dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Majandus- ja Kommunikatsiooniministeerium
Sissetulev kiriAvalik

Kiri

Majandus- ja Kommunikatsiooniministeerium · 24. august 2020
Viit
24.1-6/2020/5205-1
Registreeritud
24. august 2020
Dokumendi liik
Sissetulev kiri
Saabumis/saatmisviis
e-post
Funktsioon
24.1 EL ja rahvusvahelise koostöö korraldamine
Sari
24.1-6/S Rahvusvahelise koostöö korraldamisega seotud kirjavahetus (Arhiiviväärtuslik)
Toimik
24.1-6/2020
Vastutaja
Indrek Laineveer (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Transpordi valdkond, Teede- ja raudteeosakond, Raudteetalitus)
Lahendamise tähtaeg
23. september 2020

Failid

  • 📎Digital Rail SG.pdf517 KB
  • 📎E-kiri.pdf79 KB

Sisu (failidest)

Saatja: <[email protected]> Saadetud: 24.08.2020 04:45 Teema: Digital Rail Maintenance Conference Singapore April 2021. Manused: Digital Rail SG.pdf Digital Rail Maintenance Conference Singapore April 2021. Digital disruption has permutated ever industry around the globe and has led to concept INDUSTRY 4.0 as well as, recently, RAILWAY 4.0 and DIGITAL RAILWAY. The main technologies and solutions which have accelerated digital transformation in the railway sector in recent years are, IOT, Cloud Computing, Big Data Analytics and Automation. The challenge is much greater than just acquiring these technologies but rather effectively integrating these. The use of digital data processing is revolutionizing maintenance of infrastructure and rolling stock. Based on millions of data points captured from sensors on critical train components, analytics can detect impending part defects, ensuring maintenance is only done when required, but before a defect occurs. Reliable knowledge of which parts are likely to fail in the near future allows for close to 100% availability, as faults are fixed when units are not currently in service, avoiding breakdowns. This improves the reliability of the system as the typical operational fleet reserves of 5-15% kept as back-up in the event of faults can now be reduced, thus increasing the effective capacity. By consolidating volumes of maintenance data with business processes and IT systems and using cloud computing, manufacturers of rolling stock are now able to offer a number of new digital services, such as, Fault Detection as a Service, Predictive Maintenance as a Service (PMaaS), Simulation as a Service. Digital Rail Maintenance Conference focuses on the transformation journey of the Maintenance Department across the Rail Industry. The event is designed to provide industry professionals with proven technological concepts in order to implement an effective Digital Maintenance strategy and procedures with the ultimate end game in mind to save time, money and lives. WHY YOU CANNOT MISS THIS EVENT • Developing the right model and strategy to fully digitise the Maintenance Management function. • Adapting advances data analytics to finetune the maintenance decision-making process for all the organisation. • Integrating IOT into maintenance Strategies • Using AI and Algorithms to utilise data more effectively. • Exploiting Sensor Tech to its fullest potential to improve efficiency and reduce downtime. • A s well as looking at the future of Digital NDT, Digital Grinding, Remote Diagnostics and Digital Twin Deployment Please find attached PDF brochure for more content details and our contact information should you have any further inquiries. Only limited seats are allocated for this Summit. Group registration package available with terms and conditions applied. To register for this international conference, kindly fill in the registration form and email it back to us. Best regards DIGITAL RAIL MAINTENANCE CHANGING THE MAINTENANCE GAME 7 TH -8 TH APRIL 2021 | GOODWOOD PARK HOTEL, SINGAPORE 1. This conference is adhering to the Standard Operating Procedure for Covid 19 as instructed by the Hotel. 2. We will be practicing social distancing in the conference venue and room. 3. This is a Hybrid conference and participation can be both physical or virtual. DIGITAL RAIL MAINTENANCE Changing the Maintenance Game 7th - 8th April 2021 | Goodwood Park Hotel, Singapore “Future Savings from Implementing Digital Maintenance Strategies could be as high as 25% in some cases” EVENT OVERVIEW PWC. Digital disruption has permeated every industry around the globe and this has led to the developmental concept of INDUSTRY 4.0, as well as RAILWAY 4.0 and DIGITAL WHO SHOULD ATTEND? RAILWAY. In recent years, the main technologies and solutions which have accelerated VPs/ Directors / Heads / Managers of: digital transformation in the railway sector are IOT, Cloud Computing, Big Data Analytics and Automation. • Track • Track Maintenance The use of digital data processing is revolutionizing maintenance of infrastructure and • Track Division rolling stock. Based on millions of data points captured from sensors on critical train • Infrastructure components, analytics can detect impending part defects, ensuring that maintenance • Engineering is not only done when required, but before a defect occurs. Reliable knowledge of • Asset Management • Automation Engineer which parts are likely to fail in the near future thus allows for nearly 100% fault • Data Management prevention, as units that are not currently in service are fixed and breakdowns are • IT avoided. This improves the reliability of the system as the typical operational fleet • Diagnostics reserves of 5-15% kept as back-up in the event of faults can now be reduced, thus • Tamping increasing the effective capacity. • OHS • Head of Quality By using cloud computing and consolidating volumes of maintenance data with • Maintenance & Reliability business processes and IT systems, manufacturers of rolling stock are now able to offer • Programme Improvement a number of new digital services, such as Fault Detection as a Service, Predictive • Rolling Stock Maintenance as a Service (PMaaS), and Simulation as a Service. • Chief Digital Officers • Condition Monitoring Digital Rail Maintenance Conference by Trueventus focuses on the transformation • Fleet Managers journey of the Maintenance Department across the Rail Industry. This event is designed to provide industry professionals with the technological concepts necessary From the Following Industry sectors • Rail Owners to implementing an effective Digital Maintenance strategy that saves time, money and • Rail Operators lives. • Government Agencies • Regulatory Bodies • Maintenance Contractors • Rail Manufacturers WHY YOU CANNOT MISS THIS EVENT • Material Suppliers • Developing the right model and strategy to fully digitise the functions of Maintenance • Railway Equipment Providers Management • Adopting advanced data analytics to finetune the maintenance decision-making process across the entire organisation • Integrating IOT into maintenance strategies • Leveraging AI and machine-learning algorithms to utilise data more effectively • Making full use of Sensor Tech to improve efficiency and reduce downtime • Looking at the future of Digital NDT, Digital Grinding, Remote Diagnostics and Digital Twin Deployment For further details, contact John Karras PG. 1 T: +603 2775 0067 | E: [email protected] DIGITAL RAIL MAINTENANCE Changing the Maintenance Game 7th - 8th April 2021 | Goodwood Park Hotel, Singapore MEDIA PARTNERS Rail Analysis is the most Prominent Magazine on Railways , HSR and Metro Rail Development in India covering projects such as All Metro , HSR , Semi HSR , Ultra HSR and Traditional Rail Projects in India .We continue to be focused on the promotion of the Railways Industry Development in India and its Future Growth towards modernization of the Railways .Our Magazine is sent to Indian and Global Railway Professionals & Major marketing platform, distributed to the decision makers of the Railways Industry in India . It provides the latest news and updates on Indian projects for International companies to connect with each other and collaborate for projects in India along with information and analysis on railway projects in India. www.railanalysis.in Metro Rail News Magazine is being published by a renowned PR, Media & Advertising company Symbroj Media Pvt. Ltd. on chronicle development in urban mobility, metro railway projects and smart public transportation industries in India and worldwide, which has become a craze for more than 5 million metro commuters, rail professionals, youths, corporate houses and metro rail industries in the India and the world. www.metrorailnews.in/metro-rail-news-magazine For further details, contact John Karras PG. 2 T: +603 2775 0067 | E: [email protected] DIGITAL RAIL MAINTENANCE Changing the Maintenance Game 7th - 8th April 2021 | Goodwood Park Hotel, Singapore FEATURING PRESENTATION AND CASE STUDIES BY DISTINGUISHED SPEAKERS Sin Sin Hsu Niall Fagan Head of Track Engineering Senior Programme Manager Network Rail, United Kingdom Network Rail, United Kingdom Christophe Merlino Gonzalo Ruiz Saura Singapore Service Manager Business Development Manager in LeadMind Alstom, Singapore (CAF Digital Train) CAF, Spain Leow Meng Fai Erni Basri 2nd Deputy Group Director, Rail Asset, Deputy Director 1 for Infrastructure Railway Operations & Maintenance Ministry of Transportation Republic Indonesia, Land Transport Authority, Singapore Indonesia Henri Pottier Jeff Dusting Vice President Asia Pacific Head of ITS Engineering Strategy and Innovation RATP Dev, Singapore Transurban, Australia Gerald Schinagl Mohamad Azhar Digital Innovation Manager Superintendent OBB BCC GmbH, Austria P-Way Construction & Engineering P-Way Trackworks, Singapore Oliver Rivalta Mohammed Ariff Director of Rail APAC Supervisor Egis Rail, Singapore P-Way Construction & Engineering P-Way Trackworks, Singapore Peter Juel Jensen Wan Farest Senior Specialist, Railways and Metro Planning & Reporting Manager COWI, Denmark Universal Rail Solution, Malaysia Dr. Dieter Barnard Jakub Wachocki Global Portfolio Manager Director - Industry Advancement Siemens Mobility Services, Germany ASEAN-ANZ, Digital Advancement Academies Bentley Systems, Singapore For further details, contact John Karras PG. 3 T: +603 2775 0067 | E: [email protected] DIGITAL RAIL MAINTENANCE Changing the Maintenance Game 7thth - 8thth April 2021 | Goodwood Park Hotel, Singapore Day One: Wednesday, 7 th April 2021 0800 Registration & coffee 1445 Session Six The Digital Switch: Taking a multi-disciplinary approach to 0830 Opening keynote address move from predictive maintenance to digital predictive maintenance 0900 Session One • Advanced analytics and AI can develop strategy to deploy Turning Digital Maintenance into reality: Key components of a resources when failure occurs digital depot explained with real case study • Optimized maintenance routines to save cost • Objectives and Performance Goals of Digital Depot • Planning a predictive maintenance program • Our definition of digital depot, explained with a real lighthouse Jeff Dusting, Head of ITS Engineering Strategy and Innovation project Transurban, Australia • Value and benefits demonstrated by a case study for bogie and wheelset maintenance 1530 Afternoon refreshment Dr. Dieter Barnard, Global Portfolio Manager Siemens Mobility Services, Germany 1545 Session Seven AI For Maintenance: Evolving to deep maintenance data 0945 Session Two utilisation and the rise of the maintenance algorithm Using data and analytics in Rail asset management and • Big Data Platform is designed for the process of maintenance maintenance decision support system • Rail asset management and maintenance value drivers • Correct data and wrong data must be available in the training of • Data approaches, data structure & asset information for asset supervised learning algorithm to ascertain its reliability in management and maintenance prediction • Applications of data analytics for predictive maintenance • Scheduling optimization for maintenance in advance Leow Meng Fai, 2nd Deputy Group Director, Rail Asset, Gerald Schinagl, Digital Innovation Manager Operations & Maintenance OBB BCC GmbH, Austria Land Transport Authority, Singapore 1630 Session Eight 1030 Morning refreshment Optimize your transport network with big data • Know and understand your data and passengers 1100 Session Three • Optimise and steer your operations Digital System: Integrating digital technology and data into • Plan and predict existing workflows to reduce maintenance cost Henri Pottier Vice President Asia Pacific • Implementing digital changes to the existing operation RATP Dev, Singapore models and training employees • Shift tasks from siloed, department-specific and manually 1715 Session Nine done to streamlined Aligning sensors to digital predictive maintenance for smart • Optimising the efficiency of existing new urban transport monitoring and reduction of downtime system rather than building new infrastructure • Sensor types to activate and trigger various systems Christophe Merlino Singapore Service Manager • MEMS monitor vibrations in rail to detect for Alstom, Singapore potentially dangerous anomalies in the rails • Remote sensing by using GPS and drones 1145 Session Four Oliver Rivalta Director of Rail APAC Protecting your data in the cloud: Dealing with cyber security Egis Rail, Singapore threats • High degree of integration between IT and OT 1800 End of day one • Data Integrity and Confidentiality • Vulnerability and patch management in Maintenance services (Speaker to be advised) 1230 Networking luncheon 1400 Session Five Data Utilisation: Using live data interface to gauge accurate data streams • Video inspection, data collection and analysis • Computer modelling to improve asset reliability • Risk-based maintenance Sin Sin Hsu Head of Track Engineering Network Rail, United Kingdom For further details, contact John Karras PG. 4 T: +603 2775 0067 | E: [email protected] DIGITAL RAIL MAINTENANCE Changing the Maintenance Game 7thth - 8thth April 2021 | Goodwood Park Hotel, Singapore Day Two: Thursday 8th April 2021 0800 Registration & coffee 1445 Session Six Railway maintenance of MRT Jakarta in digital era 0830 Opening keynote address • MRT Jakarta maintenance readiness as initial construction. • Computerized maintenance management system at MRT Jakarta. 0900 Session One • Tunnel monitoring system for MRT Jakarta Leverage Asset Management: Capturing data from all systems to deliver reliability cantered maintenance (Speaker to be advised) • Predict-and-prevent approach to managing assets • Reduce redundancy and unnecessary inspection 1530 Afternoon refreshment • Predictive maintenance to reduce human labour time Gonzalo Ruiz Saura Development Manager in LeadMind (CAF 1545 Session Seven Digital Train) Digital Grinding: How to optimize your grinding activities CAF, Spain whilst saving costs • Cyclical preventive and corrective grinding 0945 Session Two Application of digital maintenance for asset management • Sensitivity to wheel and rail profiles to detect Rolling Contact • Mobile and timely access of maintenance data management Fatigue (RCF) • Centralised asset database management • Anti-noise grinding • Asset performance tracking and maintenance advisory Mohamad Azhar Superintendent (Speaker to be advised) Mohammed Ariff Supervisor P-Way Construction & Engineering 1030 Morning refreshment P-Way Trackworks, Singapore 1100 Session Three 1630 Session Eight Digital Transformation: Migrating from condition-based monitoring to digital predictive maintenance The power of linear asset management • Planning manual schedule maintenance to digital predictive • Maintenance management on several major activities like maintenance tamping, grinding and ultrasonic defects • IOT change time consuming and costly operation • Automatic transfer to asset data into the system and work • Big data analytics solving predictive problems order out of the system Wan Farest Planning & Reporting Manager • Integrated data-driven/predictive maintenance approach for the Universal Rail Solution, Malaysia maintenance 1145 Session Four Peter Juel Jensen Senior Specialist, Railways and Metro The challenges with deploying digital technologies in rail COWI, Denmark maintenance • Digital technology in the railway will shift from the traditional 1715 Session Nine emphasis on heavy engineering to software and data-handling Digital Twin for Rail: Strategy and procurement skills • Railway simulation tool for rail operation • Upgrading and Integrate different mobility options into their • Integration of GIS functionality in monitoring real time track existing system condition • Tackling structural limits such as in safety, performance and costs Erni Basri Deputy Director 1 for Infrastructure Railway • Exchange of information linking the two environments Ministry of Transportation Republic Indonesia , Indonesia Jakub Wachocki Director - Industry Advancement ASEAN-ANZ, Digital Advancement Academies 1230 Networking luncheon Bentley Systems, Singapore 1400 Session Five Designing a high speed railway for high reliability and low 1800 End of conference maintenance • The operational strategy of a proposed railway will drive the whole system specification and design • Key parameters such as maximum design speed, number of trains per hour (tonnage), and reliability targets need to be considered to meet the operational requirements • Client-led design informed by research and modelling will inform the specification to achieve high reliability and low maintenance Niall Fagan Senior Programme Manager Network Rail, United Kingdom For further details, contact John Karras PG. 5 T: +603 2775 0067 | E: [email protected] DIGITAL RAIL MAINTENANCE Changing the Maintenance Game 7thth - 8thth April 2021 | Goodwood Park Hotel, Singapore COMPANY DETAILS Name Industry REGISTER NOW John Karras Address T: +603-2775 0067 E: [email protected] Postcode Country Take a Snapshot or Scan and Email us h�ps://www.linkedin.com/in/john-karras-a454a6a Tel Fax SPONSORSHIP AND EXHIBITION OPPORTUNITIES Limited packages are available. For further details, contact: ATTENDEE DETAILS John Karras T: +603-2775 0067 E: [email protected] 1 Name Job Title Tel Email TERMS & CONDITIONS 2 Name Job Title 1. The course fee is inclusive of the event proceedings, materials, refreshment and lunch. Tel Email 2. Upon receipt of the complete registration form, invoice will be issued. Trueventus request that all payments be made 3 Name Job Title within 5 working days of the invoice being issued. Full payment must be received prior to the event. Only delegates that have made full payment will be admitted to event. Tel Email Clients are responsible for their own banking fees and banking fees will not be absorbed into the booking price. 3. Substitution & cancellations policy. Should the registered 4 Name Job Title delegate is unable to attend, a substitute delegate is welcome at no extra charge. Written notifications of all substitutions is required 5 working days prior to the event. Tel Email Trueventus contracts carry 100% full liability upon receipt of registration. Non payment does not constitute cancellation. A 100% of cancellation fee will be charged under the terms 5 Name Job Title outlined below: Due to limited event seats, Trueventus agrees to book and confirm the seat for the client upon issuance of invoice. Upon signing of this contract, client Tel Email agrees that in case of dispute or cancellation of this contract Trueventus will not be for total contract value. If a client does not attend the event without written notification at least 5 working days prior to the event date, he/she will deemed as no show. A no show at the event still constitutes that the client will have to pay the invoice amount that was issued to them. Trueventus does not provide refunds for cancellations. By signing this contract the client also agrees that if they APPROVAL cancel that Trueventus reserves the right to pursue monies owned via the use of local debt collection agency were the client is situated. Furthermore the client will be held liable for any costs incurred in collection of outstanding monies. NB: Signatory must be authorised on behalf of contracting organisation. When any cancellations are notified in writing to Trueventus 5 working days prior to the event, a credit voucher will be issued for use in future Trueventus events. Name Job Title 4. Trueventus will at all times seek to ensure that all efforts are made to adhere to meet the advertised package, however Email we reserve the right to postpone, cancel or move a venue without penalty or refunds. Trueventus is not liable for any losses or damages as a result of substitution, alteration, Tel Fax postponement or cancellation of speakers and / or topics and / or venue and / or the event dates. If force majuere were to occur Trueventus accepts no responsibility or liability Authorising Signature for any loss or damage caused by events beyond their control, including, but not restricted to strikes, war, civil unrest, flight delays, fire flood, or any adverse weather conditions. Trueventus is not liable in the event that a participant is exposed or is infected by Covid 19. Trueventus under no circumstances is liable for any other costs that might have been incurred in the attendance of the event, including but not limited to flights, accommodation, transfers, meals etc. Trueventus reserves the right to replace / change speakers in the best interest COURSE FEES ofthe conference. 5. Upon receiving this signed booking form, you the client herby consent to Trueventus to keep your details for the use of future marketing activities carried out by Trueventus and third party organisations & partners. Corporate 6. Copyright and Intellectual Property. Any redistribution or reproduction of part or all of the contents in any form in connection to this event is prohibited without prior written End of September 2020 USD 1495 consent by Trueventus. 7. Client hereby agrees that he/she exclusively authorizes End of November 2020 USD 1995 Trueventus charged the credit card with details listed above for the amount provided herein; this registration form serves 1st January 2021 onwards USD 2595 as a contract that is valid, binding and enforceable. He/she at any time will have no basis to claim that the payments Virtual Webinar USD 995 required under this Contract are unauthorized, improper, disputed or in any way. Upon issuance of invoice Trueventus will be charging the client USD 30 processing fee. Document Package USD 495 8. All Trueventus events are held in a classroom or theater Notice format. Any delegate that wishes to upgrade from virtual delegate to physical delegate must do so 4 week prior to the event. M SG-EN185 9. All Trueventus events are held at either 5 or 4 Star Hotels. PAYMENT METHODS Payment is due in 5 working days. By Signing and returning this form, you are accepting our terms and conditions. By Cheque Bank Transfer HRDF claimable under SBL scheme Credit Card HRDF Approved Training Provider Reg No: 889325K (Applicable for Malaysia only) For further details, contact John Karras TrueventusMy https://twitter.com/TrueventusMy Trueventus https://www.instagram.com/trueventus/ Trueventus https://www.linkedin.com/company/trueventus/?viewAsMember=true PG. 5 T: +603 2775 0067 | E: [email protected]
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel