9.2 VÄLISABI JA EUROOPA LIIDU TOETUSTE PROGRAMMIDE KORRALDAMINE
Sari
9.2-2 Ühtekuuluvusfondi programmiga seotud kirjavahetus (RO, FO)
Toimik
9.2-2/2021
Vastutaja
Kairi Nisamedtinov (Rahandusministeerium, Kantsleri vastutusvaldkond, Eelarvepoliitika, Riigieelarve osakond, Välisvahendite talitus)

Failid

  • 📎9.2-21073-1 09.02.2021 Väljaminev kiri.asice960 KB

Sisu (failidest)

Annex I Thank you for all comments made in the follow-up letter in December 2020. We share your concerns about the slow progress in some measures of 2014-2020 operational programme (OP), also regarding low achievements of some strategic goals. We can assure, that we started in co-operation with State Shared Service Centre (SSSC) close and intensive monitoring of OP, the detailed overview can be found below. What concerns to R&D spending and the reduction of the at-risk-of poverty rate after social transfers, we can confirm that these subjects are a government level priority in Estonia, also in implementing and planning structural funds. The COVID-crisis has had an impact on Estonian economy, also on labour market, but with joint efforts of line ministries and SSSC, we try to keep up the implementation phase and re-design measures, where necessary. We find that planning process of REACT-EU is in rather good state and we hope to address additional funds to the relevant measures as soon as possible. Regarding the planning of a period 2021-2027, we are on hold now (hopefully not for a long time), because of the change of the Estonian government. However, we are continuing with the plans and preparation of public consultation. We had to move planned events from February to March1, but it still leaves us time for consultations. Acceleration of period 2014-2020 During the autumn monitoring round of 2020, Ministry of Finance and SSSC met with Ministry of Economic Affairs and Communication, Ministry of Social Affairs, Ministry of Education and Research and with Ministry of Finance (regional policy unit). Ministries that had no problem with progress, like Ministry of Culture, Ministry of the Interior and Government Office, gave their input in writing. To prepare the meetings, Ministry of Finance (MoF) and SSSC looked thoroughly the progress of indicators towards the 2023 targets and financial implementation. We analysed the trends of payments, the state of projects (how many under the preparation, how many will end soon) and commitment level. The focus was on finding the bottlenecks of implementation, speeding up the payments and finding the funds uncommitted. We also compared the progress of different priority axes to give the picture on overall progress of the programme. The main conclusion of the meetings was that all ministries have planned their funds to be used at the absolute end of the period to avoid the financing gap between this and next programming period. COVID crisis definitely had an impact on implementation, but ministries and implementing agencies were flexible as possible and made different changes in legal acts and payments pace to answer the needs of beneficiaries. There are some sub-measures which cannot continue as before, because of the COVID virus. For example, free movement of foreign students and researchers is continually complicated because of travel restrictions. ESF interventions, which need direct contact, for example counselling of NEET’s, were on hold and there can be problem to reach 100% the 2023 targets, etc. Still, the conclusion was, concerning the implementation of structural funds, Estonia handled the situation quite well. Ministries and SSSC made action plan to accelerate the implementation and monitor the progress:  Speed up the payment process: SSSC is monitoring monthly the progress of payments, sends out reminders to applicants to submit the payment applications and solves as quickly as possible different disputes with the payments. Implementing agencies were asked to put more hands on consulting the project promoters and send out notices immediately, if the deadlines of reports are due date. It was also agreed, that implementing agencies must notify managing authority (SSSC), if there are any problems, which need a wider intervention. 1 https://www.struktuurifondid.ee/sites/default/files/sf21_kaasamise_plaan_veebi.pdf 1  More thorough preliminary inspection and pre-consultation of public procurement. It is already part of working progress, but still, sometimes drawbacks may occur. SSSC analyses the findings and makes the action plan in January 2021. The public checks on procurements are under the observation weekly.  More focused communication and pre-consultations about open calls and calls soon to be ended, motivating the potential beneficiaries.  If there any uncommitted recourses, ministries were asked to propose change of operational programme or redesign measures as soon as possible. In this point, the monitoring information of 2020 is crucial, to support the possible decisions and this information will be available after February 2021.  The sub-measures with commitment rate below 65% and payment rate below 50% are in special focus. These interventions will be under discussion again in March and if necessary, the available funds will be redistributed. All line ministries brought out, that they have some measures, where extra financing is needed. Due to the continuing unstable situation caused by the health crisis, MoF, SSSC and line ministries agreed to meet again in March – April 2021 to examine the progress in the light of monitoring data 2020. We are planning to begin with these meeting in the middle of March and the overview about the results of the meetings shall be in the Monitoring Committee agenda in May 2021. As outlined above, every line ministry has their measures where remaining amounts can be useful. Main principle is that the allocations should be concentrated, reasonably targeted and possible to implement during remaining programming period. Progress of commitments October 2020-January 2021 700 000 000 120% 600 000 000 100% 500 000 000 80% 400 000 000 60% 300 000 000 40% 200 000 000 100 000 000 20% 0 0% PA1 PA2 PA3 PA4 PA5 PA6 PA7 PA8 PA9 PA10 PA11 PA12 PA13 EU support Commited October 2020/EU Commited January 2021/EU October % January % Figure 1 Progress of commitments 2 Progress of payments October 2020-January 2021 700 000 000 90% 600 000 000 80% 70% 500 000 000 60% 400 000 000 50% 300 000 000 40% 30% 200 000 000 20% 100 000 000 10% 0 0% PA1 PA2 PA3 PA4 PA5 PA6 PA7 PA8 PA9 PA10 PA11 PA12 PA13 EU support Payments October 2020/EU Payments January 2021/EU October % January % Figure 2 Progress of payments Overview by priority axes (PA) It is important to note, that monitoring information is gathered and validated mostly in January and February, therefore in many priority axes and measures, the progress is not visible yet. In December and January, the submission of payment applications is also usually higher, and the amount of payments should increase. PA 1 Qualifications and skills meeting the needs of society and the labour market Ministry Education and Research made an agreement with the managing authority (SSSC), that information about problematic sub-measures and beneficiaries who do not submit payment applications on time, is forwarded timely to the ministry by MA. The problematic sub-measures are marked and will be assessed again in the March. ESF: Overall implementation is good. Some activities, like language teaching, were on hold during the lockdown, because the direct contact with pupils was essential. Still, the prognosis of reaching the targets is good and budget is expected to be used almost in full. ERDF: Under reorganization of the school network, the payment pace and reaching the targets could be higher. There are several reasons for lagging, firstly the negotiation with local governments took notably long time. Secondly, with added performance reserve, the budget was considerably increased, and a new project was planned (Tallinn School of Music and Ballet), so the movement towards final targets is rather moderate now. Although the timetable is tight, based on line ministry and implementing agency forecasts, the projects will be completed by the end of the period. There are problems with the performance of indicator Number of schools receiving support to integrate SEN pupils. The interest of schools to apply is lower than expected, approximately half of applications haven’t been submitted, especially in Ida-Virumaa. The first step agreed, was to inform schools more intensely about the end date of call for application to motivate them to apply. If there shall not be better results by summer of 2021, the terms to apply will be adjusted by the Ministry of Education and Research. If this step also shall not raise the interest of schools, the call shall be closed and unused envelope shall be used in some other measure of the PA. 3 Under some activities, the submission of payment application could be faster, and agreement was, that SSSC is keeping an eye on these cases quarterly. EU Payments in EU Payments in EU contribution September 2020 % January % 1.1.2. Development of career counselling services 3 323 010 1 508 068 45% 1 843 055 55% 1.3.2 Schools’ ICT infrastructure 11 065 187 4 160 308 38% 4 613 772 42% 1.4.1 Modernization of sustainable schools in the course of school network reorganization 274 656 112 85 091 135 31% 88 666 268 32% 1.4.2 Small solutions for the integration of SEN pupils in mainstream schools 7 994 250 414 436 5% 841 592 11% 1.5.5 Language learning activities for succeeding on the labour market 695 221 218 458 31% 253 095 36% Table 1 Activities with slower payments progress PA2 Increasing social inclusion Ministry of Social Affairs is keeping close contact with local governments to speed up implementation. The SSSC is focusing faster treatment of payments to avoid bottlenecks and delays. ESF: the picture is quite the same as under PA1/ESF, the phase of submission of the payment application should be higher and Ministry of Social Affairs and SSSC are closely monitoring the projects to assure the continuous payment flow. The activities targeted to the NEET’s were affected by COVID as direct contact with young people is required. These interventions are also under the close monitoring. ERDF: the implementation pace could be faster and agreement after the meeting was to make the controls over construction procurements the first priority of SSSC to keep the projects on schedule. PA3 Improvement of access to, and prevention of dropping out of, the labour market The performance of PA3 output indicators is satisfying, but financial implementation needs to be accelerated. During 2020, new large-scaled services were added to the PA3 activities, also new target group, people who are unemployed because the COVID-crisis. The pace of payments is being monitored quarterly in 2021. The end date of work-ability reform was extended to the end of 2021. If there should be any remaining funds, which is rather unlikely, the Ministry of Social Affairs would like to shuffle available amounts to the COVID-related intervention. EU Payments in EU Payments in EU contribution September 2020 % January % 3.2.1 Expanding labour market services to new 38 738 709 17 070 522 44% 18 586 479 48% target groups and providing new labour market services Table 2 Activity with slower payment progress 4 PA4 Growth-capable entrepreneurship and internationally competitive RD&I There are several sub-measures lagging with payments and reasons are different. Some calls were opened only recently or will be during 2021 and shall be implemented until to the end of programming period. For example, supporting the research infrastructure of national importance on the basis of the Road Map, applications were under evaluation in November-December 2020; state-funded cooperation structures (for example, for clusters and technology development centres) - applied research program opened at the end 2020. These activities are closely monitored, and both Managing Authority and Implementing Body are ready to help applicants with counselling and communication. As the timeframe is tight for project that have just started, the progress of projects is constantly monitored and in case of problems, there is still chance to move funds to other projects. Line ministry has already mapped the needs inside of PA4, for example, under the sub-measure identification of development needs and businesses development activities is ready to implement additional means. Under the specific objective making the structure of economy in Estonia more knowledge-intensive by means of smart specialisation, the achievement level of indicator the number of publications published by members of research groups in priority research directions is 0, although commitment is 100%. It takes time to write and publish scientific articles, it is planned to assess the state of articles at the end of 2021. Overall estimation of PA4 progress is positive; Managing Authority, and line ministries (Ministry of Education and Research and Ministry of Economic Affairs and Communication) are ready to react if there is any need for intervention. EU Payments in EU Payments in EU contribution September 2020 % January % 4.1.3 Internationalization of research and higher education; supporting mobility and offspring 57 759 090 27 857 861 48% 30 904 621 54% 4.2.1 Strengthening the sectoral research and development activities 25 954 351 10 839 438 42% 13 293 018 51% 4.2.3 R&D program for smart specialization in growth areas 34 395 241 12 339 882 36% 14 945 353 43% 4.2.4 State-funded cooperation structures (for example, for clusters and technology development centers) 73 096 664 30 980 249 42% 32 091 289 44% 4.2.5 Demand-side policies (the state as a client of innovative solutions) 6 562 799 1 199 541 18% 1 328 107 20% 4.4.1 Identification of development needs and businesses’ development activities 85 000 000 31 515 368 37% 34 868 350 41% 4.4.2 The part of research and development activity 10 000 000 4 950 928 50% 5 382 010 54% 4.5.1 Implementation of the research support measure of the IT Academy 10 200 000 1 249 786 12% 1 621 752 16% Table 3 Activities with slower payments progress 5 PA5 Development of small and medium-sized enterprises and strengthening the competitiveness of regions The COVID crisis interfered some activities under PA5, for example, foreign trade fares were cancelled, and the future is still vague. The application terms under aub-measure Increasing the demand for tourism were simplified to continue with projects despite of travelling restriction etc. The lowest progress is with industrial investments in Ida-Viru county, there is some interest but not many applicants. The volume of planned investments is high and after pre-counselling, some projects were cancelled, 5 projects are financed. The latest time to start with investments is third quarter of 2021. In March, the state of play will be assessed and if it necessary, the terms of application will be changed. Until then, the SSSC is continuing with counselling and helping the potential applicants. EU contribution Payments in September 2020 EU % Payments in January EU % 5.1.3 Export development activities 36 480 000 17 723 634 49% 18 402 296 50% 5.1.7 Development of tourism enterprises business models 10 036 600 611 888 6% 1 128 290 11% 5.4.5 Supporting industrial investments in Ida-Virumaa 6 200 000 0 0% 0 0% Table 4 Activities with slower payments progress PA6 Energy efficiency The progress of priority axes is satisfying. The lowest achievement is under sub-measure Supporting the production of biomethane and its consumption in the transport sector, but the application from city of Tallinn is approving the situation considerably (approved and the project starts in June 2021). EU contribution Payments in EU % Payments in EU % September 2020 January 6.4.1 Supporting the production of biomethane and 10 489 653 3 801 152 36% 4 641 509 44% its consumption in the transport sector Table 5 Activity with slower payments progress PA7 Water protection Under the sub-measure Construction and reconstruction of public water supply and sewerage systems, including drinking water treatment and wastewater treatment plants in public water supplies and wastewater collection areas the progress is improving but isn’t however satisfying. The implementing body, Environmental Investment Centre is monitoring the projects constantly and supports in every way. The measure Redevelopment of old A-category waste disposal sites still waits for the analysis how to continue with Kukruse hill, the next steps should be clear at the beginning of the 2021. If the solution is not to continue with Kukruse-project, Ministry of the Environment is ready to use possible available amounts inside PA after negotiations with the commission. Under the Organization of drained, exhausted and abandoned peatlands, the payments are made only at the end of projects, so there is still room for improvement of the progress. Payments in September Payments in EU contribution 2020 EU % January EU % 6 7.1.1 Construction and reconstruction of public water supply and sewerage systems 129 784 854 59 773 896 46% 75 582 120 58% 7.2.1 Redevelopment of old A-category waste disposal sites 1 262 250 123 204 10% 123 204 10% 7.2.2 Elimination of contaminated areas and hazardous buildings polluting the landscape and redevelopment of water bodies and their shore areas that are contaminated with hazardous substances 44 042 750 14 573 687 33% 23 100 756 52% 7.2.3 Organization of drained, exhausted and abandoned peatlands 4 930 000 1 288 990 26% 1 621 290 33% Table 6 Activities with slower payments progress PA8 Green infrastructure and improved preparedness for emergencies The pace of implementation is rather good, Ministry of the Environment proposed to meet again in April 2021, by this time the monitoring data is validated and possible needs of additional funding inside PA- s is clear. PA9 Sustainable urban development According the prognosis of Ministry of Finance (regional policy unit), most projects are on schedule, although there are delays with some Ida-Viru project procurements in sub-measure 9.2.2: Narva town hall square, Kohtla- Järve sporting hall. There is still time for implementing projects and there is a reserve list of eligible projects, if there will be any funds available. Payments in Payments in EU contribution September 2020 EU % January EU % 9.2.2 Activities for physical, economic and social recovery of under-utilized urban sites 19 100 000 5 570 972 29% 8 857 073 46% Table 7 Activity with slower payments progress PA10 Sustainable transport The progress is very good. PA 11 Infrastructure for ICT services The overall progress is good, under the sub-measure Development of basic infrastructure of services supporting the creation and implementation of e-services, projects are ongoing, whole budget is covered with investment plan. PA12 Administrative capacity The progress of ESF measures in general is good. With ERDF measures, the progress needs improvement. Under Building of public services interoperability, the pace of implementation could be faster, but in June 2020 the action plan for the 2020-2021 was confirmed and there is no indication that there will be any funds unused. In 2021 new call will be opened for the sub-measure Smart development (including analysis) of existing and new information systems. According to January data, 223 projects were already finished and 114 are ongoing. 7 Under the personal medicine activity, 2 million euros waited for action plan 2021-2022 to be confirmed. Ministry of Social Affairs is closely monitoring the progress, the payments are planned for the end of 2021 and beginning of 2022. EU contribution Payments in EU % Payments in EU % September 2020 January 12.3.1 Smart development (including analysis) of 102 210 907 37 188 214 36% 40 193 459 39% existing and new information systems 12.3.2 Building of public services interoperability 3 000 000 1 073 019 36% 1 118 483 37% 12.3.3 Development of personal medicine 4 250 000 433 980 10% 627 767 15% Table 8 The progress of PA12 ERDF payments PA13-14, Technical assistance As regards the financial progress of technical assistance, we see there no issues to be solved. The low commitment rate is the result of taking commitments up based on annual state budget planning process. Although the whole amount is planned to be used + REACT-EU additional envelope, the final committed amount shall clear only in 2023. Current planning of usage of TA funds (ERF, CF) in the state budget strategy process (1+3 years) does not show savings. The payment rate of TA funds is actually very desirable. We must not forget, that until September 2015, the TA means of last period were used in Estonia. The administration in comparison with the beginning of period, has been reduced considerably (in 2014 there were 429 FTE-s in TA payroll, in 2019 only 297 FTE-s) due to more efficient administration; consolidation processes taken place so far; shifting the source of salaries in MoF State Budget Department to national budgetary means; outsourcing of audits at some extent; and more wider and better usage of IT system. As from 1.01.2021, REACT-EU funds are added and in parallel 2021+ period shall start which we expect to finance until 31.12.2023 from this period TA funding, we expect TA payments to rise as well. What concerns TA result indicators, 2 out of 3 are met during past years, only public awareness is behind the target, but usually with opening of the new period, also more information campaigns take place and awareness might hopefully rise by 2023 to the expected level. The fulfilment of some output indicator targets has been rather modest so far, but we have asked the managing authority to check once again the principles of reporting and make sure all that needs to be counted shall be counted with 2020 AIR. • Number of officials in the structural funds administration co-financed by the technical assistance 2023 target up to 429 as explained, is not our target anymore, for 2023 more relevant would be around 330, we propose amending the OP. • Number of training and seminar days for implementing bodies and units 2023 target is 444, 2019 achievement level was 140 (31%), this year due to corona shall not bring much addition. Considerably lower interest and also supply are the result of rather low stuff turnover (2017- 7,2%, 2018-6,1%, 2019-10,6%), there is a considerable number of people who have worked within the Structural Funds implementation system for many-many years (including 2-3 periods), in addition, it is habitual to change job within the SF administration (between different bodies). So there has not been many new recruits to train regularly. Most ministries and other involved bodies have their own in-house thorough handover of works procedures in place. When Estonia held the EU Presidency, training of officials took part in that framework (and was not reported as SF training). Past years we have moved to more frequent but much shorter seminars (2-3 hours) for discussing things (including preparation of new SF period legislation and agreeing on changes) with ministries and implementing bodies, that have been a great success, but have not been also taken account here yet (in days). And we have loads of guidance documents for pretty much all areas of SF implementation + individual counselling by field 8 experts. Due to COVID-19 pandemic, probably next year shall also not bring much addition to the achievement level. Just to be safe, we shall check the reporting of all years as well to make sure all eligible trainings are counted. • Number of training days for the auditing institution 2023 target is 37, 2019 achievement level was 7,5 (20%). Here only training days for the majority of the department are counted, but the personnel of Auditing Authority is also quite stable and experienced and they usually participate in individual trainings/ seminars – in order to meet their standards, they need regular training, but they can choose the suitable training based on their individual skills. And those individual trainings are not counted here. We shall check the reporting and make sure 2020 AIR shall cover all that should be covered. • Number of training days for potential applicants, partners and beneficiaries 2023 target is 41, 2019 achievement 18 (44%). This we expect to meet at reasonable extent. Mostly training days for potential applicants etc. are offered by implementing bodies. • Number of assessments of the Operational Programme 2023 target is 28, 2019 achievement level is 15. We expect overachievement here by the end of the period. Today, 40 evaluations are listed, but there might be some changes as usual (some evaluations put together etc.). Estonia’s achievements in relation to R&D spending and the reduction of the at- risk-of poverty rate after social transfers. We can ensure, that both subjects are very important at the state level. The state budget has four main priorities for the year 2021: • Stay healthy (contributing to health), • helping those who need it most (social protection), • accelerating smart development (science) and • continue with investments to green and digital revolution. In the 2021 state budget strategy2 is highlighted, that the aim is to reduce the relative poverty to 15% by 2023. The government priority in this area, is well-being of older people and people with special needs. The tools for reaching this coal are: • Depending on the possibilities of the state budget, an extraordinary pension increase is considered. • Continuing with establishing service houses for seniors, to provide welfare services. • Bring up to date the long term care providing, to reduce the care burden of families, also provide the possibility for people with special needs to live independently as much, as possible. • Support the use of new technological solutions in social protection. • Improve the accessibility of the living environment across all areas. • Improve the accessibility to the health care and reduce the waiting list of health services. • Approve the Population Health Development Plan 2020-2030, which identifies important priorities for the next decade to improve people's health status, increase life expectancy and living a healthy life. • Continue with the Ida-Viru and South-Eastern Estonia programs. To support the knowledge-based economy, the Estonian government has decided to: 2 https://www.rahandusministeerium.ee/et/eesmargidtegevused/riigieelarve-ja-majandus/riigieelarve-ja- majandusulevaated 9 • Raise the government investments in R&D to 1% from GDP. For that, the government allocated additional 56 million euros in R&D. Ministry of Education and Research and Ministry of Economic Affairs and Communication are getting both 40% of this allocation and rest (20%) is addressed to other governmental administrations for strengthening R&D activities. • Support the researches in the COVID-19 field, also opening of laboratory with a third level of biosafety. • To raise private sector investment in R&D, new applied research programme is opened. • The new measure to find and support more industrial doctoral students etc. Regional disparities and changes in the labour market The aim of government regional programme3 is to provide accessible and rewarding positions, quality services and pleasant living environment in all Estonian counties. This year’s priority is to support the decentralization and change the financial policy of local governments. Also raise the capability of local governments with development programme, trainings and support measures. Important are also providing the measures which are directed for development of living and business areas. Ministry of Social Affairs has prioritised for 2021 several themes: • Comprise with unemployment insurance system more people, including self-employed. • Continue with developing measures for vulnerable groups of the labour market: elderly and young people, people with reduced capacity to work, people with low skills, including poor language skills. • Make the labour market services more effective and make changes in employment policy legislation. At the end of 2021 close study (financed from RITA programme) about pay-gap in Estonia will be finished. One aim of the study is to make analyse and suggestions for the government, how to ease the so far unexplained part of pay-gap. 3 https://www.rahandusministeerium.ee/et/regionaalareng-ja-poliitika 10 Angela Your ref. 23.12.2020 No Martinez Sarasola REGIO.DDG.D.5/H European Commission K(2020)8833174 regio-estonia-finland-latvia- Our ref. 09.02.2021 No 9.2-2/1073-1 [email protected] Follow-up of the Annual Review Meeting of 2 December 2020 concerning the Operational Programme for Cohesion Policy Funds 2014 -2020 in Estonia Dear Ms Angela Martinez Sarasola, Dear Ms Muriel Guin, Thank you very much for the fruitful Annual Review Meeting. According to the topics discussed at the meeting and to the follow-up letter you sent after the meeting, some issues require broader overview. We hereby send you a more detailed information about these topics. You will find the information in the Annex I in the following order: 1. Acceleration of period 2014-2020. 2. Overview by priority axes. 3. Estonia’s achievements in relation to R&D spending and the reduction of the at-risk- of poverty rate after social transfers. 4. Regional disparities and changes in the labour market. If you require any further information, please do not hesitate to contact us. Yours sincerely, (signed digitally) Sven Kirsipuu Deputy Secretary-General for Fiscal Policy Encl. Annex I Kairi Nisamedtinov +372 611 3096 [email protected] Suur-Ameerika 1 / 10122 Tallinn / Estonia / +372 611 3558 / [email protected] www.rahandusministeerium.ee / Reg. code: 70000272