dokumendiregister.ee
OtsingAsutusedMCP
Otsing›Majandus- ja Kommunikatsiooniministeerium
Sissetulev kiriAvalik

Kiri

Majandus- ja Kommunikatsiooniministeerium · 16. oktoober 2018
Viit
1.1-14/2018/8661
Registreeritud
16. oktoober 2018
Dokumendi liik
Sissetulev kiri
Adressaat
Riigikontroll
Saabumis/saatmisviis
e-post
Funktsioon
1.1/S Ministeeriumi juhtimine
Sari
1.1-14/S Kirjavahetus ministeeriumi tegevuse ja juhtimise korraldamisega seotud küsimustes (Arhiiviväärtuslik)
Toimik
1.1-14/2018
Vastutaja
Merike Saks (Majandus- ja Kommunikatsiooniministeerium)

Failid

  • 📎E-kiri.pdf300 KB
  • 📎VK_MKM_RAM_TJA_RKAS_energiatõhususe_auditi_edastamine_Lea Kõu_15.10.2018_2-2.7_70128_3.bdoc4845 KB

Sisu (failidest)

Kadri Simson majandus- ja taristuminister Meie 15.10.2018 nr 2-2.7/70128/3 Majandus- ja Kommunikatsiooniministeerium Rene Tammist ettevõtlus ja infotehnoloogia minister Majandus- ja Kommunikatsiooniministeerium Janek Mäggi riigihalduse minister Rahandusministeerium Kaur Kajak peadirektor Tehnilise Järelevalve Amet Kati Kusmin juhatuse esimees Riigi kinnisvara Rahvusvahelise energiatõhususe auditi edastamine Austatud asutuse juht Saadan Teile teadmiseks rahvusvahelise ühisauditi „Avaliku sektori hoonete energiatõhus us “ aruande nr 2-1.7/70128/13. Vastavalt Riigikontrolli seaduse §-le 51 avalikustab Riigikontroll kontrolliaruande. Auditi materjalid leiate Riigikontrolli kodulehelt - https://www.riigikontroll.ee/Suhtedavalikkusega/Pressiteated/tabid/168/ItemId/1009/amid/557/langu age/et-EE/Default.aspx . Lugupidamisega /allkirjastatud digitaalselt/ Ines Metsalu-Nurminen peakontrolör Lisa: Kontrolliaruanne nr 2-1.7/70128/13 Kaire Kuldpere [email protected] Kiriku 2/4, 15013 Tallinn. Tel +372 640 0700, www.riigikontroll.ee, e-post [email protected], reg-nr 74000056. ENERGY EFFICIENCY of Public Sector Buildings EUROSAI WGEA Cooperative Audit Eight European Supreme Audit Institutions have participated in this cooperative audit: Court of Audit of Belgium Bulgarian National National Audit Office State Audit Office (Flemish Region) Audit Office of Estonia of Hungary State Audit Office National Audit Office Court of Auditors Supreme Audit Office of Latvia of Lithuania of Portugal of the Slovak Republic PROJECT LEADER: National Audit Office of Estonia, Chair of EUROSAI Working Group on Environmental Auditing PROJECT CO-LEADERS: State Audit Office of Latvia, National Audit Office of Lithuania This document is available at www.eurosaiwgea.org For further information and enquiries, please contact the Secretariat of EUROSAI WGEA: E-mail: [email protected] Tel: +372 640 0100 September 2018 TABLE OF CONTENTS EXECUTIVE SUMMARY 5 GLOSSARY 9 INTRODUCTION 10 1. THE FULFILMENT OF REQUIREMENTS ARISING FROM THE ENERGY PERFORMANCE OF BUILDINGS DIRECTIVE 14 1.1. Examples of nearly zero-energy buildings are to be found in most countries, but comprehensive national policies are yet to be carved out 15 1.2. A system of issuing and monitoring energy performance certificates has been established in all countries, but national audits have identified certain shortcomings 18 1.3. In most cases, requirements for minimum energyperformance have been set close to the cost optimal level 22 2. EXEMPLARY ROLE OF CENTRAL GOVERNMENT BUILDINGS 24 2.1. Countries have opted for a limited scope of the 3% target 27 2.2. Some countries are having difficulties to meet the 3 % target 31 2.3. Funding for energy efficiency in public sector buildings would benefit from better planning and evaluation 34 2.4. Monitoring and supervision over the fulfilment of the 3% target was not sufficient in most countries 38 Appendices 40 Appendix I – Institutional scheme 40 Appendix II – Audit questions 41 Appendix III – Participants 42 Mr Philippe Roland Mrs Elita Krūmiņa Senior President Auditor General Court of Audit of Belgium State Audit Office of Latvia Mr Tzvetan Tzvetkov Dr Arūnas Dulkys President Auditor General Bulgarian National Audit Office National Audit Office of Lithuania Mr Janar Holm Mr Vítor Manuel Auditor General da Silva Caldeira Chair of EUROSAI WGEA President National Audit Office of Estonia Court of Auditors of Portugal Mr László Domokos Mr Karol Mitrík President President State Audit Office of Hungary Supreme Audit Office of the Slovak Republic 5 | Energy Efficiency of Public Sector Buildings Executive summary Buildings account for approximately 40% of the ener- In order to determine how well Member States gy consumption and 36% of carbon dioxide emission are prepared to meet the requirements for energy in the European Union (EU). While approximately a efficiency in the public sector buildings, Supreme third of the EU’s building stock is over 50 years old, Audit Institutions (SAIs) of eight countries - Belgium just 0,4-1,2% is renovated each year. Publicly owned 1 (Flanders), Bulgaria, Estonia, Hungary, Latvia, or occupied buildings represent about 10-12% by Lithuania, Portugal and Slovakia, have examined area of the EU building stock . A significant potential whether these requirements have been implement- for energy savings therefore awaits to be tapped in ed into national law. The aim on the cooperative this field. Public sector can lead the way in efforts to audit was to determine whether there is sufficient increase the rate of renovations by prioritizing energy planning in order to fulfil the requirements of the efficiency in its own buildings and thus fostering the directives. creation of necessary know-how in terms of new technologies and building methods. During the compilation of the results of the cooperative audit, participating SAIs have noted that one underlying That is the reason why in both the Energy Efficiency principle has emerged from the findings that relates to Directive (EED) and the Energy Performance of several audit questions, namely that governments could Buildings Directive (EPBD) the public sector’s leading do more to ensure that their public sectors serve an role and example-setting obligation is determined. In exemplary role regarding buildings’ energy efficiency. the EED this obligation focuses on an annual 3% ren- ovation duty or, alternatively, an equivalent energy Governments could make greater savings target for central government buildings. This and more systematic efforts for the public allows for the development of national best practices sector to fulfil its leading role in improving and serves as a visible example for a wider public. energy efficiency in buildings The national audits have concluded that govern- Additional requirements for public sector buildings ments could have done much more in the field of are established in the EPBD. These include manda- energy efficiency of public buildings and the efforts tory energy performance certification and public dis- towards fulfilling the public sector’s leading role play of certificates, as well as an earlier date at which should have been greater and more systematic. all new buildings owned and occupied by public authorities should be nearly zero-energy buildings. Most audited countries have done well in transpos- Furthermore, the EPBD also requires governments ing the concrete targets of the directives into national to encourage public authorities to implement the law. Most countries have put in place the 3% target recommendations included in energy performance and devised necessary financial instruments, as well certificates. as established requirements for nearly zero-energy 1 Impact assessment accompanying the document “Directive of the European Parliament and of the Council on energy efficiency and amending and subsequently repealing Directives 2004/8/EC and 2006/32/EC and annexes (SEC(2011)779); Ecorys, Ecofys and BioIntelligence (2010): Study to Support the Impact Assessment for the EU Energy Saving Action Plan. 6 | Energy Efficiency of Public Sector Buildings buildings and for public sector buildings to have and example and giving an impulse for the creation of display energy performance certificates. Likewise, the necessary know-how for the rest of the country the systems for monitoring and control have been through best practices obtained while building nZEB developed. public authority buildings. Nevertheless, implementation has remained a A system of issuing and monitoring challenge. Looking more closely into how the targets, energy performance certificates has been requirements and systems have been implement- established in all countries ed, the national audits have found that funding has In all eight participating countries a law or a regula- mostly been incoherent, the effectiveness of mea- tion sets the standards, as well as an independent sures has not been analysed, monitoring and control control system for energy performance certificates. systems tended not to fulfil their purpose, checks Also, in all of the participating countries institutions, have not been conducted in practice, and over half mainly public bodies, have been appointed and of the participating countries have been struggling made responsible for monitoring the proper quality to meet the 3% target. Henceforward the main audit and display of the certificates. Nevertheless, both findings that are in common in the majority of the the quantity and quality of monitoring the proper national audits are presented. functioning of the systems exhibit shortcomings. Though regulatory measures are mostly in place, Examples of nearly zero-energy buildings are to actual checks have been done rarely or only to a be found in most countries, but comprehensive small extent. Without proper monitoring and control national policies to facilitate construction of mechanisms the full potential of energy performance such buildings are yet to be carved out certificates as awareness raising tools cannot be While more than half of the countries show exam- exploited. ples of nearly zero-energy buildings, comprehensive planning has been lacking in most. Though more Some countries are having than half of the countries have adopted a plan to difficulties to meet the 3 % target increase the number of nearly zero-energy buildings, Data gathered in national audits have indicated just two of the participating SAIs could report that that significant differences exist in the ways coun- the plan also included information about financial tries have chosen to define the scope of the annual instruments and other measures for the promotion renovation or energy saving target. Several countries of nearly zero-energy buildings. The lack of com- have tried to minimize the cost and administrative prehensive national planning for nearly zero-energy burden of the requirement by choosing narrower buildings entails a risk that the participating coun- definitions and smaller renovation and savings tar- tries might not be able to fully transition to only gets. National audits identified that, as of the end of building nZEBs by the deadlines set in the EPBD. As 2017, half of the countries were on track to meet the the deadline is earlier for buildings owned by public 3% target. However, it appeared that five out of the authorities, the risk is higher for these buildings. That eight countries that participated in the cooperative also means that governments might fail in setting an audit are already struggling or will be struggling in 7 | Energy Efficiency of Public Sector Buildings the future to meet the target. In addition to the four Main recommendations made by audit countries that have not fulfilled the target, one SAI institutions in their national audits has found in the course of the national audit that, National audits have made recommendations to even though the government has managed to fulfil their responsible ministries and institutions. The the target thus far, the target will most probably not following recommendations can be brought out as be fulfilled in the future. The main obstacles to meet reoccurring in many national audits: the target arise from the lack of well thought out and implemented planning and funding allocated for • Four SAIs that participated in the cooperative this purpose. Though most audited countries have audit have noted that energy efficiency of public a plan in place to reach the 3% target, the fulfilment sector buildings would benefit from more plan- of the plan has been monitored in only a few of the ning, including the creation of comprehensive countries. Also, some of the national audits have strategies to enhance the energy performance of indicated that monitoring the fulfilment of the target, public sector buildings. The need for proper indi- as well as coordinating and monitoring funding, cators, as well as coherent and well-planned goals could be improved significantly. has been indicated. In most countries, funding energy efficiency • Four SAIs also have noted that the implementation in public sector buildings would benefit from of the energy efficiency programmes could be better financial planning and effectiveness more efficient and effective. SAIs have pointed evaluation out that there should be adequate staffing in the The EED lists various possibilities for funding implementing institutions and proper measures activities geared towards improving the energy developed. performance of buildings. National audits found, though, that countries have been modest in using • Three SAIs have pointed out that either the these possibilities. It appears from the national data systems or the way in which data are gath- audits that the funds necessary to meet the 3% ered should be updated and a comprehensive target, have neither been estimated nor planned and valid overview should be developed of the in half of the participating countries. Results from state and energy efficiency of buildings falling un- the national audits also have shown that, though der the public sector definition or at least under the various financial instruments used have mostly the central government definition. been coordinated between the institutions in charge of implementing them, the general effective- • Five SAIs have recommended that the system ness of these financing instruments to ensure that for monitoring, including keeping updated the goals were being met, have not been assessed lists of buildings that fall under the 3% target, in most audited countries. should be enhanced. More precisely, SAIs have 8 | Energy Efficiency of Public Sector Buildings recommended that a better and more systematic record should be kept of the fulfilment of the 3% target, supplemented with systematic and targeted monitoring and controlling activities. Furthermore, the findings from the monitoring and control activities should be analysed to make sure that the targets and requirements of the directives are met. According to the recommen- dations made by the participating SAIs, countries should also strive to ensure that the public sector buildings that are required to have energy perfor- mance certificates, indeed do have them. • Five participating SAIs also have recommended that the funding of energy efficiency improve- ments in public sector buildings should be improved. For example, a better overview of financing options, including using energy service providers, should be made available and funding for the 3% target should be sufficient and well thought out. • Finally, two SAIs have recommended that more energy saving measures should be implemented, ambitions should be increased and legislative measures should be developed to ensure that the buildings of public bodies serve an exemplary role. 9 | Energy Efficiency of Public Sector Buildings Glossary Energy performance of a building – the calculated or measured amount of energy needed to meet the energy demand associated with a typical use of the building, which includes, inter alia, energy used for heating, cooling, ventilation, hot water and lighting. Minimum energy performance requirements – value limits to total energy consumption of buildings, expressed via an energy performance indicator demonstrating the energy consumption of a building per heated/cooled square metre, a numeric indicator of primary energy use based on specific factors per energy carrier, and other requirements established in national regulations. Requirements may be different for existing buildings and new buildings, and may vary according to building type (residential buildings, office buildings, educational buildings, trade services buildings, etc.) and elements (external wall, roof, floor, window). Cost-optimal level – energy performance level which leads to the lowest cost during the nation- ally estimated economic lifecycle to exploit the energy-saving potential in buildings to a maximum extent. Energy-related investment costs, maintenance and operating costs as well as disposal costs, where applicable, are considered. Nearly zero-energy building (nZEB) – a building that has a very high energy performance. The nearly zero or very low amount of energy required should be covered to a very significant extent by energy from renewable sources, including energy from renewable sources produced on-site or nearby. 10 | Energy Efficiency of Public Sector Buildings Introduction Public sector buildings improvement of buildings and provide a stable reg- in the EU climate and ulatory environment for investment decisions. Both energy policy framework directives aim to help consumers make informed decisions that help to save energy as well as money The European Union aims to create a low-carbon and give regulators a guide for building a regulatory economy by 2050 with intermittent targets for 2020, national framework. 2030 and 2040. According to the roadmap, emis- sion from houses and office buildings can almost As laid down in EU law, European directives generally completely be cut – by as much as 90% – by 2050. only take effect once they have been transposed into Buildings also account for approximately 40% of the national law of a Member State. This means Member EU’s energy consumption and approximately one States are free to choose the form and methods best third of the EU’s building stock is over 50 years old. suited for their implementation. In this process they often need to adapt existing national rules and regu- Publicly owned or occupied buildings represent lations, select and apply policy measures, coordinate about 10-12% by area of the EU building stock . 2 between different ministries and authorities, as well Energy efficiency investments in public buildings as involve other stakeholders. It is up to each Member are advantageous to the public owner in two ways. State to appoint institutions responsible for the First, one can perceive both the energy savings, implementation of these policies. Each country also productivity and value improvements normally needs to ensure that the roles and responsibilities of accruing to private ownership. Secondly, one can these institutions have been assigned and are clearly also enjoy public benefits, such as an increase of understood. An overall institutional scheme based on employment, a reduction of emissions and improve- the data from national audits gathered for the cooper- ments to public accounts. A significant potential for ative audit sub-question 1.4. is presented in Appendix energy savings therefore awaits to be tapped in this I. Each country adapts the requirements of the legal field. The energy performance of buildings could be framework according to its needs. Comprehensive significantly improved through implementing energy strategies and plans that address these issues are of efficiency technologies in new buildings, energy great practical value to ensure a successful outcome. efficient refurbishment of old buildings, substitut- ing renewables for fossil fuels in heating, cooling, Role of Supreme cooking, etc. Audit Institutions Both the Energy Performance of Buildings Directive Supreme audit institutions (SAIs) are independent, (2010) and the Energy Efficiency Directive (2012) non-political, and fact-based in their work. SAIs play have been adopted to promote energy performance an important role by auditing government accounts 2 Impact assessment accompanying the document “Directive of the European Parliament and of the Council on energy efficiency and amending and subsequently repealing Directives 2004/8/EC and 2006/32/EC and annexes (SEC(2011)779); Ecorys, Ecofys and BioIntelligence (2010): Study to Support the Impact Assessment for the EU Energy Saving Action Plan. 11 | Energy Efficiency of Public Sector Buildings and operations. The mandates of SAIs may some- concern and share the latest developments in audit- what vary but they have similar responsibilities ing and other applicable professional standards and providing legislatures and society with necessary best practices. EUROSAI features several thematic information to hold governments accountable. working groups, including the Working Group on Governments’ financial management, compliance Environmental Auditing (EUROSAI WGEA). with domestic laws and international agreements, policy implementation, and performance are in the During the 2015 spring session of the EUROSAI WGEA, focus of SAI work. energy efficiency of public sector buildings was cho- sen as a possible topic for cooperation. In February The European Organization for Supreme Audit 2017 the SAIs of Belgium (Flanders), Bulgaria, Estonia, Institutions (EUROSAI), as one of the regional groups Hungary, Latvia, Lithuania, Portugal and Slovakia (BE of the International Organization of Supreme Audit (FL), BG, EE, HU, LV, LT, PT, SK) have signed an agree- Institutions (INTOSAI), provides a forum on which ment to conduct a cooperative audit on the energy government auditors can discuss issues of mutual efficiency of public sector buildings. Population (mil) 10,3 Portugal Slovakia 283 69 Estonia Central 616 government Lithuania overall building 1891 stock 1,3 EE Latvia Bulgaria LV 1091 1221 LT FL SK HU Estonia Slovakia 1,3 mil 420 329 BG Hungary Central 1,9 mil government Portugal PT overall building Bulgaria 7,3 mil 2,4 mil stock, m2 Latvia Lithuania 2,6 mil 3,7 mil 12 | Energy Efficiency of Public Sector Buildings Methodology The joint findings are based on the eight national on conducting cooperative audits of international audits evaluating the activities targeted at increasing environmental accords. The extent to which all the energy efficiency of public sector buildings. The sub-topics have been covered was decided by each main objective of the audit was to share results and SAI individually, based on the scope of its national experiences from audits focusing on the energy effi- audit. All national audits were compliance4/perfor- ciency of public sector buildings and to evaluate the mance audits, focussing on policy implementation, preparedness to meet the requirements for energy economy, efficiency and effectiveness. The period efficiency of public sector buildings. The following audited was 2014-2017. three main questions for the cooperative audit were established at the outset of the project: Data collected during national audits along with the main results from national audits have served as 1. Has a policy framework for increasing energy an input to developing common key messages and efficiency of public sector buildings been estab- writing the overview of the results from the national lished? audits, henceforth called the joint findings. All data 2. Are there sufficient funds allocated for financing and cases featured in this document have been pro- the set plan/strategy? vided by the eight SAIs and each SAI is responsible 3. Is there a system for monitoring the achieved for the validity of the data sent. energy efficiency targets in place? The joint findings have been prepared by the The legal framework (audit criteria) providing the National Audit Office of Estonia, chair of EUROSAI basis for the cooperative audit : 3 WGEA and coordinator of the cooperative audit, and the State Audit Office of Latvia and the National Audit • The Energy Performance of Buildings Directive Office of Lithuania, co-leaders of the audit. All eight 2010/31/EU participating SAIs have contributed with national • The Energy Efficiency Directive 2012/27/EU inputs, helped develop the common key messages and provided quality assurance of the joint findings. SAIs participating in the cooperative audit have developed an audit approach template (audit Hereinafter, the joint findings of the national audits design matrix), including suggested audit questions will discuss in more detail how the participating (Appendix II), criteria and comparable data to be countries have managed to fulfil the abovemen- collected. Each SAI has carried out its national audit tioned targets and requirements of EPBD (part 1 of guided by the agreed template and in accordance this document) and EED (part 2 of this document). with its internal practices and standards, as well as During the compilation of the joint audit findings INTOSAI auditing standards, including ISSAI 5140 the participating SAIs have noted one underlying 3 While the directives were in force at the time of the agreement of the cooperative audit and the audited period, it must be noted that amendments to Directive 2010/31/EU were adopted by the Directive (EU) 2018/844 of the European Parliament and of the Council of 30 May 2018. Revision of Directive 2012/27/EU is also underway. No significant changes regarding the requirements for public sector buildings are, however, to be anticipated. 4 The SAI of Hungary conducted a pure compliance audit and did not contain performance audit elements. 13 | Energy Efficiency of Public Sector Buildings principle emerged from the audits and related to questions from the audit design matrix in Appendix several audit questions, namely that governments II are covered in both sections 1 and 2 according could do more to ensure that their public sec- to the corresponding directive, and question two tors serve an exemplary role regarding buildings’ is discussed in sections 2.2. and 2.3. Furthermore, energy efficiency. Thus, the participating SAIs have for each finding the corresponding sub-questions decided not to present the audit findings accord- have been marked in the footnotes for easier ing to the structure of audit questions, but accord- comprehension. Results are presented by audit ing to the agreed-upon audit findings, following findings that were common in most or a majority the two corresponding directives. The first and last of SAIs. 14 | Energy Efficiency of Public Sector Buildings 1. The fulfilment of requirements arising from the Energy Performance of Buildings Directive The Energy Performance of Buildings directive sets three main requirements for the public sector in terms of setting an example for the rest of the country – earlier transition to building nearly zero-energy buildings, having and displaying energy performance certificates and defining cost-optimal minimum ener- gy performance requirements. Firstly, Member States should only build energy efficient buildings in the future. As an example-setter, the public sector should aspire to do so sooner than the rest of the country. As such, Member States have to ensure that: (a) by 31 December 2020, all new buildings are nearly zero-energy buildings; and (b) after 31 December 2018, new buildings occupied and owned by public authorities are nearly zero-energy buildings. This also means that governments have to prepare plans and measures to insure a smooth transition. Member States must draw up national plans for increasing the number of nearly zero-energy build- ings. These plans must include also the policies and financial instruments or other measures for the promotion of nearly zero-energy buildings, including details of national requirements and measures concerning the use of energy from renewable sources. 15 | Energy Efficiency of Public Sector Buildings Secondly, the EPBD requires all Member States to certificates placed in a clearly visible area in the lay down the necessary measures to establish a building. Furthermore, government should encour- system of certification of the energy performance of age public authorities to fulfil the recommendations buildings. The energy performance certificate has to brought out in the energy performance certificates include the energy performance of the building and issued to buildings owned by them. reference values, such as minimum energy perfor- mance requirements, in order to make it possible for Thirdly, the EPBD requires Member States to cal- owners or tenants of the building or building unit to culate the cost-optimal level for minimum energy compare and assess its energy performance. performance requirements, i.e. the energy perfor- mance level which leads to the lowest cost during Buildings occupied by public authorities and build- the nationally estimated economic lifecycle of a ings frequently visited by the public should set an building whilst exploiting its energy-saving potential example by showing that environmental and energy to a maximum extent. After all, buildings have an considerations are being taken into account and impact on long-term energy consumption. Given the therefore those buildings should be subject to energy long renovation cycle for existing buildings, new and certification on a regular basis. The EPBD also requires existing buildings that are subject to major renova- that buildings occupied by a public authority and fre- tion should therefore meet minimum energy perfor- quently visited by the public have energy performance mance requirements adapted to the local climate. 1.1. Examples of nearly zero-energy buildings are to be found in most countries, but comprehensive national policies are yet to be carved out5 Audit offices have examined whether governments countries (BE (FL), BG, HU, LT, PT, SK) had adopted a have documented plans to increase the number of plan of some sort to increase the number of nearly nearly zero-energy buildings, including the detailed zero-energy buildings, only the SAIs of Hungary application of the nZEB definition and specific re- and Belgium (Flanders) reported that the plan also quirements, as well as financial and other measures provided information about the policy, including to support the construction of nZEBs. financial instruments and other measures, for the promotion of nearly zero-energy buildings. While examples of nearly zero-energy buildings are already to be found in more than half of the par- For example, Belgium (Flanders) has been supply- ticipating countries, comprehensive planning was ing grants, supporting research and development, lacking in most. Though six of the eight participating and conducting information campaigns (see case 5 Joint finding based on the findings from sub-question 1.5. 16 | Energy Efficiency of Public Sector Buildings of Belgium (Flanders) below). In Hungary, special public sector projects were underway. In all other financial measures have been designed aiming at the countries such measures were lacking. Thus, com- construction of nearly zero-energy model projects prehensive national policies to facilitate construction under the EU operational programme’s 2014-2020 of such buildings in both public and private sectors programming period. As of the end of 2017, seven are yet to be carved out. Campaigning for nZEB in Belgium (Flanders) The Flemish Energy Agency, a government agency, has developed a campaign “nZEB, constructing a nearly zero-energy building is thinking ahead”. The campaign aimed at informing and sensitizing to the topic candidate builders and renovators, and all professionals involved in construction. The campaign started in September 2013 when the Flemish government defined nZEB. Various channels have been used, such as the press, the Internet, newsletters, publications, study days, construction fairs and events, booklets in general print media, targeted advertisements and editorial contributions in professional journals for (re-) builders and building professionals. A crucial element of the campaign strategy is the multiplier principle: “pioneers” may use the campaign image and receive campaigning material. These pioneers are stakeholder organizations from the professional building world, local authorities, informa- tion providers, etc., who are already promoting or applying nZEB-building methods and are eager to play their pioneer role. Pioneers can give greater visibility to their involvement by using the campaign image. While one of the nearly-zero energy building require- • “energy required should be covered to a very ments is to ensure that the energy consumed should significant extent by energy from renewable be covered to a very significant extent by renewable sources, including energy from renewable sources sources, the share required was quantified only in produced on-site or nearby” (BE/FL) Hungary (≥ 25%), Slovakia (≥ 50%) and Bulgaria • “taking into account renewable energy solutions (≥ 55%). The national audit of SAI Bulgaria has shown where possible” (EE), that, though the law states that “no less than 55% • “the use of renewable energy is ensured at least of the total energy has to be derived from renewable partially” (LV), sources”, the process of transitioning to nZEB has • “most of the energy consumed is renewable been hampered by the not yet transposed EPBD energy” (LT), deadlines. Other countries have been much vaguer • “largely satisfied with the use of energy from in their indications, using phrases such as: renewable sources” (PT). 17 | Energy Efficiency of Public Sector Buildings Furthermore, what is understood under the concept of nZEB differs greatly from country to country. Mostly, nearly zero-energy buildings have been tied to energy classes and energy performance indicators (see Table 1 below). Country Numeric indicator of primary energy use, kWh/m2 year BE (FL) Weighted average of each building part BG ≤ 140 (for administrative buildings) EE ≤ 100 (office buildings, libraries and science buildings) HU ≤ 90 (for office buildings) LV ≤ 95 LT Building must comply with class A++ PT New buildings must comply with class B- and existing ones with C SK ≤ 61 (administrative buildings) *NB! Some of the countries only take into account energy consumed for heating and/or cooling while others calculate the total energy consumption of the building, including the electricity used, etc. Table 1: Numeric indicators of primary energy use for nearly zero-energy buildings* The lack of comprehensive national planning for for these buildings, though, because of the recom- nearly zero-energy buildings, entails a risk that the mendation by the European Commission, many of participating countries might not be able to fully the participating countries also had to bring forward transition to building only nZEBs by the deadlines the date for the private sector6. Variations in the set in the EPBD. As the deadline is earlier for build- standards set for nZEB could also limit the expected ings owned by public authorities, the risk is higher energy saving effect of the planned policies. 6 Recommendation 2016/1318 - http://eur-lex.europa.eu/legal-content/EN/TXT/?uri=CELEX%3A32016H1318 18 | Energy Efficiency of Public Sector Buildings 1.2. A system of issuing and monitoring energy performance certificates has been established in all countries, but national audits have identified certain shortcomings7 SAIs have sought to verify whether the system of independent control system for energy performance energy performance certification, according to the certificates. In all of the participating countries requirements of the EPBD, has been established in institutions, mainly public bodies, have also been their countries. Audit offices have also examined appointed and made responsible for monitoring the whether governments have set up functioning sys- quality and display of the certificates. tems for monitoring energy performance certification in public sector buildings. Furthermore, SAIs have Data about energy performance certificates collected data to assure that the monitoring system were available in four of the audited countries also worked in practice. Nevertheless, when SAIs assessed the quantity and quality of monitoring the proper functioning All eight participating countries have a law or a of the systems put in place, the results were not so regulation that set the standards, as well as, an positive. Member States have to ensure that: an energy performance certificate is issued for buildings occupied by a public authority and frequently visited by the public. During national audits, SAIs have checked whether Bulgaria, Estonia and Latvia. In Slovakia, the informa- information about central government buildings’ tion concerning energy performance certificates is energy performance certificates was available. stored in a central registry. Even though the registry Since at least central government buildings that are does not separate central government buildings from frequently visited by the public, must have an energy other types of administrative buildings, this informa- performance certificate and annual national invento- tion can be accessed on request. ries for calculating the 3% target have to be made, it was assumed that these should include information In the four countries where data were available8 the about their energy performance. Therefore, it should audits have concluded that energy performance be fairly easy to find this information. Nevertheless, certificates have been issued only partly and within a the data were only available in Belgium (Flanders), broad range, as shown in Figure 1 below. 7 Joint finding based on the findings from sub-question 1.6. and 3.4. 8 SAI Slovakia did not request this information. 19 | Energy Efficiency of Public Sector Buildings 47% 14% 62% 26% BELGIUM BULGARIA ESTONIA LATVIA (Flanders) Figure 1: Energy performance certificates issued for central government buildings Frequency of energy performance certificates quality checks varied in audited countries According to the EPBD: the institutions responsible for implementing the independent control system shall make a random selection of at least a statistically significant percentage9 of all the energy performance certificates issued annually and subject those certificates to verification. In most of the countries appointed institutions also performance certificates10” differ significantly between check the quality of the certificates. countries, though. As a result, the share of all certificates checked (not only central government’s) vary within The approaches for a random selection of the a wide range, as shown in Figure 2 below. In Latvia, “statistically significant percentage of issued energy Lithuania and Slovakia these data were not available. Bulgaria 70-80% Portugal 1,3-3,8% Hungary 2,5% Estonia 0,4-0,8% Belgium (Flanders) <0,001% Figure 2: Checks of the quality of the energy performance certificates 9 Directive (EU) 2018/844 of the European Parliament and of the Council of 30 May 2018 amending Directive 2010/31/EU on the energy performance of buildings sets the following corrected wording for this requirement: “The competent authorities or bodies to which the compe- tent authorities have delegated the responsibility for implementing the independent control system shall make a random selection of all the energy performance certificates issued annually and subject them to verification. The sample shall be of a sufficient size to ensure statistically significant compliance results.” 10 The European Commission (DG Energy) has provided a table for random sample size necessary to ensure statistical confidence. According to the European Commission’s findings, in 2014, at least eleven MSs used a random sample that was too small, especially when the sample is split up into subsamples (e.g., new/existing buildings or residential/non-residential buildings). 20 | Energy Efficiency of Public Sector Buildings Member States have to ensure that: the energy performance certificate issued for buildings occupied by a public authority and frequently visited by the public are displayed in a prominent clearly visible place When it comes to checking public sector buildings of 2016 checks have been made, but inspectors for the proper display of energy performance certifi- found no displayed certificates. In the first half of cates, Belgium (Flanders) has found in the course of 2017, though, 15% of the public sector buildings their national audit that this had not been checked. liable to the obligation had certificates properly In Portugal, Latvia and Lithuania data concern- 11 displayed. Only in Estonia the Technical Regulatory ing this matter were not available. In Bulgaria and Authority had checked all public authorities that Slovakia less than 1% of all public buildings has should have energy performance certificates and been checked annually. In Hungary, before mid continues to do so regularly (see case of Estonia 2016, no checks had been made. In the second half below). Monitoring and controlling has lead to the increase of energy performance certificates in Estonia The Technical Regulatory Agency (TRA) is in charge of checking the quality and proper display of ener- gy performance certificates in Estonia. Since there had been little available information about public sector buildings or the information had been scattered between authorities, the TRA has been collect- ing information by sending questionnaires to public sector authorities and gathering publicly available information about buildings they owned, including from the websites of the authorities. Based on that information, the TRA has checked whether all buildings owned by public authorities have acquired and properly displayed energy performance certificates. The TRA has asked for photos to prove the latter. As a consequence of their work, the number of public sector buildings both on a central government and local government level that have an energy performance certificate grew significantly. 11 During inspections of public sector buildings the responsible institution in the report indicates if the energy performance certificate is not displayed in a visible place, but such data have not been summarized. 21 | Energy Efficiency of Public Sector Buildings Implementing the recommendations ciency Act stated that the recommendations in energy Only Bulgaria and Hungary have developed policies to performance certificates must be implemented within 3 encourage public authorities to implement the recom- years of the issuing date of the certificate. Furthermore, mendations included in energy performance certificates on-the-spot checks verify whether certificate recommen- (see case of Hungary below). In Bulgaria the Energy Effi- dations are implemented on time. The obligation to consider the recommendations made in energy performance certificates in Hungary In compliance with Directive 2010/31/EU, a government decree regulates the obligation of public bodies to implement the recommendations included in the energy performance certificates issued for their re- spective buildings. According to the decree, the certificate’s recommendation for energy saving has to be considered in the course of a building renovation that has energy saving as its purpose, provided that a full financial return on the renovation expenses is expectable during the expected lifetime of the building whenever renovations are completed within the expiry date of the certificate. While all the requirements of the Energy Performance of work in practice. Thus, public sector authorities have Buildings Directive concerning energy performance cer- not fully set the example and more awareness could tificates have mostly been transposed into national law, have been raised about the energy performance of countries are doing little to ensure that these systems buildings by displaying energy performance certificates. 22 | Energy Efficiency of Public Sector Buildings 1.3. In most cases, requirements for minimum energy performance have been set close to the cost optimal level12 The EPBD foresees the application of minimum requirements to the energy performance of new buildings as well as existing buildings subject to major renovation. According to the EED, Member States have to take the necessary measures to ensure that minimum energy performance requirements for buildings or building units are set with a view to achieving cost-optimal levels. Cost-optimal levels shall be calculated in accordance with the comparative methodology framework set in the EPBD. Member States should use this framework to compare the results with the minimum energy perfor- mance requirements which they have adopted. The difference between the two should not exceed 15% National audits have sought to determine whether energy performance requirements made by the the requirements for minimum energy performance European Commission in 201614 have been imple- have been set and this at a point not more than mented. 15% below the level deemed cost-optimal when calculated according to the comparative method- All SAIs reported that the minimum energy perfor- ology established by the European Commission . 13 mance requirements have been established and SAIs also have sought to verify, where applicable, compared with calculated cost-optimal levels (see whether recommendations concerning minimum also the case of Belgium (Flanders) below). The Flemish Government hired academic experts to calculate the cost-optimal levels All requirements for minimum energy performance take into account the results of calculated cost-opti- mal levels. The Flemish Government has hired academic experts to calculate the cost-optimal levels. Due to the fact that the portfolio of buildings in Flanders mainly consists of residential buildings, priority was given to these buildings. Later on, a calculation method was developed for non-residential buildings. In the cost-optimal levels calculations, special attention was paid to newly built constructions because of the long-term effects of energy savings in these buildings. Requirements were equalized with calculated cost-optimal levels, unless the studies were inconclusive. Another exception was based on the fact that renovation should be stimulated, so standards were set a little lower in order to stimulate renovation. 12 Joint finding based on the findings from sub-question 1.2. 13 Commission Delegated Regulation (EU) No 244/2012, supplementing Directive 2010/31/EU. 14 Report from the Commission to the European Parliament and the Council: Progress by Member States in reaching cost-optimal levels of minimum energy performance requirements, COM(2016) 464 final. 23 | Energy Efficiency of Public Sector Buildings The total average gap was 15% or less in almost all participated in the cooperative audit. The findings of of the participating countries. Based on the calcu- most SAIs (5 out of these 6) have shown that govern- lations made by the Member States, the European ments have considered the recommendations of the Commission has made recommendations for European Commission and have made necessary im- improving the situation in 6 of the countries that provements regarding the minimum requirements. 24 | Energy Efficiency of Public Sector Buildings 2. Exemplary role of central government buildings The most concrete output of the EED requirement for the target. Thus, no one concrete path to fulfil the the central government to serve an exemplary role target can be prompted, as further elaborated in the is Article 5 of the directive titled “Exemplary role of upcoming sub-sections. As a first step, countries had public bodies’ buildings”. Member States have quite to choose whether to renovate buildings or to save a large amount of liberty to decide how to fulfil this energy, i.e. whether to opt for the “default” or “alter- requirement, starting from which approach they native” approach. take, to what buildings are included in the scope of According to Article 5, Member States have to ensure that from 1 January 2014, 3% of the total floor area of heated and/or cooled buildings owned and occupied by its central government is renovated each year to meet at least the minimum energy performance requirements (default approach). As an alternative to the 3% annual renovation target, Member States may take other cost-effective measures to achieve, by 2020, an amount of energy savings in eligible buildings owned and occupied by their central government that is at least equivalent to that required by a default approach, reported on an annual basis (alternative approach). Audited countries used different approaches for reaching energy savings in central government buildings Five of the countries (BG, EE, HU, LV, LT) participating in the cooperative audit have chosen the default approach and have opted for renovating their central government buildings, while three (PT, SK, BE (FL)) have chosen the alternative approach (see also map below) and have decided to save the equivalent amount of energy. EE LV LT FL Default approach SK Alternative approach HU BG PT Map: Participating countries divided by chosen approach In the alternative approach, countries needed to default approach. Types of the chosen alternative notify the alternative measures to the European measures for countries participating in the coopera- Commission and had to calculate how much energy tive audit are listed in Table 2 below. could be saved by 2020 if they would have taken the Country Types of alternative measures 1. Implementation of recommendations included in the Energy Performance Certificates BE (FL) 2. Construction of new energy efficient buildings 3. Deep renovations 1. Implementation of an energy action plan that may include measures such as: • Installation of an energy management system PT • Replacement of equipment to increase efficiency • Behavioural change 1. Improving energy efficiency in public buildings (including thermal modernisation as well as renovation of technical building systems) SK 2. Energy audits for public buildings 3. Behavioural change of occupants of public buildings Table 2: Types of the alternative measures 26 | Energy Efficiency of Public Sector Buildings In the default approach, buildings must be renovated ed/cooled central government buildings had to be to meet at least national minimum energy perfor- established and published by the end of 2013. In the mance requirements set according to the EPBD. In alternative approach, making an inventory was not the alternative approach, the same minimum energy mandatory but it was suggested for the better calcu- performance requirements are to be used to calcu- lation of the energy saving potential. The statistics of late the possible energy savings. central government buildings by country can be seen in Table 3 below. National inventories of central government buildings As for the default approach, to apply the renovation requirement in practice, national inventories of heat- Country Central government overall building stock Central government buildings failing Floor area to meet minimum energy efficiency failing requirements to meet minimum energy Average Average efficiency Number Floor area, Number Floor area, floor area floor area require- m2 m2 per building, per building, ments from m2 m2 total, % 1 2 3 4 = 3/2 5 6 7 = 6/5 8 = 6/3*100 BE (FL) N/A* N/A* N/A* 150 535 396 3569 N/A* BG 1221 2 399 068 1965 1168 2 279 393 1952 95% EE 616 1 284 822 3163 423 777 551 1838 40% HU N/A* 1 900 000˜ N/A* 80 413 072 5163 22% LV 1091 2 636 713 2417 872 1 910 441 2191 62% LT 1891 3 719 563 1967 1570 2 777 042 1769 75% PT 283 7 329 150 25 898 N/A* 82 284 N/A* N/Aˆ SK¯ 69 420 329 6092 67 404 816 6042 99% (Central government buildings over 250 m2 and buildings with excluding exceptions counted out – last available data) * – data not available ˆ – The total areas in the Portuguese inventory are not reliable, because some of them include the land area and not only the area of buildings. ˜ – Data estimate from 2014 ¯ – Data from 2015 Table 3: Statistics of central government buildings 27 | Energy Efficiency of Public Sector Buildings 2.1. Countries have opted for a limited scope of the 3% target15 In the course of the cooperative audit, SAIs have examined how the definitions connected to the Article 5 com- mitment have been applied in practice in their countries. The concept of “central government buildings”, focal in the case of Article 5, was explored in comparison with other countries, as regards the institutional range, number and types of buildings covered. The scope, and thus also the fulfilment, of the 3% target are very much depen- dent on how countries have defined “central government”. In the EED “central government” has been defined as “all administrative departments whose compe- tence extends over the whole territory of a Member State”. In putting this definition into practice, the European Commission has recommended Member States to refer to Annex IV of the Public Procurement Directive or to the data on public accounts collected by Eurostat based on Council Regulation 479/2009/EC, i.e. the European System of Accounts classification16. Scope of “central government buildings” classification have been used as a basis for identi- varied in countries fying central government entities to which Article 5 Data gathered in national audits show significant applies (see also Table 4 below). Some countries have differences in how countries have interpreted Article chosen a more limited approach (see also case of 5 of the EED. Both the Public Procurement Directive Portugal below) or an ambiguous approach, lacking (PPD) and the European System of Accounts (ESA) a concrete definition, as was the case in Bulgaria. 15 Joint finding based on the findings from sub-question 1.1. 16 According to the European Commission staff working document SWD (2013) 445 final, accompanying the document Communication from the Commission to the European Parliament and the Council Implementing the Energy Efficiency Directive, these two options are possible. Count- ries have already made lists of central government buildings for the purpose of these two EU law documents. Depending on the country, these two options can vary quite significantly and, thus, the Commission has decided to let each country decide for itself. 28 | Energy Efficiency of Public Sector Buildings Limiting the definition of central government in Portugal The exemplary role of public bodies’ buildings in Portugal has become limited as a consequence of the reduced number of buildings in the inventory due to the concept of central government applied. The Portuguese definition considers only the direct administration of the State, excluding institutions such as ministerial cabinets, agencies, schools, higher education institutions and many more. Furthermore, as the inventory only listed buildings both owned and occupied by central government, many buildings occupied by direct administration have not been included because they are formally owned by a state- owned real estate company which is not part of the direct administration. As a result, 250 out of the 283 buildings listed in the inventory of central government buildings were military barracks and premises, including 5 Air Force bases that could be excluded if later analysis show that these buildings serve de- fence purposes. Given the confidentiality associated with a significant part of these buildings, it was not possible to determine the affectation of each of these in a precise way in due time. Furthermore, while Estonia has included both buildings that are owned and occupied by the buildings owned, as well as buildings occupied by central government at the same time (see Table 7 the central government, others have only included below). Heritage Approach buildings Country Owned/occupied Examples (PPD/ESA) excluded by default Central government administration and agencies and their local offices; state social own occ BE (FL) ESA No care centres and state scientific institutes, museums and theatres Buildings used by the state administration own occ BG None Yes only – ministries, agencies, etc. Central government institutions and agencies, including public schools, excluding local and municipal schools which make up the own occ EE PPD majority of schools and state higher education Yes institutions which are public law institutions, state-owned enterprises, social care institu- tions and hospitals 29 | Energy Efficiency of Public Sector Buildings Heritage Approach Some examples buildings Country Owned/occupied (PPD/ESA) (schools, hospitals, museums, etc.) excluded by default Only central government administration and agencies and their local offices, as well own occ HU PPD Yes as courts and prosecutor’s office, SAI office, Central Bank and social security funds Central government institutions and agencies, including state higher education institutions (state universities etc.), state museums, state social care centres, state scientific institutes, own occ LV PPD Yes courts and prosecutor’s office as well as social security funds, except state-owned companies, such as state hospitals, state theatres, post offices, railway stations and airports Central government institutions and agencies, including state museums and theatres, but own occ LT PPD Yes excluding post offices, social security funds, railway stations and airports Only government departments, not including ministerial cabinets, agencies and local offices, own occ PT None No schools, higher education institutions and state-owned enterprises Only central government administration, state scientific institutes, court and prosecutor’s own occ SK ESA Yes office, the Parliament building and the SAI office Table 4: Use of alternative counting opportunities by countries 30 | Energy Efficiency of Public Sector Buildings Upon comparing countries, it appears that pub- Though EED Article 5 also provides the opportunity lic services can be provided by different levels of to extend the 3% target to the floor area owned and government and different types of institutions, or occupied by administrative departments at a level by municipalities, depending on the national law . 17 below central government, only the SAI Slovakia As a result, supported by data gathered during the could report that this option has been used. In cooperative audit, the range and types of buildings Slovakia the 3% energy savings target has been included in the 3% target vary by country. calculated based on the total floor area of all public sector buildings, including those owned and occu- EED Article 5 provides an opportunity to exclude pied by regional and local governments. heritage buildings, in so far as their compliance with minimum energy performance requirements would Countries have also been unacceptably alter their character or appearance. using other ways to fulfil the target The audits have shown that such buildings have The EED also grants Member States the opportunity to indeed by default been excluded in most countries. count new buildings towards the renovation target. Member States may count towards the annual renovation rate of central government buildings new buildings occupied and owned as replacements for specific central government buildings demolished in any of the two previous years, or buildings that have been sold, demolished or taken out of use in any of the two previous years due to more intensive use of other buildings Interpretation of this opportunity differs from coun- Two countries (HU, LT) have opted to count towards try to country. Exactly half of the participating coun- the fulfilment of the target buildings that were no tries (BE(FL), BG, LV, SK) have not used either of the longer in use (see Table 5 below). Estonia was the above mentioned EED options, be it because no new only country that has both counted the floor area buildings have been built or the government has de- of the buildings that were no longer used or had cided not to use these options. The latter is the case been demolished because a new building had been in Latvia, for example, as the Latvian government did built, as well as the floor area of buildings that had not find it necessary to use either of the provided been sold, demolished or taken out of use, mainly options because they were able to fulfil the target as a result of optimizing building space, with no new without including these buildings in the calculations. buildings erected to replace them. 17 See also European Commission report „A Comparative Overview of Public Administration Characteristics and Performance in EU28“, 2018. One of the conclusions of the study is that there is high heterogeneity among the countries with regard to the size, set-up and competences of central government. 31 | Energy Efficiency of Public Sector Buildings Country New buildings occupied and owned Buildings that have been sold, as replacements for specific central demolished or taken out of use in any government buildings demolished of the two previous years due to more in any of the two previous years intensive use of other buildings BE (FL) No No BG No No EE Yes Yes HU No Yes LV No No LT No Yes PT No No SK No No Table 5: Use of alternative counting opportunities by countries As a result of these various interpretations of how burden of the requirement by choosing the narrow- to define “central government”, the proportion of er definitions and smaller renovation and saving buildings included in the scope of the 3% target by targets. The overall situation of the energy efficiency each country and, thus, also the required renovation of central government buildings might therefore or energy saving rate, can vary quite significantly. appear better than it is in reality and could also quite Participating SAIs have found that their countries considerably reduce the potential positive effects of have tried to minimize the cost and administrative the energy performance of public sector buildings. 2.2. Some countries are having difficulties to meet the 3 % target18 SAIs have examined how their governments have down the target for renovation and energy sav- been able to ensure the fulfilment of the Article 5 ing, participating countries are to a large extent commitment and have found that, even though the still struggling to meet the 3% target (see Table 6 definitions for “central government” have skimmed below). 18 Joint finding based on the findings from sub-questions 1.3.; 1.4.; 2.1. and 3.1. 32 | Energy Efficiency of Public Sector Buildings 2014 2015 2016 renovated floor area BG N/A N/A N/A Default (% of of buildings) EE 1,46% 6,16% 3,01% HU - 2,29% 4,78% LT 2,24*% 1,71% 0 LV 8,98% 5,45% 1,36%** Alternative BE (FL) 5,93 GWh of 5,93 GWh (by 2020) (energy saved) PT 0,16 GWh of 3,8 GWh (by 2020) SK 111 GWh of 365 GWh (by 2020) * If a Member State renovates more than 3 % of the total floor in a given year, it may count the excess towards the annual renovation rate of any of the three previous or following years. In the fulfilment of the targets for years 2014 onwards the renovations done in years 2011 to 2013 have been included. ** Indicative information Table 6: Progress towards fulfilment of the 3% target in central government buildings In four of the audited countries the 3% target has be attributed to the limited number of buildings up to now been met. Belgium (Flanders) has set the involved in the calculation of potential energy saving energy saving target at 5,93 GWh for 2020 and has, as target, as well as the method of calculating the ful- of 2017, already fulfilled it. Nevertheless, the national filment of the target under the alternative approach audit has shown that the fulfilment could mostly (see case of Belgium (Flanders) below). Calculating the fulfilment of the energy savings target in Belgium (Flanders) In order to calculate how much energy should be saved, Belgium (Flanders) has calculated how much primary energy it could have saved if it had chosen the default approach. Since no precise data of all buildings concerned were available, Flanders has made the calculation for an existing office building that was selected as a reference building and extrapolated the result to the part of the building stock for which insufficient data were available. Flanders argued that according to the EPBD a ‘major renovation’ of a building means the renovation of more than 25 % of the surface of the building envelope. It argued that in the reference building, the roof forms approximately 25% of the envelope. Roof renovation there- fore could be considered a major renovation of the building. A study has shown that an improvement of the roof insulation could reduce primary energy consumption of the building by 14 kWh/m2/year. 33 | Energy Efficiency of Public Sector Buildings Hungary, Latvia and Estonia have also fulfilled the of the objective should be taken with reserve as the annual 3% renovation target. While not part of the reliability of the data was questionable, since the es- initial scope of neither the cooperative nor the nation- timated savings were the result of including potential al audit, the SAI of Estonia has found that the future savings from implementing proposals made in ener- fulfilment of the target was questionable. The main gy performance certificates, whereas no one has ever problem in Estonia was that neither the fulfilment verified whether these savings were actually made. nor the financing of the 3% target has been planned ahead and energy efficiency has not been a priority The SAI of Slovakia has found in the course of its when making public sector real-estate decisions. Thus, national audit that, though in 2014 a plan was al- the Ministry of Finance has indicated that the future ready in place to meet the 3% saving target, only two fulfilment of the target is questionable . 19 central government buildings have been renovated as of 2017. The main issue was the lack of funds in In Hungary, the fulfilment of the target was partly the state budget for renovating central government due to the fact that, as a result of the reorganization buildings (see also section 2.3 below). Nevertheless, of government institutions, the area designated for Slovakia has managed to slightly overfulfil the energy renovation decreased by 4.78%. At the time of the saving target in 2016. In both 2014 and 2015 the Hungarian audit, decisions have been made about target was not met, and SAI Slovakia has concluded the use of EU funds for the renovation of central that the future fulfilment of the target is only possi- government buildings, which, according to the audit, ble if government continues to count in savings in ensures that the 3% renewal target will be met in buildings on an administrative level below central 2017 and 2018 also. government. All other countries are struggling to fulfil the target. Bulgaria and Lithuania are also struggling to meet In Portugal energy savings have only been estimat- the 3% target (see Table 6 above) and, as the national ed for 2016 and the conclusion has been that the audits indicated, will most probably also do so in country was far from achieving the objectives set. the future. In Bulgaria the main problem is the lack Furthermore, the national audit has shown that, sim- of comprehensive planning (see case of Bulgaria ilarly to Estonia, no plan has been drawn up to meet below), as well as incomplete and poor-quality data the target in Portugal. Also, the SAI of Portugal has about performed renovations (see also section 2.4 noted that the available data about the fulfilment below). 19 The Estonian Government has since taken steps to ensure the future fulfilment of the 3% target and developed measures to enhance the financing and planning of central real-estate investments. 34 | Energy Efficiency of Public Sector Buildings Lack of planning and proper implementation has been a major obstacle to fulfilling ambitious targets in Bulgaria When transposing the Energy Efficiency Directive objectives into national legislation the Bulgarian authorities have taken a more ambitious approach. The 3% renovation target was increased to 5% and the national plan for renovation of the buildings owned and occupied by the state administration sets up a more ambitious goal for these buildings’ energy performance – they have to reach class B after renovation while the statutory minimum energy performance requirement is class C. Nevertheless, as of January 2018 no practical implementation of these targets was begun because the renovation plan was officially only adopted at the end of 2017. Prior to this date, a coordinated centralized approach to renovating public sector buildings had not been planned nor implemented. An inventory of buildings had been compiled, however no prioritization nor selection of buildings for annual renovation took place. Also, until 2018 data on renovations gathered by central and local authorities and sent to the Sustainable Energy Development Agency in annual reports, were often incomplete and sometimes inaccurate, making them unsuitable for correctly calculating the fulfilment of the 3% target. In Lithuania a plan to meet the 3% target has been in Thus, it appears that most of the countries that par- place since 2014 but no buildings have been renovat- ticipated in the cooperative audit, are already strug- ed. The progress towards the fulfilment of the target gling or will be struggling in the future to fulfil Article has been made by counting in buildings taken out of 5 of the EED on central government’s obligation to use (see also section 2.1.). fulfil an exemplary role in energy efficiency. 2.3. Funding for energy efficiency in public sector buildings would benefit from better planning and evaluation20 Promoted by the EED, Member States have a range national energy efficiency funds to several EU funds, of opportunities to choose financial instruments revenues from annual emission allocations, energy when allocating resources for improving the energy service companies (ESCOs) and energy performance performance of buildings: from national budgets and contracting. 20 Joint finding based on the findings from sub-question 2.1.; 2.2. and 3.2. 35 | Energy Efficiency of Public Sector Buildings Energy Efficiency National Fund - As a means of supporting national energy efficiency initiatives, obligated parties under national energy efficiency obligation schemes (large energy distributors and energy sales companies) could fulfil their obligations by contributing annually to an Energy Efficiency National Fund an amount that is equal to the investments required under the scheme. Energy service companies (ESCO) – Companies delivering energy services or other energy efficiency improvement measures in a final customer’s facility or premises. Energy performance contracting (EPC) – A contractual arrangement between the beneficiary and the provider of an energy efficiency improvement measure, verified and monitored during the whole term of the contract, where investments (work, supply or service) in that measure are paid for in relation to a contractually agreed level of energy efficiency improvement or other agreed energy performance criterion, such as financial savings. National audits have sought to determine whether that the necessary funds have been estimated per financial instruments necessary to meet the require- square meter (see also Figure 3 below). In Slovakia the ment of Article 5 have been developed and are being funds have been estimated in total, but the cost of coordinated, as well as whether the effectiveness of renovation per square meter has not been calculated. the said mechanisms has been assessed. The SAIs of In other countries, no separate estimation or planning Latvia, Lithuania, Hungary and Bulgaria have reported of funds have been made. Lithuania Latvia 213,7 Hungary 250 43-109 0 250 Bulgaria 60-80 Figure 3: Estimation of funds needed (€/m2) Four SAIs (LV, LT, HU and SK) have also reported appointed in their country (see the case of Lithuania be- that institutions responsible for monitoring and low). In other countries, monitoring and control of the controlling the financing of renovations have been funds have not been assigned to a specific institution. 36 | Energy Efficiency of Public Sector Buildings Good planning is not always sufficient to achieve sound results – case of Lithuania Pursuant to the provisions of Article 5 of EED, authorities have developed the national energy efficiency programme for public buildings, appointed institutions in charge of programme implementation, super- vision and management, and allocated funds. Nevertheless, no buildings have been renovated under the previously mentioned programme as of January 2018. Since investments in renovation of public buildings are paid back in 30-40 years and the renovation being financed with a repayable assistance model, authorities were not interested in the renovation of buildings. To reach the implementation of the objectives set out in the Directive, public sector entities are obliged to renovate a concrete amount of building area. Countries have been using different financial has shown that in Belgium (Flanders), Bulgaria and instruments for energy efficiency investments; Estonia ESCOs have been used in the public sector, ESCOs and Energy efficiency funds have not albeit little and not for the purposes of fulfilling the widely been used 3% target. Similar conclusions can be made about Financial instruments marked for the 3% target vary Energy Efficiency funds. Four of the participating significantly across the countries. Mechanisms most SAIs (BG, LV, LT, PT) have established a fund, but used were the EU Structural and Cohesion Funds, none of these funds have been utilized for the followed by the state budget and the income from renovation of central government buildings in the sale of emission allowances. The cooperative audit audited period. EU Structural Income State Loans, Energy Other Country and Cohesion from sale budget guarantees Performance Funds of emission Contracting allowances (ESCO) BE (FL) X X BG X X X KIDSF12 (EBRD) budget of the central real estate EE X management agency HU X X LV X X X LT X X X PT X SK X X X X Table 7: Financial support instruments marked for the fulfilment of the 3 % target 21 The Kozloduy International Decommissioning Support Fund (KIDSF) – established and administered by the European Bank for Reconstruction and Development (EBRD). 37 | Energy Efficiency of Public Sector Buildings Countries do not always make investment decisions according to energy performance The EED also stipulates that: investments should be prioritized for central government buildings with the poorest energy performance. On a project level, countries have set similar selec- certificates, are key to identifying the condition in tion criteria for renovations: minimal energy saving which a building is in efficiency wise, it has been requirements; planned energy savings/reductions difficult for governments to adequately decide which of CO2 emissions in relation to investments; energy buildings to prioritize. savings larger than investments, considering the time value of money. Nevertheless, the lack of data It was also concluded from most national audits provided either by energy performance certificates that while cost-effectiveness was being evaluated (see also section 1.2.) or energy audits for central for individual projects, effectiveness of the whole government buildings has made it difficult to put of financial support mechanisms for the renova- this principle into practice as a selection criterion tion of central government buildings has been for determining which buildings to renovate as a pri- assessed only in Latvia (see also the case of Latvia ority. As detailed data, such as energy performance below). Evaluation of financial instruments in Latvia For the EU (2014-2020) funds used for the renovation of central government buildings, an ex-ante assessment has looked into the effectiveness of previous financial instruments (EU funds, guarantees and income from the sale of emission allowances (Climate Change Financial Instrument) for energy efficiency improvement in buildings), as well as possible alternatives for the planned instruments. Total necessary funding for the mechanism was identified, calculating the required fulfilment of the 3% renovation target, taking into account the cost-effectiveness of previous instruments (€/m2). Though financial instruments have mostly been co- reality brought about the intended results. This has ordinated between the different institutions in charge led to a situation where money was being spent but of implementing them, the responsible institutions countries have no systematic overview if or to what have rarely evaluated whether the funds spent have in degree the spending has fulfilled its purpose. 38 | Energy Efficiency of Public Sector Buildings 2.4. Monitoring and supervision over the fulfilment of the 3% target was not sufficient in most countries22 Monitoring is essential to assessing the progress of over the fulfilment of the EED Article 5 target has any given policy effort, and it will also provide an been arranged effectively in their countries. opportunity to identify possible shortcomings and devise means for improvement. Effective monitor- The audits have identified that institutions responsible ing relies on accurate and consistent information for checking the progress of fulfilling the national plan about the targeted objects and the implementation or strategy in place to ensure the fulfilment of the 3% of policy measures. National audits have sought to target have been appointed in 5 out of 8 countries (BE determine whether the monitoring and supervision (FL), HU, LV, LT, SK) (see the case of Slovakia below). Monitoring energy efficiency in Slovakia Central government authorities, higher territorial units, municipalities, organizations within their sphere of responsibility and other statutory bodies were required to send their data about the accomplished renovations to the Energy Efficiency Monitoring System operator through the web interface. The Slovak Innovation and Energy Agency has annually issued a Monitoring Report on the Renovation of the Central Government Buildings, including information on the total floor area of central government buildings that do not meet the minimum energy performance requirements, the total renovated area of relevant buildings and the total volume of energy savings achieved in relevant buildings. The Agency has not only assessed the fulfilment of the energy savings target by analysing the documents of the central state administration authorities, but also by looking into the energy performance certificates issued to the buildings. Comprehensive monitoring of the 3% target, though, has not been done in most countries, as shown in Figure 4 below: while the overall progress of fulfilling the target was being monitored in most countries, de- tailed data necessary for tracking progress and mea- suring impact was often partial or missing altogether. 22 Joint finding based on the findings from sub-question 3.1. 39 | Energy Efficiency of Public Sector Buildings BE (FL) Action EE WHETHER PT THE COUNTRY WAS Countries that monitored HU FULFILLING THE LT XX Countries that did not monitor 3% TARGET BU LV SK There was a CREDIBLE BE INVENTORY (FL) BU EE HU of renovated buildings or other LV energy savings measures, includ- ing an overview of all funds spent LT PT SK (including as a proportion from the funds earmarked at the outset) Figure 4: Monitoring and supervision over the fulfilment of the 3% target by countries Audit findings of most countries have indicated that in the lack of planning – with no plan it was difficult the general performance of Article 5 “Exemplary role to estimate whether the policy was on track. Other of public bodies’ buildings” related policy instru- countries had a problem with collecting credible ments, both prior to and after implementation, was data. Altogether, countries could do more to properly difficult to evaluate. In some countries the issue lay monitor the funding and fulfilment of Article 5. 40 | Energy Efficiency of Public Sector Buildings Appendices Appendix I – Institutional scheme EUROPEAN COMMISSION NATIONAL RESPONSIBLE INSTITUTIONS Annual reporting of energy savings data • Prepares the National Energy Efficiency Action Plan • Prepares the Long-term Investment Strategy for Renovation of the Buildings • Annually prepares an inventory of central government buildings, selects buildings that do not comply with minimum energy performance requirements EXPERT CERTIFICATION BODIES • Annually calculates fulfilment of the 3 % target (PUBLIC OR PRIVATE) (renovated buildings/energy savings in central government buildings) Issues certificates for Independent experts • Checks display of Energy performance certificates in public buildings Monitors and supervises the quality of Energy performance certificates CENTRAL Issues Energy performance certificates for buildings INDEPENDENT GOVERNMENT EXPERTS 41 | Energy Efficiency of Public Sector Buildings Appendix II – Audit questions 1.1. Is there a clear definition for “public buildings” on a national level? 1.2. Have the requirements for minimum energy performance been set? 1. 1.3. Has a renovation strategy/plan for central government buildings in accordance with Article 5 of the of the Directive 2012/27/EU been adopted? Has a policy 1.4. Have the institutions responsible for the implementation of the framework for increas- measures set in the strategy/plan and monitoring and supervision ing energy efficiency of been appointed? public sector buildings 1.5. Has a strategy/plan for ensuring that from 2019 all new buildings owned been established? and occupied by public authorities are nearly-zero energy buildings been adopted? 1.6. Has the central government developed policies for promoting energy efficiency in public buildings in accordance with Directives 2010/31/EU and 2012/27/EU? 2. Are there sufficient 2.1. Are there enough investments nationally allocated to fulfil the 3% target for renovating central government buildings or to make the planned funds allocated for energy savings? financing the set plan/ 2.2. Have appropriate criteria for allocating financial instruments been set? strategy? 3.1. Has a functioning system for monitoring and control been established to guarantee the fulfilment of the renovation strategy/plan for central government buildings in order to meet minimum energy performance 3. requirements? Is there a system for 3.2. Has a functioning system for monitoring and control for financing energy monitoring the achieved efficiency renovations been established in the member state? energy efficiency 3.3. Has a functioning system for monitoring and control for energy audits been established in the member state*? targets in place? 3.4. Has a functioning system for monitoring and control for energy performance certification been established in the member state? 3.5. Has a functioning system for detecting and penalizing infringements been established in the member state*? *-These questions have not been further elaborated in the joint findings document, since the national audits did not produce significant results that could be consolidated and compared in the joint findings report. 42 | Energy Efficiency of Public Sector Buildings Appendix III – Participants Institution Team members Jan Meyus Court of Audit of Belgium Dieter Demunter Chris Leflere Detelina Hadijeva National Audit Office Dimitar Dimitrov of the Republic of Bulgaria Rositsa Taneva-Ivanova Angelina Stefanova Kaire Kuldpere Kaire Kesküla National Audit Office of Estonia Janne Kurg Kristiina Visnapuu Gyula Pulay State Audit Office of Hungary Gábor Görgényi Szabolcs Tótpál State Audit Office of the Republic of Latvia Jānis Salenieks Mindaugas Valančius National Audit Office of Lithuania Tadas Čiblys Court of Auditors of Portugal José Augusto Silva Ľuboslava Tittoňová Supreme Audit Office Anna Dobrócsyová of the Slovak Republic Viera Eiselová Viera Gerbocová Asutus: Riigikontroll Registreerimise kp: 15.10.2018 Registreerimise nr: 2-2.7/70128/3 Saadetava dokumendi pealkiri: Rahvusvahelise energiatõhususe auditi edastamine Edastan digitaalallkirjaga 15.10.2018 kirja nr 2-2.7/70128/3. Palun kirja kättesaamisest kindlasti teavitada. Lugupidamisega Lea Kõu konsultant Riigikontroll [email protected]
Allikas: Majandus- ja Kommunikatsiooniministeerium dokumendiregister →
dokumendiregister.eeAsutusedEesti avalike dokumendiregistrite otsing · nimistu.ee andmetel