Ministry of Economic Affairs and Communications
Study on the implementation of the mining concession in Estonia. Comparative analysis
of the mining legislation in certain countries. Suggestions for Estonia.
1. Background
The Ministry of Economic Affairs and Communications is preparing an analysis and initial
proposals for the mineral resource concession (exploration and mining). For certain future
(strategic) mineral resources, such as fertilizers and metal raw materials (phosphorite,
glauconite sandstone, graptolite argillite, iron ore) and possibly also limestone, it may be
appropriate for the state to consider establishing a exploration and mining concession.
The aim is to ensure that the state plays a leading role in determining the conditions for the
use of such resources and to earn the maximum benefit from the use of resources for society,
at the same time taking into account the needs of companies that take significant business
risks to use the resource.
The concession allows the state to select a developer, whose tender also takes into account
long-term socio-economic, environmental and security aspects (incl. introduction of the best
technology, development of optimal value-added chains and local valorization, and post-
closure development of the mined area).
2. Expected outcomes
Jurisdictions to study: 5-6 European countries (must include Sweden, Finland) and some
countries or areas outside Europe.
The outcome of this analysis consists of following parts:
1. Principles for granting exploration and mining licenses.
2. Concession time frames, fees, royalties/taxes (including royalty rates and royalty base)
and other relevant aspects.
3. Concession tendering process in general for non-fuel minerals, details of these for the
relevant countries.
4. State partnership in the concession, examples form the world.
5. Suggestions for Estonia.
2.1 Structure of the analysis
2.1.1 Principles for granting exploration and mining licenses.
In this section principles for granting exploration and mining licenses are explained and an
insight into the different systems for regulating mineral rights is given. The connection
between mineral rights and land ownership is explained.
2.1.2 Concession time frames, fees, royalties/taxes (including royalty rates and royalty
base) and othe relevant aspects.
Overview of concession time frames, fees, royalties/taxes (including royalty rates and royalty
base) and other relevant aspects is given. Examples from the different countries indicated in
the Jurisdictions of study.
2.1.3 Concession tendering process in general for non-fuel minerals, details of these for
the relevant countries.
Overview of concession tendering process for non-fuel minerals in general: concession
tender, qualification conditions, principles and criterias of the evaluation, relevant licences,
valorization. The different approaches are given:
a) exploration concession and a mining concession;
b) exploration permit leading to a mining concession.
2.1.4 State partnership in the concession, examples from the world.
Overview of the relevant countries is given. State participation conditions (shares, etc).
2.1.5 Suggestions for Estonia.
In this section the suggestion how Estonia should implement the mining concession is given.
The proposals for appropriate legislation.
All data given in this analysis is referenced accordingly with usable links.
3. Methodology
With application the methodology approach is to be provided by the tenderer. The description
is one of the evaluation criteria.
Additionally, to the methodology the tenderer will submit a suggested timeline which does
not exceed 14 weeks. Timeline contains:
a. interim report for each part (possible to submit parts simultaneously) b.
b. feedback time one week for contracting authority
c. possible improvements according to feedback from contracting authority
d. submission of the full report
4. Timelines
The analysis must be delivered by latest 14 weeks from the signing of the contract. This
timeframe must include submission of the preliminary results and time for possible additions
5. Price of the analysis
The price of the analysis is expected to be around 15 000 euros, excluding VAT.
The price of the tender is to be quoted in euro.
The price of tender shall include all expenses, taxes (except for VAT), fees and other charges
that the tenderer has to pay or bear in relation to the service.
The quoted price of the tender is final. The tenderers may not request the contracting authority
for additional payments.
The price quoted may not be revised in line with exchange rate movements.
6. Evaluation
The tender will be awarded using the following criteria:
a. Tenderers understanding of the assignment and alignment with the concept needs of
contracting authority. This is evaluated through described methodology in the
tenderers offer – 60 % of the final evaluation.
- 60 points will be awarded, when the methodology of the study is purposeful and
described in detail, the selection of the methodology is clearly and understandably
justified.
- 36 points will be awarded, when the methodology of the study is in general fit for
purpose and partially described, the selection of the methodology is clearly and
understandably justified.
- 24 points will be awarded, when the methodology of the study is described in general
and/or the selection of the methodology is not clearly and understandably justified.
- 0 points will be awarded, when the chosen methodology for the study will not lead
to a successful completion of the study. The tenderers have not clearly explained their
reasoning behind their methodology.
b. Price (up to 40 points) - The lowest price tender will receive 40 points. - The other
tenders will receive points according to the following formula:
lowest submitted price
40 x
submitted price
7. Declining the offers
Contracting authority has the right to decline any offers that exceed the expected price of the
analysis or does not fit to set criteria of this tender. Contracting authority has the right to
dismiss this call if during the call new information has been revealed that will make the
content of this call meaningless.
8. Rights of authorship
Any right of authorship is given to the contracting authority. The fee is included in the price
of the offer. Tenderers will have to confirm that they have the right to assign the analysis to
the contracting authority.
9. Acceptance of tender and other conditions
The successful tender shall be the most economically advantageous tender. By submitting a
tender, the tenderers confirm that they have sufficiently examined the contract documents and
agree with the conditions specified in these documents. The tender must comply with all the
conditions specified in the contract notice and contract documents.
Mineral legislation and jurisdiction
a brief overview of certain aspects in
Sweden, Finland, Poland, Hungary,
Portugal, Ontario/Canada and
Queensland/Australia
A study for the
Ministry of Economic Affairs and Communications, Estonia
FIRST DRAFT REPORT: BASE DATA
Magnus Ericsson and Olof Löf, April 2021
1
Contents
Sweden .................................................................................................................................................... 5
1. Principles for granting exploration and mining licenses ................................................................. 5
Mineral policy/strategy ................................................................................................................... 5
Key legislation and permits ............................................................................................................. 5
Ownership ....................................................................................................................................... 6
2. Fees, royalties/taxes ........................................................................................................................ 6
Concession time frames ...................................................................................................................... 7
3. Concession tendering process for non-fuel minerals...................................................................... 7
4. State participation ........................................................................................................................... 7
Poland...................................................................................................................................................... 8
1. Principles for granting exploration and mining licenses ................................................................. 8
Mineral policy/strategy ................................................................................................................... 8
Key legislation and permits ............................................................................................................. 8
Ownership ....................................................................................................................................... 9
2. Fees and royalties ............................................................................................................................ 9
Concession time frames ................................................................................................................ 10
3. Concession tendering process for non-fuel minerals.................................................................... 11
4. State participation ......................................................................................................................... 11
Finland ................................................................................................................................................... 12
1. Principles for granting exploration and mining licenses ............................................................... 12
Mineral policy/strategy ................................................................................................................. 12
Key legislation and permits ........................................................................................................... 12
Ownership ..................................................................................................................................... 13
2. Fees, royalties/taxes ...................................................................................................................... 13
Concession time frames ................................................................................................................ 14
3. Concession tendering process for non-fuel minerals.................................................................... 14
4. State participation ......................................................................................................................... 14
Hungary ................................................................................................................................................. 16
1. Principles for granting exploration and mining licenses ............................................................... 16
Mineral policy/strategy ................................................................................................................. 16
Key legislation and permits ........................................................................................................... 16
Ownership ..................................................................................................................................... 17
2
2. Fees, royalties/taxes ...................................................................................................................... 17
Concession time frames ................................................................................................................ 17
3. Concession tendering process for non-fuel minerals.................................................................... 17
4. State participation ......................................................................................................................... 18
Portugal ................................................................................................................................................. 19
1. Principles for granting exploration and mining licenses ............................................................... 19
Mineral policy/strategy ................................................................................................................. 19
Key legislation and permits ........................................................................................................... 19
Ownership ..................................................................................................................................... 20
2. Fees, royalties/taxes ...................................................................................................................... 20
Concession time frames ................................................................................................................ 21
3. Concession tendering process for non-fuel minerals.................................................................... 21
4. State participation ......................................................................................................................... 21
Queensland (Australia) .......................................................................................................................... 22
1. Principles for granting exploration and mining licenses ............................................................... 22
Mineral policy/strategy ................................................................................................................. 22
Key legislation and permits ........................................................................................................... 22
2. Fees, royalties/taxes ...................................................................................................................... 23
Concession time frames ................................................................................................................ 24
3. Concession tendering process for non-fuel minerals.................................................................... 24
4. State participation ......................................................................................................................... 25
Ontario (Canada) ................................................................................................................................... 26
1. Principles for granting exploration and mining licenses ............................................................... 26
Mineral policy/strategy ................................................................................................................. 26
Key legislation and permits ........................................................................................................... 26
Ownership ..................................................................................................................................... 27
2. Fees, royalties/taxes ...................................................................................................................... 28
3. Concession tendering process for non-fuel minerals.................................................................... 28
4. State participation ......................................................................................................................... 28
Figure 1 Permits for opening mines in Sweden (simplified). .................................................................. 5
Figure 2 Permits for opening mines in Poland (simplified) ..................................................................... 9
Figure 3 Permits for opening mines in Finland (simplified) .................................................................. 12
Figure 4 Permits for opening mines in Hungary (simplified). ................................................................ 18
Figure 5. Permits for operating mines in Portugal (simplified) ............................................................. 20
3
Figure 6. Permits for operating mines in Queensland (simplified) ....................................................... 23
Figure 7 Permits for opening mines in Ontario (simplified) .................................................................. 27
4
Sweden
1. Principles for granting exploration and mining licenses
Mineral policy/strategy
Sweden has since 2013 a mineral strategy whose vision is to "create growth throughout the country
through a long-term objective of using the country's mineral resources, in harmony with the
environment, nature and cultural values. Sweden strengthens its position as Europe's leading mining
and mineral Nation".1 Five strategic objectives identified in the strategy for the vision to be achieved:
a mining and minerals industry in harmony with the environment, cultural values and other
business activities
dialogue and cooperation to promote innovation and growth
framework and infrastructure for competitiveness and growth
an innovative mining and mineral industry with an excellent knowledge base
an internationally renowned, active and attractive mining and minerals industry.
Key legislation and permits
Exploration and exploitation of concession minerals is regulated by the Minerals Act (1991: 45). The
concession minerals referred to, are those usable industrially and of economic importance as well as
requiring extensive, systematic and often scientifically based prospecting methods. The purpose of
the Minerals Act is to define the preconditions for the exploration and extraction of concession
minerals regardless of ownership. It also means that the land owner may be forced to abandon the
land for mineral extraction against his will. The Minerals Act is commonly described as a law based
on the concessionary system with strong elements from the claim system.
Permitting authority under the Minerals Act is the Mining Inspectorate and decisions are taken by
the Chief Mining Inspector. The Chief Mining Inspector can however also refer exploitation
concession issues for primary assessment to the government, e.g. in the event of particularly large or
controversial mining projects. To get the right to explore minerals an exploration permit is required.
Before the actual exploration and survey work may begin, a work plan is drawn up. This plan must be
approved by the property owner alternatively be determined by the Chief Mining Inspector if no
agreement can be reached. To get the right to extract minerals an exploitation concession is
required. An environmental impact assessment under the Environmental Code is an essential part of
the decision basis whether or not an exploitation concession can be granted. In order to commence
mining which is classified as an environmentally hazardous activity, an environmental permit is
required under the Environmental Code. Permission is granted by the Land and Environment Court.
To access land above ground which is needed for exploitation, land must be designated. This is done
in a special land designation proceeding presided over by the Chief Mining Inspector. For the
construction of buildings in the mining area building permits are required. Moreover, a site
improvement permit is needed for excavations. These permissions are given by the local municipal
building committee.
Figure 1 Permits for opening mines in Sweden (simplified).
5
Exploration permit and Exploitation concession Land Designation
workplan •Authority: The Mining Proceeding
•Authority: The Mining Inspectorate •Authority: The Mining
Inspectorate •Legislation: The Minerals Act Inspectorate
•Legislation: The Minerals Act •Legislation: The Minerals Act
Environmental Permit Building Permit
•Authority: Land and •Authority: Municipality
Environment Court •Legislation: The Planning and
•Legislation: The Environmental Building Act
Code
Ownership
The Minerals Act does not specify anything about ownership of the concession minerals but
regulates only who under certain conditions may dispose of them. The ownership of the minerals
that are regulated in the Minerals Act is unclear. There is nothing stated that mineral resources
belong to the nation or the people. A property owner's right to dispose of the minerals, governed by
the Minerals Act can be said to be limited because someone else can get this right. Even if the state is
not seen as the true owner of the minerals covered by the Minerals Act, the state, regardless of
ownership, has a decisive influence on the exploration and exploitation of these assets.
2. Fees, royalties/taxes
The Swedish fee system intends to speed up exploration and open up areas for new applicants by
increasing fees over time. The system is composed of a fixed fee, which covers the handling costs at
the authorities giving the permits. In addition there is a fee dependent on the area used. There are
no work commitments necessary but a work program has to be lodged and adhered to. For a mining
concession there is a similar handling fee and in addition to that a mineral compensation under the
Minerals Act. The compensation shall be equivalent to two per mill of the estimated value of the
minerals covered by the concession and mined during the year. The compensation is divided by
three-quarters given to the land owner of the concession area, and one -quarter to the state. The
compensation is aimed at giving compensation to the land owners within the concession area. The
minor part to the state is earmarked for R&D and is no royalty if understood as a tax on the grant to
extract the resource. Mineral compensation is not paid to other right holders such as lessees or
reindeer herders. Costs for surveying and land designation proceedings must also be paid by the
applicant and referred to as land allocation fee.
Exploration application fee is SEK 500 per area of 2000 hectares. Exploration fee is SEK 20 per
hectare, if the application concerns metals and industrial minerals, or an exploration fee of SEK 2 per
hectare, if the application relates to oil, gas or diamond. When extending an exploration permit the
fee is progressively increased in order to minimize the area under license.
6
Concession time frames
In Sweden there are no set time frames for granting mineral exploration permits or any other
permits. However, in 2015 the average length to get an exploration permit was 82 days for new
exploration permits. The average length to get a mining concession was 31 months in 2015.
The complete process for obtaining an environmental permit normally takes approximately two to
three years. An application at the Land and Environment Court will normally be processed in
approximately 12 to 18 months, but there are cases that has taken much longer time than three
years. The application will include all necessary permits except building permits and permits related
to cultural heritage. These approximative time frames are valid if no appeals are lodged. It has
happened in the past decade that some cases have taken much longer up to 10 years in particular if
they end up to be finally settled by the Government. These long lead times are intensively discussed
and criticised as seriously impeding the start of new mines in particular in northern Sweden where
mining contributes importantly to regional economies. These problems have been additionally high-
lighted in the present transition to a fossil free energy future where increased supply of so-called
battery metals and other elements will be crucial to the possibilities to increase production of green
energy.
3. Concession tendering process for non-fuel minerals
Sweden has no tendering process but use the process of first come first serve for metals. There is a
concession system for fuel minerals. At present there are discussions to expand the concession
system also to the shale minerals of which there are huge deposits in Sweden. They have however
not been utilised commercially for the past 50 years.
4. State participation
In Sweden there is one active state-owned enterprise in mining, LKAB. LKAB operates the large-scale
iron ore mines in Kiruna and Malmberget. LKAB was private company in the beginning of 20th century
but already in 1905 the state took an option to nationalise the company with proper remuneration to
the owners. Half the company was acquired directly at the time. The option was finally exercised in
1955 when LKAB was made into a fully state-owned enterprise. The Swedish mineral legislation was
transformed in the early 1990’s. Until then the state had the right to, with full compensation, take a
50 % share in any mining project. It was also prohibited for foreign entities to hold mining rights etc.
All these legal rights and rules were cancelled and Sweden became fully open to foreign investments
in this and other areas.
7
Poland
1. Principles for granting exploration and mining licenses
Mineral policy/strategy
There is no mineral policy or strategy sensu stricto in Poland. There is an energy policy (Energy Policy
of Poland until 2030) including also the important coal industry. De facto the present policy is to a
large extent characterised by the practices introduced during the period of centrally planning of the
economy. Mining companies are mostly state owned or state controlled. Foreign interests in Poland
meet with difficulties and activities abroad by Polish companies are rare. The environmental
permitting processes is on the other hand more decentralised than in most other mining countries,
as a reaction to the previous centralised way of decision making often without proper consideration
of local voices and environmental problems. The lack of mineral policy is a hot topic and already in
early 2015 a group of scholars and experts published a discussion paper with the eloquent title:
“Polish natural resources policy – A report about something, which does not exist but is badly
needed”. According to this report “politicians must realise that raw materials management is a truly
long-term and international business”. As far as we are aware no policy has been published until the
end of 2020.
Key legislation and permits
Exploration and extraction of minerals are mainly regulated by:
Mining Act 2011, Environment Protection Act 2001, Extraction Waste Act 2008 , Act on Disclosure of
Environmental Information and its Protection, Public Participation in Environment Protection, and
the Environmental Impact Assessment 2008.
The first step in obtaining a permit to explore or mine for metallic minerals in Poland is to get a so
called usufruct, which give the right to use a mineral and also sets the fee to use the property of the
state (the mineral). A usufruct is issued by the State Treasury. With such a usufruct agreement an
appliction for a concession can be made. There are three types of concessions:
Exploration licence, this type is used for areas where the geology is not well-known (green field). The
concession gives the holder the right to explore according to a plan which has to be relatively
detailed already at the start of work.
Advanced exploration licence. This type is used for areas where the geology is better known and
where a mineralisation is already found. It is the detailed size and distribution of the deposit which is
in focus. The license permits continued exploration according to a detailed plan and possibly also test
mining of small quantities. Whether an applicant shall start with this license or with an Exploration
license is decided by the authorities.
Mining licence is a permit to mine in commercial scale.
The process to apply for mineral rights is complicated in Poland, the major steps are described in
figure 3 below.
8
Figure 2 Permits for opening mines in Poland (simplified)
Usufruct
•Authority: State Treasury
•Legislation: Mining act
Exploration licence Advanced Exploration
•Authority: Ministry of the License
Environment •Authority: Ministry of the
•Legislation: Mining act Environment
•Legislation: Mining act
Environmental permit
•Authority: Regional
Departments of Environmental
Protection
•Legislation: Environmental
protection act
Exploration plan
•Authority: Ministry of the
Environment
•Legislation: Mining act
Environmental permit Mining licence
•Authority: Regional •Authority: Ministry of the
Departments of Environmental Environment
Protection •Legislation: Mining act
•Legislation: Mining act
Ownership
Deposits of hydrocarbons, coal, methane together with coal, lignite, metal ores with the exception of
bog iron ore, metals in the native state, ores of radioactive elements, native sulfur, rock salt,
potassium salt, all other salts, potassium magnesium, gypsum and anhydrite, precious stones, and
curative thermal waters and brines are owned by the State. All other minerals are owned by the land
owner down to a depth where it is technically and economically feasible to mine.
2. Fees and royalties
9
The Polish fee system is based on an application fee and an area dependent fee. The fees increase
with time. There are severe penalties in the form of raised fees if not 50 per cent of the original
concession area is returned at the end of the period the original permit was valid for. There are no
formal work commitments demanded but the authorities monitor the work undertaken carefully
against the exploration program. If the program has not been fulfilled heavy penalties might apply.
For the exploitation phase the system is more complicated than the system in Sweden and Finland
and varies depending on mineral owned by the state or the landowner and also which are the
minerals, metals explored for or mined.
The following fees apply:
• nominal administrative fee
• annual concession fee (mining usufruct fee)
• exploitation fee (royalty) depending on the production levels
• special mining tax (additional royalty) in case of mining of copper and/or silver (see below).
The annual concession fee is composed of a fixed and a variable element.
• The fixed element is a percentage of the value of the deposit mined, based on its proven reserves
and varies depending on mineral mined from 0.0005 per cent of the deposit in situ value to 0.1
per cent. For metallic ores it is 0.005 per cent. The commodity price used for this calculation is
published annually by the Treasury.
• The variable element is dependent of the exploitation fee paid by the miner in the preceding year
and is calculated as a fraction (5-50 per cent) of such royalty paid in the preceding year. For
metal mining it is 30 per cent.
The exploitation fee is effectively a royalty. In Poland royalty rates are stated in the Mining Law and
are based on the value of the ores produced. If a mine is classified as a gold or copper mine etc. is
decided by the Ministry and hence also what is a by-product. By-products are taxed at 50 per cent of
the full fee.
The special mining tax, officially known as “Tax on Certain Commodities”, was introduced in March
2012 and originally covered copper and silver mining. In 2014 it was also extended to oil and gas
production. This tax is not based on profits of the company but purely on the value of the commodity
mined (regardless whether it was sold or not – the tax liability arises once metal concentrate has
been produced). As such it could be considered as a royalty rather than tax. The tax rate is
progressive and the progression is exponential. There are two formulas depending on the level of the
copper price. At present the only company in Poland paying this tax is state controlled copper giant
KGHM Polish Copper as nobody else produces copper or silver in Poland. There is a similar formula
for silver producers, at present also only KGHM Polish Copper. Exploration companies naturally do
not pay this tax as nothing is produced, but the tax has to be taken into account in any scoping or
feasibility study for future projects. For further details see the original report.
Concession time frames
In Poland there are certain legal timeframes for authorities to make decisions. It is stated that “a
license should be granted without unnecessary delay”. The time periods for decision by
environmental authorities with respect to the environmental permit are fixed. The law determines a
legal timeframe for deciding on the approval or dismissal of building-, water-, waste-, and mining
waste permission within 60 days. All such permissions can be granted in parallel.
10
For land-owner minerals (not metallic minerals) the average length to get an exploration licence is
estimated of 4 months. For very small deposits, less than 2 ha, mining permission is obtained
generally within 3 months. For large deposits it may take up to three to five years.
3. Concession tendering process for non-fuel minerals
Poland has no tendering process but the first come first served principle is applied.
4. State participation
KGHM Polska Miedz SA is the leading Polish copper and precious metals producer. In world terms, it
ranks among the top-ten copper producers. KGHM was created in 1991 as a state-owned joint stock
company to continue the operations of the former Kombinat Górniczo-Hutniczy Miedzi, which had
been producing ore from copper deposits located in southwestern Poland since 1961. The company
was part-privatised in 1997 and was listed on the London and Warsaw stock exchanges, with the
state retaining a 44.3% share. In early 2010, the Polish government sold part of its holding in the
company, reducing its stake from 41.8% to 31.8%. The political influences over Polish Copper are still
very strong.
11
Finland
1. Principles for granting exploration and mining licenses
Mineral policy/strategy
Finland has since 2010, a mineral strategy whose long-term goal is "a viable mineral area of global
competitiveness, which ensures the Finnish raw materials, increases the vitality of regions and
promotes the responsible use of natural resources". The objectives of the mineral strategy is to
promote growth and prosperity in Finland, tackling global challenges in the mineral supply chain and
reduce environmental damage. According to the vision of the mineral strategy, Finland, in 2050, is a
global pioneer in the sustainable exploitation of minerals and the mineral sector is one of the
mainstays of the economy. The mineral strategy is part of the development of the natural resource
strategy for Finland.
Key legislation and permits
Exploration and extraction of so-called mining minerals is governed by the Mining Act (621/2011).
The purpose of the act is according to the opening paragraph to promote mining and ensure that the
use of the areas needed for the operation and mineral exploration is arranged in a socially,
economically and ecologically sustainable way. The Mining Act shall, on the one hand, ensure the
conditions for ore exploration and mining and on the other hand, ensure environmental aspects, civil
rights and freedoms, landowner rights and municipalities' ability to influence. The Mining Act applies
to such mining minerals and rocks that are rare and occur randomly, and therefore requires
professional exploration and significant financial risk-taking. The Mining Act, like the older legislation,
is based on the claim system which means that regardless of who owns the property it is the one
who finds a discovery that has preferential rights to extract it. The property owner can not prohibit
the deposit to be mined.
Licensing authorities pursuant to the Mining Act, is the Mining Authority and for some cases the
Government. The Finnish Safety and Chemicals Agency (Tukes) is the mining authority. Moreover
certain matters which are to be decided by the Government, is prepared by the Ministry of
Employment and the Economy. To explore and initially develop a mine an exploration permit is
required. Minor activities so called prospecting can be carried out without the permission of the
property owner which includes geological measurements, observations as well as smaller sampling.
The samples must however be notified in advance. To establish a mine and undertake mining
activities a mining permit is required. The Government may grant the right to the mining area using
an area that belongs to someone else, which is called redemption permit for a mining area. This
decision forms the basis for the land survey office to issue an order for proceedings establishing a
mining area. Construction of the mine also requires a mining safety permit given by the mining
authority. Mining is subject to authorization under the Environmental Protection Act and requires an
environmental permit granted by the Regional State Administrative Agencies.
Figure 3 Permits for opening mines in Finland (simplified)
12
Exploration permit Mining permit Redemption permit
•Authority: TUKES •Authority: TUKES •Authority: The Government
•Legislation: The Mining Act •Legislation: The Mining Act •Legislation: The Mining Act
Proceedings for Environmental permit Building permit
establishing a mining •Authority: Regional State •Authority: Municipal building
area Administrative Agencies supervisory authority
•Authority: Land survey office •Legislation: the Environmental •Legislation: the Land Use and
Protection Act Building Act
•Legislation: The Mining Act
Ownership
The property owner in principle is entitled to the mining minerals found in the ground and governed
by the Mining Act. It does not mean that landowners have discretion regarding the right to extract
minerals. Anyone who finds a deposit has preferential rights to extract it. The state has not declared
that minerals belong to the state. For minerals that are not mining minerals and therefore not
included in the Mining Act, the property owner has the right to decide how the deposits will be
utilized although permission may be needed under the Land Extraction Act to extract them.
2. Fees, royalties/taxes
The fee system in Finland is in its intentions and structure similar to the Swedish system. This applies
both to the exploration and the mining phases even though the amounts to pay differ considerably.
There is however one important difference: In Finland the Mining Act, requires the holder of the
exploration permit also to pay all land owners within the exploration area an annual compensation,
the exploration fee. For both an exploration and a mining permit, there is a basic fee and in addition
a surcharge of 95 EUR/hour if the handling of the application takes longer time than normal. The land
owners within the mining area are paid an annual compensation, excavation fee. This fee is
composed of an area dependent part and a part equal to 0.15 per cent of the estimated value of the
mined production. Costs for the proceedings for establishing a mining area (surveys etc.) must also
be paid by the applicant. In contrast to Sweden the state of Finland still carries out its own
exploration programs. Potential deposits found in connection with basic geological research are sold
in state auctions and may include royalties within the purchase agreements. There are no statutory
royalties in Finland.
An exploration permit may be extended for a maximum of three years at a time, in total, the permit
may remain valid for a maximum of 15 years.
The annual amount of the exploration fee per property shall be:
20 euros per hectare for each of the first four years of validity of the exploration permit;
30 euros per hectare per year for the fifth, sixth, and seventh year of the exploration permit;
40 euros per hectare per year for the eighth, ninth, and tenth year of the exploration permit;
13
50 euros per hectare for the eleventh and for further years of validity of the exploration permit.
The prerequisites for extension of the validity of an exploration permit are that:
exploration has been effective and systematic;
further research is necessary in order to establish the possibilities for exploiting the deposit;
the permit holder has complied with the obligations laid down in the Mining Act as well as
the permit regulations;
extension to the validity will not cause an undue burden to public or private interests.
Concession time frames
In Finland, Tukes and other authorities have no set time frames for granting exploration permits or
mining concessions. Statutory time frames are included in the Nature Conservation Act and the
Environmental Protection Act. A decision on Natura 2000 assessments must be made within 6
months. In Finland the average legal timeframe for granting an exploration licence is 120 days. In
Natura 2000 areas it is one year - as long as no appeals are made.
3. Concession tendering process for non-fuel minerals
The Geological Survey of Finland (GTK) collects and disseminates geological information. GTK is an
expert organisation accountable to the Ministry of Employment and the Economy. GTK promotes
mineral exploration and mining in Finland. GTK (the Finnish state) also carries out prospecting and
exploration work. GTK identifies and documents areas with mineral potential, in order to encourage
follow-up exploration and exploitation potential by the private sector. Prospecting results are
reported regularly, and possible new mineral indications with commercial potential are offered to
the private sector through an open tendering process arranged by the Ministry of Employment.
Except for these tenders for prospective exploration areas there are no tender processes in the
Finnish mining legislation.
4. State participation
Finland has a long tradition of major state shareholdings in mining and smelting industries. The
major, also in an international comparison, Outokumpu exploration and mining company was initially
fully state owned. The reason for this was initially a lack of capital in Finland in the early 20th century.
A gradual privatisation process was started in the 1990s and in early 2000s it was decided that
Outokumpu should withdraw from mining and exploration and focus on stainless steel.
The Talvivaara nickel/zinc mine in Sotkamo in eastern Finland, was owned by Talvivaara Mining
Company. The mine started production in 2008 as an open-pit operation. In 2014 Talvivaara Mining
Company filed for bankruptcy in a time with low nickel prices. The state-owned company Finnish
Minerals Group funded the Terrafame Oy which took over the operation and now operates the mine
under the name of Terrafame. Today Finnish Minerals Group owns 67% of Terrafame Oy with
Trafigura being a minority shareholder.
14
Finland has set targets to be in the forefront of the EV-battery industry and the state has become a
major driver for this by the investment arm of Finnish Minerals Group and the acquisition of the
Talvivaara/Terrafame mine. Terrafame is building a battery chemicals plant to further process its
nickel and cobalt sulphide products. The mission of Finnish Minerals Group is to responsibly
maximise the value of Finnish minerals and aim at creating an integrated electric vehicle battery
value chain in Finland. The value of Finnish Minerals Groups shareholdings are in 2020/21 at 486
million Euros. The state-owned group also owns a 26.3% stake in the lithium exploration company
Keliber, which aims to produce high-purity lithium hydroxide, especially for the needs of the lithium
battery market. At the end of 2020 Finnish Minerals Group signed a deal with Yara Suomi Oy for the
rights to Sokli phosphorus and iron mining project located in Northern Finland, and created the
company Sokli Oy, fully owned by Finnish Minerals Group. The strategy of Finnish Minerals Group is
based on co-investing, with the aim of attracting investments in the production of battery materials
and cells, and for recycling solutions.
15
Hungary
1. Principles for granting exploration and mining licenses
Mineral policy/strategy
To be completed
Key legislation and permits
Exploration and extraction of minerals is mainly governed by the Mining Act (XLVIII/1993) as
amended and applicable Government Regulations (HU-L6; HU-L7). There are a number of other laws
regulating details of the processes to obtain exploration and exploitation permits and on the
environmental permits and studies necessary. Hungarian legislation is frequently amended in
response to outcomes of court cases.
Areas "open" and "closed" for exploration are key concepts in the Hungarian mining legislation. In an
"open area" exploration permits are granted by the regional "Government Office" but in a "closed
area" permits, in the form of a concession following a tendering process, are only given by the
central authority the Hungarian Office for Geology and Mining (MBFH)/Hungarian Geological Survey
(MBFZ). In 2010 all of Hungary was declared as a closed area for exploration and mining of metallic
minerals, fuel-minerals and using of geothermal energy.
Since 2015 the MBFH is hence, in effect, the responsible central authority acting as a one-stop-shop
agency responsible for administrating the Mining Act and all permitting procedures for metallic
minerals. For other minerals (aggregates and industrial minerals) decision making is decentralised to
the 20 (19 counties and Budapest) regional so-called Government Offices. They are responsible for
permitting of all exploration and exploitation applications for these raw materials. These offices are
responsible for mining, environment, cultural heritage and all other legislation relevant to an
application for an exploration permit.
If a decision from one of the regional Government Offices is appealed the MBFH and other relevant
central authorities such as the National Inspectorate for Environment, Nature and Water step in and
are included in the process. The right to appeal a decision made by a regional Government Office is
granted to a wide group of persons and entities not only the directly involved. Appeals of the
decision made by the regional Government Offices are very common. In a third step the decision
made by the MBFH can be appealed in the judicial system's three levels.
The procedure for obtaining a permit to explore for and exploit deposits in "open areas" i.e.
aggregates and industrial minerals is at least in theory relatively simple and straight forward and
could start within 2-3 months. The permitting process has two steps: an initial exploration permit
which requires a minimum of data such as the area where work is planned. The second step is to
submit a Technical Operation Plan, a work plan, when this plan is approved exploration work can
start. A similar two staged process is used also when applying for an exploitation permit.
The final exploration permit is given for four years with a possibility to extend for maximum 2+2
years.
16
The process to obtain an exploration permit and exploitation permit for metallic minerals are
described below.
Ownership
All mineral resources in Hungary belong to the state.
2. Fees, royalties/taxes
To hold the right of a concession a certain fee must be paid, or an alternative compensation must be
provided to the state. In the concession tendering process, the minister shall set the minimal amount
of concession fee, but the applicant may offer a higher amount. The following figures give the "usual"
rates. The fee for exploration permit is: 100 €; exploration approval: 170 €; exploration final report
approval: 170 €; drilling permit: 450 €. A mining plot permit: 400 € (300 € for open pit); extraction
approval: 300 € (170 € for open pit); remediation plan approval: 140 €; mine waste management
plan approval: 120 €; mine waste management facility permit: 200 €; other mine facilities (incl.
processing plant) construction permits: 100 - 400 €.
In exchange for exploiting any mineral resource upon a concession contract, the Hungarian State
shall be entitled to mining royalty. The lowest rate of the mining royalty payable on the basis of the
concession contract shall be fixed individually in accordance with the decision of the responsible
minister for each tendered area. The minister shall publish the lowest rate of the mining royalty both
in the Call for Tender and the tender announcement. The tenderer may overbid the royalty rate set
by the minister in the tender. A royalty of 2 % applies for mineral ores for non-ferrous metallic minerals
from underground extraction and 5 % for non-ferrous metallic minerals from open-pits. Values often used
are provided by the Government Regulation (HU-L8): aggregates: 3-40 €/m3, industrial minerals: 4-130 €/m3,
metallic ores: 150- 200 €/m3.
Concession time frames
If the entire process runs smoothly and according to all rules, applicants for aggregates and industrial
minerals in open areas may start exploration within 2-3 months, and extraction within 1-1.5 years.
For ore minerals in closed areas subjected to a tendering process another 1.5-2 years is needed for
the concession procedure.
3. Concession tendering process for non-fuel minerals
The concession tendering process is much more complicated than the application process for "open
areas" and very few if any concessions have been granted for metallic minerals in the past decades.
The process can be initiated either by government or by an applicant (company or private person).
The first step is to prepare a so-called Complex Environmental Vulnerability Study (CVS), which gives
an overview of environmental, land use, health and safety and other impacts in a process including a
range of government agencies and also public input before being finalised. This study is done by the
MBFH. When the CVS is completed, tender documents are prepared by the relevant authorities and a
17
call for tenders is published. The tender process itself is regulated in detail. When the negotiations of
the tender contract are finalised a similar process as described above for "open areas" starts for the
concessionaire to obtain all necessary permits for exploration and later exploitation. The concession
is given for 35 years and can be extended for another 17.5 years.
For metallic ores exploration permits are subjected to a tendering process. The closed areas of the
country are reviewed every five year in respect of potential mineral resources and qualify them as
closed. The Minister of Innovation and Technology is responsible for mining affairs. In closed areas, it
is the minister who grant the right for exploration of mineral resources in the concession contract.
Concession tenders are prepared by MBFH/MBFSZ.
Figure 4 Permits for opening mines in Hungary (simplified).
The submission of a tender proposal shall only be possible after purchasing the tender
documentation and depositing a bid bond. In evaluating the tenders, the minister shall set up a
committee. The Committee shall review the tender applications and suggests the winner of the
tender for the minister. The minister will grant the concession based on the suggestion of the
Committee.
4. State participation
There are no demands nor legal provisions for state participation in mining projects.
The Hungarian bauxite mines owned by the state aluminium company were privatised in 1995. In
2013 the mines were nationalised again after the private company went bankrupt. Bauxite mining
operations were gradually closed down and all bauxite mining was stopped in 2018.
18
Portugal
1. Principles for granting exploration and mining licenses
Mineral policy/strategy
The Portuguese National Strategy for Geological Resources – Mineral Resources was launched in
2012. The strategy aims to promote a mining sector which is:
Dynamic, ensuring continuing investments and proper exploitation of the resources
Sustainable at economic, social, environmental and territorial levels
Capable to promote the growth of the national economy, by ensuring supply of essential raw
materials and reinforces its contribution to the national Gross Domestic Product and exports
growth.
Capable to promote regional development, ensuring the economic revenues and
employment for local people and development of local communities.
Key legislation and permits
The main regulatory framework for exploration and exploitation of mineral resources are:
Constitution of 1976.
Law no 54/2015
Minerals Law decree law no 88/90 which sets out the regulations of mineral deposits.
These laws apply to metallic minerals of "high economic interests". Aggregates and some industrial
minerals are called "mineral masses" and follow other legislations as is also the case for fuel
minerals.
The Directorate General of Energy and Geology (DGEG) is the responsible authority for issuing
permits for exploration and extraction of mineral deposits. DGEG is organised under the Ministry of
Economy. DGEG is a so called “one stop shop”. However, for the mining phase specific competencies
governed by other authorities regarding for example health and safety, nature conservation and
cultural heritage may also apply. DGEG is also the controlling instance and monitor the exercise of
the operations covered by the contracts. The municipal authorities of the area covered by the
application are involved in the environment and spatial planning. Local authorities’ comments will be
taken into account, but the Minister of Economy (DGEG) is the sole granter of mineral licenses.
The Portuguese Environmental Agency (APA) issues environmental permits for exploitation contracts.
No specific environmental permit is necessary for exploration.
The exploration contract contains details of work commitments including investment amounts, time
frames and possible annual fees. The contract is usually valid for no more than five years including an
initial 1-2 years followed by maximum three extensions of one year each. At each extension the
licensee shall reduce the area of exploration by a minimum of 50 %.To continue operations the
licensee must submit progress reports twice every year.
19
If there are more than one company applying to explore the same area, the DGEG can decide to
open a public tender. This procedure is however very unusual, even though the mining law includes
this possibility.
A successfully concluded exploration contract will automatically give the licensee the possibility to
apply for an exploitation contract. There is also the possibility of a public tender If understood as
strategic for the national economy, a mineral deposit can be made available through competitive
bidding, for which it will be published in national and local newspapers where deadlines for
proposals are set. Please see below.
An application for an exploitation contract is also handled by the DGEG. The application should
contain an environmental impact assessment which will be scrutinised by the APA and the
internationally usual plans such as mine plan, health and safety plan, a landscape recovery plan,
waste management plan and an economic pre-feasibility study.
For operations with an extraction rate of 200,000 tonnes or more or larger than 15 hectares an EIA
and a protection plan must be submitted to be approved by the Environment Ministry as a condition
for the award of the contract. The extraction application will be advertised through a public
consultation but the decision, If the environmental impact study is approved by the APA the DGEG
alone makes the final decision.
To be completed
Figure 5. Permits for operating mines in Portugal (simplified)
Ownership
All metallic and minerals and industrial minerals are owned by the state. Construction minerals
including limestone belongs to the landowner.
2. Fees, royalties/taxes
There are no fees levied on exploration and exploitation contracts. In some cases the contracts may
include payment of annual or otherwise fees. However, an applicant will have to cover the following
costs:
Publication of the DGEG's decision in the official journal
A provisional bond to ensure that the applicant will execute the concession as agreed
All costs associated with the execution of the concession contract.
Royalties and other financial compensation are negotiated on a case-by case basis and included in
the concession contract. The rates usually vary between 2-5 % of the value of production at the mine
gate.
20
Concession time frames
There are no fixed legal timeframes for the authorities to make any decisions or answer questions. In
practice, exploration permits and mining concessions are granted on average in 7 and 11 months
respectively, if no appeals are made. The main reason for these low timeframes is the “one-stop-
shop” system. The last 30 years Portugal has only had minor court cases, and only at local courts,
challenging decisions made by the DGEG.
To receive an extraction permit takes about 5 months after the approval of an environment impact
study. This study is evaluated by a steering committee coordinated by the environment authority
during 4-6 months. On average, it takes any project eleven months to get necessary permits.
3. Concession tendering process for non-fuel minerals
If a mineral deposit is defined as strategic for the national economy there can be a public tender.
Recently there has been a strong interest from Government in the lithium industry. Portugal is the
top producer of lithium in Europe and the lithium resources are considered to be of national interest
and Portugal has prepared for a tender process. In 2018 the government approved a resolution
known as the “Lithium strategy” envisaged to boost Portugal's lithium industry, but not only in
mining but also in processing lithium. However, the tender process has been delayed for several
years because of uncertainty of a new law clarifying “new environmental requirements”. There have
been no news regarding the lithium tender process since January 2020.
4. State participation
There are no demands nor legal provisions for state participation in mining projects.
21
Queensland (Australia)
1. Principles for granting exploration and mining licenses
Mineral policy/strategy
According to the national strategy for exploration, which applies to Australia as a whole, the vision is
to see the potential of the deposits that have not been investigated effectively because of protective
layers of sand and sediment. Creating trusting relationships with the community and stakeholders in
the regulation of the sector is also a priority as well as building a culture that can manage risks in
different ways.
To be completed with strategy for Queensland.
Key legislation and permits
Exploration and extraction of minerals is regulated in the Mineral Resources Act 1989. The various
states in Australia have their own laws on mineral that is found on land. A mining project may still be
subject to federal legislation in areas such as trade, fiscal, indigenous people and environmental
protection. Mining Act applies to minerals owned by the Crown (State of Queensland) which is the
most common situation. If the minerals are privately owned, the law does not apply. Mineral rights
are granted by the state on the basis of a claim system ("first come first served"). The law has a broad
definition of minerals, including all natural substances. There are a number of substances defined as
minerals only when they are on land owned by the Crown. If sand, gravel, limestone or shale are
located on private land the rules of the local authorities instead apply. Besides the Mining Act, State
Agreements are used to regulate large-scale, capital-intensive mining projects. These contracts may,
in addition to granting rights to the deposit, include provisions on the development of infrastructure,
housing and finance.
The Department of Resources is the responsible department/ authority for the granting of mineral
rights (mining tenements or mineral titles) under the Mineral Resources Act. The Mineral Resources
Act is administered by the Minister. Before any exploration activity or resource production can take
place in Queensland, the appropriate resource authority needs to be obtained. Either there is a direct
application, which is the case for most metals and minerals, or through a competitive tendering
process in some cases. Competitive tendering applies to petroleum and gas, coal and, where
appropriate, mineral exploration. When applying for any resource permit, applicants need to apply
for an environmental authority to be covered for the activities that will be carried out. Depending on
the resource project's level of environmental risk, the project needs an environmental authority, a
variation application, or a site-specific application. The Department of Environment and Science
(DES) grants environmental authorities for mining and exploration under the Environmental
Protection Act 1994.
22
Enivrionmental authority Prospecting/exploration- Mining proposal
license
•Authority: Department of •Authority: Department of
Environment and Science. • Authority: Department of Resources
Resources.
•Legislation: Environmental •Legislation: Mineral Resources
• Legislation: Mineral Resources Act
Protection Act Act
Mining lease Building license
•Authority: Department of •Authority: Local Authority
Resources •Legislation: Building and
•Legislation: Mineral and Construction Commission Act
Energy Resources (Common
Provisions) Act
Figure 6. Permits for operating mines in Queensland (simplified)
2. Fees, royalties/taxes
Depending on the mineral, the royalty rate payable under the Mineral Resources Regulation 2013 is
either a percentage of the value of the mineral or a flat rate per tonne. The value of a mineral (other
than coal seam gas) is calculated by determining the gross value of the mineral and deducting certain
permitted expenses. Royalty rate for base- and precious metals, which includes cobalt, copper, gold,
lead, nickel, silver and zinc, varies between 2.50% and 5.00% (varying in 0.02% increments) of value,
depending on average metal prices. The rate for each period for calculating the royalty is published in
an official gazette. Processing discount applies (except gold and silver), royalty-free threshold applies
as follows:
(1) No royalty is payable on the first AUD 100,000 of the total value of a relevant mineral, mined
under a mining operation, that is sold, disposed of or used in a financial year.
(2) If more than 1 relevant mineral mined under a mining operation is sold, disposed of or used in a
financial year—
(a) the person by whom the royalty is payable under the Act for the minerals must nominate
one of the minerals (the nominated mineral); and
(b) no royalty is payable on the first AUD 100,000 of the total value of the nominated mineral
that is sold, disposed of or used in the financial year.
(3) However, if less than AUD 100,000 of value of the nominated mineral is sold, disposed of or used
in the financial year, the person may repeat the process under subsection (2) until the combined
value of the relevant minerals nominated by the person and sold, disposed of or used in the financial
year reaches AUD100,000.
23
A mineral development licence (MDL) is issued so that a company can evaluate the development
potential of the defined resource. An MDL can be granted if the company hold an exploration permit
where there is a significant mineral occurrence of possible economic potential.
The MDL allows companies to conduct geoscientific programs (e.g. drilling, seismic surveys), mining
feasibility studies, metallurgical testing and marketing, and environmental, engineering and design
studies. A mining lease allows you to machine-mine for specified minerals and conduct other
activities associated with mining or promoting the activity of mining. Mining leases cannot be
granted or renewed unless compensation for landholders has been settled, either through a
compensation agreement or Land Court determination. A mining lease application may be refused if
it doesn’t have an agreement or haven not applied to the Land Court within 3 months of:
the day the Governor in Council consented to your application
or
the last objection day for the application (if no one objected to your application)
or
the day the Land Court issued a recommendation about the grant of the mining lease.
Concession time frames
The Department of Resources has detailed data on how long time different applications take. In 2020
the median application duration for new exploration permit applications was 9 months. 75% of the
exploration permits were handled within 12.8 months. For renewal of exploration permits the
median was 2.3 months and 75% were handled within 3.5 months. For a mining lease in 2020, the
median application duration was 28.7 months while renewal was 11.5 months. The Department of
Resources aims to complete 80% of targets within the timeframe. There are certain targets for
different steps in the permitting for exploration applications and mining leases. The targets for
exploration mining applications are: Initial assessment 2 business days, Technical assessment 40
business days, decision summary 30 business days. For production mining leases the targets are:
Initial assessment 2 business days, Technical assessment 5 months, decision summary 3 months.
The time taken for each individual application may be influenced by tasks outside the control of the
department, such as native title and environmental assessments, hence the discrepancy between the
targets of the Department and the actual time for approving applications.
3. Concession tendering process for non-fuel minerals
A tendering process applies to petroleum and gas, coal and, where appropriate, mineral exploration.
In general, there are no tendering process for minerals in Queensland. For example, the most recent
tender was on a greenhouse gas storage exploration.
Competitive tendering ensures Queensland's resources are responsibly managed by allocating
exploration rights to companies that have the greatest exploration and development capacity for
these resources. It also provides a fair and transparent process for awarding a preferred tenderer.
The tendering process comprises two stages- the tender itself, where applicants tender for the right
to be an applicant for a tenure, and the actual application process. It takes in average 3.6 months for
to be awarded successful tendering status, after that the applicant proceeds to stage two, the
24
application. To commence a call for tenders the Minister will publish a gazette notice (a call for
mining lease tenders) inviting tenders for an eligible person to apply for a mining lease.
A rigorous process is in place to assess tender applications and select a preferred tenderer. The
process and criteria are outlined in each call for tender document and typically include consideration
of the applicants’ financial and technical capabilities and their strategy for engaging with the
community. Preferred tenderers will need to meet environmental and other approval requirements
(e.g. land access and compensation) before the resource authority is granted.
The selection of tender areas is based on a range of factors including:
environmental, regional and state planning interests (e.g., constraints such as priority living
areas and national parks)
the area's potential for GHG storage
commercial and market considerations
competing land uses
current geological knowledge.
4. State participation
There are no demands nor legal provisions for state participation in mining projects in Queensland.
25
Ontario (Canada)
1. Principles for granting exploration and mining licenses
Mineral policy/strategy
Ontario has since 2015 a mineral strategy that replaces the first strategy from 2006. The vision for
the province's mineral sector is to become a global leader. Four strategic priorities for the industry
are highlighted in the strategy. The industry should be kept competitive and innovative, safety and
environmentally responsible, efficiently and effectively regulated, growing and prosperous by
enhancing aboriginal voices and meaningful participation, and building a highly-skilled workforce.
Key legislation and permits
Exploration and extraction of minerals is regulated in the Mining Act. The vision behind the first
mineral strategy led, inter alia, to a modernisation of the Mining Act in 2009. The various provinces in
Canada have their own laws on mineral that is found on land. A mining project may still however be
subjected to federal legislation regarding trade, indigenous people, environmental protection and
the impact on fisheries and navigable waters. The Mining Act applies to minerals owned by the
Crown. Minerals under the Act is defined as any naturally occurring minerals (metals and non-metals)
including gas, petroleum, coal, salt, quarry, gold, silver and precious metals but does not include
sand, gravel and peat. Sand and gravel are regulated in the Aggregate Resources Act. For some
minerals such as limestone and marble provisions are in both the Mining Act and the Aggregate
Resources Act. The purpose of the Mining Act is to encourage prospecting, staking and exploration
for the development of mineral resources that is consistent with the aboriginal rights, including a
duty to consult, and to minimize the impact of these activities on public health, safety and the
environment. Mineral rights are granted through a claim system.
Indigenous rights are protected under the Constitution. Many Aboriginals in Ontario (First Nations
and Métis) have aboriginal rights or treaty rights. Contacts with these groups should be maintained
throughout the process of opening a mine. To support that the aboriginal rights are recognized
during exploration and mineral extraction, a number of guidelines (policies) has been developed
within the ministry responsible for mining.
The first step to get exclusive rights to explore is to claim an area. However, to gain access to land
that is open for claiming a prospector's license is required. This right is not exclusive but is a
prerequisite for claiming land. The most common way of claiming land is that the selection is done in
the field (claim staking). Detail rules on staking applies and marking should be done in a square or
rectangular shape. Besides claims there is also a permit called exploratory license of occupation (ELO)
which allows the exploration of land and water areas more desolate located and where the minister
can impose various conditions adapted to each case.
To get a right to extract the minerals it is required that a mining claim is transferred to a lease (land
acquisition). The right to transform a claim to a lease is predetermined according to the Mining Act
provided the legal requirements are followed. A mining lease is granted by the Ministry of Natural
Resources. A lease can be issued for mining rights and surface rights or mining rights only alternative
surface rights only. Unless the Crown holds the surface rights, such rights cannot be obtained other
than that agreed with the owner. All deposits and minerals taken from the soil obtained according to
the Mining Act must be treated and refined in Canada unless an exception is made. A lease is
transferable after permission.
26
In order to perform certain exploration activities on both claims and leases an exploration plan must
be submitted to the Ministry of Northern Development and Mines (MNDM) before work can begin.
The plan is used to inform aboriginal communities, government, land owners and other rights
holders. Depending on the activities to be carried out an exploration permit can also be required. The
system of exploration plans and exploration permits are used early in the exploration phase for
activities that cause minimal to low impact on the environment. Prior to a more advanced
exploration work, a closure plan must be submitted to the MNDM. A financial assurance is part of the
plan and must also be handed in to ensure that the restoration work will be carried out.
The number of mining projects that involves an environmental assessment process (EA) and the
extent of these vary by the type of permit required and size of the project. Sometimes a project is
also required to be examined under federal law. Several environmental permits may also be
required. If surface water or groundwater are affected a permit to take water is required. Emissions
into the air require an environmental compliance approval. For the construction of buildings a
building permit is required from the municipality. For structures and buildings located on Crown land
a work permit is needed which is given by the Ministry of Natural Resources. Work permits are also
required when roads are constructed on Crown land and when water crossings are affected.
In order to streamline the permit process there are mineral development officers within MNDM
whose role under the Mining Act is to coordinate and facilitate communication with the industry, the
public and government departments and agencies.
Figure 7 Permits for opening mines in Ontario (simplified)
Claim Exploration permit Lease
•Authority: Ministry of •Authority: Ministry of •Authority: Ministry of Natural
Northern Development and Northern Development and Rresources
Mines Mines •Legislation: Mining Act
•Legislation: Mining Act •Legislation: Mining Act
Closure plan Environmental Compliance Building permit
approval
•Authority: Ministry of •Authority: Local municipality
•Authority: Ministry of
Northern Development and •Legislation: Planning Act
Environment
Mines
•Legislation: Environmental
•Legislation: Mining Act
Protection Act
Ownership
Since the Crown controls most of the land areas, ownership of minerals are also often linked to the
state or Crown. Since the early 1900s, the Crown also reserved the mineral rights in most new land
concessions or grants but historically there have been different approaches. If the Crown has not
reserved the mineral rights on the land granting the minerals are privately owned. A distinction is
made between the mineral rights and the surface rights. Mineral rights are defined as rights to
minerals located in, on and under a piece of land.
27
2. Fees, royalties/taxes
In Ontario the fee to register a claim varies depending on the number of units, 1 unit (16 ha), applied
for. In addition there is a requirement for annual work to be performed. If no work is performed the
claim might be lost. The application fee for a lease is 75 CAD and the annual lease (rent) is 3 CAD per
hectare. Since 1907 a tax on land (mineral rights) used for exploration and mining (mining land tax) is
levied. The tax is 4 CAD per hectare per year.
Royalties are payable for diamonds on a portion (percentage) of the net value of the output
according to the Mining Act. Large areas are held in public ownership. The Crown can here be seen as
a landowner in addition to an owner of the minerals with demands on payment for land (rent) and
minerals (royalty or tax). For further details see the original report.
3. Concession tendering process for non-fuel minerals
Ontario has no tendering process but use the process of first come first serve.
4. State participation
In Ontario there are no state participation in mining.
28
Proposal for Ministry of Economic Affairs and Communications, Estonia
Comparative analysis of the mining legislation in certain countries
Prepared by RMG Consulting, Stockholm Sweden
Competence and expertise
RMG Consultants are mineral economists and policy analysts that have been working globally since
more than 40 years advising governments, international organisations, mining companies, suppliers
to the mining industry and NGOs. Please visit our website for additional details
(www.rmgconsulting.org). Magnus Ericsson is the co-founder of RMG Consultants and its
predecessor Raw Materials Group.
Project team
Magnus Ericsson will do most of the work personally but will be supported by our senior researcher
Olof Löf in collecting all relevant information. On request we will supply CVs for him.
Methodology
General
We will follow the tender document in all details. The study concerns non-fuel minerals only.
A close cooperation with the Ministry from the very start will be crucial to reach the goals for the
study. A designated contact person from the Ministry and regular project meetings will be necessary
to finalise the study on time and with the relevant results.
Selection of countries
The selection of countries to study is key to the results of the analysis. Our suggestion for countries
to study, with motivations, is as follows:
Europe
Sweden and Poland are the two leading mining countries of Europe. There is however one important
difference between the two: Sweden has an important exploration sector while in Poland exploration
is limited.
Finland is a third important mining country and is growing with several new mines taken into
operation in the past decades.
Portugal is a country with a well-established mining sector, albeit smaller than the three mentioned
above. Portugal is included as it has a tendering possibility in its mining legislation.
Hungary, is a producer of lignite but all other metal mining has practically stopped. Hungary has
however a tendering process possibility in its mineral legislation and will in that way supplement
Portugal and the other countries proposed.
Outside Europe
Queensland (Australia) is one of the leading Australian mining states with a thriving mining industry.
Ontario (Canada) another internationally leading exploration and mining province.
In both Australia and Canada mining legislation is handled on a state (province) level. The leadership
of both countries as far as a successful mining industry is concerned is undisputed and their inclusion
in the analysis goes without saying.
India has recently introduced the tendering process into its mineral legislation, we will not fully cover
the Indian mining legislation, but specifically report from the experiences made during the process.
For the part of the analysis concerning state participation there are no examples, as far as we know
from European countries. Sweden had such provisions but in the new 1992 legislation they were
removed from the mining law. A range of African countries has the possibility to acquire a minority
2
interest either as a free carried interest or in combination with buying additional shares at arms
lengths prices. For example Kenya, Cameron, Botswana, Angola, Tanzania and others. We suggest
that the selection of exactly which countries to include in this part of the study should be made after
discussions with the Ministry.
Data collection
Our study will mostly be desk-top work with collection of data from government web-sites and other
relevant sources. We will also use our wide network of contacts in most of the selected countries to
supplement and confirm details that might not be completely clear or to answer additional
questions.
Analysis
The study will be a traditional comparative legal analysis. The selected specific aspects to study are:
Principles for granting licenses including relation between mineral rights and land ownership.
Time frames, fees, royalties (royalty base) and other relevant aspects to jointly agreed.
Tendering process, if applicable, with relevant details: qualification conditions and process,
principles and criteria for evaluation of tenders, licenses given (exploration concession and
mining concession separately and the two linked together).
State participation whether carried free interest or a right to participate with compensation
with relevant details.
Environmental legislation and taxes other than royalties will not be included in the analysis.
The results will be presented in text describing the situation in each country and also in summarising
matrixes with all countries included. References to web based and other sources will be given.
The final section will be giving proposals for a suitable legislation for Estonia and how this could be
developed. In this part we will particularly benefit from our long experience in this legal area. Our
long-standing cooperation with the Centre for Energy, Petroleum and Mineral Law and Policy
(CEPMLP) at the University of Dundee (Scotland) has given us a detailed understanding of on-going
academic research in this area. Projects undertaken together with the World Bank, the UN Economic
Commission for Africa and a range of national governments and international organisations have
given us practical experiences of drafting policies and legislation. Not least important is the way
forward to a new mineral policy. Involving all stakeholders from an early stage in consultations and
making sure that the policy when it is published has been accepted by all stakeholders including civil
society and potential foreign investors.
Time schedule
Project start Mid March 2021
Data collection completed Mid April 2021
Report first draft Early May 2021
Final report End May 2021
Price
15 000 EUR. This includes no travel and no taxes but we do not expect to travel nor to have to pay
any taxes.
We suggest payment of 1/3 upon signing of the contract and 2/3 after acceptance of the final report.
Stockholm March 2nd 2021
RMG Consulting/Magnus Ericsson
Comparative analysis of the
mining legislation
in certain countries
Suggestions for Estonia
A study for the
Ministry of Economic Affairs and Communications, Estonia
Magnus Ericsson and Olof Löf, May 2021
1
Contents
Background.............................................................................................................................................. 5
Scope ....................................................................................................................................................... 6
Sweden .................................................................................................................................................... 7
1. Principles for granting exploration and mining licenses ................................................................. 7
Mineral policy/strategy ................................................................................................................... 7
Key legislation and permits ............................................................................................................. 7
Ownership ....................................................................................................................................... 8
2. Fees, royalties/taxes ........................................................................................................................ 8
Concession time frames ...................................................................................................................... 9
3. Concession tendering process for non-fuel minerals...................................................................... 9
4. State participation ........................................................................................................................... 9
Poland.................................................................................................................................................... 10
1. Principles for granting exploration and mining licenses ............................................................... 10
Mineral policy/strategy ................................................................................................................. 10
Key legislation and permits ........................................................................................................... 10
Ownership ..................................................................................................................................... 10
2. Fees and royalties .......................................................................................................................... 11
Concession time frames ................................................................................................................ 12
3. Concession tendering process for non-fuel minerals.................................................................... 12
4. State participation ......................................................................................................................... 12
Finland ................................................................................................................................................... 14
1. Principles for granting exploration and mining licenses ............................................................... 14
Mineral policy/strategy ................................................................................................................. 14
Key legislation and permits ........................................................................................................... 14
Ownership ..................................................................................................................................... 15
2. Fees, royalties/taxes ...................................................................................................................... 15
Concession time frames ................................................................................................................ 16
3. Concession tendering process for non-fuel minerals.................................................................... 16
4. State participation ......................................................................................................................... 16
Hungary ................................................................................................................................................. 18
1. Principles for granting exploration and mining licenses ............................................................... 18
Mineral policy/strategy ................................................................................................................. 18
Key legislation and permits ........................................................................................................... 18
Ownership ..................................................................................................................................... 19
2. Fees, royalties/taxes ...................................................................................................................... 19
Concession time frames ................................................................................................................ 19
2
3. Concession tendering process for non-fuel minerals.................................................................... 19
4. State participation ......................................................................................................................... 20
Portugal ................................................................................................................................................. 21
1. Principles for granting exploration and mining licenses ............................................................... 21
Mineral policy/strategy ................................................................................................................. 21
Key legislation and permits ........................................................................................................... 21
Ownership ..................................................................................................................................... 22
2. Fees, royalties/taxes ...................................................................................................................... 23
Concession time frames ................................................................................................................ 23
3. Concession tendering process for non-fuel minerals.................................................................... 23
4. State participation ......................................................................................................................... 23
Queensland (Australia) .......................................................................................................................... 24
1. Principles for granting exploration and mining licenses ............................................................... 24
Mineral policy/strategy ................................................................................................................. 24
Key legislation and permits ........................................................................................................... 24
Ownership ..................................................................................................................................... 25
2. Fees, royalties/taxes ...................................................................................................................... 25
Concession time frames ................................................................................................................ 26
3. Concession tendering process for non-fuel minerals.................................................................... 26
4. State participation ......................................................................................................................... 27
Ontario (Canada) ................................................................................................................................... 28
1. Principles for granting exploration and mining licenses ............................................................... 28
Mineral policy/strategy ................................................................................................................. 28
Key legislation and permits ........................................................................................................... 28
Ownership ..................................................................................................................................... 29
2. Fees, royalties/taxes ...................................................................................................................... 30
3. Concession tendering process for non-fuel minerals.................................................................... 30
4. State participation ......................................................................................................................... 30
State participation ................................................................................................................................. 31
African states and state participation in mining projects, a few examples ...................................... 32
Angola ............................................................................................................................................ 32
Burkina Faso .................................................................................................................................. 32
Botswana ....................................................................................................................................... 32
Cameroon ...................................................................................................................................... 32
DRC ................................................................................................................................................ 32
Kenya ............................................................................................................................................. 32
Lesotho .......................................................................................................................................... 32
Senegal .......................................................................................................................................... 32
3
Mozambique.................................................................................................................................. 33
Tanzania......................................................................................................................................... 33
Japan and JOGMEC ............................................................................................................................ 33
Proposals for Estonia ............................................................................................................................. 35
Introduction....................................................................................................................................... 35
Principles for granting licenses.......................................................................................................... 35
Time frames, fees, royalties .............................................................................................................. 36
Time frames ................................................................................................................................... 36
Fees and royalties .......................................................................................................................... 37
Tendering processes.......................................................................................................................... 38
State participation ............................................................................................................................. 40
Development of a suitable legislation ............................................................................................... 41
Appendix................................................................................................................................................ 42
Mineral Auction Regime in India: Challenges and Future Outlook ................................................... 42
Sources .................................................................................................................................................. 44
Interviews .......................................................................................................................................... 44
General .............................................................................................................................................. 44
Sweden .............................................................................................................................................. 45
Finland ............................................................................................................................................... 45
Poland................................................................................................................................................ 45
Hungary ............................................................................................................................................. 46
Portugal ............................................................................................................................................. 47
Ontario .............................................................................................................................................. 47
Queensland ....................................................................................................................................... 48
State participation ............................................................................................................................. 48
Proposals for Estonia ......................................................................................................................... 48
Figure 1 Permits for opening mines in Sweden (simplified). .................................................................. 8
Figure 2 Permits for opening mines in Poland (simplified) ................................................................... 11
Figure 3 Permits for opening mines in Finland (simplified) .................................................................. 15
Figure 4 Permits for opening mines in Hungary (simplified)................................................................. 20
Figure 5 Permits for operating mines in Portugal (simplified) .............................................................. 22
Figure 6 Permits for operating mines in Queensland (simplified) ........................................................ 25
Figure 7 Permits for opening mines in Ontario (simplified) .................................................................. 29
Figure 8 State ownership of global metal production........................................................................... 31
Figure 9 Japanese model of state support for exploration .................................................................. 34
4
Background
After an initial contact in early February 2021 the Estonian Ministry of Economic Affairs and
Communications requested RMG Consulting (RMG) to submit a proposal for a comparative study of
certain aspects of mineral legislations in seven countries including conclusions for Estonia. A formal
tender document was developed and submitted by RMG. The tender was declared successful and a
contract to perform the proposed study was signed in March.
A project team from the Ministry consisting of Margus Raha and Ene Jürjens was established and
from RMG Magnus Ericsson and Olof Löf participated. Work has progressed along the lines of the
proposal and a number of project video meetings has been held where the preliminary reports and
conclusions have been presented and discussed. The data collection phase of the project was
completed in mid-April and the first version of the draft final report presented at a video meeting
May 7th. Based on the comments, questions and suggestions discussed at that meeting we have
prepared this final report.
Stockholm May 20th 2021
RMG Consulting
5
Scope
Like several other countries in the European Union and also world-wide Estonia is at present carrying
out a process to revise its mineral legislation in order to fully utilise its mineral riches according to the
long-term policies laid out in the Estonian document General principles of Earth's crust policy until
2050. In Estonia phosphate rock, rare earth elements, magnesium and vanadium, zinc, lead and iron
could be of particular interest in the context of the EU's list of critical raw materials. The lime stone
deposits are important in a national context. Further also iron, lead, molybdenum and zinc could be
of commercial interest (in alphabetical order).
It was greed to cover the following aspects of mineral legislation in a number of countries:
Principles for granting exploration and mining licenses.
Fees, royalties and time frames for granting licenses.
Tendering process for non-fuel minerals.
State participation.
Sweden, Finland and Poland were selected for study as major mining countries of Europe. Hungary
and Portugal were added as both countries have a tender possibility in their mineral legislations.
Finally, Queensland and Western Australia were included as two global leading exploration and
mining countries.
The study is mostly based on desk-top research including collection of data from government web-
sites and other relevant sources. A limited number of interviews with industry and/or government
representatives from the selected countries was made to supplement the written material.
In order to shed additional light on current status of state participation in exploitation of mineral
resources a brief survey of the situation in certain African countries has been made. A summary of
the active Japanese state participation in securing access to mineral resources is also included in the
report.
The purpose of the study is to give an international background to the Estonian legislative process.
Firstly, how to design this process in order to develop a legislation which is suitable considering the
geological and historical situation in Estonia. Secondly, in order to make the future handling of
applications for mining licenses smooth and predictable.
6
Sweden
1. Principles for granting exploration and mining licenses
Mineral policy/strategy
Sweden has since 2013 a mineral strategy whose vision is to "create growth throughout the country
through a long-term objective of using the country's mineral resources, in harmony with the
environment, nature and cultural values. Sweden strengthens its position as Europe's leading mining
and mineral Nation". Five strategic objectives identified in the strategy for the vision to be achieved:
a mining and minerals industry in harmony with the environment, cultural values and other
business activities
dialogue and cooperation to promote innovation and growth
framework and infrastructure for competitiveness and growth
an innovative mining and mineral industry with an excellent knowledge base
an internationally renowned, active and attractive mining and minerals industry.
Key legislation and permits
Exploration and exploitation of concession minerals is regulated by the Minerals Act (1991: 45). The
concession minerals referred to, are those usable industrially and of economic importance as well as
requiring extensive, systematic and often scientifically based prospecting methods. The purpose of
the Minerals Act is to define the preconditions for the exploration and extraction of concession
minerals regardless of ownership. It also means that the land owner may be forced to abandon the
land for mineral extraction against his will. The Minerals Act is commonly described as a law based
on the concessionary system with strong elements from the claim system.
Permitting authority under the Minerals Act is the Mining Inspectorate and decisions are taken by
the Chief Mining Inspector. The Chief Mining Inspector can however also refer exploitation
concession issues for primary assessment to the government, e.g. in the event of particularly large or
controversial mining projects. To get the right to explore minerals an exploration permit is required.
Before the actual exploration and survey work may begin, a work plan is drawn up. This plan must be
approved by the property owner alternatively be determined by the Chief Mining Inspector if no
agreement can be reached. To get the right to extract minerals an exploitation concession is
required. An environmental impact assessment under the Environmental Code is an essential part of
the decision basis whether or not an exploitation concession can be granted. In order to commence
mining which is classified as an environmentally hazardous activity, an environmental permit is
required under the Environmental Code. Permission is granted by the Land and Environment Court.
To access land above ground which is needed for exploitation, land must be designated. This is done
in a special land designation proceeding presided over by the Chief Mining Inspector. For the
construction of buildings in the mining area building permits are required. Moreover, a site
improvement permit is needed for excavations. These permissions are given by the local municipal
building committee.
7
Figure 1 Permits for opening mines in Sweden (simplified).
Exploration permit and Exploitation concession Land Designation
workplan •Authority: The Mining Proceeding
•Authority: The Mining Inspectorate •Authority: The Mining
Inspectorate •Legislation: The Minerals Act Inspectorate
•Legislation: The Minerals Act •Legislation: The Minerals Act
Environmental Permit Building Permit
•Authority: Land and •Authority: Municipality
Environment Court •Legislation: The Planning and
•Legislation: The Environmental Building Act
Code
Ownership
The Minerals Act does not specify anything about ownership of the concession minerals but
regulates only who under certain conditions may dispose of them. The ownership of the minerals
that are regulated in the Minerals Act is unclear. There is nothing stated that mineral resources
belong to the nation or the people. A property owner's right to dispose of the minerals, governed by
the Minerals Act can be said to be limited because someone else can get this right. Even if the state is
not seen as the true owner of the minerals covered by the Minerals Act, the state, regardless of
ownership, has a decisive influence on the exploration and exploitation of these assets.
2. Fees, royalties/taxes
The Swedish fee system intends to speed up exploration and open up areas for new applicants by
increasing fees over time. The system is composed of a fixed fee, which covers the handling costs at
the authorities giving the permits. In addition, there is a fee dependent on the area used. There are
no work commitments necessary but a work program has to be lodged and adhered to. For a mining
concession there is a similar handling fee and in addition to that a mineral compensation under the
Minerals Act. The compensation shall be equivalent to two per mill of the estimated value of the
minerals covered by the concession and mined during the year. The compensation is divided by
three-quarters given to the land owner of the concession area, and one -quarter to the state. The
compensation is aimed at giving compensation to the land owners within the concession area. The
minor part to the state is earmarked for R&D and is no royalty if understood as a tax on the grant to
extract the resource. Mineral compensation is not paid to other right holders such as lessees or
reindeer herders. Costs for surveying and land designation proceedings must also be paid by the
applicant and referred to as land allocation fee.
Exploration application fee is SEK 500 per area of 2000 hectares. Exploration fee is SEK 20 per
hectare, if the application concerns metals and industrial minerals, or an exploration fee of SEK 2 per
hectare, if the application relates to oil, gas or diamond. When extending an exploration permit the
fee is progressively increased in order to minimize the area under license.
8
Concession time frames
In Sweden there are no set time frames for granting mineral exploration permits or any other
permits. However, in 2015 the average length to get an exploration permit was 82 days for new
exploration permits. The average length to get a mining concession was 31 months in 2015.
The complete process for obtaining an environmental permit normally takes approximately two to
three years. An application at the Land and Environment Court will normally be processed in
approximately 12 to 18 months, but there are cases that has taken much longer time than three
years. The application will include all necessary permits except building permits and permits related
to cultural heritage. These approximative time frames are valid if no appeals are lodged. It has
happened in the past decade that some cases have taken much longer up to 10 years in particular if
they end up to be finally settled by the Government. These long lead times are intensively discussed
and criticised as seriously impeding the start of new mines in particular in northern Sweden where
mining contributes importantly to regional economies. These problems have been additionally high-
lighted in the present transition to a fossil free energy future where increased supply of so-called
battery metals and other elements will be crucial to the possibilities to increase production of green
energy.
3. Concession tendering process for non-fuel minerals
Sweden has no tendering process but use the process of first come first serve for metals. There is a
concession system for fuel minerals. At present there are discussions to expand the concession
system also to the shale minerals of which there are huge deposits in Sweden. They have not been
utilised commercially for the past 50 years, but they contain a mix of elements which might become
economically interesting in the future, in particular considering the transition to a fossil-free energy
supply.
4. State participation
In Sweden there is one active state-owned enterprise in mining, LKAB. LKAB operates the large-scale
iron ore mines in Kiruna and Malmberget. LKAB was a private company in the beginning of 20th
century but already in 1905 the state took an option to nationalise the company with proper
remuneration to the owners. Half the company was acquired directly at the time. The option was
finally exercised in 1955 when LKAB was made into a fully state-owned enterprise. The Swedish
mineral legislation was transformed in the early 1990’s. Until then the state had the right to, with full
compensation, take a 50 % share in any mining project. It was also prohibited for foreign entities to
hold mining rights etc. All these legal rights and rules were cancelled and Sweden became fully open
to foreign investments in this and other areas. LKAB's role has grown in recent years and it has
become a key component of the Swedish mineral cluster. It is a major European iron ore producer, a
foundation of the regional economy in northern Sweden, a driver of technological innovations and
development and a regional exploration company,
9
Poland
1. Principles for granting exploration and mining licenses
Mineral policy/strategy
There is no mineral policy or strategy sensu stricto in Poland. There is an energy policy (Energy Policy
of Poland until 2030) including also the important coal industry. De facto the present policy is to a
large extent characterised by the practices introduced during the period of centrally planning of the
economy. Mining companies are mostly state owned or state controlled. Foreign interests in Poland
meet with difficulties and activities abroad by Polish companies are rare. The environmental
permitting processes is on the other hand more decentralised than in most other mining countries,
as a reaction to the previous centralised way of decision making often without proper consideration
of local voices and environmental problems. The lack of mineral policy is a hot topic and already in
early 2015 a group of scholars and experts published a discussion paper with the eloquent title:
“Polish natural resources policy – A report about something, which does not exist but is badly
needed”. According to this report “politicians must realise that raw materials management is a truly
long-term and international business”. As far as we are aware no policy has been published until the
end of 2020.
Key legislation and permits
Exploration and extraction of minerals are mainly regulated by:
Mining Act 2011, Environment Protection Act 2001, Extraction Waste Act 2008, Act on Disclosure of
Environmental Information and its Protection, Public Participation in Environment Protection, and
the Environmental Impact Assessment 2008.
The first step in obtaining a permit to explore or mine for metallic minerals in Poland is to get a so
called usufruct, which give the right to use a mineral and also sets the fee to use the property of the
state (the mineral). A usufruct is issued by the State Treasury. With such a usufruct agreement an
appliction for a concession can be made. There are three types of concessions:
Exploration licence, this type is used for areas where the geology is not well-known (green field). The
concession gives the holder the right to explore according to a plan which has to be relatively
detailed already at the start of work.
Advanced exploration licence. This type is used for areas where the geology is better known and
where a mineralisation is already found. It is the detailed size and distribution of the deposit which is
in focus. The license permits continued exploration according to a detailed plan and possibly also test
mining of small quantities. Whether an applicant shall start with this license or with an Exploration
license is decided by the authorities.
Mining licence is a permit to mine in commercial scale. The process to apply for mineral rights is
complicated in Poland, the major steps are described in figure 2 below.
Ownership
Deposits of hydrocarbons, coal, methane together with coal, lignite, metal ores with the exception of
bog iron ore, metals in the native state, ores of radioactive elements, native sulfur, rock salt,
potassium salt, all other salts, potassium magnesium, gypsum and anhydrite, precious stones, and
curative thermal waters and brines are owned by the State. All other minerals are owned by the land
owner down to a depth where it is technically and economically feasible to mine.
10
Figure 2 Permits for opening mines in Poland (simplified)
Usufruct
•Authority: State Treasury
•Legislation: Mining act
Exploration licence Advanced Exploration
•Authority: Ministry of the License
Environment •Authority: Ministry of the
•Legislation: Mining act Environment
•Legislation: Mining act
Environmental permit
•Authority: Regional
Departments of Environmental
Protection
•Legislation: Environmental
protection act
Exploration plan
•Authority: Ministry of the
Environment
•Legislation: Mining act
Environmental permit Mining licence
•Authority: Regional •Authority: Ministry of the
Departments of Environmental Environment
Protection •Legislation: Mining act
•Legislation: Mining act
2. Fees and royalties
The Polish fee system is based on an application fee and an area dependent fee. The fees increase
with time. There are severe penalties in the form of raised fees if not 50 per cent of the original
concession area is returned at the end of the period the original permit was valid for. There are no
formal work commitments demanded but the authorities monitor the work undertaken carefully
against the exploration program. If the program has not been fulfilled heavy penalties might apply.
For the exploitation phase the system is more complicated than the system in Sweden and Finland
and varies depending on mineral owned by the state or the landowner and also which are the
minerals, metals explored for or mined. The following fees apply:
• nominal administrative fee
• annual concession fee (mining usufruct fee)
• exploitation fee (royalty) depending on the production levels
11
• special mining tax (additional royalty) in case of mining of copper and/or silver (see below).
The annual concession fee is composed of a fixed and a variable element.
• The fixed element is a percentage of the value of the deposit mined, based on its proven reserves
and varies depending on mineral mined from 0.0005 per cent of the deposit in situ value to 0.1
per cent. For metallic ores it is 0.005 per cent. The commodity price used for this calculation is
published annually by the Treasury.
• The variable element is dependent of the exploitation fee paid by the miner in the preceding year
and is calculated as a fraction (5-50 per cent) of such royalty paid in the preceding year. For
metal mining it is 30 per cent.
The exploitation fee is effectively a royalty. In Poland royalty rates are stated in the Mining Law and
are based on the value of the ores produced. If a mine is classified as a gold or copper mine etc. is
decided by the Ministry and hence also what is a by-product. By-products are taxed at 50 per cent of
the full fee.
The special mining tax, officially known as “Tax on Certain Commodities”, was introduced in March
2012 and originally covered copper and silver mining. In 2014 it was also extended to oil and gas
production. This tax is not based on profits of the company but purely on the value of the commodity
mined (regardless whether it was sold or not – the tax liability arises once metal concentrate has
been produced). As such it could be considered as a royalty rather than tax. The tax rate is
progressive and the progression is exponential. There are two formulas depending on the level of the
copper price. At present the only company in Poland paying this tax is state controlled copper giant
KGHM Polish Copper as nobody else produces copper or silver in Poland. There is a similar formula
for silver producers, at present also only KGHM Polish Copper. Exploration companies naturally do
not pay this tax as nothing is produced, but the tax has to be taken into account in any scoping or
feasibility study for future projects. For further details see the original report.
Concession time frames
In Poland there are certain legal timeframes for authorities to make decisions. It is stated that “a
license should be granted without unnecessary delay”. The time periods for decision by
environmental authorities with respect to the environmental permit are fixed. The law determines a
legal timeframe for deciding on the approval or dismissal of building-, water-, waste-, and mining
waste permission within 60 days. All such permissions can be granted in parallel.
For land-owner minerals (not metallic minerals) the average length to get an exploration licence is
estimated of 4 months. For very small deposits, less than 2 ha, mining permission is obtained
generally within 3 months. For large deposits it may take up to three to five years.
