ESTONIA-RUSSIA CROSS-BORDER COOPERATION PROGRAMME
PROGRAMMING PERIOD 2014–2020
AUDIT STRATEGY
As prepared by:
AUDIT AUTHORITY
WITH THE SUPPORT OF THE GROUP OF AUDITORS
As in:
14th of February 2020
LIST OF ABBREVIATIONS
AA Audit Authority
AAR Annual Audit Report
AO Audit Opinion
AoA Audit of Accounts
AoO Audit of Operations
AS Audit Strategy
BO Branch Office
CA Certifying Authority
EC European Commission
eMS Electronic Monitoring System
ENI European Neighborhood Instrument
FCD Financial Control Department
GoA Group of Auditors
IIA Institute on Internal Auditors
JTS Joint Technical Secretariat
MA Managing Authority
MCS Management and Control Systems
MCSA Management and Control Systems Audits
RoP Rules of Procedures
PREAMBLE
The Audit Strategy (hereinafter as the AS) for the of Cross-Border Cooperation Programme
“Estonia-Russia”1 2014-2020 (hereinafter as the Programme) is a planning document
developed by the Audit Authority of the Programme (hereinafter as the AA) with the support
of the Group of Auditors (hereinafter the GoA) for setting out the audit methodology, the
sampling method, and the audit plan to verify and issue an opinion about whether the
management and control systems of the Joint Operational Programme function effectively,
and to verify the expenditure that has been declared; and for the coordination of all audit
activities that are related to the Programme.
The AS sets out the details for the following aspects of audit work as they are used in the
Programme:
The planning of audits for the current and the two subsequent accounting years;
The methodology for system audits, audits of operations and audits of accounts;
The sampling method for audits of operations.
The AS and its preparation, adoption and submission to the European Commission, the
Ministry of Finance of Russian Federation and the Ministry of Finance of the Republic of
Estonia is under the sole responsibility of the AA. In this task, the AA is assisted by the GoA.
1
Also may be referred to hereinafter as „Russia-Estonia“
INTRODUCTION
The AS has been prepared for the Programme that is co-financed by the European Union under
the European Neighborhood Instrument (ENI), the Republic of Estonia and the Russian
Federation. The AS will cover all the funds allocated to the Programme for the minimum of
current accounting year and the two subsequent accounting years, with the possibility of
updating it annually with the agreement of the GoA.
The AA of the Programme has been established by the Agreement on financing and
implementation of Cross-Border Cooperation Programme “Estonia-Russia” 2014-2020, signed
in December 2016 between the European Commission, Government of the Russian Federation
and the Republic of Estonia. The Agreement was ratified by all parties and entered into force
on the 1st of January 2019. For the legislation of the Republic of Estonia, the AA has been
established in the 2014-2020 Structural Assistance Act. The AA holds the responsibility for
drawing up, monitoring and updating the AS. In this task, the AA is assisted by the GoA.
The rights and responsibilities of the AA and the GoA are regulated on the basis of the Rules
of Procedures (hereinafter as the RoP) of the GoA, first adopted on the 28th of July 2017, and
will apply to all instances of consulting, comments and proposals described in the AS.
The AA functions are fulfilled by the Head of the Financial Control Department of the Ministry
of Finance (hereinafter as the FCD) of the Republic of Estonia. The Member of the GoA
representing the Republic of Estonia is the Head of Audit Unit II of the FCD of the Ministry of
Finance of the Republic of Estonia. The Member of the GoA representing the Russian
Federation is the Director of the Department for International Financial Affairs of the Ministry
of Finance of the Russian Federation.
INDEPENDENCE
The AA is situated in the Ministry of Finance of the Republic of Estonia and is functionally
independent from the national competent bodies and from the other Programme bodies. This
principle must also apply to any Programme audit work that is outsourced.
In the context of the Programme:
- the Ministry of Finance of the Republic of Estonia hosts the following Programme
bodies: The European Territorial Cooperation Unit hosts the National Authority. The
AA is functionally independent from it.
- The State Shared Service Centre of Estonia hosts the following Programme bodies:
Cross-Border Co-Operation Programmes Management Unit of the Grants
Development Department hosts the Managing Authority, the Interreg Projects
Supervision Unit hosts the Financial Control and the Tartu branch hosts the Joint
Technical Secretariat. The AA is functionally independent from all of them.
The individual auditors carrying out the outsourced Programme audit work will also assess
and state their independence in the context of the specific audit work. This also applies to any
Programme audit work done by the Members of the GoA. The independence of any individual
auditors will be described and detailed in a declaration of independence, signed for each audit
assignment
RISK ASSESSMENT
The MA is responsible for the overall risk assessment of the Programme. This process uses the
EC guidance as a basis, where it does not contravene to the legislation of either the Russian
Federation or the Republic of Estonia.
The AA is responsible for conducting the risk assessment that will serve as a basis for the
annual working plan of system audits.
The risk assessment incorporates all bodies of the Programme, applies relevant risk factors to
them and classifies all bodies by their risk level. The risk assessment is done at the end of each
calendar year, before the compiling of the Annual Audit Report (hereinafter as the AAR).
This risk assessment system will incorporate the work of the Members of GoA of both Estonia
and Russia, as agreed in the GoA RoP.
METHODOLOGY
The AA will produce a manual for carrying out the Audits of Operation (hereinafter as the
AoO). The GoA will add their comments and proposals during the preparation of the manual,
as agreed in the RoP. The manual will be prepared for the second quarter of the year 2019.
For carrying out the Management and Control System Audits (hereinafter as the MCSA), the
AA will not produce a separate manual. This will be compensated by a thorough planning stage
for each of the MCSA-s.
The AA and the Members of the GoA follow the International Standards for the Professional
Practice of Internal Auditing, Definition of Internal Auditing and the Code of Ethics issued by
the Institute of Internal Auditors (hereinafter as the IIA). The Member of the GoA in Russia
ensures that the Programme audit work complies with internationally accepted auditing
standards.
The AA shall pay attention to the quality assessment of all audit work done for the Programme.
All work done by the AA shall have four-eye principle applied to it and any outsourced work
shall have quality control applied to by the AA. The Financial Control Department has been
externally evaluated and found in compliance with the IIA Standards.
The AAR and Audit Opinion (hereinafter as the AO) will be compiled by the AA, whose sole
responsibility it is. The GoA will, however, also provide comments and proposals, as agreed in
the RoP.
The AAR and the AO will be presented to the Parties as well as the European Commission
(hereinafter as the EC) annually no later than the 15th of February. They each will cover the
period between 01/07/N-1 and 30/06/N.
AUDITS ON THE FUNCTIONING OF MCS
The AA has decided that in order to obtain an assurance and express an opinion on the
functioning of the Programme, each of the bodies and functions of the Programme needs to
be audited at least once during the lifetime of the Programme, by using all of the necessary
key requirements.
Based on the risk assessment, the bodies of the Programme or the functions audited
separately from the bodies (excluding the AA and the GoA) are the following:
The MA, along with the functions of the Certifying Authority (hereinafter as the CA);
Joint Technical Secretariat (hereinafter as the JTS);
Branch Offices (hereinafter as the BO-s) in Russia: St. Petersburg and Pskov;
The CCP-s in Estonia and Russia.
The bodies of the Programme that will not be audited separately but only as parts of the
processes of the Programme are Joint Monitoring Committee and the National Authorities.
Based on the risk assessment, the AA will also audit specific processes of the Programme that
may involve one or several of the Programme bodies, including:
The computerized system of the Programme (hereinafter as the eMS);
Project selection of the Programme;
Expenditure verification of the Programme;
Anti-fraud measures of the Programme.
The MCSA-s will be carried out by the MoGoA of Estonia and consulted on by the MoGoA of
Russia, as agreed in the RoP.
AUDITS OF OPERATIONS
The AA shall carry out a necessary amount of the AO-s annually in order to obtain an assurance
and express an opinion on the amounts declared by the MA to the Parties as well as the EC.
As the AA foresees a low amount of projects to be audited each year, the AA shall use a non-
statistical approach in order to arrive to a representative sample and to present the
extrapolated findings.
To ensure both the randomness and the necessary coverage of the sample, the AA shall use a
simple random sampling for its non-statistical approach. However, any sample drawn using
this method must have a coverage of at least 10% of the monetary amount of the population
and at least 5% of the population units. The results obtained from this sample will also be
mathematically extrapolated to the population.
The AA considers the Technical Assistance expenditure in the Programme as equal to other
projects and will thus include it in the sampling of the PA-s. In order to avoid the conflict of
interests, all audit work on the sampled Technical Assistance expenditure will be outsourced.
The PA-s in Estonia will be carried out by the Member of the GoA in Estonia. The PA-s in Russia
will be outsourced by the AA. Specific attention shall be paid to quality control of the
outsourced PA-s. The process will be consulted on by the Member of the GoA in Russia, as
agreed in the RoP.
AUDITS OF THE ACCOUNTS
In order to provide an opinion on the annual accounts, the AA takes account of the MSCA-s,
the PA-s, and any checks by the other Programme bodies, as well as any other relevant audits.
In addition, the AA carries out the Audit of Accounts (hereinafter as the AoA) when the
Programme accounts are presented by the CA to the AA by the end of each year. This work
includes the following aspects:
Reconciliation of the total amount of expenditure;
Reconciliation of the amounts withdrawn and recovered;
Reconciliation of the amounts excluded due to ongoing assessments.
The GoA shall provide comments and consultation to this work, as agreed in the RoP.
VERIFICATION OF THE MANAGEMENT DECLARATION
Annually in January after verification of accounts, the AA shall review the Management
Declaration compiled by the MA to verify the assertions made in it.
AUDIT WORK PLANNED IN THE NEAR FUTURE
The AA conducts the planning of audits in line with the risk assessment as described before.
For 2020, the financial amounts used by projects will be declared by the MA, which means
that both AO-s and the outsourcing of AO-s shall be planned for 2020.
For 2020, the AA shall also plan to conduct the AoA.
For 2020, the AA has planned to conduct at least the following MCSA-s:
The Programme function: Declaring the financial amounts (including the MA).
The Programme function: Expenditure verification (including the MA).
For 2021, the AA will be planning the following MCSA work:
The Programme function: Recording the Programme indicators and using the results
in practice (including the JTS).
RESOURCES
For the Programme work, the AA shall draw on the resources provided by the Republic of
Estonia. The AA is situated in the Department of Financial Control, having twelve auditors and
lead auditors working for the department. This allows it to draw on additional resources in
times of need.
In addition to that, the AA has been provided with the resources by the Programme to
outsource audit work done in Russia. This process will be carried out in accordance with the
Public Procurement Act of Estonia and will be initiated, executed and controlled by the AA. In
this process, the GoA shall provide comments and proposals, as agreed in the RoP.
APPROVING THE AUDIT STRATEGY
The strategy is compiled by the AA. Before approving the AA, the GoA shall provide comments
and proposals, as agreed in the RoP.
The AA shall review and update the strategy annually from 2017 until the end of 2024, if
needed, always with the assistance of the GoA.
Estonia-Russia CBC Programme 2014-2020
Audit of Financial Control function
Audit No JKS-39/2020
Final Report
29.06.2021
Prepared by the Audit Authority of Estonia-Russia Programme
Audit of management and control systems – Final Report
Audit final report recipients:
Ms. Imbi Uusjärv, Head of the Financial Control function
Ms. Ege Ello, Head of the Managing Authority
Ms. Unda Ozolina, Head of the Joint Technical Secretariat
EXECUTIVE SUMMARY
The purpose of this audit was to assess the effectiveness of the management and control systems of Estonia-Russia
CBC Programme 2014-2020 in administrating the Financial Control function of the Programme.
The assessment was carried out based on the following:
• Key requirement 1: Adequate separation of functions and adequate systems for reporting and monitoring
where the responsible authority entrusts execution of tasks to another body.
• Key requirement 3: Adequate information to beneficiaries.
• Key requirement 4: Adequate management verifications.
• Key requirement 5: Effective system in place to ensure that all documents regarding expenditure and audits
are held to ensure an adequate audit trail.
• Key requirement 6: Reliable system for collecting, recording and storing data for monitoring, evaluation,
financial management, verification and audit purposes, including links with electronic data exchange
systems with beneficiaries.
• Key requirement 7: Effective implementation of proportionate anti-fraud measures.
By compiling the audit opinion, the auditors considered the evidence gathered and conclusions made during the
audit work.
SUMMARY OF THE AUDIT RESULTS
As the result of this audit, the Audit Authority is in opinion that the management and control systems of the
Estonia-Russia Programme in respect of the Key requirements 1, 3, 4, 5, 6 and 7 works, but some improvements
are needed (Category 21).
The detailed results by assessment criteria are presented in Part B of this report and the summary table of
results in Annex 1.
During the audit, the following significant2 findings were made:
Finding No 4.1 - The general four-eye principle in relation to the Financial Control function in Russian Federation
is not assured in practice (Significant)
Finding No 4.2 - The control of the Managing Authority in relation to the Financial Control function is not well
defined in procedure and practice (Significant)
1 Category 1 – Works well. No or only minor improvements needed
Category 2 - Works, but some improvements are needed
Category 3 – Works partially; substantial improvements are needed
Category 4 – Essentially does not work.
2 Significant findings are findings that describe an error in the auditee’s management and control systems which has a significant effect on
the possibility of fulfilling its critical tasks and requirements (this may include systemic errors). Significant findings require immediate action
from the auditee’s management in order to correct those errors.
Non-significant findings are findings that describe an error in the auditee’s management and control systems which has a non-significant
effect on the possibility of fulfilling its critical tasks and requirements (this may include random errors). Non-significant findings require action
from the auditee’s management in order to correct those errors.
2
Audit of management and control systems – Final Report
Finding No 4.3 - The division of horizontal control topics between the Financial Control function and the Joint
Technical Secretariat should be clarified (Significant)
The auditors assume that the information presented to them during the audit including both in written and verbal
form describe the management and control systems of the Estonia-Russia Programme correctly and in accordance
with its actuality. Should there exist information that was not known or not presented to the auditors at the time, the
results and the opinion may have been different.
The audit has been carried out in accordance with internationally accepted internal auditing standards of the IIA –
International Standards for the Professional Practice of Internal Auditing.
The final audit report will be published at the homepage of the Ministry of Finance of the Republic of Estonia.
The audit team wishes to thank the employees of the Estonia-Russia Programme for their cooperation and
assistance during the audit work.
Final Report consists of 12 pages and an annex.
Audit supervisor: Audit manager:
(Signed electronically) (Signed electronically)
Kadi Peets Mart Pechter
Head of Audit Unit II Advisor
Financial Control Department Financial Control Department
3
Audit of management and control systems – Final Report
TABLE OF CONTENTS
EXECUTIVE SUMMARY .......................................................................................................................................... 2
TABLE OF CONTENTS ............................................................................................................................................ 4
PART A .................................................................................................................................................................. 5
1. SUMMARY OF THE AUDIT WORK ................................................................................................................ 5
2. SAMPLING METHODOLOGY ...................................................................................................................... 5
3. BACKGROUND INFORMATION.................................................................................................................... 6
4. FOLLOW-UP AND MONITORING ................................................................................................................. 6
PART B .................................................................................................................................................................. 7
FINDINGS AND RECOMMENDATIONS ..................................................................................................... 7
Finding No 1.1 - The Description of management and control system should be updated (Non-significant) ........ 7
Finding No 4.1 - The general four-eye principle in relation to the Financial Control function in Russian Federation
is not assured in practice (Significant) .................................................................................................................. 8
Finding No 4.2 - The control of the Managing Authority in relation to the Financial Control function is not well
defined in procedure and practice (Significant) ..................................................................................................... 9
Finding No 4.3 - The division of horizontal control topics between the Financial Control function and the Joint
Technical Secretariat should be clarified (Significant) ........................................................................................ 10
Finding No 4.4 - The principles of commenting on the Financial Control function checklist should be clarified
(Non-significant).................................................................................................................................................. 11
Finding No 6.1 - The checklists of the Joint Technical Secretariat should be added to the section “Attachments
JTS” under the Project Progress Report section in the eMS system (Non-significant) ....... Tõrge! Järjehoidjat pole
määratletud.
ANNEX 1 – SUMMARY OPINION OF THE AUDITEE’S MANAGEMENT AND CONTROL SYSTEMS .................................... 13
4
Audit of management and control systems – Final Report
PART A
1. Summary of the audit work
In accordance with the Agreement on financing and implementation of Cross-Border Cooperation Programme
“Estonia-Russia” 2014-2020 and the working plan of the Audit Authority for the year 2020, the Audit Authority carried
out an audit on the management and control systems of Estonia-Russia Programme in administrating the Financial
Control function of the Programme, as used for the programming period of 2014-2020. The purpose of the audit was
to give an independent opinion on the functioning and effectiveness of the management and control systems in that
regard.
The audit was carried out between 17/07/2020 and 29/06/2021. The audit was managed, and the audit procedures
carried out by an Advisor of the Financial Control Department of the Ministry of Finance of Estonia, Mart Pechter.
The audit supervisor was the Head of Audit Unit II of the Financial Control Department, Kadi Peets.
To present an opinion, the management and control systems of Estonia-Russia Programme with regards to Financial
Control function were analyzed and tested in accordance with the Key requirements 1, 3, 4, 5, 6 and 7.
The audit was based on the following documents:
- Joint Operational Programme document of Estonia-Russia Programme.
- Description of the management and control systems of the Estonia-Russia Programme.
- Methodologies and specific documents related to those documents developed and used by the Financial Control
function and the Joint Technical Secretariat, such as the forms, checklists and guiding materials.
- Selected partner report forms and the checklists and decisions pertaining to those forms.
To form an opinion, the following audit procedures were carried out:
- The evaluation of compliance of the Financial Control function set out in the documents of Estonia-Russia
Programme in comparison with the Key requirements 1, 3, 4, 5, 6 and 7.
- Testing in the practice of the Estonia-Russia Programme in the Financial Control function by selecting several
partner report forms and the checklists and decisions for observation of the practice.
- Conducting interviews with a controller of the Financial Control function, the Head of the Managing Authority,
the Head of the Joint Technical Secretariat and the Head of the Financial Control function, among others.
The audit work was based on the methodology developed by the Financial Control Department for the period of 2014-
2020.
2. Sampling methodology
To test for the practice, different partner report forms were selected for testing as follows:
- The selection was made from partner report forms entered to the eMs system of Estonia-Russia Programme.
The selection was made randomly; with a few provisions as follows:
o Selections were made from different objectives of the Programme, with two projects selected randomly
from the TO1, two from the TO5 and one from the TO6.
o The selection also included a variety of projects: one Large Infrastructure Project, two from the 1st Open
Call, one from the 2nd Open Call and one from the 3rd Open Call.
- The random selection was stopped after selecting those five random items from the population. The auditor
believed these items provide sufficient coverage and variety with regards to the population.
5
Audit of management and control systems – Final Report
- Out of those five random projects, ten random partners were selected for testing, with the provision that for
every project, one Estonian partner and one Russian partner should be selected.
In total, as mentioned before, five unique projects were appraised, which means that 10 partners in total were tested,
regarding the checklists filled and final decisions made.
The auditor again considers this sample to be sufficient for the purposes of this audit.
3. Background information
In accordance with Agreement on financing and implementation of Cross-Border Cooperation Programme “Estonia-
Russia” 2014-2020, the Audit Authority ensures that audits are carried out on the management and control systems
of the Estonia-Russia Programme.
The audit of the Financial Control function was added to the working plan of the Audit Authority because as per the
risk assessment, it was deemed to be one of the more critical functions of the Estonia-Russia Programme and thus
one of the firsts that should be audited.
4. Follow-up and monitoring
The auditee must take into consideration all the findings and recommendations presented in the Part B of this report.
The Managing Authority is responsible for the follow-up and monitoring of the implementation of measures taken as
a result and will report of the results in a written form. The final opinion on the implementation of measures will be
given by the Audit Authority. If necessary, a follow-up audit may be conducted.
6
Audit of management and control systems – Final Report
PART B
FINDINGS AND RECOMMENDATIONS3
Key requirement 1: Adequate separation of functions and adequate systems for reporting and
monitoring where the responsible authority entrusts execution of tasks to another body
As the result of this audit, the auditor finds that the management and control system of the Estonia-Russia
Programme of this function regarded via the Key Requirement 1 works well. Only minor improvements needed
(Category 1) 4
Finding No 1.1 - The Description of management and control system should be updated (Non-
significant)
The TESIM project has published a working paper adaption on the Methodology for assessing management and
control systems, published by the European Commission, detailing the key requirements and assessment criteria for
the management and control system audits.
In accordance with the Key requirement 1.1, there should be a clear description and allocation of functions.
The auditor finds that some minor information in the Description of management and control systems should be
updated to better reflect the practice of the Programme. For instance, the following updates should be useful:
• Updating the chart of Control Contact Point in Republic of Estonia by noting the full- or part-time
employment of both the CCP and the public officers.
• Clearly state that the four-eye principle on the work of the Financial Control function is carried out by the
Control Contact Point in Republic of Estonia and contracted out in Russian Federation.
• Update the chart of the examination and verification process by including the four-eye principle in the
process.
• Update that the Financial Control check has been decided to now take 40 days instead of 60.
• Update the information of Control Contact Point in Russian Federation by clarifying the tasks that are
carried out in practice.
RISK: The auditor points out that although minor, the risk of leaving the points not clarified may affect the confidence
in the description and function of the system.
RECOMMENDATION No 1.1 TO THE MANAGING AUTHORITY: The auditor recommends updating the Description of
management and control systems with the necessary information.
COMMENT FROM THE MANAGING AUTHORITY
The Managing Authority has already updated the Description of Management and Control Systems, some additional
updates according to the Auditor’s recommendations will be made. The Managing Authority will carry out a written
procedure of the Joint Monitoring Committee for approval of the updated document from 1 July to 22 July 2021.
FINAL COMMENT FROM THE AUDITOR
3 Audit findings are listed according to the assessment criteria of the management and control systems assessment methodology
4 Category 1 – Works well. No or only minor improvements needed
Category 2 - Works, but some improvements are needed
Category 3 – Works partially; substantial improvements are needed
Category 4 – Essentially does not work.
7
Audit of management and control systems – Final Report
The auditor accepts the comments and considers this finding closed.
Key requirement 3: Adequate information to beneficiaries
As the result of this audit, the auditor finds that the management and control system of the Estonia-Russia
Programme of this function regarded via the Key Requirement 3 works well. No improvements needed (Category 1)
5
No findings.
Key requirement 4: Adequate management verifications
As the result of this audit, the auditor finds that the management and control system of the Estonia-Russia
Programme of this function regarded via the Key Requirement 4 works, but some improvements are needed
(Category 2)
Finding No 4.1 - The general four-eye principle in relation to the Financial Control function in Russian
Federation is not assured in practice (Significant)
The TESIM project has published a working paper adaption on the Methodology for assessing management and
control systems, published by the European Commission, detailing the key requirements and assessment criteria for
the management and control system audits.
The Key requirement 4.1 (a), administrative verifications in respect of each application for reimbursement by
beneficiaries, states that all applications for reimbursement submitted by beneficiaries should be subject to
administrative verifications by the Managing Authority before certification.
As set out in the Description of management and control systems, the Financial Control function is carried out by
public officers in Republic of Estonia and contracted auditors in Russian Federation. In Estonian side, the Control
Contact Point checks the public officers’ work on sample basis. In Russian side, an auditor is contracted to check
the work of auditors. The findings from this level of control are presented to the Managing Authority for decisions.
However, the auditor notes that this additional contracting has not yet been carried out, although the verifications by
the contracted auditors have been and are being carried out. This means that the so-called four-eye principle is not
currently functional. The Managing Authority has stated that this situation will be amended as soon as possible.
RISK: The auditor points out that there is no other function carrying out checks on the work of the Financial Control
function. The checks of Joint Technical Secretariat and Certifying Authority function, although necessary, have other
purposes of their own. Therefore, any errors on the Financial Control function level in Russian Federation (either
random or systemic) have a risk of not getting noticed.
RECOMMENDATION No 4.1 TO THE MANAGING AUTHORITY: The auditor recommends carrying out the contracting
process to ensure the function of the so-called four-eye principle in Russian Federation as soon as possible. The
auditor also notes that to use outsourced resources more efficiently, this function need not be continuous as in
5 Category 1 – Works well. No or only minor improvements needed
Category 2 - Works, but some improvements are needed
Category 3 – Works partially; substantial improvements are needed
Category 4 – Essentially does not work.
8
Audit of management and control systems – Final Report
Republic of Estonia but can be periodic instead. This merely needs to be carried out before the Certifying Authority
function.
COMMENT FROM THE MANAGING AUTHORITY
The Managing Authority and the Joint Technical Secretariat will launch a tender for contracting of sample-based
check of the work of contracted auditors in the Russian Federation to ensure the so-called four-eye principle during
the 2nd half of 2021.
FINAL COMMENT FROM THE AUDITOR
The auditor accepts the comments and will follow up on this finding by the time the proposed plan has been carried
out.
Finding No 4.2 - The control of the Managing Authority in relation to the Financial Control function
is not well defined in procedure and practice (Significant)
The TESIM project has published a working paper adaption on the Methodology for assessing management and
control systems, published by the European Commission, detailing the key requirements and assessment criteria for
the management and control system audits.
The Key requirement 4.1 (a), administrative verifications in respect of each application for reimbursement by
beneficiaries, states that all applications for reimbursement submitted by beneficiaries should be subject to
administrative verifications by the Managing Authority before certification.
As set out in the Description of management and control systems, the Managing Authority has a control function in
relation to the Financial Control function. When the partners’ reports have passed the Financial Control function and
the consolidated report is prepared and checked by the Joint Technical Secretariat, the Managing Authority will check
the results in turn, using a checklist developed for that purpose.
However, the auditor notes that the Managing Authority does not carry out this control quite as written, nor has there
been a checklist developed for that. Instead, as the Managing Authority states, its control function is carried out as
based on risk evaluation (dependent on the information from the Financial Control and Joint Technical Secretariat).
Any items with no specific risk attached are not checked.
RISK: The auditor points out that there is a small but significant difference on how this control is described and how
it is carried out in practice. If there is no random element in the control, it is apparent that this check will be carried
out only on narrow selection of items. There is a risk that the current description gives misleading information about
the nature of this control.
Still, the auditor concedes that the risk is not inherent to the practice as such, only to the difference between
description and practice.
RECOMMENDATION No 4.2 TO THE MANAGING AUTHORITY: The auditor recommends updating the description of
the procedure to match that of the practice. The auditor also recommends updating the procedures whenever
something more suitable to the function is found in practice.
COMMENT FROM THE MANAGING AUTHORITY
The Managing Authority has updated the Description of Management and Control Systems already and will carry out
a written procedure of the Joint Monitoring Committee for approval of the updated document from 1 July to 22 July
2021. The Managing Authority will follow the recommendation of the Auditor on updating the procedures whenever
something more suitable to the function is found in practice.
FINAL COMMENT FROM THE AUDITOR
The auditor accepts the comments and will follow up on this finding by the time the proposed plan has been carried
out.
9
Audit of management and control systems – Final Report
Finding No 4.3 - The division of horizontal control topics between the Financial Control function and
the Joint Technical Secretariat should be clarified (Significant)
The TESIM project has published a working paper adaption on the Methodology for assessing management and
control systems, published by the European Commission, detailing the key requirements and assessment criteria for
the management and control system audits.
The Key requirement 4.3 states that written procedures and comprehensive checklists should exist to be used and
should, as a minimum, address verifications on:
e. compliance with the relevant rules on environment, sustainable development, equal opportunity requirements and
non-discrimination.
f. the reality of the project, including the output and result indicators.
Currently, there is a division of checks between the Financial Control function and the Joint Technical Secretariat,
with different points of focus. The Financial Control function focuses on eligibility of specific costs and the Joint
Technical Secretariat on horizontal topics.
The auditor notes that the checklist of the Joint Technical Secretariat does not include a control question for the
horizontal topics: environment, sustainable development, equal opportunity requirements and non-discrimination.
The checklist also does not have a separate control question for the indicators.
The auditor concedes that in practice, both the Financial Control function and the Joint Technical Secretariat have
agreed on the division of the topics and are aware of what the extent of the checks for both are.
RISK: The auditor points out that although a current division of tasks is reasonable in theory, the risk is that some
topics will not end up covered if the division is not clear enough.
RECOMMENDATION No 4.3 TO THE JOINT TECHNICAL SECRETARIAT: The auditor recommends updating the
checklists of the Joint Technical Secretariat, by adding control questions about the environment, sustainable
development, equal opportunity requirements, non-discrimination and indicators.
COMMENT FROM THE JOINT TECHNICAL SECRETARIAT
The Joint Technical Secretariat would like to add an explanation that horizontal principles such as sustainable
development (environment), equal opportunity requirements, non-discrimination and HIV prevention are
incorporated in the application by default and automatically appear as a mandatory section in each progress report.
The JTS verifies the completion of the report for every section regardless of whether it is separated in the checklist
or not.
In future the checklists of the Joint Technical Secretariat will be elaborated and questions about the environment,
sustainable development, equal opportunity requirements, non-discrimination and indicators will be added. It is
planned to be carried out in July of 2021.
In addition, after interview with Audit Authority during the audit, the question of environment, sustainable
development, equal opportunity requirements and non-discrimination also was asked in some on-spot visits and
reflected in the on-spot reports. This practice is going to be continued.
FINAL COMMENT FROM THE AUDITOR
The auditor accepts the comments and will follow up on this finding by the time the proposed plan has been carried
out.
10
Audit of management and control systems – Final Report
Finding No 4.4 - The principles of commenting on the Financial Control function checklist should be
clarified (Non-significant)
The TESIM project has published a working paper adaption on the Methodology for assessing management and
control systems, published by the European Commission, detailing the key requirements and assessment criteria for
the management and control system audits.
The Key requirement 4.3 states that written procedures and comprehensive checklists should exist to be used for
the management verifications to detect any material misstatements.
Currently, there is a comprehensive checklist used by the Financial Control function to assess the reports presented
by the partners.
However, the auditor notes that there is no clear policy of commenting on that checklist that is set for both the public
officers in Republic of Estonia and contracted auditors in Russian Federation. Therefore, the amount and detail of
comments added to the checklist by them varies, especially concerning the contracted auditors, since their number
is larger.
RISK: The auditor points out that if there is no clear policy of commenting on the checklist, the amount of information
in each checklist will be varied. There is a risk that this will affect the checks of the other Programme bodies (such
as the Managing Authority and the Certifying Authority function) that may want to use that information in their own
work.
RECOMMENDATION No 4.4 TO THE FINANCIAL CONTROL FUNCTION: The auditor recommends stating a clear
policy on commenting on the checklist used by the Financial Control function to assess the reports presented by the
partners. This policy should also be communicated to the contracted auditors in Russian Federation.
COMMENT FROM THE FINANCIAL CONTROL FUNCTION
The Financial Control function has agreed to fill the comment section in case there were problems with the cost –
the cost is (partially) ineligible or needed significant additional information to check.
Since it is not described in our procedure, we will add the explanation in the partner report control part during the
change of our procedures.
COMMENT FROM THE MANAGING AUTHORITY
The Managing Authority finds the Auditor’s recommendation useful, but it might be difficult to set a clear policy for
commenting the checklist, and to implement it. However, the Managing Authority is open to the discussions about
the practice and proposals of the Estonian Financial Control function. Also, if applied on the programme level to both
participating countries, the policy must be approved by the Joint Monitoring Committee.
FINAL COMMENT FROM THE AUDITOR
The auditor accepts the comments and will follow up on this finding by the time the proposed plan has been carried
out.
Key requirement 5: Effective system in place to ensure that all documents regarding expenditure
and audits are held to ensure an adequate audit trail
As the result of this audit, the auditor finds that the management and control system of the Estonia-Russia
Programme of this function regarded via the Key Requirement 5 works well. No improvements needed (Category 1)
6
6 Category 1 – Works well. No or only minor improvements needed
Category 2 - Works, but some improvements are needed
Category 3 – Works partially; substantial improvements are needed
11
Audit of management and control systems – Final Report
No findings.
Key requirement 6: Reliable system for collecting, recording and storing data for monitoring,
evaluation, financial management, verification and audit purposes, including links with electronic
data exchange systems with beneficiaries
As the result of this audit, the auditor finds that the management and control system of the Estonia-Russia
Programme of this function regarded via the Key Requirement 6 works well. No improvements needed (Category 1)
7
No findings.
Key requirement 7: Effective implementation of proportionate anti-fraud measures
As the result of this audit, the auditor finds that the management and control system of the Estonia-Russia
Programme of this function regarded via the Key Requirement 7 works well. No improvements needed (Category 1)
8
No findings.
Category 4 – Essentially does not work.
7 Category 1 – Works well. No or only minor improvements needed
Category 2 - Works, but some improvements are needed
Category 3 – Works partially; substantial improvements are needed
Category 4 – Essentially does not work.
8 Category 1 – Works well. No or only minor improvements needed
Category 2 - Works, but some improvements are needed
Category 3 – Works partially; substantial improvements are needed
Category 4 – Essentially does not work.
12
Audit of management and control systems – Final Report
ANNEX 1 – Summary opinion of the auditee’s management and control systems
Key requirement Category 1 Category 2 Category 3 Category 4
Key requirement 1: Adequate separation of
functions and adequate systems for reporting
and monitoring where the responsible X
authority entrusts execution of tasks to
another body
Key requirement 3: Adequate information to
beneficiaries X
Key requirement 4: Adequate management
verifications X
Key requirement 5: Effective system in place
to ensure that all documents are held to X
ensure an adequate audit trail
Key requirement 6: Reliable system for
collecting, recording and storing data for
monitoring, evaluation, financial management,
X
verification and audit purposes, including links
with electronic data exchange systems with
beneficiaries
Key requirement 7: Effective implementation
X
of proportionate anti-fraud measures
Summary opinion of the auditee’s
X
management and control systems
13
Mr. Slawomir Tokarski Your ref. 27/05/2021 No Ares
European Commission, Directorate- (2021)3508509
General, Regional and Urban Policy
European Territorial Cooperation, Macro- Our ref. 02.07.2021 No 10-2/5019-1
regions, Interreg and Programme
Implementation I
Reply: Analysis of the technical
part of the Annual Report and of
the documents submitted under
Article 68 of Commission
Implementing Regulation (EU) No
897/2014
Dear Mr. Tokarski
We received your letter concerning the observations and recommendations on the Annual
Audit Report and the Audit Opinion.
We thank you for raising the topics and providing us with the necessary information. In this
letter, we will clarify the points and set out the further activities in this regard.
1. Audit Opinion
The wording in the Audit Opinion will in the future follow more closely the template set out
by the TESIM guidance. This change will be implemented for the next Audit Opinion,
presented at the latest on the 15th of February 2022.
In addition, we do confirm that value of the expenses declared in the “Annual Report
Financial Part” (EUR 754 362.20) reconciles with the level of expenditure audited (EUR 1
106 257.87), as the latter is the total eligible expenditure, and the former is the European
Union funding part of that amount.
2. Functioning of the management and control system
a. System audit
The system audit mentioned in the report was not finalized, and we confirm that it is correct.
The audit mentioned has been finalized now and a copy of the final report will be included
with this letter. For the reference period, another system audit has been planned. That will
focus on the practice and reliability of the Programme output indicators and will be carried
out in the last quarter of the year 2021.
Suur-Ameerika 1 / 10122 Tallinn / Estonia / +372 611 3558 /
[email protected]
www.rahandusministeerium.ee / Reg. code: 70000272
In addition, we confirm that we will follow the recommendation to properly plan the system
audits to ensure that the activities are finalized, and the system audit report is issued in due
time before the submission of the assurance package. Also, we will consider the
recommendation to systematically submit its system audit reports to DG REGIO as soon as
they are finalized.
b. Scope of the system audit
It is not entirely correct to note that the scope of the system audit was only to verify a series
of key requirements and only for the Managing Authority – nor that AA did not audit and
does not plan to audit the system for other bodies involved in the implementation of the
programme (National Authorities or Control Contact Points).
We would like to point out that it is naturally the key requirements that provide the basis for
system audit planning. In carrying out the audits, that is also supported by testing the actual
practice of the Programme as well as interviewing the key persons carrying out or in charge
of that practice.
In addition, we would like to note that the Audit Strategy does say that the Control Contact
Points are planned to be audited and that the National Authorities will be audited as parts of
the processes of the Programme.
For the system audit at hand (the Financial Control function), the following Programme
bodies were audited:
The Financial Control function along with the function of the Control Contact Point
(those are not separate bodies in theory, but in practice their work is separated from
the Managing Authority).
The Joint Technical Secretariat.
The Managing Authority.
We must note that this is our standard practice when auditing a specific function – to
confirm how this function is established both within the function itself as well as in relation
to the Programme bodies. This means that no Programme bodies are excluded from the audit
work – nor does the Audit Strategy claim so.
Therefore, we would like to posit that our work in that regard is sufficient for forming an
opinion on the management and control system. However, we still welcome any additional
comments and recommendations for further improvement.
c. Follow-up for the previous system audit
The previous system audit, Audit of management and control systems of appropriate
selection of operations, did have four findings and recommendations.
The point 4.5 of the Annual Audit Report, Information on the follow-up of audit
recommendations from system audits from previous accounting years, details the follow-up
and closure of those points. This includes both actions taken by the auditee as well as the
subsequent verifications and decisions by the auditors.
2
In that regard, we find it unclear what is the necessary further detail of the work performed
in respect to the system audits that is requested. We welcome any clarifications for that
point, if necessary.
3. Audit strategy
a. Reference period
It is correct that we have presented the Audit strategy version as approved on the 15th of
February 2021. So far, we have always included the most up-do-date versions of documents.
We propose that in the future, both the previous version (covering the reference period) and
the new version (detailing the changes and updates resulting from the reference period) will
be included.
b. Description of procedures
We take a note of the recommendation to update some descriptions of procedures. This
change will be implemented for the next annual reporting, presented at the latest on the 15th
of February 2022.
c. Work plan
It is correct that there is no separate plan for auditing the National Authorities or for the
Control Contact Points. Still, we would like to point out that as described above, the Control
Contact Points were included in the audit of Financial Control function, as per their role.
Similarly, the National Authorities will be audited in accordance with their function in the
Programme. This is also in line with the principles set out in the Audit Strategy.
For the summary, we will include the previous Audit Strategy with this letter. We also take a
note of the recommendation to further detail the information in the following versions of the
Audit Strategy. That will include describing a longer plan on system audits, noting both the
areas covered and remaining.
4. Control Contact Point from Russia
We do confirm that the Control Contact Point from Russia was unfilled at the time of annual
reporting. This was also noted in the Annual Audit Report point 2.1. At the time of this
letter, this vacancy has already been filled.
5. Coordination and supervision between the audit bodies
Here, we provide additional detail in the coordination and supervision between the audit
bodies. First, we must note that there is no specific coordination between the Group of
Auditors and the external contractors, because as set in the Rules of Procedures of the Group
of Auditors, the GoA member representing the Russian Federation has merely a consulting
role.
This means that although the GoA member representing the Russian Federation is consulted
both at the planning and the finalization of the audits, they play no active role in the audits
themselves, thus not requiring a specific coordination procedure.
3
The audits carried out in the Russian Federation by Ernst & Young are reviewed as set out in
the contract requirements that the parties have entered.
In general, the procedure is as follows:
The auditor presents the Audit Authority the full audit file before finalizing the
preliminary report.
The Audit Authority reviews the entire file and presents the auditor with a list of
recommendations for changes and additions.
The auditor makes the necessary changes and additions before finalizing the
preliminary report and sending it to the auditee for comments.
If the comments and additional information presented by the auditor are substantial,
the process is repeated before finalizing the final report.
After finalizing the final report, the auditor presents the Audit Authority again with
the full audit file.
The Audit Authority again reviews the file and if it is in accordance with the
requirements, a document of delivery and receipt is signed. This finalizes the process
and authorizes the auditor for payment.
In addition, we will further detail the information in the following versions of the Annual
Audit Report, as they are presented.
6. Audit of operations
a. Description of the method
It is correct that the method used for determining the number of items included has not been
detailed by us. It has been mentioned that the sample must follow certain requirements (5%
of items and 10% of costs of the population must be included). Therefore, the method is to
simply select items at random and stop once this threshold has been exceeded. We will
further detail the information in the following versions of the Audit Strategy.
b. Sub-sampling
It is correct to find that the sub-sampling items were also selected randomly. We will further
detail the information in the following versions of the Audit Strategy.
7. Description of procedures performed for the audit of accounts
We concur that the level of information detailing the audit of accounts may have been
improved. In the following versions of the Annual Audit Report, we will follow the
recommendations to present the following:
Procedures that were performed.
Details concerning the time frame of the audit of accounts.
The verifications carried out.
The results of the respective verifications.
Regarding the recommendation to always issue a separate report of the audit of accounts, we
would disagree. We would like to point out that our Programme is small and considering
that in practice, we carry out the audit of accounts as a precursor to the annual reporting.
Therefore, its documentation is tied to the other activities and documentation of the annual
4
reporting. Instead, we propose to include more detail about the annual accounts in the
Annual Audit Report, as per your previous recommendation.
8. Level of assurance
As per your recommendation, the wording concerning the overall level of assurance
obtained, will in the future include a more comprehensive analysis of the level of assurance
obtained, including the combined results of system audits, audit of operations and audit of
accounts. This change will be implemented for the next Audit Opinion, presented at the
latest on the 15th of February 2022.
Yours sincerely,
(signed digitally)
Kaur Siruli
Head of the Audit Authority
Head of the Financial Control Department
Ministry of Finance of the Republic of Estonia
Enclosed:
System Audit Final Report No JKS-39/2020 in thirteen (13) pages.
Audit Strategy as approved on the 14th of February 2020 in nine (9) pages.