dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Majandus- ja Kommunikatsiooniministeerium
Väljaminev kiriAvalik

Response to a request

Majandus- ja Kommunikatsiooniministeerium · 26. august 2020
Viit
17-9/17-0403/4974-3
Registreeritud
26. august 2020
Dokumendi liik
Väljaminev kiri
Adressaat
Ramboll Management Consulting
Saabumis/saatmisviis
e-post
Funktsioon
17 Energeetikaalase tegevuse korraldamine
Sari
17-9 Energeetika rahvusvaheliste organisatsioonidega seotud koostööalane kirjavahetus
Toimik
17-9/17-0403
Vastutaja
Regina Rass (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Energeetika valdkond, Energeetikaosakond)

Failid

  • 📎17-917-04034974-3 26.08.2020 Väljaminev kiri.bdoc219 KB
  • 📎Response to a request.pdf239 KB

Sisu (failidest)

Ms Lara Jansen Your Ref: 06.08.2020 No Ramboll Management Consulting Our Ref: 26.08.2020 No 17-9/17- 0403/4974-3 Response to a request Dear Ms Jansen, We hereby provide answers to the Questions you have submitted. If there is anything missing or needed more information and/or clarification, please do not hesitate to contact us. Question Integrated Coordinated Collaborative 1: Which permit granting Article 8(3) c scheme(s) (Government of the is/are Republic 25.11.2014. currently Order No. 511 point 3)1 applied in your Member State? Question Answer 2: Has your Yes. Member State introduce d legislative or non- legislative streamlini ng measures in line with the non- binding 1 https://delta.mkm.ee/dhs/webdav/b9ce3190af59b181fde44e364594c4ca938c0f1c/46206090223/48684569-3217- 4459-843c-be14ade13c0b/327112014001.pdf Suur-Ameerika 1 / 10122 Tallinn / ESTONIA Phone: +372 625 6342 / Fax: +372 631 3660 / E-mail: [email protected] / http://www.mkm.ee Guidance issued by the European Commissi on for streamlini ng environm ental assessme nts procedure s (as per Article 7 (4)? If yes, According to the Estonian legislation2, Appropriate Assessment is integrated in the which Environmental impact assessment (EIA), Strategic environmental assessment ones? If (SEA) procedures. The Estonian legislation includes provisions which are not, why addressed to avoid duplicative work on the assessments (e.g. the results of SEA can not? be used in the following EIA). The general approach on early integration of environmental assessments (environmental considerations) is followed (e.g. application of an exception under Water Framework Directive can be done as a part of the EIA). In addition, the Working Party on the Coordination of Authorization Procedures for Projects of Common Interest has compiled and published a guidance document for PCI project promotors in order to facilitate and streamline the process. National guidelines also include elements and measures that have been described in the Commission’s guidance (e.g. tiering, road mapping, data collection, effective public participation etc). The guidance document can be accessed at: https://www.mkm.ee/sites/default/files/pci_energeetika_projektide_loamenetluse_ labiviimise_juhend_2019.pdf . With best regards, Jaanus Uiga Director of Energy Department Regina Rass 2 https://www.riigiteataja.ee/akt/121122019007 2 (3) +372 625 6479 [email protected] 3 (3) Ms Lara Jansen Your Ref: 06.08.2020 No Ramboll Management Consulting Our Ref: 26.08.2020 No 17-9/17- 0403/4974-3 Response to a request Dear Ms Jansen, We hereby provide answers to the Questions you have submitted. If there is anything missing or needed more information and/or clarification, please do not hesitate to contact us. Question Integrated Coordinated Collaborative 1: Which permit granting Article 8(3) c scheme(s) (Government of the is/are Republic 25.11.2014. currently Order No. 511 point 3)1 applied in your Member State? Question Answer 2: Has your Yes. Member State introduce d legislative or non- legislative streamlini ng measures in line with the non- binding 1 https://delta.mkm.ee/dhs/webdav/b9ce3190af59b181fde44e364594c4ca938c0f1c/46206090223/48684569-3217- 4459-843c-be14ade13c0b/327112014001.pdf Suur-Ameerika 1 / 10122 Tallinn / ESTONIA Phone: +372 625 6342 / Fax: +372 631 3660 / E-mail: [email protected] / http://www.mkm.ee Guidance issued by the European Commissi on for streamlini ng environm ental assessme nts procedure s (as per Article 7 (4)? If yes, According to the Estonian legislation2, Appropriate Assessment is integrated in the which Environmental impact assessment (EIA), Strategic environmental assessment ones? If (SEA) procedures. The Estonian legislation includes provisions which are not, why addressed to avoid duplicative work on the assessments (e.g. the results of SEA can not? be used in the following EIA). The general approach on early integration of environmental assessments (environmental considerations) is followed (e.g. application of an exception under Water Framework Directive can be done as a part of the EIA). In addition, the Working Party on the Coordination of Authorization Procedures for Projects of Common Interest has compiled and published a guidance document for PCI project promotors in order to facilitate and streamline the process. National guidelines also include elements and measures that have been described in the Commission’s guidance (e.g. tiering, road mapping, data collection, effective public participation etc). The guidance document can be accessed at: https://www.mkm.ee/sites/default/files/pci_energeetika_projektide_loamenetluse_ labiviimise_juhend_2019.pdf . With best regards, Jaanus Uiga Director of Energy Department Regina Rass 2 https://www.riigiteataja.ee/akt/121122019007 2 (3) +372 625 6479 [email protected] 3 (3)
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel