dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Majandus- ja Kommunikatsiooniministeerium
Väljaminev kiriAvalik

kiri

Majandus- ja Kommunikatsiooniministeerium · 23. juuli 2019
Viit
17-7/2019/5616
Registreeritud
23. juuli 2019
Dokumendi liik
Väljaminev kiri
Adressaat
Directorate-General for Competition, European Commission
Saabumis/saatmisviis
e-post
Funktsioon
17 Energeetikaalase tegevuse korraldamine
Sari
17-7 Taastuvenergiaga seotud kirjavahetus
Toimik
17-7/2019
Vastutaja
Rein Vaks (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Energeetika valdkond, Energeetikaosakond)

Failid

  • 📎17-720195616 23.07.2019 Väljaminev kiri.bdoc300 KB
  • 📎Request for clarity concerning decision No SA.47354.pdf315 KB

Sisu (failidest)

Mr. LessenichLessenich Our 23.07.2019 nr 17-7/2019/5616 Head of Unit B3 for State Aid Directorate-General for Competition, European Commission [email protected] Place Madou, Madouplein 1 1210 Saint-Josse-ten-Noode/Sint-Joost- ten-Noode Request for Clarity concerning decision No SA.47354 (2017/NN) Dear Mr. Lessenich, On the 6th of December 2017, the European Commission decided not to rise objections to the state aid measures notified by Estonia on the 10th of November 2017 (Decision no SA.47354). After the transposition of the decision into national law, there have been some practical issues that cannot be resolved without some further clarification from DG COMP. therefore, we would appreciate to receive some additional clarity as to the interpretation of the descriptive parts of the State aid permitting decision SA.47354. Namely, paragraph 42 of the state aid Decision provides the following: “In practice, this means that the granting authorities should consider as “existing producer” those producers whose project on 1 January 2017 was in such state of development that it would very likely be completed so that they should receive support under the existing support scheme (legitimate expectations). This requires as a minimum that the project developers had obtained the necessary state authorization for constructing the project, and that they had the legal title to the land on which the project would be developed.” The relevant decision refers to, and is based on, the European Commission Guidelines on State Aid for Environmental Protection and Energy (EEAG), which state in paragraph 19(44) that ‘start of works’ means either (i) the start of construction works on the investment or (ii) the first firm commitment to order equipment or (iii) other commitment that makes the investment irreversible, whichever is the first in time. Moreover, according to the EEAG, buying of land and preparatory works such as obtaining permits and conducting preliminary feasibility studies are not considered as start of works. The Ministry has always understood that the EEAG does not require a state authorization for construction as a general prerequisite. Likewise, we’ve understood that it derives clearly from the wording of the EEAG that it is not necessary for the ‘start of works’ to occur that any construction Suur-Ameerika 1 / 10122 Tallinn / 625 6342 / [email protected] / www.mkm.ee Registrikood 70003158 works have started, since the ‘start of construction works’ is only one of the three alternatives. Any other interpretation would make two of the three alternatives set out in paragraph 19(44) meaningless. Moreover, from our earlier correspondence we have gathered that the purpose of paragraph 42 of the state aid permit is only to state that if the ‘start of works’ is argued on the basis of the ‘start of construction works’ then the construction works can be considered to be started only if those works were legal under the national legislation. However, for the sake of clarity, we would appreciate it if you could confirm the correctness of our understanding above, i.e. the existence of an authorization for constructing the project as referenced in paragraph 42 of SA.47354 cannot constitute an obligatory prerequisite for the ‘start of works’, i.e. an investment may be considered as irreversible even without an authorization for constructing the project. Respectfully, (signed digitally) Jaanus Uiga Director of the Energy Department Rein Vaks 6256347 [email protected] 2 (2) Mr. LessenichLessenich Our 23.07.2019 nr 17-7/2019/5616 Head of Unit B3 for State Aid Directorate-General for Competition, European Commission [email protected] Place Madou, Madouplein 1 1210 Saint-Josse-ten-Noode/Sint-Joost- ten-Noode Request for Clarity concerning decision No SA.47354 (2017/NN) Dear Mr. Lessenich, On the 6th of December 2017, the European Commission decided not to rise objections to the state aid measures notified by Estonia on the 10th of November 2017 (Decision no SA.47354). After the transposition of the decision into national law, there have been some practical issues that cannot be resolved without some further clarification from DG COMP. therefore, we would appreciate to receive some additional clarity as to the interpretation of the descriptive parts of the State aid permitting decision SA.47354. Namely, paragraph 42 of the state aid Decision provides the following: “In practice, this means that the granting authorities should consider as “existing producer” those producers whose project on 1 January 2017 was in such state of development that it would very likely be completed so that they should receive support under the existing support scheme (legitimate expectations). This requires as a minimum that the project developers had obtained the necessary state authorization for constructing the project, and that they had the legal title to the land on which the project would be developed.” The relevant decision refers to, and is based on, the European Commission Guidelines on State Aid for Environmental Protection and Energy (EEAG), which state in paragraph 19(44) that ‘start of works’ means either (i) the start of construction works on the investment or (ii) the first firm commitment to order equipment or (iii) other commitment that makes the investment irreversible, whichever is the first in time. Moreover, according to the EEAG, buying of land and preparatory works such as obtaining permits and conducting preliminary feasibility studies are not considered as start of works. The Ministry has always understood that the EEAG does not require a state authorization for construction as a general prerequisite. Likewise, we’ve understood that it derives clearly from the wording of the EEAG that it is not necessary for the ‘start of works’ to occur that any construction Suur-Ameerika 1 / 10122 Tallinn / 625 6342 / [email protected] / www.mkm.ee Registrikood 70003158 works have started, since the ‘start of construction works’ is only one of the three alternatives. Any other interpretation would make two of the three alternatives set out in paragraph 19(44) meaningless. Moreover, from our earlier correspondence we have gathered that the purpose of paragraph 42 of the state aid permit is only to state that if the ‘start of works’ is argued on the basis of the ‘start of construction works’ then the construction works can be considered to be started only if those works were legal under the national legislation. However, for the sake of clarity, we would appreciate it if you could confirm the correctness of our understanding above, i.e. the existence of an authorization for constructing the project as referenced in paragraph 42 of SA.47354 cannot constitute an obligatory prerequisite for the ‘start of works’, i.e. an investment may be considered as irreversible even without an authorization for constructing the project. Respectfully, (signed digitally) Jaanus Uiga Director of the Energy Department Rein Vaks 6256347 [email protected] 2 (2)
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel