Estonia–Russia CBC Programme 2021-2027
LARGE INFRASTRUCTURE PROJECT IDEA FORM
Name of the project* Reconstruction of the road bridge
infrastructure across the Piusa river at the
Koidula - Kunichina Gora border crossing.
Description of the problem/challenge The road bridge over the Piusa River at the
for the cross-border region Koidula border crossing is depreciated and
does not meet the contemporary safety
requirements.
Potential project partner(s) Estonian Road Administration, Estonian Police
and Border Guard Board, corresponding
agencies of the Russian Federation
Project activities – short description Construction of a new bridge next to the
and location existing one to ensure continuous cross-border
traffic during the reconstruction period. In the
future, both the new and the reconstructed old
bridge will in operation, which will allow
separating cross-border traffic in opposite
directions, as well as pedestrians from vehicle
traffic.
Project outputs Bridge crossing safety will increase for
pedestrians and vehicle. The new crossing area
infrastructure will be developed for the
pedestrians and road traffic lanes will be
connected to parking areas on both sides of the
border. In addition, it will facilitate the
transport and export of both conventional and
custom-sized goods.
Estimated project budget (EUR) in 700 000 €
total and by partner
Contact information Estonian Road Administration
* Field can be left empty
Estonia–Russia CBC Programme 2021-2027
LARGE INFRASTRUCTURE PROJECT IDEA FORM
Name of the project* Construction of an contact line connection with Russian railway and
electrification of a Narva-Kingisepp (Veymarn) railway section.
Description of the problem/challenge Estonian Railways will finalize electrification project from Tapa to Narva
railway station by the end of 2025. After that will be non-electrified only
for the cross-border region 35km of railway to east direction. Because of this situation is not possible
to use on line St Petersburg-Tallinn only electric trains (passenger and
freight trains).
Potential project partner(s) Russian Railways (Oktyabrskaya Railway or October Railway)
Project activities – short description Construction of railway contact network and traction substation(s)
between Narva (EST) & Veymarn (RU)
and location
Project outputs Reduce of CO2, lower noise & better dynamics, better opportunities for
passengers and for the movement of goods
Estimated project budget (EUR) in approx 15 million EUR
total and by partner
Contact information AS Eesti Raudtee; +372 615 8610;
[email protected]
* Field can be left empty
Estonia–Russia CBC Programme 2021-2027
LARGE INFRASTRUCTURE PROJECT IDEA FORM
Name of the Reconstruction of Narva bridge with border crossing improvements:
project* feasibility study and project preparation.
Description of the
problem/challenge E20 Tallinn-Narva road is part of the EU TEN-T road network. E20
for the cross- Tallinn-Narva-St-Petersburg road is also part of United Nations E-
border region road network connecting UK, Scandinavia, Baltic States and North-
West Russia:
https://en.wikipedia.org/wiki/European_route_E20
E20 Tallinn-Narva road completeness to EU TEN-T road safety and
environmental standards is 42% (covering 88 km of 2+2 road
sections of 209 km in total).
Bridge over Narva river remains the weakest link of E20 Tallinn-
Narva-St.Petersburg road due to major safety concern of 60 years old
bridge with insufficient load-carrying capacity and deteriorated
structures. The existing bridge was constructed in 1960 following 18
tons design load while 44 tons trucks are allowed to pass the bridge.
1+1 lane bridge is a reinforced concrete structure of 162 m in length
and 17 m in width. Deterioration of bridge structures is increasing by
the severe impact of heavy traffic with dynamic and static loads
forced to stay on the bridge before entering border controls. Bridge
substructure and pavement was renovated in 2011 without
strengthening:
https://www.mnt.ee/et/ehitus/narva-sopruse-silla-remont
The service life of the existing bridge is expiring by 2030…2035.
Delay with the reconstruction of Narva bridge puts E20 Tallinn -
Narva - St.Peterburg road transport connection and cross-border
cooperation at risk as no alternative bridge crossing exists over Narva
river. In case of a serious failure of Narva bridge alternative routes
are with 400…500 km detour via Finland or South-East Estonia
border crossings via Pskov. Major reconstruction with the
strengthening of the bridge is not possible without major disturbance
to pedestrian and car traffic.
Bridge asphalt pavement was repaired 2019-2020. Frequent cracking
of bridge pavement is the consequence of structural weaknesses of
the whole bridge.
The Government of Estonia has decided to finalise construction of
Tallinn-Narva 2+2 expressway by the end of 2038. Tallinn-Narva
2+2 expressway together with the new bridge over Narva river
supports developments both cross-border regions and the wider
economy.
Potential project Estonian Transport Administration, Estonian Police and Border
partner(s) Guard Board, corresponding agencies of the Russian Federation,
Rosavtodor
Russian Ministry of Transport agreed with Terms of Reference of
Narva/Ivangorod border improvement project preparations, ref. letter
29.05.2018 nr 9-607
Project activities –
short description Technical assistance for preparation of reconstruction of Narva
and location bridge and improvement of border crossing
Feasibility study and cost-benefit analysis phase
preparation of feasibility study. The following alternatives to
be assessed: replacement of the existing bridge, widening and
strengthening of existing bridge, construction of a new
parallel bridge (with a similar architecture) and reconstruction
of existing bridge (indicative cost 10 million €, construction
2031-2032). Narva/Ivangorod northern bypass alternative
(indicative cost 125 million € including new border control
facilities) of 22 km in length to be assessed with a
construction period of 2050+
scope of preliminary studies: traffic analysis, geology,
mapping, river hydrology, bridge architecture, archaeology
and necessary heritage studies related nearby Narva and
Ivangorod castle, improvement of border and controls,
obtaining technical and environmental requirements, zoning
decisions, preliminary costing
cost-benefit analysis of different alternatives (including
assessment of economic impacts to Narva/Ivangorod region),
selection of preferred alternative
Preliminary design and environmental impact assessment phase
environmental impact assessment
preparation necessary amendments to zoning decisions,
assistance in public hearings
conducting necessary supplementary studies of mapping,
geotechnical surveys, hydrology and riverbed studies,
environment, bridge and road conditions assessment
preparation of preliminary designs (including architectural
designs)
designs of environmental mitigation measures
preparation of cost estimates (including land purchase, design
and supervision costs. construction and maintenance costs,
environmental mitigation measures)
assistance in preparations of funding applications for
construction works
preparation necessary land purchase documentation
preparation of tender documents for construction works
getting approvals from Estonian and Russian authorities and
parties concerned
obtain construction permits from Estonian and Russian
authorities
Project outputs Preparation of reconstruction of Narva bridge and approaches with a
service life of 100 years to fulfil Estonian and Russian bridge safety
and environment requirements. Implementation of the project
necessary to ensure connectivity E20 Tallinn-Narva-St.Peterburg
road connection both for local and international transport and cross-
border areas. Design, environmental impact assessment, tender
documents for works approved, construction permits obtained from
Estonian and Russian authorities.
Reconstruction works of Narva bridge are to be carried out 2031-
2032 (within a separate project)
Estimated project 1 million € incl
budget (EUR) in 0,4 million € feasibility study with the cost-benefit analysis
total and by phase
partner 0,6 million € preliminary design, environmental impact
assessment, tender documents for the construction phase
Contact Estonian Transport Administration
information
* Field can be left empty
Priidu Ristkok Teie 24.11.2020 nr 9.2-13.5.20/8151-1
Rahandusministeerium
[email protected] Meie 18.12.2020 nr 1.1-16/20-0007/7164-5
Suur-Ameerika 1
10122, Tallinn
Suuremahuliste infrastruktuuriprojektide ideed
Eesti-Vene 2021-2027 programmiks
Austatud Priidu Ristkok
Täname Teid päringu eest seoses suuremahuliste infrastruktuuriprojektide rahastamise
võimalusega Eesti-Vene piiriülese koostöö programmist 2021-2027. Majandus- ja
Kommunikatsiooniministeeriumi poolt palume kaaluda kolme projekti lisamist kavandatavasse
koostööprogrammi:
1. Kontaktvõrgu väljaehitamine raudteelõigul Narvast Kingissepani
Eesti Raudtee elektrifitseerib raudteelõiku Tapast kuni Narva raudteejaamani 2025. aasta lõpuks.
Seejärel jääb ida suunas elektrifitseerimata vaid 35 km raudteed, mis takistab elektrirongide
kasutuselevõttu St. Peterburi ja Tallinna vahel nii reisijate- kui kaubaveol.
Kontaktvõrgu väljaehitamise maksumus raudteelõigul Narvast Kingissepani on 15 mln eurot.
Projekti saab teostada koostöös Oktoobriraudteega, kellega toimus sellekohane kirjavahetus
viimati 2020.a suvel.
2. Narva silla rekonstrueerimiseks tasuvusanalüüsi läbiviimine ja ehitusprojekti koostamine
Sild üle Narva jõe E20 Tallinn-Narva-Peterburi maanteel on 60 aastat vana, silla läbilaskevõime
on ammendumas ja konstruktsioonid amortiseerumas.
Olemasoleva silla kasutusiga lõpeb 2030-2035, rekonstrueerimisega viivitamine seab E20 Tallinn-
Narva-Peterburi maanteetranspordiühenduse ja piiriülese koostöö ohtu, kuna ümbersõidu
võimalused praktiliselt puuduvad – liiklus tuleks suunata 400…500 km ümbersõidule Kagu-Eesti
või Soome kaudu.
Projekti käigus analüüsitakse Narva silla rekonstrueerimise variandid (olemasoleva silla
asendamine, laiendamine või uue paralleelsilla ehitamine vahetult oleva silla kõrvale), teostatakse
vajalikud uuringud ning valmistatakse ette eelprojekt. Projekti eelarve kokku on 1 mln eurot.
Narva silla rekonstrueerimistöid teostatakse aastatel 2031-2032 eraldi projekti raames.
Suur-Ameerika 1 / 10122 Tallinn / 625 6342 /
[email protected] / www.mkm.ee
Registrikood 70003158
3. Koidula – Kunitšina Gora piiripunktis asuva maanteesilla rekonstrueerimine
Olemasolev maanteesild on amortiseerunud ning võttes arvesse silla praegust ja võimalikku
tulevast liikluskoormust, samuti jalakäijate liiklussagedust, on liiklejate ohutuse tagamiseks
vajalik silla rekonstrueerimine.
Uue maanteesilla projektlahendus on alles ideetasandil ja selle täpsem lahendus sõltub Vene
Föderatsiooni seisukohtadest. Uus maanteesild võimaldab suurendada piiriülest läbilaskevõimet
ja parandada ka liiklusohutust tänu jalakäijate eraldamisele autoliiklusest.
Projekteerimistööd peaks kavandama aastatele 2021–2022 ning seejärel, järgneks ehitushanke
läbiviimine aastatel 2023-2024, arvestades Vene Föderatsiooni seisukohti ning
koostööprogrammi võimalusi. Projekti eelarve 700 000 eurot.
Kirjale on lisatud täidetud projektiideede vormid.
Lugupidamisega
(allkirjastatud digitaalselt)
Ahti Kuningas
transpordi asekantsler
Inna Nosach
625 6335
[email protected]
2 (2)