Ms Lara Jansen Your Ref: 06.08.2020 No
Ramboll Management Consulting
Our Ref: 26.08.2020 No 17-9/17-
0403/4974-3
Response to a request
Dear Ms Jansen,
We hereby provide answers to the Questions you have submitted. If there is anything missing or
needed more information and/or clarification, please do not hesitate to contact us.
Question Integrated Coordinated Collaborative
1:
Which
permit
granting
Article 8(3) c
scheme(s) (Government of the
is/are Republic 25.11.2014.
currently Order No. 511 point 3)1
applied in
your
Member
State?
Question Answer
2:
Has your Yes.
Member
State
introduce
d
legislative
or non-
legislative
streamlini
ng
measures
in line
with the
non-
binding
1
https://delta.mkm.ee/dhs/webdav/b9ce3190af59b181fde44e364594c4ca938c0f1c/46206090223/48684569-3217-
4459-843c-be14ade13c0b/327112014001.pdf
Suur-Ameerika 1 / 10122 Tallinn / ESTONIA
Phone: +372 625 6342 / Fax: +372 631 3660 / E-mail:
[email protected] / http://www.mkm.ee
Guidance
issued by
the
European
Commissi
on for
streamlini
ng
environm
ental
assessme
nts
procedure
s (as per
Article 7
(4)?
If yes, According to the Estonian legislation2, Appropriate Assessment is integrated in the
which Environmental impact assessment (EIA), Strategic environmental assessment
ones? If (SEA) procedures. The Estonian legislation includes provisions which are
not, why addressed to avoid duplicative work on the assessments (e.g. the results of SEA can
not? be used in the following EIA). The general approach on early integration of
environmental assessments (environmental considerations) is followed (e.g.
application of an exception under Water Framework Directive can be done as a part
of the EIA).
In addition, the Working Party on the Coordination of Authorization Procedures for
Projects of Common Interest has compiled and published a guidance document for
PCI project promotors in order to facilitate and streamline the process. National
guidelines also include elements and measures that have been described in the
Commission’s guidance (e.g. tiering, road mapping, data collection, effective
public participation etc). The guidance document can be accessed at:
https://www.mkm.ee/sites/default/files/pci_energeetika_projektide_loamenetluse_
labiviimise_juhend_2019.pdf .
With best regards,
Jaanus Uiga
Director of Energy Department
Regina Rass
2
https://www.riigiteataja.ee/akt/121122019007
2 (3)
+372 625 6479
[email protected]
3 (3)
Ms Lara Jansen Your Ref: 06.08.2020 No
Ramboll Management Consulting
Our Ref: 26.08.2020 No 17-9/17-
0403/4974-3
Response to a request
Dear Ms Jansen,
We hereby provide answers to the Questions you have submitted. If there is anything missing or
needed more information and/or clarification, please do not hesitate to contact us.
Question Integrated Coordinated Collaborative
1:
Which
permit
granting
Article 8(3) c
scheme(s) (Government of the
is/are Republic 25.11.2014.
currently Order No. 511 point 3)1
applied in
your
Member
State?
Question Answer
2:
Has your Yes.
Member
State
introduce
d
legislative
or non-
legislative
streamlini
ng
measures
in line
with the
non-
binding
1
https://delta.mkm.ee/dhs/webdav/b9ce3190af59b181fde44e364594c4ca938c0f1c/46206090223/48684569-3217-
4459-843c-be14ade13c0b/327112014001.pdf
Suur-Ameerika 1 / 10122 Tallinn / ESTONIA
Phone: +372 625 6342 / Fax: +372 631 3660 / E-mail:
[email protected] / http://www.mkm.ee
Guidance
issued by
the
European
Commissi
on for
streamlini
ng
environm
ental
assessme
nts
procedure
s (as per
Article 7
(4)?
If yes, According to the Estonian legislation2, Appropriate Assessment is integrated in the
which Environmental impact assessment (EIA), Strategic environmental assessment
ones? If (SEA) procedures. The Estonian legislation includes provisions which are
not, why addressed to avoid duplicative work on the assessments (e.g. the results of SEA can
not? be used in the following EIA). The general approach on early integration of
environmental assessments (environmental considerations) is followed (e.g.
application of an exception under Water Framework Directive can be done as a part
of the EIA).
In addition, the Working Party on the Coordination of Authorization Procedures for
Projects of Common Interest has compiled and published a guidance document for
PCI project promotors in order to facilitate and streamline the process. National
guidelines also include elements and measures that have been described in the
Commission’s guidance (e.g. tiering, road mapping, data collection, effective
public participation etc). The guidance document can be accessed at:
https://www.mkm.ee/sites/default/files/pci_energeetika_projektide_loamenetluse_
labiviimise_juhend_2019.pdf .
With best regards,
Jaanus Uiga
Director of Energy Department
Regina Rass
2
https://www.riigiteataja.ee/akt/121122019007
2 (3)
+372 625 6479
[email protected]
3 (3)