Audit report form v.5
AUDIT OF OPERATION REPORT
Central Baltic INTERREG V A Cross-border Co-operation Programme 2014 – 2020
AUDIT NUMBER:
Date of audit report 20/01/2021
Contradictory procedure 11/01/2021 – 19/01/2021
Accounting period 01/07/2019 – 30/06/2020
Progress report No 3.1 in the amount of € 43 824.01
Audit scope
100%
Andreas Kalm (audit team member), Auditor of II Audit Unit Financial Control
Department of Ministry of Finance of Estonia Suur-Ameerika 1, 10129 Tallinn,
Estonia;
Hannes Vahemäe (audit manager), Auditor of I Audit Unit Financial Control
Auditor(s) Department of Ministry of Finance of Estonia Suur-Ameerika 1, 10129 Tallinn,
Estonia
Kadi Peets (audit superviso)r, Head of the II Audit Unit, Financial Control
Department of Ministry of Finance of Estonia Suur-Ameerika 1, 10129 Tallinn,
Estonia
Estonian Chamber of Commerce and Industry
Toom-Kooli 17, 10130 Tallinn
Audited organisation
Ms. Kaie Tropp
& contact information
Phone: +372 604 0093
Email:
[email protected]
Place of the audit Estonian Chamber of Commerce and Industry
Persons present during the audit Ms. Kaie Tropp
Date of on-the-spot checks Due to Covid-19 pandemic, the audit team didn’t do any checks on-the-spot.
Creation of export support co-operation network to China in Latvia-Estonia
Full project name
Finland cross-border region
Project Number & Acronym CB679 – LEF Network to China
Priority Axis 1. Competitive economy
Specific Objective SO 1.3 More exports by the Central Baltic companies to new markets
Reporting Period 01/04/2019 – 30/09/2019
Name of the Lead Partner Latvian Chamber of Commerce and Industry
Project duration
01/04/2018 – 31/03/2021
(start and end dates)
Based on the audit work performed we have obtained reasonable assurance that the
expenditure declared under the audited operation CB679 LEF Network to China
AUDIT within priority axis 1 in the reference year 2019/2020 is, in all material aspects,
CONCLUSION legal and regular.
The summarized list of findings identified during the audit is presented in the
following table and report.
Page 1
Audit report form v.5
Number
Total Financial Total Financial
of Nature of the finding(s)
Impact Impact ERDF
findings
1 N/A N/A The project has generated income during the reporting period 3.
No financial impact currently. (Major finding)
PART 1 – AUDIT SCOPE
According to Article 127 of Regulation (EU) No 1303/2013 the audit authority is responsible to carry out
audits of operations on the basis of supporting documents constituting the audit trail and verify the legality
and regularity of expenditure declared to the Commission, including the following aspects:
a) that the operation was selected in accordance with the selection criteria for the Operational
Programme, was not physically completed or fully implemented before the beneficiary submitted
the application for funding under the Operational Programme, has been implemented in accordance
with the approval decision and fulfilled any conditions applicable at the time of the audit concerning
its functionality, use, and objectives to be attained;
b) that the expenditure declared to the Commission corresponds to the accounting records and that
the required supporting documentation demonstrates an adequate audit trail;
c) that for expenditure declared to the Commission determined in accordance with Articles 67(1)(b)
and (c) and 109 of Regulation (EU) No 1303/2013 and Article 14(1) of Regulation (EU) No 1304/2013,
outputs and results underpinning payments to the beneficiary have been delivered, participant data
or other records related to outputs and results are consistent with the information submitted to the
Commission and that the required supporting documentation demonstrates an adequate audit trail.
PART 1.1 – LIMITATION OF SCOPE
The conclusions of the audit are based on the analysis of the procedure in place, information and documents
gathered and interviews conducted in the audited bodies as well as the tests performed in the course of the
audit following the checklist for the audit areas.
No on-the-spot checks were conducted during the audit due to the Covid-19 public health crisis of the year
2020. Despite that, the auditors have obtained sufficient assurance in other ways, no follow-up on-the-
spot checks are not necessary.
PART 1.2 – AUDIT METHODOLOGY
The audit is carried out in compliance with international accepted auditing standards and the audit strategy,
which is approved by the audit authority and group of auditors representing each Central Baltic INTERREG
VA Programme Member State.
The audit process comprises of three stages:
a) Preparation and planning of the audit
In this stage legal regulations and other documentation, including from the management verification
ex Regulation (EU) No 1299/2013, Article 23(4), needed for familiarising with the selected
operations were collected and analysed. Also, interviews or checklists which were needed for the
planning of the audit, familiarising with the functioning of the system, project files structure, the
objectives and the status of implementation of the operations, the risk encountered during the
implementation as well as those inherent to the type of operations.
Page 2
Audit report form v.5
b) Fieldwork
At this stage a whole range of interviews with responsible staff were conducted, documents were
gathered and testing was performed. In order to attain the audit objectives during the audit we
tested all applicable audit areas. We performed the audit using the checklists for the several audit
areas which enabled us to verify the requirements laid down in European and national legislation.
The assurance about the achievement of the project’s objectives was attained via documentation
uploaded to the programme’s information system (eMS), e-mail conversation with the project
partner and documents of the project outputs.
c) Reporting
This stage encompassed activities related to the preparation of the Draft Report and the
contradictory procedure where auditee has been granted 10 working days to reflect on the audit
report, the inclusion of their replies and comments and the submission of the Final Report.
Provide the actual schedule of the contradictory procedure as following
Preliminary report: 11/01/2021
Final report: 20/01/2021
PART 2 – FINANCIAL DATA OF OPERATION
Financial data of audited partner must be listed
PART 2.1 – BUDGET (€)
Audited Partners approved budget Granted in % Payments included %
total for the in the payment
partner claim
ERDF € 184 026.32 79.5% € 34 840.08 79.5%
Public funding (total) € 0.00 0% € 0.00 0%
Private funding € 47 453.34 20.5% € 8 983.92 20.5%
Income € 0.00 0% € 0.00 0%
TOTAL PARTNER BUDGET € 231 479.66 100% € 43 824.01 100%
Audited expenditure (according to the Sample)
Total amount audited Ineligible detected in
(combining audit scope
Budget Line milestones)
1. Staff costs € 7 598.35 € 0.00
2. Office and administration € 1 139.72 € 0.00
3. Travel and accommodation € 1 900.65 € 0.00
4. External expertise and services € 33 185.29 € 0.00
5. Equipment € 0.00 € 0.00
6. Infrastructure and works € 0.00 € 0.00
Total amount audited € 43 824.01 € 0.00
Audited expenditure (outside the Sample )
Total amount audited Ineligible
(combining
Budget Line milestones)
Page 3
Audit report form v.5
1. Staff costs € 0.00 € 0.00
2. Office and administration € 0.00 € 0.00
3. Travel and accommodation € 0.00 € 0.00
4. External expertise and services € 0.00 € 0.00
5. Equipment € 0.00 € 0.00
6. Infrastructure and works € 0.00 € 0.00
Total amount audited € 0.00 € 0.00
Page 4
Audit report form v.5
PART 3 – FINDINGS AND RECOMMENDATIONS
PART 3.1 GENERAL
During the audit we identify and document audit findings. We categorise these findings by reference to the
level of importance. The categories which we use to classify our findings are as follows:
Findings which have a financial impact above EUR 250 (ERDF) or any other high-
Major
risk deficiencies.
Findings for which action should be taken to ensure full compliance but have a
Minor limited financial impact (below EUR 250 (ERDF)), no financial consequences or
no high-risk character.
All audit findings are reported in the final audit report, even if the Member States participating in the
Programme may decide that neither the lead beneficiary nor the Programme's MA is obliged to recover an
amount unduly paid which does not exceed EUR 250, per operation and accounting year, not including
interest, in contribution from the Funds and the EMFF, as all the irregular amounts detected are to be taken
into account for the calculation of the annual Total Error Rate of the Programme.
PART 3.2 FINDINGS AND RECOMMENDATIONS PER BUDGET LINE
In this paragraph the findings and recommendations per audit area are included
Revenue generating projects
Audit Finding No. 1 – The project has generated income during the reporting period 3. No financial
impact currently (Major finding)
According to the Programme Manual: “All net revenue generated during project implementation shall
be reported in the Project Report. Where to report it and how it reduces the ERDF funding depends
on whether the net revenue was foreseen in the application phase or not.”
In the application, the project partner has not foreseen any revenue. In the audited period, the
beneficiary has organized two trainings (on 8th of May 2019 and 12th June 2019) for companies.
According to the trainings’ advertisements from the beneficiary’s website, everyone, who wanted
participate, had a chance to do that. Companies, who were not listed in the focus group of the project
(directly involved in achieving the project goals) had to pay participation fee, which for one training
was € 25 (+ VAT) and for the other one € 40 (+VAT) per participant. Companies that were already
involved in the project didn’t have to pay the fee.
According to the signed participants list, on the 8th of May 2019 training, there were at least 10
participants who were not involved in the project and who had to pay participation fee. For that
training, the fee was € 40 + VAT, so the earning from there was € 400. On the 12 th June 2019 training,
there were 25 participants who had to pay participation fee. For that training, the fee was € 25 + VAT,
so the earning from there was € 625. In total, the revenue for two trainings was € 1025.
In line with the CPR article 61 § 3:“The Commission shall be empowered to adopt delegated acts, in
accordance with Article 149, laying down the method referred to in point (b) of the first subparagraph.
Where that method is applied, the net revenue generated during implementation of the operation,
resulting from sources of revenue not taken into account in determining the potential net revenue of
the operation, shall be deducted from the eligible expenditure of the operation, no later than in the
final payment claim submitted by the beneficiary”
Page 5
Audit report form v.5
In auditors’ opinion, the project may deduct the collected net revenue not planned in the project
application until it’s last report and therefore there’s currently no financial impact. In addition, the
beneficiary should declare the income in the book-keeping system that’s related to the project.
According to the information in the eMS system, the First Level Control hasn’t detected (or at least,
there’s no audit trail that this question has arisen during the control) that during the period 3 the
auditee has generated income in the project.
Recommendations:
The auditee is recommended to gather the information about the income and deduct it no later than
in the final payment claim. Also the auditee is recommended to declare the income in the book-
keeping system that’s related to the project.
The MA is recommended to follow up the beneficiary’s activities to detect the potential income in this
project.
The FLC is recommended to pay more attention in the future to the potential revenue-generating
events to ensure that the project has not earned any income, which has not been reported with the
project’s reports. For that purpose, it is recommended to check also the announcements of projects’
events (for example invitations to take part of trainings, seminars), forming one part of the audit trail
of the project’s implementation.
Auditee’s response:
The Estonian Chamber of Commerce and Industry is an NGO that operates on membership fees and
services provided for the chamber members and other companies. Our services include trainings.
Normally our trainings have a fee, especially full day trainings that include coffee breaks and lunch.
Therefore, a small fee was initially established for the LEF Network to China project trainings. Based
on our experience a small participation fee disciplines participant to attend the training. Within the
project, it is important that a minimum of 20 people participate in each training. We asked small
participation fee for reducing the no-show rate.
Trainings were free of charge for focus group companies (5 companies who are supported by the
Estonian Chamber of Commerce and Industry and 2 companies who are supported by Estonian
Woodhouse Association), co-operation partners from sectoral agencies and business support
organizations and also for some company representatives who were invited by previously mentioned
co-operation partners. Our aim was to have right target group in the conference eroom – participants
who are truly interested in the topic and are participating all day.
In reality, only a few invoices were issued. Related to the 8 th May 2019 training, we issued invoices for
3 participants in the total amount of € 120. Related to the 12 th June 2019 training we issued invoices
for 23 participants in the total amount of € 575). We asked for the participation fee in the first three
trainings. Related to the 27th November 2019 training, we issued invoices for 2 participants in the total
amount of € 40. As the situation changed (due to the spread of COVID-19), we started organizing online
trainings, which were free of charge for all participants.
We added training advertisements screenshots to the report hence the First Level Control (FLC) and
the Managing Authority (MA) had information regarding collecting a small amount of participation free
from company representatives who were not focus group members. We did not receive feedback from
FLC regarding the issue before the audit.
Page 6
Audit report form v.5
FLC’s response:
The FLC will pay more attention in the future to the potential revenue-generating events to ensure
that the project has not earned any income, which has not been reported with the project’s reports.
FLC makes sure that the earned income will be deducted from the final report and that the
corresponding note/reminder is added in the eMS in the future.
Final conclusion:
According to the auditors finding and the response of the two stakeholders, the project has earned
revenue. There is currently no financial impact in the context of this audit, but before the end of the
project, the FLC must ensure that the earned revenue is deducted from the final report.
Page 7
Audit report form v.5
PART 4 - FOLLOW-UP
This audit report is compiled for use of the Audit Authority of the Central Baltic INTERREG VA 2014-2020
Programme and will be used to draw conclusions about the functioning of the Management and Control
Systems of the above-mentioned Programme. Information in the report will be disclosed to relevant parties
involved of management of the EU funds, including Commission services.
Parties responsible of audit finding follow-up:
1. Findings with Financial impact – The Audit Authority (AA) will inform the Managing Authority (MA)
to take necessary actions to correct shortcomings in the system;
a. Deductions will be made by the MA;
b. Confirmation of deductions will be made by the AA;
c. If needed follow-up audit will be done by GoA members.
2. Findings without the Financial impact
a. The MA will be informed and evaluation will be done if further actions are needed;
b. Confirmation of actions will be followed-up by the AA and if needed by the GoA members.
Upon request from the MA the Auditee is responsible to implement the recommendations and deliver the
proof to the MA.
Auditor: Andreas Kalm
Signed digitally
Auditor: Hannes Vahemäe
Signed digitally
Audit supervisor: Kadi Peets
Signed digitally
Page 8
Hr Mait Palts
Eesti Kaubandus-Tööstuskoda Meie 21.01.2021 nr 10-5/602-1
[email protected]
Auditi lõpparuande edastamine
Austatud härra Palts
Edastame Teile projekti nr CB679 „LEF network to China“ auditi lõpparuande nr CB-22/2020.
Auditi eesmärk oli anda hinnang struktuuritoetuse kasutamisele Vabariigi Valitsuse 7. augusti
2014. a määruse nr 127 „Perioodi 2014-2020 struktuuritoetuse andmise ja kasutamise
auditeerimine” § 4 lõike 1 järgi.
Täname Teid meeldiva koostöö ja osutatud abi eest.
Lugupidamisega
(allkirjastatud digitaalselt)
Kaur Siruli
Finantskontrolli osakonna juhataja
Lisa:
Auditi lõpparuanne (8 lehel)
Sama:
Pr Imbi Uusjärv, Riigi Tugiteenuste Keskus (
[email protected])
Andreas Kalm 611 3133
[email protected]
Suur-Ameerika 1 / 10122 Tallinn / 611 3558 /
[email protected] / www.rahandusministeerium.ee
registrikood 70000272