Ref. Ares(2020)2417190 - 07/05/2020
EUROPEAN COMMISSION
DIRECTORATE-GENERAL FOR ENERGY
Directorate B - Internal Energy Market
B.1 - Networks & Regional Initiatives
Brussels
ENER.B.1/JB/OL/fm(2020)s2778045
Subject: Your participation in a study on “Support to the evaluation of
Regulation (EU) No 347/2013 on guidelines for trans-European energy
infrastructure.”
Dear Sir/Madam,
The Directorate-General for Energy (DG ENER) has commissioned a study to support
the revision of Regulation (EU) No 347/2013 on the guidelines for trans-European
energy infrastructure (TEN-E Regulation). The study contract to Ecorys (lead) with the
support of Ramboll, REKK, and Shepherd and Wedderburn.
The objective of this study is to assess whether the TEN-E Regulation delivered on its
objectives. The study will also be used to support DG ENER in developing policy
options and assess their likely impacts in preparing a legislative proposal for a revised
TEN-E Regulation.
To ensure a wide stakeholder consultation process, the study will use several tools to
gather input such as an open public and a targeted stakeholder consultations including
surveys, in-depth interviews, as well as webinars.
The collection of practical experience, data and information is crucial to the relevance of
the study results. The consultants are asked to interact with and involve key stakeholders
and experts across all Member States at the various stages of the study in order to obtain
evidence-based information. Your participation and cooperation throughout this process
will determine the quality of the results.
I would therefore kindly request your cooperation in sharing your practical experience
with the TEN-E Regulation by answering questions from the consultants by means of
questionnaires or interviews where necessary.
Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. +32 22991111
Office: DM24 06/145 - Tel. direct line +32 229-62369
[email protected]
For specific questions about the study, please contact Harry van Til
(
[email protected]) at Ecorys. Should you require any further clarification from
DG Energy, please do not hesitate to contact the responsible desk office Raphael Sauter
(
[email protected]).
I thank you in advance for your cooperation and support.
Yours sincerely,
Joachim BALKE
Head of Unit
[e-signed]
2
Electronically signed on 06/05/2020 18:52 (UTC+02) in accordance with article 4.2 (Validity of electronic documents) of Commission Decision 2004/563
Saatja: Lara Jansen <
[email protected]>
Saadetud: 06.08.2020 10:23
Adressaat: Jako Reinaste <
[email protected]>
Koopia: Karun Gelibolyan <
[email protected]>; Jacob Steinmann
<
[email protected]>; MKM info <
[email protected]>
Teema: TEN-E Evaluation: Question on PCI permit granting
Dear Mr Reinaste,
I am contacting you on behalf of Ramboll Management Consulting, a partner
in the consortium, which is currently performing the study commissioned
by the European Commission (DG ENER) to support the revision of the TEN-E
Regulation (Regulation 347/2013/EU). Please see the attached support
letter issued by DG ENER for further information.
While researching the implementation of the TEN-E Regulation, we were not
able to find up-to-date information on two important aspects of the
provisions. We would, therefore, kindly ask you to please fill in the
short survey below and send it back to us before August 21st.
The abovementioned gaps concern the following issues:
* the permitting scheme (as per Article 8(3): integrated, coordinated,
collaborative) currently employed by your Member State
* the existence of legislative or non-legislative streamlining measures
in line with the Guidance on streamlining environmental assessment
procedures for projects of common interests in accordance with Articles
7(4)-(7)
Question 1:IntegratedCoordinatedCollaborativeWhich permit granting
scheme(s) is/are currently applied in your Member State? Question
2:AnswerHas your Member State introduced legislative or non-legislative
streamlining measures in line with the non-binding issued by the
European Commission for streamlining environmental assessments procedures
(as per Article 7 (4)? If yes, which ones? If not, why not?
Thank you very much in advance for taking the time to respond. Please
dont hesitate to reach out in case you have any questions.
Kind regards,
Lara Jansen
Consultant
Social and Economic Impacts EU (BE)
M +32499907955
_________________________________
Click here to see how we help create sustainable change
Saatja: "Lara Jansen" <
[email protected]>
Saaja: "Jako Reinaste" <
[email protected]>
Teema: TEN-E Evaluation: Question on PCI permit granting
Kuupäev: 2020-08-06 07:23
Dear Mr Reinaste,
I am contacting you on behalf of Ramboll Management Consulting, a partner
in the consortium, which is currently performing the study commissioned by
the European Commission (DG ENER) to support the revision of the TEN-E
Regulation (Regulation 347/2013/EU). Please see the attached support
letter issued by DG ENER for further information.
While researching the implementation of the TEN-E Regulation, we were not
able to find up-to-date information on two important aspects of the
provisions. We would, therefore, kindly ask you to please fill in the
short survey below and send it back to us before August 21st.
The abovementioned gaps concern the following issues:
* the permitting scheme (as per Article 8(3): integrated, coordinated,
collaborative) currently employed by your Member State
* the existence of legislative or non-legislative streamlining measures
in line with the Guidance on streamlining environmental assessment
procedures for projects of common interests in accordance with Articles
7(4)-(7)
Question 1: Integrated Coordinated Collaborative Which
permit granting scheme(s) is/are currently applied in your Member State?
Question 2: Answer Has your Member State introduced legislative or
non-legislative streamlining measures in line with the non-binding
Guidance issued by the European Commission for streamlining environmental
assessments procedures (as per Article 7 (4)? If yes, which
ones? If not, why not?
Thank you very much in advance for taking the time to respond. Please
don’t hesitate to reach out in case you have any questions.
Kind regards,
Lara Jansen
Consultant
Social and Economic Impacts EU (BE)