Rahandusministeerium · 21. jaanuar 2022
Viit
10-5/924-1
Registreeritud
21. jaanuar 2022
Dokumendi liik
Väljaminev kiri
Adressaat
Hiiumaa Vallavalitsus, Riigi Tugiteenuste Keskus, The Regional Council of Southwest Finland
Saabumis/saatmisviis
DVK, e-post
Funktsioon
10 VALITSUSE SISEKONTROLLISUSTEEMI KOORDINEERIMINE NING EUROOPA LIIDU TOETUSTE JA VÄLISABI AUDITEERIMINE
Sari
10-5 Riigieelarve ja välisvahendite auditi lõpparuanded koos tõendusmaterjali ja kirjavahetusega
Toimik
10-5/2021
Vastutaja
Mart Pechter (Rahandusministeerium, Kantsleri vastutusvaldkond, Finantskontrolli osakond)

Failid

  • 📎10-5924-1 21.01.2022 Väljaminev kiri.asice688 KB

Sisu (failidest)

Audit report form v.5 AUDIT OF OPERATION REPORT Central Baltic INTERREG V A Cross-border Co-operation Programme 2014 – 2020 AUDIT NUMBER: CB-26/2021 Date of final audit report 21.01.2022 Contradictory procedure 08.12.2021-21.12.2021 (first) 12.01.2022-19.01.2022 (second) Accounting period 01/07/2020 – 30/06/2021 Progress report No 5.1 in the amount of 306 501.67€ Audit scope Audited 100% Andreas Kalm, Auditor of II Audit Unit Financial Control Department of Ministry of Auditor(s) Finance of Estonia Suur-Ameerika 1, 10129 Tallinn, Estonia; Hiiu Municipality Development Department Audited organisation Mr. Sven Kriggulson & contact information Phone: +372 5624 7818 Email: [email protected] Place of the audit Hiiu Development Department Persons present during the audit Mr. Sven Kriggulson Date of on-the-spot checks 12/11/2021 Full project name Contemporary harbours with soft energy technology Project Number & Acronym CB616 – Smart Marina Priority Axis 3. Well-connected Central Baltic region SO 3.2 Improved services of existing small ports to improve local and regional Specific Objective mobility and contribute to tourism development Reporting Period 01/02/2020 – 31/07/2020 Name of the Lead Partner Åland Development Center Project duration 01/02/2018 – 30/04/2021 (start and end dates) Based on the audit work performed we have obtained reasonable assurance that the expenditure declared under the audited operation “CB616 – Smart Marina” within priority axis 3 in the reference year 01/07/2020 – 30/06/2021 is, in all material AUDIT aspects, legal and regular. CONCLUSION The auditor made two minor findings without a financial impact regarding carrying out public procurements and one minor finding regarding the on-the-spot checks of the first level control. The summarized list of findings identified during the audit is presented in the following table and report. Page 1 Audit report form v.5 Number Total Financial Total Financial of Nature of the findings Impact Impact ERDF findings The auditors identified issues with processing the extension for No financial No financial the contract by the project partner (Minor finding, without 1 impact impact financial impact) The auditors identified issues with setting and resolving the No financial No financial criteria for the public procurement by the project partner (Minor 2 impact impact finding, without financial impact) The auditors identified issues in carrying out on-the-spot checks No financial No financial by the first level controllers (Minor finding, without financial 3 impact impact impact) Page 2 Audit report form v.5 PART 1 – AUDIT SCOPE According to Article 127 of Regulation (EU) No 1303/2013 the audit authority is responsible to carry out audits of operations based on supporting documents constituting the audit trail and verify the legality and regularity of expenditure declared to the Commission, including the following aspects: a) that the operation was selected in accordance with the selection criteria for the Operational Programme, was not physically completed or fully implemented before the beneficiary submitted the application for funding under the Operational Programme, has been implemented in accordance with the approval decision and fulfilled any conditions applicable at the time of the audit concerning its functionality, use, and objectives to be attained. b) that the expenditure declared to the Commission corresponds to the accounting records and that the required supporting documentation demonstrates an adequate audit trail. c) that for expenditure declared to the Commission determined in accordance with Articles 67(1)(b) and (c) and 109 of Regulation (EU) No 1303/2013 and Article 14(1) of Regulation (EU) No 1304/2013, outputs and results underpinning payments to the beneficiary have been delivered, participant data or other records related to outputs and results are consistent with the information submitted to the Commission and that the required supporting documentation demonstrates an adequate audit trail. PART 1.1 – LIMITATION OF SCOPE The conclusions of the audit are based on the analysis of the procedure in place, information and documents gathered and interviews conducted in the audited bodies as well as the tests performed during the audit following the checklist for the audit areas. PART 1.2 – AUDIT METHODOLOGY The audit is carried out in compliance with internationally accepted auditing standards and the audit strategy, which is approved by the audit authority and group of auditors representing each Central Baltic INTERREG VA Programme Member State. The audit process comprises of three stages: a) Preparation and planning of the audit In this stage legal regulations and other documentation, including from the management verification ex Regulation (EU) No 1299/2013, Article 23(4), needed for familiarising with the selected operations were collected and analysed. Also, interviews or checklists which were needed for the planning of the audit, familiarising with the functioning of the system, project file’s structure, the objectives, and the status of implementation of the operations, the risk encountered during the implementation as well as those inherent to the type of operations. b) Fieldwork At this stage a whole range of interviews with responsible staff were conducted, documents were gathered, and testing was performed. To attain the audit objectives during the audit we tested all applicable audit areas. We performed the audit using the checklists for the several audit areas which enabled us to verify the requirements laid down in European and national legislation. The assurance about the achievement of the project’s objectives was attained via documentation uploaded to the programme’s information system (eMS), e-mail conversation with the project partner, on-the-spot checks and photos of the project outputs. Page 3 Audit report form v.5 c) Reporting This stage encompassed activities related to the preparation of the Draft Report and the contradictory procedure where auditee has been granted 10 working days to reflect on the audit report, the inclusion of their replies and comments and the submission of the Final Report. Provide the actual schedule of the contradictory procedure as following Preliminary report (version 1): 08.12.2021 Preliminary report (version 2): 12.01.2022 Final report: 21.01.2022 PART 2 – FINANCIAL DATA OF OPERATION Financial data of audited partner must be listed PART 5.1 – BUDGET (EUR) Audited Partners approved budget Granted in total for % Payments included % the partner in the payment claim ERDF € 260 526.42 85% € 260 526.42 85% Public funding (total) € 20 885.41 15% € 45 975.25 15% Private funding € 25 089.84 € 25 089.84 Income € 0.00 0% € 0.00 0% TOTAL PARTNER BUDGET € 306 501.67 100% € 306 501.67 100% Audited expenditure (according to the Sample)1 Total amount audited Ineligible Budget Line (combining milestones) 1. Staff costs € 22 700.46 € 0.00 2. Office and administration € 3 405.06 € 0.00 3. Travel and accommodation € 759.95 € 0.00 4. External expertise and services € 0.00 € 0.00 5. Equipment € 0.00 € 0.00 6. Infrastructure and works € 279 636.20 € 0.00 Total amount audited € 306 501.67 € 0.00 PART 3 – FINDINGS AND RECOMMENDATIONS PART 3.1 GENERAL During the audit we identify and document audit findings. We categorise these findings by reference to the level of importance. The categories which we use to classify our findings are as follows: Findings which have a financial impact above EUR 250 (ERDF) or any other high- Major risk deficiencies. 1 Costs outside the sample were not audited Page 4 Audit report form v.5 Findings for which action should be taken to ensure full compliance but have a Minor limited financial impact (below EUR 250 (ERDF)), no financial consequences or no high-risk character. All audit findings are reported in the final audit report, even if the Member States participating in the Programme may decide that neither the lead beneficiary nor the Programme's MA is obliged to recover an amount unduly paid which does not exceed EUR 250, per operation and accounting year, not including interest, in contribution from the Funds and the EMFF, as all the irregular amounts detected are to be taken into account for the calculation of the annual Total Error Rate of the Programme. PART 3.2 FINDINGS AND RECOMMENDATIONS PER BUDGET LINE In this paragraph the findings and recommendations per audit area are included. E. Procurement procedures AUDIT FINDING NO 1 (NON-SIGNIFICANT2) – The beneficiary has not extended the procurement contract duration correctly in a simplified procurement No. 216731. The Project partner Hiiu Municipality (the beneficiary) has carried out a simplified procurement with a reference no 216731 “Construction of Orjaku harbour service house” electronically in the e-procurement register (published on 17.12.2019). Construction contract was awarded on 18.02.2020. The beneficiary submitted a notice to the register on the modification of the public contract on 08.10.2020, extending the duration of the contract from 15.06.2020 to 30.11.2020. According to the explanation of the beneficiary, they extended the procurement contract based on a verbal agreement on modification of the contract was made beforehand, on 30.04.2020. The beneficiary sent additional correspondence to the auditors, which would indicate the discussion considering the possible extension of the contract took place in March 2020, but the auditors did not find that this correspondence reflects a specific agreement to extend the contract, nor was there any discussion of specific terms of extension. CONCLUSION AND RECOMMENDATIONS: In auditors’ opinion the beneficiary has not extended the contract duration correctly. Formalizing the extension only after the original contract would have ended may have serious risks to the contract parties themselves, regarding agreements or disagreements of specific details of the contract or its extension. This may also pose serious risks to the eligibility of the amounts financed from the programme’s funds. 1) Recommendation to the auditee: It is recommended to the beneficiary to always formalize any extensions to contracts as soon as possible and always before the end of the original contract. It is also recommended to note that any oral 2 Significant findings are those that have or may have a financial impact (i.e., ineligible expenditure). Non-significant findings are those that have no financial impact but whose correction will help the beneficiary to lower risks while implementing the project. Page 5 Audit report form v.5 agreements between parties cannot be considered as evidence and that any discussions about such agreements carried out via e-mail should be as detailed as possible to be considered evidence. Auditee response: Auditee agrees that all contract changes have to be formalized accordingly to current legalization. Auditee emphasizes that its actions were only in the best interest of procuring entity to ensure the procurement to be successful and to get the contractual works to be done accordingly to the procurement documents and legalizations. E. Procurement procedures AUDIT FINDING NO 2 (NON-SIGNIFICANT3) – The beneficiary has not correctly set or fulfilled the criterion in an open procurement No 215663. The Project partner Hiiu Municipality (the beneficiary) has carried out an open procurement with a reference no 215663 “Construction of Soela harbour service house” electronically in the e-procurement register (published on 7.11.2019). Construction contract was awarded on 18.02.2020. According to the original contract point 3.2, the deadline for final delivery of the object of the contract was 15.06.2020. The contract notice part II point 1.4 stated the following: - the transfer of the object to the contracting authority presupposes the existence of a partial usage permit for the first floor of the utility block and for the boat storage room, which is acquired by the builder. However, Annex 1 of the technical specifications of the procurement document contains a list of works excluded from the scope of the procurement. The document also stated that electrical work and related obligations were excluded from the procurement. A usage permit could not be applied for until the electrical work has been carried out properly. According to the explanations of the beneficiary, the electrical work was carried out by NGO Soela Sadama Selts (the co-financier of the beneficiary) itself and there were shortcomings in the execution of the electrical work as well as in the time schedule. The usage permit was issued only on 20.07.2021. CONCLUSION AND RECOMMENDATIONS: In auditor’s opinion the criterion contained in the contract notice has not been set or fulfilled correctly. The auditor points out that there was no valid reason for even using this criterion in the contract notice, as the electrical works were not in the scope of the contract. Additionally, once the criterion had been set, the co-financier should have taken all the precautions to fulfil this task correctly by the same time the contract was set to be ended. Setting and fulfilling this kind of criterion incorrectly may pose serious risks to the eligibility of the amounts financed from the programme’s funds. 1) Recommendation to the auditee: 3 Significant findings are those that have or may have a financial impact (i.e., ineligible expenditure). Non-significant findings are those that have no financial impact but whose correction will help the beneficiary to lower risks while implementing the project. Page 6 Audit report form v.5 It is recommended to the beneficiary to never set out criteria that are not part of the contract or fulfillable by the contractor. If that kind of criterion is set, however, it is recommended to take all precautions to fulfil it in time. Auditee response: Auditee understands the seriousness of the situation and although Auditee, acting as procuring entity, tried to be thorough and precise in procurement details such misstatement in procurement documents occurred due to re-writing and decreasing the procurement volume three times. Throughout the contracted procurement both parties acknowledged this was a misstatement from behalf of procuring entity and it was not reasonable to push contractor to fulfil criteria that was not possible to achieve within the scope of this procurement. A. Audit trail and supporting documents AUDIT FINDING NO 3 (NON-SIGNIFICANT4) – Issues in carrying out on-the-spot checks by the first level controllers. According to the Central Baltic Programme manual point 3.9, the FLCs will carry out on-the-spot checks. On-the-spot-check means that the controller visits the project and verifies that certain purchases of services and products of the approved application have taken place during the project implementation. The project “Smart Marina” involved investments in infrastructure. There were three investments within the scope of the audit. Two of them were the construction of harbour service houses, first in Hiiumaa, second in Saaremaa. And the third was the reconstruction of the concrete berth in Hiiumaa. The auditors themselves carried out on-the-spot operations on both islands on 12.11.2021. The on-the-spot checklist of the FLC was sent to the auditors by email and contained two on-the-spot checks by date. First on-the-spot check took place on 07.05.2018 and the second on 07.05.2021. One checklist has been prepared including both the two on-the-spot checks. According to the checklist, the date of final completion of the checklist was 07.05.2018, which is indicating that the dates on the checklist are mixed. According to the explanation of the FLC contact person, photos made on on-the-spot operations were included in the last period of the eMS. The photos in the eMS system mostly contained small investments made in the project and EU logos on them. There were no photos of infrastructure investments. In communicating with the first level control, the auditors learned that the person who carried out on-the-spot operations was no longer working at State Shared Service Centre5. The auditors found the following inconsistencies in relation to the on-the-spot checks made by FLC: The on-the-spot checklist was not added to the eMS system. The auditors received a checklist upon request by email. The checklist itself contained two on-the-spot checks by date, but it was not possible to determine exactly what was checked and when. According to the checklist, the first on-the-spot check took place on 07.05.2018 and the second on 07.05.2021. The date of final completion of the checklist is marked as 07.05.2018, although on-the-spot operations have been carried out according to the same checklist on 07.05.2021. Thus, there is also a contradiction in the dates. The auditors found out that no photos of infrastructure investments were included in the eMS system or with the checklist. Photos were then requested by the auditors by email. First, FLC sent the auditors photos 4 Significant findings are those that have or may have a financial impact (i.e., ineligible expenditure). Non-significant findings are those that have no financial impact but whose correction will help the beneficiary to lower risks while implementing the project. 5 State Shared Service Centre- Riigi Tugiteenuste keskus, public authority to which organization the FLC belongs Page 7 Audit report form v.5 of the infrastructure objects in Hiiumaa. Comparing the photos obtained with those taken during the auditor's own on-the-spot operations on 12.11.2021, it can be said that the photos provided by the FLC were obviously taken later and not during either of the original on-the-spot checks done by the FLC. The auditors reached the same conclusion with the photos of the harbour in Saaremaa. Also asking for photos of the on-site operations on the investments made in Saaremaa, after a while the auditors received a request from a local board member of the Soela harbour. The inquiry asked if it would be possible to forward the auditor's own photos taken on 12.11.2021, as State Shared Service Centre officials would like to see them. This also implies that the FLC had no infrastructure photos of their own on-the-spot checks, but they did not wish to state that. CONCLUSION AND RECOMMENDATIONS: In view of the above, the auditors have doubts as to whether the FLC's on-site operations were properly carried out. The on-the-spot checklist has not been properly filled out for either of the dates specified and there are no pictures of the infrastructure objects added. Recommendation to the First Level Control It is recommended to internally perform quality checks on the completed documentation of on-the-spot inspections from time to time to ensure their uniform quality. It is also recommended to confirm clearly so if some documentation is found missing. First Level Control response: It is agreed that FLC does not have to add separate on-the-spot checklists to the eMS. If necessary and asked, we send the on-the-spot checklist to the JS/MA. As explained via e-mail on November 18th, there has been one on-the-spot check in this project – that took place on May 7th, 2021. Unfortunately, an old version of checklist was used and therefore there is an old date left on the filled form. To save time and resources, the on-the-spot procedure was asked to carry out by a project-coordinator (same department, different division) who lives and works in Hiiumaa – as probably part of a communication error and lack of this kind of experience, the photos that were taken during the on-the- spot check on May 7th did not meet the program requirements. The photos were taken of the purchased items and infrastructure, but not all items were photographed under the angle, that also showed the notification of the program. After finding that out during the audit procedure, FLC asked the Project Partner to send additional photos. FLC considers that the possibility of correcting such errors is reasonable and does not change the content of the costs incurred by the partner. There was no doubt, that the works and purchases related to the project had been completed and support was used for its intended purpose. PART 4 - FOLLOW-UP This audit report is compiled for use of the Audit Authority of the Central Baltic INTERREG VA 2014-2020 Programme and will be used to draw conclusions about the functioning of the Management and Control Systems of the above-mentioned Programme. Information in the report will be disclosed to relevant parties involved of management of the EU funds, including Commission services. Parties responsible of audit finding follow-up: 1. Findings with Financial impact – The Audit Authority (AA) will inform the Managing Authority (MA) to take necessary actions to correct shortcomings in the system. a. Deductions will be made by the MA. Page 8 Audit report form v.5 b. Confirmation of deductions will be made by the AA. c. If needed follow-up audit will be done by Group of Auditor (GoA) members. 2. Findings without the Financial impact a. The MA will be informed, and evaluation will be done if further actions are needed. b. Confirmation of actions will be followed-up by the AA and if needed by the GoA members. Upon request from the MA the Auditee is responsible to implement the recommendations and deliver the proof to the MA. Audit Manager: Andreas Kalm Signed electronically Audit Supervisor: Mart Pechter Signed electronically Page 9 Hr Hergo Tasuja Hiiumaa Vallavalitsus Meie 21.01.2022 nr 10-5/924-1 [email protected] Projektiauditi lõpparuande edastamine Austatud härra vallavanem Edastame Teile Kesk-Läänemere INTERREG V-A programmi projekti nr CB616 „Smart Marina“ projektiauditi lõpparuande nr CB-26/2021. Täname Teid meeldiva koostöö ja osutatud abi eest. Lugupidamisega (allkirjastatud digitaalselt) Kaur Siruli osakonnajuhataja Lisa: Auditi lõpparuanne üheksal (9) leheküljel Sama: Pr Imbi Uusjärv, Riigi Tugiteenuste Keskus ([email protected]) Pr Merike Niitepöld, Managing Authority / The Regional Council of Southwest Finland ([email protected]) Mart Pechter 611 3152 [email protected] Suur-Ameerika 1 / 10122 Tallinn / 611 3558 / [email protected] / www.rahandusministeerium.ee registrikood 70000272