dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Majandus- ja Kommunikatsiooniministeerium
Sissetulev kiriAvalik

Volinik Bulci kirja edastamine minister Simsonile

Majandus- ja Kommunikatsiooniministeerium · 11. oktoober 2018
Viit
24.1-2/2018/8536
Registreeritud
11. oktoober 2018
Dokumendi liik
Sissetulev kiri
Adressaat
EV alaline esindus Euroopa Liidu juures
Saabumis/saatmisviis
DVK
Funktsioon
24.1 EL ja rahvusvahelise koostöö korraldamine
Sari
24.1-2 EL-ga seotud kirjavahetus (Arhiiviväärtuslik)
Toimik
24.1-2/2018
Vastutaja
Meelis Kivinurm (Majandus- ja Kommunikatsiooniministeerium, Kantsleri valdkond, Euroopa Liidu ja rahvusv koostöö osakond)
Lahendamise tähtaeg
26. oktoober 2018

Failid

  • 📎1630-1_kaaskiri_Simson.pdf126 KB
  • 📎1630_Baltic_ministers_of_Transport_-_Rail_Baltica_-_AC.pdf89 KB

Sisu (failidest)

Pr Kadri Simson Minister Majandus- ja Kommunikatsiooniministeerium 11.10.2018 Nr 10.1-13/1630-1 Austatud minister Edastame Teile Euroopa Komisjoni volinik Violeta Bulci kirja 10. oktoobrist 2018 nr 5212191. Lugupidamisega Clyde Kull esinduse asejuht Coreper-I küsimustes Kersti Neeme [email protected] +32 2 227 4342 Rue Guimard 11/13 / B-1040 Brüssel / Belgia Tel: +32 2 227 39 10 / [email protected] / http://www.eu.estemb.be Ref. Ares(2018)5212191 - 10/10/2018 European Commission VIOLETA BULC Brussels, 1 0, 10. 2018 Member of the European Commission AC/Ares(20 I 8) Ms. Kadri SIMSON Minister of Economic Affairs and Infrastructure Suur-Ameerika 1 10122 Tallinn ESTONIA Mr. Uldis AUGULIS Minister of Transport and Communications Gogola iela 3 1743 Riga LATVIA Mr. Rokas MASIULIS Minister of Transport and Communications Gedimino Ave. 17 01505 Vilnius LITHUANIA Dear Ministers, The resignation of Ms Baiba Rubesa from her position as CEO of RB Rail AS on 27 September has attracted a certain level of public attention on the progress and governance of the Rail Baltica project. While the political commitment of the Baltic States has been demonstrated on multiple occasions and technical progress is being made, there is certainly room for improvement in the way the project is being implemented. The accumulated delays in the implementation of the project, and more particularly of the milestones of the Grant Agreements signed in 2014 and 2015, are indeed worrying. It is positive to note that all five Member States concerned have agreed on the Implementing Decision on Rail Baltica, which was also endorsed by the TEN-T Committee on 27 September. At the same time, significant efforts are required to achieve the deadlines contained therein and to avoid loss of CEF funds in the future. Rue de la Lol/Wetstraat 200 B - 1049 Brussels - Tel: +32-2-295 56 25 E-Mail: [email protected] Securing availability of funding throughout the design and construction phase to come, will require an acceleration as well as the highest level of commitment of all partners to the joint vision on the Rail Baltica global project. In this context, I consider it a matter of urgency to discuss the status and outlook of Rail Baltica with you, and would like to invite you to a joint meeting in the margins of the Informal meeting of transport and environment ministers on 29-30 October in Graz. My cabinet will be available for the practical arrangements, and I invite your services to contact Mr Alessandro CARANO ( A1 cssand ro ,C a rano a cc, cu ro pa. c u, +32 229-5845). Yours faithfully, Electronically signed on 10/10/2018 13:16 (UTC+02) in accordance with article 4.2 (Validity of electronic documents) of Commission Decision 2004/563 2
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel