Long-term strategy for building
renovation
Tallinn
July 2020
1 Summary The main goal of this long-term renovation strategy is the full
renovation, by 2050, of buildings erected before 2000. The depth of
full renovation is reflected in the minimum required energy
performance of a building after a major renovation, which, according
to the Estonian energy performance regulations, currently is class C1.
The strategy has the following central principles:
Cost-effective application of energy efficiency requirements
Energy and resource efficiency; in addition to the energy
performance of buildings, taking into account the
environmental impact of the construction materials and
processes.
Regional balance
Ensuring renovation and balanced volumes of living quarters
in functional region and second-tier centres.
Quality of living and working environment
Ensuring the healthy interior climate, improving accessibility
and functionality as well as abiding by the basic principles for
high-quality space2 in the solutions for buildings and public
spaces during the renovation.
Technological development
The development of renovation solutions and technologies to
improve the sustainability of the renovated buildings and
reduce renovation costs.
Climate change mitigation and adaptation
Climate change mitigation, reduction of the carbon intensity
of buildings, buildings that contribute towards climate
neutrality.
The strategy that ensures energy savings, the healthy interior climate
The strategy is human- in buildings and a high-quality spatial environment is estimated to
centred: the living and improve the living and working conditions of 80% of Estonian citizens.
working conditions of 80% of The renovation of homes and workspaces as well as tearing down all
Estonia’s citizens will derelict buildings will make the building stock safer, of better aesthetic
improve in renovated, safe quality, better for health, better accessible for all population groups
and affordable buildings. and more affordable. For towns with a shrinking population, the
strategy points to the need and opportunities for taking into account
the population and infrastructure development principles in zoning
and opportunities for concentrating the town centres. In urban areas
where the population is getting older and smaller, it is important to
not only demolish underused buildings but also to ensure full
functionality of the urban space, using demolition as an opportunity
to improve the availability of public services and the functions needed
for the functioning of urban areas, by gathering these into synergistic
spatial ecosystems.
Considering the number of existing buildings, the percentage of
141,000 buildings of already renovated buildings and the projected numbers of buildings
54 million square metres in falling out of use, the number of private houses needing renovation is
total need renovation within ~100,000, their total floor area being 14 million square metres,
30 years. ~14,000 apartment buildings (18 M m2) and ~27,000 non-residential
2
buildings (22 M m2). To attain this target, it is necessary to establish,
in addition to the final goal to be achieved in 30 years, the expected
results and milestones of the strategy for 2030, 2040 and 2050. The
introduction and large-scale launch of full renovation take time
because this activity requires a learning process, qualified labour as
well as the emergence of renovation-oriented enterprises and
production.
As the full renovation of buildings needs large investments, it is
The removal of market important that as large a share of the renovation as possible be done
failures will encourage on the initiative of building owners and be financed by them as well.
property owners to make The current renovation market includes the construction volumes
investments. needed for achieving this goal in all building categories except small
residential buildings. However, in many cases, the renovation does not
result in improved energy performance or the improvement is
negligible. As to the cost-effective improvement of energy
performance, the main bottlenecks that can be deemed to be the
market failures the strategy will need to eliminate are:
The buildings are renovated not to save energy but for other
reasons, e.g. to improve interior climate or functionality. When
renovating a building due to other reasons, the work needed for
improving its energy performance might not be done.
Property owners do not have enough financial capacity to
renovate their buildings to achieve energy class C.
When renovating, property owners often do not simultaneously
think of sustainability, health and energy efficiency in a 20- to 30-
year perspective, and they have a legitimate expectation to
receive government support for achieving the objective the
government has set.
To eliminate the problems, support measures and other stimulating
measures are needed. The measures have to affect not the launch of
Effective measures make
renovation deeper.
the renovation but the depth of it. If a property owner launches a
renovation for some reason, the measure must help them with
additional work needed to achieve energy class C. When applying
these measures, the majority of the investments will be made by the
private sector. The baseline situation in the main building categories
is as follows:
For a private house of average size, the cost of full renovation is
around €60,000, which is too big an investment for many
households to make at once. Therefore, most owners of private
houses renovate their property step by step. For private houses,
the full renovation market has not developed yet, and renovation
volumes need to grow by many times.
1
Tallinn University of Technology. Analysis of cost-optimal minimum energy efficiency requirements for
buildings. 2017
2
Kvaliteetse ruumi aluspõhimõtted [Basic principles for high-quality space]:
https://www.kul.ee/sites/kulminn/files/lisa_3_-_kvaliteetne_ruum_aluspohimotted.pdf
3
The success story of Apartment buildings have been fully renovated in Estonia for 10
apartment building years already, allegedly with the best results compared to the rest
renovations awaits repetition of the EU. The financing system, the technical solutions and
in other building categories.
apartment associations’ desire to renovate are there. The 50%
energy savings achieved are accompanied by a healthy interior
climate. Due to apartment building renovations, the energy
consumption of dwellings has remained the same within the past
15 years, despite the construction of new buildings, i.e. increasing
building stock. The main bottleneck has been the unstable
financing of support measures.
In the public sector, the Energy Performance of Buildings Directive
includes an obligation for central governments to renovate at
least 3% of buildings that have a total useful floor area of over
250 square metres and do not comply with the minimum
requirements, so that these meet the minimum requirements
afterwards. The renovation of municipal buildings has primarily
depended on the various support measures.
The full renovation of
commercial property has not The commercial property sector renovates on market conditions.
started yet. The main work done includes smaller renovation and work that
offers quick returns on the investment, but the result is by far
worse than class C, and as there is no carbon taxation on final
consumption, the property owners have no motivation to invest
in energy performance. However, the professional competence to
design and implement the required solutions is there. The market
situation shows that there is a need to motivate non-residential
building owners in the private sector to invest in renovations that
take longer to pay off.
Financial support, loans and
guarantees, the The possible renovation-related measures proposed in this strategy
development of new include financial measures (loans, guarantees and financial support),
technologies and know-how development of new technologies (prefabrication, digital tools, simple
as well as investments into energy calculators for building owners), awareness raising (guidance
residential buildings will materials, advice to property owners), demolition of buildings fallen
create a viable renovation out of use, additional services from the KredEx Foundation for
ecosystem. investments into residential buildings (renovation and construction of
rental buildings) and research and development activities to ensure
knowledgeable and efficient action.
The strategy considers the full programme, i.e. the renovation, by
Starting from the current 2050, of all buildings that have been built before 2000, although this
level, the renovation
might not be 100% possible in every building category. The total floor
volumes will grow fivefold by
2035.
area of the buildings needing renovation is 54 million square metres.
According to the strategy, the percentage of this total area to be
renovated by 2030 is 22%, by 2040, 64% and by 2050, 100%. In
practice, it can be assumed that around 20% of buildings in private
ownership will not fully reach the renovation depth target, i.e. class C,
the effect of which could be set off by renovating other buildings
better in the last decade of the strategy.
4
Table 1. Renovation volumes proposed by the strategy until 2050, by floor area.
Area to be renovated, m2
2021-2025 2026-2030 2031-2035 2036-2040 2041-2045 2046-2050 TOTAL
Private houses 400,000 950,000 1,900,000 3,100,000 3,900,000 3,800,000 14,000,000
Apartment buildings 2,280,000 3,200,000 4,000,000 3,900,000 3,000,000 1,800,000 18,000,000
Private-sector non-
840,000 1,800,000 3,200,000 4,200,000 4,100,000 2,900,000 17,000,000
residential buildings
Local government 680,000 1,400,000 1,300,000 480,000 70,000 0 4,000,000
buildings
Central-government 200,000 240,000 230,000 150,000 70,000 20,000 900,000
buildings
4,400,000 7,600,000 10,600,000 11,800,000 11,100,000 8,500,000 53,900,000
Keskvalitsuse hooned KOV hooned Üksikelamud Korterelamud Erasektori mitteeluhooned
2 500 000
AASTAS TERVIKLIKULT REKONSTRUEERITAV PINDALA, M 2
2 000 000
1 500 000
1 000 000
500 000
0
2 020 2 025 2 030 2 035 2 040 2 045 2 050
Figure 1. Cumulative annual renovation needs.
Keskvalitsuse hooned Central-government buildings
KOV hooned Local government buildings
Üksikelamud Private houses
Korterelamud Apartment buildings
Erasektori mitteeluhooned Private-sector non-residential buildings
Aastas terviklikult rekonstrueeritav pindala, m2 Fully renovated area per year, m2
The renovation of Considering the total annual renovation volumes of various building
apartment buildings and categories, the most active renovation years will need to see the full
public sector buildings is renovation of 2.3 M square metres a year, which is almost 5 times more
progressing rapidly, but than currently. It is mostly achievable by adjusting the shares of new
that of private houses and construction and renovation (see also 9.1 “Share of renovation in
commercial property is
construction sector”).
just beginning to gain
momentum. The renovation costs of the buildings were calculated in real terms on
the basis of the full renovation costs in 2019. As to public sector
buildings, it turned out to be necessary to divide the average full
5
The average renovation modernisation and conversion cost of €1100 per square metre into the
price is €400 per square cost of energy-saving renovation work (€600 per m2) and that of other
metre in current prices. work not related to improving energy performance. As the aim of the
strategy is to attain the climate goals, only the cost of the work to
achieve energy savings is taken into account. Regarding other building
categories, data on energy performance improvement work was
gathered during the preparation of this strategy: For example, in
apartment buildings, basically all work done improves energy
performance. As for private-sector non-residential buildings, the
strategy takes into account the renovation cost of the building
envelope and building services systems, which is €600 per square
metre because two-thirds of the buildings need that kind of renovation.
In the remaining one-third of the buildings, modernisation of the
building services systems is enough, and that would cost €200 per
square metre. Thus, the average renovation cost of private-sector non-
residential buildings is 0.33 × 200 + 0.67 × 600 = 450 €/m2.
So, the total cost of the full renovation of 54 million square metres, in
2019 prices, is around €22 billion, and the average full renovation cost
of the buildings is €400 per square metre. If the full-renovation cost of
public sector buildings is taken into account, the total cost would be
€24 billion.
Table 2. Costs of the renovations proposed by the strategy until 2050.
Renovation cost, €M
Cost, €/m2 2021-25 2026-30 2031-35 2036-40 2041-45 2046-50 TOTAL
Private houses 400 161 381 776 1,236 1,541 1,504 5,600
Apartment buildings 300 683 953 1,189 1,160 886 530 5,400
Private-sector non- 450 379 811 1,437 1,884 1,828 1,312 7,650
residential buildings
Local government 600 409 869 792 287 41 2 2,400
buildings
Central-government 600 119 142 136 90 41 13 540
buildings
1,749 3,156 4,330 4,657 4,337 3,361 21,590
Annual renovation The annual renovation financing needs also increase almost 5 times:
investments will reach from the current cost of under €200 M up to €900 M. To make building
€900 M. owners want to invest almost five times as much as now, the measures
proposed in the strategy will need to be applied.
6
1 000
900 927
REKONSTRUEERIMISE AASTANE MAKSUMUS, MLN €
915
800
808
754
700
600
572
500
400 431
300
200
187
100
0
2020 2025 2030 2035 2040 2045 2050
Figure 2. Annual financing needs for the full renovation of the buildings.
Rekonstrueerimise aastane maksumus, mln € Annual cost of renovation, €M
The possible government aid will take into account the financial
support for current measures and the renovation costs in 2019. The
strategy proposes a new measure for private-sector non-residential
buildings as there have been no renovation measures for these so far.
The more specific aid projection for the country covers the period until
2030. It is practicable to specify the need for financial support in the
upcoming periods later because during the step-by-step
implementation of the strategy, the financing logic, market capacity
and needs will change and savings due to development and innovation
might occur.
Table 3. Support needs until 2030.
Renovation support, €M
Support, % 2021-2025 2026-2030
Private houses 30 48 114
Apartment buildings 40 273 381
Private-sector non- 40 152 324
residential buildings
Local government buildings 50 204 435
Central-government 100* 119 142
buildings
796 1,396
* This is not the usual financial support as the central government is the owner of the
buildings.
If the financial support
amounts to €370 M a year, The financial support needed to launch investments in full renovation
almost €300 M will be will grow from the current almost €90 M a year to the maximum of
returned to the state €370 M in 2035. As the average tax revenue from renovation is 32%,
budget as taxes each year. almost €300 million a year will be returned to the state budget as taxes
7
if the annual total investment in renovations is around €930 M. On the
basis of this strategy, it is possible to prepare funding decisions when
drawing up the state budget.
400
373
350
354
329
300
295
TOETUS AASTAS, MLN €
250
200
195 202
150
100
87
50
0
2020 2025 2030 2035 2040 2045 2050
Figure 3. Annual financial support for the full renovation of the buildings.
Toetus aastas, mln € Annual support, €M
Besides financial support, the strategy proposes the creation of
Balanced regional additional services by the KredEx Foundation. These should also
development is possible significantly increase the investments in housing by involving private
with the help of an €8.4- partners as financiers, thus reducing the load on the state budget. This
billion fund that includes will speed up renovation of apartment buildings, increase the rental
10% of state resources. housing stock and use a counter-cyclical measure to even out the
fluctuations in construction volumes. According to one possible
scenario, for all the needs pointed out in this strategy to be covered,
the following estimated prerequisites should be met:
The annual financing needs will be around €220 M in the
beginning years, while the state contribution would
presumably be 10%, i.e. the state should cover one-tenth of
the amount.
The total financing need by 2050 will be €8.4 billion.
The state will get back around 30% of the construction costs
as taxes, i.e. the related tax revenue would be 70-170 M a
year.
Loans and guarantees are Some financial costs will be incurred when the national renovation loan
necessary for regions is launched and guarantees are provided for the renovation of private
where the property values houses:
are lower.
8
The loan measure would be meant for apartment associations
to whom commercial banks are not willing to lend as much as
needed for renovation. The capital needed to launch the loan
measure is around €5 M a year.
To renovate private houses in regions where property values
are lower, it must be possible to use state guarantees. These
would allow banks to issue loans independent of the value of
the collateral. The capital needed to launch the guarantee
measure is around €1 M a year.
During the implementation of the strategy, financial support needs to
be given to demolition of buildings that have fallen out of use. It was
projected that, by 2050, up to 10 M square metres of apartment
Investments in R&D result buildings and non-residential buildings will fall out of use. As the
in savings on renovation
demolition cost of one square metre is €50, the financing needs for
costs.
demolition work might be up to €15 M a year.
The R&D financing needs are estimated to be 1% of the state
contribution. This should ensure the activities are knowledge-based
Energy savings of 7 TWh/y and there will be savings on renovation costs in the long term. The
means the final energy
annual financing needs of the R&D&I activities are up to €4 M.
consumption will shrink
60%.
A final energy consumption reduction of around 7 TWh/y would be
possible if the buildings were fully renovated. It would be possible to
lower the heating consumption by up to 70% (~6.4 TWh/y) and
electricity consumption by up to 20% (~0.5 TWh/y). The modest
reduction in electricity consumption is due to the buildings where there
is no compliant interior climate, but it can be achieved by the
installation of the appropriate building services systems that use
4 M tonnes less CO2 electricity. The renewable electricity support measure helping to
emissions a year means
increase the electricity savings when necessary is not taken into
90% less GHG emissions.
account here.
Considering the renovation volumes proposed in the strategy and the
reduction of the specific emissions of CO2 from the electricity and
The implementation of the district heating, as estimated in the analysis of opportunities to raise
strategy requires speedy Estonia’s climate ambitions, the CO2 emissions reduction potential of
action; otherwise, the the existing buildings is around 90% (~4 M t CO2/y).
targets set for the first
decade will not be met.
To sum up, the strategy presents the long-term vision for the
renovation of buildings and describes the activities and volumes
necessary for attaining the goal. On the basis of the strategy, it would
be possible to start looking for the financing sources needed for
implementing it and to plan detailed support measures. The
projections in this strategy are needs-based and do not reflect the
current volume of funds for this purpose. The prerequisites for
implementing the activities foreseen in this strategy are their inclusion
in the national strategic planning and budgeting processes and optimal
use of the funds earmarked for this purpose. Due to the limited public-
9
sector resources, financing has to be found from various EU funds
(funds planned in Estonia and central funds), revenues from trading
GHG emission allowances, other state budget resources and private
funds through market-based services.
10
2 Contents
1 Summary ......................................................................................................................................... 2
3 Introduction .................................................................................................................................. 13
4 Overview of final energy consumption ....................................................................................... 15
4.1 Energy consumption in buildings ......................................................................................... 16
5 Overview of building stock .......................................................................................................... 18
5.1 Residential buildings ............................................................................................................ 18
5.2 Number and location of private houses .............................................................................. 20
5.3 Number and location of apartment buildings ..................................................................... 21
5.4 Residential buildings, by location in functional regions ..................................................... 23
5.5 Residential buildings emptying and falling out of use ........................................................ 26
5.6 Non-residential buildings ..................................................................................................... 28
5.7 Public sector ......................................................................................................................... 30
5.8 Private sector........................................................................................................................ 36
5.9 Non-residential buildings falling out of use ........................................................................ 37
5.10 Architectural monuments and buildings of cultural and environmental value ................. 37
6 Renovation practices so far.......................................................................................................... 38
6.1 Renovation of private houses .............................................................................................. 38
6.2 Renovation of private houses with the help of financial aid .............................................. 40
6.3 Renovation of apartment buildings ..................................................................................... 41
6.4 Renovation of apartment buildings with the help of support ............................................ 44
6.5 Renovation of non-residential buildings ............................................................................. 47
6.6 Renovation cost .................................................................................................................... 49
6.7 Energy savings achieved by renovation............................................................................... 53
6.8 Conclusions on renovation activity to date ......................................................................... 55
7 Volumes until 2050....................................................................................................................... 58
7.1 Renovation need .................................................................................................................. 58
7.2 Financing needs .................................................................................................................... 60
8 New buildings ............................................................................................................................... 64
8.1 Volume of new residential building construction ............................................................... 64
9 Impact of renovation.................................................................................................................... 67
9.1 Share of renovation in construction sector ......................................................................... 67
9.2 Impact of building renovation ............................................................................................. 68
10 Measures .................................................................................................................................. 72
10.1 Adoption of new technological solutions ............................................................................ 72
10.2 Research and development ................................................................................................. 73
10.3 Awareness raising................................................................................................................. 75
10.4 Demolition of buildings falling out of use ........................................................................... 76
10.5 Financing measures .............................................................................................................. 77
10.6 Creating additional services for residential building investments ..................................... 79
11 Annexes .................................................................................................................................... 81
11.1 CO2 emission reduction-based support measure for renovating commercial properties . 81
11.2 Measures related to renovation of existing buildings ........................................................ 83
11.3 Results of interviews conducted among owners of private sector non-residential
buildings ........................................................................................................................................... 84
11.4 Public consultation and inclusion of stakeholders in the preparation of the strategy ..... 86
11.5 Methodology for estimating residential building volumes. ............................................... 87
11
12
3 Introduction
The energy and climate policy objectives of Estonia are stipulated in the
National Development Plan of the Energy Sector until 2030
(NDPES 2030), the General Principles of Climate Policy until 2050
(GPCP 2050), the Climate Change Adaptation Development Plan until
2030 and Estonia’s 2030 National Energy and Climate Plan (NECP 2030).
To improve the energy performance of the existing building stock,
NDPES 2030 set targets for housing renovation and the demolition of
apartment buildings fallen out of use. The targets were proposed to be
achieved by the more active renovation of residential and non-
residential buildings, encouraged by support and loan measures.
Table 4. Targets set in NDPES 2030.
Net area, m2 Quantity
Residential buildings renovated with the
help of financial support
Apartment buildings 17 million
Private houses 10 million
Apartments and private houses with
improved energy use 320,000
Renovated buildings in the total building
stock
Apartment buildings (class C) 50%
Private houses (class C or D) 40%
Demolition of apartment buildings fallen
out of use 250
According to NECP 2030, the objective of Estonia for 2030 is to keep the
final energy consumption at the current 32-33 TWh/y and to reduce the
primary energy consumption up to 14%, both with the help of the
proposed energy savings measure. To attain this objective, the following
measures for the existing building stock have been proposed:
the renovation of public-sector and commercial buildings (HF1);
the renovation of private houses and apartment buildings (HF2);
the additional renovation of public-sector and commercial
buildings (HF5);
the additional renovation of private houses and apartment
buildings (HF6).
The main aim of this long-term strategy for housing renovation is a cost-
effective renovation of the existing building stock into nearly zero energy
buildings by 2050. In Estonian laws and regulations on the energy
performance of buildings, the cost-optimal energy performance level for
a major renovation is energy class C.3
The objective is laid down in the renewed Energy Performance of
Buildings Directive4, according to which the CO2 emissions of the building
stock must be reduced by 2050. To achieve the energy performance
targets, the average annual renovation rate has to be 3%; this would
make the energy use of the building stock start to diminish. Whereas, it
is important that the energy performance measures to be applied not
focus only on building envelopes but also cover building services systems
and ensure a healthy interior climate. Long-term renovation strategies
focus on financial mechanisms and stimuli for removing market failures
13
and on involving financial institutions so that the private sector could
make large investments in building renovation to improve their energy
performance. The strategy includes measures such as facilitation of
lending for improving the energy performance of buildings, facilitation
of public sector investments in the building stock of high energy
performance, public-private partnerships, reduction of possible
investment risks, financial support and creation of a revenue base
needed for financing the measures.
The strategy has an extremely large social dimension as it is estimated
that it would improve the living and working conditions of 80% of our
population. The renovation of homes and workspaces as well as tearing
down all derelict buildings will make the building stock safer, of better
aesthetic quality, better for health, better accessible and more
affordable.
This building renovation strategy is also linked to the EU Circular
Economy Action Plan5, one focus of which is construction, buildings and
preparation of a holistic and sustainable strategy for the built
environment, to promote circularity principles for buildings. In the
future, buildings should be renovated in view of the circular economy
principles (i.e. construction materials containing recycled material,
building passports and green public procurements).
To attain this objective, it is necessary to establish, in addition to the final
goal, the expected results and milestones of the renovation strategy for
2030, 2040 and 2050.
This project involved Jüri Rass, Ivo Jaanisoo, Ivan Sergejev and Regina
Valt from the construction and housing department of the Estonian
Ministry of Economic Affairs and Communications as clients. The
steering committee for preparing the strategy included Triin Reinsalu
from the KredEx Foundation (SA Kredex), Raul Prank from the State Real
Estate Company (Riigi Kinnisvara AS), Veronika Ilsjan, Eve Murumaa,
Lauri Lelumees, Mari Lahtmets and Tarmo Kivi from the Ministry of
Finance, and Hanna Jemmer and Irje Möldre from the energy
department of the Ministry of Economic Affairs and Communications.
The report on the strategy was drawn up by the nearly zero energy
building research team of the Civil Engineering and Architecture
Department, Tallinn University of Technology (TalTech): Jarek Kurnitski,
Kalle Kuusk, Helena Kuivjõgi, Lauri Lihtmaa, Aivar Uutar, Ergo Pikas,
Targo Kalamees, Raimo Simson.
3
Tallinn University of Technology. Analysis of cost-optimal minimum energy efficiency requirements for
buildings. 2017
4
Directive (EU) of the European Parliament and of the Council,, https://eur-lex.europa.eu/legal-
content/EN/TXT/HTML/?uri=CELEX:32018L0844&from=EN.
5
A new Circular Economy Action Plan. https://ec.europa.eu/environment/circular-economy/index_en.htm.
14
4 Overview of It has stayed between 31 TWh and 35 TWh for the recent 15 years.6
final energy Final consumption is more affected by business cycles than by the
outdoor climate. The consumption was the biggest, 35.8 TWh, in 2007,
consumption at the peak of the business cycle. Along with the downturn, the final
consumption fell 12% in two years, reaching 31.4 TWh in 2009. The
In 2018, the final energy winters of 2010 and 2012 were colder than average, and the energy
consumption was 35 TWh consumption rose a bit then. The winter of 2015, which was warmer
in Estonia. than average, did not affect final energy consumption. Since 2016, the
final energy consumption has been rising and reached 35 TWh again in
2018. The years 2016, 2017 and 2018 have seen quite similar outdoor
climate conditions.
Lõpptarbimine, TWh
40
35 35,8
34,7 35,3
34,0 33,2 33,8
32,5 33,0 32,6
31,6 31,9 31,9 32,3 32,0
30 31,4
25
20
15
10
5
0
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
Figure 4. Final Energy Consumption.
Lõpptarbimine, TWh Final consumption, TWh
Energy consumption by household accounts for the biggest part of the final
energy consumption: 40%. Transport and industry each account for 21%.
Commercial and public service sectors account for 15% of the final
consumption.
Table 5. Final Energy Consumption 2018, TWh.
District
Fuels heating Electricity Total Percentage
Industry 2.60 2.06 2.65 7.3 21%
Agriculture and Fisheries 0.83 0.07 0.17 1.1 3%
Transport 7.23 0.04 0.09 7.4 21%
Commercial and public
services 0.64 2.20 2.53 5.4 15%
Households 8.48 3.75 1.86 14.1 40%
Final consumption 19.8 8.1 7.3 35.2
6
Statistics Estonia. KE024: ENERGY BALANCE SHEET BY TYPE OF FUEL OR ENERGY
15
Fuel consumption accounts for the biggest part of the consumption,
compared to district heating and electricity. Fuels include, for example,
woodfuels, gas, fuel oil, diesel fuel and petrol.
Energy consumption 4.1 Energy consumption in buildings
of residential buildings
The data of Statistics Estonia regarding the commercial and public services
is ~11 TWh and that of
sector also include the consumption of diesel fuel and petrol not directly
non-residential
buildings, ~6 TWh. related to the energy consumption of buildings. Energy consumption of
residential and non-residential buildings can be estimated after the final
consumption of diesel fuel and petrol is moved from under households and
commercial and public services sectors to the transport sector.
Table 6. Final Energy Consumption 2018, TWh.
Fuels District Electricity Total Percentage
heating
Industry 2.60 2.06 2.65 7.3 21%
Agriculture and Fisheries 0.83 0.07 0.17 1.1 3%
Transport 10.63 0.04 0.09 10.8 30%
Non-residential buildings 0.45 2.20 2.53 5.2 15%
Residential buildings 5.28 3.75 1.86 10.9 31%
Final consumption 19.8 8.1 7.3 35.2
The annual energy consumption of residential buildings has been relatively
stable, between 10 and 12 TWh. Around 85% of the consumption is heating
(~9 TWh) and ~15%, electricity (~2 TWh). Over the years, the share of
electricity consumption has increased in the energy consumption of
residential buildings.
The final energy consumption of non-residential buildings as increased as
well. In 2004, non-residential buildings consumed 4 TWh of energy. By 2017,
their consumption had increased 50%, reaching 6 TWh. Around 50% of the
consumption of non-residential buildings is heat consumption (~3 TWh) and
the other 50%, electricity (~3 TWh).
The energy consumption of buildings is significantly affected by outdoor
climate. The winters of 2010 and 2012, which were colder than average,
caused the consumption to increase. The winter of 2015, which was warmer
than average, reduced the energy consumption by buildings.
16
Eluhooned Mitteeluhooned
14
11,9
12 11,3
11,2 11,1 11,3
10,8 10,9 10,9 10,8 10,9 10,9
10,3 10,2 10,3
10,0
10
8
6 5,6 5,8
5,1 5,2
4,8 4,6 4,9
4,5 4,6 4,5 4,3 4,5
3,9 4,0 4,1
4
2
0
2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
Figure 5. Final energy consumption in buildings.
Eluhooned Residential buildings
Mitteeluhooned Non-residential buildings
17
5 Overview of 5.1 Residential buildings
building stock Most of the Estonian residential buildings are in private ownership.
According to the population and housing census of 20117, 97% of
dwellings were in private ownership. State or local authorities owned
just 2% of dwellings.
Residential buildings are
mostly privately owned. Välisriigi elanik Muu omanik
1% 1%
Riik või kohalik
omavalitsus
2%
Eesti elanik
96%
Figure 6. Residential buildings, by owner.
The renovation strategy covers buildings constructed before 2000
(included). Buildings constructed later have higher energy
performance. According to the survey of apartment buildings taken
into use in the period from 1990 to 2010, their average space heating
energy consumption was 102 kWh/m2/y.8 According to the survey of
apartment buildings made of bricks, their average space heating energy
consumption was 150 kWh/m2/y.9 The thermal conductivity of the
building envelope of houses constructed after 2000 is significantly
lower than that of those constructed before 1990. In general, the
former do not need a full renovation that includes adding insulation to
the envelope. The renovation would mostly cover modernisation of
building services systems and addition of local renewable energy
production. The strategy focuses on buildings that were erected before
2000 and need a full renovation. These account for the biggest part of
the building stock.
According to the population and housing census of 2011, 93%
apartments and 89% of private houses of known construction date
have been taken into use before 2000.
Välisriigi elanik Foreign resident
Riik või kohalik omavalitsus State or local government
Muu omanik Other owner
7
Statistics Estonia. RL0206. Occupied conventional dwellings by type of building, owner and location.
18
Eesti elanik Estonian resident
Korterid korterelamutes Väikeelamud
140 000
120 000
100 000
ELURUUMIDE ARV
80 000
60 000
40 000
20 000
0
Enne 1919 1919–1945 1946–1960 1961–1970 1971–1980 1981–1990 1991–2000 2001–2005 2006 või
hiljem
Figure 7. Dwellings, by year of taking into use.
Korterid korterelamutes Apartments in apartment buildings
Väikeelamud Small residential buildings
Eluruumide arv Number of dwellings
Enne 1919 Before 1919
2006 või hiljem 2006 or later
According to the Building Registry, the number of energy performance
certificates issued on the basis of consumption data for residential
buildings taken into use before 2000 (included) amounts to 3 200. On
the scale of energy performance, class A refers to nearly zero energy
buildings and class C, energy performance after a major renovation.
Class A, B or C has been awarded to only 22% of small residential
buildings and 9% of apartment buildings with an energy performance
certificate.
8
Tallinn University of Technology. Eesti eluasemefondi ehitustehniline seisukord – ajavahemikul 1990–2010
kasutusele võetud korterelamud [State of repairs of Estonian housing stock: apartment buildings constructed
between 1990 and 2010]. 2012
9
Tallinn University of Technology. Eesti eluasemefondi telliskorterelamute ehitustehniline seisukord ning
prognoositav eluiga [State of repairs and estimated life span of brick apartment buildings in Estonian housing
stock] 2010.
19
Väikeelamud Korterelamud
800
706
700
600
527
500
HOONETE ARV
400
300
231 243 232 218
196 205
200 185
135
109
79 92
100
36
7
0
A B C D E F G H
Figure 8. Energy performance certificates of residential buildings taken into use before 2000.
Väikeelamud Small residential buildings
Korterelamud Apartment buildings
Hoonete arv Number of buildings
5.2 Number and location of private houses
According to the Building Registry, the number of private houses of
The number of private known area taken into use before 2000 (included) is 155,150, their total
houses taken into use floor area amounting to 19,998,000 square metres. The percentage of
before 2000 and still in use private houses is rather similar in all counties. The number and floor
is 155,000, and their total area of private houses exceed 10% in three counties: Harju, Tartu and
floor area amounts to Pärnu Counties.
20 million square metres.
Table 7. Private houses, by counties.
Number of private Net floor area, m2
houses
Harju County 28,130 18% 4,003,000 20%
Hiiu County 3,250 2% 347,000 2%
Ida-Viru County 8,270 5% 876,000 4%
Jõgeva County 7,930 5% 1,042,000 5%
Järva County 7,200 5% 952,000 5%
Lääne County 4,090 3% 487,000 2%
Lääne-Viru County 13,400 9% 1,602,000 8%
Põlva County 6,480 4% 743,000 4%
Pärnu County 15,280 10% 2,024,000 10%
Rapla County 8,100 5% 1,177,000 6%
Saare County 8,350 5% 960,000 5%
Tartu County 17,290 11% 2,512,000 13%
Valga County 6,650 4% 710,000 4%
Viljandi County 11,170 7% 1,564,000 8%
Võru County 9,600 6% 1,001,000 5%
Total 155,150 19,998,000
20
Figure 9. Private houses constructed before 2000 still in use (data based on the administrative divisions of 2019).
Hiiumaa Hiiu County
Saaremaa Saare County
Läänemaa Lääne County
Harjumaa Harju County
Lääne-Virumaa Lääne-Viru County
Ida-Virumaa Ida-Viru County
Raplamaa Rapla County
Järvamaa Järva County
Jõgevamaa Jõgeva County
Pärnumaa Pärnu County
Viljandimaa Viljandi County
Tartumaa Tartu County
Valgamaa Valga County
Põlvamaa Põlva County
Võrumaa Võru County
5.3 Number and location of apartment buildings
The number of apartment According to the Building Registry, the number of apartment buildings
buildings taken into use of known floor area taken into use before 2000 (included) is 22,600,
before 2000 still in use is their total area amounting to 28,378,000 square metres. The three
22,000, their total floor counties with the biggest area of apartment buildings (Harju, Ida-Viru
area amounting to and Tartu Counties) account for 71% of their total floor area. Around
28 million square metres. one-third of apartment buildings and almost half of their floor area are
in Harju County.
46% of their total floor
area is in Harju County.
21
Table 8. Apartment buildings, by county.
Number of Net floor area, m2
apartment buildings
Harju County 8,060 36% 12,956,000 46%
Hiiu County 160 1% 114,000 0.4%
Ida-Viru County 2,140 9% 4,230,000 15%
Jõgeva County 690 3% 559,000 2%
Järva County 760 3% 715,000 3%
Lääne County 520 2% 489,000 2%
Lääne-Viru County 1,490 7% 1,361,000 5%
Põlva County 460 2% 428,000 2%
Pärnu County 2,110 9% 1,605,000 6%
Rapla County 650 3% 564,000 2%
Saare County 540 2% 454,000 2%
Tartu County 2,480 11% 2,803,000 10%
Valga County 600 3% 582,000 2%
Viljandi County 1,270 6% 881,000 3%
Võru County 690 3% 638,000 2%
Total 22,600 28,378,000
Figure 10. Apartment buildings constructed before 2000 still in use (data based on the administrative divisions of 2019).
Hiiumaa Hiiu County
Saaremaa Saare County
Läänemaa Lääne County
Harjumaa Harju County
Lääne-Virumaa Lääne-Viru County
Ida-Virumaa Ida-Viru County
Raplamaa Rapla County
Järvamaa Järva County
Jõgevamaa Jõgeva County
22
Pärnumaa Pärnu County
Viljandimaa Viljandi County
Tartumaa Tartu County
Valgamaa Valga County
Põlvamaa Põlva County
Võrumaa Võru County
5.4 Residential buildings, by location in functional regions
Based on their floor area, As for residential buildings, besides administrative divisions, functional
81% of the apartment regions10 need to be considered. The subdivisions of functional regions
buildings are in county largely coincide with the property value regions11, and these
and second-tier centres. subdivisions also reflect people’s ability to renovate their housing on
market terms and conditions. The property value of apartments is an
indicator of the economic capacity of the area. In areas further away
from centres, renovation is more difficult because there are more
residential buildings emptying in peripheries, smaller organisational
capacity, smaller contributions to the renovation fund, etc. Renovation
analyses regarding apartment buildings have indicated a correlation
between renovation activity and property prices.
As for small residential buildings, area-wise, these are distributed
evenly throughout the subdivisions. Apartment buildings, however,
have concentrated into centres of functional regions and second-tier
centres: 81% of their floor area is there.
Table 9. Residential buildings, by location in functional regions.
Number of private Net floor area, m2
houses
Centre of functional 34,500 22% 4,856,000 24%
region
Second-tier centre 15,900 10% 2,065,000 10%
Immediate hinterland 40,400 26% 5,332,000 27%
Transitional area 32,700 21% 3,953,000 20%
Periphery 31,600 20% 3,792,000 19%
TOTAL 155,100 19,998,000
Number of Net floor area, m2
apartment buildings
Centre of functional 13,200 58% 20,133,000 71%
region
Second-tier centre 2,400 11% 2,822,000 10%
Immediate hinterland 3,000 13% 2,312,000 8%
Transitional area 2,100 10% 1,699,000 6%
Periphery 1,900 8% 1,411,000 5%
TOTAL 22,600 28,378,000
10
Toimepiirkondade määramine [Identification of Functional Regions]. Ministry of the Interior, Statistics
Estonia. 2014
11
Korterelamute renoveerimistoetuste meetme arendus [Development of apartment building renovation
measure]. MTÜ Tartu Regiooni Energiaagentuur [Tartu Regional Energy Agency, NGO]. 2018
https://www.mkm.ee/sites/default/files/trea_renoveerimismeetmete_uuring_lopparuanne.pdf.
23
Figure 11. Functional region subdivisions and centres.
Kuressaare linn Kuressaare city
Haapsalu linn Haapsalu city
Rapla linn Rapla city
Paide linn Paide city
Rakvere linn Rakvere city
Ahtme linnaosa Ahtme district
Jõhvi linn Jõhvi city
Narva linn Narva city
Sillamäe linn Sillamäe city
Jõgeva linn Jõgeva city
Pärnu linn Pärnu city
Viljandi linn Viljandi city
Tartu linn Tartu city
Põlva linn Põlva city
Valga linn Valga city
Võru linn Võru city
Orissaare alevik Orissaare small town
Haabneeme alevik Haabneeme small town
Tabasalu alevik Tabasalu small town
Maardu linn Maardu city
Keila linn Keila city
Loo alevik Loo small town
Saue linn Saue city
Saku alevik Saku small town
Riisipere alevik Riisipere small town
Kohila alev Kohila town
Orgita küla Orgita village
24
Loksa linn Loksa city
Kuusalu alevik Kuusalu small town
Kehra linn Kehra city
Kose alevik Kose small town
Kunda linn Kunda city
Kadrina alevik Kadrina small town
Tapa linn Tapa city
Tamsalu linn Tamsalu city
Väike-Maarja alevik Väike-Maarja small town
Kiviõli linn Kiviõli city
Narva-Jõesuu linn Narva-Jõesuu city
Mustvee linn Mustvee city
Alatskivi alevik Alatskivi small town
Järvakandi alev Järvakandi town
Lihula linn Lihula city
Türi linn Türi city
Põltsamaa linn Põltsamaa city
Suure-Jaani linn Suure-Jaani city
Elva linn Elva city
Räpina linn Räpina city
Otepää linn Otepää city
Antsla linn Antsla city
Tõstamaa alevik Tõstamaa small town
Häädemeeste alevik Häädemeeste small town
Kilingi-Nõmme linn Kilingi-Nõmme city
Abja-Paluoja linn Abja-Paluoja city
Karksi-Nuia linn Karksi-Nuia city
Tõrva linn Tõrva city
Toimepiirkondade keskus Centre of functional regions
Piirkondlik keskus Second-tier centre
Toimepiirkonna vööndid: Functional region subdivisions
Lähivöönd Immediate hinterland
Siirdevöönd Transitional area
Ääreline ala Periphery
Lauri Lihtmaa Nov 2019 Lauri Lihtmaa Nov 2019
Andmete allikad: Maa-amet, Statistikaamet, SA Data sources: Land Board, Statistics Estonia, SA
KredEx, Ehitisregister KredEX, Building Registry
25
Figure 12. Apartment value regions.
5.5 Residential buildings emptying and falling out of use
Internal migration and Residential buildings getting empty and falling out of use is directly
urbanisation are the main linked to demographic changes. According to the population
causes of residential projection12 of Statistics Estonia, the population of Estonia will shrink
buildings falling out of use. 2.7% by 2045. The age distribution of the population will also change.
By 2060, the share of people aged 65+ will grow from the current 20%
to 30%.
Changes in counties vary. According to the projection, the population
of Ida-Viru, Järva, Valga and Jõgeva counties will diminish by one-third.
The population of Harju County will grow. Smaller increases in the
population are expected for Tartu County as well.
In addition, there will be changes within the counties. Settlements
outside centres will gradually become empty due to urbanisation and
regional immigration.
12
Statistikaameti rahvastikuprognoos aastani 2080 [Statistics Estonia’s population projection up to 2080].
https://www.stat.ee/news-release-2019-077.
26
30%
20%
10%
0%
Valga
Hiiu
Rapla
Võru
Harju
Pärnu
Jõgeva
Lääne
Saare
Tartu
Järva
Põlva
Ida-Viru
Viljandi
Lääne-Viru
-10%
-20%
-30%
-40%
Figure 13. Projection of population changes in counties by 2045.
Empty apartment buildings create bigger problems than private
houses. Apartment buildings are getting empty step by step until the
remaining residents are no longer able to keep the building in a good
state of repair or renovate it as needed. Emptying apartment buildings
are a problem for local authorities and the central government as well.
To solve the problem of emptying apartment buildings, a pilot project13
has been launched in three municipalities to find solutions to the
problem of empty and half-empty apartment buildings, both for the
municipalities and the locals. The project looks for solutions such as
how to move people to sustainable apartment buildings and to tear
down the empty apartment buildings that are partially in private
ownership.
Up to 25% of private According to the projections, around 40,000 private houses (~4.8 M m2)
houses (~40,000) and up and 5,300 apartment buildings (~5 M m2) might fall out of use by 2050.
to 23% apartment Changes in population numbers affect the peripheries of functional
buildings (~5,300) might
regions the most, as these are projected to be the first to become
fall out of use.
empty. While in centres, less than 10% of residential buildings is
expected to fall out of use, this indicator might be as high as 80% in the
peripheries of functional regions.
As for empty private houses, it is likely that not all of them will be
vacant. Instead, they will be seasonally used as a summer or country
house.
Table 10. Residential buildings falling out of use in functional region subdivisions.
Number of private Net floor area, m2
houses
Centre of functional 1,500 4% 160,000 3%
region
13
https://www.rahandusministeerium.ee/et/eesmargidtegevused/riigivara/tuhjenevate-korterelamute-
projekt.
27
Second-tier centre 700 5% 83,000 4%
Immediate hinterland 2000 5% 200,000 4%
Transitional area 11,000 34% 1,300,000 33%
Periphery 25,000 80% 3,000,000 80%
TOTAL 40,000 25% 4,800,000 24%
Number of Net floor area, m2
apartment buildings
Centre of functional 500 4% 1,100,000 6%
region
Second-tier centre 300 12% 300,000 11%
Immediate hinterland 1,000 34% 700,000 30%
Transitional area 1,700 80% 1,400,000 80%
Periphery 1,800 95% 1,400,000 95%
TOTAL 5,300 23% 4,900,000 18%
5.6 Non-residential buildings
The Building Registry includes 375,000 non-residential buildings that
are in use and have been taken into use before 2000 (included). Their
There are 32,000 non-
total floor area amounts to 62 M square metres. There are non-
residential buildings with
residential buildings with climate control (office, educational and
climate control, their total
floor area being 28 M commercial buildings, etc.) and without (ancillary buildings of
square metres. residential buildings, agricultural buildings, pumping stations, etc.). The
strategy focuses on non-residential buildings with climate control.
There are around 32,000 such buildings with the total floor area of
28 M square metres.
Table 11. Non-residential buildings with climate control.
Quantity of buildings Net area, m2
OFFICE 4,010 13% 4,300,000 15%
ACCOMMODATION 2,340 7% 1,020,000 4%
COMMERCE AND
SERVICES 6,710 21% 4,170,000 15%
EDUCATION, RESEARCH 1,990 6% 3,890,000 14%
HEALTHCARE 550 2% 1,050,000 4%
WAREHOUSES 7,590 24% 4,100,000 15%
INDUSTRY 7,920 25% 9,180,000 33%
SPECIAL-PURPOSE
BUILDINGS 740 2% 420,000 1%
31,850 28,130,000
28
The non-residential buildings are mainly in centres. Based on their floor
area, 70% of non-residential buildings are in the centres of functional
regions or in second-tier centres. Area-wise, 6% of non-residential
buildings are in the peripheries of functional regions.
Table 12. Non-residential buildings, by location in functional regions.
Number of non- Net floor area, m2
residential buildings
Centre of functional
region 13,200 42% 16,790,000 60%
Second-tier centre 3,700 12% 3,010,000 11%
Immediate hinterland 6,220 20% 3,830,000 14%
Transitional area 4,570 14% 2,580,000 9%
Periphery 3,970 13% 1,760,000 6%
TOTAL 31,800 28,000,000
Energy performance certificates issued on the basis of consumption
data have been issued to 1700 non-residential buildings, i.e. 5% of all
non-residential buildings with climate control. The biggest number of
these certificates has been issued to office buildings (440), followed by
nursery schools (390) and other schools (355). 27% of energy
performance certificates issued to non-residential buildings are of class
A, B or C. The biggest number of such certificates are of class D.
To ensure the energy performance of non-residential buildings, the
State Real Estate Company Riigi Kinnisvara AS has drawn up guidance
on the energy performance of non-residential buildings14 and guidance
for chief design engineers on ensuring energy performance of non-
residential buildings15.
14
Riigi Kinnisvara AS. Madal- ja liginullenergiahooned [Low and nearly zero energy buildings].
https://rkas.ee/sites/default/files/public-uploaded-files/Uuringud/Madal_ja_liginullenergiahooned.PDF.
15
Riigi Kinnisvara AS. Energiatõhususe juhendmaterjal ja metoodika peaprojekteerijatele ning arhitektidele
[Energy performance guidance material and methodology for chief design engineers and architects].
https://rkas.ee/sites/default/files/public-uploaded-files/juhendid/Juhendmaterjal%202017%2010.pdf.
29
Büroo Kaubandus ja teenindus Koolid Lasteaiad Muud hooned
140 133
120
120
110
99 100
100
86
83
HOONETE ARV
80 7576
72
65 65
60
50 50
44 45
42 41 40
40 37 37
26 26 27 27
22
20 1919 21 18
20 14 15
11 9
8
4 4
1
0
A B C D E F G H
Figure 14. Energy performance certificates of non-residential buildings taken into use before 2000.
Büroo Office
Kaubandus ja teenindus Commerce and services
Koolid Schools
Lasteaiad Nursery schools
Muud hooned Other buildings
Hoonete arv Number of buildings
5.7 Public sector
The data on the buildings of the central government is based on the data in
the State Real Estate Registry.16 Such buildings also include residential
buildings owned by the central government. The percentage of government-
owned residential buildings is small, and a large part of these are apartment
buildings that have to be demolished in Ida-Viru County. The Real Estate
Registry data do not contain information on buildings used by state
foundations (~660,000 m2) and buildings of bodies governed by public law
(~800,000 m2). There is no central database on all public sector buildings
yet.17
According to the State Real Estate Registry, the property is managed by
ministries, the Government Office, the Chancellery of the Riigikogu, the
Office of the President, the Office of the Chancellor of Justice, the Supreme
Court and the National Audit Office. Authorised users include subordinate
entities, such as schools, museums, the State Forest Management Centre,
the Rescue Board, etc. In 2018, the central government sector used a total of
2.3 million square metres of floor area, 1.4 million m2 of which was owned
by the central government and 860,000 m2 it rented.
The floor area of real
estate with climate control The strategy targets the buildings that are owned by the central government,
owned by the central in use, have climate control, are not under protection as heritage or culturally
16
State Real Estate Registry. https://riigivara.fin.ee/kvr/.
17
Ministry of Finance. Riigi kinnisvara valitsemise koondaruanne 2015-2018 [Summary report on state real
estate management 2015-2018].
30
government amounts to and environmentally valuable and are located in Estonia. The Ministry of
820,000 square metres. Foreign Affairs has real estate in other countries, but this is not addressed in
the present renovation strategy. The floor area of government-owned
buildings with climate control is 820,000 m2. The majority of it is that of
educational and research buildings, vocational schools accounting for the
biggest part thereof. Of accommodation buildings, the majority are
dormitories for students or pupils. Of commercial and service buildings, the
majority are museums and sports buildings. Special-purpose buildings
include internal security and defence forces buildings.
The majority of such
buildings are schools and TERVISHOID TÖÖSTUS
ELUHOONED LAOD
offices. 5% 2% 1% 1%
MUUD
ERIHOONED
7%
KAUBANDUS,
TEENINDUS
HARIDUS, TEADUS
8%
46%
MAJUTUS
14%
BÜROO
16%
A quarter of the floor area
of central-government Figure 15. Real estate owned by the central government, by floor area.
property has at least class
C energy performance.
Eluhooned Residential buildings
Laod Warehouses
Tervishoid Healthcare
Tööstus Industry
Muud erihooned Other special-purpose buildings
Kaubandus, teenindus Commerce, services
Majutus Accommodation
Büroo Office
Haridus, teadus Education, research
The State Real Estate Registry has energy performance certificate
information on 49% of the floor area of central-government-owned buildings
with climate control. Based on floor area, 25% of government-owned
property, i.e. 200,000 m2, with an energy performance certificate has been
awarded class A, B or C.
In addition to the energy performance certificate data on the property
owned by the central government, the State Real Estate Registry has
information on the energy performance certificates of premises rented by
31
the central government. Such information is known regarding 81% of rented
premises with climate control. Pursuant to the Energy Performance of
Buildings Directive (2012/27/EU)18, central governments should only buy or
rent premises in buildings that meet at least the minimum energy
performance requirements. Of the government-rented premises with
climate control, 30%, i.e. 230,000 m2, comply with energy class A, B or C. The
biggest percentage of class A premises the central government rents is in the
joint ministerial building at Suur-Ameerika 1, Tallinn.
Omand Renditud
140 000 133 000
129 000
126 000
120 000
98 000
REGISTRIVARA PINDALA, M2
100 000
91 000
80 000
68 000
59 000 58 000
60 000 53 000 51 000
45 000 45 000
40 000 34 000
20 000 17 000 15 000
11 000
0
A B C D E F G H
Figure 16. Premises that have an energy performance certificate and are used by the central government, by energy class.
Omand Owned
Renditud Rented
Registrivara pindala, m2 Area of registered property, m2
The State Real Estate Registry also has data on the state of repairs of
the buildings: 5 – good, 4 – satisfactory, 3 – needing repairs, 2 – to be
demolished. The accommodation and educational buildings have the
best state of repairs. As the majority of the accommodation buildings
are school dormitories, it can be inferred that so far, investments have
been made mostly for educational buildings.
Table 13. Premises with climate control owned by the central government.
OWNED PROPERTY IN IN GOOD STATE OF NEEDING RENOVATION
TOTAL REPAIRS AND OF AT LEAST
CLASS C
Quantity Area of Quantity Area of Quantity Area of
registered registered registered
property, property, property,
m2 m2 m2
RESIDENTIAL BUILDINGS 257 40,100 4 400 253 39,700
OFFICE 104 70,100 1 2,200 103 67,900
ACCOMMODATION 106 108,100 14 37,700 92 70,400
18
Directive 2012/27/EU of the European Parliament and of the Council. https://eur-lex.europa.eu/legal-
content/EN/TXT/HTML/?uri=CELEX:32012L0027&from=EN.
32
COMMERCE AND 64 29,900 7 7,700 57 22,200
SERVICES
EDUCATION, RESEARCH 109 318,600 21 115,500 88 203,100
HEALTHCARE 7 8,800 0 0 7 8,800
WAREHOUSES 102 19,200 0 0 102 19,200
INDUSTRY 14 6,100 0 0 14 6,100
OTHER SPECIAL-PURPOSE 99 63,300 0 0 99 63,300
BUILDINGS
862 660,000 47 160,000 815 500,000
In this renovation strategy, the property owned by the central
government also includes 570,000 m2 of premises with climate control
the government rents from the State Real Estate Company. The biggest
part of such rented premises are offices, special-purpose buildings
(buildings of the Rescue Board, prisons) and educational buildings
(upper secondary and vocational schools).
Table 14. Premises with climate control rented from State Real Estate Company.
RENTED FROM STATE IN GOOD STATE OF NEEDING RENOVATION
REAL ESTATE COMPANY REPAIRS AND OF AT LEAST
CLASS C
Quantity Area of Quantity Area of Quantity Area of
registered registered registered
property, property, property,
m2 m2 m2
RESIDENTIAL BUILDINGS 50 7,200 1 100 49 7,100
OFFICE 147 258,000 10 54,900 137 203,100
ACCOMMODATION 10 8,400 8 4,500 2 3,900
COMMERCE AND 13 66,800 6 20,100 7 46,700
SERVICES
EDUCATION, RESEARCH 31 66,600 8 26,300 23 40,300
HEALTHCARE 5 3,800 1 600 4 3,200
WAREHOUSES 0 0 0 0 0 0
INDUSTRY 3 1,400 0 0 3 1,400
OTHER SPECIAL-PURPOSE 110 158,700 19 57,800 91 100,900
BUILDINGS
369 570,000 53 160,000 316 410,000
There is no separate database on municipal real estate. The data on
The buildings with climate municipal buildings comes from a report19 issued by the National Audit Office
control owned by local in 2016. In 2015, municipalities used 6 300 buildings with the total floor area
authorities have of 5.6 million square metres. Among others, these include ~5 000 buildings
5.3 million m2 of floor with climate control and the total floor area of 5.3 million m2.
area.
The majority of the municipal buildings with climate control are schools and
nursery schools. Service buildings include libraries, local community centres,
museums and sports buildings. Accommodation includes social housing and
retirement homes.
19
Riigikontroll „Ülevaade omavalitsuste hoonestatud kinnisvarast ja selle haldamisest“ [National Audit Office.
Overview of municipal real estate and its management]. 2016.
33
The majority of such TERVISHOID MAJUTUS
buildings are schools and 5% 5%
nursery schools.
BÜROO
6%
MUUD HOONED
12%
HARIDUS, TEADUS
55%
KAUBANDUS,
TEENINDUS
17%
Figure 17. Distribution of real estate owned by municipalities, by floor area.
Tervishoid Healthcare
Majutus Accommodation
Büroo Office
Muud honed Other buildings
Kaubandus, teenindus Commerce, services
Haridus, teadus Education, research
Information on energy performance certificates is known about
1,600 municipal buildings, which account for 49% of the total floor area of
municipal buildings with climate control. Based on floor area, 17% of
municipal property, i.e. 900,000 m2, with an energy performance certificate
have been awarded class A, B or C.
34
800 000
724 000
693 000
700 000
600 000 576 000
500 000
NETOPIND, M2
400 000
300 000
202 000
200 000
149 000
107 000
100 000 87 000
71 000
0
A B C D E F G H
Figure 18. Municipal buildings with energy performance certificates, by energy class and floor area.
Netopind, m2 Net area, m2
For the National Audit Office’s report, municipalities assessed the state
of repairs of their buildings on a 5-point scale: very good, good,
satisfactory, poor, and very poor.
Around 4 million square
metres need renovation. Municipal buildings estimated to be in a very good or good state of
repairs and having at least energy class C are considered to not need
renovation. The buildings in the best state of repairs are healthcare,
educational and service buildings. Worse is the state of repairs of
buildings municipalities classified under other buildings, i.e. mostly
residential buildings, workshops and ancillary buildings.
10% of municipal buildings is estimated to fall out of use. Municipalities
estimated that 90% of premises currently in use will also be in use after
5 years.
Table 15. State of repairs of municipal buildings.
BUILDINGS IN USE IN GOOD STATE OF NEEDING RENOVATION
REPAIRS AND OF AT
LEAST CLASS C
Quantity Net area, m2 Quantity Net area, m2 Quantity Net area, m2
OFFICE 378 290,000 24 11,000 354 279,000
ACCOMMODATION 216 215,000 12 8,000 204 207,000
COMMERCE AND 1,130 825,000 112 113,000 1,018 712,000
SERVICES
EDUCATION, RESEARCH 1,352 2,589,000 158 376,000 1,194 2,212,000
HEALTHCARE 138 258,000 13 53,000 125 205,000
OTHER BUILDINGS 847 476,000 36 49,000 811 427,000
4,061 4,700,000 355 610,000 3,706 4,000,000
35
5.8 Private sector
In the analysis of this strategy, private-sector non-residential buildings
There are 22 million
include such buildings with climate control, taken into use before 2000
square metres of
(included) and not owned by the central government or municipality. The
private-sector non-
residential buildings. quantity of these buildings is 27,000, their total floor area being 22 million
square metres. The biggest part of private-sector non-residential buildings
are industrial buildings, warehouses, offices, commercial and services
buildings.
TERVISHOID; 3% MAJUTUS; 3% ERIHOONED;
1%
HARIDUS,
TEADUS; 4%
KAUBANDUS,
TEENINDUS; 15% TÖÖSTUS; 41%
BÜROO; 17%
LAOD; 18%
Figure 19. Private-sector non-residential buildings, by floor area.
Tervishoid Healthcare
Majutus Accommodation
Erihooned Special-purpose buildings
Haridus, teadus Education, research
Kaubandus, teenindus Commerce, service
Tööstus Industry
Büroo Office
Laod Warehouses
Table 16. Commercial property with climate control.
Quantity of buildings Net area, m2
OFFICE 3,400 13% 3,680,000 17%
ACCOMMODATION 2,000 7% 690,000 3%
COMMERCE AND 5,500 20% 3,250,000 15%
SERVICES
EDUCATION, RESEARCH 500 2% 920,000 4%
HEALTHCARE 400 1% 780,000 3%
WAREHOUSES 7,500 28% 4,080,000 18%
INDUSTRY 7,900 29% 9,170,000 41%
SPECIAL-PURPOSE 500 2% 200,000 1%
BUILDINGS
26,900 22,300,000
36
5.9 Non-residential buildings falling out of use
It is estimated that up to The percentage of non-residential buildings to fall out of use is
6 million m2 of non- estimated to be of the same magnitude as for apartment buildings. In
residential buildings might peripheries, up to 90% of non-residential buildings might fall out of use;
fall out of use. in transitional areas, this indicator might be 80%; in the immediate
hinterland, 30%, second-tier centres, 10%; and in functional region
centres, 5%. Quantity-wise, up to 30% and area-wise, up to 20% of non-
residential buildings are projected to fall out of use.
Table 17. Non-residential buildings estimated to fall out of use.
Quantity of Net floor area, m2
buildings
Centre of functional
region 700 800,000
Second-tier centre 400 300,000
Immediate hinterland 1,900 1,100,000
Transitional area 3,700 2,100,000
Periphery 3,600 1,600,000
10,300 5,900,000
5.10 Architectural monuments and buildings of cultural and
environmental value
Pursuant to the Building Code, the minimum energy performance
requirements do not apply to buildings that have been declared to be
architectural monuments, that are used primarily for religious purposes
and that are of cultural and environmental value. Nevertheless, the
number and floor area of buildings mentioned in this strategy partially
include architectural monuments and buildings of cultural and
environmental value. The scope of this strategy excludes buildings that,
according to the Building Registry, are defined as cult or sacramental
buildings and according to the State Real Estate Registry, as heritage or
buildings of the cultural and environmental value belonging to the
central government.
The number of architectural monuments is 527620, i.e. 2% of the total
number of buildings covered by this strategy (~210,000). There is no
central registry for buildings of the cultural and environmental value. A
built-up area of the cultural and environmental value is an area
20
National Heritage Board. National Registry of Cultural Monuments.
https://register.muinas.ee/public.php?menuID=statistic.
37
determined by local authorities in the zoning plan, and special
renovation requirements apply there. The renovation requirements are
more detailed for very valuable and valuable buildings; for less valuable
buildings, the renovation requirements are not very restrictive.
Architectural monuments and buildings of cultural and environmental
value also need to be renovated, but often it is not possible or
reasonable to strive for energy class C. Thus, there could be separate
measures for the renovation of architectural monuments and buildings
of cultural and environmental value. These could include lower energy
performance targets than class C in this renovation strategy. The
renovation analysis of wooden apartment buildings of environmental
value21 indicated that it is possible to achieve 20%-30% energy savings
in such buildings if just smaller works aimed at saving energy are carried
out.
6 Renovation 6.1 Renovation of private houses
practices so far The database of Statistics Estonia shows the total amount of
renovation-related building permits and notices as renovation-
related building permits. The data on use permits also reflects the
total of renovation-related use permits and notices. According to
Statistics Estonia22, the renovation of private houses has been
increasing between 2011 and 2018. In the last five years,
Renovation work is done in renovation-related building permits/notices have been issued for
around 500 to 700 private houses
610 and use permits/notices for 300 private houses per year on
a year.
average.
Ehitusload ja ehitusteatised Kasutusload ja kasutusteatised
800
697 702
700 652
581
600
Lubade ja teatiste arv
500 461 449
426
405
400 364 375
300 278 277
200 158
135
114 109
100
0
2011 2012 2013 2014 2015 2016 2017 2018
Figure 20. Building permits/notices and use permits/notices for the renovation of private houses.
21
Arumägi, Endrik. Renovation of Historic Wooden Apartment Buildings. 2015.
https://digikogu.taltech.ee/et/Item/da192f05-1fd6-4079-92e5-4c69ef74df43.
22
Statistics Estonia. Table EH045: Granted building permits and completed dwellings by type of construction,
county and type of residential building (quarters).
38
Ehitusload ja ehitusteatised Building permits and building notices
Kasutusload ja kasutusteatised Use permits and use notices
Lubade ja teatiste arv Number of permits and notices
The number of actual renovations of private houses is likely to be of the
same magnitude as the number of building permits/notices because
not all owners submit a building notice and not all those who have
submitted it will renovate. The volume of renovations not recorded in
the Building Registry could be considerable in the recent decade, but
the amount of unrecorded work should diminish as the national
building data is being digitised. Around 500 to 700 private houses are
estimated to be renovated each year. The recent five-year average net
area of private houses with building permits/notices for renovation is
86,000 m2, i.e. 0.4%, and that of private houses with renovation-related
use permits/notices is 52,000 m2, i.e. 0.3% of the area of private houses
taken into use before 2000.
According to the Building Registry, 39% of building permits for private
house renovation have covered the whole house, which means that the
total floor area fully renovated each year is 35,000 square metres. The
average annual area that needs to be renovated to achieve the target
specified in this strategy is 470,000 square metres, i.e. ~13 times bigger
than it is estimated to be today.
Rekonstrueerimise ehitusload ja ehitusteatised Hinnanguline tervikliku rekonstrueerimise maht
500 000
450 000
Strateegia eesmärgi täitmiseks vajalik keskmine
400 000 aastane tervikliku rekonstrueerimise pindala
Netopind, m2
350 000
300 000
250 000
200 000
150 000
100 000
50 000
0
2011 2012 2013 2014 2015 2016 2017 2018
Figure 21. Building permits/notices for private house renovations, by net area.
Rekonstrueerimise ehitusload ja ehitusteatised Building permits and building notices for
renovation
Hinnanguline tervikliku rekonstrueerimise maht Estimated volume of full renovation
Strateegia eesmärgi täitmiseks vajalik keskmine Average annual full renovation area required
aastane tervikliku rekonstrueerimise pindala for fulfilling the purpose of the strategy
Netopind, m2 Net area, m2
39
The long-term strategy for renovation requires renovation to achieve
at least energy class C. For private houses, this means:
insulation of outer walls (e.g. 15–20 cm of mineral wool);
insulation of the roof or attic (e.g. 20–30 cm of mineral wool);
replacement of windows (triple-glazed);
modernisation of the heating system (geothermal or air-water
heat pump, pellet boiler, etc.);
installation of a ventilation system with heat recovery (a
ventilation unit with supply and extract piping).
The renovation volumes of private houses with use permits/notices
received after renovation are not known, but it could be presumed that
a large part of renovated private houses does not reach energy class C
because, usually, this is not the aim of the owner. Instead, renovations
are done step by step, as financial resources allow.
6.2 Renovation of private houses with the help of financial
aid
With the measure of financial aid for increasing energy performance of
small residential buildings23, aid has been given for the renovation of
more than 500 private houses since October 2016. The aid has been
granted for energy-saving improvements. The aid covers 30% of eligible
costs, and the maximum amount of aid for one private house is
€15,000. With the example of the terms and conditions of the measure,
which were reviewed in the spring of 2020, it is possible to regionally
adjust the scope of the renovation as well as the share and size of the
aid, to address the financing market failures.
Aid requests cover mainly isolated energy-saving improvements, such
as heating system replacement, building envelope insulation and
installation of solar panels for local electricity generation.
Private houses are not renovated just to save energy. There are other
reasons for the renovation. For example, to install a more comfortable
heating system (heat pumps instead of stoves). A full renovation also
might include work to increase the size of the living area (the attic is
taken into use).
Renovation support for private houses is evenly distributed among
regions. Aid requests have been received from all counties.
23
https://kredex.ee/en/services/elamistingimuste-parandamiseks/private-home-renovation-support.
40
90
80
78
70
69
60
56
50
40
39
30 35 34
30
27
20 23 23
21
17 17 16
10 14 13 12
0
Figure 22. Distribution of renovation support requests regarding private houses, November 2019.
Harjumaa Harju County
Tallinn Tallinn
Pärnumaa Pärnu County
Viljandimaa Viljandi County
Lääne-Virumaa Lääne-Viru County
Tartumaa Tartu County
Raplamaa Rapla County
Järvamaa Järva County
Jõgevamaa Jõgeva County
Saaremaa Saare County
Läänemaa Lääne County
Ida-Virumaa Ida-Viru County
Tartu linn Tartu city
Põlvamaa Põlva County
Valgamaa Valga County
Hiiumaa Hiiu County
Võrumaa Võru County
6.3 Renovation of apartment buildings
Around 400 apartment The number of renovations of apartment buildings has increased too.24
buildings are renovated a In the last five years, renovation-related building permits/notices have
year. been issued for 880 and use permits/notices for 380 private houses per
year on average. Around 400 apartment buildings are renovated a year.
24
Statistics Estonia. Table EH045: Granted building permits and completed dwellings by type of construction,
county and type of residential building (quarters).
41
Ehitusload ja ehitusteatised Kasutusload ja kasutusteatised
1200
1115
994 1010
1000
Lubade ja teatiste arv
800
676
639 625 613
600
503 480
415 425
400
321
294
246
183
200 145
0
2011 2012 2013 2014 2015 2016 2017 2018
Figure 23. Renovation-related building and use permits of apartment buildings.
Ehitusload ja ehitusteatised Building permits and building notices
Kasutusload ja kasutusteatised Use permits and use notices
Lubade ja teatiste arv Number of permits and notices
Use permits/notices are obtained after renovation regarding 1.3 M m2
of apartment buildings, i.e. 4% of the floor area of apartment buildings
taken into use before 2000. If to presume that full renovation is mainly
done with the help of support, the average net area of apartment
buildings that have been fully renovated between 2011 and 2018
amounts to 280,000 m2, i.e. 1% of the area of apartment buildings
taken into use before 2000. The average annual area that needs to be
renovated to achieve the target specified in this strategy is ~600,000
square metres, i.e. ~2 times bigger than it is estimated to be today.
Thus, there is no need to increase the number of apartment buildings
that are renovated; instead, the percentage of a full renovation should
be increased.
42
Rekonstrueerimise kasutusload ja kasutusteatised Toetusega terviklikult rekonstrueeritud
1,8
1,6
1,4
Netopind, mln m2
1,2
1,0
Strateegia eesmärgi täitmiseks vajalik
0,8 keskmine aastane tervikliku
rekonstrueerimise pindala
0,6
0,4
0,2
0,0
2011 2012 2013 2014 2015 2016 2017 2018
Figure 24. Renovation-related use permits/notices of apartment buildings, by net area.
Rekonstrueerimise kasutusload ja Use permits and use notices for renovation
kasutusteatised
Toetusega terviklikult rekonstrueeritud Fully renovated with support
Netopind, m2 Net area, m2
Strateegia eesmärgi täitmiseks vajalik keskmine Average annual full renovation area required
aastane tervikliku rekonstrueerimise pindala for fulfilling the purpose of the strategy
The long-term strategy for renovation requires renovation to achieve at
least energy class C. For apartment buildings, this means:
insulation of outer walls (e.g. 15–20 cm of mineral wool);
insulation of the roof or attic (e.g. 30–40 cm of insulation);
replacement of windows (triple-glazed);
replacement of the heating system (for district heating, the
installation of a new two-pipe system with thermostatic valves
on radiators);
installation of a ventilation system with heat recovery (either a
central unit with pipelines within wall insulation or an
extraction heat pump).
The volume of renovation done on apartment buildings that have
received a use permit/notice after renovation is not known, but it may
be presumed that not all of these achieve energy class C. However, the
apartment associations have incurred renovation costs or taken out
loans for bigger work, and it is likely that in the near future, they will
not launch another renovation.
43
6.4 Renovation of apartment buildings with the help of
support
Apartment building renovation support25 has been granted to 453
buildings with a total area of 1.2 million square metres since April 2015.
1,100 apartment buildings As part of the support measure26 implemented between 2010–2014,
have been renovated with 661 apartment buildings with a total area of 1,6 M m2 were renovated.
the help of support since A total of 1,114 apartment buildings have received a positive decision
2010. to their support request. The average is 110 apartment buildings a year.
Support rates depend on the energy class achieved and the location of
the building. In Tallinn and Tartu, the support rate is 30%. In other cities
where apartment values exceed €500 per square metre (mostly county
centres), the support rate is 40%. In regions where the average
apartment value is below €500 per m2, the rate is 50%.
To receive the bigger support rate, energy class C must be achieved. For
that purpose, the building envelope must be insulated, old windows
must be replaced, the heating system must be renovated and a
ventilation system with heat recovery must be installed.
Pursuant to the terms and conditions of the support, new technical
solutions for renovating apartment buildings have been taken into use.
Mechanical ventilation systems with heat recovery have become the
norm. In addition, windows are placed into the insulation layer to
eliminate the cold bridge between windows and external walls. Also,
solar panels are installed for local electricity generation, although this is
not required to receive the support. Also, guidance material has been
compiled regarding the technical solutions for renovation.27
Figure 25. Ventilation pipelines in the external wall insulation, wooden frames to take
windows in between the insulation layer (left) and PV panels (right).
Outside Tallinn and Tartu, it is possible to request a 10% lower support
rate. Then there is no heat recovery requirement for the ventilation
25
Korterelamute rekonstrueerimise toetuse andmise tingimused ja kord [Terms, conditions and procedure for
granting renovation support for apartment buildings]. https://www.riigiteataja.ee/akt/126042019007.
26
Rohelise investeerimisskeemi „Korterelamute rekonstrueerimise toetus” kasutamise tingimused ja kord
[Terms, conditions and procedure for using the green investment scheme ‘Renovation support for apartment
buildings’]. https://www.riigiteataja.ee/akt/110022015002.
27
SA KredEx. Korterelamute välispiirete lisasoojustamise sõlmejoonised ja tüüpkorterite
ventilatsioonilahendused [Drawings of junctions for additional insulation of apartment buildings and
ventilation solutions for standard apartments]. https://kredex.ee/en/increasing-awareness-energy-
performance/energy-performance-existing-buildings.
44
system and energy class D is acceptable. More than 90% of applications
were for the higher support rate, which means they aimed for class C.
In the event of a full renovation, other important work that does not
provide energy saving but is necessary for the safe use of the building is
done as well. This includes the renovation of balconies, electrical
systems, water supply and sanitation systems.
Between 2010 and 2014, the support measure for apartment buildings
helped save 60 GWh of heating energy a year28. This equals the annual
district heat consumption of the city of Haapsalu. The presumable
annual energy savings made with the help of the 2015-2019 support
measure for apartment buildings are around 80 GWh. On average, the
renovation of an apartment building usually results in ~55% of heat
savings and 5% greater electricity consumption.
The problem with the renovation support for apartment buildings is
that its financing is unstable. When the support measure opens, the
number of applications is lower (in 2010 and 2015). In the next couple
of years, the number of applications increases until the budget for the
measure runs out. More stable financing would prevent renovation
volumes from heaping up and the resulting price increases.
Positiivsete toetuse otsuste arv
300
269
250
209
200 191
Toetuse otsuste arv
148
150
110
100
52 51
45
50 39
0
0
2010 2011 2012 2013 2014 2015 2016 2017 2018 2019
Figure 26. The number of successful support applications regarding the renovation of apartment buildings.
Positiivsete toetuse otsuste arv Number of positive support decisions
Toetuse otsuste arv Number of support decisions
The rate of applying for renovation support for apartment buildings
Successfully renovated
apartment buildings in the
varies by regions. Harju, Tartu and Lääne-Viru Counties are much more
neighbourhood have an active than others. The experience with the renovation measures for
important influence on apartment buildings has indicated that new renovations are often near
previously renovated apartment buildings. Renovations in the
28
SA KredEx. Korterelamute renoveerimisturu ülevaade ja perioodi 2010-2014 korterelamute
rekonstrueerimistoetuse mõju analüüs [Overview of apartment building renovation market and impact
analysis of the renovation support measure for apartment buildings between 2010 and 2014].
45
the launch of new neighbourhood are an incentive for other apartment associations to
renovations. start renovating as well. In addition, there are already several technical
consultants in the region who have helped apartment associations with
their renovation. Their experience is valuable for other apartment
associations during their renovation process.
Figure 27. The number of successful support applications regarding the renovation of apartment buildings, by counties.
Hiiumaa Hiiu County
Saaremaa Saare County
Läänemaa Lääne County
Harjumaa Harju County
Lääne-Virumaa Lääne-Viru County
Ida-Virumaa Ida-Viru County
Raplamaa Rapla County
Järvamaa Järva County
Jõgevamaa Jõgeva County
Pärnumaa Pärnu County
Viljandimaa Viljandi County
Tartumaa Tartu County
Valgamaa Valga County
Põlvamaa Põlva County
Võrumaa Võru County
46
6.5 Renovation of non-residential buildings
The number of renovation-related use permits/notices29 for non-
residential buildings has been relatively similar throughout the years.
The sharp increase in the number in 2012 was caused by the renovation
programme for public-sector buildings, which was financed from the
proceeds from the sales of emission allowances.
Büroo Majutus Kaubandus ja teenindus Haridus ja teadus Tervishoid Laod Tööstus
250
200
Kasutuslubade arv
150
100
50
0
2011 2012 2013 2014 2015 2016 2017 2018
Figure 28. Renovation-related use permits/notices of non-residential buildings.
Büroo Office
Majutus Accommodation
Kaubandus ja teenindus Commerce and service
Haridus ja teadus Education and research
Tervishoid Healthcare
Laod Warehouses
Tööstus Industry
Kasutuslubade arv Number of use permits
On average, 320 use permits/notices for the renovation of non-
Around 300 non-
residential buildings are
residential buildings have been granted in the recent five years. The
renovated each year. annual average net area of non-residential buildings with renovation-
related use permits/notices is 860,000 m2, i.e. 3% of the area of non-
residential buildings taken into use before 2000. According to the
Building Registry, 21% of building permits for the renovation of non-
residential buildings have covered the whole building in the recent
three years, which means that the total floor area fully renovated each
year is around 170,000 square metres. The average area that needs to
be renovated each year to achieve the target specified in this strategy
is ~730,000 square metres, i.e. ~4 times bigger than it is estimated to
be today. Thus, there is no need to increase the number of non-
29
Statistics Estonia. EH046: Granted building permits and completed non-residential buildings by type of
construction, county and type of buildings (quarters).
47
residential buildings that are renovated; instead, the percentage of a
full renovation should be increased.
Rekonstrueerimise kasutusload ja kasutusteatised Hinnanguline tervikliku rekonstrueerimise osakaal
2,0
1,8
1,6
1,4
Netopind, mln m2
1,2
Strateegia eesmärgi täitmiseks vajalik keskmine
aastane tervikliku rekonstrueerimise pindala
1,0
0,8
0,6
0,4
0,2
0,0
2011 2012 2013 2014 2015 2016 2017 2018
Figure 29. Renovation-related use permits/notices of non-residential buildings with climate control, by net area.
Rekonstrueerimise kasutusload ja Use permits and use notices for renovation
kasutusteatised
Hinnanguline tervikliku rekonstrueerimise Estimated share of full renovations
osakaal
Netopind, mln m2 Net area, M m2
Strateegia eesmärgi täitmiseks vajalik keskmine Average annual full renovation area required
aastane tervikliku rekonstrueerimise pindala for fulfilling the purpose of the strategy
Each year, the central The Energy Performance of Buildings Directive applies to the buildings
government must of the central government and stipulates an obligation for them to
renovate 3% of the area of renovate each year at least 3% of buildings that have over 250 square
their buildings. metres of useful floor area and do not comply with the minimum
requirements so that these meet the minimum requirements
afterwards. Estonia has honoured the 3% obligation.30 On average,
more than 4% of buildings covered by the obligation have been made
compliant with the minimum requirements between 2015 and 2018.
To meet the 3% obligation, it is necessary to renovate around
25,000 m2 a year. The majority of the buildings made compliant with
the requirements belong to the State Real Estate Company Riigi
Kinnisvara AS.
The analysis of renovations made on private-sector non-residential
buildings, as made for this strategy, indicated that the renovations do
not result in energy class C. People mostly make easier and faster
energy-saving improvements that do not hinder the use of the building
during the work and that are paid off in 5 to 7 years. A full renovation
30
Ministry of Finance. Riigi kinnisvara valitsemise koondaruanne 2015-2018 [Summary report on state real
estate management 2015-2018].
48
that includes insulation of the building envelope usually has too long a
pay-off period for commercial property owners.
6.6 Renovation cost
The renovation cost data is based on the period from 2015 to 2019.
The renovation cost data regarding private houses are based on the
The average cost of a full information on the respective support measure between 2016 and
renovation of a private 2019. The analysis of support requests covered a selection of
house is around €400/m2. applications that covered insulation of the building envelope,
replacement of windows, replacement of the heating system and
installation of a new ventilation system. The cost of the full renovation
was between €210 and €560 per square metre (VAT included). The
average full-renovation cost was €360 per square metre of a private
house. The renovations made by the owner cost less. The average cost
of renovations made at least partially by the owner was €297 per
square metre. The average cost of private-house renovations done by
construction companies was €397 per square metre. For this strategy,
the estimated full-renovation cost of a private house is €400/m2,
presuming that most private-house owners will not renovate
themselves. Thus, the renovation cost of a medium-sized private house
(150 m2) is around €60,000.
600
TERVIKLIKU REKONSTRUEERIMISE MAKSUMUS, €/M2
500
400
300
200
100
0
TERVIKLIKU REKONSTRUEERIMISE VALIMI PROJEKTID ESITATUNA MAKSUMUSE JÄRJEKORRAS
Figure 30. Full-renovation cost of private houses per metre of net area.
Tervikliku rekonstrueerimise maksumus, €/m2 Cost of full renovation €/m2
Tervikliku rekonstrueerimise valimi projektid Projects of the full renovation sample in the
esitatuna maksumuse järjekorras order of cost
The cost data regarding the renovation of apartment buildings is based
The average cost of the
on the information on the respective support measure. The average
full renovation of an full-renovation cost of apartment buildings that received support
between 2015 and 2017 is €285 per square metre (VAT included).
Apartment buildings where some of the energy-saving improvements
49
apartment building is have already been done earlier (e.g. the heating system has been
around €300/m2. renovated) and those with the larger net area have lower renovation
costs. Renovation of smaller apartment buildings (fewer than 10
apartments) and those of the cultural and environmental value costs
more. The average apartment building that has applied for full-
renovation support has 2,600 m2 of net area (40 apartments), which
means that the average cost of a full renovation of one building is
~€800,000.
700
TERVIKLIKU REKONSTRUEERIMISE MAKUSMUS, €/M2
600
500
400
300
200
100
0
TERVIKLIKU REKONSTRUEERIMISE VALIMI PROJEKTID ESITATUNA MAKSUMUSE JÄRJEKORRAS
Figure 31. Full-renovation cost of apartment buildings per metre of net area.
Tervikliku rekonstrueerimise maksumus, €/m2 Cost of full renovation, €/m2
Tervikliku rekonstrueerimise valimi projektid Projects of the full renovation sample in the
esitatuna maksumuse järjekorras order of cost
The data on the apartment-building renovation measure shows that
the increasing numbers of renovations are accompanied by increasing
costs. In addition to the increased demand, the cost increases are the
result of the increased renovation volumes ordered by apartment
associations. After gaining more experience with renovating, the
measure will cover more apartment buildings that, besides required
improvements, make other improvements needed for the functioning
of the building, such as replacement of the electrical, water and
sanitation systems, installation of solar panels, construction of new
balconies to replace the old ones, etc. For this strategy, the full-
renovation cost of an apartment building is estimated to be €300/m2.
Table 18. Apartment building renovation cost dynamics.
Full renovation applications Renovation cost, €/m2
Average Median
2015 30 249 230
2016 124 264 251
2017 173 300 287
The renovation cost of public-sector buildings is based on the data of
the 2019 support measure for energy performance of central-
government buildings. The renovation costs are between €700 and
50
€2,000 per square metre (VAT included). Projects with higher
renovation costs also include building extensions. The average
renovation cost, extensions excluded, is around €1,100/m2, whereas
the energy-saving improvements account for ~€600/m2 of it. The cost
of energy-saving improvements made during the renovation and that
of other improvements are shown in the table below.
Energiasäästu tööd Muud ehitustööd
2500
TERVIKLIKU REKONSTRUEERIMISE MAKSUMUS, €/M 2
2000
1500
1049 1369
726
1338
1000
346 319
146 980
500 385
908 840
737 719 748 658
491
355 354
0
TERVIKLIKU REKONSTRUEERIMISE PROJEKTID ESITATUNA MAKSUMUSE JÄRJEKORRAS
Figure 32. Full-renovation cost of public-sector buildings per metre of net area.
Energiasäästu tööd Energy saving work
Muud ehitustööd Other construction work
Tervikliku rekonstrueerimise maksumus, €/m2 Cost of full renovation, €/m2
Tervikliku rekonstrueerimise projektid Projects of the full renovation sample in the
esitatuna maksumuse järjekorras order of cost
The renovation costs of private-sector non-residential buildings have
been calculated on the basis of the analysis of such work. In private-
sector buildings (mostly offices, commercial and service buildings),
energy savings are the most cost-effectively achievable by replacing the
building services systems. On market terms, so far, mostly just smaller
work costing €10 to €20 per m2 has been done.
Table 19. Energy performance improvement measures for non-residential buildings.
System/structural Minimum renovation Maximum renovation Cost, €/m2
part
Building Upgrade/adjustment of the System replacement/creating a new 2-25
automation system system
Ventilation Ventilation unit replacement Replacement of the unit and system 15-60
and configuration with a new unit and system, increasing
functionality, needs-based
management, etc. or installing the
system if the building did not
previously have climate control
Illumination Replacement of fluorescent Replacement of the illumination of the 5-30
tubes with LED tubes whole building with LED lamps and
needs-based management
Heating system Balancing of the system, Creating a new comprehensive system 5-30
replacement of the heat and/or replacement of the heat source
source
51
Cooling system Balancing of the system, Creating a new comprehensive system 15-35
replacement of the cooling or adding one if the building did not
unit previously have climate control
Monitoring Measurement of the actual Measurement of the actual 1-10
consumption consumption, establishing a web-based
cost calculation system,
monitoring/analysis
Commercial cooling Using residual heat, fitting Creating a new comprehensive system 15-50
systems31 refrigerators with doors
Window/glass Sun control film installation Window or glass facade replacement 5-50
facade
In buildings where upgrading the building services system is sufficient
A full renovation of a
commercial property costs
for achieving energy class C, renovation work costs around €200/2 (VAT
around €200/m2 if only the included). Upgrading the building services system is sufficient in
building services systems buildings where electricity accounts for the majority of energy
are upgraded and around consumption. For example, offices and service buildings where
600 €/m2 if the building illumination, appliances, cooling and ventilation account for the
envelope is also upgraded. majority of energy consumption.
In buildings where heating accounts for the majority of energy
consumption, the building envelope must also be insulated and
windows replaced in order to achieve energy class C. These include
schools, nursery schools, hospitals and accommodation
establishments. In the case of buildings whose building envelopes also
require upgrading during renovation, the cost of work related to energy
savings in public sector building renovations of €600/m2 is considered
as the cost of renovation.
Office buildings and commercial buildings form 1/3 of the floor area of
private sector non-residential buildings. The average renovation cost of
private sector non-residential buildings calculated in the strategy is
0.33 × 200 + 0.67 × 600 = €450/m2.
Building demolition costs are based on the local government support
The cost of demolishing
disused buildings is
measure, the purpose of which is to demolish residential buildings and
around €50/m2. non-residential buildings that have fallen out of use. The cost of
demolition has ranged from €10 to €140/m2 (VAT included). The cost
of demolition per square metre of the net area is higher in the case of
small buildings (under 100 m2). The average demolition cost is €43/m2.
The strategy considers €50/m2 as the cost of demolition.
31
In the energy performance calculation methodology, cooling systems are process energy, which is not taken
into account in the building’s energy performance, but those used in commerce are large energy-intensive
systems.
52
160
140
120
Lammutamise maksumus, €/m2
100
80
60
40
20
0
Lammutamise maksumused esitatuna maksumuse järjekorras
Figure 33. The cost of demolishing disused buildings per square metre of net area.
Lammutamise maksumus, €/m2 Cost of demolition, €/m2
Lammutamise maksumused esitatuna Costs of demolition in the order of cost
maksumuse järjekorras
6.7 Energy savings achieved by renovation
Full renovation of buildings can lead to heat energy savings of around
50% on average. Renovation may increase electricity use in buildings
that did not previously have mechanical ventilation systems (private
houses, apartment buildings and educational buildings), because the
building services systems required for climate control consume
electricity. Renovation reduces the use of electricity in office buildings
and commercial and service buildings where electricity accounted for
the majority of energy consumption also before renovation. The use of
primary energy is reduced by 32% on average.
The values of heating, electricity and weighted specific energy use (the
so-called WSEU label that is based on measured consumption data) are
presented in the table below. The values are given for two heat sources:
efficient district heating (weighting factor 0.65) and natural gas
(weighting factor 1.0). The electricity weighting factor is 2.0.
Private houses differ from other building types, as in this case, stove
heating is considered in the pre-renovation stage (the weighting factor
of woodfuels is 0.65) and a geothermal heat pump in the post-
renovation stage. As the electricity consumption increases significantly,
the total reduction of primary energy consumption is considerably
lower than in the case of other building types.
Table 20. Changes in energy use.
Before renovation, kWh/(m2y) After renovation, kWh/(m2y) Reduction, %
53
Efficient Heating Electricity WSEU Heating Electricity WSEU Heating Electricity WSEU
district
heating
Private 190 25 174 0 65 130 100% -160% 25%
house*
Apartment 170 35 181 70 38 122 59% -9% 33%
building
Office 130 70 225 70 45 136 46% 36% 40%
Commerce 80 140 332 55 85 206 31% 39% 38%
Education 140 30 151 55 40 116 61% -33% 23%
Natural gas Before renovation, kWh/(m2y) After renovation, kWh/(m2y) Reduction, %
Heating Electricity WSEU Heating Electricity WSEU Heating Electricity WSEU
Private 190 25 174 0 65 130 100% -160% 25%
house*
Apartment 170 35 240 70 38 146 59% -9% 39%
building
Office 130 70 270 70 45 160 46% 36% 41%
Commerce 80 140 360 55 85 225 31% 39% 38%
Education 140 30 200 55 40 135 61% -33% 33%
*transition from a stove to a heat pump is taken into account in the case of private houses
A final energy consumption reduction of up to 6.9 TWh (59%) could be
The final energy
consumption reduction
possible if the buildings covered with the strategy were fully renovated.
potential is around 60%. Heating consumption can be lowered up to 6.4 TWh (70%) and
electricity consumption up to 0.5 TWh (20%). The use of electricity
changes considerably less compared to heating because buildings that
previously lacked compliant climate control must be fitted with
appropriate building services systems, which results in a slight increase
in electricity consumption.
In addition to renovation, the final energy consumption of buildings
addressed in the strategy reduces on the account of buildings falling
into disuse. As at 2020, the total area of buildings in use is 76 M square
metres. The total area of buildings that are not fully renovated is 70 M
square metres. Considering the forecasted abandonment (around 20%
of the area), 54 M square metres will need renovation by 2050.
Table 21. Change in final energy consumption.
Final Final consumption 2020 Final consumption 2050 Reduction, %
consumption TWh/y TWh/y
Heating Electricity TOTAL Heating Electricity TOTAL Heating Electricity TOTAL
Private house* 2.9 0.4 3.2 0.5 0.6 1.1 82% -49% 67%
Apartment 3.1 0.6 3.8 1.0 0.5 1.6 68% 15% 59%
building
Office 0.4 0.2 0.7 0.2 0.1 0.3 58% 49% 55%
Commerce 0.3 0.4 0.7 0.1 0.2 0.4 45% 51% 49%
Education 0.4 0.1 0.5 0.1 0.1 0.2 66% -15% 52%
Other 1.9 0.9 2.8 0.7 0.6 1.3 64% 34% 55%
buildings
9.0 2.7 11.7 2.7 2.1 4.8 70% 20% 59%
*in the case of private houses it is considered that 50% of private houses will install a heat pump and 50% a boiler as a heat
source
In 2020, the total CO2 emissions of the buildings addressed in the
The CO2 emission
reduction potential is
strategy are 4.4 M t CO2/y. Considering the renovation volumes
around 90%. proposed in the strategy and the estimated reduction of the specific
emissions of CO2 from the electricity and district heating until 2050, the
54
CO2 emissions reduction potential of renovation of existing buildings is
around 3.9 M t CO2/y, which forms 89% of current CO2 emissions.
The 2020 specific emission factors of energy carriers are based on the
study “Energiakandjate kaalumistegurid” [Weighting Factors for Energy
Carriers]32. Electricity has a specific emission factor of 1.15 t CO2/MWh
and heating 0.15 t2/MWh. The specific emission factors for the period
2020-2050 are based on the study “Eesti kliimaambitsiooni tõstmise
võimaluste analüüs” [Reaching Climate Neutrality in Estonia]33. The
average specific emission factors for the period 2020-2030 are 0.83 t
CO2/MWh for electricity and 0.12 t CO2/MWh for heating. The average
specific emission factors for the period 2030-2040 are 0.31 t CO2/MWh
for electricity and 0.09 t CO2/MWh for heating. The average specific
emission factors for the period 2040-2050 are 0.16 t CO2/MWh for
electricity and 0.05 t CO2/MWh for heating.
Table 22. Changes in CO2 emissions.
CO2 emissions CO2 emissions in 2020, t/y CO2 emissions in 2050, t/y Reduction, %
Heating Electricity TOTAL Heating Electricit TOTAL Heatin Electricit TOTA
y g y L
Private house* 429,000 432,000 860,000 25,000 90,000 120,00 94% 79% 86%
0
Apartment 467,000 737,000 1,200,00 50,000 88,000 140,00 89% 88% 88%
building 0 0
Office 66,000 270,000 340,000 9,000 19,000 30,000 86% 93% 91%
Commerce 38,000 515,000 550,000 7,000 35,000 40,000 82% 93% 93%
Education 62,000 102,000 160,000 7,000 16,000 20,000 89% 84% 88%
Other 288,000 1,030,00 1,320,00 34,000 94,000 130,00 88% 91% 90%
buildings 0 0 0
1,350,00 3,086,00 4,430,00 132,00 342,000 480,00 90% 89% 89%
0 0 0 0 0
*in the case of private houses it is considered that 50% of private houses will install a heat pump and 50% a boiler as a heat
source
The analysis of final energy consumption and CO2 emission reduction
of the buildings does not include buildings erected after 2000 and new
buildings erected between 2020-2050.
6.8 Conclusions on renovation activity to date
Current renovation activities have not been sufficient for renovating the
existing buildings by 2050. If current trends continue, 80% of private
houses, 68% of apartment buildings and 60% of non-residential buildings
will remain unrenovated by 2050. Of the buildings addressed in the
strategy, only the buildings owned by the central government will be
renovated in the volume required per year, the total area of which forms a
very small share (~1.5%) of all of the buildings that need renovation.
Renovation of private houses mainly depends on the owner’s wish to
commence renovation work and their capacity to make investments. Many
32
Tallinn University of Technology. Energiakandjate kaalumistegurid [Weighting Factors for Energy Carriers].
2017
33
SEI Tallinn. Eesti kliimaambitsiooni tõstmise võimaluste analüüs [Reaching Climate Neutrality in Estonia].
2019. https://www.sei.org/publications/eesti-kliimaambitsiooni-tostmise-voimaluste-analuus/
55
private house owners do not have the financial capacity to undertake a full
renovation all at once. The cost of a full renovation of a medium-sized
private house (~160 m2) is around €60,000. Incomes do not allow many
owners of private houses to make larger investments at once and
renovation is conducted step by step.
Apartment buildings have been renovated in full in Estonia for already 10
years. The financing system, the technical solutions and apartment
associations’ desire to renovate are there. The main bottlenecks to date
have been the unstable financing of support measures and uneven regional
distribution of aid. Apartment buildings located outside centres require
more support in terms of both financing and advice. 50% support is not
always sufficient in regions with low-value real estate as banks may not
grant apartment associations loans in the amount required for a full
renovation. Energy costs are low compared to the cost of renovation,
which affects the cost-efficiency of renovation. Even with a 40% support
the total expenses of apartment owners (energy, renovation loan and
maintenance) increase around 20% after renovation.
The owner’s initiative is paramount when renovating residential buildings.
A survey by Statistics Estonia34 on the energy consumption of households
highlighted that 38.1% of the surveyed households have not improved the
heat retention of their homes. Around a half (46.4%) reported lack of
money as the reason. 17.1% considered the existing heating sufficient and
14.6% lived in recently built buildings, which did not require insulation. 58%
of households that had not improved heat retention were not planning to
insulate their homes in the future.
Central-government buildings are subject to the obligation to renovate 3%
of the floor area per year according to the energy efficiency directive.
Estonia has fulfilled this obligation. As a bottleneck, the summary report on
state real estate management highlighted that making central-government
buildings comply with the minimum energy performance requirements for
buildings has not previously been a planned or managed activity, as there
is no long-term investment plan.
Local governments renovate using both support and their own funds, but
the volume of renovation with own funds and the specific link between
renovation with both own funds and support and energy savings cannot be
assessed on the basis of data available. The State Audit Office report35 that
analysed the condition of buildings owned by local governments
highlighted insufficient volume of aid allocated for renovation and the
fragmentation of support as the main deficiencies of support measures
designed for local government buildings. A third of buildings that received
support are still in poor condition, as small aid amounts allowed buildings
to be renovated only partially.
34
Statistics Estonia. Leibkondade energiatarbimise uuring [Household Energy Consumption Survey]. 2012
35
State Audit Office. Problems related to the use of European Union and other infrastructure support in local
governments. 2017
56
Interviews conducted with owners of private sector non-residential
buildings show that the current functioning logic of the commercial
property market is not conducive to carrying out full renovations. The
tenant covers the building management expenses and energy costs form a
small share of the total expenses. Conscious tenants are more interested
in good interior climate than the building’s energy performance.
Renovation work is mainly initiated due to a change in the building’s use,
change of ownership, change of tenant and other activities rather than high
energy costs. Energy costs are generally covered by the tenant. Thus, the
owner of the real estate does not have a direct motivation to improve
energy performance. People are not yet interested in or are unable to look
at the indirect benefit and the bigger picture.
At the same time, commercial property owners are aware that buildings
are aging and property owners are forced to upgrade their buildings in
order to stay on the market. The volume of renovation is the main question
upon planning work. Larger projects with a payback period of over 20 years
are not attractive to owners. Owners of commercial real estate expect the
payback period of the investment to be less than 10 years.
Owners of private sector non-residential properties highlighted constant
changes to energy performance regulations as another major problem.
Requirements that are amended every five years and changes in
calculation methodology (e.g. changes in weighting factors) make
preparing a long-term view more difficult. Future energy performance
requirements for buildings are unknown. Property owners would like to
know the changes to be introduced in building energy performance
regulations and implementation time of new requirements at least 10
years in advance. Additionally, changes resulting from energy calculation
methodology (e.g. changes in weighting factors) do not affect the building’s
actual energy use and energy use-related costs to the property owner.
57
7 Volumes until 7.1 Renovation need
2050 Considering the number of residential buildings currently in use, the
volume of renovations completed to date and the estimated residential
building abandonment rate, 105,000 private houses with a total area of
14 M m2 and 14,000 apartment buildings with a total area of 18 M m2
should be renovated in full by 2050. A full renovation means a
renovation that results in at least energy class C.
Table 23. Residential building renovation volume up to 2050.
Existing Renovated Falling into disuse In need of renovation
Quantity Area, m2 Quantity Area, m2 Quantity Area, m2 Quantity Area, m2
Private houses 155,000 19,998,000 10,000 1,500,000 40,000 4,800,000 105,000 14,000,000
Apartment 22,600 28,378,000 3,000 5,000,000 5,300 5,000,000 14,000 18,000,000
buildings
0.9 M square metres of central-government buildings and 4 M square
metres of local government buildings in the non-residential sector and
17 M square metres of buildings in the private sector need renovation.
The total area of residential buildings that need renovation is 22 M
square metres.
According to the central-government building energy performance
inventory36, as at 2017, 812,000 m2 needed to be brought in line with
the minimum energy performance requirements. In the strategy, the
area of central-government buildings is somewhat larger than what is
reported in the energy performance inventory because the strategy
includes buildings that are not covered by the inventory (e.g. the
buildings of the State Forest Management Centre that are entered in
the State Real Estate Registry). The difference between the total area
of buildings in need of renovation and the areas provided in the central
government building energy performance inventory and the strategy is
6%, which does not significantly affect the required annual renovation
volume of central-government buildings.
Table 24. Renovation need of non-residential buildings until 2050.
Central Local government Private sector Total
government
Area, m2 Area, m2 Area, m2 Area, m2
OFFICE 271,000 279,000 2,760,000 3,310,000
ACCOMMODATION 74,000 207,000 520,000 801,000
COMMERCE AND 69,000 712,000 2,440,000 3,221,000
SERVICES
36
Ministry of Finance. Energiatõhususe inventuuri aruanne [Energy Performance Inventory Report]. 2017
https://www.rahandusministeerium.ee/et/eesmargidtegevused/riigi-kinnisvararegister/portfelli-
ulevaade/energiatohususe-inventuur
58
EDUCATION, RESEARCH 243,000 2,212,000 690,000 3,145,000
HEALTHCARE 12,000 205,000 590,000 807,000
WAREHOUSES 19,000 3,060,000 3,079,000
INDUSTRY 7,000 6,880,000 6,887,000
SPECIAL-PURPOSE 164,000 150,000 314,000
BUILDINGS
OTHER 427,000 0 427,000
860,000 4,000,000 17,100,000 22,000,000
Taking into account all private houses (14 M square metres), apartment
buildings (18 M square metres) and non-residential buildings (22 M
square metres), a total of 54 M square metres of buildings are in need
of renovation by 2050. A full renovation can immediately be
undertaken in building sectors that already have functioning full
renovation processes: central-government buildings, local government
buildings and apartment buildings. Building sectors, where the full
renovation market is still waiting to be built, such as private sector non-
residential buildings and private houses, will likely taken up at a later
time. The creation of processes required for full renovation of these
buildings should also commence immediately, but since the
implementation of solutions and processes takes time, the majority of
the renovation activity is estimated to take place between 2035-2045.
Üksikelamud Korterelamud Erasektori mitteeluhooned KOV hooned Keskvalitsuse hooned
1 000 000
AASTAS TERVIKLIKULT REKONSTRUEERITAV PINDALA, M 2
900 000
800 000
700 000
600 000
500 000
400 000
300 000
200 000
100 000
0
2020 2025 2030 2035 2040 2045 2050
Figure 34. Renovation need by building sectors.
Üksikelamud Private houses
Korterelamud Apartment buildings
Erasektori mitteeluhooned Private sector non-residential buildings
KOV hooned Local government buildings
Keskvalitsuse hooned Central-government buildings
Aastas terviklikult rekonstrueeritav pindala, m2 Fully renovated area per year, m2
When looking at the total annual volumes of different building sectors,
the area of buildings that should be fully renovated between 2035-2040
is ~2.3 M square metres, which constitutes around a fivefold increase
compared to the current volumes.
59
Keskvalitsuse hooned KOV hooned Üksikelamud Korterelamud Erasektori mitteeluhooned
2 500 000
AASTAS TERVIKLIKULT REKONSTRUEERITAV PINDALA, M 2
2 000 000
1 500 000
1 000 000
500 000
0
2 020 2 025 2 030 2 035 2 040 2 045 2 050
Figure 35. Cumulative annual renovation needs.
Keskvalitsuse hooned Central-government buildings
KOV hooned Local government buildings
Üksikelamud Private houses
Korterelamud Apartment buildings
Erasektori mitteeluhooned Private sector non-residential buildings
Aastas terviklikult rekonstrueeritav pindala, m2 Fully renovated area per year, m2
Upon distributing renovation volumes, the average annual volumes of
renovations completed to date are regarded as the situation as at 2020.
Upon preparing calculations, the full programme is considered, i.e. all
of the existing buildings are renovated by 2050. 22% of the area of
unrenovated buildings would be renovated by 2030, 64% by 2040 and
100% by 2050. In practice, it can be assumed that around 20% of
privately owned buildings (private houses, apartment buildings, private
sector non-residential buildings) will remain unrenovated, because the
owners do not wish to renovate their buildings.
Table 25. Renovation volumes proposed by the strategy until 2050, by floor area.
Area to be renovated, m2
2021-2025 2026-2030 2031-2035 2036-2040 2041-2045 2046-2050 TOTAL
Private houses 400,000 950,000 1,900,000 3,100,000 3,900,000 3,800,000 14,000,000
Apartment buildings 2,280,000 3,200,000 4,000,000 3,900,000 3,000,000 1,800,000 18,000,000
Private-sector non-
840,000 1,800,000 3,200,000 4,200,000 4,100,000 2,900,000 17,000,000
residential buildings
Local government 680,000 1,400,000 1,300,000 480,000 70,000 0 4,000,000
buildings
Central-government 200,000 240,000 230,000 150,000 70,000 20,000 900,000
buildings
4,400,000 7,600,000 10,600,000 11,800,000 11,100,000 8,500,000 53,900,000
7.2 Financing needs
The renovation costs of the buildings is calculated using the 2019 costs
The full renovation of all of full renovation and the annually renovated areas provided in the
buildings costs around €22 previous chapter. The renovation cost of public sector buildings takes
B.
60
into account the cost of renovation work related to energy savings of
€600/m2. Renovation of public sector buildings is often initiated on
grounds other than energy saving and the average cost of full
renovation of the buildings is around €1,100/m2. As the aim of the
strategy is to attain the climate goals, only the cost of the work to
achieve energy savings is taken into account when calculating the costs.
In the case of the cost of renovating private sector non-residential
buildings, it is considered that the cost is €600/m2 even in the case of
buildings whose building envelopes also need upgrading
(approximately 2/3 of the buildings). The cost of renovation of buildings
where upgrading building services systems will suffice is around
€200/m2 (approximately 1/3 of the buildings). The average renovation
cost of private sector non-residential buildings calculated in the
strategy is 0.33 × 200 + 0.67 × 600 = €450/m2.
The annual renovation funding need will increase 4 to 5 times from the
current around 200 M euros per year to around 900 M euros per year.
On the basis of the cost of 2019 renovations, the total cost of the full
renovation of buildings in need of renovation would be around €22 B.
The average cost of the full renovation of all buildings is around
€400/m2 (€24 B / €54 M square metres).
In the coming years, the measures of the long-term renovation strategy
will be implemented using the state’s tax revenue, the funds of the
European Union budget framework for 2014-2020 (above all, the funds
of the European Regional Development Fund, the Cohesion Fund and,
to a smaller extent, Horizon 2020) and the auctioning revenue from the
European Union scheme for greenhouse gas emission allowance
trading (in accordance with the objectives listed in Article 10 (3) of
directive 2003/87/EC117, subsection 161 (4) of the Atmospheric Air
Protection Act and the state’s budgetary strategy).
A more specific distribution of measures, the schedule and state budget
funds allocated for execution thereof are, among other things, decided
upon preparing the state mid-term budgetary strategy. Considering the
high importance of the renovation wave in the documents of the
European Green Deal and the European Union Recovery Plan, it would
be reasonable to ensure respective Union financial instruments for
Member States.
Table 26. Costs of the renovations proposed by the strategy until 2050.
Renovation cost, €M
Cost, €/m2 2021-25 2026-30 2031-35 2036-40 2041-45 2046-50 TOTAL
Private houses 400 161 381 776 1,236 1,541 1,504 5,600
Apartment buildings 300 683 953 1,189 1,160 886 530 5,400
Private-sector non- 450 379 811 1,437 1,884 1,828 1,312 7,650
residential buildings
Local government 600 409 869 792 287 41 2 2,400
buildings
Central-government 600 119 142 136 90 41 13 540
buildings
1,749 3,156 4,330 4,657 4,337 3,361 21,590
61
1 000
900 927
REKONSTRUEERIMISE AASTANE MAKSUMUS, MLN €
915
800
808
754
700
600
572
500
400 431
300
200
187
100
0
2020 2025 2030 2035 2040 2045 2050
Figure 36. Annual financing needs for the full renovation of the buildings.
Rekonstrueerimise aastane maksumus, mln € Annual cost of renovation, M €
The support rates of the current support measure are considered as
possible support for full renovation. For renovating with the help of
support, the annual need for support would be up to €400 M based on
the 2019 costs. The more specific forecast covers the period until 2030.
The financial needs for the support for subsequent periods are to be
specified later, as the nature and implementation of measures change
over time – at first, the proportion of support will likely be higher in
order to get the renovation process going, while later implementation
will focus on loans and other measures that are more suitable for the
market logic and have a smaller effect on the state budget. The financial
needs for the support will be specified during the merging of the
Estonian National Energy and Climate Plan and the building renovation
strategy and the subsequent regular updating thereof. The final
decisions on financing the support required for implementing the
strategy are made during the state budgetary strategy preparation
process.
Table 27. Support needs until 2030.
Renovation support, €M
Support, % 2020-2025 2026-2030
Private houses 30 48 114
Apartment buildings 40 273 381
Private-sector non- 40 152 324
residential buildings
Local government buildings 50 204 435
Central-government 100* 119 142
buildings
796 1,396
* This is not the usual financial support as the central government is the owner
of the buildings.
62
400
373
350
354
329
300
295
TOETUS AASTAS, MLN €
250
200
195 202
150
100
87
50
0
2020 2025 2030 2035 2040 2045 2050
Figure 37. Annual financial support for the full renovation of the buildings.
Toetus aastas, mln € Annual support, M €
63
8.1 Volume of new residential building construction
8 New The construction of new residential buildings shows an upward trend.
buildings In the last five years, building permits have been issued for 1,600 and
use permits for 1,200 private houses per year on average. The annual
On average, 1,200 new average net area of new private houses with use permits is 200,000 m2,
private houses are taken which forms 1% of the area of private houses taken into use before
into use per year. 2000.
Ehitusload Kasutusload
2 500
2 000 1 908
1 745
1 606
1 500 1 436
1 386
1 329
1 277
1 228
1 168
1 068
950 960
1 000
766 808 788
632
500
0
2011 2012 2013 2014 2015 2016 2017 2018
Figure 38. Building and use permits of new private houses.
Ehitusload Building permits
Kasutusload Use permits
53% of new private houses taken into use are located in Harju County,
New private houses are
built all across Estonia.
but new private houses that have been authorised for use can be found
in every county.
64
Figure 39. Distribution of private houses that have been granted use permits as of 2011 by counties (based on the 2019
administrative division).
Hiiumaa Hiiu County
Saaremaa Saare County
Läänemaa Lääne County
Harjumaa Harju County
Lääne-Virumaa Lääne-Viru County
Ida-Virumaa Ida-Viru County
Raplamaa Rapla County
Järvamaa Järva County
Jõgevamaa Jõgeva County
Pärnumaa Pärnu County
Viljandimaa Viljandi County
Tartumaa Tartu County
Valgamaa Valga County
Põlvamaa Põlva County
Võrumaa Võru County
In the last five years, building permits have been issued for 180 and use
An average of 125 new
apartment buildings are
permits for 125 apartment buildings per year on average. The annual
taken into use annually. average net area of new apartment buildings with use permits is 1.2
m2, which forms 0.4% of the area of apartment buildings taken into use
before 2000.
65
Ehitusload Kasutusload
250
201
200 185
172
163
153
150
125 121
102
96
100 89
75 88
63 65
52
50 42
0
2011 2012 2013 2014 2015 2016 2017 2018
Figure 40. Building and use permits of new apartment buildings.
Ehitusload Building permits
Kasutusload Use permits
New apartment buildings are mainly built in three regions: Harju, Tartu
New apartment buildings
are mainly built in Harju
and Pärnu Counties. 70% of new apartment buildings taken into use are
County and Tartu County. located in Harju County (52% in Tallinn) and 23% in Tartu County. Six
counties have not taken into use any new apartment buildings in the
last nine years.
Figure 41. Distribution of apartment buildings that have been granted use permits as of 2011 by counties (based on the 2019
administrative division).
Hiiumaa Hiiu County
Saaremaa Saare County
66
Läänemaa Lääne County
Harjumaa Harju County
Lääne-Virumaa Lääne-Viru County
Ida-Virumaa Ida-Viru County
Raplamaa Rapla County
Järvamaa Järva County
Jõgevamaa Jõgeva County
Pärnumaa Pärnu County
Viljandimaa Viljandi County
Tartumaa Tartu County
Valgamaa Valga County
Põlvamaa Põlva County
Võrumaa Võru County
9 Impact of 9.1 Share of renovation in construction sector
renovation According to Statistics Estonia, in 2018, Estonian construction
companies performed construction work in Estonia and foreign
countries in the total amount of €3 B, of which buildings accounted for
€1.9 B and civil engineering works €1.1 B. The financial volumes of
construction work have increased significantly over the recent years,
but the number of workers employed by the sector has remained at
around 60,000. Temporary workers from other countries used in the
construction sector are not fully reflected in the official statistics. In
addition to temporary workers, an increase in productivity can also be
expected on the account of achievement of economies of scale from
larger projects.
Hõivatute arv (töötajat) Ehitustegevus, mld €
70 000 3,5
60 000 3,0
50 000 2,5
Ehitustegevus, miljard €
Hõivatute arv
40 000 2,0
30 000 1,5
20 000 1,0
10 000 0,5
0 0,0
2010 2011 2012 2013 2014 2015 2016 2017 2018
Figure 42. Construction activity and number of workers employed in the construction sector.
Hõivatute arv (töötajat) Number of employed (workers)
Ehitustegevus, mld € Construction activity, B €
Hõivatute arv Number of employed
Ehitustegevus, miljard € Construction activity, B €
67
Construction activity develops inertly in the general economic
environment, i.e. people build more if the economy is generally doing
well and less when it is not. Considering that construction hit the lowest
point in 2010 and peaked in 2019, the 2015 building construction
volume of €1.3 B could be regarded as the average. Full renovations
account for approximately €200 M of this. Provided that 17 jobs are
created for every €1 M investment37, the number of workers employed
in full renovation is around 3,400. Full renovation of all unrenovated
buildings would require an investment of up to a billion euros per year,
which in turn requires around 17,000 workers to be employed in full
renovation.
Workers added to those engaged in full renovation do not constitute
all of the extra workers needed in the construction sector. Workers
who have been engaged in constructing new buildings would be
redistributed in the sector to renovate buildings. The prioritisation of
renovation must therefore also be taken into account in construction
decisions. The purpose of the gradual increase of the renovation
volumes presented in the strategy is to shape the market without
overheating it, incl. by avoiding a disproportionate increase of
construction prices. The need for workers can be covered by an
increase in productivity arising from the adoption of new technologies.
9.2 Impact of building renovation
Renovation of buildings is a regional and social measure that has a long-
term effect on shaping the living environment. In addition to a direct
reduction of energy consumption, other important factors must be
taken into account when renovating buildings.
Energy poverty is not currently a widespread problem in Estonia.
According to the European Energy Poverty Observatory data38, 2.9% of
households reported problems with heating their homes and 6.3% of
households had energy bill debts. When planning full renovation of
existing buildings, it must be remembered that some households are
not capable of carrying out renovation. Renovation of a building
requires the owner to make a financial contribution even if there are
support measures available and households with lower incomes are
not able to provide that. Vulnerable households need additional
support for participating in energy saving measures.
The ways of ensuring accessibility in buildings are currently very
different. Users of buildings change and therefore it must be ensured
during renovation that the building can be used by all population
groups (parents with prams, children, elderly and disabled people). In
order to ensure the accessibility of public spaces and buildings to all
37
Pikas, E.; Kurnitski, J.; Liias, R.; Thalfeldt, M. (2015). Quantification of economic benefits of renovation of
apartment buildings as a basis for cost optimal 2030 energy efficiency strategies.
38
Bouzarovski, S. & Thomson, H. (2019) Transforming Energy Poverty Policies in the European Union: Second
Annual Report of the European Union Energy Poverty Observatory.
68
people and increase accessibility awareness, the Government Office
has set up the Accessibility Task Force39.
In the case of towns with a shrinking population, there is a need to
take into account the population and infrastructure development
principles in zoning and for concentrating the town centres. According
to a doctoral thesis defended in the Tallinn University of Technology in
201940, shrinking local governments should above all focus on the
quality of life of their residents and attractiveness of urban space is
important for achieving this goal. In urban areas where the population
is getting older or smaller, it is therefore important to not only demolish
underused buildings but also to ensure full functionality of the urban
space, using demolition as an opportunity to improve the availability of
public services and the functions needed for the functioning of urban
areas, by gathering these into synergistic spatial ecosystems.
Moreover, abandoned and underused buildings affect the lives of
people living nearby, as they have a strong negative symbolic value.
Therefore, in shrinking towns, buildings should above all be renovated
in the town centre (defined with zoning) and sustainable residential
areas planned in the zoning.
Renovation of buildings plays an important role in designing good
public spaces. By approaching each building individually without
considering the whole picture, renovated buildings located in the same
area will end up looking like an architectural patchwork. Therefore, in
order to ensure a regional architectural whole and develop a good
public space, it is necessary to follow the basic principles for high-
quality space41, zoning plans of local governments and architectural
guidelines for renovating buildings in different regions.
Broader use of local renewable energy along with renovation of
buildings. The best technical solution for densely populated areas is
the installation of solar panels for producing electricity. The electricity
consumption of buildings previously without ventilation systems that
are fitted with mechanical heat recovery ventilation systems will
increase as a result of the renovation. The increase in electricity
consumption due to ventilation systems can be set off by producing
electricity locally using solar panels. The CO2 emissions of private
houses where stove heating is replaced with a heat pump will also
increase as a result of the renovation, because previously emission-free
woodfuel is replaced by specific emission-intensive electricity. The
increase in electricity use can be set off by installing solar panels.
Renovation allows buildings to be brought in line with contemporary
safety requirements in order to ensure safety of buildings. The post-
design life cycle of a majority of buildings has either ended or coming
39
Accessibility Task Force https://www.riigikantselei.ee/et/ligipaasetavuse-rakkeruhm
40
Jiří Tintěra, 2019. Urban Regeneration Strategies for Shrinking Post-Soviet European Communities: A Case
Study of Valga, Estonia.
41
Kvaliteetse ruumi aluspõhimõtted [Basic principles for high-quality space]:
https://www.kul.ee/sites/kulminn/files/lisa_3_-_kvaliteetne_ruum_aluspohimotted.pdf
69
to an end, which has created an immediate need to repair their load-
bearing structures (such as balconies and shelters). According to a
survey conducted by the Technical Regulatory Authority in 2012 and
201342, 53% of the balconies of the 26 surveyed buildings showed
severe structural deficiencies. Only 16% of balconies met all of the
requirements. In addition to structures, the electrical systems and
water and sanitation piping of buildings require safety upgrades.
When renovating buildings, attention must also be paid to the fire
safety of the building (fire doors, building services system penetrations,
gas equipment safety, shutdown of installed ventilation systems in the
event of a fire, etc.). Work required to ensure the safety of the building
must be considered eligible in support measures. For instance,
installation of fire doors, replacement of indoor air-dependent gas
water heaters with a centralised hot water supply system and
automation required for ensuring fire safety.
In the case of national renovation support measures, areas located
outside of the Tallinn region should be prioritised in order to ensure
regional balance. If support measures are distributed on similar market
conditions, they are concentrated in more capable areas, which
exacerbates the uneven development of regions. The Estonian regional
economy scenarios prepared by the Foresight Centre43 point out that
for the regional economy to function, changes are also required in
regional living environments – renovation and upgrading of buildings
and availability of high-quality office spaces. In addition to giving an
advantage to regions outside the capital in support measures, extra
measures, such as state guarantees for home loans and renovation
loans outside larger cities and greater inclusion of the local government
level in measures supporting renovation of buildings, should be taken.
In urban areas where the population is getting older or smaller, it is
important to ensure full functionality of the urban space, using
renovation and demolition as an opportunity to improve the availability
of public services and the functions needed for the functioning of urban
areas, by gathering these into synergistic spatial ecosystems where
possible.
Renovation of buildings also has a considerable impact on the energy
sector. The use and import of fossil fuels and sales volumes of district
heating companies will diminish. The need to invest in new energy
production capacities will reduce. Buildings requiring less energy also
allow for harnessing the potential of renewable energy solutions and
distributed energy and an increase in energy independence and the
security of the energy supply.
42
Technical Regulatory Authority. 1960-1990 ehitatud korterelamute rõdude ja lodžade raudbetoonist
eenduvate esipiirdepaneelide uuring [A Study of Reinforced Concrete Front Panels of Balconies and Loggias of
Apartment Buildings Built between 1960-1990]. 2013
43
Foresight Centre (2019). Eesti regionaalse majanduse stsenaariumid 2035 [Estonian Regional Economy
Scenarios 2035]. https://www.riigikogu.ee/wpcms/wp-content/uploads/2019/02/Eesti-regionaalse-
majanduse-stsenaariumid-2035.pdf
70
71
10.1 Adoption of new technological solutions
10 Measures
In order to increase renovation volume, technological solutions need
to be developed. This must be done in terms of both construction work
and preparatory work. Provided that the volume of new buildings will
remain on the same level, technologies that are currently used make it
very difficult to achieve around a fivefold increase in renovation
volume. There is not enough labour to cover a rapid increase in
volumes. Renovation capacity increases in periods when the volume of
new construction temporarily decreases, but the labour challenge will
re-emerge once the volume of new construction is restored. Labour
shortage also occurs in the preparatory stage of renovation (energy
auditors, designers, owner’s consultants, etc.).
In addition to solving the labour problem, new technological solutions
also allow to speed up processes and reduce the increase in the cost of
construction arising from increased demand (see also 7.2 “Financing
needs”). For instance, use of prefabrication allows for the achievement
of economies of scale when renovating standard buildings and speeds
up the renovation process. A quicker process allows more buildings to
be renovated with the same amount of labour, and another important
positive social impact is that in the case of residential buildings,
buildings are not covered with scaffolding and netting for a long period
of time.
Use of prefabricated external wall and roof elements to insulate the
building envelope. Prefabrication could first be used for renovating
standard buildings (e.g. apartment buildings). In larger cities, such as
Tallinn and Tartu, there are many apartment buildings that were
constructed in the Soviet era by residential construction combines on
the basis of standard designs. For instance, the Tallinn Residential
Construction Combine standard reinforced concrete panel apartment
building designs 1-464 (Mustamäe) and 111-121 (Õismäe and
Lasnamäe) or Tartu Residential Construction Combine standard design
111-133 (Annelinn and county centres). Standard design 1-317 (so-
called Khrushchyovka) built from bricks or concrete panels is also
common. Apartment buildings prefabricated on the basis of standard
projects could also be renovated using solutions prefabricated on the
basis of standard solutions. Use of prefabrication would allow the
renovation process to be automated and accelerated and ensure better
quality.
Digital tools for preparing energy labels and energy audits.
Development of virtual tools could be the next step in the digitalisation
of the field. Use of virtual tools would help to reduce the time spent on
preparing energy labels and energy audits and therefore also the costs.
For instance, the tools in the Building Registry which automatically
prepare documents or make calculations simpler (calculating the
heating costs for a normal year, energy costs per square metre, etc.)
would allow not only energy labels but also energy audits to be
standardised. The added value would be the possibility to analyse the
data of the labels prepared and audits performed. Current energy
72
labels and energy audits are generally presented as documents in PDF
format, which are not machine-readable and cannot therefore be easily
used for analysis. In the environment, which is part of the Building
Registry, audits could be linked to the data of the Building Registry and
the energy use data entered in the audit would be automatically usable
by the system for analysing the bigger picture of the energy use of
buildings.
Simplified digital tools for building owners. The most important
condition for renovating a building is the owner’s will to renovate.
Simpler virtual tools would enable building owners to think through the
initial versions themselves without incurring any costs.
For example, a tool for private house owners that is based on technical
solutions, where the user can enter the parameters of an existing
building (wall type, window type, heating system, ventilation system)
and choose between different options for improving energy
performance (thickness of the external wall and roof insulation, new
triple-glazed windows, replacement of the heating system and
installation of a ventilation system and solar panels).
An energy performance assessment tool that is based on energy costs
could be developed for owners of commercial properties. Owners of
commercial properties are not generally aware of the building’s energy
consumption in units like kWh or kWh/(m2y). The energy costs in euros
are known. A building’s energy consumption could be assessed on the
basis of energy bills provided by the accountant and the cost of the
energy unit. It would also be possible to offer general suggestions for
reducing energy costs on the basis of the building’s general technical
specification and the main energy cost component (electricity or
heating) determined on the basis of energy bills.
10.2 Research and development
Research and Development allows the quality to be improved and the
processing of data collected about buildings to be automated, the
problem of labour shortages to be alleviated, productivity to be
increased and the total cost of renovation to be reduced.
Development of state registries improves the monitoring of
renovation activities. The main bottleneck of preparing the renovation
strategy was the lack of data. For instance, the Building Registry should
allow data to be processed in order to answer the following questions:
What is the share of full renovations in renovations completed?
Which of the buildings to be renovated are owned by local
governments and the central government?
Which of the buildings in the Building Registry are protected
under heritage conservation or of cultural or environmental
value?
73
Mapping of decision-making processes provides the opportunity to
understand why and when property owners decide to start renovation
work. Support measures have provided a certain insight of the owner’s
perspective in terms of apartment buildings and public sector buildings.
The processes of renovating private houses and commercial properties
have not yet been thoroughly mapped. It is impossible to successfully
guide renovation processes without knowing why and on what
conditions property owners decide to start renovation work.
Development of strategic spatial planning allows to apply the basic
principles for high-quality space44 when renovating buildings. There is
a need to develop general architectural guidance materials for
renovating different types of buildings and local government guidance
materials for renovating buildings in certain regions.
Analysis of the broader impact of renovation of buildings . The
economic impact of building renovation measures, the impact of global
warming on potential energy savings of buildings, the impact of
building renovation on the achievement of climate neutrality, the
options for broad-based implementation of innovative solutions, the
results of pilot projects conducted in other countries and the potential
to transfer international practices should be analysed in detail. The
impact of global warming requires an analysis in terms of renovation
solutions and the longevity of materials used. Solutions can be found
to reduce changing climate burdens and risks and avoid a new
renovation wave arising from insufficient weatherproofing in the
future. New technical expertise that is obtained as a result of
development activity must be implemented both internally in the
construction sector and on a cross-sectoral basis (property
management, insurance, urban planning, etc.), which requires, among
other things, training of specialists and guidance materials.
Development of technical expertise allows to renovate with
sustainable, healthy and real energy savings, which do not come at the
expense of the interior climate. Having guidance materials and
expertise allows designers and construction workers to know what is
expected from them and contractors to develop economical and
affordable standard solutions. To date, more than 10 doctoral theses
have been defended on the topic of renovation of buildings and the
results are well-implemented.
Good results have already been achieved in the case of apartment
buildings and public sector buildings. The situation of private houses is
the most complicated because the structures of older buildings may
pose difficulties due to moisture and mould, but there is essentially no
technical literature on renovation of small residential buildings.
Renovation of commercial properties has also mostly involved
individual energy saving works, which is why there is a lack of general
experience of full renovation. The practice of improving the energy
44
Kvaliteetse ruumi aluspõhimõtted [Basic principles for high-quality space]:
https://www.kul.ee/sites/kulminn/files/lisa_3_-_kvaliteetne_ruum_aluspohimotted.pdf
74
performance of buildings that have cultural or environmental value or
are acknowledged as architectural monuments also requires the
development of expertise because the requirements for renovating
valuable buildings are more detailed and achieving energy class C is not
often possible or even reasonable.
Increasing renovation volume creates a new challenge on the market
in the form of labour shortage. This creates a need for development
work that would allow more renovation using the existing workforce,
i.e. to improve productivity. Currently, the only known way to
significantly improve productivity is to transfer as much of the on-site
work as possible to factories and start renovating using pre-fabricated
components which are assembled on site.
The following research, development and innovation activities are
required to increase technical expertise:
Development of technical solutions and guidance materials for
renovating small residential buildings. Taking into account the
market situation, both renovation by individual work and full
renovation must be enabled because both are conducted
depending on the situation and needs of families.
Cost-effective solutions for significant renovation of commercial
properties. Currently, office or commercial buildings are not
generally renovated to correspond to energy class C. There is a
need to monitor the energy use of existing buildings and develop
and test solutions that ensure real energy savings with a reasonable
investment.
Renovation using prefabricated components. In order to alleviate
the labour shortage resulting from an increase in renovation
volumes, there is a need to increase productivity and, in the long
term, cost-efficiency. Industrial production in its simplest form is
made possible by lightweight external wall and roof elements,
which include the necessary building services system piping. Such
solutions currently exist on larger markets where labour is more
expensive.
Reduction of CO2 emissions achieved by the measures of the
strategy and comparative analysis of measures in terms of emission
reduction efficiency, i.e. marginal cost. The current analyses have
been based on final energy consumption and the energy
performance indicator (primary energy), but in the future, there is
a need to determine the exact impact on emissions in the context
of climate neutrality.
10.3 Awareness raising
In order to boost renovation of private houses, guidance materials on
renovation aimed at owners of private houses must be developed.
There are currently no comprehensive Estonian handbooks on
renovating private houses. Guidance materials should be freely
75
available on the internet. The same internet address should also
include information on possible support measures and web-based
energy performance calculators aimed at owners of private houses.
Renovation of apartment buildings requires working with apartment
associations that have not participated in existing renovation
measures. According to apartment building support statistics, support
is mainly applied for buildings with 30-40 apartments that are mostly
located in centres. Smaller apartment buildings and those located
outside of centres must also be included in the planning of further
renovation measures. Apartment buildings that do not have a
functioning apartment association also require attention in terms of
raising awareness. Apartment associations were created automatically
for apartment buildings that did not have an apartment association as
at 1 January 2018. The estimated number of automatically created
apartment associations is around 10,000.
Supporting the performance of energy audits would help to raise
awareness among owners of private sector commercial properties.
The purpose of this is to increase the awareness of commercial
property owners of the energy consumption of buildings under their
management and the possible energy savings and related benefits. A
detailed energy audit would provide the property owner an overview
of the possibilities of reducing energy costs, the work schedule, the
costs and later changes in energy costs. Support could be applied for
energy audits that have been used to carry out energy saving work. As
an added value of the measure, a dataset on the energy use of non-
residential buildings, the measures applied and the cost of measures
would be created. Publishing of the dataset (in a format that does not
allow specific buildings to be identified) would give owners and tenants
the opportunity to compare the energy performance of their building
with that of other buildings.
The audit must include the cost and feasibility of the measures, i.e.
feasibility by stages. Additionally, the audit must specify the measures
for later surveillance, monitoring and certification. If there is a wish to
use the audit as a source document for investment support, economic
calculations that take into account the partially related costs associated
with renovation work must also be made together with the audit.
10.4 Demolition of buildings falling out of use
According to forecasts, up to around 5,000 apartment buildings and up
to 10,000 non-residential buildings will fall into disuse by 2050.
Demolition of disused buildings is mainly impeded by the resolution of
ownership issues. In the case of apartment buildings, it is also hindered
by the last residents of half-empty buildings moving to renovated
buildings. In urban areas where the population is getting older or
smaller, it is important to not only demolish underused buildings but
also to ensure full functionality of the urban space. As a result,
demolition can be used as an opportunity to centralise public services
76
and functions required for the functioning of urban areas and improve
their availability.
10.5 Financing measures
Financing measures include loans, guarantees and support.
In order to facilitate renovation of private houses, it is important to
address the market failure resulting from low property value. To
finance renovation with a loan in regions where property values are
lower, it must be possible to use state guarantees that are valid until
the state loan agreement maturity date, which would allow banks to
issue loans independent of the value of the collateral and against a
state guarantee.
In order to increase the private house renovation activity, the support
measure for private houses must be continued in order to address the
market failure due to low financing capacity and target technical
solutions used in renovation. The support rates of the support measure
should be differentiated in accordance with the comprehensiveness of
the planned renovation. A greater support rate for full renovation and
a smaller support rate for individual works.
The focus of apartment building renovation must differ by region. Full
renovation must above all be targeted at the centres of functional
regions and second-tier centres. The measures for apartment buildings
that are located in the immediate hinterland of cities and the periphery
would depend on the capacity of apartment associations. Loans and
support are either used for more comprehensive renovation of building
envelopes and building services systems or renovation by individual
works. In the case of apartment buildings that are in a more
complicated situation (very low property value, partially emptied, the
apartment association’s capability to conduct renovation processes is
very low), it should be able to renovate by individual work with the
purpose of ensuring safe use (e.g. replacement of the old electrical or
heating system) or preservation (e.g. replacement of a leaking roof) of
buildings. Apartment associations that are located outside of centres
may require a state-funded loan measure for carrying out renovation
work. Loans would be available to apartment associations to whom
commercial banks are not ready to grant renovation loans in the
required amount.
One possibility to facilitate renovation of private sector commercial
properties is renovation support that is based on the CO2 emissions
arising from the building’s energy use. The support is based on the
energy savings achieved as a result of renovation and the related CO2
emission reduction. Upon supporting investments it is also considered
that the CO2 equivalent of coolants used in the equipment to be
installed (refrigerators, heat pumps) is as small as possible. The support
amount can be up to 50% of the total investment. The principle of the
measure is that the reduction of CO2 emissions resulting from the
investment should be as big as possible. The more efficient the
77
measures, the larger the support. Support for achieving a 30%
reduction of CO2 emissions is smaller than the support for achieving a
50% reduction of CO2 emissions.
Support, loans or guarantees are applied on the basis of the energy
audit of the building, which includes the following information:
the list of measures required to reduce the energy cost
together with a detailed description of application thereof;
a financial plan that takes into account all potential related
costs;
changes in the building’s energy costs by measures and later
total energy cost;
CO2 emissions reduced;
a plan for monitoring changes in energy use and the method of
proof.
The payback period of the whole investment for property owners must
be less than 30 years (life cycle of building services systems), but a large
part of the market considers renovation only if the payback period is
less than 10 years. In addition to the payback period, the size of the
building must be taken into account. In the case of the current
measure, the proportion of the support (e.g. 30%, 40% or 50%) would
not only depend on the amount of reduced CO2 emissions, but also the
size of the building. The smaller the building, the more expensive its
renovation per square metre. Energy saving work should be carried out
in full and a part of the support (e.g. 15%) paid out after a one-year
monitoring period, when it is proved that the established energy saving
goal was achieved.
The example of the calculation of a CO2 emission reduction-based
support measure is provided in Annex 11.1.
The support measures for renovation of public sector buildings are not
built on a certain proportion of support, but on supporting energy
saving work performed during renovation. The analysis of budgets of
fully renovated public sector buildings showed that around 50% of the
renovation cost is related to energy saving work. The rest of the work
is related to changing the functionality, spatial planning and interior
finishing of the building, etc.
Processes for renovating public sector buildings have been established.
Provided that there is funding, the renovation volume of public sector
buildings can be quickly increased by completing a prior analysis of its
broader effects, incl. market capability, impact on the materials
industry, jobs, etc. In the case of a rapid increase in the renovation
volume of local government buildings, the process may be hindered by
the local government’s creditworthiness. Less capable local
governments are allowed to take a loan of up to 60% of the costs of the
main activity. More capable local governments are allowed to take a
loan of up to 100% of the costs of the main activity. According to the
78
Ministry of Finance, in 2018, the average net debt burden of local
governments was 28%45. Thus, upon the existence of support
measures, many local governments would have the financial capacity
to increase the volume of full renovation of local government buildings.
10.6 Creating additional services for residential building
investments
One possible measure is making investments via the KredEx
Foundation, so as to involve private partners as financers while
minimising the burden on the state budget. To this end, there is a need
to create capacity in the form of services that follow market-based
rules, the main purpose of which is to facilitate renovation of
apartment buildings, increase the number of rental houses and reduce
the fluctuation of construction market volumes in time (counter-
cyclical measure). According to one possible scenario, for all the needs
pointed out in this strategy to be covered, the following estimated
prerequisites should be met:
The annual financing needs will be around €220 M in the first
years. The state should cover around one-tenth of the
amount.
The total financing need until 2050 for renovating apartment
buildings and constructing new buildings would be 7.9 billion
euros. The financing needs may change depending on the
adoption of new technologies, the market’s adjustment to
increased renovation volumes, etc.
The state will get back around 30% of the construction costs
as taxes, i.e. the related tax revenue would be 70-170 M euros
a year.
In the case of apartment building renovation, these services could be
used to offer loans, guarantees and counselling services in combination
with existing measures applied by KredEx Foundation. Guarantees and
guarantees in combination with long-term loans could be offered as
financial measures. Upon applying a 3% interest rate, the annual loan
payment would reduce by about a quarter in the case of annuity
payments if the term of the loan is extended from 20 years to 30 years.
Thus, a longer loan term would be comparable to offering financial
support, even though it would not reduce the total cost (interest
payments would ultimately be even larger).
All of the required preparatory work – mapping of the apartment
association’s wishes, offering solutions and organising the designing
and construction process – can also be treated as a support measure.
The organisational side is a significant obstacle to getting started with
renovation.
45
Ministry of Finance. 2019. https://blogi.fin.ee/2019/07/kohalike-omavalitsuste-finantstervis-on-hea/
79
All of the required preparatory work made by the buildings – mapping
of the apartment association’s wishes, offering and promoting
solutions (together with the estimated savings) and organising the
designing and construction process – can also be treated as a support
measure. The organisational side is a significant obstacle to getting
started with renovation. The KredEx Foundation as an external party
and renowned competence provider with references could reach an
agreement with apartment association members more quickly upon
explaining the need for renovation work and possible solutions.
Construction of rental buildings in areas where new apartment
buildings are not built on market terms. Considering the increasing
mobility of people and changes in needs throughout the life cycle,
renting allows for a greater flexibility in choices. Increasing the offering
of rental houses with the help of KredEx Foundation’s new services is
also important for smoothing construction market fluctuations. While
demand can be increased to a certain degree by renovating apartment
buildings, in difficult times, it is more easier to support the construction
volumes by building rental houses. Renovation of apartment buildings
may be more cost-effective during a market slump (work costs less),
but the readiness of apartment association members to commence
with work may be hampered by the uncertainty of their financial
situation and income.
80
11 Annexes 11.1 CO2 emission reduction-based support measure for
renovating commercial properties
In the example, calculation of a CO2 emission reduction-based support
measure is provided for office, commercial and service buildings. The
calculation example is prepared on the basis of the average indicators
for the energy use and renovation costs of buildings. Basic data for
calculation:
Electricity cost €100/MWh, heating cost €60/MWh
Electricity has a specific emission factor of 0.83 t CO2/MWh and
heating 0.12 tCO2/MWh.
The calculations proceed from the assumption that energy class C is
achieved as a result of renovation.
Table 28. Changes in the energy use, CO2 emissions and energy costs of office, commercial and service buildings.
Office Before renovation Reduction after renovation
Building area, Heating, Electricity, CO2, Energy Heating, Electricity, CO2, Energy
m2 kWh/(m2y) kWh/(m2y) t/y cost, €/y % % t/y cost, €/y
1,000 140 80 83 16,400 50% 44% 46 7,700
3,000 130 70 221 44,400 46% 36% 137 18,300
5,000 110 70 357 68,000 36% 36% 229 24,500
Commerce
Before renovation Reduction after renovation
and services
Building area, Heating, Electricity, CO2, Energy Heating, Electricity, CO2, Energy
m2 kWh/(m2y) kWh/(m2y) t/y cost, €/y % % t/y cost, €/y
1,000 80 140 126 18,800 31% 39% 77 7,000
3,000 80 140 377 56,400 31% 39% 231 21,000
5,000 80 140 629 94,000 31% 39% 386 35,000
The question of return on investment is important to property owners.
The proportion of the support should ensure a payback period of more
than 20 years.
Table 29. Investments required for renovating office, commercial and service buildings and payback period.
Office Investment Ordinary payback period
Building area, Investment, Investment, Investment for Without Support, Support, Support,
m2 €/m2 € reducing CO2, €/t support 30% 40% 50%
CO2
1,000 400 400,000 8,700 52 36 31 26
3,000 300 900,000 6,600 49 34 30 25
5,000 250 1,250,000 5,500 51 36 31 26
Commerce
Investment Ordinary payback period
and services
Building area, Investment, Investment, Investment for Without Support, Support, Support,
m2 €/m2 € reducing CO2, €/t support 30% 40% 50%
CO2
1,000 400 400,000 5,200 57 40 34 29
3,000 300 900,000 3,900 43 30 26 21
5,000 250 1,250,000 3,200 36 25 21 18
In the case of the renovation options given in the example, the support
for an investment made in order to reduce one tonne of CO2 emissions
81
could be between €1,000-2,600 at a support rate of 30%, €1,300-3,500
at a support rate of 40% and €1,600-4,400 at a support rate of 50%.
82
11.2 Measures related to renovation of existing buildings
This chapter provides an overview of measures related to buildings that
underwent renovation in 2019. The measures are presented by
institutions carrying out the measures.
Environmental Investment Centre
Replacement of an apartment building’s heating unit that runs
on biomass or fossil fuel or a heating unit that partially uses
electrical heating with a heating unit that uses renewable fuel
or connecting an apartment building with the district heating
network.
Installation of local heating to replace the district heating
system of an existing building and demolishing the parts of the
district heating system that falls into disuse as a result thereof.
SA KredEx
Housing loan guarantee for purchasing a new home or
renovating an existing one.
Renovation support for small houses for improving their
energy performance.
Home support for families with many children, who can use
the support to purchase, construct, expand or renovate their
home.
Loan guarantee for apartment associations for financing
renovation-related work.
Renovation support for conducting full renovation.
Electrical system renovation support for buildings in Tallinn
that use the old voltage system with the purpose of changing
the buildings over to the new voltage system.
Solar panel investment support for apartment associations,
companies and local governments.
Demolition support for local governments for demolishing
residential buildings and non-residential buildings that have
fallen into disuse.
State Shared Service Centre
Support for improving the energy performance of central-
government buildings in order to renovate an existing building
or building a new building to replace an existing one.
Support for making local government buildings energy
efficient.
83
11.3 Results of interviews conducted among owners of
private sector non-residential buildings
In the course of preparing the strategy, interviews were conducted with
six representatives of companies owning and developing commercial
properties and representatives of the Estonian Association of
Construction Entrepreneurs. The purpose of the interviews was to
determine the conditions on which owners of commercial properties
decide to invest in energy savings-related renovation.
The functioning logic of the commercial property market is not
conducive to full renovations, because the tenant covers the main
costs, of which only a fraction are energy costs. Conscious tenants are
more interested in interior climate rather than energy performance.
There are also investors who keep buildings in their portfolio for a short
period of time. As there is no intention of using the building for the
long-term, the investor does not deem it necessary to invest in
improving the building’s condition.
It is known that buildings age in 30 years and property owners are
forced to upgrade their buildings in order to stay on the market. The
question is, in what extent will renovation work be undertaken? Larger
projects with a payback period of over 20 years are not attractive to
owners, because by then the building services systems installed will
need to be replaced again. The investment payback period should be
less than 10 years.
As the return on investments made is important in the case of
renovations, property owners have to be informed and require specific
and realistic savings in order to make decisions. Assessments on the
possibilities of saving energy and full renovation plans prepared by
specialists would help to achieve this.
In the case of commercial properties that are located outside of
centres, tenants do not have much of a choice in terms of rental spaces
and do not therefore have any particular demands in relation thereto.
Additionally, areas outside centres lack energy performance-related
awareness and the capability to carry out full renovation projects.
The main problems commercial property owners face when renovating
are as follows:
• long investment payback period;
• investment is made by the property owner, while the tenant
benefits;
• the reduction in energy costs achieved as a result of renovation
may not be attractive to tenants;
• energy performance requirements are changing too fast.
Requirements that are constantly amended and changes in
calculation methodology (e.g. changes in weighting factors)
make preparing a long-term view more difficult. Future energy
performance requirements for buildings are unknown.
84
• Full renovation requires temporary closure of the building,
which reduces the property owner’s rental income.
• The construction company carrying out the construction or
renovation work is not interested in future use of the building
and its operating costs.
Solutions proposed by owners of commercial properties:
• Planned changes in building energy performance requirements
must be announced as early as possible. Property owners
would like to know the changes to be introduced in the building
energy performance regulations and the implementation time
of the new requirements at least 10-20 years in advance.
• The energy class boundaries must be stable. A system where
energy class boundaries change every five years is too unstable
to base investment decisions on. A building energy
performance assessment system that is more stable and easier
for the public to understand.
• In the case of energy savings support, a requirement to prove
the achievement of the energy savings goal must be added to
the support measure. For instance, achievement of the goal
must be proved a year after the completion of the renovation
work.
• Carrying out commercial property renovation pilot projects to
demonstrate best practices.
• More attention should be paid on IT solutions of buildings:
automation, remote management, troubleshooting,
monitoring of use profiles and building services system
monitoring.
• Energy audits should be more detailed and renovation work
proposed therein should consider the feasibility and additional
costs of the work.
• Preparation of an energy consumption survey of the
commercial property sector. For instance, preparing an
additional query to property owners about the energy
consumption of properties owned by them. This can be used to
obtain an overview of existing buildings.
85
11.4 Public consultation and inclusion of stakeholders in the
preparation of the strategy
In order to include and inform stakeholders, two workshops were
organised in the rooms of and at the invitation of the Ministry of
Economic Affairs and Communications. The first workshop on 10
December 2019 focused on the condition of residential buildings and
possible measures. 44 people from 23 organisations participated in the
workshop, which indicates a great interest in renovating apartment
buildings and small residential buildings.
The second workshop on 19 February 2020 addressed market-based
renovation of non-residential buildings, market failures and possible
measures. 26 people from 22 organisations participated in the
workshop.
The workshops provided important feedback and also proposals. The
most important of these are:
• reflecting the need to develop new buildings outside Tallinn,
Tartu and Pärnu in order to set off the buildings that fall into
disuse and are likely demolished in the strategy;
• imposition of energy class C requirement on all spaces used by
the public sector;
• considering factors other than energy savings when renovating
buildings (building accessibility, building safety, the shrinking
of cities).
Five steering group meetings were held when preparing the strategy:
on 26 September 2019, 21 October 2019, 13 November 2019 and 19
February 2020. The steering group involved the representatives of the
Ministry of Economic Affairs and Communications, the Ministry of
Finance, the Ministry of the Environment, KredEx Foundation, State
Real Estate Company Riigi Kinnisvara AS, the Estonian Environmental
Research Centre and Tallinn University of Technology.
The strategy was introduced to a wider audience at the Ehituse Treff
2019 event on 5 December 2019 (110 participants) and the round table
on housing on 29 January 2020 (80 participants).
86
11.5 Methodology for estimating residential building
volumes.
In the next few decades, renovation needs will be shaped by
demographics and migration. It is not practical to renovate buildings in
areas that are shrinking and where buildings will fall into disuse in the
future. According to the population projections of Statistics Estonia, the
Estonian population is decreasing (statistics tables RV086, RV088
2019).
The renovation volume of buildings that fall into disuse is estimated on
the basis of the basic population projection scenario (RV086), which
Statistics Estonia considers the most likely. More positive and negative
scenarios have not been used in calculations of building abandonment
rates, because 1) these are less likely and 2) Statistics Estonia has not
prepared a population projection by county for these scenarios.
Migration, which follows global trends, is much more important than
population dynamics in the context of buildings falling into disuse. The
main trend is the continuation and acceleration of the urbanisation
process. This means that the periphery empties and larger centres grow
on the account of rest of the areas. This in turn increases the housing
need in centres and contributes to the emptying of residential buildings
in other areas. In Estonia, urbanisation is mainly expressed in the
movement of people to larger centres with well-paid jobs. These
centres are the urban areas in mainly Harju County and, to a smaller
extent, Tartu County. Population is in decline in other regions. The
population projections of Statistics Estonia take migration into account.
Thus, if a more positive demographic scenario becomes a reality, the
population grows and the share of external migration increases, it is
still of marginal importance compared to the impact of urbanisation.
Considering 1) the research volume, 2) availability of existing data and
3) the need for the strategy to be precise, the volume of buildings was
projected using the distribution of functional regions by Statistics
Estonia as the regional population density system model (Statistics
Estonia 2014). The distribution of functional regions is based on
commuting data, which characterises the link between population
distribution and destinations that are mainly related to work and study.
Estonia is divided into functional regions with one centre. This mainly
87
coincides with the county centre, but in several counties additional
centres have occurred as a result of migration. All of the hinterlands of
the centres of functional regions are divided into three zones:
immediate hinterland, transition zone and periphery. The zones of a
functional region correlate well with other regional development
indicators, such as the transaction value of apartment buildings, which
is why it is appropriate to use the functional region model in the
renovation strategy.
In addition to centres of functional regions, the analysis also discerns
second-tier centres and other urban areas in accordance with the 2019
small settlements study.
Data, prerequisites and methods
1. Data related to residential buildings originate from the Building
Registry; KredEx Foundation renovation database; the public
database of 2000 and 2011 population and housing census; the
transaction value register of the Land Board; the database of
2019 small settlements study; public databases of Statistics
Estonia.
2. The population projection by counties prepared by Statistics
Estonia until 2045 is, within the context of the study, linearly
extended by five years to bring it in line with the target deadline
of 2050 of the renovation strategy.
3. When estimating the housing abandonment rate it is presumed
that upon shrinking of regions, residential buildings fall into
disuse on the basis of the following regional hierarchy: the
periphery of functional regions will empty first, followed by
transitional areas. In some regions (e.g. Ida-Viru County and
Valga County), where there are fewer residential buildings
outside centres, but the population projection indicates a
decrease, residential buildings fall into disuse also in centres.
4. The ratio of residents of apartment buildings and small
residential buildings is determined by urban areas using public
statistics from Statistics Estonia. Even though the population
and housing census enables the distribution of residents of
each building to be determined on the basis of the building
type, such an approach was not practical considering the
volume of the analysis and the need for the strategy to be
precise.
5. Upon analysing the abandonment rate of residential buildings,
it is presumed that most of the impact of the decrease in
population is expressed in the emptying of apartment
buildings. Small residential buildings may also remain in
seasonal use in the periphery. Apartment buildings in sparsely
populated regions, e.g. apartments of former Soviet
agricultural holdings, however, fall into disuse.
88
6. The abandonment rate of residential buildings in functional
regions is determined on the basis of urban areas taking into
account 1) the number of small residential buildings and
apartment buildings and 2) the area per residents.
7. The paper assumes that private houses that are no longer in
permanent use may remain in seasonal use and are not
generally demolished. Demolition is unavoidable in the case of
emptying apartment buildings at least in urban centres.
8. Housing abandonment is not a linear process. It is presumed
that abandonment is likely exponential and cyclical. Housing
abandonment cycles are likely linked to economic cycles, which
have not been forecasted in the current work.
89
LIFE Integrated projects 2020
Climate Action
Stage 1 - Concept Note (CN) forms
1
LIFE Integrated Projects 2020- CNa
LIFE 2020 FOR ADMINISTRATION USE ONLY
LIFE20 IPC/
PROJECT
Project title (max. 120 characters):
PURSUING ESTONIAN NATIONAL CLIMATE AMBITION THROUGH SMART AND
RESILIENT RENOVATION
Project acronym (max. 25 characters):
LIFE IP BUILDEST
The project will be implemented in the following Country(ies) and/or Administrative region(s):
Estonia – all regions (see the map in form CNe)
Expected start date: 01.10.2021 Expected end date: 31.12.2029
PROJECT POLICY AREA
You can only tick one of the following options:
Climate Change Adaptation LIFE Integrated Project: Integrated project
contributing to the implementation of a national, regional or local specific adaptation
strategy or action plan;
Urban Climate Change Mitigation and/or Adaptation LIFE Integrated Project:
Integrated project contributing to the implementation of a urban or community-
based action plan pioneering the transition to a low carbon and/or climate resilient
society
Climate Change Mitigation LIFE Integrated Project: Integrated project
contributing to the implementation of a national, regional or industry-/sector-specific X
greenhouse gas mitigation strategy or low carbon economy roadmap
The project aims at implementing the following action plan/strategy/ roadmap (full copy is provided in
attachment):
ESTONIAN BUILDING’S LONG-TERM RENOVATION STRATEGY (LTRS), which was approved by
the Estonian Government on the 9th of July 2020.
The requirement for EU countries to adopt a long-term renovation strategy is set out in the Energy
Performance of Buildings Directive (2010/31/EU), which was revised in 2018 (2018/844/EU). These
strategies comprise a part of the respective EU countries’ integrated national energy and climate plans
(NECPs). Estonian NECP was approved on the 19th of December 2019.
Annexes:
Annex I – Estonian Long-term renovation strategy (LTRS)
https://ec.europa.eu/energy/sites/ener/files/documents/ee_2020_ltrs_official_translation_en.pdf
Annex II – Figures describing the project (2 pages, A3): Figure II-1. Project pert chart and Figure II-2.
Project network (beneficiaries and stakeholders)
2
LIFE Integrated Projects 2020- CNa
BENEFICIARIES
Name of the coordinating beneficiary (1): Ministry of Economic Affairs and Communications (MKM)
Name of the associated beneficiary (2): Ministry of Finance (RaM)
Name of the associated beneficiary (3): Ministry of Environment (KeM)
Name of the associated beneficiary (4): Foundation KredEx (KredEx)
Name of the associated beneficiary (5): Environmental Investments Centre (KIK)
Name of the associated beneficiary (6): State Real Estate Ltd (RKAS)
Name of the associated beneficiary (7): Tallinn University of Technology (TalTech)
Name of the associated beneficiary (8): Estonian Academy of Arts (EKA)
Name of the associated beneficiary (9): Tallinn City Government (Tallinn)
Name of the associated beneficiary (10): Tartu City Government (Tartu)
Name of the associated beneficiary (11): Rakvere Town Government (Rakvere)
Name of the associated beneficiary (12): Võru Town Government (Võru)
Name of the associated beneficiary (13): The Estonian Union of Co-operative Housing Associations
(EKYL)
Name of the associated beneficiary (14): Centre of Rural Architecture (MARK)
Name of the associated beneficiary (15): Estonian Association of Construction Entrepreneurs
(EEEL)
Name of the associated beneficiary (16): Estonian Circular Economy Industries Association
(ERMEL)
Not a complete list, further beneficiaries are to be added with the full proposal, also the exact roles of
beneficiaries are to be determined during the development of full proposal.
PROJECT BUDGET AND REQUESTED EU FUNDING
Total integrated project budget: 19 200 000 €
Total eligible project budget: 19 200 000 €
EU LIFE financial contribution requested: 11 520 000 € (= 60 % of total eligible budget)
AUTHORISATION TO INFORM NATIONAL CONTACT POINT
The consortium authorises EASME to share with the LIFE National Contact Point the project title and
coordinating beneficiary name:
Yes X No
3
LIFE Integrated Projects 2020- CNb
Coordinating Beneficiary Profile Information
Short Name MKM Beneficiary n° 1
Legal information on the Coordinating Beneficiary
Legal Name Ministry of Economic Affairs and Legal Status
Communications
VAT No EE100113619 X
Public body
Legal Registration No 70003158 Private commercial
Private non- commercial
Registration Date 28.12.1998
Legal address of the Coordinating Beneficiary
Street Name and No Suur-Ameerika tn 1 PO Box
Post Code 10122 Town/City Tallinn
Country Code EE Country Name Estonia
Coordinating Beneficiary contact person information
Function Head of Sustainable Construction
Surname Sergejev First Name Ivan
E-mail address
[email protected]
Department / Service Construction and Housing Department
Street Name and No Suur-Ameerika tn 1 PO Box
Post Code 10122 Town/City Tallinn
Country Estonia
Telephone No (+372) 639 7638 Fax No (+372) 631 3660
Coordinating Beneficiary details
Website https://mkm.ee/en
Brief description of the Coordinating Beneficiary's activities and experience in the area of the
proposal
In Estonia, the overall objective of the Ministry of Economic Affairs and Communications (MKM) is to increase
the competitiveness of Estonian companies and thus the prosperity of people.
In that capacity, MKM is the competent authority responsible for developing and implementing policy
pertaining to construction and housing, energy, economic development, transport, tourism, foreign trade and
foreign financing, European Union and international co-operation, the internal market of the European Union,
the information society and cyber security.
Hence, MKM is the public body responsible for the full implementation of the Estonian Long-term Renovation
Strategy (LTRS) and linking it to the overall Estonian housing, energy, and climate policies.
Within LIFE IP BUILDEST, MKM is responsible for:
• Coordinating the overall process of LIFE IP BUILDEST;
• Establishing partner networks and engaging stakeholders with the goal of implementing both the
LTRS and LIFE IP BUILDEST;
• Integrating actions foreseen in view of implementing LTRS and general housing, construction,
energy, and climate policies;
• Developing policy schemes and measures needed for the LTRS, assessing, and improving relevant
existing regulations, proposing new motivational schemes and driving the needed sectoral capacity
building.
YOU MAY NOT DUPLICATE THIS PAGE
4
LIFE Integrated Projects 2020 - CNd
SUMMARY DESCRIPTION OF THE PROJECT
1. Overall context/background/geographical scope
OVERALL CONTEXT:
HOW ESTONIA’S LTRS AND LIFE IP CONTRIBUTE TO THE EUROPEAN AND ESTONIAN
CLIMATE POLICY
The European Union has set a target to develop a sustainable, competitive, secure, and decarbonised
energy system by 2050, and the built environment has a major role to play in accomplishing this goal.
Majority of the existing European building stock originates from the period of low requirements on energy
performance that followed World War II, and at present almost 75% of buildings are highly inefficient,
consuming about 40% of total energy produced in Europe. 80% of today’s building stock projected to
still be in use in 2050, but presently only about 1% of it is renovated each year. Therefore, existing
buildings have large potential for energy performance improvement, especially in colder regions. As
energy savings are generally proportional to reducing greenhouse gas (GHG) emissions, the Energy
Performance of Buildings Directive (EPBD) requires EU member states to carry out broad renovation
programs of existing buildings by 2050 in order to achieve a carbon neutral economy.
In view of this, as part of the commitments in the European Green Deal, the European Commission is
preparing a ‘Renovation Wave’ for public and private buildings to address the twin challenge of energy
performance and affordability. This initiative will set a vision for the short, medium, and long term to kick-
start and deliver different levels of renovation of the existing building stock, with accompanying financial
instruments and mechanisms. The ‘Renovation Wave is supposed to double the rate of building
renovation in the EU from 1% to at least 2% annually. An integrated approach to building renovation
means boosting energy performance of buildings by applying the ‘energy efficiency first’ principle,
deploying renewables, preparing for climate impacts, deploying urban green and blue infrastructure and
incorporating circular economy, waste treatment and pollution prevention principles. The expected
benefits are broad and include lowering energy bills, alleviating energy poverty, increasing resilience to
climate change, contributing to human health, safety and improved indoor air quality and providing
habitats for biodiversity, as well as boosting the construction sector and, in doing so, supporting small
and medium size entrepreneurs and local jobs.
Considering the labour intensiveness of building renovation and combining repairing the short-term
economic damage induced by the COVID19 crisis with investing in our long-term future, the Renovation
Wave initiative is seen as a major tool for relaunching EU’s post-COVID19 economy. All the money
raised through Next Generation EU will be channelled through EU programmes in the revamped long-
term EU budget. Here the European Green Deal is planned as the EU's recovery strategy, where the
massive renovation wave of buildings will boost economy, bringing local jobs, improving welfare and
better living conditions. Also, the synergies of the renovation wave with the renewable energy projects,
will kick-starting a clean economy in Europe.
In Estonia even faster rates of renovation are required because of bad construction quality and energy
performance of soviet era buildings as well for large renovation debt. Estonia’s LTRS projects that the
renovation rate must increase up to 5 times on average, with certain sectors needing even steeper
improvements e.g. the rate of deep renovation of single-family residences needs to increase 11 times
over the next 30 years (from 70 000 m²/year during 2020 – 2025 to 800 000m²/year during 2040 – 2050);
from) and the renovation rate of private non-residential buildings needs to increase 6 times over the next
20 years (from 140 000 m²/year during 2020 – 2025 to 800 000m²/year during 2035 – 2045), see Figure
3. This signifies an urgent need for raising capacities, providing technical, social, and financial solutions,
and establishing technical competences, to guarantee that the renovation initiative will pursue its main
goal – improvement of climate mitigation and energy performance. Currently, the construction sector is
unable to deliver such rates of renovation, and so a drastic change in renovation technology and
aggressive capacity building measures are needed to achieve our climate mitigation and energy
performance targets.
The Estonian National General Principles of Climate Policy until 2050 postulate that by 2050 Estonia
will be a competitive economy with low GHG emissions, reducing its emissions by 80% compared to the
level of 1990. As the country moves towards this target, emissions will need to be reduced by about
70% by 2030 and by 72% by 2040. In addition, the decarbonization of Estonia’s building stock is stressed
5
in the national Climate Change Adaptation Development Plan until 2030 and in the National
Development Plan of the Energy Sector until 2030. With the complete renovation of buildings, it is
possible to achieve a reduction in final energy consumption of ~7 TWh/yr, including savings of up to
70% (~6.4 TWh/yr) in thermal energy consumption compared to today’s levels and up to 20% (~0.5
TWh/yr) in electricity consumption. The 2020 COVID19 crisis has proven that Estonia is vulnerable,
when it comes to stable and secure supply of energy. The dependency on importing energy from the
neighbouring countries, especially when dissociating from the use of oil shale, is a severe risk for
Estonia’s energy security. The improvement of energy performance of buildings reduces energy
consumption, thus mitigating the risks related to energy security.
It has been confirmed that investment in renovation of buildings is not only environmentally important
but provides economic benefits on an individual and government budget level. For example, in Estonia
1 M€ of annual investment in renovation generated 17 jobs per year and direct tax revenue was between
32-33%, depending on the renovation project.
Renovation also holds other benefits. For example, upgrading the built environment with the natural
environment in mind e.g. through the use of NBS-s (passive cooling, improving natural water
circulations) and accounting for biodiversity (incl. Natura 2000 birds and habitats directive species, e.g.
bat species) establishes synergies with EU’s Biodiversity Strategy.
To achieve Estonia’s climate mitigation targets, the Nationwide report for reaching climate neutrality in
Estonia [1] suggests focusing first on the “low-hanging fruit” in key sectors that have highly cost-effective
possibilities of reducing GHG emissions. The report emphasizes the buildings sector, as improving the
energy performance of buildings will not only reduce GHG emissions but will also lead to financial
savings and a decrease in the need to invest in new energy generation capacities. Hence, renovation
of buildings is one of the most cost-efficient means for reaching Estonia’s climate goals [2].
[1] Reaching climate neutrality in Estonia, 2019, url: https://www.sei.org/publications/eesti-kliimaambitsiooni-tostmise-voimaluste-
analuus/#tutvu-raportiga (English summary available);
[2] Kulutõhusaimate meetmete leidmiseks kliimapoliitika ja jagatud kohustuse määruse eesmärkide saavutamiseks Eestis, url:
https://www.envir.ee/sites/default/files/news-related-files/aruanne_kliimapoliitika_kulutohusus.pdf
TARGETED STRATEGY
Overview
The Estonian building’s long-term renovation strategy (LTRS) developed according to the EPBD targets
the deep renovation of Estonian national building stock into highly energy-efficient and decarbonised
buildings by 2050, facilitating the cost-effective transformation of existing buildings into nearly zero-
energy buildings (NZEB), corresponding by Estonian regulations to energy class “C”. The LTRS forms
a part of Estonian integrated national energy and climate plan (NECP).
The full implementation of LTRS is expected to decrease the CO₂ emissions of Estonian building stock
up to 90% and contribute significantly to achieving the Estonian overall climate ambition. Considering
that as of 2019 Estonia’s national GHG emissions stand at 19 million tCO 2e/yr (of which ~4 million
tCO2e/yr are contributed by buildings), improving energy performance of buildings via deep renovations
plays a key role in reaching Estonia’s climate goals.
On top of that, the full implementation of LTRS will produce vast social benefits, improving the living and
working conditions of approximately 80% of the Estonian population and enabling Estonia to holistically
upgrade the quality of its spatial environment. The renovation of homes and working places as well as
demolition of underutilized buildings will improve the safety, aesthetic quality, health and accessibility of
the built environment as well as reduce cost of energy thus yielding direct societal benefits.
Analysis of the existing situation
The analysis of the existing situation carried out as part of LTRS has shown that existing building stock
contributes to about half of total energy consumption in Estonia with some ¾ of it originating from the
period between 1961 – 1990.
Estonia has a good track record when it comes to the renovation of the deep reconstruction of apartment
buildings, which has been successfully carried out for more than 10 years. By now, there has emerged
a demonstrated interest in performing reconstruction from apartment associations, an efficient financing
system as well as technical solutions that allow to achieve both over 50% energy savings and a healthy
6
indoor climate. Thanks to the reconstruction, the energy consumption of residential buildings has
remained at the same level for the last 15 years, despite the addition of new buildings.
Estonia has also successfully implemented a national energy performance certificate (EPC) system,
with all new buildings required to be NZEB (corresponding by Estonian regulations to energy class “A”
in case of new construction) as of the beginning of 2020.
However, despite these advancements, LTRS indicates that the present renovation mechanisms are
not sufficient to achieve the climate ambition of 2050. With the current trends, it is expected that about
80% of the private residential, 68% of the apartment buildings and 60% of the non-residential buildings
will not be renovated. When considering the building stock addressed in the strategy it could be expected
that only the state-owned real-estate would become renovated as required.
The present gaps and shortcomings that hinder the implementation of LTRS (summarized, as in detail
different building types have specific barriers):
• Technical barriers: 1) Lack of standardized renovation methods, techniques and integrated solutions;
2) Available technical solutions are laborious and time consuming, do not take into account climate
change, circular solutions or ensure the efficiency and capacity necessary to achieve the renovation
objectives; 3) Technical complexity of deep renovation is discouraging to owners; 4) Owners lack
information on how to combine deep renovation with other building improvements (retrofitting for
functionality, accessibility etc).
• Financial barriers: owners do not have sufficient financial resources to renovate their real estate,
neither do they have access to loans, mortgages etc that would cover the needed investments. This is
especially relevant for the rural and suburban areas, where real estate value is low. Financial barriers
vary depending on the owner and building type, but the most essential ones are: 1) Owners are reluctant
to finance the high up-front costs of deep renovation; 2) The pay-back time of investments needed for
improving energy performance is too long; 3) Lack of investors’ confidence in the stability of funding and
grants schemes; 4) Difficulties with covering mortgage co-financing based on regional differences in
real-estate value; 5) Existing grant schemes are not sufficient to finance the full implementation of LTRS.
• Social barriers: Even when owners have full understanding of what needs to be done in view of
improving energy performance of their real estate and have access to financing, there is a significant
number of owners who do not act. Main reasons for this are: 1) Renovation causes inconveniences such
as having to move out and pay for rental spaces, the process of finding suitable workforce and having
to coordinate the work is complicated; 2) Ownership or owner-tenant conflicts hinder the effective
approval of needed intervention (passive owners, owners with low cost acceptance, tenants expect
better environment, but do not wish to have increased rent payment etc); 3) Bureaucracy and regulations
seem cumbersome and the decision making process long and complex; 4) Low awareness of energy
efficiency and carbon footprint of operating buildings; 5) Avoiding renovation due to its wider
environmental impact (assessing negative impacts to natural environment to be higher than positive
impact of improved energy performance); 6) Conflicting renovation policies and interests (eg
improvement of buildings due to reasons other than energy performance, reduces owners interest and
financial capacity to later “redo” deep renovation).
In addition to the barriers hindering renovation, possible side-effects of an ambitious renovation program
need to be considered, pertaining to both market performance and natural environment. Though
mitigating the climate change by improvement of operational energy performance of buildings is severely
needed, it must not be done at the cost of environmental damage. Issues like handling increased
amounts of construction waste, understanding the wider impacts of the renovation to wildlife and natural
environment in general have to be considered.
See figure 1 for the preliminary analysis of the problems hindering the renovation of Estonian building
stock as well as the causes arising from renovation itself that need to be dealt with.
7
Figure 1 Problem tree analysis of planned implementation of LTRS
Regional differences
The analysis carried out as part of LTRS shows that the uptake of renovation grants varies greatly
between different regions. Ignoring regional and social aspects in policy application might result in social
polarisation, hence implementation of LTRS is tightly intertwined with Estonian regional policy,
addressing migration and demographical trends. On the one hand, energy performance-oriented
renovation subsidies must be aimed at the low-performing regions where market-based solutions give
little effect. On the other hand, LTRS admits rural decline and will not accelerate renovation in building
stock with no sensible purpose. For such buildings demolition is foreseen.
Different strategies are needed for advancing the deep renovation in Estonia depending on regional
development (see figure 2).
8
Figure 2 The value zones of real estate, affecting renovation loan capacity of building owners, describing different financial
support approaches needed to accelerate owners demand for deep renovation.
Low performing rural areas: Regions outside the biggest cities (or located in close proximity to them),
are less developed, communities have lower population density and lower incomes, real-estate values
are also lower. This causes rural regions to be less capable of financing renovation with their own
funding (savings, regular loans, mortgages) and makes them more dependent on state subsidies.
Declining towns: In the case of declining urban settlements, the strategy highlights the need of
compacting urban centres (often with historically valuable buildings). In settlements with an ageing and
declining population, it is important not only to demolish underused buildings, but also to ensure the
full functionality of the settlement, using demolition as an opportunity to improve the availability of
public services by bringing them together in synergetic spatial communities.
Target renovation volumes foreseen by LTRS
Considering the number of existing buildings, the share of already renovated buildings and the
projected decommissioning of buildings, in order to achieve LTRS goals outlined above the existing
building stock of ~ 54 million m² must be renovated by 2050 (see also figure 3), including:
~ 100,000 detached houses with a total floor area of 14 million m²,
~ 14,000 apartment buildings with a total floor area of 18 million m²,
~ 27,000 non-residential buildings with a total floor area of 22 million m².
Achieving these goals requires a five-fold average annual increase in the volume of deep renovation
(incl. ~ 2 times in the case of apartment buildings, ~ 4 times in the case of commercial buildings and ~
11 times in the case of detached houses) compared to the current level.
The total investment required amounts to ~ 21.6 billion euros, or an average of ~ 720 million euros per
year over the next 30 years. The public sector measures needed to implement the strategy and boost
reconstruction will total € 2.2 billion over the next 10 years. The financial need for future grants will be
9
further specified as the implementation of the strategy will gradually change the funding logic, market
capacity, needs and potential savings from innovation.
The LTRS established the following milestones:
• by 2030, 22% of the floor area of non-reconstructed buildings needs to be reconstructed,
• by 2040 - 64%
• by 2050 - 80-100%1
Figure 3 The renovation wave is expected to reach its maximum in 2035, where annually more than 2,3 million m 2 of buildings
need to be completely renovated. To prepare for this, capacity building among other things is needed.
Actions foreseen in view of implementing LTRS
The list of measures proposed for the full implementation of LTRS consists of:
• design of new (and development of existing) financial instruments (loans, warranties, grants etc);
• development of new renovation technologies (climate resilience, flood resilience technologies,
innovations of building materials, digital tools etc);
• increase of competences and awareness of key stakeholders on the renovation (guidelines, technical
counselling, environmental labelling systems etc);
• demolition of underused buildings, along with measures to improve circularity of building materials;
• considering the embodied energy and environmental impact in assessment of buildings;
• to achieve all this, significant capacity building of the involved authorities and stakeholders is needed
as well as efforts concerning research and development.
The introduction and large-scale start-up of comprehensive renovation takes time because it is
characterized by a steep learning process, a need for qualified labour, and the emergence of companies
and supply-chains aimed at renovation. Life IP BUILDEST will be essential in calibrating how Estonia
approaches this massive endeavour.
COMPLIANCE WITH LIFE INTEGRATED PROJECT PRIORITIES
The present project will help accelerate the renovation of Estonia’s building stock by building capacity
of the main agents engaged in renovation in Estonia.
LIFE IP BUILDEST is designed to drive the full implementation of LTRS. The project aims at establishing
multi-purpose mechanisms, synergies and integration: the proposal presents a comprehensive set of
actions that will deliver on their core objective – improvement of the energy performance of the Estonian
1 in practice, it can be assumed that up to 20% of privately owned buildings will not be reconstructed because the
owner of the building does not want to do so
10
building stock – and do so in a way that also delivers benefits for other environmental and climate
objectives.
The project is implemented on a national scale, engaging the whole of Estonia.
As the LIFE IP BUILDEST project to be developed is oriented towards contributing to the reduction of
greenhouse gas emissions of buildings, the priority area of the project is Climate Change Mitigation and
it shall have the following specific objectives according to the Article 14 of LIFE REGULATION:
(a) Project contributes to the implementation and development of EU policy and legislation
on climate change mitigation, including mainstreaming across policy areas, in particular
by developing, testing and demonstrating policy or management approaches, best
practices and solutions for climate change mitigation.
• Planned IP project aims to establish mechanisms for the full implementation of LTRS.
In addition, decarbonization of Estonia’s building stock is also stressed in National Energy and
Climate Plan (required according to the regulation on the governance of the energy union and
climate action (EU/2018/1999)). The importance of energy performance of buildings and efforts
needed to improve it in the EU are stressed in the Energy Roadmap 2050 and the foreseen
project objectives link with the aims of the National Development Plan of the Energy Sector until
2030.
• Project also aims to contribute to the implementation of the Sustainable Energy and Climate
Action Plans (SECAPs) of Estonian climate leader municipalities in the field of energy
performance of buildings. Need to consider the changing climate when building new houses
and carrying out renovation is stressed in the national Climate Change Adaptation Development
Plan until 2030, a document stemming from the EU Strategy on adaptation to climate change.
Project concept development has been steered by the Ministry of the Environment (KeM) and
coordination and cooperation is ongoing between LIFE IP BUILDEST (sub-programme
mitigation) and LIFE IP AdaptEst (sub-programme adaption) project development teams. The
core team developing the project concept of LIFE IP BUILDEST has introduced the project
content (including the draft and final versions of CN) to representatives developing AdaptEst
project to avoid any overlapping of the content of proposals.
• LIFE IP BUILDEST project contributes to the aims of the freshly published EU GREEN DEAL,
more specifically its initiatives:
Renovation wave: a policy presently under development (to be announced mid-October 2020
and integrated into the project by Full proposal;
EU circular economy strategy. Construction and demolition waste make up just over one third
of total waste generation in the EU. More precisely the project objectives will have to correspond
to the principles of the strategy for a sustainable built environment (expected to be finalized in
2021). Based on this, the national framework and practices need to be developed as well as put
to practice. Circular approaches are key to increasing the quality and quantity of recycling and
reuse of construction and demolition materials.
(b) Project improves the knowledge base for the development, assessment, monitoring,
evaluation and implementation of effective climate change mitigation actions and
measures and to enhance the capacity to apply that knowledge in practice.
LIFE IP BUILDEST works out building typology and ownership-based renovation measures to
decrease energy consumption and CO2 emission as well as to extend the service life of buildings
that would minimize additional renovation of already renovated or constructed buildings in the
future. The project will also increase the awareness about improving the quality of indoor climate
and health aspects through energy renovation and building performance improvements,
highlighted by EU policy makers in the 2nd EPBD review.
(c) Project facilitates the development and implementation of integrated approaches, such
as for climate change mitigation strategies and action plans, at local, regional, or national
level.
LIFE IP BUILDEST project establishes framework for the full implementation of LTRS, by
developing necessary mechanisms and combining and engaging additional complementary
measures for the deep renovation of buildings and mainstreaming the initiative across sectors
and streamlining the renovation across the country, both on the national and regional levels.
11
(d) Project contributes to the development and demonstration of innovative climate change
mitigation technologies, systems, methods, and instruments that are suitable for being
replicated, transferred, or mainstreamed.
Innovations will be developed in the field of developing proven plug & play prefab deep
renovation solutions using building elements and building services. To support the climate
change mitigation ambitions, a step towards holistic circular renovation products and concepts
as well more efficient use of physical infrastructure (buildings and associating systems) will be
taken through real-time control and automated monitoring.
New solutions will provide low cost monitoring of indoor climate conditions by specific energy
flows related to behaviour e.g. ventilation, domestic hot water (DHW) and indoor temperature.
Periodically providing energy information related to behaviour of the occupants.
Digital solutions will be developed to engage more effectively with the stakeholders, local
administrations, and the changing environment (both physical environment as well as the
economy, welfare issues etc). Emphasis is put on participation and co-design.
As existing renovation concepts are mainly based on operational energy performance of
dwellings, embedded energy and circularity will also now be considered. Holistic approach is
planned to be adopted for evaluating built environments carbon footprint, which learns, adapts,
and innovates and thereby responds more effectively and promptly to changing circumstances.
Renovation innovation approaches will be tested and monitored for development of best
practices (incl. use of prefabricated elements, low carbon, and biobased materials etc).
2. Project objectives
OBJECTIVES OF LIFE IP
The primary objective of the current project is to pave the way for reducing CO₂ emissions of Estonia’s
existing building stock by up to 90% (~4 million tCO₂/yr) by 2050 thus mitigating the effect energy
performance of buildings has on climate change. That, in turn, is accomplished via building capacity and
aggregating demand for implementing Estonia’s LTRS.
LIFE IP BUILDEST will raise capacity, increase experiences, and develop the necessary toolset for
improving energy performance and reducing carbon emissions of Estonian building stock in required
rate and depth set in LTRS (LTRS, pg 2). LIFE IP BUILDEST will also provide national framework for
carrying out the EU Renovation Wave Initiative. Sectorial capacity building foreseen in the LIFE IP
project will help to adopt the initiative effectively by avoiding negative consequences (possible market
failures and negative environmental impacts), establish a national framework for fast adoption of the
regulations and financing measures, and improve cross-sectoral mainstreaming of the renovation
mechanisms.
To achieve this strategic goal, the IP will tackle the following sub-targets:
Sub-target 1: Develop, test and demonstrate tools for decarbonizing Estonian existing building
stock, such as develop renovation guidelines, establish best practices and demo showcases, propose
and pilot innovative motivational schemes and business models.
The first sub-target is directly focused on the mitigation of the effects of climate change caused by low
performing buildings and substantial share of project funds are designated for implementing actions
foreseen under this section. Sub-targets 2-3 will contribute improved technical knowhow and deliver
capacities related with longevity of the effects (planning for circularity) and resilience of the interventions
(accepting and adapting to climate risks). Sub-targets 4-5 are aimed to streamline the replication of the
effects of the project during and after the project.
Sub-target 2: Establish climate risk evaluation criteria for deep renovation, and so ensuring climate
resilience of buildings by designing and renovating them to last longer, avoid numerous renovations,
improve their preparedness to withstand extreme weather conditions and consider the reduced cost for
heating, cooling and hygrothermal performance of buildings due to changing climate, flood resilience
technologies;
Sub-target 3: Apply resource efficiency and circularity principles for renovation (and construction
sector as whole), such as circular use of materials, use of biobased materials, and high-quality recycling
12
of construction materials, phasing out hazardous substances, incorporate waste treatment and pollution
prevention principles, as well as considering the embodied energy and environmental impact of building
in assessment of buildings;
Sub-target 4: Advance digital technologies for renovation, including development e-building
platform appliances for energy performance, smart readiness of building renovations, energy
performance monitoring and assessment and calculators and other tools for advancing deep
renovations among building owners;
Sub-target 5: Increase capacity of relevant stakeholders and aggregate demand both among
private owners of residential buildings as well as managers of commercial and public real estate. The
project will develop demonstration buildings for deep renovation and climate resilient renovation, raise
awareness among general public to improve the public perception towards preferring renovation.
Figure 4: Diagrammatic summary of Life IP BUILDEST objectives and work packages.
OBJECTIVES OF COMPLEMENTARY MEASURES
The objective of engaging complementary measures is to mainstream project results to the Estonian
renovation wave, replicating the best practices of the project in renovations of Estonian buildings during
and after the project and adopting the developed toolset by wider audience (local municipalities,
companies, building owners etc).
Additionally, the project aims to intertwine the project with additional complementary projects for
elaborating the advancement of the know-how, technologies, and innovative solutions by research
activities. Also, aside to mainstreaming the project results geographically, the project aims to engage
thematic complementary measures, which are expected to engage and develop also healthy living
environment (access issues for disabled, insolation etc), greening built environment with nature based
solutions, energy system infrastructure improvement and mainstreaming renewable energy sources in
renovations.
Ministry of Environment, whilst also participating as beneficiary in the current project, is also developing
a LIFE Clima IP AdaptEst proposal to the adaption sub-programme, which will implement the Climate
Change Adaptation Development Plan until 2030 (NAP). The current LIFE IP BUILDEST would perform
as significant complementary for the aforementioned project taking into practice the issues related to
adapting the Estonian building stock to the changing climate. LIFE AdaptEst will develop long-term
climate scenarios (according to the IPCC methodology) that will be used by IP BUILDEST for developing
detailed construction specific climate models to be used for baseline computing parameters in building
standards and guidelines (the parameters presently based on historical data). No overlapping of actions
between two IP-s, as cooperation between the two proposal development teams has been active and is
aimed to continue.
13
The content and aim of involving complementary measures are more specifically described under sub-
targets in the following section.
HEALTHY LIVING ENVIRONMENT AS A RESULT OF RENOVATIONS
Strategies for minimising the risk of contagion in building spaces whilst likewise minimising energy usage
are of importance to the healthy, safe and efficient operation of buildings going forward. Ensuring proper
ventilation with outside air can help reduce airborne contaminants indoors, including the virus that
causes COVID-19. The same COVID-19-vulnerable population would be the same group of people who
are also vulnerable to overheating. The double impacts of risk of exposure to COVID-19 and indoor
overheating become a serious concern, especially for senior people. Within building spaces the use of
100% outdoor air would help minimise the risk to contagion however, this is not always possible given
that currently existing HVAC systems cannot cope with the increased cooling loads during the summer
periods should this degree of recirculation be used.
The BUILDEST project provides specific information on building service systems strategies to optimize
the performance of HVAC or passive ventilation systems in buildings and to identify potential gaps in
their performance. The assessment process is carried out using a simulation of both archetypal buildings
and specific buildings. In addition, the available air cleaning equipment will be evaluated as possible
solutions for installation in existing buildings, thus helping to ensure that the risk of contamination
through airborne contamination of the buildings under investigation is minimized.
3. Actions and means involved:
The LIFE IP BUILDEST project will tackle the objectives described above via a series of actions to
achieve the aimed results (described below).
The planned intervention logic of LIFE IP BUILDEST (see figure 5 below) is capacity building focused,
whereas project actions are selected based on their scalability with available complementary funding
and synergies developed during the project. Raising the capacity necessary for the full implementation
of LTRS consists of advancement of toolset of deep renovation (sub-target 1), climate resilience (s-t 2),
resource efficiency (s-t 3) and digitalization of the processes. The developed toolset (financial models,
technical standards, computing parameters for future climate and resource efficiency solutions, smart
renovation tools and outputs provided by competence cluster) will be tested on the renovation showcase
buildings. The latter will be used to promote the developed mechanisms and aim to mainstream the
deep renovation via replication of the project results.
Specific actions described below as parts of work packages are structured according to the Life IP
regulation, with A being preparatory; C concrete, D monitoring, E dissemination and F management
actions.
See the intertwining of project actions and main outputs of the LIFE IP BUILDEST project in Annex II,
figure II-1
14
Figure 5 The planned intervention logic of LIFE IP BUILDEST project focuses capacity building of renovation, whereas selected core themes corresponding with the project objectives are expected to
be given development leap.
15
SUB-TARGET 1:
DEVELOP, TEST AND DEMONSTRATE TOOLS FOR DECARBONIZING ESTONIA’S EXISTING
BUILDING STOCK
Work package 1:
Development of stakeholder specific financial models and policy instruments for deep renovation
Actions foreseen in LTRS: Corporate buildings, pg 77-78; Private residential buildings, pg 77; Residential apartment buildings: pg
77; Industrialized renovation, pg 72; Fitness checks for policy and decision procedures pg 74.
Financed in LIFE
The work-package will analyse and propose a fitness check for the existing grant schemes presently
available. LTRS has indicated the issues to be tackled on most available schemes but proposes further
questions to be solved prior to reforming the schemes. Project will also analyse the suitability of different
innovative renovation business models (cost-sharing etc) for Estonian market and proposes the
adoption of the most appropriate models for all building types.
Analysis of socio-economic impacts of pollution-based taxation of energy performance of buildings is
planned to be carried out and measures will be proposed based on that.
Based on the preliminary analysis described above, regulation is established for applying the financial
mechanisms, policy documentation will be developed for supporting renovation for corporate buildings,
improvements will be proposed to the existing schemes for private residential and apartment buildings.
Cooperation models will be encouraged, examined, and monitored to accelerate the renovations on
regional (district or settlement) level. Market regulation will be assessed and rationalized if needed to
improve the adoption of high-potential business models.
The activities foreseen in the work-package will mostly be carried out by project staff, in some specific
fields of expertise external consultants will be engaged. For transferring existing best practices study
visits and international meetings will be carried out and for the replication of developed Estonian policy
international seminar will be arranged, which both will include travel and seminar cost.
Actions foreseen in the WP1:
A1.1 Fitness check of existing grant schemes; Analyses of innovative renovation business models;
A1.2 Fitness check of renovation policy;
A1.3 Development of new and improved financing instruments for deep renovation, incl.
• Support scheme for corporate buildings;
• Improvement of existing schemes (detached houses, apartment buildings) (based on A1.1);
• Development of new business models (based on A1.1);
• Development of community led cooperation model and complex grant for district bases deep-
renovation;
A1.4 Analysis of socio-economic impacts of pollution-based taxation of energy performance of
buildings;
A1.5 Development of communication driven, and socially responsible motivation set for deep
renovations;
C1.1 Improvement of national renovation policy: development and approval of legislative
documentation for the financial instruments developed, facilitating national implementation of
Renovation Wave initiative across sectors;
D; E tbd by full proposal
Potential complementary
Project will analyse the existing ongoing financial schemes available for deep renovation of Estonian
building stock. The schemes include internal management resources for monitoring the application rate,
quality, and efficiency. For the overall fitness check carried out within the project, these results will be
used. Also, project will monitor the application and socio-economic impacts of the mechanisms
available, for which it will be needed to review the monitoring data of separate schemes.
• KredEx renovation grant for renovation of apartment buildings;
• KredEx reconstruction grant for small residences;
• KredEx Housing Loan Guarantee;
• KredEx industrial renovation grant;
16
• KredEx support for home renovation for large families;
• KIK Resource Efficiency Grant for Industries;
• Financial support schemes and business developed within project will also include the internal
monitoring;
Related research and development activities of project beneficiaries (ongoing and planned)
• EKYL: POWERPOOR - Empowering Energy Poor Citizens through Energy Cooperative Initiatives
(ongoing);
• EKYL: SMART FINANCE EST – Estonian National Roundtable to Implement Smart Financing for Smart
Buildings (requested);
• Different research and innovation project are foreseen to be submitted to various financing
instruments during project period to advance policy improvement in Estonia.
Work package 2:
Development of building and stakeholder type specific technical solutions and guidelines to streamline
the renovation
Action foreseen in LTRS: New technological solutions pg 72; Advancement of technical know-how pg 74.
Financed in LIFE
This work-package will include development of building type specific technical solutions for deep
renovations, including deep renovation solutions for typical building envelopes and technical systems of
residential buildings, corporate and public buildings. Specific attention will be given to valuable historical
buildings, for which technical energy performance improvement solutions will be proposed (eg interior
insulation, façade concealed insulation, adaptive indoor climate systems, restoration principles etc).
Greening solutions applicable in renovations and suitable for Estonian buildings and climate (incl:
nature-based solutions (NBS) inclusion, adopting renewable energy solutions, biodiversity
considerations etc) will be formulated and published. Advancing prefabricated renovation solutions
(digitalization of workflows and improvement of service delivery) will be carried out.
Stakeholder specific recommendations on how to comply with the terms of reference for contracting
renovation will be developed based on the technical solutions developed within the project. Also, based
on the above, demo designs will be prepared for typical building envelopes used in Estonia and
renovation info-charts will be developed and published (online) for self-learned private builders.
Improved renovation solutions will be adapted to the existing guidelines and training programmes for
professional builders.
The activities foreseen in the work-package will mostly be carried out by project staff, in some specific
fields of expertise external consultants will be engaged. For transferring existing best practices available
in EU study visits and international meetings will be carried out and for the replication of developed
technical solutions the results have to made available for the target audience by different publication
options (eg demonstrating solutions on building oriented tv-programs, newspapers and professional
social media channels as well as publishing the results on scientific journals), for which communication
costs will be budgeted.
Actions foreseen in the WP2:
A2.1 Development of building type specific technical solutions for deep renovations, incl technical
solutions for deep renovation of:
• detached and terraced houses;
• apartment buildings;
• corporate and public buildings;
• valuable historical buildings (eg interior insulation, façade concealed insulation, adaptive indoor
climate systems, restoration principles etc);
A2.2 Preparation of demo designs for typical building envelopes and service systems;
A2.3 Development of guidelines for greening buildings during renovations
A2.4 Advancement of prefabricated renovation solutions
E2.1 Compilation and publishing of renovation info-charts
E2.2 Inclusion of improved renovation solutions into the guidelines and training programmes for
professional builders (based on A2.1, A2.2);
E2.3 Delivery of stakeholder specific recommendations how to comply terms of reference for
contracting renovation.
17
D; E tbd by full proposal
Potential complementary
Project will combine the best practices related to technical solutions for renovation developed externally
in different research and innovation projects:
Related research and development activities of project beneficiaries (ongoing and planned), incl:
• TalTech: Moisture safety of interior insulation, constructional moisture and thermally efficient
building envelope (ongoing);
• TalTech: Zero energy and resource efficient smart buildings and districts (ongoing);
• TalTech: FINEST TWINS: Establishment of Smart City Center of Excellence (ongoing);
• TalTech: TRAC4Serial – Serial Refurbishment for typical multi-family buildings (requested);
• Different research and innovation project are foreseen to be submitted to various financing
instruments during project period to advance energy performance oriented renovation with
innovative solutions (planned, not submitted).
Work package 3:
Renovation showcase: pilots, demos, and best-practices buildings
Action foreseen in LTRS: renovation of buildings pg 58-60.
Financed in LIFE
Work-package will create a renovation showcase, which includes renovation of buildings according to
the best available knowledge and by piloting the solutions developed in WP2, WP4 and WP5. The
renovation showcase will also be used for demonstration purposes (detached houses, apartment
buildings prefabricated offsite renovation, non-residential private and public buildings primarily in
lighthouse towns Tallinn, Tartu, Võru and Rakvere).
Renovation showcase renovated within the project is in the ownership of project beneficiaries (RKAS,
municipalities) and residence owners, but agreements might be needed with building tenants.
For the building types for which the showcase will be created using complementary funding (private
residential, corporate, apartment buildings), also agreements must be established with building owners,
who agree to go through the process of testing available complementary schemes. Here the business
models developed in WP1 and capacity building foreseen in WP7-8 will be combined for best results.
Based on the results of WP2, building specific technical designs (also for selected renovations to be
carried out with complementary funding) will be developed and permits will be acquired for carrying out
the renovations.
The preparation and monitoring activities foreseen in the work-package will mostly be carried out by
project staff, in some specific fields of expertise external consultants will be engaged. Actions in the WP
related to concrete renovations will include investments as well as prototype costs (consideration has
been given to the budget restrictions no exceeding the investment cost of single item over 500 000 eur).
Other costs like permit fees, life notices for communication etc are to be budgeted.
Actions foreseen in the WP3:
A3.1 Establishing agreements with building owners, tenants;
A3.2 Developing building specific technical designs;
A3.3 Acquiring permits for renovations;
C3.1 Renovation of local municipality and state-owned buildings;
C3.2 Task specific renovation pilots in residential buildings;
D3.1 Monitoring the efficiency of renovation to reduce the use of operational and embodied energy;
D; E tbd by full proposal.
Potential complementary
Best practices developed within the project will be implemented also on the renovations financed with
complementary measures:
Pilots TalTech: FINEST TWINS: Establishment of Smart City Center of Excellence (ongoing);
Renovation to be carried out with complementary funding (listed also under WP1):
• KredEx renovation grant for renovation of apartment buildings;
• KredEx reconstruction grant for small residences;
• KredEx Housing Loan Guarantee;
• KredEx industrial renovation grant;
• KredEx support for home renovation for large families;
18
• KIK resource efficiency Grant for industries;
• Renovation of corporate buildings by private owners (TBD);
• Financial support schemes and business developed within project.
SUB-TARGET 2:
ESTABLISH CLIMATE RISK EVALUATION CRITERIA FOR DEEP RENOVATION
Work package 4:
Modelling climate risks, adopting the results in renovation standards and regulations and testing smart
adaptation solutions
Action foreseen in LTRS: Advancement of technical know-how pg 74.
Financed in LIFE
Work-package will be oriented towards developing technical competences for adapting renovations with
changing climate. Presently the computing parameters used in construction engineering, which consider
the climatic conditions the buildings operate in, use historical climate information (Estonian climate 1970-
2000). Future climate scenarios need to be considered so that the renovated building would be climate
resilient and operate efficiently.
To achieve this, it is firstly needed to develop target specific future climate models and computing
parameters (using national climate scenarios developed project according to IPCC methodology).
Based on that technical solutions will be prepared for mitigating the climate stresses to the building
envelopes. It is also planned to develop planning tools and control interfaces for mitigating flood risks
on buildings. Specifically, flooding resilient engineering solutions planned to be developed provide
advice on how to design or modify building envelope, in order to promote fast drying and to minimise
the extent of necessary renovation works in case of flood water is entering the building.
The climate resilience specific solutions will be included to the technical guidelines developed (WP2)
and piloted on renovation showcase buildings (WP3). Also, specifically smart flooding control measures
will be piloted in the districts where renovation initiative is hampered by regular urban flooding (incl.
stormwater flooding and raise of water table in natural waterbodies).
The preparation and monitoring activities foreseen in the work-package will mostly be carried out by
project staff, in some specific fields of expertise external consultants will be engaged. Actions in the WP
related to pilot actions will include investments as well as prototype costs (consideration has been given
to the budget restrictions no exceeding the investment cost of single item over 500 000 eur). Other costs
like permit fees, life notices for communication etc are to be budgeted.
Actions foreseen in the WP4:
A4.1 Development of target specific future climate models and computing parameters;
A4.2 Preparation of technical solutions for mitigating climate risks for building envelopes (to be
included to the technical guidelines A2.1) and piloted on renovation showcase buildings (C3.1
and complementary);
A4.3 Development of planning tools and control interfaces for mitigating flood risks to buildings;
A4.4 Fitness check for urban stormwater regulation;
C4.1 Adopting climate risk considerate renovation principles in existing building standards and
regulations;
C4.2 Piloting the real-time control systems (MPC; RBC) for smart and cost-efficient flood control and
dry-proofing strategy of building envelope;
C4.3 Improvement of national urban flood policy and planning tools;
D; E tbd by full proposal
Potential complementary
The technical solutions developed within the project related to the renovation of the buildings will be
mainstreamed by adoption of the solutions to standards and guidelines and requirements related to the
subsidy schemes (see WP1). Specific solutions related to urban flooding and reducing the flooding
duration and intensity damaging to buildings will be mainstreamed by using the
KIK grant scheme for urban flood management; where developed smart solutions will be promoted.
KeM (planned, submitted as CN): LIFE Clima IP AdaptEst, actions concerning development of improved
climate scenarios for Estonia.
19
Also, related research and development activities of project beneficiaries (ongoing and planned) will be
used to develop the project toolset:
• TalTech: NOAH, Protecting Baltic Sea from untreated wastewater spillages during flood events
in urban areas (ongoing);
• TalTech: Depart, Decentralized real-time control platform for urban drainage systems in climate
proof smart cities (ongoing);
• TalTech: CleanStormwater, Testing new storm water treatment solutions for reduction of
hazardous substances and toxins inflows into the Baltic Sea (ongoing);
• TalTech: TraiNBS, Transition Route to Achieve Integrated Nature Based Solutions for water
quality improvement across urban water cycles (requested)
• Different research and innovation project are foreseen to be submitted to various financing
instruments to advance climate resilience oriented renovation with innovative solutions
(planned, not submitted).
SUB-TARGET 3:
APPLY RESOURCE EFFICIENCY AND CIRCULARITY PRINCIPLES FOR RENOVATION
Work package 5:
Advancing resource efficiency and circular solutions for renovation
Action foreseen in LTRS: Advancement of technical know-how pg. 74; Demolition of abandoned buildings pg. 76.
Financed in LIFE
Work-package is aimed to reduce the environmental impact of renovation wave concerning vast
amounts of construction waste derived from the enforced retrofitting. Firstly, it is aimed to develop
national building type specific methodologies for carbon footprint assessment, by transfer and replication
of existing experiences available in EU to be adopted in Estonian regulation.
The EU Circular Economy Strategy foresees aims to publish the sub-document of Sustainable Built
Environment Strategy, according to which a national roadmap is planned to be developed. The roadmap
will include a list of complementary measures engaged for its further implementation.
Besides developing regulatory and strategical directions in the field, also improvement of technical
circularity solutions is needed to design the renovations carried out with the LIFE IP and complementary
measures for circularity (design for disassembly, develop technical solutions for reuse of demolished
materials etc). The circularity oriented technical solutions will be included to the technical guidelines
developed (WP2) and piloted on renovation showcase buildings (WP3).
Specifically, additional circularity pilots are to be developed based on the demolition of abandoned
buildings. The different circularity-oriented uses of materials demolished during renovations will be
piloted in frame of interdisciplinary student workshops to boost creative uses and innovative solutions
without practical obstacles. Aside for creativity-oriented student workshops, the repurposing of
demolished materials will also be practiced industrially scalable level.
Actions foreseen in the WP5:
A5.1 Developing national building type specific methodologies and materials database for carbon
footprint assessment;
A5.2 Developing national roadmap based on Sustainable Built Environment Strategy (sub-document
of EU Circular Economy Strategy to be published 2021)
A5.3 Assessment of circularity, reuse, and recycling potential of the building materials in typical
demolished buildings;
A5.4 Preparation of market uptake of circularity, reuse, and recycling solutions of construction waste:
applying innovative procurements (incl. GPP), improving regulation on end of waste criteria,
mainstreaming product passports etc);
A5.5 Developing technical recommendations for improving material circularity in construction (to be
included to the technical guidelines A2.1, and dissemination materials E2.1, E2.2) and piloted
on renovation showcase buildings (C3.1, C3.2, C3.3)
C5.1 Applying building carbon footprint methodology in regulation;
C5.2 Demo circularity/reuse/recycle renovations
D; E tbd by full proposal
20
Potential complementary
Hereby it is needed that project helps to raise relevant complementary funding for the implementation
of developed Estonian national roadmap for Sustainable Built Environment Strategy. For this the LIFE
IP BUILDEST consortium has to make a joint effort to allocate both national funds as well as to aim for
the use of available EU funding. Roadmap and its implementation plan (incl financial plan) will be
developed and agreed with relevant authorities.
For promoting market uptake of technical solutions advancing circularity in renovations it is planned to
engage the ERMEL: Competence centre of circular use of waste;
Best practices are expected to be developed using the funds of RaM: Initiative for demolition of
abandoned apartment buildings;
Related research and development activities of project beneficiaries (ongoing and planned):
• TalTech: Drive0, Driving decarbonization of the EU building stock by enhancing a consumer
centred and locally based circular renovation process (ongoing);
• Different research and innovation project are foreseen to be submitted to various financing
instruments to advance circularity and resource efficiency oriented renovation with innovative
solutions (planned, not submitted)
SUB-TARGET 4:
ADVANCE DIGITAL TECHNOLOGIES
Work package 6:
Smart renovation tools
Action foreseen in LTRS: Digital tools for energy audits and energy labelling pg 72; Advancement of building registry pg 73;
Digital tools for owners pg 73; Advancement of technical know-how pg 74; Fitness checks for policy and decision procedures pg
74.
Financed in LIFE
Improvement of digital technologies is needed to streamline the deep renovation, as this helps to simplify
processes, reach wider audiences, and deliver better results with the same workforce. The digital tools
developed are aimed to 1) increase capacity of competence cluster; 2) help building owners understand
the need for deep-renovation and develop first idea how the energy performance of their property could
be improved; 3) help building owners adopt digital technologies, which aim for improved energy
performance of buildings; 4) advance the understanding of the wider impacts of renovations.
The work-package includes preparatory work (eg business analyses and development of functional and
non-functional requirements) as well as programming and making the developed digital toolset available
for the target audience.
Actions foreseen in the WP6:
A6.1 Development of national principles for applying smart readiness indicator toolset for renovations,
piloting the toolset on renovation showcase buildings (C3.1 and complementary);
A6.2 Proposing and developing performance-based energy use monitoring system for buildings;
A6.3 Preparatory work for development of stakeholder based digital tools for building owners;
C6.1 Advancement of e-construction platform with energy performance certificate module;
C6.2 Piloting performance-based energy use monitoring system in the Estonian Register of Buildings;
C6.3 Producing carbon footprint Building Information Modelling (BIM) resources (“Green BIM”);
C6.4 Programming the stakeholder based digital tools for building owners:
• Building type specific energy performance calculators (corporate real-estate, detached houses
and apartment buildings);
• Renovation planning tools for building owners (detached houses and apartment buildings);
• Energy performance monitoring tools for state, municipal and corporate real-estate;
E6.1 Development of visualization tools for building energy performance combining digital twins for
motivating investments;
D; E tbd by full proposal
Potential complementary
It is foreseen that different MKM initiatives related to e-construction platform not directly related to energy
performance of buildings and renovation will be linked to the advancement of digital technologies in the
21
LIFE IP BUILDEST (eg digitalization of system networks, advancement of the digital twin of Estonian
building stock, etc), the exact synergy is to be developed by full proposal.
Related research and development activities of project beneficiaries (ongoing and planned):
• TalTech: FinEstTwins smart solutions for energy performance of built environment;
• TalTech: Towards a new generation of user-centred Energy Performance Assessment and
Certification; facilitated and empowered by the EPB Center (ongoing)
• EKYL - VIRTUOUS – Virtualization of Buildings, Prosumers and Users for Improved Comfort
and Efficiency
• Different research and innovation project are foreseen to be submitted to various financing
instruments to advance renovation digitalization with innovative solutions (planned, not
submitted).
SUB-TARGET 5:
INCREASE CAPACITY OF RELEVANT STAKEHOLDERS AND AGGREGATING DEMAND
Work package 7:
Increasing competences of renovation
Action foreseen in LTRS: Fitness checks for policy and decision procedures pg 74; Mainstreaming renovation pg 74;
Advancement of technical know-how pg 74.
Financed in LIFE
Although the whole intervention logic of LIFE IP BUILDEST is based on capacity building, this work-
package is specifically dedicated to developing a competence cluster, which will tune and mainstream
deep renovation across policies and establish synergies between policy sectors.
The competence cluster will be comprised of:
• KredEx deep-renovation competence unit, which will hold different (eg technical engineering,
financial, social and climate policy) competences and participate in policymaking (WP1) and
establishing synergies across policies. The unit will be responsible for monitoring the
implementation of LTRS;
• RKAS procurement unit, which will advance the local municipality governments competences
on how to achieve most cost-optimal solutions for deep renovations initiated on regional
levels;
• EKÜL and MARK deep renovation unit, which will motivate the private owners to renovate
their properties;
• Regional units in municipalities (energy agencies, building officials, NGO-s).
The work-package will include actions, which will aim to mainstream the deep-renovation with
complementary measures – train the relevant stakeholders, promote the measures available, develop
documentation how to carry out renovation procurements, provide consultations for application
procedures.
Also, the action will include the improvement of LTRS and development of long-term operational plan
and roadmap to achieve the goals set for 2050.
Actions foreseen in the WP7:
A7.1 Tuning and mainstreaming renovation across policies: creation of synergies, detaching
renovation initiative from ‘siloed’ policies, simplifying processes, and raising awareness of
decisionmakers;
A7.2 Preparation of long-term operational plan for LTRS to improve the quality of LTRS;
A7.3 Developing demo procurement documentation for renovation, including qualification and
success criteria for:
• Improvement of renovation circularity;
• Improvement of climate resilience;
• Maximizing cost-efficiency of energy performance.
• Piloting the procurements in showcase renovation buildings (C3.1, C3.2, C3.3)
E7.1 Training key stakeholders (municipal building officials, technical regulation officers etc);
22
E7.2 Renovation innovations competition
D; E tbd by full proposal
Potential complementary
Related research and development activities of project beneficiaries (ongoing and planned):
• EKYL - SHEERenov – Seamless services for Housing Energy Efficiency Renovation (ongoing);
• EKYL - POWERPOOR - Empowering Energy Poor Citizens through Energy Cooperative Initiatives ;
(ongoing);
• EKYL - EnergyTakeaway - Enabling and Supporting Householders to Tackle Energy Poverty
(requested);
• EKYL - WE NERGY - Living Labs for Consumer Empowerment and Collectively Driven Energy
Actions (requested);
Work package 8:
Aggregation of demand
Action foreseen in LTRS: Awareness raising (pg 75).
Financed in LIFE
As described above, in section “1. Overall context”, there are a wide variety of barriers hindering the full
implementation of LTRS and it is expected that with present mechanisms the aimed renovation rate will
not be achieved. This project will provide solutions or toolset for most of the identified barriers, but in
addition significant attention has to be given to raising the building owner’s awareness about the
possibilities made available for them.
Work-package will include campaigning as well as direct consultations to key stakeholders representing
the low performing target-groups.
Actions foreseen in the WP8:
E8.1 Cross-media campaigns to raise awareness on the renovation policy among key target groups
incl
• Private residential building owners and self-taught builders;
• Low performing apartment building associations;
• Business real-estate owners;
• Real estate managing companies;
• Local municipality governments.
E8.2 Consulting services for low performing target-groups with high impact on improvement of energy
performance, incl:
• Low performing apartment building associations;
• Local municipality governments.
Potential complementary
Related research and development activities of project beneficiaries (ongoing and planned):
• EKYL: SMART FINANCE EST – Estonian National Roundtable to Implement Smart Financing
for Smart Buildings (ongoing);
• EKYL - EnergyTakeaway - Enabling and Supporting Householders to Tackle Energy Poverty
(requested);
• EKYL - WE NERGY - Living Labs for Consumer Empowerment and Collectively Driven Energy
Actions (requested);
Work package 9:
LIFE IP project management
Financed in LIFE
The purpose of the work package is to manage the project in a well-coordinated manner to ensure that
it is implemented according to its purpose. To achieve this, the project will be managed transparently
with efficient and open decision-making and communication process. Efficient project execution will be
joint responsibility of project beneficiaries and will be carried out in a supervision of coordinating
beneficiary.
Coordinating beneficiary will be responsible for the general grant management (administrative,
technical, and financial aspects) and for fulfilling the reporting obligation set in grant agreement. The
23
Coordinator will also act as a permanent helpdesk for all project participants, providing practical support
particularly for the compilation of Financial Statements in compliancy with the LIFE regulation and the
Grant Agreement and its annexes, where necessary.
Also, disseminating project results according to LIFE communication rules, project communication
strategy and replication plan. Project overall communication will be achieved by launching and regularly
updating a website (with members only section, stakeholder specific content, references to relevant
LIFE, EC, project network information etc).
Management team will be established between project beneficiaries in the start of the project for
the operational coordination of the project. Coordinating beneficiary will employ general project
manager and technical assistant for fulfilling the grant management duties. Other beneficiaries will
decide whether to employ separate (part-time) manager for the project or use existing staff also for the
grant management related tasks.
The work routines and rules of the project management team will be agreed in the beginning of the
project and different working documents will be developed for simplifying the further work, these are
• project management wiki: agreements, example documents, establishing network of contact
persons;
• communication strategy;
• transferability and replication strategy;
• tuned monitoring program (including KPI and complementary monitoring);
Project management team will be jointly responsible for monitoring of KPI and impacts of complementary
measures.
In the frame of project management work-package also international cooperation with EU projects is
foreseen, in which it is foreseen that all beneficiaries participate.
Steering panel. Considering the importance of the project and its relevance to several policy fields, a
high level steering panel will be set up consisting coordinating beneficiary (MKM, ministries of finance
(RaM) and environment (KeM), research institution (TalTech) and representative of demand side
(EKÜL). The Steering Committee will be responsible for cording the long-term planning of the project
and steering the progress, also it will direct projects coherence with overall policy and initiatives in the
sector and additionally guard background rights, foreground rights and protection of knowledge, if
necessary.
Actions foreseen in the WP9:
A9.1 Development of project management wiki: agreements, example documents, establishing network
of contact persons;
A9.2 Preparing and agreeing internal plans for the beneficiaries, including:
• communication strategy;
• tuned monitoring program;
• transferability and replication strategy.
D9.1 Monitoring of KPI;
D9.2 Monitoring of impacts of complementary measures;
E9.1 Disseminating project results according to LIFE communication rules, project communication
strategy and replication plan, web, media, etc
E9.2 Project networking with similar projects and international cooperation;
F9.1 Grant management among all beneficiaries: operational management, steering, reporting,
auditing etc (F).
F9.2 Engaging additional complementary funding to increase renovation rate and depth;
Potential complementary
Distributing project experiences via different projects (list of projects provided in CNf).
24
4. Expected results (main outputs and achievements,
qualitative and quantitative):
Sub-target 1: DEVELOP, TEST AND DEMONSTRATE TOOLS FOR
DECARBONIZING ESTONIA’S EXISTING BUILDING STOCK
WP1: Development of stakeholder specific financial models and policy instruments for deep renovation
Result Relates Immediate effect Replication potential
to actions of project
Deep renovation policy improvement A1.1- 10-15 regulative Whole Estonia
(financial measures regulation, A1.5 acts improved
coherence between sectoral C1.1
regulations etc)
Efficient stakeholder specific financial A1.3- 6-10 financial Whole Estonia
instruments developed/improved and A1.5 models
implemented as complementary to
finance deep renovations during and
after the project
Complementary:
Processing (managing payments, internal monitoring, gathering data) the existing financial schemes (6
instruments), further use of complementary tbd by full proposal.
WP2: Development of building and stakeholder type specific technical solutions and guidelines to
streamline the renovation
Result Relates Immediate effect Replication potential
to actions of project
Technical solutions for deep A2.1, 4 sets of building ~ 100,000 detached houses (14 million
renovations (considering also results A2.2 type specific m²)
from WP4 and WP5) with demo guidelines ~14,000 apartment buildings (18 million
designs m²)
~27,000 non-residential buildings (of 22
detached and terraced houses, million m²)
apartment buildings, corporate and ~5,300 historical monuments, ~ 10,000
public buildings, and valuable building in milieu valuable areas.
historical buildings
Development of guidelines for A2.3 1 guideline
greening buildings during renovations
Advancement of prefabricated A2.4 3 reports ~ 7,000 apartment buildings (9 million
renovation solutions m²)
~ 3000 public buildings (3 million m²)
Compilation and publishing renovation E2.1 20-50 charts ~ 100,000 detached houses (14 million
info-charts m²)
~ 5,000 apartment buildings (6 million
m²)
Training materials for professional E2.2 10 training 20 000 specialists / workers in
builders programs, construction sector involved with
guideline renovation
Stakeholder specific examples for E2.3 4 sets of building ~ 100,000 detached houses (14 million
technical terms of reference type specific m²)
guidelines ~ 14,000 apartment buildings (18
million m²)
~ 27,000 non-residential buildings (of
22 million m²)
~ 5,300 historical monuments, ~ 10,000
building in milieu valuable areas.
Complementary:
Best practices related to technical solutions for renovation developed externally in separate research and
innovation projects (10 technical reports). Further use of complementary tbd by full proposal.
WP3: Renovation showcase: pilots, demos, and best-practices buildings
Result Relates Immediate effect Replication potential
to actions of project
Preparation (permits, agreements A3.1- 30-40 buildings ~ 100,000 detached houses (14 million
etc), technical designs A3.3 prepared for m²)
renovation (project ~ 14,000 apartment buildings (18 million
+ complementary) m²)
25
Renovated buildings C3.1 10-20 buildings ~ 27,000 non-residential buildings (of 22
C3.2 renovated in million m²)
innovative way ~ 5,300 historical monuments, ~ 10,000
building in milieu valuable areas.
Complementary:
Pilot renovations immediately prepared by IP:
• District level deep renovation of multistorey buildings: 1-2 city blocks;
• Improvement of energy performance of historical buildings, street-level approach: 1 street;
• Piloting cooperation models and business solutions: 5-10 buildings.
Deep renovation carried out for >8000 buildings;
Further use of complementary tbd by full proposal.
Sub-target 2:
ESTABLISH CLIMATE RISK EVALUATION CRITERIA FOR DEEP
RENOVATION
WP4: Modelling climate risks, adopting the results in renovation standards and regulations and testing
smart adaption solutions
Result Relates Immediate effect Replication potential
to actions of project
Specific climate models and A4.1 4-6 task specific Whole Estonia (new buildings and
computing parameters for buildings models renovations);
eg hygrothermal performance of buildings
(1), indoor climate (1-2), energy efficiency Selection methods are replicable in all
(1), service systems (1-2), material countries in cold climate region
resilience (1)
Technical solutions for addressing A4.2, 5-7 construction Whole Estonia (new buildings and
climate risks for buildings developed C4.1 standards renovations)
improved based
on renewed
computing
parameters
Planning tool for urban stormwater A4.3 1 GIS-integrated Whole Estonia (urban settlements with
control and prevention tool UDS)
The tool applied will be replicable in
urban areas with temperate climate;
Piloting the real-time control systems C4.2 1-3 pilot sites Whole Estonia (urban settlements with
(MPC; RBC) for smart and cost- UDS)
efficient flood control
Improvement of national urban flood C4.3 1-2 regulative acts Whole Estonia
policy and planning tools improved
1 Guideline for Guideline developed will be replicable in
urban stormwater urban areas with temperate climate;
management
improved
Complementary:
Smart solutions for urban stormwater management replicated in other regions (3-5 projects). Further use of
complementary tbd by full proposal.
Sub-target 3:
APPLY RESOURCE EFFICIENCY AND CIRCULARITY PRINCIPLES
FOR RENOVATION
WP5: Advancing resource efficiency and circular solutions for renovation
Result Relates Immediate effect Replication potential
to actions of project
National building type specific A5.1 1 regulative act Whole Estonia (new buildings and
methodologies for carbon footprint C5.1 (established/impro renovations)
assessment applied in regulation ved)
Developing national roadmap based A5.2 1 approved Whole Estonia (new buildings and
on Sustainable Built Environment roadmap renovations)
Strategy
Circularity, reuse, and recycling A5.3 1 report Reuse, recycling, and circular use of
potential assessment report for >70% materials of renovated buildings,
demolished buildings 0.9 mil. tons / year.
Export potential to other countries
26
Market uptake of circularity, reuse, A5.4 1 – 3 end of waste 0.9 mil. Tons construction waste / year
and recycling solutions of construction criteria improved; reduced in renovations carried out in
waste 1 procurement Estonia
guidelines
Circularity, reuse, and recycling pilots A5.5, 5 educational Export potential to other countries
& demos C5.2 pavilions
1-3 – pilot building
Complementary:
Measures engaged and developed to implement national sustainable built environment roadmap (tbd during
project). Operation of EKÜL competence centre for circular use of building waste. Further use of complementary
tbd by full proposal.
Sub-target 4:
ADVANCE DIGITAL TECHNOLOGIES
WP6: Smart renovation tools
Result Relates Immediate effect Replication potential
to actions of project
Smart readiness indicator toolset for A6.1 1 report ~ 100,000 detached houses (14 million
renovations 3-5 building m²)
specific designs ~ 14,000 apartment buildings (18 million
for C3.1 buildings m²)
~ 27,000 non-residential buildings (of 22
million m²)
~ 5,300 historical monuments, ~ 10,000
building in milieu valuable areas.
Performance-based energy use A6.2 1 report All buildings heated by electricity and/or
monitoring system for buildings C6.2 1 monitoring district heating
module
E-construction web platform A6.3, 1 platform Whole Estonia (new buildings and
development for renovations C6.1 renovations)
Export potential to other countries
Carbon footprint Building Information C6.2 1 set of resources Whole Estonia (new buildings and
Modelling (BIM) resources (“Green renovations)
BIM”); Export potential to other countries
Stakeholder based digital tools for A6.3, 5-10 different Whole Estonia (new buildings and
building owners: incl building type C6.4 tools; renovations)
specific energy performance
calculators (private, business, Export potential to other countries
apartment buildings); renovation
planning tools for residential buildings
(apartment buildings and private
houses); energy performance
monitoring tools for municipal real-
estate.
Visualization tools for building energy E6.1 1 web application Whole Estonia (new buildings and
performance combining digital twins renovations): services related to real-
for motivating investments developed estate, insurance, etc
Export potential to other countries
Complementary:
Advanced digital twin of Estonian building stock (incl relevant datasets of networks etc). Advanced e-construction
platform. Established digital twin of Estonian urban stormwater drainage (USD). Further use of complementary tbd
by full proposal.
Sub-target 5:
INCREASE CAPACITY OF RELEVANT STAKEHOLDERS AND AGGREGATING
DEMAND
WP7: Increasing competences of renovation
Result Relates Immediate effect Replication potential
to actions of project
Renovation consultants cluster A7.1- Increased Regional consultancies may be involved
A7.2 capacities and to the competence cluster.
synergies on
renovation policy
implementation
27
across sectors
and stakeholders
Improved procurement documentation A7.3 10-30 - Demo All public building stock
procurements
prepared
Training of key stakeholders E7.1 50 expert/year 20 000 specialists / workers in
construction sector involved with
renovation
Renovation innovations competition E7.2 Innovation Whole Estonia (new buildings and
competition (3-5 renovations)
times) Export potential to other countries
Complementary:
MKM initiatives on long-term view to construction policy; Development of vocational education programmes.
Advancement of renovation skills in construction vocational education (tbd). Further use of complementary tbd by
full proposal.
WP8: Aggregation of demand
Result Relates Immediate effect Replication potential
to actions of project
Cross-media campaigns to raise E8.1- 2000 building ~ 100,000 detached houses (14 million
awareness on the renovation policy E8.2 owners reached m²)
among key target groups via project / year ~ 14,000 apartment buildings (18 million
m²)
min 10 000 people ~ 27,000 non-residential buildings (of 22
reached / year million m²)
~ 5,300 historical monuments, ~ 10,000
building in milieu valuable areas.
Complementary:
MKM initiatives on long-term view to construction policy; Development of vocational education programmes.
Further use of complementary tbd by full proposal.
WP9: Project management
Result Relates Immediate effect Replication potential
to actions of project
Project management wiki A9.1 1 members-only Not relevant
section in web
Internal project management A9.2 3-5 guidelines Not relevant
guidelines for beneficiaries, incl: developed
• communication strategy;
• tuned monitoring program;
• transferability and replication
strategy.
KPI monitoring D9.1 4 reports Not relevant
Complementary monitoring D9.2 4 reports Not relevant
Project communication E9.1 1 webpage Not relevant
1 Laymans report
20-30 info boards
Tbd
Project networking E9.2 10-15 visits to Not relevant
similar project;
10-30 guest tours
accepted
Grant management F.1 3 progress Not relevant
reports;
1 final report;
Project audits;
Overall
coordination
Engagement of additional F.2 5-10 projects Not relevant
complementary funding
28
5. Expected contribution to the implementation of the target
plan/strategy
LIFE IP BUILDEST is a crucial tool for calibrating the implementation of the Estonian long-term
renovation strategy (LTRS) and create positive impacts to economy and environment (figure 6).
The project consortium initiatives will be tuned to maximize the joint effort across sectors to achieve the
planned renovation depth and rate. Also, the coordinated framework established by LIFE IP BUILDEST
is expected to efficiently use already reserved finances and generate new funding for the LTRS
implementation.
The LIFE IP BUILDEST will augment the renovation with digital advancements, capacity building,
knowledge-based decisions and processes, cross-cutting synergies. Development of demonstration
objects as well as testing pilots and awareness raising are needed to accelerate demand.
LTRS is ambitious and sets high aims in achieving an energy efficient building stock in Estonia, but it
lacks operational context and clear roadmap. LIFE IP BUILDEST will promote the adaptivity of LTRS,
by developing the long-term operational plan for achieving goals set in the strategy. The short-term
operational plan is to be submitted with the full proposal.
During the project, the funds of IP and complimentary will aim to implement 25% of the LTRS, but the
project will lay out the path for the full implementation as it will solve the main obstacles hindering the
process. In addition, actions of LIFE IP BUILDEST contribute to the implementation of other national
strategies and roadmaps such as NECP, NAS, SECAPs etc.
LIFE IP BUILDEST is expected to use both LIFE IP project funding as well as a variety of complementary
funding to achieve the aims of LTRS.
Figure 6 A capacity building oriented LIFE IP BUILDEST project will direct the national policy, provide necessary toolset and
establish necessary examples for smooth and steady growth of renovation rate to achieve the necessary target without minimal
negative impacts.
6. Main stakeholders involved in the project:
PROJECT BENEFICIARIES
Project beneficiaries are expected to be involved in the implementation of the project actions (exact role
is to be determined by full proposal).
29
Present consortium consists of the organizations, which play a key role in coordinating the
implementation of LTRS. The ministries (MKM, RaM, KeM) involved in the project direct the
policymaking in the sector, state agencies (KredEx, KIK, RKAS) apply the respective policy in practice.
The involved NGO-s 1) represent the construction markets supply side (EEL) and will spread the project
results to the sector, while also influencing the policymaking by their practical insights; 2) represent the
renovation demand and participate in development of socially responsible policy (EKÜL – apartment
buildings, MARK – detached houses and rural architecture); 3) represent the circular building industry
(ERMEL) and provide the sectoral know-how to the resource efficient renovation sub-theme. Research
institutions involved to the project represent the top Estonian Universities (TalTech and EKA) in the field
of building engineering, architecture, and cultural heritage in the built environment and climate
modelling. Local municipalities selected to the project as beneficiaries all act as renovation leaders in
Estonia (having previous replicable experiences in coordination of renovation). See each beneficiaries’
specific competences described below.
Project consortium is co-operation oriented and has good experiences with working with expert networks
expected to be engaged via direct consultations, revision panels and thematic think-tanks. Also, all the
project consortium members have previous experiences in participating in EU projects and have proven
as reliable partners. The involvement of beneficiaries to the work-packages of different sub-targets of
the project is preliminarily explained in Annex II, figure II-2.
Ministries
Name of the associated beneficiary (2): MINISTY OF FINANCE (RaM)
The area of government of the Ministry of Finance includes planning and implementation of the
budgetary, resource management, tax, and financial policies of the state.
In LIFE IP BUILDEST RaM is expected to participate in the development, piloting and testing of policy
instruments for renovation wave in Estonia.
Name of the associated beneficiary (3): MINISTRY OF ENVIRONMENT (KeM)
The area of government of the KeM includes: organising of national environmental and nature
protection, organising the use, protection, re-production and accounting for natural resources,
performing tasks related to decrease of climate change, environmental supervision, /…/, organising
the use of external tools for environmental protection, as well as compiling strategic documents and
draft legislation. In LIFE IP BUILDEST KeM is expected to be responsible for participating in
advancement of climate adaption of built environment and resource efficiency of renovations.
State subordinated organizations
Name of the associated beneficiary (4): FOUNDATION KREDEX (KredEx)
KredEx is a foundation set up by the Ministry of Economic Affairs and Communications with the aim of
providing financial solutions for implementing national policies. For companies, KredEx offers loans,
venture capital, credit insurance and state-backed guarantees for faster development and safe
expansion into foreign markets. For private individuals and apartment associations, KredEx offers state-
backed guarantees and grants for purchasing dwellings and improving their energy efficiency. In LIFE
IP BUILDEST KredEx is expected to be responsible for: Development of financial motivation schemes
and measures for implementation of LTRS; Advancement of the consultation service for building owners
and competence centre; Replicating the project results with complementary funding; etc.
Name of the associated beneficiary (5): ENVIRONMENTAL INVESTMENTS CENTRE (KIK)
KIK is a foundation subordinated by Ministry of Environment of Estonia. It acts as one of the main
financiers of environmental projects in Estonia. In LIFE IP BUILDEST project KIK is expected to be
responsible for: Establishing links of LTRS implementation to Estonian smart and climate resilient city
initiatives; Advancing motivation schemes for deep renovations; Participating in the circular building
interventions; Contributing thematic complementary funding (field of circular building; energy networks).
Name of the associated beneficiary (6): STATE REAL ESTATE Ltd (RKAS)
RKAS is a real estate development and management company established for the efficient management
of state real estate in 2001. The company is 100% owned by the Republic of Estonia and its shares are
controlled by the Ministry of Finance. In LIFE IP BUILDEST RKAS is expected to be responsible for:
Developing and carrying out pilot renovations; Demonstrating best practices with complementary
30
initiatives; Development and showcasing digital tools and technologies; Leading the renovation process
among municipalities and providing necessary competences (procurements etc).
Research institutions
Name of the associated beneficiary (7): TALLINN UNIVERSITY OF TECHNOLOGY (TalTech)
TalTech, the only university of technology in Estonia, is the flagship of Estonian engineering and
technology education. In LIFE IP BUILDEST TalTech is expected to be responsible the technical
competence in the project implementation, including: Renovation technical knowledge: deep
renovations of different buildings, energy performance of buildings; building physics, building structures,
climate modelling and mitigation the climate risks in built environment, civil engineering for circular
buildings etc; Preparing the interventions, monitoring project results and offering expert knowledge for
dissemination of project results.
Name of the associated beneficiary (8): ESTONIAN ACADEMY OF ARTS (EKA)
Estonian Academy of Arts is the only public university in Estonia providing higher education in fine arts,
design, architecture, media, visual studies, art history, and conservation. In LIFE IP BUILDEST EKA is
expected to be responsible the technical competence in the project implementation, including:
Renovation technical knowledge on historical buildings, architectural design favouring circularity and
energy efficiency of buildings etc; Preparing the interventions, monitoring project results, and offering
expert knowledge for dissemination of project results.
Local municipalities
In LIFE IP BUILDEST project local municipalities acting as lighthouse towns are the renovation leaders
and will replicate its experiences to other local municipalities that will participate the project as external
stakeholders. The listed municipalities are expected to host several concrete actions, whereas the
municipalities will each lead different scalable cooperation models, exact roles tbd by full proposal.
Name of the associated beneficiary (9): Tallinn City Government (Tallinn)
Tallinn being the largest city and capital of Estonia is an important leader in terms of climate ambition
initiatives.
Name of the associated beneficiary (10): Tartu City Government (Tartu)
Represents the large settlements of Estonia. Tartu aims to drive district level deep renovation initiative
for multi-storey apartment buildings and participate in the initiatives developed for detached buildings
and push forward the renovation of public buildings.
Name of the associated beneficiary (11): Rakvere Town Government (Rakvere)
Represents the medium sized growing settlements. Rakvere aims to advance the energy performance
oriented renovation of historical buildings and smart solutions to control urban floods.
Name of the associated beneficiary (12): Võru Town Government (Võru)
Represents the medium sized declining settlements. Võru will lead the change for small apartment
buildings and detached houses and propose circular solutions for renovations to be used in declining
municipalities.
NGO’s
Name of the associated beneficiary (13): The Estonian Union of Co-operative Housing
Associations (EKYL)
EKYL is an independent non-profit working across Estonia to support apartment associations and to
represent their interests on local, national and international level. The Union has more than 1400
members (apartment associations). In LIFE IP BUILDEST EKYL is expected to be responsible (exact
role is to be determined by full proposal) for: Aggregating demand among its members, enforcing and
consulting the low performing housing associations; Developing digital tools for energy efficiency in
performance of apartment building and their maintenance.
Name of the associated beneficiary (14): Centre of Rural Architecture (MARK)
31
Centre of Rural Architecture (MARK) is a department of the Estonian Open-Air Museum. Its main
activities include researching Estonian vernacular rural architecture and landscapes, organizing
practical trainings, seminars and public events, co-ordinating house counsellors´ network. In LIFE IP
BUILDEST MARK is expected to be responsible for: Aggregating demand among the owners of
historical buildings and promote the use of solutions developed within the project; Participating in the
process of developing technical guidelines for renovations.
Name of the associated beneficiary (15): Estonian Association of Construction Entrepreneurs
(EEEL)
EEEL is a voluntary association of construction enterprises created to support and co-ordinate its
members actions in matter of industry related economic issues and relations with employees and
employee unions. In LIFE IP BUILDEST EEEL is expected to be responsible for Representing
construction companies in policy development; Informing construction companies, campaigning about
renovation policies.
Name of the associated beneficiary (16): Estonian Circular Economy Industries Association
(ERMEL)
Estonian Circular Economy Industries Association (ERMEL) was established in 1996 as non – profit
association by 26 waste management companies. ERMEL has 30 members (majority private waste
management companies). ERMEL is a member of FEAD (European Federation of Waste Management
and Environmental Services) since 2008. In LIFE IP BUILDEST EJKL is expected to be responsible for:
Development of circularity of buildings, advancement of best practices for typical buildings and materials
demolished in renovations; Participating in awareness raising.
32
TABLE 1: Most relevant Stakeholder groups planned to be engaged with the project
Organization Field of expertise Type of involvement
Specific technical experiences, eg
Association of Architects; Association of Civil
Engineers; Woodhouse Association;
Association of Construction Material Cooperation (meetings, consultations)
Producers; Society of Heating and Ventilation needed for improvement of technical
PROFESSIONAL Engineers; Union of Roofers and Facade solutions and disseminating them via
ASSOCIATIONS OF Makers; Association of Architectural and guidelines. In some field’s involvement is
EXPERTS Consulting Engineering Companies etc needed also as external expertise.
PROFESSIONAL
ASSOCIATIONS Cooperation (meetings, consultations)
AND CLUSTERS OF needed for improvement of technical
REAL ESTATE Market know-how on corporate and residential solutions and disseminating them via
ENTREPRENEURS real-estate market, renovation interest etc guidelines
Cooperation (meetings, consultations)
Market know-how on renovation supply, needed for improvement of technical
CONSTRUCTION market-demand, potential for the innovations to solutions and disseminating them via
COMPANIES be adopted by the market guidelines.
Expertise on resource efficient and energy Cooperation (meetings, consultations) is
performance-oriented renovation. foreseen in the field of developing
Different fields of expertise: Stockholm renovation guidelines, sustainable
Environmental Institute Tallinn, University of building roadmap etc. In some field’s
RESEARCH, Tartu, Technopolis consult, Municipal Energy involvement is needed also as external
SCIENCE Agencies, Tallinn Technical School etc expertise.
Cooperation (meetings, consultations) is
ASSOCIATION OF foreseen in the field of developing
ESTONIAN CITIES Involvement of local municipalities and raising renovation guidelines, sustainable
AND their capacities on coordinating deep building roadmap etc. Potential
MUNICIPALITIES renovation beneficiary tbd by full proposal.
Cooperation (meetings, consultations) is
Renovation of historical buildings: state foreseen with the national cross-sectoral
MINISTRY OF initiatives, regulation; Spatial Design Expert Group, renovation
CULTURE Spatial Design coordination of heritage buildings etc
Renovation of historical buildings: expertise on
specific requirements for pilot buildings, Cooperation (meetings, consultations) is
NATIONAL expertise for the guidelines, replication of foreseen in the field of renovation of
HERITAGE BOARD guidelines; heritage buildings;
ESTONIAN Possibly engaged as external
ENVIRONMENTAL Assessing the possibilities to reducing consultant, or involved as beneficiary by
LAW CENTER renovation impact on environment by the full proposal if proves necessary and
(EELC): improvement of legislation can be agreed;
Synergies with renovation and green
ENTERPRISE Expertise on entrepreneurship grants available, recovery and innovation procurements,
ESTONIA (EAS): developing procurement innovations etc cooperation (meetings, consultations)
THE CONSUMER Cooperation (meetings, consultations) is
PROTECTION AND foreseen in the field of developing
TECHNICAL renovation guidelines. Also, practical
REGULATORY Expertise on market regulation and technical cooperation is needed on the renovation
AUTHORITY (TTJA): requirements in the construction sector showcase buildings.
MEDIA CHANNELS Dissemination of project results to wider public.
SPECIALIZED ON Promoting the project outputs and progress. Cooperation in implementing the
CONSTRUCTION ehitusuudised.ee, TV program “Nurgakivi”, communication plan developed within
ISSUES building related annexes of main newspapers the project.
Transferring existing best practices to Estonia,
replication of the experience gained via IP
BUILDEST to other EU countries.
EU LEVEL Housing Europe, BuildUp platform, eu.ESCO,
PROFESSIONAL European Association of Energy Service
NETWORKS Companies etc Experience exchange
EU Policy on renovation (and the impacted Experience exchange. Contributing to
EU AGENCIES sectors) EE policymaking, reporting etc.
EASME, EEIG Communication on grant management:
NEEMO LIFE regulation, Grant management etc reporting, monitoring, consultations
33
The table above does not represent a complete list of stakeholders and is to be elaborated by Full
Proposal. Significant stakeholders influencing the LTRS thematically and contributing relevant know-
how are to be involved as external stakeholders (see thematic involvement also on figure 7).
TARGET AUDIENCE
Project dissemination is targeted to the following audience:
• Owners of private residential buildings: cross media campaign explaining the need and
introducing possible solutions is foreseen. The campaign involves on site events, social media
campaign, pitches in traditional media, dissemination of renovation info-charts etc;
• Cooperative housing associations management: the target group is aimed to be reached with
info events, direct consultation with low performing owners associations, mentoring program;
• Owners of corporate buildings: real-estate fairs, establishment of consultant network, direct
consultation with real-estate management companies etc;
• Individual experts (architects, engineers, local municipality officials – construction, waste,
planning etc), Construction, engineering and architecture students: organizing and participating
thematic professional seminars, conferences, training programs, publishing project results in
scientific and professional journals and info-channels;
• General public – exhibitions, general media work (appearance in TV; magazines and
newspapers etc).
7. Long term sustainability (including capacity building,
replication and transfer):
The strategy foresees the need to renovate ~100 000 private residential buildings with the total area of
14 mln m², 14 000 apartment buildings with the total area of 18 mln m² and 27 000 non-residential
(corporate and public) buildings with the total area of 22 mln m². LTRS has indicated without clear
intervention it is expected that about 80% of the private residential, 68% of the apartment buildings and
60% of the non-residential buildings would not be renovated. The present project aims to develop
needed mechanisms to pave the way towards full implementation of LTRS and engage needed funds
to mainstream the renovation across country.
The LIFE IP BUILDEST project includes measures, which have a substantial effect for guiding the
renovation towards a knowledge based, industrially scalable and efficiency-oriented nation-wide
renovation program.
Key factors of success to achieve long term sustainability:
• Project involves key authorities influencing renovation policy in Estonia: Main stakeholders
responsible for the implementation of LTRS will be participating the project as beneficiaries and
contributing the competences and available funds to achieve the successful full implementation
of LTRS also after the project is completed. Project is planned and implemented in a high-level
steering of 3 ministries: MKM, KeM and RaM. The project consortium includes state and private
entities and both authorities active in relevant policymaking, as well as representatives of
demand and supply chain.
• Project sets a significant focus on the measures oriented for capacity building: developing
stakeholder specific guidelines for different building types, development of national standards
and improving regulation (national and regional legislation, both on financial measures as well
as requirements level), training of experts and providing them the necessary digital tools to
fasten the processes and improve the needed services, developing financial models and
subsidy schemes;
• Project will be establishing demonstration and best-practice showcase, development and
testing of pilots to prove that the renovation solutions are tangible and provide evident effect for
the owners. The project aims to develop renovation best practices that are easily scalable
across the whole country and have replication potential also in other countries – these are
prefabricated offsite renovation of large, multi-storey buildings (apartment buildings, public
houses etc), energy efficient conservation of historic buildings, climate resilient solutions for
typical building envelopes, climate adaption solutions for technical systems, circular renovation
34
possibilities (NB design for future disassembly) and adopting certified reused/recycled
materials;
• Best practices developed within the project can be prolonged for the full implementation of LTRS
and engaged complementary measures (presently available as well as planned) guarantee the
necessary funding.
• Project will engage additional complementary funding (funds from EU budget period 2021-2027
and beyond, also national funding and private investments).
• Project will improve the national long-term renovation strategy and develop a long-term feasible
operational plan for LTRS.
• Project beneficiaries will commit to the dissemination of project results after the project.
The vision of achieved impact after LIFE IP BUILDEST
Building owners are informed about the need for deep renovation and have access to the information
about the financial and technical solutions how to retrofit their properties into highly energy efficient
buildings.
Funding mechanisms for full implementation of LTRS are in place, procedures are rational, processes
smooth and requirements made understandable and accessible for the stakeholders. Developed
measures consider social and regional differences and different financial capacities.
Standardized technical solutions used in renovations ensure safer, climate resilient and more
environmentally friendly building stock.
Entrepreneurs offering renovation solutions have adopted the innovative sustainability and climate
resilience oriented technical solutions.
Agencies responsible for implementing LTRS have needed tools (guidelines, databases, smart
applications etc).
8. Expected major constraints and risks of the:
Renovations are grant dependant
Relevance IP/Complementary: specific to complementary
Risk level: high
Actions affected: work-package 1
Description: Present process of preparing the LTRS has shown that Estonian construction market, real-
estate situation and energy pricing policies do not motivate owners to renovate unless grants cover
significant share of the needed investment.
Solution: Project aims to develop business models, innovative financing schemes and motivations other
than grants that should develop market-based initiative for renovation.
Renovation will generate massive amounts of construction waste and produce negative environmental
impact possibly larger than the benefit gained from improvement of energy performance (during and
after the LIFE IP)
Relevance IP/Complementary: Affects IP & Complementary
Risk level: high
Actions affected: work-package 5
Description: When not considering the environmental impacts of the renovation, the increased use of
embodied energy of buildings, waste of materials, need for extraction of virgin materials all will affect
public perception towards renovation and reduce owners willingness to carry out the needed deep-
renovations in expense of using increased amounts of energy.
Solution: Project will advance circular building concept and adopt carbon footprint concept for building
regulation, which will aim to reduce the negative environmental impacts of the renovation initiative.
“Siloed” policies
Relevance IP/Complementary: Affects IP & Complementary
Risk level: medium
35
Actions affected: all
Description: Main responsibility in implementing LTRS lays in the jurisdiction of Ministry of Economic
Affairs and Communications, still the success of the actuation and quality of the implementation depends
on the coherence of several policies (financial, environmental, educational etc).
Solution: Project capacity building activities as well as shared initiatives between different ministries and
their jurisdictions is expected to develop tuned operation also for wider success of LTRS, both during
project as well as follow-ups foreseen with After-life schemes.
Low initiative of owners
Relevance IP/Complementary: Affects IP & Complementary
Actions affected: all
Description: Low performing companies, local municipalities and also private owners with no interest in
carrying out deep renovations hinder the needed improvement of Estonian building sock energy
performance, even if there are solutions available in the market to help finance the needed investments.
Solution: Project will aim to increase demand, develop relevant regulations, financial schemes and
promote good examples that is expected impel also the low performing owners.
Coordination challenges
Relevance IP/Complementary: Specific to IP
Risk level: medium
Actions affected: all
Description: Project actions are not independent sub-projects, but interlinked system of mechanisms
that should be developed in coordination, to achieve best results (renovation guidelines, technical
solutions (industrialization/climate resilience solutions etc), policy mechanisms, climate modelling,
circular building concept etc).
Solution: Good planning, communication and coordination is needed for the development intertwined
mechanisms, which is considered already presently while negotiating potential content, timeframe, and
volume of planned project actions.
Long-term commitment to 8-year project (policy risk)
Relevance IP/Complementary: Specific to IP
Risk level: low
Actions affected: all
Description: Project duration exceeds the regular 4-year state budget planning timeframe. For the
development of financial plan of the project and reserving the needed own contribution, exemptions are
required.
Solution: Project development is carried out in close coordination of high-level steering of relevant state
authorities, ensuring the necessary financial commitment to the project.
Long-term commitment to Full implementation of LTRS (political risk)
Relevance IP/Complementary: Affects IP & Complementary
Risk level: low
Actions affected: all
Description: Long-term commitment to a strategy aiming the ambitious improvement of energy
performance of Estonian building stock can be hindered by different oriented political interest.
Solution: Project development is carried out in close coordination of high-level steering of relevant state
authorities, ensuring the necessary financial commitment to the project. Involvement of relevant
stakeholders (EU and national) keeps the priority of the initiative.
Administrational challenges
Relevance IP/Complementary: Specific to IP
Risk level: low
Actions affected: all
Description: LIFE IP project management is a resource demanding joint effort of project beneficiaries.
Inexperienced and uncommitted staff can undermine the project overall effect.
Solution: Voluminous LIFE project coordination is carefully planned during proposal preparation to
provide possibilities for good communication and coherence of operation between project beneficiaries,
experts, stakeholders, and general public. Project will develop administrational guidelines (project
management wiki, communication strategy, replication plan etc) for project beneficiaries to be followed
36
for successful project management. All project beneficiaries are competent and skilled with
implementation of international projects.
Long-term sustainability of the project actions
Relevance IP/Complementary: Specific to IP
Risk level: low
Actions affected: all
Description: If the project should remain as a collection of single actions with no established connections
to the wider policy and continuity via complementary measures in the future, it would diminish the effect
of the project.
Solution: We have addressed the sustainability already in the current phase of project development via
action development towards wide implementation of best practices: we will use and develop best
practices, educate key stakeholders, deliver improved policy and ensure that best practices for
renovation are reasoned and worth of being continued and full implementation of LTRS is achieved.
9. a) Is your project significantly climate related? Yes X No
b) Is your project significantly biodiversity-related? Yes No X
If you consider your project to be significantly climate or biodiversity-related (you marked 'yes'),
please explain why:
The building sector is the largest single energy consumer in Estonia, as also in Europe general. The
operation of buildings is responsible for 36% of the EU’s carbon dioxide (CO₂) emissions a key
greenhouse gas (GHG) that is causing planetary warming and climate change. The GHG emissions
from material extraction, manufacturing of construction products, and the construction and renovation
of buildings are estimated at between 5-12% of total national GHG emission. Full implementation of
LTRS that the current LIFE IP BUILDEST project will target helps to reduce the CO ₂ emissions in
housing stock up to 90%.
LIFE IP BUILDEST aims to reduce wider environmental impact of renovation. It does not specifically
focus on reducing biodiversity loss related to the renovation but consider the impact in guidelines and
raise the public awareness on the issue. The project will propose possibilities to adopt green building
solutions in renovations (green roofs, green walls etc) and develop guidelines how to handle biodiversity
related issues in renovations (human settlement dependent wildlife – bats, birds etc, including Natura
2000 species listed in the directives 2009/147/EC and 92/43/EEC).
37
LIFE Integrated Projects 2020 - CNe
MAP OF THE GENERAL LOCATION OF THE PROJECT AREA(S) IN THE
COUNTRY/REGION
Figure 7: The LIFE IP BUILDEST project will tackle the whole Estonia as the project site. Demo and Pilot sites are
to be developed mainly in selected partner towns (lighthouse towns have marked with LIFE flag), which operate as
centres of excellence in terms of leading deep renovation of buildings and implementing LTRS. Concrete actions
that base on the best practices of the project and are funded by complementary funding are to be implemented in
whole Estonia.
The project has included renovation motivated municipalities as beneficiaries from different types of
regions. Tallinn as the national capital and the largest city in Estonia, Tartu as an excellent
representative of a large growing town, Rakvere as a representative of a small growing town and Võru
as a representative of a small shrinking town. Cities and towns engaged as project beneficiaries are
expected to act as renovation leaders in Estonia, representing different sized municipalities with unique
competences that can be replicated to the whole Estonia. Other local municipalities will be included to
the project as key stakeholders, to learn from the project experiences and initiate renovations with the
available complementary funding.
38
LIFE Integrated Projects 2020 – CNf
Financial Plan
Sources of financing Actions/ Amount of Status/date of Authority/
measures to funding Funding entity managing
be financed (EUR) granted/ the fund
to be granted/
not yet requested
LIFE PROJECT:
EU contribution NA 11 520 000 NA NA
Contribution by NA 7 680 000 NA NA
beneficiaries
Contribution by cofinancers 0
TOTAL LIFE IP 19 200 000
EU FUNDS:
H2020: Drive0 - WP 5 100 000 Granted, H2020 / TalTech
Driving decarbonization of the 01.10.2019
EU building stock by
enhancing a consumer
centred and locally based
circular renovation process
H2020: FINEST TWINS WP 3; WP 6 1 000 000 Granted, H2020 / TalTech
Establishment of Smart City 01.12.2019
Center of Excellence
H2020: U-CERT - WP 6 40 000 Granted H2020 / TalTech
Towards a new generation of 01.09.2019
user-centred Energy
Performance Assessment and
Certification; facilitated and
empowered by the EPB
Center
H2020: CityxChange Positive WP 3; WP 6 500 000 Granted, H2020 / Võru
City ExChange 1.11.2018
H2020: SHEERenov – WP 5 120 000 Granted, H2020 / EKYL
Seamless services for 1.06.2020
Housing Energy Efficiency
Renovation
H2020: POWERPOOR - WP 2 100 000 Granted, H2020 / EKYL
Empowering Energy Poor WP8 1.09.2020
Citizens through Energy
Cooperative Initiatives
H2020: EnergyTakeaway - WP 2 170 000 Requested, 2020 H2020 / EKYL
Enabling and Supporting WP 7
Householders to Tackle
Energy Poverty
H2020: WE NERGY - Living WP 7 130 000 Requested, 2020 H2020 / EKYL
Labs for Consumer WP 8
Empowerment and
Collectively Driven Energy
Actions
H2020: SMART FINANCE WP 1 160 000 Requested, 2020 H2020 / EKYL
EST – Estonian National WP 8
Roundtable to Implement
Smart Financing for Smart
Buildings
H2020: VIRTUOUS – WP 2 70 000 Requested, 2020 H2020 / EKYL
Virtualization of Buildings, WP 6
Prosumers and Users for
Improved Comfort and
Efficiency
39
H2020: TraiNBS - Transition WP 4 200 000 Requested, 2020 H2020 / TalTech
Route to Achieve Integrated
Nature Based Solutions for
water quality improvement
across urban water cycles
TOTAL (eg. H2020) 2 590 000
Innovative solutions increase WP 1; WP3; 34 500 000 Funds approved for KIK
resource productivity of scheme,
enterprises**
Innovative solutions increase WP 1; WP 3; Tbd* planned KIK
resource productivity of 145 000 000
enterprises **
KIK grant scheme for urban WP 4 14 500 000 Funds approved for KIK
flood management** scheme,
Total: Cohesion Policy Funds: 194 000 000
KredEx renovation grant for WP 1; WP 3; 366 000 000 planned KredEx
renovation of apartment
buildings**
Total: Recovery and 366 000 000
Resilience Facility
Interreg BSR: NOAH - WP 4 500 000 Granted, Interreg BSR / TalTech
Protecting Baltic Sea from 01.01.2019
untreated wastewater
spillages during flood events in
urban areas
Interreg BSR: WP 4 150 000 Granted, Interreg CB / TalTech
CleanStormwater - 01.02.2020
Testing new storm water
treatment solutions for
reduction of hazardous
substances and toxins inflows
into the Baltic Sea
TOTAL (eg. Interreg) 650 000
Subtotal EU: 563 240 000
OTHER FUNDS
ETAG: DEPART - WP 4 100 000 Granted, 1.01.2020 ETAG / TalTech
Decentralized real-time control
platform for urban drainage
systems in climate proof smart
cities
ETAG: PRG483 - Moisture WP 2 100 000 Granted, ETAG / TalTech
safety of interior insulation, 1.01.2019
constructional moisture and
thermally efficient building
envelope
SA Archimedes: TAR16012 - WP 2 1 000 000 Granted, SA Archimedes /
Zero energy and resource 01.10.2015 TalTech
efficient smart buildings and
districts
KIK scheme: renovation of WP 3; 1 000 000 Funds approved for KIK
housing affected by oil-shale scheme,
excavation
KredEx reconstruction grant WP 1; WP 3; 6 500 000 Funds approved for KredEx
for small residences scheme,
(2021-2024)**
KredEx renovation loan for WP 1; WP 3; 22 000 000 Funds approved for KredEx
apartment buildings (2021- scheme,
2024)**
KredEx support for home WP 1; WP 3; 16 000 000 Funds approved for KredEx
renovation for large families scheme,
(2021-2024)**
KredEx Housing loan WP 1; WP 3; 35 000 000 Funds approved for KredEx
guarantee (2021-2024)** scheme,
KredEx support schemes WP 1; WP 3; Tbd* planned KredEx
(2024-…) to be 1 500 000 000
40
developed/continued within
project**
Climate resilience, Renovation WP 4 Tbd* planned KIK
circularity schemes to be WP 5 500 000 000
developed within project**
Subtotal public: 2 046 700 000
KIK grant scheme for urban WP 4 1 388 888 Funds approved for KIK
flood management (Own scheme,
contribution of the investment
paid by applicants)
Innovative solutions increase WP 1; WP3; 281 470 588 planned KIK
resource productivity of
enterprises (Own contribution
of the investment paid by
applicants)
KredEx renovation grant for WP 1; WP 3; 366 000 000 planned KredEx
renovation of apartment
buildings (Own contribution
min 50% of the investment
paid by applicants)
KredEx reconstruction grant WP 1; WP 3; 26 000 000 planned KredEx
for small residences** (Own
contribution 80% of the
investment paid by applicants)
(2021-2024)
KredEx renovation loan WP 1; WP 3; 14 250 000 planned KredEx
warranty for apartement
buildings (Own contribution
80% of the investment paid by
applicants)
(2021-2024)
Subtotal private: 689 109 476
KredEx support schemes WP 1; WP 3; Tbd* planned KredEx (exact plans
(2024-…) to be 1 500 000 000 for financial period
developed/continued within 2021-2027 are
project (Own contribution min presently under
50% of the investment paid by negotiations, tbd by full
applicants) proposal)***
Climate resilience, Renovation WP 4 Tbd* planned KIK (exact plans for
circularity etc schemes to be WP 5 500 000 000 financial period 2021-
developed within project 2027 are presently
under negotiations, tbd
by full proposal)***
Cost-sharing financing WP 1; WP3; Tbd* planned Tbd*
services / cooperation models 50 000 000
developed within project for
deep renovations
Subtotal TBD* 2 050 000 000 planned Tbd*
International funds: 0
Total complementary: 4 771 559 476
Notes (if applicable):
Tbd* – project aims to develop financial schemes and business models that need to cover deep renovation of
Estonian housing stock for the project period (and beyond), present financial plan acknowledges the needed
funds, but has not secured the funding. Private, EU and national funds are to be considered.
** Schemes involved as complementary, which include grant funds and expected own contribution (listed under
private) from applicants;
*** Exact fianancial plans for budget period 2021-2027 are presently under negotiations, therefore financial plan of
the project will be elaborated by full proposal.
41
ANNEX 2
Figure II-1 Preliminary pert chart of the LIFE IP BUILDEST project
ANNEX 2
Figure II-2: Project management structure and the involvement of beneficiaries to the work packages under different sub-targets of the project
Executive Agency for Small and Medium Sized Enterprises (EASME)
LIFE Key Project Level Indicators
LIFE Call for Proposals 2020
At the end of the project
Please comment and give brief explainations of assumptions
used for the calculation.
Estimated Impact Estimated Impact
Objective Indicators
(absolute values) (in %)*
For all values below: the exact ambition will be developed by
Full Proposal
* Change expected (in %) compared to the initial situation. Please explain reference data used to set the initial situation.
This is normally directly linked to the baseline you have developed in the proposal.
Reduction of operational energy of buildings from 4.4 t/year on
CO2 1.4 mln tons 32 % change
2020
Reduction of
greenhouse gas Avoiding impacts of waste of embodied energy in buildings
emissions (GHG) (designing for circularity, long-term resilience to the climate risks,
CO2 0.2 mln tons / year 100% change
renovating instead on demolition and new construction). Saving
800 000 t/materials/year.
Emissions of primary TSP Decrease of heating need because of additional insulation and half
(total suspended particles) 6600 tons / year 43% change of detached houses install a heat pump as a heating source istead
from heating of stove.
Air quality and Decrease of heating need because of additional insulation and half
Emissions of primary
emissions 5100 tons / year 41% change of detached houses install a heat pump as a heating source istead
PM10 from heating
Improved Environmental and of stove.
Climate Performance (including Decrease of heating need because of additional insulation and half
Emissions of primary
resilience to climate change) 5000 tons / year 41% change of detached houses install a heat pump as a heating source istead
PM2.5 from heating
of stove.
Reuse, recycling and circular use of >70% materials of renovated
Waste Reduction 0.9 mil. tons / year 70%
buildings
Prevention: Renovation as is aims to waste reduction, using the
existing construction as much as possible rather than replacing it
Waste Reduction 1.1 mil. tons / year 70%
with a new building.
Waste management Exact ambition to be declared with Full Proposal
Long-term prevention: At least half of the renovations carried out,
will follow the design guidelines that aim for pure material flows in
Waste Reduction 0.1 mil. tons / year 90% change future dissassembly and design the materials used for renovations
for future circularity
Exact ambition to be declared with Full Proposal
20% of inhbitants
Improved resilience to More resilient renovations carried out taking into account the
Water living in flood risk 100% change
flooding increased flooding risks due the changed climate.
areas
Reduced resource Reuse, recycling and circular use of >70% materials of renovated
Raw materials 0.9 mil. tons / year 70%
consumption buildings
Reduced water Decrease of hot water consumption because of more effcient
Water 72000 m3 / year 5 % change
consumption systems
Better use of natural resources
Energy from Renewable
kwh / year % change
Energy Sources
Energy
Reduced energy
1.4 TWh / year 12 % change
consumption
Increase in the number of employees in construction companies
Employment Jobs created FTE % change
based on previous dynamics 2000 - 2007
N . of replication /
Replication / Transfer Transfer buildings 8 000 50% Whole Estonia
renovated
Full implementation of
Policy measures
LTRS taking into
Replication / Transfer developed with LIFE IP 100% Estonia
account LIFE IP
BUILDEST are continued
BUILDEST results
Economic Performance,
Market Uptake, Replication Disseminating toolset
Replication / Transfer developed within the 50% Latvia, Lithuania, Poland, Germany, Finland, Sweden
project
Expected revenues Euros not applicable
Market uptake market size in number of
customers not applicable
customers
Reduction of cost per
in Euros / unit % change
unit or process
capital invested / net
Payback Time in years not applicable
income
Number of owners
Awareness raising 2000 / year 50% change
reached/ made aware
Number of general public
Awareness raising 10 000 / year 50% change
reached/ made aware
Communication, dissemination, Number of projects
awareness rising reached/ made aware
Project networking 10-30 projects n/a Cooperation with different EU funded projects
(projects contacted,
visited, hosted)
Website Number of visits >100 000 n/a
Web tools developed
within project
Number of visits >100 000 n/a
integrated to different
web pages
BUILDEST_KPI Page 1 of 2
Executive Agency for Small and Medium Sized Enterprises (EASME)
LIFE Key Project Level Indicators
LIFE Call for Proposals 2020
3 or 5 years after the project Select → 3 years after the project
(5 years mandatory for Nature Projects)
Please comment and give brief explainations of assumptions
used for the calculation
Estimated Impact Estimated Impact
Objective Indicators
(absolute values) (in %)*
For all values below: the exact ambition will be developed by
Full Proposal
* Change expected (in %) compared to the initial situation. Please explain reference data used to set the initial situation.
This is normally directly linked to the baseline you have developed in the proposal.
Reduction of operational energy of buildings from 4.4 t/year on
CO2 2,1 mln tons 47 % change
2020 to 2 t/year on 2029
Reduction of
greenhouse gas Avoiding impacts of waste of embodied energy in buildings
emissions (GHG) CO2 0.8 tons / year % change (designing for circularity, long-term resilience to the climate risks,
renovating instead on demolition and new construction)
Emissions of primary TSP Decrease of heating need because of additional insulation and half
(total suspended particles) 5400 tons / year 41% change of detached houses install a heat pump as a heating source istead
from heating of stove.
Air quality and Decrease of heating need because of additional insulation and half
Emissions of primary
emissions 5100 tons / year 41% change of detached houses install a heat pump as a heating source istead
PM10 from heating
Improved Environmental and of stove.
Climate Performance (including Decrease of heating need because of additional insulation and half
Emissions of primary
resilience to climate change) 5000 tons / year 41% change of detached houses install a heat pump as a heating source istead
PM2.5 from heating
of stove.
Reuse, recycling and circular use of >70% materials of renovated
Waste Reduction 0.9 mil. tons / year 70%
buildings
Prevention: Renovation as is aims to waste reduction, using the
existing construction as much as possible rather than replacing it
Waste Reduction 1.1 mil. tons / year 70%
with a new building.
Waste management Exact ambition to be declared with Full Proposal
Long-term prevention: At least half of the renovations carried
out, will follow the design guidelines that aim for pure material
Waste Reduction 0.1 mil. tons / year 90% change flows in future dissassembly and design the materials used for
renovations for future circularity
Exact ambition to be declared with Full Proposal
20% of inhbitants
Improved resilience to More resilient renovations carried out taking into account the
Water living in flood risk 100% change
flooding increased flooding risks due the changed climate.
areas
Reduced resource Reuse, recycling and circular use of >70% materials of renovated
Raw materials 0.9 mil. tons / year 70%
consumption buildings
Reduced water Decrease of hot water consumption because of more effcient
Water 72000 m3 / year 5 % change
consumption systems
Better use of natural resources
Energy from Renewable
kwh / year % change
Energy Sources
Energy
Reduced energy
1.4 TWh / year 12 % change
consumption
Increase in the number of employees in construction companies
Employment Jobs created FTE % change
based on previous dynamics 2000 - 2007
N . of replication /
Replication / Transfer Transfer buildings 12 000 50% Whole Estonia
renovated
Full implementation of
Policy measures
LTRS taking into
Replication / Transfer developed with LIFE IP 100% Estonia
account LIFE IP
BUILDEST are continued
BUILDEST results
Economic Performance,
Market Uptake, Replication Disseminating toolset
Replication / Transfer developed within the 50% Latvia, Lithuania, Poland, Germany, Finland, Sweden
project
Expected revenues Euros not applicable
Market uptake market size in number of
customers not applicable
customers
Reduction of cost per
in Euros / unit % change
unit or process
capital invested / net
Payback Time in years not applicable
income
Number of owners
Awareness raising 1000 / year 50% change Will be continued by competence cluster
reached/ made aware
Number of general public
Awareness raising 3 000 / year 50% change Will be continued by competence cluster
reached/ made aware
Number of projects
reached/ made aware Project beneficiaries continue to transfer project experience to
Project networking 20-40 projects n/a
(projects contacted, interested parties
visited, hosted)
Website Number of visits >100 000 n/a
Web tools developed
within project
Number of visits >150 000 n/a
integrated to different
web pages
BUILDEST_KPI Page 2 of 2