dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Majandus- ja Kommunikatsiooniministeerium
Sissetulev kiriAvalik

Letter

Majandus- ja Kommunikatsiooniministeerium · 25. august 2020
Viit
17-9/17-0403/4974-2
Registreeritud
25. august 2020
Dokumendi liik
Sissetulev kiri
Adressaat
Ramboll Management Consulting
Saabumis/saatmisviis
e-post
Funktsioon
17 Energeetikaalase tegevuse korraldamine
Sari
17-9 Energeetika rahvusvaheliste organisatsioonidega seotud koostööalane kirjavahetus
Toimik
17-9/17-0403
Vastutaja
Regina Rass (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Energeetika valdkond, Energeetikaosakond)
Lahendamise tähtaeg
24. september 2020

Failid

  • 📎E-kiri.pdf78 KB
  • 📎image001.png

Sisu (failidest)

Saatja: Jacob Steinmann <[email protected]> Saadetud: 25.08.2020 11:36 Adressaat: Jako Reinaste <[email protected]> Koopia: Karun Gelibolyan <[email protected]>; MKM info <[email protected]>; Lara Jansen <[email protected]> Teema: RE: TEN-E Evaluation: Question on PCI permit granting Dear Mr Reinaste, Following up on the below email, I would kindly like to ask if you had the chance to prepare a short response. Your contribution would be highly appreciated. Thank you very much in advance for taking the time to respond. Kind regards, Jacob Steinmann Research Assistant BE REG. NO. 867596506 From: Lara Jansen <[email protected]> Sent: Thursday, 6 August 2020 09:24To: [email protected]: Karun Gelibolyan <[email protected]>; Jacob Steinmann <[email protected]>; [email protected]: TEN-E Evaluation: Question on PCI permit granting Dear Mr Reinaste, I am contacting you on behalf of Ramboll Management Consulting, a partner in the consortium, which is currently performing the study commissioned by the European Commission (DG ENER) to support the revision of the TEN-E Regulation (Regulation 347/2013/EU). Please see the attached support letter issued by DG ENER for further information. While researching the implementation of the TEN-E Regulation, we were not able to find up-to-date information on two important aspects of the provisions. We would, therefore, kindly ask you to please fill in the short survey below and send it back to us before August 21st. The abovementioned gaps concern the following issues: * the permitting scheme (as per Article 8(3): integrated, coordinated, collaborative) currently employed by your Member State * the existence of legislative or non-legislative streamlining measures in line with the Guidance on streamlining environmental assessment procedures for projects of common interests in accordance with Articles 7(4)-(7) Question 1:IntegratedCoordinatedCollaborativeWhich permit granting scheme(s) is/are currently applied in your Member State? Question 2:AnswerHas your Member State introduced legislative or non-legislative streamlining measures in line with the non-binding issued by the European Commission for streamlining environmental assessments procedures (as per Article 7 (4)? If yes, which ones? If not, why not? Thank you very much in advance for taking the time to respond. Please dont hesitate to reach out in case you have any questions. Kind regards, Lara Jansen Consultant Social and Economic Impacts EU (BE) M +32499907955 _________________________________ Click here to see how we help create sustainable change
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel