Saatja: Webdesktop <
[email protected]>
Saadetud: 31.10.2019 15:40
Adressaat: MKM info <
[email protected]>
Koopia: Margit Markus Moossen <
[email protected]>
Teema: Webdesktop: Kiri nr 10.2-12.M/1375: Tulemuslikkuse kavade
projektide täielikkuse kontrollimine
TereEdastan Komisjoni kirja.Reg. number: 10.2-12.M/1375Reg. kuupäev:
31.10.2019Sisu: Verification of completeness of Estonias draft
performance plan for the third reference period in accordance with
Article 13(1) of the Implementing Regulation (EU) 2019/317Heade
soovidegaKersti NeemeAEEL sekretär
Ref. Ares(2019)6759803 - 31/10/2019
EUROPEAN COMMISSION
DIRECTORATE-GENERAL l-OR MOBILITY AND TRANSPORT
Directorate E - Aviation
The Director
Brussels,
MOVE.DDG2.E.3/CC-hb-Ares (2019)
HE Mr Clyde KULL
Deputy Permanent Representative
Permanent Representation of Estonia
(By e-mail only)
permrep. eu@tnfa. ee
Subject: Verification of completeness of Estonia’s draft performance plan for
the third reference period in accordance with Article 13(1) of the
Implementing Regulation (EU) 2019/317
Dear Ambassador,
We would like to thank you for the submission of Estonia's draft performance plan for
RP3.
With the support of the Performance Review Body, we have now concluded the
verification of completeness of your draft performance plan in accordance with Article
13(1) of Implementing Regulation (EU) 2019/317 (Performance and Charging
Regulation). As a result of this verification, we have identified specific elements of the
plan, which need to be updated in order to establish compliance with the requirements
contained in Articles 10(2), 10(3) and 10(4) of Implementing Regulation (EU) 2019/317.
You will find attached our detailed findings resulting from the verification of
completeness. You are requested to complement and/or amend the sections of the draft
performance plan listed in Annex. Other amendments of the draft performance plan are
not permitted and will not be taken into account for the performance plan assessment
referred to in Article 14 of Implementing Regulation (EU) 2019/317.
In accordance with Article 13(2) of Implementing Regulation (EU) 2019/317, we invite
you to submit the updated draft performance plan via the ESSKY portal within a
timeframe of three weeks from the date of this request.
We kindly ask you to provide, together with the updated draft performance plan, a list of
the amendments applied in order to address our findings.
This document also has to be submitted on the ESSKY platform, and should be filed
under Aimex T of the updated draft performance plan.
Commission europeennc/Europese Commissie, 1049 Bruxelles/Brussel, BELG1QUE/BELGIË - Tel. -K52 22991111
Office: DM24 05/076 - Tel. direct line r-32 229-69219
l-’il ip.Corneli.s47ec,europa eu
We look forward to receiving your updated draft performance plan as soon as possible
and thank you in advance for your cooperation.
Yours sincerely,
Enclosure: ANNEX - Verification of completeness of the draft performance
plan of Estonia
2
ANNEX
Verification of completeness of the Draft Performance Plan of Estonia
The table below presents the findings resulting from the verification of completeness,
which have to be addressed as part of the updated performance plan. The findings are
listed in the order of appearance of the draft performance plan sections.
Nr Draft Topic Finding
Performance
Plan
section1
1.
2.1 (and Costs Several Member States have indicated their
following associated with intention to include, in their RP3 cost bases, costs
when relating to related to relating to drone detection or drone
applicable); drone detection defence systems or costs relating to unmanned air
3.4; or drone traffic management services.
4.2; defence
Annex A - systems or However, pursuant to a preliminary analysis, these
Reporting costs relating to costs do not seem eligible for the establishment of
Tables (En unmanned air the cost base for air navigation charges.
route); traffic Costs other than costs of providing air navigation
Annex B - management services are not amongst eligible cost elements for
Reporting services this cost base in accordance with Article 15 of
Tables Regulation (EC) No 550/2004. Drone detection,
(Terminal) drone defence or unmanned air traffic
when management services are not amongst the air
applicable. navigation services as defined in Article 2 (4) of
Regulation (EC) No 549/2004.
If such costs were included in the draft
f-.
performance plan, they have to be removed from
the determined costs. This applies both in respect
of en route and terminal cost bases.
You are also expressly requested to confirm, in a
statement to be attached under Annex T of the
updated draft performance plan, that the
determined costs established under the
performance plan do not comprise any costs
related to relating to drone detection or drone
defence systems or costs relating to unmanned air
traffic management services.
2. 2.1 (and Investment Inconsistencies have been observed in many
following costs, PCP performance plans between the amounts reported
1 Reference to Excel template for RP3 performance plans and/or to associated Annexes.
3
when per ANSP for investments in part 2 and the
applicable); amounts reported in Annexes A and B in respect
4.2; of the costs of new and existing investments for
Annex A - the same ANSP (Table 1 - items 1.4, and 3.10 to
Reporting 3.12) and information on major investments is
Tables (En often incomplete in part 2.
route); Similarly, inconsistencies have been observed in
Annex B - respect of common projects, between part 2, part
Reporting 4.2, and the information reported in Annexes A
Tables and B (Table 1 -- item 3.9; additional information
(Terminal) 1 (j); Table 4 and additional information 2 (1);
when Tables 2 and 3 in respect of union funding.
applicable. Please ensure the completeness of these different
elements and their consistency throughout the
performance plan and its annexes.
3. 3.1 Safety targets Measures to achieve the safety targets by 2024 are
not or not sufficiently described.
Although, it is acknowledged that the definition of
the Safety Key Performance Indicator,
Effectiveness of Safety Management, was not
published prior to the required submission date of
Performance Plans, please provide the missing
elements in the updated plan on the basis of
EASA’s Notice of Proposed Amendment (NPA)
on the “Measurement of the SKPI and SPIs in the
SES Performance and Charging Scheme” for RP3
at : https://www.easa.europa.cu;'dociunent-
librarv/notices-oHjioDosed-amendmenl or clarify
when these could be made available.
4. 3.3.1 c) En route Capacity improvement measures should be
ATFM delay described, in line with the NOP for en-route.
per flight Please correct.
5. 3.3.2 c) Terminal and Capacity improvement measures should be
airport ANS described for terminal.
ATFM arrival Please correct.
delay per flight
6. 3.3.2 c) Main measures No information has been provided under this
put in place to heading of the PP, as required by para. 3.2, Annex
achieve the II of the performance and charging Regulation.
targets for Please complete.
terminal
(arrival ATFM
delay per
flight)
7. 3.4.1; Inflation The inflation forecast used in the PP for the years
Annexes A, forecast 2019 (2.50%), 2020 (2.50%) and 2021 (2.40%)
B- differs from the IMF April forecast (3.0% for
Reporting 2019, 2.80% for 2020 and 2.60% for 2021).
Tables (ER Please correct.
and TRM)
8. 3.4.1 .b) Total en route According to the note added in section 3.4.1 of the
& Annex A service units PP, the service units used correspond to the
4
- En route STATFOR Feb 2019 Base forecast based on the
Reporting “flight plan (M2)“ methodology. However,
Tables according to para. 1.2 of Annex VIII of the
performance and charging Regulation, the service
units have to be calculated according to the “actual
route (M3)” methodology. The M2/M3 correction
factor was published in Annex IV of the
“EUROCONTROL Seven-Year Forecast February
2019“. The en route service units to be used for
the 2020-2024 period are the ones presented in
section 1.2.1 of the submitted PP.
Please correct.
9. 3.4.2.b) Total terminal The terminal service units included for the year
& Annex B service units 2024 are inconsistent with the figure presented in
- Terminal section 1.2.2, which is in line with the STATFOR
Reporting February 2019 Base forecast.
Tables Please correct.
10. 3.4.1.1) Main measures No information has been provided under this
3.4.2.f) put in place to heading of the PP, as required by para. 3.2, Annex
achieve the II of the performance and charging Regulation.
targets for cost Please complete.
efficiency
11. 3.4.3 Pensions Although the performance plan provides costs
under the pension section, pension costs are not
separately identified in the en-route and terminal
reporting tables (sub item under item 1.1). We
understand that this apparent inconsistency is due
to the fact that the costs reported in the
performance plan correspond to the total social
security contributions and that it is not possible to
extract precisely the pension element from these
total social security contributions.
Please confirm or clarify.
12. 5.2.1.2 a) Capacity The en route incentive scheme pivot values are
incentive modulated for year N, however no information is
schemes provided on the principles for the modulation.
Please complete.
13. 5.2.2.2.a) Capacity The terminal route incentive scheme pivot values
incentive are modulated for year N, however no information
schemes is provided on the principles for the modulation.
Please complete.
14. Annex A - Cost of capital There are inconsistencies between the amounts
Reporting reported for the ANSP in reporting table 1 and in
Tables (En the additional information.
route); Please align.
Annex B -
Reporting
Tables
(Terminal)
Electronically signed on 29/10/2019 09:38 (UTC+01) in accordance with article 4.2 (Validity of electronic documents) of Commission Decision 2004/563