Majandus- ja Kommunikatsiooniministeerium · 15. märts 2021
Viit
8-7/1631-1
Registreeritud
15. märts 2021
Dokumendi liik
Väljaminev kiri
Adressaat
Riigi Tugiteenuste Keskus, Ettevõtluse Arendamise Sihtasutus
Saabumis/saatmisviis
DVK, e-post
Funktsioon
8 Toetuste rakendamine
Sari
8-4 Euroopa majanduspiirkonna ja Norra toetuste ning muude toetuste elluviimine
Toimik
8-4/24-46
Vastutaja
Tanel Tomson (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Majandusarengu valdkond, Välisvahendite osakond)

Failid

  • 📎24.4-717-05041631-1 15.03.2021 Väljaminev kiri.asice456 KB

Sisu (failidest)

ANNUAL PROGRAMME REPORT FM14-21 Estonia EE-INNOVATION Competitiveness 2020 1 A. EXECUTIVE SUMMARY “Green ICT” programme objective is increased value creation and sustainable growth in Estonia’s private sector. Programme aims to stipulate and develop innovation-led long-term business cooperation between Estonia and Norway by initiating bilateral cooperation projects and events. Programme has three focus areas: Green Industry Innovation, ICT and Welfare Technology. The Programme is implemented through a small grant scheme (hereinafter SGS), two open calls and two pre-defined projects. This report shall mainly consist of the overview of the results of SGS and first main call, also about progress made of the results framework. SGS projects were all completed in the previous reporting period. SGS resulted with 42 implemented projects and payments done in total amount of 691,895.79 euros. In the current reporting period, monitoring related activities have been completed. First main call was opened for submission of applications on February 1st, 2020 and closed on March 31st, 2020. 25 projects were awarded for a grant in total grant sum of 11,770,901.58 euros. First call results demonstrated the high relevance of SGS as 14 out 25 awarded projects originated from SGS. Due to Covid-19 and global lockdowns in spring, the call received fewer applications than initially expected, which is the reason behind the modest budget execution. First call budget remainder was 7 237,202.25 euros in total. In order to achieve the objectives of the programme's results framework, a second call was announced in November 16th, 2020, which shall remain opened until February 1st, 2021. Second call was opened for applications under two focus areas: Green Industry Innovation (budget 4,779,956.05 euros) and Welfare Technology (budget 2,457,246.20 euros). Significant progress has been on bilateral outcome, as first main call provided 16 comprehensive partnerships between Estonian and Norwegian companies. EE-INNOVATION- 0059 “Roofit.solar process innovation for developing software and automated production line” implemented by Roofit Solar Energy OÜ in partnership with Norwegian company Søran AS and EE-INNOVATION-0069 “AutoMVA” implemented by IPDx Diagnostics OÜ in cooperation with Oslo University Hospital and Oslo Diabetes Research Centre are set as good project examples on bilateral cooperation under the first call. Two bilateral events were organised during the reporting period, which also contribute to the outcomes as are focused to the strengthening bilateral relations between Norway and Estonia. Green ICT programme website www.eas.ee/norwaygrants includes programme scope, calls, events, application information and relevant deadlines. Programme had 38 media coverages in total, including press releases and articles on launching the two main calls and supported projects in national newspapers and online media. As a good practice, press releases were prepared as a trilateral cooperation between the Programme Operator (hereinafter PO), Implementing Agency (hereinafter IA) and the Royal Norwegian Embassy in Tallinn, to ensure that the information reaches relevant target groups; and have the maximum media coverage in Estonia. 1 B. PERFORMANCE 1. Programme context The spread of the coronavirus from the start of 2020 had a major impact on the performance of the Estonian economy and of the economy of the whole world. The economy of the euro area contracted by almost 12%, which is the largest drop in the history of the single currency area. Assistance measures taken by governments softened the drop. There has been a partial recovery in different sectors after easing the restrictions in summer. The continuing uncertainty in the outlook overshadows the recovery in services particularly, while there is expectation to increases in orders in manufacturing sector. There is major uncertainty about future growth in the economy though. As the virus started to spread more actively again at the end of summer, it needs additional measures to keep it under control. The economy will grow slowly in 2021, and growth will accelerate in 2022. The latest economic forecast from the Bank of Estonia expects the Estonian economy to recover from the crisis in 2021 and to return to where it was before the crisis in the second half of next year. The outlook for the Estonian economy is uncertain though, as the pandemic remains impossible to predict despite the hopeful news about vaccines, and the developments in the economy may differ substantially from expectations. The economy will contract by 2.5% this year. This is a much softer decline than was feared when the coronavirus crisis erupted, and is also one of the smallest in Europe. The relatively gentle blow means that exiting the crisis will be easier. If vaccination succeeds and the spread of the virus can be brought under control in first half of next year, the economy will start growing again in the second quarter of 2021 and GDP will grow by 2.9% in 2021. The rapid bounce back of the economy in the third quarter of 2020 demonstrated that it is able to grow rapidly after removal of restrictions. If the vaccination puts a stop to the pandemic soon enough, the coronavirus crisis will not have caused lasting harm to the economy, which will return to its growth track that was forecast before the crisis by 2022. Businesses have a lot of resources standing unused and the lending conditions of the banks remain favourable. A broad state budget stimulus will temporarily reinvigorate demand and consequently economic activity. The flexible labour market means that employment has dropped sharply and assistance will need to be directed to the unemployed. Although the recession in Estonia has so far been one of the smallest, employment has fallen further than in most other European countries. The labour market is flexible by international standards and this allowed employment to adjust rapidly to the new circumstances in spring and summer already, evidence for which is that the ending of the wage subsidy was not followed by a wave of redundancies, and the number of redundancies did not rise in October and November 2020. The unemployment rate will still rise because of the second wave of the virus, and it will peak in early 2021 at a little above 10%, falling back to close to 7% by 2023. 2 Nevertheless, the outlook for the Estonian economy is uncertain. Although news of the vaccine has increased hope of a rapid exit from the crisis, the forecast continues to be surrounded by a great deal of uncertainty because the path of the virus and the restrictions imposed because of it and their impact on the economy can vary widely from expectations. Although the base scenario of the forecast is that the economy will grow by 2.9% next year, the negative scenario is that it could shrink by a further 1.8% next year. The wide spread of these forecasts is closely connected to the outlook for the euro area, where growth in 2021 is forecast to be between 0.4% and 6%. The major lack of clarity about foreign demand makes the outlook for the Estonian economy uncertain as well. Due to the described factors, participation of Estonian and Norwegian entrepreneurs in open calls of Green ICT programme has been slightly less active than expected. Still, those who have decided to participate have a clear vision how turning the products, services and solutions greener will give them advantage in long run. 2. Results Outcome 1: Increased competitiveness of Estonian companies within focus areas Green Industry Innovation, ICT and Welfare Technology Description and analysis of results SGS was finalised in the reporting period. There were 42 implemented projects and three terminated projects in SGS. Reasons behind termination varied from unsuccessful partner search to insufficient interest of the target groups that ended pursuing the initial developments. Payments were done in sum of 691,895.79 euros, in total. SGS budget surplus (508,104.21 in total) has been added to the main call budget. To summarize, SGS has demonstrated its importance and necessity in the course of preparations towards the main call. In total 24 SGS’s project-promoters (54%) applied for a grant in the first main call. Thorough preparations in SGS and successful partner search ensured companies with strong applications in the main call as 14 SGS projects out of 25 successfully received a grant in the first main call. For SGS, reporting period mainly consisted of monitoring activities, described in section C1 (Monitoring). First open call launched on February 1st and closed on March 31st, 2020. Call was open for submission of applications in three focus areas: Green Industry Innovation, Welfare Technologies and ICT. Altogether 44 applications were submitted with 18,196,380.26 euros total grant applied. Applicants showed the highest interest towards Green Industry Innovation with 25 application in total with 10,964,902.73 euros applied, followed by ICT (12 applications, 3,427,352.73 euros applied) and Welfare Technology (seven applications, 3,804,124.80 euros applied). Evaluation of the first main call projects took place from April until June 2020. Selection Committee meeting was held on June 18-19, 2020. As a result, Selection Committee proposed 3 to award grants to 26 applications with the total grant of 11,770,901.58 euros. Enterprise Estonia management board agreed with the proposition made by Selection Committee and decisions to award grants together with project contracts were signed by beginning of July 2020. 16 main call projects out of 26 are Estonian-Norwegian partnership projects, which present good preconditions for bilateral relations and long-term partnerships. Grant was distributed across focus areas as follows: Green Industry Innovation projects 17 (8,072,188.08 euros), ICT 4 (1,730,959.70 euros) and Welfare Technology projects 5 (1,967,753.80 euros). In September 2020, one project promoter decided to discard the received grant (EE- INNOVATION-0072 Centre of Food and Fermentation Technologies “Microbiome”, grant total 392,000 euros). Project promoter submitted the application to IA, explaining the reasons behind termination of the project. Reasons included impacts of Covid-19 pandemic, which ultimately require the Project Promoter to review its goals and substantially modify the planned R&D activities. Also, a large order for analyses of Project Promoter’s existing microcalorimeter had been cancelled, therefore the purchase of a microcalorimeter also had to be postponed and with this, the large part of the Microbiome project budget remaining unused (approximately 1/3). Another reason for termination was a recently signed preliminary agreement with the Estonian Defence Forces (https://mil.ee/en/defence-forces), which requires the Project Promoter to expand the project's planned activities and build on a wider range of nutrition research competencies and slightly different than planned in the project plan. Based on the above-mentioned considerations, IA annulled its decision to award the grant to Centre of Food and Fermentation Technologies project named “Microbiome”, grant total 392,000 euros retroactively from the entry into force of the initial decision. Project promoter has not received any payments; the released amount has been added to the Welfare Technology second call budget. In the context of the programme results framework, first main call presented rather good results. For Green Industry Innovation projects, the indicators are generally well achieved : Number of SMEs supported to develop new green products/services/processes (target 5, result 14)  Number of large enterprises supported to develop new products/services/processes (target 2, result 0)  Estimated annual CO2 emissions reductions (target 25 000 tons of CO2 equivalent per year, result 32 000 tons)  Estimated annual decrease of energy consumption of supported enterprises (target 5% MWh per year, prognosis based on applications 48 918 MWh per year)  Targets of the indicators related to application of new green products/services/processes were not met. Only 3 projects contribute to the achievement of the target value with 4 new green products/services/processes applied in the course of implementation of the projects: 2 SMEs (target value 15) and 1 large company (target 5). In addition, none of the large enterprises applied for a grant for the development of new products/services/processes. 4 In Welfare Technology focus area, the set indicator was “Number of SMEs supported to develop new welfare technology products/services/processes”. The set target was initially achieved as 5 SMEs were awarded for a grant. Due to the termination of one of the projects indicated above, the target has not been met with remaining 4 SMEs contributing to the achievement of the results. For ICT focus area, neither of the two objectives were met:  Number of SMEs supported to develop ICT products, services and processes (target 8, result 4)  Number of large enterprises supported to develop ICT products, services and processes (target 5, result 0) The call was successful in terms of social impact, resulting in 290 total new jobs to be created (target 100). Due to the large number of product development projects, the target for number of new products/services/processes was also well achieved (target 25, result 36). Bilateral indicator was not achieved. Only 16 projects out of 25 involved a Norwegian partner, which is below the set overall target (45). Establishing partnerships was more successful for companies that had previously started negotiations with Norwegian companies under SGS or using help of Enterprise Estonia or Innovation Norway, who mediated partner searches for Estonian companies. Finalizing the submission of the joint applications was scheduled to spring 2020, when Covid-19 lockdowns restricted travelling and thereby had negative impact on the partnership negotiations. Hence, partnerships established before the virus caused emergency situation definitely had a competitive advantage over other applicants. Although the bilateral target was not achieved, the supported partnerships are considered solid and well elaborated. Partners include reputable research and development institutions as Oslo University, Oslo University Hospital, Cancer Registry of Norway; also, well-known Norwegian companies as Vardar AS, ICB Digital AS, Incadea Norge AS and NXTech AS. To summarize the first main call, companies participating in the first main call were not too much into uptake of new technologies rather than product/service development (36 new products/services/processes developed vs 4 new products/services/processes applied). That can be explained with the agile business environment in Estonia, whereas the companies are small and eager to pursue new ICT-led products and services. In addition, industrial companies in Estonia are mostly small and medium sized companies, which was reflected in the programme results, too. SME-s presented rather active representation in the call while large companies participation remained modest (3). While Green Industry Innovation and Welfare Technology calls presented rather good results in the set indicators, ICT call did not achieve neither of the two targets. Considering that the indicators were set before the final budget breakdown between GII and ICT, the result can be reasoned with the small budgetary means (1,930,667 euros). Altogether 7 of the submitted applications were evaluated above the threshold, which all could have been supported if there hadn’t been aforementioned budgetary constraints. 5 Due to Covid-19 and global lockdowns in spring, the call received fewer applications than initially expected, which is the reason behind the modest budget execution. First main call budget remainder was 7,237,202.25 euros in total. In order to achieve the objectives of the programme's results framework, a second call was announced in November 16th, 2020. Call will remain opened until February 1st, 2021. Call budget has been divided between two focus areas: Green Industry Innovation and Welfare Technology: 1. Green Industry Innovation second call budget is 4,779,956.05 EUR 2. Welfare Technology second call budget is 2,457,246.20 EUR It is likely that the second call will have a positive impact on the indicators that remained unachieved in the first call. However, considering the continuing situation with Covid-19 and even more limited budget compared to the first call, bilateral indicators might not receive an excessive impact in the second call either. Pre-defined projects There are two proposals for pre-defined projects submitted:  “Open Cyber Range”;  “Health Sense”. The goal of the predefined project "Health Sense" is to develop a secure data storage, integration, access and analysis toolkit in order to provide large, complex and detailed sets of health and lifecycle data for the public sector, private sector and R&D institutions. Raising the availability of health and lifecycle data enhances the creation of new products, services and solutions by the private sector, novel interventions by the public sector and relevant scientific knowledge by the R&D communities in order to raise life expectancy and prolong healthy life years of people. Application of “Health Sense” project has already gone through the appraisal process with positive result. Ministry of Social Affairs will start the implementation of the project in partnership with Health and Welfare Information Systems Center, Tallinn University of Technology, University of Tartu, Helse West IKT and Western Norway University of Applied Sciences in February 2021. Main objectives of the predefined project "Open Cyber Range" are to create a platform for (new) cybersecurity companies to develop, test and validate their innovative products, create a launch pad for new products to emerge to the market, promote security thinking in private sector and educate better workforce for the private companies. PO has received the final application of “Open Cyber Range” project and appraisal of the project application will start in the first quarter of 2021. Bilateral Outcome: Enhanced collaboration between beneficiary and donor state entities involved in the programme 6 Analysis of bilateral relations and achievements Significant progress has been on bilateral outcome, as first main call provided 16 comprehensive partnerships between Estonian and Norwegian companies. In most cases, partnerships are for product development or process innovation. In such projects after development activities at a later stage of the project the product / service is validated in the parties' supply chain. For example:  development of a marine certified ultracapacitor modules (Grace project ID: EE-INNOVATION- 0049) implemented by Skeleton Technologies OÜ in partnership with NXTech AS;  development of renewable energy map application "ReFinder" (Grace project ID: EEINNOVATION-0041), implemented by Sunly OÜ and partner Vardar AS;  “Roofit.solar process innovation for developing software and automated production line” project (Grace project ID: EEINNOVATION-0059), implemented by project promoter Roofit Solar Energy OÜ and partner Søran AS. The latter project originated from SGS and is considered as a good example from the first main call. Project was also presented in the annual meeting of the EEA and Norway Grants in August 2020. See the short video about Roofit Solar project at IA Youtube channel: https://youtu.be/DcC-yZ6-epw. Norwegian universities mainly provide sectoral expertise to the Estonian companies, especially in Welfare Technology projects where university knowledge for research and development is essential for successful implementation of the projects. This is well presented in the project “AutoMVA” (Grace project ID: EE-INNOVATION-0069) implemented by Estonian company IPDx Diagnostics OÜ in cooperation with Oslo University Hospital and Oslo Diabetes Research Centre. This project also originated from SGS and is considered as another good example from the first main call. Project was also presented in the annual meeting of the EEA and Norway Grants in August 2020. Video about the project at IA Youtube channel: https://youtu.be/JojMoRl0zXM. In addition to the abovementioned, two bilateral events were organised at programme level, to attract companies to take part in programme and strengthen the already established contacts between the parties. These activities also contribute to the outcomes as are focused to the strengthening bilateral relations between Norway and Estonia. On March 2-3, 2020 “Green Industry and ICT Matchmaking” conference took place in Oslo, Norway. The study tour was organised by Innovation Norway and was targeted to all companies eligible for and aiming at participation in a call. The main aim of the event was to inform participants about opportunities the EEA and Norway Grants for the ICT and industrial sector, international cooperation and introducing good examples of digitalisation and ICT related projects. Conference provided participants a good platform for matchmaking and meetings with potential partners. 10 Estonian companies participated in the event, five of whom were awarded with the grant from the first main call in May 2020 (Energex Energy Experts OÜ, Roofit Solar Energy OÜ, Waybiller OÜ, Netcorp OÜ, Modern Mobility OÜ). 7 Conference website: https://green-industry-and-ict-matchmaking.b2match.io/ Conference agenda: https://green-industry-and-ict-matchmaking.b2match.io/agenda Second bilateral event “International Green Industry Innovation and ICT webinar” was held virtually due to Covid-19 restrictions on December 15. The main aim of the event was to inform about different funding opportunities under the EEA and Norway Grants and provided a platform to match potential companies that would like to cooperate on a project. The focus on the Green ICT programme was to attract Estonian and Norwegian companies to participate in the second main call. 15 Estonian companies attended the webinar, for example Columbus Eesti AS, Unsinkable Robotics OÜ, Green Tiger, Ekotekt OÜ. Webinar was organized in close cooperation between IA and IN. Webinar website: https://green-industry-innovation-ict.b2match.io/ Webinar agenda: https://green-industry-innovation-ict.b2match.io/agenda Cooperation with DPP demonstrated strong lead in organising bilateral events. As bilateral funds enable to organise joint bilateral events between different business programmes, DPP has taken strong initiative to arrange such “umbrella” events that involve several beneficiary countries. This provides various matchmaking opportunities and sets a ground basis for partner search in all participating countries. In terms of DPP involvement in programme, the comprehensive knowledge and experiences has sufficiently supported the evaluation process of the first open call. IN was responsible of evaluating the bilateral partnerships in the applications, which resulted with timely and thorough assessments. Due to DPP active involvement in Cooperation Committee meetings, all the essential topics are mutually deliberated prior any enforcements. In 2020, one Cooperation Committee meeting was organised. Cooperation Committee meeting in June was mainly focused on first main call results, but also on upcoming bilateral events and preparations towards the second main call opening in November 2020. The next Cooperation Committee meeting will be held in 2021 due to ongoing call as well as last minute preparations on starting the pre-defined projects. 3. Implementation Conformity with specific requirements There are following conditions set in PA. 1. The National Focal Point shall ensure that the Programme Operator, prior to signing a project contract for pre-defined project no. 1 “Open Cyber Range (OCR)” and no. 2 “Health Sense”, carries out an external and independent appraisal of the project, in order to verify its quality and contribution to the objectives of the Programme as well as compliance with EU and national legislation. Project “Health Sense” has gone through the appraisal process with positive result. 8 PO has received the final application of “Open Cyber Range” project and appraisal of the project application will start in the first quarter of 2021. 2. No costs shall be eligible under pre-defined project no. 1 “Open Cyber Range (OCR)” and no. 2 “Health Sense” before the detailed descriptions and budgets for these pre-defined projects have been submitted to and approved by the NMFA. PO has submitted the detailed description and budget of the “Health Sense” project to Financial Mechanism Office and it has approved the application. PO will submit the detailed description and budget of the “Open Cyber Range” project to Financial Mechanism Office shortly after appraisal. 3. The Programme Operator shall submit the summary description of the procedure for the selection of projects to the NMFA for approval, prior to the publication of the small grant scheme and call for proposals foreseen under this programme. The programme agreement shall be amended accordingly. Programme agreement Annex II set the operational rules for the programme. Programme agreement was amended with the procedure for the selection of projects in small grant scheme and main call. The programme agreement has been amended accordingly. 4. The Programme Operator shall submit a communication plan for the programme to the NMFA for approval, prior to the publication of the small grant scheme and call for proposals foreseen under this programme. Communication plan has been sent to the FMO prior to the publication of the small grant scheme. Cooperation with International Partner Organisations (IPOs) There's no cooperaration with IPOs foreseen in this programme. C. LEARNING 1. Monitoring IA monitors project promoters granted under the Programme through verification of reports, procurements and payment claims, also conducting on-the-spot inspections and follow-up inspections (in the course of implementation of main call projects). Upon verification of payment claims, reports and procurements and conducting on-the-spot inspections, IA internal procedures “Inspection activities” shall be followed, as stated in the Management and Control Systems. Inspection activities include on-the-spot activities according to the programme’s risk assessment, control on procurement activities and results control (including examination of results and involvement of experts, if necessary, i.e. for more complex projects). The main purpose of the on-the-spot inspection is to obtain additional assurance on the eligibility of costs, the progress of the project results and the objects, services or 9 developments supported, where it is not possible to verify without a site visit. On-site inspections are carried out by IA monitoring specialists and project managers. 5 SGS projects were monitored in the previous reporting period, current period consisted of the monitoring activities for the remaining 37 projects. All SGS related control activities by IA have been completed in the reporting period, payments in sum of 691 895.79 euros for 42 project promoters have been made in total. SGS final budget surplus in sum of 86 997.36 euros has been added to the second main call budget. For all SGS projects, IA carried out the following control activities:  Examination on the activity reports to ensure the implementation of the activities set out in the application (incl. prepared documents, for example project plan, environmental impact analysis; partner search progress and participation in the main call);  Verification of the payment claims, including cost eligibility check and compliance with the objectives of the programme;  Grant payments. All payments have been granted by IA under the terms and conditions established in the project contract as a final payment. IA monitoring unit did not conduct any on-the-spot inspections in the reporting period for the SGS projects, because of the preparational nature of the projects (compilation of project plans, partner search etc.) and projects mainly resulted with documentation. Document control and cost verification for such projects do not require on-site control. Instead, project activities and prepared documents were controlled as desk work electronically. However, on-site-visits will be planned to conduct for main call projects, in order to ensure the purposefulness of the use of programme funds, compliance with legislation and eligibility of project costs and fulfilment of information and communication requirements. On-site-visits for main call projects start in 2021 according to the risk assessment conducted by IA monitoring unit. Regarding main call, first projects started their activities in mid-July. First interim reports have already been submitted to IA and cost verification as well as compliance related activities are being processed. Based on main call risk assessment, IA monitoring unit shall conduct on-the-spot inspections for 50% of the projects in the focus areas of Green Industry Innovation and ICT. That means that half of the financed projects shall pass the on-site control procedures in addition to the customary control procedures in IA. Considering the higher maximum grant amount for Welfare Technology projects, the percentage for the on-the-spot inspections is 100%, which means that all projects financed under WT shall pass the on-site control procedures in addition to the customary control in IA (cost verification, compliance, results control etc). The list of all projects involved in sample for on-spot inspection shall be drawn up in early 2021 and presented in next annual report. Notifying of irregularities shall be based on Regulation No. 143 of the Government of the Republic of Estonia of 1 September 2014 “Conditions and Procedure for Deeming Costs to Be Compensated for out of Structural Assistance of the Period 2014–2020 as Eligible, Payment of Support and Making Financial Corrections” and recovery of the grant shall be based on the 10 Performance Agreement (signed between PO and IA), Programme Agreement and Regulation on the Implementation of the Norwegian Financial Mechanism 2014–2021. No irregularities have been notified in the reporting period. 2. Evaluation Final evaluation (ex post) of the programme’s implementation/impact will be carried out in 2024. 3. Lessons learned Considered as force majeure, the Covid-19 global pandemic proved to be a challenge when building new partnerships. Organising face to face meetings internationally was difficult or even impossible. Without the direct communication, the trust between the newly established partnerships remained rather weak to submit a joint application, especially for partners with very short communication history. In some cases, electronic communication channels could be used, but not always. As a lesson learned we see that limited communication has negatively affected the bilateral cooperation in the programme. That is also reflected in the bilateral indicators not achieved in the results framework. D. ANNEXES 1. Updated results (indicator achievements) 2. Communication 3. Overview of contracted projects 4. Risk management 5. Monitoring plan 6. Evaluation report 7. List of individual mobilities 11 Annex 1: Updated results (indicator achievements) Objective: Increased value creation and sustainable growth Outcome 1: Increased competitiveness of Estonian companies within focus areas Green Industry Innovation, ICT and Welfare Technology Achievements Achievements until end of December until end of 2020 Unit of Indicator Baseline previous Target Comment measurement reporting Numerator Denominator Value period First reductions occur in the course of implementation of Estimated annual CO2 emissions reductions Annual 0.00 0 (APR 2019) - - 0 25,000.00 the first main call projects (will (tons of CO2 equivalent per year) number be reported in the annual report on 2021). Estimated annual growth in turnover of Percentage N/A - 0 0 - 5.00 % - supported enterprises Estimated annual growth in net operational Percentage N/A - 0 0 - 5.00 % - profit of supported enterprises Estimated annual decrease of energy Will be calculated during the consumption of supported enterprises (in Percentage - - 0 0 - 5.00 % implementation of specific MWh) main call projects. Number of products/services/processes Implementation of the specific tested in the Open Cyber Range security Number 0.00 0 (APR 2019) - - 0 10.00 PDP has not started yet. platform Number of new Implementation of projects products/services/processes applied (new- Number 0 0 (APR 2019) - - 0 20 has recently started, there are to-the-enterprise) (disaggregated by sector) no results yet. Implementation of projects Number of registered applications for Number 0.00 0 (APR 2019) - - 0 5.00 has recently started, there are Intellectual Property Protection no results yet. Projects have not reported the Number of jobs created Number 0 0 (IFR 2020) - - 0 100 results yet. Gender 12 Female - - - - - 0 - - Male - - - - - 0 - - Not specified - - - - - 0 - - Age Children and youth (0-17) - - - - - 0 - - Young adults (18-29) - - - - - 0 - - Adults (30-64) - - - - - 0 - - Elderly (65+) - - - - - 0 - - Not specified - - - - - 0 - - Number of new Implementation of projects products/services/processes developed Number 0 0 (APR 2019) - - 0 25 has recently started, there are (disaggregated by sector) no results yet. Output 1.1: Enterprises supported to develop or apply innovative green products, services and processes Achievements Achievements until end of December until end of 2020 Unit of Indicator Baseline previous Target Comment measurement reporting Numerator Denominator Value period Number of large enterprises supported in Number 0 0 (IFR 2020) - - 0 15 - SGS to prepare projects for main call Revised, as there was an error Number of large enterprises supported to in statistics reported in IFR. apply new green Number 0 2 (IFR 2020) - - 1 5 Miscalculation in division of products/services/processes SMEs and large enterprises. Number of SMEs supported in SGS to Number 0 13 (IFR 2020) - - 13 30 - prepare projects for main call Number of SMEs supported to apply new green products/services/processes (new-to- Number 0 2 (IFR 2020) - - 2 15 - the-enterprise) Revised, as there was an error Number of SMEs supported to develop new in statistics. IA counted some Number 0 17 (IFR 2020) - - 14 5 green products/services/processes of the project promoters twice under different outputs. 13 Number of large enterprises supported to Two large enterprises were develop new green Number 0 2 (IFR 2020) - - 0 2 reported by mistake in IFR. products/services/processes Output 1.2: Enterprises supported to develop innovative ICT products, services and processes Achievements Achievements until end of December until end of 2020 Unit of Indicator Baseline previous Target Comment measurement reporting Numerator Denominator Value period Number of SMEs supported in SGS to Number 0 20 (IFR 2020) - - 20 25 - prepare projects for main call Number of SMEs supported to develop ICT Number 0 4 (IFR 2020) - - 4 8 - products, services and processes Number of large enterprises supported in Number 0 0 (IFR 2020) - - 0 6 - SGS to prepare projects for main call Number of large enterprises supported to develop ICT products, services and Number 0 0 (IFR 2020) - - 0 5 - processes Output 1.3: Enterprises supported to develop innovative welfare products, services and processes Achievements Achievements until end of December until end of 2020 Unit of Indicator Baseline previous Target Comment measurement reporting Numerator Denominator Value period Number of large enterprises supported in Number 0.00 0 (IFR 2020) - - 0 2.00 - SGS to prepare projects for main call Number of enterprises supported in SGS to Number 0 11 (IFR 2020) - - 11 8 - prepare projects for main call Promoter of project EE- Number of SMEs supported to develop new INNOVATION-0072 welfare technology Number 0.00 5 (IFR 2020) - - 4 5.00 “Microbiome” initiated the products/services/processes termination of project. Explanation regarding the 14 termination inserted to GRACE. Output 1.4: Open Cyber Range (OCR) is operational Achievements Achievements until end of December until end of 2020 Unit of Indicator Baseline previous Target Comment measurement reporting Numerator Denominator Value period Number of SMEs supported to test new products/services/processes in the Open Number 0 0 (IFR 2020) - - 0 15 Project has not started yet. Cyber Range Number of professional staff trained Number 0 0 (IFR 2020) - - 0 100 Project has not started yet. Gender Female - - - - - 0 - - Male - - - - - 0 - - Not specified - - - - - 0 - - Roma Roma - - - - - 0 - - Not specified - - - - - 0 - - Output 1.5: Health Sense data management platform developed and operating Achievements Achievements until end of December until end of 2020 Unit of Indicator Baseline previous Target Comment measurement reporting Numerator Denominator Value period Data collection, and publishing environment architecture and data analysis environment Binary No No (IFR 2020) - - No Yes - architecture developed and published Data collection and publishing Binary No No (IFR 2020) - - No Yes - procedures/tools in place and documented Data analysis procedures/tools in place and Binary No No (IFR 2020) - - No Yes - documented 15 Number of data mining/Artificial Intelligence pilot projects successfully Number 0 0 (IFR 2020) - - 0 3 - finished Number of professional staff trained Number 0 0 (IFR 2020) - - 0 10 - Gender Female - - - - - 0 - - Male - - - - - 0 - - Not specified - - - - - 0 - - Roma Roma - - - - - 0 - - Not specified - - - - - 0 - - Bilateral Outcome: Enhanced collaboration between beneficiary and donor state entities involved in the programme Achievements Achievements until end of December until end of 2020 Unit of Indicator Baseline previous Target Comment measurement reporting Numerator Denominator Value period 4.5, 6.52, Target is Survey ≥4.5, and carried an Level of satisfaction with the partnership Scale 1-7 - - - 5.08 - out on increase behalf of on the the FMO baseline value State type Beneficiary State - - - - - 3.50 - - Donor State - - - - - 6.67 - - Not specified - - - - - - - - 6.52, 4.5, Level of trust between cooperating entities Survey Target is Scale 1-7 - - - 5.25 - in Beneficiary States and Donor States carried ≥4.5, and out on an 16 behalf of increase the FMO on the baseline value State type Beneficiary State - - - - - 3.50 - - Donor State - - - - - 7 - - Not specified - - - - - - - - 50.00 %, Share of donor business partnerships which Target is continue after project implementation Percentage N/A - 0 0 - - minimum period 50% Number of jointly registered applications for Number 0.00 0 (APR 2019) - - 0 3.00 - Intellectual Property Protection Donor State Norway - - - - - 0 - - Iceland - - - - - 0 - - Liechtenstein - - - - - 0 - - Not specified - - - - - 0 - - 50, Target Share of cooperating organisations that is apply the knowledge acquired from bilateral Percentage N/A - 4 4 100.00 % - minimum partnership 50 % State type Beneficiary State - - - 2 2 100.00 % - - Donor State - - - 2 2 100.00 % - - Not specified - - - 0 0 - - - Bilateral Output 1: Bilateral partnerships supported Achievements Achievements until end of December until end of 2020 Unit of Indicator Baseline previous Target Comment measurement reporting Numerator Denominator Value period 17 Number of projects involving cooperation Number 0.00 1 (IFR 2020) - - 16 45.00 - with a donor project partner Donor State Norway - - - - - 16 - - Iceland - - - - - 0 - - Liechtenstein - - - - - 0 - - Not specified - - - - - 0 - - Number of staff from donor states in Number 0 0 (IFR 2020) - - 0 5 - exchanges Donor State Norway - - - - - 0 - - Iceland - - - - - 0 - - Liechtenstein - - - - - 0 - - Not specified - - - - - 0 - - Gender Female - - - - - 0 - - Male - - - - - 0 - - Not specified - - - - - 0 - - Type of exchange Online - - - - - 0 - - Physical - - - - - 0 - - 18 Annex 2: Communication summary a. Visibility of the Grants and the donors Communication plan 2017-2024 describes the Green ICT Programme communication goals, target groups and main messages. Focus of the communication is on promoting Green ICT programme: the focus, content and business opportunities for companies via bilateral cooperation. The main channel for the programme specific information is www.eas.ee/norwaygrants, which contains updated information about the calls, application documents, seminars etc. Website of PO https://www.mkm.ee/et/tegevused-eesmargid/valisvahendid/norra-ja- euroopa-majanduspiirkonna-finantsmehhanismid provides the main information on Norway Grants and programme “Green ICT”. It refers to the NFP website https://eeagrants.fin.ee and IA Programme website www.eas.ee/norwaygrants, which includes more specific information on programme, such as scope, calls, events, application information and relevant deadlines. IA social media channels https://www.facebook.com/EnterpriseEstonia/ and LinkedIn profile https://www.linkedin.com/company/enterprise-estonia are used to promote programme events and activities (articles, good examples, events). IA Youtube channel https://www.youtube.com/user/EnterpriseEstonia is used to present video material and best practices (i.e. project examples). NFP website http://eeagrants.fin.ee/en/ reflects a short description of the Green ICT programme with links to the IA website for more detailed information. b. Communication with the National Focal Point Communication and cooperation with NFP has been effective and smooth. All programme implementation related questions have been answered quickly, the exchange of information is considered sufficient. c. Website and social media The main channel for media communication is IA website. All press releases are shared in IA social media channels (Facebook, LinkedIN). Programme-specific information is published in programme website www.eas.ee/norratoetus (in Estonian) and www.eas.ee/norwaygrants (in English), including application information and documents, seminar ppt-s, videos etc. Press releases were issued both before the opening of the calls and after the closing of the call to introduce the results. As a good practice, joint communication of PO, IA and Royal Norwegian Embassy in Tallinn has been used to reach the target groups and achieve the maximum media coverage. IA, NFP and Embassy are active on sharing the news on their websites http://eeagrants.fin.ee/en/ and social media channels in Facebook. In addition to the programme level communication, projects have become active in sharing their project achievements in their social media channels. Roofit Solar Energy OÜ (https://www.facebook.com/Roofit.solar) and Eziil Production Intelligence OÜ (https://www.facebook.com/EziilProductionIntelligence/) are the companies who especially stand out in social media. 19 All supported projects from the first main call have started or already established their project websites as set in the Regulation on the implementation of the Norway Grants 2014-2021 - Annex 3: Information and communication requirements. d. Best practice examples A seminar was organised by IA to project promoters on July 14th, 2020. Seminar was targeted to project promoters that had been awarded to grant from the first call. The organization of such seminars is a standard IA practice for the smooth implementation of projects and to ensure the understanding of project reporting specifics. IA introduced the general rules on implementation, reporting and cost eligibility, procurement, payments, communication requirements etc. Altogether 50 participants from all 26 projects attended the seminar. Another seminar was held on November 16th prior second main call opening in order to introduce the conditions and requirements for submission of applications. This event was held electronically as a preventive measure of the coronavirus. e. Multimedia In the reporting period, “Green ICT” programme received 38 total references in the national and local newspapers and online media. Press releases issued by PO, IA and Norwegian Embassy were widely reflected in Estonian national newspapers (Äripäev, Postimees, Eesti Päevaleht) and online media: Delfi (www.arileht.delfi.ee), Postimees (www. majandus24.postimees.ee). Opening of the main calls were under special attention in ICT and industry publications, e.g. IT News (www.ituudised.ee), Industry News (www.toostusuudised.ee), Rohegeenius (www.rohe.geenius.ee). In addition, several articles were initiated on the topics covered by the programme. Media covered the opening of the calls as well as the results of the first call (most of them listed below in English, Russian and Estonian):  Enterprise Estonia launches €19 million Estonia-Norway cooperation program https://news.err.ee/1030648/enterprise-estonia-launches-19-million-estonia-norway- cooperation-program (Estonian Public Broadcasting, 01.02.2020)  Enterprise Estonia opens €7.2 million round Estonian-Norwegian program https://news.err.ee/1159598/enterprise-estonia-opens-7-2-million-round-estonian- norwegian-program (Estonian Public Broadcasting, 16.11.2020)  Эстонско-норвежская программа поддержит развитие устойчивого предпринимательства в Эстонии (Estonian-Norwegian program supports the development of sustainable entrepreneurship in Estonia) https://rus.err.ee/1030299/jestonsko-norvezhskaja-programma-podderzhit-razvitie- ustojchivogo-predprinimatelstva-v-jestonii (rus.err.ee)  Seitse miljonit eurot Norra raha ootab Eestist IT-projekte (Seven million euros is waiting for IT projects from Estonia) https://www.ituudised.ee/uudised/2020/11/16/seitse-miljonit-eurot- norra-raha-ootab-eestist-it-projekte (ituudised.ee)  EAS kutsub ettevõtteid osalema Eesti – Norra koostööprogrammi lisavoorus (Enterprise Estonia invites companies to participate in the additional call of the Estonian-Norwegian 20 cooperation program) https://majandus.goodnews.ee/eas-kutsub-ettevotteid-osalema-eesti- norra-koostooprogrammi-lisavoorus/? (goodnews.ee)  12 miljonit eurot Norra riigi raha jõudis Eesti IKT-firmadeni, lisavoor tuleb sügisel (12 million euros of Norwegian grants reached Estonian ICT companies, an additional call opened in autumn) https://www.ituudised.ee/uudised/2020/07/20/12-miljonit-eurot-norra-riigi-raha- joudis-eesti-ikt-firmadeni-lisavoor-tuleb-sugisel (ituudised.ee)  Rohe- ja tervisetehnoloogiate arendajad saavad rahasüsti (Developers of green and health technologies will receive a cash injection) https://www.foundme.io/uudised/2020/07/20/rohe-ja-tervisetehnoloogiate-arendajad- saavad-rahasusti (foundme.io)  EAS toetab 12 miljoni euroga Eesti-Norra koostööprojekte (Enterprise Estonia supports Estonian-Norwegian cooperation projects with 12 million euros) https://arileht.delfi.ee/news/uudised/eas-toetab-12-miljoni-euroga-eesti-norra- koostooprojekte?id=90498449 (arileht.delfi.ee)  EAS andis Eesti-Norra koostööprojektidele 12 miljonit (Enterprise Estonia provided 12 million for Estonian – Norwegian cooperation projects) https://majandus24.postimees.ee/7021358/eas-andis-eesti-norra-koostooprojektidele-12- miljonit (majandus24.postimees.ee)  EAS toetab 12 miljoni euroga Eesti – Norra koostööprojekte (Enterprise Estonia supports Estonian-Norwegian cooperation projects with 12 million euros) http://majandus.goodnews.ee/toetus-i-eas-toetab-12-miljoni-euroga-eesti-norra- koostooprojekte/? (goodnews.ee)  Kolm suunda. Milliseid teenuseid EAS tööstustele pakub? (Three directions. What services does Enterprise Estonia offer to industries?) (Eesti Tööstus)  Ülevaade EASi tootearenduse ja digitaliseerimise toetustest tööstusettevõtetele (Overview of Enterprise Estonia's product development and digitization grants for industrial enterprises) https://www.toostusuudised.ee/sisuturundus/2020/02/27/ulevaade-easi-tootearenduse-ja- digitaliseerimise-toetustest-toostusettevotetele (toostusuudised.ee)  EAS avas tööstuse ja rohetehnoloogiate taotlusvooru (Enterprise Estonia opened an application round for industry and green technologies) https://rohe.geenius.ee/rubriik/uudis/eas-avas-toostuse-ja-rohetehnoloogiate-taotlusvooru/ (geenius.ee)  Kuidas digitaliseerimine aitab meie tööstustel maailma tippu jõuda? (How will digitalization help our industries reach the top of the world?) https://majandus24.postimees.ee/6884770/kuidas-digitaliseerimine-aitab-meie-toostustel- maailma-tippu-jouda (majandus24.postimees.ee)  Taotle toetust! Norra eraldas Eesti firmade IKT-projektidele 19 mln eurot (Apply for a grant! Norway allocated 19 million euros to ICT projects of Estonian companies) https://www.ituudised.ee/uudised/2020/01/31/taotle-toetust-norra- eraldas-eesti-firmade-ikt-projektidele-19-mln-eurot (ituudised.ee) 21  Eesti-Norra koostööprogramm toetab tööstuse digitaliseerimist (The Estonian-Norwegian cooperation program supports the digitalization of Industry) https://www.toostusuudised.ee/uudised/2020/01/31/eesti-norra-koostooprogramm-toetab- toostuse-digitaliseerimist (toostusuudised.ee)  Kuidas digitaliseerimine aitab meie tööstustel maailma tippu jõuda? (How will digitalization help our industries reach the top of the world?) Postimees Some of the supported projects were also active in media communication, receiving considerable coverage in online media and newspapers:  Eziil Production Intelligence OÜ (project EE-INNOVATION-0053 “Development of Eziil production software for product-based production companies”, partners Nordic Shelter AS, Thorgate Digital OÜ, Energex Energy Experts OÜ, Nordic Shelter Production OÜ, Aktsiaselts VMT Tehased, Mobi Lab OÜ): o Viljandi idufirma lahendab Eesti tööstuste suurt probleemi (Start-up company from Viljandi solves a big problem of Estonian industries) – Eesti Päevaleht o Eesti tööstuste suurt probleemi lahendav Viljandi idufirma sai 1,2-miljonilise rahasüsti (Start-up from Viljandi solves a big problem of Estonian industries and received a 1.2 million investment) https://arileht.delfi.ee/news/uudised/eesti-toostuste-suurt- probleemi-lahendav-viljandi-idufirma-sai-1-2-miljonilise-rahasusti?id=91260213 (Delfi) o Eesti tööstuste suurt probleemi lahendav Viljandi idufirma sai 1,2-miljonilise rahasüsti (Start-up from Viljandi solves a big problem of Estonian industries and received a 1.2 million investment) https://sakala.postimees.ee/7078498/viljandi- tarkvaraarendajad-said-1-2-miljoni-euro-suuruse-rahasusti (Postimees) o Viljandist sirgunud tootmisidu Eziil korjas tuntud investoritelt 1,2 miljonit eurot ja suundub Ühendkuningriiki vallutama (Eziil received 1.2 million euros from well-known investors and goes to conquer the United Kingdom) https://digipro.geenius.ee/rubriik/uudis/viljandist-sirgunud-tootmisidu-eziil-korjas- tuntud-investoritelt-12-miljonit-eurot/ (Geenius) o Tootmisi digitaliseeriv idufirma Eziil sai 1,2 miljoni eurose rahasüsti (Digitalization of production start-up Eziil received 1.2 million euro cash injection) https://www.foundmio/uudised/2020/10/05/tootmisi-digitaliseeriv-idufirma-eziil- sai-12-miljoni-eurose-rahasusti (www.foundmio)  Roofit Solar Energy OÜ (projects EE-INNOVATION-0059 and EE-INNOVATION-0062 "Roofit.solar process innovation for developing software and automated production line”, implemented with Søran AS and "Roofit.solar product development"): o Eesti päikesekatuste tootja Roofit.solar siseneb tarkvaraärisse (Estonian solar roof manufacturer Roofit.solar enters the software business) - Article in electricity and energy magazine Elektriala 22 o Kiirelt arenev Eesti päikesekatuse tootja Roofit.solar arendab uusi tooteid (Roofit.solar, a rapidly developing Estonian solar roof manufacturer, is developing new products) – article in home and construction magazine TM Energia o Eesti päikesekatuste tootja Roofit.solar siseneb tarkvaraärisse (Estonian solar roof manufacturer Roofit.solar enters the software business) https://majandus.goodnews.ee/eesti-paikesekatuste-tootja-roofit-solar-siseneb- tarkvaraarisse/? (GoodNews) o Päikesekatuste tootja Roofit.solar laiendab tootmist (Roofit.solar, a manufacturer of solar roofs, is expanding production) https://www.foundme.io/uudised/2020/08/31/paikesekatuste-tootja-roofitsolar- laiendab-tootmist (www.foundme.io) o Eesti päikesekatuste tootja Roofit.solar sai hoogu juurde (Estonian solar roof manufacturer Roofit.solar received a large investment) http://majandus.goodnews.ee/eesti-paikesekatuste-tootja-roofit-solar-sai-hoogu- juurde/? (GoodNews) o Eesti päikesekatuste tootja Roofit.solar paneb peagi üles 100 korda rohkem katuseid (Estonian solar roof manufacturer Roofit.solar will soon install 100 times more solar roofs) https://digipro.geenius.ee/rubriik/uudis/eesti-paikesekatuste-tootja- roofit-solar-sai-miljoneid-tuge/ (digipro.geenius.ee) UpSteam Eesti OÜ (project EE-INNOVATION-0061 “Developing UpSteam P2P business model for car washing” implemented in cooperation with CityQ AS):  Mobiilset autopesuteenust pakkuv UpSteam lõi käed Norra ejalgratta tootjaga (UpSteam, a mobile car wash service, has joined hands with a Norwegian ebike manufacturer) https://keskkonnatehnika.ee/mobiilsetautopesuteenust-pakkuv- upsteam-loi-kaed-norra-e-jalgratta-tootjaga/ (keskkonnatehnika.ee) Roofit.Solar and Upsteam OÜ also participated in radio broadcast, where they introduced their projects and their experiences about participating in the Green ICT programme: https://www.aripaev.ee/raadio/episood/kogemus-koostoost-ehk-kuidas-saada-kasvul- pidurid-maha?fbclid=IwAR2tsGN7nsrMG72KxkVCHuozavY1bq-nKlttjuYn9w6f2qomlHcWw- zSmY8 (in Estonian). AS Chemi-Pharm (project EE-INNOVATION-0063 “Improving the production of disinfectants by full automating”):  Ruth Oltjer: tegime kevadel tootmise maailmarekordi (Ruth Oltjer: we set a world production record in spring) Eesti Päevaleht Chemi-Pharmi tehnikadirektor kriisiajast: tehas taheti ära osta (Chemi-Farm's technical director from the Covid-19 crisis: the production had interested buyers) https://www.aripaev.ee/lisa/2020/10/22/toostusuudised-22102020 (Äripäev), 23 https://www.toostusuudised.ee/uudised/2020/10/20/chemi-pharmi-tehnikadirektor- kriisiajast-tehas-taheti-ara-osta (toostusuudised.ee) 24 Annex 3: Overview of contracted projects # of % of donor Amount outcome Outcome Projects # project contracted budget partners contracted Outcome 1: Pre-defined 0 0 €0 0.00 % Increased Contracted through 26 15 € 12,162,902 48.59 % competitiveness of open calls Estonian companies Contracted through within focus areas 45 1 € 828,451 3.31 % small grants scheme Green Industry Innovation, ICT and Total Outcome 1 71 16 € 12,991,352 51.90 % Welfare Technology Programme Total 71 16 € 12,991,352 51.90 % 25 Annex 4: Risk management Programmatic risks Risk Risk Risk description Risk related to Likelihood Consequence Response type score N/A? Reducing social and economic 2 3 2.45 No disparities Description of Risk did not occur in the small grant scheme, but is carefully planned Programme is vaguely targeted and assessment criteria does not observed in the preparations of opening the main call. response support the outcomes. Description of Carefully set application criteria resulted in project proposals actual supporting the outcomes of programme. response Planned future Observation of projects continues. response Strengthening Both objectives 2 3 2.45 bilateral No relations Description of Preparation of the second open call targeted to be opened in the Programme implementation is obstructed due to many players planned autumn of 2020 was largely based on the experience gained in and mixed interest. Risk could result in unachieved programme response the first open call. (outcome) targets. Description of Programme outcomes have been well targeted, project actual promoters are chosen according to programme specific criteria response and therefore all the outcomes are reachable. Planned future PO and IA keep track on reaching the targets. response 26 Strengthening bilateral 2 3 2.45 No relations Description of SGS projects were targeted to finding partners, result will be Insufficient bilateral interest to implement joint cooperation planned observed in the main call participations. projects. Could result in low level of project cooperation and response failure in achieving the bilateral outcome. Description of Partner search database has been introduced and matchmaking actual events for entrepreneurs have been organised. response Planned future Organising additional partner search activities for contracted response projects could be considered. Strengthening Both objectives 2 3 2.45 bilateral No relations Description of We have planned to announce another open call already in Opening of calls delayed. planned autumn 2020, which should leave sufficient time buffer for Because of the long description please consult original document response implementation of projects. as uploaded. Description of actual Additional call for proposals has been launched as planned. response Planned future Necessity of additional targeted call will be discussed in mid 2021 response to have sufficient time for implementation of projects. Operational risks Risk Risk Risk description Risk related to Likelihood Consequence Response type score N/A? Public procurement conditions not clear for Project promoters. Both objectives 2 2 2.00 No 27 Ref. Regulation Art 8.15. State aid restrictions in main call apply to projects, which Description of mitigates procurement risks in projects. Risk is scored to "3" planned Because of the long description please consult original document instead of "4" and will remain under monitoring in projects in response as uploaded. main call. Description of All the rules concerning public procurement have been actual introduced and project promoters are welcome to ask guidance response whenever it is necessary. Planned future Rules of procurement are being introduced on regular basis. response Reducing social and economic 3 3 3.00 No disparities Description of All the planned mitigation measures will be addressed in State aid rules not clear for project promoters. Risk could result in planned councelling of applicants during the application process. project irregularities (i.e. miscalculated eligible activites, costs and response aid intensity). Description of Different state aid categories have been described in detail in actual conditions of call for proposal. response Planned future Councelling of applicants continues in implementation phase. response Reducing social Transfer of application and monitoring process into centralised and economic 3 3 3.00 No information system administered by National Focal Point may disparities cause need for additional manual data insertion by Implementing Description of Implementing Agency seeks for automated solution in Agency, which may cause errors in data. planned cooperation with National Focal Point. response Overall risk of the programme 28 Risk Likelihood Consequence score OVERALL RISK OF THE PROGRAMME 2 3 2.45 29 Annex 5: Monitoring plan Please note this Annex is uploaded separately and is not visible in this document. Please download and print separately if needed. Annex 6: Evaluation report Not Available 30 Laura Pikkoja Riigi Tugiteenuste Keskus [email protected] Meie 15.03.2021 nr 24.4-7/17-0504/1631-1 Programmi "Green ICT" 2020. aasta aruande edastamine Austatud Laura Pikkoja Edastame Eesti-Norra koostööprogrammi „Green ICT“ 2020. aasta aruande. Lugupidamisega (allkirjastatud digitaalselt) Keit Kaadu juhataja Lisa: APR EE-INNOVATION 2020.pdf Lisaadressaat: Ettevõtluse Arendamise Sihtasutus Katrin Tael 7153405 [email protected] Suur-Ameerika 1 / 10122 Tallinn / 625 6342 / [email protected] / www.mkm.ee Registrikood 70003158