Sildfinantseerimise taotlus
Lugupeetud Pille Erm
Palume võimaldada Terviseametil kasutada sildfinantseerimise vahendeid kooskõlas „Riigieelarve
seaduse“ § 54 rahastamaks Euroopa Komisjoni Välihaigla projekti „European Modular Field
Hospital“.
Sildfinantseerimise vahendid summas 38 500 eurot palume võimaldada kasutada alates 13. märtsist
2017. a.
Eeldatav toetuse laekumise aeg on 30.06.2019. Taotletud summa ulatuses ei ole välistoetuse vahendite
laekumine kahtluse all. Vahendite osalise või täismahus mittelaekumise korral vastutab Terviseamet
sildfinantseerimise jäägi tagastamise eest.
Lugupidamisega
(allkirjastatud digitaalselt)
Tiiu Aro
peadirektor
Lisad: 1. Sildfin_taotlus_2017.xlsx
2. Grant Agreement_EUMFH.pdf
Olga Galaburda
+372 694 3513
[email protected]
Tartu mnt 85 Tel +372 694 3500 Tervishoiutöötajate ja tegevuslubade registrite
10115 Tallinn osakond: Gonsiori 29, Tallinn tel 650 9847
Kemikaaliohutuse osakond: Gonsiori 29, Tallinn tel 626 9388
Esmatasandi tervishoiu osakond: Gonsiori 29, Tallinn tel 650 9861
Erakorralise meditsiini osakond: Gonsiori 29, Tallinn tel 626 9860
Järelevalve osakond: Hiiu 42, Tallinn tel 694 3724
Meditsiiniseadmete osakond: Põllu 1a, Tartu tel +372 5809 4339
www.terviseamet.ee e-post:
[email protected] Kesklabor: Kotka 2, Tallinn tel 694 3673
Registrikood 70008799 Tartu labor: Põllu 1a, Tartu tel +372 5809 3071
Kohtla-Järve labor: Kalevi 10, Kohtla-Järve tel +372 5880 3572
Réi- D...............................
Ref. Ares(2016)6887556 - 09/12/2016
t r . .
European Commission
D9. 12.2016 ,
Directorate-General for European Civil Protection and Humanitarian Aid Operations (ECHO)
-
ECHO A - Emergency Management
Unit A4- Civil Protection Policy
Brussels,
ECHO.A.4 (2016)
Sent by DHL
Mr Luigi D'Angelo
Presidency of the Council of Ministers,
Italian Civil Protection Department
ViaUlpiano 11,
IT-00193 Rome,
E-mail:
[email protected]
Ref.: 2016 Call for prevention and preparedness projects in the field of civil
protection and marine pollution
Subject: Your proposal 2016/PREP/14 - European Union Medical Field Hospital
(EUMFH)
Dear Mr D'Angelo,
I have the pleasure of sending you two originals of the Grant Agreement already signed. Would
you please have the two agreements signed and dated with the mention “read and approved” by
the authorized person.
Moreover, please note that the annexes form an integral part of the Grant Agreement. Therefore,
the signed version of the Grant Agreement must be returned to the Commission together with
Annex(es) IV "Mandates provided to the coordinator by the other beneficiaries" - duly completed
and signed by each beneficiary.
One signed original Grant Agreement with the signed original annex(es) IV should be
returned to the following address within two weeks after you receive this letter:
European Commission
Directorate-General for European Civil Protection and Humanitarian Aid Operations
(ECHO) Document Management Sector D.5.002
L-86 03/022
BE-1049 Brussels
You may not, under any circumstances or procedures, introduce changes in the agreement
transmitted for signature. The Grant Agreement shall be considered concluded and shall enter into
Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. +32 22991111
Office: L-86 4/023 - Tel. direct line +32 229-65741
force on the date of receipt by ECHO of one original, duly signed by both parties with the
original version of the Annex(es) IV signed by each beneficiary.
Yours sincerely,
Mr Alfonso de la Eufnte üarrigosa
Acting Head óf Unit
Enclosure: Two copies of the grant agreement
cc. Elisabetta BELLOCCHI (ECHO.A4)
2
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
European Commission
Sįįr;
Directorate-General for European Civil Protection and Humanitarian Aid Operations (ECHO)
*.** +ч.
« * ECHO A - Emergency Management
** , « *
Unit A4- Civil Protection Policy
GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES
AGREEMENT NUMBER - ECHO/SUB/2016/739964/PREP14
This Agreement (‘the Agreement’) is concluded between the following parties:
on the one part,
The European Union (‘the Union’), represented by the European Commission (‘the
Commission’), represented for the purposes of signature of the Agreement by Mr Alfonso De
La Fuente Garrigosa, Acting Head of Unit,
and
on the other part,
1. Presidenza del Consiglio dei Ministri - Dipartimento di Protezione Civile
Public Law Body
11, Via Ulpiano
IT-00193 Rome
VAT n° 97018720587
represented for the purposes of signature of the Agreement by Mr Fabrizio CURCIO, Head
of Department
and the following other beneficiaries:
2. Federal Public Service of Health, established in Belgium
3. Beredskabsstyrelsen (Danish Emergency Management Agency), established in Denmark
4. Health Board, established in Estonia
5. Direction generale de la securité civile et de la gestion des crises, established in France
6. Johanniter-Unfall-Hilfe e.V., established in Germany
7. Universität Leipzig, established in Germany
1
Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016
8. Ministry of Internal Affairs - Department for Emergency Situations, established in
Romania
9. Asociácia samaritánov Slovenskej republiky, established in Slovakia
duly represented by the coordinator by virtue of the mandates included in Annex IV for the
signature of the Agreement,
Unless otherwise specified, references to ‘beneficiary’ and ‘beneficiaries’ include the
coordinator.
The parties referred to above
HAVE AGREED
to the Special Conditions (‘the Special Conditions’) and the following Annexes:
Annex I Description of the action
Annex II General Conditions (‘the General Conditions’)
Annex III Estimated budget of the action
Annex IV Mandates provided to the coordinator by the other beneficiaries
Annex V Guidelines for technical reports
Annex VI Model financial statement
Annex VII Model terms of reference for the certificate on the financial statements: not
applicable
Annex VIII Model terms of reference for the certificate on the compliance of the cost
accounting practices: not applicable
which form an integral part of the Agreement.
The provisions in the Special Conditions of the Agreement take precedence over its Annexes.
The provisions in Annex II ‘General Conditions’ take precedence over the other Annexes.
2
Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016
SPECIAL CONDITIONS
ARTICLE 1.1 - SUBJECT MATTER OF THE AGREEMENT
The Commission has decided to award a grant, under the terms and conditions set out in the
Special Conditions, the General Conditions and the other Annexes to the Agreement, for the
action entitled European Union Medical Field Hospital (EU-NOM) as described in Annex
I.
With the signature of the Agreement, the beneficiaries accept the grant and agree to
implement the action, acting on their own responsibility.
ARTICLE 1.2 - ENTRY INTO FORCE OF THE AGREEMENT AND
IMPLEMENTATION PERIOD
1.2.1 The Agreement enters into force on the date on which the last party signs.
1.2.2 The action runs for 24 months starting on 01/01/2017.
ARTICLE 1.3 - MAXIMUM AMOUNT AND FORM OF THE GRANT
1.3.1 The maximum amount of the grant is EUR 784 406.
1.3.2 The grant takes the form of:
(a) the reimbursement of 75% of the eligible costs of the action (‘reimbursement of eligible
costs’), which are estimated at EUR 1045 875 and which are:
(i) actually incurred (‘reimbursement of actual costs’) for the beneficiaries
(ii) reimbursement of unit costs: not applicable
(iii) reimbursement of lump sum costs: not applicable
(iv) declared on the basis of a flat rate of 2% of the eligible direct costs (‘reimbursement
of flat-rate costs’) for the indirect cost for the beneficiaries
(v) reimbursement of costs declared on the basis of the beneficiary’s usual cost
accounting practices: not applicable
(b) unit contribution: not applicable
(c) lump sum contribution: not applicable
(d) flat-rate contribution: not applicable
ARTICLE 1.4 - REPORTING - REQUESTS FOR PAYMENT
1.4.1 Reporting periods
The action is divided into úit following reporting periods:
3
Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016
- Reporting period 1 : from month 1 to month 8
- Reporting period 2: from month 9 to month 16
- Final reporting period: from month 1 to the end of the implementation period
Within 60 days following:
(a) the end of reporting periods 1 and 2 the coordinator must submit a report on the
implementation of the action covering the period concerned in accordance with
Annex V;
(b) the end of the final reporting period the coordinator must submit a request for
payment of the balance in accordance with Article 1.4.4.
1.4.2 Request for further pre-financing payment and supporting documents:
Not applicable
1.4.3 Request[s] for interim payments] and supporting documents
Not applicable
1.4.4 Request for payment of the balance and supporting documents
The coordinator must submit a request for payment of the balance within the deadline
indicated in Article 1.4.1 accompanied by the following documents:
(a) a final report on implementation of the action (‘final technical report’), drawn up in
accordance with Annex V, containing:
(i) the information needed to justify the eligible costs declared or the contribution
requested on the basis of unit costs and lump sums (where the grant takes the
form of the reimbursement of unit or lump sum costs or of a unit or lump sum
contribution in accordance with Article I.3.2(a)(ii) and (iii), (b) or (c)), and
(ii) information on subcontracting as referred to in Article II. 11.1(d);
(b) a final financial statement (‘final financial statement’): not applicable ;
(c) a summary financial statement (‘summary financial statement’).
This statement must include a consolidated financial statement and a breakdown of the
amounts declared or requested by each beneficiary and its affiliated entities and must
indicate the receipts referred to in Article 11.25.3 for each beneficiary and its affiliated
entities.
It must be drawn up in accordance with Annex VI;
(d) a certificate on the financial statements and underlying accounts (‘certificate on the
financial statements’) for each beneficiary and for each affiliated entity, if:
(i) the cumulative amount of payments the beneficiary requests as reimbursement
of actual costs as referred to in Article I.3.2(a)(i) (and for which no
certificate has yet been submitted) is EUR 325 000 or more;
(ii) the maximum grant amount indicated, for that beneficiary and its affiliated
entities, in the estimated budget as reimbursement of actual costs is EUR
750 000 or more.
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
This certificate must be produced by an approved auditor or, in case of public bodies, by
a competent and independent public officer and drawn up in accordance with Annex
VII.
It must certify that the costs declared in the final financial statement by the beneficiary
concerned or its affiliated entities for the categories of costs reimbursed in accordance
with Article I.3.2(a)(i) are real, accurately recorded and eligible in accordance with the
Agreement.
In addition, it must certify that all the receipts referred to in Article 11.25.3 have been
declared.
The coordinator must certify that the information provided in the request for payment of the
balance is full, reliable and true.
It must also certify that the costs incurred can be considered eligible in accordance with the
Agreement and that the request for payment is substantiated by adequate supporting
documents that can be produced in the context of the checks or audits described in Article
11.27.
In addition, it must certify that all the receipts referred to in Article II.25.3 have been
declared.
1.4.5 Information on cumulative expenditure incurred
Not applicable
1.4.6 Currency for requests for payment and financial statements and conversion
into euro
Requests for payment and financial statements must be drafted in euro.
Beneficiaries and affiliated entities with general accounts in a currency other than the euro
must convert costs incurred in another currency into euro at the average of the daily exchange
rates published in the C series of Official Journal of the European Union, determined over the
corresponding reporting period (available at
http://www.ecb.europa.eu/stats/exchange/eurofxref/html/index.en.html ).
If no daily euro exchange rate is published in the Official Journal of the European Union for
the currency in question, conversion must be made at the average of the monthly accounting
rates established by the Commission and published on its website
(http://ec.europa.eu/budget/contracts grants/info contracts/inforeuro/inforeuro en.cfrn),
determined over the corresponding reporting period.
Beneficiaries and affiliated entities with general accounts in euro must convert costs incurred
in another currency into euro according to their usual accounting practices.
1.4.7 Language of requests for payments, technical reports and financial
statements
5
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
All requests for payments, technical reports and financial statements must be submitted in
English.
ARTICLE 1.5 - PAYMENTS AND PAYMENT ARRANGEMENTS
1.5.1 Payments to be made
The Commission must make the following payments to the coordinator:
- one pre-financing payment;
- one payment of the balance, on the basis of the request for payment of the balance referred
to in Article 1.4.4.
1.5.2 Pre-financing payment
The aim of the pre-financing is to provide the beneficiaries with a float. It remains the
property of the Union until it is cleared against interim payments or, if it is not cleared against
interim payments, until the payment of the balance.
The Commission must make the pre-financing payment of EUR 549 084,20 to the
coordinator within 30 calendar days from the entry into force of the Agreement, except if
Article 11.24.1 applies.
1.5.3 Interim payment[s]
Not applicable
1.5.4 Payment of the balance
The payment of the balance reimburses or covers the remaining part of the eligible costs
incurred by the beneficiaries for the implementation of the action.
If the total amount of earlier payments is greater than the final amount of the grant determined
in accordance with Article 11.25, the payment of the balance takes the form of a recovery as
provided for by Article 11.26.
If the total amount of earlier payments is lower than the final amount of the grant determined
in accordance with Article 11.25, the Commission must pay the balance within 60 calendar
days from receiving the documents referred to in Article 1.4.4, except if Article 11.24.1 or
II.24.2 apply.
Payment is subject to the approval of the request for payment of the balance and of the
accompanying documents. Their approval does not imply recognition of the compliance,
authenticity, completeness or correctness of their content.
The amount due as the balance is determined by deducting the total amount of pre-financing
and interim payments (if any) already made from the final amount of the grant determined in
accordance with Article 11.25.
6
Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016
The amount to be paid may however be offset, without the beneficiary’s consent, against any
other amount owed by the beneficiary to the Commission or to an executive agency (under
the EU or Euratom budget), up to the maximum contribution indicated, for that beneficiary, in
the estimated budget in Annex III.
1.5.5 Notification of amounts due
The Commission must send a formal notification to the coordinator:
(a) informing it about the amount due and
(b) specifying whether it concerns a further pre-financing payment, an interim payment or
the payment of the balance.
For the payment of the balance, it must also specify the final amount of the grant determined
in accordance with Article 11.25.
1.5.6 Interest on late payment
If the Commission does not pay within the time limits for payment, the beneficiaries are
entitled to late-payment interest at the rate applied by the European Central Bank for its main
refinancing operations in euros (‘the reference rate’), plus three and a half points. The
reference rate is the rate in force on the first day of the month in which the time limit for
payment expires, as published in the C series of the Ojficial Journal of the European Union.
Late-payment interest is not due if all beneficiaries are Member States of the Union (including
regional and local government authorities and other public bodies acting in the name and on
behalf of the Member State for the purpose of the Agreement).
The suspension of the time limit for payment in accordance with Article II.24.2 or of payment
by the Commission in accordance with Article 11.24.1 may not be considered as late payment,
Late-payment interest covers the period running from the day following the due date for
payment, up to and including the date of actual payment as established in Article 1.5.8. The
interest payable is not considered for the purposes of determining the final amount of grant
within the meaning of Article 11.25.
As an exception to the first subparagraph, when the calculated interest is lower than or equal
to EUR 200, it must be paid to the coordinator only upon request submitted within two
months of receiving late payment.
1.5.7 Currency for payments
The Commission must make payments in euro.
1.5.8 Date of payment
Payments by the Commission are considered to have been carried out on the date when they
are debited to its account.
1.5.9 Costs of payment transfers
7
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
Costs of the payment transfers are bome in the following way:
(a) the Commission bears the costs of transfer charged by its bank;
(b) the beneficiary bears the costs of transfer charged by its bank;
(c) the party causing a repetition of a transfer bears all costs of repeated transfers.
1.5.10 Payments to the coordinator
The Commission must make payments to the coordinator.
Payments to the coordinator discharge the Commission from its payment obligation.
ARTICLE 1.6 - BANK ACCOUNT FOR PAYMENTS
All payments must be made to the coordinator’s bank account as indicated below:
Name of bank: Banca d'Italia Tesoreria central dello Stato
Address of branch: Via XX Settembre 97E, IT-00187 Rome, Italy
IBAN code: IT49 J0100003245350200022330
ARTICLE 1.7 - DATA CONTROLLER, COMMUNICATION DETAILS OF THE
PARTIES
1.7.1 Data controller
The entity acting as a data controller according to Article II.7 is the Head of Unit in charge of
legal affairs of the Commission's Directorate-General for European Civil Protection and
Humanitarian Aid Operations.
1.7.2 Communication details of the Commission
Any communication addressed to the Commission must be sent to the following address:
European Commission
Directorate-General for European Civil Protection and Humanitarian Aid Operations -
ECHO
Unit A/4 - Civil Protection Policy
L-86,04/27
BE-1049 Brussels
Email: ECHO-CP-P£
[email protected]
1.7.3 Communication details of the beneficiaries
Any communication from the Commission to the beneficiaries must be sent to the following
address:
Civil Protection Department
Presidency of the Council of Ministers
11, Via Ulpiano
IT-00193 Rome
8
Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016
E-mail:
[email protected]
1.8 SPECIFIC CONDITIONS
1.8.1 Spatial data
Not applicable
1.8.2 Ineligibility of cost of staff of national administrations
By way of derogation from Article II. 19.2 (a), the costs related to staff of national
administrations are eligible only to the extent that they relate to the cost of activities which the
relevant public authority would not carry out if the Action concerned were not undertaken.
1.8.3 Co-financiers
Not applicable
1.8.4 Communication concerning the suspension of the time limit for payment
By derogation from Article II.24.2.2, communication concerning the suspension of the time
limit for payment shall be done by e-mail.
1.8.5 Entities affiliated to the beneficiaries
Not applicable
1.8.6 Additional provisions on use of the results (including intellectual and
industrial property rights)
Not applicable
1.8.7 Obligation to conclude an internal co-operation agreement
Not applicable
1.8.8 Special provisions on the financial responsibility for recoveries
Not applicable
1.8.9 Ineligibility of value added tax
As an exception to Article II. 19.2 (h), paid value added tax (VAT) is not eligible for tasks
1,2,3 and 4 as described in the application form for the following beneficiaries:
1. Presidenza del Consiglio dei Ministri - Dipartimento di Protezione Civile, established
in Italy
2. Federai Public Service of Health, established in Belgium
3. Beredskabsstyrelsen (Danish Emergency Management Agency), established in Denmark
Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016
4. Health Board, established in Estonia
5. Direction generale de la securité civile et de la gestion des crises, established in France
6. Ministry of Internal Affairs - Department for Emergency Situations, established in
Romania
1.8.10 Special provisions on budget transfers
As an exception to the first subparagraph of Article 11.22, budget transfers between budget
categories are limited to EUR 30 000 of the amount of each budget category for which the
transfer is intended.
1.8.11 Settlement of disputes with non EU beneficiaries
Not applicable
1.8.12 Beneficiaries which are international organisations
Not applicable
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
SIGNATURES
For the coordinator For the Commission
Mr Fabrizio CURCIO, Mr Alfonso De La Fugħte tiamgosa ’
Head of Department Acting Head of Unit ĮTV
[signature] [signature]
Done at [place], [date] Done at Brussels, [date] 0 9 DEC, 2011
11
12
Form Т1 - Description of the action - Annex I
SUMMARY OF THE PROJECT (max 20 lines per box)
Title of the project EUMFH: European Union Modular Field Hospital
Prevention or preparedness Preparedness
Actions aimed at enhancing operational cooperation in the
Priority covered framework of the Mechanism, including across sectors, enabling
countries to develop, exercise and register multinational assets.
Internal or External Internal
- ,
1. Summary of the project
Describe the context and the issue/challenge/gap that the proposal aims to address.
The European medical response system is currently comprised of first responder units that are
operating in a quick and light manner. While those capacities constitute an essential Union Civil
Protection (UCP) element, emergencies like the earthquake in Haiti, or more recently the typhoon in
the Philippines and the Ebola crisis, have clearly demonstrated the necessity for more enhanced and
comprehensive health capacities for a longer duration, ranging from 3 weeks up to 3 + months,
bridging towards a more structural long term relief. Experience demonstrates that when medical teams
are deployed, local capacity is often hit in such a hard way that a referral to local healthcare facilities
becomes impossible. Moreover, the strong involvement of the UCP Mechanism in humanitarian crises
(i.e. Tunisia, Jordan, and Turkey) highlights and reinforces the need to expand these capabilities.
In 2010, after the Haiti Earthquake and the Pakistan floods, the Global Health Cluster identified a need
to ensure quality and standardise services provided by International Medical teams. The Emergency
Medical Teams (EMT) - working group of the Global Health Cluster developed a document outlining
the minimum standards for EMT’s and the variety of services they provide as well as a referral system.
This work is still ongoing under the guidance of the World Health Organisation (WHO). The goal is to
ensure a coordinated package of services accountable to the care-seeker and the local government to
which the services are offered. A registration system was developed where medical teams can
register themselves and declare that they will work according to the minimum standards.
Current developments show that there is a clear lack of active deployable level 3 Emergency Medical
Teams i.e. referral hospitals in the field. Therefore, there is a real need for a high level medical module
that can be deployed for a longer term mission without putting the burden on one single Member State
or organisation.
13
14
2.0bjectives
Describe the general and specific objectives of the project in relation to the priority chosen.
The deployment of a more comprehensive health capacity requires the involvement of extensive
human resources and logistic elements for medium or long-term periods. In most cases, Civil
Protection organisations are neither prepared nor equipped for this kind of deployment. Furthermore,
this kind of operation generates high costs and requires a strong and long lasting commitment. To be
effective, a different approach is required, which can be based on a joint operation where several
Participating States combine their efforts in a coordinated manner.
The project European Modular Field Hospital (EUMFH) aims to explore how to improve the medical
capacity of the UCPM while meeting high standards of quality, rapid deployment, and
accountability and sustainability for the deployment of a common European medical capacity
to deliver healthcare in accordance with, or above, the minimum standards drafted by the WHO
EMT working group.
The following specific objectives for the project were identified:
• What are the components or sub-units and their requirements for a EU EMT type 3?
• What is the profile of personnel? And what are the trainings and exercises required for a EU
EMT 3?
• What training is needed? How is interoperability feasible?
• What are the Terms of Reference (TOR’S) and Standing Operating Procedures (SOP’s)?
• What standards of care should be achieved? How can they be implemented?
• What are the standard and how can a common architectural structure for a EUEMT 3 be
delivered?
3. Expected results
Describe the expected results of the project. What will be the short, medium and long term impacts
and the added value of these results? Please describe how the project will improve or complement
the existing market situation, latest developments or current practices in the relevant area?
Demonstrate the complementarity to the efforts already made in the relevant area
The expected results include among others, to design and test a multinational asset. This project will
assess the possibility to build:
• An immediately deployable and self-sufficient European healthcare infrastructure meeting the
requirements of a level 3 facility in the Guidelines for Foreign Medical Teams in sudden onset
disasters.
• With highly qualified and trained staff
• Adhering to all relevant standards of care
• With a tested and proven concept for a multinational cooperation
• With TOR’S and SOP’s for implementing partners
15
The EUMFH-concept should guarantee interoperability, internally as well as with relevant partners in
the field as e.g. Ministry of Health, World Health Organisation, UCP team, OSOCC, the EMTCC,
other medical teams...
The outcome of this project will not be the direct registration of an EMT level 3 in CECIS at this
moment. However, it will create the necessary conditions and the opportunity for those Member
States that consider doing so. Several Member States have already indicated that this project will be
used by them to determine their commitment, and consider it as an added value to define their
contribution.
The concept might prove an opportunity for future projects to consider implementing the hospital in
future projects e.g. as an asset in the Voluntary Pool in CECIS and/or in the WHO Global Registry of
International Emergency Medical Teams.
4. Final beneficiaries
Indicate who would be the potential beneficiaries and end-users of your project results. Please
demonstrate their interest and support (e.g. enclose letters of support).
Potential beneficiaries of the EUMFH-project are:
• The population in need of healthcare after a disaster that impacted the local healthcare
infrastructure.
• The impacted national system and other International Medical Teams on the ground:
Special focus will be on high level, referral care, that can’t be delivered by the available
national system, or by other international medical teams on the ground.
• Member States that do not have registered medical teams: The project can be an
opportunity for those Member States that do not have registered medical teams, but do
have an added value available (staff, infrastructure, ...) to be part of an integrated
multinational response with high impact.
• Other modules of the UCPM: The EUMFH can be used as a referral centre for staff of the
other UCPM - modules in the field
• Medical Non-Governmental Organisations (NGOs): the EUMFH can bridge from civil
protection towards humanitarian assistance during a major crisis and this structure could be
handed over during the recovery phase.
16
5. Methodology/Organizational structure
Describe the methodology to be used to achieve the expected result, present briefly the
partnership and the project team who will be responsible for the project tasks. Describe the
preparatory work already done and the considerations for the composition of the partnership.
Consensus was reached to use the main tasks that are also used in the “Guidelines for Foreign
Medical Teams in Sudden Onset Disasters” to identify the necessary actions in the project. For
project purposes we added project management.
• Governance
• Logistics
• Healthcare
• Staff, Training and Exercises
• Project Management
For each task there will be a working group under the guidance of one of the consortium partners.
Each of these working groups has a number of assigned actions, under responsibility of one of the
partners.
17
6. Implementing partnership and projectteam
Give details on how the implementing partnership will cooperate during the implementation of the
project; explain the roles and responsibilities of the different partner organisations and any
subcontracting arrangements (if applicable). If the successful project implementation necessitates
contribution /involvement of any other organisation (e.g. providing access to a venue or information
by a public authority, etc.) please explain the necessary arrangements.
• Overall project lead (coordinating beneficiary): Italian Civil Protection Department
• Project management group: Belgian Ministry of Health, Italian Civil Protection Department
and Johanniter-Unfall-Hilfe Germany. Johanniter-Unfall-Hilfe Germany will be responsible for
the administrative issues and financial management of the project.
• Steering committee: Belgian Ministry of Health, Danish Emergency Management Agency,
Estonian Health Board, Italian Civil Protection Department, Johanniter-Unfall-Hilfe Germany,
French Directorate General for Civil Protection and Crisis Management, Romanian
Department of Emergency Situations, the Asociácia Samaritánov Slovenskej Republiky from
the Slovak Republic and the University of Leipzig.
• Advisory body: World Health Organisation (WHO) as a permanent member, Handicap
International, National Centre of Emergency Care Greece (EKAB) and others can be invited
on an ad-hoc basis. There was an exchange of letters with the European Centre of Disease
Control. Though there is no commitment from their side at this moment, they are very
interested and seriously consider cooperating when the project is approved. DG ECHO A5 /
B1 will be invited to provide feedback on how they can be involved in the most optimal way to
enhance future cooperation.
18
Four Main tasks were identified (See Paragraph 5, Methodology/Organisational Structure) to be
completed each under the guidance of one of the members of the consortium (steering committee).
Each of these main tasks will cover different actions, again under the guidance of one of the
consortium members.
The role of the project management team is to supervise the progress and outcome of each task and
each activity. Reporting to and communicating with the European Commission will be done by the
Italian Civil Protection Department.
On several occasions the results and progress will be reported to the steering committee and the
advisory body to collect feedback.
The main tasks were divided as follows:
Italian Civil Protection Department Coordinating Beneficiary
Belgian Federal Public Service of Health Project Management
Danish Emergency Management Agency Logistics
Estonian Health Board Healthcare
French DG for Civil Protection and Crisis Management Governance
Project Management, Administration
Johanniter-Unfall-Hilfe Germany
and Finances
IT Assistance for medical treatment and
Leipzig University
digital common patient record
Romanian Department for Emergency Situations /
Staff, Training and Exercise
Ministry of Internal Affairs
Asociácia Samaritánov Slovenskej Republiky, Slovak
Support in all relevant tasks
Republic
19
Although most tasks have different starting dates, they will all proceed until the end of the project.
This is important to ensure that feedback from a certain task is incorporated in the end result of the
other tasks. Since it is important to keep an overview, the project management will cover the whole
time frame of the project. The project will start by studying the government for the structure. Shortly
after the health care task will start, followed by logistics and finally staff, training and exercise. The
project will end with delivery of a final report, and considerations on sustainability.
.1/1/201?·
3i/i2/iOia
StakeMdera Workshop Workshop on Logistics
Workshop 1 on Governance ■ SteeringCommiteemeetingS
Steering Commttteemeeting2 Workshop 1 on Staff, Training and Exercise Final Meeting: Steering Committee
Kick-off meetings Steering meetings
Committee meetingl Workshopl on Healthcare Workshop 2 on Governance Workshop 2 on Healthcare Steering Committee meeting 4
2017 2018
7. Monitoring and risks mitigation
Explain how you will monitor the project and ensure timely and proper implementation. Describe
what are the risks that could jeopardise the successful project implementation and how do you
plan to mitigate those risks.
The following monitoring activities will be conducted:
• Monthly project updates through video-/phone-conferences where task implementation,
activities and potential risks will be discussed
• Monthly reporting through management reports, which will be submitted by each team
leader to the Project Manager including descriptions of work done and work planned as well
as their time sheets
• Regular progress meetings to review the project implementation, documentation and
deliverables
• Regular steering committee meetings for strategic decisions, monitoring, evaluating and
planning of the main areas of the project
• Each of the team leaders is responsible for the timely deliveries of his team’s expected
results and will monitor progress consistently
20
» Budget has been drafted on most recent insights and previous projects.Johanniter Germany
will be responsible to follow up the financial projectimplementatlon
• Invitation of relevant stakeholders to a preliminary workshop with the aim of early inclusion in
the project, and motivated involvement in project development and implementation
• Objectives have been carefully chosen because of the complexity of the project. Every task
and activity has tťs own responsible organisation appointed. The project management team
will foliový up on progression
»The shared-responsibility projectteam structure ensures responsibility is shared equally
between alt project partners. The project management team is responsible to ensure
methodology is followed.
• Experienced medical teams are involved in the development ofthe project to ensure
compliance and interoperability. The advisory team wiii ensure used equipment and standards
are at the right level.
• Several of the consortium partners are national competent authorities and will follow up
closely on any changes. ^ "
8. Evaluation
Explain how you will evaluate the results during and after the implementation of the actions. In
particular, explain which indicators (qualitative and quantitative) will be used and explain how you
will monitor and check the financial Implementation of the project
Evaluation of the project results will be conducted by a dedicated Project Quality Manager (tbd). At
the beginning of the project, a project quality plan will be defined with a set of activities that help
achieve quality in the project being executed. These activities are defined on the basis of the
quality standards set by the consortium partners.
The project quality plan identifies which quality standards are relevant to the project and
determines how they can be achieved. It includes the implementation of quality events (peer
reviews, checklist execution) by using various quality materials (templates, standards, checklists)
available within the beneficiary’s organisations and/or from previous projects. Besides this there is
an advisory board with relevant organisations that will ensure the use of the outcome of the project
is up to standard. The Steering Committee, during their meetings, will be responsible to monitor
and control the quality of the project using these quality materials. As an output of these various
activities, quality measurements are captured which assist in continuous improvement of quality
thus adding to the inventory of lessons learned.
Major quality criteria are technical performance (deliverables achieved as planned), financial
performance (budget spent as planned), schedule performance (compliance with project schedule),
interoperability, transparency, reliability, and accountability.
21
The financial implementation of the project will be managed by Johanniter-Unfall-Hilfe Germany
with the aim of ensuring that all project deliverables will be reached in a cost-saving and efficient
way (e.g. all transactions have to be approved by Johanniter Germany and the Project Manager).
9. Cost efficiency and value for money
Demonstrate that your project represents a good value for money and that you aimed for cost
efficiency in the estimated budget. You may include any comments of the horizontal nature in
relation to the items presented in the estimated budget.
The project budget has been drafted carefully based on previous and current projects, integrating
lessons learned, and with the purpose of receiving best value for money. EUMFH does not aim at
purchasing lots of materials; the focus is rather to make best use of the existing EU-financed
equipment (from existing medical and other modules/teams) and to enhance existing teams in
cooperating with each other to achieve the highest possible outcome.
Project meetings, training courses and other “physical” meetings are designed and planned in such
a way, that the lowest possible travel and subsistence costs occur (e.g. all trainings and the
exercise will be conducted in the most cost efficient way in order to reduce the overall
accommodation and subsistence costs; meetings will be held primarily via phone-/video-
conference where possible). All possibilities will be explored to integrate the exercise included in
the EUMFH-project in an already planned Modex- or Full Scale exercise, thus reducing the cost
while adding value for both.
Each of the partners brings in a large amount of in-kind contribution into the project (e.g. personnel
working time), thus elevating the value of the overall project while guaranteeing cost efficiency.
10. European dimension
Demonstrate the European dimension and relevance of the project. There must be an added value
in developing and implementing the action in a transnational partnership at international level
rather than at national level. Please note that the ELI funding should complement existing
actions/projects and not duplicate activities.
The EUMFH-project aims at developing a new concept as an answer to a proven need in the field:
the lack of level 3 Emergency Medical Teams that can stay active for a longer time period. The
overall objective of the project is to clear the way for a multinational deployment where costs and
responsibilities can be shared amongst several Member States.
The EUMFH will be rapid-deployable with a backbone structure that can gradually grow to a fully
equipped and staffed field hospital with a high standard of care, making efficient and qualitative use
of Europe’s knowledge and experience. The facility can thus be used as a referral centre for other
modules in the UCPM and other actors in the field.
22
The project makes efficient use of experience that was gathered in previous deployments of other
Member States, integrating this in the most appropriate answer to the current guidelines and
standards and, most important, to the needs in the field.
11. Strategies for dissemination
Explain your plans for dissemination of the results. Describe how the knowledge gathered/
generated during the project will be transferred outside the partnership.
For dissemination of the results of the project, the following activities are planned: coordination,
preparation and review of dissemination material like the project website, Facebook page, Twitter
account, flyer, brochures, presentations, press releases and a press meeting.
The main purpose of the project website, Facebook page and Twitter account is to present the
EUMFH project and the participating organisations, to publish those results of the project that are
intended for the public (e.g. flyer, brochure, Standard Operating Procedures, etc.) and to provide a
platform for knowledge exchange for both team members and other interested parties.
A project flyer will be designed and printed to be distributed in meetings, conferences, exercises
and trainings by representatives of the organisations or by members of the EUMFH team. Potential
occasions for presenting the project are the European Civil Protection Forum and the annual
Humanitarian Networks and Partnerships week organised by the United Nations’ Office for
Coordination of Humanitarian Affairs in Geneva, or by inviting observers to the training and the
exercise. At the end of the project, an 8-12-page layman’s report (in the form of a brochure) will
be distributed widely after the project’s end. Regular press releases will be issued to local,
national and European press before or after important milestones of the project, like the
stakeholders’ workshop, the team trainings or the exercise. Additionally, these press releases are
posted on all participating organisation’s websites as well as the project website. One of the
trainings or the exercise will represent a suitable background for the conduct of a press meeting,
where local and national media will be invited and the EUMFH project and its objectives and the
team are presented.
Through these various dissemination activities, the concept will be widely spread and can easily be
reproduced by other interested authorities.
23
12. Sustainability
Although a project is by definition limited in time, the aim is to make the results sustainable.
Present the plan to ensure the financial and technical sustainability of the project. (If applicable)
As in previous projects, a sustainable and long lasting integration of the project results is an
underlying principle of all project partners. A sustainability concept will be drafted to make sure that
each of the partners can integrate it into their own disaster response concept.
There are several aspects to project sustainability that will be taken into consideration:
• Using the results of this project for future projects
• Equitable sharing and distribution of project results
• Institutional stability (continuous management support)
Technical sustainability will be achieved through developing procedures and means for maintaining
training standards.
The project team’s overall vision is that this project can be the source of a group of following
activities and projects, leading to the growth of the Union Civil Protection Mechanism’s medical
response to be a worldwide example.
13. External budget proposal
Please specify which country/ies are the primary beneficiary of the project and describe their role.
14. Spatial data
Please indicate whether electronic tools containing spatial data1 - any data with a direct or indirect
reference to a specific location or geographical area - will be produced during this project.
Directive 2007/2/EC of the European Parliament and of the Council of 14 March 2007 establishing an Infrastructure for Spatial
Information in the European Union (INSPIRE) (OJ L 108, 25.4.2007, p. 1).
24
15. Subcontracting
Please provide a list of all the tasks that will be subcontracted, including the information on the
relevant provider and procedure. Having regard to the nature of the action and what is necessary
for its implementation, explain as well the added-value of the subcontracting (information to be in
line with the information provided in form F5).
Several but rather limited parts of tasks will be subcontracted:
• The project will use the knowledge and know-how of experienced medical staff and other
experts from different organisations involved in international medical relief. This will be
done, amongst others, via the non-profit organisation “International Disaster and
Emergency Management Support” (IDEMS). The concerned staff will be mainly involved in
the trainings and the exercise, but also provide their advice on other topics in the project.
• There will be a cooperation with “Campus Vesta”, the school for Emergency Services in the
Belgian Province of Antwerp. They will provide experts and the premises of the school can
be used during the both trainings.
• The others tasks to be subcontracted are the development of a project video and the project
website.
25
26
Agreement number: EC HO/S U B/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016
ANNEX II
GENERAL CONDITIONS
PART A - LEGAL AND ADMINISTRATIVE PROVISIONS
ARTICLE ILI - DEFINITIONS
The following definitions (indicated in italics in the text) apply for the purpose of the
Agreement:
‘Action’: the set of activities/ the project, for which the grant is awarded, to be implemented
by the beneficiaries as described in Annex I.
‘Confidential information or document’: any information or document (in any format)
received by either party from the other or accessed by either party in the context of the
implementation of the Agreement that any of the parties has identified in writing as
confidential. It does not include information that is publicly available.
‘Conflict of interests’: a situation where the impartial and objective implementation of the
Agreement by a beneficiary is compromised for reasons involving family, emotional life,
political or national affinity, economic interest, or any other shared interest with the
Commission or any third party related to the subject matter of the Agreement.
‘Direct costs’: those specific costs which are directly linked to the implementation of the
action and can therefore be attributed directly to it. They may not include any indirect costs;
-‘Force majeure’: any unforeseeable, exceptional situation or event beyond the control of the
parties that prevents either of them from fulfilling any of their obligations under the
Agreement, which is not attributable to error or negligence on their part or on the part of the
subcontractors affiliated entities or third parties in receipt of financial support and which
proves to be inevitable despite their exercising due diligence. The following cannot be
invoked as force majeure: labour disputes, strikes, financial difficulties or any default of a
service, defect in equipment or material or delays in making them available, unless they stem
directly from a relevant case of force majeure;
‘Formal notification’: form of communication between the parties made in writing by mail
or electronic mail which provides the sender with a compelling evidence that the message was
delivered to the specified recipient;
‘Fraud’: any intentional act or omission affecting the Union’s financial interests relating to
the use or presentation of false, incorrect or incomplete statements or documents, to non
disclosure of information in violation of a specific obligation;
‘Implementation period’: the period of implementation of the activities forming part of the
action as specified in Article 1.2.2;
‘Indirect costs’: those costs which are not specific costs directly linked to the implementation
of the action and can therefore not be attributed directly to it. They may not include any costs
identifiable or declared as eligible direct costs;
27
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
‘Irregularity’: any infringement of a provision of Union law resulting from an act or
omission by a beneficiary, which has, or would have, the effect of prejudicing the Union’s
budget;
‘Maximum amount of the grant’: the maximum EU contribution to the action as defined in
Article 1.3.1;
‘Pre-existing material’: any material, document, technology or know-how which exists prior
to the beneficiary using it for the production of a result in the implementation of the action;
‘Pre-existing right’: any industrial and intellectual property right on pre-existing material; it
may consist in right of ownership, licence right and/or right of use belonging to the
beneficiary or any other third parties;
‘Related person’: any person who has the power to represent the beneficiary or to take
decisions on its behalf;
‘Starting date’: the date on which the implementation of the action starts as provided for in
Article 1.2.2;
‘Subcontract’: a procurement contract within the meaning of Article 11.10, which covers the
implementation by a third party of tasks forming part of the action as described in Annex I;
‘Substantial error’: any infringement of a provision of an agreement resulting from an act or
omission, which causes or might cause a loss to the Union’s budget.
ARTICLE II.2 - GENERAL OBLIGATIONS AND ROLES OF THE
BENEFICIARIES
11.2.1 General obligations and role of the beneficiaries
The beneficiaries:
(a) are jointly and severally liable for carrying out the action in accordance with the
Agreement. If a beneficiary fails to implement its part of the action, the other
beneficiaries become responsible for implementing this part (without so increasing the
maximum amount of the grant);
(b) must comply jointly or individually with any legal obligations they are bound by under
applicable EU, international and national law;
(c) must make appropriate internal arrangements for the proper implementation of the
action, consistent with the provisions of the Agreement; where provided for in the
Special Conditions, those arrangements must take the form of an internal co-operation
agreement between the beneficiaries.
11.2.2 General obligations and role of each beneficiary
Each beneficiary must:
28
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
(a) inform the coordinator immediately of any events or circumstances likely to affect or
delay the implementation of the action of which the beneficiary is aware;
(b) inform the coordinator immediately:
of any change in its legal, financial, technical, organisational or ownership situation and of
any change in its name, address or legal representative;
of any change in the legal, financial, technical, organisational or ownership situation of its
affiliated entities and of any change in their name, address or legal representative;
(c) submit in due time to the coordinator:
(i) the data needed to draw up the reports, financial statements and other documents
provided for in the Agreement;
(ii) all the necessary documents in the event of audits, checks or evaluation in
accordance with Article ÍI.27.
(iii) any other information to be provided to the Commission according to the
Agreement, except if the Agreement requires such information to be submitted
directly by the beneficiary.
II.2.3 General obligations and role of the coordinator
The coordinator:
(a) must monitor that the action is implemented in accordance with the Agreement;
(b) is the intermediary for all communications between the beneficiaries and the
Commission, except if provided otherwise in the Agreement, and, in particular, the
coordinator :
(i) must immediately inform the Commission:
- of any change in the name, address, legal representative of any of the beneficiaries
or of their affiliated entities;
- of any change in the legal, financial, technical, organisational or ownership
situation of any of the beneficiaries or of their affiliated entities;
- of any events or circumstances likely to affect or delay the implementation of the
action, of which the coordinator is aware.
(ii) is responsible for supplying all documents and information required under the
Agreement to the Commission, except if provided otherwise in the Agreement;
where information is required from the other beneficiaries, the coordinator is
responsible for obtaining and verifying this information before passing it on to the
Commission;
29
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
(c) must make the appropriate arrangements for providing any financial guarantees required
under the Agreement;
(d) must establish the requests for payment in accordance with the Agreement;
(e) where it is designated as the sole recipient of payments on behalf of all of the
beneficiaries, must ensure that all the appropriate payments are made to the other
beneficiaries without unjustified delay;
(f) is responsible for providing all the necessary documents in the event of checks and
audits initiated before the payment of the balance, and in the event of evaluation in
accordance with Article 11.27.
The coordinator may not subcontract any part of its tasks to the other beneficiaries or to any
other party.
ARTICLE II.3 - COMMUNICATIONS BETWEEN THE PARTIES
11.3.1 Form and means of communications
Any communication relating to the Agreement or to its implementation must:
(a) be made in writing (in paper or electronic form),
(b) bear the number of the Agreement and
(c) be made using the communication details identified in Article 1.7.
If a party requests written confirmation of an electronic communication within a reasonable
time, the sender must provide an original signed paper version of the communication as soon
as possible.
11.3.2 Date of communications
Any communication is considered to have been made when the receiving party receives it,
unless the agreement refers to the date when the communication was sent.
E-mail is considered to have been received by the receiving party on the day of dispatch of
that e-mail, provided that it is sent to the e-mail address indicated in Article 1.7. The sending
party must be able to prove the date of dispatch. In case of non-delivery report, the sending
party must make every effort to ensure the actual receipt of the communication by the other
party by e-mail or mail. In such a case, the sending party is not held in breach of its obligation
to send such communication within a specified deadline.
Mail sent to the Commission using the postal or courier services is considered to have been
received by the Commission on the date on which it is registered by the department identified
in Article 1.7.2.
Formal notifications are considered to have been received by the receiving party on the date
of receipt indicated in the proof received by the sending party that the message was delivered
to the specified recipient.
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
ARTICLE II.4 - LIABILITY FOR DAMAGES
11.4.1 The Commission may not be held liable for any damage caused or sustained by any of
the beneficiaries, including any damage caused to third parties as a consequence of or
during the implementation of the action.
11.4.2 Except in cases of force majeure, the beneficiaries must compensate the Commission
for any damage it sustains as a result of the implementation of the action or because
the action was not implemented in full compliance with the Agreement.
ARTICLE IL5 - CONFLICT OF INTERESTS
11.5.1 The beneficiaries must take all necessary measures to prevent any situation of conflict
of interests.
11.5.2 The beneficiaries must inform the Commission without delay of any situation
constituting or likely to lead to a conflict of interests. They must take immediately all
the necessary steps to rectify this situation.
The Commission may verify that the measures taken are appropriate and may require
additional measures to be taken by a specified deadline.
ARTICLE II.6 - CONFIDENTIALITY
11.6.1 During implementation of the action and for five years after the payment of the
balance, the parties must treat with confidentiality any confidential information and
documents.
11.6.2 The parties may not use confidential information and documents for any reason other
than fulfilling their obligations under the Agreement without the prior written
agreement of the other party.
11.6.3 The confidentiality obligations do not apply if:
(a) the disclosing party agrees to release the other party from those obligations;
(b) the confidential information or documents become public through other means than in
breach of the confidentiality obligations;
(c) the disclosure of the confidential information or documents is required by law.
ARTICLE II.7 - PROCESSING OF PERSONAL DATA
II.7.1 Processing of personal data by the Commission
Any personal data included in the Agreement must be processed by the Commission in
accordance with Regulation (EC) No 45/20013.
3 Regulation (EC) No 45/2001 of the European Parliament and of the Council of 18 December
2000 on the protection of individuals with regard to the processing of personal data by the
Community institutions and bodies and on the free movement of such data.
31
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
Such data must be processed by the data controller identified in Article 1.7.1 solely for the
purposes of the implementation, management and monitoring of the Agreement or protecting
the financial interests of the EU, including checks, audits and investigations in accordance
with Article 11.27.
The beneficiaries have the right to access and correct their own personal data. For this
purpose, they must send any queries about the processing of their personal data to the data
controller identified in Article 1.7.1.
The beneficiaries may have recourse at any time to the European Data Protection Supervisor.
II.7.2 Processing of personal data by the beneficiaries
The beneficiaries shall process personal data under the Agreement in compliance with
applicable EU and national law on data protection (including authorisations or notification
requirements).
The beneficiaries may grant their personnel access only to data that is strictly necessary for
implementing, managing and monitoring the Agreement.
The beneficiaries must adopt appropriate technical and organisational security measures
having regard to the risks inherent in the processing and to the nature of the personal data
concerned, in order to:
(a) prevent any unauthorised person from gaining access to computer systems processing
personal data, and especially:
(i) unauthorised reading, copying, alteration or removal of storage media;
(ii) unauthorised data input as well as any unauthorised disclosure, alteration or
erasure of stored personal data;
(iii) unauthorised use of data-processing systems by means of data transmission
facilities;
(b) ensure that authorised users of a data-processing system can access only the personal
data to which their access right refers;
(c) record which personal data have been communicated, when and to whom;
(d) ensure that personal data processed on behalf of third parties can be processed only in
the manner prescribed by the Commission;
(e) ensure that, during communication of personal data and transport of storage media, the
data cannot be read, copied or erased without authorisation;
(f) design their organisational structure in such a way that it meets data protection
requirements.
ARTICLE II.8 - VISIBILITY OF UNION FUNDING
II.8.1 Information on Union funding and use of European Union emblem
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
Unless the Commission requests or agrees otherwise, any communication or publication
related to the action, made by the beneficiaries jointly or individually, including at
conferences, seminars or in any information or promotional materials (such as brochures,
leaflets, posters, presentations, in electronic form, etc.), must:
(a) indicate that the action has received funding from the Union and
(b) display the European Union emblem.
When displayed in association with another logo, the European Union emblem must have
appropriate prominence.
The obligation to display the European Union emblem does not confer to the beneficiaries a
right of exclusive use. The beneficiaries may not appropriate the European Union emblem or
any similar trademark or logo, either by registration or by any other means.
For the purposes of the first, second and third subparagraphs and under the conditions
specified therein, the beneficiaries may use the European Union emblem without first
obtaining permission from the Commission.
II.8.2 Disclaimers excluding Commission responsibility
Any communication or publication related to the action, made by the beneficiaries jointly or
individually in any form and using any means, must indicate:
(a) that it reflects only the author’s view; and
(b) that the Commission is not responsible for any use that may be made of the
information it contains.
ARTICLE II.9- PRE-EXISTING RIGHTS AND OWNERSHIP AND USE OF THE
RESULTS (INCLUDING INTELLECTUAL AND INDUSTRIAL PROPERTY
RIGHTS)
11.9.1 Ownership of the results by the beneficiaries
Unless stipulated otherwise in the Agreement, the beneficiaries retain ownership of the results
of the action, including industrial and intellectual property rights, and of the reports and other
documents relating to it.
11.9.2 Pre-existing rights
On written request of the Commission, specifying which of the results the Commission
intends to use, the beneficiaries must:
(a) establish a list specifying all pre-existing rights included in those results and
(b) provide this list to the Commission at the latest with the request for payment of the
balance.
The beneficiaries must ensure that they or their affiliated entities have all the rights to use any
pre-existing rights during the implementation of the Agreement.
11.9.3 Rights of use of the results and of pre-existing rights by the Union
33
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
The beneficiaries grant the Union the following rights to use the results of the action:
(a) use for its own purposes, and in particular, making available to persons working for the
Commission, other Union institutions, agencies and bodies and to Member States’
institutions, as well as, copying and reproducing in whole or in part and in unlimited
number of copies;
(b) reproduction: the right to authorise direct or indirect, temporary or permanent
reproduction of the results by any means (mechanical, digital or other) and in any form,
in whole or in part;
(c) communication to the public: the right to authorise any display performance or
communication to the public, by wire or wireless means, including the making available
to the public of the results in such a way that members of the public may access them
from a place and at a time individually chosen by them; this right also includes the
communication and broadcasting by cable or by satellite;
(d) distribution: the right to authorise any form of distribution of results or copies of the
results to the public;
(e) adaptation: the right to modify the results;
(f) translation;
(g) the right to store and archive the results in line with the document management rules
applicable to the Commission, including digitisation or converting the format for
preservation or new use purposes;
(h) where the results are documents, the right to authorise the reuse of the documents in
conformity with the Commission Decision of 12 December 2011 on the reuse of
Commission documents (2011/833/EU), to the extent it is applicable and the documents
fall within its scope and are not excluded by any of its provisions; for the sake of this
provision, "reuse" and "document" have the meaning given to it by this Decision.
The above rights of use may be further specified in the Special Conditions.
Additional rights of use for the Union may be provided for in the Special Conditions.
The beneficiaries must ensure that the Union has the right to use any pre-existing rights
included in the results of the action. Unless specified otherwise in the Special Conditions, the
pre-existing rights must be used for the same purposes and under the same conditions as
applicable to the rights of use of the results of the action.
Information about the copyright owner must be inserted when the result is divulged by the
Union. The copyright information must read: ‘© - year - name of the copyright owner. All
rights reserved. Licenced to the European Union under conditions.’.
Granting rights of use to the Commission does not affect its confidentiality obligations under
Article II.6 nor the obligation of the beneficiaries under Article II.3.1.
34
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
ARTICLE 11.10 - AWARD OF CONTRACTS NECESSARY FOR THE
IMPLEMENTATION OF THE ACTION
11.10.1 Where the implementation of the action requires the procurement of goods, works or
services, the beneficiaries must award the contract to the tender offering best value for
money or, as appropriate, to the tender offering the lowest price. In doing so, they
must avoid any conflict of interests.
The beneficiaries must ensure that the Commission, the European Court of Auditors
and the European Anti-Fraud Office (OLAF) can exercise their rights under Article
11.27 also towards their contractors.
11.10.2 Beneficiaries that are ‘contracting authorities’ within the meaning of Directive
2004/18/EC4 or ‘contracting entities’ within the meaning of Directive 2004/17/EC5
must comply with the applicable national public procurement rules.
The beneficiaries must ensure that the conditions applicable to them under Articles
II.4, II.5, II.6 and II.9 are also applicable to the contractor.
II. 10.3 The beneficiaries remain solely responsible for carrying out the action and for
compliance with the provisions of the Agreement.
II.10.4. If the beneficiaries breach their obligations under Article 11.10.1 the costs related to
the contract concerned are considered ineligible in accordance with Article II. 19.2
(c),_(d) and (e).
If the beneficiaries breach their obligations under Article II. 10.2 the grant may be
reduced in accordance with Article II.25.4.
ARTICLE 11.11 - SUBCONTRACTING OF TASKS FORMING PART OF THE
ACTION
II.ll.l Beneficiaries may subcontract tasks forming part of the action, provided that, in
addition to the conditions specified in Article 11.10, the following conditions are
complied with:
(a) subcontracting does not cover core tasks of the action;
(b) recourse to subcontracting is justified having regard to the nature of the action
and what is necessary for its implementation;
(c) the estimated costs of the subcontracting are clearly identifiable in the estimated
budget set out in Annex III;
(d) any recourse to subcontracting, if not provided for in Annex I, is communicated
by the coordinator and approved by the Commission. Such an approval may be
given by the Commission:
4 Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of
procedures for the award of public work contracts, public supply contracts and public service contracts
5 Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the
procurement procedures of entities operating in the water, energy, transport and postal services sectors
35
Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016
(i) before any recourse to subcontracting, if the beneficiaries request an
amendment in accordance with Article 11.13 or
(ii) after recourse to subcontracting if it:
- is specifically justified in the interim or final technical report referred to in
Articles 1.4.3 and 1.4.4 and
- does not entail changes to the Agreement which would call into question
the decision awarding the grant or breach the principle of equal treatment of
applicants;
(e) the beneficiaries ensure that the conditions applicable to them under Article II. 8
are also applicable to the subcontractor.
11.11.2 If the beneficiaries breach their obligations under Article ILI 1.1 (a), (b), (c) or (d), the
costs related to the contract concerned are considered ineligible in accordance with
Article II. 19.2 (f).
If the beneficiaries breach their obligation under Article II. 11.1 (e) the grant may be
reduced in accordance with Article II.25.4.
ARTICLE 11.12 - FINANCIAL SUPPORT TO THIRD PARTIES
II. 12.1 Where the implementation of the action requires giving financial support to third
parties, the beneficiaries must give such financial support in accordance with the
conditions specified in Annex I, which must at least contain:
(a) the maximum amount of financial support; This amount may not exceed EUR 60 000
for each third party except where the financial support is the primary aim of the action
as specified in Annex I;
(b) the criteria for determining the exact amount of the financial support;
(c) the different types of activity that may receive financial support, on the basis of a fixed
list;
(d) the definition of the persons or categories of persons which may receive financial
support;
(e) the criteria for giving the financial support.
11.12.2 As an exception to Article II. 12.1, in case the financial support takes the form of a
prize, the beneficiaries must give such financial support in accordance with the
conditions specified in Annex I, which must at least contain:
(a) the conditions for participation;
(b) the award criteria;
(c) the amount of the prize;
(d) the payment arrangements.
36
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
11.12.3 The beneficiaries must ensure that the conditions applicable to them under Articles
II.4, II.5, II.6, II.8, II.9 and 11.27 are also applicable to the third parties receiving
financial support.
ARTICLE 11.13 - AMENDMENTS TO THE AGREEMENT
Í1.13.1 Any amendment to the Agreement must be made in writing.
II.13.2 An amendment may not have the purpose or the effect of making changes to the
Agreement which would call into question the decision awarding the grant or be
contrary to the equal treatment of applicants.
II. 13.3 Any request for amendment must:
(a) be duly justified
(b) be accompanied by appropriate supporting documents and
(c) be sent to the other party in due time before it is due to take effect, and in any case one
month before the end of the implementation period.
Point (c) does not apply in cases duly substantiated by the party requesting the amendment if
the other party agrees.
11.13.4 A request for amendment on behalf of the beneficiaries must be submitted by the
coordinator. If a change of coordinator is requested without its agreement, the
request must be submitted by all other beneficiaries and must be accompanied by the
opinion of the coordinator or proof that this opinion has been requested in writing.
11.13.5 Amendments enter into force on the date on which the last party signs or on the date
of approval of the request for amendment.
Amendments take effect on a date agreed by the parties or, in the absence of such an
agreed date, on the date on which the amendment enters into force.
ARTICLE 11.14 - ASSIGNMENT OF CLAIMS FOR PAYMENTS TO THIRD
PARTIES
11.14.1 The beneficiaries may not assign any of their claims for payment against the
Commission to any third party, except if approved by the Commission on the basis of
a reasoned, written request by the coordinator made on behalf of the beneficiaries.
If the Commission has not accepted the assignment or the terms of it are not
observed, the assignment has no effect on it.
11.14.2 In no circumstances may an assignment release the beneficiaries from their
obligations towards the Commission.
ARTICLE 11.15 - FORCE MAJEURE
H.15.1 A party faced with force majeure must send a formal notification to the other party
without delay, stating the nature of the situation or of the event, its likely duration
and foreseeable effects.
37
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
11.15.2 The parties must take the necessary measures to limit any damage due to force
majeure. They must do their best to resume the implementation of the action as soon
as possible.
11.15.3 The party faced with force majeure may not be considered in breach of its
obligations under the Agreement if it has been prevented from fulfilling them by
force majeure.
ARTICLE 11.16 - SUSPENSION OF THE IMPLEMENTATION OF THE ACTION
IL16.1 Suspension of the implementation by the beneficiaries
The coordinator, on behalf of the beneficiaries, may suspend the implementation of the action
or any part of it, if exceptional circumstances make such implementation impossible or
excessively difficult, in particular in the event offorce majeure.
The coordinator must immediately inform the Commission stating:
(a) the reasons for suspension including details about the date or period when the
exceptional circumstances occurred; and
(b) the expected date of resumption.
Once the circumstances allow resuming the implementation of the action the coordinator must
inform the Commission immediately and present a request for amendment of the Agreement
as provided for in Article II. 16.3. This obligation does not apply if the Agreement or the
participation of a beneficiary is terminated in accordance with Articles II. 17.1, II. 17.2 or
points (c) or (d) of Article II.17.3.1.
II.16.2Suspension of the implementation by the Commission
II.16.2.1 Grounds for suspension
The Commission may suspend the implementation of the action or any part thereof:
(a) if the Commission has evidence that a beneficiary has committed substantial errors,
irregularities or fraud in the award procedure or in the implementation of the
Agreement or if a beneficiary fails to comply with its obligations under the
Agreement;
(b) if the Commission has evidence that a beneficiary has committed, in other grants
funded by the Union or the European Atomic Energy Community (‘Euratom’)
awarded to the beneficiary under similar conditions, systemic or recurrent errors,
irregularities, fraud or serious breach of obligations that have a material impact on
this grant; or
(c) if the Commission suspects substantial errors, irregularities, fraud or breach of
obligations committed by a beneficiary in the award procedure or in the
implementation of the Agreement and needs to verify whether they have actually
occurred.
H.16.2.2 Procedure for suspension
38
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
Step 1 - Before suspending implementation of the action, the Commission must send a formal
notification to the coordinator:
(a) informing it of:
(i) its intention to suspend the implementation;
(ii) the reasons for suspension;
(iii) in the cases referred to in points (a) and (b) of Article II. 16.2.1, the necessary
conditions for resuming the implementation, and
(b) inviting it to submit observations within 30 calendar days of receiving the formal
notification.
Step 2- If the Commission does not receive observations or decides to pursue the procedure
despite the observations it has received, it must send a formal notification to the coordinator
informing it of:
(a) the suspension of the implementation;
(b) the reasons for suspension; and
(c) in the cases referred to in points (a) and (b) of Article II. 16.2.1, the final conditions for
resuming the implementation; or
(d) in the case referred to in point (c) of Article II. 16.2.1, the indicative date of
completion of the necessary verification.
The coordinator must immediately inform the other beneficiaries of the suspension. The
suspension takes effect five calendar days after the formal notification is received by the
coordinator or on a later date specified in the formal notification.
Otherwise, the Commission must send a formal notification to the coordinator informing it
that the suspension procedure is not continued.
11.16.2.3 Resuming the implementation
In order to resume the implementation, the beneficiaries must endeavour to meet the notified
conditions as soon as possible and must inform the Commission of any progress made.
If the conditions for resuming the implementation are met or the necessary verifications are
carried out, the Commission must send a formal notification to the coordinator:
(a) informing it that the conditions for lifting the suspension are met and
(b) inviting it to present a request for amendment of the Agreement as provided for in
Article II. 16.3. This obligation does not apply if the Agreement or the participation of
a beneficiary is terminated in accordance with Articles 11.17.1, II. 17.2 or points (c), (g)
or (h) of Article II. 17.3.1.
11.16.3 Effects of the suspension
If the implementation of the action can be resumed and the Agreement is not terminated, an
amendment to the Agreement must be made in accordance with Article 11.13 in order to:
(a) set the date on which the action is to be resumed;
39
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
(b) extend the duration of the action; and
(c) make other changes necessary to adapt the action to the new situation.
The suspension is lifted with effect from the resumption date set out in the amendment. This
date may be before the date on which the amendment enters into force.
Costs incurred during the period of suspension, for the implementation of the suspended
action or the suspended part of it, may not be reimbursed or covered by the grant.
Suspension of the action implementation does not affect the Commission’s right to terminate
the Agreement or participation of a beneficiary in accordance with Article II. 17.3, reduce the
grant or recover amounts unduly paid in accordance with Articles II.25.4 and 11.26.
Neither party may claim damages due to suspension by the other party.
ARTICLE 11.17 - TERMINATION OF THE AGEEMENT
II.17.1 Termination of the Agreement by the coordinator
The beneficiaries may terminate the Agreement.
The coordinator must send a formal notification of termination to the Commission, stating:
(a) the reasons for termination and
(b) the date on which the termination takes effect. This date must be set after the formal
notification.
If no reasons are given or if the Commission considers the reasons do not justify termination,
the Agreement is considered to have been terminated improperly.
The termination takes effect on the day specified in the formal notification.
II.17.2Termination of the participation of one or more beneficiaries by the
coordinator
The participation of one or more beneficiaries may be terminated by the coordinator, on
request of the beneficiary concerned or on behalf of the other beneficiaries.
The coordinator must send a formal notification of termination to the Commission and inform
the beneficiary concerned by termination.
If the coordinator’s participation is terminated without its agreement, the formal notification
must be submitted by another beneficiary (acting on behalf of the other beneficiaries).
The formal notification must include:
(a) the reasons for termination;
(b) the opinion of the beneficiary concerned by termination (or proof that this opinion has
been requested in writing);
(c) the date on which the termination takes effect. This date must be set after the formal
notification, and
40
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
(d) a request for amendment in accordance with Article 11.17.4.2(a).
If no reasons are given or if the Commission considers that the reasons do not justify
termination, the participation will be considered to have been terminated improperly.
The termination takes effect on the day specified in tht formal notification.
II. 17.3 Termination of the Agreement or the participation of one or more
beneficiaries by the Commission
II.17.3.1 Grounds for termination
The Commission may terminate the Agreement or the participation of any one or several
beneficiaries, if:
(a) a change to the beneficiary’s legal, financial, technical, organisational or ownership
situation is likely to affect the implementation of the Agreement substantially or calls
into question the decision to award the grant;
(b) following the termination of the participation of any one or several beneficiaries, the
necessary modifications to the Agreement would call into question the decision
awarding the grant or would result in unequal treatment of applicants;
(c) the beneficiaries do not implement the action as specified in Annex I or if a
beneficiary fails to comply with another substantial obligation incumbent on it under
the Agreement;
(d) the implementation of the action is prevented or suspended due to force majeure or
exceptional circumstances and either:
(i) resumption is impossible, or
(ii) the necessary changes to the Agreement would call into question the decision
awarding the grant or breach the principle of equal treatment of applicants;
(e) a beneficiary or any person that assumes unlimited liability for the debts of that
beneficiary is subject to any of the situations provided for in points (a) or (b) of Article
106 (1) of the Financial Regulation6;
(f) a beneficiary or any related person is subject to any of the situations provided for in
points (c), (d), (e) or (f) of Article 106 (1) or to Article 106 (2) of the Financial
Regulation;
(g) the Commission has evidence that a beneficiary or any related person have committed
substantial errors, irregularities or fraud in the award procedure or in the
implementation of the Agreement, including in case of submission of false
information or failure to provide required information;
(h) the Commission has evidence that a beneficiary has committed, in other Union or
Euratom grants awarded to it under similar conditions, systemic or recurrent errors,
irregularities, fraud or serious breach of obligations that have a material impact on
this grant, or
6 Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on
the financial rules applicable to the general budget of the Union
41
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
(i) a beneficiary does not request an amendment to the Agreement to withdraw the
participation of its affiliated entity which is in any of the situations provided for in
points (f), (g) or (h) after having been requested to do so by the Commission through a
formal notification.
II.17.3.2 Procedure for termination
Step 1- Before terminating the Agreement or participation of one or more beneficiaries, the
Commission must send a formal notification to the coordinator:
(a) informing it of:
(i) its intention to terminate;
(ii) the reasons for termination; and
(b) inviting it, within 45 calendar days of receiving the formal notification,:
(i) to submit observations on behalf of all beneficiaries and,
(ii) in case of point (c) of Article 11.17.3.1, to inform the Commission of the
measures to ensure compliance with the obligations under the
Agreement.
Step 2 > If the Commission does not receive observations or decides to pursue the procedure
despite the observations it has received, it will send a formal notification to the coordinator
informing it of the termination and the date on which it takes effect. The coordinator must
immediately inform the other beneficiaries of the termination.
Otherwise, the Commission must send a formal notification to the coordinator informing it
that the termination procedure is not continued.
The termination takes effect:
(a) for terminations under points (a), (b), (c) and (e) of Article II. 17.3.1: on the day
specified in the formal notification of termination referred to in the second sub
paragraph (Step 2);
(b) for terminations under points (d), (f), (g), (h) and (i) of Article II. 17.3.1: on the day
after the formal notification of termination referred to in the second sub-paragraph
(Step 2) is received by the coordinator.
II. 17.4 Effects of termination
II.17.4.1 For termination of the Agreement:
Within 60 calendar days from the day on which the termination takes effect, the coordinator
must submit a request for payment of the balance in accordance with Article 1.4.4.
If the Commission does not receive the request for payment of the balance within the above
deadline, only costs which are included in an approved technical report and, where relevant,
in an approved financial statement, are reimbursed or covered by the grant.
42
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
If the Agreement is terminateci by the Commission for breach of the obligation to submit the
request for payment, the coordinator may not submit any request for payment after
termination. In that case the second subparagraph applies,
The Commission calculates the final grant amount as referred to in Article 11.25 and the
balance as referred to in Article 1.5.4 on the basis of the reports submitted. Only costs
incurred until termination takes effect are reimbursed or covered by the grant. Costs relating
to contracts due for execution only after termination are not taken into account.
The Commission may reduce the grant in accordance with Article II.25.4. in case of:
(a) improper termination of the Agreement by the coordinator within the meaning of
Article II. 17.1; or
(b) termination of the Agreement by the Commission on the grounds set out in points (c),
(f), (g), (h) and (i) of Article II.17.3.1.
Neither party may claim damages due to termination of the Agreement by the other party.
After termination, the beneficiaries’ obligations, in particular those under Articles 1.4, II.6,
II. 8, II.9, 11.14, 11.27 and any additional provisions on the use of the results as set out in the
Special Conditions, continue to apply.
II.17.4.2 For termination of the participation of one or more beneficiaries:
a) The coordinator must submit a request for amendment including:
(i) a proposal for reallocation of the tasks of the beneficiary or beneficiaries concerned
by termination and,
(ii) if necessary, the addition of one or more new beneficiaries to succeed the
beneficiary or beneficiaries concerned in all their rights and obligations under the
Agreement.
In case of termination by the Commission, the request must be submitted within 60 calendar
days from the day on which the termination takes effect.
In case of termination by the coordinator, the request must be included in the formal
notification of termination referred to in Article II. 17.2.
If termination takes effect after the end of the implementation period, no request for
amendment must be included, unless the beneficiary concerned is the coordinator. In this
case, the request for amendment must propose a new coordinator.
If the request for amendment is rejected by the Commission, the Agreement may be
terminated according to Article II. 17.3.1 (b). The request for amendment may be rejected if it
calls into question the decision awarding the grant or breaches the principle of equal treatment
of applicants
b) The beneficiary concerned by termination must submit to the coordinator:
(i) a technical report and
43
Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016
(ii) a financial statement covering the period from the end of the last reporting period to
the date when termination takes effect.
This information must be included by the coordinator in the payment request for the next
reporting period.
Only costs incurred by the beneficiary concerned until termination takes effect are reimbursed
or covered by the grant. Costs relating to contracts due for execution only after termination
are not taken into account.
The Commission may reduce the grant in accordance with Article 11.25.4. in case of:
(a) improper termination of the participation of a beneficiary by the coordinator within the
meaning of Article II. 17.2 or
(b) termination of the participation of a beneficiary by the Commission on the grounds set
out in points (c), (f), (g), (h) or (i) of Article 11.17.3.1.
Neither party may claim damages due to termination by the other party.
After termination, the concerned beneficiary’s obligations, in particular those under Articles
I. 4, И.6, II.8, II.9,11.14,11.27 and any additional provisions on the use of the results as set out
in the Special Conditions, continue to apply.
ARTICLE 11.18 - APPLICABLE LAW, SETTLEMENT OF DISPUTES AND
ENFORCEABLE DECISION
II. 18.1 The Agreement is governed by the applicable Union law complemented, where
necessary, by the law of Belgium.
11.18.2 In accordance with Article 272 TFEU, the General Court or, on appeal, the Court of
Justice of the European Union has a sole jurisdiction to hear any dispute between the
Union and any beneficiary concerning the interpretation, application or validity of
the Agreement, if such dispute cannot be settled amicably.
11.18.3 In accordance with Article 299 TFEU, for the purposes of recoveries within the
meaning of Article 11.26, the Commission may adopt an enforceable decision to
impose pecuniary obligations on persons other than States.
An action may be brought against such decision before the General Court of the
European Union in accordance with Article 263 TFEU.
Д4
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
PART B - FINANCIAL PROVISIONS
ARTICLE 11.19 - ELIGIBLE COSTS
II.19.1 Conditions for the eligibility of costs
Eligible costs of the action are costs actually incurred by the beneficiary which meet the
following criteria:
(a) they are incurred within the implementation period, with the exception of costs
relating to the request for payment of the balance and the corresponding supporting
documents referred to in Article 1.4.4;
(b) they are indicated in the estimated budget of the action set out in Annex III;
(c) they are incurred in connection with the action as described in Annex I and are
necessary for its implementation;
(d) they are identifiable and verifiable, in particular being recorded in the accounting
records of the beneficiary and determined according to the applicable accounting
standards of the country where the beneficiary is established and with the usual cost
accounting practices of the beneficiary;
(e) they comply with the requirements of applicable tax and social legislation; and
(f) they are reasonable, justified, and comply with the principle of sound financial
management, in particular regarding economy and efficiency.
II.19.2Eligible direct costs
To be eligible, the direct cost of the action must comply with the conditions of eligibility set
out in Article II. 19.1.
In particular, the following categories of costs are eligible direct costs, provided that they
satisfy the conditions of eligibility set out in Article II. 19.1 as well as the following
conditions:
(a) the costs of personnel working under an employment contract with the beneficiary or an
equivalent appointing act and assigned to the action, provided that these costs are in line
with the beneficiary’s usual policy on remuneration.
Those costs include actual salaries plus social security contributions and other statutory
costs included in the remuneration. They may also comprise additional remunerations,
including payments on the basis of supplementary contracts regardless of the nature of
those contracts, provided that they are paid in a consistent manner whenever the same
kind of work or expertise is required, independently from the source of funding used;
The costs of natural persons working under a contract with the beneficiary other than an
employment contract or seconded to the beneficiary by a third party against payment
may be assimilated to such costs of personnel, provided that the following conditions
are fulfilled:
(i) the natural person works under the instructions of the beneficiary and,
unless otherwise agreed with the beneficiary, in the premises of the
beneficiary;
45
Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016
(ii) the result of the work belongs to the beneficiary; and
(iii) the costs are not significantly different from the costs of staff performing
similar tasks under an employment contract with the beneficiary;
(b) costs of travel and related subsistence allowances, provided that these costs are in line
with the beneficiary’s usual practices on travel;
(c) the depreciation costs of equipment or other assets (new or second-hand) as recorded in
the accounting statements of the beneficiary, provided that the asset:
(i) is written off in accordance with the international accounting standards and
the usual accounting practices of the beneficiary and
(ii) has been purchased in accordance with Article II. 10.1 if the purchase
occurred within the implementation period;
The costs of rental or lease of equipment or other assets are also eligible, provided that
these costs do not exceed the depreciation costs of similar equipment or assets and are
exclusive of any finance fee;
Only the portion of the equipment’s depreciation, rental or lease costs corresponding to
the implementation period and the rate of actual use for the purposes of the action may
be taken into account. By way of exception, the Special Conditions may provide for the
eligibility of the full cost of purchase of equipment, where justified by the nature of the
action and the context of the use of the equipment or assets;
(d) costs of consumables and supplies, provided that they:
(i) are purchased in accordance with Article II. 10.1 and
(ii) are directly assigned to the action·,
(e) costs arising directly from requirements imposed by the Agreement (dissemination of
information, specific evaluation of the action, audits, translations, reproduction),
including the costs of requested financial guarantees, provided that the corresponding
services are purchased in accordance with Article II. 10.1;
(f) costs entailed by subcontracts within the meaning of Article 11.11, provided that the
conditions laid down in Article II. 11.1 (a), (b), (c) and (d) are met;
(g) costs of financial support to third parties within the meaning of Article 11.12, provided
that the conditions laid down in that Article are met;
(h) duties, taxes and charges paid by the beneficiary, notably value added tax (VAT),
provided that they are included in eligible direct costs, and unless specified otherwise in
the Agreement.
II. 19.3 Eligible indirect costs
Agreement number: ECHO/SU B/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016
To be eligible, indirect costs of the action must represent a fair apportionment of the overall
overheads of the beneficiary and must comply with the conditions of eligibility set out in
Article II. 19.1.
Unless otherwise specified in the Article 1.3.2, eligible indirect costs must be declared on the
basis of a flat rate of 7% of the total eligible direct costs.
II.19.4 Ineligible costs
In addition to any other costs which do not fulfil the conditions set out in Article II. 19.1, the
following costs may not be considered eligible: .
(a) return on capital and dividends paid by a beneficiary;
(b) debt and debt service charges;
(c) provisions for losses or debts;
(d) interest owed;
(e) doubtful debts;
(f) exchange losses;
(g) costs of transfers from the Commission charged by the bank of a beneficiary;
(h) costs declared by the beneficiary in the framework of another action receiving a grant
financed from the Union budget (including grants awarded by a Member State and
financed from the Union budget and grants awarded by other bodies than the
Commission for the purpose of implementing the Union budget); in particular, indirect
costs may not be eligible under a grant for an action awarded to a beneficiary which
already receives an operating grant financed from the Union budget during the period
in question;
(i) contributions in kind from third parties;
(j) excessive or reckless expenditure;
(k) deductible VAT.
ARTICLE 11.20 - IDENTIFIABILITY AND VERIFIABILITY OF THE AMOUNTS
DECLARED
II.20.1 Declaring costs and contributions
The beneficiary must declare as eligible costs or requested contribution:
(a) for actual costs: the costs it actually incurred for the action·,
(b) for unit costs or unit contributions: the amount obtained by multiplying the amount
per unit specified in Article I.3.2(a)(ii) or (b) by the actual number of units used or
produced;
(c) for lump sum costs or lump sum contributions: the global amount specified in Article
I.3.2(a)(iii) or (c), subject to the proper implementation of the corresponding tasks or
part of the action as described in Annex I;
(d) for flat-rate costs or flat-rate contributions: the amount obtained by applying the flat
rate specified in Article I.3.2(a)(iv) or (d);
(e) for unit costs declared on the basis of the beneficiary’s usual cost accounting
practices: the amount obtained by multiplying the amount per unit calculated in
accordance with its usual cost accounting practices by the actual number of units used
or produced;
47
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
(f) for lump sum costs declared on the basis of the beneficiary’s usual cost accounting
practices: the global amount calculated in accordance with its usual cost accounting
practices, subject to the proper implementation of the corresponding tasks or part of
the action·,
(g) for flat-rate costs declared on the basis of the beneficiary’s usual cost accounting
practices: the amount obtained by applying the flat rate calculated in accordance with
its usual cost accounting practices.
II.20.2Records and other documentation to support the costs and contributions
declared
If requested to do so in the context of the checks or audits described in Article 11.27, the
beneficiary must provide:
(a) for actual costs: adequate supporting documents to prove the costs declared, such as
contracts, invoices and accounting records.
In addition, the beneficiary’s usual accounting and internal control procedures must
permit direct reconciliation of the amounts declared with the amounts recorded in its
accounting statements as well as with the amounts indicated in the supporting
documents;
(b) for unit costs or unit contributions: adequate supporting documents to prove the
number of units declared.
The beneficiary does not need to identify the actual eligible costs covered or to
provide supporting documents, notably accounting statements, to prove the amount
declared per unit;
(c) for lump sum costs or lump sum contributions: adequate supporting documents to
prove the proper implementation.
The beneficiary does not need to identify the actual eligible costs covered or to
provide supporting documents, notably accounting statements, to prove the amount
declared as lump sum;
(d) for flat-rate costs or flat-rate contributions: adequate supporting documents to prove
the eligible costs or requested contribution to which the flat rate applies.
The beneficiary does not need to identify the actual eligible costs covered or to
provide supporting documents, notably accounting statements, for the flat rate applied;
(e) for unit costs declared on the basis of the beneficiary’s usual cost accounting
practices: adequate supporting documents to prove the number of units declared;
(f) for lump sum costs declared on the basis of the beneficiary’s usual cost accounting
practices: adequate supporting documents to prove the proper implementation;
(g) for flat-rate costs declared on the basis of the beneficiary’s usual cost accounting
practices: adequate supporting documents to prove the eligible costs to which the flat
rate applies.
II.20.3 Conditions for compliance of the costs accounting practices
48
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
IL20.3.1 In the case of points (e), (f) and (g) of Article II.20.2, the beneficiary does not need
to identify the actual eligible costs covered, but it must ensure that the cost
accounting practices used for the purpose of declaring eligible costs are in
compliance with the following conditions:
(a) the cost accounting practices used constitute its usual cost accounting practices
and are applied in a consistent manner, based on objective criteria independent
from the source of funding;
(b) the costs declared can be directly reconciled with the amounts recorded in its
general accounts; and
(c) the categories of costs used for the purpose of determining the costs declared
are exclusive of any ineligible cost or costs covered by other forms of grant in
accordance with Article 1.3.2.
11.20.3.2 If the Special Conditions provide so, the beneficiary may submit to the Commission
a request for assessment of the compliance of its usual cost accounting practices. If
required by the Special Conditions, the request must be accompanied by a
certificate on the compliance of the cost accounting practices (‘certificate on the
compliance of the cost accounting practices’).
The certificate on the compliance of the cost accounting practices must be:
(a) produced by an approved auditor or, in case of public bodies, by a competent
and independent public officer and
(b) drawn up in accordance with Annex VIII.
The certificate must certify that the beneficiary’s cost accounting practices used for the
purpose of declaring eligible costs comply with the conditions laid down in the first
subparagraph and with the additional conditions which may be laid down in the Special
Conditions.
11.20.3.3 Where the Commission has confirmed that the usual cost accounting practices of
the beneficiary are in compliance, costs declared in application of these practices
may not be challenged ex post, if:
(a) the practices actually used comply with those approved by the Commission and
(b) the beneficiary did not conceal any information for the purpose of their
approval.
ARTICLE 11.21 - ELIGIBILITY OF COSTS OF ENTITIES AFFILIATED TO THE
BENEFICIARIES
Where the Special Conditions contain a provision on entities affiliated to the beneficiaries,
costs incurred by such an entity are eligible, if:
(a) they satisfy the same conditions under Articles 11.19 and 11.20 as apply to the
beneficiary, and
(b) the beneficiary the entity is affiliated to ensures that the conditions applicable to the
beneficiary under Articles II.4, II.5, II.6, II.8, ILIO, II. 11 and 11.27 are also applicable
to the entity.
49
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries modei agreement: 2016
ARTICLE 11.22 - BUDGET TRANSFERS
Beneficiaries are allowed to adjust the estimated budget set out in Annex III by transfers
between themselves and between the different budget categories, if the action is implemented
as described in Annex I. This adjustment does not require an amendment of the Agreement in
accordance with Article 11.13.
However, the beneficiaries may not add costs relating to subcontracts not provided for in
Annex 1, unless such additional subcontracts are approved in accordance with Article
II. 11.1(d).
As an exception to the first subparagraph, should beneficiaries want to modify the value of the
contribution that each of them is entitled to as referred to in point (c) of II.26.3, the
coordinator must request an amendment in accordance with Article 11.13.
The first three subparagraphs do not apply to amounts which, in accordance with Article
I. 3.2(a)(iii) or (c), take the form of lump sums.
ARTICLE 11.23 - NON COMPLIANCE WITH REPORTING OBLIGATIONS
The Commission may terminate the Agreement in accordance with Article 11.17.3.1(c) and
may reduce the grant in accordance with Article II.25.4 if the coordinator:
(a) did not submit a request for interim payment or payment of the balance accompanied
by the documents referred to in Articles 1.4.3 or 1.4.4 within 60 calendar days
following the end of the corresponding reporting period, and
(b) still fails to submit such a request within 60 calendar days following a written
reminder sent by the Commission.
ARTICLE 11.24 - SUSPENSION OF PAYMENTS AND OF TIME LIMIT FOR
PAYMENT
II. 24.1 Suspension of payments
II.24.1.1 Grounds for suspension
The Commission may at any moment suspend, in whole or in part, the pre-financing payment
and interim payments for one or more beneficiaries or the payment of the balance for all
beneficiaries:
(a) if the Commission has evidence that a beneficiary has committed substantial errors,
irregularities or fraud in the award procedure or in the implementation of the
Agreement or if a beneficiary fails to comply with its obligations under the
Agreement;
(b) if the Commission has evidence that a beneficiary has committed, in other grants
funded by the Union or the European Atomic Energy Community (‘Euratom’)
awarded to the beneficiary under similar conditions, systemic or recurrent errors,
irregularities, fraud or serious breach of obligations that have a material impact on
this grant; or
(c) if the Commission suspects substantial errors, irregularities, fraud or breach of
obligations committed by a beneficiary in the award procedure or in the
50
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
implementation of the Agreement and needs to verify whether they have actually
occurred.
11.24.1.2 Procedure for suspension
Step 1 - Before suspending payments, the Commission must send a formal notification to the
coordinator:
(a) informing it of:
(i) its intention to suspend payments,
(ii) the reasons for suspension
(iii) in the cases referred to in points (a) and (b) of Article 11.24.1.1, the necessary
conditions for resuming payments and
(b) inviting it to submit observations within 30 calendar days of receiving the formal
notification.
Step 2 - If the Commission does not receive observations or decides to pursue the procedure
despite the observations it has received, it must send a formal notification to the coordinator
informing it of:
(a) the suspension of payments;
(b) the reasons for suspension;
(c) in the cases referred to in points (a) and (b) of Article 11.24.1.1, the final conditions for
resuming the implementation;
(d) in the case referred to in point (c) of Article 11.24.1.1, the indicative date of
completion of the necessary verification.
The coordinator must immediately inform the other beneficiaries of the suspension. The
suspension takes effect on the day the formal notification of suspension (Step 2) is sent
by the Commission.
Otherwise, the Commission must send a formal notification to the coordinator informing it
that the suspension procedure is not continued.
11.24.1.3 Effects of suspension
During the period of suspension of payments the coordinator is not entitled to submit:
(a) any requests for payments and supporting documents referred to in Articles 1.4.2,1.4.3
and 1.4.4 or,
(b) where the suspension concerns the pre-financing payments or interim payments for
one or several beneficiaries only, any requests for payments and supporting documents
relating to the participation of the concerned beneficiary or beneficiaries in the action.
The corresponding requests for payments and supporting documents may be submitted as
soon as possible after resumption of payments or may be included in the first request for
payment due following resumption of payments in accordance with the schedule laid down in
Article 1.4.1.
51
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
The suspension of payments does not affect the right of the coordinator to suspend the
implementation of the action in accordance with Article II. 16.1 or to terminate the Agreement
or the participation of a beneficiary in accordance with Article II. 17.1 and Article II. 17.2.
11.24.1.4 Resuming payments
In order to resume payments, the beneficiaries must endeavour to meet the notified conditions
as soon as possible and must inform the Commission of any progress made.
If the conditions for resuming payments are met the suspension will be lifted. The
Commission will send a formal notification to the coordinator.
11.24.2 Suspension of the time limit for payments
ĪI.24.2.1 The Commission may at any moment suspend the time limit for payment specified
in Articles 1.5.2, 1.5.3 and 1.5.4 if a request for payment cannot be approved
because:
(a) it does not comply with the provisions of the Agreement, or
(b) the appropriate supporting documents have not been produced, or
(c) there is a doubt about the eligibility of the costs declared in the financial statements
and additional checks, reviews, audits or investigations are necessary.
11.24.2.2 The Commission must send a formal notification to the coordinator informing it of:
(a) the suspension and
(b) the reasons for the suspension.
The suspension takes effect on the day the formal notification is sent by the Commission.
11.24.2.3 If the conditions for suspending the payment deadline are no longer met, the
suspension will be lifted and the remaining period will resume.
If the suspension exceeds two months, the coordinator may request the Commission if the
suspension will continue.
If the payment deadline has been suspended due to the non-compliance of the technical
reports or financial statements with the Agreement and the revised report or statement is not
submitted or was submitted but is also rejected, the Commission may terminate the
Agreement or the participation of the beneficiary in accordance with Article 11.17.3.1(c), and
reduce the grant in accordance with Article II.25.4.
ARTICLE 11.25 - CALCULATION OF THE FINAL AMOUNT OF THE GRANT
The final amount of the grant depends on the actual extent to which the action is implemented
in accordance with the Agreement.
The final amount of the grant is calculated by the Commission at the time of payment of the
balance in the following steps:
52
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
Step 1 - Application of the reimbursement rate to the eligible costs and addition of the
unit, flat-rate of lump sum contributions
Step 2 - Limit to the maximum amount of the grant
Step 3 - Reduction due to the no-profit rule
Step 4 - Reduction due to improper implementation or breach of other obligations
11.25.1 Step 1 - Application of the reimbursement rate to the eligible costs and
addition of the unit, flat-rate of lump sum contributions
This step is applied as follows:
(a) If, in accordance with Article 1.3.2(a), the grant takes the form of the reimbursement
of eligible costs, the reimbursement rate specified in that Article is applied to the
eligible costs of the action approved by the Commission for the corresponding
categories of costs, beneficiaries and affiliated entities;
(b) If, in accordance with Article 1.3.2(b), the grant takes the form of a unit contribution,
the unit contribution specified that Article is multiplied by the actual number of units
approved by the Commission for the corresponding beneficiaries and affiliated
entities;
(c) If, in accordance with Article 1.3.2(c), the grant takes the form of a lump sum
contribution, the lump sum specified in that Article for the corresponding beneficiaries
and affiliated entities is applied, subject to the approval by the Commission of the
proper implementation of the corresponding tasks or part of the action in accordance
with Annex I;
(d) If, in accordance with Article 1.3.2(d), the grant takes the form of a flat-rate
contribution, the flat rate referred to in that Article is applied to the eligible costs or to
the contribution approved by the Commission for the corresponding beneficiaries and
affiliated entities.
If Article 1.3.2 provides for a combination of different forms of grant, the amounts obtained
must be added.
11.25.2 Step 2 - Limit to the maximum amount of the grant
The total amount paid to the beneficiaries by the Commission may in no circumstances
exceed the maximum amount of the grant.
If the amount obtained following Step 1 is higher than this maximum amount, the final
amount of the grant is limited to the latter.
11.25.3 Step 3 - Reduction due to the no-profit rule
The grant may not produce a profit for the beneficiaries, unless specified otherwise in the
Special Conditions.
‘Profit’ means the surplus of the amount obtained following Steps 1 and 2 plus the total
receipts of the action, over the total eligible costs of the action.
53
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
The total eligible costs of the action are the consolidated total eligible costs approved by the
Commission for the categories of costs reimbursed in accordance with Article 1.3.2(a).
The total receipts of the action are the consolidated total receipts established, generated or
confirmed on the date on which the request for payment of the balance is drawn up by the
coordinator.
The following are considered receipts:
(a) income generated by the action·,
(b) financial contributions given by third parties to a beneficiary or to an affiliated entity,
if they are specifically assigned by the third parties to the financing of the eligible
costs of the action reimbursed by the Commission in accordance with Article
I.3.2(a)(i).
The following are however not considered receipts:
(a) financial contributions by third parties, if they may be used to cover costs other than
the eligible costs under the Agreement;
(b) financial contributions by third parties with no obligation to repay any amount unused
at the end of the implementation period.
If there is a profit, it will be deducted in proportion to the final rate of reimbursement of the
actual eligible costs of the action approved by the Commission for the categories of costs
referred to in Article I.3.2(a)(i) (as compared to the amount calculated following Steps 1 and
2).
II.25.4 Step 4 - Reduction due to improper implementation or breach of other
obligations
The Commission may reduce the maximum amount of the grant if the action has not been
implemented properly as described in Annex I (i.e. has not been implemented or has been
implemented poorly, partially or late), or if another obligation under the Agreement has been
breached.
The amount of the reduction will be proportionate to the improper implementation of the
action or to the seriousness of the breach.
Before reduction of the grant, the Commission must send a formal notification to the
coordinator:
(a) informing it of:
(i) its intention to reduce the maximum amount of the grant,
(ii) the amount it intends to reduce
(iii) the reasons for reduction; and
(b) inviting it to submit observations within 30 calendar days of receiving the formal
notification.
54
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
If the Commission does not receive any observations or decides to pursue reduction despite
the observations it has received, it will send a formal notification informing the coordinator of
its decision.
If the grant is reduced, the Commission must calculate the reduced grant amount by deducting
the amount of the reduction (calculated in proportion to the improper implementation of the
action or to the seriousness of the breach of obligations) from the maximum amount of the
grant.
The final amount of the grant will be the lower of the following two:
(a) the amount obtained following Steps 1 to 3 or
(b) the reduced grant amount following Step 4.
ARTICLE 11.26 - RECOVERY
11.26.1 Recovery at the time of payment of the balance
Where the payment of the balance takes the form of a recovery, the coordinator must repay
the Commission the amount in question, even if it has not been the final recipient of the
amount due.
II.26.2Recovery after payment of the balance
Where an amount is to be recovered in accordance with Articles 11.27.6, II.27.7 and 11.27.8,
the beneficiary concerned by the audit or OLAF findings must repay the Commission the
amount in question. Where the audit findings do not concern a specific beneficiary (or its
affiliated entities), the coordinator must repay the Commission the amount in question, even if
it has not been the final recipient of the amount due.
Each beneficiary is responsible for the repayment of any amount unduly paid by the
Commission as a contribution towards the costs incurred by its affiliated entities.
II.26.3 Recovery procedure
Before recovery, the Commission must send a formal notification to the beneficiary
concerned:
(a) informing it of its intention to recover the amount unduly paid;
(b) specifying the amount due and the reasons for recovery and
(c) inviting the beneficiary to make any observations within a specified period.
If no observations have been submitted or if, despite the observations submitted by the
beneficiary, the Commission decides to pursue the recovery procedure, the Commission may
confirm recovery by sending through а formal notification to the beneficiary a debit note,
specifying the terms and the date for payment.
If payment has not been made by the date specified in the debit note, the Commission will
recover the amount due:
55
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
(a) by offsetting it, without the beneficiary’s prior consent, against any amounts owed to
the beneficiary concerned by the Commission or an executive agency (from the Union
or the European Atomic Energy Community (Euratom) budget) (‘offsetting’);
In exceptional circumstances, to safeguard the financial interests of the Union, the
Commission may offset before the due date.
An action may be brought against such offsetting before the General Court of the
European Union in accordance with Article 263 TFEU;
(b) by drawing on the financial guarantee where provided for in accordance with Article
1.5.2 (‘drawing on the financial guarantee’);
(c) by holding the beneficiaries jointly and severally liable up to the maximum EU
contribution indicated, for each beneficiary, in the estimated budget (Annex III as last
amended);
(d) by taking legal action in accordance with Article II. 18.2 or with the Special
Conditions or by adopting an enforceable decision in accordance with Article II. 18.3.
II.26.4Interest on late payment
If payment is not made by the date in the debit note, the amount to be recovered will be
increased by late-payment interest at the rate set out in Article 1.5.5 from the day following
the date for payment in the debit note up to and including the date the Commission receives
full payment of the amount.
Partial payments must first be credited against charges and late-payment interest and then
against the principal.
II.26.5Bank charges
Bank charges incurred in the recovery process must be borne by the beneficiary concerned,
unless Directive 2007/64/EC7 applies.
ARTICLE 11.27 - CHECKS, AUDITS AND EVALUATION
II.27.1 Technical and financial checks, audits, interim and final evaluations
The Commission may, during the implementation of the action or afterwards, carry out
technical and financial checks and audits in relation to the proper implementation of the
action and compliance with the obligations under the Agreement. It may also check the
statutory records of the beneficiaries for the purpose of periodic assessments of lump sum,
unit cost or flat-rate amounts.
Information and documents provided in the framework of checks or audits must be treated on
a confidential basis.
7 Directive 2007/64/EC7 of the European Parliament and of the Council of 13 November 2007 on payment
services in the internal market amending Directives 97/7/EC, 2002/65/EC, 2005/60/EC and 2006/48/EC and
repealing Directive 97/5/EC
56
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
In addition, the Commission may carry out interim or final evaluation of the impact of the
action measured against the objective of the Union programme concerned.
Checks, audits or evaluations made by the Commission may be carried out either directly by
its own staff or by any other outside body authorised to do so on its behalf.
Such checks, audits or evaluations may be initiated during the implementation of the
Agreement and for a period of five years starting from the date of payment of the balance.
This period is limited to three years if the maximum amount of the grant is not more than
EUR 60 000.
The check, audit or evaluation procedures are considered to be initiated on the date of receipt
of the letter of the Commission announcing it.
If the audit is carried out on an affiliated entity, the beneficiary concerned must inform the
affiliated entity.
11.27.2 Duty to keep documents
The beneficiaries must keep all original documents, especially accounting and tax records,
stored on any appropriate medium, including digitalised originals when they are authorised by
their respective national law and under the conditions laid down therein, for a period of five
years starting from the date of payment of the balance.
This period is limited to three years if the maximum amount of the grant is not more than
EUR 60 000.
The periods set out in the first and second subparagraphs are longer if there are on-going
audits, appeals, litigation or pursuit of claims concerning the grant, including in the case
referred to in Article 11.27.7. In such cases, the beneficiaries must keep the documents until
such audits, appeals, litigation or pursuits of claims are closed.
11.27.3 Obligation to provide information
Where a check, audit or evaluation is initiated before the payment of the balance, the
coordinator must provide any information, including information in electronic format,
requested by the Commission or by any other outside body authorised by it. Where
appropriate, the Commission may request such information to be provided directly by a
beneficiary.
Where a check or audit is initiated after payment of the balance, such information must be
provided by the beneficiary concerned.
In case the beneficiary concerned does not comply with the obligations set out in the first and
second subparagraphs, the Commission may consider:
(a) any cost insufficiently substantiated by information provided by the beneficiary as
ineligible;
(b) any unit, lump sum or flat-rate contribution insufficiently substantiated by information
provided by the beneficiary as undue.
57
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
II.27.40n-the-spot visits
During an on-the-spot visit, the beneficiaries must allow Commission staff and outside
personnel authorised by the Commission to have access to the sites and premises where the
action is or was carried out, and to all the necessary information, including information in
electronic format.
They must ensure that the information is readily available at the moment of the on-the-spot
visit and that information requested is handed over in an appropriate form.
In case the beneficiary concerned refuses to provide access to the sites, premises and
information in accordance with the first and second subparagraphs, the Commission may
consider:
(a) any cost insufficiently substantiated by information provided by the beneficiary as
ineligible;
(b)any unit, lump sum or flat-rate contribution insufficiently substantiated by information
provided by the beneficiary as undue.
11.27.5 Contradictory audit procedure
On the basis of the findings made during the audit, a provisional report (‘draft audit report’)
must be drawn up. It must be sent by the Commission or its authorised representative to the
beneficiary concerned, which must have 30 calendar days from the date of receipt to submit
observations. The final report (‘final audit report’) must be sent to the beneficiary concerned
within 60 calendar days of expiry of the time limit for submission of observations.
11.27.6 Effects of audit findings
On the basis of the final audit findings, the Commission may take the measures which it
considers necessary, including recovery at the time of payment of the balance or after
payment of the balance of all or part of the payments made by it, in accordance with Article
11.26.
In the case of final audit findings made after the payment of the balance, the amount to be
recovered corresponds to the difference between the revised final amount of the grant,
determined in accordance with Article 11.25, and the total amount paid to the beneficiaries
under the Agreement for the implementation of the action.
11.27.7 Correction of systemic or recurrent errors, irregularities, fraud or breach of
obligations
II.27.7.1 The Commission may extend audit findings from other grants to this grant if:
(a) the beneficiary concerned is found, in other EU or Euratom grants awarded under
similar conditions, to have committed systemic or recurrent errors, irregularities,
fraud or breach of obligations that have a material impact on this grant and
(b) the final audit findings are sent to the beneficiary concerned through a formal
notification, together with the list of grants affected by the findings within the period
referred to in Article 11.27.1
58
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
The extension of findings may lead to:
(a) the rejection of costs as ineligible,
(b) reduction of the grant in accordance with Article 11.25.4,
(c) recovery of undue amounts in accordance with Article 11.26,
(d) suspension of payments in accordance with Article 11.24.1
(e) suspension of the action implementation in accordance with Article II. 16.2,
(f) termination in accordance with Article II. 17.3.
II.27.7.2 The Commission must send a formal notification to the beneficiary concerned
informing it of the systemic or recurrent errors and of its intention to extend the audit
findings, together with the list of grants affected.
(a) If the findings concern eligibility of costs the procedure is as follows:
Step 1 - The formal notification must include:
(i) an invitation to submit observations on the list of grants affected by the findings;
(ii) a request to submit revised financial statements for all grants affected;
(iii)where possible, the correction rate for extrapolation established by the Commission to
calculate the amounts to be rejected on the basis of the systemic or recurrent errors,
irregularities, fraud or breach of obligations, if the beneficiary concerned:
- would consider that the submission of revised financial statements is not possible or
practicable or
- would not submit revised financial statements.
Step 2 - The beneficiary concerned has 60 calendar days from receiving the formal
notification to submit observations and revised financial statements or to propose a duly
substantiated alternative correction method. This period may be extended by the Commission
in justified cases.
Step 3 - If the beneficiary concerned submits revised financial statements taking account of
the findings the Commission will define the amount to be corrected on the basis of those
revised statements.
If the beneficiary proposes an alternative correction method and the Commission accepts it,
the Commission must send a formal notification to the beneficiary concerned informing it of:
(i) the acceptability of the alternative method and
(ii) the revised eligible costs determined by applying this method.
Otherwise the Commission must send a formal notification to the beneficiary concerned
informing it of:
(i) the non-acceptability of the observations or the alternative method proposed and
(ii) the revised eligible costs determined by applying the extrapolation method initially
notified to the beneficiary.
59
Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016
If the systemic or recurrent errors, irregularities, fraud or breach of obligations are found
after the payment of the balance, the amount to be recovered corresponds to the difference
between:
(i) the revised final amount of the grant, determined in accordance with Article 11.25 on
the basis of the revised eligible costs declared by the beneficiary and approved by the
Commission or on the basis of the revised eligible costs after extrapolation, and
(ii) the total amount paid to the beneficiaries under the Agreement for the implementation
of the action·,
(b) If the findings concern improper implementation or a breach of another obligation the
procedure is as follows:
Step 1 - The formal notification must include:
(i) an invitation to submit observations on the list of grants affected by the findings and
(ii) the correction flat-rate the Commission intends to apply to the maximum amount of the
grant or to part of it according to the principle of proportionality.
Step 2 - The beneficiary concerned has 60 calendar days from receiving the formal
notification to submit observations or to propose a duly substantiated alternative flat-rate.
Step 3 - If the Commission accepts the alternative flat rate proposed by the beneficiary, it
must send a formal notification to the beneficiary concerned informing it of:
(i) the acceptability of the alternative flat-rate and
(ii) the corrected grant amount by applying this flat rate.
Otherwise the Commission must send a formal notification to the beneficiary concerned
informing it of:
(i) the non-acceptability of the observations or the alternative flat rate proposed and
(ii) the corrected grant amount by applying the flat rate initially notified to the beneficiary.
If the systemic or recurrent errors, irregularities, fraud or breach of obligations are found
after the payment of the balance, the amount to be recovered corresponds to the difference
between:
(i) the revised final amount of the grant after flat-rate correction and
(ii) the total amount paid to the beneficiaries under the Agreement for the implementation
of the action.
II.27.8 Checks and inspections by OLAF
The European Anti-Fraud Office (OLAF) has the same rights as the Commission, notably
right of access, for the purpose of checks and investigations.
60
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
By virtue of Council Regulation No 2185/968 and Regulation No 883/20139 OLAF may also
carry out on-the-spot checks and inspections in accordance with the procedures laid down by
Union law for the protection of the financial interests of the Union against fraud and other
irregularities.
Where appropriate, OLAF findings may lead to recovery by the Commission.
Moreover, findings arising from an OLAF investigation may lead to criminal prosecutions
under national law.
II.27.9 Checks and audits by the European Court of Auditors
The European Court of Auditors has the same rights as the Commission, notably right of
access, for the purpose of checks and audits.
8 Council Regulation (Euratom, EC) No 2185/96 of 11 November 1996 concerning on-the-spot checks and
inspections carried out by the Commission in order to protect the European Communities’ financial interests
against fraud and other irregularities
9 Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013
concerning investigations conducted by the European Anti-Fraud Office (OLAF),
61
Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016
ANNEX IV
MANDATE10 11
I, the undersigned,
[forename and surname of the legal representative of the future beneficiary signing this
mandate],
representing,
[full official name of the future beneficiary] [ACRONYM]
[official legal status orform]n
[official registration No}12
[full official address]
[VAT number],
(‘the beneficiary’),
(‘the action’)
hereby:
1. Mandate
[full official name of the coordinator] [ACRONYM]
[official legal status orform]
[official registration No]13
[full official address]
10 One original singed version of this Annex to be included for each beneficiary. (Not for the coordinator).
11 To be deleted or filled in according to the "Legal Entity" form
12 To be deleted or filled in according to the "Legal Entity" form
13 To be deleted or filled in according to the "Legal Entity" form
62
European Commission
DIRECTORATE-GENERAL
HUMANITARIAN AID AND CIVIL
PROTECTION - ECHO
Grant application forms
63
FORM FO
mm
BUDGET OF THE ACTION
% of eligible
Part A: Eligible cost categories Rate % € Part B: Financing Plan €
costs
Personnel 625.838 Requested EC contribution 784.406 75,00%
Travel and subsistence Contribution of the Coordinator
263.680 24.501
2,34%
Equipment Contribution of the Beneficiary (ies)
3.350 236.968
22,66%
Sub-contracting / External assistance 37.700 Other sources of funding 0 0,00%
Other direct costs 94.800 Expected direct revenues 0 0,00%
Indirect costs / overheads 2,00% 20.507
TOTAL ELIGIBLE COSTS 1.045.875 TOTAL 1.045.875
For information only
"In kind" contributions / costs not included in the
18.175
budget____________________________
Project Funding Breakdown Form F1
ЯИИВ шшншш
Coordinator's contribution
Coordinator n° Coordinator short name Total costs of the Coordinator's own Amount of EC
actions in € contribution in € contribution
requested in €
CO ICPD 98.003 24.501 73.502
Beneficiaries' contribution
Assicated Beneficiary short name Total costs of the Amount of EC
Beneficiary n° actions in € contribution in € contribution
requested in €
BE1 MoH-BE 269.850 67.463 202.388
BE2 DEMA 81.798 20.449 61.348
BE3 EHB 131.417 32.854 98.562
BE4 DGSCGC 94.858 23.714 71.143
BE5 JUH 155.482 38.870 116.611
BE6 ULEI 79.247 19.812 59.435
BE7 Mol-RO 68.565 17.141 51.424
BE8 ASSR 66.655 16.664 49.991
I TOTAL 236.968 710.904
í Co-financers contribution
Amount of co-
Co-financer name
TOTAL 0
Expected direct reveiTues
Description of direct revenue Amount
0
65
FormF2
«rtitÉiS esilili ."’Ä;
. . . .. Personnel
Λ 1) D E F G = E/F H I=Ü*H j I
Coordinator / Annual gross salary Annual number Number of
Type of Reference to
Beneficiary Category or Name of person Function in the project plus obligatory social of working Daily rate working days
contract Total Costs € Task ID/
reference assigned to the
charges days Action
project
ICPD Luigi D'Angelo Permanent Project director
129.060 220 587 20 11.733 5
staff
ICPD Paolo Vaccari Permanent Lead Steering Committee & Task 5 Project Management 220 196 60 11.775 5
43.175
staff
ICPD Federico Federighi Permanent Member of Steering Committee 16.554
91.046 220 414 40 5
staff
ASSR Renata Penazzi Permanent 13.093 225 58 185 10.765 3
staff
ASSR Marcel Sedlačko Permanent 225 85 145 12.373 3
19.200
staff
DEMA Nicolai Rauhe Kristinsen Permanent Lead Task 2: Logistics 210 348 31 10.799 2
73.152
staff
DEMA Carsten Bamberg Permanent 72.217 210 344 18 6.190 2
staff
DEMA Jan Gert Olsen Permanent 67.854 210 323 12 3.877 2
staff
DEMA Morten Helge Hansen Permanent 84.559 210 403 29 11.677 2
staff
DEMA Tais Krøger Ziethen Permanent 54.470 210 259 3 778 2
staff
DEMA Thorbjørn Nesjan Permanent 75.814 210 361 5 1.805 2
staff
DEMA Wasim Zafar Permanent 65.626 2101 313 9 2.813 2
staff
DGSCGC Frédéric Monard Permanent 84.000 210 400 40 16.0001 1
staff
DGSCGC Patrick Grignon Permanent Lead Task 1 : Governance 120.000 210 571 30 17.143 1
staff
SDIS 30 Isabelle Arnaud Permanent 80.000 210 381 30 11.429 1
staff
DGSCGC Christian Baroux Permanent 60.000 210 286 30 8.571 1
staff
Form F2
A B f D E F G = EfF H l = G*H j
Coordinator / Annual gross salary Annual number Number of
Type of working days Reference to
Beneficiary Category or Name of person Function in the project plus obligatory social of working Daily rate Total Costs € Task ID/
reference contract assigned to the
charges days Action
project
EHB Raido Paasma Permanent Lead Task 3: Healthcare
staff 68.567 210 327 48 15.672 3
EHB Üllar Kaljume Permanent
46.119 210 220 20 4.392 3
staff
EHB Andrus Remmelgas Permanent
staff 103.556 210 493 15 7.397 3
EHB Arkadi Popov Permanent
staff 105.943 210 504 23 11.603 3
EHB Viliem Nigu Permanent
47.485 210 226 23 5.201 3
staff
EHB Alo Rull Permanent
59.448 210 283 23 6.511 3
staff
EHB Ülle Uustalu Permanent
52.673 210 251 15 3.762 3
staff
EHB Mait Altmets Permanent
σ>
-«j
staff
58.600 210 279 15 4.186 3
EHB Andras Laugamets Permanent
58.664 210 279 25 6.984 3
staff
EHB Reno Rattasepp Permanent
22.636 210 108 25 2.695 3
staff
EHB Ujana Satalov Permanent
46.006 210 219 15 3.286 3
staff
EHB Perit Puust Permanent
22.398 210 107 15 1.600 3
staff
EHB Rein Vaheoja Permanent
34.113 210 162 10 1.624 3
staff
EHB Kaisa Soondra Permanent
43.106 210 205 23 4.721 3
staff
JUH Harm Bastian Harms Permanent Task 5 Project Management
97.308 209 466 58 27.004 5
staff
JUH Gerhard Jäkel Permanent Assistant Project Manager 29.426
58.852 210 280 105 5
staff
JUH Mathias Sitterlee Permanent Manager Budget and Finance
58.852 210 280 105 29.426 5
staff
JUH tbd Permanent Logistics; Staff, Training and Exercise 9 3.214 5
75.000 210 357
staff
JUH Oliver Rodewald Permanent Governance 3.643 5
85.000 210 405 9
staff
FormF2
Piillä
Personnel
Λ II C I) i-: F G=E/F j
I-G'π
Coordinator / Annual gross salary Annual number Number of
Type of Reference to
Beneficiary Category or Name of person Function in the project plus obligatory social of working Daily rate working days
contract Total Costs € Task ID ƒ
reference charges days assigned to the
Action
project
Mol-RO Christian Marius Boeriu Permanent
29.313 220 133 18 2.398 4
staff
Mol-RO Hadrian Borcea Permanent
31.033 220 141 25 3.526 I 4
staff
Mol-RO Paul - Bogdan Csillag Permanent
27.305 220 124 18 2.234 4
staff
Mol-RO Alexandru Bogdan Dinu Permanent
26.585 220 121 20 2.417 4
staff
Mol-RO Adina Maria Drahiciu Permanent
10.499 220 48 12 573 4
staff
Mol-RO Melinda Gal Permanent 14
23.919 220 109 1.522 4
staff
Mol-RO lon Cosmin Muntean Permanent 4
32.985 220 150 20 2.999
staff
Mol-RO Allna - Diana Muresan Permanent 13.764 220 14 876 4
63
staff
Mol-RO lonut Olaru-Barbilian Permanent 24.863 220 20 2.260 4
113
staff
Mol-RO Alina Petriča Permanent Lead Task 4: Staff, Training and Exercise 30 3.040 4
22.293 220 101
staff
Mol-RO Bogdan Solomon Permanent 26.617 220 121 20 2.420 4
staff
Mol-RO Emilia Tu ruez Permanent 18.345 220 18 1.501 4
83
staff
MoH-BE Tim Das Permanent Lead Task 5 Project Management 81.918 210 390 420 163.836 5
staff
MoH-BE Paul Pardon Permanent 66.524 210 317 6 1.901 5
staff
MoH-BE Erika Vlieghe Permanent 66.524 210 317 6 1.901 5
staff
MoH-BE Gino Claes Permanent 53.978 210| 257 26 6.683 5
staff
MoH-BE Geert Gijs Permanent Task 5 Project Management 50.223 210 239 120 28.699 5
staff
ULEI Thomas Neumuth Permanent IT Assistance for medical treatment and digital common 93.600' 210 446 158 70.423
staff patient record
1 .
- TOTAL 625.838
Form F3
^'
A c D F=D’E: G H=D"G l=F+H J
Coordinator / Number of Reference to
Beneficiary Travel unit Subsistence Subsistence
Journey from - to Reasons for travel people Travel costs Total costs € Task ID 1
reference costs unit costs costs
travelling Action
ICPD Rome EUMFH Kick-Off meeting 3 0,00 € 0 100,00 € 300 300 5
Rome-Brussels Kick-Off meeting with DG ECHO 1 500,00 € 500 100,00 € 100 600 5
Rome-Antwerp EUMFH Stakeholder workshop 4 500,00 € 2.000 295,00 € 1.180 3.180 5
Rome-Paris Workshop 1 on governance 2 500,00 € 1.000 200,00 € 400 1.400 1
Rome-Paris Workshop 2 on governance 2 500,00 € 1.000 200,00 € 400 1.400 1
Rome-Tallinn Workshop 1 on healthcare 2 500,00 € 1.000 200,00 € 400 1.400 3
Rome-Berlin EUMFH Steering committee 3 500,00 € 1.500 200,00 € 600 2.100 5
Rome-Tallinn Workshop 2 on healthcare 2 500,00 € 1.000 200,00 € 400 1.400 3
Rome-(Denmark) Workshop on logistics 2 500,00 € 1.000 475,00 € 950 1.950 2
Rome-Bratislava EUMFH Steering committee 3 500,00 € 1.500 200,00 € 600 2.100 5
Rome-Timisoara Workshop 1 on training 2 500,00 € 1.000 200,00 € 400 1.400 4
Rome-Targu Mures Workshop 2 on training 2 500,00 € 1.000 200,00 € 400 1.400 4
Rome-Antwerp EUMFH training 1 5 500,00 € 2.500 600,00 € 3.000 5.500 4
Rome-Antwerp EUMFH training 2 5 500,00 € 2.500 600,00 € 3.000 5.500 4
Rome-Leipzig EUMFH Steering committee 3 500,00 € 1.500 200,00 € 600 2.100 5
tba EUMFH Exercise 8 500,00 € 4.000 310,00 € 2.480 6.480 4
Rome EUMFH Steering committee 3 0,00 € 0 200,00 € 600 600 5
Rome-Geneva HNPW 1 500,00 € 500 1.000,00 € 1.000 1.500 5
Rome-Brussels Civil protection Forum 1 500,00 € 500 400,00 € 400 900 5
tba Ad-hoc meeting 1 1 500,00 € 500 160,00 € 160 660 5
tba Ad-hoc meeting 2 1 500,00 € 500 160,00 € 160 660 5
Form F3
A B c D E F=D*E G H=D'G l=F+H j
Coordinator / Number of Reference to
Travel unit Subsistence Subsistence
Beneficiary Journey from - to Reasons for travel people Travel costs Total costs € Task ID /
costs unit costs costs
reference travelling Action
ASSR Stará Lubovna-Rome EUMFH Kick-Off meeting 1 400,00 € 400 200,00 € 200 600 5
Stará Lubovna-Antwerp EUMFH Stakeholder workshop 2 400,00 € 800 295,00 € 590 1.390 5
Stará Lubovna-Paris Workshop 1 on governance 2 400,00 € 800 200,00 € 400 1.200 1
Stará Lubovna-Paris Workshop 2 on governance 2 400,00 € 800 200,00 € 400 1.200 1
Stará Lubovna-Tallinn Workshop 1 on healthcare 2 400,00 € 800 200,00 € 400 1.200 3
Stará Lubovna-Berlin EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5
Stará Lubovna-Tallinn Workshop 2 on healthcare 2 400,00 € 800 200,00 € 400 1.200 3
Stará Lubovna-(Denmark) Workshop on logistics 2 400,00 € 800 475,00 € 950 1.750 2
Stará Lubovna-Bratislava EUMFH Steering committee 1 150,00 € 150 200,00 € 200 350 5
Stará Lubovna-Timisoara Workshop 1 on training 2 500,00 € 1.000 200,00 € 400 1.400 4
Stará Lubovna-Targu Mures Workshop 2 on training 2 500,00 € 1.000 200,00 € 400 1.400 4
Stará Lubovna-Antwerp EUMFH training 1 5 400,00 € 2.000 600,00 € 3.000 5.000 4
Stará Lubovna-Antwerp EUMFH training 2 5 400,00 € 2.000 600,00 € 3.000 5.000 4
Stará Lubovna-Leipzig EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5
tba EUMFH Exercise 8 400,00 € 3.200 310,00 € 2.480 5.680 4
Stará Lubovna-Rome EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5
Form F3
A B c D E F=D*E G H=D*G l=F+H J
Coordinator / Number of Reference to
Beneficiary Travel unit Subsistence Subsistence
Journey from - to Reasons for travel people Travel costs Total costs € Task ID /
reference costs unit costs costs
travelling Action
DEMA Kopenhagen-Rome EUMFH Kick-Off meeting 1 350,00 € 350 200,00 € 200 550 5
Kopenhagen-Antwerp EUMFH Stakeholder workshop 3 350,00 € 1.050 295,00 € 885 1.935 5
Kopenhagen-Paris Workshop 1 on governance 2 350,00 € 700 200,00 € 400 1.100 1
Kopenhagen-Paris Workshop 2 on governance 2 350,00 € 700 200,00 € 400 1.100 1
Kopenhagen-Tallinn Workshop 1 on healthcare 2 550,00 € 1.100 200,00 € 400 1.500 3
Kopenhagen-Berlin EUMFH Steering committee 1 350,00 € 350 200,00 € 200 550 5
Kopenhagen-Tallinn Workshop 2 on healthcare 2 550,00 € 1.100 200,00 € 400 1.500 3
(Denmark) Workshop on logistics 2 0,00 € 0 475,00 € 950 950 2
Kopenhagen-Bratislava EUMFH Steering committee 1 550,00 € 550 200,00 € 200 750 5
Kopenhagen-Timisoara Workshop 1 on training 2 550,00 € 1.100 200,00 € 400 1.500 4
Kopenhagen-Targu Mures Workshop 2 on training 2 550,00 € 1.100 200,00 € 400 1.500 4
Kopenhagen-Antwerp EUMFH training 1 5 350,00 € 1.750 600,00 € 3.000 4.750 4
Kopenhagen-Antwerp EUMFH training 2 5 350,00 € 1.750 600,00 € 3.000 4.750 4
Kopenhagen-Leipzig EUMFH Steering committee 1 350,00 € 350 200,00 € 200 550 5
tba EUMFH Exercise 8 400,00 € 3.200 310,00 € 2.480 5.680 4
Kopenhagen-Rome EUMFH Steering committee 1 350,00 € 350 200,00 € 200 550 5
Form F3
A B
.... 1111 1 J
c D E F=D"E G H=D"G l=F+H
Coordinator/ Number of Reference to
Travel unit Subsistence Subsistence
Beneficiary Journey from - to Reasons for travel people Travel costs Total costs € Task ID /
costs unit costs costs
reference travelling Action
DGSCGC Paris-Rome EUMFH Kick-Off meeting 1 300,00 € 300 200,00 € 200 500 5
Paris-Antwerp EUMFH Stakeholder workshop 3 400,00 € 1.200 295,00 € 885 2.085 5
Paris Workshop 1 on governance 2 0,00 € 0 200,00 € 400 400 1
Paris Workshop 2 on governance 2 0,00 € 0 200,00 € 400 400 1
Paris-Tallinn Workshop 1 on healthcare 2 500,00 € 1.000 200,00 € 400 1.400 3
Paris-Berlin EUMFH Steering committee 1 300,00 € 300 200,00 € 200 500 5
Paris-Tallinn Workshop 2 on healthcare 2 500,00 € 1.000 200,00 € 400 1.400 3
Paris-(Denmark) Workshop on logistics 2 250,00 € 500 475,00 € 950 1.450 2
Paris-Bratislava EUMFH Steering committee 1 250,00 € 250 200,00 € 200 450 5
Paris-Timisoara Workshop 1 on training 2 800,00 € 1.600 200,00 € 400 2.000 4
Paris-Targu Mures Workshop 2 on training 2 550,00 € 1.100 200,00 € 400 1.500 4
Paris-Antwerp EUMFH training 1 5 250,00 € 1.250 600,00 € 3.000 4.250 4
Paris-Antwerp EUMFH training 2 5 250,00 € 1.250 600,00 € 3.000 4.250 4
Paris-Leipzig EUMFH Steering committee 1 250,00 € 250 200,00 € 200 450 5
tba EUMFH Exercise 8 350,00 € 2.800 310,00 € 2.480 5.280 4
Paris-Rome EUMFH Steering committee 1 300,00 € 300 200,00 € 200 500 5
Form F3
A B c D E F=D*F G H=D*G l=F+H J
Coordinator / Number of Reference to
Beneficiary Travel unit Subsistence Subsistence
Journey from - to Reasons for travel people Travel costs Total costs € Task ID /
costs unit costs costs
reference travelling Action
EHB Tallinn-Rome EUMFH Kick-Off meeting 1 480,00 € 480 200,00 € 200 680 5
Tallinn-Antwerp EUMFH Stakeholder workshop 3 550,00 € 1.650 295,00 € 885 2.535 5
Tallinn-Paris Workshop 1 on governance 2 480,00 € 960 200,00 € 400 1.360 1
Tallinn-Paris Workshop 2 on governance 2 480,00 € 960 200,00 € 400 1.360 1
Tallinn Workshop 1 on healthcare 2 0,00 € 0 200,00 € 400 400 3
Tallinn-Berlin EUMFH Steering committee 1 480,00 € 480 200,00 € 200 680 5
Tallinn Workshop 2 on healthcare 2 0,00 € 0 200,00 € 400 400 3
Tallinn-(Denmark) Workshop on logistics 2 480,00 € 960 475,00 € 950 1.910 2
Tallinn-Bratislava EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5
Tallinn-Timisoara Workshop 1 on training 2 500,00 € 1.000 200,00 € 400 1.400 4
Tallinn-Targu Mures Workshop 2 on training 2 500,00 € 1.000 200,00 € 400 1.400 4
Tallinn-Antwerp EUMFH training 1 5 500,00 € 2.500 600,00 € 3.000 5.500 4
Tallinn-Antwerp EUMFH training 2 5 500,00 € 2.500 600,00 € 3.000 5.500 4
Tallinn-Leipzig EUMFH Steering committee 1 480,00 € 480 200,00 € 200 680 5
tba EUMFH Exercise 8 500,00 € 4.000 310,00 € 2.480 6.480 4
Tallinn-Rome EUMFH Steering committee 1 480,00 € 480 200,00 € 200 680 5
Form F3
A B D E F=D*E 3 H=D'G l=F+H J
Coordinator / Number of Reference to
Travel unit Subsistence Subsistence
Beneficiary Journey from - to Reasons for travel people Travel costs Total costs € Task ID /
costs unit costs costs
reference travelling Action
JUH Hamburg-Rome EUMFH Kick-Off meeting 3 400,00 € 1.200 200,00 € 600 1.800 5
Hamburg-Brussels Kick-Off meeting with DG ECHO 1 500,00 € 500 100,00 € 100 600 5
Hamburg-Antwerp EUMFH Stakeholder workshop 4 500,00 € 2.000 295,00 € 1.180 3.180 5
Hamburg-Paris Workshop 1 on governance 2 400,00 € 800 200,00 € 400 1.200 1
Hamburg-Paris Workshop 2 on governance 2 400,00 € 800 200,00 € 400 1.200 1
Hamburg-Tallinn Workshop 1 on healthcare 2 550,00 € 1.100 200,00 € 400 1.500 3
Hamburg-Berlin EUMFH Steering committee 3 150,00 € 450 200,00 € 600 1.050 5
Hamburg-Tallinn Workshop 2 on healthcare 2 550,00 € 1.100 200,00 € 400 1.500 3
"sj
■ŕ» Berlin-(Denmark) Workshop on logistics 2 350,00 € 700 475,00 € 950 1.650 2
Hamburg-Bratislava EUMFH Steering committee 3 450,00 € 1.350 200,00 € 600 1.950 5
Hamburg-Timisoara Workshop 1 on training 2 550,00 € 1.100 200,00 € 400 1.500 4
Hamburg-Targu Mures Workshop 2 on training 2 550,00 € 1.100 200,00 € 400 1.500 4
Berlin-Antwerp EUMFH training 1 5 500,00 € 2.500 600,00 € 3.000 5.500 4
Berlin-Antwerp EUMFH training 2 5 500,00 € 2.500 600,00 € 3.000 5.500 4
Hamburg-Leipzig EUMFH Steering committee 3 100,00 € 300 200,00 € 600 900 5
tba EUMFH Exercise 8 500,00 € 4.000 310,00 € 2.480 6.480 4
Hamburg-Rome EUMFH Steering committee 3 400,00 € 1.200 200,00 € 600 1.800 5
Hamburg-Brussels Civil protection Forum 1 500,00 € 500 400,00 € 400 900 5
tba Ad-hoc meeting 1 1 400,00 € 400 160,00 € 160 560 5
tba Ad-hoc meeting 2 1 400,00 € 400 160,00 € 160 560 5
Hamburg-Brussels UCPM Modules Working Group 2 500,00 € 1.000 100,00 € 200 1.200 5
A B D E "" 11 j
c F=D'E G H=C*G l=F+H
Coordinator/ Number of Reference to
Beneficiary Travel unit Subsistence Subsistence
Journey from - to Reasons for travel people Travei costs Total costs € Task ID /
reference costs unit costs costs
travelling Action
Mol-RO Bukarest-Rome EUMFH Kick-Off meeting 1 400,00 € 400 200,00 € 200 600 5
Bukarest-Antwerp EUMFH Stakeholder workshop 3 400,00 € 1.200 295,00 € 885 2.085 5
Bukarest-Paris Workshop 1 on governance 2 400,00 € 800 200,00 € 400 1.200 1
Bukarest-Paris Workshop 2 on governance 2 400,00 € 800 200,00 € 400 1.200 1
Bukarest-Tallinn Workshop 1 on healthcare 2 450,00 € 900 200,00 € 400 1.300 3
Bukarest-Berlin EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5
Bukarest-Tallinn Workshop 2 on healthcare 2 450,00 € 900 200,00 € 400 1.300 3
Bukarest-(Denmark) Workshop on logistics 2 450,00 € 900 475,00 € 950 1.850 2
Bukarest-Bratislava EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5
Timisoara Workshop 1 on training 2 0,00 € 0 200,00 € 400 400 4
Targu Mures Workshop 2 on training 2 0,00 € 0 200,00 € 400 400 4
Bukarest-Antwerp EUMFH training 1 5 400,00 € 2.000 600,00 € 3.000 5.000 4
Bukarest-Antwerp EUMFH training 2 5 400,00 € 2.000 600,00 € 3.000 5.000 4
Bukarest-Leipzig EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5
tba EUMFH Exercise 8 400,00 € 3.200 310,00 € 2.480 5.680 4
Bukarest-Rome EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5
5
Form F3
A B c D E F=D"EE G H=D-G l=F+H , J
Coordinator / Number of Reference to
Travel unit Subsistence Subsistence
Beneficiary Journey from - to Reasons for travel people Travel costs Total costs € Task ID /
reference costs unit costs costs
travelling Action
MoH-BE Brussels-Rome EUMFH Kick-Off meeting 3 190,00 € 570 200,00 € 600 1.170 5
Brussels Kick-Off meeting with DG ECHO 1 0,00 € 0 100,00 € 100 100 5
Brussels-Antwerp EUMFH Stakeholder workshop 4 0,00 € 0 295,00 € 1.180 1.180 5
Brussels-Paris Workshop 1 on governance 2 280,00 € 560 200,00 € 400 960 1
Brussels-Paris Workshop 2 on governance 2 280,00 € 560 200,00 € 400 960 1
Brussels-Tallinn Workshop 1 on healthcare 2 380,00 € 760 200,00 € 400 1.160 3
Brussels-Berlin EUMFH Steering committee 3 180,00 € 540 200,00 € 600 1.140 5
Brussels-Tallinn Workshop 2 on healthcare 2 380,00 € 760 200,00 € 400 1.160 3
Brussels-(Denmark) Workshop on logistics 2 180,00 € 360 475,00 € 950 1.310 2
Brussels-Bratislava EUMFH Steering committee 3 90,00 € 270 200,00 € 600 870 5
Brussels-Timisoara Workshop 1 on training 2 330,00 € 660 200,00 € 400 1.060 4
Brussels-Targu Mures Workshop 2 on training 2 330,00 € 660 200,00 € 400 1.060 4
Brussels-Antwerp EUMFH training 1 5 0,00 € 0 600,00 € 3.000 3.000 4
Brussels-Antwerp EUMFH training 2 5 0,00 € 0 600,00 € 3.000 3.000 4
Brussels-Leipzig EUMFH Steering committee 3 150,00 € 450 200,00 € 600 1.050 5
tba EUMFH Exercise 8 350,00 € 2.800 310,00 € 2.480 5.280 4
Brussels-Rome EUMFH Steering committee 3 190,00 € 570 200,00 € 600 1.170 5
Brussels-Geneva HNPW 1 200,00 € 200 1.000,00 € 1.000 1.200 5
Brussels Civil protection Forum 1 0,00 € 0 100,00 € 100 100 5
tba Ad-hoc meeting 1 1 350,00 € 350 160,00 € 160 510 5
tba Ad-hoc meeting 2 1 350,00 € 350 160,00 € 160 510 5
Form F3
ro
C D E F=D*E G H=D*G l=F+H j
Coordinator / Number of Reference to
Travel unit Subsistence Subsistence
Beneficiary Journey from - to Reasons for travel people Travel costs Total costs € Task ID /
costs unit costs costs
reference travelling Action
ULEI Leipzig-Rome EUMFH Kick-Off meeting 1 400,00 € 400 200,00 € 200 600 5
Leipzig-Antwerp EUMFH Stakeholder workshop 1 500,00 € 500 295,00 € 295 795 5
Leipzig-Tallinn Workshop 1 on healthcare 1 450,00 € 450 200,00 € 200 650 3
Leipzig-Berlin EUMFH Steering committee 1 110,00 € 110 200,00 € 200 310 5
Leipzig-Tallinn Workshop 2 on healthcare 1 450,00 € 450 200,00 € 200 650 3
Leipzig-(Denmark) Workshop on logistics 1 350,00 € 350 475,00 € 475 825 2
Leipzig-Bratislava EUMFH Steering committee 1 450,00 € 450 200,00 € 200 650 5
Leipzig EUMFH Steering committee 1 0,00 € 0 200,00 € 200 200 5
tba EUMFH Exercise 1 400,00 € 400 310,00 € 310 710 4
Leipzig-Rome EUMFH Steerinq committee 1 400,00 € 400 200,00 € 200 600 5
' TOTAL 263.680
Form F4
A B C ■· D E F-D* E G
Coordinator / Reference to
Purchase Eligible
Beneficiary Supplier/ Procedure Description Rate % Task ID /
cost Costs €
reference Action
ICPD Tbd - through market Tablet for electronic patient record 450 100,00% 450 4
research (required quality
with the best price)
JUH Tbd - through market Tablet for electronic patient record 450 100,00% 450 4
research (required quality
with the best price)
MoH-BE Tbd - through market Tablet for electronic patient record 450 100,00% 450 4
research (required quality
with the best price)
MoH-BE Tbd - through market Notebook and printer 2.000 100,00% 2.000 5
research (required quality
with the best price)
' TOTAL 3.350
79
Form F5
тштж шшшшш ’
Subcontracting/Externai assistance
_____________________
Λ
________________________________________________________^
в C D E
Coordinator / Reference to
Beneficiary Provider/procedure Description of service subcontracted Total cost € Task ID /
reference Action
ICPD Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) 1.250 4
ICPD Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) 1.250 4
ASSR Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) 1.250 4
ASSR Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) ""-:':-::·:-::···:·':>:ΐ.25θ 4
DEMA Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) ·1'.250 4
DEMA Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) 1.250 4
DGSCGC Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) 1.250 4
DGSCGC Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) 1.250 4
EHB Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) 1.250 4
EHB Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) 1.250 4
JUH Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) 1.250 4
JUH Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) 1.250 4
JUH Karsten Christoph Llndenstromberg Trainer for training courses and medical advisor 4.200 4
Mol-RO Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) 1.250 4
Mol-RO Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) 1.250 4
MoH-BE Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) 1.250 4
MoH-BE Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) 4
MoH-BE Campus Vesta Training 3.500 4
MoH-BE International Disaster and Emergency Management Support (IDEMS) VZW Training and expertise 10.000 4
l TOTAL 37.700
Form F6
Qther direct costs
1 " 1 ........... . ... ■■■■■'■...
Tl
B D E G H
Coordinator /
Beneficiary Reference fo
Supplier/ Procedure Description Units type Units n° Unit costs Total costs €
Task ID / Action
reference
ICPD Flyerarlam.de Project flyer Piece 113 0,27 € 3i 5
ICPD Flyerarlam.de Layman's report Piece 112 0,45 € 5
ICPD tbd Project homepage Piece 1 200,00 € 20Q 5
ICPD tbd Project video Piece 1 1.000,00 € 1.000 5
ICPD tbd Transport trucks Piece 4 375,00 € 1.500 4
ICPD tbd Insurance 1 125,00 € 125 4
ICPD tbd Exercise disposables 1 435,00 € 435 4
ICPD tbd Exercise fuel 1 150,00 € 150 4
ICPD tbd Exercise communication 1 150,00 € 150 4
ICPD tbd Exercise maintenance and refurbishing 1 2.000,00 € 2.000 4
ICPD Tbd - through market research Personal protection equipment Piece 20 230,00 € 4.600 4
(required quality with the best
price)
ICPD Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 1 300,00 € 300 4
(required quality with the best
price)
Form F6
Other direct costs
A B C D e F G H
Coordinator /
Reference to
Beneficiary Supplier/ Procedure Description Units type Units n° Unit costs Total costs €
Task ID / Action
reference
ASSR Flyerarlam.de Project flyer Piece 111 0,27 € 30 5
ASSR Flyerarlam.de Layman's report Piece 111 0,45 € 5
ASSR tbd Project homepage Piece 1 200,00 € 200 5
ASSR tbd Project video Piece 1 1.000,00 € 1.000 4
ASSR tbd Transport trucks Piece 4 375,00 € 1.500 4
ASSR tbd Insurance 1 125,00 € 125 4
ASSR tbd Exercise disposables 1 435,00 € 435 4
ASSR tbd Exercise fuel 1 150,00 € 150 4
ASSR tbd Exercise communication 1 150,00 € ^:.тдаШ15о 4
ASSR tbd Exercise maintenance and refurbishing 1 2.000,00 € 2.000 4
ASSR Tbd - through market research Personal protection equipment Piece 20 230,00 € 4.600 4
(required quality with the best
price)
ASSR Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 1 300,00 € 300 4
(required quality with the best
price)
Form F6
E H
o
Tl
A в D G
Coordinator /
Beneficiary Supplier/ Procedure Reference to
Description Units type Units n° Unit costs Total costs €
Task ID / Action
reference
DEMA Flyerarlam.de Project flyer Piece 110 0,27 € ^>■4··-'.-№^30 5
DEMA Flyerarlam.de Layman's report Piece 111 0,45 € 50 5
DEMA tbd Project homepage Piece 1 200,00 € 5
DEMA tbd Project video Piece 1 1.000,00 € 5
DEMA tbd Transport trucks Piece 4 375,00 € 1.500 4
DEMA tbd Insurance 1 125,00 € 125 4
DEMA tbd Exercise disposables 1 435,00 € 435 4
DEMA tbd Exercise fuel 1 150,00 € 150 4
DEMA tbd Exercise communication 1 150,00 € 4
DEMA tbd Exercise maintenance and refurbishing 1 2.000,00 € 2.000 4
DEMA Tbd - through market research Personal protection equipment Piece 20 230,00 € 4.600 4
(required quality with the best
price)
DEMA Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 1 300,00 € 300 4
(required quality with the best
price)
Form F6
iláÉfii
1
a E F G S'
Coordinator /
Reference to
Beneficiary Supplier/ Procedure Description Units type Units n° Unit costs Total costs €
Task ID / Action
reference
DGSCGC Flyerarlam.de Project flyer Piece 111 0,27 € 30
DGSCGC Flyerarlam.de Layman's report Piece 111 0,45 € 50
DGSCGC tbd Project homepage Piece 200,00 € 200
DGSCGC tbd Project video Piece 1.000,00 € 1000
DGSCGC tbd Transport trucks Piece 375,00 € 1.500
DGSCGC tbd Insurance 125,00 € 125
DGSCGC tbd Exercise disposables 435,00 € 435
DGSCGC tbd Exercise fuel 150,00 € 150
DGSCGC tbd Exercise communication 150,00 € 150
DGSCGC tbd Exercise maintenance and refurbishing 2.000,00 € 2.000
DGSCGC Tbd - through market research Personal protection equipment Piece 20 230,00 € 4.600
(required quality with the best
price) _______ ________
DGSCGC Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 300,00 € 300
(required quality with the best
price) ____ ___
Form F6
Other direct costs
c
A в E F H
Coordinator /
Reference to
Beneficiary Supplier/ Procedure Description Units type Units n° Unit costs Total costs €
Task ID / Action
reference
EHB Flyerarlam.de Project flyer Piece 110 0,27 € 5
EHB Flyerarlam.de Layman's report Piece 111 0,45 € 5
EHB tbd Project homepage Piece 1 200,00 € ■'"^■■■^ľWí-200 5
EHB tbd Project video Piece 1 1.000,00 € 5
EHB tbd Transport trucks Piece 4 375,00 € 4
EHB tbd Insurance 1 125,00 € 125 4
EHB tbd Exercise disposables 1 435,00 € ^.■■^■^'..■435 4
EHB tbd Exercise fuel 1 150,00 € 4
EHB tbd Exercise communication 1 150,00 € 4
EHB tbd Exercise maintenance and refurbishing 1 2.000,00 € 2.000 4
EHB Tbd - through market research Personal protection equipment Piece 40 230,00 € 9.200 4
(required quality with the best
price)
EHB Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 1 300,00 € 300 4
(required quality with the best
price)
Form F6
B D E F G H
Coordinator /
Reference to
Beneficiary Supplier/ Procedure Description Units type Units n° Unit costs Total costs €
Task ID / Action
reference
JUH Flyerarlam.de Project flyer Piece 111 0,27 € 30 5
JUH Flyerarlam.de Layman's report Piece 111 0,45 € 50 5
JUH tbd Project homepage Piece 1 200,00 € 200 5
JUH tbd Project video Piece 1 1.000,00 € 1.000 5
JUH tbd Transport trucks Piece 4 375,00 € v;'V^;^H.500 4
JUH tbd Insurance 1 125,00 € 4
JUH tbd Exercise disposables 1 435,00 € ■■■:>ЖЖ.-435 4
JUH tbd Exercise fuel 1 150,00 € ν№4"ι·150 4
JUH tbd Exercise communication 1 150,00 € 150 4
JUH tbd Exercise maintenance and refurbishing 1 2.000,00 € 2.000 4
JUH Tbd - through market research Personal protection equipment Piece 20 230,00 € 4.600 4
(required quality with the best
price)
JUH Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 1 300,00 € 300 4
(required quality with the best
price)
Form F6
Other direct costs
E G н
A IBIMBIl в D F
Coordinator /
Beneficiary Reference to
Supplier/ Procedure Description Units type Units n° Unit costs Total costs €
Task ID / Action
reference
Mol-RO Flyerarlam.de Project flyer Piece 111 0,27 € 30 5
Mol-RO Flyerarlam.de Layman's report Piece 111 0,45 € 50 5
Mol-RO tbd Project homepage Piece 1 200,00 € 200 5
Mol-RO tbd Project video Piece 1 1.000,00 € 1.000 5
Mol-RO tbd Transport trucks Piece 4 375,00 € 1.500 4
Mol-RO tbd Insurance 1 125,00 € 125 4
Mol-RO tbd Exercise disposables 1 435,00 € 435 4
Mol-RO tbd Exercise fuel 1 150,00 € í^^^ÍSO 4
Mol-RO tbd Exercise communication 1 150,00 € 4
Mol-RO tbd Exercise maintenance and refurbishing 1 2.000,00 € 2.000 4
Mol-RO Tbd - through market research Personal protection equipment Piece 20 230,00 € 4.600 4
(required quality with the best
price)
Mol-RO Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 1 300,00 € 300 4
(required quality with the best
price)
Form F6
_____ r-
A в c D E F G H
Coordinator /
Reference to
Beneficiary Supplier/ Procedure Description Units type Units n° Unit costs Total costs €
Task ID / Action
reference
MOH-BE Flyerarlam.de Project flyer Piece 111 0,27 € 5
MOH-BE Flyerarlam.de Layman's report Piece 111 0,45 € 5
MoH-BE tbd Project homepage Piece 1 200,00 € 5
MoH-BE tbd Project video Piece 1 1.000,00 € 1.000 5
MoH-BE tbd Transport trucks Piece 4 375,00 € 1.500 4
MoH-BE tbd Insurance 1 125,00 € 125 4
MoH-BE tbd Exercise disposables 1 435,00 € 435 4
MoH-BE tbd Exercise fuel 1 150,00 € 150 4
MoH-BE tbd Exercise communication 1 150,00 € 150 4
MoH-BE tbd Exercise maintenance and refurbishing 1 2.000,00 € 2.000 4
MoH-BE Tbd - through market research Personal protection equipment Piece 40 230,00 € 9.200 4
(required quality with the best
price)
MoH-BE Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 1 300,00 € 300 4
(required quality with the best
price)
Form F6
c G
CD
A D E F H
Coordinator /
Reference to
Beneficiary Supplier/ Procedure Description Units type Units n° Unit costs Total costs €
Task ID / Action
reference
ULEI Flyerarlam.de Project flyer Piece 111 0,27 € 30 5
ULEI Flyerarlam.de Layman's report Piece 111 0,45 € 50 5
ULEI tbd Project homepage Piece 1 200,00 € 200 5
ULEI tbd Project video Piece 1 1.000,00 € 1.000 5
. TOTAL 94.800
90
Form F7
"In-kind" contributions / costs not included in the budget й11Й11В111|ЯИД
_______________________________________________ Ί
Coordinator /
Beneficiary Description of cost item Total costs €
reference
MoH-BE Qualified personal for training and expertise 12.175
MoH-BE Antwerp University Hospital premises for trainings and stakeholder workshop 6.000
18.175
92
ANNEX IV
MANDATE1
I, the undersigned,
[forename and surname of the legal representative of the future beneficiary signing this
mandate],
representing,
[official legal status orform]2
[official registration No]3 4
[full official address]
[VAT number],
(‘the beneficiary’),
(‘the action’)
hereby:
1. Mandate
[full official name of the coordinator] [ACRONYM]
[official legal status orform]
[official registration Nof
[full official address]
[VAT number],
One original version of this Annex to be included for each beneficiary except for the coordinator.
2 To be deleted or filled in according to the "Legal Entity" form
3 To be deleted or filled in according to the "Legal Entity" form
4
To be deleted or filled in according to the "Legal Entity" form
93
represented by [forename, surname and function of the legal representative of the coordinator]
(‘the coordinator’)
to sign in my name and on my behalf the grant agreement and its possible subsequent
amendments with the European Commission.
2. Mandate the coordinator to act on behalf of the beneficiary in compliance with the grant
agreement.
I hereby confirm that the beneficiary accepts all terms and conditions of the grant agreement
and, in particular, all provisions affecting the coordinator and the other beneficiaries. In
particular, I acknowledge that, by virtue of this mandate, the coordinator alone is entitled to
receive funds from the Commission and distribute the amounts corresponding to the
beneficiary’s participation in the action.
I hereby accept that the beneficiary will do everything in its power to help the coordinator
fulfil its obligations under the grant agreement, and in particular, to provide to the
coordinator, on its request, whatever documents or information may be required.
I hereby declare that the beneficiary agrees that the provisions of the grant agreement,
including this mandate, take precedence over any other agreement between the beneficiary
and the coordinator which may have an effect on the implementation of the grant agreement.
This mandate is annexed to the grant agreement and forms an integral part if it.
SIGNATURE
[forename, sumame, function of the legal representative of the mandating beneficiary]
Done at [place], [date]
In duplicate in English]
94
ANNEX У
A. Progress report(s) on the technical and financial implementation
In accordance with Article 1.4.1 of the Special Conditions of a grant agreement, the
coordinator must regularly inform the Commission in writing on the progress of
implementation of the action.
Article 1.4.1 specifies the number of the progress reports and the period covered by the
reports.
The coordinator shall submit each progress report within 60 days following the end of each
reporting period.
Progress reports should have a maximum length of 4 pages and have as an annex the
updated T forms (technical application forms), allowing the Commission to assess the
project's progress.
Progress reports should contain a summary update of the past, ongoing and planned activities
and outputs of the project. They should also contain relevant comments on project
management and partnership management aspects.
Important
Please attach a one-page financial summary highlighting the project expenditure incurred
during the reporting period; use the form entitled "Consolidated Cost Statement for the
Action", provided as part of Annex VI.
95
B. Structure for the Mid-term and Final Technical Implementation Report
1. Table of contents
2. General reminder (max 1 page) of project objectives, partnership and expected deliverables.
3. General summary of project • General overview of the process
implementation process • Comparative analysis of
- initial and actual time schedule
- planned and used resources
- expected and actual results
4. Evaluation of project • Positive aspects / opportunities
management/implementation process • Internal and external difficulties encountered
• Partnership/core group cooperation (as
appropriate)
• Cooperation with the Commission
• Comments on European value added
• Lessons learnt and possible improvements
5. Activities • Comparison between initially planned and
actually implemented activities, including
monitoring, evaluation and dissemination
• Qualitative evaluation of the activities
6. Presentation of the technical results • Description of individual deliverables
and deliverables • Purpose of the deliverable
(one section per deliverable) • Evaluation of the deliverable
• Value-added - in particular European value-
added and transferability - of the deliverable
• Dissemination
7. Evaluation of the technical results • General lessons learnt
and deliverables • Strengths
• Possible challenges and/or improvements to be
tackled through further action
• Recommendations to stakeholders, partners,
authorities in charge, National and EU
institutions
8. Follow-up • Comparison between initial and current follow
up measures
• Additional follow-up approaches
96
ANNEX VI
GUIDELINES FOR COMPLETING THE FINANCIAL STATEMENT FORMS
PAYMENT OF FURTHER PHE-FINANCING* AND FINAL BALANCE PAYMENT FOR
* Check in Article 1.4.1 of the grant agreement whether it foresees further pre-financing payment!
Before completing the tables please read carefully the explanatory notes:
(1) For the preparation and submission of the final financial statement, the use of the attached
Excel-Workbook is compulsory. In order to have a clear view of the budget consumption at
any time during the implementation of the action, it is recommended that you continuously
fill in the individual sheet, starting at the beginning of the action and updating them regularly.
Please do not attach copies of invoices or time sheets to the final financial statement. You will
be contacted by the Commission if supporting documents are required for the analysis of the
financial statement.
(2) When requesting a payment (further pre-financing, interim or final payment), the following
sheets of the Excel-Workbook must be sent to the Commission in a paper version:
■ the "Standard Payment Request and Financial Statement" (completed, signed and dated by
the coordinator),
- the "Participant Cost Statement Summary" (completed, signed and dated by each of the
participants in the project, i.e. coordinator and beneficiary/ies).
- the "Consolidated Cost Statement for the action" (completed, signed and dated by the
coordinator but only if the project involves beneficiary/ies).
It is preferable (although not obligatory) to attach the other sheets of the Excel-
Workbook in a paper version. In any case, the entire Excel-Workbook must be provided to
the Commission in electronic format (in Excel, not as pdf-file), e.g. on a CD-Rom, memory
stick or sent by e-mail.
(3) For payment requests for further pre-financing, please refer to art. 11.23 and 11.24 of the
General Conditions.
(4) In case the project involves beneficiary/ies, each participant (coordinator and each
beneficiary) must complete an Excel-Workbook to report their own individual costs. For the
beneficiaries there are additional instructions in paragraph (19) at the end of these guidelines.
(5) Remember to keep all working documents used in the preparation of the Excel-Workbook
and the Excel-Workbook itself both in paper and electronic form for future reference.
(6) In all individual sheets, the euro is used as the default currency (and therefore, the default
“exchange rate” is “1”). If the coordinator and/or beneficiary/ies have their accounts
denominated in other currencies, they shall convert the amounts into euros in accordance with
art.n.23.4 of the General Conditions. The monthly exchange rate is published on:
http://ec.europa.eu/budaet/contracts qrants/info contracts/inforeuro/inforeuro en.ctm.
97
(7) You are requested to complete all the relevant sheets, providing the requested details and
respecting the labelling of each column. Please note that the yellow cells generally contain
formulas and should not be completed (unless explicitly specified in these guidelines). In
principle, you should only complete non-coloured cells. For example, in the sheet “Participant
Cost Statement Summary”, you should only fill in the name of the participant and the amount
of "indirect costs/overheads". All other cells (in yellow) will be updated automatically when
you complete the other sheets of the workbook.
(8) The indirect costs/overheads relate to costs which cannot be directly and exclusively allocated
to the project. Typical examples of such costs are office supplies, office rent, telephones, IT,
electricity, heating etc.. This list is not exhaustive! Indirect costs/overheads are eligible to up
to a maximum of 7% of the total amount of eligible direct costs of each participant.
(9) Value added tax (VAT) is eligible, provided that it is included in eligible direct costs, and
unless specified otherwise in the Agreement.
(10) As a general rule, in order for costs to be considered eligible, they must have been actually
incurred and paid, (i.e. proof of payment must be available = transfer of money must be
proven) before the submission of the final financial statement.
(11) Additional rows can be added to the individual sheets by using the insert rows function in
Excel. Please remember to insert these rows after the first and before the last row of the
existing sheet in order not to disturb the formulas contained in the table. Please also re
number the sequential number of the column.
(12) "Personnel costs" sheet: for the calculation of the "annual gross salary", the "annual number
of working time units" and the "time unit rates", you can use the following table:
A Annual salary before tax for the relevant calendar
year, including the 13th (or more) monthly salary.
B + social charges
C + pension contribution
D + holiday allowance
E + Other
F = sum of = annual gross salary
A toE
G Annual time units (*)
H Holidays
I Week-ends
J Bank (public) holidays
K = G- Annual number of working time units
(H+I+J)
L=F/K Time unit rate(s)
(*) For illustration purposes, the annual number of working hours could be calculated in the
following way: from the total number of 52 weeks in a calendar year, deduct 5 weeks of
holiday and 2 weeks of bank holidays, which results in 45 working weeks. 5 working days per
week gives 225 working days, and 7.5 hours per working day, gives 1.687,5 working hours.
This calculation can of course vary since it depends on the specific conditions applicable to
each individual employer. Please note that the deduction of days for sickness may also be
considered, if applicable on the basis of contractual terms. This would normally account for
no more than 2 weeks.
98
(13) If staff are employed on a contractual basis (e.g. short-term work contract), the methodology
described under paragraph 12 does not necessarily apply. The starting point should be the
time unit agreed upon in the contract (and stated in column F), or the final amount paid
according to the contract (and stated in column J, in this case please delete the formula for
this cell). Details of the contract should be explained in column D. An annual equivalent
salary should not be calculated.
(14) Despite the specification in columns M-Y in the sheet “Personnel”, separate individual time
sheets per employee involved in the project must be kept. If your organisation does not
operate with time sheets, you are invited to use the model time sheet provided at the end of
this workbook. Please do not attach copies of the time sheets to the final financial statement.
It should be stressed that time sheets are mandatory for both contractual and permanent
personnel if personnel costs are to be considered eligible for co-funding. For contractual
employees a copy of the contract should be kept. Should you use in the "Personnel" sheet a
different time unit than the one employed by your organisation for time registration (e.g. days
instead of hours), you should provide an explanation on the conversion calculation (e.g. 1 day
equal to 7.5 hours/8 hours etc.).
(15) The “Equipment” sheet must only contain depreciation costs for equipment, purchased and
used during the lifespan of the project, provided that the asset has been purchased in
accordance with Article П.9 of the General Conditions and that it is written off in accordance
with the international accounting standards and the usual accounting practices of the
beneficiary. The costs of rental or lease of equipment or other assets are also eligible,
provided that these costs do not exceed the depreciation costs of similar equipment or assets
and are exclusive of any finance fee. Only the portion of the equipment’s depreciation, rental
or lease costs corresponding to the period set out in Article 1.2.2 of the Special Conditions,
and to the rate of actual use for the purposes of the action, may be taken into account. By way
of exception, the Special Conditions may provide for the eligibility of the full purchase cost
of equipment, where this is justified by the nature of the action and the context of the use of
the equipment or assets.
(16) "In-kind" contributions and costs not included in the budget (ineligible costs) should be
reported in the sheet bearing the same name. Even though these costs are not part of the
calculation of the total eligible costs of action, they are, however, important when establishing
whether or not any of the participants has generated a profit during the action. Please note that
in principle this category could include costs from all other cost categories. Since the layout
of the sheet is rather generic, please provide a detailed description for each item concerned.
(17) The “Funding from other sources” sheet must contain information on revenues from sources
other than the Commission contribution and the coordinator' and/or beneficiaries' own
financing of the action, regardless of whether these revenues have already been received or
are expected to be received. This information is important in assessing the profit situation of
each participant in the action.
(18) The “Calculation of payment” sheet contains the calculation sheet for the final grant amount,
but it is intended for Commission use only. It is included in the Excel-Workbook for
information purposes only. Even though this sheet contains formulae which calculate a
possible final grant amount, this calculation cannot be considered as the final amount payable,
until the Commission has completed its assessment of the financial statement. This may result
in the re-classification or disallowance of some or all costs claimed, should these prove to be
ineligible.
Instructions for the coordinator when one or several beneficiaries participate in the project
99
(19) When one or several beneficiaries participate in the project, the final financial statement must
comprise an individual Excel-Workbook, completed by each of the participants (i.e.
coordinator and beneficiary/ies). On the basis of the individual Excel workbooks, the
coordinator must produce a “consolidated cost statement”, which must be annexed to the
payment request. The relevant table is provided in a separate sheet at the end of the
workbook; it is named “consolidated cost statement”. The coordinator beneficiary is
requested to complete this sheet by adding up the summary sheet of each participant. This
will finally constitute the total costs and revenues of the project.
100
FR01 - Payment Request
STANDARD PAYMENT REQUEST AND FINANCIAL STATEMENT
Grant agreement number
Legal name of the beneficiary
Address
Reference period Eligiblity
From: To:
period
Banking details: Name and address of the bank
Bank account n°
I.B.A.N
Bank account holder
Payment reference (if necessary)
ELI contribution requested
EUR
Pre-financing received
EUR
Balance payment requested EUR
I certify on my honour that the information contained in this payment request is full, reliable and true. I also
certify that the costs incurred can be considered eligible in accordance with the grant agreement and that this
request for payment is substantiated by adequate supporting documents that can be checked.
Name of legal/
statutory representative:
Title:
Function:
Date:
Signature:
Enclosures: (do not apply for the first installment of pre-financing)
- Excel Workbook either on a CD-Rom or sent by e-mail
- External audit report if appropriate
101
102
FR02 - Consolidated Cost Statement
ATTENTION/to be completed only if the project Involves one or more associated beneficiaries
% of eligible
Part A: Eligible cost categories Rate % € Part B: Financing Plan €
costs
A: Personnel EC contribution*
B: Travel and subsistence Contribution of the coordinator
C: Equipment Contribution of the beneficiary/ies
D: Sub-contracting Other sources of funding
E: Other direct costs Direct revenues
Indirect costs / overheads 0.00%
TOTAL ELIGIBLE COSTS 0.00 TOTAL 0.00
* eligible costs x ЕС-funding rate OR maximum ЕС-contribution, whatever is lower!
For information only
Estimation of “in kind“ contributions / costs not
included in the budget (ineligible costs)
Date and signature
104
FR03 ■ Participant Cost Statement
Participant Cost Statement Summary
Name of participant reporting own costs:
% of eligible
Part A: Eligible cost categories Rate % € Part B: Financing Plan €
costs
Personnel 0.00 EC-contribution*
Travel and subsistence 0.00 Contribution of the Coordinator**
Contribution of the Beneficiary
Equipment 0.00
reporting own costs
Sub-contracting / External assistance 0.00 Contribution of other beneficiary/ies 0.00
Other direct costs 0.00 Other sources of funding 0.00
Indirect costs / overheads 0.00% Direct revenues 0.00
TOTAL ELIGIBLE COSTS 0.00 TOTAL 0.00
* eligible costs x ЕС-funding rate OR maximum ЕС-contribution, whatever is lower!
"reporting own costs or contributing to Beneficiary's costs
For information only
Estimation of "in kind" contributions / costs not
included in the budget (ineligible costs) 0.00
VAT-status (please tick appropriate box)
□ The reported costs are without VAT.
□ VAT is not recoverable and is therefore included in
the reported costs. (Proof of non-recoverability
attached)
Date and signature
106
FR04 - Funding from other sources
Contribiitiön of beneficiary/ies
Amount in national Exchange Amount of co-funding
Name of beneficiary
currency rate
1
1
1
1
1
1 Total ' ■ - €0.00
108
FR05 - Personnel costs
Total Personnel: €0.00
General information on staff assigned to the project Calculation of the personnel costs
A B C D E F G H I J K
Function / Type of employment Annual gross Number of time units Total personnel
Seq n° Year Name of person Annual number of Time unit rates Exchange
Time unit assigned to the costs in national
contract salary working time units (ColumnE/G) rate
proiect (column Z) currency (1-1*1)
1 : 0.00 1
2 0.00 1
3 0.00 1
4 0.00 1
5 0.00 1
6 0.00 1
7 0.00 1
8 0.00 1
9 0.00 1
10 0.00 1
11 0.00 1
12 0.00 1
13 0.00 1
14 0.00 1
15 У У'/. '-îïï 0.00 Í
16 0.00 1
17 0.00 1
18 0.00 1
19 0.00 1
20 0.00 1
21 ууу;:1-о.оо 1
22 0.00 1
23 0.00 1
24 0.00 1
25 0.00 1
26 0.00 1
27 0;oo 1
28 0.00 1
29 0,00 1
30 0.00 1
Total
Explanation of the content of each Column
Column Explanation
A Sequential number of the entries. In case additional lines are inserted, please re-number the lines
B The calender year for which the time units in column M-Y is provided
C Name of the person to which the personnel costs refer to
D Function in the project of the person listed in column C/ indicate type of employment contract, e.g. permanent, temporary
E Annual gross salary, please refer to point 13 of the cover note
F Time units used in calculation of the personnel costs, i.e. hours or days (or part thereof) - Please use the same unit as in columns N to Z
G The total annual number of working time units, please refer to point 13 of the guidelines
H Is obtained by dividing column E by G, except in cases where it is temporary contracted staff where a fixed rate (hourly, daily, weekly, monthly) is negotiated, then the calculation takes starting point in that rate
1 Number of time units assigned to the project (column Z)
J Total personnel costs assigned to the project in national currency
K Exchange rate used to convert the national currency into €
L Total personnel costs assigned to the project in € (column J/ column K)
FR05 - Personnel costs
L
Amount in €
(J/K)
. . ... :
■ ■ ... :■
■ . ■■
^..
:
€0.00
FR05 - Personnel costs
Time units worked on the project
(A) M N 0 P Q R S T U V X Y Z
Seqn° January February March April May June July August September October Total per
November December
calendar year
1 0.00
2 0.00
3 0.00
4 0.00
5 0.00
6 0.00
7 0.00
8 0.00
9 0.00
10 0.00
11 0.00
12 0.00
13 0.00
14 0.00
15 0.00
16 0.00
17 0.00
18 0.00
19 0.00
20 0.00
21 0.00
22 0.00
23 0.00
24 0.00
25 0.00
26 0.00
27 0.00
28 0.00
29 0.00
30 0.00
Explanation of the content of each Column
Column Explanation
M-Y Specification of the number of time units assigned to the project per month based on the detailed individual timesheet kept per person.
Z Sum of columns M to Y
112
FR06 - Travel and Subsistence
Total of Travel and subsistence costs: €0.00
A B C D E F G H I j K
Reference number Date of
Date of Name(s) of person(s) Amount in national Exchange
Seq n° of accounting accounting Purpose of the travel and duration Location (from/to) Description of the cost item Amount in € (l/J)
payment traveling currency rate
document document
1 1
2 1
3 1
4 1
5 1
6 1
7 1 V"·.·: : ■ >;
8 1
9 1
10 1
11 I :
12 1
13 I :
14 1
15 1
16 1
17 1
18 1
19 1
20 1
21 1
22 1
23 1
24 1
25 1 ' ' . ■ ■ ■■■■ ·:·· · ■ ■ ■
26 1
27 1
28 1
29 I
30
Total
Explanation of the content of each Column
Column Explanation
A Sequential number of the entries. In case additional rows are inserted, please re-number the rows
B Reference number of the accounting document, which could be travel ticket, hotel invoice, per diem calculation form etc.
c Date of the accounting document
D Date of payment of the cost item
E Name(s) of personfs) traveling
F Purpose of the travel, for example participating in various meetinqs, work shops, field exercise etc, and duration
G Location: for travel expenses the distance traveled from and to. For hotel costs the location of the hotel. For per diem the country on basis of which tíre per diem is calculated
H Description of the cost item, I.e. travel costs, hotel costs or per diem. Please provide one line per cost item
1 Amount in national currency
J Exchange rate used to convert the national currency into €
K Amount in € (column I/column J)
114
FR07 - Equipment
Total Equipment: €0.00
A B c D E F G H I J к
Date of Number of Depreciated amount Exchange Depreciated amount
Seq n° Payment date Supplier Description of equipment Invoice amount Description of depreciation method used
invoice invoice in national currency rate in € (H/l)
1 1
2 1
3 1
4 1
5 1
6 1 -ЖР. .':ЛЖ-...Ж ; ;;; " . v-
7 1
8 1
9 t w :■ -;W"V.,V : ■
10 1 ЖЖ V .
11 1 v·—,. жж.: ж.ж.
12 1
13 1 ■
14 1 ..4:·
15 1 ■"V-': ■■ ■: ж”:’') ■
16 1
17 1
18 1
19 1 í·..,.-·,-..·,..· - ■
20 1 . -, , .■
21 1 ... ж-ж
22 1 ; - Ж;::: „■;.·■ 7.^·":· '
23 1 Ж‘ЖЖ;Ж;Ж,-Г.:
24 1 ■ 7:;:7κ.·ΐ·-'κν.
25 1
26 1
27 I
28 1 .
29 1
30 1 :жжжлжжг..ж,'л:.
Total cacio
Explanation of the content of each Column
Column Explanation 1 | | |
A Sequential number of the entries. In case additional rows are inserted, please re-number the rows
B Number of invoice of purchase of equipment
C Date of invoice of the purchase of the equipment
D Date of payment
E Supplier
F Description of the equipment purchased
G Invoice amount
H Depreciated amount in national currency
1 Exchange rate used to convert the national currency into €
J Amount In € (column tH/column 1)
K Description of depreciation method used
116
FR08 - Sub-contracting/ External Assistance
Total Sub-contracting: €0.00
A B c D E F G H
Date of Date of Invoiced amount in
Seq n° Number of invoice Name of sub-contractor Description of sub-contracted item/ service Exchange rate
invoice payment national currency
1 I
2 1
3 1
4 1
5 1
6 Ì
7 1
8 1
9 1
10 1
11 1
12 1
13 1
14 1
15 1
16 1
17 1
18 1
19 1
20 1
21 1
22 1
23 1
24 1
25 1
26 1
27 1
28 1
29 1
30 1
Total
Explanation of the content of each Column
Column Explanation
A Sequential number of the entries. In case additional rows are inserted, please re-number the rows
в Date of invoice
c Number of invoice
D Date of payment
E Name of sub-contractor
F Description of the sub-contracted item/ service
G Invoiced amount in national currency
H Exchange rate used to convert the national currency into €
1 Invoiced amount in € (column G/column H)
FR08 - Sub-contracting/ External Assistance
I
Invoiced amount in €
Ï'ï'
ь .■■ i;,:.»,'···—. -.„»Ijl?
vľrr
__
: V
—
w—."-i.
----------- i------
■---------------------------------------------------------
FR09 - Other direct costs
Total Other direct costs: «ο.οο
A B c D E F G H
Date of Number of Date of invoiced amount in
Seq n° Supplier Description of cost item Exchange rate
invoice invoice payment national currency
1 1
2 1
3 1
4 1
5 1
6 1
7 1
8 1
9 1
10 1
11 1
12 1
13 1
14 1
15 1
16 1
17 1
18 1
19 1
20 t
21 1
22 1
23 1
24 1
25 1
26 1
27 1
28 1
29 1
30 1
Total
Explanation of the content of each Column
Column Explanation
A Sequential number of the entries. In case additional rows are inserted, please re-number the rows
B Date of invoice
C Number of invoice
D Date of payment
E Supplier
F Description of the cost item
G Invoiced amount in national currency.
H Exchange rate used to convert the national currency into €
1 Invoiced amount in € (column G/column H)
FR09 - Other direct costs
I
Invoiced amount in €
_JG/HL__
-------------- —
■
FR10 - In-kind contributions/ Cost not included in the budget
Total of "In-kind" contributions/ costs not included in the budget: €0.00
A B C
Seq n° Description of cost item Estimated amount in €
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Total €0.00
Explanation of the content of each Column
Column
A Sequential number of the entries. In case additional rows are inserted, please re-number the rows
B Description of the cost item
D Amount in €
122
Model monthly time-sheet
oject Reference
ime of Beneficiary/ Partner
ime of staff member
staff member employed Full-time or Part-time
ilendar Year
ilendar Month
ilendar Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
case of absence, indicate one of the reason
des below
lurs worked on this project
iurs worked on other projects*
iurs worked on other projects*
iurs worked on other projects*
iurs worked on other projects*
iurs worked on other projects*
her activities
ital hours (including overtime) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
idicate project reference
Absences Summary for this month
eekend WE Hours worked on this project 0.0
ck leave SL Hours worked on other projects* 0.0
iblic holidays PH Hours worked on other projects* 0.0
inual holidays AH Hours worked on other projects* 0.0
her absence OA Hours worked on other projects* 0.0
Hours worked on other projects* 0.0
Other activities 0.0
Total hours (including overtime) 0.0
ate and signature of staff member Date and signature of Project Manager/ Coordinator/Responsible
124
Katrin Viikmaa
Rahandusministeerium
[email protected] Meie 13.03.2017 nr 1.8-1/1172-1
Endla 13
10122, TALLINN
Terviseameti sildfinantseerimise
väljamaksetaotlus projekti „European Modular
Field Hospital“ raames
Lugupeetud Katrin Viikmaa
Palun võimaldada Terviseametil kasutada sildfinantseerimise vahendid kooskõlas
Riigieelarve seadus §54 ja Vabariigi Valitsuse 02. jaanuari 2014. a korraldusega nr 19
„Välisabi sildfinantseerimine“ rahastamaks Euroopa Komisjoni projekti „European Modular
Field Hospital“.
Palun võimaldada sildfinantseerimise vahendite kasutamist alates 13. märts 2017. a
summas 38 500 eurot . Sildfinantseerimise vahendite kasutamise periood on 13.03.2017 -
31.12.2017. Grant kood: 9T70-HOSPITAL
Eeldatav toetuse laekumise aeg on 30.06.2019.Taotletud välisabi sildfinantseerimise
ulatuses ei ole välisabi laekumine kahtluse all. Vahendite osalise või täismahus
mittelaekumise korral vastutab Terviseameti projekti sildfinantseerimise jäägi tagastamise
eest. Sotsiaalministeerium on nõus sildfinantseerimise jäägi tähtaegselt tagastamata
vahendite kinnipidamisega oma eelarvelistest vahenditest.
Lugupidamisega
(allkirjastatud digitaalselt)
Marika Priske
Kantsler