Sotsiaalministeerium · 7. detsember 2017
Sisu (failidest)
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
EUROPEAN COMMISSION
DIRECTORATE-GENERAL RESEARCH & INNOVATION
Health
Innovative and Personalised Medicine
GRANT AGREEMENT
NUMBER — 779282 — ERA PerMed
This Agreement (‘the Agreement’) is between the following parties:
on the one part,
the European Union (‘the EU’), represented by the European Commission ('the Commission'),
represented for the purposes of signature of this Agreement by the Head of Unit, DIRECTORATE-
GENERAL RESEARCH & INNOVATION , Health, Administration and finance, Mila BAS
SANCHEZ,
and
on the other part,
1. ‘the coordinator’:
INSTITUTO DE SALUD CARLOS III (ISCIII), established in MONFORTE DE LEMOS 5,
MADRID 28029, Spain, VAT number: ESQ2827015E, represented for the purposes of signing the
Agreement by JESUS F.CRESPO
and the following other beneficiaries, if they sign their ‘Accession Form’ (see Annex 3 and Article 56):
2. FONDS ZUR FÖRDERUNG DER WISSENSCHAFTLICHEN FORSCHUNG (FWF),
established in SENSENGASSE 1, WIEN 1090, Austria, VAT number: ATU37675903,
3. CANADIAN INSTITUTES OF HEALTH RESEARCH (CIHR), established in ELGIN STREET
9TH FLOOR ADDRESS LOCATOR 4809A 160, OTTAWA ONTARIO K1T 4H8, Canada, as
‘beneficiary not receiving EU funding’ (see Article 9),
4. FONDS DE RECHERCHE DU QUEBEC - SANTE (FRQS (Quebec)), established in RUE
SHERBROOKE OUEST 500, MONTREAL QUEBEC H3A3C6, Canada, as ‘beneficiary not receiving
EU funding’ (see Article 9),
5. MINISTARSTVO ZNANOSTI I OBRAZOVANJA (MZOS), established in Donje Svetice 38,
ZAGREB 10000, Croatia,
6. INNOVATIONSFONDEN (InnoFond), established in OSTERGADE 26 A, KOBENHAVN K
1100, Denmark, VAT number: DK29035695,
7. SIHTASUTUS EESTI TEADUSAGENTUUR (ETAg), established in SOOLA 8, TARTU 51013,
Estonia,
1
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
8. SOTSIAALMINISTEERIUM (MSAE), established in Suur-Ameerika 1, TALLINN 10122,
Estonia,
9. SUOMEN AKATEMIA (AKA), established in HAKANIEMENRANTA 6, HELSINKI 00531,
Finland, VAT number: FI02458939,
10. AGENCE NATIONALE DE LA RECHERCHE (ANR), established in 50 avenue Daumesnil,
PARIS 75012, France,
11. BUNDESMINISTERIUM FUER BILDUNG UND FORSCHUNG (BMBF), established in
Heinemannstrasse 2, BONN 53175, Germany,
12. DEUTSCHES ZENTRUM FUER LUFT - UND RAUMFAHRT EV (DLR), established in
Linder Hoehe, KOELN 51147, Germany,
13. BUNDESMINISTERIUM FUER GESUNDHEIT (BMG), established in ROCHUSTRASSE
1, BONN 53123, Germany,
14. SACHSISCHES STAATSMINISTERIUM FUR WISSENSCHAFT UND KUNST (SMWK),
established in WIGARDSTRASSE 17, Dresden 01097, Germany,
15. NEMZETI KUTATASI FEJLESZTESI ES INNOVACIOS HIVATAL (NKFIH), established
in KETHLY ANNA TER 1, BUDAPEST 1077, Hungary, VAT number: HU15831000,
16. THE HEALTH RESEARCH BOARD (HBR), established in LOWER BAGGOT STREET 73,
DUBLIN 2, Ireland, VAT number: IE4820764P,
17. MINISTRY OF HEALTH (CSO-MOH), established in YIRMIYAHU 39, JERUSALEM
9101002, Israel,
18. MINISTERO DELLA SALUTE (IT-MoH), established in Via Giorgio Ribotta 5, ROMA 00144,
Italy, VAT number: N/A,
19. FONDAZIONE REGIONALE PER LA RICERCA BIOMEDICA (FRRB), established in
PIAZZA CITTA DI LOMBARDIA 1, MILANO 20124, Italy, VAT number: IT97608860157,
20. VALSTS IZGLITIBAS ATTISTIBAS AGENTURA (VIAA), established in VALNU IELA 1,
RIGA 1050, Latvia,
21. FONDS NATIONAL DE LA RECHERCHE (FNR), established in 2 AVENUE DE
L'UNIVERSITE, ESCH-SUR-ALZETTE 4365, Luxembourg, VAT number: LU20686731,
22. NORGES FORSKNINGSRAD (RCN), established in DRAMMENSVEIEN 288, OSLO 0283,
Norway, VAT number: NO970141669MVA,
23. NARODOWE CENTRUM BADAN I ROZWOJU (NCBR), established in UL.
NOWOGRODZKA 47A, WARSZAWA 00 695, Poland, VAT number: PL7010073777,
24. Unitatea Executiva pentru Finantarea Invatamantului Superior, a Cercetarii, Dezvoltarii si
Inovarii (UEFISCDI), established in Mendeleev Street 21-25, Bucharest 010362, Romania,
25. Ministrstvo za izobrazevanje, znanost in sport (MIZS), established in Masarykova 16,
Ljubljana 1000, Slovenia, VAT number: SI14246821,
2
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
26. CENTRO PARA EL DESARROLLO TECNOLOGICO INDUSTRIAL. (CDTI), established
in CALLE CID 4, MADRID 28001, Spain,
27. DEPARTAMENT DE SALUT - GENERALITAT DE CATALUNYA (DS-CAT), established
in Trav. de les Corts (Pavelló Ave Maria) 131-159, BARCELONA 08028, Spain,
28. COMUNIDAD FORAL DE NAVARRA - GOBIERNO DE NAVARRA (GN), established in
AVENIDA CARLOS III 2, PAMPLONA 31002, Spain, VAT number: ESS3100000C,
29. VETENSKAPSRADET - SWEDISH RESEARCH COUNCIL (SRC), established in
VASTRA JARNVAGSGATAN 3, STOCKHOLM 111 64, Sweden, VAT number: SE202100520801,
30. ZORGONDERZOEK NEDERLAND ZON (ZON), established in Laan Van Nieuw Oost Indie
334, DEN HAAG 2593CE, Netherlands,
31. TURKIYE BILIMSEL VE TEKNOLOJIK ARASTIRMA KURUMU (TUBITAK),
established in Ataturk Bulvari 221, ANKARA 06100, Turkey, VAT number: TR1750003600,
Unless otherwise specified, references to ‘beneficiary’ or ‘beneficiaries’ include the coordinator.
The parties referred to above have agreed to enter into the Agreement under the terms and conditions
below.
By signing the Agreement or the Accession Form, the beneficiaries accept the grant and agree to
implement it under their own responsibility and in accordance with the Agreement, with all the
obligations and conditions it sets out.
The Agreement is composed of:
Terms and Conditions
Annex 1 Description of the action
Annex 2 Estimated budget for the action
2a Additional information on the estimated budget
Annex 3 Accession Forms
Annex 4 Model for the financial statements
Annex 5 Model for the certificate on the financial statements (CFS)
Annex 6 Model for the certificate on the methodology
Annex 7 Model for the commitment on availability of funds
Annex 8 Model for the statement on the use of the previous pre-financing instalment
3
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
TERMS AND CONDITIONS
TABLE OF CONTENTS
CHAPTER 1 GENERAL ............................................................................................................................................. 12
ARTICLE 1 — SUBJECT OF THE AGREEMENT.......................................................................................12
CHAPTER 2 ACTION .................................................................................................................................................12
ARTICLE 2 — ACTION TO BE IMPLEMENTED ......................................................................................12
ARTICLE 3 — DURATION AND STARTING DATE OF THE ACTION....................................................12
ARTICLE 4 — ESTIMATED BUDGET AND BUDGET TRANSFERS.......................................................12
4.1 Estimated budget.................................................................................................................................. 12
4.2 Budget transfers....................................................................................................................................12
CHAPTER 3 GRANT .................................................................................................................................................. 12
ARTICLE 5 — GRANT AMOUNT, FORM OF GRANT, REIMBURSEMENT RATES AND FORMS OF
COSTS............................................................................................................................................12
5.1 Maximum grant amount....................................................................................................................... 12
5.2 Form of grant, reimbursement rates and forms of costs......................................................................12
5.3 Final grant amount — Calculation.......................................................................................................13
5.4 Revised final grant amount — Calculation......................................................................................... 15
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS................................................................................15
6.1 General conditions for costs to be eligible.......................................................................................... 15
6.2 Specific conditions for costs to be eligible..........................................................................................16
6.3 Conditions for costs of linked third parties to be eligible................................................................... 22
6.4 Conditions for in-kind contributions provided by third parties free of charge to be eligible............... 22
6.5 Ineligible costs......................................................................................................................................22
6.6 Consequences of declaration of ineligible costs.................................................................................. 22
CHAPTER 4 RIGHTS AND OBLIGATIONS OF THE PARTIES ........................................................................ 23
SECTION 1 RIGHTS AND OBLIGATIONS RELATED TO IMPLEMENTING THE ACTION ................ 23
ARTICLE 7 — GENERAL OBLIGATION TO PROPERLY IMPLEMENT THE ACTION.........................23
7.1 General obligation to properly implement the action.......................................................................... 23
7.2 Consequences of non-compliance........................................................................................................ 23
ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD PARTIES INVOLVED IN THE
ACTION.........................................................................................................................................23
ARTICLE 9 — IMPLEMENTATION OF ACTION TASKS BY BENEFICIARIES NOT RECEIVING EU
FUNDING...................................................................................................................................... 23
9.1 Rules for the implementation of action tasks by beneficiaries not receiving EU funding................... 23
4
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
9.2 Consequences of non-compliance........................................................................................................ 24
ARTICLE 10 — PURCHASE OF GOODS, WORKS OR SERVICES..........................................................24
10.1 Rules for purchasing goods, works or services................................................................................. 24
10.2 Consequences of non-compliance...................................................................................................... 24
ARTICLE 11 — USE OF IN-KIND CONTRIBUTIONS PROVIDED BY THIRD PARTIES AGAINST
PAYMENT..................................................................................................................................... 25
11.1 Rules for the use of in-kind contributions against payment.............................................................. 25
11.2 Consequences of non-compliance...................................................................................................... 25
ARTICLE 12 — USE OF IN-KIND CONTRIBUTIONS PROVIDED BY THIRD PARTIES FREE OF
CHARGE........................................................................................................................................25
12.1 Rules for the use of in-kind contributions free of charge..................................................................25
12.2 Consequences of non-compliance...................................................................................................... 26
ARTICLE 13 — IMPLEMENTATION OF ACTION TASKS BY SUBCONTRACTORS........................... 26
13.1 Rules for subcontracting action tasks................................................................................................ 26
13.2 Consequences of non-compliance...................................................................................................... 26
ARTICLE 14 — IMPLEMENTATION OF ACTION TASKS BY LINKED THIRD PARTIES....................27
ARTICLE 15 — SUPPORT TO OR IMPLEMENTATION OF TRANS-NATIONAL PROJECTS...............27
15.1 Rules for providing support to or implementation of trans-national projects.................................... 27
15.2 Consequences of non-compliance...................................................................................................... 28
ARTICLE 16 — PROVISION OF TRANS-NATIONAL OR VIRTUAL ACCESS TO RESEARCH
INFRASTRUCTURE.....................................................................................................................28
SECTION 2 RIGHTS AND OBLIGATIONS RELATED TO THE GRANT ADMINISTRATION .............. 28
ARTICLE 17 — GENERAL OBLIGATION TO INFORM............................................................................28
17.1 General obligation to provide information upon request...................................................................28
17.2 Obligation to keep information up to date and to inform about events and circumstances likely to
affect the Agreement........................................................................................................................... 28
17.3 Consequences of non-compliance...................................................................................................... 29
ARTICLE 18 — KEEPING RECORDS — SUPPORTING DOCUMENTATION........................................ 29
18.1 Obligation to keep records and other supporting documentation...................................................... 29
18.2 Consequences of non-compliance...................................................................................................... 30
ARTICLE 19 — SUBMISSION OF DELIVERABLES................................................................................. 30
19.1 Obligation to submit deliverables...................................................................................................... 31
19.2 Consequences of non-compliance...................................................................................................... 31
ARTICLE 20 — REPORTING — PAYMENT REQUESTS..........................................................................31
20.1 Obligation to submit reports.............................................................................................................. 31
20.2 Reporting periods............................................................................................................................... 31
5
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
20.2a Periodic reports — Requests for second pre-financing payment.....................................................31
20.3 Request for interim payments............................................................................................................ 32
20.4 Final report — Request for payment of the balance......................................................................... 32
20.5 Information on cumulative expenditure incurred...............................................................................34
20.6 Currency for financial statements and conversion into euro............................................................. 34
20.7 Language of reports............................................................................................................................34
20.8 Consequences of non-compliance...................................................................................................... 34
ARTICLE 21 — PAYMENTS AND PAYMENT ARRANGEMENTS..........................................................34
21.1 Payments to be made......................................................................................................................... 34
21.2 Pre-financing payment — Amount — Amount retained for the Guarantee Fund............................. 35
21.3 Interim payments — Amount — Calculation....................................................................................35
21.4 Payment of the balance — Amount — Calculation — Release of the amount retained for the
Guarantee Fund....................................................................................................................................35
21.5 Notification of amounts due...............................................................................................................36
21.6 Currency for payments....................................................................................................................... 36
21.7 Payments to the coordinator — Distribution to the beneficiaries......................................................36
21.8 Bank account for payments................................................................................................................36
21.9 Costs of payment transfers.................................................................................................................37
21.10 Date of payment............................................................................................................................... 37
21.11 Consequences of non-compliance.................................................................................................... 37
ARTICLE 22 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION OF
FINDINGS..................................................................................................................................... 37
22.1 Checks, reviews and audits by the ................................................................................................... 37
22.2 Investigations by the European Anti-Fraud Office (OLAF)..............................................................39
22.3 Checks and audits by the European Court of Auditors (ECA)..........................................................40
22.4 Checks, reviews, audits and investigations for international organisations....................................... 40
22.5 Consequences of findings in checks, reviews, audits and investigations — Extension of
findings.................................................................................................................................................40
22.6 Consequences of non-compliance...................................................................................................... 42
ARTICLE 23 — EVALUATION OF THE IMPACT OF THE ACTION....................................................... 42
23.1 Right to evaluate the impact of the action.........................................................................................42
23.2 Consequences of non-compliance...................................................................................................... 42
SECTION 3 RIGHTS AND OBLIGATIONS RELATED TO BACKGROUND AND RESULTS ................. 42
SUBSECTION 1 GENERAL ............................................................................................................................42
ARTICLE 23a — MANAGEMENT OF INTELLECTUAL PROPERTY...................................................... 42
6
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
23a.1 Obligation to take measures to implement the Commission Recommendation on the management
of intellectual property in knowledge transfer activities.....................................................................42
23a.2 Consequences of non-compliance.................................................................................................... 43
SUBSECTION 2 RIGHTS AND OBLIGATIONS RELATED TO BACKGROUND ................................ 43
ARTICLE 24 — AGREEMENT ON BACKGROUND..................................................................................43
24.1 Agreement on background................................................................................................................. 43
24.2 Consequences of non-compliance...................................................................................................... 43
ARTICLE 25 — ACCESS RIGHTS TO BACKGROUND............................................................................ 43
25.1 Exercise of access rights — Waiving of access rights — No sub-licensing......................................43
25.2 Access rights for other beneficiaries, for implementing their own tasks under the action.................43
25.3 Access rights for other beneficiaries, for exploiting their own results.............................................. 44
25.4 Access rights for affiliated entities.................................................................................................... 44
25.5 Access rights for third parties............................................................................................................ 45
25.6 Consequences of non-compliance...................................................................................................... 45
SUBSECTION 3 RIGHTS AND OBLIGATIONS RELATED TO RESULTS ........................................... 45
ARTICLE 26 — OWNERSHIP OF RESULTS...............................................................................................45
26.1 Ownership by the beneficiary that generates the results................................................................... 45
26.2 Joint ownership by several beneficiaries........................................................................................... 45
26.3 Rights of third parties (including personnel)..................................................................................... 45
26.4 EU ownership, to protect results........................................................................................................46
26.5 Consequences of non-compliance...................................................................................................... 47
ARTICLE 27 — PROTECTION OF RESULTS — VISIBILITY OF EU FUNDING................................... 47
27.1 Obligation to protect the results.........................................................................................................47
27.2 EU ownership, to protect the results..................................................................................................47
27.3 Information on EU funding................................................................................................................47
27.4 Consequences of non-compliance...................................................................................................... 47
ARTICLE 28 — EXPLOITATION OF RESULTS......................................................................................... 47
28.1 Obligation to exploit the results.........................................................................................................47
28.2 Results that could contribute to European or international standards — Information on EU
funding................................................................................................................................................. 48
28.3 Consequences of non-compliance...................................................................................................... 48
ARTICLE 29 — DISSEMINATION OF RESULTS — OPEN ACCESS — VISIBILITY OF EU
FUNDING...................................................................................................................................... 48
29.1 Obligation to disseminate results....................................................................................................... 48
29.2 Open access to scientific publications............................................................................................... 48
29.3 Open access to research data............................................................................................................. 49
7
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
29.4 Information on EU funding — Obligation and right to use the EU emblem.....................................49
29.5 Disclaimer excluding Commission responsibility..............................................................................50
29.6 Consequences of non-compliance...................................................................................................... 50
ARTICLE 30 — TRANSFER AND LICENSING OF RESULTS.................................................................. 50
30.1 Transfer of ownership........................................................................................................................ 50
30.2 Granting licenses................................................................................................................................ 50
30.3 Commission right to object to transfers or licensing.........................................................................51
30.4 Consequences of non-compliance...................................................................................................... 51
ARTICLE 31 — ACCESS RIGHTS TO RESULTS....................................................................................... 51
31.1 Exercise of access rights — Waiving of access rights — No sub-licensing......................................51
31.2 Access rights for other beneficiaries, for implementing their own tasks under the action.................51
31.3 Access rights for other beneficiaries, for exploiting their own results.............................................. 51
31.4 Access rights of affiliated entities......................................................................................................51
31.5 Access rights for the EU institutions, bodies, offices or agencies and EU Member States................51
31.6 Access rights for ............................................................................................................................... 52
31.7 Consequences of non-compliance...................................................................................................... 52
SECTION 4 OTHER RIGHTS AND OBLIGATIONS .......................................................................................52
ARTICLE 32 — RECRUITMENT AND WORKING CONDITIONS FOR RESEARCHERS..................... 52
32.1 Obligation to take measures to implement the European Charter for Researchers and Code of
Conduct for the Recruitment of Researchers......................................................................................52
32.2 Consequences of non-compliance...................................................................................................... 52
ARTICLE 33 — GENDER EQUALITY.........................................................................................................52
33.1 Obligation to aim for gender equality................................................................................................52
33.2 Consequences of non-compliance...................................................................................................... 52
ARTICLE 34 — ETHICS AND RESEARCH INTEGRITY.......................................................................... 53
34.1 Obligation to comply with ethical and research integrity principles................................................. 53
34.2 Activities raising ethical issues.......................................................................................................... 54
34.3 Activities involving human embryos or human embryonic stem cells..............................................54
34.4 Consequences of non-compliance...................................................................................................... 55
ARTICLE 35 — CONFLICT OF INTERESTS.............................................................................................. 55
35.1 Obligation to avoid a conflict of interests......................................................................................... 55
35.2 Consequences of non-compliance...................................................................................................... 55
ARTICLE 36 — CONFIDENTIALITY...........................................................................................................55
36.1 General obligation to maintain confidentiality.................................................................................. 55
36.2 Consequences of non-compliance...................................................................................................... 56
8
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
ARTICLE 37 — SECURITY-RELATED OBLIGATIONS............................................................................. 56
37.1 Results with a security recommendation........................................................................................... 56
37.2 Classified information........................................................................................................................ 56
37.3 Activities involving dual-use goods or dangerous materials and substances.....................................57
37.4 Consequences of non-compliance...................................................................................................... 57
ARTICLE 38 — PROMOTING THE ACTION — VISIBILITY OF EU FUNDING....................................57
38.1 Communication activities by beneficiaries........................................................................................ 57
38.2 Communication activities by the Commission.................................................................................. 58
38.3 Consequences of non-compliance...................................................................................................... 59
ARTICLE 39 — PROCESSING OF PERSONAL DATA.............................................................................. 59
39.1 Processing of personal data by the Commission............................................................................... 59
39.2 Processing of personal data by the beneficiaries............................................................................... 59
39.3 Consequences of non-compliance...................................................................................................... 59
ARTICLE 40 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE COMMISSION...........60
CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES — RELATIONSHIP
WITH COMPLEMENTARY BENEFICIARIES — RELATIONSHIP WITH PARTNERS OF A
JOINT ACTION .......................................................................................................................................60
ARTICLE 41 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES —
RELATIONSHIP WITH COMPLEMENTARY BENEFICIARIES — RELATIONSHIP WITH
PARTNERS OF A JOINT ACTION.............................................................................................60
41.1 Roles and responsibility towards the Commission............................................................................ 60
41.2 Internal division of roles and responsibilities.................................................................................... 60
41.3 Internal arrangements between beneficiaries — Consortium agreement...........................................61
41.4 Relationship with complementary beneficiaries — Collaboration agreement...................................62
41.5 Relationship with partners of a joint action — Coordination agreement.......................................... 62
CHAPTER 6 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY — SANCTIONS
— DAMAGES — SUSPENSION — TERMINATION — FORCE MAJEURE ............................... 62
SECTION 1 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY —
SANCTIONS .............................................................................................................................................62
ARTICLE 42 — REJECTION OF INELIGIBLE COSTS.............................................................................. 62
42.1 Conditions........................................................................................................................................... 62
42.2 Ineligible costs to be rejected — Calculation — Procedure..............................................................62
42.3 Effects................................................................................................................................................. 62
ARTICLE 43 — REDUCTION OF THE GRANT......................................................................................... 63
43.1 Conditions........................................................................................................................................... 63
43.2 Amount to be reduced — Calculation — Procedure.........................................................................63
43.3 Effects................................................................................................................................................. 63
9
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
ARTICLE 44 — RECOVERY OF UNDUE AMOUNTS............................................................................... 64
44.1 Amount to be recovered — Calculation — Procedure......................................................................64
ARTICLE 45 — ADMINISTRATIVE SANCTIONS..................................................................................... 68
SECTION 2 LIABILITY FOR DAMAGES ........................................................................................................ 68
ARTICLE 46 — LIABILITY FOR DAMAGES.............................................................................................68
46.1 Liability of the Commission.............................................................................................................. 68
46.2 Liability of the beneficiaries.............................................................................................................. 68
SECTION 3 SUSPENSION AND TERMINATION ............................................................................................68
ARTICLE 47 — SUSPENSION OF PAYMENT DEADLINE.......................................................................68
47.1 Conditions........................................................................................................................................... 68
47.2 Procedure............................................................................................................................................ 68
ARTICLE 48 — SUSPENSION OF PAYMENTS..........................................................................................69
48.1 Conditions........................................................................................................................................... 69
48.2 Procedure............................................................................................................................................ 69
ARTICLE 49 — SUSPENSION OF THE ACTION IMPLEMENTATION................................................... 70
49.1 Suspension of the action implementation, by the beneficiaries.........................................................70
49.2 Suspension of the action implementation, by the Commission......................................................... 70
ARTICLE 50 — TERMINATION OF THE AGREEMENT OR OF THE PARTICIPATION OF ONE OR
MORE BENEFICIARIES..............................................................................................................71
50.1 Termination of the Agreement, by the beneficiaries..........................................................................71
50.2 Termination of the participation of one or more beneficiaries, by the beneficiaries..........................72
50.3 Termination of the Agreement or of the participation of one or more beneficiaries, by the
Commission......................................................................................................................................... 74
SECTION 4 FORCE MAJEURE ..........................................................................................................................78
ARTICLE 51 — FORCE MAJEURE.............................................................................................................. 78
CHAPTER 7 FINAL PROVISIONS .......................................................................................................................... 79
ARTICLE 52 — COMMUNICATION BETWEEN THE PARTIES...............................................................79
52.1 Form and means of communication...................................................................................................79
52.2 Date of communication...................................................................................................................... 79
52.3 Addresses for communication............................................................................................................ 80
ARTICLE 53 — INTERPRETATION OF THE AGREEMENT.................................................................... 80
53.1 Precedence of the Terms and Conditions over the Annexes..............................................................80
53.2 Privileges and immunities.................................................................................................................. 80
ARTICLE 54 — CALCULATION OF PERIODS, DATES AND DEADLINES........................................... 80
ARTICLE 55 — AMENDMENTS TO THE AGREEMENT......................................................................... 80
55.1 Conditions........................................................................................................................................... 80
10
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
55.2 Procedure............................................................................................................................................ 81
ARTICLE 56 — ACCESSION TO THE AGREEMENT............................................................................... 81
56.1 Accession of the beneficiaries mentioned in the Preamble............................................................... 81
56.2 Addition of new beneficiaries............................................................................................................ 81
ARTICLE 57 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES.............................................. 82
57.1 Applicable law....................................................................................................................................82
57.2 Dispute settlement.............................................................................................................................. 82
ARTICLE 58 — ENTRY INTO FORCE OF THE AGREEMENT................................................................ 83
11
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
CHAPTER 1 GENERAL
ARTICLE 1 — SUBJECT OF THE AGREEMENT
This Agreement sets out the rights and obligations and the terms and conditions applicable to the grant
awarded to the beneficiaries for implementing the action set out in Chapter 2.
CHAPTER 2 ACTION
ARTICLE 2 — ACTION TO BE IMPLEMENTED
The grant is awarded for the action entitled ‘ERA-Net Cofund in Personalised Medicine — ERA
PerMed’ (‘action’), as described in Annex 1.
ARTICLE 3 — DURATION AND STARTING DATE OF THE ACTION
The duration of the action will be 60 months as of 1 December 2017 (‘starting date of the action’).
ARTICLE 4 — ESTIMATED BUDGET AND BUDGET TRANSFERS
4.1 Estimated budget
The ‘estimated budget’ for the action is set out in Annex 2.
It contains the estimated eligible costs and the forms of costs, broken down by beneficiary and budget
category (see Articles 5, 6). It also shows the estimated costs of the beneficiaries not receiving EU
funding (see Article 9).
4.2 Budget transfers
The estimated budget breakdown indicated in Annex 2 may be adjusted — without an amendment
(see Article 55) — by transfers of amounts between beneficiaries, budget categories and/or forms of
costs set out in Annex 2, if the action is implemented as described in Annex 1.
However, the beneficiaries may not add costs relating to subcontracts not provided for in Annex 1,
unless such additional subcontracts are approved by an amendment or in accordance with Article 13.
CHAPTER 3 GRANT
ARTICLE 5 — GRANT AMOUNT, FORM OF GRANT, REIMBURSEMENT RATES AND
FORMS OF COSTS
5.1 Maximum grant amount
The ‘maximum grant amount’ is EUR 9,508,950.00 (nine million five hundred and eight thousand
nine hundred and fifty EURO).
5.2 Form of grant, reimbursement rates and forms of costs
12
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
The grant reimburses 33% of the action's eligible costs (see Article 6) (‘reimbursement of eligible
costs grant’) (see Annex 2).
The estimated eligible costs of the action are EUR 28,815,000.00 (twenty eight million eight hundred
and fifteen thousand EURO).
Eligible costs (see Article 6) must be declared under the following forms ('forms of costs'):
(a) for costs of providing financial support to third parties implementing trans-national
projects: as actually incurred costs (‘actual costs’);
(b) for direct personnel costs for the implementation of trans-national projects by the
beneficiaries
- as actually incurred costs (actual costs) or
- on the basis of an amount per unit calculated by the beneficiary in accordance with its usual
cost accounting practices (‘unit costs’).
(c) for direct costs of subcontracting for the implementation of trans-national projects by the
beneficiaries: as actually incurred costs (actual costs);
(d) for other direct costs for the implementation of trans-national projects by the
beneficiaries: as actually incurred costs (actual costs);
(e) for direct coordination costs for additional activities: on the basis of the amount per unit set
out in Annex 2a (unit costs);
(f) for indirect costs: on the basis of a flat-rate applied as set out in Point C of Article 6.2 (‘flat-rate
costs’).
5.3 Final grant amount — Calculation
The ‘final grant amount’ depends on the actual extent to which the action is implemented in
accordance with the Agreement’s terms and conditions.
This amount is calculated by the Commission — when the payment of the balance is made (see
Article 21.4) — in the following steps:
Step 1 – Application of the reimbursement rates to the eligible costs
Step 2 – Limit to the maximum grant amount
Step 3 – Reduction due to the no-profit rule
Step 4 – Reduction due to substantial errors, irregularities or fraud or serious breach of obligations
5.3.1 Step 1 — Application of the reimbursement rates to the eligible costs
The reimbursement rate(s) (see Article 5.2) are applied to the eligible costs (actual costs, unit costs
and flat-rate costs; see Article 6) declared by the beneficiaries (see Article 20) and approved by the
Commission (see Article 21).
13
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
5.3.2 Step 2 — Limit to the maximum grant amount
If the amount obtained following Step 1 is higher than the maximum grant amount set out in
Article 5.1, it will be limited to the latter.
5.3.3 Step 3 — Reduction due to the no-profit rule
The grant must not produce a profit.
‘Profit’ means the surplus of the amount obtained following Steps 1 and 2 plus the action’s total
receipts, over the action’s total eligible costs.
The ‘action’s total eligible costs’ are the consolidated total eligible costs approved by the
Commission.
The ‘action’s total receipts’ are the consolidated total receipts generated during its duration (see
Article 3).
The following are considered receipts:
(a) income generated by the action; if the income is generated from selling equipment or other
assets purchased under the Agreement, the receipt is up to the amount declared as eligible under
the Agreement;
(b) financial contributions given by third parties to the beneficiary specifically to be used for the
action, and
(c) in-kind contributions provided by third parties free of charge and specifically to be used for the
action, if they have been declared as eligible costs.
The following are however not considered receipts:
(a) income generated by exploiting the action’s results (see Article 28);
(b) financial contributions by third parties, if they may be used to cover costs other than the eligible
costs (see Article 6);
(c) financial contributions by third parties with no obligation to repay any amount unused at the
end of the period set out in Article 3.
If there is a profit, it will be deducted from the amount obtained following Steps 1 and 2.
5.3.4 Step 4 — Reduction due to substantial errors, irregularities or fraud or serious breach of
obligations — Reduced grant amount — Calculation
If the grant is reduced (see Article 43), the Commission will calculate the reduced grant amount by
deducting the amount of the reduction (calculated in proportion to the improper implementation of the
action or to the seriousness of the errors, irregularities or fraud or breach of obligations, in accordance
with Article 43.2) from the maximum grant amount set out in Article 5.1.
The final grant amount will be the lower of the following two:
- the amount obtained following Steps 1 to 3 or
14
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
- the reduced grant amount following Step 4.
5.4 Revised final grant amount — Calculation
If — after the payment of the balance (in particular, after checks, reviews, audits or investigations;
see Article 22) — the Commission rejects costs (see Article 42) or reduces the grant (see Article 43),
it will calculate the ‘revised final grant amount’ for the beneficiary concerned by the findings.
This amount is calculated by the Commission on the basis of the findings, as follows:
- in case of rejection of costs: by applying the reimbursement rate to the revised eligible costs
approved by the Commission for the beneficiary concerned;
- in case of reduction of the grant: by calculating the concerned beneficiary’s share in the grant
amount reduced in proportion to its improper implementation of the action or to the seriousness
of the errors, irregularities or fraud or breach of obligations (see Article 43.2).
In case of rejection of costs and reduction of the grant, the revised final grant amount for the
beneficiary concerned will be the lower of the two amounts above.
ARTICLE 6 — ELIGIBLE AND INELIGIBLE COSTS
6.1 General conditions for costs to be eligible
‘Eligible costs’ are costs that meet the following criteria:
(a) for actual costs:
(i) they must be actually incurred by the beneficiary;
(ii) they must be incurred in the period set out in Article 3, with the exception of costs relating
to the submission of the final report (see Article 20);
(iii) they must be indicated in the estimated budget set out in Annex 2;
(iv) they must be incurred in connection with the action as described in Annex 1 and necessary
for its implementation;
(v) they must be identifiable and verifiable, in particular recorded in the beneficiary’s accounts
in accordance with the accounting standards applicable in the country where the beneficiary
is established and with the beneficiary’s usual cost accounting practices;
(vi) they must comply with the applicable national law on taxes, labour and social security, and
(vii) they must be reasonable, justified and must comply with the principle of sound financial
management, in particular regarding economy and efficiency.
(b) for unit costs:
(i) they must be calculated as follows:
{amounts per unit set out in Annex 2a or calculated by the beneficiary in accordance with its usual cost
accounting practices (see Article 6.2, PointA)
15
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
multiplied by
the number of actual units};
(ii) the number of actual units must comply with the following conditions:
- the units must be actually used or produced in the period set out in Article 3;
- the units must be necessary for implementing the action or produced by it, and
- the number of units must be identifiable and verifiable, in particular supported by records
and documentation (see Article 18).
(c) for flat-rate costs:
(i) they must be calculated by applying the flat-rate set out in Annex 2, and
(ii) the costs (actual costs or unit costs) to which the flat-rate is applied must comply with the
conditions for eligibility set out in this Article.
6.2 Specific conditions for costs to be eligible
Costs are eligible if they comply with the general conditions (see above) and the specific conditions
set out below for each of the following budget categories:
A. direct costs related to trans-national projects;
B. direct coordination costs for additional activities;
C. indirect costs.
‘Direct costs’ are costs that are directly linked to the action implementation and can therefore be
attributed to it directly. They must not include any indirect costs (see Point C below).
‘Indirect costs’ are costs that are not directly linked to the action implementation and therefore cannot
be attributed directly to it.
A. Direct costs related to trans-national projects
A.1 Direct costs of providing financial support to third parties implementing trans-national
projects are eligible if the conditions set out in Article 15.1.1 are met.
A.2 Direct costs for the implementation of trans-national projects by the beneficiaries are
eligible, if they comply with the conditions set out in Article 15.1.1 and the following:
A.2.1 Direct personnel costs for the implementation of trans-national projects by the
beneficiaries
Types of eligible personnel costs
A.2.1.1 Personnel costs are eligible, if they are related to personnel working for the beneficiary
under an employment contract (or equivalent appointing act) and assigned to the implementation
of trans-national projects (‘costs for employees (or equivalent)’). They must be limited to salaries
(including during parental leave), social security contributions, taxes and other costs included in the
16
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
remuneration, if they arise from national law or the employment contract (or equivalent appointing
act).
Beneficiaries that are non-profit legal entities1 may also declare as personnel costs additional
remuneration for personnel assigned to the implementation of trans-national projects (including
payments on the basis of supplementary contracts regardless of their nature), if:
(a) it is part of the beneficiary’s usual remuneration practices and is paid in a consistent manner
whenever the same kind of work or expertise is required;
(b) the criteria used to calculate the supplementary payments are objective and generally applied
by the beneficiary, regardless of the source of funding used.
Additional remuneration for personnel assigned to the implementation of trans-national projects is
eligible up to the following amount:
(a) if the person works full time and exclusively on the implementation of trans-national projects
during the full year: up to EUR 8 000;
(b) if the person works exclusively on the implementation of trans-national projects but not full-
time or not for the full year: up to the corresponding pro-rata amount of EUR 8 000, or
(c) if the person does not work exclusively on the implementation of trans-national projects: up to
a pro-rata amount calculated as follows:
{{EUR 8 000
divided by
the number of annual productive hours (see below)},
multiplied by
the number of hours that the person has worked on the trans-national projects during the year}.
A.2.1.2 The costs for natural persons working under a direct contract with the beneficiary other
than an employment contract are eligible personnel costs, if:
(a) the person works under the beneficiary’s instructions and, unless otherwise agreed with the
beneficiary, on the beneficiary’s premises;
(b) the result of the work carried out belongs to the beneficiary, and
(c) the costs are not significantly different from those for personnel performing similar tasks under
an employment contract with the beneficiary.
A.2.1.3 The costs of personnel seconded by a third party against payment are eligible personnel
costs if the conditions in Article 11.1 are met.
1 For the definition, see Article 2.1(14) of Regulation (EU) No 1290/2013 of the European Parliament and of the Council
of 11 December 2013 laying down the rules for the participation and dissemination in “Horizon 2020 – the Framework
Programme for Research and Innovation (2014-2020)” (‘Rules for Participation Regulation No 1290/2013’) (OJ L
347, 20.12.2013 p.81): ‘non-profit legal entity’ means a legal entity which by its legal form is non-profit-making or
which has a legal or statutory obligation not to distribute profits to its shareholders or individual members.
17
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
Calculation
Personnel costs must be calculated by the beneficiaries as follows:
{{hourly rate
multiplied by
number of actual hours worked on the implementation of trans-national projects},
plus
for non-profit legal entities: additional remuneration to personnel assigned to the implementation of trans-
national projects under the conditions set out above (Point A.2.1.1)}.
The number of actual hours declared for a person must be identifiable and verifiable (see Article 18).
The total number of hours declared in EU or Euratom grants, for a person for a year, cannot be higher
than the annual productive hours used for the calculations of the hourly rate. Therefore, the maximum
number of hours that can be declared for the grant are:
{the number of annual productive hours for the year (see below)
minus
total number of hours declared by the beneficiary for that person in that year for other EU or Euratom grants}.
The ‘hourly rate’ is one of the following:
(a) for personnel costs declared as actual costs: the hourly rate is calculated per full financial year
as follows:
{actual annual personnel costs (excluding additional remuneration) for the person
divided by
number of annual productive hours}.
Using the personnel costs and the number of productive hours for each full financial year covered
by the reporting period concerned. If a financial year is not closed at the end of the reporting
period, the beneficiaries must use the hourly rate of the last closed financial year available.
For the ‘number of annual productive hours’, the beneficiaries may choose one of the following:
(i) ‘fixed number of hours’: 1 720 hours for persons working full time (or corresponding
pro-rata for persons not working full time);
(ii) ‘individual annual productive hours’: the total number of hours worked by the person in the
year for the beneficiary, calculated as follows:
{annual workable hours of the person (according to the employment contract, applicable collective
labour agreement or national law)
plus
overtime worked
minus
absences (such as sick leave and special leave)}.
18
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
‘Annual workable hours’ means the period during which the personnel must be working,
at the employer’s disposal and carrying out his/her activity or duties under the employment
contract, applicable collective labour agreement or national working time legislation.
If the contract (or applicable collective labour agreement or national working time
legislation) does not allow to determine the annual workable hours, this option cannot be
used.
(iii) ‘standard annual productive hours’: the ‘standard number of annual hours’ generally applied
by the beneficiary for its personnel in accordance with its usual cost accounting practices.
This number must be at least 90% of the ‘standard annual workable hours’.
If there is no applicable reference for the standard annual workable hours, this option cannot
be used.
For all options, the actual time spent on parental leave by a person assigned to the implementation
of trans-national projects may be deducted from the number of annual productive hours.
As an alternative, beneficiaries may calculate the hourly rate per month, as follows:
{{actual monthly personnel cost (excluding additional remuneration) for the person
divided by
{number of annual productive hours / 12}}.
using the personnel costs for each month and (one twelfth of) the annual productive hours
calculated according to either option (i) or (iii) above, i.e.:
- fixed number of hours or
- standard annual productive hours.
Time spent on parental leave may not be deducted when calculating the hourly rate per month.
However, beneficiaries may declare personnel costs incurred in periods of parental leave in
proportion to the time the person worked on the action in that financial year.
If parts of a basic remuneration are generated over a period longer than a month, the beneficiaries
may include only the share which is generated in the month (irrespectively of the amount actually
paid for that month).
Each beneficiary must use only one option (per full financial year or per month) during each full
financial year;
(b) for personnel costs declared on the basis of unit costs calculated in accordance with the
beneficiary’s usual cost accounting practices: the hourly rate calculated by the beneficiary in
accordance with its usual cost accounting practices, if:
- the cost accounting practices used are applied in a consistent manner, based on objective
criteria, regardless of the source of funding;
- the hourly rate is calculated using the actual personnel costs recorded in the beneficiary’s
accounts, excluding any ineligible cost or costs included in other budget categories.
19
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
The actual personnel costs may be adjusted by the beneficiary on the basis of budgeted or
estimated elements. Those elements must be relevant for calculating the personnel costs,
reasonable and correspond to objective and verifiable information
and
- the hourly rate is calculated using the number of annual productive hours (see above).
A.2.2 Direct costs of subcontracting for the implementation of trans-national projects by the
beneficiaries (including related duties, taxes and charges such as non-deductible value added tax
(VAT) paid by the beneficiary) are eligible if the conditions in Article 13.1.1 are met.
A.2.3 Other direct costs for the implementation of trans-national projects by the beneficiaries
A.2.3.1 Travel costs and related subsistence allowances (including related duties, taxes and charges
such as non-deductible value added tax (VAT) paid by the beneficiary) are eligible if they are in line
with the beneficiary’s usual practices on travel.
A.2.3.2 The depreciation costs of equipment, infrastructure or other assets (new or second-
hand) as recorded in the beneficiary’s accounts are eligible, if they were purchased in accordance
with Article 10.1.1 and written off in accordance with international accounting standards and the
beneficiary’s usual accounting practices.
The costs of renting or leasing equipment, infrastructure or other assets (including related duties,
taxes and charges such as non-deductible value added tax (VAT) paid by the beneficiary) are also
eligible, if they do not exceed the depreciation costs of similar equipment, infrastructure or assets and
do not include any financing fees.
The costs of equipment, infrastructure or other assets contributed in-kind against payment are
eligible, if they do not exceed the depreciation costs of similar equipment, infrastructure or assets, do
not include any financing fees and if the conditions in Article 11.1 are met.
The only portion of the costs that will be taken into account is that which corresponds to the duration
of the trans-national projects implemented by the beneficiary and rate of actual use for the purposes
of the transnational projects implemented by the beneficiary.
A.2.3.3 Costs of other goods and services (including related duties, taxes and charges such as non-
deductible value added tax (VAT) paid by the beneficiary) are eligible, if they are:
(a) purchased specifically for the trans-national projects implemented by the beneficiary and in
accordance with Article 10.1.1 or
(b) contributed in kind against payment and in accordance with Article 11.1.
Such goods and services include, for instance, consumables and supplies, dissemination (including
open access), protection of results, certificates on the financial statements (if they are required by the
Agreement), certificates on the methodology, translations and publications.
20
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
A.2.3.4 Capitalised and operating costs of ‘large research infrastructure’2 directly used for the
trans-national projects implemented by the beneficiary are eligible, if:
(a) the value of the large research infrastructure represents at least 75% of the total fixed assets (at
historical value in its last closed balance sheet before the date of the signature of the Agreement
or as determined on the basis of the rental and leasing costs of the research infrastructure3);
(b) the beneficiary’s methodology for declaring the costs for large research infrastructure has been
positively assessed by the Commission (‘ex-ante assessment’);
(c) the beneficiary declares as direct eligible costs only the portion which corresponds to the
duration of the trans-national projects implemented by the beneficiary and the rate of actual
use for the purposes of the trans-national projects implemented by the beneficiary, and
(d) they comply with the conditions as further detailed in the annotations to the H2020 Grant
Agreements.
B. Direct coordination costs for additional activities
Direct coordination costs for additional activities are eligible, if they correspond to the amount per
unit set out in Annex 2a multiplied by the number of actual years in which the beneficiary has carried
out the ‘additional activities’ described in Annex 1.
Beneficiaries that implement transnational projects (partially or fully) themselves cannot declare
direct coordination costs for additional activities.
C. Indirect costs
Indirect costs are eligible if they are declared on the basis of the flat-rate of 25% of the eligible direct
costs (see Article 5.2 and Points A and B above), from which are excluded:
(a) costs of subcontracting for the implementation of trans-national projects by the beneficiaries;
(b) costs of in-kind contributions provided by third parties which are not used on the beneficiary’s
premises and
(c) costs of financial support to third parties implementing trans-national projects.
Beneficiaries receiving an operating grant4 financed by the EU or Euratom budget cannot declare
indirect costs for the period covered by the operating grant.
2 ‘Large research infrastructure’ means research infrastructure of a total value of at least EUR 20 million, for a
beneficiary, calculated as the sum of historical asset values of each individual research infrastructure of that beneficiary,
as they appear in its last closed balance sheet before the date of the signature of the Agreement or as determined on the
basis of the rental and leasing costs of the research infrastructure.
3 For the definition see Article 2(6) of the H2020 Framework Programme Regulation No 1291/2013: ‘Research
infrastructure’ are facilities, resources and services that are used by the research communities to conduct research and
foster innovation in their fields. Where relevant, they may be used beyond research, e.g. for education or public services.
They include: major scientific equipment (or sets of instruments); knowledge-based resources such as collections,
archives or scientific data; e-infrastructures such as data and computing systems and communication networks; and any
other infrastructure of a unique nature essential to achieve excellence in research and innovation. Such infrastructures
may be ‘single-sited’, ‘virtual’ or ‘distributed’.
4 For the definition, see Article 121(1)(b) of Regulation (EU, Euratom) No 966/2012 of the European Parliament and
of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union and repealing
21
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
6.3 Conditions for costs of linked third parties to be eligible
Not applicable
6.4 Conditions for in-kind contributions provided by third parties free of charge to be eligible
In-kind contributions provided free of charge are eligible direct costs (for the beneficiary), if the
costs incurred by the third party fulfil — mutatis mutandis — the general and specific conditions for
eligibility set out in this Article (Article 6.1 and 6.2) and Article 12.1.
6.5 Ineligible costs
‘Ineligible costs’ are:
(a) costs that do not comply with the conditions set out above (Article 6.1 to 6.4), in particular:
(i) costs related to return on capital;
(ii) debt and debt service charges;
(iii) provisions for future losses or debts;
(iv) interest owed;
(v) doubtful debts;
(vi) currency exchange losses;
(vii) bank costs charged by the beneficiary’s bank for transfers from the Commission;
(viii) excessive or reckless expenditure;
(ix) deductible VAT;
(x) costs incurred during suspension of the implementation of the action (see Article 49);
(b) costs reimbursed under another EU or Euratom grant (including grants awarded by a Member
State and financed by the EU or Euratom budget and grants awarded by bodies other than the
Commission for the purpose of implementing the EU or Euratom budget); in particular, indirect
costs if the beneficiary is already receiving an operating grant financed by the EU or Euratom
budget in the same period.
6.6 Consequences of declaration of ineligible costs
Declared costs that are ineligible will be rejected (see Article 42).
This may also lead to any of the other measures described in Chapter 6.
Council Regulation (EC, Euratom) No 1605/2002 (‘Financial Regulation No 966/2012’) (OJ L 218, 26.10.2012, p.1):
‘operating grant’ means direct financial contribution, by way of donation, from the budget in order to finance the
functioning of a body which pursues an aim of general EU interest or has an objective forming part of and supporting
an EU policy.
22
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
CHAPTER 4 RIGHTS AND OBLIGATIONS OF THE PARTIES
SECTION 1 RIGHTS AND OBLIGATIONS RELATED TO IMPLEMENTING THE
ACTION
ARTICLE 7 — GENERAL OBLIGATION TO PROPERLY IMPLEMENT THE ACTION
7.1 General obligation to properly implement the action
The beneficiaries must implement the action as described in Annex 1 and in compliance with the
provisions of the Agreement and all legal obligations under applicable EU, international and national
law.
7.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 8 — RESOURCES TO IMPLEMENT THE ACTION — THIRD PARTIES
INVOLVED IN THE ACTION
The beneficiaries must have the appropriate resources to implement the action.
If it is necessary for the implementation of the trans-national projects by the beneficiaries, they may:
- purchase goods, works and services (see Article 10);
- use in-kind contributions provided by third parties against payment (see Article 11);
- use in-kind contributions provided by third parties free of charge (see Article 12);
- call upon subcontractors to implement action tasks described in Annex 1 (see Article 13);
- call upon linked third parties to implement action tasks described in Annex 1 (see Article 14).
In these cases, the beneficiaries retain sole responsibility towards the Commission and the other
beneficiaries for implementing the action.
ARTICLE 9 — IMPLEMENTATION OF ACTION TASKS BY BENEFICIARIES NOT
RECEIVING EU FUNDING
9.1 Rules for the implementation of action tasks by beneficiaries not receiving EU funding
Beneficiaries not receiving EU funding must implement the action tasks attributed to them in Annex 1
according to Article 7.1.
Their costs are estimated in Annex 2 but:
- will not be reimbursed and
23
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
- will not be taken into account for the calculation of the grant (see Articles 5.2, 5.3 and 5.4,
and 21).
Chapter 3, Articles 10 to 15, 18.1.2, 20.2a(f), 20.4(b), 20.6, 21, 23a, 26.4, 27.2, 28.1, 28.2, 30.3, 31.5,
40, 42, 43, 44, 47 and 48 do not apply to these beneficiaries.
They will not be subject to financial checks, reviews and audits under Article 22.
Beneficiaries not receiving EU funding may provide in-kind contributions to another beneficiary. In
this case, they will be considered as a third party for the purpose of Articles 11 and 12.
9.2 Consequences of non-compliance
If a beneficiary not receiving EU funding breaches any of its obligations under this Article, its
participation in the Agreement may be terminated (see Article 50).
Such breaches may also lead to any of the other measures described in Chapter 6 that are applicable
to it.
ARTICLE 10 — PURCHASE OF GOODS, WORKS OR SERVICES
10.1 Rules for purchasing goods, works or services
10.1.1 If necessary for the implementation of trans-national projects by the beneficiaries, they may
purchase goods, works or services.
The beneficiaries must make such purchases ensuring the best value for money or, if appropriate, the
lowest price. In doing so, they must avoid any conflict of interests (see Article 35).
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the
European Anti-Fraud Office (OLAF) can exercise their rights under Articles 22 and 23 also towards
their contractors.
10.1.2 Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC5 (or
2014/24/EC6) or ‘contracting entities’ within the meaning of Directive 2004/17/EC7 (or 2014/25/EC8)
must comply with the applicable national law on public procurement.
10.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under Article 10.1.1, the costs related to the contract
concerned will be ineligible (see Article 6) and will be rejected (see Article 42).
5 Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of
procedures for the award of public work contracts, public supply contracts and public service contracts (OJ L 134,
30.04.2004, p. 114).
6 Directive 2014/24/EU of the European Parliament and of the Council of 26 February 2014 on public procurement and
repealing Directive 2004/18/EC. (OJ L 94, 28.03.2014, p. 65).
7 Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the procurement
procedures of entities operating in the water, energy, transport and postal services sectors (OJ L 134, 30.04.2004, p. 1)
8 Directive 2014/25/EU of the European Parliament and of the Council of 26 February 2014 on procurement by entities
operating in the water, energy, transport and postal services sectors and repealing Directive 2004/17/EC (OJ L 94,
28.03.2014, p. 243).
24
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
If a beneficiary breaches any of its obligations under Article 10.1.2, the grant may be reduced (see
Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 11 — USE OF IN-KIND CONTRIBUTIONS PROVIDED BY THIRD PARTIES
AGAINST PAYMENT
11.1 Rules for the use of in-kind contributions against payment
If necessary for the implementation of trans-national projects by the beneficiaries, they may use in-
kind contributions provided by third parties against payment.
The beneficiaries may declare costs related to the payment of in-kind contributions as eligible (see
Article 6.1 and 6.2), up to the third parties’ costs for the seconded persons, contributed equipment,
infrastructure or other assets or other contributed goods and services.
The third parties and their contributions must be set out in Annex 1. The Commission may however
approve in-kind contributions not set out in Annex 1 without amendment (see Article 55), if:
- they are specifically justified in the final technical report and
- their use does not entail changes to the Agreement which would call into question the decision
awarding the grant or breach the principle of equal treatment of applicants.
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the
European Anti-Fraud Office (OLAF) can exercise their rights under Articles 22 and 23 also towards
the third parties.
11.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the costs related to the payment of
the in-kind contribution will be ineligible (see Article 6) and will be rejected (see Article 42).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 12 — USE OF IN-KIND CONTRIBUTIONS PROVIDED BY THIRD PARTIES
FREE OF CHARGE
12.1 Rules for the use of in-kind contributions free of charge
If necessary for the implementation of trans-national projects by the beneficiaries, they may use in-
kind contributions provided by third parties free of charge.
The beneficiaries may declare costs incurred by the third parties for the seconded persons, contributed
equipment, infrastructure or other assets or other contributed goods and services as eligible in
accordance with Article 6.4.
The third parties and their contributions must be set out in Annex 1. The Commission may however
approve in-kind contributions not set out in Annex 1 without amendment (see Article 55), if:
- they are specifically justified in the final technical report and
25
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
- their use does not entail changes to the Agreement which would call into question the decision
awarding the grant or breach the principle of equal treatment of applicants.
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the
European Anti-Fraud Office (OLAF) can exercise their rights under Articles 22 and 23 also towards
the third parties.
12.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the costs incurred by the third parties
related to the in-kind contribution will be ineligible (see Article 6) and will be rejected (see Article 42).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 13 — IMPLEMENTATION OF ACTION TASKS BY SUBCONTRACTORS
13.1 Rules for subcontracting action tasks
13.1.1 If necessary for the implementation of trans-national projects by the beneficiaries, they may
award subcontracts covering the implementation of certain action tasks described in Annex 1.
Subcontracting may cover only a limited part of the trans-national projects.
The beneficiaries must award the subcontracts ensuring the best value for money or, if appropriate,
the lowest price. In doing so, they must avoid any conflict of interests (see Article 35).
The tasks to be implemented and the estimated cost for each subcontract must be set out in Annex 1 and
the total estimated costs of subcontracting per beneficiary must be set out in Annex 2. The Commission
may however approve subcontracts not set out in Annex 1 and 2 without amendment (see Article
55), if:
- they are specifically justified in the final technical report and
- they do not entail changes to the Agreement which would call into question the decision
awarding the grant or breach the principle of equal treatment of applicants.
The beneficiaries must ensure that the Commission, the European Court of Auditors (ECA) and the
European Anti-Fraud Office (OLAF) can exercise their rights under Articles 22 and 23 also towards
their subcontractors.
13.1.2 The beneficiaries must ensure that their obligations under Articles 35, 36, 38 and 46 also apply
to the subcontractors.
Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC (or
2014/24/EU) or ‘contracting entities’ within the meaning of Directive 2004/17/EC (or 2014/25/EU)
must comply with the applicable national law on public procurement.
13.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under Article 13.1.1, the costs related to the subcontract
concerned will be ineligible (see Article 6) and will be rejected (see Article 42).
26
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
If a beneficiary breaches any of its obligations under Article 13.1.2, the grant may be reduced (see
Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 14 — IMPLEMENTATION OF ACTION TASKS BY LINKED THIRD PARTIES
Not applicable
ARTICLE 15 — SUPPORT TO OR IMPLEMENTATION OF TRANS-NATIONAL
PROJECTS
15.1 Rules for providing support to or implementation of trans-national projects
15.1.1 The beneficiaries must provide financial support to trans-national projects or implement such
projects (partially or fully) themselves, in accordance with the following conditions:
(a) types of activity that qualify for financial support and persons or categories of persons that may
receive financial support:
The projects must be trans-national projects, involving at least two independent entities from
two different EU Member States or associated countries;
(b) selection procedure and criteria:
The projects must be selected following a single joint transnational call for proposals.
The beneficiaries must make the selection through a two-step procedure:
- Step 1: review at national or trans-national level
- Step 2: single international peer review.
Only entities that are eligible for funding under the national programmes involved in the joint
call may be invited to Step 2.
In Step 2, the beneficiaries must evaluate proposals with the assistance of at least three
independent experts, on the basis of the following award criteria:
(a) excellence;
(b) impact;
(c) quality and efficiency of the implementation.
Proposals must be ranked according to the evaluation results. The selection must be made on
the basis of this ranking.
The selection procedure must be followed by an independent expert observer, who must make
a report (see Article 20.2a);
(c) other conditions:
27
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
In the case of support to entities that are third parties, the beneficiaries must ensure that the
Commission, the European Court of Auditors (ECA) and the European Anti-fraud Office
(OLAF) can exercise their rights under Article 22 and 23 also towards the third parties receiving
financial support.
Financial support to entities that are third parties must comply with national funding rules.
The maximum amount of financial support to a third party and the criteria for determining the
exact amount under national funding rules are set out in Annex 1.
15.1.2 In addition, the beneficiaries must:
- publish a joint call on a dedicated webpage and promote it at national/regional level via their
usual channels of communications to potential proposers;
- keep the joint call open for at least 60 days;
- take all lawful steps to ensure confidentiality of information and documents obtained during
the evaluation and selection procedures of the joint call.
15.2 Consequences of non-compliance
If a beneficiary breaches its obligations under Article 15.1.1, the costs of the beneficiary for its
financial support to the trans-national projects or for the implementation of its trans-national projects
will be ineligible (see Article 6) and will be rejected (see Article 42).
If the beneficiary breaches its obligations under Article 15.1.2, the grant may be reduced (see
Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 16 — PROVISION OF TRANS-NATIONAL OR VIRTUAL ACCESS TO
RESEARCH INFRASTRUCTURE
Not applicable
SECTION 2 RIGHTS AND OBLIGATIONS RELATED TO THE GRANT
ADMINISTRATION
ARTICLE 17 — GENERAL OBLIGATION TO INFORM
17.1 General obligation to provide information upon request
The beneficiaries must provide — during implementation of the action or afterwards and in accordance
with Article 41.2 — any information requested in order to verify eligibility of the costs, proper
implementation of the action and compliance with any other obligation under the Agreement.
17.2 Obligation to keep information up to date and to inform about events and circumstances
likely to affect the Agreement
28
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
Each beneficiary must keep information stored in the Participant Portal Beneficiary Register (via
the electronic exchange system; see Article 52) up to date, in particular, its name, address, legal
representatives, legal form and organisation type.
Each beneficiary must immediately inform the coordinator — which must immediately inform the
Commission and the other beneficiaries — of any of the following:
(a) events which are likely to affect significantly or delay the implementation of the action or the
EU's financial interests, in particular:
(i) changes in its legal, financial, technical, organisational or ownership situation
(b) circumstances affecting:
(i) the decision to award the grant or
(ii) compliance with requirements under the Agreement.
17.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 18 — KEEPING RECORDS — SUPPORTING DOCUMENTATION
18.1 Obligation to keep records and other supporting documentation
The beneficiaries must — for a period of five years after the payment of the balance — keep records
and other supporting documentation in order to prove the proper implementation of the action and
the costs they declare as eligible.
They must make them available upon request (see Article 17) or in the context of checks, reviews,
audits or investigations (see Article 22).
If there are on-going checks, reviews, audits, investigations, litigation or other pursuits of claims under
the Agreement (including the extension of findings; see Article 22), the beneficiaries must keep the
records and other supporting documentation until the end of these procedures.
The beneficiaries must keep the original documents. Digital and digitalised documents are considered
originals if they are authorised by the applicable national law. The Commission may accept non-
original documents if it considers that they offer a comparable level of assurance.
18.1.1 Records and other supporting documentation on the scientific and technical
implementation
The beneficiaries must keep records and other supporting documentation on scientific and technical
implementation of the action in line with the accepted standards in the respective field.
18.1.2 Records and other documentation to support the costs declared
29
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
The beneficiaries must keep the records and documentation supporting the costs declared, in particular
the following:
(a) for actual costs: adequate records and other supporting documentation to prove the costs
declared, such as contracts, subcontracts, invoices and accounting records. In addition, the
beneficiaries' usual cost accounting practices and internal control procedures must enable direct
reconciliation between the amounts declared, the amounts recorded in their accounts and the
amounts stated in the supporting documentation;
(b) for unit costs: adequate records and other supporting documentation to prove the number of
units declared. Beneficiaries do not need to identify the actual eligible costs covered or to keep
or provide supporting documentation (such as accounting statements) to prove the amount per
unit.
In addition, for direct personnel costs declared as unit costs calculated in accordance
with the beneficiary's usual cost accounting practices, the beneficiaries must keep adequate
records and documentation to prove that the cost accounting practices used comply with the
conditions set out in Article 6.2, Point A.
The beneficiaries may submit to the Commission, for approval, a certificate (drawn up in
accordance with Annex 6) stating that their usual cost accounting practices comply with these
conditions (‘certificate on the methodology’). If the certificate is approved, costs declared in
line with this methodology will not be challenged subsequently, unless the beneficiaries have
concealed information for the purpose of the approval.
(c) for flat-rate costs: adequate records and other supporting documentation to prove the eligibility
of the costs to which the flat-rate is applied. The beneficiaries do not need to identify the costs
covered or provide supporting documentation (such as accounting statements) to prove the
amount declared at a flat-rate.
In addition, for personnel costs (declared as actual costs or on the basis of unit costs), the beneficiaries
must keep time records for the number of hours declared. The time records must be in writing and
approved by the persons working on the action and their supervisors, at least monthly. In the absence
of reliable time records of the hours worked on the action, the Commission may accept alternative
evidence supporting the number of hours declared, if it considers that it offers an adequate level of
assurance.
As an exception, for persons working exclusively on the action, there is no need to keep time records,
if the beneficiary signs a declaration confirming that the persons concerned have worked exclusively
on the action.
18.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, costs insufficiently substantiated
will be ineligible (see Article 6) and will be rejected (see Article 42), and the grant may be reduced
(see Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 19 — SUBMISSION OF DELIVERABLES
30
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
19.1 Obligation to submit deliverables
The coordinator must submit:
- at least 30 days before the expected date of publication of the joint call: information on the
call and its content;
- at the end of the selection: information on each selected project (including data on each
participant and abstracts of the project proposal, in a format specified by the Commission), for
publication and evaluation purposes;
- in month 36 a ‘progress report’ containing:
- an explanation of the work carried out by the beneficiaries;
- an overview of the progress towards the objectives of the action, including milestones
and other deliverables identified in Annex 1.
This report must include explanations justifying the differences between work expected
to be carried out in accordance with Annex 1 and that actually carried out;
- a summary for publication by the Commission;
- at the end of the action: information on each implemented project (including data on
each participant and overview of the results, in a format specified by the Commission), for
publication and evaluation purposes, and
- any other deliverables identified in Annex 1, in accordance with the timing and conditions
set out in it.
19.2 Consequences of non-compliance
If the coordinator breaches any of its obligations under this Article, the Commission may apply any
of the measures described in Chapter 6.
ARTICLE 20 — REPORTING — PAYMENT REQUESTS
20.1 Obligation to submit reports
The coordinator must submit to the Commission (see Article 52) the reports set out in this Article.
These reports include the requests for payments and must be drawn up using the forms and templates
provided in the electronic exchange system (see Article 52).
20.2 Reporting periods
The action is divided into the following ‘reporting periods’:
- RP1: from month 1 to month 12
- RP2: from month 13 to month 60
20.2a Periodic reports — Requests for second pre-financing payment
31
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
The coordinator must submit a periodic report within 60 days following the end of the first reporting
period.
The periodic report must include the following:
(a) a periodic technical report containing:
(i) an explanation of the work carried out by the beneficiaries;
(ii) an overview of the progress towards the objectives of the action, including milestones
and other deliverables identified in Annex 1.
This report must include explanations justifying the differences between work expected
to be carried out in accordance with Annex 1 and that actually carried out.
The report must detail the exploitation and dissemination of the results and — if required
in Annex 1 — an updated ‘plan for the exploitation and dissemination of the results’;
The report must indicate the communication activities;
(iii) a summary for publication by the Commission;
(iv) the answers to the ‘questionnaire’ covering issues related to the action implementation
and the economic and societal impact, notably in the context of the Horizon 2020 key
performance indicators and the Horizon 2020 monitoring requirements.
(b) the ranking list(s) of the projects;
(c) the observers’ report on the evaluation;
(d) the joint selection list of the projects to be funded;
(e) from each beneficiary participating in the joint call, a formal and duly signed ‘commitment
on availability of funds’ (see Annex 7), and
(f) a ‘statement on the use of the first pre-financing payment’ (see Annex 8), including the
request for a second pre-financing payment.
The coordinator must certify that the information provided is full, reliable and true and that it can
be substantiated by adequate supporting documentation that will be produced upon request or in the
context of checks, reviews, audits and investigations (see Articles 17, 18 and 22).
20.3 Request for interim payments
Not applicable
20.4 Final report — Request for payment of the balance
The coordinator must submit the final report within 60 days following the end of the last reporting
period.
The final report must include the following:
32
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
(a) a ‘final technical report’ with a summary for publication containing:
(i) an overview of the results and their exploitation and dissemination;
(ii) the conclusions on the action, and
(iii) the socio-economic impact of the action;
(b) a ‘final financial report’ containing:
(i) an ‘individual financial statement’ (see Annex 4), from each beneficiary, for all
reporting periods.
The individual financial statement must detail the eligible costs (actual costs, unit costs
and flat-rate costs; see Article 6) for each budget category (see Annex 2).
The beneficiaries must declare all eligible costs, even if — for actual costs, unit costs
and flat-rate costs — they exceed the amounts indicated in the estimated budget (see
Annex 2). Amounts which are not declared in the individual financial statement will not
be taken into account by the Commission.
The individual financial statements must also detail the receipts of the action (see
Article 5.3.3).
Each beneficiary must certify that:
- the information provided is full, reliable and true;
- the costs declared are eligible (in particular, in case of financial support to third
parties, that it has been paid in compliance with the applicable national funding
rules; see Article 15);
- the costs can be substantiated by adequate records and supporting documentation
(see Article 18) that will be produced upon request (see Article 17) or in the context
of checks, reviews, audits and investigations (see Article 22), and
- all the receipts have been declared (see Article 5.3.3);
(ii) an explanation of the use of resources and the information on subcontracting (see
Article 13) and in-kind contributions provided by third parties (see Articles 11 and 12)
from each beneficiary;
(iii) not applicable;
(iv) a ‘summary financial statement’, created automatically by the electronic exchange
system, consolidating the individual financial statements and including the request for
payment of the balance;
(v) a ‘certificate on the financial statements’ (drawn up in accordance with Annex 5)
for each beneficiary, if it requests a total contribution of EUR 325 000 or more, as
reimbursement of actual costs and unit costs calculated on the basis of its usual cost
accounting practices (see Article 5.2 and Point A.2.1 of Article 6.2).
33
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
20.5 Information on cumulative expenditure incurred
In addition to the reporting requirements set out above (Article 20.1 to 20.3), the coordinator must
inform the Commission by 31 December each year of the cumulative expenditure incurred by the
beneficiaries from the starting date of the action.
This information is required for the Commission’s accounting purposes and will not be used to
calculate the final grant amount.
20.6 Currency for financial statements and conversion into euro
Financial statements must be drafted in euro.
Beneficiaries with accounting established in a currency other than the euro must convert the costs
recorded in their accounts into euro, at the average of the daily exchange rates published in the C series
of the Official Journal of the European Union, calculated over the corresponding reporting period.
If no daily euro exchange rate is published in the Official Journal of the European Union for the
currency in question, they must be converted at the average of the monthly accounting rates published
on the Commission’s website, calculated over the corresponding reporting period.
Beneficiaries with accounting established in euro must convert costs incurred in another currency into
euro according to their usual accounting practices.
20.7 Language of reports
All reports (technical and financial reports, including financial statements) must be submitted in the
language of the Agreement.
20.8 Consequences of non-compliance
If the reports submitted do not comply with this Article, the Commission may suspend the payment
deadline (see Article 47) and apply any of the other measures described in Chapter 6.
If the coordinator breaches its obligation to submit the reports and if it fails to comply with this
obligation within 30 days following a written reminder, the Commission may terminate the Agreement
(see Article 50) or apply any of the other measures described in Chapter 6.
ARTICLE 21 — PAYMENTS AND PAYMENT ARRANGEMENTS
21.1 Payments to be made
The following payments will be made to the coordinator:
- a first pre-financing payment;
- a second pre-financing payment, on the basis of the request for a second pre-financing payment
(see Article 20);
- one payment of the balance, on the basis of the request for payment of the balance (see
Article 20).
34
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
21.2 Pre-financing payment — Amount — Amount retained for the Guarantee Fund
The aim of the pre-financing is to provide the beneficiaries with a float.
It remains the property of the EU until the payment of the balance.
The Commission will — within 30 days, either from the entry into force of the Agreement (see Article
58) or from 10 days before the starting date of the action (see Article 3), whichever is the latest —
make a first pre-financing payment to the coordinator of EUR 950,895.00 (nine hundred and fifty
thousand eight hundred and ninety five EURO), except if Article 48 applies.
From this amount, an amount of EUR 475,447.50 (four hundred and seventy five thousand four
hundred and forty seven EURO and fifty eurocents), corresponding to the 5% of the maximum grant
amount (see Article 5.1), is retained by the Commission and transferred into the ‘Guarantee Fund’.
The Commission will — within 60 days after receiving the request (see Article 20) — make a second
pre-financing payment to the coordinator of EUR 7,607,160.00 (seven million six hundred and seven
thousand one hundred and sixty EURO), except if Article 47 or 48 apply.
If the statement on the use of the previous pre-financing payment shows that less than 70 % of the
previous payment has been used to cover the costs of the action, the amount of the new pre-financing
to be paid will be reduced by the difference between the 70 % threshold and the amount used.
21.3 Interim payments — Amount — Calculation
Not applicable
21.4 Payment of the balance — Amount — Calculation — Release of the amount retained for
the Guarantee Fund
The payment of the balance reimburses the remaining part of the eligible costs incurred by the
beneficiaries for the implementation of the action.
If the total amount of earlier payments is greater than the final grant amount (see Article 5.3), the
payment of the balance takes the form of a recovery (see Article 44).
If the total amount of earlier payments is lower than the final grant amount, the Commission will
pay the balance within 90 days from receiving the final report (see Article 20.4), except if Articles
47 or 48 apply.
Payment is subject to the approval of the final report. Its approval does not imply recognition of the
compliance, authenticity, completeness or correctness of its content.
The amount due as the balance is calculated by the Commission by deducting the total amount of
pre-financing already made, from the final grant amount determined in accordance with Article 5.3:
{final grant amount (see Article 5.3)
minus
pre-financing made}.
At the payment of the balance, the amount retained for the Guarantee Fund (see above) will be released
and:
35
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
- if the balance is positive: the amount released will be paid in full to the coordinator together
with the amount due as the balance;
- if the balance is negative (payment of the balance taking the form of recovery): it will be
deducted from the amount released (see Article 44.1.2). If the resulting amount:
- is positive, it will be paid to the coordinator
- is negative, it will be recovered.
The amount to be paid may however be offset — without the beneficiaries’ consent — against any
other amount owed by a beneficiary to the Commission or an executive agency (under the EU or
Euratom budget), up to the maximum EU contribution indicated, for that beneficiary, in the estimated
budget (see Annex 2).
21.5 Notification of amounts due
When making payments, the Commission will formally notify to the coordinator the amount due,
specifying whether it concerns the second pre-financing payment or the payment of the balance.
For the payment of the balance, the notification will also specify the final grant amount.
In the case of reduction of the grant or recovery of undue amounts, the notification will be preceded
by the contradictory procedure set out in Articles 43 and 45.
21.6 Currency for payments
The Commission will make all payments in euro.
21.7 Payments to the coordinator — Distribution to the beneficiaries
Payments will be made to the coordinator.
Payments to the coordinator will discharge the Commission from its payment obligation.
The coordinator must distribute the payments between the beneficiaries without unjustified delay.
Pre-financing may however be distributed only:
(a) if the minimum number of beneficiaries set out in the call for proposals has acceded to the
Agreement (see Article 56) and
(b) to beneficiaries that have acceded to the Agreement (see Article 56).
21.8 Bank account for payments
All payments will be made to the following bank account:
Name of bank: BANCO SANTANDER, S.A.
Full name of the account holder: FUNDACION ESPANOLA PARA LA COOPERACION
INTERNACIONAL SALUD Y POLITICA
Full account number (including bank codes): ()
IBAN code: ES1400493706912114055347
36
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
21.9 Costs of payment transfers
The cost of the payment transfers is borne as follows:
- the Commission bears the cost of transfers charged by its bank;
- the beneficiary bears the cost of transfers charged by its bank;
- the party causing a repetition of a transfer bears all costs of the repeated transfer.
21.10 Date of payment
Payments by the Commission are considered to have been carried out on the date when they are
debited to its account.
21.11 Consequences of non-compliance
21.11.1 If the Commission does not pay within the payment deadlines (see above), the beneficiaries
are entitled to late-payment interest at the rate applied by the European Central Bank (ECB) for its
main refinancing operations in euros (‘reference rate’), plus three and a half points. The reference rate
is the rate in force on the first day of the month in which the payment deadline expires, as published
in the C series of the Official Journal of the European Union.
If the late-payment interest is lower than or equal to EUR 200, it will be paid to the coordinator only
upon request submitted within two months of receiving the late payment.
Late-payment interest is not due if all beneficiaries are EU Member States (including regional and
local government authorities or other public bodies acting on behalf of a Member State for the purpose
of this Agreement).
Suspension of the payment deadline or payments (see Articles 47 and 48) will not be considered as
late payment.
Late-payment interest covers the period running from the day following the due date for payment (see
above), up to and including the date of payment.
Late-payment interest is not considered for the purposes of calculating the final grant amount.
21.11.2 If the coordinator breaches any of its obligations under this Article, the grant may be reduced
(see Article 43) and the Agreement or the participation of the coordinator may be terminated (see
Article 50).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 22 — CHECKS, REVIEWS, AUDITS AND INVESTIGATIONS — EXTENSION
OF FINDINGS
22.1 Checks, reviews and audits by the Commission
22.1.1 Right to carry out checks
The Commission will — during the implementation of the action or afterwards — check the proper
37
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
implementation of the action and compliance with the obligations under the Agreement, including
assessing deliverables and reports.
For this purpose the Commission may be assisted by external persons or bodies.
The Commission may also request additional information in accordance with Article 17. The
Commission may request beneficiaries to provide such information to it directly.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
22.1.2 Right to carry out reviews
The Commission may — during the implementation of the action or afterwards — carry out reviews
on the proper implementation of the action (including assessment of deliverables and reports),
compliance with the obligations under the Agreement and continued scientific or technological
relevance of the action.
Reviews may be started up to two years after the payment of the balance. They will be formally
notified to the coordinator or beneficiary concerned and will be considered to have started on the date
of the formal notification.
If the review is carried out on a third party (see Articles 10 to 16), the beneficiary concerned must
inform the third party.
The Commission may carry out reviews directly (using its own staff) or indirectly (using external
persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned of the
identity of the external persons or bodies. They have the right to object to the appointment on grounds
of commercial confidentiality.
The coordinator or beneficiary concerned must provide — within the deadline requested — any
information and data in addition to deliverables and reports already submitted (including information
on the use of resources). The Commission may request beneficiaries to provide such information to
it directly.
The coordinator or beneficiary concerned may be requested to participate in meetings, including with
external experts.
For on-the-spot reviews, the beneficiaries must allow access to their sites and premises, including to
external persons or bodies, and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
On the basis of the review findings, a ‘review report’ will be drawn up.
The Commission will formally notify the review report to the coordinator or beneficiary concerned,
which has 30 days to formally notify observations (‘contradictory review procedure’).
Reviews (including review reports) are in the language of the Agreement.
22.1.3 Right to carry out audits
38
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
The Commission may — during the implementation of the action or afterwards — carry out audits on
the proper implementation of the action and compliance with the obligations under the Agreement.
Audits may be started up to two years after the payment of the balance. They will be formally notified
to the coordinator or beneficiary concerned and will be considered to have started on the date of the
formal notification.
If the audit is carried out on a third party (see Articles 10 to 16), the beneficiary concerned must
inform the third party.
The Commission may carry out audits directly (using its own staff) or indirectly (using external
persons or bodies appointed to do so). It will inform the coordinator or beneficiary concerned of the
identity of the external persons or bodies. They have the right to object to the appointment on grounds
of commercial confidentiality.
The coordinator or beneficiary concerned must provide — within the deadline requested — any
information (including complete accounts, individual salary statements or other personal data) to
verify compliance with the Agreement. The Commission may request beneficiaries to provide such
information to it directly.
For on-the-spot audits, the beneficiaries must allow access to their sites and premises, including to
external persons or bodies, and must ensure that information requested is readily available.
Information provided must be accurate, precise and complete and in the format requested, including
electronic format.
On the basis of the audit findings, a ‘draft audit report’ will be drawn up.
The Commission will formally notify the draft audit report to the coordinator or beneficiary concerned,
which has 30 days to formally notify observations (‘contradictory audit procedure’). This period
may be extended by the Commission in justified cases.
The ‘final audit report’ will take into account observations by the coordinator or beneficiary
concerned. The report will be formally notified to it.
Audits (including audit reports) are in the language of the Agreement.
The Commission may also access the beneficiaries’ statutory records for the periodical assessment
of unit costs or flat-rate amounts.
22.2 Investigations by the European Anti-Fraud Office (OLAF)
Under Regulations No 883/201311 and No 2185/9612 (and in accordance with their provisions and
procedures) the European Anti-Fraud Office (OLAF) may — at any moment during implementation
of the action or afterwards — carry out investigations, including on-the-spot checks and inspections,
to establish whether there has been fraud, corruption or any other illegal activity affecting the financial
interests of the EU.
11 Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013
concerning investigations conducted by the European Anti-Fraud Office (OLAF) and repealing Regulation (EC) No
1073/1999 of the European Parliament and of the Council and Council Regulation (Euratom) No 1074/1999 (OJ L 248,
18.09.2013, p. 1).
39
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
22.3 Checks and audits by the European Court of Auditors (ECA)
Under Article 287 of the Treaty on the Functioning of the European Union (TFEU) and Article 161
of the Financial Regulation No 966/201214, the European Court of Auditors (ECA) may — at any
moment during implementation of the action or afterwards — carry out audits.
The ECA has the right of access for the purpose of checks and audits.
22.4 Checks, reviews, audits and investigations for international organisations
Not applicable
22.5 Consequences of findings in checks, reviews, audits and investigations — Extension of
findings
22.5.1 Findings in this grant
Findings in checks, reviews, audits or investigations carried out in the context of this grant may lead
to the rejection of ineligible costs (see Article 42), reduction of the grant (see Article 43), recovery of
undue amounts (see Article 44) or to any of the other measures described in Chapter 6.
Rejection of costs or reduction of the grant after the payment of the balance will lead to a revised final
grant amount (see Article 5.4).
Findings in checks, reviews, audits or investigations may lead to a request for amendment for the
modification of Annex 1 (see Article 55).
Checks, reviews, audits or investigations that find systemic or recurrent errors, irregularities, fraud or
breach of obligations may also lead to consequences in other EU or Euratom grants awarded under
similar conditions (‘extension of findings from this grant to other grants’).
Moreover, findings arising from an OLAF investigation may lead to criminal prosecution under
national law.
22.5.2 Findings in other grants
The Commission may extend findings from other grants to this grant (‘extension of findings from
other grants to this grant’), if:
(a) the beneficiary concerned is found, in other EU or Euratom grants awarded under similar
conditions, to have committed systemic or recurrent errors, irregularities, fraud or breach of
obligations that have a material impact on this grant and
(b) those findings are formally notified to the beneficiary concerned — together with the list of
grants affected by the findings — no later than two years after the payment of the balance of
this grant.
12 Council Regulation (Euratom, EC) No 2185/1996 of 11 November 1996 concerning on-the-spot checks and inspections
carried out by the Commission in order to protect the European Communities' financial interests against fraud and other
irregularities (OJ L 292, 15.11.1996, p. 2).
14 Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on the
financial rules applicable to the general budget of the Union and repealing Council Regulation (EC, Euratom) No
1605/2002 (OJ L 298, 26.10.2012, p. 1).
40
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
The extension of findings may lead to the rejection of costs (see Article 42), reduction of the grant
(see Article 43), recovery of undue amounts (see Article 44), suspension of payments (see Article 48),
suspension of the action implementation (see Article 49) or termination (see Article 50).
22.5.3 Procedure
The Commission will formally notify the beneficiary concerned the systemic or recurrent errors and
its intention to extend these audit findings, together with the list of grants affected.
22.5.3.1 If the findings concern eligibility of costs: the formal notification will include:
(a) an invitation to submit observations on the list of grants affected by the findings;
(b) the request to submit revised financial statements for all grants affected;
(c) the correction rate for extrapolation established by the Commission on the basis of the
systemic or recurrent errors, to calculate the amounts to be rejected if the beneficiary concerned:
(i) considers that the submission of revised financial statements is not possible or practicable
or
(ii) does not submit revised financial statements.
The beneficiary concerned has 90 days from receiving notification to submit observations, revised
financial statements or to propose a duly substantiated alternative correction method. This period
may be extended by the Commission in justified cases.
The Commission may then start a rejection procedure in accordance with Article 42, on the basis of:
- the revised financial statements, if approved;
- the proposed alternative correction method, if accepted
or
- the initially notified correction rate for extrapolation, if it does not receive any observations
or revised financial statements, does not accept the observations or the proposed alternative
correction method or does not approve the revised financial statements.
22.5.3.2 If the findings concern substantial errors, irregularities or fraud or serious breach of
obligations: the formal notification will include:
(a) an invitation to submit observations on the list of grants affected by the findings and
(b) the flat-rate the Commission intends to apply according to the principle of proportionality.
The beneficiary concerned has 90 days from receiving notification to submit observations or to
propose a duly substantiated alternative flat-rate.
The Commission may then start a reduction procedure in accordance with Article 43, on the basis of:
- the proposed alternative flat-rate, if accepted
or
41
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
- the initially notified flat-rate, if it does not receive any observations or does not accept the
observations or the proposed alternative flat-rate.
22.6 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, any insufficiently substantiated costs
will be ineligible (see Article 6) and will be rejected (see Article 42).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 23 — EVALUATION OF THE IMPACT OF THE ACTION
23.1 Right to evaluate the impact of the action
The Commission may carry out interim and final evaluations of the impact of the action measured
against the objective of the EU programme.
Evaluations may be started during implementation of the action and up to five years after the payment
of the balance. The evaluation is considered to start on the date of the formal notification to the
coordinator or beneficiaries.
The Commission may make these evaluations directly (using its own staff) or indirectly (using external
bodies or persons it has authorised to do so).
The coordinator or beneficiaries must provide any information relevant to evaluate the impact of the
action, including information in electronic format.
23.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the Commission may apply the
measures described in Chapter 6.
SECTION 3 RIGHTS AND OBLIGATIONS RELATED TO BACKGROUND AND
RESULTS
SUBSECTION 1 GENERAL
ARTICLE 23a — MANAGEMENT OF INTELLECTUAL PROPERTY
23a.1 Obligation to take measures to implement the Commission Recommendation on the
management of intellectual property in knowledge transfer activities
Beneficiaries that are universities or other public research organisations must take measures to
implement the principles set out in Points 1 and 2 of the Code of Practice annexed to the Commission
Recommendation on the management of intellectual property in knowledge transfer activities14.
14 Commission Recommendation C(2008) 1329 of 10.4.2008 on the management of intellectual property in knowledge
transfer activities and the Code of Practice for universities and other public research institutions attached to this
recommendation.
42
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
This does not change the obligations set out in Subsections 2 and 3 of this Section.
The beneficiaries must ensure that researchers and third parties involved in the action are aware of
them.
23a.2 Consequences of non-compliance
If a beneficiary breaches its obligations under this Article, the Commission may apply any of the
measures described in Chapter 6.
SUBSECTION 2 RIGHTS AND OBLIGATIONS RELATED TO BACKGROUND
ARTICLE 24 — AGREEMENT ON BACKGROUND
24.1 Agreement on background
The beneficiaries must identify and agree (in writing) on the background for the action (‘agreement
on background’).
‘Background’ means any data, know-how or information — whatever its form or nature (tangible or
intangible), including any rights such as intellectual property rights — that:
(a) is held by the beneficiaries before they acceded to the Agreement, and
(b) is needed to implement the action or exploit the results.
24.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 25 — ACCESS RIGHTS TO BACKGROUND
25.1 Exercise of access rights — Waiving of access rights — No sub-licensing
To exercise access rights, this must first be requested in writing (‘request for access’).
‘Access rights’ means rights to use results or background under the terms and conditions laid down
in this Agreement.
Waivers of access rights are not valid unless in writing.
Unless agreed otherwise, access rights do not include the right to sub-license.
25.2 Access rights for other beneficiaries, for implementing their own tasks under the action
The beneficiaries must give each other access — on a royalty-free basis — to background needed to
implement their own tasks under the action, unless the beneficiary that holds the background has —
before acceding to the Agreement —:
43
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
(a) informed the other beneficiaries that access to its background is subject to legal restrictions or
limits, including those imposed by the rights of third parties (including personnel), or
(b) agreed with the other beneficiaries that access would not be on a royalty-free basis.
25.3 Access rights for other beneficiaries, for exploiting their own results
The beneficiaries must give each other access — under fair and reasonable conditions — to
background needed for exploiting their own results, unless the beneficiary that holds the background
has — before acceding to the Agreement — informed the other beneficiaries that access to its
background is subject to legal restrictions or limits, including those imposed by the rights of third
parties (including personnel).
‘Fair and reasonable conditions’ means appropriate conditions, including possible financial terms
or royalty-free conditions, taking into account the specific circumstances of the request for access, for
example the actual or potential value of the results or background to which access is requested and/or
the scope, duration or other characteristics of the exploitation envisaged.
Requests for access may be made — unless agreed otherwise — up to one year after the period set
out in Article 3.
25.4 Access rights for affiliated entities
Unless otherwise agreed in the consortium agreement, access to background must also be given
— under fair and reasonable conditions (see above; Article 25.3) and unless it is subject to legal
restrictions or limits, including those imposed by the rights of third parties (including personnel) —
to affiliated entities15 established in an EU Member State or ‘associated country’16, if this is needed
to exploit the results generated by the beneficiaries to which they are affiliated.
Unless agreed otherwise (see above; Article 25.1), the affiliated entity concerned must make the
request directly to the beneficiary that holds the background.
Requests for access may be made — unless agreed otherwise — up to one year after the period set
out in Article 3.
15 For the definition see Article 2.1(2) Rules for Participation Regulation No 1290/2013: ‘affiliated entity’ means any
legal entity that is:
- under the direct or indirect control of a participant, or
- under the same direct or indirect control as the participant, or
- directly or indirectly controlling a participant.
‘Control’ may take any of the following forms:
(a) the direct or indirect holding of more than 50% of the nominal value of the issued share capital in the legal entity
concerned, or of a majority of the voting rights of the shareholders or associates of that entity;
(b) the direct or indirect holding, in fact or in law, of decision-making powers in the legal entity concerned.
However the following relationships between legal entities shall not in themselves be deemed to constitute controlling
relationships:
(a) the same public investment corporation, institutional investor or venture-capital company has a direct or indirect
holding of more than 50% of the nominal value of the issued share capital or a majority of voting rights of the
shareholders or associates;
(b) the legal entities concerned are owned or supervised by the same public body.
16 For the definition, see Article 2.1(3) of the Rules for Participation Regulation No 1290/2013: ‘associated country’
means a third country which is party to an international agreement with the Union, as identified in Article 7 of Horizon
2020 Framework Programme Regulation No 1291/2013. Article 7 sets out the conditions for association of non-EU
countries to Horizon 2020.
44
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
25.5 Access rights for third parties
Not applicable
25.6 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
SUBSECTION 3 RIGHTS AND OBLIGATIONS RELATED TO RESULTS
ARTICLE 26 — OWNERSHIP OF RESULTS
26.1 Ownership by the beneficiary that generates the results
Results are owned by the beneficiary that generates them.
‘Results’ means any (tangible or intangible) output of the action such as data, knowledge or
information — whatever its form or nature, whether it can be protected or not — that is generated in
the action, as well as any rights attached to it, including intellectual property rights.
26.2 Joint ownership by several beneficiaries
Two or more beneficiaries own results jointly if:
(a) they have jointly generated them and
(b) it is not possible to:
(i) establish the respective contribution of each beneficiary, or
(ii) separate them for the purpose of applying for, obtaining or maintaining their protection
(see Article 27).
The joint owners must agree (in writing) on the allocation and terms of exercise of their joint ownership
(‘joint ownership agreement’), to ensure compliance with their obligations under this Agreement.
Unless otherwise agreed in the joint ownership agreement, each joint owner may grant non-exclusive
licences to third parties to exploit jointly-owned results (without any right to sub-license), if the other
joint owners are given:
(a) at least 45 days advance notice and
(b) fair and reasonable compensation.
Once the results have been generated, joint owners may agree (in writing) to apply another regime
than joint ownership (such as, for instance, transfer to a single owner (see Article 30) with access
rights for the others).
26.3 Rights of third parties (including personnel)
45
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
If third parties (including personnel) may claim rights to the results, the beneficiary concerned must
ensure that it complies with its obligations under the Agreement.
If a third party generates results, the beneficiary concerned must obtain all necessary rights (transfer,
licences or other) from the third party, in order to be able to respect its obligations as if those results
were generated by the beneficiary itself.
If obtaining the rights is impossible, the beneficiary must refrain from using the third party to generate
the results.
26.4 EU ownership, to protect results
26.4.1 The EU may — with the consent of the beneficiary concerned — assume ownership of results
to protect them, if a beneficiary intends — up to four years after the period set out in Article 3 — to
disseminate its results without protecting them, except in any of the following cases:
(a) the lack of protection is because protecting the results is not possible, reasonable or justified
(given the circumstances);
(b) the lack of protection is because there is a lack of potential for commercial or industrial
exploitation, or
(c) the beneficiary intends to transfer the results to another beneficiary or third party established
in an EU Member State or associated country, which will protect them.
Before the results are disseminated and unless any of the cases above under Points (a), (b) or (c)
applies, the beneficiary must formally notify the Commission and at the same time inform it of any
reasons for refusing consent. The beneficiary may refuse consent only if it can show that its legitimate
interests would suffer significant harm.
If the Commission decides to assume ownership, it will formally notify the beneficiary concerned
within 45 days of receiving notification.
No dissemination relating to these results may take place before the end of this period or, if the
Commission takes a positive decision, until it has taken the necessary steps to protect the results.
26.4.2 The EU may — with the consent of the beneficiary concerned — assume ownership of results
to protect them, if a beneficiary intends — up to four years after the period set out in Article 3 — to
stop protecting them or not to seek an extension of protection, except in any of the following cases:
(a) the protection is stopped because of a lack of potential for commercial or industrial exploitation;
(b) an extension would not be justified given the circumstances.
A beneficiary that intends to stop protecting results or not seek an extension must — unless any of
the cases above under Points (a) or (b) applies — formally notify the Commission at least 60 days
before the protection lapses or its extension is no longer possible and at the same time inform it of any
reasons for refusing consent. The beneficiary may refuse consent only if it can show that its legitimate
interests would suffer significant harm.
If the Commission decides to assume ownership, it will formally notify the beneficiary concerned
within 45 days of receiving notification.
46
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
26.5 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 43).
Such breaches may also lead to the any of the other measures described in Chapter 6.
ARTICLE 27 — PROTECTION OF RESULTS — VISIBILITY OF EU FUNDING
27.1 Obligation to protect the results
Each beneficiary must examine the possibility of protecting its results and must adequately protect
them — for an appropriate period and with appropriate territorial coverage — if:
(a) the results can reasonably be expected to be commercially or industrially exploited and
(b) protecting them is possible, reasonable and justified (given the circumstances).
When deciding on protection, the beneficiary must consider its own legitimate interests and the
legitimate interests (especially commercial) of the other beneficiaries.
27.2 EU ownership, to protect the results
If a beneficiary intends not to protect its results, to stop protecting them or not seek an extension of
protection, the EU may — under certain conditions (see Article 26.4) — assume ownership to ensure
their (continued) protection.
27.3 Information on EU funding
Applications for protection of results (including patent applications) filed by or on behalf of a
beneficiary must — unless the Commission requests or agrees otherwise or unless it is impossible
— include the following:
“The project leading to this application has received funding from the European Union’s Horizon 2020
research and innovation programme under grant agreement No 779282”.
27.4 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 43).
Such a breach may also lead to any of the other measures described in Chapter 6.
ARTICLE 28 — EXPLOITATION OF RESULTS
28.1 Obligation to exploit the results
Each beneficiary must — up to four years after the period set out in Article 3 — take measures aiming
to ensure ‘exploitation’ of its results (either directly or indirectly, in particular through transfer or
licensing; see Article 30) by:
(a) using them in further research activities (outside the action);
47
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
(b) developing, creating or marketing a product or process;
(c) creating and providing a service, or
(d) using them in standardisation activities.
This does not change the security obligations in Article 37, which still apply.
28.2 Results that could contribute to European or international standards — Information on
EU funding
If results are incorporated in a standard, the beneficiary concerned must — unless the Commission
requests or agrees otherwise or unless it is impossible — ask the standardisation body to include the
following statement in (information related to) the standard:
“Results incorporated in this standard received funding from the European Union’s Horizon 2020 research
and innovation programme under grant agreement No 779282”.
28.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced in
accordance with Article 43.
Such a breach may also lead to any of the other measures described in Chapter 6.
ARTICLE 29 — DISSEMINATION OF RESULTS — OPEN ACCESS — VISIBILITY OF
EU FUNDING
29.1 Obligation to disseminate results
Unless it goes against their legitimate interests, each beneficiary must — as soon as possible —
‘disseminate’ its results by disclosing them to the public by appropriate means (other than those
resulting from protecting or exploiting the results), including in scientific publications (in any
medium).
This does not change the obligation to protect results in Article 27, the confidentiality obligations in
Article 36, the security obligations in Article 37 or the obligations to protect personal data in Article 39,
all of which still apply.
A beneficiary that intends to disseminate its results must give advance notice to the other beneficiaries
of — unless agreed otherwise — at least 45 days, together with sufficient information on the results
it will disseminate.
Any other beneficiary may object within — unless agreed otherwise — 30 days of receiving
notification, if it can show that its legitimate interests in relation to the results or background would
be significantly harmed. In such cases, the dissemination may not take place unless appropriate steps
are taken to safeguard these legitimate interests.
If a beneficiary intends not to protect its results, it may — under certain conditions (see Article 26.4.1)
— need to formally notify the Commission before dissemination takes place.
29.2 Open access to scientific publications
48
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
Each beneficiary must ensure open access (free of charge online access for any user) to all
peer-reviewed scientific publications relating to its results.
In particular, it must:
(a) as soon as possible and at the latest on publication, deposit a machine-readable electronic
copy of the published version or final peer-reviewed manuscript accepted for publication in a
repository for scientific publications;
Moreover, the beneficiary must aim to deposit at the same time the research data needed to
validate the results presented in the deposited scientific publications.
(b) ensure open access to the deposited publication — via the repository — at the latest:
(i) on publication, if an electronic version is available for free via the publisher, or
(ii) within six months of publication (twelve months for publications in the social sciences
and humanities) in any other case.
(c) ensure open access — via the repository — to the bibliographic metadata that identify the
deposited publication.
The bibliographic metadata must be in a standard format and must include all of the following:
- the terms “European Union (EU)” and “Horizon 2020”;
- the name of the action, acronym and grant number;
- the publication date, and length of embargo period if applicable, and
- a persistent identifier.
29.3 Open access to research data
Not applicable
29.4 Information on EU funding — Obligation and right to use the EU emblem
Unless the Commission requests or agrees otherwise or unless it is impossible, any dissemination of
results (in any form, including electronic) must:
(a) display the EU emblem and
(b) include the following text:
“This project has received funding from the European Union’s Horizon 2020 research and innovation
programme under grant agreement No 779282”.
When displayed together with another logo, the EU emblem must have appropriate prominence.
For the purposes of their obligations under this Article, the beneficiaries may use the EU emblem
without first obtaining approval from the Commission.
This does not however give them the right to exclusive use.
49
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
Moreover, they may not appropriate the EU emblem or any similar trademark or logo, either by
registration or by any other means.
29.5 Disclaimer excluding Commission responsibility
Any dissemination of results must indicate that it reflects only the author's view and that the
Commission is not responsible for any use that may be made of the information it contains.
29.6 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 43).
Such a breach may also lead to any of the other measures described in Chapter 6.
ARTICLE 30 — TRANSFER AND LICENSING OF RESULTS
30.1 Transfer of ownership
Each beneficiary may transfer ownership of its results.
It must however ensure that its obligations under Articles 26.2, 26.4, 27, 28, 29, 30 and 31 also apply
to the new owner and that this owner has the obligation to pass them on in any subsequent transfer.
This does not change the security obligations in Article 37, which still apply.
Unless agreed otherwise (in writing) for specifically-identified third parties or unless impossible under
applicable EU and national laws on mergers and acquisitions, a beneficiary that intends to transfer
ownership of results must give at least 45 days advance notice (or less if agreed in writing) to the
other beneficiaries that still have (or still may request) access rights to the results. This notification
must include sufficient information on the new owner to enable any beneficiary concerned to assess
the effects on its access rights.
Unless agreed otherwise (in writing) for specifically-identified third parties, any other beneficiary
may object within 30 days of receiving notification (or less if agreed in writing), if it can show that
the transfer would adversely affect its access rights. In this case, the transfer may not take place until
agreement has been reached between the beneficiaries concerned.
30.2 Granting licenses
Each beneficiary may grant licences to its results (or otherwise give the right to exploit them), if:
(a) this does not impede the access rights under Article 31 and
(b) not applicable.
In addition to Points (a) and (b), exclusive licences for results may be granted only if all the other
beneficiaries concerned have waived their access rights (see Article 31.1).
This does not change the dissemination obligations in Article 29 or security obligations in Article 37,
which still apply.
50
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
30.3 Commission right to object to transfers or licensing
Not applicable
30.4 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 43).
Such a breach may also lead to any of the other measures described in Chapter 6.
ARTICLE 31 — ACCESS RIGHTS TO RESULTS
31.1 Exercise of access rights — Waiving of access rights — No sub-licensing
The conditions set out in Article 25.1 apply.
The obligations set out in this Article do not change the security obligations in Article 37, which still
apply.
31.2 Access rights for other beneficiaries, for implementing their own tasks under the action
The beneficiaries must give each other access — on a royalty-free basis — to results needed for
implementing their own tasks under the action.
31.3 Access rights for other beneficiaries, for exploiting their own results
The beneficiaries must give each other — under fair and reasonable conditions (see Article 25.3) —
access to results needed for exploiting their own results.
Requests for access may be made — unless agreed otherwise — up to one year after the period set
out in Article 3.
31.4 Access rights of affiliated entities
Unless agreed otherwise in the consortium agreement, access to results must also be given — under
fair and reasonable conditions (Article 25.3) — to affiliated entities established in an EU Member
State or associated country, if this is needed for those entities to exploit the results generated by the
beneficiaries to which they are affiliated.
Unless agreed otherwise (see above; Article 31.1), the affiliated entity concerned must make any such
request directly to the beneficiary that owns the results.
Requests for access may be made — unless agreed otherwise — up to one year after the period set
out in Article 3.
31.5 Access rights for the EU institutions, bodies, offices or agencies and EU Member States
The beneficiaries must give access to their results — on a royalty-free basis — to EU institutions,
bodies, offices or agencies, for developing, implementing or monitoring EU policies or programmes.
Such access rights are limited to non-commercial and non-competitive use.
51
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
This does not change the right to use any material, document or information received from the
beneficiaries for communication and publicising activities (see Article 38.2).
31.6 Access rights for third parties
Not applicable
31.7 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
SECTION 4 OTHER RIGHTS AND OBLIGATIONS
ARTICLE 32 — RECRUITMENT AND WORKING CONDITIONS FOR RESEARCHERS
32.1 Obligation to take measures to implement the European Charter for Researchers and
Code of Conduct for the Recruitment of Researchers
The beneficiaries must take all measures to implement the principles set out in the Commission
Recommendation on the European Charter for Researchers and the Code of Conduct for the
Recruitment of Researchers18, in particular regarding:
- working conditions;
- transparent recruitment processes based on merit, and
- career development.
The beneficiaries must ensure that researchers and third parties involved in the action are aware of
them.
32.2 Consequences of non-compliance
If a beneficiary breaches its obligations under this Article, the Commission may apply any of the
measures described in Chapter 6.
ARTICLE 33 — GENDER EQUALITY
33.1 Obligation to aim for gender equality
The beneficiaries must take all measures to promote equal opportunities between men and women in
the implementation of the action. They must aim, to the extent possible, for a gender balance at all
levels of personnel assigned to the action, including at supervisory and managerial level.
33.2 Consequences of non-compliance
18 Commission Recommendation 2005/251/EC of 11 March 2005 on the European Charter for Researchers and on a Code
of Conduct for the Recruitment of Researchers (OJ L 75, 22.3.2005, p. 67).
52
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
If a beneficiary breaches its obligations under this Article, the Commission may apply any of the
measures described in Chapter 6.
ARTICLE 34 — ETHICS AND RESEARCH INTEGRITY
34.1 Obligation to comply with ethical and research integrity principles
The beneficiaries must carry out the action in compliance with:
(a) ethical principles (including the highest standards of research integrity)
and
(b) applicable international, EU and national law.
Funding will not be granted for activities carried out outside the EU if they are prohibited in all
Member States or for activities which destroy human embryos (for example, for obtaining stem cells).
The beneficiaries must ensure that the activities under the action have an exclusive focus on civil
applications.
The beneficiaries must ensure that the activities under the action do not:
(a) aim at human cloning for reproductive purposes;
(b) intend to modify the genetic heritage of human beings which could make such changes heritable
(with the exception of research relating to cancer treatment of the gonads, which may be
financed), or
(c) intend to create human embryos solely for the purpose of research or for the purpose of stem
cell procurement, including by means of somatic cell nuclear transfer.
The beneficiaries must respect the highest standards of research integrity — as set out, for instance,
in the European Code of Conduct for Research Integrity19.
This implies notably compliance with the following essential principles:
- honesty;
- reliability;
- objectivity;
- impartiality;
- open communication;
- duty of care;
19 The European Code of Conduct for Research Integrity of ALLEA (All European Academies) and ESF (European
Science Foundation) of March 2011.
http://ec.europa.eu/research/participants/data/ref/h2020/other/hi/h2020-ethics_code-of-conduct_en.pdf
53
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
- fairness and
- responsibility for future science generations.
This means that beneficiaries must ensure that persons carrying out research tasks:
- present their research goals and intentions in an honest and transparent manner;
- design their research carefully and conduct it in a reliable fashion, taking its impact on society
into account;
- use techniques and methodologies (including for data collection and management) that are
appropriate for the field(s) concerned;
- exercise due care for the subjects of research — be they human beings, animals, the
environment or cultural objects;
- ensure objectivity, accuracy and impartiality when disseminating the results;
- allow — as much as possible and taking into account the legitimate interest of the beneficiaries
— access to research data, in order to enable research to be reproduced;
- make the necessary references to their work and that of other researchers;
- refrain from practicing any form of plagiarism, data falsification or fabrication;
- avoid double funding, conflicts of interest and misrepresentation of credentials or other research
misconduct.
34.2 Activities raising ethical issues
Activities raising ethical issues must comply with the ‘ethics requirements’ set out as deliverables
in Annex 1.
Before the beginning of an activity raising an ethical issue, each beneficiary must have obtained:
(a) any ethics committee opinion required under national law and
(b) any notification or authorisation for activities raising ethical issues required under national and/
or European law
needed for implementing the action tasks in question.
The documents must be kept on file and be submitted upon request by the coordinator to the
Commission (see Article 52). If they are not in English, they must be submitted together with
an English summary, which shows that the action tasks in question are covered and includes the
conclusions of the committee or authority concerned (if available).
34.3 Activities involving human embryos or human embryonic stem cells
Activities involving research on human embryos or human embryonic stem cells may be carried out,
in addition to Article 34.1, only if:
54
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
- they are set out in Annex 1 or
- the coordinator has obtained explicit approval (in writing) from the Commission (see
Article 52).
34.4 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 43) and the Agreement or participation of the beneficiary may be terminated (see Article 50).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 35 — CONFLICT OF INTERESTS
35.1 Obligation to avoid a conflict of interests
The beneficiaries must take all measures to prevent any situation where the impartial and objective
implementation of the action is compromised for reasons involving economic interest, political or
national affinity, family or emotional ties or any other shared interest (‘conflict of interests’).
They must formally notify to the Commission without delay any situation constituting or likely to
lead to a conflict of interests and immediately take all the necessary steps to rectify this situation.
The Commission may verify that the measures taken are appropriate and may require additional
measures to be taken by a specified deadline.
35.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 43) and the Agreement or participation of the beneficiary may be terminated (see Article 50).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 36 — CONFIDENTIALITY
36.1 General obligation to maintain confidentiality
During implementation of the action and for four years after the period set out in Article 3, the
parties must keep confidential any data, documents or other material (in any form) that is identified
as confidential at the time it is disclosed (‘confidential information’).
If a beneficiary requests, the Commission may agree to keep such information confidential for an
additional period beyond the initial four years.
If information has been identified as confidential only orally, it will be considered to be confidential
only if this is confirmed in writing within 15 days of the oral disclosure.
Unless otherwise agreed between the parties, they may use confidential information only to implement
the Agreement.
The beneficiaries may disclose confidential information to their personnel or third parties involved
in the action only if they:
55
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
(a) need to know to implement the Agreement and
(b) are bound by an obligation of confidentiality.
This does not change the security obligations in Article 37, which still apply.
The Commission may disclose confidential information to its staff, other EU institutions and bodies.
It may disclose confidential information to third parties, if:
(a) this is necessary to implement the Agreement or safeguard the EU's financial interests and
(b) the recipients of the information are bound by an obligation of confidentiality.
Under the conditions set out in Article 4 of the Rules for Participation Regulation No 1290/201320,
the Commission must moreover make available information on the results to other EU institutions,
bodies, offices or agencies as well as Member States or associated countries.
The confidentiality obligations no longer apply if:
(a) the disclosing party agrees to release the other party;
(b) the information was already known by the recipient or is given to him without obligation of
confidentiality by a third party that was not bound by any obligation of confidentiality;
(c) the recipient proves that the information was developed without the use of confidential
information;
(d) the information becomes generally and publicly available, without breaching any
confidentiality obligation, or
(e) the disclosure of the information is required by EU or national law.
36.2 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 37 — SECURITY-RELATED OBLIGATIONS
37.1 Results with a security recommendation
Not applicable
37.2 Classified information
Not applicable
20 Regulation (EU) No 1290/2013 of the European Parliament and of the Council of 11 December 2013 laying down the
rules for participation and dissemination in "Horizon 2020 - the Framework Programme for Research and Innovation
(2014-2020)" (OJ L 347, 20.12.2013 p.81).
56
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
37.3 Activities involving dual-use goods or dangerous materials and substances
Not applicable
37.4 Consequences of non-compliance
Not applicable
ARTICLE 38 — PROMOTING THE ACTION — VISIBILITY OF EU FUNDING
38.1 Communication activities by beneficiaries
38.1.1 Obligation to promote the action and its results
The beneficiaries must promote the action and its results, by providing targeted information to multiple
audiences (including the media and the public) in a strategic and effective manner.
This does not change the dissemination obligations in Article 29, the confidentiality obligations in
Article 36 or the security obligations in Article 37, all of which still apply.
Before engaging in a communication activity expected to have a major media impact, the beneficiaries
must inform the Commission (see Article 52).
38.1.2 Information on EU funding — Obligation and right to use the EU emblem
Unless the Commission requests or agrees otherwise or unless it is impossible, any communication
activity related to the action (including in electronic form, via social media, etc.) and any
infrastructure, equipment and major results funded by the grant must:
(a) display the EU emblem and
(b) include the following text:
For communication activities: “This project has received funding from the European Union’s Horizon
2020 research and innovation programme under grant agreement No 779282”.
For infrastructure, equipment and major results: “This [infrastructure][equipment][insert type of result] is
part of a project that has received funding from the European Union’s Horizon 2020 research and innovation
programme under grant agreement No 779282”.
When displayed together with another logo, the EU emblem must have appropriate prominence.
For the purposes of their obligations under this Article, the beneficiaries may use the EU emblem
without first obtaining approval from the Commission.
This does not, however, give them the right to exclusive use.
Moreover, they may not appropriate the EU emblem or any similar trademark or logo, either by
registration or by any other means.
38.1.3 Disclaimer excluding Commission responsibility
Any communication activity related to the action must indicate that it reflects only the author's view
and that the Commission is not responsible for any use that may be made of the information it contains.
57
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
38.2 Communication activities by the Commission
38.2.1 Right to use beneficiaries’ materials, documents or information
The Commission may use, for its communication and publicising activities, information relating
to the action, documents notably summaries for publication and public deliverables as well as any
other material, such as pictures or audio-visual material received from any beneficiary (including in
electronic form).
This does not change the confidentiality obligations in Article 36 and the security obligations in
Article 37, all of which still apply.
If the Commission’s use of these materials, documents or information would risk compromising
legitimate interests, the beneficiary concerned may request the Commission not to use it (see
Article 52).
The right to use a beneficiary’s materials, documents and information includes:
(a) use for its own purposes (in particular, making them available to persons working for the
Commission or any other EU institution, body, office or agency or body or institutions in EU
Member States; and copying or reproducing them in whole or in part, in unlimited numbers);
(b) distribution to the public (in particular, publication as hard copies and in electronic or digital
format, publication on the internet, as a downloadable or non-downloadable file, broadcasting
by any channel, public display or presentation, communicating through press information
services, or inclusion in widely accessible databases or indexes);
(c) editing or redrafting for communication and publicising activities (including shortening,
summarising, inserting other elements (such as meta-data, legends, other graphic, visual, audio
or text elements), extracting parts (e.g. audio or video files), dividing into parts, use in a
compilation);
(d) translation;
(e) giving access in response to individual requests under Regulation No 1049/200122, without
the right to reproduce or exploit;
(f) storage in paper, electronic or other form;
(g) archiving, in line with applicable document-management rules, and
(h) the right to authorise third parties to act on its behalf or sub-license the modes of use set out
in Points (b), (c), (d) and (f) to third parties if needed for the communication and publicising
activities of the Commission.
If the right of use is subject to rights of a third party (including personnel of the beneficiary), the
beneficiary must ensure that it complies with its obligations under this Agreement (in particular, by
obtaining the necessary approval from the third parties concerned).
22 Regulation (EC) No 1049/2001 of the European Parliament and of the Council of 30 May 2001 regarding public access
to European Parliament, Council and Commission documents, OJ L 145, 31.5.2001, p. 43.
58
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
Where applicable (and if provided by the beneficiaries), the Commission will insert the following
information:
“© – [year] – [name of the copyright owner]. All rights reserved. Licensed to the European Union (EU)
under conditions.”
38.3 Consequences of non-compliance
If a beneficiary breaches any of its obligations under this Article, the grant may be reduced (see
Article 43).
Such breaches may also lead to any of the other measures described in Chapter 6.
ARTICLE 39 — PROCESSING OF PERSONAL DATA
39.1 Processing of personal data by the Commission
Any personal data under the Agreement will be processed by the Commission under Regulation
No 45/200123 and according to the ‘notifications of the processing operations’ to the Data Protection
Officer (DPO) of the Commission (publicly accessible in the DPO register).
Such data will be processed by the ‘data controller’ of the Commission for the purposes of
implementing, managing and monitoring the Agreement or protecting the financial interests of the
EU or Euratom (including checks, reviews, audits and investigations; see Article 22).
The persons whose personal data are processed have the right to access and correct their own personal
data. For this purpose, they must send any queries about the processing of their personal data to the
data controller, via the contact point indicated in the privacy statement(s) that are published on the
Commission websites.
They also have the right to have recourse at any time to the European Data Protection Supervisor
(EDPS).
39.2 Processing of personal data by the beneficiaries
The beneficiaries must process personal data under the Agreement in compliance with applicable EU
and national law on data protection (including authorisations or notification requirements).
The beneficiaries may grant their personnel access only to data that is strictly necessary for
implementing, managing and monitoring the Agreement.
The beneficiaries must inform the personnel whose personal data are collected and processed by the
Commission. For this purpose, they must provide them with the privacy statement(s) (see above),
before transmitting their data to the Commission.
39.3 Consequences of non-compliance
23 Regulation (EC) No 45/2001 of the European Parliament and of the Council of 18 December 2000 on the protection
of individuals with regard to the processing of personal data by the Community institutions and bodies and on the free
movement of such data (OJ L 8, 12.01.2001, p. 1).
59
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
If a beneficiary breaches any of its obligations under Article 39.2, the Commission may apply any of
the measures described in Chapter 6.
ARTICLE 40 — ASSIGNMENTS OF CLAIMS FOR PAYMENT AGAINST THE
COMMISSION
The beneficiaries may not assign any of their claims for payment against the Commission to any
third party, except if approved by the Commission on the basis of a reasoned, written request by the
coordinator (on behalf of the beneficiary concerned).
If the Commission has not accepted the assignment or the terms of it are not observed, the assignment
will have no effect on it.
In no circumstances will an assignment release the beneficiaries from their obligations towards the
Commission.
CHAPTER 5 DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES
— RELATIONSHIP WITH COMPLEMENTARY BENEFICIARIES —
RELATIONSHIP WITH PARTNERS OF A JOINT ACTION
ARTICLE 41 — DIVISION OF BENEFICIARIES’ ROLES AND RESPONSIBILITIES
— RELATIONSHIP WITH COMPLEMENTARY BENEFICIARIES —
RELATIONSHIP WITH PARTNERS OF A JOINT ACTION
41.1 Roles and responsibility towards the Commission
The beneficiaries have full responsibility for implementing the action and complying with the
Agreement.
The beneficiaries are jointly and severally liable for the technical implementation of the action as
described in Annex 1. If a beneficiary fails to implement its part of the action, the other beneficiaries
become responsible for implementing this part (without being entitled to any additional EU funding
for doing so), unless the Commission expressly relieves them of this obligation.
The financial responsibility of each beneficiary is governed by Articles 44, 45 and 46.
41.2 Internal division of roles and responsibilities
The internal roles and responsibilities of the beneficiaries are divided as follows:
(a) Each beneficiary must:
(i) keep information stored in the Participant Portal Beneficiary Register (via the electronic
exchange system) up to date (see Article 17);
(ii) inform the coordinator immediately of any events or circumstances likely to affect
significantly or delay the implementation of the action (see Article 17);
(iii) submit to the coordinator in good time:
60
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
- individual financial statements for itself and, if required, certificates on the financial
statements (see Article 20);
- the data needed to draw up the technical reports (see Article 20);
- ethics committee opinions and notifications or authorisations for activities raising
ethical issues (see Article 34);
- any other documents or information required by the Commission under the Agreement,
unless the Agreement requires the beneficiary to submit this information directly to the
Commission.
(b) The coordinator must:
(i) monitor that the action is implemented properly (see Article 7);
(ii) act as the intermediary for all communications between the beneficiaries and the
Commission (in particular, providing the Commission with the information described in
Article 17), unless the Agreement specifies otherwise;
(iii) request and review any documents or information required by the Commission and verify
their completeness and correctness before passing them on to the Commission;
(iv) submit the deliverables and reports to the Commission (see Articles 19 and 20);
(v) ensure that all payments are made to the other beneficiaries without unjustified delay (see
Article 21);
(vi) inform the Commission of the amounts paid to each beneficiary, when required under the
Agreement (see Articles 44 and 50) or requested by the Commission.
The coordinator may not delegate or subcontract the above-mentioned tasks to any other
beneficiary or third party (including linked third parties).
As an exception, the coordinator delegates the tasks set out in Point 2(b)(v) and (vi) above
to Fundación Española para la Cooperación Internacional Salud y Política Social, F.S.P.- FCSAI.
The coordinator retains sole responsibility for the EU contribution and for compliance with the
obligations under the Agreement.
41.3 Internal arrangements between beneficiaries — Consortium agreement
The beneficiaries must have internal arrangements regarding their operation and co-ordination to
ensure that the action is implemented properly. These internal arrangements must be set out in a written
‘consortium agreement’ between the beneficiaries, which may cover:
- internal organisation of the consortium;
- management of access to the electronic exchange system;
- distribution of EU funding;
- additional rules on rights and obligations related to background and results (including whether
61
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
access rights remain or not, if a beneficiary is in breach of its obligations) (see Section 3 of
Chapter 4);
- settlement of internal disputes;
- liability, indemnification and confidentiality arrangements between the beneficiaries.
The consortium agreement must not contain any provision contrary to the Agreement.
41.4 Relationship with complementary beneficiaries — Collaboration agreement
Not applicable
41.5 Relationship with partners of a joint action — Coordination agreement
Not applicable
CHAPTER 6 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY
— SANCTIONS — DAMAGES — SUSPENSION — TERMINATION —
FORCE MAJEURE
SECTION 1 REJECTION OF COSTS — REDUCTION OF THE GRANT — RECOVERY
— SANCTIONS
ARTICLE 42 — REJECTION OF INELIGIBLE COSTS
42.1 Conditions
The Commission will — after termination of the participation of a beneficiary, at the payment
of the balance or afterwards — reject any costs which are ineligible (see Article 6), in particular
following checks, reviews, audits or investigations (see Article 22).
The rejection may also be based on the extension of findings from other grants to this grant (see
Article 22.5.2).
42.2 Ineligible costs to be rejected — Calculation — Procedure
Ineligible costs will be rejected in full.
If the rejection of costs does not lead to a recovery (see Article 44), the Commission will formally
notify the coordinator or beneficiary concerned of the rejection of costs, the amounts and the reasons
why (if applicable, together with the notification of amounts due; see Article 21.5). The coordinator
or beneficiary concerned may — within 30 days of receiving notification — formally notify the
Commission of its disagreement and the reasons why.
If the rejection of costs does lead to a recovery, the Commission will follow the contradictory
procedure with ‘pre-information letter’ set out in Article 44.
42.3 Effects
62
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
If the Commission rejects costs after termination of the participation of a beneficiary, it will deduct
them from the costs declared by the beneficiary in the termination report and include the rejection in
the calculation after termination (see Article 50.2 and 50.3).
If the Commission rejects costs at the payment of the balance, it will deduct them from the total
eligible costs declared, for the action, in the summary financial statement (see Article 20.4). It will
then calculate the payment of the balance as set out in Article 21.4.
If the Commission rejects costs after the payment of the balance, it will deduct the amount rejected
from the total eligible costs declared, by the beneficiary, in the final summary financial statement. It
will then calculate the revised final grant amount as set out in Article 5.4.
ARTICLE 43 — REDUCTION OF THE GRANT
43.1 Conditions
The Commission may — after termination of the participation of a beneficiary, at the payment
of the balance or afterwards — reduce the grant, if :
(a) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under the Agreement or during the award procedure
(including improper implementation of the action, submission of false information,
failure to provide requested information, breach of ethical principles) or
(b) a beneficiary (or a natural person who has the power to represent or take decision on its behalf)
has committed — in other EU or Euratom grants awarded to it under similar conditions —
systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a
material impact on this grant (extension of findings from other grants to this grant; see
Article 22.5.2).
43.2 Amount to be reduced — Calculation — Procedure
The amount of the reduction will be proportionate to the seriousness of the errors, irregularities or
fraud or breach of obligations.
Before reduction of the grant, the Commission will formally notify a ‘pre-information letter’ to the
coordinator or beneficiary concerned:
- informing it of its intention to reduce the grant, the amount it intends to reduce and the reasons
why and
- inviting it to submit observations within 30 days of receiving notification
If the Commission does not receive any observations or decides to pursue reduction despite the
observations it has received, it will formally notify confirmation of the reduction (if applicable,
together with the notification of amounts due; see Article 21).
43.3 Effects
63
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
If the Commission reduces the grant after termination of the participation of a beneficiary, it will
calculate the reduced grant amount for that beneficiary and then determine the amount due to that
beneficiary (see Article 50.2 and 50.3).
If the Commission reduces the grant at the payment of the balance, it will calculate the reduced grant
amount for the action and then determine the amount due as payment of the balance (see Articles 5.3.4
and 21.4).
If the Commission reduces the grant after the payment of the balance, it will calculate the revised
final grant amount for the beneficiary concerned (see Article 5.4). If the revised final grant amount
for the beneficiary concerned is lower than its share of the final grant amount, the Commission will
recover the difference (see Article 44).
ARTICLE 44 — RECOVERY OF UNDUE AMOUNTS
44.1 Amount to be recovered — Calculation — Procedure
The Commission will — after termination of the participation of a beneficiary, at the payment
of the balance or afterwards — claim back any amount that was paid but is not due under the
Agreement.
Each beneficiary’s financial responsibility in case of recovery is limited to its own debt, except for
the amount retained for the Guarantee Fund (see Article 21.4).
44.1.1 Recovery after termination of a beneficiary’s participation
If recovery takes place after termination of a beneficiary’s participation (including the coordinator), the
Commission will claim back the undue amount from the beneficiary concerned, by formally notifying
it a debit note (see Article 50.2 and 50.3). This note will specify the amount to be recovered, the terms
and the date for payment.
If payment is not made by the date specified in the debit note, the Commission will recover the
amount:
(a) by ‘offsetting’ it — without the beneficiary’s consent — against any amounts owed to the
beneficiary concerned by the Commission or an executive agency (from the EU or Euratom
budget).
In exceptional circumstances, to safeguard the EU’s financial interests, the Commission may
offset before the payment date specified in the debit note;
(b) Not applicable;
(c) by taking legal action (see Article 57) or by adopting an enforceable decision under Article
299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the Financial
regulation No 966/2012.
If payment is not made by the date specified in the debit note, the amount to be recovered (see above)
will be increased by late-payment interest at the rate set out in Article 21.11, from the day following
the payment date in the debit note, up to and including the date the Commission receives full payment
of the amount.
64
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
Partial payments will be first credited against expenses, charges and late-payment interest and then
against the principal.
Bank charges incurred in the recovery process will be borne by the beneficiary, unless Directive
2007/64/EC24 applies.
44.1.2 Recovery at payment of the balance
If the payment of the balance takes the form of a recovery (see Article 21.4), the Commission will
formally notify a ‘pre-information letter’ to the coordinator:
- informing it of its intention to recover, the amount due as the balance and the reasons why;
- specifying that it intends to deduct the amount to be recovered from the amount retained for
the Guarantee Fund;
- requesting the coordinator to submit a report on the distribution of payments to the beneficiaries
within 30 days of receiving notification, and
- inviting the coordinator to submit observations within 30 days of receiving notification.
If no observations are submitted or the Commission decides to pursue recovery despite the
observations it has received, it will confirm recovery (together with the notification of amounts due;
see Article 21.5) and:
- pay the difference between the amount to be recovered and the amount retained for the
Guarantee Fund, if the difference is positive or
- formally notify to the coordinator a debit note for the difference between the amount to be
recovered and the amount retained for the Guarantee Fund, if the difference is negative. This
note will also specify the terms and the date for payment.
If the coordinator does not repay the Commission by the date in the debit note and has not submitted
the report on the distribution of payments: the Commission will recover the amount set out in the
debit note from the coordinator (see below).
If the coordinator does not repay the Commission by the date in the debit note, but has submitted the
report on the distribution of payments: the Commission will:
(a) identify the beneficiaries for which the amount calculated as follows is negative:
{{{{beneficiary’s costs declared in the final summary financial statement and approved by the
Commission multiplied by the reimbursement rate set out in Article 5.2 for the beneficiary concerned}
divided by
the EU contribution for the action calculated according to Article 5.3.1}
multiplied by
the final grant amount (see Article 5.3)},
24 Directive 2007/64/EC of the European Parliament and of the Council of 13 November 2007 on payment services in
the internal market amending Directives 97/7/EC, 2002/65/EC, 2005/60/EC and 2006/48/EC and repealing Directive
97/5/EC (OJ L 319, 05.12.2007, p. 1).
65
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
minus
}
pre-financing received by the beneficiary .
(b) formally notify to each beneficiary identified according to point (a) a debit note specifying the
terms and date for payment. The amount of the debit note is calculated as follows:
{{amount calculated according to point (a) for the beneficiary concerned
divided by
the sum of the amounts calculated according to point (a) for all the beneficiaries identified according to
point (a)}
multiplied by
the amount set out in the debit note formally notified to the coordinator}.
If payment is not made by the date specified in the debit note, the Commission will recover the
amount:
(a) by ‘offsetting’ it — without the beneficiary’s consent — against any amounts owed to the
beneficiary concerned by the Commission or an executive agency (from the EU or Euratom
budget).
In exceptional circumstances, to safeguard the EU’s financial interests, the Commission may
offset before the payment date specified in the debit note;
(b) by drawing on the Guarantee Fund. The Commission will formally notify the beneficiary
concerned the debit note on behalf of the Guarantee Fund and recover the amount:
(i) not applicable;
(ii) by taking legal action (see Article 57) or by adopting an enforceable decision under
Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of
the Financial Regulation No 966/2012.
If payment is not made by the date in the debit note, the amount to be recovered (see above) will be
increased by late-payment interest at the rate set out in Article 21.11, from the day following the
payment date in the debit note, up to and including the date the Commission receives full payment
of the amount.
Partial payments will be first credited against expenses, charges and late-payment interest and then
against the principal.
Bank charges incurred in the recovery process will be borne by the beneficiary, unless
Directive 2007/64/EC applies.
44.1.3 Recovery of amounts after payment of the balance
If, for a beneficiary, the revised final grant amount (see Article 5.4) is lower than its share of the final
grant amount, it must repay the difference to the Commission.
The beneficiary’s share of the final grant amount is calculated as follows:
66
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
{{{beneficiary’s costs declared in the final summary financial statement and approved by the Commission
multiplied by the reimbursement rate set out in Article 5.2 for the beneficiary concerned}
divided by
the EU contribution for the action calculated according to Article 5.3.1}
multiplied by
the final grant amount (see Article 5.3)}.
If the coordinator has not distributed amounts received (see Article 21.7), the Commission will also
recover these amounts.
The Commission will formally notify a pre-information letter to the beneficiary concerned:
- informing it of its intention to recover, the due amount and the reasons why and
- inviting it to submit observations within 30 days of receiving notification.
If no observations are submitted or the Commission decides to pursue recovery despite the
observations it has received, it will confirm the amount to be recovered and formally notify to the
beneficiary concerned a debit note. This note will also specify the terms and the date for payment.
If payment is not made by the date specified in the debit note, the Commission will recover the
amount:
(a) by ‘offsetting’ it — without the beneficiary’s consent — against any amounts owed to the
beneficiary concerned by the Commission or an executive agency (from the EU or Euratom
budget).
In exceptional circumstances, to safeguard the EU’s financial interests, the Commission may
offset before the payment date specified in the debit note;
(b) by drawing on the Guarantee Fund. The Commission will formally notify the beneficiary
concerned the debit note on behalf of the Guarantee Fund and recover the amount:
(i) not applicable;
(ii) by taking legal action (see Article 57) or by adopting an enforceable decision under
Article 299 of the Treaty on the Functioning of the EU (TFEU) and Article 79(2) of the
Financial Regulation No 966/2012.
If payment is not made by the date in the debit note, the amount to be recovered (see above) will
be increased by late-payment interest at the rate set out in Article 21.11, from the day following
the date for payment in the debit note, up to and including the date the Commission receives full
payment of the amount.
Partial payments will be first credited against expenses, charges and late-payment interest and then
against the principal.
Bank charges incurred in the recovery process will be borne by the beneficiary, unless
Directive 2007/64/EC applies.
67
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
ARTICLE 45 — ADMINISTRATIVE SANCTIONS
In addition to contractual measures, the Commission may also adopt administrative sanctions under
Articles 106 and 131(4) of the Financial Regulation No 966/2012 (i.e. exclusion from future
procurement contracts, grants and expert contracts and/or financial penalties).
SECTION 2 LIABILITY FOR DAMAGES
ARTICLE 46 — LIABILITY FOR DAMAGES
46.1 Liability of the Commission
The Commission cannot be held liable for any damage caused to the beneficiaries or to third parties
as a consequence of implementing the Agreement, including for gross negligence.
The Commission cannot be held liable for any damage caused by any of the beneficiaries or third
parties involved in the action, as a consequence of implementing the Agreement.
46.2 Liability of the beneficiaries
Except in case of force majeure (see Article 51), the beneficiaries must compensate the Commission
for any damage it sustains as a result of the implementation of the action or because the action was
not implemented in full compliance with the Agreement.
SECTION 3 SUSPENSION AND TERMINATION
ARTICLE 47 — SUSPENSION OF PAYMENT DEADLINE
47.1 Conditions
The Commission may — at any moment — suspend the payment deadline (see Article 21.2 to 21.4)
if a request for payment (see Article 20) cannot be approved because:
(a) it does not comply with the provisions of the Agreement (see Article 20);
(b) the technical or financial reports have not been submitted or are not complete or additional
information is needed, or
(c) there is doubt about the eligibility of the costs declared in the financial statements and additional
checks, reviews, audits or investigations are necessary.
47.2 Procedure
The Commission will formally notify the coordinator of the suspension and the reasons why.
The suspension will take effect the day notification is sent by the Commission (see Article 52).
If the conditions for suspending the payment deadline are no longer met, the suspension will be lifted
— and the remaining period will resume.
68
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
If the suspension exceeds two months, the coordinator may request the Commission if the suspension
will continue.
If the payment deadline has been suspended due to the non-compliance of the technical or financial
reports (see Article 20) and the revised report or statement is not submitted or was submitted but is also
rejected, the Commission may also terminate the Agreement or the participation of the beneficiary
(see Article 50.3.1(l)).
ARTICLE 48 — SUSPENSION OF PAYMENTS
48.1 Conditions
The Commission may — at any moment — suspend payments, in whole or in part and for one or
more beneficiaries, if:
(a) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed or is suspected of having committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under the Agreement or during the award procedure
(including improper implementation of the action, submission of false information,
failure to provide requested information, breach of ethical principles) or
(b) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed — in other EU or Euratom grants awarded to it under similar conditions —
systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a
material impact on this grant (extension of findings from other grants to this grant; see
Article 22.5.2).
If payments are suspended for one or more beneficiaries, the Commission will make partial payment(s)
for the part(s) not suspended. If suspension concerns the payment of the balance, — once suspension
is lifted — the payment or the recovery of the amount(s) concerned will be considered the payment
of the balance that closes the action.
48.2 Procedure
Before suspending payments, the Commission will formally notify the coordinator or beneficiary
concerned:
- informing it of its intention to suspend payments and the reasons why and
- inviting it to submit observations within 30 days of receiving notification.
If the Commission does not receive observations or decides to pursue the procedure despite the
observations it has received, it will formally notify confirmation of the suspension. Otherwise, it will
formally notify that the suspension procedure is not continued.
The suspension will take effect the day the confirmation notification is sent by the Commission.
If the conditions for resuming payments are met, the suspension will be lifted. The Commission will
formally notify the coordinator or beneficiary concerned.
69
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
The beneficiaries may suspend implementation of the action (see Article 49.1) or terminate the
Agreement or the participation of the beneficiary concerned (see Article 50.1 and 50.2).
ARTICLE 49 — SUSPENSION OF THE ACTION IMPLEMENTATION
49.1 Suspension of the action implementation, by the beneficiaries
49.1.1 Conditions
The beneficiaries may suspend implementation of the action or any part of it, if exceptional
circumstances — in particular force majeure (see Article 51) — make implementation impossible or
excessively difficult.
49.1.2 Procedure
The coordinator must immediately formally notify to the Commission the suspension (see Article 52),
stating:
- the reasons why and
- the expected date of resumption.
The suspension will take effect the day this notification is received by the Commission.
Once circumstances allow for implementation to resume, the coordinator must immediately formally
notify the Commission and request an amendment of the Agreement to set the date on which the
action will be resumed, extend the duration of the action and make other changes necessary to adapt
the action to the new situation (see Article 55) — unless the Agreement or the participation of a
beneficiary has been terminated (see Article 50).
The suspension will be lifted with effect from the resumption date set out in the amendment. This
date may be before the date on which the amendment enters into force.
Costs incurred during suspension of the action implementation are not eligible (see Article 6).
49.2 Suspension of the action implementation, by the Commission
49.2.1 Conditions
The Commission may suspend implementation of the action or any part of it, if:
(a) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed or is suspected of having committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under the Agreement or during the award procedure
(including improper implementation of the action, submission of false information,
failure to provide requested information, breach of ethical principles);
(b) a beneficiary (or a natural person who has the power to represent or take decisions on its behalf)
has committed — in other EU or Euratom grants awarded to it under similar conditions —
70
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a
material impact on this grant (extension of findings from other grants to this grant; see
Article 22.5.2), or
(c) the action is suspected of having lost its scientific or technological relevance.
49.2.2 Procedure
Before suspending implementation of the action, the Commission will formally notify the coordinator
or beneficiary concerned:
- informing it of its intention to suspend the implementation and the reasons why and
- inviting it to submit observations within 30 days of receiving notification.
If the Commission does not receive observations or decides to pursue the procedure despite the
observations it has received, it will formally notify confirmation of the suspension. Otherwise, it will
formally notify that the procedure is not continued.
The suspension will take effect five days after confirmation notification is received (or on a later date
specified in the notification).
It will be lifted if the conditions for resuming implementation of the action are met.
The coordinator or beneficiary concerned will be formally notified of the lifting and the Agreement
will be amended to set the date on which the action will be resumed, extend the duration of the action
and make other changes necessary to adapt the action to the new situation (see Article 55) — unless
the Agreement has already been terminated (see Article 50).
The suspension will be lifted with effect from the resumption date set out in the amendment. This date
may be before the date on which the amendment enters into force.
Costs incurred during suspension are not eligible (see Article 6).
The beneficiaries may not claim damages due to suspension by the Commission (see Article 46).
Suspension of the action implementation does not affect the Commission’s right to terminate the
Agreement or participation of a beneficiary (see Article 50), reduce the grant or recover amounts
unduly paid (see Articles 43 and 44).
ARTICLE 50 — TERMINATION OF THE AGREEMENT OR OF THE PARTICIPATION
OF ONE OR MORE BENEFICIARIES
50.1 Termination of the Agreement, by the beneficiaries
50.1.1 Conditions and procedure
The beneficiaries may terminate the Agreement.
The coordinator must formally notify termination to the Commission (see Article 52), stating:
- the reasons why and
71
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
- the date the termination will take effect. This date must be after the notification.
If no reasons are given or if the Commission considers the reasons do not justify termination, the
Agreement will be considered to have been ‘terminated improperly’.
The termination will take effect on the day specified in the notification.
50.1.2 Effects
The coordinator must — within 60 days from when termination takes effect — submit the final report
(see Article 20.4).
If the Commission does not receive the report within the deadline (see above), no costs will be taken
into account.
The Commission will calculate the final grant amount (see Article 5.3) and the balance (see
Article 21.4) on the basis of the report submitted. Only costs incurred until termination are eligible
(see Article 6). Costs relating to contracts due for execution only after termination are not eligible.
Improper termination may lead to a reduction of the grant (see Article 43).
After termination, the beneficiaries’ obligations (in particular Articles 20, 22, 23, Section 3 of
Chapter 4, 36, 37, 38, 40, 42, 43 and 44) continue to apply.
50.2 Termination of the participation of one or more beneficiaries, by the beneficiaries
50.2.1 Conditions and procedure
The participation of one or more beneficiaries may be terminated by the coordinator, on request of
the beneficiary concerned or on behalf of the other beneficiaries.
The coordinator must formally notify termination to the Commission (see Article 52) and inform the
beneficiary concerned.
If the coordinator’s participation is terminated without its agreement, the formal notification must be
done by another beneficiary (acting on behalf of the other beneficiaries).
The notification must include:
- the reasons why;
- the opinion of the beneficiary concerned (or proof that this opinion has been requested in
writing);
- the date the termination takes effect. This date must be after the notification, and
- a request for amendment (see Article 55), with a proposal for reallocation of the tasks and the
estimated budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary, the
addition of one or more new beneficiaries (see Article 56). If termination takes effect after the
period set out in Article 3, no request for amendment must be included unless the beneficiary
concerned is the coordinator. In this case, the request for amendment must propose a new
coordinator.
72
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
If this information is not given or if the Commission considers that the reasons do not justify
termination, the participation will be considered to have been terminated improperly.
The termination will take effect on the day specified in the notification.
50.2.2 Effects
The coordinator must — within 30 days from when termination takes effect — submit:
(i) a report on the distribution of payments to the beneficiary concerned and
(ii) if termination takes effect during the period set out in Article 3, a ‘termination report’ from the
beneficiary concerned, for all the reporting periods until termination, containing an overview of
the progress of the work, an overview of the use of resources, the individual financial statement
and, if applicable, the certificate on the financial statement (see Article 20.2a and 20.4).
The information in the termination report must also be included in the final report (see Article 20.4).
If the request for amendment is rejected by the Commission, (because it calls into question the decision
awarding the grant or breaches the principle of equal treatment of applicants), the Agreement may be
terminated according to Article 50.3.1(c).
If the request for amendment is accepted by the Commission, the Agreement is amended to introduce
the necessary changes (see Article 55).
The Commission will — on the basis of the the termination report and the report on the distribution of
payments — calculate the amount which is due to the beneficiary and if the pre-financing payments
received by the beneficiary exceed this amount.
The amount which is due is calculated in the following steps:
Step 1 — Application of the reimbursement rate to the eligible costs
The grant amount for the beneficiary is calculated by applying the reimbursement
rate(s) to the total eligible costs declared by the beneficiary in the termination report
and approved by the Commission.
Only costs incurred by the beneficiary concerned until termination takes effect are
eligible (see Article 6). Costs relating to contracts due for execution only after
termination are not eligible.
Step 2 — Reduction due to substantial errors, irregularities or fraud or serious breach of
obligations
In case of a reduction (see Article 43), the Commission will calculate the reduced
grant amount for the beneficiary by deducting the amount of the reduction (calculated
in proportion to the seriousness of the errors, irregularities or fraud or breach
of obligations, in accordance with Article 43.2) from the grant amount for the
beneficiary.
If the payments received exceed the amounts due:
- if termination takes effect during the period set out in Article 3 and the request for
73
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
amendment is accepted, the beneficiary concerned must repay to the coordinator the amount
unduly received. The Commission will formally notify the amount unduly received and
request the beneficiary concerned to repay it to the coordinator within 30 days of receiving
notification. If it does not repay the coordinator, the Commission will draw upon the
Guarantee Fund to pay the coordinator and then notify a debit note on behalf of the
Guarantee Fund to the beneficiary concerned (see Article 44);
- in all other cases (in particular if termination takes effect after the period set out in Article 3),
the Commission will formally notify a debit note to the beneficiary concerned. If payment
is not made by the date in the debit note, the Guarantee Fund will pay to the Commission the
amount due and the Commission will notify a debit note on behalf of the Guarantee Fund
to the beneficiary concerned (see Article 44);
If the payments received do not exceed the amounts due: amounts owed to the beneficiary
concerned will be included in the final payment.
If the Commission does not receive the termination report within the deadline (see above), no costs
will be taken into account.
If the Commission does not receive the report on the distribution of payments within the deadline (see
above), it will consider that:
- the coordinator did not distribute any payment to the beneficiary concerned and that
- the beneficiary concerned must not repay any amount to the coordinator.
Improper termination may lead to a reduction of the grant (see Article 43) or termination of the
Agreement (see Article 50).
After termination, the concerned beneficiary’s obligations (in particular Articles 20, 22, 23, Section 3
of Chapter 4, 36, 37, 38, 40, 42, 43 and 44) continue to apply.
50.3 Termination of the Agreement or of the participation of one or more beneficiaries, by the
Commission
50.3.1 Conditions
The Commission may terminate the Agreement or the participation of one or more beneficiaries, if:
(a) one or more beneficiaries do not accede to the Agreement (see Article 56);
(b) a change to their legal, financial, technical, organisational or ownership situation is likely to
substantially affect or delay the implementation of the action or calls into question the decision
to award the grant;
(c) following termination of participation for one or more beneficiaries (see above), the necessary
changes to the Agreement would call into question the decision awarding the grant or breach
the principle of equal treatment of applicants (see Article 55);
(d) implementation of the action is prevented by force majeure (see Article 51) or suspended by
the coordinator (see Article 49.1) and either:
74
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
(i) resumption is impossible, or
(ii) the necessary changes to the Agreement would call into question the decision awarding
the grant or breach the principle of equal treatment of applicants;
(e) a beneficiary is declared bankrupt, being wound up, having its affairs administered by the
courts, has entered into an arrangement with creditors, has suspended business activities, or
is subject to any other similar proceedings or procedures under national law;
(f) a beneficiary (or a natural person who has the power to represent or take decisions on its
behalf) has been found guilty of professional misconduct, proven by any means;
(g) a beneficiary does not comply with the applicable national law on taxes and social security;
(h) the action has lost scientific or technological relevance;
(i) not applicable;
(j) not applicable;
(k) a beneficiary (or a natural person who has the power to represent or take decisions on its
behalf) has committed fraud, corruption, or is involved in a criminal organisation, money
laundering or any other illegal activity;
(l) a beneficiary (or a natural person who has the power to represent or take decisions on its
behalf) has committed:
(i) substantial errors, irregularities or fraud or
(ii) serious breach of obligations under the Agreement or during the award procedure
(including improper implementation of the action, submission of false information,
failure to provide required information, breach of ethical principles);
(m) a beneficiary (or a natural person who has the power to represent or take decisions on its
behalf) has committed — in other EU or Euratom grants awarded to it under similar conditions
— systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have
a material impact on this grant (extension of findings from other grants to this grant; see
Article 22.5.2);
(n) despite a specific request by the Commission, a beneficiary does not request — through the
coordinator — an amendment to the Agreement to end the participation of one if its linked
third parties that is in one of the situations under points (e), (f), (g), (k), (l) or (m) and to
reallocate its tasks.
50.3.2 Procedure
Before terminating the Agreement or participation of one or more beneficiaries, the Commission will
formally notify the coordinator or beneficiary concerned:
- informing it of its intention to terminate and the reasons why and
- inviting it, within 30 days of receiving notification, to submit observations and — in case of
75
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
Point (l.ii) above — to inform the Commission of the measures to ensure compliance with the
obligations under the Agreement.
If the Commission does not receive observations or decides to pursue the procedure despite
the observations it has received, it will formally notify to the coordinator or beneficiary
concerned confirmation of the termination and the date it will take effect. Otherwise, it will formally
notify that the procedure is not continued.
The termination will take effect:
- for terminations under Points (b), (c), (e), (g), (h), (j), (l.ii) and (n) above: on the day specified
in the notification of the confirmation (see above);
- for terminations under Points (a), (d), (f), (i), (k), (l.i) and (m) above: on the day after the
notification of the confirmation is received.
50.3.3 Effects
(a) for termination of the Agreement:
The coordinator must — within 60 days from when termination takes effect — submit a final
report (see Article 20.4).
If the Agreement is terminated for breach of the obligation to submit reports (see Articles 20.8
and 50.3.1(l)), the coordinator may not submit any reports after termination.
If the Commission does not receive the report within the deadline (see above), no costs will be
taken into account.
The Commission will calculate the final grant amount (see Article 5.3) and the balance (see
Article 21.4) on the basis of the reports submitted. Only costs incurred until termination takes
effect are eligible (see Article 6). Costs relating to contracts due for execution only after
termination are not eligible.
This does not affect the Commission’s right to reduce the grant (see Article 43) or to impose
administrative sanctions (Article 45).
The beneficiaries may not claim damages due to termination by the Commission (see Article 46).
After termination, the beneficiaries’ obligations (in particular Articles 20, 22, 23, Section 3 of
Chapter 4, 36, 37, 38, 40, 42, 43 and 44) continue to apply.
(b) for termination of the participation of one or more beneficiaries:
The coordinator must — within 60 days from when termination takes effect — submit:
(i) a report on the distribution of payments to the beneficiary concerned;
(ii) a request for amendment (see Article 55), with a proposal for reallocation of the tasks and
estimated budget of the beneficiary concerned (see Annexes 1 and 2) and, if necessary,
the addition of one or more new beneficiaries (see Article 56). If termination is notified
after the period set out in Article 3, no request for amendment must be submitted unless
76
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
the beneficiary concerned is the coordinator. In this case the request for amendment must
propose a new coordinator, and
(iii) if termination takes effect during the period set out in Article 3, a termination report
from the beneficiary concerned, for all the reporting periods until termination, containing
an overview of the progress of the work, an overview of the use of resources, the individual
financial statement and, if applicable, the certificate on the financial statement (see Article
20).
The information in the termination report must also be included in the final report (see
Article 20.4).
If the request for amendment is rejected by the Commission (because it calls into question
the decision awarding the grant or breaches the principle of equal treatment of applicants), the
Agreement may be terminated according to Article 50.3.1(c).
If the request for amendment is accepted by the Commission, the Agreement is amended to
introduce the necessary changes (see Article 55).
The Commission will — on the basis of the termination report and the report on the distribution
of payments — calculate the amount which is due to the beneficiary and if the pre-financing
payments received by the beneficiary exceed this amount.
The amount which is due is calculated in the following steps:
Step 1 — Application of the reimbursement rate to the eligible costs
The grant amount for the beneficiary is calculated by applying the reimbursement
rate(s) to the total eligible costs declared by the beneficiary in the termination
report and approved by the Commission.
Only costs incurred by the beneficiary concerned until termination takes effect
are eligible (see Article 6). Costs relating to contracts due for execution only after
termination are not eligible.
Step 2 — Reduction due to substantial errors, irregularities or fraud or serious breach of
obligations
In case of a reduction (see Article 43), the Commission will calculate the reduced
grant amount for the beneficiary by deducting the amount of the reduction
(calculated in proportion to the seriousness of the errors, irregularities or fraud
or breach of obligations, in accordance with Article 43.2) from the grant amount
for the beneficiary.
If the payments received exceed the amounts due:
- if termination takes effect during the period set out in Article 3 and the request for
amendment is accepted, the beneficiary concerned must repay to the coordinator the
amount unduly received. The Commission will formally notify the amount unduly
received and request the beneficiary concerned to repay it to the coordinator within 30
days of receiving notification. If it does not repay the coordinator, the Commission will
draw upon the Guarantee Fund to pay the coordinator and then notify a debit note on
behalf of the Guarantee Fund to the beneficiary concerned (see Article 44);
77
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
- in all other cases (in particular if termination takes effect after the period set out in Article
3), the Commission will formally notify a debit note to the beneficiary concerned. If
payment is not made by the date in the debit note, the Guarantee Fund will pay to the
Commission the amount due and the Commission will notify a debit note on behalf of
the Guarantee Fund to the beneficiary concerned (see Article 44);
If the payments received do not exceed the amounts due: amounts owed to the beneficiary
concerned will be included in the final payment.
If the Commission does not receive the termination report within the deadline (see above), no
costs will be taken into account.
If the Commission does not receive the report on the distribution of payments within the deadline
(see above), it will consider that:
- the coordinator did not distribute any payment to the beneficiary concerned and that
- the beneficiary concerned must not repay any amount to the coordinator.
After termination, the concerned beneficiary’s obligations (in particular Articles 20, 22, 23,
Section 3 of Chapter 4, 36, 37, 38, 40, 42, 43 and 44) continue to apply.
SECTION 4 FORCE MAJEURE
ARTICLE 51 — FORCE MAJEURE
‘Force majeure’ means any situation or event that:
- prevents either party from fulfilling their obligations under the Agreement,
- was unforeseeable, exceptional situation and beyond the parties’ control,
- was not due to error or negligence on their part (or on the part of third parties involved in the
action), and
- proves to be inevitable in spite of exercising all due diligence.
The following cannot be invoked as force majeure:
- any default of a service, defect in equipment or material or delays in making them available,
unless they stem directly from a relevant case of force majeure,
- labour disputes or strikes, or
- financial difficulties.
Any situation constituting force majeure must be formally notified to the other party without delay,
stating the nature, likely duration and foreseeable effects.
The parties must immediately take all the necessary steps to limit any damage due to force majeure
and do their best to resume implementation of the action as soon as possible.
78
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
The party prevented by force majeure from fulfilling its obligations under the Agreement cannot be
considered in breach of them.
CHAPTER 7 FINAL PROVISIONS
ARTICLE 52 — COMMUNICATION BETWEEN THE PARTIES
52.1 Form and means of communication
Communication under the Agreement (information, requests, submissions, ‘formal notifications’, etc.)
must:
- be made in writing and
- bear the number of the Agreement.
Until the payment of the balance: all communication must be made through the electronic exchange
system and using the forms and templates provided there.
After the payment of the balance: formal notifications must be made by registered post with proof
of delivery (‘formal notification on paper’).
Communications in the electronic exchange system must be made by persons authorised according to
the Participant Portal Terms & Conditions. For naming the authorised persons, each beneficiary must
have designated — before the signature of this Agreement — a ‘legal entity appointed representative
(LEAR)’. The role and tasks of the LEAR are stipulated in his/her appointment letter (see Participant
Portal Terms & Conditions).
If the electronic exchange system is temporarily unavailable, instructions will be given on the
Commission websites.
52.2 Date of communication
Communications are considered to have been made when they are sent by the sending party (i.e. on
the date and time they are sent through the electronic exchange system).
Formal notifications through the electronic exchange system are considered to have been made when
they are received by the receiving party (i.e. on the date and time of acceptance by the receiving party,
as indicated by the time stamp). A formal notification that has not been accepted within 10 days after
sending is considered to have been accepted.
Formal notifications on paper sent by registered post with proof of delivery (only after the payment
of the balance) are considered to have been made on either:
- the delivery date registered by the postal service or
- the deadline for collection at the post office.
If the electronic exchange system is temporarily unavailable, the sending party cannot be considered
in breach of its obligation to send a communication within a specified deadline.
79
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
52.3 Addresses for communication
The electronic exchange system must be accessed via the following URL:
https://ec.europa.eu/research/participants/portal/desktop/en/projects/
The Commission will formally notify the coordinator and beneficiaries in advance any changes to
this URL.
Formal notifications on paper (only after the payment of the balance) addressed to the Commission
must be sent to the following address:
European Commission
DIRECTORATE-GENERAL RESEARCH & INNOVATION
Innovative and Personalised Medicine
Directorate Health
B-1049 Brussels Belgium
Formal notifications on paper (only after the payment of the balance) addressed to the beneficiaries
must be sent to their legal address as specified in the Participant Portal Beneficiary Register.
ARTICLE 53 — INTERPRETATION OF THE AGREEMENT
53.1 Precedence of the Terms and Conditions over the Annexes
The provisions in the Terms and Conditions of the Agreement take precedence over its Annexes.
Annex 2 takes precedence over Annex 1.
53.2 Privileges and immunities
Not applicable
ARTICLE 54 — CALCULATION OF PERIODS, DATES AND DEADLINES
In accordance with Regulation No 1182/7125, periods expressed in days, months or years are calculated
from the moment the triggering event occurs.
The day during which that event occurs is not considered as falling within the period.
ARTICLE 55 — AMENDMENTS TO THE AGREEMENT
55.1 Conditions
The Agreement may be amended, unless the amendment entails changes to the Agreement which
would call into question the decision awarding the grant or breach the principle of equal treatment
of applicants.
Amendments may be requested by any of the parties.
25 Regulation (EEC, Euratom) No 1182/71 of the Council of 3 June 1971 determining the rules applicable to periods,
dates and time-limits (OJ L 124, 8.6.1971, p. 1).
80
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
55.2 Procedure
The party requesting an amendment must submit a request for amendment signed in the electronic
exchange system (see Article 52).
The coordinator submits and receives requests for amendment on behalf of the beneficiaries (see
Annex 3).
If a change of coordinator is requested without its agreement, the submission must be done by another
beneficiary (acting on behalf of the other beneficiaries).
The request for amendment must include:
- the reasons why;
- the appropriate supporting documents;
- for a change of coordinator without its agreement: the opinion of the coordinator (or proof that
this opinion has been requested in writing).
The Commission may request additional information.
If the party receiving the request agrees, it must sign the amendment in the electronic exchange system
within 45 days of receiving notification (or any additional information the Commission has requested).
If it does not agree, it must formally notify its disagreement within the same deadline. The deadline
may be extended, if necessary for the assessment of the request. If no notification is received within
the deadline, the request is considered to have been rejected
An amendment enters into force on the day of the signature of the receiving party.
An amendment takes effect on the date agreed by the parties or, in the absence of such an agreement,
on the date on which the amendment enters into force.
ARTICLE 56 — ACCESSION TO THE AGREEMENT
56.1 Accession of the beneficiaries mentioned in the Preamble
The other beneficiaries must accede to the Agreement by signing the Accession Form (see Annex 3) in
the electronic exchange system (see Article 52) within 30 days after its entry into force (see Article 58).
They will assume the rights and obligations under the Agreement with effect from the date of its entry
into force (see Article 58).
If a beneficiary does not accede to the Agreement within the above deadline, the coordinator must
— within 30 days — request an amendment to make any changes necessary to ensure proper
implementation of the action. This does not affect the Commission’s right to terminate the Agreement
(see Article 50).
56.2 Addition of new beneficiaries
In justified cases, the beneficiaries may request the addition of a new beneficiary.
81
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
For this purpose, the coordinator must submit a request for amendment in accordance with Article 55.
It must include an Accession Form (see Annex 3) signed by the new beneficiary in the electronic
exchange system (see Article 52).
New beneficiaries must assume the rights and obligations under the Agreement with effect from the
date of their accession specified in the Accession Form (see Annex 3).
ARTICLE 57 — APPLICABLE LAW AND SETTLEMENT OF DISPUTES
57.1 Applicable law
The Agreement is governed by the applicable EU law, supplemented if necessary by the law of
Belgium.
57.2 Dispute settlement
If a dispute concerning the interpretation, application or validity of the Agreement cannot be settled
amicably, the General Court — or, on appeal, the Court of Justice of the European Union — has sole
jurisdiction. Such actions must be brought under Article 272 of the Treaty on the Functioning of the
EU (TFEU).
As an exception, if such a dispute is between the Commission and CANADIAN INSTITUTES
OF HEALTH RESEARCH, FONDS DE RECHERCHE DU QUEBEC - SANTE, MINISTRY
OF HEALTH, NORGES FORSKNINGSRAD, TURKIYE BILIMSEL VE TEKNOLOJIK
ARASTIRMA KURUMU, the competent Belgian courts have sole jurisdiction.
If a dispute concerns administrative sanctions, offsetting or an enforceable decision under Article 299
TFEU (see Articles 44, 45 and 46), the beneficiaries must bring action before the General Court —
or, on appeal, the Court of Justice of the European Union — under Article 263 TFEU.
82
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
H2020
Associated withMGA ERA-NET
document Cofund — Multi:-v3.0
Ref. Ares(2017)5690678 21/11/2017
ARTICLE 58 — ENTRY INTO FORCE OF THE AGREEMENT
The Agreement will enter into force on the day of signature by the Commission or the coordinator,
depending on which is later.
SIGNATURES
For the coordinator For the Commission
[--TGSMark#signature-999507886_75_210--] [--TGSMark#signature-service_75_210--]
JESUS F.CRESPO with ECAS id narenjoa signed in the Signed by Mila BAS SANCHEZ with ECAS id bassami as
Participant Portal on 04/12/2017 at 14:56:14 (transaction id an authorised representative on 05-12-2017 17:19:29
SigId-14894- (transaction id SigId-44128-
ZKiCCNgM5i9DyefapvbMwVzLiWdd5wzQhk8vCMa2B5zr DogeJAzs5kI2KOyyWi8CSo7ZHdRCzkgDCkkLYgWWKZ1
W0N78WHUxRtcxJB6dbzddFwttmdOvGcn6EYiesHbzWE- k6ZwJ2NocYL0nHzUQkaQECDMNAEnTqEXn4lsuzys2Ee
Jj71zxYb8yrNhG1ZJUpYxu- G-Jj71zxYb8yrNhG1ZJUpYxu-
0hKBFT8xJUXPBR6OXaXA6Yxct6UJsKaCAPaurztjCzIm). tVCKbX1iBXxewUE7TiXCvtqQNdEtsEze0zhzglZSudUS)
Timestamp by third party at Tue Dec 05 17:19:34 CET 2017
Mon Dec 04 14:56:32 CET 2017
83
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
EUROPEAN COMMISSION
DIRECTORATE-GENERAL RESEARCH & INNOVATION
Innovative and Personalised Medicine
ANNEX 1 (part A)
ERA-NET Cofund
NUMBER — 779282 — ERA PerMed
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Table of Contents
1.1. The project summary................................................................................................................................. 3
1.2. The list of beneficiaries..............................................................................................................................4
1.3. Workplan Tables - Detailed implementation..............................................................................................6
1.3.1. WT1 List of work packages........................................................................................................... 6
1.3.2. WT2 List of deliverables................................................................................................................ 7
1.3.3. WT3 Work package descriptions................................................................................................. 10
Work package 1......................................................................................................................... 10
Work package 2......................................................................................................................... 13
Work package 3......................................................................................................................... 16
Work package 4......................................................................................................................... 21
Work package 5......................................................................................................................... 24
Work package 6......................................................................................................................... 27
Work package 7......................................................................................................................... 31
1.3.4. WT4 List of milestones................................................................................................................ 34
1.3.5. WT5 Critical Implementation risks and mitigation actions........................................................... 35
1.3.6 WT6 Summary of project effort contribution.................................................................................37
1.3.7. WT7 Tentative schedule of project reviews.................................................................................39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
1.1. The project summary
Project Number 1 779282 Project Acronym 2 ERA PerMed
One form per project
General information
Project title 3
ERA-Net Cofund in Personalised Medicine
Starting date 4 01/12/2017
Duration in months 5 60
Call (part) identifier 6 H2020-SC1-2017-Single-Stage-RTD
SC1-HCO-03-2017
Topic
Implementing the Strategic Research Agenda on Personalised Medicine
Fixed EC Keywords Personalised medicine
Free keywords Joint transnational calls, Funding agencies, Alignment, R&I Perfoming Organisations
Abstract 7
ERA PerMed will serve as a funding vehicle of topics identified in the Strategic Research and Innovation Agenda
(SRIA) in Personalised Medicine and the Action Plan of ICPerMed.
ERA PerMed will coordinate R&I efforts of the participating partners (funding agencies from EU, associate countries
to H2020 and third countries). The main objective is planning, implementing, monitoring and disseminate up to
four joint transnational calls (JTCs) tackling the value change in full to fund multidisciplinary transnational research
projects covering each at least three slots of the value chain regarding Personalised Medicine.
The ERA PerMed consortium is open to enlargement for the planned JTCs. According to funding scheme’s rules,
ERA PerMed partners commit themselves to implement one call with top-up co-funding from the EC, and include
funded project monitoring. Additionally, up to three non-cofunded calls will be carried, in order to broaden the scope
of action of the efforts made by the EC and funding organizations to foster the Personalised Medicine Research
Community and to be able to take into account recent changes within the landscape of personalised medicine, e.g. new
developments of emerging technologies and societal challenges, which reinforces and amplifies the expected impact
of ERA PerMed funding activity.
Cooperation and links with ICPerMed and a dialogue with patient organisations, other European stakeholders and
initiatives are crucial for both R&I and the implementation of their results and sustainability, which reinforces and
amplifies the expected impact of ERA PerMed funding activity.
Page 3 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
1.2. List of Beneficiaries
Project Number 1 779282 Project Acronym 2 ERA PerMed
List of Beneficiaries
Project Project
No Name Short name Country entry exit
month8 month
1 INSTITUTO DE SALUD CARLOS III ISCIII Spain 1 60
FONDS ZUR FÖRDERUNG DER
2 FWF Austria 1 60
WISSENSCHAFTLICHEN FORSCHUNG
CANADIAN INSTITUTES OF HEALTH
3 CIHR Canada 1 60
RESEARCH
FONDS DE RECHERCHE DU QUEBEC -
4 FRQS (Quebec) Canada 1 60
SANTE
MINISTARSTVO ZNANOSTI I
5 MZOS Croatia 1 60
OBRAZOVANJA
6 INNOVATIONSFONDEN InnoFond Denmark 1 60
SIHTASUTUS EESTI
7 ETAg Estonia 1 60
TEADUSAGENTUUR
8 SOTSIAALMINISTEERIUM MSAE Estonia 1 60
9 SUOMEN AKATEMIA AKA Finland 1 60
AGENCE NATIONALE DE LA
10 ANR France 1 60
RECHERCHE
BUNDESMINISTERIUM FUER BILDUNG
11 BMBF Germany 1 60
UND FORSCHUNG
DEUTSCHES ZENTRUM FUER LUFT -
12 DLR Germany 1 60
UND RAUMFAHRT EV
BUNDESMINISTERIUM FUER
13 BMG Germany 1 60
GESUNDHEIT
SACHSISCHES STAATSMINISTERIUM
14 SMWK Germany 1 60
FUR WISSENSCHAFT UND KUNST
NEMZETI KUTATASI FEJLESZTESI ES
15 NKFIH Hungary 1 60
INNOVACIOS HIVATAL
16 THE HEALTH RESEARCH BOARD HBR Ireland 1 60
17 MINISTRY OF HEALTH CSO-MOH Israel 1 60
18 MINISTERO DELLA SALUTE IT-MoH Italy 1 60
FONDAZIONE REGIONALE PER LA
19 FRRB Italy 1 60
RICERCA BIOMEDICA
VALSTS IZGLITIBAS ATTISTIBAS
20 VIAA Latvia 1 60
AGENTURA
21 FONDS NATIONAL DE LA RECHERCHE FNR Luxembourg 1 60
22 NORGES FORSKNINGSRAD RCN Norway 1 60
NARODOWE CENTRUM BADAN I
23 NCBR Poland 1 60
ROZWOJU
Page 4 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
1.2. List of Beneficiaries
Project Project
No Name Short name Country entry exit
month8 month
Unitatea Executiva pentru Finantarea
24 Invatamantului Superior, a Cercetarii, UEFISCDI Romania 1 60
Dezvoltarii si Inovarii
25 Ministrstvo za izobrazevanje, znanost in sport MIZS Slovenia 1 60
CENTRO PARA EL DESARROLLO
26 CDTI Spain 1 60
TECNOLOGICO INDUSTRIAL.
DEPARTAMENT DE SALUT -
27 DS-CAT Spain 1 60
GENERALITAT DE CATALUNYA
COMUNIDAD FORAL DE NAVARRA -
28 GN Spain 1 60
GOBIERNO DE NAVARRA
VETENSKAPSRADET - SWEDISH
29 SRC Sweden 1 60
RESEARCH COUNCIL
30 ZORGONDERZOEK NEDERLAND ZON ZON Netherlands 1 60
TURKIYE BILIMSEL VE TEKNOLOJIK
31 TUBITAK Turkey 1 60
ARASTIRMA KURUMU
Page 5 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
1.3. Workplan Tables - Detailed implementation
1.3.1. WT1 List of work packages
WP Start End
WP Title Lead beneficiary10
Number9 month12 month13
WP1 Management 1 - ISCIII 1 60
Preparation and launch of the co-funded
WP2 10 - ANR 1 60
call
Evaluation and proposal selection of the
WP3 1 - ISCIII 3 60
co-funded call
Follow-up and monitoring of projects
WP4 19 - FRRB 11 60
resulting from the co-funded call
Communication, Exploitation and
WP5 17 - CSO-MOH 1 60
Dissemination of the results
Additional Joint Transnational Calls
WP6 (JTC2019, JTC2020 and –tentatively- 12 - DLR 6 60
JTC2021)
Strategic supporting activities to ensure
WP7 relevance, impact and sustainability of 18 - IT-MoH 1 60
ERA PerMed work
Page 6 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
1.3.2. WT2 list of deliverables
Due
Deliverable WP Dissemination
Deliverable Title Lead beneficiary Type 15 Date (in
Number14 number9 level16
months)17
Reports with
information on
D1.1 WP1 1 - ISCIII Report Public 12
cumulative expenditure
incurred
Reports with
information on
D1.2 WP1 1 - ISCIII Report Public 24
cumulative expenditure
incurred - 2nd year
Reports with
information on
D1.3 WP1 1 - ISCIII Report Public 36
cumulative expenditure
incurred - 3rd year
Reports with
information on
D1.4 WP1 1 - ISCIII Report Public 48
cumulative expenditure
incurred - 4th year
Reports with
information on
D1.5 WP1 1 - ISCIII Report Public 60
cumulative expenditure
incurred - 5th year
Confidential Call Confidential,
documents: MoU, only for members
Governance of the of the consortium
D2.1 WP2 10 - ANR Report 3
call and evaluation (including the
and ethic assessment Commission
procedures Services)
Public Call documents:
Call text, Guidelines
D2.2 WP2 10 - ANR Report Public 3
for applicants, Proposal
template
Final ranking
list of proposals
D3.1 WP3 1 - ISCIII Report Public 10
recommended for
funding
Confidential,
only for members
Independent Observers’ of the consortium
D3.2 WP3 1 - ISCIII Report 11
report on the evaluation (including the
Commission
Services)
Confidential,
only for members
Joint selection list of
of the consortium
D3.3 projects to be funded - WP3 1 - ISCIII Report 12
(including the
1st call
Commission
Services)
Page 7 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Due
Deliverable WP Dissemination
Deliverable Title Lead beneficiary Type15 Date (in
Number14 number9 level16
months)17
Formal and duly signed
Confidential,
commitment on the
only for members
availability of funds for
of the consortium
D3.4 the selected projects WP3 1 - ISCIII Report 18
(including the
from each consortium
Commission
partner participating in
Services)
the EC co-funded call
Confidential,
only for members
Joint selection list of
of the consortium
D3.5 projects to be funded - WP3 1 - ISCIII Report 24
(including the
2nd call
Commission
Services)
Confidential,
only for members
Joint selection list of
of the consortium
D3.6 projects to be funded - WP3 1 - ISCIII Report 36
(including the
3rd call
Commission
Services)
Confidential,
only for members
Joint selection list of
of the consortium
D3.7 projects to be funded - WP3 1 - ISCIII Report 48
(including the
4th call
Commission
Services)
Confidential,
only for members
Joint selection list of of the consortium
D3.8 WP3 1 - ISCIII Report 48
funded projects (including the
Commission
Services)
Confidential,
M&A report containing
only for members
lessons learned and
of the consortium
D4.1 recommendations WP4 19 - FRRB Report 15
(including the
by the Call Steering
Commission
Committee
Services)
Confidential,
only for members
Mid-term evaluation
of the consortium
D4.2 report of EC co-funded WP4 1 - ISCIII Report 36
(including the
projects
Commission
Services)
Confidential,
only for members
Final Evaluation report
of the consortium
D4.3 of EC co-funded WP4 1 - ISCIII Report 48
(including the
projects
Commission
Services)
Page 8 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Due
Deliverable WP Dissemination
Deliverable Title Lead beneficiary Type15 Date (in
Number14 number9 level16
months)17
Newsletter content
for dissemination of
D5.1 results of the co-funded WP5 17 - CSO-MOH Report Public 14
call and follow-up of
funded projects
D5.2 Final brochure content WP5 17 - CSO-MOH Report Public 58
List of project
Confidential,
proposals selected by
only for members
PRP, recommended for
of the consortium
D6.1 funding by CSC and WP6 10 - ANR Report 24
(including the
funded by national and
Commission
regional funders the
Services)
JTC 2019
List of project
Confidential,
proposals selected by
only for members
PRP, recommended for
of the consortium
D6.2 funding by CSC and WP6 12 - DLR Report 36
(including the
funded by national and
Commission
regional funders the
Services)
JTC 2020
Report on the midterm
assessment of ERA
D6.3 WP6 10 - ANR Report Public 56
PerMed projects funded
under JTC2019
Monitoring report
of the ERA PerMed
D6.4 WP6 12 - DLR Report Public 59
additional non-EC co-
funded call
Monitoring report
D6.5 of the ERA PerMed WP6 10 - ANR Report Public 48
activities
Report on patient
involvement and
D7.1 WP7 30 - ZON Report Public 54
empowerment in ERA
PerMed
Report on external
D7.2 relations and funders WP7 1 - ISCIII Report Public 56
engagement
Report on sustainability
R&I funding,
D7.3 management structure WP7 10 - ANR Report Public 58
for it and operational
plan
Page 9 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
1.3.3. WT3 Work package descriptions
Work package number 9 WP1 Lead beneficiary 10 1 - ISCIII
Work package title Management
Start month 1 End month 60
Objectives
The overall objective of this work package is to ensure professional, efficient and transparent management and
coordination of all other ERA PerMed WPs towards their objectives within time plan and budget. WP1 will also connect
and integrate ERA PerMed activities to and with ICPerMed and the governing structure and joint activities of the ERA-
Net.
The WP1 leader will:
• Establish the management structures and set up the rules for decision making processes in agreement with the ERA
PerMed partners
• Manage all administrative, ICT, legal and financial issues
• Supervise the day-to-day activities according to the implementation plan
• Represent the consortium towards the EC, funding organisation, ICPerMed and other initiatives
• Set up a webpage of ERA PerMed
• Organise a kick-off meeting
Description of work and role of partners
WP1 - Management [Months: 1-60]
ISCIII
Task 1.1: Implementation of the working and advisory structures and Network Steering Committee (NSC) and their
meetings (Task leader: ISCIII; Contributors: all partners)
The governance structure is composed of three management bodies:
• The Network Steering Committee (NSC) is the main decision making body, composed of one representative per
partner; each partner will have the possibility to appoint proxy representatives to deal with specific consortium issues
(financial, strategic, etc.)
• The Coordination Unit (CU), based at the National Institute of Health Carlos III (ISCIII) will consist of the coordinator,
project scientific and financial management, and ICT and administrative project support. The CU will carry out the day-
to-day operational management. It will be the primary contact point for all partners, the different project committees
of the ERA-Net, the EC and ICPerMed, as well as other key stakeholders and European and international initiatives
that are important in developing a strategic alignment. The CU will manage the following overall legal, contractual,
technical and administrative issues:
- Set-up of the consortium agreement (CA)
- Helpdesk for the consortium regarding Horizon 2020 financial and contractual rules
- Follow up and monitoring of the project progress and fulfilment of deliverables and milestones
- Coordination and support of the work packages
- Preparation and drafting of the minutes of the NSC/OG physical and tele-meetings
- Carry out the day-to-day operational management of the project
• The Operational Group (OG) is composed of the Coordinator, WPLs and NSC Chair and Vice-chair who will support
the CU in the daily activities. Each WP Leader is responsible for the achievements of its respective WP in connection
with each Task leader (TL) within its WP. Each TL is responsible for the achievements of its respective task in connection
with task contributors.
• In addition, for each joint transnational call (JTC), a Call Steering Committee (CSC) will be established. The CSC
will be composed of one representative per partner participating as call funder. Each partner will have a possibility to
appoint proxy representatives to deal with specific joint call issues (financial, strategic, etc.).
At the official start of ERA PerMed, the coordinator will organise a NSC kick-off meeting to discuss and update the
decision-making rules of the network and other operational procedures according to the rules of the ERA-Net Cofund
scheme. The NSC will elect its Chair and Vice-chair to support the coordination and assure equity of governance. NSC
Chair and Vice-chair may be (re)elected each year.
Page 10 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Task 1.2: Internal liaison with ERA PerMed partners, management committees (Task leader: ISCIII; Contributors: all
partners)
ERA PerMed partners will gather at least 2 times per year for NSC meetings. Communication within the consortium,
in particular those leading WPs (or OG), tasks and subtasks, will be established through regular conference calls,
exchange of e-mails and additionally supported via intranet of the ERA PerMed website. The Intranet is a secured bank
of documents accessible to all partners comprising all documents necessary for the activities of the consortium.
Task 1.3: Liaison and reporting to the EC (Task leader: ISCIII, Spain; Contributors: all partners)
The CU will be responsible for any communication, interaction and contact between the European Commission and
project partners including:
• Transaction of budget
• Collection of cost statements and, if required, audit certificates from partners
• Preparation of scientific and technical reports
• Informing the EC on any changes in the project via the information letters or (if applicable) proposition of amendments
to the Grant Agreement (GA)
Task 1.4: Maintenance of ERA PerMed ICT and website (Task leader: ISCIII; Contributors: DLR)
The ERA PerMed Information and Communication Technologies (ICT) and website will be launched at the project
starts and will be periodically updated. This activity can be carried out in synergy with the ICPerMed Secretariat if
agreed. These tasks will be focused on:
• Public area: main sections (home, publications, calls for proposals and results, help desk information, events and news,
FAQ, etc.) will be created according to the ERA PerMed partners.
• Intranet (access for ERA PerMed partner’s only): current intranet will be maintained to facilitate the communication
between partners. Access rights will be provided to all partners and each WPL and TL for coordination activities.
A crosslink to the ICPerMed website from the public area will be added.
Task 1.5: Liaison with ICPerMed (Task leader: ISCIII; Contributors: DLR, ANR, IT-MoH)
This Task will serve as a bridge between ICPerMed (policy) and ERA-Net (research funding). The ICPerMed Secretariat,
comprised of DLR (Germany), ANR (France), IT-MoH (Italy) and ISCIII (Spain), all of them included in this proposal,
will advise ERA PerMed e.g. on the implementation of the Roadmap and Action Plan, i.e. helping in the selection of
topics for the joint calls for proposals.
Papers and guidelines delineating common policies to improve the research funding impact through data sharing,
common standard, etc will be part of the final report.
Participation per Partner
Partner number and short name 10
10 - ANR
12 - DLR
18 - IT-MoH
19 - FRRB
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in
Number14
months)17
Reports with information
D1.1 on cumulative 1 - ISCIII Report Public 12
expenditure incurred
Reports with information
D1.2 1 - ISCIII Report Public 24
on cumulative
Page 11 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
expenditure incurred -
2nd year
Reports with information
on cumulative
D1.3 1 - ISCIII Report Public 36
expenditure incurred -
3rd year
Reports with information
on cumulative
D1.4 1 - ISCIII Report Public 48
expenditure incurred -
4th year
Reports with information
on cumulative
D1.5 1 - ISCIII Report Public 60
expenditure incurred -
5th year
Description of deliverables
D1.1: Intermediate reports to the EC (Month 12, 28, 44)
D1.2: Reports with information on cumulative expenditure incurred (Month 12, 36, 60)
D1.3: Final Report (Month 60)
Milestones
M1.1: Establishment of management bodies: Coordination Unit (CU), Operational Group (OG) and Network Steering
Committee (NSC) (Month 1)
D1.1 : Reports with information on cumulative expenditure incurred [12]
Reports with information on cumulative expenditure incurred.
D1.2 : Reports with information on cumulative expenditure incurred - 2nd year [24]
Reports with information on cumulative expenditure incurred
D1.3 : Reports with information on cumulative expenditure incurred - 3rd year [36]
Reports with information on cumulative expenditure incurred.
D1.4 : Reports with information on cumulative expenditure incurred - 4th year [48]
Reports with information on cumulative expenditure incurred.
D1.5 : Reports with information on cumulative expenditure incurred - 5th year [60]
Reports with information on cumulative expenditure incurred.
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
Establishment of management Establishment of management
bodies: Coordination Unit bodies: Coordination Unit
MS1 (CU), Operational Group 1 - ISCIII 1 (CU), Operational Group
(OG) and Network Steering (OG) and Network Steering
Committee (NSC) Committee (NSC)
Page 12 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Work package number 9 WP2 Lead beneficiary 10 10 - ANR
Work package title Preparation and launch of the co-funded call
Start month 1 End month 60
Objectives
The funding of transnational collaborative research is the most effective joint activity to enhance the cooperation
between scientists working in Europe and beyond on personalised medicine (PM) and thus reducing fragmentation of
research in this field.
The aim of this work package is to prepare and launch the co-funded joint transnational call (JTC2018) for proposals
that will result in funding of transnational research projects in PM. This call will combine for the first time budget
contributions from the participating European Member States and Associated countries to Horizon 2020, the EC and
additional research funders to maximise the synergies of funding transnational research projects in PM. The call will
relate to the SRIA of the PerMed project and also serve as an important implementation tool for the goals of the
International Consortium in PM (ICPerMed) and its Action Plan.
This work package will provide all relevant call documents –i.e. Call Pre-Announcement, Call Text, Governance
and Evaluation document and procedures, Memorandum of Understanding, Guidelines for Applicants, Evaluation
Guidelines -and set up the electronic submission tool for the pre- and full proposal stages. The launch of the call will
be promoted to the research community, and consultation will be provided to the potential applicants at national and
international level. The implementation of transnational research funding will be streamlined according to the lessons
learned from other ERA-Nets and their co-funded calls.
Description of work and role of partners
WP2 - Preparation and launch of the co-funded call [Months: 1-60]
ANR
Description of work (WPL: ANR. Task leader: ISCIII)
The representatives of the participating funding agencies will constitute the CSC that will decide on the topic(s) and the
specific design of the JTC. The Joint Call Secretariat (JCS) will be established at ISCIII (Partner 1). The JCS will act
as a central helpdesk to the applicants regarding all aspects of proposal drafting and submission and will be in charge
of the management of the evaluation of the JTC (WP2, WP3). The CSC will monitor all actions taken by the JCS.
Task 2.1: Topic selection (Task leader: ANR; Contributors: all partners participating in the EC co-funded call)
For the call topic development of the co-funded call, ERA PerMed partners will refer to the PerMed SRIA and the
ICPerMed Action Plan (see also description in “1.1 Objectives” and “3.1 Project Plan”).
The partners agreed on a general concept for all JTCs along the five challenges developed within the SRIA: Challenge
1 – Developing Awareness and Empowerment, Challenge 2 – Integrating Big Data and ICT Solutions, Challenge 3 –
Translating Basic to Clinical Research and Beyond, Challenge 4 – Bringing Innovation to the Market, Challenge 5 –
Shaping Sustainable Healthcare.
For the EC co-funded JTC2018 the Coordination Unit of ERA PerMed already performed a survey to identify research
areas in relation to the PerMed SRIA that are of interest and fundable for the partners. The clusters used for the survey
have been derived from the five SRIA challenges (see above) and comprised the main topics of each challenge. The
two top ranked research clusters out of six options were:
1. Validation, pre-clinical and clinical biomedical research –corresponding to challenge 3 of the PerMed SRIA:
“Translating Basic to Clinical Research and Beyond”;
2. Data analysis, management and protection, including ethical, legal and social implications –corresponding to
challenge 2 of the PerMed SRIA: “Integrating Big Data and ICT Solutions”.
The topic for the first EC co-funded call will be a combination of these two clusters/challenges. Thereby, the ERA
PerMed has a direct connection to the CSA PerMed SRIA/ICPerMed. The call topic will be pre-defined by the ERA-
Net consortium, taking into account those research activities that are suitable for the cofund instrument. ANR together
with the ERA PerMed partners will identify appropriate experts that will form a Call Advisory Board (CAB). They will
meet to refine the topic in order to ensure scientific relevance, correctness and feasibility. For refining the call topic,
the ICPerMed Action Plan will also be taken into account.
Each partner joining the EC co-funded call as funder will decide which cluster/challenge and which segment of the
value chain shall be covered by its budget in respect to the respective regional or national research community.
Page 13 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Special consideration will be given to avoid duplication with Horizon 2020 calls in the area of PM. The Call Text with
the call topic will be validated by the CSC at the start of the ERA PerMed project. The projects must be transnational
projects involving at least three independent entities from three different EU Member States or Associated Countries
to Horizon 2020.
Task 2.2: Establishment of the Joint Call Secretariat (JCS) and the Call Steering Committee (CSC) (Task leader: ISCIII;
Contributors: all partners participating in the EC co-funded call)
The JCS for the co-funded call will be under the responsibility of the ISCIII. The JCS will act as a central helpdesk to
the applicants regarding all aspects of the call including proposal drafting and submission.
In addition, each participating funding organisation will establish its national contact point to support applicants for
advice on national rules and regulations, including eligibility and financial budget regulations.
The representatives of the participating funding agencies will constitute the CSC to monitor all actions taken by the JCS.
Task 2.3: Preparation of the call documents; (Task leader: ANR; Contributors: all partners participating in the EC co-
funded call)
ANR will be responsible for drafting and finalising all necessary documents as well as harvesting the necessary
information and signatures from the participating organisation. The EC will be duly notified of the call and its content
at least 30 days before the expected date of publication. The documents include:
1. The Call Text, which delineates the aim and the topic of the call, the application procedures (including deadlines), the
evaluation procedures as well as other financial and legal issues including intellectual property (IPR) and open access
publication. The call text will be submitted to the EC for approval.
2. The Memorandum of Understanding (MoU), which will serve as a joint statement of intention between the funding
organisations participating in the EC co-funded call. The MoU reflects the commitment of the partners who agree to
make every reasonable effort to fulfil the intents expressed in this co-funded call as well as their earmarked budget. The
MoU will be put in place only in case if the launch of the call would be planned before the official signature of the Grant
Agreement with the EC. Otherwise, the content of the MoU is considered redundant with the GA.
3. The governance of the call, evaluation and ethic assessment document, which describes in detail steps and rules of
the EC co-funded call, especially the two-stage evaluation and selection process (see WP3), and project monitoring
(see WP4).
4. Guidelines for applicants, which describe the administrative details of the application procedure and include country
specific information from different national/regional funding agencies. These outline the relevant national/regional rules
and regulations which applicants must adhere to in order to be eligible for funding. The guidelines will include the
requirement of a publishable abstract of the proposal, to be used for dissemination purposes only in case of success (see
Task 5.2, communication and dissemination of the results of the co-funded call).
5. Proposal templates for pre-proposal and full proposal stage. Pre- and full-proposal templates will be developed based
on the available versions used in previous ERA-Nets Cofund. The templates will be modified for the purpose of the
ERA PerMed co-funded call.
In addition to these documents, the partner ISCIII will set up the electronic submission and evaluation system for the
call. For instance, the DLR ‘pt-outline’, ANR, IT-MoH and ISCIII submission systems have proven highly reliable in
several previous transnational calls, and it will be adapted to the specific requirements of the EC co-funded call.
Task 2.4: Launch of the co-funded call (Task leader: ANR; Contributors: all partners participating in the co-funded call)
The call for proposals will be published on the ICPerMed and ERA PerMed websites and by the national funding
organisations via their national publishing routines such as websites, newsletters, and press announcements. The
publishing instruments of the EC like ERA-LEARN H2020 and EC Participant Portal will be used as well. Additional
routes will include as e.g. a presentation of the co-funded call at relevant scientific meetings. If feasible and necessary, a
call pre-announcement will be published to maximize the early mobilization of the research community. The Call Text
will be submitted to the EC for approval at least 30 days before the expected date of publication. The call will be opened
for the submission of pre-proposals for at least 60 days.
Participation per Partner
Partner number and short name 10
1 - ISCIII
3 - CIHR
9 - AKA
Page 14 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
Confidential Call Confidential, only
documents: MoU, for members of the
D2.1 Governance of the call 10 - ANR Report consortium (including 3
and evaluation and ethic the Commission
assessment procedures Services)
Public Call documents:
Call text, Guidelines
D2.2 10 - ANR Report Public 3
for applicants, Proposal
template
Description of deliverables
D2.1: Confidential Call documents: Memorandum of Understanding (MoU), Governance of the call and evaluation
and ethic assessment procedures (Month 3)
D2.2: Public Call documents: Call Text, Guidelines for applicants, Proposal template (Month 3)
Milestones
M2.1: Establishment of the Joint Call Secretariat and the Call Steering Committee (Month 2)
M2.2: Launch of the EC co-funded call, JTC2018 (Month 3)
D2.1 : Confidential Call documents: MoU, Governance of the call and evaluation and ethic assessment procedures [3]
Confidential Call documents: MoU, Governance of the call and evaluation and ethic assessment procedures
D2.2 : Public Call documents: Call text, Guidelines for applicants, Proposal template [3]
Public Call documents: Call text, Guidelines for applicants, Proposal template
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
Establishment of the Joint Establishment of the Joint
MS2 Call Secretariat and the Call 1 - ISCIII 2 Call Secretariat and the Call
Steering Committee Steering Committee
Launch of the EC co-funded Launch of the EC co-funded
MS3 10 - ANR 3
call, JTC2018 call, JTC2018
Page 15 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Work package number 9 WP3 Lead beneficiary 10 1 - ISCIII
Work package title Evaluation and proposal selection of the co-funded call
Start month 3 End month 60
Objectives
The aim of this work package is the management of the evaluation of the proposals submitted in response to the co-
funded call (WP2) and the selection of excellent translational proposals for funding. The submission and evaluation of
the proposals will be carried out in two-steps, with the applicants getting the chance to respond to reviews during the
second evaluation step. The evaluation will be based on a centrally organised international scientific peer review.
Description of work and role of partners
WP3 - Evaluation and proposal selection of the co-funded call [Months: 3-60]
ISCIII
Description of work (WPL: ISCIII. Task leaders: FRRB, AKA, DLR)
The submission, evaluation and proposal selection will use the procedure implemented successfully in other ERA-Nets
in the areas of health research, and will operate in accordance with the rules and regulations set forth by the EC for
Horizon 2020. The consortium will take all lawful steps to ensure confidentiality of information and documents obtained
during the evaluation and selection procedures of the joint call.
Task 3.1: Establishment of the international Peer Review Panel (PRP) (Task leader: ISCIII; Contributors: DLR, NKFIH,
FRRB)
The JCS will be responsible for the establishment of the international Peer Review Panel (PRP) which will consist
of independent external experts in the field of personalised medicine. The composition of the PRP will be based on
the propositions of the CSC with additional input from the JCS. The PRP members will be internationally recognised
external and independent scientists chosen for their scientific, technical and/or disease-specific expertise in the field of
PM. The PRP will be as far as possible gender and geographically balanced, and may include experts from countries/
regions participating and not participating in the EC co-funded call. Reviewers will be carefully selected with regard
to any potential conflict of interest.
Selection and appointment of an Independent Observer. The independent observer will be an internationally recognised
expert who shall assess the conformity of the implementation of the joint call and, in particular, review the proper
implementation of the independent international peer review and the establishment of the ranking list of trans-national
projects.
Task 3.2: Review of pre-proposals (Task leader: FRRB; Contributors: AKA, NKFIH, ISCIII, IT-MoH)
Formal check of submitted pre-proposals
Applicants are invited to submit pre-proposals, which describe the proposed work. In a first stage, the JCS will check all
pre-proposals to ensure that they meet the call’s formal criteria (date of submission; number and country distribution of
participating research groups; category of partners; inclusion of all necessary information in English; page length). The
transnational research proposals will need to involve at least three independent entities from three different countries
or regions participating in the co-funded call. The JCS will forward the proposals to CSC members who will perform
a verification of compliance to country/region rules (eligibility check). Solutions will first be explored by each CSC
member to ensure no proposal is excluded for minor eligibility issues. If no solution can be found, proposals which do
not meet the formal conditions will be rejected without further review.
Remote evaluation of pre-proposals
Eligible pre-proposals will be assessed by the PRP via remote evaluation. The CSC will be support the JCS in selecting
the PRP members and assigning the proposals to PRP members. Each pre-proposal will be sent to at least three PRP
members who are specialists in the approach in question. However, if for a certain proposal special expertise is needed
and not offered by the PRP, ad hoc written reviews will be obtained from additional independent experts. All reviewers
will be asked to use a common evaluation form for the written reviews. The evaluation of proposals will be aligned
on the scoring system (from 0 to 5) and evaluation criteria (‘excellence’, ‘impact’ and ‘quality and efficiency of the
implementation’) stated in Annex H of the General Annexes of the Horizon 2020 Work Programme 2016-2017. The
written statements from the reviewers will be collected by the JCS.
Invitation for submission of full-proposals
Page 16 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
The CSC will decide if the PRP members or a subset of them need to meet physically to discuss the evaluation results
of pre-proposals and select the proposals that should be invited for full submission or if the CSC can decide which pre-
proposals to invite for full submission, based on the remote evaluations. This will primarily depend on whether there
is a high degree of discrepancy between individual assessments of the same proposal, as this would indicate a need for
expert discussions and re-assessment of scores. The number of proposals selected for the second stage should not be
higher than 2-3 times the number of proposals that could be funded. The JCS will invite the coordinators of the selected
pre-proposals to submit full proposals for the second evaluation step. The written evaluation reports will be anonymised
and each one sent to the respective coordinators of the pre-proposal whether successful or not. The JCS will make an
analysis of the oversubscription factor of each funding agency after the selection of the pre-proposals. CSC members
with important oversubscription factors should try to increase their earmarked budgets in order to avoid funding gaps
in the final ranking list.
Task 3.3: Review of full-proposals (Task Leader: ISCIII; Contributors: AKA, NKFIH, FRRB, IT-MoH)
Formal check of submitted full proposals
The JCS will check the submitted full proposals to ensure that they meet all formal criteria and have not changed
substantially from the respective pre-proposals.
Remote evaluation of full proposals and Right to response of the applicants (Rebuttal step)
The full proposals will be reviewed by at least three PRP members, preferably the same experts who evaluated the
pre-proposal. All reviewers will be asked to use a common evaluation form for the written reviews and to score the
proposals according to the evaluation criteria and scoring system mentioned above (Task 3.2). The anonymized written
evaluations of reviewers will be sent to the project coordinators to allow them to respond to the evaluators’ comments in
so called “rebuttal step” prior to the PRP meeting. Applicants will have one week to answer the reviewer’s assessment.
Once collected, the JCS will then send the pooled reviews and rebuttals to the PRP members.
PRP meeting to discuss the full proposals and establish a ranking list
The JCS will be supported by the CSC member in whose country the PRP meeting will take place for the organisation.
The PRP members will meet to discuss each proposal taking into account the written reviews, rebuttals and their own
expertise. Finally, the PRP will produce the ranking list of those proposals recommended for funding according to the
evaluation results and discussions (D3.1). The PRP members will prepare a brief written summary of the written reviews
as well as panel discussions for all proposals, which will be collected by the JCS. The anonymized written summaries
will be forwarded to the applicants. The CSC members will be present at the PRP meeting as observers. In addition,
an independent expert will be invited to the PRP meeting as official observer. He or she will assess the conformity of
the general implementation of the JTC with EC rules, specifically the proper implementation of the international peer
review process as wells as the establishment of the ranking list of transnational projects. The assessment of the observer
will be provided in a report to the EC (D3.2).
Task 3.4: National and transnational funding decisions (Task leader: ISCIII; Contributors: DLR, NKFIH, FRRB)
The CSC will take its final funding decision based strictly on the scientific recommendation of the PRP (ranking list). The
ranking list will be strictly followed as long as national/regional and EC top-up funding is available. As many proposals
as possible with a clear funding recommendation will be funded, taking into account the available budget. Each eligible
applicant will be funded by the organisation of the country from which the applicant has applied and according to the
respective national/regional administrative regulations (virtual common pot model). The final distribution of the EC
top-up funding will be discussed and agreed by the CSC in order to maximize the number of high quality proposals to be
funded by filling funding gaps and/or topping up the national contributions according to the mixed mode specify in the
Consortium Agreement. The list of projects to be funded will be communicated to the EC (D3.3) and to the civil society
(Task 5.2). Project coordinators will be informed about the final funding decision of their proposals. Subsequently, the
national/regional negotiations will take place. The final funding list will be prepared by the JCS and provided to WP5
leader for publication on the ERA PerMed website and newsletter, the relevant EC portals as well as further suitable
dissemination channels (see WP5).
Task 3.5: Lessons learned from the EC co-funded call (JTC 2018) implementation process (Task leader: ISCIII;
Contributors: ANR)
This task aims to assess and to report on the co-funded call implementation process including the preparation of the call
documents, the evaluation process and the output of the co-funded call (JTC2018). This report aims to determine the
efficiency and relevance of the co-funded call (JTC2018) and will be of high value for the additional calls planned inside
the initiative (JTC2019, JTC2020, and –tentative- JTC2021). A set of indicators for the assessment will be determined
at the start of ERA PerMed, in agreement with all partners.
Page 17 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participation per Partner
Partner number and short name 10
9 - AKA
10 - ANR
12 - DLR
15 - NKFIH
18 - IT-MoH
19 - FRRB
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in
Number14
months)17
Final ranking list of
D3.1 proposals recommended 1 - ISCIII Report Public 10
for funding
Confidential, only
for members of the
Independent Observers’
D3.2 1 - ISCIII Report consortium (including 11
report on the evaluation
the Commission
Services)
Confidential, only
Joint selection list of for members of the
D3.3 projects to be funded - 1 - ISCIII Report consortium (including 12
1st call the Commission
Services)
Formal and duly signed
commitment on the Confidential, only
availability of funds for for members of the
D3.4 the selected projects from 1 - ISCIII Report consortium (including 18
each consortium partner the Commission
participating in the EC Services)
co-funded call
Confidential, only
Joint selection list of for members of the
D3.5 projects to be funded - 1 - ISCIII Report consortium (including 24
2nd call the Commission
Services)
Confidential, only
Joint selection list of for members of the
D3.6 projects to be funded - 1 - ISCIII Report consortium (including 36
3rd call the Commission
Services)
Joint selection list of Confidential, only
D3.7 projects to be funded - 1 - ISCIII Report for members of the 48
4th call consortium (including
Page 18 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
the Commission
Services)
Confidential, only
for members of the
Joint selection list of
D3.8 1 - ISCIII Report consortium (including 48
funded projects
the Commission
Services)
Description of deliverables
D3.1: Final ranking list of proposals recommended for funding (Month 10)
D3.2: Independent Observers’ report on the evaluation (Month 11)
D3.3: Joint selection list of projects to be funded (Month 12)
D3.4: Formal and duly signed commitment on the availability of funds for the selected projects from each consortium
partner participating in the EC co-funded call (Month 18)
Milestones
M 3.1: PRP and Independent Observer established (Month 7)
M 3.2: Publication of the final funding decisions on website (Month 12)
D3.1 : Final ranking list of proposals recommended for funding [10]
Final ranking list of proposals recommended for funding
D3.2 : Independent Observers’ report on the evaluation [11]
Independent Observers’ report on the evaluation
D3.3 : Joint selection list of projects to be funded - 1st call [12]
Joint selection list of projects to be funded
D3.4 : Formal and duly signed commitment on the availability of funds for the selected projects from each
consortium partner participating in the EC co-funded call [18]
Formal and duly signed commitment on the availability of funds for the selected projects from each consortium
partner participating in the EC co-funded call
D3.5 : Joint selection list of projects to be funded - 2nd call [24]
Joint selection list of projects to be funded - 2nd call
D3.6 : Joint selection list of projects to be funded - 3rd call [36]
Joint selection list of projects to be funded - 3rd call
D3.7 : Joint selection list of projects to be funded - 4th call [48]
Joint selection list of projects to be funded - 1st call
D3.8 : Joint selection list of funded projects [48]
Joint selection list of funded projects.
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
PRP and Independent PRP and Independent
MS4 1 - ISCIII 7
Observer established Observer established
Page 19 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
Publication of the final Publication of the final
MS5 1 - ISCIII 12
funding decisions on website funding decisions on website
Page 20 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Work package number 9 WP4 Lead beneficiary 10 19 - FRRB
Work package title Follow-up and monitoring of projects resulting from the co-funded call
Start month 11 End month 60
Objectives
The main objectives of WP4 are:
1. Monitor the implementation and progress of the research projects granted as a result of the co-funded call JTC2018.
2. Assess the performances of the co-funded projects and estimate their compliance with the scope of ERA PerMed.
The work will be carried out in close collaboration with the JCS of the co-funded call (WP3).
Monitoring and Assessment (M&A) is intended to provide information that is credible and useful on the projects that
have been financed through the cofounded call, enabling the ERA-Net JCS, the funding agencies and the beneficiary
organisations to judge the impacts of their efforts as well as translate results and lessons learned into the decision
and policy-making process (science based health care approach). This process will timely adjust any unbalances and
strengthen any weaknesses that might surface during the implementation and execution of co-funded JTC as well as
the ERA-Net itself.
The Monitoring and Assessment activities will focus on the performances of the funded projects in terms of relevance
and fulfilment of the objectives, evaluation of the progress, achievement of the expected impacts, gender dimension
and Responsible Research aspects.
With regard to the timeframe of M&A Analysis, after the co-funded JTC Projects have been granted we will conduct
2 different M&A:
-1 Interim Evaluation: at month 18 the Project’s coordinator will submit a completed M&A.
- 1 Final Evaluation (to be delivered at month 36).
NB: a post evaluation of the co-funded project is not possible within the timeframe of the ERA-Net.
The M&A will consist of a so-called Real Time Evaluation (RTE), aimed to assess the project results at the moment
that the M&A is conducted.
The chosen criteria against which evaluate the project will be gathered in Indicators Tracking Table (ITT), where
scientific evaluation and their potential impacts on the society, thematic evaluation (i.e. gender impact assessment, RRI,
etc.) and cluster evaluation (aimed to assess cross-sectorial and cross-organisational aspects) will be included. Elements
of meta-evaluation (aimed at assessing and improving the M&A process itself for the coming JTCs) is to be considered.
The consortium aims to use a self-evaluation approach, which means that the M&A is conducted by project coordinators
using a template of the Indicator Tracking Table, elaborated within the WP4. The potential lack of information, as the
self-evaluation approach might be perceived as more subjective (biased or one-sided) is mitigated by a peer review of
the ITT by CSC.
Description of work and role of partners
WP4 - Follow-up and monitoring of projects resulting from the co-funded call [Months: 11-60]
FRRB
Description of work (WPL: FRRB. Task leaders: FRRB, ISCIII, CSO-MOH)
Task 4.1: Definition of the indicators, sampling methods and plan for information and data collection and management
(Task Leader FRRB; Contributors: ISCIII, CSO-MOH, UEFISCDI, IT-MoH)
Firstly, the needs and expectations of the participant funding agencies and key stakeholders’ (i.e. ICPerMed) are
surveyed and collected. The latter will form Monitoring and Assessment (M&A) requirements, which will be then
included in the Indicator Tracking Table (ITT) to be sent to the cofunded project coordinators. Sampling methods will
be proposed and approved.
Once the ITT has been prepared, it will be distributed to the funded project coordinators. The coordinators and partners
of co-funded projects will be invited to complete the reports within the set deadlines. The monitoring team will directly
contact the project coordinators for information delivery, reporting requests and the reporting analysis.
In case the information gathered from the M&A is poor, the consortium shall evaluate the use of secondary sources of
data and/or tailor made surveys to be sent to the Project partners, in order to integrate missing data/information.
Page 21 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Task 4.2: Data collection and Analysis (Execution of the statistical analysis of the output of the co-funded joint call)
(Task Leader CSO-MOH, Contributors: ISCIII, FRRB, IT-MoH, UEFISCDI)
This task is intended to execute the evaluation of the funded projects and encompasses the Data/Information
Preparation, Data/Information Analysis (findings and conclusions), Data/Information Validation, Data Presentation,
Recommendation and Action Plan. The task leader has the responsibility to collect the ITTs and present the information
in a clear manner to the ERA PerMed partners.
Task 4.3: Follow-up of monitoring activities and decision making process (Task leader: FRRB, Contributors: ISCII,
CSO-MOH, IT-MoH, UEFISCDI)
The results obtained with the M&A analysis will be then translated by the CU in a series of recommendation to the
attention of the NSC which discusses and eventually adopts them.
Since it is important to translate the funded project results in policy making decisions, the reports of the M&A will
receive high visibility (through the Communication and Dissemination tools described below).
For what concerns the M&A, the outcomes of the process will be used to correct potential mistake and establish self-
learning mechanisms for the next JTCs.
The results of the ERA PerMed co-funded projects follow-up and assessment will be presented to the ERA PerMed
consortium partners and translated in a decision making process. The outcomes of this task will also be forwarded to
the responsible of WP2 in order to be integrated in the “lesson learned guidelines”.
Task 4.4 Mid-term and Final evaluation (Task leader: ISCIII, Contributors: CSO-MOH, FRRB, IT-MoH, UEFISCDI)
This task aims to both evaluate the progress and assess the outputs of the projects granted under the co-funded call.
The evaluation will be carried out in close collaboration with the CUt and the WP3 leader. The accountability of projects/
programmes funded with public money is a strategic priority for the funding agencies as well as the EC, therefore the
participation of the coordinators of the co-funded projects in this monitoring process will clearly appear in the Call
Text as an obligation.
Follow-up through monitoring reports
All co-funded projects will be required to complete the assessment forms, and ERA PerMed will develop a process to
insure compliance. ERA PerMed co-funded projects will be followed up and monitored through a mid-term progress
report, halfway through the project development, and through a final report at the end of the funding period, in addition
to the national reporting requirements. The report format will be customized using previously established and updated
forms. The coordinators and partners of granted projects will be invited to complete the reports in the indicated period.
The monitoring team will directly contact the granted project coordinators for information delivery, reporting requests
and the reporting analysis. The results of the EC co-funded projects follow-up and assessment will be presented to the
ERA PerMed consortium partners on a regular basis.
The outcomes of the mid-term seminar and final symposium (Task 5.3 and Task 5.4) will be taken into account
respectively for the mid-term and for final evaluation reports.
The results of the assessment of the co-funded call will be made available in collaborations with the WP5 leader. The
updated information on the projects including details on participants and project results will be shared with the EC.
Participation per Partner
Partner number and short name 10
1 - ISCIII
17 - CSO-MOH
18 - IT-MoH
24 - UEFISCDI
Page 22 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
Confidential, only
M&A report containing
for members of the
lessons learned and
D4.1 19 - FRRB Report consortium (including 15
recommendations by the
the Commission
Call Steering Committee
Services)
Confidential, only
Mid-term evaluation for members of the
D4.2 report of EC co-funded 1 - ISCIII Report consortium (including 36
projects the Commission
Services)
Confidential, only
for members of the
Final Evaluation report of
D4.3 1 - ISCIII Report consortium (including 48
EC co-funded projects
the Commission
Services)
Description of deliverables
D4.1: M&A report containing lessons learned and recommendations by the Call Steering Committee (Month 15)
D4.2: Mid-term evaluation report of EC co-funded projects (Month 36)
D4.3: Final Evaluation report of EC co-funded projects (Month 48)
Milestones
M4.1: Approval of the list of indicators defined (Month 12)
M4.2: Approval by the Network Steering Committee of the lesson learned and recommendations by the Call Steering
Committee (Month 18)
D4.1 : M&A report containing lessons learned and recommendations by the Call Steering Committee [15]
M&A report containing lessons learned and recommendations by the Call Steering Committee
D4.2 : Mid-term evaluation report of EC co-funded projects [36]
Mid-term evaluation report of EC co-funded projects
D4.3 : Final Evaluation report of EC co-funded projects [48]
Final Evaluation report of EC co-funded projects
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
Approval of the list of Approval of the list of
MS6 19 - FRRB 12
indicators defined indicators defined
Approval by the Network Approval by the Network
Steering Committee of Steering Committee of
MS7 the lesson learned and 1 - ISCIII 18 the lesson learned and
recommendations by the Call recommendations by the Call
Steering Committee Steering Committee
Page 23 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Work package number 9 WP5 Lead beneficiary 10 17 - CSO-MOH
Work package title Communication, Exploitation and Dissemination of the results
Start month 1 End month 60
Objectives
The activities of this work package are focused on communication and dissemination of information on the EC co-
funded call and its outcome in order to create awareness among stakeholders and the general public. Special care will
be taken to increase the visibility and disseminate the results of the EC co-funded projects.
Description of work and role of partners
WP5 - Communication, Exploitation and Dissemination of the results [Months: 1-60]
CSO-MOH
Description of work (WPL: CSO-MOH. Task leaders: IT-MoH, ZonMw, MIZS)
Target audience for the communication and dissemination of the activities related to the co-funded call are the scientific
community, clinical sector, industrial partners, Programme Managing Agencies and Programme Owners, policy makers
at national, regional European and International level, regulators and general public.
Tools for communication will be the ERA-Net and EU relevant EC websites (see WP1 and WP2), social media such
as Facebook, leaflets, posters and newsletters distributed to the updated contact list and presentation in conferences,
especially those linked with clinical sector, innovation and industry.
ERA PerMed dissemination actions will be defined in collaboration with WP1 and WP2, and will be carried out in
collaboration with other WP leaders responsible for the JCS (WP3) and the Monitoring (WP4).
Task 5.1: Communication and dissemination on the launch of the co-funded call (Task Leader: CSO-MOH; Contributors:
IT-MoH)
This task aims to increase the visibility of the launch of the co-funded call. The main target groups can be divided into
two categories:
1. Potential applicants - researchers and/or clinicians – the core target group
2. Representatives of funding bodies from new countries (not yet committed to ERA PerMed)
In order to expand the circle of participants the dissemination activities will start in advance of the launch of co-funded
call. A list of stakeholders will be compiled for example: regulators, contacts from European Biopharma networks such
as European Biotechnology Networks, European Biopharmaceutical Enterprises (EBE), and European Association of
Pharma Biotechnology (EAPB). In addition, the TL will provide each CSC member with material for dissemination
through national channels.
In addition, existing platforms will be engaged in this task such as NETWATCH (http://netwatch.jrc.ec.europa.eu),
CORDIS WIRE (https://cordis.europa.eu/wire).
Task 5.2: Mid-term review seminar (Task leader: ISCIII; Contributors: CSO-MOH, FRRB, IT-MOH, UEFISCDI)
A mid-term review seminar will be organized, in collaboration with WP4, in order to provide the coordinators of the
funded consortia the opportunity to present their work and results. The results of the review seminar will be presented
in a mid-term evaluation report (D4.2).
Task 5.3: Final Symposium (Task leader: MIZS; Task co-leader: ZonMw; Contributors: CSO#MOH)
In order to enhance the visibility of the ERA#PerMed activities and strengthen the relationship with different
stakeholders in the field of personalized medicine, a symposium will be organized within this Task and in collaboration
with WP4. The subject and the format of the symposium will be decided by the Network Steering Committee (NSC). The
symposium will give visibility to and raise the awareness of all projects funded by the ERA PerMed network, not only
those of the EC co-funded call (WP2), but also those resulting from additional calls (WP6). Researchers will have the
opportunity to present their results to different stakeholders and policy makers in the field of personalized medicine. The
symposium will include researchers from Europe and beyond, so as to contribute to the notion of a transnational added
value in personalized medicine research and foster the creation of possible new consortia and new lines of research in
the field. The symposium will ideally be organized back#to#back with a pre#existing scientific conference in the area
of personalised medicine in order to increase visibility and participation.
Task 5.4: Communication and dissemination of the results of the co-funded call (Task Leader: CSO-MOH; Contributors:
IT-MoH)
Page 24 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
The results of the co-funded research projects will be disseminated in collaboration with WP4. Success stories from the
co-funded projects will be collected and published by different means (website, leaflets, dissemination to our contact
list, etc.). Submitted patents, start-up creation, and publication of high impact articles will be highlighted. A newsletter
containing the information on projects selected for funding including data on each participant and abstracts of the project
proposals will be prepared. Specific section on the ERA-Net website will be dedicated to the co-funded research projects.
Researchers' updated material as well as posters and slides from scientific networking events will also be published
with proper consent.
A final ERA-Net brochure will include the output and analysis of the results of the co-funded call. It will be published
on the ERA Net PerMed website and distributed during a final symposium.
Participation per Partner
Partner number and short name 10
18 - IT-MoH
19 - FRRB
24 - UEFISCDI
25 - MIZS
30 - ZON
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type15 Dissemination level16 Date (in
Number14
months)17
Newsletter content for
dissemination of results
D5.1 of the co-funded call 17 - CSO-MOH Report Public 14
and follow-up of funded
projects
D5.2 Final brochure content 17 - CSO-MOH Report Public 58
Description of deliverables
D5.1: Newsletter content for dissemination of results of the co-funded call and follow-up of funded projects (Month
14)
D5.2: Final brochure content (Month 58)
Milestones
M5.1: Announcement of the EC co-funded call JTC2018 (Month 3)
M5.2: Mid-term review seminar (Month 28)
M5.3: Final symposium (Month 57)
D5.1 : Newsletter content for dissemination of results of the co-funded call and follow-up of funded projects [14]
Newsletter content for dissemination of results of the co-funded call and follow-up of funded projects
D5.2 : Final brochure content [58]
Final brochure content
Page 25 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
Announcement of the EC co- Announcement of the EC co-
MS8 17 - CSO-MOH 3
funded call JTC2018 funded call JTC2018
MS9 Mid-term review seminar 1 - ISCIII 28 Mid-term review seminar
MS10 Final symposium 25 - MIZS 57 Final symposium
Page 26 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Work package number 9 WP6 Lead beneficiary 10 12 - DLR
Work package title Additional Joint Transnational Calls (JTC2019, JTC2020 and –tentatively- JTC2021)
Start month 6 End month 60
Objectives
The aim of this work package is to prepare and implement additional, non-EC co-funded Joint Transnational Calls
(JTC). The ERA PerMed partners plan to launch at least two additional calls without EC co-funding in 2019 and 2020.
The possibility of launching a third additional call in 2021 will be explored by the partners.
As ethical, legal and social aspects (ELSA) of personalised medicine form an important cross-cutting topic that is also
mentioned in the ICPerMed Action Plan, the ERA PerMed consortium will also explore the possibility of launching a
dedicated ELSA call in parallel with one of the additional biomedical calls.
In addition, the operational processes underlying ERA PerMed itself will be evaluated. The preliminary outcomes
of JTCs 2019 and 2020 will be assessed. Furthermore, the additional calls will also be monitored and their results
disseminated.
Description of work and role of partners
WP6 - Additional Joint Transnational Calls (JTC2019, JTC2020 and –tentatively- JTC2021) [Months: 6-60]
DLR
Description of work (WPL: DLR. Task leaders: ANR, CSO-MOH)
Task 6.1: Selection of call topics (additional calls) (Task Leader: ANR; Contributors: all partners participating as funders
in the additional calls)
As for the EC co-funded call important inputs for the decision on the call topics of each further call will be derived from
the SRIA, the ICPerMed Action Plan (see also description in chapters “1.1 Objectives” and “3.1 Project Plan”), the
response to previous ERA PerMed calls and other recommendations from the research community and CSC and NSC
(from the EC co-funded call JTC2018 and other non-EC co-funded calls). For each call, the Task leader will organise
the selection and preparation of the call topic by consulting the research community and by taking into account the
ICPerMed recommendations. Following the procedures described in WP2.1 for the EC co-funded call, the ERA PerMed
partners will choose the appropriate experts for a Call Advisory Board (CAB) for each additional call which will meet
to define the call topics. The final decision on the call topics will be taken by the respective CSC.
Task 6.2: Second call JTC2019 (Task Leader: ANR; Contributors: DLR, ISCIII NKFIH and all partners participating
as funders in the call)
Subtask 6.2.1: Preparation of the call. (Subtask Leader: ANR; Contributors: DLR and all partners participating as funders
in the call)
All participating funding organisations have to agree unanimously on the common procedures for the call administration
and proposal evaluation. It is planned to use the previously established criteria and procedures, which will be updated and
improved, if necessary according to the lessons learned within each JTC. The Subtask Leader (STL) will be responsible
for drafting and finalizing all necessary documents (e.g. Memorandum of Understanding (MoU), Governance and
evaluation procedures, call Pre#Announcement, Call text, Guidelines for applicants, proposal application form, etc.).
Previous versions of these documents will be used as templates, i.e. simply updated and modified for the purpose of the
additional JTC. The task leader will be responsible for collecting the signed MoUs.
Subtask 6.2.2: Establishment of the JCS and implementation of the call. (Subtask Leader: ANR; Contributors: DLR and
all partners participating as funders in the call)
The sub-task leader will set up the JCSand a CSC. The call will be published simultaneously on the ERA PerMed
website and via further dissemination channels (see sub-task 6.6.1) as well as the regular means of the participating
funding organisations (websites, newsletters, press announcements, etc.). ERA PerMed will aim to publish a call pre#
announcement to maximise the early mobilisation of the research community. The established two#step procedure as
described in WP3 will be applied, since it is best suited to deal with a high number of applications. The JCS will act as
central helpdesk to the applicants regarding all aspects of proposal drafting and submission. After proposal submission,
the JCS will be responsible for the formal check of the submitted proposals and the organisation of the applicants’
eligibility checks according to the general rules and the national/regional eligibility criteria, respectively.
Subtask 6.2.3: Peer review, project selection and national and transnational funding decisions. (Subtask Leader: ANR;
Contributors: all partners participating as funders in the call)
Page 27 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
The JCS will be responsible for the organisation and implementation of the evaluation process. A topic#specific
international Peer Review Panel (PRP) will be constituted to remotely evaluate the eligible pre-proposals and to decide
upon a final ranking of these proposals. The composition of the PRP will be based on the suggestions of the CSC. This
one will decide which pre-proposals to invite for full proposal submission, based on the remote evaluations. The number
of proposals selected for the second stage should not be higher than 2-3 times the number of proposals that could be
funded. The JCS will invite the coordinators of the selected pre#proposals to submit full proposals. The full proposals
will be remotely reviewed by the PRP and a rebuttal step is envisaged prior to the PRP meeting, i.e. coordinators of full
proposals will have the opportunity to respond to PRP reviews. The PRP will meet to discuss each proposal, taking into
account the written reviews, rebuttals and their own expertise. The PRP will prepare a final ranking list of proposals
recommended for funding. The JCS will be responsible for supplying all necessary information to the PRP and CSC
in electronic form, and for organising PRP and CSC meetings. The ranking list will be the basis for the final funding
decisions by the CSC. Following the successfully employed “virtual common pot” model, the CSC decisions will take
into account the earmarked national/regional budgets in selecting the projects to be funded. Solutions for avoiding
funding bottlenecks will be proposed and actively pursued by the participating funding organisations. The JCS will
notify the applicants of the final funding decisions and handle the feedback from the PRP review. The successful projects
will be funded by the participating national/regional funding organisations according to their respective rules. The JCS
will gather an overview of the national grants and will distribute information on administrative changes in the national
funding organisations, if necessary.
Task 6.3: Third call JTC2020 (Task Leader: DLR; Contributors: NKFIH and all partners participating as funders in
the call)
Subtask 6.3.1. Preparation of the call. (Subtask Leader: DLR; Contributors: all partners participating as funders in the
call)
Subtask 6.3.2. Establishment of the JCS and implementation of the call. (Subtask Leader: DLR; Contributors: all partners
participating as funders in the call)
Subtask 6.3.3. Peer review, project selection and National and transnational funding decisions. (Subtask Leader: DLR;
Contributors: all partners participating as funders in the call)
For the description of task 6.3.1 - 6.3.3, please refer to tasks 6.2.1 – 6.2.3. In addition, JTC2020 will take into account
the lessons learned from the previous first additional call.
Task 6.4: Fourth call JTC2021 (Task Leader: IT-MoH; Contributors: FRRB and the CSC)
The possibility of a fourth call will be explored, and the decision on this would be taken in 2020. The Subtasks would
be the same as for the call JTC 2020.
Task 6.5: Monitoring and Assessment of ERA PerMed Additional Joint Calls (Task leader: DLR; Contributors: ANR,
IT-MoH, FRRB, UEFISCDI)
Assessment of the achievements of ERA PerMed itself
The practicability of administrative and operational mechanisms used for implementation of calls, peer review, funding
of projects and scientific follow up will be monitored by the JCS. The lessons learned will fed back into the design
and implementation of the next joint calls. Thus, the evolution of robust and functional administrative and operational
practices will be facilitated. Results of this mechanistic monitoring will be incorporated in the monitoring reports for
individual calls and presented to the relevant CSC.
In addition, a continuous monitoring and evaluation of the ERA PerMed consortium itself is important. ERA PerMed
gathers funding organisations with different scopes and targets. It is therefore important to be aware of their expectations
in joining the network, and to ensure that their overall objectives are met and to implement changes in the work
programme if needed. At the start of ERA PerMed, the network will initiate a structured monitoring process of the
consortium activities. It will be carried out by the partners themselves, referring to the goals given in this ERA-Net
description of work. In a first step, the updated expectations of the consortium partners for the outcomes of the work
will be gathered in a short questionnaire. These expectations will be discussed in a small workshop to establish a mutual
understanding of the common and particular interests of partners, and indicators will be defined. The selected indicators
will be the basis for the design of the final monitoring questionnaire to gather information to know whether the initial
expectations were fulfilled or frustrated. A final monitoring report on the ERA PerMed activities will be delivered in
the end of the ERA PerMed period (D6.5). The information gathered in this task will support the preparation of the
future of ERA PerMed (WP7.3).
Follow up of the non-EC co-funded projects.
The methodology for the follow up and monitoring of ERA PerMed projects funded under JTC2019 and JTC2020 will
be the same as for the co-funded projects (WP4). Granted projects will be monitored through annual progress reports
Page 28 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
and a final report at the end of the funding period. The respective Joint Call Secretariat will be responsible for the
project follow-up. Funded project partners will also participate in midterm review seminars. These review seminars
represent an excellent opportunity for funded researchers to network, exchange information, and get a broader view of
existing research groups in Europe. As the evaluation of publicly funded projects/programmes is a strategic priority for
the funding agencies, the obligation to attend review seminars will clearly appear in the relevant call text. The complete
follow up of projects granted under the scope of the JTC 2019 and JTC2020, and the tentatively JTC2021, will not be
possible within the timeframe of ERA PerMed due to the start/duration of the projects.
Task 6.6: Communication, exploitation and dissemination of results for non-EC co#funded calls (Task leader: CSO-
MOH; Contributors: IT-MoH)
Subtask 6.5.1 Communication and dissemination on the calls JTC2019#2021
Subtask 6.5.2 Communication and dissemination of the results obtained in non-co-funded projects of JTCs 2019, 2020,
and -tentatively- 2021
Participation per Partner
Partner number and short name 10
1 - ISCIII
3 - CIHR
7 - ETAg
10 - ANR
15 - NKFIH
18 - IT-MoH
24 - UEFISCDI
27 - DS-CAT
30 - ZON
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
List of project proposals
selected by PRP, Confidential, only
recommended for for members of the
D6.1 funding by CSC and 10 - ANR Report consortium (including 24
funded by national and the Commission
regional funders the JTC Services)
2019
List of project proposals
selected by PRP, Confidential, only
recommended for for members of the
D6.2 funding by CSC and 12 - DLR Report consortium (including 36
funded by national and the Commission
regional funders the JTC Services)
2020
Report on the midterm
D6.3 10 - ANR Report Public 56
assessment of ERA
Page 29 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
PerMed projects funded
under JTC2019
Monitoring report of the
D6.4 ERA PerMed additional 12 - DLR Report Public 59
non-EC co-funded call
Monitoring report of the
D6.5 10 - ANR Report Public 48
ERA PerMed activities
Description of deliverables
D6.1: List of project proposals selected by PRP, recommended for funding by CSC and funded by national and
regional funders the JTC 2019 (Month 24)
D6.2: List of project proposals selected by PRP, recommended for funding by CSC and funded by national and
regional funders the JTC 2020 (Month 36)
D6.3: Report on the midterm assessment of ERA PerMed projects funded under JTC2019 (Month 56)
D6.4: Monitoring report of the ERA PerMed additional non-EC co-funded calls (Month 59)
Milestones
M6.1 Launch of the JTC2019 (Month 15)
M6.2 Launch of the JTC2020 (Month 27)
M6.3 Decision go/no go of the JTC2021 (Month 32)
D6.1 : List of project proposals selected by PRP, recommended for funding by CSC and funded by national and
regional funders the JTC 2019 [24]
List of project proposals selected by PRP, recommended for funding by CSC and funded by national and regional
funders the JTC 2019
D6.2 : List of project proposals selected by PRP, recommended for funding by CSC and funded by national and
regional funders the JTC 2020 [36]
List of project proposals selected by PRP, recommended for funding by CSC and funded by national and regional
funders the JTC 2020
D6.3 : Report on the midterm assessment of ERA PerMed projects funded under JTC2019 [56]
Report on the midterm assessment of ERA PerMed projects funded under JTC2019
D6.4 : Monitoring report of the ERA PerMed additional non-EC co-funded call [59]
Monitoring report of the ERA PerMed additional non-EC co-funded call
D6.5 : Monitoring report of the ERA PerMed activities [48]
Monitoring report of the ERA PerMed activities
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
MS11 Launch of the JTC2019 10 - ANR 15 Launch of the JTC2019
MS12 Launch of the JTC2020 12 - DLR 27 Launch of the JTC2020
Decision go/no go of the Decision go/no go of the
MS13 18 - IT-MoH 32
JTC2021 JTC2021
Page 30 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Work package number 9 WP7 Lead beneficiary 10 18 - IT-MoH
Strategic supporting activities to ensure relevance, impact and sustainability of ERA
Work package title
PerMed work
Start month 1 End month 60
Objectives
This work package will reach out to and engage with stakeholders in related initiatives and patient organisations in order
to support the achievement of the ERA PerMed’s main objectives. In particular, this work package seeks to develop
relationships and linkages with relevant initiatives to maximise the contribution of ERA PerMed’s contribution and
impact on the advancement of personalized medicine in Europe. Within this broader PerMed community, a framework
for the long term sustainability of ERA PerMed will be developed as a second objective to this work package. A third
objective pertains to the outreach and engagement of patient groups and representatives to ensure relevance and an
appropriate patient-oriented focus to the work of the ERA PerMed. These tasks will be performed together with the
WP1/coordination. Aims and tasks will be implemented in cooperation with ICPerMed.
Description of work and role of partners
WP7 - Strategic supporting activities to ensure relevance, impact and sustainability of ERA PerMed work
[Months: 1-60]
IT-MoH
Description of work (WPL: IT-MoH. Task leaders: ISCIII, DLR, ANR, ZonMw, Genome BC)
Task 7.1: Relationship with end users and patient representatives (Task leader: ZonMW; Contributors: CHIR, HRB,
Genome BC, MSA)
Successful implementation of PM will be achieved only if all stakeholders, including patients and citizens, are
empowered and develop the required awareness of PM. Public engagement in PM can be increased by enabling citizens
to become actively involved in all phases of research and development. The objective of this task is to optimise patient
(and citizen) empowerment in PM by ensuring that their perspectives and needs are represented accurately in all
applicable aspects of this ERA PerMed. In order to do so, this task focuses on the identification and implementation of
ways to involve patients’ input for international research topic prioritisation and for the evaluation of expected results
in proposed projects for future potential clinical, public health and social benefits. To facilitate this process, this task
will benefit from the unique expertise pertaining to patients’ engagement developed in Canada, on the focus recently
developed by ZonMw and by directly engaging patients’ and users’ associations.
This task is expected to:
• Identify and prepare an updated list of international/European patients’ organisations to be selected for patient
representation (Months 1).
• Identify processes in ERA PerMed in which the voice of the patient/citizen should be heard, the ways to care for that
and to prepare and propose such processes to the partners and patient representatives and implement agreed processes
in this ERA-Net and the joint calls for proposals (Months 2-10).
• Develop the means for the patient-representatives’ contribution, the impact, input, and the appropriateness of their
participation at different levels in the ERA PerMed call process and collect this information (Months 12-59).
Task 7.2: External relationship and representation with other initiatives (ESFRI, research infrastructures, EJPs, JPIs,
Other ERA-Nets) (Task leader: ISCIII; Co-leader: IT-MoH; Contributor: ANR, SMWK, MSA)
On behalf of the ERA PerMed consortium, the CU will be responsible for representation and relations of the network
towards other stakeholders, European, international and national initiatives, which have PM at their core or tackle cross-
cutting issues. The CU will be assisted in interactions and contact in this task by contributing partners and the NSC
Chair and Vice-chair, and task contributors.
This task is expected to enable:
- The improvement of decision-making processes;
- Dialogue to avoid undesired redundancies and overlapping;
- Goal-directed interactions with relevant projects and PM stakeholders at EU, CELAC, and world-wide level on PM.
- Partnering with above-mentioned stakeholders to share services and achieve common goals
These activities will reduce unnecessary overlaps with other national, European and international activities thus
maximising the efforts undertaken by ERA PerMed.
Page 31 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Task 7.3: Exploring the initiation of new partnerships in transnational funding (Task leader: FRRB. Contributor: ISCIII,
ZonMw, MSA)
All participating organisation in ERA PerMed are committed to fund research on personalised medicine. The consortium
will promote its funding activities and will encourage further national funding organisations to join the transnational
calls. On behalf of the ERA PerMed consortium, the CU will be responsible for any interaction, contact and
representation and liaison with the assistance of the NSC Chair and Vice-Chair.
This task is expected to enable:
- The enlargement of the network of funding organisations;
- The consortium will promote the awareness and the necessity for cooperation and transnational funding of PM research.
These activities may reduce potential unnecessary and overlapping R&I funding, thus maximising the efforts undertaken
by the ERA PerMed.
Task 7.4: Sustainability and exploitation of results (Task leader: ANR Co-leader: ISCIII; Contributors: DLR, IT-MoH,
MSA)
In order to ensure a strategic research and innovation funding policy for the future, a mid-term sustainability plan
for the activities beyond ERA PerMed, its funding and management operation will be developed. The exchange of
knowledge and best practices among ERA PerMed partners during the project will be the basis for consolidation and
further development of the network. The tradition of ICPerMed, together with numerous national PM initiatives, forms
a solid starting point for a sustainable commitment of countries to a strategic framework programme for personalised
medicine research – an important asset in aligning European and international funding policies. A continuation beyond
ERA PerMed requires the exploration of legal possibilities and/or constraints for a self-sustained model, taking into
account existing models like Joint Programming Initiatives (EJPs), European Joint Programmes (EJPs), Article 185
TFEU Initiatives, European Economic Interest Group (EEIG), Association Sans Bout Lucrative (ASBLI), foundations
and other collaborative models as well as potential changes to be implemented in the next EU Framework Programme
(tentatively 2020 – 2027).
The task leader will be responsible for collecting the necessary information, comparing the open options with the needs
of the consortium, and preparing sustainability scenarios, the feasibility of which will be discussed within the NSC.
Participation per Partner
Partner number and short name 10
1 - ISCIII
8 - MSAE
10 - ANR
12 - DLR
14 - SMWK
30 - ZON
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
Report on patient
involvement and
D7.1 30 - ZON Report Public 54
empowerment in ERA
PerMed
Page 32 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
List of deliverables
Due
Deliverable
Deliverable Title Lead beneficiary Type 15
Dissemination level 16 Date (in
Number14
months)17
Report on external
D7.2 relations and funders 1 - ISCIII Report Public 56
engagement
Report on sustainability
R&I funding,
D7.3 10 - ANR Report Public 58
management structure for
it and operational plan
Description of deliverables
D7.1: Report on patient involvement and empowerment in ERA PerMed (Month 54)
D7.2: Report on external relations and funders engagement (Month 56)
D.7.3: Report on sustainability R&I funding, management structure for it and operational plan (Month 58)
Milestones
M7.1: Updated list of international patient organisations posted on the website (Month 3)
M7.2: Workshop on sustainability (Month 30)
D7.1 : Report on patient involvement and empowerment in ERA PerMed [54]
Report on patient involvement and empowerment in ERA PerMed
D7.2 : Report on external relations and funders engagement [56]
Report on external relations and funders engagement
D7.3 : Report on sustainability R&I funding, management structure for it and operational plan [58]
Report on sustainability R&I funding, management structure for it and operational plan
Schedule of relevant Milestones
Due
Milestone
Milestone title Lead beneficiary Date (in Means of verification
number18
months)
Updated list of international Updated list of international
MS14 patient organisations posted 30 - ZON 3 patient organisations posted
on the website on the website
MS15 Workshop on sustainability 10 - ANR 30 Workshop on sustainability
Page 33 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
1.3.4. WT4 List of milestones
Due
Milestone WP
Milestone title Lead beneficiary Date (in Means of verification
number18 number9
months)17
Establishment of
management bodies: Establishment of management
Coordination Unit bodies: Coordination Unit
MS1 (CU), Operational WP1 1 - ISCIII 1 (CU), Operational Group
Group (OG) and (OG) and Network Steering
Network Steering Committee (NSC)
Committee (NSC)
Establishment of the
Establishment of the Joint
Joint Call Secretariat
MS2 WP2 1 - ISCIII 2 Call Secretariat and the Call
and the Call Steering
Steering Committee
Committee
Launch of the EC co- Launch of the EC co-funded
MS3 WP2 10 - ANR 3
funded call, JTC2018 call, JTC2018
PRP and Independent PRP and Independent
MS4 WP3 1 - ISCIII 7
Observer established Observer established
Publication of the final
Publication of the final
MS5 funding decisions on WP3 1 - ISCIII 12
funding decisions on website
website
Approval of the list of Approval of the list of
MS6 WP4 19 - FRRB 12
indicators defined indicators defined
Approval by the
Network Steering Approval by the Network
Committee of the Steering Committee of
MS7 lesson learned and WP4 1 - ISCIII 18 the lesson learned and
recommendations recommendations by the Call
by the Call Steering Steering Committee
Committee
Announcement of the
Announcement of the EC co-
MS8 EC co-funded call WP5 17 - CSO-MOH 3
funded call JTC2018
JTC2018
Mid-term review
MS9 WP5 1 - ISCIII 28 Mid-term review seminar
seminar
MS10 Final symposium WP5 25 - MIZS 57 Final symposium
MS11 Launch of the JTC2019 WP6 10 - ANR 15 Launch of the JTC2019
MS12 Launch of the JTC2020 WP6 12 - DLR 27 Launch of the JTC2020
Decision go/no go of Decision go/no go of the
MS13 WP6 18 - IT-MoH 32
the JTC2021 JTC2021
Updated list of
Updated list of international
international patient
MS14 WP7 30 - ZON 3 patient organisations posted
organisations posted on
on the website
the website
Workshop on
MS15 WP7 10 - ANR 30 Workshop on sustainability
sustainability
Page 34 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
1.3.5. WT5 Critical Implementation risks and mitigation actions
Risk
Description of risk WP Number Proposed risk-mitigation measures
number
- Strong initial commitment from all partners -
Letter of Intent signed by the official organisation
Withdrawal of a partner WP1, WP2, WP3, WP4,
1 representative have been collected prior to
organisation WP5, WP6, WP7
submission - Experience of the Coordinator in
mediation
- Substitution a Task leader of this WP. The
Loss of leadership of WP or WP1, WP2, WP3, WP4,
2 structure based in the OG and NSC Chair and
task WP5, WP6, WP7
Vice-Chair will help in the transition
- WP content and tasks designed by the partners,
and dates for deliverables chosen to be as
feasible as possible with regard to the workload
- Experience of Coordinator to overcome
Delay or failure of a partner WP1, WP2, WP3, WP4, difficulties to deliver work package results - Many
3
to deliver work as agreed WP5, WP6, WP7 partners are involved in the consortium and may
take over a part of the work upon agreement by
the NSC - Previous experience of WP and task
leaders in working together - Careful monitoring
of WP work by the NSC
- Strong initial commitment from all partners -
Letter of commitments signed by the organisation
Budget reductions, lack of
4 WP2, WP3, WP6 representative have been collected prior to
funding from some countries
submission - Minimised by preparing the CA at an
early stage
Difficulties to agree on - Call frame has already been agreed upon by the
common procedures or partners - Large experience based on other ERA-
5 WP2, WP6
common topics for the joint Nets calls - Lessons learnt from every call will be
calls fed into planning of subsequent calls
- Earmarked national/regional budgets stated in
the Letter of Intent signed prior to submission -
Risk of funding consortia/ For the co-funded call, use of mixed model allows
6 projects for less than the WP2, WP3, WP6 the use of EC contribution to “fill the gaps” -
designated budget Increase of national budget and/or negotiations
with successful applicants - Extensive experience
in co-funded calls from other ERA-Nets
- PM call is a historic opportunity and will
therefore attract a high degree of interest from the
Low number of proposals
personalised medicine community - Appropriate
7 submitted within the joint WP2, WP3, WP4, WP6
communication and dissemination tools will be in
call for proposals
place (website, stakeholder database, distribution
list for call pre-announcements)
- Most partner institutions are equipped with
internal financial accounting and auditing
offices which have managed numerous EU
WP1, WP2, WP3, WP4, projects before - Quality and reputation of
8 Misuse of resources
WP5, WP6, WP7 partner institutions (all are public bodies, funding
agencies or ministries) - Regular audits as/if
required as per EC rules - Experience of the
institutions
Page 35 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Risk
Description of risk WP Number Proposed risk-mitigation measures
number
- Since the beginning of the preparation of this
proposal, partners have been asked whether they
Lack of partners’ would in principle be willing to join further call-
9 involvement in additional WP6 type activities - This is also stated in the Letters
calls of Intent already signed - The participation in
additional joint calls will not be limited to ERA
PerMed partners
- The progress of the additional activities will
continuously be monitored and presented at each
NSC meeting - Strong management structure with
Lack of partners’
continuous monitoring by CU, OG and Chair and
10 involvement in additional WP6, WP7
Vice-Chair of reserve funds have been secured
activities
for a more active involvement of partners in those
activities, in order to allow a flexible management
of additional activities
- High quality of the coordination team, with
possibility of interim replacement by the NSC
Incapacitation or withdrawal Chair or Vice-Chair - Replacement of the
11 WP1
of coordinator coordinator by a representative of a partner -
Strong commitment of the Coordinator and
institutional support
Page 36 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
1.3.6. WT6 Summary of project effort contribution
WP1 WP2 WP3 WP4 WP5 WP6 WP7
1 - ISCIII ✓ ✓ ✓ ✓
2 - FWF
3 - CIHR ✓ ✓
4 - FRQS (Quebec)
5 - MZOS
6 - InnoFond
7 - ETAg ✓
8 - MSAE ✓
9 - AKA ✓ ✓
10 - ANR ✓ ✓ ✓ ✓
11 - BMBF
12 - DLR ✓ ✓ ✓
13 - BMG
14 - SMWK ✓
15 - NKFIH ✓ ✓
16 - HBR
17 - CSO-MOH ✓
18 - IT-MoH ✓ ✓ ✓ ✓ ✓
19 - FRRB ✓ ✓ ✓
20 - VIAA
21 - FNR
22 - RCN
Page 37 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
WP1 WP2 WP3 WP4 WP5 WP6 WP7
23 - NCBR
24 - UEFISCDI ✓ ✓ ✓
25 - MIZS ✓
26 - CDTI
27 - DS-CAT ✓
28 - GN
29 - SRC
30 - ZON ✓ ✓ ✓
31 - TUBITAK
Page 38 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
1.3.7. WT7 Tentative schedule of project reviews
No project reviews indicated
Page 39 of 39
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
1. Project number
The project number has been assigned by the Commission as the unique identifier for your project. It cannot be
changed. The project number should appear on each page of the grant agreement preparation documents (part A
and part B) to prevent errors during its handling.
2. Project acronym
Use the project acronym as given in the submitted proposal. It can generally not be changed. The same acronym should
appear on each page of the grant agreement preparation documents (part A and part B) to prevent errors during its
handling.
3. Project title
Use the title (preferably no longer than 200 characters) as indicated in the submitted proposal. Minor corrections are
possible if agreed during the preparation of the grant agreement.
4. Starting date
Unless a specific (fixed) starting date is duly justified and agreed upon during the preparation of the Grant Agreement,
the project will start on the first day of the month following the entry into force of the Grant Agreement (NB : entry into
force = signature by the Commission). Please note that if a fixed starting date is used, you will be required to provide a
written justification.
5. Duration
Insert the duration of the project in full months.
6. Call (part) identifier
The Call (part) identifier is the reference number given in the call or part of the call you were addressing, as indicated
in the publication of the call in the Official Journal of the European Union. You have to use the identifier given by the
Commission in the letter inviting to prepare the grant agreement.
7. Abstract
8. Project Entry Month
The month at which the participant joined the consortium, month 1 marking the start date of the project, and all other start
dates being relative to this start date.
9. Work Package number
Work package number: WP1, WP2, WP3, ..., WPn
10. Lead beneficiary
This must be one of the beneficiaries in the grant (not a third party) - Number of the beneficiary leading the work in this
work package
11. Person-months per work package
The total number of person-months allocated to each work package.
12. Start month
Relative start date for the work in the specific work packages, month 1 marking the start date of the project, and all other
start dates being relative to this start date.
13. End month
Relative end date, month 1 marking the start date of the project, and all end dates being relative to this start date.
14. Deliverable number
Deliverable numbers: D1 - Dn
15. Type
Please indicate the type of the deliverable using one of the following codes:
R Document, report
DEM Demonstrator, pilot, prototype
DEC Websites, patent fillings, videos, etc.
OTHER
ETHICS Ethics requirement
ORDP Open Research Data Pilot
16. Dissemination level
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Please indicate the dissemination level using one of the following codes:
PU Public
CO Confidential, only for members of the consortium (including the Commission Services)
EU-RES Classified Information: RESTREINT UE (Commission Decision 2005/444/EC)
EU-CON Classified Information: CONFIDENTIEL UE (Commission Decision 2005/444/EC)
EU-SEC Classified Information: SECRET UE (Commission Decision 2005/444/EC)
17. Delivery date for Deliverable
Month in which the deliverables will be available, month 1 marking the start date of the project, and all delivery dates
being relative to this start date.
18. Milestone number
Milestone number:MS1, MS2, ..., MSn
19. Review number
Review number: RV1, RV2, ..., RVn
20. Installation Number
Number progressively the installations of a same infrastructure. An installation is a part of an infrastructure that could be
used independently from the rest.
21. Installation country
Code of the country where the installation is located or IO if the access provider (the beneficiary or linked third party) is
an international organization, an ERIC or a similar legal entity.
22. Type of access
VA if virtual access,
TA-uc if trans-national access with access costs declared on the basis of unit cost,
TA-ac if trans-national access with access costs declared as actual costs, and
TA-cb if trans-national access with access costs declared as a combination of actual costs and costs on the basis of
unit cost.
23. Access costs
Cost of the access provided under the project. For virtual access fill only the second column. For trans-national access
fill one of the two columns or both according to the way access costs are declared. Trans-national access costs on the
basis of unit cost will result from the unit cost by the quantity of access to be provided.
Ref. Ares(2017)5655609 - 20/11/2017
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
HISTORY OF CHANGES:
- All the Work Packages have been renamed to the official names used.
- It is clearly stated in page 6 that the funded projects must be trans-national projects
involving at least two independent entities from two different EU Member States or
Associated Countries.
- Budget for Canadian partners, except Genome BC, have been included in the table
3.4.
- For beneficiary 7, reply to in-kind contribution has been changed to NO in the table
of section 4.1.
- Beneficiary number has been included for all the partners in Section4.
- All the references to the proposal or proposed research have been deleted.
- Genome BC has been removed and their task, redistributed among the beneficiaries
in Work Package 7: “GenomeBC expertise will be fully covered by the rest of the
contributors expertise, after the dropping out from the original consortium in the
proposal”.
- Beneficiaries have been renumbered after the removal of Genome BC.
- Following instructions of the Spanish beneficiary CDTI, the Catalan Founding
Agency’s name has been changed from Catalan Ministry of Health (CAT-MoH) to
the correct one, Health Department of Generalitat de Catalunya (DS-CAT).
- The following sentence has been added to most of the the beneficiaries within the
section “Please specify the maximum amount of financial support to a third party
and the criteria for determining the exact amount under national funding rules” on
table 4.1: “Financial support will be provided according to the funding rules of
Beneficiary XXX, which can be provided by the staff members indicated above
and/or assessed here: website of the agency/ministry”.
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020-SC1-2016-2017 ERA-NET Cofund on Personalised Medicine
ERA PerMed - PROJECT NUMBER 779282
List of participants
Particip Participant Country/
Participant organisation name
ant nº short name Region
1 Coord National Institute of Health Carlos III ISCIII Spain
2 Austrian Science Fund FWF Austria
3 The Canadian Institutes of Health Research CIHR Canada
4 Quebec Research Funds – Health FRQS Canada
5 Ministry of Science and Education MZOS Croatia
6 Innovation Fund Denmark InnoFond Denmark
7 Estonian Research Council ETAg Estonia
8 Estonian Ministry of Social Affairs MSA Estonia
9 Academy of Finland AKA Finland
10 The French National Research Agency ANR France
11 Federal Ministry of Education and Research BMBF Germany
12 German Aerospace Centre e.V. – Programme
DLR Germany
Management Agency
13 Federal Ministry of Health BMG Germany
14 Saxon State Ministry for Higher Education,
SMWK Germany
Research and the Arts
15 National Research, Development and Innovation
NKFIH Hungary
Office
16 Health Research Board HBR Ireland
17 Ministry of Health, The Chief Scientist Office CSO-MOH Israel
18 Italian Ministry of Health IT-MoH Italy
19 Regional Foundation for Biomedical Research FRRB Italy
20 State Education Development Agency VIAA Latvia
21 National Research Fund FNR Luxemburg
22 Research Council of Norway RCN Norway
23 National Centre for Research and Development NCBR Poland
24 Executive Agency for Higher Education,
UEFISCDI Romania
Research, Development and Innovation Funding
25 Ministry of Education, Science and Sport MIZS Slovenia
26 Centro para el Desarrollo Tecnológico Industrial CDTI Spain
27 Health Department – Generalitat de Catalunya DS-CAT Spain
28 Government of Navarre GN Spain
29 Swedish Research Council SRC Sweden
30 The Netherlands Organisation for Health Research
ZonMw The Netherlands
and Development
31 The Scientific and Technological Research
TUBITAK Turkey
Council of Turkey
ERA PerMed 2
Abbreviations and Acronyms Associated with document Ref. Ares(2017)5690678 - 21/11/2017
CA Consortium Agreement
CAB Call Advisory Board
CSA PerMed Coordination and Support Action on Personalised Medicine
CSC Call Steering Committee
CU Coordination Unit
EC European Commission
EJP European Joint Programing
ERA PerMed ERA-Net Cofund for Personalised Medicine
ERA European Research Area
EU European Union
ICPerMed International Consortium on Personalised Medicine
IPR Intellectual Property Rights
JCS Joint Call Secretariat
JPI Joint Programming Initiative
JTC Joint Transnational Call
KPI Key Performance Indicator
MoU Memorandum of Understanding
Net Network
NSC Network Steering Committee
OG Operating Group
PI Principle investigator
PerMed Personalised Medicine
PM Personalised Medicine
PRP Peer Review Panel
R&D Research and Development
R&I Research and Innovation
RTD Research, Technology and Development
SRIA Strategic Research and Innovation Agenda
STL Subtask Leader
TL Task Leader
UC Unit Cost
UN United Nation
WHO World Health Organisation
WP Work Package
WPL Work Package Leader
WS Workshop
ERA PerMed 3
Table of contents Associated with document Ref. Ares(2017)5690678 - 21/11/2017
LIST OF PARTICIPANTS............................................................................................................................................ 2
ABBREVIATIONS AND ACRONYMS .......................................................................................................................... 3
1. EXCELLENCE ................................................................................................................................................... 4
1.1 OBJECTIVES .................................................................................................................................................. 4
1.2 RELATION TO THE WORK PROGRAMME ........................................................................................................ 5
1.3 CONCEPT AND METHODOLOGY ..................................................................................................................... 6
1.4 AMBITION ................................................................................................................................................... 10
2. IMPACT ............................................................................................................................................................ 11
2.1 EXPECTED IMPACT ...................................................................................................................................... 11
2.2 MEASURES TO MAXIMISE IMPACT............................................................................................................... 16
3. IMPLEMENTATION ...................................................................................................................................... 18
3.1. PROJECT PLAN ............................................................................................................................................. 18
Table 3.1 a: Work packages description ..................................................................................................... 3719
Table 3.1 b: List of work packages ................................................................................................................. 37
Table 3.1 c: List of Deliverables ..................................................................................................................... 37
3.2 MANAGEMENT STRUCTURE AND PROCEDURES .......................................................................................... 38
3.2.1 ORGANISATIONAL STRUCTURE ............................................................................................................... 38
Table 3.2 a: List of milestones ........................................................................................................................ 41
3.2.2 RISK ASSESSMENT....................................................................................................................................... 41
Table 3.2 b: Critical implementation risks...................................................................................................... 42
3.3 CONSORTIUM AS A WHOLE ......................................................................................................................... 43
3.4 RESOURCES TO BE COMMITTED ........................................................................................................ 43
Table 3.4 a: Summary of national/regional call contributions .......................................................................... 44
Table 3.4 b: Summary of Work Package participation and number of years with coordination costs .............. 44
4. MEMBERS OF THE CONSORTIUM………………………………………………………………...…48
5. ETHICS AND SECURITY………………………………………………………………………………118
ERA PerMed 4
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
1. Excellence
1.1. Objectives
The Horizon 2020 Advisory Group has defined Personalised Medicine as "a medical model using characterization
of individuals’ phenotypes and genotypes (e.g. molecular profiling, medical imaging, lifestyle data) for tailoring the
right therapeutic strategy for the right person at the right time, and/or to determine the predisposition to disease
and/or to deliver timely and targeted prevention". Personalised Medicine (PM) represents a paradigm shift away
from a ‘one size fits all’ approach to the treatment and care of patients with a particular condition, to one which uses
emergent approaches in areas such as diagnostic tests, functional genomic technologies, molecular pathways, data
analytics and real time monitoring of conditions to better manage patients’ health and to target therapies to achieve
the best outcomes in the management of a patient’s disease or predisposition to disease. At the same time, one key
objective of personalised medicine is to make health systems more sustainable by reducing costs.
In the face of this potential huge leap forward, the fact that personalised medicine lacks the cooperation and
coordination needed to reorganise the still very fragmented field is a severe drawback to its development. In this
regard, major efforts must be directed towards creating the conditions for coordinating and aligning relevant
stakeholders (public institutions, governments, industry, civil society, patient organisations) in personalised medicine
action across Europe and beyond.
In order to reach this goal of advancing PM, the International Consortium for Personalised Medicine (ICPerMed)
was established in November 2016. The main purpose of ICPerMed is to boost personalised medicine by an enhanced
coordination and alignment of research activities and an investigation of its benefits to citizens and healthcare
systems. ICPerMed members developed an Action Plan1 in this field, building on the Strategic Research and
Innovation Agenda (SRIA) "Shaping Europe's Vision for Personalised Medicine"2 which has been developed and
published by the CSA PerMed in June 2015. ICPerMed will not directly fund research or launch calls for proposals.
However, with the Action Plan, ICPerMed designed a blueprint for a coordinated approach for personalised medicine
research and the reasonable implementation of innovative and promising approaches in the health systems. ICPerMed
members will implement elements of this blueprint within their national or regional funding activities. The Action
Plan will also be used for new transnational funding activities, such as for helping topic definition under ERA
PerMed.
Based on this background, this ERA-Net Cofund ERA PerMed will establish a close link with ICPerMed and foster
the implementation of the Action Plan by funding transnational research projects in the field of personalised
medicine. Moreover, ERA PerMed aims to align national research strategies and funding activities, promoting
excellence, reinforcing the competitiveness of European players in PM and enhance the European collaboration with
countries outside the EU.
ERA PerMed: specific objectives for the project
The ERA-Net Cofund (hereinafter ERA PerMed) will coordinate research efforts of the participating partners and
third countries in the field of personalised medicine. The main focus of ERA PerMed is to plan, implement, monitor
and disseminate up to four joint transnational calls (JTC) to fund multidisciplinary research projects. Additional
regional and national funding agencies will be invited to join the planned JTCs to complement and further strengthen
the current consortium. In line with the rules of ERA-Net Cofund, ERA PerMed partners commit themselves to
implement one call with EC top-up funding, which will further increase the expected impact of the ERA PerMed
funding activity.
Additionally, up to three non-EC co-funded calls and further activities will be carried out in ERA PerMed, in order
to broaden the scope of the action and to sustain the efforts made by the national/regional funding organisations and
the EC. A permanent dialogue with European stakeholders will also be established in order to take into account
changes in the area of personalised medicine that occur during the ERA PerMed action, e.g. new developments in
emerging technologies or societal challenges, as identified in the Strategic Research and Innovation Agenda
1
The ICPerMed Action Plan is published on: http://www.icpermed.eu/
2
The CSA PerMed SRIA is published on http://www.permed2020.eu
ERA PerMed 4
Associated
(SRIA) in Personalised Medicine, the Action Plan of ICPerMed with further
and document Ref. Ares(2017)5690678
strategic activities - within
21/11/2017
ICPerMed.
Cooperation with initiatives such as ICPerMed is crucial for both prioritising research topics and implementing
research results. Early involvement of experts from all related areas is one of the prerequisites for successful results.
Overarching Coordinate National and Regional research funding programmes in Personalised Medicine
Goal
Specific Launch a EC co-funded call to fund innovative transnational research projects in
objectives personalised medicine
Launch up to three joint transnational calls without EC co-funding to support further
multidisciplinary transnational research projects in line with the strategic priorities
identified during the life of the project
Monitor the progress of the funded projects and analyse the outcome of the joint calls
Establish a permanent dialogue with PM global stakeholders
Increase the participation of the industrial sector in PM activities
Consortium 31 funding organisations engaged in establishing this unparalleled change towards
an optimal coordination of PM in Europe: the combination of major countries
involved in the new concept of care as well as smaller countries, regions and non-
for-profit research funding organisation is unique in the context of ERA-Net scheme
and emblematic of the high interest transnational funding of PM. The external
dialogue with the main stakeholder will mitigate the risk to accomplish outdated or
sterile activities
The role and commitment of the European Commission (EC) in the co-funded call
will provide to all the interested organisation the proof of the importance of unifying
efforts and resources for a common challenge
ISCIII provides solid references to all the involved partners of the good
implementation of the Project
The consortium will communicate and disseminate projects results and ERA PerMed
activities to create awareness and increase the visibility of the personalised medicine
research community
Ensure that the researchers follow the Responsible Research and Innovation
principles
Main Prepare and launch of the EC co-funded call
project Liaise with ICPerMed and select the main areas of work for ERA PerMed
activities Select the topic and implement the co-funded call
Evaluate & Assess the results of the 1st JTC
Prepare and launch up to 3 additional JTCs
Enlarge the PM stakeholder basis
Main High-impact scientifically excellent transnational R&D projects on PM have
project been/are being funded
outcomes Research programmes and policies on PM have been aligned in Europe and Canada
Relevant stakeholders including industry have become involved in PM activities
1.2. Relation to the work programme
ERA PerMed directly responds to the challenges set out in the scope and objectives of call SC1-HCO-03-2017,
Work Programme 2016 – 2017, of Health, Demographic change and well-being of the Societal Challenge 1 (SC1),
pillar III of the Horizon 2020. PM is a research priority to be implemented within the Work Programme and the ERA-
Net Cofund instrument will serve this purpose. The project will serve the goal of the call by implementing high-
quality PM research at European level in line with national, regional and European strategies.
ERA PerMed 5
The ERA PerMed consortium will launch up to four Joint Transnational Associated
Callswith document
(JTCs), by Ref. Ares(2017)5690678
supporting - 21/11/2017
research projects
in the field of PM in the framework of the Roadmap and Action Plan of ICPerMed. All the funded projects will be
trans-national projects involving at least two independent entities from two different EU Member States or Associated
Countries.
In this context, ERA PerMed goes beyond the efforts made in ICPerMed by organising up to four joint transnational
calls (including one co-funded by the EC), enlarging the consortium, establishing relations with other initiatives in
the field of PM, putting in place activities towards creating favourable conditions for an increased application of
projects results in clinical care and their potential translation into industrial medical products.
The ERA PerMed consortium comprises 31partners from 22 countries (Member States, Associated Countries to
Horizon 2020 and two partners from Canada: the Canadian Institutes of Health Research (CIHR) and the Fonds de
Recherche du Québec – Santé (FRQS)). ERA PerMed will pool the resources that are available for transnational
collaboration on PM research and innovation from all its partners for a EC co-funded call with minimum total call
budget of 23,740,000 € total partner country/region commitment. This EC co-funded call will be prepared and
launched (WP2) according to the selection procedure and guidelines of the EC (WP3). ERA PerMed partners agreed
to use the SRIA of the CSA PerMed with its 5 challenges (Challenge 1 – Developing Awareness and Empowerment,
Challenge 2 – Integrating Big Data and ICT Solutions, Challenge 3 – Translating Basic to Clinical Research and
Beyond, Challenge 4 – Bringing Innovation to the Market, Challenge 5 – Shaping Sustainable Healthcare) for
selecting the call topic. Communication and dissemination of the information on the co-funded call and its research
projects and results therefore will be attained by using the ERA-Net website and social media (WP5 in cooperation
with WP4 and WP3). The progress of the funded projects will be monitored, assessed and disseminated. These
monitoring and assessment activities will be based on the development of specific key indicators (WP4).
1.3. Concept and methodology
Background on the development of European PM activities
In order to explore the current state of research and implementation of PM in Europe, DG RTD's Health Directorate
of the European Commission (EC) organised several workshops with representatives of ministries and funding
agencies from the European Union (EU) Member States (MS) and Associated Countries to Horizon 2020. These
workshops revealed that PM relevant research and implementation efforts are already on-going in many European
MS and regions. They showed the high interest in increasing information exchange as well as the necessity for more
dialogue and collaboration. However, they also showed that PM research and implementation are uneven across and
within sectors, regions and countries. The workshops therefore concluded advancing PM in Europe would require
much closer collaboration between research funders and that a model for this collaboration should be further
explored.
Essential and strategic groundwork for this collaboration was prepared and established by the CSA PerMed, a
Coordination and Support Action (CSA, September 2013 - August 2015, GA 602139, www.permed2020.eu). The
CSA PerMed consortium consisted of 27 partners representing key decision makers in research and research policy,
industry, healthcare and patient organisations. Together, they generated a Strategic Research and Innovation Agenda
(SRIA) that formulates recommendations for research funders to overcome the most important challenges that the
implementation of PM is facing today.
The International Consortium for Personalised Medicine (ICPerMed) stemmed from this previous work of CSA
PerMed and the SRIA. The goal is to develop ICPerMed into an international and sustainable platform for
collaboration and exchange between funders and stakeholders. The first activities of ICPerMed have been the PM
Congress in June 2016 and the publication of an Action Plan for PM-related research suggesting actionable research
items in March 2017 (http://www.ICPerMed.eu/).
The ICPerMed initiative brings together health research funders and policy-making organisations from 29 countries,
three regions and the European Commission (EC). Current ICPerMed bodies are: (1) The Steering Board, including
a chair and two vice-chairs, the challenge group facilitators as well as the members of the ICPerMed Secretariat. (2)
The Executive Committee, including the Steering Board and participating members and observers.
ERA PerMed 6
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ICPerMed Secretariat (November 2016 - October 2020, GA 731366 http://www.icpermed.eu/) was established as a
coordination and support activity for an efficient management, organisational, logistical and communication support
for day-to-day management of the of ICPerMed initiative. As PM research is highly complex in its divers and
numerous stakeholders and fragmentation is high, support is also given in gathering, mapping, monitoring and
analysing data on PM research and implementation effort in Europe and beyond. The ICPerMed Secretariat officially
started its work on November 1st 2016 and is coordinated by DLR, with ANR, IT-MoH and ISCIII as partners. All
these institutions are also partners of ERA PerMed.
ERA PerMed will organise its activities in cooperation with ICPerMed and take particular attention to avoid any
overlapping and to promote complementarities.
Part A: Activities related to the co‐funded Joint Transnational Call (JTC2018) and the consortium Management
ERA PerMed comprises 31 partners from 22 different countries; however, further partners have already
expressed interest in joining the initiative later. The management structures will be designed to ensure
efficient collaboration between funding organisations of European Union and associated countries to Horizon
2020 and third partner countries (WP1). The ERA PerMed website will be made available from project
launch and it is planned to be crosslinked with the ICPerMed webpage (http://www.icpermed.eu/).
The EC co‐funded call will be organised in 2018 (JTC 2018, WP2 and WP3). Submitted als will be evaluated
based on their scientific excellence and impact. This call will combine budget contributions from the
participating national/regional funders and the EC in order to maximise its impact. Up to date, the ERA
PerMed partners have indicated their intention to fund personalised medicine research and innovation
projects with 23,740,000 €.
The EC co‐funded projects will be followed up and their results assessed as described under WP4.
Communication and dissemination efforts form important aspects of the JTC, as they will increase the
participation of the PM community in the co-funded call. Dissemination activities to promote research results
and their impact will be central to translating knowledge to the research community, to key stakeholders as
well as to the general public (WP5).
Part B: Additional activities
In the years following the co-funded call (JTC2018) up to three additional non-EC-co-funded Joint Transnational
Calls (JTCs) are planned (JTC 2019-2020 and -tentative- JTC2021 in WP6). Although it is ambitious to organise
this number of calls for a newly set up ERA-Net, the ERA PerMed consortium is confident that this is feasible,
however dependent on the final budget available for these additional activities.
The monitoring activities already mentioned under Part A will also be extended beyond the EC co‐funded call
JTC2018, and its funded projects monitored by WP4. The follow-up and assessment of the funded consortia/projects
under the umbrella of the additional non-EC co-funded calls of ERA PerMed (at least mid-term reports) will also be
carried out by WP6. Similar to the co‐funded call, the additional projects will be monitored using the list of indicators
and monitoring tools established in WP4.
Strengthen the communication and interaction between different PM stakeholders is vital for increasing public
awareness and importance of PM research. The objective of WP7 is therefore to foster such interaction and to
strengthen the relationship between patient, research community and other relevant initiatives and stakeholders.
With respect to sex and gender balance issues, ERA PerMed aim to address these in PM research by incorporating
them fully into the call topics. Furthermore, gender issues will be one of the indicators for the assessment of the
funded projects in all Joint Transnational Calls (JTCs). Concerning the ERA PerMed activities themselves, the Peer
Review Panel (PRP) will be gender balanced as far as possible.
How sex and/or gender analysis is taken into account in the project’s content.3
3
References:
ERA PerMed 7
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Despite national and EU-level strategies on gender equality, European research still suffers from a considerable loss
and inefficient use of highly skilled women. The annual increase in female researchers is less than half the annual
number of female PhD graduates and too few women are in leadership positions or involved in decision-making. On
the other side, the integration of a gender dimension into the design, evaluation and implementation of research is
also still too limited. In this respect, the challenge is to increase the quality and relevance of research.
From the science based medical research point of view, in a recent report (2014) published by researchers at the
Brigham and Women’s Hospital in Boston, they chronicled the exclusion of women from health research and its
impact on women’s health: The science that informs medicine – including the prevention, diagnosis, and treatment
of disease – routinely fails to consider the crucial impact of sex and gender. This happens in the earliest stages of
research, when females are excluded from animal and human studies or the sex of the animals isn’t stated in the
published results. Once clinical trials begin, researchers frequently do not enrol adequate numbers of women or,
when they do, fail to analyse or report data separately by sex. This hampers our ability to identify important
differences that could benefit the health of all4.
Both the gender spheres (Gender biases of researchers and scientists and imbalances in evidence-based medical
research) will be addressed in ERA PerMed.
Finally, in the public consultation launched by the EC in 2012 and titled “Areas of untapped potential for the
development of the European Research Area -Analysis of the response to the ERA Framework public consultation”,
where expert scientists and researchers, governmental organisations and other stakeholders were called to express
their opinion about the main factors that might slow the progress in achieving gender balance in research. The results
are summarised in the following figure:
Figure 1: Factors accounting for the slow progress in achieving gender balance and integrating the gender
dimension in research
1. Wroblewski, A; Buchinger, B; Schaffer, N. (2015). Cultural Change Towards a Gender-Neutral Landscape in Science, Academia and Research in
2025, Reihe Soziologie, 106, Vienna: IHS.
2. European Commission, Directorate-General for Research and Innovation, Directorate B – Open Innovation and Open Science , Unit B.7 Science with
and for Society (2015), She figures.
3. Johnson, P A.; Fitzgerald, T; Salganicoff, A; Wood, S. F.; Goldstein, J. M (2014), Sex Specific Medical Research – Why women’s health can’t wait;
4. European Commission, Directorate-General for Research and Innovation European Research Area, (2012), Areas of untapped potential for the
development of the ERA - Analysis of the response to the ERA Framework public consultation
4
Report:http://www.brighamandwomens.org/Departments_and_Services/womenshealth/ConnorsCenter/Policy/ConnorsReportFINAL.pdf
ERA PerMed 8
Associated
Based on these assumptions, the ERA PerMed consortium has compiled withof
a list document
actionsRef. Ares(2017)5690678
to be - 21/11/2017
undertaken during
the Action:
Nr Name of the Action Description Level of
Impact (Low,
Medium,
High)
1. Include gender The review process and quality assessment criteria will be Medium
dimension in the peer adapted and priority will be given to anchoring mandatory gender
review process criteria in the award process. This will extend not only to the
gender distribution in research teams, but also to the inclusion of
gender aspects in the research itself, both of which should be
explicitly addressed in the application process. Adherence to such
requirements should be a mandatory criterion for funding
applications.
2. Development of The assessment of scientific and academic excellence should be High
alternative assessment based more strongly on quality than on quantity, whereby
criteria interdisciplinary/transdisciplinary cooperation and approaches
should be seen as particular indications of quality. The criteria
currently used to assess scientific and academic output – of
individual scientists, academics, institutions or research projects
– are considered unfit, because they are based primarily on
quantitative indicators, tie up resources and are fairly
meaningless.
3. Gender aspects will This higher level of obligation is illustrated to include gender Low
be part of the competence as a “must have” qualification in decision-making
workshops and posts.
symposiums
organised within
ERA PerMed
(training the members
of the call steering
committee on the
specific issues)
4. Gender Equality Incentivise the creation of GEPs among the ERA-Net RFOs and High
Plans among the funded RPOs by organising an annual workshop on
of benefits of gender equality action on Academia, scientist and
Healthcare systems as a whole.
NB: A stable link will be established with the Gender ERA-Net and experiences from projects such as TARGET
(Taking a Reflexive approach to Gender Equality for institutional Transformation) of which FRRB is part, will be
used by the consortium. This will lead to a higher level of knowledge and an efficient use of resources. Finally, to
ensure a strategic research funding policy for the future, a sustainability plan for activities is to be established.
Responsible Research and Innovation aspects
ERA PerMed wants to promote not only excellent research but also socially desirable science and technology: it is
vital to align the objectives of research processes with the needs and values of the societies that support them. There
is clear evidence that today we need to involve the whole of society in the decisions about the development of science
and technology so we can all contribute to the smart, sustainable and inclusive growth of our societies.
In line with some of the most important agendas, ERA PerMed tends to include ethical acceptability, sustainability
and social desirability of research outcomes, the compliance of research integrity in a global context, the achievement
of gender equality, and the wider involvement of society in opening the science and technology system.
ERA PerMed 9
Associated
The main RRI principles we address the challenge through the following with document Ref. Ares(2017)5690678 - 21/11/2017
priorities:
Topic Description Actions to be implemented in the WP
project
Promote the Ensuring that R&I meets the needs and Inclusion of RRI training session within 1, 5,
incorporation of desires of the PM means drawing upon a the workshops and symposium organised 7
RRI principles range of governance agendas. These within the Action
in funding principles must be therefore be promoted
organisations at institutional level and incorporated
within the decision making process of
funding organisations.
Incorporate the Guaranteeing research integrity, open - Setting priorities with stakeholders: 3,4,
RRI principles access scientific results are crucial for within the CSC a multi-stakeholder 6, 8
in the JTCs properly embedding science in society. In dialogue will be promoted and organised
a context of global societal challenges by the funders themselves prior to setting
such as PM, broader societal involvement research goals in specific funding calls.
in R&I is needed to collaboratively
- Choose evaluation criteria which
reflect on the future we aspire to as
integrates the RRI principles
societies.
- Monitor the funded projects from the
point of view of the impacts on the society.
Foster the Setting up a participatory research and Elements of RRI that might surface within 1
inclusion of the innovation agenda has multiple the implementation of ERA PerMed which
RRI in the SRIA advantages: apart from helping to will feed the discussion in the Executive
PerMed agenda identify stakeholders’ unmet needs it also Committee of ICPerMed in order to
and Roadmap helps researchers include new process these inputs and develop
perspectives in research, prepare appropriate answers.
stakeholders for the research process,
structure the process for broader
collaboration between stakeholder
groups.
1.4. Ambition
The implementation of personalised medicine is a major objective in Europe and beyond. This initiative aims to
engage and work with stakeholders and organisations, regionally, nationally and internationally, to support effective
translation of research findings into benefits for health systems.
International institutions, such as the United Nations (UN) and the World Health Organization (WHO, its technical
agency for health), can give powerful leadership to national institutions to ensure a greater knowledge of the existence
of new technology, its value to the delivery of efficient healthcare, its significant contribution to the general
improvement of public health, social benefits and to the overall cost-effectiveness of this new therapy.
However, to achieve progress in any major public health initiative, such as PM, it is essential to have committed and
widespread support from political and international institutions. In the EU, where the science and technology
underpinning PM has been progressing at a fast pace, there are also supporting laws on clinical trials, medical devices,
and personal data protection now in place to help bring treatment to the patient more quickly. While there is currently
a lot of optimism around PM, much still remains to be done to turn its potential into reality.
ERA PerMed 10
ERA PerMed aims to facilitate the use of the increasing knowledgeAssociatedbase
with document Ref. Ares(2017)5690678
and infrastructure, and to -thereby
21/11/2017
significantly driving the further development and implementation of PM.
2. Impact
The ultimate goal and expected outcome of ERA PerMed is to strongly contribute to the building of a more effective
European Research Area by facilitating and coordinating regional and national European research funding
programmes on PM between EU Member States, Associated Countries to Horizon 2020 and Third Countries,
including the EC (for the EC co-funded joint transnational call).
ERA PerMed wants to contribute to the overarching goal of PM which is to put the citizen at the centre of healthcare
and to prevent diseases instead of only treating them, reducing the cost of healthcare and creating a virtuous circle
for health policy.
At a European level, this integrative process requires better coordination and combination of limited resources of the
countries. With an improved use of European funding resources, the unique strengths that Europe offers -namely
excellent basic research leading to outstanding scientific discoveries- could more readily be converted into medical
inventions, including innovative medicinal products and services capable of preventing diseases to appear and
boosting European healthcare and competitiveness in the medical sector. ERA PerMed brings together an exceptional
consortium of major European funding organisations that has grown in the last years, that shares a common aim and
strong commitment to accelerate the translation of scientific discoveries into clinical applications and to increase the
quality of PM research. All partners are key actors in their national and regional research funding systems. They
bring considerable expertise and funding volumes into the ERA PerMed consortium.
ERA PerMed is considered one of the main tools to reach the goals of the ICPerMed Action Plan on personalised
medicine. With its open structure, it will bring European priorities to the centre of global discussions on a very
challenging topic. In addition to the countries/regions already represented in the current consortium, ERA PerMed
aims to bring together new countries, resources and knowledge. The project addresses four different types of
stakeholders for different purposes: 1) Research funding organisation – to enable the implementation of international
research projects; 2) Public entities who manage national and regional research programmes, to increase the
commitment and PM competence to support policy in their institution; 3) Policy makers, to increase awareness and
open up outdated or weak PM policies to change; 4) Researchers and the scientific community, to create better access
to new approaches to develop and analyse PM.
The overall expected impact of ERA PerMed is a thorough, lasting and forward-looking alignment of current
European (and Canadian) funding organisations with the goals of creating synergies and coherence in personalised
medicine at national and regional level. Personalised medicine is an interdisciplinary field that will drive the health
research and innovation agenda for years to come. Research and innovation in this vast area is moving rapidly but it
is a fragmented field. Even in areas such as cancer or rare diseases, the implementation of personalised medicine in
healthcare is slow. One reason is the lack of evidence that is needed to demonstrate the benefit of this approach to
citizens and healthcare systems.
The implementation of personalised medicine requires consolidation of clinical and diagnostic data held about an
individual and cross comparison (using data gathered about other individuals) to identify patterns in disease and
response to disease, allowing more robust conclusions about diagnosis and treatment to be made. Data gathering is
indeed one key aspect, it will allow to inform the selection of the most appropriate treatment for individual patients
– the right drug at the right time, earlier screening and treatment, smarter monitoring and adjustment of treatments.
2.1 Expected impact
Synergies and coherence in key fields of personalised medicine research at national and regional level
Cooperation among the partners is essential to build a strong personalised medicine research community as most of
the partners do not yet have dedicated national programmes in this field. The idea is to integrate emerging national
ERA PerMed 11
Associated
activities directly into a coordinated European effort, thereby avoiding with document
fragmentation andRef. Ares(2017)5690678
duplication - 21/11/2017
of efforts from
the beginning. ERA PerMed gathers a highly committed consortium which will contribute to:
- Stimulating future research by implementing joint transnational calls in a synergistic manner
- Building networks and strengthening the PM community in Europe through dedicated workshops,
awareness-raising events and the use of different communication channels
- Monitoring of the ERA PerMed activities will provide valuable feedback for national and transnational
research policies. Analysis and assessment of the funded projects and the other activities performed by ERA
PerMed will represent an information source of the networking of the European and Canadian personalised
medicine researchers.
Impact on personalised medicine in Europe
PM has only just begun to have a tremendous impact on Europe’s health care systems, biomedicine research and
industrial sector. Nevertheless, it has become clear that future clinical care will be based on treatment tailored to a
patient’s unique molecular disease context. Since PM has so far been applied in limited areas only, and without
transnational coherence, more efforts and closer partnerships between EU countries are required in order to achieve
significant improvements, and to increase the efficiency and pace towards true European Research Area (ERA) in
PM. The joint implementation of a transnational funding EC co-funded call of 23,740,000 € (committed by the
partners) is expected to have a positive impact on the work towards this goal.
Dissemination of activities and outreach to all PM actors (research community, health care system, industrial sector,
clinicians and civil society) is envisaged (WP5). Moreover, it is intended to develop ERA PerMed into a central
personalised medicine hub that links the research community in the field. The cooperation with ICPerMed and other
existing initiatives such as IMI, JPIs, EJPs, ERICs and other ERA-Nets is crucial. ERA PerMed will act as a pivotal
point for different actors in order to:
- Bring scientists together and foster interdisciplinary research and innovation. This will result in better and
wider collaboration between the areas relevant for personalised medicine, such as biomedicine, data
management, health economy and other related disciplines
- Take an interdisciplinary approach to PM research
- Bring together European, Canadian national and regional policy initiatives in the area of PM
- Offer networking, funding, advice and dissemination possibilities on these different levels in order to make
the most of the resources available.
Impact on a global scale
The ERA PerMed consortium includes third countries outside Europe in their calls. Two Canadian funding
organisations participate in the consortium. The Canadian Institutes of Health Research (CIHR) and The Fonds de
recherche du Québec – Santé (FRQS), which cover Canada as a whole.
Canada has proven to be a reliable and important partner in many ERA-Nets related to health research (E-Rare-3,
Neuron-3, JPco-fuND, JPI-EC-AMR). In addition, big national funding efforts have already been undertaken in PM,
shaping a strong scientific community in the field. A strong impact for ERA PerMed can therefore be expected, with
European partners profiting from Canadian know-how and vice versa.
The ERA PerMed partners consider the three international partners as a starting point for an internationalization
process within the consortium. The Coordination Unit (CU) together with WP7 (Strategy) will strive to enlarge the
network and include new funding organisations in the planned joint calls. This activity will benefit from the
international networks of other ERA-Nets in which ERA PerMed partners are involved and from the international
contacts of individual partners. Currently, the CU is working on exploring the interest of additional funders to join
the calls launched under ERA PerMed.
ERA PerMed 12
Impact beyond the duration of ERA PerMed Associated with document Ref. Ares(2017)5690678 - 21/11/2017
The ERA PerMed initiative is considered to be a well-established network considering the background offered by
ICPerMed and the former CSA PerMed. Nevertheless, the ERA PerMed consortium envisages a self-sustained long-
term European programme of co-operation for joint funding in PM as the next level after the end of the initiative.
Therefore, under Task 7.3 “Sustainability and exploitation of results” a joint strategy will be developed which
describes the activities planned for developing the business plan, instruments and existing possibilities for continuing
with PM activities. The sustainability plan will be developed in cooperation with existing initiatives related to PM
and Health Research. The exchange during the ERA-Net cofund implementation for ERA PerMed knowledge and
best practices among partners will be the basis for consolidation and further development of the network. The creation
of ICPerMed together with numerous national PM initiatives puts solid grounds for the sustainable commitment from
countries towards a strategic framework programme for PM research.
A continuation beyond ERA PerMed requires the exploration of legal possibilities and/or constraints for a self-
sustained model, taking into account existing models like European Joint Programmes (EJPs), Article 185 TFEU
Initiatives, Joint Programming Initiatives (JPIs), and other collaborative models as well as potential changes to be
implemented in the next EU Framework Programme (tentatively 2021 – 2027). ERA PerMed partners expect to
maintain the momentum generated by this initiative and to extend its impacts sustainably after the end of the project.
In a nutshell, ERA PerMed will provide a clear perspective for PM stakeholders, who will find tailor-made support
at the level of information, communication, networking and funding according to their needs. In turn, it is expected
that ERA PerMed will help to maintain Europe’s highly competitive position in personalised medicine worldwide.
Sharing good practices in implementing common research programmes
ERA PerMed will contribute to the improvement and harmonisation of public policies which aim to support
collaborative research projects between academics, industry, companies/SMEs and/or hospital/health care settings.
It aims at achieving a deepened and extended coordination of national and transnational research in the field of
personalised medicine. Streamlined national/regional and international practices in organising research funding will
be addressed, the sharing of data and knowledge promoted, and the networking of infrastructures and databases such
as research infrastructures created or included in the ESFRI roadmap will be increased as a result of ERA PerMed
activities.
In addition, the lessons learned from the ICPerMed and CSA PerMed experiences and the continuous systematic
exchange of information will form the basis for ERA PerMed practices. Throughout the project duration, processes
will be evaluated and adapted if necessary (see WP4 -and WP6-). This iterative process will help the consortium to
not only share but also to effectively use, test and optimise these practices.
ERA PerMed thus will contribute to the preparation and use of European standards, with respect to:
- The “systematic” approach for compiling data and comparing research programmes (i.e. congruence of
terms, standard data formats, software solutions)
- Best practices with regards to programme management and administration as well as innovation issues in
R&D funding
- Definition and validation of appropriate tools and procedures for the selection of multinational projects and
for the monitoring and assessment of multinational procedures
- Harmonised evaluation practices of public funding bodies in Europe, especially the common use and precise
definition of criteria and terms like e.g. ”scientific excellence”, market relevance, clinical/public health
needs, etc.
- General agreements and principles for transnational research activities in the long-term (e.g. rules for a
contractual and legal framework, models for transnational funding scenarios)
- Consistent IPR arrangements in transnational research funding
- Responsible Research and Innovation
Describe how your project will contribute to the expected impacts set out in the work programme, under the
relevant topic
ERA PerMed 13
The changes initiated by ERA PerMed -interdependent, overlappingAssociated
in time, with
and document
mutuallyRef. Ares(2017)5690678
re-enforcing- - 21/11/2017
are described
below within the context of the Call’s expected impacts:
1. Deepened and Extended coordination of national and transnational research in the field of personalised
medicine
As a starting point 31 worldwide research funding organisations are involved in the
implementation of the ERA-Net. By inclusion of very active regions (NUTs 3), which are
demonstrating to be flexible and fast in allocating regional resources on R&D programmes, the
feasibility of aligning the research agenda with national and European priorities has been
guaranteed. This close relation between regional and national funding organisations also creates
additional synergies, which will further advance national and regional research.
ERA PerMed A high interest of other European funding bodies to finance EC co-funded and non-EC co-funded
Approach JTCs has been observed.
Moreover, ERA PerMed is closely linked with the ICPerMed, with which activities are to be
coordinated. This allows the ERA PerMed consortium to have a very important forum to leverage
on for a wider participation and coordination of RFOs and research programmes.
31 National and Regional Research Funding organisation involved in the EC co-funded JTC.
KPIs
Key Enabler ERA PerMed funding bodies.
stakeholders ICPerMed participants.
2. Streamlined national/regional and international practices in organising research funding
Firstly, ERA PerMed relies on the organisation of ICPerMed, which gathers major stakeholders
and RFOs.
ERA PerMed All participating funding organisations have established internal practices to select and finance
Approach the best research. These heterogeneous criteria may give raise to difficulties to organise a
collective effort on PM. For this reason within the activities of the Call Steering Committee
(CSC) these aspects will be discussed and mitigated.
KPIs Alliances of regional or local governments or individual governments if applicable
Key Enabler ERA PerMed funding bodies.
stakeholders
3. Increased interoperability of national research programmes
ERA PerMed Networking of funding agencies facilities interoperability with an alignment of practices and
strategies. This facilitates further transnational collaboration among research actors and
Approach programmes.
KPIs ERA PerMed will start this line by attracting the cooperation of new partners.
Key Enabling Research funding agencies.
stakeholders
4. Increased sharing of data and knowledge
One of the most important objective of ERA PerMed is to exchange and share date for mutual
ERA PerMed learning and practice. In this line, partners share necessary infrastructures, such the electronic
Approach submission tool or web site server access. Funded projects will explicitly be asked to harmonize
and standardise their data and link to existing data bases and patient registries.
KPIs Research groups will benefit from sharing their resources and expertise
Sector or provider associations.
Patient organisations.
Key Enabling Researchers.
stakeholders Relevant ERA-Nets (i.e. E-RARE-3, TRANSCAN-2, ERA CVD, ERACOSYSMED), JPIs (i.e.
JPND), EJPs: Dialogue to avoid duplications and overlapping will be pursued.
5. Increased networking of infrastructures and databases such as ESFRI infrastructures
ERA PerMed 14
Associated
The use of relevant European Research Infrastructure with document
already createdRef. Ares(2017)5690678
or in preparation and- 21/11/2017
ERA PerMed
included in the ESFRI roadmap will be encouraged .Collaboration with i.e. ECRIN-ERIC,
Approach EATRIS-ERIC, BBMRI-ERIC, ELIXIR and EU-Openscreen will be sought.
KPIs Development of a PM European research base
Research-funding agencies.
Key Enabling
stakeholders Scientific community.
European Research Infrastructures.
Cross Cutting Priorities:
International Cooperation
The international ambition of the ERA PerMed is at the very core of the Action and represents the condition “sine
qua non” to achieve the project’s goals. This characteristic is guaranteed by the wide European and global
participation in the Project consortium and by the establishment of:
- task 1.6 which aim to enlarge the number of RFOs in the Joint Transnational Calls as well as establish
links with other networks;
- task 7.1 which aims to reinforce external relationship and representation with other initiatives
Gender issues
The gender dimension has been thoroughly taken into consideration from multiple points of view:
Funding organisations: The participating funding organisations will be encouraged to tackle the challenge from
the institutional point of view. A close link with Gender ERA-Net and similar initiatives is established in order to
promote the adoption of Gender Equality Plans.
Research organisations: The call text of the JTCs will explicitly take into considerations the inclusion of a gender
dimension in the project proposal to be submitted and the peer reviewers will assess whether this was addressed
in an appropriate manner.
Links with other initiatives: The Action will communicate extensively with other projects and initiatives on this
particular matter, such as the Gender ERA-Net or the project TARGET. The plan is to organise a workshop early
on in the project in order to make use of the abovementioned initiatives’ knowledge and experience and increase
awareness of gender issues within the ERA PerMed consortium.
Socio economic science and humanities
Elements of Responsible Research and Innovation have been considered, and specific actions to promote socially
desirable personalised medicine science and technology have been planned -both at institutional and organisational
(JTCs) level. Cross-links between PM approaches and social sciences in cohort studies will be taken into account.
Describe specifically the achievement of critical mass for the funding of trans-national projects by pooling of
national/regional resources and contribution to establishing and strengthening a durable cooperation between
the partners and their national/regional research programmes
The co-financing of PM research projects by 31 partners plus the EC, and potentially further new funding bodies,
will allow the support of more substantial research projects, such as they are need in PM, as well as access to a larger
pool of resources (biomedical resources, but also human resources) not readily available in one country alone. The
contribution of the EC is very valuable because these funds can be used to “fill the gaps” in funding capabilities of
the national funding organisations contributing to the first joint transnational call, thus allowing the funding of even
more of the excellent research consortia.
Furthermore, transnational collaborations have shown to be of utmost important in certain fields (i.e. Translational
research, rare disease acc.) because of the complexity of the issues to be addressed. All organisations and funding
agencies involved in PM research recognise that the development of interventions able to prevent disease and promote
healthy living is a global effort and therefore it is in the interest of all to promote scientific collaboration and conduct
high quality research.
ERA PerMed 15
On the other side, the launching of joint transnational calls through Associated
a networkwith
of document
funding Ref. Ares(2017)5690678
bodies at the European- 21/11/2017
level
allows the financial management of multinational translational research projects based on the “variable geometry”
principle. In this way, ERA PerMed tries to respond to the actual needs in European Personalised medicine research
for integrating the many different challenges it encompasses.
Describe any barriers/obstacles, and any framework condition that may determine whether and to what extent the
expected impacts will be achieved. (This should not include any risk factors concerning implementation, as
covered in section 3.2.)
One of the main central challenges is the greater volumes of data from a wider variety of sources that are being
generated and analysed than ever before. And this heterogeneous information must be integrated and incorporated
into personalised predictive models, the output of which must be intelligible to non-computationally trained
clinicians.
The majority of the ERA PerMed partners has already successfully collaborated in current or previous ERA-NETs
and has thus created a strong tradition of consensus‐oriented collaboration and extensive joint funding experience.
This experience is fundamental for the mutual understanding and collaboration as well as for overcoming possible
obstacles. The ERA PerMed partners are aware of the importance of transnational collaboration and harmonisation
of national efforts. The alignment of national research funding strategies with the objectives of Horizon 2020 took
place in most of the European countries. The consortium assured also the collaboration with strategic stakeholders
and actors in PM related research. We believe that these key elements will ensure the success of ERA PerMed in
achieving the established goals and foreseen impact.
Implementation of the SRIA recommendations and the ICPerMed Action Plan for transnational research funding
on PM
ERA PerMed will establish a close link to ICPerMed. ERA PerMed -with its up to four joint transnational calls (JTC)-
aims to foster the implementation of the Strategic Research and Innovation Agenda (SRIA) as well as the Action
Plan developed within ICPerMed. The Action Plan collects and presents a list of research and research-supporting
activities that have been identified as “ready for action”. These actions will be used for new transnational funding
activities under ERA PerMed, as they will be applied to the topic definition of the JTCs (please also see “3.1 Project
plan” for further description of the strategy).
As ERA PerMed includes funders all over Europe and Canada, the integration of the Action Plan will occur on a
large scale. Thereby, ERA PerMed will achieve a coordinated support and alignment for personalised medicine
research activities and a future basis for the reasonable implementation of innovative and promising approaches in
health systems.
The integration of the Action Plan in the topic definition of the JTCs makes ERA PerMed the ideal tool for the
alignment of national/regional research strategies and funding activities, for the promotion of excellence, the
reinforcement of the Europe’s competitiveness in PM and the enhancement of the collaboration with countries outside
the EU.
2.2 Measures to maximise impact
a) Dissemination and exploitation of results
Dissemination activities featuring and promoting the research results and impact of the funded projects will be central
to ERA PerMed. These activities will reach out to the broader personalised medicine research community and key
stakeholders, including patient organisations and the public.
ERA PerMed 16
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ERA PerMed Purpose Means of dissemination and Target audience WP
results communication tools
Disseminate EC - Maximise - ERA PerMed website and - Clinicians and researchers 2,3 4,
co-funded and participation in joint national/regional funding - Innovation platforms 6
other joint calls bodies organisation’s websites - European Research
transnational - Maximise ERA - ERA PerMed Newsletter Infrastructures
calls PerMed visibility - Conferences and scientific - Patient organisations
events - Industry
- EU portals: Netwatch, Cordis
- Social Networks and media
Research results - Increase knowledge - Open access publications - Researchers in PM 1,4,
of the EC co- and understanding of - ERA PerMed website - Patients organisations 5,7
funded projects PM - ERA PerMed Newsletter - Programme Owners and
- Data sharing and - Presentation in PM events or Programme Managing
networking dedicated sessions Agencies
- EC
- All other PM initiatives
- Policy makers
- General public
Activities and - Increased knowledge - PM scientific meetings ERA - Research and health policy 4,7
funded projects of PM research PerMed final meeting makers
outcomes - Leaflet and activity reports - Programme Owners and
- Increase Programme Managing
understanding of Agencies
funding mechanisms - Patient organisation
for PM research - Industry
- Increase awareness - EC
of PM action - General public
Accommodation - Streamlining of - Strategic workshops - Research and health policy 4,7
of the PerMed national and regional makers
Strategic practices in - Programme Owners and
Research and organising research Programme Managing
Innovation funding Agencies
Agenda (SRIA) - Increase - Patient organisations
and the interoperability of - Industry
ICPerMed national research - PM researchers
Action Plan programmes
Model to - Public engagement, - Newsletters - Industry 5, 7
increase link with industry, - Webinar series - Programme Owners and
collaboration of disseminate ERA - Final Brochure ERA PerMed Programme Managing
industry partners PerMed activities - Mailing list Agencies
- Establishing links - ERA PerMed website - Patient organisations
with industry
initiatives to try to
assure that research
is translated into
practice
Sustainability - Action in engaging - ERA PerMed final meeting - Policy makers 7
scenario - key stakeholders - ERA PerMed reports - Ministries
- Programme Owners and
Programme Managing
Agencies
- EC
- Industry
ERA PerMed 17
Associated with documentorganisations
- Patient Ref. Ares(2017)5690678 - 21/11/2017
b) Communication activities
Communication activities under ERA PerMed will focus on the joint transnational calls and the research results
generated through them. ERA-Net and EU-relevant websites will be important tools to achieve this, as will social
networks, media, leaflets, posters and newsletters distributed to the updated contact list, and presentations at
conferences, especially those linked with the clinical sector, innovation and industry (see WP1, WP2 and WP6).
Communication on objectives, progress, achievements and results of ERA PerMed will be essential to raise public
awareness on the importance of research and funding in the area of PM. Strengthening the communication and
interactions between different stakeholders promotes the building of networks between all players involved in PM.
Communication activities featuring/promoting research results and their impact will be a central knowledge transfer
activity that will reach out to the broader research and innovation community and key stakeholders, including patient
organisations and the public. Dissemination activities will include elements such as summaries for/briefings to
stakeholders. Dissemination activities will make use of the individual partners’ channels as well:
1. The ERA PerMed website, which will serve as a key tool to communicate not only the launching of calls and
ERA PerMed activities, but also results of funded projects and success stories.
2. Annual e-newsletters, which will provide an insight into all ERA PerMed activities and highlight the added
value of the initiative to stakeholders and the public.
3. ICPerMed events, which will bring together all stakeholders of the project: Policy makers, research funders,
researchers from academia and industry, related networks and the interested public. ERA PerMed will benefit
of their organisation and if possible it will organise its events in conjunction of those from ICPerMed.
3. Implementation
3.1. Project plan
The work plan consists of two parts. Part A describes the work packages related to the EC co‐funded call (JTC2018)
and the consortium management (WP1‐WP5). Part B describes the additional joint activities including the up to three
joint calls without EC co‐funding (WP6-WP7). The partners agreed on a general concept for all JTCs along the five
challenges developed within the CSA PerMed SRIA: Challenge 1 – Developing Awareness and Empowerment,
Challenge 2 – Integrating Big Data and ICT Solutions, Challenge 3 – Translating Basic to Clinical Research and
Beyond, Challenge 4 – Bringing Innovation to the Market, Challenge 5 – Shaping Sustainable Healthcare. For
refining the call topics, the ICPerMed Action Plan will also be taken into account.
The first and EC co-funded JTC2018 will mainly cover topics from challenges two and three of the SRIA. The
possibility of including aspects from challenge 1 will be explored by the ERA PerMed partners at the time of
finalising the call text (see WP2).
The planned non-EC co-funded calls (JTC2019-2020 and –tentatively- 2021) will be discussed thoroughly amongst
the funders, and could cover research topics of three challenges or all five challenges to improve interdisciplinary
research and transfer activities. Each funding partner of a JTC will be able to decide which segment of the respective
call they will fund according to their national requirements. Thereby, the ERA PerMed has a direct connection to
the PerMed SRIA challenges and the ICPerMed results, e.g. the Action Plan. This flexibility will allow ERA PerMed
to gather a larger number of funders to optimise personalised medicine activities at European and international level.
Part A: Activities related to the co‐funded call (JTC2018) and the consortium management
WP1: Management
WP2: Preparation and launch of the co‐funded call
WP3: Evaluation and proposal selection of the co‐funded call
WP4: Follow-up and monitoring of projecs resulting from the co-funded call
ERA PerMed 18
WP5: Communication, Exploitation and Dissemination of the Associated
results with document Ref. Ares(2017)5690678 - 21/11/2017
Part B: Additional activities
WP6: Additional Joint Transnational Calls (JTC 2019, JTC 2020 and –tentative- JTC 2021)
WP7: Strategic development and interaction with other initiatives in PM
Strategy/Interaction
WP7
EC Co-funded call Additional Calls
WP2+WP3+WP4+WP5 WP6
Coordination &Management
WP1
Figure 2: ERA PerMed Pert chart
Table 3.1a: Work package description
Work Package Number 1 Start Date or Starting Event Month 1
Work Package Title Management
Participant Number 1 20 11 13 19
Short Name of participant ISCIII FRRB ANR DLR IT-
MoH
Objectives
The overall objective of this work package is to ensure professional, efficient and transparent management and
coordination of all other ERA PerMed WPs towards their objectives within time plan and budget. WP1 will
also connect and integrate ERA PerMed activities to and with ICPerMed and the governing structure and joint
activities of the ERA-Net.
The WP1 leader will:
Establish the management structures and set up the rules for decision making processes in agreement
with the ERA PerMed partners
Manage all administrative, ICT, legal and financial issues
Supervise the day-to-day activities according to the implementation plan
Represent the consortium towards the EC, funding organisation, ICPerMed and other initiatives
ERA PerMed 19
Set up a webpage of ERA PerMed Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Organise a kick-off meeting
Description of work (WPL: ISCIII)
Task 1.1: Implementation of the working and advisory structures and Network Steering Committee
(NSC) and their meetings (Task leader: ISCIII; Contributors: all partners)
The governance structure is composed of three management bodies:
The Network Steering Committee (NSC) is the main decision making body, composed of one
representative per partner; each partner will have the possibility to appoint proxy representatives to
deal with specific consortium issues (financial, strategic, etc.)
The Coordination Unit (CU), based at the National Institute of Health Carlos III (ISCIII) will consist
of the coordinator, project scientific and financial management, and ICT and administrative project
support. The CU will carry out the day-to-day operational management. It will be the primary contact
point for all partners, the different project committees of the ERA-Net, the EC and ICPerMed, as well
as other key stakeholders and European and international initiatives that are important in developing
a strategic alignment. The CU will manage the following overall legal, contractual, technical and
administrative issues:
- Set-up of the consortium agreement (CA)
- Helpdesk for the consortium regarding Horizon 2020 financial and contractual rules
- Follow up and monitoring of the project progress and fulfilment of deliverables and milestones
- Coordination and support of the work packages
- Preparation and drafting of the minutes of the NSC/OG physical and tele-meetings
- Carry out the day-to-day operational management of the project
The Operational Group (OG) is composed of the Coordinator, WPLs and NSC Chair and Vice-chair
who will support the CU in the daily activities. Each WP Leader is responsible for the achievements
of its respective WP in connection with each Task leader (TL) within its WP. Each TL is responsible
for the achievements of its respective task in connection with task contributors.
In addition, for each joint transnational call (JTC), a Call Steering Committee (CSC) will be
established. The CSC will be composed of one representative per partner participating as call funder.
Each partner will have a possibility to appoint proxy representatives to deal with specific joint call
issues (financial, strategic, etc.).
At the official start of ERA PerMed, the coordinator will organise a NSC kick-off meeting to discuss and
update the decision-making rules of the network and other operational procedures according to the rules of the
ERA-Net Cofund scheme. The NSC will elect its Chair and Vice-chair to support the coordination and assure
equity of governance. NSC Chair and Vice-chair may be (re)elected each year.
Task 1.2: Internal liaison with ERA PerMed partners, management committees (Task leader: ISCIII;
Contributors: all partners)
ERA PerMed partners will gather at least 2 times per year for NSC meetings. Communication within the
consortium, in particular those leading WPs (or OG), tasks and subtasks, will be established through regular
conference calls, exchange of e-mails and additionally supported via intranet of the ERA PerMed website.
The Intranet is a secured bank of documents accessible to all partners comprising all documents necessary
for the activities of the consortium.
Task 1.3: Liaison and reporting to the EC (Task leader: ISCIII, Spain; Contributors: all partners)
The CU will be responsible for any communication, interaction and contact between the European
Commission and project partners including:
Transaction of budget
ERA PerMed 20
Associatedfrom
Collection of cost statements and, if required, audit certificates with document
partnersRef. Ares(2017)5690678 - 21/11/2017
Preparation of scientific and technical reports
Informing the EC on any changes in the project via the information letters or (if applicable)
proposition of amendments to the Grant Agreement (GA)
Task 1.4: Maintenance of ERA PerMed ICT and website (Task leader: ISCIII; Contributors: DLR)
The ERA PerMed Information and Communication Technologies (ICT) and website will be launched at the
project starts and will be periodically updated. This activity can be carried out in synergy with the ICPerMed
Secretariat if agreed. These tasks will be focused on:
• Public area: main sections (home, publications, calls for proposals and results, help desk information, events
and news, FAQ, etc.) will be created according to the ERA PerMed partners.
• Intranet (access for ERA PerMed partner’s only): current intranet will be maintained to facilitate the
communication between partners. Access rights will be provided to all partners and each WPL and TL for
coordination activities.
A crosslink to the ICPerMed website from the public area will be added.
Task 1.5: Liaison with ICPerMed (Task leader: ISCIII; Contributors: DLR, ANR, IT-MoH)
This Task will serve as a bridge between ICPerMed (policy) and ERA-Net (research funding). The ICPerMed
Secretariat, comprised of DLR (Germany), ANR (France), IT-MoH (Italy) and ISCIII (Spain), all of them
included in this project, will advise ERA PerMed e.g. on the implementation of the Roadmap and Action Plan,
i.e. helping in the selection of topics for the joint calls for proposals.
Papers and guidelines delineating common policies to improve the research funding impact through data
sharing, common standard, etc will be part of the final report.
Deliverables
D1.1: Intermediate reports to the EC (Month 12, 28, 44)
D1.2: Reports with information on cumulative expenditure incurred (Month 12, 36, 60)
D1.3: Final Report (Month 60)
Milestones
M1.1: Establishment of management bodies: Coordination Unit (CU), Operational Group (OG) and Network
Steering Committee (NSC) (Month 1)
Work Package Number 2 Start Date or Starting Event Month 1
Work Package Title Preparation and launch of the co-funded call
Participant Number 11 3 10 1
Short Name of participant ANR CIHR AKA ISCIII
Objectives
The funding of transnational collaborative research is the most effective joint activity to enhance the
cooperation between scientists working in Europe and beyond on personalised medicine (PM) and thus
reducing fragmentation of research in this field.
The aim of this work package is to prepare and launch the co-funded joint transnational call (JTC2018) for
proposals that will result in funding of transnational research projects in PM. This call will combine for the
ERA PerMed 21
first time budget contributions from the participating European Associated
Member with document
States andRef. Ares(2017)5690678
Associated - 21/11/2017
countries to
Horizon 2020, the EC and additional research funders to maximise the synergies of funding transnational
research projects in PM. The call will relate to the SRIA of the PerMed project and also serve as an important
implementation tool for the goals of the International Consortium in PM (ICPerMed) and its Action Plan.
This work package will provide all relevant call documents –i.e. Call Pre-Announcement, Call Text,
Governance and Evaluation document and procedures, Memorandum of Understanding, Guidelines for
Applicants, Evaluation Guidelines -and set up the electronic submission tool for the pre- and full proposal
stages. The launch of the call will be promoted to the research community, and consultation will be provided
to the potential applicants at national and international level. The implementation of transnational research
funding will be streamlined according to the lessons learned from other ERA-Nets and their co-funded calls.
Description of work (WPL: ANR. Task leader: ISCIII)
The representatives of the participating funding agencies will constitute the CSC that will decide on the
topic(s) and the specific design of the JTC. The Joint Call Secretariat (JCS) will be established at ISCIII
(Partner 1). The JCS will act as a central helpdesk to the applicants regarding all aspects of proposal drafting
and submission and will be in charge of the management of the evaluation of the JTC (WP2, WP3). The CSC
will monitor all actions taken by the JCS.
Task 2.1: Topic selection (Task leader: ANR; Contributors: all partners participating in the EC co-funded
call)
For the call topic development of the co-funded call, ERA PerMed partners will refer to the PerMed SRIA
and the ICPerMed Action Plan (see also description in “1.1 Objectives” and “3.1 Project Plan”).
The partners agreed on a general concept for all JTCs along the five challenges developed within the SRIA:
Challenge 1 – Developing Awareness and Empowerment, Challenge 2 – Integrating Big Data and ICT
Solutions, Challenge 3 – Translating Basic to Clinical Research and Beyond, Challenge 4 – Bringing
Innovation to the Market, Challenge 5 – Shaping Sustainable Healthcare.
For the EC co-funded JTC2018 the Coordination Unit of ERA PerMed already performed a survey to identify
research areas in relation to the PerMed SRIA that are of interest and fundable for the partners. The clusters
used for the survey have been derived from the five SRIA challenges (see above) and comprised the main
topics of each challenge. The two top ranked research clusters out of six options were:
1. Validation, pre-clinical and clinical biomedical research –corresponding to challenge 3 of
the PerMed SRIA: “Translating Basic to Clinical Research and Beyond”;
2. Data analysis, management and protection, including ethical, legal and social implications –
corresponding to challenge 2 of the PerMed SRIA: “Integrating Big Data and ICT Solutions”.
The topic for the first EC co-funded call will be a combination of these two clusters/challenges. Thereby, the
ERA PerMed has a direct connection to the CSA PerMed SRIA/ICPerMed. The call topic will be pre-defined
by the ERA-Net consortium, taking into account those research activities that are suitable for the cofund
instrument. ANR together with the ERA PerMed partners will identify appropriate experts that will form a
Call Advisory Board (CAB). They will meet to refine the topic in order to ensure scientific relevance,
correctness and feasibility. For refining the call topic, the ICPerMed Action Plan will also be taken into
account.
Each partner joining the EC co-funded call as funder will decide which cluster/challenge and which segment
of the value chain shall be covered by its budget in respect to the respective regional or national research
community.
Special consideration will be given to avoid duplication with Horizon 2020 calls in the area of PM. The Call
Text with the call topic will be validated by the CSC at the start of the ERA PerMed project. The projects
must be transnational projects involving at least three independent entities from three different EU Member
States or Associated Countries to Horizon 2020.
Task 2.2: Establishment of the Joint Call Secretariat (JCS) and the Call Steering Committee (CSC)
(Task leader: ISCIII; Contributors: all partners participating in the EC co-funded call)
ERA PerMed 22
The JCS for the co-funded call will be under the responsibilityAssociated with document
of the ISCIII. Ref. will
The JCS Ares(2017)5690678 - 21/11/2017
act as a central
helpdesk to the applicants regarding all aspects of the call including proposal drafting and submission.
In addition, each participating funding organisation will establish its national contact point to support
applicants for advice on national rules and regulations, including eligibility and financial budget regulations.
The representatives of the participating funding agencies will constitute the CSC to monitor all actions taken
by the JCS.
Task 2.3: Preparation of the call documents; (Task leader: ANR; Contributors: all partners participating
in the EC co-funded call)
ANR will be responsible for drafting and finalising all necessary documents as well as harvesting the
necessary information and signatures from the participating organisation. The EC will be duly notified of the
call and its content at least 30 days before the expected date of publication. The documents include:
1. The Call Text, which delineates the aim and the topic of the call, the application procedures
(including deadlines), the evaluation procedures as well as other financial and legal issues including
intellectual property (IPR) and open access publication. The call text will be submitted to the EC for
approval.
2. The Memorandum of Understanding (MoU), which will serve as a joint statement of intention
between the funding organisations participating in the EC co-funded call. The MoU reflects the
commitment of the partners who agree to make every reasonable effort to fulfil the intents expressed
in this co-funded call as well as their earmarked budget. The MoU will be put in place only in case
if the launch of the call would be planned before the official signature of the Grant Agreement with
the EC. Otherwise, the content of the MoU is considered redundant with the GA.
3. The governance of the call, evaluation and ethic assessment document, which describes in detail
steps and rules of the EC co-funded call, especially the two-stage evaluation and selection process
(see WP3), and project monitoring (see WP4).
4. Guidelines for applicants, which describe the administrative details of the application procedure and
include country specific information from different national/regional funding agencies. These
outline the relevant national/regional rules and regulations which applicants must adhere to in order
to be eligible for funding. The guidelines will include the requirement of a publishable abstract of
the proposal, to be used for dissemination purposes only in case of success (see Task 5.2,
communication and dissemination of the results of the co-funded call).
5. Proposal templates for pre-proposal and full proposal stage. Pre- and full-proposal templates will be
developed based on the available versions used in previous ERA-Nets Cofund. The templates will
be modified for the purpose of the ERA PerMed co-funded call.
In addition to these documents, the partner ISCIII will set up the electronic submission and evaluation system
for the call. For instance, the DLR ‘pt-outline’, ANR, IT-MoH and ISCIII submission systems have proven
highly reliable in several previous transnational calls, and it will be adapted to the specific requirements of
the EC co-funded call.
Task 2.4: Launch of the co-funded call (Task leader: ANR; Contributors: all partners participating in the
co-funded call)
The call for proposals will be published on the ICPerMed and ERA PerMed websites and by the national
funding organisations via their national publishing routines such as websites, newsletters, and press
announcements. The publishing instruments of the EC like ERA-LEARN H2020 and EC Participant Portal
will be used as well. Additional routes will include as e.g. a presentation of the co-funded call at relevant
scientific meetings. If feasible and necessary, a call pre-announcement will be published to maximize the
early mobilization of the research community. The Call Text will be submitted to the EC for approval at least
30 days before the expected date of publication. The call will be opened for the submission of pre-proposals
for at least 60 days.
Deliverables
ERA PerMed 23
D2.1: Confidential Call documents: Memorandum of Understanding Associated(MoU),
with document Ref. Ares(2017)5690678
Governance - 21/11/2017
of the call and
evaluation and ethic assessment procedures (Month 3)
D2.2: Public Call documents: Call Text, Guidelines for applicants, Proposal template (Month 3)
Milestones
M2.1: Establishment of the Joint Call Secretariat and the Call Steering Committee (Month 2)
M2.2: Launch of the EC co-funded call, JTC2018 (Month 3)
Work Package Number 3 Start Date or Starting Event Month 3
Work Package Title Evaluation and proposal selection of the co-funded call
Participant Number 1 20 10 13 16 19 11
Short Name of participant ISCIII FRRB AKA DLR NKFIH IT- ANR
MoH
Objectives
The aim of this work package is the management of the evaluation of the proposals submitted in response to
the co-funded call (WP2) and the selection of excellent translational proposals for funding. The submission
and evaluation of the proposals will be carried out in two-steps, with the applicants getting the chance to
respond to reviews during the second evaluation step. The evaluation will be based on a centrally organised
international scientific peer review.
Description of work (WPL: ISCIII. Task leaders: FRRB, AKA, DLR)
The submission, evaluation and proposal selection will use the procedure implemented successfully in other
ERA-Nets in the areas of health research, and will operate in accordance with the rules and regulations set
forth by the EC for Horizon 2020. The consortium will take all lawful steps to ensure confidentiality of
information and documents obtained during the evaluation and selection procedures of the joint call.
Task 3.1: Establishment of the international Peer Review Panel (PRP) (Task leader: ISCIII; Contributors:
DLR, NKFIH, FRRB)
The JCS will be responsible for the establishment of the international Peer Review Panel (PRP) which will
consist of independent external experts in the field of personalised medicine. The composition of the PRP will
be based on the propositions of the CSC with additional input from the JCS. The PRP members will be
internationally recognised external and independent scientists chosen for their scientific, technical and/or
disease-specific expertise in the field of PM. The PRP will be as far as possible gender and geographically
balanced, and may include experts from countries/regions participating and not participating in the EC co-
funded call. Reviewers will be carefully selected with regard to any potential conflict of interest.
Selection and appointment of an Independent Observer. The independent observer will be an internationally
recognised expert who shall assess the conformity of the implementation of the joint call and, in particular,
review the proper implementation of the independent international peer review and the establishment of the
ranking list of trans-national projects.
Task 3.2: Review of pre-proposals (Task leader: FRRB; Contributors: AKA, NKFIH, ISCIII, IT-MoH)
Formal check of submitted pre-proposals
Applicants are invited to submit pre-proposals, which describe the proposed work. In a first stage, the JCS will
check all pre-proposals to ensure that they meet the call’s formal criteria (date of submission; number and
country distribution of participating research groups; category of partners; inclusion of all necessary
information in English; page length). The transnational research proposals will need to involve at least three
independent entities from three different countries or regions participating in the co-funded call. The JCS will
forward the proposals to CSC members who will perform a verification of compliance to country/region rules
ERA PerMed 24
(eligibility check). Solutions will first be explored by each CSCAssociated
member with document
to ensure noRef. Ares(2017)5690678
proposal is excluded- 21/11/2017
for
minor eligibility issues. If no solution can be found, proposals which do not meet the formal conditions will
be rejected without further review.
Remote evaluation of pre-proposals
Eligible pre-proposals will be assessed by the PRP via remote evaluation. The CSC will be support the JCS in
selecting the PRP members and assigning the proposals to PRP members. Each pre-proposal will be sent to at
least three PRP members who are specialists in the approach in question. However, if for a certain proposal
special expertise is needed and not offered by the PRP, ad hoc written reviews will be obtained from additional
independent experts. All reviewers will be asked to use a common evaluation form for the written reviews.
The evaluation of proposals will be aligned on the scoring system (from 0 to 5) and evaluation criteria
(‘excellence’, ‘impact’ and ‘quality and efficiency of the implementation’) stated in Annex H of the General
Annexes of the Horizon 2020 Work Programme 2016-2017. The written statements from the reviewers will
be collected by the JCS.
Invitation for submission of full-proposals
The CSC will decide if the PRP members or a subset of them need to meet physically to discuss the evaluation
results of pre-proposals and select the proposals that should be invited for full submission or if the CSC can
decide which pre-proposals to invite for full submission, based on the remote evaluations. This will primarily
depend on whether there is a high degree of discrepancy between individual assessments of the same proposal,
as this would indicate a need for expert discussions and re-assessment of scores. The number of proposals
selected for the second stage should not be higher than 2-3 times the number of proposals that could be funded.
The JCS will invite the coordinators of the selected pre-proposals to submit full proposals for the second
evaluation step. The written evaluation reports will be anonymised and each one sent to the respective
coordinators of the pre-proposal whether successful or not. The JCS will make an analysis of the
oversubscription factor of each funding agency after the selection of the pre-proposals. CSC members with
important oversubscription factors should try to increase their earmarked budgets in order to avoid funding
gaps in the final ranking list.
Task 3.3: Review of full-proposals (Task Leader: ISCIII; Contributors: AKA, NKFIH, FRRB, IT-MoH)
Formal check of submitted full proposals
The JCS will check the submitted full proposals to ensure that they meet all formal criteria and have not
changed substantially from the respective pre-proposals.
Remote evaluation of full proposals and Right to response of the applicants (Rebuttal step)
The full proposals will be reviewed by at least three PRP members, preferably the same experts who evaluated
the pre-proposal. All reviewers will be asked to use a common evaluation form for the written reviews and to
score the proposals according to the evaluation criteria and scoring system mentioned above (Task 3.2). The
anonymized written evaluations of reviewers will be sent to the project coordinators to allow them to respond
to the evaluators’ comments in so called “rebuttal step” prior to the PRP meeting. Applicants will have one
week to answer the reviewer’s assessment. Once collected, the JCS will then send the pooled reviews and
rebuttals to the PRP members.
PRP meeting to discuss the full proposals and establish a ranking list
The JCS will be supported by the CSC member in whose country the PRP meeting will take place for the
organisation. The PRP members will meet to discuss each proposal taking into account the written reviews,
rebuttals and their own expertise. Finally, the PRP will produce the ranking list of those proposals
recommended for funding according to the evaluation results and discussions (D3.1). The PRP members will
prepare a brief written summary of the written reviews as well as panel discussions for all proposals, which
will be collected by the JCS. The anonymized written summaries will be forwarded to the applicants. The CSC
members will be present at the PRP meeting as observers. In addition, an independent expert will be invited to
the PRP meeting as official observer. He or she will assess the conformity of the general implementation of
the JTC with EC rules, specifically the proper implementation of the international peer review process as wells
ERA PerMed 25
Associated
as the establishment of the ranking list of transnational projects. The with document Ref.
assessment Ares(2017)5690678
of the observer will- 21/11/2017
be
provided in a report to the EC (D3.2).
Task 3.4: National and transnational funding decisions (Task leader: ISCIII; Contributors: DLR, NKFIH,
FRRB)
The CSC will take its final funding decision based strictly on the scientific recommendation of the PRP
(ranking list). The ranking list will be strictly followed as long as national/regional and EC top-up funding is
available. As many proposals as possible with a clear funding recommendation will be funded, taking into
account the available budget. Each eligible applicant will be funded by the organisation of the country from
which the applicant has applied and according to the respective national/regional administrative regulations
(virtual common pot model). The final distribution of the EC top-up funding will be discussed and agreed by
the CSC in order to maximize the number of high quality proposals to be funded by filling funding gaps
and/or topping up the national contributions according to the mixed mode specify in the Consortium
Agreement. The list of projects to be funded will be communicated to the EC (D3.3) and to the civil society
(Task 5.2). Project coordinators will be informed about the final funding decision of their proposals.
Subsequently, the national/regional negotiations will take place. The final funding list will be prepared by the
JCS and provided to WP5 leader for publication on the ERA PerMed website and newsletter, the relevant EC
portals as well as further suitable dissemination channels (see WP5).
Task 3.5: Lessons learned from the EC co-funded call (JTC 2018) implementation process (Task
leader: ISCIII; Contributors: ANR)
This task aims to assess and to report on the co-funded call implementation process including the preparation
of the call documents, the evaluation process and the output of the co-funded call (JTC2018). This report aims
to determine the efficiency and relevance of the co-funded call (JTC2018) and will be of high value for the
additional calls planned inside the initiative (JTC2019, JTC2020, and –tentative- JTC2021). A set of indicators
for the assessment will be determined at the start of ERA PerMed, in agreement with all partners.
Deliverables
D3.1: Final ranking list of proposals recommended for funding (Month 10)
D3.2: Independent Observers’ report on the evaluation (Month 11)
D3.3: Joint selection list of projects to be funded (Month 12)
D3.4: Formal and duly signed commitment on the availability of funds for the selected projects from each
consortium partner participating in the EC co-funded call (Month 18)
Milestones
M 3.1: PRP and Independent Observer established (Month 7)
M 3.2: Publication of the final funding decisions on website (Month 12)
Work Package Number 4 Start Date or Starting Event Month 11
Work Package Title Follow-up and monitoring of projects resulting from the co-funded
call
Participant Number 20 1 18 19 25
Short Name of participant FRRB ISCIII CSO-MOH IT-MoH UEFISC
DI
Objectives
The main objectives of WP4 are:
1. Monitor the implementation and progress of the research projects granted as a result of the co-funded
call JTC2018.
ERA PerMed 26
2. Assess the performances of the co-funded projects andAssociated
estimatewith document
their Ref. Ares(2017)5690678
compliance with the scope- 21/11/2017
of
ERA PerMed. The work will be carried out in close collaboration with the JCS of the co-funded call
(WP3).
Monitoring and Assessment (M&A) is intended to provide information that is credible and useful on the
projects that have been financed through the cofounded call, enabling the ERA-Net JCS, the funding agencies
and the beneficiary organisations to judge the impacts of their efforts as well as translate results and lessons
learned into the decision and policy-making process (science based health care approach). This process will
timely adjust any unbalances and strengthen any weaknesses that might surface during the implementation and
execution of co-funded JTC as well as the ERA-Net itself.
The Monitoring and Assessment activities will focus on the performances of the funded projects in terms of
relevance and fulfilment of the objectives, evaluation of the progress, achievement of the expected impacts,
gender dimension and Responsible Research aspects.
With regard to the timeframe of M&A Analysis, after the co-funded JTC Projects have been granted we will
conduct 2 different M&A:
-1 Interim Evaluation: at month 18 the Project’s coordinator will submit a completed M&A.
- 1 Final Evaluation (to be delivered at month 36).
NB: a post evaluation of the co-funded project is not possible within the timeframe of the ERA-Net.
The M&A will consist of a so-called Real Time Evaluation (RTE), aimed to assess the project results at the
moment that the M&A is conducted.
The chosen criteria against which evaluate the project will be gathered in Indicators Tracking Table (ITT),
where scientific evaluation and their potential impacts on the society, thematic evaluation (i.e. gender impact
assessment, RRI, etc.) and cluster evaluation (aimed to assess cross-sectorial and cross-organisational aspects)
will be included. Elements of meta-evaluation (aimed at assessing and improving the M&A process itself for
the coming JTCs) is to be considered.
The consortium aims to use a self-evaluation approach, which means that the M&A is conducted by project
coordinators using a template of the Indicator Tracking Table, elaborated within the WP4. The potential lack
of information, as the self-evaluation approach might be perceived as more subjective (biased or one-sided) is
mitigated by a peer review of the ITT by CSC.
Description of work (WPL: FRRB. Task leaders: FRRB, ISCIII, CSO-MOH)
Task 4.1: Definition of the indicators, sampling methods and plan for information and data collection
and management (Task Leader FRRB; Contributors: ISCIII, CSO-MOH, UEFISCDI, IT-MoH)
Firstly, the needs and expectations of the participant funding agencies and key stakeholders’ (i.e. ICPerMed)
are surveyed and collected. The latter will form Monitoring and Assessment (M&A) requirements, which will
be then included in the Indicator Tracking Table (ITT) to be sent to the cofunded project coordinators.
Sampling methods will be proposed and approved.
Once the ITT has been prepared, it will be distributed to the funded project coordinators. The coordinators and
partners of co-funded projects will be invited to complete the reports within the set deadlines. The monitoring
team will directly contact the project coordinators for information delivery, reporting requests and the reporting
analysis.
In case the information gathered from the M&A is poor, the consortium shall evaluate the use of secondary
sources of data and/or tailor made surveys to be sent to the Project partners, in order to integrate missing
data/information.
Task 4.2: Data collection and Analysis (Execution of the statistical analysis of the output of the co-funded
joint call) (Task Leader CSO-MOH, Contributors: ISCIII, FRRB, IT-MoH, UEFISCDI)
ERA PerMed 27
Associated
This task is intended to execute the evaluation of the funded projects withencompasses
and document Ref. Ares(2017)5690678 - 21/11/2017
the Data/Information
Preparation, Data/Information Analysis (findings and conclusions), Data/Information Validation, Data
Presentation, Recommendation and Action Plan. The task leader has the responsibility to collect the ITTs and
present the information in a clear manner to the ERA PerMed partners.
Task 4.3: Follow-up of monitoring activities and decision making process (Task leader: FRRB,
Contributors: ISCII, CSO-MOH, IT-MoH, UEFISCDI)
The results obtained with the M&A analysis will be then translated by the CU in a series of recommendation
to the attention of the NSC which discusses and eventually adopts them.
Since it is important to translate the funded project results in policy making decisions, the reports of the M&A
will receive high visibility (through the Communication and Dissemination tools described below).
For what concerns the M&A, the outcomes of the process will be used to correct potential mistake and establish
self-learning mechanisms for the next JTCs.
The results of the ERA PerMed co-funded projects follow-up and assessment will be presented to the ERA
PerMed consortium partners and translated in a decision making process. The outcomes of this task will also
be forwarded to the responsible of WP2 in order to be integrated in the “lesson learned guidelines”.
Task 4.4 Mid-term and Final evaluation (Task leader: ISCIII, Contributors: CSO-MOH, FRRB, IT-MoH,
UEFISCDI)
This task aims to both evaluate the progress and assess the outputs of the projects granted under the co-funded
call.
The evaluation will be carried out in close collaboration with the CUt and the WP3 leader. The accountability
of projects/programmes funded with public money is a strategic priority for the funding agencies as well as the
EC, therefore the participation of the coordinators of the co-funded projects in this monitoring process will
clearly appear in the Call Text as an obligation.
Follow-up through monitoring reports
All co-funded projects will be required to complete the assessment forms, and ERA PerMed will develop a
process to insure compliance. ERA PerMed co-funded projects will be followed up and monitored through a
mid-term progress report, halfway through the project development, and through a final report at the end of the
funding period, in addition to the national reporting requirements. The report format will be customized using
previously established and updated forms. The coordinators and partners of granted projects will be invited to
complete the reports in the indicated period. The monitoring team will directly contact the granted project
coordinators for information delivery, reporting requests and the reporting analysis. The results of the EC co-
funded projects follow-up and assessment will be presented to the ERA PerMed consortium partners on a
regular basis.
The outcomes of the mid-term seminar and final symposium (Task 5.3 and Task 5.4) will be taken into account
respectively for the mid-term and for final evaluation reports.
The results of the assessment of the co-funded call will be made available in collaborations with the WP5
leader. The updated information on the projects including details on participants and project results will be
shared with the EC.
Deliverables
D4.1: M&A report containing lessons learned and recommendations by the Call Steering Committee (Month
15)
D4.2: Mid-term evaluation report of EC co-funded projects (Month 36)
D4.3: Final Evaluation report of EC co-funded projects (Month 48)
Milestones
M4.1: Approval of the list of indicators defined (Month 12)
M4.2: Approval by the Network Steering Committee of the lesson learned and recommendations by the Call
Steering Committee (Month 18)
ERA PerMed 28
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Work Package Number 5 Start Date or Starting Event Month 1
Work Package Title Communication, Exploitation and Dissemination of the results
Participant Number 18 19 26 31 20 25
Short Name of participant CSO- IT-MoH MIZS ZonMw FRRB UEFI
MOH SCD
I
Objectives:
The activities of this work package are focused on communication and dissemination of information on the EC
co-funded call and its outcome in order to create awareness among stakeholders and the general public.
Special care will be taken to increase the visibility and disseminate the results of the EC co-funded projects.
Description of work (WPL: CSO-MOH. Task leaders: IT-MoH, ZonMw, MIZS)
Target audience for the communication and dissemination of the activities related to the co-funded call are the
scientific community, clinical sector, industrial partners, Programme Managing Agencies and Programme
Owners, policy makers at national, regional European and International level, regulators and general public.
Tools for communication will be the ERA-Net and EU relevant EC websites (see WP1 and WP2), social
media such as Facebook, leaflets, posters and newsletters distributed to the updated contact list and
presentation in conferences, especially those linked with clinical sector, innovation and industry.
ERA PerMed dissemination actions will be defined in collaboration with WP1 and WP2, and will be carried
out in collaboration with other WP leaders responsible for the JCS (WP3) and the Monitoring (WP4).
Task 5.1: Communication and dissemination on the launch of the co-funded call (Task Leader: CSO-
MOH; Contributors: IT-MoH)
This task aims to increase the visibility of the launch of the co-funded call. The main target groups can be
divided into two categories:
1. Potential applicants - researchers and/or clinicians – the core target group
2. Representatives of funding bodies from new countries (not yet committed to ERA PerMed)
In order to expand the circle of participants the dissemination activities will start in advance of the launch of
co-funded call. A list of stakeholders will be compiled for example: r e g u l a t o r s , contacts from European
Biopharma networks such as European Biotechnology Networks, European Biopharmaceutical Enterprises
(EBE), and European Association of Pharma Biotechnology (EAPB). In addition, the TL will provide each CSC
member with material for dissemination through national channels.
In addition, existing platforms will be engaged in this task such as NETWATCH
(http://netwatch.jrc.ec.europa.eu), CORDIS WIRE (https://cordis.europa.eu/wire).
Task 5.2: Mid-term review seminar (Task leader: ISCIII; Contributors: CSO-MOH, FRRB, IT-MOH,
UEFISCDI)
A mid-term review seminar will be organized, in collaboration with WP4, in order to provide the coordinators
of the funded consortia the opportunity to present their work and results. The results of the review seminar
will be presented in a mid-term evaluation report (D4.2).
Task 5.3: Final Symposium (Task leader: MIZS; Task co-leader: ZonMw; Contributors: CSO‐MOH)
ERA PerMed 29
In order to enhance the visibility of the ERA‐PerMed activitiesAssociated with document
and strengthen Ref. Ares(2017)5690678
the relationship - 21/11/2017
with different
stakeholders in the field of personalized medicine, a symposium will be organized within this Task and in
collaboration with WP4. The subject and the format of the symposium will be decided by the Network Steering
Committee (NSC). The symposium will give visibility to and raise the awareness of all projects funded by the
ERA PerMed network, not only those of the EC co-funded call (WP2), but also those resulting from additional
calls (WP6). Researchers will have the opportunity to present their results to different stakeholders and policy
makers in the field of personalized medicine. The symposium will include researchers from Europe and
beyond, so as to contribute to the notion of a transnational added value in personalized medicine research and
foster the creation of possible new consortia and new lines of research in the field. The symposium will ideally
be organized back‐to‐back with a pre‐existing scientific conference in the area of personalised medicine in
order to increase visibility and participation.
Task 5.4: Communication and dissemination of the results of the co-funded call (Task Leader: CSO-
MOH; Contributors: IT-MoH)
The results of the co-funded research projects will be disseminated in collaboration with WP4. Success stories
from the co-funded projects will be collected and published by different means (website, leaflets, dissemination
to our contact list, etc.). Submitted patents, start-up creation, and publication of high impact articles will be
highlighted. A newsletter containing the information on projects selected for funding including data on each
participant and abstracts of the project proposals will be prepared. Specific section on the ERA-Net website will
be dedicated to the co-funded research projects. Researchers' updated material as well as posters and slides
from scientific networking events will also be published with proper consent.
A final ERA-Net brochure will include the output and analysis of the results of the co-funded call. It will be
published on the ERA Net PerMed website and distributed during a final symposium.
Deliverables
D5.1: Newsletter content for dissemination of results of the co-funded call and follow-up of funded projects
(Month 14)
D5.2: Final brochure content (Month 58)
Milestones
M5.1: Announcement of the EC co-funded call JTC2018 (Month 3)
M5.2: Mid-term review seminar (Month 28)
M5.3: Final symposium (Month 57)
Work Package Number 6 Start Date or Starting Event Month 6
Work Package Title Additional Joint Transnational Calls (JTC2019, JTC2020 and –tentatively-
JTC2021)
Participant Number 13 11 3 31 25 1 8 28 19 16
Short Name of DLR ANR CIHR Zon UEFI ISCII ETAg CAT- IT- NK
participant Mw SCD I MoH MoH FIH
I
Objectives:
The aim of this work package is to prepare and implement additional, non-EC co-funded Joint Transnational
Calls (JTC). The ERA PerMed partners plan to launch at least two additional calls without EC co-funding in
2019 and 2020. The possibility of launching a third additional call in 2021 will be explored by the partners.
ERA PerMed 30
Associatedform
As ethical, legal and social aspects (ELSA) of personalised medicine with document Ref. Ares(2017)5690678
an important - 21/11/2017
cross-cutting topic
that is also mentioned in the ICPerMed Action Plan, the ERA PerMed consortium will also explore the
possibility of launching a dedicated ELSA call in parallel with one of the additional biomedical calls.
In addition, the operational processes underlying ERA PerMed itself will be evaluated. The preliminary
outcomes of JTCs 2019 and 2020 will be assessed. Furthermore, the additional calls will also be monitored
and their results disseminated.
Description of work (WPL: DLR. Task leaders: ANR, CSO-MOH)
Task 6.1: Selection of call topics (additional calls) (Task Leader: ANR; Contributors: all partners
participating as funders in the additional calls)
As for the EC co-funded call important inputs for the decision on the call topics of each further call will be
derived from the SRIA, the ICPerMed Action Plan (see also description in chapters “1.1 Objectives” and “3.1
Project Plan”), the response to previous ERA PerMed calls and other recommendations from the research
community and CSC and NSC (from the EC co-funded call JTC2018 and other non-EC co-funded calls). For
each call, the Task leader will organise the selection and preparation of the call topic by consulting the research
community and by taking into account the ICPerMed recommendations. Following the procedures described
in WP2.1 for the EC co-funded call, the ERA PerMed partners will choose the appropriate experts for a Call
Advisory Board (CAB) for each additional call which will meet to define the call topics. The final decision on
the call topics will be taken by the respective CSC.
Task 6.2: Second call JTC2019 (Task Leader: ANR; Contributors: DLR, ISCIII NKFIH and all partners
participating as funders in the call)
Subtask 6.2.1: Preparation of the call. (Subtask Leader: ANR; Contributors: DLR and all partners participating
as funders in the call)
All participating funding organisations have to agree unanimously on the common procedures for the call
administration and proposal evaluation. It is planned to use the previously established criteria and procedures,
which will be updated and improved, if necessary according to the lessons learned within each JTC. The
Subtask Leader (STL) will be responsible for drafting and finalizing all necessary documents (e.g.
Memorandum of Understanding (MoU), Governance and evaluation procedures, call Pre‐Announcement, Call
text, Guidelines for applicants, proposal application form, etc.). Previous versions of these documents will be
used as templates, i.e. simply updated and modified for the purpose of the additional JTC. The task leader will
be responsible for collecting the signed MoUs.
Subtask 6.2.2: Establishment of the JCS and implementation of the call. (Subtask Leader: ANR; Contributors:
DLR and all partners participating as funders in the call)
The sub-task leader will set up the JCSand a CSC. The call will be published simultaneously on the ERA
PerMed website and via further dissemination channels (see sub-task 6.6.1) as well as the regular means of the
participating funding organisations (websites, newsletters, press announcements, etc.). ERA PerMed will aim
to publish a call pre‐announcement to maximise the early mobilisation of the research community. The
established two‐step procedure as described in WP3 will be applied, since it is best suited to deal with a high
number of applications. The JCS will act as central helpdesk to the applicants regarding all aspects of proposal
drafting and submission. After proposal submission, the JCS will be responsible for the formal check of the
submitted proposals and the organisation of the applicants’ eligibility checks according to the general rules
and the national/regional eligibility criteria, respectively.
Subtask 6.2.3: Peer review, project selection and national and transnational funding decisions. (Subtask
Leader: ANR; Contributors: all partners participating as funders in the call)
The JCS will be responsible for the organisation and implementation of the evaluation process. A topic‐specific
international Peer Review Panel (PRP) will be constituted to remotely evaluate the eligible pre-proposals and
to decide upon a final ranking of these proposals. The composition of the PRP will be based on the suggestions
of the CSC. This one will decide which pre-proposals to invite for full proposal submission, based on the
remote evaluations. The number of proposals selected for the second stage should not be higher than 2-3 times
ERA PerMed 31
the number of proposals that could be funded. The JCS will inviteAssociated with document
the coordinators Ref.selected
of the Ares(2017)5690678 - 21/11/2017
pre‐proposals
to submit full proposals. The full proposals will be remotely reviewed by the PRP and a rebuttal step is
envisaged prior to the PRP meeting, i.e. coordinators of full proposals will have the opportunity to respond to
PRP reviews. The PRP will meet to discuss each proposal, taking into account the written reviews, rebuttals
and their own expertise. The PRP will prepare a final ranking list of proposals recommended for funding. The
JCS will be responsible for supplying all necessary information to the PRP and CSC in electronic form, and
for organising PRP and CSC meetings. The ranking list will be the basis for the final funding decisions by the
CSC. Following the successfully employed “virtual common pot” model, the CSC decisions will take into
account the earmarked national/regional budgets in selecting the projects to be funded. Solutions for avoiding
funding bottlenecks will be proposed and actively pursued by the participating funding organisations. The JCS
will notify the applicants of the final funding decisions and handle the feedback from the PRP review. The
successful projects will be funded by the participating national/regional funding organisations according to
their respective rules. The JCS will gather an overview of the national grants and will distribute information
on administrative changes in the national funding organisations, if necessary.
Task 6.3: Third call JTC2020 (Task Leader: DLR; Contributors: NKFIH and all partners participating as
funders in the call)
Subtask 6.3.1. Preparation of the call. (Subtask Leader: DLR; Contributors: all partners participating as
funders in the call)
Subtask 6.3.2. Establishment of the JCS and implementation of the call. (Subtask Leader: DLR; Contributors:
all partners participating as funders in the call)
Subtask 6.3.3. Peer review, project selection and National and transnational funding decisions. (Subtask
Leader: DLR; Contributors: all partners participating as funders in the call)
For the description of task 6.3.1 - 6.3.3, please refer to tasks 6.2.1 – 6.2.3. In addition, JTC2020 will take into
account the lessons learned from the previous first additional call.
Task 6.4: Fourth call JTC2021 (Task Leader: IT-MoH; Contributors: FRRB and the CSC)
The possibility of a fourth call will be explored, and the decision on this would be taken in 2020. The Subtasks
would be the same as for the call JTC 2020.
Task 6.5: Monitoring and Assessment of ERA PerMed Additional Joint Calls (Task leader: DLR;
Contributors: ANR, IT-MoH, FRRB, UEFISCDI)
Assessment of the achievements of ERA PerMed itself
The practicability of administrative and operational mechanisms used for implementation of calls, peer review,
funding of projects and scientific follow up will be monitored by the JCS. The lessons learned will fed back
into the design and implementation of the next joint calls. Thus, the evolution of robust and functional
administrative and operational practices will be facilitated. Results of this mechanistic monitoring will be
incorporated in the monitoring reports for individual calls and presented to the relevant CSC.
In addition, a continuous monitoring and evaluation of the ERA PerMed consortium itself is important. ERA
PerMed gathers funding organisations with different scopes and targets. It is therefore important to be aware
of their expectations in joining the network, and to ensure that their overall objectives are met and to implement
changes in the work programme if needed. At the start of ERA PerMed, the network will initiate a structured
monitoring process of the consortium activities. It will be carried out by the partners themselves, referring to
the goals given in this ERA-Net description of work. In a first step, the updated expectations of the consortium
partners for the outcomes of the work will be gathered in a short questionnaire. These expectations will be
discussed in a small workshop to establish a mutual understanding of the common and particular interests of
partners, and indicators will be defined. The selected indicators will be the basis for the design of the final
monitoring questionnaire to gather information to know whether the initial expectations were fulfilled or
frustrated. A final monitoring report on the ERA PerMed activities will be delivered in the end of the ERA
ERA PerMed 32
Associated
PerMed period (D6.5). The information gathered in this task will supportwith
thedocument Ref. Ares(2017)5690678
preparation - 21/11/2017
of the future of ERA
PerMed (WP7.3).
Follow up of the non-EC co-funded projects.
The methodology for the follow up and monitoring of ERA PerMed projects funded under JTC2019 and
JTC2020 will be the same as for the co-funded projects (WP4). Granted projects will be monitored through
annual progress reports and a final report at the end of the funding period. The respective Joint Call Secretariat
will be responsible for the project follow-up. Funded project partners will also participate in midterm review
seminars. These review seminars represent an excellent opportunity for funded researchers to network,
exchange information, and get a broader view of existing research groups in Europe. As the evaluation of
publicly funded projects/programmes is a strategic priority for the funding agencies, the obligation to attend
review seminars will clearly appear in the relevant call text. The complete follow up of projects granted under
the scope of the JTC 2019 and JTC2020, and the tentatively JTC2021, will not be possible within the timeframe
of ERA PerMed due to the start/duration of the projects.
Task 6.6: Communication, exploitation and dissemination of results for non-EC co‐funded calls (Task
leader: CSO-MOH; Contributors: IT-MoH)
Subtask 6.5.1 Communication and dissemination on the calls JTC2019‐2021
Subtask 6.5.2 Communication and dissemination of the results obtained in non-co-funded projects of JTCs
2019, 2020, and -tentatively- 2021
Deliverables
D6.1: List of project proposals selected by PRP, recommended for funding by CSC and funded by national
and regional funders the JTC 2019 (Month 24)
D6.2: List of project proposals selected by PRP, recommended for funding by CSC and funded by national
and regional funders the JTC 2020 (Month 36)
D6.3: Report on the midterm assessment of ERA PerMed projects funded under JTC2019 (Month 56)
D6.4: Monitoring report of the ERA PerMed additional non-EC co-funded calls (Month 59)
Milestones
M6.1 Launch of the JTC2019 (Month 15)
M6.2 Launch of the JTC2020 (Month 27)
M6.3 Decision go/no go of the JTC2021 (Month 32)
Work Package Number 7 Start Date or Starting Event Month 1
Work Package Title Strategic supporting activities to ensure relevance, impact and
sustainability of ERA PerMed work
Participant Number 19 1 31 11 13 15 9
Short Name of participant IT- ISC ZonMw ANR DLR SMWK MSA
MoH III
Objectives
This work package will reach out to and engage with stakeholders in related initiatives and patient organisations
in order to support the achievement of the ERA PerMed’s main objectives. In particular, this work package
seeks to develop relationships and linkages with relevant initiatives to maximise the contribution of ERA
PerMed’s contribution and impact on the advancement of personalized medicine in Europe. Within this broader
PerMed community, a framework for the long term sustainability of ERA PerMed will be developed as a second
objective to this work package. A third objective pertains to the outreach and engagement of patient groups and
representatives to ensure relevance and an appropriate patient-oriented focus to the work of the ERA PerMed.
ERA PerMed 33
Associated
These tasks will be performed together with the WP1/coordination. Aimswithand
document
tasksRef.
willAres(2017)5690678
be implemented - 21/11/2017
in
cooperation with ICPerMed.
Description of work (WPL: IT-MoH. Task leaders: ISCIII, DLR, ANR, ZonMw)
Task 7.1: Relationship with end users and patient representatives (Task leader: ZonMW; Contributors:
CHIR, HRB, MSA)
Successful implementation of PM will be achieved only if all stakeholders, including patients and citizens,
are empowered and develop the required awareness of PM. Public engagement in PM can be increased by
enabling citizens to become actively involved in all phases of research and development. The objective of this
task is to optimise patient (and citizen) empowerment in PM by ensuring that their perspectives and needs are
represented accurately in all applicable aspects of this ERA PerMed. In order to do so, this task focuses on the
identification and implementation of ways to involve patients’ input for international research topic
prioritisation and for the evaluation of expected results in proposed projects for future potential clinical, public
health and social benefits. To facilitate this process, this task will benefit from the focus recently developed
by ZonMw and by directly engaging patients’ and users’ associations. GenomeBC expertise will be fully
covered by the rest of the contributors expertise, after the dropping out from the original consortium in the
proposal.
This task is expected to:
Identify and prepare an updated list of international/European patients’ organisations to be selected
for patient representation (Months 1).
Identify processes in ERA PerMed in which the voice of the patient/citizen should be heard, the ways
to care for that and to prepare and propose such processes to the partners and patient representatives
and implement agreed processes in this ERA-Net and the joint calls for proposals (Months 2-10).
Develop the means for the patient-representatives’ contribution, the impact, input, and the
appropriateness of their participation at different levels in the ERA PerMed call process and collect
this information (Months 12-59).
Task 7.2: External relationship and representation with other initiatives (ESFRI, research
infrastructures, EJPs, JPIs, Other ERA-Nets) (Task leader: ISCIII; Co-leader: IT-MoH; Contributor: ANR,
SMWK, MSA)
On behalf of the ERA PerMed consortium, the CU will be responsible for representation and relations of the
network towards other stakeholders, European, international and national initiatives, which have PM at their
core or tackle cross-cutting issues. The CU will be assisted in interactions and contact in this task by
contributing partners and the NSC Chair and Vice-chair, and task contributors.
This task is expected to enable:
- The improvement of decision-making processes;
- Dialogue to avoid undesired redundancies and overlapping;
- Goal-directed interactions with relevant projects and PM stakeholders at EU, CELAC, and world-
wide level on PM.
- Partnering with above-mentioned stakeholders to share services and achieve common goals
These activities will reduce unnecessary overlaps with other national, European and international activities
thus maximising the efforts undertaken by ERA PerMed.
Task 7.3: Exploring the initiation of new partnerships in transnational funding (Task leader: FRRB.
Contributor: ISCIII, ZonMw, MSA)
All participating organisation in ERA PerMed are committed to fund research on personalised medicine. The
consortium will promote its funding activities and will encourage further national funding organisations to
ERA PerMed 34
Associated with
join the transnational calls. On behalf of the ERA PerMed consortium, the document
CU willRef.
be Ares(2017)5690678 - 21/11/2017
responsible for any
interaction, contact and representation and liaison with the assistance of the NSC Chair and Vice-Chair.
This task is expected to enable:
- The enlargement of the network of funding organisations;
- The consortium will promote the awareness and the necessity for cooperation and transnational
funding of PM research.
These activities may reduce potential unnecessary and overlapping R&I funding, thus maximising the efforts
undertaken by the ERA PerMed.
Task 7.4: Sustainability and exploitation of results (Task leader: ANR Co-leader: ISCIII; Contributors:
DLR, IT-MoH, MSA)
In order to ensure a strategic research and innovation funding policy for the future, a mid-term sustainability
plan for the activities beyond ERA PerMed, its funding and management operation will be developed. The
exchange of knowledge and best practices among ERA PerMed partners during the project will be the basis for
consolidation and further development of the network. The tradition of ICPerMed, together with numerous
national PM initiatives, forms a solid starting point for a sustainable commitment of countries to a strategic
framework programme for personalised medicine research – an important asset in aligning European and
international funding policies. A continuation beyond ERA PerMed requires the exploration of legal
possibilities and/or constraints for a self-sustained model, taking into account existing models like Joint
Programming Initiatives (EJPs), European Joint Programmes (EJPs), Article 185 TFEU Initiatives, European
Economic Interest Group (EEIG), Association Sans Bout Lucrative (ASBLI), foundations and other
collaborative models as well as potential changes to be implemented in the next EU Framework Programme
(tentatively 2020 – 2027).
The task leader will be responsible for collecting the necessary information, comparing the open options with
the needs of the consortium, and preparing sustainability scenarios, the feasibility of which will be discussed
within the NSC.
Deliverables
D7.1: Report on patient involvement and empowerment in ERA PerMed (Month 54)
D7.2: Report on external relations and funders engagement (Month 56)
D.7.3: Report on sustainability R&I funding, management structure for it and operational plan (Month 58)
Milestones
M7.1: Updated list of international patient organisations posted on the website (Month 3)
M7.2: Workshop on sustainability (Month 30)
ERA PerMed 35
Timeline Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Timing of the different Work Packages (WP) and their components (Gantt Chart)
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5
Task Lead
Work Package (WP) Others Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
number participant
WP1 - Management
Implementation of the working and
advisory structures and Network
1.1 IS CIII Al l partne rs M1.1 D1.1 D1.2 D1.3
Steering Committee (NSC) and their
meetings
Internal liaison with ERA PerMed
1.2 IS CIII All part ners
partners, management committees
1.3 Liaison and reporting to the EC IS CIII All part ners D1.1 D1.1 D1.1 D1.3
Maintenance of ERA PerMed ICT
1.4 IS CIII DLR
and website
DLR, ANR, IT -
1.5 Liaison with ICPerMed IS CIII
MoH
WP2 - Preparation and launch of the co-funded call (JTC 2017)
2.1 Topic selection ANR Al l partne rs
Establishment of the Joint Call
2.2 Secretariat (JCS) and the Call IS CIII Al l partne rs M2.1
Steering Committee (CSC)
2.3 Preparation of the call documents ANR Al l partne rs D2.1-2
2.4 Launch of the co-funded call ANR Al l partne rs M2.2
WP3 - Evaluation and proposal selection of the co-funded call (JTC 2017)
Establishment of the international DLR, NKFIH,
3.1 IS CIII M3.1
Peer Review Panel (PRP) FRRB
AKA, NKFIH,
3.2 Review of pre-proposals FRRB ISC III, IT-
MoH
AKA, NKFIH,
3.3 Review of full proposal IS CIII FRRB, IT- D3.1-2
MoH
National and transnational funding DLR, NKFIH, D3.3-4
3.4 IS CIII
decisions FRRB M3.2
Lessons learned from the EC co-
3.5 funded call (JTC 2018) IS CIII ANR
implementation process
WP4 - Follow-up and monitoring of projects resulting from the co-funded call
Definition of the indicators, ISC III, C SO -
sampling methods and plan for MO H,
4.1 FRRB M4.1
information and data collection and UEFISC DI, IT-
MoH
management
Data collection and Analysis ISC III,
(Execution of the statistical analysis CS O- FRRB, IT-
4.2
of the output of the co-funded joint MOH MoH.
call) UEFISC DI
ISC III, C SO -
Follow-up of monitoring activities MO H, IT-
4.3 FRRB D4.1 M4.2
and decision making process MoH,
UEFISC DI
C SO -MO H,
4.4 Mid-term and Final evaluation IS CIII FRRB, IT- D4.2 D4.3
MoH
WP5 - Communication, exploitation and dissemination of the results
Communication and dissemination CS O-
5.1 IT-MoH M5.1
on the launch of the co-funded call MOH
C SO -MO H,
FRRB, IT-
5.2 Mid-term review seminar IS CIII M5.2
MoH,
UEFISC DI
ZonMw,
5.3 Final Symposium C SO -MO H M5.3 D5.2
MIZS
Communication and dissemination CS O-
5.4 IT-MoH D5.1
of the results of the co-funded call MOH
WP6 - Additional Joint Transnational Calls (JTC2019, JTC2020 and –tentatively- JTC2021)
Selection of call topics (additional
6.1 ANR All part ners
calls)
DLR, ISCIII,
6.2 Second call JTC2019 ANR NKFIH, all M6.1 D6.1
part nes
NKFIH, all
6.3 Third call JTC2020 DLR M6.2 D6.2
part ners
FRRB, all
6.4 Fourth call JTC 2021 IT-MoH M6.3
part ners
ANR, IT -
Monitoring and Assessment of ERA
6.5 DLR MoH, FRRB, D6.3 D6.4
PerMed Additional Joint Calls UEFISCDI
Communication, exploitation and CS O-
6.6 IT -MoH M6.3
dissemination of results for non-EC MOH
WP7 - Strategic supporting activities to ensure relevance, impact and sustainability of ERA PerMed work
C HIR, HRB,
Relationship with end users and
7.1 ZonMw Ge nome BC , M7.1 D7.1
patient representatives MSA
External relationship and
representation with other initiatives IS CIII, IT- ANR,
7.2 D7.2
(ESFRI, research infrastructures, MoH SMW K, MSA
EJPs, JPIs, Other ERA-Nets)
Exploring the initiation of new ISC III,
7.3 FRRB M7.3
partnerships in transnational ZonMw, MSA
Sustainability and exploitation of ANR, DLR, IT-
7.4 M7.2 D7.6 D7.3
results IS CIII MoH, MSA
ERA PerMed 36
Table 3.1 b: List of work packages Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Work Work Package Title Lead Lead Start End
package Participant Participant Month month
Nº Nº Short Name
1 Management 1 ISCIII 1 60
2 Preparation and launch of the co-funded call 11 ANR 1 60
(JTC2018)
3 Evaluation and proposal selection of the co- 1 ISCIII 3 60
funded call (JTC2018)
4 Follow-up and monitoring of projects 20 FRRB 5 60
resulting from the co-funded call
5 Communication, Exploitation and 18 CSO-MOH 1 60
Dissemination of the results
6 Additional Joint Transnational Calls (JTC 13 DLR 6 60
2019, JTC 2020, and tentatively JTC 2021)
7 Strategic supporting activities to ensure 19 IT-MoH 1 60
relevance, impact and sustainability of ERA
PerMed work
Table 3.1 c: List of Deliverables
Short name Dissemin Delivery
Deliver
Deliverable name WP Nº of lead Type ation date
able nº
participant level
Intermediate reports to the EC 1 ISCIII R PU Month 12,
D1.1
28, 44
Reports with information on cumulative 1 ISCIII R PU Month 12,
D1.2
expenditure incurred 36, 60
D1.3 Final Report 1 ISCIII R PU Month 60
Confidential Call documents: MoU, Governance 2 ANR R CO Month 3
D2.1 of the call and evaluation and ethic assessment
procedures
Public Call documents: Call text, Guidelines for 2 ANR R PU Month 3
D2.2
applicants, Proposal template
Final ranking list of proposals recommended for 3 ISCIII R PU Month 10
D3.1
funding
D3.2 Independent Observers’ report on the evaluation 3 ISCIII R CO Month 11
D3.3 Joint selection list of projects to be funded 3 ISCIII R CO Month 12
Formal and duly signed commitment on the 3 ISCIII R Month 18
availability of funds for the selected projects from
D3.4
each consortium partner participating in the EC
co-funded call
M&A report containing lessons learned and 4 FRRB R CO Month 15
D4.1
recommendations by the Call Steering Committee
ERA PerMed 37
Mid-term evaluation report of EC co-funded 4 Associated with document R
ISCIII Ref. Ares(2017)5690678
CO - 21/11/2017
Month 36
D4.2
projects
D4.3 Final Evaluation report of EC co-funded projects 4 ISCIII R CO Month 48
Newsletter content for dissemination of results of 5 CSO-MOH R PU Month 14
D5.1 the co-funded call and follow-up of funded
projects
D5.2 Final brochure content 5 CSO-MOH R PU Month 58
List of project proposals selected by PRP, 6 ANR R CO Month 24
D6.1 recommended for funding by CSC and funded by
national and regional funders the JTC 2019
List of project proposals selected by PRP, 6 DLR R CO Month 36
D6.2 recommended for funding by CSC and funded by
national and regional funders the JTC 2020
Report on the midterm assessment of ERA 6 ANR R PU Month 56
D6.3
PerMed projects funded under JTC2019
Monitoring report of the ERA PerMed additional 6 DLR R PU Month 59
D6.4
non-EC co-funded call
D6.5 Monitoring report of the ERA PerMed activities 6 ANR R PU Month 48
Report on patient involvement and empowerment 7 ZonMw R PU Month 54
D7.1
in ERA PerMed
Report on external relations and funders 7 ISCIII R PU Month 56
D7.2
engagement
Report on sustainability R&I funding, 7 ANR R PU Month 58
D7.3
management structure for it and operational plan
3.2 Management structure and procedures
3.2.1. Organisational structure
The governance of ERA PerMed consists of: (i) the Network Steering Committee (NSC) with its Chair and Vice-
chair as the strategic decision-making body, (ii) the Coordination Unit (CU) as the day-to-day management body
with a liaison and representation role outside the ERA PerMed consortium and (iii) the Operating Group (OG)
composed of partners who are in charge of the operational management of the WPs and the Work Package Leaders.
For all Joint Transnational Calls (JTC), a respective Call Steering Committee (CSC) and a Joint Call Secretariat
(JCS) will be established. The evaluation of pre‐ and full proposals will be conducted by the Peer Review Panel
(PRP) and, if necessary, additional independent experts.
ICPerMed
Coordination
Unit (CU)
European
Commission ERA PerMed
(EC)
Operating New funding
agencies
Group (OG)
Call Steering Call Advisory
Committee Board (CAB)
Network Steering
(CSC)
Committee (NSC)
Peer Review
Panel (PRP)
Joint Call
Secretariat (JCS)
Joint Call Applicants
ERA PerMed 38
Figure 3: ERA PerMed organisational structure chart Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Decision making mechanisms
Network Steering Committee (NSC)
The Network Steering Committee (NSC) is composed of one representative from each ERA PerMed partner
organisation and it is the highest decision-making body of ERA PerMed. It will decide on all major and strategic
issues addressed during the course of the project, which substantially affect the scope, direction and content of the
project, including the following issues:
Approval of the Consortium Agreement (CA)
Monitoring the work plan and decision on corrective actions (if needed)
Agreement on modification of tasks (if needed)
Agreement on the timing and scope of ERA PerMed meetings
Approval of ERA PerMed reports (for the EC, for specific stakeholders, for the general public)
Decision on modifications of the budget distribution (if needed)
Consent on dissemination activities
Approval of new partners joining ERA PerMed (which may require a formal amendment of the Grant
Agreement)
Appointment of a new coordinator in case of leaving or of low performance (this would require a formal
amendment of the Grant Agreement)
To fulfil these functions, the NSC will be supported by the Coordination Unit (CU). The Network Steering Committee
(NSC) will meet twice per year, (if necessary, extra-meetings or conference calls shall be organised). The NSC will
be chaired by the NSC Chair, elected for a period of one year. The NSC Chair will be assisted by a Vice-Chair who
is also (re-) elected each year. The coordinator will chair the first NSC meeting (kick-off meeting).
In general, the NSC will aim for consensus, i.e. unanimous decisions by all NSC members. In exceptional cases, a
decision can be taken by voting according to the simple majority principle (this means more votes in favour than
against), with each NSC partner having one vote. If two ERA PerMed partners act as an “institutional couple” i.e.
manage the same research budget, they will only have one vote.
Potential new partners of ERA PerMed can be invited to the NSC meetings to participate as observers, but will not
have voting rights. If new partners join the consortium, they will be integrated into the NSC as Associated Members:
they will not receive EC funding, since the budget is already attributed to the existing partners, but they will have the
same voting rights as described above. Approval of new partners joining ERA PerMed will be done by the NSC
members, who will also decide if a formal amendment to the Grant Agreement (GA) is necessary or not.
Operating Group (OG)
The OG is composed of some of the members of the NSC: the coordinator, each work package leaders and the NSC
Chair and NSC Vice-chair. This small and flexible group will assist and advise the coordinator, suggesting
appropriate solutions to any emerging questions, during the preparation of the NSC meetings and the implementation
and follow-up of the NSC decisions and as a bridge to the NSC. The coordinator will ensure a timely and efficient
communication among OG members, who have tele-meetings and can meet in person if necessary.
Work Package Leaders (WPL)
The overall objectives of ERA PerMed will be achieved through the implementation of the work packages, each of
which will be managed by a work package leader (WPLeader) and tasks managed by task leader (TL).
The WP leaders are responsible for the management and delivery of their respective work packages, including reports
and specific communication activities. The responsibilities of the WP leaders are:
Efficient management of their WP and coordination of partners involved in each WP as task leaders
ERA PerMed 39
Overseeing delivery of WP tasks and deliverables Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Producing WP reports required by coordinator and EC
Active participation in OG meetings and assuring coherence of their WP with other WPs
Task Leaders (TL)
The Task leaders will assist the work package leaders and will be responsible for:
Efficient management of their task and coordination among partners involved in each task (contributors)
Delivery of WP tasks and deliverables
Collaboration with the WPL and other partners involved in their tasks in order to produce the required
reports
Call Steering Committee (CSC)
The CSC will be formed for each joint call and will be composed of those NSC members and additional partners
outside the consortium which take part in the joint call as funders (“variable geometry” principle). The WPLs,
together with the coordinator, will actively pursue the integration of new partners from outside the ERA PerMed
consortium, therefore, if countries that are not members or associated partners of ERA-Net PerMed participate in the
JTC, their representatives will also be members of the CSC.
Similarly to the NSC decisions, CSC agreements should be reached by consensus and, if not possible, simple majority
vote (one vote per funder). As detailed in WP2 and WP6, a Joint Call Secretariat (JCS) will be set up for all
operational tasks of the relevant JTC implementation. It will be the central contact point for the applicants and will
be responsible for organising the scientific evaluation together with the Peer Review Panel (PRP).
Coordination Unit (CU)
The Coordinator will be supported by a Coordination Unit (CU), which will be established at the coordinator’s
location with the role of scientific and financial management, ICT and administrative support. The tasks of the CU
include all aspects of administrative support to the coordinator and other management committees as well as all
communication with the European Commission. The coordinator is a scientific officer from the NATIONAL
INSTITUTE OF HEALTH CARLOS III (ISCIII, partner 1), who is the contractor with the European Commission
(EC) on behalf of the ERA PerMed partners and thus responsible for all administrative, legal and financial issues.
The coordinator is responsible for the efficient management of the consortium and for coordinating and monitoring
the activities of the ERA-Net, so that the project objectives are met. Specific functions of the coordinator include:
Preparation of the CA
Thorough preparation of NSC and OG meetings (including reports)
Timely delivery of regular reports (both on work progress and finances) to the EC
Central management of audit certificates for each ERA PerMed partner, if required
Communication with the EC, the NSC and other stakeholders
Ensure an effective communication between ERA PerMed partners and stakeholders, including the
management of the ERA PerMed website for internal and external communication
Representation of ERA PerMed at external meetings and events
Call Advisory Board (CAB)
The CAB will consist of experts covering the scope of topic(s) of personalised medicine to be covered in a joint
transnational call. Their role will be to offer technical support in defining the topic(s) of each call under ERA PerMed.
The experts will define the scope of each respective call for the Call Text.
ERA PerMed 40
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Table 3.2 a: List of milestones
Milestone Lead Estimated
Milestone name Means of verification
number participant date
Establishment of management bodies:
Coordination Unit (CU), Operational
M1.1 ISCIII Month 1 Minutes of the kick off meeting
Group (OG) and Network Steering
Committee (NSC)
Establishment of the Joint Call
M2.1 Secretariat and the Call Steering ISCIII Month 2 Minutes of the kick off meeting
Committee
Launch of the EC co-funded call, Publication of call documents on
M2.2 ANR Month 3
JTC2018 ERA PerMed website
PRP and Independent Observer
M3.1 ISCIII Month 7 Minutes of the PRP meeting
established
Publication of the final funding decisions Publication on the ERA PerMed
M3.2 ISCIII Month 12
on website website
M4.1 Approval of the list of indicators defined FRRB Month 12 Mid-term evaluation report
Approval by the Network Steering
Agenda, Final brochure and
Committee of the lesson learned and
M4.2 ISCIII Month 18 final evaluation report of co-
recommendations by the Call Steering
funded projects
Committee
Announcement of the EC co-funded call Publication of call text on the
M5.1 CSO-MOH Month 3
JTC2018 ERA PerMed website
Publication on the ERA PerMed
M5.2 Mid-term review seminar ISCIII Month 28
website
Publication on the ERA PerMed
M5.3 Final symposium MIZS Month 57
website
Publication of call text on the
M6.1 Launch of the JTC2019 ANR Month 15
website
Publication of call text on the
M6.2 Launch of the JTC2020 DLR Month 27
website
Minutes of the ad hoc CSC
M6.3 Decision go/no go of the JTC2021 IT-MoH Month 32
meeting
Updated list of international patient Publication on the ERA PerMed
M7.1 ZonMw Month 3
organisations posted on the website website
Workshop on sustainability
M7.2 ANR Month 30 Report of the workshop
3.2.2 Risk assessment
The ERA PerMed project carries potential risks as encountered in previous ERA‐Nets or in any other international
project that gathers national administrations with different goals and cultures. Based on the experience of ICPerMed
and CSA PerMed, and taking into account other ERA‐Net Cofund actions, we will attempt to describe the potential
risks that may occur during the course of ERA PerMed and envision contingency plans to overcome these problems.
The ERA PerMed structure will be built to optimise communication between partners. This will be done with support
of a solid and experienced Coordination Unit (CU), which will identify difficulties and pitfalls through day‐to‐day
contact with the partners and regular conference calls to strengthen these contacts and assess the progress of the work
plan. The regular contact with the WPLeader, the so-called OG, and the NSC meetings with the presentation of the
work done/planned at WP level will ensure that problems in timing or content are identified early on and solved
quickly by the CU together with the NSC Chair, Vice‐Chair and OG or collectively by the NSC.
ERA PerMed 41
The majority of the ERA PerMed partners has already successfullyAssociated with document
collaborated in otherRef. Ares(2017)5690678
ERA‐Net projects, -and
21/11/2017
has
thus created a strong tradition of consensus‐oriented collaboration and extensive joint funding experience.
Importantly, most of the ERA PerMed partners have extensive experience with successful network management, as
most of them are also actively involved in other ERA‐Nets and have, over the years, established organisational,
administrative and scientific links with other research funding agencies/ministries in health and life sciences.
Based on the previous experience of other successful ERA‐Nets, we believe that the overall level of risks foreseen in
ERA PerMed is low and that the composition of the consortium and the governance structure described in the present
application provides guarantees that potential risks (as described below) will be handled and solved.
Table 3.2 b: Critical implementation risks
Description of risk Work Proposed risk-mitigation measures
package(s)
involved
Withdrawal of a partner All WPs - Strong initial commitment from all partners
organisation - Letter of Intent signed by the official organisation
representative have been collected prior to submission
- Experience of the Coordinator in mediation
Loss of leadership of WP or All WPs - Substitution a Task leader of this WP. The structure based in
task the OG and NSC Chair and Vice-Chair will help in the
transition
Delay or failure of a partner to All WPs - WP content and tasks designed by the partners, and dates for
deliver work as agreed deliverables chosen to be as feasible as possible with regard to
the workload
- Experience of Coordinator to overcome difficulties to deliver
work package results
- Many partners are involved in the consortium and may take
over a part of the work upon agreement by the NSC
- Previous experience of WP and task leaders in working
together
- Careful monitoring of WP work by the NSC
Budget reductions, lack of WP 2, 3 and 6 - Strong initial commitment from all partners
funding from some countries - Letter of commitments signed by the organisation
representative have been collected prior to submission
- Minimised by preparing the CA at an early stage
Difficulties to agree on WP2 and WP6 - Call frame has already been agreed upon by the partners
common procedures or - Large experience based on other ERA-Nets calls
common topics for the joint - Lessons learnt from every call will be fed into planning of
calls subsequent calls
Risk of funding WP2, 3 and WP6 - Earmarked national/regional budgets stated in the Letter of
consortia/projects for Intent signed prior to submission
less than the designated - For the co-funded call, use of mixed model allows the use of
budget EC contribution to “fill the gaps”
- Increase of national budget and/or negotiations with
successful applicants
- Extensive experience in co-funded calls from other ERA-Nets
Low number of proposals WP2, 3, 4, 6 - PM call is a historic opportunity and will therefore attract a
submitted within the joint call high degree of interest from the personalised medicine
for proposals community
- Appropriate communication and dissemination tools will be
in place (website, stakeholder database, distribution list for call
pre-announcements)
ERA PerMed 42
Misuse of resources All WPs - Most partner Associated with are
institutions document Ref. Ares(2017)5690678
equipped - 21/11/2017
with internal financial
accounting and auditing offices which have managed numerous
EU projects before
- Quality and reputation of partner institutions (all are public
bodies, funding agencies or ministries)
- Regular audits as/if required as per EC rules
- Experience of the institutions
Lack of partners’ involvement WP6 - Since the beginning of the preparation of this proposal,
in additional calls partners have been asked whether they would in principle be
willing to join further call-type activities
- This is also stated in the Letters of Intent already signed
- The participation in additional joint calls will not be limited
to ERA PerMed partners
Lack of partners’ involvement WP6,7 - The progress of the additional activities will continuously be
in additional activities monitored and presented at each NSC meeting
- Strong management structure with continuous monitoring by
CU, OG and Chair and Vice-Chair of reserve funds have been
secured for a more active involvement of partners in those
activities, in order to allow a flexible management of additional
activities
Incapacitation or withdrawal of WP1 - High quality of the coordination team, with possibility of
coordinator interim replacement by the NSC Chair or Vice-Chair
- Replacement of the coordinator by a representative of a
partner
- Strong commitment of the Coordinator and institutional
support
3.3 Consortium as a whole
The ERA PerMed consortium includes 31 partners from 22 countries and reflecting the huge interest and the
expectations generated by this initiative. The 25 countries involved consist of:
- 18 EU countries, including Eastern, Central, Western, Southern and Nordic Europe partners
- 3 Associated Countries to HORIZON 2020 (Israel, Norway and Turkey)
- 1 Third country (Canada)
The consortium will be led by ISCIII, Spain who has already participated in the four EC co-funded calls implemented
in 2015 by ERA-Nets related to Health Research (JPco-fuND, E-Rare-3, TRANSCAN-2 and ERACoSysMed).
During 2017, ISCIII is also participating in four EC co-funded calls (ERA-CVD, JPI-EC-AMR, NEURON-3 and
ERA INTIMIC co-funded calls). Other ERA PerMed partners also have extensive experience in co-funded calls,
most of them are WPLeader or coordinators (e.g. ANR, France; DLR, Germany; CSO-MOH, Israel; IT-MoH, Italy).
3.3.1 The consortium as a driving force for the development of national and transnational strategies for
research on personalised medicine
The consortium is well-balanced with respect to the significant critical mass achieved in the field and the specificities
of the existing national/regional actors in PM. The majority of partners fund all three categories of actors (academia,
clinic, industry), with some having more experience and knowledge in funding a specific type of actor. Finally, the
consortium benefits from the complementarities and the experience of the individual partners. Most of the partners
are also involved in other ERA-Net Cofund initiatives, which will allow them to share experiences and to take benefit
from lessons learnt in order to achieve optimal results for ERA PerMed, especially when it comes to sustainability
of the network.
ERA PerMed 43
3.4 Resources to be committed Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Table 3.4 a: Summary of national/regional call contributions
The numbers in this table differ from those in the online tool (ECAS). In ECAS column A, budgets include column
(a) from this table PLUS the requested EU contribution (based on 33% of the total budget commitment). The
requested EU contribution (c) is the same amount that appears in column (b) as partners would cover EC funding if
needed. The minimum total call budget for the co-funded call is the sum of column (a) and (c) which is the total of
column A1 in ECAS.
(b) indicative
(a) Initial
possible (c) Requested Minimum Maximum
Participa national
Organisation – additional EU total call total call
nt call
short name contribution national call Contribution budget [€] budget [€]
number contribution
[€] [€] (a + c) (a + b + c)
(optional [€]
1 ISCIII 335,000 165,000
2 FWF 536,000 264,000
5 MZOS 80,400 39,600
6 InnoFond 670,000 330,000
7 ETAg 67,000 33,000
8 MSA 67,000 33,000
9 AKA 804,000 396,000
10 ANR 1,675,000 825,000
11 BMBF 2,010,000 990,000
12 DLR 0 0
13 BMG 0 0
14 SMWK 1,005,000 495,000
15 NKFIH 335,000 165,000
16 HRB 247,900 122,100
17 CSO-MOH 201,000 99,000
18 IT-MoH 1,005,000 495,000
19 FRRB 2,680,000 1,320,000
20 VIAA 201,000 99,000
21 FNR 201,000 99,000
22 RCN 335,000 165,000
23 NCBR 335,000 165,000
24 UEFISCDI 335,000 165,000
25 MIZS 140,700 69,300
26 CDTI 469,000 231,000
27 CAT-MoH 335,000 165,000
28 GN 335,000 165,000
29 SRC 938,000 462,000
30 ZonMw 335,000 165,000
31 TUBITAK 227,800 112,200
SUBTOTAL 15,905,800 7,834,200 7,834,200 23,740,000 31,574,200
ERA PerMed 44
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
3 CIHR 3,250,000 0
5 FRSQ 0 0
Total 19,155,800 7,834,200 7,834,200 26,990,000 34,824,200
Table 3.4 b: Summary of Work package participation and number of years with coordination costs
Parti Participation in Work Packages
Number of years for
cipa A. Co-funded call and management B. Additional
Short which coordination
nt activities
name costs are declared on
num
WP1 WP2 WP3 WP4 WP5 WP6 WP7 the basis of unit costs
ber
1 ISCIII Y Y Y Y N Y Y 5
2 FWF Y Y N N N Y N 5
3 CIHR Y Y N N N Y N 0
4 FRQS Y Y N N N Y N 0
5 MZOS Y Y N N N Y N 5
6 InnoFond Y Y N N N Y N 5
7 ETAg Y Y N N N Y N 5
8 MSA Y Y N N N Y Y 5
9 AKA Y Y Y N N Y N 5
10 ANR Y Y N N N Y Y 5
11 BMBF Y Y N N N Y N 0
12 DLR Y Y Y N N Y Y 5
13 BMG Y N N N N Y N 5
14 SMWK Y Y N N Y Y Y 5
15 NKFIH Y Y Y N N Y N 5
16 HBR Y Y N N N Y N 5
17 CSO-MOH Y Y N Y Y Y N 5
18 IT-MoH Y Y Y Y Y Y Y 5
19 FRRB Y Y Y Y N Y N 5
20 VIAA Y Y N N N Y N 5
21 FNR Y Y N N N Y N 5
22 RCN Y Y N N N Y N 5
23 NCBR Y Y N N N Y N 5
24 UEFISCDI Y Y N Y N Y N 5
25 MIZS Y Y N N Y Y N 5
26 CDTI Y Y N N N Y N 5
ERA PerMed 45
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
27 CAT-MoH Y Y N N N Y N 5
28 GN Y Y N N N Y N 5
29 SRC Y Y N N N Y N 5
30 ZonMw Y Y N N Y Y Y 5
31 TUBITAK Y Y N N N Y N 5
Total 140
ERA PerMed 46
Section 4: Members of the consortium Associated with document Ref. Ares(2017)5690678 - 21/11/2017
4.1. Participants (applicants)
Table 4.1: Description of participants and participating programmes
Participant Name of
Number 1 Instituto de Salud Carlos III
organisation
Short name ISCIII Country SPAIN
Brief description of the legal entity
The National Institute of Health Carlos III (ISCIII) is the main public body in the fields of biomedicine
and health sciences in Spain, providing research funding, management services and conducting research.
For over 25 years, its mission focuses on basic, translational and applied research as well as health
technologies. In addition to this, ISCIII performs intramural activities and has a regulatory role as far as
biobanking and accreditation of research centres is concerned. It is also responsible for managing the
Spanish Strategic Action for Health Research and developing the short-to-long term funding scheme
within the National R+D+I Plan framework.
ISCIII reports directly to the Ministry of Economy and Competitiveness (Royal Decree 345/2012) and the
Ministry of Health, Social Services and Equality (Royal Decree 200/2012). It also has a pivotal role in the
creation of scientific knowledge in the realm of health sciences, disease prevention, care and medical
treatment.
In terms of budget, the Institute is publicly funded (280 M€ in fiscal year 2014) and allocates
approximately 225 M€ to extramural research funding, including competitive annual calls. Since its
inception, through a rigorous selection process based on peer review evaluation, ISCIII has awarded grants
for research projects, networks, equipment, fellowships, technical manpower and research contracts.
Moreover, under the Horizon 2020 umbrella, the Institute is actively involved in the promotion of Spanish
research excellence via its participation in key European transnational initiatives such as: ERA-Net cofund,
ERA-Nets, ERICs, ESFRI project preparatory phases, Art. 185 TFEU initiatives, and Joint Programming
Initiatives. The Institute also participates in other international research consortia (e.g. IRDiRC, ICGC
and the Personalized Medicine Coalition).
ISCIII’s participation in this action will be supported by the Research and Innovation Activities Assistance
Office (OAIN) which is part of ISCIII’s Deputy Director’s Office for International Research Programmes
and Institutional Relations (SGPIIRI). The Foundation for International Cooperation, Health and Social
Affairs (FCSAI) will be also involved in ISCII's work. FCSAI has authorisation to administer the activities
carried out by OAIN. For this reason FCSAI's bank account will be used for the receiving the EC
contribution for this grant based on the agreement to administer ISCIII's participation. Due to the skills
necessary by the nature of the activities to be performed, it may be required to hire the persons dedicated
to this ERA-Net at market price and not according to the listed waves for the Statutory Public Service.
ERA PerMed 47
In a rapidly changing world and with biomedical and health Associated with document
research Ref. Ares(2017)5690678
excellence at the core -of
21/11/2017
its
operational strategy, ISCIII’s action is intended towards the successful adaptation of the Spanish National
Health System in the competitive global learning economy.
Website: http://www.eng.isciii.es/ISCIII/es/general/index.shtml
Identification of the role:
Programme Owner and Manager Y
Programme Owner Y/N
Programme Manager Y/N
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
ISCIII is committed to the funding, management and follow-up of transnational calls in the field of
biomedicine and health sciences. It collaborates with European research infrastructures in the
development of the ESFRI roadmap (e.g. ECRIN, EATRIS, ELIXIR and ERINHA) and it is also involved
in the reinforcement of cross-border cooperation of research programmes through Joint Programme
Initiatives: JPND, JP HDHL, JPAMR, JP MYBL; Article 185 TFEU (AAL and EDCTP); ERA-Net
cofund (ERACoSysMed, E-RARE-3, TRANSCAN 2, JPco-fuND); ERA-Nets (E-RARE, NEURON,
TRANSCAN, EuroNanoMed, Infect-ERA), JPIs to Co-Work and EULAC Health. Within the context of
these initiatives, the Institute has adopted a number of roles: Coordinator, National Contract Point and
Joint Call Secretariat.
ERA-Net Infect-ERA is an initiative in which ISCIII has contributed to the development of Work
Package 7. The latter dealt with the design of a long-term collaboration framework, the set-up of the
external scientific committee and the generation of a network with similar initiatives.
ERA-Net Cofund ERACoSysMed aims to enhance the implementation of Systems Medicine approaches
in both clinical research and medical practice throughout Europe and beyond. ISCIII is WP leader of the
WP devoted to the evaluation of the cofounded call and will be in charge on an additional call as Joint
Call Secretariat.
ERA-Net Neuron II seeks to coordinate national and regional research programmes in neuroscience. The
Institute has been responsible for Neuron II’s Work Package 7, which dealt with the development of a
long-term collaboration framework. Additionally, ISCIII participates in the execution of Work Package
2, which deals with the creation of the strategic agenda; Work Package 5, intended to provide support to
young researchers; and the monitorization of the consortia’s communication activities.
ERA-Net EuroNanoMed III seeks to foster the competitiveness of European research centres engaged
in Nanomedicine. ISCIII is responsible of the Work Package that deals with the development of the
Research Strategic Agenda, the drafting of joint call documents and the design of the long-term
collaboration framework.
ERA-NET Cofund E-Rare-3, ISCIII is responsible of the management of the call secretariat of the third
JTC.
In two occasions (2012 and 2014) ISCIII has been in charge of running the Joint Call Secretariat (ERA-
Net E-Rare-2). The tasks executed during both Calls include: drafting of call documents, design and
coordination of the assessment process, management of the IT platform, selection of reviewers and the
ERA PerMed 48
organization of the evaluation panels −among other things. Joint with
Associated Call 2012 Ref.
document wasAres(2017)5690678
focused on Young
- 21/11/2017
Investigators
EU Joint Programme – Neurodegenerative Disease Research (JPND) ISCIII participated in kind in
the JUMPAHEAD project that supports the implementation of JPI to combat neurodegenerative diseases.
It is a three year project funded by an FP7 2 million euro grant GA no. 260774, in which ISCIII has
actively contributed with the execution of organizational tasks.
In ERA-Net cofund JPco-fuND ISCIII mainly participates in the WP for additional activities and is co-
leader in the alignment of national research plans task
J-AGE is a Coordination Action for the implementation of the JPI "More Years, Better Lives - the
Challenges and Opportunities of Demographic Change". ISCIII is responsible of the management of the
call secretariat of the second and third JTC. ISCIII has participated in the drafting of a non-comprehensive
list of possible instruments that could be used for the implementation of the Strategic Research Agenda
(SRA) and the compilation of results of a Workshop held in Madrid on 22/03/2013.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
ISCIII is the WP1-leader and coordinates the consortium of ERA PerMed; also is WP3-leader
concerning the evaluation and proposal selection of the co-funded call (JTC 2018).
ISCIII is leading the following Tasks:
- Task 1.1: Implementation of the working and advisory structures and Network Steering
Committee (NSC) and their meetings
- Task 1.2: Internal liaison with ERA PerMed partners, management committees Task 1.3: Liaison
and reporting to the EC
- Task 1.4: Maintenance of ERA PerMed ICT and website
- Task 1.5: Liaison with IC PerMed
- Task 2.2: Establishment of the Joint Call Secretariat (JCS) and the Call Steering Committee
(CSC)
- Task 3.1: Establishment of the international Peer Review Panel (PRP)
- Task 3.3: Review of full-proposals
- Task 3.4: National and transnational funding decisions
- Task 3.5: Lessons learned from co-funded call (JTC 2018) implementation process
- Task 4.4 Mid-term and Final evaluation reports
- Co-Leader Task 7.2: External relationship and representation with other initiatives (ESFRI,
EJPs, JPIs, Other ERA-Nets)
- Co-Leader Task 7.3: Sustainability and exploitation of results
As mentioned above, ISCIII participates in many transnational research initiatives, including ERA-Nets,
JPIs, art. 185, taking over the responsibilities of coordinator, joint call secretariat, WP or Task leader.
The personnel involved has in depth experience in managing research programmes, running joint calls
and policy activities.
Short profile of staff member(s) who will be undertaking the work
Dr Rafael de Andrés Medina is Chief of the International Research Programmes and Institutional
Relations Office at ISCIII. His previous professional experience includes: Deputy Director and Head of
the Technical Studies Department at ISCIII and Secretary General of the National AIDS Plan at the
Ministry of Health and Consumers Welfare (1987-1990). Dr Rafael de Andrés is the Spanish
ERA PerMed 49
Associated with Initiatives
representative for a wide range of programmes: EU Joint Programming document Ref.(JP
Ares(2017)5690678
ND, JP HDHL, - 21/11/2017
JP
AMR, JP MYBL), ESFRI Health and Food Strategic Working Group, projects in the ESFRI roadmap
(ERINHA, BBMRI, Euro-BioImaging) ERIC (ECRIN –where holds the position of Chair of the Assembly
of Members since 2014- and EATRIS) and EDCTP. Furthermore, he was elected Chair of the AAL
Association Executive Board (Article 185, TFEU initiative) by its General Assembly of countries
(November 2013-ongoing) and has served as Treasurer in 2007, 2009 and 2011. Also, he has been linked
to the Restraint Committee on the Impact of the AIDS Epidemics on Health Services and their Planning
(Council of Europe, 1989-1991), International Committee on Ethics and AIDS (1989), EC Research
Working Party on AIDS (1987-1991) and is committed to the development of the Spanish participation
in European and transnational initiatives (e.g. E-RARE, NEURON, TRANSCAN, ERACoSysMed,
EuroNanoMed, ERASysAPP, INFECT-ERA, EULAC Health and IRDiRC) to foster the competitiveness
of Spanish biomedical research world-wide.
Mr Ignacio Baanante Balastegui works as a Project Officer managing and coordinating European
transnational research collaborations at SGPIIRI. During 2008-2009, he has been involved as Work
Package leader in ERA-Net PRIOMEDCHILD and partially in NEURON, he also provided support in
other initiatives such as Art. 185 TFEU; AAL, EDCTP, European infrastructures; ECRIN, EATRIS and
BBMR. During 2010 and 2012 he worked at the European Office of the Spanish Ministry of Science and
Innovation, based in Brussels. Throughout his time there, he not only participated in the evaluation and
the monitorization of scientific policies at national, European and International level, but also contributed
to the drafting of analytical documents (i.e. Impact Assessment). Furthermore, Mr Baanante has been the
representative Officer in multilateral European projects and international collaborations; for instance,
EuroNanoMed, E-Rare, TRANSCAN, INFECT-ERA, CSA PerMed, AAL as NCP, and JPI More Years
Better Life. In the course of 2012 and 2014 he undertook the Joint Call Secretariat for Research
Programmes on Rare Diseases (ERA-Net E-Rare), part of the Institute’s agenda to tackle the Health and
Wellbeing Societal challenge, identified in Horizon 2020.
Mr Eduard Güell del Frago works as a Project Officer of the EU and Internationalization Division at
SGPIIRI in the ISCIII. Mr Güell is responsible for the joint call secretariat of the JPI MYBL call 2016
and 2017, through the CSA J-AGE II, as well as the main tasks involved within the JPI MYBL. Mr Güell
plays a key role in the management of other initiatives such as ERANet-LAC, E-RARE or the CSA To
Reach.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
No maximum amount of financial support is defined under ISCIII’s national funding regulations.
Amount for co-funded call: 0.5M€
Information on funding rules applied by ISCIII can be found at:
http://www.isciii.es/ISCIII/es/contenidos/fd-investigacion/fd-financiacion/fd-convocatorias-ayudas-
accion-estrategica-salud/convocatoria-aes-2014.shtml
Does the participant envisage that part of its work is performed by a linked third parties. N
Does the participant envisage the use of in-kind contribution provided by third parties Y
(Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 50
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
2 Austrian Science Fund
Number organisation
Short name FWF Country Austria
Brief description of the legal entity
The Austrian Science Fund (FWF) is Austria's main funding organisation for basic research. The FWF
supports the ongoing development of top-notch Austrian science and basic research based on
international standards. In this way, the organisation makes a significant contribution to cultural
development, to the advancement of our knowledge-based society, and thus to the creation of added
value and prosperity in Austria. One of the FWF's key objectives is to strengthen Austria's international
performance and capabilities in science and research as well as the country's attractiveness as a location
for high-level research. This is achieved primarily by funding top-quality projects for individuals and
teams, and by enhancing the competitiveness of Austria's innovation system and research facilities.
Guided by the principle of research-driven education, the FWF also works to develop Austria's human
resources for science and research in both qualitative and quantitative terms. In addition, the
organisation strives to emphasize and enhance the interaction of science and research with all other
areas of society, culture and the economy, and in particular to increase the acceptance of science and
research through concerted public relations activities. The FWF's annual funding budget came to EUR
199.4 million in 2015.
Identification of the role:
Programme Owner and Manager Y
Programme Owner N
Programme Manager N
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
One of the key objectives guiding the FWF’s activities at the international level is to enhance Austria’s
international visibility as a research location. The FWF’s international programmes include a variety of
funding instruments which are essentially designed to support bilateral and multilateral research projects
as well as international networking.
Since 2003, the FWF has participated in more than 120 bilateral and multilateral international calls,
including some 55 ERA-Net calls. The FWF’s funding volume for international programmes amounted
to EUR 21.4 million in 2015.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
The FWF will use its prior experience to make an active contribution to the activities related to the joint
calls. The FWF’s Department of Biology and Medical Sciences has participated actively in the following
ERA-Nets: E-Rare; E-Rare-2; E-RARE-3; TRANSCAN; TRANSCAN-2; EUROPOLAR; ERA-CAPS;
Pathogenomics; Infect-ERA; NEURON I, II and III; BIODIVERSA 1, 2 and 3; ERASynBio; New
Indigo; ERA-CVD; and ERA CoSysMed.
As a partner in ERA-PerMed, the FWF will be represented on the Network Steering Committee. The
FWF will also participate in the COFUND call as well as other joint calls in the coming years.
The personnel involved have vast experience in running joint calls for projects, and in monitoring and
strategic activities.
Short profile of staff member(s) who will be undertaking the work
Stephanie Resch: Diploma and PhD in microbiology and genetics. Co-founder and R&D manager of
ERA PerMed 51
Associated
a biotech company focusing on vaccine development (Germany andwith document
USA). HeadRef.of
Ares(2017)5690678
the Department - 21/11/2017
of
Biology and Medicine at the FWF since 2005. Participant in various ERA-Nets (e.g. E-RARE,
TRANSCAN, NEURON).
Iris Fortmann: Diploma in Biology. Program manager at the FWF since 2006. Participant in various
ERA-Nets (e.g. E-RARE, TRANSCAN, NEURON, BiodivERsA, ERASynBio).
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
800.000€. Financial support will be provided according to the funding rules of FWF, which can be
provided by the staff members indicated above and/or assessed here: https://www.fwf.ac.at/en.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 52
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
3 Canadian Institutes of Health Research
Number organisation
Short name CIHR Country Canada
Brief description of the legal entity
The Canadian Institutes of Health Research (CIHR) was created in 2000 under the authority of the
Canadian Institutes of Health Research Act. It is an independent agency and is accountable to the
Parliament of Canada through the Minister of Health. CIHR’s mission is to create new scientific
knowledge and to enable its translation into improved health, more effective health services and products,
and a strengthened Canadian health care system. Composed of 13 Institutes, CIHR provides leadership
and support to health researchers and trainees across Canada.
Identification of the role:
Programme Owner and Manager Y
Programme Owner
Programme Manager
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
CIHR has invested in various national calls for proposals, research programs and activities aimed at
supporting cutting-edge research and building capacity in the area of personalized medicine. The
proposed action will be a new international component of CIHR’s Personalized Health Initiative, a
collaborative effort co-led by five of CIHR’s institutes. This initiative will support the implementation
of personalized health delivery through investments in tools and approaches that will contribute to more
cost-effective, sustainable healthcare. Its four main objectives are to optimize patient empowerment in
personalized health care approaches; develop data integration and analysis tools; assess the value of
personalized health care for effective implementation and delivery; and increase researcher awareness
about the importance of integrating sex- and gender-based analysis in assessing relative costs and
benefits. This initiative leverages previous collaborative CIHR investments in personalized health by
driving evidence-based implementation that will identify targeted solutions and lead to more cost-
effective and sustainable healthcare.
CIHR is an active member of the ICPerMEd. Previously, CIHR was a cooperating partner of PerMED
CSA (2013-2015) and contributed to three work packages under this action. In term of additional previous
experience pertaining to the European Union Framework Programme for Research and Innovation, over
the past eight years CIHR’s engagement has expanded rapidly from engaging in one European network
to now participating in 17 networks through Horizon 2020 and Joint Programming Initiatives.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
As a partner in the ERA-Net COFUND ERA PerMed, CIHR participate in the Network Steering
Committee and the Call Steering Committee.
CIHR will participate on the initial co-funded call and our participation to subsequent calls will be
considered, pending alignment with CIHR`s priorities, including the evolution of its Personalized Health
Signature Initiative.
CIHR will also participate in the envisaged additional activities, and will co-lead Task7.4 (Relationship
with patient representative), bringing to the consortium our strong expertize in patient and citizen build
over the years as a priority for our organization and through our Strategy for Patient-Oriented Research.
ERA PerMed 53
CIHR has previous experience with these tasks through Associated with document
its involvement in Ref. Ares(2017)5690678
three work packages - 21/11/2017
of
PerMed CSA and the IC PerMed.
Short profile of staff member(s) who will be undertaking the work
Activities pertaining to CIHR’s participation in ERA PerMed will be coordinated by Dr. Etienne Richer,
Associate Director for the CIHR Institute of Genetics. After completing his Ph.D. in Immunology and
Virology, Dr. Richer joined McGill University as a postdoctoral scientist in genetics of infectious
diseases. Dr. Richer then joined BioMedCom Consultants where he was involved in projects covering a
broad range of healthcare issues from biologic therapies to reimbursement policies. Dr. Richer returned
to McGill in 2011 as the Associate Director for the CIHR Institute of Genetics. Dr. Richer has been
involved in the strategic orientation of the institute, the development of its team and the delivery of its
activities. A major focus of its work has been to develop and coordinate the Personalized Medicine
Initiative and subsequently the Personalized Health Signature Initiative, both at the national and
international levels.
CIHR’s participation to the ERA PerMed will be supported by members of its Personalized Health
Signature Initiative support team. This team includes members from other areas within CIHR, including:
other Institutes, Initiative Management, International Relations, Finances, Competition Design and
Delivery, Communications and Citizen and Patient Engagement.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
CIHR’s estimated maximum contribution amount for the co-funded call is CAD$4.65M.
Financial support will be provided according to the funding rules of CIHR, which can be provided by
the staff members indicated above and/or assessed here website of the agency: http://www.cihr-
irsc.gc.ca/e/193.html.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 54
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
4 Fonds de recherche du Québec - Santé
Number organisation
Short name FRQS Country Canada
Brief description of the legal entity
The FRQS (Fonds de recherche du Québec - Santé), the main provincial funding agency in human
health research in Québec, is a non-profit funding agency created under the Act Respecting the
Ministère de l’Enseignement supérieur, de la Recherche, de la Science et de la Technologie (CQLR,
c. M-15.1.0.1).
FRQS reports to the Minister of Economy, Science and Innovation (MESI), and its mandate is to
promote and provide financial support for health research, dissemination of scientific knowledge, and
the training of researchers and trainees.
The FRQS allocates $100 million annually in awards and grants for public-sector research into human
health carried out today in universities and hospital-based research centres. FRQS funds projects
using any of the recognized methodologies (basic, clinical, epidemiological, public health, health
services and the social determinants of health). Website : www.frqs.gouv.qc.ca
Identification of the role:
Programme Owner and Manager Y
Programme Owner N
Programme Manager N
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
The FRQS has an external relations policy aimed at fostering the development of collaborative
research on the Canadian scene and internationally. The policy's approach is based on three principles
that govern FRQS action on the external relations front: researchers' dynamism and leadership;
FRQS's role as a facilitator; and the policy's consistency with government aims and objectives.
Over the past years, FRQS participated in many ERA-Net calls as well as other joint translational calls
with European countries. In 2015-2016, the funding volume for international programs was about CAD
$ 1.6 million.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
Based on previous experience, the FRQS will actively participate to the activities related to the joint
calls. The FRQS contributed to the following ERA-NETS: NEURON COFOUND, NEURON II, E-
RARE 3, E-RARE 2, ERA-AGE 2, EURONANOMED III as well as to the EU Joint Programme –
Neurodegenerative Disease Research (JPND) and the Joint transnational call on Integrated Research on
Genomics and Pathophysiology of the Metabolic Syndrome and the Diseases arising from it.
Short profile of staff member(s) who will be undertaking the work
Anne-Cecile Desfaits: PhD in Nutrition. Director of Programs and Partnerships at FRQS since March
2014. Previously Director of Partnerships and International Relations (From April 2012 to February
2014). Participates in all the ERA-NETS involving FRQS (E-RARE II & III, Era-AGE, NEURON II,
NEURON COFOUND, EURONANOMED III).
ERA PerMed 55
Karine Genest: Master’s degree in kinesiology and MBA. Associated
Programwith
manager
documentatRef.
FRQS, employed- since
Ares(2017)5690678 21/11/2017
2013. Participates in all the ERA-NETS involving FRQS (E-RARE II & III, Era-AGE, NEURON II,
NEURON COFUND, EURONANOMED III).
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
Financial support will be provided according to the funding rules of FRQS, which can be provided by
the staff members indicated above and/or assessed here: www.frqs.gouv.qc.ca.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 56
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of Ministry of Science and Education of the Republic of
5
Number organisation Croatia
Short name MZOS Country Republic of Croatia
Brief description of the legal entity
The Ministry of Science and Education (Ministry) performs administrative and other tasks related to: the
development of the science, technology and innovation system; the development of research and other
institutions; the application of scientific achievements in certain fields; the harmonization of funding
programmes with research projects; development and monitoring of intellectual property management
policy by means of harmonizing national legislation on intellectual property rights with the acquis
communautaire, and the development of strategic measures for improving the protection and enforcement
of intellectual property rights in order to foster technology transfer from research organizations to the
business sector and society; fostering continuous technological development in the Republic of Croatia;
administering the Registry of Researchers and Research Organizations; monitoring and establishing
scientific, professional and technological cooperation with foreign countries and international
organizations according to international agreements; enhancing the mobility of Croatian and foreign
researchers; scholarships, specialization and practical training of domestic and foreign researchers based
on international, government, business and other agreements; the administrative supervision of research
organizations.
The Ministry participates in the development of programmes and projects, and the implementation of the
EU-funded projects as well as projects funded from other international sources. The Ministry cooperates
with the ministry competent for management of state property in all affairs regarding management and
disposal of shares and interests in state-owned companies, as well as companies which are primarily
engaged in activities within the jurisdiction of this Ministry. The Ministry performs tasks related to the
participation of the Republic of Croatia in the activities of European Union bodies and other international
bodies pertaining to its competence.
Identification of the role:
Programme Owner and Manager Yes
Programme Owner No
Programme Manager No
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
The Ministry of Science and Education participates in a wide range of European research programmes
and has previously been involved as a partner institution in a number of ERA NET initiatives.
Main tasks attributed to the proposed action and the previous experience relevant to those tasks
The main task of the Ministry is to define strategic priorities in science and research and to ensure
adequate conditions for their implementation.
Short profile of staff member(s) who will be undertaking the work
TBD
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
The Ministry of Science and Education plans to commit up to 120.000 € for the co-funded joint call.
Financial support will be provided according to the funding rules of MZOS, which can be provided by
the staff members indicated above and/or assessed here: https://mzo.hr/en.
ERA PerMed 57
Associated
Does the participant envisage that part of its work is performed bywith document
a linked Ref. Ares(2017)5690678
third No - 21/11/2017
parties.
Does the participant envisage the use of in-kind contribution provided by third No
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 58
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
6 Innovation Fund Denmark
Number organisation
Short name InnoFond Country Denmark
Brief description of the legal entity
Innovation Fund Denmark (IFD) is a government agency which invests in new knowledge and
technology creating growth and employment in Denmark.
Innovation Fund Denmark is willing to venture an investment in projects at an early stage where others
might not be convinced of its potential: IFD is ready to take a chance and run a risk in order to create
growth, employment and more welfare in Denmark.
Website: https://innovationsfonden.dk/en
Identification of the role:
Programme Owner and Manager Y
Programme Owner Y
Programme Manager (Y)
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
Innovation Fund Denmark have three overall investment programmes:
Grand Solutions: For substantial investments and long-term projects/partnerships where the focus
is on research, technology, experimental development and market development
InnoBooster: For small enterprises and entrepreneurs with sound development plans
Talents: For undergraduates, recent graduates or postgraduate researchers aiming to become
entrepreneurs or to secure a research career in the private sector
Main tasks attributed the proposed action and the previous experience relevant to those tasks
If IFD decides to invest in a project, requirements are made to the proposed research. It is expected that
the project has the potential to achieve results in the form of new knowledge, growth and employment.
It is a key objective of IFD that the projects receiving funding will benefit Denmark and Danish
society. This means that IFD may stop projects if they fail to achieve the anticipated results. On the
other hand, reinvestment is an option if the project proves to have greater potential than originally
anticipated.
IFD’s ethos is based on responsible research and innovation. This is why IFD requires that the funded
projects show commitment to the common good, transparency, ethical conduct and education and
training of new researchers and graduates
InnoFond participates in WP2 and WP6 on the foreseen joint transnational calls
Short profile of staff member(s) who will be undertaking the work
Peter Høngaard Andersen: Director and General Manager. Responsible for the development of the
Innovation Fund's new structure and strategy. He has 25 years of management experience, most
recently as chief science officer of the pharmaceutical company Lundbeck, and has long and broad
experience in both research and development projects. He is behind a significant scientific production
and a number of patents.
Charlotte Videbæk, MD, specialist in neurology, clinical research and R&D projects
Ejner K. Moltzen, MSc, specialist in preclinical research, alliance management and R&D project
management
ERA PerMed 59
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
Financial support for a specific project/third party is based on an individual evaluation and on priorities
within the overall IFD framework of investment. For ERA Permed the overall maximum funding is 1
mEUR.
Financial support will be provided according to the funding rules of InnoFond, which can be provided
by the staff members indicated above and/or assessed here website of the agency:
https://innovationsfonden.dk/en.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 60
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
7 Eesti Teadusagentuur
Number organisation
Short name ETAg Country Estonia
Brief description of the legal entity
The Estonian Research Council (Eesti Teadusagentuur, ETAg), established on the 1st of March 2012 is a
successor of the Estonian Science Foundation (Eesti Teadusfond, ETF). The Council is a private body
fulfilling public functions, responsible to the Ministry of Education and Research.
ETAg keeps its predecessor’s, in 1990 established the Estonian Science Foundation’s expertize as a
research funding organisation with the main goal to support the most promising high level science
excellency research initiatives in all fields of basic and applied research including humanities and social
sciences and to use state budget appropriations to award peer-reviewed research grants on a competitive
basis.
Council facilitates Estonian researchers' international collaboration. Estonian Research Council is
responsible for cooperation with Science Europe, participation in Article 185 (BONUS), ERA-NET Co-
funds (BiodivERsA, M-ERA.NET, WaterWorks2014, NORFACE, HERA etc.) and other international
bi- and multinational cooperation programmes. It has acted as a National Contact Point (NCP) in
Framework Programmes and acts as the NCP in Horizon 2020, coordinates participation in the COST
network and offering counselling of mobile researchers through the EURAXESS network.
Identification of the role:
Programme Owner and Manager Y
Programme Owner Y
Programme Manager Y
In case you are a Programme Manager, please name the respective Programme Owner or public
authority that is providing the mandate for your participation:
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
Estonian Research and Development and Innovation Strategy - „Knowledge-Based Estonia“ 2014-2020
Strategy
Main tasks attributed the proposed action and the previous experience relevant to those tasks
Estonian Research Council has a long term experience in managing calls and funding high level science
excellency research in all fields of basic and applied research including humanities and social sciences.
In international level it is well experienced partner in Article 185 (BONUS) and different ERA-NETs
and ERA-NET Co-funds (BiodivERsA, M-ERA.NET, ERA-NET WaterWorks2014, NORFACE,
HIVERA, ERA-CVD etc.) participating mostly as work package partner and joint call partner, but has
fulfilled also tasks with high responsibility (Call Secretariat in ERA-NET Biodiversa-2). ETAg has also
long-term cooperation with partner offering Electronic Proposal Submission System service which has
high reputation in ERA-NETs BiodivERsA and ERASysAPP joint-call partners.
Short profile of staff member(s) who will be undertaking the work
ERA PerMed 61
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Margit Suuroja, MSc in Geology from the University of Tartu, started her activities in Estonian
Research Council in 2004 as chief specialist of the environmental and life sciences. She has good
experience with project management of the ERA-Net projects (BONUS, ERASysAPP, ERA-CAPS,
HERA, ERA-CVD).
Aare Ignat, PhD, has educated as chemical engineer and defended Ph.D. both in organic and physical
chemistry. He has over fifteen-year experience as a researcher at different research institutes dealing with
various issues in the fields of organic and bioorganic chemistry. Before joining the Estonian Research
Council in 2008 he worked as a development manager at a cosmetics and consumers’ chemicals company
developing brands on natural and environmental friendly basis. In Council he has long term experience
working as Council’s representative and project manager in different ERA-NETs.
Do your national funding rules specify a maximum amount of financial N
support to a third party?5
If yes, please insert the maximum amount [Euro]:
Criteria for determining the exact amount under national funding rules
Please insert the reference (e.g. weblink) to the criteria for determining the exact amount under
national funding rules.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules6.
Co-fund call contribution: 100.000 euro. National funding rules.
Financial support will be provided according to the funding rules of ETAg, which can be provided by the
staff members indicated above and/or assessed here: http://www.etag.ee/en.
Does the participant envisage that part of its work is performed by a N
linked third parties7.
If yes, describe the third party, the link of the participant to the third party, and describe and justify
the foreseen tasks to be performed by the third party
Does the participant envisage the use of in-kind contribution provided by N
third parties (Articles 11 and 12 of the Model Grant Agreement)
If yes, describe the third party and their contributions
5
This information is required by the financial regulation.
6
This information is required by the financial regulation. If no maximum amount of financial support is defined under national
funding rules please put the amount for call contribution.
7
A third party that is an affiliated entity or has a legal link to a participant implying a collaboration not limited to the action
(Articles 14 of the Model Grant Agreement).
ERA PerMed 62
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
8 Ministry of Social Affairs
Number organisation
Short name MSA Country Estonia
Brief description of the legal entity
Ministry
Identification of the role:
Programme Owner and Manager Y
Programme Owner Y
Programme Manager Y
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
“Let´s take the direction towards pminersonalised medicine!” National Program of developing and
applying personalised medicine in Estonian health care system 2017-2021”
Program themes:
1. Clinical pilots
2. Developing the National Biobank
3. Doctor/nurses training
4. Communication
5. Developing technological infrastructure (data repository, personalized medicine decision tools)
Main tasks attributed the proposed action and the previous experience relevant to those tasks
Ministry of Social Affairs is partner in several international research initiatives (ESS ERIC, JPI HDHL,
JPI AMR) and works closely with Estonian Research Council (the other partner of ERA-Net PerMed
from Estonia) who has a long term experience in managing calls and funding high level science
excellency research in all fields of basic and applied research including humanities and social sciences.
Short profile of staff member(s) who will be undertaking the work
Krista Kruuv-Käo, M.D., Estonian Personalized Medicine Program manager at the Ministry since 2017.
Her professional track record contains successful establishment and management of The Estonian
Genome Center of The University of Tartu (former Estonian Genome Project Foundation). Krista has
also experience in management of health care service providing company Karell Medical Center as a
CEO and management of personalised medicine projects at Estonian Competence Centre on Health
Technologies. Krista Kruuv-Käo has graduated from University of Tartu, Estonia as a medical doctor.
Marju Raju, Ph.D., has been working in the Ministry since 2005 as an analyst and from 2015 holds the
position of TA adviser. She has good experience with national and EU research project management and
organizing calls of tender of research projects.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
Co-fund call contribution: allocated funds 100 000 euros, pending on state budget approval in the
Parliament (by the end of April 2017). National funding rules.
Financial support will be provided according to the funding rules of MSA, which can be provided by
the staff members indicated above and/or assessed here: https://www.sm.ee/en.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 63
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
9 Academy of Finland
Number organisation
Short name AKA Country Finland
Brief description of the legal entity
The Academy of Finland’s mission is to fund high-quality scientific research, provide expertise in science
and science policy, and strengthen the position of science and research. AKA is an agency within the
administrative branch of the Finnish Ministry of Education, Science and Culture. AKA works to
contribute to the renewal, diversification and increasing internationalisation of Finnish research.
Activities cover the full spectrum of scientific disciplines. AKA supports and facilitates researcher
training and research careers, internationalisation and the application of research results. AKA is also
keen to emphasise the importance of research impact and breakthrough research. AKA therefore
encourages researchers to submit boundary-crossing applications that involve risks but also offer promise
and potential for scientifically significant breakthroughs. Funding for research amounts to 428 million
euros in 2016. Each year, funding contributes to some 2,700 people’s work (FTEs) at universities and
research institutes in Finland.
Identification of the role:
Programme Owner and Manager Y
Programme Owner Y/N
Programme Manager Y/N
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
Personalized Health – From Genes to Society (pHealth) is the Academy’s research programme covering
research from basic biomedical and computational research challenges to clinical practice and societal
questions rising from this new health promotion approach.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
AKA will take part in the joint calls and will follow up on funded Finnish projects. AKA will also help
in WP2 and WP3.
Short profile of staff member(s) who will be undertaking the work
Jukka Reivinen (PhD in biochemistry in 1997) has worked 13 years at the Academy of Finland
currently as a programme manager with research programmes Personalized Health – from Genes to
Society (pHealth), Health from Cohorts and Biobanks (Cohort), and Synthetic Biology (FinSynBio).
Previous experience includes research positions at the University of Helsinki, STUK Radiation and
nuclear safety authority and private biotech sector. His main interests are societal aspects and impact of
science as well as research policy.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
The allocated amount of funding from the Academy of Finland and participation for each of the
separate ERA-NET calls will be decided individually based on the call theme and prevailing budget
limitations. Academy tries to contribute with a reasonable level, so that the joint calls are both attractive
for Finnish applicants and also that Finnish researchers are attractive and potential consortium members
for researchers from other countries.
The applicant for Academy of Finland research funding (i.e. the principal investigator of a research
project) must be a researcher at the professor or docent level or with a doctoral degree, unless the call
text indicates otherwise. The Academy of Finland requires that the site of research (e.g. university
ERA PerMed 64
department) provides the research project with all necessaryAssociated with document
basic facilities. Ref. Ares(2017)5690678
These are determined- 21/11/2017
based on the nature of the research and are the same as those available to other research staff at the site.
Financial support will be provided according to the funding rules of AKA, which can be provided by
the staff members indicated above and/or assessed here: http://www.aka.fi/en.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 65
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant
10 Name of organisation French National Research Agency
Number
Short name ANR Country France
Brief description of the legal entity
The French National Research Agency (ANR) was established by the French government in 2005 to
fund research projects, based on competitive schemes giving researchers the best opportunities to carry
out their projects and paving the way for ground-breaking new knowledge. The main mission of ANR
is to fund the best basic research, but also targeted and applied research in particular through
partnerships between companies and public sector laboratories. Its action is thus intended to support
French research excellence at both academic and technological levels by means of a rigorous selection
process based on evaluation by peer review. In addition, ANR also targets strengthening international
cooperation by contributing in particular to the funding of multinational consortia in partnership with
other funding agencies in Europe and beyond.
The ANR 2016 Work Programme, adopted on 18 June 2015 by its Governing Board, comes under
the framework fixed by the "France Europe 2020" Strategic Agenda presented by the Minister for
Higher Education and Research on 21 May 2013. Personalized Medicine-related actions are at the core
of this agenda. The Work Programme 2016 is consistent with the National research strategy and takes
into account the priorities set by the agenda and the contributions from the national thematic Alliances.
In the context of the Work Programme 2016, ANR’s 2016 generic call for proposals received 8,181
pre-proposals including 2,690 in Biology and Health. The number of projects selected stands at 667
(overall selection rate of 9.7% for the entire process), with 250 research projects in Biology and
Health (108 M€). On 18 July 2016, the ANR Governing Board adopted the Work Programme 2017
(WP 2017), which is currently open.
ANR funds are available in all scientific fields, for both fundamental and industrial research. Since
2010, ANR has also been the principal operator of the Investments for the Future programme in the
field of higher education and research. In this role it ensures the selection, funding and monitoring of
projects relating to the centres of excellence, health, biotechnologies, and the transfer of technology
and the creation of value from research. Since its inception in 2005, the ANR agency awarded more
than 14,300 grants: among those more than 4,000 around Biology and Health and more than
1,500 international projects co-funded with foreign counterparts.
Identification of the role:
Programme Owner and Manager Y
Programme Owner Y
Programme Manager Y
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
Developing European and international collaborations is one of the priorities of the ANR. The ANR has
participated / is participating in 25 ERA-NETs under the FP7 program, such as ERASynBio, E-RARE-
2, NEURON II, as well as 15 ERA-NETs Cofund under the H2020 program, such as EraCoSysMed,
JPco-fuND, NEURON Cofund, and in 9 out of the 10 JPIs (in Cultural Heritage the ANR is observer),
the article 185 AAL, the EJP CONCERT, and multiple bi- and multi-lateral collaborations. In addition,
the ANR is currently coordinating eight ERA-NETs (CHIST-ERA II, FLAG-ERA, EuroNanoMed II,
Infect-ERA, E-RARE-3, ERA4CS, WaterWorks 2015 and, ERA-HDHL).
ERA PerMed 66
ANR does not have a specific call for proposal in the fieldAssociated with document Ref.
of personalised Ares(2017)5690678
medicine. - 21/11/2017
Nevertheless,
personalised medicine research projects are funded in the generic call open to all projects on life, health
and well-being sciences.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
ANR leads the following tasks of this proposal:
Task 2.1: Topic selection for the co-funded call
Task 2.3: Preparation of call documents for the co-funded call
Task 2.4: Launch of the co-funded call
Task 6.1: Selection of the topic (additional calls)
Task 6.2: Second call JTC2019
And will be contributing in:
Task 3.5: Lessons learned from co-funded call (JTC 2018) implementation process
Task 6.4: Monitoring and Assessment of ERA-PerMed Additional Joint Calls.
Task 7.2: Sustainability and exploitation of results
ANR is the WP2-leader and coordinates the preparation and launch of the co-funded call (JTC 2018) and
will be involved in task 3.5, about Lessons learned from co-funded call (JTC 2018) implementation
process. As task leader for Task 6.1, ANR will be in charge of the organisation of the selection of topic
for all additional calls within the ERA-Net PerMed. Additionally, ANR will be the task 6.2 leader and
therewith responsible for the organization and management of the third Joint Transnational Call in 2019,
which involves the establishment of the joint call secretariat and the preparation and implementation of
the call and involved in the Monitoring and Assessment of ERA-PerMed Additional Joint Calls (Task
6.4).
ANR will also contribute in the task 7.2 dedicated to the sustainability of the ERA-PerMed project.
As mentioned above the Department of Biology and Heath Department of the ANR participates in many
transnational initiatives, including 7 ongoing ERA-NETs, 4 JPIs and 1 EJP taking over the
responsibilities of coordinator, WP or Task leader. The personnel involved has in depth experience in
running joint calls for projects, monitoring and policy activities.
Short profile of staff member(s) who will be undertaking the work
Dr. Monika Frenzel, (female) scientific officer for transnational collaborations in the Biology and
Health department, is in charge of representing the ANR in several transnational collaborations. She
completed her PhD in Physical Biochemistry and Radiation Biology followed by a first post-doc at the
Commissariat à l'énergie atomique et aux énergies alternatives (CEA, Fontenay aux Roses, France) in
cytogenetics and Cohort studies. She is work package/challenge leader in different transnational
initiatives. She participates in the ICPerMed Secretariat (CSA).
Dr. Daria Julkowska, (female) scientific officer for transnational collaborations in the Biology & Health
department. She is the present coordinator of E‐Rare‐3 program. She obtained her international PhD in
molecular microbiology followed by the post‐doctoral experience in cellular biology at Institut Pasteur,
Paris. She obtained diploma in scientific communication and European Union counselling. Since 2010
she worked for E‐Rare‐2 where she occupied at first the position of project manager to finally (January
2013) take over the coordination of the program. She participates in the ICPerMed Secretariat (CSA).
Dr. Véronique Briquet-Laugier, (female) lead thematic expert in the Health & Biology department, is
an alumna of UCLA in the USA. Expert in rare blood disorders, she established her team at Inserm in
Paris (www.inserm.fr), and obtained her Habilitation in 2006. Then, she joined ANR to develop the
European and international collaborations in Health & Biology domains. In 2010, she takes a position as
a diplomat to counsel the French Ambassador to India about Science, Technology and Innovation. During
ERA PerMed 67
these four years spent in New Delhi, she headed a largeAssociated
team ofwithscientist
document Ref.
andAres(2017)5690678
administrators, - 21/11/2017
and
coordinated a feasibility study about Indo-European cooperation funded by the European Commission
under FP7. In 2014, she comes back to the agency where she is involved in Public Health, Cell &
development biology, and in European & International programs.
Dr. Catherine Dargemont, (female) EMBO member, director of the Biology and Health Department at
the ANR, worked for 20 years at the CNRS as a group leader in cell and molecular biology. In parallel
of her scientific activities, she was deputy director at the CNRS and then joined the HCERES (French
Agency for evaluation) to supervise research institutes evaluation and to produce evaluation syntheses in
Life Sciences as a support for science policy decisions. As the head of the department, she supervises the
involvement in 4 Joint programs (JPI), 8 ERA-NETs and multilateral projects.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
2 500 000 €: this is the call contribution of this partner, as no other maximum amount of financial
support is defined under national funding rules.
Financial support will be provided according to the funding rules of ANR, which can be provided by
the staff members indicated above and/or assessed here: http://www.agence-
nationalerecherche.fr/en/information/documents/detail/regulations-pertaining-to-the-conditions-of-
allocation-of-anrfunding/
ANR ensures that no structural funds are used to pay projects from an ERA-NET COFUND call. These
projects will be financed by national funds.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 68
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
11 Federal Ministry of Education and Research
Number organisation
Short name BMBF Country Germany
Brief description of the legal entity
The German Federal Ministry of Education and Research (BMBF) supports innovative projects and ideas
in research through targeted funding programmes. Funding is provided for projects in a wide spectrum
of research areas, covering the whole range from basic research in natural sciences, environmentally
friendly sustainable development, new technologies, information and communication technologies, the
life sciences, work design as well as structural research funding at institutions of higher education to
innovation support and technology transfer.
Division 614: Development of Methods and Structures in the Life Sciences is responsible for funding
research in areas including systems biology, systems medicine, bioinformatics, medical informatics,
genomics research, neuroscience, development of methods and technologies and research infrastructures
in the life sciences. The division was also an active partner in the CSA PerMed (2013-2015).
Within the applied ERA-Net on personalised medicine, DLR-PT and BMBF will act as an "institutional
couple": Decisions on political, strategic and budgetary issues are taken by the BMBF and DLR-PT will
speak and act according to these decisions.
Identification of the role:
Programme Owner and Manager N
Programme Owner Y
Programme Manager N
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
In the Health Research Framework Programme (2010), “Individualized Medicine” is one of six main
strategic foci. BMBF supports individualized/personalized medicine on various levels:
All six German Centres for Health Research take account of individualized medicine in their
respective research fields. It is their goal that new research findings can be translated quickly into
customized treatments. The Ministry also supports a wide range of projects on individualized medicine
ranging from basic research to applied and clinical research.
In its Action Plan for Individualized Medicine, the Ministry pools initiatives that open new
perspectives both for the treatment of patients and for innovations in the health industry.
The e:Med – Paving the Way for Systems Medicine Research and Funding Concept aims to establish
systems medicine in Germany. It promotes systems-oriented research into disease diagnosis and therapy
and preventive measures by linking mathematics and information science with clinical disciplines and
life sciences.
The Medical Informatics Funding Scheme aims to improve medical research opportunities and patient
care through innovative IT solutions that enable the use and exchange of data from health care and
research across institutions and locations.
ERA PerMed 69
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
In the funding measure i:DSem (Integrative Data Semantics in Systems Medicine), various
interdisciplinary research networks set out to deliver tools and services in order to homogenize and
categorize high-throughput data sets.
The recently established German Network for Bioinformatics Infrastructure (de.NBI) aims to
provide comprehensive first class bioinformatics services to users in basic and applied life science
research, as well as training and education.
BMBF has participated in various ERA-Nets such as E-Rare, ERA-CVD, Infect-ERA, TRANSCAN,
NEURON, ERACoSysMed, and in JPIs such as JPND, HDHL, and JPIAMR.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
DLR-PT acts in all tasks on behalf of BMBF.
Short profile of staff member(s) who will be undertaking the work
Dr. Johannes Mohr is assistant head of Division 614: Development of Methods and Structures in the
Life Sciences at the German Federal Ministry of Education and Research (BMBF). His responsibilities
include planning, implementing and supervising governmental strategies and research programmes in
the fields of bioinformatics, systems biology and systems medicine. He is member of the Executive
Committee of ICPerMed and administrative delegate of Germany on the ELIXIR board.
Dr. Mohr received his PhD from the Department of Computer Science and Electrical Engineering at the
Technische Universität Berlin in 2008. He was a research fellow at the TU Berlin and the Charité
University Medicine Berlin and a member of the Bernstein Center for Computational Neuroscience
Berlin. His research interests included machine learning and intelligent data analysis in the life
sciences. He joined the German Federal Ministry of Education and Research in 2016.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
The maximum contribution for the co-funded call will be 3.000.000 €.
DLR-PT will be responsible for the administration of the BMBF call contribution.
Financial support will be provided according to the funding rules of BMBF, which can be provided by
the staff members indicated above and/or assessed here: https://www.bmbf.de/en/index.html.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 70
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of DEUTSCHES ZENTRUM FUER LUFT - UND
12
Number organisation RAUMFAHRT EV, DLR
Short name DLR Country Germany
Brief description of the legal entity
DLR is a non-governmental, non-profit German research organisation. Its Project Management Agency
DLR is mandated by the German Federal Ministry of Education and Research (BMBF) and other
ministries with regard to implementation and management of governmental programmes for research
funding. Being a trustee for the funding budget, DLR administrates, with a staff of over 850,
approximately 1.1 billion € p.a. Fields covered – amongst others – are information technology, education,
environment, and life sciences. Within the life sciences, the “health” department of DLR manages
programs and projects in the areas of clinical and biomedical research for BMBF, administrating a total
of around 220 Mio € annually. The health department also hosts the National Contact Point Health and
manages funding measures for the innovation fund of the Federal Joint Committee (G-BA) of around
300 Mio € annually. Research falling within the definition of personalised/individualised or systems
medicine is being pursued in various BMBF funding initiatives and programs, which are administered
by DLR.
Within the applied ERA-Net on personalised medicine, DLR and BMBF will act as an "institutional
couple": Decisions on political, strategic and budgetary issues are taken by the BMBF and DLR will
speak and act according to these decisions.
Identification of the role:
Programme Owner and Manager N
Programme Owner N
Programme Manager Y
In case you are a Programme Manager, please name the respective Programme Owner or public
authority that is providing the mandate for your participation: The programme owner is the German
Federal Ministry of Education and Research (BMBF).
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
DLR is involved in many ERA-Net and JPI-initiatives. DLR has already participated in ERA-NETs under
the FP7 program such as E-RARE-2, NEURON II or ERA-Age. Furthermore DLR is coordinating or
participating on behalf of BMBF for example JPI-HDHL, JPI-AMR, JPND or the ERA-Net co-funds:
NEURON, E-Rare, TRANSCAN and ERA-CVD as well as the EDCTP under the H2020 program.
In the context of personalised medicine, DLR has coordinated the CSA PerMed resulting in the
publication of a strategic research and innovation agenda (SRIA) for personalised medicine. This SRIA
paved the ground for ICPerMed as well as this proposal for an ERA-Net co-fund on personalised
medicine. Also it manages a large and growing number of joint transnational calls (JTC) both within and
outside of ERA-NETs for BMBF, and is serving as call secretariat for many of them. Relevant know-
how is pooled and experienced personnel are available. Additionally DLR is coordinating the CSA
ICPerMed Secretariat since November 2016. On the national level DLR is supporting the BMBF in
implementing the German national action plan “Individualized Medicine” with a total budget of over 360
Mio. €.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
ERA PerMed 71
DLR will be contributing to six out of seven work packages. Associated with document
In particular DLR Ref. Ares(2017)5690678
will be WP leader - 21/11/2017
for
WP6 and will take over a joint call secretariat for one of the planned non-cofunded JTCs.
Additionally, it is currently acting as coordinator of the NEURON, ERA-CVD and JPI HDHL’s second
ERA-Net cofund. Other departments of DLR are coordinating or participating in many other ERA-Nets,
and there are regular meetings dedicated to discuss the experience with the various ERA-Nets. Also,
DLR manages a large and growing number of transnational calls both within and outside of ERA-Nets
and JPIs for BMBF, and is serving as call secretariat for many of them. Relevant know-how is pooled
and very experienced personnel available. Thus, DLR is fully capable leading WP6 and participating in
the other WPs.
Short profile of staff member(s) who will be undertaking the work
Dr. Katja Kuhlmann / DLR (female) obtained her PhD in biology from the University of Düsseldorf
in 2002. From 2003 - 2004, she was a postdoc fellow at the Max-Planck Institute for Experimental
Medicine in Göttingen. Following a parental leave, in 2007 she joined the Medical Proteome Center at
the University of Bochum, first as a postdoc fellow and later as a scientific group leader. Since October
2014, she works at DLR as a senior scientific officer and is involved in the coordination of national and
international funding programmes, mainly in the areas of personalised medicine and Ethical, Legal and
Social Aspects of modern life sciences. This includes the CSA PerMed and the call on Ethical, Legal
and Social Aspects of Neurosciences in the context of ERA-Net NEURON. Since November 2016, she
is involved in the coordination of the CSA ICPerMed Secretariat.
Dr. Wolfgang Ballensiefen / DLR (male) obtained his PhD in biology at the University of Göttingen
in 1997 and was a postdoc fellow at the MRC LMCB at the University College London until 2000. In
2000 he joined the DLR Project Management Agency (PT DLR) as senior scientific officer. Since then,
he has been involved in several funding programmes including innovative medicine, ageing research
and SIDS. He was significantly involved in the ERA-Net on Ageing (ERA-Age) joint transnational
funding program FLARE (Future Leaders of Ageing Research, 2007-2010). Furthermore he is the
coordinator of the newly established ERA-Net co-fund on cardiovascular research (ERA-CVD, 2015-
2020). From 2013 until 2015 he was coordinator for the CSA PerMed on Personalised Medicine, which
prepared the SRIA on Personalised Medicine and is facilitator of Challenge 2 of ICPerMed as well as
elected vice-chair of this consortium.
Do your national funding rules specify a maximum amount of financial N
support to a third party?
If yes, please insert the maximum amount [Euro]: --
Criteria for determining the exact amount under national funding rules
Please insert the reference (e.g. weblink) to the criteria for determining the exact amount under national
funding rules.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
DLR will be responsible for the administration of the BMBF call contribution. For amount and rules
see the description of BMBF. Financial support will be provided according to the funding rules of
BMBF, which can be provided by the staff members indicated above and/or assessed here:
https://www.bmbf.de/en/index.html.
Does the participant envisage that part of its work is performed by a N
linked third party?
If yes, describe the third party, the link of the participant to the third party, and describe and justify
the foreseen tasks to be performed by the third party
Does the participant envisage the use of in-kind contribution provided by N
third parties (Articles 11 and 12 of the Model Grant Agreement)?
If yes, describe the third party and their contributions
ERA PerMed 72
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
13 Federal Ministry of Health
Number organisation
Short name BMG Country Germany
Brief description of the legal entity
The German Federal Ministry of Health is responsible for a variety of policy areas, whereby its activities
focus predominantly on the drafting of bills, ordinances and administrative regulations. Moreover, by
means of prevention campaigns, the Federal Ministry of Health seeks to improve the population's health.
All in all, the sphere of activities pursued by the Federal Ministry of Health can be condensed into the
areas of health, prevention and long-term care.
Its Division 115 is particularly responsible for biotechnological innovations, which could improve the
health of people by either prevention or better treatment of diseases. Biotechnological innovations in this
means may include advanced therapies, nanotechnology-based or genetically engineered medicinal
products, respectively. Of particular interest in this regard is the concept of personalised medicine.
Therefore, Division 115 instructed the German Federal Institute for Drugs and Medical Devices to
participate actively in the CSA PerMed (2013-2015). Due to the overall importance of personalised
medicine, the German Federal Ministry of Health – represented by its Division 115 – is now participating
in IC PerMed.
Identification of the role:
Programme Owner and Manager N
Programme Owner (Y)
Programme Manager N
In case you are a Programme Manager, please name the respective Programme Owner
---
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
In course of the Health Research Framework Programme “Individualized Medicine” is one of six
strategic foci. Due to the federal structure of Germany, the DE-MoH is strategically, but not financially
engaged in the Health Research Framework Programme. For details of the programme is referred to the
Partner Description of the German Federal Ministry of Education and Research.
The DE-MoH is an associated partner in the European Research Area Network on Illicit Drugs
(ERANID).
Main tasks attributed the proposed action and the previous experience relevant to those tasks
It is planned that the DE-MoH will strategically contribute to all seven WP. Regarding the three
additional Joint Transnational Calls a financial engagement of the DE-MoH may be feasible.
Short profile of staff member(s) who will be undertaking the work
Dagmar Friese, Head of Division 115: “Genetic Engineering, Nanotechnology and Biotechnological
Innovations”,
Member of the Executive Committee of IC PerMed,
Pharmacist by education, former appointments: Federal Institute for Drugs and Medical Devices
(approval of drugs) and the EC (DG SANTE), more than 15 years of experience within the DE-MoH.
ERA PerMed 73
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Dr. Stephan Brandt, Deputy Head of Division 115: “Genetic Engineering, Nanotechnology and
Biotechnological Innovations”,
Biologist by education, former appointments (inter alia): University of Wales and Technical University
of Darmstadt (research on biotechnology and plant molecular biology), more than 10 years of
experience within the DE-MoH.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
N/A
Does the participant envisage that part of its work is performed by a linked third Y
parties.
VDI/VDE
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 74
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of Sächsisches Staatsministerium für Wissenschaft und
14
Number organisation Kunst
Short name SMWK Country GERMANY
Brief description of the legal entity
The Saxon State Ministry of Science and the Art (SMWK) is part of the executive power of the Free State
of Saxony (German Bundesland). The Free State of Saxony has a strong tradition in medical and life
sciences, microelectronics and engineering. In the year 2000, the Saxon Government implemented the
initiative “Biotechnology/Life sciences Offensive” in order to fuel growth of a related regional cluster by
spending over 200 Mio. EUR on promoting the infrastructure, R&D projects and business. In
consequence, a strong competence in medical and life sciences has developed at universities and non-
university research facilities as well as companies.
There are many activities in the Free State of Saxony, which deal with the area of personalised medicine.
Various activities in Leipzig in this scientific field are clustered in Leipzig, e.g. the large cohorts that
investigate diseases of civilisation (IFB Adiposity Diseases, LIFE Adult, LIFE Child, Nationale
Kohorte). The University Comprehensive Cancer Centre in Leipzig is developing strategies to e.g.
personalise pharmacotherapy for cancer patients. The activities of the Helmholtz Centre for
Environmental Research – UFZ focus research on epigenetic modifications contributing to asthma
development in children and young people. Large-scale networking with European and transatlantic
partners has already established cohorts such as LIFE Child as a partner/member of the European Birth
cohort network or Lipodystrophy Network Europe. Research projects translating basic science into
patient care are a staple at the University Medical Centre in Leipzig, for example cancer therapy and
psychotherapy. In addition to that, individual research grant applications targeting European Union,
BMBF and DFG as well as those supported by pharmaceutical companies or foundation are under way
in all departments of the University Medical Centre in Leipzig.
Medical research in Dresden also deals with the topic of personalised medicine, as it is viewed as one of
the main fields of oncology in the future. Research on personalised therapy is an important part of DKTK
German Cancer Consortium and the NCT – National Centre for Tumour Diseases. Dresden is one of the
eight members of DKTK und the NCT partner site of Heidelberg. At present, there are efforts to get more
support inside the NCT proof-of-concept-programme for early clinical studies. Several preclinical
projects and those regarding the investigation of patient material have already been granted.
Identification of the role:
Programme Owner and Manager Y
Programme Owner
Programme Manager
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
SMWK runs funding programmes spanning basic to applied research e.g. across all life sciences. Main
objectives of the programme “Saxon Research and Networking Programme within European Activities
for Research and Innovation” are the funding of networking activities and research projects in the frame
of European Initiatives like ERA-Nets and KICs in area of interest for the Free State of Saxony.
ERA PerMed 75
Associated with document
SMWK has been partner in the ERA-Net on Industrial Biotechnology (ERA-IB Ref. and
Ares(2017)5690678
ERA-IB 2)- 21/11/2017
since
2007 and ERA-Net COFUND on Biotechnologies (CoBioTech) since December 2016. Saxon researchers
have participated successfully in its calls. Within CoBioTech, the SMWK is responsible for establishing
a European Biotech Hub with all related strategic European Initiatives like ERA-Nets, PPPs, JTIs, ETPs,
ETPs, KICs and other stakeholder in the area life sciences and innovative technologies.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
As a partner in the ERA-Net COFUND ERA PerMed SMWK will participate in the Network Steering
Committee.
SMWK will participate on the co-funded call as Programme Owner and Manager and anticipated joint
calls in subsequent year, pending alignment with SMWK`s strategic plan.
SMWK will also participate in the envisaged additional activities.
The personnel involved have a depth experience in running joint calls for projects, monitoring and
policy activities.
Short profile of staff member(s) who will be undertaking the work
Mrs Gabriele Süptitz studied Chemistry at the Technical University of Dresden (TUD)/Germany. After
working as a scientist in the fields of organic chemistry, biochemistry and pharmaceutical chemistry at
TUD and industry (Apogepha and Arzneimittelwerk Dresden – companies developing and producing
pharmaceuticals) for 8 years, she moved to the Saxon State Ministry of the Environment and
Agriculture (SMUL) in 1993, where she was responsible for programmes in biotechnologies incl.
preparing calls for proposals, evaluating and managing projects at regional level, before moving to the
SMWK in 2012. There she is working for the department of European Affairs in Research and
Innovation.
In 2004-2006, Gabriele Süptitz worked as a National Expert (END) in the European Commission/DG
Research and Innovation/ Unit Policy and Strategy (later Biotechnology). She was involved in the
implementation of the Life Science and Biotechnology Action Plan, European Technology Platforms in
the area of Life Sciences and in launching, managing and monitoring of Specific Support Actions
(SSAs) related to policy and strategy. She was the representative of the Directorate in related
interservice groups and member of the FP7-working group in the Directorate responsible for
biotechnology.
She has represented the Free State of Saxony in the ERA-Net IB since 2008 and the ERA-Net
COFUND Biotechnologies since 2016.
Since 2007 she has been yearly acting as expert and rapporteur of the European Commission for the
evaluation of proposals within FP7 and Horizon 2020.
Further staff will be engaged if necessary.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
The estimated maximum amount for the co-funded call is 1.500.000 EUR.
Financial support will be provided according to the funding rules of SMWK, which can be provided by
the staff members indicated above and/or assessed here: http://www.smwk.sachsen.de.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 76
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of Nemzeti Kutatási, Fejlesztési és Innovációs Hivatal, (National
15
Number organisation Research, Development and Innovation Office)
Short
NKFIH (NRDI) Country Hungary
name
Brief description of the legal entity
The National Research, Development and Innovation Office (NKFIH) was founded on 1 January 2015
by the Act “about scientific research, development and innovation” (Act2014/LXXVI) of the Hungarian
Parliament (RDI law) with the aim to create a stable institutional framework for the governmental
coordination of the national research, development and innovation ecosystem, provide predictable
funding and implement efficient and transparent use of available resources.
The NKFIH of Hungary is a national strategic and funding agency for scientific research, development
and innovation, the primary source of advice on RDI policy for the Hungarian Government, and the
primary RDI funding agency. The NKFIH manages the National Research, Development and Innovation
Fund (NRDI Fund) “to provide state support for research, development and innovation.
Mission
To develop RDI policy and ensure that Hungary adequately invest in RDI by funding excellent research
and supporting innovation to increase competitiveness.
Mandate
To prepare the RDI strategy of the Hungarian Government, to handle the National Research,
Development and Innovation Fund, and represent the Hungarian Government and the Hungarian RDI
community in international organizations.
Vision
To be a world-class RDI funding agency, create an internationally attractive RDI environment in
Hungary, and a stronger link of RDI to the economy and society to increase growth and prosperity.
Identification of the role:
Programme Owner and Manager Y
Programme Owner N
Programme Manager N
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
The RDI law created a unified National Research, Development and Innovation Fund (NRDI Fund)
to provide state support for research, development and innovation. In its annual programme strategy, a
specific budget line is defined for the support of Hungarian participation in Horizon 2020, as well as
related joint programmes. Among other international programmes, this provides for support of Hungarian
participants in calls published within the framework of ERA-NETs.
The NKFIH offers support for the participation of Hungarian research entities in a variety of joint
programmes and initiatives. The NKFIH has participated in a number of ERA-NETs including joint calls.
ERA PerMed 77
The most relevant ERA-NETs related to Health research are:Associated with document
Infect-ERA Ref. Ares(2017)5690678 - 21/11/2017
(http://www.infect-era.eu/), E-
Rare-3 (www.erare.eu), HIVERA (http://www.hivera.eu), FLAG-ERA https://www.flagera.eu,
EuroNanoMed (http://www.euronanomed.net) EuroTansBio (https://www.eurotransbio.eu/).
Furthermore, NKFIH participates in the EU Joint Programme – Neurodegenerative Disease Research
(JPND), in the AAL Joint Programme, as well as in the ECSEL Joint Technology Initiative, in EUREKA
and in EUROSTARS, and has numerous bilateral international agreements for joint programmes.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
The NKFIH will take part in Work Package 3 (Evaluation and proposal selection of the co-funded call)
and in Work Package 6 (Additional Joint Transnational Calls).
Since the NKFIH has participated in many ERA-NETs, the NKFIH has experience contributing to tasks
related to the management of joint transnational calls.
Short profile of staff member(s) who will be undertaking the work
Dr. Klára Horváth works as a project officer at the Department of International Affairs at the National
Research, Development and Innovation Office (NKFIH). She studied Physics at the Eötvös University
in Hungary, and obtained a PhD degree in Experimental Molecular Biophysics at the Royal Veterinary
and Agricultural University in Denmark in 2001. After that she was a Marie Curie postdoctoral scientist
at the Biology Department at University of York in England. She joined the Department of Programme
Planning Department of the National Office for Research and Technology (former NKFIH) in 2009
where she fulfilled project management and international tasks. Between 2009 and 2012 she took part in
the management and monitoring tasks of Life Science Subprogram of the Hungarian National
Technology Programme, worked as an FP7 BIO National Contact Point (NCP) and took part in the
EuroNanoMed and EuroTransBio ERA-NET Programmes. At present she is working in H2020 Health
related projects and programmes; she is the Health NCP, represents Hungary in the Health Programme
Committee, in the Innovative Medicines Initiative States Representatives Group and in the JPND
Management Board.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
The maximum amount of funding is not defined under national rules, but may be specified in the annual
call for proposals or may be limited by the total amounts available for such calls. Financial support will
be provided according to the funding rules of NKFIH, which can be provided by the staff members
indicated above and/or assessed here: http://nkfih.gov.hu/english.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 78
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant
16 Name of organisation Health Research Board
Number
Short name HRB Country Ireland
Brief description of the legal entity
The Health Research Board (HRB) is a statutory agency under the aegis of the Department of Health
Ireland. HRB is the lead agency responsible for funding health research information and evidence.
Identification of the role:
Programme Owner and Manager N
Programme Owner N
Programme Manager Y
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
H2020-SC1-2016-2017 ERA-NET Cofund on Personalised Medicine. The proposed ERA-Net
Cofund (hereinafter ERA PerMed) will coordinate research efforts of the participating partners and
third countries in the field of personalised medicine. The main scope of ERA PerMed is planning,
implementing, monitoring and disseminate up to four joint transnational calls (JTC) to fund
multidisciplinary research projects. Dr Mairead O’Driscoll is chair of the International Consortium for
Personalised Medicine (IC PerMEd).
Main tasks attributed the proposed action and the previous experience relevant to those tasks
Task 7.4: Relationship with patient representatives (Task leader: ZonMW; Contributors: CHIR, HRB)
Successful implementation of PM will be achieved only if all stakeholders, including patients and
citizens, are empowered and develop the required awareness about PM. Public engagement in PM can
be increased by enabling citizens to become actively involved in all phases of research and
development. The objective of this task is to optimize patient (and citizen) empowerment in
personalized medicines by ensuring that their perspectives and needs are represented accurately in all
applicable aspects of this ERA PerMed. In order to do so, this task focuses on the identification and
implementation of ways to involve patients’ input for international research topic prioritization and for
the evaluation of expected results in proposed projects for future potential clinical, public health and
social benefits. To facilitate this process, this task will benefit from the unique expertise pertaining to
patients’ engagement developed in Canada, on the focus recently developed by ZonMw and also by
directly engaging patients’ and users’ associations
This task is expected to:
Identify and prepare a list of international/European patients’ organisation to be selected for
patient representation (month 1).
Explore the patient participation in joint calls for proposals (month 1).
Identify processes in ERA PerMed in which the voice of the patient/citizen should be heard, the
ways to care for that and implement these in the ERA-net. (Note: we can prepare and propose
such to the processes to the partners and implement it) (month 2-10).
ERA PerMed 79
contribution,
Develop the means for the patient-representatives’Associated the impact, input, and the
with document Ref. Ares(2017)5690678 - 21/11/2017
appropriateness of their participation at different levels in the ERA PerMed call process (month
29).
The HRB are developing a number of different ways of supporting public and patient participation
(PPI) in health research, building on ongoing and previous work. These include funding PPI directly
and indirectly through medical research charities, patient organisations and dedicated PPI funding calls.
They also include the integration of PPI into grant review and management processes
Short profile of staff member(s) who will be undertaking the work
Dr Ellen Moran is the Lead Programme Manager for Investigator-Initiated Research and Innovation in
the Pre-Award Team at the HRB.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
Tentative funding commitment: €370,000. Financial support will be provided according to the funding
rules of Health Research Board, which can be provided by the staff members indicated above and/or
assessed here website of the agency: http://www.hrb.ie/research-strategy-funding/policies-guidelines-
and-grant-conditions/policies-and-position-statements/approval-of-host-institutions.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 80
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant
17 Name of organisation Chief Scientists Office, Ministry of Health
Number
Short name CSO-MOH Country Israel
Brief description of the legal entity
The Chief Scientist Office (CSO) of the Israeli Ministry of Health (MOH) through its Medical Research
Administration is a pivotal organization in Israel for managing and funding of Bio-Medical and Medical
research.
Our strategic approach is to support investigator-initiated, health-related research projects performed in
hospitals, universities and research institutes.
Grant proposals sent in response to public calls for Applications issued by the Research Fund, are peer
reviewed in various research-disciplines review committees (Study Sections). Funding of feasibility
studies and fellowships to Physicians-Researchers is also available. CSO-MOH is also mandated to
regulate animal experimentation, genetic human experimentation and homeland security aspects of
biomedical research in Israel.
Identification of the role:
Programme Owner and Manager Y
Programme Owner
Programme Manager
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
CSO-MOH is currently a partner in several active ERA-Nets and JPIs in the field of health, including:
CVD, CASyM, ERACoSysMed Infect-ERA, E-RARE-3, TRANSCAN-2, , NEURON III,
EuroNanoMed III JPND, JPIAMR, JPI-EC-AMR JPco-fuND, CoBioTech, TO-REACH.
CSO-MOH is an active partner in these initiatives (see below). CSO-MOH funds research in all fields of
Health and strives for promoting health by increasing multi-national cooperation in research.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
CSO-MOH is an active partner in the above initiatives.
CSO-MOH is a WPL and TL in some of the above mentioned ERA-NETS.
CSO-MOH takes upon itself to lead the tasks of communication/dissemination and on Science to
Society as it did in the previous ERA-PathoGenoMics, EuroNanoMed2, ERA-Neuron and Neuron II. It
currently leads the task of communication and dissemination in EuroNanoMed3, Infect-ERA, E-Rare,
Era-CVD, Neuron 3. CSO-MOH is a task leader of social media in the JPIAMR. This is done by
maintaining (past/present) an interactive teaching tool, produced short explanatory video clips, flyers,
newsletters, brochures and press releases in addition to constructing and maintaining social media.
Dissemination is carried out nationally and internationally, by active presentations in meetings,
stakeholders' mailing lists and electronic portals (e.g. business wire).
Based on our previous experience, CSO-MOH will be responsible for the communication tasks of this
ERA-NET and will be a TL in monitoring and assessment of the projects funded through the ERA-NET
Cofund.
Short profile of staff member(s) who will be undertaking the work
ERA PerMed 81
Prof. Avi Israeli, MD, is the Chief Scientist at the Ministry ofAssociated with document Ref.He
Health (CSO-MOH). Ares(2017)5690678
is a specialist -in21/11/2017
internal medicine and the current head of the Department of Health Policy, Health Care Management and
Health Economics at the Hebrew University – Hadassah Faculty of Medicine. Prior to this, he was the
Director General of the Israel Ministry of Health (2003-2009) and the Director – General of Hadassah
Medical Organization (1998 -2001). Prof. Israeli is an NSC member in several ERA-Nets, CSAs and JPIs.
Dr. Yahaloma Gat is the Senior Scientific Director at CSO-MOH. She received her PhD (Bio-Chemistry
1996) from the Weizmann Institute of Science and her Master Degree (2012) in Public Policy from the
Hebrew University. Prior to her work at the CSO-MOH, she held the position of a Scientific Advisor at
GIF, German Israel Foundation for Scientific Research (2000-2011). Dr. Gat sits on various Bio-Ethical
Committees, such as the High Genetic Committee for Experiments in Human Beings and the Committee for
Gene Therapy. Dr. Gat also sits on the National Committee for Experiments in Animal Models.
Dr. Ahmi Ben-Yehudah is the Director of Research Administration at the Ministry of Health. He received
his PhD in 2003 from the Hebrew University. Prior to his work at the Ministry of Health, he held the
position of Director of Bio-Medical Research at the Ministry of Science and Technology (2011-2013). Dr.
Ben-Yehudah is an NSC member in several ERA-Nets, CSAs and JPIs.
Dr. Irit Allon, DMD, is the national coordinator of several ERA-Nets and JPIs in the CSO-MOH. She is a
specialist in Oral pathology, and since 2005 has gained experience in managing ERA-Nets and leading the
Science to Society and Communication & Dissemination activities. She is the former national coordinator
of ERA-NET PathoGenoMics, ERA-Age1 and 2, FUTURAGE and the current liaison of E-RARE, Infect-
ERA, EuroNanoMed2, and JPIAMR at the CSO-MOH.
Dr. Ayelet Zamir is the national coordinator of several ERA-Nets and JPIs in the CSO-MOH. She
received her PhD in Human Genetics from the Faculty of Medicine, Hebrew University in Jerusalem. Prior
to her work at the Ministry of Health, Ayelet worked in Hong Kong for three years as a projects manager in
global environment. Ayelet is the national coordinator of several ERA-Nets as NEURON, ERACoSysMed,
TRANSCAN, and JPIAMR at the CSO-MOH.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
Per call rules, maximum funding is 100,000 Euro. Researchers may apply up to this sum. CSO-MOH
intends to fund two Israeli researchers in this call. Financial support will be provided according to the
funding rules of CSO-MOH, which can be provided by the staff members indicated above and/or
assessed here: https://www.health.gov.il/English/MinistryUnits/PH/Scientist/Pages/default.aspx.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 82
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant
18 Name of organisation Ministero della Salute
Number
Short name IT-MoH Country Italy
Brief description of the legal entity
The Ministry of Health(MoH) represents the central level of the Italian National Health Service
and is responsible for overall planning and control and to establish the Italian NHS targets and
most important measures to be implemented.
The Ministry is the leading body of the national information system on health, which includes
data on hospital admission and health interventions; the Ministry is also responsible for the
overall coordination of Prevention Programmes, including those for elderly and disabled people,
in particular correct life-style promotion, surveillance of chronic diseases and c.d. risk factors,
promotion and surveillance of secondary prevention. The Ministry is entitled of the resource
management of operational Health research, and it is also the Governing body for the legislation
on Medical Devices and Health Professionals. The participating Directorate General for
Research and Innovation in Health performs, among others, the following functions:
promotion, development, monitoring and evaluation of results of scientific and technological
research in the health field and of experimental processes for innovation;
financing and public-private co-financing of research in health;
promotion of and support to the creation of highly specialized and technologically advanced
networks of excellence for research and assistance;
promotion and coordination of health research activities of high quality and impact in the
European context;
participation in the activities of international and supranational organisations in the field of
health research, with support to the establishment of research infrastructures of European
dimension in adherence to the programs of the European Union.
Website: http://www.salute.gov.it
Identification of the role:
Programme Owner and Manager Y
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
The Ministry of Health is the main public body funding biomedical research and biomedical
innovation in Italy. As a strategic health policy instrument, the Italian the Ministry of Health
runs two types of funding programmes in the fields of biomedicine: one on current research and
another on targeted research.
Current research funding is available to Scientific Institutes of Research, Hospitalisation and
Healthcare, whereas the targeted research funding is open to all researchers of the National
Health System. Both programmes constitute priority initiatives for the improvement of the
population’s health through the rapid translation of research results into new or improved
preventive, diagnostic, and treatment products and processes, and incorporation into health
policies and practice.
At present, the MoH-IT is involved in the following European health research programmes:
Joint Programming on Neurodegenerative Disease (JPND) and JPco-fuND
ERA-NET NEURON
ERA-NET TRANSCAN-2
ERA-NET on CardioVascular Diseases (ERA-CVD)
Joint Programming Initiative on AntiMicrobial Resistance (JPI AMR) III
ERA PerMed 83
ERA-NET E-Rare Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ERA-NET Infect-ERA
ERA-NET EURONANOMED 2
ERA-NET on Collaboration on System Medicine (ERA-CoSysMed)
Joint Programming Initiative More Years Better Lives (JPI - MYBL)
ERA-NET for Latin American and Caribbean States II (ERA-NET-LAC II)
Active and Assisted Living - 2 (AAL- 2)
The MoH-IT is currently involved in the preparation of the International Consortium for
Clinical Trial, playing a leading role in the elaboration of the corresponding roadmap.
The MoH-IT is also committed to support the ESFRI Research Infrastructures in the biomedical
science sector, ECRIN, EATRIS and BBMR.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
MoH will participate in WP1 (Task 1.5 Liaison with IC PerMed), WP2 (Task 3.2 Review of
pre-proposal; Task 3.3: Review of full proposal), WP4 (Task 4.1 Definition of indicators to be
used for the evaluation of ERA-Net Cofund PerMed projects and assessment of the outputs of
the co-funded call; Task 4.2 Set up the plan for information and data collection and
managemen; Task 4.4 Follow-up of monitoring activities of ERA-Net funded projects t), WP5
(Task 5.1: Communication and dissemination on the launch of the cofunded call; Task 5.2:
Communication and dissemination of the results of the cofunded call; Task 5.3: Communication
and dissemination of projects´ follow up) ; WP6 (as Task Leader 6.4 Third call JTC2021), Task
6.5: Communication, exploitation and dissemination of results fromnon‐co‐funded calls and
WP leader of WP7 (Strategic supporting and relationship activities to ensure relevance, impact
and sustainability of ERA PerMed work).
Short profile of staff member(s) who will be undertaking the work
Dr. Gaetano Guglielmi is the Head of the III Office of Health Research, DG for Health
Research and Innovation. He represents the Italian Ministry of Health in all EU initiatives in
which the DG for Health Research and Innovation is involved.
Dr. Guglielmi will be assisted by the following office members of the International Research Co-
Operative Group MoH-IT/ISS of the Italian Ministry of Health: Mrs Maria Grazia Manzini and
Dr. Maria Josefina Ruiz Alvarez.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
Contribution to the co-funded call: 1.5 M€.
Information on the funding rules applied by MoH can be found on the website page dedicated to
the yearly national calls (Bando ricerca corrente): http://www.salute.gov.it
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 84
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of Regional Foundation for Biomedical Research -
19
Number organisation Fondazione Regionale per la Ricerca Biomedica
Short name FRRB Country ITALY
Brief description of the legal entity
The Lombardy Foundation for Biomedical Research (Fondazione Regionale per la Ricerca Biomedica
- FRRB) is an entity governed by public law, a non-for-profit organization, established in October 2011
by Regione Lombardia, with the aim of promoting and supporting scientific research in Life Sciences
in Lombardy (100 Million € from 2011 have been committed in innovative R&D projects so far). The
Foundation represents the main strategic platform for boosting progress, research, development and
innovation within the health sector among the regional academic and industrial life science players. Its
raison d'être is to serve as support to and for implementing the regional health care research policy, in
order to place the Lombardy regional system in a leading position in Europe within this field. In
addition, the Foundation aims to distribute local and European resources to innovative basic and
translational research projects which enable a positive impact on the local health care eco-system and
citizens.
Main Activities:
Promote research and innovation in Lombardy by assigning regional funds to basic and
translational research projects through public tenders and calls for proposals as to create a
financially sustainable and suitable environment for adding value to biomedical projects focused
on different pathological conditions including rare diseases.
Through R&D infrastructures, support and coordinate the implementation of scientific research
on disease prevention, personalized medicine, medical devices and drug manufacturing and
distribution.
Support and promote local and national technological clusters in life sciences, thus enabling a
better coordination of research agendas in the biomedical field, as well as a more productive use
of the available funds.
Attract European and International research funds to Lombardy by participating to European
projects, as those in the EU HORIZON 2020 research and innovation funding program, and
international partnerships.
Add value to funded projects derived research results through technology transfer activities in
order to support and promote the development of new treatments, therapies and devices for the
diseases of interest.
Promote the dissemination of scientific knowledge and culture including Responsible Research
and Innovation (RRI) principles and promoting a gender balance among Research Funding
Organisation (RFOs) and Research Performing Organisations (RPOs).
Main National and International Projects:
1. IC PERMED: FRRB is part of the Executive Committee of IC Permed and participates to the
implementation of the roadmap in liaison with the Italian ministry of Health;
2. ERA-NET Transcan 2: FRRB is part of the call steering committee for the Joint Transnational
call 2016 and has committed 1 Million € for the call. The support will continue in the JTC 2017.
3. TITTAN (Interreg Europe): Fostering the design, uptake and use of innovative technology
based products and solutions for a healthy and active ageing.
4. TARGET: TAking a Reflexive approach to Gender Equality for institutional Transformation.
We are partner of the project whose aim is to contribute to the advancement of gender equality
in research and innovation (R&I) by supporting a reflexive gender equality policy in seven
Gender Equality Innovating Institutions (GEIIs) in the Mediterranean basin.
ERA PerMed 85
5. ESTHER: Emerging and Strategic Technologies forAssociated with document
HealthCare: We areRef.
in Ares(2017)5690678
the task force of- 21/11/2017
the European Commission which is setting up the ESTHER initiative with a provisional
budget of about 6 Billion €.
Identification of the role:
Programme Owner and Manager Y
Programme Owner Y
Programme Manager Y
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
The research programme is approved yearly by the board of directors and accepted by the Regional
council. Since 2016 the programme has been focusing specifically on the theme of personalised
medicine. Several projects within this topic have been financing.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
FRRB leads the following tasks in the Action:
Task 1.6: Exploring new partnerships in transnational funding
Task 4.1: Definition of the indicators, sampling methods and plan for information and data collection
and management
Task 4.3: Follow-up of monitoring activities and decision making
Task 6.4 Fourth call JTC 2021 [in cooperation with the National Ministry of Health]
FRRB leads the WP4 titled «Monitoring and assessment of the projects funded through the Personalised
Medicine co-funded call » and It’s responsible for the implementation of the “monitoring and
assessment of the project financed through the co-funded JTC”. As leader of the Task 1.6, FRRB is in
charge for enlarging the number of participating funding organisation (national and regional) in order
to maximise the impacts of the Joint Transnational Calls. As Task 4.1 leader FRRB is responsible of
coordinating the work with all the other partners in order to deliver consistent evaluation indicators.
As leader of the Task 4.3 FRRB will be in charge for analyse the results and stimulate the most
appropriate decision from the Executive Committee.
Lastly, as leader to the Task 6.4, we will coordinate, in cooperation with the Italian ministry of health,
the fourth additional Joint transnational call, sharing with the latter the responsibility of the secretarial
activities.
Short profile of staff member(s) who will be undertaking the work
Marina Gerini (f) is General Manager at FRRB. She obtained her degree cum laude in classic
literature in 1981 at University of Florence. Since 1983 she became a civil servant and started her carrier
in the Public Administration. In 1997 she became manager in the Lombardy Government serving at DG
Family with responsibility of financial and human resources and between 2004 and 2005 she covered
the interim position as responsible of public health interventions.
In 2005 she was responsible of the Central DG for external and International Relations till 2009
Between 2009 and 2011 she became General Manager of Directorate General for Social Associations
and Volunteering Organisation Associations at the National Ministry of Labour and Social Policy.
Between 2011 and 2013 she covered the position of General Secretary of the Lombardy Assembly and
was responsible of coordinating the work between the regional activities, the regional and national
Government, as well as of realisation of the activities and programmes of the national presidency of the
council of ministries.
From 2013 to 2014 she was director at Regional agency for transparency and anti-corruption.
ERA PerMed 86
From 2014 to 2015 she was appointed as Special Manager at Associated
Melegnanowith document
GeneralRef.hospital.
Ares(2017)5690678 - 21/11/2017
In 2015 she was appointed as Social Director of the at Primary Care Trust (the Italian Azienda Sanitaria
Locale) Milano 1 and in 2016 she was appointed as socio medical Director and PCT West Milano.
Since February, 2nd 2017 she is General Manager at Lombardy Foundation for Biomedical Research.
Gianni D’Errico (m) is the European Funding Officer at FRRB. He Obtained his degree cum laude
in International Relations At Napoli University Federico II. He obtained his Post Graduate master’s
degree in Project Management In Rome and a certification in IP Management at University of Bonn
(DE).
He started his professional Experience In Brussels managing R&D project within FP7 in Brussels in
the Energy and Environment Sector. In 2013 he moved in Slovenia where he has gained an extensive
experience on the R&D project in Health Sector for the main International players (Novartis, Sandoz,
Lek, Merck, Millipore, Karlsruhe Institute of Technology, etc.). In 2015 he moved back in Milan
where he currently is European Funding Officer at Regional Foundation for Biomedical Research.
Main Projects and programmes managed:
1. ERANET Transcan 2 JTC 2016: He has coordinated the participation of the regional
government, through FRRB, to the ERENAT Transcan 2 and has supervised the funding process
in accordance to the national and regional rules.
2. IC-PERMED: International Consortium on Personalised Medicine. The aim of the project is to
set up the secretarial support to the further ERANET on personalised Medicine.
3. TITTAN (Interreg Europe): he is responsible for the correct implementation of the project
whose main aim is fostering the design, uptake and use of innovative technology based
products and solutions for a healthy and active ageing.
4. ESTHER: Emerging and Strategic Technologies for Healthcare: He has been supervising the
adherence for the Regional government to the initiative and coordinate the working group on
interregional cooperation.
5. NextBiopharmDSP: Implementation of a fully integrated manufacturing platform for biosimilar
mAb based on continuous chromatography, in combination with single-use disposable
technology for all unit operations of DSP on pilot/small production scale together with
incorporation of advanced analytical tools.
Scientific Committee
Our foundation, in the implementation and management of its daily activities, is supported by a team
of 7 highly regarded scientists in the field of life sciences (most recognised scientists, Director and
Scientific directors of local R&D Health Organisation).
The recruitment is currently ongoing. We will publish the names and roles of the people as soon as they
accept their mandate.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
For 2017 we have allocated up to 4.000.000 EUR (4 Million euros) for the Eranet Cofund proposal.
The same amount of money will be allocated for the PerMED ERANET non cofounded JTC.
Financial support will be provided according to the funding rules of FRRB, which can be provided by
the staff members indicated above and/or assessed here: http://www.frrb.regione.lombardia.it.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 87
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of Valsts izglītības attīstības aģentūra – State Education
20
Number organisation Development Agency
Short name VIAA Country Latvia
Brief description of the legal entity
The State Education Development Agency (VIAA) is a governmental institution under the direct
auspices of the Ministry of Education and Science (MoES). The main tasks of the Agency are
Implementation of European Union programmes, structural and financial instruments in the area of
education and science. According to the Decision of The Cabinet of Ministers, Republic of Latvia
(Provisions Nr 572, 23.09.2014: Changes in the provisions No 934, 18.12.2012 “Regulations of State
Education Development Agency”), official publication 31.10.2014, the Latvian National coordination
functions for European Union Research and Innovation programme Horizon2020 as well as functions
related to European Research area (ERA) instruments, in particular – ERA-NET, ERA-NET COFUND,
Article 185/187 initiatives, are the competence of the Agency. As of January 2015, the Agency is the
owner and manager of the National programme „Participation in International Co-operation
Programmes in the Fields of Research and Technologies” comprising the Latvian national funding
instrument for participation in all ERA-NET and ERA-NET COFUND scheme projects. VIAA is the
signatory for ERA-NET Cofunds HERA, COBITE, EURONANOMED-III, ERA-CVD, NEURON-
Cofund, SuSAN, JPI-EC-AMR, ENSUF, ENSUGI, T2S.
VIAA is the funding body for European Joint programmes:
Fusion
Fission
European Human Biomonitoring programme
Identification of the role:
Programme Owner and Manager YES
Programme Owner NO
Programme Manager NO
In case you are a Programme Manager, please name the respective Programme Owner
State Education Development Agency is the owner and manager of the National programme „Support
to Participation in International Co-operation Programmes in the Fields of Research and
Technologies”, provisions of the Cabinet of Ministers No 259, 26.05.2015.
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
VIAA will participate in HERA JRPs based on National programme „Participation in International Co-
operation Programmes in the Fields of Research and Technologies”.
Experience: VIAA has been managing Latvian participation in bilateral programmes in education and
science, ERASMUS/ERASMUS+, COMENIUS, Leonardo da Vinci, Jean Monet programme. Latvian
National coordination functions for European Union Research and Innovation programme
Horizon2020 as well as all functions related to European Research area (ERA) instruments, in
particular – ERA-NET, ERA-NET COFUND, Article 185/187 initiatives are in the scope of VIAA
responsibility.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
VIAA participates both in the PERMED joint call and in the additional activities:
WP3: Evaluation and proposal selection of the co-funded call
WP5: Communication and dissemination of the ERANET PM co-funded projects
ERA PerMed 88
WP6: Additional Joint Transnational Calls Associated with document Ref. Ares(2017)5690678 - 21/11/2017
WP7: Strategic supporting activities to ensure relevance, impact and sustainability of ERA PerMed
work
Previous experience of organisation: VIAA is the Latvian national host for all European educational
and training programmes, structural fund instruments in education and science, bilateral programmes
in science. VIAA is the Latvian funder and signatory for ERA-NET Cofunds HERA, E-RARE, ERA-
CVD, SuSAn, ERA-GAS, NEURON-Cofund, JPI-EC-AMR and successfully executes relevant
Cofund activities. Social sciences portfolio – ENSUF, ENSUGI, T2S. Humanities portfolio – in ERA-
RUS+ as in geographical ERA-NET.
VIAA is the funding body for European Joint programmes:
Fusion
Fission
European Human Biomonitoring programme
Short profile of staff member(s) who will be undertaking the work
Dr Maija Bundule (female), Head of the Division of International Research programmes, VIAA.
Maija has more than 20 years experience in scientific collaboration activity management on
international scale. Maija has a broad experience in managing Latvian participation in EJP and ERA-
NETs across all areas.
Dr Uldis Berkis (male), Senior Expert, VIAA. Participates in management of Latvian participations in
ERA since 2007. Has a broad experience in managing Latvian participation in ERA-NETs in Health
and KBBE areas. NCP/PC Health and Research Infrastructures. EJP HBM.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules[1].
The amount reserved for call contribution is specified in Grant Agreement. VIAA will participate in
co-funded calls and eventual non-cofunded calls. The indicative contribution is 300 KEUR to
cofunded call which can be supplemented by EC funding; to non-cofunded calls 210-300 KEUR.
VIAA has to fund Latvian partners in a way conform to national regulations, especially VAT
regulations which have been altered recently. Support rate to companies correspondingly to EU
Regulation 651/2014.
Does the participant envisage that part of its work is performed by a linked third NO
parties[2].
If yes, describe the third party, the link of the participant to the third party, and describe and justify
the foreseen tasks to be performed by the third party
Does the participant envisage the use of in-kind contribution provided by third NO
parties (Articles 11 and 12 of the Model Grant Agreement)
If yes, describe the third party and their contributions
[1]
This information is required by the financial regulation. If no maximum amount of financial support is defined under national
funding rules please put the amount for call contribution.
[2]
A third party that is an affiliated entity or has a legal link to a participant implying a collaboration not limited to the action.
(Articles 14 of the Model Grant Agreement).
ERA PerMed 89
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
21 Fonds National de la Recherche
Number organisation
Short name FNR Country Luxembourg
Brief description of the legal entity
The National Research Fund (FNR) was set up by the Law of 31 May 1999. Through the FNR, an
additional impetus was given to Luxembourg research, with the aim to create and strengthen competences
and knowledge and to develop national and international synergies in order to increase the attractiveness
of Luxembourg as a scientific and economic site of excellence.
Since 2000, several multi-annual research programmes have been launched in specific fields of interest
to Luxembourg. Calls are addressed to public institutions, Luxembourg administrations and public
establishments authorised to undertake R&D activities or technology transfer in their respective fields of
activity.
As an outcome of the 2007 Foresight Exercise and the subsequent choice of national research priorities
by the Government, the thematic research programme CORE was launched in 2008 with the prime
objective fostering scientific quality in selected areas of Luxembourg public research.
The FNR also regularly launches calls in the three structural programmes: ATTRACT (Attract
Researchers to Luxembourg), the PEARL (Excellence Award for Research in Luxembourg) and the
INTER (Promoting International collaboration).
The FNR is also in charge of the Luxembourg research grants for PhDs and post-docs. In 2015 a new
programme for doctoral training (PRIDE) was launched, awarding blocks of PhD grants to excellent
teams of researchers grouped around a coherent research&trainig programme. Furthermore, the FNR
subsidises accompanying measures, addressed to a larger public and aiming to strengthen the general
framework of scientific research in Luxembourg. The FNR also wishes to strengthen the links between
science and society and the general public to feel concerned with science. Activities for promoting
scientific culture are mostly targeted to young people.
FNR funds running research projects within the biomedical field through its CORE programme, which
has an annual budget of approximately 4 Mio € and covers the following areas: Regenerative Medicine
in Age-related, Translational Biomedical Research and Public Health research.
Identification of the role:
Programme Owner and Manager Y
Programme Owner
Programme Manager
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
With the support of the FNR a first National Centre of Excellence in Research was set up in 2015 on the
topic of Early Diagnosis and Stratification of Parkinson’s Disease. FNR also participates within
BMBF/e:Med to fund systems medicine research consortia with a budget of up to EUR 2 M to support
the Luxembourgish partners in German-Luxembourgish consortia.
At an international level, the FNR has participated/currently participates to the following initiatives:
- ERA-Nets: TRANSCAN, NEURON I and II, ERA-SysAp, MATERA, MNT, ERA-SysBio, ERA-
Age, HERA, CHIST-ERA, CORE Organic, NORFACE, M.ERA-NET
- Coordinated Actions: CoA-SysMed, CoA-PerMed;
- JPI: Joint programming in neurodegenerative diseases;
- Agreements with 17 funding agencies in Europe and beyond to fund bilateral research projects.
ERA PerMed 90
By participating to these initiatives, the main objective of theAssociated
FNR iswith document
foster Ref. Ares(2017)5690678
cooperation - 21/11/2017
and coordination
of research activities carried out across Europe and beyond, and to increase visibility of Luxembourg
research in selected domains.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
FNR will participate in the co-funded call. It will contribute to the overall implementation of the co-
funded call by commenting on the proposed call text and other call documents, publication and promotion
of the call, eligibility check of candidates applying for FNR support and participation in funding decision.
In addition, FNR will participate in additional activities by contribution to the workshops in which the
topics of the additional activities will be determined (task 6.1) and by participating in the additional JTCs
(tasks 6.2 and 6.3).
FNR has been a partner in a range of other ERA-Nets (c.f. above).
Short profile of staff member(s) who will be undertaking the work
Marie-Claude Marx, Ph.D. works at the FNR since 2007 and has a background in biological and
environmental sciences. She recently coordinated the development and implementation of the new FNR
funding instrument for doctoral training PRIDE. Moreover, she is programme manager of the
environmental sciences research programme (CORE Sustainable Resource Management).
She benefits from previous participation at international level, notably her involvement in the European
Science Foundation (ESF) and in the EU SGHRM Working Group on “Innovative Doctoral Training”.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
300.000 Euro. The amount has to be approved by the FNR Board of Administration. Financial support
will be provided according to the funding rules of FNR, which can be provided by the staff members
indicated above and/or assessed here: https://www.fnr.lu.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 91
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
22 The Research Council of Norway
Number organisation
Short name RCN Country Norway
Brief description of the legal entity:
The Research Council of Norway is a national strategic and funding agency for research activities, and
a chief source of advice and input into research policy for the Norwegian Government, the central
government administration, and the overall research community. An important objective is to ensure
that Norway adequately invests in research and development activity, to identify Norway’s research
needs, and to recommend national priorities. Using targeted funding schemes, the Council helps to
translate national research policy goals into action. Using "bottom up" schemes the Council fosters
research of the best scientific quality.
The Research Council works to promote high-calibre research and win greater acknowledgment of
research as a cultural, value-creating force that fuels social development. A knowledge-based society is
dependent on a research establishment that is at the cutting edge internationally. The Research Council
seeks to strengthen the international position of Norwegian research together with other players in the
research system.
Four key challenges
To enhance the capacity and quality of Norwegian research.
To strengthen research in areas of particular importance for research, trade and industry, and
society at large.
To promote constructive cooperation, distribution of responsibility and structures in the research
system.
To translate research results into action.
Norway has one single research council, hence the RCN covers all subjects fields and discipline and all
kinds of R&D carried out in the higher education sector, institute sector, public sector (hospitals) and
industrial sector.
Identification of the role:
Programme Owner and Manager Y
Programme Owner N
Programme Manager N
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation:
Norwegian participation in European collaboration on research and innovation through Horizon2020
and ERA, is a high priority target for the Norwegian government. The RCN is at present participating in
30 ERA-Net's and all the 10 JPIs.
RCN does not administer a research program which is dedicated specifically to personalised medicine,
but may fund such research projects through different funding activities. The programme for High-
quality and Reliable Diagnostics, Treatment and Rehabilitation (BEHANDLING) will have special
responsibilities concerning follow-up of ERA-PerMed. To promote better, more personalised medicine
is one of the programme's secondary objectives.
Main tasks attributed the proposed action and the previous experience relevant to those tasks:
Based on the previous experience, RCN will actively contribute to the activities related to the joint
calls.
ERA PerMed 92
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Short profile of staff member(s) who will be undertaking the work:
Guro Søe Eriksen, adviser at the Research Council of Norway. Works with the programme for High-
quality and Reliable Diagnostics, Treatment and Rehabilitation (BEHANDLING) and the funding
scheme for Independent basic research projects - Medicine, Health Sciences and Biology
(FRIMEDBIO). Biomedical research background within neurobiology, pharmacology and heart failure
research.
In addition, personnel at RCN involved in other ERA-NETs related to medicine and health may take
part in work connecting to this ERA-NET.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
No maximum amount of financial support is defined under RCNs national funding rules. The amount
we plan to allocate to the co-funded transnational call is 500.000 €. Financial support will be provided
according to the funding rules of RCN, which can be provided by the staff members indicated above
and/or assessed here: https://www.forskningsradet.no/en/Home_page/1177315753906.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 93
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
23 National Centre for Research and Development
Number organisation
Short name NCBR Country Poland
Brief description of the legal entity
The National Centre for Research and Development is the implementing agency of the Minister of
Science and Higher Education. It was appointed in the summer 2007 as an entity in charge of the
performance of the tasks within the area of national science, science and technology and innovation
policies. When it was founded, it was the first entity of this type, created as the platform of an effective
dialogue between the scientific and business communities.
Currently, it operates under the Act on National Centre for Research and Development dated 30 April
2010 (Journal of Laws from 2010, No. 96 item 616). The science reform adopted in the autumn 2010
gave the Centre more freedom to manage its financial assets, within the scope of a strategic research
programme.
In addition, the National Centre for Research and Development extended its activity with new initiatives
and possibilities on 1 September 2011. Assigned by the Ministry of Science and Higher Education the
function of the Mediation Institution in three operational programmes: Human Capital, Innovative
Economy and Infrastructure and Environment, the Centre became one of the greatest innovation centres
in Poland. The activity of the Centre is funded by the national treasury and the European Union.
Identification of the role:
Programme Owner and Manager Y
Programme Owner N
Programme Manager N
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
Main tasks attributed the proposed action and the previous experience relevant to those tasks
Short profile of staff member(s) who will be undertaking the work
Dr Marcin Chmielewski – studied Biology at the University of Warsaw, specialisation - Parasitology.
He got his PhD from the Warsaw Medical University on the thesis “Apoptosis during the course of
infection with hepatitis C virus (HCV) and human immunodeficiency virus (HIV).” Former lecturer at
Warsaw Medical University. Since summer 2011 employed in National Centre for Research and
Development (NCBR) as a Scientific officer. Currently responsible for coordination of national and
international programs in the field of medicine. Main task is to take care of the projects during the
whole funding period. It includes administrative and formal issues, but also scientific reviews.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
Call contribution: 500.000 euro. Financial support will be provided according to the funding rules of
NCBR, which can be provided by the staff members indicated above and/or assessed here:
http://www.ncbr.gov.pl/en.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 94
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Unitatea Executiva pentru Finantarea Invatamantului Superior,
Participant Name of
24 a Cercetarii, Dezvoltarii si Inovarii (Executive Agency for Higher
Number organisation
Education, Research, Development and Innovation Funding)
Short
UEFISCDI Country Romania
name
Brief description of the legal entity
The Executive Agency for Higher Education, Research, Development and Innovation Funding
(UEFISCDI) is a public entity of the Central Administration under the ultimate authority of Ministry of
Education and Research. UEFISCDI reached the current status in July 2010, through GO nr.62/1999,
approved with amendments by Law 74/2010 and GEO nr.150/2000 by merging three organisations with
responsibilities for the management and administration of various programs in the fields of higher
education, research, development and innovation: Executive Agency for Higher Education and Research
Funding (UEFISCSU), National Centre for Programme Management (CNMP), Management Agency for
Research, Innovation and Technology Transfer (AMCSIT).
The Executive Agency for Higher Education, Research, Development and Innovation Funding
(UEFISCDI) is a public entity of the Central Administration under the ultimate authority of Ministry of
Education and Scientific Research (MESR).
UEFISCDI implemented, under the supervision of its advisory councils, four out of the six programs
of the National Plan for Research, Development and Innovation 2007 - 2013 (PN II), i.e.: Human
Resources (exploratory research), Ideas (exploratory research), Partnerships in Priority S&T Areas
(applied research), Innovation (innovation and technology transfer).
Also UEFISCDI implements, under the supervision of its advisory councils, four out of the five
programs of the National Plan for Research, Development and Innovation 2015 - 2020 (PN III),
i.e.: Program 1: Development of the national R&D (1.1. Human Resources (full); 1.3. Infrastructures
R&D (partially); 1.4. Support (partially); Program 2: Increasing the competitiveness of the romanian
economy through research, development and innovation (2.1. Competitivity through research,
development and innovation (partially)); Program 3: European and international cooperation (3.1.
Bilateral / multilateral (excluding the bilateral program with AUF); 3.2. Horizon 2020 (full); 3.5. Other
European and international initiatives and programs (full); 3.6. Support (partially)); Program 4: Basic
research and frontier (full).
Externally, UEFISCDI acts for the promotion of Romanian R&D and its integration in the international
scientific community, by:
Cooperating with similar organizations in Europe and worldwide
Supporting to Romanian R&D actors to develop international partnerships.
UEFISCDI is involved in over 40 international projects, most of them under ERA-NET Scheme FP7/
H2020 and UEFISCDI has strategic partnerships & cooperation agreements with the following
organizations:
European Science Foundation – ESF
Swiss National Science Foundation – SNSF
L'Agence nationale de la recherché – ANR
Deutsche Forschungsgemeinschaft – DFG
National Science Foundation – NSF, USA
Netherlands Organization for Scientific Research.
ERA PerMed 95
Associated with
UEFISCDI is member of different European associations (EARMA, document Ref.
EARTO), Ares(2017)5690678
offers - 21/11/2017
support to SMEs
by EUREKA, EUROSTARS, and administrates the Romanian participation to the Joint Technology
initiatives – JTI/JU (ENIAC, Artemis, Clean Sky, Fuel Cells, IMI).
Website: https://uefiscdi.ro
Identification of the role:
Programme Owner and Manager N
Programme Owner N
Programme Manager Y
In case you are a Programme Manager, please name the respective Programme Owner or public
authority that is providing the mandate for your participation: MCI – Ministry of Research and
Innovation
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
UEFISCDI has the necessary scientific and administrative capabilities to develop and implement
activities in Manunet project within Horizon 2020 by adding valuable inputs to each task and
deliverable. A great part of UEFISCDI activity is based on development of new strategies and
procedures for management and implementation of new R&I oriented programs. Another pillar of our
activity is based on design and monitoring the selection process of R&I funding programs with regards
to end-user implementation of projects, outputs and expected outcomes. Based on this wide experience
we developed an IT platform that includes all stages of program management from publication of the
call to the evaluation, selection, monitoring and follow-up. The program management platform can be
customized for any financial mechanism available and uses cutting-edge hardware in order to facilitate
high user traffic. In the last two years, UEFISCDI evaluated over 4.000 proposals, with 2.500
international evaluators.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
UEFISCDI is a strategic partner in H2020 PROSAFE and also partner and WP/task leader in many FP7
projects among which: ERA.NET RUS Plus- " Further linking Russia to the ERA: Coordination of MS/
AC S&T, programmes towards and with Russia ", COFASP- Cooperation in Fisheries, Aquaculture and
Seafood Processing, FLAG-ERA - FET Flagship ERA-NET, BS-ERA.NET NETWORKING ON
SCIENCE AND TECHNOLOGY IN THE BLACK SEA REGION, ERA.NET-LAC Network of the
European Union, Latin America and the Caribbean Countries on Joint Innovation and Research
Activities, M-ERANET - ERA-NET on research on materials science and engineering, EuroNanoMed -
EUROpean network of transnational collaborative RTD projects in the field of NANOMEDicine and in
many other projects
UEFISCDI participates in WP4 as contributor for Task 4.1, 4.2, 4.3, 4.4.
In WP5 as contributor for Task 5.2.
In WP6 as contributor for Task 6.5
Short profile of staff member(s) who will be undertaking the work
Mrs. Mihaela MANOLE is graduated Financial Management Faculty – Academy of Economic
Studies, Bucharest in 1999, has a master’s in public administration. Mrs. Manole gained expertise in
coordination and implementation of national projects which promoted participation in European and
international research program in the national R&D program: Research for Excellence. She was also
actively involved in ERANET project – EuroNanoMed II, SIINN and ERA.MIN.
Mrs. Nicoleta DUMITRACHE graduated from the Faculty of Letters (2002) and has been involved in
the implementation of several European Projects under FP6 and FP7. In 2005 she joined the National
Centre for Programme Management as a Project Officer for projects in IT. Since 2010 she is a Head of
ERA PerMed 96
Department of management and administration of thematic Associated
researchwith document Ref.-Ares(2017)5690678
programmes Partnerships in- 21/11/2017
S&T
priority domains Programme within UEFISCDI.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
The envisaged amount for call contribution is 500.000 €. Financial support will be provided according
to the funding rules of UEFISCDI, which can be provided by the staff members indicated above and/or
assessed here: https://uefiscdi.ro.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 97
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
25 Ministry of Education, Science and Sport
Number organisation
Short name MIZS Country Slovenia
Brief description of the legal entity
The Ministry of Education, Science and Sport (Ministrstvo za izobrazevanje, znanost in sport - MIZS)
was established in 2013 and is responsible for regulating all levels of education (from pre-school to
higher education), as well as fields of science and sport. MIZS is the legal successor of former Ministry
of Education, Science, Culture and Sport, which in 2012 took over the activities in the field of higher
education and science from the former Ministry of Higher Education, Science and Technology
(MHEST).
The Science division as part of the Science Directorate defines the expert bases for the adoption of
political documents in the field of research policy. It drafts laws and implements regulations on research
activities. It establishes and enhances the system of comprehensive analyses and monitoring of the
developments in research, develops new tools for attaining research policy goals, and plans the required
financial resources for research.
Website: http://www.mizs.gov.si/
Identification of the role:
Programme Owner and Manager Y
Programme Owner N
Programme Manager N
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
The National Research and Innovation Program 2011-2020 as the key strategic and political document
of the Slovenian policy on research and innovation is currently being implemented, in collaboration
with the Ministry of Economic Development and Technology and other relevant stakeholders, who
have contributed to the development of the program.
The financing of research activities is mainly implemented through the Slovenian Research Agency
(ARRS). The main instruments are research programs (long term, 5-year projects), basic and applied
research projects, targeted research programs, the young research program, research infrastructures and
international cooperation.
Specific calls for research projects within ERA-NET projects are published on the relevant web pages
in Slovenian language. Proposals may involve scientific partners from abroad who can dispose of own
budget. Foreign experts are invited in the evaluation procedure of proposals.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
MIZS will offer support within the Work Package on Communication and Dissemination as well as
lead the task of organising the Symposium (WP5).
MIZŠ is the leading government body for the National Contact Points (NCP) network for EU
Framework Programmes on research and innovation, offering advice and raising awareness concerning
cooperation of the research community from Slovenia. Moreover, ministry actively cooperates in the
formation of European Research Area with international coordination of national research programs
through ERA-NET projects, such as WoodWisdom-Net+, ERASynBio, SEE-ERA.NET, M-ERA.NET,
TRANSCAN-1 and 2 etc. It also cooperates in preparation of Joint Transnational Calls within Joint
Program Initiatives (JPIs), such as JPI Climate.
ERA PerMed 98
Associated with
Ministry representatives have substantial experience with preparing anddocument Ref. Ares(2017)5690678
managing various Work - 21/11/2017
Packages, while at the same time can contribute to implementation of numerous tasks within different
projects.
Short profile of staff member(s) who will be undertaking the work
Eva Batista has a Doctoral degree in Ethnology, Social and Cultural Anthropology from the Faculty of
Arts, University of Ljubljana, Slovenia. She is a National Contact Point for SC1 and is responsible for
managing Slovenian participation and involvement in three ERA-NET Co-funds, namely
TRANSCAN-2, ERA-CVD and ERACoSysMed and a CSA, NCPs CaRE. Within these projects, she is
involved in implementation of tasks related to communication, dissemination and networking activities.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
The envisaged amount for call contribution is 210.000 €. Financial support will be provided according
to the funding rules of MIZS, which can be provided by the staff members indicated above and/or
assessed here: http://www.mizs.gov.si.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 99
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
26 Centro para el Desarrollo Tecnológico Industrial
Number organisation
Short name CDTI Country Spain
Brief description of the legal entity
The Centre for the Development of Industrial Technology (CDTI) is a Spanish public organisation under
the Ministry of Economy and Competitiveness whose objective is to help Spanish companies to increase
their technological level. In order to achieve this goal, CDTI develops several activities such as the
funding of RTD projects and supporting Spanish entities in their international technological activities.
CDTI manages the Spanish participation in several international programmes for technological
cooperation (including EUREKA and Eurostars) and have a strategic network of offices and delegates
abroad, (Japan, Belgium, Brazil, Korea, Chile, Morocco, China, India and Mexico) which facilitate the
participation of Spanish companies in technological cooperation projects. CDTI also hosts several
delegates at programme committees and national contact points (NCP) for the HORIZON 2020
Programme of the EU, among others for the area of “Health, Demographic Change and Wellbeing”.
CDTI is also one of the Spanish organisations managing Structural Funds for innovation activities.
Identification of the role:
Programme Owner and Manager Y
Programme Owner -
Programme Manager -
In case you are a Programme Manager, please name the respective Programme Owner or public
authority that is providing the mandate for your participation:
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
Projects coming from the positive evaluation of this ERA NET COFUND will be funded by CDTI under
the National Programme for Research Aimed at the Challenges of HEALTH, DEMOGRAPHIC
CHANGE AND WELFARE.This programme has been designed because the demographic changes
recorded over the past decades, the constant increase in average life expectancy and the legitimate
aspiration to enjoy better quality of life and level of health are factors which condition society’s future
development and wellbeing, among others.
Research involving Health and the National Health System as a framework of fundamental development,
represent a strategic objective for the policies aimed at fostering and coordinating RDI in our country,
which must contemplate fundamental aspects such as (a) research into the most common illnesses; (b)
clinical research of human illnesses; (c) public health and health services; (d) rehabilitation and
development of assisted environments and those designed to address chronic illness; (e) rare illnesses;
(f) the biological bases of the illness and (g) the development of nanomedicine and customised medicine
for which the challenge involves treating the individual and not the illness.
This innovative approach becomes increasingly necessary when the Health Services must maximize the
use of resources to, within a financial sustainability strategy of the system, become capable of
implementing activities aimed at the prevention and early detection of pathological processes which
would in the long term allow for extending the culture of health and, therefore, for a reduction of the
illness’s burden on society as a whole.
In H2020, CDTI is involved in 18 running ERANET COFUND initiatives .
ERA PerMed 100
Main tasks attributed the proposed action and the previousAssociated with document
experience relevantRef. Ares(2017)5690678
to those tasks - 21/11/2017
CDTI will participate in the COFUND call and also in the additional activities to be developed within
this proposal.
Short profile of staff member(s) who will be undertaking the work
Paloma VELASCO GARCIA. Deputy Director for Technical Evaluation. Academic background:
Telecommunication Engineer and Ms in General Management. Since 1991, working at CDTI. Former
Director of Global Innovative Programmes; within FP7, experience as National Contact Point and
Spanish Delegate at the Security Theme Committee as well as Spanish Delegate at the Information and
Communication Technologies Committee of FP7.
Julián DIAZ. Technical Evaluator. Academic background: Industrial Engineer, specialist in Mechanical
Engineering. Since 1995, working at CDTI as a technical evaluator of Projects of Industrial Technologies.
Member of the Cross Cutting Key Enabling Technologies Steering Committee. Regular collaborator as
a Technical Expert Evaluator in many National and International R&D calls.
Do your national funding rules specify a maximum amount of financial N
8
support to a third party?
If yes, please insert the maximum amount [Euro]:
Criteria for determining the exact amount under national funding rules
CDTI only funds RTD projects carried out by companies. The maximum funding rate for financial
support to a third party depends on the size of the companies as follows: 60% for Small companies,
50% for medium companies and 40% for large companies. More information available at
https://www.cdti.es/index.asp?MP=7&MS=724&MN=3
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules9.
€ 700.000 is the call contribution of CDTI, as no other maximum amount of financial support is defined
under national funding rules.
Financial support will be provided according to the funding rules of CDTI, which can be assessed by the
National Contact Point indicated in the call text and/or in the following URL: https://www.cdti.es
Does the participant envisage that part of its work is performed by a N
10
linked third parties .
If yes, describe the third party, the link of the participant to the third party, and describe and justify
the foreseen tasks to be performed by the third party
Does the participant envisage the use of in-kind contribution provided N
by third parties (Articles 11 and 12 of the Model Grant Agreement)
If yes, describe the third party and their contributions
8
This information is required by the financial regulation.
9
This information is required by the financial regulation. If no maximum amount of financial support is defined under national
funding rules please put the amount for call contribution.
10
A third party that is an affiliated entity or has a legal link to a participant implying a collaboration not limited to the action
(Articles 14 of the Model Grant Agreement).
ERA PerMed 101
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
27 Health Department – Generalitat de Catalunya
Number organisation
Short name DS-CAT Country Spain
Brief description of the legal entity
The Health Department of Generalitat de Catalunya (DS-CAT) is the main administrative body of
the Government of Catalonia in decision-making in health. In the fields of health and public health, has
the exclusive power over the organization, internal functioning, evaluation, inspection and control of
centres, services and health establishments, and yet participates in planning and national coordination in
this matter. It also holds the executive power of national legislation on pharmaceutical products and
pharmaceutical regulation.
DS-CAT has the following strategic lines of action:
1. To consolidate an own universal healthcare model based on good governance
2. To promote a sustainable healthcare system based on excellence at the service of general public
and oriented to health outcomes improvement (OMS objectives Horizon 2020)
3. To promote a reference health research and innovation model oriented to solve health problems
4. To enhance evaluation and transparency to improve health system and accountability to citizens
5. To promote proximity and commitment of professionals and citizens
6. To promote an efficient and modern health administration at citizens’ service
The Generalitat de Catalunya, through the Health Department, has launched a new tool for planning and
coordination that defines the general lines of research and innovation in health, the Road Map for
Research and Innovation in Health 2016-2020 (hereinafter, PERIS 2016-2020), aligned with the Horizon
2020 strategy.
The objective of this Plan is to strengthen the leadership of the healthcare system in Catalonia within the
public sector as a whole, ensuring the generation of new knowledge through instrumental actions that are
to be developed through competitive funding. This leadership has to principally result in an improvement
of the health of the general public. Overall, the aim is to encourage strategies for health promotion and
to accelerate the identification and implementation of new solutions to the health problems of society as
a whole.
PERIS 2016-2020 will increase the quality of research conducted in the field of health to ensure the
excellence of our health care system. It will strengthen the capacities of transferring the knowledge
generated by researchers and technologists to care processes in the areas of prevention, diagnosis and
treatment of pathological processes and health promotion
PERIS 2016-2020 will strengthen the capacities and international leadership of health research centres
in Catalonia. At the same time, it will promote the training and employability of scientists and
technologists in the health system of Catalonia and strengthen the scientific capacities of health
professionals.
The first call was launched on October 2016, with a total budget of 20.530M€.
Identification of the role:
Programme Owner and Manager Y
Programme Owner Y
Programme Manager Y
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
Catalonia has achieved a leading position in the area of innovation in Europe through a significant
participation in competitive funding programmes such as Horizon 2020, being a pioneer and benchmark
in innovative projects involving public procurement. The decisive role in Catalonia of the EIT-Health
ERA PerMed 102
initiative (sectoral organisation of the European Institute ofAssociated
Innovationwith document Ref. Ares(2017)5690678
and Technology), - 21/11/2017
the status as a
Reference Site for the EIP on AHA (European Innovation Partnership on Active and Healthy Ageing)
and its prominent participation in projects and programmes undertaken by various Departments of the
European Commission (DG CONNECT, DG SANTE, DG EMPLOYMENT, DG JUSTICE, DG
REGIO) are areas of strategic action that allow the consolidation of Catalonia on the map of health
innovation in Europe and the world.
As a strategic health plan, one of the priorities of the Road Map for Research and Innovation in Health
2016-2020 will be to increase participation in the actions, initiatives and programmes promoted by the
Directorate-General for Health and Food Safety, the Consumers, Health, Agriculture and Food Executive
Agency (Chafea) and other DGs within the European Commission.
DS-CAT has participated/is participating in several FP7 actions, such as LINNEAUS EURO –PC
(Learning from International Networks about Errors and Understanding Safety in Primary Care),
INFRAFRONTIER (Infrafrontier The European infrastructure for phenotyping and archiving of model
mammalian genomes), ALICE RAP (Addictions and Lifestyles In Contemporary Europe – Reframing
Addictions Project), ODHIN (Optimizing delivery of health care interventions), PEGASO (Personalised
Guidance Services for Optimising lifestyle in teen-agers through awareness, motivation and
engagement), RENEWING HEALTH (REgioNs of Europe WorkINg toGether for HEALTH),
AMPHORA (Alcohol Measures for Public Health Research Alliance), and EIT Health under the H2020
programme.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
DS-CAT will be participating in WP6. The aim of this work package is the preparation and
implementation of additional, non-co-funded Joint Transnational Calls (JTC). It is planned to launch at
least two additional calls without EC co-funding in 2019 and 2020.
Description of work:
Task 6.1: Selection of the topic (additional calls). DS-CAT, altogether with ANR and the rest of
partners, partners will choose the appropriate experts, who will meet to refine the call topics.
Task 6.2: Second call JTC 2019, specially in Peer review, project selection and National and
transnational funding decisions
Task 6.3: Third call JTC2020
As it was said before, DS-CAT has recently adopted the Road Map for Research and Innovation in
Health 2016-2020, and launched a competitive funding call which is in the evaluation process.
Short profile of staff member(s) who will be undertaking the work
Antoni Andreu is the Directorate-General for Health Research and Innovation in the Health
Department of the Generalitat de Catalunya. He is MD PhD at the Autonomous University of
Barcelona (UAB), specialist in clinical biochemistry and expert in genetics. His career began as a
physician specialist at the Biochemistry Department at Vall d’Hebron Hospital (HUVH) (1989);
afterwards he moved to Houston Merritt Clinical Research Center at Columbia Presbyterian Medical
Center (New York) (1998) to work in the field of genetic neuromuscular diseases. He has been head of
the Laboratory of Genetics of Neuromuscular Diseases at HUVH (2001), Chief Biochemistry
Department, and Director of Molecular Medicine Porogramme at the same hospital (2011). In 2013 he
was appointed Managing Director at the National Institute of Health Carlos III. Dr Andreu has led
several national and international research projects; has been group coordinator in two national
thematic networks on Rare diseases; director of several doctoral theses and has authored over 150
scientific publications in the area of genetics. He is member of national and International advisory
committees and professor in university programmes on genetics and scientific management at different
universities in Spain.
ERA PerMed 103
Jaume Reventós, MD (1977) at the Autonomous University Associated with document
of Barcelona Ref. Ares(2017)5690678
(UAB), specialized in - 21/11/2017
Clinical Biochemistry (1982), PhD in Cell Biology at INSERM; Lyon (1984). Postdoctoral fellow at
The Rockefeller University, New York (1984-88) and Assistant Professor at Mount Sinai School of
Medicine, New York (1988-90). In 1990 he was appointed Head of the Biomedical Research Unit at
the Vall d’Hebron Research Institute, in Barcelona. From March 2014 to September 2016, he was
General Director of the Institute fo Biomedical Research of Bellvitge (IDIBELL), and since then to
now, Head of Operations and Institutional Relations of the Directorate of Research and Innovation in
the Health Department of the Generalitat de Catalunya. During his scientific career, he has been leading
a research group at the Vall d’Hebron Research Institute for almost 25 years, devoted to the
understanding of the molecular bases of hormome-dependent cancers including prostate, endometrial
and ovarian. He has produced around 160 original scientific manuscripts in important scientific journals
and obtained competitive research funding from national and international research agencies. He has
also been President of the Catalan Society of Biology and been also elected Member of the Institute of
Catalan Studies (National Academy of Sciences).
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
The maximum contribution for the co-funded call will be 500.000€. Financial support will be provided
according to the funding rules of DS-CAT, which can be provided by the staff members indicated
above and/or assessed here: http://web.gencat.cat/es/temes/salut.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 104
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
28 Gobierno de Navarra
Number organisation
Short name GN Country Spain
Brief description of the legal entity
As a public administration institution, the General Directorate of Industry, Energy and Innovation of
the Government of Navarre aims at:
stimulating technological innovation within its local enterprises, through the continuous definition
and implementation of pro-active regional innovation policies.
providing companies with the information they need to define their strategies for innovation.
helping with the training of researchers and technologists.
contributing to the development of an infrastructure of support centres for innovation.
supporting the improvement of SMEs competitiveness by funding activities such as: R&D projects,
work placements for graduates…
The Government of Navarra aims to nurture and put in place the best possible conditions for the region,
in the face of global competition from individuals, business groups, services and regions. The
dedication of financial resources to R+D+i through cooperation and internationalisation is an excellent
investment: Navarre is able to, wants to and needs to do this to position itself as a region that is
balanced, innovative, sustainable and prosperous within the European Research Area (ERA).
Navarra has a long standing tradition in R&D and in Industrialisation Policies, being the 2nd Spanish
region in terms of R&D expenditure as % of GDP and the fifth in terms of industrial activity. Likewise,
Navarra was one of the pioneering regions in Spain in defining Regional Innovation Strategies. The
current RIS3 sets priorities in Bio & Health, Sustainable Vehicles, Environment & Waste, Renewable
Energies, Tourism and Business Support Services sectors, among others.
The General Directorate of Industry, Energy and Innovation is the regional authority for the design and
implementation of the Regional Innovation Strategy.
Identification of the role:
Programme Owner and Manager Y
Programme Owner
Programme Manager
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
H2020-SC1-2016-2017 ERA-NET Cofund on Personalised Medicine ERA PerMed
The aim of the programme is to promote the excellence, to foster the competitiveness of actors in
Personalized Medicine and enhance the European collaboration with countries outside the EU. The main
action is to contribute to strengthen the competiveness of European Personalised Medicine actors taking
into account recent changes in the landscape in Personalised Medicine, including new stakeholders,
emerging technologies and challenges, as identified in the Strategic Research and Innovation Agenda
(SRIA) in Personalised Medicine.
ERA PerMed 105
Associated
The beneficiaries of the programme are transnational research with in
projects document Ref. Ares(2017)5690678
Personalized - 21/11/2017
Medicine. The
funds provided are grants, which combine budget contributions from the participating European and
Associated Member States, the EC and additional research funders.
Bio and Health are key elements of the RIS3 Strategy of Navarre. Thus, as a public body, Government
of Navarre is interested in promoting and funding projects related to Personalised Medicine.
Government of Navarre has participated in several European projects related to the field. To cite few
examples: Lead- ERA and Eurotransbio era nets and ShareBiotech, Alz-e-med or Eiffel projects.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
Government of Navarre has participated in several European projects. To cite few examples: Lead-
ERA and Eurotransbio Era nets and the projects like ShareBiotech, e-medical primary care system for
alzehimer patients (Alz-e-med) or Eiffel.
The main tasks attributed are:
WP2: Preparation and launch of the co-funded call (JTC2018). Tasks involved in the WP.
Short profile of staff member(s) who will be undertaking the work
Silvia Ojer Head of the Promotion of Innovation Section. Since 2009 she has been participating
actively in the different calls of several European projects in the field of technological innovation, both
as technical evaluator and as a member of the Steering Committee, participating in the consortium
meetings.
Aitziber Oscoz Technician of the Promotion of Innovation Section. Since 2006 she has been
participating actively in the management of IT projects of the General Directorate of IT,
Telecomunications and Public Innovation in several domains of public administration.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
GN has committed a preliminary budget of 500.000 € for the cofunded call. Financial support will be
provided according to the funding rules of GN, which can be provided by the staff members indicated
above and/or assessed here: https://www.navarra.es/home_en.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 106
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of
29 Swedish Research Council
Number organisation
Short name SRC Country Sweden
Brief description of the legal entity
In 2001, the Swedish parliament enacted legislation to set up the Research Council “in order to support
basic research of the highest academic quality within all areas of knowledge", hence merging five
councils into one. The Swedish Research Council (SRC) has a leading role in developing Swedish
research of the highest scientific quality, thereby contributing to the development of society. The SRC
is also responsible for coordinating participation and funding of national and international research
infrastructures.
The SRC is working to stimulate Swedish participation in European and international research
cooperation. The aim is a greater exchange of experience and collaboration. The SRC has a specific
responsibility for research cooperation within the EU, as well as a large commitment in Science
Europe.
The Swedish Research Council tasks include also research policy analysis and research policy advice,
as well as communication about research and public understanding of science. The annual budget for
2015 was SEK 6.4 billion.
Identification of the role:
Programme Owner and Manager Y
Programme Owner
Programme Manager
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
SRC, together with the Ministry of Education, has responsibility for programme committee work in
seven areas of the EU's current framework programme mainly within the excellence pillar but also
within the Societal Challenge pillar. SRC is also hosting the National Contact Point within these areas.
SRC is taking part in three joint programming initiatives JPI Climate, JPND and JPIAMR and is the
coordinator of the latter. SRC participates in a number of ERA-Net cofunds such as Gender-net, Quant-
ERA, Flag-ERA.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
Taking part in the first joint co-funded call and possibly in additional joint calls.
SRC is a member of IC PerMed. For additional information see above paragraph.
Short profile of staff member(s) who will be undertaking the work
Dr. Malin Eklund: PhD in Biotechnology from KTH, Stockholm. 10 years of experience as a
researcher in the pharmaceutical industry before joining SRC in 2014. SRC representative in IC
PerMed. Policy officer currently based in Brussels. Previously working at SRC as Senior Research
Officer within the field of medicine and health.
Person X: To be decided (Research officer)
Person Y: To be decided (Research officer/research administrator)
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
The grants distributed by the Swedish Research Council must be administrated by a Swedish
university, higher education institution (HEI) or other public organisation that fulfils the Swedish
Research Councils criteria for an administrating organization. It is up to the administrating organization
to decide which other parties are required to achieve the project goals.
ERA PerMed 107
Financial support will be provided according to the fundingAssociated
rules of with document
Swedish Ref. Ares(2017)5690678
Research - 21/11/2017
Council, which
can be provided by the staff members indicated above and/or assessed here website of the agency:
https://www.vr.se/inenglish/researchfunding/applyforgrants/conditionsforapplicationsandgrants.4.5adac704126af4b4be280007743.html
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 108
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of Netherlands Organisation for Health Research and
30
Number organisation Development
Short name ZonMw Country The Netherlands
Brief description of the legal entity
ZonMw originates from the integration of the Dutch Health Research and Development Council
(ZonMw) with the Council for Medical and Health Research (MW), which was part of The Netherlands
Organisation for Scientific Research (NWO). ZonMw receives its national total budget, about € 70
million per year, mainly from the National Ministry of Health, Welfare and Sport and from NWO.
NWO has commissioned its responsibilities for administrating national research programs in the field
of medical and health research to ZON.
ZonMw has a broad experience in research management, on a national as well as an international level.
It is a member of the European Medical Research Council (EMRC) and has been involved in many
international activities amongst which a number of ERA-nets and JPI’s. Dr. Edvard Beem, co-director
of ZonMw has been a Dutch delegate in the programme committees for Life Sciences since FP5 (noot:
het is niet duidelijk wie straks die EC online zaken gaat tekenen als PLSIGN: Martijntje verwees ons
tot heden naar Edvard…) He has also been involved in the successful application for the European
Developing Countries Clinical Trials (EDCTP) initiative and represents ZonMw in the EMRC and in
various ESFRI projects. Website: http://www.zonmw.nl/en/
Identification of the role:
Programme Owner and Manager N
Programme Owner N
Programme Manager Y
In case you are a Programme Manager, please name the respective Programme Owner
National Ministry of Health, Welfare and Sport (VWS) and The Netherlands Organisation for Scientific
Research (NWO).
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
ZonMw manages national research programmes in the areas of genomics, gene therapy, pharmaceutical
research and development, vaccines and tissue engineering and translational research towards a
personalised medicine. It subsidises a range of projects in the area of health, prevention and care, from
basic scientific research to innovation projects in practice.
The Innovational Research Incentives Scheme of ZonMw offers maximum opportunities for individual
creative research talent. These programmes are accommodated by the team ‘Science and Innovation’ of
ZonMw.
Main tasks attributed the proposed action and the previous experience relevant to those tasks
In this ERA-net Erica Hackenitz will contribute to work packages:
WP3: Evaluation and proposal selection of the co-funded call
WP5: Communication and dissemination of the ERANET PM co-funded projects
WP6: Additional Joint Transnational Calls
WP7: Strategic supporting activities to ensure relevance, impact and sustainability of ERA PerMed
work
Short profile of staff member(s) who will be undertaking the work
Erica Hackenitz obtained an MSc in Biology (environment, tropical health and nutrition) holds a BSc
in social sciences. She was involved in the first breastcancer screening project in the Netherlands
(DOM project), followed by research consulting in various multi-and bilateral projects on
ERA PerMed 109
environmental health and health ecology as coordinator and/or Associated with document
researcher. Ref.programme
She is Ares(2017)5690678 - 21/11/2017
officer at
ZonMw since 2003 and particularly involved in international collaboration. Recently she was executive
officer for CA Eurocan+Plus, ERA-net E-Rare, ERA-net TRANSCAN, ERA-net TRANSCAN2, ERA-
CVD, CSA PerMed and CSA TO-REACH. Amongst others was she was work package leader for the
identification of key players and best practices in the area of personalised medicine and prepared the
SWOT, challenges and hurdles analyses for the Strategic Research and Innovation Agenda for CSA
PerMed.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
Max amount per project in this call: 250k , total amount available for co-founded call: 0,5M
Criteria: eligible according to ZonMw regulations:
https://www.zonmw.nl/fileadmin/documenten/Corporate/Algemene-subsidiebepalingen-
ZonMw_per_1_juli_2013.pdf.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 110
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Participant Name of Scientific and Technological Research Council of
31
Number organisation Turkey
Short name TUBITAK Country TURKEY
Brief description of the legal entity
Founded in 1963, TUBITAK is the leading agency in charge of management, funding and coordinating
scientific and technological research in Turkey. TUBITAK functions under the fold of the Ministry of
Science, Industry and Technology with adequate administrative and financial autonomy. TUBITAK is
also the national coordinating body for the EU Framework Programme Horizon 2020 in Turkey.
TUBITAK’s main tasks are to determine Turkey’s science and technology policies; to support, encourage
and coordinate scientific research; to establish and operate special institutes to conduct research and
development activities geared towards the priorities set by the Science Board. It provides scholarships
and support to researchers and organizing contests to discover and train future scientists; develops support
programs for R&D activities and innovations in public and private sectors; promotes university-industry
collaborations; publishes scientific journals, popular science magazines and books that make science
accessible to the public and supports researchers with awards. TUBITAK is the executing agency in
deployment of international scientific and technological agreements.
Identification of the role:
Programme Owner and Manager Y
Programme Owner N
Programme Manager N
In case you are a Programme Manager, please name the respective Programme Owner
Identify and describe the research programme(s) with which you participate, the main programme
objectives, and any previous experience and participation;
Main tasks attributed the proposed action and the previous experience relevant to those tasks
Short profile of staff member(s) who will be undertaking the work
Mumine Kucukdemir is a Scientific Programmes Expert working for Health Sciences Research Grant
Committee under Academic Research Funding Directorate since 2013. Mrs. Kucukdemir has graduated
from METU Biology Department in 2010 and specialized on Cancer Biology during her Master’s Degree
(Graduation: 2012). Recently, continuing her doctorate research at Hacettepe University Pediatric
Sciences; she is going to undertake the work for the ERA PerMed ERANET Co-fund action on behalf of
TUBITAK.
Please specify the maximum amount of financial support to a third party and the criteria for
determining the exact amount under national funding rules.
TUBITAK envisage to participate in the ERA PerMed Co-fund action with 340.000€. Financial support
will be provided according to the funding rules of GN, which can be provided by the staff members
indicated above and/or assessed here: http://www.tubitak.gov.tr/en.
Does the participant envisage that part of its work is performed by a linked third N
parties.
Does the participant envisage the use of in-kind contribution provided by third N
parties (Articles 11 and 12 of the Model Grant Agreement)
ERA PerMed 111
Section 5: Ethics and security Associated with document Ref. Ares(2017)5690678 - 21/11/2017
5.1 Ethics
ERA PerMed does not implicate performing of research but only funding of research performed by third
parties.
The ERA PerMed consortium confirms that it will establish robust and rigorous procedures for ethics
assessment to ensure that any research activities funded by the consortium are in strict accordance with the
ethics standards and guidelines of H2020, regardless of the country in which they are performed.
Furthermore, the members of the ENM consortium will address the following ethical issues:
- Fairness and transparency in operational procedures, and
- Ethical issues in proposed research projects in joint transnational calls.
In the evaluation of proposed research projects (WP2‐3 and WP6), special attention will be reserved for
potential ethical issues Only projects that fulfil the legal and ethical International/EU and National and
Institutional standards will be funded. In procedural terms, this means that funding for this kind of projects
will be dependent on a positive vote from the responsible ethical and legal committee.
5.2 Security
Please indicate if your project will involve:
activities or results raising security issues: NO
‘EU-classified information’ as background or results: NO
ERA PerMed 112
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
ESTIMATED BUDGET FOR THE ACTION (page 1 of 3 ) Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Estimated eligible1 costs (per budget category) EU contribution Additional information
Maximum Maximum
B. Direct coordination C. Indirect Information Other
A. Costs related to trans-national projects 2 Total costs Reimbursement EU grant
costs of additional activities costs 3 4 for auditors: information:
rate % contribution amount
A.1 Direct
costs of
providing A.2 Direct costs for the implementation of
financial trans-national projects by the beneficiaries
support to
third parties
A.2.2 Direct
A.2.3 Other
A.2.1 Direct personnel costs costs of
direct costs
subcontracting
A.2.3.1
Travel Estimated
A.2.3.2 Declaration
costs of
Equipment of costs
beneficiaries
under Point
not receiving
A.2.1.1. Personnel A.2.3.3 A.23.4
EU funding
A.2.1.2. Natural persons Other
under direct contract goods and
A.2.1.3. Seconded persons services
A.2.3.4.Costs
of large
research
infrastructure
Form of Unit7 Flat-rate8
Actual Actual Unit6 Actual Actual
costs5 29000 EUR/year 25%
b Total c d e
h=
a No units Total g i = a+f+g+h j k l Yes/No
0,25*(f+g)
Total f9
1 . ISCIII 500,000.00 0.00 5.00 145,000.00 36,250.00 681,250.00 33.00 224,812.50 224,812.50 No n/a
2 . FWF 800,000.00 0.00 5.00 145,000.00 36,250.00 981,250.00 33.00 323,812.50 323,812.50 No n/a
3 . CIHR 10 n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 2,800,000.00
4 . FRQS n/a n/a n/a n/a n/a n/a n/a n/a n/a n/a 320,000.00
(Quebec)10
5 . MZOS 120,000.00 0.00 5.00 145,000.00 36,250.00 301,250.00 33.00 99,412.50 99,412.50 No n/a
6. 1,000,000.00 0.00 5.00 145,000.00 36,250.00 1,181,250.00 33.00 389,812.50 389,812.50 No n/a
InnoFond
7 . ETAg 100,000.00 0.00 5.00 145,000.00 36,250.00 281,250.00 33.00 92,812.50 92,812.50 No n/a
8 . MSAE 100,000.00 0.00 5.00 145,000.00 36,250.00 281,250.00 33.00 92,812.50 92,812.50 No n/a
9 . AKA 1,200,000.00 0.00 5.00 145,000.00 36,250.00 1,381,250.00 33.00 455,812.50 455,812.50 No n/a
10 . ANR 2,500,000.00 0.00 5.00 145,000.00 36,250.00 2,681,250.00 33.00 884,812.50 884,812.50 No n/a
1
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
ESTIMATED BUDGET FOR THE ACTION (page 2 of 3 ) Associated with document Ref. Ares(2017)5690678 - 21/11/2017
11 . BMBF 3,000,000.00 0.00 0.00 0.00 0.00 3,000,000.00 33.00 990,000.00 990,000.00 No n/a
12 . DLR 0.00 0.00 5.00 145,000.00 36,250.00 181,250.00 33.00 59,812.50 59,812.50 No n/a
13 . BMG 0.00 0.00 5.00 145,000.00 36,250.00 181,250.00 33.00 59,812.50 59,812.50 No n/a
14 . SMWK 1,500,000.00 0.00 5.00 145,000.00 36,250.00 1,681,250.00 33.00 554,812.50 554,812.50 No n/a
15 . NKFIH 500,000.00 0.00 5.00 145,000.00 36,250.00 681,250.00 33.00 224,812.50 224,812.50 No n/a
16 . HBR 370,000.00 0.00 5.00 145,000.00 36,250.00 551,250.00 33.00 181,912.50 181,912.50 No n/a
17 . CSO- 300,000.00 0.00 5.00 145,000.00 36,250.00 481,250.00 33.00 158,812.50 158,812.50 No n/a
MOH
18 . IT- 1,500,000.00 0.00 5.00 145,000.00 36,250.00 1,681,250.00 33.00 554,812.50 554,812.50 No n/a
MoH
19 . FRRB 4,000,000.00 0.00 5.00 145,000.00 36,250.00 4,181,250.00 33.00 1,379,812.50 1,379,812.50 No n/a
20 . VIAA 300,000.00 0.00 5.00 145,000.00 36,250.00 481,250.00 33.00 158,812.50 158,812.50 No n/a
21 . FNR 300,000.00 0.00 5.00 145,000.00 36,250.00 481,250.00 33.00 158,812.50 158,812.50 No n/a
22 . RCN 500,000.00 0.00 5.00 145,000.00 36,250.00 681,250.00 33.00 224,812.50 224,812.50 No n/a
23 . NCBR 500,000.00 0.00 5.00 145,000.00 36,250.00 681,250.00 33.00 224,812.50 224,812.50 No n/a
24 . 500,000.00 0.00 5.00 145,000.00 36,250.00 681,250.00 33.00 224,812.50 224,812.50 No n/a
UEFISCDI
25 . MIZS 210,000.00 0.00 5.00 145,000.00 36,250.00 391,250.00 33.00 129,112.50 129,112.50 No n/a
26 . CDTI 700,000.00 0.00 5.00 145,000.00 36,250.00 881,250.00 33.00 290,812.50 290,812.50 No n/a
27 . DS- 500,000.00 0.00 5.00 145,000.00 36,250.00 681,250.00 33.00 224,812.50 224,812.50 No n/a
CAT
28 . GN 500,000.00 0.00 5.00 145,000.00 36,250.00 681,250.00 33.00 224,812.50 224,812.50 No n/a
29 . SRC 1,400,000.00 0.00 5.00 145,000.00 36,250.00 1,581,250.00 33.00 521,812.50 521,812.50 No n/a
30 . ZON 500,000.00 0.00 5.00 145,000.00 36,250.00 681,250.00 33.00 224,812.50 224,812.50 No n/a
31 . 340,000.00 0.00 5.00 145,000.00 36,250.00 521,250.00 33.00 172,012.50 172,012.50 No n/a
TUBITAK
Total 23,740,000.00 0.00 140.00 4,060,000.00 1,015,000.00 28,815,000.00 33 9,508,950.00 9,508,950.00 3,120,000.00
Consortium
2
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
ESTIMATED BUDGET FOR THE ACTION (page 3 of 3 ) Associated with document Ref. Ares(2017)5690678 - 21/11/2017
(1) See Article 6 for the eligibility conditions
(2) The indirect costs covered by the operating grant (received under any EU or Euratom funding programme; see Article 6.5.(b)) are ineligible under the GA. Therefore, a beneficiary that receives an operating grant during the
action's duration cannot declare indirect costs for the year(s)/reporting period(s) covered by the operating grant (see Article 6.2.C).
(3) This is the theoretical amount of EU contribution that the system calculates automatically (by multiplying all the budgeted costs by the reimbursement rate). This theoretical amount is capped by the 'maximum grant
amount' (that the Commission/Agency decided to grant for the action) (see Article 5.1).
(4) The 'maximum grant amount' is the maximum grant amount decided by the Commission/Agency. It normally corresponds to the requested grant, but may be lower.
(5) See Article 5 for the forms of costs
(6) Unit : hours worked on the action; costs per unit (hourly rate) : calculated according to beneficiary's usual accounting practice
(7) Unit : years in which additional activities were carried out
(8) Flat rate : 25% of eligible direct costs, from which are excluded: costs of subcontracting for the implementation of trans-national projects by the beneficiaries, costs of in-kind contributions not used on premises and costs of
financial support to third parties implementing trans-national projects (see Article 6.2.C)
(9) For the estimated budget, the beneficiaries must only indicate the global amount for budget category A.2 (i.e. NOT broken down into personnel costs, subcontracting costs and other direct costs). For the financial statements
the costs will have to be broken down.
(10) See Article 9 for beneficiaries not receiving EU funding
(11) Only for linked third parties that receive EU funding
3
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 MGA ERA-NET Cofund — Multi: v3.0
ANNEX 2a
ADDITIONAL INFORMATION ON THE ESTIMATED BUDGET
Instructions and footnotes in blue will not appear in the text generated by the IT system (since
they are internal instructions only).
For options [in square brackets]: the applicable option will be chosen by the IT system. Options
not chosen will automatically not appear.
For fields in [grey in square brackets] (even if they are part of an option as specified in the
previous item): IT system will enter the appropriate data.
ERA-NET unit cost
1. Direct coordination costs for additional activities
Units: number of years in which the additional activities were carried out by each beneficiary/linked third party
Amount per unit (EUR/year): EUR 29 000 per year
Estimated number of units: see Annex 2
1
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
FONDS ZUR FÖRDERUNG DER WISSENSCHAFTLICHEN FORSCHUNG (FWF),
established in SENSENGASSE 1, WIEN 1090, Austria, VAT number: ATU37675903, (‘the
beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘2’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-998735960_75_210--]
1
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
CANADIAN INSTITUTES OF HEALTH RESEARCH (CIHR), established in ELGIN STREET
9TH FLOOR ADDRESS LOCATOR 4809A 160, OTTAWA ONTARIO K1T 4H8, Canada, (‘the
beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘3’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-960368386_75_210--]
2
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
FONDS DE RECHERCHE DU QUEBEC - SANTE (FRQS (Quebec)), established in RUE
SHERBROOKE OUEST 500, MONTREAL QUEBEC H3A3C6, Canada, (‘the beneficiary’),
represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘4’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-963122410_75_210--]
3
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTARSTVO ZNANOSTI I OBRAZOVANJA (MZOS), established in Donje Svetice 38,
ZAGREB 10000, Croatia, (‘the beneficiary’), represented for the purpose of signing this Accession
Form by the undersigned,
hereby agrees
to become beneficiary No (‘5’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999825949_75_210--]
4
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
INNOVATIONSFONDEN (InnoFond), established in OSTERGADE 26 A, KOBENHAVN K
1100, Denmark, VAT number: DK29035695, (‘the beneficiary’), represented for the purpose of
signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘6’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-939076692_75_210--]
5
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SIHTASUTUS EESTI TEADUSAGENTUUR (ETAg), established in SOOLA 8, TARTU 51013,
Estonia, (‘the beneficiary’), represented for the purpose of signing this Accession Form by the
undersigned,
hereby agrees
to become beneficiary No (‘7’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-998483760_75_210--]
6
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SOTSIAALMINISTEERIUM (MSAE), established in Suur-Ameerika 1, TALLINN 10122,
Estonia, (‘the beneficiary’), represented for the purpose of signing this Accession Form by the
undersigned,
hereby agrees
to become beneficiary No (‘8’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-998429731_75_210--]
7
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SUOMEN AKATEMIA (AKA), established in HAKANIEMENRANTA 6, HELSINKI 00531,
Finland, VAT number: FI02458939, (‘the beneficiary’), represented for the purpose of signing this
Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘9’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999517586_75_210--]
8
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
AGENCE NATIONALE DE LA RECHERCHE (ANR), established in 50 avenue Daumesnil,
PARIS 75012, France, (‘the beneficiary’), represented for the purpose of signing this Accession Form
by the undersigned,
hereby agrees
to become beneficiary No (‘10’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-998711613_75_210--]
9
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
BUNDESMINISTERIUM FUER BILDUNG UND FORSCHUNG (BMBF), established in
Heinemannstrasse 2, BONN 53175, Germany, (‘the beneficiary’), represented for the purpose of
signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘11’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999835455_75_210--]
10
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
DEUTSCHES ZENTRUM FUER LUFT - UND RAUMFAHRT EV (DLR), established in Linder
Hoehe, KOELN 51147, Germany, (‘the beneficiary’), represented for the purpose of signing this
Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘12’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999981731_75_210--]
Silke KRAUS with ECAS id nkraussk signed in the
Participant Portal on 06/12/2017 at 18:03:20 (transaction id
SigId-69375-
cqGFEjsQxT7gB2FzyH73sR6sIxdwiAaZTZxtqKE9FUozip9
nFFwysQ9aOdUPzqD6AS1L6LbfeofG63nOGk86XCW-
Jj71zxYb8yrNhG1ZJUpYxu-
NdNUeGT0GJVDuJmQPPlsZ6hIxBjia8hpxkRaGCaUwUe).
Timestamp by third party at
Wed Dec 06 18:03:34 CET 2017
11
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
BUNDESMINISTERIUM FUER GESUNDHEIT (BMG), established in ROCHUSTRASSE 1,
BONN 53123, Germany, (‘the beneficiary’), represented for the purpose of signing this Accession
Form by the undersigned,
hereby agrees
to become beneficiary No (‘13’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-998954889_75_210--]
12
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
SACHSISCHES STAATSMINISTERIUM FUR WISSENSCHAFT UND KUNST (SMWK),
established in WIGARDSTRASSE 17, Dresden 01097, Germany, (‘the beneficiary’), represented for
the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘14’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-998235634_75_210--]
13
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
NEMZETI KUTATASI FEJLESZTESI ES INNOVACIOS HIVATAL (NKFIH), established
in KETHLY ANNA TER 1, BUDAPEST 1077, Hungary, VAT number: HU15831000, (‘the
beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘15’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999578696_75_210--]
József PÁLINKÁS with ECAS id npalijoz signed in the
Participant Portal on 06/12/2017 at 13:53:57 (transaction id
SigId-60028-
H0Lx1FB4BRCRDSAZDzqrXatzbfWTBKb3g44ybayrVEfA4
m2IzgkBAt6wf6oziK7GoPuI06e5D6q7ShJ6hIF6gzw-
Jj71zxYb8yrNhG1ZJUpYxu-
6iIIUB1aM1eib6uGBzvlvBzWKTNtxaS2AEhb2tzqtIVe).
Timestamp by third party at
Wed Dec 06 13:54:08 CET 2017
14
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
THE HEALTH RESEARCH BOARD (HBR), established in LOWER BAGGOT STREET 73,
DUBLIN 2, Ireland, VAT number: IE4820764P, (‘the beneficiary’), represented for the purpose of
signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘16’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999546686_75_210--]
Mairead O'DRISCOLL with ECAS id ndrismai signed in the
Participant Portal on 05/12/2017 at 17:42:43 (transaction id
SigId-44804-
7DB9wq25sRnQI4ZJ2gLfSCqO6xzPnF7VCzVAilzPDzk6Af
TLXpBpuMk5HpD2zkx4YlH37R6zapd9ItNhJh5R0FxG-
Jj71zxYb8yrNhG1ZJUpYxu-
swYkbkLNSJoHHTSgtoGbl8zLPPWFdXBuozjsi5WwTbAm
). Timestamp by third party at
Tue Dec 05 17:42:54 CET 2017
15
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTRY OF HEALTH (CSO-MOH), established in YIRMIYAHU 39, JERUSALEM 9101002,
Israel, (‘the beneficiary’), represented for the purpose of signing this Accession Form by the
undersigned,
hereby agrees
to become beneficiary No (‘17’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999596156_75_210--]
16
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
MINISTERO DELLA SALUTE (IT-MoH), established in Via Giorgio Ribotta 5, ROMA 00144,
Italy, VAT number: N/A, (‘the beneficiary’), represented for the purpose of signing this Accession
Form by the undersigned,
hereby agrees
to become beneficiary No (‘18’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999531942_75_210--]
17
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
FONDAZIONE REGIONALE PER LA RICERCA BIOMEDICA (FRRB), established in
PIAZZA CITTA DI LOMBARDIA 1, MILANO 20124, Italy, VAT number: IT97608860157, (‘the
beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘19’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-929009450_75_210--]
18
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
VALSTS IZGLITIBAS ATTISTIBAS AGENTURA (VIAA), established in VALNU IELA 1,
RIGA 1050, Latvia, (‘the beneficiary’), represented for the purpose of signing this Accession Form
by the undersigned,
hereby agrees
to become beneficiary No (‘20’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-948820730_75_210--]
Elita ZONDAKA with ECAS id nzondael signed in the
Participant Portal on 06/12/2017 at 17:44:20 (transaction id
SigId-68870-
VkAARY0xlAFzuuT4oFwGXWPimAgqIv6IV4Hk1F2UQj7K
ZsyiOi7G1TyRTD1zghuTzMsYCTg0bpOkkG8vAVN3Br0-
Jj71zxYb8yrNhG1ZJUpYxu-
dgmGzUJ63ypwMHze3rIrdaM7xReXncsV1c9mg3MrkAd0)
. Timestamp by third party at
Wed Dec 06 17:44:29 CET 2017
19
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
FONDS NATIONAL DE LA RECHERCHE (FNR), established in 2 AVENUE DE
L'UNIVERSITE, ESCH-SUR-ALZETTE 4365, Luxembourg, VAT number: LU20686731, (‘the
beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘21’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-998597153_75_210--]
20
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
NORGES FORSKNINGSRAD (RCN), established in DRAMMENSVEIEN 288, OSLO 0283,
Norway, VAT number: NO970141669MVA, (‘the beneficiary’), represented for the purpose of
signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘22’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999460453_75_210--]
21
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
NARODOWE CENTRUM BADAN I ROZWOJU (NCBR), established in UL.
NOWOGRODZKA 47A, WARSZAWA 00 695, Poland, VAT number: PL7010073777, (‘the
beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘23’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999519720_75_210--]
22
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
Unitatea Executiva pentru Finantarea Invatamantului Superior, a Cercetarii, Dezvoltarii si
Inovarii (UEFISCDI), established in Mendeleev Street 21-25, Bucharest 010362, Romania, (‘the
beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘24’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-972130024_75_210--]
23
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
Ministrstvo za izobrazevanje, znanost in sport (MIZS), established in Masarykova 16, Ljubljana
1000, Slovenia, VAT number: SI14246821, (‘the beneficiary’), represented for the purpose of signing
this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘25’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-953355965_75_210--]
24
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
CENTRO PARA EL DESARROLLO TECNOLOGICO INDUSTRIAL. (CDTI), established in
CALLE CID 4, MADRID 28001, Spain, (‘the beneficiary’), represented for the purpose of signing
this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘26’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999510020_75_210--]
25
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
DEPARTAMENT DE SALUT - GENERALITAT DE CATALUNYA (DS-CAT), established in
Trav. de les Corts (Pavelló Ave Maria) 131-159, BARCELONA 08028, Spain, (‘the beneficiary’),
represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘27’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999826919_75_210--]
26
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
COMUNIDAD FORAL DE NAVARRA - GOBIERNO DE NAVARRA (GN), established
in AVENIDA CARLOS III 2, PAMPLONA 31002, Spain, VAT number: ESS3100000C, (‘the
beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘28’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-990380089_75_210--]
27
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
VETENSKAPSRADET - SWEDISH RESEARCH COUNCIL (SRC), established in VASTRA
JARNVAGSGATAN 3, STOCKHOLM 111 64, Sweden, VAT number: SE202100520801, (‘the
beneficiary’), represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘29’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999586165_75_210--]
28
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
ZORGONDERZOEK NEDERLAND ZON (ZON), established in Laan Van Nieuw Oost Indie 334,
DEN HAAG 2593CE, Netherlands, (‘the beneficiary’), represented for the purpose of signing this
Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘30’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999544164_75_210--]
29
Grant Agreement number: 779282 — ERA PerMed — H2020-SC1-2016-2017/H2020-SC1-2017-Single-Stage-RTD
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
ANNEX 3
ACCESSION FORM FOR BENEFICIARIES
TURKIYE BILIMSEL VE TEKNOLOJIK ARASTIRMA KURUMU (TUBITAK), established
in Ataturk Bulvari 221, ANKARA 06100, Turkey, VAT number: TR1750003600, (‘the beneficiary’),
represented for the purpose of signing this Accession Form by the undersigned,
hereby agrees
to become beneficiary No (‘31’)
in Grant Agreement No 779282 (‘the Agreement’)
between INSTITUTO DE SALUD CARLOS III and the European Union (‘the EU’), represented by
the European Commission ('the Commission'),
for the action entitled ‘ERA-Net Cofund in Personalised Medicine (ERA PerMed)’.
and mandates
the coordinator to submit and sign in its name and on its behalf any amendments to the Agreement,
in accordance with Article 55.
By signing this Accession Form, the beneficiary accepts the grant and agrees to implement it in
accordance with the Agreement, with all the obligations and conditions it sets out.
SIGNATURE
For the beneficiary
[--TGSMark#signature-999587135_75_210--]
30
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
i print format A4 MODEL ANNEX 4 FOR H2020 MGA ERA-NET COFUND — MULTI
FINANCIAL STATEMENT FOR [BENEFICIARY [name]/LINKED THIRD PARTY [name]] FOR REPORTING PERIOD [reporting period]
1 Additional
Eligible costs (per budget category) Receipts EU contribution
information
B. Direct coordination costs of additional C. Indirect Reimburseme Maximum EU Requested EU Information for
A. Costs related to trans-national projects 2 Total costs Receipts 3
activities costs nt rate % contribution contribution indirect costs :
A.1 Direct costs Receipts of the Costs of in-kind
of providing action, to be contributions
A.2 Direct costs for the implementation of trans-national projects by the reported in the last not used on
financial
beneficiaries reporting period, premises
support to
according to
third parties
Article 5.3.3
A.2.2 Direct
A.2.1 Direct personnel costs costs of A.2.3 Other direct costs
subcontracting
A.2.1.1. Employees (or A.2.3.1 Travel [A.2.3.4.Costs of
equivalent) large research
A.2.1.2. Natural persons under A.2.3.2 Equipment infrastructure]
direct contract
A.2.1.3. Seconded persons A.2.3.3 Other goods
and services
Unit 5
4 Flat-rate
Form of costs Actual Actual Unit Actual Actual
29000 EUR/year 25%
h=
i = a+b+c+d+e+[f ]+ g
a b Total c d e [f] No units Total g 0,25x(b+c +e+[f] + j k l m n
+h
g -n)
[short name
beneficiary/linked third
party]
The beneficiary/linked third party hereby confirms that:
The information provided is complete, reliable and true.
The costs declared are eligible (see Article 6).
The costs can be substantiated by adequate records and supporting documentation that will be produced upon request or in the context of checks, reviews, audits and investigations (see Articles 17, 18 and 22).
For the last reporting period: that all the receipts have been declared (see Article 5.3.3).
i Please declare all eligible costs, even if they exceed the amounts indicated in the estimated budget (see Annex 2). Only amounts that were declared in your individual financial statements can be taken into account lateron, in order to replace other costs that are found to be ineligible.
1
See Article 6 for the eligibility conditions
2
The indirect costs claimed must be free of any amounts covered by an operating grant (received under any EU or Euratom funding programme; see Article 6.2.C). If you have received an operating grant during this reporting period, you cannot claim any indirect costs.
3
This is the theoretical amount of EU contribution that the system calculates automatically (by multiplying the reimbursement rate by the total costs declared). The amount you request (in the column 'requested EU contribution') may be less.
4
See Article 5 for the forms of costs
5
Flat rate : 25% of eligible direct costs, from which are excluded: direct costs of subcontracting, for the implementation of trans-national projects by the beneficiaries, costs of in-kind contributions not used on premises and direct costs of financial support to third parties implementing trans-
national projects (see Article 6.2.C)
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements: H2020 General MGA — Multi: v3.0 – dd.mm.2016
ANNEX 5
MODEL FOR THE CERTIFICATE ON THE FINANCIAL STATEMENTS
For options [in italics in square brackets]: choose the applicable option. Options not chosen should
be deleted.
For fields in [grey in square brackets]: enter the appropriate data
TABLE OF CONTENTS
TERMS OF REFERENCE FOR AN INDEPENDENT REPORT OF FACTUAL FINDINGS ON COSTS
DECLARED UNDER A GRANT AGREEMENT FINANCED UNDER THE HORIZON 2020 RESEARCH
FRAMEWORK PROGRAMME
INDEPENDENT REPORT OF FACTUAL FINDINGS ON COSTS DECLARED UNDER A GRANT
AGREEMENT FINANCED UNDER THE HORIZON 2020 RESEARCH FRAMEWORK PROGRAMME
1
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements: H2020 General MGA — Multi: v3.0 – dd.mm.2016
Terms of Reference for an Independent Report of Factual Findings on costs declared
under a Grant Agreement financed under the Horizon 2020 Research and Innovation
Framework Programme
This document sets out the ‘Terms of Reference (ToR)’ under which
[OPTION 1: [insert name of the beneficiary] (‘the Beneficiary’)] [OPTION 2: [insert name of the
linked third party] (‘the Linked Third Party’), third party linked to the Beneficiary [insert name of the
beneficiary] (‘the Beneficiary’)]
agrees to engage
[insert legal name of the auditor] (‘the Auditor’)
to produce an independent report of factual findings (‘the Report’) concerning the Financial
Statement(s)1 drawn up by the [Beneficiary] [Linked Third Party] for the Horizon 2020 grant
agreement [insert number of the grant agreement, title of the action, acronym and duration from/to]
(‘the Agreement’), and
to issue a Certificate on the Financial Statements’ (‘CFS’) referred to in Article 20.4 of the Agreement
based on the compulsory reporting template stipulated by the Commission.
The Agreement has been concluded under the Horizon 2020 Research and Innovation Framework
Programme (H2020) between the Beneficiary and [OPTION 1: the European Union, represented by
the European Commission (‘the Commission’)][ OPTION 2: the European Atomic Energy Community
(Euratom,) represented by the European Commission (‘the Commission’)][OPTION 3: the [Research
Executive Agency (REA)] [European Research Council Executive Agency (ERCEA)] [Innovation and
Networks Executive Agency (INEA)] [Executive Agency for Small and Medium-sized Enterprises
(EASME)] (‘the Agency’), under the powers delegated by the European Commission (‘the
Commission’).]
The [Commission] [Agency] is mentioned as a signatory of the Agreement with the Beneficiary only.
The [European Union][Euratom][Agency] is not a party to this engagement.
1.1 Subject of the engagement
The coordinator must submit to the [Commission][Agency] the final report within 60 days following
the end of the last reporting period which should include, amongst other documents, a CFS for each
beneficiary and for each linked third party that requests a total contribution of EUR 325 000 or more,
as reimbursement of actual costs and unit costs calculated on the basis of its usual cost accounting
practices (see Article 20.4 of the Agreement). The CFS must cover all reporting periods of the
beneficiary or linked third party indicated above.
The Beneficiary must submit to the coordinator the CFS for itself and for its linked third party(ies), if
the CFS must be included in the final report according to Article 20.4 of the Agreement..
The CFS is composed of two separate documents:
- The Terms of Reference (‘the ToR’) to be signed by the [Beneficiary] [Linked Third Party]
and the Auditor;
1
By which costs under the Agreement are declared (see template ‘Model Financial Statements’ in Annex 4 to
the Grant Agreement).
2
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements: H2020 General MGA — Multi: v3.0 – dd.mm.2016
- The Auditor’s Independent Report of Factual Findings (‘the Report’) to be issued on the
Auditor’s letterhead, dated, stamped and signed by the Auditor (or the competent public
officer) which includes the agreed-upon procedures (‘the Procedures’) to be performed by the
Auditor, and the standard factual findings (‘the Findings’) to be confirmed by the Auditor.
If the CFS must be included in the final report according to Article 20.4 of the Agreement, the request
for payment of the balance relating to the Agreement cannot be made without the CFS. However, the
payment for reimbursement of costs covered by the CFS does not preclude the [Commission,][
Agency,] the European Anti-Fraud Office and the European Court of Auditors from carrying out
checks, reviews, audits and investigations in accordance with Article 22 of the Agreement.
1.2 Responsibilities
The [Beneficiary] [Linked Third Party]:
must draw up the Financial Statement(s) for the action financed by the Agreement in
compliance with the obligations under the Agreement. The Financial Statement(s) must be
drawn up according to the [Beneficiary’s] [Linked Third Party’s] accounting and book-
keeping system and the underlying accounts and records;
must send the Financial Statement(s) to the Auditor;
is responsible and liable for the accuracy of the Financial Statement(s);
is responsible for the completeness and accuracy of the information provided to enable the
Auditor to carry out the Procedures. It must provide the Auditor with a written representation
letter supporting these statements. The written representation letter must state the period
covered by the statements and must be dated;
accepts that the Auditor cannot carry out the Procedures unless it is given full access to the
[Beneficiary’s] [Linked Third Party’s] staff and accounting as well as any other relevant
records and documentation.
The Auditor:
[Option 1 by default: is qualified to carry out statutory audits of accounting documents in
accordance with Directive 2006/43/EC of the European Parliament and of the Council of 17
May 2006 on statutory audits of annual accounts and consolidated accounts, amending
Council Directives 78/660/EEC and 83/349/EEC and repealing Council Directive 84/253/EEC
or similar national regulations].
[Option 2 if the Beneficiary or Linked Third Party has an independent Public Officer: is a
competent and independent Public Officer for which the relevant national authorities have
established the legal capacity to audit the Beneficiary].
[Option 3 if the Beneficiary or Linked Third Party is an international organisation: is an
[internal] [external] auditor in accordance with the internal financial regulations and
procedures of the international organisation].
The Auditor:
must be independent from the Beneficiary [and the Linked Third Party], in particular, it must
not have been involved in preparing the [Beneficiary’s] [Linked Third Party’s] Financial
Statement(s);
must plan work so that the Procedures may be carried out and the Findings may be assessed;
must adhere to the Procedures laid down and the compulsory report format;
must carry out the engagement in accordance with this ToR;
must document matters which are important to support the Report;
must base its Report on the evidence gathered;
must submit the Report to the [Beneficiary] [Linked Third Party].
3
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements: H2020 General MGA — Multi: v3.0 – dd.mm.2016
The Commission sets out the Procedures to be carried out by the Auditor. The Auditor is not
responsible for their suitability or pertinence. As this engagement is not an assurance engagement, the
Auditor does not provide an audit opinion or a statement of assurance.
1.3 Applicable Standards
2
The Auditor must comply with these Terms of Reference and with :
- the International Standard on Related Services (‘ISRS’) 4400 Engagements to perform
Agreed-upon Procedures regarding Financial Information as issued by the International
Auditing and Assurance Standards Board (IAASB);
- the Code of Ethics for Professional Accountants issued by the International Ethics
Standards Board for Accountants (IESBA). Although ISRS 4400 states that independence
is not a requirement for engagements to carry out agreed-upon procedures, the
[Commission][Agency] requires that the Auditor also complies with the Code’s
independence requirements.
The Auditor’s Report must state that there is no conflict of interests in establishing this Report
between the Auditor and the Beneficiary [and the Linked Third Party], and must specify - if the
service is invoiced - the total fee paid to the Auditor for providing the Report.
1.4 Reporting
The Report must be written in the language of the Agreement (see Article 20.7).
Under Article 22 of the Agreement, the Commission[, the Agency], the European Anti-Fraud Office
and the Court of Auditors have the right to audit any work that is carried out under the action and for
which costs are declared from [the European Union] [Euratom] budget. This includes work related to
this engagement. The Auditor must provide access to all working papers (e.g. recalculation of hourly
rates, verification of the time declared for the action) related to this assignment if the Commission [,
the Agency], the European Anti-Fraud Office or the European Court of Auditors requests them.
1.5 Timing
The Report must be provided by [dd Month yyyy].
1.6 Other terms
[The [Beneficiary] [Linked Third Party] and the Auditor can use this section to agree other specific
terms, such as the Auditor’s fees, liability, applicable law, etc. Those specific terms must not
contradict the terms specified above.]
[legal name of the Auditor] [legal name of the [Beneficiary][Linked Third Party]]
[name & function of authorised representative] [name & function of authorised representative]
[dd Month yyyy] [dd Month yyyy]
Signature of the Auditor Signature of the [Beneficiary][Linked Third Party]
2
Supreme Audit Institutions applying INTOSAI-standards may carry out the Procedures according to the
corresponding International Standards of Supreme Audit Institutions and code of ethics issued by INTOSAI
instead of the International Standard on Related Services (‘ISRS’) 4400 and the Code of Ethics for
Professional Accountants issued by the IAASB and the IESBA.
4
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements: H2020 General MGA — Multi: v3.0 – dd.mm.2016
Independent Report of Factual Findings on costs declared
under Horizon 2020 Research and Innovation Framework Programme
(To be printed on the Auditor’s letterhead)
To
[ name of contact person(s)], [Position]
[ [Beneficiary’s] [Linked Third Party’s] name ]
[ Address]
[ dd Month yyyy]
Dear [Name of contact person(s)],
As agreed under the terms of reference dated [dd Month yyyy]
with [OPTION 1: [insert name of the beneficiary] (‘the Beneficiary’)] [OPTION 2: [insert name of
the linked third party] (‘the Linked Third Party’), third party linked to the Beneficiary [insert name of
the beneficiary] (‘the Beneficiary’)],
we
[name of the auditor ] (‘the Auditor’),
established at
[full address/city/state/province/country],
represented by
[name and function of an authorised representative],
have carried out the procedures agreed with you regarding the costs declared in the Financial
Statement(s)3 of the [Beneficiary] [Linked Third Party] concerning the grant agreement
[insert grant agreement reference: number, title of the action and acronym] (‘the Agreement’),
with a total cost declared of
[total amount] EUR,
and a total of actual costs and ‘direct personnel costs declared as unit costs calculated in accordance
with the [Beneficiary’s] [Linked Third Party’s] usual cost accounting practices’ declared of
[sum of total actual costs and total direct personnel costs declared as unit costs calculated in
accordance with the [Beneficiary’s] [Linked Third Party’s] usual cost accounting practices] EUR
and hereby provide our Independent Report of Factual Findings (‘the Report’) using the
compulsory report format agreed with you.
The Report
Our engagement was carried out in accordance with the terms of reference (‘the ToR’) appended to
this Report. The Report includes the agreed-upon procedures (‘the Procedures’) carried out and the
standard factual findings (‘the Findings’) examined.
3
By which the Beneficiary declares costs under the Agreement (see template ‘Model Financial Statement’ in
Annex 4 to the Agreement).
5
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements: H2020 General MGA — Multi: v3.0 – dd.mm.2016
The Procedures were carried out solely to assist the [Commission] [Agency] in evaluating whether the
[Beneficiary’s] [Linked Third Party’s] costs in the accompanying Financial Statement(s) were
declared in accordance with the Agreement. The [Commission] [Agency] draws its own conclusions
from the Report and any additional information it may require.
The scope of the Procedures was defined by the Commission. Therefore, the Auditor is not responsible
for their suitability or pertinence. Since the Procedures carried out constitute neither an audit nor a
review made in accordance with International Standards on Auditing or International Standards on
Review Engagements, the Auditor does not give a statement of assurance on the Financial Statements.
Had the Auditor carried out additional procedures or an audit of the [Beneficiary’s] [Linked Third
Party’s] Financial Statements in accordance with International Standards on Auditing or International
Standards on Review Engagements, other matters might have come to its attention and would have
been included in the Report.
Not applicable Findings
We examined the Financial Statement(s) stated above and considered the following Findings not
applicable:
Explanation (to be removed from the Report):
If a Finding was not applicable, it must be marked as ‘N.A.’ (‘Not applicable’) in the corresponding row on the
right-hand column of the table and means that the Finding did not have to be corroborated by the Auditor and
the related Procedure(s) did not have to be carried out.
The reasons of the non-application of a certain Finding must be obvious i.e.
i) if no cost was declared under a certain category then the related Finding(s) and Procedure(s) are
not applicable;
ii) if the condition set to apply certain Procedure(s) are not met the related Finding(s) and those
Procedure(s) are not applicable. For instance, for ‘beneficiaries with accounts established in a
currency other than euro’ the Procedure and Finding related to ‘beneficiaries with accounts
established in euro’ are not applicable. Similarly, if no additional remuneration is paid, the related
Finding(s) and Procedure(s) for additional remuneration are not applicable.
List here all Findings considered not applicable for the present engagement and explain the
reasons of the non-applicability.
….
Exceptions
Apart from the exceptions listed below, the [Beneficiary] [Linked Third Party] provided the Auditor
all the documentation and accounting information needed by the Auditor to carry out the requested
Procedures and evaluate the Findings.
Explanation (to be removed from the Report):
- If the Auditor was not able to successfully complete a procedure requested, it must be marked as ‘E’
(‘Exception’) in the corresponding row on the right-hand column of the table. The reason such as the
inability to reconcile key information or the unavailability of data that prevents the Auditor from
carrying out the Procedure must be indicated below.
- If the Auditor cannot corroborate a standard finding after having carried out the corresponding
procedure, it must also be marked as ‘E’ (‘Exception’) and, where possible, the reasons why the
Finding was not fulfilled and its possible impact must be explained here below.
List here any exceptions and add any information on the cause and possible consequences of
each exception, if known. If the exception is quantifiable, include the corresponding amount.
….
6
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements: H2020 General MGA — Multi: v3.0 – dd.mm.2016
Example (to be removed from the Report):
1. The Beneficiary was unable to substantiate the Finding number 1 on … because ….
2. Finding number 30 was not fulfilled because the methodology used by the Beneficiary to
calculate unit costs was different from the one approved by the Commission. The differences
were as follows: …
3. After carrying out the agreed procedures to confirm the Finding number 31, the Auditor found a
difference of _____________ EUR. The difference can be explained by …
Further Remarks
In addition to reporting on the results of the specific procedures carried out, the Auditor would like to
make the following general remarks:
Example (to be removed from the Report):
1. Regarding Finding number 8 the conditions for additional remuneration were considered as
fulfilled because …
2. In order to be able to confirm the Finding number 15 we carried out the following additional
procedures: ….
Use of this Report
This Report may be used only for the purpose described in the above objective. It was prepared solely
for the confidential use of the [Beneficiary] [Linked Third Party] and the [Commission] [Agency], and
only to be submitted to the [Commission] [Agency] in connection with the requirements set out in
Article 20.4 of the Agreement. The Report may not be used by the [Beneficiary] [Linked Third Party]
or by the [Commission] [Agency] for any other purpose, nor may it be distributed to any other parties.
The [Commission] [Agency] may only disclose the Report to authorised parties, in particular to the
European Anti-Fraud Office (OLAF) and the European Court of Auditors.
This Report relates only to the Financial Statement(s) submitted to the [Commission] [Agency] by the
[Beneficiary] [Linked Third Party] for the Agreement. Therefore, it does not extend to any other of
the [Beneficiary’s] [Linked Third Party’s] Financial Statement(s).
There was no conflict of interest4 between the Auditor and the Beneficiary [and Linked Third Party]
in establishing this Report. The total fee paid to the Auditor for providing the Report was EUR ______
(including EUR______ of deductible VAT).
We look forward to discussing our Report with you and would be pleased to provide any further
information or assistance.
[legal name of the Auditor]
[name and function of an authorised representative]
[dd Month yyyy]
Signature of the Auditor
4
A conflict of interest arises when the Auditor's objectivity to establish the certificate is compromised in fact
or in appearance when the Auditor for instance:
- was involved in the preparation of the Financial Statements;
- stands to benefit directly should the certificate be accepted;
- has a close relationship with any person representing the beneficiary;
- is a director, trustee or partner of the beneficiary; or
- is in any other situation that compromises his or her independence or ability to establish the certificate
impartially.
7
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Agreed-upon procedures to be performed and standard factual findings to be confirmed by the Auditor
The European Commission reserves the right to i) provide the auditor with additional guidance regarding the procedures to be followed or the facts to be
ascertained and the way in which to present them (this may include sample coverage and findings) or to ii) change the procedures, by notifying the
Beneficiary in writing. The procedures carried out by the auditor to confirm the standard factual finding are listed in the table below.
If this certificate relates to a Linked Third Party, any reference here below to ‘the Beneficiary’ is to be considered as a reference to ‘the Linked Third Party’.
The ‘result’ column has three different options: ‘C’, ‘E’ and ‘N.A.’:
‘C’ stands for ‘confirmed’ and means that the auditor can confirm the ‘standard factual finding’ and, therefore, there is no exception to be reported.
‘E’ stands for ‘exception’ and means that the Auditor carried out the procedures but cannot confirm the ‘standard factual finding’, or that the Auditor
was not able to carry out a specific procedure (e.g. because it was impossible to reconcile key information or data were unavailable),
‘N.A.’ stands for ‘not applicable’ and means that the Finding did not have to be examined by the Auditor and the related Procedure(s) did not have
to be carried out. The reasons of the non-application of a certain Finding must be obvious i.e. i) if no cost was declared under a certain category then
the related Finding(s) and Procedure(s) are not applicable; ii) if the condition set to apply certain Procedure(s) are not met then the related Finding(s)
and Procedure(s) are not applicable. For instance, for ‘beneficiaries with accounts established in a currency other than the euro’ the Procedure related
to ‘beneficiaries with accounts established in euro’ is not applicable. Similarly, if no additional remuneration is paid, the related Finding(s) and
Procedure(s) for additional remuneration are not applicable.
Result
Ref Procedures Standard factual finding (C / E /
N.A.)
ACTUAL PERSONNEL COSTS AND UNIT COSTS CALCULATED BY THE BENEFICIARY IN ACCORDANCE WITH ITS USUAL
A
COST ACCOUNTING PRACTICE
The Auditor draws a sample of persons whose costs were declared in the Financial Statement(s)
to carry out the procedures indicated in the consecutive points of this section A.
(The sample should be selected randomly so that it is representative. Full coverage is required if
there are fewer than 10 people (including employees, natural persons working under a direct
contract and personnel seconded by a third party), otherwise the sample should have a minimum
of 10 people, or 10% of the total, whichever number is the highest)
The Auditor sampled ______ people out of the total of ______ people.
8
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Result
Ref Procedures Standard factual finding (C / E /
N.A.)
A.1 PERSONNEL COSTS
1) The employees were i) directly
For the persons included in the sample and working under an employment contract or equivalent hired by the Beneficiary in
act (general procedures for individual actual personnel costs and personnel costs declared as unit accordance with its national
costs) legislation, ii) under the
Beneficiary’s sole technical
To confirm standard factual findings 1-5 listed in the next column, the Auditor reviewed
supervision and responsibility
following information/documents provided by the Beneficiary:
and iii) remunerated in
o a list of the persons included in the sample indicating the period(s) during which they accordance with the
worked for the action, their position (classification or category) and type of contract; Beneficiary’s usual practices.
o the payslips of the employees included in the sample;
o reconciliation of the personnel costs declared in the Financial Statement(s) with the 2) Personnel costs were recorded in
accounting system (project accounting and general ledger) and payroll system; the Beneficiary's
accounts/payroll system.
o information concerning the employment status and employment conditions of personnel
included in the sample, in particular their employment contracts or equivalent;
3) Costs were adequately supported
o the Beneficiary’s usual policy regarding payroll matters (e.g. salary policy, overtime
and reconciled with the accounts
policy, variable pay);
and payroll records.
o applicable national law on taxes, labour and social security and
o any other document that supports the personnel costs declared. 4) Personnel costs did not contain
The Auditor also verified the eligibility of all components of the retribution (see Article 6 GA) any ineligible elements.
and recalculated the personnel costs for employees included in the sample.
5) There were no discrepancies
between the personnel costs
charged to the action and the
costs recalculated by the
Auditor.
Further procedures if ‘additional remuneration’ is paid 6) The Beneficiary paying
To confirm standard factual findings 6-9 listed in the next column, the Auditor: “additional remuneration” was a
non-profit legal entity.
o reviewed relevant documents provided by the Beneficiary (legal form, legal/statutory
9
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Result
Ref Procedures Standard factual finding (C / E /
N.A.)
obligations, the Beneficiary’s usual policy on additional remuneration, criteria used for
7) The amount of additional
its calculation…);
remuneration paid corresponded
o recalculated the amount of additional remuneration eligible for the action based on the to the Beneficiary’s usual
supporting documents received (full-time or part-time work, exclusive or non-exclusive remuneration practices and was
dedication to the action, etc.) to arrive at the applicable FTE/year and pro-rata rate (see consistently paid whenever the
data collected in the course of carrying out the procedures under A.2 ‘Productive hours’ same kind of work or expertise
and A.4 ‘Time recording system’). was required.
8) The criteria used to calculate the
IF ANY PART OF THE REMUNERATION PAID TO THE EMPLOYEE IS NOT MANDATORY ACCORDING TO THE additional remuneration were
NATIONAL LAW OR THE EMPLOYMENT CONTRACT ("ADDITIONAL REMUNERATION") AND IS ELIGIBLE objective and generally applied
UNDER THE PROVISIONS OF ARTICLE 6.2.A.1, THIS CAN BE CHARGED AS ELIGIBLE COST TO THE by the Beneficiary regardless of
ACTION UP TO THE FOLLOWING AMOUNT: the source of funding used.
(A) IF THE PERSON WORKS FULL TIME AND EXCLUSIVELY ON THE ACTION DURING THE FULL
9) The amount of additional
YEAR: UP TO EUR 8 000/YEAR;
remuneration included in the
(B) IF THE PERSON WORKS EXCLUSIVELY ON THE ACTION BUT NOT FULL-TIME OR NOT FOR THE personnel costs charged to the
FULL YEAR: UP TO THE CORRESPONDING PRO-RATA AMOUNT OF EUR 8 000, OR action was capped at EUR 8,000
(C) IF THE PERSON DOES NOT WORK EXCLUSIVELY ON THE ACTION: UP TO A PRO-RATA AMOUNT
per FTE/year (up to the
CALCULATED IN ACCORDANCE TO ARTICLE 6.2.A.1.
equivalent pro-rata amount if the
person did not work on the
action full-time during the year
or did not work exclusively on
the action).
10) The personnel costs included in
Additional procedures in case “unit costs calculated by the Beneficiary in accordance with its
the Financial Statement were
usual cost accounting practices” is applied:
calculated in accordance with
Apart from carrying out the procedures indicated above to confirm standard factual findings 1-5 the Beneficiary's usual cost
and, if applicable, also 6-9, the Auditor carried out following procedures to confirm standard accounting practice. This
methodology was consistently
10
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Result
Ref Procedures Standard factual finding (C / E /
N.A.)
factual findings 10-13 listed in the next column: used in all H2020 actions.
o obtained a description of the Beneficiary's usual cost accounting practice to calculate unit 11) The employees were charged
costs;. under the correct category.
o reviewed whether the Beneficiary's usual cost accounting practice was applied for the
12) Total personnel costs used in
Financial Statements subject of the present CFS;
calculating the unit costs were
o verified the employees included in the sample were charged under the correct category consistent with the expenses
(in accordance with the criteria used by the Beneficiary to establish personnel categories) recorded in the statutory
by reviewing the contract/HR-record or analytical accounting records; accounts.
o verified that there is no difference between the total amount of personnel costs used in 13) Any estimated or budgeted
calculating the cost per unit and the total amount of personnel costs recorded in the element used by the
statutory accounts; Beneficiary in its unit-cost
calculation were relevant for
o verified whether actual personnel costs were adjusted on the basis of budgeted or
calculating personnel costs and
estimated elements and, if so, verified whether those elements used are actually relevant
for the calculation, objective and supported by documents. corresponded to objective and
verifiable information.
14) The natural persons reported to
For natural persons included in the sample and working with the Beneficiary under a direct
the Beneficiary (worked under
contract other than an employment contract, such as consultants (no subcontractors).
the Beneficiary’s instructions).
To confirm standard factual findings 14-18 listed in the next column the Auditor reviewed
15) They worked on the
following information/documents provided by the Beneficiary:
Beneficiary’s premises (unless
o the contracts, especially the cost, contract duration, work description, place of work, otherwise agreed with the
ownership of the results and reporting obligations to the Beneficiary; Beneficiary).
o the employment conditions of staff in the same category to compare costs and; 16) The results of work carried out
o any other document that supports the costs declared and its registration (e.g. invoices, belong to the Beneficiary.
11
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Result
Ref Procedures Standard factual finding (C / E /
N.A.)
accounting records, etc.). 17) Their costs were not
significantly different from
those for staff who performed
similar tasks under an
employment contract with the
Beneficiary.
18) The costs were supported by
audit evidence and registered
in the accounts.
For personnel seconded by a third party and included in the sample (not subcontractors) 19) Seconded personnel reported to
the Beneficiary and worked on
To confirm standard factual findings 19-22 listed in the next column, the Auditor reviewed
the Beneficiary’s premises
following information/documents provided by the Beneficiary:
(unless otherwise agreed with
o their secondment contract(s) notably regarding costs, duration, work description, place of the Beneficiary).
work and ownership of the results;
20) The results of work carried out
o if there is reimbursement by the Beneficiary to the third party for the resource made belong to the Beneficiary.
available (in-kind contribution against payment): any documentation that supports the
costs declared (e.g. contract, invoice, bank payment, and proof of registration in its If personnel is seconded against
accounting/payroll, etc.) and reconciliation of the Financial Statement(s) with the payment:
accounting system (project accounting and general ledger) as well as any proof that the 21) The costs declared were
amount invoiced by the third party did not include any profit; supported with documentation
o if there is no reimbursement by the Beneficiary to the third party for the resource made and recorded in the
available (in-kind contribution free of charge): a proof of the actual cost borne by the Beneficiary’s accounts. The
Third Party for the resource made available free of charge to the Beneficiary such as a third party did not include any
statement of costs incurred by the Third Party and proof of the registration in the Third profit.
Party's accounting/payroll; If personnel is seconded free of
o any other document that supports the costs declared (e.g. invoices, etc.). charge:
22) The costs declared did not
exceed the third party's cost as
12
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Result
Ref Procedures Standard factual finding (C / E /
N.A.)
recorded in the accounts of the
third party and were supported
with documentation.
A.2 PRODUCTIVE HOURS 23) The Beneficiary applied
method [choose one option and
To confirm standard factual findings 23-28 listed in the next column, the Auditor reviewed delete the others]
relevant documents, especially national legislation, labour agreements and contracts and time
[A: 1720 hours]
records of the persons included in the sample, to verify that:
[B: the ‘total number of hours
o the annual productive hours applied were calculated in accordance with one of the
worked’]
methods described below,
[C: ‘standard annual
o the full-time equivalent (FTEs) ratios for employees not working full-time were correctly
productive hours’ used
calculated.
correspond to usual accounting
If the Beneficiary applied method B, the auditor verified that the correctness in which the total practices]
number of hours worked was calculated and that the contracts specified the annual workable 24) Productive hours were
hours. calculated annually.
If the Beneficiary applied method C, the auditor verified that the ‘annual productive hours’ 25) For employees not working
applied when calculating the hourly rate were equivalent to at least 90 % of the ‘standard annual full-time the full-time
workable hours’. The Auditor can only do this if the calculation of the standard annual workable equivalent (FTE) ratio was
hours can be supported by records, such as national legislation, labour agreements, and contracts. correctly applied.
If the Beneficiary applied method
BENEFICIARY'S PRODUCTIVE HOURS' FOR PERSONS WORKING FULL TIME SHALL BE ONE OF THE B.
FOLLOWING METHODS:
26) The calculation of the number
A. 1720 ANNUAL PRODUCTIVE HOURS (PRO-RATA FOR PERSONS NOT WORKING FULL-TIME) of ‘annual workable hours’,
B. THE TOTAL NUMBER OF HOURS WORKED BY THE PERSON FOR THE BENEFICIARY IN THE YEAR overtime and absences was
(THIS METHOD IS ALSO REFERRED TO AS ‘TOTAL NUMBER OF HOURS WORKED’ IN THE NEXT verifiable based on the
COLUMN). THE CALCULATION OF THE TOTAL NUMBER OF HOURS WORKED WAS DONE AS documents provided by the
FOLLOWS: ANNUAL WORKABLE HOURS OF THE PERSON ACCORDING TO THE EMPLOYMENT Beneficiary.
13
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Result
Ref Procedures Standard factual finding (C / E /
N.A.)
CONTRACT, APPLICABLE LABOUR AGREEMENT OR NATIONAL LAW PLUS OVERTIME WORKED 26.1) The Beneficiary calculates
MINUS ABSENCES (SUCH AS SICK LEAVE OR SPECIAL LEAVE). the hourly rates per full
financial year following
C. THE STANDARD NUMBER OF ANNUAL HOURS GENERALLY APPLIED BY THE BENEFICIARY FOR ITS
procedure A.3 (method B
PERSONNEL IN ACCORDANCE WITH ITS USUAL COST ACCOUNTING PRACTICES (THIS METHOD IS
is not allowed for
ALSO REFERRED TO AS ‘STANDARD ANNUAL PRODUCTIVE HOURS’ IN THE NEXT COLUMN). THIS
beneficiaries calculating
NUMBER MUST BE AT LEAST 90% OF THE STANDARD ANNUAL WORKABLE HOURS.
hourly rates per month).
If the Beneficiary applied method
‘ANNUAL WORKABLE HOURS’ MEANS THE PERIOD DURING WHICH THE PERSONNEL MUST BE C.
WORKING, AT THE EMPLOYER’S DISPOSAL AND CARRYING OUT HIS/HER ACTIVITY OR DUTIES UNDER
THE EMPLOYMENT CONTRACT, APPLICABLE COLLECTIVE LABOUR AGREEMENT OR NATIONAL
27) The calculation of the number
WORKING TIME LEGISLATION.
of ‘standard annual workable
hours’ was verifiable based on
the documents provided by the
Beneficiary.
28) The ‘annual productive hours’
used for calculating the hourly
rate were consistent with the
usual cost accounting practices
of the Beneficiary and were
equivalent to at least 90 % of
the ‘annual workable hours’.
A.3 HOURLY PERSONNEL RATES 29) The Beneficiary applied
[choose one option and delete
I) For unit costs calculated in accordance to the Beneficiary's usual cost accounting practice (unit the other]:
costs):
[Option I: “Unit costs (hourly
If the Beneficiary has a "Certificate on Methodology to calculate unit costs " (CoMUC) approved rates) were calculated in
by the Commission, the Beneficiary provides the Auditor with a description of the approved accordance with the
methodology and the Commission’s letter of acceptance. The Auditor verified that the Beneficiary’s usual cost
14
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Result
Ref Procedures Standard factual finding (C / E /
N.A.)
Beneficiary has indeed used the methodology approved. If so, no further verification is necessary. accounting practices”]
If the Beneficiary does not have a "Certificate on Methodology" (CoMUC) approved by the [Option II: Individual hourly
Commission, or if the methodology approved was not applied, then the Auditor: rates were applied]
o reviewed the documentation provided by the Beneficiary, including manuals and internal
For option I concerning unit costs
guidelines that explain how to calculate hourly rates;
and if the Beneficiary applies the
o recalculated the unit costs (hourly rates) of staff included in the sample following the methodology approved by the
results of the procedures carried out in A.1 and A.2. Commission (CoMUC):
30) The Beneficiary used the
II) For individual hourly rates:
Commission-approved metho-
The Auditor: dology to calculate hourly
rates. It corresponded to the
o reviewed the documentation provided by the Beneficiary, including manuals and internal
organisation's usual cost
guidelines that explain how to calculate hourly rates;
accounting practices and was
o recalculated the hourly rates of staff included in the sample (recalculation of all hourly applied consistently for all
rates if the Beneficiary uses annual rates, recalculation of three months selected randomly activities irrespective of the
for every year and person if the Beneficiary uses monthly rates) following the results of source of funding.
the procedures carried out in A.1 and A.2;
For option I concerning unit costs
o (only in case of monthly rates) confirmed that the time spent on parental leave is not and if the Beneficiary applies a
deducted, and that, if parts of the basic remuneration are generated over a period longer methodology not approved by the
than a month, the Beneficiary has included only the share which is generated in the Commission:
month.
31) The unit costs re-calculated by
“UNIT COSTS CALCULATED BY THE BENEFICIARY IN ACCORDANCE WITH ITS USUAL COST the Auditor were the same as
ACCOUNTING PRACTICES”:
the rates applied by the
IT IS CALCULATED BY DIVIDING THE TOTAL AMOUNT OF PERSONNEL COSTS OF THE CATEGORY TO Beneficiary.
WHICH THE EMPLOYEE BELONGS VERIFIED IN LINE WITH PROCEDURE A.1 BY THE NUMBER OF FTE For option II concerning individual
AND THE ANNUAL TOTAL PRODUCTIVE HOURS OF THE SAME CATEGORY CALCULATED BY THE hourly rates:
BENEFICIARY IN ACCORDANCE WITH PROCEDURE A.2.
32) The individual rates re-
15
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Result
Ref Procedures Standard factual finding (C / E /
N.A.)
HOURLY RATE FOR INDIVIDUAL ACTUAL PERSONAL COSTS: calculated by the Auditor were
IT IS CALCULATED FOLLOWING ONE OF THE TWO OPTIONS BELOW: the same as the rates applied by
the Beneficiary.
A) [OPTION BY DEFAULT] BY DIVIDING THE ACTUAL ANNUAL AMOUNT OF PERSONNEL COSTS OF AN
32.1) The Beneficiary used only
EMPLOYEE VERIFIED IN LINE WITH PROCEDURE A.1 BY THE NUMBER OF ANNUAL PRODUCTIVE HOURS
one option (per full financial
VERIFIED IN LINE WITH PROCEDURE A.2 (FULL FINANCIAL YEAR HOURLY RATE);
year or per month) throughout
each financial year examined.
B) BY DIVIDING THE ACTUAL MONTHLY AMOUNT OF PERSONNEL COSTS OF AN EMPLOYEE VERIFIED IN
LINE WITH PROCEDURE A.1 BY 1/12 OF THE NUMBER OF ANNUAL PRODUCTIVE HOURS VERIFIED IN
LINE WITH PROCEDURE A.2.(MONTHLY HOURLY RATE).
A.4 TIME RECORDING SYSTEM
33) All persons recorded their time
To verify that the time recording system ensures the fulfilment of all minimum requirements and dedicated to the action on a
that the hours declared for the action were correct, accurate and properly authorised and daily/ weekly/ monthly basis
supported by documentation, the Auditor made the following checks for the persons included in using a paper/computer-
the sample that declare time as worked for the action on the basis of time records: based system. (delete the
answers that are not
o description of the time recording system provided by the Beneficiary (registration,
applicable)
authorisation, processing in the HR-system);
o its actual implementation; 34) Their time-records were
authorised at least monthly by
o time records were signed at least monthly by the employees (on paper or electronically)
the project manager or other
and authorised by the project manager or another manager;
superior.
o the hours declared were worked within the project period;
o there were no hours declared as worked for the action if HR-records showed absence due 35) Hours declared were worked
to holidays or sickness (further cross-checks with travels are carried out in B.1 below) ; within the project period and
were consistent with the
o the hours charged to the action matched those in the time recording system. presences/absences recorded in
HR-records.
16
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Result
Ref Procedures Standard factual finding (C / E /
N.A.)
ONLY THE HOURS WORKED ON THE ACTION CAN BE CHARGED. ALL WORKING TIME TO BE CHARGED 36) There were no discrepancies
SHOULD BE RECORDED THROUGHOUT THE DURATION OF THE PROJECT, ADEQUATELY SUPPORTED BY between the number of hours
EVIDENCE OF THEIR REALITY AND RELIABILITY (SEE SPECIFIC PROVISIONS BELOW FOR PERSONS charged to the action and the
WORKING EXCLUSIVELY FOR THE ACTION WITHOUT TIME RECORDS). number of hours recorded.
If the persons are working exclusively for the action and without time records 37) The exclusive dedication is
supported by a declaration
For the persons selected that worked exclusively for the action without time records, the Auditor
signed by the Beneficiary’s and
verified evidence available demonstrating that they were in reality exclusively dedicated to the
by any other evidence
action and that the Beneficiary signed a declaration confirming that they have worked exclusively
gathered.
for the action.
B COSTS OF SUBCONTRACTING
B.1 The Auditor obtained the detail/breakdown of subcontracting costs and sampled ______ 38) The use of claimed
cost items selected randomly (full coverage is required if there are fewer than 10 items, subcontracting costs was
otherwise the sample should have a minimum of 10 item, or 10% of the total, whichever number foreseen in Annex 1 and costs
is highest). were declared in the Financial
Statements under the
To confirm standard factual findings 38-42 listed in the next column, the Auditor reviewed the
subcontracting category.
following for the items included in the sample:
o the use of subcontractors was foreseen in Annex 1; 39) There were documents of
requests to different providers,
o subcontracting costs were declared in the subcontracting category of the Financial different offers and assessment
Statement; of the offers before selection of
o supporting documents on the selection and award procedure were followed; the provider in line with
internal procedures and
o the Beneficiary ensured best value for money (key elements to appreciate the respect of procurement rules.
this principle are the award of the subcontract to the bid offering best price-quality ratio, Subcontracts were awarded in
under conditions of transparency and equal treatment. In case an existing framework accordance with the principle
contract was used the Beneficiary ensured it was established on the basis of the principle of best value for money.
of best value for money under conditions of transparency and equal treatment).
(When different offers were not
collected the Auditor explains
17
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Result
Ref Procedures Standard factual finding (C / E /
N.A.)
In particular, the reasons provided by the
Beneficiary under the caption
i. if the Beneficiary acted as a contracting authority within the meaning of Directive
“Exceptions” of the Report.
2004/18/EC (or 2014/24/EU) or of Directive 2004/17/EC (or 2014/25/EU), the Auditor
The Commission will analyse
verified that the applicable national law on public procurement was followed and that the
this information to evaluate
subcontracting complied with the Terms and Conditions of the Agreement.
whether these costs might be
ii. if the Beneficiary did not fall under the above-mentioned category the Auditor verified accepted as eligible)
that the Beneficiary followed their usual procurement rules and respected the Terms and
Conditions of the Agreement.. 40) The subcontracts were not
awarded to other Beneficiaries
For the items included in the sample the Auditor also verified that: of the consortium.
o the subcontracts were not awarded to other Beneficiaries in the consortium;
41) All subcontracts were
o there were signed agreements between the Beneficiary and the subcontractor; supported by signed
o there was evidence that the services were provided by subcontractor; agreements between the
Beneficiary and the
subcontractor.
42) There was evidence that the
services were provided by the
subcontractors.
C COSTS OF PROVIDING FINANCIAL SUPPORT TO THIRD PARTIES
C.1 The Auditor obtained the detail/breakdown of the costs of providing financial support to
third parties and sampled ______ cost items selected randomly (full coverage is required if
there are fewer than 10 items, otherwise the sample should have a minimum of 10 item, or 10% of
the total, whichever number is highest). 43) All minimum conditions were
met
The Auditor verified that the following minimum conditions were met:
a) the maximum amount of financial support for each third party did not exceed EUR 60
000, unless explicitly mentioned in Annex 1;
18
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Result
Ref Procedures Standard factual finding (C / E /
N.A.)
b) the financial support to third parties was agreed in Annex 1 of the Agreement and the
other provisions on financial support to third parties included in Annex 1 were respected.
19
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
D OTHER ACTUAL DIRECT COSTS
D.1 COSTS OF TRAVEL AND RELATED SUBSISTENCE ALLOWANCES 44) Costs were incurred, approved
and reimbursed in line with the
The Auditor sampled ______ cost items selected randomly (full coverage is required if there
Beneficiary's usual policy for
are fewer than 10 items, otherwise the sample should have a minimum of 10 item, or 10% of the
travels.
total, whichever number is the highest).
The Auditor inspected the sample and verified that: 45) There was a link between the
o travel and subsistence costs were consistent with the Beneficiary's usual policy for travel. trip and the action.
In this context, the Beneficiary provided evidence of its normal policy for travel costs
46) The supporting documents
(e.g. use of first class tickets, reimbursement by the Beneficiary on the basis of actual
were consistent with each other
costs, a lump sum or per diem) to enable the Auditor to compare the travel costs charged
regarding subject of the trip,
with this policy;
dates, duration and reconciled
o travel costs are correctly identified and allocated to the action (e.g. trips are directly with time records and
linked to the action) by reviewing relevant supporting documents such as minutes of accounting.
meetings, workshops or conferences, their registration in the correct project account, their
consistency with time records or with the dates/duration of the workshop/conference; 47) No ineligible costs or excessive
or reckless expenditure was
o no ineligible costs or excessive or reckless expenditure was declared. declared.
D.2 DEPRECIATION COSTS FOR EQUIPMENT, INFRASTRUCTURE OR OTHER
ASSETS 48) Procurement rules, principles
and guides were followed.
The Auditor sampled ______ cost items selected randomly (full coverage is required if there
are fewer than 10 items, otherwise the sample should have a minimum of 10 item, or 10% of the
total, whichever number is the highest). 49) There was a link between the
grant agreement and the asset
For “equipment, infrastructure or other assets” [from now on called “asset(s)”] selected in the charged to the action.
sample the Auditor verified that:
50) The asset charged to the action
o the assets were acquired in conformity with the Beneficiary's internal guidelines and was traceable to the accounting
procedures; records and the underlying
o they were correctly allocated to the action (with supporting documents such as delivery documents.
20
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
note invoice or any other proof demonstrating the link to the action) 51) The depreciation method used
to charge the asset to the action
o they were entered in the accounting system;
was in line with the applicable
o the extent to which the assets were used for the action (as a percentage) was supported by rules of the Beneficiary's
reliable documentation (e.g. usage overview table); country and the Beneficiary's
usual accounting policy.
The Auditor recalculated the depreciation costs and verified that they were in line with the
applicable rules in the Beneficiary’s country and with the Beneficiary’s usual accounting policy 52) The amount charged
(e.g. depreciation calculated on the acquisition value). corresponded to the actual
usage for the action.
The Auditor verified that no ineligible costs such as deductible VAT, exchange rate losses,
excessive or reckless expenditure were declared (see Article 6.5 GA). 53) No ineligible costs or excessive
or reckless expenditure were
declared.
D.3 COSTS OF OTHER GOODS AND SERVICES 54) Contracts for works or services
did not cover tasks described in
The Auditor sampled ______ cost items selected randomly (full coverage is required if there
Annex 1.
are fewer than 10 items, otherwise the sample should have a minimum of 10 item, or 10% of the
total, whichever number is highest). 55) Costs were allocated to the
For the purchase of goods, works or services included in the sample the Auditor verified that: correct action and the goods
were not placed in the
o the contracts did not cover tasks described in Annex 1; inventory of durable
o they were correctly identified, allocated to the proper action, entered in the accounting equipment.
system (traceable to underlying documents such as purchase orders, invoices and 56) The costs were charged in line
accounting); with the Beneficiary’s
o the goods were not placed in the inventory of durable equipment; accounting policy and were
adequately supported.
o the costs charged to the action were accounted in line with the Beneficiary’s usual
accounting practices; 57) No ineligible costs or excessive
o no ineligible costs or excessive or reckless expenditure were declared (see Article 6 GA). or reckless expenditure were
declared. For internal
In addition, the Auditor verified that these goods and services were acquired in conformity with invoices/charges only the cost
the Beneficiary's internal guidelines and procedures, in particular: element was charged, without
o if Beneficiary acted as a contracting authority within the meaning of Directive any mark-ups.
21
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
2004/18/EC (or 2014/24/EU) or of Directive 2004/17/EC (or 2014/25/EU), the Auditor 58) Procurement rules, principles
verified that the applicable national law on public procurement was followed and that the and guides were followed.
procurement contract complied with the Terms and Conditions of the Agreement. There were documents of
requests to different providers,
o if the Beneficiary did not fall into the category above, the Auditor verified that the
different offers and assessment
Beneficiary followed their usual procurement rules and respected the Terms and
of the offers before selection of
Conditions of the Agreement.
the provider in line with
For the items included in the sample the Auditor also verified that: internal procedures and
o the Beneficiary ensured best value for money (key elements to appreciate the respect of procurement rules. The
this principle are the award of the contract to the bid offering best price-quality ratio, purchases were made in
under conditions of transparency and equal treatment. In case an existing framework accordance with the principle
contract was used the Auditor also verified that the Beneficiary ensured it was established of best value for money.
on the basis of the principle of best value for money under conditions of transparency and (When different offers were not
equal treatment); collected the Auditor explains
SUCH GOODS AND SERVICES INCLUDE, FOR INSTANCE, CONSUMABLES AND SUPPLIES, DISSEMINATION the reasons provided by the
(INCLUDING OPEN ACCESS), PROTECTION OF RESULTS, SPECIFIC EVALUATION OF THE ACTION IF IT IS Beneficiary under the caption
REQUIRED BY THE AGREEMENT, CERTIFICATES ON THE FINANCIAL STATEMENTS IF THEY ARE
“Exceptions” of the Report.
REQUIRED BY THE AGREEMENT AND CERTIFICATES ON THE METHODOLOGY, TRANSLATIONS,
The Commission will analyse
REPRODUCTION.
this information to evaluate
whether these costs might be
accepted as eligible)
D.4 AGGREGATED CAPITALISED AND OPERATING COSTS OF RESEARCH
59) The costs declared as direct
INFRASTRUCTURE
costs for Large Research
The Auditor ensured the existence of a positive ex-ante assessment (issued by the EC Services) of Infrastructures (in the
the cost accounting methodology of the Beneficiary allowing it to apply the guidelines on direct appropriate line of the
costing for large research infrastructures in Horizon 2020. Financial Statement) comply
with the methodology
described in the positive ex-
In the cases that a positive ex-ante assessment has been issued (see the standard factual
ante assessment report.
findings 59-60 on the next column),
22
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
The Auditor ensured that the beneficiary has applied consistently the methodology that is 60) Any difference between the
explained and approved in the positive ex ante assessment; methodology applied and the
one positively assessed was
In the cases that a positive ex-ante assessment has NOT been issued (see the standard factual extensively described and
findings 61 on the next column), adjusted accordingly.
The Auditor verified that no costs of Large Research Infrastructure have been charged as
direct costs in any costs category;
In the cases that a draft ex-ante assessment report has been issued with recommendation for 61) The direct costs declared were
further changes (see the standard factual findings 61 on the next column), free from any indirect costs
items related to the Large
The Auditor followed the same procedure as above (when a positive ex-ante assessment has
Research Infrastructure.
NOT yet been issued) and paid particular attention (testing reinforced) to the cost items for
which the draft ex-ante assessment either rejected the inclusion as direct costs for Large
Research Infrastructures or issued recommendations.
E USE OF EXCHANGE RATES
E.1 a) For Beneficiaries with accounts established in a currency other than euros
The Auditor sampled ______ cost items selected randomly and verified that the exchange
rates used for converting other currencies into euros were in accordance with the following
rules established in the Agreement ( full coverage is required if there are fewer than 10 items,
otherwise the sample should have a minimum of 10 item, or 10% of the total, whichever number
is highest): 62) The exchange rates used to
convert other currencies into
COSTS RECORDED IN THE ACCOUNTS IN A CURRENCY OTHER THAN EURO SHALL BE CONVERTED INTO Euros were in accordance with
EURO AT THE AVERAGE OF THE DAILY EXCHANGE RATES PUBLISHED IN THE C SERIES OF OFFICIAL the rules established of the
JOURNAL OF THE EUROPEAN UNION Grant Agreement and there
(https://www.ecb.int/stats/exchange/eurofxref/html/index.en.html ), DETERMINED OVER THE was no difference in the final
CORRESPONDING REPORTING PERIOD. figures.
IF NO DAILY EURO EXCHANGE RATE IS PUBLISHED IN THE OFFICIAL JOURNAL OF THE EUROPEAN
UNION FOR THE CURRENCY IN QUESTION, CONVERSION SHALL BE MADE AT THE AVERAGE OF THE
MONTHLY ACCOUNTING RATES ESTABLISHED BY THE COMMISSION AND PUBLISHED ON ITS WEBSITE
(http://ec.europa.eu/budget/contracts_grants/info_contracts/inforeuro/inforeuro_en.cfm ),
DETERMINED OVER THE CORRESPONDING REPORTING PERIOD.
23
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
b) For Beneficiaries with accounts established in euros
The Auditor sampled ______ cost items selected randomly and verified that the exchange
rates used for converting other currencies into euros were in accordance with the following
rules established in the Agreement ( full coverage is required if there are fewer than 10 items, 63) The Beneficiary applied its
otherwise the sample should have a minimum of 10 item, or 10% of the total, whichever number usual accounting practices.
is highest):
COSTS INCURRED IN ANOTHER CURRENCY SHALL BE CONVERTED INTO EURO BY APPLYING THE
BENEFICIARY’S USUAL ACCOUNTING PRACTICES.
[legal name of the audit firm]
[name and function of an authorised representative]
[dd Month yyyy]
<Signature of the Auditor>
24
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements: H2020 General MGA — Multi: v3.0 – dd.mm.2016
ANNEX 6
MODEL FOR THE CERTIFICATE ON THE METHODOLOGY
For options [in italics in square brackets]: choose the applicable option. Options not chosen
should be deleted.
For fields in [grey in square brackets]: enter the appropriate data.
TABLE OF CONTENTS
TERMS OF REFERENCE FOR AN AUDIT ENGAGEMENT FOR A METHODOLOGY CERTIFICATE IN
CONNECTION WITH ONE OR MORE GRANT AGREEMENTS FINANCED UNDER THE HORIZON 2020
RESEARCH AND INNOVATION FRAMEWORK PROGRAMME
INDEPENDENT REPORT OF FACTUAL FINDINGS ON THE METHODOLOGY CONCERNING GRANT
AGREEMENTS FINANCED UNDER THE HORIZON 2020 RESEARCH AND INNOVATION
FRAMEWORK PROGRAMME
1
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements: H2020 General MGA — Multi: v3.0 – dd.mm.2016
Terms of reference for an audit engagement for a methodology certificate
in connection with one or more grant agreements financed
under the Horizon 2020 Research and Innovation Framework Programme
This document sets out the ‘Terms of Reference (ToR)’ under which
[OPTION 1: [insert name of the beneficiary] (‘the Beneficiary’)] [OPTION 2: [insert name of the
linked third party] (‘the Linked Third Party’), third party linked to the Beneficiary [insert name of the
beneficiary] (‘the Beneficiary’)]
agrees to engage
[insert legal name of the auditor] (‘the Auditor’)
to produce an independent report of factual findings (‘the Report’) concerning the [Beneficiary’s]
[Linked Third Party’s] usual accounting practices for calculating and claiming direct personnel costs
declared as unit costs (‘the Methodology’) in connection with grant agreements financed under the
Horizon 2020 Research and Innovation Framework Programme.
The procedures to be carried out for the assessment of the methodology will be based on the grant
agreement(s) detailed below:
[title and number of the grant agreement(s)] (‘the Agreement(s)’)
The Agreement(s) has(have) been concluded between the Beneficiary and [OPTION 1: the European
Union, represented by the European Commission (‘the Commission’)][ OPTION 2: the European
Atomic Energy Community (Euratom,) represented by the European Commission (‘the
Commission’)][OPTION 3: the [Research Executive Agency (REA)] [European Research Council
Executive Agency (ERCEA)] [Innovation and Networks Executive Agency (INEA)] [Executive Agency
for Small and Medium-sized Enterprises (EASME)] (‘the Agency’), under the powers delegated by the
European Commission (‘the Commission’).].
The [Commission] [Agency] is mentioned as a signatory of the Agreement with the Beneficiary only.
The [European Union] [Euratom] [Agency] is not a party to this engagement.
1.1 Subject of the engagement
According to Article 18.1.2 of the Agreement, beneficiaries [and linked third parties] that declare
direct personnel costs as unit costs calculated in accordance with their usual cost accounting practices
may submit to the [Commission] [Agency], for approval, a certificate on the methodology (‘CoMUC’)
stating that there are adequate records and documentation to prove that their cost accounting practices
used comply with the conditions set out in Point A of Article 6.2.
The subject of this engagement is the CoMUC which is composed of two separate documents:
- the Terms of Reference (‘the ToR’) to be signed by the [Beneficiary] [Linked Third Party]
and the Auditor;
- the Auditor’s Independent Report of Factual Findings (‘the Report’) issued on the Auditor’s
letterhead, dated, stamped and signed by the Auditor which includes; the standard statements
(‘the Statements’) evaluated and signed by the [Beneficiary] [Linked Third Party], the agreed-
upon procedures (‘the Procedures’) performed by the Auditor and the standard factual findings
2
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements: H2020 General MGA — Multi: v3.0 – dd.mm.2016
(‘the Findings’) assessed by the Auditor. The Statements, Procedures and Findings are
summarised in the table that forms part of the Report.
The information provided through the Statements, the Procedures and the Findings will enable the
Commission to draw conclusions regarding the existence of the [Beneficiary’s] [Linked Third Party’s]
usual cost accounting practice and its suitability to ensure that direct personnel costs claimed on that
basis comply with the provisions of the Agreement. The Commission draws its own conclusions from
the Report and any additional information it may require.
1.2 Responsibilities
The parties to this agreement are the [Beneficiary] [Linked Third Party] and the Auditor.
The [Beneficiary] [Linked Third Party]:
is responsible for preparing financial statements for the Agreement(s) (‘the Financial
Statements’) in compliance with those Agreements;
is responsible for providing the Financial Statement(s) to the Auditor and enabling the Auditor
to reconcile them with the [Beneficiary’s] [Linked Third Party’s] accounting and
bookkeeping system and the underlying accounts and records. The Financial Statement(s) will
be used as a basis for the procedures which the Auditor will carry out under this ToR;
is responsible for its Methodology and liable for the accuracy of the Financial Statement(s);
is responsible for endorsing or refuting the Statements indicated under the heading
‘Statements to be made by the Beneficiary/ Linked Third Party’ in the first column of the table
that forms part of the Report;
must provide the Auditor with a signed and dated representation letter;
accepts that the ability of the Auditor to carry out the Procedures effectively depends upon the
[Beneficiary] [Linked Third Party] providing full and free access to the [Beneficiary’s]
[Linked Third Party’s] staff and to its accounting and other relevant records.
The Auditor:
[Option 1 by default: is qualified to carry out statutory audits of accounting documents in
accordance with Directive 2006/43/EC of the European Parliament and of the Council of 17
May 2006 on statutory audits of annual accounts and consolidated accounts, amending
Council Directives 78/660/EEC and 83/349/EEC and repealing Council Directive
84/253/EEC or similar national regulations].
[Option 2 if the Beneficiary or Linked Third Party has an independent Public Officer: is a
competent and independent Public Officer for which the relevant national authorities have
established the legal capacity to audit the Beneficiary].
[Option 3 if the Beneficiary or Linked Third Party is an international organisation: is an
[internal] [external] auditor in accordance with the internal financial regulations and
procedures of the international organisation].
The Auditor:
must be independent from the Beneficiary [and the Linked Third Party], in particular, it must
not have been involved in preparing the Beneficiary’s [and Linked Third Party’s] Financial
Statement(s);
must plan work so that the Procedures may be carried out and the Findings may be assessed;
must adhere to the Procedures laid down and the compulsory report format;
must carry out the engagement in accordance with these ToR;
must document matters which are important to support the Report;
must base its Report on the evidence gathered;
must submit the Report to the [Beneficiary] [Linked Third Party].
3
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements: H2020 General MGA — Multi: v3.0 – dd.mm.2016
The Commission sets out the Procedures to be carried out and the Findings to be endorsed by the
Auditor. The Auditor is not responsible for their suitability or pertinence. As this engagement is not an
assurance engagement the Auditor does not provide an audit opinion or a statement of assurance.
1.3 Applicable Standards
The Auditor must comply with these Terms of Reference and with1:
- the International Standard on Related Services (‘ISRS’) 4400 Engagements to perform
Agreed-upon Procedures regarding Financial Information as issued by the International
Auditing and Assurance Standards Board (IAASB);
- the Code of Ethics for Professional Accountants issued by the International Ethics Standards
Board for Accountants (IESBA). Although ISRS 4400 states that independence is not a
requirement for engagements to carry out agreed-upon procedures, the Commission requires
that the Auditor also complies with the Code’s independence requirements.
The Auditor’s Report must state that there was no conflict of interests in establishing this Report
between the Auditor and the Beneficiary [and the Linked Third Party] that could have a bearing on the
Report, and must specify – if the service is invoiced - the total fee paid to the Auditor for providing the
Report.
1.4 Reporting
The Report must be written in the language of the Agreement (see Article 20.7 of the Agreement).
Under Article 22 of the Agreement, the Commission, [the Agency], the European Anti-Fraud Office
and the Court of Auditors have the right to audit any work that is carried out under the action and for
which costs are declared from [the European Union] [Euratom] budget. This includes work related to
this engagement. The Auditor must provide access to all working papers related to this assignment if
the Commission[, the Agency], the European Anti-Fraud Office or the European Court of Auditors
requests them.
1.5 Timing
The Report must be provided by [dd Month yyyy].
1.6 Other Terms
[The [Beneficiary] [Linked Third Party] and the Auditor can use this section to agree other specific
terms, such as the Auditor’s fees, liability, applicable law, etc. Those specific terms must not
contradict the terms specified above.]
[legal name of the Auditor] [legal name of the [Beneficiary] [Linked Third Party]]
[name & title of authorised representative] [name & title of authorised representative]
[dd Month yyyy] [dd Month yyyy]
Signature of the Auditor Signature Signature of the [Beneficiary] [Linked Third Party]
1
Supreme Audit Institutions applying INTOSAI-standards may carry out the Procedures according to the
corresponding International Standards of Supreme Audit Institutions and code of ethics issued by INTOSAI
instead of the International Standard on Related Services (‘ISRS’) 4400 and the Code of Ethics for
Professional Accountants issued by the IAASB and the IESBA.
4
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements: H2020 General MGA — Multi: v3.0 – dd.mm.2016
Independent report of factual findings on the methodology concerning grant agreements
financed under the Horizon 2020 Research and Innovation Framework Programme
(To be printed on letterhead paper of the auditor)
To
[ name of contact person(s)], [Position]
[[Beneficiary’s] [Linked Third Party’s] name]
[ Address]
[ dd Month yyyy]
Dear [Name of contact person(s)],
As agreed under the terms of reference dated [dd Month yyyy]
with [OPTION 1: [insert name of the beneficiary] (‘the Beneficiary’)] [OPTION 2: [insert name of
the linked third party] (‘the Linked Third Party’), third party linked to the Beneficiary [insert name of
the beneficiary] (‘the Beneficiary’)],
we
[ name of the auditor] (‘the Auditor’),
established at
[full address/city/state/province/country],
represented by
[name and function of an authorised representative],
have carried out the agreed-upon procedures (‘the Procedures’) and provide hereby our Independent
Report of Factual Findings (‘the Report’), concerning the [Beneficiary’s] [Linked Third Party’s] usual
accounting practices for calculating and declaring direct personnel costs declared as unit costs (‘the
Methodology’).
You requested certain procedures to be carried out in connection with the grant(s)
[title and number of the grant agreement(s)] (‘the Agreement(s)’).
The Report
Our engagement was carried out in accordance with the terms of reference (‘the ToR’) appended to
this Report. The Report includes: the standard statements (‘the Statements’) made by the [Beneficiary]
[Linked Third Party], the agreed-upon procedures (‘the Procedures’) carried out and the standard
factual findings (‘the Findings’) confirmed by us.
The engagement involved carrying out the Procedures and assessing the Findings and the
documentation requested appended to this Report, the results of which the Commission uses to draw
conclusions regarding the acceptability of the Methodology applied by the [Beneficiary] [Linked Third
Party].
5
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements: H2020 General MGA — Multi: v3.0 – dd.mm.2016
The Report covers the methodology used from [dd Month yyyy]. In the event that the [Beneficiary]
[Linked Third Party] changes this methodology, the Report will not be applicable to any Financial
Statement1 submitted thereafter.
The scope of the Procedures and the definition of the standard statements and findings were
determined solely by the Commission. Therefore, the Auditor is not responsible for their suitability or
pertinence.
Since the Procedures carried out constitute neither an audit nor a review made in accordance with
International Standards on Auditing or International Standards on Review Engagements, we do not
give a statement of assurance on the costs declared on the basis of the [Beneficiary’s] [Linked Third
Party’s] Methodology. Had we carried out additional procedures or had we performed an audit or
review in accordance with these standards, other matters might have come to its attention and would
have been included in the Report.
Exceptions
Apart from the exceptions listed below, the [Beneficiary] [Linked Third Party] agreed with the
standard Statements and provided the Auditor all the documentation and accounting information
needed by the Auditor to carry out the requested Procedures and corroborate the standard Findings.
List here any exception and add any information on the cause and possible consequences of each
exception, if known. If the exception is quantifiable, also indicate the corresponding amount.
…..
Explanation of possible exceptions in the form of examples (to be removed from the Report):
i. the [Beneficiary] [Linked Third Party] did not agree with the standard Statement number … because…;
ii. the Auditor could not carry out the procedure … established because …. (e.g. due to the inability to
reconcile key information or the unavailability or inconsistency of data);
iii. the Auditor could not confirm or corroborate the standard Finding number … because ….
Remarks
We would like to add the following remarks relevant for the proper understanding of the Methodology
applied by the [Beneficiary] [Linked Third Party] or the results reported:
Example (to be removed from the Report):
Regarding the methodology applied to calculate hourly rates …
Regarding standard Finding 15 it has to be noted that …
The [Beneficiary] [Linked Third Party] explained the deviation from the benchmark statement XXIV
concerning time recording for personnel with no exclusive dedication to the action in the following manner:
…
Annexes
Please provide the following documents to the auditor and annex them to the report when submitting
this CoMUC to the Commission:
1
Financial Statement in this context refers solely to Annex 4 of the Agreement by which the Beneficiary
declares costs under the Agreement.
6
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements: H2020 General MGA — Multi: v3.0 – dd.mm.2016
1. Brief description of the methodology for calculating personnel costs, productive hours and
hourly rates;
2. Brief description of the time recording system in place;
3. An example of the time records used by the [Beneficiary] [Linked Third Party];
4. Description of any budgeted or estimated elements applied, together with an explanation as to
why they are relevant for calculating the personnel costs and how they are based on objective
and verifiable information;
5. A summary sheet with the hourly rate for direct personnel declared by the [Beneficiary]
[Linked Third Party] and recalculated by the Auditor for each staff member included in the
sample (the names do not need to be reported);
6. A comparative table summarising for each person selected in the sample a) the time claimed
by the [Beneficiary] [Linked Third Party] in the Financial Statement(s) and b) the time
according to the time record verified by the Auditor;
7. A copy of the letter of representation provided to the Auditor.
Use of this Report
This Report has been drawn up solely for the purpose given under Point 1.1 Reasons for the
engagement.
The Report:
- is confidential and is intended to be submitted to the Commission by the [Beneficiary] [Linked
Third Party] in connection with Article 18.1.2 of the Agreement;
- may not be used by the [Beneficiary] [Linked Third Party] or by the Commission for any other
purpose, nor distributed to any other parties;
- may be disclosed by the Commission only to authorised parties, in particular the European
Anti-Fraud Office (OLAF) and the European Court of Auditors.
- relates only to the usual cost accounting practices specified above and does not constitute a
report on the Financial Statements of the [Beneficiary] [Linked Third Party].
No conflict of interest2 exists between the Auditor and the Beneficiary [and the Linked Third Party]
that could have a bearing on the Report. The total fee paid to the Auditor for producing the Report was
EUR ______ (including EUR ______ of deductible VAT).
We look forward to discussing our Report with you and would be pleased to provide any further
information or assistance which may be required.
Yours sincerely
[legal name of the Auditor]
[name and title of the authorised representative]
[dd Month yyyy]
Signature of the Auditor
2
A conflict of interest arises when the Auditor's objectivity to establish the certificate is compromised in fact
or in appearance when the Auditor for instance:
- was involved in the preparation of the Financial Statements;
- stands to benefit directly should the certificate be accepted;
- has a close relationship with any person representing the beneficiary;
- is a director, trustee or partner of the beneficiary; or
- is in any other situation that compromises his or her independence or ability to establish the certificate
impartially.
7
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Statements to be made by the Beneficiary/Linked Third Party (‘the Statements’) and Procedures to be carried out by the Auditor (‘the
Procedures’) and standard factual findings (‘the Findings’) to be confirmed by the Auditor
The Commission reserves the right to provide the auditor with guidance regarding the Statements to be made, the Procedures to be carried out or the
Findings to be ascertained and the way in which to present them. The Commission reserves the right to vary the Statements, Procedures or Findings by
written notification to the Beneficiary/Linked Third Party to adapt the procedures to changes in the grant agreement(s) or to any other circumstances.
If this methodology certificate relates to the Linked Third Party’s usual accounting practices for calculating and claiming direct personnel costs declared as
unit costs any reference here below to ‘the Beneficiary’ is to be considered as a reference to ‘the Linked Third Party’.
Please explain any discrepancies in the body of the Report.
Statements to be made by Beneficiary Procedures to be carried out and Findings to be confirmed by the Auditor
A. Use of the Methodology Procedure:
I. The cost accounting practice described below has been in use since [dd The Auditor checked these dates against the documentation the Beneficiary
Month yyyy]. has provided.
II. The next planned alteration to the methodology used by the Beneficiary Factual finding:
will be from [dd Month yyyy].
1. The dates provided by the Beneficiary were consistent with the
documentation.
B. Description of the Methodology Procedure:
III. The methodology to calculate unit costs is being used in a consistent The Auditor reviewed the description, the relevant manuals and/or internal
manner and is reflected in the relevant procedures. guidance documents describing the methodology.
[Please describe the methodology your entity uses to calculate personnel costs, Factual finding:
productive hours and hourly rates, present your description to the Auditor and
annex it to this certificate] 2. The brief description was consistent with the relevant manuals, internal
guidance and/or other documentary evidence the Auditor has reviewed.
[If the statement of section “B. Description of the methodology” cannot be 3. The methodology was generally applied by the Beneficiary as part of its
endorsed by the Beneficiary or there is no written methodology to calculate unit usual costs accounting practices.
costs it should be listed here below and reported as exception by the Auditor in the
main Report of Factual Findings:
- …]
C. Personnel costs Procedure:
General The Auditor draws a sample of employees to carry out the procedures indicated in
8
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Please explain any discrepancies in the body of the Report.
Statements to be made by Beneficiary Procedures to be carried out and Findings to be confirmed by the Auditor
IV. The unit costs (hourly rates) are limited to salaries including during this section C and the following sections D to F.
parental leave, social security contributions, taxes and other costs included [The Auditor has drawn a random sample of 10 full-time equivalents made up of
in the remuneration required under national law and the employment employees assigned to the action(s). If fewer than 10 full-time equivalents are
contract or equivalent appointing act; assigned to the action(s), the Auditor has selected a sample of 10 full-time
V. Employees are hired directly by the Beneficiary in accordance with equivalents consisting of all employees assigned to the action(s), complemented by
national law, and work under its sole supervision and responsibility; other employees irrespective of their assignments.]. For this sample:
VI. The Beneficiary remunerates its employees in accordance with its usual the Auditor reviewed all documents relating to personnel costs such as
practices. This means that personnel costs are charged in line with the employment contracts, payslips, payroll policy (e.g. salary policy, overtime
Beneficiary’s usual payroll policy (e.g. salary policy, overtime policy, policy, variable pay policy), accounting and payroll records, applicable
variable pay) and no special conditions exist for employees assigned to national tax , labour and social security law and any other documents
tasks relating to the European Union or Euratom, unless explicitly provided corroborating the personnel costs claimed;
for in the grant agreement(s);
in particular, the Auditor reviewed the employment contracts of the
VII. The Beneficiary allocates its employees to the relevant group/category/cost employees in the sample to verify that:
centre for the purpose of the unit cost calculation in line with the usual cost
accounting practice; i. they were employed directly by the Beneficiary in accordance with
applicable national legislation;
VIII. Personnel costs are based on the payroll system and accounting system.
ii. they were working under the sole technical supervision and
IX. Any exceptional adjustments of actual personnel costs resulted from
responsibility of the latter;
relevant budgeted or estimated elements and were based on objective and
verifiable information. [Please describe the ‘budgeted or estimated iii. they were remunerated in accordance with the Beneficiary’s usual
elements’ and their relevance to personnel costs, and explain how they practices;
were reasonable and based on objective and verifiable information, present iv. they were allocated to the correct group/category/cost centre for the
your explanation to the Auditor and annex it to this certificate]. purposes of calculating the unit cost in line with the Beneficiary’s
X. Personnel costs claimed do not contain any of the following ineligible usual cost accounting practices;
costs: costs related to return on capital; debt and debt service charges; the Auditor verified that any ineligible items or any costs claimed under
provisions for future losses or debts; interest owed; doubtful debts; other costs categories or costs covered by other types of grant or by other
currency exchange losses; bank costs charged by the Beneficiary’s bank for grants financed from the European Union budget have not been taken into
transfers from the Commission/Agency; excessive or reckless expenditure; account when calculating the personnel costs;
deductible VAT or costs incurred during suspension of the implementation the Auditor numerically reconciled the total amount of personnel costs used
of the action. to calculate the unit cost with the total amount of personnel costs recorded
XI. Personnel costs were not declared under another EU or Euratom grant in the statutory accounts and the payroll system.
(including grants awarded by a Member State and financed by the EU to the extent that actual personnel costs were adjusted on the basis of
budget and grants awarded by bodies other than the Commission/Agency budgeted or estimated elements, the Auditor carefully examined those
for the purpose of implementing the EU budget). elements and checked the information source to confirm that they
correspond to objective and verifiable information;
9
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Please explain any discrepancies in the body of the Report.
Statements to be made by Beneficiary Procedures to be carried out and Findings to be confirmed by the Auditor
If additional remuneration as referred to in the grant agreement(s) is paid if additional remuneration has been claimed, the Auditor verified that the
XII. The Beneficiary is a non-profit legal entity; Beneficiary was a non-profit legal entity, that the amount was capped at
EUR 8 000 per full-time equivalent and that it was reduced proportionately
XIII. The additional remuneration is part of the beneficiary’s usual remuneration
for employees not assigned exclusively to the action(s).
practices and paid consistently whenever the relevant work or expertise is
required; the Auditor recalculated the personnel costs for the employees in the
sample.
XIV. The criteria used to calculate the additional remuneration are objective and
generally applied regardless of the source of funding; Factual finding:
XV. The additional remuneration included in the personnel costs used to 4. All the components of the remuneration that have been claimed as personnel
calculate the hourly rates for the grant agreement(s) is capped at costs are supported by underlying documentation.
EUR 8 000 per full-time equivalent (reduced proportionately if the
employee is not assigned exclusively to the action). 5. The employees in the sample were employed directly by the Beneficiary in
accordance with applicable national law and were working under its sole
supervision and responsibility.
6. Their employment contracts were in line with the Beneficiary’s usual
policy;
7. Personnel costs were duly documented and consisted solely of salaries,
[If certain statement(s) of section “C. Personnel costs” cannot be endorsed by the social security contributions (pension contributions, health insurance,
Beneficiary they should be listed here below and reported as exception by the unemployment fund contributions, etc.), taxes and other statutory costs
Auditor in the main Report of Factual Findings: included in the remuneration (holiday pay, thirteenth month’s pay, etc.);
- …] 8. The totals used to calculate the personnel unit costs are consistent with those
registered in the payroll and accounting records;
9. To the extent that actual personnel costs were adjusted on the basis of
budgeted or estimated elements, those elements were relevant for
calculating the personnel costs and correspond to objective and verifiable
information. The budgeted or estimated elements used are: — (indicate the
elements and their values).
10. Personnel costs contained no ineligible elements;
11. Specific conditions for eligibility were fulfilled when additional
remuneration was paid: a) the Beneficiary is registered in the grant
agreements as a non-profit legal entity; b) it was paid according to objective
criteria generally applied regardless of the source of funding used and c)
remuneration was capped at EUR 8 000 per full-time equivalent (or up to up
to the equivalent pro-rata amount if the person did not work on the action
full-time during the year or did not work exclusively on the action).
10
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Please explain any discrepancies in the body of the Report.
Statements to be made by Beneficiary Procedures to be carried out and Findings to be confirmed by the Auditor
D. Productive hours Procedure (same sample basis as for Section C: Personnel costs):
XVI. The number of productive hours per full-time employee applied is [delete The Auditor verified that the number of productive hours applied is in
as appropriate]: accordance with method A, B or C.
A. 1720 productive hours per year for a person working full-time The Auditor checked that the number of productive hours per full-time
(corresponding pro-rata for persons not working full time). employee is correct.
B. the total number of hours worked in the year by a person for the If method B is applied the Auditor verified i) the manner in which the total
Beneficiary number of hours worked was done and ii) that the contract specified the
C. the standard number of annual hours generally applied by the annual workable hours by inspecting all the relevant documents, national
beneficiary for its personnel in accordance with its usual cost legislation, labour agreements and contracts.
accounting practices. This number must be at least 90% of the If method C is applied the Auditor reviewed the manner in which the
standard annual workable hours. standard number of working hours per year has been calculated by
If method B is applied inspecting all the relevant documents, national legislation, labour
agreements and contracts and verified that the number of productive hours
XVII. The calculation of the total number of hours worked was done as per year used for these calculations was at least 90 % of the standard number
follows: annual workable hours of the person according to the of working hours per year.
employment contract, applicable labour agreement or national law plus Factual finding:
overtime worked minus absences (such as sick leave and special leave).
General
XVIII. ‘Annual workable hours’ are hours during which the personnel must be
12. The Beneficiary applied a number of productive hours consistent with
working, at the employer’s disposal and carrying out his/her activity or
method A, B or C detailed in the left-hand column.
duties under the employment contract, applicable collective labour
agreement or national working time legislation. 13. The number of productive hours per year per full-time employee was
accurate.
XIX. The contract (applicable collective labour agreement or national
working time legislation) do specify the working time enabling to If method B is applied
calculate the annual workable hours.
14. The number of ‘annual workable hours’, overtime and absences was
If method C is applied verifiable based on the documents provided by the Beneficiary and the
calculation of the total number of hours worked was accurate.
XX. The standard number of productive hours per year is that of a full-time
15. The contract specified the working time enabling to calculate the annual
equivalent.
workable hours.
XXI. The number of productive hours per year on which the hourly rate is based
i) corresponds to the Beneficiary’s usual accounting practices; ii) is at least If method C is applied
90 % of the standard number of workable (working) hours per year. 16. The calculation of the number of productive hours per year corresponded to
XXII. Standard workable (working) hours are hours during which personnel are at the usual costs accounting practice of the Beneficiary.
11
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Please explain any discrepancies in the body of the Report.
Statements to be made by Beneficiary Procedures to be carried out and Findings to be confirmed by the Auditor
the Beneficiary’s disposal preforming the duties described in the relevant 17. The calculation of the standard number of workable (working) hours per
employment contract, collective labour agreement or national labour year was corroborated by the documents presented by the Beneficiary.
legislation. The number of standard annual workable (working) hours that 18. The number of productive hours per year used for the calculation of the
the Beneficiary claims is supported by labour contracts, national legislation hourly rate was at least 90 % of the number of workable (working) hours per
and other documentary evidence. year.
[If certain statement(s) of section “D. Productive hours” cannot be endorsed by the
Beneficiary they should be listed here below and reported as exception by the
Auditor:
- …]
E. Hourly rates Procedure
The hourly rates are correct because: The Auditor has obtained a list of all personnel rates calculated by the
Beneficiary in accordance with the methodology used.
XXIII. Hourly rates are correctly calculated since they result from dividing annual The Auditor has obtained a list of all the relevant employees, based on
personnel costs by the productive hours of a given year and group (e.g. which the personnel rate(s) are calculated.
staff category or department or cost centre depending on the methodology
applied) and they are in line with the statements made in section C. and D. For 10 full-time equivalent employees selected at random (same sample basis as
above. Section C: Personnel costs):
The Auditor recalculated the hourly rates.
The Auditor verified that the methodology applied corresponds to the usual
accounting practices of the organisation and is applied consistently for all
[If the statement of section ‘E. Hourly rates’ cannot be endorsed by the Beneficiary activities of the organisation on the basis of objective criteria irrespective of
they should be listed here below and reported as exception by the Auditor: the source of funding.
- …] Factual finding:
19. No differences arose from the recalculation of the hourly rate for the
employees included in the sample.
F. Time recording Procedure
XXIV. Time recording is in place for all persons with no exclusive dedication to The Auditor reviewed the brief description, all relevant manuals and/or
one Horizon 2020 action. At least all hours worked in connection with the internal guidance describing the methodology used to record time.
grant agreement(s) are registered on a daily/weekly/monthly basis [delete
as appropriate] using a paper/computer-based system [delete as
The Auditor reviewed the time records of the random sample of 10 full-time
appropriate];
equivalents referred to under Section C: Personnel costs, and verified in particular:
XXV. For persons exclusively assigned to one Horizon 2020 activity the
12
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Please explain any discrepancies in the body of the Report.
Statements to be made by Beneficiary Procedures to be carried out and Findings to be confirmed by the Auditor
Beneficiary has either signed a declaration to that effect or has put that time records were available for all persons with not exclusive
arrangements in place to record their working time; assignment to the action;
XXVI. Records of time worked have been signed by the person concerned (on
that time records were available for persons working exclusively for a
paper or electronically) and approved by the action manager or line
Horizon 2020 action, or, alternatively, that a declaration signed by the
manager at least monthly;
Beneficiary was available for them certifying that they were working
XXVII. Measures are in place to prevent staff from: exclusively for a Horizon 2020 action;
i. recording the same hours twice,
that time records were signed and approved in due time and that all
ii. recording working hours during absence periods (e.g. holidays, sick minimum requirements were fulfilled;
leave),
that the persons worked for the action in the periods claimed;
iii. recording more than the number of productive hours per year used to
that no more hours were claimed than the productive hours used to calculate
calculate the hourly rates, and
the hourly personnel rates;
iv. recording hours worked outside the action period.
that internal controls were in place to prevent that time is recorded twice,
during absences for holidays or sick leave; that more hours are claimed per
XXVIII. No working time was recorded outside the action period;
person per year for Horizon 2020 actions than the number of productive
XXIX. No more hours were claimed than the productive hours used to calculate hours per year used to calculate the hourly rates; that working time is
the hourly personnel rates. recorded outside the action period;
the Auditor cross-checked the information with human-resources records to
verify consistency and to ensure that the internal controls have been
[Please provide a brief description of the time recording system in place together effective. In addition, the Auditor has verified that no more hours were
with the measures applied to ensure its reliability to the Auditor and annex it to the charged to Horizon 2020 actions per person per year than the number of
present certificate1]. productive hours per year used to calculate the hourly rates, and verified that
no time worked outside the action period was charged to the action.
Factual finding:
[If certain statement(s) of section “F. Time recording” cannot be endorsed by the
20. The brief description, manuals and/or internal guidance on time recording
Beneficiary they should be listed here below and reported as exception by the
provided by the Beneficiary were consistent with management
1
The description of the time recording system must state among others information on the content of the time records, its coverage (full or action time-recording, for all
personnel or only for personnel involved in H2020 actions), its degree of detail (whether there is a reference to the particular tasks accomplished), its form, periodicity of
the time registration and authorisation (paper or a computer-based system; on a daily, weekly or monthly basis; signed and countersigned by whom), controls applied to
prevent double-charging of time or ensure consistency with HR-records such as absences and travels as well as it information flow up to its use for the preparation of the
Financial Statements.
13
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
Please explain any discrepancies in the body of the Report.
Statements to be made by Beneficiary Procedures to be carried out and Findings to be confirmed by the Auditor
Auditor: reports/records and other documents reviewed and were generally applied
- …] by the Beneficiary to produce the financial statements.
21. For the random sample time was recorded or, in the case of employees
working exclusively for the action, either a signed declaration or time
records were available;
22. For the random sample the time records were signed by the employee and
the action manager/line manager, at least monthly.
23. Working time claimed for the action occurred in the periods claimed;
24. No more hours were claimed than the number productive hours used to
calculate the hourly personnel rates;
25. There is proof that the Beneficiary has checked that working time has not
been claimed twice, that it is consistent with absence records and the
number of productive hours per year, and that no working time has been
claimed outside the action period.
26. Working time claimed is consistent with that on record at the human-
resources department.
[official name of the [Beneficiary] [Linked Third Party]] [official name of the Auditor]
[name and title of authorised representative] [name and title of authorised representative]
[dd Month yyyy] [dd Month yyyy]
<Signature of the [Beneficiary] [Linked Third Party]> <Signature of the Auditor>
14
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements — Multi: v3.0 – 20.07.2016
ANNEX 7
MODEL FOR THE COMMITMENT ON AVAILABILITY OF FUNDS
For fields in [grey in square brackets]: enter the appropriate data
COMMITMENT ON AVAILABILITY OF FUNDS
Grant Agreement: [grant agreement number and acronym]
(To be filled out by each beneficiary and linked third party participating in the co-funded call)
The undersigned:
- declares that [name of beneficiary or linked third party] can commit and make available
national/regional contributions totalling EUR [insert amount] to fund its assigned share
of the transnational projects of the joint selection list, based on the indicated amounts of
planned funding.
SIGNATURE
For the beneficiary:
[electronic signature]
Done on [electronic time stamp]
For the linked third party:
[Name and signature] [Date and stamp]
Grant Agreement number: [insert number] [insert acronym] [insert call identifier]
Associated with document Ref. Ares(2017)5690678 - 21/11/2017
H2020 Model Grant Agreements — Multi: v3.0 – 20.07.2016
ANNEX 8
MODEL FOR THE STATEMENT ON THE USE OF THE PREVIOUS
PRE-FINANCING PAYMENT
For fields in [grey in square brackets]: enter the appropriate data
STATEMENT ON THE USE OF THE [FIRST][SECOND] PRE-FINANCING
PAYMENT
(To be filled out by the coordinator)
The undersigned:
- declares that […] % of the [first][second] pre-financing payment of EUR [insert amount]
paid for Grant Agreement [insert grant agreement reference: number, title of the action
and acronym] have been used,
- declares that this is based on substantiated data (bank slip/treasury account) provided by
each beneficiary,
- certifies that the information contained in the periodic report is full, reliable and true,
and is substantiated by adequate supporting documentation that will be produced upon
or in the context of checks, reviews, audits and investigations,
- requests a [second][third] pre-financing payment of EUR [insert amount] for [insert
grant agreement reference: number, title of the action and acronym].
SIGNATURE
For the coordinator:
[electronic signature]
Done on [electronic time stamp]
Digitally sealed by the European Commission
Date: 2017.11.21 18:00:36 CET
This document is digitally sealed. The digital sealing mechanism uniquely binds the
document to the modules of the Participant Portal of the European Commission, to the
transaction for which it was generated and ensures its integrity and authenticity.
Any attempt to modify the content will lead to a breach of the electronic seal, which can
be verified at any time by clicking on the digital seal validation symbol.
Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. +32 22991111