dokumendiregister.ee
Väljaminev kiriAvalik

Väljaminev kiri

Konkurentsiamet · 1. aprill 2019
Viit
4-16/2019-025-2
Registreeritud
1. aprill 2019
Dokumendi liik
Väljaminev kiri
Saabumis/saatmisviis
käsipost
Funktsioon
4 Rahvusvaheline koostöö
Sari
4-16 Energeetikavaldkonna väliskirjavahetus
Toimik
4-16/2019
Vastutaja
Tiina Maldre (Konkurentsiamet, Regulatsiooniteenistus, Energeetika- ja postiosakond)

Failid

Sisu (failidest)

Saatja: Tiina Maldre </o=JM/ou=Exchange Administrative Group (FYDIBOHF23SPDLT)/cn=Recipients/cn=6cc804a2a4344e75b160b38f1d7c2351-Tiina Maldre> Saaja: '[email protected]' Teema: RE: [VÄLJAST] Question - SAIFI / SAIDI calculation Dear Martin, I'm trying to answer your question. The calculation logic of SAIDI is as follows: the total duration of the interruption of all contractual customers who have experienced an interruption of more than 3 minutes are summarized and divided by a fixed number points of consumption (the number of points of consumption is fixed at the end of last year). Interruptions caused by failure of the transmission network, failure of the internal electrical installation, failure of the consumer device shall be filtered out. The SAIFI calculation logic is as follows: the total number of the interruption of all contract customers who have experienced an interruption of more than 3 minutes are summarized and divided by the number of fixed points of consumption (the number of consumption points is fixed at the end of last year). Interruptions caused by failure of the transmission network, failure of the internal electrical installation, failure of the consumer device shall be filtered out. Elektrilevi OÜ calculates SAIDI and SAIFI only with contractual customers who have experienced interruptions over 3 minutes which are not caused by TSO interruptions, inner interruptions and interruptions in customer devices. In other words, we do not take into account customers of other DSO’s. Kind regards Tiina Maldre Adviser of Department of Energy and Postal Communications Regulatory Division +372 667 2573 | www.konkurentsiamet.ee <http://www.konkurentsiamet.ee/> | Tatari 39, Tallinn 10134 ESTONIA Estonian Competition Authority From: [email protected] [mailto:[email protected]] Sent: Tuesday, March 26, 2019 1:15 PM To: Konkurentsiamet <[email protected]> Subject: [VÄLJAST] Question - SAIFI / SAIDI calculation Dear Sir / Madam, We are compiling a study focused on electricity supply quality (particularly in the meaning of distribution continuity) and trying to understand what is behind SAIFI / SAIDI values presented in various countries. We have analysed several valuable documents / data files available on your web page, but still are not sure about one important issue. Could you please reveal how SAIFI / SAIDI is calculated for your distribution system operators? We mean whether in case of an interruption also interrupted sites / connections of lower voltage levels (or connected local distributors) are counted into the value of interrupted customers caused by this interruption or not. This is important particularly in case of Elektrilevi OÜ supplying several cities operated by separate distribution system operators. We would be happy for any feedback. Best regards, Martin Továrek Bořanovická 897 250 65 Bašť The Czech Republic +420 721 183 325
Allikas: Konkurentsiamet dokumendiregister →