Sotsiaalministeerium · 3. jaanuar 2018
Sisu (failidest)
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
EUROPEAN COMMISSION
Directorate General Justice and Consumers
Programme and financial management
GRANT AGREEMENT
NUMBER — 764255 — BADEV
This Agreement (‘the Agreement’) is between the following parties:
on the one part,
the European Union (‘the EU’), represented by the European Commission ('the Commission'),
represented for the purposes of signature of this Agreement by Daniela BANKIER, Head of
Unit, DIRECTORATE-GENERAL JUSTICE AND CONSUMERS , Programme and financial
management,
and
on the other part,
1. ‘the coordinator’:
SOTSIAALMINISTEERIUM (MSAE), established in Suur-Ameerika 1, TALLINN 10122,
Estonia, represented for the purposes of signing the Agreement by Marika PRISKE
and the following other beneficiaries, if they sign their ‘Accession Form’ (see Annex 3 and Article 40):
2. NODIBINAJUMS CENTRS DARDEDZE (Centrs Dardedze), established in CIECERES IELA
3A, RIGA LV-1002, Latvia,
3. FUNDACJA DAJEMY DZIECIOM SILE (FDDS), established in UL. WALECZNYCH 59,
WARSZAWA 03 926, Poland, VAT number: PL1130725676,
Unless otherwise specified, references to ‘beneficiary’ or ‘beneficiaries’ include the coordinator.
The parties referred to above have agreed to enter into the Agreement under the terms and conditions
below.
By signing the Agreement or the Accession Form, the beneficiaries accept the grant and agree to
implement the action under their own responsibility and in accordance with the Agreement, with all
the obligations and conditions it sets out.
1
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
The Agreement is composed of:
Terms and Conditions
Annex 1 Description of the action
Annex 2 Estimated budget for the action
Annex 2a Not applicable
Annex 3 Accession Forms
Annex 4 Model for the financial statements
Annex 5 Model for the certificate on the financial statements (CFS)
Annex 6 Not applicable
2
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
TERMS AND CONDITIONS
TABLE OF CONTENTS
CHAPTER 1 GENERAL ............................................................................................................................................... 8
ARTICLE 1 — SUBJECT OF THE AGREEMENT ....................................................................................... 8
CHAPTER 2 ACTION ...................................................................................................................................................8
ARTICLE 2 — ACTION TO BE IMPLEMENTED ........................................................................................8
ARTICLE 3 — DURATION AND STARTING DATE OF THE ACTION .....................................................8
ARTICLE 4 — ESTIMATED BUDGET AND BUDGET TRANSFERS ....................................................... 8
4.1 Estimated budget .................................................................................................................................... 8
4.2 Budget transfers ..................................................................................................................................... 8
CHAPTER 3 GRANT .................................................................................................................................................... 8
ARTICLE 5 — GRANT AMOUNT, FORM OF GRANT, REIMBURSEMENT RATE AND FORMS OF
COSTS ............................................................................................................................................ 8
5.1 Maximum grant amount .........................................................................................................................8
5.2 Form of grant, reimbursement rates and forms of costs ........................................................................9
5.3 Final grant amount — Calculation ........................................................................................................ 9
5.4 Revised final grant amount — Calculation ......................................................................................... 10
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS ...............................................................................11
6.1 General conditions for costs to be eligible ..........................................................................................11
6.2 Specific conditions for costs to be eligible ......................................................................................... 12
6.3 Conditions for costs of affiliated entities to be eligible ...................................................................... 14
6.4 Ineligible costs ..................................................................................................................................... 14
6.5 Consequences of declaration of ineligible costs ..................................................................................15
CHAPTER 4 RIGHTS AND OBLIGATIONS OF THE PARTIES ........................................................................ 15
SECTION 1 RIGHTS AND OBLIGATIONS RELATED TO IMPLEMENTING THE ACTION ................ 15
ARTICLE 7 — GENERAL OBLIGATION TO PROPERLY IMPLEMENT THE ACTION ........................15
7.1 General obligation to properly implement the action ..........................................................................16
7.2 Consequences of non-compliance ........................................................................................................16
ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD PARTY INVOLVED IN THE
ACTION ....................................................................................................................................... 16
ARTICLE 8a — IMPLEMENTATION OF ACTION TASKS BY BENEFICIARIES NOT RECEIVING EU
FUNDING .....................................................................................................................................16
ARTICLE 9 — PURCHASE OF GOODS, WORKS OR SERVICES ...........................................................16
3
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
9.1 Rules for purchasing goods, works or services ................................................................................... 16
9.2 Consequences of non-compliance ........................................................................................................17
ARTICLE 10 — IMPLEMENTATION OF ACTION TASKS BY SUBCONTRACTORS .......................... 17
10.1 Rules for subcontracting action tasks ................................................................................................ 17
10.2 Consequences of non-compliance ......................................................................................................18
ARTICLE 11 — IMPLEMENTATION OF ACTION TASKS BY AFFILIATED ENTITIES ...................... 18
ARTICLE 11a — FINANCIAL SUPPORT TO THIRD PARTIES ............................................................... 18
11a.1 Rules for providing financial support to third parties ......................................................................18
11a.2 Financial support in the form of prizes ............................................................................................18
11a.3 Consequences of non-compliance .................................................................................................... 18
SECTION 2 RIGHTS AND OBLIGATIONS RELATED TO THE GRANT ADMINISTRATION .............. 18
ARTICLE 12 — GENERAL OBLIGATION TO INFORM .......................................................................... 18
12.1 General obligation to provide information upon request ...................................................................18
12.2 Obligation to keep information up to date and to inform about events and circumstances likely to
affect the Agreement ..........................................................................................................................19
12.3 Consequences of non-compliance ......................................................................................................19
ARTICLE 13 — KEEPING RECORDS — SUPPORTING DOCUMENTATION ....................................... 19
13.1 Obligation to keep records and other supporting documentation ...................................................... 19
13.2 Consequences of non-compliance ......................................................................................................20
ARTICLE 14 — SUBMISSION OF DELIVERABLES ................................................................................ 20
14.1 Obligation to submit deliverables ...................................................................................................... 20
14.2 Consequences of non-compliance ......................................................................................................21
ARTICLE 15 — REPORTING — PAYMENT REQUESTS .........................................................................21
15.1 Obligation to submit reports .............................................................................................................. 21
15.2 Reporting periods ............................................................................................................................... 21
15.2a Request(s) for further pre-financing payment(s) ..............................................................................21
15.3 Periodic reports — Requests for interim payments ...........................................................................21
15.4 Final report — Request for payment of the balance ......................................................................... 21
15.5 Information on cumulative expenditure incurred .............................................................................. 22
15.6 Currency for financial statements and conversion into euro ............................................................. 22
15.7 Language of reports ........................................................................................................................... 23
15.8 Consequences of non-compliance ......................................................................................................23
ARTICLE 16 — PAYMENTS AND PAYMENT ARRANGEMENTS .........................................................23
16.1 Payments to be made ......................................................................................................................... 23
4
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
16.2 Pre-financing payment(s) — Amount ................................................................................................23
16.3 Interim payments — Amount — Calculation ................................................................................... 23
16.4 Payment of the balance — Amount — Calculation .......................................................................... 24
16.5 Notification of amounts due .............................................................................................................. 24
16.6 Currency for payments .......................................................................................................................24
16.7 Payments to the coordinator — Distribution to the beneficiaries ......................................................24
16.8 Bank account for payments ............................................................................................................... 25
16.9 Costs of payment transfers ................................................................................................................ 25
16.10 Date of payment ...............................................................................................................................25
16.11 Consequences of non-compliance ....................................................................................................25
ARTICLE 17 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF
FINDINGS ....................................................................................................................................26
17.1 Checks, reviews and audits by the Commission ............................................................................... 26
17.2 Investigations by the European Anti-Fraud Office (OLAF) ..............................................................28
17.3 Checks and audits by the European Court of Auditors (ECA) ..........................................................28
17.4 Checks, reviews, audits and investigations for international organisations ....................................... 28
17.5 Consequences of findings in checks, reviews, audits and investigations — Extension of findings
..............................................................................................................................................................28
17.6 Consequences of non-compliance ......................................................................................................30
ARTICLE 18 — EVALUATION OF THE IMPACT OF THE ACTION ...................................................... 30
18.1 Right to evaluate the impact of the action ........................................................................................ 30
18.2 Consequences of non-compliance ......................................................................................................30
SECTION 3 OTHER RIGHTS AND OBLIGATIONS .......................................................................................30
ARTICLE 19 — PRE-EXISTING RIGHTS AND OWNERSHIP OF THE RESULTS (INCLUDING
INTELLECTUAL AND INDUSTRIAL PROPERTY RIGHTS) ................................................ 31
19.1 Pre-existing rights and access rights to pre-existing rights ............................................................... 31
19.2 Ownership of results and rights of use ..............................................................................................31
19.3 Consequences of non-compliance ......................................................................................................31
ARTICLE 20 — CONFLICT OF INTERESTS ............................................................................................. 31
20.1 Obligation to avoid a conflict of interests ......................................................................................... 31
20.2 Consequences of non-compliance ......................................................................................................31
ARTICLE 21 — CONFIDENTIALITY ......................................................................................................... 32
21.1 General obligation to maintain confidentiality .................................................................................. 32
21.2 Consequences of non-compliance ......................................................................................................32
ARTICLE 22 — PROMOTING THE ACTION — VISIBILITY OF EU FUNDING ...................................32
5
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
22.1 Communication activities by the beneficiaries .................................................................................. 32
22.2 Communication activities by the Commission .................................................................................. 33
22.3 Consequences of non-compliance ......................................................................................................34
ARTICLE 23 — PROCESSING OF PERSONAL DATA ............................................................................. 34
23.1 Processing of personal data by the Commission ............................................................................... 34
23.2 Processing of personal data by the beneficiaries ...............................................................................34
23.3 Consequences of non-compliance ......................................................................................................35
ARTICLE 24 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE COMMISSION ..........35
CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES ....................................... 35
ARTICLE 25 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES ...........................35
25.1 Roles and responsibilities towards the Commission ......................................................................... 35
25.2 Internal division of roles and responsibilities ....................................................................................35
25.3 Internal arrangements between beneficiaries — Consortium agreement ...........................................36
CHAPTER 6 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY — SANCTIONS
— DAMAGES — SUSPENSION — TERMINATION — FORCE MAJEURE ............................... 37
SECTION 1 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY —
SANCTIONS .............................................................................................................................................37
ARTICLE 26 — REJECTION OF INELIGIBLE COSTS .............................................................................37
26.1 Conditions ...........................................................................................................................................37
26.2 Ineligible costs to be rejected — Calculation — Procedure ..............................................................37
26.3 Effects .................................................................................................................................................37
ARTICLE 27 — REDUCTION OF THE GRANT ........................................................................................ 37
27.1 Conditions ...........................................................................................................................................38
27.2 Amount to be reduced — Calculation — Procedure .........................................................................38
27.3 Effects .................................................................................................................................................38
ARTICLE 28 — RECOVERY OF UNDUE AMOUNTS ..............................................................................38
28.1 Amount to be recovered — Calculation — Procedure ......................................................................38
ARTICLE 29 — ADMINISTRATIVE SANCTIONS .................................................................................... 41
SECTION 2 LIABILITY FOR DAMAGES ........................................................................................................ 41
ARTICLE 30 — LIABILITY FOR DAMAGES ............................................................................................41
30.1 Liability of the Commission .............................................................................................................. 41
30.2 Liability of the beneficiaries ..............................................................................................................41
SECTION 3 SUSPENSION AND TERMINATION ............................................................................................41
ARTICLE 31 — SUSPENSION OF PAYMENT DEADLINE ......................................................................41
31.1 Conditions ...........................................................................................................................................41
6
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
31.2 Procedure ............................................................................................................................................ 41
ARTICLE 32 — SUSPENSION OF PAYMENTS ........................................................................................ 42
32.1 Conditions ...........................................................................................................................................42
32.2 Procedure ............................................................................................................................................ 42
ARTICLE 33 — SUSPENSION OF THE ACTION IMPLEMENTATION ..................................................43
33.1 Suspension of the action implementation, by the beneficiaries .........................................................43
33.2 Suspension of the action implementation, by the Commission .........................................................43
ARTICLE 34 — TERMINATION OF THE AGREEMENT OR OF THE PARTICIPATION OF ONE OR
MORE BENEFICIARIES ............................................................................................................ 44
34.1 Termination of the Agreement, by the beneficiaries ......................................................................... 45
34.2 Termination of the participation of one or more beneficiaries, by the beneficiaries ..........................45
34.3 Termination of the Agreement or of the participation of one or more beneficiaries, by the
Commission ........................................................................................................................................ 46
SECTION 4 FORCE MAJEURE ..........................................................................................................................49
ARTICLE 35 — FORCE MAJEURE .............................................................................................................49
CHAPTER 7 FINAL PROVISIONS .......................................................................................................................... 50
ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES ............................................................. 50
36.1 Form and means of communication .................................................................................................. 50
36.2 Date of communication ......................................................................................................................50
36.3 Addresses for communication ............................................................................................................51
ARTICLE 37 — INTERPRETATION OF THE AGREEMENT ................................................................... 51
37.1 Precedence of the Terms and Conditions over the Annexes ............................................................. 51
37.2 Privileges and immunities ..................................................................................................................51
ARTICLE 38 — CALCULATION OF PERIODS, DATES AND DEADLINES .......................................... 51
ARTICLE 39 — AMENDMENTS TO THE AGREEMENT ........................................................................ 51
39.1 Conditions ...........................................................................................................................................51
39.2 Procedure ............................................................................................................................................ 52
ARTICLE 40 — ACCESSION TO THE AGREEMENT .............................................................................. 52
40.1 Accession of the beneficiaries mentioned in the Preamble ............................................................... 52
40.2 Addition of new beneficiaries ............................................................................................................53
ARTICLE 41 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES ............................................. 53
41.1 Applicable law ................................................................................................................................... 53
41.2 Dispute settlement .............................................................................................................................. 53
ARTICLE 42 — ENTRY INTO FORCE OF THE AGREEMENT ............................................................... 54
7
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
CHAPTER 1 GENERAL
ARTICLE 1 — SUBJECT OF THE AGREEMENT
This Agreement sets out the rights and obligations and the terms and conditions applicable to the grant
awarded to the beneficiaries for implementing the action set out in Chapter 2.
CHAPTER 2 ACTION
ARTICLE 2 — ACTION TO BE IMPLEMENTED
The grant is awarded for the action entitled ‘Enhancing Barnahus model service delivery in
Estonia, Latvia and Poland — BADEV’ (‘action’), as described in Annex 1.
ARTICLE 3 — DURATION AND STARTING DATE OF THE ACTION
The duration of the action will be 24 months as of 01/02/2018 (‘starting date of the action’).
ARTICLE 4 — ESTIMATED BUDGET AND BUDGET TRANSFERS
4.1 Estimated budget
The ‘estimated budget’ for the action is set out in Annex 2.
It contains the estimated eligible costs and the forms of costs, broken down by beneficiary and budget
category (see Articles 5, 6).
4.2 Budget transfers
The estimated budget breakdown indicated in Annex 2 may be adjusted — without an amendment
(see Article 39) — by transfers of amounts between beneficiaries, budget categories and/or forms of
costs set out in Annex 2, if the action is implemented as described in Annex 1.
However :
- the beneficiaries may not add costs relating to subcontracts not provided for in Annex 1, unless
such additional subcontracts are approved by an amendment or in accordance with Article 10;
- the transfers between budget categories must stay below 20% of the total costs for the action
set out in Annex 2, unless they are approved by an amendment.
CHAPTER 3 GRANT
ARTICLE 5 — GRANT AMOUNT, FORM OF GRANT, REIMBURSEMENT RATE AND
FORMS OF COSTS
5.1 Maximum grant amount
8
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
The ‘maximum grant amount’ is EUR 292,764.60 (two hundred and ninety two thousand seven
hundred and sixty four EURO and sixty eurocents).
5.2 Form of grant, reimbursement rate and forms of costs
The grant reimburses 80% of the action’s eligible costs (see Article 6) (‘reimbursement of eligible
costs grant’) (see Annex 2).
The estimated eligible costs of the action are EUR 365,957.12 (three hundred and sixty five thousand
nine hundred and fifty seven EURO and twelve eurocents).
Eligible costs (see Article 6) must be declared under the following forms ('forms of costs' or ‘cost
forms’):
(a) for direct personnel costs: as actually incurred costs (‘actual costs’)
(b) for direct travel and subsistence costs: as actually incurred costs (actual costs);
(c) for direct costs of subcontracting: as actually incurred costs (actual costs);
(d) for direct costs of providing financial support to third parties: not applicable;
(e) for other direct costs: as actually incurred costs (‘actual costs’);
(f) for indirect costs: on the basis of a flat-rate applied as set out in Article 6.2.Point F (‘flat-rate
costs’);
5.3 Final grant amount — Calculation
The ‘final grant amount’ depends on the actual extent to which the action is implemented in
accordance with the Agreement’s terms and conditions.
This amount is calculated by the Commission — when the payment of the balance is made — in the
following steps:
Step 1 – Application of the reimbursement rate to the eligible costs
Step 2 – Limit to the maximum grant amount
Step 3 – Reduction due to the no-profit rule
Step 4 – Reduction due to substantial errors, irregularities or fraud or serious breach of obligations
5.3.1 Step 1 — Application of the reimbursement rate to the eligible costs
The reimbursement rate (see Article 5.2) is applied to the eligible costs (actual costs and flat-rate
costs; see Article 6) declared by the beneficiaries (see Article 15) and approved by the Commission
(see Article 16).
5.3.2 Step 2 — Limit to the maximum grant amount
9
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
If the amount obtained following Step 1 is higher than the maximum grant amount set out in
Article 5.1, it will be limited to the latter.
5.3.3 Step 3 — Reduction due to the no-profit rule
The grant must not produce a profit.
‘Profit’ means the surplus of the amount obtained following Steps 1 and 2 plus the action’s total
receipts, over the action’s total eligible costs.
The ‘action’s total eligible costs’ are the consolidated total eligible costs approved by the
Commission.
The ‘action’s total receipts’ are the consolidated total receipts generated during its duration (see
Article 3).
The following are considered receipts:
(a) income generated by the action;
(b) financial contributions given by third parties to the beneficiary, specifically to be used for costs
that are eligible under the action.
The following are however not considered receipts:
(a) financial contributions by third parties, if they may be used to cover costs other than the eligible
costs (see Article 6);
(b) financial contributions by third parties with no obligation to repay any amount unused at the
end of the period set out in Article 3.
If there is a profit, it will be deducted in proportion to the final rate of reimbursement of the eligible
actual costs approved by the Commission (as compared to the amount calculated following Steps 1
and 2).
5.3.4 Step 4 — Reduction due to substantial errors, irregularities or fraud or serious breach of
obligations
If the grant is reduced (see Article 27), the Commission will calculate the reduced grant amount
by deducting the amount of the reduction (calculated in proportion to the seriousness of the errors,
irregularities or fraud or breach of obligations, in accordance with Article 27.2) from the maximum
grant amount set out in Article 5.1.
The final grant amount will be the lower of the following two:
- the amount obtained following Steps 1 to 3 or
- the reduced grant amount following Step 4.
5.4 Revised final grant amount — Calculation
If — after the payment of the balance (in particular, after checks, reviews, audits or investigations;
10
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
see Article 17) — the Commission rejects costs (see Article 26) or reduces the grant (see Article 27),
it will calculate the ‘revised final grant amount’ for the action or for the beneficiary concerned.
This amount is calculated by the Commission on the basis of the findings, as follows:
- in case of rejection of costs: by applying the reimbursement rate to the revised eligible costs
approved by the Commission for the beneficiary concerned;
- in case of reduction of the grant: by deducting the amount of the reduction (calculated in
proportion to the seriousness of the substantial errors, irregularities or fraud or breach of
obligations, in accordance with Article 27.2) from the maximum grant amount set out in
Article 5.1 or from the maximum EU contribution indicated for the beneficiary in the estimated
budget (see Annex 2).
In case of rejection of costs and reduction of the grant, the revised final grant amount will be the
lower of the two amounts above.
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS
6.1 General conditions for costs to be eligible
‘Eligible costs’ are costs that meet the following criteria:
(a) for actual costs:
(i) they must be actually incurred by the beneficiary;
(ii) they must be incurred in the period set out in Article 3, with the exception of costs relating
to the submission of the final report (see Article 15);
(iii) they must be indicated in the estimated budget set out in Annex 2;
(iv) they must be incurred in connection with the action as described in Annex 1 and necessary
for its implementation;
(v) they must be identifiable and verifiable, in particular recorded in the beneficiary’s accounts
in accordance with the accounting standards applicable in the country where the beneficiary
is established and with the beneficiary’s usual cost accounting practices;
(vi) they must comply with the applicable national law on taxes, labour and social security, and
(vii) they must be reasonable, justified and must comply with the principle of sound financial
management, in particular regarding economy and efficiency;
(b) for unit costs: not applicable;
(c) for flat-rate costs:
(i) they must be calculated by applying the flat-rate set out in Annex 2, and
11
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
(ii) the costs (actual costs) to which the flat-rate is applied must comply with the conditions for
eligibility set out in this Article;
(d) for lump sum costs: not applicable.
6.2 Specific conditions for costs to be eligible
Costs are eligible if they comply with the general conditions (see above) and the specific conditions
set out below, for each of the following budget categories:
A. direct personnel costs;
B. direct travel and subsistence costs;
C. direct costs of subcontracting;
D. not applicable;
E. other direct costs.
F. indirect costs.
‘Direct costs’ are costs that are directly linked to the action implementation and can therefore be
attributed to it directly. They must not include any indirect costs (see Point F below).
‘Indirect costs’ are costs that are not directly linked to the action implementation and therefore cannot
be attributed directly to it.
A. Direct personnel costs
Types of eligible personnel costs
A.1 Personnel costs are eligible if they are related to personnel working for the beneficiary under
an employment contract (or equivalent appointing act) and assigned to the action (‘costs for
employees (or equivalent)’). They must be limited to salaries, social security contributions, taxes
and other costs included in the remuneration, if they arise from national law or the employment
contract (or equivalent appointing act).
They may also include additional remuneration for personnel assigned to the action (including
payments on the basis of supplementary contracts regardless of their nature), if:
(a) it is part of the beneficiary’s usual remuneration practices and is paid in a consistent manner
whenever the same kind of work or expertise is required;
(b) the criteria used to calculate the supplementary payments are objective and generally
applied by the beneficiary, regardless of the source of funding used.
A.2 The costs for natural persons working under a direct contract with the beneficiary other than
an employment contract or seconded by a third party against payment are eligible personnel
costs, if:
(a) the person works under the beneficiary’s instructions and, unless otherwise agreed with
the beneficiary, on the beneficiary’s premises;
(b) the result of the work carried out belongs to the beneficiary, and
12
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
(c) the costs are not significantly different from those for personnel performing similar tasks
under an employment contract with the beneficiary.
Calculation
Personnel costs must be calculated by the beneficiaries as follows:
{hourly rate
multiplied by
number of actual hours worked on the action}.
The number of actual hours declared for a person must be identifiable and verifiable (see Article 13).
The total number of hours declared in EU or Euratom grants, for a person for a year, cannot be higher
than the annual productive hours used for the calculations of the hourly rate. Therefore, the maximum
number of hours that can be declared for the grant are:
{number of annual productive hours for the year (see below)
minus
total number of hours declared by the beneficiary, for that person for that year, for other EU or Euratom grants}.
The ‘hourly rate’ is the calculated as follows:
{actual annual personnel costs for the person
divided by
number of individual annual productive hours}.
using the personnel costs and the number of annual productive hours for each full financial year
covered by the reporting period concerned. If a financial year is not closed at the end of the reporting
period, the beneficiaries must use the hourly rate of the last closed financial year available.
The ‘number of individual annual productive hours’ is the total actual hours worked by the person in
the year. It may not include holidays and other absences (such as sick leave, maternity leave, special
leave, etc). However, it may include overtime and hours spent in meetings, trainings and other similar
activities.
B. Direct travel and subsistence costs
Travel and subsistence costs (including related duties, taxes and charges, such as non-deductible
value added tax (VAT) paid by beneficiaries that are not public bodies acting as public authority) are
eligible if they are in line with the beneficiary’s usual practices on travel.
C. Direct costs of subcontracting (including related duties, taxes and charges, such as non-deductible
value added tax (VAT) paid by beneficiaries that areis not public bodies acting as public authority)
are eligible if the conditions in Article 10.1.1 are met.
D. Direct costs of providing financial support to third parties
13
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
Not applicable
E. Other direct costs
E.1 The depreciation costs of equipment, infrastructure or other assets (new or second-hand)
as recorded in the beneficiary’s accounts are eligible, if they were purchased in accordance
with Article 9.1.1 and written off in accordance with international accounting standards and the
beneficiary’s usual accounting practices.
The costs of renting or leasing equipment, infrastructure or other assets (including related duties,
taxes and charges, such as non-deductible value added tax (VAT) paid by beneficiaries that are not
public bodies acting as public authority) are also eligible, if they do not exceed the depreciation
costs of similar equipment, infrastructure or assets and do not include any financing fees.
The only portion of the costs that will be taken into account is that which corresponds to the
duration of the action and rate of actual use for the purposes of the action.
E.2 Costs of other goods and services (including related duties, taxes and charges, such as non-
deductible value added tax (VAT) paid by beneficiaries that are not public bodies acting as public
authority) are eligible, if they are purchased specifically for the action and in accordance with
Article 9.1.1.
Such goods and services include, for instance, consumables and supplies, dissemination,
protection of results, certificates on the financial statements (if they are required by the
Agreement), translations and publications.
F. Indirect costs
Indirect costs are eligible if they are declared on the basis of the flat-rate of 7% of the eligible direct
costs (see Article 5.2 and Points A to E above).
Beneficiaries receiving an operating grant1 financed by the EU or Euratom budget cannot declare
indirect costs for the period covered by the operating grant.
6.3 Conditions for costs of affiliated entities to be eligible
Not applicable
6.4 Ineligible costs
‘Ineligible costs’ are:
(a) costs that do not comply with the conditions set out above (Article 6.1 to 6.3), in particular:
1 For the definition, see Article 121(1)(b) of Regulation (EU, Euratom) No 966/2012 of the European Parliament and
of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing
Council Regulation (EC, Euratom) No 1605/2002 (OJ L 218, 26.10.2012, p.1) (‘Financial Regulation No 966/2012’):
‘operating grant’ means direct financial contribution, by way of donation, from the budget in order to finance the
functioning of a body which pursues an aim of general EU interest or has an objective forming part of and supporting
an EU policy.
14
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
(i) costs related to return on capital;
(ii) debt and debt service charges;
(iii) provisions for future losses or debts;
(iv) interest owed;
(v) doubtful debts;
(vi) currency exchange losses;
(vii) bank costs charged by the beneficiary’s bank for transfers from the Commission;
(viii)excessive or reckless expenditure;
(ix) deductible VAT;
(x) costs incurred during suspension of the implementation of the action (see Article 33);
(xi) in-kind contributions provided by third parties;
(b) costs declared under another EU or Euratom grant (including grants awarded by a Member
State and financed by the EU or Euratom budget and grants awarded by bodies other than the
Commission for the purpose of implementing the EU or Euratom budget); in particular, indirect
costs if the beneficiary is already receiving an operating grant financed by the EU or Euratom
budget in the same period;
(c) costs for staff of a national (or local) administration, for activities that are part of the
administration’s normal activities (i.e. not undertaken only because of the grant);
(d) costs (especially travel and subsistence costs) for staff or representatives of EU institutions,
bodies or agencies;
(e) costs for activities that do not take place in one of the eligible countries set out in the call for
proposals — unless approved by the Commission.
6.5 Consequences of declaration of ineligible costs
Declared costs that are ineligible will be rejected (see Article 26).
This may also lead to any of the other measures described in Chapter 6.
CHAPTER 4 RIGHTS AND OBLIGATIONS OF THE PARTIES
SECTION 1 RIGHTS AND OBLIGATIONS RELATED TO IMPLEMENTING THE
ACTION
ARTICLE 7 — GENERAL OBLIGATION TO PROPERLY IMPLEMENT THE ACTION
15
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
7.1 General obligation to properly implement the action
The beneficiaries must implement the action as described in Annex 1 and in compliance with the
provisions of the Agreement and all legal obligations under applicable EU, international and national
law.
7.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD PARTY
INVOLVED IN THE ACTION
The beneficiaries must have the appropriate resources to implement the action.
If it is necessary to implement the action, the beneficiaries may:
- purchase goods, works and services (see Article 9);
- call upon subcontractors to implement action tasks described in Annex 1 (see Article 10).
In these cases, the beneficiaries retain sole responsibility towards the Commission and the other
beneficiaries for implementing the action.
ARTICLE 8a — IMPLEMENTATION OF ACTION TASKS BY BENEFICIARIES NOT
RECEIVING EU FUNDING
Not applicable
ARTICLE 9 — PURCHASE OF GOODS, WORKS OR SERVICES
9.1 Rules for purchasing goods, works or services
9.1.1 If necessary to implement the action, the beneficiaries may purchase goods, works or services.
The beneficiaries must make such purchases ensuring the best value for money or, if appropriate, the
lowest price. In doing so, they must avoid any conflict of interests (see Article 20).
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the
European Anti-Fraud Office (OLAF) can exercise their rights under Articles 17 and 18 also towards
their contractors.
16
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
9.1.2 Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC2 (or
2014/24/EU3) or ‘contracting entities’ within the meaning of Directive 2004/17/EC4 (or 2014/25/EU5)
must comply with the applicable national law on public procurement.
9.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under Article 9.1.1, the costs related to the contract
concerned will be ineligible (see Article 6) and will be rejected (see Article 26).
If a beneficiary breaches any of its obligations under Article 9.1.2, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 10 — IMPLEMENTATION OF ACTION TASKS BY SUBCONTRACTORS
10.1 Rules for subcontracting action tasks
10.1.1 If necessary to implement the action, the beneficiaries may award subcontracts covering the
implementation of certain action tasks described in Annex 1.
Subcontracting may cover only a limited part of the action.
The beneficiaries must award the subcontracts ensuring the best value for money or, if appropriate,
the lowest price. In doing so, they must avoid any conflict of interests (see Article 20).
The tasks to be implemented and the estimated cost for each subcontract must be set out in Annex 1 and
the total estimated costs of subcontracting per beneficiary must be set out in Annex 2. The Commission
may however approve subcontracts not set out in Annex 1 and 2 without amendment (see Article 39),
if:
- they are specifically justified in the technical report and
- they do not entail changes to the Agreement which would call into question the decision
awarding the grant or breach the principle of equal treatment of applicants.
The beneficiaries must ensure that the subcontracted work is performed in one of the eligible countries
set out in the call for proposals (‘place of performance obligation’) — unless otherwise approved by
the Commission.
2 Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of
procedures for the award of public work contracts, public supply contracts and public service contracts (OJ L 134,
30.04.2004, p. 114).
3 Directive 2014/24/EU of the European Parliament and of the Council of 26 February 2014 on public procurement and
repealing Directive 2004/18/EC (OJ L 94, 28.3.2014, p. 65).
4 Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the procurement
procedures of entities operating in the water, energy, transport and postal services sectors (OJ L 134, 30.04.2004, p. 1).
5 Directive 2014/25/EU of the European Parliament and of the Council of 26 February 2014 on procurement by entities
operating in the water, energy, transport and postal services sectors and repealing Directive 2004/17/EC (OJ L 94,
28.3.2014, p. 243).
17
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the
European Anti-Fraud Office (OLAF) can exercise their rights under Articles 17 and 18 also towards
their subcontractors.
10.1.2 The beneficiaries must ensure that their obligations under Articles 20, 21, 22 and 30 also apply
to the subcontractors.
Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC (or
2014/24/EU) or ‘contracting entities’ within the meaning of Directive 2004/17/EC (or 2014/25/EU)
must comply with the applicable national law on public procurement.
10.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under Article 10.1.1, the costs related to the subcontract
concerned will be ineligible (see Article 6) and will be rejected (see Article 26).
If a beneficiary breaches any of its obligations under Article 10.1.2, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 11 — IMPLEMENTATION OF ACTION TASKS BY AFFILIATED ENTITIES
Not applicable
ARTICLE 11a — FINANCIAL SUPPORT TO THIRD PARTIES
11a.1 Rules for providing financial support to third parties
Not applicable
11a.2 Financial support in the form of prizes
Not applicable
11a.3 Consequences of non-compliance
Not applicable
SECTION 2 RIGHTS AND OBLIGATIONS RELATED TO THE GRANT
ADMINISTRATION
ARTICLE 12 — GENERAL OBLIGATION TO INFORM
12.1 General obligation to provide information upon request
The beneficiaries must provide — during implementation of the action or afterwards and in accordance
with article 25.2 — any information requested in order to verify eligibility of the costs, proper
implementation of the action and compliance with the other obligations under the Agreement.
18
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
12.2 Obligation to keep information up to date and to inform about events and circumstances
likely to affect the Agreement
Each beneficiary must keep information stored in the Participant Portal Beneficiary Register (via
the electronic exchange system; see Article 36) up to date, in particular, its name, address, legal
representatives, legal form and organisation type.
Each beneficiary must immediately inform the coordinator — which must immediately inform the
Commission and the other beneficiaries — of any of the following:
(a) events which are likely to affect significantly or delay the implementation of the action or the
EU’s financial interests, in particular:
(i) changes in its legal, financial, technical, organisational or ownership situation
(b) circumstances affecting:
(i) the decision to award the grant or
(ii) compliance with requirements under the Agreement.
12.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 13 — KEEPING RECORDS — SUPPORTING DOCUMENTATION
13.1 Obligation to keep records and other supporting documentation
The beneficiaries must — for a period of five years after the payment of the balance — keep records
and other supporting documentation in order to prove the proper implementation of the action and
the costs they declare as eligible.
They must make them available upon request (see Article 12) or in the context of checks, reviews,
audits or investigations (see Article 17).
If there are on-going checks, reviews, audits, investigations, litigation or other pursuits of claims under
the Agreement (including the extension of findings; see Articles 17), the beneficiaries must keep the
records and other supporting documentation until the end of these procedures.
The beneficiaries must keep the original documents. Digital and digitalised documents are considered
originals if they are authorised by the applicable national law. The Commission may accept non-
original documents if they considers that they offer a comparable level of assurance.
13.1.1 Records and other supporting documentation on the technical implementation
The beneficiaries must keep records and other supporting documentation on the technical
implementation of the action, in line with the accepted standards in the respective field.
19
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
13.1.2 Records and other documentation to support the costs declared
The beneficiaries must keep the records and documentation supporting the costs declared, in particular
the following:
(a) for actual costs: adequate records and other supporting documentation to prove the costs
declared, such as contracts, subcontracts, invoices and accounting records. In addition, the
beneficiaries' usual cost accounting practices and internal control procedures must enable direct
reconciliation between the amounts declared, the amounts recorded in their accounts and the
amounts stated in the supporting documentation;
(b) for unit costs: not applicable;
(c) for flat-rate costs: adequate records and other supporting documentation to prove the eligibility
of the costs to which the flat-rate is applied. The beneficiaries do not need to identify the costs
covered or provide supporting documentation (such as accounting statements) to prove the
amount declared at a flat-rate.
(d) for lump sum costs: not applicable.
In addition, for personnel costs (declared as actual costs), the beneficiaries must keep time records
for the number of hours declared. The time records must be in writing and approved by the persons
working on the action and their supervisors, at least monthly. In the absence of reliable time records
of the hours worked on the action, the Commission may accept alternative evidence supporting the
number of hours declared, if it considers that it offers an adequate level of assurance.
As an exception, for persons working exclusively on the action, there is no need to keep time records,
if the beneficiary signs a declaration confirming that the persons concerned have worked exclusively
on the action.
13.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, costs insufficiently substantiated
will be ineligible (see Article 6) and will be rejected (see Article 26), and the grant may be reduced
(see Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 14 — SUBMISSION OF DELIVERABLES
14.1 Obligation to submit deliverables
The coordinator must submit:
- a mid-term progress report on the implementation of the action, within 30 days after half of
the reporting period set out in Article 15.2 has passed;
- the ‘deliverables’ identified in Annex 1, in accordance with the timing and conditions set out
in it.
20
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
14.2 Consequences of non-compliance
If the coordinator breaches any of its obligations under this Article, the Commission may apply any
of the measures described in Chapter 6.
ARTICLE 15 — REPORTING — PAYMENT REQUESTS
15.1 Obligation to submit reports
The coordinator must submit to the Commission (see Article 36) the technical and financial report(s)
set out in this Article. This report includes the request(s) for payment and must be drawn up using the
forms and templates provided in the electronic exchange system (see Article 36).
15.2 Reporting periods
The action has one ‘reporting period’:
- RP1: from month 1 to month 24
15.2a Request(s) for further pre-financing payment(s)
Not applicable
15.3 Periodic reports — Requests for interim payments
Not applicable
15.4 Final report — Request for payment of the balance
The coordinator must submit — within 60 days following the end of the reporting period — a final
report, which includes the request for payment of the balance.
The final report must include the following:
(a) a ‘final technical report’ containing:
(i) an explanation of the work carried out by the beneficiaries;
(ii) an overview of the implementation of the action, including milestones and deliverables
identified in Annex 1.
This report must include explanations justifying the differences between work expected
to be carried out in accordance with Annex 1 and that actually carried out;
(iii) a summary for publication by the Commission;
(iv) the answers to the ‘questionnaire’: not applicable;
(b) a ‘final financial report’ containing:
21
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
(i) an ‘individual financial statement’ (see Annex 4) from each beneficiary, for the
reporting period.
The individual financial statement must detail the eligible costs (actual costs and flat-rate
costs; see Article 6) for each budget category (see Annex 2).
The beneficiaries must declare all eligible costs, even if — for actual costs and flat-
rate costs — they exceed the amounts indicated in the estimated budget (see Annex 2).
Amounts which are not declared in the individual financial statement will not be taken
into account by the Commission.
The individual financial statements must also detail the receipts of the action (see
Article 5.3.3).
Each beneficiary must certify that:
- the information provided is full, reliable and true;
- the costs declared are eligible (see Article 6);
- the costs can be substantiated by adequate records and supporting documentation
(see Article 13) that will be produced upon request (see Article 12) or in the context
of checks, reviews, audits and investigations (see Article 17), and
- that all the receipts have been declared (see Article 5.3.3);
(ii) an explanation of the use of resources and the information on subcontracting (see
Article 10) from each beneficiary, for the reporting period concerned;
(iii) not applicable;
(iv) a ‘final summary financial statement’, created automatically by the electronic exchange
system, consolidating the individual financial statement(s) for the reporting period and
including the request for payment of the balance;
(v) a ‘certificate on the financial statements’ (drawn up in accordance with Annex 5) for
each beneficiary, if:
- it requests an EU contribution of EUR 325 000 or more as reimbursement of actual
costs and
- the maximum EU contribution indicated, for that beneficiary, in the estimated
budget (see Annex 2) as reimbursement of actual costs is EUR 750 000 or more.
15.5 Information on cumulative expenditure incurred
Not applicable
15.6 Currency for financial statements and conversion into euro
22
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
Financial statements must be drafted in euro.
Beneficiaries with accounting established in a currency other than the euro must convert the costs
recorded in their accounts into euro, at the average of the daily exchange rates published in the C series
of the Official Journal of the European Union, calculated over the corresponding reporting period.
If no daily euro exchange rate is published in the Official Journal of the European Union for the
currency in question, they must be converted at the average of the monthly accounting rates published
on the Commission’s website, calculated over the corresponding reporting period.
Beneficiaries with accounting established in euro must convert costs incurred in another currency into
euro according to their usual accounting practices.
15.7 Language of reports
All report(s) (including financial statements) must be submitted in the language of the Agreement.
15.8 Consequences of non-compliance
If the report(s) submitted do not comply with this Article, the Commission may suspend the payment
deadline (see Article 31) and apply any of the other measures described in Chapter 6.
If the coordinator breaches its obligation to submit the report(s) and if it fails to comply with this
obligation within 30 days following a written reminder, the Commission may terminate the Agreement
(see Article 34) or apply any of the other measures described in Chapter 6.
ARTICLE 16 — PAYMENTS AND PAYMENT ARRANGEMENTS
16.1 Payments to be made
The following payments will be made to the coordinator:
- a pre-financing payment;
- one payment of the balance, on the basis of the request for payment of the balance (see
Article 15).
16.2 Pre-financing payment(s) — Amount
The aim of the pre-financing is to provide the beneficiaries with a float.
It remains the property of the EU until the payment of the balance.
The amount of the pre-financing payment will be EUR 234,211.68 (two hundred and thirty four
thousand two hundred and eleven EURO and sixty eight eurocents).
The Commission will — except if Article 32 applies — make the pre-financing payment to the
coordinator within 30 days from the accession of all beneficiaries to the Agreement (see Article 40).
16.3 Interim payments — Amount — Calculation
23
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
Not applicable
16.4 Payment of the balance — Amount — Calculation
The payment of the balance reimburses the remaining part of the eligible costs incurred by the
beneficiaries for the implementation of the action.
If the total amount of earlier payments is greater than the final grant amount (see Article 5.3), the
payment of the balance takes the form of a recovery (see Article 28).
If the total amount of earlier payments is lower than the final grant amount, the Commission will pay
the balance within 90 days from receiving the final report (see Article 15.4), except if Articles 31
or 32 apply.
Payment is subject to the approval of the final report. Its approval does not imply recognition of
compliance, authenticity, completeness or correctness of its content.
The amount due as the balance is calculated by the Commission by deducting the total amount of
pre-financing and interim payments (if any) already made, from the final grant amount determined
in accordance with Article 5.3:
{final grant amount (see Article 5.3)
minus
{pre-financing and interim payments (if any) made}}.
If the balance is positive, it will be paid to the coordinator.
The amount to be paid may however be offset — without the beneficiaries’ consent — against any
other amount owed by a beneficiary to the Commission or an executive agency (under the EU or
Euratom budget), up to the maximum EU contribution indicated, for that beneficiary, in the estimated
budget (see Annex 2).
If the balance is negative, it will be recovered from the coordinator (see Article 28).
16.5 Notification of amounts due
When making payments, the Commission will formally notify to the coordinator the amount due,
specifying that it concerns the payment of the balance.
For the payment of the balance, the notification will also specify the final grant amount.
In the case of reduction of the grant or recovery of undue amounts, the notification will be preceded
by the contradictory procedure set out in Articles 27 and 28.
16.6 Currency for payments
The Commission will make all payments in euro.
16.7 Payments to the coordinator — Distribution to the beneficiaries
24
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
Payments will be made to the coordinator.
Payments to the coordinator will discharge the Commission from its payment obligation.
The coordinator must distribute the payments between the beneficiaries without unjustified delay.
16.8 Bank account for payments
All payments will be made to the following bank account:
Name of bank: AS SEB PANK
Full name of the account holder: RAHANDUSMINISTEERIUM
Full account number (including bank codes):
IBAN code: EE221010220027690221
16.9 Costs of payment transfers
The cost of the payment transfers is borne as follows:
- the Commission bears the cost of transfers charged by its bank;
- the beneficiary bears the cost of transfers charged by its bank;
- the party causing a repetition of a transfer bears all costs of the repeated transfer.
16.10 Date of payment
Payments by the Commission are considered to have been carried out on the date when they are
debited to its account.
16.11 Consequences of non-compliance
16.11.1 If the Commission does not pay within the payment deadlines (see above), the beneficiaries
are entitled to late-payment interest at the rate applied by the European Central Bank (ECB) for its
main refinancing operations in euros (‘reference rate’), plus three and a half points. The reference rate
is the rate in force on the first day of the month in which the payment deadline expires, as published
in the C series of the Official Journal of the European Union.
If the late-payment interest is lower than or equal to EUR 200, it will be paid to the coordinator only
upon request submitted within two months of receiving the late payment.
Late-payment interest is not due if all beneficiaries are EU Member States (including regional and
local government authorities or other public bodies acting on behalf of a Member State for the purpose
of this Agreement).
Suspension of the payment deadline or payments (see Articles 31 and 32) will not be considered as
late payment.
Late-payment interest covers the period running from the day following the due date for payment (see
above), up to and including the date of payment.
25
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
Late-payment interest is not considered for the purposes of calculating the final grant amount.
16.11.2 If the coordinator breaches any of its obligations under this Article, the grant may be reduced
(see Article 27) and the Agreement or the participation of the coordinator may be terminated (see
Article 34).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 17 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION
OF FINDINGS
17.1 Checks, reviews and audits by the Commission
17.1.1 Right to carry out checks
The Commission will — during the implementation of the action or afterwards — check the proper
implementation of the action and compliance with the obligations under the Agreement, including
assessing deliverables and reports.
For this purpose, the Commission may be assisted by external persons or bodies.
The Commission may also request additional information in accordance with Article 12. The
Commission may request the beneficiaries to provide such information to it directly.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
17.1.2 Right to carry out reviews
The Commission may — during the implementation of the action or afterwards — carry out reviews
on the proper implementation of the action (including assessment of deliverables and reports) and
compliance with the obligations under the Agreement.
Reviews may be started up to five years after the payment of the balance. They will be formally
notified to the coordinator or beneficiary concerned and will be considered to have started on the date
of the formal notification.
If the review is carried out on a third party (see Articles 9 to 11a), the beneficiary concerned must
inform the third party.
The Commission may carry out reviews directly (using its own staff) or indirectly (using external
persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned of the
identity of the external persons or bodies. They have the right to object to the appointment on grounds
of commercial confidentiality.
The coordinator or beneficiary concerned must provide — within the deadline requested — any
information and data in addition to deliverables and reports already submitted (including information
on the use of resources). The Commission may request beneficiaries to provide such information to
it directly.
26
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
The coordinator or beneficiary concerned may be requested to participate in meetings, including with
external experts.
For on-the-spot reviews, the beneficiaries must allow access to their sites and premises, including to
external persons or bodies, and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
On the basis of the review findings, a ‘review report’ will be drawn up.
The Commission will formally notify the review report to the coordinator or beneficiary concerned,
which has 30 days to formally notify observations (‘contradictory review procedure’).
Reviews (including review reports) are in the language of the Agreement.
17.1.3 Right to carry out audits
The Commission may — during the implementation of the action or afterwards — carry out audits on
the proper implementation of the action and compliance with the obligations under the Agreement.
Audits may be started up to five years after the payment of the balance. They will be formally
notified to the coordinator or beneficiary concerned and will be considered to have started on the date
of the formal notification.
If the audit is carried out on a third party (see Articles 9 to 11a), the beneficiary concerned must inform
the third party.
The Commission may carry out audits directly (using its own staff) or indirectly (using external
persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned of the
identity of the external persons or bodies. They have the right to object to the appointment on grounds
of commercial confidentiality.
The coordinator or beneficiary concerned must provide — within the deadline requested — any
information (including complete accounts, individual salary statements or other personal data) to
verify compliance with the Agreement. The Commission may request beneficiaries to provide such
information to it directly.
For on-the-spot audits, the beneficiaries must allow access to their sites and premises, including to
external persons or bodies, and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
On the basis of the audit findings, a ‘draft audit report’ will be drawn up.
The Commission will formally notify the draft audit report to the coordinator or beneficiary concerned,
which has 30 days to formally notify observations (‘contradictory audit procedure’). This period
may be extended by the Commission in justified cases.
27
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
The ‘final audit report’ will take into account observations by the coordinator or beneficiary
concerned. The report will be formally notified to it.
Audits (including audit reports) are in the language of the Agreement.
The Commission may also access the beneficiaries’ statutory records for the periodical assessment
of flat-rate amounts.
17.2 Investigations by the European Anti-Fraud Office (OLAF)
Under Regulations No 883/20137and No 2185/968 (and in accordance with their provisions and
procedures), the European Anti-Fraud Office (OLAF) may — at any moment during implementation
of the action or afterwards — carry out investigations, including on-the-spot checks and inspections,
to establish whether there has been fraud, corruption or any other illegal activity affecting the financial
interests of the EU.
17.3 Checks and audits by the European Court of Auditors (ECA)
Under Article 287 of the Treaty on the Functioning of the European Union (TFEU) and Article 161 of
the Financial Regulation No 966/20129, the European Court of Auditors (ECA) may — at any moment
during implementation of the action or afterwards — carry out audits.
The ECA has the right of access for the purpose of checks and audits.
17.4 Checks, reviews, audits and investigations for international organisations
Not applicable
17.5 Consequences of findings in checks, reviews, audits and investigations — Extension of
findings
17.5.1 Findings in this grant
Findings in checks, reviews, audits or investigations carried out in the context of this grant may lead
to the rejection of ineligible costs (see Article 26), reduction of the grant (see Article 27), recovery of
undue amounts (see Article 28) or to any of the other measures described in Chapter 6.
Rejection of costs or reduction of the grant after the payment of the balance will lead to a revised final
grant amount (see Article 5.4).
7 Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013
concerning investigations conducted by the European Anti-Fraud Office (OLAF) and repealing Regulation (EC)
No 1073/1999 of the European Parliament and of the Council and Council Regulation (Euratom) No 1074/1999 (OJ
L 248, 18.09.2013, p. 1).
8 Council Regulation (Euratom, EC) No 2185/1996 of 11 November 1996 concerning on-the-spot checks and inspections
carried out by the Commission in order to protect the European Communities' financial interests against fraud and other
irregularities (OJ L 292, 15.11.1996, p. 2).
9 Regulation (EU, EURATOM) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on
the financial rules applicable to the general budget of the Union and repealing Council Regulation (EC, EURATOM))
No 1605/2002 (OJ L 298, 26.10.2012, p. 1).
28
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
Findings in checks, reviews, audits or investigations may lead to a request for amendment for the
modification of Annex 1 (see Article 39).
Checks, reviews, audits or investigations that find systemic or recurrent errors, irregularities, fraud or
breach of obligations may also lead to consequences in other EU or Euratom grants awarded under
similar conditions (‘extension of findings from this grant to other grants’).
Moreover, findings arising from an OLAF investigation may lead to criminal prosecution under
national law.
17.5.2 Findings in other grants
The Commission may extend findings from other grants to this grant (‘extension of findings from
other grants to this grant’), if:
(a) the beneficiary concerned is found, in other EU or Euratom grants awarded under similar
conditions, to have committed systemic or recurrent errors, irregularities, fraud or breach of
obligations that have a material impact on this grant and
(b) those findings are formally notified to the beneficiary concerned — together with the list of
grants affected by the findings — no later than five years after the payment of the balance
of this grant.
The extension of findings may lead to the rejection of costs (see Article 26), reduction of the grant
(see Article 27), recovery of undue amounts (see Article 28), suspension of payments (see Article 32),
suspension of the action implementation (see Article 33) or termination (see Article 34).
17.5.3 Procedure
The Commission will formally notify the beneficiary concerned the systemic or recurrent errors and
its intention to extend these audit findings, together with the list of grants affected.
17.5.3.1 If the findings concern eligibility of costs: the formal notification will include:
(a) an invitation to submit observations on the list of grants affected by the findings;
(b) the request to submit revised financial statements for all grants affected;
(c) the correction rate for extrapolation established by the Commission on the basis of the
systemic or recurrent errors, to calculate the amounts to be rejected, if the beneficiary
concerned:
(i) considers that the submission of revised financial statements is not possible or practicable
or
(ii) does not submit revised financial statements.
The beneficiary concerned has 90 days from receiving notification to submit observations, revised
financial statements or to propose a duly substantiated alternative correction method. This period
may be extended by the Commission in justified cases.
29
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
The Commission may then start a rejection procedure in accordance with Article 26, either on the
basis of the revised financial statements, the alternative method or the correction rate announced.
17.5.3.2 If the findings concern substantial errors, irregularities or fraud orserious breach of
obligations: the formal notification will include:
(a) an invitation to submit observations on the list of grants affected by the findings and
(b) the flat-rate the Commission intends to apply according to the principle of proportionality.
The beneficiary concerned has 90 days from receiving notification to submit observations or to
propose a duly substantiated alternative flat-rate.
The Commission may then start a reduction procedure in accordance with Article 27, either on the
basis of the alternative flat-rate or the flat-rate announced.
17.6 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, any insufficiently substantiated costs
will be ineligible (see Article 6) and will be rejected (see Article 26).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 18 — EVALUATION OF THE IMPACT OF THE ACTION
18.1 Right to evaluate the impact of the action
The Commission may carry out interim and final evaluations of the impact of the action measured
against the objective of the EU programme.
Evaluations may be started during implementation of the action and up to five years after the
payment of the balance. The evaluation is considered to start on the date of the formal notification
to the coordinator or beneficiaries.
The Commission may make these evaluations directly (using its own staff) or indirectly (using external
bodies or persons it has authorised to do so).
The coordinator or beneficiaries must provide any information relevant to evaluate the impact of the
action, including information in electronic format.
18.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the Commission may apply the
measures described in Chapter 6.
SECTION 3 OTHER RIGHTS AND OBLIGATIONS
30
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
ARTICLE 19 — PRE-EXISTING RIGHTS AND OWNERSHIP OF THE RESULTS
(INCLUDING INTELLECTUAL AND INDUSTRIAL PROPERTY
RIGHTS)
19.1 Pre-existing rights and access rights to pre-existing rights
Where industrial and intellectual property rights (including rights of third parties) exist prior to the
Agreement, the beneficiaries must establish a list of these pre-existing industrial and intellectual
property rights, specifying the owner and any persons that have a right of use.
The coordinator must — before starting the action — submit this list to the Commission.
Each beneficiary must give the other beneficiaries access to any pre-existing industrial and intellectual
property rights needed for the implementation of the action and compliance with the obligations under
the Agreement.
19.2 Ownership of results and rights of use
The results of the action (including the reports and other documents relating to it) are owned by the
beneficiaries.
The beneficiaries must give the Commission the right to use the results for their communication
activities under Article 22.
19.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
Such a breach may also lead to any of the other measures described in Chapter 6.
ARTICLE 20 — CONFLICT OF INTERESTS
20.1 Obligation to avoid a conflict of interests
The beneficiaries must take all measures to prevent any situation where the impartial and objective
implementation of the action is compromised for reasons involving economic interest, political or
national affinity, family or emotional ties or any other shared interest (‘conflict of interests’).
They must formally notify to the Commission without delay any situation constituting or likely to
lead to a conflict of interests and immediately take all the necessary steps to rectify this situation.
The Commission may verify that the measures taken are appropriate and may require additional
measures to be taken by a specified deadline.
20.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27) and the Agreement may be terminated (see Article 34).
31
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 21 — CONFIDENTIALITY
21.1 General obligation to maintain confidentiality
During implementation of the action and for five years after the payment of the balance, the
parties must keep confidential any data, documents or other material (in any form) that is identified
as confidential at the time it is disclosed (‘confidential information’).
They may use confidential information to implement the Agreement.
The confidentiality obligations no longer apply if:
(a) the disclosing party agrees to release the other party;
(b) the information becomes generally and publicly available, without breaching any
confidentiality obligation;
(c) the disclosure of the confidential information is required by EU or national law.
21.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 22 — PROMOTING THE ACTION — VISIBILITY OF EU FUNDING
22.1 Communication activities by the beneficiaries
22.1.1 General obligation to promote the action and its results
The beneficiaries must promote the action and its results.
22.1.2 Information on EU funding — Obligation and right to use the EU emblem
Unless the Commission requests or agrees otherwise, any communication activity related to the action
(including at conferences, seminars, in information material, such as brochures, leaflets, posters,
presentations, etc., in electronic form, via social media, etc.) and any infrastructure, equipment or
major result funded by the grant must:
- display the EU emblem and
- include the following text:
“This [insert appropriate description, e.g. report, publication, conference, infrastructure, equipment, insert
type of result, etc.] was funded by the European Union’s Rights, Equality and Citizenship Programme
(2014-2020).”
When displayed in association with another logo, the EU emblem must have appropriate prominence.
32
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
For the purposes of their obligations under this Article, the beneficiaries may use the EU emblem
without first obtaining approval from the Commission.
This does not, however, give them the right to exclusive use.
Moreover, they may not appropriate the EU emblem or any similar trademark or logo, either by
registration or by any other means.
22.1.3 Disclaimer excluding Commission responsibility
Any communication activity related to the action must indicate the following disclaimer:
“The content of this [insert appropriate description, e.g. report, publication, conference, etc.] represents the
views of the author only and is his/her sole responsibility. The European Commission does not accept any
responsibility for use that may be made of the information it contains.”
22.2 Communication activities by the Commission
22.2.1 Right to use beneficiaries’ materials, documents or information
The Commission may use information relating to the action, documents notably summaries for
publication and public deliverables as well as any other material, such as pictures or audio-visual
material received from any beneficiary (including in electronic form).
This does not change the confidentiality obligations in Article 21, which still apply.
The right to use a beneficiary’s materials, documents and information includes:
(a) use for its own purposes (in particular, making them available to persons working for the
Commission or any other EU institution, body, office or agency or body or institutions in EU
Member States; and copying or reproducing them in whole or in part, in unlimited numbers);
(b) distribution to the public (in particular, publication as hard copies and in electronic or digital
format, publication on the internet, as a downloadable or non-downloadable file, broadcasting
by any channel, public display or presentation, communicating through press information
services, or inclusion in widely accessible databases or indexes);
(c) editing or redrafting for communication and publicising activities (including shortening,
summarising, inserting other elements (such as meta-data, legends, other graphic, visual, audio
or text elements), extracting parts (e.g. audio or video files), dividing into parts, use in a
compilation);
(d) translation;
(e) giving access in response to individual requests under Regulation No 1049/200110, without
the right to reproduce or exploit;
(f) storage in paper, electronic or other form;
10 Regulation (EC) No 1049/2001 of the European Parliament and of the Council of 30 May 2001 regarding public access
to European Parliament, Council and Commission documents, OJ L 145, 31.5.2001, p. 43.
33
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
(g) archiving, in line with applicable document-management rules, and
(h) the right to authorise third parties to act on its behalf or sub-license the modes of use set out
in Points (b), (c), (d) and (f) to third parties if needed for the communication and publicising
activities of the Commission.
If the right of use is subject to rights of a third party (including personnel of the beneficiary), the
beneficiary must ensure that it complies with its obligations under this Agreement (in particular, by
obtaining the necessary approval from the third parties concerned).
Where applicable (and if provided by the beneficiaries), the Commission will insert the following
information:
“© – [year] – [name of the copyright owner]. All rights reserved. Licensed to the European Union (EU)
under conditions.”
22.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 27).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 23 — PROCESSING OF PERSONAL DATA
23.1 Processing of personal data by the Commission
Any personal data under the Agreement will be processed by the Commission under Regulation
No 45/200111 and according to the ‘notifications of the processing operations’ to the Data Protection
Officer (DPO) of the Commission (publicly accessible in the DPO register).
Such data will be processed by the ‘data controller’ of the Commission for the purposes of
implementing, managing and monitoring the Agreement or protecting the financial interests of the
EU or Euratom (including checks, reviews, audits and investigations; see Article 17).
The persons whose personal data are processed have the right to access and correct their own personal
data. For this purpose, they must send any queries about the processing of their personal data to the
data controller, via the contact point indicated in the privacy statement(s) on the Commission websites.
They also have the right to have recourse at any time to the European Data Protection Supervisor
(EDPS).
23.2 Processing of personal data by the beneficiaries
The beneficiaries must process personal data under the Agreement in compliance with applicable EU
and national law on data protection (including authorisations or notification requirements).
11 Regulation (EC) No 45/2001 of the European Parliament and of the Council of 18 December 2000 on the protection
of individuals with regard to the processing of personal data by the Community institutions and bodies and on the free
movement of such data (OJ L 8, 12.01.2001, p. 1).
34
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
The beneficiaries may grant their personnel access only to data that is strictly necessary for
implementing, managing and monitoring the Agreement.
The beneficiaries must inform the personnel whose personal data are collected and processed by the
Commission. For this purpose, they must provide them with the privacy statement(s) (see above),
before transmitting their data to the Commission.
23.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under Article 23.2, the Commission may apply any of
the measures described in Chapter 6.
ARTICLE 24 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE
COMMISSION
The beneficiaries may not assign any of their claims for payment against the Commission to any
third party, except if approved by the Commission on the basis of a reasoned, written request by the
coordinator (on behalf of the beneficiary concerned).
If the Commission has not accepted the assignment or the terms of it are not observed, the assignment
will have no effect on it.
In no circumstances will an assignment release the beneficiaries from their obligations towards the
Commission.
CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES
ARTICLE 25 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES
25.1 Roles and responsibilities towards the Commission
The beneficiaries have full responsibility for implementing the action and complying with the
Agreement.
The beneficiaries are jointly and severally liable for the technical implementation of the action as
described in Annex 1. If a beneficiary fails to implement its part of the action, the other beneficiaries
become responsible for implementing this part (without being entitled to any additional EU funding
for doing so), unless the Commission expressly relieves them of this obligation.
The financial responsibility of each beneficiary is governed by Articles 28, 29 and 30.
25.2 Internal division of roles and responsibilities
The internal roles and responsibilities of the beneficiaries are divided as follows:
(a) Each beneficiary must:
(i) keep information stored in the Participant Portal Beneficiary Register (via the electronic
exchange system) up to date (see Article 12);
35
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
(ii) inform the coordinator immediately of any events or circumstances likely to affect
significantly or delay the implementation of the action (see Article 12);
(iii) submit to the coordinator in good time:
- individual financial statement(s) for itself and, if required, certificates on the
financial statement(s) (see Article 15);
- the data needed to draw up the technical report(s) (see Article 15);
- any other documents or information required by the Commission under the
Agreement, unless the Agreement requires the beneficiary to submit this
information directly.
(b) The coordinator must:
(i) monitor that the action is implemented properly (see Article 7);
(ii) act as the intermediary for all communications between the beneficiaries and the
Commission (in particular, providing the Commission with the information described in
Article 12), unless the Agreement specifies otherwise;
(iii) provide a pre-financing guarantee if requested by the Commission (see Article 16.2);
(iv) request and review any documents or information required by the Commission and verify
their completeness and correctness before passing them on to the Commission;
(v) submit the deliverables and report(s) to the Commission (see Articles 14 and 15);
(vi) ensure that all payments are made to the other beneficiaries without unjustified delay (see
Article 16);
The coordinator may not subcontract the above-mentioned tasks.
25.3 Internal arrangements between beneficiaries — Consortium agreement
The beneficiaries must have internal arrangements regarding their operation and co-ordination to
ensure that the action is implemented properly. These internal arrangements must be set out in a written
‘consortium agreement’ between the beneficiaries, which may cover:
- internal organisation of the consortium;
- management of access to the electronic exchange system;
- distribution of EU funding;
- additional rules on rights and obligations related to pre-existing rights and results (see
Article 19);
- settlement of internal disputes;
36
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
- liability, indemnification and confidentiality arrangements between the beneficiaries.
The consortium agreement must not contain any provision contrary to the Agreement.
CHAPTER 6 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY
— PENALTIES — DAMAGES — SUSPENSION — TERMINATION —
FORCE MAJEURE
SECTION 1 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY
— PENALTIES
ARTICLE 26 — REJECTION OF INELIGIBLE COSTS
26.1 Conditions
The Commission will — at the payment of the balance or afterwards — reject any costs which
are ineligible (see Article 6), in particular following checks, reviews, audits or investigations (see
Article 17).
The rejection may also be based on the extension of findings from other grants to this grant (see
Article 17.5.2).
26.2 Ineligible costs to be rejected — Calculation — Procedure
Ineligible costs will be rejected in full.
If the rejection of costs does not lead to a recovery (see Article 28), the Commission will formally
notify the coordinator or beneficiary concerned of the rejection of costs, the amounts and the reasons
why (if applicable, together with the notification of amounts due; see Article 16.5). The coordinator
or beneficiary concerned may — within 30 days of receiving notification — formally notify the
Commission of its disagreement and the reasons why.
If the rejection of costs leads to a recovery, the Commission will follow the contradictory procedure
with pre-information letter set out in Article 28.
26.3 Effects
If the Commission rejects costs at the payment of the balance, it will deduct them from the total
eligible costs declared, for the action, in the final summary financial statement (see Article 15.3 and
15.4). It will then calculate payment of the balance as set out in Article 16.3 or 16.4.
If the Commission rejects costs after the payment of the balance, it will deduct the amount rejected
from the total eligible costs declared, by the beneficiary, in the final summary financial statement. It
will then calculate the revised final grant amount as set out in Article 5.4. If the revised final grant
amount is lower than the final grant amount, the Commission will recover the difference (see Article
28).
ARTICLE 27 — REDUCTION OF THE GRANT
37
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
27.1 Conditions
The Commission may — at the payment of the balance or afterwards — reduce the grant, if:
(a) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under the Agreement or during the award procedure
(including improper implementation of the action, submission of false information,
failure to provide required information, breach of ethical principles) or
(b) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed — in other EU or Euratom grants awarded to it under similar conditions —
systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a
material impact on this grant (extension of findings from other grants to this grant; see
Article 17.5.2).
27.2 Amount to be reduced — Calculation — Procedure
The amount of the reduction will be proportionate to the seriousness of the errors, irregularities or
fraud or breach of obligations.
Before reduction of the grant, the Commission will formally notify a ‘pre-information letter’ to the
coordinator or beneficiary concerned:
- informing it of its intention to reduce the grant, the amount it intends to reduce and the reasons
why and
- inviting it to submit observations within 30 days of receiving notification
If the Commission does not receive any observations or decides to pursue reduction despite the
observations it has received, it will formally notify confirmation of the reduction (if applicable,
together with the notification of amounts due; see Article 16).
27.3 Effects
If the Commission reduces the grant at the time of the payment of the balance, it will calculate the
reduced grant amount for the action and then determine the amount due as payment of the balance
(see Articles 5.3.4 and 16.4).
If the Commission reduces the grant after the payment of the balance, it will calculate the revised
final grant amount for the action or for the beneficiary concerned (see Article 5.4). If the revised final
grant amount is lower than the final grant amount, the Commission will recover the difference (see
Article 28).
ARTICLE 28 — RECOVERY OF UNDUE AMOUNTS
28.1 Amount to be recovered — Calculation — Procedure
38
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
The Commission will — at the payment of the balance or afterwards — claim back amount that
was paid but is not due under the Agreement.
The coordinator is fully liable for repaying debts of the consortium (under the Agreement), even if it
has not been the final recipient of those amounts.
In addition, the beneficiaries (including the coordinator) are jointly and severally liable for repaying
any debts under the Agreement (including late-payment interest) — up to the maximum EU
contribution indicated, for each beneficiary, in the estimated budget (as last amended; see Annex 2).
28.1.1 Recovery at payment of the balance
If the payment of the balance takes the form of a recovery (see Article 16.4), the Commission will
formally notify a ‘pre-information letter’ to the coordinator:
- informing it of its intention to recover, the amount due as the balance and the reasons why and
- inviting the coordinator to submit observations within 30 days of receiving notification.
If no observations are submitted or the Commission decides to pursue recovery despite the
observations it has received, it will confirm the amount to be recovered and formally notify to the
coordinator a debit note with the terms and the date for payment (together with the notification of
amounts due; see Article 16.5).
If payment is not made by the date specified in the debit note, the Commission will recover the
amount:
(a) by ‘offsetting’ it — without the coordinator’s consent — against any amounts owed to the
coordinator by the Commission or an executive agency (from the EU or Euratom budget).
In exceptional circumstances, to safeguard the EU’s financial interests, the Commission may
offset before the payment date specified in the debit note;
(b) not applicable;
(c) by holding the other beneficiaries jointly and severally liable — up to the maximum EU
contribution indicated, for each beneficiary, in the estimated budget (as last amended; see
Annex 2)
(d) by taking legal action (see Article 41) or by adopting an enforceable decision under
Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the
Financial Regulation No 966/2012.
If payment is not made by the date in the debit note, the amount to be recovered (see above) will be
increased by late-payment interest at the rate set out in Article 16.11, from the day following the
payment date in the debit note, up to and including the date the Commission receives full payment
of the amount.
Partial payments will be first credited against expenses, charges and late-payment interest and then
against the principal.
39
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
Bank charges incurred in the recovery process will be borne by the beneficiary, unless
Directive 2007/64/EC applies.
28.1.2 Recovery of amounts after payment of the balance
If — after the payment of the balance — the Commission revised the final grant amount for the
action or for the beneficiary concerned (see Article 5.4), due to a rejection of costs or reduction of
the grant, and the revised final grant amount is lower than the final grant amount (see Article 5.3),
the Commission will:
- if the rejection or reduction does not concern a specific beneficiary: claim back the difference
from the coordinator (even if it has not been the final recipient of the amount in question)
or
- otherwise: claim back the difference from the beneficiary concerned.
The Commission will formally notify a pre-information letter to the coordinator or beneficiary
concerned:
- informing it of its intention to recover, the amount to be repaid and the reasons why and
- inviting it to submit observations within 30 days of receiving notification.
If no observations are submitted or the Commission decides to pursue recovery despite the
observations it has received, it will confirm the amount to be recovered and formally notify to the
coordinator or beneficiary concerned a debit note. This note will also specify the terms and the date
for payment.
If payment is not made by the date specified in the debit note, the Commission will recover the
amount:
(a) by ‘offsetting’ it — without the coordinator's or beneficiary’s consent — against any amounts
owed to the coordinator or beneficiary concerned by the Commission or an executive agency
(from the EU or Euratom budget).
In exceptional circumstances, to safeguard the EU’s financial interests, the Commission may
offset before the payment date specified in the debit note;
(b) by holding the other beneficiaries jointly and severally liable, up to the maximum EU
contribution indicated, for each beneficiary, in the estimated budget (as last amended; see
Annex 2);
(c) by taking legal action (see Article 41) or by adopting an enforceable decision under
Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the
Financial Regulation No 966/2012.
If payment is not made by the date in the debit note, the amount to be recovered (see above) will be
increased by late-payment interest at the rate set out in Article 16.11, from the day following the
date for payment in the debit note, up to and including the date the Commission receives full payment
of the amount.
40
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
Partial payments will be first credited against expenses, charges and late-payment interest and then
against the principal.
Bank charges incurred in the recovery process will be borne by the beneficiary, unless
Directive 2007/64/EC applies.
ARTICLE 29 — ADMINISTRATIVE SANCTIONS
In addition to contractual measures, the Commission may also adopt administrative sanctions under
Articles 106 and 131(4) of the Financial Regulation No 966/2012 (i.e. exclusion from future
procurement contracts, grants and expert contracts and/or financial penalties).
SECTION 2 LIABILITY FOR DAMAGES
ARTICLE 30 — LIABILITY FOR DAMAGES
30.1 Liability of the Commission
The Commission cannot be held liable for any damage caused to the beneficiaries or to third parties
as a consequence of implementing the Agreement, including for gross negligence.
The Commission cannot be held liable for any damage caused by any of the beneficiaries or third
parties involved in the action, as a consequence on implementing the Agreement.
30.2 Liability of the beneficiaries
Except in case of force majeure (see Article 35), the beneficiaries must compensate the Commission
for any damage it sustains as a result of the implementation of the action or because the action was
not implemented in full compliance with the Agreement.
SECTION 3 SUSPENSION AND TERMINATION
ARTICLE 31 — SUSPENSION OF PAYMENT DEADLINE
31.1 Conditions
The Commission may — at any moment — suspend the payment deadline (see Article 16.2 to 16.4)
if a request for payment (see Article 15) cannot be approved because:
(a) it does not comply with the provisions of the Agreement (see Article 15);
(b) the technical or financial report(s) have not been submitted or are not complete or additional
information is needed, or
(c) there is doubt about the eligibility of the costs declared in the financial statements and additional
checks, reviews, audits or investigations are necessary.
31.2 Procedure
41
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
The Commission will formally notify the coordinator of the suspension and the reasons why.
The suspension will take effect the day notification is sent by the Commission (see Article 36).
If the conditions for suspending the payment deadline are no longer met, the suspension will be lifted
— and the remaining period will resume.
If the suspension exceeds two months, the coordinator may request the Commission if the suspension
will continue.
If the payment deadline has been suspended due to the non-compliance of the technical or financial
report(s) (see Article 15) and the revised report or statement is not submitted or was submitted but is
also rejected, the Commission may also terminate the Agreement or the participation of the beneficiary
(see Article 34.3.1(i)).
ARTICLE 32 — SUSPENSION OF PAYMENTS
32.1 Conditions
The Commission may — at any moment — suspend payments, in whole or in part for one or more
beneficiaries, if:
(a) a beneficiary (or a natural person who has the power to represent or take decision on its behalf)
has committed or is suspected of having committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during the award procedure
(including improper implementation of the action, submission of false information,
failure to provide required information, breach of ethical principles), or
(b) a beneficiary (or a natural person who has the power to represent or take decision on its behalf)
has committed — in other EU or Euratom grants awarded to it under similar conditions —
systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a
material impact on this grant (extension of findings from other grants to this grant; see
Article 17.5.2).
If payments are suspended for one or more beneficiaries, the Commission will make partial payment(s)
for the part(s) not suspended. If suspension concerns the payment of the balance, the payment (or
recovery) of the amount(s) concerned after suspension is lifted will be considered to be the payment
that closes the action.
32.2 Procedure
Before suspending payments, the Commission will formally notify the coordinator or beneficiary
concerned:
- informing it of its intention to suspend payments and the reasons why and
- inviting it to submit observations within 30 days of receiving notification.
42
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
If the Commission does not receive observations or decides to pursue the procedure despite the
observations it has received, it will formally notify confirmation of the suspension. Otherwise, it will
formally notify that the suspension procedure is not continued.
The suspension will take effect the day the confirmation notification is sent by the Commission.
If the conditions for resuming payments are met, the suspension will be lifted. The Commission will
formally notify the coordinator or beneficiary concerned.
The beneficiaries may suspend implementation of the action (see Article 33.1) or terminate the
Agreement or the participation of the beneficiary concerned (see Article 34.1 and 34.2).
ARTICLE 33 — SUSPENSION OF THE ACTION IMPLEMENTATION
33.1 Suspension of the action implementation, by the beneficiaries
33.1.1 Conditions
The beneficiaries may suspend implementation of the action or any part of it, if exceptional
circumstances — in particular force majeure (see Article 35) — make implementation impossible or
excessively difficult.
33.1.2 Procedure
The coordinator must immediately formally notify to the Commission the suspension (see Article 36),
stating:
- the reasons why and
- the expected date of resumption.
The suspension will take effect the day this notification is received by the Commission.
Once circumstances allow for implementation to resume, the coordinator must immediately formally
notify the Commission and request an amendment of the Agreement to set the date on which the
action will be resumed, extend the duration of the action and make other changes necessary to adapt
the action to the new situation (see Article 39) — unless the Agreement or the participation of a
beneficiary has been terminated (see Article 34).
The suspension will be lifted with effect from the resumption date set out in the amendment. This
date may be before the date on which the amendment enters into force.
Costs incurred during suspension of the action implementation are not eligible (see Article 6).
33.2 Suspension of the action implementation, by the Commission
33.2.1 Conditions
The Commission may suspend implementation of the action or any part of it, if:
43
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
(a) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed or is suspected of having committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under this Agreement or during the award procedure
(including improper implementation of the action, submission of false declaration,
failure to provide required information, breach of ethical principles) or
(b) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed — in other EU or Euratom grants awarded to it under similar conditions —
systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a
material impact on this grant (extension of findings from other grants to this grant; see
Article 17.5.2).
33.2.2 Procedure
Before suspending implementation of the action, the Commission will formally notify the coordinator
or beneficiary concerned:
- informing it of its intention to suspend the implementation and the reasons why and
- inviting it to submit observations within 30 days of receiving notification.
If the Commission does not receive observations or decides to pursue the procedure despite the
observations it has received, it will formally notify confirmation of the suspension. Otherwise, it will
formally notify that the procedure is not continued.
The suspension will take effect five days after confirmation notification is received (or on a later date
specified in the notification).
It will be lifted if the conditions for resuming implementation of the action are met.
The coordinator or beneficiary concerned will be formally notified of the lifting and the Agreement
will be amended to set the date on which the action will be resumed, extend the duration of the action
and make other changes necessary to adapt the action to the new situation (see Article 39) — unless
the Agreement has already been terminated (see Article 34).
The suspension will be lifted with effect from the resumption date set out in the amendment. This date
may be before the date on which the amendment enters into force.
Costs incurred during suspension are not eligible (see Article 6).
The beneficiaries may not claim damages due to suspension by the Commission (see Article 30).
Suspension of the action implementation does not affect the Commission's right to terminate the
Agreement or participation of a beneficiary (see Article 34), reduce the grant or recover amounts
unduly paid (see Articles 27 and 28).
ARTICLE 34 — TERMINATION OF THE AGREEMENT OR OF THE PARTICIPATION
OF ONE OR MORE BENEFICIARIES
44
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
34.1 Termination of the Agreement by the beneficiaries
34.1.1 Conditions and procedure
The beneficiaries may terminate the Agreement.
The coordinator must formally notify termination to the Commission (see Article 36), stating:
- the reasons why and
- the date the termination will take effect. This date must be after the notification.
If no reasons are given or if the Commission considers the reasons do not justify termination, the
Agreement will be considered to have been ‘terminated improperly’.
The termination will take effect on the day specified in the notification.
34.1.2 Effects
The coordinator must — within 60 days from when termination takes effect — submit the final report
(see Article 15.4).
If the Commission does not receive the report(s) within the deadline (see above), no costs will be
taken into account.
The Commission will calculate the final grant amount (see Article 5.3) and the balance (see
Article 16.4) on the basis of the report(s) submitted. Only costs incurred until termination are eligible
(see Article 6). Costs relating to contracts due for execution only after termination are not eligible.
Improper termination may lead to a reduction of the grant (see Article 27).
After termination, the beneficiaries’ obligations (in particular, Articles 15, 17, 18, 19, 21, 22, 24, 26,
27 and 28) continue to apply.
34.2 Termination of the participation of one or more beneficiaries, by the beneficiaries
34.2.1 Conditions and procedure
The participation of one or more beneficiaries may be terminated by the coordinator, on request of
the beneficiary concerned or on behalf of the other beneficiaries.
The coordinator must formally notify termination to the Commission (see Article 36) and inform the
beneficiary concerned.
If the coordinator’s participation is terminated without its agreement, the formal notification must be
done by another beneficiary (acting on behalf of the other beneficiaries).
The notification must include:
- the reasons why;
45
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
- the opinion of the beneficiary concerned (or proof that this opinion has been requested in
writing);
- the date the termination takes effect. This date must be after the notification, and
- a request for amendment (see Article 39), with a proposal for reallocation of the tasks and the
estimated budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the
addition of one or more new beneficiaries (see Article 40). If termination takes effect after the
period set out in Article 3, no request for amendment must be included, unless the beneficiary
concerned is the coordinator. In this case, the request for amendment must propose a new
coordinator.
If this information is not given or if the Commission considers that the reasons do not justify
termination, the participation will be considered to have been terminated improperly.
The termination will take effect on the day specified in the notification.
34.2.2 Effects
The beneficiary concerned must submit to the coordinator:
(i) a technical report and
(ii) a financial statement covering the period to the date when termination takes effect.
This information must be included by the coordinator in the final report (see Article 15.4).
If the request for amendment is rejected by the Commission (because it calls into question the decision
awarding the grant or breaches the principle of equal treatment of applicants), the Agreement may be
terminated according to Article 34.3.1(c).
If the request for amendment is accepted by the Commission, the Agreement is amended to introduce
the necessary changes (see Article 39).
Improper termination may lead to a reduction of the grant (see Article 27) or termination of the
Agreement (see Article 34).
After termination, the concerned beneficiary’s obligations (in particular Articles 15, 17, 18, 19, 21,
22, 24, 26, 27 and 28) continue to apply.
34.3 Termination of the Agreement or of the participation of one or more beneficiaries, by the
Commission
34.3.1 Conditions
The Commission may terminate the Agreement or the participation of one or more beneficiaries, if:
(a) one or more beneficiaries do not accede to the Agreement (see Article 40);
(b) a change to their legal, financial, technical, organisational or ownership situation is likely to
46
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
substantially affect or delay the implementation of the action or calls into question the decision
to award the grant;
(c) following termination of participation for one or more beneficiaries (see above), the necessary
changes to the Agreement would call into question the decision awarding the grant or breach
the principle of equal treatment of applicants (see Article 39);
(d) implementation of the action is prevented by force majeure (see Article 35) or suspended by
the coordinator (see Article 33.1) and either:
(i) resumption is impossible, or
(ii) the necessary changes to the Agreement would call into question the decision awarding
the grant or breach the principle of equal treatment of applicants;
(e) a beneficiary is declared bankrupt, being wound up, having its affairs administered by the
courts, has entered into an arrangement with creditors, has suspended business activities, or is
subject to any other similar proceedings or procedures under national law;
(f) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has been found guilty of professional misconduct, proven by any means;
(g) a beneficiary does not comply with the applicable national law on taxes and social security;
(h) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed fraud, corruption, or is involved in a criminal organisation, money laundering
or any other illegal activity;
(i) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under the Agreement or during the award procedure
(including improper implementation of the action, submission of false information, failure
to provide required information, breach of ethical principles);
(j) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed — in other EU or Euratom grants awarded to it under similar conditions —
systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a
material impact on this grant (extension of findings from other grants to this grant; see
Article 17.5.2);
(k) not applicable.
34.3.2 Procedure
Before terminating the Agreement or participation of one or more beneficiaries, the Commission will
formally notify the coordinator or beneficiary conerned:
- informing it of its intention to terminate and the reasons why and
47
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
- inviting it, within 30 days of receiving notification, to submit observations and — in case of
Point (i.ii) above — to inform the Commission of the measures to ensure compliance with the
obligations under the Agreement.
If the Commission does not receive observations or decides to pursue the procedure despite the
observations it has received, it will formally notify to the coordinator or beneficiary concerned
confirmation of the termination and the date it will take effect. Otherwise, it will formally notify that
the procedure is not continued.
The termination will take effect:
- for terminations under Points (b), (c), (e), (g), (i.ii) and (k) above: on the day specified in the
notification of confirmation (see above);
- for terminations under Points (a), (d), (f), (h), (i.i) and (j) above: on the day after the notification
of the confirmation is received.
34.3.3 Effects
(a) for termination of the Agreement:
The coordinator must — within 60 days from when termination takes effect — submit a final
report (see Article 15.4).
If the Agreement is terminated for breach of the obligation to submit report(s) (see Articles 15.8
and 34.3.1(i)), the coordinator may not submit any report(s) after termination.
If the Commission does not receive the report(s) within the deadline (see above), no costs will
be taken into account.
The Commission will calculate the final grant amount (see Article 5.3) and the balance (see
Article 16.4) on the basis of the report(s) submitted. Only costs incurred until termination
takes effect are eligible (see Article 6). Costs relating to contracts due for execution only after
termination are not eligible.
This does not affect the Commission’s right to reduce the grant (see Article 27) or to impose
administrative sanctions (Article 29).
The beneficiaries may not claim damages due to termination by the Commission (see
Article 30).
After termination, the beneficiaries’ obligations (in particular Articles 15, 17, 18, 19, 21, 22,
24, 26, 27 and 28) continue to apply.
(b) for termination of the participation of one or more beneficiaries:
The coordinator must — within 60 days from when termination takes effect — submit a request
for amendment (see Article 39), with a proposal for reallocation of the tasks and estimated
budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the addition of
one or more new beneficiaries (see Article 40). If termination is notified after the period set out
48
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
in Article 3, no request for amendment must be submitted unless the beneficiary concerned is
the coordinator. In this case the request for amendment must propose a new coordinator.
The beneficiary concerned must submit to the coordinator:
(i) a technical report and
(ii) a financial statement covering the period to the date when termination takes effect.
This information must be included by the coordinator in the final report (see Article 15.4).
If the request for amendment is rejected by the Commission (because it calls into question the decision
awarding the grant or breaches the principle of equal treatment of applicants), the Agreement may be
terminated according to Article 34.3.1(c).
If the request for amendment is accepted by the Commission, the Agreement is amended to introduce
the necessary changes (see Article 39).
After termination, the concerned beneficiary’s obligations (in particular Articles 15, 17, 18, 19, 21,
22, 24, 26, 27 and 28) continue to apply.
SECTION 4 FORCE MAJEURE
ARTICLE 35 — FORCE MAJEURE
‘Force majeure’ means any situation or event that:
- prevents either party from fulfilling their obligations under the Agreement,
- was unforeseeable, exceptional situation and beyond the parties’ control,
- was not due to error or negligence on their part (or on the part of third parties involved in the
action), and
- proves to be inevitable in spite of exercising all due diligence.
The following cannot be invoked as force majeure:
- any default of a service, defect in equipment or material or delays in making them available,
unless they stem directly from a relevant case of force majeure,
- labour disputes or strikes, or
- financial difficulties.
Any situation constituting force majeure must be formally notified to the other party without delay,
stating the nature, likely duration and foreseeable effects.
The parties must immediately take all the necessary steps to limit any damage due to force majeure
and do their best to resume implementation of the action as soon as possible.
49
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
The party prevented by force majeure from fulfilling its obligations under the Agreement cannot be
considered in breach of them.
CHAPTER 7 FINAL PROVISIONS
ARTICLE 36 — COMMUNICATION BETWEEN THE PARTIES
36.1 Form and means of communication
Communication under the Agreement (information, requests, submissions, ‘formal notifications’, etc.)
must:
- be made in writing and
- bear the number of the Agreement.
Until the payment of the balance: all communication must be made through the electronic exchange
system and using the forms and templates provided there.
After the payment of the balance: formal notifications must be made by registered post with proof
of delivery (‘formal notification on paper’).
Communications in the electronic exchange system must be made by persons authorised according to
the Participant Portal terms & conditions. For naming the authorised persons, each beneficiary must
have designated — before the signature of this Agreement — a ‘legal entity appointed representative
(LEAR)’. The role and tasks of the LEAR are stipulated in his/her appointment letter (see Participant
Portal terms & conditions).
If the electronic exchange system is temporarily unavailable, instructions will be given on the
Commission websites.
36.2 Date of communication
Communications are considered to have been made when they are sent by the sending party (i.e. on
the date and time they are sent through the electronic exchange system).
Formal notifications through the electronic exchange system are considered to have been made when
they are received by the receiving party (i.e. on the date and time of acceptance by the receiving party,
as indicated by the time stamp). A formal notification that has not been accepted within 10 days after
sending is considered to have been accepted.
Formal notifications on paper sent by registered post with proof of delivery (only after the payment
of the balance) are considered to have been made on either:
- the delivery date registered by the postal service or
- the deadline for collection at the post office.
50
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
If the electronic exchange system is temporarily unavailable, the sending party cannot be considered
in breach of its obligation to send a communication within a specified deadline.
36.3 Addresses for communication
The electronic exchange system must be accessed via the following URL:
https://ec.europa.eu/research/participants/portal/desktop/en/projects/
The Commission will formally notify the coordinator and beneficiaries in advance any changes to
this URL.
Formal notifications on paper (only after the payment of the balance) addressed to the Commission
must be sent to the following address:
European Commission
Directorate General Justice and Consumers
Programme and financial management (MO59 04/021)
B-1049 Brussels
BELGIUM
Formal notifications on paper (only after the payment of the balance) addressed to the beneficiaries
must be sent to their legal address as specified in the Participant Portal Beneficiary Register.
ARTICLE 37 — INTERPRETATION OF THE AGREEMENT
37.1 Precedence of the Terms and Conditions over the Annexes
The provisions in the Terms and Conditions of the Agreement take precedence over its Annexes.
Annex 2 takes precedence over Annex 1.
37.2 Privileges and immunities
Not applicable
ARTICLE 38 — CALCULATION OF PERIODS, DATES AND DEADLINES
In accordance with Regulation No 1182/7112, periods expressed in days, months or years are calculated
from the moment the triggering event occurs.
The day during which that event occurs is not considered as falling within the period.
ARTICLE 39 — AMENDMENTS TO THE AGREEMENT
39.1 Conditions
12 Regulation (EEC, Euratom) No 1182/71 of the Council of 3 June 1971 determining the rules applicable to periods,
dates and time-limits (OJ L 124, 8/6/1971, p. 1).
51
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
The Agreement may be amended, unless the amendment entails changes to the Agreement which
would call into question the decision awarding the grant or breach the principle of equal treatment
of applicants.
Amendments may be requested by any of the parties.
39.2 Procedure
The party requesting an amendment must submit a request for amendment signed in the electronic
exchange system (see Article 36).
The coordinator submits and receives requests for amendment on behalf of the beneficiaries (see
Annex 3).
If a change of coordinator is requested without its agreement, the submission must be done by another
beneficiary (acting on behalf of the other beneficiaries).
The request for amendment must include:
- the reasons why;
- the appropriate supporting documents, and
- for a change of coordinator without its agreement: the opinion of the coordinator (or proof that
this opinion has been requested in writing).
The Commission may request additional information.
If the party receiving the request agrees, it must sign the amendment in the electronic exchange system
within 45 days of receiving notification (or any additional information the Commission has requested).
If it does not agree, it must formally notify its disagreement within the same deadline. The deadline
may be extended, if necessary for the assessment of the request. If no notification is received within
the deadline, the request is considered to have been rejected.
An amendment enters into force on the day of the signature of the receiving party.
An amendment takes effect on the date agreed by the parties or, in the absence of such an agreement,
on the date on which the amendment enters into force.
ARTICLE 40 — ACCESSION TO THE AGREEMENT
40.1 Accession of the beneficiaries mentioned in the Preamble
The other beneficiaries must accede to the Agreement by signing the Accession Form (see Annex 3) in
the electronic exchange system (see Article 36) within 30 days after its entry into force (see Article 42).
They will assume the rights and obligations under the Agreement with effect from the date of its entry
into force (see Article 42).
If a beneficiary does not accede to the Agreement within the above deadline, the coordinator must
— within 30 days — request an amendment to make any changes necessary to ensure proper
52
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
implementation of the action. This does not affect the Commission's right to terminate the Agreement
(see Article 34).
40.2 Addition of new beneficiaries
In justified cases, the beneficiaries may request the addition of a new beneficiary.
For this purpose, the coordinator must submit a request for amendment in accordance with Article 39.
It must include an Accession Form (see Annex 3) signed by the new beneficiary in the electronic
exchange system (see Article 36).
New beneficiaries must assume the rights and obligations under the Agreement with effect from the
date of their accession specified in the Accession Form (see Annex 3).
ARTICLE 41 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES
41.1 Applicable law
The Agreement is governed by the applicable EU law, supplemented if necessary by the law of
Belgium.
41.2 Dispute settlement
If a dispute concerning the interpretation, application or validity of the Agreement cannot be settled
amicably, the General Court — or, on appeal, the Court of Justice of the European Union — has sole
jurisdiction. Such actions must be brought under Article 272 of the Treaty on the Functioning of the
EU (TFEU).
If a dispute concerns administrative sanctions, offsetting or an enforceable decision under Article 299
TFEU (see Articles 28, 29 and 30), the beneficiaries must bring action before the General Court —
or, on appeal, the Court of Justice of the European Union — under Article 263 TFEU.
53
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
JUST/REC
Associated with document MGA — Multi:-v2.0
Ref. Ares(2017)6150899 14/12/2017
ARTICLE 42 — ENTRY INTO FORCE OF THE AGREEMENT
The Agreement will enter into force on the day of signature by the Commission or the coordinator,
depending on which is later.
SIGNATURES
For the coordinator For the Commission
[--TGSMark#signature-998429731_75_210--] [--TGSMark#signature-service_75_210--]
Marika PRISKE with ECAS id nprmaika signed in the Signed by Daniela BANKIER with ECAS id bankida as an
Participant Portal on 18/12/2017 at 11:24:22 (transaction id authorised representative on 19-12-2017 12:41:11
SigId-159732- (transaction id SigId-187321-
FkCllasjvVUF3zN4Z3tQUyVNUGgcQ5uWFJGA3ZUntvl1J JccqiqN6dGhouKXfazQTN2FSDrD9LATeLLByzXVaBjXYC
MyASXul8Xh4jbexUBzJpAzgnKitXU1fWkFmsLy4ZH0- OSMzu5DMl3qmzzcTTC6n36Qmey5kzq27MbJL0Jg2zT8-
PHslUMVSXYCIMrSeUedOzH- PHslUMVSXYCIMrSeUedOzH-
Lozup3ClSaUub418gznzPzvn8uTfswYGwHU0vHt4mblJ). XbCDQXYzSbFktsRZIirWDvF2UlzIEo1C3ssnZCTAVE0m)
Timestamp by third party at Tue Dec 19 12:41:15 CET 2017
Mon Dec 18 11:24:40 CET 2017
54
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
EUROPEAN COMMISSION
DIRECTORATE-GENERAL JUSTICE AND CONSUMERS
Programme and financial management
ANNEX 1 (part A)
REC Action Grant
NUMBER — 764255 — BADEV
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Table of Contents
1.1. The project summary................................................................................................................................. 3
1.2. The list of beneficiaries..............................................................................................................................5
1.3. Workplan Tables - Detailed implementation..............................................................................................6
1.3.1. WT1 List of work packages........................................................................................................... 6
1.3.2. WT2 List of deliverables................................................................................................................ 7
1.3.3. WT3 Work package descriptions................................................................................................. 10
Work package 1......................................................................................................................... 10
Work package 2......................................................................................................................... 14
Work package 3......................................................................................................................... 20
Work package 4......................................................................................................................... 23
1.3.4. WT4 List of milestones................................................................................................................ 25
1.3.5. WT5 Critical Implementation risks and mitigation actions........................................................... 26
1.3.6 WT6 Summary of project effort in person-months........................................................................27
1.3.7. WT7 Tentative schedule of project reviews.................................................................................28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
1.1. The project summary
Project Number 1 764255 Project Acronym 2 BADEV
One form per project
General information
Project title 3
Enhancing Barnahus model service delivery in Estonia, Latvia and Poland
Starting date 4 01/02/2018
Duration in months 5 24
Call (part) identifier 6 REC-CHILD-AG-2016-01
REC-RDAP-CHIL-AG-2016
Topic To support integrated and multidisciplinary child-centred approaches to child victims of
violence
Fixed EC Keywords
Children's house model, piloting enhanced service delivery, capacity rising of
Free keywords
professionals.
Abstract 7
Objectives
Overall: to contribute to the development of integrated child protection systems by providing multidisciplinary child-
centred approaches in the project partner countries.
Specific:
• To develop children’s house models
• To improve knowledge and exchange good practices for setting up children’s houses
• To enhance the capacity of stakeholders to handle cases involving child victims of violence
• To widen networking between stakeholders
• To ensure that only evidence-based service delivery methods are used
Activities
WP1: management and information dissemination activities
WP2: training plan development, trainings, guideline and information material development
WP3: piloting the service, assessing the service delivery
WP4: collecting and assessing therapies, developing, technological platform
Type and number of persons benefiting from the project
- children in children’s houses / their families: 70 in Estonia, 30 Latvia, Poland 98
- Stakeholders: 510 in Estonia, 190 in Latvia, 105 Poland
Expected results
- Improved knowledge and exchanged good practices in partner countries for setting up and developing the children’s
house model
- Enhanced capacity of children’s house workers and network members to handle cases involving child victims of
violence
- Widened cooperation and networking between stakeholders and increased awareness about the service delivery
model in the public
- Evidence-based service delivery models are used in children’s houses
Type and number of outputs to be produced
- Administrative reports
- 6 steering committee meeting minutes
- Final conference (100-150 participants)
- 12 press releases
- 24 articles and media coverage
- 6 local stakeholder meetings
- 1 joint syllabus
- 510 Estonian trainees
- 160 Latvian trainees
- 70 Polish trainees
- 45 trainees in joint trainings
Page 3 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
1.1. The project summary
- 11 different guidelines
- Children / families counselled: 70 Estonia, 30 Latvia, Poland 98
- 1 therapy platform
- 15 therapies collected to platform
Page 4 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
1.2. List of Beneficiaries
Project Number 1 764255 Project Acronym 2 BADEV
List of Beneficiaries
Project Project
No Name Short name Country entry exit
month8 month
1 SOTSIAALMINISTEERIUM MSAE Estonia 1 24
2 NODIBINAJUMS CENTRS DARDEDZE Centrs Dardedze Latvia 1 24
3 FUNDACJA DAJEMY DZIECIOM SILE FDDS Poland 1 24
Page 5 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
1.3. Workplan Tables - Detailed implementation
1.3.1. WT1 List of work packages
WP Person- Start End
WP Title Lead beneficiary10
Number9 months11 month12 month13
Management and Coordination of
WP1 1 - MSAE 42.40 1 24
the Project
Capacity rising, network
WP2 2 - Centrs Dardedze 36.00 1 22
development and sustainability
Enhancing the service delivery in
WP3 children's houses fitting the national 3 - FDDS 36.00 3 23
context of project partner countries
WP4 Therapy platform development 1 - MSAE 1.25 1 23
Total 115.65
Page 6 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
1.3.2. WT2 list of deliverables
Due
Deliverable WP Dissemination
Deliverable Title Lead beneficiary Type 15 Date (in
Number14 number9 level16
months)17
Confidential,
only for members
of the consortium
D1.1 Progress report to EC WP1 1 - MSAE Report 13
(including the
Commission
Services)
Confidential,
only for members
6 steering committee of the consortium
D1.2 WP1 1 - MSAE Other 24
meetings (including the
Commission
Services)
Final international
D1.3 WP1 1 - MSAE Other Public 23
conference
4 Press releases in
D1.4 WP1 1 - MSAE Report Public 24
Estonia
8 Articles and other
D1.5 media coverage - WP1 1 - MSAE Report Public 24
Estonia
2 Local stakeholder
D1.6 WP1 1 - MSAE Other Public 22
meetings - Estonia
4 Press releases in
D1.7 WP1 2 - Centrs Dardedze Report Public 24
Latvia
4 Press releases in
D1.8 WP1 3 - FDDS Report Public 24
Poland
8 Articles and other
D1.9 WP1 2 - Centrs Dardedze Report Public 24
media coverage - Latvia
8 Articles and other
D1.10 media coverage - WP1 3 - FDDS Report Public 24
Poland
2 Local stakeholder
D1.11 WP1 2 - Centrs Dardedze Other Public 22
meetings - Latvia
2 Local stakeholder
D1.12 WP1 3 - FDDS Other Public 22
meetings - Poland
Confidential,
only for members
Final assessment of all of the consortium
D1.13 WP1 1 - MSAE Report 24
project activities (including the
Commission
Services)
Joint syllabus in
D2.1 WP2 1 - MSAE Report Public 2
Estonia
D2.2 Estonian trainings WP2 1 - MSAE Other Public 20
D2.3 Latvian trainings WP2 2 - Centrs Dardedze Other Public 20
Page 7 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Due
Deliverable WP Dissemination
Deliverable Title Lead beneficiary Type15 Date (in
Number14 number9 level16
months)17
D2.4 Polish trainings WP2 3 - FDDS Other Public 20
D2.5 Joint trainings WP2 2 - Centrs Dardedze Other Public 22
Poland - Elaborating
protocols, guidelines,
standards for
D2.6 WP2 3 - FDDS Report Public 21
multisectoral
cooperation within
CAC
D2.7 Joint syllabus in Latvia WP2 2 - Centrs Dardedze Report Public 2
D2.8 Joint syllabus in Poland WP2 3 - FDDS Report Public 2
Poland - Elaborating
D2.9 guidelines on working WP2 3 - FDDS Report Public 21
post-traumatic children
Estonia - Elaborating
D2.10 guidelines to handle WP2 1 - MSAE Report Public 21
sexual abuse cases
Estonia - Elaborating
information material
about Childs´s House
D2.11 WP2 1 - MSAE Report Public 21
(model, network etc)
for specialist working
with children
Estonia - Elaborating
guidelines for
D2.12 interviewing children WP2 1 - MSAE Report Public 21
with special needs
(disabled and migrant)
Estonia - Elaborating
D2.13 guidelines on working WP2 1 - MSAE Report Public 21
post-traumatic children
Estonia - Elaborating
guidelines for
D2.14 WP2 1 - MSAE Report Public 21
interviewing children
using sign language
Latvia - Elaborating
protocols, guidelines,
standards for
D2.15 WP2 2 - Centrs Dardedze Report Public 21
multisectoral
cooperation within
Children`s House
Latvia - Elaborating
D2.16 guidelines on working WP2 2 - Centrs Dardedze Report Public 21
post-traumatic children
Latvia - Training
materials for joint
D2.17 WP2 2 - Centrs Dardedze Report Public 21
investigative teams
in future regional
Page 8 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Due
Deliverable WP Dissemination
Deliverable Title Lead beneficiary Type15 Date (in
Number14 number9 level16
months)17
Children`s House
locations (4 regions)
Confidential,
only for members
Mid-evaluation of of the consortium
D2.18 WP2 2 - Centrs Dardedze Report 14
trainings (including the
Commission
Services)
Confidential,
only for members
Final evaluation of of the consortium
D2.19 WP2 2 - Centrs Dardedze Report 22
trainings (including the
Commission
Services)
New services piloted in
D3.1 WP3 1 - MSAE Other Public 21
Estonia
New services piloted in
D3.2 WP3 2 - Centrs Dardedze Other Public 21
Latvia
New services piloted in
D3.3 WP3 3 - FDDS Other Public 21
Poland
Confidential,
only for members
Mid-evaluation of of the consortium
D3.4 WP3 3 - FDDS Report 7
services (including the
Commission
Services)
Confidential,
only for members
Final evaluation of of the consortium
D3.5 WP3 3 - FDDS Report 22
services (including the
Commission
Services)
Report on requirements
(conceptual and IT) for
D4.1 WP4 1 - MSAE Report Public 5
the therapy platform
tool
Websites,
Therapy platform
D4.2 WP4 1 - MSAE patents Public 6
online tool
filling, etc.
Guide for the therapy
D4.3 WP4 1 - MSAE Report Public 13
platform tool
D4.4 Toolkit WP4 1 - MSAE Report Public 23
Page 9 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
1.3.3. WT3 Work package descriptions
Work package number 9 WP1 Lead beneficiary 10 1 - MSAE
Work package title Management and Coordination of the Project
Start month 1 End month 24
Objectives
The objective of the WP is to ensure the smooth and effective management of the project, achieving all objectives and
results in time and with agreed-upon quality criteria.
Description of work and role of partners
WP1 - Management and Coordination of the Project [Months: 1-24]
MSAE, Centrs Dardedze, FDDS
1. Administrative and financial management of the project (All partners in their country. Overall responsibility: MSAE)
2. Information dissemination activities (All partners in their country. Overall responsibility: MSAE)
3. Local stakeholder meetings (All partners in their country. Overall responsibility: MSAE)
Participation per Partner
Partner number and short name WP1 effort
1 - MSAE 26.40
2 - Centrs Dardedze 8.00
3 - FDDS 8.00
Total 42.40
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
Confidential, only
for members of the
D1.1 Progress report to EC 1 - MSAE Report consortium (including 13
the Commission
Services)
Confidential, only
for members of the
6 steering committee
D1.2 1 - MSAE Other consortium (including 24
meetings
the Commission
Services)
Final international
D1.3 1 - MSAE Other Public 23
conference
4 Press releases in
D1.4 1 - MSAE Report Public 24
Estonia
Page 10 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
8 Articles and other
D1.5 1 - MSAE Report Public 24
media coverage -Estonia
2 Local stakeholder
D1.6 1 - MSAE Other Public 22
meetings - Estonia
D1.7 4 Press releases in Latvia 2 - Centrs Dardedze Report Public 24
D1.8 4 Press releases in Poland 3 - FDDS Report Public 24
8 Articles and other
D1.9 2 - Centrs Dardedze Report Public 24
media coverage - Latvia
8 Articles and other
D1.10 3 - FDDS Report Public 24
media coverage - Poland
2 Local stakeholder
D1.11 2 - Centrs Dardedze Other Public 22
meetings - Latvia
2 Local stakeholder
D1.12 3 - FDDS Other Public 22
meetings - Poland
Confidential, only
for members of the
Final assessment of all
D1.13 1 - MSAE Report consortium (including 24
project activities
the Commission
Services)
Description of deliverables
1. Steering committee meetings.
2. Final international conference 100-150 participants.
3. Press releases (electronic, printed, Estonian, Latvian, Polish) -4 per country, 12 in total.
4. Articles and other media coverage (electronic, printed, Estonian, Latvian, Polish - 8 per country, 24 in total.
5. Local stakeholder meetings - 2 per country, 6 in total.
6. Final assessment of all project activities.
D1.1 : Progress report to EC [13]
Progress report to EC after the mid-term period of Project (in EN).
D1.2 : 6 steering committee meetings [24]
Tangible results: -Electronic minutes in English reflecting the steering committee meetings (6 in total). -Signed lists
of participants; -Agenda.
D1.3 : Final international conference [23]
100-150 participants. At the end of the project together with the wrapping-up final meeting of the project, applicant
will organize an international conference. The representatives of Partner organizations will participate in the
conference and present their good practices. The main topic of the conference will be the different aspects of
children’s house model implementation. The international and local speakers will discuss inter-agency and
interdisciplinary cooperation, the child-friendly interviewing, different approaches of therapeutic support provided to
children victims of abuse and their families as well as the latest empirical and theoretical facts and data concerning
the problem of child abuse and neglect. Program of the conference will include plenary sessions, lectures and
workshops in smaller groups. Tangible results: Conference agenda, materials in Estonian, Latvian, Polish and
English, signed participant list, feedback questionnaire, electronic minutes in English reflecting the closing
conference. Target group: Project partner organizations, stakeholders, including authorities, professionals,
Page 11 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
representatives of health sector, education, social services, judges, prosecutors, teachers, psychologists, pedagogues
etc.
D1.4 : 4 Press releases in Estonia [24]
4 Press releases (electronic, printed, Estonian) Target group: Wider public.
D1.5 : 8 Articles and other media coverage -Estonia [24]
8 Articles and other media coverage (electronic, printed, Estonian) Target group: Wider public.
D1.6 : 2 Local stakeholder meetings - Estonia [22]
2 Local stakeholder meetings. The stakeholders (social services, local authorities, prosecution, forensic interviewers
and others depending on country specifics, approx. 30 persons per country) meet to analyze and support the
implementation of the project (including the elaboration of guidelines). Invitation, agenda, signed presence list,
minutes of the meeting in English. Target group: Project partner organizations, stakeholders.
D1.7 : 4 Press releases in Latvia [24]
4 Press releases (electronic, printed, Latvia) Target group: Wider public.
D1.8 : 4 Press releases in Poland [24]
4 Press releases (electronic, printed, Polish) Target group: Wider public.
D1.9 : 8 Articles and other media coverage - Latvia [24]
8 Articles and other media coverage (electronic, printed, Latvian) Target group: Wider public.
D1.10 : 8 Articles and other media coverage - Poland [24]
8 Articles and other media coverage (electronic, printed, Polish) Target group: Wider public.
D1.11 : 2 Local stakeholder meetings - Latvia [22]
2 Local stakeholder meetings The stakeholders (social services, local authorities, prosecution, forensic interviewers
and others depending on country specifics, approx. 30 persons per country) meet to analyze and support the
implementation of the project (including the elaboration of guidelines). Invitation, agenda, signed presence list,
minutes of the meeting in English. Target group: Project partner organizations, stakeholders.
D1.12 : 2 Local stakeholder meetings - Poland [22]
2 Local stakeholder meetings The stakeholders (social services, local authorities, prosecution, forensic interviewers
and others depending on country specifics, approx. 30 persons per country) meet to analyze and support the
implementation of the project (including the elaboration of guidelines). Invitation, agenda, signed presence list,
minutes of the meeting in English. Target group: Project partner organizations, stakeholders.
D1.13 : Final assessment of all project activities [24]
Final assessment of all project activities, incl feedback from all project members - electronic, in EN.
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
First and second stakeholder
MS1 Stakeholder meetings 1 and 2 1 - MSAE 9
meeting held.
All stakeholder meetings All stakeholder meetings
MS6 1 - MSAE 22
held. held.
Final assessment of all project
Final assessment of all project
MS9 1 - MSAE 24 activities, incl feedback from
activities
all project members.
Regular partners
Administrative and financial
MS10 1 - MSAE 24 administrative and financial
reports
reports. Electronic reports
Page 12 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
in English covering all
relevant aspects of the project
activities during the reporting
period.
Page 13 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Work package number 9 WP2 Lead beneficiary 10 2 - Centrs Dardedze
Work package title Capacity rising, network development and sustainability
Start month 1 End month 22
Objectives
The objective of the workpackage is to ensure that the children’s house workers and network members have the full
capacity to provide various therapies and interventions effectively and efficiently and to guarantee that all relevant
stakeholders and wider public are aware of the role and possibilities children’s house has in the society.
Description of work and role of partners
WP2 - Capacity rising, network development and sustainability [Months: 1-22]
Centrs Dardedze, MSAE, FDDS
1 Joint training plan / syllabus development.(All partners).
2. Carrying out trainings in project partner countries. (MSAE)
The provisional themes for Estonia are: (Ministry of Social Affairs together with Estonian Social Insurance Board)
• Awareness raising of the children’s house conception
• Working with post-traumatic children
• Interviewing children with special needs (including immigrant children)
• How to handle cases involving mistreated children using sign language
• How to interview child victims of violence meeting the criteria foreseen in children’s house
The provisional themes for Latvia are: (Dardedze)
• Multisectoral cooperation
• Training for joint investigative teams in future regional Children`s House locations
• Training on narrative therapy
The provisional themes for Poland are: (PECF)
• Training on narrative therapy.
• Training on sand therapy
• Training for joint investigative teams in pilot CAC locations
The provisional themes for joint trainings are (All partners)
• Post trauma therapy (in two parts)
• Multisectoral cooperation
Guidelines and information material development: (All partners)
• Elaborating protocols, guidelines, standards for multisectoral cooperation within CAC in Poland
• Elaborating guidelines on working post-traumatic children in Poland
• Elaborating guidelines to handle sexual abuse cases in Estonia
• Elaborating information material about Child's House (model, network etc.) for specialist working with children in
Estonia
• Elaborating guidelines for interviewing children with special needs (disabled and migrant) in Estonia
• Elaborating guidelines on working post-traumatic children in Estonia
• Elaborating guidelines for interviewing children using sign language in Estonia
• Elaborating protocols, guidelines, standards for multisectoral cooperation within Children's House in Latvia.
• Elaborating guidelines on working post-traumatic children in Latvia
• Training materials for joint investigative teams in future regional Children`s House locations (4 regions) in Latvia.
Participation per Partner
Partner number and short name WP2 effort
1 - MSAE 12.00
Page 14 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Partner number and short name WP2 effort
2 - Centrs Dardedze 12.00
3 - FDDS 12.00
Total 36.00
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in
Number14
months)17
D2.1 Joint syllabus in Estonia 1 - MSAE Report Public 2
D2.2 Estonian trainings 1 - MSAE Other Public 20
D2.3 Latvian trainings 2 - Centrs Dardedze Other Public 20
D2.4 Polish trainings 3 - FDDS Other Public 20
D2.5 Joint trainings 2 - Centrs Dardedze Other Public 22
Poland - Elaborating
protocols, guidelines,
D2.6 standards for 3 - FDDS Report Public 21
multisectoral cooperation
within CAC
D2.7 Joint syllabus in Latvia 2 - Centrs Dardedze Report Public 2
D2.8 Joint syllabus in Poland 3 - FDDS Report Public 2
Poland - Elaborating
D2.9 guidelines on working 3 - FDDS Report Public 21
post-traumatic children
Estonia - Elaborating
D2.10 guidelines to handle 1 - MSAE Report Public 21
sexual abuse cases
Estonia - Elaborating
information material
about Childs´s House
D2.11 1 - MSAE Report Public 21
(model, network etc) for
specialist working with
children
Estonia - Elaborating
guidelines for
D2.12 interviewing children 1 - MSAE Report Public 21
with special needs
(disabled and migrant)
Estonia - Elaborating
D2.13 guidelines on working 1 - MSAE Report Public 21
post-traumatic children
Estonia - Elaborating
guidelines for
D2.14 1 - MSAE Report Public 21
interviewing children
using sign language
Page 15 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
Latvia - Elaborating
protocols, guidelines,
D2.15 standards for 2 - Centrs Dardedze Report Public 21
multisectoral cooperation
within Children`s House
Latvia - Elaborating
D2.16 guidelines on working 2 - Centrs Dardedze Report Public 21
post-traumatic children
Latvia - Training
materials for joint
investigative teams
D2.17 2 - Centrs Dardedze Report Public 21
in future regional
Children`s House
locations (4 regions)
Confidential, only
for members of the
Mid-evaluation of
D2.18 2 - Centrs Dardedze Report consortium (including 14
trainings
the Commission
Services)
Confidential, only
for members of the
Final evaluation of
D2.19 2 - Centrs Dardedze Report consortium (including 22
trainings
the Commission
Services)
Description of deliverables
1. Joint syllabus in Estonia (MSAE). Target group: Project partner organizations and stakeholders.
2. Joint syllabus in Poland (PECF). Target group: Project partner organizations and stakeholders.
3. Joint syllabus in Latvia (Dardedze). Target group: Project partner organizations and stakeholders.
4. Estonian trainings. Target group: Project partner organizations and stakeholders, children’s house workers, 116 111
counsellors.
5. Latvian trainings. Target group: Project partner organizations and stakeholders, children’s house staff; members
of joint investigative teams– (e.g. forensic interviewers, judges, prosecutors, psychologists, social workers, medicals
experts).
6. Polish trainings. Target group: Project partner organizations and stakeholders, children’s house staff.
7. Joint trainings. Target group: Project partner organizations and stakeholders, children’s house staff.
8. Guidelines: Target group: Project partner organizations and stakeholders, children’s house staff.
Guidelines and information material development:
• Elaborating protocols, guidelines, standards for multisectoral cooperation within CAC in Poland
• Elaborating guidelines on working post-traumatic children in Poland
• Elaborating guidelines to handle sexual abuse cases in Estonia
• Elaborating information material about Childs´s House (model, network etc.) for specialist working with children in
Estonia
• Elaborating guidelines for interviewing children with special needs (disabled and migrant) in Estonia
• Elaborating guidelines on working post-traumatic children in Estonia
• Elaborating guidelines for interviewing children using sign language in Estonia
Page 16 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
• Elaborating guidelines on working post-traumatic children in Latvia
• Elaborating protocols, guidelines, standards for multisectoral cooperation within Children's House in Latvia.
• Implement and evaluate “Recommendations for Barnahus model in Latvia” in Riga, in Centre Dardedze (30 cases).
• Revising existing guidelines and practices in 4 regional crisis centres in the scope of “Recommendations for
Barnahus model in Latvia”.
• Training materials for joint investigative teams in future regional Children`s House locations (4 regions) in Latvia.
9. Mid and final evaluation of trainings.
D2.1 : Joint syllabus in Estonia [2]
Electronic syllabus in English for each partner country focusing at specific counselling skills, interviewing skills,
working with children with special needs, child psychology, co-operation and network skills, capacity to handle
international cases, ICT skills etc. Target group: Project partner organisations and stakeholders.
D2.2 : Estonian trainings [20]
Estonian trainings Awareness rising of the children’s house conception. 250 Estonian specialists working with
children (including substitute home workers, child protectors, teachers from schools and kindergartens etc) will take
part in the 4-hour event. Two trainings with 125 participants respectively will be organised. Deliverables: invitation,
agenda, signed presence list, materials, activity report in EN, feedback questionnaire in Estonian. Working with post-
traumatic children. 200 specialists working at shelters, substitute homes and substitute families etc will take part
in the 1-day training. Four trainings with 50 participants in each group will be organised. Deliverables: invitation,
agenda, signed presence list, materials, activity report in EN, feedback questionnaire in Estonian. Interviewing
children with special needs (including immigrant children and disabled children). 40 specialists conducting such
interviews (children’s house workers, police officers etc) will take part in the 2-day training. Two training sessions
with 20 participants in each group will be organised. Deliverables: invitation, agenda, signed presence list, materials,
activity report in EN, feedback questionnaire in Estonian. How to handle cases involving mistreated children using
sign language. 10 sign language interpreters will participate in the 1 day training. Deliverables: invitation, agenda,
signed presence list, materials, activity report in EN, feedback questionnaire in Estonian. How to interview child
victims of violence meeting the criteria foreseen in children’s house. 10 116 111 helpline counsellors will participate
in the 2 day training. Deliverables: invitation, agenda, signed presence list, materials, activity report in EN, feedback
questionnaire in Estonian. Target group: Project partner organisations and stakeholders, children’s house workers, 116
111 counsellors.
D2.3 : Latvian trainings [20]
Latvian trainings Multisectoral cooperation: Five 3 days trainings for representatives of different agencies and
institutions (4 people teams – social worker, prosecutor, police officer, health sector) on cooperation in the cases
of sexual abuse against children + introducing Children`s house model will be conducted. The objective of the
trainings will be to learn how to provide high-quality child-friendly services to children- victims and how to support
their families, to identify the role, specifics and responsibilities of each cooperating agencies and institutions
and to introduce an efficient, practical model of inter-agency and interdisciplinary cooperation. The trainings
will be organized for 5 different regions (25 municipalities), reaching 4x5=20 people x 5 locations =100 people.
Deliverables: invitation, agenda, signed presence list, materials, activity report in EN, feedback questionnaire
in Latvian. Training for joint investigative teams in future regional Children`s House locations – crisis centres
in 4 regions. For the effective future implementation of the model in Latvia it is necessary to train the teams in
four regions of Latvia. 4 teams, 15 participants each, will be trained on the protocols, guidelines, standards for
multidisciplinary cooperation and basic principles on forensic interviewing. (2 trainers, 4x2 day trainings will
be conducted in 4 locations, 15 participants each, 60 people trained in total). Deliverables: invitation, agenda,
signed presence list, materials, activity report in EN, feedback questionnaire in Latvian. Narrative therapy: Latvian
experts (4 people)will participate in the training organized by the Polish partner in Poland. Deliverables: invitation,
agenda, signed presence list, materials, activity report in EN, feedback questionnaire. Target group: Project
partner organisations and stakeholders, children’s house staff; members of joint investigative teams– (e.g. forensic
interviewers, judges, prosecutors, psychologists, social workers, medicals experts).
D2.4 : Polish trainings [20]
Polish trainings Narrative therapy is a research based on effective therapeutic approach used for group and individual
therapy for older children victims of abuse and adults (their families). 15 therapists working in local Children Advice
Centers (CAC) from Poland will participate in the 5 –day training. Deliverables: invitation, agenda, signed presence
list, materials, activity report in EN, feedback questionnaire in Polish. Sand therapy is a research based, effective
therapeutic approach used for assessment and individual therapy for small children- victims of abuse. 15 therapists
working in local CACs from Poland will participate in the 5 – day training. Deliverables: invitation, agenda, signed
Page 17 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
presence list, materials, activity report in EN, feedback questionnaire in Polish. Training for joint investigative
teams in pilot CAC locations. Trainings for the members of joint investigative teams on child –friendly interviewing
protocol and techniques will be organized. 4 x 2 –day trainings will be conducted in Poland (1 in Warsaw and 3 in
other CAC’s locations) for approximately 25 persons. Deliverables: invitation, agenda, signed presence list, materials,
activity report in EN, feedback questionnaire in Polish. Target group: Project partner organisations and stakeholders,
children’s house staff.
D2.5 : Joint trainings [22]
Joint trainings Post-trauma therapy: Trainings will be organised for up to 10 specialists working with child victims
from each project partner country (30 persons in total). Two-day training will be organised in Estonia at the beginning
of the project and one-day training at the end. Deliverables: invitation, agenda, signed presence list, materials, activity
report in EN, feedback questionnaire in English. Multisectoral cooperation: 5 persons from each partner country will
participate in the training and study visit (two days). It will be the opportunity to share good practices and challenges
regarding the developing and implementing of CAC’s model of operation in project’s partner countries and to visit the
Estonian partner’s facilities. Foreign expert from one of Scandinavian’s Barnahuses will be invited to present good
practice of multisectoral cooperation. Deliverables: invitation, agenda, signed presence list, materials, activity report
in EN, feedback questionnaire in English. Target group: Project partner organisations and stakeholders, children’s
house staff.
D2.6 : Poland - Elaborating protocols, guidelines, standards for multisectoral cooperation within CAC [21]
The aim is the set standards and guidelines in all the areas of CAC’s operation such us forensic interviews, victim
support, medical examinations, therapeutic services as well as facilitate the work of multidisciplinary team: forensic
interviewers, lawyers, medical doctors, therapists and social workers by establishing clear, step by step protocols of
cooperation. Guidelines will be in Polish, in electronic format, made available at partner and stakeholder websites.
Target group: Project partner organizations and stakeholders, children’s house staff, wider public.
D2.7 : Joint syllabus in Latvia [2]
Electronic syllabus in English for each partner country focusing at specific counselling skills, interviewing skills,
working with children with special needs, child psychology, co-operation and network skills, capacity to handle
international cases, ICT skills etc Target group: Project partner organisations and stakeholders
D2.8 : Joint syllabus in Poland [2]
Electronic syllabus in English for each partner country focusing at specific counseling skills, interviewing skills,
working with children with special needs, child psychology, co-operation and network skills, capacity to handle
international cases, ICT skills etc Target group: Project partner organisations and stakeholders.
D2.9 : Poland - Elaborating guidelines on working post-traumatic children [21]
The aim of the guidelines is to explain the different aspects of working with post-traumatic children, including how
to interview post-traumatic children. The guidelines will be in Polish, 1000 copies + online. Target group: Project
partner organizations and stakeholders, children’s house staff, wider public.
D2.10 : Estonia - Elaborating guidelines to handle sexual abuse cases [21]
The aim of the guideline is to raise the awareness on identifying sexual abuse cases, how to handle such cases and
how to recognize such children. The guidelines will be made for specialists working with children. Guidelines will
be provided in Estonian and Russian language, 1000 copies + online Target group: Project partner organizations and
stakeholders, children’s house staff, wider public.
D2.11 : Estonia - Elaborating information material about Childs´s House (model, network etc) for specialist working
with children [21]
The aim of the guidelines is to inform specialists working with children about the network handling child victim
cases, what is the role of each specialist in that network and to explain how the Children´s House model functions
within the network. Guidelines will be provided in Estonian and Russian, 1000 copies + online Target group: Project
partner organizations and stakeholders, children’s house staff, wider public.
D2.12 : Estonia - Elaborating guidelines for interviewing children with special needs (disabled and migrant) [21]
The aim of the guidelines is to explain the different aspects of working with children who have special needs,
including conducting interviews. The guidelines will be in Estonian and Russian, 1000 copies + online. Target group:
Project partner organizations and stakeholders, children’s house staff, wider public.
D2.13 : Estonia - Elaborating guidelines on working post-traumatic children [21]
Page 18 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
The aim of the guidelines is to explain the different aspects of working with post-traumatic children, including how
to interview post-traumatic children. The guidelines will be in Estonian and Russian, 1000 copies + online. Target
group: Project partner organizations and stakeholders, children’s house staff, wider public.
D2.14 : Estonia - Elaborating guidelines for interviewing children using sign language [21]
The aim of the guidelines is to explain the different aspects of working with children who need sign language in order
to communicate, including how to conducting interviews. The guidelines will be in Estonian and Russian, 100 copies
+ online Target group: Project partner organizations and stakeholders, children’s house staff, wider public.
D2.15 : Latvia - Elaborating protocols, guidelines, standards for multisectoral cooperation within Children`s House
[21]
The aim is to set standards and guidelines in all the areas of Children`s House operation such us forensic interviews,
victim support, medical examinations, therapeutic services as well as facilitate the work of multidisciplinary team:
forensic interviewers, lawyers, medical doctors, therapists and social workers by establishing clear, step by step
protocols of cooperation. The documents will be based on the standards and good practices developed by PROMISE
network and of the National Alliance of Child Advocacy Centres and input from stakeholders. The guidelines will
be in Latvian and Russian, 1000 copies + online. • Implement and evaluate “Recommendations for Barnahus model
in Latvia” in Riga, in Centre Dardedze (30 cases). • Revising existing guidelines and practices in 4 regional crisis
centres in the scope of “Recommendations for Barnahus model in Latvia”. Target group: Project partner organizations
and stakeholders, children’s house staff, wider public.
D2.16 : Latvia - Elaborating guidelines on working post-traumatic children [21]
The aim of the guidelines is to explain the different aspects of working with post-traumatic children, including how
to interview post-traumatic children. The guidelines will be in Latvian, 1000 copies + online. Target group: Project
partner organizations and stakeholders, children’s house staff, wider public.
D2.17 : Latvia - Training materials for joint investigative teams in future regional Children`s House locations (4
regions) [21]
Based on the protocols, guidelines, standards for multisectoral cooperation training resources containing information
about child development stages, guidelines, techniques and protocols for child-friendly interviewing and multisectoral
cooperation on reacting and investigating child sexual abuse cases will be developed. The guidelines will be in
Latvian and Russian, 2000 copies+ online. Target group: Project partner organizations and stakeholders, children’s
house staff, wider public.
D2.18 : Mid-evaluation of trainings [14]
Mid-evaluation of trainings held in 3 countries - electronic, in EN.
D2.19 : Final evaluation of trainings [22]
Final evaluation of joint trainings in 3 countries - electronic, in EN.
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
Mid-evaluation of trainings in
MS4 Mid evaluation of trainings 2 - Centrs Dardedze 14
3 countries.
Final evaluation of joint Final evaluation of joint
MS5 2 - Centrs Dardedze 22
trainings. trainings in 3 countries.
Final assessment of all project
Final assessment of all project
MS9 1 - MSAE 24 activities, incl feedback from
activities
all project members.
Page 19 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Work package number 9 WP3 Lead beneficiary 10 3 - FDDS
Enhancing the service delivery in children's houses fitting the national context of project
Work package title
partner countries
Start month 3 End month 23
Objectives
The objective of the workpackage is to enhance the service delivery model in Estonia and Poland and create the
preconditions and readiness in Latvia to pilot the model post-project.
Description of work and role of partners
WP3 - Enhancing the service delivery in children's houses fitting the national context of project partner
countries [Months: 3-23]
FDDS, MSAE, Centrs Dardedze
Estonia: (MSAE)
• providing family therapy, group counselling, individual face-to-face counselling in the children’s house
• integrating phone / e-counselling (116 111 service) into the system
• assessing the quality of the services provided (intermediate evaluation, final evaluation).
• Supervision of the staff - 1 day supervision for the Children’s House workers will take place.
Poland: (PECF)
• Providing narrative therapy (individual and group therapy)
• Providing sand therapy
Latvia: (Dardedze)
• Piloting the elaborated guidelines, protocols, manual and narrative therapy in Riga region (30 cases).
Participation per Partner
Partner number and short name WP3 effort
1 - MSAE 12.00
2 - Centrs Dardedze 12.00
3 - FDDS 12.00
Total 36.00
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
New services piloted in
D3.1 1 - MSAE Other Public 21
Estonia
New services piloted in
D3.2 2 - Centrs Dardedze Other Public 21
Latvia
New services piloted in
D3.3 3 - FDDS Other Public 21
Poland
Mid-evaluation of Confidential, only
D3.4 3 - FDDS Report 7
services for members of the
Page 20 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
consortium (including
the Commission
Services)
Confidential, only
for members of the
Final evaluation of
D3.5 3 - FDDS Report consortium (including 22
services
the Commission
Services)
Description of deliverables
1. New services piloted in Estonia. Target group. children, their families.
2. New services piloted in Latvia. Target group: children, their families.
3. New services piloted in Poland. Target group: children, their families.
4. Intermediate and final evaluation of services in 3 countries.
D3.1 : New services piloted in Estonia [21]
Piloting of the 4 services elaborated: family therapy, group counselling, individual face-to-face counselling in the
children’s house, integrating phone / e- counselling (116 111 service) into the system: 1. 30 children 2. 40 adults (two
groups, each containing 20 persons) Supervision of the staff - 1 day supervision for the Children’s House workers will
take place. Assessing the service provision on two adult groups (2x12) and one on children (1x15). Tangible results:
activity report in EN, signed presence list, feedback questionnaire in Estonian. Target group: children, their families
D3.2 : New services piloted in Latvia [21]
Piloting the elaborated guidelines, protocols, manual and and narrative therapy reaching for 30 cases of children/
families counselled in Riga region. Tangible results: activity report in EN, signed presence list, feedback
questionnaire in Latvian. Target group: children, their families.
D3.3 : New services piloted in Poland [21]
Providing narrative therapy (individual and group therapy) during 60-90 days in order to pilot the new method. (two
therapists x 15 cases each) + 2 therapy groups (30 hours each ( 36-38 clients). Providing sand therapy during 60-90
days in order to pilot the new method. (two therapists x 15 cases each). (Total = 98) Tangible results: activity report in
EN, signed presence list, feedback questionnaire in Polish. Target group: children, their families.
D3.4 : Mid-evaluation of services [7]
Mid-evaluation of the new services piloted in 3 countries - electronic, in EN.
D3.5 : Final evaluation of services [22]
Final Evaluation of new services piloted in 3 countries - electronic, in EN.
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
Mid evaluation of services
MS2 Mid evaluation of services 3 - FDDS 7
held in 3 countries.
Final evaluation of services
MS7 Final evaluation of services. 3 - FDDS 22
held in 3 countries.
Page 21 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
Final assessment of all project
Final assessment of all project
MS9 1 - MSAE 24 activities, incl feedback from
activities
all project members.
Page 22 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Work package number 9 WP4 Lead beneficiary 10 1 - MSAE
Work package title Therapy platform development
Start month 1 End month 23
Objectives
The objective of the workpackage is to describe and analyze the current therapies and counselling methods used for
handling certain specific cases (“if the child has been involved in X, then the best method would be Y”) accordingly.
The online tool will be used by Children´s House team of specialists to empower specialists during the decision making
process of using certain therapies in some cases. This tool will be based on existing knowledge and resources of various
therapies, which will be analyzed from a comprehensive and child-centered approach. The tool can be used in any EU
country.
Description of work and role of partners
WP4 - Therapy platform development [Months: 1-23]
MSAE
1. Different available therapies have been collected and assessed, the best-possible solutions / combination of solutions
have been determined and made available at the therapy platform (15).
2. Definition of IT requirements for the development of the therapy platform tool. The IT requirements will be defined
to respond to the conceptual requirements defined by the partnership.
3.Technological development of the therapy platform tool. The development will be performed according to the
established requirements.
4. Provision of a guide on how to use the tool. In order to make sure that the tool is working correctly each partner
will carry out an experimentation use and by any other operator outside the project team that may have the interest in
using the tool.
5. After experimentation and evaluation has been finished some recommendations for the tool may be delivered. If there
are any improvements needed to be done, they will be incorporated in the tool.
Participation per Partner
Partner number and short name WP4 effort
1 - MSAE 1.25
Total 1.25
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in
Number14
months)17
Report on requirements
D4.1 (conceptual and IT) for 1 - MSAE Report Public 5
the therapy platform tool
Websites,
Therapy platform online
D4.2 1 - MSAE patents Public 6
tool
filling, etc.
Guide for the therapy
D4.3 1 - MSAE Report Public 13
platform tool
Page 23 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
D4.4 Toolkit 1 - MSAE Report Public 23
Description of deliverables
1. Report on requirements (conceptual and IT) for the therapy platform tool (both on paper and pdf-version). Minutes
from national and international round-tables (in 3 partner-country languages)
2. Technical solution for therapy platform online tool (web-pages in 3 languages with one host in each country)
presented online.
3. Guide to use the therapy platform tool presented online with an online-manual (in 3 partner-country languages and
in English).
4. Toolkit. List of mental health service providers for abused children´s mental health care and therapy trainers in
all 3 partner-countries available online. Data-collective e-mails from therapists and other mental health workers in 3
countries and minutes and participant lists from meetings online in 3 partner-country languages.
Target group for all these deliverables: Project partner organizations and stakeholders, children’s house staff, wider
public.
D4.1 : Report on requirements (conceptual and IT) for the therapy platform tool [5]
Report, in English, Electronic format. Target group: Project partner organisations and stakeholders, children’s house
staff (apx 40 people)
D4.2 : Therapy platform online tool [6]
Online tool will be developed which will be available for specialist after the project ends. Deliverable: tool in
English, publicly accessed and free of charge. Therapy platform with all therapies and other mental health services for
underage victims in 3 partner countries will be accessible to public. Target group: Project partner organisations and
stakeholders, children’s house staff, wider public.
D4.3 : Guide for the therapy platform tool [13]
A manual made in English and in project partner countries' languages. Target group: Project partner organisations and
stakeholders, children’s house staff, wider public.
D4.4 : Toolkit [23]
Crises counselling service provision principles and protocols with relevant agencies to be developed (English,
Estonian, Latvian, Polish), approved by the authorities, made public at relevant websites and ready to be included
into the children’s house model post-project. Target group: Project partner organisations and stakeholders, children’s
house staff, wider public.
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
End of technical development Technical development ended
MS3 1 - MSAE 11
of platform. for therapy platform.
Therapy platform´s how-to-
MS8 How-to-Guide finished. 1 - MSAE 14
guide is ready.
Final assessment of all project
Final assessment of all project
MS9 1 - MSAE 24 activities, incl feedback from
activities
all project members.
Page 24 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
1.3.4. WT4 List of milestones
Due
Milestone WP
Milestone title Lead beneficiary Date (in Means of verification
number18 number9
months)17
Stakeholder meetings 1 First and second stakeholder
MS1 WP1 1 - MSAE 9
and 2 meeting held.
Mid evaluation of Mid evaluation of services
MS2 WP3 3 - FDDS 7
services held in 3 countries.
End of technical
Technical development ended
MS3 development of WP4 1 - MSAE 11
for therapy platform.
platform.
Mid evaluation of Mid-evaluation of trainings in
MS4 WP2 2 - Centrs Dardedze 14
trainings 3 countries.
Final evaluation of Final evaluation of joint
MS5 WP2 2 - Centrs Dardedze 22
joint trainings. trainings in 3 countries.
All stakeholder All stakeholder meetings
MS6 WP1 1 - MSAE 22
meetings held. held.
Final evaluation of Final evaluation of services
MS7 WP3 3 - FDDS 22
services. held in 3 countries.
Therapy platform´s how-to-
MS8 How-to-Guide finished. WP4 1 - MSAE 14
guide is ready.
WP1,
Final assessment of all project
Final assessment of all WP2,
MS9 1 - MSAE 24 activities, incl feedback from
project activities WP3,
all project members.
WP4
Regular partners
administrative and financial
reports. Electronic reports
Administrative and
MS10 WP1 1 - MSAE 24 in English covering all
financial reports
relevant aspects of the project
activities during the reporting
period.
Page 25 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
1.3.5. WT5 Critical Implementation risks and mitigation actions
Risk
Description of risk WP Number Proposed risk-mitigation measures
number
Selection of competent project manager The
Project management meetings of the steering committee will allow
1 WP1
problems. the contracting entity to provide feedback on the
project status.
Regular project team meetings and close
2 Communication problems. WP1 teamwork, use of ICT-tools for daily
communication
Geographical distance Sufficient number of face-to-face meetings.
between project partners Use of the contemporary ICT-means for project
3 WP1, WP2, WP3, WP4
makes project management communication (Skype). Project partners have
communication difficult. long-term experience in international projects.
Insufficient quality of
4 trainings, inadequate training WP2 Selection of professional and experienced trainers.
materials
Participants not interested to The topics tackled reflect the actual need of the
5 WP2
participate in the trainings. participants.
The authorities and network
Intensive networking activities and involvement
members are not interested
of stakeholders to the project delivery process.
6 in introducing the children’s WP2, WP3
Clearly shown benefit of the children’s house
house model and prefer the
model compared to the institutional model.
institutional model.
The services provided in the The services chosen are based on the good
children’s house do not meet practices from countries where the children’s
7 WP3
the needs and expectations of house model has been implemented. Development
the clients. of guidelines.
Insufficient quality of the
evaluation and assessment
8 WP2, WP3, WP4 Selection of professional and experienced experts.
of therapies and counselling
methods.
Potential risk on the
1. Gantt chart with division of activities and
participation of partners
deliverables of each organisation by each Project.
Centrs Dardedze (Latvia)
2. External audit of these partners' costs. 3.
and Poland Empowering
9 WP1, WP2, WP3, WP4 Regular reporting mechanism with the results
Children Foundation (PECF)
from both projects for comparison. clear and
in both projects presented
transparent reporting in the narrative and financial
under this call: BADEV and
reports.
PROMISE II.
Page 26 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
1.3.6. WT6 Summary of project effort in person-months
WP1 WP2 WP3 WP4 Total Person/Months per Participant
1 - MSAE 26.40 12 12 1.25 51.65
2 - Centrs Dardedze 8 12 12 0 32
3 - FDDS 8 12 12 0 32
Total Person/Months 42.40 36 36 1.25 115.65
Page 27 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
1.3.7. WT7 Tentative schedule of project reviews
Review Tentative Planned venue
Comments, if any
number 19 timing of review
at the end of the project when submitting the final
RV1 24
report, reviews may be envisaged.
Page 28 of 28
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
1. Project number
The project number has been assigned by the Commission as the unique identifier for your project. It cannot be
changed. The project number should appear on each page of the grant agreement preparation documents (part A
and part B) to prevent errors during its handling.
2. Project acronym
Use the project acronym as given in the submitted proposal. It can generally not be changed. The same acronym should
appear on each page of the grant agreement preparation documents (part A and part B) to prevent errors during its
handling.
3. Project title
Use the title (preferably no longer than 200 characters) as indicated in the submitted proposal. Minor corrections are
possible if agreed during the preparation of the grant agreement.
4. Starting date
Unless a specific (fixed) starting date is duly justified and agreed upon during the preparation of the Grant Agreement,
the project will start on the first day of the month following the entry into force of the Grant Agreement (NB : entry into
force = signature by the Commission). Please note that if a fixed starting date is used, you will be required to provide a
written justification.
5. Duration
Insert the duration of the project in full months.
6. Call (part) identifier
The Call (part) identifier is the reference number given in the call or part of the call you were addressing, as indicated
in the publication of the call in the Official Journal of the European Union. You have to use the identifier given by the
Commission in the letter inviting to prepare the grant agreement.
7. Abstract
8. Project Entry Month
The month at which the participant joined the consortium, month 1 marking the start date of the project, and all other start
dates being relative to this start date.
9. Work Package number
Work package number: WP1, WP2, WP3, ..., WPn
10. Lead beneficiary
This must be one of the beneficiaries in the grant (not a third party) - Number of the beneficiary leading the work in this
work package
11. Person-months per work package
The total number of person-months allocated to each work package.
12. Start month
Relative start date for the work in the specific work packages, month 1 marking the start date of the project, and all other
start dates being relative to this start date.
13. End month
Relative end date, month 1 marking the start date of the project, and all end dates being relative to this start date.
14. Deliverable number
Deliverable numbers: D1 - Dn
15. Type
Please indicate the type of the deliverable using one of the following codes:
R Document, report
DEM Demonstrator, pilot, prototype
DEC Websites, patent fillings, videos, etc.
OTHER
ETHICS Ethics requirement
ORDP Open Research Data Pilot
16. Dissemination level
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Please indicate the dissemination level using one of the following codes:
PU Public
CO Confidential, only for members of the consortium (including the Commission Services)
EU-RES Classified Information: RESTREINT UE (Commission Decision 2005/444/EC)
EU-CON Classified Information: CONFIDENTIEL UE (Commission Decision 2005/444/EC)
EU-SEC Classified Information: SECRET UE (Commission Decision 2005/444/EC)
17. Delivery date for Deliverable
Month in which the deliverables will be available, month 1 marking the start date of the project, and all delivery dates
being relative to this start date.
18. Milestone number
Milestone number:MS1, MS2, ..., MSn
19. Review number
Review number: RV1, RV2, ..., RVn
20. Installation Number
Number progressively the installations of a same infrastructure. An installation is a part of an infrastructure that could be
used independently from the rest.
21. Installation country
Code of the country where the installation is located or IO if the access provider (the beneficiary or linked third party) is
an international organization, an ERIC or a similar legal entity.
22. Type of access
VA if virtual access,
TA-uc if trans-national access with access costs declared on the basis of unit cost,
TA-ac if trans-national access with access costs declared as actual costs, and
TA-cb if trans-national access with access costs declared as a combination of actual costs and costs on the basis of
unit cost.
23. Access costs
Cost of the access provided under the project. For virtual access fill only the second column. For trans-national access
fill one of the two columns or both according to the way access costs are declared. Trans-national access costs on the
basis of unit cost will result from the unit cost by the quantity of access to be provided.
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Part B
Contents
1. Definition of the problem, needs assessment and objectives of the project ...................................... 2
2. Relevance and justification ............................................................................................................... 7
3. Expected results ............................................................................................................................... 8
4. European added value ...................................................................................................................... 9
5. Methodology ................................................................................................................................... 10
6. Timeline by work package............................................................................................................... 11
7. The partnership and the core project team ..................................................................................... 12
8. Subcontracting ................................................................................................................................ 13
9. Monitoring of the project implementation; risks and measures to mitigate them ............................. 13
10. Evaluation of the project activities, deliverables and results ......................................................... 14
11. Dissemination strategy and communication tools ......................................................................... 15
12. Sustainability and long-term impact of the project results ............................................................. 16
13. Ethical issues related to the project .............................................................................................. 16
14. Mainstreaming .............................................................................................................................. 17
15. Description of child protection policy ............................................................................................. 18
16. English translation of the abstract ................................................................................................. 19
1
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
1. Definition of the problem, needs assessment and objectives of the project
What are the problems and/or the current situation? Which are the needs that the project aims to address?
In relation to these problems and needs, what are the major objectives that the project should attain? Who are the target group(s) of
your activities and why were they chosen?
Note:
You are expected to provide here a needs assessment for your proposed activities. Such needs assessment should include
relevant and reliable data and should contain a robust analysis clearly demonstrating the need for the action. The applicant can
refer to existing research, studies, previous projects which had already identified the need. The needs assessment must make it
clear to what extent the action will meet the need and this shall be quantified. You are requested to be specific and focus on the
actual needs that your project will aim to address and not limit the analysis to general statements and information about the
problems and needs of the target group in general.
Needs assessment
Violence is a grave social problem that has to be fought with at all levels. The negative effects and
outcomes of violence towards individual victims and their close ones sum up in the societal level – lower
life quality, decreased employability, increased treatment costs etc. Research has shown that violence is
regenerative – children who have fallen themselves as victims of violence or witness violent acts are
themselves more likely to be involved in violent activities in their adulthood compared to children having
not such a negative experience. Therefore violence in the context of children must be paid special
attention to.
Abuse of children can be divided as follows:
- Emotional abuse that is causing an emotional state of stress for the child, which can cause serious or
irreversible damage to a child's emotional development. Emotional abuse is the treatment of
the child as worthless, inadequate, unloved and unneeded.
- Physical abuse that is deliberate, non-accidental use of physical force by the parent or a caretaker
of a child, which can injure the child. Physical abuse can cause a child lighter, heavier, or even life
threatening physical and psychological damage. Physical abuse-related activities are as follows:
- Sexual abuse or the involvement of a child in sexual activity the content of which he or she does not
fully understand, to which he or she is not able to give informed consent, and that violates the laws or
social norms of society. Sexual violence against children is a contact or noncontact activity with sexual
need, committed for the purpose of satisfaction of power,
sexual or any other needs by an adult or another child, who by age or level of development
is in a responsible, trust or power relationship with the child.
- Child neglect or non-fulfilment of obligations by a parent or a guardian in taking care of the child's
physical, mental, emotional and social development and that may harm the child's
age-appropriate development and mental and physical health
- Corporal punishment of the child or violence, which is defined as the penalty with the use of physical
force and which is intended to cause pain or discomfort (even a light one) to the child.
The most acute form of abuse of children to be fought against is, of course, sexual abuse that takes place
in many forms. Most prevalent is abuse by a relative or acquaintance, but it can also take the form of
trafficking for sexual exploitation, pornography (including online pornography) and sexual abuse by clergy
and other authority figures. Most studies show females report more abusive experiences than males.
Global / regional prevalence of child sexual abuse A number of studies have reviewed prevalence
rates and suggested global or regional prevalence estimates. For example, Finkelhor (1994) found that
epidemiological studies in 19 countries produced findings similar to North American research (incidence
rates ranging from 7% to 36% for women and 3% to 29% for men).
Lampe (2002) reviewed 24 European studies conducted in Germany, Switzerland, Great Britain, France,
Sweden, Austria, Belgium, Denmark, Finland, the Netherlands and Spain and found overall prevalence
rates of 6% to 36% in girls and 1% to 15% in boys under the age of 16. May-Chahal and Herczog (2003)
2
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
examined a number of European prevalence studies and reported rates of rape were 0.9% for females
and 0.6% for males. When broader definitions of child sexual abuse are used, the rates were 50% for
females and 25% for males. The UN World Report on Violence Against Children reports a World Health
Organization (WHO) estimate that 150 million girls and 73 million boys under 18 experienced forced
sexual intercourse or other forms of sexual violence during 2002 (Ezzati et al., 2004, cited in Pinheiro,
2006). Sexual violence predominantly affected those who had reached puberty or adolescence, and girls
were at greater risk of sexual violence than boys. Pereda et al. (2009) conducted a meta-analysis of 65
child sexual abuse prevalence studies from 22 countries. The analysis showed that 7.9% of men (7.4%
without outliers) and 19.7% of women (19.2% without outliers) had suffered some form of sexual abuse
prior to the age of 18. (Lalor & McElvaney 2010, 26).
Mossige, Ainsaar and Svedin (2007) compare findings from the Baltic Sea regional study on adolescents’
sexuality. Approximately 20 000 young people around age 18 participated. The child sexual abuse
element of the study compares data from respondents in Norway, Sweden, Lithuania, Estonia and Poland
(n= 11 528). Swedish females report high levels of indecent exposure (27%) and indecent touch (56%),
relative to neighbouring countries. Experiences of unwanted sexual intercourse among females range
from 7% (Estonia) to 13.3% (Lithuania). Overall, this large sample of Baltic youth report that 10% have
had unwanted sexual intercourse, 37% have experienced indecent touch and 21.9% report having
experienced indecent exposure. Mossige et al. note that these rates are higher than most international
studies citing the inclusion of peer abuse as a possible explanatory factor. The higher prevalence rates in
men noted in Poland were also found in Sesar et al.’s study in Bosnia and Herzegovina. (Lalor &
McElvaney 2010, 26).
These studies clearly indicate that especially sexual abuse of children is wide-spread across Europe.
Several efforts with remarkable success have been made to combat this phenomenon, but children are
less likely to report or inform adults or authorities about violent acts committed against them compared
to grown-ups. The reasons for that are different: shame, lack of knowledge what and how to do – but also
the complexity of the process. If a violent act against a child has occurred, the investigation could involve
police, doctors, psychologists and other specialists, each working in a separate agency / institution that
deals with a specific aspect in the case. The process could be often long, cumbersome and even
traumatizing to the child victims. This means that too often the cases of violence and abuse go unnoticed
and the perpetrator remains free.
As pointed out, it is not only shame or lack of knowledge that prevents child victims from looking for
help. It is also the complicated system and procedures they have to go through. In other words, the
system has been developed from the institutionalized and authority based approach and does not
necessarily put the issues of child protection and ensuring the rights of the child at its centre. The current
system does not always sufficiently consider “the best interest of the child” and tends to focus primarily
at judicial issues while leaving the specific child-related aspects (providing psychological counselling,
ensuring physical and mental safety, preventing reoffending etc) to the background. So despite all the
efforts made, the system handling cases with child victims of violence is not sufficiently effective or
efficient and yields only partial results.
An alternative to the current solution would be to develop a system where cases involving child victims
of violence are treated at one place – the so-called children’s house or Barnahus model. The model puts
the rights and interests of the child at its centre and provides integrated and multidisciplinary support
that focuses specifically at better reporting, investigation, treatment, follow-up and judicial involvement
in cases of violence against children. It means that cases involving child victims of violence are treated at
the same place avoiding duplication and traumatizing the children as much as possible. In practical terms
the children’s house model combines the judicial activities (i.e. investigating the case and conducting
relevant medical examinations and interviews) with activities aimed at improving the psychosocial wellbeing
of the child and the family (victim therapy, counselling, family counselling, other relevant therapies
etc). The children’s house also works as a networking centre to include, if necessary, other relevant
professionals in the area and acts as a competence centre for developing new services and therapy
delivery models. In other words, the children’s house is a “one stop shop” for providing services and
counselling in cases that involve child victims of violence. This has resulted in the children’s house model
3
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
becoming increasingly popular in Europe due to the enhanced quality of services provided. For example,
the Icelandic case shows that significant improvement has been made in terms of quality of the
procedure: efficient, professional and child friendly response is offered, appropriate therapeutic
interventions are available for child victims, re-victimization has been minimized, different agencies trust
each other and work for the common goal and the public is well-aware of the services provided and has
confidence in their delivery.
The project partner countries have made considerable progress in terms of ensuring high level of child
protection and providing a comprehensive mix of services to prevent violence targeted at children,
detecting it as early as possible, to provide necessary therapy and counselling services to children who
have fallen victim to violence and – needless to say – to punish the perpetrators. In line with the
principles for integrated child protection systems (http://ec.europa.eu/justice/fundamentalrights/
files/rights_child/10_principles_for_integrated_child_protection_systems.pdf), the efforts have
concentrated to setting up easy to access and professional reporting and counselling systems (116 111
helpline, chat and Skype counselling), enhancing the scope of counselling services and guaranteeing the
competence and capacity of specialists working with children, information dissemination among the
wider public on zero tolerance against violence targeted at children and possibilities to find assistance
combined with networking building activities both at national and international level to ensure that all
cases receive due attention.
These efforts have received due attention also at international scale. Estonia was awarded the 2016
annual prize by United Nations partner organisation International Federation for Family Development to
recognize the Estonian commitment to improve the well-being of children and families. A special
notification was made concerning the importance Estonia has attached to children’s rights in its legal
acts. Latvia is distinguished as a country where free state-guaranteed rehabilitation services in cases of
violence are provided to all children regardless of whether the particular offence has led to initiation and
conclusion of criminal proceedings or not. The number of children receiving these services is increasing
annually.
Despite these positive developments it has become clear in all project partner countries that the next
logical step in combating violence targeted at children is to focus more at specific ways of service delivery
or concentrate the services to “one stop”, i.e. to introduce the children’s house model. The three countries
agree upon the need to introduce the new service model, but the progress they have made in
implementing the plan varies. In Estonia the decision for launching the children’s house / Barnahus
model has been taken at state level and piloting will commence in 2017. In Latvia relevant discussions
have been initialized, but no schedule has been agreed upon. In Poland no state-level decision has been
made to launch children’s houses, so initiatives from local governments and civil society organisations
will take place instead. The specific situation and the particular needs of each country are described
below.
In Estonia the issues related to children’s rights and child protection has been on the top of the country’s
political agenda in recent years (see for example the priorities during Estonian presidency of The Council
of The Baltic Sea States (CBSS) 2014-2015, http://www.cbss.org/council/cbss-presidencies/cbssestonian-
presidency-2014-2015/). This has led to numerous initiatives and interventions aimed at
promoting children’s rights, ensuring that each child in need receives due help and attention and paving
way for the establishment of children’s houses in Estonia. For example, child abuse diagnostics system
has been developed and put into effect, an interagency network (consisting of districts prosecutors,
district heads of Police Child Protection Units, medical experts, Ombudsman for Children representatives
of Ministry of Justice, Ministry of Interior, Ministry of Social Affairs, Social Insurance Board Child
Protection Unit and Victim Support Unit, local government specialists, NGO representatives etc) for
enhancing cooperation has been established and 4 regional Children Mental Health Centres set up. Also a
network of different specialists necessary for the establishment of children’s houses has been created,
preliminary trainings conducted and some information materials developed. Of particular importance in
the context of the current call is the PROMISE initiative launched under the auspices of CBSS
(http://www.childcentre.info/promise/) that acts “the agent of change by mobilizing national and local
agencies, governmental and non-governmental, towards establishing Barnahus and child-friendly
4
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
centres” in Europe. It triggered a decision in December 2014 to establish two children’s houses in Estonia
as of January 2017, based on the developed Children Mental Health Centres and involving the interagency
network as cooperation partners and trained specialists as staff.
However, several factors hamper the successful implementation of the children’s house model in Estonia,
which PROMISE I and II and other previous projects didn´t explore:
- Limited capacity of staff to handle specific cases (children with special needs) and lack of “how to”
guidelines
- Low level of knowledge about the model outside the established partnership and especially among
the wider public
- Limited integration of the model with other available services, especially the 116 111 e- and
phone-based counselling
- Insufficient availability of various high-quality intervention and counselling tools and methods
used in the children’s houses
In Latvia the issues of protecting children’s rights and improving the safety and well-being of child
victims have received focused attention during the last years as according to official statistics the number
of crimes committed against children (including sexual abuse cases) has increased by more than 30%.
This evoked specific intervention from the National Expert`s Council (a body consisting of representatives from
Ministry of Welfare, Ministry of Justice, Ministry of Health, Ministry of Interior,
General Prosecutor`s Office, State Police, Forensic Medicine experts, The Latvian Association of Local and
Regional Governments and State Inspectorate of Children`s Rights) that analysed in depth the situation in
Latvia and identified a clear mismatch between the legislation and strategies with everyday practice. The
Latvian Ombudsman`s office also analysed the process and practice of interviewing child victims of
sexual abuse / offences. It reached the conclusion that despite legal requirements such interviews are not
conducted by professionals with specific skills, the interviews usually take place in investigator`s office
and video recording is not used.
These results led to amending certain legal acts (including the Criminal Proceeding Law) to enforce more
child-friendly approach to the process and ensure the proper implementation of the principles of child
friendly justice. Combined with the PROMISE initiative (see above) the Expert`s Council recommended
Children’s House model as a comprehensive solution. In summer 2016 the model was introduced to the
Latvian Crime Prevention Council (CPC) where the approach was approved and the decision was taken
for the Children’s House model to be piloted in Riga / Riga region for a year and based on the experience
gained; develop a plan and methodology for introducing the model across Latvia. However, the piloting
has been delayed as the Parliament did not allocate funds for the 2017 budget.
Summing it up, there is a lack of “child victim rights centred” approach in Latvian criminal proceedings
the specific knowledge of experts how to handle such cases is low and the wider public is not informed
about the pros of the children’s house model, expressed through:
- Lack of specialization while investigating sexual offences
- Lack of child-centred approach while interviewing child victims (interviews are often delayed,
children are not interviewed in child friendly environment and by trained professionals,
additional evidence that rarely actually exist in sexual abuse cases - forensic medicine,
psychologist expert opinion, other witness statements - is required in the court etc).
- Lack of child-friendly approach and cooperation as victims are often interviewed several times by
different institutions (Police, Social service, Custody court, psychologists etc) and not in a logical
correlation with other interventions (e.g. rehabilitation services prior to interviewing).
- Low level of awareness among the Latvian professionals and wider public of the Children’s house
model, its benefits and the underlying principles
- Limited capacity of the justice system representatives and child welfare workers to bring along
the needed changes as they have not been trained to introduce and implement the new model
- No systemic approach or guidelines for therapeutic methods used in working with children and
In Poland, recent research has indicated that there are still many cases where children rights in criminal
cases related to violence are not respected, despite the grim statistics that show 7 out of 10 children
under 17 years old experiencing at least some form of violence, of which 12, 4 % counts for sexual abuse.
5
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
In order to improve the situation, the regulations in the Code of criminal procedure have been adjusted
and improved concerning child-friendly hearings. A child under 15 years of age who was a victim of, or
witness to, domestic or sexual abuse should only be heard once in criminal proceedings and in the
presence of a psychologist Since July 2015, child hearing is obligatorily conducted in an appropriately
prepared room, which in practice are called Friendly Rooms of Child Hearing.
The main problems the Polish society continuously faces are:
- Poland does not have a coherent, centrally-coordinated and comprehensive child protection
system. To an extent, it is possible to reconstruct the child protection system by extracting
protection-oriented child-related elements from other systems, such as the system of alternative
care, social assistance, healthcare, education, and system of combating domestic violence which
has a crucial importance regarding child protection. The system thus obtained proves fragmentary
and “derivative” in character and the absence of a central coordinating body is visible. In other words, the “child
protection system” in Poland will in fact be a combination of elements from
various sub- or related systems. It makes the inter-agency and interdisciplinary cooperation in
cases of child abuse and neglect very difficult.
- In Poland there is no specialized institution responsible for helping children victims of abuse
working with holistic approach. There are no regulations providing free of charge and
professional comprehensive assistance for children victims of abuse and their families including
psychological, medical and legal services. Activities undertaken in this field are implemented
mainly by nongovernmental organizations and by Crisis Centers.
Although no state-level decision has been made in Poland to launch children’s houses, initiatives from
local governments (Warsaw, Starograd) and civil society organisations (Empowering Children
Foundation) have led to the opening of two Child Advocacy Centres in 2017 and two more (in other
locations) in 2018. These centres will closely follow the children’s house approach in its everyday
activities.
To sum it up, all project partner countries have made considerable progress in ensuring the rights of
child and tackling violence targeted at children. However, the current institution-based approach has
reached its limits and the fragmentation it contains hampers the further development of services aimed
at decreasing violence against children at all levels. The momentum gained should not be lost and new
and improved child-centred service delivery model and approach for handling child victims of violence –
the children’s house model – has to be introduced and implemented in the three participating countries.
The needs assessment concerning the project partner countries enables to identify five common
problems related to ensuring children’s rights and tackling violence targeted at children:
1. Lack of one-stop-shop children’s house model for providing services for the child-victims of
violence
2. Lack of knowledge and skills at various levels (national administrative level, experts, network
members etc) for setting up and implementing children’s houses
3. The children’s house workers and network members lack certain skills needed for effective
service provision in the children’s house (interviewing skills, skills for handling children with
special needs etc)
4. Cooperation between relevant specialists is still low at national level (resulting in sustaining the
traditional institution-based model) and even lower at international level (although cases
involving violence towards children have become increasingly cross-border).
5. The services provided to child victims of violence in the project partner countries have not been
analysed for their effectiveness and often rely on the expert opinion of a small circle of experts.
Objectives:
The overall objective of the project is to contribute to the development of integrated child protection systems
and enhanced possibilities to child victims of violence by providing multidisciplinary child-centred approaches in
the project partner countries.
The specific objectives of the project are
• To develop children’s house models in project partner countries fitting to national context.
• To improve knowledge and exchange good practices in partner countries for setting up and
6
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
developing the children’s house model (including the relevant know-how from countries where the model
is already in use) fitting to the national context
• To enhance the capacity of children’s house workers and network members to handle cases involving
child victims of violence (including those with special needs) both effectively and efficiently
• To widen cooperation and networking between relevant specialists (children’s house workers,
police officers etc) at national and international level
• To ensure that only evidence-based service delivery models and methods are used in children’s
houses and to analyse and evaluate the interventions in use.
2. Relevance and justification
How does your project address the call priority under which you are applying? What is the project's contribution in this area?
What are the innovative aspects of the project?
The proposed project addresses directly the call and its priority of ensuring a child-friendly response to
violence against children that is interagency, multidisciplinary and comprehensive (the children’s house
model). As described above, two project partner countries have already decided to introduce the model,
but the progress they have made in its implementation varies just like the range of services offered. The
third partner has witnessed some setbacks in introducing the children’s house approach, but the attitude
towards its implementation is positive. The proposed project takes both these aspects into consideration
and includes therefore activities / results common to all countries as well as country-specific ones to fit
the national context.
The current call provides a perfect possibility for the countries for mutual learning and exchange of good
practices (between each other and from countries having already successfully piloted the children’s
house model) for adapting the principles into national context, capacity building of professionals working
in children’s houses / related networks, establishing and widening co-operation and collaboration
between different national agencies as well as to foster the activities of already established international
networks.
In particular, the project addresses the call priority through:
1. Piloting new services in children’s houses in Estonia and Poland and creating the necessary
preconditions for launching the houses in Latvia
2. Enhancing the professional capacity of children’s house workers and network members, including
disseminating information about the role and possibilities the model contains
3. Developing national networks between different agencies (police, prosecutors, judges, social
workers, child protection authorities, health, mental health and education services) to drop the
institutional model and to move towards the children’s house service delivery approach.
All these activities will be based on cooperation and sharing of good practices between project partners.
Additionally, the proposed project contributes to the following innovative aspects that have insofar
received only limited attention:
1. International network development. Cases involving violence towards children have become
increasingly cross-border (ranging from Internet-based violence to marriages between persons
from different countries). The issue of trafficking child victims has become a major topic to be
tackled (see https://issuu.com/philipishola/docs/guidelines_-_promoting_the_human_ri).
2. Therapy platform development. Although numerous therapies and counselling methods are used
in the process, the vast majority of them have not passed relevant checks concerning them being
evidence-based and / or effective. In the proposed project the used methods from all participating
countries will be collected, analysed, evaluated and made available (in all relevant languages:
Estonian, Latvian, Polish and English) to the project partners. Firstly, this will improve the quality
of service delivery and secondly, it will help to establish a modus operandi for handling certain
specific cases (“if the child has been involved in X, then the best method would be Y”).
3. Including 116 111 helpline (including chat and Skype) counsellors into the children’s house
7
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
service delivery model. In case the 116 111 counsellor receives a contact that requires the
intervention from the children’s house team, he will carry out the preliminary interview according
to the children’s house model regulations and requirements.
3. Expected results
What are the expected results of the project? Who will benefit from these results and how?
How will the target groups of the project benefit concretely from the project results and what shall change for them?
How will these results contribute to achieving the objectives of the call priority under which you are applying?
Note:
Results are immediate changes that arise for the target groups after the completion of the project (e.g. improved knowledge,
increased awareness). Results must be distinguished from deliverables, which are produced with the resources allocated to the
project, e.g. training courses, conferences, leaflets.
The following table reflects the expected results, who will benefit from them and how.
Project result Target group benefiting How will it benefit from results /
what will change
Improved knowledge and Authorities, policy and The proposed project will use the
exchanged good practices in decision makers, children’s available knowledge (academic
partner countries for setting up house workers and network research, strategies and policy
and developing the children’s members (police, documents) and good practices
house model (including the prosecutors, judges, social (from each other, other countries
relevant know-how from countries workers, child protection where the model is in use etc)
where the model is already in use) authorities, health and considering the national context
fitting to the national context education services etc). to develop children’s house
Children fallen victim to model. In Estonia and Poland it
violence means piloting new services in
children’s houses, in Latvia a
roadmap for setting up children’s
house will be developed
Enhanced capacity of children’s Children’s house workers The target group members will
house workers and network and network members pass different trainings involving
members to handle cases Children fallen victim to national and international
involving child victims of violence violence trainers covering a wide range of
(including those with special relevant aspects. Guidelines for
needs) both effectively and handling specific types of cases
efficiently will be developed. Relevant
professionals are ready and
capable of providing relevant
services to child victims of
violence (including children with
special needs, such as disabled
and migrant children
Widened cooperation and Children’s house workers The different information
networking between relevant and network members. activities foreseen in the
specialists (children’s house Wider public. Children fallen dissemination strategy (local and
workers, police, prosecutors, victim to violence international events, information
judges, social workers, child campaigns, trainings, guideline
protection authorities, health and development, networking with
education services etc) at national policy and decision makers at all
8
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
and international level, increased levels etc) will reach stakeholders
awareness about the service in each country. The networking
delivery model in the public. will strengthen the position and
role of the children’s houses in
society and serve as a basis for
further inclusion of additional
services to the model.
Only evidence-based service Children’s house workers The services provided in the
delivery models are used in and network members. children’s house are effective to
children’s houses and the Wider public. Children fallen help the child and his close ones
interventions in use have been victim to violence. and resource efficient in terms of
analysed and evaluated. time and money allocated. The
therapy platform contains
evidence based best practices and
possible solutions / combination
of solutions for handling specific
types of cases.
Summing up, children’s house workers and network members will be the direct beneficiaries of the project.
Through their increased knowledge, skills and capacity they will be able to carry out their tasks more
effectively and efficiently. The trainings will contribute directly to this issue; the training materials
developed will serve as auxiliary material after the project has been completed. The improved cooperation
nationwide will ensure that no cases will be left “unhandled”. The international co-operation will guarantee
that the phenomenon of “rapidly closing-in Europe” will be adequately addressed.
On an impact level the project helps to guarantee that children who have fallen victim to violence receive
adequate support at “one stop” basis by the professional specialists. This will help to curb the reoccurrence
of violence and violent acts of the children in their adulthood.
4. European added value
What is the project's added value at European level?
How will you ensure that the project methodology and/or deliverables and/or results will be transferable at European level?
Note: European added value of actions, including that of small-scale and national actions, shall be assessed in the light of criteria
such as their contribution to the consistent and coherent implementation of Union law, and to wide public awareness about the
rights deriving from it, their potential to develop mutual trust among Member States and to improve cross-border cooperation, their
transnational impact, their contribution to the elaboration and dissemination of best practices or their potential to contribute to the
creation of minimum standards, practical tools and solutions that address cross-border or Union-wide challenges.
Although the conception of children’s house has received positive feedback from in different EU MS, it is
largely still a limited solution been put into practice only in 3 MS. The theoretical justification for
establishing centres with such focus and modus operandi is widely acknowledged (see Rasmusson, B.
Child Ind Res (2011) 4: 301). The practical piloting in Sweden, Denmark and Croatia has yielded positive
outcomes (Svedin, C G., & Landberg, A. https://calio.dspacedirect.org/handle/11212/2186,
http://www.tandfonline.com/action/showCitFormats?doi=10.1080%2F14043858.2012.739323). The
model needs wide-scale piloting under different circumstances and situations: differences in public
sector organisation, politics, legal systems, culture etc must all be taken into consideration before putting
forward a pan-European comprehensive approach.
The European added value will be achieved at two levels:
• Project level. The partnership established to implement the project covers different competencies,
experiences and backgrounds etc., all operating in the same field within the overall EU regulative
9
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
and operational framework. This means that the project outputs training materials, trainings, exchanges
of best-experience, etc. will be composed and delivered from an EU perspective, reflecting the
differences and similarities of the different countries.
•Impact level. The project outputs can be multiplied to any other EU member state according to their
maturity level. The nationwide co-operation model developed can serve as a basis for setting up a
similar system in any other countries. The PROMISE initiative (see above) gives a good example of how
different countries across the Baltic Sea have worked together in a single framework to reach a common
goal.
The project also helps to achieve EU and national policies focused on improving the rights and ensuring
the well-being of children through developing new models of intervention and ensuring the high quality of
services provided.
5. Methodology
Outline the approach and methodology. Explain why this is the best approach to attain the objectives and the proposed results.
Explain the structure and complementarity of the work packages.
The proposed project is divided into 4 complementary workpackages (WP):
1. Management and coordination. The objective of the WP is to ensure the smooth and effective
management of the project, achieving all objectives and results in time and with agreed-upon
quality criteria.
2. Capacity rising, network development and sustainability. The objective of the WP is to ensure that
the children’s house workers and network members have the full capacity to provide various
therapies and interventions effectively and efficiently and to guarantee that all relevant
stakeholders and wider public are aware of the role and possibilities children’s house has in the
society.
3. Enhancing the service delivery in children's houses fitting the national context of project partner
countries. The objective of the WP is to enhance the services offered in children’s houses in
Estonia and Poland and create the preconditions and readiness in Latvia to pilot the model postproject.
Enhancing service delivery´s main goal and impact is the analysis of piloting new services for the vulnerable
target group of traumatized children and their parents. Assessment gives information about target
group´s willingness of using group-therapy, individual therapy for parents and e-counselling as new
forms of counselling. F.e. in Estonia, National Victim Support Service is available for victims of sexual
abuse, but without cost-effectiveness analysis no new services are added.
4. Therapy platform development. The objective of the WP is to map the current therapies and
counselling methods used and to establish a modus operandi for handling certain specific cases
(“if the child has been involved in X, then the best method would be Y”) accordingly.
The WP help to achieve the overall objective of the project by focusing at complementary aspects
necessary for that. The increased knowledge, skills and capacity of children’ house workers and network
members will be achieved through training, guideline development and exchange of best-practices. The
networking activities and information dissemination will ensure that relevant cases will be tackled at
children’s house, making the investigation of the case as smooth and convenient for the child victim as
possible. The interventions, therapies and counselling methods used are evidence-based, evaluated and
adequate for solving specific cases.
The approach and methodology used in each WP is as follows:
1. Strategic planning or the principles of Deming circle known as PDCA (Plan-Do-Check-Adjust) will
be used. A state of play, highlighting the main problems and areas of improvement and intervention
will be compiled (Plan). Then a set of actions to overcome the identified obstacles will be
implemented (Do), followed by internal and external assessment (Check) and recommendations for
further action (Adjust). This wholesome approach ensures the most
10
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
effective and efficient way of solving the problems and achieving the planned results. Project cycle
management (PCM) will be used as a method for achieving the objectives and results of the
project. Following the principles of PCM ensures that resources are used effectively and efficiently
to achieve the pre-determined objectives and results. Using PCM means that the set goals are clear
and measurable, the use of resources co-ordinated, risks properly identified and managed etc
Another important aspect is that PCM requires the active participation of key stakeholders and
aims to promote local ownership.
2. Training. Based on the developed syllabus relevant trainings will be conducted. Kirkpatrick’s
model will be used to assess the effectiveness and efficiency of the trainings.
3. The proposed project will use the available knowledge (academic research, strategies and policy
documents) and good practices (each other, other countries where the model is in use etc)
considering the national context to develop children’s house model. In Estonia and Poland the WP
will focus at actual delivery of services to children who have fallen victim to violence in the
children’s house. The pilot phase will focus at providing family therapy, group counselling,
individual face-to-face counselling in the children’s house and integrating phone / e- counselling
(116 111 service) into the system. In Latvia a roadmap for setting up children’s house will be
developed to be able to provide a wide range of high quality services when the children’s house
will be piloted.
4. Desk-based research and focus-group interviews with stakeholders will be used as the main
methods to analyse and evaluate the current therapies and counselling methods used. Known
evaluation methods (see for example
https://www.childwelfare.gov/topics/systemwide/assessment/family-assess/safety/ or
http://eryica.org/sites/default/files/EURYICA_v2_page%20by%20page_0.pdf) will be used.
Throughout the project the Lundy model of child participation will be used as much as applicable
6. Timeline by work package
Provide in a structured manner the timing of the activities per Work package by using, for instance, a Gantt chart.
YEAR 1 YEAR 2
Workpackage 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Administrative and x x x x x x x x x x x x x x x x x x x x x x x x
financial
management
Information x x x x x x x x x x x x x x x x x x x x x x x x
dissemination
activities
Local stakeholder x x x x
meetings
Workpackage 2.
Join training plan/ X
syllabus
development
Trainings in Estonia x x x x x x x x x x x x x x x x x x
Training in Latvia x x x x x x x x x x x x x x x x x x
Trainings in Poland x x x x x x x x x x x x x x x x x X
Joint trainings x x x x
Guideline and x x x x x x x x x x x x x x x x x x
information material
development
Workpackage 3.
Piloting the service x x x x x x x x x x x x x x x x X
in Estonia
Piloting the service x x x x x x x x x x x x x x x x x
in Latvia
11
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Piloting the service x x x x x x x x x x x x x x x x X
in Poland
Assessing the x x x
service delivery
Workpackage 4.
Collecting and x x x x
assessing therapies
Defining IT X
requirements
Technological x x x x x
platform
development
“How to” guide x x x
development
Fine-tuning the x x x
guide
7. The partnership and the core project team
Describe the partnership of organisations implementing the project (applicant, partners). Explain how the partners were selected, and
why is this partnership the best to attain the objectives of the project. Describe the value of the partnership, its strengths/weaknesses,
the organisational arrangements within the partnership and how you will ensure coordination within the partnership.
Introduce the persons of the core project team and list the CVs (to be attached to the application) of the key people working in the
project (project manager, financial manager and the key experts).
The partnership consists of the following organisations:
• Estonian Ministry of Social Affairs is the coordinator organisation and the national authority responsible for
child protection policy development in Estonia. It also finances and coordinates the nationwide 116 000 and
116 111 helplines and the national development of children´s houses across Estonia.
• NGO Dardedze. NGO Dardedze has more than 15 years of experience in working with child abuse
cases in therapy and almost 10 year experience in child friendly interviewing. Dardezde will be the
coordinating institution and the actual environment of Children`s house in Latvia once the model will
be piloted.
• Poland Empowering Children Foundation (PECF) has been active since 1991. The mission of the NGO is to
work towards making sure that all Children have a safe childhood and are treated with respect for their dignity, as
full-fledged human beings. The NGO aims to protect Children from abuse and help those who have experienced
violence to help them know their rights, believe in themselves, and enjoy their lives through offering psychological
and legal help to abused children and their caregivers, teaching children how to avoid violence and abuse,
teaching adults how to treat children and how to protect them from abuse, telling adults what to do when they
suspect a child might have been abused and influencing the Polish law to ensure the best possible protection of
children’s interests.
The partnership is built upon the previous good cooperation within the PROMISE project. The
partnership also reflects the differences in the state of play regarding the implementation of children’s
house model. For the smooth and effective management a project steering committee (SC) will be set up,
consisting of all partner organisations. SC will monitor the implementation of the project and will take strategic
decisions concerning the project. The SC will be chaired by the applicant, who also will be responsible for
preparation and minutes. SC-meetings will take place 6 times during project. The meetings will be
organised in different project partner countries Additional meetings are to be called for if necessary.
Invitations to corresponding meetings are to be sent within a 3 weeks’ notice. Agenda with underlying documents
will be sent 1 week in advance.
For the operational management the applicant will appoint a project manager and a financial manager,
who will be responsible for the overall administrative and financial management of the project, including
reporting to the financing agency. For each WP, a WP leader will be appointed by responsible partner.
For internal communication email, phone and Skype will be used. Project documents will be stored in a
knowledge management platform accessed through internet by password.
12
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
The core project team (see attached CVs) consists of:
• Project coordinator Ann Lind-Liiberg (MoSA)
• Financial managers Ester Timmas, Pille Erm, Diana Kalvik (MoSA)
• Laura Celmale National coordinator (Dardedze)
• Zaiga Lasmane Project assistant (Dardedze)
• Liga Dolace Project accountant (Dardedze)
Beata Wojtkowska National coordinator
(PECF)
• Ewa Dawidczyk project assistant (PECF)
• Małgorzata Jabłonowska-Zagrajek (PECF)
Also practical experts Anda Avena, Laila Balode, Daina Dziluma, Liga Redliha, Juta Bumbiere, Magdalena
Zawadzka, Alicija Budzynska, Krystyna Nazwisko, Krzysztof Sarzala, Justyna Podlewska, Marta Magdalena
Skierkowska, Joanna Marszal-Kotas.
8. Subcontracting
If applicable, explain the reasons for any subcontracting in your project.
The following activities will be subcontracted:
1. Trainings in Estonia, Latvia and Poland.
2. Some information and media activities.
3. Final conference organisation.
4. Development of therapy platforms (ICT development)
None of the project partner organisations have the necessary competence or skills to carry out the
tasks. While subcontracting the principle of “best value for money” will be followed and competitive
bids taken according to the regulations set out in the Guidelines and grant agreement.
9. Monitoring of the project implementation; risks and measures to mitigate them
How will you ensure that the project is implemented as planned and what methods will you use to monitor its
progress? What are the potential risks and what action do you plan to undertake to mitigate them?
Deming’s Wheel” (PDCA) and Project Cycle Management (PCM) are used to implement the project.
This ensures clear co-ordination and management of the activities and clear procedures for reporting.
The trainings will be evaluated using the Kirkpatrick’s model. The evaluation focuses at four stages:
reaction of the participants, improvement of skills and knowledge, change in behaviour, tangible
results of the training.
RISK MITIGATION
Project management problems Selection of competent project manager
The meetings of the steering committee will
allow the contracting entity to provide
feedback on the project status
Communication problems Regular project team meetings and close
teamwork; use of
ICT-tools for daily communication.
Geographical distance between project Sufficient number of face-to-face meetings.
partners makes project management Use of the contemporary ICT-means for
communication difficult project communication (Skype).
Project partners have long-term experience
in international projects.
13
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Insufficient quality of trainings, inadequate Selection of professional and experienced
training materials trainers.
Participants not interested to participate in The topics tackled reflect the actual need of
the trainings the participants.
The authorities and Network members are Intensive networking activities and
not interested in involvement of stakeholders to the project
introducing the children’s house model and delivery process. Clearly shown
prefer the institutional model. benefit of the children’s house model
compared to the institutional model.
As Project´s leading coordinator after
introducing the proposal first changed and is
now Ministry of Social Affairs, Governmental
organisation responsible for coordinating
children´s houses in Estonia, it improves
contact with governments in other two
member countries and definitely decreases
this risk in Estonia. Co-work with
prosecutors, judges and other law-
enforcement officers also definitely decrease
this risk.
The services provided in the children’s The services chosen are based on the good
house do not meet the needs and practices from countries where the children’s
expectations of the clients. house model has been implemented. Youth
participation in service design.
Insufficient quality of the evaluation and Participation of high-level specialists.
assessment of therapies and counselling
methods.
Potential risk on the participation of partners 1. Gantt chart with division of activities and
Centrs Dardedze (Latvia) and Poland deliverables of each organisation by each
Empowering Children Foundation (PECF) in Project.
both projects presented under this call, 2. External audit of these partners' costs.
BADEV and PROMISE II. 3. Regular reporting mechanism with the
results from both projects for comparison.
clear and transparent reporting in the
narrative and financial reports.
10. Evaluation of the project activities, deliverables and results
How will the project activities, the deliverables and the results be evaluated, and by whom?
Explain which quantitative and qualitative indicators you propose to use for the evaluation of the reach and coverage of project
activities and project results.
Explain what data will be collected, according to what method and at what moments, including feedback from project participants
(satisfaction surveys, evaluation forms, etc).
How will findings be analysed and reported and how will they be used.
Note: For the evaluation of the activities you will be requested to use the participation evaluation questionnaire to be provided by
the Commission.
You must identify which indicators you will use from the list provided in the Indicators excel sheet and include them in the indicators
of your project. You will be asked to report on those indicators as part of the project's Final Report.
Where relevant, data must be disaggregated by gender and by age.
The project will be evaluated at four different levels.
14
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
• Level of activities. The evaluation focuses whether the activities in the project were started and
completed according to the project schedule. The evaluation will take place continuously and is
summarised in the Steering Committee minutes and reports to the financing agency
• Level of outputs. The evaluation focuses on the issue whether all the outputs foreseen in the workpackages
were produced as planned. The evaluation takes place after each output is “completed” and
is summarised in the Steering Committee minutes and reports to the financing agency. For indicators
please see WP 1-4
• Level of results. The evaluation focuses on the issue whether all the results foreseen in the project
plan were achieved. The evaluation takes place during the project (when a major result or “milestone”
has been achieved) and at the end of the project. The results will be summarised in the final
report. The indicators used are
a) Feedback of project participants about the received trainings (to measure results quality);
b) Number of organisations participating in the networks;
c) Number of cases professionally solved in Estonian children’s houses (feedback collected 6
months after the project completion);
• Level of impact. The evaluation takes place after the project has been completed and the project
results and objectives achieved. The evaluation focuses at the whether the increased capacity of
relevant experts in children’s houses and network members has helped to solve the cases more
effectively and efficiently as well as whether the number of such cases has been reduced.
Kirkpatrick’s model will be evaluated to assess all the trainings. It includes feed-back questionnaires
covering both content-related issues of the training (materials, delivery, lecturers etc) and form-related
issues (venue, commodities etc). The feedback will be taken into account in devising trainings within the
project.
If necessary and decided together with participants, external evaluation using same methodology would seem
a proper solution also.
11. Dissemination strategy and communication tools
How do you plan to disseminate (actively spread) information about the project, its activities and its results? Please specify in
particular:
• Communication needs and objectives: What are the communication needs and objectives of the project?
• Target groups and multipliers: What are the target groups? Which stakeholders or other organisations could possibly be
supporters and multipliers of the communication activities?
• Key messages: Which messages will the activities convey in order to meet the communication objectives?
• Distribution channels/tools: Which communicationchannels/tools will be used to convey the messages to your target
groups and multipliers?
• How will your dissemination strategy facilitate further use and transferability of the project results?
Communication needs and objectives, multipliers and key messages
The dissemination strategy will enable to reach the direct target groups (children’s house workers,
police, prosecutors, judges, social workers, child protection authorities, health, mental health and
education services etc) and the general audience with appropriate messages to maximize the impact of
the project and ensure the wider introduction of the children’s house model across Europe. For the direct
target group the communication objective and key messages are to ensure the participation of target
group members in the project and networking activities, to foster smooth cooperation and to exhibit the
strengths of the children’s house model over the traditional institutionalised model. The key messages for
the general audience is to spread the information what services are provided in the children’s house, who
are entitled to benefit from them etc.
Distribution channels /tools.
- Project website and 4 newsletters: MoSA will create the project website (sub-page to
www.sotsiaalkindlustusamet.ee) and will issue 4 newsletter (one every 6 months) to be disseminated to the
project mailing list of stakeholders, including the contacts of all partners and the EU networks.
15
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
- Nationwide stakeholder seminars: 2 seminars will be organised in each country
- Project final conference: The conference will be organised for approximately 100-150
participants, representing different stakeholder groups and other organisations and institutions
involved from all project partner countries and from EU level.
- Media coverage to present the progress of the project. Each partner will guarantee the
involvement of at least 3 local TV, 2 local Radio channels and 4 newspapers in disseminating
information concerning the project. 8 press releases per country (24 in total) and 12 articles per
country (36 in total) will be published.
12. Sustainability and long-term impact of the project results
What is planned as follow-up of the project after the financial support of the European Union has ended? How will the sustainability
of the project's results be assured? Are the project results likely to have a long-term impact? How?
Note: In this part you should not list activities or deliverables of your project, but you should focus on the expected long-term impact
of your project. The long-term impact refers to long-term socio-economic consequences that can be observed after a certain period
following the completion of the project and may affect either the target groups of the project or other groups falling outside the
boundary of the project, who may be winners or losers.
Introducing the children’s house model into the Estonian child protection system has been decided by the
relevant authorities already in 2015. After the EU support has ended, the model will continue to function
financed from the state-budget. The guidelines developed, the therapy platform launched and the cooperation
network established during the project will continue to operate as part of the general service
delivery in Estonia. National co-work with professional schools, universities and other relevant partners to
incorporate the concept of MD/IA service to their curricula is consistent since 2016 and several departments
have made improvements already. National trainings for local child protection specialists, kindergarten- and
school teachers about the topic of child sexual abuse (among other topics) are regular and State-funded in
Estonia. New acknowledgment from this project is included to these curricula.
In Latvia the Barnahus model will be implemented post-project on the basis of developed and piloted
guidelines. Children`s house in Riga will become the main Children`s House and national resource centre.
The Children`s houses in regions are planned to organize on the basis of already existing and functioning
crisis centres, which have the environment and the facilities for forensic interviewing and which will be
already put as further steps in developed guidelines during the project.
In Poland, PECF in cooperation with local authorities will open 2 Children’s homes (Child Advocacy
Centers) in Warsaw and in the polish coast (Starogard) in 2017 and in 2018 in two other locations.
Poland will continue using the counseling methods and guidlines developed in this project. After the
project ends the Polish government will be presented with the project results and also continue to be
influenced in order to improve the Polish child protection system.
The successful piloting of the children’s house model and the implementation of additional therapies in
the already existing module will encourage other EU MS to opt for its introduction as well because they
can see that the module can be easily adapted in each national context.
13. Ethical issues related to the project
Describe any ethical issues which you could come across during the implementation of your project, including with regard to
interactions with target groups or persons benefiting from the project, and present your strategy to address them.
No major ethical issues will be come across during the implementation of the project. The cases tackled
during the trainings (even if based on actual events) will be altered and made anonymous and not
recognisable.
One relevant issue to be taken into account is data protection when involving individuals in activities. The
16
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
current European regulation already provides many safeguards ensuring that data privacy is maintained
throughout any research or service delivery process. By transposing Directive 95/46/EC, Member States
jointly set legally binding rules for the protection of individuals with regard to the processing of personal
data. The European Commission recently drafted a Regulation (European Commission, 2012) with the
intention of comprehensive reform of EU data protection rules. The following assessment is primarily
based on the Directive currently in force (European Parliament, 1995), but is expected to remain
substantially unchanged under the Regulation.
As part of preventive rules for data privacy, all data will be anonymous and all project activities will be
carried out on the basis of declarations of consent, when required.
The consortium acknowledges ‘Guidance note for researchers and evaluators of social science and
humanities’ and national legislation in connection to the collection of personal data will be respected.
These measures are necessary to take because of the nature of using real information to generate data
and thus rely to a large degree on very sensitive information about and statements of individual persons.
14. Mainstreaming
How do you plan to ensure mainstreaming of equality between women and men and the rights of the child, and respect of the
Charter of Fundamental Rightsin the activities of your project?.
The project will ensure mainstreaming of these aspects by:
• Incorporating the gender perspective into project activities. The team of experts represents a
balanced gender mix of experts and the project will promote the integration and active
participation of women in the foreseen research and expected outputs. A gender approach will be
adopted as part of the mainstreaming strategy of equality between women and men and respect of
the Charter of Fundamental Rights.
For example, gender equality is respected while subcontracting national and International experts.
For target group´s point of view, both services are available for both sex victims if they appear to sight of child
protection service with concern about their sexual abuse. All materials about sexual abuse address both girls
and boys and some of materials also address them with certain gender-differ slogans, which are developed
together with police and justice system and are based on local crime statistics. For example human trafficking
or/and very young age sexual relations for girls and internet sexual abuse or/and shame-issues for boys. This
equals them receiving proper help based on their actual needs.
Both mothers and fathers (also same-sex couples) are welcome to receive information and services within this
project. Fathers are targeted by including them more than usually, as in Estonia, Latvia and Poland it is mostly
mother´s role and possibility to receive services and knowledge together with their child(ren). Same-sex
couples are rarely targeted so far in these 3 countries which is a thing this Project changes. Mothers,
especially with low-income and single-parent households have special attention both by Project members and
Project partners in local municipalities.
Unfortunately within Project coordinating team there is a lack of male-members, as majority of employees in
social system, both public and non-governmental organisations, are female.
The project activities follow the principles stated in Charter of Fundamental Rights of European
Union, Article 21, and in particular equal employment opportunities (fostering appropriate mix of
ethnic, religion, age and ability features).
17
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
15. Description of child protection policy
If applicable
If the applicant and/or any of the partners work directly with/have contact with children, provide a description of the child protection
policy of these organisations, covering the following topics:
• purpose of the child protection policy;
• application of the policy (applicable to which staff, in which situations);
• responsibility: who is responsible for ensuring that the policy is adhered to;
• description of recruitment and screening processes with regard to child protection policy (details of training on child
protection policy and rights of the child, screening, vetting (criminal background check). Preventing harm to children:
processes exist to help minimise the possibility of children being abused by those in positions of trust.
Estonian Ministry of Social Affairs is the national authority responsible for child protection policy development
in Estonia and applying the Child Protection Act in Estonia. Also International partner and member of all EU
working groups regarding child´s rights and protection. All Project members are Government´s officials and
obliged to follow all codes of procedure and ethics stated by National law.
NGO Dardedze and NGO Poland Empowering Children Foundation - CHILD PROTECTION POLICY:
The project partners follow in their work with children the principles put forward in the UN “Keeping children
safe. Standards for child protection”.
• All children have equal rights to protection from abuse and exploitation;
• All children should be encouraged to fulfil their potential and inequalities should be challenged;
• Everybody has a responsibility to support the care and protection of children;
• We have a duty of care to children with whom we work and with whom our representatives work
• We follow the “child-centred” approach in all our activities involving children. In
order to keep the standards we follow these principles:
• All workers of NGO Dardedze and NGO Poland Empowering Children Foundation are professionals and
they obey the ethical codes of their profession. We do not hire persons who have been convicted in
connection with crimes involving children or whose professional behaviour has not met the standards.
• All our workers have professional confidentiality
• All our workers have the duty to report relevant authorities of any case where a child has been / is
/ could be in danger.
18
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
16. English translation of the abstract
If applicable
19
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
History of changes between your proposal and
Annex I to the Grant Agreement "Description of the
Action
20
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Please state whether you have made any changes in the data entered in on-line forms in the
participant portal (which will become part A of the Description of the Action) when compared to part B
of the original proposal (Description of workpackages and activities).
Changes suggested in YES/NO1 Concise description of the change(s)
the Evaluation
Summary Report
Other changes YES As NGO, Estonian Advice Centres, stepped back from the
leading position from this project, Ministry of Social
Affairs is ready to replace them as coordinating organisation.
We deleted EAC´s part in our project and took over their
coordinating tasks, including main-coordinating. It includes
partly EAC´s budget.
Please state whether you have made any changes in part B of the Description of the Action when compared
to part B of the original proposal (General Description of the project and applicant organisation).
Changes suggested in YES No of section/page(s), concise description of the change(s):
the Evaluation
Summary Report
P5: Added information about previously EU-funded initiative
PROMISE-project.
P10: Added details about piloting new services.
P14: Added information about a possible risk mentioned in
previous proposal.
P15: Added possibility to use external evaluation as a requested
method.
P16: Added information about long-term impact.
P17. Added information about gender equality perspective.
Other changes YES No of section/page(s), concise description of the change(s):
P12: Deleted description of EAC, replaced it with description of
Ministry of Social Affairs´.
P13: Deleted “translating materials” as it will no longer be a
subcontracted cost.
P13: Update project members: added Ann Lind- Liiberg
as coordinator; Ester Timmas, Pille Erm and Diana Kalvik as
financial managers, Anna Frank-Viron, Viola Läänerand and
Nadezda Leosk as experts.
P14: Added a potential risk of double-financing and the
mitigation measures in case of the 2 partners involved in
PROMISE II and BADEV projects.
P15: Project webpage will be created under subpage of
www.sotsiaalkindlustusamet.ee where is all other
information about 116 111 and Children´s Houses (not
www.abikeskused.ee as in proposal).
P18: Described Ministry´s child protection policy as it differs
from NGO´s.
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Changes in the Portal linked to partner Centre Dardedze:
Added a potential risk of double-financing under the section
“Critical Risks.”
Removed from deliverables and also from Workpackage 2
“Elaborating Children`s House manual in Latvia”.
Added to Workpackage 2: “Implement and evaluate
“Recommendations for Barnahus model in Latvia” in Riga, in
Centre Dardedze (30 cases)”.
Budget: Removed 1500,00 euros from Dardedze budget heading
A2 and 1500,00 euros from their budget heading E2 (upon
deleting the activity “Elaborating Children`s House manual in
Latvia”).
For Centre Dardedze, the EC requested amount was reduced to
66,429.88 € upon reduction of its costs.
1
Delete what is not applicable
21
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Note: Please note that changes to your original proposal should be limited to modifications suggested in the
Evaluation Summary Report. We strongly advise against any other changes at this point as they may lead to the
Commission considering the modified proposal as not compliant with the one recommended for funding and
terminating the grant agreement preparation. Should you wish to introduce some modifications nevertheless (e.g. as a
result of "force majeure" changes that occurred since the date of your original proposal), these must be indicated in
the table. Failure to clearly signal any changes made to your proposal may lead to termination of the grant agreement
preparation or – at any point following the signature of a grant agreement – to the termination of the grant agreement
by the Commission. In accordance with Art. 34.3.1 (i)(ii).
22
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
ESTIMATED BUDGET FOR THE ACTION (page 1 of 2) Associated with document Ref. Ares(2017)6150899 - 14/12/2017
1
Estimated eligible costs (per budget category) EU contribution Action's estimated receipts
A. Direct B. Direct travel and subsistence costs C. Direct [D. Direct costs E. Other direct F. Indirect Total costs Financial
personnel costs costs of of fin. support] costs costs3 Income contributions
Reimbursement Maximum EU Maximum Action’s
subcontracting generated by given by third
rate %4 contribution5 grant amount6 total receipts
the action parties to the
beneficiaries
A.1 B.1 Travel B. Subsistence D.1 Financial E.1
Employees (or support Equipment
equivalent) D.2 Prizes E.2 Other
A.2 Natural goods and
persons under services
direct contract
and seconded
persons
Form of costs7 Actual Actual Actual Unit8 Actual Actual Actual Flat-rate9
f = flat-
g = a + b1
rate *
a b1 [b2] No Total [b2] c [d] e + b2 + h i=g*h j k l m=k+l
(a + b1 +b2
c + [d]+ e + f
+ c + [d] + e)
1. MSAE 62,900.00 6,000.00 6,720.00 44,300.00 0.00 23,200.00 10,018.40 153,138.40 80 122,510.72 122,510.72 0.00 0.00 0.00
2. Centrs 47,667.00 9,570.00 4,168.00 13,000.00 0.00 3,200.00 5,432.35 83,037.35 80 66,429.88 66,429.88 0.00 0.00 0.00
Dardedze
3. FDDS 75,238.00 14,300.00 7,813.00 22,240.00 0.00 1,700.00 8,490.37 129,781.37 80 103,825.10 103,824.00 0.00 0.00 0.00
Total 185,805.00 29,870.00 18,701.00 79,540.00 0.00 28,100.00 23,941.12 365,957.12 80 292,765.70 292,764.60 0.00 0.00 0.00
consortium
1
Grant Agreement number: 764255 — BADEV — REC-CHILD-AG-2016/REC-CHILD-AG-2016-01
ESTIMATED BUDGET FOR THE ACTION (page 2 of 2) Associated with document Ref. Ares(2017)6150899 - 14/12/2017
(1) See Article 6 for the eligibility conditions.
(2) The consortium remains free to decide on a different internal distribution of the EU funding (via the consortium agreement; see Article 25.3)
(3) The indirect costs claimed must be free of any amounts covered by an operating grant (received under any EU or Euratom funding programme). A beneficiary that receives an operating grant during the duration of the action cannot claim any indirect costs for the year(s) covered by the operating grant (see Article 6.2.F)
(4) For the reimbursement rate, see Article 5.2
(5) This is the theoretical amount of the EU contribution, if the reimbursement rate is applied to all the budgeted costs. This theoretical amount is capped by the 'maximum grant amount'
(6) The 'maximum grant amount' is the maximum grant amount decided by the Commission. It normally corresponds to the requested grant, but may be lower
(7) See Article 5 for the cost forms
(8) See Annex 2a 'Additional information on the estimated budget' for the details (units, cost per unit)
(9) For the flat rate, see Article 6.2.F
2
Grant Agreement number: 764255 — BADEV
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
NODIBINAJUMS CENTRS DARDEDZE (Centrs Dardedze), established in CIECERES IELA
3A, RIGA LV-1002, Latvia, (‘the beneficiary’), represented for the purpose of signing this Accession
Form by the undersigned,
hereby agrees
to become beneficiary No (‘2’)
in Grant Agreement No 764255 (‘the Grant Agreement’)
between SOTSIAALMINISTEERIUM and the European Union (‘the EU’), represented by the
European Commission ('the Commission'),
for the action entitled Enhancing Barnahus model service delivery in Estonia, Latvia and Poland
(BADEV).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-919687071_75_210--]
Liena KRUMINA with ECAS id nkrliena signed in the
Participant Portal on 19/12/2017 at 13:51:19 (transaction id
SigId-189349-
CDMVBeOb9zOhcRCKWgecmzzWnBqbWOSPY3fKFWZ9
cmTaMtbuAZAOYpzrXOninAxaVHdGFOfi2akWBbPVTTm
1eTK-PHslUMVSXYCIMrSeUedOzH-
UxImOM6e4cc5UlfO8VfSwygsRtwzWDPFWUhlJ1MiBJI).
Timestamp by third party at
Tue Dec 19 13:51:31 CET 2017
1
Grant Agreement number: 764255 — BADEV
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
FUNDACJA DAJEMY DZIECIOM SILE (FDDS), established in UL. WALECZNYCH 59,
WARSZAWA 03 926, Poland, VAT number: PL1130725676, (‘the beneficiary’), represented for the
purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘3’)
in Grant Agreement No 764255 (‘the Grant Agreement’)
between SOTSIAALMINISTEERIUM and the European Union (‘the EU’), represented by the
European Commission ('the Commission'),
for the action entitled Enhancing Barnahus model service delivery in Estonia, Latvia and Poland
(BADEV).
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 39.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary/new beneficiary/new coordinator
[--TGSMark#signature-951188500_75_210--]
Maria KELLER-HAMELA with ECAS id nklermri signed in
the Participant Portal on 19/12/2017 at 13:52:23
(transaction id SigId-189376-
lQYST5zczwqazahEzsYUeF2noEmjRRXOcMzjYBSlpO9U
wIoSlHn67L9r8oTzziv4dJKbaFMTVBMGI4aTtDIGx0YK-
PHslUMVSXYCIMrSeUedOzH-
tRjDh3dLVLzquL7TkWqNoeV8Vtm9XMzytLJitDWulQBG).
Timestamp by third party at
Tue Dec 19 13:52:33 CET 2017
2
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
i print format A4
MODEL ANNEX 4 JUST MGA — MULTI
landscape
FINANCIAL STATEMENT FOR [BENEFICIARY [name] / AFFILIATED ENTITY [name]] FOR REPORTING PERIOD [reporting period]
1
Eligible costs (per budget category) Receipts EU contribution
Financial
C. Direct costs F. Indirect Income Reimburseme Maximum EU
A. Direct personnel [D. Direct costs of fin. E. Other direct contributions given Requested EU
B. Direct travel and subsistence costs of 2 Total costs generated by Total receipts 3 4
costs support] costs costs by third parties to nt rate % constribution contribution
subcontracting the action
the beneficiaries
A.1 Employees (or [D.1 Financial
B.1 Travel B.2 Subsistence E.1 Equipment
equivalent) support ]
A.2 Natural persons E.2 Other goods
[D.2 Prizes ]
under direct contract and services
and
seconded persons
5 Actual Actual Actual 6 Actual Actual Actual 7
Cost form Unit Flat-rate
f= g=
a b1 [b2] No Total [b2] c [d] e flat-rate * (a + b1 a+ b1 +b2 + c [+ d h i j= h + i k l m
+b2 + c [+d ] + e) ]+e+f
[short name beneficiary /
affiliated entity]
The beneficiary/affiliated entity hereby confirms that:
The information provided is complete, reliable and true.
The costs declared are eligible (see Article 6).
The costs can be substantiated by adequate records and supporting documentation that will be produced upon request or in the context of checks, reviews, audits and investigations (see Articles 12, 13 and 17).
For the last reporting period: that all the receipts have been declared (see Article 5.3.3).
i Please declare all eligible costs, even if they exceed the amounts indicated in the estimated budget (see Annex 2). Only amounts that were declared in your individual financial statements can be taken into account lateron, in order to replace other costs that are found to be ineligible.
1
See Article 6 for the eligibility conditions.
2
The indirect costs claimed must be free of any amounts covered by an operating grant (received under any EU or Euratom funding programme). A beneficiary that receives an operating grant during the duration of the action cannot claim any indirect costs for the year(s) covered by the operating
grant (see Article 6.2.F).
3
See Article 5.2 for the reimbursement rate.
4
This is the theoretical amount of EU contribution that the system calculates automatically (by multiplying the reimbursement rate by the total costs declared). The amount you request (in the column 'requested EU contribution') may be less.
5
See Article 5.2 for the cost forms.
6
See Annex 2a 'Additional information on the estimated budget' for the details (units, cost per unit).
7
See Article 6.2.F for the flat-rate.
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
ANNEX 5
MODEL FOR THE CERTIFICATE ON THE FINANCIAL STATEMENT (CFS)
This document sets out:
- the objectives and scope of the independent report of factual findings on costs declared
under a EU grant agreement financed under the Rights equality and citizenship
Programme 2014-2020 or the Justice Programme 2014-2020 and
- a model for the certificate on the financial statement (CFS).
1. Background and subject matter
[OPTION 1 for actions with one RP and NO interim payments: Within 60 days of the end of
the reporting period, the coordinator must submit to the Commission a final report, which
should include (among other documents and unless otherwise specified in Article 15 of the
Grant Agreement) a certified financial statement (CFS; see proposed model below) for each
beneficiary and (if applicable) each affiliated entity, if:
- the cumulative amount of payments the beneficiary/affiliated entity requests as
reimbursement of actual costs is EUR 325 000 or more and
- the maximum EU contribution indicated for that beneficiary/affiliated entity in the
estimated budget (see Annex 2) as reimbursement of actual costs is EUR 750 000 or
more.]
[OPTION 2 for actions with several RPs and interim payments: Within 60 days of the end
of each reporting period, the coordinator must submit to the Commission a periodic report,
which should include (among other documents and unless otherwise specified in Article 15 of
the Grant Agreement) a certified financial statement (CFS; see proposed model below) for
each beneficiary and (if applicable) each affiliated entity, if:
- the cumulative amount of payments the beneficiary/affiliated entity requests as
reimbursement of actual costs is EUR 325 000 or more and
- the maximum EU contribution indicated for that beneficiary/affiliated entity in the
estimated budget (see Annex 2) as reimbursement of actual costs is EUR 750 000 or
more.
The CFS must be submitted every time the cumulative amount of payments requested (i.e.
including in previous financial statements) reaches the threshold (i.e. a first certificate once
the cumulative amount reaches 325 000, a second certificate once it reaches 650 000, a third
certificate once it reaches 975 000, etc.).
Once the threshold is reached, the CFS must cover all reporting periods for which no
certificate has yet been submitted.]
1
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
The beneficiary must provide the CFS for itself and, if applicable, for its affiliated entity(ies).
The purpose of the audit on which the CFS is based is to give the Commission ‘reasonable
assurance’1 that costs declared as eligible costs under the grant (and, if relevant, receipts
generated in the course of the action) are being claimed by the beneficiary in accordance with
the relevant legal and financial provisions of the Grant Agreement.
The scope of the audit is limited to the verification of eligible costs included in the CFS. The
audit must be conducted in line with point 3 below.
Certifying auditors must carry out the audits in compliance with generally accepted audit
standards and indicate which standards they have applied. They must bear in mind that, to
establish a CFS, they must carry out a compliance audit and not a normal statutory audit. The
eligibility criteria in the Grant Agreement always override normal accounting practices.
The beneficiary and the auditor are expected to address any questions on factual data or
detailed calculations before the financial statement and the accompanying certificate are
submitted. It is also recommended that the beneficiary take into account the auditor’s
preliminary comments and suggestions in order to avoid a qualified opinion or reduce the
scope of the qualifications.
Since the certificate is the main source of assurance for cost claims and payments, it will be
easier to consider amounts as eligible if a non-qualified certificate is provided..
The submission of a certificate does not affect the Commission’s right to carry out its own
assessment or audits. Neither does the reimbursement of costs covered by a certificate
preclude the Commission, the European Anti-Fraud Office or the European Court of Auditors
from carrying out checks, reviews, audits and investigations in accordance with Article 17 of
the Grant Agreement.
The Commission expects the certificates to be issued by auditors according to the highest
professional standards.
2. Auditors who may deliver a certificate
The beneficiary is free to choose a qualified external auditor, including its usual external
auditor, provided that:
- the external auditor is independent from the beneficiary and
- the provisions of Directive 2006/43/EC2 are complied with.
1
This means a high degree of confidence.
2
Directive 2006/43/EC of the European Parliament and of the Council of 17 May 2006 on statutory audits of
annual accounts and consolidated accounts or similar national regulations (OJ L 157, 9.6.2006, p. 87).
2
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Independence is one of the qualities that permit the auditor to apply unbiased judgement and
objective consideration to established facts to arrive at an opinion or a decision. It also means
that the auditor works without direction or interference of any kind from the beneficiary.
Auditors are considered as providing services to the beneficiary under a purchase contract
within the meaning of Article 9 of the Grant Agreement. This means that the costs of the CFS
may normally be declared as costs incurred for the action, if the cost eligibility rules set out in
Articles 6 and 9.1.1 of the Grant Agreement are fulfilled (especially: best value for money and
no conflict of interests; see also below eligibility of costs of other goods and services). Where
the beneficiary uses its usual external auditor, it is presumed that they already have an
agreement that complies with these provisions and there is no obligation to find new bids.
Where the beneficiary uses an external auditor who is not their usual external auditor, it must
select an auditor following the rules set out in Article 9.1.1.
Public bodies can choose an external auditor or a competent public officer. In the latter case,
the auditor’s independence is usually defined as independence from the audited beneficiary
‘in fact and in appearance’. A preliminary condition is that this officer was not involved in
any way in drawing up the financial statements. Relevant national authorities establish the
legal capacity of the officer to carry out audits of that specific public body. The certificate
should refer to this appointment.
3. Audit methodology and expected results
3.1 Verification of eligibility of the costs declared
The auditor must conduct its verification on the basis of inquiry and analysis,
(re)computation, comparison, other accuracy checks, observation, inspection of records and
documents and by interviewing the beneficiary (and the persons working for it).
The auditor must examine the following documentation:
the Grant Agreement and any amendments to it;
the periodical and/or final report(s);
for personnel costs
o salary slips;
o time sheets;
o contracts of employment;
o other documents (e.g. personnel accounts, social security legislation, invoices,
receipts, etc.);
o proofs of payment;
for travel and subsistence costs
o the beneficiary’s internal rules on travel;
o transport invoices and tickets (if applicable);
o declarations by the beneficiary;
o other documents (proofs of attendance such as minutes of meetings, reports,
etc.);
o proofs of payment;
for equipment costs
o invoices;
o delivery slips / certificates of first use;
3
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
o proofs of payment;
o depreciation method of calculation;
for subcontracting
o the call for tender;
o tenders (if applicable);
o justification for the choice of subcontractor;
o contracts with subcontractors;
o invoices;
o declarations by the beneficiary;
o proofs of payment;
o other documents: e.g. national rules on public tendering if applicable, EU
Directives, etc.;
for costs of other goods and services
o invoices;
o proofs of payment; and
o other relevant accounting documents.
General eligibility rules
The auditor must verify that the costs declared comply with the general eligibility rules set out
in Article 6.1 of the Grant Agreement.
In particular, the costs must:
be actually incurred;
be linked to the subject of the Grant Agreement and indicated in the beneficiary's
estimated budget (i.e. the latest version of Annex 2);
be necessary to implement the action which is the subject of the grant;
be reasonable and justified, and comply with the requirements of sound financial
management, in particular as regards economy and efficiency;3
have been incurred during the action, as defined in Article 3 of the Grant Agreement
(with the exception of the invoice for the audit certificate and costs relating to the
submission of the final report);
not be covered by another EU or Euratom grant (see below ineligible costs);
be identifiable, verifiable and, in particular, recorded in the beneficiary's accounting
records and determined according to the applicable accounting standards of the
country where it is established and its usual cost-accounting practices;
comply with the requirements of applicable national laws on taxes, labour and social
security;
be in accordance with the provisions of the Grant Agreement (see, in particular,
Articles 6 and 9-11a) and
have been converted to euro at the rate laid down in Article 15.6 of the Grant
Agreement:
o for beneficiaries with accounts established in a currency other than the euro:
Costs incurred in another currency must be converted into euros at the average
of the daily exchange rates published in the C series of the EU Official Journal
determined over the corresponding reporting period.
3
To be assessed in particular on the basis of the procurement and selection procedures for service providers.
4
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
If no daily euro exchange rate is published in the EU Official Journal for the
currency in question, the rate used must be the average of the monthly
accounting rate established by the Commission and published on its website;
o for beneficiaries with accounts established in euro:
Costs incurred in another currency should be converted into euros applying the
beneficiary’s usual accounting practice.
The auditor must verify whether expenditure includes VAT and, if so, verify that the
beneficiary:
- cannot recover the VAT (this must be supported by a statement from the competent
body) and
- is not a public body acting as a public authority.
The auditor should base his/her audit approach on the confidence level following a review of
the beneficiary's internal control system. When using sampling, the auditor should indicate
and justify the sampling size.
Specific eligibility rules
In addition, the auditor must verify that the costs declared comply with the specific cost
eligibility rules set out in Article 6.2 and Articles 9.1.1, 10.1.1, 11.1.1, 11a.1.1 and 11a.2.1 of
the Grant Agreement.
Personnel costs
The auditor must verify that:
personnel costs have been charged and paid in respect of the actual time devoted by
the beneficiary’s personnel to implementing the action (justified on the basis of time
sheets or other relevant time-recording system);
personnel costs were calculated on the basis of annual gross salary, wages or fees (plus
obligatory social charges, but excluding any other costs) specified in an employment
or other type of contract, not exceeding the average rates corresponding to the
beneficiary’s usual policy on remuneration;
the work was carried out during the period of implementation of the action, as defined
in Article 3 the Grant Agreement;
the personnel costs are not covered by another EU or Euratom grant (see below
ineligible costs);
for additional remunerations: the 2 conditions set out in Article 6.2.A.1 of the Grant
Agreement are met (i.e. that it is part of the beneficiary’s usual remuneration practices
and is paid in a consistent manner whenever the same kind of work or expertise is
required and that the criteria used to calculate the supplementary payments are
objective and generally applied by the beneficiary, regardless of the source of funding
used);
for in-house consultants: the 3 conditions set out in Article 6.2.A.2 of the Grant
Agreement are met (i.e. that the in-house consultant works under the beneficiary’s
instructions, that the result of the work carried out belongs to the beneficiary, and that
the costs are not significantly different from those for personnel performing similar
tasks under an employment contract).
5
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
The auditor should have assurance that the management and accounting system ensures
proper allocation of the personnel costs to various activities carried out by the beneficiary and
funded by various donors.
Travel and subsistence costs
The auditor must verify that travel and subsistence costs:
have been charged and paid in accordance with the beneficiary's internal rules or usual
practices (or, in the absence of such rules or practices, that they do not exceed the
scale normally accepted by the Commission4;
are not covered by another EU or Euratom grant (see below ineligible costs)
were incurred for travels linked to action tasks set out in Annex 1 of the Grant
Agreement;
were incurred in the eligible countries set out in the call for proposals.
Equipment costs
The auditor must verify that:
the equipment was acquired during the period of implementation of the action, as
defined in Article 3 of the Grant Agreement;
the equipment is purchased, rented or leased at normal market prices;
public bodies have complied with the national rules on public procurement;
the equipment is written off, depreciation has been calculated according to the tax and
accounting rules applicable to the beneficiary and only the portion of the depreciation
corresponding to the duration of the action has been declared and
the costs are not covered by another EU or Euratom grant (see below ineligible costs).
Costs of other goods and services
The auditor must verify that:
the purchase complies with best value for money (or lowest price) and that there was
no conflict of interests;
public bodies have complied with the national rules on public procurement;
the costs are not covered by another EU or Euratom grant (see below ineligible costs).
Subcontracting costs
The auditor must verify that:
the subcontracting complies with best value for money (or lowest price) and that there
was no conflict of interests;
the subcontracting was necessary to implement the action for which the grant is
requested;
the subcontracting was provided for in Annex 1 and Annex 2 or agreed to by the
Commission at a later stage;
4
See the Guide for Applicants — Action Grants.
6
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
the subcontracting is supported by accounting documents in accordance with national
accounting law;
public bodies have complied with the national rules on public procurement.
Ineligible costs
The auditor must verify that the beneficiary has not declared any costs that are ineligible
under Article 6.4 of the Grant Agreement:
costs relating to return on capital;
debt and debt service charges;
provisions for future losses or debts;
interest owed;
doubtful debts;
currency exchange losses;
bank costs charged by the beneficiary’s bank for transfers from the Commission;
excessive or reckless expenditure;
deductible VAT;
VAT incurred by a public body acting as a public authority;
costs incurred during suspension of the implementation of the action;
in-kind contributions from third parties;
costs declared under other EU or Euratom grants (including those awarded by a
Member State and financed by the EU or Euratom budget or awarded by bodies other
than the Commission for the purpose of implementing the EU or Euratom budget); in
particular, indirect costs if the beneficiary is already receiving an operating grant
financed by the EU or Euratom budget in the same period;
costs incurred for permanent staff of a national administration for activities that are
part of its normal activities (i.e. not undertaken only because of the grant);
costs incurred for staff or representatives of EU institutions, bodies or agencies;
costs for activities that do/did not take place in one of the eligible countries specified
in the call for proposals (unless approved by the Commission).
For more information on cost eligibility, see the Guide for applicants — Action Grants.
3.2 Verification of receipts
The auditor must verify that the beneficiary has declared receipts within the meaning of
Article 5.3.3 of the Grant Agreement, i.e.:
income generated by the action (e.g. from the sale of products, services and
publications, conference fees) and
financial contributions given by third parties, specifically to be used for costs that are
eligible under the action.
3.3 Verification of the beneficiary’s accounting system
The auditor must verify that:
the accounting system (analytical or other suitable internal system) makes it possible
to identify sources of financing for the action and related expenses incurred during
the contractual period and
7
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
expenses/income under the grant have been recorded systematically using a
numbering system that distinguishes them from expenses/income for other projects.
8
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
Certificate on the financial statement (CFS)
To
[Beneficiary/affiliated entity’s full name
address]
We, [full name of the audit firm/organisation], established in [full address/city/country],
represented for signature of this audit certificate by [name and function of an authorised
representative],
hereby certify
that:
1. We have conducted an audit relating to the costs declared in the financial statement of
[name of beneficiary/affiliated entity] (the [‘beneficiary’][‘affiliated entity’]), to which
this audit certificate is attached and which is to be presented to the European Commission
under Grant Agreement No [insert number] — [insert acronym], covering costs for the
following reporting period(s): [insert reporting period(s)].
2. We confirm that our audit was carried out in accordance with generally accepted
auditing standards in compliance with ethical rules and on the basis of the provisions of
the Grant Agreement and its Annexes (and in particular the audit methodology
described in Annex 5).
3. The financial statement was examined and all necessary tests of [all][[X]%] of the
supporting documentation and accounting records were carried out in order to obtain
reasonable assurance that, in our opinion and on the basis of our audit
total costs of EUR [insert number] ([insert amount in words]) are eligible, i.e.:
actual;
determined in accordance with the [beneficiary’s][affiliated entity’s]
accounting principles;
incurred during the period referred to in Article 3 of the Grant Agreement;
recorded in the [beneficiary’s][affiliated entity’s] accounts (at the date of this
audit certificate);
comply with the specific eligibility rules in Article 6.2 of the Grant Agreement;
do not contain costs that are ineligible under Article 6.4 of the Grant
Agreement, in particular:
costs relating to return on capital;
debt and debt service charges;
provisions for future losses or debts;
interest owed;
doubtful debts;
currency exchange losses;
bank costs charged by the [beneficiary’s][affiliated entity’s] bank for
transfers from the Commission
excessive or reckless expenditure;
9
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
deductible VAT;
VAT incurred by a public body acting as a public authority;
costs incurred during suspension of the implementation of the action;
in-kind contributions provided by third parties;
costs declared under other EU or Euratom grants (including those
awarded by a Member State and financed by the EU or Euratom budget
or awarded by bodies other than the Commission for the purpose of
implementing the EU or Euratom budget); in particular, indirect costs if
the [beneficiary][affiliated entity] is already receiving an operating
grant financed by the EU or Euratom budget in the same period;
costs incurred for permanent staff of a national administration, for
activities that are part of its normal activities (i.e. not undertaken only
because of the grant);
costs incurred for staff or representatives of EU institutions, bodies or
agencies;
costs for activities that do not take place in one of the eligible countries
specified in the call for proposals (unless approved by the
Commission);
[are claimed according to the euro conversion rate referred to in Article 15.6 of
the Grant Agreement;]
total receipts of EUR [insert number] ([insert amount in words]) have been declared
under Article 5.3.3 of the Grant Agreement and
the [beneficiary’s][affiliated entity’s] accounting procedures are in compliance with
the accounting rules of the state in which it is established and permit direct
reconciliation of the costs incurred for the implementation of the action covered by the
EU grant with the overall statement of accounts relating to its overall activity.
[However, our audit opinion is qualified for:
costs of EUR [insert number]
receipts of EUR [insert number]
which in our opinion do not comply with the applicable rules.]
4. We are qualified/authorised to deliver this audit certificate [(for additional information,
see appendix to this certificate)].
5. The [beneficiary][affiliated entity] paid a price of EUR [insert number]) (including VAT
of EUR [insert number]) for this audit certificate. [OPTION 1: These costs are eligible
(i.e. incurred within 60 days of the end of the action referred to in Article 3 of the Grant
Agreement) and included in the financial statement.][OPTION 2: These costs were not
included in the financial statement.]
Date, signature and stamp
10
Associated with document Ref. Ares(2017)6150899 - 14/12/2017
ANNEX 7
[OPTION 1 if further pre-financing payments foreseen in Article 15.2a:
MODEL FOR THE STATEMENT ON THE USE OF THE PREVIOUS
PRE-FINANCING PAYMENT
For fields in [grey in square brackets]: enter the appropriate data
STATEMENT ON THE USE OF THE FIRST PRE-FINANCING PAYMENT
(To be filled out by the coordinator)
The undersigned:
- declares that […] % of the first pre-financing payment of EUR [insert amount] paid for
Grant Agreement No [insert number] — [acronym] have been used,
- declares that this is based on substantiated data (bank slip/treasury account) provided by
each beneficiary,
- certifies that the information contained in the progress report is full, reliable and true,
and is substantiated by adequate supporting documentation that can be produced in the
context of checks, reviews, audits and investigations,
- requests a second pre-financing payment of EUR [insert amount].
SIGNATURE
For the coordinator:
[electronic signature]
Done on [electronic time stamp] ]
[OPTION 2: Not applicable]
1
Digitally sealed by the European Commission
Date: 2017.12.14 16:40:20 CET
This document is digitally sealed. The digital sealing mechanism uniquely binds the
document to the modules of the Participant Portal of the European Commission, to the
transaction for which it was generated and ensures its integrity and authenticity.
Any attempt to modify the content will lead to a breach of the electronic seal, which can
be verified at any time by clicking on the digital seal validation symbol.
Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. +32 22991111