SertifikaatAvalik
Ametlik kinnitus
Lennuamet · 17. november 2016
- Viit
- 4.4-3/16/327-1
- Registreeritud
- 17. november 2016
- Dokumendi liik
- Sertifikaat
- Funktsioon
- 4.4 Lennuettevõtjate tegevuse korraldamine
- Sari
- 4.4-3 Ametlikud kinnitused
- Toimik
- 4.4-3/2016
- Vastutaja
- Andres Peterson (Juhtkond, Lennutegevuse osakond)
Sisu (failidest)
Lennuamet
ametlik kinnitus
approval
Ametlik kinnitus Smartlynx Eesti AOC EE-015
lennuki elektroonse tehnilise logi testprogrammile
Approvalfor Smartlynx Estonia AOC EE-015 trial program of
Electronic Technical Log
Lennuamet kinnitab Smartlynx Eesti elektroonse tehnilise logi testprogrammi, mis baseerub
riskihindamisel ja spetsiaalsel kaitamisplaanil. Testi periood on kehtiv alates 01.12.2016 kuni 01.03.2017.
Estonian CAA approves SmartLynx Electronic Technical Log (ETL) Operational trial program, based on
the risk assessment andoperational trial plan. The trialperiodis validfrom 01.12.2116 until 01.03.2017.
Program Goal
SmartLynx Airlines has selected the eTechLog8 solution from Conduce Group to be its Electronic
Technical Log platform. The eTechLog8 application is installed on Panasonic Toughpad FZ-Gl and
eliminates the paper technical log when fully adopted. The solution has all the required aircraft technical
log system functionalities and is supported by afullyfunctioning web application backend to manage all
line maintenance activitiesfor the aircraft whilst in operational service.
Objectives ofthe Operational trial
1. To make sure Electronic Technical Log System functions as it was designed including established
integration links between SmartLynx 3rdparty IT systems and reverting to the paper system in case
offailure
2. To ensure ETL system provides an acceptable level of accessibility, usability and reliability in
accordance with the applicable airworthiness and operationalrequirements
3. The ETL Risk assessment is adequate to the type ofoperations intended after the operational trial
Scope ofthe Operational Trial
1. Aircraft involved: Airbus A320 ES-SAK
2. Duration: 3 months
3. Start date ofthe trial: 01 December 2016
4. Involvedparties: group ofpilots and Part-145 engineers trainedfor thatpurpose
Trial scenarios
No connectivity with the server
2. Hardwarefailure, loss or damage
3. Softwarefailure
4. Serverfailure
5. Batteries failure
Ametlik kinnitus tunnistatakse kehtetuks, kui selguvad dokumendi kehtivust valistavad asjaolud lahtudes
Rahvusvahelise Tsiviillennunduse Organisatsiooni, Euroopa Liidu voi riigisisestest nouetest.
This approvalshall be revoked in ease of identification ofany circumstances that would exclude validity of
the approvalbased on regulations establishedby ICAO, European Union or the Republic ofEstonia.
Allkiri:
Signature:
Kaupo Toodu
Lennutegevuse osakonna juhataja Kuupaev: 16.11.2016
Head of Flight Operations Department Date:
miWUAMP/r I I " VormVA510-3/V4 Leht 1/1
L65tsa 5, 11415 Tallinn / 610 3500 / [email protected] / www.ecaa.ee
Registrikood 70000800