dokumendiregister.ee
OtsingAsutusedMCP
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel
Otsing›Majandus- ja Kommunikatsiooniministeerium
Sissetulev kiriAvalik

Kiri

Majandus- ja Kommunikatsiooniministeerium · 23. november 2020
Viit
24.1-8/2020/7140-1
Registreeritud
23. november 2020
Dokumendi liik
Sissetulev kiri
Adressaat
EU Council Presidency Secretariat of the Federal Ministry of Transport and Digital Infrastructure
Saabumis/saatmisviis
e-post
Funktsioon
24.1 EL ja rahvusvahelise koostöö korraldamine
Sari
24.1-8/S Tervitus- ja tutvustuskirjad, kutsed ja kirjavahetus seminaridel, konverentsidel jt üritustel osalemiseks (Arhiiviväärtuslik)
Toimik
24.1-8/2020
Vastutaja
Yana Laurand (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Euroopa Liidu ja rahvusv koostöö osakond)
Lahendamise tähtaeg
23. detsember 2020

Failid

  • 📎Draft Letter of Intent.doc88 KB
  • 📎E-kiri.pdf74 KB
  • 📎Entwurf Letter of Intent.docx77 KB
  • 📎Konzeptstudie TTE 2.0.pdf4729 KB
  • 📎Ministerschreiben_TEE2.pdf2749 KB
  • 📎TEE 2.0 Blueprint Study.pdf4656 KB
  • 📎Translation.pdf132 KB

Sisu (failidest)

2.0 – Grenzüberschreitender Hochgeschwindigkeits- und Nachtverkehr auf der Schiene für den Klimaschutz Geschäftsstelle des Beauftragten der Bundesregierung für den www.bmvi.de Schienenverkehr (GS-BSV) Gliederung 1. Allgemeine Einleitung 2. Konzeptstudie TEE-Linien 3. Konzeptstudie Nachtzüge 4. Zusammenfassung und Fazit www.bmvi.de | 21. September 2020 2 Gliederung 1. Allgemeine Einleitung 2. Konzeptstudie TEE-Linien 3. Konzeptstudie Nachtzüge 4. Zusammenfassung und Fazit www.bmvi.de | 21. September 2020 3 Gesellschaftlicher Wandel im Reiseverhalten – Erweiterung des Kundenkreises Veränderung der Verkehrsmittelwahl aufgrund Effekten wie • mehr Klimabewusstsein („Flugscham“) • Verkürzung der Reisezeiten dank wachsender Hochgeschwindigkeitsnetze • Direkte Anbindung kleinerer Städte, die am Laufweg der Magistralen liegen Chance für eine neue Botschaft der Eisenbahn – ein neues TEE-Netz Schnellfahrende Züge über große Entfernungen (mit Zügen durch 4, aber mindestens 3 Länder). Der TransEuropExpress 2.0, kurz TEE 2.0, ist damit ein Symbol für den Zusammenhalt und das weitere Zusammenwachsen in Europa. Chance aus dem Deutschlandtakt heraus Der TEE 2.0 und ein attraktiver Nachtverkehr lässt sich im Deutschlandtakt integrieren und verbraucht keine Trassen auf Kosten des Güterverkehrs www.bmvi.de | 21. September 2020 4 Taktfahrplankonzepte wie der Deutschlandtakt bilden die Grundlage eines neuen TEE-Netzes Züge sind bereit zur Abfahrt (00) Abfahrt in den Umsteigebahnhöfen (05) • „Öfter – schneller – überall“: Der Deutschlandtakt etabliert ein neues, transparentes Prinzip des Ausbau- und Kapazitätsmanagements. Ankunft in den Umsteigebahnhöfen (55) Züge sind bereit zur Abfahrt (00) • Für alle Verkehrsarten stehen reservierte Kapazitäten zur Verfügung, die gute Anschlüsse im Personenverkehr und verlässliche Trassen im Güterverkehr gewährleisten. Basis ist ein Taktsystem im Stunden- oder Halbstundenrhythmus. • Fahrplanbasiert abgeleitete Infrastrukturmaßnahmen machen das Gesamtnetz deutlich leistungsfähiger und erhöhen die landesweite Systemgeschwindigkeit spürbar. • Zahlreiche Nachbarländer wenden derartige Planungsmethoden an bzw. verfügen bereits über ein hochfrequentes Netz an Fernzügen. • Der TEE 2.0 verknüpft die jeweils landesweit optimierten Systeme bestmöglich zu einem europäischen Angebot, um die internationalen Reisezeiten zu verkürzen www.bmvi.de | 21. September 2020 5 Analyse der Situation und Konzeption des Netzes für den TEE 2.0 in Europa • Identifikation von heute mit der Eisenbahn nur ungenügend bedienten Relationen (bestehende Linien werden nicht in Frage gestellt) • Entwicklung internationaler Linien, die den europäischen Gedanken aufnehmen und folgende Ziele haben: Quelle: http://www.spiekermann-wegener.com/mod/time/time.htm • Verknüpfung nationaler schneller Linien zu internationalen Linien mit hoher Nachfragewirkung bei möglichst geringem zusätzlichen Trassenverbrauch in den jeweiligen Binnennetzen • Aufzeigen der Chancen und Risiken und des Handlungsbedarfs • Markante Reisezeitverkürzung und das Aufheben von Umsteigerestriktionen • Aufzeigen der jeweiligen technischen und fahrplantechnischen Herausforderungen der identifizierten Linien • Ableiten von Infrastrukturmaßnahmen und Aufzeigen möglicher Fahrzeugkonzepte für die identifizierten Linien www.bmvi.de | 21. September 2020 6 Ergänzende Arbeitsschritte für die Konzeption eines europäischen Nachtzug-Netzes Ziele für die Konzeption eines europäischen Nachtzug-Netzes • Aufzeigen möglicher Fahrzeug- und Produktionskonzepte für die identifizierten Linien • Aufzeigen der erforderlichen Planungsschritte für das weitere Vorgehen Planungsgrundlagen für Nachtzug-Linien • maximale Höchstgeschwindigkeit 160 – 230 km/h (Talgo: 250km/h) • Gutlaufende vorhandene Nachtzüge (Österreich / Schweiz – Deutschland) werden nicht neu thematisiert, sondern es wird davon ausgegangen, dass sie weiterentwickelt und weiterbetrieben werden Quelle: https://blog.oebb.at/die-nightjets-der-neuen-generation/ Die Entwicklung zusätzlicher Nachtzüge ist zu begrüßen, deren wirtschaftliche Herausforderung ist aber nicht zu unterschätzen: Schlafplätze können nur einmal pro Fahrt verkauft werden, während im TEE 2.0 ein Sitzplatz für EuroNight Teilrelationen mehrfach vermarktet werden kann. Zudem ist der Platzbedarf pro Fahrgast deutlich größer. www.bmvi.de | 21. September 2020 7 Herausforderungen für international durchgebundene Linien • Unterschiedliche Strom- und Zugsicherungssysteme • Nach wie vor sehr nationale Fokussierung der Bahnverwaltungen • Einheitliche Vertriebs- und Tarifgestaltung unter Berücksichtigung der Fahrgastrechte stellt eine Herausforderung dar • Unterschiedliche Anforderungen an eine Reservierungspflicht und damit Sitzplatzgarantie • Differierende Regelungen zu Konzessionierungen, Verkehrsverträgen und Subventionierungen • Verschiedene Sprachen und Betriebsregeln der Nachbarländer • Unterschiedliche technische Feinheiten und Qualitätsniveaus: • Anspruch an Haltepolitik • Gewinnerwartung vs. Service public • Unterschiedliche Betreiberformen www.bmvi.de | 21. September 2020 8 Gliederung 1. Allgemeine Einleitung 2. Konzeptstudie TEE-Linien 3. Konzeptstudie Nachtzüge 4. Zusammenfassung und Fazit www.bmvi.de | 21. September 2020 9 Das TEE-Netz wird in zwei Phasen umgesetzt TEE 1 / TEE 2 Kurzfristige Umsetzung Umsetzung mit Inbetriebnahme Stockholm Paris – Brüssel – Köln – Berlin – Warschau wichtiger Infrastrukturen TEE 3 / TEE 4 Amsterdam – Köln – Basel – Mailand – Rom Kopenhagen TEE 5 / TEE 6 Feste Fehmarnbelt Querung Berlin – Frankfurt – Lyon – Lübeck Montpellier – Barcelona Hamburg TEE 7 / TEE 8 Amsterdam Hannover Berlin Warschau Amsterdam Bremen Berlin Warschau Amsterdam – Brüssel – Paris – Hannover Lyon – Barcelona Brüssel Brüssel Köln Köln Frankfurt Frankfurt Karlsruhe Karlsruhe TEE 9 / TEE 10 Paris Freiburg Paris Freiburg München Wien Mulhouse Mulhouse Stuttgart 21 Berlin – München – Innsbruck Basel Basel Salzburg Budapest Brenner – Bologna – Rom Basistunnel TEE 11 / TEE 12 Lyon Mailand Lyon Mailand Paris – Strasbourg – Stuttgart Bologna Bologna – München – Wien – Budapest Montpellier Montpellier TEE 13 / TEE 14 Perpignan Perpignan Paris – Brüssel – Hamburg – Rom Rom Kopenhagen – Stockholm Barcelona Barcelona TEE 15 / TEE 16 Stockholm – Kopenhagen – Berlin – München www.bmvi.de | 21. September 2020 10 10 2. UMSETZUNGS- Die zweite Phase des TEE-Netzes nutzt im Bau STUFE befindliche wichtige Infrastrukturausbauten TEE 9 / TEE 10 Umsetzung mit Inbetriebnahme Stockholm Anbindung von Skandinavien Berlin – München – Innsbruck – Bologna – Rom wichtiger Infrastrukturen Mit der Inbetriebnahme der festen TEE 11 / TEE 12 Fehmarnbeltqerung zwischen Deutschland Paris – Strasbourg – Stuttgart (Puttgarden) und Dänemark (Rødbyhavn) – München – Wien – Budapest TEE 13 / TEE 14 Kopenhagen kann die Reisezeit auf dieser Relation Paris – Brüssel – Hamburg – Feste Fehmarnbelt Querung Lübeck reduziert werden. Kopenhagen – Stockholm Hamburg TEE 15 / TEE 16 Bremen Berlin Ost-West-Korridor über Süddeutschland Amsterdam Warschau Stockholm – Kopenhagen – Berlin – München Hannover Die Relation Paris – Budapest profitiert von Brüssel Köln Stuttgart 21 und der Neubaustrecke Frankfurt Karlsruhe Stuttgart – Ulm indem einerseits der Paris Mulhouse Freiburg Stuttgart 21 München Wien Richtungswechsel entfällt und andererseits Basel Brenner Salzburg Basistunnel Budapest die Reisezeit verkürzt werden kann. Lyon Mailand Basistunnel auf der Brenner-Achse Montpellier Bologna Mit dem Brenner-Basistunnel kann auf der Perpignan Relation Berlin – München – Rom ebenfalls Barcelona Rom über weite Teile mit Hochgeschwindigkeit gefahren werden und die Attraktivität steigt. www.bmvi.de | 21. September 2020 11 11 D-TAKT- Zentrale langfristige Infrastrukturmaßnahmen des INFRASTRUKTUR Deutschlandtaktes zur Beschleunigung des TEE in D Die kurzfristig umsetzbaren Linien werden langfristig durch die folgenden Infrastrukturmaßnahmen signifikant beschleunigt: – Hannover – Bielefeld – Hamm – Karlsruhe – Basel (Rheintalbahn) – Mannheim – Erfurt (inkl. Fernbahntunnel Frankfurt) www.bmvi.de | 21. September 2020 12 12 Mit den Zügen des TEE 2.0 reisen Sie direkt in die europäischen Hauptstädte Kurzfristige Umsetzung Umsetzung mit Inbetriebnahme wichtiger Infrastrukturen TEE 1/2: Paris – Brüssel – Köln – Berlin – Warschau TEE 9/10: Berlin – München – Innsbruck – Bologna – Rom TEE 3/4: Amsterdam – Köln – Basel – Mailand – Rom TEE 11/12: Paris – Stuttgart – München – Wien – Budapest TEE 5/6: Berlin – Frankfurt – Lyon – Barcelona TEE 13/14: Paris – Brüssel – Hamburg – Stockholm TEE 7/8: Amsterdam – Brüssel – Paris – Lyon – Barcelona TEE 15/16: Stockholm – Kopenhagen – Berlin – München www.bmvi.de | 21. September 2020 13 GRUNDLAGEN Bereits heute gibt es Rollmaterial, das in vielen ROLLMATERIAL Ländern Europas einsetzbar ist Mindestanforderung 300 km/h Viele europäische Hochge- schwindigkeitsnetze sind auf eine Geschwindigkeit von rund 300 km/h ausgelegt. Fahrzeugkonzepte, die diese Bezeichnung TGV Euroduplex und Velaro und ähnliche Zefiro 380 und ähnliche Smile / Giruno Schwelle nicht erreichen, sind ähnliche aus diesem Grund in der nebenstehenden Tabelle nicht Hersteller Alstom Siemens Bombardier / Hitachi Rail Stadler berücksichtigt. Länderzulassung FR X (diverse BR) X (BR 406/407) X (Frecciarossa 1000) Hochgeschwindigkeit in DE X (TGV POS) X (diverse BR) (X) (perspektivisch) Osteuropa BE X (diverse BR, Thalys) X (BR 406/407, Eurostar) In Tschechien und Polen verkehren heute Pendolino- NL X (Thalys, einstöckig!) X (BR 406/407, Eurostar) Züge, welche mit einer ESP X (TGV Duplex) X (Velaro ESP) Höchstgeschwindigkeit von 230 km/h bzw. 250 km/h verkehren CH X (TGV Lyria) X können. AT X (diverse BR) (X) (perspektivisch) IT X (Frecciarossa 1000) (X) (perspektivisch) PO HU DK SWE Höchstgeschwindigkeit 320 km/h 350 km/h (Velaro ESP) 360 km/h 250 km/h (evtl. 300 km/h) BR = Baureihe www.bmvi.de | 21. September 2020 14 14 Betreiber: Gründung einer Gesellschaft für den Betrieb des neuen TEE-Netzes Vorschlag Gründung einer Gesellschaft z. B. durch SNCF und DB, an der sich weitere interessierte und ambitionierte Bahnen (z.B. NS, ÖBB, SBB) beteiligen können. Diese Gesellschaft wird als eigenständiges EVU zugelassen, kauft für die Produktion jedoch Dienstleistungen bei den Muttergesellschaften ein. Chancen dieses Vorschlags • Nutzung der nationalen Kenntnisse der einzelnen Gesellschafter • Kein eigenes Personal für die Durchführung der Verkehre erforderlich • Einbringen der länder- und fahrzeugspezifischen Erfahrungen für die Fahrzeugzulassung • Nutzung von vorhandenem Rollmaterial für einen kurzfristigen Start des TEE-Netzes • Symbol für die Europäische Zusammenarbeit www.bmvi.de | 21. September 2020 15 Gliederung 1. Allgemeine Einleitung 2. Konzeptstudie TEE-Linien 3. Konzeptstudie Nachtzüge 4. Zusammenfassung und Fazit www.bmvi.de | 21. September 2020 16 NACHTZUG-NETZ Modernes Rollmaterial für Nachtzugverkehre ist am Markt erhältlich – 2 Beispiele Beschaffung neuer Nachtzug-Kompositionen durch die ÖBB Schlafwagen für Aserbaidschan Quelle: https://www.nightjet.com/de/komfortkategorien/nightjetzukunft Hersteller: Siemens Quelle: www.bahnonline.ch Hersteller: Stadler www.bmvi.de | 21. September 2020 17 17 EuroNight-Nachtnetz bestehend aus 8 Linien davon 2 mit mittelfristiger Verlängerungsoption 21 / 22 Kurzfristige Umsetzung Anpassung mit Inbetriebnahme Stockholm Paris – Brüssel – Köln – Berlin wichtiger Infrastrukturen 23 / 24 Brüssel – Köln – Berlin – Prag/Warschau 25 / 26 Kopenhagen Kopenhagen Amsterdam – Köln – Basel – Mailand – Venedig/Genua Feste Fehmarnbelt Querung Lübeck 27 / 28 Hamburg Hamburg Frankfurt – Strasbourg/Zürich – Berlin Berlin Hannover Hannover Mulhouse – Lyon – Montpellier Amsterdam Warschau Amsterdam – Barcelona Brüssel Dresden Brüssel Köln Dresden Köln 29 / 30 Prag Berlin – München – Innsbruck – Prag Frankfurt Bologna – Rom/Nizza Karlsruhe Breclav Breclav Paris Strasbourg München Paris 31 / 32 Mulhouse Wien Wien Salzburg Budapest Budapest Paris – Strasbourg – Stuttgart – Basel Zürich Innsbruck München – Wien – Budapest/ Villach Zagreb Lyon Verona Ljubljana Zagreb Mailand Venedig 33 / 34 Genua Bologna Paris – Brüssel/Amsterdam – Montpellier Nizza Hamburg – Kopenhagen – Stockholm* Perpignan Rom 35 / 36 Barcelona Stockholm* – Kopenhagen – Berlin – Prag – Wien/Budapest *ohne feste Fehmarnbelt- www.bmvi.de | 21. September 2020 18 18 querung nur bis Kopenhagen (siehe Unterteilung in A und B) Gliederung 1. Allgemeine Einleitung 2. Konzeptstudie TEE-Linien 3. Konzeptstudie Nachtzüge 4. Zusammenfassung und Fazit www.bmvi.de | 21. September 2020 19 Fazit und nächste Schritte • Bereits mit der heutigen Infrastruktur und dem heutigen Fahrplanangebot lassen sich attraktive Angebote gestalten. • Für Geschäfts- und Privatreisende könnten diese Angebote sehr zeitnah eine klimafreundliche Alternative zum Flugverkehr darstellen. • Da für die Umsetzung „lediglich“ eine Abstimmung zwischen den EVUs hinsichtlich Fahrplänen, Zulassungsfragen, Durchbindung von Zügen sowie Tarifen erforderlich ist, erscheint eine zeitnahe Umsetzung denkbar. • Eine Moderation durch die EU-Mitgliedsstaaten als Eigentümer der EVUs bzw. Regulierungsbehörden erscheint hinsichtlich der raschen Umsetzung hilfreich. • Durch die Realisierung der für den Zielfahrplan Deutschlandtakt vorgesehenen Infrastrukturmaßnahmen lassen sich im Zentrum des europäischen Netzes bedeutende Fahrzeitreduktionen und Angebotsverbesserungen realisieren, die sich unmittelbar positiv auf das neue Konzept TEE 2.0 auswirken. www.bmvi.de | 21. September 2020 20 Detaildarstellungen der Linien www.bmvi.de | 21. September 2020 21 TEE 1/2 Paris – Brüssel – Köln – Berlin – Warschau Frankreich Betrachtung einer Richtung Paris Gare du Nord Die nachfolgenden Folien LGV Nord beschreiben das Konzept anhand einer Fahrtrichtung. Die Brüssel Belgien Ausführungen gelten analog HSL 2 auch für die Gegenrichtung. Die Gegenrichtung verkehrt in der Lüttich Tagessymmetrie 14 Uhr. HSL 3 Aachen Hbf Basis: 1 tägliches Zugpaar Bestandsstrecke Berlin Basis für die Überlegungen Hannover Warschau SFS Düren – Köln bildet die Annahme eines Köln Hbf Deutschland Perspektive im Zielfahrplan täglichen Zugpaars für jede Bestandsstrecke Brüssel Deutschland Takt Linie. Köln Hannover Hbf Inbetriebnahme der SFS Bestandsstrecke Hamm – Hannover Zugrundeliegende Infrastruk- SFS Wolfsburg – Berlin Paris tur Berlin Hbf Das Konzept für die Züge TEE Bestandsstrecke 1/2 basiert auf der heutigen Infrastruktur. Frankfurt (Oder) Bestandsstrecke Streckengeschwindigkeit Posen Polen Bestandsstrecke 300 km/h Warschau 250 km/h bis 200 km/h Konzept TEE 2.0 | 27.01.2020 | SMA 22 TEE 1/2 Anbindung von Frankreich und Belgien Toulouse, Abfahrt: 22:20 Uhr (Ankunft: 06:52 Uhr) Briançon, Abfahrt: 20:03 Uhr (Ankunft 06:55 Uhr) (Transfer in Paris) Paris Gare du Nord, 9:00 Uhr London, Abfahrt: 07:16 Uhr (Ankunft: 10:12 Uhr) Rotterdam, Abfahrt: 08:58 Uhr (Ankunft: 10:08 Uhr) Brügge, Abfahrt: 09:10 Uhr (Ankunft: 10:07 Uhr) Gent, Abfahrt: 09:39 Uhr (Ankunft: 10:07 Uhr) Brüssel, 10:30 Uhr Lüttich, Namur: 10:18 Uhr (Ankunft: 11:09 Uhr) 11.15 Uhr Aachen 11:40 Uhr Köln 12.15 Uhr Anschluss von/nach Nachtzuglinie Konzept TEE 2.0 | 27.01.2020 | SMA 23 TEE 1/2 Anbindung von Deutschland und Polen Hamburg, Ankunft: 16:30 Uhr Hannover, 15 Uhr Berlin,16:45 Uhr Dresden, Ankunft: 19:07 Uhr Prag, Ankunft: 21:36 Uhr Frankfurt (Oder), 17:45 Uhr Posen, 19:30 Uhr Breslau, Ankunft: 22:10 Uhr Danzig, Ankunft: 22:56 Uhr Warschau, 22:15 Uhr Krakau, Ankunft: 00:50 Uhr Zakopane, Ankunft: 05:50 Uhr Anschluss von/nach Nachtzuglinie Konzept TEE 2.0 | 27.01.2020 | SMA 24 TEE 1/2 Weitere Verbesserung der Anbindung von Frankreich und Belgien im Deutschlandtakt Toulouse, Abfahrt: 22:20 Uhr Briançon, Abfahrt: 20:03 Uhr Bordeaux, Abfahrt: 05:45 Uhr (Transfer in Paris) Paris Gare du Nord, 9:00 Uhr London, Abfahrt: 07:16 Uhr Rotterdam, Abfahrt: 08:58 Uhr Brügge, Abfahrt: 09:25 Uhr Brüssel, 10:30 Uhr Gent, Abfahrt: 09:55 Uhr Lüttich, Namur: 10:18 Uhr 11.15 Uhr Aachen 11:40 Uhr Köln 12.15 Uhr Anschluss von/nach Nachtzuglinie Konzept TEE 2.0 | 27.01.2020 | SMA 25 TEE 1/2 Weitere Verbesserung der Anbindung von Deutschland und Polen im Deutschlandtakt Hamburg, Ankunft: 15:45 Uhr Magdeburg, Ankunft: 15:55 Uhr Hannover, 14:30 Uhr Leipzig, Ankunft: 17:15 Uhr Dresden, Ankunft: 17:30 Uhr Berlin,16:15 Uhr Stettin, Ankunft: 17:30 Uhr Prag, Ankunft: 19:00 Uhr Frankfurt (Oder), 17:15 Uhr Breslau, Ankunft: 22:10 Uhr Posen, 19:00 Uhr Danzig, Ankunft: 22:56 Uhr Warschau, 21:45 Uhr Krakau, Ankunft: 00:50 Uhr Anschluss von/nach Nachtzuglinie Zakopane, Ankunft: 05:50 Uhr Konzept TEE 2.0 | 27.01.2020 | SMA 26 TEE 1/2 Eine Direktverbindung Paris – Warschau ist mit einer Reisezeit von 13h und 15 Minuten kurzfristig möglich Heute TEE-Netz TEE-Netz (Zielfahrplan) – Fahrzeit: 15h31 – Fahrzeit: 13h15 – Fahrzeit: 12h45 – Umsteigevorgänge: 2 – Direktverbindung – Direktverbindung – Umstieg in Köln – SFS Hamm – Hannover – Umstieg in Berlin und Hannover – Berlin 300 km/h 09:00 TEE 1 09:00 TEE 1 22:15 21:45 gratis WLAN an Bord gratis WLAN an Bord gratis Bordunterhaltungssystem gratis Bordunterhaltungssystem Speiswagen und Catering am Platz verfügbar Speiswagen und Catering am Platz verfügbar Sitze in Fahrtrichtung Sitze in Fahrtrichtung Konzept TEE 2.0 | 27.01.2020 | SMA 27 TEE 3/4 Amsterdam – Köln – Basel – Mailand – Rom Niederlande Betrachtung einer Richtung Amsterdam Die nachfolgenden Folien beschreiben das Konzept Bestandsstrecke anhand einer Fahrtrichtung. Die Köln Messe/Deutz Ausführungen gelten analog SFS Köln – Frankfurt auch für die Gegenrichtung. Die Gegenrichtung verkehrt in der Frankfurt Flughafen Deutschland Tagessymmetrie 14 Uhr. Perspektive im Zielfahrplan Bestandstrecke Deutschland Takt Mannheim NBS Frankfurt – Mannheim Basis: 1 tägliches Zugpaar SFS Mannheim – Graben-Neudorf Basis für die Überlegungen Amsterdam Bestandsstrecke Durchgehende SFS zwischen bildet die Annahme eines Karlsruhe Karlsruhe und Basel täglichen Zugpaars für jede Bestandsstrecke Köln Linie. Frankfurt Basel Bad Bahnhof Zugrundeliegende Infrastruk- Bestandsstrecke Schweiz Karlsruhe tur Freiburg Aarau Das Konzept für die Züge TEE Basel Bestandsstrecke sowie Gotthard- und Ceneri-Basistunnel 3/4 basiert auf der Infrastruktur per Ende 2020 (Inbetriebnahme Lugano Ceneri Basistunnel). Mailand Bestandsstrecke Bologna Italien Mailand Lambrate Streckengeschwindigkeit SFS Milano – Roma 300 km/h Perpignan Rom Roma Termini 250 km/h Nicht alle Zwischenhalte dargestellt bis 200 km/h Konzept TEE 2.0 | 27.01.2020 | SMA 28 TEE 3/4 Anbindung von Holland und Deutschland Zandvoort, Abfahrt: 07:34 Uhr (Ankunft: 08:05 Uhr) Den Haag, Abfahrt: 07:03 Uhr (Ankunft: 07:55 Uhr) Amsterdam, 8:15 Uhr Bruxelles-Midi, Abfahrt: 08:23 Uhr (Ankunft: 10:15 Uhr) Emden, Abfahrt: 06:34 Uhr (Ankunft: 10:15 Uhr) Köln Messe/Deutz, (Transfer in Köln) 10:45 Uhr Frankfurt Flughafen, 11:45 Uhr Nürnberg, Abfahrt: 09:42 Uhr (Ankunft: 12:53 Uhr) Karlsruhe, 13:00 Uhr Basel Bad Bf, 15:00 Uhr Konzept TEE 2.0 | 27.01.2020 | SMA 29 TEE 3/4 Anbindung von der Schweiz und Italien Aarau, 15:30 Uhr Zürich, Ankunft: 16:00 Uhr Arth-Goldau, Zürich, Abfahrt: 15:40 Uhr 16:15 Uhr Luzern, Abfahrt: 15:40 Uhr Bellinzona,17:15 Uhr Locarno, Ankunft: 17:42 Uhr Lugano, 17:30 Uhr Mailand Lambrate, 18:45 Uhr Turin, Ankunft: 20:38 Uhr Venezia, Ankunft: 21:55 Uhr (Transfer in Mailand) Bologna, 19:45 Uhr Florenz Campo di Marte, 20:30 Uhr Napoli, Ankunft: 23:15 Uhr Siracusa, Ankunft: 11:30 Uhr Rom, 22:00 Uhr Palermo, Ankunft: 12:00 Uhr Anschluss von/nach Nachtzuglinie Konzept TEE 2.0 | 27.01.2020 | SMA 30 TEE 3/4 Weitere Verbesserung der Anbindung von Holland und Deutschland im Deutschlandtakt Zandvoort, Abfahrt: 07:49 Uhr Den Haag, Abfahrt: 07:33 Uhr Amsterdam, 8:30 Uhr Bruxelles-Midi, Abfahrt: 08:23 Uhr Emden, Abfahrt: 06:35 Uhr Köln Messe/Deutz, (Transfer in Köln) 11:00 Uhr Frankfurt Flughafen, 12:00 Uhr Nürnberg, Abfahrt: 09:37 Uhr Karlsruhe, 13:00 Uhr Basel Bad Bf, 14:30 Uhr Konzept TEE 2.0 | 27.01.2020 | SMA 31 TEE 3/4 Weitere Verbesserung der Anbindung von der Schweiz und Italien im Deutschlandtakt Aarau, 15:00 Uhr Zürich, Ankunft: 15:50 Uhr Arth-Goldau, Zürich, Abfahrt: 15:10 Uhr 15:45 Uhr Luzern, Abfahrt: 15:18 Uhr Bellinzona,16:45 Uhr Locarno, Ankunft: 17:12 Uhr Lugano, 17:00 Uhr Mailand Lambrate, 18:15 Uhr Turin, Ankunft: 20:38 Uhr Venezia, Ankunft: 21:55 Uhr (Transfer in Mailand) Bologna, 19:15 Uhr Rimini, Ankunft: 21:12 Uhr Florenz Campo di Marte, 20:00 Uhr Napoli, Ankunft: 23:03 Uhr Siracusa, Ankunft: 11:30 Uhr Rom, 21:30 Uhr Palermo, Ankunft: 12:00 Uhr Anschluss von/nach Nachtzuglinie Konzept TEE 2.0 | 27.01.2020 | SMA 32 TEE 3/4 Eine Direktverbindung Amsterdam – Rom ist mit einer Reisezeit von 13h und 45 Minuten kurzfristig möglich Heute TEE-Netz TEE-Netz (Zielfahrplan) – Fahrzeit: 16h02 – Fahrzeit: 13h45 – Fahrzeit: 13h00 – Umsteigevorgänge: 4 – Direktverbindung – Direktverbindung – NBS Frankfurt – Mannheim – Durchgehende SFS Karlsruhe – Basel 08:15 TEE 3 08:30 TEE 3 22:00 22:15 21:30 22:15 gratis WLAN an Bord gratis WLAN an Bord gratis Bordunterhaltungssystem gratis Bordunterhaltungssystem Speiswagen und Catering am Platz verfügbar Speiswagen und Catering am Platz verfügbar Sitze in Fahrtrichtung Sitze in Fahrtrichtung Konzept TEE 2.0 | 27.01.2020 | SMA 33 TEE 5/6 Berlin – Frankfurt – Lyon – Montpellier – Barcelona Berlin VDE 8.3 Betrachtung einer Richtung Halle Die nachfolgenden Folien VDE 8.2 beschreiben das Konzept Erfurt Perspektive im Zielfahrplan anhand einer Fahrtrichtung. Die Bestandsstrecke Deutschland Takt Deutschland Ausführungen gelten analog Frankfurt Süd Inbetriebnahme NBS Fulda – auch für die Gegenrichtung. Die Frankfurt – Mannheim inkl. Bestandsstrecke Gegenrichtung verkehrt in der Tiefbahnhof Frankfurt Tagessymmetrie 14 Uhr. Mannheim SFS Mannheim – Stuttgart, Bestandsstrecke Basis: 1 tägliches Zugpaar Karlsruhe SFS Karlsruhe – Offenburg – Basel Berlin Basis für die Überlegungen bildet die Annahme eines Strasbourg/Krimmeri-Meinau (Bahnsteiglänge aktuell 230 m) Halle Bestandsstrecke täglichen Zugpaars für jede Erfurt Linie. Mulhouse Frankfurt LGV Rhin-Rhône; Umfahrung Dijon; LGV Sud-Est Frankreich Mannheim Zugrundeliegende Infrastruk- Karlsruhe Lyon Saint-Exupéry TGV Strasbourg/Krimmeri-Meinau tur Mulhouse LGV Mediterranée Das Konzept für die Züge TEE Montpellier 5/6 basiert auf der heutigen Bestandsstrecke Infrastruktur. Lyon Narbonne Streckengeschwindigkeit Bestandsstrecke Montpellier Perpignan 300 km/h Narbonne Spanien SFS Perpignan – Barcelona Perpignan 250 km/h Figueras Figueras Barcelona SFS Perpignan – Barcelona bis 200 km/h Barcelona Konzept TEE 2.0 | 27.01.2020 | SMA 34 TEE 5/6 Start in Berlin und einsammeln von Reisenden aus Deutschland und der Schweiz Berlin Hbf, 6 Uhr Dresden, Abfahrt: 05:10 Uhr (Ankunft: 07:28 Uhr) Leipzig, Abfahrt 06:48 (Ankunft 07:28 Uhr) Erfurt, 7:45 Uhr Hamburg, Abfahrt: 06:07 Uhr (Ankunft 09:28 Uhr) (Transfer in Frankfurt) Frankfurt Süd, 10 Uhr Köln, Abfahrt: 08:55 Uhr (Ankunft: 10:23 Uhr) Mannheim, 10:30 Uhr Stuttgart, Abfahrt: 09:58 Uhr (Ankunft: 10:53 Uhr) München, Abfahrt: 07:28 Uhr (Umstieg in Stuttgart) Karlsruhe, Luxemburg, Abfahrt: 09:24 Uhr (Zusätzlicher Taktzug) 11 Uhr (Transfer in Strasbourg) Strasbourg /Krimmeri- Meinau, Basel, Abfahrt: 11:30 Uhr (Ankunft: 12:09 Uhr) 11:30 Uhr Zürich, Abfahrt: 10:30 Uhr Bern, Abfahrt: 10:30 Uhr (Umstieg in Basel) Konzept TEE 2.0 | 27.01.2020 | SMA Mulhouse, 35 12:15 Uhr TEE 5/6 Verteilen der Reisenden in Frankreich und Spanien Paris, Ankunft: 15:30 Uhr Mulhouse, 12:15 Uhr Marseille, Ankunft: 16:30 Uhr Lyon St-Exupéry, 14:45 Uhr Montpellier, 16:15 Uhr Toulouse, Ankunft: 19:30 Uhr Barcelona, 19:15 Uhr Valencia, Ankunft: 23:30 Uhr Madrid, Ankunft: 22:00 Uhr Mallorca Weitere Fährverbindungen nach Ibiza und Nordafrika nicht analysiert. Konzept TEE 2.0 | 27.01.2020 | SMA 36 TEE 5/6 Weitere Verbesserung der Relation Berlin – Barcelona im Deutschlandtakt Berlin Hbf, 6:15 Uhr Dresden, Abfahrt: 05:34 Uhr Erfurt, 8:00 Uhr Leipzig, Abfahrt 07:13 Hamburg, Abfahrt: 06:04 Uhr Frankfurt Hbf (tief), 9:45 Uhr Köln, Abfahrt: 08:33 Uhr Mannheim, 10:15 Uhr Stuttgart, Abfahrt: 09:25 Uhr München, Abfahrt: 07:41 Uhr (Umstieg in Stuttgart) Karlsruhe, Luxemburg, Abfahrt: 09:24 Uhr (Zusätzlicher Taktzug) 10:45 Uhr (Transfer in Strasbourg) Strasbourg /Krimmeri- Meinau, Basel, Abfahrt: 11:30 Uhr 11:15 Uhr Zürich, Abfahrt: 10:30 Uhr Bern, Abfahrt: 10:30 Uhr (Umstieg in Basel) Konzept TEE 2.0 | 27.01.2020 | SMA Mulhouse, 37 12:00 Uhr TEE 5/6 Weitere Verbesserung der Relation Berlin – Barcelona im Deutschlandtakt Paris, Ankunft: 15:30 Uhr Mulhouse, 12:00 Uhr Marseille, Ankunft: 16:30 Uhr Lyon St-Exupéry, 14:30 Uhr Montpellier, 16:00 Uhr Toulouse, Ankunft: 19:12 Uhr Barcelona, 19:00 Uhr Valencia, Ankunft: 23:30 Uhr Madrid, Ankunft: 22:00 Uhr Mallorca Weitere Fährverbindungen nach Ibiza und Nordafrika nicht analysiert. Konzept TEE 2.0 | 27.01.2020 | SMA 38 TEE 5/6 Eine Direktverbindung Berlin – Barcelona ist mit einer Reisezeit von 13h und 15 min kurzfristig möglich Heute TEE-Netz TEE-Netz (Zielfahrplan) – Fahrzeit: 15h45 – Fahrzeit: 13h15 – Fahrzeit: 12h45 – Umsteigevorgänge: 4 – Direktverbindung – Direktverbindung – SFS Fulda – Mannheim – Tiefbahnhof Frankfurt 06:00 TEE 5 06:15 TEE 5 19:15 19:00 gratis WLAN an Bord gratis WLAN an Bord gratis Bordunterhaltungssystem gratis Bordunterhaltungssystem Speiswagen und Catering am Platz verfügbar Speiswagen und Catering am Platz verfügbar Sitze in Fahrtrichtung Sitze in Fahrtrichtung Konzept TEE 2.0 | 27.01.2020 | SMA 39 TEE 7/8 Amsterdam – Brüssel – Paris – Lyon – Barcelona Niederlande Betrachtung einer Richtung Amsterdam Die nachfolgenden Folien HSL-Zuid beschreiben das Konzept Rotterdam anhand einer Fahrtrichtung. Die HSL-Zuid Ausführungen gelten analog Antwerpen Belgien auch für die Gegenrichtung. Die Bestandsstrecke Gegenrichtung verkehrt in der Brüssel Tagessymmetrie 14 Uhr. LGV Nord Flughafen Paris-Charles de Gaulle Basis: 1 tägliches Zugpaar Basis für die Überlegungen LGV Interconnex Est, LGV Sud-Est Amsterdam Frankreich bildet die Annahme eines Rotterdam Lyon Saint-Exupéry TGV täglichen Zugpaars für jede Antwerpen LGV Méditerranée Linie. Brüssel Montpellier Bestandsstrecke Zugrundeliegende Infrastruk- Flughafen Paris-Charles de Gaulle Narbonne tur Bestandsstrecke Das Konzept für die Züge TEE Perpignan 7/8 basiert auf der heutigen SFS Perpignan – Barcelona Spanien Infrastruktur. Lyon Figueras Streckengeschwindigkeit SFS Perpignan – Barcelona Montpellier 300 km/h Narbonne Barcelona Perpignan 250 km/h Figueras Barcelona bis 200 km/h Konzept TEE 2.0 | 27.01.2020 | SMA 40 TEE 7/8 Einsammeln von Reisenden aus den Niederlanden und aus Belgien Amsterdam, 8:15 Uhr Zandvoort, Abfahrt: 07:34 Uhr (Ankunft: 08:05 Uhr) Den Haag, Abfahrt: 07:03 Uhr (Ankunft: 07:55 Uhr) Eindhoven, Abfahrt: 08:13 Uhr Rotterdam, 9:30 Uhr Antwerpen, 10 Uhr London , Abfahrt: 07:16 Uhr Köln, Abfahrt: 08:43 Uhr Brügge, Abfahrt: 09:31 Uhr Brüssel, 10:45 Uhr Gent, Abfahrt: 10:00 Uhr Flughafen Paris-Charles de Gaulle, 12 Uhr Konzept TEE 2.0 | 27.01.2020 | SMA 41 TEE 7/8 Verteilen der Reisenden in Frankreich und Spanien Paris-Charles de Gaulle, 12 Uhr Marseille, Ankunft: 15:30 Uhr Lyon St-Exupéry, 14:00 Uhr Montpellier, 15:30 Uhr Toulouse, Ankunft: 18:30 Uhr Barcelona, 18:30 Uhr Madrid, Ankunft: 21:00 Uhr Valencia, Ankunft: 22:30 Uhr Mallorca Weitere Fährverbindungen nach Ibiza und Nordafrika nicht analysiert. Konzept TEE 2.0 | 27.01.2020 | SMA 42 TEE 7/8 Amsterdam – Barcelona als Direktverbindung mit einer Reisezeit von 10 h und 15 min möglich Heute TEE-Netz (Konzept und Zielfahrplan) – Fahrzeit: 11h18 Fahrzeit: 10h15 – Umsteigevorgänge: 2 – Direktverbindung (Bruxelles und Lyon) 08:15 TEE 7 18:30 gratis WLAN an Bord gratis Bordunterhaltungssystem Speiswagen und Catering am Platz verfügbar Sitze in Fahrtrichtung Perspektive für die Linie TEE 7/8 Potenzial für Ausbau im Abschnitt Montpellier bis Perpignan. Eine Realisierung ist jedoch nicht absehbar. Konzept TEE 2.0 | 27.01.2020 | SMA 43 TEE 9/10 Berlin – München – Innsbruck- Bologna – Rom Betrachtung einer Richtung Die nachfolgenden Folien beschreiben das Konzept Berlin Hbf Perspektiven im Zielfahrplan anhand einer Fahrtrichtung. Die VDE 8.3 Deutschland Takt Ausführungen gelten analog Halle Hbf  Fertigstellung des Ausbaus auch für die Gegenrichtung. Die auf dem Korridor Erfurt – Gegenrichtung verkehrt in der VDE 8.2 München Deutschland Tagessymmetrie 14 Uhr. Erfurt Hbf  Fertigstellung des VDE 8.1 Brennernordzulaufs in Basis: 1 tägliches Zugpaar Deutschland Nürnberg Hbf Basis für die Überlegungen Berlin SFS Nürnberg – Ingolstadt bildet die Annahme eines Bestandsstrecke täglichen Zugpaars für jede München Hbf Linie. Bestandsstrecke SFS Radfeld - Innsbruck Öster- reich Nürnberg Zugrundeliegende Infrastruk- Innsbruck Hbf tur München Brennerbasistunnel Das Konzept für die Züge TEE Bozen 9/10 basiert auf der Infrastruktur Bestandsstrecke Streckengeschwindigkeit per Ende der 2020er Jahre Italien (Inbetriebnahme Brenner Bologna 300 km/h Basistunnel). Bologna SFS Milano – Roma bis 250 km/h Florenz SFS Milano – Roma bis 200 km/h Rom Rom Termini Konzept TEE 2.0 | 27.01.2020 | SMA 44 TEE 9/10 Anbindung Deutschland Hamburg, Abfahrt: 05:27 Uhr (Ankunft: 07:23 Uhr) Berlin, 7:45 Uhr Rostock, Abfahrt: 04:34 Uhr (Ankunft: 07:16 Uhr) Leipzig, Abfahrt: 08:23 Uhr (Ankunft: 08:50 Uhr) Halle, 9:00 Uhr Dresden, Abfahrt: 06:14 Uhr (Ankunft: 08:41 Uhr) Kassel, Abfahrt: 07:05 Uhr (Ankunft: 09:21 Uhr) Erfurt, 9:30 Uhr Frankfurt, Abfahrt: 08:22 Uhr (Ankunft: 10:27 Uhr) Nürnberg, 10:45 Uhr Stuttgart, Abfahrt: 09:14 Uhr (Ankunft: 11:44 Uhr) (Transfer in München) München Ost, 12:00 Uhr Konzept TEE 2.0 | 27.01.2020 | SMA 45 TEE 9/10 Anbindung von Österreich und Italien Landeck, Ankunft: 14:31 Uhr Innsbruck, ca. 13:30 Uhr Meran, Ankunft: 15:45 Uhr Bozen,14:15 Uhr Bologna,16:45 Uhr Mailand, Ankunft: 18:12 Uhr Ancona, Ankunft: 18:47 Uhr Florenz Campo di Marte, 17:30 Uhr Napoli, Ankunft: 20:48 Uhr Rom, 19:00 Uhr Siracusa, Ankunft: 09:36 Uhr Palermo, Ankunft: 10:08 Uhr Anschluss von/nach Nachtzuglinie Konzept TEE 2.0 | 27.01.2020 | SMA 46 TEE 9/10 Perspektive: Berlin – Rom als Direktverbindung mit einer Reisezeit von 10 h und 15 min Heute TEE-Netz – Fahrzeit: 14h40 – Fahrzeit: 10h15 – Umsteigevorgänge: 2 – Direktverbindung (München und Verona) – Mit Brenner-Basistunnel 07:45 TEE 9 an 19:00 gratis WLAN an Bord gratis Bordunterhaltungssystem Speiswagen und Catering am Platz verfügbar Perspektive für die Linie TEE 9/10  Fahrzeitverkürzung durch Fertigstellung des Brennernordzulaufs in Deutschland  Nach Fertigstellung des Ausbaus auf dem Korridor Erfurt – München verkürzt sich die Fahrzeit um 15 Minuten. Konzept TEE 2.0 | 27.01.2020 | SMA 47 TEE 11/12 Paris – Stuttgart – München – Wien – Budapest Frankreich Betrachtung einer Richtung Paris Est Die nachfolgenden Folien beschreiben das Konzept LGV Est européenne anhand einer Fahrtrichtung. Die Strasbourg Ausführungen gelten analog Bestandsstrecke auch für die Gegenrichtung. Die Gegenrichtung verkehrt in der Karlsruhe Hbf Tagessymmetrie 14 Uhr. Bestandstrecke SFS Bruchsal – Stuttgart Deutschland Stuttgart Hbf Basis: 1 tägliches Zugpaar NBS Stuttgart – Ulm Basis für die Überlegungen Perspektiven im Zielfahrplan bildet die Annahme eines Ulm Hbf Deutschland Takt täglichen Zugpaars für jede Bestandsstrecke  SFS Ulm – Augsburg Linie. München Ost  ABS München – Mühldorf – Karlsruhe Salzburg Zugrundeliegende Infrastruk- Bestandsstrecke Stuttgart Paris Nord Strasbourg München tur Stuttgart 21 Wien Salzburg Hbf Ulm Hbf Salzburg Budapest Streckengeschwindigkeit Das Konzept für die Züge TEE Österreich Bestandsstrecke 11/12 basiert auf der Infrastruk- 300 km/h tur inkl. Stuttgart 21 sowie der Linz Hbf Neubaustrecke Stuttgart – Ulm 250 km/h Westbahn Wien Hbf bis 200 km/h Bestandsstrecke Ungarn Budapest-Keleti Nicht alle Zwischenhalte dargestellt Konzept TEE 2.0 | 27.01.2020 | SMA 48 TEE 11/12 Anbindung von Frankreich und Deutschland *Paris Austerlitz Toulouse, Abfahrt: 22:20 Uhr (Ankunft: 06:52* Uhr) Briançon, Abfahrt: 20:03 Uhr (Ankunft: 06:55* Uhr) Paris Est, 8:30 Uhr Nancy, Abfahrt: 08:14 Uhr (Ankunft: 09:41 Uhr) Mulhouse, Abfahrt: 09:16 Uhr (Ankunft: 10:09 Uhr) Strasbourg, 10:15 Uhr Basel SBB, Abfahrt: 09:06 Uhr (Ankunft: 10:49 Uhr) Karlsruhe, 11:00 Uhr Zürich, Abfahrt: 11:28 Uhr (Ankunft: 08:35 Uhr) Stuttgart, 11:30 Uhr Friedrichshafen, Abfahrt: 10:51 Uhr (Ankunft: 11:53 Uhr) Ulm, 12:15 Uhr Konzept TEE 2.0 | 27.01.2020 | SMA München-Pasing, 49 13:15 Uhr TEE 11/12 Anbindung von Österreich und Ungarn München Ost, 13:30 Uhr Salzburg,15:00 Uhr Zell am See, Ankunft: 16:45 Uhr Linz,16:15 Uhr St. Pölten, 17:00 Uhr Wien Hbf, 17:30 Uhr Bratislava-P., Ankunft: 18:45 Uhr Budapest, 19:15 Uhr Kiew, Ankunft: 17:21 Uhr Pecs, Ankunft: 22:30 Uhr Anschluss von/nach Nachtzuglinie Konzept TEE 2.0 | 27.01.2020 | SMA 50 TEE 11/12 Perspektive: Paris – Budapest als Direktverbindung mit einer Reisezeit von 10h und 55 Minuten Heute TEE-Netz – Fahrzeit: 12h39 – Fahrzeit: 10h55 – Umsteigevorgänge: 3 – Direktverbindung 08:25 TEE 3 19:20 gratis WLAN an Bord gratis Bordunterhaltungssystem Speiswagen und Catering am Platz verfügbar Sitze in Fahrtrichtung Perspektive für die Linie TEE 11/12  Beschleunigung im D-Takt mit SFS Ulm – Augsburg um 10‘  Beschleunigung durch ABS München – Mühldorf – Salzburg um 15‘ Konzept TEE 2.0 | 27.01.2020 | SMA 51 TEE 13/14 Stockholm – Kopenhagen – Hamburg – Brüssel – Paris Stockholm Betrachtung einer Richtung Schweden Die nachfolgenden Folien Stockholm beschreiben das Konzept Bestandsstrecke anhand einer Fahrtrichtung. Die Essen Hbf Ausführungen gelten analog Malmö Bestandsstrecke Öresundverbindung auch für die Gegenrichtung. Die Duisburg Hbf Deutschland DNK Gegenrichtung verkehrt in der Kopenhagen Malmö Kopenhagen Flughafen Tagessymmetrie 14 Uhr. Bestandsstrecke SFS Fehmarnbeltquerung Lübeck Hbf Düsseldorf Hbf Basis: 1 tägliches Zugpaar Hamburg Bestandsstrecke Bestandsstrecke Basis für die Überlegungen Hamburg Harburg Köln Hbf Deutschland bildet die Annahme eines Bestandsstrecke SFS Köln – Aachen täglichen Zugpaars für jede Bestandsstrecke Linie. Brüssel Köln Bremen Hbf Aachen Hbf Bestandsstrecke HSL 3 Belgien Osnabrück Hbf Lüttich Zugrundeliegende Infrastruk- Paris HSL 2 tur Bestandsstrecke Das Konzept für die Züge TEE Brüssel Münster Hbf 13/14 basiert auf der Bestandsstrecke LGV Nord Paris Gare du Nord Frankreich Infrastruktur per Ende der 2020er Jahre (Inbetriebnahme Fehmarnbeltquerung). Streckengeschwindigkeit Perspektiven im Zielfahrplan Deutschland Takt 300 km/h  SFS Hamm – Hannover bis 250 km/h  SFS Hannover – Hamburg bis 200 km/h Konzept TEE 2.0 | 27.01.2020 | SMA 52 TEE 13/14 Anbindung Schweden, Dänemark und Deutschland Uppsala, Abfahrt: 04:26 Uhr (Ankunft: 05:37 Uhr) Stockholm, 6:00 Uhr Linköping, 8:30 Uhr Göteborg, Abfahrt: 06:40 Uhr (Ankunft: 09:51 Uhr) Malmö, 10:30 Uhr Kopenhagen Kopenhagen Hbf, Abfahrt: 10:27 Uhr (Ankunft: 10:40 Uhr) Flughafen, 10:45 Uhr Kiel, Abfahrt: 11:27 Uhr (Ankunft: 12:55 Uhr) (Transfer in Hamburg) Westerland, Abfahrt: 09:26 Uhr (Ankunft: 12:55 Uhr) Hamburg Harburg, 13:15 Uhr Konzept TEE 2.0 | 27.01.2020 | SMA 53 TEE 13/14 Anbindung von Deutschland, Belgien und Frankreich Oldenburg, Ankunft: 14:53 Uhr Bremen Hbf, 14:00 Uhr Amsterdam, Ankunft: 19:00 Uhr Osnabrück, 14:45 Uhr Dortmund, Ankunft: 16:45 Uhr Essen Hbf, 16:15 Uhr Köln Hbf, 17:15 Uhr Frankfurt, Ankunft: 18:31 Uhr Brüssel Midi, 19:00 Uhr London, Ankunft: 21:33 Uhr Paris, 20:30 Uhr Lyon, Ankunft 22:56 Uhr Konzept TEE 2.0 | 27.01.2020 | SMA 54 TEE 13/14 Perspektive: Stockholm – Paris als Direktverbindung mit einer Reisezeit von 14h und 25 min Heute TEE-Netz – Fahrzeit: 23h – Fahrzeit: 14h25 – Umsteigevorgänge: 4 – Direktverbindung 06:00 TEE 9 an 20:35 gratis WLAN an Bord gratis Bordunterhaltungssystem Speiswagen und Catering am Platz verfügbar Perspektive für die Linie TEE 11/12  Eine Führung im D-Takt via Hannover statt Bremen ist ca. 40‘ schneller:  Beschleunigung mit SFS Hamm – Hannover  Beschleunigung mit SFS Hamburg – Hannover Konzept TEE 2.0 | 27.01.2020 | SMA 55 TEE 15/16 Stockholm – Kopenhagen – Berlin – München Stockholm Betrachtung einer Richtung Schweden Die nachfolgenden Folien Stockholm beschreiben das Konzept Bestandsstrecke anhand einer Fahrtrichtung. Die Malmö Ausführungen gelten analog auch für die Gegenrichtung. Die Öresundverbindung DNK Gegenrichtung verkehrt in der Kopenhagen Malmö Kopenhagen Flughafen Tagessymmetrie 14 Uhr. SFS Fehmarnbeltquerung Basis: 1 tägliches Zugpaar Lübeck Hbf Basis für die Überlegungen Berlin Bestandsstrecke bildet die Annahme eines Schwerin täglichen Zugpaars für jede Bestandsstrecke Linie. ABS Hamburg - Berlin Perspektiven im Zielfahrplan Berlin Hbf Deutschland Nürnberg Deutschland Takt Zugrundeliegende Infrastruk- VDE 8.3 Fertigstellung des Ausbaus auf tur München Halle Hbf dem Korridor Erfurt – München Das Konzept für die Züge TEE 15/16 basiert auf der VDE 8.2 Infrastruktur per Ende der Erfurt Hbf Streckengeschwindigkeit 2020er Jahre (Inbetriebnahme VDE 8.1 Fehmarnbeltquerung und 300 km/h Elektrifizierung Lübeck – Bad Nürnberg Hbf SFS Nürnberg - Ingolstadt bis 250 km/h Kleinen inkl. Kurve „Bad Bestandsstrecke Kleinen“). bis 200 km/h Rom München Hbf Konzept TEE 2.0 | 27.01.2020 | SMA 56 TEE 15/16 Anbindung Schweden, Dänemark und Deutschland Luleaa, Abfahrt: 16:59 Uhr (Ankunft: 06:45 Uhr) Stockholm, 8:30 Uhr Linköping, 11:00 Uhr Oslo, Abfahrt: 06:01 Uhr (Ankunft: 12:54 Uhr) Malmö, 13:00 Uhr Kopenhagen Kopenhagen Hbf, Abfahrt: 12:56 Uhr (Ankunft: 13:09 Uhr) Flughafen, 13:15 Uhr Kiel, Abfahrt: 13:43 Uhr (Ankunft: 14:52 Uhr) Lübeck Hbf, 15:15 Uhr Anschluss von/nach Nachtzuglinie Konzept TEE 2.0 | 27.01.2020 | SMA 57 TEE 15/16 Anbindung von Deutschland Rostock, Ankunft: 17:50 Uhr Schwerin, 16:15 Uhr Dresden, Ankunft: 20:41 Uhr Berlin Hbf, 17:45 Uhr Leipzig, Ankunft: 19:38 Uhr Halle Hbf, 19:00 Uhr Erfurt Hbf, 19:30 Uhr Frankfurt, Ankunft: 21:44 Uhr Nürnberg Hbf, 20:45 Uhr Regensburg, Ankunft: 22:38 Uhr München Hbf, 22:00 Uhr Salzburg, Ankunft 01:42 Uhr Budapest, Ankunft 09:19 Anschluss von/nach Nachtzuglinie Venedig, Ankunft 08:34 Konzept TEE 2.0 | 27.01.2020 | SMA 58 TEE 15/16 Perspektive: Stockholm – München als Direktverbin- dung mit einer Reisezeit von 13 h und 30 min Heute TEE-Netz – Fahrzeit: 17:17h – Fahrzeit: 13h30 – Umsteigevorgänge: 3 – Direktverbindung 08:30 TEE 15 an 22:00 gratis WLAN an Bord gratis Bordunterhaltungssystem Speiswagen und Catering am Platz verfügbar Perspektive für die Linie TEE 15/16 Nach Fertigstellung des Ausbaus auf dem Korridor Erfurt – München verkürzt sich die Fahrzeit um 15 Minuten. Konzept TEE 2.0 | 27.01.2020 | SMA 59 ROLLMATERIAL Die Zulassung von Fahrzeugen für den Einsatz im TEE-Netz TEE 1/2 TEE 3/4 TEE 5/6 TEE 7/8 Paris – Warschau Amsterdam – Rom Berlin – Barcelona Amsterdam – Barcelona Legende FR X X X X Länderzulassung BE X X teilweise bereits vorhanden DE X X X X Länderzulassung bei PO X vorgeschlagenem Fahrzeugkonzept NL X X heute noch nicht verfügbar CH X IT X ESP X X Vorschlag Fahrzeugkonzept TGV-TEE mit Velaro-TEE mit Velaro-TEE Velaro-TEE Polen-Zulassung Schweiz und Italien-Zulassung Konzept TEE 2.0 | 27.01.2020 | SMA 60 ROLLMATERIAL Die Zulassung von Fahrzeugen für den Einsatz im TEE-Netz TEE 9/10 TEE 11/12 TEE 13/14 TEE 15/16 Berlin – Rom Paris – Budapest Paris – Stockholm Stockholm – München Legende FR X X X Länderzulassung BE X teilweise bereits vorhanden DE X X X X X Länderzulassung bei AT X* X vorgeschlagenem Fahrzeugkonzept HU X heute noch nicht verfügbar DK X X *= Brennerbasistunnel wird SWE X X mit 25 kV ~ elektrifiziert IT X Vorschlag Fahrzeugkonzept Velaro-TEE mit TGV-TEE mit TGV-TEE mit Velaro-TEE mit Italien-Zulassung Österreich und Skandinavien- Skandinavien- Ungarn-Zulassung Zulassung Zulassung Konzept TEE 2.0 | 27.01.2020 | SMA 61 GRUNDLAGEN Im Nachtzugverkehr gibt es zurzeit in Westeuropa ROLLMATERIAL nur noch wenige Betreiber eines Netzes Mindestanforderung 2 Linien Fahrzeuge, die nur auf einer Nachtzuglinie verkehren, sind in der nebenstehenden Tabelle nicht berücksichtigt. Bezeichnung Einheitswagen nach UIC-Norm (verschiedenste Trenhotel, Talgo RZD, InterCityNight Allgemein: Im Nachtzugverkehr Wagen und Länderkombinationen) (nicht mehr im Einsatz) werden nur Lok-Wagen-Züge Hersteller diverse Talgo eingesetzt. Länderzulassung FR X X (Trenhotel) Neuer NightJet DE X X (InterCityNight, Talgo RZD) Die ÖBB plant den Kauf neuer BE X Schlag- und Liegewagen für den Einsatz in Österreich, NL X Deutschland, Schweiz und ESP X X (Trenhotel) Italien. CH X X (Trenhotel) AT X IT X X (Trenhotel) PO X X (Talgo RZD) HU X DK X SWE X Höchstgeschwindigkeit bis zu 200 km/h 140-250 km/h Konzept TEE 2.0 | 27.01.2020 | SMA 62 21/22 Paris – Brüssel – Köln – Berlin Frankreich Betrachtung einer Richtung Paris Gare du Nord Die nachfolgenden Folien LGV Nord (vmax : 200 km/h) beschreiben das Konzept anhand einer Fahrtrichtung. Die Bruxelles-Midi Belgien Ausführungen gelten analog Bestandsstrecke auch für die Gegenrichtung. HSL 2 (vmax: 200 km/h) Lüttich Basis: 1 tägliches Zugpaar HSL 3 (vmax : 200 km/h) Basis für die Überlegungen Aachen Hbf Deutschland bildet die Annahme eines Bestandsstrecke Berlin täglichen Zugpaars für jede Hannover SFS Düren – Köln (vmax : 200 km/h) Linie. Köln Hbf Bestandsstrecke Brüssel Köln SFS Wolfsburg – Berlin (vmax : 200 km/h) Zugrundeliegende Infrastruk- Berlin Hbf tur Das Konzept für die Züge TEEN Paris 21/22 basiert auf der heutigen Infrastruktur. Nicht alle Zwischenhalte dargestellt Konzept TEE 2.0 | 27.01.2020 | SMA 63 21/22 Paris – Brüssel – Köln – Berlin Paris Gare du Nord, Bruxelles-Midi, Lüttich, Aachen, Köln Hbf, Berlin Hbf, 21:30 Uhr 23:30 Uhr 00:30 Uhr 01:15 Uhr 02.15 Uhr 07.45 Uhr Reisezeit Paris – Berlin: 10 h15 min Konzept TEE 2.0 | 27.01.2020 | SMA *Paris Montparnasse 64 ** Paris Bercy 23/24 Brüssel – Köln – Berlin – Prag/Warschau Betrachtung einer Richtung Brüssel Belgien Die nachfolgenden Folien HSL 2 (vmax : 200 km/h) beschreiben das Konzept anhand einer Fahrtrichtung. Die Lüttich Ausführungen gelten analog HSL 3 (vmax : 200 km/h) auch für die Gegenrichtung. Aachen Hbf Bestandsstrecke Basis: 1 tägliches Zugpaar SFS Düren – Köln (vmax : 200 km/h) Basis für die Überlegungen Köln Hbf Deutschland bildet die Annahme eines Berlin Bestandsstrecke täglichen Zugpaars für jede Hannover Warschau Linie. Hannover Hbf Bestandsstrecke Brüssel Dresden Köln SFS Wolfsburg – Berlin (vmax : 200 km/h) Zugrundeliegende Infrastruk- Prag Berlin Hbf Berlin Hbf tur Das Konzept für die Züge TEEN Bestandsstrecke Bestandsstrecke Paris 23/24 basiert auf der heutigen Frankfurt (Oder) Dresden Hbf Infrastruktur. Bestandsstrecke Bestandsstrecke Tschechien Polen Posen Prag Bestandsstrecke Warschau Nicht alle Zwischenhalte dargestellt Konzept TEE 2.0 | 27.01.2020 | SMA 65 23/24 Brüssel – Köln – Berlin – Prag/Warschau Warschau, 09:15 Uhr Posen, 06:30 Uhr Bruxelles-Midi, Lüttich, Aachen, Köln Hbf, Berlin Hbf, Krakau, Ankunft: 12:02 Uhr 19:30 Uhr 20:30 Uhr 21:15 Uhr 22:15 Uhr 03:45 Uhr Brest, Ankunft: 19:10 Uhr Moskau, Ankunft: 08:50 Uhr (+1) Olstzyn, Ankunft: 10:15 Uhr Danzig, Ankunft: 10:37 Uhr Dresden Hbf, Prag, 06:00 Uhr 08:30 Uhr Brno, Ankunft: 11:19 Uhr Bratislava, An- kunft: 13:45 Uhr Reisezeit Brüssel – Warschau: 14 h 45 min Reisezeit Brüssel – Prag: 14h Konzept TEE 2.0 | 27.01.2020 | SMA 66 25/26 Amsterdam – Köln – Basel – Venedig/Genua Niederlande Betrachtung einer Richtung Amsterdam Die nachfolgenden Folien beschreiben das Konzept Bestandsstrecke anhand einer Fahrtrichtung. Die Köln Ausführungen gelten analog SFS Köln – Frankfurt (vmax : 200 km/h) auch für die Gegenrichtung. Frankfurt Flughafen Deutschland Basis: 1 tägliches Zugpaar Bestandstrecke Basis für die Überlegungen Mannheim bildet die Annahme eines SFS Mannheim – Graben-Neudorf (vmax : 200 km/h) täglichen Zugpaars für jede Amsterdam Bestandsstrecke Linie. Karlsruhe Köln Bestandsstrecke Zugrundeliegende Infrastruk- Basel Bad Bahnhof tur Frankfurt Bestandsstrecke sowie Gotthardtunnel Schweiz Karlsruhe Das Konzept für die Züge TEEN 25/26 basiert auf der Bellinzona Infrastruktur per Ende 2020 Basel Bestandsstrecke sowie Ceneri-Basistunnel (Inbetriebnahme Ceneri Basistunnel). Lugano Mailand Venedig Bestandsstrecke Genua Italien Mailand Bestandstrecke Perpignan Genua/Venedig Nicht alle Zwischenhalte dargestellt Konzept TEE 2.0 | 27.01.2020 | SMA 67 25/26 Amsterdam – Köln – Basel – Venedig/Genua Turin, Ankunft: 08:45 Uhr Rimini, Ankunft: 10:40 Uhr Rom, Ankunft: 11:10 Uhr Rimini, Ankunft: 15:50 Uhr Venedig, 10:30 Uhr Amsterdam, Köln, Basel Bad Bf, Lugano, Mailand, 20:00 Uhr 22:45 Uhr 03:30 Uhr 06:00 Uhr 07:30 Uhr Triest, Ankunft: 12:44 Uhr Genua, 09:00 Uhr Pisa, Ankunft: 11:00 Uhr Reisezeit Amsterdam – Venedig: 14 h 30 min Reisezeit Amsterdam – Genua: 13 h Konzept TEE 2.0 | 27.01.2020 | SMA 68 27/28 Frankfurt/Zürich – Lyon – Montpellier – Barcelona Deutschland Betrachtung einer Richtung Frankfurt Hbf Die nachfolgenden Folien Riedbahn beschreiben das Konzept Mannheim anhand einer Fahrtrichtung. Die SFS Mannheim – Karlsruhe (vmax : 200 km/h) Ausführungen gelten analog Karlsruhe Zürich HB Schweiz auch für die Gegenrichtung. SFS Karlsr. – Offenb. (vmax : 200 km/h) Bestandsstrecke Strasbourg Basel SBB Basis: 1 tägliches Zugpaar Bestandsstrecke Bestandsstrecke Basis für die Überlegungen Mulhouse Mulhouse bildet die Annahme eines Frankreich täglichen Zugpaars für jede LGV Rhin-Rhône; Umfahrung Dijon; LGV Paris – Lyon (vmax : 200 km/h) Linie. Lyon LGV Lyon – Marseille/Montpellier (vmax : 200 km/h) Zugrundeliegende Infrastruk- Montpellier tur Mannheim Frankfurt Bestandsstrecke Das Konzept für die Züge TEEN Karlsruhe Narbonne Strasbourg 27/28 basiert auf der heutigen Mulhouse Basel Bestandsstrecke Infrastruktur. Zürich Perpignan Spanien SFS Perpignan – Barcelona (vmax : 200 km/h) Lyon Figueras SFS Perpignan – Barcelona (vmax : 200 km/h) Montpellier Narbonne Barcelona Perpignan Figueras Barcelona Konzept TEE 2.0 | 27.01.2020 | SMA 69 27/28 Frankfurt/Zürich – Lyon – Montpellier – Barcelona Nürnberg, Abfahrt: 17:42 Uhr Frankfurt, Köln Hbf, Abfahrt: 18:55 Uhr 20:00 Uhr Karlsruhe, 21:15 Uhr Toulouse, Strasbourg, Ankunft: 07:40 Uhr 22:00 Uhr Mulhouse, Lyon, Montpellier Narbonne, Barcelona, 23:00 Uhr 02:30 Uhr 05:00 Uhr 06:00 Uhr 08:45 Uhr Berlin, Abfahrt: 15:33 Uhr Hamburg, Abfahrt: 16:24 Uhr Biel, Abfahrt: 20:49 Uhr Luzern, Abfahrt: 20:54 Uhr Bern, Abfahrt: 21:04 Uhr Madrid, Ankunft: 11:45 Uhr Zürich HB, Valencia, Ankunft: 12:00 Uhr 21:00 Uhr Basel, Chur, Abfahrt: 19:16 Uhr 22:15 Uhr Reisezeit Frankfurt - Barcelona: 14 h 45 min St. Gallen, Abfahrt: 19:37 Uhr Reisezeit Zürich - Barcelona: 11 h 45 min Konzept TEE 2.0 | 27.01.2020 | SMA 70 29/30 Berlin – München – Innsbruck – Verona – Rom/Genua – Nizza Betrachtung einer Richtung Die nachfolgenden Folien beschreiben das Konzept Berlin Hbf anhand einer Fahrtrichtung. Die Bestandsstrecke Ausführungen gelten analog Halle Hbf auch für die Gegenrichtung SFS Halle – Erfurt (vmax : 200 km/h) Deutschland Basis: 1 tägliches Zugpaar Erfurt Hbf Basis für die Überlegungen SFS Erfurt – Nürnberg (vmax : 200 km/h) bildet die Annahme eines Nürnberg Hbf täglichen Zugpaars für jede Berlin SFS Nürnberg – Ingolstadt (vmax : 200 km/h) Linie. Bestandsstrecke München Hbf Zugrundeliegende Infrastruk- Bestandsstrecke SFS Radfeld – Innsbruck (vmax : 200 km/h) Öster- tur reich Nürnberg Innsbruck Hbf Das Konzept für die Züge TEEN 29/30 basiert auf der heutigen München Bestandsstrecke Infrastruktur. Bozen Bestandsstrecke Italien Mailand Verona Verona Verona Genua Bologna SFS Verona – Milano Nizza SFS Milano – Roma (vmax : 200 km/h) (vmax : 200 km/h) Bologna Mailand SFS Milano – Roma (vmax : 200 km/h) Bestandsstrecke Rom Rom Termini Nizza Nicht alle Zwischenhalte dargestellt Konzept TEE 2.0 | 27.01.2020 | SMA 71 29/30 Berlin – München – Innsbruck – Verona – Rom/Genua – Nizza Nizza, Genua PP, 11:30 Uhr 08:30 Uhr Mailand, 06:30 Uhr Berlin, Nürnberg, München Hbf, Innsbruck Hbf, Verona Hbf, 18:40 Uhr 22:15 Uhr 23:45 Uhr 01:15 Uhr 04:30 Uhr La Spezia, Ankunft: 10:10 Uhr Turin, Ankunft: 08:00 Uhr Rom, 08:30 Uhr Bologna Hbf, 05:30 Uhr Napoli, Ankunft: 10:00 Uhr Reisezeit Berlin – Nizza: 16 h 50 min Reisezeit Berlin – Rom: 13 h 50 min Konzept TEE 2.0 | 27.01.2020 | SMA 72 31/32 Paris – Stuttgart – München – Wien – Budapest/Zagreb Frankreich Betrachtung einer Richtung Paris Est Die nachfolgenden Folien beschreiben das Konzept LGV Paris – Strasbourg (vmax : 200 km/h) anhand einer Fahrtrichtung. Die Strasbourg Ausführungen gelten analog Bestandsstrecke auch für die Gegenrichtung. Karlsruhe Hbf Bestandstrecke Basis: 1 tägliches Zugpaar SFS Bruchsal – Stuttgart (vmax : 200 km/h) Deutschland Basis für die Überlegungen Stuttgart Hbf bildet die Annahme eines Bestandsstrecke täglichen Zugpaars für jede Linie. Ulm Hbf Bestandsstrecke Zugrundeliegende Infrastruk- München Ost tur Karlsruhe Bestandsstrecke Das Konzept für die Züge TEEN Paris Nord Strasbourg Stuttgart München Wien 31/32 basiert auf der heutige Stuttgart 21 Ulm Hbf Salzburg Hbf Salzburg Hbf Salzburg Budapest Infrastruktur. Österreich Bestandsstrecke Bestandsstrecke Villach Ljubljana Zagreb Linz Hbf Villach Hbf SFS Linz – Wien (vmax : 200 km/h) Bestandsstrecke Wien Hbf Slowenien Ljubljana Bestandsstrecke Bestandsstrecke Kroatien Ungarn Budapest-Keleti Zagreb Nicht alle Zwischenhalte dargestellt Konzept TEE 2.0 | 27.01.2020 | SMA 73 31/32 Paris – Stuttgart – München – Wien – Budapest/Zagreb Budapest-Keleti, 09:20 Uhr Wien Hbf, 06:30 Uhr Paris Est, Strasbourg, Stuttgart, München Hbf, Salzburg Hbf, 20:00 Uhr 22:30 Uhr 0:00 Uhr 02:30 Uhr 04:00 Uhr Pecs, Ankunft: 12:30 Uhr Bratislava-P., Ankunft: 07:45 Uhr Koper, Ankunft: 11:15 Uhr Villach Hbf, 06.30 Uhr Ljubljana, Zagreb, 08:15 Uhr 10:50 Uhr Belgrad, Ankunft: Klagenfurt, Ankunft: 07:20 Uhr 17:30 Uhr Reisezeit Paris – Budapest: 13 h 10 min Reisezeit Paris – Zagreb: 14 h 50 min Konzept TEE 2.0 | 27.01.2020 | SMA 74 *Paris Montparnasse 33A/34A Kopenhagen – Hamburg – Brüssel – Paris/ Amsterdam Betrachtung einer Richtung Die nachfolgenden Folien Kopenhagen beschreiben das Konzept Öresundverbindung anhand einer Fahrtrichtung. Die Kolding Dänemark Ausführungen gelten analog auch für die Gegenrichtung. Bestandsstrecke Kopenhagen Padborg Basis: 1 tägliches Zugpaar Bestandsstrecke Basis für die Überlegungen Hamburg Hbf Hamburg bildet die Annahme eines Bestandsstrecke täglichen Zugpaars für jede Amsterdam Hannover Hbf Deutschland Linie. Bestandsstrecke Brüssel Köln Köln Hbf Köln Hbf Zugrundeliegende Infrastruk- SFS Köln – Aachen (vmax : 200 km/h) tur Bestandsstrecke Aachen Hbf Bestandsstrecke Das Konzept für die Züge TEEN Paris 33A/34A basiert auf der HSL 2 (vmax : 200 km/h) Holland Belgien heutigen Infrastruktur. Amsterdam Lüttich HSL 3 (vmax : 200 km/h) Brüssel LGV Nord (vmax : 200 km/h) Frankreich Paris Gare du Nord Nicht alle Zwischenhalte dargestellt Konzept TEE 2.0 | 27.01.2020 | SMA 75 33A/34A Kopenhagen – Hamburg – Brüssel – Paris/ Amsterdam Utrecht, Amsterdam, 07:45 Uhr 08:15 Uhr Kopenhagen, Kolding, Hamburg Hbf, Hannover Hbf, Köln Hbf, 19:30 Uhr 21:15 Uhr 0:15 Uhr 02:00 Uhr 05:30 Uhr Den Haag, Ankunft: 09:12 Uhr Gent, Ankunft: 08:56 Uhr Brugge, Ankunft: 09:30 Uhr Liege-G. Hbf, 06.45 Uhr Paris, Brüssel, 10:15 Uhr 08:15 Uhr Bordeaux, Ankunft: Namur, Ankunft: 07:43 Uhr 12:56 Uhr* Reisezeit Kopenhagen – Amsterdam: 12 h 45 min Reisezeit Kopenhagen – Paris: 14 h 45 min Konzept TEE 2.0 | 27.01.2020 | SMA 76 *Abfahrt in Paris Montparnasse 33B/34B Stockholm – Kopenhagen – Hamburg – Brüssel – Paris Stockholm Betrachtung einer Richtung Schweden Die nachfolgenden Folien Stockholm beschreiben das Konzept Bestandsstrecke anhand einer Fahrtrichtung. Die Ausführungen gelten analog Malmö Öresundverbindung auch für die Gegenrichtung. Die DNK Gegenrichtung verkehrt in der Kopenhagen Malmö Kopenhagen Flughafen Tagessymmetrie 14 Uhr. SFS Fehmarnbeltquerung (vmax : 200 km/h) Lübeck Hbf Basis: 1 tägliches Zugpaar Hamburg Bestandsstrecke Basis für die Überlegungen Hannover Hamburg Hbf Deutschland bildet die Annahme eines Bestandsstrecke täglichen Zugpaars für jede Linie. Brüssel Köln Hannover Hbf Bestandsstrecke Zugrundeliegende Infrastruk- Paris Köln Hbf tur SFS Köln – Aachen (vmax : 200 km/h) Bestandsstrecke Das Konzept für die Züge TEE Aachen Hbf 33B/34B basiert auf der HSL 3 (vmax : 200 km/h) Belgien Infrastruktur per Ende der Lüttich 2020er Jahre (Inbetriebnahme HSL 2 (vmax : 200 km/h) Fehmarnbeltquerung). Brüssel LGV Nord (vmax : 200 km/h) Frankreich Paris Gare du Nord Konzept TEE 2.0 | 27.01.2020 | SMA 77 33B/34B Stockholm – Kopenhagen – Hamburg – Brüssel – Paris Utrecht, Amsterdam, 07:45 Uhr 08:15 Uhr Kopenhagen- Stockholm, Flughafen, Hamburg Hbf, Hannover Hbf, Köln Hbf, 16:30 Uhr 21:15 Uhr 0:15 Uhr 02:00 Uhr 05:30 Uhr Den Haag, Ankunft: 09:12 Uhr Gent, Ankunft: 08:56 Uhr Brugge, Ankunft: 09:30 Uhr Liege-G. Hbf, 06.45 Uhr Paris, Brüssel, 10:15 Uhr 08:15 Uhr Bordeaux, Ankunft: Namur, Ankunft: 07:43 Uhr 12:56 Uhr* Konzept TEE 2.0 | 27.01.2020 | SMA 78 *Abfahrt in Paris Montparnasse 35A/36A Kopenhagen – Berlin – Prag – Wien/Budapest Betrachtung einer Richtung Die nachfolgenden Folien Kopenhagen beschreiben das Konzept Öresundverbindung anhand einer Fahrtrichtung. Die Dänemark Ausführungen gelten analog Kolding auch für die Gegenrichtung. Bestandsstrecke Kopenhagen Padborg Basis: 1 tägliches Zugpaar Bestandsstrecke Basis für die Überlegungen Hamburg Hbf Deutschland Hamburg bildet die Annahme eines Bestandsstrecke täglichen Zugpaars für jede Berlin Berlin Hbf Linie. Bestandsstrecke Dresden Dresden Hbf Zugrundeliegende Infrastruk- Prag Bestandsstrecke Slowakei Tschechien tur Breclav Prag-Holesovice Das Konzept für die Züge TEEN 35A/36A basiert auf der Wien Bestandsstrecke heutigen Infrastruktur. Budapest Breclav Breclav Österreich Bestandsstrecke Bestandsstrecke Bratislava Wien Hbf Bestandsstrecke Ungarn Budapest-Keleti Rom Nicht alle Zwischenhalte dargestellt Konzept TEE 2.0 | 27.01.2020 | SMA 79 TEEN 35A/36A Kopenhagen – Berlin – Prag – Wien/Budapest Budapest- Bratislava, Keleti, 08:05 Uhr 10:40 Uhr Kopenhagen, Kolding, Hamburg Hbf, Berlin Hbf, Prag, Breclav, 17:30 Uhr 19:15 Uhr 22:00 Uhr 00:00 Uhr 04:15 Uhr 07:15 Uhr Szolnok, Ankunft: 12:30 Uhr Zilina, Ankunft: 10:40 Uhr Kosice, Ankunft: 13:53 Uhr Wien, 08:15 Uhr Klagenfurt, Ankunft: 12:20 Uhr Reisezeit Kopenhagen – Budapest: 17 h 10 min Reisezeit Kopenhagen – Wien: 14 h 45 min Konzept TEE 2.0 | 27.01.2020 | SMA 80 35B/36B Stockholm – Kopenhagen – Berlin – Prag – Wien/Budapest Betrachtung einer Richtung Stockholm Schweden Die nachfolgenden Folien Stockholm beschreiben das Konzept Bestandsstrecke anhand einer Fahrtrichtung. Die Ausführungen gelten analog Malmö Öresundverbindung auch für die Gegenrichtung. DNK Kopenhagen Kopenhagen Flughafen Basis: 1 tägliches Zugpaar SFS Fehmarnbeltquerung (vmax : 200 km/h) Basis für die Überlegungen Lübeck Hbf Deutschland Lübeck bildet die Annahme eines Bestandsstrecke täglichen Zugpaars für jede Berlin Berlin Hbf Linie. Bestandsstrecke Dresden Dresden Hbf Zugrundeliegende Infrastruk- Prag Bestandsstrecke Slowakei Tschechien tur Breclav Prag-Holesovice Das Konzept für die Züge TEE 35B/36B basiert auf der Wien Bestandsstrecke Infrastruktur per Ende der Budapest Breclav Breclav 2020er Jahre (Inbetriebnahme Österreich Bestandsstrecke Bestandsstrecke Fehmarnbeltquerung). Bratislava Wien Hbf Bestandsstrecke Ungarn Budapest-Keleti Rom Nicht alle Zwischenhalte dargestellt Konzept TEE 2.0 | 27.01.2020 | SMA 81 TEEN 35B/36B Stockholm – Kopenhagen – Berlin – Prag – Wien/Budapest Budapest- Bratislava, Keleti, Kopenhagen 08:05 Uhr 10:40 Uhr Stockholm, Flughafen, Lübeck Hbf, Berlin Hbf, Prag, Breclav, 14:30 Uhr 19:15 Uhr 21:30 Uhr 00:00 Uhr 04:15 Uhr 07:15 Uhr Szolnok, Ankunft: 12:30 Uhr Zilina, Ankunft: 10:40 Uhr Kosice, Ankunft: 13:53 Uhr Wien, 08:15 Uhr Klagenfurt, Ankunft: 12:20 Uhr Reisezeit Stockholm – Budapest: 20 h 10 min Reisezeit Stockholm – Wien: 17 h 45 min Konzept TEE 2.0 | 27.01.2020 | SMA 82 2.0 International high-speed and overnight rail services to promote climate change mitigation Secretariat of the Federal Government Commissioner for Rail Transport www.bmvi.de Contents 1. General introduction 2. Blueprint study – TEE lines 3. Blueprint study – overnight trains 4. Conclusion and next steps www.bmvi.de | 07. Februar 2020 2 Contents 1. General introduction 2. Blueprint study – TEE lines 3. Blueprint study – overnight trains 4. Conclusion and next steps www.bmvi.de | 7 February 2020 3 Societal change in travel behaviour – wider clientele Changes in travel choices due to effects such as • greater awareness of climate change (“flying shame”) • shorter journey times thanks to growing high-speed networks • direct links to and from smaller towns and cities located along the routes of the mainlines Opportunity for new message from railways – new TEE network High-speed trains over long distances (passing through 4, but at least 3 countries) The TransEuropExpress 2.0, or TEE 2.0 for short, is thus a symbol of cohesion and further European integration. Opportunity presented by the German clock-face timetable TEE 2.0 and attractive overnight services can be integrated in the German clock-face timetable and will not use any paths at the expense of freight trains. www.bmvi.de | 7 February 2020 4 Clock-face timetabling such as the “Deutschlandtakt” to form the basis of new TEE network Züge sind bereit zur Abfahrt (00) Abfahrt in den Umsteigebahnhöfen (05) • “More frequent – faster – everywhere”: clock-face timetable will establish a new, transparent principle of upgrading and capacity management. Ankunft in den Umsteigebahnhöfen (55) Züge sind bereit zur Abfahrt (00) • For all types of traffic, reserved capacity will be available that ensures good connections in passenger traffic and reliable paths in goods traffic. The basis will be a clock-face system with trains running hourly or half- hourly. • Infrastructure schemes derived from the timetable will significantly enhance the capacity of the overall network and appreciably increase the nationwide system speed. • Numerous neighbouring countries are using such planning methods or already have a network of highly frequent long-distance trains. • TEE 2.0 will interlink the individual optimized systems to form a range of European services designed to reduce international journey times www.bmvi.de | 7 February 2020 5 Analysis of the situation and blueprint for the TEE 2.0 network in Europe • Identify origin-destination pairs that have inadequate rail services today (existing lines are not called into question) • Develop international lines that reflect the European blueprint and have the following objectives: Source: http://www.spiekermann-wegener.com/mod/time/time.htm • Interlink national high-speed lines to form international lines that stimulate great demand while using as few additional paths on the domestic networks as possible. • Identify opportunities and risks plus the need for action • Reduce journey times significantly and lift transfer restrictions • Identify the technical and timetable-based challenges posed by the lines identified • Derive infrastructure schemes and identify possible rolling stock blueprints for the lines identified www.bmvi.de | 7 February 2020 6 Supplementary steps for the blueprint of a Europe overnight train network Objectives for the blueprint of a Europe overnight train network • Identify possible rolling stock and production blueprints for the lines identified • Identify the necessary planning steps for the way forward Planning bases for overnight train lines • Maximum speed 160 – 230 km/h (Talgo: 250 km/h) • Existing overnight trains operating satisfactorily (Austria/Switzerland – Germany) will not be re-addressed. Rather, it will be assumed that they will be evolved and continue to operate Source: https://blog.oebb.at/die-nightjets-der-neuen-generation/ The development of additional overnight trains is to be welcomed, but their economic challenge is not to be underestimated: sleeping berths can only be sold once per journey, whereas on TEE 2.0 trains, it will be possible to market EuroNight one seat several times for shorter journeys. In addition, the space required per passenger is significantly greater. www.bmvi.de | 7 February 2020 7 Challenges facing internationally connected lines • Different traction current and train protection systems • Railway administrations still have a very national focus • Uniform marketing and pricing poses a challenge because passengers' rights have to be taken into account • Different requirements regarding compulsory reservations and a guaranteed seat • Different rules governing concessions, transport contracts and subsidies • Different languages and operating rules in neighbouring countries • Different technical subtleties and quality levels • Expectations of stopping patterns • Profit expectation vs public service • Different forms of operator www.bmvi.de | 7 February 2020 8 Contents 1. General introduction 2. Blueprint study – TEE lines 3. Blueprint study – overnight trains 4. Conclusion and next steps www.bmvi.de | 7 February 2020 9 The TEE network will be implemented in two phases TEE 1 / TEE 2 Short-term implementation Implementation with commissioning Stockholm Paris – Brussels – Cologne – Berlin – Warsaw of major infrastructure TEE 3 / TEE 4 Amsterdam – Cologne – Basel – Milan – Rome Copenhagen TEE 5 / TEE 6 Fehmarnbelt Fixed Link Berlin – Frankfurt – Lyon – Lübeck Montpellier – Barcelona Hamburg TEE 7 / TEE 8 Hanover Berlin Warsaw Amsterdam Bremen Berlin Warsaw Amsterdam Amsterdam – Brussels – Paris Hanover – Lyon – Barcelona Brussels Brussels Cologne Cologne Frankfurt Frankfurt Karlsruhe Karlsruhe TEE 9 / TEE 10 Paris Freiburg Paris Freiburg Munich Vienna Mulhouse Mulhouse Stuttgart 21 Berlin – Munich – Innsbruck – Basel Basel Salzburg Budapest Brenner Bologna – Rome Base Tunnel TEE 11 / TEE 12 Lyon Milan Lyon Milan Paris – Strasbourg – Stuttgart Bologna Bologna – Munich – Vienna – Budapest Montpellier Montpellier TEE 13 / TEE 14 Perpignan Perpignan Paris – Brussels – Hamburg – Rome Rome Copenhagen – Stockholm Barcelona Barcelona TEE 15 / TEE 16 Stockholm – Copenhagen – Berlin – Munich www.bmvi.de | 7 February 2020 10 10 2ND IMPLEMENTATION The second phase of the TEE network will use PHASE major infrastructure upgrades under construction TEE 9 / TEE 10 Implementation with commissioning Stockholm Links to and from Scandinavia Berlin – Munich – Innsbruck – Bologna – Rome of major infrastructure Once the fixed Fehmarn Belt Fixed Link TEE 11 / TEE 12 between Germany (Puttgarden) and Paris – Strasbourg – Stuttgart Denmark (Rødbyhavn) has been – Munich – Vienna – Budapest TEE 13 / TEE 14 Copenhagen commissioned, it will be possible to reduce Paris – Brussels – Hamburg – Fehmarnbelt Fixed Link Lübeck journey times on this route Copenhagen – Stockholm Hamburg TEE 15 / TEE 16 Bremen Berlin East-West corridor via Southern Germany Amsterdam Warsaw Stockholm – Copenhagen – Berlin – Munich Hanover Services between Paris and Budapest will Brussels Cologne benefit from Stuttgart 21 and the new Frankfurt Karlsruhe Stuttgart – Ulm high-speed line because (a) Paris Mulhouse Freiburg Stuttgart 21 Munich Vienna trains will no longer have to reverse and (b) Basel Brenner Base Tunnel Salzburg Budapest it will be possible to reduce journey times. Lyon Milan Base tunnel on the Brenner artery Montpellier Bologna The Brenner Base Tunnel will likewise make Perpignan it possible to operate trains between Berlin, Barcelona Rome Munich and Rome at high speeds on most sections, thereby enhancing attractiveness. www.bmvi.de | 7 February 2020 11 11 D-TAKT Key long-term infrastructure projects of the “Deutschlandtakt” to accelerate the TEE in Germany INFRASTRUCTURE The lines that can be constructed in the short term will be significantly accelerated by the following infrastructure projects: – Hanover – Bielefeld – Hamm – Karlsruhe – Basel (Rhine Valley Line) – Mannheim – Erfurt (incl. mainline tunnel in Frankfurt) www.bmvi.de | 7 February 2020 12 12 The TEE 2.0 trains will take you right to the heart of European capitals Short-term implementation Implementation with commissioning of major infrastructure TEE 1/2: Paris – Brussels – Cologne – Berlin – Warsaw TEE 9/10: Berlin – Munich – Innsbruck – Bologna – Rome TEE 3/4: Amsterdam – Cologne – Basel – Milan – Rome TEE 11/12: Paris – Stuttgart – Munich – Vienna – Budapest TEE 5/6: Berlin – Frankfurt – Lyon – Barcelona TEE 13/14: Paris – Brussels – Hamburg – Stockholm TEE 7/8: Amsterdam – Brussels – Paris – Lyon – Barcelona TEE 15/16: Stockholm – Copenhagen – Berlin – Munich www.bmvi.de | 7 February 2020 13 ROLLING STOCK There is already rolling stock today that can BASICS operate in many countries of Europe Minimum requirement 300 km/h Many European high-speed networks are designed for a speed of around 300 km/h. For this reason, rolling stock designs Designation TGV Euroduplex and Velaro and similar Zefiro 380 and similar Smile / Giruno that do not achieve this similar threshold are not included in the adjacent table. Manufacturer Alstom Siemens Bombardier / Hitachi Rail Stadler Certified in FR X (various classes) X (class 406/407) X (Frecciarossa 1000) High-speed in Eastern Europe In the Czech Republic and DE X (TGV POS) X (various classes) (X) (medium to long term) Poland, Pendolino trains are in BE X (various classes, X (class 406/407, operation today that can run at a Thalys) Eurostar) maximum speed of 230 km/h and 250 km/h respectively. NL X (Thalys, single- X (class 406/407, decker!) Eurostar) ESP X (TGV Duplex) X (Velaro ESP) CH X (TGV Lyria) X AT X (various classes) (X) (medium to long term) IT X (Frecciarossa 1000) (X) (medium to long term) PO HU DK SWE Maximum speed 320 km/h 350 km/h (Velaro ESP) 360 km/h 250 km/h (poss. 300) 14 14 www.bmvi.de | 7 February 2020 Operator: establishment of a company to operate the new TEE network Proposal Establishment of a company, for instance by SNCF and DB, in which other interested and ambitious railways (e.g. NS, ÖBB, SBB) could take a holding. This company would be approved as an independent railway undertaking and purchase services from the parent companies for production. Opportunities presented by this proposal • Use national expertise of the individual partners • No need for staff of its own to operate the services • Experience specific to countries and rolling stock can inform rolling stock certification • Use of existing rolling stock for short-term launch of the TEE network • Symbol of European cooperation www.bmvi.de | 7 February 2020 15 Contents 1. General introduction 2. Blueprint study – TEE lines 3. Blueprint study – overnight trains 4. Conclusion and next steps www.bmvi.de | 7 February 2020 16 OVERNIGHT TRAIN Modern rolling stock for overnight train services is NETWORK available on the market New overnight trainsets procured by ÖBB Sleeping cars for Azerbaijan Source: https://www.nightjet.com/de/komfortkategorien/nightjetzukunft Manufacturer: Siemens Source: www.bahnonline.ch Manufacturer: Stadler www.bmvi.de | 7 February 2020 17 17 EuroNight overnight network comprising 8 lines of which 2 with medium-term extension option 21 / 22 Short-term implementation Adaptation with commissioning Stockholm Paris – Brussels – Cologne – Berlin of major infrastructure 23 / 24 Brussels – Cologne – Berlin – Prague/Warsaw 25 / 26 Copenhagen Copenhagen Amsterdam – Cologne – Basel – Milan – Venice/Genoa Fehmarnbelt Fixed Link Lübeck 27 / 28 Hamburg Hamburg Frankfurt – Strasbourg/Zürich – Berlin Berlin Hanover Hanover Mulhouse – Lyon – Montpellier – Amsterdam Warsaw Amsterdam Barcelona Brussels Dresde Brussels Cologne Dresden Cologne 29 / 30 n Prague Berlin – Munich – Innsbruck – Prague Frankfurt Bologna – Rome/Nice Karlsruhe Breclav Breclav Paris Strasbourg Munich Paris 31 / 32 Mulhouse Vienna Vienna Salzburg Budapest Budapest Paris – Strasbourg – Stuttgart – Basel Zürich Innsbruck Munich – Vienna – Budapest/ Villach Zagreb Lyon Verona Ljubljana Zagreb Milan Venice 33 / 34 Genoa Bologna Paris – Brussels/Amsterdam – Montpellier Nice Hamburg – Copenhagen – Stockholm* Perpignan Rome 35 / 36 Barcelona Stockholm* – Copenhagen – Berlin – Prague – Vienna/Budapest *If no Fehmarnbelt link, www.bmvi.de | 7 February 2020 18 only to Copenhagen (see 18 subdivision into A and B) Contents 1. General introduction 2. Blueprint study – TEE lines 3. Blueprint study – overnight trains 4. Conclusion and next steps www.bmvi.de | 7 February 2020 19 Conclusion and next steps • An attractive range of services could be crated using present-day infrastructure and timetables. • For business and leisure travellers, these services could very soon represent a climate- friendly alternative to air travel. • Since implementation requires “merely” coordination between railway undertakings with regard to timetables, certification issues, through trains and fares, implementation in the near future would appear conceivable. • Facilitation by the EU Member States as owners of the railway undertakings and/or regulatory authorities would appear helpful with regard to speedy implementation. • Implementation of the infrastructure projects envisaged for the “Deutschlandtakt” target timetable will make it possible to deliver significant journey time reductions and improved services at the heart of the European network, which will have a direct and positive impact on the new TEE 2.0 blueprint. www.bmvi.de | 7 February 2020 20 Detailed descriptions of the lines www.bmvi.de | 7 February 2020 21 TEE 1/2 Paris – Brussels – Cologne – Berlin – Warsaw France Only one direction considered Paris Gare du Nord The following slides describe LGV Nord the blueprint based on a train travelling in one direction. The Brussels Belgium information also applies to the HSL 2 opposite direction. The train crosses the train travelling in the Liège opposite direction at 14:00 hrs. HSL 3 Aachen Hbf Basis: 1 daily pair of trains Existing line Berlin The basis of the considerations Hanover Warsaw Düren – Cologne HSL is the assumption of a daily pair Köln Hbf Prospects in Germany of trains for each line. Existing line Brussels Cologne Deutschlandtakt target Hannover Hbf timetable Infrastructure basis Existing line Commissioning of Hamm – The blueprint for trains TEE 1/2 Wolfsburg – Berlin HSL Hanover HSL Paris is based on present-day Berlin Hbf infrastructure. Existing line Frankfurt (Oder) Existing line Line speed Poland Poznań Existing line 300 km/h Warsaw 250 km/h Up to 200 km/h Blueprint TEE 2.0 | 27.01.2020 | SMA 22 TEE 1/2 Links to and from France and Belgium Toulouse, dep. 22:20 hrs (arr. 06:52 hrs) Briançon, dep. 20:03 hrs (arr. 06:55 hrs) (Change stations in Paris) Paris Gare du Nord, 9:00 hrs London, dep. 07:16 hrs (arr. 10:12 hrs) Rotterdam, dep. 08:58 hrs (arr. 10:08 hrs) Bruges, dep. 09:10 hrs (arr. 10:07 hrs) Gent, dep. 09:39 hrs (arr. 10:07 hrs) Brussels, 10:30 hrs Liège, 10:18 hrs (arr. 11:09 hrs) 11:15 hrs Aachen 11:40 hrs Köln 12:15 hrs Connection from/to overnight train Blueprint TEE 2.0 | 27.01.2020 | SMA 23 TEE 1/2 Links to and from Poland and Germany Hamburg, arr. 16:30 hrs Hannover, 15:00 hrs Berlin, 16:45 hrs Dresden, arr. 19:07 hrs Prague, arr. 21:36 hrs Frankfurt (Oder), 17:45 hrs Poznań, 19:30 hrs Wrocław, arr. 22:10 hrs Gdańsk, arr. 22:56 hrs Warsaw, 22:15 hrs Kraków, arr. 00:50 hrs Zakopane, arr. 05:50 hrs Connection from/to overnight train Blueprint TEE 2.0 | 27.01.2020 | SMA 24 TEE 1/2 Further improvement in links to and from France and Belgium in the Deutschlandtakt Toulouse, dep: 22:20 hrs Briançon, dep. 20:03 hrs Bordeaux, dep. 05:45 hrs (Change stations in Paris) Paris Gare du Nord, 9:00 hrs Bordeaux, dep. 07:16 hrs Rotterdam, dep. 08:58 hrs Bruges, dep. 09:25 hrs Brussels, 10:30 hrs Gent, dep. 09:55 hrs Liège, Namur, 10:18 hrs 11:15 hrs Aachen 11:40 hrs Köln 12:15 hrs Connection from/to overnight train Blueprint TEE 2.0 | 27.01.2020 | SMA 25 TEE 1/2 Further improvement in links to and from Germany and Poland in the Deutschlandtakt Hamburg, arr. 15:45 hrs Magdeburg, arr. 15:55 hrs Hannover, 14:30 hrs Leipzig, arr. 17:15 hrs Dresden, arr. 17:30 hrs Berlin, 16:15 hrs Szczecin, arr. 17:30 hrs Prague, arr. 19:00 hrs Frankfurt (Oder), 17:15 hrs Wrocław, arr. 22:10 hrs Poznań, 19:00 hrs Gdańsk, arr. 22:56 hrs Warsaw, 21:45 hrs Kraków, arr. 00:50 hrs Connection from/to overnight train Zakopane, arr. 05:50 hrs Blueprint TEE 2.0 | 27.01.2020 | SMA 26 TEE 1/2 A through service from Paris – Warsaw with a journey time of 13h and 15 min will be possible in the short term Today TEE network TEE network (target – Journey time: 15h31 – Journey time: 13h15 timetable) – No of changes: 2 – Through service – Journey time: 12h45 – Change in Cologne – Through service – Change in Berlin – Hamm – Hanover and Hanover – Berlin HSL 300 km/h 09:00 TEE 1 09:00 TEE 1 22:15 21:45 Free onboard WiFi Free onboard WiFi Free onboard entertainment system Free onboard entertainment system Restaurant car and at-seat service of light refreshments Restaurant car and at-seat service of light refreshments Seats facing the direction of travel Seats facing the direction of travel Blueprint TEE 2.0 | 27.01.2020 | SMA 27 TEE 3/4 Amsterdam – Cologne – Basel – Milan – Rome Netherlands Only one direction considered Amsterdam The following slides describe the blueprint based on a train Existing line travelling in one direction. The Köln Messe/Deutz information also applies to the Cologne – Frankfurt HSL opposite direction. The train crosses the train travelling in the Frankfurt Flughafen Germany opposite direction at 14:00 hrs. Prospects in Existing line Deutschlandtakt target Mannheim timetable Basis: 1 daily pair of trains Mannheim – Graben-Neudorf HSL New Frankfurt – Mannheim The basis of the considerations Amsterdam Existing line HSL is the assumption of a daily pair Karlsruhe Seamless high-speed line of trains for each line. Existing line Cologne between Karlsruhe and Basel Basel Bad Bahnhof Infrastructure basis Frankfurt Switzerland Karlsruhe Existing line The blueprint for trains TEE 3/4 is based on the infrastructure as Freiburg Aarau at the end of 2020 Basel Existing line and Gotthard and Ceneri Base Tunnels (commissioning of the Ceneri Base Tunnel) Lugano Milan Existing line Bologna Milan Lambrate Line speed Italy Milano – Roma HSL 300 km/h Perpignan Rome Roma Termini 250 km/h Not all intermediate stops shown Up to 200 km/h Blueprint TEE 2.0 | 27.01.2020 | SMA 28 TEE 3/4 Links to and from the Netherlands and Germany Zandvoort, dep. 07:34 hrs (arr. 08:05 hrs) The Hague, dep. 07:03 hrs (arr. 07:55 hrs) Amsterdam, 08:15 hrs Bruxelles-Midi, dep. 08:23 hrs (arr. 10:15 hrs) Emden, dep. 06:34 hrs (arr. 10:15 hrs) Köln Messe/Deutz, (Change stations in Cologne) 10:45 hrs Frankfurt Flughafen, 11:45 hrs Nuremberg, dep. 09:42 hrs (arr. 12:53 hrs) Karlsruhe, 13:00 hrs Basel Bad Bf, 15:00 hrs Blueprint TEE 2.0 | 27.01.2020 | SMA 29 TEE 3/4 Links to and from Switzerland and Italy Aarau, 15:30 hrs Zürich, arr. 16:00 hrs Arth-Goldau, Zürich, dep. 15:40 hrs 16:15 hrs Lucerne, dep. 15:40 hrs Bellinzona,17:15 hrs Locarno, arr. 17:42 hrs Lugano, 17:30 hrs Milan Lambrate, 18:45 hrs Turin, arr. 20:38 hrs Venice, arr. 21:55 hrs (Change stations in Milan) Bologna, 19:45 hrs Florence Campo di Marte, 20:30 hrs Naples, arr. 23:15 hrs Siracusa, arr. 11:30 hrs Rome, 22:00 hrs Palermo, arr. 12:00 hrs Connection from/to overnight train Blueprint TEE 2.0 | 27.01.2020 | SMA 30 TEE 3/4 Further improvement in links to and from the Netherlands and Germany in the Deutschlandtakt Zandvoort, dep. 07:49 hrs The Hague, dep. 07:33 hrs Amsterdam, 8:30 hrs Bruxelles-Midi, dep. 08:23 hrs Emden, dep. 06:35 hrs Köln Messe/Deutz, (Change stations in Cologne) 11:00 hrs Frankfurt Flughafen, 12:00 hrs Nuremberg, dep. 9:37 hrs Rom, 13:00 hrs Basel Bad Bf, 14:30 hrs Blueprint TEE 2.0 | 27.01.2020 | SMA 31 TEE 3/4 Further improvement in links to and from Switzerland and Italy in the Deutschlandtakt Aarau, 15:00 hrs Zürich, arr. 15:50 hrs Arth-Goldau, Zürich, dep. 15:10 hrs 15:45 hrs Lucerne, dep. 15:18 hrs Bellinzona,16:45 hrs Locarno, arr. 17:12 hrs Lugano, 17:00 hrs Milan Lambrate, 18:15 hrs Turin, arr. 20:38 hrs Venice, arr. 21:55 hrs (Change stations in Milan) Bologna, 19:15 hrs Rimini, arr. 21:12 hrs Florence Campo di Marte, 20:00 hrs Napoli, arr. 23:03 hrs Siracusa, arr. 11:30 hrs Rome, 21:30 hrs Palermo, arr. 12:00 hrs Connection from/to overnight train Blueprint TEE 2.0 | 27.01.2020 | SMA 32 TEE 3/4 A through service from Amsterdam – Rome with a journey time of 13h and 45min will be possible in the short term Today TEE network TEE network (target – Journey time: 16h02 – Journey time: 13h45 timetable) – No of changes: 4 – Through service – Journey time: 13h00 – Through service – New Frankfurt – Mannheim HSL – Seamless Karlsruhe – Basel HSL 08:15 TEE 3 08:30 TEE 3 22:00 22:15 21:30 22:15 Free onboard WiFi Free onboard WiFi Free onboard entertainment system Free onboard entertainment system Restaurant car and at-seat service of light refreshments Restaurant car and at-seat service of light refreshments Seats facing the direction of travel Seats facing the direction of travel Blueprint TEE 2.0 | 27.01.2020 | SMA 33 TEE 5/6 Berlin – Frankfurt – Lyon – Montpellier – Barcelona Berlin VDE 8.3 Only one direction considered Halle The following slides describe VDE 8.2 the blueprint based on a train Erfurt Prospects in travelling in one direction. The Existing line Deutschlandtakt target information also applies to the timetable Germany Frankfurt Süd opposite direction. The train Commissioning of Fulda – Existing line crosses the train travelling in the Frankfurt – Mannheim HSL opposite direction at 14:00 hrs. Mannheim incl. Frankfurt Low-Level Mannheim – Stuttgart HSL, existing line Station Basis: 1 daily pair of trains Karlsruhe Karlsruhe – Offenburg – Basel HSL Berlin The basis of the considerations is the assumption of a daily pair Strasbourg/Krimmeri-Meinau (Current platform length 230 m) Halle Existing line of trains for each line. Erfurt Mulhouse Infrastructure basis Frankfurt LGV Rhin-Rhône; Dijon bypass; LGV Sud-Est Mannheim Lyon Saint-Exupéry TGV France The blueprint for trains TEE 5/6 Karlsruhe Strasbourg/Krimmeri-Meinau is based on present-day Mulhouse LGV Mediterranée infrastructure. Montpellier Existing line Lyon Narbonne Line speed Existing line Montpellier Perpignan 300 km/h Narbonne Perpignan – Barcelona HSL Spain Perpignan 250 km/h Figueras Figueras Barcelona Perpignan – Barcelona HSL Up to 200 km/h Barcelona Blueprint TEE 2.0 | 27.01.2020 | SMA 34 TEE 5/6 Starting in Berlin and picking up travellers from Germany and Switzerland Berlin Hbf, 06.00 Dresden, dep. 05:10 hrs (arr. 07:28 hrs) Leipzig, dep. 06:48 hrs (arr. 07:28 hrs) Erfurt, 07:45 hrs Hamburg, dep. 06:07 hrs (arr. 09:28 hrs) (Change stations in Frankfurt) Frankfurt Süd, 10.00 hrs Cologne, dep. 08:55 hrs (arr. 10:23 hrs) Mannheim, 10:30 hrs Stuttgart, dep. 09:58 hrs (arr. 10:53 hrs) Munich, dep. 07:28 hrs(Change in Stuttgart) Karlsruhe, Luxembourg, dep. 09:24 hrs (additional regular interval train) 11.00 hrs (Change stations in Strasbourg) Strasbourg /Krimmeri- Meinau, Basel, dep. 11:30 hrs (arr. 12:09 hrs) 11:30 hrs Zürich, dep. 10:30 hrs Bern, dep. 10:30 hrs (Change in Basel) Blueprint TEE 2.0 | 27.01.2020 | SMA Mulhouse, 35 12:15 hrs TEE 5/6 Distributing travellers in France and Spain Paris, arr. 15:30 hrs Mulhouse, 12:15 hrs Marseille, arr. 16:30 hrs Lyon St-Exupéry, 14:45 hrs Montpellier, 16:15 hrs Toulouse, arr. 19:30 hrs Barcelona, 19:15 hrs Valencia, arr. 23:30 hrs Madrid, arr. 22:00 hrs Mallorca Other ferry services to Ibiza and North Africa not yet analysed. Blueprint TEE 2.0 | 27.01.2020 | SMA 36 TEE 5/6 Further improvements between Berlin and Barcelona in the Deutschlandtakt Berlin Hbf, 06.15 hrs Dresden, dep. 05:34 hrs Erfurt, 8:00 hrs Leipzig, dep. 07:13 hrs Hamburg, dep. 06:04 hrs Frankfurt Hbf (low-level), 9:45 hrs Cologne, dep. 08:33 hrs Mannheim, 10:15 hrs Stuttgart, dep. 09:25 hrs Munich, dep. 07:41 hrs (Change in Stuttgart) Karlsruhe, Luxembourg, dep. 09:24 hrs (additional regular interval train) 10:45 hrs (Change stations in Strasbourg) Strasbourg /Krimmeri- Meinau, Basel, dep. 11:30 hrs 11:15 hrs Zürich, dep. 10:30 hrs Bern, dep. 10:30 hrs(Change in Basel) Blueprint TEE 2.0 | 27.01.2020 | SMA Mulhouse, 37 12:00 hrs TEE 5/6 Further improvements between Berlin and Barcelona in the Deutschlandtakt Paris, arr. 15:30 hrs Mulhouse, 12:00 hrs Marseille, arr. 16:30 hrs Lyon St-Exupéry, 14:30 hrs Montpellier, 16:00 hrs Toulouse, arr. 19:12 hrs Barcelona, 19:00 hrs Valencia, arr. 23:30 hrs Madrid, arr. 22:00 hrs Mallorca Other ferry services to Ibiza and North Africa not yet analysed. Blueprint TEE 2.0 | 27.01.2020 | SMA 38 TEE 5/6 A through service from Berlin – Barcelona with a journey time of 13h and 15min will be possible in the short term Today TEE network TEE network (target – Journey time: 15h45 – Journey time: 13h15 timetable) – No of changes 4 – Through service – Journey time: 12h45 – Through service – Fulda – Mannheim HSL – Frankfurt Low-Level Station 06:00 TEE 5 06:15 TEE 5 19:15 19:00 Free onboard WiFi Free onboard WiFi Free onboard entertainment system Free onboard entertainment system Restaurant car and at-seat service of light refreshments Restaurant car and at-seat service of light refreshments Seats facing the direction of travel Seats facing the direction of travel Blueprint TEE 2.0 | 27.01.2020 | SMA 39 TEE 7/8 Amsterdam – Brussels – Paris – Lyon – Barcelona Netherlands Only one direction considered Amsterdam The following slides describe HSL-Zuid the blueprint based on a train Rotterdam travelling in one direction. The HSL-Zuid information also applies to the Antwerp Belgium opposite direction. The train Existing line crosses the train travelling in the Brussels opposite direction at 14:00 hrs. LGV Nord Paris-Charles de Gaulle Airport Basis: 1 daily pair of trains The basis of the considerations LGV Interconnex Est, LGV Sud-Est Amsterdam is the assumption of a daily pair Lyon Saint-Exupéry TGV France Rotterdam of trains for each line. Antwerp LGV Mediterranée Brussels Montpellier Infrastructure basis Existing line The blueprint for trains TEE 7/8 Paris-Charles de Gaulle Airport Narbonne is based on present-day Existing line infrastructure. Perpignan Perpignan – Barcelona HSL Spain Lyon Figueras Line speed Perpignan – Barcelona HSL Montpellier 300 km/h Narbonne Barcelona Perpignan 250 km/h Figueras Barcelona Up to 200 km/h Blueprint TEE 2.0 | 27.01.2020 | SMA 40 TEE 7/8 Picking up travellers from the Netherlands and Belgium Amsterdam, 08:15 hrs Zandvoort, dep. 07:34 hrs (arr. 08:05 hrs) The Hague, dep. 07:03 hrs (arr. 07:55 hrs) Eindhoven, dep. 08:13 hrs Rotterdam, dep. 9:30 hrs Antwerp, 10.00 hrs London, dep.07:16 hrs Cologne, dep. 08:43 hrs Bruges, dep.09:31 hrs Brussels, 10:45 hrs Gent, dep. 10:00 hrs Paris Charles de Gaulle Airport, 12.00 hrs Blueprint TEE 2.0 | 27.01.2020 | SMA 41 TEE 7/8 Distributing travellers in France and Spain Paris Charles de Gaulle Airport, 12.00 hrs Marseille, arr. 15:30 hrs Lyon St-Exupéry, 14:00 hrs Montpellier, 15:30 hrs Toulouse, arr. 18:30 hrs Barcelona, 18:30 hrs Madrid, arr. 21:00 hrs Valencia, arr. 22:30 hrs Mallorca Other ferry services to Ibiza and North Africa not yet analysed. Blueprint TEE 2.0 | 27.01.2020 | SMA 42 TEE 7/8 A through service between Amsterdam – Barcelona with a journey time of 10h and 15m will be possible Today TEE network (blueprint and target – Journey time: 11h18 timetable) – No of changes: 2 Journey time: 10h15 (Brussels und Lyon) – Through service 08:15 TEE 7 18:30 Free onboard WiFi Free onboard entertainment system Restaurant car and at-seat service of light refreshments Seats facing the direction of travel Prospects for line TEE 7/8 Potential for upgrade on Montpellier – Perpignan section Implementation not foreseeable Blueprint TEE 2.0 | 27.01.2020 | SMA 43 TEE 9/10 Berlin – Munich – Innsbruck – Bologna – Rome Only one direction considered The following slides describe Berlin Hbf the blueprint based on a train Prospects in travelling in one direction. The VDE 8.3 Deutschlandtakt target information also applies to the Halle Hbf timetable opposite direction. The train  Completion of upgrade on crosses the train travelling in the VDE 8.2 Erfurt – Munich corridor opposite direction at 14:00 hrs. Erfurt Hbf  Completion of Brenner Germany VDE 8.1 northern feeder line in Basis: 1 daily pair of trains Germany Nürnberg Hbf The basis of the considerations Berlin Nürnberg – Ingolstadt HSL is the assumption of a daily pair Existing line of trains for each line. München Hbf Existing line Austria Infrastructure basis Radfeld - Innsbruck HSL Nuremberg Innsbruck Hbf The blueprint for trains TEE 9/10 is based on the infrastructure as Munich Brenner Base Tunnel at the end of the 2020s Bolzano (commissioning of the Brenner Line speed Base Tunnel) Existing line Italy Bologna 300 km/h Bologna Milano – Roma HSL Up to 250 km/h Florence Milano – Roma HSL Up to 200 km/h Rome Roma Termini Blueprint TEE 2.0 | 27.01.2020 | SMA 44 TEE 9/10 Links to and from Germany Hamburg, dep. 05:27 hrs (arr. 07:23 hrs) Berlin, 07:45 hrs Rostock, dep. 04:34 hrs (arr. 07:16 hrs) Leipzig, dep. 08:23 hrs (arr. 08:50 hrs) Halle, 09:00 hrs Dresden, dep. 06:14 hrs (arr. 08:41 hrs) Kassel, dep. 07:05 hrs (arr. 09:21 hrs) Erfurt, 09:30 hrs Frankfurt, dep. 08:22 hrs (arr. 10:27 hrs) Nürnberg, 10:45 hrs Stuttgart, dep. 09:14 hrs (arr. 11:44 hrs) (Change stations in Munich) München Ost, 12:00 hrs Blueprint TEE 2.0 | 27.01.2020 | SMA 45 TEE 9/10 Links to and from Austria and Italy Landeck, arr. 14:31 hrs Innsbruck, around 13:30 hrs Merano, arr. 15:45 hrs Bolzano, 14:15 hrs Bologna, 16:45 hrs Milan, arr. 18:12 hrs Ancona, arr. 18:47 hrs Florence Campo di Marte, 17:30 hrs Naples, arr. 20:48 hrs Rome, 19:00 hrs Siracusa, arr. 09:36 hrs Palermo, arr. 10:08 hrs Connection from/to overnight train Blueprint TEE 2.0 | 27.01.2020 | SMA 46 TEE 9/10 Prospects: through service between Berlin and Rome with a journey time of 10 hours and 15 minutes Today TEE network – Journey time: 14h40 – Journey time: 10h15 – No of changes: 2 (Munich – Through service and Verona) – With Brenner Base Tunnel 07:45 TEE 9 arr. 19:00 Free onboard WiFi Free onboard entertainment system Restaurant car and at-seat service of light refreshments Prospects for line TEE 9/10  Reduction in journey time through completion of Brenner northern feeder line in Germany  Following completion of the upgrade on the Erfurt – Munich line, the journey time will be reduced by 15 minutes Blueprint TEE 2.0 | 27.01.2020 | SMA 47 TEE 11/12 Paris – Stuttgart – Munich – Vienna – Budapest France Only one direction considered Paris Est The following slides describe the blueprint based on a train LGV Est européenne travelling in one direction. The Strasbourg information also applies to the Existing line opposite direction. The train crosses the train travelling in the Karlsruhe Hbf opposite direction at 14:00 hrs. Existing line Bruchsal – Stuttgart HSL Stuttgart Hbf Germany Basis: 1 daily pair of trains New Stuttgart-Ulm HSL The basis of the considerations Prospects in is the assumption of a daily pair Ulm Hbf Deutschlandtakt target of trains for each line. Existing line timetable München Ost  Ulm – Augsburg HSL Infrastructure basis Karlsruhe  Upgraded Munich – Existing line The blueprint for trains TEE Paris Nord Strasbourg Stuttgart Munich Mühldorf – Salzburg line Vienna 11/12 is based on the Stuttgart 21 Ulm Hbf Salzburg Hbf Line speed Salzburg Budapest infrastructure including Stuttgart Existing line Austria 21 and the new Stuttgart—Ulm 300 km/h high-speed line Linz Hbf 250 km/h Westbahn Wien Hbf Up to 200 km/h Existing line Hungary Budapest Keleti Not all intermediate stops shown Blueprint TEE 2.0 | 27.01.2020 | SMA 48 TEE 11/12 Links to and from France and Germany *Paris Austerlitz Toulouse, dep. 22:20 hrs (arr. 06:52* hrs) Briançon, dep. 20:03 hrs (arr. 06:55* hrs) Paris Est, 08:30 hrs Nancy, dep. 08:14 hrs (arr. 9:41 hrs) Mulhouse, dep. 09:16 hrs (arr. 10:09 hrs) Strasbourg, 10:15 hrs Basel SBB, dep. 09:06 hrs (arr. 10:49 hrs) Karlsruhe, 11:00 hrs Zürich, dep. 11:28 hrs (arr. 8:35 hrs) Stuttgart, 11:30 hrs Friedrichshafen, dep. 10:51 hrs (arr. 11:53 hrs) Ulm, 12:15 hrs Blueprint TEE 2.0 | 27.01.2020 | SMA München-Pasing, 49 13:15 hrs TEE 11/12 Links to and From Austria and Hungary München-Ost, 13:30 hrs Salzburg,15:00 hrs Zell am See, arr. 16:45 hrs Linz,16:15 hrs St. Pölten, 17:00 hrs Wien Hbf, 17:30 hrs Bratislava-P., arr. 18:45 hrs Budapest, 19:15 hrs Kyiv, arr. 17:21 hrs Pecs, arr. 22:30 hrs Connection from/to overnight train Blueprint TEE 2.0 | 27.01.2020 | SMA 50 TEE 11/12 Prospects: through service from Paris – Budapest with a journey time of 10h and 55 min Today TEE network – Journey time: 12h39 – Journey time: 10h55 – No of changes: 3 – Through service 08:25 TEE 3 19:20 Free onboard WiFi Free onboard entertainment system Restaurant car and at-seat service of light refreshments Seats facing the direction of travel Prospects for line TEE 11/12  Acceleration in D-Takt with Ulm – Augsburg HSL by 10 minutes  Acceleration through upgraded Munich – Mühldorf – Salzburg line by 15 minutes Blueprint TEE 2.0 | 27.01.2020 | SMA 51 TEE 13/14 Stockholm – Copenhagen – Hamburg – Brussels – Paris Stockholm Only one direction considered The following slides describe Stockholm Sweden the blueprint based on a train Existing line travelling in one direction. The Essen Hbf information also applies to the Malmö Existing line Öresund link opposite direction. The train Duisburg Hbf DNK crosses the train travelling in the Copenhagen Malmö Copenhagen Airport Germany opposite direction at 14:00 hrs. Existing line Fehmarnbelt Fixed Link HSL Lübeck Hbf Düsseldorf Hbf Basis: 1 daily pair of trains Hamburg Existing line Existing line The basis of the considerations Hamburg Harburg Köln Hbf is the assumption of a daily pair Cologne – Aachen HSL Germany Existing line of trains for each line. Existing line Brussels Cologne Bremen Hbf Aachen Hbf Existing line HSL 3 Belgium Infrastructure basis Liège Osnabrück Hbf The blueprint for trains TEE Paris HSL 2 13/14 is based on the Existing line infrastructure as at the end of Brussels Münster Hbf the 2020s (commissioning of the Existing line LGV Nord Fehmarn Belt Fixed Link) Paris Gare du Nord France Line speed Prospects in Deutschlandtakt target 300 km/h timetable Up to 250 km/h  Hamm – Hanover HSL  Hanover – Hamburg HSL Up to 200 km/h Blueprint TEE 2.0 | 27.01.2020 | SMA 52 TEE 13/14 Links to and from Sweden, Denmark and Germany Uppsala, dep. 04:26 hrs (arr. 5:37 hrs) Stockholm, 06:00 hrs Linköping, 08:30 hrs Gothenburg, dep. 06:40 hrs (arr. 9:51 hrs) Malmö, 10:30 hrs Copenhagen Copenhagen Central, dep. 10:27 hrs (arr. 10:40 hrs) Airport 10:45 hrs Kiel, dep. 11:27 hrs (arr. 12:55 hrs) (Change stations in Hamburg) Westerland, dep. 09:26 hrs (arr. 12:55 hrs) Hamburg-Harburg, dep. 13:15 hrs Blueprint TEE 2.0 | 27.01.2020 | SMA 53 TEE 13/14 Links to and from Germany, Belgium and France Oldenburg, arr. 14:53 hrs Bremen Hbf, 14:00 hrs Amsterdam, arr. 19:00 hrs Osnabrück, 14:45 hrs Dortmund, arr. 16:45 hrs Essen Hbf, 16:15 hrs Köln Hbf, 17:15 hrs Frankfurt, arr. 18:31 hrs Brussels, 19:00 hrs London, arr. 21:33 hrs Paris, 20:30 hrs Lyon, arr. 22:56 hrs Blueprint TEE 2.0 | 27.01.2020 | SMA 54 TEE 13/14 Prospects: through service between Stockholm – Paris with a journey time of 14h and 25 min Today TEE network – Journey time: 23h – Journey time: 14h25 – No of changes: 4 – Through service 06:00 TEE 9 arr. 20:35 Free onboard WiFi Free onboard entertainment system Restaurant car and at-seat service of light refreshments Prospects for line TEE 11/12  Operation in the D-Takt via Hanover rather than Bremen is around 40 minutes faster  Acceleration with Hamm – Hanover HSL  Acceleration with Hamburg – Hanover HSL Blueprint TEE 2.0 | 27.01.2020 | SMA 55 TEE 15/16 Stockholm – Copenhagen – Berlin – Munich Stockholm Only one direction considered Sweden The following slides describe Stockholm the blueprint based on a train Existing line travelling in one direction. The Malmö information also applies to the opposite direction. The train Öresund link DNK crosses the train travelling in the Copenhagen Malmö Copenhagen Airport opposite direction at 14:00 hrs. Fehmarnbelt Fixed Link HSL Basis: 1 daily pair of trains Lübeck Hbf The basis of the considerations Berlin Existing line is the assumption of a daily pair Schwerin of trains for each line. Existing line Upgraded Hamburg – Berlin line Prospects in Infrastructure basis Berlin Hbf Nuremberg Deutschlandtakt target Germany The blueprint for trains TEE VDE 8.3 timetable 15/16 is based on the Munich Completion of upgrade on Halle Hbf infrastructure as at the end of Erfurt – Munich corridor the 2020s (commissioning of the VDE 8.2 Fehmarn Belt Fixed Link and Erfurt Hbf Line speed electrification between Lübeck VDE 8.1 and Bad Kleinen. incl. “Bad 300 km/h Kleinen” curve) Nürnberg Hbf Nürnberg – Ingolstadt HSL Up to 250 km/h Existing line Rome München Hbf Up to 200 km/h Blueprint TEE 2.0 | 27.01.2020 | SMA 56 TEE 15/16 Links to and from Sweden, Denmark and Germany Luleå, dep. 16:59 hrs (arr. 06:45 hrs) Stockholm, 08:30 hrs Linköping, 11:00 hrs Oslo, dep. 06:01 hrs (arr. 12:54 hrs) Malmö, 13:00 hrs Copenhagen Copenhagen Central, dep. 12:56 hrs (arr. 13:09 hrs) Airport, 13:15 hrs Kiel, dep. 13:43 hrs (arr. 14:52 hrs) Lübeck Hbf, 15:15 hrs Connection from/to overnight train Blueprint TEE 2.0 | 27.01.2020 | SMA 57 TEE 15/16 Links to and from Germany Rostock, arr. 17:50 hrs Schwerin, 16:15 hrs Dresden, arr. 20:41 hrs Berlin Hbf,17:45 hrs Leipzig, arr. 19:38 hrs Halle Hbf, 19:00 hrs Erfurt Hbf, 19:30 hrs Frankfurt, arr. 21:44 hrs Nürnberg Hbf, 20:45 hrs Regensburg, arr. 22:38 hrs München Hbf, 22:00 hrs Salzburg, arr. 01:42 hrs Budapest, arr. 09:19 hrs Connection from/to overnight train Venice, arr. 8:34 hrs Blueprint TEE 2.0 | 27.01.2020 | SMA 58 TEE 15/16 Prospects: through service between Stockholm – Munich with a journey time of 13h and 30 min Today TEE network – Journey time: 17h17h – Journey time: 13h30 – No of changes: 3 – Through service 08:30 TEE 15 arr. 22:00 Free onboard WiFi Free onboard entertainment system Restaurant car and at-seat service of light refreshments Prospects for line TEE 15/16 Following completion of the upgrade on the Erfurt – Munich line, the journey time will be reduced by 15 minutes Blueprint TEE 2.0 | 27.01.2020 | SMA 59 ROLLING STOCK Certification of rolling stock for deployment on the TEE network TEE 1/2 TEE 3/4 TEE 5/6 TEE 7/8 Paris – Warsaw Amsterdam – Rome Berlin – Barcelona Amsterdam – Barcelona Legend FR X X X X National certification BE X X already exists in some cases DE X X X X National certification PO X not yet available for the proposed rolling NL X X stock blueprint CH X IT X ESP X X Proposed rolling stock blueprint TGV-TEE with Velaro-TEE Velaro-TEE Velaro-TEE certification for certification for Poland Switzerland and Italy Blueprint TEE 2.0 | 27.01.2020 | SMA 60 ROLLING STOCK Certification of rolling stock for deployment on the TEE network TEE 9/10 TEE 11/12 TEE 13/14 TEE 15/16 Berlin – Rome Paris – Budapest Stockholm - Munich Paris – Stockholm FR X X Legend X National certification BE X already exists in some cases DE X X X X X National certification AT X* X not yet available for the proposed rolling HU X stock blueprint DK X X * = Brenner Base Tunnel is SWE X X electrified at 25 kV AC IT X Proposed rolling stock blueprint Velaro-TEE TGV-TEE with TGV-TEE with Velaro-TEE with certification for certification for certification for certification for Switzerland and Austria and Scandinavia Scandinavia Italy Hungary Blueprint TEE 2.0 | 27.01.2020 | SMA 61 ROLLING STOCK In Western Europe, there are currently only a few BASICS operators of overnight train services Minimum requirement – 2 lines Rolling stock that operates on only one overnight line is not taken into account in the Designation UIC standard cars (wide range of different cars Trenhotel, Talgo RZD, InterCityNight adjacent table. and country combinations) (no longer in operation) General comment: overnight Manufacturer Various Talgo train services are operated only by locomotive-hauled trains. Licensed in FR X X (Trenhotel) DE X X (InterCityNight, Talgo RZD) New NightJet BE X ÖBB is planning to purchase new sleeper and couchette cars NL X for operation in Austria, ESP X X (Trenhotel) Germany, Switzerland and Italy. CH X X (Trenhotel) AT X IT X X (Trenhotel) PO X X (Talgo RZD) HU X DK X SWE X Maximum speed up to 200 km/h 140-250 km/h Blueprint TEE 2.0 | 27.01.2020 | SMA 62 21/22 Paris – Brussels – Cologne – Berlin France Only one direction considered Paris Gare du Nord The following slides describe LGV Nord (vmax: 200 km/h) the blueprint based on a train travelling in one direction. The Bruxelles-Midi Belgium information also applies to the Existing line opposite direction. HSL 2 (vmax: 200 km/h) Liège Basis: 1 daily pair of trains HSL 3 (vmax: 200 km/h) The basis of the considerations Aachen Hbf is the assumption of a daily pair Existing line Germany Berlin of trains for each line. Hanover Düren – Cologne HSL (vmax : 200 km/h) Köln Hbf Existing line Infrastructure basis Brussels Cologne Wolfsburg – Berlin HSL (vmax : 200 km/h) The blueprint for trains TEEN Berlin Hbf 21/22 is based on present-day infrastructure. Paris Not all intermediate stops shown Blueprint TEE 2.0 | 27.01.2020 | SMA 63 21/22 Paris – Brussels – Cologne – Berlin Paris Gare du Nord Bruxelles-Midi, Liège, Aachen, Köln Hbf, Berlin Hbf, 21:30 hrs 23:30 hrs 00:30 hrs 01:15 hrs 02:15 hrs 07:45 Journey time Paris – Berlin 10 h15 min Blueprint TEE 2.0 | 27.01.2020 | SMA * Paris Montparnasse 64 ** Paris Bercy 23/24 Brussels – Cologne – Berlin – Prague/Warsaw Only one direction considered Brussels Belgium The following slides describe HSL 2 (vmax: 200 km/h) the blueprint based on a train travelling in one direction. The Liège information also applies to the HSL 3 (vmax: 200 km/h) opposite direction. Aachen Hbf Existing line Basis: 1 daily pair of trains Düren – Cologne HSL (vmax : 200 km/h) The basis of the considerations Köln Hbf is the assumption of a daily pair Germany Berlin Existing line of trains for each line. Hanover Warsaw Hannover Hbf Existing line Infrastructure basis Brussels Cologne Dresden Wolfsburg – Berlin HSL (vmax : 200 km/h) The blueprint for trains TEEN Prague Berlin Hbf Berlin Hbf 23/24 is based on present-day infrastructure. Existing line Existing line Paris Frankfurt (Oder) Dresden Hbf Czech Republic Existing line Existing line Poland Poznań Prague Existing line Warsaw Not all intermediate stops shown Blueprint TEE 2.0 | 27.01.2020 | SMA 65 23/24 Brussels – Cologne – Berlin – Prague/Warsaw Warsaw 09:15 hrs Poznań 06:30 hrs Bruxelles-Midi, Liège, Aachen, Köln Hbf, Berlin Hbf, Kraków, arr. 12:02 hrs 19:30 hrs 20:30 hrs 21:15 hrs 22:15 hrs 03:45 hrs Brest, arr. 19:10 hrs Moscow, arr. 08:50 hrs (+1) Olsztyn, arr. 10:15 hrs Gdańsk, arr. 10:37 hrs Dresden Hbf, Prague, 06:00 hrs 08:30 hrs Brno, arr: 11:19 hrs Bratislava, arr. 13:45 hrs Journey time Brussels – Warsaw: 14 h 45 min Journey time Brussels – Prague: 14h Blueprint TEE 2.0 | 27.01.2020 | SMA 66 25/26 Amsterdam – Cologne – Basel – Milan – Venice/Genoa Netherlands Only one direction considered Amsterdam The following slides describe the blueprint based on a train Existing line travelling in one direction. The Cologne information also applies to the Cologne – Frankfurt HSL (vmax : 200 km/h) opposite direction. Frankfurt Flughafen Germany Basis: 1 daily pair of trains Existing line The basis of the considerations Mannheim is the assumption of a daily pair Mannheim – Graben-Neudorf HSL(vmax : 200 km/h) of trains for each line. Amsterdam Existing line Karlsruhe Infrastructure basis Cologne Existing line The blueprint for trains TEEN Basel Bad Bahnhof Frankfurt 25/26 is based on the Switzerland Karlsruhe Existing line and Gotthard Tunnel infrastructure as at the end of 2020 (commissioning of the Bellinzona Ceneri Base Tunnel) Basel Existing line and Ceneri Base Tunnel Lugano Milan Venice Existing line Genoa Milan Italy Existing line Perpignan Genoa/Venice Not all intermediate stops shown Blueprint TEE 2.0 | 27.01.2020 | SMA 67 25/26 Amsterdam – Cologne – Basel – Milan – Venice/Genoa Turin, arr. 8:45 hrs Rimini, arr. 10:40 hrs Rome, arr. 11:10 hrs Rimini, arr. 15:50 hrs Venice, 10:30 hrs Amsterdam, Köln, Basel Bad Bf, Lugano, Milan, 20:00 hrs 22:45 hrs 03:30 hrs 06:00 hrs 07:30 hrs Trieste, arr. 12:44 hrs Genoa, 09:00 hrs Pisa, arr. 11:00 hrs Journey time Amsterdam – Venice: 14 h 30 min Journey time Amsterdam – Genoa: 13 h Blueprint TEE 2.0 | 27.01.2020 | SMA 68 27/28 Frankfurt/Zürich – Lyon – Montpellier – Barcelona Germany Only one direction considered Frankfurt Hbf The following slides describe Riedbahn the blueprint based on a train Mannheim travelling in one direction. The Mannheim – Karlsruhe HSL(vmax : 200 km/h) information also applies to the Switzerland Karlsruhe Zürich HB opposite direction. Karlsr. – Offenb. HSL (vmax : 200 km/h) Existing line Strasbourg Basel SBB Basis: 1 daily pair of trains Existing line Existing line The basis of the considerations Mulhouse Mulhouse is the assumption of a daily pair of trains for each line. LGV Rhin-Rhône; Dijon bypass; LGV Paris-Lyon (vmax 200 km/h) France Lyon LGV Lyon – Marseille/Montpellier (vmax : 200 km/h) Infrastructure basis The blueprint for trains TEEN Montpellier Frankfurt Existing line 27/28 is based on present-day Mannheim infrastructure. Karlsruhe Narbonne Strasbourg Mulhouse Basel Existing line Zürich Perpignan Perpignan – Barcelona HSL (vmax : 200 km/h) Spain Lyon Figueras Perpignan – Barcelona HSL (vmax : 200 km/h) Montpellier Narbonne Barcelona Perpignan Figueras Barcelona Blueprint TEE 2.0 | 27.01.2020 | SMA 69 27/28 Frankfurt/Zürich – Lyon – Montpellier – Barcelona Nuremberg, dep. 17:42 hrs Frankfurt Cologne, 18:55 hrs 20:00 hrs Karlsruhe, 21:15 hrs Toulouse Strasbourg, arr. 07:40 hrs 22:00 hrs Mulhouse, Lyon, Montpellier Narbonne, Barcelona, 23:00 hrs 02:30 hrs 05:00 hrs, 06:00 hrs 08:45 hrs Berlin, dep. 15:33 hrs Hamburg, dep. 16:24 hrs Biel, dep. 20:49 hrs Lucerne, dep. 20:54 hrs Bern, dep. 21:04 hrs Madrid, arr. 11:45 hrs Zürich HB, Valencia, arr. 12:00 hrs 21:00 hrs Basel, Chur, dep. 19:16 hrs 22:15 hrs Journey time Frankfurt – Barcelona: 14 h 45 min St. Gallen, dep. 19:37 hrs Journey time Zürich – Barcelona: 11 h 45 min Blueprint TEE 2.0 | 27.01.2020 | SMA 70 29/30 Berlin – Munich – Innsbruck – Bologna – Rome/Genoa – Nice Only one direction considered The following slides describe Berlin Hbf the blueprint based on a train travelling in one direction. The Existing line information also applies to the Halle Hbf opposite direction. Halle – Erfurt HSL (vmax : 200 km/h) Erfurt Hbf Germany Basis: 1 daily pair of trains The basis of the considerations Erfurt – Nuremberg HSL (vmax : 200 km/h) is the assumption of a daily pair Nürnberg Hbf of trains for each line. Berlin Nuremberg – Ingolstadt HSL (vmax : 200 km/h) Existing line Infrastructure basis München Hbf Existing line The blueprint for trains TEEN Radfeld – Innsbruck HSL (vmax : 200 km/h) Austria 29/30 is based on present-day Nuremberg Innsbruck Hbf infrastructure. Munich Existing line Bolzano Existing line Italy Milan Verona Verona Verona Genoa Bologna Verona – Milano HSL Nice Milano – Roma HSL (vmax : 200 km/h) (vmax : 200 km/h) Bologna Milan Milano – Roma HSL (vmax : 200 km/h) Existing line Rome Roma Termini Nice Not all intermediate stops shown Blueprint TEE 2.0 | 27.01.2020 | SMA 71 29/30 Berlin – Munich – Innsbruck – Bologna – Rome/Genoa – Nice Nice, Genoa PP, 11:30 hrs 08:30 hrs Milan, 06:30 hrs Berlin, Nürnberg, München Hbf, Innsbruck Hbf, Verona PN 18:40 hrs 22:15 hrs 23:45 hrs 01:15 hrs 04:30 hrs La Spezia, arr. 10:10 hrs Turin, arr. 8:00 hrs Rome 08:30 hrs Bologna Centrale, Napoli, 05:30 hrs arr. 10:00 hrs Journey time Berlin – Nice: 16 h 50 min Journey time Berlin – Rome: 13 h 50 min Blueprint TEE 2.0 | 27.01.2020 | SMA 72 31/32 Paris – Stuttgart – Munich – Vienna – Budapest/ Zagreb France Only one direction considered Paris Est The following slides describe the blueprint based on a train LGV Paris – Strasbourg (vmax : 200 km/h) travelling in one direction. The Strasbourg information also applies to the Existing line opposite direction. Karlsruhe Hbf Existing line Basis: 1 daily pair of trains Milano – Roma HSL (vmax : 200 km/h) The basis of the considerations Stuttgart Hbf Germany is the assumption of a daily pair Existing line of trains for each line. Ulm Hbf Infrastructure basis Existing line The blueprint for trains TEEN München Ost 31/32 is based on present-day Karlsruhe Existing line infrastructure. Paris Nord Strasbourg Stuttgart Munich Vienna Stuttgart 21 Ulm Hbf Salzburg Hbf Salzburg Hbf Salzburg Budapest Existing line Existing line Austria Villach Ljubljana Zagreb Linz Hbf Villach Hbf Linz – Vienna HSL (vmax : 200 km/h) Existing line Wien Hbf Slovenia Ljubljana Existing line Existing line Hungary Croatia Budapest Keleti Zagreb Not all intermediate stops shown Blueprint TEE 2.0 | 27.01.2020 | SMA 73 31/32 Paris – Stuttgart – Munich – Vienna – Budapest/ Zagreb Budapest Keleti 09:20 hrs Wien Hbf, 06:30 hrs Paris Est Strasbourg, Stuttgart, München Hbf, Salzburg Hbf, 20:00 hrs 22:30 hrs 00:00 hrs 02:30 hrs 04:00 hrs Pecs, arr. 12:30 hrs Bratislava-P., arr. 7:45 hrs Koper, arr. 11:15 hrs Villach Hbf, 06:30 hrs Ljubljana, Zagreb, 08:15 hrs 10:50 hrs Belgrade, arr. Klagenfurt, arr. 7:20 hrs 17:30 hrs Journey time Paris – Budapest: 13 h 10 min Journey time Paris – Zagreb: 14 h 50 min Blueprint TEE 2.0 | 27.01.2020 | SMA 74 * Paris Montparnasse 33A/34A Copenhagen – Hamburg – Brussels – Paris/ Amsterdam Only one direction considered The following slides describe Copenhagen the blueprint based on a train Öresund link travelling in one direction. The Kolding Denmark information also applies to the opposite direction. Existing line Copenhagen Padborg Basis: 1 daily pair of trains Existing line The basis of the considerations Hamburg Hbf Hamburg is the assumption of a daily pair Existing line of trains for each line. Amsterdam Hannover Hbf Germany Existing line Infrastructure basis Brussels Cologne Köln Hbf Köln Hbf The blueprint for trains TEEN Cologne – Aachen HSL (vmax : 200 km/h) 33A/34A is based on present- Existing line Aachen Hbf Existing line day infrastructure. Paris Netherlands HSL 2 (vmax: 200 km/h) Belgium Amsterdam Liège HSL 3 (vmax: 200 km/h) Brussels LGV Nord (vmax: 200 km/h) Paris Gare du Nord France Not all intermediate stops shown Blueprint TEE 2.0 | 27.01.2020 | SMA 75 33A/34A Copenhagen – Hamburg – Brussels – Paris/ Amsterdam Utrecht, Amsterdam, 07:45 hrs 08:15 hrs Copenhagen, Kolding, Hamburg Hbf, Hannover Hbf, Köln Hbf, 19:30 hrs 21:15 hrs 00:15 hrs 02:00 hrs 05:30 hrs The Hague, arr. 09:12 hrs Gent, arr. 08:56 hrs Bruges, arr. 09:30 hrs Liege-G., 06.45 hrs Paris, Brussels, 10:15 hrs 08:15 hrs Bordeaux, arr. Namur, arr. 7:43 hrs 12:56 hrs* Journey time Copenhagen – Amsterdam 12 h 45 min Journey time Copenhagen – Paris 14 h 45 min Blueprint TEE 2.0 | 27.01.2020 | SMA 76 * Departure from Paris Montparnasse 33B/34B Stockholm – Copenhagen – Hamburg – Brussels – Paris Stockholm Only one direction considered The following slides describe Stockholm Sweden the blueprint based on a train Existing line travelling in one direction. The information also applies to the Malmö Öresund link opposite direction. The train DNK crosses the train travelling in the Copenhagen Malmö Copenhagen Airport opposite direction at 14:00 hrs. Fehmarnbelt Fixed Link HSL (vmax: 200 km/h) Lübeck Hbf Basis: 1 daily pair of trains Hamburg Existing line The basis of the considerations Hanover Hamburg Hbf is the assumption of a daily pair Germany Existing line of trains for each line. Brussels Cologne Hannover Hbf Existing line Infrastructure basis Köln Hbf The blueprint for trains TEEN Paris Cologne – Aachen HSL (vmax : 200 km/h) 33B/34B is based on the Existing line infrastructure as at the end of Aachen Hbf the 2020s (commissioning of the HSL 3 (vmax: 200 km/h) Belgium Fehmarn Belt Fixed Link) Liège HSL 2 (vmax: 200 km/h) Brussels LGV Nord (vmax: 200 km/h) Paris Gare du Nord France Blueprint TEE 2.0 | 27.01.2020 | SMA 77 33B/34B Stockholm – Copenhagen – Hamburg – Brussels – Paris Utrecht, Amsterdam, 07:45 hrs 08:15 hrs Copenhagen Stockholm, Airport Hamburg Hbf, Hannover Hbf, Köln Hbf, 16:30 hrs 21:15 hrs 00:15 hrs 02:00 hrs 05:30 hrs The Hague, arr. 09:12 hrs Gent, arr. 08:56 hrs Bruges, arr. 09:30 hrs Liege-G., 06:45 hrs Paris, Brussels, 10:15 hrs 08:15 hrs Bordeaux, arr. Namur, arr. 07:43 hrs 12:56 hrs* Blueprint TEE 2.0 | 27.01.2020 | SMA 78 * Departure from Paris Montparnasse 35 A/36 A Copenhagen – Berlin – Prague – Vienna/Budapest Only one direction considered The following slides describe Copenhagen the blueprint based on a train Öresund link travelling in one direction. The Kolding Denmark information also applies to the opposite direction. Existing line Copenhagen Padborg Basis: 1 daily pair of trains Existing line The basis of the considerations Hamburg Hbf Hamburg Germany is the assumption of a daily pair Existing line of trains for each line. Berlin Berlin Hbf Existing line Infrastructure basis Dresde n Dresden Hbf Hungary SlovakiaCzech Republic The blueprint for trains TEEN Prague Existing line 35A/36A is based on present- Breclav Prague Holesovice day infrastructure. Vienna Existing line Budapest Breclav Breclav Existing line Existing line Austria Bratislava Wien Hbf Existing line Budapest Keleti Rome Not all intermediate stops shown Blueprint TEE 2.0 | 27.01.2020 | SMA 79 TEEN 35A/36A Copenhagen – Berlin – Prague – Vienna/Budapest Budapest Bratislava, Keleti, 08:05 hrs 10:40 hrs Copenhagen, Kolding, Hamburg Hbf, Berlin Hbf, Prague Breclav, 17:30 hrs 19:15 hrs 22:00 hrs 00:00 hrs 04:15 hrs, 07:15 hrs, Szolnok, arr. 12:30 hrs Zilina, arr. 10:40 hrs Zilina, arr. 13:53 hrs Wien, 08:15 hrs Klagenfurt, arr. 12:20 hrs, Journey time Copenhagen – Budapest: 17 h 10 min Journey time Copenhagen – Vienna: 14 h 45 min Blueprint TEE 2.0 | 27.01.2020 | SMA 80 35B/36B Stockholm – Copenhagen – Berlin – Prague – Vienna/Budapest Only one direction considered Stockholm The following slides describe Stockholm Sweden the blueprint based on a train Existing line travelling in one direction. The information also applies to the Malmö Öresund link opposite direction. DNK Copenhagen Copenhagen Airport Basis: 1 daily pair of trains Fehmarnbelt Fixed Link HSL (vmax: 200 km/h) The basis of the considerations Lübeck Lübeck Hbf Germany is the assumption of a daily pair Existing line of trains for each line. Berlin Berlin Hbf Existing line Infrastructure basis Dresde n Dresden Hbf Hungary SlovakiaCzech Republic The blueprint for trains TEE Prague Existing line 35B/36B is based on the Breclav Prague Holesovice infrastructure as at the end of the 2020s (commissioning of the Vienna Existing line Fehmarn Belt Fixed Link) Budapest Breclav Breclav Existing line Existing line Austria Bratislava Wien Hbf Existing line Budapest Keleti Rome Not all intermediate stops shown Blueprint TEE 2.0 | 27.01.2020 | SMA 81 TEEN 35B/36B Stockholm – Copenhagen – Berlin – Prague – Vienna/Budapest Budapest Bratislava, Keleti, Copenhagen 08:05 hrs 10:40 hrs Stockholm, Airport Lübeck Hbf Berlin Hbf, Prague Breclav, 14:30 hrs, 19:15 hrs 21:30 hrs 00:00 hrs 04:15 hrs, 07:15 hrs, Szolnok, arr. 12:30 hrs Zilina, arr. 10:40 hrs Kosice, arr. 13:53 hrs Wien, 08:15 hrs Klagenfurt, arr. 12:20 hrs, Journey time Stockholm – Budapest: 20 h 10 min Journey time Copenhagen – Vienna: 17 h 45 min Blueprint TEE 2.0 | 27.01.2020 | SMA 82 Translation Subject: Implementation of the Trans Europ Express 2.0 strategy Original reference: Ministerial conference on 21 September 2020 Our ref: GS-BSV 149.2/0 Date: Berlin, 17.11.2020 Page 1 of 3 Dear colleagues, At the virtual ministerial conference on “Innovative Rail Transport – connecting, sustainable, digital”, which was held under the auspices of the German Council Presidency on 21 September 2020, we also discussed the strategy for a Trans Europ Express 2.0 for strengthening international high-speed and overnight rail services to promote climate change mitigation. I was delighted to hear your interventions and your support for the strategy. I consider TEE 2.0 to be a vision for a Europe that is growing even closer together. By linking up existing regular interval services, it will be a major step towards the evolution of a trans- European network of long-distance passenger rail services. At this point, I believe it is important to explicitly point out once again that all Member States, including the EFTA states, and railway undertakings can contribute to the implementation of the TEE 2.0 strategy. The proposals for actual lines contained in the blueprint study are in no way to be seen as final. Rather, I would like to see them understood as an inspiration for the specific cooperation between the Member States and railway undertakings, which is to be agreed in the next step. If the TEE 2.0 strategy is to be successfully implemented, we need above all the commitment and cooperation of the railway undertakings. Examples of good practice already show us today that international services can be delivered commercially if the general conditions are right. But implementation should also be actively supported and monitored by the government. Germany has agreed to coordinate the next steps of our cooperation. I would appreciate it if 20-1429-GS-BSV you could assist us as we go forward by whetting the appetite of all railway undertakings operating in your country for the TEE 2.0 strategy and naming interested undertakings. Against this background, I suggest – as I announced on 21 September 2020 – that those countries that wish to support the TEE 2.0 strategy state this desire in a joint letter of intent by the end of November. Subsequently, the exchange of details between railway undertakings, Member States and the European Commission, which is necessary for delivery of the project, should commence at the level of experts. I have enclosed a draft of such a letter of intent with this letter. I would like to invite you not just to express your basic willingness to participate in the TEE 2.0 strategy but also to propose services that you consider suitable. This can also be the upgrading of an existing service. To achieve a new quality of service and set it apart from the established system of EuroCity trains, I suggest the following requirements that would have to be met by a TEE 2.0 service.  A TEE 2.0 should link at least three states or two states if the total length of the route is at least 600 km.  A TEE 2.0 should reach a running speed of at least 160 km/h on most of its route or an average speed of 100 km/h relative to the total length of the train’s route.  A TEE 2.0 should offer an enhanced level of comfort (free Wi-Fi, air conditioning, catering facilities and possibly sleeping cars/couchettes or other amenities on overnight trains) compared with conventional passenger trains. If you have any questions, please do not hesitate to contact the experts in the secretariat of my Parliamentary State Secretary and Federal Government Commissioner for Rail Transport, Enak Ferlemann, by email [email protected] or tel. +49-30-18300-2280. I would appreciate it if you could reply by 27 November 2020, informing me about your participation in the letter of intent and suggesting services that you consider suitable. Our common goal should be to finalize the letter of intent before the end of December 2020 so that we can already commence the expert discussions in January 2021. The European Year of Rail 2021 proposed by the European Commission provides a good framework for the first concrete steps towards the implementation of our common goal – connectivity between our capital cities and commercial hubs by means of through long- distance high-speed services. Yours faithfully, (sgd) Andreas Scheuer, Member of the German Bundestag Enclosures - Draft letter of intent - TEE 2.0 Blueprint Study 2.0 Absichts erklärung Grenzüberschreitender Hochgeschwindigkeits- und Nachtverkehr auf der Schiene Wir, die unterzeichnenden Verkehrsminister und die Europäische Kommission , wollen den grenzüberschreitenden Personen fern verkehr auf der Schiene in Europa weiter fördern und streben hierzu durchgängige Hochgeschwindigkeits- und Nachtzug verbindungen zwischen den Hauptstädten sowie den wirtschaftlichen und kulturellen Zentren Europas an. Wir bekennen uns daher zu r politischen Unterstützung des Konzept es eines neuen Trans Europ Express , kurz TEE 2.0 , als Symbol der weiteren europäischen Integration und Beitrag zu einer erschwingliche n und klimafreundliche n Mobilität für die europäischen Bürger . Zu diesem Zwecke werden wir: die beteiligten Bahnen bei der Entwicklung von grenzüberschreitenden Personenfernverkehrsa ngeboten im Rahmen des TEE 2.0 b egleiten und politisch u nterstützen . zusammen arbeiten und, sofern erforderlich, Gespräche zu grenzüberschreitenden Verbindungen mit den beteiligten Bahnen und S taaten moderieren . diskutieren , wie die Schaffung , von Taktverkehre n und deren Vernetzung zu einem Europatakt vereinfacht werden können . uns für weitere technische und betriebliche Verbesserungen, die zur Durchführung grenzüberschreitender Eisenbahnverkehre notwendig sind, einsetzen . die E uropäische K ommission bitten , die Aufsetzung e in es EU-Förderprogramm s für Investitionen in grenzüberschreitend nutzbare Fahrzeuge zur Unterstützung de r Ziele de s European Green Deal s vorzuschlagen . die Aktivitäten des Bahnsektors zur Entwicklung einer interoperablen Buchungsplattform auf Basis des Full-Service-Modell s begrüßen und die Unternehmen ermutigen , diese Plattform rasch den europäischen Reisenden zur Verfügung zu stellen. die Realisierungsmöglichkeit der in der Anlage enthaltenen Verbindungen für einen TEE 2.0 mit den Eisenbahnverkehrsunternehmen diskutieren . bis Anfang 2021 d ie Eisenbahn verkehrs unternehmen benennen, die das Konzept eines TEE 2.0 unterstützen und umsetzen. Diese Absichtserklärung ist für den Beitritt weiterer unterstützender Staaten offen; der Beitritt erfolgt durch bestätigenden Noten-Austausch. XX. Dezember 2020 Unterschriften der unterstützenden Minister Anlage – Mögliche Verbindungen für einen TEE 2.0, die mit den Eisenbahnverkehrsunternehmen zu diskutieren sind: Stufe 1: zeitnahe Realisierung München – Bregenz – Zürich – Mailand Berlin – Prag – Wien Berlin – Strasbourg – Barcelona Paris – Brüssel – Berlin – Warschau &lt;zu ergänzen &gt; … Stufe 2: Realisierung bis Mitte der 2020er Jahre Hamburg – Basel – Mailand Kopenhagen – Hamburg – Amsterdam Amsterdam – München – Wien Amsterdam – Berlin – Warschau Amsterdam – Köln – Basel – Rom &lt;zu ergänzen &gt; … Stufe 3: Realisierung bis Ende der 2020er Jahre Berlin – Innsbruck – Rom Stockholm – Kopenhagen – Hamburg – Paris Hamburg – Bordeaux – Madrid Kopenhagen – Berlin – Prag &lt;zu ergänzen &gt; … Saatja: Silver Tammik <[email protected]> Saadetud: 23.11.2020 16:33 Adressaat: MKM info <[email protected]> Koopia: Meelis Kivinurm MFA <[email protected]>; Yana Laurand <[email protected]> Teema: FW: Letter of Intent by the Federal Minister of Transport and Digital Infrastructure, Andreas Scheuer Manused: Ministerschreiben_TEE2.pdf; Translation.pdf; Konzeptstudie TTE 2.0.pdf; TEE 2.0 Blueprint Study.pdf; Entwurf Letter of Intent.docx; Draft Letter of Intent.doc Palun registreerida. -----Original Message----- From: Taavi Aas Sent: Saturday, November 21, 2020 11:13 AM To: Silver Tammik <[email protected]> Subject: FW: Letter of Intent by the Federal Minister of Transport and Digital Infrastructure, Andreas Scheuer -----Original Message----- From: EU2020 <[email protected]> Sent: Friday, November 20, 2020 7:17 PM To: EU2020 <[email protected]> Subject: Letter of Intent by the Federal Minister of Transport and Digital Infrastructure, Andreas Scheuer Dear Ministers, Please find attached a letter of intent by the Federal Minister of Transport and Digital Infrastructure, BM Andreas Scheuer, in the aftermath to the ministerial conference "Innovative Rail Transport - connecting, sustainable, digital", which was held under the auspices of the German EU Council Presidency on 21 September 2020. Yours sincerely, EU Council Presidency Secretariat of the Federal Ministry of Transport and Digital Infrastructure
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →