Reply to the consultation on Capacity Remuneration Mechanism for Lithuania

Majandus- ja Kommunikatsiooniministeerium · 22. mai 2020
Viit
17-4/2020/3365-1
Registreeritud
22. mai 2020
Dokumendi liik
Väljaminev kiri
Adressaat
Ministry of Energy of the Republic of Lithuania, Konkurentsiamet, Elering AS
Saabumis/saatmisviis
e-post, DVK
Funktsioon
17 Energeetikaalase tegevuse korraldamine
Sari
17-4 Energiaturuga seotud kirjavahetus (elekter, gaas, kütus) (Arhiiviväärtuslik)
Toimik
17-4/2020
Vastutaja
Rein Vaks (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Energeetika valdkond, Energeetikaosakond)

Failid

  • 📎17-420203365-1 22.05.2020 Väljaminev kiri.bdoc223 KB

Sisu (failidest)

Egidijus Purlys Ministry of Energy of the Republic of Lithuania Our Ref: 22.05.2020 No 17-4/2020/3365-1 Gedimino av. 38 LT-01104, Vilnius Reply to the consultation on Capacity Remuneration Mechanism for Lithuania Dear Mr. Purlys, The Lithuanian Ministry for Energy launched a public consultation in terms of the planned Capacity Remuneration Mechanism. The public hearing of the measure was held on the 12th May 2020 with a view to collect any written comments by 22nd May 2020. Please find the written comments from the Estonian side as follows. As an overall argument we note that the mechanism should have lowest possible distortion effect on the whole region. Therefore, the mechanism at hand must be well justified and based on transparent criteria. Furthermore, if the mechanism is proven to be needed, the outcome must ensure a minimum distortion on the electricity market. Taking into account the information provided within the framework of the consultation and the overspill effect of the measure at hand, Estonia needs further information to assess the effect of the measure to the local electricity market. The latest ENTSO-E adequacy analysis (MAF2019) does not show an adequacy problem for Lithuania exceeding Lithuanian adequacy standard of 8 hours per year. However, during the consultation a national analysis was mentioned, which concludes an adequacy problem in Lithuania. Based on Regulation (EU) 2019/943, if national analysis shows an adequacy problem and EU study does not, then the differences between the studies should be analyzed and published. Hence, please provide us with a copy of the relevant analysis. Secondly, based on Regulation (EU) 2019/943, effects of the capacity mechanism need to be consulted with the stakeholders of neighboring countries. We urge including also market participants (i.e. producers) in the public consultation, as they are also relevant stakeholders. In order to assess the impact of the capacity mechanism to particular Member State, it is important to know the details of cross-border participation in the mechanism. Could you please describe more the details of cross-border participation and point us to the material on cross-border Suur-Ameerika 1 / 10122 Tallinn / ESTONIA Phone: +372 625 6342 / Fax: +372 631 3660 / E-mail: [email protected] / http://www.mkm.ee participation details? Regulation (EU) 2019/943 Article 21(2) are stated that before introducing capacity mechanisms, the Member States concerned shall conduct a comprehensive study of the possible effects of such mechanisms on the neighboring Member States by consulting at least its neighboring Member States to which they have a direct network connection and the stakeholders of those Member States. Therefore, according the regulation the involvement of direct neighboring countries is the minimum requirement, meaning that involvement of wider region is possible and favorable. Taken into account that Baltic States are in one synchronous area, the electricity systems are strongly linked together, both from technical side as well as from market side (connected with each other through several AC power lines, common synchronization task, common balancing market, etc) it seems that from technical perspective as well as from market perspective it would make sense if additionally to direct neighboring countries the market participants from the whole Baltic region could participate in Lithuanian CRM auction. Also, it is unclear if the market participants offering CRM from neighboring countries have to have the production also in the neighboring country or they can be suppliers having the production unit in other country (for example supplier in Latvia who has power plants in Estonia). Could you please elaborate on that? With best regards, Timo Tatar Deputy Secretary General for Energy Rein Vaks +372 625 6347 [email protected] Copy to: Estonian Competition Authority Elering AS 2 (2)