dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Rahandusministeerium
Väljaminev kiriAvalik

Süsteemiauditi lõpparuande edastamine

Rahandusministeerium · 29. juuni 2021
Viit
10-5/4934-1
Registreeritud
29. juuni 2021
Dokumendi liik
Väljaminev kiri
Adressaat
Riigi Tugiteenuste Keskus, Riigi Tugiteenuste Keskus, Riigi Tugiteenuste Keskus
Saabumis/saatmisviis
e-post
Funktsioon
10 VALITSUSE SISEKONTROLLISUSTEEMI KOORDINEERIMINE NING EUROOPA LIIDU TOETUSTE JA VÄLISABI AUDITEERIMINE
Sari
10-5 Riigieelarve ja välisvahendite auditi lõpparuanded koos tõendusmaterjali ja kirjavahetusega
Toimik
10-5/2021
Vastutaja
Mart Pechter (Rahandusministeerium, Kantsleri vastutusvaldkond, Finantskontrolli osakond)

Failid

  • 📎10-54934-1 29.06.2021 Väljaminev kiri.asice588 KB

Sisu (failidest)

Estonia-Russia CBC Programme 2014-2020 Audit of Financial Control function Audit No JKS-39/2020 Final Report 29.06.2021 Prepared by the Audit Authority of Estonia-Russia Programme Audit of management and control systems – Final Report Audit final report recipients: Ms. Imbi Uusjärv, Head of the Financial Control function Ms. Ege Ello, Head of the Managing Authority Ms. Unda Ozolina, Head of the Joint Technical Secretariat EXECUTIVE SUMMARY The purpose of this audit was to assess the effectiveness of the management and control systems of Estonia-Russia CBC Programme 2014-2020 in administrating the Financial Control function of the Programme. The assessment was carried out based on the following: • Key requirement 1: Adequate separation of functions and adequate systems for reporting and monitoring where the responsible authority entrusts execution of tasks to another body. • Key requirement 3: Adequate information to beneficiaries. • Key requirement 4: Adequate management verifications. • Key requirement 5: Effective system in place to ensure that all documents regarding expenditure and audits are held to ensure an adequate audit trail. • Key requirement 6: Reliable system for collecting, recording and storing data for monitoring, evaluation, financial management, verification and audit purposes, including links with electronic data exchange systems with beneficiaries. • Key requirement 7: Effective implementation of proportionate anti-fraud measures. By compiling the audit opinion, the auditors considered the evidence gathered and conclusions made during the audit work. SUMMARY OF THE AUDIT RESULTS As the result of this audit, the Audit Authority is in opinion that the management and control systems of the Estonia-Russia Programme in respect of the Key requirements 1, 3, 4, 5, 6 and 7 works, but some improvements are needed (Category 21). The detailed results by assessment criteria are presented in Part B of this report and the summary table of results in Annex 1. During the audit, the following significant2 findings were made: Finding No 4.1 - The general four-eye principle in relation to the Financial Control function in Russian Federation is not assured in practice (Significant) Finding No 4.2 - The control of the Managing Authority in relation to the Financial Control function is not well defined in procedure and practice (Significant) 1 Category 1 – Works well. No or only minor improvements needed Category 2 - Works, but some improvements are needed Category 3 – Works partially; substantial improvements are needed Category 4 – Essentially does not work. 2 Significant findings are findings that describe an error in the auditee’s management and control systems which has a significant effect on the possibility of fulfilling its critical tasks and requirements (this may include systemic errors). Significant findings require immediate action from the auditee’s management in order to correct those errors. Non-significant findings are findings that describe an error in the auditee’s management and control systems which has a non-significant effect on the possibility of fulfilling its critical tasks and requirements (this may include random errors). Non-significant findings require action from the auditee’s management in order to correct those errors. 2 Audit of management and control systems – Final Report Finding No 4.3 - The division of horizontal control topics between the Financial Control function and the Joint Technical Secretariat should be clarified (Significant) The auditors assume that the information presented to them during the audit including both in written and verbal form describe the management and control systems of the Estonia-Russia Programme correctly and in accordance with its actuality. Should there exist information that was not known or not presented to the auditors at the time, the results and the opinion may have been different. The audit has been carried out in accordance with internationally accepted internal auditing standards of the IIA – International Standards for the Professional Practice of Internal Auditing. The final audit report will be published at the homepage of the Ministry of Finance of the Republic of Estonia. The audit team wishes to thank the employees of the Estonia-Russia Programme for their cooperation and assistance during the audit work. Final Report consists of 12 pages and an annex. Audit supervisor: Audit manager: (Signed electronically) (Signed electronically) Kadi Peets Mart Pechter Head of Audit Unit II Advisor Financial Control Department Financial Control Department 3 Audit of management and control systems – Final Report TABLE OF CONTENTS EXECUTIVE SUMMARY .......................................................................................................................................... 2 TABLE OF CONTENTS ............................................................................................................................................ 4 PART A .................................................................................................................................................................. 5 1. SUMMARY OF THE AUDIT WORK ................................................................................................................ 5 2. SAMPLING METHODOLOGY ...................................................................................................................... 5 3. BACKGROUND INFORMATION.................................................................................................................... 6 4. FOLLOW-UP AND MONITORING ................................................................................................................. 6 PART B .................................................................................................................................................................. 7 FINDINGS AND RECOMMENDATIONS ..................................................................................................... 7 Finding No 1.1 - The Description of management and control system should be updated (Non-significant) ........ 7 Finding No 4.1 - The general four-eye principle in relation to the Financial Control function in Russian Federation is not assured in practice (Significant) .................................................................................................................. 8 Finding No 4.2 - The control of the Managing Authority in relation to the Financial Control function is not well defined in procedure and practice (Significant) ..................................................................................................... 9 Finding No 4.3 - The division of horizontal control topics between the Financial Control function and the Joint Technical Secretariat should be clarified (Significant) ........................................................................................ 10 Finding No 4.4 - The principles of commenting on the Financial Control function checklist should be clarified (Non-significant).................................................................................................................................................. 11 Finding No 6.1 - The checklists of the Joint Technical Secretariat should be added to the section “Attachments JTS” under the Project Progress Report section in the eMS system (Non-significant) ....... Tõrge! Järjehoidjat pole määratletud. ANNEX 1 – SUMMARY OPINION OF THE AUDITEE’S MANAGEMENT AND CONTROL SYSTEMS .................................... 13 4 Audit of management and control systems – Final Report PART A 1. Summary of the audit work In accordance with the Agreement on financing and implementation of Cross-Border Cooperation Programme “Estonia-Russia” 2014-2020 and the working plan of the Audit Authority for the year 2020, the Audit Authority carried out an audit on the management and control systems of Estonia-Russia Programme in administrating the Financial Control function of the Programme, as used for the programming period of 2014-2020. The purpose of the audit was to give an independent opinion on the functioning and effectiveness of the management and control systems in that regard. The audit was carried out between 17/07/2020 and 29/06/2021. The audit was managed, and the audit procedures carried out by an Advisor of the Financial Control Department of the Ministry of Finance of Estonia, Mart Pechter. The audit supervisor was the Head of Audit Unit II of the Financial Control Department, Kadi Peets. To present an opinion, the management and control systems of Estonia-Russia Programme with regards to Financial Control function were analyzed and tested in accordance with the Key requirements 1, 3, 4, 5, 6 and 7. The audit was based on the following documents: - Joint Operational Programme document of Estonia-Russia Programme. - Description of the management and control systems of the Estonia-Russia Programme. - Methodologies and specific documents related to those documents developed and used by the Financial Control function and the Joint Technical Secretariat, such as the forms, checklists and guiding materials. - Selected partner report forms and the checklists and decisions pertaining to those forms. To form an opinion, the following audit procedures were carried out: - The evaluation of compliance of the Financial Control function set out in the documents of Estonia-Russia Programme in comparison with the Key requirements 1, 3, 4, 5, 6 and 7. - Testing in the practice of the Estonia-Russia Programme in the Financial Control function by selecting several partner report forms and the checklists and decisions for observation of the practice. - Conducting interviews with a controller of the Financial Control function, the Head of the Managing Authority, the Head of the Joint Technical Secretariat and the Head of the Financial Control function, among others. The audit work was based on the methodology developed by the Financial Control Department for the period of 2014- 2020. 2. Sampling methodology To test for the practice, different partner report forms were selected for testing as follows: - The selection was made from partner report forms entered to the eMs system of Estonia-Russia Programme. The selection was made randomly; with a few provisions as follows: o Selections were made from different objectives of the Programme, with two projects selected randomly from the TO1, two from the TO5 and one from the TO6. o The selection also included a variety of projects: one Large Infrastructure Project, two from the 1st Open Call, one from the 2nd Open Call and one from the 3rd Open Call. - The random selection was stopped after selecting those five random items from the population. The auditor believed these items provide sufficient coverage and variety with regards to the population. 5 Audit of management and control systems – Final Report - Out of those five random projects, ten random partners were selected for testing, with the provision that for every project, one Estonian partner and one Russian partner should be selected. In total, as mentioned before, five unique projects were appraised, which means that 10 partners in total were tested, regarding the checklists filled and final decisions made. The auditor again considers this sample to be sufficient for the purposes of this audit. 3. Background information In accordance with Agreement on financing and implementation of Cross-Border Cooperation Programme “Estonia- Russia” 2014-2020, the Audit Authority ensures that audits are carried out on the management and control systems of the Estonia-Russia Programme. The audit of the Financial Control function was added to the working plan of the Audit Authority because as per the risk assessment, it was deemed to be one of the more critical functions of the Estonia-Russia Programme and thus one of the firsts that should be audited. 4. Follow-up and monitoring The auditee must take into consideration all the findings and recommendations presented in the Part B of this report. The Managing Authority is responsible for the follow-up and monitoring of the implementation of measures taken as a result and will report of the results in a written form. The final opinion on the implementation of measures will be given by the Audit Authority. If necessary, a follow-up audit may be conducted. 6 Audit of management and control systems – Final Report PART B FINDINGS AND RECOMMENDATIONS3 Key requirement 1: Adequate separation of functions and adequate systems for reporting and monitoring where the responsible authority entrusts execution of tasks to another body As the result of this audit, the auditor finds that the management and control system of the Estonia-Russia Programme of this function regarded via the Key Requirement 1 works well. Only minor improvements needed (Category 1) 4 Finding No 1.1 - The Description of management and control system should be updated (Non- significant) The TESIM project has published a working paper adaption on the Methodology for assessing management and control systems, published by the European Commission, detailing the key requirements and assessment criteria for the management and control system audits. In accordance with the Key requirement 1.1, there should be a clear description and allocation of functions. The auditor finds that some minor information in the Description of management and control systems should be updated to better reflect the practice of the Programme. For instance, the following updates should be useful: • Updating the chart of Control Contact Point in Republic of Estonia by noting the full- or part-time employment of both the CCP and the public officers. • Clearly state that the four-eye principle on the work of the Financial Control function is carried out by the Control Contact Point in Republic of Estonia and contracted out in Russian Federation. • Update the chart of the examination and verification process by including the four-eye principle in the process. • Update that the Financial Control check has been decided to now take 40 days instead of 60. • Update the information of Control Contact Point in Russian Federation by clarifying the tasks that are carried out in practice. RISK: The auditor points out that although minor, the risk of leaving the points not clarified may affect the confidence in the description and function of the system. RECOMMENDATION No 1.1 TO THE MANAGING AUTHORITY: The auditor recommends updating the Description of management and control systems with the necessary information. COMMENT FROM THE MANAGING AUTHORITY The Managing Authority has already updated the Description of Management and Control Systems, some additional updates according to the Auditor’s recommendations will be made. The Managing Authority will carry out a written procedure of the Joint Monitoring Committee for approval of the updated document from 1 July to 22 July 2021. FINAL COMMENT FROM THE AUDITOR 3 Audit findings are listed according to the assessment criteria of the management and control systems assessment methodology 4 Category 1 – Works well. No or only minor improvements needed Category 2 - Works, but some improvements are needed Category 3 – Works partially; substantial improvements are needed Category 4 – Essentially does not work. 7 Audit of management and control systems – Final Report The auditor accepts the comments and considers this finding closed. Key requirement 3: Adequate information to beneficiaries As the result of this audit, the auditor finds that the management and control system of the Estonia-Russia Programme of this function regarded via the Key Requirement 3 works well. No improvements needed (Category 1) 5 No findings. Key requirement 4: Adequate management verifications As the result of this audit, the auditor finds that the management and control system of the Estonia-Russia Programme of this function regarded via the Key Requirement 4 works, but some improvements are needed (Category 2) Finding No 4.1 - The general four-eye principle in relation to the Financial Control function in Russian Federation is not assured in practice (Significant) The TESIM project has published a working paper adaption on the Methodology for assessing management and control systems, published by the European Commission, detailing the key requirements and assessment criteria for the management and control system audits. The Key requirement 4.1 (a), administrative verifications in respect of each application for reimbursement by beneficiaries, states that all applications for reimbursement submitted by beneficiaries should be subject to administrative verifications by the Managing Authority before certification. As set out in the Description of management and control systems, the Financial Control function is carried out by public officers in Republic of Estonia and contracted auditors in Russian Federation. In Estonian side, the Control Contact Point checks the public officers’ work on sample basis. In Russian side, an auditor is contracted to check the work of auditors. The findings from this level of control are presented to the Managing Authority for decisions. However, the auditor notes that this additional contracting has not yet been carried out, although the verifications by the contracted auditors have been and are being carried out. This means that the so-called four-eye principle is not currently functional. The Managing Authority has stated that this situation will be amended as soon as possible. RISK: The auditor points out that there is no other function carrying out checks on the work of the Financial Control function. The checks of Joint Technical Secretariat and Certifying Authority function, although necessary, have other purposes of their own. Therefore, any errors on the Financial Control function level in Russian Federation (either random or systemic) have a risk of not getting noticed. RECOMMENDATION No 4.1 TO THE MANAGING AUTHORITY: The auditor recommends carrying out the contracting process to ensure the function of the so-called four-eye principle in Russian Federation as soon as possible. The auditor also notes that to use outsourced resources more efficiently, this function need not be continuous as in 5 Category 1 – Works well. No or only minor improvements needed Category 2 - Works, but some improvements are needed Category 3 – Works partially; substantial improvements are needed Category 4 – Essentially does not work. 8 Audit of management and control systems – Final Report Republic of Estonia but can be periodic instead. This merely needs to be carried out before the Certifying Authority function. COMMENT FROM THE MANAGING AUTHORITY The Managing Authority and the Joint Technical Secretariat will launch a tender for contracting of sample-based check of the work of contracted auditors in the Russian Federation to ensure the so-called four-eye principle during the 2nd half of 2021. FINAL COMMENT FROM THE AUDITOR The auditor accepts the comments and will follow up on this finding by the time the proposed plan has been carried out. Finding No 4.2 - The control of the Managing Authority in relation to the Financial Control function is not well defined in procedure and practice (Significant) The TESIM project has published a working paper adaption on the Methodology for assessing management and control systems, published by the European Commission, detailing the key requirements and assessment criteria for the management and control system audits. The Key requirement 4.1 (a), administrative verifications in respect of each application for reimbursement by beneficiaries, states that all applications for reimbursement submitted by beneficiaries should be subject to administrative verifications by the Managing Authority before certification. As set out in the Description of management and control systems, the Managing Authority has a control function in relation to the Financial Control function. When the partners’ reports have passed the Financial Control function and the consolidated report is prepared and checked by the Joint Technical Secretariat, the Managing Authority will check the results in turn, using a checklist developed for that purpose. However, the auditor notes that the Managing Authority does not carry out this control quite as written, nor has there been a checklist developed for that. Instead, as the Managing Authority states, its control function is carried out as based on risk evaluation (dependent on the information from the Financial Control and Joint Technical Secretariat). Any items with no specific risk attached are not checked. RISK: The auditor points out that there is a small but significant difference on how this control is described and how it is carried out in practice. If there is no random element in the control, it is apparent that this check will be carried out only on narrow selection of items. There is a risk that the current description gives misleading information about the nature of this control. Still, the auditor concedes that the risk is not inherent to the practice as such, only to the difference between description and practice. RECOMMENDATION No 4.2 TO THE MANAGING AUTHORITY: The auditor recommends updating the description of the procedure to match that of the practice. The auditor also recommends updating the procedures whenever something more suitable to the function is found in practice. COMMENT FROM THE MANAGING AUTHORITY The Managing Authority has updated the Description of Management and Control Systems already and will carry out a written procedure of the Joint Monitoring Committee for approval of the updated document from 1 July to 22 July 2021. The Managing Authority will follow the recommendation of the Auditor on updating the procedures whenever something more suitable to the function is found in practice. FINAL COMMENT FROM THE AUDITOR The auditor accepts the comments and will follow up on this finding by the time the proposed plan has been carried out. 9 Audit of management and control systems – Final Report Finding No 4.3 - The division of horizontal control topics between the Financial Control function and the Joint Technical Secretariat should be clarified (Significant) The TESIM project has published a working paper adaption on the Methodology for assessing management and control systems, published by the European Commission, detailing the key requirements and assessment criteria for the management and control system audits. The Key requirement 4.3 states that written procedures and comprehensive checklists should exist to be used and should, as a minimum, address verifications on: e. compliance with the relevant rules on environment, sustainable development, equal opportunity requirements and non-discrimination. f. the reality of the project, including the output and result indicators. Currently, there is a division of checks between the Financial Control function and the Joint Technical Secretariat, with different points of focus. The Financial Control function focuses on eligibility of specific costs and the Joint Technical Secretariat on horizontal topics. The auditor notes that the checklist of the Joint Technical Secretariat does not include a control question for the horizontal topics: environment, sustainable development, equal opportunity requirements and non-discrimination. The checklist also does not have a separate control question for the indicators. The auditor concedes that in practice, both the Financial Control function and the Joint Technical Secretariat have agreed on the division of the topics and are aware of what the extent of the checks for both are. RISK: The auditor points out that although a current division of tasks is reasonable in theory, the risk is that some topics will not end up covered if the division is not clear enough. RECOMMENDATION No 4.3 TO THE JOINT TECHNICAL SECRETARIAT: The auditor recommends updating the checklists of the Joint Technical Secretariat, by adding control questions about the environment, sustainable development, equal opportunity requirements, non-discrimination and indicators. COMMENT FROM THE JOINT TECHNICAL SECRETARIAT The Joint Technical Secretariat would like to add an explanation that horizontal principles such as sustainable development (environment), equal opportunity requirements, non-discrimination and HIV prevention are incorporated in the application by default and automatically appear as a mandatory section in each progress report. The JTS verifies the completion of the report for every section regardless of whether it is separated in the checklist or not. In future the checklists of the Joint Technical Secretariat will be elaborated and questions about the environment, sustainable development, equal opportunity requirements, non-discrimination and indicators will be added. It is planned to be carried out in July of 2021. In addition, after interview with Audit Authority during the audit, the question of environment, sustainable development, equal opportunity requirements and non-discrimination also was asked in some on-spot visits and reflected in the on-spot reports. This practice is going to be continued. FINAL COMMENT FROM THE AUDITOR The auditor accepts the comments and will follow up on this finding by the time the proposed plan has been carried out. 10 Audit of management and control systems – Final Report Finding No 4.4 - The principles of commenting on the Financial Control function checklist should be clarified (Non-significant) The TESIM project has published a working paper adaption on the Methodology for assessing management and control systems, published by the European Commission, detailing the key requirements and assessment criteria for the management and control system audits. The Key requirement 4.3 states that written procedures and comprehensive checklists should exist to be used for the management verifications to detect any material misstatements. Currently, there is a comprehensive checklist used by the Financial Control function to assess the reports presented by the partners. However, the auditor notes that there is no clear policy of commenting on that checklist that is set for both the public officers in Republic of Estonia and contracted auditors in Russian Federation. Therefore, the amount and detail of comments added to the checklist by them varies, especially concerning the contracted auditors, since their number is larger. RISK: The auditor points out that if there is no clear policy of commenting on the checklist, the amount of information in each checklist will be varied. There is a risk that this will affect the checks of the other Programme bodies (such as the Managing Authority and the Certifying Authority function) that may want to use that information in their own work. RECOMMENDATION No 4.4 TO THE FINANCIAL CONTROL FUNCTION: The auditor recommends stating a clear policy on commenting on the checklist used by the Financial Control function to assess the reports presented by the partners. This policy should also be communicated to the contracted auditors in Russian Federation. COMMENT FROM THE FINANCIAL CONTROL FUNCTION The Financial Control function has agreed to fill the comment section in case there were problems with the cost – the cost is (partially) ineligible or needed significant additional information to check. Since it is not described in our procedure, we will add the explanation in the partner report control part during the change of our procedures. COMMENT FROM THE MANAGING AUTHORITY The Managing Authority finds the Auditor’s recommendation useful, but it might be difficult to set a clear policy for commenting the checklist, and to implement it. However, the Managing Authority is open to the discussions about the practice and proposals of the Estonian Financial Control function. Also, if applied on the programme level to both participating countries, the policy must be approved by the Joint Monitoring Committee. FINAL COMMENT FROM THE AUDITOR The auditor accepts the comments and will follow up on this finding by the time the proposed plan has been carried out. Key requirement 5: Effective system in place to ensure that all documents regarding expenditure and audits are held to ensure an adequate audit trail As the result of this audit, the auditor finds that the management and control system of the Estonia-Russia Programme of this function regarded via the Key Requirement 5 works well. No improvements needed (Category 1) 6 6 Category 1 – Works well. No or only minor improvements needed Category 2 - Works, but some improvements are needed Category 3 – Works partially; substantial improvements are needed 11 Audit of management and control systems – Final Report No findings. Key requirement 6: Reliable system for collecting, recording and storing data for monitoring, evaluation, financial management, verification and audit purposes, including links with electronic data exchange systems with beneficiaries As the result of this audit, the auditor finds that the management and control system of the Estonia-Russia Programme of this function regarded via the Key Requirement 6 works well. No improvements needed (Category 1) 7 No findings. Key requirement 7: Effective implementation of proportionate anti-fraud measures As the result of this audit, the auditor finds that the management and control system of the Estonia-Russia Programme of this function regarded via the Key Requirement 7 works well. No improvements needed (Category 1) 8 No findings. Category 4 – Essentially does not work. 7 Category 1 – Works well. No or only minor improvements needed Category 2 - Works, but some improvements are needed Category 3 – Works partially; substantial improvements are needed Category 4 – Essentially does not work. 8 Category 1 – Works well. No or only minor improvements needed Category 2 - Works, but some improvements are needed Category 3 – Works partially; substantial improvements are needed Category 4 – Essentially does not work. 12 Audit of management and control systems – Final Report ANNEX 1 – Summary opinion of the auditee’s management and control systems Key requirement Category 1 Category 2 Category 3 Category 4 Key requirement 1: Adequate separation of functions and adequate systems for reporting and monitoring where the responsible X authority entrusts execution of tasks to another body Key requirement 3: Adequate information to beneficiaries X Key requirement 4: Adequate management verifications X Key requirement 5: Effective system in place to ensure that all documents are held to X ensure an adequate audit trail Key requirement 6: Reliable system for collecting, recording and storing data for monitoring, evaluation, financial management, X verification and audit purposes, including links with electronic data exchange systems with beneficiaries Key requirement 7: Effective implementation X of proportionate anti-fraud measures Summary opinion of the auditee’s X management and control systems 13 Pr Ege Ello Riigi Tugiteenuste Keskus Meie 29.06.2021 nr 10-5/4934-1 [email protected] Süsteemiauditi lõpparuande edastamine Austatud pr Ello Edastame Teile Cross-Border Cooperation Programme “Estonia-Russia” 2014-2020 juhtimis- ja kontrollisüsteemi auditi lõpparuande nr JKS-39/2020. Täname Teid auditi toimingute jooksul üles näidatud koostöö ja abi eest. Lugupidamisega (allkirjastatud digitaalselt) Kaur Siruli Finantskontrolli osakonna juhataja Lisa: Süsteemiauditi lõpparuanne kolmeteistkümnel (13) leheküljel Pr Imbi Uusjärv, Riigi Tugiteenuste Keskus ([email protected]) Pr Unda Ozolina, Riigi Tugiteenuste Keskus ([email protected]) Mart Pechter 611 3152 [email protected] Suur-Ameerika 1 / 10122 Tallinn / 611 3558 / [email protected] / www.rahandusministeerium.ee registrikood 70000272
Allikas: Rahandusministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel