dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Sotsiaalministeerium
Väljaminev kiriAvalik

Taotlus

Sotsiaalministeerium · 13. märts 2017
Viit
1.8-1/1172-1
Registreeritud
13. märts 2017
Dokumendi liik
Väljaminev kiri
Adressaat
Rahandusministeerium
Saabumis/saatmisviis
DVK
Funktsioon
1.8 Finantsplaneerimine ja raamatupidamisarvestus
Sari
1.8-1 Finantsplaneerimise, eelarve ja majandusarvestusega seotud kirjavahetus
Toimik
1.8-1/2017
Vastutaja
Pille Erm (SM, Strateegia ja eelarve osakond)

Failid

  • 📎1.8-11172-1 13.03.2017 Väljaminev kiri.bdoc4504 KB

Sisu (failidest)

TERVISEAMET HEALTH BOARD Lp Pille Erm Sotsiaalministeerium Strateegia ja eelarve osakond 06.03.2017 nr 1.1-11.11/1510 [email protected] Sildfinantseerimise taotlus Lugupeetud Pille Erm Palume võimaldada Terviseametil kasutada sildfinantseerimise vahendeid kooskõlas „Riigieelarve seaduse“ § 54 rahastamaks Euroopa Komisjoni Välihaigla projekti „European Modular Field Hospital“. Sildfinantseerimise vahendid summas 38 500 eurot palume võimaldada kasutada alates 13. märtsist 2017. a. Eeldatav toetuse laekumise aeg on 30.06.2019. Taotletud summa ulatuses ei ole välistoetuse vahendite laekumine kahtluse all. Vahendite osalise või täismahus mittelaekumise korral vastutab Terviseamet sildfinantseerimise jäägi tagastamise eest. Lugupidamisega (allkirjastatud digitaalselt) Tiiu Aro peadirektor Lisad: 1. Sildfin_taotlus_2017.xlsx 2. Grant Agreement_EUMFH.pdf Olga Galaburda +372 694 3513 [email protected] Tartu mnt 85 Tel +372 694 3500 Tervishoiutöötajate ja tegevuslubade registrite 10115 Tallinn osakond: Gonsiori 29, Tallinn tel 650 9847 Kemikaaliohutuse osakond: Gonsiori 29, Tallinn tel 626 9388 Esmatasandi tervishoiu osakond: Gonsiori 29, Tallinn tel 650 9861 Erakorralise meditsiini osakond: Gonsiori 29, Tallinn tel 626 9860 Järelevalve osakond: Hiiu 42, Tallinn tel 694 3724 Meditsiiniseadmete osakond: Põllu 1a, Tartu tel +372 5809 4339 www.terviseamet.ee e-post: [email protected] Kesklabor: Kotka 2, Tallinn tel 694 3673 Registrikood 70008799 Tartu labor: Põllu 1a, Tartu tel +372 5809 3071 Kohtla-Järve labor: Kalevi 10, Kohtla-Järve tel +372 5880 3572 Réi- D............................... Ref. Ares(2016)6887556 - 09/12/2016 t r . . European Commission D9. 12.2016 , Directorate-General for European Civil Protection and Humanitarian Aid Operations (ECHO) -­ ECHO A - Emergency Management Unit A4- Civil Protection Policy Brussels, ECHO.A.4 (2016) Sent by DHL Mr Luigi D'Angelo Presidency of the Council of Ministers, Italian Civil Protection Department ViaUlpiano 11, IT-00193 Rome, E-mail: [email protected] Ref.: 2016 Call for prevention and preparedness projects in the field of civil protection and marine pollution Subject: Your proposal 2016/PREP/14 - European Union Medical Field Hospital (EUMFH) Dear Mr D'Angelo, I have the pleasure of sending you two originals of the Grant Agreement already signed. Would you please have the two agreements signed and dated with the mention “read and approved” by the authorized person. Moreover, please note that the annexes form an integral part of the Grant Agreement. Therefore, the signed version of the Grant Agreement must be returned to the Commission together with Annex(es) IV "Mandates provided to the coordinator by the other beneficiaries" - duly completed and signed by each beneficiary. One signed original Grant Agreement with the signed original annex(es) IV should be returned to the following address within two weeks after you receive this letter: European Commission Directorate-General for European Civil Protection and Humanitarian Aid Operations (ECHO) Document Management Sector D.5.002 L-86 03/022 BE-1049 Brussels You may not, under any circumstances or procedures, introduce changes in the agreement transmitted for signature. The Grant Agreement shall be considered concluded and shall enter into Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. +32 22991111 Office: L-86 4/023 - Tel. direct line +32 229-65741 force on the date of receipt by ECHO of one original, duly signed by both parties with the original version of the Annex(es) IV signed by each beneficiary. Yours sincerely, Mr Alfonso de la Eufnte üarrigosa Acting Head óf Unit Enclosure: Two copies of the grant agreement cc. Elisabetta BELLOCCHI (ECHO.A4) 2 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 European Commission Sįįr; Directorate-General for European Civil Protection and Humanitarian Aid Operations (ECHO) *.** +ч. « * ECHO A - Emergency Management ** , « * Unit A4- Civil Protection Policy GRANT AGREEMENT FOR AN ACTION WITH MULTIPLE BENEFICIARIES AGREEMENT NUMBER - ECHO/SUB/2016/739964/PREP14 This Agreement (‘the Agreement’) is concluded between the following parties: on the one part, The European Union (‘the Union’), represented by the European Commission (‘the Commission’), represented for the purposes of signature of the Agreement by Mr Alfonso De La Fuente Garrigosa, Acting Head of Unit, and on the other part, 1. Presidenza del Consiglio dei Ministri - Dipartimento di Protezione Civile Public Law Body 11, Via Ulpiano IT-00193 Rome VAT n° 97018720587 represented for the purposes of signature of the Agreement by Mr Fabrizio CURCIO, Head of Department and the following other beneficiaries: 2. Federal Public Service of Health, established in Belgium 3. Beredskabsstyrelsen (Danish Emergency Management Agency), established in Denmark 4. Health Board, established in Estonia 5. Direction generale de la securité civile et de la gestion des crises, established in France 6. Johanniter-Unfall-Hilfe e.V., established in Germany 7. Universität Leipzig, established in Germany 1 Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016 8. Ministry of Internal Affairs - Department for Emergency Situations, established in Romania 9. Asociácia samaritánov Slovenskej republiky, established in Slovakia duly represented by the coordinator by virtue of the mandates included in Annex IV for the signature of the Agreement, Unless otherwise specified, references to ‘beneficiary’ and ‘beneficiaries’ include the coordinator. The parties referred to above HAVE AGREED to the Special Conditions (‘the Special Conditions’) and the following Annexes: Annex I Description of the action Annex II General Conditions (‘the General Conditions’) Annex III Estimated budget of the action Annex IV Mandates provided to the coordinator by the other beneficiaries Annex V Guidelines for technical reports Annex VI Model financial statement Annex VII Model terms of reference for the certificate on the financial statements: not applicable Annex VIII Model terms of reference for the certificate on the compliance of the cost accounting practices: not applicable which form an integral part of the Agreement. The provisions in the Special Conditions of the Agreement take precedence over its Annexes. The provisions in Annex II ‘General Conditions’ take precedence over the other Annexes. 2 Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016 SPECIAL CONDITIONS ARTICLE 1.1 - SUBJECT MATTER OF THE AGREEMENT The Commission has decided to award a grant, under the terms and conditions set out in the Special Conditions, the General Conditions and the other Annexes to the Agreement, for the action entitled European Union Medical Field Hospital (EU-NOM) as described in Annex I. With the signature of the Agreement, the beneficiaries accept the grant and agree to implement the action, acting on their own responsibility. ARTICLE 1.2 - ENTRY INTO FORCE OF THE AGREEMENT AND IMPLEMENTATION PERIOD 1.2.1 The Agreement enters into force on the date on which the last party signs. 1.2.2 The action runs for 24 months starting on 01/01/2017. ARTICLE 1.3 - MAXIMUM AMOUNT AND FORM OF THE GRANT 1.3.1 The maximum amount of the grant is EUR 784 406. 1.3.2 The grant takes the form of: (a) the reimbursement of 75% of the eligible costs of the action (‘reimbursement of eligible costs’), which are estimated at EUR 1045 875 and which are: (i) actually incurred (‘reimbursement of actual costs’) for the beneficiaries (ii) reimbursement of unit costs: not applicable (iii) reimbursement of lump sum costs: not applicable (iv) declared on the basis of a flat rate of 2% of the eligible direct costs (‘reimbursement of flat-rate costs’) for the indirect cost for the beneficiaries (v) reimbursement of costs declared on the basis of the beneficiary’s usual cost accounting practices: not applicable (b) unit contribution: not applicable (c) lump sum contribution: not applicable (d) flat-rate contribution: not applicable ARTICLE 1.4 - REPORTING - REQUESTS FOR PAYMENT 1.4.1 Reporting periods The action is divided into úit following reporting periods: 3 Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016 - Reporting period 1 : from month 1 to month 8 - Reporting period 2: from month 9 to month 16 - Final reporting period: from month 1 to the end of the implementation period Within 60 days following: (a) the end of reporting periods 1 and 2 the coordinator must submit a report on the implementation of the action covering the period concerned in accordance with Annex V; (b) the end of the final reporting period the coordinator must submit a request for payment of the balance in accordance with Article 1.4.4. 1.4.2 Request for further pre-financing payment and supporting documents: Not applicable 1.4.3 Request[s] for interim payments] and supporting documents Not applicable 1.4.4 Request for payment of the balance and supporting documents The coordinator must submit a request for payment of the balance within the deadline indicated in Article 1.4.1 accompanied by the following documents: (a) a final report on implementation of the action (‘final technical report’), drawn up in accordance with Annex V, containing: (i) the information needed to justify the eligible costs declared or the contribution requested on the basis of unit costs and lump sums (where the grant takes the form of the reimbursement of unit or lump sum costs or of a unit or lump sum contribution in accordance with Article I.3.2(a)(ii) and (iii), (b) or (c)), and (ii) information on subcontracting as referred to in Article II. 11.1(d); (b) a final financial statement (‘final financial statement’): not applicable ; (c) a summary financial statement (‘summary financial statement’). This statement must include a consolidated financial statement and a breakdown of the amounts declared or requested by each beneficiary and its affiliated entities and must indicate the receipts referred to in Article 11.25.3 for each beneficiary and its affiliated entities. It must be drawn up in accordance with Annex VI; (d) a certificate on the financial statements and underlying accounts (‘certificate on the financial statements’) for each beneficiary and for each affiliated entity, if: (i) the cumulative amount of payments the beneficiary requests as reimbursement of actual costs as referred to in Article I.3.2(a)(i) (and for which no certificate has yet been submitted) is EUR 325 000 or more; (ii) the maximum grant amount indicated, for that beneficiary and its affiliated entities, in the estimated budget as reimbursement of actual costs is EUR 750 000 or more. Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 This certificate must be produced by an approved auditor or, in case of public bodies, by a competent and independent public officer and drawn up in accordance with Annex VII. It must certify that the costs declared in the final financial statement by the beneficiary concerned or its affiliated entities for the categories of costs reimbursed in accordance with Article I.3.2(a)(i) are real, accurately recorded and eligible in accordance with the Agreement. In addition, it must certify that all the receipts referred to in Article 11.25.3 have been declared. The coordinator must certify that the information provided in the request for payment of the balance is full, reliable and true. It must also certify that the costs incurred can be considered eligible in accordance with the Agreement and that the request for payment is substantiated by adequate supporting documents that can be produced in the context of the checks or audits described in Article 11.27. In addition, it must certify that all the receipts referred to in Article II.25.3 have been declared. 1.4.5 Information on cumulative expenditure incurred Not applicable 1.4.6 Currency for requests for payment and financial statements and conversion into euro Requests for payment and financial statements must be drafted in euro. Beneficiaries and affiliated entities with general accounts in a currency other than the euro must convert costs incurred in another currency into euro at the average of the daily exchange rates published in the C series of Official Journal of the European Union, determined over the corresponding reporting period (available at http://www.ecb.europa.eu/stats/exchange/eurofxref/html/index.en.html ). If no daily euro exchange rate is published in the Official Journal of the European Union for the currency in question, conversion must be made at the average of the monthly accounting rates established by the Commission and published on its website (http://ec.europa.eu/budget/contracts grants/info contracts/inforeuro/inforeuro en.cfrn), determined over the corresponding reporting period. Beneficiaries and affiliated entities with general accounts in euro must convert costs incurred in another currency into euro according to their usual accounting practices. 1.4.7 Language of requests for payments, technical reports and financial statements 5 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 All requests for payments, technical reports and financial statements must be submitted in English. ARTICLE 1.5 - PAYMENTS AND PAYMENT ARRANGEMENTS 1.5.1 Payments to be made The Commission must make the following payments to the coordinator: - one pre-financing payment; - one payment of the balance, on the basis of the request for payment of the balance referred to in Article 1.4.4. 1.5.2 Pre-financing payment The aim of the pre-financing is to provide the beneficiaries with a float. It remains the property of the Union until it is cleared against interim payments or, if it is not cleared against interim payments, until the payment of the balance. The Commission must make the pre-financing payment of EUR 549 084,20 to the coordinator within 30 calendar days from the entry into force of the Agreement, except if Article 11.24.1 applies. 1.5.3 Interim payment[s] Not applicable 1.5.4 Payment of the balance The payment of the balance reimburses or covers the remaining part of the eligible costs incurred by the beneficiaries for the implementation of the action. If the total amount of earlier payments is greater than the final amount of the grant determined in accordance with Article 11.25, the payment of the balance takes the form of a recovery as provided for by Article 11.26. If the total amount of earlier payments is lower than the final amount of the grant determined in accordance with Article 11.25, the Commission must pay the balance within 60 calendar days from receiving the documents referred to in Article 1.4.4, except if Article 11.24.1 or II.24.2 apply. Payment is subject to the approval of the request for payment of the balance and of the accompanying documents. Their approval does not imply recognition of the compliance, authenticity, completeness or correctness of their content. The amount due as the balance is determined by deducting the total amount of pre-financing and interim payments (if any) already made from the final amount of the grant determined in accordance with Article 11.25. 6 Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016 The amount to be paid may however be offset, without the beneficiary’s consent, against any other amount owed by the beneficiary to the Commission or to an executive agency (under the EU or Euratom budget), up to the maximum contribution indicated, for that beneficiary, in the estimated budget in Annex III. 1.5.5 Notification of amounts due The Commission must send a formal notification to the coordinator: (a) informing it about the amount due and (b) specifying whether it concerns a further pre-financing payment, an interim payment or the payment of the balance. For the payment of the balance, it must also specify the final amount of the grant determined in accordance with Article 11.25. 1.5.6 Interest on late payment If the Commission does not pay within the time limits for payment, the beneficiaries are entitled to late-payment interest at the rate applied by the European Central Bank for its main refinancing operations in euros (‘the reference rate’), plus three and a half points. The reference rate is the rate in force on the first day of the month in which the time limit for payment expires, as published in the C series of the Ojficial Journal of the European Union. Late-payment interest is not due if all beneficiaries are Member States of the Union (including regional and local government authorities and other public bodies acting in the name and on behalf of the Member State for the purpose of the Agreement). The suspension of the time limit for payment in accordance with Article II.24.2 or of payment by the Commission in accordance with Article 11.24.1 may not be considered as late payment, Late-payment interest covers the period running from the day following the due date for payment, up to and including the date of actual payment as established in Article 1.5.8. The interest payable is not considered for the purposes of determining the final amount of grant within the meaning of Article 11.25. As an exception to the first subparagraph, when the calculated interest is lower than or equal to EUR 200, it must be paid to the coordinator only upon request submitted within two months of receiving late payment. 1.5.7 Currency for payments The Commission must make payments in euro. 1.5.8 Date of payment Payments by the Commission are considered to have been carried out on the date when they are debited to its account. 1.5.9 Costs of payment transfers 7 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 Costs of the payment transfers are bome in the following way: (a) the Commission bears the costs of transfer charged by its bank; (b) the beneficiary bears the costs of transfer charged by its bank; (c) the party causing a repetition of a transfer bears all costs of repeated transfers. 1.5.10 Payments to the coordinator The Commission must make payments to the coordinator. Payments to the coordinator discharge the Commission from its payment obligation. ARTICLE 1.6 - BANK ACCOUNT FOR PAYMENTS All payments must be made to the coordinator’s bank account as indicated below: Name of bank: Banca d'Italia Tesoreria central dello Stato Address of branch: Via XX Settembre 97E, IT-00187 Rome, Italy IBAN code: IT49 J0100003245350200022330 ARTICLE 1.7 - DATA CONTROLLER, COMMUNICATION DETAILS OF THE PARTIES 1.7.1 Data controller The entity acting as a data controller according to Article II.7 is the Head of Unit in charge of legal affairs of the Commission's Directorate-General for European Civil Protection and Humanitarian Aid Operations. 1.7.2 Communication details of the Commission Any communication addressed to the Commission must be sent to the following address: European Commission Directorate-General for European Civil Protection and Humanitarian Aid Operations - ECHO Unit A/4 - Civil Protection Policy L-86,04/27 BE-1049 Brussels Email: ECHO-CP-P£[email protected] 1.7.3 Communication details of the beneficiaries Any communication from the Commission to the beneficiaries must be sent to the following address: Civil Protection Department Presidency of the Council of Ministers 11, Via Ulpiano IT-00193 Rome 8 Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016 E-mail: [email protected] 1.8 SPECIFIC CONDITIONS 1.8.1 Spatial data Not applicable 1.8.2 Ineligibility of cost of staff of national administrations By way of derogation from Article II. 19.2 (a), the costs related to staff of national administrations are eligible only to the extent that they relate to the cost of activities which the relevant public authority would not carry out if the Action concerned were not undertaken. 1.8.3 Co-financiers Not applicable 1.8.4 Communication concerning the suspension of the time limit for payment By derogation from Article II.24.2.2, communication concerning the suspension of the time limit for payment shall be done by e-mail. 1.8.5 Entities affiliated to the beneficiaries Not applicable 1.8.6 Additional provisions on use of the results (including intellectual and industrial property rights) Not applicable 1.8.7 Obligation to conclude an internal co-operation agreement Not applicable 1.8.8 Special provisions on the financial responsibility for recoveries Not applicable 1.8.9 Ineligibility of value added tax As an exception to Article II. 19.2 (h), paid value added tax (VAT) is not eligible for tasks 1,2,3 and 4 as described in the application form for the following beneficiaries: 1. Presidenza del Consiglio dei Ministri - Dipartimento di Protezione Civile, established in Italy 2. Federai Public Service of Health, established in Belgium 3. Beredskabsstyrelsen (Danish Emergency Management Agency), established in Denmark Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016 4. Health Board, established in Estonia 5. Direction generale de la securité civile et de la gestion des crises, established in France 6. Ministry of Internal Affairs - Department for Emergency Situations, established in Romania 1.8.10 Special provisions on budget transfers As an exception to the first subparagraph of Article 11.22, budget transfers between budget categories are limited to EUR 30 000 of the amount of each budget category for which the transfer is intended. 1.8.11 Settlement of disputes with non EU beneficiaries Not applicable 1.8.12 Beneficiaries which are international organisations Not applicable Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 SIGNATURES For the coordinator For the Commission Mr Fabrizio CURCIO, Mr Alfonso De La Fugħte tiamgosa ’ Head of Department Acting Head of Unit ĮTV [signature] [signature] Done at [place], [date] Done at Brussels, [date] 0 9 DEC, 2011 11 12 Form Т1 - Description of the action - Annex I SUMMARY OF THE PROJECT (max 20 lines per box) Title of the project EUMFH: European Union Modular Field Hospital Prevention or preparedness Preparedness Actions aimed at enhancing operational cooperation in the Priority covered framework of the Mechanism, including across sectors, enabling countries to develop, exercise and register multinational assets. Internal or External Internal - , 1. Summary of the project Describe the context and the issue/challenge/gap that the proposal aims to address. The European medical response system is currently comprised of first responder units that are operating in a quick and light manner. While those capacities constitute an essential Union Civil Protection (UCP) element, emergencies like the earthquake in Haiti, or more recently the typhoon in the Philippines and the Ebola crisis, have clearly demonstrated the necessity for more enhanced and comprehensive health capacities for a longer duration, ranging from 3 weeks up to 3 + months, bridging towards a more structural long term relief. Experience demonstrates that when medical teams are deployed, local capacity is often hit in such a hard way that a referral to local healthcare facilities becomes impossible. Moreover, the strong involvement of the UCP Mechanism in humanitarian crises (i.e. Tunisia, Jordan, and Turkey) highlights and reinforces the need to expand these capabilities. In 2010, after the Haiti Earthquake and the Pakistan floods, the Global Health Cluster identified a need to ensure quality and standardise services provided by International Medical teams. The Emergency Medical Teams (EMT) - working group of the Global Health Cluster developed a document outlining the minimum standards for EMT’s and the variety of services they provide as well as a referral system. This work is still ongoing under the guidance of the World Health Organisation (WHO). The goal is to ensure a coordinated package of services accountable to the care-seeker and the local government to which the services are offered. A registration system was developed where medical teams can register themselves and declare that they will work according to the minimum standards. Current developments show that there is a clear lack of active deployable level 3 Emergency Medical Teams i.e. referral hospitals in the field. Therefore, there is a real need for a high level medical module that can be deployed for a longer term mission without putting the burden on one single Member State or organisation. 13 14 2.0bjectives Describe the general and specific objectives of the project in relation to the priority chosen. The deployment of a more comprehensive health capacity requires the involvement of extensive human resources and logistic elements for medium or long-term periods. In most cases, Civil Protection organisations are neither prepared nor equipped for this kind of deployment. Furthermore, this kind of operation generates high costs and requires a strong and long lasting commitment. To be effective, a different approach is required, which can be based on a joint operation where several Participating States combine their efforts in a coordinated manner. The project European Modular Field Hospital (EUMFH) aims to explore how to improve the medical capacity of the UCPM while meeting high standards of quality, rapid deployment, and accountability and sustainability for the deployment of a common European medical capacity to deliver healthcare in accordance with, or above, the minimum standards drafted by the WHO EMT working group. The following specific objectives for the project were identified: • What are the components or sub-units and their requirements for a EU EMT type 3? • What is the profile of personnel? And what are the trainings and exercises required for a EU EMT 3? • What training is needed? How is interoperability feasible? • What are the Terms of Reference (TOR’S) and Standing Operating Procedures (SOP’s)? • What standards of care should be achieved? How can they be implemented? • What are the standard and how can a common architectural structure for a EUEMT 3 be delivered? 3. Expected results Describe the expected results of the project. What will be the short, medium and long term impacts and the added value of these results? Please describe how the project will improve or complement the existing market situation, latest developments or current practices in the relevant area? Demonstrate the complementarity to the efforts already made in the relevant area The expected results include among others, to design and test a multinational asset. This project will assess the possibility to build: • An immediately deployable and self-sufficient European healthcare infrastructure meeting the requirements of a level 3 facility in the Guidelines for Foreign Medical Teams in sudden onset disasters. • With highly qualified and trained staff • Adhering to all relevant standards of care • With a tested and proven concept for a multinational cooperation • With TOR’S and SOP’s for implementing partners 15 The EUMFH-concept should guarantee interoperability, internally as well as with relevant partners in the field as e.g. Ministry of Health, World Health Organisation, UCP team, OSOCC, the EMTCC, other medical teams... The outcome of this project will not be the direct registration of an EMT level 3 in CECIS at this moment. However, it will create the necessary conditions and the opportunity for those Member States that consider doing so. Several Member States have already indicated that this project will be used by them to determine their commitment, and consider it as an added value to define their contribution. The concept might prove an opportunity for future projects to consider implementing the hospital in future projects e.g. as an asset in the Voluntary Pool in CECIS and/or in the WHO Global Registry of International Emergency Medical Teams. 4. Final beneficiaries Indicate who would be the potential beneficiaries and end-users of your project results. Please demonstrate their interest and support (e.g. enclose letters of support). Potential beneficiaries of the EUMFH-project are: • The population in need of healthcare after a disaster that impacted the local healthcare infrastructure. • The impacted national system and other International Medical Teams on the ground: Special focus will be on high level, referral care, that can’t be delivered by the available national system, or by other international medical teams on the ground. • Member States that do not have registered medical teams: The project can be an opportunity for those Member States that do not have registered medical teams, but do have an added value available (staff, infrastructure, ...) to be part of an integrated multinational response with high impact. • Other modules of the UCPM: The EUMFH can be used as a referral centre for staff of the other UCPM - modules in the field • Medical Non-Governmental Organisations (NGOs): the EUMFH can bridge from civil protection towards humanitarian assistance during a major crisis and this structure could be handed over during the recovery phase. 16 5. Methodology/Organizational structure Describe the methodology to be used to achieve the expected result, present briefly the partnership and the project team who will be responsible for the project tasks. Describe the preparatory work already done and the considerations for the composition of the partnership. Consensus was reached to use the main tasks that are also used in the “Guidelines for Foreign Medical Teams in Sudden Onset Disasters” to identify the necessary actions in the project. For project purposes we added project management. • Governance • Logistics • Healthcare • Staff, Training and Exercises • Project Management For each task there will be a working group under the guidance of one of the consortium partners. Each of these working groups has a number of assigned actions, under responsibility of one of the partners. 17 6. Implementing partnership and projectteam Give details on how the implementing partnership will cooperate during the implementation of the project; explain the roles and responsibilities of the different partner organisations and any subcontracting arrangements (if applicable). If the successful project implementation necessitates contribution /involvement of any other organisation (e.g. providing access to a venue or information by a public authority, etc.) please explain the necessary arrangements. • Overall project lead (coordinating beneficiary): Italian Civil Protection Department • Project management group: Belgian Ministry of Health, Italian Civil Protection Department and Johanniter-Unfall-Hilfe Germany. Johanniter-Unfall-Hilfe Germany will be responsible for the administrative issues and financial management of the project. • Steering committee: Belgian Ministry of Health, Danish Emergency Management Agency, Estonian Health Board, Italian Civil Protection Department, Johanniter-Unfall-Hilfe Germany, French Directorate General for Civil Protection and Crisis Management, Romanian Department of Emergency Situations, the Asociácia Samaritánov Slovenskej Republiky from the Slovak Republic and the University of Leipzig. • Advisory body: World Health Organisation (WHO) as a permanent member, Handicap International, National Centre of Emergency Care Greece (EKAB) and others can be invited on an ad-hoc basis. There was an exchange of letters with the European Centre of Disease Control. Though there is no commitment from their side at this moment, they are very interested and seriously consider cooperating when the project is approved. DG ECHO A5 / B1 will be invited to provide feedback on how they can be involved in the most optimal way to enhance future cooperation. 18 Four Main tasks were identified (See Paragraph 5, Methodology/Organisational Structure) to be completed each under the guidance of one of the members of the consortium (steering committee). Each of these main tasks will cover different actions, again under the guidance of one of the consortium members. The role of the project management team is to supervise the progress and outcome of each task and each activity. Reporting to and communicating with the European Commission will be done by the Italian Civil Protection Department. On several occasions the results and progress will be reported to the steering committee and the advisory body to collect feedback. The main tasks were divided as follows: Italian Civil Protection Department Coordinating Beneficiary Belgian Federal Public Service of Health Project Management Danish Emergency Management Agency Logistics Estonian Health Board Healthcare French DG for Civil Protection and Crisis Management Governance Project Management, Administration Johanniter-Unfall-Hilfe Germany and Finances IT Assistance for medical treatment and Leipzig University digital common patient record Romanian Department for Emergency Situations / Staff, Training and Exercise Ministry of Internal Affairs Asociácia Samaritánov Slovenskej Republiky, Slovak Support in all relevant tasks Republic 19 Although most tasks have different starting dates, they will all proceed until the end of the project. This is important to ensure that feedback from a certain task is incorporated in the end result of the other tasks. Since it is important to keep an overview, the project management will cover the whole time frame of the project. The project will start by studying the government for the structure. Shortly after the health care task will start, followed by logistics and finally staff, training and exercise. The project will end with delivery of a final report, and considerations on sustainability. .1/1/201?· 3i/i2/iOia StakeMdera Workshop Workshop on Logistics Workshop 1 on Governance ■ SteeringCommiteemeetingS Steering Commttteemeeting2 Workshop 1 on Staff, Training and Exercise Final Meeting: Steering Committee Kick-off meetings Steering meetings Committee meetingl Workshopl on Healthcare Workshop 2 on Governance Workshop 2 on Healthcare Steering Committee meeting 4 2017 2018 7. Monitoring and risks mitigation Explain how you will monitor the project and ensure timely and proper implementation. Describe what are the risks that could jeopardise the successful project implementation and how do you plan to mitigate those risks. The following monitoring activities will be conducted: • Monthly project updates through video-/phone-conferences where task implementation, activities and potential risks will be discussed • Monthly reporting through management reports, which will be submitted by each team leader to the Project Manager including descriptions of work done and work planned as well as their time sheets • Regular progress meetings to review the project implementation, documentation and deliverables • Regular steering committee meetings for strategic decisions, monitoring, evaluating and planning of the main areas of the project • Each of the team leaders is responsible for the timely deliveries of his team’s expected results and will monitor progress consistently 20 » Budget has been drafted on most recent insights and previous projects.Johanniter Germany will be responsible to follow up the financial projectimplementatlon • Invitation of relevant stakeholders to a preliminary workshop with the aim of early inclusion in the project, and motivated involvement in project development and implementation • Objectives have been carefully chosen because of the complexity of the project. Every task and activity has tťs own responsible organisation appointed. The project management team will foliový up on progression »The shared-responsibility projectteam structure ensures responsibility is shared equally between alt project partners. The project management team is responsible to ensure methodology is followed. • Experienced medical teams are involved in the development ofthe project to ensure compliance and interoperability. The advisory team wiii ensure used equipment and standards are at the right level. • Several of the consortium partners are national competent authorities and will follow up closely on any changes. ^ " 8. Evaluation Explain how you will evaluate the results during and after the implementation of the actions. In particular, explain which indicators (qualitative and quantitative) will be used and explain how you will monitor and check the financial Implementation of the project Evaluation of the project results will be conducted by a dedicated Project Quality Manager (tbd). At the beginning of the project, a project quality plan will be defined with a set of activities that help achieve quality in the project being executed. These activities are defined on the basis of the quality standards set by the consortium partners. The project quality plan identifies which quality standards are relevant to the project and determines how they can be achieved. It includes the implementation of quality events (peer reviews, checklist execution) by using various quality materials (templates, standards, checklists) available within the beneficiary’s organisations and/or from previous projects. Besides this there is an advisory board with relevant organisations that will ensure the use of the outcome of the project is up to standard. The Steering Committee, during their meetings, will be responsible to monitor and control the quality of the project using these quality materials. As an output of these various activities, quality measurements are captured which assist in continuous improvement of quality thus adding to the inventory of lessons learned. Major quality criteria are technical performance (deliverables achieved as planned), financial performance (budget spent as planned), schedule performance (compliance with project schedule), interoperability, transparency, reliability, and accountability. 21 The financial implementation of the project will be managed by Johanniter-Unfall-Hilfe Germany with the aim of ensuring that all project deliverables will be reached in a cost-saving and efficient way (e.g. all transactions have to be approved by Johanniter Germany and the Project Manager). 9. Cost efficiency and value for money Demonstrate that your project represents a good value for money and that you aimed for cost efficiency in the estimated budget. You may include any comments of the horizontal nature in relation to the items presented in the estimated budget. The project budget has been drafted carefully based on previous and current projects, integrating lessons learned, and with the purpose of receiving best value for money. EUMFH does not aim at purchasing lots of materials; the focus is rather to make best use of the existing EU-financed equipment (from existing medical and other modules/teams) and to enhance existing teams in cooperating with each other to achieve the highest possible outcome. Project meetings, training courses and other “physical” meetings are designed and planned in such a way, that the lowest possible travel and subsistence costs occur (e.g. all trainings and the exercise will be conducted in the most cost efficient way in order to reduce the overall accommodation and subsistence costs; meetings will be held primarily via phone-/video- conference where possible). All possibilities will be explored to integrate the exercise included in the EUMFH-project in an already planned Modex- or Full Scale exercise, thus reducing the cost while adding value for both. Each of the partners brings in a large amount of in-kind contribution into the project (e.g. personnel working time), thus elevating the value of the overall project while guaranteeing cost efficiency. 10. European dimension Demonstrate the European dimension and relevance of the project. There must be an added value in developing and implementing the action in a transnational partnership at international level rather than at national level. Please note that the ELI funding should complement existing actions/projects and not duplicate activities. The EUMFH-project aims at developing a new concept as an answer to a proven need in the field: the lack of level 3 Emergency Medical Teams that can stay active for a longer time period. The overall objective of the project is to clear the way for a multinational deployment where costs and responsibilities can be shared amongst several Member States. The EUMFH will be rapid-deployable with a backbone structure that can gradually grow to a fully equipped and staffed field hospital with a high standard of care, making efficient and qualitative use of Europe’s knowledge and experience. The facility can thus be used as a referral centre for other modules in the UCPM and other actors in the field. 22 The project makes efficient use of experience that was gathered in previous deployments of other Member States, integrating this in the most appropriate answer to the current guidelines and standards and, most important, to the needs in the field. 11. Strategies for dissemination Explain your plans for dissemination of the results. Describe how the knowledge gathered/ generated during the project will be transferred outside the partnership. For dissemination of the results of the project, the following activities are planned: coordination, preparation and review of dissemination material like the project website, Facebook page, Twitter account, flyer, brochures, presentations, press releases and a press meeting. The main purpose of the project website, Facebook page and Twitter account is to present the EUMFH project and the participating organisations, to publish those results of the project that are intended for the public (e.g. flyer, brochure, Standard Operating Procedures, etc.) and to provide a platform for knowledge exchange for both team members and other interested parties. A project flyer will be designed and printed to be distributed in meetings, conferences, exercises and trainings by representatives of the organisations or by members of the EUMFH team. Potential occasions for presenting the project are the European Civil Protection Forum and the annual Humanitarian Networks and Partnerships week organised by the United Nations’ Office for Coordination of Humanitarian Affairs in Geneva, or by inviting observers to the training and the exercise. At the end of the project, an 8-12-page layman’s report (in the form of a brochure) will be distributed widely after the project’s end. Regular press releases will be issued to local, national and European press before or after important milestones of the project, like the stakeholders’ workshop, the team trainings or the exercise. Additionally, these press releases are posted on all participating organisation’s websites as well as the project website. One of the trainings or the exercise will represent a suitable background for the conduct of a press meeting, where local and national media will be invited and the EUMFH project and its objectives and the team are presented. Through these various dissemination activities, the concept will be widely spread and can easily be reproduced by other interested authorities. 23 12. Sustainability Although a project is by definition limited in time, the aim is to make the results sustainable. Present the plan to ensure the financial and technical sustainability of the project. (If applicable) As in previous projects, a sustainable and long lasting integration of the project results is an underlying principle of all project partners. A sustainability concept will be drafted to make sure that each of the partners can integrate it into their own disaster response concept. There are several aspects to project sustainability that will be taken into consideration: • Using the results of this project for future projects • Equitable sharing and distribution of project results • Institutional stability (continuous management support) Technical sustainability will be achieved through developing procedures and means for maintaining training standards. The project team’s overall vision is that this project can be the source of a group of following activities and projects, leading to the growth of the Union Civil Protection Mechanism’s medical response to be a worldwide example. 13. External budget proposal Please specify which country/ies are the primary beneficiary of the project and describe their role. 14. Spatial data Please indicate whether electronic tools containing spatial data1 - any data with a direct or indirect reference to a specific location or geographical area - will be produced during this project. Directive 2007/2/EC of the European Parliament and of the Council of 14 March 2007 establishing an Infrastructure for Spatial Information in the European Union (INSPIRE) (OJ L 108, 25.4.2007, p. 1). 24 15. Subcontracting Please provide a list of all the tasks that will be subcontracted, including the information on the relevant provider and procedure. Having regard to the nature of the action and what is necessary for its implementation, explain as well the added-value of the subcontracting (information to be in line with the information provided in form F5). Several but rather limited parts of tasks will be subcontracted: • The project will use the knowledge and know-how of experienced medical staff and other experts from different organisations involved in international medical relief. This will be done, amongst others, via the non-profit organisation “International Disaster and Emergency Management Support” (IDEMS). The concerned staff will be mainly involved in the trainings and the exercise, but also provide their advice on other topics in the project. • There will be a cooperation with “Campus Vesta”, the school for Emergency Services in the Belgian Province of Antwerp. They will provide experts and the premises of the school can be used during the both trainings. • The others tasks to be subcontracted are the development of a project video and the project website. 25 26 Agreement number: EC HO/S U B/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016 ANNEX II GENERAL CONDITIONS PART A - LEGAL AND ADMINISTRATIVE PROVISIONS ARTICLE ILI - DEFINITIONS The following definitions (indicated in italics in the text) apply for the purpose of the Agreement: ‘Action’: the set of activities/ the project, for which the grant is awarded, to be implemented by the beneficiaries as described in Annex I. ‘Confidential information or document’: any information or document (in any format) received by either party from the other or accessed by either party in the context of the implementation of the Agreement that any of the parties has identified in writing as confidential. It does not include information that is publicly available. ‘Conflict of interests’: a situation where the impartial and objective implementation of the Agreement by a beneficiary is compromised for reasons involving family, emotional life, political or national affinity, economic interest, or any other shared interest with the Commission or any third party related to the subject matter of the Agreement. ‘Direct costs’: those specific costs which are directly linked to the implementation of the action and can therefore be attributed directly to it. They may not include any indirect costs; -‘Force majeure’: any unforeseeable, exceptional situation or event beyond the control of the parties that prevents either of them from fulfilling any of their obligations under the Agreement, which is not attributable to error or negligence on their part or on the part of the subcontractors affiliated entities or third parties in receipt of financial support and which proves to be inevitable despite their exercising due diligence. The following cannot be invoked as force majeure: labour disputes, strikes, financial difficulties or any default of a service, defect in equipment or material or delays in making them available, unless they stem directly from a relevant case of force majeure; ‘Formal notification’: form of communication between the parties made in writing by mail or electronic mail which provides the sender with a compelling evidence that the message was delivered to the specified recipient; ‘Fraud’: any intentional act or omission affecting the Union’s financial interests relating to the use or presentation of false, incorrect or incomplete statements or documents, to non­ disclosure of information in violation of a specific obligation; ‘Implementation period’: the period of implementation of the activities forming part of the action as specified in Article 1.2.2; ‘Indirect costs’: those costs which are not specific costs directly linked to the implementation of the action and can therefore not be attributed directly to it. They may not include any costs identifiable or declared as eligible direct costs; 27 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 ‘Irregularity’: any infringement of a provision of Union law resulting from an act or omission by a beneficiary, which has, or would have, the effect of prejudicing the Union’s budget; ‘Maximum amount of the grant’: the maximum EU contribution to the action as defined in Article 1.3.1; ‘Pre-existing material’: any material, document, technology or know-how which exists prior to the beneficiary using it for the production of a result in the implementation of the action; ‘Pre-existing right’: any industrial and intellectual property right on pre-existing material; it may consist in right of ownership, licence right and/or right of use belonging to the beneficiary or any other third parties; ‘Related person’: any person who has the power to represent the beneficiary or to take decisions on its behalf; ‘Starting date’: the date on which the implementation of the action starts as provided for in Article 1.2.2; ‘Subcontract’: a procurement contract within the meaning of Article 11.10, which covers the implementation by a third party of tasks forming part of the action as described in Annex I; ‘Substantial error’: any infringement of a provision of an agreement resulting from an act or omission, which causes or might cause a loss to the Union’s budget. ARTICLE II.2 - GENERAL OBLIGATIONS AND ROLES OF THE BENEFICIARIES 11.2.1 General obligations and role of the beneficiaries The beneficiaries: (a) are jointly and severally liable for carrying out the action in accordance with the Agreement. If a beneficiary fails to implement its part of the action, the other beneficiaries become responsible for implementing this part (without so increasing the maximum amount of the grant); (b) must comply jointly or individually with any legal obligations they are bound by under applicable EU, international and national law; (c) must make appropriate internal arrangements for the proper implementation of the action, consistent with the provisions of the Agreement; where provided for in the Special Conditions, those arrangements must take the form of an internal co-operation agreement between the beneficiaries. 11.2.2 General obligations and role of each beneficiary Each beneficiary must: 28 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 (a) inform the coordinator immediately of any events or circumstances likely to affect or delay the implementation of the action of which the beneficiary is aware; (b) inform the coordinator immediately: of any change in its legal, financial, technical, organisational or ownership situation and of any change in its name, address or legal representative; of any change in the legal, financial, technical, organisational or ownership situation of its affiliated entities and of any change in their name, address or legal representative; (c) submit in due time to the coordinator: (i) the data needed to draw up the reports, financial statements and other documents provided for in the Agreement; (ii) all the necessary documents in the event of audits, checks or evaluation in accordance with Article ÍI.27. (iii) any other information to be provided to the Commission according to the Agreement, except if the Agreement requires such information to be submitted directly by the beneficiary. II.2.3 General obligations and role of the coordinator The coordinator: (a) must monitor that the action is implemented in accordance with the Agreement; (b) is the intermediary for all communications between the beneficiaries and the Commission, except if provided otherwise in the Agreement, and, in particular, the coordinator : (i) must immediately inform the Commission: - of any change in the name, address, legal representative of any of the beneficiaries or of their affiliated entities; - of any change in the legal, financial, technical, organisational or ownership situation of any of the beneficiaries or of their affiliated entities; - of any events or circumstances likely to affect or delay the implementation of the action, of which the coordinator is aware. (ii) is responsible for supplying all documents and information required under the Agreement to the Commission, except if provided otherwise in the Agreement; where information is required from the other beneficiaries, the coordinator is responsible for obtaining and verifying this information before passing it on to the Commission; 29 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 (c) must make the appropriate arrangements for providing any financial guarantees required under the Agreement; (d) must establish the requests for payment in accordance with the Agreement; (e) where it is designated as the sole recipient of payments on behalf of all of the beneficiaries, must ensure that all the appropriate payments are made to the other beneficiaries without unjustified delay; (f) is responsible for providing all the necessary documents in the event of checks and audits initiated before the payment of the balance, and in the event of evaluation in accordance with Article 11.27. The coordinator may not subcontract any part of its tasks to the other beneficiaries or to any other party. ARTICLE II.3 - COMMUNICATIONS BETWEEN THE PARTIES 11.3.1 Form and means of communications Any communication relating to the Agreement or to its implementation must: (a) be made in writing (in paper or electronic form), (b) bear the number of the Agreement and (c) be made using the communication details identified in Article 1.7. If a party requests written confirmation of an electronic communication within a reasonable time, the sender must provide an original signed paper version of the communication as soon as possible. 11.3.2 Date of communications Any communication is considered to have been made when the receiving party receives it, unless the agreement refers to the date when the communication was sent. E-mail is considered to have been received by the receiving party on the day of dispatch of that e-mail, provided that it is sent to the e-mail address indicated in Article 1.7. The sending party must be able to prove the date of dispatch. In case of non-delivery report, the sending party must make every effort to ensure the actual receipt of the communication by the other party by e-mail or mail. In such a case, the sending party is not held in breach of its obligation to send such communication within a specified deadline. Mail sent to the Commission using the postal or courier services is considered to have been received by the Commission on the date on which it is registered by the department identified in Article 1.7.2. Formal notifications are considered to have been received by the receiving party on the date of receipt indicated in the proof received by the sending party that the message was delivered to the specified recipient. Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 ARTICLE II.4 - LIABILITY FOR DAMAGES 11.4.1 The Commission may not be held liable for any damage caused or sustained by any of the beneficiaries, including any damage caused to third parties as a consequence of or during the implementation of the action. 11.4.2 Except in cases of force majeure, the beneficiaries must compensate the Commission for any damage it sustains as a result of the implementation of the action or because the action was not implemented in full compliance with the Agreement. ARTICLE IL5 - CONFLICT OF INTERESTS 11.5.1 The beneficiaries must take all necessary measures to prevent any situation of conflict of interests. 11.5.2 The beneficiaries must inform the Commission without delay of any situation constituting or likely to lead to a conflict of interests. They must take immediately all the necessary steps to rectify this situation. The Commission may verify that the measures taken are appropriate and may require additional measures to be taken by a specified deadline. ARTICLE II.6 - CONFIDENTIALITY 11.6.1 During implementation of the action and for five years after the payment of the balance, the parties must treat with confidentiality any confidential information and documents. 11.6.2 The parties may not use confidential information and documents for any reason other than fulfilling their obligations under the Agreement without the prior written agreement of the other party. 11.6.3 The confidentiality obligations do not apply if: (a) the disclosing party agrees to release the other party from those obligations; (b) the confidential information or documents become public through other means than in breach of the confidentiality obligations; (c) the disclosure of the confidential information or documents is required by law. ARTICLE II.7 - PROCESSING OF PERSONAL DATA II.7.1 Processing of personal data by the Commission Any personal data included in the Agreement must be processed by the Commission in accordance with Regulation (EC) No 45/20013. 3 Regulation (EC) No 45/2001 of the European Parliament and of the Council of 18 December 2000 on the protection of individuals with regard to the processing of personal data by the Community institutions and bodies and on the free movement of such data. 31 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 Such data must be processed by the data controller identified in Article 1.7.1 solely for the purposes of the implementation, management and monitoring of the Agreement or protecting the financial interests of the EU, including checks, audits and investigations in accordance with Article 11.27. The beneficiaries have the right to access and correct their own personal data. For this purpose, they must send any queries about the processing of their personal data to the data controller identified in Article 1.7.1. The beneficiaries may have recourse at any time to the European Data Protection Supervisor. II.7.2 Processing of personal data by the beneficiaries The beneficiaries shall process personal data under the Agreement in compliance with applicable EU and national law on data protection (including authorisations or notification requirements). The beneficiaries may grant their personnel access only to data that is strictly necessary for implementing, managing and monitoring the Agreement. The beneficiaries must adopt appropriate technical and organisational security measures having regard to the risks inherent in the processing and to the nature of the personal data concerned, in order to: (a) prevent any unauthorised person from gaining access to computer systems processing personal data, and especially: (i) unauthorised reading, copying, alteration or removal of storage media; (ii) unauthorised data input as well as any unauthorised disclosure, alteration or erasure of stored personal data; (iii) unauthorised use of data-processing systems by means of data transmission facilities; (b) ensure that authorised users of a data-processing system can access only the personal data to which their access right refers; (c) record which personal data have been communicated, when and to whom; (d) ensure that personal data processed on behalf of third parties can be processed only in the manner prescribed by the Commission; (e) ensure that, during communication of personal data and transport of storage media, the data cannot be read, copied or erased without authorisation; (f) design their organisational structure in such a way that it meets data protection requirements. ARTICLE II.8 - VISIBILITY OF UNION FUNDING II.8.1 Information on Union funding and use of European Union emblem Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 Unless the Commission requests or agrees otherwise, any communication or publication related to the action, made by the beneficiaries jointly or individually, including at conferences, seminars or in any information or promotional materials (such as brochures, leaflets, posters, presentations, in electronic form, etc.), must: (a) indicate that the action has received funding from the Union and (b) display the European Union emblem. When displayed in association with another logo, the European Union emblem must have appropriate prominence. The obligation to display the European Union emblem does not confer to the beneficiaries a right of exclusive use. The beneficiaries may not appropriate the European Union emblem or any similar trademark or logo, either by registration or by any other means. For the purposes of the first, second and third subparagraphs and under the conditions specified therein, the beneficiaries may use the European Union emblem without first obtaining permission from the Commission. II.8.2 Disclaimers excluding Commission responsibility Any communication or publication related to the action, made by the beneficiaries jointly or individually in any form and using any means, must indicate: (a) that it reflects only the author’s view; and (b) that the Commission is not responsible for any use that may be made of the information it contains. ARTICLE II.9- PRE-EXISTING RIGHTS AND OWNERSHIP AND USE OF THE RESULTS (INCLUDING INTELLECTUAL AND INDUSTRIAL PROPERTY RIGHTS) 11.9.1 Ownership of the results by the beneficiaries Unless stipulated otherwise in the Agreement, the beneficiaries retain ownership of the results of the action, including industrial and intellectual property rights, and of the reports and other documents relating to it. 11.9.2 Pre-existing rights On written request of the Commission, specifying which of the results the Commission intends to use, the beneficiaries must: (a) establish a list specifying all pre-existing rights included in those results and (b) provide this list to the Commission at the latest with the request for payment of the balance. The beneficiaries must ensure that they or their affiliated entities have all the rights to use any pre-existing rights during the implementation of the Agreement. 11.9.3 Rights of use of the results and of pre-existing rights by the Union 33 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 The beneficiaries grant the Union the following rights to use the results of the action: (a) use for its own purposes, and in particular, making available to persons working for the Commission, other Union institutions, agencies and bodies and to Member States’ institutions, as well as, copying and reproducing in whole or in part and in unlimited number of copies; (b) reproduction: the right to authorise direct or indirect, temporary or permanent reproduction of the results by any means (mechanical, digital or other) and in any form, in whole or in part; (c) communication to the public: the right to authorise any display performance or communication to the public, by wire or wireless means, including the making available to the public of the results in such a way that members of the public may access them from a place and at a time individually chosen by them; this right also includes the communication and broadcasting by cable or by satellite; (d) distribution: the right to authorise any form of distribution of results or copies of the results to the public; (e) adaptation: the right to modify the results; (f) translation; (g) the right to store and archive the results in line with the document management rules applicable to the Commission, including digitisation or converting the format for preservation or new use purposes; (h) where the results are documents, the right to authorise the reuse of the documents in conformity with the Commission Decision of 12 December 2011 on the reuse of Commission documents (2011/833/EU), to the extent it is applicable and the documents fall within its scope and are not excluded by any of its provisions; for the sake of this provision, "reuse" and "document" have the meaning given to it by this Decision. The above rights of use may be further specified in the Special Conditions. Additional rights of use for the Union may be provided for in the Special Conditions. The beneficiaries must ensure that the Union has the right to use any pre-existing rights included in the results of the action. Unless specified otherwise in the Special Conditions, the pre-existing rights must be used for the same purposes and under the same conditions as applicable to the rights of use of the results of the action. Information about the copyright owner must be inserted when the result is divulged by the Union. The copyright information must read: ‘© - year - name of the copyright owner. All rights reserved. Licenced to the European Union under conditions.’. Granting rights of use to the Commission does not affect its confidentiality obligations under Article II.6 nor the obligation of the beneficiaries under Article II.3.1. 34 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 ARTICLE 11.10 - AWARD OF CONTRACTS NECESSARY FOR THE IMPLEMENTATION OF THE ACTION 11.10.1 Where the implementation of the action requires the procurement of goods, works or services, the beneficiaries must award the contract to the tender offering best value for money or, as appropriate, to the tender offering the lowest price. In doing so, they must avoid any conflict of interests. The beneficiaries must ensure that the Commission, the European Court of Auditors and the European Anti-Fraud Office (OLAF) can exercise their rights under Article 11.27 also towards their contractors. 11.10.2 Beneficiaries that are ‘contracting authorities’ within the meaning of Directive 2004/18/EC4 or ‘contracting entities’ within the meaning of Directive 2004/17/EC5 must comply with the applicable national public procurement rules. The beneficiaries must ensure that the conditions applicable to them under Articles II.4, II.5, II.6 and II.9 are also applicable to the contractor. II. 10.3 The beneficiaries remain solely responsible for carrying out the action and for compliance with the provisions of the Agreement. II.10.4. If the beneficiaries breach their obligations under Article 11.10.1 the costs related to the contract concerned are considered ineligible in accordance with Article II. 19.2 (c),_(d) and (e). If the beneficiaries breach their obligations under Article II. 10.2 the grant may be reduced in accordance with Article II.25.4. ARTICLE 11.11 - SUBCONTRACTING OF TASKS FORMING PART OF THE ACTION II.ll.l Beneficiaries may subcontract tasks forming part of the action, provided that, in addition to the conditions specified in Article 11.10, the following conditions are complied with: (a) subcontracting does not cover core tasks of the action; (b) recourse to subcontracting is justified having regard to the nature of the action and what is necessary for its implementation; (c) the estimated costs of the subcontracting are clearly identifiable in the estimated budget set out in Annex III; (d) any recourse to subcontracting, if not provided for in Annex I, is communicated by the coordinator and approved by the Commission. Such an approval may be given by the Commission: 4 Directive 2004/18/EC of the European Parliament and of the Council of 31 March 2004 on the coordination of procedures for the award of public work contracts, public supply contracts and public service contracts 5 Directive 2004/17/EC of the European Parliament and of the Council of 31 March 2004 coordinating the procurement procedures of entities operating in the water, energy, transport and postal services sectors 35 Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016 (i) before any recourse to subcontracting, if the beneficiaries request an amendment in accordance with Article 11.13 or (ii) after recourse to subcontracting if it: - is specifically justified in the interim or final technical report referred to in Articles 1.4.3 and 1.4.4 and - does not entail changes to the Agreement which would call into question the decision awarding the grant or breach the principle of equal treatment of applicants; (e) the beneficiaries ensure that the conditions applicable to them under Article II. 8 are also applicable to the subcontractor. 11.11.2 If the beneficiaries breach their obligations under Article ILI 1.1 (a), (b), (c) or (d), the costs related to the contract concerned are considered ineligible in accordance with Article II. 19.2 (f). If the beneficiaries breach their obligation under Article II. 11.1 (e) the grant may be reduced in accordance with Article II.25.4. ARTICLE 11.12 - FINANCIAL SUPPORT TO THIRD PARTIES II. 12.1 Where the implementation of the action requires giving financial support to third parties, the beneficiaries must give such financial support in accordance with the conditions specified in Annex I, which must at least contain: (a) the maximum amount of financial support; This amount may not exceed EUR 60 000 for each third party except where the financial support is the primary aim of the action as specified in Annex I; (b) the criteria for determining the exact amount of the financial support; (c) the different types of activity that may receive financial support, on the basis of a fixed list; (d) the definition of the persons or categories of persons which may receive financial support; (e) the criteria for giving the financial support. 11.12.2 As an exception to Article II. 12.1, in case the financial support takes the form of a prize, the beneficiaries must give such financial support in accordance with the conditions specified in Annex I, which must at least contain: (a) the conditions for participation; (b) the award criteria; (c) the amount of the prize; (d) the payment arrangements. 36 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 11.12.3 The beneficiaries must ensure that the conditions applicable to them under Articles II.4, II.5, II.6, II.8, II.9 and 11.27 are also applicable to the third parties receiving financial support. ARTICLE 11.13 - AMENDMENTS TO THE AGREEMENT Í1.13.1 Any amendment to the Agreement must be made in writing. II.13.2 An amendment may not have the purpose or the effect of making changes to the Agreement which would call into question the decision awarding the grant or be contrary to the equal treatment of applicants. II. 13.3 Any request for amendment must: (a) be duly justified (b) be accompanied by appropriate supporting documents and (c) be sent to the other party in due time before it is due to take effect, and in any case one month before the end of the implementation period. Point (c) does not apply in cases duly substantiated by the party requesting the amendment if the other party agrees. 11.13.4 A request for amendment on behalf of the beneficiaries must be submitted by the coordinator. If a change of coordinator is requested without its agreement, the request must be submitted by all other beneficiaries and must be accompanied by the opinion of the coordinator or proof that this opinion has been requested in writing. 11.13.5 Amendments enter into force on the date on which the last party signs or on the date of approval of the request for amendment. Amendments take effect on a date agreed by the parties or, in the absence of such an agreed date, on the date on which the amendment enters into force. ARTICLE 11.14 - ASSIGNMENT OF CLAIMS FOR PAYMENTS TO THIRD PARTIES 11.14.1 The beneficiaries may not assign any of their claims for payment against the Commission to any third party, except if approved by the Commission on the basis of a reasoned, written request by the coordinator made on behalf of the beneficiaries. If the Commission has not accepted the assignment or the terms of it are not observed, the assignment has no effect on it. 11.14.2 In no circumstances may an assignment release the beneficiaries from their obligations towards the Commission. ARTICLE 11.15 - FORCE MAJEURE H.15.1 A party faced with force majeure must send a formal notification to the other party without delay, stating the nature of the situation or of the event, its likely duration and foreseeable effects. 37 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 11.15.2 The parties must take the necessary measures to limit any damage due to force majeure. They must do their best to resume the implementation of the action as soon as possible. 11.15.3 The party faced with force majeure may not be considered in breach of its obligations under the Agreement if it has been prevented from fulfilling them by force majeure. ARTICLE 11.16 - SUSPENSION OF THE IMPLEMENTATION OF THE ACTION IL16.1 Suspension of the implementation by the beneficiaries The coordinator, on behalf of the beneficiaries, may suspend the implementation of the action or any part of it, if exceptional circumstances make such implementation impossible or excessively difficult, in particular in the event offorce majeure. The coordinator must immediately inform the Commission stating: (a) the reasons for suspension including details about the date or period when the exceptional circumstances occurred; and (b) the expected date of resumption. Once the circumstances allow resuming the implementation of the action the coordinator must inform the Commission immediately and present a request for amendment of the Agreement as provided for in Article II. 16.3. This obligation does not apply if the Agreement or the participation of a beneficiary is terminated in accordance with Articles II. 17.1, II. 17.2 or points (c) or (d) of Article II.17.3.1. II.16.2Suspension of the implementation by the Commission II.16.2.1 Grounds for suspension The Commission may suspend the implementation of the action or any part thereof: (a) if the Commission has evidence that a beneficiary has committed substantial errors, irregularities or fraud in the award procedure or in the implementation of the Agreement or if a beneficiary fails to comply with its obligations under the Agreement; (b) if the Commission has evidence that a beneficiary has committed, in other grants funded by the Union or the European Atomic Energy Community (‘Euratom’) awarded to the beneficiary under similar conditions, systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant; or (c) if the Commission suspects substantial errors, irregularities, fraud or breach of obligations committed by a beneficiary in the award procedure or in the implementation of the Agreement and needs to verify whether they have actually occurred. H.16.2.2 Procedure for suspension 38 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 Step 1 - Before suspending implementation of the action, the Commission must send a formal notification to the coordinator: (a) informing it of: (i) its intention to suspend the implementation; (ii) the reasons for suspension; (iii) in the cases referred to in points (a) and (b) of Article II. 16.2.1, the necessary conditions for resuming the implementation, and (b) inviting it to submit observations within 30 calendar days of receiving the formal notification. Step 2- If the Commission does not receive observations or decides to pursue the procedure despite the observations it has received, it must send a formal notification to the coordinator informing it of: (a) the suspension of the implementation; (b) the reasons for suspension; and (c) in the cases referred to in points (a) and (b) of Article II. 16.2.1, the final conditions for resuming the implementation; or (d) in the case referred to in point (c) of Article II. 16.2.1, the indicative date of completion of the necessary verification. The coordinator must immediately inform the other beneficiaries of the suspension. The suspension takes effect five calendar days after the formal notification is received by the coordinator or on a later date specified in the formal notification. Otherwise, the Commission must send a formal notification to the coordinator informing it that the suspension procedure is not continued. 11.16.2.3 Resuming the implementation In order to resume the implementation, the beneficiaries must endeavour to meet the notified conditions as soon as possible and must inform the Commission of any progress made. If the conditions for resuming the implementation are met or the necessary verifications are carried out, the Commission must send a formal notification to the coordinator: (a) informing it that the conditions for lifting the suspension are met and (b) inviting it to present a request for amendment of the Agreement as provided for in Article II. 16.3. This obligation does not apply if the Agreement or the participation of a beneficiary is terminated in accordance with Articles 11.17.1, II. 17.2 or points (c), (g) or (h) of Article II. 17.3.1. 11.16.3 Effects of the suspension If the implementation of the action can be resumed and the Agreement is not terminated, an amendment to the Agreement must be made in accordance with Article 11.13 in order to: (a) set the date on which the action is to be resumed; 39 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 (b) extend the duration of the action; and (c) make other changes necessary to adapt the action to the new situation. The suspension is lifted with effect from the resumption date set out in the amendment. This date may be before the date on which the amendment enters into force. Costs incurred during the period of suspension, for the implementation of the suspended action or the suspended part of it, may not be reimbursed or covered by the grant. Suspension of the action implementation does not affect the Commission’s right to terminate the Agreement or participation of a beneficiary in accordance with Article II. 17.3, reduce the grant or recover amounts unduly paid in accordance with Articles II.25.4 and 11.26. Neither party may claim damages due to suspension by the other party. ARTICLE 11.17 - TERMINATION OF THE AGEEMENT II.17.1 Termination of the Agreement by the coordinator The beneficiaries may terminate the Agreement. The coordinator must send a formal notification of termination to the Commission, stating: (a) the reasons for termination and (b) the date on which the termination takes effect. This date must be set after the formal notification. If no reasons are given or if the Commission considers the reasons do not justify termination, the Agreement is considered to have been terminated improperly. The termination takes effect on the day specified in the formal notification. II.17.2Termination of the participation of one or more beneficiaries by the coordinator The participation of one or more beneficiaries may be terminated by the coordinator, on request of the beneficiary concerned or on behalf of the other beneficiaries. The coordinator must send a formal notification of termination to the Commission and inform the beneficiary concerned by termination. If the coordinator’s participation is terminated without its agreement, the formal notification must be submitted by another beneficiary (acting on behalf of the other beneficiaries). The formal notification must include: (a) the reasons for termination; (b) the opinion of the beneficiary concerned by termination (or proof that this opinion has been requested in writing); (c) the date on which the termination takes effect. This date must be set after the formal notification, and 40 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 (d) a request for amendment in accordance with Article 11.17.4.2(a). If no reasons are given or if the Commission considers that the reasons do not justify termination, the participation will be considered to have been terminated improperly. The termination takes effect on the day specified in tht formal notification. II. 17.3 Termination of the Agreement or the participation of one or more beneficiaries by the Commission II.17.3.1 Grounds for termination The Commission may terminate the Agreement or the participation of any one or several beneficiaries, if: (a) a change to the beneficiary’s legal, financial, technical, organisational or ownership situation is likely to affect the implementation of the Agreement substantially or calls into question the decision to award the grant; (b) following the termination of the participation of any one or several beneficiaries, the necessary modifications to the Agreement would call into question the decision awarding the grant or would result in unequal treatment of applicants; (c) the beneficiaries do not implement the action as specified in Annex I or if a beneficiary fails to comply with another substantial obligation incumbent on it under the Agreement; (d) the implementation of the action is prevented or suspended due to force majeure or exceptional circumstances and either: (i) resumption is impossible, or (ii) the necessary changes to the Agreement would call into question the decision awarding the grant or breach the principle of equal treatment of applicants; (e) a beneficiary or any person that assumes unlimited liability for the debts of that beneficiary is subject to any of the situations provided for in points (a) or (b) of Article 106 (1) of the Financial Regulation6; (f) a beneficiary or any related person is subject to any of the situations provided for in points (c), (d), (e) or (f) of Article 106 (1) or to Article 106 (2) of the Financial Regulation; (g) the Commission has evidence that a beneficiary or any related person have committed substantial errors, irregularities or fraud in the award procedure or in the implementation of the Agreement, including in case of submission of false information or failure to provide required information; (h) the Commission has evidence that a beneficiary has committed, in other Union or Euratom grants awarded to it under similar conditions, systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant, or 6 Regulation (EU, Euratom) No 966/2012 of the European Parliament and of the Council of 25 October 2012 on the financial rules applicable to the general budget of the Union 41 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 (i) a beneficiary does not request an amendment to the Agreement to withdraw the participation of its affiliated entity which is in any of the situations provided for in points (f), (g) or (h) after having been requested to do so by the Commission through a formal notification. II.17.3.2 Procedure for termination Step 1- Before terminating the Agreement or participation of one or more beneficiaries, the Commission must send a formal notification to the coordinator: (a) informing it of: (i) its intention to terminate; (ii) the reasons for termination; and (b) inviting it, within 45 calendar days of receiving the formal notification,: (i) to submit observations on behalf of all beneficiaries and, (ii) in case of point (c) of Article 11.17.3.1, to inform the Commission of the measures to ensure compliance with the obligations under the Agreement. Step 2 > If the Commission does not receive observations or decides to pursue the procedure despite the observations it has received, it will send a formal notification to the coordinator informing it of the termination and the date on which it takes effect. The coordinator must immediately inform the other beneficiaries of the termination. Otherwise, the Commission must send a formal notification to the coordinator informing it that the termination procedure is not continued. The termination takes effect: (a) for terminations under points (a), (b), (c) and (e) of Article II. 17.3.1: on the day specified in the formal notification of termination referred to in the second sub­ paragraph (Step 2); (b) for terminations under points (d), (f), (g), (h) and (i) of Article II. 17.3.1: on the day after the formal notification of termination referred to in the second sub-paragraph (Step 2) is received by the coordinator. II. 17.4 Effects of termination II.17.4.1 For termination of the Agreement: Within 60 calendar days from the day on which the termination takes effect, the coordinator must submit a request for payment of the balance in accordance with Article 1.4.4. If the Commission does not receive the request for payment of the balance within the above deadline, only costs which are included in an approved technical report and, where relevant, in an approved financial statement, are reimbursed or covered by the grant. 42 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 If the Agreement is terminateci by the Commission for breach of the obligation to submit the request for payment, the coordinator may not submit any request for payment after termination. In that case the second subparagraph applies, The Commission calculates the final grant amount as referred to in Article 11.25 and the balance as referred to in Article 1.5.4 on the basis of the reports submitted. Only costs incurred until termination takes effect are reimbursed or covered by the grant. Costs relating to contracts due for execution only after termination are not taken into account. The Commission may reduce the grant in accordance with Article II.25.4. in case of: (a) improper termination of the Agreement by the coordinator within the meaning of Article II. 17.1; or (b) termination of the Agreement by the Commission on the grounds set out in points (c), (f), (g), (h) and (i) of Article II.17.3.1. Neither party may claim damages due to termination of the Agreement by the other party. After termination, the beneficiaries’ obligations, in particular those under Articles 1.4, II.6, II. 8, II.9, 11.14, 11.27 and any additional provisions on the use of the results as set out in the Special Conditions, continue to apply. II.17.4.2 For termination of the participation of one or more beneficiaries: a) The coordinator must submit a request for amendment including: (i) a proposal for reallocation of the tasks of the beneficiary or beneficiaries concerned by termination and, (ii) if necessary, the addition of one or more new beneficiaries to succeed the beneficiary or beneficiaries concerned in all their rights and obligations under the Agreement. In case of termination by the Commission, the request must be submitted within 60 calendar days from the day on which the termination takes effect. In case of termination by the coordinator, the request must be included in the formal notification of termination referred to in Article II. 17.2. If termination takes effect after the end of the implementation period, no request for amendment must be included, unless the beneficiary concerned is the coordinator. In this case, the request for amendment must propose a new coordinator. If the request for amendment is rejected by the Commission, the Agreement may be terminated according to Article II. 17.3.1 (b). The request for amendment may be rejected if it calls into question the decision awarding the grant or breaches the principle of equal treatment of applicants b) The beneficiary concerned by termination must submit to the coordinator: (i) a technical report and 43 Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016 (ii) a financial statement covering the period from the end of the last reporting period to the date when termination takes effect. This information must be included by the coordinator in the payment request for the next reporting period. Only costs incurred by the beneficiary concerned until termination takes effect are reimbursed or covered by the grant. Costs relating to contracts due for execution only after termination are not taken into account. The Commission may reduce the grant in accordance with Article 11.25.4. in case of: (a) improper termination of the participation of a beneficiary by the coordinator within the meaning of Article II. 17.2 or (b) termination of the participation of a beneficiary by the Commission on the grounds set out in points (c), (f), (g), (h) or (i) of Article 11.17.3.1. Neither party may claim damages due to termination by the other party. After termination, the concerned beneficiary’s obligations, in particular those under Articles I. 4, И.6, II.8, II.9,11.14,11.27 and any additional provisions on the use of the results as set out in the Special Conditions, continue to apply. ARTICLE 11.18 - APPLICABLE LAW, SETTLEMENT OF DISPUTES AND ENFORCEABLE DECISION II. 18.1 The Agreement is governed by the applicable Union law complemented, where necessary, by the law of Belgium. 11.18.2 In accordance with Article 272 TFEU, the General Court or, on appeal, the Court of Justice of the European Union has a sole jurisdiction to hear any dispute between the Union and any beneficiary concerning the interpretation, application or validity of the Agreement, if such dispute cannot be settled amicably. 11.18.3 In accordance with Article 299 TFEU, for the purposes of recoveries within the meaning of Article 11.26, the Commission may adopt an enforceable decision to impose pecuniary obligations on persons other than States. An action may be brought against such decision before the General Court of the European Union in accordance with Article 263 TFEU. Д4 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 PART B - FINANCIAL PROVISIONS ARTICLE 11.19 - ELIGIBLE COSTS II.19.1 Conditions for the eligibility of costs Eligible costs of the action are costs actually incurred by the beneficiary which meet the following criteria: (a) they are incurred within the implementation period, with the exception of costs relating to the request for payment of the balance and the corresponding supporting documents referred to in Article 1.4.4; (b) they are indicated in the estimated budget of the action set out in Annex III; (c) they are incurred in connection with the action as described in Annex I and are necessary for its implementation; (d) they are identifiable and verifiable, in particular being recorded in the accounting records of the beneficiary and determined according to the applicable accounting standards of the country where the beneficiary is established and with the usual cost accounting practices of the beneficiary; (e) they comply with the requirements of applicable tax and social legislation; and (f) they are reasonable, justified, and comply with the principle of sound financial management, in particular regarding economy and efficiency. II.19.2Eligible direct costs To be eligible, the direct cost of the action must comply with the conditions of eligibility set out in Article II. 19.1. In particular, the following categories of costs are eligible direct costs, provided that they satisfy the conditions of eligibility set out in Article II. 19.1 as well as the following conditions: (a) the costs of personnel working under an employment contract with the beneficiary or an equivalent appointing act and assigned to the action, provided that these costs are in line with the beneficiary’s usual policy on remuneration. Those costs include actual salaries plus social security contributions and other statutory costs included in the remuneration. They may also comprise additional remunerations, including payments on the basis of supplementary contracts regardless of the nature of those contracts, provided that they are paid in a consistent manner whenever the same kind of work or expertise is required, independently from the source of funding used; The costs of natural persons working under a contract with the beneficiary other than an employment contract or seconded to the beneficiary by a third party against payment may be assimilated to such costs of personnel, provided that the following conditions are fulfilled: (i) the natural person works under the instructions of the beneficiary and, unless otherwise agreed with the beneficiary, in the premises of the beneficiary; 45 Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016 (ii) the result of the work belongs to the beneficiary; and (iii) the costs are not significantly different from the costs of staff performing similar tasks under an employment contract with the beneficiary; (b) costs of travel and related subsistence allowances, provided that these costs are in line with the beneficiary’s usual practices on travel; (c) the depreciation costs of equipment or other assets (new or second-hand) as recorded in the accounting statements of the beneficiary, provided that the asset: (i) is written off in accordance with the international accounting standards and the usual accounting practices of the beneficiary and (ii) has been purchased in accordance with Article II. 10.1 if the purchase occurred within the implementation period; The costs of rental or lease of equipment or other assets are also eligible, provided that these costs do not exceed the depreciation costs of similar equipment or assets and are exclusive of any finance fee; Only the portion of the equipment’s depreciation, rental or lease costs corresponding to the implementation period and the rate of actual use for the purposes of the action may be taken into account. By way of exception, the Special Conditions may provide for the eligibility of the full cost of purchase of equipment, where justified by the nature of the action and the context of the use of the equipment or assets; (d) costs of consumables and supplies, provided that they: (i) are purchased in accordance with Article II. 10.1 and (ii) are directly assigned to the action·, (e) costs arising directly from requirements imposed by the Agreement (dissemination of information, specific evaluation of the action, audits, translations, reproduction), including the costs of requested financial guarantees, provided that the corresponding services are purchased in accordance with Article II. 10.1; (f) costs entailed by subcontracts within the meaning of Article 11.11, provided that the conditions laid down in Article II. 11.1 (a), (b), (c) and (d) are met; (g) costs of financial support to third parties within the meaning of Article 11.12, provided that the conditions laid down in that Article are met; (h) duties, taxes and charges paid by the beneficiary, notably value added tax (VAT), provided that they are included in eligible direct costs, and unless specified otherwise in the Agreement. II. 19.3 Eligible indirect costs Agreement number: ECHO/SU B/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016 To be eligible, indirect costs of the action must represent a fair apportionment of the overall overheads of the beneficiary and must comply with the conditions of eligibility set out in Article II. 19.1. Unless otherwise specified in the Article 1.3.2, eligible indirect costs must be declared on the basis of a flat rate of 7% of the total eligible direct costs. II.19.4 Ineligible costs In addition to any other costs which do not fulfil the conditions set out in Article II. 19.1, the following costs may not be considered eligible: . (a) return on capital and dividends paid by a beneficiary; (b) debt and debt service charges; (c) provisions for losses or debts; (d) interest owed; (e) doubtful debts; (f) exchange losses; (g) costs of transfers from the Commission charged by the bank of a beneficiary; (h) costs declared by the beneficiary in the framework of another action receiving a grant financed from the Union budget (including grants awarded by a Member State and financed from the Union budget and grants awarded by other bodies than the Commission for the purpose of implementing the Union budget); in particular, indirect costs may not be eligible under a grant for an action awarded to a beneficiary which already receives an operating grant financed from the Union budget during the period in question; (i) contributions in kind from third parties; (j) excessive or reckless expenditure; (k) deductible VAT. ARTICLE 11.20 - IDENTIFIABILITY AND VERIFIABILITY OF THE AMOUNTS DECLARED II.20.1 Declaring costs and contributions The beneficiary must declare as eligible costs or requested contribution: (a) for actual costs: the costs it actually incurred for the action·, (b) for unit costs or unit contributions: the amount obtained by multiplying the amount per unit specified in Article I.3.2(a)(ii) or (b) by the actual number of units used or produced; (c) for lump sum costs or lump sum contributions: the global amount specified in Article I.3.2(a)(iii) or (c), subject to the proper implementation of the corresponding tasks or part of the action as described in Annex I; (d) for flat-rate costs or flat-rate contributions: the amount obtained by applying the flat rate specified in Article I.3.2(a)(iv) or (d); (e) for unit costs declared on the basis of the beneficiary’s usual cost accounting practices: the amount obtained by multiplying the amount per unit calculated in accordance with its usual cost accounting practices by the actual number of units used or produced; 47 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 (f) for lump sum costs declared on the basis of the beneficiary’s usual cost accounting practices: the global amount calculated in accordance with its usual cost accounting practices, subject to the proper implementation of the corresponding tasks or part of the action·, (g) for flat-rate costs declared on the basis of the beneficiary’s usual cost accounting practices: the amount obtained by applying the flat rate calculated in accordance with its usual cost accounting practices. II.20.2Records and other documentation to support the costs and contributions declared If requested to do so in the context of the checks or audits described in Article 11.27, the beneficiary must provide: (a) for actual costs: adequate supporting documents to prove the costs declared, such as contracts, invoices and accounting records. In addition, the beneficiary’s usual accounting and internal control procedures must permit direct reconciliation of the amounts declared with the amounts recorded in its accounting statements as well as with the amounts indicated in the supporting documents; (b) for unit costs or unit contributions: adequate supporting documents to prove the number of units declared. The beneficiary does not need to identify the actual eligible costs covered or to provide supporting documents, notably accounting statements, to prove the amount declared per unit; (c) for lump sum costs or lump sum contributions: adequate supporting documents to prove the proper implementation. The beneficiary does not need to identify the actual eligible costs covered or to provide supporting documents, notably accounting statements, to prove the amount declared as lump sum; (d) for flat-rate costs or flat-rate contributions: adequate supporting documents to prove the eligible costs or requested contribution to which the flat rate applies. The beneficiary does not need to identify the actual eligible costs covered or to provide supporting documents, notably accounting statements, for the flat rate applied; (e) for unit costs declared on the basis of the beneficiary’s usual cost accounting practices: adequate supporting documents to prove the number of units declared; (f) for lump sum costs declared on the basis of the beneficiary’s usual cost accounting practices: adequate supporting documents to prove the proper implementation; (g) for flat-rate costs declared on the basis of the beneficiary’s usual cost accounting practices: adequate supporting documents to prove the eligible costs to which the flat rate applies. II.20.3 Conditions for compliance of the costs accounting practices 48 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 IL20.3.1 In the case of points (e), (f) and (g) of Article II.20.2, the beneficiary does not need to identify the actual eligible costs covered, but it must ensure that the cost accounting practices used for the purpose of declaring eligible costs are in compliance with the following conditions: (a) the cost accounting practices used constitute its usual cost accounting practices and are applied in a consistent manner, based on objective criteria independent from the source of funding; (b) the costs declared can be directly reconciled with the amounts recorded in its general accounts; and (c) the categories of costs used for the purpose of determining the costs declared are exclusive of any ineligible cost or costs covered by other forms of grant in accordance with Article 1.3.2. 11.20.3.2 If the Special Conditions provide so, the beneficiary may submit to the Commission a request for assessment of the compliance of its usual cost accounting practices. If required by the Special Conditions, the request must be accompanied by a certificate on the compliance of the cost accounting practices (‘certificate on the compliance of the cost accounting practices’). The certificate on the compliance of the cost accounting practices must be: (a) produced by an approved auditor or, in case of public bodies, by a competent and independent public officer and (b) drawn up in accordance with Annex VIII. The certificate must certify that the beneficiary’s cost accounting practices used for the purpose of declaring eligible costs comply with the conditions laid down in the first subparagraph and with the additional conditions which may be laid down in the Special Conditions. 11.20.3.3 Where the Commission has confirmed that the usual cost accounting practices of the beneficiary are in compliance, costs declared in application of these practices may not be challenged ex post, if: (a) the practices actually used comply with those approved by the Commission and (b) the beneficiary did not conceal any information for the purpose of their approval. ARTICLE 11.21 - ELIGIBILITY OF COSTS OF ENTITIES AFFILIATED TO THE BENEFICIARIES Where the Special Conditions contain a provision on entities affiliated to the beneficiaries, costs incurred by such an entity are eligible, if: (a) they satisfy the same conditions under Articles 11.19 and 11.20 as apply to the beneficiary, and (b) the beneficiary the entity is affiliated to ensures that the conditions applicable to the beneficiary under Articles II.4, II.5, II.6, II.8, ILIO, II. 11 and 11.27 are also applicable to the entity. 49 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries modei agreement: 2016 ARTICLE 11.22 - BUDGET TRANSFERS Beneficiaries are allowed to adjust the estimated budget set out in Annex III by transfers between themselves and between the different budget categories, if the action is implemented as described in Annex I. This adjustment does not require an amendment of the Agreement in accordance with Article 11.13. However, the beneficiaries may not add costs relating to subcontracts not provided for in Annex 1, unless such additional subcontracts are approved in accordance with Article II. 11.1(d). As an exception to the first subparagraph, should beneficiaries want to modify the value of the contribution that each of them is entitled to as referred to in point (c) of II.26.3, the coordinator must request an amendment in accordance with Article 11.13. The first three subparagraphs do not apply to amounts which, in accordance with Article I. 3.2(a)(iii) or (c), take the form of lump sums. ARTICLE 11.23 - NON COMPLIANCE WITH REPORTING OBLIGATIONS The Commission may terminate the Agreement in accordance with Article 11.17.3.1(c) and may reduce the grant in accordance with Article II.25.4 if the coordinator: (a) did not submit a request for interim payment or payment of the balance accompanied by the documents referred to in Articles 1.4.3 or 1.4.4 within 60 calendar days following the end of the corresponding reporting period, and (b) still fails to submit such a request within 60 calendar days following a written reminder sent by the Commission. ARTICLE 11.24 - SUSPENSION OF PAYMENTS AND OF TIME LIMIT FOR PAYMENT II. 24.1 Suspension of payments II.24.1.1 Grounds for suspension The Commission may at any moment suspend, in whole or in part, the pre-financing payment and interim payments for one or more beneficiaries or the payment of the balance for all beneficiaries: (a) if the Commission has evidence that a beneficiary has committed substantial errors, irregularities or fraud in the award procedure or in the implementation of the Agreement or if a beneficiary fails to comply with its obligations under the Agreement; (b) if the Commission has evidence that a beneficiary has committed, in other grants funded by the Union or the European Atomic Energy Community (‘Euratom’) awarded to the beneficiary under similar conditions, systemic or recurrent errors, irregularities, fraud or serious breach of obligations that have a material impact on this grant; or (c) if the Commission suspects substantial errors, irregularities, fraud or breach of obligations committed by a beneficiary in the award procedure or in the 50 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 implementation of the Agreement and needs to verify whether they have actually occurred. 11.24.1.2 Procedure for suspension Step 1 - Before suspending payments, the Commission must send a formal notification to the coordinator: (a) informing it of: (i) its intention to suspend payments, (ii) the reasons for suspension (iii) in the cases referred to in points (a) and (b) of Article 11.24.1.1, the necessary conditions for resuming payments and (b) inviting it to submit observations within 30 calendar days of receiving the formal notification. Step 2 - If the Commission does not receive observations or decides to pursue the procedure despite the observations it has received, it must send a formal notification to the coordinator informing it of: (a) the suspension of payments; (b) the reasons for suspension; (c) in the cases referred to in points (a) and (b) of Article 11.24.1.1, the final conditions for resuming the implementation; (d) in the case referred to in point (c) of Article 11.24.1.1, the indicative date of completion of the necessary verification. The coordinator must immediately inform the other beneficiaries of the suspension. The suspension takes effect on the day the formal notification of suspension (Step 2) is sent by the Commission. Otherwise, the Commission must send a formal notification to the coordinator informing it that the suspension procedure is not continued. 11.24.1.3 Effects of suspension During the period of suspension of payments the coordinator is not entitled to submit: (a) any requests for payments and supporting documents referred to in Articles 1.4.2,1.4.3 and 1.4.4 or, (b) where the suspension concerns the pre-financing payments or interim payments for one or several beneficiaries only, any requests for payments and supporting documents relating to the participation of the concerned beneficiary or beneficiaries in the action. The corresponding requests for payments and supporting documents may be submitted as soon as possible after resumption of payments or may be included in the first request for payment due following resumption of payments in accordance with the schedule laid down in Article 1.4.1. 51 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 The suspension of payments does not affect the right of the coordinator to suspend the implementation of the action in accordance with Article II. 16.1 or to terminate the Agreement or the participation of a beneficiary in accordance with Article II. 17.1 and Article II. 17.2. 11.24.1.4 Resuming payments In order to resume payments, the beneficiaries must endeavour to meet the notified conditions as soon as possible and must inform the Commission of any progress made. If the conditions for resuming payments are met the suspension will be lifted. The Commission will send a formal notification to the coordinator. 11.24.2 Suspension of the time limit for payments ĪI.24.2.1 The Commission may at any moment suspend the time limit for payment specified in Articles 1.5.2, 1.5.3 and 1.5.4 if a request for payment cannot be approved because: (a) it does not comply with the provisions of the Agreement, or (b) the appropriate supporting documents have not been produced, or (c) there is a doubt about the eligibility of the costs declared in the financial statements and additional checks, reviews, audits or investigations are necessary. 11.24.2.2 The Commission must send a formal notification to the coordinator informing it of: (a) the suspension and (b) the reasons for the suspension. The suspension takes effect on the day the formal notification is sent by the Commission. 11.24.2.3 If the conditions for suspending the payment deadline are no longer met, the suspension will be lifted and the remaining period will resume. If the suspension exceeds two months, the coordinator may request the Commission if the suspension will continue. If the payment deadline has been suspended due to the non-compliance of the technical reports or financial statements with the Agreement and the revised report or statement is not submitted or was submitted but is also rejected, the Commission may terminate the Agreement or the participation of the beneficiary in accordance with Article 11.17.3.1(c), and reduce the grant in accordance with Article II.25.4. ARTICLE 11.25 - CALCULATION OF THE FINAL AMOUNT OF THE GRANT The final amount of the grant depends on the actual extent to which the action is implemented in accordance with the Agreement. The final amount of the grant is calculated by the Commission at the time of payment of the balance in the following steps: 52 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 Step 1 - Application of the reimbursement rate to the eligible costs and addition of the unit, flat-rate of lump sum contributions Step 2 - Limit to the maximum amount of the grant Step 3 - Reduction due to the no-profit rule Step 4 - Reduction due to improper implementation or breach of other obligations 11.25.1 Step 1 - Application of the reimbursement rate to the eligible costs and addition of the unit, flat-rate of lump sum contributions This step is applied as follows: (a) If, in accordance with Article 1.3.2(a), the grant takes the form of the reimbursement of eligible costs, the reimbursement rate specified in that Article is applied to the eligible costs of the action approved by the Commission for the corresponding categories of costs, beneficiaries and affiliated entities; (b) If, in accordance with Article 1.3.2(b), the grant takes the form of a unit contribution, the unit contribution specified that Article is multiplied by the actual number of units approved by the Commission for the corresponding beneficiaries and affiliated entities; (c) If, in accordance with Article 1.3.2(c), the grant takes the form of a lump sum contribution, the lump sum specified in that Article for the corresponding beneficiaries and affiliated entities is applied, subject to the approval by the Commission of the proper implementation of the corresponding tasks or part of the action in accordance with Annex I; (d) If, in accordance with Article 1.3.2(d), the grant takes the form of a flat-rate contribution, the flat rate referred to in that Article is applied to the eligible costs or to the contribution approved by the Commission for the corresponding beneficiaries and affiliated entities. If Article 1.3.2 provides for a combination of different forms of grant, the amounts obtained must be added. 11.25.2 Step 2 - Limit to the maximum amount of the grant The total amount paid to the beneficiaries by the Commission may in no circumstances exceed the maximum amount of the grant. If the amount obtained following Step 1 is higher than this maximum amount, the final amount of the grant is limited to the latter. 11.25.3 Step 3 - Reduction due to the no-profit rule The grant may not produce a profit for the beneficiaries, unless specified otherwise in the Special Conditions. ‘Profit’ means the surplus of the amount obtained following Steps 1 and 2 plus the total receipts of the action, over the total eligible costs of the action. 53 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 The total eligible costs of the action are the consolidated total eligible costs approved by the Commission for the categories of costs reimbursed in accordance with Article 1.3.2(a). The total receipts of the action are the consolidated total receipts established, generated or confirmed on the date on which the request for payment of the balance is drawn up by the coordinator. The following are considered receipts: (a) income generated by the action·, (b) financial contributions given by third parties to a beneficiary or to an affiliated entity, if they are specifically assigned by the third parties to the financing of the eligible costs of the action reimbursed by the Commission in accordance with Article I.3.2(a)(i). The following are however not considered receipts: (a) financial contributions by third parties, if they may be used to cover costs other than the eligible costs under the Agreement; (b) financial contributions by third parties with no obligation to repay any amount unused at the end of the implementation period. If there is a profit, it will be deducted in proportion to the final rate of reimbursement of the actual eligible costs of the action approved by the Commission for the categories of costs referred to in Article I.3.2(a)(i) (as compared to the amount calculated following Steps 1 and 2). II.25.4 Step 4 - Reduction due to improper implementation or breach of other obligations The Commission may reduce the maximum amount of the grant if the action has not been implemented properly as described in Annex I (i.e. has not been implemented or has been implemented poorly, partially or late), or if another obligation under the Agreement has been breached. The amount of the reduction will be proportionate to the improper implementation of the action or to the seriousness of the breach. Before reduction of the grant, the Commission must send a formal notification to the coordinator: (a) informing it of: (i) its intention to reduce the maximum amount of the grant, (ii) the amount it intends to reduce (iii) the reasons for reduction; and (b) inviting it to submit observations within 30 calendar days of receiving the formal notification. 54 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 If the Commission does not receive any observations or decides to pursue reduction despite the observations it has received, it will send a formal notification informing the coordinator of its decision. If the grant is reduced, the Commission must calculate the reduced grant amount by deducting the amount of the reduction (calculated in proportion to the improper implementation of the action or to the seriousness of the breach of obligations) from the maximum amount of the grant. The final amount of the grant will be the lower of the following two: (a) the amount obtained following Steps 1 to 3 or (b) the reduced grant amount following Step 4. ARTICLE 11.26 - RECOVERY 11.26.1 Recovery at the time of payment of the balance Where the payment of the balance takes the form of a recovery, the coordinator must repay the Commission the amount in question, even if it has not been the final recipient of the amount due. II.26.2Recovery after payment of the balance Where an amount is to be recovered in accordance with Articles 11.27.6, II.27.7 and 11.27.8, the beneficiary concerned by the audit or OLAF findings must repay the Commission the amount in question. Where the audit findings do not concern a specific beneficiary (or its affiliated entities), the coordinator must repay the Commission the amount in question, even if it has not been the final recipient of the amount due. Each beneficiary is responsible for the repayment of any amount unduly paid by the Commission as a contribution towards the costs incurred by its affiliated entities. II.26.3 Recovery procedure Before recovery, the Commission must send a formal notification to the beneficiary concerned: (a) informing it of its intention to recover the amount unduly paid; (b) specifying the amount due and the reasons for recovery and (c) inviting the beneficiary to make any observations within a specified period. If no observations have been submitted or if, despite the observations submitted by the beneficiary, the Commission decides to pursue the recovery procedure, the Commission may confirm recovery by sending through а formal notification to the beneficiary a debit note, specifying the terms and the date for payment. If payment has not been made by the date specified in the debit note, the Commission will recover the amount due: 55 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 (a) by offsetting it, without the beneficiary’s prior consent, against any amounts owed to the beneficiary concerned by the Commission or an executive agency (from the Union or the European Atomic Energy Community (Euratom) budget) (‘offsetting’); In exceptional circumstances, to safeguard the financial interests of the Union, the Commission may offset before the due date. An action may be brought against such offsetting before the General Court of the European Union in accordance with Article 263 TFEU; (b) by drawing on the financial guarantee where provided for in accordance with Article 1.5.2 (‘drawing on the financial guarantee’); (c) by holding the beneficiaries jointly and severally liable up to the maximum EU contribution indicated, for each beneficiary, in the estimated budget (Annex III as last amended); (d) by taking legal action in accordance with Article II. 18.2 or with the Special Conditions or by adopting an enforceable decision in accordance with Article II. 18.3. II.26.4Interest on late payment If payment is not made by the date in the debit note, the amount to be recovered will be increased by late-payment interest at the rate set out in Article 1.5.5 from the day following the date for payment in the debit note up to and including the date the Commission receives full payment of the amount. Partial payments must first be credited against charges and late-payment interest and then against the principal. II.26.5Bank charges Bank charges incurred in the recovery process must be borne by the beneficiary concerned, unless Directive 2007/64/EC7 applies. ARTICLE 11.27 - CHECKS, AUDITS AND EVALUATION II.27.1 Technical and financial checks, audits, interim and final evaluations The Commission may, during the implementation of the action or afterwards, carry out technical and financial checks and audits in relation to the proper implementation of the action and compliance with the obligations under the Agreement. It may also check the statutory records of the beneficiaries for the purpose of periodic assessments of lump sum, unit cost or flat-rate amounts. Information and documents provided in the framework of checks or audits must be treated on a confidential basis. 7 Directive 2007/64/EC7 of the European Parliament and of the Council of 13 November 2007 on payment services in the internal market amending Directives 97/7/EC, 2002/65/EC, 2005/60/EC and 2006/48/EC and repealing Directive 97/5/EC 56 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 In addition, the Commission may carry out interim or final evaluation of the impact of the action measured against the objective of the Union programme concerned. Checks, audits or evaluations made by the Commission may be carried out either directly by its own staff or by any other outside body authorised to do so on its behalf. Such checks, audits or evaluations may be initiated during the implementation of the Agreement and for a period of five years starting from the date of payment of the balance. This period is limited to three years if the maximum amount of the grant is not more than EUR 60 000. The check, audit or evaluation procedures are considered to be initiated on the date of receipt of the letter of the Commission announcing it. If the audit is carried out on an affiliated entity, the beneficiary concerned must inform the affiliated entity. 11.27.2 Duty to keep documents The beneficiaries must keep all original documents, especially accounting and tax records, stored on any appropriate medium, including digitalised originals when they are authorised by their respective national law and under the conditions laid down therein, for a period of five years starting from the date of payment of the balance. This period is limited to three years if the maximum amount of the grant is not more than EUR 60 000. The periods set out in the first and second subparagraphs are longer if there are on-going audits, appeals, litigation or pursuit of claims concerning the grant, including in the case referred to in Article 11.27.7. In such cases, the beneficiaries must keep the documents until such audits, appeals, litigation or pursuits of claims are closed. 11.27.3 Obligation to provide information Where a check, audit or evaluation is initiated before the payment of the balance, the coordinator must provide any information, including information in electronic format, requested by the Commission or by any other outside body authorised by it. Where appropriate, the Commission may request such information to be provided directly by a beneficiary. Where a check or audit is initiated after payment of the balance, such information must be provided by the beneficiary concerned. In case the beneficiary concerned does not comply with the obligations set out in the first and second subparagraphs, the Commission may consider: (a) any cost insufficiently substantiated by information provided by the beneficiary as ineligible; (b) any unit, lump sum or flat-rate contribution insufficiently substantiated by information provided by the beneficiary as undue. 57 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 II.27.40n-the-spot visits During an on-the-spot visit, the beneficiaries must allow Commission staff and outside personnel authorised by the Commission to have access to the sites and premises where the action is or was carried out, and to all the necessary information, including information in electronic format. They must ensure that the information is readily available at the moment of the on-the-spot visit and that information requested is handed over in an appropriate form. In case the beneficiary concerned refuses to provide access to the sites, premises and information in accordance with the first and second subparagraphs, the Commission may consider: (a) any cost insufficiently substantiated by information provided by the beneficiary as ineligible; (b)any unit, lump sum or flat-rate contribution insufficiently substantiated by information provided by the beneficiary as undue. 11.27.5 Contradictory audit procedure On the basis of the findings made during the audit, a provisional report (‘draft audit report’) must be drawn up. It must be sent by the Commission or its authorised representative to the beneficiary concerned, which must have 30 calendar days from the date of receipt to submit observations. The final report (‘final audit report’) must be sent to the beneficiary concerned within 60 calendar days of expiry of the time limit for submission of observations. 11.27.6 Effects of audit findings On the basis of the final audit findings, the Commission may take the measures which it considers necessary, including recovery at the time of payment of the balance or after payment of the balance of all or part of the payments made by it, in accordance with Article 11.26. In the case of final audit findings made after the payment of the balance, the amount to be recovered corresponds to the difference between the revised final amount of the grant, determined in accordance with Article 11.25, and the total amount paid to the beneficiaries under the Agreement for the implementation of the action. 11.27.7 Correction of systemic or recurrent errors, irregularities, fraud or breach of obligations II.27.7.1 The Commission may extend audit findings from other grants to this grant if: (a) the beneficiary concerned is found, in other EU or Euratom grants awarded under similar conditions, to have committed systemic or recurrent errors, irregularities, fraud or breach of obligations that have a material impact on this grant and (b) the final audit findings are sent to the beneficiary concerned through a formal notification, together with the list of grants affected by the findings within the period referred to in Article 11.27.1 58 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 The extension of findings may lead to: (a) the rejection of costs as ineligible, (b) reduction of the grant in accordance with Article 11.25.4, (c) recovery of undue amounts in accordance with Article 11.26, (d) suspension of payments in accordance with Article 11.24.1 (e) suspension of the action implementation in accordance with Article II. 16.2, (f) termination in accordance with Article II. 17.3. II.27.7.2 The Commission must send a formal notification to the beneficiary concerned informing it of the systemic or recurrent errors and of its intention to extend the audit findings, together with the list of grants affected. (a) If the findings concern eligibility of costs the procedure is as follows: Step 1 - The formal notification must include: (i) an invitation to submit observations on the list of grants affected by the findings; (ii) a request to submit revised financial statements for all grants affected; (iii)where possible, the correction rate for extrapolation established by the Commission to calculate the amounts to be rejected on the basis of the systemic or recurrent errors, irregularities, fraud or breach of obligations, if the beneficiary concerned: - would consider that the submission of revised financial statements is not possible or practicable or - would not submit revised financial statements. Step 2 - The beneficiary concerned has 60 calendar days from receiving the formal notification to submit observations and revised financial statements or to propose a duly substantiated alternative correction method. This period may be extended by the Commission in justified cases. Step 3 - If the beneficiary concerned submits revised financial statements taking account of the findings the Commission will define the amount to be corrected on the basis of those revised statements. If the beneficiary proposes an alternative correction method and the Commission accepts it, the Commission must send a formal notification to the beneficiary concerned informing it of: (i) the acceptability of the alternative method and (ii) the revised eligible costs determined by applying this method. Otherwise the Commission must send a formal notification to the beneficiary concerned informing it of: (i) the non-acceptability of the observations or the alternative method proposed and (ii) the revised eligible costs determined by applying the extrapolation method initially notified to the beneficiary. 59 Agreement number: ECHO/SUB/2016/739964/PREP 14 Multi beneficiaries model agreement: 2016 If the systemic or recurrent errors, irregularities, fraud or breach of obligations are found after the payment of the balance, the amount to be recovered corresponds to the difference between: (i) the revised final amount of the grant, determined in accordance with Article 11.25 on the basis of the revised eligible costs declared by the beneficiary and approved by the Commission or on the basis of the revised eligible costs after extrapolation, and (ii) the total amount paid to the beneficiaries under the Agreement for the implementation of the action·, (b) If the findings concern improper implementation or a breach of another obligation the procedure is as follows: Step 1 - The formal notification must include: (i) an invitation to submit observations on the list of grants affected by the findings and (ii) the correction flat-rate the Commission intends to apply to the maximum amount of the grant or to part of it according to the principle of proportionality. Step 2 - The beneficiary concerned has 60 calendar days from receiving the formal notification to submit observations or to propose a duly substantiated alternative flat-rate. Step 3 - If the Commission accepts the alternative flat rate proposed by the beneficiary, it must send a formal notification to the beneficiary concerned informing it of: (i) the acceptability of the alternative flat-rate and (ii) the corrected grant amount by applying this flat rate. Otherwise the Commission must send a formal notification to the beneficiary concerned informing it of: (i) the non-acceptability of the observations or the alternative flat rate proposed and (ii) the corrected grant amount by applying the flat rate initially notified to the beneficiary. If the systemic or recurrent errors, irregularities, fraud or breach of obligations are found after the payment of the balance, the amount to be recovered corresponds to the difference between: (i) the revised final amount of the grant after flat-rate correction and (ii) the total amount paid to the beneficiaries under the Agreement for the implementation of the action. II.27.8 Checks and inspections by OLAF The European Anti-Fraud Office (OLAF) has the same rights as the Commission, notably right of access, for the purpose of checks and investigations. 60 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 By virtue of Council Regulation No 2185/968 and Regulation No 883/20139 OLAF may also carry out on-the-spot checks and inspections in accordance with the procedures laid down by Union law for the protection of the financial interests of the Union against fraud and other irregularities. Where appropriate, OLAF findings may lead to recovery by the Commission. Moreover, findings arising from an OLAF investigation may lead to criminal prosecutions under national law. II.27.9 Checks and audits by the European Court of Auditors The European Court of Auditors has the same rights as the Commission, notably right of access, for the purpose of checks and audits. 8 Council Regulation (Euratom, EC) No 2185/96 of 11 November 1996 concerning on-the-spot checks and inspections carried out by the Commission in order to protect the European Communities’ financial interests against fraud and other irregularities 9 Regulation (EU, Euratom) No 883/2013 of the European Parliament and of the Council of 11 September 2013 concerning investigations conducted by the European Anti-Fraud Office (OLAF), 61 Agreement number: ECHO/SUB/2016/739964/PREP14 Multi beneficiaries model agreement: 2016 ANNEX IV MANDATE10 11 I, the undersigned, [forename and surname of the legal representative of the future beneficiary signing this mandate], representing, [full official name of the future beneficiary] [ACRONYM] [official legal status orform]n [official registration No}12 [full official address] [VAT number], (‘the beneficiary’), (‘the action’) hereby: 1. Mandate [full official name of the coordinator] [ACRONYM] [official legal status orform] [official registration No]13 [full official address] 10 One original singed version of this Annex to be included for each beneficiary. (Not for the coordinator). 11 To be deleted or filled in according to the "Legal Entity" form 12 To be deleted or filled in according to the "Legal Entity" form 13 To be deleted or filled in according to the "Legal Entity" form 62 European Commission DIRECTORATE-GENERAL HUMANITARIAN AID AND CIVIL PROTECTION - ECHO Grant application forms 63 FORM FO mm BUDGET OF THE ACTION % of eligible Part A: Eligible cost categories Rate % € Part B: Financing Plan € costs Personnel 625.838 Requested EC contribution 784.406 75,00% Travel and subsistence Contribution of the Coordinator 263.680 24.501 2,34% Equipment Contribution of the Beneficiary (ies) 3.350 236.968 22,66% Sub-contracting / External assistance 37.700 Other sources of funding 0 0,00% Other direct costs 94.800 Expected direct revenues 0 0,00% Indirect costs / overheads 2,00% 20.507 TOTAL ELIGIBLE COSTS 1.045.875 TOTAL 1.045.875 For information only "In kind" contributions / costs not included in the 18.175 budget____________________________ Project Funding Breakdown Form F1 ЯИИВ шшншш Coordinator's contribution Coordinator n° Coordinator short name Total costs of the Coordinator's own Amount of EC actions in € contribution in € contribution requested in € CO ICPD 98.003 24.501 73.502 Beneficiaries' contribution Assicated Beneficiary short name Total costs of the Amount of EC Beneficiary n° actions in € contribution in € contribution requested in € BE1 MoH-BE 269.850 67.463 202.388 BE2 DEMA 81.798 20.449 61.348 BE3 EHB 131.417 32.854 98.562 BE4 DGSCGC 94.858 23.714 71.143 BE5 JUH 155.482 38.870 116.611 BE6 ULEI 79.247 19.812 59.435 BE7 Mol-RO 68.565 17.141 51.424 BE8 ASSR 66.655 16.664 49.991 I TOTAL 236.968 710.904 í Co-financers contribution Amount of co- Co-financer name TOTAL 0 Expected direct reveiTues Description of direct revenue Amount 0 65 FormF2 «rtitÉiS esilili ."’Ä; . . . .. Personnel Λ 1) D E F G = E/F H I=Ü*H j I Coordinator / Annual gross salary Annual number Number of Type of Reference to Beneficiary Category or Name of person Function in the project plus obligatory social of working Daily rate working days contract Total Costs € Task ID/ reference assigned to the charges days Action project ICPD Luigi D'Angelo Permanent Project director 129.060 220 587 20 11.733 5 staff ICPD Paolo Vaccari Permanent Lead Steering Committee & Task 5 Project Management 220 196 60 11.775 5 43.175 staff ICPD Federico Federighi Permanent Member of Steering Committee 16.554 91.046 220 414 40 5 staff ASSR Renata Penazzi Permanent 13.093 225 58 185 10.765 3 staff ASSR Marcel Sedlačko Permanent 225 85 145 12.373 3 19.200 staff DEMA Nicolai Rauhe Kristinsen Permanent Lead Task 2: Logistics 210 348 31 10.799 2 73.152 staff DEMA Carsten Bamberg Permanent 72.217 210 344 18 6.190 2 staff DEMA Jan Gert Olsen Permanent 67.854 210 323 12 3.877 2 staff DEMA Morten Helge Hansen Permanent 84.559 210 403 29 11.677 2 staff DEMA Tais Krøger Ziethen Permanent 54.470 210 259 3 778 2 staff DEMA Thorbjørn Nesjan Permanent 75.814 210 361 5 1.805 2 staff DEMA Wasim Zafar Permanent 65.626 2101 313 9 2.813 2 staff DGSCGC Frédéric Monard Permanent 84.000 210 400 40 16.0001 1 staff DGSCGC Patrick Grignon Permanent Lead Task 1 : Governance 120.000 210 571 30 17.143 1 staff SDIS 30 Isabelle Arnaud Permanent 80.000 210 381 30 11.429 1 staff DGSCGC Christian Baroux Permanent 60.000 210 286 30 8.571 1 staff Form F2 A B f D E F G = EfF H l = G*H j Coordinator / Annual gross salary Annual number Number of Type of working days Reference to Beneficiary Category or Name of person Function in the project plus obligatory social of working Daily rate Total Costs € Task ID/ reference contract assigned to the charges days Action project EHB Raido Paasma Permanent Lead Task 3: Healthcare staff 68.567 210 327 48 15.672 3 EHB Üllar Kaljume Permanent 46.119 210 220 20 4.392 3 staff EHB Andrus Remmelgas Permanent staff 103.556 210 493 15 7.397 3 EHB Arkadi Popov Permanent staff 105.943 210 504 23 11.603 3 EHB Viliem Nigu Permanent 47.485 210 226 23 5.201 3 staff EHB Alo Rull Permanent 59.448 210 283 23 6.511 3 staff EHB Ülle Uustalu Permanent 52.673 210 251 15 3.762 3 staff EHB Mait Altmets Permanent σ> -«j staff 58.600 210 279 15 4.186 3 EHB Andras Laugamets Permanent 58.664 210 279 25 6.984 3 staff EHB Reno Rattasepp Permanent 22.636 210 108 25 2.695 3 staff EHB Ujana Satalov Permanent 46.006 210 219 15 3.286 3 staff EHB Perit Puust Permanent 22.398 210 107 15 1.600 3 staff EHB Rein Vaheoja Permanent 34.113 210 162 10 1.624 3 staff EHB Kaisa Soondra Permanent 43.106 210 205 23 4.721 3 staff JUH Harm Bastian Harms Permanent Task 5 Project Management 97.308 209 466 58 27.004 5 staff JUH Gerhard Jäkel Permanent Assistant Project Manager 29.426 58.852 210 280 105 5 staff JUH Mathias Sitterlee Permanent Manager Budget and Finance 58.852 210 280 105 29.426 5 staff JUH tbd Permanent Logistics; Staff, Training and Exercise 9 3.214 5 75.000 210 357 staff JUH Oliver Rodewald Permanent Governance 3.643 5 85.000 210 405 9 staff FormF2 Piillä Personnel Λ II C I) i-: F G=E/F j I-G'π Coordinator / Annual gross salary Annual number Number of Type of Reference to Beneficiary Category or Name of person Function in the project plus obligatory social of working Daily rate working days contract Total Costs € Task ID ƒ reference charges days assigned to the Action project Mol-RO Christian Marius Boeriu Permanent 29.313 220 133 18 2.398 4 staff Mol-RO Hadrian Borcea Permanent 31.033 220 141 25 3.526 I 4 staff Mol-RO Paul - Bogdan Csillag Permanent 27.305 220 124 18 2.234 4 staff Mol-RO Alexandru Bogdan Dinu Permanent 26.585 220 121 20 2.417 4 staff Mol-RO Adina Maria Drahiciu Permanent 10.499 220 48 12 573 4 staff Mol-RO Melinda Gal Permanent 14 23.919 220 109 1.522 4 staff Mol-RO lon Cosmin Muntean Permanent 4 32.985 220 150 20 2.999 staff Mol-RO Allna - Diana Muresan Permanent 13.764 220 14 876 4 63 staff Mol-RO lonut Olaru-Barbilian Permanent 24.863 220 20 2.260 4 113 staff Mol-RO Alina Petriča Permanent Lead Task 4: Staff, Training and Exercise 30 3.040 4 22.293 220 101 staff Mol-RO Bogdan Solomon Permanent 26.617 220 121 20 2.420 4 staff Mol-RO Emilia Tu ruez Permanent 18.345 220 18 1.501 4 83 staff MoH-BE Tim Das Permanent Lead Task 5 Project Management 81.918 210 390 420 163.836 5 staff MoH-BE Paul Pardon Permanent 66.524 210 317 6 1.901 5 staff MoH-BE Erika Vlieghe Permanent 66.524 210 317 6 1.901 5 staff MoH-BE Gino Claes Permanent 53.978 210| 257 26 6.683 5 staff MoH-BE Geert Gijs Permanent Task 5 Project Management 50.223 210 239 120 28.699 5 staff ULEI Thomas Neumuth Permanent IT Assistance for medical treatment and digital common 93.600' 210 446 158 70.423 staff patient record 1 . - TOTAL 625.838 Form F3 ^' A c D F=D’E: G H=D"G l=F+H J Coordinator / Number of Reference to Beneficiary Travel unit Subsistence Subsistence Journey from - to Reasons for travel people Travel costs Total costs € Task ID 1 reference costs unit costs costs travelling Action ICPD Rome EUMFH Kick-Off meeting 3 0,00 € 0 100,00 € 300 300 5 Rome-Brussels Kick-Off meeting with DG ECHO 1 500,00 € 500 100,00 € 100 600 5 Rome-Antwerp EUMFH Stakeholder workshop 4 500,00 € 2.000 295,00 € 1.180 3.180 5 Rome-Paris Workshop 1 on governance 2 500,00 € 1.000 200,00 € 400 1.400 1 Rome-Paris Workshop 2 on governance 2 500,00 € 1.000 200,00 € 400 1.400 1 Rome-Tallinn Workshop 1 on healthcare 2 500,00 € 1.000 200,00 € 400 1.400 3 Rome-Berlin EUMFH Steering committee 3 500,00 € 1.500 200,00 € 600 2.100 5 Rome-Tallinn Workshop 2 on healthcare 2 500,00 € 1.000 200,00 € 400 1.400 3 Rome-(Denmark) Workshop on logistics 2 500,00 € 1.000 475,00 € 950 1.950 2 Rome-Bratislava EUMFH Steering committee 3 500,00 € 1.500 200,00 € 600 2.100 5 Rome-Timisoara Workshop 1 on training 2 500,00 € 1.000 200,00 € 400 1.400 4 Rome-Targu Mures Workshop 2 on training 2 500,00 € 1.000 200,00 € 400 1.400 4 Rome-Antwerp EUMFH training 1 5 500,00 € 2.500 600,00 € 3.000 5.500 4 Rome-Antwerp EUMFH training 2 5 500,00 € 2.500 600,00 € 3.000 5.500 4 Rome-Leipzig EUMFH Steering committee 3 500,00 € 1.500 200,00 € 600 2.100 5 tba EUMFH Exercise 8 500,00 € 4.000 310,00 € 2.480 6.480 4 Rome EUMFH Steering committee 3 0,00 € 0 200,00 € 600 600 5 Rome-Geneva HNPW 1 500,00 € 500 1.000,00 € 1.000 1.500 5 Rome-Brussels Civil protection Forum 1 500,00 € 500 400,00 € 400 900 5 tba Ad-hoc meeting 1 1 500,00 € 500 160,00 € 160 660 5 tba Ad-hoc meeting 2 1 500,00 € 500 160,00 € 160 660 5 Form F3 A B c D E F=D*E G H=D'G l=F+H j Coordinator / Number of Reference to Travel unit Subsistence Subsistence Beneficiary Journey from - to Reasons for travel people Travel costs Total costs € Task ID / costs unit costs costs reference travelling Action ASSR Stará Lubovna-Rome EUMFH Kick-Off meeting 1 400,00 € 400 200,00 € 200 600 5 Stará Lubovna-Antwerp EUMFH Stakeholder workshop 2 400,00 € 800 295,00 € 590 1.390 5 Stará Lubovna-Paris Workshop 1 on governance 2 400,00 € 800 200,00 € 400 1.200 1 Stará Lubovna-Paris Workshop 2 on governance 2 400,00 € 800 200,00 € 400 1.200 1 Stará Lubovna-Tallinn Workshop 1 on healthcare 2 400,00 € 800 200,00 € 400 1.200 3 Stará Lubovna-Berlin EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5 Stará Lubovna-Tallinn Workshop 2 on healthcare 2 400,00 € 800 200,00 € 400 1.200 3 Stará Lubovna-(Denmark) Workshop on logistics 2 400,00 € 800 475,00 € 950 1.750 2 Stará Lubovna-Bratislava EUMFH Steering committee 1 150,00 € 150 200,00 € 200 350 5 Stará Lubovna-Timisoara Workshop 1 on training 2 500,00 € 1.000 200,00 € 400 1.400 4 Stará Lubovna-Targu Mures Workshop 2 on training 2 500,00 € 1.000 200,00 € 400 1.400 4 Stará Lubovna-Antwerp EUMFH training 1 5 400,00 € 2.000 600,00 € 3.000 5.000 4 Stará Lubovna-Antwerp EUMFH training 2 5 400,00 € 2.000 600,00 € 3.000 5.000 4 Stará Lubovna-Leipzig EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5 tba EUMFH Exercise 8 400,00 € 3.200 310,00 € 2.480 5.680 4 Stará Lubovna-Rome EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5 Form F3 A B c D E F=D*E G H=D*G l=F+H J Coordinator / Number of Reference to Beneficiary Travel unit Subsistence Subsistence Journey from - to Reasons for travel people Travel costs Total costs € Task ID / reference costs unit costs costs travelling Action DEMA Kopenhagen-Rome EUMFH Kick-Off meeting 1 350,00 € 350 200,00 € 200 550 5 Kopenhagen-Antwerp EUMFH Stakeholder workshop 3 350,00 € 1.050 295,00 € 885 1.935 5 Kopenhagen-Paris Workshop 1 on governance 2 350,00 € 700 200,00 € 400 1.100 1 Kopenhagen-Paris Workshop 2 on governance 2 350,00 € 700 200,00 € 400 1.100 1 Kopenhagen-Tallinn Workshop 1 on healthcare 2 550,00 € 1.100 200,00 € 400 1.500 3 Kopenhagen-Berlin EUMFH Steering committee 1 350,00 € 350 200,00 € 200 550 5 Kopenhagen-Tallinn Workshop 2 on healthcare 2 550,00 € 1.100 200,00 € 400 1.500 3 (Denmark) Workshop on logistics 2 0,00 € 0 475,00 € 950 950 2 Kopenhagen-Bratislava EUMFH Steering committee 1 550,00 € 550 200,00 € 200 750 5 Kopenhagen-Timisoara Workshop 1 on training 2 550,00 € 1.100 200,00 € 400 1.500 4 Kopenhagen-Targu Mures Workshop 2 on training 2 550,00 € 1.100 200,00 € 400 1.500 4 Kopenhagen-Antwerp EUMFH training 1 5 350,00 € 1.750 600,00 € 3.000 4.750 4 Kopenhagen-Antwerp EUMFH training 2 5 350,00 € 1.750 600,00 € 3.000 4.750 4 Kopenhagen-Leipzig EUMFH Steering committee 1 350,00 € 350 200,00 € 200 550 5 tba EUMFH Exercise 8 400,00 € 3.200 310,00 € 2.480 5.680 4 Kopenhagen-Rome EUMFH Steering committee 1 350,00 € 350 200,00 € 200 550 5 Form F3 A B .... 1111 1 J c D E F=D"E G H=D"G l=F+H Coordinator/ Number of Reference to Travel unit Subsistence Subsistence Beneficiary Journey from - to Reasons for travel people Travel costs Total costs € Task ID / costs unit costs costs reference travelling Action DGSCGC Paris-Rome EUMFH Kick-Off meeting 1 300,00 € 300 200,00 € 200 500 5 Paris-Antwerp EUMFH Stakeholder workshop 3 400,00 € 1.200 295,00 € 885 2.085 5 Paris Workshop 1 on governance 2 0,00 € 0 200,00 € 400 400 1 Paris Workshop 2 on governance 2 0,00 € 0 200,00 € 400 400 1 Paris-Tallinn Workshop 1 on healthcare 2 500,00 € 1.000 200,00 € 400 1.400 3 Paris-Berlin EUMFH Steering committee 1 300,00 € 300 200,00 € 200 500 5 Paris-Tallinn Workshop 2 on healthcare 2 500,00 € 1.000 200,00 € 400 1.400 3 Paris-(Denmark) Workshop on logistics 2 250,00 € 500 475,00 € 950 1.450 2 Paris-Bratislava EUMFH Steering committee 1 250,00 € 250 200,00 € 200 450 5 Paris-Timisoara Workshop 1 on training 2 800,00 € 1.600 200,00 € 400 2.000 4 Paris-Targu Mures Workshop 2 on training 2 550,00 € 1.100 200,00 € 400 1.500 4 Paris-Antwerp EUMFH training 1 5 250,00 € 1.250 600,00 € 3.000 4.250 4 Paris-Antwerp EUMFH training 2 5 250,00 € 1.250 600,00 € 3.000 4.250 4 Paris-Leipzig EUMFH Steering committee 1 250,00 € 250 200,00 € 200 450 5 tba EUMFH Exercise 8 350,00 € 2.800 310,00 € 2.480 5.280 4 Paris-Rome EUMFH Steering committee 1 300,00 € 300 200,00 € 200 500 5 Form F3 A B c D E F=D*F G H=D*G l=F+H J Coordinator / Number of Reference to Beneficiary Travel unit Subsistence Subsistence Journey from - to Reasons for travel people Travel costs Total costs € Task ID / costs unit costs costs reference travelling Action EHB Tallinn-Rome EUMFH Kick-Off meeting 1 480,00 € 480 200,00 € 200 680 5 Tallinn-Antwerp EUMFH Stakeholder workshop 3 550,00 € 1.650 295,00 € 885 2.535 5 Tallinn-Paris Workshop 1 on governance 2 480,00 € 960 200,00 € 400 1.360 1 Tallinn-Paris Workshop 2 on governance 2 480,00 € 960 200,00 € 400 1.360 1 Tallinn Workshop 1 on healthcare 2 0,00 € 0 200,00 € 400 400 3 Tallinn-Berlin EUMFH Steering committee 1 480,00 € 480 200,00 € 200 680 5 Tallinn Workshop 2 on healthcare 2 0,00 € 0 200,00 € 400 400 3 Tallinn-(Denmark) Workshop on logistics 2 480,00 € 960 475,00 € 950 1.910 2 Tallinn-Bratislava EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5 Tallinn-Timisoara Workshop 1 on training 2 500,00 € 1.000 200,00 € 400 1.400 4 Tallinn-Targu Mures Workshop 2 on training 2 500,00 € 1.000 200,00 € 400 1.400 4 Tallinn-Antwerp EUMFH training 1 5 500,00 € 2.500 600,00 € 3.000 5.500 4 Tallinn-Antwerp EUMFH training 2 5 500,00 € 2.500 600,00 € 3.000 5.500 4 Tallinn-Leipzig EUMFH Steering committee 1 480,00 € 480 200,00 € 200 680 5 tba EUMFH Exercise 8 500,00 € 4.000 310,00 € 2.480 6.480 4 Tallinn-Rome EUMFH Steering committee 1 480,00 € 480 200,00 € 200 680 5 Form F3 A B D E F=D*E 3 H=D'G l=F+H J Coordinator / Number of Reference to Travel unit Subsistence Subsistence Beneficiary Journey from - to Reasons for travel people Travel costs Total costs € Task ID / costs unit costs costs reference travelling Action JUH Hamburg-Rome EUMFH Kick-Off meeting 3 400,00 € 1.200 200,00 € 600 1.800 5 Hamburg-Brussels Kick-Off meeting with DG ECHO 1 500,00 € 500 100,00 € 100 600 5 Hamburg-Antwerp EUMFH Stakeholder workshop 4 500,00 € 2.000 295,00 € 1.180 3.180 5 Hamburg-Paris Workshop 1 on governance 2 400,00 € 800 200,00 € 400 1.200 1 Hamburg-Paris Workshop 2 on governance 2 400,00 € 800 200,00 € 400 1.200 1 Hamburg-Tallinn Workshop 1 on healthcare 2 550,00 € 1.100 200,00 € 400 1.500 3 Hamburg-Berlin EUMFH Steering committee 3 150,00 € 450 200,00 € 600 1.050 5 Hamburg-Tallinn Workshop 2 on healthcare 2 550,00 € 1.100 200,00 € 400 1.500 3 "sj ■ŕ» Berlin-(Denmark) Workshop on logistics 2 350,00 € 700 475,00 € 950 1.650 2 Hamburg-Bratislava EUMFH Steering committee 3 450,00 € 1.350 200,00 € 600 1.950 5 Hamburg-Timisoara Workshop 1 on training 2 550,00 € 1.100 200,00 € 400 1.500 4 Hamburg-Targu Mures Workshop 2 on training 2 550,00 € 1.100 200,00 € 400 1.500 4 Berlin-Antwerp EUMFH training 1 5 500,00 € 2.500 600,00 € 3.000 5.500 4 Berlin-Antwerp EUMFH training 2 5 500,00 € 2.500 600,00 € 3.000 5.500 4 Hamburg-Leipzig EUMFH Steering committee 3 100,00 € 300 200,00 € 600 900 5 tba EUMFH Exercise 8 500,00 € 4.000 310,00 € 2.480 6.480 4 Hamburg-Rome EUMFH Steering committee 3 400,00 € 1.200 200,00 € 600 1.800 5 Hamburg-Brussels Civil protection Forum 1 500,00 € 500 400,00 € 400 900 5 tba Ad-hoc meeting 1 1 400,00 € 400 160,00 € 160 560 5 tba Ad-hoc meeting 2 1 400,00 € 400 160,00 € 160 560 5 Hamburg-Brussels UCPM Modules Working Group 2 500,00 € 1.000 100,00 € 200 1.200 5 A B D E "" 11 j c F=D'E G H=C*G l=F+H Coordinator/ Number of Reference to Beneficiary Travel unit Subsistence Subsistence Journey from - to Reasons for travel people Travei costs Total costs € Task ID / reference costs unit costs costs travelling Action Mol-RO Bukarest-Rome EUMFH Kick-Off meeting 1 400,00 € 400 200,00 € 200 600 5 Bukarest-Antwerp EUMFH Stakeholder workshop 3 400,00 € 1.200 295,00 € 885 2.085 5 Bukarest-Paris Workshop 1 on governance 2 400,00 € 800 200,00 € 400 1.200 1 Bukarest-Paris Workshop 2 on governance 2 400,00 € 800 200,00 € 400 1.200 1 Bukarest-Tallinn Workshop 1 on healthcare 2 450,00 € 900 200,00 € 400 1.300 3 Bukarest-Berlin EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5 Bukarest-Tallinn Workshop 2 on healthcare 2 450,00 € 900 200,00 € 400 1.300 3 Bukarest-(Denmark) Workshop on logistics 2 450,00 € 900 475,00 € 950 1.850 2 Bukarest-Bratislava EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5 Timisoara Workshop 1 on training 2 0,00 € 0 200,00 € 400 400 4 Targu Mures Workshop 2 on training 2 0,00 € 0 200,00 € 400 400 4 Bukarest-Antwerp EUMFH training 1 5 400,00 € 2.000 600,00 € 3.000 5.000 4 Bukarest-Antwerp EUMFH training 2 5 400,00 € 2.000 600,00 € 3.000 5.000 4 Bukarest-Leipzig EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5 tba EUMFH Exercise 8 400,00 € 3.200 310,00 € 2.480 5.680 4 Bukarest-Rome EUMFH Steering committee 1 400,00 € 400 200,00 € 200 600 5 5 Form F3 A B c D E F=D"EE G H=D-G l=F+H , J Coordinator / Number of Reference to Travel unit Subsistence Subsistence Beneficiary Journey from - to Reasons for travel people Travel costs Total costs € Task ID / reference costs unit costs costs travelling Action MoH-BE Brussels-Rome EUMFH Kick-Off meeting 3 190,00 € 570 200,00 € 600 1.170 5 Brussels Kick-Off meeting with DG ECHO 1 0,00 € 0 100,00 € 100 100 5 Brussels-Antwerp EUMFH Stakeholder workshop 4 0,00 € 0 295,00 € 1.180 1.180 5 Brussels-Paris Workshop 1 on governance 2 280,00 € 560 200,00 € 400 960 1 Brussels-Paris Workshop 2 on governance 2 280,00 € 560 200,00 € 400 960 1 Brussels-Tallinn Workshop 1 on healthcare 2 380,00 € 760 200,00 € 400 1.160 3 Brussels-Berlin EUMFH Steering committee 3 180,00 € 540 200,00 € 600 1.140 5 Brussels-Tallinn Workshop 2 on healthcare 2 380,00 € 760 200,00 € 400 1.160 3 Brussels-(Denmark) Workshop on logistics 2 180,00 € 360 475,00 € 950 1.310 2 Brussels-Bratislava EUMFH Steering committee 3 90,00 € 270 200,00 € 600 870 5 Brussels-Timisoara Workshop 1 on training 2 330,00 € 660 200,00 € 400 1.060 4 Brussels-Targu Mures Workshop 2 on training 2 330,00 € 660 200,00 € 400 1.060 4 Brussels-Antwerp EUMFH training 1 5 0,00 € 0 600,00 € 3.000 3.000 4 Brussels-Antwerp EUMFH training 2 5 0,00 € 0 600,00 € 3.000 3.000 4 Brussels-Leipzig EUMFH Steering committee 3 150,00 € 450 200,00 € 600 1.050 5 tba EUMFH Exercise 8 350,00 € 2.800 310,00 € 2.480 5.280 4 Brussels-Rome EUMFH Steering committee 3 190,00 € 570 200,00 € 600 1.170 5 Brussels-Geneva HNPW 1 200,00 € 200 1.000,00 € 1.000 1.200 5 Brussels Civil protection Forum 1 0,00 € 0 100,00 € 100 100 5 tba Ad-hoc meeting 1 1 350,00 € 350 160,00 € 160 510 5 tba Ad-hoc meeting 2 1 350,00 € 350 160,00 € 160 510 5 Form F3 ro C D E F=D*E G H=D*G l=F+H j Coordinator / Number of Reference to Travel unit Subsistence Subsistence Beneficiary Journey from - to Reasons for travel people Travel costs Total costs € Task ID / costs unit costs costs reference travelling Action ULEI Leipzig-Rome EUMFH Kick-Off meeting 1 400,00 € 400 200,00 € 200 600 5 Leipzig-Antwerp EUMFH Stakeholder workshop 1 500,00 € 500 295,00 € 295 795 5 Leipzig-Tallinn Workshop 1 on healthcare 1 450,00 € 450 200,00 € 200 650 3 Leipzig-Berlin EUMFH Steering committee 1 110,00 € 110 200,00 € 200 310 5 Leipzig-Tallinn Workshop 2 on healthcare 1 450,00 € 450 200,00 € 200 650 3 Leipzig-(Denmark) Workshop on logistics 1 350,00 € 350 475,00 € 475 825 2 Leipzig-Bratislava EUMFH Steering committee 1 450,00 € 450 200,00 € 200 650 5 Leipzig EUMFH Steering committee 1 0,00 € 0 200,00 € 200 200 5 tba EUMFH Exercise 1 400,00 € 400 310,00 € 310 710 4 Leipzig-Rome EUMFH Steerinq committee 1 400,00 € 400 200,00 € 200 600 5 ' TOTAL 263.680 Form F4 A B C ■· D E F-D* E G Coordinator / Reference to Purchase Eligible Beneficiary Supplier/ Procedure Description Rate % Task ID / cost Costs € reference Action ICPD Tbd - through market Tablet for electronic patient record 450 100,00% 450 4 research (required quality with the best price) JUH Tbd - through market Tablet for electronic patient record 450 100,00% 450 4 research (required quality with the best price) MoH-BE Tbd - through market Tablet for electronic patient record 450 100,00% 450 4 research (required quality with the best price) MoH-BE Tbd - through market Notebook and printer 2.000 100,00% 2.000 5 research (required quality with the best price) ' TOTAL 3.350 79 Form F5 тштж шшшшш ’ Subcontracting/Externai assistance _____________________ Λ ________________________________________________________^ в C D E Coordinator / Reference to Beneficiary Provider/procedure Description of service subcontracted Total cost € Task ID / reference Action ICPD Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) 1.250 4 ICPD Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) 1.250 4 ASSR Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) 1.250 4 ASSR Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) ""-:':-::·:-::···:·':>:ΐ.25θ 4 DEMA Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) ·1'.250 4 DEMA Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) 1.250 4 DGSCGC Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) 1.250 4 DGSCGC Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) 1.250 4 EHB Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) 1.250 4 EHB Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) 1.250 4 JUH Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) 1.250 4 JUH Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) 1.250 4 JUH Karsten Christoph Llndenstromberg Trainer for training courses and medical advisor 4.200 4 Mol-RO Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) 1.250 4 Mol-RO Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) 1.250 4 MoH-BE Consultant Trainers for training courses (3 trainers, 5 days) (12,5%) 1.250 4 MoH-BE Consultant Trainers for exercise (4 trainers, 4 days) (12,5%) 4 MoH-BE Campus Vesta Training 3.500 4 MoH-BE International Disaster and Emergency Management Support (IDEMS) VZW Training and expertise 10.000 4 l TOTAL 37.700 Form F6 Qther direct costs 1 " 1 ........... . ... ■■■■■'■... Tl B D E G H Coordinator / Beneficiary Reference fo Supplier/ Procedure Description Units type Units n° Unit costs Total costs € Task ID / Action reference ICPD Flyerarlam.de Project flyer Piece 113 0,27 € 3i 5 ICPD Flyerarlam.de Layman's report Piece 112 0,45 € 5 ICPD tbd Project homepage Piece 1 200,00 € 20Q 5 ICPD tbd Project video Piece 1 1.000,00 € 1.000 5 ICPD tbd Transport trucks Piece 4 375,00 € 1.500 4 ICPD tbd Insurance 1 125,00 € 125 4 ICPD tbd Exercise disposables 1 435,00 € 435 4 ICPD tbd Exercise fuel 1 150,00 € 150 4 ICPD tbd Exercise communication 1 150,00 € 150 4 ICPD tbd Exercise maintenance and refurbishing 1 2.000,00 € 2.000 4 ICPD Tbd - through market research Personal protection equipment Piece 20 230,00 € 4.600 4 (required quality with the best price) ICPD Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 1 300,00 € 300 4 (required quality with the best price) Form F6 Other direct costs A B C D e F G H Coordinator / Reference to Beneficiary Supplier/ Procedure Description Units type Units n° Unit costs Total costs € Task ID / Action reference ASSR Flyerarlam.de Project flyer Piece 111 0,27 € 30 5 ASSR Flyerarlam.de Layman's report Piece 111 0,45 € 5 ASSR tbd Project homepage Piece 1 200,00 € 200 5 ASSR tbd Project video Piece 1 1.000,00 € 1.000 4 ASSR tbd Transport trucks Piece 4 375,00 € 1.500 4 ASSR tbd Insurance 1 125,00 € 125 4 ASSR tbd Exercise disposables 1 435,00 € 435 4 ASSR tbd Exercise fuel 1 150,00 € 150 4 ASSR tbd Exercise communication 1 150,00 € ^:.тдаШ15о 4 ASSR tbd Exercise maintenance and refurbishing 1 2.000,00 € 2.000 4 ASSR Tbd - through market research Personal protection equipment Piece 20 230,00 € 4.600 4 (required quality with the best price) ASSR Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 1 300,00 € 300 4 (required quality with the best price) Form F6 E H o Tl A в D G Coordinator / Beneficiary Supplier/ Procedure Reference to Description Units type Units n° Unit costs Total costs € Task ID / Action reference DEMA Flyerarlam.de Project flyer Piece 110 0,27 € ^>■4··-'.-№^30 5 DEMA Flyerarlam.de Layman's report Piece 111 0,45 € 50 5 DEMA tbd Project homepage Piece 1 200,00 € 5 DEMA tbd Project video Piece 1 1.000,00 € 5 DEMA tbd Transport trucks Piece 4 375,00 € 1.500 4 DEMA tbd Insurance 1 125,00 € 125 4 DEMA tbd Exercise disposables 1 435,00 € 435 4 DEMA tbd Exercise fuel 1 150,00 € 150 4 DEMA tbd Exercise communication 1 150,00 € 4 DEMA tbd Exercise maintenance and refurbishing 1 2.000,00 € 2.000 4 DEMA Tbd - through market research Personal protection equipment Piece 20 230,00 € 4.600 4 (required quality with the best price) DEMA Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 1 300,00 € 300 4 (required quality with the best price) Form F6 iláÉfii 1 a E F G S' Coordinator / Reference to Beneficiary Supplier/ Procedure Description Units type Units n° Unit costs Total costs € Task ID / Action reference DGSCGC Flyerarlam.de Project flyer Piece 111 0,27 € 30 DGSCGC Flyerarlam.de Layman's report Piece 111 0,45 € 50 DGSCGC tbd Project homepage Piece 200,00 € 200 DGSCGC tbd Project video Piece 1.000,00 € 1000 DGSCGC tbd Transport trucks Piece 375,00 € 1.500 DGSCGC tbd Insurance 125,00 € 125 DGSCGC tbd Exercise disposables 435,00 € 435 DGSCGC tbd Exercise fuel 150,00 € 150 DGSCGC tbd Exercise communication 150,00 € 150 DGSCGC tbd Exercise maintenance and refurbishing 2.000,00 € 2.000 DGSCGC Tbd - through market research Personal protection equipment Piece 20 230,00 € 4.600 (required quality with the best price) _______ ________ DGSCGC Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 300,00 € 300 (required quality with the best price) ____ ___ Form F6 Other direct costs c A в E F H Coordinator / Reference to Beneficiary Supplier/ Procedure Description Units type Units n° Unit costs Total costs € Task ID / Action reference EHB Flyerarlam.de Project flyer Piece 110 0,27 € 5 EHB Flyerarlam.de Layman's report Piece 111 0,45 € 5 EHB tbd Project homepage Piece 1 200,00 € ■'"^■■■^ľWí-200 5 EHB tbd Project video Piece 1 1.000,00 € 5 EHB tbd Transport trucks Piece 4 375,00 € 4 EHB tbd Insurance 1 125,00 € 125 4 EHB tbd Exercise disposables 1 435,00 € ^.■■^■^'..■435 4 EHB tbd Exercise fuel 1 150,00 € 4 EHB tbd Exercise communication 1 150,00 € 4 EHB tbd Exercise maintenance and refurbishing 1 2.000,00 € 2.000 4 EHB Tbd - through market research Personal protection equipment Piece 40 230,00 € 9.200 4 (required quality with the best price) EHB Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 1 300,00 € 300 4 (required quality with the best price) Form F6 B D E F G H Coordinator / Reference to Beneficiary Supplier/ Procedure Description Units type Units n° Unit costs Total costs € Task ID / Action reference JUH Flyerarlam.de Project flyer Piece 111 0,27 € 30 5 JUH Flyerarlam.de Layman's report Piece 111 0,45 € 50 5 JUH tbd Project homepage Piece 1 200,00 € 200 5 JUH tbd Project video Piece 1 1.000,00 € 1.000 5 JUH tbd Transport trucks Piece 4 375,00 € v;'V^;^H.500 4 JUH tbd Insurance 1 125,00 € 4 JUH tbd Exercise disposables 1 435,00 € ■■■:>ЖЖ.-435 4 JUH tbd Exercise fuel 1 150,00 € ν№4"ι·150 4 JUH tbd Exercise communication 1 150,00 € 150 4 JUH tbd Exercise maintenance and refurbishing 1 2.000,00 € 2.000 4 JUH Tbd - through market research Personal protection equipment Piece 20 230,00 € 4.600 4 (required quality with the best price) JUH Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 1 300,00 € 300 4 (required quality with the best price) Form F6 Other direct costs E G н A IBIMBIl в D F Coordinator / Beneficiary Reference to Supplier/ Procedure Description Units type Units n° Unit costs Total costs € Task ID / Action reference Mol-RO Flyerarlam.de Project flyer Piece 111 0,27 € 30 5 Mol-RO Flyerarlam.de Layman's report Piece 111 0,45 € 50 5 Mol-RO tbd Project homepage Piece 1 200,00 € 200 5 Mol-RO tbd Project video Piece 1 1.000,00 € 1.000 5 Mol-RO tbd Transport trucks Piece 4 375,00 € 1.500 4 Mol-RO tbd Insurance 1 125,00 € 125 4 Mol-RO tbd Exercise disposables 1 435,00 € 435 4 Mol-RO tbd Exercise fuel 1 150,00 € í^^^ÍSO 4 Mol-RO tbd Exercise communication 1 150,00 € 4 Mol-RO tbd Exercise maintenance and refurbishing 1 2.000,00 € 2.000 4 Mol-RO Tbd - through market research Personal protection equipment Piece 20 230,00 € 4.600 4 (required quality with the best price) Mol-RO Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 1 300,00 € 300 4 (required quality with the best price) Form F6 _____ r- A в c D E F G H Coordinator / Reference to Beneficiary Supplier/ Procedure Description Units type Units n° Unit costs Total costs € Task ID / Action reference MOH-BE Flyerarlam.de Project flyer Piece 111 0,27 € 5 MOH-BE Flyerarlam.de Layman's report Piece 111 0,45 € 5 MoH-BE tbd Project homepage Piece 1 200,00 € 5 MoH-BE tbd Project video Piece 1 1.000,00 € 1.000 5 MoH-BE tbd Transport trucks Piece 4 375,00 € 1.500 4 MoH-BE tbd Insurance 1 125,00 € 125 4 MoH-BE tbd Exercise disposables 1 435,00 € 435 4 MoH-BE tbd Exercise fuel 1 150,00 € 150 4 MoH-BE tbd Exercise communication 1 150,00 € 150 4 MoH-BE tbd Exercise maintenance and refurbishing 1 2.000,00 € 2.000 4 MoH-BE Tbd - through market research Personal protection equipment Piece 40 230,00 € 9.200 4 (required quality with the best price) MoH-BE Tbd - through market research Visibility equipment -1 roll-ups and 2 banner Piece 1 300,00 € 300 4 (required quality with the best price) Form F6 c G CD A D E F H Coordinator / Reference to Beneficiary Supplier/ Procedure Description Units type Units n° Unit costs Total costs € Task ID / Action reference ULEI Flyerarlam.de Project flyer Piece 111 0,27 € 30 5 ULEI Flyerarlam.de Layman's report Piece 111 0,45 € 50 5 ULEI tbd Project homepage Piece 1 200,00 € 200 5 ULEI tbd Project video Piece 1 1.000,00 € 1.000 5 . TOTAL 94.800 90 Form F7 "In-kind" contributions / costs not included in the budget й11Й11В111|ЯИД _______________________________________________ Ί Coordinator / Beneficiary Description of cost item Total costs € reference MoH-BE Qualified personal for training and expertise 12.175 MoH-BE Antwerp University Hospital premises for trainings and stakeholder workshop 6.000 18.175 92 ANNEX IV MANDATE1 I, the undersigned, [forename and surname of the legal representative of the future beneficiary signing this mandate], representing, [official legal status orform]2 [official registration No]3 4 [full official address] [VAT number], (‘the beneficiary’), (‘the action’) hereby: 1. Mandate [full official name of the coordinator] [ACRONYM] [official legal status orform] [official registration Nof [full official address] [VAT number], One original version of this Annex to be included for each beneficiary except for the coordinator. 2 To be deleted or filled in according to the "Legal Entity" form 3 To be deleted or filled in according to the "Legal Entity" form 4 To be deleted or filled in according to the "Legal Entity" form 93 represented by [forename, surname and function of the legal representative of the coordinator] (‘the coordinator’) to sign in my name and on my behalf the grant agreement and its possible subsequent amendments with the European Commission. 2. Mandate the coordinator to act on behalf of the beneficiary in compliance with the grant agreement. I hereby confirm that the beneficiary accepts all terms and conditions of the grant agreement and, in particular, all provisions affecting the coordinator and the other beneficiaries. In particular, I acknowledge that, by virtue of this mandate, the coordinator alone is entitled to receive funds from the Commission and distribute the amounts corresponding to the beneficiary’s participation in the action. I hereby accept that the beneficiary will do everything in its power to help the coordinator fulfil its obligations under the grant agreement, and in particular, to provide to the coordinator, on its request, whatever documents or information may be required. I hereby declare that the beneficiary agrees that the provisions of the grant agreement, including this mandate, take precedence over any other agreement between the beneficiary and the coordinator which may have an effect on the implementation of the grant agreement. This mandate is annexed to the grant agreement and forms an integral part if it. SIGNATURE [forename, sumame, function of the legal representative of the mandating beneficiary] Done at [place], [date] In duplicate in English] 94 ANNEX У A. Progress report(s) on the technical and financial implementation In accordance with Article 1.4.1 of the Special Conditions of a grant agreement, the coordinator must regularly inform the Commission in writing on the progress of implementation of the action. Article 1.4.1 specifies the number of the progress reports and the period covered by the reports. The coordinator shall submit each progress report within 60 days following the end of each reporting period. Progress reports should have a maximum length of 4 pages and have as an annex the updated T forms (technical application forms), allowing the Commission to assess the project's progress. Progress reports should contain a summary update of the past, ongoing and planned activities and outputs of the project. They should also contain relevant comments on project management and partnership management aspects. Important Please attach a one-page financial summary highlighting the project expenditure incurred during the reporting period; use the form entitled "Consolidated Cost Statement for the Action", provided as part of Annex VI. 95 B. Structure for the Mid-term and Final Technical Implementation Report 1. Table of contents 2. General reminder (max 1 page) of project objectives, partnership and expected deliverables. 3. General summary of project • General overview of the process implementation process • Comparative analysis of - initial and actual time schedule - planned and used resources - expected and actual results 4. Evaluation of project • Positive aspects / opportunities management/implementation process • Internal and external difficulties encountered • Partnership/core group cooperation (as appropriate) • Cooperation with the Commission • Comments on European value added • Lessons learnt and possible improvements 5. Activities • Comparison between initially planned and actually implemented activities, including monitoring, evaluation and dissemination • Qualitative evaluation of the activities 6. Presentation of the technical results • Description of individual deliverables and deliverables • Purpose of the deliverable (one section per deliverable) • Evaluation of the deliverable • Value-added - in particular European value- added and transferability - of the deliverable • Dissemination 7. Evaluation of the technical results • General lessons learnt and deliverables • Strengths • Possible challenges and/or improvements to be tackled through further action • Recommendations to stakeholders, partners, authorities in charge, National and EU institutions 8. Follow-up • Comparison between initial and current follow­ up measures • Additional follow-up approaches 96 ANNEX VI GUIDELINES FOR COMPLETING THE FINANCIAL STATEMENT FORMS PAYMENT OF FURTHER PHE-FINANCING* AND FINAL BALANCE PAYMENT FOR * Check in Article 1.4.1 of the grant agreement whether it foresees further pre-financing payment! Before completing the tables please read carefully the explanatory notes: (1) For the preparation and submission of the final financial statement, the use of the attached Excel-Workbook is compulsory. In order to have a clear view of the budget consumption at any time during the implementation of the action, it is recommended that you continuously fill in the individual sheet, starting at the beginning of the action and updating them regularly. Please do not attach copies of invoices or time sheets to the final financial statement. You will be contacted by the Commission if supporting documents are required for the analysis of the financial statement. (2) When requesting a payment (further pre-financing, interim or final payment), the following sheets of the Excel-Workbook must be sent to the Commission in a paper version: ■ the "Standard Payment Request and Financial Statement" (completed, signed and dated by the coordinator), - the "Participant Cost Statement Summary" (completed, signed and dated by each of the participants in the project, i.e. coordinator and beneficiary/ies). - the "Consolidated Cost Statement for the action" (completed, signed and dated by the coordinator but only if the project involves beneficiary/ies). It is preferable (although not obligatory) to attach the other sheets of the Excel- Workbook in a paper version. In any case, the entire Excel-Workbook must be provided to the Commission in electronic format (in Excel, not as pdf-file), e.g. on a CD-Rom, memory stick or sent by e-mail. (3) For payment requests for further pre-financing, please refer to art. 11.23 and 11.24 of the General Conditions. (4) In case the project involves beneficiary/ies, each participant (coordinator and each beneficiary) must complete an Excel-Workbook to report their own individual costs. For the beneficiaries there are additional instructions in paragraph (19) at the end of these guidelines. (5) Remember to keep all working documents used in the preparation of the Excel-Workbook and the Excel-Workbook itself both in paper and electronic form for future reference. (6) In all individual sheets, the euro is used as the default currency (and therefore, the default “exchange rate” is “1”). If the coordinator and/or beneficiary/ies have their accounts denominated in other currencies, they shall convert the amounts into euros in accordance with art.n.23.4 of the General Conditions. The monthly exchange rate is published on: http://ec.europa.eu/budaet/contracts qrants/info contracts/inforeuro/inforeuro en.ctm. 97 (7) You are requested to complete all the relevant sheets, providing the requested details and respecting the labelling of each column. Please note that the yellow cells generally contain formulas and should not be completed (unless explicitly specified in these guidelines). In principle, you should only complete non-coloured cells. For example, in the sheet “Participant Cost Statement Summary”, you should only fill in the name of the participant and the amount of "indirect costs/overheads". All other cells (in yellow) will be updated automatically when you complete the other sheets of the workbook. (8) The indirect costs/overheads relate to costs which cannot be directly and exclusively allocated to the project. Typical examples of such costs are office supplies, office rent, telephones, IT, electricity, heating etc.. This list is not exhaustive! Indirect costs/overheads are eligible to up to a maximum of 7% of the total amount of eligible direct costs of each participant. (9) Value added tax (VAT) is eligible, provided that it is included in eligible direct costs, and unless specified otherwise in the Agreement. (10) As a general rule, in order for costs to be considered eligible, they must have been actually incurred and paid, (i.e. proof of payment must be available = transfer of money must be proven) before the submission of the final financial statement. (11) Additional rows can be added to the individual sheets by using the insert rows function in Excel. Please remember to insert these rows after the first and before the last row of the existing sheet in order not to disturb the formulas contained in the table. Please also re­ number the sequential number of the column. (12) "Personnel costs" sheet: for the calculation of the "annual gross salary", the "annual number of working time units" and the "time unit rates", you can use the following table: A Annual salary before tax for the relevant calendar year, including the 13th (or more) monthly salary. B + social charges C + pension contribution D + holiday allowance E + Other F = sum of = annual gross salary A toE G Annual time units (*) H Holidays I Week-ends J Bank (public) holidays K = G- Annual number of working time units (H+I+J) L=F/K Time unit rate(s) (*) For illustration purposes, the annual number of working hours could be calculated in the following way: from the total number of 52 weeks in a calendar year, deduct 5 weeks of holiday and 2 weeks of bank holidays, which results in 45 working weeks. 5 working days per week gives 225 working days, and 7.5 hours per working day, gives 1.687,5 working hours. This calculation can of course vary since it depends on the specific conditions applicable to each individual employer. Please note that the deduction of days for sickness may also be considered, if applicable on the basis of contractual terms. This would normally account for no more than 2 weeks. 98 (13) If staff are employed on a contractual basis (e.g. short-term work contract), the methodology described under paragraph 12 does not necessarily apply. The starting point should be the time unit agreed upon in the contract (and stated in column F), or the final amount paid according to the contract (and stated in column J, in this case please delete the formula for this cell). Details of the contract should be explained in column D. An annual equivalent salary should not be calculated. (14) Despite the specification in columns M-Y in the sheet “Personnel”, separate individual time sheets per employee involved in the project must be kept. If your organisation does not operate with time sheets, you are invited to use the model time sheet provided at the end of this workbook. Please do not attach copies of the time sheets to the final financial statement. It should be stressed that time sheets are mandatory for both contractual and permanent personnel if personnel costs are to be considered eligible for co-funding. For contractual employees a copy of the contract should be kept. Should you use in the "Personnel" sheet a different time unit than the one employed by your organisation for time registration (e.g. days instead of hours), you should provide an explanation on the conversion calculation (e.g. 1 day equal to 7.5 hours/8 hours etc.). (15) The “Equipment” sheet must only contain depreciation costs for equipment, purchased and used during the lifespan of the project, provided that the asset has been purchased in accordance with Article П.9 of the General Conditions and that it is written off in accordance with the international accounting standards and the usual accounting practices of the beneficiary. The costs of rental or lease of equipment or other assets are also eligible, provided that these costs do not exceed the depreciation costs of similar equipment or assets and are exclusive of any finance fee. Only the portion of the equipment’s depreciation, rental or lease costs corresponding to the period set out in Article 1.2.2 of the Special Conditions, and to the rate of actual use for the purposes of the action, may be taken into account. By way of exception, the Special Conditions may provide for the eligibility of the full purchase cost of equipment, where this is justified by the nature of the action and the context of the use of the equipment or assets. (16) "In-kind" contributions and costs not included in the budget (ineligible costs) should be reported in the sheet bearing the same name. Even though these costs are not part of the calculation of the total eligible costs of action, they are, however, important when establishing whether or not any of the participants has generated a profit during the action. Please note that in principle this category could include costs from all other cost categories. Since the layout of the sheet is rather generic, please provide a detailed description for each item concerned. (17) The “Funding from other sources” sheet must contain information on revenues from sources other than the Commission contribution and the coordinator' and/or beneficiaries' own financing of the action, regardless of whether these revenues have already been received or are expected to be received. This information is important in assessing the profit situation of each participant in the action. (18) The “Calculation of payment” sheet contains the calculation sheet for the final grant amount, but it is intended for Commission use only. It is included in the Excel-Workbook for information purposes only. Even though this sheet contains formulae which calculate a possible final grant amount, this calculation cannot be considered as the final amount payable, until the Commission has completed its assessment of the financial statement. This may result in the re-classification or disallowance of some or all costs claimed, should these prove to be ineligible. Instructions for the coordinator when one or several beneficiaries participate in the project 99 (19) When one or several beneficiaries participate in the project, the final financial statement must comprise an individual Excel-Workbook, completed by each of the participants (i.e. coordinator and beneficiary/ies). On the basis of the individual Excel workbooks, the coordinator must produce a “consolidated cost statement”, which must be annexed to the payment request. The relevant table is provided in a separate sheet at the end of the workbook; it is named “consolidated cost statement”. The coordinator beneficiary is requested to complete this sheet by adding up the summary sheet of each participant. This will finally constitute the total costs and revenues of the project. 100 FR01 - Payment Request STANDARD PAYMENT REQUEST AND FINANCIAL STATEMENT Grant agreement number Legal name of the beneficiary Address Reference period Eligiblity From: To: period Banking details: Name and address of the bank Bank account n° I.B.A.N Bank account holder Payment reference (if necessary) ELI contribution requested EUR Pre-financing received EUR Balance payment requested EUR I certify on my honour that the information contained in this payment request is full, reliable and true. I also certify that the costs incurred can be considered eligible in accordance with the grant agreement and that this request for payment is substantiated by adequate supporting documents that can be checked. Name of legal/ statutory representative: Title: Function: Date: Signature: Enclosures: (do not apply for the first installment of pre-financing) - Excel Workbook either on a CD-Rom or sent by e-mail - External audit report if appropriate 101 102 FR02 - Consolidated Cost Statement ATTENTION/to be completed only if the project Involves one or more associated beneficiaries % of eligible Part A: Eligible cost categories Rate % € Part B: Financing Plan € costs A: Personnel EC contribution* B: Travel and subsistence Contribution of the coordinator C: Equipment Contribution of the beneficiary/ies D: Sub-contracting Other sources of funding E: Other direct costs Direct revenues Indirect costs / overheads 0.00% TOTAL ELIGIBLE COSTS 0.00 TOTAL 0.00 * eligible costs x ЕС-funding rate OR maximum ЕС-contribution, whatever is lower! For information only Estimation of “in kind“ contributions / costs not included in the budget (ineligible costs) Date and signature 104 FR03 ■ Participant Cost Statement Participant Cost Statement Summary Name of participant reporting own costs: % of eligible Part A: Eligible cost categories Rate % € Part B: Financing Plan € costs Personnel 0.00 EC-contribution* Travel and subsistence 0.00 Contribution of the Coordinator** Contribution of the Beneficiary Equipment 0.00 reporting own costs Sub-contracting / External assistance 0.00 Contribution of other beneficiary/ies 0.00 Other direct costs 0.00 Other sources of funding 0.00 Indirect costs / overheads 0.00% Direct revenues 0.00 TOTAL ELIGIBLE COSTS 0.00 TOTAL 0.00 * eligible costs x ЕС-funding rate OR maximum ЕС-contribution, whatever is lower! "reporting own costs or contributing to Beneficiary's costs For information only Estimation of "in kind" contributions / costs not included in the budget (ineligible costs) 0.00 VAT-status (please tick appropriate box) □ The reported costs are without VAT. □ VAT is not recoverable and is therefore included in the reported costs. (Proof of non-recoverability attached) Date and signature 106 FR04 - Funding from other sources Contribiitiön of beneficiary/ies Amount in national Exchange Amount of co-funding Name of beneficiary currency rate 1 1 1 1 1 1 Total ' ■ - €0.00 108 FR05 - Personnel costs Total Personnel: €0.00 General information on staff assigned to the project Calculation of the personnel costs A B C D E F G H I J K Function / Type of employment Annual gross Number of time units Total personnel Seq n° Year Name of person Annual number of Time unit rates Exchange Time unit assigned to the costs in national contract salary working time units (ColumnE/G) rate proiect (column Z) currency (1-1*1) 1 : 0.00 1 2 0.00 1 3 0.00 1 4 0.00 1 5 0.00 1 6 0.00 1 7 0.00 1 8 0.00 1 9 0.00 1 10 0.00 1 11 0.00 1 12 0.00 1 13 0.00 1 14 0.00 1 15 У У'/. '-îïï 0.00 Í 16 0.00 1 17 0.00 1 18 0.00 1 19 0.00 1 20 0.00 1 21 ууу;:1-о.оо 1 22 0.00 1 23 0.00 1 24 0.00 1 25 0.00 1 26 0.00 1 27 0;oo 1 28 0.00 1 29 0,00 1 30 0.00 1 Total Explanation of the content of each Column Column Explanation A Sequential number of the entries. In case additional lines are inserted, please re-number the lines B The calender year for which the time units in column M-Y is provided C Name of the person to which the personnel costs refer to D Function in the project of the person listed in column C/ indicate type of employment contract, e.g. permanent, temporary E Annual gross salary, please refer to point 13 of the cover note F Time units used in calculation of the personnel costs, i.e. hours or days (or part thereof) - Please use the same unit as in columns N to Z G The total annual number of working time units, please refer to point 13 of the guidelines H Is obtained by dividing column E by G, except in cases where it is temporary contracted staff where a fixed rate (hourly, daily, weekly, monthly) is negotiated, then the calculation takes starting point in that rate 1 Number of time units assigned to the project (column Z) J Total personnel costs assigned to the project in national currency K Exchange rate used to convert the national currency into € L Total personnel costs assigned to the project in € (column J/ column K) FR05 - Personnel costs L Amount in € (J/K) . . ... : ■ ■ ... :■ ■ . ■■ ^.. : €0.00 FR05 - Personnel costs Time units worked on the project (A) M N 0 P Q R S T U V X Y Z Seqn° January February March April May June July August September October Total per November December calendar year 1 0.00 2 0.00 3 0.00 4 0.00 5 0.00 6 0.00 7 0.00 8 0.00 9 0.00 10 0.00 11 0.00 12 0.00 13 0.00 14 0.00 15 0.00 16 0.00 17 0.00 18 0.00 19 0.00 20 0.00 21 0.00 22 0.00 23 0.00 24 0.00 25 0.00 26 0.00 27 0.00 28 0.00 29 0.00 30 0.00 Explanation of the content of each Column Column Explanation M-Y Specification of the number of time units assigned to the project per month based on the detailed individual timesheet kept per person. Z Sum of columns M to Y 112 FR06 - Travel and Subsistence Total of Travel and subsistence costs: €0.00 A B C D E F G H I j K Reference number Date of Date of Name(s) of person(s) Amount in national Exchange Seq n° of accounting accounting Purpose of the travel and duration Location (from/to) Description of the cost item Amount in € (l/J) payment traveling currency rate document document 1 1 2 1 3 1 4 1 5 1 6 1 7 1 V"·.·: : ■ >; 8 1 9 1 10 1 11 I : 12 1 13 I : 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 1 22 1 23 1 24 1 25 1 ' ' . ■ ■ ■■■■ ·:·· · ■ ■ ■ 26 1 27 1 28 1 29 I 30 Total Explanation of the content of each Column Column Explanation A Sequential number of the entries. In case additional rows are inserted, please re-number the rows B Reference number of the accounting document, which could be travel ticket, hotel invoice, per diem calculation form etc. c Date of the accounting document D Date of payment of the cost item E Name(s) of personfs) traveling F Purpose of the travel, for example participating in various meetinqs, work shops, field exercise etc, and duration G Location: for travel expenses the distance traveled from and to. For hotel costs the location of the hotel. For per diem the country on basis of which tíre per diem is calculated H Description of the cost item, I.e. travel costs, hotel costs or per diem. Please provide one line per cost item 1 Amount in national currency J Exchange rate used to convert the national currency into € K Amount in € (column I/column J) 114 FR07 - Equipment Total Equipment: €0.00 A B c D E F G H I J к Date of Number of Depreciated amount Exchange Depreciated amount Seq n° Payment date Supplier Description of equipment Invoice amount Description of depreciation method used invoice invoice in national currency rate in € (H/l) 1 1 2 1 3 1 4 1 5 1 6 1 -ЖР. .':ЛЖ-...Ж ; ;;; " . v- 7 1 8 1 9 t w :■ -;W"V.,V : ■ 10 1 ЖЖ V . 11 1 v·—,. жж.: ж.ж. 12 1 13 1 ■ 14 1 ..4:· 15 1 ■"V-': ■■ ■: ж”:’') ■ 16 1 17 1 18 1 19 1 í·..,.-·,-..·,..· - ■ 20 1 . -, , .■ 21 1 ... ж-ж 22 1 ; - Ж;::: „■;.·■ 7.^·":· ' 23 1 Ж‘ЖЖ;Ж;Ж,-Г.: 24 1 ■ 7:;:7κ.·ΐ·-'κν. 25 1 26 1 27 I 28 1 . 29 1 30 1 :жжжлжжг..ж,'л:. Total cacio Explanation of the content of each Column Column Explanation 1 | | | A Sequential number of the entries. In case additional rows are inserted, please re-number the rows B Number of invoice of purchase of equipment C Date of invoice of the purchase of the equipment D Date of payment E Supplier F Description of the equipment purchased G Invoice amount H Depreciated amount in national currency 1 Exchange rate used to convert the national currency into € J Amount In € (column tH/column 1) K Description of depreciation method used 116 FR08 - Sub-contracting/ External Assistance Total Sub-contracting: €0.00 A B c D E F G H Date of Date of Invoiced amount in Seq n° Number of invoice Name of sub-contractor Description of sub-contracted item/ service Exchange rate invoice payment national currency 1 I 2 1 3 1 4 1 5 1 6 Ì 7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 1 22 1 23 1 24 1 25 1 26 1 27 1 28 1 29 1 30 1 Total Explanation of the content of each Column Column Explanation A Sequential number of the entries. In case additional rows are inserted, please re-number the rows в Date of invoice c Number of invoice D Date of payment E Name of sub-contractor F Description of the sub-contracted item/ service G Invoiced amount in national currency H Exchange rate used to convert the national currency into € 1 Invoiced amount in € (column G/column H) FR08 - Sub-contracting/ External Assistance I Invoiced amount in € Ï'ï' ь .■■ i;,:.»,'···—. -.„»Ijl? vľrr __ : V — w—."-i. ----------- i------ ■--------------------------------------------------------- FR09 - Other direct costs Total Other direct costs: «ο.οο A B c D E F G H Date of Number of Date of invoiced amount in Seq n° Supplier Description of cost item Exchange rate invoice invoice payment national currency 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 t 21 1 22 1 23 1 24 1 25 1 26 1 27 1 28 1 29 1 30 1 Total Explanation of the content of each Column Column Explanation A Sequential number of the entries. In case additional rows are inserted, please re-number the rows B Date of invoice C Number of invoice D Date of payment E Supplier F Description of the cost item G Invoiced amount in national currency. H Exchange rate used to convert the national currency into € 1 Invoiced amount in € (column G/column H) FR09 - Other direct costs I Invoiced amount in € _JG/HL__ -------------- — ■ FR10 - In-kind contributions/ Cost not included in the budget Total of "In-kind" contributions/ costs not included in the budget: €0.00 A B C Seq n° Description of cost item Estimated amount in € 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Total €0.00 Explanation of the content of each Column Column A Sequential number of the entries. In case additional rows are inserted, please re-number the rows B Description of the cost item D Amount in € 122 Model monthly time-sheet oject Reference ime of Beneficiary/ Partner ime of staff member staff member employed Full-time or Part-time ilendar Year ilendar Month ilendar Day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 case of absence, indicate one of the reason des below lurs worked on this project iurs worked on other projects* iurs worked on other projects* iurs worked on other projects* iurs worked on other projects* iurs worked on other projects* her activities ital hours (including overtime) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 idicate project reference Absences Summary for this month eekend WE Hours worked on this project 0.0 ck leave SL Hours worked on other projects* 0.0 iblic holidays PH Hours worked on other projects* 0.0 inual holidays AH Hours worked on other projects* 0.0 her absence OA Hours worked on other projects* 0.0 Hours worked on other projects* 0.0 Other activities 0.0 Total hours (including overtime) 0.0 ate and signature of staff member Date and signature of Project Manager/ Coordinator/Responsible 124 Katrin Viikmaa Rahandusministeerium [email protected] Meie 13.03.2017 nr 1.8-1/1172-1 Endla 13 10122, TALLINN Terviseameti sildfinantseerimise väljamaksetaotlus projekti „European Modular Field Hospital“ raames Lugupeetud Katrin Viikmaa Palun võimaldada Terviseametil kasutada sildfinantseerimise vahendid kooskõlas Riigieelarve seadus §54 ja Vabariigi Valitsuse 02. jaanuari 2014. a korraldusega nr 19 „Välisabi sildfinantseerimine“ rahastamaks Euroopa Komisjoni projekti „European Modular Field Hospital“. Palun võimaldada sildfinantseerimise vahendite kasutamist alates 13. märts 2017. a summas 38 500 eurot . Sildfinantseerimise vahendite kasutamise periood on 13.03.2017 - 31.12.2017. Grant kood: 9T70-HOSPITAL Eeldatav toetuse laekumise aeg on 30.06.2019.Taotletud välisabi sildfinantseerimise ulatuses ei ole välisabi laekumine kahtluse all. Vahendite osalise või täismahus mittelaekumise korral vastutab Terviseameti projekti sildfinantseerimise jäägi tagastamise eest. Sotsiaalministeerium on nõus sildfinantseerimise jäägi tähtaegselt tagastamata vahendite kinnipidamisega oma eelarvelistest vahenditest. Lugupidamisega (allkirjastatud digitaalselt) Marika Priske Kantsler Lisa: TA taotlus.bdoc Pille Erm +372 6269 728 [email protected] Gonsiori 29 / 15027 Tallinn / 626 9301 / [email protected] / www.sm.ee / registrikood 70001952
Allikas: Sotsiaalministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel