dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Majandus- ja Kommunikatsiooniministeerium
LepingAvalik

Leping

Majandus- ja Kommunikatsiooniministeerium · 12. veebruar 2021
Viit
17-10/17-0460/885
Registreeritud
12. veebruar 2021
Dokumendi liik
Leping
Funktsioon
17 Energeetikaalase tegevuse korraldamine
Sari
17-10 Energeetikaprojektide toimikud (Arhiiviväärtuslik)
Toimik
17-10/17-0460
Vastutaja
Anastassia Batulin

Failid

  • 📎17-1017-0460885 12.02.2021 Leping (1).asice1731 KB

Sisu (failidest)

ANNEX 1 Ministry of Economic Affairs and Communications Preliminary evaluation of Estonian geoenergy potential and overview of available technologies. Expert opinion for using those technologies in Estonian geological conditions. Suggestions for possible further actions. Examples of case studies. 1. Background Developing renewable energy projects, producing and using renewable energy is environmentally friendly economics. Set goals for increasing the share of renewable energy by the European Union and Estonia are ambitious. The Estonian National Energy and Climate Plan (NECP) sets the goal for renewables from gross final energy consumption to 42%1 by the year 2030. While wind and solar play a crucial role in electricity sector, a broader view for decarbonization of the whole energy system is desired in Green Deal2. One so far less studied potential for the decarbonized heating production is geothermal energy. There have been different pilots using geothermal energy in other countries. For example, in Finland Otaniemi3 project where 6 km deep holes will cover 10% of the district heating need in Espoo. Considering the above, we are looking for an analysis that estimates the potential usage of geothermal energy in Estonia for heating. To be specified further parts in this call, the study should be focused on geothermal heating potential implementation in Estonia. This analysis will focus on deep geothermal energy ( 300m deep, thermal capacity 1 MW). 2. Expected outcomes The outcome of this analysis consists of five parts: a. Preliminary assessment of geothermal energy potential in Estonian energy sector b. Overview of current technologies used that and applicable in Estonian geological conditions c. Suggestions for possible future actions (additional analyses etc.) d. Possible pilots in optimal capacity Case studies from neighbouring countries (for example Finland) and similar geological areas. 2.1 Structure of the analysis 2.1.1 Preliminary assessment of geothermal energy potential in Estonian energy sector In this section an overview of Estonian geological structure is given. Considering Estonian geological conditions, the potential of using that energy is explained. 2.1.2 Overview of current technologies used that are applicable in Estonian geological conditions In this section an overview of current technologies used in geothermal energy sector, is given. These technologies include drilling holes, using heatpumps, seasonal storage etc. Important addition is to bring out the possible usage of these technologies in Estonian geological conditions. If applicable TRL level of these technologies should be addressed. 1 https://ec.europa.eu/energy/sites/ener/files/documents/ee_final_necp_main_ee.pdf 2 https://ec.europa.eu/info/strategy/priorities-2019-2024/european-green-deal_en 3 https://www.st1.fi/geolampo 2.1.3 Suggestions for possible future actions (additional analysis etc.) Given the potential, the suggestions for future actions is given in this section. These suggestions might include additional analysis that are specific and have specific outcomes. 2.1.4 Possible pilots in optimal capacity In this section, possible pilots and optimal scales for these pilots are given. The size of Estonian district heating or other systems must be considered in these optimizations and locations. 2.1.5 Case studies from neighbouring countries (for example Finland) and similar geological areas In this section an overview from 2-5 case studies is given that are from similar geological area in some extent. Case studies that are possibly applicable in Estonia is desired to be addressed in this section. Economics of case studies are given (capacity (kw) of the projects, investment cost (CAPEX) and operating cost (OPEX), final price of heat for consumers, profitability, project lifetime etc) For case studies one possible sourcing could be the GEO-ENERGY EUROPE metacluster that brings together the European know-how, technologies and experience in geo-energy, with an emphasis on its SMEs’ offer and a focus on deep geothermal energy. 3 All data given in this analysis is referenced accordingly with usable links. 3. Methodology With application the methodology approach is to be provided by the tenderer. The description is one of the evaluation criteria. Additionally, to the methodology the tenderer will submit a suggested timeline which does not exceed 14 weeks. Timeline contains: a. Interim report for each part (possible to submit parts simultaneously) b. Feedback time one week for contracting authority c. Possible improvements according to feedback from contracting authority d. Submission of the full report 4. Timeline The analysis must be delivered by latest 14 weeks from the signing of the contract. This timeframe must include submission of the preliminary results and time for possible additions. 5. Price of the analysis The price of the analysis is expected to be around 15 000 euros, excluding VAT. The price of the tender is to be quoted in euro. The price of tender shall include all expenses, taxes (except for VAT), fees and other charges that the tenderer has to pay or bear in relation to the service. The quoted price of the tender is final. The tenderers may not request the contracting authority for additional payments. 3 https://www.geoenergyeurope.com/ The price quoted may not be revised in line with exchange rate movements. 6. Evaluation The tender will be awarded using the following criteria: a. Tenderers understanding of the assignment and alignment with the concept needs of contracting authority. This is evaluated through described methodology in the tenderers offer – 60 % of the final evaluation. - 60 points will be awarded, when the methodology of the study is purposeful and described in detail, the selection of the methodology is clearly and understandably justified. - 36 points will be awarded, when the methodology of the study is in general fit for purpose and partially described, the selection of the methodology is clearly and understandably justified. - 24 points will be awarded, when the methodology of the study is described in general and/or the selection of the methodology is not clearly and understandably justified. - 0 points will be awarded, when the chosen methodology for the study will not lead to a successful completion of the study. The tenderers have not clearly explained their reasoning behind their methodology. b. Price (up to 40 points) - The lowest price tender will receive 40 points. - The other tenders will receive points according to the following formula: 𝑙𝑜𝑤𝑒𝑠𝑡 𝑠𝑢𝑏𝑚𝑖𝑡𝑡𝑒𝑑 𝑝𝑟𝑖𝑐𝑒 40 ∙ 𝑠𝑢𝑏𝑚𝑖𝑡𝑡𝑒𝑑 𝑝𝑟𝑖𝑐𝑒 7. Declining the offers Contracting authority has the right to decline any offers that exceed the expected price of the analysis or does not fit to set criteria of this tender. Contracting authority has the right to dismiss this call if during the call new information has been revealed that will make the content of this call meaningless. 8. Rights of authorship Any right of authorship is given to the contracting authority. The fee is included in the price of the offer. Tenderers will have to confirm that they have the right to assign the analysis to the contracting authority. 9. Acceptance of tender and other conditions The successful tender shall be the most economically advantageous tender. By submitting a tender, the tenderers confirm that they have sufficiently examined the contract documents and agree with the conditions specified in these documents. The tender must comply with all the conditions specified in the contract notice and contract documents. CONTRACT FOR SERVICES 17-10/17-0460/885 Tallinn 12.02.2021 Ministry of Economic Affairs and Communications, registry code 70003158, registered address Suur-Ameerika 1, 10122 Tallinn, Estonia, represented on the basis of the statutes by Secretary General Ando Leppiman (hereinafter referred to as Customer), and Penurco Oy, registry code Y 3170562-8, registered address, Mechelininkatu 17 A 5, 00100 Helsinki a/c No. Fi 98 3131 1002 2265 32 with Handelsbanken bank), represented by the Member of the Management Board Prof. Pekka A. Nurmi, have hereby made the following contract for services (hereinafter: Contract): 1. General provisions 1.1. The objective of the Contract is to regulate the relationships, rights, obligations and liability of the Parties in the performance by the Contractor of the work which is the object of this Contract. 1.2. In the regulation of mutual relationships, the Parties shall be guided by this Contract, and in the issues not regulated with this Contract by the legislation effective in the Republic of Estonia. 1.3. The Contract is hereby concluded as a result of a public procurement 1 tendering procedure for the Preliminary evaluation of Estonian geoenergy potential and overview of available technologies. Expert opinion for using those technologies in Estonian geological conditions. Suggestions for possible further actions. Examples of case studies and in accordance with the public procurement documentation and the tender of the Contractor, which was declared successful. 1.4. Representatives of the Parties hereby confirm that they have full and adequate authorisation for the conclusion of this Contract in the name of the person represented and that there are no obstacles they are aware of for the fulfilment of their obligations provided in this Contract. 1.5. The terms Customer and Contractor include all individuals employed by the Customer or the Contractor and also all other persons involved by the Customer or Contractor in the fulfilment of this Contract with the consent of the other Party. 11 Basis: Procurement procedure of the Ministry of Economic Affairs and Communications § 9 „Public procurement below the small procurement treshold“ 2 1.6. Representative of the Contractor hereby confirms that the Contractor has adequate technical competence and resources for the professional fulfilment of the Contract according to the requirements. 1.7. The Contract documentation consists of this Contract, annexes to this Contract and any amendments to the Contract that may be agreed upon after signing this Contract. 1.8. This Contract is hereby signed with the following annexes: 1.8.1. Annex 1 – Procurement documentation including technical specification 1.8.2. Annex 2 – Tender submitted by the Contractor 2. Object of the Contract and due date for the completion of Work 2.1. Preliminary evaluation of Estonian geoenergy potential and overview of available technologies. Expert opinion for using those technologies in Estonian geological conditions. Suggestions for possible further actions. Examples of case studies (hereinafter referred to as the Work). The Work consists of Preliminary assessment of geothermal energy potential in Estonian energy sector, Overview of current technologies used that are applicable in Estonian geological conditions, Suggestions for possible future actions (additional analysis etc.), possible pilots in optimal capacity, case studies from neighbouring countries (for example Finland) and similar geological areas. More detailed description is given in the Annexes. 2.2. The Contractor shall perform the Work specified in Article 2.1 and shall deliver the Work to the Customer no later than 14 weeks after signing of this contract. 3. Rights and obligations of the Customer 3.1. The Customer shall have the right: 3.1.1. to require from the Contractor high-quality and timely performance and delivery of the Work according to the requirements and terms and conditions of the Contract; 3.1.2. to check the progress of the Work and request information from the Contractor on the performance of the Work. 3.2. The Customer shall be obliged: 3.2.1. to create the necessary conditions for the Contractor for the performance of the Work, and to present or arrange access for the Contractor to the data and information required for the performance of the Work; 3.2.2. to accept and review the Work presented by the Contractor and, in the case of non- conformity of the Work with the terms and conditions of the Contract, to send to the Contractor the respective written notice within the term specified in Article 5.2, setting the due date for the removal of the shortcomings; 3.2.3. to approve the Work presented by the Contractor if the Work has been performed according to the requirements and conforms to the description presented in Annex 1; 3.2.4. to pay for the Work to the Contractor according to the terms and conditions provided in this article of 6 the Contract. 4. Rights and obligations of the Contractor 4.1. The Contractor shall have the right: 4.1.1. to require from the Customer the creation of the necessary conditions for the performance of the Work, and presentation or arrangement of access to the data and information required for the performance of the Work; 4.1.2. to use its work methods and equipment for the performance of the Work; 3 4.1.3. to request from the Customer the removal of illegitimate obstacles from the performance of the Work; 4.1.4. to receive the payment provided in Article 6 for the Work performed according to the requirements and approved by the Customer. 4.2. The Contractor shall be obliged: 4.2.1. to perform the Work professionally and at high quality and in accordance with the terms and conditions of the Contract and Annex 1 presented in the tender documentation and to deliver the Work to the Customer or to the person indicated by the Customer by the due dates and according to the procedure specified in the Contract; 4.2.2. to perform the Work following the requirements established in the Contract and in the legislation and to ensure fulfilment of the obligations arising from the Contract in accordance with good practice; 4.2.3. to perform the Work personally or to involve third persons in the performance of the Work with the consent of the Customer; 4.2.4. to allow the Customer to check the progress of the Work and to present information at the request of the Customer on the performance of the Work; 4.2.5. to notify the Customer immediately of any delays in the performance of the Work, also to notify the Customer of any other circumstances that may have an impact on or impede the fulfilment of the obligations or exercising of rights provided in the Contract; 4.2.6. in the case of non-conformity of the Work to the terms and conditions of the Contract to remove any shortcomings in the Work at the request of the Customer or to present a new Work which conforms to the terms and conditions of the Contract by the due date indicated by the Customer; 4.2.7. to keep the data and information acquired in the course of performance of the Work fully confidential before third persons; 4.2.8. to surrender to the Customer all proprietary rights related to the Work from the moment of approval of the Work by the Customer. The Contractor shall have no right to transfer to third persons any rights which are similar to the rights surrendered to the Customer. – 4.2.9. Together with the object of this Contract, the Contractor shall deliver to the Customer all proprietary rights to the object of the Contract and hereby confirms its full authorisation for their assignment to the Customer, and in the case of any claims of third persons to the Customer in relation to these rights, the Contractor shall compensate to the Customer any damage and expenses arising from such claims. 4.2.10. The Contractor shall give the right to the Customer to modify/merge the Software to other software used by the Customer at the responsibility of the Customer (modifier/merger), and the Contractor hereby confirms its full authorisation for their assignment to the Customer, and in the case of any claims of third persons to the Customer in relation to these rights, the Contractor shall compensate to the Customer any damage and expenses arising from such claims. 4.2.11. The proprietary rights fee is included in the fee specified in clause 6. 5. Delivery and acceptance of the Work and approval of the Work 5.1. The Contractor shall present the Work by the due date indicated in Article 2.2 together with delivery and acceptance reports executed in writing and signed by both Parties. 5.2. The Customer shall review the Work and send to the Contractor the written notice on the approval or disapproval of the Work within 10 working days from the date of signing the 4 report on delivery and acceptance of the Work. If the above-mentioned written notice is not sent within the term specified, the Work shall be deemed as approved by the Customer. 5.3. If the Work does not conform to the terms and conditions of this Contract, the Customer shall indicate the specific shortcomings of the Work and set a reasonable term for their removal or for the performance of a new Work which conforms to the terms and conditions of the Contract. 6. Amount of the payment, due dates and procedure for payments 6.1. The price of the Contract is 11 800 euros to which value-added tax of 0 % shall not be added. 6.2. The Customer shall pay for the Work performed after the approval of the Work within 21 days from the reception of the invoice presented by the Contractor. 7. Liability 7.1. A Party which has violated the Contract shall have to compensate the related damage to the other Party. 7.2. If the Work does not conform to the requirements agreed upon in the Contract, the Contractor shall be liable for the violation of the Contract. 7.3. If the Contractor fails to present the Work ordered by the due date for reasons which are not under the control of the Customer, the Customer shall have the right to claim from the Contractor a forfeit of 0,15% of the price of the Work for each day delayed with the delivery or performance of the Work. 7.4. If the Contractor violates any obligations arising from the Contract, the Customer shall have the right to request the removal of the violations by setting a reasonable deadline to the Contractor for the removal of the violation. If the Contractor fails to fulfil the request within the term allowed, the Contractor shall pay to the Customer the forfeit of 0,15% the price of the Work for each day delayed with the delivery or performance of the Work. 7.5. The Customer shall have the right to reduce by the forfeit amount the amount payable to the Contractor for the Work. 7.6. If the Work does not conform to the requirements and the Contractor fails to remove the shortcomings or to present a new Work performed according to the requirements by the due date set by the Customer according to Article 5.3, the Customer shall have the right to reduce the agreed price of the Work by up to 10% and/or to withdraw from the Contract and to request compensation for the damage caused. 7.7. In the case of a failure to pay in due time the invoice for the Work performed according to the requirements and approved by the Customer, the Customer shall have to pay a fine for delay, which shall be 0,03% of the amount delayed for each day delayed. 7.8. Payment of the fines for delay and forfeits specified in the Contract shall not relieve the Parties from the fulfilment of other obligations arising from the legislation and from this Contract. 8. Force Majeure 8.1. The Parties shall be liable for the violation of their obligations except if the violation was justifiable. Violation of an obligation is justifiable if it was caused by circumstances which were unforeseeable or not under the control of the Party (force majeure). Impeding circumstances which were not under the control of a Party or which the Party could not reasonably have expected to take into account or prevent or overcome or to overcome their consequences at the time of signing this Contract are regarded as force majeure. 5 8.2. In the case of occurrence of a force majeure, the terms specified in the Contract shall be extended by the period during which the factors of a force majeure shall keep it from the fulfilment of the Contract. 8.3. The Party which violates the Contract due to the circumstances of a force majeure shall have to notify the other Party of the circumstances of the force majeure and their effect immediately after the Party became aware of the circumstances of a force majeure. A Party shall be obliged to take measures as much as possible for the prevention of the damage caused by the circumstances of a force majeure or its consequences or for the reduction of their impact. The Party shall be obliged to continue the fulfilment of its contractual obligations as soon as the circumstances of a force majeure have been removed. 9. Exchange of information 9.1. The Parties shall be obliged to inform each other of any circumstances which may have an effect on or impede the fulfilment of obligations or exercising of rights specified in the Contract. 9.2. Any notices and information related to the fulfilment of the Contract or arising from the Contract shall be deemed as presented formally and according to the Contract if these notices have been sent to the Party in writing (or electronically with a digital signature) or delivered to the other Party against signature at the address indicated in the Contract which the Party has informed the other Party of in writing after signing the Contract. 9.3. Requests for termination of the Contract by the Parties, also claims of one Party to the other due to a violation of the Contract shall have to be in writing above all. An informative message can also be given over the phone. 9.4. A Party shall inform the other Party of any changes in the information presented in the Contract within 2 (two) working days from the date of making the changes. 10. Validity, amendment and termination of the Contract 10.1. This Contract shall take effect from the moment of signing the Contract and annexes to the Contract by both Parties and shall remain in effect until the due fulfilment of the obligations by the Parties. 10.2. The Parties shall have the right to agree on amendment of the Contract only in case the amendment is due to objective circumstances which could not be anticipated by the Customer during the award of the Contract and in case of leaving the Contract unchanged, the achievement of the objective set with the Contract would be fully or in material part set at risk. 10.3. The Parties shall have the right to early withdrawal from or cancellation of this Contract in case of significant violation of the obligations arising from this Contract by the other Party. This Contract can be cancelled immediately without an advance notice if the other Party has failed to fulfil its contractual obligations and has not removed the violation within 30 days from the presentation of a request to stop the violation to the Party or, in the case of submission of non-conforming Work, has not removed the shortcomings within the term specified in Article 5.3. 11. Settlement of disputes 11.1. Any disputes arising from the fulfilment, amendment, termination of the Contract or from bearing the respective liability shall be settled by way of negotiations. 6 11.2. If no agreement is reached as a result of the negotiations, the dispute shall be settled according to the procedure provided in the legislation at the court of law of the jurisdiction of the customer. Legislation of the Republic of Estonia shall apply to the content of this Contract. 11.3. The Contract shall be interpreted proceeding from the joint actual intentions of the Parties even if it deviates from the customary meaning of the words. If the joint actual intentions of the Parties cannot be determined, the Contract shall be interpreted in such a manner as a reasonable person similar to the other Party should have understood the Contract in similar circumstances. 11.4. A provision of the Contract shall be interpreted in combination with other provisions of the Contract by assigning each of them a meaning proceeding from the meaning of the Contract as a whole. 12. Other provisions 12.1. Neither Party can assign to third persons any rights or obligations arising from this Contract without the consent of the other Party. 12.2. Any information received on the basis of this Contract is confidential and shall not be disclosed to third persons. Disclosure of any confidential information related to this Contract to third persons shall only be allowed with a prior written consent of the other Party. The confidentiality requirement provided in this Contract shall not apply to the disclosure of the information to the auditors, lawyers and banks of the Party and to the cases when the Party is obliged to disclose information proceeding from the legislation. The Contractor is aware of the public nature of the Contract except the parts which have been designated for internal use on the grounds arising from the Public Information Act. 12.3. The Contract has been signed digitally. 13. Authorised representatives of the Parties 13.1. The authorised representative of the Customer in the fulfilment and verification and acceptance of the terms and conditions of this Contract is Kristjan Lepp tel.+372 6397602, e- mail address: [email protected] 13.2. The authorised representative of the Contractor in the fulfilment and verification of the terms and conditions of this Contract is Prof. Pekka A. Nurmi., tel. +358 40 504 5236, e-mail address: [email protected] 13.3. The authorised representative of the Customer shall have the right to represent the Customer in all issues related to the Contract, except issues related to the amendment of the Contract (above all increasing the volume of the Contract, significant changes in the object and/or due date of the Contract), unilateral termination of a Contract with a definite term and presentation of a claim for forfeit, fine for delay and/or damages. 13.4. If the Contractor or Customer replaces its representative with another person, it will inform the other Party immediately of the fact in writing. Signatures of the Parties: Customer: Contractor: Ministry of Economic Penurco Oy Affairs and Communications 7 (digitally signed) (digitally signed) Ando Leppiman Prof. Pekka A. Nurmi Secretary General Member of the Management Board 1 ANNEX 2 Penurco Oy/Prof. Pekka A. Nurmi Tender 7 Jan. 2021 Company Reg. No: Y 3170562-8 Mechelininkatu 17 A 5, 00100 Helsinki [email protected] Phone +358 40 504 5236 The Ministry of Economic Affairs and Communications Ref. Tender Notice 17 Dec. 2020 Preliminary evaluation of Estonian geoenergy potential and overview of available technologies. Expert opinion for using those technologies in Estonian geological conditions. Suggestions for possible further actions. Examples of case studies. 1. Introduction Geothermal energy (geoenergy) offers a potential, but largely unutilized energy source in Estonia which would help in decreasing carbon emissions. Traditionally, geothermal energy has been used in geological areas exposing high geothermal gradient, which means areas where the bedrock temperature is relatively high near the surface. However, there has been in the past decades a rapid growth in the utilization of lowenthalpy geothermal energy (geoenergy) in geological regions where the geothermal gradient is low, such as, in Finland and Sweden. These applications are depended on the effective use of heat pumps. Recent fast development in the neighbouring countries, particularly in Finland and Sweden, has shown that geoenergy has a good potential in building renewable and economically feasible heating, cooling and energy storage applications. Geoenergy solutions can save operational costs up to 70-80% and provide practically carbon neutral energy. Geoenergy has principally been applied for a long time in a small scale for single family house heating. Recent projects on utilizing either large energy well fields, or deep (over 2500 m) and semi-deep (500-2500 m) geoenergy demonstrate that these solutions can be used also in a larger scale in heating/cooling, e.g., for large industrial complexes, hospitals, hotels, or areas of several apartment blocks. Development of drilling and heat-pump technology has made the progress viable. Planning or building of any larger geoenergy heating systems needs good understanding of local geological and geophysical (thermophysical) conditions, because these determine heat production capability of the site and sustainability of energy production. Key geological parameters include composition, structure and thermogeological properties of the bedrock. Furthermore, groundwater has an important role in heat transfer. This analysis will be done by Prof. Pekka A. Nurmi (Penurco Oy). He is an internationally recognised geoscientist who has profound understanding on bedrock geology in the Fennoscandian Shield and on the 2 sustainable use of various georesources, including geothermal energy solutions (CV attached). Last year Prof. Nurmi made an evaluation on the performance of the Estonian Geological Survey, including suggestions on future development of the Survey and recommendations for the studies of Estonian georesources. He is very well networked with the science and business communities related to the key aspects on the sustainable use of georesources and geoenergy. 2. Structure of the analysis 2.1. Preliminary assessment of geothermal energy potential in Estonian energy sector This section will provide an overview of Estonian bedrock geology and its theoretical potential for geothermal energy production. Existing geological and thermogeological data from Estonia will be used. An important part will be comparison with the Precambrian geology in southern Finland, where detailed geological and thermogeological information exists, as well as various evaluations of geothermal energy potential. This is justified by the fact that the Precambrian Fennoscandian extends from southern Finland to Estonia and forms the Estonian bedrock below the younger 150 m to 600 m thick sedimentary rock cover. Therefore, Precambrian crust forms also in Estonia the bulk of the potential source area of industrial-scale geothermal energy. 2.2. Overview of current technologies used that are applicable in Estonian geological conditions This section will give an overview of current technologies used in geothermal energy sector in areas comparable to Estonia with special focus to Finland. Particularly, larger-scale systems currently used in deeper (>500 m) energy wells will be discussed in detail. The technologies will include geological evaluation methods, thermogeological study methods, geothermal energy potential estimation, drilling technologies, pipes for liquid circulation, heat pumps, and seasonal energy storage systems. Also, ongoing development of future technologies, such as super-deep twin hole systems in cracked bedrock will be introduced. 2.3. Suggestions for possible future actions (additional analysis etc.) In this section a preliminary road map for the development of geothermal energy in Estonia will be suggested. This will be based on European and various national strategies, taking in consideration of Estonian societal, economic, and geologic framework conditions. Emphasis will be in the follow up, more detailed study of geothermal energy potential of Estonia, selection of test areas, and particularly geological and thermogeological properties, and modelling of test areas. These studies are crucial for any larger pilot projects. A proposal for a stepwise approach will be given. 2.4. Possible pilots in optimal capacity Suggestions for two to three types of pilot projects will be given. These include different scales in energy production and investment. Also, proposals for the location of the pilots will be given considering Estonian district heating systems and local needs for development towards low-carbon emissions. 3 2.5. Case studies from neighbouring countries (for example Finland) and similar geological areas An overview of five case studies will be given from nearby areas. For the selections of the case studies, various geoenergy portals and company presentations will be employed. The cases will be selected in such a way that they could potentially be applicable in Estonian geological environment, as well. Economic and technical information of case studies will be given including: capacity (kw) of the projects, investment cost (CAPEX) and operating cost (OPEX), and final price of heat for consumers, profitability, and project lifetime. Accuracy and coverage of any economic and technical data will depend on the availability of such information on the projects. References and contact information of the projects will be given. 3. Methodology The most important and at the same time the most challenging part of this study is understanding applicability the Estonian geological framework for geoenergy production. For this purpose, thermogeological and geothermic data available in Estonia will be compiled and interpreted. Such studies and data from Estonian crystalline basement are rather scarce, but sporadic information exists, published e.g., by Kukkonen and Jõeleht. Heat in the upper part of the bedrock (ca. down to 1-2 km) originates mostly from the sun, whereas deeper the proposition of radiogenic heat gradually increases. A crucial question in Estonian conditions is the impact of up to hundreds of metres thick sedimentary cover for the thermogeological properties of the Precambrian basement? It is not yet well known whether the cover has sealed and stored heat in the basement, or does it act as an insulator preventing sun-produced heat to be stored in the upper part of the crystalline basement rocks? Careful study of existing geological and thermogeological data will give preliminary information on the question. It may also provide preliminary understanding on the nation-wide potential of deep geoenergy in Estonia. Estonian basement rocks being part of the Fennoscandian Shield have basicly similar thermogeological and geological properties as similar rocks in southern Finland. Because extensive data bases and various modelling information exist in Finland, these can be used to interpret the sporadic data from Estonia. Theoretical calculations and maps of geoenergy potential to various depths has been done in the Helsinki area and also nation-wide in Finland. The data and maps will provide a tool to extrapolate information to Estonia. This will give the first estimates for geoenergy potential in Estonia. For the geoscientific part of the study relevant data and information will be actively collected in Estonia and Finland. In addition to knowledge and experience of Prof. Nurmi, interpretation will benefit with personal discussion with colleagues at the Geological Surveys of Estonia and Finland, and with the Universities of Tartu, Taltech and Helsinki. The technology and case study part of the study will be based on use of existing knowledge on various projects, particularly in Finland, which will be updated and complemented with an active search using various public sources. Management level people at key players in the geoenergy and technology provides (e.g., St1 Energy, Rototec, QHeat and Adven) and geoenergy users (e.g., Helen and Vantaan Energia) will be personally interviewed to get more detailed and up to date information on future, ongoing and recently completed projects. References or links will be given to all data and other information used. 4 4. Timeline The final report will be delivered 14 weeks from the signing of the contract. An interim report containing drafts of each sections will be provided for possible comments on improvements 10 weeks after signing the contract, or as otherwise agreed with The Ministry of Economic Affairs and Communications. Feedback time is one week for the Ministry. 5. Price of the analysis The price of the analysis is 11 800 € (excl. VAT) including all expenses. Appendix: CV of Prof. Pekka A. Nurmi
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel