Audit report form v.5
AUDIT OF OPERATION REPORT
Central Baltic INTERREG V A Cross-border Co-operation Programme 2014 – 2020
AUDIT NUMBER: CB-23/2021
Date of final audit report 11/06/2021
Contradictory procedure 08/06/2021
Accounting period 01/07/2020 – 30/06/2021
Audit scope Progress report No. 4.1 in the amount of 100 594.89 EUR, audited 100 %
Andreas Kalm, Audit Manager, Auditor of II Audit Unit Financial Control Department
of Ministry of Finance of Estonia Suur-Ameerika 1, 10129 Tallinn, Estonia;
Auditor(s)
Kadi Peets, Audit Supervisor, Head of the II Audit Unit, Financial Control
Department of Ministry of Finance of Estonia Suur-Ameerika 1, 10129 Tallinn,
Estonia
Tallinn City Government
Tallinn Transport Department
Audited organisation
Mr. Tiit Laiksoo
& contact information
Phone: +372 5094 654
Email:
[email protected]
Place of the audit Tallinn Transport Department
Persons present during the audit Tiit Laiksoo
N/A, due to covid-19 pandemic the audit team did not carry out on-the-spot
Date of on-the-spot checks check. Despite that, the auditors have obtained sufficient assurance in other
ways, no follow-up on-the-spot checks are not necessary.
Creation of the interoperability between the electronic ticketing
Full project name
systems in Estonia and Finland.
Project Number & Acronym CB737 – E-TICKETING
Priority Axis 3. Well-connected Central Baltic region
Specific Objective SO 3.1 Improved transport flows of people and goods
Reporting Period 01/11/2019 – 30/04/2020
Name of the Lead Partner Tallinn City Government
Project duration
01/05/2018 – 30/04/2022
(start and end dates)
Based on the audit work performed we have obtained reasonable assurance that the
expenditure declared under the audited operation CB737 – E-Ticketing within
priority axis 3 in the reference year 01/07/2020 – 30/06/2021 is, in most material
aspects, legal and regular.
AUDIT
However, the auditor made one major finding with a financial impact in regard to
CONCLUSION
carrying out public procurements. In addition, the auditor has identified a risk to
the sustainability of the results. The summarized list of findings identified during
the audit is presented in the following table and report.
Page 1
Audit report form v.5
Number
Total Financial Total Financial
of Nature of the finding(s)
Impact Impact ERDF
findings
1 €387.08 €325.14 The lead partner has not carried out the procurement with a
within the audit within the audit reference no 188772 in compliance with the Public Procurement
scope scope Act (Major finding, with financial impact)
Page 2
Audit report form v.5
PART 1 – AUDIT SCOPE
According to Article 127 of Regulation (EU) No 1303/2013 the audit authority is responsible to carry out
audits of operations on the basis of supporting documents constituting the audit trail and verify the legality
and regularity of expenditure declared to the Commission, including the following aspects:
a) that the operation was selected in accordance with the selection criteria for the Operational
Programme, was not physically completed or fully implemented before the beneficiary submitted
the application for funding under the Operational Programme, has been implemented in accordance
with the approval decision and fulfilled any conditions applicable at the time of the audit concerning
its functionality, use, and objectives to be attained;
b) that the expenditure declared to the Commission corresponds to the accounting records and that
the required supporting documentation demonstrates an adequate audit trail;
c) that for expenditure declared to the Commission determined in accordance with Articles 67(1)(b)
and (c) and 109 of Regulation (EU) No 1303/2013 and Article 14(1) of Regulation (EU) No 1304/2013,
outputs and results underpinning payments to the beneficiary have been delivered, participant data
or other records related to outputs and results are consistent with the information submitted to the
Commission and that the required supporting documentation demonstrates an adequate audit trail.
PART 1.1 – LIMITATION OF SCOPE
The conclusions of the audit are based on the analysis of the procedure in place, information and documents
gathered and interviews conducted in the audited bodies as well as the tests performed in the course of the
audit following the checklist for the audit areas.
PART 1.2 – AUDIT METHODOLOGY
The audit is carried out in compliance with internationally accepted auditing standards and the audit
strategy, which is approved by the audit authority and group of auditors representing each Central Baltic
INTERREG VA Programme Member State.
The audit process comprises of three stages:
a) Preparation and planning of the audit
In this stage legal regulations and other documentation, including from the management verification
ex Regulation (EU) No 1299/2013, Article 23(4), needed for familiarising with the selected
operations were collected and analysed. Also, interviews or checklists which were needed for the
planning of the audit, familiarising with the functioning of the system, project files structure, the
objectives and the status of implementation of the operations, the risk encountered during the
implementation as well as those inherent to the type of operations.
b) Fieldwork
At this stage a whole range of interviews with responsible staff were conducted, documents were
gathered and testing was performed. In order to attain the audit objectives during the audit we
tested all applicable audit areas. We performed the audit using the checklists for the several audit
areas which enabled us to verify the requirements laid down in European and national legislation.
The assurance about the achievement of the project’s objectives was attained via documentation
uploaded to the programme’s information system (eMS), e-mail conversation with the project
partner, mobile application and photos of the project outputs.
Page 3
Audit report form v.5
c) Reporting
This stage encompassed activities related to the preparation of the Draft Report and the
contradictory procedure where auditee has been granted 10 working days to reflect on the audit
report, the inclusion of their replies and comments and the submission of the Final Report.
Provide the actual schedule of the contradictory procedure as following
Preliminary report: 26.05.2021
Final report: 11.06.2021
PART 2 – FINANCIAL DATA OF OPERATION
Financial data of audited partner must be listed
PART 4.1 – BUDGET (EUR)
Audited Partners approved budget Granted in total for % Payments included %
the partner in the payment
claim
ERDF € 84 499.71 84% € 84 499.71 84%
Public funding (total) € 16 095.18 16% € 16 095.18 16%
Private funding € 0.00 0% € 0.00 0%
Income € 0.00 0% € 0.00 0%
TOTAL PARTNER BUDGET € 100 594.89 100% € 100 594.89 100%
Audited expenditure (according to the Sample)1
Total amount audited Ineligible
Budget Line (combining milestones)
1. Staff costs € 17 021.27 € 0.00
2. Office and administration € 2 553.19 € 0.00
3. Travel and accommodation € 2 633.33 € 387.08
4. External expertise and services € 78 387.10 € 0.00
5. Equipment € 0.00 € 0.00
6. Infrastructure and works € 0.00 € 0.00
Total amount audited € 100 594.89 € 387.08
PART 3 – FINDINGS AND RECOMMENDATIONS
PART 3.1 GENERAL
During the audit we identify and document audit findings. We categorise these findings by reference to the
level of importance. The categories which we use to classify our findings are as follows:
Findings which have a financial impact above EUR 250 (ERDF) or any other high-
Major
risk deficiencies.
Findings for which action should be taken to ensure full compliance but have a
Minor limited financial impact (below EUR 250 (ERDF)), no financial consequences or
no high-risk character.
1
Costs outside the sample were not audited
Page 4
Audit report form v.5
All audit findings are reported in the final audit report, even if the Member States participating in the
Programme may decide that neither the lead beneficiary nor the Programme's MA is obliged to recover an
amount unduly paid which does not exceed EUR 250, per operation and accounting year, not including
interest, in contribution from the Funds and the EMFF, as all the irregular amounts detected are to be taken
into account for the calculation of the annual Total Error Rate of the Programme.
PART 3.2 FINDINGS AND RECOMMENDATIONS PER BUDGET LINE
In this paragraph the findings and recommendations per audit area are included.
E. Procurement procedures
Audit Finding No. 1 - Tallinn Transport Department has not carried out the procurement with a
reference no 188772 in compliance with the Public Procurement Act. Ineligible costs € 387.08 within
the audit scope.
According to the Central Baltic Programme manual point 3.7 public procurements should be done
according to national rules or following EU rules, depending on the thresholds.
The lead partner Tallinn Transport Department has carried out an open procurement with a reference no
188772 “Travel agency services (Reisikorraldusteenused)” electronically in the e-procurement register
(published on 30.06.2017). Service contracts were awarded on 06.11.2017 to tenderers CWT Estonia AS,
AS Wris and AS Baltic Tours with a total contract amount 1 000 000.00 EUR according to the contract award
notice published in TED (2017/S 223-464297).
Auditors have identified a noncompliance with the Estonian Public Procurement Act:
1. § 3 subsection 3: all persons whose place of residence or seat is in Estonia, in another Member State
of the European Union, in another contracting party to the EEA Agreement or in a state that has
joined the Government Procurement Agreement (GPA) of the WTO, must be treated equally and
without discrimination by the contracting authority and the contracting authority must make certain
that all restrictions and criteria established for the persons are proportional, relevant and justified in
relation to the purpose of the public procurement;
2. § 39 subsection 1: the contracting authority will verify whether the financial and economic standing
and the technical and professional ability of a tenderer or candidate comply with the award criteria
specified in the contract notice.
The award criteria must be sufficient for proving the tenderer’s or candidate’s ability to duly perform the
public contract and relevant and proportional to the nature, quantity and purpose of the supplies, services
or public works that constitute the object of the public contract.
As a result of the audit procedures, the auditors identified the following risks:
1. The procurement contract notice contains restrictive selection criteria: III.2.3) technical and
professional ability of a tenderer: Tenderer must be a member of the International Air Transport
Association for at least 3 years from the date the contract notice has been published in the state
procurement register. Tenderer must submit a copy of IATA certificate.
Page 5
Audit report form v.5
The contracting authority must make certain that the selection criteria established in the contract notice
are proportional, relevant, non-discriminatory and reasoned in relation to the purpose of the public
procurement, must not distort the competition by excluding companies, who have been operating in the
market less than 3 years and can prove their ability to fulfill the contact according to the requirements.
Thus, the requirement to be a member of the International Air Transport Association for at least 3 years is
not proportional, distorts the competition and does not show the ability of the tenderer to fulfill the
contract.
2. Significant modification of contract ‒ contract duration has been extended and initial value of the
contract exceeded by 57%.
Service contracts were awarded on 06.11.2017 to CWT Estonia AS, AS Wris and AS Baltic Tours for € 1
million as stated in the contract award notice following an open procedure. According to the contract point
10.1, contracts with CWT Estonia AS, AS Wris and AS Baltic Tours entered into force 01.01.2018 and were
valid 24 months. On 12th of December 2019 amendments to the initial contracts with AS Baltic Tours and
CWT Estonia AS, on 10th of December 2019 with AS Wris were concluded to extend the contract duration
until 14th of February 2020 in accordance with Public Procurement Act §123 (1) 1). According to the
Procurement Register the final value of the contracts is € 1 761 792.02 (excl. VAT).
A modification of a contract during its term shall be considered to be substantial, where it renders the
contract materially different in character from the one initially concluded. (Article 72(4) of Directive
2014/24/EU)
Auditors are in the opinion that the contract modifications do not comply with the requirements in §123
(1) 1) of the Public Procurement Act . Auditors find that modifications leading to an increase of the contract
price of 57% are substantial, caused by insufficient planning by the contracting authority and could have
been avoided by timely preparation of a new tender.
CONCLUSION AND RECOMMENDATIONS:
In auditors opinion the abovementioned requirements are restrictive, thus not ensuring equal access for
tenderers and have the effect of creating unjustified obstacles to the opening up of public procurement to
competition. Contracting authority made a significant modification to contracts with CWT Estonia AS, AS
Wris and AS Baltic Tours, contract duration has been extended and initial value of the contracts exceeded
by 57%.
The above findings will result in a financial correction of 25% of the certified expenditure due to a
substantial contract modification according to point 23 (2) of the Guidance on financial corrections
(C(2019) 3452 final dated 14/05/2019).
1) Recommendation to the auditee:
It is recommended to the beneficiary to make a refund in amount of the ERDF co-financing € 325.14 (84%)
and to deduct the ineligible co-financing € 61.94 (16%) from the project’s overall eligible expenditure.
These sums will result in a financial correction rate of 20% because the First Level Control already made
5% of deductions in the audited period (4th report of the project).
Page 6
Audit report form v.5
2) Recommendation to the First Level Control
It is recommended to pay attention to the travel and accommodation costs related to procurement with
a reference no 188772 in this project and in other projects where Tallinn City Government is one of the
partners. Those costs may be affected by the same error. If similar cases are found, the costs should be
deducted where possible and the Managing Authority should be notified. In the 4th report of the project,
FLC detected a restrictive selection criterion and made a 5% deduction.
In view of the findings above, the auditors recommend to additionally apply a financial correction of 20%
of the travel and accommodation costs as the amount of the service contract was significantly expanded.
3) Recommendation to the Managing Authority
It is recommended to begin a procedure to recover the ineligible amounts. Concerning the amount in audit
scope, the auditor recommends to reclaim the ineligible ERDF funding of € 325.14 and deduct the ineligible
co-financing of € 61.94 from the partner’s budget.
The Managing Authority should identify all projects containing ineligible costs resulting from the
procurement with a reference no 188772 and apply financial correction of 25% to the certified
expenditure. The FLC made 5% deduction from the 4th period of the project, but the correction rate of
25% should apply for the previous periods also.
Auditee response:
The procurement procedure for travel agency services was not carried out by Tallinn Transport
Department. This process was conducted by Tallinn City Office and the resulting contract is mandatory and
binding to all departments.
First Level Control response:
FLC will make a corrections and deducts additional 20% from costs of the travel and accommodation costs
related to procurement with a reference no 188772 in this project and in other projects where Tallinn City
Government is one of the partners.
In future the FLC will pay more attention to the travel and accommodation costs related to procurement
and also will look into framework contracts more detail and analyse the extent of the value if its possible.
Based on the travel services reflected in Project reports, FLC does not usually have by the time we certify
submitted costs enough information to assess the purchase of travel services used at the entire
procurement Tallinn City Government. Therefore, it is often not possible for the FLC to assess the total
value of the framework contract and its overrun.
Managing Authority response:
The MA will only provide general comments in this case. Firstly, we confirm that to our knowledge this
procurement was checked by the State Service Centre procurement experts. The MA welcomes the use of
procurement expertise in the FLC. According to the MA understanding, the procurement has been
correctly carried out at the time of the check. If later developments change this, and an audit
recommendation is made, the MA will take this for information and make any necessary corrective steps.
Page 7
Audit report form v.5
H. Reality of operation and fulfilment of the operation objectives
Identified risk – There is a possibility that the results of the project are no longer available after the year
2023.
According to the Central Baltic Programme manual point 3.8 the results and outcomes of the project must
remain available for at least 5 years from the end date of the project.
The auditors identified a risk that is related to the sustainability of the project results. The project Lead
Partner Tallinn City Government (Transport Department) has existing procurement contract with Ridango
AS for the maintenance, management, and development of public transport ticketing systems. This
contract is valid until June 2023 (procurement no 170046). Due to this existing contract, Ridango AS was
the only possible software developer to integrate the ticketing systems involved in the project. Due to the
existing contract, Ridango AS will be able to maintain the results of the project until the end of the contract
in 2023. There is a risk that if Ridango AS is not a new service provider of the public transport ticketing
systems after 2023, there is a possibility that the results of the project will no longer be available.
At the time of the audit, the risk does not involve ineligible costs.
1) Recommendation to the auditee:
In the context of the project, it is advisable to think about how the results of the project could be
successfully used after June 2023. As a second recommendation, in the case of similar projects in the
future, we recommend thinking about the ownership of the product being developed and who owns the
results. In this way, it is possible to manage various risks lying by the contracting authority, including having
the maximum use of the products or services developed with the finances of the contracting authority or
having the maximum effect of competitive offers for having further developments.
2) Recommendation to the Managing Authority
Our recommendation is to monitor the project and follow-up the use of the project results after the
current public procurement contract has been ended and a new procurement will be launched.
Auditee response:
Sustainability of the project results is guaranteed by incorporating similar requirements into terms of
reference during procurements in the future.
Managing Authority response:
The Managing Authority agrees with the recommendation. This is an important topic, and the MA thanks
the auditors for pointing this risk out. As part of the closure of a project, the MA sends to all projects a
closure letter, reminding of requirements after the project end. This letter is typically sent 1-1,5 years after
the project has ended. At the same time, the MA sends out a survey, collecting input about how the project
durability has developed. The MA will pay particular attention to the replies of this project as well as
commit itself to individual follow-up.
Page 8
Audit report form v.5
Final conclusion by the auditors:
According to the sustainability risk identified by the auditors and the auditee’s response, the auditors
would also like to emphasize the rules and regulations for carrying out public procurement. If the solution
to ensure the sustainability of the results is to add similar requirements to the terms of reference in the
future, it is recommended to analyze in detail the compliance of the requirements to the general principles
of public procurements to avoid potential risk where the conditions of the new procurement are
restrictive. Depending on the type of procurement, such conditions may favor a particular tenderer and
not all tenderers will participate in the procurement on an equal footing. In order to avoid such situations
in the future, the auditors recommend that new potential risks be taken into account when organizing a
new procurement.
PART 4 - FOLLOW-UP
This audit report is compiled for use of the Audit Authority of the Central Baltic INTERREG VA 2014-2020
Programme and will be used to draw conclusions about the functioning of the Management and Control
Systems of the above-mentioned Programme. Information in the report will be disclosed to relevant parties
involved of management of the EU funds, including Commission services.
Parties responsible of audit finding follow-up:
1. Findings with Financial impact – The Audit Authority (AA) will inform the Managing Authority (MA)
to take necessary actions to correct shortcomings in the system;
a. Deductions will be made by the MA;
b. Confirmation of deductions will be made by the AA;
c. If needed follow-up audit will be done by Group of Auditor (GoA) members.
2. Findings without the Financial impact
a. The MA will be informed and evaluation will be done if further actions are needed;
b. Confirmation of actions will be followed-up by the AA and if needed by the GoA members.
Upon request from the MA the Auditee is responsible to implement the recommendations and deliver the
proof to the MA.
Audit Manager: Andreas Kalm
Signed electronically
Audit Supervisor: Kadi Peets
Signed electronically
Page 9
Hr Mihhail Kõlvart
Tallinna Linnavalitsus Meie 11.06.2021 nr 10-5/4528-1
[email protected]
Auditi lõpparuande edastamine
Austatud härra Kõlvart
Edastame Teile Kesk-Läänemere INTERREG V-A programmi projekti nr CB737
„E-TICKETING“ projektiauditi lõpparuande nr CB-23/2021.
Täname Teid meeldiva koostöö ja osutatud abi eest.
Lugupidamisega
(allkirjastatud digitaalselt)
Kaur Siruli
Finantskontrolli osakonna juhataja
Lisa:
Auditi lõpparuanne (9 lehel)
Sama:
Pr Imbi Uusjärv, Riigi Tugiteenuste Keskus (
[email protected])
Andreas Kalm 611 3133
[email protected]
Suur-Ameerika 1 / 10122 Tallinn / 611 3558 /
[email protected] / www.rahandusministeerium.ee
registrikood 70000272