dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Majandus- ja Kommunikatsiooniministeerium
Sissetulev kiriAvalik

Kinnituskiri

Majandus- ja Kommunikatsiooniministeerium · 10. veebruar 2021
Viit
25-1/2021/844-1
Registreeritud
10. veebruar 2021
Dokumendi liik
Sissetulev kiri
Adressaat
Transpordiamet
Saabumis/saatmisviis
DVK
Funktsioon
25 Transpordi arengu korraldamine
Sari
25-1 Transpordi arendamisega seotud dokumendid ja kirjavahetus (Arhiiviväärtuslik)
Toimik
25-1/2021
Vastutaja
Juku Paulus (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Transpordi valdkond)
Lahendamise tähtaeg
12. märts 2021

Failid

  • 📎1.1-6213456-1 09.02.2021 Väljaminev kiri.asice1557 KB

Sisu (failidest)

CERTIFICATION OF THE MEMBER STATE * (applicable only for ASR and for beneficiaries established in the European Union) Name Position Entity Telephone Nº E-mail In compliance with Article II.23.1 ( or SESAR FPA II.23.1b) of the GA, it is certified that the information provided by the following Beneficiary( ies ) in the ASR is full, reliable and true. Estonian Road Administration Date and signature Stamp ( optional) * In line with the terms of Art. 22 of the CEF Regulation Indrek Gailan Majandus- ja Kommunikatsiooniministeerium [email protected] Meie 09.02.2021 nr 1.1-6/21/3456-1 Suur-Ameerika tn 1 10122, Tallinn, Harju maakond Riigi kinnituskiri projekti vahearuandele Austatud hr Gailan Seoses Tallinna ringtee „Dynamic traffic and truck parking management” projektiga peab Maanteeamet esitama eelmise perioodi (jaanuar 2020 kuni detsember 2020) vahearuande, mille üheks osaks on riigi kinnituskiri. Palume tutvuda vahearuande raporti ja selle lisadega ning seejärel Majandus- ja Kommunikatsiooniministeeriumi esindajal täita ja käsitsi allkirjastada kinnituskiri (dokument pealkirjaga „MS certification ASR_1”) ning saata originaaldokumendina tagasi. Juhime tähelepanu, et vahearuande perioodi ajal oli Transpordiamet veel moodustamata, mistõttu rahastuse saajaks on märgitud Maanteeamet (ingl k Estonian Road Administration). Lugupidamisega (allkirjastatud digitaalselt) Andres Urm juhataja taristu arendamise osakond Lisa: Report ASR_1, Request of further pre-financing payment_Estonian Road Administration ASR_1, Financial Annex ASR_1, MS certification ASR_1 Mari-Liis Sepp 58502984 [email protected] Valge 4 / 11413 Tallinn / 620 1200 / [email protected] / www.transpordiamet.ee Registrikood 70001490 ASR-2021-2018-EE-TM-0029-M- European Dynamic traffic and truck parking Commission Innovation and management Reporting period: 1 January 2020 - Networks Executive Agency (INEA) 31 December 2020 Connecting Europe Facility 1. INFORMATION ON THE ACTION Grant Agreement Nº INEA/CEF/TRAN/M2018/1767529 Action number 2018-EE-TM-0029-M Action title Dynamic traffic and truck parking management PCI (for energy and synergy only) Author of the report Name Mari-Liis Sepp Position Project manager Entity Estonian Road Administration Telephone Nº +372 5850 2984 E-mail [email protected] Reporting period: 1 January 2020 - 31 December 2020 2. INFORMATION ON THE PROGRESS OF THE ACTION (GA II.23.1.1.c or SESAR FPA II.23.1b.c) 2.1. Overall progress of the Action until the end of the previous reporting period Overall Planned dates (GA) Previous ASR dates Actual dates technical progress achieved at the end of Start End Start End Start End the previous reporting period (%)* 01/06/2019 31/12/2023 01/06/2019 31/12/2023 01/06/2019 31/12/2023 8.00 *Please explain how the percentage of the progress achieved has been estimated/calculated Calculated according to Annex III of the "Guidance for poor or partial completion": SUM(Technical Progress Per Activity Per Year * (GA EU Contribution Per Activity / Total GA EU Contribution)). Overview of progress since the start of the Action The overview should include a description of the actual progress of the Action and per activity since the start of the Action until at the end of the previous reporting period, referring to the main issues, milestones and events that affected the progress. Which activities started, were ongoing, complete? Activities 1 (project management), 2 (communication and dissemination), 3 (transport and ITS study), 4 (pilot implementation 1), 5 (pilot implementation 2) started in the reporting period (01/01/2020-31/12/2020) and were on-going. Activity 3 has completed as the final milestone – transport and ITS study final report – ended on 09/09/2020. Which milestones were planned to be complete and were finally completed? The following milestones have been finished: 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 2 Reporting period: 1 January 2020 - 31 December 2020 • Assessment of offers Transport and ITS study report planned date 01/01/2020; actual date 10/01/2020 • Contract signed Transport and ITS study report planned date 01/02/2020; actual date 23/01/2020 • Action Status Report (ASR) planned date 31/03/2020; actual date 17/02/2020 • Communication support materials planned date 31/05/2020; actual date 20/04/2020 • Transport and ITS study interim report planned date 01/06/2020; actual date 04/06/2020 • PM and SG joint meeting no 3 planned date 30/06/2020; actual date 17/09/2020 • Transport and ITS study final report planned date 01/09/2020; actual date 09/09/2020 • Publication of tender Pilot 1 (design) planned date 01/10/2020; actual date 22/10/2020 • Publication of tender Pilot 2 (design) planned date 01/10/2020; actual date 17/08/2020 • PM and SG joint meeting no 4 planned date 31/12/2020; actual date have not occurred • Assessment of offers Pilot 1 (design) planned date 31/12/2020; actual date 04/12/2020 • Delivery of the scoping decision and subsequent environmental permits planned date 31/12/2020; actual date 06/05/2020 • Assessment of offers Pilot 2 (design) planned date 31/12/2020; actual date 22/09/2020 • Contract signed Pilot 1 (design) planned date 31/01/2021; actual date 03/01/2021 • Contract signed Pilot 2 (design) planned date 31/01/2021; actual date 22/09/2020 Reasons for delays for milestones and/or activities if any and the impact for activity’s/Action’s end dates or other activities? PM and SG joint meeting no 3 was planned on 30/06/2020 but since the first PS and SG joint meeting was delayed others have also postponed and the actual date was 17/09/2020. PM and SG joint meeting no 4 was planned on 31/12/2020 but since the first PS and SG joint meeting was delayed others have also postponed to next reporting period. These delays have no impact for activity’s nor Action’s end dates or other activities. Some milestones actual dates were also early completed, for example, delivery of the scoping decision and subsequent environmental permits planned date 31/12/2020; actual date 06/05/2020. Any task not foreseen initially but needed to achieve the Action’s objectives/scope? After Transport and ITS study the beneficiary decided to divide Pilot 1 and 2 tenders into two: design and building process. This change is important so it will be easier to 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 3 Reporting period: 1 January 2020 - 31 December 2020 calculate the building cost and the works will be more percise in the tender. This decision will not interfere in the objectives and goals of the Action. During the reporting period the pilot 1 and 2 tender included design tender. The building tender and process will start in 2021 and will end as scheduled. 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 4 Reporting period: 1 January 2020 - 31 December 2020 2.2. Progress per activity Overall technical progress achieved Previous ASR Start/end Activity 1 Title Planned Start/End date (GA) Actual Start/End date until the end of the dates previous reporting period (%)* Project management 01/06/2019 31/12/2023 01/06/2019 31/12/2023 01/06/2019 31/12/2023 18.00 *Please explain how the percentage of the progress achieved has been estimated/calculated SUM(Technical Progress Per Activity Per Year * (GA EU Contribution Per Activity / Total GA EU Contribution)) Milestone Title1 Planned completion date (GA) Previous ASR date Actual completion date Reached (Y/N) no PM and SG joint meeting 1 30/06/2019 20/11/2019 20/11/2019 Yes No 1 Explanation for any deviation from planned completion date The project manager was hired in September 2019. There was not a project manager nor actual need to hold PM and SG joint meeting No 1 before that. PM and SG joint meeting 2 31/12/2019 30/04/2020 07/05/2020 Yes No 2 Explanation for any deviation from planned completion date 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 5 Reporting period: 1 January 2020 - 31 December 2020 The meeting was organised a week later due to the participants' schedule. PM and SG joint meeting 3 30/06/2020 30/09/2020 17/09/2020 Yes No 3 Explanation for any deviation from planned completion date The meeting was organised two weeks before due to the participants' schedule. PM and SG joint meeting 4 31/12/2020 31/12/2020 26/02/2021 No No 4 Explanation for any deviation from planned completion date The meeting was organised two months later due to the holidays and the amount of information to share at the meeting. PM and SG joint meeting 5 30/06/2021 30/06/2021 30/06/2021 No No 5 Explanation for any deviation from planned completion date PM and SG joint meeting 6 31/12/2021 31/12/2021 31/12/2021 No No 6 Explanation for any deviation from planned completion date PM and SG joint meeting 7 30/06/2022 30/06/2022 30/06/2022 No No 7 Explanation for any deviation from planned completion date PM and SG joint meeting 8 31/12/2022 31/12/2022 31/12/2022 No No 8 Explanation for any deviation from planned completion date PM and SG joint meeting 9 30/06/2023 30/06/2023 30/06/2023 No No 9 Explanation for any deviation from planned completion date 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 6 Reporting period: 1 January 2020 - 31 December 2020 PM and SG joint meeting 10 31/12/2023 31/12/2023 31/12/2023 No No 10 Explanation for any deviation from planned completion date 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 7 Reporting period: 1 January 2020 - 31 December 2020 Overall technical progress achieved Previous ASR Start/end Activity 2 Title Planned Start/End date (GA) Actual Start/End date until the end of the dates previous reporting period (%)* Communication and 01/06/2019 31/12/2023 01/06/2019 31/12/2023 01/06/2019 31/12/2023 25.00 dissemination *Please explain how the percentage of the progress achieved has been estimated/calculated SUM(Technical Progress Per Activity Per Year * (GA EU Contribution Per Activity / Total GA EU Contribution)) Milestone Title1 Planned completion date (GA) Previous ASR date Actual completion date Reached (Y/N) no Project opening press / 11 31/12/2019 20/11/2019 20/11/2019 Yes kick off meeting event Explanation for any deviation from planned completion date Actual completion date was before planned completition date. Project communication 12 31/10/2019 14/10/2019 14/10/2019 Yes plan Explanation for any deviation from planned completion date Actual completion date was before planned completition date. Communication support 13 31/05/2020 31/05/2020 20/04/2020 Yes materials 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 8 Reporting period: 1 January 2020 - 31 December 2020 Explanation for any deviation from planned completion date Actual completion date was before planned completition date. Project finalization press / 14 31/10/2023 31/10/2023 31/10/2023 No final meeting event Explanation for any deviation from planned completion date 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 9 Reporting period: 1 January 2020 - 31 December 2020 Overall technical progress achieved Previous ASR Start/end Activity 3 Title Planned Start/End date (GA) Actual Start/End date until the end of the dates previous reporting period (%)* Transport and ITS study for preparation of pilot 1 01/09/2019 01/09/2020 02/09/2019 31/01/2021 02/09/2019 09/09/2020 100.00 and 2 *Please explain how the percentage of the progress achieved has been estimated/calculated SUM(Technical Progress Per Activity Per Year * (GA EU Contribution Per Activity / Total GA EU Contribution)) Milestone Title1 Planned completion date (GA) Previous ASR date Actual completion date Reached (Y/N) no Publication of Tender 15 Transport and ITS study 01/11/2019 02/12/2019 02/12/2019 Yes report Explanation for any deviation from planned completion date Project manager was hired in September 2019 which was the reason the tender was published a month later. Assessment of offers 16 Transport and ITS study 01/01/2020 10/01/2020 10/01/2020 Yes report Explanation for any deviation from planned completion date Due to the holidays period the assessment process was pushed forward. 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 10 Reporting period: 1 January 2020 - 31 December 2020 Contract signed Transport 17 01/02/2020 23/01/2020 23/01/2020 Yes and ITS study report Explanation for any deviation from planned completion date Since there was only one tenderer the process of signing the contract was shorter than expected. Transport and ITS study 18 01/06/2020 01/06/2020 04/06/2020 Yes interim report Explanation for any deviation from planned completion date The interim report was few days late due to the COVID-19 situation. Transport and ITS study 19 01/09/2020 01/09/2020 09/09/2020 Yes final report Explanation for any deviation from planned completion date The final report was few days late due to the COVID-19 situation. 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 11 Reporting period: 1 January 2020 - 31 December 2020 Overall technical progress achieved Previous ASR Start/end Activity 4 Title Planned Start/End date (GA) Actual Start/End date until the end of the dates previous reporting period (%)* Pilot implementation 1: dynamic traffic 01/09/2020 01/06/2022 01/09/2020 01/06/2022 22/10/2020 01/06/2022 0.00 management system in E265 section km 10-20 *Please explain how the percentage of the progress achieved has been estimated/calculated SUM(Technical Progress Per Activity Per Year * (GA EU Contribution Per Activity / Total GA EU Contribution)) Milestone Title1 Planned completion date (GA) Previous ASR date Actual completion date Reached (Y/N) no Publication of tender Pilot 20 01/10/2020 01/10/2020 22/10/2020 Yes 1 Explanation for any deviation from planned completion date There were discussions in the Estonian Road Administration how to formalise the tender since the transport and ITS study showed the need of bigger budget. The tender was divided into two tenders - design and building process tenders. The decision-making took some time which is the reason of the milestone daley. Assessment of offers Pilot 21 31/12/2020 31/12/2020 04/12/2020 Yes 1 Explanation for any deviation from planned completion date The tender took less time than expected. 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 12 Reporting period: 1 January 2020 - 31 December 2020 22 Contract signed Pilot 1 31/01/2021 31/01/2021 03/01/2021 Yes Explanation for any deviation from planned completion date The contract signing took less time than expected. Pilot 1 implemented 23 01/06/2022 01/06/2022 01/06/2022 No solution is in operation Explanation for any deviation from planned completion date 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 13 Reporting period: 1 January 2020 - 31 December 2020 Overall technical progress achieved Previous ASR Start/end Activity 5 Title Planned Start/End date (GA) Actual Start/End date until the end of the dates previous reporting period (%)* Pilot implementation 2: smart (safe and secure) 01/09/2020 01/06/2022 01/09/2020 01/06/2022 06/05/2020 01/06/2022 0.00 truck parking area in E265 km 1,5 *Please explain how the percentage of the progress achieved has been estimated/calculated SUM(Technical Progress Per Activity Per Year * (GA EU Contribution Per Activity / Total GA EU Contribution)) Milestone Title1 Planned completion date (GA) Previous ASR date Actual completion date Reached (Y/N) no Publication of tender Pilot 24 01/10/2020 01/10/2020 17/08/2020 Yes 2 Explanation for any deviation from planned completion date The activity was started earlier so there will be enough time to process the building permit after the design process. Delivery of the scoping 25 decision and subsequent 31/12/2020 31/12/2020 06/05/2020 Yes environmental permits Explanation for any deviation from planned completion date The environmental permit was delivered earlier so we could start the design tender process. 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 14 Reporting period: 1 January 2020 - 31 December 2020 Assessment of offers Pilot 26 31/12/2020 31/12/2020 22/09/2020 Yes 2 Explanation for any deviation from planned completion date Tender took less time than expected. 27 Contract signed Pilot 2 31/01/2021 31/01/2021 13/10/2020 Yes Explanation for any deviation from planned completion date Contract signing took less time than expected. Pilot 2 implemented 28 01/06/2022 01/06/2022 01/06/2022 No solution is in operation Explanation for any deviation from planned completion date 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 15 Reporting period: 1 January 2020 - 31 December 2020 Overall technical progress achieved Previous ASR Start/end Activity 6 Title Planned Start/End date (GA) Actual Start/End date until the end of the dates previous reporting period (%)* Implementation of dynamic traffic management system E265 01/11/2021 01/09/2023 01/11/2021 01/09/2023 01/11/2021 01/09/2023 0.00 in sections km 0-10 and km 20-30 *Please explain how the percentage of the progress achieved has been estimated/calculated SUM(Technical Progress Per Activity Per Year * (GA EU Contribution Per Activity / Total GA EU Contribution)) Milestone Title1 Planned completion date (GA) Previous ASR date Actual completion date Reached (Y/N) no Publication of tender E265 29 01/11/2021 01/11/2021 01/11/2021 No km 0-10 and km 20-30 Explanation for any deviation from planned completion date Assessment of offers E265 30 01/02/2022 01/02/2022 01/02/2022 No km 0-10 and km 20-30 Explanation for any deviation from planned completion date 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 16 Reporting period: 1 January 2020 - 31 December 2020 Contract signed for E265 31 30/04/2022 30/04/2022 30/04/2022 No km 0-10 and km 20-30 Explanation for any deviation from planned completion date E265 section solution km 32 0-10 and km 20-30 is in 01/09/2023 01/09/2023 01/09/2023 No operation Explanation for any deviation from planned completion date 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 17 Reporting period: 1 January 2020 - 31 December 2020 2.3 If total actual costs/units deviates >5% compared to latest Grant Agreement in force, please explain why Activity 3 Transport and ITS study for preparation of pilot 1 and 2 Transport and ITS study showed that the implementation will be more expensive. Since there was a budget surplus the remaining amount should be added to activity 4 and 5 budgets. Activity 4 Pilot implementation 1: dynamic traffic management system in E265 section km 10-20 Transport and ITS study showed that the implementation will be more expensive. Activity 6 Implementation of dynamic traffic management system E265 in sections km 0-10 and km 20-30 Transport and ITS study showed that the implementation will be more expensive than expected, on of many reasons is the cost of construction of portals above the road (6 driving lanes). 2.4. Description of the Action's and activities' progress planned in the on- going reporting period and until the end of implementation of the Action a) Provide a description of the planned progress of the activities in the on-going reporting period and, where applicable, beyond the on-going reporting period up until the end of the implementation of the Action (if the on-going reporting period is not the last one). b) Highlight and explain any deviation (e.g. on objectives of the Action, the completion of the planned activities, the cost-breakdown, Action's end date, etc.) in comparison to the latest grant agreement in force and, where applicable, latest ASR. c) Identify any expected/foreseen risk(s) that may challenge the actual end date of the Action and the associated mitigation plan(s). Which activities will start, continue, be completed? In the on-going reporting period (from 01/01/2021 until 31/12/2021) main activities include design process of km 0-30 VMS signs and pilot 2 (parking area). In addition, the preparation of building process tenders – pilot 1, pilot 2 and E265 km 0-10 and 20- 30 – will start. After that (from 01/01/2022 until 31/12/2022) the implementation of E265 km 0-10 and 20-30 is on-going and pilot I and II will be completed. In the last period (from 01/01/2023 until 31/12/2023) the implementation of E265 km 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 18 Reporting period: 1 January 2020 - 31 December 2020 0-10 and 20-30 will be done and the project finalisation press/final meeting event will be held. Which activity/milestone/task will never be completed and the reasons why (reduction of scope)? There aren’t any activities/milestones/tasks that will never be completed. Which any expected/foreseen risk(s) that may challenge the actual end date of the Action and the associated mitigation plan(s)? At this point there are some expected risks that may challenge the actual end date of some milestones. For example, the end date of implementing pilot 1 and 2 (expected date 01/06/2022). These milestones could be delayed due to the weather conditions in Estonia – it is difficult to build anything in the wintertime. In addition, the process of building permit of pilot 2 may take more time than expected. Thus, the actual date could be in late September 2022. Nevertheless, everything is done that the end date of the milestones will not be late. 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 19 Reporting period: 1 January 2020 - 31 December 2020 3. VISIBILITY OF UNION FUNDING (GA II.23.1.1.i or SESAR FPA II.23.1b.i) What measures have been taken within the previous reporting period to publicise the Action, including EU funding (GA II.7.1)? During the ongoing reporting period there were animated video about the project. It also was published in social media ERA's Facebook page. It had 36 likes and over 3600 views. A press release was issued to complete Transport and ITS study, please see thepress release here: https://www.mnt.ee/et/node/7469. Both animated video and Transport and ITS study can be found on ERA's project's page (https://www.mnt.ee/eng/roads/tallinn-ring-road-e265-its-project). 4. OTHER SOURCES OF EUROPEAN UNION FUNDS (CEF-E and Synergy only, GA II.23.1.1.m ) If applicable, provide information about other sources of EU funds (CEF, ERDF, Cohesion Fund, H2020, TEN, EEPR, EIPA, etc.) used for the project of common interest (e.g. previous or subsequent phases not covered by the Grant Agreement). Not applicable 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 20 Reporting period: 1 January 2020 - 31 December 2020 5. COMPLIANCE WITH EU LEGISLATION (GA.II.23.1.1g and h, or SESAR FPA II.23.1b.g and h) 5.1. Overview of environmental aspects, compliance with EU and national legislation, issues during the implementation of the Action and measures taken. According to the Grant Agreement the implementation of this Activity is subject to the acquisition of the necessary environmental permission, which will have to be requested and obtained in advance by the beneficiary. The environmental permission was declared and signed by Environmental Board on 06/05/2020. 5.2. Where relevant, information on the compliance with EU legislation notably on procurement: - information on the contracts awarded or planned for the implementation of the Action and on compliance with the requirements set out in GA II.9 and II.10 - regarding other matters, notably public procurement, competition, regulatory matters, (CEF-E only) the update of the CBCA decision, etc. The project’s pilot 1 design tender was closed on 30th November. Please see the tender: https://riigihanked.riik.ee/rhr-web/#/procurement/2475992/general-info There were two offers: Roadplan 117 645€ +VAT and Trafiction 59 664€ +VAT. Our estimated cost was a little bit lower but due to the market situation (the majority of road design companies have a lot of work), the offers were a bit higher. Although, we can manage with the lower bidder offer (Trafiction). The contract was signed on 3rd January 2021 and lasts until May 2021. In addition, we are also in the process of Activity 5 – truck parking area design. The design tender was published 17.08.2020 and the contract was signed on 15.10.2020 with Roadplan OÜ with price of 53 460€ +VAT. Please see the tender: https://riigihanked.riik.ee/rhr-web/#/procurement/2218272/general-info The work will be done by May 2021. 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 21 Reporting period: 1 January 2020 - 31 December 2020 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 22 Reporting period: 1 January 2020 - 31 December 2020 6. IMPLEMENTATION SCHEDULE, GOVERNANCE AND MONITORING, OTHER RELEVANT ADMINISTRATIVE PROVISIONS (GA II.23.1.1.k and l, or SESAR FPA II.23.1b.k and l) 6.1. In the first ASR, information on implementation schedule, such as critical path, key performance rates and risk analysis; in subsequent ASR, information on any modifications and, if applicable, on the progress of the implementation of the arrangements referred to in previous ASR. If there are changes in the Action timetable as compared to the latest planning (Grant Agreement or previous ASR), attach an updated Gantt chart. Action’s implementation schedule is attached as an Excel file under the name “timetable”. There is one critical bath which is the whole project’s milestones and timeline. The Action’s risk analysis is also attached under the name “risk assessment grid by activities” which was also in the proposal and updated if needed. 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 23 Reporting period: 1 January 2020 - 31 December 2020 Action's implementation technical progress (cumulated %) 2019 2020 2021 2022 2023 Action Current Current Current Current Current Previous ASR Previous ASR Previous ASR Previous ASR Previous ASR level ASR ASR ASR ASR ASR 0 0 6 8 50 35 88 88 100 100 Current Current Current Current Current Activity Previous ASR Previous ASR Previous ASR Previous ASR Previous ASR ASR ASR ASR ASR ASR 1 4 4 27 18 52 41 77 71 100 100 2 6 6 26 25 60 32 80 66 100 100 3 0 0 62 100 100 100 N/A 100 N/A 100 4 N/A 0 0 0 50 41 100 100 N/A 100 5 N/A 0 0 0 67 38 100 100 N/A 100 6 N/A 0 N/A 0 0 0 50 50 100 100 All the activities and the Action will achieve 100% of technical progress by their actual end dates 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 24 Reporting period: 1 January 2020 - 31 December 2020 6.2. In the first ASR, information on governance and monitoring of the Action, such as organizational structure, internal coordination, communication and reporting, and decision making process; in subsequent ASR, information on any modifications and, if applicable, on the progress of the implementation of the arrangements referred to in previous ASR. The ERA in-house project team consists of the following ERA employees: • Project manager – is responsible for coordinating and organizing project activities in Estonia. Regular reporting to INEA. • Head of traffic management centre – implementing traffic and other technical solutions in the ITS area of the project. • Financial controller – accounting for project costs, arranging bridge financing and advising on the management of expense receipts. • IT architect – preparation of project IT solutions and architectural requirements and implementation monitoring. • Communication expert – arranging public communication for the project. The ERA in-house team has monthly meetings. Depending on the progress of the project and which Activities are on-going, the necessary team members will be involved with the meetings. In addition, other support staff will be included if necessary. During the period which have contractors project manager will attend the weekly meetings with them and brings information to the in-house team, if necessary, other will attend the meeting as well. In ERA there is also weekly briefing between the departments where information about the project will be discussed if necessary. 6.3. In the first ASR, information on other relevant administrative provisions, such as quality controls and audits; in subsequent ASR, information on any modifications and, if applicable, on the progress of the implementation of the arrangements referred to in previous ASR. There aren’t any extra quality control measures in ERA. Although, a process map (for example the procurement process describes which activities are in the process and how they should be done) is similar to quality standard and it is followed. This Action hasn’t been audited. ANNEX: Financial information (GA II.23.1.1.d to f or SESAR FPA II.23.1b.d to f) 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 25 Reporting period: 1 January 2020 - 31 December 2020 CERTIFICATION OF THE MEMBER STATE* (applicable only for ASR and for beneficiaries established in the European Union) Name Position Entity Telephone Nº E-mail In compliance with Article II.23.1 (or SESAR FPA II.23.1b) of the GA, it is certified that the information provided by the following Beneficiary(ies) in the ASR is full, reliable and true.  Estonian Road Administration Date and signature Stamp (optional) * In line with the terms of Art. 22 of the CEF Regulation 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021 26 REQUEST OF FURTHER PRE-FINANCING PAYMENT INEA/CEF/TRAN/M2018/1 Grant Agreement Nº 767529 Action number 2018-EE-TM-0029-M Dynamic traffic and truck Action title parking management Estonian Road Beneficiary name Administration Financial information for the Action A. Maximum EU contribution (Art. 3) 1,900,000.00 € B. Pre-financing rate (Art. 4.1.2) 40.00 % C. Maximum pre-financing payment (Art. 4.1.2) 760,000.00 € (=B*A) D. Maximum ceiling for the sum of pre-financing 1,520,000.00 € and interim payments (Art 4.1.3) (=80%*A) E. Sum of previous pre-financing payments 44,526.98 € F. Sum of interim payments 0.00 € Dear Sirs, Along with the submission of the 2021 ASR for the Action in subject, we hereby submit a request for further pre-financing. Please find enclosed:  the amount of the previous pre-financing used to cover costs of the Action,  the amount of the requested further pre-financing;  the allocation of the amounts to be paid to each beneficiary and the methodology used (if applicable)  the financial guarantees (if applicable) 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021_Estonian Road Administration ENCLOSED Amount of the previous pre-financing used to cover costs of the Action G. Total estimated direct eligible costs incurred until the end of the previous reporting period 151,690.40 € H. 70% of previous pre-financing payments (=70%*E) 31,168.89 € Condition of 70% fulfilled (G>=H) Yes I. Reduction of further pre-financing, if G<H (= H-G) 0.00 € Amount of the requested further pre-financing J. Total estimated direct costs eligible declared until the end of the on-going current report period 1,173,527.20 € K. Total cumulated financing needs until the end of the on-going current report period 586,763.60 € L. Further pre-financing payment (=B*K-E) 190,178.46 € L1. Revised further pre-financing payment if the condition of the 70% is not fulfilled – article II.24.1.3 (L-I) 190,178.46 € L2. Revised further pre-financing if the total pre-financing exceeds the maximum pre- financing payment (E+L1<=C) 190,178.46 € L3. Revised further pre-financing if the sum of the pre-financings and interim payments exceeds the ceiling (E+F+L2<=D) 190,178.46 € M. Final further pre-financing to be paid (=L3) 190,178.46 € 2018-EE-TM-0029-M_ASR2021_1_draft_20210209_1021_Estonian Road Administration
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel