Public consultation on market participants needs for cross-zonal risk hedging opportunities
on the bidding zone borders within the Baltic Capacity Calculation Region
Dear Sirs,
With the reference to the public consultation on cross-zonal risk hedging opportunities on the
bidding zone borders within the Baltic Capacity Calculation Region we would hereby like to
extend to you the following comments.
First of all, we would like to thank you for the invitation to participate in the public consultation.
Given the integration of the Baltic electricity markets, application of implicit auctioning and rather
frequent appearance of price differences on the borders between the Baltic bidding areas, we
consider this public consultation as an important opportunity to continue exchanging the views on
cross-zonal risk hedging. Please find our response to your questions as follows.
1. Do you have enough hedging opportunities in the EE and LV electricity markets?
a. If you have enough hedging opportunities, please explain;
b. If you do not have enough hedging opportunities, please explain, what hedging
products do you expect to be useful for your company;
c. Do you have a need for cross-zonal risk hedging opportunities on the LV-LT,
EE-FI (both directions) and LV-EE (one direction, towards EE) bidding zone
borders?
1.1 According to our opinion the only liquid instruments, which enable the Estonian market
participants to cover their cross-border price risks in Latvian (and partially in Lithuanian) bidding
area, are currently the PTRs which are auctioned on Estonian-Latvian border by respective TSOs.
All the other instruments, which are offered to the market participants by various commercial
agents can provide only limited hedging opportunities and are by no means able to substitute PTRs.
The latter conclusion is mainly based on the following reasoning.
In terms of supply and demand balance of electricity, Latvia and Lithuania are both deficit areas.
The amount of competitive power generators in these countries, which could offer forward
contracts on commercial financial electricity market and thereby facilitate cross-border trading, is
very limited. Although Nasdaq OMX Commodities (NOMX) exchange has introduced in Latvia
EPADs, it does not solve the root problem, which is the very limited amount of natural electricity
forward sellers (competitive generators). Therefore, the liquidity of Latvian EPADs market and
amounts of contracts concluded with Latvian EPADs remains low. In addition to limited and
EESTI ENERGIA AS
Lelle 22, 11318 Tallinn Reg. kood 10421629
Tel 715 2222
[email protected]
Faks 715 2200 www.energia.ee
highly concentrated generation market (especially in Latvia), functioning of the financial
electricity market is also hampered by exploited trading practices. It seems that the largest
producers and importers in Latvia and Lithuania prefer to sell their electricity directly to the end-
consumers rather than to wholesale forward market.
Given the above circumstances and a fact that Eesti Energia basically does not possess generation
assets in Latvia and Lithuania, the PTRs auctioned on Estonian-Latvian border remain for us and
in fact for every Estonia-based supplier, the most important risk hedging instruments while
conducting cross-border trade to Latvia and Lithuania. These instruments enable us to mitigate
cross-border price risk in meaningful amounts, to offer competitively priced fixed price contracts
to Latvian and Lithuanian customers, and thereby enhance the competition and choices of
customers in the regional power market.
1.2 As regards the proceedings of auctioning of PTRs on Estonian-Latvian border then in general
we are satisfied with the performance of the respective TSOs. Nevertheless, in the past we have
repeatedly expressed our concern that in some cases the volumes of Monthly Auctions have been
reduced too easily as the actual transmission capacities have exceeded not only the reduced
auctioning volumes of PTRs but also initially defined volumes of PTR auctioning. As monthly
PTR poses the last hedging opportunity for market participants, it’s important to ensure that
auction volumes are not reduced too easily. Therefore, the market regulators of Estonia and Latvia
could observe the auctioning volumes of PTRs and analyse whether reductions of auctioning
volumes are duly justified.
1.3 The commissioning of NordBalt submarine cable between Lithuania and Sweden has changed
the risk profile of cross-border trading between Latvia and Lithuania. If previously Latvia and
Lithuania were basically part of the same price zone, then after commissioning of NordBalt cable
price differences between Latvian and Lithuanian bidding areas have emerged. Although the price
differences are not high on average, there is always an event risk of larger price differences as
generation capacities in Lithuania are rather scarce. Therefore, we suggest to the regulatory
authorities of the Baltic countries to consider introduction of yearly, quarterly and monthly PTRs
also on Latvian-Lithuanian border. Because of the reasons described in section 1.1., we do not
consider the introduction of EPADs in Lithuania as a promising opportunity for risk hedging. As
far as the appetite of market participants for Latvia-Lithuania PTRs is only about to form, we
suggest to consider auctioning of lower volumes as a first step.
1.4 As regards the Estonian price area, we are mostly interested in hedging our production assets.
Unfortunately, we find the buy side of commercial financial electricity market for Estonian
forwards in NOMX exchange and in the over the counter market insufficient. Poor liquidity of
Tallinn EPADs is mostly based on the following reasoning:
1) consumers do not have access to NOMX financial market;
2) initial margins in NOMX exchange for Baltic EPADs are unreasonably high, resulting in
substantial collateral requirements;
3) some market participants with natural buying interest may be willing to keep Finland-Estonia
cross-border risk open as Estonia and Finland are coupled most of the time and use Finnish
forwards for hedging instead.
Due to the latter reason, we also do not see any particular value in the introduction of Estonia-
Finland PTRs as price differences are small and there is (at least currently) sufficient offer for
Estonian forwards from local producers.
1.5 For conclusion. In order to facilitate hedging of cross-border price risks NOMX exchange has
introduced EPAD products both in Estonia and Latvia. Unfortunately, the practice has
demonstrated that due to local circumstances these products are neither liquid nor able to provide
meaningful price hedging. Therefore, Estonian-Latvian PTRs remain as the most important cross-
border price risk mitigation instruments. Given the strong demand for acquiring these instruments
the regulatory authorities could analyze possible means for increasing (or at least not reducing)
the auctioning volumes of Estonian-Latvian PTRs.
Taking into account the commissioning of NordBalt submarine cable, the risk profile of Latvia-
Lithuania cross-border trade has changed. Therefore, due to limited power generation capacities
in Lithuania we suggest to start issuing PTRs also on Latvian-Lithuanian border. Introduction of
Estonian-Finland PTR is not required as there is sufficient offer side from Estonian local producers
that enables hedging without PTRs. We would nevertheless also propose to the Baltic regulatory
authorities to support the introduction of Lithuanian-Sweden PTRs, which would enable tighter
integration of Lithuanian bidding area with southern part of Sweden.
2. Which products does your electricity hedging portfolio consist of?
a. Share of the products used in past 3 years, including time horizon;
b. Planned share of the hedging products for next two years (2017, 2018).
We mostly hedge our production assets by 1) selling fixed price contracts to the end-consumers in
the Baltic countries; 2) hedging with mostly System price and Helsinki EPAD contracts in NOMX
exchange; and 3) to some extent selling Estonian forwards over the counter and in the NOMX
exchange. If we sell power to Latvian and Lithuanian end-consumers, then cross-border risk is
mitigated using Latvia-Estonia PTRs. In the next few years we plan to continue as we have done
in the past. However, if new and relevant cross-border hedging opportunities should emerge then
we will incorporate them into our trading practices. For example, introduction of Lithuania-Latvia
PTR would certainly help us to hedge Lithuanian sales price risk more efficiently.
Kind Regards,
/signed digitally/
Andres Sutt
Director of Group Regulatory Affairs
Eesti Energia AS
Saatja: Andres Sutt <
[email protected]>
Saaja: Konkurentsiamet, Marilin Tilkson, Keteliina Toom, Maris Saluri, Andres Tropp
Teema: [VÄLJAST] Avalik konsultatsioon seoses riskimaandamise vajadusega pakkumispiirkonnas - Eesti Energia seisukohad
Tere,
Täname võimaluse eest konsultatsioonil osaleda ning edastame siinkohal Eesti Energia seisukohad.
Lugupidamisega,
Andres Sutt
regulaatorsuhete direktor
Eesti Energia AS
Lelle 22, 11318 Tallinn, Harjumaa
Tel: 5043402
e-post:
[email protected]<mailto:
[email protected]>
www.energia.ee<http://www.energia.ee>
[Eesti]