim at reaching multiple audiences and include gathering and consolidation of information about the project, disseminating the information through the communication channels Contribution in the development of the final report YES, WP1, WP4, WP5, WP6, Administrative personnel monthly 3.342,00 0,50 1.671,00 summarising the communication and dissemination WP7 activities of EU-WISH. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 5.283,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 5.283,00 WORK PACKAGE 3 WP3 A.1 Employees (or equivalent) Project manager, evaluation of risk and sensibility in data transmission, and development of recommendations Project managers monthly 3.612,00 2,00 7.224,00 YES. All WP and procedures for the integration of wastewater surveillance into public health preparedness plans Participation in the work and preparation of documents about evaluation of risk and sensibility in data transmission, and quantifying the Key Performance Senior experts/advisors/researchers monthly 9.680,00 1,00 9.680,00 YES, WP5 Indicators at the project’s beginning and end, and contributing to the design and implementation of the survey of the success of EU-WISH . Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 16.904,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary Associated with document Ref. Ares(2023)8598037 - 14/12/2023 SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 16.904,00 WORK PACKAGE 4 WP4 A.1 Employees (or equivalent) Project manager. Business and operation model, cross project coordination. Supporting the creation of a Project managers monthly 3.612,00 5,00 18.060,00 YES. All WP strategy plan, roles, responsibilities, and roadmap for establishing capacity development, exchange of experience, networking etc. Scientific coordinator, responsible for overall scientific management of the project and T4.2 deploying a Senior experts/advisors/researchers monthly 7.593,00 1,00 7.593,00 YES, WP1, WP5, WP6, WP7 technlogical roadmap for the integration of wastewater surveillance in national policies and improve cooperation mechanisms between EU Member states Participation in the work and preparation of documents, YES, WP1, WP2, WP5, WP6, Administrative personnel monthly 3.342,00 0,50 1.671,00 handling compliance to the WP4 related topics. WP7 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 27.324,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 27.324,00 WORK PACKAGE 5 WP5 A.1 Employees (or equivalent) Project manager, T5.1 mapping previous activities performed on the topic of wastewater surveillance in Project managers monthly 3.612,00 3,00 10.836,00 YES. All WP Portugal. T5.2 Identification of surveillance targets after Urban Wastewater Treatment Directive revision T5.1 mapping previous activities performed on the topic of wastewater surveillance in Portugal. T5.2 Identification Senior experts/advisors/researchers monthly 9.680,00 0,50 4.840,00 YES, WP3 of surveillance targets after Urban Wastewater Treatment Directive revision Mapping previous activity. Identification of surveillance targets after Urban Wastewater Treatment Directive Senior experts/advisors/researchers monthly 7.593,00 1,00 7.593,00 YES, WP1, WP4, WP6, WP7 revision. Participating in workshops and contributing to production of T5.1 survays. YES, WP1, WP2, WP4, WP6, Participation in the work and preparation of documents Administrative personnel monthly 3.342,00 0,50 1.671,00 WP7 and reporting activities. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 24.940,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 24.940,00 WORK PACKAGE 6 WP6 A.1 Employees (or equivalent) Project manager, Contribution in the design of guidelines Project managers monthly 3.612,00 1,00 3.612,00 YES. All WP for wastewater sampling and cross wp project management. Participation in the work and preparation of documents. Contribution in the design of guidelines for wastewater sampling strategies in cities/metropolitan areas, as well Senior experts/advisors/researchers monthly 7.593,00 0,50 3.796,50 YES, WP1, WP4, WP5, WP7 as in specific settings of special interest such as settlements of populations with low vaccination coverage, healthcare facilities etc. YES, WP1, WP2, WP4, WP5, Participation in the work and preparation of documents Administrative personnel monthly 3.342,00 0,50 1.671,00 WP7 and reporting activities. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 9.079,50 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 9.079,50 WORK PACKAGE 7 WP7 A.1 Employees (or equivalent) Project manager, Wastewater sampling, transportation, Project managers monthly 3.612,00 1,00 3.612,00 YES. All WP supporting collaboration with other partners in WP7 activities. Participation in the work and preparation of documents. Wastewater sampling, transportation and biobanking YES, WP1, WP4, WP5, WP6, Senior experts/advisors/researchers monthly 7.593,00 0,50 3.796,50 procedures for target pathogens, AMR and chemicals (non- WP7 infectious) substances, illicit drugs and health-related biomarkers. YES, WP1, WP2, WP4, WP5, Participation in the work and preparation of documents Administrative personnel monthly 3.342,00 0,50 1.671,00 WP6 and supporting reporting activites Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 9.079,50 A.2 + A.3 Natural persons under direct contract and seconded persons Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 9.079,50 Total personnel (all WPs) 95.912,55 B. Subcontracting costs Also used for other work Costs packages? Description of subcontracted project tasks/activities (actual costs) YES/NO and which WP WORK PACKAGE 1 WP1 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 2 WP2 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 3 WP3 YES, WP6, WP7 Meetings, assessment, information gathering 1 information cunsulting 2.500,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 2.500,00 WORK PACKAGE 4 WP4 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 5 WP5 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 6 WP6 YES, WP3, WP7 Meetings, assessment, information gathering 1 information cunsulting 2.500,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 2.500,00 WORK PACKAGE 7 WP7 YES, WP3, WP6 Collection and transportation of samples for the development of new Associated withmethods, documentPilot studies and Ring - 14/12/2023 Ref. Ares(2023)8598037 1 sample management 10.000,00 studies. Subcontractors will be selected based on the final list of samples and locations, based on price. This will need to be address after the list of priority targets has been determined. 2 [Subcontract short name] 0,00 Total subcontracting for this WP 10.000,00 Total subcontracting (all WPs) 15.000,00 C. Purchase costs C.1 Travel and subsistence Costs Description (e.g. international/not international; place of Costs (unit cost) Also part of other work activity/destination; number of days; number of persons (actual costs) packages? (speakers, personnel and participants whose costs are Amount per Total YES/NO and which WP covered); transport means; average price per person; Number of units unit ( EUR) subsistence costs/daily allowances) WORK PACKAGE 1 WP1 1 Kick-off meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 2 persons, travel to Brussels Travel costs 0,00 369,00 2,00 738,00 no 2 persons, 2 hotel nights each, Brussels Accommodation costs 0,00 166,00 4,00 664,00 no 2 persons, 3 days each, Brussels Subsistence costs 0,00 102,00 6,00 612,00 no Total travel costs for this travel 738,00 Total accommodation costs for this travel 664,00 Total subsistence costs for this travel 612,00 Total travel 2.014,00 2 Project meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 4 persons, travel in Europe Travel costs 0,00 369,00 4,00 1.476,00 no 4 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 8,00 1.328,00 no 4 persons, 3 days each, Europe Subsistence costs 0,00 102,00 12,00 1.224,00 no Total travel costs for this travel 1.476,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total accommodation costs for this travel 1.328,00 Total subsistence costs for this travel 1.224,00 Total travel 4.028,00 3 Final meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 2 persons, travel in Europe Travel costs 0,00 369,00 2,00 738,00 no 2 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 4,00 664,00 no 2 persons, 3 days each, Europe Subsistence costs 0,00 102,00 6,00 612,00 no Total travel costs for this travel 738,00 Total accommodation costs for this travel 664,00 Total subsistence costs for this travel 612,00 Total travel 2.014,00 Total travel costs for this WP 2.952,00 Total accommodation costs for this WP 2.656,00 Total subsistence costs for this WP 2.448,00 Total travel for this WP 8.056,00 0,00 WORK PACKAGE 2 WP2 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 3 WP3 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 4 WP4 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 5 WP5 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 6 WP6 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 7 WP7 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 Total travel costs (all WPs) 2.952,00 Total accommodation (all WPs) 2.656,00 Total subsistence (all WPs) 2.448,00 Total travel and subsistence (all WPs) 8.056,00 C.2 Equipment WORK PACKAGE 1 WP1 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 2 WP2 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 3 WP3 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 4 WP4 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 5 WP5 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 6 WP6 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 7 WP7 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a Associated with document Ref. Ares(2023)8598037 - 14/12/2023 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 Total equipment (all WPs) 0,00 C.3 Other goods, works and services WORK PACKAGE 1 WP1 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 no Final audit certificate for grants >430.000 Euro (the value 3 Audit fees (CFS) 4.000,00 in the working template was not updated). 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 4.000,00 WORK PACKAGE 2 WP2 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total goods, works and services for this WP 0,00 WORK PACKAGE 3 WP3 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 4 WP4 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 5 WP5 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 6 WP6 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 7 WP7 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 Total goods, works and services (all WPs) 4.000,00 Total purchase costs (all WPs) 12.056,00 D. Other cost categories D.1. Financial support to third parties WORK PACKAGE 1 WP1 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 2 WP2 Also used for other work Description of support scheme (estimated number of packages? recipients; maximum amount per recipient) YES/NO and which WP Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) - 14/12/2023 (actual costs) Associated with document Ref. Ares(2023)8598037 YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 3 WP3 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 4 WP4 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 5 WP5 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 6 WP6 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 7 WP7 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 0,00 Total other cost category D.1 for this WP 0,00 Total D.1 (all WPs) 0,00 Total other cost categories (all WPs) 0,00 E. Indirect costs Costs (flat-rate) Total estimated direct costs (on which indirect cost flat-rate is based, 122.968,55 see GA eligibility article) ALL WORK PACKAGES Flat-rate (%) 7% ATTENTION! Check that the rate is in line with the call conditions. Put 0% if you receive an EU Operating Grant and are not eligible to charge indirect costs” Total indirect costs 8.607,80 Total indirect costs 8.607,80 TOTAL COSTS PARTICIPANT 131.576,35 PROJECT INCOME EU CONTRIBUTION (GRANT) Amount (EUR) Total costs 131.576,35 Single Funding rate (%) 80% ATTENTION! Enter funding rate from the call conditions. Maximum EU contribution 105.261,08 Requested EU contribution 105.261,07 ATTENTION❗ In order to avoid rounding issues, please request 1 cent less than the maximum EU contribution. EU CONTRIBUTION 105.261,07 REVENUES AND CONTRIBUTIONS BY THIRD PARTIES Revenues Income generated by the action Amount Description of the income (type of generated income and (EUR) number of users, etc) ALL WORK PACKAGES Estimated income generated by the action 0,00 Total income generated by the action 0,00 Revenues 0,00 In-kind contributions by third parties In-kind contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose etc) ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total in-kind contributions 0,00 In-kind contributions 0,00 Financial contributions by third parties Financial contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose, etc) ALL WORK PACKAGES Estimated financial contributions by third parties 0,00 Total financial contributions 0,00 Financial contributions 0,00 TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00 OWN RESOURCES Amount (EUR) Own resources 26.315,28 OWN RESOURCES 26.315,28 TOTAL INCOME PARTICIPANT 131.576,35 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 Project acronym: EU-WISH Participant short name: AdP Valor Participant PIC: 984102346 CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT) COSTS PER WORK PACKAGE A.1 Employees C. Purchase costs D. Other cost categories A.2 + A.3 Natural persons B. Subcontracting E. Indirect costs under direct contract and A.4 SME owners costs Total seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to C.1 Travel C.1 Accommodation C.1 Subsistence C.2 Equipment subsistence work and services third parties e = flat-rate * (a1 + a2 + a3 + a5 + b [+ a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1 + d2 + d3 + d4 + d5 + d6) WP1 WP1 3.302,55 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 4.000,00 0,00 15.358,55 WP2 WP2 5.283,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 5.283,00 WP3 WP3 16.904,00 0,00 2.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 19.404,00 WP4 WP4 27.324,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 27.324,00 WP5 WP5 24.940,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 24.940,00 WP6 WP6 9.079,50 0,00 2.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 11.579,50 WP7 WP7 9.079,50 0,00 10.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 19.079,50 TOTAL COSTS PARTICIPANT 95.912,55 0,00 15.000,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 4.000,00 0,00 8.607,80 131.576,35 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 START (DETAILED BUDGET TABLE (AG) — PROPOSAL/GRANT PREPARATION) PROJECT DATA Project number: 101140460 Project acronym: EU-WISH Participant short name: AEMPS Participant PIC: 999563952 WORK PACKAGES & TRAVELS Index Name Description Number of travels Delete 1 WP1 Description 1 3 2 WP2 Description 2 3 WP3 Description 3 4 WP4 Description 4 5 WP5 Description 5 6 WP6 Description 6 7 WP7 Description 7 a Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 08-12-2023 10:33 Project acronym: EU-WISH Participant short name: AEMPS Participant PIC: 999563952 ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity) ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR. ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP. ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically. ACTION GRANT BUDGET TABLE (PER PARTICIPANT) PROJECT COSTS A. Personnel costs Costs (actual or unit costs) Time Rate Total Also working for other work ! monthly rates allowed for budgeting because simpler to establish the approximate costs; cost reporting will have (months/other of work on Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities to be done according to MGA (usually daily rates) the action) (monthly/other) WP a b c=a*b WORK PACKAGE 1 WP1 A.1 Employees (or equivalent) Member of the european projects office. Coordination of the participation of the AEMPS in the JA. Management of Project managers monthly 4.800,00 1,00 4.800,00 no the gorizontal alignment of the different WPs as well as towards other stakeholders. Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 4.800,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 4.800,00 WORK PACKAGE 2 WP2 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 A.1 Employees (or equivalent) Dissemination activities of activities related to AMR surveillance in relation to T2.3 especially ensuring the Junior experts/advisors/researchers monthly 4.100,00 0,50 2.050,00 Yes, WP5 Open Access to the project outcomes. Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 2.050,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 2.050,00 WORK PACKAGE 3 WP3 A.1 Employees (or equivalent) Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 0,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 0,00 WORK PACKAGE 4 WP4 A.1 Employees (or equivalent) Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other Associated with document Ref. Ares(2023)8598037 - 14/12/2023 [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 0,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 0,00 WORK PACKAGE 5 WP5 A.1 Employees (or equivalent) Member of the Spanish NAP on AMR in the Environmental Area. Participation in WP5 in Wastewater analysis-based AMR surveillance. With emphasis on T5.7 creating a list of Senior experts/advisors/researchers monthly 5.300,00 1,00 5.300,00 no chemical substances and metabolites, as well as health- related biomarkers will be created according to their consideration as the most relevant. Member of the Spanish NAP on AMR in the Environmental Area. Participation in WP5 in Wastewater analysis-based AMR surveillance. With emphasis on T5.1, Identification Junior experts/advisors/researchers monthly 4.100,00 1,00 4.100,00 Yes, WP2 and analysis of relevant actors, authorities and stakeholders; in a survey to collect information on the status of wastewater surveillance activities and prior experiences, existing data sources, and format of data. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 9.400,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 9.400,00 WORK PACKAGE 6 WP6 A.1 Employees (or equivalent) Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 0,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 0,00 WORK PACKAGE 7 WP7 A.1 Employees (or equivalent) Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 0,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 0,00 Total personnel (all WPs) 16.250,00 B. Subcontracting costs Also used for other work Costs packages? Description of subcontracted project tasks/activities (actual costs) YES/NO and which WP WORK PACKAGE 1 WP1 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total subcontracting for this WP 0,00 WORK PACKAGE 2 WP2 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 3 WP3 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 4 WP4 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 5 WP5 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 6 WP6 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 7 WP7 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 Total subcontracting (all WPs) 0,00 C. Purchase costs C.1 Travel and subsistence Costs Description (e.g. international/not international; place of Costs (unit cost) Also part of other work activity/destination; number of days; number of persons (actual costs) packages? (speakers, personnel and participants whose costs are Amount per Total YES/NO and which WP covered); transport means; average price per person; Number of units unit ( EUR) subsistence costs/daily allowances) WORK PACKAGE 1 WP1 1 Kick-off meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants Associated with document Ref. Ares(2023)8598037 - 14/12/2023 2 persons, travel in Europe Travel costs 0,00 369,00 2,00 738,00 no 2 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 4,00 664,00 no 2 persons, 3 days each, Europe Subsistence costs 0,00 102,00 6,00 612,00 no Total travel costs for this travel 738,00 Total accommodation costs for this travel 664,00 Total subsistence costs for this travel 612,00 Total travel 2.014,00 2 Project meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 2 persons, travel to Brussels Travel costs 0,00 369,00 2,00 738,00 no 2 persons, 2 hotel nights each, Brussels Accommodation costs 0,00 166,00 4,00 664,00 no 2 persons, 3 days each, Brussels Subsistence costs 0,00 102,00 6,00 612,00 no Total travel costs for this travel 738,00 Total accommodation costs for this travel 664,00 Total subsistence costs for this travel 612,00 Total travel 2.014,00 3 Final meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 2 persons, travel in Europe Travel costs 0,00 369,00 2,00 738,00 no 2 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 4,00 664,00 no 2 persons, 3 days each, Europe Subsistence costs 0,00 102,00 6,00 612,00 no Total travel costs for this travel 738,00 Total accommodation costs for this travel 664,00 Total subsistence costs for this travel 612,00 Total travel 2.014,00 Total travel costs for this WP 2.214,00 Total accommodation costs for this WP 1.992,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total subsistence costs for this WP 1.836,00 Total travel for this WP 6.042,00 0,00 WORK PACKAGE 2 WP2 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 3 WP3 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 4 WP4 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 5 WP5 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 6 WP6 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 7 WP7 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 Total travel costs (all WPs) 2.214,00 Total accommodation (all WPs) 1.992,00 Total subsistence (all WPs) 1.836,00 Total travel and subsistence (all WPs) 6.042,00 C.2 Equipment WORK PACKAGE 1 WP1 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 2 WP2 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 3 WP3 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) Description of tasks/activities for which the equipment is packages? YES/NO and which needed WP a b c d= a*b*c Associated with document Ref. Ares(2023)8598037 - 14/12/2023 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 4 WP4 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 5 WP5 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 6 WP6 C.2.1 Purchase (depreciation/full cost) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 7 WP7 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 Total equipment (all WPs) 0,00 C.3 Other goods, works and services WORK PACKAGE 1 WP1 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 yes all Dissemination Costs, Open Access publications, Information & publications 5.000,00 translation Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 5.000,00 WORK PACKAGE 2 WP2 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 3 WP3 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 4 WP4 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 5 WP5 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 6 WP6 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 7 WP7 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 Total goods, works and services (all WPs) 5.000,00 Total purchase costs (all WPs) 11.042,00 D. Other cost categories D.1. Financial support to third parties WORK PACKAGE 1 WP1 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 2 WP2 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 3 WP3 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 4 WP4 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 5 WP5 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 6 WP6 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 7 WP7 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 Total D.1 (all WPs) 0,00 Total other cost categories (all WPs) 0,00 E. Indirect costs Costs (flat-rate) Total estimated direct costs (on which indirect cost flat-rate is based, 27.292,00 see GA eligibility article) ALL WORK PACKAGES Flat-rate (%) 7% ATTENTION! Check that the rate is in line with the call conditions. Put 0% if you receive an EU Operating Grant and are not eligible to charge indirect costs” Total indirect costs 1.910,44 Total indirect costs 1.910,44 TOTAL COSTS PARTICIPANT 29.202,44 PROJECT INCOME EU CONTRIBUTION (GRANT) Amount (EUR) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total costs 29.202,44 Single Funding rate (%) 80% ATTENTION! Enter funding rate from the call conditions. Maximum EU contribution 23.361,95 Requested EU contribution 23.361,94 ATTENTION❗ In order to avoid rounding issues, please request 1 cent less than the maximum EU contribution. EU CONTRIBUTION 23.361,94 REVENUES AND CONTRIBUTIONS BY THIRD PARTIES Revenues Income generated by the action Amount Description of the income (type of generated income and (EUR) number of users, etc) ALL WORK PACKAGES Estimated income generated by the action 0,00 Total income generated by the action 0,00 Revenues 0,00 In-kind contributions by third parties In-kind contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose etc) ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00 Total in-kind contributions 0,00 In-kind contributions 0,00 Financial contributions by third parties Financial contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose, etc) ALL WORK PACKAGES Estimated financial contributions by third parties 0,00 Total financial contributions 0,00 Financial contributions 0,00 TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00 OWN RESOURCES Amount (EUR) Own resources 5.840,50 OWN RESOURCES 5.840,50 TOTAL INCOME PARTICIPANT 29.202,44 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 Project acronym: EU-WISH Participant short name: AEMPS Participant PIC: 999563952 CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT) COSTS PER WORK PACKAGE A.1 Employees C. Purchase costs D. Other cost categories A.2 + A.3 Natural persons B. Subcontracting E. Indirect costs under direct contract and A.4 SME owners costs Total seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to C.1 Travel C.1 Accommodation C.1 Subsistence C.2 Equipment subsistence work and services third parties e = flat-rate * (a1 + a2 + a3 + a5 + b [+ a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1 + d2 + d3 + d4 + d5 + d6) WP1 WP1 4.800,00 0,00 0,00 6.042,00 2.214,00 1.992,00 1.836,00 0,00 5.000,00 0,00 15.842,00 WP2 WP2 2.050,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 2.050,00 WP3 WP3 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 WP4 WP4 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 WP5 WP5 9.400,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 9.400,00 WP6 WP6 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 WP7 WP7 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 TOTAL COSTS PARTICIPANT 16.250,00 0,00 0,00 6.042,00 2.214,00 1.992,00 1.836,00 0,00 5.000,00 0,00 1.910,44 29.202,44 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 START (DETAILED BUDGET TABLE (AG) — PROPOSAL/GRANT PREPARATION) PROJECT DATA Project number: 101140460 Project acronym: EU-WISH Participant short name: AGES Participant PIC: 998254743 WORK PACKAGES & TRAVELS Index Name Description Number of travels Delete 1 WP1 Description 1 3 2 WP2 Description 2 3 WP3 Description 3 4 WP4 Description 4 5 WP5 Description 5 6 WP6 Description 6 7 WP7 Description 7 a Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 08-12-2023 11:08 Project acronym: EU-WISH Participant short name: AGES Participant PIC: 998254743 ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity) ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR. ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP. ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically. ACTION GRANT BUDGET TABLE (PER PARTICIPANT) PROJECT COSTS A. Personnel costs Costs (actual or unit costs) Time Rate Total Also working for other work ! monthly rates allowed for budgeting because simpler to establish the approximate costs; cost reporting will have (months/other of work on Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities to be done according to MGA (usually daily rates) the action) (monthly/other) WP a b c=a*b WORK PACKAGE 1 WP1 A.1 Employees (or equivalent) Project management of the personnel involved in the EU- WISH JA across the different WPs. Organising meetings Project managers monthly 7.500,00 1,00 7.500,00 Yes, 2,3,4,6,7 and contributing to the horizontal WP1 activities. Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 7.500,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 7.500,00 WORK PACKAGE 2 WP2 A.1 Employees (or equivalent) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Leading WP2 activities for AGES by contributing to communication and dissemination activities of the project consortium; support mapping of relevant steakholders; Project managers monthly 37.500,00 Yes, 1,3,4,6,7 communication with local steakholders; dissemination to the general public; promoting the project and help increasing its broad visibility 7500 5 Advising on WP2 tasks by providing additional contacts from extended network to support mapping of relevant Senior experts/advisors/researchers monthly 8.500,00 Yes, 3,4,5,6,7 steakholders; support communication with local 8500 1 steakholders Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 46.000,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 46.000,00 WORK PACKAGE 3 WP3 A.1 Employees (or equivalent) Project manager contributing to survey on self assessment of success of the project (MS8); support Project managers monthly 7.500,00 1,00 7.500,00 Yes, 1,2,4,6,7 evaluation of implementation and impact of the project (T3.1), as well as cross WP coordination for AGES. Supprorting PM on WP3 tasks and activities: additional Senior experts/advisors/researchers monthly 8.500,00 1,00 8.500,00 Yes, 2,4,5,6,7 support for the establishment of the evaluation on impact og the project T3.1 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 16.000,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 16.000,00 WORK PACKAGE 4 WP4 A.1 Employees (or equivalent) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Leading WP4 activities for AGES supporting the integration of wastewater surveillance into national and regional policies; coordination with national ministries and Project managers monthly 7.500,00 1,00 7.500,00 Yes, 1,2,3,6,7 regional authorities; development of a long-term sustainability plan and roadmap for the integration of wastewater surveillance in national policies and improve cooperation mechanisms between EU MS Supprorting PM on WP4 tasks and advising for the establishment of an online training module T4.2 and Senior experts/advisors/researchers monthly 8.500,00 1,00 8.500,00 Yes, 2,3,5,6,7 assessment of future scenarios for regulatory purposes. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 16.000,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 16.000,00 WORK PACKAGE 5 WP5 A.1 Employees (or equivalent) Senior expert to review collection of national wastewater surveillance activities T5.1; identification and analysis of Senior experts/advisors/researchers monthly 8.300,00 2,00 16.600,00 Yes, 2,3,4,6,7 relevant actors, authorities and stakeholders Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 16.600,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 16.600,00 WORK PACKAGE 6 WP6 A.1 Employees (or equivalent) Managing WP6 activities for AGES and organising the Project managers monthly 7.500,00 3,00 22.500,00 Yes, 1,2,3,4,7 work internalle and Associated across with WPs.Ref. document Arranging meetings and Ares(2023)8598037 - 14/12/2023 supporting the WP lead. Senior expert in WP6 T6.1 activities to explore and develop wastewater surveillance sampling strategies in Senior experts/advisors/researchers monthly 8.500,00 12,00 102.000,00 Yes, 2,3,4,5,7 cities/metropolitan areas, as well as in specific settings of special interest. Contributing as part of the T6.2 lead. Junior expert for WP6 T6.2 leadership team on the statistical analysis of data collected in the project. And Junior experts/advisors/researchers monthly 7.500,00 24,00 180.000,00 no contributing to T6.3 and practical use of wastewater surveillance data for public health purposes Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 304.500,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 304.500,00 WORK PACKAGE 7 WP7 A.1 Employees (or equivalent) Senior expert for WP7 task participation providing expertise to support the development of harmonized sampling in T7.1, transportation and biobanking protocols Senior experts/advisors/researchers monthly 8.500,00 2,00 17.000,00 Yes, 2,3,4,5,6 for pathogens and AMR, T7.2 supporting advise rgd. harmonization of laboratory procedures, and T7.3 evaluate the use of sequencing approaches in wastewater surveillance. Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 17.000,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 17.000,00 Total personnel (all WPs) 423.600,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 B. Subcontracting costs Also used for other work Costs packages? Description of subcontracted project tasks/activities (actual costs) YES/NO and which WP WORK PACKAGE 1 WP1 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 2 WP2 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 3 WP3 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 4 WP4 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 5 WP5 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 6 WP6 no Sub-contracting for setting up IT systemms and IT-COMPANY 40.000,00 infrastructure 2 [Subcontract short name] 0,00 Total subcontracting for this WP 40.000,00 WORK PACKAGE 7 WP7 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 Total subcontracting (all WPs) 40.000,00 C. Purchase costs C.1 Travel and subsistence Costs Description (e.g. international/not international; place of Costs (unit cost) Also part of other work activity/destination; number of days; number of persons (actual costs) packages? (speakers, personnel and participants whose costs are Amount per Total YES/NO and which WP covered); transport means; average price per person; Number of units unit ( EUR) subsistence costs/daily allowances) WORK PACKAGE 1 WP1 1 Kick-off meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 2 persons, travel to Brussels Travel costs 0,00 369,00 2,00 738,00 no 2 persons, 2 hotel nights each, Brussels Accommodation costs 0,00 166,00 4,00 664,00 no 2 persons, 3 days each, Brussels Subsistence costs 0,00 102,00 6,00 612,00 no Total travel costs for this travel 738,00 Total accommodation costs for this travel 664,00 Total subsistence costs for this travel 612,00 Total travel 2.014,00 2 Project meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 3 persons, travel in Europe Travel costs 0,00 369,00 3,00 1.107,00 no 3 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 6,00 996,00 no 3 persons, 3 days each, Europe Subsistence costs 0,00 102,00 9,00 918,00 no Total travel costs for this travel 1.107,00 Total accommodation costs for this travel 996,00 Total subsistence costs for this travel 918,00 Total travel 3.021,00 3 Final meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 3 persons, travel in Europe Travel costs 0,00 369,00 3,00 1.107,00 no 3 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 6,00 996,00 no Associated with document Ref. Ares(2023)8598037 - 14/12/2023 3 persons, 3 days each, Europe Subsistence costs 0,00 102,00 9,00 918,00 no Total travel costs for this travel 1.107,00 Total accommodation costs for this travel 996,00 Total subsistence costs for this travel 918,00 Total travel 3.021,00 Total travel costs for this WP 2.952,00 Total accommodation costs for this WP 2.656,00 Total subsistence costs for this WP 2.448,00 Total travel for this WP 8.056,00 0,00 WORK PACKAGE 2 WP2 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 3 WP3 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 4 WP4 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 5 WP5 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 6 WP6 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 7 WP7 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 Total travel costs (all WPs) 2.952,00 Total accommodation (all WPs) 2.656,00 Total subsistence (all WPs) 2.448,00 Total travel and subsistence (all WPs) 8.056,00 C.2 Equipment Associated with document Ref. Ares(2023)8598037 - 14/12/2023 WORK PACKAGE 1 WP1 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 2 WP2 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 3 WP3 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 4 WP4 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 5 WP5 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Also part of other work Description of tasks/activities for which the equipment is packages? YES/NO and which needed WP Rate of use for the Also part of other work Associated with documentfor Ref.which Ares(2023)8598037 - 14/12/2023 action (100% or Total Description of tasks/activities the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 6 WP6 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 7 WP7 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total equipment (all WPs) 0,00 C.3 Other goods, works and services WORK PACKAGE 1 WP1 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 no Final audit certificate for grants >430.000 Euro (the value 3 Audit fees (CFS) 4.000,00 in the working template was not updated). 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 4.000,00 WORK PACKAGE 2 WP2 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 no Conference for dissemination activities Conferences, seminars, workshops, trainings & events 15.000,00 no Dissemination Costs, Open Access publications Information & publications 2.000,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 17.000,00 WORK PACKAGE 3 WP3 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total goods, works and services for this WP 0,00 WORK PACKAGE 4 WP4 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 5 WP5 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 6 WP6 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 7 WP7 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 Total goods, works and services (all WPs) 21.000,00 Total purchase costs (all WPs) 29.056,00 D. Other cost categories D.1. Financial support to third parties WORK PACKAGE 1 WP1 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 2 WP2 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 3 WP3 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 WORK PACKAGE 4 WP4 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 5 WP5 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 6 WP6 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 7 WP7 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 Total D.1 (all WPs) 0,00 Total other cost categories (all WPs) 0,00 E. Indirect costs Costs (flat-rate) Total estimated direct costs (on which indirect cost flat-rate is based, 492.656,00 see GA eligibility article) ALL WORK PACKAGES Flat-rate (%) 7% ATTENTION! Check that the rate is in line with the call conditions. Put 0% if you receive an EU Operating Grant and are not eligible to charge indirect costs” ALL WORK PACKAGES Total indirect costs 34.485,92 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total indirect costs 34.485,92 TOTAL COSTS PARTICIPANT 527.141,92 PROJECT INCOME EU CONTRIBUTION (GRANT) Amount (EUR) Total costs 527.141,92 Single Funding rate (%) 80% ATTENTION! Enter funding rate from the call conditions. Maximum EU contribution 421.713,54 Requested EU contribution 421.713,53 ATTENTION❗ In order to avoid rounding issues, please request 1 cent less than the maximum EU contribution. EU CONTRIBUTION 421.713,53 REVENUES AND CONTRIBUTIONS BY THIRD PARTIES Revenues Income generated by the action Amount Description of the income (type of generated income and (EUR) number of users, etc) ALL WORK PACKAGES Estimated income generated by the action 0,00 Total income generated by the action 0,00 Revenues 0,00 In-kind contributions by third parties In-kind contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose etc) ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00 Total in-kind contributions 0,00 In-kind contributions 0,00 Financial contributions by third parties Financial contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose, etc) ALL WORK PACKAGES Estimated financial contributions by third parties 0,00 Total financial contributions 0,00 Financial contributions 0,00 TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 OWN RESOURCES Amount (EUR) Own resources 105.428,39 OWN RESOURCES 105.428,39 TOTAL INCOME PARTICIPANT 527.141,92 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 Project acronym: EU-WISH Participant short name: AGES Participant PIC: 998254743 CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT) COSTS PER WORK PACKAGE A.1 Employees C. Purchase costs D. Other cost categories A.2 + A.3 Natural persons B. Subcontracting E. Indirect costs under direct contract and A.4 SME owners costs Total seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to C.1 Travel C.1 Accommodation C.1 Subsistence C.2 Equipment subsistence work and services third parties e = flat-rate * (a1 + a2 + a3 + a5 + b [+ a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1 + d2 + d3 + d4 + d5 + d6) WP1 WP1 7.500,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 4.000,00 0,00 19.556,00 WP2 WP2 46.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 17.000,00 0,00 63.000,00 WP3 WP3 16.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 16.000,00 WP4 WP4 16.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 16.000,00 WP5 WP5 16.600,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 16.600,00 WP6 WP6 304.500,00 0,00 40.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 344.500,00 WP7 WP7 17.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 17.000,00 TOTAL COSTS PARTICIPANT 423.600,00 0,00 40.000,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 21.000,00 0,00 34.485,92 527.141,92 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 START (DETAILED BUDGET TABLE (AG) — PROPOSAL/GRANT PREPARATION) PROJECT DATA Project number: 101140460 Project acronym: EU-WISH Participant short name: ANSES Participant PIC: 983552356 WORK PACKAGES & TRAVELS Index Name Description Number of travels Delete 1 WP1 3 2 WP2 3 WP3 4 WP4 5 WP5 6 WP6 7 WP7 a Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 08-12-2023 11:42 Project acronym: EU-WISH Participant short name: ANSES Participant PIC: 983552356 ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity) ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR. ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP. ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically. ACTION GRANT BUDGET TABLE (PER PARTICIPANT) PROJECT COSTS A. Personnel costs Costs (actual or unit costs) Time Rate Total Also working for other work ! monthly rates allowed for budgeting because simpler to establish the approximate costs; cost reporting will have (months/other of work on Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities to be done according to MGA (usually daily rates) the action) (monthly/other) WP a b c=a*b WORK PACKAGE 1 WP1 A.1 Employees (or equivalent) Project management activities across WPs will participate in the management and coordination of the project, Project managers monthly 5.750,00 0,50 2.875,00 yes, all except WP2 organising meeting and supporting WP1 horizontal activities. Senior expert and advisor for WP1 acticities supporting Senior experts/advisors/researchers monthly 7.166,00 0,50 3.583,00 yes, all except wp2 the cross WP coordination. administrative support on matters related to the grant Administrative personnel monthly 7.166,00 0,15 1.074,90 yes, WP7 and ANSES internal procedures. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 7.532,90 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 7.532,90 WORK PACKAGE 2 WP2 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 A.1 Employees (or equivalent) Collection of relevant natonal data, learning activities, dissemination of information among EU-WISH parties, Project managers monthly 7.166,00 0,50 3.583,00 no implementation of WP2 T2.3, participation in the meetings. Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 3.583,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 3.583,00 WORK PACKAGE 3 WP3 A.1 Employees (or equivalent) Project management activities across WPs , organising Project managers monthly 5.750,00 0,50 2.875,00 yes, all except WP2 meetings, contributing to reporting etc. Senior expert participation in the T3.1 work and preparation of documents about evaluation and inclusion Senior experts/advisors/researchers monthly 7.166,00 0,50 3.583,00 yes, all except wp2 of wastewater surveillance in public health preparedness plans. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 6.458,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 6.458,00 WORK PACKAGE 4 WP4 A.1 Employees (or equivalent) Project management activities across WPs organising meetings, as well as Associated withliaising with document EUAres(2023)8598037 Ref. project partners, - 14/12/2023 Project managers monthly 5.750,00 0,50 2.875,00 yes, all except WP2 managing the sustainability activities relating to EU- WISH. Senior advisor for across WPs and supporting T4.2 activities developing a long-term sustainability plan and Senior experts/advisors/researchers monthly 7.166,00 0,50 3.583,00 yes, all except wp2 roadmap for the integration of wastewater surveillance. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 6.458,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 6.458,00 WORK PACKAGE 5 WP5 A.1 Employees (or equivalent) Project management activities across WPs , organising Project managers monthly 5.750,00 1,00 5.750,00 yes, all except WP2 meetings, contributing to reporting etc. Senior expert participating in T5.1 preparation of documents about mapping the activity in each EU MS, T5.2 define the targets of wastewater surveillance, incl., Senior experts/advisors/researchers monthly 5.584,00 5,00 27.920,00 Yes, WP6 and 7 in connection with T5.3 and T5.4 respiratory viruses, polio virus and new pathogens, AMR, chemical (non- infectious) substances and illicit drugs. Participation in the meetings. Senior expert for T5.5 Wastewater surveillance for poliovirus and non-polio enterovirus and T5.6 to draft a Senior experts/advisors/researchers monthly 8.834,00 0,60 5.300,40 Yes, WP6 and 7 consensus definition for ‘emerging pathogens’ that can be applied within the framework of the revised Urban Wastewater Treatment Directive Senior expert supporting the above activities and tasks. Senior experts/advisors/researchers monthly 7.166,00 0,30 2.149,80 yes, all except wp2 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 41.120,20 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total personnel for this WP 41.120,20 WORK PACKAGE 6 WP6 A.1 Employees (or equivalent) Project management activities across WPs , organising Project managers monthly 5.750,00 1,00 5.750,00 yes, all except WP2 meetings, contributing to reporting etc. Senior expert for T6.1 to explore and develop wastewater surveillance sampling strategies in cities/metropolitan Senior experts/advisors/researchers monthly 5.584,00 5,00 27.920,00 Yes, WP5 and 7 areas, as well as in specific settings of special interest. Senior expert participating in work and preparation of documents on epidemiological data analysis tools, analysis and integration of implementation plans in Senior experts/advisors/researchers monthly 8.834,00 0,60 5.300,40 Yes, WP5 and 7 existing public health surveillance systems, advanced statistical methods and also improved data interpretation/ visualization, also participation in the meetings. Senior expert Contributing to T6.1 activities and produce guidelines for designing sampling schemes aiming to Senior experts/advisors/researchers monthly 8.083,00 0,90 7.274,70 Yes, WP7 support risk-based decision making that can be used in routine or in an ad hoc basis considering the epidemiological situation. Senior expert supporting the above mentioned tasks and Senior experts/advisors/researchers monthly 7.166,00 0,20 1.433,20 yes, all except wp2 for liaison activities and meetings. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 47.678,30 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 47.678,30 WORK PACKAGE 7 WP7 A.1 Employees (or equivalent) Project management activities across WPs , organising Project managers monthly 5.750,00 6,00 34.500,00 yes, all except WP2 meetings, contributing to reporting etc. Senior expert leading T7.2 on evaluation and harmonization of laboratory procedures identifying the Senior experts/advisors/researchers monthly 5.584,00 24,00 134.016,00 Yes, WP5 and 6 laboratory procedures used for the specific targets. Will also support activities an T7.1 and T7.3. Senior expert supporting actions dealing with data interpretation with regard to epidemiology and statistics. Developing methodological tools to identify the laboratory Senior experts/advisors/researchers monthly 8.834,00 0,60 5.300,40 Yes, WP5 and 6 procedures used for the specific targets and surveying the used wastewater surveillance methodologies, protocols and technical approaches in the MS Senior expert supporting actions dealing with data interpretation with regard to epidemiology and statistics. Developing methodological tools to identify the laboratory Senior experts/advisors/researchers monthly 8.083,00 0,90 7.274,70 Yes, WP7 procedures used for the specific targets and surveying the used wastewater surveillance methodologies, protocols and technical approaches in the MS Senior expert supporting actions dealing with data interpretation withwith Associated regard to epidemiology document and statistics. Ref. Ares(2023)8598037 - 14/12/2023 Developing methodological tools to identify the laboratory Senior experts/advisors/researchers monthly 7.625,00 0,40 3.050,00 no procedures used for the specific targets and surveying the used wastewater surveillance methodologies, protocols and technical approaches in the MS Senior expert supporting actions dealing with data interpretation with regard to epidemiology and statistics. Developing methodological tools to identify the laboratory Senior experts/advisors/researchers monthly 7.166,00 0,20 1.433,20 yes, all except wp2 procedures used for the specific targets and surveying the used wastewater surveillance methodologies, protocols and technical approaches in the MS Junior expert supporting actions dealing with data Junior experts/advisors/researchers monthly 4.583,00 3,00 13.749,00 no interpretation with regard to epidemiology and statistics. Technical personnel supporting for WP7 T7.2 activities on Technical personnel monthly 3.666,00 3,00 10.998,00 no developping and using survay tools. Technical personnel supporting for WP7 T7.2 activities on Technical personnel monthly 3.500,00 3,00 10.500,00 no developping and using survay tools. Technical personnel supporting for WP7 T7.2 activities on Technical personnel monthly 5.583,00 0,70 3.908,10 no developping and using survay tools. Senior advisor soppurtion T7.2 activities on developing Senior experts/advisors/researchers monthly 8.833,00 0,30 2.649,90 no survay tools. Administrative personnel supporting the above mentiond Administrative personnel monthly 4.333,00 0,30 1.299,90 no tasks and internal oprocedures and systems. Administrative personnel supporting the above mentiond Administrative personnel monthly 7.166,00 0,15 1.074,90 yes, WP1 tasks and internal oprocedures and systems. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 229.754,10 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 229.754,10 Total personnel (all WPs) 342.584,50 B. Subcontracting costs Also used for other work Costs packages? Description of subcontracted project tasks/activities (actual costs) YES/NO and which WP WORK PACKAGE 1 WP1 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 2 WP2 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 3 WP3 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 4 WP4 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 5 WP5 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 6 WP6 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 7 WP7 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 Total subcontracting (all WPs) 0,00 C. Purchase costs C.1 Travel and subsistence Costs Description (e.g. international/not international; place of Costs (unit cost) Also part of other work activity/destination; number of days; number of persons (actual costs) packages? (speakers, personnel and participants whose costs are Amount per Total YES/NO and which WP covered); transport means; average price per person; Number of units unit ( EUR) subsistence costs/daily allowances) WORK PACKAGE 1 WP1 1 Kick-off meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 2 persons, travel to Brussels Travel costs 0,00 369,00 2,00 738,00 no 2 persons, 2 hotel nights each, Brussels Accommodation costs 0,00 166,00 4,00 664,00 no 2 persons, 3 days each, Brussels Subsistence costs 0,00 102,00 6,00 612,00 no Total travel costs for this travel 738,00 Total accommodation costs for this travel 664,00 Total subsistence costs for this travel 612,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total travel 2.014,00 2 Project meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 3 persons, travel in Europe Travel costs 0,00 369,00 3,00 1.107,00 no 3 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 6,00 996,00 no 3 persons, 3 days each, Europe Subsistence costs 0,00 102,00 9,00 918,00 no Total travel costs for this travel 1.107,00 Total accommodation costs for this travel 996,00 Total subsistence costs for this travel 918,00 Total travel 3.021,00 3 Final meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 3 persons, travel in Europe Travel costs 0,00 369,00 3,00 1.107,00 no 3 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 6,00 996,00 no 3 persons, 3 days each, Europe Subsistence costs 0,00 102,00 9,00 918,00 no Total travel costs for this travel 1.107,00 Total accommodation costs for this travel 996,00 Total subsistence costs for this travel 918,00 Total travel 3.021,00 Total travel costs for this WP 2.952,00 Total accommodation costs for this WP 2.656,00 Total subsistence costs for this WP 2.448,00 Total travel for this WP 8.056,00 0,00 WORK PACKAGE 2 WP2 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 WORK PACKAGE 3 WP3 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 4 WP4 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 5 WP5 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 6 WP6 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 7 WP7 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 Total travel costs (all WPs) 2.952,00 Total accommodation (all WPs) 2.656,00 Total subsistence (all WPs) 2.448,00 Total travel and subsistence (all WPs) 8.056,00 C.2 Equipment WORK PACKAGE 1 WP1 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Also part of other work Description of tasks/activities for which the equipment is packages? YES/NO and which needed WP Rate of use for the Also part of other work Associated with documentfor Ref.which Ares(2023)8598037 - 14/12/2023 action (100% or Total Description of tasks/activities the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 2 WP2 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 3 WP3 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 WORK PACKAGE 4 WP4 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 5 WP5 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 6 WP6 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 7 WP7 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a no Equipment for carrying out WP7 activities Microbiological safety cabinet 12.000,00 36 3,00 100% 1.000,00 no Equipment for carrying out WP7 activities Bench-top centrifuge 5.000,00 36 12,00 100% 1.666,67 no Equipment for carrying out WP7 activities Deep freezer 13.000,00 36 18,00 100% 6.500,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 9.166,67 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 9.166,67 Total equipment (all WPs) 9.166,67 C.3 Other goods, works and services WORK PACKAGE 1 WP1 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 no audit fee 3 Audit fees (CFS) 4.000,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 4.000,00 WORK PACKAGE 2 WP2 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 no Dissemination Costs, Open Access publications Information & publications 7.500,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 7.500,00 WORK PACKAGE 3 WP3 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 4 WP4 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 5 WP5 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 6 WP6 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 7 WP7 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much no The expenses needed for each PT trials include tests that should be performed prior to PT trial and comprises cost Consumables 85.000,00 of sampling from wastewater treatment plant, preparation cost, homogeneity tests, reproducibility, stability tests. no for the organisation of onsite workshop related to SARS- Conferences, seminars, workshops, trainings & events 16.000,00 CoV-2 and also congress attendances Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 no Expenses related to cold storage sample transportation Cold storage 37.500,00 for the participants across EU which participate in the each PT trial. [6 short name other] 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total goods, works and services for this WP 138.500,00 Total goods, works and services (all WPs) 150.000,00 Total purchase costs (all WPs) 167.222,67 D. Other cost categories D.1. Financial support to third parties WORK PACKAGE 1 WP1 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 2 WP2 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 3 WP3 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 4 WP4 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 5 WP5 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP Also used for other work Description of support scheme (estimated number of packages? recipients; maximum amount per recipient) YES/NO and which WP Associated with document Ref. Ares(2023)8598037 - 14/12/2023 [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 6 WP6 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 7 WP7 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 Total D.1 (all WPs) 0,00 Total other cost categories (all WPs) 0,00 E. Indirect costs Costs (flat-rate) Total estimated direct costs (on which indirect cost flat-rate is based, 509.807,17 see GA eligibility article) ALL WORK PACKAGES Flat-rate (%) 7% ATTENTION! Check that the rate is in line with the call conditions. Put 0% if you receive an EU Operating Grant and are not eligible to charge indirect costs” Total indirect costs 35.686,50 Total indirect costs 35.686,50 TOTAL COSTS PARTICIPANT 545.493,67 PROJECT INCOME EU CONTRIBUTION (GRANT) Amount (EUR) Total costs 545.493,67 Single Funding rate (%) 80% ATTENTION! Enter funding rate from the call conditions. Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Maximum EU contribution 436.394,93 Requested EU contribution 436.394,92 ATTENTION❗ In order to avoid rounding issues, please request 1 cent less than the maximum EU contribution. EU CONTRIBUTION 436.394,92 REVENUES AND CONTRIBUTIONS BY THIRD PARTIES Revenues Income generated by the action Amount Description of the income (type of generated income and (EUR) number of users, etc) ALL WORK PACKAGES Estimated income generated by the action 0,00 Total income generated by the action 0,00 Revenues 0,00 In-kind contributions by third parties In-kind contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose etc) ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00 Total in-kind contributions 0,00 In-kind contributions 0,00 Financial contributions by third parties Financial contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose, etc) ALL WORK PACKAGES Estimated financial contributions by third parties 0,00 Total financial contributions 0,00 Financial contributions 0,00 TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00 OWN RESOURCES Amount (EUR) Own resources 109.098,75 OWN RESOURCES 109.098,75 TOTAL INCOME PARTICIPANT 545.493,67 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 Project acronym: EU-WISH Participant short name: ANSES Participant PIC: 983552356 CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT) COSTS PER WORK PACKAGE A.1 Employees C. Purchase costs D. Other cost categories A.2 + A.3 Natural persons B. Subcontracting E. Indirect costs under direct contract and A.4 SME owners costs Total seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to C.1 Travel C.1 Accommodation C.1 Subsistence C.2 Equipment subsistence work and services third parties e = flat-rate * (a1 + a2 + a3 + a5 + b [+ a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1 + d2 + d3 + d4 + d5 + d6) WP1 WP1 7.532,90 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 4.000,00 0,00 19.588,90 WP2 WP2 3.583,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 7.500,00 0,00 11.083,00 WP3 WP3 6.458,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 6.458,00 WP4 WP4 6.458,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 6.458,00 WP5 WP5 41.120,20 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 41.120,20 WP6 WP6 47.678,30 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 47.678,30 WP7 WP7 229.754,10 0,00 0,00 0,00 0,00 0,00 0,00 9.166,67 138.500,00 0,00 377.420,77 TOTAL COSTS PARTICIPANT 342.584,50 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 9.166,67 150.000,00 0,00 35.686,50 545.493,67 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 START (DETAILED BUDGET TABLE (AG) — PROPOSAL/GRANT PREPARATION) PROJECT DATA Project number: 101140460 Project acronym: EU-WISH Participant short name: AUTH Participant PIC: 999895692 WORK PACKAGES & TRAVELS Index Name Description Number of travels Delete 1 WP1 Description 1 3 2 WP2 Description 2 3 WP3 Description 3 4 WP4 Description 4 5 WP5 Description 5 6 WP6 Description 6 7 WP7 Description 7 a Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 08-12-2023 12:36 Project acronym: EU-WISH Participant short name: AUTH Participant PIC: 999895692 ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity) ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR. ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP. ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically. ACTION GRANT BUDGET TABLE (PER PARTICIPANT) PROJECT COSTS A. Personnel costs Costs (actual or unit costs) Time Rate Total Also working for other work ! monthly rates allowed for budgeting because simpler to establish the approximate costs; cost reporting will have (months/other of work on Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities to be done according to MGA (usually daily rates) the action) (monthly/other) WP a b c=a*b WORK PACKAGE 1 WP1 A.1 Employees (or equivalent) Project Manager for cross-WP coordination including assignment of project staff to individual project tasks, Project managers monthly 7.500,00 1,00 7.500,00 Yes, all monitor the project progress and ensure that the project delivers the expected outcomes in time. Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 7.500,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 7.500,00 WORK PACKAGE 2 WP2 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 A.1 Employees (or equivalent) Project Manager contributing to communication and dissemination activities of the project consortium; T2.2 mapping of relevant steakholders; communication with Project managers monthly 7.500,00 0,50 3.750,00 Yes, all local steakholders; dissemination to the general public; promoting the project and help increasing its broad visibility Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 3.750,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 3.750,00 WORK PACKAGE 3 WP3 A.1 Employees (or equivalent) Project Manager for T3.1 and T3.3. activities including monitoring and evaluating the timeliness, quality and effectiveness of the project’s implementation against the Project managers monthly 7.500,00 1,00 7.500,00 Yes, all timeplan,outputs, objectives and expected outputs, as well as development of recommendations for how these outputs may be incorporated in public health preparedness plans Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 7.500,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 7.500,00 WORK PACKAGE 4 WP4 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 A.1 Employees (or equivalent) Project management of WP4 T4.2 including activities supporting the integration of wastewater surveillance into Project managers monthly 7.500,00 1,00 7.500,00 Yes, all national and regional policies; coordination with national ministries and regional authorities; support the development of online training ressources Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 7.500,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 7.500,00 WORK PACKAGE 5 WP5 A.1 Employees (or equivalent) Project Manager for WP coordination including assignment of project staff to individual project tasks, monitor the Project managers monthly 7.500,00 1,00 7.500,00 Yes, all project progress and ensure that the project delivers the expected outcomes in time. Senior Scientific expert will help/advise the identification of stakeholders and their role in WBS. Scientific axpert Senior experts/advisors/researchers monthly 5.500,00 3,00 16.500,00 Yes, WP6 and 7 will help the critical assessment of WBS in EU and lead all AUTH activities related to Task 5.3. Senior Scientific expert will help the identification of stakeholders and their role in WBS. Scientific axpert will also help the critical assessment of respiratory viruses Senior experts/advisors/researchers monthly 5.500,00 6,00 33.000,00 yes, WP6 and 7 WBS actions, will lead literature review, identify the specific of surveillance targets for groups of targets for respiratory viruses and organize decision making practices. Junior Scientific expert for WP5 will help implenting WBS mapping, literature review and exisitng respiratory Junior experts/advisors/researchers monthly 3.000,00 12,00 36.000,00 Yes, WP7 viruses WBS schemes. Expert will also work towards identifying KPIs of WBS and identify integration approaches. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 93.000,00 A.2 + A.3 Natural persons under direct contract and seconded persons monthly 0,00 monthly 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 93.000,00 WORK PACKAGE 6 WP6 A.1 Employees (or equivalent) Project Manager for WP coordination including assignment of project staff to individual project tasks, monitor the Project managers monthly 7.500,00 1,00 7.500,00 Yes, all project progress and ensure that the project delivers the expected outcomes in time. Senior Scientific expert will support sampling approaches connected to specific targets, will help the assessment of Senior experts/advisors/researchers monthly 5.500,00 2,00 11.000,00 Yes, WP6 and 7 indicators to be used for decision making and help interpretate WBS schemes depending on the target and surveillance purpose. Senior Scientific expert will suport analysis of sampling schemes and their efficiency and applicability, will contribute to analysis and identification of best practices Senior experts/advisors/researchers monthly 5.500,00 6,00 33.000,00 yes, WP5 and 7 for data curation, will help to analysis of available indicators and data analysis and contribute to final technical recommendations. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 51.500,00 A.2 + A.3 Natural persons under direct contract and seconded persons monthly 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 51.500,00 WORK PACKAGE 7 WP7 A.1 Employees (or equivalent) Project Manager for WP coordination including assignment of project staff to individual project tasks, monitor the Project managers monthly 7.500,00 1,00 7.500,00 Yes, all project progress and ensure that the project delivers the expected outcomes in time. Senior Scientific expert will help with the selection of appropriate data analysis, evaluation of ring test results, Senior experts/advisors/researchers monthly 5.500,00 2,00 11.000,00 Yes, WP6 and 7 assessment and dissemination of best practices. Senior Scientific expert for WP6 will support the evaluation and critical assessment of technical protocols, will contribute to advanced sequence data analysis, will help organization of ring tests and will be responsible of Senior experts/advisors/researchers monthly 5.500,00 6,00 33.000,00 yes, WP5 and 6 quality control/ quality assurance of AUTH results and technical procedures. Senior expert will support the work about best practices regarding the technical protocols Junior Sientific expert will implement lab work during ring tests, will participate Associated withon trainingRef. document events and will help the Ares(2023)8598037 - 14/12/2023 Junior experts/advisors/researchers monthly 3.000,00 6,00 18.000,00 yes, WP5 evaluation of technical procedures. Other [category 1] monthly 0,00 [category 2] monthly 0,00 Total employees (or equivalent) 69.500,00 A.2 + A.3 Natural persons under direct contract and seconded persons monthly 0,00 monthly 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 69.500,00 Total personnel (all WPs) 240.250,00 B. Subcontracting costs Also used for other work Costs packages? Description of subcontracted project tasks/activities (actual costs) YES/NO and which WP WORK PACKAGE 1 WP1 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 2 WP2 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 3 WP3 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 4 WP4 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 5 WP5 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 6 WP6 1 [Subcontract short name] 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 7 WP7 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 Total subcontracting (all WPs) 0,00 C. Purchase costs C.1 Travel and subsistence Costs Description (e.g. international/not international; place of Costs (unit cost) Also part of other work activity/destination; number of days; number of persons (actual costs) packages? (speakers, personnel and participants whose costs are Amount per Total YES/NO and which WP covered); transport means; average price per person; Number of units unit ( EUR) subsistence costs/daily allowances) WORK PACKAGE 1 WP1 1 Kick-off meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 2 persons, travel to Brussels Travel costs 0,00 369,00 2,00 738,00 no 2 persons, 2 hotel nights each, Brussels Accommodation costs 0,00 166,00 4,00 664,00 no 2 persons, 3 days each, Brussels Subsistence costs 0,00 102,00 6,00 612,00 no Total travel costs for this travel 738,00 Total accommodation costs for this travel 664,00 Total subsistence costs for this travel 612,00 Total travel 2.014,00 2 Project meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 3 persons, travel in Europe Travel costs 0,00 369,00 3,00 1.107,00 no 3 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 6,00 996,00 no Associated with document Ref. Ares(2023)8598037 - 14/12/2023 3 persons, 3 days each, Europe Subsistence costs 0,00 102,00 9,00 918,00 no Total travel costs for this travel 1.107,00 Total accommodation costs for this travel 996,00 Total subsistence costs for this travel 918,00 Total travel 3.021,00 3 Final meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 3 persons, travel in Europe Travel costs 0,00 369,00 3,00 1.107,00 no 3 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 6,00 996,00 no 3 persons, 3 days each, Europe Subsistence costs 0,00 102,00 9,00 918,00 no Total travel costs for this travel 1.107,00 Total accommodation costs for this travel 996,00 Total subsistence costs for this travel 918,00 Total travel 3.021,00 Total travel costs for this WP 2.952,00 Total accommodation costs for this WP 2.656,00 Total subsistence costs for this WP 2.448,00 Total travel for this WP 8.056,00 0,00 WORK PACKAGE 2 WP2 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 3 WP3 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 4 WP4 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 5 WP5 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total travel for this WP 0,00 0,00 WORK PACKAGE 6 WP6 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 7 WP7 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 Total travel costs (all WPs) 2.952,00 Total accommodation (all WPs) 2.656,00 Total subsistence (all WPs) 2.448,00 Total travel and subsistence (all WPs) 8.056,00 C.2 Equipment WORK PACKAGE 1 WP1 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a YES WP2, WP5, WP6,WP7 A computer for the project to implement communication 1 Computer/ electronic equipment 2.000,00 36 36,00 10% 200,00 with partners, teleconferences, e-mails 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 200,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 200,00 WORK PACKAGE 2 WP2 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a YES WP1, WP5, WP6,WP7 A computer for the project for communication, 1 Computer/ electronic equipment 2.000,00 36 36,00 10% 200,00 presentations, papers 2 [Equipment short name] 0,00 0 0,00 0% 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 200,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 200,00 WORK PACKAGE 3 WP3 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 4 WP4 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) Description of tasks/activities for which the equipment is packages? YES/NO and which needed WP a b c d= a*b*c Associated with document Ref. Ares(2023)8598037 - 14/12/2023 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 5 WP5 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a YES WP1, WP2, WP6,WP7 A computer for the project for surveys, preparation of 1 Computer/ electronic equipment 2.000,00 36 36,00 30% 600,00 deliverables, communication via e-mails & teleconferences 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 600,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 Computer/ electronic equipment 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 600,00 WORK PACKAGE 6 WP6 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a YES WP1, WP2, WP5,WP7 A computer for the project for surveys, prpearation of deliverables, communication with partners and 1 Computer/ electronic equipment 2.000,00 36 36,00 20% 400,00 stakeholders via e-mail and/or teleconferences 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 400,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 400,00 WORK PACKAGE 7 WP7 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a YES, WP1, WP2, WP5, WP6 A computer for the project for data curation/analysis, 1 Computer/ electronic equipment 2.000,00 36 36,00 30% 600,00 prpearation of deliverables 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 600,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 600,00 Total equipment (all WPs) 2.000,00 C.3 Other goods, works and services WORK PACKAGE 1 WP1 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 no Final audit certificate for grants >430.000 Euro (the value 3 Audit fees (CFS) 4.000,00 in the working template was not updated). 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 4.000,00 WORK PACKAGE 2 WP2 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 no Dissemination Costs, One Open Access publication in peer Information & publications 2.000,00 reviewed scientific journal Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 2.000,00 WORK PACKAGE 3 WP3 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 4 WP4 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 5 WP5 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 NO Survey implementation costs, interlaboratory tests Survey tools 2.000,00 [6 short name other] 0,00 Total goods, works and services for this WP 2.000,00 WORK PACKAGE 6 WP6 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 7 WP7 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much NO Consumables for isolation and purification of genetic material, PCR consumables such as plastic tubes, wells, Consumables 5.000,00 strips etc, tips for pipetting, polymerase, standards for calibration curves and QC/QA, chemical reagents and standards for chemical analysis of samples Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 5.000,00 Total goods, works and services (all WPs) 13.000,00 Total purchase costs (all WPs) 23.056,00 D. Other cost categories D.1. Financial support to third parties WORK PACKAGE 1 WP1 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 2 WP2 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 3 WP3 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 4 WP4 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 5 WP5 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 6 WP6 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 WORK PACKAGE 7 WP7 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 Total D.1 (all WPs) 0,00 Total other cost categories (all WPs) 0,00 E. Indirect costs Costs (flat-rate) Total estimated direct costs (on which indirect cost flat-rate is based, 263.306,00 see GA eligibility article) ALL WORK PACKAGES Flat-rate (%) 7% ATTENTION! Check that the rate is in line with the call conditions. Put 0% if you receive an EU Operating Grant and are not eligible to charge indirect costs” Total indirect costs 18.431,42 Total indirect costs 18.431,42 TOTAL COSTS PARTICIPANT 281.737,42 PROJECT INCOME EU CONTRIBUTION (GRANT) Amount (EUR) Total costs 281.737,42 Single Funding rate (%) 80% ATTENTION! Enter funding rate from the call conditions. Maximum EU contribution 225.389,94 Requested EU contribution 225.389,93 ATTENTION❗ In order to avoid rounding issues, please request 1 cent less than the maximum EU contribution. EU CONTRIBUTION 225.389,93 REVENUES AND CONTRIBUTIONS BY THIRD PARTIES Revenues Income generated by the action Amount Description of the income (type of generated income and (EUR) number of users, etc) ALL WORK PACKAGES Estimated income generated by the action 0,00 Total income generated by the action 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Revenues 0,00 In-kind contributions by third parties In-kind contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose etc) ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00 Total in-kind contributions 0,00 In-kind contributions 0,00 Financial contributions by third parties Financial contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose, etc) ALL WORK PACKAGES Estimated financial contributions by third parties 0,00 Total financial contributions 0,00 Financial contributions 0,00 TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00 OWN RESOURCES Amount (EUR) Own resources 56.347,49 OWN RESOURCES 56.347,49 TOTAL INCOME PARTICIPANT 281.737,42 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 Project acronym: EU-WISH Participant short name: AUTH Participant PIC: 999895692 CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT) COSTS PER WORK PACKAGE A.1 Employees C. Purchase costs D. Other cost categories A.2 + A.3 Natural persons B. Subcontracting E. Indirect costs under direct contract and A.4 SME owners costs Total seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to C.1 Travel C.1 Accommodation C.1 Subsistence C.2 Equipment subsistence work and services third parties e = flat-rate * (a1 + a2 + a3 + a5 + b [+ a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1 + d2 + d3 + d4 + d5 + d6) WP1 WP1 7.500,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 200,00 4.000,00 0,00 19.756,00 WP2 WP2 3.750,00 0,00 0,00 0,00 0,00 0,00 0,00 200,00 2.000,00 0,00 5.950,00 WP3 WP3 7.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 7.500,00 WP4 WP4 7.500,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 7.500,00 WP5 WP5 93.000,00 0,00 0,00 0,00 0,00 0,00 0,00 600,00 2.000,00 0,00 95.600,00 WP6 WP6 51.500,00 0,00 0,00 0,00 0,00 0,00 0,00 400,00 0,00 0,00 51.900,00 WP7 WP7 69.500,00 0,00 0,00 0,00 0,00 0,00 0,00 600,00 5.000,00 0,00 75.100,00 TOTAL COSTS PARTICIPANT 240.250,00 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 2.000,00 13.000,00 0,00 18.431,42 281.737,42 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 START (DETAILED BUDGET TABLE (AG) — PROPOSAL/GRANT PREPARATION) PROJECT DATA Project number: 101140460 Project acronym: EU-WISH Participant short name: BIOR Participant PIC: 953459367 WORK PACKAGES & TRAVELS Index Name Description Number of travels Delete 1 WP1 3 2 WP2 3 WP3 4 WP4 5 WP5 6 WP6 7 WP7 a Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 15-11-2023 15:26 Project acronym: EU-WISH Participant short name: BIOR Participant PIC: 953459367 ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity) ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR. ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP. ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically. ACTION GRANT BUDGET TABLE (PER PARTICIPANT) PROJECT COSTS A. Personnel costs Costs (actual or unit costs) Time Rate Total Also working for other work ! monthly rates allowed for budgeting because simpler to establish the approximate costs; cost reporting will have to (months/other of work on Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities be done according to MGA (usually daily rates) the action) (monthly/other) WP a b c=a*b WORK PACKAGE 1 WP1 A.1 Employees (or equivalent) Responsible for the implementation of the project (incl., project personnel management), ensure communication with cooperation partners, strategic management and YES: WP2, WP3, WP4, WP5, technical supervision of the project (incl., achieving Project managers monthly 4.670,00 1,00 4.670,00 WP6 and WP7 results, obtaining funding according to conditions), accurate and complete preparation of reports, also participate in the meetings. Scientific expert, responsible for overall scientific YES: WP2, WP3, WP4, WP5, management of the project. Participation in the LBMC Senior experts/advisors/researchers monthly 5.230,00 1,00 5.230,00 WP6 and WP7 project management and implementation staff meeting. Assistant of scientific expert. Participation in the LBMC Junior experts/advisors/researchers monthly 3.830,00 1,00 3.830,00 YES: WP4, WP5, WP6 and WP7 project management and implementation staff meeting. Will assist in carrying out laboratory work (incl., necessary Technical personnel monthly 2.987,00 0,50 1.493,50 YES: WP5, WP6 and WP7 analyses, prepare related documents) Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 15.223,50 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 15.223,50 WORK PACKAGE 2 WP2 A.1 Employees (or equivalent) Liaising with EU project partners, participation in the YES: WP1, WP3, WP4, WP5, definition and implementation of distribution measures for Project managers monthly 4.670,00 0,50 2.335,00 WP6 and WP7 Latvia within the EU-WISH, also participation in the meetings. Collection of relevant natonal data, learning activities, YES: WP1, WP3, WP4, WP5, dissemination of information among project parties, Senior experts/advisors/researchers monthly 5.230,00 1,00 5.230,00 WP6 and WP7 implementation of WP2 team tasks, participation in the meetings. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 7.565,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 7.565,00 WORK PACKAGE 3 WP3 A.1 Employees (or equivalent) Liaising with EU project partners, participation in the YES: WP1, WP2, WP4, WP5, implementation of assessment measures in Latvia within Project managers monthly 4.670,00 1,00 4.670,00 WP6 and WP7 the EU-WISH, also participation in the meetings. Participation in the work and preparation of documents about evaluation and inclusion of wastewater surveillance YES: WP1, WP2, WP4, WP5, Senior experts/advisors/researchers monthly 5.230,00 1,00 5.230,00 in public health preparedness plans, also participation in WP6 and WP7 the meetings. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 9.900,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary Associated with document Ref. Ares(2023)8598037 - 14/12/2023 SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 9.900,00 WORK PACKAGE 4 WP4 A.1 Employees (or equivalent) Liaising with EU project partners, in the implementation of sustainability measures in Latvia as part of the EU-WISH YES: WP1, WP2, WP3, WP5, (incl., organizing the necessary space rental and catering Project managers monthly 4.670,00 1,00 4.670,00 WP6 and WP7 services for the capacity building seminar), also participation in the meetings. Participation in the co-leader of Task4.3: in the assessment of the sustainability of wastewater monitoring YES: WP1, WP2, WP3, WP5, in Latvia, also in the assessment of Latvian governance, Senior experts/advisors/researchers monthly 5.230,00 1,00 5.230,00 virtual meetings, document review, situational analysis, WP6 and WP7 collecting good practices and literature, in the organization a capacity building seminar in Latvia. Together with the EU project partners engaging in stakeholder mobilization and networking, reviewing the Junior experts/advisors/researchers monthly 3.830,00 1,00 3.830,00 YES: WP1, WP5, WP6 and WP7 documents. Pilot testing and evaluation of the tool. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 13.730,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 13.730,00 WORK PACKAGE 5 WP5 A.1 Employees (or equivalent) Responsible for the WP5 implementation in BIOR, incl., ensures communication with other EU-WISH partners, YES: WP1, WP2, WP3, WP4, Project managers monthly 4.670,00 1,00 4.670,00 carries out technical and financial supervision, prepares WP6 and WP7 necessary documentation, participation in the meetings. Participation in the work and preparation of documents about mapping the activity in each EU MS, define the targets of wastewater surveillance, wastewater YES: WP1, WP2, WP3, WP4, surveillance for respiratory virus, polio virus and emerging Senior experts/advisors/researchers monthly 5.230,00 3,00 15.690,00 WP6 and WP7 pathogens, wastewater analysis-based AMR surveillance, chemical (non-infectious) substances and illicit drugs. Participation in the laboratory work and preparation of the necessary documents on related to the definition of wastewater surveillance targets about respiratory viruses, Junior experts/advisors/researchers monthly 3.830,00 3,00 11.490,00 YES: WP1, WP4, WP6 and WP7 polio virus and new pathogens, AMR, chemical (non- infectious) substances and illicit drugs, also participation in the meetings. Carry out laboratory work (incl., necessary analyses, prepare related documents) in connection with wastewater surveillance Associated for respiratory with document viruses, polio virus -and Ref. Ares(2023)8598037 new 14/12/2023 Technical personnel monthly 2.987,00 1,00 2.987,00 YES: WP1, WP6 and WP7 pathogens, AMR, chemical (non-infectious) substances and illicit drugs, also participation in the meetings. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 34.837,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 34.837,00 WORK PACKAGE 6 WP6 A.1 Employees (or equivalent) Responsible for the WP6 implementation in BIOR, incl., ensures communication with other EU-WISH partners, YES: WP1, WP2, WP3, WP4, Project managers monthly 4.670,00 1,00 4.670,00 carries out technical and financial supervision, prepares WP5 and WP7 necessary documentation, participation in the meetings. Participation in work and preparation of documents on epidemiological data analysis tools, analysis and YES: WP1, WP2, WP3, WP4, integration of implementation plans in existing public Senior experts/advisors/researchers monthly 5.230,00 2,00 10.460,00 health surveillance systems, advanced statistical methods WP5 and WP7 and also improved data interpretation/ visualization, also participation in the meetings. Participation in the laboratory work and preparation of necessary information related to epidemiological data analysis tools, analysis and integration of implementation Junior experts/advisors/researchers monthly 3.830,00 1,00 3.830,00 YES: WP1, WP4, WP5 and WP7 plans into existing public health surveillance systems (incl., clinical surveillance), advanced statistical methods, also participation in the meetings. Participation in all the necessary WP6 activities related to laboratory work (incl., the necessary analyses, preparation Technical personnel monthly 2.987,00 1,00 2.987,00 YES: WP1, WP5 and WP7 of related documents), also participation in the meetings. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 21.947,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 21.947,00 WORK PACKAGE 7 WP7 A.1 Employees (or equivalent) Responsible for the WP7 implementation in BIOR, incl., ensures communication with other EU-WISH partners, YES: WP1, WP2, WP3, WP4, Project managers monthly 4.670,00 1,00 4.670,00 carries out technical and financial supervision, prepares WP5 and WP6 necessary documentation, participation in the meetings. Participation in the detection of various pathogens, AMR, chemicals, (non-infectious) agents, biomarkers and illicit YES: WP1, WP2, WP3, WP4, drugs in wastewater samples, also in evaluation and Senior experts/advisors/researchers monthly 5.230,00 2,00 10.460,00 coordination of biobank procedures, WP5 and WP6 sequencing, targeted sequencing evaluation, also participation in the meetings. Performing laboratory work (incl., necessary analyses, prepare related documents) for the detection of various pathogens, AMR, chemicals, (non-infectious) agents, Junior experts/advisors/researchers monthly 3.830,00 2,00 7.660,00 YES: WP1, WP4, WP5 and WP6 biomarkers and illicit drugs in wastewater samples, participation in evaluation and coordination of biobank procedures and in the meetings. Participation in sampling from wastewater facilities, transport and testing: for target pathogens (WP5), AMR, Technical personnel monthly 2.987,00 1,00 2.987,00 YES: WP1, WP5 and WP6 chemicals (including illicit drugs), also participation in the meetings. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 25.777,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 25.777,00 Total personnel (all WPs) 128.979,50 B. Subcontracting costs Also used for other work Costs packages? Description of subcontracted project tasks/activities (actual costs) YES/NO and which WP WORK PACKAGE 1 WP1 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 2 WP2 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total subcontracting for this WP 0,00 WORK PACKAGE 3 WP3 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 4 WP4 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 5 WP5 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 6 WP6 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 7 WP7 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 Total subcontracting (all WPs) 0,00 C. Purchase costs C.1 Travel and subsistence Costs Description (e.g. international/not international; place of Costs (unit cost) Also part of other work activity/destination; number of days; number of persons (actual costs) packages? (speakers, personnel and participants whose costs are Amount per Total YES/NO and which WP covered); transport means; average price per person; Number of units unit ( EUR) subsistence costs/daily allowances) WORK PACKAGE 1 WP1 1 Kick-off meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 1 persons, travel to Brussels Travel costs 0,00 369,00 1,00 369,00 no 1 persons, 2 hotel nights each, Brussels Accommodation costs 0,00 166,00 2,00 332,00 no 1 persons, 3 days each, Brussels Subsistence costs 0,00 102,00 3,00 306,00 no Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total travel costs for this travel 369,00 Total accommodation costs for this travel 332,00 Total subsistence costs for this travel 306,00 Total travel 1.007,00 2 Project meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 1 persons, 2 travel in Europe Travel costs 0,00 369,00 2,00 738,00 no 1 persons, 4 hotel nights each, Europe Accommodation costs 0,00 166,00 4,00 664,00 no 1 persons, 4 days each, Europe Subsistence costs 0,00 102,00 4,00 408,00 no Total travel costs for this travel 738,00 Total accommodation costs for this travel 664,00 Total subsistence costs for this travel 408,00 Total travel 1.810,00 3 Final meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 1 persons, travel in Europe Travel costs 0,00 369,00 1,00 369,00 no 1 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 2,00 332,00 no 1 persons, 3 days each, Europe Subsistence costs 0,00 102,00 3,00 306,00 no Total travel costs for this travel 369,00 Total accommodation costs for this travel 332,00 Total subsistence costs for this travel 306,00 Total travel 1.007,00 Total travel costs for this WP 1.476,00 Total accommodation costs for this WP 1.328,00 Total subsistence costs for this WP 1.020,00 Total travel for this WP 3.824,00 0,00 WORK PACKAGE 2 WP2 Total travel costs for this WP 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 3 WP3 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 4 WP4 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 5 WP5 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 6 WP6 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 7 WP7 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 Total travel costs (all WPs) 1.476,00 Total accommodation (all WPs) 1.328,00 Total subsistence (all WPs) 1.020,00 Total travel and subsistence (all WPs) 3.824,00 C.2 Equipment WORK PACKAGE 1 WP1 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or 60 allocated to the action less if used also for (EUR) needed WP month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 2 WP2 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or 60 allocated to the action less if used also for (EUR) needed WP month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 3 WP3 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or 60 allocated to the action less if used also for (EUR) needed WP month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant Associated with document Ref. Ares(2023)8598037 - 14/12/2023 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 4 WP4 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or 60 allocated to the action less if used also for (EUR) needed WP month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 5 WP5 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or 60 allocated to the action less if used also for (EUR) needed WP month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 6 WP6 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Also part of other work Description of tasks/activities for which the equipment is packages? YES/NO and which needed WP Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or 60 allocated to the action less if used also for (EUR) Associated needed with document Ref. Ares(2023)8598037 - 14/12/2023 WP month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 7 WP7 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or 60 allocated to the action less if used also for (EUR) needed WP month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 Total equipment (all WPs) 0,00 C.3 Other goods, works and services WORK PACKAGE 1 WP1 Costs Also part of other work Description of tasks/activities for which the goods/services (actual costs) packages? YES/NO and which are needed; types of goods services needed; how much WP Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses Associated with document Ref. Ares(2023)8598037 - 14/12/2023 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 2 WP2 Costs Also part of other work Description of tasks/activities for which the goods/services (actual costs) packages? YES/NO and which are needed; types of goods services needed; how much WP Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 no Dissemination Costs, Open Access publications Information & publications 2.000,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 2.000,00 WORK PACKAGE 3 WP3 Costs Also part of other work Description of tasks/activities for which the goods/services (actual costs) packages? YES/NO and which are needed; types of goods services needed; how much WP Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 4 WP4 Costs Also part of other work Description of tasks/activities for which the goods/services (actual costs) packages? YES/NO and which are needed; types of goods services needed; how much WP Consumables 0,00 no Members of the consortium and stakeholder capacity Conferences, seminars, workshops, trainings & events 7.870,00 building workshop No.2 (in the Riga, Latvia) - venue, catering (up to 50 - 100 people) Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 7.870,00 WORK PACKAGE 5 WP5 Costs Also part of other work Description of tasks/activities for which the goods/services (actual costs) packages? YES/NO and which are needed; types of goods services needed; how much WP Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 6 WP6 Costs Also part of other work Description of tasks/activities for which the goods/services (actual costs) packages? YES/NO and which are needed; types of goods services needed; how much WP Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 7 WP7 Costs Also part of other work Description of tasks/activities for which the goods/services (actual costs) packages? YES/NO and which are needed; types of goods services needed; how much WP yes, WP5 and 6 Laboratory materials for the detection of various pathogens, AMR, chemicals, (non-infectious) agents, Consumables 119.632,00 biomarkers and illicit drugs in wastewater samples, i.e., for sampling from wastewater facilities, testing Conferences, seminars, workshops, trainings & events Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 119.632,00 Total goods, works and services (all WPs) 129.502,00 Total purchase costs (all WPs) 133.326,00 D. Other cost categories D.1. Financial support to third parties WORK PACKAGE 1 WP1 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 2 WP2 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 3 WP3 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 4 WP4 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 5 WP5 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 6 WP6 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 7 WP7 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 Total D.1 (all WPs) 0,00 Total other cost categories (all WPs) 0,00 E. Indirect costs Costs (flat-rate) Total estimated direct costs (on which indirect cost flat-rate is based, 262.305,50 see GA eligibility article) ALL WORK PACKAGES Flat-rate (%) 7% ATTENTION! Check that the rate is in line with the call conditions. Put 0% if you receive an EU Operating Grant and are not eligible to charge indirect costs” Total indirect costs 18.361,39 Total indirect costs 18.361,39 TOTAL COSTS PARTICIPANT 280.666,89 PROJECT INCOME EU CONTRIBUTION (GRANT) Amount (EUR) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total costs 280.666,89 Single Funding rate (%) 80% ATTENTION! Enter funding rate from the call conditions. Maximum EU contribution 224.533,51 Requested EU contribution 224.533,50 ATTENTION❗ In order to avoid rounding issues, please request 1 cent less than the maximum EU contribution. EU CONTRIBUTION 224.533,50 REVENUES AND CONTRIBUTIONS BY THIRD PARTIES Revenues Income generated by the action Amount Description of the income (type of generated income and (EUR) number of users, etc) ALL WORK PACKAGES Estimated income generated by the action 0,00 Total income generated by the action 0,00 Revenues 0,00 In-kind contributions by third parties In-kind contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose etc) ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00 Total in-kind contributions 0,00 In-kind contributions 0,00 Financial contributions by third parties Financial contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose, etc) ALL WORK PACKAGES Estimated financial contributions by third parties 0,00 Total financial contributions 0,00 Financial contributions 0,00 TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00 OWN RESOURCES Amount (EUR) Own resources 56.133,39 OWN RESOURCES 56.133,39 TOTAL INCOME PARTICIPANT 280.666,89 DETAILED BUDGET TABLE (ACTION GRANTS) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Project number: 101140460 Project acronym: EU-WISH Participant short name: BIOR Participant PIC: 953459367 CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT) COSTS PER WORK PACKAGE A.1 Employees C. Purchase costs D. Other cost categories A.2 + A.3 Natural persons B. Subcontracting E. Indirect costs under direct contract and A.4 SME owners costs Total seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to C.1 Travel C.1 Accommodation C.1 Subsistence C.2 Equipment subsistence work and services third parties e = flat-rate * (a1 + a2 + a3 + a5 + b [+ a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1 + d2 + d3 + d4 + d5 + d6) WP1 WP1 15.223,50 0,00 0,00 3.824,00 1.476,00 1.328,00 1.020,00 0,00 0,00 0,00 19.047,50 WP2 WP2 7.565,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 2.000,00 0,00 9.565,00 WP3 WP3 9.900,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 9.900,00 WP4 WP4 13.730,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 7.870,00 0,00 21.600,00 WP5 WP5 34.837,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 34.837,00 WP6 WP6 21.947,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 21.947,00 WP7 WP7 25.777,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 119.632,00 0,00 145.409,00 TOTAL COSTS PARTICIPANT 128.979,50 0,00 0,00 3.824,00 1.476,00 1.328,00 1.020,00 0,00 129.502,00 0,00 18.361,39 280.666,89 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 START (DETAILED BUDGET TABLE (AG) — PROPOSAL/GRANT PREPARATION) PROJECT DATA Project number: 101140460 Project acronym: EU-WISH Participant short name: CDPC Participant PIC: 952714019 WORK PACKAGES & TRAVELS Index Name Description Number of travels Delete 1 WP1 Description 1 3 2 WP2 Description 2 3 WP3 Description 3 4 WP4 Description 4 5 WP5 Description 5 1 6 WP6 Description 6 1 7 WP7 Description 7 1 a Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 08-12-2023 12:47 Project acronym: EU-WISH Participant short name: CDPC Participant PIC: 952714019 ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity) ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR. ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP. ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically. ACTION GRANT BUDGET TABLE (PER PARTICIPANT) PROJECT COSTS A. Personnel costs Costs (actual or unit costs) Time Rate Total Also working for other work ! monthly rates allowed for budgeting because simpler to establish the approximate costs; cost reporting will have (months/other of work on Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities to be done according to MGA (usually daily rates) the action) (monthly/other) WP a b c=a*b WORK PACKAGE 1 WP1 A.1 Employees (or equivalent) Responsible for the project implementation, including line management of project staff. She will lead relationships with collaboration partners, provide strategic leadership and project management, and implementpartnerships . PM will provide managerial and technical oversight with overall responsibility for achieving cost-effective, timely, contractually compliant project results and impacts. PM will provide accurate and complete reporting; coordinate and participate in the project activities in which YES: WP2, WP3, WP4, WP5 and government, partners and/or stakeholders are involved, Project managers monthly 2.471,00 1,00 2.471,00 WP6 providethe detailed planningof the project objectives; monitor deviations from the projectwork plan, make adjustments to the plan and agreeon it with all project participants; supervise the preparation of the necessary documentation for the project realization; participate in the management of resources for the implementation of project objectives; control the timing of the project objectives. Scientific expert, responsible for overall scientific YES: WP2, WP3, WP4, WP5 and management of the project. Participation to General Senior experts/advisors/researchers monthly 3.210,00 1,00 3.210,00 Assembly and reporting duties. Participation in the CDPC WP6 project management and implementation staff meeting. Assistant of scientific expert. Participation in the CDPC Junior experts/advisors/researchers monthly 2.187,00 1,00 2.187,00 YES: WP4, WP5 and WP6 project management and implementation staff meeting. Chief specialist prepares and consults the project staff on cost accounting, Associatedbudgeting, development with document and submission Ref. Ares(2023)8598037 - 14/12/2023 of financial estimates; assists in conducting operational financial control over each project task; advises on the control over the monetary resources which used for the project implementation; controls the allocation of monetary resources between the project activities; ensures the target allocation of funds; analyzes the deviations of actual indicators of the use of the project funds from the planned ones; prepares and submits the Administrative personnel monthly 1.879,00 1,00 1.879,00 YES: WP5 and WP6 interim and the final financial reports in accordance with EU and Latvian legislation requirements; provides internal control over the financial resources and cash flows of the project; assists with solving different financial issues (management of financial resources of the project, development of financial policy of the project etc.); will calculate the logistics costs of events, analyze the budget of costs, specified above and ensure its implementation. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 9.747,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 9.747,00 WORK PACKAGE 2 WP2 A.1 Employees (or equivalent) Liaising with EU project partners, managing the Project managers monthly 2.471,00 0,50 1.235,50 yes all dissemination activities relating to EU-WISH in Latvia. Collection of relevant natonal data, learning activities, dissemination of information among EU-WISH parties, Senior experts/advisors/researchers monthly 3.210,00 1,00 3.210,00 yes all implementation of WP2 team tasks, participation in the meetings. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 4.445,50 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 4.445,50 WORK PACKAGE 3 WP3 A.1 Employees (or equivalent) Liaising with EU project partners, managing the Project managers monthly 2.471,00 1,00 2.471,00 yes all evaluation activities relating to EU-WISH in Latvia. Participation in the work and preparation of documents about evaluation and inclusion of wastewater surveillance Senior experts/advisors/researchers monthly 3.210,00 1,00 3.210,00 yes all in public health preparedness plans. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 5.681,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 5.681,00 WORK PACKAGE 4 WP4 A.1 Employees (or equivalent) Liaising with EU project partners, managing the sustainability activities relating to EU-WISH in Latvia Project managers monthly 2.471,00 1,00 2.471,00 yes all (incl., organizes the necessary purchases for the capacity building seminar). Provide sub-management of the Task4.3 as a co-leader, reporting practices and grey literature, participating in assessment of the wastewater surveillance sustainability in their country, also in governance assessment for their Senior experts/advisors/researchers monthly 3.210,00 1,00 3.210,00 yes all country, virtual meetings, reviewing the documents, in situation analysis and in the organization of a capacity building workshop in the Latvia (focus on the problems of creating a wastewater monitoring system and support mechanisms). Together with the EU project partners engaging in stakeholder mobilization and networking, reviewing the Junior experts/advisors/researchers monthly 2.187,00 1,00 2.187,00 yes, 1,5,6 documents. Pilot testing and evaluation of the tool. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 7.868,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 7.868,00 WORK PACKAGE 5 WP5 A.1 Employees (or equivalent) Responsible for the WP5 implementation in Latvia, incl., ensures communication with other EU-WISH partners, Project managers monthly 2.471,00 1,00 2.471,00 yes all carries out technical and financial supervision, prepares necessary documentation, participation in the meetings. Participation in the work and preparation of documents about mapping the activity in each EU MS, define the targets of wastewater surveillance, incl., in connection Senior experts/advisors/researchers monthly 3.210,00 0,50 1.605,00 yes all with respiratory viruses, polio virus and new pathogens, AMR, chemical (non-infectious) substances and illicit drugs. Participation in the meetings. Participation in the preparation of the necessary information related to the definition of wastewater Junior experts/advisors/researchers monthly 2.187,00 3,00 6.561,00 yes, 1,4,6 surveillance targets about respiratory viruses, polio virus and new pathogens, AMR, chemical (non-infectious) substances and illicit drugs, also participation in the meetings. Chief specialist will prepares and consults the project staff on cost accounting; analyzes the deviations of actual Administrative personnel monthly 1.879,00 2,00 3.758,00 yes, 1 and 6 indicators of the use of the project funds from the planned ones. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 14.395,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 14.395,00 WORK PACKAGE 6 WP6 A.1 Employees (or equivalent) Responsible for the WP6 implementation in Latvia, incl., ensures communication with other EU-WISH partners, Project managers monthly 2.471,00 1,00 2.471,00 yes all carries out technical and financial supervision, prepares necessary documentation, participation in the meetings. Participation in work and preparation of documents on epidemiological data analysis tools, analysis and integration of implementation plans in existing public Senior experts/advisors/researchers monthly 3.210,00 1,40 4.494,00 yes all health surveillance systems, advanced statistical methods and also improved data interpretation/ visualization, also participation in the meetings. Participation in the preparation of necessary information related to epidemiological Associated data analysis with document tools, analysis- 14/12/2023 Ref. Ares(2023)8598037 Junior experts/advisors/researchers monthly 2.187,00 3,00 6.561,00 yes, 1,4,5 and integration of implementation plans into existing public health surveillance systems, advanced statistical methods, also participation in the meetings. Chief specialist will prepares and consults the project staff on cost accounting; analyzes the deviations of actual Administrative personnel monthly 1.879,00 2,00 3.758,00 yes, 1 and 5 indicators of the use of the project funds from the planned ones. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 17.284,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 17.284,00 WORK PACKAGE 7 WP7 A.1 Employees (or equivalent) Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 0,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 0,00 Total personnel (all WPs) 59.420,50 B. Subcontracting costs Also used for other work Costs packages? Description of subcontracted project tasks/activities (actual costs) YES/NO and which WP Also used for other work Costs packages? Description of subcontracted project tasks/activities (actual costs) YES/NO and which WP Associated with document Ref. Ares(2023)8598037 - 14/12/2023 WORK PACKAGE 1 WP1 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 2 WP2 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 3 WP3 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 4 WP4 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 5 WP5 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 6 WP6 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 7 WP7 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 Total subcontracting (all WPs) 0,00 C. Purchase costs C.1 Travel and subsistence Costs Description (e.g. international/not international; place of Costs (unit cost) Also part of other work activity/destination; number of days; number of persons (actual costs) packages? (speakers, personnel and participants whose costs are Amount per Total YES/NO and which WP covered); transport means; average price per person; Number of units unit ( EUR) subsistence costs/daily allowances) WORK PACKAGE 1 WP1 1 Kick-off meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants YES: WP2, WP3, WP4, WP5 and 2 persons, travel from Riga, Latvia to Brussels, Belgium Travel costs 0,00 369,00 2,00 738,00 WP6 YES: WP2, WP3, WP4, WP5 and 2 persons, 2 hotel nights each, Brussels, Belgium Accommodation costs 0,00 166,00 4,00 664,00 WP6 YES: WP2, WP3, WP4, WP5 and 2 persons, 3 days each, Brussels, Belgium Subsistence costs 0,00 102,00 6,00 612,00 WP6 Total travel costs for this travel 738,00 Total accommodation costs for this travel 664,00 Total subsistence costs for this travel 612,00 Total travel 2.014,00 2 Project meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants YES: WP2, WP3, WP4, WP5 and 1 persons, travel from Riga, Latvia to Europe Travel costs 0,00 369,00 1,00 369,00 WP6 YES: WP2, WP3, WP4, WP5 and 1 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 2,00 332,00 WP6 YES: WP2, WP3, WP4, WP5 and 1 persons, 3 days each, Europe Subsistence costs 0,00 102,00 3,00 306,00 WP6 Total travel costs for this travel 369,00 Total accommodation costs for this travel 332,00 Total subsistence costs for this travel 306,00 Total travel 1.007,00 3 Final meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants YES: WP2, WP3, WP4, WP5 and 2 persons, travel from Riga, Latvia to Europe Travel costs 0,00 369,00 2,00 738,00 WP6 YES: WP2, WP3, WP4, WP5 and 2 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 4,00 664,00 WP6 YES: WP2, WP3, WP4, WP5 and 2 persons, 3 days each, Europe Subsistence costs 0,00 102,00 6,00 612,00 WP6 Total travel costs for this travel 738,00 Total accommodation costs for this travel 664,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total subsistence costs for this travel 612,00 Total travel 2.014,00 Total travel costs for this WP 1.845,00 Total accommodation costs for this WP 1.660,00 Total subsistence costs for this WP 1.530,00 Total travel for this WP 5.035,00 0,00 WORK PACKAGE 2 WP2 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 3 WP3 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 4 WP4 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 5 WP5 1 [Travel short name] Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants YES: WP1, WP2, WP3, WP4 and 1 persons, travel from Riga, Latvia to Europe Travel costs 0,00 369,00 1,00 369,00 WP6 YES: WP1, WP2, WP3, WP4 and 1 persons, 3 hotel nights each, Europe Accommodation costs 0,00 166,00 3,00 498,00 WP6 YES: WP1, WP2, WP3, WP4 and 1 persons, 3 days each, travel in Europe Subsistence costs 0,00 102,00 3,00 306,00 WP6 Total travel costs for this travel 369,00 Total accommodation costs for this travel 498,00 Total subsistence costs for this travel 306,00 Total travel 1.173,00 Total travel costs for this WP 369,00 Total accommodation costs for this WP 498,00 Total subsistence costs for this WP 306,00 Total travel for this WP 1.173,00 0,00 WORK PACKAGE 6 WP6 1 [Travel short name] Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants YES: WP1, WP2, WP3, WP4 and 3 persons, travel from Riga, Latvia to Europe Travel costs 0,00 369,00 3,00 1.107,00 WP5 YES: WP1, WP2, WP3, WP4 and 3 persons, 3 hotel nights each, Europe Accommodation costs 0,00 166,00 9,00 1.494,00 WP5 YES: WP1, WP2, WP3, WP4 and 3 persons, 3 days each, travel in Europe Subsistence costs 0,00 102,00 9,00 918,00 WP5 Total travel costs for this travel 1.107,00 Total accommodation costs for this travel 1.494,00 Total subsistence costs for this travel 918,00 Total travel 3.519,00 Total travel costs for this WP 1.107,00 Total accommodation costs for this WP 1.494,00 Total subsistence costs for this WP 918,00 Total travel for this WP 3.519,00 0,00 WORK PACKAGE 7 WP7 1 [Travel short name] Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants YES: WP1, WP2, WP3, WP4, 2 persons, travel from Riga, Latvia to Europe Travel costs 0,00 369,00 2,00 738,00 WP5 and WP6 YES: WP1, WP2, WP3, WP4, 2 persons, 3 hotel nights each, Europe Accommodation costs 0,00 166,00 6,00 996,00 WP5 and WP6 YES: WP1, WP2, WP3, WP4, 2 persons, 3 days each, travel in Europe Subsistence costs 0,00 102,00 6,00 612,00 WP5 and WP6 Total travel costs for this travel 738,00 Total accommodation costs for this travel 996,00 Total subsistence costs for this travel 612,00 Total travel 2.346,00 Total travel costs for this WP 738,00 Total accommodation costs for this WP 996,00 Total subsistence costs for this WP 612,00 Total travel for this WP 2.346,00 0,00 Total travel costs (all WPs) 4.059,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total accommodation (all WPs) 4.648,00 Total subsistence (all WPs) 3.366,00 Total travel and subsistence (all WPs) 12.073,00 C.2 Equipment WORK PACKAGE 1 WP1 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 2 WP2 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 3 WP3 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 4 WP4 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 5 WP5 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 6 WP6 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 7 WP7 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 Total equipment (all WPs) 0,00 C.3 Other goods, works and services WORK PACKAGE 1 WP1 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 2 WP2 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 no Dissemination Costs, Open Access publications Information & publications 1.925,92 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 1.925,92 WORK PACKAGE 3 WP3 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 4 WP4 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Members of the consortium and stakeholder capacity building workshop No.2 (in the Riga, Latvia) - publicity Conferences, seminars, workshops, trainings & events 2.330,00 and handout material development/ typography costs (for 50 - 100 people) Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 2.330,00 WORK PACKAGE 5 WP5 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 6 WP6 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 7 WP7 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 Total goods, works and services (all WPs) 4.255,92 Total purchase costs (all WPs) 16.328,92 D. Other cost categories D.1. Financial support to third parties WORK PACKAGE 1 WP1 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 2 WP2 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 3 WP3 Also used for other work Description of support scheme (estimated number of packages? recipients; maximum amount per recipient) YES/NO and which WP Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) - 14/12/2023 (actual costs) Associated with document Ref. Ares(2023)8598037 YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 4 WP4 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 5 WP5 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 6 WP6 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 7 WP7 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 Total D.1 (all WPs) 0,00 Total other cost categories (all WPs) 0,00 E. Indirect costs Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Costs (flat-rate) Total estimated direct costs (on which indirect cost flat-rate is based, 75.749,42 see GA eligibility article) ALL WORK PACKAGES Flat-rate (%) 7% ATTENTION! Check that the rate is in line with the call conditions. Put 0% if you receive an EU Operating Grant and are not eligible to charge indirect costs” Total indirect costs 5.302,46 Total indirect costs 5.302,46 TOTAL COSTS PARTICIPANT 81.051,88 PROJECT INCOME EU CONTRIBUTION (GRANT) Amount (EUR) Total costs 81.051,88 Single Funding rate (%) 80% ATTENTION! Enter funding rate from the call conditions. Maximum EU contribution 64.841,50 Requested EU contribution 64.841,49 ATTENTION❗ In order to avoid rounding issues, please request 1 cent less than the maximum EU contribution. EU CONTRIBUTION 64.841,49 REVENUES AND CONTRIBUTIONS BY THIRD PARTIES Revenues Income generated by the action Amount Description of the income (type of generated income and (EUR) number of users, etc) ALL WORK PACKAGES Estimated income generated by the action 0,00 Total income generated by the action 0,00 Revenues 0,00 In-kind contributions by third parties In-kind contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose etc) ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00 Total in-kind contributions 0,00 In-kind contributions 0,00 Financial contributions by third parties Financial contributions by third parties Amount Description of the contribution (type of contribution, (EUR) Associated with document donor, Ref. etc) purpose, Ares(2023)8598037 - 14/12/2023 ALL WORK PACKAGES Estimated financial contributions by third parties 0,00 Total financial contributions 0,00 Financial contributions 0,00 TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00 OWN RESOURCES Amount (EUR) Own resources 16.210,39 OWN RESOURCES 16.210,39 TOTAL INCOME PARTICIPANT 81.051,88 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 Project acronym: EU-WISH Participant short name: CDPC Participant PIC: 952714019 CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT) COSTS PER WORK PACKAGE A.1 Employees C. Purchase costs D. Other cost categories A.2 + A.3 Natural persons B. Subcontracting E. Indirect costs under direct contract and A.4 SME owners costs Total seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to C.1 Travel C.1 Accommodation C.1 Subsistence C.2 Equipment subsistence work and services third parties e = flat-rate * (a1 + a2 + a3 + a5 + b [+ a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1 + d2 + d3 + d4 + d5 + d6) WP1 WP1 9.747,00 0,00 0,00 5.035,00 1.845,00 1.660,00 1.530,00 0,00 0,00 0,00 14.782,00 WP2 WP2 4.445,50 0,00 0,00 0,00 0,00 0,00 0,00 0,00 1.925,92 0,00 6.371,42 WP3 WP3 5.681,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 5.681,00 WP4 WP4 7.868,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 2.330,00 0,00 10.198,00 WP5 WP5 14.395,00 0,00 0,00 1.173,00 369,00 498,00 306,00 0,00 0,00 0,00 15.568,00 WP6 WP6 17.284,00 0,00 0,00 3.519,00 1.107,00 1.494,00 918,00 0,00 0,00 0,00 20.803,00 WP7 WP7 0,00 0,00 0,00 2.346,00 738,00 996,00 612,00 0,00 0,00 0,00 2.346,00 TOTAL COSTS PARTICIPANT 59.420,50 0,00 0,00 12.073,00 4.059,00 4.648,00 3.366,00 0,00 4.255,92 0,00 5.302,46 81.051,88 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 START (DETAILED BUDGET TABLE (AG) — PROPOSAL/GRANT PREPARATION) PROJECT DATA Project number: 101140460 Project acronym: EU-WISH Participant short name: CING Participant PIC: 999642522 WORK PACKAGES & TRAVELS Index Name Description Number of travels Delete 1 WP1 Description 1 3 2 WP2 Description 2 3 WP3 Description 3 4 WP4 Description 4 5 WP5 Description 5 6 WP6 Description 6 7 WP7 Description 7 a Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 14-11-2023 12:54 Project acronym: EU-WISH Participant short name: CING Participant PIC: 999642522 ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity) ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR. ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP. ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically. ACTION GRANT BUDGET TABLE (PER PARTICIPANT) PROJECT COSTS A. Personnel costs Costs (actual or unit costs) Time Rate Total Also working for other work ! monthly rates allowed for budgeting because simpler to establish the approximate costs; cost reporting will have (months/other of work on Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities to be done according to MGA (usually daily rates) the action) (monthly/other) WP a b c=a*b WORK PACKAGE 1 WP1 A.1 Employees (or equivalent) Handle the overall management of the project for this affiliated entity, organise and co-ordinate mmeting with Senior experts/advisors/researchers monthly 10.106,00 0,20 2.021,20 yes, WP5 and WP7 Cy-partners and lead financial management. Assign and distribute work among CING participants and support the overall management of the project for this Senior experts/advisors/researchers monthly 8.557,00 0,30 2.567,10 yes, WP2, WP5,WP7 affiliated entity, help organise and co-ordinate mmeting with Cy-partners and handle financial management. Safeguard adherence to timeline and preparation of time Senior experts/advisors/researchers monthly 8.607,00 0,20 1.721,40 yes, WP2, WP4, WP5, WP7 sheets Contribute to the overall management of the project for this affiliated entity, organise and co-ordinate mmeting Senior experts/advisors/researchers monthly 5.000,00 0,30 1.500,00 yes, WP2, WP4, WP5, WP7 with Cy-partners and lead financial management. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 7.809,70 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary Associated with document Ref. Ares(2023)8598037 - 14/12/2023 SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 7.809,70 WORK PACKAGE 2 WP2 A.1 Employees (or equivalent) Work towards maximizing the impact of the project and contribute actively towards the preparation of Senior experts/advisors/researchers monthly 8.557,00 0,20 1.711,40 yes, WP1, WP5,WP7 publications. Responsibility to increase local visibility with stakeholders Senior experts/advisors/researchers monthly 5.000,00 0,20 1.000,00 yes, WP1, WP4, WP5, WP7 and prepare timely dissemination reports. Support in preparation of publications Senior experts/advisors/researchers monthly 8.607,00 0,10 860,70 yes, WP1, WP4, WP5, WP7 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 3.572,10 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 3.572,10 WORK PACKAGE 3 WP3 A.1 Employees (or equivalent) Support the Cyprus Ministry of Health in integration of Waste water surveillance for preparedness, define key Senior experts/advisors/researchers monthly 1,00 5.000,00 Yes, all except WP3 and 6 performance indicators and evaluate cost/ benefits of wastewater based surveillance. 5.000 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 5.000,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 5.000,00 WORK PACKAGE 4 WP4 A.1 Employees (or equivalent) Contribute to develop training resources for surveillance capacities at national and EU level, support knowledge Senior experts/advisors/researchers monthly 8.607,00 0,20 1.721,40 yes, WP1, WP2, WP5, WP7 transfer and capacity building. Contribute to develop training resources for surveillance capacities at national and EU level, support knowledge Senior experts/advisors/researchers monthly 5.000,00 0,50 2.500,00 Yes, all except WP3 and 6 transfer and capacity building. Contribute to develop training resources for surveillance capacities at national and EU level, support knowledge Junior experts/advisors/researchers monthly 6.314,00 0,20 1.262,80 Yes, WP5, WP7 transfer and capacity building. Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 5.484,20 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 5.484,20 WORK PACKAGE 5 WP5 A.1 Employees (or equivalent) Contribute to the creation of Cyprus-specific priority lists and groups of the WW surveillance targets with a focus Senior experts/advisors/researchers monthly 10.106,00 0,10 1.010,60 yes, WP1 and WP7 on poliovirus/ non-poliovirus enteroviruses as well as emerging pathogens. Contribute to the creation of Cyprus-specific priority lists and groups of the WW surveillance targets with a focus Senior experts/advisors/researchers monthly 8.557,00 0,30 2.567,10 yes, WP1, WP2,WP7 on poliovirus/ non-poliovirus enteroviruses as well as emerging pathogens and coordinate with Cy-Partners to compile results. Conduct comprehensive system mapping to identify the Senior experts/advisors/researchers monthly 8.607,00 0,30 2.582,10 yes, WP1, WP2, WP7 relevant WBS actors and stakeholders in Cyprus Contribute to the creation of Cyprus-specific priority lists and groups of the WW surveillance targets with a focus Senior experts/advisors/researchers monthly 5.000,00 4,00 20.000,00 Yes, all on poliovirus/ non-poliovirus enteroviruses as well as emerging pathogens and coordinate with Cy-Partners to compile results. Conduct comprehensive system mapping to identify the Junior experts/advisors/researchers monthly 6.314,00 0,50 3.157,00 Yes, WP4, WP7 relevant WBS actors and stakeholders in Cyprus Conduct comprehensive system mapping to identify the Technical personnel monthly 4.675,00 0,50 2.337,50 Yes, WP7 relevant WBS actors and stakeholders in Cyprus Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 31.654,30 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 31.654,30 WORK PACKAGE 6 WP6 A.1 Employees (or equivalent) Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 0,00 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 0,00 WORK PACKAGE 7 WP7 A.1 Employees (or equivalent) contribute to assess and evaluate the current technical laboratory procedures of the detection and/or typing of priority targets Senior experts/advisors/researchers monthly 10.106,00 0,10 1.010,60 yes, WP1 and WP7 assess and evaluate the current procedures regarding sequencing techniques and data analysis participate in interlaboratory ring trials as well as on-site training events Contributes to assess and evaluate the current technical laboratory procedures of the detection and/or typing of Senior experts/advisors/researchers monthly 8.557,00 2,00 17.114,00 yes, WP1, WP2,WP5 priority targets and supervise the evaluation of the current procedures regarding sequencing techniques and data analysis. Assist in assessing and evaluating the current technical laboratory procedures of the detection and/or typing of Senior experts/advisors/researchers monthly 8.607,00 0,80 6.885,60 yes, WP1, WP2, WP5 priority targets and help to assess and evaluate the current procedures regarding sequencing techniques and data analysis. Contribute to assess and evaluate the current technical laboratory procedures Associated for the detection with document and/or typing -of Ref. Ares(2023)8598037 14/12/2023 Senior experts/advisors/researchers monthly 5.000,00 4,00 20.000,00 Yes, all except WP3 and 6 priority targets and coordinate participation in interlaboratory ring trials as well as on-site training events. Provide support and participate in interlaboratory ring Junior experts/advisors/researchers monthly 6.314,00 1,00 6.314,00 Yes, WP4, WP5 trials as well as the organasition of on-site training events. Assist in evaluating the current procedures regarding sequencing techniques and data analysis and Technical personnel monthly 4.675,00 2,00 9.350,00 Yes, WP5 participate in interlaboratory ring trials as well as on-site training events. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 60.674,20 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 60.674,20 Total personnel (all WPs) 114.194,50 B. Subcontracting costs Also used for other work Costs packages? Description of subcontracted project tasks/activities (actual costs) YES/NO and which WP WORK PACKAGE 1 WP1 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 2 WP2 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 3 WP3 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 4 WP4 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 5 WP5 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 6 WP6 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 7 WP7 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 Total subcontracting (all WPs) 0,00 C. Purchase costs C.1 Travel and subsistence Costs Description (e.g. international/not international; place of Costs (unit cost) Also part of other work activity/destination; number of days; number of persons (actual costs) packages? (speakers, personnel and participants whose costs are Amount per Total YES/NO and which WP covered); transport means; average price per person; Number of units unit ( EUR) subsistence costs/daily allowances) WORK PACKAGE 1 WP1 1 Kick-off meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 2 persons, travel to Brussels Travel costs 0,00 369,00 2,00 738,00 no 2 persons, 3 hotel nights each, Brussels Accommodation costs 0,00 166,00 6,00 996,00 no 2 persons, 3 days each, Brussels Subsistence costs 0,00 102,00 6,00 612,00 no Total travel costs for this travel 738,00 Total accommodation costs for this travel 996,00 Total subsistence costs for this travel 612,00 Total travel 2.346,00 2 Project meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 2 persons, travel to Brussels Travel costs 0,00 369,00 2,00 738,00 no 2 persons, 3 hotel nights each, Brussels Accommodation costs 0,00 166,00 6,00 996,00 no 2 persons, 3 days each, Brussels Subsistence costs 0,00 102,00 6,00 612,00 no Total travel costs for this travel 738,00 Total accommodation costs for this travel 996,00 Total subsistence costs for this travel 612,00 Total travel 2.346,00 3 Final meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 2 persons, travel in Europe Travel costs 0,00 369,00 2,00 738,00 no 2 persons, 3 hotel nights each, Europe Accommodation costs 0,00 166,00 6,00 996,00 no 2 persons, 3 days each, Europe Subsistence costs 0,00 102,00 6,00 612,00 no Total travel costs for this travel 738,00 Total accommodation costs for this travel 996,00 Total subsistence costs for this travel 612,00 Total travel 2.346,00 Total travel costs for this WP 2.214,00 Total accommodation costs for this WP 2.988,00 Total subsistence costs for this WP 1.836,00 Total travel for this WP 7.038,00 0,00 WORK PACKAGE 2 WP2 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 3 WP3 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 4 WP4 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 5 WP5 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 6 WP6 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 7 WP7 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 Total travel costs (all WPs) 2.214,00 Total accommodation (all WPs) 2.988,00 Total subsistence (all WPs) 1.836,00 Total travel and subsistence (all WPs) 7.038,00 C.2 Equipment WORK PACKAGE 1 WP1 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 2 WP2 C.2.1 Purchase (depreciation/full cost) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 3 WP3 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 4 WP4 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 5 WP5 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 6 WP6 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 7 WP7 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 Total equipment (all WPs) 0,00 C.3 Other goods, works and services WORK PACKAGE 1 WP1 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 2 WP2 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 3 WP3 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 4 WP4 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 5 WP5 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 6 WP6 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 7 WP7 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much yes, WP6 Consumables for optimisation of method and protocols for Consumables 7.454,00 detection and typing of pathogens in WW samples, participation in ring trials Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 7.454,00 Total goods, works and services (all WPs) 7.454,00 Total purchase costs (all WPs) 14.492,00 D. Other cost categories D.1. Financial support to third parties WORK PACKAGE 1 WP1 Also used for other work Description of support scheme (estimated number of packages? recipients; maximum amount per recipient) YES/NO and which WP Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) - 14/12/2023 (actual costs) Associated with document Ref. Ares(2023)8598037 YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 2 WP2 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 3 WP3 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 4 WP4 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 5 WP5 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 6 WP6 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 7 WP7 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 Total D.1 (all WPs) 0,00 Total other cost categories (all WPs) 0,00 E. Indirect costs Costs (flat-rate) Total estimated direct costs (on which indirect cost flat-rate is based, 128.686,50 see GA eligibility article) ALL WORK PACKAGES Flat-rate (%) 7% ATTENTION! Check that the rate is in line with the call conditions. Put 0% if you receive an EU Operating Grant and are not eligible to charge indirect costs” Total indirect costs 9.008,06 Total indirect costs 9.008,06 TOTAL COSTS PARTICIPANT 137.694,56 PROJECT INCOME EU CONTRIBUTION (GRANT) Amount (EUR) Total costs 137.694,56 Single Funding rate (%) 80% ATTENTION! Enter funding rate from the call conditions. Maximum EU contribution 110.155,64 Requested EU contribution 110.155,63 ATTENTION❗ In order to avoid rounding issues, please request 1 cent less than the maximum EU contribution. EU CONTRIBUTION 110.155,63 REVENUES AND CONTRIBUTIONS BY THIRD PARTIES Revenues Income generated by the action Amount Description of the income (type of generated income and (EUR) number of users, etc) ALL WORK PACKAGES Estimated income generated by the action 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total income generated by the action 0,00 Revenues 0,00 In-kind contributions by third parties In-kind contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose etc) ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00 Total in-kind contributions 0,00 In-kind contributions 0,00 Financial contributions by third parties Financial contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose, etc) ALL WORK PACKAGES Estimated financial contributions by third parties 0,00 Total financial contributions 0,00 Financial contributions 0,00 TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00 OWN RESOURCES Amount (EUR) Own resources 27.538,93 OWN RESOURCES 27.538,93 TOTAL INCOME PARTICIPANT 137.694,56 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 Project acronym: EU-WISH Participant short name: CING Participant PIC: 999642522 CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT) COSTS PER WORK PACKAGE A.1 Employees C. Purchase costs D. Other cost categories A.2 + A.3 Natural persons B. Subcontracting E. Indirect costs under direct contract and A.4 SME owners costs Total seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to C.1 Travel C.1 Accommodation C.1 Subsistence C.2 Equipment subsistence work and services third parties e = flat-rate * (a1 + a2 + a3 + a5 + b [+ a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1 + d2 + d3 + d4 + d5 + d6) WP1 WP1 7.809,70 0,00 0,00 7.038,00 2.214,00 2.988,00 1.836,00 0,00 0,00 0,00 14.847,70 WP2 WP2 3.572,10 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 3.572,10 WP3 WP3 5.000,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 5.000,00 WP4 WP4 5.484,20 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 5.484,20 WP5 WP5 31.654,30 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 31.654,30 WP6 WP6 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 WP7 WP7 60.674,20 0,00 0,00 0,00 0,00 0,00 0,00 0,00 7.454,00 0,00 68.128,20 TOTAL COSTS PARTICIPANT 114.194,50 0,00 0,00 7.038,00 2.214,00 2.988,00 1.836,00 0,00 7.454,00 0,00 9.008,06 137.694,56 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 START (DETAILED BUDGET TABLE (AG) — PROPOSAL/GRANT PREPARATION) PROJECT DATA Project number: 101140460 Project acronym: EU-WISH Participant short name: CIPH Participant PIC: 998128255 WORK PACKAGES & TRAVELS Index Name Description Number of travels Delete 1 WP1 Description 1 3 2 WP2 Description 2 3 WP3 Description 3 4 WP4 Description 4 5 WP5 Description 5 6 WP6 Description 6 7 WP7 Description 7 a Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 15-11-2023 10:51 Project acronym: EU-WISH Participant short name: CIPH Participant PIC: 998128255 ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity) ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR. ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP. ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically. ACTION GRANT BUDGET TABLE (PER PARTICIPANT) PROJECT COSTS A. Personnel costs Costs (actual or unit costs) Time Rate Total Also working for other work ! monthly rates allowed for budgeting because simpler to establish the approximate costs; cost reporting will have (months/other of work on Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities to be done according to MGA (usually daily rates) the action) (monthly/other) WP a b c=a*b WORK PACKAGE 1 WP1 A.1 Employees (or equivalent) project manager - WP1 project management activities, Project managers monthly 1.938,67 0,50 969,34 no administration tasks, financial reporting, coordination, communication senior expert - WP1 project management activities, administration tasks, financial reporting, coordination, Senior experts/advisors/researchers monthly 4.006,96 0,50 2.003,48 yes, all except WP5 and WP7 communication - supporting project management team Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 2.972,82 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 2.972,82 WORK PACKAGE 2 WP2 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 A.1 Employees (or equivalent) Senior expert - Project communication and dissemination activities that will take place during the project aim at reaching multiple audiences and include gathering and consolidation of information about the project, Senior experts/advisors/researchers monthly 4.006,96 0,50 2.003,48 yes, all except WP5 and WP7 disseminating the information through the communication channels Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 2.003,48 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 2.003,48 WORK PACKAGE 3 WP3 A.1 Employees (or equivalent) Senior expert - Evaluation of implementation and impact monitoring and evaluating the timeliness, quality and Senior experts/advisors/researchers monthly 4.006,96 1,00 4.006,96 yes, all except WP5 and WP7 effectiveness of the project’s implementation against the timeplan,outputs, objectives and expected results Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 4.006,96 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 4.006,96 WORK PACKAGE 4 WP4 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 A.1 Employees (or equivalent) Senior expert - Development of a long-term sustainability plan and roadmap for the integration of wastewater Senior experts/advisors/researchers monthly 4.006,96 1,00 4.006,96 yes, all except WP5 and WP7 surveillance in national policies and improve cooperation mechanisms between EU Member states Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 4.006,96 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 4.006,96 WORK PACKAGE 5 WP5 A.1 Employees (or equivalent) Senior experts will help in mapping current actions and Senior experts/advisors/researchers monthly 3.719,57 5,00 18.597,85 no future priority targets of wastewater surveillance Junior experts will support with technical advising, pilot Junior experts/advisors/researchers monthly 2.269,38 10,00 22.693,80 yes, WP7 studies, collecting data from the different data bases Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 41.291,65 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 41.291,65 WORK PACKAGE 6 WP6 A.1 Employees (or equivalent) Senior experts will help in defning sampling scpe, as well as in implementation Associated withplan for modelling document and integration Ref. Ares(2023)8598037 - 14/12/2023 Senior experts/advisors/researchers monthly 4.006,96 2,00 8.013,92 yes, all except WP5 and WP7 into existing public health surveillance systems, including clinical surveillance. They will help with advanced statistical methods and modeling. Junior experts will help with prepering collected data for Junior experts/advisors/researchers monthly 2.081,92 9,00 18.737,28 no statistical methods and modeling and will perform data modeling. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 26.751,20 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 26.751,20 WORK PACKAGE 7 WP7 A.1 Employees (or equivalent) Senior expert will hlp with wastewater surveillance technical procedures: sampling schemes and analysis Senior experts/advisors/researchers monthly 3.877,95 19,00 73.681,05 no methods for priority targets including viruses, bacteria, AMR and chemicals. Junior experts will support with technical advising, pilot studies and implementation procedures selecting the Junior experts/advisors/researchers monthly 2.225,66 33,00 73.446,78 yes, WP7 most feasible solution for sampling and for laboratory analyses for selected priority targets. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 147.127,83 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 147.127,83 Total personnel (all WPs) 228.160,90 B. Subcontracting costs Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Also used for other work Costs packages? Description of subcontracted project tasks/activities (actual costs) YES/NO and which WP WORK PACKAGE 1 WP1 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 2 WP2 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 3 WP3 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 4 WP4 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 5 WP5 1 [Subcontract short name] 0,00 2 [Subcontract short name] 0,00 Total subcontracting for this WP 0,00 WORK PACKAGE 6 WP6 no Engaging external epert for the modeling of the 1 [modeling] 5.000,00 epidemiological, microbiological and chemical analyses collected at pilot locations. 2 [Subcontract short name] 0,00 Total subcontracting for this WP 5.000,00 WORK PACKAGE 7 WP7 no Existing data base for SASR-CoV-2 need to be upgraded to allow incorporation of other patogens and pollutants 1 [upgrading the IT base for other pathogens] 40.000,00 such as polio virus, AMR and selected chemicals. no To perform sampling at selected pilot studies in some cases it will be necessary to engage external sampling laboratories in order to cover as more as possible 2 [sampling] 6.000,00 different scenarios with the final goal to develop new surveilance methods and to ensure sustainability of the surveillance system for public health needs. Total subcontracting for this WP 46.000,00 Total subcontracting (all WPs) 51.000,00 C. Purchase costs C.1 Travel and subsistence Costs Description (e.g. international/not international; place of Costs (unit cost) Also part of other work activity/destination; number of days; number of persons (actual costs) packages? (speakers, personnel and participants whose costs are Amount per Total YES/NO and which WP covered); transport means; average price per person; Number of units unit ( EUR) subsistence costs/daily allowances) WORK PACKAGE 1 WP1 1 Kick-off meeting Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 2 persons, travel to Brussels Travel costs 0,00 369,00 2,00 738,00 no 2 persons, 2 hotel nights each, Brussels Accommodation costs 0,00 166,00 4,00 664,00 no 2 persons, 3 days each, Brussels Subsistence costs 0,00 102,00 6,00 612,00 no Total travel costs for this travel 738,00 Total accommodation costs for this travel 664,00 Total subsistence costs for this travel 612,00 Total travel 2.014,00 2 Project meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants 3 persons, travel in Europe Travel costs 0,00 369,00 3,00 1.107,00 no 3 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 6,00 996,00 no 3 persons, 3 days each, Europe Subsistence costs 0,00 102,00 9,00 918,00 no Total travel costs for this travel 1.107,00 Total accommodation costs for this travel 996,00 Total subsistence costs for this travel 918,00 Total travel 3.021,00 3 Final meeting Speakers Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Personnel Travel costs 0,00 0,00 0,00 0,00 Accommodation costs 0,00 0,00 0,00 0,00 Subsistence costs 0,00 0,00 0,00 0,00 Participants Associated with document Ref. Ares(2023)8598037 - 14/12/2023 3 persons, travel in Europe Travel costs 0,00 369,00 3,00 1.107,00 no 3 persons, 2 hotel nights each, Europe Accommodation costs 0,00 166,00 6,00 996,00 no 3 persons, 3 days each, Europe Subsistence costs 0,00 102,00 9,00 918,00 no Total travel costs for this travel 1.107,00 Total accommodation costs for this travel 996,00 Total subsistence costs for this travel 918,00 Total travel 3.021,00 Total travel costs for this WP 2.952,00 Total accommodation costs for this WP 2.656,00 Total subsistence costs for this WP 2.448,00 Total travel for this WP 8.056,00 0,00 WORK PACKAGE 2 WP2 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 3 WP3 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 4 WP4 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 5 WP5 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 6 WP6 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 WORK PACKAGE 7 WP7 Total travel costs for this WP 0,00 Total accommodation costs for this WP 0,00 Total subsistence costs for this WP 0,00 Total travel for this WP 0,00 0,00 Total travel costs (all WPs) 2.952,00 Total accommodation (all WPs) 2.656,00 Total subsistence (all WPs) 2.448,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Total travel and subsistence (all WPs) 8.056,00 C.2 Equipment WORK PACKAGE 1 WP1 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 2 WP2 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 3 WP3 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Also part of other work Description of tasks/activities for which the equipment is packages? YES/NO and which needed WP Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities with documentfor Ref.which the equipment is Price packages? YES/NO and which Associated Ares(2023)8598037 - 14/12/2023 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 4 WP4 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 5 WP5 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Associated with document Ref. Ares(2023)8598037 - 14/12/2023 Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 6 WP6 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a 1 [Equipment short name] 0,00 0 0,00 0% 0,00 2 [Equipment short name] 0,00 0 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 0,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) a b c d= a*b*c 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 0,00 WORK PACKAGE 7 WP7 C.2.1 Purchase (depreciation/full cost) Costs (actual costs) Depreciation Rate of use for the Also part of other work method (e.g. Number of months action (100% or Total Description of tasks/activities for which the equipment is Price packages? YES/NO and which 36 month or allocated to the action less if used also for (EUR) needed WP 60 month) other purposes) a b c d e =(c/b *d) * a Waste water sampling devisces will be purchased and 1 [Waste water sampling devices] 50.000,00 60 36,00 100% 30.000,00 no used for waste water sampling at the pilot locations such as nursing home PCR will be used for the method development and implementation of the new analytical methods based on 2 [PCR] 30.000,00 60 36,00 100% 18.000,00 no best international practices and recommendations. Extraction unit will be used for the analyses of the sampels from the pilot locations and from trials and is 3 [Extraction unit] 40.000,00 60 36,00 100% 24.000,00 no necessary prerecquisite for the further PCR analyses (expained above). ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total depreciation 72.000,00 C.2.2 Rental and leasing (rate of use/full cost) Costs (actual costs) Rate of use for the Also part of other work action (100% or Total Description of tasks/activities for which the equipment is Monthly rent/fee Number of months of use for the action packages? YES/NO and which less if used also for (EUR) needed WP other purposes) Description of tasks/activities for which the equipment is packages? YES/NO and which needed WP a b c d= a*b*c Associated with document Ref. Ares(2023)8598037 - 14/12/2023 1 [Equipment short name] 0,00 0,00 0% 0,00 2 [Equipment short name] 0,00 0,00 0% 0,00 ATTENTION! Can be used only if full cost option in the grant 3 [Equipment short name] 0,00 0,00 agreement Total rental and leasing 0,00 Total equipment for this WP 72.000,00 Total equipment (all WPs) 72.000,00 C.3 Other goods, works and services WORK PACKAGE 1 WP1 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 no Final audit certificate for grants >430.000 Euro (the value 3 Audit fees (CFS) 4.000,00 in the working template was not updated). 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 4.000,00 WORK PACKAGE 2 WP2 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 no Dissemination Costs, Open Access publications Information & publications 2.000,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 2.000,00 WORK PACKAGE 3 WP3 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 4 WP4 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 5 WP5 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 Conferences, seminars, workshops, trainings & events 0,00 Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 [5 short name other] 0,00 [6 short name other] 0,00 Total goods, works and services for this WP 0,00 WORK PACKAGE 6 WP6 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much Consumables 0,00 no Senior and junior experts presentation at the conferences of the project results related to the surveillance: usage Conferences, seminars, workshops, trainings & events 4.000,00 of wastewater data for public health (travel, accomodation, fees, dailys) Information & publications 0,00 Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 4 Project evaluation 0,00 no Purcahse of the software licence that will be sued for the 5 Software 5.000,00 advanced statistical modeling of viruses, bacteria, AMR markers. [6 short name other] 0,00 Total goods, works and services for this WP 9.000,00 WORK PACKAGE 7 WP7 Costs Also part of other work Description of tasks/activities for which the (actual costs) packages? YES/NO and which goods/services are needed; types of goods services WP needed; how much no Consumables for the analyses of waste water samples that will be colected at the pilot sites includes: standards, Consumables 70.000,00 kits, laboratory plastics and other laboratory consumambles such as VITEK etc no Senior and junior experts presentation at the conferences of the project results related to the wastewater Conferences, seminars, workshops, trainings & events 15.000,00 surveillance technical procedures: sampling schemes and analysis methods for priority targets health (travel, accomodation, fees, dailys) no Cost of the publication at the Open Access journals of the project results related to the wastewater surveillance Information & publications 4.000,00 technical procedures: sampling schemes and analysis methods for priority Other expenses 1 IPR costs 0,00 2 Bank fees (pre-financing guarantee) 0,00 3 Audit fees (CFS) 0,00 4 Project evaluation 0,00 no Excetrnal laboratory services will be used for DNA/RNA sequencing and similar services that will be needed for 5 Services 45.000,00 the analyses of the waste water samples collected at the pilot sites. no Purcahse of the software licence that will be sued for the 6 Software 5.000,00 advanced statistical modeling of chemicals. no Shipping cost to pilot locations and from pliot locations to 7 Other expenses 30.000,00 collect waste water samples. no Small laboratory equipment such as: pipettes, pumps that 8 Minor instruments 10.000,00 will be used for the analyeses of the wastewater sampels collected at the pilot sites. no consumables and other cost related to the ring trials that will be needed in order to assure good quality of the 9 Ring trials 5.000,00 laboratory results for priority target analytes such as viruses, bacteria, AMR markers and selected chemicals. Total goods, works and services for this WP 184.000,00 Total goods, works and services (all WPs) 199.000,00 Total purchase costs (all WPs) 279.056,00 D. Other cost categories D.1. Financial support to third parties WORK PACKAGE 1 WP1 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 WORK PACKAGE 2 WP2 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 3 WP3 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 4 WP4 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 5 WP5 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 6 WP6 Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) (actual costs) YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 WORK PACKAGE 7 WP7 Also used for other work Description of support scheme (estimated number of packages? recipients; maximum amount per recipient) YES/NO and which WP Also used for other work Costs Description of support scheme (estimated number of Financial support to third parties packages? recipients; maximum amount per recipient) - 14/12/2023 (actual costs) Associated with document Ref. Ares(2023)8598037 YES/NO and which WP [Support scheme short name] 0,00 [Support scheme short name] 0,00 0,00 Total other cost category D.1 for this WP 0,00 Total D.1 (all WPs) 0,00 Total other cost categories (all WPs) 0,00 E. Indirect costs Costs (flat-rate) Total estimated direct costs (on which indirect cost flat-rate is based, 558.216,90 see GA eligibility article) ALL WORK PACKAGES Flat-rate (%) 7% ATTENTION! Check that the rate is in line with the call conditions. Put 0% if you receive an EU Operating Grant and are not eligible to charge indirect costs” Total indirect costs 39.075,18 Total indirect costs 39.075,18 TOTAL COSTS PARTICIPANT 597.292,08 PROJECT INCOME EU CONTRIBUTION (GRANT) Amount (EUR) Total costs 597.292,08 Single Funding rate (%) 80% ATTENTION! Enter funding rate from the call conditions. Maximum EU contribution 477.833,66 Requested EU contribution 477.833,65 ATTENTION❗ In order to avoid rounding issues, please request 1 cent less than the maximum EU contribution. EU CONTRIBUTION 477.833,65 REVENUES AND CONTRIBUTIONS BY THIRD PARTIES Revenues Income generated by the action Amount Description of the income (type of generated income and (EUR) number of users, etc) ALL WORK PACKAGES Estimated income generated by the action 0,00 Total income generated by the action 0,00 Revenues 0,00 In-kind contributions by third parties Associated with document Ref. Ares(2023)8598037 - 14/12/2023 In-kind contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose etc) ALL WORK PACKAGES Estimated in-kind contributions by third parties 0,00 Total in-kind contributions 0,00 In-kind contributions 0,00 Financial contributions by third parties Financial contributions by third parties Amount Description of the contribution (type of contribution, (EUR) donor, purpose, etc) ALL WORK PACKAGES Estimated financial contributions by third parties 0,00 Total financial contributions 0,00 Financial contributions 0,00 TOTAL REVENUES AND CONTRIBUTIONS BY THIRD PARTIES 0,00 OWN RESOURCES Amount (EUR) Own resources 119.458,43 OWN RESOURCES 119.458,43 TOTAL INCOME PARTICIPANT 597.292,08 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 Project acronym: EU-WISH Participant short name: CIPH Participant PIC: 998128255 CONSOLIDATED COSTS PER WORK PACKAGE (PER PARTICIPANT) COSTS PER WORK PACKAGE A.1 Employees C. Purchase costs D. Other cost categories A.2 + A.3 Natural persons B. Subcontracting E. Indirect costs under direct contract and A.4 SME owners costs Total seconded persons C.1 Travel and C.3 Other goods, D.1 Financial support to C.1 Travel C.1 Accommodation C.1 Subsistence C.2 Equipment subsistence work and services third parties e = flat-rate * (a1 + a2 + a3 + a5 + b [+ a1 - a2 a3 b c1 c1a c1b c1c c2 c3 d1 c1] + [c1a + c1b + c1c] + c2 + c3 + d1 + d2 + d3 + d4 + d5 + d6) WP1 WP1 2.972,82 0,00 0,00 8.056,00 2.952,00 2.656,00 2.448,00 0,00 4.000,00 0,00 15.028,82 WP2 WP2 2.003,48 0,00 0,00 0,00 0,00 0,00 0,00 0,00 2.000,00 0,00 4.003,48 WP3 WP3 4.006,96 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 4.006,96 WP4 WP4 4.006,96 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 4.006,96 WP5 WP5 41.291,65 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 41.291,65 WP6 WP6 26.751,20 0,00 5.000,00 0,00 0,00 0,00 0,00 0,00 9.000,00 0,00 40.751,20 WP7 WP7 147.127,83 0,00 46.000,00 0,00 0,00 0,00 0,00 72.000,00 184.000,00 0,00 449.127,83 TOTAL COSTS PARTICIPANT 228.160,90 0,00 51.000,00 8.056,00 2.952,00 2.656,00 2.448,00 72.000,00 199.000,00 0,00 39.075,18 597.292,08 Associated with document Ref. Ares(2023)8598037 - 14/12/2023 START (DETAILED BUDGET TABLE (AG) — PROPOSAL/GRANT PREPARATION) PROJECT DATA Project number: 101140460 Project acronym: EU-WISH Participant short name: DGS Participant PIC: 986364095 WORK PACKAGES & TRAVELS Index Name Description Number of travels Delete 1 WP1 Description 1 3 2 WP2 Description 2 3 WP3 Description 3 4 WP4 Description 4 5 WP5 Description 5 6 WP6 Description 6 7 WP7 Description 7 a Associated with document Ref. Ares(2023)8598037 - 14/12/2023 DETAILED BUDGET TABLE (ACTION GRANTS) Project number: 101140460 20-10-2023 14:12 Project acronym: EU-WISH Participant short name: DGS Participant PIC: 986364095 ATTENTION: This table should be filled out one per participant (beneficiary, affiliated entity) ATTENTION: This table may ONLY contain eligible costs (i.e. costs that comply with the eligibility rules of the grant agreement that is part of your call documents). At proposal stage and during grant preparation, it should contain estimated costs/income. Costs must be estimated in EUR. ATTENTION! List each budgeted cost item ONLY once in this table, for the main WP. ATTENTION! White cells mean that you are required to enter data. Blue cells are calculated automatically. ACTION GRANT BUDGET TABLE (PER PARTICIPANT) PROJECT COSTS A. Personnel costs Costs (actual or unit costs) Time Rate Total Also working for other work ! monthly rates allowed for budgeting because simpler to establish the approximate costs; cost reporting will have to (months/other of work on Type of rate (amount) (EUR) packages? YES/NO and which Description of project role/activities/responsibilities be done according to MGA (usually daily rates) the action) (monthly/other) WP a b c=a*b WORK PACKAGE 1 WP1 A.1 Employees (or equivalent) Scientific coordinator, responsible for overall scientific Senior experts/advisors/researchers monthly 4.521,09 0,25 1.130,27 YES. WP4, WP6 management of the project Assistant of scientific coordinator. Financial & administrat. officer; project administration, monitoring project Junior experts/advisors/researchers monthly 4.464,90 0,25 1.116,23 YES, WP2, WP3, WP4, WP6 expenses, preparation of financial reports. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 2.246,50 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 2.246,50 WORK PACKAGE 2 WP2 A.1 Employees (or equivalent) Associated withmanager, Project documentwillRef. Ares(2023)8598037 provide strategic project - 14/12/2023 management support to Scientific Coordinator, and will be Project managers monthly 2.103,18 1,00 2.103,18 YES. WP5, WP6 responsible for the contributions for the dashboard and IT platform. Assistant of scientific coordinator, will be responsible for the contributions for the dashboard and IT platform and Senior experts/advisors/researchers monthly 4.464,90 0,50 2.232,45 YES. WP1, WP3, WP4, WP6 with the communication officer of DGS, coordinating the PR and communication activities Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total employees (or equivalent) 4.335,63 A.2 + A.3 Natural persons under direct contract and seconded persons Select a staff category monthly 0,00 0,00 0,00 Select a staff category monthly 0,00 0,00 0,00 Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00 Total natural persons under direct contract and seconded persons 0,00 A.4 SME owners and natural person beneficiaries without salary SME owners/natural person beneficiaries without salary daily 0,00 0,00 0,00 Total SME owners and natural person beneficiaries without salary 0,00 Total personnel for this WP 4.335,63 WORK PACKAGE 3 WP3 A.1 Employees (or equivalent) Public Health Emergencies coordination. Participation in the work and preparation of documents about evaluation Senior experts/advisors/researchers monthly 4.464,90 0,50 2.232,45 NO. and inclusion of wastewater surveillance in public health preparedness plans. Assistant of scientific coordinator, will assist in the evaluation of implementation and impact of the Junior experts/advisors/researchers monthly 4.464,90 0,50 2.232,45 YES, WP1, WP2, WP4, WP6 surveillance system, as well as in the inclusion of the system in the public health preparedness plans. Other [category 1] monthly 0,00 0,00 0,00 [category 2] monthly 0,00 0,00 0,00
Allikas: Terviseamet dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel