dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Majandus- ja Kommunikatsiooniministeerium
Sissetulev kiriAvalik

Kiri

Majandus- ja Kommunikatsiooniministeerium · 22. november 2019
Viit
24.1-2/2019/8709
Registreeritud
22. november 2019
Dokumendi liik
Sissetulev kiri
Adressaat
European Commission
Saabumis/saatmisviis
e-post
Funktsioon
24.1 EL ja rahvusvahelise koostöö korraldamine
Sari
24.1-2 EL-ga seotud kirjavahetus (Arhiiviväärtuslik)
Toimik
24.1-2/2019
Vastutaja
Timo Tatar (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Energeetika valdkond)
Lahendamise tähtaeg
27. november 2019

Failid

  • 📎E-kiri.pdf74 KB
  • 📎Invitation BEMIP HLG synchronisation SO_28_11_2019(2).pdf220 KB
  • 📎Way forward on the methodlogy for capacity calculation with third countries for ARES.pdf152 KB

Sisu (failidest)

Ref. Ares(2019)7215287 - 22/11/2019 Third countries capacity calculation Legal requirements The Guideline on Capacity Allocation and Congestion Management (Commission Regulation (EU) 1222/2015) (CACM) sets out the methods for calculating how much capacity can market participants use on cross-border lines without endangering system security. In line with CACM, capacity calculation methods need to be agreed within the Capacity Calculation Region. This applies also to calculation methods with third countries, as they have an impact on internal capacities. Ideally, all the TSOs of the Baltic Capacity Calculation Region (LV, LT, EE, FI, SE, PL) would need to agree (either explicitly or tacitly) on a common capacity calculation methodology with third countries, and submit the same version to their NRAs for approval. However, as in practice, Sweden, Poland and Finland are not affected, only the agreement between the three Baltic States could be sufficient. In case the TSOs do not agree on a proposal to the NRAs, it is for the Commission to facilitate the adoption of a methodology (Art. 9(4) CACM). This mainly mandatory methodologies pursuant to CACM and the respective deadlines defined therein. If the TSOs submit the request to their respective NRAs and the NRAs do not agree, then ACER takes a decision in this respect. Any breach of the provisions regarding capacity calculation methods, such as any unilateral action not involving all the three Baltic States, entails a breach of the CACM Regulation that is of direct application. This could lead to legal challenges by any of the parties that have not been involved in the procedure, by market participants in the Baltic States and by the Commission (infringement). Technical solution Following the discussions regarding the new capacity calculation methodology with third countries, it was agreed that the way forward will be a common solution agreed by three Baltic States to be achieved by March/April 2020. Given that the physical realities of electricity flows in the BRELL Ring, only a technical solution taking into account all infrastructure in the Baltic States can be considered. Commercial solution On top of the technical solution, the three Baltic States agreed to also consider a commercial layer that would address also political concerns leading to an acceptable solution for the methodology. The guiding principles of the commercial layer are as follows:  Trade volumes with Kaliningrad will not be constrained and Kaliningrad’s energy security will be safeguarded;  Guarantees of origin for electricity can be requested from the Russian traders;  No additional risks for energy security in the Baltic States. Way forward The Baltic States at Senior Official level will negotiate and agree on a commercial solution that takes into account the three principles mentioned above. They will be advised by their TSOs and NRAs and DG ENER will facilitate discussions and a compromise. In their proposals and considerations, the Baltic States can take into account the value of current and historical imports from third countries in terms of capacity utilization and volume. Historical values of imports from Belarus could be considered for exclusion. We would like to invite that the Baltic States already exchange any proposals and data available in due time before the next senior officials’ meeting on 28 November. Saatja: CACI Simone(ENER) <[email protected]> Saadetud: 22.11.2019 11:56 Adressaat: EGLITIS Eriks (Ministry of economics of the republic of latvia) <[email protected]>; PURLYS Egidijus (MINISTRY OF ENERGY OF THE REPUBLIC OF LITHUANIA) <[email protected]>; PURLYS Egidijus (MINISTRY OF ENERGY OF THE REPUBLIC OF LITHUANIA) <[email protected]>; MKM info <[email protected]> Koopia: ILJINA Inga (Permanent Representation of Latvia = Représentation permanente de la Lettonie) <[email protected]>; NAVICKAITE Jolanta (Permanent Representation of Lithuania to the EU) <[email protected]>; Reesi-Reena Runnel <Reesi- [email protected]>; kristiina tammeraid <[email protected]>; VAINUTE Sandra (MINISTRY OF ENERGY OF THE REPUBLIC OF LITHUANIA) <[email protected]> Teema: Ares(2019)7215287 - BEMIP synchro SO invitation Manused: Way forward on the methodlogy for capacity calculation with third countries for ARES.pdf; Invitation BEMIP HLG synchronisation SO_28_11_2019(2).pdf Dear all, Please see attached, as discussed, the invitation for the BEMIP Synchronisation Senior Officials’ meeting to take place on 28 November at 15:00 in Brussels. Please also see attached a one-pager description of the principles agreed upon so far. Best regards, Klaus-Dieter Borchardt Deputy Director-General European Commission Directorate General for Energy 24, Rue (Jean-André) De Mot Ref. Ares(2019)7215287 - 22/11/2019 EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR ENERGY The Deputy Director-General Brussels, ENER/KDB/AIC/sc(2019)s7988951 Mr Egidijus Purlys Vice-minister for energy, Lithuania Mr Timo Tatar Deputy Secretary General for energy Federal Ministry for Economic Affairs and Communications, Estonia Mr Ēriks Eglitis Secretary of State Ministry of economics, Latvia Dear Sirs, I would like to invite you to a meeting of the High-Level Group of the Baltic Energy Market Interconnection Plan (BEMIP HLG) on the synchronisation project (at senior officials’ level) taking place on 28 November 2019 between 15.00 and 16.30 in Berlaymont, Rue de la Loi 200, 1049 Bruxelles, room Robert Schuman. The aim of the meeting is to follow-up on our discussions of 30 October 2019 on coordinating the way forward regarding relations with third countries before 2025 in the presence of representatives from the transmission system operators and national regulatory authorities. Please see attached to this invitation a short non-paper outlining the principles of the compromise solution as agreed so far. I would appreciate if you could confirm your participation to the meeting. For your access to the Berlaymont building, please register your presence as well as the participation of all accompanying persons (including a representative of the transmission system operator and of the national regulatory authority) at the following link: https://ec.europa.eu/eusurvey/runner/BEMIP_HLG_Synchro_officials_28Nov19 Yours sincerely, Klaus-Dieter BORCHARDT Commission européenne/Europese Commissie, 1049 Bruxelles/Brussel, BELGIQUE/BELGIË - Tel. +32 22991111 Office: DM24 04/083 - Tel. direct line +32 229-94011
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel