Mr. LessenichLessenich Our 23.07.2019 nr 17-7/2019/5616
Head of Unit B3 for State Aid
Directorate-General for Competition,
European Commission
[email protected]
Place Madou, Madouplein 1
1210 Saint-Josse-ten-Noode/Sint-Joost-
ten-Noode
Request for Clarity concerning decision No
SA.47354 (2017/NN)
Dear Mr. Lessenich,
On the 6th of December 2017, the European Commission decided not to rise objections to the state
aid measures notified by Estonia on the 10th of November 2017 (Decision no SA.47354). After the
transposition of the decision into national law, there have been some practical issues that cannot
be resolved without some further clarification from DG COMP. therefore, we would appreciate to
receive some additional clarity as to the interpretation of the descriptive parts of the State aid
permitting decision SA.47354.
Namely, paragraph 42 of the state aid Decision provides the following: “In practice, this means
that the granting authorities should consider as “existing producer” those producers whose
project on 1 January 2017 was in such state of development that it would very likely be completed
so that they should receive support under the existing support scheme (legitimate expectations).
This requires as a minimum that the project developers had obtained the necessary state
authorization for constructing the project, and that they had the legal title to the land on which the
project would be developed.”
The relevant decision refers to, and is based on, the European Commission Guidelines on State
Aid for Environmental Protection and Energy (EEAG), which state in paragraph 19(44) that ‘start
of works’ means either (i) the start of construction works on the investment or (ii) the first firm
commitment to order equipment or (iii) other commitment that makes the investment irreversible,
whichever is the first in time. Moreover, according to the EEAG, buying of land and preparatory
works such as obtaining permits and conducting preliminary feasibility studies are not considered
as start of works.
The Ministry has always understood that the EEAG does not require a state authorization for
construction as a general prerequisite. Likewise, we’ve understood that it derives clearly from the
wording of the EEAG that it is not necessary for the ‘start of works’ to occur that any construction
Suur-Ameerika 1 / 10122 Tallinn / 625 6342 /
[email protected] / www.mkm.ee
Registrikood 70003158
works have started, since the ‘start of construction works’ is only one of the three alternatives. Any
other interpretation would make two of the three alternatives set out in paragraph 19(44)
meaningless. Moreover, from our earlier correspondence we have gathered that the purpose of
paragraph 42 of the state aid permit is only to state that if the ‘start of works’ is argued on the basis
of the ‘start of construction works’ then the construction works can be considered to be started
only if those works were legal under the national legislation.
However, for the sake of clarity, we would appreciate it if you could confirm the correctness of
our understanding above, i.e. the existence of an authorization for constructing the project as
referenced in paragraph 42 of SA.47354 cannot constitute an obligatory prerequisite for the ‘start
of works’, i.e. an investment may be considered as irreversible even without an authorization for
constructing the project.
Respectfully,
(signed digitally)
Jaanus Uiga
Director of the Energy Department
Rein Vaks
6256347
[email protected]
2 (2)
Mr. LessenichLessenich Our 23.07.2019 nr 17-7/2019/5616
Head of Unit B3 for State Aid
Directorate-General for Competition,
European Commission
[email protected]
Place Madou, Madouplein 1
1210 Saint-Josse-ten-Noode/Sint-Joost-
ten-Noode
Request for Clarity concerning decision No
SA.47354 (2017/NN)
Dear Mr. Lessenich,
On the 6th of December 2017, the European Commission decided not to rise objections to the state
aid measures notified by Estonia on the 10th of November 2017 (Decision no SA.47354). After the
transposition of the decision into national law, there have been some practical issues that cannot
be resolved without some further clarification from DG COMP. therefore, we would appreciate to
receive some additional clarity as to the interpretation of the descriptive parts of the State aid
permitting decision SA.47354.
Namely, paragraph 42 of the state aid Decision provides the following: “In practice, this means
that the granting authorities should consider as “existing producer” those producers whose
project on 1 January 2017 was in such state of development that it would very likely be completed
so that they should receive support under the existing support scheme (legitimate expectations).
This requires as a minimum that the project developers had obtained the necessary state
authorization for constructing the project, and that they had the legal title to the land on which the
project would be developed.”
The relevant decision refers to, and is based on, the European Commission Guidelines on State
Aid for Environmental Protection and Energy (EEAG), which state in paragraph 19(44) that ‘start
of works’ means either (i) the start of construction works on the investment or (ii) the first firm
commitment to order equipment or (iii) other commitment that makes the investment irreversible,
whichever is the first in time. Moreover, according to the EEAG, buying of land and preparatory
works such as obtaining permits and conducting preliminary feasibility studies are not considered
as start of works.
The Ministry has always understood that the EEAG does not require a state authorization for
construction as a general prerequisite. Likewise, we’ve understood that it derives clearly from the
wording of the EEAG that it is not necessary for the ‘start of works’ to occur that any construction
Suur-Ameerika 1 / 10122 Tallinn / 625 6342 /
[email protected] / www.mkm.ee
Registrikood 70003158
works have started, since the ‘start of construction works’ is only one of the three alternatives. Any
other interpretation would make two of the three alternatives set out in paragraph 19(44)
meaningless. Moreover, from our earlier correspondence we have gathered that the purpose of
paragraph 42 of the state aid permit is only to state that if the ‘start of works’ is argued on the basis
of the ‘start of construction works’ then the construction works can be considered to be started
only if those works were legal under the national legislation.
However, for the sake of clarity, we would appreciate it if you could confirm the correctness of
our understanding above, i.e. the existence of an authorization for constructing the project as
referenced in paragraph 42 of SA.47354 cannot constitute an obligatory prerequisite for the ‘start
of works’, i.e. an investment may be considered as irreversible even without an authorization for
constructing the project.
Respectfully,
(signed digitally)
Jaanus Uiga
Director of the Energy Department
Rein Vaks
6256347
[email protected]
2 (2)