Konkurentsiamet · 14. veebruar 2017
Viit
7-12/17-0017-110-1
Registreeritud
14. veebruar 2017
Dokumendi liik
Sissetulev kiri
Adressaat
Litgrid AB
Saabumis/saatmisviis
e-post
Funktsioon
7 Energiavaldkond
Sari
7-12 Energiavaldkonna arengu ja varustuskindlusega seotud dokumendid
Toimik
7-12/17-0017
Vastutaja
Margus Kasepalu (Konkurentsiamet, Regulatsiooniteenistus, Energeetika- ja postiosakond)
Lahendamise tähtaeg
28. märts 2017

Failid

  • 📎170213 On Baltic hedging needs.docx31 KB
  • 📎Consultation_Latvia.pdf371 KB
  • 📎VÄLJAST Re Public Consultation_hedging opportunities within Baltic CCR.msg474 KB

Sisu (failidest)

Feb.13 th , 2017 On hedging needs/options for Baltic cross-borders. Considering the announced Public Consultation to assess the needs for cross-zonal risk hedging opportunities on the bidding zone borders within the Baltic Capacity Calculation Region (CCR), Lithuanian TSO, LITGRID would like to note that the company has made an analysis on the hedging needs/options within Baltics, and would like to ask Baltic regulators to consider summary of the findings from the analysis it has carried out based on FCA requirements. The criteria for the evaluation and answering if there is a need for the long-term transmission capacity allocation means on cross-borders is whether there is congestion on particular cross - borders. The observations of the data lead to conclusion that the congestion on Lithuania and Latvia cross-border cannot be unambiguously defined, normally shall not be anticipated and it is not frequently reoccurring under normal power system conditions. As structural congestion is not present neither in direction LT-&gt;LV, nor in direction LV-&gt;LT, in Litgrid’s view there is no requirement for obligation for LT-LV cross border hedging products to be introduced. For border s where structural congestion is present (such as EE-LV) and thus there is a need for long term electricity trade hedging, as of today a number of hedging products designated for Baltic hedging needs are available: TSOs traded EE – LV border PTR – limited, Nasdaq OMX traded EPADs (for NordPool’s EE, LV/LT, FI, SE4 etc. price areas). It should be noted that FCA does not require that the effective hedging options/products should be enabled through locally based products/platforms. The practicality of this approach is well proved by current hedging practice s , for e.g. Nasdaq’s EPAD Helsinki is actively being used by Baltic market participant for hedging Estonian area prices, or EPAD Helsinki in combination with EE-LV PTR Limited for hedging prices in Latvia, Lithuania. Thus w hen considering cross-border trade hedging options all viable options/combination of products enabling hedging of prices for particular area should be taken into account . Evaluating the above products performance (based on year 2016 data) it may be concluded that EPAD Tallinn trading activity is very low, the traded volume ratio to physical consumption is lower than 1 percent. As such i t can be stated that the market participants are not interested in an EPAD Tallinn contracts to hedge their assets. Considering EPAD Riga (as deemed to be product that shall meet both Lithuanian-Latvian market participants hedging needs) trading volumes for the various time horizon s and actual Open Interest positions in relation to combined physical consumption of Lithuania and Latvia, it can be stated that the level of activity of an EPAD Riga remains very low (less than 1 percent). In contrast EPAD Helsinki Open Interest data shows that high volume of electricity consumption being hedged using the EPAD Helsinki products: hedging volumes correspond to 20 – 30 % vs. Finnish consumption. As EPAD Helsinki product was actively traded for various time horizons and was willingly used by market participants for hedging needs, EPAD Helsinki is an example that EPAD product may be efficient hedging mean. The relative non-existence of trade in EPAD Tallinn and low activity of an EPAD Riga shall be viewed considering that NordPool’s Estonian area prices closely correlate with the Finnish price area and market participants tend to use more liquid EPAD Helsinki product for their hedging needs. In addition it should be noted that Estonian-Latvian TSOs also offer the PTR – limited product on the Estonian – Latvian border, which is essentially cost-free for market participants to purchase/sell. Hence market participants tend to use more liquid EPAD Helsinki product in combination with EE-LV PTR – limited for their hedging needs. Thus this factor diminishing demand for EPAD Riga products should be taken into account. In Table 1 it may be observed that EPAD Riga BID – ASK spread ratio to actual Bidding Zone (Riga) – SYS price difference is in line with EPAD Helsinki. However it should be noted that buyers for EPAD Helsinki on average are willing to Bid and pay the risk premium for hedging, whilst buyers of EPAD Riga on average are not interested to pay hedging risk premia, and act seeking to gain by hedging at a discount in financial market. The sellers of EPADs Riga ASK bids in par with their Finnish counterparties, however buyers EPADs in Lithuania/Latvia’s bidding zone are aiming for the discount, this leads to the comparatively high 5.10 EUR/MWh EPAD Riga BID-ASK spread compared with 0,97 EUR/MWh BID-ASK spread of an EPAD Helsinki product. Ungrounded aiming of the buyers for hedging at a discount may be one of the core reasons for low trading volumes for EPAD Riga, as normally hedging should come with some risk premia payments. Table 1: Auction data differences between EPAD Riga and EPAD Helsinki Average BID, EUR/MWh BID and actual BZ – SYS price difference EUR/MWh (% to BZ – SYS price difference) Average ASK, EUR/MWh ASK and actual BZ – SYS price difference (% to BZ – SYS price difference) Average BZ – SYS price difference, EUR/MWh Average Bidding Zone price, EUR Average SYS price, EUR EPAD Riga 9,63 -1,14 (-11 %) 14,73 3,96 (37 %) 10,77 36,99 23,72 EPAD Helsinki 6,81 1,06 (18 %) 7,78 2,03 (35 %) 5,75 31,97 Note 1: The average data are aggregated from month and two months ahead auction on NASDAQ OMX for the year 2016. The seemingly ungrounded aiming of the buyers for hedging at a discount despite as normally hedging should come with some risk premia payments may be caused by other available options , e.g. EE-LV PTR-limited rival product in case of EPAD Riga. Practice shows that in general PTR (or FTRs) offered by TSOs are traded at discount compared to actual cross-border capacity market values. This means that traders are gaining on the TSOs loss, and in general lower TSOs revenues has to be compensated by end users, whilst traders does not necessarily pass the gain to customers they supply. This may be observed e.g for the year 2016 EE-LV PTR limited trade results, as Estonian and Latvian TSOs congestion revenues loss may be estimated to be as high as 2,9 million Euros. Table 2 , below contains comparison of PTR-limited vs. EPAD products offered by Nasdaq OMX and Polish Forward electricity market. It may be observed that as in general PTR (or FTRs) offered by TSOs are also traded at discount compared to regular financial markets, this also holds true to practice with PTR-limited. Table 2: Comparison of hedging products pricing Average hedging product price, EUR Average coresponding makert price, EUR Diference, EUR Diference, % EPAD Helsinki 8,3 5,5 2,8 33% EPAD SE4 2,9 2,6 0,3 12% EPAD Riga 13,1 9,6 3,5 36% PTR-limited 2,6 3,0 -0,4 -13% F_TGE24* 38,0 37,3 0,7 2% *F_TGE24 Polish Forward Electricity Market base product Lithuanian TSO, LITGRID, based on the findings of the carried analysis on the status of hedging opportunities in Baltic-Nordic market would like suggest to focus on optimizing Baltic hedging options set up for the benefit of end users . As such LITGRID believe f ocus should be put on utilisation of forward markets (EPADs by Nasdaq OMX and Polish Electricity Forward Market , etc. ) for hedging needs on Baltic cross-borders. In order to provide effective means for hedging electricity trade on Baltic cross-borders EPAD products as currently offered by Nasdaq OMX shall be utilised in particular EPAD Helsinki/Tallinn, EPAD Riga and EPAD Malmo (SE4) and Polish Electricity Forward Market I n order to make hedging with EPAD Riga more effective substantial improvements in its performance would need to be attained. Following suggestions on improving the efficiency of EPAD Riga may be needed : Market makers role for EPAD Riga may need to be improved , however this role should be attributed to market participants. Participation in Financial Forward Markets is not a “natural” part of TSOs business, and TSO should not be counted as liquidity provider or market maker within financial markets. Discussions on the ending of PTR-limited on Estonia / Latvia border should take place, the low activity of an EPAD Riga should be taken into account considering that Estonian area price closely correlate with the Finnish price area and Estonian-Latvian TSOs also offer the PTR – limited product on the Estonian – Latvian border, which is essentially cost-free for market participants to purchase/sell. Hence market participants for their hedging needs tend to use more liquid EPAD Helsinki product in combination with EE-LV PTR – limited, which in addition as practice shows also is traded at discount. Thus for EPAD Riga product PTR-limited act as directly competing product, which is basically cost free and in addition is traded at the discount at TSOs (end users) expense. Market participants may need to adjust their market behaviour for make trading EPAD Riga product more effective : it may be observed that EPAD Riga BID – ASK spread ratio to actual Bidding Zone (Riga) – SYS price difference is in line with EPAD Helsinki. However, it should be noted that buyers for EPAD Helsinki on average are willing to Bid and pay the risk premium for hedging, whilst buyers of EPAD Riga on average are not interested to pay hedging risk premia, and act seeking to gain by hedging at a discount in financial market. Ungrounded aiming of the buyers for hedging at a discount may be one of the core reasons for low trading volumes for EPAD Riga, as normally hedging should come with some risk premia payments. Public Consultation with market participants about their needs for cross-zonal risk hedging opportunities on the bidding zone borders within the Baltic Capacity Calculation Region (CCR) The harmonised cross border markets in all timeframes will lead to a more efficient European market and benefits to customers. Forward markets have an important role in allowing parties to secure capacity and hedge positions ahead of the day-ahead timeframe. The Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline on forward capacity allocation (FCA GL) entered into force on 17 October 2016, will ensure that this can happen in the future pan-European market. The provisions of FCA GL establish a framework for the calculation and allocation of interconnection capacity, and for cross-border trading, in forward markets (i.e. timeframes longer than day-ahead). In accordance with FCA GL Article 30(2), where long-term transmission rights (LTTR) do not exist on a bidding zone border at the entry into force of FCA GL, the National Regulatory Authorities (NRAs) of the bidding zone border shall adopt coordinated decisions on the introduction of LTTR no later than 17 April, 2017, six months after the entry into force of FCA GL. In accordance with FCA GL Article 30(3), the coordinated decisions shall be based on an assessment, which shall identify whether the electricity forward market provides sufficient hedging opportunities in the concerned bidding zones. The assessment shall be carried out in a coordinated manner by the NRAs of the bidding zone border and shall include at least: a) a consultation with market participants about their needs for cross-zonal risk hedging opportunities on the concerned bidding zone borders; b) an evaluation. The evaluation shall investigate the functioning of wholesale electricity markets and shall be based on transparent criteria which include at least: a) an analysis of whether the products or combination of products offered on forward markets represent a hedge against the volatility of the day-ahead price of the concerned bidding zone. Such product or combination of products shall be considered as an appropriate hedge against the risk of change of the day-ahead price of the concerned bidding zone where there is a sufficient correlation between the day-ahead price of the concerned bidding zone and the underlying price against which the product or combination of products are settled; b) an analysis of whether the products or combination of products offered on forward markets are efficient. For this purpose, at least the following indicators shall be assessed: i) trading horizon; ii) bid-ask spread; iii) traded volumes in relation to physical consumption; Page 1 of 2 iv) open interest in relation to physical consumption. In case the assessment shows that there are insufficient hedging opportunities in one or more bidding zones, the competent NRAs shall request the relevant TSOs: a) to issue long-term transmission rights; b) to make sure that other long-term cross-zonal hedging products are made available to support the functioning of wholesale electricity markets. Within the Baltic CCR, the LTTR are implemented on Latvia (LV) and Estonia (EE) cross border interconnection (one direction, towards LV) in a form of Physical Transmission Rights (PTR–limited). Therefore, the NRAs should decide on the aforementioned introduction of LTTR for the following bidding zone borders: Latvia – Lithuania (LV-LT), Latvia – Estonia (LV-EE), direction LV-EE, and Estonia – Finland (EE-FI). To assess the market participants’ needs for cross-zonal risk hedging opportunities on Estonian and Latvian electricity bidding zone borders, the Estonian Competition Authority (ECA) and the Public Utilities Commission of Latvia (PUC) hereby invite the active traders within the Baltic electricity market to express their opinion on the cross-zonal risk hedging instruments. ECA and PUC request the active traders to answer the following questions: 1. Do you have enough hedging opportunities in the EE and LV electricity markets? a. If you have enough hedging opportunities, please explain; b. If you do not have enough hedging opportunities, please explain, what hedging products do you expect to be useful for your company; c. Do you have a need for cross-zonal risk hedging opportunities on the LV-LT, EE-FI (both directions) and LV-EE (one direction, towards EE) bidding zone borders? 2. Which products does your electricity hedging portfolio consist of? a. Share of the products used in past 3 years, including time horizon; b. Planned share of the hedging products for next two years (2017, 2018). Please give your opinion and answers to the questions not later than 13 February, 2017. The opinions and answers are welcome by post or e-mail to: Public Utilities Commission of Latvia, 45 Ūnijas Street, Riga, LV-1039, Latvia E-mail: [email protected] Or Estonian Competition Authority, Auna 6, 10317 Tallinn Estonia E-mail: [email protected] Page 2 of 2 Saatja: Andrius Šimkevičius <[email protected]> Saaja: [email protected], Konkurentsiamet, 'Renatas Pocius', Paulius Blažys Teema: [VÄLJAST] Re: Public Consultation_hedging opportunities within Baltic CCR Dear regulator colleagues, Considering the announced Public Consultation to assess the needs for cross-zonal risk hedging opportunities on the bidding zone borders within the Baltic Capacity Calculation Region (CCR), Lithuanian TSO, LITGRID would like to note that the company has recently made an analysis on the hedging needs/options within Baltics, and ask Baltic regulators to consider summary of the findings from the analysis it has carried out based on FCA requirements. Please see the attached file for the findings summary and suggestions. Pagarbiai / Best regards Andrius Šimkevičius L.e.p. Rinkos plėtros skyriaus vadovas / Acting Head of Market Development Division Litgrid AB A. Juozapavičiaus g. 13 LT-09311 Vilnius Tel. +370 5 278 2709 Mob. +370 610 07966 [email protected]<mailto:[email protected]> www.litgrid.eu<http://www.litgrid.eu/> ________________________________ Šis pranešimas skirtas tik laiško adresatui. Pranešimo ir bet kokių jo priedų turinys yra konfidenciali informacija, kurios panaudojimas ar atskleidimas gali būti ribojamas. Jeigu Jūs nesate adresatas ar gavote šį pranešimą per klaidą, neturite teisės pranešimo arba bet kokių jo priedų kopijuoti, platinti ar kitaip atskleisti kitiems asmenims. Apie gautą pranešimą prašome iš karto informuoti siuntėją, o pranešimą sunaikinti neatskleidžiant turinio. Dėkojame. This e-mail is for the exclusive use of the intended recipient. The contents of this e-mail and any attachments are confidential and may be privileged or otherwise protected from disclosure. If you are not an intended recipient or you have received this e-mail mistakenly, you are hereby notified that any disclosure, copying or distribution of this information is strictly prohibited. Please inform the sender about this e-mail and delete the document without disclosing its contents. Thank you. ________________________________