3. Concession tendering process for non-fuel minerals
Poland has no tendering process but the first come first served principle is applied.
4. State participation
KGHM Polska Miedz SA is the leading Polish copper and precious metals producer. In world terms, it
ranks among the top-ten copper producers. KGHM was created in 1991 as a state-owned joint stock
company to continue the operations of the former Kombinat Górniczo-Hutniczy Miedzi, which had
12
been producing ore from copper deposits located in southwestern Poland since 1961. The company
was part-privatised in 1997 and was listed on the London and Warsaw stock exchanges, with the
state retaining a 44.3% share. In early 2010, the Polish government sold part of its holding in the
company, reducing its stake from 41.8% to 31.8%. The political influences over Polish Copper are still
very strong.
13
Finland
1. Principles for granting exploration and mining licenses
Mineral policy/strategy
Finland has since 2010, a mineral strategy whose long-term goal is "a viable mineral area of global
competitiveness, which ensures the Finnish raw materials, increases the vitality of regions and
promotes the responsible use of natural resources". The objectives of the mineral strategy are to
promote growth and prosperity in Finland, tackling global challenges in the mineral supply chain and
reduce environmental damage. According to the vision of the mineral strategy, Finland, in 2050, is a
global pioneer in the sustainable exploitation of minerals and the mineral sector is one of the
mainstays of the economy. The mineral strategy is part of the development of the natural resource
strategy for Finland.
Key legislation and permits
Exploration and extraction of so-called mining minerals is governed by the Mining Act (621/2011).
Since 2018 there is a process running to up-date and revise this legislation. The process has slowed
down due to the Covid-pandemic but has recently gained momentum again and is expected to be
finalised during 2021. The purpose of the act is according to the opening paragraph to promote
mining and ensure that the use of the areas needed for the operation and mineral exploration is
arranged in a socially, economically and ecologically sustainable way. The Mining Act shall, on the
one hand, ensure the conditions for ore exploration and mining and on the other hand, ensure
environmental aspects, civil rights and freedoms, landowner rights and municipalities' ability to
influence. The Mining Act applies to such mining minerals and rocks that are rare and occur
randomly, and therefore requires professional exploration and significant financial risk-taking. The
Mining Act, like the older legislation, is based on the claim system which means that regardless of
who owns the property it is the one who finds a discovery that has preferential rights to extract it.
The property owner can not prohibit the deposit to be mined.
Licensing authorities pursuant to the Mining Act, is the Mining Authority and for some cases the
Government. The Finnish Safety and Chemicals Agency (Tukes) is the mining authority. Moreover,
certain matters which are to be decided by the Government, is prepared by the Ministry of
Employment and the Economy. To explore and initially develop a mine an exploration permit is
required. Minor activities so called prospecting can be carried out without the permission of the
property owner which includes geological measurements, observations as well as smaller sampling.
The samples must however be notified in advance. To establish a mine and undertake mining
activities a mining permit is required. The Government may grant the right to the mining area using
an area that belongs to someone else, which is called redemption permit for a mining area. This
decision forms the basis for the land survey office to issue an order for proceedings establishing a
mining area. Construction of the mine also requires a mining safety permit given by the mining
authority. Mining is subject to authorization under the Environmental Protection Act and requires an
environmental permit granted by the Regional State Administrative Agencies.
14
Figure 3 Permits for opening mines in Finland (simplified)
Exploration permit Mining permit Redemption permit
•Authority: TUKES •Authority: TUKES •Authority: The Government
•Legislation: The Mining Act •Legislation: The Mining Act •Legislation: The Mining Act
Proceedings for Environmental permit Building permit
establishing a mining •Authority: Regional State •Authority: Municipal building
area Administrative Agencies supervisory authority
•Authority: Land survey office •Legislation: the Environmental •Legislation: the Land Use and
Protection Act Building Act
•Legislation: The Mining Act
Ownership
The property owner in principle is entitled to the mining minerals found in the ground and governed
by the Mining Act. It does not mean that landowners have discretion regarding the right to extract
minerals. Anyone who finds a deposit has preferential rights to extract it. The state has not declared
that minerals belong to the state. For minerals that are not mining minerals and therefore not
included in the Mining Act, the property owner has the right to decide how the deposits will be
utilized although permission may be needed under the Land Extraction Act to extract them.
2. Fees, royalties/taxes
The fee system in Finland is in its intentions and structure similar to the Swedish system. This applies
both to the exploration and the mining phases even though the amounts to pay differ considerably.
There is however one important difference: In Finland the Mining Act, requires the holder of the
exploration permit also to pay all land owners within the exploration area an annual compensation,
the exploration fee. For both an exploration and a mining permit, there is a basic fee and in addition
a surcharge of 95 EUR/hour if the handling of the application takes longer time than normal. The land
owners within the mining area are paid an annual compensation, excavation fee. This fee is
composed of an area dependent part and a part equal to 0.15 per cent of the estimated value of the
mined production. Costs for the proceedings for establishing a mining area (surveys etc.) must also
be paid by the applicant. In contrast to Sweden the state of Finland still carries out some exploration
programs through the Geological Survey even if on a more limited scale than previously. Potential
deposits found in connection with basic geological research are sold in state auctions and may
include royalties within the purchase agreements. There are no statutory royalties in Finland.
An exploration permit may be extended for a maximum of three years at a time, in total, the permit
may remain valid for a maximum of 15 years.
The annual amount of the exploration fee per property shall be:
15
20 euros per hectare for each of the first four years of validity of the exploration permit;
30 euros per hectare per year for the fifth, sixth, and seventh year of the exploration permit;
40 euros per hectare per year for the eighth, ninth, and tenth year of the exploration permit;
50 euros per hectare for the eleventh and for further years of validity of the exploration permit.
The prerequisites for extension of the validity of an exploration permit are that:
exploration has been effective and systematic;
further research is necessary in order to establish the possibilities for exploiting the deposit;
the permit holder has complied with the obligations laid down in the Mining Act as well as
the permit regulations;
extension to the validity will not cause an undue burden to public or private interests.
Concession time frames
In Finland, Tukes and other authorities have no set time frames for granting exploration permits or
mining concessions. Statutory time frames are included in the Nature Conservation Act and the
Environmental Protection Act. A decision on Natura 2000 assessments must be made within 6
months. In Finland the average legal timeframe for granting an exploration licence is 120 days. In
Natura 2000 areas it is one year - as long as no appeals are made.
3. Concession tendering process for non-fuel minerals
The Geological Survey of Finland (GTK) collects and disseminates geological information. GTK is an
expert organisation accountable to the Ministry of Employment and the Economy. GTK promotes
mineral exploration and mining in Finland. GTK (the Finnish state) also carries out prospecting and
exploration work. GTK identifies and documents areas with mineral potential, in order to encourage
follow-up exploration and exploitation potential by the private sector. Prospecting results are
reported regularly, and possible new mineral indications with commercial potential are offered to
the private sector through an open tendering process arranged by the Ministry of Employment.
Except for these tenders for prospective exploration areas there are no tender processes in the
Finnish mining legislation.
In Finland a legislation which gives the opportunity to auction mineral deposits which have originally
been discovered by the exploration funded by government (through the Finnish Geological Survey
(GTK) have been in place since the 1940s. This legislation was created to find a way to ensure the
continued development of deposits explored by the GTK, which was one of the few active
exploration organisations in Finland for many decades. However, the exploration activities by the
GTK have been gradually reduced as it has been considered too risky an activity to be funded by
taxes and the state. It has been reasoned that exploration should be a responsibility of the private
sector. Hence the number of new deposits which could potentially be auctioned off has decreased
and the last auctions were held some 10 years ago. The possibility to have auctions in the future still
remains but the likelihood of new ones in the near future is low.
4. State participation
Finland has a long tradition of major state shareholdings in mining and smelting industries. The
major, also in an international comparison, Outokumpu exploration and mining company was initially
16
fully state owned. The reason for this was initially a lack of capital in Finland in the early 20th century.
A gradual privatisation process was started in the 1990s and in early 2000s it was decided that
Outokumpu should withdraw from mining and exploration and focus on stainless steel.
The Talvivaara nickel/zinc mine in Sotkamo in eastern Finland, was owned by Talvivaara Mining
Company. The mine started production in 2008 as an open-pit operation. In 2014 Talvivaara Mining
Company filed for bankruptcy in a time with low nickel prices. The state-owned company Finnish
Minerals Group funded the Terrafame Oy which took over the operation and now operates the mine.
Today Finnish Minerals Group owns 67% of Terrafame Oy with trading company Trafigura being a
minority shareholder.
Finland has set targets to be in the forefront of the EV-battery industry and the state has become a
major driver for this by the investment arm of Finnish Minerals Group and the acquisition of the
Talvivaara mine. Terrafame is building a battery chemicals plant to further process its nickel and
cobalt sulphide products. The mission of Finnish Minerals Group is to responsibly maximise the value
of Finnish minerals and aim at creating an integrated electric vehicle battery value chain in Finland.
The value of Finnish Minerals Groups shareholdings was in 2020/21 at 486 million EUR. The state-
owned group also owns a 26.3% stake in the lithium exploration company Keliber, which aims to
produce high-purity lithium hydroxide, especially for the needs of the lithium battery market. At the
end of 2020 Finnish Minerals Group signed a deal with Yara Suomi Oy for the rights to Sokli
phosphorus and iron mining project located in Northern Finland, and created the company Sokli Oy,
fully owned by Finnish Minerals Group. The strategy of Finnish Minerals Group is based on co-
investing, with the aim of attracting investments in the production of battery materials and cells, and
for recycling solutions.
17
Hungary
1. Principles for granting exploration and mining licenses
Mineral policy/strategy
There is no explicit minerals policy in Hungary. There have been attempts to write one but so far
without success. There are some passages in the existing energy policy which applies to minerals and
there is a sort of policy for the use of aggregates but not on a national level. This latter policy is
mostly a tool for land use planning. There is a need for a policy to form the foundation for future
legislation.
Key legislation and permits
Exploration and extraction of minerals is mainly governed by the Mining Act (XLVIII/1993) as
amended and applicable Government Regulations (HU-L6; HU-L7). There are a number of other laws
regulating details of the processes to obtain exploration and exploitation permits and on the
environmental permits and studies necessary. Hungarian legislation is frequently amended in
response to outcomes of court cases.
There have been some abrupt 180 degrees swings in Hungarian mineral legislation since the fall of
the Soviet Union. In 1993 a concession-based legislation was introduced only to be abandoned in
1998 and later reintroduced in 2010! Such frequent changes to the legislation have proven very
detrimental to the development of the mining industry. In the past years no exploration has been
undertaken and there are only a few small metal mine operations running. The previously important
bauxite mining has stopped, the promising Recsk copper/gold deposit was on tender a few years ago
but in the end no bids were made. Most probable reason is that the conditions set by government
were too harsh to make the potential mine an attractive proposition.
Areas "open" and "closed" for exploration are key concepts in the Hungarian mining legislation. In an
"open area" exploration permits are granted by the regional "Government Office" but in a "closed
area" permits, in the form of a concession following a tendering process, are only given by the
central authority the Hungarian Office for Geology and Mining (MBFH)/Hungarian Geological Survey
(MBFZ). In 2010 all of Hungary was declared as a closed area for exploration and mining of metallic
minerals, fuel-minerals and using of geothermal energy.
Since 2015 the MBFH is hence, in effect, the responsible central authority acting as a one-stop-shop
agency responsible for administrating the Mining Act and all permitting procedures for metallic
minerals. For other minerals (aggregates and industrial minerals) decision making is decentralised to
the 20 (19 counties and Budapest) regional so-called Government Offices. They are responsible for
permitting of all exploration and exploitation applications for these raw materials. These offices are
responsible for mining, environment, cultural heritage and all other legislation relevant to an
application for an exploration permit.
If a decision from one of the regional Government Offices is appealed the MBFH and other relevant
central authorities such as the National Inspectorate for Environment, Nature and Water step in and
are included in the process. The right to appeal a decision made by a regional Government Office is
granted to a wide group of persons and entities not only the directly involved. Appeals of the
decision made by the regional Government Offices are very common. In a third step the decision
made by the MBFH can be appealed in the judicial system's three levels.
18
The procedure for obtaining a permit to explore for and exploit deposits in "open areas" i.e.
aggregates and industrial minerals is at least in theory relatively simple and straight forward and
could start within 2-3 months. The permitting process has two steps: an initial exploration permit
which requires a minimum of data such as the area where work is planned. The second step is to
submit a Technical Operation Plan, a work plan, when this plan is approved exploration work can
start. A similar two staged process is used also when applying for an exploitation permit.
The final exploration permit is given for four years with a possibility to extend for maximum 2+2
years.
The process to obtain an exploration permit and exploitation permit for metallic minerals are
described below. It is important to note that an application for a permit can only be lodged after the
tender process has been concluded. This adds, of course, considerable risks for a tendering company:
In spite of winning the tender the project might not get all necessary permits and it will not be
possible to go ahead.
Ownership
All mineral resources in Hungary belong to the state.
2. Fees, royalties/taxes
To hold the right of a concession a certain fee must be paid, or an alternative compensation must be
provided to the state. In the concession tendering process, the minister shall set the minimal amount
of concession fee, but the applicant may offer a higher amount. The following figures give the "usual"
rates. The fee for exploration permit is: 100 EUR; exploration approval: 170 EUR; exploration final
report approval: 170 EUR; drilling permit: 450 EUR. A mining plot permit: 400 EUR (300 EUR for open
pit); extraction approval: 300 EUR (170 EUR for open pit); remediation plan approval: 140 EUR; mine
waste management plan approval: 120 EUR; mine waste management facility permit: 200 EUR; other
mine facilities (incl. processing plant) construction permits: 100 - 400 EUR.
In exchange for exploiting any mineral resource upon a concession contract, the Hungarian State
shall be entitled to mining royalty. The lowest rate of the mining royalty payable on the basis of the
concession contract shall be fixed individually in accordance with the decision of the responsible
minister for each tendered area. The minister shall publish the lowest rate of the mining royalty both
in the Call for Tender and the tender announcement. The tenderer may overbid the royalty rate set
by the minister in the tender. A royalty of 2 % applies for mineral ores for non-ferrous metallic minerals
from underground extraction and 5 % for non-ferrous metallic minerals from open-pits. Values often used
are provided by the Government Regulation (HU-L8): aggregates: 3-40 EUR/m3, industrial minerals: 4-130
EUR/m3, metallic ores: 150- 200 EUR/m3.
Concession time frames
If the entire process runs smoothly and according to all rules, applicants for aggregates and industrial
minerals in open areas may start exploration within 2-3 months, and extraction within 1-1.5 years.
For ore minerals in closed areas subjected to a tendering process another 1.5-2 years is needed for
the concession procedure.
3. Concession tendering process for non-fuel minerals
The concession tendering process is much more complicated than the application process for "open
areas" and very few if any concessions have been granted for metallic minerals in the past decades.
The process can be initiated either by government or by an applicant (company or private person).
19
The first step is to prepare a so-called Complex Environmental Vulnerability Study (CVS), which gives
an overview of environmental, land use, health and safety and other impacts in a process including a
range of government agencies and also public input before being finalised. This study is done by the
MBFH. When the CVS is completed, tender documents are prepared by the relevant authorities and a
call for tenders is published. The tender process itself is regulated in detail. When the negotiations of
the tender contract are finalised, a similar process as described above for "open areas" starts for the
concessionaire to obtain all necessary permits for exploration and later exploitation. The concession
is given for 35 years and can be extended for another 17.5 years.
Permits for exploration for metallic ores are subjected to a tendering process. The closed areas of the
country are reviewed every fifth year in respect of potential mineral resources and qualify them as
closed. The Minister of Innovation and Technology is responsible for mining affairs. In closed areas, it
is the minister who grant the right for exploration of mineral resources in the concession contract.
Concession tenders are prepared by MBFH/MBFSZ.
Figure 4 Permits for opening mines in Hungary (simplified).
Complex Vulnerability
Study (CVS) Review of CVS Concession tender call
Authority: MBFH Authority: Ministry of
Authority: Various
National Development
Legislation: Mining Act Legislation: Mining Act
Legislation: EU and national
Conclusion of
Environmental permit Exploration permit
concession contract
Authority: National Inspectorate
Authority: Ministry of Authority: MBFH
Environment, Nature and Water
National Development Legislation: Mining Act
Legislation: Environmental Act
Legislation: EU and national
Exploitation permit
Authority: MBFH
Legislation: Mining Act
The submission of a tender proposal shall only be possible after purchasing the tender
documentation and depositing a bid bond. In evaluating the tenders, the minister shall set up a
committee. The Committee shall review the tender applications and suggests the winner of the
tender for the minister. The minister will grant the concession based on the suggestion of the
Committee. As outlined above the tender process has not been applied successfully in recent years,
at least not for metallic minerals. The system has worked a little better for coal. But in summary it
seems as if the intention with the present complicated tender system might not have been to stop all
exploration and exploitation of metals but that has been the practical effect.
4. State participation
There are no demands nor legal provisions for state participation in mining projects.
The Hungarian bauxite mines owned by the state aluminium company were privatised in 1995. In
2013 the mines were nationalised again after the private company went bankrupt. Bauxite mining
operations were gradually closed down and all bauxite mining was stopped in 2018.
20
Portugal
1. Principles for granting exploration and mining licenses
Mineral policy/strategy
The Portuguese National Strategy for Geological Resources – Mineral Resources was launched in
2012. The strategy aims to promote a mining sector which is:
Dynamic, ensuring continuing investments and proper exploitation of the resources
Sustainable at economic, social, environmental and territorial levels
Capable to promote the growth of the national economy, by ensuring supply of essential raw
materials and reinforces its contribution to the national Gross Domestic Product and exports
growth.
Capable to promote regional development, ensuring the economic revenues and
employment for local people and development of local communities.
Key legislation and permits
The main regulatory framework for exploration and exploitation of mineral resources is:
Constitution of 1976.
Law no 54/2015
Minerals Law decree law no 88/90 which sets out the detailed regulations of mineral
deposits.
These laws apply to metallic minerals of "high economic interests". Aggregates and some industrial
minerals are called "mineral masses" and follow other legislations as is also the case for fuel
minerals.
The Mineral Law decree of 1990 is about to be replaced by new regulations in order to fit better with
the new Law from 2015. The introduction of these new regulations has been delayed for some years
but is expected to be adopted in Cabinet in May this year. The new regulations are expected to give
the mining and exploration sector in Portugal a boost.
The Directorate General of Energy and Geology (DGEG) is the responsible authority for issuing
permits for exploration and extraction of mineral deposits. DGEG is organised under the Ministry of
Economy. DGEG is a so called “one stop shop”. However, for the mining phase specific competencies
governed by other authorities regarding for example health and safety, nature conservation and
cultural heritage may also apply. DGEG is also the controlling instance and monitor the exercise of
the operations covered by the contracts. The municipal authorities of the area covered by the
application are involved in the environment and spatial planning. Local authorities’ comments will be
taken into account, but the Minister of Economy (DGEG) is the sole granter of mineral licenses.
The Portuguese Environmental Agency (APA) issues environmental permits for exploitation contracts.
No specific environmental permit is necessary for exploration.
The exploration contract contains details of work commitments including investment amounts, time
frames and possible annual fees. The contract is usually valid for no more than five years including an
initial 1-2 years followed by maximum three extensions of one year each. At each extension the
licensee shall reduce the area of exploration by a minimum of 50 %. To continue operations the
licensee must submit progress reports twice every year. When an area is abandoned all results will
21
immediately become publicly available to promote further exploration. There is a prescribed public
consultation process for all projects.
If there are more than one company applying to explore the same area, the DGEG can decide to open
a public tender. This procedure is however very unusual, even though the mining law includes this
possibility. A successfully concluded exploration contract will automatically give the licensee the
possibility to apply for an exploitation contract. There is also the possibility of a public tender If
understood as strategic for the national economy, a mineral deposit can be made available through
competitive bidding, for which it will be published in national and local newspapers where deadlines
for proposals are set. Please see below.
An application for an exploitation contract is also handled by the DGEG. The application should
contain an environmental impact assessment which will be scrutinised by the APA and the
internationally usual plans such as mine plan, health and safety plan, a landscape recovery plan,
waste management plan and an economic pre-feasibility study. For operations with an extraction
rate of 200,000 tonnes or more or larger than 15 hectares an EIA and a protection plan must be
submitted to be approved by the Environment Ministry as a condition for the award of the contract.
The extraction application will be advertised through a public consultation but the decision, If the
environmental impact study is approved by the APA the DGEG alone makes the final decision.
Matters related to mining permitting were previously handled by the Ministry of Economy and
Industry but were in 2018/19 handed over to the Ministry of the Environment. From industry this has
been seen as unfortunate and they have requested a switch back to the previous organisation. It is
not known today what will happen. Some observers are worried that the new Law Decree will make
it more difficult to get exploration and exploitation permits in the future.
Figure 5 Permits for operating mines in Portugal (simplified)
Exploration permit
Environmental permit
•Authority: Directorate General
of Energy and Geology (DGEG) Authority: Portuguese
and Minister of Economy Environmental Agency (APA)
• Legislation: Mining Act Legislation: Environmental Act
Mining permit
Authority: DGEG and Minister of
Economy
Legislation: Mining Act
Ownership
All metallic and minerals and industrial minerals are owned by the state. Construction minerals
including limestone belongs to the landowner.
22
2. Fees, royalties/taxes
For an exploration license there is a annual fee levied which is based on the surface area of license. In
some cases an exploitation contract may include payment of annual or otherwise fees. However, an
applicant will have to cover the following costs:
Publication of the DGEG's decision in the official journal
A provisional bond to ensure that the applicant will execute the concession as agreed
All costs associated with the execution of the concession contract.
Royalties and other financial compensation are negotiated on a case-by case basis and included in
the concession contract. The rates usually vary between 2-5 % of the value of production at the mine
gate.
Concession time frames
There are no fixed legal timeframes for the authorities to make any decisions or answer questions. In
practice, exploration permits and mining concessions are granted on average in 7 and 11 months
respectively, if no appeals are made. The main reason for these low timeframes is the “one-stop-
shop” system. The last 30 years Portugal has only had minor court cases, and only at local courts,
challenging decisions made by the DGEG.
To receive an extraction permit takes about 5 months after the approval of an environment impact
study. This study is evaluated by a steering committee coordinated by the environment authority
during 4-6 months. On average, it takes any project eleven months to get necessary permits.
3. Concession tendering process for non-fuel minerals
If a mineral deposit is defined as strategic for the national economy there can be a public tender.
Recently there has been a strong interest from Government in the lithium industry. Portugal is the
top producer of lithium in Europe and the lithium resources are considered to be of national interest
and Portugal has prepared for a tender process. In 2018 the government approved a resolution
known as the “Lithium strategy” envisaged to boost Portugal's lithium industry, but not only in
mining but also in processing lithium. However, the tender process has been delayed for several
years because of uncertainty of a new law clarifying “new environmental requirements”.
The importance of local communities will probably increase in the new Law decree soon to be
adopted. Demands for a preliminary environmental study to be done already before applying for a
license will most probably be part of the new regulations. It is now expected that the tender process
for lithium will start later in the year.
4. State participation
There are no demands nor legal provisions for state participation in mining projects.
23
Queensland (Australia)
1. Principles for granting exploration and mining licenses
Mineral policy/strategy
According to the national strategy for exploration, which applies to Australia as a whole, the vision is
to see the potential of the deposits that have not been investigated effectively because of protective
layers of sand and sediment. Creating trusting relationships with the community and stakeholders in
the regulation of the sector is also a priority as well as building a culture that can manage risks in
different ways.
Queensland's most prospective part is its so-called North West Mineral Province. In a document from
2017 A Strategic Blueprint for Queensland’s North West Minerals Province is a platform for the
Queensland Government to facilitate a strong future for the region that builds on its economic
strengths and supports strong communities. The strategic blueprint leverages existing initiatives and
focuses on three strategic priorities:
1. Facilitating continued resources sector development
2. Diversifying the regional economy and creating employment opportunities
3. Working with businesses and communities to deliver integrated and appropriate services.
Most importantly, the strategic blueprint aims to provide a strong foundation to galvanise integrated
and ongoing partnerships with federal, state and local governments, business, industry and local
communities, to support strong and prosperous regional communities in the Province.
Key legislation and permits
Exploration and extraction of minerals is regulated in the Mineral Resources Act 1989. The various
states in Australia have their own laws on mineral that is found on land. A mining project may still be
subject to federal legislation in areas such as trade, fiscal, indigenous people and environmental
protection. Mining Act applies to minerals owned by the Crown (State of Queensland) which is the
most common situation. If the minerals are privately owned, the law does not apply. Mineral rights
are granted by the state on the basis of a claim system ("first come first served"). The law has a broad
definition of minerals, including all natural substances. There are a number of substances defined as
minerals only when they are on land owned by the Crown. If sand, gravel, limestone or shale are
located on private land the rules of the local authorities instead apply. Besides the Mining Act, State
Agreements are used to regulate large-scale, capital-intensive mining projects. These contracts may,
in addition to granting rights to the deposit, include provisions on the development of infrastructure,
housing and finance.
The Department of Resources is the responsible department/ authority for the granting of mineral
rights (mining tenements or mineral titles) under the Mineral Resources Act. The Mineral Resources
Act is administered by the Minister. Before any exploration activity or resource production can take
place in Queensland, the appropriate resource authority needs to be obtained. Either there is a direct
application, which is the case for most metals and minerals, or through a competitive tendering
process in some cases. Competitive tendering applies to petroleum and gas, coal and, where
appropriate, mineral exploration. When applying for any resource permit, applicants need to apply
for an environmental authority to be covered for the activities that will be carried out. Depending on
the resource project's level of environmental risk, the project needs an environmental authority, a
variation application, or a site-specific application. The Department of Environment and Science
24
(DES) grants environmental authorities for mining and exploration under the Environmental
Protection Act 1994.
Ownership
Generally, all mineral and coal resources in Queensland are owned by the state.
Figure 6 Permits for operating mines in Queensland (simplified)
Enivrionmental authority Prospecting/exploration- Mining proposal
license
•Authority: Department of •Authority: Department of
Environment and Science. • Authority: Department of Resources
Resources.
•Legislation: Environmental •Legislation: Mineral Resources
• Legislation: Mineral Resources Act
Protection Act Act
Mining lease Building license
•Authority: Department of •Authority: Local Authority
Resources •Legislation: Building and
•Legislation: Mineral and Construction Commission Act
Energy Resources (Common
Provisions) Act
2. Fees, royalties/taxes
Depending on the mineral, the royalty rate payable under the Mineral Resources Regulation 2013 is
either a percentage of the value of the mineral or a flat rate per tonne. The value of a mineral (other
than coal seam gas) is calculated by determining the gross value of the mineral and deducting certain
permitted expenses. Royalty rate for base- and precious metals, which includes cobalt, copper, gold,
lead, nickel, silver and zinc, varies between 2.50% and 5.00% (varying in 0.02% increments) of value,
depending on average metal prices. The rate for each period for calculating the royalty is published in
an official gazette. Processing discount applies (except gold and silver), royalty-free threshold applies
as follows:
No royalty is payable on the first AUD 100,000 of the total value of a relevant mineral, mined
under a mining operation, that is sold, disposed of or used in a financial year.
If more than 1 relevant mineral mined under a mining operation is sold, disposed of or used
in a financial year—
o the person by whom the royalty is payable under the Act for the minerals must
nominate one of the minerals (the nominated mineral); and
o no royalty is payable on the first AUD 100,000 of the total value of the nominated
mineral that is sold, disposed of or used in the financial year.
However, if less than AUD 100,000 of value of the nominated mineral is sold, disposed of or
used in the financial year, the person may repeat the process under subsection (2) until the
combined value of the relevant minerals nominated by the person and sold, disposed of or
used in the financial year reaches AUD100,000.
25
A mineral development licence (MDL) is issued so that a company can evaluate the development
potential of the defined resource. An MDL can be granted if the company hold an exploration permit
where there is a significant mineral occurrence of possible economic potential.
The MDL allows companies to conduct geoscientific programs (e.g. drilling, seismic surveys), mining
feasibility studies, metallurgical testing and marketing, and environmental, engineering and design
studies. A mining lease allows you to machine-mine for specified minerals and conduct other
activities associated with mining or promoting the activity of mining. Mining leases cannot be
granted or renewed unless compensation for landholders has been settled, either through a
compensation agreement or Land Court determination. A mining lease application may be refused if
it doesn’t have an agreement or haven not applied to the Land Court within 3 months of:
the day the Governor in Council consented to your application
the last objection day for the application (if no one objected to your application)
the day the Land Court issued a recommendation about the grant of the mining lease.
Concession time frames
The Department of Resources has detailed data on how long-time different applications take. In 2020
the median application duration for new exploration permit applications was 9 months. 75% of the
exploration permits were handled within 12.8 months. For renewal of exploration permits the
median was 2.3 months and 75% were handled within 3.5 months. For a mining lease in 2020, the
median application duration was 28.7 months while renewal was 11.5 months. The Department of
Resources aims to complete 80% of targets within the timeframe. There are certain targets for
different steps in the permitting for exploration applications and mining leases. The targets for
exploration mining applications are: Initial assessment 2 business days, technical assessment 40
business days, decision summary 30 business days. For production mining leases the targets are:
Initial assessment 2 business days, technical assessment 5 months, decision summary 3 months.
The time taken for each individual application may be influenced by tasks outside the control of the
department, such as native title and environmental assessments, hence the discrepancy between the
targets of the Department and the actual time for approving applications.
3. Concession tendering process for non-fuel minerals
A tendering process applies to petroleum and gas, coal and, where appropriate, mineral exploration.
In general, there are no tendering process for minerals in Queensland. For example, the most recent
tender was on a greenhouse gas storage exploration.
Competitive tendering ensures Queensland's resources are responsibly managed by allocating
exploration rights to companies that have the greatest exploration and development capacity for
these resources. It also provides a fair and transparent process for awarding a preferred tenderer.
The tendering process comprises two stages- the tender itself, where applicants tender for the right
to be an applicant for a tenure, and the actual application process. It takes in average 3.6 months for
to be awarded successful tendering status, after that the applicant proceeds to stage two, the
application. To commence a call for tenders the Minister will publish a gazette notice (a call for
mining lease tenders) inviting tenders for an eligible person to apply for a mining lease.
A rigorous process is in place to assess tender applications and select a preferred tenderer. The
process and criteria are outlined in each call for tender document and typically include consideration
of the applicants’ financial and technical capabilities and their strategy for engaging with the
community. Preferred tenderers must meet environmental and other approval requirements (e.g.
land access and compensation) before the resource authority is granted.
26
The selection of tender areas is based on a range of factors including:
environmental, regional and state planning interests (e.g., constraints such as priority living areas
and national parks).
the area's potential for GHG storage.
commercial and market considerations.
competing land uses.
current geological knowledge.
4. State participation
There are no demands nor legal provisions for state participation in mining projects in Queensland.
27
Ontario (Canada)
1. Principles for granting exploration and mining licenses
Mineral policy/strategy
Ontario has since 2015 a mineral strategy that replaces the first strategy from 2006. The vision for
the province's mineral sector is to become a global leader. Four strategic priorities for the industry
are highlighted in the strategy. The industry should be kept competitive and innovative, safety and
environmentally responsible, efficiently and effectively regulated, growing and prosperous by
enhancing aboriginal voices and meaningful participation, and building a highly-skilled workforce.
Key legislation and permits
Exploration and extraction of minerals is regulated in the Mining Act. The vision behind the first
mineral strategy led, inter alia, to a modernisation of the Mining Act in 2009. The various provinces in
Canada have their own laws on mineral that is found on land. A mining project may still however be
subjected to federal legislation regarding trade, indigenous people, environmental protection and
the impact on fisheries and navigable waters. The Mining Act applies to minerals owned by the
Crown. Minerals under the Act is defined as any naturally occurring minerals (metals and non-metals)
including gas, petroleum, coal, salt, quarry, gold, silver and precious metals but does not include
sand, gravel and peat. Sand and gravel are regulated in the Aggregate Resources Act. For some
minerals such as limestone and marble provisions are in both the Mining Act and the Aggregate
Resources Act. The purpose of the Mining Act is to encourage prospecting, staking and exploration
for the development of mineral resources that is consistent with the aboriginal rights, including a
duty to consult, and to minimize the impact of these activities on public health, safety and the
environment. Mineral rights are granted through a claim system.
Indigenous rights are protected under the Constitution. Many Aboriginals in Ontario (First Nations
and Métis) have aboriginal rights or treaty rights. Contacts with these groups should be maintained
throughout the process of opening a mine. To support that the aboriginal rights are recognized
during exploration and mineral extraction, a number of guidelines (policies) has been developed
within the ministry responsible for mining.
The first step to get exclusive rights to explore is to claim an area. However, to gain access to land
that is open for claiming a prospector's license is required. This right is not exclusive but is a
prerequisite for claiming land. The most common way of claiming land is that the selection is done in
the field (claim staking). Detail rules on staking applies and marking should be done in a square or
rectangular shape. Besides claims there is also a permit called exploratory license of occupation (ELO)
which allows the exploration of land and water areas more desolate located and where the minister
can impose various conditions adapted to each case.
To get a right to extract the minerals it is required that a mining claim is transferred to a lease (land
acquisition). The right to transform a claim to a lease is predetermined according to the Mining Act
provided the legal requirements are followed. A mining lease is granted by the Ministry of Natural
Resources. A lease can be issued for mining rights and surface rights or mining rights only alternative
surface rights only. Unless the Crown holds the surface rights, such rights cannot be obtained other
than that agreed with the owner. All deposits and minerals taken from the soil obtained according to
the Mining Act must be treated and refined in Canada unless an exception is made. A lease is
transferable after permission.
In order to perform certain exploration activities on both claims and leases an exploration plan must
28
be submitted to the Ministry of Northern Development and Mines (MNDM) before work can begin.
The plan is used to inform aboriginal communities, government, land owners and other rights
holders. Depending on the activities to be carried out an exploration permit can also be required. The
system of exploration plans and exploration permits are used early in the exploration phase for
activities that cause minimal to low impact on the environment. Prior to a more advanced
exploration work, a closure plan must be submitted to the MNDM. A financial assurance is part of the
plan and must also be handed in to ensure that the restoration work will be carried out.
The number of mining projects that involves an environmental assessment process (EA) and the
extent of these vary by the type of permit required and size of the project. Sometimes a project is
also required to be examined under federal law. Several environmental permits may also be
required. If surface water or groundwater are affected a permit to take water is required. Emissions
into the air require an environmental compliance approval. For the construction of a building a
building permit is required from the municipality. For structures and buildings located on Crown land
a work permit is needed which is given by the Ministry of Natural Resources. Work permits are also
required when roads are constructed on Crown land and when water crossings are affected.
In order to streamline the permit process there are mineral development officers within MNDM
whose role under the Mining Act is to coordinate and facilitate communication with the industry, the
public and government departments and agencies.
Figure 7 Permits for opening mines in Ontario (simplified)
Claim Exploration permit Lease
•Authority: Ministry of •Authority: Ministry of •Authority: Ministry of Natural
Northern Development and Northern Development and Rresources
Mines Mines •Legislation: Mining Act
•Legislation: Mining Act •Legislation: Mining Act
Closure plan Environmental Compliance Building permit
approval
•Authority: Ministry of •Authority: Local municipality
•Authority: Ministry of
Northern Development and •Legislation: Planning Act
Environment
Mines
•Legislation: Environmental
•Legislation: Mining Act
Protection Act
Ownership
Since the Crown controls most of the land areas, ownership of minerals is also often linked to the
state or Crown. Since the early 1900s, the Crown also reserved the mineral rights in most new land
concessions or grants but historically there have been different approaches. If the Crown has not
reserved the mineral rights on the land granting the minerals are privately owned. A distinction is
made between the mineral rights and the surface rights. Mineral rights are defined as rights to
minerals located in, on and under a piece of land.
29
2. Fees, royalties/taxes
In Ontario the fee to register a claim varies depending on the number of units, 1 unit (16 ha), applied
for. In addition, there is a requirement for annual work to be performed. If no work is performed the
claim might be lost. The application fee for a lease is 75 CAD and the annual lease (rent) is 3 CAD per
hectare. Since 1907 a tax on land (mineral rights) used for exploration and mining (mining land tax) is
levied. The tax is 4 CAD per hectare per year.
Royalties are payable for diamonds on a portion (percentage) of the net value of the output
according to the Mining Act. Large areas are held in public ownership. The Crown can here be seen as
a landowner in addition to an owner of the minerals with demands on payment for land (rent) and
minerals (royalty or tax). For further details see the original report.
3. Concession tendering process for non-fuel minerals
Ontario has no tendering process but use the process of first come first served.
4. State participation
In Ontario there are no state participation in mining.
30
State participation
The mining industry has since centuries been in focus for government control in mineral rich
countries. The supply of metals and minerals is vital to economic and social development and hence
politically important. Taxation of the mining industry has also generated direct income to
governments. Metals and many of the most valuable minerals in the ground belongs to the state in
almost all countries. Sand, gravel and rock often belong to the landowner. But in all countries the
state regulates exploration and mining of all minerals in detail in order to meet a number of
politically set goals: facilitate mining and production of metals, reduce risks and damage to the
environment and workers' health and safety, generate income to the state, create jobs and economic
development, minimise wasteful use of non-renewable resources and others.
Another frequently used way of securing benefits from mining is through state ownership of mines
and smelters. State control over global mine production has varied considerably over the past 50
years as shown in Figure below. After a peak in the early 1980s and a trough in early 2000s the level
is nowadays growing with increased mine production controlled by Chinese state-owned mining
companies in China and elsewhere.
Figure 8 State ownership of global metal production
(% of total global value of mine production)
Source: Overview of State Ownership in the Global Minerals Industry
In the early 2010s triggered by the high metal prices during the so-called "super cycle" the discussion
restarted over increased state ownership in the mining sector. State participation as owner in mining
companies was seen a means to capture some of the high profits made by mining companies and
through seats on the company board to gain insight and some control over the running of the
company and its strategy. This discussion was particularly lively among African countries and in many
of them legislation was introduced to guarantee governments, most often, free-carried access to 10-
15 % of the share capital in all mining ventures. In some countries there is a possibility for the state
to take up to a 50 % share in mining projects with compensation. For an overview of the situation
among African countries please the next section.
31
African states and state participation in mining projects, a few examples
Angola
The Mining Code provides that, in consideration for granting mining rights, the Angolan state shall be
entitled to compensation. Such compensation shall be in the form of a participation of not less than
10% in the company that conducts activities and/or in-kind allocations of the minerals to be
extracted.
Burkina Faso
Concession of an exploitation permit entitles the state 10% free of charge participation in the share
capital of industrial exploitation companies.
Botswana
Upon the issue of a mining licence, the government shall have the option of acquiring up to 15%
working interest participation and shall inform the applicant as to whether or not it is exercising its
option. If the government does decide to exercise its option, it shall be issued a single special share,
which shall carry the right to appoint up to two directors, with alternates, and to receive all dividends
or other distributions in respect of its working interest percentage and shall be obliged in the same
manner as other shareholders to contribute its working interest percentage.
Cameroon
The state shall hold 10% of the total share capital of the small-scale mining company. As resource
owner, the state shall be entitled to the said shares free-of-charge and without any encumbrances.
Shares held by the state shall not be subject to dilution in the event of share capital increase.
However, the state may increase its shares in the capital for profit purposes, by mutual consent of
the parties, in proportions not exceeding another 10% and the remaining shares shall be open to
subscription by national foreign investors.
DRC
In the DRC the mandatory free state participation in the equity increased recently from 5 % to 10 %
and a new requirement for at least a 10 % mandatory participation of DRC individuals in the equity of
newly constituted mining companies.
Kenya
Under the new law, the state can acquire 10% free carried interest in the share capital of large scale
mining operations and/or those relating to strategic minerals, and reserves the right to obtain further
interests at arm’s length prices. Regulations stipulating the exercise of this provision will be
developed and published.
Lesotho
The government may, through the Ministry of Natural Resources, acquire not less than twenty
percent shareholding in a proposed mine, and is required to inform an applicant of a mining lease as
to whether the government is taking up shareholding in the proposed mine.
Senegal
The government is to be awarded for free 10% of the equity of the resource company that will have
to operate the exploitation. The government can also negotiate for him and/or the private national
sector an additional 25% equity interest.
32
Mozambique
In August 2014, the Mozambican parliament approved Mining Law No. 20/2014 along with a
new Specific Regime of Taxation and Fiscal Benefits for Mining Operations Law. These laws provide
for the right of the state to progressively increase its participation in all mining projects, a 32 % tax
on capital gains arising from the direct or indirect transfer of mining rights, and a 10 % income tax on
revenues arising from services provided by non-resident entities to mining companies located in
Mozambique.
Tanzania
The government shall obtain not less than 16% non-dilutable free carried interest shares from a
mining company/person holding a mining license or special mining license. The government may
acquire up to 50% of shares in a mining company/person holding a mining license or special mining
license equal with the total tax expenditures incurred by the government in favour of such mining
company.
Japan and JOGMEC
Japan Oil, Gas and Metals National Corporation (JOGMEC) was established in 2004. JOGMEC
integrates the functions of the former Japan National Oil Corporation, which was in charge of
securing a stable supply of oil and natural gas, and the former Metal Mining Agency of Japan, which
was in charge of ensuring a stable supply of nonferrous metal and mineral resources and
implementing mine pollution control measures.
The purpose of the merged organisation is to secure a stable supply of mineral resources to Japan,
which are indispensable for Japanese industry. JOGMEC contributes to a wide range of fields
including surveying, exploration, development, production and stockpiling to recycling and
environmental protection. The agency has over 600 employees mainly in Japan but also overseas all
around the world. Annual budget is around 15 billion USD. The agency works in close cooperation
with Japanese industry and forms joint ventures also with foreign companies and governments. On
its web page JOGMEC says:
" While implementing and assisting geological exploration in prospective areas for metal resources,
JOGMEC also supports exploration and development by Japanese companies by providing equity
capital and liability guarantees. JOGMEC also actively carries out technological development and
provides technical support in each stage of metal resource development, and operates national
stockpiling programs as a safeguard against disruptions to the supply of rare metals, which are
unevenly distributed by region. In addition, JOGMEC is working on environmental protection including
projects for mine pollution prevention and associated project development, as well as proactively
providing related technology and knowledge to resource-rich countries."
JOGMEC has developed a model how to cooperate with, mostly Japanese but also foreign,
commercial companies shown in the figure below.
33
Figure 9 Japanese model of state support for exploration
Source: Jogmec website.
JOGMEC offers an interesting model for a country how to engage more actively in mineral
exploration and development. It is a rather unique entity world-wide. It is to a large extent based on
the fact that the dependency for Japan on imported mineral resources whether energy resources or
minerals is almost 100 % and the country has in general a more vulnerable supply situation than both
the EU and the USA. The close cooperation between the Japanese state and Japanese companies
and between the companies has long traditions both in the Sogo Shosha system and the
understanding of the security of supply aspects since the Japanese economic wonder in the 1960s.
34
Proposals for Estonia
Introduction
Mining is a global industry. Mining companies compete internationally and prices are set on world
markets and are often highly volatile. Development of the mining industry in any country is heavily
dependent on global trends not only in demand and prices for specific metals or minerals but also in
mineral legislation and regulations. Politically decided mineral strategies and policies in mineral-rich
industrialised countries, not least the European Union, are becoming increasingly comparable and
related legislation more similar than has the been the case historically.
During the past decade many countries are reviewing their mineral policies and legislations in order
to maintain the competitiveness of their mining industry and their attractiveness to investors, both
foreign and domestic and to improve the public acceptance of the mining sector. Industry's demand
for stability, predictability and continuity in legislation and fiscal regime must also be considered and
not least the cost and time necessary to review legislation and possibly introduce a new one. It has
become more important and difficult to strike a balance between the different and often conflicting
political goals such as environmental protection and social acceptance of mining operations and
increasing demands for in particular elements necessary for the green transition.
To find workable models to balance these interests often striving in different directions will become
more important for all countries, including Estonia, hoping to use their mineral resources for
economic and social development into the future. Transparent processes with clear routines for
stakeholder participation will be absolutely necessary and mechanisms to balance local, national and
possibly international interests will be required for success.
Principles for granting licenses
The mineral strategy of Estonia is set in the document General principles of Earth's crust policy until
2050. It is stated that "the natural resources found … are explored and used in a way which creates
as much value for Estonia as possible, at the same time considering the environmental, social,
economic, geological and security aspects of these activities". The state will actively try to attract
investments necessary to develop the resources and implement mechanisms to ensure maximum
benefits from exploration and exploitation. At the same time these activities should support positive
socio-economic changes and mitigate negative environmental and socio-economic risks. These clear
long-term goals for the mining sector form a solid basis for future developments and without such
outspoken political will the mineral legislation and regulations as well as the fiscal regime will not be
sufficient to attract investments into exploration and mining. Uncertainties and risks perceived by
investors, whether national or international, increases and the interest to make investments is
reduced.
The details of a tendering process will be discussed further down in this section. Suffice it here just to
mention that perhaps the best option would be to introduce an auctioning regime for areas and/or
minerals which are well known and where a sufficient interesting geological basis for a tender is
available. For other areas and/or minerals where the unknowns are dominating a first come first
serve process might be less costly but still generate sufficient exploration to meet the long-term
goals for the mining industry.
35
To obtain a social license to operate is becoming increasingly important for the timely and successful
implementation of an exploration and later mining project. There are experiences from many
countries, also among the ones studied in this report, of various options to create a cooperative
environment. Giving transparent information at an early stage to all stakeholders seems to be the
foundation of most of these experiences. To learn from these will be crucial to both the acceptance
of the present attempt to revise the legislation and the fiscal regime and more importantly for the
success chances of future exploration and mining projects. Among other aspects it will be necessary
to strike a balance between local and national interests. There is often strong local demands to get a
share of the profits of a mine or "our geological patrimony" as it is often stated. But it must be clear
that a deposit in the ground has no value and a local community has not done anything to "create" a
mineral deposit. It is only when geological exploration is carried and finds are spent on investigating
and delineating the deposit that value is created. Another frequent demand is that corporate taxes
paid should flow back to the community. This is also double edged because then other industries
should also contribute directly to the communities where they are located. And this is not normally
the case. Certainly, a local community shall have a fair and reasonable share of the profits and
benefits from a mining operation and that has often historically not been the case but there the
balance between local and national interests must be finetuned in order to make all stakeholders
content.
In Finland there is at present a proposal in parliament which introduces a new holistic view trying to
include a wider range of aspects into the permitting process than today. Not only the economics of
the proposed mine itself and its environmental impacts are to be measured but also the socio-
economic effects. This will be an entirely new approach and it has spurred intensive discussion in
Finland: While it is clear the approach will give landowners opponents to exploration and mining
projects more influence it has also opened questions such as: Will the permitting process get overly
difficult and how will it affect the willingness to invest? It is recommended that this idea should be
studied in more detail by Estonia. Either to avoid this route or to benefit from the work already done.
A study, commissioned by the Finnish Ministry in charge of the development of a new mining
legislation, will be completed in the end of May and should be of particular interest also to Estonia.
The permitting process should be transparent and predictable provided all information and required
studies have been made and all regulations and protocols been followed by the applicant. In Sweden,
for example, the permitting process, sometimes involves multiple appeals, can last as long as 10
years only in the end to obtain a rejection of the application. Such cases have contributed to a
deteriorated investment climate in Sweden as perceived by international investors.
It seems as if it is important to create a situation where the positives of a mining industry and its
potential problems are handled by two separate authorities, one proponent and one opponent in
order to have both aspects clearly highlighted. Although outside the scope of this study we have
noted that in countries where the permitting process is handled by an environmental agency (in
Poland for example) there is a risk that the future of the mining industry is curtailed when compared
to other countries where environmental and social aspects are handled by one agency separate from
an agency in charge of economic and employment aspects.
Time frames, fees, royalties
Time frames
Some countries among those studied have in their legislation set maximum response times for the
authorities responsible for the various steps in the permitting process for exploration and mining
licenses. Depending on which step of the process the times are set in weeks or days. It seems
however as if this does not always guarantee that the handling of an application is swift and correct.
36
In a recent case in Sweden a regional Land and Environmental court several times requested the
concerned regional authority to hand in their mandatory response and comments to an application
within a time limit set by the court. Nothing happened and as there are no sanctions against the
regional authority nothing further could be done but to wait and the process was delayed 8 months.
Instead of just over one year the initial part of the environmental permitting lasted 2 years.
In Queensland the time spent by the authority responsible for permitting is continuously publicly
presented in order to put some pressure on the agency.
It seems as if the most important action to avoid delays and appeals is to make sure that all
stakeholders are part of the permitting process already from the beginning and are given required
and necessary information at an early stage. This is a fairly basic observation but still difficult to
transform into a smooth process. It is certainly important for an applicant to get permits and
responses in as short a time period as possible, but no doubt a predictable process, at least in terms
of its time frames, without surprises and unforeseen delays is more important to an investor.
Fees and royalties
The contribution to Estonia from mining of metals and minerals from its underground consists of two
major parts:
The element itself, which is indestructible and can be recycled infinitely.
The mineral rent created when mining and beneficiating the metal.
The purpose of the fiscal regime is to capture a suitable part of the mineral rent for the benefit of all
Estonians while allowing the investor to retain a share big enough to create an economic incentive to
make an investment. The principal instruments theoretically available to governments to address the
general objectives of a fiscal regime for the mining industry are:
Mining royalties – a percentage of production or gross revenue.
Income or profit-based taxes – mainly corporate income tax.
Mineral rent tax – taxes that target profits in excess of those generally required to attract
investments.
As there is no corporate tax the two other possibilities are the ones open to Estonia.
A mining royalty is strictly speaking not a tax but a compensation for minerals extracted owned by
somebody else, whether a private owner or state. Ad valorem royalties are most widely used. An ad
valorem royalty is transparent and easy to administer and are well known to investors. This would be
a non-controversial alternative for Estonia but a profit-based system or a mineral rent tax, could be
an alternative which should be evaluated in detail. Such taxes are only used by a few countries and
hence there are only limited experiences of its use and effects. One of the most important reasons
why the royalty system has been dominating is the ease by which it is operated. There is no need for
a sophisticated tax authority which can control that the profit and loss statements of a mining
company gives a fair picture to the company's competitiveness and profitability. In many mineral rich
countries primarily among the emerging economies this is not the case and a royalty regime is often
the only realistic alternative.
The approach that is most appropriate as the basis for determining a royalty regime is one that is
transparent, easily monitored, provides an appropriate level of return, is stable and meets other
administrative and parameters which the national mineral policy sets. It is not been within our scope
37
to suggest taxation regime. If a royalty regime is chosen it is important to consider the two variables,
royalty base and royalty rate, together when comparing and choosing royalty regime.
In addition to royalties, administrative fees for exploration and mining permits are levied by most
jurisdictions to cover costs incurred by regulators when administrating permits and overseeing the
regulatory regime. In addition, the fees should cover costs to make sure that exploration and mining
is carried out effectively, continuously and sustainably.
Like mineral legislations mineral tax regimes of mineral rich countries are converging and constantly
changing to be competitive. It will hence be necessary for Estonia to be able to adjust and revise the
fiscal regime when market and other conditions change in the future.
Tendering processes
The first come first served principle is still the one most generally employed around the world when
giving permits for exploration for non-fuel minerals. This system is usually linked to a preferential
treatment when applying for a mining permit, provided certain conditions are fulfilled, to exploit a
deposit which has been discovered during the exploration phase. For oil and gas an auction system
has been successfully employed for many years and in many countries. There are two main
differences between metal mining and petroleum exploration:
An oil field is often of much larger economic importance than a metal deposit and it is hence
possible to justify the higher cost of an auction compared to first come first served model.
The geological site information necessary to make an area sufficiently interesting for
companies to participate in a bidding process is in general lower for petroleum resources
than metallic minerals. The cost of identifying a potentially interesting area for bidding is
hence higher compared to the future economic gains for a mineral deposit than for an oil
field.
In spite of these difficulties to organize a successful auction for minerals, the interest globally has
been growing in the past decade and it seems as if it continues to develop. India, for example has
introduced legislation requiring auctions to be held for several reasons one interestingly being to
avoid corruption (see Appendix). The experiences in India are mixed and they emphasize the need to
develop the tendering process carefully to avoid misusages.
An auction process is not the solution to all problems. In Portugal the possibility to auction
particularly interesting mineral deposits has been in place for many years but so far no such auction
has been held, mainly because the entire mineral legislation is being reworked and not yet in place.
In Hungary a complicated auction mechanism has not managed to attract any bidders for deposits
which have been put out to tender, possibly as the general political attitudes towards mining have
been relatively negative. In Australia a change to an auctioning system was considered in the early
2000s but for various reasons these plans were abandoned and did never materialise. One of the
main reasons being that there was only a limited number of deposits with sufficient geological data
and hence high enough value to justify the expense of a bidding process. In Lithuania the first tender
for amber in 2016 was not successful due to lack of participants.
In no country that we know of has the environmental permitting process and how it is run been part
of the bidding process.
38
Hungary highlights how important it is to have a simple and predictable process both for the tender
itself but also in the following permitting process both for exploitation and environmental permits. If
the bidders cannot, before they hand in their tenders, make a reasonable estimate of the
environmental demands for the mining operation and the time necessary to obtain these permits,
the risks might be perceived too big to submit a bid at all. To guarantee environmental and
exploitation permits in advance of the bidding process would not be recommended. An alternative
would be to do an environmental impact assessment before the tender process starts which would
increase the costs to government and there is also a risk that the permit obtained would not fit the
final mining process selected by the winning tender.
The experiences from these countries underline the most important conditions for a successful
auction:
Sufficient geological information is available.
The process is transparent and objective.
There is a number of competing bidders.
An auctioning process must be designed carefully to make it attractive and at the same time not too
costly and time consuming to hinder development of suitable deposits. The objectives of the auction
must be clearly defined as for example: maximizing long-term rent, generating short term cash,
develop infrastructure, foster downstream value addition, create employment etc. The bidders
should meet with certain predetermined minimum requirements as exploration and mining
experience, financial capacity, providing economic guarantees etc.
The biddable factors should be very carefully selected and clearly spelled out as well as the criteria to
evaluate the bids upon. In Finland a combination of three factors has been used:
Cash payment up-front.
Work plans and financial and technical commitment and capability for executing a successful
exploration program.
Royalty system including royalty rate and base.
In the Finnish case the second point has been given priority when evaluating bids. It has been the
government's main goal to make sure that interesting deposits are brought forward as soon as
possible and with the best available technology and skills. The up-front payment is to cover the
exploration costs which the previous owner (in Finland GTK or the state) has had in order to find and
delineate the deposit. In Estonia where the auction is primarily to be used for the exploitation phase
of a mining project other criteria obviously have to be chosen. These can include for example the
speed at which the deposit is developed and certainly also down-stream value addition in further
processing after the initial mining step. The key is to set transparent rules for evaluating tenders in
advance of the tender process starts so bidders can focus on what government finds important.
In-country value addition is in focus of many governments in particular among emerging economies.
The historical examples from Finland and Sweden show how important the mining sector can be for
national economic and social development. At the same time, it is important to note that Sweden
together with other industrialised countries such as Canada and Australia export much of its mineral
resources without much value addition. The benefits of value addition must be carefully studied for
each specific country and mineral in order to avoid value addition turned into value destruction. This
could be the case if the mine stage operation is competitive and profitable but the value addition
step is not.
39
Recently more focus has been on the possibility to create horizontal linkages and develop upstream
capital goods and service industries. Again, Sweden and Finland are examples of globally leading
suppliers of mining equipment and technologies to study. The possibility to create a cluster around a
mine, including research, training, suppliers of goods and services and possibly customers for the
minerals mined should be carefully examined.
There are other areas than exploration such as obtaining wave lengths bands for mobile
telecommunications where auctioning models have been frequently, innovatively and successfully
used. Such cases could be useful to study in addition to experiences from other countries auctioning
mineral licenses. There are commercial operators organising tender processes with considerable
experiences which could be useful.
In the Estonian case we recommend a careful evaluation of the potential to continue to develop
deposits by the Geological Survey, at a reasonable cost to society, which are suitable for a tendering
process. It is obvious that the rare earth potential in the phosphorites could attract great interest but
the potential for economic gains and the inherent geological risks should be weighed against each
other to make sure that the state does not take on costs without obtaining later appropriate gains to
give finally an overall positive outcome.
State participation
State ownership as a means to secure income from mining projects and companies is most
frequently used in developing countries where the state's capacity to ensure full compliance with
mining and tax regulations is limited due to lack of resources whether experienced staff, transport
facilities or other factors. It has however also been used in many European countries during earlier
economic development phases. There are still many successful state-owned mining companies
operating in many countries. Swedish LKAB was nationalised in steps beginning in 1907 in completely
different economic and political situation than today, Polish Copper started during the era of planned
economy in the early 1960s and Finnish Outokumpu was set up before the second world war when
there was acute lack of capital in the Finnish economy. Although these companies were founded in
times when economic and political conditions were radically different than today, they are all
thriving and playing important roles in particular in regional economic and social development in
both Sweden and Finland. Swedish LKAB is an economic anchor in the northern part of Sweden and
seen by many as a guarantor of continuity and sustainability in spite of its operation being based on a
non-renewable resource. The engagement in the relocation of the towns of Kiruna and
Gällivare/Malmberget after more than 100 years of mining are examples of the societal responsibility
shown by LKAB. At the same time, the company is operated as a normal publicly listed entity with
outside directors and full economic reporting.
At present there are state engagement in the European mining sector mainly in order to spur
innovation and to secure access to metals necessary for the transition to a fossil free energy future.
Some of these efforts are channelled through the EU's innovation initiatives, other such as the
Finnish Minerals Group are also nationally funded. The Finnish Minerals Group is an interesting
object for further study as an example of an active way of engaging in and supporting the mining
sector by the Finnish government. This group of companies includes the bankrupt Talvivaara nickel
mine (nowadays Terra fame) taken over by government to avoid capital destruction and now again
profitable, projects to mine lithium (Keliber) and also other steps in the battery value chain. The
company is a vehicle to support innovations and to support a battery industry in Finland and not only
a commercial venture.
40
It is clear that all shareholdings directly into a company also brings responsibilities even if acquired
without cash costs as a free-carried interest. What happens if the performance of a company is poor
and a rescue operation has to be made? A government might have to pump in fresh capital, even if
the first shares were free carried, in order to save jobs and perhaps also the environment in
particular as political pressures to do so might mount in election times.
One additional aspect of state participation in a mining project, which should not be overlooked is
the stability, economic power and long-term views which a government can contribute. Under
certain conditions public participation in the exploitation of a country's mineral patrimony can be
seen as a guarantee for an appropriate and sustainable way of operation.
Our recommendation is to look at the Nordic and possibly Japanese (JOGMEC) experiences of
government activities in the exploration and mining industries. When doing so the important
differences in Estonian history and scale of economy and mineral prospectivity compared to these
countries, must be taken into account. There are several examples of how governments can engage
through ownership and in other ways, in its national mining sector, to balance risk of commercial
short-term profit motives becoming too important.
Development of a suitable legislation
The process of developing a suitable mining legislation will take considerable time and necessitates
careful planning in particular in order to involve all relevant stakeholders. The purpose of such
involvement is to create a common understanding, interest and commitment to the future legislation
and to the mining projects this legislation hopefully will spur. In parallel a communication plan should
be established in order to build interest and awareness also among the wider public.
All relevant national, regional and local stakeholders from various interest groups should be involved
and engaged, such as government and its agencies whether proponents or opponents of mining, the
mining industry and its organisation, trade unions, civil society groups, academia, other businesses,
local authorities and parlamentarians, media, and not least colleagues from responsible authorities in
the Nordic countries which have been dealing with similar issues, etc. The initial steps would be to
map all the stakeholders to engage with and to develop a time plan to do so in a suitable way. In
Sweden a broad and relatively successful such process was started in the early 2010s when a new
mineral strategy was developed. In recent years discussions are underway about a revised mineral
legislation but the participation is not as wide as at that time. The lessons learnt are doubtless that
the time spent on such efforts to involve and engage a broad selection of interests pays off in the
long run even if it might take an additional year before a new legislation can be completed.
Without repeating the points raised earlier and the recommendations made it should be underlined
that there are several processes to create new mining legislations on-going at present also in the
close neighbourhood of Estonia. The situation and developments in both Finland, Sweden and
Norway could serve both as important sources of inspiration and signals of warning for the Estonian
process.
41
Appendix
Mineral Auction Regime in India: Challenges and Future Outlook
The Mineral Laws (Amendment) Bill, 2020
The Mines and Minerals (Development and Regulation) Act, MMDR Act regulates the overall Mining
Sector in India. The MMDR Act regulates the overall Mining Sector in India. The MMDR Amendment
Act, 2015 has ushered in the regime of transparent and non-discretionary grant of mineral
concessions and thereafter all the concessions of major minerals are granted through auction.
The court observed that a first-come, first-served process to allocate natural resources was
unconstitutional as it violated the principle of equal opportunity. The court further averred that
"While transferring or alienating natural resources, the State is duty-bound to adopt such method
that which serves three essential causes transparency, equal opportunity for all those interested in
acquiring that asset and protection of the public interest.
The Court’s observation reads: "Natural resources belong to the people but the State legally owns
them on behalf of its people and from that point of view natural resources are considered as national
assets. However, as they constitute public property/national asset, while distributing natural
resources, the State is bound to act in consonance with the principles of equality and public trust and
ensure that no action is taken which may be detrimental to public interest.”
The Court added that auction was the best way to allocate natural resources, be it oil and gas,
spectrum, minerals and coal. Auction thus came to be a benchmark method for allocation of natural
resources.
This Court has repeatedly held that wherever a contract is to be awarded or a licence is to be given,
the public authority must adopt a transparent and fair method for making selections so that all
eligible persons get a fair opportunity of competition. To put it differently, the State and its agencies
must always adopt a rational method for disposal of public property and no attempt should be made
to scuttle the claim of worthy applicants.
A duly publicised auction conducted fairly and impartially is perhaps the best method for discharging
this burden and the methods like first-come-first-served when used for alienation of natural
resources/public property are likely to be misused by unscrupulous people who are only interested in
garnering maximum financial benefit and have no respect for the constitutional ethos and values.
The conclusions that could be drawn from all these decisions are:
(i) It is not obligatory, constitutionally or otherwise, that a natural resource (other than spectrum)
must be disposed of or alienated or allocated only through an auction or through competitive
bidding;
(ii) Where the distribution, allocation, alienation or disposal of a natural resource is to a private party
for a commercial pursuit of maximising profits, then an auction is a more preferable method of such
allotment;
(iii) A decision to not auction a natural resource is liable to challenge and subject to restricted and
limited judicial review under Article 14 of the Constitution;
(iv) A decision to not auction a natural resource and sacrifice maximisation of revenues might be
justifiable if the decision is taken, inter alia, for the social good or the public good or the common
good;
(v) Unless the alienation or disposal of a natural resource is for the common good or a social or
welfare purpose, it cannot be dissipated in favour of a private entrepreneur virtually free of cost or
for a consideration not commensurate with its worth without attracting Article 14 and Article 39(b)
of the Constitution.
42
The decision of the State of Goa was justified in not adopting the auction route for the grant of
mining leases and simply granting a second renewal. For a better understanding of this issue, it
would be worthwhile to again refer to the Goa Mineral Policy, the report of the EAC, the Grant of
Mining Leases Policy and the decision of the Bombay High Court, which documents were relied upon
by the learned Additional Solicitor General. The matter is still sub judicious in apex court.
Acknowledging that “the auction regime had not achieved the desired success”, the committee, said
"the focus must shift from revenue maximisation to production maximisation". It also recommended
that production rate be given high weightage for auction of mineral concessions. The lapsing of these
merchant mines, 334 in total and 44 working ones in particular, could cause a significant disruption
to domestic supply of iron ore, manganese and chromite. To avoid this, the committee has suggested
that the leases be auctioned by January 31, 2020—two months before they lapse.
This should also mean that the Government will get an increased share from the mining sector.
Unlike in the 1957 Act, there would be no renewal of any mining concession. The tenure of the
mineral concession has been increased from the existing 30 years to 50 years. Thereafter, the Mining
Lease would be put up for auction and not for renewal as in the earlier system.
Excerpts from article in Mineral Economics by Dr Pradeep Kumar Jain
For full article please see:
https://link-springer-com.proxy.lib.ltu.se/content/pdf/10.1007/s13563-020-00244-1.pdf
43
Sources
Interviews
Ferenc Madai, Hungary
Riikka Aaltonen, Finland
Luis Martins, Portugal
Eva Liedholm Johnsson, Sweden
Saul Kavonic, Australia
General
Ali, S.A., Giurco, D., Arndt, N., Nickless, E., Brown, G., Demetriades, A., Durrheim, R.,Enriquez, M.A.,
Kinnaird, J., Littleboy, A., Meinert, L.D., Oberhänsli, R., Salem, J., Schodde, R., Schneider, G., Vidal, O.,
Yakovleva, N., 2017. Mineral supply for sustainable development requires resource governance.
Nature 543, pp. 367–372.
Baker McKenzie Global Mining Guide 2020.
https://resourcehub.bakermckenzie.com/en/resources/global-mining-guide.
Cooney, J. (2017) Reflections on the 20th anniversary of the term ‘social licence’ in Journal of Energy
&Natural Resources Law, 35:2, 197-200, DOI:10.1080/02646811.2016.1269472.
Guj, Pietro (2012) Mineral royalties and other mining-specific taxes, International Mining for
Development Centre. http://im4dc.org/wp-content/uploads/2012a/01/UWA_1698_Paper-01_-
Mineral-royalties-other-mining-specific-taxes.pdf.
Hojem, P. (2015) Mining in the Nordic Countries. A comparative review of legislation and taxation.
Köpenhamn, Nordic Council of Ministers.
Johnson, Ericsson & Löf (2016). Tillstånd och miljöprövning för att öppna gruvor – en internationell
utblick. PM 2016:05. Myndigheten för tillväxtpolitiska utvärderingar och analyser. Östersund.
https://www.tillvaxtanalys.se/download/18.62dd45451715a00666f1ff87/1586366202694/pm_2016
_05_Tillst%C3%A5nd%20och%20milj%C3%B6pr%C3%B6vning%20f%C3%B6r%20att%20%C3%B6ppna
%20gruvor.pdf.
Liedholm Johnson, E., Ericsson, M. (2015) State ownership and control of minerals and mines in
Sweden and Finland in Mineral Economics, DOI 10.1007/s13563-015-0063-2. Springer.
MIN-GUIDE – D1.3 The MIN-GUIDE Policy Guide: Guidance for EU and MS mineral policy and
legislation
https://ec.europa.eu/research/participants/documents/downloadPublic?documentIds=080166e5bf9
b150c&appId=PPGMS
MinPol and partners, Study – Legal framework for mineral extraction and permitting procedures for
exploration and exploitation in the EU 2017.
https://op.europa.eu/en/publication-detail/-/publication/18c19395-6dbf-11e7-b2f2-
01aa75ed71a1/language-en
Williams, J.P. (2012) Global Trends and Tribulations in Mining Regulation in Journal of Energy &
Natural Resources Law,30:4, 391-422, DOI:10.1080/02646811.2012.11435304.
44
Sweden
Legislative Bill (1989) Ny minerallagstiftning mm. Regeringens proposition 1988/89:92.
Ministry of Enterprise Energy and Communications (2013) Sweden’s Minerals Strategy, Sweden.
http://www.bergsstaten.se
(Bergsstaten/Mining Inspectorate of Sweden).
http://www.lagrummet.se
(Portal for Swedish public administration legal information).
Finland
Legislative Bill (2009) Regeringens proposition med förslag till gruvlag och vissa lagar som har
samband med den. RP 273/2009, Finland.
Ministry of Employment and the Economy (2010) Finlands mineralstrategi, Finland
http://mineraraalistrategia.fi
(Finnish mineral strategy)
Ministry of Employment and the Economy (2013) Making Finland a leader in the sustainable
extractive industry – action plan. Publications of the Ministry of Employment and the Economy
Concern 22/2013.
Ministry of Employment and the Economy (2011) Mining Act, unofficial translation.
Pokki J. (2016) Finland: Mineral Policy. In: Tiess G., Majumder T., Cameron P. (eds) Encyclopedia of
Mineral and Energy Policy. Springer, Berlin, Heidelberg. https://doi.org/10.1007/978-3-642-40871-
7_45-2
Rinne, Tomi; Simonen, Ari (2020-09-23) Termination and after-care measures covered by collateral
under the Mining Act
https://julkaisut.valtioneuvosto.fi/handle/10024/162444
(not directly related to our topic but interesting example of work initiated by Finnish government)
Vihervuori, Pekka (2019-06-17) Assessment of the effectiveness of legislation on mining operations
https://julkaisut.valtioneuvosto.fi/handle/10024/161756
http://www.finlex.fi
(Database of Finnish laws)
https://www.finlex.fi/fi/laki/ajantasa/1940/19400174
(Law on tenders for certain mineral deposits)
Poland
MINLEC Country Report Poland
https://rmis.jrc.ec.europa.eu/uploads/cprofiles/MINLEX_CountryReport_PL.pdf
“Daniny i Podatki płacone przez górnictwo w Polsce” in Wspolne Sprawy, Nr 3 (263), March 2015
(Biuletyn Zarządu Głównego Stowarzyszenia inżynierów i techników górnictwa).
45
“Podatki i opłaty w polskim górnictwie” (Taxes and fees in Polish mining industry) in PRZEGLĄD
GÓRNICZY, Issue 5/2016, accessed 1 June 2020.
Infrastructure, Environment Geology II, No 212, April 20, 2015.
https://www.mos.gov.pl/srodowisko/geologia/informacje-dla-przedsiebiorcow/
(Archive of the Ministry of the Environment)
https://www.mos.gov.pl/srodowisko/geologia/informacja-geologiczna/
(Ministry of the Environment, geological information)
http://www.mf.gov.pl/en/ministry-of-finance/news/about-mf
Ministry of Finance (Ministerstwo Finansów)
http://www.mf.gov.pl/pl/ministerstwo-finansow/dzialalnosc/baza-wiedzy#
(Ministry of Finance)
http://opis.sejm.gov.pl/en/index.php
Polish Parliament (Sejm)
http://isap.sejm.gov.pl/KeyWordServlet?viewName=thasG&passName=geologiczne+prawo
(Portal for Polish public administration legal information).
• Prawo geologiczne i górnicze 2011 (Mining Act)
• Prawo ochrony środowiska 2001 (Environment Protection Act)
• Ustawa o odpadach wydobywczych 2008 (Extraction Waste Act)
• Ustawa o udostępnianiu informacji o środowisku i jego ochronie, udziale społeczeństwa w
ochronie środowiska oraz o ocenach oddziaływania na środowisko 2008 (Act on Disclosure of
Environmental Information and its Protection, Public Participation in Environment Protection,
and on Environmental Impact Assessment).
Niec, M., Galos, K., Szamalek, K. (2014) Main challenges of mineral resources policy in Poland.
Resources Policy 42, pp. 93-103.
Polityki energetycznej Polski do 2030 roku, Uchwala Rady Ministrów nr 202/2009.
T. Smakowski, S. Speczik, Kierunki polityki surowcowej Polski, „Gospodarka Surowcami Mineralnymi”,
2008, t. 24, z. 4/4, s. 383 (s. 381-394); J. Hausner (red.) Polityka surowcowa Polski, rzecz o tym czego
nie ma a jest bardzo potrzebne, Wyd. Fundacja Gospodarki i Administracji Publicznej, Kraków 2015.
Hungary
MINLEX_Country Report Hungary
https://rmis.jrc.ec.europa.eu/uploads/cprofiles/MINLEX_CountryReport_HU.pdf
Hungarian Mining and Geological Survey (MBFSZ)
https://mbfsz.gov
Closed areas
https://mbfsz.gov.hu/en/closed-areas
Concession tenders
https://mbfsz.gov.hu/en/concession-procedure
46
Hungarian Official Journal no. 66 2018
Communique of the Hungarian Mining and Geological Survey defining the set of concession-obliged
minerals.
Portugal
MINLEX Country Report Portugal
https://rmis.jrc.ec.europa.eu/uploads/cprofiles/MINLEX_CountryReport_PT.pdf
Direção Geral de Energia e Geologia (DGEG)
https://www.dgeg.gov.pt/pt/areas-setoriais/geologia/depositos-minerais-minas/
(Portuguese Geological Survey)
M. Santos Vitor, Mining in Portugal: overview
https://content.next.westlaw.com/Document/I95e1f2bb3ad811e9adfea82903531a62/View/FullText
.html?productData=categoryPageUrl%3aHome%2fPracticalLawGlobal%2fCountries%2fPortugal&Sco
pedPageUrl=Home%2fPracticalLawGlobal%2fCountries%2fPortugal&navId=F1498BAFB989C708F3A0
F3D6B7FBFEB4&transitionType=CategoryPageItem&contextData=(sc.Default)&firstPage=true
Portugal to launch tender of lithium exploration licenses this year Commodities News
September 25, 2018
https://www.reuters.com/article/us-portugal-lithium-exclusive-idUSKCN1M5199
Overview of the mineral resources policy in Portugal (2014)
https://www.cobalt-fp7.eu/pdf/2014%20-%20regional%20dialogue%201/presentations/2-DGEG.pdf
Ontario
Ontario government. https://www.fin.gov.on.ca/en/tax/cit/index.html.
Natural Resources Canada. https://www.nrcan.gc.ca/home.
(responsible federal ministry)
Natural Resources Canada (no year) Provincial and Territorial Mining Taxes and Royalties Deduction.
https://www.nrcan.gc.ca/our-natural-resources/minerals-mining/mining/taxation/mining-taxation-
canada/mining-specific-tax-provisions/8892#a1.
Government of Canada, PDAC, The Mining Association of Canada, Canadian Aboriginal Minerals
Association (2013) Exploration and Mining Guide for Aboriginal Communities.
Ministry of Northern Development and Mines (2008) A Practitioner’s Guide to Planning for and
Permitting a Mineral Development Project in Ontario.
Ministry of Northern Development and Mines (2009) One Window Coordination Process for Mineral
Development Projects in Ontario.
Ministry of Northern Development and Mines (undated) Project Definition Template for Advanced
Exploration and Mine Development Projects A guide to the information needed to plan for permitting
and approval of a mineral sector project in Ontario.
Ministry of Northern Development and Mines (undated) Regulatory Requirements Outside of MNDM
Affecting Mineral Exploration and Development Activities.
47
http://www.mndm.gov.on.ca
(Ministry of Northern Development and Mines)
www.e-laws.gov.on.ca
(Legislation Province of Ontario)
Queensland
Mineral resources Act 1989, Mineral Resources Regulation 2013:
https://www.legislation.qld.gov.au/view/pdf/inforce/current/sl-2013-0170.
Australian Government, Australian Taxation Office, Company tax rates,
https://www.ato.gov.au/Rates/Company-tax/.
Queensland Government, Business Queensland, https://www.business.qld.gov.au.
Queensland Government (2020) Environmentally relevant activities Summary of fees for
environmentally relevant activities (ERAs)
https://environment.des.qld.gov.au/__data/assets/pdf_file/0025/88702/era-is-summary-annual-
fees.pdf.
Guj, Pietro (2015) Outline of the Australian Mining Taxation Regime.
https://www.imf.org/external/np/seminars/eng/2015/natrestax/pdf/guj.pdf.
PwC (2019) Worldwide Tax Summaries – Australia. https://taxsummaries.pwc.com/australia.
State participation
Johnson E., Ericsson M. State ownership and control of minerals and mines in Sweden and Finland,
Mineral Economics vol 28 no 1-2 pp 23-38 2015.
Radetzki, Marian State Mineral Enterprises – AN investigation into their impact on international
mineral markets, Resources for the Future 1985.
World Bank Raw Materials Group (2011). Overview of State Ownership in the Global Minerals
Industry. Long Term Trends and Future. Extractive Industries for Development Series #20.
Japan Oil, Gas and Metals National Corporation (JOGMEC)
http://www.jogmec.go.jp/english/
African state participation in various countries
https://www.lexafrica.com/wp-content/uploads/2019/02/LEX-Africa-MINING-GUIDE-DIGITAL.pdf
Proposals for Estonia
African Minerals Development Centre, A country mining vision guidebook – Domesticating the Africa
Mining Vision, no year pp. 37-38
UNECA United Nations Economic Commission for Africa, Minerals and Africa's development: The
International Study Group Report on Africa's mineral regimes, 2011, pp. 1-3 and Appendix L pp. 206-
210.
48
Fraser Institute, Annual Survey of Mining Companies 2020
https://www.fraserinstitute.org/studies/annual-survey-of-mining-companies-2020
Jain, PK, Mineral Auction Regime in India: Challenges and Future Outlook
Mineral Economics https://doi.org/10.1007/s13563-020-00244-1
“Sectoral Licensing Studies: Mining Sector” was prepared under the Global Business Operations
Product Line by consultant Charles Krakoff
MIN-GUIDE Minerals policy guidance for Europe (2018)
https://ec.europa.eu/research/participants/documents/downloadPublic?documentIds=080166e5bf9
b150c&appId=PPGMS
Min Pol and partners, Study – Legal framework for mineral extraction and permitting procedures for
exploration and exploitation in the EU 2017, op. cit. p. 498.
Vijay Kumar, S and R K Sinha. 2020. Mineral Auctions in India: Winner’s Curse or Owner’s Pride? TERI
Discussion Paper. New Delhi: The Energy and Resources Institute.
S Vijay Kumar, Distinguished Fellow, TERI Email:
[email protected] R K Sinha, former
Controller-General, Indian Bureau of Mines Email:
[email protected]
A Strategic Blueprint for Queensland’s North West Minerals Province: supporting strong and
prosperous regional communities
State of Queensland, July 2017.
https://www.statedevelopment.qld.gov.au/__data/assets/pdf_file/0009/12231/nwmp-strategic-
blueprint.pdf
Assessment of the effectiveness of legislation on mining operations
Publications of the Ministry of Economic Affairs and Employment Enterprises • 49/201
https://julkaisut.valtioneuvosto.fi/handle/10024/161756
Industry commission mining and minerals processing in australia volume 3: issues in detail
Report No. 7 25 February 1991 Australian Government Publishing Service Canberra
https://www.pc.gov.au/inquiries/completed/mining/07miningv3.pdf
Australia Government Productivity Commission Inquiry Report Mineral and Energy Resource
Exploration No. 65, 27 September 2013
https://www.pc.gov.au/inquiries/completed/resource-exploration/report/resource-exploration.pdf
49