dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Sotsiaalministeerium
Väljaminev kiriAvalik

Norra Finantsmehhanismi 2009-14 programmi EE09 „Sooline võrdõiguslikkus ning töö- ja pereelu tasakaal“ finantsvahearuanne nr 7

Sotsiaalministeerium · 2. juuni 2015
Viit
2-6.2.3/2272-1
Registreeritud
2. juuni 2015
Dokumendi liik
Väljaminev kiri
Adressaat
Rahandusministeerium
Funktsioon
2 Välisabi ja struktuuritoetuste rakendamine
Sari
2-6.2.3 Norra finantsmehhanismi valdkond nr 28: Soolise võrdõiguslikkuse edendamise programm
Toimik
2-6.2.3/1
Vastutaja
Kärt Allert

Failid

  • 📎Kaaskiri EE09 IFR 7.bdoc135 KB

Sisu (failidest)

EE09 - Mainstreaming Gender Equality and Promoting Work-Life Balance IFR#7 - Jan 2015 - Apr 2015 Template for interim financial report EEA and Norwegian Financial Mechanisms 2009-2014 Programme summary Beneficiary State Estonia Programme title Mainstreaming Gender Equality and Promoting Work-Life Balance Programme number EE09 Planned total expenditure €2,352,941 (euro) Planned total eligible €2,352,941 expenditure (euro) Grant rate awarded 85.0000 Grant awarded (euro) €2,000,000 Date of donor decision 30/10/2012 Programme planned 30/04/2017 completion date Programme Operator Full legal name Ministry of Social Affairs Contact person Karel Parve Job title Programme Coordinator Address 15027 Tallinn Estonia Telephone +372 626 9818 Mobile Fax +372 Email [email protected] Page 1 of 8 Programme Operator signature I certify that I am duly authorised to sign this Interim Financial Report and that the proposed expenditure described in Part B from which this interim payment is calculated is a realistic estimate of the expenditure that will actually be required by the Programme in the period referred to in Part B. I have thoroughly reviewed the actual expenditure incurred described in Part A and co-financing provided in Part B of this report, and confirm that the information provided is accurate. I confirm that this Programme is carried out as described in the Programme Agreement and that the incurred expenditure is correctly represented. I confirm that the information presented on the list hereinafter is correct. Y/N/n/a Comments Management and control systems of the Programme Yes Operator set up fulfilling the general principles set out in the Regulation Information and publicity obligations fulfilled Yes Reviews to ensure quality of implementation Yes conducted Annual monitoring of a sample of projects conducted Yes Separate interest-bearing bank accounts dedicated to Yes the funds intended for regranting established and maintained Forecast of likely payment applications submitted Yes Annual programme report(s) submitted Yes Project-specific statistical data entered in the Yes reporting database Interest earned on the accounts intended for Yes regranting declared Special conditions and Programme-specific rules set N/A out in the programme agreement fulfilled All irregularities, their investigation and any remedies Yes taken reported For the Programme Operator Optional second signature Name Signature Position Date Month Year Date Month Year Date Page 2 of 8 Certification of actual expenditure incurred and co-financing Interim Financial Report number IFR#7 Start month of incurred expenditure period Jan 2015 End month of incurred expenditure period Apr 2015 Actual expenditure incurred this period €324,053 Start month of proposed expenditure period Sep 2015 End month of proposed expenditure period Dec 2015 Co-financing committed to date €271,746 The Certifying Authority hereby certifies that: (i) the summary of eligible expenditure submitted by the Programme Operator is in full conformity with the supporting documents; (ii) the supporting documents have been examined and found to be authentic, correct and accurate; (iii) the summary of eligible expenditure is based on verifiable accounting which is in compliance with generally accepted accounting principles and methods; (iv) the summary of eligible expenditure falls within eligible expenditure under the Regulation for the implementation of the EEA / Norwegian Financial Mechanisms 2009-2014; (v) the summary of expenditure is incurred as part of the implementation of the Programme in accordance with the Programme Agreement; (vi) sufficient audit trail exists; (vii) when appropriate, co-financing committed to the Programme has been paid. For the Certifying Authority Optional second signature Name Signature Position Date Month Year Date Month Year Date Page 3 of 8 PART A - STATEMENT OF ACTUAL EXPENDITURE INCURRED Incurred expenditure - summary Start date of incurred expenditure period Jan 2015 End date of incurred expenditure period Apr 2015 Previously incurred expenditure Incurred expenditure this period Total to date Programme incurred expenditure (euro) Eligible expenditure €727,071 €324,053 €1,051,124 Non-eligible expenditure €0 €0 €0 Total expenditure €727,071 €324,053 €1,051,124 Incurred expenditure - details Title Programme management Brief description of actual Expenditures include labour costs for the Programme Operator, costs (catering) related to a expenditure incurred cooperation committee meeting; costs (catering) for an information seminar for project promoters in the small grant scheme; costs for publishing the second call for proposals under the small grant scheme in three (two in Estonian, one in Russian) national newspapers; costs (rent for the space, catering, technology) related to a seminar on work-life balance. EUR Month Eligible expenditure Non-eligible expenditure Total expenditure Jan 2015 - Apr 2015 €16,305 €0 €16,305 Total €16,305 €0 €16,305 Title Awareness raised and research on gender issues promoted Brief description of actual The expenditure is comprised of two payments to the pre-defined project by the Gender Equality expenditure incurred and Equal Treatment Commissioner in the total sum of €129 912. One payment to the pre-defined project by Statistics Estonia in the sum of €8 230. Payments were also made to both projects selected from the open call: €46 628 to the Estonian Women’s Associations’ Roundtable and €23 822 to the Praxis Center for Policy Studies. EUR Month Eligible expenditure Non-eligible expenditure Total expenditure Jan 2015 - Apr 2015 €208,592 €0 €208,592 Total €208,592 €0 €208,592 Page 4 of 8 Title Balance between work, private and family life improved Brief description of actual Payments were made to both projects selected in the open call: €33 816 to the Tallinn University expenditure incurred of Technology and €15 877 to the Responsible Business Forum. EUR Month Eligible expenditure Non-eligible expenditure Total expenditure Jan 2015 - Apr 2015 €49,693 €0 €49,693 Total €49,693 €0 €49,693 Title Capacity of gender equality organisations and networks strengthened Brief description of actual Payments were made to four of the projects selected under the small grant scheme: €12 035 to expenditure incurred BPW Estonia, €8 990 to the Women’s Support and Information Centre, €12 498 to the NGO Oma Tuba and €10 585 to Tartu University. EUR Month Eligible expenditure Non-eligible expenditure Total expenditure Jan 2015 - Apr 2015 €44,107 €0 €44,107 Total €44,107 €0 €44,107 Title Fund for bilateral relations Brief description of actual Costs include €5 000 to BPW Estonia to execute an initiative under Measure B (initiatives to foster expenditure incurred bilateral relations between Estonia and Norway) and €356 to cover the transportation and hotel costs for a representative of Storebrand to share Norwegian practices at a seminar on work-life balance. EUR Month Eligible expenditure Non-eligible expenditure Total expenditure Jan 2015 - Apr 2015 €5,356 €0 €5,356 Total €5,356 €0 €5,356 Title Complementary action Brief description of actual No costs were incurred during the reporting period. expenditure incurred Page 5 of 8 EUR Month Eligible expenditure Non-eligible expenditure Total expenditure Jan 2015 - Apr 2015 €0 €0 €0 Total €0 €0 €0 Page 6 of 8 PART B - STATEMENT OF PROPOSED EXPENDITURE Proposed expenditure - summary Start date of proposed expenditure period Sep 2015 End date of proposed expenditure period Dec 2015 Previous advance and Interim payment this Total to date interim payments period Programme proposed expenditure (euro) Eligible expenditure €1,396,634 €415,000 €1,811,634 Contribution (Euro) EEA / Norwegian Financial Mechanisms €1,187,138 €352,750 €1,539,888 Co-financing €209,496 €62,250 €271,746 Adjustment for final balance €13,905 €2,000 €15,905 Retained from payment €11,818 €1,700 €13,518 Financial Mechanism disbursement €1,175,320 €351,050 €1,526,370 Proposed expenditure - details Title Programme management Brief description of activities to be The pre-payment would cover labour costs as well as the costs for activities that are financed meant for publicity and communication (i.e. rent for seminar rooms, catering, etc.). Euro Eligible expenditure €20,000 Amount retained for final balance - 10.00% €2,000 Amount to be financed €18,000 Title Awareness raised and research on gender issues promoted Brief description of activities to be The pre-payment would ensure that the PO has sufficient funds to cover any payments financed to the pre-defined projects and projects selected from the open call. The surplus from previous prepayments has been taken into consideration. Euro Eligible expenditure €250,000 Title Balance between work, private and family life improved Brief description of activities to be The pre-payment would ensure that the PO has sufficient funds to cover any requests financed from projects selected from the open call. The surplus from previous prepayments has been taken into consideration. Euro Eligible expenditure €50,000 Page 7 of 8 Title Capacity of gender equality organisations and networks strengthened Brief description of activities to be The pre-payment would ensure that the PO has sufficient funds to cover any requests financed from projects selected from both calls under the small grant scheme. The surplus from previous prepayments has been taken into consideration. Euro Eligible expenditure €90,000 Title Fund for bilateral relations Brief description of activities to be The fund has been transferred to the PO in full. financed Euro Eligible expenditure €0 Title Complementary action Brief description of activities to be The pre-payment would enable the PO to use the funds in a potential conference financed (planned for the fall of 2015) where the input from other POs in may be relevant. Euro Eligible expenditure €5,000 Page 8 of 8 Karin Viikmaa Teie: Rahandusministeerium nr [email protected] Meie: 06.2015 nr 2-6.2.3/2272 Norra Finantsmehhanismi 2009-14 programmi EE09 „Sooline võrdõiguslikkus ning töö- ja pereelu tasakaal“ finantsvahearuanne nr 7 Lugupeetud Karin Viikmaa Edastame Norra Finantsmehhanismist 2009-2014 rahastatud programmi EE09 „Sooline võrdõiguslikkus ning töö- ja pereelu tasakaal“ finantsvahearuande nr 7. Kinnitame, et programmi rakendamine toimub vastavuses Norra Finantsmehhanismi 2009- 2014 rakendusmääruse ja siseriikliku seadusandlusega, aruandeperioodil teostatud kulud on abikõlblikud, raamatupidamislikult eristatud ja tagatud on piisava kontrolljälje olemasolu. Lugupidamisega (allkirjastatud digitaalselt) Marika Priske Kantsler Lisa: EE09_Interim Financial Report No 7.pdf Karel Parve 626 9818 [email protected] Gonsiori 29 / 15027 Tallinn / 626 9301 / [email protected] / www.sm.ee / registrikood 70001952
Allikas: Sotsiaalministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel