dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Rahandusministeerium
LepingAvalik

Leping

Rahandusministeerium · 16. november 2020
Viit
9.2-13.5.12/7918-1
Registreeritud
16. november 2020
Dokumendi liik
Leping
Funktsioon
9.2 VÄLISABI JA EUROOPA LIIDU TOETUSTE PROGRAMMIDE KORRALDAMINE
Sari
9.2-13.5.12 ENI Eesti – Vene CBC programmi 2014 – 2020 dokumendid (REGO)
Toimik
9.2-13.5.12/2020
Vastutaja
Mart Pechter (Rahandusministeerium, Kantsleri vastutusvaldkond, Finantskontrolli osakond)

Failid

  • 📎Leping_kõik_allkirjad.asice1336 KB

Sisu (failidest)

Name of the audit Pr oject No XXX “ Project Name ” audit Audit scope , purpose , schedule and works Audit scope (Report number, date, amount) Purpose To evaluate if the expenditure declared is in all material aspects legal and regular and in compliance with the programme rules , in accordance with Agreement on financing and implementation of Cross-Border Cooperation Programme “Estonia-Russia” 2014-2020 Schedule (Dates) Works Desk-based and on-the-spot checks with subsequent analysis and evaluation with regards to: Actual carrying out of the project , Project documentation , Eligibility of costs , Project bookkeeping , Availability of self-financing , Visibility of Programme logos and information . Division of resources Audit carried out by: Role in audit works : Name and surname; Title ( audit supervisor ) Responsible for meeting the audit plan and ensuring quality of the audit as well as confirming it with regards to checklists and working papers. Carries out a constant supervision and quality assessment and fills out the quality control check-list, if necessary. Name and surname; Title ( audit manager ) Responsible for carrying out the audit with the necessary level of quality, including responsibility over the works and documents of other audit team members. Manages the audit team and takes a part of the practical audit works. Name and surname; Title ( audi tor ) Responsible for carrying out the tasks appointed to them with the necessary level of quality, including their own works and documents . Takes a part of the practical audit wor ks in the extent appointed by the audit manager. Annex 1. Declaration of objectivity and independence Some of the most important cases, where the auditor’s independence or objectivity is always impaired . A uditors are assessing specific operations for which they were responsible within the previous year. Auditors are carrying out non-audit related work with regards to the auditee as follows: Auditors are a part of organization’s management or make management decisions; Auditors take a part of creating control procedures or putting them in practice; Auditors are in the role of a manager or a worker within the object of audit; Auditors carry out financial or other crucial tasks for the organization . A uditors have personal interests, personal and/or family connections, or other connections to the object of audit , which may influence or be seen as influencing their objectivity and independence . Auditors receive gifts or other benefits from the audited organization, from partners of that organization or from any other connected person or organization, which may influence or be seen as influencing their objectivity and independence . Auditors submit their judgement with regards to the matters of audit to any other person, which may influence or be seen as influencing their objectivity and independence . Auditors are not granted the access of information, objects, sites or staff that the auditors have deemed as necessary for the purposes of audit, or are hindered in any other way in carrying out the audit. I confirm henceforth that : I have the necessary objectivity and independence with regards to the auditee. I will immediately inform the audit supervisor and/or the head of Audit Authority when this objectivity and impartiality is impaired or in risk of being impaired . I will carry out the audit work with the necessary proficiency and d ue p rofessional c are and will take final responsibility for the quality of my work. Audit carried out by: ( audit supervisor ); ( audit manager ); ( auditor ). / names, signatures / AUDIT No : Name of the audit: Objective of the audit procedures Description of Audit Procedures : Summary and Conclusion : References to other working papers ( including control check-lists ) : Reference to audit findings : Yes / No If yes, then reference to the audit finding in audit working paper (e.g. control check-list) Name and Position Date Auditor: Audit Manager: Audit Supervisor: C HECKLIST FOR AUDIT OF OPERATION AUDIT DETAILS Audited organization (L ead P artner / P roject P artner ) : Auditor(s) : Time o f on-the-spot verification : Persons interviewed : Results of on-the-spot verification : By filling in the check-list, please take note on the correct ver s ion of the Programme guidelines depending from which call has the project been granted, as each call has its own guid e lines . 1 GENERAL INFORMATION Yes/No N/A REF. FINDINGS AND COMMENTS Does the project meet the selection criteria for the cross-border operational programme? Applies only for the L ead P artner audit Does the project fulfil the selection criteria for the cross-border projects? Applies only for the L ead P artner audit Has the project been implemented in accordance with the grant contract and/or partnership agreement? Has project expenditure been incurred during the implementation period as stated in the approved application and grant contract? Have the grant contract and application been amended if required so by the programme guidelines ? 2 BUDGET LINES – ELIGIBILITY Yes/No/ N/A REF. FINDINGS AND COMMENTS 2.1 General questions on eligibility Were the purchased products and / or services related to the objectives of the project? Under section 2, always include a reference to the filled-out comparison check-list as a basis of the opinion Were the costs incurred reasonable? Do the objects physically exist and have the products and / or services been received? Has no ineligible expenditure specified in the respective national regulation s or the programme guidelines been reimbursed? Have the costs incurred for the project been foreseen in the grant contract? Have the costs been converted to euro in accordance with the programme guidelines using the monthly accounting exchange rate of the EC in the month during whic h that expenditure was incurred ? Has the beneficiary not received any funding from the E uropean U nion or other sources to reimburse project expenditure? Has the project met its objectives , outputs and results as l aid down in the programme guidelines ? If not, please evaluate whether the target val u es will likely be achieved by the end of the project’s implementation period or whether th ere could be a risk that the targets will not be achieved or are achieved with significant delay ? Applies only for the Lead Partner audit Please indicate here the target values of the project ’s output indicators and the values achieved so far. Have the output indicators been clearly described in advance and has the achievement of the indicators been calculated correctly? Applies only for the Lead Partner audit Have the output indicators been chosen correctly in advance, considering the aims of the Programme as a whole and this project and partner in particular? Applies only for the Lead Partner audit Has the J oint Technical Secretariat, the Control Contact Point or the M anaging Authority carried out on-the-spot checks to verify the ac hievement of previously chosen target values or indicators ? Applies only for the Lead Partner audit 2.2 Staff costs Are staff costs related to persons who are formally working for the project on a full-time, part-time or hourly basis? Do employment contracts, job descriptions or other supporting documents of the persons working for the project explain their tasks and involvement in the project? Have staff costs ( including net salary, national taxes and holiday pay) been calculated and paid correctly? In case a person works part-time for the project and performs part-time other tasks, is the actual salary rate used when calculating his/her costs in the project budget? Different hourly rates in the frame of the same employment contract must be avoided, and the salary payments must relate to responsibilities specified in a job description of the individual staff member . Has unpaid voluntary work (in-kind contribution) not been included as eligible ? 2.3 Preparation, office and administration costs Has the partner received preparation costs in the lump sum of EUR 1,000? Has the flat rate (up to 7 % of eligible direct staff costs and not exceeding EUR 60,000 ) used for calculating and reporting office and administrative costs been calculated correctly and under fair, equitable and verifiable calculation method ? Do the costs reported under other budget lines not include preparation, office and administrative expenditure? 2.4 Travel and accommodation costs Have travel and accommodation costs and daily allowances been incurred only for persons who are directly related to project activities? Have travel and accommodation costs been reimbursed in accordance with the applicable respective national regulation s or the programme guidelines ? In case of travel and accommodation costs outside the programme area, have they been foreseen in the application and reported in accordance with the programme guidelines ? 2.5 External expertise and services costs 2.5.1 Has expenditure for the financing of external expertise and services provided by a public or private body or by a natural person : been incurred outside of the partner organization (please note that contracting persons working within the organization is not allowed) ; been linked to the activities in the project application ; had inputs to the project that are clearly identifiable ? 2.5.1. Has the rule of no sub-contracting between project partners and associates been adhered to? 2.5.2. Have services related to the organization and implementation of events or meetings (incl. rent, catering or interpretations) been foreseen in the agenda or planning document ? 2.5.3 In case of external experti se costs outside the programme area, have they been reported in accordance with the programme guidelines ? 2.6 Equipment costs In case the equipment has been purcha sed before the project approval: have the depreciation costs been proved to have the equivalent probative value? do the costs relate to the period of support for the operation? has the grant not contributed towards the acquisition of the depreciated assets? Has no depreciation been declared for equipment ? Has the rule of no sub-contracting between project partners and associates been adhered to? Is the purchased equipment physically available? 2.7 Investment costs 2.7.1. Are investments in line with the programme requirements and necessary for the achievement of the project’s objectives? 2.7.2. Has no depreciation been declared for investments (please note that depreciation is ineligible in this case) ? 2.7.3. Have purchases, constructions or repair works been carried out within the framework of the project on the basis of contracts and/or paid against invoices? 2.7.4. Has the ownership of the land / buidlings where the works are being carried out, been provided? 2.7.5 Has the purchase of land / sites been in accordance with the programme rules? 2.7.6. Has the nature of ownership and purpose of the use of investments remained the same during at least 5 years after the end of the project? 2.8 Price offers and public procurement 2.8.1. Have competitive price offers been obtained for purchases from EUR 5,000 (not including VAT) in accordance with the programme guidelines ? 2.8.2. Have public procurement processes been carried out in compliance with the national public procurement rules , as evidenced by the national public procurement check-list? Include a reference to the filled-out national public procurement check-list 2. 9 Large Infrastructure Projects 2.9.1. Has the Large Infrastructure Project partner reported eligible preparation costs in addition to the lump sum payment in accordance with the programme guidelines? 2.9.2. Have the payments to Large Infrastructure Projects followed the the programme guidelines and the options agreed in the grant contract and/or partnership agreement? 2.9.3. Has the Large Infrastructure Project partner used the Contingency Reserve in accordance with the programme guidelines ? 3 REVENUE GENERATION Yes/No/ N/A REF. COMMENTS Is the project net revenue assessed before the approval of the application? Have eligible costs been reduced for the project whose net revenue was so assessed, using the flat rate revenue percentage or the cost-benefit analysis based on discounted cash flows (funding gap method)? In respect of the project that earns revenue during the project period, have eligible costs been reduced by net revenue by the final payment at the latest? 4 AUDIT TRAIL AND ACCOUNTING Yes/No/ N/A REF. FINDINGS AND COMMENTS Has a separate ly identifiable bookkeeping list/general ledger been kept for the project and project expenditure corresponds to that? Is the expenditure supported by adequate documentation (incl. contracts, invoices, time-sheets, etc.)? Is there evidence that payments for the costs incurred have been made in the correct amount and during the eligibility period? Has refundable VAT been deducted? Have the funds been paid by the Certifying A uthority function to the L ead Partner wit hout delay, in a correct amount? Have the funds been transferred from the L ead P artner to the P roject P artners wit hout delay, in a correct amount? In case of Lead Partner audit, check all transactions to the P roject P artner s following the receival of the payment from the C ertifying A uthority function . Has the final payment by the Certifying A uthority function to the L ead Partner been paid after the completion of project activities? Have the archiving rules been implemented in accordance with the programme guidelines (five years from the date of balance or ten years in the case of state aid) ? 5 HORIZONTAL ISSUES Yes/No or N/A REF. FINDINGS AND COMMENTS 5.1 Information and publicity Have all objects and activities financed from the Programme funds (e.g. buildings, machinery, equipment, events, etc.) been marked with the Programme logo and information ? Does the logo and information meet the Programme requirements in terms of its size, location, time of placement, etc.? Has the beneficiary informed the public about the support obtained from the Funds by the following? providing on the beneficiary's website, where such a website exists, a short description of the operation, proportionate to the level of support, including its aims and results, and highlighting the financial support from the Union; placing plaque or billboard, at least one poster with information about the project minimum size A3), including the financial support from the Programme , at a location readily visible to the public, such as the entrance area of a building? 5.2 Equal rights and environment 5.2.2. Does the information that has become available during the audit indicate that the equal treatment and/or environmental requirements have not been violated? 5.3 State aid 5.3.1. Has state aid been granted correctly? Only applicable to partners situated in Estonia. To evaluate whether the state aid has been granted correctly, please answer the following questions , if the audit concerns partners situated in Estonia (5.3.2 – 5.3.8) 5.3.2 Is the recipient of the support an ‘undertaking’? Undertakings are entities engaged in an economic activity, regardless of their legal status and the way in which they are financed. 5.3.3 Does the project involve a transfer of State resources? State resources are all resources of the public sector, including ESIF resources. Yes Always applicable 5.3.4 Is the financing imputable to the State? It is imputable when public authorities grant the support or if they designate private or public bodies to administer the granting as it is normally the case for financings involving ESIF Yes Always applicable 5.3.5 Is there an economic advantage to the recipient of the support? Advantage is any economic benefit which an undertaking would not have obtained under normal market conditions. 5.3.6 Is the support ‘selective’? It is selective if it is favoring certain undertakings or categories of undertakings or certain economic sectors; general measures which are effectively open to all undertakings on an equal basis are not selective; typically ESIF-supported fundings are ‘selective’ Yes Always applicable 5.3.7 Is there a potential distortion of competition? It is a potential distortion if the funding is liable to improve the competitive position of the recipient; it can be absent in cases of legal monopolies; also in case of de minimis aid the support does not qualify as ‘State aid’; for de minimis aid specific requirements need to be fulfilled which are listed in another checklist 5.3.8 Is there an effect on trade between Member States? An effect on trade can normally be assumed when all other listed criteria are met; in exceptional cases an effect on trade may be missing for financing for purely local activities; examples of purely local activities are mentioned in the draft NOA 5.4 De minimis rule 5.4.1. Has de minimis rule been followed correctly? Only applicable to partners situated in Estonia. 5.5 State aid under GBER regulation 5.5.1 In case of state aid granted on the basis of the GBER: have the costs been classified into correct activities as laid down in the regulation > the correct article has been used for granting the aid; and the correct funding rate has been used? If needed, a correct cost-benefit analyses have been carried to calculate the financial need (as required by the regulation)? Only applicable to partners situated in Estonia. 5.5.2 In case of state aid granted on the basis of the GBER, it has been checked, that: the aid may not be given to certain activities and sectors (art 1 points 2 and 3); the aid receiver is not in financial difficulties (art 1 point 4); the aid has an incentive effect (art 6)? Only applicable to partners situated in Estonia Audit m anager : Audit supervisor: (Digitally s igned) (Digitally signed) Cross-Border Co ope r ation Programme Estonia-Russia 2014-2020 Project No: Project name: Project Partner Name (L P/PP): Thematic o bjective: Audit No: Audit ed organization : Final audit report / Draft audit report XX.XX .20XX SUMMARY OF AUDIT RESULTS Audit outcome : Based on the audit work performed, the auditors have obtained reasonable assurance that the expenditure declared is in all material aspects legal and regular and in compliance with the programme rules . A udit opinion : no findings ; significant findings ; non-significant findings . List of significant findings : XXX The project audit has been carried out in compliance with the International Standards for the Professional Practice of Internal Auditing . We wish to thank the auditee for the assistance and cooperation provided during the audit . We confirm that the final audit report consists of xx pages . TABLE OF CONTENTS TOC \o "1-3" \h \z SUMMARY OF AUDIT RESULTS PAGEREF _Toc483232174 \h 2 TABLE OF CONTENTS PAGEREF _Toc483232175 \h 3 PART A PAGEREF _Toc483232176 \h 4 1. Audit object and audited expenses PAGEREF _Toc483232177 \h 4 2. Limitations PAGEREF _Toc483232178 \h 5 3. Audit follow-up activities PAGEREF _Toc483232179 \h 5 PART B PAGEREF _Toc483232180 \h 6 AUDIT FINDINGS PAGEREF _Toc483232181 \h 6 The funding has been used to a great extent in the intended manner, in a reasonable and efficient way and in accordance with the objectives and requirements laid down in the subsidy contract and the programme manual. PAGEREF _Toc483232182 \h 6 Significant/ non-significant finding 1.1 – Title (ineligible expense identified, EUR x) PAGEREF _Toc483232183 \h 6 PART A Audit object and audited expenses 1.1 GENERAL INFORMATION ABOUT THE AUDIT Project name: N ame Project number: N umber Strategic and thematic objective : Name Beneficiary audited (LP/PP) : Name Contact person of the beneficiary : Name Date of subsidy contract : D ate Audit scope and period : D ate 1.2 INFORMATION ABOUT THE AUDIT Basis : Agreement on financing and implementation of Cross-Border Cooperation Programme “Estonia-Russia” 2014-2020 Audit Authority’s work plan for 20XX . Objective : To provide an audit opinion that: the operation was selected in accordance with the selection criteria for the cross-border programme ; the expenditure declared to the participating nations and the Commission corresponds to the accounting records and that the required supporting documentation demonstrates an adequate audit trail; for expenditure declared to the participating nations and the Commission, outputs and results underpinning payments to the beneficiary have been delivered. Person(s) carrying out the audit : Name , institution, unit, profession A udit duration : D D.MM.YYYY – DD.MM.YYYY Methodology : Audit manual of the Estonia- Russia Programme Audit procedures performed at the beneficiary audited : During the on-the-spot check, interviews were conducted with the persons involved in project implementation and analysis/evaluation was made of the following : project’s actual implementation , documentation related to project implementation , eligibility of costs , arrangement of book-keeping related to the project , existence of co-financing , use of the logos . Sampling methodology ( if applicable , then information shall be provided by the A udit A uthority ): population size ; sampling steps or method ; sample size before and after expansion (if applicable) and final audited total amount 1.3 AUD ITED EXPENSE S Total amount of certified expenses subject to auditors’ opinion on the basis of cost documents : Period ( e.g. (01.07.201 8 - 30.06.201 9 ) and amount audited Size of the sample ( EUR ; %) : Amount, percentage Ineligible expenditure identified ( EUR ): amount EU contribution National public contribution Private sector contribution Total Ineligible amount (EUR): amount amount amount amount Ineligible amount outside the audit scope (EUR): amount amount amount amount Error rate (%) : percentage Limitations The audit procedures were carried out in compliance with internationally accepted auditing standards and the audit report was prepared using the principles of independenc e and objectivity . Auditors conclude that all data presented during the audit and other oral and written information made available during the audit presents a true and fair view of the activities performed during the project implementation and are sufficient to provide an opinion about the project. In case of additional information that was not provided or was no t known to auditors, the conclusions reached by auditors might have been different. Audit follow-up activities The beneficiary shall take into account the findings and recommendations made in Part B and the decisions made by the M anaging A uthority . The A udit A uthority shall monitor the implementation of recommendations made by the auditors. PART B AUDIT FINDINGS Use of funding as intended The funding has been used in material aspects in the intended manner , in a reaso na ble and efficient way and in accordance with the objectives and requirements laid down in the subsidy contract and the p rogramme m anual . Significant / non-significant finding 1.1 – Title ( ineligible expense identified, EUR x) XXX Risk to the project implementation : Recommendation on the project implementation : Comments of the beneficiary audited : Commen ts of the Financial Control : Comments of the M anaging A uthority /J oint Technical S ecretariat : Person responsible for implementation of the recommendation and date at the beneficiary : 2. Accuracy of book-keeping records The book-keeping records for the project are in all material aspects in compliance with the current legislation . 3. Amount and timing of funding The granting of funding has in all material aspects been made available in the amount foreseen and on time, an d the co-financing has been guaranteed. 4. Carrying out of public procurements The beneficiary has in all material aspects carried out public procurements in compliance with the current legislation . 5. Granting of state aid The project does not involve state aid. / The state aid has been granted to the project and used by the beneficiary in correct manner, in accordance with the state aid rules. 6. Communication and publicity When informing and disclosing the use of funding, the beneficiary has in all material aspects followed the current legislation . 7. Other comments (if applicable) XXX We confirm that the final audit report has X ( number ) pages . Audit m anager : Audit s upervisor : Name Name Profession Profession Place , date 1. DEFINITIONS Administrative Code “Code on Administrative Offences of the Russian Federation” of 30.01.2001 No. 195-FZ; Closed Auction Tender procedure in the form of a closed auction, as defined under Art. 86 Procurement Law; Closed Contest Tender procedure in the form of a closed contest, as defined under Art. 85 Procurement Law; Closed Limited Contest Tender procedure in the form of a closed limited contest, as defined under Art. 85 Procurement Law; Closed Two-stage Contest Tender procedure in the form of a closed two-stage contest, as defined under Art. 85 Procurement Law; Competition Authority Federal Antimonopoly Service (FAS) and its territorial subdivisions; Competition Law Federal law “ On Protection of Competition” of 26.07.2006 No. 135-FZ; Contests Open Contest, Limited Contest, Two-stage Contest, Closed Contest, Closed Limited Contest, Close d T wo-stage Contest jointly or either one of them separately, depending on the context; Electronic Auction Tender procedure in the form of an electronic auction, as defined under Art. 50 Procurement Law; EPS Uniform electronic procurement system, as defined under Art. 4 Procurement Law; Limited Contest Tender procedure in the form of a limited contest, as defined under Art. 56 Procurement Law; Mandatory Prescription Mandatory prescription issued by the competition authority to cancel tender, disregard certain provisions of tender documents, amend tender documents or perform other actions to remedy the violation; Offer Request Tender procedure in the form of an offer request, as defined under Art. 83 Procurement Law; Open Contest Tender procedure in the form of an open contest, as defined under Art. 4 8 Procurement Law; Open Contests Open Contest, Limited Co ntest and Two-stage contest jointly; Procurement Law Federal law “On Contractual System in the Area of Purchasing Goods, Works and Services for State and Municipal Needs” of 05.04.2013 No. 44-FZ; Products Goods, works and services requested for procurement by procuring authorities under Procurement Law; Quotes Request Tender procedure in the form of a quotes request , as defined under Art. 72 Procurement Law; Sole Supplier Procurement Non-competitive procedure without any tendering involved in the form of p rocurement from a sole supplier , as provided for by the Procurement Law; Two-stage Contest Tender procedure in the form of a two-stage contest, as defined under Art. 57 Procurement Law. 2. CHECK-LIST TABLE No. Error c riteria by the European Commission Control question concerning re striction under Russian law Reference to re striction under Russian law Control question assessment (YES, NO or N/A) Complicating or mitigating circumstances and the necessary correction percentages Final c omment by the controller Lack of publication of contract notice or Unjustified direct award (i.e. unlawful negotiated procedure without prior publication of a contract notice) Is the p rocurement notice published in the EPS as necessary? Art 42 Procurement Law Complication The procurement notice was not published when necessary: correction of 100% required. Mitigation Same as above, but publicity was made by other adequate means : correction of 25% required Is the pr ocurement winner chosen based on the criteria and under the correct procurement procedure, as established by Procurement Law applicable in this specific case? Contests: Item 8 Art 53 Procurement Law Electronic Auction: Items 10-11 Art 69 Procurement Law Closed Auction: Item 7 Art 90 Procurement Law Offer Request: Item 16 Art 83 Procurement Law Quote Request: Item 1 Art 72 Procurement Law Artificial splitting of works/services/supplies contracts Are some contracts, especially those of low value , not been qualified for less stringent procurement procedures due to irregular splitting? Item 1 Art 93 Procurement Law Complication The procurement notice was not published when necessary: correction of 100% required. Mitigation Same as above, but publicity was made by other adequate means : correction of 25% required Lack of justification for not subdividing contract into lots Is the combining of products into one lot been prohibited if they are not related technologically or functionally and the practice restricts the number of procurement participants? Item 3 Art 17 Competition Law Item 1 Art 33 Procurement Law Correction of 5% required Non-compliance with time limits for receipt of tenders or time limits for receipt of requests to participate o r Failure to extend time limits for receipt of tenders where significant changes are made to the procurement documents Is the following minimum number of days available for tender application? Open Contests: 20 / 15 business days Closed Contests: 20 business days Electronic Auction: 7 / 15 business days Closed Auction: 10 business days Offer Request: 5 business days Quote Request: 3 / 7 business days For checking the extension of time limits for receipt of tenders, please refer to No. 6 below. Open Contests: Item 1 Art 49 / Item 1 Art 54.2 Procurement Law Closed Contests: Item 4 Art 85 Procurement Law Electronic Auction: Items 2-3 Art 63 Procurement Law Closed Auction: Item 5 Art 86 Procurement Law Offer Request: Item 3 Art 83 Procurement Law Quote Request: Item 1 Art 74 Procurement Law Extension of time limits for receipt of tenders: please refer to No. 6 below. Complication The reductio n of the time limits is more than or equal to 85% : correction of 100% required. Mitigation The reduction of the time limits is more than 50% but less than 85%: correction of 25 % required. Mitigation The reduction of the time limits is more than 30% but less than 5 0 %: correction of 10 % required. Mitigation The reduction of the time limits is less than 30 %: correction of 5 % required. Insufficient time for potential tenderers/candidates to obtain tender documentation or Restrictions to obtain tender documentation Is the tender documentation provided at the request of tender participants? Is the tender documentation available in the EPS? Depends on applicable procurement procedure , please see the Procurement Law Complication Time for economic operators to obtain tender documentation is equal to or less than 5 days or the access is not unrestricted and free: correction of 25 % required. Mitigation Time for economic operators to obtain tender documentation is less than 50% of the time limits for receipt of tenders: correction of 10 % required. Mitigation Time for economic operators to obtain tender documentation is less than 80% of the time limits for receipt of tenders: correction of 5 % required Lack of publication of extended time limits for receipt of tenders or Failure to extend time limits for receipt of tenders Has the receipt of tender applications extended in certain cases? Open Contests: if tender documentation was amended, 10 extra business days) Open Contest in electronic form: if tender documentation was amended, at least 10 business days must be available until expiration of application deadline Electronic Auction: if tender documentation was amended or clarified, at least 15 / 7 business days must be available until expiration of application deadline Quotation Request: if tender documentation was amended, at least 7 / 4 business days must be available until expiration of application deadline Closed Auction: if tender documentation was amended, at least 10 business days must be available until expiration of application deadline Where a tender is deemed to have failed: in certain instances established by the Procurement Law Open Contests: Item 4 Art 49 Open Contest in electronic form: Item 4 Art 54.2 Procurement Law Electronic Auction: Item 6 Art 63 Procurement Law Quotation request: Item 6 Art 74 Procurement Law Closed Auction: Item 7 Art 87 Procurement Law Complication The initial tim e limits for receipt of tenders were extended without appropriate publication or the time limits were not extended as necessary: correction of 10% required. Mitigation The initial time limits for receipt of tenders were extended without appropriate publication but publicity was made by other means : correction of 5 % required. Cases not justifying the use of a competitive procedure with negotiation or a competitive dialogue Is a Two-stage Contest permitted only for the following? 1) entering into an R&D contract, 2) entering into an energy service contract, 3) entering into a contract for creation of a new piece or literature or art, or 4) the procuring entity to discuss the Products’ specifications with tender participants as an absolute necessity Item 2 Art 57 Procurement Law Correction of 25% required Non-compliance with the procedure established in the Directive for electronic and aggregated procurement Are the Electronic Auctions and Open Contests in electronic form conducted in accordance with the procedure outlined in the procurement Law? Electronic Auctions: Art 68 Procurement Law Open Contests in electronic form: Art 54.1-54.7 procurement Law Complication The non-c ompliance led to the award of a contract to a tender other than the one that should have been awarded : correction of 25 % required. Mitigation The situation above was not true : correction of 10 % required. Failure to publish in the contract notice the selection and/or award criteria (and their weighting), or conditions for performance of contracts or technical specifications or Failure to describe in sufficient detail the awar d criteria and their weighting or Failure to communicate/publish clarifications/additional information. Are the products described in tender documentation in accordance with the requirements established by Procurement Law? Only the evaluation criteria outlined in the Procurement Law may be used. A weighting value of each evaluation criterion must be outlined in the tender documentation. The procuring entity must clarify tender documentation at the request of a tender participant and publish such clarification in the EPS. Product description: Item 1 Art 33 Procurement Law Evaluation criteria: Item 9 Art 32 Procurement Law Clarification of tender documentation (depends on procurement procedure): Open Contests: Item 7 Art 50 , Item 7 Art 54.3 Procurement Law Electronic Auction: Item 3 Art 65 Procurement Law Closed Contests: Item 17 Art 85 Procurement Law Closed Auction: Item 4 Art 87 Procurement Law Complication The criteria and their weighting were not published : correction of 25% required. Mitigation The conditions for perfor mance of contracts or technical specifications or sufficient detail of the criteria or clarifications or additional information on criteria were not published : correction of 10 % required. Use of - criteria for exclusion, selection, award or - conditions for performance of contracts or - technical specifications that are discriminatory on the basis of unjustified national, regional or local preferences Are only the evaluation criteria outlined in the Procurement Law used? Item 9 Art 32 Procurement Law Complication Cases in which economic operators could have been deterred from tendering because of criteria o r conditions for performance of contracts that include un justified national, regional or local preferences : correction of 25% required. Mitigation Same as above but a minimum level of competition was still ensured : correction of 10 % required. Is the description of products (including ways to perform a contract and technical specifications) not restricting the number of tender participants? Item 3 Art 17 Competition Law Item 1 Art 33 Procurement Law Unjustified limitation of subcontracting Have the procuring entities not established additional requirements to procurement participants not outlined in the Procurement Law (limitations on subcontracting are expressly permitted in selected cases only )? Item 6 Art 31 Procurement Law Correction of 5% required Selection criteria (or technical specifications) were modified after opening of tenders or were incorrectly applied Are the selection criteria established and applied in accordance with the Procurement Law? Can lifecycle procurement criteria be applied? General requirement: Item 1 Art 32 Procurement Law Lifecycle procurement: Government Regulation of 28.11.2013 No. 1087 Correction of 25% required Evaluation of tenders using award criteria that are different from the ones stated in the contract notice or tender specifications or Evaluation using additional award criteria that were not published Are the selection criteria established and applied in accordance with the Procurement Law? Item 9 Art 32 Procurement Law Complication The criteria stated in the contract notice were not fo llowed during the evaluation of tenders, or additiona l award criteria not published were used in that e valuation and the effect was discriminatory : correction of 25% required. Mitigation Same as above but the effect was not discriminatory : correction of 10 % required. Insufficient audit trail for the award of the contract Are the procuring entities keeping documents and paper trail on procurement contracts? Item 3 Art 103 Procurement Law Complication The controllers are refused access to documents: correction of 100 % required. Mitigation The relevant documents are available but insufficient : correction of 25 % required. Negotiation during award procedure, including modification of the winning tender during evaluation Is the negotiation prohibited (unless conducted in accordance with the Procurement Law)? General prohibition: Items 1-2 Art 46 Procurement Law Two-stage Contest negotiation: Item s 5 , 9 Art 57 Procurement Law Correction of 25% required Unjustified rejection of abnormally low tenders Is the rejection of tender applications only permitted on grounds outlined in Procurement Law? Item 9 Art 31 Procurement Law Additional security requirements to participants with abnormally low bids: Art 37 Procurement Law Correction of 25% required Conflict of interest with impact on the outcome of the procurement procedure Is the absence of conflict of interest a mandatory condition for tender participation? Clause 9 Item 1 Art 31 Procurement Law Correction of 100 % required Bid-rigging (established by a competition / anti-cartel office, a court or other competent body) Are the agreements between procuring entities and procurement participants that restrict competition prohibited? Item 2 Art 17 Competition Law Correction of 100% required Modifications of the contract elements set out in the contract notice or tender specifications, not in compliance with the Directives Is the modification of procurement contract permitted only in limited cases and to a limited extent? Item 1 Art 95 Procurement Law Correction of 25% required AUDIT MANUAL FOR ESTONIA-RUSSIA CBC PROGRAMME 2014-2020 Compiled by: Audit Authority As situated in: Financial Control Department Ministry of Finance of the Republic of Estonia Approved by: (signed electronically) Kaur Siruli Head of Audit Authority TABLE OF CONTENTS TOC \o "1-3" \h \z \u TABLE OF CONTENTS PAGEREF _Toc42505346 \h 2 INTRODUCTION PAGEREF _Toc42505347 \h 4 1 GENERAL PRINCIPLES PAGEREF _Toc42505348 \h 5 1.1 Legal basis PAGEREF _Toc42505349 \h 5 1.2 Identification of audit bodies PAGEREF _Toc42505350 \h 5 1.3 Requirements for auditors when performing audit work PAGEREF _Toc42505351 \h 5 1.4 Outsourced audit service PAGEREF _Toc42505352 \h 6 1.5 Quality assurance and audit supervision PAGEREF _Toc42505353 \h 7 1.6 Requirements for documentation PAGEREF _Toc42505354 \h 7 1.6.1 Documentation of audit procedures PAGEREF _Toc42505355 \h 7 1.6.2 Referencing PAGEREF _Toc42505356 \h 8 1.7 Setup of the audit file PAGEREF _Toc42505357 \h 8 1.8 Reporting of potential fraud cases PAGEREF _Toc42505358 \h 9 1.9 Reporting of irregularities to OLAF PAGEREF _Toc42505359 \h 9 1.10 Follow-up activities PAGEREF _Toc42505360 \h 9 2. SYSTEM AUDITS PAGEREF _Toc42505361 \h 11 2.1 Objective PAGEREF _Toc42505362 \h 11 2.2 Principles PAGEREF _Toc42505363 \h 11 3 PROJECT AUDITS PAGEREF _Toc42505364 \h 14 3.1 Definition PAGEREF _Toc42505365 \h 14 3.2 Objective and principles PAGEREF _Toc42505366 \h 14 4. Audit of accounts PAGEREF _Toc42505367 \h 16 4.1 Definition PAGEREF _Toc42505368 \h 16 4.2 Objective, subject and scope PAGEREF _Toc42505369 \h 16 5 AUDIT PROCEDURES PAGEREF _Toc42505370 \h 17 5.1 Planning an audit PAGEREF _Toc42505371 \h 17 5.1.1Registration of the audit and collection of background information PAGEREF _Toc42505372 \h 17 5.1.2 Audit plan and programme PAGEREF _Toc42505373 \h 18 5.1.3 Preparation of an audit announcement letter PAGEREF _Toc42505374 \h 18 5.2 Conducting an audit PAGEREF _Toc42505375 \h 18 5.2.1 Audit procedures and documentation of information PAGEREF _Toc42505376 \h 19 5.2.2.3 List of documents and closure report PAGEREF _Toc42505377 \h 21 5.3 Preparation of the audit report PAGEREF _Toc42505378 \h 21 5.3.1 Preparation of the preliminary audit report PAGEREF _Toc42505379 \h 22 5.3.2 Coordination of the preliminary audit report PAGEREF _Toc42505380 \h 22 5.3.3 Preparation of the final audit report PAGEREF _Toc42505381 \h 23 5.3.3.1 Errors and omissions in the final audit report PAGEREF _Toc42505382 \h 23 5.4. Communication of audit results PAGEREF _Toc42505383 \h 23 ANNEXES TO THE MANUAL PAGEREF _Toc42505384 \h 24 INTRODUCTION The purpose of the Audit Manual of the Estonia-Russia CBC Programme 2014-2020 is to help auditors to carry out high-quality project and system audits and to help the A udit Authority to ensure uniform quality of audits. The audit methodology has been compiled to reach the objectives laid down in the audit strategy for the Estonia-Russia CBC Programme and it specifies implementation of audit procedures described therein. The requirement for carrying out project audits of an annual sample, management and control system audits and audits of accounts comes from Agreement on financing and implementation of Cross-Border Cooperation Programme “Estonia-Russia” 2014-2020, under which the A udit A uthority with the support of the Group of Auditors ensures that audits are carried out on the management and control systems, on an appropriate sample of projects and on the annual accounts of the Programme. The manual has jointly been compiled by the Audit Authority situated in the Financial Control Department of the Ministry of Finance of the Republic of Estonia with comments and by recommendations from the Members of the Group of Auditors both in Estonia and Russia. The manual consists of four chapters and annexes. Chapter I gives a general overview of the principles and methodology for carrying out audits . Chapters II and III describe system audits and project audits, respectively. Chapter IV describes the audit procedures by stages including requirements for documentation. Annexes contain the forms of working papers and checklists that are used to carry out project and system audits. Any latest form of the A udit M anual shall enter into force if signed by the head of the AA, after considering the comments and recommendations made by the Members of the Group of Auditors I f necessary, amendments and improvements may be made to the Audit Manual. This process shall take place at least on annual basis. GENERAL PRINCIPLES Legal bas is The conducting of project and system audits is based on the following: Agreement on financing and implementation of Estonia-Russia programme. Audit Strategy of the Estonia-Russia programme. Rules of procedures of the Group of Auditors for Estonia-Russia programme. The legislation on Participating States, wherever applicable. Identification of audit bodies Audit activities will be carried out in co-operation of the AA and the Members of the Group of Auditors from Estonia and Russia, as detailed in the Rules of procedures. Project audits in Estonia will be carried out by the Members of the Group of Auditors in Estonia. Project audits in Russia will be outsourced by the Audit Authority. System audits will be carried out by the Members of the Group of Auditors in Estonia. All Members of the Group of Auditors can overview any part of any audit process and provide comments and proposals , whenever they wish to do so. Requirements for auditors when performing audit work The Audit Authority shall ensure that audit work performed is in line with internationally accepted audit standards. In addition to the latter, the AA shall use this manual, the respective guidelines and legislation of the European Commission and participating states on auditing when planning and conducting audits and preparing audit reports. The person conducting an audit has the right to recommend to the audit supervisor the involvement of independent experts in the audit in order to solve questions requiring special knowledge and expertise in this field. Internal auditors must possess the knowledge, skills, and other competencies needed to perform their individual responsibilities . The auditors shall be impartial and avoid any conflict of interest when planning or conducting audits, and communicating their results . The auditors shall follow the IIA International Standards for the Professional Practice of Internal Auditing or other internationally accepted audit standards when carrying out audit activities. A uditors must have an impartial, unbiased attitude and they must avoid any conflict of interest . All auditors participating in an audit shall confirm their objectivity, competence and lack of personal interest by signing the declaration of objectivity, which shall be done before the launch of audit procedures. All other persons involved in the audit, e.g. independent experts shall also sign the declaration of objectivity. Outsourced audit service The Audit Authority with the support of the Group of Auditors will outsource audit work from independent audit companies for the purpose of conducting project audits in Russia. The Audit Authority shall make sure that the service provider has necessary competencies and skills for the provision of the service and that the persons carrying out project audits shall confirm their independence. Requirements for the methodology and quality of a project audit as well as retention of audit working papers and evidence shall be laid down in the contract to be concluded with the audit firm, including: the audit firm shall adhere to the internationally accepted audit standards and the code of ethics, prevailing legal acts and good practice, apply their best knowledge and as well as carry out their work duties at a high professional level; the audit firm shall electronically submit the audit working papers, including checklists and lists of findings, all prepared in English in accordance with this manual. where using electronic signature is not possible, the auditors, audit manager and audit supervisor will sign the required audit documents on paper and deliver them to the Audit Authority via post. the final responsibility for all work done will rest with the auditors performing, managing and supervising the audit work, and this responsibility is confirmed by their signatures. After completion of audit procedures, the audit company shall present the complete audit file, including the documents collected during the audit, to the Audit Authority. The audit file must be electronically submitted. The Audit Authority shall supervise the progress of outsourced services to be responsible for their quality, including compliance with the methodology described in the Audit Manual, accuracy and relevance of the results presented in the final audit report. The preliminary audit project shall be reviewed by the Audit Authority with the comments and suggestions added by the Russian Member of the Group of Auditors , before sending it for comments to the auditee . If needed, the working papers or preliminary project shall be amended by the audit company as a result of this quality control. Quality assurance and audit supervision In accordance with audit standards, the audit supervisor must have develop ed and maintain ed a quality assurance and improvement programme that covers all aspects of the internal audit activity and includes both internal and external assessments . Engagements must be properly supervised to ensure objectives are achieved, quality is assured, and staff is developed . The audit supervisor monitors the work performed by auditors on an ongoing basis and conducts assessments of auditors. Audit supervision shall be carried out to ensure fulfilment of audit objectives and shall be performed on an ongoing basis by the audit supervisor. The supervision process shall start during the audit planning phase, and shall continue during the conducting, reporting and follow-up activities phase. Audit supervision includes: identification of the resources necessary for carrying out audits; provision of relevant guidelines during planning the engagement and approval of the audit plan and programme; monitoring of the implementation of the approved audit plan and programme, unless changes are explained and allowed (for system audits); making sure that working papers are sufficient to support the auditors’ opinion and conclusions; ensuring the accuracy, objectivity, clarity, constructiveness and timeliness of the audit report; ensuring the fulfilment of audit objectives; giving an opportunity to develop the knowledge, skills and other competencies of auditors. All audit working papers shall be reviewed both by the audit manager and audit supervisor to ensure that they have been accurately prepared and support reporting, and that all necessary procedures have been carried out. Requirements for documentation Documentation of audit procedures The purpose of audit procedures is to analyze and evaluate the audit area; identify and document sufficient, reliable, relevant and useful information and evidence to support the findings in the final audit report and to attain the audit objectives . If needed, additional audit working papers to the main compulsory audit check-lists may be compiled to describe and document the procedures carried out and conclusions made by the auditor (Annex 2). Working papers shall be signed at the date of completing the procedures, and they shall be sufficient, reliable, relevant and useful so that an opinion could be made on their basis and/or that shall support audi tors’ opinions and conclusions. The auditor who prepared the working paper, audit manager and audit supervisor shall sign all working papers p repared by the audit workgroup , including check-lists . All documents shall be signed digitally whenever possible to avoid paper documents. W here using electronic signature is not possible, the auditors, audit manager and audit supervisor will sign the required audit documents on paper and deliver them to the Audit Authority via post . A separate working paper for a procedure should not be prepared when there are sufficient ly detailed check-lists or other equivalent working papers with a complete and accurate information covering the same topic . Referencing All documents to be kept in the audit file shall have a reference number given to them on the basis of the structure of the electronic audit file and the logical sequence of documents. The reference number given to a document shall be unique and it shall be used to identify the document throughout the audit documentation. Cross-referencing shall be used to ensure a complete audit trail and interconnection between working papers and evidence. Setup of the audit file Any information received during the audit that can be used as the basis for drawing conclusions, making recommendations, evaluating risks and planning future audits shall be documented. Documents received during the audit and the working papers prepared by auditors which form the basis for findings, risks and recommendations presented in the final audit report, shall be included in the audit file. The audit file shall be set up in a way that would ensure security of evidence and ease of traceability. The audit file is electronic, i.e. all audit evidence shall be kept in the electronic format. The retention and archiving of the final audit file in the possession of the Audit Authority shall be based on the procedure for retention of electronic documents of the M inistry of Finance of Estonia . The proposed audit file shall consist of at least four folders and if necessary, a fifth folder: Reporting – final audit report (A1), auditee’s comments to the preliminary audit report (A2) and preliminary audit report (A3); Management – audit’s official correspondence (B1) and electronic correspondence (B2); Planning – background information collected prior to the start of audit (C1), information related to planning (C2) and audit plan and declaration of objectivity (C3); Implementation – lists of findings (D1), summaries of procedures (D2), check-lists (D3 ) and evidence collected during audit implementation (D4); Follow-up activities (in case of significant findings) After the approval of the final audit report and assurance of the quality of the audit file by the audit supervisor , the audit manager shall prepare f inal list of documents and closure act to be digitally signed (whenever possible) by the audit manager and the audit supervisor. In case of outsourcing the audit, the audit firm shall present the full and complete electronic audit file (including physical documents only in cases mentioned above) to the Audit Authority after the end of the audit. Reporting of potential fraud cases According to audit standards , the auditors shall have sufficient knowledge to evaluate the risk of fraud and the manner in which it is managed by the organization. However, they are not expected to have the expertise of a person whose primary responsibility is detecting and investigating fraud. Based on the above, the auditor shall also evaluate probable risk of fraud when carrying out audit procedures. If the auditor has identified circumstances that may indicate a commitment of fraud, the auditor shall inform both the audit supervisor a nd the head of the Audit Authority about it. A further procedure for dealing with fraud shall be decided in co-operation with the audit supervisor and the head of the A udit A uthority with the support of the Group of Auditors . In any case, it is important to react to potential fraud quickly and appropriately, and if necessary, engage investigation authorities, the M anaging A uthority and all other competent and necessary parties in the process. Reporting of irregularities to OLAF In cases where irregularities are detected in excess of ERDF funding of EUR 10 000 and in cases where there is a suspension of payments , these shall be reported to OLAF. Follow-up activities There has been established a system to monitor the implementation of audit results . The follow-up activities related to the implementation of the recommendations laid down in the final audit report shall be performed by the A udit A uthority . They are carried out in order to obtain assurance that the errors detected have been corrected and unclear cases have been resolved or that Managing Authority has not accepted the undue risk of not taking action . If needed, the Audit Authority will carry out / outsource additional audit procedures to get the assurance that the sufficient corrective actions have been taken. If it becomes evident during the follow-up activities, that a particular recommendation laid down in the final audit report has not been followed, the audit manager shall coordinate their final opinion with the audit supervisor prior to the closure of the finding. The A udit A uthority shall collect the results of follow-up activities and provide feedback to the participating countries and the E uropean C ommission about the elimination of deficiencies outlined in audit reports. Follow-up activities are not required for recommendations related to non-significant findings. 2. SYSTEM AUDITS 2.1 Objective The objective of a system audit is to determine whether the management and control system is established in compliance and operates effectively to prevent errors and irregularities, and that, where errors and irregularities do occur, the systems are effective in detecting and correcting them. It should be possible to conclude whether the system gives a satisfactory assurance of the legality and regularity of the underlying operations and of the accuracy of the expenditure declared. System audits shall take place during the course of the Programme implementation covering at least the most important Programme authorities and functions : Managing Authority; Joint Technical Secretariat (including Branch Offices) ; Financial control function in Estonia ; Joint Monitoring Committee ( in its different functions, if necessary). The overall audit strategy foresees the coverage of all relevant areas (main implementing authorities, main final beneficiaries) throughout the whole Programming period. The selection of authorities and particular processes to be audited shall be based on the risk assessment. By conducting the risk assessment, the A udit A uthority shall also have consultations with the Members of the Group of Auditors . 2.2 Principles A system audit shall mean the determination of the objective as defined before , based on the following general principles that need to be fulfilled by the management and control system : a description of the functions of each body involved in management and control, and the allocation of functions within each body ; compliance with the principle of separation of functions between and within such bodies ; procedures for ensuring the correctness and regularity of expenditure declared ; computerized systems for accounting, for the storage and transmission of financial data and data on indicators, for monitoring and for reporting ; systems for reporting and monitoring where the body responsible entrusts execution of tasks to another body ; arrangements for auditing the functioning of the system ; systems and procedures to ensure an adequate audit trail ; the prevention, detection and correction of irregularities, including fraud, and the recovery of amounts unduly paid, together with any interest on late payments . The scope of system audits depends on the evaluation of risks during the stage of preparing the work plan and the A udit A uthority ’s overall annual audit plan. During auditing, the A udit A uthority shall evaluate the compliance of the system with the key requirements and evaluation criteria. Based on the scope of the audit, an opinion shall be given to the use of all or some key requirements and evaluation criteria. The opinion shall be declared in accordance with the following categories: Category 1. Works well. No or only minor improvement(s) needed . Category 2. Works, but some improvement(s) are needed . Category 3. Works partially; substantial improvement(s) are needed. Category 4. Essentially does not work. In the annual audit report, the A udit A uthority shall give its overall opinion on the functioning of the system of the programme as a whole, taking into account the results of audits of the current as well as previous years. The key requirements used shall be the following. Key requirement 1: Adequate separation of functions and adequate systems for reporting and monitoring where the responsible authority entrusts execution of tasks to another body (for the Managing Authority) . Key requirement 2: Appropriate selection of operations . Key requirement 3: Adequate information to beneficiaries . Key requirement 4: Adequate management verifications . Key requirement 5: Effective system in place to ensure that all documents regarding expenditure and audits are held to ensure an adequate audit trail . Key requirement 7: Effective implementation of proportionate anti-fraud measures . Key requirement 8: Appropriate procedures for drawing up the management declaration and annual summary of the final audit reports and of controls carried out . Key requirement 9: Adequate separation of functions and adequate system for reporting and monitoring where the responsible authority entrust execution of tasks to another authority (for the Certifying function of the Managing Authority) . Key requirement 10: Adequate procedures for drawing-up and submitting payment applications . Key requirement 11: Appropriate computerized records of expenditure declared and of the corresponding public contribution are maintained . Key requirement 12: Appropriate and complete account of amounts recoverable, recovered and withdrawn . Key requirement 13: Appropriate procedures for drawing up and certifying the completeness, accuracy and veracity of the accounts . Key requirement 14: Adequate separation of functions and adequate systems for ensuring that any other body that carries out audits in accordance with the programme audit strategy has the necessary functional independence and takes account of internationally accepted audit standards . Key requirement 15: Adequate system audits . Key requirement 16: Adequate audits of operations . Key requirement 17: Adequate audits of accounts . Key requirement 18: Adequate procedures for providing a reliable audit o pinion and for preparing the Annual Audit Report. Those requirements will be assessed in accordance with the assessment criteria that will be described in detail whenever a system audit based on one or more key requirements is launched. 3 PROJECT AUDITS 3.1 Definition A project audit means the auditing of projects funded from the Estonia-Russia programme. Project audits are carried out according to the audit strategy and audit plan adopted and renewed annually by the Audit Authority, on the basis of the methodology presented in this manual. The project audits are mostly carried out based on an annual sample. On the basis of the results of project audits, the Audit Authority shall provide assurance on the reliability of the accounts of the programme presented to the participating nations and the European Commission. 3.2 Obje ctive and principles The objective of the project audit is to analyze and evaluate the project’s compliance to the following principles : the operation was selected in accordance with the selection criteria for the programme, was not physically completed or fully implemented before the beneficiary submitted the application for funding under the programme, has been implemented in accordance with the approval decision and fulfilled any conditions applicable at the time of the audit concerning its functionality, use, and objectives to be attained; the expenditure declared to the participating nations and the European Commission corresponds to the accounting records and that the required supporting documentation demonstrates an adequate audit trail; for expenditure declared to the participating nations and the European Commission, outputs and results underpinning payments to the beneficiary have been delivered, participant data or other records related to outputs and results are consistent with the information submitted and that the required supporting documentation demonstrates an adequate audit trail. Thus, the objective of the project audit includes verification of: choice of project activities; implementation of project activities and outcomes ; correspondence of the financial statements of the beneficiary with the declared expenditure ; expenditure approved for payment , cost documents , documents certifying payment and other evidence; eligibility of costs as defined with the programme manual and other programme guidance . The subject of project audits is the project expenditure declared to the participating countries and the European Commission by the Managing Authority of the Estonia-Russia Programme during the reporting period as defined beforehand. The result of the project audit shall give assurance that the activities carried out and costs incurred for a project are eligible and in compliance with the requirements of the participating nations, the European Union and the programme and that they are based on the activities actually carried out under the project. Auditors are generally not able to provide a final opinion as to the fulfilment of the results of the project as a whole; however, these shall be evaluated as at the date of conducting the audit. In order to attain the objectives of the project audit, the following activities shall be analyzed and evaluated, if not otherwise possible, on spot at the beneficiary: actual fulfil l ment of the project, including its content and compatibility with the funding decision, adherence to deadlines; original documents related to the implementation of the project and certifying costs; eligibility of costs, including legality of expenditure and compliance with the objective; documents verifying the payment of costs; compliance of the accounting with requirements, including correctness of the cost documents in the beneficiary’s accounting file; legality of carrying out public procurements (compliance of public procurements with the rules of participating countries ); existence of co-financing; fulfilment of state aid rules in case of projects carried out in Estonia; fulfilment of publicity rules; existence and preservation of investments co-financed from the p rogramme. 4. Audit of accounts 4.1 Definition Audit of accounts means auditing of certified accounts provided by the Certifying Authority function of the Managing Authority to the Audit Authority. These verifications are aimed to confirm that all the required elements are correctly included in the accounts and supported by underlying accounting records. 4.2 Objective, subject and scope The audit of accounts should provide reasonable assurance on the completeness, accuracy and veracity of the amounts declared in the accounts. Based on the accounts provided by the Certifying Authority function, the Audit Authority shall verify that: the total amount of eligible expenditure declared reconciles with the expenditure (and the corresponding public contribution) included in the final payment application submitted to the participating nations and the European Commission for the relevant accounting year; the amounts withdrawn and recovered during the accounting year, the amounts to be recovered as at the end of the accounting year, the recoveries effected, and the irrecoverable amounts presented in the accounts, all correspond to the amounts entered in the accounting systems and are based on reasoned decisions taken by the Managing Authority; expenditure has been excluded from the accounts, where applicable, due to an ongoing assessment of its legality and regularity. The Audit Authority also verifies on the basis of a sample, that all other required corrections as a result of management verifications or audits were correctly reflected in the accounts for the accounting year concerned; the amounts of advances of state aid paid to beneficiaries are supported by the information available from the Joint Technical Secretariat and Managing Authority. 5 AUDIT PROCEDURES Audit procedures shall include: planning the audit; conducting the audit; preparation of the audit report (preliminary and final) ; communicating the audit results (preliminary and final audit report). As there are two types of audits to be performed (system and project audit), some of the procedures may vary during execution but the core principles remain the same for both. In case of system audits, audit planning procedures are performed mainly by the Audit Authority and in case of project audits, they are performed independently by the auditors conducting them. The auditors develop and document a plan for each engagement, including the engagement objectives, scope, timing, and resource allocations. In case of both project and system audits the auditee is generally notified at least 10 working days in advance before the on-the-spot visit. All engagement procedures and their documentation have to be prepared according to the selected auditing standards. The auditors conducting the audits are liable for preparing all the documentation relevant to the engagement in their responsibility and they prepare it independently of the Audit Authority. 5.1 Planning an audit 5.1.1Registration of the audit and collection of background information After registration of the audit in their own working system , auditors shall collect background information related to the audit, using document registers and databases available (e.g. eMS for the programme; SFOS and public procurement register in Estonia , etc.) as well as legislation regulating granting of aid. Auditors shall collect this background information in the audit file. 5.1.2 Audit plan and programme An audit plan shall be prepared at the start of the audit to achieve the engagement objectives and providing an overview of the key phases of conducting the audit and the deadlines for each phase . The audit plan s hall continuously be monitored. An audit plan and programme shall contain the following information : name of audit (name of the audited institution or process ); audit objective and audit sub-objectives, which should reflect the results of risk assessment; audit scope; audit stages, procedures, planned and (actual) dates of fulfil l ment; persons carrying out audit procedures; references to working papers. Adjustments may be made to the audit plan and programme during the audit, but they need to be approved with t he audit supervisor. The reason for making adjustments shall be described in the box “Comments” of the audit plan/programme. The audit supervisor shall digitally sign the final version of the audit plan after completion of all planned audits, and at the latest at the end of each reporting year when all audits have been finalized . The signed audit plan shall present actual dates for carrying out audit procedures and if necessary, explanations by the audit supervisor whenever there are significant deviations from the original schedule. In case the audit population exceeds 300 objects and it would be unreasonable to audit all of these, subsampling may be used. The sub-sampling will be used using the same principles, as used for sampling the projects to be audited. The process shall be documented in an audit working paper describing all steps for compiling the sub-sample and signed by the audit manager and supervisor; as well as the A udit A uthority . 5.1.3 Preparation of an audit announcement letter In case of system audits, the A udit A uthority shall send a written audit announ cement letter to the auditee. I n case of project audits, the auditors conducting them shall themselves send the audit announcement letter to the auditee. The purpose of the announcement letter is to inform the beneficiary of the upcoming audit and enable the m to designate a contact person. The announcement letter shall be sent at least 10 working days prior to the launch of on-the-spot audit procedures. 5.2 Conducting an audit Audit procedures shall be carried out according to the audit plan and programme and they shall result in a sufficient amount of evidence to fulfil l the objective of the audit and reach the conclusions. The person performing a certain procedure shall be responsible for carrying out the procedures and documenting information. 5.2.1 Audit procedures and documentation of information In accordance with audit standards auditors must identify, analyze, evaluate, and document sufficient information to achieve the engagement's objectives . Audit procedures shall generally be performed on-the-spot at the auditee ’s . If necessary, minutes shall be taken at the meeting with the auditee (A nnex 2). If the minutes contain information about the standpoints of the auditee, it should be verified by the auditee in order to confirm the correctness of information. Thereafter, the minutes shall be signed by the person preparing them, and they shall be saved in the audit file. In order to obtain assurance about the conclusions reached, the audit team members may obtain expert opinion or receive legal advice from third parties. During the audit procedures, auditors shall collect necessary evidence and prepare audit check-lists (Annexes 3 and 4). 5.2.2.1 Preparation of audit checklists Special check-lists have been prepared to help auditors to meet the objective of a project audit (Annexes 3 and 4). The list of questions in the check-list is not all-inclusive and it may be supplemented depending on a particular beneficiary and conditions of the respective project. If necessary, auditors shall prepare additional check-lists or additional working papers to obtain answers to the questions in the general check-list. The comparison check-list (Annex 3) is a tool for auditors to compare the cost documents available in the project database eMS with those available at the beneficiary and it shall be filled in for all project audits . It is important to keep in mind that the audit file should contain a list of cost documents that auditors actually checked during the audit. The comparison check-list should contain references to the respective expenses in the public procurement checklist or notes regarding verification of procurements that are under the public procurement threshold. The general project audit checklist (Annex 4) where questions have been grouped according to the objectives of the project audit shall also be fi lled in for all project audits. A public procurement checklist shall be filled in to check public procurements for all audits which include them . The check-lists to be used to evaluate the correctness of the public pr ocurements shall be prepared in accordance with the public procurement law in both respective participating nations (for Russian Federation, Annex 7) . For identification of the cost of a public procurement, note should be taken of the project budget, procurement contract, goods and services previously purchased by the beneficiary and earlier public procurements that could be related to the public procurement within the audit scope ( in order to identify splitting, correct ch oice of procurement type, etc.). For public procurements under the threshold for public procurement, auditors shall assess whether they are in compliance with the general principles of public procurements. This rule shall not be assessed for the purchases with the cost less than €5000. If there are additional conditions laid down in the programme manual for purchases of services and goods, they shall also be taken into account and related comments shall be added to the general checklist or procedure working paper. Check-lists shall be informative to the most comprehensive extent possible. The options include “yes”, “no” or “N/A” and comments should be added to the comments section. Comments should include information about how a particular conclusion was reached and a reference to the source/evidence or the procedure working paper (i.e. it is sufficient to refer to the working paper if details are provided therein ) . If the answer to a question is positive, the auditor shall also add a short explanation to the respective box (e.g. which documents were checked or reference to the working paper ). The filled-in working papers shall be kept electronically in the audit file. Check-lists shall be digitally signed by the auditor who filled in the check-list, the audit manager and the audit supervisor. 5.2.2.2 Compilation of findings The shortcomings and deficiencies identified during the audit procedures shall be formulated as audit findings, using the audit working papers as the basis. The compilation of findings includes the description of findings, related risks and recommendations. The content of the finding shall describe the current situation, its deviation from the desired situation and the reason why the current situation deviates from the desired situation. The risks related to the finding shall also be outlined and a specific and applicable recommendation to correct the deficiency and reach the desired outcome shall be added. The findings shall be as concise, short and specific as possible. When auditors detect ineligible expenditure, a recommendation shall be made to the Managing Authority to reclaim it and deduct ineligible co-financing from the cost of the project. When ineligible expenditure is found outside the scope of the audit period, a recommendation shall be made to reclaim this amount as well . A concise heading shall be added to the findings, briefly and accurately describing the content of the finding. It shall also include the amount of ineligible expenditure detected. When ineligible expenditure is detected outside the audit scope, these shall also be stated in the heading of the finding. Findings shall be verifiable and reasonable. When a certain problem cannot be analyzed until a final conclusion is reached (e.g. when wrongly calculated taxes have been re- calculated using a formula), a risk shall be identified and a recommendation shall be made how to deal with the problem. Whenever the finding has a financial impact, i.e. loss in monetary terms, it shall be outlined in the finding. Findings shall be grouped in the audit report by topics, e.g. by budget lines . Setup of a finding: Criteria – standards, measures, expected situation, reference to legislation. Condition – factual evidence of the current situation. Cause – reason that has led to the difference in the expected and actual situation. Conclusion – summary of the nature of the problem identified (difference between the criteria and situation identified). Risk: Risk – threat of occurrence of an event that may have a negative impact on the attainment of goals. If risk has realized (e.g. ineligible cost has been incurred), it is not necessary to outline it in the finding and it is sufficient to describe the circumstances identified. Effect – (potential) financial loss from the realization of risk. Recommendation: Recommendations to improve the situation and/or activities. 5.2.2.3 List of documents and closure report Prior to the closure of the audit file, the audit manager shall prepare a final list of documents for the documents added to the electronic audit file (Annex 6). If documents have been received on paper, they shall be scanned and added to the electronic audit file. 5.3 Preparation of the audit report 5.3.1 Preparation of the preliminary audit report The audit manager shall prepare the preliminary audit report (Annex 5), using the list of findings and/or evidence in the audit file. The audit report should include audit objectives, scope, and results . It is advisable to keep the project audit short, accurate, objective, clear, constructive, complete, timely and concise, based on facts . Significant findings with a financial impact should be given the greatest weight, followed by non-significant findings. If there are no findings related to some areas, the auditors should acknowledge satisfactory performance and respective information shall be disclosed in the audit report as a positive statement . In the audit report the auditors’ opinion should be provided - t he project or system audit may be classified into the following categories: no findings; non-significant findings (there are only non-significant findings in the final report); significant findings (there are significant findings in the final report, i.e. auditors have detected ineligible expenditure). Auditors shall not disclose the findings made during the audit to third parties prior to issuing the audit report. 5.3.2 Coordination of the preliminary audit report The audit manager shall first coordinate the preliminary audit report with the audit work group and then with the audit supervisor. Thereafter, the audit manager shall finalize the preliminary audit report and send it to the auditee for comments. When the audit is outsourced, the auditors conducting it will send it to the Audit Authority for a review before sending it to the auditee . Whenever the audit is conducted in Russian Federation, the Russian Member of the Group of Auditors will be consulted as well at this point. The auditee is asked to add comments to the preliminary audit report electronically (preferably directly in the respective space available in Part B of the report form ) during up to ten working days from the date of send ing out the preliminary audit report. The comments made by the auditee together with the preliminary audit report shall be saved in the audit file. The auditee’s unaltered comments (incl uding the date for implementing recommendations and the person responsible for it) shall be added to the final report after the respective findings, risks and recommendations. Auditors may add final clarifications to the preliminary audit report. In case the auditors and the auditee disagree about the audit findings, the audit manager shall contact the A udit A uthority to resolve the disagreement and if needed, the A udit A uthority will engage the M anaging A uthority and other necessary programme bodies in it. In case meetings have been held during the reconciliation of the audit preliminary report and findings, minutes shall be taken from the meetings to maintain the audit trail. Minutes shall be signed by the person preparing it, the audit manager and the audit supervisor. 5.3.3 Preparation of the final audit report The audit manager shall prepare the final audit report on the basis of the preliminary audit report and the comments received from the auditee, adding, if necessary, supplementary information from the minutes of the meeting or any other source obtained at this point . The final audit report shall be signed by the audit manager and the audit supervisor, thereby certifying that the information presented in the report is correct. 5.3.3.1 Errors and omissions in the final audit report If the final audit report contains a major error or omission, the audit manager shall immediately correct it upon becoming aware of it and submit the corrected information to all parties who received the original final audit report . The corrected and signed audit report shall be sent to the recipients in the same manner as the earlier version (i.e. electronically or as a paper version) as of the date of the respective change. A cover letter shall be also added to the final report, with references to the respective errors or omissions. The corrected final report and cover letter shall be kept in the audit file. 5.4. Communication of audit results The audit report should b e communicated to the appropriate parties . The final audit report shall be sent to the auditee within 5 working days from the date of signing it. In case of system audits, the final audit report shall be sent to the auditee by the A udit A uthority and in case of the project audits, by auditors conducting that audit . The final file of the audit report shall be signed digitally. If necessary, the final audit report shall be sent to other persons involved in the aud ited topic as well as the Managing Authority, whose role is to follow up financial correc tions to be made and system ic errors. System audits shall be performed and reported to the participating countries as well as the E uropean Commission regularly during the Programme period. All audit findings shall be included in the Annual Audit Report. The A udit A uthority shall establish whether any problems encountered are of a systemic character. If so, suggestions on financial corrections or amendments to the management and control system in general shall be made accordingly and necessary preventive or corrective action shall be taken by relevant national and Programme authorities. The A udit A uthority shall make sure that the audit work mentioned above is documented in an appropriate manner and kept available for at least three years following the closure of the Programme. ANNEXES TO THE MANUAL Annexes: Annex 1 – Audit plan and Declaration of objectivity Annex 2 – Summary of audit procedures (working paper) Annex 3 – Comparison check-list Annex 4 – G eneral project audit check - list Annex 5 – Audit report form Annex 6 – Guidance for preparing the list of documents Annex 7 – Check-list for public procurements conducted in Russian Federation Hankeleping „Perioodi 2014–2020 Eesti-Vene CBC programmi Vene Föderatsiooni projektiauditite tellimine Rahandusministeeriumile“ (225932) TÖÖVÕTULEPING NR 9.2-13.5.12/7918-1 Rahandusministeerium (edaspidi tellija), registrikood 70000272, asukoht Suur-Ameerika 1, 10122 Tallinn, mida esindab 05.04.2017 käskkirja nr 64 „Volituste andmine” alusel kantsler Veiko Tali; Riigi Tugiteenuste Keskus (edaspidi maksja), registrikood 70007340, asukoht Lõkke 4, 10122 Tallinn, mida esindab põhimääruse alusel peadirektor Tarmo Leppoja; ja Ernst & Young Baltic AS (edaspidi töövõtja), registrikood 10877299, asukoht Rävala 4 10143 Tallinn, mida esindab juhatuse liige Olesia Abramova; edaspidi koos pooled või eraldi pool, sõlmisid käesoleva töövõtulepingu (edaspidi leping) alljärgnevas: 1. Üldsätted 1.1. Leping on sõlmitud riigihankes „Perioodi 2014–2020 Eesti-Vene CBC programmi Vene Föderatsiooni projektiauditite tellimine Rahandusministeeriumile“ (viitenumber 225932) (edaspidi riigihange). 1.2. Lepingu lahutamatud osad on riigihanke alusdokumendid, töövõtja pakkumus, poolte vahelised kirjalikud teated ning lepingu muudatused ja lisad. Vastuolude korral riigihanke alusdokumentide ja töövõtja pakkumuse vahel lähtutakse riigihanke alusdokumentides sätestatust. 1.3. Lepingul on selle sõlmimise hetkel järgmised lisad: 1.3.1. Lisa 1- Tehniline kirjeldus 1.3.2. Lisa 2 - Projektiauditi käsiraamat 2. Lepingu ese 2.1. Riigihanke esemeks on perioodi 2014–2020 Eesti-Vene CBC programmi Vene Föderatsiooni territooriumil asuvate partnerite projektiauditite tellimine (edaspidi töö). 2.2. Töö täpsem kirjeldus ja tööle esitatavad nõuded toodud riigihanke alusdokumentides. 2.3. Töö tellitakse ja rahastatakse perioodi 2014–2020 Eesti-Vene CBC programmi tehnilisest abist. 3. Lepingu hind ja tasumise tingimused 3.1.Maksja tasub töövõtjale tehtud töö eest vastavalt pakkumuses fikseeritud hinnale (ühe projektiauditi hind) 4607,00 eurot (edaspidi lepingu hind). Lepingu hinnale lisandub käibemaks õigusaktidega ettenähtud korras. 3.2. Lepingu hind sisaldab kõiki kulusid, mida töövõtja on teinud töö teostamiseks, sh autoritasusid ning täiendavaid kulusid ei hüvitata. 3.3. Maksja tasub töö eest pärast iga eraldiseisva projektiauditi tellija ja maksja volitatud esindajate poolt kinnitatud üleandmise-vastuvõtmise akti vastuvõtmist esitatud nõuetekohase arve alusel. 3.4. Töövõtja esitab maksjale arve e-arvena. Arvele tuleb märkida riigihanke viitenumber 225932 3.5. E-arve saatmise võimalused on: 1 3.5.1. kui töövõtja on e-arvete operaatori klient, tuleb e-arve edastada oma e-arvete operaatorile, kelle kaudu see jõuab maksjani. 3.5.2. e-arvet saab saata tasuta maksjale, kasutades e-arveldaja infosüsteemi (http://www.rik.ee/et/e-arveldaja). Selleks on vaja avada e-arveldaja infosüsteemis kasutaja konto ja sisestada konkreetne maksjale suunatud arve sellesse infosüsteemi maksja e-arvete operaatorile edastamiseks. 3.5.3. e-arvet saab saata tasuta arved.ee infosüsteemi kaudu (https://www.arved.ee). Selleks on vaja avada arved.ee infosüsteemis kasutaja konto ja sisestada konkreetne maksjale suunatud arve sellesse infosüsteemi maksja e-arvete operaatorile edastamiseks. 3.5.4. Töövõtja, kes ei ole registreeritud Eestis, saab arve esitada e-arvena üle- Euroopalise elektrooniliste dokumentide ja e-arvelduse võrgustiku PEPPOL kaudu või PDF-vormingus maksja volitatud esindaja e-posti aadressile. 3.6. Arve maksetähtaeg peab olema vähemalt 14 tööpäeva nõuetekohase arve esitamisest. 4. Töö teostamine 4.1. Töid teostatakse pärast lepingu jõustumist eeldatavalt 40 kuud, kuid mitte kauem kui 31.12.2023 vastavalt tehnilises kirjelduses kehtestatud nõuetele, sh vastavalt tehnilises kirjelduses nimetatud metoodikale ja standarditele. 4.2. Töövõtja kohustub täitma lepingu tähtaegselt, kvaliteetselt, kooskõlas riigihanke alusdokumentide ja esitatud pakkumusega. Riigihanke alusdokumentides määratlemata omaduste osas peab töö olema vähemalt keskmise kvaliteediga ja vastama sarnastele töödele tavaliselt esitatavatele nõuetele. Töövõtja teostab kõik tööd ja toimingud, mis ei ole lepingus, selle lisades ja riigihanke alusdokumentides sätestatud, kuid mis oma olemuselt kuuluvad lepingu täitmisega seotud tööde hulka. 4.3. Töövõtja on kohustatud töö teostamisel järgima töö rahastaja tingimusi, sh kohustub kasutama Eesti-Vene CBC programmi 2014-2020 nõutud sümboolikat ning nõustuma asjaoluga, et auditite lõpparuanded avalikustatakse Rahandusministeeriumi koduleheküljel. 4.4. Töövõtja peab tegema töö vastavalt oma erialastele teadmistele, oskustele ja võimetele, kasutades lepingus sätestatud töö tegemisel tööjõudu, kelle koolitus, oskused ja kogemused vastavad töö ulatusele, iseloomule ja keerukusele. Töövõtja peab tagama, et töö teevad pakkumuses nimetatud meeskonnaliikmeid vastavalt oma erialastele teadmistele, oskustele ja võimetele. 4.5. Töövõtja kohustub tööde teostamisel kasutama samu isikuid, keda ta esitas riigihanke pakkumuse koosseisus. Meeskonnaliikmete vahetumise korral peab olema tagatud, et töid teostavad vähemalt riigihanke alusdokumentides nõutud kvalifikatsiooni ja kogemusega isikud. Meeskonnaliikme vahetumise vajadustest tuleb teavitada tellijat esimesel võimalusel ning esitada tellijale uue meeskonnaliikme kvalifikatsiooni ja töökogemust kajastavad dokumendid. Meeskonnaliikmete vahetamiseks on vajalik tellija poolne nõusolek. 4.6. Töövõtja tagab kogu hankelepingu ajal riigihanke alusdokumentides nõutud koostööpartneri olemasolu Vene Föderatsioonis. Koostööpartneri vahetumise korral peab uus koostööpartner vastama samadele tingimustele. Koostööpartneri vahetumise vajadustest tuleb teavitada tellijat esimesel võimalusel ning esitada tellijale uue koostööpartneri nõuetele vastavust tõendavad dokumendid. 4.7. Töövõtja tagab, et hankelepingu täitmisel osalevad isikud valdavad inglise ja vene keelt hankelepingu täitmiseks vajalikul tasemel. Suhtlus tellijaga toimub eesti keeles, põhjendatud vajadusel inglise keeles. Juhul, kui töövõtja esindaja ei valda eesti keelt tellijaga suhtlemiseks piisaval tasemel ning tellija peab vajalikuks suhtlemist eesti keeles, 2 peab töövõtja tagama omal kulul tõlke olemasolu suuliseks ja kirjalikuks suhtlemiseks töövõtja ja muude isikute vahel. Tõlk peab olema kompetentne lepingu eseme tehnilise teksti tõlkimisel. 4.8. Töövõtja kohustub teenuse osutamise tingimustest informeerima oma töötajaid, kellele ta lepingu täitmisega seotud ülesande on pannud ja koostööpartnereid, kes on kaasatud lepinguga seotud ülesannete täitmisse. 4.9. Töövõtja tagab, et tal on lepingu täitmise perioodil olemas kõik vajalikud sertifikaadid, litsentsid, load, registreeringud ja nõusolekud, kui need on õigusaktidest või riigihanke alusdokumentidest tulenevalt vajalikud või vastava töö puhul nende olemasolu eeldatakse. 4.10. Tellija edastab töövõtjale võimalikult palju andmeid iga auditeerimisele kuuluva projekti kohta, sh auditi alusdokumendid. Väiksem osa auditi alus- ja täiendavatest dokumentidest võivad olla töövõtja jaoks kättesaadavad ainult auditi kohapealsete toimingute käigus Vene Föderatsiooni territooriumil. 4.11. Tellijal on õigus anda töövõtjale juhiseid ja teha märkusi töö nõuetekohaseks teostamiseks. Tellija juhised, märkused ja ettepanekud on töövõtjale täitmiseks kohustuslikud, kui ta ei esita kolme tööpäeva jooksul neile vastuväiteid koos põhjendustega. Vastuväidete esitamisel teeb lõpliku otsuse tellija. 4.12. Pooled on kohustatud teavitama teist poolt viivitamatult asjaoludest, mis takistavad või võivad takistada kohustuse nõuetekohast ja õigeaegset täitmist. 4.12.1. Töövõtja on kohustatud kontrollima tellija poolt töö teostamiseks antud juhiste/materjalide sobivust. Mittesobivusel tuleb sellest tellijat teavitada. Mittesobivusest teavitamata jätmisel vastutab töövõtja valminud töö lepingutingimustele mittevastavuse eest. 4.12.2. Kui töövõtja teeb töö kolmandate isikute läbiviidud tööde jätkuna või tuginedes kolmandate isikute koostatud eeltöödele või andmetele, on ta kohustatud kontrollima eeltööde ja andmete sobivust ja vastavust. Mittesobivusel tuleb sellest tellijat teavitada. Mittesobivusest teavitamata jätmisel vastutab töövõtja valminud töö lepingutingimustele mittevastavuse eest. 4.12.3. Töövõtja on kohustatud viivitamatult teavitama tellijat, kui tal on suhtluses auditeeritavatega tõrkeid ja need võivad takistada töö nõuetekohast ja õigeaegset täitmist. 4.13. Kui töös on puudusi, on tellijal õigus esitada pretensioon ja/või parandusettepanekud 14 kalendripäeva jooksul. Tellija määrab puuduste kõrvaldamiseks mõistliku tähtaja, arvestades tehnilises kirjelduses nimetatud tähtaegasid. 4.13.1. Pretensioonis fikseeritakse ilmnenud puudused ja määratakse tähtaeg puuduste kõrvaldamiseks. Tellija võib nõuda puudustega töö parandamist või uue töö tegemist, kui sellega ei põhjustata töövõtjale ebamõistlikke kulusid või põhjendamatuid ebamugavusi. Kui töövõtja rikub lepingust tulenevat kohustust, mille heastamine ei ole võimalik või kui tellijal ei ole heastamise vastu huvi, tähtaega puuduste kõrvaldamiseks ei määrata. 4.13.2. Tellijal ei ole õigust esitada pretensiooni, kui puudused töö kvaliteedis olid tingitud tellija poolt antud materjali või juhiste ebasobivusest või puudustest eeltöödes ning töövõtja oli tellijat sellest teavitanud vastavalt lepingus sätestatule. 4.13.3. Kui töövõtja ei ole pretensiooniga nõus, on töövõtjal õigus tellida töö vastavuse hindamiseks ekspertiis mõlema poole poolt aktsepteeritud sõltumatult eksperdilt. Töö vastuvõtmisest keeldumine osutub ekspertiisi tulemusel põhjendamatuks, hüvitab tellija töövõtjale ekspertiisikulud. Kui ekspertiis kinnitab tööde mittevastavust, jäävad ekspertiisikulud töövõtja kanda. 3 4.14. Kui tellija ei esita pretensiooni ja/või parandusettepanekuid lepingu punktis 4.12. määratud tähtaja jooksul, loetakse töö tellija poolt vastuvõetuks. 4.15. Erakorraliste auditite tellimuse täitmise ja tingimused lepivad pooled eraldi kokku. 5. Õiguskaitsevahendid, poolte vastutus ja vääramatu jõud 5.1. Lepingust tulenevate kohustuste täitmata jätmise või mittekohase täitmisega teisele poolele tekitatud otsese varalise kahju eest kannavad pooled täielikku vastutust selle kahju ulatuses. Sealhulgas vastutavad pooled isikute tegevuse eest, keda nad kasutavad oma õiguste teostamisel ja kohustuste täitmisel. 5.2. Töövõtja vastutab igasuguse lepingurikkumise eest, eelkõige kui töövõtja ei ole lepingut täitnud, töö ei ole tähtaegselt teostatud või kui töö ei vasta lepingus sätestatud nõuetele vms. Kui sama rikkumise eest on võimalik nõuda leppetrahvi mitme sätte alusel või sama rikkumise eest on võimalik kohaldada erinevaid õiguskaitsevahendeid, valib õiguskaitsevahendi tellija. Leppetrahvi nõudmine ei mõjuta õigust nõuda täiendavalt ka kohustuste täitmist ja kahju hüvitamist. 5.3. Lisaks lepingu täitmise nõudele või täitmisnõude asemel on tellijal õigus nõuda leppetrahvi kuni 3% lepingu hinnast iga rikkumise eest, kui töövõtja ei ole tööd teinud või töövõtja poolt üle antud töö ei vasta lepingutingimustele. 5.4. Lepingus sätestatud töö teostamise tähtajast või pretensioonis määratud tähtajast mittekinnipidamise korral on tellijal õigus nõuda töövõtjalt leppetrahvi 0,05% lepingu maksumusest iga viivitatud päeva eest. 5.5. Lepingus sätestatud konfidentsiaalsuskohustuse rikkumise eest töövõtja või punktis 8.4 nimetatud isikute poolt, on tellijal õigus nõuda töövõtjalt leppetrahvi kuni 10% lepingu hinnast ja/või leping erakorraliselt üles öelda. 5.6. Kui töövõtja ei täida lepinguga võetud kohustusi, ei paranda puudustega tööd või ei tee uut tööd puudustega töö asemel ja töövõtja viivitust saab lugeda oluliseks lepingurikkumiseks, on tellijal õigus leping erakorraliselt üles öelda. 5.7. Tellijal on õigus puuduste kõrvaldamise nõude asemel alandada lepingu hinda. 5.8. Kui tellija viivitab lepingus sätestatud rahaliste kohustuste täitmisega, on töövõtjal õigus nõuda tellijalt viivist 0,05% tähtaegselt tasumata summalt päevas, kuid mitte rohkem kui 5% lepingu hinnast. 5.9. Lepingus sätestatud kohustuste mittetäitmise või mittenõuetekohase täitmise korral, kui neid saab lugeda oluliseks lepingurikkumiseks, on tellijal õigus leping erakorraliselt ühepoolselt üles öelda, teatades sellest töövõtjale kirjalikus vormis avaldusega. Lepingu rikkumist loetakse oluliseks eelkõige VÕS § 116 lg 2 ja § 647 kirjeldatud asjaoludel. 5.10. Leppetrahvid ja viivised tuleb tasuda 14 päeva jooksul vastava nõude saamisest. Tellijal on õigus töö eest tasumisel tasaarveldada leppetrahvi summa lepingu alusel tasumisele kuuluva summaga. 5.11. Pooled ei vastuta oma lepingust või õigusaktidest tuleneva kohustuse rikkumise eest, kui kohustuse rikkumise põhjustas vääramatu jõud. Vääramatuks jõuks loevad pooled võlaõigusseaduse § 103 lg 2 kirjeldatud ettenägematuid olukordi ja sündmusi, mis ei olene nende tahtest või muid sündmuseid, mida Eestis kehtiv õigus- ja kohtupraktika tunnistab vääramatu jõuna. 5.11.1. Kui lepingu täitmine on takistatud vääramatu jõu asjaolude tõttu, lükkuvad töö teostamise tähtajad edasi vääramatu jõu mõju kehtivuse aja võrra. 5.11.2. Punktis 5.11. nimetatud vääramatu jõuna ei käsitleta pakkumuste esitamise tähtpäeva seisuga koroonaviiruse (haigus COVID-19) leviku tõkestamiseks õigusaktidega kehtestatud piiranguid. Vääramatu jõu kohaldumise üheks eelduseks on asjaolu ettenägematus. Pakkumuste esitamise tähtpäeva seisuga kehtivad piirangud olid lepingu pooltele teada ning kõik tegevused planeeritakse 4 arvestades pakkumuste esitamise tähtpäeva seisuga kehtiva olukorraga. Kui viiruse leviku tõkestamiseks kehtestatakse täiendavad piirangud, mis takistavad lepingu täitmist, on poolel õigus tugineda vääramatule jõule. 6. Autoriõigused 6.1. Lepingu alusel töövõtja poolt loodud või tema poolt kolmandatelt isikutelt omandatud ja lepingu alusel tellija poolt vastuvõetud ning tasutud mistahes tööde resultaadid ja nendega seotud intellektuaalse omandi õigused, sh autori kõik varalised õigused lähevad materjalide vastuvõtmisega täies mahus üle tellijale ning materjalide suhtes kehtivate autori isiklike õiguste osas (mis oma olemuselt üle antavad ei ole) annab töövõtja tellijale arvates materjalide üleandmisest tagasi võtmatu kogu autoriõiguste kehtivuse aja territoriaalsete piiranguteta kehtiva lihtlitsentsi ja õiguse anda all-litsentse kolmandatele isikutele enda äranägemisel. 6.2. Töövõtja kohustub andma tellijale üle andmed kolmandate isikute intellektuaalse omandi õiguste kohta seoses talle tööde teostamise käigus üle antud materjalidega. Töövõtja kohustub tagama, et tal on kõik õigused eelpool nimetatud viisil varalised õigused loovutada ja isiklike õiguste osas litsents anda. 6.3. Tellijal on pärast lepingu täitmise käigus loodud teose üleandmist õigus kasutada teost oma äranägemisel. Teose kasutamise periood, viis ega territoorium ei ole piiratud (sh õigus kasutada internetikeskkonnas). Teose muudatuste puhul peab olema selgelt aru saada, et nende autoriks ei ole töövõtja. Kui see ei ole selge, peab tellija töövõtjat eelnevalt teavitama ning andma töövõtjale võimaluse nõuda oma nime eemaldamist töö tulemitelt. 6.4. Töövõtjal ei ole ilma tellija eelneva kirjaliku nõusolekuta õigust lepingu täitmise käigus loodud teoseid või nende osasid kasutada. 6.5. Töövõtja kohustub talle töö eest maksmisele kuuluva tasu arvelt tasuma vajadusel kolmandatele isikutele töö teostamisega seotud autoritasud. 6.6. Juhul kui tellija vastu esitatakse nõue tööde tegemisel toimunud autoriõiguste rikkumise tõttu, vastutab tellijale tekkinud kahju eest töövõtja. 7. Teadete edastamine ja volitatud esindajad 7.1. Teadete edastamine toimub üldjuhul kirjalikku taasesitamist võimaldavas vormis. Juhul kui teate edastamisel on olulised õiguslikud tagajärjed, peavad teisele poolele edastatavad teated olema edastatud kirjalikus vormis, muuhulgas poolte lepingu lõpetamise avaldused, samuti poole nõue teisele poolele, mis esitatakse tulenevalt lepingu rikkumisest jms. Kirjaliku vormiga on võrdsustatud digitaalselt allkirjastatud vorm. 7.2. Lepinguga seotud teated edastatakse teisele poolele lepingus märgitud kontaktandmetel. Kontaktandmete muutusest on pool kohustatud koheselt informeerima teist poolt. Kuni kontaktandmete muutusest teavitamiseni loetakse teade nõuetekohaselt edastatuks, kui see on saadetud poolele lepingus märgitud kontaktandmetel. 7.3. Kirjalik teade loetakse poole poolt kätte saaduks, kui see on üle antud allkirja vastu või kui teade on saadetud postiasutuse poolt tähitud kirjaga poole poolt teatatud aadressil ja postitamisest on möödunud viis kalendripäeva. E-posti teel, sh digitaalselt allkirjastatud dokumentide, saatmise korral loetakse teade kätte saaduks e-kirjas näidatud saatmise kellaajal. 7.4. Poolte volitatud esindajad lepingu täitmisega seotud küsimustes on: 7.4.1. Tellija esindaja on Kaur Siruli, tel +372 611 3449, e-post [email protected]. Tellija volitatud esindajal on õigus esindada tellijat kõikides lepingu täitmisega seotud küsimustes, v.a lepingu muutmine, lepingu ühepoolne erakorraline lõpetamine ning leppetrahvi, viivise või kahjude hüvitamise nõude esitamine. 5 7.4.2. Maksja esindaja on Ege Ello, tel +372 663 1933, e-post [email protected]. 7.4.3. Töövõtja esindaja on Viktoria Koljagina, tel +372 611 4606, e-post [email protected]. 7.5. Pooled võivad põhjendatud vajaduse korral lepingu täitmise käigus volitatud esindajate andmeid muuta, teavitades sellest teist poolt e-posti teel ning kontaktandmete muutmist ei käsitleta lepingu muudatusena. Kuni kontaktandmete muutusest teavitamiseni loetakse teade nõuetekohaselt edastatuks, kui see on saadetud poolele lepingus märgitud kontaktandmetel. 8. Konfidentsiaalsus ja andmekaitse 8.1. Töövõtja kohustub lepingu kehtivuse ajal ning pärast lepingu lõppemist määramata tähtaja jooksul hoidma konfidentsiaalsena kõiki talle seoses lepingu täitmisega teatavaks saanud andmeid, mille konfidentsiaalsena hoidmise vastu on tellijal eeldatavalt õigustatud huvi. 8.2. Konfidentsiaalse informatsiooni avaldamine kolmandatele isikutele on lubatud vaid tellija eelneval kirjalikku taasesitamist võimaldavas vormis antud nõusolekul. Lepingus sätestatud konfidentsiaalsuse nõue ei laiene informatsiooni avaldamisele poolte audiitoritele, advokaatidele, pankadele, kindlustusandjatele, teistele töövõtja ülemaailmsesse võrgustikku kuuluvale juriidilisele isikule või seltsingutele, allhankijatele või teenusepakkujatele, kes on seotud konfidentsiaalsuskohustusega, ning juhtudel, kui pool on õigusaktidest tulenevalt kohustatud informatsiooni avaldama. 8.3. Töövõtja kohustub mitte kasutama konfidentsiaalset teavet isikliku kasu saamise eesmärgil või kolmandate isikute huvides. 8.4. Töövõtja kohustub tagama, et tema esindajad, töötajad, lepingupartnerid ning muud isikud, keda ta oma kohustuste täitmisel kasutab, oleksid käesolevas lepingus sätestatud konfidentsiaalsuse kohustusest teadlikud ning nõudma nimetatud isikutelt selle kohustuse tingimusteta ja tähtajatut täitmist. 8.5. Töövõtja kohustub tagama lepingu täitmise käigus isikuandmete töötlemise õiguspärasuse ning vastavuse isikuandmete kaitse üldmääruses (EL 2016/679) ja teistes andmekaitse õigusaktides sätestatud nõuetele, sh täitma organisatsioonilisi, füüsilisi ja infotehnoloogilisi turvameetmeid konfidentsiaalsete andmete kaitseks juhusliku või tahtliku volitamata muutmise, juhusliku hävimise, tahtliku hävitamise, avalikustamise jms eest. 9. Lepingu kehtivus, muutmine ja lõpetamine 9.1. Leping jõustub poolte poolt allkirjastamisest ja kehtib kuni lepinguliste kohustuste täitmiseni arvestades riigihanke alusdokumentides nimetatud tähtaegu. Lepingu lõppemine ei mõjuta selliste kohustuste täitmist, mis oma olemuse tõttu kehtivad ka pärast lepingu lõppemist. 9.2. Kumbki pool ei tohi lepingust tulenevaid õigusi ega kohustusi üle anda ega muul viisil loovutada kolmandale isikule ilma teise poole eelneva kirjaliku nõusolekuta. 9.3. Tellijal on õigus leping mõjuva põhjuse olemasolul ennetähtaegselt üles öelda, eelkõige kui tal puuduvad lepingu täitmiseks rahalised vahendid või kaob vajadus töö teostamise järele. Tellija teatab töövõtjale sellest kirjalikult ette vähemalt 2 kalendrikuud. Sellisel juhul tasutakse töövõtjale selleks ajaks reaalselt teostatud tööde eest. 9.4. Tellijal on õigus leping ühepoolselt üles öelda, kui töövõtjal puuduvad õigusaktides nõutud kehtivad sertifikaadid, litsentsid, load, registreeringud või nõusolekud. 9.5. Kui lepingu täitmise ajal jätkub koroonaviiruse (haigus COVID-19) puhang ja levik või esinevad muud inimeste tervise ja ohutu elukeskkonna tagamise vajadusest tingitud 6 põhjused, mistõttu ei osutu võimalikuks hankelepingu täitmiseks vajalike tööde teostamine, on pooltel õigus pikendada tööde teostamise ja lepingu täitmise tähtaega. 9.5.1. Töövõtja esitab lepingu tähtaja pikendamiseks tellijale taotluse, milles näitab põhjendused ja selgitused, milliseid töid on võimalik kavandatud ajal läbi viia ning millised tööd tuleks edasi lükata, sest neid ei ole võimalik läbi viia alternatiivsete meetoditega. 9.5.2. Tööde osas, milles ajakava järgimine on takistatud koroonaviiruse (haigus COVID- 19) leviku tõkestamiseks õigusaktidega kehtestatud piirangute ja keeldude tõttu, lepivad pooled tegevuste uue ajakava kokku 30 päeva jooksul pärast piirangute ja keeldude kehtivuse lõppu. 10. Lõppsätted 10.1. Pooled juhinduvad lepingu täitmisel Eesti Vabariigis kehtivatest õigusaktidest, eelkõige kohaldatakse lepingus reguleerimata küsimustes võlaõigusseaduses vastava lepinguliigi kohta sätestatut. 10.2. Juhul kui lepingu mõni säte osutub vastuolus olevaks Eestis kehtivate õigusaktidega, ei mõjuta see ülejäänud sätete kehtivust. 10.3. Töövõtja on teadlik, et leping on avaliku teabe seaduses sätestatud ulatuses avalik. 10.4. Lepinguga seotud vaidlused, mida pooled ei ole suutnud läbirääkimiste teel lahendada, antakse lahendamiseks Harju maakohtule. Tellija Maksja Töövõtja /allkirjastatud digitaalselt/ /allkirjastatud digitaalselt/ /allkirjastatud digitaalselt/ Tel: +372 611 3558 +372 663 8200 Tel: +372 611 4610 [email protected] [email protected] [email protected] 7 Lisa 1. TEHNILINE KIRJELDUS 1. Hanke eesmärk Hanke eesmärk on leida pakkuja kuni 25 perioodi 2014-2020 Eesti-Vene CBC programmi (edaspidi kui Programm) Vene Föderatsiooni territooriumil teostatavate projektiauditite (üks projektiaudit = ühe projekti ühe partneri ühe aasta väljamaksetaotluste auditeerimine) läbiviimiseks perioodil 2020-2023. Hanke tellijaks on Rahandusministeerium ning hanke objekt täidab eesmärki Rahandusministeeriumi finantskontrolli osakonna võetud kohustuse täitmiseks nimetatud programmi auditiasutusena. Hanke hinnanguliseks mahuks on kolm kuni seitse projektiauditit aastas. Projektiauditite tegelik arv selgub hankelepingu täitmise käigus igal aastal eraldi. Projektiauditeid viiakse läbi ainult Programmi finantsmehhanismi osas ja ainult Vene Föderatsiooni territooriumil. Kõikide projektiauditite läbiviimiseks sõlmitakse välja valitud pakkujaga hankeleping, millega lepitakse kokku ühe projektiauditi läbiviimise hind. Hankeleping sõlmitakse välja valitud pakkujaga eeldatavalt 40 kuuks, kuid mitte kauem kui 31.12.2023. Projektiauditi eesmärk on analüüsida ja hinnata projektile või Programmile tehtud väljamakse kulude abikõlblikkust lähtuvalt: 1) projekti toetatavate tegevuste ja abikõlblike kulude vastavusest Programmi reeglitele, Euroopa Liidu ja Vene Föderatsiooni õigusaktidele ning taotluse rahuldamise otsusele; 2) abikõlblike kulude ning toetuse saaja raamatupidamisaruannete ja raamatupidamise algdokumentide vastavusest eelmises punktis toodule, v.a kulude lihtsustatud hüvitamisviiside puhul, mille hindamisel lähtutakse õigusaktides ja taotluse rahuldamise otsuses sätestatud erisustest; 3) toetuse saajale toetuse maksmisest õigel ajal ja ettenähtud mahus. 2. Hankelepingu alusel läbiviidava töö objekt ja metoodika 2.1 Töö objekt Töö objekt on aruandeperioodil (hinnanguliselt ühel aastal) toetuse saajale tehtud väljamaksete aluseks olevate kulude abikõlblikkuse auditeerimine ehk projektiauditi läbiviimine. Sisse ostetavate projektiauditite arv sõltub auditeeriva asutuse kalendriaasta tööplaanist ja olemasolevatest ressurssidest, kuid jääb hinnanguliselt kolme ja seitsme auditi vahele aastas. Projektiauditite objekt on eeldatavalt ühe aasta perioodil (1.07.N-30.06.N+1) toetuse saajatele väljamakstud kulud (väljamaksed) ja nende aluseks olevad kuludokumendid. Auditeeritavad objektid asuvad Vene Föderatsioonis, eeldatavalt arvestades Programmi territooriumi (Pihkva ja Leningradi oblastid ning Sankt Peterburi linn). Valimi kuludele hinnangu andmiseks (auditeeritavate väljamaksete nimekiri) koostab hankija indikatiivselt iga aasta 30. aprilliks, kuid mitte hiljem kui 31. juuliks. Täiendavalt võidakse lepingupartnerilt tellida nimetatud ajakava väliseid erakorralisi projektiauditeid. Näidetena võimalike töö objektide kohta on tehnilisele kirjeldusele lisatud fail „Näidisprojektid“, kus on seitse (7) erinevat projekti. Kirjeldatud on auditeeritava organisatsiooni liik, objektis leiduvate hangete arv, objekti kuluridade hulk ning kuluridade sisu. 2.2 Töö läbiviimise metoodika Töö teostamisel hinnatakse väljamaksete vastavust Programmi rakendamist reguleerivatele õigusaktidele, programmidokumentidele ja otsustele. Auditeerimise objektiks olevate väljamaksete ja nendega seotud projektide elluviimist reguleerivad dokumendid (sh programmid või meetme tingimused) on kättesaadavad Programmi koduleheküljel aadressil estoniarussia.eu. Töö teostamise tulemusena antakse ühe partneri väljamaksetele hinnang toetuse kasutamise korrektsuse kohta lähtuvalt Töö tehnilise kirjelduse punktis 1 toodud kriteeriumidest. Töö teostamisel tuleb järgida Programmi auditeerimiseks koostatud projektiauditi metoodikat. Pakkumise tegemise aluseks on viimane versioon dokumendist „Eesti-Vene programmi projektiauditi käsiraamat (periood 2014–2020)“. Töö teostamisel vormistatakse kõik auditi ametlikud tööpaberid ja auditi aruanne inglise keeles. Auditi toetavad dokumendid ja tõendusmaterjal võivad olla vormistatud vene, inglise või eesti keeles. Töö teostamise jooksul võib Rahandusministeeriumiga peetav suhtlus olla eesti või inglise keeles. Töö teostamisel juhindutakse rahvusvaheliselt tunnustatud auditeerimise kutsetegevuse standarditest (ISA, IIA või samaväärne siseauditi standard). Auditi aruandes tuuakse välja vastavus (või mittevastavus) asjakohastele standarditele. 3. Hankelepingu täitmise tulemus ning indikatiivne ajakava ja tähtajad 3.1 Hankelepingu täitmise tulemus Hankelepingu täitmise tulemus on väljamaksete põhjal läbi viidud, tähelepanekute esinemise korral toetuse saajate ning programmiasutuste poolt kommenteeritud, ning auditi eest vastutava isiku ja auditi juhi kinnitatud projektiauditi lõpparuanne koos auditi täieliku toimikuga. Hankelepingu indikatiivne maht on kuni 25 projektiauditit eeldatavalt 40 kuu vältel. Auditi täielik toimik peab sisaldama kõiki auditi läbiviimisel kogutud tõendusmaterjale ja toetavaid materjale; koostatud, ristviidatud ja allkirjastatud kontroll-lehti ja tööpabereid ning allkirjastatud auditi aruannet. Auditi toimikule, tõendusmaterjalidele, tööpaberitele, kontroll-lehtedele ja aruandele seatud miinimumnõuded on esitatud projektiauditi läbiviimise metoodikas. 3.2 Hankelepingu täitmise indikatiivne ajakava ja tähtajad Hankelepingu täitmise indikatiivne ajakava kalendriaasta kohta on järgmine (vt valimite moodustamise ajakava, punkt 2.1): Indikatiivne Tegevus tähtaeg Iga-aastane projektiauditite läbiviimine Läbiviidud projektiauditite aruande projektide ja tööpaberite esitamine Tellijale 30.09 Tellijaga kooskõlastatud projektiauditite aruande projektide edastamine toetuse 31.10 saajatele kommenteerimiseks Projektiauditite täieliku allkirjastatud dokumentatsiooni üleandmine Tellijale 30.11 Hankelepingu lõppemine 31.12.2023 Ajakava erakorraliste projektiauditite kohta võidakse eraldi kokku leppida. 4. Individuaalsete projektiauditite indikatiivne kooskõlastamine Tellijaga Individuaalse projektiauditi indikatiivne kooskõlastamine Tellijaga toimub järgmiselt: Indikatiivne Tegevus tähtaeg Konkreetse projektiauditi läbiviimine Läbiviidud projektiauditi aruande projekti ja tööpaberite esitamine Tellijale N Tellija tähelepanekud ja soovitused täienduste ja paranduste tegemiseks 7 tööpäeva aruande projekti ja tööpaberitesse Tellija soovitatud täienduste ja paranduste tegemine aruande projekti ja 7 tööpäeva tööpaberitesse ning selle täiendav kooskõlastamine Tellijaga Tellijaga kooskõlastatud projektiauditite aruande projektide edastamine toetuse N+14 tööpäeva saajatele kommenteerimiseks Hankelepingu lõppemine 31.12.2023 5. Pakkumuse esitamine Pakkuja esitab pakkumuse maksumuse vastavalt hankedokumentidele ühe projektiauditi kohta.
Allikas: Rahandusministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel