dokumendiregister.ee
OtsingAsutusedMCP
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel
Otsing›Sotsiaalministeerium
Muu lepingAvalik

Leping

Sotsiaalministeerium · 3. jaanuar 2018
Viit
2-2.1/477-1
Registreeritud
3. jaanuar 2018
Dokumendi liik
Muu leping
Funktsioon
2 Välisabi ja struktuuritoetuste rakendamine
Sari
2-2.1 Välisabi vahenditest rahastatavate projektide lepingud koos aktidega
Toimik
2-2.1
Vastutaja
Maarja Kärson (Sotsiaalministeerium, Kantsleri vastutusvaldkond, Sotsiaalala asekantsleri vastutusvaldkond, Laste heaolu osakond)

Failid

  • 📎Grant Agreement-764255-BADEV.pdf2647 KB

Sisu (failidest)

Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 EUROPEAN COMMISSION Directorate General Justice and Consumers Programme and financial management GRANT AGREEMENT NUMBER — 764255 — BADEV This Agreement (‘the Agreement’) is between the following parties: on the one part, the European Union (‘the EU’), represented by the European Commission ('the Commission'), represented for the purposes of signature of this Agreement by Daniela BANKIER, Head of Unit, DIRECTORATE-GENERAL JUSTICE AND CONSUMERS , Programme and financial management, and on the other part, 1. ‘the coordinator’: SOTSIAALMINISTEERIUM (MSAE), established in Suur-Ameerika 1, TALLINN 10122, Estonia, represented for the purposes of signing the Agreement by Marika PRISKE and the following other beneficiaries, if they sign their ‘Accession Form’ (see Annex 3 and Article 40): 2. NODIBINAJUMS CENTRS DARDEDZE (Centrs Dardedze), established in CIECERES IELA 3A, RIGA LV-1002, Latvia, 3. FUNDACJA DAJEMY DZIECIOM SILE (FDDS), established in UL. WALECZNYCH 59, WARSZAWA 03 926, Poland, VAT number: PL1130725676, Unless otherwise specified, references to ‘beneficiary’ or ‘beneficiaries’ include the coordinator. The parties referred to above have agreed to enter into the Agreement under the terms and conditions below. By signing the Agreement or the Accession Form, the beneficiaries accept the grant and agree to implement the action under their own responsibility and in accordance with the Agreement, with all the obligations and conditions it sets out. 1 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 The Agreement is composed of: Terms and Conditions Annex 1 Description of the action Annex 2 Estimated budget for the action Annex 2a Not applicable Annex 3 Accession Forms Annex 4 Model for the financial statements Annex 5 Model for the certificate on the financial statements (CFS) Annex 6 Not applicable 2 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 TERMS AND CONDITIONS TABLE OF CONTENTS CHAPTER 1 GENERAL ............................................................................................................................................... 8 ARTICLE 1 — SUBJECT OF THE AGREEMENT ....................................................................................... 8 CHAPTER 2 ACTION ...................................................................................................................................................8 ARTICLE 2 — ACTION TO BE IMPLEMENTED ........................................................................................8 ARTICLE 3 — DURATION AND STARTING DATE OF THE ACTION .....................................................8 ARTICLE 4 — ESTIMATED BUDGET AND BUDGET TRANSFERS ....................................................... 8 4.1 Estimated budget .................................................................................................................................... 8 4.2 Budget transfers ..................................................................................................................................... 8 CHAPTER 3 GRANT .................................................................................................................................................... 8 ARTICLE 5 — GRANT AMOUNT, FORM OF GRANT, REIMBURSEMENT RATE AND FORMS OF COSTS ............................................................................................................................................ 8 5.1 Maximum grant amount .........................................................................................................................8 5.2 Form of grant, reimbursement rates and forms of costs ........................................................................9 5.3 Final grant amount — Calculation ........................................................................................................ 9 5.4 Revised final grant amount — Calculation ......................................................................................... 10 ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS ...............................................................................11 6.1 General conditions for costs to be eligible ..........................................................................................11 6.2 Specific conditions for costs to be eligible ......................................................................................... 12 6.3 Conditions for costs of affiliated entities to be eligible ...................................................................... 14 6.4 Ineligible costs ..................................................................................................................................... 14 6.5 Consequences of declaration of ineligible costs ..................................................................................15 CHAPTER 4 RIGHTS AND OBLIGATIONS OF THE PARTIES ........................................................................ 15 SECTION 1 RIGHTS AND OBLIGATIONS RELATED TO IMPLEMENTING THE ACTION ................ 15 ARTICLE 7 — GENERAL OBLIGATION TO PROPERLY IMPLEMENT THE ACTION ........................15 7.1 General obligation to properly implement the action ..........................................................................16 7.2 Consequences of non-compliance ........................................................................................................16 ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD PARTY INVOLVED IN THE ACTION ....................................................................................................................................... 16 ARTICLE 8a — IMPLEMENTATION OF ACTION TASKS BY BENEFICIARIES NOT RECEIVING EU FUNDING .....................................................................................................................................16 ARTICLE 9 — PURCHASE OF GOODS, WORKS OR SERVICES ...........................................................16 3 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 9.1 Rules for purchasing goods, works or services ................................................................................... 16 9.2 Consequences of non-compliance ........................................................................................................17 ARTICLE 10 — IMPLEMENTATION OF ACTION TASKS BY SUBCONTRACTORS .......................... 17 10.1 Rules for subcontracting action tasks ................................................................................................ 17 10.2 Consequences of non-compliance ......................................................................................................18 ARTICLE 11 — IMPLEMENTATION OF ACTION TASKS BY AFFILIATED ENTITIES ...................... 18 ARTICLE 11a — FINANCIAL SUPPORT TO THIRD PARTIES ............................................................... 18 11a.1 Rules for providing financial support to third parties ......................................................................18 11a.2 Financial support in the form of prizes ............................................................................................18 11a.3 Consequences of non-compliance .................................................................................................... 18 SECTION 2 RIGHTS AND OBLIGATIONS RELATED TO THE GRANT ADMINISTRATION .............. 18 ARTICLE 12 — GENERAL OBLIGATION TO INFORM .......................................................................... 18 12.1 General obligation to provide information upon request ...................................................................18 12.2 Obligation to keep information up to date and to inform about events and circumstances likely to affect the Agreement ..........................................................................................................................19 12.3 Consequences of non-compliance ......................................................................................................19 ARTICLE 13 — KEEPING RECORDS — SUPPORTING DOCUMENTATION ....................................... 19 13.1 Obligation to keep records and other supporting documentation ...................................................... 19 13.2 Consequences of non-compliance ......................................................................................................20 ARTICLE 14 — SUBMISSION OF DELIVERABLES ................................................................................ 20 14.1 Obligation to submit deliverables ...................................................................................................... 20 14.2 Consequences of non-compliance ......................................................................................................21 ARTICLE 15 — REPORTING — PAYMENT REQUESTS .........................................................................21 15.1 Obligation to submit reports .............................................................................................................. 21 15.2 Reporting periods ............................................................................................................................... 21 15.2a Request(s) for further pre-financing payment(s) ..............................................................................21 15.3 Periodic reports — Requests for interim payments ...........................................................................21 15.4 Final report — Request for payment of the balance ......................................................................... 21 15.5 Information on cumulative expenditure incurred .............................................................................. 22 15.6 Currency for financial statements and conversion into euro ............................................................. 22 15.7 Language of reports ........................................................................................................................... 23 15.8 Consequences of non-compliance ......................................................................................................23 ARTICLE 16 — PAYMENTS AND PAYMENT ARRANGEMENTS .........................................................23 16.1 Payments to be made ......................................................................................................................... 23 4 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 16.2 Pre-financing payment(s) — Amount ................................................................................................23 16.3 Interim payments — Amount — Calculation ................................................................................... 23 16.4 Payment of the balance — Amount — Calculation .......................................................................... 24 16.5 Notification of amounts due .............................................................................................................. 24 16.6 Currency for payments .......................................................................................................................24 16.7 Payments to the coordinator — Distribution to the beneficiaries ......................................................24 16.8 Bank account for payments ............................................................................................................... 25 16.9 Costs of payment transfers ................................................................................................................ 25 16.10 Date of payment ...............................................................................................................................25 16.11 Consequences of non-compliance ....................................................................................................25 ARTICLE 17 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF FINDINGS ....................................................................................................................................26 17.1 Checks, reviews and audits by the Commission ............................................................................... 26 17.2 Investigations by the European Anti-Fraud Office (OLAF) ..............................................................28 17.3 Checks and audits by the European Court of Auditors (ECA) ..........................................................28 17.4 Checks, reviews, audits and investigations for international organisations ....................................... 28 17.5 Consequences of findings in checks, reviews, audits and investigations — Extension of findings ..............................................................................................................................................................28 17.6 Consequences of non-compliance ......................................................................................................30 ARTICLE 18 — EVALUATION OF THE IMPACT OF THE ACTION ...................................................... 30 18.1 Right to evaluate the impact of the action ........................................................................................ 30 18.2 Consequences of non-compliance ......................................................................................................30 SECTION 3 OTHER RIGHTS AND OBLIGATIONS .......................................................................................30 ARTICLE 19 — PRE-EXISTING RIGHTS AND OWNERSHIP OF THE RESULTS (INCLUDING INTELLECTUAL AND INDUSTRIAL PROPERTY RIGHTS) ................................................ 31 19.1 Pre-existing rights and access rights to pre-existing rights ............................................................... 31 19.2 Ownership of results and rights of use ..............................................................................................31 19.3 Consequences of non-compliance ......................................................................................................31 ARTICLE 20 — CONFLICT OF INTERESTS ............................................................................................. 31 20.1 Obligation to avoid a conflict of interests ......................................................................................... 31 20.2 Consequences of non-compliance ......................................................................................................31 ARTICLE 21 — CONFIDENTIALITY ......................................................................................................... 32 21.1 General obligation to maintain confidentiality .................................................................................. 32 21.2 Consequences of non-compliance ......................................................................................................32 ARTICLE 22 — PROMOTING THE ACTION — VISIBILITY OF EU FUNDING ...................................32 5 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 22.1 Communication activities by the beneficiaries .................................................................................. 32 22.2 Communication activities by the Commission .................................................................................. 33 22.3 Consequences of non-compliance ......................................................................................................34 ARTICLE 23 — PROCESSING OF PERSONAL DATA ............................................................................. 34 23.1 Processing of personal data by the Commission ............................................................................... 34 23.2 Processing of personal data by the beneficiaries ...............................................................................34 23.3 Consequences of non-compliance ......................................................................................................35 ARTICLE 24 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE COMMISSION ..........35 CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES ....................................... 35 ARTICLE 25 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES ...........................35 25.1 Roles and responsibilities towards the Commission ......................................................................... 35 25.2 Internal division of roles and responsibilities ....................................................................................35 25.3 Internal arrangements between beneficiaries — Consortium agreement ...........................................36 CHAPTER 6 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY — SANCTIONS — DAMAGES — SUSPENSION — TERMINATION — FORCE MAJEURE ............................... 37 SECTION 1 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY — SANCTIONS .............................................................................................................................................37 ARTICLE 26 — REJECTION OF INELIGIBLE COSTS .............................................................................37 26.1 Conditions ...........................................................................................................................................37 26.2 Ineligible costs to be rejected — Calculation — Procedure ..............................................................37 26.3 Effects .................................................................................................................................................37 ARTICLE 27 — REDUCTION OF THE GRANT ........................................................................................ 37 27.1 Conditions ...........................................................................................................................................38 27.2 Amount to be reduced — Calculation — Procedure .........................................................................38 27.3 Effects .................................................................................................................................................38 ARTICLE 28 — RECOVERY OF UNDUE AMOUNTS ..............................................................................38 28.1 Amount to be recovered — Calculation — Procedure ......................................................................38 ARTICLE 29 — ADMINISTRATIVE SANCTIONS .................................................................................... 41 SECTION 2 LIABILITY FOR DAMAGES ........................................................................................................ 41 ARTICLE 30 — LIABILITY FOR DAMAGES ............................................................................................41 30.1 Liability of the Commission .............................................................................................................. 41 30.2 Liability of the beneficiaries ..............................................................................................................41 SECTION 3 SUSPENSION AND TERMINATION ............................................................................................41 ARTICLE 31 — SUSPENSION OF PAYMENT DEADLINE ......................................................................41 31.1 Conditions ...........................................................................................................................................41 6 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 31.2 Procedure ............................................................................................................................................ 41 ARTICLE 32 — SUSPENSION OF PAYMENTS ........................................................................................ 42 32.1 Conditions ...........................................................................................................................................42 32.2 Procedure ............................................................................................................................................ 42 ARTICLE 33 — SUSPENSION OF THE ACTION IMPLEMENTATION ..................................................43 33.1 Suspension of the action implementation, by the beneficiaries .........................................................43 33.2 Suspension of the action implementation, by the Commission .........................................................43 ARTICLE 34 — TERMINATION OF THE AGREEMENT OR OF THE PARTICIPATION OF ONE OR MORE BENEFICIARIES ............................................................................................................ 44 34.1 Termination of the Agreement, by the beneficiaries ......................................................................... 45 34.2 Termination of the participation of one or more beneficiaries, by the beneficiaries ..........................45 34.3 Termination of the Agreement or of the participation of one or more beneficiaries, by the Commission ........................................................................................................................................ 46 SECTION 4 FORCE MAJEURE ..........................................................................................................................49 ARTICLE 35 — FORCE MAJEURE .............................................................................................................49 CHAPTER 7 FINAL PROVISIONS .......................................................................................................................... 50 ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES ............................................................. 50 36.1 Form and means of communication .................................................................................................. 50 36.2 Date of communication ......................................................................................................................50 36.3 Addresses for communication ............................................................................................................51 ARTICLE 37 — INTERPRETATION OF THE AGREEMENT ................................................................... 51 37.1 Precedence of the Terms and Conditions over the Annexes ............................................................. 51 37.2 Privileges and immunities ..................................................................................................................51 ARTICLE 38 — CALCULATION OF PERIODS, DATES AND DEADLINES .......................................... 51 ARTICLE 39 — AMENDMENTS TO THE AGREEMENT ........................................................................ 51 39.1 Conditions ...........................................................................................................................................51 39.2 Procedure ............................................................................................................................................ 52 ARTICLE 40 — ACCESSION TO THE AGREEMENT .............................................................................. 52 40.1 Accession of the beneficiaries mentioned in the Preamble ............................................................... 52 40.2 Addition of new beneficiaries ............................................................................................................53 ARTICLE 41 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES ............................................. 53 41.1 Applicable law ................................................................................................................................... 53 41.2 Dispute settlement .............................................................................................................................. 53 ARTICLE 42 — ENTRY INTO FORCE OF THE AGREEMENT ............................................................... 54 7 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 CHAPTER 1 GENERAL ARTICLE 1 — SUBJECT OF THE AGREEMENT This Agreement sets out the rights and obligations and the terms and conditions applicable to the grant awarded to the beneficiaries for implementing the action set out in Chapter 2. CHAPTER 2 ACTION ARTICLE 2 — ACTION TO BE IMPLEMENTED The grant is awarded for the action entitled ‘Enhancing Barnahus model service delivery in Estonia, Latvia and Poland — BADEV’ (‘action’), as described in Annex 1. ARTICLE 3 — DURATION AND STARTING DATE OF THE ACTION The duration of the action will be 24 months as of 01/02/2018 (‘starting date of the action’). ARTICLE 4 — ESTIMATED BUDGET AND BUDGET TRANSFERS 4.1 Estimated budget The ‘estimated budget’ for the action is set out in Annex 2. It contains the estimated eligible costs and the forms of costs, broken down by beneficiary and budget category (see Articles 5, 6). 4.2 Budget transfers The estimated budget breakdown indicated in Annex 2 may be adjusted — without an amendment (see Article 39) — by transfers of amounts between beneficiaries, budget categories and/or forms of costs set out in Annex 2, if the action is implemented as described in Annex 1. However : - the beneficiaries may not add costs relating to subcontracts not provided for in Annex 1, unless such additional subcontracts are approved by an amendment or in accordance with Article 10; - the transfers between budget categories must stay below 20% of the total costs for the action set out in Annex 2, unless they are approved by an amendment. CHAPTER 3 GRANT ARTICLE 5 — GRANT AMOUNT, FORM OF GRANT, REIMBURSEMENT RATE AND FORMS OF COSTS 5.1 Maximum grant amount 8 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 The ‘maximum grant amount’ is EUR 292,764.60 (two hundred and ninety two thousand seven hundred and sixty four EURO and sixty eurocents). 5.2 Form of grant, reimbursement rate and forms of costs The grant reimburses 80% of the action’s eligible costs (see Article 6) (‘reimbursement of eligible costs grant’) (see Annex 2). The estimated eligible costs of the action are EUR 365,957.12 (three hundred and sixty five thousand nine hundred and fifty seven EURO and twelve eurocents). Eligible costs (see Article 6) must be declared under the following forms ('forms of costs' or ‘cost forms’): (a) for direct personnel costs: as actually incurred costs (‘actual costs’) (b) for direct travel and subsistence costs: as actually incurred costs (actual costs); (c) for direct costs of subcontracting: as actually incurred costs (actual costs); (d) for direct costs of providing financial support to third parties: not applicable; (e) for other direct costs: as actually incurred costs (‘actual costs’); (f) for indirect costs: on the basis of a flat-rate applied as set out in Article 6.2.Point F (‘flat-rate costs’); 5.3 Final grant amount — Calculation The ‘final grant amount’ depends on the actual extent to which the action is implemented in accordance with the Agreement’s terms and conditions. This amount is calculated by the Commission — when the payment of the balance is made — in the following steps: Step 1 – Application of the reimbursement rate to the eligible costs Step 2 – Limit to the maximum grant amount Step 3 – Reduction due to the no-profit rule Step 4 – Reduction due to substantial errors, irregularities or fraud or serious breach of obligations 5.3.1 Step 1 — Application of the reimbursement rate to the eligible costs The reimbursement rate (see Article 5.2) is applied to the eligible costs (actual costs and flat-rate costs; see Article 6) declared by the beneficiaries (see Article 15) and approved by the Commission (see Article 16). 5.3.2 Step 2 — Limit to the maximum grant amount 9 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 If the amount obtained following Step 1 is higher than the maximum grant amount set out in Article 5.1, it will be limited to the latter. 5.3.3 Step 3 — Reduction due to the no-profit rule The grant must not produce a profit. ‘Profit’ means the surplus of the amount obtained following Steps 1 and 2 plus the action’s total receipts, over the action’s total eligible costs. The ‘action’s total eligible costs’ are the consolidated total eligible costs approved by the Commission. The ‘action’s total receipts’ are the consolidated total receipts generated during its duration (see Article 3). The following are considered receipts: (a) income generated by the action; (b) financial contributions given by third parties to the beneficiary, specifically to be used for costs that are eligible under the action. The following are however not considered receipts: (a) financial contributions by third parties, if they may be used to cover costs other than the eligible costs (see Article 6); (b) financial contributions by third parties with no obligation to repay any amount unused at the end of the period set out in Article 3. If there is a profit, it will be deducted in proportion to the final rate of reimbursement of the eligible actual costs approved by the Commission (as compared to the amount calculated following Steps 1 and 2). 5.3.4 Step 4 — Reduction due to substantial errors, irregularities or fraud or serious breach of obligations If the grant is reduced (see Article 27), the Commission will calculate the reduced grant amount by deducting the amount of the reduction (calculated in proportion to the seriousness of the errors, irregularities or fraud or breach of obligations, in accordance with Article 27.2) from the maximum grant amount set out in Article 5.1. The final grant amount will be the lower of the following two: - the amount obtained following Steps 1 to 3 or - the reduced grant amount following Step 4. 5.4 Revised final grant amount — Calculation If — after the payment of the balance (in particular, after checks, reviews, audits or investigations; 10 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 see Article 17) — the Commission rejects costs (see Article 26) or reduces the grant (see Article 27), it will calculate the ‘revised final grant amount’ for the action or for the beneficiary concerned. This amount is calculated by the Commission on the basis of the findings, as follows: - in case of rejection of costs: by applying the reimbursement rate to the revised eligible costs approved by the Commission for the beneficiary concerned; - in case of reduction of the grant: by deducting the amount of the reduction (calculated in proportion to the seriousness of the substantial errors, irregularities or fraud or breach of obligations, in accordance with Article 27.2) from the maximum grant amount set out in Article 5.1 or from the maximum EU contribution indicated for the beneficiary in the estimated budget (see Annex 2). In case of rejection of costs and reduction of the grant, the revised final grant amount will be the lower of the two amounts above. ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS 6.1 General conditions for costs to be eligible ‘Eligible costs’ are costs that meet the following criteria: (a) for actual costs: (i) they must be actually incurred by the beneficiary; (ii) they must be incurred in the period set out in Article 3, with the exception of costs relating to the submission of the final report (see Article 15); (iii) they must be indicated in the estimated budget set out in Annex 2; (iv) they must be incurred in connection with the action as described in Annex 1 and necessary for its implementation; (v) they must be identifiable and verifiable, in particular recorded in the beneficiary’s accounts in accordance with the accounting standards applicable in the country where the beneficiary is established and with the beneficiary’s usual cost accounting practices; (vi) they must comply with the applicable national law on taxes, labour and social security, and (vii) they must be reasonable, justified and must comply with the principle of sound financial management, in particular regarding economy and efficiency; (b) for unit costs: not applicable; (c) for flat-rate costs: (i) they must be calculated by applying the flat-rate set out in Annex 2, and 11 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 (ii) the costs (actual costs) to which the flat-rate is applied must comply with the conditions for eligibility set out in this Article; (d) for lump sum costs: not applicable. 6.2 Specific conditions for costs to be eligible Costs are eligible if they comply with the general conditions (see above) and the specific conditions set out below, for each of the following budget categories: A. direct personnel costs; B. direct travel and subsistence costs; C. direct costs of subcontracting; D. not applicable; E. other direct costs. F. indirect costs. ‘Direct costs’ are costs that are directly linked to the action implementation and can therefore be attributed to it directly. They must not include any indirect costs (see Point F below). ‘Indirect costs’ are costs that are not directly linked to the action implementation and therefore cannot be attributed directly to it. A. Direct personnel costs Types of eligible personnel costs A.1 Personnel costs are eligible if they are related to personnel working for the beneficiary under an employment contract (or equivalent appointing act) and assigned to the action (‘costs for employees (or equivalent)’). They must be limited to salaries, social security contributions, taxes and other costs included in the remuneration, if they arise from national law or the employment contract (or equivalent appointing act). They may also include additional remuneration for personnel assigned to the action (including payments on the basis of supplementary contracts regardless of their nature), if: (a) it is part of the beneficiary’s usual remuneration practices and is paid in a consistent manner whenever the same kind of work or expertise is required; (b) the criteria used to calculate the supplementary payments are objective and generally applied by the beneficiary, regardless of the source of funding used. A.2 The costs for natural persons working under a direct contract with the beneficiary other than an employment contract or seconded by a third party against payment are eligible personnel costs, if: (a) the person works under the beneficiary’s instructions and, unless otherwise agreed with the beneficiary, on the beneficiary’s premises; (b) the result of the work carried out belongs to the beneficiary, and 12 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 (c) the costs are not significantly different from those for personnel performing similar tasks under an employment contract with the beneficiary. Calculation Personnel costs must be calculated by the beneficiaries as follows: {hourly rate multiplied by number of actual hours worked on the action}. The number of actual hours declared for a person must be identifiable and verifiable (see Article 13). The total number of hours declared in EU or Euratom grants, for a person for a year, cannot be higher than the annual productive hours used for the calculations of the hourly rate. Therefore, the maximum number of hours that can be declared for the grant are: {number of annual productive hours for the year (see below) minus total number of hours declared by the beneficiary, for that person for that year, for other EU or Euratom grants}. The ‘hourly rate’ is the calculated as follows: {actual annual personnel costs for the person divided by number of individual annual productive hours}. using the personnel costs and the number of annual productive hours for each full financial year covered by the reporting period concerned. If a financial year is not closed at the end of the reporting period, the beneficiaries must use the hourly rate of the last closed financial year available. The ‘number of individual annual productive hours’ is the total actual hours worked by the person in the year. It may not include holidays and other absences (such as sick leave, maternity leave, special leave, etc). However, it may include overtime and hours spent in meetings, trainings and other similar activities. B. Direct travel and subsistence costs Travel and subsistence costs (including related duties, taxes and charges, such as non-deductible value added tax (VAT) paid by beneficiaries that are not public bodies acting as public authority) are eligible if they are in line with the beneficiary’s usual practices on travel. C. Direct costs of subcontracting (including related duties, taxes and charges, such as non-deductible value added tax (VAT) paid by beneficiaries that areis not public bodies acting as public authority) are eligible if the conditions in Article 10.1.1 are met. D. Direct costs of providing financial support to third parties 13 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 Not applicable E. Other direct costs E.1 The depreciation costs of equipment, infrastructure or other assets (new or second-hand) as recorded in the beneficiary’s accounts are eligible, if they were purchased in accordance with Article 9.1.1 and written off in accordance with international accounting standards and the beneficiary’s usual accounting practices. The costs of renting or leasing equipment, infrastructure or other assets (including related duties, taxes and charges, such as non-deductible value added tax (VAT) paid by beneficiaries that are not public bodies acting as public authority) are also eligible, if they do not exceed the depreciation costs of similar equipment, infrastructure or assets and do not include any financing fees. The only portion of the costs that will be taken into account is that which corresponds to the duration of the action and rate of actual use for the purposes of the action. E.2 Costs of other goods and services (including related duties, taxes and charges, such as non- deductible value added tax (VAT) paid by beneficiaries that are not public bodies acting as public authority) are eligible, if they are purchased specifically for the action and in accordance with Article 9.1.1. Such goods and services include, for instance, consumables and supplies, dissemination, protection of results, certificates on the financial statements (if they are required by the Agreement), translations and publications. F. Indirect costs Indirect costs are eligible if they are declared on the basis of the flat-rate of 7% of the eligible direct costs (see Article 5.2 and Points A to E above). Beneficiaries receiving an operating grant1 financed by the EU or Euratom budget cannot declare indirect costs for the period covered by the operating grant. 6.3 Conditions for costs of affiliated entities to be eligible Not applicable 6.4 Ineligible costs ‘Ineligible costs’ are: (a) costs that do not comply with the conditions set out above (Article 6.1 to 6.3), in particular: 1 For the definition, see Article 121(1)(b) of Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing Council Regulation (EC, Euratom) No 1605/2002 (OJ L 218, 26.10.2012, p.1) (‘Financial Regulation No 966/2012’): ‘operating grant’ means direct financial contribution, by way of donation, from the budget in order to finance the functioning of a body which pursues an aim of general EU interest or has an objective forming part of and supporting an EU policy. 14 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 (i) costs related to return on capital; (ii) debt and debt service charges; (iii) provisions for future losses or debts; (iv) interest owed; (v) doubtful debts; (vi) currency exchange losses; (vii) bank costs charged by the beneficiary’s bank for transfers from the Commission; (viii)excessive or reckless expenditure; (ix) deductible VAT; (x) costs incurred during suspension of the implementation of the action (see Article 33); (xi) in-kind contributions provided by third parties; (b) costs declared under another EU or Euratom grant (including grants awarded by a Member State and financed by the EU or Euratom budget and grants awarded by bodies other than the Commission for the purpose of implementing the EU or Euratom budget); in particular, indirect costs if the beneficiary is already receiving an operating grant financed by the EU or Euratom budget in the same period; (c) costs for staff of a national (or local) administration, for activities that are part of the administration’s normal activities (i.e. not undertaken only because of the grant); (d) costs (especially travel and subsistence costs) for staff or representatives of EU institutions, bodies or agencies; (e) costs for activities that do not take place in one of the eligible countries set out in the call for proposals — unless approved by the Commission. 6.5 Consequences of declaration of ineligible costs Declared costs that are ineligible will be rejected (see Article 26). This may also lead to any of the other measures described in Chapter 6. CHAPTER 4 RIGHTS AND OBLIGATIONS OF THE PARTIES SECTION 1 RIGHTS AND OBLIGATIONS RELATED TO IMPLEMENTING THE ACTION ARTICLE 7 — GENERAL OBLIGATION TO PROPERLY IMPLEMENT THE ACTION 15 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 7.1 General obligation to properly implement the action The beneficiaries must implement the action as described in Annex 1 and in compliance with the provisions of the Agreement and all legal obligations under applicable EU, international and national law. 7.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 27). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD PARTY INVOLVED IN THE ACTION The beneficiaries must have the appropriate resources to implement the action. If it is necessary to implement the action, the beneficiaries may: - purchase goods, works and services (see Article 9); - call upon subcontractors to implement action tasks described in Annex 1 (see Article 10). In these cases, the beneficiaries retain sole responsibility towards the Commission and the other beneficiaries for implementing the action. ARTICLE 8a — IMPLEMENTATION OF ACTION TASKS BY BENEFICIARIES NOT RECEIVING EU FUNDING Not applicable ARTICLE 9 — PURCHASE OF GOODS, WORKS OR SERVICES 9.1 Rules for purchasing goods, works or services 9.1.1 If necessary to implement the action, the beneficiaries may purchase goods, works or services. The beneficiaries must make such purchases ensuring the best value for money or, if appropriate, the lowest price. In doing so, they must avoid any conflict of interests (see Article 20). The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 17 and 18 also towards their contractors. 16 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 9.1.2 Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC2 (or 2014/24/EU3) or ‘contracting entities’ within the meaning of Directive 2004/17/EC4 (or 2014/25/EU5) must comply with the applicable national law on public procurement. 9.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under Article 9.1.1, the costs related to the contract concerned will be ineligible (see Article 6) and will be rejected (see Article 26). If a beneficiary breaches any of its obligations under Article 9.1.2, the grant may be reduced (see Article 27). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 10 — IMPLEMENTATION OF ACTION TASKS BY SUBCONTRACTORS 10.1 Rules for subcontracting action tasks 10.1.1 If necessary to implement the action, the beneficiaries may award subcontracts covering the implementation of certain action tasks described in Annex 1. Subcontracting may cover only a limited part of the action. The beneficiaries must award the subcontracts ensuring the best value for money or, if appropriate, the lowest price. In doing so, they must avoid any conflict of interests (see Article 20). The tasks to be implemented and the estimated cost for each subcontract must be set out in Annex 1 and the total estimated costs of subcontracting per beneficiary must be set out in Annex 2. The Commission may however approve subcontracts not set out in Annex 1 and 2 without amendment (see Article 39), if: - they are specifically justified in the technical report and - they do not entail changes to the Agreement which would call into question the decision awarding the grant or breach the principle of equal treatment of applicants. The beneficiaries must ensure that the subcontracted work is performed in one of the eligible countries set out in the call for proposals (‘place of performance obligation’) — unless otherwise approved by the Commission. 2 Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public work contracts, public supply contracts and public service contracts (OJ L 134, 30.04.2004, p. 114). 3 Directive 2014/24/EU of the European Parliament and of the Council of 26 February 2014 on public procurement and repealing Directive 2004/18/EC (OJ L 94, 28.3.2014, p. 65). 4 Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the procurement procedures of entities operating in the water, energy, transport and postal services sectors (OJ L 134, 30.04.2004, p. 1). 5 Directive 2014/25/EU of the European Parliament and of the Council of 26 February 2014 on procurement by entities operating in the water, energy, transport and postal services sectors and repealing Directive 2004/17/EC (OJ L 94, 28.3.2014, p. 243). 17 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the European Anti-Fraud Office (OLAF) can exercise their rights under Articles 17 and 18 also towards their subcontractors. 10.1.2 The beneficiaries must ensure that their obligations under Articles 20, 21, 22 and 30 also apply to the subcontractors. Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC (or 2014/24/EU) or ‘contracting entities’ within the meaning of Directive 2004/17/EC (or 2014/25/EU) must comply with the applicable national law on public procurement. 10.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under Article 10.1.1, the costs related to the subcontract concerned will be ineligible (see Article 6) and will be rejected (see Article 26). If a beneficiary breaches any of its obligations under Article 10.1.2, the grant may be reduced (see Article 27). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 11 — IMPLEMENTATION OF ACTION TASKS BY AFFILIATED ENTITIES Not applicable ARTICLE 11a — FINANCIAL SUPPORT TO THIRD PARTIES 11a.1 Rules for providing financial support to third parties Not applicable 11a.2 Financial support in the form of prizes Not applicable 11a.3 Consequences of non-compliance Not applicable SECTION 2 RIGHTS AND OBLIGATIONS RELATED TO THE GRANT ADMINISTRATION ARTICLE 12 — GENERAL OBLIGATION TO INFORM 12.1 General obligation to provide information upon request The beneficiaries must provide — during implementation of the action or afterwards and in accordance with article 25.2 — any information requested in order to verify eligibility of the costs, proper implementation of the action and compliance with the other obligations under the Agreement. 18 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 12.2 Obligation to keep information up to date and to inform about events and circumstances likely to affect the Agreement Each beneficiary must keep information stored in the Participant Portal Beneficiary Register (via the electronic exchange system; see Article 36) up to date, in particular, its name, address, legal representatives, legal form and organisation type. Each beneficiary must immediately inform the coordinator — which must immediately inform the Commission and the other beneficiaries — of any of the following: (a) events which are likely to affect significantly or delay the implementation of the action or the EU’s financial interests, in particular: (i) changes in its legal, financial, technical, organisational or ownership situation (b) circumstances affecting: (i) the decision to award the grant or (ii) compliance with requirements under the Agreement. 12.3 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 27). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 13 — KEEPING RECORDS — SUPPORTING DOCUMENTATION 13.1 Obligation to keep records and other supporting documentation The beneficiaries must — for a period of five years after the payment of the balance — keep records and other supporting documentation in order to prove the proper implementation of the action and the costs they declare as eligible. They must make them available upon request (see Article 12) or in the context of checks, reviews, audits or investigations (see Article 17). If there are on-going checks, reviews, audits, investigations, litigation or other pursuits of claims under the Agreement (including the extension of findings; see Articles 17), the beneficiaries must keep the records and other supporting documentation until the end of these procedures. The beneficiaries must keep the original documents. Digital and digitalised documents are considered originals if they are authorised by the applicable national law. The Commission may accept non- original documents if they considers that they offer a comparable level of assurance. 13.1.1 Records and other supporting documentation on the technical implementation The beneficiaries must keep records and other supporting documentation on the technical implementation of the action, in line with the accepted standards in the respective field. 19 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 13.1.2 Records and other documentation to support the costs declared The beneficiaries must keep the records and documentation supporting the costs declared, in particular the following: (a) for actual costs: adequate records and other supporting documentation to prove the costs declared, such as contracts, subcontracts, invoices and accounting records. In addition, the beneficiaries' usual cost accounting practices and internal control procedures must enable direct reconciliation between the amounts declared, the amounts recorded in their accounts and the amounts stated in the supporting documentation; (b) for unit costs: not applicable; (c) for flat-rate costs: adequate records and other supporting documentation to prove the eligibility of the costs to which the flat-rate is applied. The beneficiaries do not need to identify the costs covered or provide supporting documentation (such as accounting statements) to prove the amount declared at a flat-rate. (d) for lump sum costs: not applicable. In addition, for personnel costs (declared as actual costs), the beneficiaries must keep time records for the number of hours declared. The time records must be in writing and approved by the persons working on the action and their supervisors, at least monthly. In the absence of reliable time records of the hours worked on the action, the Commission may accept alternative evidence supporting the number of hours declared, if it considers that it offers an adequate level of assurance. As an exception, for persons working exclusively on the action, there is no need to keep time records, if the beneficiary signs a declaration confirming that the persons concerned have worked exclusively on the action. 13.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, costs insufficiently substantiated will be ineligible (see Article 6) and will be rejected (see Article 26), and the grant may be reduced (see Article 27). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 14 — SUBMISSION OF DELIVERABLES 14.1 Obligation to submit deliverables The coordinator must submit: - a mid-term progress report on the implementation of the action, within 30 days after half of the reporting period set out in Article 15.2 has passed; - the ‘deliverables’ identified in Annex 1, in accordance with the timing and conditions set out in it. 20 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 14.2 Consequences of non-compliance If the coordinator breaches any of its obligations under this Article, the Commission may apply any of the measures described in Chapter 6. ARTICLE 15 — REPORTING — PAYMENT REQUESTS 15.1 Obligation to submit reports The coordinator must submit to the Commission (see Article 36) the technical and financial report(s) set out in this Article. This report includes the request(s) for payment and must be drawn up using the forms and templates provided in the electronic exchange system (see Article 36). 15.2 Reporting periods The action has one ‘reporting period’: - RP1: from month 1 to month 24 15.2a Request(s) for further pre-financing payment(s) Not applicable 15.3 Periodic reports — Requests for interim payments Not applicable 15.4 Final report — Request for payment of the balance The coordinator must submit — within 60 days following the end of the reporting period — a final report, which includes the request for payment of the balance. The final report must include the following: (a) a ‘final technical report’ containing: (i) an explanation of the work carried out by the beneficiaries; (ii) an overview of the implementation of the action, including milestones and deliverables identified in Annex 1. This report must include explanations justifying the differences between work expected to be carried out in accordance with Annex 1 and that actually carried out; (iii) a summary for publication by the Commission; (iv) the answers to the ‘questionnaire’: not applicable; (b) a ‘final financial report’ containing: 21 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 (i) an ‘individual financial statement’ (see Annex 4) from each beneficiary, for the reporting period. The individual financial statement must detail the eligible costs (actual costs and flat-rate costs; see Article 6) for each budget category (see Annex 2). The beneficiaries must declare all eligible costs, even if — for actual costs and flat- rate costs — they exceed the amounts indicated in the estimated budget (see Annex 2). Amounts which are not declared in the individual financial statement will not be taken into account by the Commission. The individual financial statements must also detail the receipts of the action (see Article 5.3.3). Each beneficiary must certify that: - the information provided is full, reliable and true; - the costs declared are eligible (see Article 6); - the costs can be substantiated by adequate records and supporting documentation (see Article 13) that will be produced upon request (see Article 12) or in the context of checks, reviews, audits and investigations (see Article 17), and - that all the receipts have been declared (see Article 5.3.3); (ii) an explanation of the use of resources and the information on subcontracting (see Article 10) from each beneficiary, for the reporting period concerned; (iii) not applicable; (iv) a ‘final summary financial statement’, created automatically by the electronic exchange system, consolidating the individual financial statement(s) for the reporting period and including the request for payment of the balance; (v) a ‘certificate on the financial statements’ (drawn up in accordance with Annex 5) for each beneficiary, if: - it requests an EU contribution of EUR 325 000 or more as reimbursement of actual costs and - the maximum EU contribution indicated, for that beneficiary, in the estimated budget (see Annex 2) as reimbursement of actual costs is EUR 750 000 or more. 15.5 Information on cumulative expenditure incurred Not applicable 15.6 Currency for financial statements and conversion into euro 22 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 Financial statements must be drafted in euro. Beneficiaries with accounting established in a currency other than the euro must convert the costs recorded in their accounts into euro, at the average of the daily exchange rates published in the C series of the Official Journal of the European Union, calculated over the corresponding reporting period. If no daily euro exchange rate is published in the Official Journal of the European Union for the currency in question, they must be converted at the average of the monthly accounting rates published on the Commission’s website, calculated over the corresponding reporting period. Beneficiaries with accounting established in euro must convert costs incurred in another currency into euro according to their usual accounting practices. 15.7 Language of reports All report(s) (including financial statements) must be submitted in the language of the Agreement. 15.8 Consequences of non-compliance If the report(s) submitted do not comply with this Article, the Commission may suspend the payment deadline (see Article 31) and apply any of the other measures described in Chapter 6. If the coordinator breaches its obligation to submit the report(s) and if it fails to comply with this obligation within 30 days following a written reminder, the Commission may terminate the Agreement (see Article 34) or apply any of the other measures described in Chapter 6. ARTICLE 16 — PAYMENTS AND PAYMENT ARRANGEMENTS 16.1 Payments to be made The following payments will be made to the coordinator: - a pre-financing payment; - one payment of the balance, on the basis of the request for payment of the balance (see Article 15). 16.2 Pre-financing payment(s) — Amount The aim of the pre-financing is to provide the beneficiaries with a float. It remains the property of the EU until the payment of the balance. The amount of the pre-financing payment will be EUR 234,211.68 (two hundred and thirty four thousand two hundred and eleven EURO and sixty eight eurocents). The Commission will — except if Article 32 applies — make the pre-financing payment to the coordinator within 30 days from the accession of all beneficiaries to the Agreement (see Article 40). 16.3 Interim payments — Amount — Calculation 23 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 Not applicable 16.4 Payment of the balance — Amount — Calculation The payment of the balance reimburses the remaining part of the eligible costs incurred by the beneficiaries for the implementation of the action. If the total amount of earlier payments is greater than the final grant amount (see Article 5.3), the payment of the balance takes the form of a recovery (see Article 28). If the total amount of earlier payments is lower than the final grant amount, the Commission will pay the balance within 90 days from receiving the final report (see Article 15.4), except if Articles 31 or 32 apply. Payment is subject to the approval of the final report. Its approval does not imply recognition of compliance, authenticity, completeness or correctness of its content. The amount due as the balance is calculated by the Commission by deducting the total amount of pre-financing and interim payments (if any) already made, from the final grant amount determined in accordance with Article 5.3: {final grant amount (see Article 5.3) minus {pre-financing and interim payments (if any) made}}. If the balance is positive, it will be paid to the coordinator. The amount to be paid may however be offset — without the beneficiaries’ consent — against any other amount owed by a beneficiary to the Commission or an executive agency (under the EU or Euratom budget), up to the maximum EU contribution indicated, for that beneficiary, in the estimated budget (see Annex 2). If the balance is negative, it will be recovered from the coordinator (see Article 28). 16.5 Notification of amounts due When making payments, the Commission will formally notify to the coordinator the amount due, specifying that it concerns the payment of the balance. For the payment of the balance, the notification will also specify the final grant amount. In the case of reduction of the grant or recovery of undue amounts, the notification will be preceded by the contradictory procedure set out in Articles 27 and 28. 16.6 Currency for payments The Commission will make all payments in euro. 16.7 Payments to the coordinator — Distribution to the beneficiaries 24 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 Payments will be made to the coordinator. Payments to the coordinator will discharge the Commission from its payment obligation. The coordinator must distribute the payments between the beneficiaries without unjustified delay. 16.8 Bank account for payments All payments will be made to the following bank account: Name of bank: AS SEB PANK Full name of the account holder: RAHANDUSMINISTEERIUM Full account number (including bank codes): IBAN code: EE221010220027690221 16.9 Costs of payment transfers The cost of the payment transfers is borne as follows: - the Commission bears the cost of transfers charged by its bank; - the beneficiary bears the cost of transfers charged by its bank; - the party causing a repetition of a transfer bears all costs of the repeated transfer. 16.10 Date of payment Payments by the Commission are considered to have been carried out on the date when they are debited to its account. 16.11 Consequences of non-compliance 16.11.1 If the Commission does not pay within the payment deadlines (see above), the beneficiaries are entitled to late-payment interest at the rate applied by the European Central Bank (ECB) for its main refinancing operations in euros (‘reference rate’), plus three and a half points. The reference rate is the rate in force on the first day of the month in which the payment deadline expires, as published in the C series of the Official Journal of the European Union. If the late-payment interest is lower than or equal to EUR 200, it will be paid to the coordinator only upon request submitted within two months of receiving the late payment. Late-payment interest is not due if all beneficiaries are EU Member States (including regional and local government authorities or other public bodies acting on behalf of a Member State for the purpose of this Agreement). Suspension of the payment deadline or payments (see Articles 31 and 32) will not be considered as late payment. Late-payment interest covers the period running from the day following the due date for payment (see above), up to and including the date of payment. 25 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 Late-payment interest is not considered for the purposes of calculating the final grant amount. 16.11.2 If the coordinator breaches any of its obligations under this Article, the grant may be reduced (see Article 27) and the Agreement or the participation of the coordinator may be terminated (see Article 34). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 17 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF FINDINGS 17.1 Checks, reviews and audits by the Commission 17.1.1 Right to carry out checks The Commission will — during the implementation of the action or afterwards — check the proper implementation of the action and compliance with the obligations under the Agreement, including assessing deliverables and reports. For this purpose, the Commission may be assisted by external persons or bodies. The Commission may also request additional information in accordance with Article 12. The Commission may request the beneficiaries to provide such information to it directly. Information provided must be accurate, precise and complete and in the format requested, including electronic format. 17.1.2 Right to carry out reviews The Commission may — during the implementation of the action or afterwards — carry out reviews on the proper implementation of the action (including assessment of deliverables and reports) and compliance with the obligations under the Agreement. Reviews may be started up to five years after the payment of the balance. They will be formally notified to the coordinator or beneficiary concerned and will be considered to have started on the date of the formal notification. If the review is carried out on a third party (see Articles 9 to 11a), the beneficiary concerned must inform the third party. The Commission may carry out reviews directly (using its own staff) or indirectly (using external persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned of the identity of the external persons or bodies. They have the right to object to the appointment on grounds of commercial confidentiality. The coordinator or beneficiary concerned must provide — within the deadline requested — any information and data in addition to deliverables and reports already submitted (including information on the use of resources). The Commission may request beneficiaries to provide such information to it directly. 26 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 The coordinator or beneficiary concerned may be requested to participate in meetings, including with external experts. For on-the-spot reviews, the beneficiaries must allow access to their sites and premises, including to external persons or bodies, and must ensure that information requested is readily available. Information provided must be accurate, precise and complete and in the format requested, including electronic format. On the basis of the review findings, a ‘review report’ will be drawn up. The Commission will formally notify the review report to the coordinator or beneficiary concerned, which has 30 days to formally notify observations (‘contradictory review procedure’). Reviews (including review reports) are in the language of the Agreement. 17.1.3 Right to carry out audits The Commission may — during the implementation of the action or afterwards — carry out audits on the proper implementation of the action and compliance with the obligations under the Agreement. Audits may be started up to five years after the payment of the balance. They will be formally notified to the coordinator or beneficiary concerned and will be considered to have started on the date of the formal notification. If the audit is carried out on a third party (see Articles 9 to 11a), the beneficiary concerned must inform the third party. The Commission may carry out audits directly (using its own staff) or indirectly (using external persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned of the identity of the external persons or bodies. They have the right to object to the appointment on grounds of commercial confidentiality. The coordinator or beneficiary concerned must provide — within the deadline requested — any information (including complete accounts, individual salary statements or other personal data) to verify compliance with the Agreement. The Commission may request beneficiaries to provide such information to it directly. For on-the-spot audits, the beneficiaries must allow access to their sites and premises, including to external persons or bodies, and must ensure that information requested is readily available. Information provided must be accurate, precise and complete and in the format requested, including electronic format. On the basis of the audit findings, a ‘draft audit report’ will be drawn up. The Commission will formally notify the draft audit report to the coordinator or beneficiary concerned, which has 30 days to formally notify observations (‘contradictory audit procedure’). This period may be extended by the Commission in justified cases. 27 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 The ‘final audit report’ will take into account observations by the coordinator or beneficiary concerned. The report will be formally notified to it. Audits (including audit reports) are in the language of the Agreement. The Commission may also access the beneficiaries’ statutory records for the periodical assessment of flat-rate amounts. 17.2 Investigations by the European Anti-Fraud Office (OLAF) Under Regulations No 883/20137and No 2185/968 (and in accordance with their provisions and procedures), the European Anti-Fraud Office (OLAF) may — at any moment during implementation of the action or afterwards — carry out investigations, including on-the-spot checks and inspections, to establish whether there has been fraud, corruption or any other illegal activity affecting the financial interests of the EU. 17.3 Checks and audits by the European Court of Auditors (ECA) Under Article 287 of the Treaty on the Functioning of the European Union (TFEU) and Article 161 of the Financial Regulation No 966/20129, the European Court of Auditors (ECA) may — at any moment during implementation of the action or afterwards — carry out audits. The ECA has the right of access for the purpose of checks and audits. 17.4 Checks, reviews, audits and investigations for international organisations Not applicable 17.5 Consequences of findings in checks, reviews, audits and investigations — Extension of findings 17.5.1 Findings in this grant Findings in checks, reviews, audits or investigations carried out in the context of this grant may lead to the rejection of ineligible costs (see Article 26), reduction of the grant (see Article 27), recovery of undue amounts (see Article 28) or to any of the other measures described in Chapter 6. Rejection of costs or reduction of the grant after the payment of the balance will lead to a revised final grant amount (see Article 5.4). 7 Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013 concerning investigations conducted by the European Anti-Fraud Office (OLAF) and repealing Regulation (EC) No 1073/1999 of the European Parliament and of the Council and Council Regulation (Euratom) No 1074/1999 (OJ L 248, 18.09.2013, p. 1). 8 Council Regulation (Euratom, EC) No 2185/1996 of 11 November 1996 concerning on-the-spot checks and inspections carried out by the Commission in order to protect the European Communities' financial interests against fraud and other irregularities (OJ L 292, 15.11.1996, p. 2). 9 Regulation (EU, EURATOM) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing Council Regulation (EC, EURATOM)) No 1605/2002 (OJ L 298, 26.10.2012, p. 1). 28 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 Findings in checks, reviews, audits or investigations may lead to a request for amendment for the modification of Annex 1 (see Article 39). Checks, reviews, audits or investigations that find systemic or recurrent errors, irregularities, fraud or breach of obligations may also lead to consequences in other EU or Euratom grants awarded under similar conditions (‘extension of findings from this grant to other grants’). Moreover, findings arising from an OLAF investigation may lead to criminal prosecution under national law. 17.5.2 Findings in other grants The Commission may extend findings from other grants to this grant (‘extension of findings from other grants to this grant’), if: (a) the beneficiary concerned is found, in other EU or Euratom grants awarded under similar conditions, to have committed systemic or recurrent errors, irregularities, fraud or breach of obligations that have a material impact on this grant and (b) those findings are formally notified to the beneficiary concerned — together with the list of grants affected by the findings — no later than five years after the payment of the balance of this grant. The extension of findings may lead to the rejection of costs (see Article 26), reduction of the grant (see Article 27), recovery of undue amounts (see Article 28), suspension of payments (see Article 32), suspension of the action implementation (see Article 33) or termination (see Article 34). 17.5.3 Procedure The Commission will formally notify the beneficiary concerned the systemic or recurrent errors and its intention to extend these audit findings, together with the list of grants affected. 17.5.3.1 If the findings concern eligibility of costs: the formal notification will include: (a) an invitation to submit observations on the list of grants affected by the findings; (b) the request to submit revised financial statements for all grants affected; (c) the correction rate for extrapolation established by the Commission on the basis of the systemic or recurrent errors, to calculate the amounts to be rejected, if the beneficiary concerned: (i) considers that the submission of revised financial statements is not possible or practicable or (ii) does not submit revised financial statements. The beneficiary concerned has 90 days from receiving notification to submit observations, revised financial statements or to propose a duly substantiated alternative correction method. This period may be extended by the Commission in justified cases. 29 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 The Commission may then start a rejection procedure in accordance with Article 26, either on the basis of the revised financial statements, the alternative method or the correction rate announced. 17.5.3.2 If the findings concern substantial errors, irregularities or fraud orserious breach of obligations: the formal notification will include: (a) an invitation to submit observations on the list of grants affected by the findings and (b) the flat-rate the Commission intends to apply according to the principle of proportionality. The beneficiary concerned has 90 days from receiving notification to submit observations or to propose a duly substantiated alternative flat-rate. The Commission may then start a reduction procedure in accordance with Article 27, either on the basis of the alternative flat-rate or the flat-rate announced. 17.6 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, any insufficiently substantiated costs will be ineligible (see Article 6) and will be rejected (see Article 26). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 18 — EVALUATION OF THE IMPACT OF THE ACTION 18.1 Right to evaluate the impact of the action The Commission may carry out interim and final evaluations of the impact of the action measured against the objective of the EU programme. Evaluations may be started during implementation of the action and up to five years after the payment of the balance. The evaluation is considered to start on the date of the formal notification to the coordinator or beneficiaries. The Commission may make these evaluations directly (using its own staff) or indirectly (using external bodies or persons it has authorised to do so). The coordinator or beneficiaries must provide any information relevant to evaluate the impact of the action, including information in electronic format. 18.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the Commission may apply the measures described in Chapter 6. SECTION 3 OTHER RIGHTS AND OBLIGATIONS 30 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 ARTICLE 19 — PRE-EXISTING RIGHTS AND OWNERSHIP OF THE RESULTS (INCLUDING INTELLECTUAL AND INDUSTRIAL PROPERTY RIGHTS) 19.1 Pre-existing rights and access rights to pre-existing rights Where industrial and intellectual property rights (including rights of third parties) exist prior to the Agreement, the beneficiaries must establish a list of these pre-existing industrial and intellectual property rights, specifying the owner and any persons that have a right of use. The coordinator must — before starting the action — submit this list to the Commission. Each beneficiary must give the other beneficiaries access to any pre-existing industrial and intellectual property rights needed for the implementation of the action and compliance with the obligations under the Agreement. 19.2 Ownership of results and rights of use The results of the action (including the reports and other documents relating to it) are owned by the beneficiaries. The beneficiaries must give the Commission the right to use the results for their communication activities under Article 22. 19.3 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 27). Such a breach may also lead to any of the other measures described in Chapter 6. ARTICLE 20 — CONFLICT OF INTERESTS 20.1 Obligation to avoid a conflict of interests The beneficiaries must take all measures to prevent any situation where the impartial and objective implementation of the action is compromised for reasons involving economic interest, political or national affinity, family or emotional ties or any other shared interest (‘conflict of interests’). They must formally notify to the Commission without delay any situation constituting or likely to lead to a conflict of interests and immediately take all the necessary steps to rectify this situation. The Commission may verify that the measures taken are appropriate and may require additional measures to be taken by a specified deadline. 20.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 27) and the Agreement may be terminated (see Article 34). 31 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 21 — CONFIDENTIALITY 21.1 General obligation to maintain confidentiality During implementation of the action and for five years after the payment of the balance, the parties must keep confidential any data, documents or other material (in any form) that is identified as confidential at the time it is disclosed (‘confidential information’). They may use confidential information to implement the Agreement. The confidentiality obligations no longer apply if: (a) the disclosing party agrees to release the other party; (b) the information becomes generally and publicly available, without breaching any confidentiality obligation; (c) the disclosure of the confidential information is required by EU or national law. 21.2 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 27). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 22 — PROMOTING THE ACTION — VISIBILITY OF EU FUNDING 22.1 Communication activities by the beneficiaries 22.1.1 General obligation to promote the action and its results The beneficiaries must promote the action and its results. 22.1.2 Information on EU funding — Obligation and right to use the EU emblem Unless the Commission requests or agrees otherwise, any communication activity related to the action (including at conferences, seminars, in information material, such as brochures, leaflets, posters, presentations, etc., in electronic form, via social media, etc.) and any infrastructure, equipment or major result funded by the grant must: - display the EU emblem and - include the following text: “This [insert appropriate description, e.g. report, publication, conference, infrastructure, equipment, insert type of result, etc.] was funded by the European Union’s Rights, Equality and Citizenship Programme (2014-2020).” When displayed in association with another logo, the EU emblem must have appropriate prominence. 32 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 For the purposes of their obligations under this Article, the beneficiaries may use the EU emblem without first obtaining approval from the Commission. This does not, however, give them the right to exclusive use. Moreover, they may not appropriate the EU emblem or any similar trademark or logo, either by registration or by any other means. 22.1.3 Disclaimer excluding Commission responsibility Any communication activity related to the action must indicate the following disclaimer: “The content of this [insert appropriate description, e.g. report, publication, conference, etc.] represents the views of the author only and is his/her sole responsibility. The European Commission does not accept any responsibility for use that may be made of the information it contains.” 22.2 Communication activities by the Commission 22.2.1 Right to use beneficiaries’ materials, documents or information The Commission may use information relating to the action, documents notably summaries for publication and public deliverables as well as any other material, such as pictures or audio-visual material received from any beneficiary (including in electronic form). This does not change the confidentiality obligations in Article 21, which still apply. The right to use a beneficiary’s materials, documents and information includes: (a) use for its own purposes (in particular, making them available to persons working for the Commission or any other EU institution, body, office or agency or body or institutions in EU Member States; and copying or reproducing them in whole or in part, in unlimited numbers); (b) distribution to the public (in particular, publication as hard copies and in electronic or digital format, publication on the internet, as a downloadable or non-downloadable file, broadcasting by any channel, public display or presentation, communicating through press information services, or inclusion in widely accessible databases or indexes); (c) editing or redrafting for communication and publicising activities (including shortening, summarising, inserting other elements (such as meta-data, legends, other graphic, visual, audio or text elements), extracting parts (e.g. audio or video files), dividing into parts, use in a compilation); (d) translation; (e) giving access in response to individual requests under Regulation No 1049/200110, without the right to reproduce or exploit; (f) storage in paper, electronic or other form; 10 Regulation (EC) No 1049/2001 of the European Parliament and of the Council of 30 May 2001 regarding public access to European Parliament, Council and Commission documents, OJ L 145, 31.5.2001, p. 43. 33 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 (g) archiving, in line with applicable document-management rules, and (h) the right to authorise third parties to act on its behalf or sub-license the modes of use set out in Points (b), (c), (d) and (f) to third parties if needed for the communication and publicising activities of the Commission. If the right of use is subject to rights of a third party (including personnel of the beneficiary), the beneficiary must ensure that it complies with its obligations under this Agreement (in particular, by obtaining the necessary approval from the third parties concerned). Where applicable (and if provided by the beneficiaries), the Commission will insert the following information: “© – [year] – [name of the copyright owner]. All rights reserved. Licensed to the European Union (EU) under conditions.” 22.3 Consequences of non-compliance If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see Article 27). Such breaches may also lead to any of the other measures described in Chapter 6. ARTICLE 23 — PROCESSING OF PERSONAL DATA 23.1 Processing of personal data by the Commission Any personal data under the Agreement will be processed by the Commission under Regulation No 45/200111 and according to the ‘notifications of the processing operations’ to the Data Protection Officer (DPO) of the Commission (publicly accessible in the DPO register). Such data will be processed by the ‘data controller’ of the Commission for the purposes of implementing, managing and monitoring the Agreement or protecting the financial interests of the EU or Euratom (including checks, reviews, audits and investigations; see Article 17). The persons whose personal data are processed have the right to access and correct their own personal data. For this purpose, they must send any queries about the processing of their personal data to the data controller, via the contact point indicated in the privacy statement(s) on the Commission websites. They also have the right to have recourse at any time to the European Data Protection Supervisor (EDPS). 23.2 Processing of personal data by the beneficiaries The beneficiaries must process personal data under the Agreement in compliance with applicable EU and national law on data protection (including authorisations or notification requirements). 11 Regulation (EC) No 45/2001 of the European Parliament and of the Council of 18 December 2000 on the protection of individuals with regard to the processing of personal data by the Community institutions and bodies and on the free movement of such data (OJ L 8, 12.01.2001, p. 1). 34 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 The beneficiaries may grant their personnel access only to data that is strictly necessary for implementing, managing and monitoring the Agreement. The beneficiaries must inform the personnel whose personal data are collected and processed by the Commission. For this purpose, they must provide them with the privacy statement(s) (see above), before transmitting their data to the Commission. 23.3 Consequences of non-compliance If a beneficiary breaches any of its obligations under Article 23.2, the Commission may apply any of the measures described in Chapter 6. ARTICLE 24 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE COMMISSION The beneficiaries may not assign any of their claims for payment against the Commission to any third party, except if approved by the Commission on the basis of a reasoned, written request by the coordinator (on behalf of the beneficiary concerned). If the Commission has not accepted the assignment or the terms of it are not observed, the assignment will have no effect on it. In no circumstances will an assignment release the beneficiaries from their obligations towards the Commission. CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES ARTICLE 25 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES 25.1 Roles and responsibilities towards the Commission The beneficiaries have full responsibility for implementing the action and complying with the Agreement. The beneficiaries are jointly and severally liable for the technical implementation of the action as described in Annex 1. If a beneficiary fails to implement its part of the action, the other beneficiaries become responsible for implementing this part (without being entitled to any additional EU funding for doing so), unless the Commission expressly relieves them of this obligation. The financial responsibility of each beneficiary is governed by Articles 28, 29 and 30. 25.2 Internal division of roles and responsibilities The internal roles and responsibilities of the beneficiaries are divided as follows: (a) Each beneficiary must: (i) keep information stored in the Participant Portal Beneficiary Register (via the electronic exchange system) up to date (see Article 12); 35 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 (ii) inform the coordinator immediately of any events or circumstances likely to affect significantly or delay the implementation of the action (see Article 12); (iii) submit to the coordinator in good time: - individual financial statement(s) for itself and, if required, certificates on the financial statement(s) (see Article 15); - the data needed to draw up the technical report(s) (see Article 15); - any other documents or information required by the Commission under the Agreement, unless the Agreement requires the beneficiary to submit this information directly. (b) The coordinator must: (i) monitor that the action is implemented properly (see Article 7); (ii) act as the intermediary for all communications between the beneficiaries and the Commission (in particular, providing the Commission with the information described in Article 12), unless the Agreement specifies otherwise; (iii) provide a pre-financing guarantee if requested by the Commission (see Article 16.2); (iv) request and review any documents or information required by the Commission and verify their completeness and correctness before passing them on to the Commission; (v) submit the deliverables and report(s) to the Commission (see Articles 14 and 15); (vi) ensure that all payments are made to the other beneficiaries without unjustified delay (see Article 16); The coordinator may not subcontract the above-mentioned tasks. 25.3 Internal arrangements between beneficiaries — Consortium agreement The beneficiaries must have internal arrangements regarding their operation and co-ordination to ensure that the action is implemented properly. These internal arrangements must be set out in a written ‘consortium agreement’ between the beneficiaries, which may cover: - internal organisation of the consortium; - management of access to the electronic exchange system; - distribution of EU funding; - additional rules on rights and obligations related to pre-existing rights and results (see Article 19); - settlement of internal disputes; 36 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 - liability, indemnification and confidentiality arrangements between the beneficiaries. The consortium agreement must not contain any provision contrary to the Agreement. CHAPTER 6 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY — PENALTIES — DAMAGES — SUSPENSION — TERMINATION — FORCE MAJEURE SECTION 1 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY — PENALTIES ARTICLE 26 — REJECTION OF INELIGIBLE COSTS 26.1 Conditions The Commission will — at the payment of the balance or afterwards — reject any costs which are ineligible (see Article 6), in particular following checks, reviews, audits or investigations (see Article 17). The rejection may also be based on the extension of findings from other grants to this grant (see Article 17.5.2). 26.2 Ineligible costs to be rejected — Calculation — Procedure Ineligible costs will be rejected in full. If the rejection of costs does not lead to a recovery (see Article 28), the Commission will formally notify the coordinator or beneficiary concerned of the rejection of costs, the amounts and the reasons why (if applicable, together with the notification of amounts due; see Article 16.5). The coordinator or beneficiary concerned may — within 30 days of receiving notification — formally notify the Commission of its disagreement and the reasons why. If the rejection of costs leads to a recovery, the Commission will follow the contradictory procedure with pre-information letter set out in Article 28. 26.3 Effects If the Commission rejects costs at the payment of the balance, it will deduct them from the total eligible costs declared, for the action, in the final summary financial statement (see Article 15.3 and 15.4). It will then calculate payment of the balance as set out in Article 16.3 or 16.4. If the Commission rejects costs after the payment of the balance, it will deduct the amount rejected from the total eligible costs declared, by the beneficiary, in the final summary financial statement. It will then calculate the revised final grant amount as set out in Article 5.4. If the revised final grant amount is lower than the final grant amount, the Commission will recover the difference (see Article 28). ARTICLE 27 — REDUCTION OF THE GRANT 37 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 27.1 Conditions The Commission may — at the payment of the balance or afterwards — reduce the grant, if: (a) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed: (i) substantial errors, irregularities or fraud or (ii) serious breach of obligations under the Agreement or during the award procedure (including improper implementation of the action, submission of false information, failure to provide required information, breach of ethical principles) or (b) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (extension of findings from other grants to this grant; see Article 17.5.2). 27.2 Amount to be reduced — Calculation — Procedure The amount of the reduction will be proportionate to the seriousness of the errors, irregularities or fraud or breach of obligations. Before reduction of the grant, the Commission will formally notify a ‘pre-information letter’ to the coordinator or beneficiary concerned: - informing it of its intention to reduce the grant, the amount it intends to reduce and the reasons why and - inviting it to submit observations within 30 days of receiving notification If the Commission does not receive any observations or decides to pursue reduction despite the observations it has received, it will formally notify confirmation of the reduction (if applicable, together with the notification of amounts due; see Article 16). 27.3 Effects If the Commission reduces the grant at the time of the payment of the balance, it will calculate the reduced grant amount for the action and then determine the amount due as payment of the balance (see Articles 5.3.4 and 16.4). If the Commission reduces the grant after the payment of the balance, it will calculate the revised final grant amount for the action or for the beneficiary concerned (see Article 5.4). If the revised final grant amount is lower than the final grant amount, the Commission will recover the difference (see Article 28). ARTICLE 28 — RECOVERY OF UNDUE AMOUNTS 28.1 Amount to be recovered — Calculation — Procedure 38 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 The Commission will — at the payment of the balance or afterwards — claim back amount that was paid but is not due under the Agreement. The coordinator is fully liable for repaying debts of the consortium (under the Agreement), even if it has not been the final recipient of those amounts. In addition, the beneficiaries (including the coordinator) are jointly and severally liable for repaying any debts under the Agreement (including late-payment interest) — up to the maximum EU contribution indicated, for each beneficiary, in the estimated budget (as last amended; see Annex 2). 28.1.1 Recovery at payment of the balance If the payment of the balance takes the form of a recovery (see Article 16.4), the Commission will formally notify a ‘pre-information letter’ to the coordinator: - informing it of its intention to recover, the amount due as the balance and the reasons why and - inviting the coordinator to submit observations within 30 days of receiving notification. If no observations are submitted or the Commission decides to pursue recovery despite the observations it has received, it will confirm the amount to be recovered and formally notify to the coordinator a debit note with the terms and the date for payment (together with the notification of amounts due; see Article 16.5). If payment is not made by the date specified in the debit note, the Commission will recover the amount: (a) by ‘offsetting’ it — without the coordinator’s consent — against any amounts owed to the coordinator by the Commission or an executive agency (from the EU or Euratom budget). In exceptional circumstances, to safeguard the EU’s financial interests, the Commission may offset before the payment date specified in the debit note; (b) not applicable; (c) by holding the other beneficiaries jointly and severally liable — up to the maximum EU contribution indicated, for each beneficiary, in the estimated budget (as last amended; see Annex 2) (d) by taking legal action (see Article 41) or by adopting an enforceable decision under Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the Financial Regulation No 966/2012. If payment is not made by the date in the debit note, the amount to be recovered (see above) will be increased by late-payment interest at the rate set out in Article 16.11, from the day following the payment date in the debit note, up to and including the date the Commission receives full payment of the amount. Partial payments will be first credited against expenses, charges and late-payment interest and then against the principal. 39 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 Bank charges incurred in the recovery process will be borne by the beneficiary, unless Directive 2007/64/EC applies. 28.1.2 Recovery of amounts after payment of the balance If — after the payment of the balance — the Commission revised the final grant amount for the action or for the beneficiary concerned (see Article 5.4), due to a rejection of costs or reduction of the grant, and the revised final grant amount is lower than the final grant amount (see Article 5.3), the Commission will: - if the rejection or reduction does not concern a specific beneficiary: claim back the difference from the coordinator (even if it has not been the final recipient of the amount in question) or - otherwise: claim back the difference from the beneficiary concerned. The Commission will formally notify a pre-information letter to the coordinator or beneficiary concerned: - informing it of its intention to recover, the amount to be repaid and the reasons why and - inviting it to submit observations within 30 days of receiving notification. If no observations are submitted or the Commission decides to pursue recovery despite the observations it has received, it will confirm the amount to be recovered and formally notify to the coordinator or beneficiary concerned a debit note. This note will also specify the terms and the date for payment. If payment is not made by the date specified in the debit note, the Commission will recover the amount: (a) by ‘offsetting’ it — without the coordinator's or beneficiary’s consent — against any amounts owed to the coordinator or beneficiary concerned by the Commission or an executive agency (from the EU or Euratom budget). In exceptional circumstances, to safeguard the EU’s financial interests, the Commission may offset before the payment date specified in the debit note; (b) by holding the other beneficiaries jointly and severally liable, up to the maximum EU contribution indicated, for each beneficiary, in the estimated budget (as last amended; see Annex 2); (c) by taking legal action (see Article 41) or by adopting an enforceable decision under Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the Financial Regulation No 966/2012. If payment is not made by the date in the debit note, the amount to be recovered (see above) will be increased by late-payment interest at the rate set out in Article 16.11, from the day following the date for payment in the debit note, up to and including the date the Commission receives full payment of the amount. 40 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 Partial payments will be first credited against expenses, charges and late-payment interest and then against the principal. Bank charges incurred in the recovery process will be borne by the beneficiary, unless Directive 2007/64/EC applies. ARTICLE 29 — ADMINISTRATIVE SANCTIONS In addition to contractual measures, the Commission may also adopt administrative sanctions under Articles 106 and 131(4) of the Financial Regulation No 966/2012 (i.e. exclusion from future procurement contracts, grants and expert contracts and/or financial penalties). SECTION 2 LIABILITY FOR DAMAGES ARTICLE 30 — LIABILITY FOR DAMAGES 30.1 Liability of the Commission The Commission cannot be held liable for any damage caused to the beneficiaries or to third parties as a consequence of implementing the Agreement, including for gross negligence. The Commission cannot be held liable for any damage caused by any of the beneficiaries or third parties involved in the action, as a consequence on implementing the Agreement. 30.2 Liability of the beneficiaries Except in case of force majeure (see Article 35), the beneficiaries must compensate the Commission for any damage it sustains as a result of the implementation of the action or because the action was not implemented in full compliance with the Agreement. SECTION 3 SUSPENSION AND TERMINATION ARTICLE 31 — SUSPENSION OF PAYMENT DEADLINE 31.1 Conditions The Commission may — at any moment — suspend the payment deadline (see Article 16.2 to 16.4) if a request for payment (see Article 15) cannot be approved because: (a) it does not comply with the provisions of the Agreement (see Article 15); (b) the technical or financial report(s) have not been submitted or are not complete or additional information is needed, or (c) there is doubt about the eligibility of the costs declared in the financial statements and additional checks, reviews, audits or investigations are necessary. 31.2 Procedure 41 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 The Commission will formally notify the coordinator of the suspension and the reasons why. The suspension will take effect the day notification is sent by the Commission (see Article 36). If the conditions for suspending the payment deadline are no longer met, the suspension will be lifted — and the remaining period will resume. If the suspension exceeds two months, the coordinator may request the Commission if the suspension will continue. If the payment deadline has been suspended due to the non-compliance of the technical or financial report(s) (see Article 15) and the revised report or statement is not submitted or was submitted but is also rejected, the Commission may also terminate the Agreement or the participation of the beneficiary (see Article 34.3.1(i)). ARTICLE 32 — SUSPENSION OF PAYMENTS 32.1 Conditions The Commission may — at any moment — suspend payments, in whole or in part for one or more beneficiaries, if: (a) a beneficiary (or a natural person who has the power to represent or take decision on its behalf) has committed or is suspected of having committed: (i) substantial errors, irregularities or fraud or (ii) serious breach of obligations under this Agreement or during the award procedure (including improper implementation of the action, submission of false information, failure to provide required information, breach of ethical principles), or (b) a beneficiary (or a natural person who has the power to represent or take decision on its behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (extension of findings from other grants to this grant; see Article 17.5.2). If payments are suspended for one or more beneficiaries, the Commission will make partial payment(s) for the part(s) not suspended. If suspension concerns the payment of the balance, the payment (or recovery) of the amount(s) concerned after suspension is lifted will be considered to be the payment that closes the action. 32.2 Procedure Before suspending payments, the Commission will formally notify the coordinator or beneficiary concerned: - informing it of its intention to suspend payments and the reasons why and - inviting it to submit observations within 30 days of receiving notification. 42 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 If the Commission does not receive observations or decides to pursue the procedure despite the observations it has received, it will formally notify confirmation of the suspension. Otherwise, it will formally notify that the suspension procedure is not continued. The suspension will take effect the day the confirmation notification is sent by the Commission. If the conditions for resuming payments are met, the suspension will be lifted. The Commission will formally notify the coordinator or beneficiary concerned. The beneficiaries may suspend implementation of the action (see Article 33.1) or terminate the Agreement or the participation of the beneficiary concerned (see Article 34.1 and 34.2). ARTICLE 33 — SUSPENSION OF THE ACTION IMPLEMENTATION 33.1 Suspension of the action implementation, by the beneficiaries 33.1.1 Conditions The beneficiaries may suspend implementation of the action or any part of it, if exceptional circumstances — in particular force majeure (see Article 35) — make implementation impossible or excessively difficult. 33.1.2 Procedure The coordinator must immediately formally notify to the Commission the suspension (see Article 36), stating: - the reasons why and - the expected date of resumption. The suspension will take effect the day this notification is received by the Commission. Once circumstances allow for implementation to resume, the coordinator must immediately formally notify the Commission and request an amendment of the Agreement to set the date on which the action will be resumed, extend the duration of the action and make other changes necessary to adapt the action to the new situation (see Article 39) — unless the Agreement or the participation of a beneficiary has been terminated (see Article 34). The suspension will be lifted with effect from the resumption date set out in the amendment. This date may be before the date on which the amendment enters into force. Costs incurred during suspension of the action implementation are not eligible (see Article 6). 33.2 Suspension of the action implementation, by the Commission 33.2.1 Conditions The Commission may suspend implementation of the action or any part of it, if: 43 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 (a) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed or is suspected of having committed: (i) substantial errors, irregularities or fraud or (ii) serious breach of obligations under this Agreement or during the award procedure (including improper implementation of the action, submission of false declaration, failure to provide required information, breach of ethical principles) or (b) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (extension of findings from other grants to this grant; see Article 17.5.2). 33.2.2 Procedure Before suspending implementation of the action, the Commission will formally notify the coordinator or beneficiary concerned: - informing it of its intention to suspend the implementation and the reasons why and - inviting it to submit observations within 30 days of receiving notification. If the Commission does not receive observations or decides to pursue the procedure despite the observations it has received, it will formally notify confirmation of the suspension. Otherwise, it will formally notify that the procedure is not continued. The suspension will take effect five days after confirmation notification is received (or on a later date specified in the notification). It will be lifted if the conditions for resuming implementation of the action are met. The coordinator or beneficiary concerned will be formally notified of the lifting and the Agreement will be amended to set the date on which the action will be resumed, extend the duration of the action and make other changes necessary to adapt the action to the new situation (see Article 39) — unless the Agreement has already been terminated (see Article 34). The suspension will be lifted with effect from the resumption date set out in the amendment. This date may be before the date on which the amendment enters into force. Costs incurred during suspension are not eligible (see Article 6). The beneficiaries may not claim damages due to suspension by the Commission (see Article 30). Suspension of the action implementation does not affect the Commission's right to terminate the Agreement or participation of a beneficiary (see Article 34), reduce the grant or recover amounts unduly paid (see Articles 27 and 28). ARTICLE 34 — TERMINATION OF THE AGREEMENT OR OF THE PARTICIPATION OF ONE OR MORE BENEFICIARIES 44 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 34.1 Termination of the Agreement by the beneficiaries 34.1.1 Conditions and procedure The beneficiaries may terminate the Agreement. The coordinator must formally notify termination to the Commission (see Article 36), stating: - the reasons why and - the date the termination will take effect. This date must be after the notification. If no reasons are given or if the Commission considers the reasons do not justify termination, the Agreement will be considered to have been ‘terminated improperly’. The termination will take effect on the day specified in the notification. 34.1.2 Effects The coordinator must — within 60 days from when termination takes effect — submit the final report (see Article 15.4). If the Commission does not receive the report(s) within the deadline (see above), no costs will be taken into account. The Commission will calculate the final grant amount (see Article 5.3) and the balance (see Article 16.4) on the basis of the report(s) submitted. Only costs incurred until termination are eligible (see Article 6). Costs relating to contracts due for execution only after termination are not eligible. Improper termination may lead to a reduction of the grant (see Article 27). After termination, the beneficiaries’ obligations (in particular, Articles 15, 17, 18, 19, 21, 22, 24, 26, 27 and 28) continue to apply. 34.2 Termination of the participation of one or more beneficiaries, by the beneficiaries 34.2.1 Conditions and procedure The participation of one or more beneficiaries may be terminated by the coordinator, on request of the beneficiary concerned or on behalf of the other beneficiaries. The coordinator must formally notify termination to the Commission (see Article 36) and inform the beneficiary concerned. If the coordinator’s participation is terminated without its agreement, the formal notification must be done by another beneficiary (acting on behalf of the other beneficiaries). The notification must include: - the reasons why; 45 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 - the opinion of the beneficiary concerned (or proof that this opinion has been requested in writing); - the date the termination takes effect. This date must be after the notification, and - a request for amendment (see Article 39), with a proposal for reallocation of the tasks and the estimated budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the addition of one or more new beneficiaries (see Article 40). If termination takes effect after the period set out in Article 3, no request for amendment must be included, unless the beneficiary concerned is the coordinator. In this case, the request for amendment must propose a new coordinator. If this information is not given or if the Commission considers that the reasons do not justify termination, the participation will be considered to have been terminated improperly. The termination will take effect on the day specified in the notification. 34.2.2 Effects The beneficiary concerned must submit to the coordinator: (i) a technical report and (ii) a financial statement covering the period to the date when termination takes effect. This information must be included by the coordinator in the final report (see Article 15.4). If the request for amendment is rejected by the Commission (because it calls into question the decision awarding the grant or breaches the principle of equal treatment of applicants), the Agreement may be terminated according to Article 34.3.1(c). If the request for amendment is accepted by the Commission, the Agreement is amended to introduce the necessary changes (see Article 39). Improper termination may lead to a reduction of the grant (see Article 27) or termination of the Agreement (see Article 34). After termination, the concerned beneficiary’s obligations (in particular Articles 15, 17, 18, 19, 21, 22, 24, 26, 27 and 28) continue to apply. 34.3 Termination of the Agreement or of the participation of one or more beneficiaries, by the Commission 34.3.1 Conditions The Commission may terminate the Agreement or the participation of one or more beneficiaries, if: (a) one or more beneficiaries do not accede to the Agreement (see Article 40); (b) a change to their legal, financial, technical, organisational or ownership situation is likely to 46 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 substantially affect or delay the implementation of the action or calls into question the decision to award the grant; (c) following termination of participation for one or more beneficiaries (see above), the necessary changes to the Agreement would call into question the decision awarding the grant or breach the principle of equal treatment of applicants (see Article 39); (d) implementation of the action is prevented by force majeure (see Article 35) or suspended by the coordinator (see Article 33.1) and either: (i) resumption is impossible, or (ii) the necessary changes to the Agreement would call into question the decision awarding the grant or breach the principle of equal treatment of applicants; (e) a beneficiary is declared bankrupt, being wound up, having its affairs administered by the courts, has entered into an arrangement with creditors, has suspended business activities, or is subject to any other similar proceedings or procedures under national law; (f) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has been found guilty of professional misconduct, proven by any means; (g) a beneficiary does not comply with the applicable national law on taxes and social security; (h) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed fraud, corruption, or is involved in a criminal organisation, money laundering or any other illegal activity; (i) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed: (i) substantial errors, irregularities or fraud or (ii) serious breach of obligations under the Agreement or during the award procedure (including improper implementation of the action, submission of false information, failure to provide required information, breach of ethical principles); (j) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions — systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant (extension of findings from other grants to this grant; see Article 17.5.2); (k) not applicable. 34.3.2 Procedure Before terminating the Agreement or participation of one or more beneficiaries, the Commission will formally notify the coordinator or beneficiary conerned: - informing it of its intention to terminate and the reasons why and 47 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 - inviting it, within 30 days of receiving notification, to submit observations and — in case of Point (i.ii) above — to inform the Commission of the measures to ensure compliance with the obligations under the Agreement. If the Commission does not receive observations or decides to pursue the procedure despite the observations it has received, it will formally notify to the coordinator or beneficiary concerned confirmation of the termination and the date it will take effect. Otherwise, it will formally notify that the procedure is not continued. The termination will take effect: - for terminations under Points (b), (c), (e), (g), (i.ii) and (k) above: on the day specified in the notification of confirmation (see above); - for terminations under Points (a), (d), (f), (h), (i.i) and (j) above: on the day after the notification of the confirmation is received. 34.3.3 Effects (a) for termination of the Agreement: The coordinator must — within 60 days from when termination takes effect — submit a final report (see Article 15.4). If the Agreement is terminated for breach of the obligation to submit report(s) (see Articles 15.8 and 34.3.1(i)), the coordinator may not submit any report(s) after termination. If the Commission does not receive the report(s) within the deadline (see above), no costs will be taken into account. The Commission will calculate the final grant amount (see Article 5.3) and the balance (see Article 16.4) on the basis of the report(s) submitted. Only costs incurred until termination takes effect are eligible (see Article 6). Costs relating to contracts due for execution only after termination are not eligible. This does not affect the Commission’s right to reduce the grant (see Article 27) or to impose administrative sanctions (Article 29). The beneficiaries may not claim damages due to termination by the Commission (see Article 30). After termination, the beneficiaries’ obligations (in particular Articles 15, 17, 18, 19, 21, 22, 24, 26, 27 and 28) continue to apply. (b) for termination of the participation of one or more beneficiaries: The coordinator must — within 60 days from when termination takes effect — submit a request for amendment (see Article 39), with a proposal for reallocation of the tasks and estimated budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the addition of one or more new beneficiaries (see Article 40). If termination is notified after the period set out 48 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 in Article 3, no request for amendment must be submitted unless the beneficiary concerned is the coordinator. In this case the request for amendment must propose a new coordinator. The beneficiary concerned must submit to the coordinator: (i) a technical report and (ii) a financial statement covering the period to the date when termination takes effect. This information must be included by the coordinator in the final report (see Article 15.4). If the request for amendment is rejected by the Commission (because it calls into question the decision awarding the grant or breaches the principle of equal treatment of applicants), the Agreement may be terminated according to Article 34.3.1(c). If the request for amendment is accepted by the Commission, the Agreement is amended to introduce the necessary changes (see Article 39). After termination, the concerned beneficiary’s obligations (in particular Articles 15, 17, 18, 19, 21, 22, 24, 26, 27 and 28) continue to apply. SECTION 4 FORCE MAJEURE ARTICLE 35 — FORCE MAJEURE ‘Force majeure’ means any situation or event that: - prevents either party from fulfilling their obligations under the Agreement, - was unforeseeable, exceptional situation and beyond the parties’ control, - was not due to error or negligence on their part (or on the part of third parties involved in the action), and - proves to be inevitable in spite of exercising all due diligence. The following cannot be invoked as force majeure: - any default of a service, defect in equipment or material or delays in making them available, unless they stem directly from a relevant case of force majeure, - labour disputes or strikes, or - financial difficulties. Any situation constituting force majeure must be formally notified to the other party without delay, stating the nature, likely duration and foreseeable effects. The parties must immediately take all the necessary steps to limit any damage due to force majeure and do their best to resume implementation of the action as soon as possible. 49 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 The party prevented by force majeure from fulfilling its obligations under the Agreement cannot be considered in breach of them. CHAPTER 7 FINAL PROVISIONS ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES 36.1 Form and means of communication Communication under the Agreement (information, requests, submissions, ‘formal notifications’, etc.) must: - be made in writing and - bear the number of the Agreement. Until the payment of the balance: all communication must be made through the electronic exchange system and using the forms and templates provided there. After the payment of the balance: formal notifications must be made by registered post with proof of delivery (‘formal notification on paper’). Communications in the electronic exchange system must be made by persons authorised according to the Participant Portal terms & conditions. For naming the authorised persons, each beneficiary must have designated — before the signature of this Agreement — a ‘legal entity appointed representative (LEAR)’. The role and tasks of the LEAR are stipulated in his/her appointment letter (see Participant Portal terms & conditions). If the electronic exchange system is temporarily unavailable, instructions will be given on the Commission websites. 36.2 Date of communication Communications are considered to have been made when they are sent by the sending party (i.e. on the date and time they are sent through the electronic exchange system). Formal notifications through the electronic exchange system are considered to have been made when they are received by the receiving party (i.e. on the date and time of acceptance by the receiving party, as indicated by the time stamp). A formal notification that has not been accepted within 10 days after sending is considered to have been accepted. Formal notifications on paper sent by registered post with proof of delivery (only after the payment of the balance) are considered to have been made on either: - the delivery date registered by the postal service or - the deadline for collection at the post office. 50 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 If the electronic exchange system is temporarily unavailable, the sending party cannot be considered in breach of its obligation to send a communication within a specified deadline. 36.3 Addresses for communication The electronic exchange system must be accessed via the following URL: https://ec.europa.eu/research/participants/portal/desktop/en/projects/ The Commission will formally notify the coordinator and beneficiaries in advance any changes to this URL. Formal notifications on paper (only after the payment of the balance) addressed to the Commission must be sent to the following address: European Commission Directorate General Justice and Consumers Programme and financial management (MO59 04/021) B-1049 Brussels BELGIUM Formal notifications on paper (only after the payment of the balance) addressed to the beneficiaries must be sent to their legal address as specified in the Participant Portal Beneficiary Register. ARTICLE 37 — INTERPRETATION OF THE AGREEMENT 37.1 Precedence of the Terms and Conditions over the Annexes The provisions in the Terms and Conditions of the Agreement take precedence over its Annexes. Annex 2 takes precedence over Annex 1. 37.2 Privileges and immunities Not applicable ARTICLE 38 — CALCULATION OF PERIODS, DATES AND DEADLINES In accordance with Regulation No 1182/7112, periods expressed in days, months or years are calculated from the moment the triggering event occurs. The day during which that event occurs is not considered as falling within the period. ARTICLE 39 — AMENDMENTS TO THE AGREEMENT 39.1 Conditions 12 Regulation (EEC, Euratom) No 1182/71 of the Council of 3 June 1971 determining the rules applicable to periods, dates and time-limits (OJ L 124, 8/6/1971, p. 1). 51 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 The Agreement may be amended, unless the amendment entails changes to the Agreement which would call into question the decision awarding the grant or breach the principle of equal treatment of applicants. Amendments may be requested by any of the parties. 39.2 Procedure The party requesting an amendment must submit a request for amendment signed in the electronic exchange system (see Article 36). The coordinator submits and receives requests for amendment on behalf of the beneficiaries (see Annex 3). If a change of coordinator is requested without its agreement, the submission must be done by another beneficiary (acting on behalf of the other beneficiaries). The request for amendment must include: - the reasons why; - the appropriate supporting documents, and - for a change of coordinator without its agreement: the opinion of the coordinator (or proof that this opinion has been requested in writing). The Commission may request additional information. If the party receiving the request agrees, it must sign the amendment in the electronic exchange system within 45 days of receiving notification (or any additional information the Commission has requested). If it does not agree, it must formally notify its disagreement within the same deadline. The deadline may be extended, if necessary for the assessment of the request. If no notification is received within the deadline, the request is considered to have been rejected. An amendment enters into force on the day of the signature of the receiving party. An amendment takes effect on the date agreed by the parties or, in the absence of such an agreement, on the date on which the amendment enters into force. ARTICLE 40 — ACCESSION TO THE AGREEMENT 40.1 Accession of the beneficiaries mentioned in the Preamble The other beneficiaries must accede to the Agreement by signing the Accession Form (see Annex 3) in the electronic exchange system (see Article 36) within 30 days after its entry into force (see Article 42). They will assume the rights and obligations under the Agreement with effect from the date of its entry into force (see Article 42). If a beneficiary does not accede to the Agreement within the above deadline, the coordinator must — within 30 days — request an amendment to make any changes necessary to ensure proper 52 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 implementation of the action. This does not affect the Commission's right to terminate the Agreement (see Article 34). 40.2 Addition of new beneficiaries In justified cases, the beneficiaries may request the addition of a new beneficiary. For this purpose, the coordinator must submit a request for amendment in accordance with Article 39. It must include an Accession Form (see Annex 3) signed by the new beneficiary in the electronic exchange system (see Article 36). New beneficiaries must assume the rights and obligations under the Agreement with effect from the date of their accession specified in the Accession Form (see Annex 3). ARTICLE 41 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES 41.1 Applicable law The Agreement is governed by the applicable EU law, supplemented if necessary by the law of Belgium. 41.2 Dispute settlement If a dispute concerning the interpretation, application or validity of the Agreement cannot be settled amicably, the General Court — or, on appeal, the Court of Justice of the European Union — has sole jurisdiction. Such actions must be brought under Article 272 of the Treaty on the Functioning of the EU (TFEU). If a dispute concerns administrative sanctions, offsetting or an enforceable decision under Article 299 TFEU (see Articles 28, 29 and 30), the beneficiaries must bring action before the General Court — or, on appeal, the Court of Justice of the European Union — under Article 263 TFEU. 53 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 JUST/REC Associated with document MGA — Multi:-v2.0 Ref. Ares(2017)6150899 14/12/2017 ARTICLE 42 — ENTRY INTO FORCE OF THE AGREEMENT The Agreement will enter into force on the day of signature by the Commission or the coordinator, depending on which is later. SIGNATURES For the coordinator For the Commission [--TGSMark#signature-998429731_75_210--] [--TGSMark#signature-service_75_210--] Marika PRISKE with ECAS id nprmaika signed in the Signed by Daniela BANKIER with ECAS id bankida as an Participant Portal on 18/12/2017 at 11:24:22 (transaction id authorised representative on 19-12-2017 12:41:11 SigId-159732- (transaction id SigId-187321- FkCllasjvVUF3zN4Z3tQUyVNUGgcQ5uWFJGA3ZUntvl1J JccqiqN6dGhouKXfazQTN2FSDrD9LATeLLByzXVaBjXYC MyASXul8Xh4jbexUBzJpAzgnKitXU1fWkFmsLy4ZH0- OSMzu5DMl3qmzzcTTC6n36Qmey5kzq27MbJL0Jg2zT8- PHslUMVSXYCIMrSeUedOzH- PHslUMVSXYCIMrSeUedOzH- Lozup3ClSaUub418gznzPzvn8uTfswYGwHU0vHt4mblJ). XbCDQXYzSbFktsRZIirWDvF2UlzIEo1C3ssnZCTAVE0m) Timestamp by third party at Tue Dec 19 12:41:15 CET 2017 Mon Dec 18 11:24:40 CET 2017 54 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE AND CONSUMERS Programme and financial management ANNEX 1 (part A) REC Action Grant NUMBER — 764255 — BADEV Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Table of Contents 1.1. The project summary................................................................................................................................. 3 1.2. The list of beneficiaries..............................................................................................................................5 1.3. Workplan Tables - Detailed implementation..............................................................................................6 1.3.1. WT1 List of work packages........................................................................................................... 6 1.3.2. WT2 List of deliverables................................................................................................................ 7 1.3.3. WT3 Work package descriptions................................................................................................. 10 Work package 1......................................................................................................................... 10 Work package 2......................................................................................................................... 14 Work package 3......................................................................................................................... 20 Work package 4......................................................................................................................... 23 1.3.4. WT4 List of milestones................................................................................................................ 25 1.3.5. WT5 Critical Implementation risks and mitigation actions........................................................... 26 1.3.6 WT6 Summary of project effort in person-months........................................................................27 1.3.7. WT7 Tentative schedule of project reviews.................................................................................28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 1.1. The project summary Project Number 1 764255 Project Acronym 2 BADEV One form per project General information Project title 3 Enhancing Barnahus model service delivery in Estonia, Latvia and Poland Starting date 4 01/02/2018 Duration in months 5 24 Call (part) identifier 6 REC-CHILD-AG-2016-01 REC-RDAP-CHIL-AG-2016 Topic To support integrated and multidisciplinary child-centred approaches to child victims of violence Fixed EC Keywords Children's house model, piloting enhanced service delivery, capacity rising of Free keywords professionals. Abstract 7 Objectives Overall: to contribute to the development of integrated child protection systems by providing multidisciplinary child- centred approaches in the project partner countries. Specific: • To develop children’s house models • To improve knowledge and exchange good practices for setting up children’s houses • To enhance the capacity of stakeholders to handle cases involving child victims of violence • To widen networking between stakeholders • To ensure that only evidence-based service delivery methods are used Activities WP1: management and information dissemination activities WP2: training plan development, trainings, guideline and information material development WP3: piloting the service, assessing the service delivery WP4: collecting and assessing therapies, developing, technological platform Type and number of persons benefiting from the project - children in children’s houses / their families: 70 in Estonia, 30 Latvia, Poland 98 - Stakeholders: 510 in Estonia, 190 in Latvia, 105 Poland Expected results - Improved knowledge and exchanged good practices in partner countries for setting up and developing the children’s house model - Enhanced capacity of children’s house workers and network members to handle cases involving child victims of violence - Widened cooperation and networking between stakeholders and increased awareness about the service delivery model in the public - Evidence-based service delivery models are used in children’s houses Type and number of outputs to be produced - Administrative reports - 6 steering committee meeting minutes - Final conference (100-150 participants) - 12 press releases - 24 articles and media coverage - 6 local stakeholder meetings - 1 joint syllabus - 510 Estonian trainees - 160 Latvian trainees - 70 Polish trainees - 45 trainees in joint trainings Page 3 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 1.1. The project summary - 11 different guidelines - Children / families counselled: 70 Estonia, 30 Latvia, Poland 98 - 1 therapy platform - 15 therapies collected to platform Page 4 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 1.2. List of Beneficiaries Project Number 1 764255 Project Acronym 2 BADEV List of Beneficiaries Project Project No Name Short name Country entry exit month8 month 1 SOTSIAALMINISTEERIUM MSAE Estonia 1 24 2 NODIBINAJUMS CENTRS DARDEDZE Centrs Dardedze Latvia 1 24 3 FUNDACJA DAJEMY DZIECIOM SILE FDDS Poland 1 24 Page 5 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 1.3. Workplan Tables - Detailed implementation 1.3.1. WT1 List of work packages WP Person- Start End WP Title Lead beneficiary10 Number9 months11 month12 month13 Management and Coordination of WP1 1 - MSAE 42.40 1 24 the Project Capacity rising, network WP2 2 - Centrs Dardedze 36.00 1 22 development and sustainability Enhancing the service delivery in WP3 children's houses fitting the national 3 - FDDS 36.00 3 23 context of project partner countries WP4 Therapy platform development 1 - MSAE 1.25 1 23 Total 115.65 Page 6 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 1.3.2. WT2 list of deliverables Due Deliverable WP Dissemination Deliverable Title Lead beneficiary Type 15 Date (in Number14 number9 level16 months)17 Confidential, only for members of the consortium D1.1 Progress report to EC WP1 1 - MSAE Report 13 (including the Commission Services) Confidential, only for members 6 steering committee of the consortium D1.2 WP1 1 - MSAE Other 24 meetings (including the Commission Services) Final international D1.3 WP1 1 - MSAE Other Public 23 conference 4 Press releases in D1.4 WP1 1 - MSAE Report Public 24 Estonia 8 Articles and other D1.5 media coverage - WP1 1 - MSAE Report Public 24 Estonia 2 Local stakeholder D1.6 WP1 1 - MSAE Other Public 22 meetings - Estonia 4 Press releases in D1.7 WP1 2 - Centrs Dardedze Report Public 24 Latvia 4 Press releases in D1.8 WP1 3 - FDDS Report Public 24 Poland 8 Articles and other D1.9 WP1 2 - Centrs Dardedze Report Public 24 media coverage - Latvia 8 Articles and other D1.10 media coverage - WP1 3 - FDDS Report Public 24 Poland 2 Local stakeholder D1.11 WP1 2 - Centrs Dardedze Other Public 22 meetings - Latvia 2 Local stakeholder D1.12 WP1 3 - FDDS Other Public 22 meetings - Poland Confidential, only for members Final assessment of all of the consortium D1.13 WP1 1 - MSAE Report 24 project activities (including the Commission Services) Joint syllabus in D2.1 WP2 1 - MSAE Report Public 2 Estonia D2.2 Estonian trainings WP2 1 - MSAE Other Public 20 D2.3 Latvian trainings WP2 2 - Centrs Dardedze Other Public 20 Page 7 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Due Deliverable WP Dissemination Deliverable Title Lead beneficiary Type15 Date (in Number14 number9 level16 months)17 D2.4 Polish trainings WP2 3 - FDDS Other Public 20 D2.5 Joint trainings WP2 2 - Centrs Dardedze Other Public 22 Poland - Elaborating protocols, guidelines, standards for D2.6 WP2 3 - FDDS Report Public 21 multisectoral cooperation within CAC D2.7 Joint syllabus in Latvia WP2 2 - Centrs Dardedze Report Public 2 D2.8 Joint syllabus in Poland WP2 3 - FDDS Report Public 2 Poland - Elaborating D2.9 guidelines on working WP2 3 - FDDS Report Public 21 post-traumatic children Estonia - Elaborating D2.10 guidelines to handle WP2 1 - MSAE Report Public 21 sexual abuse cases Estonia - Elaborating information material about Childs´s House D2.11 WP2 1 - MSAE Report Public 21 (model, network etc) for specialist working with children Estonia - Elaborating guidelines for D2.12 interviewing children WP2 1 - MSAE Report Public 21 with special needs (disabled and migrant) Estonia - Elaborating D2.13 guidelines on working WP2 1 - MSAE Report Public 21 post-traumatic children Estonia - Elaborating guidelines for D2.14 WP2 1 - MSAE Report Public 21 interviewing children using sign language Latvia - Elaborating protocols, guidelines, standards for D2.15 WP2 2 - Centrs Dardedze Report Public 21 multisectoral cooperation within Children`s House Latvia - Elaborating D2.16 guidelines on working WP2 2 - Centrs Dardedze Report Public 21 post-traumatic children Latvia - Training materials for joint D2.17 WP2 2 - Centrs Dardedze Report Public 21 investigative teams in future regional Page 8 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Due Deliverable WP Dissemination Deliverable Title Lead beneficiary Type15 Date (in Number14 number9 level16 months)17 Children`s House locations (4 regions) Confidential, only for members Mid-evaluation of of the consortium D2.18 WP2 2 - Centrs Dardedze Report 14 trainings (including the Commission Services) Confidential, only for members Final evaluation of of the consortium D2.19 WP2 2 - Centrs Dardedze Report 22 trainings (including the Commission Services) New services piloted in D3.1 WP3 1 - MSAE Other Public 21 Estonia New services piloted in D3.2 WP3 2 - Centrs Dardedze Other Public 21 Latvia New services piloted in D3.3 WP3 3 - FDDS Other Public 21 Poland Confidential, only for members Mid-evaluation of of the consortium D3.4 WP3 3 - FDDS Report 7 services (including the Commission Services) Confidential, only for members Final evaluation of of the consortium D3.5 WP3 3 - FDDS Report 22 services (including the Commission Services) Report on requirements (conceptual and IT) for D4.1 WP4 1 - MSAE Report Public 5 the therapy platform tool Websites, Therapy platform D4.2 WP4 1 - MSAE patents Public 6 online tool filling, etc. Guide for the therapy D4.3 WP4 1 - MSAE Report Public 13 platform tool D4.4 Toolkit WP4 1 - MSAE Report Public 23 Page 9 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 1.3.3. WT3 Work package descriptions Work package number 9 WP1 Lead beneficiary 10 1 - MSAE Work package title Management and Coordination of the Project Start month 1 End month 24 Objectives The objective of the WP is to ensure the smooth and effective management of the project, achieving all objectives and results in time and with agreed-upon quality criteria. Description of work and role of partners WP1 - Management and Coordination of the Project [Months: 1-24] MSAE, Centrs Dardedze, FDDS 1. Administrative and financial management of the project (All partners in their country. Overall responsibility: MSAE) 2. Information dissemination activities (All partners in their country. Overall responsibility: MSAE) 3. Local stakeholder meetings (All partners in their country. Overall responsibility: MSAE) Participation per Partner Partner number and short name WP1 effort 1 - MSAE 26.40 2 - Centrs Dardedze 8.00 3 - FDDS 8.00 Total 42.40 List of deliverables Due Deliverable Deliverable Title Lead beneficiary Type 15 Dissemination level 16 Date (in Number14 months)17 Confidential, only for members of the D1.1 Progress report to EC 1 - MSAE Report consortium (including 13 the Commission Services) Confidential, only for members of the 6 steering committee D1.2 1 - MSAE Other consortium (including 24 meetings the Commission Services) Final international D1.3 1 - MSAE Other Public 23 conference 4 Press releases in D1.4 1 - MSAE Report Public 24 Estonia Page 10 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 List of deliverables Due Deliverable Deliverable Title Lead beneficiary Type 15 Dissemination level 16 Date (in Number14 months)17 8 Articles and other D1.5 1 - MSAE Report Public 24 media coverage -Estonia 2 Local stakeholder D1.6 1 - MSAE Other Public 22 meetings - Estonia D1.7 4 Press releases in Latvia 2 - Centrs Dardedze Report Public 24 D1.8 4 Press releases in Poland 3 - FDDS Report Public 24 8 Articles and other D1.9 2 - Centrs Dardedze Report Public 24 media coverage - Latvia 8 Articles and other D1.10 3 - FDDS Report Public 24 media coverage - Poland 2 Local stakeholder D1.11 2 - Centrs Dardedze Other Public 22 meetings - Latvia 2 Local stakeholder D1.12 3 - FDDS Other Public 22 meetings - Poland Confidential, only for members of the Final assessment of all D1.13 1 - MSAE Report consortium (including 24 project activities the Commission Services) Description of deliverables 1. Steering committee meetings. 2. Final international conference 100-150 participants. 3. Press releases (electronic, printed, Estonian, Latvian, Polish) -4 per country, 12 in total. 4. Articles and other media coverage (electronic, printed, Estonian, Latvian, Polish - 8 per country, 24 in total. 5. Local stakeholder meetings - 2 per country, 6 in total. 6. Final assessment of all project activities. D1.1 : Progress report to EC [13] Progress report to EC after the mid-term period of Project (in EN). D1.2 : 6 steering committee meetings [24] Tangible results: -Electronic minutes in English reflecting the steering committee meetings (6 in total). -Signed lists of participants; -Agenda. D1.3 : Final international conference [23] 100-150 participants. At the end of the project together with the wrapping-up final meeting of the project, applicant will organize an international conference. The representatives of Partner organizations will participate in the conference and present their good practices. The main topic of the conference will be the different aspects of children’s house model implementation. The international and local speakers will discuss inter-agency and interdisciplinary cooperation, the child-friendly interviewing, different approaches of therapeutic support provided to children victims of abuse and their families as well as the latest empirical and theoretical facts and data concerning the problem of child abuse and neglect. Program of the conference will include plenary sessions, lectures and workshops in smaller groups. Tangible results: Conference agenda, materials in Estonian, Latvian, Polish and English, signed participant list, feedback questionnaire, electronic minutes in English reflecting the closing conference. Target group: Project partner organizations, stakeholders, including authorities, professionals, Page 11 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 representatives of health sector, education, social services, judges, prosecutors, teachers, psychologists, pedagogues etc. D1.4 : 4 Press releases in Estonia [24] 4 Press releases (electronic, printed, Estonian) Target group: Wider public. D1.5 : 8 Articles and other media coverage -Estonia [24] 8 Articles and other media coverage (electronic, printed, Estonian) Target group: Wider public. D1.6 : 2 Local stakeholder meetings - Estonia [22] 2 Local stakeholder meetings. The stakeholders (social services, local authorities, prosecution, forensic interviewers and others depending on country specifics, approx. 30 persons per country) meet to analyze and support the implementation of the project (including the elaboration of guidelines). Invitation, agenda, signed presence list, minutes of the meeting in English. Target group: Project partner organizations, stakeholders. D1.7 : 4 Press releases in Latvia [24] 4 Press releases (electronic, printed, Latvia) Target group: Wider public. D1.8 : 4 Press releases in Poland [24] 4 Press releases (electronic, printed, Polish) Target group: Wider public. D1.9 : 8 Articles and other media coverage - Latvia [24] 8 Articles and other media coverage (electronic, printed, Latvian) Target group: Wider public. D1.10 : 8 Articles and other media coverage - Poland [24] 8 Articles and other media coverage (electronic, printed, Polish) Target group: Wider public. D1.11 : 2 Local stakeholder meetings - Latvia [22] 2 Local stakeholder meetings The stakeholders (social services, local authorities, prosecution, forensic interviewers and others depending on country specifics, approx. 30 persons per country) meet to analyze and support the implementation of the project (including the elaboration of guidelines). Invitation, agenda, signed presence list, minutes of the meeting in English. Target group: Project partner organizations, stakeholders. D1.12 : 2 Local stakeholder meetings - Poland [22] 2 Local stakeholder meetings The stakeholders (social services, local authorities, prosecution, forensic interviewers and others depending on country specifics, approx. 30 persons per country) meet to analyze and support the implementation of the project (including the elaboration of guidelines). Invitation, agenda, signed presence list, minutes of the meeting in English. Target group: Project partner organizations, stakeholders. D1.13 : Final assessment of all project activities [24] Final assessment of all project activities, incl feedback from all project members - electronic, in EN. Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) First and second stakeholder MS1 Stakeholder meetings 1 and 2 1 - MSAE 9 meeting held. All stakeholder meetings All stakeholder meetings MS6 1 - MSAE 22 held. held. Final assessment of all project Final assessment of all project MS9 1 - MSAE 24 activities, incl feedback from activities all project members. Regular partners Administrative and financial MS10 1 - MSAE 24 administrative and financial reports reports. Electronic reports Page 12 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) in English covering all relevant aspects of the project activities during the reporting period. Page 13 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Work package number 9 WP2 Lead beneficiary 10 2 - Centrs Dardedze Work package title Capacity rising, network development and sustainability Start month 1 End month 22 Objectives The objective of the workpackage is to ensure that the children’s house workers and network members have the full capacity to provide various therapies and interventions effectively and efficiently and to guarantee that all relevant stakeholders and wider public are aware of the role and possibilities children’s house has in the society. Description of work and role of partners WP2 - Capacity rising, network development and sustainability [Months: 1-22] Centrs Dardedze, MSAE, FDDS 1 Joint training plan / syllabus development.(All partners). 2. Carrying out trainings in project partner countries. (MSAE) The provisional themes for Estonia are: (Ministry of Social Affairs together with Estonian Social Insurance Board) • Awareness raising of the children’s house conception • Working with post-traumatic children • Interviewing children with special needs (including immigrant children) • How to handle cases involving mistreated children using sign language • How to interview child victims of violence meeting the criteria foreseen in children’s house The provisional themes for Latvia are: (Dardedze) • Multisectoral cooperation • Training for joint investigative teams in future regional Children`s House locations • Training on narrative therapy The provisional themes for Poland are: (PECF) • Training on narrative therapy. • Training on sand therapy • Training for joint investigative teams in pilot CAC locations The provisional themes for joint trainings are (All partners) • Post trauma therapy (in two parts) • Multisectoral cooperation Guidelines and information material development: (All partners) • Elaborating protocols, guidelines, standards for multisectoral cooperation within CAC in Poland • Elaborating guidelines on working post-traumatic children in Poland • Elaborating guidelines to handle sexual abuse cases in Estonia • Elaborating information material about Child's House (model, network etc.) for specialist working with children in Estonia • Elaborating guidelines for interviewing children with special needs (disabled and migrant) in Estonia • Elaborating guidelines on working post-traumatic children in Estonia • Elaborating guidelines for interviewing children using sign language in Estonia • Elaborating protocols, guidelines, standards for multisectoral cooperation within Children's House in Latvia. • Elaborating guidelines on working post-traumatic children in Latvia • Training materials for joint investigative teams in future regional Children`s House locations (4 regions) in Latvia. Participation per Partner Partner number and short name WP2 effort 1 - MSAE 12.00 Page 14 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Partner number and short name WP2 effort 2 - Centrs Dardedze 12.00 3 - FDDS 12.00 Total 36.00 List of deliverables Due Deliverable Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in Number14 months)17 D2.1 Joint syllabus in Estonia 1 - MSAE Report Public 2 D2.2 Estonian trainings 1 - MSAE Other Public 20 D2.3 Latvian trainings 2 - Centrs Dardedze Other Public 20 D2.4 Polish trainings 3 - FDDS Other Public 20 D2.5 Joint trainings 2 - Centrs Dardedze Other Public 22 Poland - Elaborating protocols, guidelines, D2.6 standards for 3 - FDDS Report Public 21 multisectoral cooperation within CAC D2.7 Joint syllabus in Latvia 2 - Centrs Dardedze Report Public 2 D2.8 Joint syllabus in Poland 3 - FDDS Report Public 2 Poland - Elaborating D2.9 guidelines on working 3 - FDDS Report Public 21 post-traumatic children Estonia - Elaborating D2.10 guidelines to handle 1 - MSAE Report Public 21 sexual abuse cases Estonia - Elaborating information material about Childs´s House D2.11 1 - MSAE Report Public 21 (model, network etc) for specialist working with children Estonia - Elaborating guidelines for D2.12 interviewing children 1 - MSAE Report Public 21 with special needs (disabled and migrant) Estonia - Elaborating D2.13 guidelines on working 1 - MSAE Report Public 21 post-traumatic children Estonia - Elaborating guidelines for D2.14 1 - MSAE Report Public 21 interviewing children using sign language Page 15 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 List of deliverables Due Deliverable Deliverable Title Lead beneficiary Type 15 Dissemination level 16 Date (in Number14 months)17 Latvia - Elaborating protocols, guidelines, D2.15 standards for 2 - Centrs Dardedze Report Public 21 multisectoral cooperation within Children`s House Latvia - Elaborating D2.16 guidelines on working 2 - Centrs Dardedze Report Public 21 post-traumatic children Latvia - Training materials for joint investigative teams D2.17 2 - Centrs Dardedze Report Public 21 in future regional Children`s House locations (4 regions) Confidential, only for members of the Mid-evaluation of D2.18 2 - Centrs Dardedze Report consortium (including 14 trainings the Commission Services) Confidential, only for members of the Final evaluation of D2.19 2 - Centrs Dardedze Report consortium (including 22 trainings the Commission Services) Description of deliverables 1. Joint syllabus in Estonia (MSAE). Target group: Project partner organizations and stakeholders. 2. Joint syllabus in Poland (PECF). Target group: Project partner organizations and stakeholders. 3. Joint syllabus in Latvia (Dardedze). Target group: Project partner organizations and stakeholders. 4. Estonian trainings. Target group: Project partner organizations and stakeholders, children’s house workers, 116 111 counsellors. 5. Latvian trainings. Target group: Project partner organizations and stakeholders, children’s house staff; members of joint investigative teams– (e.g. forensic interviewers, judges, prosecutors, psychologists, social workers, medicals experts). 6. Polish trainings. Target group: Project partner organizations and stakeholders, children’s house staff. 7. Joint trainings. Target group: Project partner organizations and stakeholders, children’s house staff. 8. Guidelines: Target group: Project partner organizations and stakeholders, children’s house staff. Guidelines and information material development: • Elaborating protocols, guidelines, standards for multisectoral cooperation within CAC in Poland • Elaborating guidelines on working post-traumatic children in Poland • Elaborating guidelines to handle sexual abuse cases in Estonia • Elaborating information material about Childs´s House (model, network etc.) for specialist working with children in Estonia • Elaborating guidelines for interviewing children with special needs (disabled and migrant) in Estonia • Elaborating guidelines on working post-traumatic children in Estonia • Elaborating guidelines for interviewing children using sign language in Estonia Page 16 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 • Elaborating guidelines on working post-traumatic children in Latvia • Elaborating protocols, guidelines, standards for multisectoral cooperation within Children's House in Latvia. • Implement and evaluate “Recommendations for Barnahus model in Latvia” in Riga, in Centre Dardedze (30 cases). • Revising existing guidelines and practices in 4 regional crisis centres in the scope of “Recommendations for Barnahus model in Latvia”. • Training materials for joint investigative teams in future regional Children`s House locations (4 regions) in Latvia. 9. Mid and final evaluation of trainings. D2.1 : Joint syllabus in Estonia [2] Electronic syllabus in English for each partner country focusing at specific counselling skills, interviewing skills, working with children with special needs, child psychology, co-operation and network skills, capacity to handle international cases, ICT skills etc. Target group: Project partner organisations and stakeholders. D2.2 : Estonian trainings [20] Estonian trainings Awareness rising of the children’s house conception. 250 Estonian specialists working with children (including substitute home workers, child protectors, teachers from schools and kindergartens etc) will take part in the 4-hour event. Two trainings with 125 participants respectively will be organised. Deliverables: invitation, agenda, signed presence list, materials, activity report in EN, feedback questionnaire in Estonian. Working with post- traumatic children. 200 specialists working at shelters, substitute homes and substitute families etc will take part in the 1-day training. Four trainings with 50 participants in each group will be organised. Deliverables: invitation, agenda, signed presence list, materials, activity report in EN, feedback questionnaire in Estonian. Interviewing children with special needs (including immigrant children and disabled children). 40 specialists conducting such interviews (children’s house workers, police officers etc) will take part in the 2-day training. Two training sessions with 20 participants in each group will be organised. Deliverables: invitation, agenda, signed presence list, materials, activity report in EN, feedback questionnaire in Estonian. How to handle cases involving mistreated children using sign language. 10 sign language interpreters will participate in the 1 day training. Deliverables: invitation, agenda, signed presence list, materials, activity report in EN, feedback questionnaire in Estonian. How to interview child victims of violence meeting the criteria foreseen in children’s house. 10 116 111 helpline counsellors will participate in the 2 day training. Deliverables: invitation, agenda, signed presence list, materials, activity report in EN, feedback questionnaire in Estonian. Target group: Project partner organisations and stakeholders, children’s house workers, 116 111 counsellors. D2.3 : Latvian trainings [20] Latvian trainings Multisectoral cooperation: Five 3 days trainings for representatives of different agencies and institutions (4 people teams – social worker, prosecutor, police officer, health sector) on cooperation in the cases of sexual abuse against children + introducing Children`s house model will be conducted. The objective of the trainings will be to learn how to provide high-quality child-friendly services to children- victims and how to support their families, to identify the role, specifics and responsibilities of each cooperating agencies and institutions and to introduce an efficient, practical model of inter-agency and interdisciplinary cooperation. The trainings will be organized for 5 different regions (25 municipalities), reaching 4x5=20 people x 5 locations =100 people. Deliverables: invitation, agenda, signed presence list, materials, activity report in EN, feedback questionnaire in Latvian. Training for joint investigative teams in future regional Children`s House locations – crisis centres in 4 regions. For the effective future implementation of the model in Latvia it is necessary to train the teams in four regions of Latvia. 4 teams, 15 participants each, will be trained on the protocols, guidelines, standards for multidisciplinary cooperation and basic principles on forensic interviewing. (2 trainers, 4x2 day trainings will be conducted in 4 locations, 15 participants each, 60 people trained in total). Deliverables: invitation, agenda, signed presence list, materials, activity report in EN, feedback questionnaire in Latvian. Narrative therapy: Latvian experts (4 people)will participate in the training organized by the Polish partner in Poland. Deliverables: invitation, agenda, signed presence list, materials, activity report in EN, feedback questionnaire. Target group: Project partner organisations and stakeholders, children’s house staff; members of joint investigative teams– (e.g. forensic interviewers, judges, prosecutors, psychologists, social workers, medicals experts). D2.4 : Polish trainings [20] Polish trainings Narrative therapy is a research based on effective therapeutic approach used for group and individual therapy for older children victims of abuse and adults (their families). 15 therapists working in local Children Advice Centers (CAC) from Poland will participate in the 5 –day training. Deliverables: invitation, agenda, signed presence list, materials, activity report in EN, feedback questionnaire in Polish. Sand therapy is a research based, effective therapeutic approach used for assessment and individual therapy for small children- victims of abuse. 15 therapists working in local CACs from Poland will participate in the 5 – day training. Deliverables: invitation, agenda, signed Page 17 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 presence list, materials, activity report in EN, feedback questionnaire in Polish. Training for joint investigative teams in pilot CAC locations. Trainings for the members of joint investigative teams on child –friendly interviewing protocol and techniques will be organized. 4 x 2 –day trainings will be conducted in Poland (1 in Warsaw and 3 in other CAC’s locations) for approximately 25 persons. Deliverables: invitation, agenda, signed presence list, materials, activity report in EN, feedback questionnaire in Polish. Target group: Project partner organisations and stakeholders, children’s house staff. D2.5 : Joint trainings [22] Joint trainings Post-trauma therapy: Trainings will be organised for up to 10 specialists working with child victims from each project partner country (30 persons in total). Two-day training will be organised in Estonia at the beginning of the project and one-day training at the end. Deliverables: invitation, agenda, signed presence list, materials, activity report in EN, feedback questionnaire in English. Multisectoral cooperation: 5 persons from each partner country will participate in the training and study visit (two days). It will be the opportunity to share good practices and challenges regarding the developing and implementing of CAC’s model of operation in project’s partner countries and to visit the Estonian partner’s facilities. Foreign expert from one of Scandinavian’s Barnahuses will be invited to present good practice of multisectoral cooperation. Deliverables: invitation, agenda, signed presence list, materials, activity report in EN, feedback questionnaire in English. Target group: Project partner organisations and stakeholders, children’s house staff. D2.6 : Poland - Elaborating protocols, guidelines, standards for multisectoral cooperation within CAC [21] The aim is the set standards and guidelines in all the areas of CAC’s operation such us forensic interviews, victim support, medical examinations, therapeutic services as well as facilitate the work of multidisciplinary team: forensic interviewers, lawyers, medical doctors, therapists and social workers by establishing clear, step by step protocols of cooperation. Guidelines will be in Polish, in electronic format, made available at partner and stakeholder websites. Target group: Project partner organizations and stakeholders, children’s house staff, wider public. D2.7 : Joint syllabus in Latvia [2] Electronic syllabus in English for each partner country focusing at specific counselling skills, interviewing skills, working with children with special needs, child psychology, co-operation and network skills, capacity to handle international cases, ICT skills etc Target group: Project partner organisations and stakeholders D2.8 : Joint syllabus in Poland [2] Electronic syllabus in English for each partner country focusing at specific counseling skills, interviewing skills, working with children with special needs, child psychology, co-operation and network skills, capacity to handle international cases, ICT skills etc Target group: Project partner organisations and stakeholders. D2.9 : Poland - Elaborating guidelines on working post-traumatic children [21] The aim of the guidelines is to explain the different aspects of working with post-traumatic children, including how to interview post-traumatic children. The guidelines will be in Polish, 1000 copies + online. Target group: Project partner organizations and stakeholders, children’s house staff, wider public. D2.10 : Estonia - Elaborating guidelines to handle sexual abuse cases [21] The aim of the guideline is to raise the awareness on identifying sexual abuse cases, how to handle such cases and how to recognize such children. The guidelines will be made for specialists working with children. Guidelines will be provided in Estonian and Russian language, 1000 copies + online Target group: Project partner organizations and stakeholders, children’s house staff, wider public. D2.11 : Estonia - Elaborating information material about Childs´s House (model, network etc) for specialist working with children [21] The aim of the guidelines is to inform specialists working with children about the network handling child victim cases, what is the role of each specialist in that network and to explain how the Children´s House model functions within the network. Guidelines will be provided in Estonian and Russian, 1000 copies + online Target group: Project partner organizations and stakeholders, children’s house staff, wider public. D2.12 : Estonia - Elaborating guidelines for interviewing children with special needs (disabled and migrant) [21] The aim of the guidelines is to explain the different aspects of working with children who have special needs, including conducting interviews. The guidelines will be in Estonian and Russian, 1000 copies + online. Target group: Project partner organizations and stakeholders, children’s house staff, wider public. D2.13 : Estonia - Elaborating guidelines on working post-traumatic children [21] Page 18 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 The aim of the guidelines is to explain the different aspects of working with post-traumatic children, including how to interview post-traumatic children. The guidelines will be in Estonian and Russian, 1000 copies + online. Target group: Project partner organizations and stakeholders, children’s house staff, wider public. D2.14 : Estonia - Elaborating guidelines for interviewing children using sign language [21] The aim of the guidelines is to explain the different aspects of working with children who need sign language in order to communicate, including how to conducting interviews. The guidelines will be in Estonian and Russian, 100 copies + online Target group: Project partner organizations and stakeholders, children’s house staff, wider public. D2.15 : Latvia - Elaborating protocols, guidelines, standards for multisectoral cooperation within Children`s House [21] The aim is to set standards and guidelines in all the areas of Children`s House operation such us forensic interviews, victim support, medical examinations, therapeutic services as well as facilitate the work of multidisciplinary team: forensic interviewers, lawyers, medical doctors, therapists and social workers by establishing clear, step by step protocols of cooperation. The documents will be based on the standards and good practices developed by PROMISE network and of the National Alliance of Child Advocacy Centres and input from stakeholders. The guidelines will be in Latvian and Russian, 1000 copies + online. • Implement and evaluate “Recommendations for Barnahus model in Latvia” in Riga, in Centre Dardedze (30 cases). • Revising existing guidelines and practices in 4 regional crisis centres in the scope of “Recommendations for Barnahus model in Latvia”. Target group: Project partner organizations and stakeholders, children’s house staff, wider public. D2.16 : Latvia - Elaborating guidelines on working post-traumatic children [21] The aim of the guidelines is to explain the different aspects of working with post-traumatic children, including how to interview post-traumatic children. The guidelines will be in Latvian, 1000 copies + online. Target group: Project partner organizations and stakeholders, children’s house staff, wider public. D2.17 : Latvia - Training materials for joint investigative teams in future regional Children`s House locations (4 regions) [21] Based on the protocols, guidelines, standards for multisectoral cooperation training resources containing information about child development stages, guidelines, techniques and protocols for child-friendly interviewing and multisectoral cooperation on reacting and investigating child sexual abuse cases will be developed. The guidelines will be in Latvian and Russian, 2000 copies+ online. Target group: Project partner organizations and stakeholders, children’s house staff, wider public. D2.18 : Mid-evaluation of trainings [14] Mid-evaluation of trainings held in 3 countries - electronic, in EN. D2.19 : Final evaluation of trainings [22] Final evaluation of joint trainings in 3 countries - electronic, in EN. Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) Mid-evaluation of trainings in MS4 Mid evaluation of trainings 2 - Centrs Dardedze 14 3 countries. Final evaluation of joint Final evaluation of joint MS5 2 - Centrs Dardedze 22 trainings. trainings in 3 countries. Final assessment of all project Final assessment of all project MS9 1 - MSAE 24 activities, incl feedback from activities all project members. Page 19 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Work package number 9 WP3 Lead beneficiary 10 3 - FDDS Enhancing the service delivery in children's houses fitting the national context of project Work package title partner countries Start month 3 End month 23 Objectives The objective of the workpackage is to enhance the service delivery model in Estonia and Poland and create the preconditions and readiness in Latvia to pilot the model post-project. Description of work and role of partners WP3 - Enhancing the service delivery in children's houses fitting the national context of project partner countries [Months: 3-23] FDDS, MSAE, Centrs Dardedze Estonia: (MSAE) • providing family therapy, group counselling, individual face-to-face counselling in the children’s house • integrating phone / e-counselling (116 111 service) into the system • assessing the quality of the services provided (intermediate evaluation, final evaluation). • Supervision of the staff - 1 day supervision for the Children’s House workers will take place. Poland: (PECF) • Providing narrative therapy (individual and group therapy) • Providing sand therapy Latvia: (Dardedze) • Piloting the elaborated guidelines, protocols, manual and narrative therapy in Riga region (30 cases). Participation per Partner Partner number and short name WP3 effort 1 - MSAE 12.00 2 - Centrs Dardedze 12.00 3 - FDDS 12.00 Total 36.00 List of deliverables Due Deliverable Deliverable Title Lead beneficiary Type 15 Dissemination level 16 Date (in Number14 months)17 New services piloted in D3.1 1 - MSAE Other Public 21 Estonia New services piloted in D3.2 2 - Centrs Dardedze Other Public 21 Latvia New services piloted in D3.3 3 - FDDS Other Public 21 Poland Mid-evaluation of Confidential, only D3.4 3 - FDDS Report 7 services for members of the Page 20 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 List of deliverables Due Deliverable Deliverable Title Lead beneficiary Type 15 Dissemination level 16 Date (in Number14 months)17 consortium (including the Commission Services) Confidential, only for members of the Final evaluation of D3.5 3 - FDDS Report consortium (including 22 services the Commission Services) Description of deliverables 1. New services piloted in Estonia. Target group. children, their families. 2. New services piloted in Latvia. Target group: children, their families. 3. New services piloted in Poland. Target group: children, their families. 4. Intermediate and final evaluation of services in 3 countries. D3.1 : New services piloted in Estonia [21] Piloting of the 4 services elaborated: family therapy, group counselling, individual face-to-face counselling in the children’s house, integrating phone / e- counselling (116 111 service) into the system: 1. 30 children 2. 40 adults (two groups, each containing 20 persons) Supervision of the staff - 1 day supervision for the Children’s House workers will take place. Assessing the service provision on two adult groups (2x12) and one on children (1x15). Tangible results: activity report in EN, signed presence list, feedback questionnaire in Estonian. Target group: children, their families D3.2 : New services piloted in Latvia [21] Piloting the elaborated guidelines, protocols, manual and and narrative therapy reaching for 30 cases of children/ families counselled in Riga region. Tangible results: activity report in EN, signed presence list, feedback questionnaire in Latvian. Target group: children, their families. D3.3 : New services piloted in Poland [21] Providing narrative therapy (individual and group therapy) during 60-90 days in order to pilot the new method. (two therapists x 15 cases each) + 2 therapy groups (30 hours each ( 36-38 clients). Providing sand therapy during 60-90 days in order to pilot the new method. (two therapists x 15 cases each). (Total = 98) Tangible results: activity report in EN, signed presence list, feedback questionnaire in Polish. Target group: children, their families. D3.4 : Mid-evaluation of services [7] Mid-evaluation of the new services piloted in 3 countries - electronic, in EN. D3.5 : Final evaluation of services [22] Final Evaluation of new services piloted in 3 countries - electronic, in EN. Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) Mid evaluation of services MS2 Mid evaluation of services 3 - FDDS 7 held in 3 countries. Final evaluation of services MS7 Final evaluation of services. 3 - FDDS 22 held in 3 countries. Page 21 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) Final assessment of all project Final assessment of all project MS9 1 - MSAE 24 activities, incl feedback from activities all project members. Page 22 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Work package number 9 WP4 Lead beneficiary 10 1 - MSAE Work package title Therapy platform development Start month 1 End month 23 Objectives The objective of the workpackage is to describe and analyze the current therapies and counselling methods used for handling certain specific cases (“if the child has been involved in X, then the best method would be Y”) accordingly. The online tool will be used by Children´s House team of specialists to empower specialists during the decision making process of using certain therapies in some cases. This tool will be based on existing knowledge and resources of various therapies, which will be analyzed from a comprehensive and child-centered approach. The tool can be used in any EU country. Description of work and role of partners WP4 - Therapy platform development [Months: 1-23] MSAE 1. Different available therapies have been collected and assessed, the best-possible solutions / combination of solutions have been determined and made available at the therapy platform (15). 2. Definition of IT requirements for the development of the therapy platform tool. The IT requirements will be defined to respond to the conceptual requirements defined by the partnership. 3.Technological development of the therapy platform tool. The development will be performed according to the established requirements. 4. Provision of a guide on how to use the tool. In order to make sure that the tool is working correctly each partner will carry out an experimentation use and by any other operator outside the project team that may have the interest in using the tool. 5. After experimentation and evaluation has been finished some recommendations for the tool may be delivered. If there are any improvements needed to be done, they will be incorporated in the tool. Participation per Partner Partner number and short name WP4 effort 1 - MSAE 1.25 Total 1.25 List of deliverables Due Deliverable Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in Number14 months)17 Report on requirements D4.1 (conceptual and IT) for 1 - MSAE Report Public 5 the therapy platform tool Websites, Therapy platform online D4.2 1 - MSAE patents Public 6 tool filling, etc. Guide for the therapy D4.3 1 - MSAE Report Public 13 platform tool Page 23 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 List of deliverables Due Deliverable Deliverable Title Lead beneficiary Type 15 Dissemination level 16 Date (in Number14 months)17 D4.4 Toolkit 1 - MSAE Report Public 23 Description of deliverables 1. Report on requirements (conceptual and IT) for the therapy platform tool (both on paper and pdf-version). Minutes from national and international round-tables (in 3 partner-country languages) 2. Technical solution for therapy platform online tool (web-pages in 3 languages with one host in each country) presented online. 3. Guide to use the therapy platform tool presented online with an online-manual (in 3 partner-country languages and in English). 4. Toolkit. List of mental health service providers for abused children´s mental health care and therapy trainers in all 3 partner-countries available online. Data-collective e-mails from therapists and other mental health workers in 3 countries and minutes and participant lists from meetings online in 3 partner-country languages. Target group for all these deliverables: Project partner organizations and stakeholders, children’s house staff, wider public. D4.1 : Report on requirements (conceptual and IT) for the therapy platform tool [5] Report, in English, Electronic format. Target group: Project partner organisations and stakeholders, children’s house staff (apx 40 people) D4.2 : Therapy platform online tool [6] Online tool will be developed which will be available for specialist after the project ends. Deliverable: tool in English, publicly accessed and free of charge. Therapy platform with all therapies and other mental health services for underage victims in 3 partner countries will be accessible to public. Target group: Project partner organisations and stakeholders, children’s house staff, wider public. D4.3 : Guide for the therapy platform tool [13] A manual made in English and in project partner countries' languages. Target group: Project partner organisations and stakeholders, children’s house staff, wider public. D4.4 : Toolkit [23] Crises counselling service provision principles and protocols with relevant agencies to be developed (English, Estonian, Latvian, Polish), approved by the authorities, made public at relevant websites and ready to be included into the children’s house model post-project. Target group: Project partner organisations and stakeholders, children’s house staff, wider public. Schedule of relevant Milestones Due Milestone Milestone title Lead beneficiary Date (in Means of verification number18 months) End of technical development Technical development ended MS3 1 - MSAE 11 of platform. for therapy platform. Therapy platform´s how-to- MS8 How-to-Guide finished. 1 - MSAE 14 guide is ready. Final assessment of all project Final assessment of all project MS9 1 - MSAE 24 activities, incl feedback from activities all project members. Page 24 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 1.3.4. WT4 List of milestones Due Milestone WP Milestone title Lead beneficiary Date (in Means of verification number18 number9 months)17 Stakeholder meetings 1 First and second stakeholder MS1 WP1 1 - MSAE 9 and 2 meeting held. Mid evaluation of Mid evaluation of services MS2 WP3 3 - FDDS 7 services held in 3 countries. End of technical Technical development ended MS3 development of WP4 1 - MSAE 11 for therapy platform. platform. Mid evaluation of Mid-evaluation of trainings in MS4 WP2 2 - Centrs Dardedze 14 trainings 3 countries. Final evaluation of Final evaluation of joint MS5 WP2 2 - Centrs Dardedze 22 joint trainings. trainings in 3 countries. All stakeholder All stakeholder meetings MS6 WP1 1 - MSAE 22 meetings held. held. Final evaluation of Final evaluation of services MS7 WP3 3 - FDDS 22 services. held in 3 countries. Therapy platform´s how-to- MS8 How-to-Guide finished. WP4 1 - MSAE 14 guide is ready. WP1, Final assessment of all project Final assessment of all WP2, MS9 1 - MSAE 24 activities, incl feedback from project activities WP3, all project members. WP4 Regular partners administrative and financial reports. Electronic reports Administrative and MS10 WP1 1 - MSAE 24 in English covering all financial reports relevant aspects of the project activities during the reporting period. Page 25 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 1.3.5. WT5 Critical Implementation risks and mitigation actions Risk Description of risk WP Number Proposed risk-mitigation measures number Selection of competent project manager The Project management meetings of the steering committee will allow 1 WP1 problems. the contracting entity to provide feedback on the project status. Regular project team meetings and close 2 Communication problems. WP1 teamwork, use of ICT-tools for daily communication Geographical distance Sufficient number of face-to-face meetings. between project partners Use of the contemporary ICT-means for project 3 WP1, WP2, WP3, WP4 makes project management communication (Skype). Project partners have communication difficult. long-term experience in international projects. Insufficient quality of 4 trainings, inadequate training WP2 Selection of professional and experienced trainers. materials Participants not interested to The topics tackled reflect the actual need of the 5 WP2 participate in the trainings. participants. The authorities and network Intensive networking activities and involvement members are not interested of stakeholders to the project delivery process. 6 in introducing the children’s WP2, WP3 Clearly shown benefit of the children’s house house model and prefer the model compared to the institutional model. institutional model. The services provided in the The services chosen are based on the good children’s house do not meet practices from countries where the children’s 7 WP3 the needs and expectations of house model has been implemented. Development the clients. of guidelines. Insufficient quality of the evaluation and assessment 8 WP2, WP3, WP4 Selection of professional and experienced experts. of therapies and counselling methods. Potential risk on the 1. Gantt chart with division of activities and participation of partners deliverables of each organisation by each Project. Centrs Dardedze (Latvia) 2. External audit of these partners' costs. 3. and Poland Empowering 9 WP1, WP2, WP3, WP4 Regular reporting mechanism with the results Children Foundation (PECF) from both projects for comparison. clear and in both projects presented transparent reporting in the narrative and financial under this call: BADEV and reports. PROMISE II. Page 26 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 1.3.6. WT6 Summary of project effort in person-months WP1 WP2 WP3 WP4 Total Person/Months per Participant 1 - MSAE 26.40 12 12 1.25 51.65 2 - Centrs Dardedze 8 12 12 0 32 3 - FDDS 8 12 12 0 32 Total Person/Months 42.40 36 36 1.25 115.65 Page 27 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 1.3.7. WT7 Tentative schedule of project reviews Review Tentative Planned venue Comments, if any number 19 timing of review at the end of the project when submitting the final RV1 24 report, reviews may be envisaged. Page 28 of 28 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 1. Project number The project number has been assigned by the Commission as the unique identifier for your project. It cannot be changed. The project number should appear on each page of the grant agreement preparation documents (part A and part B) to prevent errors during its handling. 2. Project acronym Use the project acronym as given in the submitted proposal. It can generally not be changed. The same acronym should appear on each page of the grant agreement preparation documents (part A and part B) to prevent errors during its handling. 3. Project title Use the title (preferably no longer than 200 characters) as indicated in the submitted proposal. Minor corrections are possible if agreed during the preparation of the grant agreement. 4. Starting date Unless a specific (fixed) starting date is duly justified and agreed upon during the preparation of the Grant Agreement, the project will start on the first day of the month following the entry into force of the Grant Agreement (NB : entry into force = signature by the Commission). Please note that if a fixed starting date is used, you will be required to provide a written justification. 5. Duration Insert the duration of the project in full months. 6. Call (part) identifier The Call (part) identifier is the reference number given in the call or part of the call you were addressing, as indicated in the publication of the call in the Official Journal of the European Union. You have to use the identifier given by the Commission in the letter inviting to prepare the grant agreement. 7. Abstract 8. Project Entry Month The month at which the participant joined the consortium, month 1 marking the start date of the project, and all other start dates being relative to this start date. 9. Work Package number Work package number: WP1, WP2, WP3, ..., WPn 10. Lead beneficiary This must be one of the beneficiaries in the grant (not a third party) - Number of the beneficiary leading the work in this work package 11. Person-months per work package The total number of person-months allocated to each work package. 12. Start month Relative start date for the work in the specific work packages, month 1 marking the start date of the project, and all other start dates being relative to this start date. 13. End month Relative end date, month 1 marking the start date of the project, and all end dates being relative to this start date. 14. Deliverable number Deliverable numbers: D1 - Dn 15. Type Please indicate the type of the deliverable using one of the following codes: R Document, report DEM Demonstrator, pilot, prototype DEC Websites, patent fillings, videos, etc. OTHER ETHICS Ethics requirement ORDP Open Research Data Pilot 16. Dissemination level Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Please indicate the dissemination level using one of the following codes: PU Public CO Confidential, only for members of the consortium (including the Commission Services) EU-RES Classified Information: RESTREINT UE (Commission Decision 2005/444/EC) EU-CON Classified Information: CONFIDENTIEL UE (Commission Decision 2005/444/EC) EU-SEC Classified Information: SECRET UE (Commission Decision 2005/444/EC) 17. Delivery date for Deliverable Month in which the deliverables will be available, month 1 marking the start date of the project, and all delivery dates being relative to this start date. 18. Milestone number Milestone number:MS1, MS2, ..., MSn 19. Review number Review number: RV1, RV2, ..., RVn 20. Installation Number Number progressively the installations of a same infrastructure. An installation is a part of an infrastructure that could be used independently from the rest. 21. Installation country Code of the country where the installation is located or IO if the access provider (the beneficiary or linked third party) is an international organization, an ERIC or a similar legal entity. 22. Type of access VA if virtual access, TA-uc if trans-national access with access costs declared on the basis of unit cost, TA-ac if trans-national access with access costs declared as actual costs, and TA-cb if trans-national access with access costs declared as a combination of actual costs and costs on the basis of unit cost. 23. Access costs Cost of the access provided under the project. For virtual access fill only the second column. For trans-national access fill one of the two columns or both according to the way access costs are declared. Trans-national access costs on the basis of unit cost will result from the unit cost by the quantity of access to be provided. Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Part B Contents 1. Definition of the problem, needs assessment and objectives of the project ...................................... 2 2. Relevance and justification ............................................................................................................... 7 3. Expected results ............................................................................................................................... 8 4. European added value ...................................................................................................................... 9 5. Methodology ................................................................................................................................... 10 6. Timeline by work package............................................................................................................... 11 7. The partnership and the core project team ..................................................................................... 12 8. Subcontracting ................................................................................................................................ 13 9. Monitoring of the project implementation; risks and measures to mitigate them ............................. 13 10. Evaluation of the project activities, deliverables and results ......................................................... 14 11. Dissemination strategy and communication tools ......................................................................... 15 12. Sustainability and long-term impact of the project results ............................................................. 16 13. Ethical issues related to the project .............................................................................................. 16 14. Mainstreaming .............................................................................................................................. 17 15. Description of child protection policy ............................................................................................. 18 16. English translation of the abstract ................................................................................................. 19 1 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 1. Definition of the problem, needs assessment and objectives of the project What are the problems and/or the current situation? Which are the needs that the project aims to address? In relation to these problems and needs, what are the major objectives that the project should attain? Who are the target group(s) of your activities and why were they chosen? Note: You are expected to provide here a needs assessment for your proposed activities. Such needs assessment should include relevant and reliable data and should contain a robust analysis clearly demonstrating the need for the action. The applicant can refer to existing research, studies, previous projects which had already identified the need. The needs assessment must make it clear to what extent the action will meet the need and this shall be quantified. You are requested to be specific and focus on the actual needs that your project will aim to address and not limit the analysis to general statements and information about the problems and needs of the target group in general. Needs assessment Violence is a grave social problem that has to be fought with at all levels. The negative effects and outcomes of violence towards individual victims and their close ones sum up in the societal level – lower life quality, decreased employability, increased treatment costs etc. Research has shown that violence is regenerative – children who have fallen themselves as victims of violence or witness violent acts are themselves more likely to be involved in violent activities in their adulthood compared to children having not such a negative experience. Therefore violence in the context of children must be paid special attention to. Abuse of children can be divided as follows: - Emotional abuse that is causing an emotional state of stress for the child, which can cause serious or irreversible damage to a child's emotional development. Emotional abuse is the treatment of the child as worthless, inadequate, unloved and unneeded. - Physical abuse that is deliberate, non-accidental use of physical force by the parent or a caretaker of a child, which can injure the child. Physical abuse can cause a child lighter, heavier, or even life threatening physical and psychological damage. Physical abuse-related activities are as follows: - Sexual abuse or the involvement of a child in sexual activity the content of which he or she does not fully understand, to which he or she is not able to give informed consent, and that violates the laws or social norms of society. Sexual violence against children is a contact or noncontact activity with sexual need, committed for the purpose of satisfaction of power, sexual or any other needs by an adult or another child, who by age or level of development is in a responsible, trust or power relationship with the child. - Child neglect or non-fulfilment of obligations by a parent or a guardian in taking care of the child's physical, mental, emotional and social development and that may harm the child's age-appropriate development and mental and physical health - Corporal punishment of the child or violence, which is defined as the penalty with the use of physical force and which is intended to cause pain or discomfort (even a light one) to the child. The most acute form of abuse of children to be fought against is, of course, sexual abuse that takes place in many forms. Most prevalent is abuse by a relative or acquaintance, but it can also take the form of trafficking for sexual exploitation, pornography (including online pornography) and sexual abuse by clergy and other authority figures. Most studies show females report more abusive experiences than males. Global / regional prevalence of child sexual abuse A number of studies have reviewed prevalence rates and suggested global or regional prevalence estimates. For example, Finkelhor (1994) found that epidemiological studies in 19 countries produced findings similar to North American research (incidence rates ranging from 7% to 36% for women and 3% to 29% for men). Lampe (2002) reviewed 24 European studies conducted in Germany, Switzerland, Great Britain, France, Sweden, Austria, Belgium, Denmark, Finland, the Netherlands and Spain and found overall prevalence rates of 6% to 36% in girls and 1% to 15% in boys under the age of 16. May-Chahal and Herczog (2003) 2 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 examined a number of European prevalence studies and reported rates of rape were 0.9% for females and 0.6% for males. When broader definitions of child sexual abuse are used, the rates were 50% for females and 25% for males. The UN World Report on Violence Against Children reports a World Health Organization (WHO) estimate that 150 million girls and 73 million boys under 18 experienced forced sexual intercourse or other forms of sexual violence during 2002 (Ezzati et al., 2004, cited in Pinheiro, 2006). Sexual violence predominantly affected those who had reached puberty or adolescence, and girls were at greater risk of sexual violence than boys. Pereda et al. (2009) conducted a meta-analysis of 65 child sexual abuse prevalence studies from 22 countries. The analysis showed that 7.9% of men (7.4% without outliers) and 19.7% of women (19.2% without outliers) had suffered some form of sexual abuse prior to the age of 18. (Lalor & McElvaney 2010, 26). Mossige, Ainsaar and Svedin (2007) compare findings from the Baltic Sea regional study on adolescents’ sexuality. Approximately 20 000 young people around age 18 participated. The child sexual abuse element of the study compares data from respondents in Norway, Sweden, Lithuania, Estonia and Poland (n= 11 528). Swedish females report high levels of indecent exposure (27%) and indecent touch (56%), relative to neighbouring countries. Experiences of unwanted sexual intercourse among females range from 7% (Estonia) to 13.3% (Lithuania). Overall, this large sample of Baltic youth report that 10% have had unwanted sexual intercourse, 37% have experienced indecent touch and 21.9% report having experienced indecent exposure. Mossige et al. note that these rates are higher than most international studies citing the inclusion of peer abuse as a possible explanatory factor. The higher prevalence rates in men noted in Poland were also found in Sesar et al.’s study in Bosnia and Herzegovina. (Lalor & McElvaney 2010, 26). These studies clearly indicate that especially sexual abuse of children is wide-spread across Europe. Several efforts with remarkable success have been made to combat this phenomenon, but children are less likely to report or inform adults or authorities about violent acts committed against them compared to grown-ups. The reasons for that are different: shame, lack of knowledge what and how to do – but also the complexity of the process. If a violent act against a child has occurred, the investigation could involve police, doctors, psychologists and other specialists, each working in a separate agency / institution that deals with a specific aspect in the case. The process could be often long, cumbersome and even traumatizing to the child victims. This means that too often the cases of violence and abuse go unnoticed and the perpetrator remains free. As pointed out, it is not only shame or lack of knowledge that prevents child victims from looking for help. It is also the complicated system and procedures they have to go through. In other words, the system has been developed from the institutionalized and authority based approach and does not necessarily put the issues of child protection and ensuring the rights of the child at its centre. The current system does not always sufficiently consider “the best interest of the child” and tends to focus primarily at judicial issues while leaving the specific child-related aspects (providing psychological counselling, ensuring physical and mental safety, preventing reoffending etc) to the background. So despite all the efforts made, the system handling cases with child victims of violence is not sufficiently effective or efficient and yields only partial results. An alternative to the current solution would be to develop a system where cases involving child victims of violence are treated at one place – the so-called children’s house or Barnahus model. The model puts the rights and interests of the child at its centre and provides integrated and multidisciplinary support that focuses specifically at better reporting, investigation, treatment, follow-up and judicial involvement in cases of violence against children. It means that cases involving child victims of violence are treated at the same place avoiding duplication and traumatizing the children as much as possible. In practical terms the children’s house model combines the judicial activities (i.e. investigating the case and conducting relevant medical examinations and interviews) with activities aimed at improving the psychosocial wellbeing of the child and the family (victim therapy, counselling, family counselling, other relevant therapies etc). The children’s house also works as a networking centre to include, if necessary, other relevant professionals in the area and acts as a competence centre for developing new services and therapy delivery models. In other words, the children’s house is a “one stop shop” for providing services and counselling in cases that involve child victims of violence. This has resulted in the children’s house model 3 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 becoming increasingly popular in Europe due to the enhanced quality of services provided. For example, the Icelandic case shows that significant improvement has been made in terms of quality of the procedure: efficient, professional and child friendly response is offered, appropriate therapeutic interventions are available for child victims, re-victimization has been minimized, different agencies trust each other and work for the common goal and the public is well-aware of the services provided and has confidence in their delivery. The project partner countries have made considerable progress in terms of ensuring high level of child protection and providing a comprehensive mix of services to prevent violence targeted at children, detecting it as early as possible, to provide necessary therapy and counselling services to children who have fallen victim to violence and – needless to say – to punish the perpetrators. In line with the principles for integrated child protection systems (http://ec.europa.eu/justice/fundamentalrights/ files/rights_child/10_principles_for_integrated_child_protection_systems.pdf), the efforts have concentrated to setting up easy to access and professional reporting and counselling systems (116 111 helpline, chat and Skype counselling), enhancing the scope of counselling services and guaranteeing the competence and capacity of specialists working with children, information dissemination among the wider public on zero tolerance against violence targeted at children and possibilities to find assistance combined with networking building activities both at national and international level to ensure that all cases receive due attention. These efforts have received due attention also at international scale. Estonia was awarded the 2016 annual prize by United Nations partner organisation International Federation for Family Development to recognize the Estonian commitment to improve the well-being of children and families. A special notification was made concerning the importance Estonia has attached to children’s rights in its legal acts. Latvia is distinguished as a country where free state-guaranteed rehabilitation services in cases of violence are provided to all children regardless of whether the particular offence has led to initiation and conclusion of criminal proceedings or not. The number of children receiving these services is increasing annually. Despite these positive developments it has become clear in all project partner countries that the next logical step in combating violence targeted at children is to focus more at specific ways of service delivery or concentrate the services to “one stop”, i.e. to introduce the children’s house model. The three countries agree upon the need to introduce the new service model, but the progress they have made in implementing the plan varies. In Estonia the decision for launching the children’s house / Barnahus model has been taken at state level and piloting will commence in 2017. In Latvia relevant discussions have been initialized, but no schedule has been agreed upon. In Poland no state-level decision has been made to launch children’s houses, so initiatives from local governments and civil society organisations will take place instead. The specific situation and the particular needs of each country are described below. In Estonia the issues related to children’s rights and child protection has been on the top of the country’s political agenda in recent years (see for example the priorities during Estonian presidency of The Council of The Baltic Sea States (CBSS) 2014-2015, http://www.cbss.org/council/cbss-presidencies/cbssestonian- presidency-2014-2015/). This has led to numerous initiatives and interventions aimed at promoting children’s rights, ensuring that each child in need receives due help and attention and paving way for the establishment of children’s houses in Estonia. For example, child abuse diagnostics system has been developed and put into effect, an interagency network (consisting of districts prosecutors, district heads of Police Child Protection Units, medical experts, Ombudsman for Children representatives of Ministry of Justice, Ministry of Interior, Ministry of Social Affairs, Social Insurance Board Child Protection Unit and Victim Support Unit, local government specialists, NGO representatives etc) for enhancing cooperation has been established and 4 regional Children Mental Health Centres set up. Also a network of different specialists necessary for the establishment of children’s houses has been created, preliminary trainings conducted and some information materials developed. Of particular importance in the context of the current call is the PROMISE initiative launched under the auspices of CBSS (http://www.childcentre.info/promise/) that acts “the agent of change by mobilizing national and local agencies, governmental and non-governmental, towards establishing Barnahus and child-friendly 4 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 centres” in Europe. It triggered a decision in December 2014 to establish two children’s houses in Estonia as of January 2017, based on the developed Children Mental Health Centres and involving the interagency network as cooperation partners and trained specialists as staff. However, several factors hamper the successful implementation of the children’s house model in Estonia, which PROMISE I and II and other previous projects didn´t explore: - Limited capacity of staff to handle specific cases (children with special needs) and lack of “how to” guidelines - Low level of knowledge about the model outside the established partnership and especially among the wider public - Limited integration of the model with other available services, especially the 116 111 e- and phone-based counselling - Insufficient availability of various high-quality intervention and counselling tools and methods used in the children’s houses In Latvia the issues of protecting children’s rights and improving the safety and well-being of child victims have received focused attention during the last years as according to official statistics the number of crimes committed against children (including sexual abuse cases) has increased by more than 30%. This evoked specific intervention from the National Expert`s Council (a body consisting of representatives from Ministry of Welfare, Ministry of Justice, Ministry of Health, Ministry of Interior, General Prosecutor`s Office, State Police, Forensic Medicine experts, The Latvian Association of Local and Regional Governments and State Inspectorate of Children`s Rights) that analysed in depth the situation in Latvia and identified a clear mismatch between the legislation and strategies with everyday practice. The Latvian Ombudsman`s office also analysed the process and practice of interviewing child victims of sexual abuse / offences. It reached the conclusion that despite legal requirements such interviews are not conducted by professionals with specific skills, the interviews usually take place in investigator`s office and video recording is not used. These results led to amending certain legal acts (including the Criminal Proceeding Law) to enforce more child-friendly approach to the process and ensure the proper implementation of the principles of child friendly justice. Combined with the PROMISE initiative (see above) the Expert`s Council recommended Children’s House model as a comprehensive solution. In summer 2016 the model was introduced to the Latvian Crime Prevention Council (CPC) where the approach was approved and the decision was taken for the Children’s House model to be piloted in Riga / Riga region for a year and based on the experience gained; develop a plan and methodology for introducing the model across Latvia. However, the piloting has been delayed as the Parliament did not allocate funds for the 2017 budget. Summing it up, there is a lack of “child victim rights centred” approach in Latvian criminal proceedings the specific knowledge of experts how to handle such cases is low and the wider public is not informed about the pros of the children’s house model, expressed through: - Lack of specialization while investigating sexual offences - Lack of child-centred approach while interviewing child victims (interviews are often delayed, children are not interviewed in child friendly environment and by trained professionals, additional evidence that rarely actually exist in sexual abuse cases - forensic medicine, psychologist expert opinion, other witness statements - is required in the court etc). - Lack of child-friendly approach and cooperation as victims are often interviewed several times by different institutions (Police, Social service, Custody court, psychologists etc) and not in a logical correlation with other interventions (e.g. rehabilitation services prior to interviewing). - Low level of awareness among the Latvian professionals and wider public of the Children’s house model, its benefits and the underlying principles - Limited capacity of the justice system representatives and child welfare workers to bring along the needed changes as they have not been trained to introduce and implement the new model - No systemic approach or guidelines for therapeutic methods used in working with children and In Poland, recent research has indicated that there are still many cases where children rights in criminal cases related to violence are not respected, despite the grim statistics that show 7 out of 10 children under 17 years old experiencing at least some form of violence, of which 12, 4 % counts for sexual abuse. 5 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 In order to improve the situation, the regulations in the Code of criminal procedure have been adjusted and improved concerning child-friendly hearings. A child under 15 years of age who was a victim of, or witness to, domestic or sexual abuse should only be heard once in criminal proceedings and in the presence of a psychologist Since July 2015, child hearing is obligatorily conducted in an appropriately prepared room, which in practice are called Friendly Rooms of Child Hearing. The main problems the Polish society continuously faces are: - Poland does not have a coherent, centrally-coordinated and comprehensive child protection system. To an extent, it is possible to reconstruct the child protection system by extracting protection-oriented child-related elements from other systems, such as the system of alternative care, social assistance, healthcare, education, and system of combating domestic violence which has a crucial importance regarding child protection. The system thus obtained proves fragmentary and “derivative” in character and the absence of a central coordinating body is visible. In other words, the “child protection system” in Poland will in fact be a combination of elements from various sub- or related systems. It makes the inter-agency and interdisciplinary cooperation in cases of child abuse and neglect very difficult. - In Poland there is no specialized institution responsible for helping children victims of abuse working with holistic approach. There are no regulations providing free of charge and professional comprehensive assistance for children victims of abuse and their families including psychological, medical and legal services. Activities undertaken in this field are implemented mainly by nongovernmental organizations and by Crisis Centers. Although no state-level decision has been made in Poland to launch children’s houses, initiatives from local governments (Warsaw, Starograd) and civil society organisations (Empowering Children Foundation) have led to the opening of two Child Advocacy Centres in 2017 and two more (in other locations) in 2018. These centres will closely follow the children’s house approach in its everyday activities. To sum it up, all project partner countries have made considerable progress in ensuring the rights of child and tackling violence targeted at children. However, the current institution-based approach has reached its limits and the fragmentation it contains hampers the further development of services aimed at decreasing violence against children at all levels. The momentum gained should not be lost and new and improved child-centred service delivery model and approach for handling child victims of violence – the children’s house model – has to be introduced and implemented in the three participating countries. The needs assessment concerning the project partner countries enables to identify five common problems related to ensuring children’s rights and tackling violence targeted at children: 1. Lack of one-stop-shop children’s house model for providing services for the child-victims of violence 2. Lack of knowledge and skills at various levels (national administrative level, experts, network members etc) for setting up and implementing children’s houses 3. The children’s house workers and network members lack certain skills needed for effective service provision in the children’s house (interviewing skills, skills for handling children with special needs etc) 4. Cooperation between relevant specialists is still low at national level (resulting in sustaining the traditional institution-based model) and even lower at international level (although cases involving violence towards children have become increasingly cross-border). 5. The services provided to child victims of violence in the project partner countries have not been analysed for their effectiveness and often rely on the expert opinion of a small circle of experts. Objectives: The overall objective of the project is to contribute to the development of integrated child protection systems and enhanced possibilities to child victims of violence by providing multidisciplinary child-centred approaches in the project partner countries. The specific objectives of the project are • To develop children’s house models in project partner countries fitting to national context. • To improve knowledge and exchange good practices in partner countries for setting up and 6 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 developing the children’s house model (including the relevant know-how from countries where the model is already in use) fitting to the national context • To enhance the capacity of children’s house workers and network members to handle cases involving child victims of violence (including those with special needs) both effectively and efficiently • To widen cooperation and networking between relevant specialists (children’s house workers, police officers etc) at national and international level • To ensure that only evidence-based service delivery models and methods are used in children’s houses and to analyse and evaluate the interventions in use. 2. Relevance and justification How does your project address the call priority under which you are applying? What is the project's contribution in this area? What are the innovative aspects of the project? The proposed project addresses directly the call and its priority of ensuring a child-friendly response to violence against children that is interagency, multidisciplinary and comprehensive (the children’s house model). As described above, two project partner countries have already decided to introduce the model, but the progress they have made in its implementation varies just like the range of services offered. The third partner has witnessed some setbacks in introducing the children’s house approach, but the attitude towards its implementation is positive. The proposed project takes both these aspects into consideration and includes therefore activities / results common to all countries as well as country-specific ones to fit the national context. The current call provides a perfect possibility for the countries for mutual learning and exchange of good practices (between each other and from countries having already successfully piloted the children’s house model) for adapting the principles into national context, capacity building of professionals working in children’s houses / related networks, establishing and widening co-operation and collaboration between different national agencies as well as to foster the activities of already established international networks. In particular, the project addresses the call priority through: 1. Piloting new services in children’s houses in Estonia and Poland and creating the necessary preconditions for launching the houses in Latvia 2. Enhancing the professional capacity of children’s house workers and network members, including disseminating information about the role and possibilities the model contains 3. Developing national networks between different agencies (police, prosecutors, judges, social workers, child protection authorities, health, mental health and education services) to drop the institutional model and to move towards the children’s house service delivery approach. All these activities will be based on cooperation and sharing of good practices between project partners. Additionally, the proposed project contributes to the following innovative aspects that have insofar received only limited attention: 1. International network development. Cases involving violence towards children have become increasingly cross-border (ranging from Internet-based violence to marriages between persons from different countries). The issue of trafficking child victims has become a major topic to be tackled (see https://issuu.com/philipishola/docs/guidelines_-_promoting_the_human_ri). 2. Therapy platform development. Although numerous therapies and counselling methods are used in the process, the vast majority of them have not passed relevant checks concerning them being evidence-based and / or effective. In the proposed project the used methods from all participating countries will be collected, analysed, evaluated and made available (in all relevant languages: Estonian, Latvian, Polish and English) to the project partners. Firstly, this will improve the quality of service delivery and secondly, it will help to establish a modus operandi for handling certain specific cases (“if the child has been involved in X, then the best method would be Y”). 3. Including 116 111 helpline (including chat and Skype) counsellors into the children’s house 7 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 service delivery model. In case the 116 111 counsellor receives a contact that requires the intervention from the children’s house team, he will carry out the preliminary interview according to the children’s house model regulations and requirements. 3. Expected results What are the expected results of the project? Who will benefit from these results and how? How will the target groups of the project benefit concretely from the project results and what shall change for them? How will these results contribute to achieving the objectives of the call priority under which you are applying? Note: Results are immediate changes that arise for the target groups after the completion of the project (e.g. improved knowledge, increased awareness). Results must be distinguished from deliverables, which are produced with the resources allocated to the project, e.g. training courses, conferences, leaflets. The following table reflects the expected results, who will benefit from them and how. Project result Target group benefiting How will it benefit from results / what will change Improved knowledge and Authorities, policy and The proposed project will use the exchanged good practices in decision makers, children’s available knowledge (academic partner countries for setting up house workers and network research, strategies and policy and developing the children’s members (police, documents) and good practices house model (including the prosecutors, judges, social (from each other, other countries relevant know-how from countries workers, child protection where the model is in use etc) where the model is already in use) authorities, health and considering the national context fitting to the national context education services etc). to develop children’s house Children fallen victim to model. In Estonia and Poland it violence means piloting new services in children’s houses, in Latvia a roadmap for setting up children’s house will be developed Enhanced capacity of children’s Children’s house workers The target group members will house workers and network and network members pass different trainings involving members to handle cases Children fallen victim to national and international involving child victims of violence violence trainers covering a wide range of (including those with special relevant aspects. Guidelines for needs) both effectively and handling specific types of cases efficiently will be developed. Relevant professionals are ready and capable of providing relevant services to child victims of violence (including children with special needs, such as disabled and migrant children Widened cooperation and Children’s house workers The different information networking between relevant and network members. activities foreseen in the specialists (children’s house Wider public. Children fallen dissemination strategy (local and workers, police, prosecutors, victim to violence international events, information judges, social workers, child campaigns, trainings, guideline protection authorities, health and development, networking with education services etc) at national policy and decision makers at all 8 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 and international level, increased levels etc) will reach stakeholders awareness about the service in each country. The networking delivery model in the public. will strengthen the position and role of the children’s houses in society and serve as a basis for further inclusion of additional services to the model. Only evidence-based service Children’s house workers The services provided in the delivery models are used in and network members. children’s house are effective to children’s houses and the Wider public. Children fallen help the child and his close ones interventions in use have been victim to violence. and resource efficient in terms of analysed and evaluated. time and money allocated. The therapy platform contains evidence based best practices and possible solutions / combination of solutions for handling specific types of cases. Summing up, children’s house workers and network members will be the direct beneficiaries of the project. Through their increased knowledge, skills and capacity they will be able to carry out their tasks more effectively and efficiently. The trainings will contribute directly to this issue; the training materials developed will serve as auxiliary material after the project has been completed. The improved cooperation nationwide will ensure that no cases will be left “unhandled”. The international co-operation will guarantee that the phenomenon of “rapidly closing-in Europe” will be adequately addressed. On an impact level the project helps to guarantee that children who have fallen victim to violence receive adequate support at “one stop” basis by the professional specialists. This will help to curb the reoccurrence of violence and violent acts of the children in their adulthood. 4. European added value What is the project's added value at European level? How will you ensure that the project methodology and/or deliverables and/or results will be transferable at European level? Note: European added value of actions, including that of small-scale and national actions, shall be assessed in the light of criteria such as their contribution to the consistent and coherent implementation of Union law, and to wide public awareness about the rights deriving from it, their potential to develop mutual trust among Member States and to improve cross-border cooperation, their transnational impact, their contribution to the elaboration and dissemination of best practices or their potential to contribute to the creation of minimum standards, practical tools and solutions that address cross-border or Union-wide challenges. Although the conception of children’s house has received positive feedback from in different EU MS, it is largely still a limited solution been put into practice only in 3 MS. The theoretical justification for establishing centres with such focus and modus operandi is widely acknowledged (see Rasmusson, B. Child Ind Res (2011) 4: 301). The practical piloting in Sweden, Denmark and Croatia has yielded positive outcomes (Svedin, C G., & Landberg, A. https://calio.dspacedirect.org/handle/11212/2186, http://www.tandfonline.com/action/showCitFormats?doi=10.1080%2F14043858.2012.739323). The model needs wide-scale piloting under different circumstances and situations: differences in public sector organisation, politics, legal systems, culture etc must all be taken into consideration before putting forward a pan-European comprehensive approach. The European added value will be achieved at two levels: • Project level. The partnership established to implement the project covers different competencies, experiences and backgrounds etc., all operating in the same field within the overall EU regulative 9 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 and operational framework. This means that the project outputs training materials, trainings, exchanges of best-experience, etc. will be composed and delivered from an EU perspective, reflecting the differences and similarities of the different countries. •Impact level. The project outputs can be multiplied to any other EU member state according to their maturity level. The nationwide co-operation model developed can serve as a basis for setting up a similar system in any other countries. The PROMISE initiative (see above) gives a good example of how different countries across the Baltic Sea have worked together in a single framework to reach a common goal. The project also helps to achieve EU and national policies focused on improving the rights and ensuring the well-being of children through developing new models of intervention and ensuring the high quality of services provided. 5. Methodology Outline the approach and methodology. Explain why this is the best approach to attain the objectives and the proposed results. Explain the structure and complementarity of the work packages. The proposed project is divided into 4 complementary workpackages (WP): 1. Management and coordination. The objective of the WP is to ensure the smooth and effective management of the project, achieving all objectives and results in time and with agreed-upon quality criteria. 2. Capacity rising, network development and sustainability. The objective of the WP is to ensure that the children’s house workers and network members have the full capacity to provide various therapies and interventions effectively and efficiently and to guarantee that all relevant stakeholders and wider public are aware of the role and possibilities children’s house has in the society. 3. Enhancing the service delivery in children's houses fitting the national context of project partner countries. The objective of the WP is to enhance the services offered in children’s houses in Estonia and Poland and create the preconditions and readiness in Latvia to pilot the model postproject. Enhancing service delivery´s main goal and impact is the analysis of piloting new services for the vulnerable target group of traumatized children and their parents. Assessment gives information about target group´s willingness of using group-therapy, individual therapy for parents and e-counselling as new forms of counselling. F.e. in Estonia, National Victim Support Service is available for victims of sexual abuse, but without cost-effectiveness analysis no new services are added. 4. Therapy platform development. The objective of the WP is to map the current therapies and counselling methods used and to establish a modus operandi for handling certain specific cases (“if the child has been involved in X, then the best method would be Y”) accordingly. The WP help to achieve the overall objective of the project by focusing at complementary aspects necessary for that. The increased knowledge, skills and capacity of children’ house workers and network members will be achieved through training, guideline development and exchange of best-practices. The networking activities and information dissemination will ensure that relevant cases will be tackled at children’s house, making the investigation of the case as smooth and convenient for the child victim as possible. The interventions, therapies and counselling methods used are evidence-based, evaluated and adequate for solving specific cases. The approach and methodology used in each WP is as follows: 1. Strategic planning or the principles of Deming circle known as PDCA (Plan-Do-Check-Adjust) will be used. A state of play, highlighting the main problems and areas of improvement and intervention will be compiled (Plan). Then a set of actions to overcome the identified obstacles will be implemented (Do), followed by internal and external assessment (Check) and recommendations for further action (Adjust). This wholesome approach ensures the most 10 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 effective and efficient way of solving the problems and achieving the planned results. Project cycle management (PCM) will be used as a method for achieving the objectives and results of the project. Following the principles of PCM ensures that resources are used effectively and efficiently to achieve the pre-determined objectives and results. Using PCM means that the set goals are clear and measurable, the use of resources co-ordinated, risks properly identified and managed etc Another important aspect is that PCM requires the active participation of key stakeholders and aims to promote local ownership. 2. Training. Based on the developed syllabus relevant trainings will be conducted. Kirkpatrick’s model will be used to assess the effectiveness and efficiency of the trainings. 3. The proposed project will use the available knowledge (academic research, strategies and policy documents) and good practices (each other, other countries where the model is in use etc) considering the national context to develop children’s house model. In Estonia and Poland the WP will focus at actual delivery of services to children who have fallen victim to violence in the children’s house. The pilot phase will focus at providing family therapy, group counselling, individual face-to-face counselling in the children’s house and integrating phone / e- counselling (116 111 service) into the system. In Latvia a roadmap for setting up children’s house will be developed to be able to provide a wide range of high quality services when the children’s house will be piloted. 4. Desk-based research and focus-group interviews with stakeholders will be used as the main methods to analyse and evaluate the current therapies and counselling methods used. Known evaluation methods (see for example https://www.childwelfare.gov/topics/systemwide/assessment/family-assess/safety/ or http://eryica.org/sites/default/files/EURYICA_v2_page%20by%20page_0.pdf) will be used. Throughout the project the Lundy model of child participation will be used as much as applicable 6. Timeline by work package Provide in a structured manner the timing of the activities per Work package by using, for instance, a Gantt chart. YEAR 1 YEAR 2 Workpackage 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Administrative and x x x x x x x x x x x x x x x x x x x x x x x x financial management Information x x x x x x x x x x x x x x x x x x x x x x x x dissemination activities Local stakeholder x x x x meetings Workpackage 2. Join training plan/ X syllabus development Trainings in Estonia x x x x x x x x x x x x x x x x x x Training in Latvia x x x x x x x x x x x x x x x x x x Trainings in Poland x x x x x x x x x x x x x x x x x X Joint trainings x x x x Guideline and x x x x x x x x x x x x x x x x x x information material development Workpackage 3. Piloting the service x x x x x x x x x x x x x x x x X in Estonia Piloting the service x x x x x x x x x x x x x x x x x in Latvia 11 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Piloting the service x x x x x x x x x x x x x x x x X in Poland Assessing the x x x service delivery Workpackage 4. Collecting and x x x x assessing therapies Defining IT X requirements Technological x x x x x platform development “How to” guide x x x development Fine-tuning the x x x guide 7. The partnership and the core project team Describe the partnership of organisations implementing the project (applicant, partners). Explain how the partners were selected, and why is this partnership the best to attain the objectives of the project. Describe the value of the partnership, its strengths/weaknesses, the organisational arrangements within the partnership and how you will ensure coordination within the partnership. Introduce the persons of the core project team and list the CVs (to be attached to the application) of the key people working in the project (project manager, financial manager and the key experts). The partnership consists of the following organisations: • Estonian Ministry of Social Affairs is the coordinator organisation and the national authority responsible for child protection policy development in Estonia. It also finances and coordinates the nationwide 116 000 and 116 111 helplines and the national development of children´s houses across Estonia. • NGO Dardedze. NGO Dardedze has more than 15 years of experience in working with child abuse cases in therapy and almost 10 year experience in child friendly interviewing. Dardezde will be the coordinating institution and the actual environment of Children`s house in Latvia once the model will be piloted. • Poland Empowering Children Foundation (PECF) has been active since 1991. The mission of the NGO is to work towards making sure that all Children have a safe childhood and are treated with respect for their dignity, as full-fledged human beings. The NGO aims to protect Children from abuse and help those who have experienced violence to help them know their rights, believe in themselves, and enjoy their lives through offering psychological and legal help to abused children and their caregivers, teaching children how to avoid violence and abuse, teaching adults how to treat children and how to protect them from abuse, telling adults what to do when they suspect a child might have been abused and influencing the Polish law to ensure the best possible protection of children’s interests. The partnership is built upon the previous good cooperation within the PROMISE project. The partnership also reflects the differences in the state of play regarding the implementation of children’s house model. For the smooth and effective management a project steering committee (SC) will be set up, consisting of all partner organisations. SC will monitor the implementation of the project and will take strategic decisions concerning the project. The SC will be chaired by the applicant, who also will be responsible for preparation and minutes. SC-meetings will take place 6 times during project. The meetings will be organised in different project partner countries Additional meetings are to be called for if necessary. Invitations to corresponding meetings are to be sent within a 3 weeks’ notice. Agenda with underlying documents will be sent 1 week in advance. For the operational management the applicant will appoint a project manager and a financial manager, who will be responsible for the overall administrative and financial management of the project, including reporting to the financing agency. For each WP, a WP leader will be appointed by responsible partner. For internal communication email, phone and Skype will be used. Project documents will be stored in a knowledge management platform accessed through internet by password. 12 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 The core project team (see attached CVs) consists of: • Project coordinator Ann Lind-Liiberg (MoSA) • Financial managers Ester Timmas, Pille Erm, Diana Kalvik (MoSA) • Laura Celmale National coordinator (Dardedze) • Zaiga Lasmane Project assistant (Dardedze) • Liga Dolace Project accountant (Dardedze) Beata Wojtkowska National coordinator (PECF) • Ewa Dawidczyk project assistant (PECF) • Małgorzata Jabłonowska-Zagrajek (PECF) Also practical experts Anda Avena, Laila Balode, Daina Dziluma, Liga Redliha, Juta Bumbiere, Magdalena Zawadzka, Alicija Budzynska, Krystyna Nazwisko, Krzysztof Sarzala, Justyna Podlewska, Marta Magdalena Skierkowska, Joanna Marszal-Kotas. 8. Subcontracting If applicable, explain the reasons for any subcontracting in your project. The following activities will be subcontracted: 1. Trainings in Estonia, Latvia and Poland. 2. Some information and media activities. 3. Final conference organisation. 4. Development of therapy platforms (ICT development) None of the project partner organisations have the necessary competence or skills to carry out the tasks. While subcontracting the principle of “best value for money” will be followed and competitive bids taken according to the regulations set out in the Guidelines and grant agreement. 9. Monitoring of the project implementation; risks and measures to mitigate them How will you ensure that the project is implemented as planned and what methods will you use to monitor its progress? What are the potential risks and what action do you plan to undertake to mitigate them? Deming’s Wheel” (PDCA) and Project Cycle Management (PCM) are used to implement the project. This ensures clear co-ordination and management of the activities and clear procedures for reporting. The trainings will be evaluated using the Kirkpatrick’s model. The evaluation focuses at four stages: reaction of the participants, improvement of skills and knowledge, change in behaviour, tangible results of the training. RISK MITIGATION Project management problems Selection of competent project manager The meetings of the steering committee will allow the contracting entity to provide feedback on the project status Communication problems Regular project team meetings and close teamwork; use of ICT-tools for daily communication. Geographical distance between project Sufficient number of face-to-face meetings. partners makes project management Use of the contemporary ICT-means for communication difficult project communication (Skype). Project partners have long-term experience in international projects. 13 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Insufficient quality of trainings, inadequate Selection of professional and experienced training materials trainers. Participants not interested to participate in The topics tackled reflect the actual need of the trainings the participants. The authorities and Network members are Intensive networking activities and not interested in involvement of stakeholders to the project introducing the children’s house model and delivery process. Clearly shown prefer the institutional model. benefit of the children’s house model compared to the institutional model. As Project´s leading coordinator after introducing the proposal first changed and is now Ministry of Social Affairs, Governmental organisation responsible for coordinating children´s houses in Estonia, it improves contact with governments in other two member countries and definitely decreases this risk in Estonia. Co-work with prosecutors, judges and other law- enforcement officers also definitely decrease this risk. The services provided in the children’s The services chosen are based on the good house do not meet the needs and practices from countries where the children’s expectations of the clients. house model has been implemented. Youth participation in service design. Insufficient quality of the evaluation and Participation of high-level specialists. assessment of therapies and counselling methods. Potential risk on the participation of partners 1. Gantt chart with division of activities and Centrs Dardedze (Latvia) and Poland deliverables of each organisation by each Empowering Children Foundation (PECF) in Project. both projects presented under this call, 2. External audit of these partners' costs. BADEV and PROMISE II. 3. Regular reporting mechanism with the results from both projects for comparison. clear and transparent reporting in the narrative and financial reports. 10. Evaluation of the project activities, deliverables and results How will the project activities, the deliverables and the results be evaluated, and by whom? Explain which quantitative and qualitative indicators you propose to use for the evaluation of the reach and coverage of project activities and project results. Explain what data will be collected, according to what method and at what moments, including feedback from project participants (satisfaction surveys, evaluation forms, etc). How will findings be analysed and reported and how will they be used. Note: For the evaluation of the activities you will be requested to use the participation evaluation questionnaire to be provided by the Commission. You must identify which indicators you will use from the list provided in the Indicators excel sheet and include them in the indicators of your project. You will be asked to report on those indicators as part of the project's Final Report. Where relevant, data must be disaggregated by gender and by age. The project will be evaluated at four different levels. 14 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 • Level of activities. The evaluation focuses whether the activities in the project were started and completed according to the project schedule. The evaluation will take place continuously and is summarised in the Steering Committee minutes and reports to the financing agency • Level of outputs. The evaluation focuses on the issue whether all the outputs foreseen in the workpackages were produced as planned. The evaluation takes place after each output is “completed” and is summarised in the Steering Committee minutes and reports to the financing agency. For indicators please see WP 1-4 • Level of results. The evaluation focuses on the issue whether all the results foreseen in the project plan were achieved. The evaluation takes place during the project (when a major result or “milestone” has been achieved) and at the end of the project. The results will be summarised in the final report. The indicators used are a) Feedback of project participants about the received trainings (to measure results quality); b) Number of organisations participating in the networks; c) Number of cases professionally solved in Estonian children’s houses (feedback collected 6 months after the project completion); • Level of impact. The evaluation takes place after the project has been completed and the project results and objectives achieved. The evaluation focuses at the whether the increased capacity of relevant experts in children’s houses and network members has helped to solve the cases more effectively and efficiently as well as whether the number of such cases has been reduced. Kirkpatrick’s model will be evaluated to assess all the trainings. It includes feed-back questionnaires covering both content-related issues of the training (materials, delivery, lecturers etc) and form-related issues (venue, commodities etc). The feedback will be taken into account in devising trainings within the project. If necessary and decided together with participants, external evaluation using same methodology would seem a proper solution also. 11. Dissemination strategy and communication tools How do you plan to disseminate (actively spread) information about the project, its activities and its results? Please specify in particular: • Communication needs and objectives: What are the communication needs and objectives of the project? • Target groups and multipliers: What are the target groups? Which stakeholders or other organisations could possibly be supporters and multipliers of the communication activities? • Key messages: Which messages will the activities convey in order to meet the communication objectives? • Distribution channels/tools: Which communicationchannels/tools will be used to convey the messages to your target groups and multipliers? • How will your dissemination strategy facilitate further use and transferability of the project results? Communication needs and objectives, multipliers and key messages The dissemination strategy will enable to reach the direct target groups (children’s house workers, police, prosecutors, judges, social workers, child protection authorities, health, mental health and education services etc) and the general audience with appropriate messages to maximize the impact of the project and ensure the wider introduction of the children’s house model across Europe. For the direct target group the communication objective and key messages are to ensure the participation of target group members in the project and networking activities, to foster smooth cooperation and to exhibit the strengths of the children’s house model over the traditional institutionalised model. The key messages for the general audience is to spread the information what services are provided in the children’s house, who are entitled to benefit from them etc. Distribution channels /tools. - Project website and 4 newsletters: MoSA will create the project website (sub-page to www.sotsiaalkindlustusamet.ee) and will issue 4 newsletter (one every 6 months) to be disseminated to the project mailing list of stakeholders, including the contacts of all partners and the EU networks. 15 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 - Nationwide stakeholder seminars: 2 seminars will be organised in each country - Project final conference: The conference will be organised for approximately 100-150 participants, representing different stakeholder groups and other organisations and institutions involved from all project partner countries and from EU level. - Media coverage to present the progress of the project. Each partner will guarantee the involvement of at least 3 local TV, 2 local Radio channels and 4 newspapers in disseminating information concerning the project. 8 press releases per country (24 in total) and 12 articles per country (36 in total) will be published. 12. Sustainability and long-term impact of the project results What is planned as follow-up of the project after the financial support of the European Union has ended? How will the sustainability of the project's results be assured? Are the project results likely to have a long-term impact? How? Note: In this part you should not list activities or deliverables of your project, but you should focus on the expected long-term impact of your project. The long-term impact refers to long-term socio-economic consequences that can be observed after a certain period following the completion of the project and may affect either the target groups of the project or other groups falling outside the boundary of the project, who may be winners or losers. Introducing the children’s house model into the Estonian child protection system has been decided by the relevant authorities already in 2015. After the EU support has ended, the model will continue to function financed from the state-budget. The guidelines developed, the therapy platform launched and the cooperation network established during the project will continue to operate as part of the general service delivery in Estonia. National co-work with professional schools, universities and other relevant partners to incorporate the concept of MD/IA service to their curricula is consistent since 2016 and several departments have made improvements already. National trainings for local child protection specialists, kindergarten- and school teachers about the topic of child sexual abuse (among other topics) are regular and State-funded in Estonia. New acknowledgment from this project is included to these curricula. In Latvia the Barnahus model will be implemented post-project on the basis of developed and piloted guidelines. Children`s house in Riga will become the main Children`s House and national resource centre. The Children`s houses in regions are planned to organize on the basis of already existing and functioning crisis centres, which have the environment and the facilities for forensic interviewing and which will be already put as further steps in developed guidelines during the project. In Poland, PECF in cooperation with local authorities will open 2 Children’s homes (Child Advocacy Centers) in Warsaw and in the polish coast (Starogard) in 2017 and in 2018 in two other locations. Poland will continue using the counseling methods and guidlines developed in this project. After the project ends the Polish government will be presented with the project results and also continue to be influenced in order to improve the Polish child protection system. The successful piloting of the children’s house model and the implementation of additional therapies in the already existing module will encourage other EU MS to opt for its introduction as well because they can see that the module can be easily adapted in each national context. 13. Ethical issues related to the project Describe any ethical issues which you could come across during the implementation of your project, including with regard to interactions with target groups or persons benefiting from the project, and present your strategy to address them. No major ethical issues will be come across during the implementation of the project. The cases tackled during the trainings (even if based on actual events) will be altered and made anonymous and not recognisable. One relevant issue to be taken into account is data protection when involving individuals in activities. The 16 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 current European regulation already provides many safeguards ensuring that data privacy is maintained throughout any research or service delivery process. By transposing Directive 95/46/EC, Member States jointly set legally binding rules for the protection of individuals with regard to the processing of personal data. The European Commission recently drafted a Regulation (European Commission, 2012) with the intention of comprehensive reform of EU data protection rules. The following assessment is primarily based on the Directive currently in force (European Parliament, 1995), but is expected to remain substantially unchanged under the Regulation. As part of preventive rules for data privacy, all data will be anonymous and all project activities will be carried out on the basis of declarations of consent, when required. The consortium acknowledges ‘Guidance note for researchers and evaluators of social science and humanities’ and national legislation in connection to the collection of personal data will be respected. These measures are necessary to take because of the nature of using real information to generate data and thus rely to a large degree on very sensitive information about and statements of individual persons. 14. Mainstreaming How do you plan to ensure mainstreaming of equality between women and men and the rights of the child, and respect of the Charter of Fundamental Rightsin the activities of your project?. The project will ensure mainstreaming of these aspects by: • Incorporating the gender perspective into project activities. The team of experts represents a balanced gender mix of experts and the project will promote the integration and active participation of women in the foreseen research and expected outputs. A gender approach will be adopted as part of the mainstreaming strategy of equality between women and men and respect of the Charter of Fundamental Rights. For example, gender equality is respected while subcontracting national and International experts. For target group´s point of view, both services are available for both sex victims if they appear to sight of child protection service with concern about their sexual abuse. All materials about sexual abuse address both girls and boys and some of materials also address them with certain gender-differ slogans, which are developed together with police and justice system and are based on local crime statistics. For example human trafficking or/and very young age sexual relations for girls and internet sexual abuse or/and shame-issues for boys. This equals them receiving proper help based on their actual needs. Both mothers and fathers (also same-sex couples) are welcome to receive information and services within this project. Fathers are targeted by including them more than usually, as in Estonia, Latvia and Poland it is mostly mother´s role and possibility to receive services and knowledge together with their child(ren). Same-sex couples are rarely targeted so far in these 3 countries which is a thing this Project changes. Mothers, especially with low-income and single-parent households have special attention both by Project members and Project partners in local municipalities. Unfortunately within Project coordinating team there is a lack of male-members, as majority of employees in social system, both public and non-governmental organisations, are female. The project activities follow the principles stated in Charter of Fundamental Rights of European Union, Article 21, and in particular equal employment opportunities (fostering appropriate mix of ethnic, religion, age and ability features). 17 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 15. Description of child protection policy If applicable If the applicant and/or any of the partners work directly with/have contact with children, provide a description of the child protection policy of these organisations, covering the following topics: • purpose of the child protection policy; • application of the policy (applicable to which staff, in which situations); • responsibility: who is responsible for ensuring that the policy is adhered to; • description of recruitment and screening processes with regard to child protection policy (details of training on child protection policy and rights of the child, screening, vetting (criminal background check). Preventing harm to children: processes exist to help minimise the possibility of children being abused by those in positions of trust. Estonian Ministry of Social Affairs is the national authority responsible for child protection policy development in Estonia and applying the Child Protection Act in Estonia. Also International partner and member of all EU working groups regarding child´s rights and protection. All Project members are Government´s officials and obliged to follow all codes of procedure and ethics stated by National law. NGO Dardedze and NGO Poland Empowering Children Foundation - CHILD PROTECTION POLICY: The project partners follow in their work with children the principles put forward in the UN “Keeping children safe. Standards for child protection”. • All children have equal rights to protection from abuse and exploitation; • All children should be encouraged to fulfil their potential and inequalities should be challenged; • Everybody has a responsibility to support the care and protection of children; • We have a duty of care to children with whom we work and with whom our representatives work • We follow the “child-centred” approach in all our activities involving children. In order to keep the standards we follow these principles: • All workers of NGO Dardedze and NGO Poland Empowering Children Foundation are professionals and they obey the ethical codes of their profession. We do not hire persons who have been convicted in connection with crimes involving children or whose professional behaviour has not met the standards. • All our workers have professional confidentiality • All our workers have the duty to report relevant authorities of any case where a child has been / is / could be in danger. 18 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 16. English translation of the abstract If applicable 19 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 History of changes between your proposal and Annex I to the Grant Agreement "Description of the Action 20 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Please state whether you have made any changes in the data entered in on-line forms in the participant portal (which will become part A of the Description of the Action) when compared to part B of the original proposal (Description of workpackages and activities). Changes suggested in YES/NO1 Concise description of the change(s) the Evaluation Summary Report Other changes YES As NGO, Estonian Advice Centres, stepped back from the leading position from this project, Ministry of Social Affairs is ready to replace them as coordinating organisation. We deleted EAC´s part in our project and took over their coordinating tasks, including main-coordinating. It includes partly EAC´s budget. Please state whether you have made any changes in part B of the Description of the Action when compared to part B of the original proposal (General Description of the project and applicant organisation). Changes suggested in YES No of section/page(s), concise description of the change(s): the Evaluation Summary Report P5: Added information about previously EU-funded initiative PROMISE-project. P10: Added details about piloting new services. P14: Added information about a possible risk mentioned in previous proposal. P15: Added possibility to use external evaluation as a requested method. P16: Added information about long-term impact. P17. Added information about gender equality perspective. Other changes YES No of section/page(s), concise description of the change(s): P12: Deleted description of EAC, replaced it with description of Ministry of Social Affairs´. P13: Deleted “translating materials” as it will no longer be a subcontracted cost. P13: Update project members: added Ann Lind- Liiberg as coordinator; Ester Timmas, Pille Erm and Diana Kalvik as financial managers, Anna Frank-Viron, Viola Läänerand and Nadezda Leosk as experts. P14: Added a potential risk of double-financing and the mitigation measures in case of the 2 partners involved in PROMISE II and BADEV projects. P15: Project webpage will be created under subpage of www.sotsiaalkindlustusamet.ee where is all other information about 116 111 and Children´s Houses (not www.abikeskused.ee as in proposal). P18: Described Ministry´s child protection policy as it differs from NGO´s. Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Changes in the Portal linked to partner Centre Dardedze: Added a potential risk of double-financing under the section “Critical Risks.” Removed from deliverables and also from Workpackage 2 “Elaborating Children`s House manual in Latvia”. Added to Workpackage 2: “Implement and evaluate “Recommendations for Barnahus model in Latvia” in Riga, in Centre Dardedze (30 cases)”. Budget: Removed 1500,00 euros from Dardedze budget heading A2 and 1500,00 euros from their budget heading E2 (upon deleting the activity “Elaborating Children`s House manual in Latvia”). For Centre Dardedze, the EC requested amount was reduced to 66,429.88 € upon reduction of its costs. 1 Delete what is not applicable 21 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Note: Please note that changes to your original proposal should be limited to modifications suggested in the Evaluation Summary Report. We strongly advise against any other changes at this point as they may lead to the Commission considering the modified proposal as not compliant with the one recommended for funding and terminating the grant agreement preparation. Should you wish to introduce some modifications nevertheless (e.g. as a result of "force majeure" changes that occurred since the date of your original proposal), these must be indicated in the table. Failure to clearly signal any changes made to your proposal may lead to termination of the grant agreement preparation or – at any point following the signature of a grant agreement – to the termination of the grant agreement by the Commission. In accordance with Art. 34.3.1 (i)(ii). 22 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 ESTIMATED BUDGET FOR THE ACTION (page 1 of 2) Associated with document Ref. Ares(2017)6150899 - 14/12/2017 1 Estimated eligible costs (per budget category) EU contribution Action's estimated receipts A. Direct B. Direct travel and subsistence costs C. Direct [D. Direct costs E. Other direct F. Indirect Total costs Financial personnel costs costs of of fin. support] costs costs3 Income contributions Reimbursement Maximum EU Maximum Action’s subcontracting generated by given by third rate %4 contribution5 grant amount6 total receipts the action parties to the beneficiaries A.1 B.1 Travel B. Subsistence D.1 Financial E.1 Employees (or support Equipment equivalent) D.2 Prizes E.2 Other A.2 Natural goods and persons under services direct contract and seconded persons Form of costs7 Actual Actual Actual Unit8 Actual Actual Actual Flat-rate9 f = flat- g = a + b1 rate * a b1 [b2] No Total [b2] c [d] e + b2 + h i=g*h j k l m=k+l (a + b1 +b2 c + [d]+ e + f + c + [d] + e) 1. MSAE 62,900.00 6,000.00 6,720.00 44,300.00 0.00 23,200.00 10,018.40 153,138.40 80 122,510.72 122,510.72 0.00 0.00 0.00 2. Centrs 47,667.00 9,570.00 4,168.00 13,000.00 0.00 3,200.00 5,432.35 83,037.35 80 66,429.88 66,429.88 0.00 0.00 0.00 Dardedze 3. FDDS 75,238.00 14,300.00 7,813.00 22,240.00 0.00 1,700.00 8,490.37 129,781.37 80 103,825.10 103,824.00 0.00 0.00 0.00 Total 185,805.00 29,870.00 18,701.00 79,540.00 0.00 28,100.00 23,941.12 365,957.12 80 292,765.70 292,764.60 0.00 0.00 0.00 consortium 1 Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01 ESTIMATED BUDGET FOR THE ACTION (page 2 of 2) Associated with document Ref. Ares(2017)6150899 - 14/12/2017 (1) See Article 6 for the eligibility conditions. (2) The consortium remains free to decide on a different internal distribution of the EU funding (via the consortium agreement; see Article 25.3) (3) The indirect costs claimed must be free of any amounts covered by an operating grant (received under any EU or Euratom funding programme). A beneficiary that receives an operating grant during the duration of the action cannot claim any indirect costs for the year(s) covered by the operating grant (see Article 6.2.F) (4) For the reimbursement rate, see Article 5.2 (5) This is the theoretical amount of the EU contribution, if the reimbursement rate is applied to all the budgeted costs. This theoretical amount is capped by the 'maximum grant amount' (6) The 'maximum grant amount' is the maximum grant amount decided by the Commission. It normally corresponds to the requested grant, but may be lower (7) See Article 5 for the cost forms (8) See Annex 2a 'Additional information on the estimated budget' for the details (units, cost per unit) (9) For the flat rate, see Article 6.2.F 2 Grant Agreement number: 764255 — BADEV Associated with document Ref. Ares(2017)6150899 - 14/12/2017 ANNEX 3 ACCESSION FORM FOR BENEFICIARIES NODIBINAJUMS CENTRS DARDEDZE (Centrs Dardedze), established in CIECERES IELA 3A, RIGA LV-1002, Latvia, (‘the beneficiary’), represented for the purpose of signing this Accession Form by the undersigned, hereby agrees to become beneficiary No (‘2’) in Grant Agreement No 764255 (‘the Grant Agreement’) between SOTSIAALMINISTEERIUM and the European Union (‘the EU’), represented by the European Commission ('the Commission'), for the action entitled Enhancing Barnahus model service delivery in Estonia, Latvia and Poland (BADEV). and mandates the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement, in accordance with Article 39. By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in accordance with the Agreement, with all the obligations and conditions it sets out. SIGNATURE For the beneficiary/new beneficiary/new coordinator [--TGSMark#signature-919687071_75_210--] Liena KRUMINA with ECAS id nkrliena signed in the Participant Portal on 19/12/2017 at 13:51:19 (transaction id SigId-189349- CDMVBeOb9zOhcRCKWgecmzzWnBqbWOSPY3fKFWZ9 cmTaMtbuAZAOYpzrXOninAxaVHdGFOfi2akWBbPVTTm 1eTK-PHslUMVSXYCIMrSeUedOzH- UxImOM6e4cc5UlfO8VfSwygsRtwzWDPFWUhlJ1MiBJI). Timestamp by third party at Tue Dec 19 13:51:31 CET 2017 1 Grant Agreement number: 764255 — BADEV Associated with document Ref. Ares(2017)6150899 - 14/12/2017 ANNEX 3 ACCESSION FORM FOR BENEFICIARIES FUNDACJA DAJEMY DZIECIOM SILE (FDDS), established in UL. WALECZNYCH 59, WARSZAWA 03 926, Poland, VAT number: PL1130725676, (‘the beneficiary’), represented for the purpose of signing this Accession Form by the undersigned, hereby agrees to become beneficiary No (‘3’) in Grant Agreement No 764255 (‘the Grant Agreement’) between SOTSIAALMINISTEERIUM and the European Union (‘the EU’), represented by the European Commission ('the Commission'), for the action entitled Enhancing Barnahus model service delivery in Estonia, Latvia and Poland (BADEV). and mandates the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement, in accordance with Article 39. By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in accordance with the Agreement, with all the obligations and conditions it sets out. SIGNATURE For the beneficiary/new beneficiary/new coordinator [--TGSMark#signature-951188500_75_210--] Maria KELLER-HAMELA with ECAS id nklermri signed in the Participant Portal on 19/12/2017 at 13:52:23 (transaction id SigId-189376- lQYST5zczwqazahEzsYUeF2noEmjRRXOcMzjYBSlpO9U wIoSlHn67L9r8oTzziv4dJKbaFMTVBMGI4aTtDIGx0YK- PHslUMVSXYCIMrSeUedOzH- tRjDh3dLVLzquL7TkWqNoeV8Vtm9XMzytLJitDWulQBG). Timestamp by third party at Tue Dec 19 13:52:33 CET 2017 2 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 i print format A4 MODEL ANNEX 4 JUST MGA — MULTI landscape FINANCIAL STATEMENT FOR [BENEFICIARY [name] / AFFILIATED ENTITY [name]] FOR REPORTING PERIOD [reporting period] 1 Eligible costs (per budget category) Receipts EU contribution Financial C. Direct costs F. Indirect Income Reimburseme Maximum EU A. Direct personnel [D. Direct costs of fin. E. Other direct contributions given Requested EU B. Direct travel and subsistence costs of 2 Total costs generated by Total receipts 3 4 costs support] costs costs by third parties to nt rate % constribution contribution subcontracting the action the beneficiaries A.1 Employees (or [D.1 Financial B.1 Travel B.2 Subsistence E.1 Equipment equivalent) support ] A.2 Natural persons E.2 Other goods [D.2 Prizes ] under direct contract and services and seconded persons 5 Actual Actual Actual 6 Actual Actual Actual 7 Cost form Unit Flat-rate f= g= a b1 [b2] No Total [b2] c [d] e flat-rate * (a + b1 a+ b1 +b2 + c [+ d h i j= h + i k l m +b2 + c [+d ] + e) ]+e+f [short name beneficiary / affiliated entity] The beneficiary/affiliated entity hereby confirms that: The information provided is complete, reliable and true. The costs declared are eligible (see Article 6). The costs can be substantiated by adequate records and supporting documentation that will be produced upon request or in the context of checks, reviews, audits and investigations (see Articles 12, 13 and 17). For the last reporting period: that all the receipts have been declared (see Article 5.3.3). i Please declare all eligible costs, even if they exceed the amounts indicated in the estimated budget (see Annex 2). Only amounts that were declared in your individual financial statements can be taken into account lateron, in order to replace other costs that are found to be ineligible. 1 See Article 6 for the eligibility conditions. 2 The indirect costs claimed must be free of any amounts covered by an operating grant (received under any EU or Euratom funding programme). A beneficiary that receives an operating grant during the duration of the action cannot claim any indirect costs for the year(s) covered by the operating grant (see Article 6.2.F). 3 See Article 5.2 for the reimbursement rate. 4 This is the theoretical amount of EU contribution that the system calculates automatically (by multiplying the reimbursement rate by the total costs declared). The amount you request (in the column 'requested EU contribution') may be less. 5 See Article 5.2 for the cost forms. 6 See Annex 2a 'Additional information on the estimated budget' for the details (units, cost per unit). 7 See Article 6.2.F for the flat-rate. Associated with document Ref. Ares(2017)6150899 - 14/12/2017 ANNEX 5 MODEL FOR THE CERTIFICATE ON THE FINANCIAL STATEMENT (CFS) This document sets out: - the objectives and scope of the independent report of factual findings on costs declared under a EU grant agreement financed under the Rights equality and citizenship Programme 2014-2020 or the Justice Programme 2014-2020 and - a model for the certificate on the financial statement (CFS). 1. Background and subject matter [OPTION 1 for actions with one RP and NO interim payments: Within 60 days of the end of the reporting period, the coordinator must submit to the Commission a final report, which should include (among other documents and unless otherwise specified in Article 15 of the Grant Agreement) a certified financial statement (CFS; see proposed model below) for each beneficiary and (if applicable) each affiliated entity, if: - the cumulative amount of payments the beneficiary/affiliated entity requests as reimbursement of actual costs is EUR 325 000 or more and - the maximum EU contribution indicated for that beneficiary/affiliated entity in the estimated budget (see Annex 2) as reimbursement of actual costs is EUR 750 000 or more.] [OPTION 2 for actions with several RPs and interim payments: Within 60 days of the end of each reporting period, the coordinator must submit to the Commission a periodic report, which should include (among other documents and unless otherwise specified in Article 15 of the Grant Agreement) a certified financial statement (CFS; see proposed model below) for each beneficiary and (if applicable) each affiliated entity, if: - the cumulative amount of payments the beneficiary/affiliated entity requests as reimbursement of actual costs is EUR 325 000 or more and - the maximum EU contribution indicated for that beneficiary/affiliated entity in the estimated budget (see Annex 2) as reimbursement of actual costs is EUR 750 000 or more. The CFS must be submitted every time the cumulative amount of payments requested (i.e. including in previous financial statements) reaches the threshold (i.e. a first certificate once the cumulative amount reaches 325 000, a second certificate once it reaches 650 000, a third certificate once it reaches 975 000, etc.). Once the threshold is reached, the CFS must cover all reporting periods for which no certificate has yet been submitted.] 1 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 The beneficiary must provide the CFS for itself and, if applicable, for its affiliated entity(ies). The purpose of the audit on which the CFS is based is to give the Commission ‘reasonable assurance’1 that costs declared as eligible costs under the grant (and, if relevant, receipts generated in the course of the action) are being claimed by the beneficiary in accordance with the relevant legal and financial provisions of the Grant Agreement. The scope of the audit is limited to the verification of eligible costs included in the CFS. The audit must be conducted in line with point 3 below. Certifying auditors must carry out the audits in compliance with generally accepted audit standards and indicate which standards they have applied. They must bear in mind that, to establish a CFS, they must carry out a compliance audit and not a normal statutory audit. The eligibility criteria in the Grant Agreement always override normal accounting practices. The beneficiary and the auditor are expected to address any questions on factual data or detailed calculations before the financial statement and the accompanying certificate are submitted. It is also recommended that the beneficiary take into account the auditor’s preliminary comments and suggestions in order to avoid a qualified opinion or reduce the scope of the qualifications. Since the certificate is the main source of assurance for cost claims and payments, it will be easier to consider amounts as eligible if a non-qualified certificate is provided.. The submission of a certificate does not affect the Commission’s right to carry out its own assessment or audits. Neither does the reimbursement of costs covered by a certificate preclude the Commission, the European Anti-Fraud Office or the European Court of Auditors from carrying out checks, reviews, audits and investigations in accordance with Article 17 of the Grant Agreement. The Commission expects the certificates to be issued by auditors according to the highest professional standards. 2. Auditors who may deliver a certificate The beneficiary is free to choose a qualified external auditor, including its usual external auditor, provided that: - the external auditor is independent from the beneficiary and - the provisions of Directive 2006/43/EC2 are complied with. 1 This means a high degree of confidence. 2 Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of annual accounts and consolidated accounts or similar national regulations (OJ L 157, 9.6.2006, p. 87). 2 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Independence is one of the qualities that permit the auditor to apply unbiased judgement and objective consideration to established facts to arrive at an opinion or a decision. It also means that the auditor works without direction or interference of any kind from the beneficiary. Auditors are considered as providing services to the beneficiary under a purchase contract within the meaning of Article 9 of the Grant Agreement. This means that the costs of the CFS may normally be declared as costs incurred for the action, if the cost eligibility rules set out in Articles 6 and 9.1.1 of the Grant Agreement are fulfilled (especially: best value for money and no conflict of interests; see also below eligibility of costs of other goods and services). Where the beneficiary uses its usual external auditor, it is presumed that they already have an agreement that complies with these provisions and there is no obligation to find new bids. Where the beneficiary uses an external auditor who is not their usual external auditor, it must select an auditor following the rules set out in Article 9.1.1. Public bodies can choose an external auditor or a competent public officer. In the latter case, the auditor’s independence is usually defined as independence from the audited beneficiary ‘in fact and in appearance’. A preliminary condition is that this officer was not involved in any way in drawing up the financial statements. Relevant national authorities establish the legal capacity of the officer to carry out audits of that specific public body. The certificate should refer to this appointment. 3. Audit methodology and expected results 3.1 Verification of eligibility of the costs declared The auditor must conduct its verification on the basis of inquiry and analysis, (re)computation, comparison, other accuracy checks, observation, inspection of records and documents and by interviewing the beneficiary (and the persons working for it). The auditor must examine the following documentation:  the Grant Agreement and any amendments to it;  the periodical and/or final report(s);  for personnel costs o salary slips; o time sheets; o contracts of employment; o other documents (e.g. personnel accounts, social security legislation, invoices, receipts, etc.); o proofs of payment;  for travel and subsistence costs o the beneficiary’s internal rules on travel; o transport invoices and tickets (if applicable); o declarations by the beneficiary; o other documents (proofs of attendance such as minutes of meetings, reports, etc.); o proofs of payment;  for equipment costs o invoices; o delivery slips / certificates of first use; 3 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 o proofs of payment; o depreciation method of calculation;  for subcontracting o the call for tender; o tenders (if applicable); o justification for the choice of subcontractor; o contracts with subcontractors; o invoices; o declarations by the beneficiary; o proofs of payment; o other documents: e.g. national rules on public tendering if applicable, EU Directives, etc.;  for costs of other goods and services o invoices; o proofs of payment; and o other relevant accounting documents. General eligibility rules The auditor must verify that the costs declared comply with the general eligibility rules set out in Article 6.1 of the Grant Agreement. In particular, the costs must:  be actually incurred;  be linked to the subject of the Grant Agreement and indicated in the beneficiary's estimated budget (i.e. the latest version of Annex 2);  be necessary to implement the action which is the subject of the grant;  be reasonable and justified, and comply with the requirements of sound financial management, in particular as regards economy and efficiency;3  have been incurred during the action, as defined in Article 3 of the Grant Agreement (with the exception of the invoice for the audit certificate and costs relating to the submission of the final report);  not be covered by another EU or Euratom grant (see below ineligible costs);  be identifiable, verifiable and, in particular, recorded in the beneficiary's accounting records and determined according to the applicable accounting standards of the country where it is established and its usual cost-accounting practices;  comply with the requirements of applicable national laws on taxes, labour and social security;  be in accordance with the provisions of the Grant Agreement (see, in particular, Articles 6 and 9-11a) and  have been converted to euro at the rate laid down in Article 15.6 of the Grant Agreement: o for beneficiaries with accounts established in a currency other than the euro: Costs incurred in another currency must be converted into euros at the average of the daily exchange rates published in the C series of the EU Official Journal determined over the corresponding reporting period. 3 To be assessed in particular on the basis of the procurement and selection procedures for service providers. 4 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 If no daily euro exchange rate is published in the EU Official Journal for the currency in question, the rate used must be the average of the monthly accounting rate established by the Commission and published on its website; o for beneficiaries with accounts established in euro: Costs incurred in another currency should be converted into euros applying the beneficiary’s usual accounting practice. The auditor must verify whether expenditure includes VAT and, if so, verify that the beneficiary: - cannot recover the VAT (this must be supported by a statement from the competent body) and - is not a public body acting as a public authority. The auditor should base his/her audit approach on the confidence level following a review of the beneficiary's internal control system. When using sampling, the auditor should indicate and justify the sampling size. Specific eligibility rules In addition, the auditor must verify that the costs declared comply with the specific cost eligibility rules set out in Article 6.2 and Articles 9.1.1, 10.1.1, 11.1.1, 11a.1.1 and 11a.2.1 of the Grant Agreement. Personnel costs The auditor must verify that:  personnel costs have been charged and paid in respect of the actual time devoted by the beneficiary’s personnel to implementing the action (justified on the basis of time sheets or other relevant time-recording system);  personnel costs were calculated on the basis of annual gross salary, wages or fees (plus obligatory social charges, but excluding any other costs) specified in an employment or other type of contract, not exceeding the average rates corresponding to the beneficiary’s usual policy on remuneration;  the work was carried out during the period of implementation of the action, as defined in Article 3 the Grant Agreement;  the personnel costs are not covered by another EU or Euratom grant (see below ineligible costs);  for additional remunerations: the 2 conditions set out in Article 6.2.A.1 of the Grant Agreement are met (i.e. that it is part of the beneficiary’s usual remuneration practices and is paid in a consistent manner whenever the same kind of work or expertise is required and that the criteria used to calculate the supplementary payments are objective and generally applied by the beneficiary, regardless of the source of funding used);  for in-house consultants: the 3 conditions set out in Article 6.2.A.2 of the Grant Agreement are met (i.e. that the in-house consultant works under the beneficiary’s instructions, that the result of the work carried out belongs to the beneficiary, and that the costs are not significantly different from those for personnel performing similar tasks under an employment contract). 5 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 The auditor should have assurance that the management and accounting system ensures proper allocation of the personnel costs to various activities carried out by the beneficiary and funded by various donors. Travel and subsistence costs The auditor must verify that travel and subsistence costs:  have been charged and paid in accordance with the beneficiary's internal rules or usual practices (or, in the absence of such rules or practices, that they do not exceed the scale normally accepted by the Commission4;  are not covered by another EU or Euratom grant (see below ineligible costs)  were incurred for travels linked to action tasks set out in Annex 1 of the Grant Agreement;  were incurred in the eligible countries set out in the call for proposals. Equipment costs The auditor must verify that:  the equipment was acquired during the period of implementation of the action, as defined in Article 3 of the Grant Agreement;  the equipment is purchased, rented or leased at normal market prices;  public bodies have complied with the national rules on public procurement;  the equipment is written off, depreciation has been calculated according to the tax and accounting rules applicable to the beneficiary and only the portion of the depreciation corresponding to the duration of the action has been declared and  the costs are not covered by another EU or Euratom grant (see below ineligible costs). Costs of other goods and services The auditor must verify that:  the purchase complies with best value for money (or lowest price) and that there was no conflict of interests;  public bodies have complied with the national rules on public procurement;  the costs are not covered by another EU or Euratom grant (see below ineligible costs). Subcontracting costs The auditor must verify that:  the subcontracting complies with best value for money (or lowest price) and that there was no conflict of interests;  the subcontracting was necessary to implement the action for which the grant is requested;  the subcontracting was provided for in Annex 1 and Annex 2 or agreed to by the Commission at a later stage; 4 See the Guide for Applicants — Action Grants. 6 Associated with document Ref. Ares(2017)6150899 - 14/12/2017  the subcontracting is supported by accounting documents in accordance with national accounting law;  public bodies have complied with the national rules on public procurement. Ineligible costs The auditor must verify that the beneficiary has not declared any costs that are ineligible under Article 6.4 of the Grant Agreement:  costs relating to return on capital;  debt and debt service charges;  provisions for future losses or debts;  interest owed;  doubtful debts;  currency exchange losses;  bank costs charged by the beneficiary’s bank for transfers from the Commission;  excessive or reckless expenditure;  deductible VAT;  VAT incurred by a public body acting as a public authority;  costs incurred during suspension of the implementation of the action;  in-kind contributions from third parties;  costs declared under other EU or Euratom grants (including those awarded by a Member State and financed by the EU or Euratom budget or awarded by bodies other than the Commission for the purpose of implementing the EU or Euratom budget); in particular, indirect costs if the beneficiary is already receiving an operating grant financed by the EU or Euratom budget in the same period;  costs incurred for permanent staff of a national administration for activities that are part of its normal activities (i.e. not undertaken only because of the grant);  costs incurred for staff or representatives of EU institutions, bodies or agencies;  costs for activities that do/did not take place in one of the eligible countries specified in the call for proposals (unless approved by the Commission). For more information on cost eligibility, see the Guide for applicants — Action Grants. 3.2 Verification of receipts The auditor must verify that the beneficiary has declared receipts within the meaning of Article 5.3.3 of the Grant Agreement, i.e.:  income generated by the action (e.g. from the sale of products, services and publications, conference fees) and  financial contributions given by third parties, specifically to be used for costs that are eligible under the action. 3.3 Verification of the beneficiary’s accounting system The auditor must verify that:  the accounting system (analytical or other suitable internal system) makes it possible to identify sources of financing for the action and related expenses incurred during the contractual period and 7 Associated with document Ref. Ares(2017)6150899 - 14/12/2017  expenses/income under the grant have been recorded systematically using a numbering system that distinguishes them from expenses/income for other projects. 8 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 Certificate on the financial statement (CFS) To [Beneficiary/affiliated entity’s full name address] We, [full name of the audit firm/organisation], established in [full address/city/country], represented for signature of this audit certificate by [name and function of an authorised representative], hereby certify that: 1. We have conducted an audit relating to the costs declared in the financial statement of [name of beneficiary/affiliated entity] (the [‘beneficiary’][‘affiliated entity’]), to which this audit certificate is attached and which is to be presented to the European Commission under Grant Agreement No [insert number] — [insert acronym], covering costs for the following reporting period(s): [insert reporting period(s)]. 2. We confirm that our audit was carried out in accordance with generally accepted auditing standards in compliance with ethical rules and on the basis of the provisions of the Grant Agreement and its Annexes (and in particular the audit methodology described in Annex 5). 3. The financial statement was examined and all necessary tests of [all][[X]%] of the supporting documentation and accounting records were carried out in order to obtain reasonable assurance that, in our opinion and on the basis of our audit  total costs of EUR [insert number] ([insert amount in words]) are eligible, i.e.:  actual;  determined in accordance with the [beneficiary’s][affiliated entity’s] accounting principles;  incurred during the period referred to in Article 3 of the Grant Agreement;  recorded in the [beneficiary’s][affiliated entity’s] accounts (at the date of this audit certificate);  comply with the specific eligibility rules in Article 6.2 of the Grant Agreement;  do not contain costs that are ineligible under Article 6.4 of the Grant Agreement, in particular:  costs relating to return on capital;  debt and debt service charges;  provisions for future losses or debts;  interest owed;  doubtful debts;  currency exchange losses;  bank costs charged by the [beneficiary’s][affiliated entity’s] bank for transfers from the Commission  excessive or reckless expenditure; 9 Associated with document Ref. Ares(2017)6150899 - 14/12/2017  deductible VAT;  VAT incurred by a public body acting as a public authority;  costs incurred during suspension of the implementation of the action;  in-kind contributions provided by third parties;  costs declared under other EU or Euratom grants (including those awarded by a Member State and financed by the EU or Euratom budget or awarded by bodies other than the Commission for the purpose of implementing the EU or Euratom budget); in particular, indirect costs if the [beneficiary][affiliated entity] is already receiving an operating grant financed by the EU or Euratom budget in the same period;  costs incurred for permanent staff of a national administration, for activities that are part of its normal activities (i.e. not undertaken only because of the grant);  costs incurred for staff or representatives of EU institutions, bodies or agencies;  costs for activities that do not take place in one of the eligible countries specified in the call for proposals (unless approved by the Commission);  [are claimed according to the euro conversion rate referred to in Article 15.6 of the Grant Agreement;]  total receipts of EUR [insert number] ([insert amount in words]) have been declared under Article 5.3.3 of the Grant Agreement and  the [beneficiary’s][affiliated entity’s] accounting procedures are in compliance with the accounting rules of the state in which it is established and permit direct reconciliation of the costs incurred for the implementation of the action covered by the EU grant with the overall statement of accounts relating to its overall activity. [However, our audit opinion is qualified for:  costs of EUR [insert number]  receipts of EUR [insert number] which in our opinion do not comply with the applicable rules.] 4. We are qualified/authorised to deliver this audit certificate [(for additional information, see appendix to this certificate)]. 5. The [beneficiary][affiliated entity] paid a price of EUR [insert number]) (including VAT of EUR [insert number]) for this audit certificate. [OPTION 1: These costs are eligible (i.e. incurred within 60 days of the end of the action referred to in Article 3 of the Grant Agreement) and included in the financial statement.][OPTION 2: These costs were not included in the financial statement.] Date, signature and stamp 10 Associated with document Ref. Ares(2017)6150899 - 14/12/2017 ANNEX 7 [OPTION 1 if further pre-financing payments foreseen in Article 15.2a: MODEL FOR THE STATEMENT ON THE USE OF THE PREVIOUS PRE-FINANCING PAYMENT  For fields in [grey in square brackets]: enter the appropriate data STATEMENT ON THE USE OF THE FIRST PRE-FINANCING PAYMENT (To be filled out by the coordinator) The undersigned: - declares that […] % of the first pre-financing payment of EUR [insert amount] paid for Grant Agreement No [insert number] — [acronym] have been used, - declares that this is based on substantiated data (bank slip/treasury account) provided by each beneficiary, - certifies that the information contained in the progress report is full, reliable and true, and is substantiated by adequate supporting documentation that can be produced in the context of checks, reviews, audits and investigations, - requests a second pre-financing payment of EUR [insert amount]. SIGNATURE For the coordinator: [electronic signature] Done on [electronic time stamp] ] [OPTION 2: Not applicable] 1 Digitally sealed by the European Commission Date: 2017.12.14 16:40:20 CET This document is digitally sealed. The digital sealing mechanism uniquely binds the document to the modules of the Participant Portal of the European Commission, to the transaction for which it was generated and ensures its integrity and authenticity. Any attempt to modify the content will lead to a breach of the electronic seal, which can be verified at any time by clicking on the digital seal validation symbol. Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. +32 22991111
Allikas: Sotsiaalministeerium dokumendiregister →