Special Programme to support institutional
strengthening at the national level for
implementation of the Basel, Rotterdam and
Stockholm Conventions, the Minamata Convention
and the Strategic Approach to International
Chemicals Management
Project Application Guidelines
Third round of applications
23 February – 21 June 2018
Unedited advance copy
Table of Content
1.Introduction .................................................................................................................................... 3
2.What is the Special Programme? .................................................................................................. 3
3.What is a Special Programme Project? ......................................................................................... 6
4.Who can apply to the trust fund? ................................................................................................... 6
5.What measures and activities can be funded? .............................................................................. 7
6.What amount of support is available? ........................................................................................... 7
7.What is the maximum duration of a project? ................................................................................. 8
8.When are the application deadlines? ............................................................................................ 8
9.How does one apply? .................................................................................................................... 8
10.How to fill the project application forms? ...................................................................................10
I. Project Application Form IA (Project Proposal Summary) ...........................................10
II. Project Application Form IB (Project Description) .......................................................15
III. Annex I of “Form IB Project Description”: Additional Project Information ..................25
IV. Project Application Form II (Budget Tables) ..............................................................26
11.What will happen next? .............................................................................................................28
Annex I: Schematic on the project development process ................................................................. i
Annex II: Terms of Reference for the Special Programme ............................................................. iii
2
Unedited advance copy
1. Introduction
This document outlines the project application process to the Special Programme. It aims
to assist developing countries taking into account special needs of least developed
countries and small island developing States, and countries with economies in transition
to develop projects to support institutional strengthening at the national level for
implementation of the Basel, Rotterdam, and Stockholm Conventions, the Minamata
Convention, and the Strategic Approach to International Chemicals Management
(SAICM).
Within the guidelines, sections 1 to 8 describe the Special Programme and how the
Special Programme project application can be developed. Sections 9 to 10 provide
guidance for Governments to develop the Special Programme project applications for the
third round of applications. Section 11 informs of the next steps once the project
application is submitted to the Special Programme Secretariat. The document also
includes a schematic on the Special Programme project application development process
and the Terms of Reference for the Special Programme.
The application guidelines supersede the previous application guidelines launched during
the 2nd round of applications by taking on board the comments provided by proponents of
previous applications and those provided by the Executive Board of the Special
Programme at their 3rd meeting held from 2 to 3 December 2017 in Nairobi, Kenya. The
present document is an unedited advance copy and will be made available for the launch
on 23 February 2018 with the deadline of 21 June 2018. An edited version of the
application guidelines, together with language versions in Arabic, French and Spanish will
be available on the Special Programme website by mid-March 2018.
2. What is the Special Programme?
The Special Programme aims to support developing countries and countries with
economies in transition in strengthening institutional capacity for the implementation of the
Basel, Rotterdam and Stockholm Conventions, the Minamata Convention and SAICM.
The first session of the United Nations Environment Assembly (UNEA-1) in June 2014
adopted in its resolution 1/5 Annex II the Terms of Reference for the Special Programmei
to support institutional strengthening at the national level for implementation of the Basel,
Rotterdam and Stockholm conventions, the Minamata Convention and the Strategic
Approach to International Chemicals Management.
As stated in Annex I of Resolution 1/5 of UNEA-1, the three components of an integrated
approach to financing sound management of chemicals and waste (adopted by UN
Environment (UNEP) Governing Council in its decision 27/12 in 2013) are, mainstreaming
in national budgets and development assistance plans, industry involvement including
designating the responsibilities of industry and the wider business community and
dedicated external finance such as support from the Global Environment Facility (GEF)
i Annex II (UNEA-1 Resolution 1/5, Annex II)
3
Unedited advance copy
and by the UNEA-1 established special programme, are mutually reinforcing and are all
crucial for the financing of the sound management of chemicals and waste at all levels.
The expected outcome of the measures supported by the Special Programme is that
strengthened national institutions in the area of chemicals and waste would have the
capacity to develop and monitor the implementation of national policies, strategies,
programmes and legislation for the sound management of chemicals and wastes, to
promote the adoption, monitoring and enforcement of legislation and regulatory
frameworks and to promote the mainstreaming of the sound management of chemicals
and wastes into national development plans, national budgets, policies, legislation and
implementation frameworks at all levels.
Global scene setting
Strengthened sound management of chemicals and wastes in the long term is essential
for sustainable development. The 2030 Agenda for Sustainable Development and its 17
Sustainable Development Goals (SDGs) were adopted by the General Assembly of the
United Nations in September 2015. The integration of sound management of chemicals
and wasteii in the 2030 Agenda for Sustainable Development is a major achievement. By
fundamentally linking chemicals and waste management with the economic,
environmental and social development agenda, it created a new impetus for the
implementation of international chemicals and waste agreements, i.e. multilateral
environmental agreements (MEAs) on chemicals and waste, notably the Basel, Rotterdam
and Stockholm Conventions, the Montreal Protocol and the Minamata Convention, as well
as other relevant international commitments and policy frameworks, including the
Strategic Approach to International Chemicals Management (SAICM).
ii Here understood as hazardous waste. Nuclear waste, biological waste, sanitation waste etc. are not
included
4
Unedited advance copy
Objective and Strategic Priorities of the Special Programme
The objective of the Special Programme is to support country-driven institutional
strengthening at the national level, in the context of an integrated approach to address
the financing of the sound management of chemicals and wastes, taking into account
the national development strategies, plans and priorities for each country, to increase
sustainable public institutional capacity for the sound management of chemicals and
wastes throughout their life cycle. Institutional strengthening under the Special
Programme will facilitate and enable the implementation of the Basel, Rotterdam and
Stockholm conventions, the Minamata Convention and the Strategic Approach to
International Chemicals Management (hereinafter referred to as “the Instruments”).
For the purposes of the Special Programme, institutional strengthening is defined as
enhancing the sustainable institutional capacity of Governments to develop, adopt,
monitor and enforce policy, legislation and regulation, as well as to gain access to
financial and other resources for effective frameworks for the implementation of the
Instruments for the sound management of chemicals and wastes throughout their life
cycle.
Expected outcome of the Special Programme is to strengthen national institutions’
capacities to do the following:
(a) Develop and monitor the implementation of national policies, strategies,
programmes and legislation for the sound management of chemicals and waste;
(b) Promote the adoption, monitoring and enforcement of legislation and regulatory
frameworks for the sound management of chemicals and waste;
(c) Promote the mainstreaming of the sound management of chemicals and waste
into national development plans, national budgets, policies, legislation and implementation
frameworks at all levels, including addressing gaps and avoiding duplication;
(d) Work in a multisectoral, effective, efficient, transparent, accountable and
sustainable manner in the long term;
(e) Facilitate multisectoral and multi-stakeholder cooperation and coordination at the
national level;
(f) Promote private sector responsibility, accountability and involvement;
(g) Promote the effective implementation of the Basel, Rotterdam and Stockholm
conventions, the Minamata Convention and the Strategic Approach;
(h) Promote cooperative and coordinated implementation of the Instruments at the
national level.
5
Unedited advance copy
The Special Programme will be administered by UN Environment who will provide the
Special Programme trust fund and a secretariat to deliver administrative support to the
Programme.
3. What is a Special Programme Project?
…is Special Programme …is NOT Special Programme
o Builds long-term capacity in the o Project-focused with a clear start and
relevant ministry(ies) end date
o Has a sustainable financing o Does not fund outcomes beyond the
mechanism and/or a plan for ensuring duration of the project
long-term sustainability o Primarily driven or implemented by an
o Country-driven project that is outside organization
conceived and implemented by o Engages only one relevant sector
applicant o Focuses only on dealing with the
o Focuses on multi-sectoral involvement aftermath of mismanagement
o Improves chemicals management to o Builds private sector capacity
mitigate negative impacts o Focuses on only one of the
o Engages with private sector conventions or does not work towards
stakeholders ratifying/implementing the provisions of
o Promotes an enabling environment to the conventions
foster the ratification of the Basel, o Does not coordinate among relevant
Rotterdam, Stockholm conventions ministries
and the Minamata Convention o Multiple applications from the same
o Coordinates the implementation of country in the same application cycle
policies, strategies and national can be indicative of a lack of
programmes for the sound coordination
management of chemicals and waste o Does not promote gender
o Has a strong gender mainstreaming considerations
component(s)
o Emphasizes gender-disaggregated
data collection where relevant
4. Who can apply to the trust fund?
Governments
Developing countries, taking into account the special needs of least developed countries
and small island developing States, and countries with economies in transition are eligible
for support.
The Governments here refer to the national government department in charge of
chemicals and waste agenda at the national level. The affiliations of governments and
local governments are not eligible.
6
Unedited advance copy
As requested in Form IA, the Official focal point, is required to endorse the application on
behalf of the Government (see page 6 of Form IA) before the Government applies.
Endorsement letter from the Official focal point should be sent to the secretariat at the time
of submission of the application.
5. What measures and activities can be funded?
Measures and activities falling within the objective of the Special Programme (paragraph
1 of the Terms of Reference). Section IViii of the Terms of Reference of the Special
Programme provides the scope of the Special Programme. The terms of reference
stipulate that the Special Programme should avoid duplication and proliferation of funding
mechanisms and associated administration, and should fund activities that fall outside the
mandate of the GEF.
6. What amount of support is available?
The Special Programme Trust Fund may provide support from US$ 50,000 to US$
250,000 per project proposal, including possible administration fees and monitoring and
evaluation and financial audit.
In exceptional circumstances, an applicant country may request up to a maximum of
US$ 500,000. Project requesting more than US$ 250,000 should adhere to the following
criteria, among others:
(1) All relevant sectors are involved in project implementation e.g. environment, health,
agriculture, customs, labour, etc. The roles and responsibilities of the relevant sectors in
project implementation should be clearly defined and letters of support from the relevant
Ministries should be included as part of the application package;
(2) Institutional actors including, but not limited to, private sector and civil societies are
involved. Roles and responsibilities of the relevant stakeholders in project implementation
should be clearly defined. Letters of support from these stakeholders should be included
as part of the application package;
(3) Builds on circular and/or green economy initiatives. The project should demonstrate
how the project’s outcomes and outputs encourage sustainable consumption and efficient
use of resources, as well as, how the project aims to achieve sustainable development;
(4) Links with investment and development banks for investment opportunity are
highlighted at the global, regional and national levels as appropriate. Provide information
how these investment opportunities can foster long-term sustainability of the Special
Programme project.
iii Annex I, page ii
7
Unedited advance copy
(5) Demonstrate mainstreaming and overall integration at the national level, and how
these efforts can be scaled up at the regional level in a synergistic manner
The project should list activities that can be up scaled from national to regional level, and
areas of cooperation at the regional level that are or can be synergistic.
(6) Builds on existing projects from other programmes and obligations under relevant
MEAs. The project should demonstrate how it builds upon the outcomes of previous or
ongoing projects, and how these outcomes will enhance the objectives of the Special
Programme project.
7. What is the maximum duration of a project?
Projects should be fully completed within three years.
8. When are the application deadlines?
The 3nd round of applications has a mandatory deadline of 21 June 2018.
Applicants are encouraged to submit their application packages in English only as early
as possible in advance of the deadline in order for the secretariat to review them for
completeness and eligibility, and provide guidance.
To meet the deadline, advance copies of applications signed by the applicant and the
Official focal point can be sent to the secretariat by e-mail, and original should be
submitted to the secretariat by post.
9. How does one apply?
Step 1: Prepare the application package
The application package consists of the following documents:
1. Project Application Form IA – Project Proposal Summary)
2. Project Application Form IB – Project Description
3. Annex I of “Form IB – Project Description”: Additional Project Information
4. Project Application Form II – Project Budget
Additional documents:
Endorsement letter from the Official focal point
Proof of funding from beneficiary country and other sponsors and donors
Letters of project endorsement from implementing partners
Other supporting documents
8
Unedited advance copy
Complete and sign the application form
The application form is available on the Special Programme website:
https://www.unenvironment.org/explore-topics/chemicals-waste/what-we-do/special-
programme.
The application forms must be completed in English only, and submitted electronically with
a scanned signature. The original signed application forms should also be submitted to
the Special Programme secretariat as part of the application package.
Step 2: Mail the completed application package
Once the application package is completed (you can confirm with the secretariat that the
package is considered completed), mail the signed application to:
Special Programme Secretariat
c/o Chemicals and Waste Branch,
Economy Division, UN Environnent
11-13 chemin des Anémones
International Environnement House
CH-1219 Châtelaine, Geneva, Switzerland
Fax: (41 22) 917 83 43
E- mail:
[email protected]
All supporting documentation must be forwarded with your original submission.
Applicants are encouraged to submit their application packages as early as
possible in advance of the deadline in order for the secretariat to review them for
completeness and provide guidance. Advance copies of applications signed by
the applicant and the Official focal point can be sent to the secretariat by e-mail,
and original should be submitted to the secretariat by post.
Additional resources
Applicants may wish to use and/or make reference to the following resources in the
development of the application.
1. The Basel, Rotterdam, and Stockholm Conventions:
http://www.brsmeas.org/
Information on countries ratification status, Convention text which includes the
obligations
2. The Minamata Convention on Mercury:
http://www.mercuryconvention.org/
Information on countries ratification status, Convention text which includes the
obligations
9
Unedited advance copy
3. UNEP’s LIRA Guidance:
http://web.unep.org/chemicalsandwaste/what-we-do/policy-and-
governance/reports-and-publications/lira-guidance
This guidance aims to provide practical support to policy makers for strengthening
national legislation and institutional set-ups for achieving sound management of
chemicals. It includes proposals for measures for financing necessary administration
activities in this regard.
4. IOMC Toolbox:
https://iomctoolbox.oecd.org/Default.aspx?idExec=330aab2f-6197-4cc7-8c25-
a409bb9e45ae
The IOMC Toolbox is a problem solving tool that enables countries to identify the most
appropriate and efficient national actions to address specific national problems related
to chemicals management.
5. The Strategic Approach to International Chemicals Management:
http://www.saicm.org/
SAICM overall objective is the achievement of the sound management of
chemicals throughout their life cycle so that by the year 2020, chemicals are
produced and used in ways that minimize significant adverse impacts on the
environment and human health.
6. The Global Environmental Fund:
https://www.thegef.org/topics/chemicals-and-waste
The following notes provide guidance on filling out the forms. This guidance and project
application forms are also available in Arabic, French and Spanish. An eLearning tool
will also be available in the near future to assist applicants with the development of the
application. Please refer to the Special Programme website for updates on these
additional resources.
10. How to fill the project application forms?
I. Project Application Form IA (Project Proposal Summary)
The project summary should include:
1.1 The title of the project
1.2 Duration: Indicate the proposed project duration expressed in number on months
(noting that the maximum duration for a project is 36 months)
1.3 Country Status: Please indicate the status of your country containing the information
as follows:
Developing countries (indicating whether the applicant is a least developed country
or a small island developing State), and countries with economies in transition;
Party to one of the relevant conventions.
10
Unedited advance copy
Demonstrated that it is in the process of preparing for ratification of any one of the
conventions.
1.4 Project Executive Summary: Present a brief outline of project, its objectives and
outcomeiv (approximately 250 words).
1.5 Proposed Measures: List concretely and clearly the measures/outputs v which are
proposed for financial support in line with the objective of the Special Programme (paragraph
1 of the terms of reference). The proposed measures should be consistent in sections 1.5,
5.1 and in 5.4.2.
The proposed measures should clearly demonstrate how they support the ratification of
relevant MEAs and their amendments and/or meet the country’s obligations under the
relevant MEAs. In addition, the project should build upon lessons learned and results from
previous projects of similar scope e.g. National Implementation Plans of the Stockholm
Convention, Quick Start Programme of SAICM and related GEF projects.
In line with the objectives of the Special Programme, the
proposed measures include:
1) Establishment of a project management unit to support
implementation of the project
2) Undertake a comprehensive gap analysis on existing
PROPOSED institutional capacity
1.5 MEASURES 3) Improve the country’s reporting under the chemicals and
waste MEAs
4) Conduct capacity building activities including training of
trainers or development of training modules
5) Monitoring, evaluation and financial audit (this proposed
measure is mandatory)
Box 1: Examples of proposed measures in line with the Special Programme objectives
1.6 Explain how each proposed measure will address institutional strengthening at the
national level: demonstrate concretely how each of the proposed measures listed in section
1.5 above will strengthen the country’s institutional capacity to meet its obligations under the
Basel, Rotterdam and Stockholm conventions, the Minamata Convention and SAICM.
1.7 Associated domestic measures: List concretely the associated domestic measures
that are in place or to be taken to ensure the sustainability of national institutional capacity
strengthening by the project. For example:
iv Outcome: The uptake, adoption or use of project outputs by the project beneficiaries. Observed
as change of Behaviour, Attitude/Action, Condition, Knowledge or Skill
v Outputs: are the products, capital goods and services delivered by the project. Outputs relate to
the completion of activities and managers have a high degree of control over them
11
Unedited advance copy
Administrative and institutional structures put in place for the sound management of
chemicals and waste;
Nomination of permanent staff in relevant ministries and authorities responsible for the
sound management of chemicals and waste;
Related budgetary allocations for structures, personnel, etc.;
Regulatory frameworks in place that will be implemented by the responsible structures
and institutions.
The following associated domestic measures will be implemented
in parallel to the project implementation to ensure the sustainability
of the project outcomes and outputs.
1. The process for formalizing the project management unit as a
ASSOCIATED permanent unit within the Government will be initiated including,
integrating the budget for the project management unit into the
1.7 DOMESTIC overall Ministry budgeting processes.
MEASURES 2. Commitment to regularly report under the chemicals and waste
MEAs is provided.
3. The implementing agency will continue to engage with private
sector and civil society actors.
4. National budgetary provision to sustain project outcomes, will
be put in place including other cost recovery measures.
Box 2: Examples of associated domestic measures in line with the proposed measures listed in section
1.5 and the Special Programme objectives
1.8 Explain how the associated domestic measures will address the sustainability of
institutional strengthening at the national level supported by the project: demonstrate
concretely how each of the associated domestic measures listed in section 1.7 above will
strengthen the country’s institutional capacity to meet its obligations under the Basel,
Rotterdam and Stockholm conventions, the Minamata Convention and SAICM.
1.9 Summary of Overall Country Approach to Institutional Strengthening: describe
how your country is strengthening or intends to strengthen its institutional capacity for the
sound management of chemicals and waste in all relevant sectors (e.g. environment; health;
agriculture; customs; labour, etc.), including decisions and measures taken or foreseen. A
clear description of how the project will fit into the overall country approach to institutional
strengthening should be elaborated for projects requesting an exceptional allocation, which
exceeds the maximum limit of US$ 250,000.
The long-term sustainability of the project should be highlighted, using concrete examples on
what actions will be undertaken at the national level to ensure long-term sustainability of the
project and its outcomes.
1.10 Budget and Funding summary: List the project budget for each proposed measure as
presented in section 1.5. The budget and funding summary presents the requested amount
from the Special Programme Trust Fund and the beneficiary contribution (cash and/or in-kind
contribution).
12
Unedited advance copy
Indicated the amount requested from the Special Programme Trust Fund as well as the value
of contribution from the application country. Also indicate the confirmed and/or requested
contributions from other sources and the total budget of the project. Please provide a signed
letter confirming the beneficiary contribution together with the rest of the application.
1.10 BUDGET AND Beneficiary
FUNDING contribution
Request from SPTF
SUMMARY (cash and/or in kind)
List the budget
Proposed measure 1 $ 50,000
for each
proposed
Proposed measure 2 $ 50,000 $ 25,000
measure by
funding source
Proposed measure 3 $ 90,000 $ 25,000
Proposed measure 4 $ 45,000
Proposed measure 5 $ 15,000
Sub total $ 250,000 $ 75,000
Grand total $ 325,000
1.11 Additional information regarding all funding sources: Indicate all other related
contributions from the Government as well as funding received and/or requested at the
national and international levels, including from intergovernmental organizations, foundations
and the private sector. List specifically in Form IB - Annex I all related projects that may have
been funded by or applied to for funding from the GEF, and other sources.
Furthermore, please indicate if the project has already been submitted in a previous round of
applications to the Special Programme Trust Fund and if it received funding. Stipulate
whether the funds from other sources have been confirmed and, if not whether the
project’s viability is dependent on confirmation of the other funding. If contributions of
cash or in kind support have been confirmed, please note the amounts or value of in-kind
support. Evidence of government contributions or other funding needs to be included in
the application package, for example in the form of written pledges or deposits
received.
2. Contact Details
2.1 Applicant: Provide details of the responsible officer and organization/institution submitting
the support request.
13
Unedited advance copy
2.2 Project Implementing Organization/Institution: If relevant, provide details of the
responsible officer and organization/institution for the implementation of the projectvi. Correct
contact details are essential for efficient follow-up. If it is the same as the applicant, please
state clearly in this section that they are the same.
Please note that if the project implementing organization/institution is not a Government or
UN Agency then a due diligence will be carried out in accordance with UN Environment’s
Partnership Policy, prior to the time of developing the legal agreement with the entity.
Adequate time needs to be factored into the project development period for this process.
2.3 Project Partners: Provide details of the intergovernmental organization(s), or
governmental entity(ies), or non-governmental organization(s), regional centres established
under the Instruments, private sector organization(s), academic or research organization(s)
acting in partnership with the implementing organization/institution to prepare the project
proposal and/or implement the project. Please provide letters of support from all project
partners and submit them together with the rest of the application package. For projects
requesting for more than US$ 250,000, letters of support from Ministries and stakeholders
involved in the project implementation is a mandatory requirement.
2.4 Independent monitoring and evaluation of the project: Provide contact details for the
person who will undertake the independent monitoring and evaluation of the project. The
independent monitoring and evaluation should be undertaken by a person or an organisation,
which has no ties to the project development and implementationvii (see also the separate
guidelines for independent monitoring and evaluation and section “Evaluation Plan” of section
“III – Project Description”). Monitoring and evaluation should be listed as a separate output in
the work plan and budget. The budget for monitoring, evaluation and audit should not be
higher than a maximum total of US$ 15,000.
2.5 Financial Audit: In the case of projects without an intergovernmental organization acting
as executing agency, applicants are required to identify an external auditing firm or entity. The
auditor would be required to make an audit report of project expenditures after completion of
the project. As noted above, the budget for monitoring, evaluation and audit should not be
higher than a maximum total of US$ 15,000.
3. Application package checklist
Please review the list and check all relevant boxes before sending the application. Applicants
are invited to note that budget, annexes, beneficiary contribution letter, and letters of support
including the endorsement letter from the official focal point are mandatory requirements of
the application and without which applications will be considered incomplete.
vi It is understood that the applicant’s organisation, agency or ministry should be the implementing
agency of the project since it will have the overall responsibility and will be the main coordinator of the
project. Applicants may however choose to transfer this responsibility to another organisation, agency
or ministry. In compliance with United Nations financial rules, profit-making companies cannot serve as
implementing (or executing) agencies.
vii Applicants may wish to identify, for example, an academic institution, a research centre, an
independent consultant, or a non-governmental organization
14
Unedited advance copy
4. Endorsement and Certification
4.1 “Official focal point” sub-section: All applications must be endorsed by an Official focal
point for the Special Programme. The Official focal point for the Special Programme should
coordinate at the national level and in the case of several submissions make sure that the
different applications in no way duplicate work. It is preferred that the Official focal point for
the Special Programme submits only one application from the countryviii. Endorsement letter
from the Official focal point should be submitted to the secretariat upon submission of the
application.
4.2 “Applicant Certification” sub-section: Please sign, and date the application form before
sending it via post to the Special Programme secretariat. Signed advance copies of the
application should be submitted by email to meet the application deadline. However, the
application will not be considered finalised until receipt of the signed original copy.
II. Project Application Form IB (Project Description)
This section is an essential part of the application package. It needs to be developed by the
applicant and must include the following elements:
5. Project Description
5.1 Detailed Description of Each Proposed Measure (see Form IA Section 1.5): Explain
concretely, in detail and in a clearly structured manner each one of the proposed measures
to be supported and how the measures and activities proposed will lead to long term
institutional capacity and sustainability. The proposed measures should clearly demonstrate
how they support the ratification of relevant MEAs and their amendments and/or meet the
country’s obligations under the relevant MEAs.
The proposed measures are expected to lead to strengthened national institutions in line with
the expected outcomes on institutional strengthening on the Special Programme as set out in
paragraph 3 of the terms of reference of the Special Programme. The proposed measures
may encompass the activities listed in paragraph 5 of the Terms of Reference (Annex I) ix. In
addition, all stakeholders, including organizations, Ministries or Departments involved under
each proposed measures must be clearly identified. Define the role and responsibilities of
national and international implementing partners. Where appropriate, the multi-stakeholder
and multi-sectoral aspects of the project implementation should be clearly identified. The
relevant knowledge, experiences or competency possessed by different actors in order to
deliver the project successfully should be stressed.
In explaining the proposed measures, please make sure that it is clear how these measures
will be sustainable in order to ensure long term institutional capacity at the national level. For
viii The Official focal point should coordinate different applicants and try to make different units work together and
submit a common proposal rather than submitting separate proposals.
ix Indicate other chemicals and waste management projects undertaken in the past, currently being implemented
or planned in the future. If any, please provide details on the timeframe, funding and framework of such projects,
as well as details on the links with the proposed Special Programme project.
15
Unedited advance copy
this, it is important to take into account and link with the information provided in separate
sections on overall country approach to institutional strengthening (Section 1.9) and
associated domestic measures (Section 5.2).
This section should include only directly relevant material.
The project outcome is the country’s institutional capacity for sound
management of chemicals and waste throughout their lifecycle is enhanced
and reporting obligations under relevant MEAs is improved.
The following measures/ outputs will be achieved during the project:
1) Establishment of project management unit and organization of
process
The project management unit (PMU) will be established and operational
formed and operational by the end of the first trimester of project
implementation. The PMU will be a multi-stakeholder body comprising of
representatives of key participating ministries and public and private
organizations. The PMU will play an active role in project, and will be
responsible for providing leadership as well as overall strategic guidance on
the execution of the project at the national level. The PMU meet bi-annually
to facilitate stakeholder involvement, to assess the progress of the project
towards the project goals and objectives, to determine the necessary
corrective actions to be taken in case of diversion and to mainstream the
DETAILED findings and outcomes of the project within the respective sectors and groups
DESCRIPTI they represent.
ON OF
EACH - Organize the Inception Workshop
PROPOSED - Establish Project Management Unit and agree on its mandate
5.1
MEASURE
(REF: 2) Undertake a comprehensive gap analysis on coordination for sound
management of chemicals;
SECTION
The establishment of the National Coordination Mechanism (NCM) for
1.5 ABOVE) chemicals management will ensure sustainability of existing coordination
mechanisms in chemicals management by building capacities of the
stakeholders who have previously participated in the management of
chemicals and by involving new stakeholders that will bring new skills and
expertise. In doing so, this project measure aims at strengthening capacity
while capitalizing on existing knowledge and expertise. It is envisaged under
this measure, that a comprehensive gap analysis of the existing institutional
capacities to identify the weaknesses and key areas of intervention will be
undertaken.
- The NCM comprising of representatives from key ministries is
formed.
- Draft mandate of NCM is circulated and agreed amongst the line
ministries
- The list of members and the mandate of the NCM is approved
through a MoEnv order
16
Unedited advance copy
3) Improve the country’s reporting under the chemicals and waste
MEAs
This measure is aimed at improving the country’s reporting under the relevant
MEAs will contribute to systematic changes in waste management through
the introduction of inventory and processing of data on hazardous and other
wastes, awareness raising and capacity building in the waste management.
- Methodology for inventory of waste using the best international
practice is developed
- Hazardous Waste inventory for reference is developed
4) Conduct capacity building activities including training-of-trainers
The capacity building activities will include a training of trainers’ component,
with the aim of replicating and building upon the training during and beyond
the duration of the project.
- Establishment of a training of trainers’ programme
- First training of trainers’ workshop held
5) Monitoring, evaluation and financial audit
This measure will identify the steps for monitoring and evaluation. The
evaluation plan will be based on the project workplan and proposed
measures (1 – 4 above). Project activities and progress will be monitored
and the outcomes will be reported on.
- A monitoring and evaluation plan is developed
- Progress and outcome reports are prepared and submitted to the
secretariat.
Box 3: Example of project description in line with the proposed measures listed in section 1.5 and the
Special Programme’s objectives
5.2 Detailed Description of the Associated Domestic Measures (see Form IA Section
1.7):
Provide detailed description of the associated domestic measures as listed in Form IA Section
1.7, and explain how the associated domestic measures will address the sustainability of
institutional strengthening at the national level supported by the project.
1. The implementing agency will start the process of applying to
include the project management unit as a permanent unit within
the government.
Following the initial project-based establishment of the project
DETAILED management unit (Chemicals Unit) in the implementing agency, efforts will
DESCRIPTION be made to establish the unit as a formal component of the implementing
5.2 OF agency’s internal structures to ensure that the Government can address
ASSOCIATED the sound management of chemicals in the long-term. The Chemicals Unit
DOMESTIC will provide dedicated services for strengthening chemical management in
MEASURES the country.
2. The implementing agency will submit proposed secondary
legislation to the government.
17
Unedited advance copy
Through this project, the newly established Chemicals Unit will work to
ensure that draft secondary legislation is both technically viable and
feasible, and compliant with the legal and constitutional requirements of
the country. Once the secondary legislation is submitted to the relevant
Ministry, it will then go through various stages before finalization.
Implementation and application of this secondary legislation on chemical
management will ensure the coordination between a number of line
Ministries following the completion of the project.
3. The implementing agency will continue to engage with private
sector and civil society actors.
The Chemicals Unit will take responsibility for establishing and
maintaining the connection between implementing agency with the private
sector and civil society actors.
4. A stable resource base to sustain project outcomes will be put in
place including other cost recovery measures.
Market-based incentives will be part of the consideration of the chemicals
and wastes cost recovery measures that will be investigated, and if
appropriate will be legislated. Funds generated from newly instituted cost
recovery measures will contribute to the maintenance of the coordinating
mechanism operations. This will significantly contribute to sustainability of
the Special Programme project.
Box 4: Example of detailed description of associated domestic measures in line with the associated
domestic measures listed in section 1.7 and the Special Programme’s objectives
5.3 Detailed Information on Project Management and Implementation: Indicate the
organization/institution responsible for project management and how the project is managed.
Present the project implementation structure through an organizational diagram. Describe the
composition, roles and responsibilities and how decisions will be made, as appropriate for the
following actors:
Project manager and the Government authority implementing the project;
Lines of responsibility of project team members;
External partner agencies, highlighting each agencies responsibility in the project;
The Project Steering or Coordination Committee, including specificities on the roles and
responsibilities of the partners in the decision making process;
Indicate how the project will ensure both accountability of, and coordination between
different relevant national authorities and partners.
18
Unedited advance copy
DETAILED
INFORMATION
ON PROJECT
5.3 MANAGEMENT
AND
IMPLEMENTATI Role of the Project Management Unit
ON The day-to-day management and administration of the project will be handled by
the Project Management Unit (PMU) headed by the Project Coordinator from the
Ministry of Environment. The PMU will provide secretariat services that includes,
inter alia:
Scheduling and coordinating meetings;
Setting the meeting agendas;
Producing documentation and distributing to members;
Recording and distributing to members meeting minutes;
Managing correspondence;
Hiring and managing personnel
Similar descriptions on the role of all the project actors listed in the graphic
above should be provided.
Box 5: Example of the detailed information on project management and implementation structure
5.4 Project Description (Log Frame):
5.4.1 Develop an overall project outcome. The project outcome can inform the title of the
project.
Examples of project outcomes include:
- “Country X’s capacity for implementing their obligations under the relevant MEAs has improved”.
- “Country X’s institutional capacity for the sound management of chemicals is enhanced and
reporting obligation under relevant MEAs is improved”.
- “Structures, institutions and legislation in place to enable Country X to improve its reporting
obligations under the four chemicals and waste MEAs and the implementation of SAICM”.
19
Unedited advance copy
Specify the means of verification of the indicators and the targets. How will the project verify
that the outcome is met? Is it by reports, other documentation, records, contracts, evaluations,
etc.
List the project milestones for the overall project outcome and indicate the reporting period for
each milestone. Examples of project milestones x include, Steering Committee has been
established or that a report has been published, or that a number (xx) of representatives have
participated in a certain activity or been trained. The reporting period should be indicated on
a bi-annual basis, e.g. Month 6/Year 1, Month 12/Year 2, and so on.
5.4.1 Overall Indicators Means of verification
project
outcome
The country’s Establishment of a Chemicals Letter from the Minister of
institutional Unit Environment, announcing the
capacity for the [Baseline: 0; Target: 1] establishment of the Chemicals
sound Unit
management of
chemicals is Reports submitted to the BRS Reports and submissions to
enhanced. The and Minamata Secretariats conventions secretariats
country ability [Baseline: 1; Target: 3]
to report on
obligations
under relevant
MEAs is
improved.
Performance targets (project milestones that show Expected Milestone for
progress towards completing the project outputs and each reporting period
achieving the overall project outcome) (biannual)
Month / Year (e.g)
Milestone 1: Terms of reference for the Project
Management Unit are developed and the PMU formally Month 6/Year 1
established
Milestone 2: Project management unit staffed and Month 12/Year 1
undertaking baseline chemical research
Milestone 3: Project management unit meets reporting Month 12/Year 2
requirements
Box 6: Example of the description of the project logical framework at the outcome level
x Performance Targets / Milestones: Are benchmarks (not activities) that represent attainment of a
project stage or project achievement that show progress towards project outcomes and outputs.
Milestone attainment should be strictly answerable with a “yes” or “No” answer.
Outcome milestone will often show progress on a particular outcome indicator target, but can also be
a major significance benchmark , believed to lead to the outcome
20
Unedited advance copy
5.4.2 Develop the project outputs in line with sections 1.5 and 5.1. List the indicators for each
project activity and related outputs. Indicate the number of areas / partners / specified
activities / persons / progress / percentage / reports /etc. and set a baseline. For example, if
1 legislation has already been adopted by the country, then 1 will be set as a baseline for that
indicator. If the proposed measure is to adopt an additional legislation, then the target would
be 2.
5.4.2 1. Project Indicators Means of verification
Activity
/Output
Establishment Inception workshop: [Baseline: 0; Meeting reports
and Target: 1]
operationalizat
ion of the Project management unit Staff contracts
project [Baseline: 0; Target 1]
management
unit Number of Project Management
Unit meetings [Baseline: 0; Target
6]
Project activity/output Milestones: Expected Milestone for each
reporting period
Month / Year (e.g)
M 1.1 Project Management Unit established Month 6/Year 1
M 1.2 Inception workshop held Month 8/Year 1
Box 7: Example of the description of the project logical framework at the output level
The process described above should be followed for all proposed measures / outputs.
5.5 Project Assumptions: List the factors or conditions, and challenges that are likely to
affect the successful achievement of project objectives (e.g. institutional, financial,
administrative, technical, political) and the mitigation measure that could be taken to reduce
risks. Indicate how the project managers would ensure successful implementation
(strategies).
21
Unedited advance copy
5.5 PROJECT Risk: Delay of project activities due to inefficient HR procedures (e.g. hiring
ASSUMPTIONS national consultants), inefficient personnel, or coordination challenges.
Mitigation measure: TORs and HR procedures will be developed well in
advance of related activities and the hiring process will be closely monitored
by the Project Management Unit to ensure that there are no delays and that
appropriate candidates are selected. The hiring Committee will also meet
regularly to review progress, ensure coordination, and agree on mitigation
measures if needed
Risk: Development and endorsement of policies delayed
Mitigation measure: The existing Parliamentary committee on environment
will take up the responsibility of ensuring political support is obtained where
necessary
Box 8: Examples of project assumptions and mitigation measures
5.6 Project Gender Considerations/Mainstreaming: Indicate how the project takes into
account gender considerations/mainstreaming. For more guidance on how to integrate gender
considerations/mainstreaming into project proposals please see the box 10 below.
5.6 PROJECT 1. One of the main objectives of the project is to develop an understanding by
GENDER the Parties and stakeholders on the issue of gender equality. In particular,
CONSIDERATI within the context of Stockholm and Rotterdam Conventions, activities such
ONS / as analyzing issues in the scope of the Stockholm Conventions from a
M AINSTREAM gender perspective, including identifying vulnerable groups and different
ING impacts of hazardous chemicals and wastes on men and women, boys and
girls will be undertaken. The activities will promote the consideration of
*
Please gender issues in hazardous chemicals and waste management at the
consult the national and regional levels, which is a unique initiative undertaken at the
application country level through this project. Gender awareness and gender analysis
guidelines programs are rarely funded by Government budgets or provided on a
(p. 13) regular basis to train new staff or build existing gender mainstreaming
available on capacity. This activity will help build new capacity and promote inclusion of
Special gender equality related perspectives in policies and programs at national
Programme level.
website to
complete 2. Raising awareness of the health impacts of chemical exposure on women
this section. and children as vulnerable populations, including creating opportunities for
training, sharing experiences and collecting relevant sex disaggregated
data.
3. Promoting women’s engagement and leadership in decision making
processes at national and global levels.
Box 9: Example of the project gender consideration/ mainstreaming component
22
Unedited advance copy
In relation to the involvement of women and vulnerable groups, UNDP’s guidance on Chemicals and
Genderi recommends two overarching interventions to guide gender mainstreaming in chemical
management:
a) Promote a multi-stakeholder approach to ensure the participation of women and vulnerable
populations in policy development and decision-making processes.
b) Raise awareness of the linkages between chemical exposures, the effects on human health and
the environment, and gender differences in risks and impact
Attention should therefore be paid to gender issues in the project in the Special Programme on the
basis of two perspectives. One is in institutional development and the other is differences in risks
when women and men are exposed to chemicals and waste.
With regard to institutional development, the systems should as far as possible be designed so that an
even general distribution and equality at the workplace can be attained. In many countries there is a
relatively large group of women who have relevant training to work in the area and there are good
prospects for a good balance between the institutions. However, this does not apply in all countries,
and attention must therefore be paid to these issues.
Exposure to chemicals and affects both women and men. Men’s exposure to chemicals has
traditionally received greater attention, and research has been focused to a greater extent on men
and harm that can occur in them. Despite deficiencies in the research, there is a great deal of
evidence to suggest that women in poor countries are exposed to hazardous chemicals to an extent
that may be just as great as in the case of men. This applies in the home, in agriculture and to an
increasing extent in industrial work and in work linked to recovery of metals from electronics, for
example. Women and men also exhibit differing sensitivity to chemicals due to physiological
differences. It is particularly serious that children and pregnant women are exposed to hazardous
chemicals, as foetuses and children are in many cases more prone to the effects of chemicals than
adults and exposure at an early age, which may cause lasting damage for example to the nervous
system and reproductive capacity.
1 UNDP 2011, Gender Mainstreaming Guidance Series: Chemicals and gender
Box 10: Guidance on gender considerations/mainstreaming
5.7 Monitoring and Evaluation Plan and Financial Audit: The evaluation plan should
indicate the arrangements for the independent monitoring and evaluation on project
implementationxi, determine the steps for regular monitoring and the final evaluation. Upon
completion of the project, a final project assessment should be undertaken.xii For projects
involving no intergovernmental organization as a project implementing organisation, a final
financial audit will also be required. These arrangements should not represent a high
percentage of the budget of the project nor be a complex mechanism due to the scale of the
project. A person and/or institution should be identified in application form I. The evaluation
plan must be based on the project work plan and objectives identified in the project
description. Project activities and progress should be monitored and outcomes should be
xi Proponents are reminded that the independent monitoring and evaluation on project implementation
to the Executive Board of the Special Programme will be the responsibility of the project proponent.
xii For projects of less than 12 months, only one final report would be required.
23
Unedited advance copy
reported. The monitoring and evaluation should also include a number of indicators or targets.
Such indicators may include:
(i) Performance of the project against its defined objectives;
(ii) Performance against the Special Programme objective and strategic priorities;
(iii) Capacity of the project to target its beneficiaries;
(iv) Stakeholders and sectoral involvement in the project implementation;
(v) Sustainability of the project and follow-up;
(vi) The contribution of the project to the national chemicals and waste management
framework.
Monitoring and evaluation, and financial audit should be listed as a separate output in the
work plan and budget. As noted in Sections 2.4 and 2.5, the budget for monitoring, evaluation
and audit should not be higher than a maximum total of US$ 15,000.
5.8 Project workplan: Please present a project workplan using the table included in Form IB.
The work plan is an important tool for formulating and implementing a project. From the work
plan, it is possible to assess the proposed implementation of the project, as follows:
- Are the time horizons realistic (for approval, negotiation with cooperating agencies or
supporting organizations, delivery of outputs and administration)?
- Is the work load reasonably balanced?
- Are any activities likely to be held up by the timing of other activities?
5.8 PROJECT WORKPLAN*
Rows and columns can be added as required, please note that the number and descriptions of project
activities have to be in line with the ones reflected in project description
Lead
Project Activities responsi Timeframe (by quarter – every 3 months)
bility
No 1 2 3 4 5 6 7 9 9 10 11 12
Description
.
1 Establishment MoE
and
operationalisation
of the Project
Management Unit
1.1 Project
Management Unit
established
1.2 Inception
workshop held
Box 11: Example of the project workplan
24
Unedited advance copy
A well-prepared work plan is particularly useful for monitoring and evaluation. The work plan
is used in the progress report as the reference point for assessing the project’s progress.
As well as being an indicator of progress, the work plan also highlights difficulties likely to be
encountered in project implementation, identifies backlogs or bottlenecks, and facilitates
advance planning to resolve the anticipated problems.
III. Annex I of “Form IB Project Description”: Additional Project Information
6.1 Information about GEF related projects
Include a description of GEF funded projects on chemicals and waste, including the project
number, title and objective of the project. The description should indicate the status of the
project, i.e. ongoing or completed and the relevant dates. The description should state why
activities being proposed for funding through the Special Programme fall outside the mandate
of the GEF in their view. The description should also include what actions related to
institutional strengthening and capacity building are being undertaken by GEF projects on
chemicals and waste in the country. The GEF operational focal point for the country should
be consulted in developing this project.
6.2 Description of projects on institutional strengthening on chemicals and waste
management undertaken in the past, currently being implemented or planned in the
future to be implemented in the country(ies) and/or region
Include a description of projects on institutional strengthening on chemicals and waste
management undertaken in the past, currently being implemented or planned in the future to
be implemented in the country(ies) and/or region. If any, please complete the table for
previous projects. Please provide details on the timeframe, funding and framework of such
projects, as well as details on how the outcome of the previous and ongoing projects can
support or build upon the outcomes of the proposed Special Programme project.
Please explain on how the project will expand on the work of previous projects.
6.3 Other relevant information about the project according to your country’s needs
Please also provide any additional relevant information about the project according to your
country’s needs.
(i) Mainstreaming of the sound management of chemicals and waste in various sectors;
(ii) Promotion of enhanced coordination and cooperation at the national level to
implement the Basel, Rotterdam and Stockholm Conventions, the Minamata
Convention and the Strategic Approach to International Chemicals Management;
(iii) Whether the project builds upon previous initiatives and institutional mechanisms
already established;
(iv) Whether the project may have a regional impact, in line with the objectives of the
Special Programme;
25
Unedited advance copy
(v) Participation and commitment of relevant actors and sectors, including agriculture,
environment, health, labour, industry and other relevant sectors in the
implementation of the measures proposedxiii.
IV. Project Application Form II (Budget Tables)
The Special Programme Trust Fund may provide support from US$ 50,000 to US$ 250,000
per project proposal. In exceptional circumstances, an applicant country may request up to a
maximum of US$ 500,000. Project requesting more than US$ 250,000 should adhere to the
criteria as described in section 6 of the guidelines.
Provide all figures in US dollars ($) and per year. Budgets in other currencies will not be
considered. Budgets should reflect the amount requested from the Special Programme trust
fund, as well as other financial or in-kind contributions.xiv
Form II includes the following tables (each table is on a separate sheet in the excel table):
Table 1: Budget summary
Please summarize funding or in-kind contribution from all sources of funding.
Table 2: Special Programme Trust Fund Budget by Year/Commitment Class (US$)
Please list the cost for each proposed measure/output and activity on a separate line,
noting that the columns refer to different class codes, e.g. staff and other personnel, travel,
contractual services, etc. in accordance with UNEP financial rules and regulations. The table
should only present the cost that is covered by the Special Programme Trust Fund.
Table 3: Beneficiary contribution budget by Year/Commitment Class (US$)
Please provide the budget for the beneficiary contribution from the government. If possible,
provide the breakdown of the budget by proposed measure/output and activity. Table 3 will
present the details about the contribution from other sources including from the beneficiary
government, noting that in paragraph 21 of the terms of reference of the Special Programme
“beneficiary countries will contribute resources equal to the value of at least 25 per cent of the
total allocationxv”, other intergovernmental organizations, non-government organizations and
private sectors, as appropriate.
Table 4: Class Explanation
This table provides examples for the class codes, e.g. Class Code: travel includes workshops
and meetings, and so on.
xiii This section will need to be fleshed out and is very important for projects that are requesting US
$500,000.
xiv Such “costs” should also be reflected as in-kind contributions in the “funding summary” section under
“value of resources contributed by beneficiary country” on page 2 of the application form I.
xv The Executive Board may reduce that percentage, commensurate with consideration of the specific
national circumstances, capacity constraints, gaps and needs of the applicant.
26
Unedited advance copy
Note: The following guidance on specific budget classes:
- It is expected that those applicant countries that decide to manage projects themselves
should be able to ensure project management without having to devote funds from the
Special Programme for administrative costs. In duly justified circumstances, a maximum
5% for administrative fees, could be considered, notably if a project implementing
organization is tasked with project management.
- Personnel and contractual services cost should not exceed 50% of the requested amount
for the Special Programme Trust Fund.
- As enhancing institutional capacity requires a minimum level of commitment notably from
an administrative and logistical perspective, it is also expected that applicant countries will
provide the necessary administrative and logistical support. Therefore, normal operational
and running costs such as office equipment, premises, vehicles, fuel, etc. will not be
eligible for support. In duly justified circumstances, a maximum 10% for specialised and
technical equipment costs could be considered.
- The budget for monitoring, evaluation and audit shall all together have a maximum total
of US$ 15,000.
Not all costs are eligible for support. Examples of categories of costs that must be excluded
from amounts sought from the Special Programme trust fund:
- Recurrent or running institutional costs, including the rental of office space;
- Costs not directly related to institutional strengthening at the national level towards the
objective of the programme;
- Wages for civil servants;
- Hospitality costs, for example in connection with receptions given for participants in
conferences, seminars, etc.;
- Office equipment and furniture, vehicles, fuel, electricity, etc.;
- Costs for individual items which are disproportionate to the total project budget. If such
costs are part of the project, they must be mentioned in the budgets and provided by other
funding sources.
“Additional documents”
Please add in annex to the budget separate information requested specifically for some
budget items, including:
- Job descriptions and descriptions of the recruitment process for project personnel;
- Terms of reference and descriptions of the recruitment process for consultants;
- Information regarding group trainings, such as the tentative dates, venue and number of
participants, costs of travel and daily subsistence;
- Information regarding meetings and conference, such as the tentative dates, venue and
number of participants, costs of travel and daily subsistence; and
- A list of non-expendable equipment, including the estimated costs.
27
Unedited advance copy
11. What will happen next?
The Secretariat will acknowledge receipt of the application package, no later than one week
of receipt.
Screening by the Special Programme secretariat
The application will be screened by the Special Programme secretariat to make sure it is
complete and eligible for support. Once screened by the secretariat, the applicant will be
informed if the application is considered complete and eligible ad interim and can be reviewed
by the Special Programme Executive Board.
During the screening process, the secretariat may request for additional information or
clarification from the applicant, in order to facilitate the eligibility and completeness process.
Appraisal by the Secretariat
The appraisal by the Secretariat will be done in consultation with the Secretariat of the Basel,
Rotterdam and Stockholm Conventions, the Secretariat of the Minamata Convention, the
SAICM Secretariat, and the Secretariat of the Global Environment Facility, and partners to
IOMC as appropriate. The secretariat will submit their report of the complete and eligible
proposals as well as their appraisal to the Executive Board to their annual meeting for review
and consideration.
Approval by the Special Programme Executive Board
The Executive Board will review all the complete and eligible project proposals, taking into
account the appraisal undertaken by the Secretariat during their annual meeting and approve
projects subject to the availability of funds.
Notification
The applicant will be notified in writing by the secretariat of the Executive Board’s decision.
Implementation arrangements
Activities financed by the Special Programme trust fund will be implemented in accordance
with the project management arrangements approved by the Executive Board. Project
management arrangements will include the conversion of applications into relevant legal
instruments, which would form the basis of a signed funding agreement between the project
proponent and UN Environment as the trust fund administrator. Financial and reporting
arrangements will be set up with the project manager.
_______________
28
Unedited advance copy
Annex I: Schematic on the project development process for the 3rd round of
applications (23 February – 21 June 2018)
CALL FOR APPLICATION 23rd Feb, 2018
Development of the project
Development of the project concept
Consultation with relevant Ministries and
stakeholders to identify national priorities,
gaps and challenges in meeting the
implementing the MEAs and SAICM
Consult with additional sources such as the
Basel, Rotterdam, Stockholm Conventions,
LIRA Guidelines, GEF (including
consultation with the GEF focal point) and
Guidance on Gender mainstreaming
Complete application forms
in English
Application guidelines will also be
available in Arabic, French and
Spanish Obtain the necessary supporting
documentation from project partners
Submit the signed electronic version of the
application and the supporting
documentation to the secretariat by email
no later than 21 June 2018
Mail the completed
application package
Mail the signed application package to the
secretariat of the Special Programme
The package should include:
o Form I (A, B and Annex)
o Form II
o Endorsement letter from the Special
Programme Official focal point
o Beneficiary contribution letter
o Supporting letters from project partners
o Other supporting documents (terms of
reference for consultants, etc.)
i
Unedited advance copy
APPLICATION DEADLINE 21 JUNE 2018
Appraisal process by the Special
Programme Secretariat
FEEDBACK SENT BY THE SECRETARIAT Mid- August 2018
Revision and submission of
the final application
Revise the application taking on board the
feedback and comments provided by the
secretariat
Consult with project partners and relevant
stakeholders
Consult with the secretariat for further
guidance
Resubmit the final application to the
secretariat by mid-September 2018
FINAL APPLICATION DEADLINE Mid-September 2018
Decision by the Executive
Board at the 4th meeting, end
November / beginning
December 2018
ii
Unedited advance copy
Annex II: Terms of Reference for the Special Programme16
Terms of reference for the Special Programme to support institutional strengthening
at the national level for implementation of the Basel, Rotterdam and Stockholm
conventions, the Minamata Convention and the Strategic Approach to International
Chemicals Management
Recalling decision 27/12 on chemicals and waste management, part VIII, paragraphs
13 and 14 of the First Universal Session of the Governing Council/Global Ministerial
Environment Forum of the United Nations Environment Programme (UNEP):
I. Objective of the Special Programme
1. The objective of the Special Programme is to support country-driven institutional
strengthening at the national level, in the context of an integrated approach to address the
financing of the sound management of chemicals and wastes, taking into account the national
development strategies, plans and priorities of each country, to increase sustainable public
institutional capacity for the sound management of chemicals and wastes throughout their life
cycle. Institutional strengthening under the Special Programme will facilitate and enable the
implementation of the Basel, Rotterdam and Stockholm conventions, the Minamata
Convention and the Strategic Approach to International Chemicals Management (hereinafter
referred to as “the Instruments”).
II. Definition of institutional strengthening
2. For the purposes of the Special Programme, institutional strengthening is defined as
enhancing the sustainable institutional capacity of Governments to develop, adopt, monitor
and enforce policy, legislation and regulation, as well as to gain access to financial and other
resources for effective frameworks for the implementation of the Instruments for the sound
management of chemicals and wastes throughout their life cycle.
III. Expected outcomes of institutional strengthening through the Special
Programme
3. It is expected that strengthened national institutions would have the capacity to do the
following:
(a) Develop and monitor the implementation of national policies, strategies, programmes
and legislation for the sound management of chemicals and wastes;
(b) Promote the adoption, monitoring and enforcement of legislation and regulatory
frameworks for the sound management of chemicals and wastes;
(c) Promote the mainstreaming of the sound management of chemicals and wastes into
national development plans, national budgets, policies, legislation and implementation
frameworks at all levels, including addressing gaps and avoiding duplication;
(d) Work in a multisectoral, effective, efficient, transparent, accountable and sustainable
manner in the long term;
16 UNEA-1 Resolution 1/5, Annex II
iii
Unedited advance copy
(e) Facilitate multisectoral and multi-stakeholder cooperation and coordination at the
national level;
(f) Promote private sector responsibility, accountability and involvement;
(g) Promote the effective implementation of the Basel, Rotterdam and Stockholm
conventions, the Minamata Convention and the Strategic Approach;
(h) Promote cooperative and coordinated implementation of the Instruments at the
national level.
IV. Scope of the Special Programme
4. The Special Programme should avoid duplication and proliferation of funding
mechanisms and associated administration, and should fund activities that fall outside
the mandate of the Global Environment Facility.
5. The activities funded under the Special Programme may encompass the following:
(a) Identifying national institutional capacity, weaknesses, gaps and needs, as well as
strengthening the institutional capacity to do so, where required;
(b) Strengthening institutional capacity to plan, develop, undertake, monitor and
coordinate the implementation of policies, strategies and national programmes for the
sound management of chemicals and wastes;
(c) Strengthening institutional capacity to improve progress reporting and performance
evaluation capabilities;
(d) Promoting an enabling environment to foster the ratification of the Basel, Rotterdam
and Stockholm conventions and the Minamata Convention;
(e) Enabling the design and operation of institutional structures dedicated to the promotion
of the sound management of chemicals and wastes throughout their life cycle;
(f) Strengthening institutional capacity to promote measures to support all aspects of the
sound management of chemicals and wastes, including more specific nationally
identified thematic areas covered by the Instruments.
V. Eligibility for support from the Special Programme
6. Support from the Special Programme will be available for developing countries, taking
into account the special needs of least developed countries and small island developing
States, and for countries with economies in transition, with priority given to those with least
capacity.
7. Applicants will be eligible if they are party to any one of the relevant conventions or
have demonstrated that they are in the process of preparing for ratification of any one of the
conventions.
8. Applications will include identification of the associated domestic measures to be taken
to ensure that the national institutional capacity supported by the Special Programme is
sustainable in the long term.
VI. Governance arrangements for the Special Programme
9. An Executive Board will be the decision-making body and oversee the Special
Programme with the support of a secretariat.
iv
Unedited advance copy
10. The Executive Board will reflect a balance between donors and recipients. The term
of the representatives will be in a two-year rotation. The Executive Board will be composed of
the following:
(a) Four representatives of recipient countries, reflecting equitable, geographical
representation, drawn from the following United Nations regions: Africa, Asia-Pacific,
Central and Eastern Europe, and Latin America and the Caribbean. In addition, the
Executive Board will have one representative from a least developed country or a small
island developing State on a rotational basis;
(b) Five donor representatives, which are not also recipient countries.
11. The executive secretaries of the Secretariat of the Basel, Rotterdam and Stockholm
conventions and the Minamata Convention, the Coordinator of the Strategic Approach and a
representative of the secretariat of the Global Environment Facility, as well as representatives
of Governments and regional economic integration organizations, any implementing agencies
and one representative from each of the Bureaus of the governing bodies of the Instruments
may participate, at their own expense, as observers at the meetings of the Executive Board.
VII. Mandate and functions of the Executive Board
12. The Executive Board will have two co-chairs, one from recipient countries and one
from donor countries.
13. The Executive Board will meet yearly and take its decisions by consensus wherever
possible. If consensus cannot be reached, the Executive Board will, as a last resort, take its
decisions by a two-thirds majority of its members present and voting. The Executive Board
will, as required, further develop its rules of procedure at its first meeting.
14. The Executive Board will take operational decisions regarding the functioning of the
Special Programme, including the approval of applications for funding, and will endorse
procedures for application, assessment, reporting and evaluation. The Executive Board will
provide operational guidance on the implementation of the Special Programme and will
provide advice on other matters as required.
VIII. Administering organization
15. As the administering organization, UNEP will provide a Special Programme trust fund
and a secretariat to deliver administrative support to the Programme, including the allocation
of human and other resources.
16. The secretariat will process application proposals for approval by the Executive Board,
manage approved allocations and service the Executive Board. The Secretariat will report on
its operations to the Executive Board and will be accountable to the Executive Director of
UNEP for administrative and financial matters. The secretariat will submit an annual report to
the Executive Board, which will also be sent to the governing bodies of UNEP and of the
Instruments for their consideration.
v
Unedited advance copy
IX. Operational arrangements for the Special Programme
17. The Special Programme will receive applications directly from national Governments.
It will be easily accessible, simple and effective, and draw on experience from existing support
mechanisms as appropriate.
18. Applications should be outlined within the context of an overall country approach to
strengthening institutional capacity. The applications should contain proposed measures and
performance targets, and information relating to long-term sustainability.
19. Applications should be submitted to the secretariat. The secretariat will appraise
applications for consideration and decision by the Executive Board.
20. Cumulative allocations to a country should be decided by the Executive Board, based
on the contributions received and the needs expressed in the applications submitted. Of that
total, an amount not exceeding 13 per cent may be retained for administrative purposes.
21. Beneficiary countries will contribute resources equal to the value of at least 25 per cent
of the total allocation. The Executive Board may reduce that percentage, commensurate with
consideration of the specific national circumstances, capacity constraints, gaps and needs of
the applicant.
22. Beneficiary countries shall submit annual reports on progress achieved. A final report
and financial audit shall be submitted upon completion of each project, which shall include a
full accounting of funds used and an evaluation of outcomes, as well as evidence as to
whether the performance targets have been met.
X. Contributions
23. Contributions will be encouraged from all signatories and parties to the conventions
and other Governments with the capacity to do so, as well as from the private sector, including
industry, foundations, other non-governmental organizations and other stakeholders.
XI. Duration of the Special Programme
24. The Special Programme will be open to receive voluntary contributions and
applications for support for seven years from the date it is established. On the basis of a
satisfactory review and evaluation, and subject to a recommendation from the Executive
Board to the United Nations Environment Assembly, the Special Programme may be eligible
for a one-time extension, not to exceed an additional five years. Special Programme funds
may be disbursed for a maximum of 10 years from the date the Programme is established, or
eight years from the date it is extended, if applicable, at which point the Programme will
complete its operations and close. The terms of reference of the above-mentioned review and
evaluation are to be decided by the Executive Board.
vi
SPECIAL PROGRAMME
TRUST FUND
Project Application Form IA
Project Proposal Summary
Project No:
For Official Use Only
Note Applications should all be endorsed by the relevant ministry where the project will be executed.
1 PROJECT PROPOSAL SUMMARY
1.1 PROJECT TITLE
1.2 DURATION ________________________ months
Developing Country Least Developed Country SIDS CEITs
Please provide details relevant for your country for the conventions listed below.
COUNTRY
1.3 Your country is a Party to:
STATUS Basel Rotterdam Stockholm Minamata
Your country is in the process of preparing for ratification of:
Basel Rotterdam Stockholm Minamata
PROJECT EXECUTIVE Approximately 250 words
1.4
SUMMARY
List the concrete measures or activities proposed for support (add number of proposed measures,
as appropriate)
PROPOSED Proposed measure 1:
1.5
MEASURES Proposed measure 2:
Proposed measure 3:
Proposed measure 4:
Proposed measure 5: Monitoring and evaluation and financial audit
EXPLAIN HOW EACH Proposed measure 1:
PROPOSED Proposed measure 2:
1.6 Proposed measure 3:
MEASURE WILL
Proposed measure 4:
ADDRESS
1
INSTITUTIONAL
STRENGTHENING
List the concrete associated domestic measures to be taken to ensure that the national institutional
capacity supported by the Special Programme is sustainable in the long term (ddd number of
ASSOCIATED associated domestic measures, as appropriate)
1.7 DOMESTIC Associated domestic measure 1:
MEASURES Associated domestic measure 2:
Associated domestic measure 3:
Associated domestic measure 4:
EXPLAIN HOW THE Associated domestic measure 1:
ASSOCIATED Associated domestic measure 2:
Associated domestic measure 3:
DOMESTIC
Associated domestic measure 4:
MEASURES WILL
1.8
ADDRESS THE
SUSTAINABILITY OF
INSTITUTIONAL
STRENGTHENING
1.9 SUMMARY OF
OVERALL COUNTRY
APPROACH TO
INSTITUTIONAL
STRENGTHENING
(§18 TOR)
1.10 BUDGET AND Requested from the Beneficiary contribution
FUNDING SUMMARY SPTF
Proposed measure 1 $ $
Proposed measure 2 $ $
Proposed measure 3 $ $
Proposed measure 4 $ $
Proposed measure 5: Monitoring, $ $
evaluation & financial audit
Sub-total $ $
Total project budget =$
(Add number of proposed measures, as appropriate)
1.11 ADDITIONAL
INFORMATION Has the contribution from the beneficiary country been confirmed? Yes No
REGARDING ALL
FUNDING SOURCES* Has funding been received or requested from the GEF for the similar or Yes No
related proposed measures and activities?
* If any, please
complete the table If so, please provide all relevant information about the related GEF project or
application in Annex I
2
“Additional
Has this project or the activities proposed previously been submitted for Yes No
Contributions”
funding from Special Programme?
included in Application
Form II – Project
budget Has this project or the activities proposed previously been submitted for Yes No
funding or in-kind donations from other sources, in addition to the previous
question regarding GEF funding or applications?
Yes No
If so, are they still awaiting confirmation?
Is the viability of the project dependent on confirmation of funding or in-kind
contribution that is not confirmed yet in addition to the Special Programme Yes No
trust fund?
2 CONTACT DETAILS
2.1 APPLICANT Applicant organization /
institution
Mr. Applicant representative
Ms. (name)
Functional Title
Section / Department
Address
Phone
Fax
E-Mail
Website address
(if available)
PROJECT
IMPLEMENTING Project implementing
2.2 ORGANIZATION/INSTITU organization / institution
TION (IF RELEVANT)
Mr. Implementing
Ms. representative (name)
Functional Title
3
Section / Department
Address
Phone
Fax
E-Mail
Website address
(if available)
2.3 PROJECT For each partner, please provide the following information
PARTNERS (ADD
ROWS FOR EACH
PROJECT PARTNER) Name of the organization
(s)
Contact person (s)
E-Mail
Organizations’ role in the
*Indicate the specific tasks for each organization
project:
2.4 INDEPENDENT Organization
MONITORING AND
EVALUATION OF
THE PROJECT Contact person
Functional Title
Section / Department
Address
Phone
Fax
E-mail
4
2.5 FINANCIAL AUDIT
Organization
Contact details
Functional Title
Section / Department
Address
Phone
Fax
E-mail
3 APPLICATION CHECKLIST OF ESSENTIAL ELEMENTS BEFORE SUBMISSION
ARE ALL OF THE FOLLOWING ELEMENTS INCLUDED IN YOUR APPLICATION?
A complete and signed Application Form IA - including a record of Government endorsement by the
relevant ministry
A complete Application Form IB – Project Description
A complete Application Form II – Project Budget
Endorsement letter from the Official focal point
Letters of support from the project partners confirming its/their role(s)
Information and list of GEF related projects or applications (Form IB - Annex I)
Projects with an implementing organization/institution, a letter from the organization/institution confirming its
role (if relevant)
Annexes providing any relevant additional information regarding the measures and activities to be funded
Proof of funding from beneficiary country and other project funding
5
4 ENDORSEMENT AND CERTIFICATION
4.1 OFFICIAL FOCAL POINT
RECORD OF ENDORSEMENT ON BEHALF OF THE GOVERNMENT
Mr.
Name
Ms.
Functional Title
Institution/ Department / Section
Organization
E-mail
I, the Official focal point for the Special Programme for _________________________ (country name)
confirm the validity and relevance of the proposed project in relation to national priorities for chemicals and waste
management
Date and Signature
4.2 APPLICANT CERTIFICATION
I certify that the information provided in this application, including all enclosures, is accurate and relevant to national
priorities in chemicals management, in line with the Special Programme to support institutional strengthening at the
national level to enhance the implementation of the Basel, Rotterdam and Stockholm conventions, the Minamata
Convention on Mercury and the Strategic Approach to International Chemicals Management (SAICM). I confirm that
should this project be approved initial management arrangements should be concluded between UNEP, as trustee,
and the designated project implementing body or agency. I also note that should this project be approved, the
Special Programme secretariat will make the relevant project details publicly available via the Special Programme
website.
Mr.
Name and title
Ms.
Date and signature
6
SPECIAL PROGRAMME
TRUST FUND
Project Application Form IB
Project Description
Please consult the application guidelines (p. 15) available on the Special Programme website
Note (https://www.unenvironment.org/explore-topics/chemicals-waste/what-we-do/special-programme) to complete
this form.
5 PROJECT DESCRIPTION
5.1 DETAILED DESCRIPTION OF EACH
PROPOSED MEASURE (SEE List the concrete measures or activities proposed for support (add number of
proposed measures as appropriate)
SECTION 1.5 ABOVE)
Proposed measure 1:
Proposed measure 2:
Proposed measure 3:
Proposed measure 4:
Proposed measure 5: Monitoring and evaluation and financial audit
7
5.2 DETAILED DESCRIPTION OF THE
ASSOCIATED DOMESTIC
MEASURES
(SEE SECTION 1.7 ABOVE)
5.3 DETAILED INFORMATION ON
PROJECT MANAGEMENT AND
IMPLEMENTATION
8
5.4 PROJECT DESCRIPTION (LOG FRAME)
5.4.1 1. Overall project Indicators Means of verification
outcome
Insert the overall project outcome [All indicators should have a measurable Baseline and Target listed in Insert both data source and method for measuring progress against
brackets] indicator target
Performance targets (project milestones that show progress towards completing the project outputs and achieving the overall project outcome) Expected Milestone for each
reporting period (annual)
Milestone1 Insert Insert Month/Year
M2 Insert Insert Month/Year
M3 Insert Insert Month/Year
… Insert Insert Month/Year …
5.4.2 2. Project Indicators Means of verification
Activity/Output
A) Insert first project activity/output Insert Indicator (plus measurable baseline and target in brackets) Insert both data source and method for measuring progress against
indicator target
Project activity/output Milestones: Expected Milestone for each
reporting period (annual)
M1 Insert one milestone for the first six-month period for the first project activity/output Insert Month/Year
M2 Insert one milestone for the second six-month period for the first project activity/output Insert Month/Year
M3 Insert one milestone for the third six-month period for the first project activity/output Insert Month/Year
1 Performance Targets / Milestones: Are benchmarks (not activities) that represent attainment of a project stage or project achievement that show progress towards project outcomes and outputs. Milestone
attainment should be strictly answerable with a “yes” or “No” answer.
Outcome milestone will often show progress on a particular outcome indicator target, but can also be a major significance benchmark , believed to lead to the outcome
9
… Insert Insert Month/Year …
3. Project Indicators Means of verification
Activity/Output
A) Insert second project activity/output Insert Indicator (plus measurable baseline and target in brackets) Insert both data source and method for measuring progress against
indicator target
Project activity/output Milestones: Expected Milestone for each
reporting period (annual)
M1 Insert one milestone for the first six-month period for the first project activity/output Insert Month/Year
M2 Insert one milestone for the second six-month period for the first project activity/output Insert Month/Year
M3 Insert one milestone for the third six-month period for the first project activity/output Insert Month/Year
… Insert InsertMonth/Year …
10
5.5 PROJECT ASSUMPTIONS
Risk 1:
Mitigation measure 1:
Risk 2:
Mitigation measure 2:
5.6 PROJECT GENDER
CONSIDERATIONS /
MAINSTREAMING
* Please consult the application
guidelines (p. 22 - 23) available on
Special Programme website to complete
this section.
5.7 MONITORING AND
EVALUATION PLAN AND
FINANCIAL AUDIT*
* Please consult the application
guidelines (p. 23-24) available on
Special Programme website to complete
this section.
11
5.8 PROJECT WORKPLAN*
Rows and columns can be added as required, please note that the number and descriptions of project activities have to be in line with the ones reflected
in project description (log frame)
* Please consult the application guidelines (p. 24) available on Special Programme website to complete this section.
Project Activities Lead responsibility Timeframe (by quarter – every 3 months)
No. Description
1 2 3 4 5 6 7 9 9 10 11 12
1
1.1
1.2
1.3
2
2.1
2.2
3
…
12
SPECIAL PROGRAMME
TRUST FUND
Project Application Form IB
ANNEX I: Additional Project Information
6 ADDITIONAL PROJECT INFORMATION
6.1 INFORMATION Table for related GEF projects
ABOUT GEF
GEF Project Status of the Provide List the Has the GEF
RELATED PROJECTS number, title and project (ongoing or information on why institutional operational focal
objective completed and the proposed strengthening point been
relevant dates) measures fall and capacity consulted?
outside mandate building activities
of the GEF undertaken
through GEF
projects
6.2 DESCRIPTION OF Table for previous projects on institutional strengthening on chemicals and waste management undertaken
in the past, currently being implementation or planned in the future to be implemented in the country(ies)
OTHER PROJECTS and/or region
ON INSTITUTIONAL
STRENGTHENING ON Previous Projects Time Frame Funding Received Linkage Achievement/
CHEMICALS AND Lessons learned
WASTE
MANAGEMENT
6.3 OTHER RELEVANT
INFORMATION
ABOUT THE
PROJECT
ACCORDING TO
YOUR COUNTRY’S
NEEDS
13
Special Programme Trust Fund: Project Application Form II - Project Budget
Budget Summary (refer to application guidelines Pages 26 - 27)
TYPE OF
SOURCE OF FUNDING Details Year 1 Year 2 Year 3 Total
FUNDING
Special Programme Trust Fund
SPTF (SPTF)
TOTAL SPTF BUDGET - - - -
Beneficiary contribution -
BENEFICIARY
Other (include name of donor) -
CONTRIBUTION
TOTAL IN-KIND BUDGET - - - -
TOTAL
TOTAL PROJECT BUDGET - - - -
Special Programme Trust Fund: Project Application Form II - Project Budget
Project Title:
Sponso Project Output Activity Activities Staff and Other Personnel Costs Contractual Services Equipment Travel Grand Total
r No. (FT30_010) (FT30_120) (FT30_135) (FT30_160)
Year 1 Year 2 Year 3 Year 1 Year 2 Year 3 Year 1 Year 2 Year 3 Year 1 Year 2 Year 3
Output 1:
1,1 0
1,2 0
1,3 0
1,4 0
1,5 0
1,6 0
Sub-total for Output 1 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Output 2:
2,1 0
Special Programme Trust Fund (SPTF)
2,3 0
2,4 0
Sub-total for Output 2 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Output 3:
3,1 0
3,2 0
3,3 0
3,4 0
3,5 0
Sub-total for Output 3 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Output 4:
4,1 0
4,2 0
4,3 0
4,4 0
4,5 0
Sub-total for Output 4 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Output 5: Monitoring, evaluation and financial audit
5,1 0
5,2 0
5,3 0
Sub-total for Output 5 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Subtotal eligible costs [secured] 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Administrative costs (5% of the total eligible costs below)*
Total eligible costs [Secured] 0 0 0 0 0 0 0 0 0 0 0 0 0
*Refer to the application guidelines page 27
Special Programme Trust Fund: Project Application Form II - Project Budget
Project Title:
Source of Project Output / Activities Staff and Other Costs Operating costs (office space, transport, Grand Total
Funds equipment, communications)
Year 1 Year 2 Year 3 Year 1 Year 2 Year 3
contribution
Beneficiary
Output 1: 0
Output 2: 0
Output 3: 0
Output 4: 0
Output 5: 0
Total beneficiary contribution costs 0 0 0 0 0 0 0
S. Commitment Class Name Explanation
No. Commitment Class
1 FT30_Class_010 Staff and Other Personnel Costs (i) Includes all costs and entitlements of personnel including staff, consultants, adminstrative staff, interns.
(ii) Meeting facilitators, interpreters, Evaluation consultants all to be budgeted under this Class.
FT30_Class_120 Contractual Services (i) Works and services of a commercial nature contracted following procurement procedures. This could include contracts given to
NGOs if they are more similar to procurement of services than a grant transfer.
(ii) Where meetings/workshops require venue to be hired e.g Hotel, then relevant costs to be budgeted under this Class.
(iii) Commercial printing/publication contracts to be budgeted here
FT30_Class_135 Equipment Vehicles and Furniture (i) Procurement of non-consumables e.g. IT equipment.
2 FT30_Class_160 Travel i) Includes staff/consultant/meeting participant travel [per diem/tickets as applicable]
(ii) Road / train /Fuel and vehicle/boat rental costs for staff, consultants and other project personnel
Dear SAICM National Focal Points,
Please find below the official announcement of the launch of the third round of applications for the Special
Programme on institutional strengthening at the national level to support the implementation of the Basel,
Rotterdam and Stockholm conventions, the Minamata Convention and SAICM.
Please find attached a letter from the Executive Director and its annexes, announcing the launch and
providing details on the application process.
Kind regards,
______________________________________________________________________________
Lina Fortelius
Associate Programme Officer
SAICM Secretariat
Chemicals and Health Branch
Economy Division
UN Environment
International Environment House 1
Geneva, Switzerland
Telephone: +41 22 917 8191
[email protected]
www.unep.org
www.saicm.org
From: Monica_Mutira/UNEP/NBO/UNO%UNON
[mailto:Monica_Mutira/UNEP/NBO/UNO%
[email protected]] On Behalf Of UNEP SGB
Sent: 14 March 2018 3:50 PM
To:
[email protected];
[email protected]; GenevamissionUN <
[email protected]>
Cc:
[email protected]
Subject: Launch of the third round of applications for the Special Programme on institutional
strengthening at the national level to support the implementation of the Basel, Rotterdam and
Stockholm conventions, the Minamata Convention and SAICM (UNEA Resolution...
Ref: Committee Note No: 0057(2018)
Excellency,
On behalf of Mr. Erik Solheim, Executive Director of UN Environment Programme I have the honour to
inform you of the launch of the third round of applications for the Special Programme on institutional
strengthening at the national level to support the implementation of the Basel, Rotterdam and Stockholm
Conventions, the Minamata Convention and the Strategic Approach to International Chemicals
Management.
Please find attached a letter from the Executive Director and its annexes, announcing the launch and
providing details on the application process.
Please accept, Excellency, the assurances of my highest consideration.
Jorge Laguna-Celis
Secretary of Governing Bodies
UN Environment Programme
Tel: +254 20 762 3411. Mobile: +254 (0) 7090 23411
E-mail:
[email protected], Twitter: twitter.com/jorgelaguna
(See attached file: SP_ED letter to governments_launch of the 3rd call for applications -
fi....pdf)(See attached file: Annex 1_Special Programme_ED letter to governments_launch of the
3rd call for applications - final.pdf)(See attached file: Annex 2_Special
Programme_Project_Application_Guidelines_version 1.3.pdf)
(See attached file: Annex 3_Special Programme_Project_Application_Form
I_AB_version_1.3.docx)(See attached file: Annex 4_Special
Programme_Project_Application_Form II_version_1.3.xls)
Executive Office
Reference: Economy Division/Special Programme/3rd Application Round 1 March 2018
Dear Minister,
I am delighted to call for applications from Governments who wish their national institutions to benefit from
the Special Programme Trust Fund to strengthen implementation of the Basel, Rotterdam and Stockholm
Conventions, the Minamata Convention on Mercury, and the Strategic Approach to International Chemicals
Management.
I would like to sincerely thank the donors who have already contributed to the Fund and its Secretariat. I
would also like to invite all parties to the Conventions and other Governments both to contribute and to
encourage partners in the private sector and civil society to do the same.
Further details on the process to submit applications before the 21 June 2018 deadline are attached.
We very much look forward to working with you on tackling chemicals and waste issues.
Best wishes,
Erik Solheim
Executive Director
To: Ministers for Environment of all Member Countries of the UN Environment Assembly
cc: Permanent Missions to UN Environment Programme
Permanent Missions to the United Nations in New York and Geneva
Attachments:
(1) Annex 1
(2) Project application guidelines
(3) Project application form
(4) Project application budget form
United Nations Avenue, Gigiri
P O Box 30552, 00100 Nairobi, Kenya
Tel +254 20 762 4001 |
[email protected]
www.une p.org
Executive Office
Annex 1:
In 2014, the first UN Environment Assembly, under resolution 1/5, Governments adopted terms of reference
for a Special Programme to strengthen national institutions implementing the Basel, Rotterdam and
Stockholm Conventions, the Minamata Convention on Mercury and the Strategic Approach to International
Chemicals Management.
Applications can be submitted directly from national governments as follows:
1. Support from the Special Programme will be available for developing countries, taking into account the
special needs of Least Developed Countries and Small Island Developing States, and for countries with
economies in transition, with priority given to those with least capacity;
2. Applicants will be eligible if they are party to any one of the relevant conventions or have demonstrated
that they are in the process of preparing for ratification of any one of the conventions; and
3. Applications will include identification of the associated domestic measures to be taken to ensure that
the national institutional capacity supported by the Special Programme is sustainable in the long term.
The first and second rounds of applications to the Fund were successfully implemented in 2016 and 2017.
In December, the third meeting of the Executive Board approved 17 projects and agreed to revise the
application guidelines and forms to reflect the lessons learned from the first and second rounds.
These revised documents, which include advice on the information required and the steps to follow, are
attached here and available on the Special Programme website:
http://web.unep.org/chemicalsandwaste/special-programme.
(a) Application guidelines
(b) Application Form IA– project summary; Form IB – project description
(c) Application Form II – project budget
Advance versions of the second and third Executive Board meeting reports are also available on the
website: https://www.unenvironment.org/explore-topics/chemicals-waste/what-we-do/special-
programme.
Please note that the deadline for applications is 21 June 2018 and do not hesitate to contact the
Secretariat if you require any additional information. Completed application forms should be sent to:
Special Programme Secretariat
c/o Chemicals and Waste Branch, Economy Division
11-13 Chemin des Anémones
International Environment House
CH-1219 Châtelaine
Geneva, Switzerland
Tel: +41 22 917 83 43
E- mail:
[email protected]
United Nations Avenue, Gigiri
P O Box 30552, 00100 Nairobi, Kenya
Tel +254 20 762 4001 |
[email protected]